Sample records for consecutive number schedule

  1. Roles of stimulus control and reinforcement frequency in modulating the behavioral effects of d-amphetamine in the rat

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rees, D.C.; Wood, R.W.; Laties, V.G.

    1984-03-01

    The behavioral effects of d-amphetamine have been shown to be modulated by stimulus control, with less impairment of performance occurring when control is great. When the fixed-consecutive-number schedule is used (on which at least a specified consecutive number of responses must be made on one operandum before a single response on another will produce a reinforcer), response rate tends to invariant but reinforcement frequency is not. This study asks whether the differences in reinforcement frequency that usually accompany changes in stimulus control could themselves be responsible for the performance differences. Two versions of the fixed-consecutive-number schedule of reinforcement were combinedmore » into a multiple schedule within which stimulus control was varied but differences in reinforcement frequency were minimized by omitting some reinforcer deliveries during the component that usually had the higher reinforcement frequency. In one component, a compound discriminative stimulus was added with the eighth consecutive response on the first lever, a single response on the second lever was then reinforced. In the other component, no such stimulus was presented. With no added stimulus, large decreases occurred in the number of runs satisfying the minimum requirement for reinforcement at doses of drug that produced only minimal changes when an added stimulus controlled behavior. Thus, increased stimulus control diminishes the behavioral changes produced by d-amphetamine even when the possible contribution by baseline reinforcement rate is minimized. 17 references, 6 figures, 4 tables.« less

  2. The Differentiation of Response Numerosities in the Pigeon

    ERIC Educational Resources Information Center

    Machado, Armando; Rodrigues, Paulo

    2007-01-01

    Two experiments examined how pigeons differentiate response patterns along the dimension of number. In Experiment 1, 5 pigeons received food after pecking the left key at least N times and then switching to the right key (Mechner's Fixed Consecutive Number schedule). Parameter N varied across conditions from 4 to 32. Results showed that run length…

  3. An effective repetitive training schedule to achieve skill proficiency using a novel robotic virtual reality simulator.

    PubMed

    Kang, Sung Gu; Ryu, Byung Ju; Yang, Kyung Sook; Ko, Young Hwii; Cho, Seok; Kang, Seok Ho; Patel, Vipul R; Cheon, Jun

    2015-01-01

    A robotic virtual reality simulator (Mimic dV-Trainer) can be a useful training method for the da Vinci surgical system. Herein, we investigate several repetitive training schedules and determine which is the most effective. A total of 30 medical students were enrolled and were divided into 3 groups according to the training schedule. Group 1 performed the task 1 hour daily for 4 consecutive days, group II performed the task on once per week for 1 hour for 4 consecutive weeks, and group III performed the task for 4 consecutive hours in 1 day. The effects of training were investigated by analyzing the number of repetitions and the time required to complete the "Tube 2" simulation task when the learning curve plateau was reached. The point at which participants reached a stable score was evaluated using the cumulative sum control graph. The average time to complete the task at the learning curve plateau was 150.3 seconds in group I, 171.9 seconds in group II, and 188.5 seconds in group III. The number of task repetitions required to reach the learning curve plateau was 45 repetitions in group I, 36 repetitions in group II, and 39 repetitions in group III. Therefore, there was continuous improvement in the time required to perform the task after 40 repetitions in group I only. There was a significant correlation between improvement in each trial interval and attempt, and the correlation coefficient (0.924) in group I was higher than that in group II (0.899) and group III (0.838). Daily 1-hour practice sessions performed for 4 consecutive days resulted in the best final score, continuous score improvement, and effective training while minimizing fatigue. This repetition schedule can be used for effectively training novices in future. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  4. The Differentiation of Response Numerosities in the Pigeon

    PubMed Central

    Machado, Armando; Rodrigues, Paulo

    2007-01-01

    Two experiments examined how pigeons differentiate response patterns along the dimension of number. In Experiment 1, 5 pigeons received food after pecking the left key at least N times and then switching to the right key (Mechner’s Fixed Consecutive Number schedule). Parameter N varied across conditions from 4 to 32. Results showed that run length on the left key followed a normal distribution whose mean and standard deviation increased linearly with N; the coefficient of variation approached a constant value (the scalar property). In Experiment 2, 4 pigeons received food with probability p for pecking the left key exactly four times and then switching. If that did not happen, the pigeons still could receive food by returning to the left key and pecking it for a total of at least 16 times and then switching. Parameter p varied across conditions from 1.0 to .25. Results showed that when p = 1.0 or p = .5, pigeons learned two response numerosities within the same condition. When p = .25, each pigeon adapted to the schedule differently. Two of them emitted first runs well described by a mixture of two normal distributions, one with mean close to 4 and the other with mean close to 16 pecks. A mathematical model for the differentiation of response numerosity in Fixed Consecutive Number schedules is proposed. PMID:17970413

  5. The impact of junior doctors' worktime arrangements on their fatigue and well-being.

    PubMed

    Tucker, Philip; Brown, Menna; Dahlgren, Anna; Davies, Gwyneth; Ebden, Philip; Folkard, Simon; Hutchings, Hayley; Akerstedt, Torbjörn

    2010-11-01

    Many doctors report working excessively demanding schedules that comply with the European Working Time Directive (EWTD). We compared groups of junior doctors working on different schedules in order to identify which features of schedule design most negatively affected their fatigue and well-being in recent weeks. Completed by 336 doctors, the questionnaires focused on the respondents' personal circumstances, work situation, work schedules, sleep, and perceptions of fatigue, work-life balance and psychological strain. Working 7 consecutive nights was associated with greater accumulated fatigue and greater work-life interference, compared with working just 3 or 4 nights. Having only 1 rest day after working nights was associated with increased fatigue. Working a weekend on-call between 2 consecutive working weeks was associated with increased work-life interference. Working frequent on-calls (either on weekends or during the week) was associated with increased work-life interference and psychological strain. Inter-shift intervals of <10 hours were associated with shorter periods of sleep and increased fatigue. The number of hours worked per week was positively associated with work-life interference and fatigue on night shifts. The current findings identify parameters, in addition to those specified in the EWTD, for designing schedules that limit their impact on doctors' fatigue and well-being.

  6. Fertility of the male alpaca: effect of daily consecutive breeding.

    PubMed

    Bravo, P W; Solis, P; Ordoñez, C; Alarcon, V

    1997-04-01

    The fertility of the male alpaca under different frequencies of daily consecutive matings was evaluated. Fifteen adult male Huacaya alpacas were divided randomly into three groups of five each to breed lactating female alpacas. The schedule of daily matings was two, four and six consecutive breeding per group and for nine consecutive days. Ovulation was determined by progesterone at seven days after breeding. Pregnancy was determined by ultrasonography at 15 and 30 days after breeding. Two hundred and eighty females were bred with some males not fulfilling their schedule of breeding. There were differences (P < 0.05) in the fertility rate of males breeding two and four times daily (76%) in contrast to 59% for males breeding six times. There were also differences (P < 0.05) in the fertility of individual males. Length of copulation was affected (P < 0.05) by schedule of matings, day of breeding and male. Ovulation was independent of length of copulation. Overall, it seems the fertility of the male alpaca is affected significantly when consecutive matings are over four times a day and for nine consecutive days.

  7. Traffic shaping and scheduling for OBS-based IP/WDM backbones

    NASA Astrophysics Data System (ADS)

    Elhaddad, Mahmoud S.; Melhem, Rami G.; Znati, Taieb; Basak, Debashis

    2003-10-01

    We introduce Proactive Reservation-based Switching (PRS) -- a switching architecture for IP/WDM networks based on Labeled Optical Burst Switching. PRS achieves packet delay and loss performance comparable to that of packet-switched networks, without requiring large buffering capacity, or burst scheduling across a large number of wavelengths at the core routers. PRS combines proactive channel reservation with periodic shaping of ingress-egress traffic aggregates to hide the offset latency and approximate the utilization/buffering characteristics of discrete-time queues with periodic arrival streams. A channel scheduling algorithm imposes constraints on burst departure times to ensure efficient utilization of wavelength channels and to maintain the distance between consecutive bursts through the network. Results obtained from simulation using TCP traffic over carefully designed topologies indicate that PRS consistently achieves channel utilization above 90% with modest buffering requirements.

  8. More reliable protein NMR peak assignment via improved 2-interval scheduling.

    PubMed

    Chen, Zhi-Zhong; Lin, Guohui; Rizzi, Romeo; Wen, Jianjun; Xu, Dong; Xu, Ying; Jiang, Tao

    2005-03-01

    Protein NMR peak assignment refers to the process of assigning a group of "spin systems" obtained experimentally to a protein sequence of amino acids. The automation of this process is still an unsolved and challenging problem in NMR protein structure determination. Recently, protein NMR peak assignment has been formulated as an interval scheduling problem (ISP), where a protein sequence P of amino acids is viewed as a discrete time interval I (the amino acids on P one-to-one correspond to the time units of I), each subset S of spin systems that are known to originate from consecutive amino acids from P is viewed as a "job" j(s), the preference of assigning S to a subsequence P of consecutive amino acids on P is viewed as the profit of executing job j(s) in the subinterval of I corresponding to P, and the goal is to maximize the total profit of executing the jobs (on a single machine) during I. The interval scheduling problem is max SNP-hard in general; but in the real practice of protein NMR peak assignment, each job j(s) usually requires at most 10 consecutive time units, and typically the jobs that require one or two consecutive time units are the most difficult to assign/schedule. In order to solve these most difficult assignments, we present an efficient 13/7-approximation algorithm for the special case of the interval scheduling problem where each job takes one or two consecutive time units. Combining this algorithm with a greedy filtering strategy for handling long jobs (i.e., jobs that need more than two consecutive time units), we obtain a new efficient heuristic for protein NMR peak assignment. Our experimental study shows that the new heuristic produces the best peak assignment in most of the cases, compared with the NMR peak assignment algorithms in the recent literature. The above algorithm is also the first approximation algorithm for a nontrivial case of the well-known interval scheduling problem that breaks the ratio 2 barrier.

  9. Creating an educationally minded schedule: one approach to minimize the impact of duty hour standards on intern continuity clinic experience.

    PubMed

    DeBlasio, Dominick; Kerrey, M Kathleen; Sucharew, Heidi; Klein, Melissa

    2014-11-01

    To determine if implementing an educationally minded schedule utilizing consecutive night shifts can moderate the impact of the 2011 duty hour standards on education and patient continuity of care in longitudinal primary care experience (continuity clinic). A 14-month pre-post study was performed in continuity clinic with one supervising physician group and two intern groups. Surveys to assess attitudes and education were distributed to the supervising physicians and interns before and after the changes in duty hour standards. Intern groups' schedules were reviewed for the number of regular and alternative day clinic (i.e. primary care experience on a different weekday) sessions and patient continuity of care. Fifteen supervising physicians and 51 interns participated (25 in 2011, 26 in 2012). Intern groups' comfort when discussing patient issues, educational needs and teamwork perception did not differ. Supervising physicians' understanding of learning needs and provision of feedback did not differ between groups. Supervising physicians indicated a greater ability to provide feedback and understand learning needs during regular continuity clinic sessions compared with alternative day clinics (all p < 0.05). No significant difference was detected between intern groups in the number of regularly scheduled continuity clinics, alternative day clinics or patient continuity of care. The 2011 duty hour standards required significant alterations to intern schedules, but educationally minded scheduling limited impact on education and patient continuity in care.

  10. Azacitidine in the 'real-world': an evaluation of 1101 higher-risk myelodysplastic syndrome/low blast count acute myeloid leukaemia patients in Ontario, Canada.

    PubMed

    Mozessohn, Lee; Cheung, Matthew C; Fallahpour, Saber; Gill, Tripat; Maloul, Asmaa; Zhang, Liying; Lau, Olivia; Buckstein, Rena

    2018-06-01

    The outcome of myelodysplastic syndrome (MDS) patients with uniformly higher-risk disease treated with azacitidine (AZA) in the 'real-world' remains largely unknown. We evaluated 1101 consecutive higher-risk MDS patients (International Prognostic Scoring System intermediate-2/high) and low-blast count acute myeloid leukaemia (AML; 21-30% blasts) patients treated in Ontario, Canada. By dosing schedule, 24·7% received AZA for seven consecutive days, 12·4% for six consecutive days and 62·9% by 5-2-2. Overall, median number of cycles was 6 (range 1-67) and 8 (range 6-14) when restricted to the 692 (63%) patients who received at least 4 cycles. The actuarial median survival was 11·6 months [95% confidence interval (CI) 10·7-12·4) for the entire cohort and 18·0 months (landmark analysis; 95% CI 16·6-19·1 months) for those receiving at least 4 cycles. There was no difference in overall survival (OS) between the 3 dosing schedules (P = 0·87). In our large 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML, we demonstrated a lower than expected OS. Reassuringly, survival did not differ by dosing schedules. The OS was higher in the 2/3 of patients who received at least 4 cycles of treatment, reinforcing the necessity of sustained administration until therapeutic benefits are realised. This represents the largest 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML. © 2018 John Wiley & Sons Ltd.

  11. Resistance to Extinction Following Variable-Interval Reinforcement: Reinforcer Rate and Amount

    ERIC Educational Resources Information Center

    Shull, Richard L.; Grimes, Julie A.

    2006-01-01

    Rats obtained food-pellet reinforcers by nose poking a lighted key. Experiment 1 examined resistance to extinction following single-schedule training with different variable-interval schedules, ranging from a mean interval of 16 min to 0.25 min. That is, for each schedule, the rats received 20 consecutive daily baseline sessions and then a session…

  12. An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time

    NASA Astrophysics Data System (ADS)

    Yusriski, R.; Sukoyo; Samadhi, T. M. A. A.; Halim, A. H.

    2016-02-01

    In the manufacturing industry, several identical parts can be processed in batches, and setup time is needed between two consecutive batches. Since the processing times of batches are not always fixed during a scheduling period due to learning and deterioration effects, this research deals with batch scheduling problems with simultaneous learning and deterioration effects. The objective is to minimize total actual flow time, defined as a time interval between the arrival of all parts at the shop and their common due date. The decision variables are the number of batches, integer batch sizes, and the sequence of the resulting batches. This research proposes a heuristic algorithm based on the Lagrange Relaxation. The effectiveness of the proposed algorithm is determined by comparing the resulting solutions of the algorithm to the respective optimal solution obtained from the enumeration method. Numerical experience results show that the average of difference among the solutions is 0.05%.

  13. Optimizing donor scheduling before recruitment: An effective approach to increasing apheresis platelet collections.

    PubMed

    Lokhandwala, Parvez M; Shike, Hiroko; Wang, Ming; Domen, Ronald E; George, Melissa R

    2018-01-01

    Typical approach for increasing apheresis platelet collections is to recruit new donors. Here, we investigated the effectiveness of an alternative strategy: optimizing donor scheduling, prior to recruitment, at a hospital-based blood donor center. Analysis of collections, during the 89 consecutive months since opening of donor center, was performed. Linear regression and segmented time-series analyses were performed to calculate growth rates of collections and to test for statistical differences, respectively. Pre-intervention donor scheduling capacity was 39/month. In the absence of active donor recruitment, during the first 29 months, the number of collections rose gradually to 24/month (growth-rate of 0.70/month). However, between month-30 and -55, collections exhibited a plateau at 25.6 ± 3.0 (growth-rate of -0.09/month) (p<0.0001). This plateau-phase coincided with donor schedule approaching saturation (65.6 ± 7.6% schedule booked). Scheduling capacity was increased by following two interventions: adding an apheresis instrument (month-56) and adding two more collection days/week (month-72). Consequently, the scheduling capacity increased to 130/month. Post-interventions, apheresis platelet collections between month-56 and -81 exhibited a spontaneous renewed growth at a rate of 0.62/month (p<0.0001), in absence of active donor recruitment. Active donor recruitment in month-82 and -86, when the donor schedule had been optimized to accommodate further growth, resulted in a dramatic but transient surge in collections. Apheresis platelet collections plateau at nearly 2/3rd of the scheduling capacity. Optimizing the scheduling capacity prior to active donor recruitment is an effective strategy to increase platelet collections at a hospital-based donor center.

  14. The accelerated hepatitis B virus vaccination schedule among hemodialysis patients, does it work? A randomized controlled trial.

    PubMed

    Imam, Mahmoud Hamada

    2017-12-01

    Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.

  15. Front-Loaded Versus Weekly Counseling for Treatment of Tobacco Addiction

    PubMed Central

    Kalman, David; Hoskinson, Randall A.; Kinnunen, Taru; Wadler, Brianna M.; Thomson, Carey C.; Rosner, Bernard

    2012-01-01

    Introduction: Approximately 60%–70% of cigarette smokers who try to quit relapse by 2 weeks postcessation. We tested the efficacy of a front-loaded (FL) counseling intervention whose goal was to increase the likelihood of successful early abstinence and subsequent long-term abstinence. Methods: We randomized 278 adult smokers to an FL or weekly behavioral smoking cessation counseling schedule. The total number of sessions across treatment was the same for both groups. However, those assigned to the FL schedule received 6 counseling sessions in the first 2 weeks postcessation, while those in the weekly condition received 2 sessions. Participants in both groups also received standard nicotine patch treatment. Results: At 1 year postcessation, FL participants were significantly less likely to have relapsed when continuous abstinence was used as the definition of abstinence/relapse (11.7% abstinent vs. 6.3%, hazard ratio [HR] = 0.69, p = .007); and there were nonsignificant trends for FL subjects to have better outcomes when abstinence was defined as never smoking for 7 or more consecutive days nor for 7 or more consecutive episodes (18.4% abstinent vs. 14.8%, HR = 0.83, p = .20) and as point prevalence abstinence (15.6% abstinent vs. 12.9%, p = .11). The relationship between FL counseling treatment and continuous abstinence was partially mediated by higher postcessation levels of social support perceived from counseling and greater use of cessation-related coping strategies. Conclusions: We conclude that FL counseling is a promising treatment model that should be evaluated further, perhaps using modifications of the FL schedule used in this study. PMID:22058190

  16. Phase I Study of RO4929097, a Gamma Secretase Inhibitor of Notch Signaling, in Patients With Refractory Metastatic or Locally Advanced Solid Tumors

    PubMed Central

    Tolcher, Anthony W.; Messersmith, Wells A.; Mikulski, Stanislaw M.; Papadopoulos, Kyriakos P.; Kwak, Eunice L.; Gibbon, Darlene G.; Patnaik, Amita; Falchook, Gerald S.; Dasari, Arvind; Shapiro, Geoffrey I.; Boylan, John F.; Xu, Zhi-Xin; Wang, Ka; Koehler, Astrid; Song, James; Middleton, Steven A.; Deutsch, Jonathan; DeMario, Mark; Kurzrock, Razelle; Wheler, Jennifer J.

    2012-01-01

    Purpose To determine the maximum-tolerated dose (MTD) and assess safety, pharmacokinetics, pharmacodynamics, and evidence of antitumor activity of RO4929097, a gamma secretase inhibitor of Notch signaling in patients with advanced solid malignancies. Patients and Methods Patients received escalating doses of RO4929097 orally on two schedules: (A) 3 consecutive days per week for 2 weeks every 3 weeks; (B) 7 consecutive days every 3 weeks. To assess reversible CYP3A4 autoinduction, the expanded part of the study tested three dosing schedules: (B) as above; modified A, 3 consecutive d/wk for 3 weeks; and (C) continuous daily dosing. Positron emission tomography scans with [18F]fluorodeoxyglucose (FDG-PET) were used to assess tumor metabolic effects. Results Patients on schedule A (n = 58), B (n = 47), and C (n = 5; expanded cohort) received 302 cycles of RO4929097. Common grade 1 to 2 toxicities were fatigue, thrombocytopenia, fever, rash, chills, and anorexia. Transient grade 3 hypophosphatemia (dose-limiting toxicity, one patient) and grade 3 pruritus (two patients) were observed at 27 mg and 60 mg, respectively; transient grade 3 asthenia was observed on schedule A at 80 mg (one patient). Tumor responses included one partial response in a patient with colorectal adenocarcinoma with neuroendocrine features, one mixed response (stable disease) in a patient with sarcoma, and one nearly complete FDG-PET response in a patient with melanoma. Effect on CYP3A4 induction was observed. Conclusion RO4929097 was well tolerated at 270 mg on schedule A and at 135 mg on schedule B; the safety of schedule C has not been fully evaluated. Further studies are warranted on the basis of a favorable safety profile and preliminary evidence of clinical antitumor activity. PMID:22529266

  17. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    PubMed

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid residency programs in schedule analysis and redesign.

  18. Developing optimal nurses work schedule using integer programming

    NASA Astrophysics Data System (ADS)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  19. 29 CFR 2520.104-50 - Short plan years, deferral of accountant's examination and report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Financial statements and accompanying schedules prepared in conformity with the requirements of section 103... respect to the financial statements and accompanying schedules for both of the two plan years. (2) The annual report for the second of the two consecutive plan years shall include: (i) Financial statements...

  20. 19 CFR 162.45 - Summary forfeiture: Property other than Schedule I and Schedule II controlled substances. Notice...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... navigation laws belongs or is consigned, if that information is known to the Fines, Penalties, and... Web site for at least 30 consecutive days. Information pertaining to the Government forfeiture Web..., additional publication for at least three successive weeks in a print medium may be provided. All known...

  1. 19 CFR 162.45 - Summary forfeiture: Property other than Schedule I and Schedule II controlled substances. Notice...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... navigation laws belongs or is consigned, if that information is known to the Fines, Penalties, and... Web site for at least 30 consecutive days. Information pertaining to the Government forfeiture Web..., additional publication for at least three successive weeks in a print medium may be provided. All known...

  2. One-Course-at-a-Time "Block Plan" Re-examined by College That Adopted It 25 Years Ago.

    ERIC Educational Resources Information Center

    Gose, Ben

    1995-01-01

    Colorado College is reconsidering its block scheduling, in which students take eight immersion courses consecutively within the academic year, rather than taking several courses concurrently. Advantages of block scheduling include more intensive instruction and increased student focus on subject matter. Some students and faculty are concerned that…

  3. Updating the "Risk Index": A systematic review and meta-analysis of occupational injuries and work schedule characteristics.

    PubMed

    Fischer, Dorothee; Lombardi, David A; Folkard, Simon; Willetts, Joanna; Christiani, David C

    2017-01-01

    Fatigue is a major risk factor for occupational 'accidents' and injuries, and involves dimensions of physical, mental, and muscular fatigue. These dimensions are largely influenced by temporal aspects of work schedules. The "Risk Index" combines four fatigue-related components of work schedules to estimate occupational 'accident' and injury risk based on empirical trends: shift type (morning, afternoon/evening, night), length and consecutive number, and on-shift rest breaks. Since its first introduction in 2004, several additional studies have been published that allow the opportunity to improve the internal and external validity of the "Risk Index". Thus, we updated the model's estimates by systematically reviewing the literature and synthesizing study results using meta-analysis. Cochrane Collaboration directives and MOOSE guidelines were followed. We conducted systematic literature searches on each model component in Medline. An inverse variance approach to meta-analysis was used to synthesize study effect sizes and estimate between-studies variance ('heterogeneity'). Meta-regression models were conducted to explain the heterogeneity using several effect modifiers, including the sample age and sex ratio. Among 3,183 initially identified abstracts, after screening by two independent raters (95-98% agreement), 29 high-quality studies were included in the meta-analysis. The following trends were observed: Shift type. Compared to morning shifts, injury risk significantly increased on night shifts (RR = 1.36 [95%CI = 1.15-1.60], n = 14 studies), while risk was slightly elevated on afternoon/evening shifts, although non-significantly (RR = 1.12 [0.76-1.64], n = 9 studies). Meta-regressions revealed worker's age as a significant effect modifier: adolescent workers (≤ 20 y) showed a decreased risk on the afternoon/evening shift compared to both morning shifts and adult workers (p < 0.05). Number of consecutive shifts. Compared to the first shift in a block of consecutive shifts, risk increased exponentially for morning shifts (e.g., 4th: RR = 1.09 [0.90-1.32]; n = 6 studies) and night shifts (e.g., 4th: RR = 1.36 [1.14-1.62]; n = 8 studies), while risk on afternoon/evening shifts appeared unsystematic. Shift length. Injury risk rose substantially beyond the 9th hour on duty, a trend that was mirrored when looking at shift lengths (e.g., >12 h: RR = 1.34 [1.04-1.51], n = 3 studies). Rest breaks. Risk decreased for any rest break duration (e.g., 31-60 min: RR = 0.35 [0.29-0.43], n = 2 studies). With regards to time between breaks, risk increased with every additional half hour spent on the work task compared to the first 30 min (e.g., 90-119 min: RR = 1.62 [1.00-2.62], n = 3 studies). Rest break duration and interval seem to interact such that with increasing duration, the time between breaks becomes irrelevant. The updated "Risk Index". All four components were combined to form the updated model and the relative risk values estimated for a variety of work schedules. The resulting "Risk Map" shows regions of highest risk when rest breaks are not taken frequently enough (i.e. <4 h) or are too short (i.e. <30 min), when shift length exceeds 11 h, and when work takes place during the night (particularly for >3 consecutive night shifts). The "Risk Index" is proposed as an empirical model to predict occupational 'accident' and injury risk based on the most recent data in the field, and can serve as a tool to evaluate hazards and maximize safety across different work schedules.

  4. Role of discriminative stimuli in modulating drug action. [Pigeons

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laties, V.G.

    1975-08-01

    Behavior reinforced in the presence of a stimulus comes under the control of the stimulus. A drug can then modify that control and, therefore, modify the behavior itself. Studies over the past 2 decades have shown that the nature of the controlling (or discriminative) stimulus can govern the degree to which drugs change performance. These experiments usually have compared behavior on various schedules of reinforcement with and withoout added discriminative stimuli. For instance, pigeons that had been trained on a fixed-interval schedule showed great changes in response distribution after amphetamine and scopolamine. The same birds, when performing on a fixed-intervalmore » schedule to which time-correlated discriminative stimuli had been added, showed smaller changes in response distribution. Other pigeons were trained to make a minimum number of consecutive responses on one key before a peck on a second key would be reinforced; d-amphetamine and scopolamine led to pronounced increases in premature switching. Adding a discriminative stimulus when the response requirement was fulfilled increased the likelihood that a switch would occur only after the appropriate number of pecks had been emitted. It also attenuated the effects of the drugs. The presence of discriminative stimuli did not make as large a difference in performance in either of these experiments when chlorpromazine and promazine were studied. In general, work with other schedules of reinforcement supports the conclusion that behavior under strong external stimulus controls is less apt to be readily affected by many drugs. Addition of the discriminative stimulus can also ''improve'' the behavior of pigeons that have been given enouth methylmercury to increase greatly the variability of their performance. (auth)« less

  5. Working with a fixed operating room team on consecutive similar cases and the effect on case duration and turnover time.

    PubMed

    Stepaniak, Pieter S; Vrijland, Wietske W; de Quelerij, Marcel; de Vries, Guus; Heij, Christiaan

    2010-12-01

    If variation in procedure times could be controlled or better predicted, the cost of surgeries could be reduced through improved scheduling of surgical resources. This study on the impact of similar consecutive cases on the turnover, surgical, and procedure times tests the perception that repeating the same manual tasks reduces the duration of these tasks. We hypothesize that when a fixed team works on similar consecutive cases the result will be shorter turnover and procedure duration as well as less variation as compared with the situation without a fixed team. Case-control study. St Franciscus Hospital, a large general teaching hospital in Rotterdam, the Netherlands. Two procedures, inguinal hernia repair and laparoscopic cholecystectomy, were selected and divided across a control group and a study group. Patients were randomly assigned to the study or control group. Preparation time, surgical time, procedure time, and turnover time. For inguinal hernia repair, we found a significantly lower preparation time and 10 minutes less procedure time in the study group, as compared with the control group. Variation in the study group was lower, as compared with the control group. For laparoscopic cholecystectomy, preparation time was significantly lower in the study group, as compared with the control group. For both procedures, there was a significant decrease in turnover time. Scheduling similar consecutive cases and performing with a fixed team results in lower turnover times and preparation times. The procedure time of the inguinal hernia repair decreased significantly and has practical scheduling implications. For more complex surgery, like laparoscopic cholecystectomy, there is no effect on procedure time.

  6. The Effects of Spacing, Naps, and Fatigue on the Acquisition and Retention of Laparoscopic Skills.

    PubMed

    Spruit, Edward N; Band, Guido P H; van der Heijden, Kristiaan B; Hamming, Jaap F

    Earlier research has shown that laparoscopic skills are trained more efficiently on a spaced schedule compared to a massed schedule. The aim of the study was to estimate to what extent the spacing interval, naps, and fatigue influenced the effectiveness of spacing laparoscopy training. Overall 4 groups of trainees (aged 17-41y; 72% female; N massed = 40; N break = 35; N break-nap = 37; N spaced = 37) without prior experience were trained in 3 laparoscopic tasks using a physical box trainer with different scheduling interventions. The first (massed) group received three 100-minute training sessions consecutively on a single day. The second (break) group received the sessions interrupted with two 45-minute breaks. The third (break-nap) group had the same schedule as the second group, but had two 35-minute powernap intervals during the breaks. The fourth (spaced) group had the 3 sessions on 3 consecutive days. A retention session was organized approximately 3 months after training. The results showed an overall pattern of superior performance at the end of training and at retention for the spaced group, followed by the break-nap, break, and massed group, respectively. The spaced and break-nap group significantly outperformed the break and massed group, with effect sizes ranging from 0.20 to 0.37. Spacing laparoscopic training over 3 consecutive days or weeks is superior to massed training, even if the massed training contains breaks. Breaks with sleep opportunity (i.e., lying, inactive, and muted sensory input) enhance performance over training with regular breaks and traditional massed training. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  7. Neuropathy and efficacy of once weekly subcutaneous bortezomib in multiple myeloma and light chain (AL) amyloidosis

    PubMed Central

    Sidana, Surbhi; Narkhede, Mayur; Elson, Paul; Hastings, Debbie; Faiman, Beth; Valent, Jason; Samaras, Christy; Hamilton, Kimberly; Liu, Hien K.; Smith, Mitchell R.; Reu, Frederic J.

    2017-01-01

    Introduction Randomized studies have shown that bortezomib (BTZ) can be given weekly via intravenous (IV) route or twice weekly via subcutaneous (SC) route with lower neuropathy risk and no loss of anti-myeloma efficacy compared to original standard IV twice weekly schedule. Weekly SC should therefore yield the best therapeutic index and is widely used but has not been compared to established administration schedules in the context of a clinical trial. Methods Comprehensive electronic medical record review was done for disease control and neuropathy symptoms of 344 consecutive patients who received their first BTZ-containing regimen for myeloma or AL amyloidosis before or after we changed to SC weekly in December 2010. Univariate and multivariable analyses were carried out that adjusted for age, underlying disease, concurrently used anticancer agents, underlying conditions predisposing to neuropathy, and number of prior regimens compared SC weekly to other schedules. Results Fifty-three patients received BTZ SC weekly, 17 SC twice weekly, 127 IV weekly and 147 IV twice weekly. Risk for neuropathy of any grade was higher with other schedules compared to SC weekly (44.3% vs. 26.9%, p = 0.001) while response rate was similar (72.1% vs. 76.6%, respectively, p = 0.15). Multivariable analyses upheld higher neuropathy risk (Odds ratio 2.45, 95% CI 1.26–4.76, p = 0.008) while the likelihood of not achieving a response (= partial response or better) was comparable (Odds ratio 1.25, 95% CI 0.58–2.71, p = 0.56) for other schedules compared to SC weekly, respectively. Lower neuropathy risk translated into longer treatment duration when BTZ was started SC weekly (p = 0.001). Conclusions Weekly SC BTZ has activity comparable to other schedules and causes low rates of neuropathy. PMID:28278302

  8. A combined field and laboratory design for assessing the impact of night shift work on police officer operational performance.

    PubMed

    Waggoner, Lauren B; Grant, Devon A; Van Dongen, Hans P A; Belenky, Gregory; Vila, Bryan

    2012-11-01

    This study assessed the utility of a combined field and laboratory research design for measuring the impact of consecutive night shift work on the sleepiness, vigilance, and driving performance of police patrol officers. For police patrol officers working their normal night shift duty cycles, simulated driving performance and psychomotor vigilance were measured in a laboratory on two separate occasions: in the morning after the last of five consecutive 10.7-h night shifts, and at the same time in the morning after three consecutive days off duty. Order of participation in conditions was randomized among subjects. Subjects experienced manipulation of sleep schedules due to working night shifts in a real operational environment, but performance testing was conducted under controlled laboratory conditions. N = 29 active-duty police patrol officers (27 male, 2 female; age 37.1 ± 6.3 years) working night shift schedules participated in this study. Simulated driving performance, psychomotor vigilance, and subjective sleepiness were significantly degraded following 5 consecutive night shifts as compared to 3 consecutive days off duty, indicating that active-duty police officers are susceptible to performance degradation as a consequence of working nights. This combined field and laboratory research design succeeded in bridging the gap between the realism of the operational environment and the control of laboratory performance testing, demonstrating that this is a useful approach for addressing the relationship between shift work induced fatigue and critical operational task performance.

  9. NEUROTIC DISORDERS IN CHILDREN: A PSYCHO-SOCIAL STUDY

    PubMed Central

    Sharma, S. N; Bhat, V. K; Sengupta, J.

    1980-01-01

    SUMMARY Thirty neurotic children and their parents seen consecutively at the C.G.C., Institute of Medical Sciences, Varanasi, were studied with the help of a structured interview schedule and were subjected to detailed psychiatric assessment. The results were compared with that of thirty normal children and their parents who were studied in a like manner. Hysteria was found to be the commonest type of neurosis seen in C.G.C. population, followed by anxiety neurosis. In a number of cases there was a close similarity between symptoms presented by the children and the symptoms of parents who were suffering from neurotic or physical illness at the same time. The relevance of these findings are discussed. PMID:22058499

  10. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems.

    PubMed

    van de Ven, Hardy A; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-09-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are associated with better sleep, need for recovery, health and performance. Questionnaire data were collected from 491 shift workers of 18 companies with 9 regular (semi)-continuous shift schedules. The shift schedule characteristics were analyzed separately and combined using multilevel linear regression models. The hypothesis was largely not confirmed. Relatively few associations were found, of which the majority was in the direction as expected. In particular early starts of morning shifts and many consecutive shifts seem to be avoided. The healthy worker effect, limited variation between included schedules and the cross-sectional design might explain the paucity of significant results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. THE EFFECTS OF FIXED VERSUS ESCALATING REINFORCEMENT SCHEDULES ON SMOKING ABSTINENCE

    PubMed Central

    Romanowich, Paul; Lamb, R. J.

    2015-01-01

    Studies indicate that when abstinence is initiated, escalating reinforcement schedules maintain continuous abstinence longer than fixed reinforcement schedules. However, these studies were conducted for shorter durations than most clinical trials and also resulted in larger reinforcer value for escalating participants during the 1st week of the experiment. We tested whether escalating reinforcement schedules maintained abstinence longer than fixed reinforcement schedules in a 12-week clinical trial. Smokers (146) were randomized to an escalating reinforcement schedule, a fixed reinforcement schedule, or a control condition. Escalating reinforcement participants received $5.00 for their first breath carbon monoxide (CO) sample <3 ppm, with a $0.50 increase for each consecutive sample. Fixed reinforcement participants received $19.75 for each breath CO sample <3 ppm. Control participants received payments only for delivering a breath CO sample. Similar proportions of escalating and fixed reinforcement participants met the breath CO criterion at least once. Escalating reinforcement participants maintained criterion breath CO levels longer than fixed reinforcement and control participants. Similar to previous short-term studies, escalating reinforcement schedules maintained longer durations of abstinence than fixed reinforcement schedules during a clinical trial. PMID:25640764

  12. 5 CFR 551.501 - Overtime pay.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... in 5 U.S.C. 6121, for employees under flexible or compressed work schedules; (7) For hours of work... period of 168 hours—seven consecutive 24-hour periods. It need not coincide with the calendar week but...

  13. A synergetic combination of small and large neighborhood schemes in developing an effective procedure for solving the job shop scheduling problem.

    PubMed

    Amirghasemi, Mehrdad; Zamani, Reza

    2014-01-01

    This paper presents an effective procedure for solving the job shop problem. Synergistically combining small and large neighborhood schemes, the procedure consists of four components, namely (i) a construction method for generating semi-active schedules by a forward-backward mechanism, (ii) a local search for manipulating a small neighborhood structure guided by a tabu list, (iii) a feedback-based mechanism for perturbing the solutions generated, and (iv) a very large-neighborhood local search guided by a forward-backward shifting bottleneck method. The combination of shifting bottleneck mechanism and tabu list is used as a means of the manipulation of neighborhood structures, and the perturbation mechanism employed diversifies the search. A feedback mechanism, called repeat-check, detects consequent repeats and ignites a perturbation when the total number of consecutive repeats for two identical makespan values reaches a given threshold. The results of extensive computational experiments on the benchmark instances indicate that the combination of these four components is synergetic, in the sense that they collectively make the procedure fast and robust.

  14. The association between rotating shift work and increased occupational stress in nurses.

    PubMed

    Lin, Pei-Chen; Chen, Chung-Hey; Pan, Shung-Mei; Chen, Yao-Mei; Pan, Chih-Hong; Hung, Hsin-Chia; Wu, Ming-Tsang

    2015-01-01

    The aim of this study was to investigate whether rotating shift work increases occupational stress in nurses. This study measured shift work scheduling and occupational stress by using the Effort-Reward Imbalance model with self-reported questionnaires in a sample of 654 female nurses. Overcommitment risk was higher in nurses who worked rotating shifts than in those who worked day/non-night shifts (OR, 2.16; 95% CI, 1.03-4.66). However, an effort/reward imbalance was not directly associated with work schedules (OR, 1.88; 95% CI, 0.87-4.35). Among nurses working rotation rotating shifts, those who had 2 days off after their most recent night shifts showed an alleviated risk of overcommitment (OR, 0.52; 95% CI, 0.32-0.82), but those who had worked for at least one series of 7 consecutive work days per month had an increased risk of effort/reward imbalance (OR, 2.75; 95% CI, 1.69-4.48). Additionally, those who had little or no participation in planning working hours and shift scheduling and worked overtime at least three times per week during the preceding 2 months tended to have high stress. The nurses who worked rotating shifts tended to experience work-related stress, but their stress levels improved if they had at least 2 days off after their most recent night shift and if they were not scheduled to work 7 consecutive days. These empirical data can be used to optimize work schedules for nurses to alleviate work stress.

  15. Recruitment techniques for alcohol pharmacotherapy clinical trials: A cost-benefit analysis.

    PubMed

    Tompkins, D Andrew; Sides, Jessica A; Harrison, Joseph A; Strain, Eric C

    2015-12-01

    Alcohol use disorders (AUDs) represent a large public health burden with relatively few efficacious pharmacotherapies. Randomized controlled trials (RCTs) for new AUD therapies can be hampered by ineffective recruitment, leading to increased trial costs. The current analyses examined the effectiveness of recruitment efforts during two consecutive outpatient RCTs of novel AUD pharmacotherapies conducted between 2009 and 2012. During an initial phone screen, participants identified an ad source for learning about the study. Qualified persons were then scheduled for in-person screens. The present analyses examined demographic differences amongst the eight ad sources utilized. Recruitment effectiveness was determined by dividing the number of persons meeting criteria for an in-person screen by the total number of callers from each ad source. Cost-effectiveness was determined by dividing total ad source cost by number of screens, participants randomized, and completers. 1,813 calls resulted in 1,005 completed phone screens. The most common ad source was TV (34%), followed by print (29%), word-of-mouth (11%), flyer (8%), internet (5%), radio (5%), bus ad (2%), and billboard (1%). Participants reporting bus ads (46%), billboard (44%), or print ads (34%) were significantly more likely than the other sources to meet criteria to be scheduled for in-person screens. The most cost-effective ad source was print ($2,506 per completer), while bus ad was the least cost-effective ($13,376 per completer). Recruitment in AUD RCTs can be successful using diverse advertising methods. The present analyses favored use of print ads as most cost-effective.

  16. Cumulative exposure to shift work and sickness absence: associations in a five-year historic cohort.

    PubMed

    van Drongelen, Alwin; Boot, Cécile R L; Hlobil, Hynek; van der Beek, Allard J; Smid, Tjabe

    2017-01-11

    Exposure to shift work has been associated with negative health consequences, although the association between shift work and sickness absence remains unclear. The aim of this study is to investigate associations between cumulative exposure to shift work and sickness absence among ground staff employees of an airline company. This study used data from the MORE (Monitoring Occupational Health Risks in Employees) cohort, which is a 5-year historic cohort. The population of the present study consisted of 7562 ground staff employees. For each employee, work schedules and sickness absence days between 2005 and 2009 were obtained from company records. For the exposure to different shift schedule types and to the cumulative number of night shifts, the association with long-term sickness absence (>7 consecutive sickness absence days) and the number of sickness absence episodes during 2009, was calculated using logistic and Poisson regression analyses. Socio-demographic variables, work-related variables, job classification variables, and previous sickness absence days were regarded as confounders. After adjusting for previous sickness absence and job classification variables, only the group of employees that switched into working in a three-shift schedule, showed a significantly increased risk for long-term sickness absence (OR = 1.31, 95%CI 1.02-1.69). Night shift exposure was not significantly associated with long-term sickness absence. Exposure to shift work was negatively associated with more sickness absence episodes. Employees who were exposed to more than 46 night shifts also showed a lower risk for more sickness absence episodes. Subgroup analyses showed that single employees and employees without children had an increased risk for long-term sickness absence when exposed to a three-shift schedule, and when they had changed between shift schedule types. Cumulative exposure to shift work proved to be negatively associated with more sickness absence episodes, and was not associated with more long-term sickness absence, although selection bias could not be ruled out. Future research should explore the influence of household composition, and take into account both previous sickness absence and psychosocial and physical work factors to obtain a better estimation of the association between shift work and sickness absence.

  17. Injuries to young professional baseball pitchers cannot be prevented solely by restricting number of innings pitched.

    PubMed

    Karakolis, Thomas; Bhan, Shivam; Crotin, Ryan L

    2016-05-01

    The Major League Baseball schedule is longer and more intensive than minor and amateur leagues. As a result, major league pitchers endure a considerably higher cumulative workload throughout the season. Ligament, tendon, muscle, and bone tissues in young pitchers need time to adapt to the workload a major league pitcher must endure. To mitigate the risk of overuse injury, and allow time for tissue adaptation to occur, most teams limit the number of innings a young pitcher may throw. This study examined the relationship between innings pitched and future injury in young professional baseball pitchers. All pitchers under 25 years of age that pitched at least one third of an inning in Major League Baseball during the 2002-2007 seasons were included in this study. Total innings pitched were accumulated for each season across three levels of professional baseball (Major League Baseball, and two levels of Minor Leagues). Regression analyses were preformed comparing innings pitched during a single season and difference in innings pitched over consecutive seasons to future injury, as measured by time spent on the disabled list. No significant correlation was found between innings pitched and future injury or consecutive season innings pitched difference and future injury. No significant differences were found when pitchers were split into groups based upon consecutive season innings pitched difference cutoffs. Based upon the evidence presented, strength and conditioning coaches, sports medicine specialists, and team trainers cannot rely solely on inning counts to accurately measure the tissue demands of professional baseball pitching. Therefore, inning limits alone cannot be used to protect young professional pitchers against the threat of injury.

  18. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    PubMed Central

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-01-01

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology. PMID:29659508

  19. How do employees prioritise when they schedule their own shifts?

    PubMed

    Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene

    2013-01-01

    We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.

  20. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    PubMed

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  1. Physicians, nonphysician healthcare providers, and patients communicating in hepatitis C: an in-office sociolinguistic study.

    PubMed

    Hamilton, Heidi E; Gordon, Cynthia; Nelson, Meaghan; Kerbleski, Marian

    2006-01-01

    In-office conversations about hepatitis C can impact patients' perceptions of outcomes, as well as medication adherence. This study analyzed interactions between physicians, nonphysician healthcare providers (including nurses), and patients with hepatitis C virus infection in order to examine differences based on number and type of providers participating. Gastroenterologists, nonphysician healthcare providers, and patients with hepatitis C virus infection were video- and audio-recorded during regularly scheduled visits. Recordings were transcribed and analyzed using validated sociolinguistic techniques. Thirty-four visits took place with a physician only, 4 with a nonphysician healthcare provider only, and 25 with both providers (9 concurrent and 16 consecutive). Differences among the participant schema included visit length, patient "talk-time," and motivation provided. When providers saw patients consecutively, differing information was sometimes provided. In visits where providers saw the patient concurrently, competing authority between providers and exclusion of the patient through use of medical jargon were obstacles to ideal communication. Differences in hepatitis C-related interactions based on the number and type of participants suggest opportunities for improved communication. In visits with multiple providers, physicians and nurses should attempt to ensure that they (a) avoid supplying differing information, (b) present a "unified front" to avoid competing authority, and (c) minimize the use of medical jargon, which excludes patients from participating in their own healthcare.

  2. Impacts of shift work on sleep and circadian rhythms.

    PubMed

    Boivin, D B; Boudreau, P

    2014-10-01

    Shift work comprises work schedules that extend beyond the typical "nine-to-five" workday, wherein schedules often comprise early work start, compressed work weeks with 12-hour shifts, and night work. According to recent American and European surveys, between 15 and 30% of adult workers are engaged in some type of shift work, with 19% of the European population reportedly working at least 2 hours between 22:00 and 05:00. The 2005 International Classification of Sleep Disorders estimates that a shift work sleep disorder can be found in 2-5% of workers. This disorder is characterized by excessive sleepiness and/or sleep disruption for at least one month in relation with the atypical work schedule. Individual tolerance to shift work remains a complex problem that is affected by the number of consecutive work hours and shifts, the rest periods, and the predictability of work schedules. Sleepiness usually occurs during night shifts and is maximal at the end of the night. Impaired vigilance and performance occur around times of increased sleepiness and can seriously compromise workers' health and safety. Indeed, workers suffering from a shift work sleep-wake disorder can fall asleep involuntarily at work or while driving back home after a night shift. Working on atypical shifts has important socioeconomic impacts as it leads to an increased risk of accidents, workers' impairment and danger to public safety, especially at night. The aim of the present review is to review the circadian and sleep-wake disturbances associated with shift work as well as their medical impacts. Copyright © 2014. Published by Elsevier SAS.

  3. Very Long (> 48 hours) Shifts and Cardiovascular Strain in Firefighters: a Theoretical Framework

    PubMed Central

    2014-01-01

    Shift work and overtime have been implicated as important work-related risk factors for cardiovascular disease (CVD). Many firefighters who contractually work on a 24-hr work schedule, often do overtime (additional 24-hr shifts) which can result in working multiple, consecutive 24-hr shifts. Very little research has been conducted on firefighters at work that examines the impact of performing consecutive 24-hr shifts on cardiovascular physiology. Also, there have been no standard field methods for assessing in firefighters the cardiovascular changes that result from 24-hr shifts, what we call “cardiovascular strain”. The objective of this study, as the first step toward elucidating the role of very long (> 48 hrs) shifts in the development of CVD in firefighters, is to develop and describe a theoretical framework for studying cardiovascular strain in firefighters on very long shifts (i.e., > 2 consecutive 24-hr shifts). The developed theoretical framework was built on an extensive literature review, our recently completed studies with firefighters in Southern California, e-mail and discussions with several firefighters on their experiences of consecutive shifts, and our recently conducted feasibility study in a small group of firefighters of several ambulatory cardiovascular strain biomarkers (heart rate, heart rate variability, blood pressure, salivary cortisol, and salivary C-reactive protein). The theoretical framework developed in this study will facilitate future field studies on consecutive 24-hr shifts and cardiovascular health in firefighters. Also it will increase our understanding of the mechanisms by which shift work or long work hours can affect CVD, particularly through CVD biological risk factors, and thereby inform policy about sustainable work and rest schedules for firefighters. PMID:24602344

  4. Very Long (> 48 hours) Shifts and Cardiovascular Strain in Firefighters: a Theoretical Framework.

    PubMed

    Choi, Bongkyoo; Schnall, Peter L; Dobson, Marnie; Garcia-Rivas, Javier; Kim, Hyoungryoul; Zaldivar, Frank; Israel, Leslie; Baker, Dean

    2014-03-06

    Shift work and overtime have been implicated as important work-related risk factors for cardiovascular disease (CVD). Many firefighters who contractually work on a 24-hr work schedule, often do overtime (additional 24-hr shifts) which can result in working multiple, consecutive 24-hr shifts. Very little research has been conducted on firefighters at work that examines the impact of performing consecutive 24-hr shifts on cardiovascular physiology. Also, there have been no standard field methods for assessing in firefighters the cardiovascular changes that result from 24-hr shifts, what we call "cardiovascular strain". The objective of this study, as the first step toward elucidating the role of very long (> 48 hrs) shifts in the development of CVD in firefighters, is to develop and describe a theoretical framework for studying cardiovascular strain in firefighters on very long shifts (i.e., > 2 consecutive 24-hr shifts). The developed theoretical framework was built on an extensive literature review, our recently completed studies with firefighters in Southern California, e-mail and discussions with several firefighters on their experiences of consecutive shifts, and our recently conducted feasibility study in a small group of firefighters of several ambulatory cardiovascular strain biomarkers (heart rate, heart rate variability, blood pressure, salivary cortisol, and salivary C-reactive protein). The theoretical framework developed in this study will facilitate future field studies on consecutive 24-hr shifts and cardiovascular health in firefighters. Also it will increase our understanding of the mechanisms by which shift work or long work hours can affect CVD, particularly through CVD biological risk factors, and thereby inform policy about sustainable work and rest schedules for firefighters.

  5. Incidence and root causes of delays in emergency orthopaedic procedures: a single-centre experience of 36,017 consecutive cases over seven years.

    PubMed

    Caesar, Ulla; Karlsson, Jon; Hansson, Elisabeth

    2018-01-01

    Emergency surgery is unplanned by definition and patients are scheduled for surgery with minimal preparation. Some patients who have sustained emergency orthopaedic trauma or other conditions must be operated on immediately or within a few hours, while others can wait until the hospital's resources permit and/or the patients' health status has been optimised as needed. This may affect the prioritisation procedures for both emergency and elective surgery and might result in waiting lists, not only for planned procedures but also for emergencies. The main purpose of this retrospective, observational, single-centre study was to evaluate and describe for the number and reasons of delays, as well as waiting times in emergency orthopaedic surgery using data derived from the hospital's records and registers. All the emergency patients scheduled for emergency surgery whose procedures were rescheduled and delayed between 1 January 2007 and 31 December 2013 were studied. We found that 24% (8474) of the 36,017 patients scheduled for emergency surgeries were delayed and rescheduled at least once, some several times. Eighty per cent of these delays were due to organisational causes. Twenty-one per cent of all the delayed patients had surgery within 24 h, whilst 41% waited for more than 24 h, up to 3 days. A large number of the clinic's emergency orthopaedic procedures were rescheduled and delayed and the majority of the delays were related to organisational reasons. The results can be interpreted in two ways; first, organisational reasons are avoidable and the potential for improvement is great and, secondly and most importantly, the delays might negatively affect patient outcomes.

  6. 5 CFR 532.501 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of seven consecutive calendar days. Basic workweek for full time employees means the days and hours... scheduled administrative workweek. Night shift differential means the differential paid the employee when... day or in excess of 40 hours in an administrative workweek, and includes irregular or occasional...

  7. Toward a new paradigm in graduate medical education in the United States: elimination of the 24-hour call.

    PubMed

    Mautone, Susan G

    2009-12-01

    Sleep deprivation negatively affects resident performance, education, and safety. Concerns over these effects have prompted efforts to reduce resident hours. This article describes the design and implementation of a scheduling system with no continuous 24-hour calls. Aims included meeting Accreditation Council for Graduate Medical Education work hour requirements without increasing resident complement, maximizing continuity of learning and patient care, maintaining patient care quality, and acceptance by residents, faculty, and administration. Various coverage options were formulated and discussed. The final schedule was the product of consensus. After re-engineering the master rotation schedule, service-specific conversion of on-call schedules was initiated in July 2003 and completed in July 2004. Annual in-training and certifying examination performance, length of stay, patient mortalities, resident motor vehicle accidents/near misses, and resident satisfaction with the new scheduling system were tracked. Continuous 24-hour call has been eliminated from the program since July 2004, with the longest assigned shift being 14 hours. Residents have at least 1 free weekend per month, a 10-hour break between consecutive assigned duty hours, and a mandatory 4-hour "nap" break if assigned a night shift immediately following a day shift. Program-wide, duty hours average 66 hours per week for first-year residents, 63 hours per week for second-year residents, and 60 hours per week for third-year residents. Self-reported motor vehicle accidents and/or near misses of accidents significantly decreased (P < .001) and resident satisfaction increased (P  =  .42). The change was accomplished at no additional cost to the institution and with no adverse patient care or educational outcomes. Pediatric residency training with restriction to 14 consecutive duty hours is effective and well accepted by stakeholders. Five years later, the re-engineered schedule has become the new "normal" for our program.

  8. Effects of modifications to the health and social sector's collective agreement on the objective characteristics of working hours.

    PubMed

    Ropponen, Annina; Vanttola, Päivi; Koskinen, Aki; Hakola, Tarja; Puttonen, Sampsa; Härmä, Mikko

    2017-08-08

    This study aimed to evaluate the effects of an intervention on objective working-hour characteristics. The intervention involved making modifications to the collective agreement that would limit employees' entitlement to time off as compensation. The intervention group consisted of 493 and the control group of 2,303 health and social care shift workers, respectively. We analysed the objective pay roll-based working-hour data for 2012-2013, which we obtained from employers' records, using the repeated measures mixed model. The changes in objective working-hour characteristics were small, but systematic. The intervention had some positive effects: the amount of short recovery periods (<28 h) after the last night shift decreased from 5% to 3%, and the amount of working weeks of over 48 h decreased from 19% to 17%. The realization of employees' shift preferences increased from 18% to 20%. However, in contrast, consecutive work shifts and the number of scheduled absences increased and days off decreased, suggesting less time for recovery and thus a negative trend in shift ergonomics. When planning shifts, nursing management should avoid regulations that promote specific unhealthy shift characteristics, that is, consecutive work shifts and less days off.

  9. Effects of modifications to the health and social sector’s collective agreement on the objective characteristics of working hours

    PubMed Central

    ROPPONEN, Annina; VANTTOLA, Päivi; KOSKINEN, Aki; HAKOLA, Tarja; PUTTONEN, Sampsa; HÄRMÄ, Mikko

    2017-01-01

    This study aimed to evaluate the effects of an intervention on objective working-hour characteristics. The intervention involved making modifications to the collective agreement that would limit employees’ entitlement to time off as compensation. The intervention group consisted of 493 and the control group of 2,303 health and social care shift workers, respectively. We analysed the objective pay roll-based working-hour data for 2012–2013, which we obtained from employers’ records, using the repeated measures mixed model. The changes in objective working-hour characteristics were small, but systematic. The intervention had some positive effects: the amount of short recovery periods (<28 h) after the last night shift decreased from 5% to 3%, and the amount of working weeks of over 48 h decreased from 19% to 17%. The realization of employees’ shift preferences increased from 18% to 20%. However, in contrast, consecutive work shifts and the number of scheduled absences increased and days off decreased, suggesting less time for recovery and thus a negative trend in shift ergonomics. When planning shifts, nursing management should avoid regulations that promote specific unhealthy shift characteristics, that is, consecutive work shifts and less days off. PMID:28420807

  10. Recruitment techniques for alcohol pharmacotherapy clinical trials: A cost-benefit analysis

    PubMed Central

    Tompkins, D. Andrew; Sides, Jessica A.; Harrison, Joseph A.; Strain, Eric C.

    2014-01-01

    Objectives Alcohol use disorders (AUDs) represent a large public health burden with relatively few efficacious pharmacotherapies. Randomized controlled trials (RCTs) for new AUD therapies can be hampered by ineffective recruitment, leading to increased trial costs. The current analyses examined the effectiveness of recruitment efforts during two consecutive outpatient RCTs of novel AUD pharmacotherapies conducted between 2009 and 2012. Methods During an initial phone screen, participants identified an ad source for learning about the study. Qualified persons were then scheduled for in-person screens. The present analyses examined demographic differences amongst the eight ad sources utilized. Recruitment effectiveness was determined by dividing the number of persons meeting criteria for an in-person screen by the total number of callers from each ad source. Cost-effectiveness was determined by dividing total ad source cost by number of screens, participants randomized, and completers. Results 1,813 calls resulted in 1,005 completed phone screens. The most common ad source was TV (34%), followed by print (29%), word-of-mouth (11%), flyer (8%), internet (5%), radio (5%), bus ad (2%), and billboard (1%). Participants reporting bus ads (46%), billboard (44%), or print ads (34%) were significantly more likely than the other sources to meet criteria to be scheduled for in-person screens. The most cost-effective ad source was print ($2,506 per completer), while bus ad was the least cost-effective ($13,376 per completer). Conclusions Recruitment in AUD RCTs can be successful using diverse advertising methods. The present analyses favored use of print ads as most cost-effective. PMID:26752979

  11. Mental health care treatment initiation when mental health services are incorporated into primary care practice.

    PubMed

    Kessler, Rodger

    2012-01-01

    Most primary care patients with mental health issues are identified or treated in primary care rather than the specialty mental health system. Primary care physicians report that their patients do not have access to needed mental health care. When referrals are made to the specialty behavioral or mental health care system, rates of patients who initiate treatment are low. Collaborative care models, with mental health clinicians as part of the primary care medical staff, have been suggested as an alternative. The aim of this study is to examine rates of treatment startup in 2 collaborative care settings: a rural family medicine office and a suburban internal medicine office. In both practices referrals for mental health services are made within the practice. Referral data were drawn from 2 convenience samples of patients referred by primary care physicians for collaborative mental health treatment at Fletcher Allen Health Care in Vermont. The first sample consisted of 93 consecutively scheduled referrals in a family medicine office (sample A) between January 2006 and December 2007. The second sample consisted of 215 consecutive scheduled referrals at an internal medicine office (sample B) between January 2009 and December 2009. Referral data identified age, sex, and presenting mental health/medical problem. In sample A, 95.5% of those patients scheduling appointments began behavioral health treatment; in sample B this percentage was 82%. In sample B, 69% of all patients initially referred for mental health care both scheduled and initiated treatment. When referred to a mental health clinician who provides on-site access as part of a primary care mental health collaborative care model, a high percentage of patients referred scheduled care. Furthermore, of those who scheduled care, a high percentage of patients attend the scheduled appointment. Findings persist despite differences in practice type, populations, locations, and time frames of data collection. That the findings persist across the different offices suggests that this model of care may contain elements that improve the longstanding problem of poor treatment initiation rates when primary care physicians refer patients for outpatient behavioral health services.

  12. 7 CFR 274.2 - Providing benefits to participants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... throughout the month, or for a shorter period. When staggering benefit delivery, however, State agencies... household participating longer than two consecutive, complete months. Regardless of the issuance schedule... resumes through the end of the month or over a five-day period following the resumption of issuance, even...

  13. 7 CFR 274.2 - Providing benefits to participants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... throughout the month, or for a shorter period. When staggering benefit delivery, however, State agencies... household participating longer than two consecutive, complete months. Regardless of the issuance schedule... resumes through the end of the month or over a five-day period following the resumption of issuance, even...

  14. 7 CFR 274.2 - Providing benefits to participants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... throughout the month, or for a shorter period. When staggering benefit delivery, however, State agencies... household participating longer than two consecutive, complete months. Regardless of the issuance schedule... resumes through the end of the month or over a five-day period following the resumption of issuance, even...

  15. 5 CFR 531.403 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY UNDER THE GENERAL SCHEDULE... performance by an employee that warrants advancement of the employee's rate of basic pay to the next higher.... Calendar week means a period of any seven consecutive calendar days. Critical element has the meaning given...

  16. 14 CFR 121.523 - Flight time limitations: Crew of three or more pilots and additional airmen as required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... It shall also provide adequate sleeping quarters on the airplane whenever an airman is scheduled to... may be aloft as a flight crewmember for more than 350 hours in any 90 consecutive days. [Doc. No. 6258...

  17. 14 CFR 121.523 - Flight time limitations: Crew of three or more pilots and additional airmen as required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... It shall also provide adequate sleeping quarters on the airplane whenever an airman is scheduled to... may be aloft as a flight crewmember for more than 350 hours in any 90 consecutive days. [Doc. No. 6258...

  18. 14 CFR 121.523 - Flight time limitations: Crew of three or more pilots and additional airmen as required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... It shall also provide adequate sleeping quarters on the airplane whenever an airman is scheduled to... may be aloft as a flight crewmember for more than 350 hours in any 90 consecutive days. [Doc. No. 6258...

  19. 14 CFR 121.523 - Flight time limitations: Crew of three or more pilots and additional airmen as required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... It shall also provide adequate sleeping quarters on the airplane whenever an airman is scheduled to... may be aloft as a flight crewmember for more than 350 hours in any 90 consecutive days. [Doc. No. 6258...

  20. 14 CFR 121.523 - Flight time limitations: Crew of three or more pilots and additional airmen as required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... It shall also provide adequate sleeping quarters on the airplane whenever an airman is scheduled to... may be aloft as a flight crewmember for more than 350 hours in any 90 consecutive days. [Doc. No. 6258...

  1. 5 CFR 610.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS HOURS OF DUTY Weekly and Daily Scheduling of Work § 610.102 Definitions. In this subpart: Administrative workweek means any period of 7 consecutive 24-hour periods designated in advance by the head of the agency under section 6101 of title 5...

  2. 75 FR 10018 - Proposed Collection; Comment Request for Form 1041 and Related Schedules D, J, and K-1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... 1041 and Related Schedules D, J, and K-1 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION..., the IRS is soliciting comments concerning Form 1041 and related Schedules D, J, and K-1, U.S. Income..., Deductions, Credits, etc. (Schedule K-1). OMB Number: 1545-0092. Form Number: 1041 and related Schedules D, J...

  3. Impact of Nonmotor Symptoms on Disability in Patients with Parkinson's Disease

    ERIC Educational Resources Information Center

    Raggi, Alberto; Leonardi, Matilde; Carella, Francesco; Soliveri, Paola; Albanese, Alberto; Romito, Luigi M.

    2011-01-01

    Patients with Parkinson's disease have nonmotor symptoms (NMS) that, although poorly considered, have an impact on their quality of life. In contrast, the effect on disability is not systematically evaluated. Adult patients were consecutively enrolled and administered the Non-Motor Symptoms Questionnaire and the WHO Disability Assessment Schedule.…

  4. 78 FR 9814 - Drawbridge Operating Regulations; Gulf Intracoastal Waterway, Belle Chasse, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0031] Drawbridge... Louisiana State Route 23 (LA 23) vertical lift span bridge, also known as the Judge Perez Bridge, across the... consecutive days starting February 23, 2013, in order to perform scheduled maintenance. DATES: This deviation...

  5. 76 FR 21041 - Information about the DOL Notification Process for Worker Abandonment, or Termination for Cause...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... employment, or was terminated for cause before the end of the work contract period. DATES: This Notice is... employment fails to report for work at the regularly scheduled time for 5 consecutive work days without... DEPARTMENT OF LABOR Employment and Training Administration Information about the DOL Notification...

  6. U.S. Geological Survey Library classification system

    USGS Publications Warehouse

    Sasscer, R. Scott

    1992-01-01

    The U.S. Geological Survey library classification system has been designed for an earth science library. It is a tool for assigning classification numbers to earth science and allied pure science library materials in order to collect these materials into related subject groups on the library shelves and arrange them alphabetically by author and title. It can also be used as a retrieval system to access these materials through the subject and visible geographic classification numbers.The classification scheme has been developed over the years since 1904 to meet the ever-changing needs of increased specialization and new areas of study in the earth sciences.This system contains seven schedules:Subject scheduleGeological survey scheduleEarth science periodical scheduleGovernment documents periodical scheduleGeneral science periodical scheduleEarth science maps scheduleGeographic scheduleA geographic number, from the geographic schedule, is distinguished from other numbers in the system in that it is always enclosed in parentheses; for example, (200) is the geographic number for the United States.The geographic number is used in conjunction with the six other previously listed schedules, and it represents slightly different nuances of meanings, in respect to geographic locale, for each schedule.When used with a subject number, the geographic number indicates the country, state, province, or region in which the research was made. The subject number, 203, geology, when combined with the geographic number, (200), for example 203(200), is the classification number for library materials on the geology of the United States.The geographic number, combined with the capital letter G, for example, G(211), is the classification number for an earth science periodical issued by a geological association or university geology department in the State of Maine.When the letter S is combined with a geographic number, for example, S(276), it represents a general science periodical for a university or association in California.When the letter P is combined with a geographic number, for example, P(200), it represents a governmental periodical issued by the United States Federal Government.Geographic numbers standing alone represent classification numbers for the publications of geological surveys; for example, (200) represents publications of the U.S. Geological Survey.Map call numbers have a geographic number preceded by the capital letter M, followed by an abbreviated subject number.For example:M(200)2where:M = Map(200) = Geographic region of the United States2 = Abbreviation for the subject number 203— geology.The introduction, which follows this abstract, provides detailed procedures on the construction of complete call numbers for works falling into the framework of the aforesaid classification schedules.The tables following the introduction can be quickly accessed through the use of the newly expanded subject index.The purpose of this publication is to provide the earth science community with a classification and retrieval system for earth science materials, to provide sufficient explanation of its structure and use, and to enable library staff and clientele to classify or access research materials in a library collection.

  7. The effects of consecutive night shifts and shift length on cognitive performance and sleepiness: a field study.

    PubMed

    Haidarimoghadam, Rashid; Kazemi, Reza; Motamedzadeh, Majid; Golmohamadi, Rostam; Soltanian, Alireza; Zoghipaydar, Mohamad Reza

    2017-06-01

    The aim of this study was to evaluate the effects of consecutive night shifts (CNS) and shift length on cognitive performance and sleepiness. This study evaluated the sleepiness and performance of 30 control room operators (CROs) working in 7 nights, 7 days, 7 days off (7N7D7O) and 30 CROs working in 4 nights, 7 days, 3 nights, 7 days off (4N7D3N7O) shift patterns in a petrochemical complex on the last night shift before swinging into the day shift. To assess cognitive performance, the n-back test, continuous performance test and simple reaction time test were employed. To assess sleepiness, the Karolinska sleepiness scale was used. Both schedules indicated that the correct responses and response times of working memory were reduced (p = 0.001), while intentional errors and sleepiness increased during the shift work (p = 0.001). CNS had a significant impact on reaction time and commission errors (p = 0.001). The main duty of CROs at a petrochemical plant is checking hazardous processes which require appropriate alertness and cognitive performance. As a result, planning for appropriate working hours and suitable number of CNS in a rotating shift system is a contribution to improving CRO performance and enhancing safety.

  8. Visual Schedule System in Dental Care for Patients with Autism: A Pilot Study.

    PubMed

    Mah, Janet Wt; Tsang, Phoebe

    A pilot study to test whether a visual schedule system using picture communication symbols can help children with autism have successful routine dental cleaning visits. 14 boys with autism between three- to eight-years-old presented to the dental clinic for four weekly consecutive dental appointments. Patients were randomly assigned to either the control group who received the tell-show-do method (i.e., standard of care), or the test group who received the tell-show-do method plus the visual schedule system. Patients in the test group completed an average of 1.38 more steps, at 35.52 seconds per step faster, and with 18.7% lower levels of behavioral distress than those in the control group. The use of a visual schedule system, along with repeated weekly visits, showed some promise in helping children with autism successfully complete more steps, progress at a quicker rate, and exhibit lower levels of behavioral distress within a dental appointment, compared to a traditional tell-show-do approach.

  9. 75 FR 61840 - Proposed Collection; Comment Request for Form 5300 and Schedule Q (Form 5300)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... 5300 and Schedule Q (Form 5300) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... comments concerning Form 5300, Application for Determination for Employee Benefit Plan, and Schedule Q... Elective Determination Requests (Schedule Q (Form 5300)). OMB Number: 1545-0197. Form Number: Form 5300 and...

  10. 47 CFR Appendix to Part 52 - Deployment Schedule for Long-Term Database Methods for Local Number Portability

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Deployment Schedule for Long-Term Database Methods for Local Number Portability Appendix to Part 52 Telecommunication FEDERAL COMMUNICATIONS...—Deployment Schedule for Long-Term Database Methods for Local Number Portability Implementation must be...

  11. 47 CFR Appendix to Part 52 - Deployment Schedule for Long-Term Database Methods for Local Number Portability

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Deployment Schedule for Long-Term Database Methods for Local Number Portability Appendix to Part 52 Telecommunication FEDERAL COMMUNICATIONS...—Deployment Schedule for Long-Term Database Methods for Local Number Portability Implementation must be...

  12. 47 CFR Appendix to Part 52 - Deployment Schedule for Long-Term Database Methods for Local Number Portability

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Deployment Schedule for Long-Term Database Methods for Local Number Portability Appendix to Part 52 Telecommunication FEDERAL COMMUNICATIONS...—Deployment Schedule for Long-Term Database Methods for Local Number Portability Implementation must be...

  13. 47 CFR Appendix to Part 52 - Deployment Schedule for Long-Term Database Methods for Local Number Portability

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Deployment Schedule for Long-Term Database Methods for Local Number Portability Appendix to Part 52 Telecommunication FEDERAL COMMUNICATIONS...—Deployment Schedule for Long-Term Database Methods for Local Number Portability Implementation must be...

  14. 47 CFR Appendix to Part 52 - Deployment Schedule for Long-Term Database Methods for Local Number Portability

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Deployment Schedule for Long-Term Database Methods for Local Number Portability Appendix to Part 52 Telecommunication FEDERAL COMMUNICATIONS...—Deployment Schedule for Long-Term Database Methods for Local Number Portability Implementation must be...

  15. Overnight shift work: factors contributing to diagnostic discrepancies.

    PubMed

    Hanna, Tarek N; Loehfelm, Thomas; Khosa, Faisal; Rohatgi, Saurabh; Johnson, Jamlik-Omari

    2016-02-01

    The aims of the study are to identify factors contributing to preliminary interpretive discrepancies on overnight radiology resident shifts and apply this data in the context of known literature to draw parallels to attending overnight shift work schedules. Residents in one university-based training program provided preliminary interpretations of 18,488 overnight (11 pm–8 am) studies at a level 1 trauma center between July 1, 2013 and December 31, 2014. As part of their normal workflow and feedback, attendings scored the reports as major discrepancy, minor discrepancy, agree, and agree--good job. We retrospectively obtained the preliminary interpretation scores for each study. Total relative value units (RVUs) per shift were calculated as an indicator of overnight workload. The dataset was supplemented with information on trainee level, number of consecutive nights on night float, hour, modality, and per-shift RVU. The data were analyzed with proportional logistic regression and Fisher's exact test. There were 233 major discrepancies (1.26 %). Trainee level (senior vs. junior residents; 1.08 vs. 1.38 %; p < 0.05) and modality were significantly associated with performance. Increased workload affected more junior residents' performance, with R3 residents performing significantly worse on busier nights. Hour of the night was not significantly associated with performance, but there was a trend toward best performance at 2 am, with subsequent decreased accuracy throughout the remaining shift hours. Improved performance occurred after the first six night float shifts, presumably as residents acclimated to a night schedule. As overnight shift work schedules increase in popularity for residents and attendings, focused attention to factors impacting interpretative accuracy is warranted.

  16. Effect of recombinant human granulocyte colony-stimulating factor on efficacy of radiation therapy in tumor-bearing rats

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koji Kabaya; Masahiko Watanabe; Masaru Kusaka

    The effect of recombinant human granulocyte colony-stimulating factor on radiation-induced neutropenia and on growth of transplanted tumors treated by irradiation was investigated using tumor-bearing rats as a model for radiation therapy. In a preliminary study using normal rats, neutropenia induced by upper hemi-body irradiation at 3 Gy/day 5 times a week for 3 weeks was prevented by consecutive subcutaneous injections of rhG-CSF at 100 {mu}g/kg/day. Rats bearing Walker-256, a mammary tumor, were scheduled to receive upper hemibody irradiation at 3 Gy/day for 15 times in 3 weeks if white blood cell (WBC) counts were maintained above 3,000/{mu}l. In control tumor-bearingmore » rats not receiving rhG-CSF, irradiation was often withheld because of the decrease in WBC counts below 3,000/{mu}l. In contrast, a decrease in WBC counts below 3,000/{mu}l was rarely found in tumor-bearing rats injected daily with rhG-CSF. The average number of radiation treatments in control rats and rats treated with rhG-CSF was about 8 and 14, respectively, out of the scheduled 15 treatments in 3 weeks. Treatment with rgG-CSF made it possible to complete the radiation therapy regimen and thus inhibit the growth of the transplanted tumor more effectively. These results suggest that rgG-CSF may be useful to ensure radiation therapy on schedule in cancer patients. 20 refs., 4 figs., 1 tab.« less

  17. Preventive health pamphlets in the emergency department.

    PubMed

    Berger, P; Luskin, M; Krishel, S

    1998-01-01

    We conducted a prospective clinical trial to determine the effectiveness of an emergency department informational pamphlet in improving patients' compliance with recommendations that they receive Pap smears, mammograms, and a pneumococcal vaccination. Informational pamphlets were distributed to 1,000 consecutive patients who presented to a university-affiliated emergency department (ED). The pamphlet contained information stating the indications for obtaining routine Pap smears, mammograms, and a pneumococcal vaccination. Target individuals were women 18 years and older and men 65 years and older. Target patients were called approximately 2 months after their ED visits to obtain follow-up data. There were 464 target patients obtained from the 1,000 pamphlets distributed (409 female/55 male), and 68% (316) of the 464 were contacted by telephone for follow-up data. Significantly more women than men had read the pamphlet (62% vs. 8%). Of the women contacted (279), 31.9% (89) were not up to date (UTD) with Pap smears, and 11.2% (10) stated that they had scheduled an appointment for a Pap smear; 14.5% (11) of the women were not UTD with mammograms, and none had scheduled an appointment to receive care. Of the patients over age 65, 67% were not UTD with a pneumococcal vaccination, and no appointments were scheduled to obtain one. We conclude that a significant number of patients who present to this ED are in need of preventive health care. Emergency department informational pamphlets may have a role in improving Pap smear compliance. Women may be more likely then men to read informational pamphlets distributed in the ED.

  18. 33 CFR 117.35 - Temporary change to a drawbridge operating schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... District Commander for approval of the change. (2) The request must describe the reason for the closure and... receipt of the request. If the request is denied, the reasons for the denial will be set out in the... broken into separate time periods on the same day or on consecutive days, the drawbridge must provide...

  19. Reinforcement Schedules in Pacing Reading Rate. Final Report.

    ERIC Educational Resources Information Center

    Schutz, Richard E.; And Others

    Responses of individual fourth-grade children were monitored in daily 30-minute sessions for 10 consecutive school days. Individual subjects were used as their own controls. The child sat before a small table with a surface-mounted button and a wall-mounted screen upon which visual stimuli were rear-view projected, using a filmstrip projector with…

  20. 78 FR 23981 - Proposed Collection; Comment Request for Form 1041 and Related Schedules D, J, and K-1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... 1041 and Related Schedules D, J, and K-1 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION..., the IRS is soliciting comments concerning Form 1041 and related Schedules D, J, and K-1, U.S. Income... Share of Income, Deductions, Credits, etc. (Schedule K-1). OMB Number: 1545-0092. Form Number: 1041 and...

  1. Optimizing patient flow in a large hospital surgical centre by means of discrete-event computer simulation models.

    PubMed

    Ferreira, Rodrigo B; Coelli, Fernando C; Pereira, Wagner C A; Almeida, Renan M V R

    2008-12-01

    This study used the discrete-events computer simulation methodology to model a large hospital surgical centre (SC), in order to analyse the impact of increases in the number of post-anaesthetic beds (PABs), of changes in surgical room scheduling strategies and of increases in surgery numbers. The used inputs were: number of surgeries per day, type of surgical room scheduling, anaesthesia and surgery duration, surgical teams' specialty and number of PABs, and the main outputs were: number of surgeries per day, surgical rooms' use rate and blocking rate, surgical teams' use rate, patients' blocking rate, surgery delays (minutes) and the occurrence of postponed surgeries. Two basic strategies were implemented: in the first strategy, the number of PABs was increased under two assumptions: (a) following the scheduling plan actually used by the hospital (the 'rigid' scheduling - surgical rooms were previously assigned and assignments could not be changed) and (b) following a 'flexible' scheduling (surgical rooms, when available, could be freely used by any surgical team). In the second, the same analysis was performed, increasing the number of patients (up to the system 'feasible maximum') but fixing the number of PABs, in order to evaluate the impact of the number of patients over surgery delays. It was observed that the introduction of a flexible scheduling/increase in PABs would lead to a significant improvement in the SC productivity.

  2. 1 CFR 21.11 - Standard organization of the Code of Federal Regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... consists of the following structural units: (a) Titles, which are numbered consecutively in Arabic... are lettered consecutively in capitals throughout the chapter; (e) Parts, which are numbered in Arabic... Arabic throughout each part. A section number includes the number of the part followed by a period and...

  3. 1 CFR 21.11 - Standard organization of the Code of Federal Regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... consists of the following structural units: (a) Titles, which are numbered consecutively in Arabic... are lettered consecutively in capitals throughout the chapter; (e) Parts, which are numbered in Arabic... Arabic throughout each part. A section number includes the number of the part followed by a period and...

  4. 1 CFR 21.11 - Standard organization of the Code of Federal Regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... consists of the following structural units: (a) Titles, which are numbered consecutively in Arabic... are lettered consecutively in capitals throughout the chapter; (e) Parts, which are numbered in Arabic... Arabic throughout each part. A section number includes the number of the part followed by a period and...

  5. 1 CFR 21.11 - Standard organization of the Code of Federal Regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... consists of the following structural units: (a) Titles, which are numbered consecutively in Arabic... are lettered consecutively in capitals throughout the chapter; (e) Parts, which are numbered in Arabic... Arabic throughout each part. A section number includes the number of the part followed by a period and...

  6. Changes in the diurnal rhythms of cortisol, melatonin, and testosterone after 2, 4, and 7 consecutive night shifts in male police officers.

    PubMed

    Jensen, Marie Aarrebo; Hansen, Åse Marie; Kristiansen, Jesper; Nabe-Nielsen, Kirsten; Garde, Anne Helene

    2016-08-11

    Night work is associated with a large range of acute health problems and possibly also health consequences in the long run. Yet, only very few field studies specifically investigate the effects of consecutive night shift on key physiological regulatory systems. In this field study, we investigated the effects of consecutive night shifts on three hormones, melatonin, cortisol, and testosterone, among police officers at work. More specifically, the aim was to investigate how the diurnal rhythms of melatonin, cortisol, and testosterone responded to two, four, and seven consecutive night shifts and a corresponding number of days for recovery. The study was part of the "In the Middle of the Night" project and included 73 male police officers from five different police districts. The participants were exposed to three intervention conditions: "2+2": two consecutive night shifts followed by two consecutive day recovery days; "4+4": four consecutive night shifts followed by four consecutive recovery days; "7+7": seven consecutive night shifts followed by seven consecutive recovery days. On the last day with night shift and the last recovery day in each intervention, the participants collected saliva samples every 4th hour when awake. The diurnal rhythms of melatonin, cortisol, and testosterone were all affected differently by an increasing number of consecutive night shifts: the amplitude of the melatonin rhythm was suppressed by 4.9% per day (95% CI 1.4-8.2% per day; p = 0.006). The diurnal rhythm of cortisol phase was delayed with an increasing number of night shifts by 33 min/day (95% CI 18-48 min per day; p ≤ 0.001), but did not show any changes in amplitude. For the diurnal rhythm of testosterone, there was no effect of the number of consecutive night shifts and the diurnal rhythm completely followed the sleep/wake cycle. We found that there were no differences in the rhythms of melatonin, cortisol, and testosterone after 2, 4, and 7 recovery days, respectively. In conclusion, we found signs of desynchronization in terms of suppressed amplitude of melatonin and phase delay of salivary cortisol as a consequence of the increasing number of consecutive night shifts among police officers at work. Lack of synchronization has been suggested as a possible mechanism linking night work to disease, but this remains to be determined.

  7. Lecture: fotemustine in brain tumors.

    PubMed

    Silvani, A; Gaviani, P; Lamperti, E; Botturi, A; Ferrari, D; Simonetti, G; Salmaggi, A

    2011-11-01

    Fotemustine (FTMS) is a third-generation nitrosourea, in preclinical studies, FTMS compared favorably with carmustine (BCNU) and lomustine (CCNU) against several human tumor cell lines. In conventional schedule, FTMS is administered at a dose of 100 mg/sqm/week for three consecutive weeks as induction (I) treatment, followed by 100 mg/sqm every three weeks, after a 5-week rest, as maintenance (M). Several Italian groups reported the results using FTMS in malignant glioma patients recurring after temozolomide standard treatment. In these papers, the 6-progression free survival are ranging from 20 to 52%. With the schedule (I + M) myelosuppression is observed in more than 30% of patients, and thrombocytopenia and leukopenia are more frequent and significant in Temozolomide pretreated patients. On the bases of the hematological toxicities several authors experimented new schedules of FTMS administrated at low doses. Recently, some authors reported the interesting results of a multicenter study on recurrent glioblastoma multiforme patients combining FTMS with new antiangiogentic agent bevacizumab.

  8. 76 FR 52669 - Report on the Performance of Drug and Biologics Firms in Conducting Postmarketing Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...\\ Number of open PMRs 526 149. On-schedule open PMRs (see 477 (91%) 131 (88%). table 2 of this document). Off-schedule open PMRs (see 49 (9%) 18 (12%). table 3 of this document). Number of open PMCs \\2\\........ 473 307. On-schedule open PMCs (see 399 (84%) 236 (77%). table 4 of this document). Off-schedule open...

  9. Daily Profiles of Light Exposure and Evening Use of Light-emitting Devices in Young Adults Complaining of a Delayed Sleep Schedule.

    PubMed

    Van der Maren, Solenne; Moderie, Christophe; Duclos, Catherine; Paquet, Jean; Daneault, Véronique; Dumont, Marie

    2018-04-01

    A number of factors can contribute to a delayed sleep schedule. An important factor could be a daily profile of light exposure favoring a later circadian phase. This study aimed to compare light exposure between 14 young adults complaining of a delayed sleep schedule and 14 matched controls and to identify possible associations between habitual light exposure and circadian phase. Exposure to white and blue light was recorded with ambulatory monitors for 7 consecutive days. Participants also noted their daily use of light-emitting devices before bedtime. Endogenous circadian phase was estimated with the dim light melatonin onset (DLMO) in the laboratory. The amplitude of the light-dark cycle to which the subjects were exposed was smaller in delayed than in control subjects, and smaller amplitude was associated with a later DLMO. Smaller amplitude was due to both decreased exposure in the daytime and increased exposure at night. Total exposure to blue light, but not to white light, was lower in delayed subjects, possibly due to lower exposure to blue-rich outdoor light. Lower daily exposure to blue light was associated with a later DLMO. Timing of relative increases and decreases of light exposure in relation to endogenous circadian phase was also compared between the 2 groups. In delayed subjects, there was a relatively higher exposure to white and blue light 2 h after DLMO, a circadian time with maximal phase-delaying effect. Delayed participants also had higher exposure to light 8 to 10 h after DLMO, which occurred mostly during their sleep episode but may have some phase-advancing effects. Self-reported use of light-emitting devices before bedtime was higher in delayed than in control subjects and was associated with a later DLMO. This study suggests that individuals complaining of a delayed sleep schedule engage in light-related behaviors favoring a later circadian phase and a later bedtime.

  10. Quality of Life, Disability, and Body Mass Index Are Related in Obese Patients

    ERIC Educational Resources Information Center

    Sirtori, Anna; Brunani, Amelia; Liuzzi, Antonio; Pasqualinotto, Lucia; Villa, Valentina; Leonardi, Matilde; Raggi, Alberto

    2011-01-01

    The aim of this study is to analyze the relationship between health-related quality of life (QoL), disability, and degree of obesity. Adult obese patients (BMI greater than 30) were consecutively enrolled in this cross-sectional observational study. The WHO Disability Assessment Schedule (WHO-DAS II) and the short version of the impact of weight…

  11. Analysis of the Relationship between the "n"th Root Which Is a Whole Number and the "n" Consecutive Odd Numbers

    ERIC Educational Resources Information Center

    Kwenge, Erasmus; Mwewa, Peter; Mulenga, H. M.

    2015-01-01

    The study was undertaken to establish the relationship between the roots of the perfect numbers and the "n" consecutive odd numbers. Odd numbers were arranged in such a way that their sums were either equal to the perfect square number or equal to a cube. The findings on the patterns and relationships of the numbers showed that there was…

  12. Scheduling periodic jobs that allow imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1990-01-01

    The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

  13. Design of ProjectRun21: a 14-week prospective cohort study of the influence of running experience and running pace on running-related injury in half-marathoners.

    PubMed

    Damsted, Camma; Parner, Erik Thorlund; Sørensen, Henrik; Malisoux, Laurent; Nielsen, Rasmus Oestergaard

    2017-11-06

    Participation in half-marathon has been steeply increasing during the past decade. In line, a vast number of half-marathon running schedules has surfaced. Unfortunately, the injury incidence proportion for half-marathoners has been found to exceed 30% during 1-year follow-up. The majority of running-related injuries are suggested to develop as overuse injuries, which leads to injury if the cumulative training load over one or more training sessions exceeds the runners' load capacity for adaptive tissue repair. Owing to an increase of load capacity along with adaptive running training, the runners' running experience and pace abilities can be used as estimates for load capacity. Since no evidence-based knowledge exist of how to plan appropriate half-marathon running schedules considering the level of running experience and running pace, the aim of ProjectRun21 is to investigate the association between running experience or running pace and the risk of running-related injury. Healthy runners using Global Positioning System (GPS) watch between 18 and 65 years will be invited to participate in this 14-week prospective cohort study. Runners will be allowed to self-select one of three half-marathon running schedules developed for the study. Running data will be collected objectively by GPS. Injury will be based on the consensus-based time loss definition by Yamato et al.: "Running-related (training or competition) musculoskeletal pain in the lower limbs that causes a restriction on or stoppage of running (distance, speed, duration, or training) for at least 7 days or 3 consecutive scheduled training sessions, or that requires the runner to consult a physician or other health professional". Running experience and running pace will be included as primary exposures, while the exposure to running is pre-fixed in the running schedules and thereby conditioned by design. Time-to-event models will be used for analytical purposes. ProjectRun21 will examine if particular subgroups of runners with certain running experiences and running paces seem to sustain more running-related injuries compared with other subgroups of runners. This will enable sport coaches, physiotherapists as well as the runners to evaluate their injury risk of taking up a 14-week running schedule for half-marathon.

  14. Sums of Consecutive Integers

    ERIC Educational Resources Information Center

    Pong, Wai Yan

    2007-01-01

    We begin by answering the question, "Which natural numbers are sums of consecutive integers?" We then go on to explore the set of lengths (numbers of summands) in the decompositions of an integer as such sums.

  15. New Scheduling Algorithms for Agile All-Photonic Networks

    NASA Astrophysics Data System (ADS)

    Mehri, Mohammad Saleh; Ghaffarpour Rahbar, Akbar

    2017-12-01

    An optical overlaid star network is a class of agile all-photonic networks that consists of one or more core node(s) at the center of the star network and a number of edge nodes around the core node. In this architecture, a core node may use a scheduling algorithm for transmission of traffic through the network. A core node is responsible for scheduling optical packets that arrive from edge nodes and switching them toward their destinations. Nowadays, most edge nodes use virtual output queue (VOQ) architecture for buffering client packets to achieve high throughput. This paper presents two efficient scheduling algorithms called discretionary iterative matching (DIM) and adaptive DIM. These schedulers find maximum matching in a small number of iterations and provide high throughput and incur low delay. The number of arbiters in these schedulers and the number of messages exchanged between inputs and outputs of a core node are reduced. We show that DIM and adaptive DIM can provide better performance in comparison with iterative round-robin matching with SLIP (iSLIP). SLIP means the act of sliding for a short distance to select one of the requested connections based on the scheduling algorithm.

  16. The prevalence of trauma and its relationship to borderline personality symptoms and self-destructive behaviors in a primary care setting.

    PubMed

    Sansone, R A; Sansone, L A; Wiederman, M

    1995-05-01

    To determine the prevalence of five types of trauma and their relationship to borderline personality symptoms and self-destructive behaviors in female subjects recruited from a primary care setting. Consecutive sample. Subjects completed a lengthy research booklet. Primary care, outpatient, health maintenance organization setting. One hundred fifty-two consecutive women, aged 18 to 45 years, who were scheduled for routine gynecological care by a female family physician. Measures included a demographic questionnaire, a trauma questionnaire (ie, sexual, physical, and emotional abuse, physical neglect, and witnessing of violence), the Borderline Personality Scale of the Personality Diagnostic Questionnaire-Revised; and the Self-Harm Inventory. Traumatic experiences were reported by 70.7% of the subjects (25.8%, sexual abuse; 36.4%, physical abuse; 43.7%, emotional abuse; 9.3%, physical neglect; and 43.0%, witnessing of violence). There was a significant correlation between the acknowledged number of abuse categories and borderline personality symptoms (r = .36, P = .01) as well as self-destructive behaviors (r = .43, P = .01). Sexual abuse and witnessing of violence were most associated with borderline personality symptoms; sexual abuse, physical abuse, and witnessing of violence were most associated with self-destructive behaviors. This study provides further evidence that abuse is a nonspecific but contributory factor to psychopathologic processes, in particular borderline personality symptoms and self-destructive behaviors.

  17. Effect of reducing interns' weekly work hours on sleep and attentional failures.

    PubMed

    Lockley, Steven W; Cronin, John W; Evans, Erin E; Cade, Brian E; Lee, Clark J; Landrigan, Christopher P; Rothschild, Jeffrey M; Katz, Joel T; Lilly, Craig M; Stone, Peter H; Aeschbach, Daniel; Czeisler, Charles A

    2004-10-28

    Knowledge of the physiological effects of extended (24 hours or more) work shifts in postgraduate medical training is limited. We aimed to quantify work hours, sleep, and attentional failures among first-year residents (postgraduate year 1) during a traditional rotation schedule that included extended work shifts and during an intervention schedule that limited scheduled work hours to 16 or fewer consecutive hours. Twenty interns were studied during two three-week rotations in intensive care units, each during both the traditional and the intervention schedule. Subjects completed daily sleep logs that were validated with regular weekly episodes (72 to 96 hours) of continuous polysomnography (r=0.94) and work logs that were validated by means of direct observation by study staff (r=0.98). Seventeen of 20 interns worked more than 80 hours per week during the traditional schedule (mean, 84.9; range, 74.2 to 92.1). All interns worked less than 80 hours per week during the intervention schedule (mean, 65.4; range, 57.6 to 76.3). On average, interns worked 19.5 hours per week less (P<0.001), slept 5.8 hours per week more (P<0.001), slept more in the 24 hours preceding each working hour (P<0.001), and had less than half the rate of attentional failures while working during on-call nights (P=0.02) on the intervention schedule as compared with the traditional schedule. Eliminating interns' extended work shifts in an intensive care unit significantly increased sleep and decreased attentional failures during night work hours. Copyright 2004 Massachusetts Medical Society.

  18. Exploring the Sums of Powers of Consecutive q-Integers

    ERIC Educational Resources Information Center

    Kim, T.; Ryoo, C. S.; Jang, L. C.; Rim, S. H.

    2005-01-01

    The Bernoulli numbers are among the most interesting and important number sequences in mathematics. They first appeared in the posthumous work "Ars Conjectandi" (1713) by Jacob Bernoulli (1654-1705) in connection with sums of powers of consecutive integers (Bernoulli, 1713; or Smith, 1959). Bernoulli numbers are particularly important in number…

  19. A new postoperative pain management (intravenous acetaminophen: Acelio®) leads to enhanced recovery after esophagectomy: a propensity score-matched analysis.

    PubMed

    Ohkura, Yu; Shindoh, Junichi; Ueno, Masaki; Iizuka, Toshiro; Haruta, Shusuke; Udagawa, Harushi

    2018-05-01

    To investigate the efficacy of postoperative scheduled intravenous acetaminophen to reduce the opioid use and enhance the recovery after esophagectomy. A propensity score-matched population was created using the 93 and 69 consecutive patients who underwent esophagectomy for esophageal cancer before and after the introduction of postoperative scheduled intravenous acetaminophen, and the short-term clinical outcomes were compared. Significant defervescence was demonstrated in the Acetaminophen group (A-group) compared with control group (C-group) during the perioperative period (p < 0.05), whereas no significant differences were observed in the postoperative inflammatory parameters. The incidence of postoperative complications was similar between the groups. The number of PCA pushes and the frequency of using other non-opioid analgesics were significantly smaller in the A-group than in the C-group (p < 0.05). Both daily and cumulative opioid uses were significantly smaller in the A-group than in the C-group (p < 0.05). The time to first flatus was significantly shorter in the A-group than in the C-group (p < 0.001). The day of first walking after surgery was significantly earlier in the A-group than in the C-group (1.0 versus 2.0 days, p = 0.003). The ICU stay (2.86 versus 3.61 days, p < 0.001) and the hospital stay (21.5 versus 26.0 days, p = 0.061) tended to be shorter in the A-group than in the C-group. Postoperative scheduled intravenous acetaminophen decreased the rate of opioid use without increasing the intensity of postoperative pain and may be a feasible new pain management option in the enhanced recovery after surgery protocol following esophagectomy.

  20. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    DTIC Science & Technology

    1987-09-15

    MAC; CODE NUMBER: NONE AND REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL). RESPONSIBILITY: ROY & ILS DURATION: 32.00 WORK DAYS PRE PPPL SCHEDULE...ILS DURATION: 22.00 WORK DAYS R/V PPPL SCHEDULE: DVPMARPS REVIEW AND VALIDATE PRELIMINARY PROVISIONING PARTS LIST. CODE NUMBER: NONE RESPONSIBILITY

  1. Anodal transcranial direct current stimulation over the primary motor cortex does not enhance the learning benefits of self-controlled feedback schedules.

    PubMed

    Carter, Michael J; Smith, Victoria; Carlsen, Anthony N; Ste-Marie, Diane M

    2018-05-01

    A distinct learning advantage has been shown when participants control their knowledge of results (KR) scheduling during practice compared to when the same KR schedule is imposed on the learner without choice (i.e., yoked schedules). Although the learning advantages of self-controlled KR schedules are well-documented, the brain regions contributing to these advantages remain unknown. Identifying key brain regions would not only advance our theoretical understanding of the mechanisms underlying self-controlled learning advantages, but would also highlight regions that could be targeted in more applied settings to boost the already beneficial effects of self-controlled KR schedules. Here, we investigated whether applying anodal transcranial direct current stimulation (tDCS) to the primary motor cortex (M1) would enhance the typically found benefits of learning a novel motor skill with a self-controlled KR schedule. Participants practiced a spatiotemporal task in one of four groups using a factorial combination of KR schedule (self-controlled vs. yoked) and tDCS (anodal vs. sham). Testing occurred on two consecutive days with spatial and temporal accuracy measured on both days and learning was assessed using 24-h retention and transfer tests without KR. All groups improved their performance in practice and a significant effect for practicing with a self-controlled KR schedule compared to a yoked schedule was found for temporal accuracy in transfer, but a similar advantage was not evident in retention. There were no significant differences as a function of KR schedule or tDCS for spatial accuracy in retention or transfer. The lack of a significant tDCS effect suggests that M1 may not strongly contribute to self-controlled KR learning advantages; however, caution is advised with this interpretation as typical self-controlled learning benefits were not strongly replicated in the present experiment.

  2. U.S. Geological Survey Library classification system

    USGS Publications Warehouse

    Sasscer, R. Scott

    2000-01-01

    The U.S. Geological Survey Library classification system has been designed for earth science libraries. It is a tool for assigning call numbers to earth science and allied pure science materials in order to collect these materials into related subject groups on the library shelves and arrange them alphabetically by author and title. The classification can be used as a retrieval system to access materials through the subject and geographic numbers.The classification scheme has been developed over the years since 1904 to meet the ever-changing needs of increased specialization and the development of new areas of research in the earth sciences. The system contains seven schedules: Subject scheduleGeological survey schedule Earth science periodical scheduleGovernment document periodical scheduleGeneral science periodical schedule Earth science map schedule Geographic schedule Introduction provides detailed instructions on the construction of call numbers for works falling into the framework of the classification schedules.The tables following the introduction can be quickly accessed through the use of the newly expanded subject index.The purpose of this publication is to provide the earth science community with a classification and retrieval system for earth science materials, to offer sufficient explanation of its structure and use, and to enable library staff and clientele to classify or access research materials in a library collection.

  3. 77 FR 55254 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Options Fee Schedule (``Fee Schedule'') to change the number of Amex Trading Permits (``ATP'') required by... (``ATP'') required by NYSE Amex Market Makers based on the number of options in their electronic... in their trading appointment, subject to the following schedule: (1) Market Makers with one ATP may...

  4. Comparison of the effects block and traditional schedules have on the number of students who are proficient on the Biology End-of-Course Test in forty public high schools in the state of North Carolina

    NASA Astrophysics Data System (ADS)

    Bonner, Tonia Anita

    This study examined the difference between the number of overall students, African-American students, and students with disabilities on a semester 4 x 4 block schedule who were proficient on the North Carolina Biology End-of-Course Test and the number of the same group of students on a traditional 45-50 minute yearlong schedule who were proficient on the NC Biology End-of-Course Test in the state of North Carolina during the 2009--2010 school year. A causal-comparative design was used and three null hypotheses were tested using chi-square analysis. Archival data was used. The results showed that there was a significant association between the number of the overall students and African-American students who were proficient on the NC Biology EOC Test when taught biology on a 4 x 4 semester block versus a traditional schedule. However, no statistically significant relationship existed between the number of students with disabilities who were educated on 4 x 4 semester block schedule and those students with disabilities who were educated on a six or seven period traditional schedule in biology. Suggestions for further research are included.

  5. Management implications for the perioperative surgical home related to inpatient case cancellations and add-on case scheduling on the day of surgery.

    PubMed

    Epstein, Richard H; Dexter, Franklin

    2015-07-01

    The American Society of Anesthesiologists has embraced the concept of the Perioperative Surgical Home as a means through which anesthesiologists can add value to the health systems in which they practice. One key listed element of the Perioperative Surgical Home is to support "scheduling initiatives to reduce cancellations and increase efficiency." In this study, we explored the potential benefits of the Perioperative Surgical Home with respect to inpatient cancellations and add-on case scheduling. We evaluated 6 hypotheses related to the timing of inpatient cancellations and preoperative anesthesia evaluations. Inpatient cancellations were studied during 26 consecutive 4-week intervals between July 2012 and June 2014 at a tertiary care academic hospital. All timestamps related to scheduling, rescheduling, and cancellation activities were retrieved from the operating room (OR) case scheduling system. Timestamps when patients were seen by anesthesia residents were obtained from the preoperative evaluation system database. Batch mean methods were used to calculate means and SE. For cases cancelled, we determined whether, for "most" (>50%) cancellations, a subsequent procedure (of any type) was performed on the patient within 7 days of the cancellation. Comparisons with most and other fractions were assessed using the 1 group, 1-sided Student t test. We evaluated whether a few procedures were highly represented among the cancelled cases via the Herfindahl (Simpson's) index, comparing it with <0.15. The rate of scheduling activity was assessed by computing the number of OR scheduling office decisions in each 1-hour bin between 6:00 AM and 3:59 PM. These values were compared with ≥1 decision per hour at the study hospital. Data from 24,735 scheduled inpatient cases were assessed. Cases cancelled after 7 AM on the day before or at any time on the scheduled day of surgery accounted for 22.6% ± 0.5% (SE) of the scheduled minutes all scheduled cases, and 26.8% ± 0.4% of the case volume (i.e., number of cases). Most (83.1% ± 0.6%, P < 10) cases performed were evaluated on the day before surgery. Most (67.6% ± 1.6%, P < 10) minutes of cancelled cases were evaluated on the day before surgery. Most (62.3% ± 1.5%, P < 10) cases were seen earlier than 6:00 PM of the day before surgery. The Herfindahl index among cancelled procedures was 0.021 ± 0.001 (P < 10 compared not only to <0.15 but also to <0.05), showing large heterogeneity among the cancelled procedures. A subsequent procedure was not performed for most cancelled cases (50.6% ± 0.9% compared with >50%, P = 0.12), implying that the indication for the cancelled procedure no longer existed or the patient/family decided not to proceed with surgery. When only cancellations on the scheduled day of surgery were considered, the cancellation rate was 14.0% ± 0.3% of scheduled inpatient minutes and 11.8% ± 0.2% of scheduled inpatient cases. There were 0.59 ± 0.02 OR schedule decisions per hour per 10 ORs between 6:00 AM and 3:59 PM (P < 10, corresponding to ≥1 decision per hour at the 36 OR study hospital). The study hospital had a high inpatient cancellation rate, despite the fact that most patients whose cases were cancelled were seen by an anesthesia resident by 6:00 PM of the day before surgery. This finding suggests that further efforts to reduce the cancellations by seeing patients sooner on the day before surgery, or seeing even more patients the day before surgery, would not be an economically useful focus of the Perioperative Surgical Home. The wide heterogeneity among cancelled cases indicates that focusing on a few procedures would not materially affect the overall cancellation rate. The relatively low rate of subsequent performance of a procedure on patients whose cases had been cancelled suggests that trying to decrease the cancellation rate might be medically counterproductive. The hourly rate of decisions in the scheduling office during regular work hours on the day of surgery highlights the importance of decisions made at the OR control desk and scheduling office throughout the day to reduce the hours of overused OR time. These data suggest that efforts of the Perioperative Surgical Home related to inpatient cancellations should focus on management decision-making to mitigate the disruptions to the planned OR schedule caused by inpatient case cancellations and add-on cases, more so than on efforts to reduce inpatient cancellation rates.

  6. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  7. Comparison of the Effects Block and Traditional Schedules Have on the Number of Students Who Are Proficient on the Biology End-of-Course Test in Forty Public High Schools in the State of North Carolina

    ERIC Educational Resources Information Center

    Bonner, Tonia Anita

    2012-01-01

    This study examined the difference between the number of overall students, African-American students, and students with disabilities on a semester 4 x 4 block schedule who were proficient on the North Carolina Biology End-of-Course Test and the number of the same group of students on a traditional 45-50 minute yearlong schedule who were proficient…

  8. A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan

    NASA Astrophysics Data System (ADS)

    Bhongade, A. S.; Khodke, P. M.

    2014-04-01

    Manufacturing systems, in which, several parts are processed through machining workstations and later assembled to form final products, is common. Though scheduling of such problems are solved using heuristics, available solution approaches can provide solution for only moderate sized problems due to large computation time required. In this work, scheduling approach is developed for such flow-shop manufacturing system having machining workstations followed by assembly workstations. The initial schedule is generated using Disjunctive method and genetic algorithm (GA) is applied further for generating schedule for large sized problems. GA is found to give near optimal solution based on the deviation of makespan from lower bound. The lower bound of makespan of such problem is estimated and percent deviation of makespan from lower bounds is used as a performance measure to evaluate the schedules. Computational experiments are conducted on problems developed using fractional factorial orthogonal array, varying the number of parts per product, number of products, and number of workstations (ranging upto 1,520 number of operations). A statistical analysis indicated the significance of all the three factors considered. It is concluded that GA method can obtain optimal makespan.

  9. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of...

  10. Sleep and performance in simulated Navy watch schedules.

    PubMed

    Skornyakov, Elena; Shattuck, Nita L; Winser, Michael A; Matsangas, Panagiotis; Sparrow, Amy R; Layton, Matthew E; Gabehart, Rylie J; Van Dongen, Hans P A

    2017-02-01

    To operate Navy ships 24h per day, watchstanding is needed around the clock, with watch periods reflecting a variety of rotating or fixed shift schedules. The 5/15 watch schedule cycles through watch periods with 5h on, 15h off watch, such that watches occur 4h earlier on the clock each day - that is, the watches rotate backward. The timing of sleep varies over 4-day cycles, and sleep is split on some days to accommodate nighttime watchstanding. The 3/9 watch schedule cycles through watch periods with 3h on, 9h off watch, allowing for consistent sleep timing over days. In some sections of the 3/9 watch schedule, sleep may need to be split to accommodate nighttime watchstanding. In both the 5/15 and 3/9 watch schedules, four watch sections alternate to cover the 24h of the day. Here we compared sleep duration, psychomotor vigilance and subjective sleepiness in simulated sections of the 5/15 and 3/9 watch schedules. Fifteen healthy male subjects spent 6 consecutive days (5 nights) in the laboratory. Sleep opportunities were restricted to an average of 6.5h daily. Actigraphically estimated sleep duration was 5.6h per watch day on average, with no significant difference between watch sections. Sleep duration was not reduced when sleep opportunities were split. Psychomotor vigilance degraded over watch days, and tended to be more variable in the 5/15 than in the 3/9 watch sections. These laboratory-based findings suggest that Navy watch schedules are associated with cumulative sleep loss and a build-up of fatigue across days. The fixed watch periods of the 3/9 watch schedule appear to yield more stable performance than the backward rotating watch periods of the 5/15 watch schedule. Optimal performance may require longer and more consistent daily opportunities for sleep than are typically obtained in Navy operations. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. The effects of differing response-force requirements on fixed-ratio responding of rats.

    PubMed Central

    Alling, K; Poling, A

    1995-01-01

    Rats were exposed to two-component multiple schedules of food delivery. In the first experiment, 15 responses were required to produce food in both components. A downward force of 0.25 N (25 g) was always required to operate the response lever in one component. In the other, the required force was 0.25, 0.50, 1.00, or 2.00 N (25, 50, 100, or 200 g). In the second experiment, 0.25 N of force operated the lever in one component, but in the other, the force requirement for five consecutive responses at the beginning, middle, or end of each ratio was increased from 0.25 to 2.00 N. In the third experiment, the number of responses required to produce food was reduced from 15 to 5, and then to 1. Again, the effects of altering response force from 0.25 to 2.00 N were examined. In general, as response force increased in all experiments, mean response rates decreased and mean interresponse times increased. PMID:7751836

  12. Advertisement scheduling on commercial radio station using genetics algorithm

    NASA Astrophysics Data System (ADS)

    Purnamawati, S.; Nababan, E. B.; Tsani, B.; Taqyuddin, R.; Rahmat, R. F.

    2018-03-01

    On the commercial radio station, the advertising schedule is done manually, which resulted in ineffectiveness of ads schedule. Playback time consists of two types such as prime time and regular time. Radio Ads scheduling will be discussed in this research is based on ad playback schedule between 5am until 12am which rules every 15 minutes. It provides 3 slots ads with playback duration per ads maximum is 1 minute. If the radio broadcast time per day is 12 hours, then the maximum number of ads per day which can be aired is 76 ads. The other is the enactment of rules of prime time, namely the hours where the common people (listeners) have the greatest opportunity to listen to the radio, namely between the hours and hours of 4 am - 8 am, 6 pm - 10 pm. The number of screenings of the same ads on one day are limited to prime time ie 5 times, while for regular time is 8 times. Radio scheduling process is done using genetic algorithms which are composed of processes initialization chromosomes, selection, crossover and mutation. Study on chromosome 3 genes, each chromosome will be evaluated based on the value of fitness calculated based on the number of infractions that occurred on each individual chromosome. Where rule 1 is the number of screenings per ads must not be more than 5 times per day and rule 2 is there should never be two or more scheduling ads delivered on the same day and time. After fitness value of each chromosome is acquired, then the do the selection, crossover and mutation. From this research result, the optimal advertising schedule with schedule a whole day and ads data playback time ads with this level of accuracy: the average percentage was 83.79%.

  13. Representations and evolutionary operators for the scheduling of pump operations in water distribution networks.

    PubMed

    López-Ibáñez, Manuel; Prasad, T Devi; Paechter, Ben

    2011-01-01

    Reducing the energy consumption of water distribution networks has never had more significance. The greatest energy savings can be obtained by carefully scheduling the operations of pumps. Schedules can be defined either implicitly, in terms of other elements of the network such as tank levels; or explicitly, by specifying the time during which each pump is on/off. The traditional representation of explicit schedules is a string of binary values with each bit representing pump on/off status during a particular time interval. In this paper, we formally define and analyze two new explicit representations based on time-controlled triggers, where the maximum number of pump switches is established beforehand and the schedule may contain fewer than the maximum number of switches. In these representations, a pump schedule is divided into a series of integers with each integer representing the number of hours for which a pump is active/inactive. This reduces the number of potential schedules compared to the binary representation, and allows the algorithm to operate on the feasible region of the search space. We propose evolutionary operators for these two new representations. The new representations and their corresponding operations are compared with the two most-used representations in pump scheduling, namely, binary representation and level-controlled triggers. A detailed statistical analysis of the results indicates which parameters have the greatest effect on the performance of evolutionary algorithms. The empirical results show that an evolutionary algorithm using the proposed representations is an improvement over the results obtained by a recent state of the art hybrid genetic algorithm for pump scheduling using level-controlled triggers.

  14. Childhood acute promyelocytic leukemia: no benefit of all-trans-retinoic acid administered in a short-course schedule.

    PubMed

    Zubizarreta, P A; Rose, A B; Felice, M S; Alfaro, E; Delfino, S; Cygler, A M; Sackmann-Muriel, F

    2000-03-01

    From January 1990 to August 1997, 29 consecutive patients were treated with newly diagnosed primary acute promyelocytic leukemia (APL) at the authors' Institution. Of these, 27 (16 boys and 11 girls) were evaluable. Median age at diagnosis was 6.3 (range: 1.9-15.7) years. This population was treated with two consecutive protocols: 13 patients were included in the AML-HPG-90 protocol and 14 in the AML-HPG-95. The initial treatment was the same for both protocols: an induction 8-day phase with cytarabine, idarubicin, and etoposide was followed by a consolidation with cyclophosphamide, cytarabine, 6-mercaptopurine, vincristine, doxorubicin, and prednisone. Two courses of intensification with high-dose (HD) cytarabine and etoposide were given in the first study. Only one intensification course was administered in the second study, with HD cytarabine plus idarubicin or etoposide decided by randomization. Complete remission was achieved in 67% (18/27) of cases. Mortality on induction was quite high, 30% (8/27) mainly due to hemorrhages from disseminated intravascular coagulation (DIC). The event-free survival estimate for all patients was 0.47 (SE: 0.1). From April 1994, all-trans-retinoic acid (ATRA) was administered just during the first days of the induction phase (median: 9, range: 2-27) to stop or prevent DIC. Eighteen patients received ATRA and 9 did not. Three patients developed signs of ATRA syndrome during the first days of administration but no one died due to this toxicity. The impact of a short course of ATRA on early control of DIC was studied by analyzing the number of platelet, cryoprecipitate, and fresh frozen plasma transfusions during the induction phase in both groups. No statistical differences in complete remission rate, early mortality, need of transfusion of blood components for DIC, and survival estimates could be established between patients who received ATRA and those who did not. ATRA used in a short-course schedule during induction of APL did not stop early mortality due to DIC. Moreover, survival results did not improve with this method of ATRA usage. Longer periods of ATRA administration during APL therapy are strongly recommended.

  15. Shift Schedules and Intern Work Hours, Patient Numbers, Conference Attendance, and Sleep at a Single Pediatric Residency Program.

    PubMed

    Kocolas, Irene; Day, Kristen; King, Marta; Stevenson, Adam; Sheng, Xiaoming; Hobson, Wendy; Bruse, Jaime; Bale, James

    2017-03-01

    The effects of 2011 Accreditation Council on Graduate Medical Education (ACGME) duty hour standards on intern work hours, patient load, conference attendance, and sleep have not been fully determined. We prospectively compared intern work hours, patient numbers, conference attendance, sleep duration, pattern, and quality in a 2011 ACGME duty hour-compliant shift schedule with a 2003 ACGME duty hour-compliant call schedule at a single pediatric residency program. Interns were assigned to shift or call schedules during 4 alternate months in the winter of 2010-2011. Work hours, patient numbers, conference attendance, sleep duration, pattern, and quality were tracked. Interns worked significantly fewer hours per week on day (73.2 hours) or night (71.6 hours) shifts than during q4 call (79.6 hours; P < .01). During high census months, shift schedule interns cared for significantly more patients/day (8.1/day shift vs 6.2/call; P < .001) and attended significantly fewer conferences than call schedule interns. Night shift interns slept more hours per 24-hour period than call schedule interns (7.2 ± 0.5 vs 6.3 ± 0.9 hours; P < .05) and had more consistent sleep patterns. A shift schedule resulted in reduced intern work hours and improved sleep duration and pattern. Although intern didactic conference attendance declined significantly during high census months, opportunities for experiential learning remained robust with unchanged or increased intern patient numbers. Copyright © 2016 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  16. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    PubMed

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  17. Evaluating the learning experience of non medical prescribing students with their designated medical practitioners in their period of learning in practice: results of a survey.

    PubMed

    Ahuja, Jaya

    2009-11-01

    To evaluate the learning experience of non medical prescribing (NMP) students during their period of learning in practice and to explore strategies for improvement. A self-administered questionnaire was used to collect data from two consecutive NMP student cohorts. Of 57 NMP students, the majority (64.9%) worked in primary care setting. In contrast to those from primary care setting, the students working in secondary/tertiary care setting had significantly greater chance of knowing their designated medical practitioner (DMP) prior to starting their course (p=0.044). However, this did not influence whether the student did a learning agreement and time schedule agreement with the DMP at the beginning of practice setting. A learning agreement and time schedule was done by 91.2% and 57.9% students, respectively, at beginning of the course. Prior time schedule agreement was a significant determinant in determining the number of hours that student spent subsequently under direct supervision of DMP: 75.8% of those who did a prior time schedule spent >30% of practice hours under the direct supervision of DMP as compared to only 50% of those who did not. Spending >30% of the practice hours under direct supervision of the DMP was significantly associated with student satisfaction (p=0.025). There was greater likelihood of a student being assessed formatively if a prior learning agreement had been done (p=0.035) resulting in increased student satisfaction. Time and workload constraints, organisational issues and peer support emerged as barriers to student learning. Students commented on difficulties in getting doctors as a DMP; and therefore suggested that learning experience can be enhanced if a qualified practicing Non Medical Prescriber could act as a "co-mentor". There were also suggestions of providing incentives to doctors and giving them more information about the role of NMP to encourage more doctors to act as DMP. Learning agreement and a time schedule with DMP at the beginning of the supervised period in practice significantly improved the students' learning experience, and was a major determinant of subsequent student satisfaction. Those who spent at least 30% of practice development time under direct supervision of their DMP were likely to be more satisfied with the learning process.

  18. 36 CFR 1226.12 - How do agencies disseminate approved schedules?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... distributed. (c) The submission must include the name, title, agency, address, and phone number of the... of the schedule. The directive must cite the legal authority (GRS or SF 115 and item numbers) for...

  19. 36 CFR 1226.12 - How do agencies disseminate approved schedules?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... distributed. (c) The submission must include the name, title, agency, address, and phone number of the... of the schedule. The directive must cite the legal authority (GRS or SF 115 and item numbers) for...

  20. 36 CFR 1226.12 - How do agencies disseminate approved schedules?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... distributed. (c) The submission must include the name, title, agency, address, and phone number of the... of the schedule. The directive must cite the legal authority (GRS or SF 115 and item numbers) for...

  1. 36 CFR 1226.12 - How do agencies disseminate approved schedules?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... distributed. (c) The submission must include the name, title, agency, address, and phone number of the... of the schedule. The directive must cite the legal authority (GRS or SF 115 and item numbers) for...

  2. 36 CFR § 1226.12 - How do agencies disseminate approved schedules?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... distributed. (c) The submission must include the name, title, agency, address, and phone number of the... of the schedule. The directive must cite the legal authority (GRS or SF 115 and item numbers) for...

  3. Differences in Characteristics of Aviation Accidents during 1993-2012 Based on Flight Purpose

    NASA Technical Reports Server (NTRS)

    Evans, Joni K.

    2016-01-01

    Usually aviation accidents are categorized and analyzed within flight conduct rules (Part 121, Part 135, Part 91) because differences in accident rates within flight rules have been demonstrated. Even within a particular flight rule the flights have different purposes. For many, Part 121 flights are synonymous with scheduled passenger transport, and indeed this is the largest group of Part 121 accidents. But there are also non-scheduled (charter) passenger transport and cargo flights. The primary purpose of the analysis reported here is to examine the differences in aviation accidents based on the purpose of the flight. Some of the factors examined are the accident severity, aircraft characteristics and accident occurrence categories. Twenty consecutive years of data were available and utilized to complete this analysis.

  4. Coordinating, Scheduling, Processing and Analyzing IYA09

    NASA Technical Reports Server (NTRS)

    Gipson, John; Behrend, Dirk; Gordon, David; Himwich, Ed; MacMillan, Dan; Titus, Mike; Corey, Brian

    2010-01-01

    The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

  5. Spiking neural network simulation: memory-optimal synaptic event scheduling.

    PubMed

    Stewart, Robert D; Gurney, Kevin N

    2011-06-01

    Spiking neural network simulations incorporating variable transmission delays require synaptic events to be scheduled prior to delivery. Conventional methods have memory requirements that scale with the total number of synapses in a network. We introduce novel scheduling algorithms for both discrete and continuous event delivery, where the memory requirement scales instead with the number of neurons. Superior algorithmic performance is demonstrated using large-scale, benchmarking network simulations.

  6. A meta-heuristic method for solving scheduling problem: crow search algorithm

    NASA Astrophysics Data System (ADS)

    Adhi, Antono; Santosa, Budi; Siswanto, Nurhadi

    2018-04-01

    Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

  7. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Farming. DATES: Written comments should be received on or before December 3, 2012 to be assured of... Loss From Farming. OMB Number: 1545-1976. Form Number: Schedule F, Part II and III (Form 1040... collection. Affected Public: Businesses and other for-profit organizations, Farming. Estimated Number of...

  8. Analysis of the safety profile of treatment with a large number of shock waves per session in extracorporeal lithotripsy.

    PubMed

    Budía Alba, A; López Acón, J D; Polo-Rodrigo, A; Bahílo-Mateu, P; Trassierra-Villa, M; Boronat-Tormo, F

    2015-06-01

    To assess the safety of increasing the number of waves per session in the treatment of urolithiasis using extracorporeal lithotripsy. Prospective, comparative, nonrandomized parallel study of patients with renoureteral lithiasis and an indication for extracorporeal lithotripsy who were consecutively enrolled between 2009 and 2010. We compared group I (160 patients) treated on schedule with a standard number of waves/session (mean 2858,3±302,8) using a Dornier lithotripter U/15/50 against group II (172 patients) treated with an expanded number of waves/session (mean, 6728,9±889,6) using a Siemens Modularis lithotripter. The study variables were age, sex, location, stone size, number of waves/session and total number of waves to resolution, stone-free rate (SFR) and rate of complications (Clavien-Dindo classification). Student's t-test and the chi-squared test were employed for the statistical analysis. The total rate of complications was 11.9% and 10.46% for groups I and II, respectively (P=.39). All complications were minor (Clavien-Dindo grade I). The most common complications were colic pain and hematuria in groups I and II, respectively, with a similar treatment intolerance rate (P>.05). The total number of waves necessary was lower in group II than in group I (P=.001), with SFRs of 96.5% and 71.5%, respectively (P=.001). Treatment with an expanded number of waves per session in extracorporeal lithotripsy does not increase the rate of complications or their severity. However, it could increase the overall effectiveness of the treatment. Copyright © 2014 AEU. Publicado por Elsevier España, S.L.U. All rights reserved.

  9. Pharmacologic management of non-cancer pain among nursing home residents.

    PubMed

    Lapane, Kate L; Quilliam, Brian J; Chow, Wing; Kim, Myoung S

    2013-01-01

    Pain is common in nursing home settings. To describe scheduled analgesic use among nursing home (NH) residents experiencing non-cancer pain and evaluate factors associated with scheduled analgesic use. We identified 2508 residents living in one of 185 NHs predominantly from one for-profit chain, with pain recorded on two consecutive Minimum Data Set assessments. Pharmacy transaction files provided detailed medication information. Logistic regression models adjusted for clustering of residents in NHs identified factors related to scheduled prescription analgesics. Twenty-three percent had no scheduled analgesics prescribed. Those with scheduled analgesics were more likely to have excruciating pain (5.5% vs. 1.2%) and moderate pain documented (64.7% vs. 47.5%) than residents without scheduled analgesics. Hydrocodone (41.7%), short-acting oxycodone (16.6%), and long-acting fentanyl (9.4%) were common, and 13.8% reported any nonsteroidal anti-inflammatory agent use. Factors associated with decreased odds of scheduled analgesics included severe cognitive impairment (adjusted odds ratio [AOR] 0.56; 95% confidence interval [CI] 0.36 to 0.88), age more than 85 years (AOR 0.57; 95% CI 0.41 to 0.80), and Parkinson's disease (AOR 0.55; 95% CI 0.30 to 0.99). Factors associated with increased odds of scheduled analgesic use included history of fracture (AOR 1.79; 95% CI 1.16 to 2.76), diabetes (AOR 1.30; 95% CI 1.02 to 1.66), and higher Minimum Data Set mood scores (AOR 1.11; 95% CI 1.04 to 1.19). Some improvements in pharmacologic management of pain in NHs have been realized. Yet, presence of pain without scheduled analgesics prescribed was still common. Evidence-based procedures to assure adherence to clinical practice guidelines for pain management in this setting are warranted. Copyright © 2013 U.S. Cancer Pain Relief Committee. Published by Elsevier Inc. All rights reserved.

  10. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  11. The effect of methylphenidate and rearing environment on behavioral inhibition in adult male rats.

    PubMed

    Hill, Jade C; Covarrubias, Pablo; Terry, Joel; Sanabria, Federico

    2012-01-01

    The ability to withhold reinforced responses-behavioral inhibition-is impaired in various psychiatric conditions including Attention Deficit Hyperactivity Disorder (ADHD). Methodological and analytical limitations have constrained our understanding of the effects of pharmacological and environmental factors on behavioral inhibition. To determine the effects of acute methylphenidate (MPH) administration and rearing conditions (isolated vs. pair-housed) on behavioral inhibition in adult rats. Inhibitory capacity was evaluated using two response-withholding tasks, differential reinforcement of low rates (DRL) and fixed minimum interval (FMI) schedules of reinforcement. Both tasks made sugar pellets contingent on intervals longer than 6 s between consecutive responses. Inferences on inhibitory and timing capacities were drawn from the distribution of withholding times (interresponse times, or IRTs). MPH increased the number of intervals produced in both tasks. Estimates of behavioral inhibition increased with MPH dose in FMI and with social isolation in DRL. Nonetheless, burst responding in DRL and the divergence of DRL data relative to past studies, among other limitations, undermined the reliability of DRL data as the basis for inferences on behavioral inhibition. Inhibitory capacity was more precisely estimated from FMI than from DRL performance. Based on FMI data, MPH, but not a socially enriched environment, appears to improve inhibitory capacity. The highest dose of MPH tested, 8 mg/kg, did not reduce inhibitory capacity but reduced the responsiveness to waiting contingencies. These results support the use of the FMI schedule, complemented with appropriate analytic techniques, for the assessment of behavioral inhibition in animal models.

  12. Technology Acceptance and Adoption of Innovative Smartphone Uses among Hospital Employees

    PubMed Central

    Moon, Byung Chan

    2014-01-01

    Objectives The number of healthcare institutions adopting smartphones continues to increase, implying that their utilization is undoubtedly gaining attention. Understanding the needs of smartphone users will provide a greater opportunity for successful information technology acceptance by expanding the scope of its utilization. This study focuses on how smartphones are accepted and utilized in hospitals and analyzes the factors influencing users' attitude, social influence, and intention of use. Methods For the study model, the researcher has mainly adopted the Theory of Reasoned Action and further modified and used the models of Technology Acceptance and Information Systems Success. To test the model empirically, a survey was conducted with 122 professionals on information development teams in Korean tertiary hospitals. Results The common smartphone usage modes were Internet searching, e-mail, scheduling, and social networking in consecutive order. Phone calls consisted of 51.4% of work-related purposes, while other functions, such as text message, Web browser, and scheduling, were mostly used for personal purposes. Costs, contents quality, innovation, ease of use, and support were shown to have statistically significant effects on user attitude, and social influence, portability, security, content quality, and innovation were significant. User attitude and social influence were both statistically significant with respect to intention of use, with user attitude greater than social influence. Conclusions The participating staff were analyzed as having strong personal faith and principles, independent from their external environment. Timely information exchanges among medical staff will facilitate appropriate communication and improved health services to patients in need. PMID:25405067

  13. Technology Acceptance and Adoption of Innovative Smartphone Uses among Hospital Employees.

    PubMed

    Moon, Byung Chan; Chang, Hyejung

    2014-10-01

    The number of healthcare institutions adopting smartphones continues to increase, implying that their utilization is undoubtedly gaining attention. Understanding the needs of smartphone users will provide a greater opportunity for successful information technology acceptance by expanding the scope of its utilization. This study focuses on how smartphones are accepted and utilized in hospitals and analyzes the factors influencing users' attitude, social influence, and intention of use. For the study model, the researcher has mainly adopted the Theory of Reasoned Action and further modified and used the models of Technology Acceptance and Information Systems Success. To test the model empirically, a survey was conducted with 122 professionals on information development teams in Korean tertiary hospitals. The common smartphone usage modes were Internet searching, e-mail, scheduling, and social networking in consecutive order. Phone calls consisted of 51.4% of work-related purposes, while other functions, such as text message, Web browser, and scheduling, were mostly used for personal purposes. Costs, contents quality, innovation, ease of use, and support were shown to have statistically significant effects on user attitude, and social influence, portability, security, content quality, and innovation were significant. User attitude and social influence were both statistically significant with respect to intention of use, with user attitude greater than social influence. The participating staff were analyzed as having strong personal faith and principles, independent from their external environment. Timely information exchanges among medical staff will facilitate appropriate communication and improved health services to patients in need.

  14. Nutritional risk and gastrointestinal dysautonomia symptoms in Parkinson's disease outpatients hospitalised on a scheduled basis.

    PubMed

    Barichella, Michela; Cereda, Emanuele; Madio, Carmen; Iorio, Laura; Pusani, Chiara; Cancello, Raffaella; Caccialanza, Riccardo; Pezzoli, Gianni; Cassani, Erica

    2013-07-28

    Dysautonomia symptoms of nutritional interest may often occur in Parkinson's disease (PD), but the role played in affecting the risk of malnutrition still needs to be clarified. A total of 208 consecutive PD outpatients hospitalised on a scheduled basis were assessed for nutritional risk by the Malnutrition Universal Screening Tool. Presence of dysautonomia symptoms (dysphagia, sialorrhoea and constipation) was investigated using clinical rating scales. In our population, prevalence of nutritional risk was 17·2 (95 % CI 12·1, 24·0) % and relied mainly on unintentional weight loss. Sialorrhoea, dysphagia, dysphagia to liquids and constipation were observed in 10·6, 11·0, 14·4 and 59·6 % of the patients, respectively. Nutritional risk was independently associated with the number of dysautonomia symptoms (OR 1·39 (95 % CI 1·00, 1·96); P= 0·048) but not with single symptoms. An independent association was also found with the severity of motor symptoms (Hoehn-Yahr stage, OR 1·48 (95 % CI 1·00, 2·55); P= 0·049) and levodopa dose (OR 1·16 (95 % CI 1·04, 1·31) mg/kg per d; P= 0·009). Nutritional risk in PD outpatients appears to depend mainly on dysautonomic syndrome, disease severity and levodopa dosage. Implications for outcome deserve further investigation. The assessment of nutritional status and of gastrointestinal dysautonomia symptoms should be part of the routine work-up of a PD patient.

  15. Effectiveness of motor sequential learning according to practice schedules in healthy adults; distributed practice versus massed practice

    PubMed Central

    Kwon, Yong Hyun; Kwon, Jung Won; Lee, Myoung Hee

    2015-01-01

    [Purpose] The purpose of the current study was to compare the effectiveness of motor sequential learning according to two different types of practice schedules, distributed practice schedule (two 12-hour inter-trial intervals) and massed practice schedule (two 10-minute inter-trial intervals) using a serial reaction time (SRT) task. [Subjects and Methods] Thirty healthy subjects were recruited and then randomly and evenly assigned to either the distributed practice group or the massed practice group. All subjects performed three consecutive sessions of the SRT task following one of the two different types of practice schedules. Distributed practice was scheduled for two 12-hour inter-session intervals including sleeping time, whereas massed practice was administered for two 10-minute inter-session intervals. Response time (RT) and response accuracy (RA) were measured in at pre-test, mid-test, and post-test. [Results] For RT, univariate analysis demonstrated significant main effects in the within-group comparison of the three tests as well as the interaction effect of two groups × three tests, whereas the between-group comparison showed no significant effect. The results for RA showed no significant differences in neither the between-group comparison nor the interaction effect of two groups × three tests, whereas the within-group comparison of the three tests showed a significant main effect. [Conclusion] Distributed practice led to enhancement of motor skill acquisition at the first inter-session interval as well as at the second inter-interval the following day, compared to massed practice. Consequentially, the results of this study suggest that a distributed practice schedule can enhance the effectiveness of motor sequential learning in 1-day learning as well as for two days learning formats compared to massed practice. PMID:25931727

  16. Proceedings of the Expert Systems Workshop Held in Pacific Grove, California on 16-18 April 1986

    DTIC Science & Technology

    1986-04-18

    13- NUMBER OF PAGES 197 N IS. SECURITY CLASS, (ol Mm raport) UNCLASSIFIED I5a. DECLASSIFI CATION/DOWNGRADING SCHEDULE 16. DISTRIBUTION...are distributed and parallel. * - Features unimplemented at present; scheduled for phase 2. Table 1-1: Key design characteristics of ABE 2. a...data structuring techniques and a semi- deterministic scheduler . A program for the DF framework consists of a number of independent processing modules

  17. Generating Variable and Random Schedules of Reinforcement Using Microsoft Excel Macros

    ERIC Educational Resources Information Center

    Bancroft, Stacie L.; Bourret, Jason C.

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time.…

  18. 78 FR 44191 - Proposed Collection of Information: Annual Financial Statement of Surety Companies-Schedule F

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... Statement of Surety Companies--Schedule F AGENCY: Bureau of the Fiscal Service, Fiscal Service, Treasury... of Surety Companies--Schedule F.'' DATES: Written comments should be received on or before September... described below: Title: Annual Financial Statement of Surety Companies--Schedule F. OMB Number: 1510-0012...

  19. A mathematical model for evaluating the impact of vaccination schedules: application to Neisseria meningitidis.

    PubMed

    Tuckwell, H C; Hanslik, T; Valleron, A J; Flahault, A

    2003-06-01

    A mathematical model is described which determines the impact of a schedule of vaccination on the time course of a certain class of diseases. The data are the demographic variables and parameters and age-dependent non-fatal and fatal case rates. Given the age- and time-dependent rates of vaccination including coverage and corresponding efficacies, various schedules may be distinguished by either the absolute numbers of cases and deaths avoided or the numbers of cases and deaths avoided per dose of vaccine. The model was applied to meningo-coccal serogroup C disease in France. The outcomes of six different vaccination schedules were examined. In absolute terms, a schedule in which all individuals aged between 2 and 20 years were vaccinated performed best, but this schedule and that in which only 1-year olds were vaccinated performed equally and best in terms of cases prevented, but not lives saved, per dose.

  20. Generating variable and random schedules of reinforcement using Microsoft Excel macros.

    PubMed

    Bancroft, Stacie L; Bourret, Jason C

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time. Generating schedule values for variable and random reinforcement schedules can be difficult. The present article describes the steps necessary to write macros in Microsoft Excel that will generate variable-ratio, variable-interval, variable-time, random-ratio, random-interval, and random-time reinforcement schedule values.

  1. Scheduling in the context of resident duty hour reform

    PubMed Central

    2014-01-01

    Fuelled by concerns about resident health and patient safety, there is a general trend in many jurisdictions toward limiting the maximum duration of consecutive work to between 14 and 16 hours. The goal of this article is to assist institutions and residency programs to make a smooth transition from the previous 24- to 36-hour call system to this new model. We will first give an overview of the main types of coverage systems and their relative merits when considering various aspects of patient care and resident pedagogy. We will then suggest a practical step-by-step approach to designing, implementing, and monitoring a scheduling system centred on clinical and educational needs in the context of resident duty hour reform. The importance of understanding the impetus for change and of assessing the need for overall workflow restructuring will be explored throughout this process. Finally, as a practical example, we will describe a large, university-based teaching hospital network’s transition from a traditional call-based system to a novel schedule that incorporates the new 16-hour duty limit. PMID:25561221

  2. ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP640). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111683. ALTERNATE ID NUMBER 8952-CPP-640-A-6. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  3. 75 FR 73119 - Proposed Information Collection; OMB Control Number 1018-0102; Applications for Special Use...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... possible on some refuges. Group visits and other one-time events. (2) FWS Form 3-XXXX (Commercial Special... number or Social Security Number (FWS Form 3-XXXX). Whether or not an applicant or subpermittee has been... provide details and court action taken (FWS Form 3-XXXX). Trip schedule(s). Curriculum Vitae or resume of...

  4. New Kids on the Block Schedule: Beginning Teachers Face Challenges

    ERIC Educational Resources Information Center

    Zepeda, Sally J.; Mayers, R. Stewart

    2001-01-01

    Across the United States, an ever-increasing number of high schools have reevaluated their use of instructional time and have adopted some form of a block schedule. Block scheduling, an innovation grounded in Trump's Flexible Modular Scheduling Design, reorganizes the school day into extended blocks of time, each approximately 70 to 90 minutes.…

  5. What is the preferred number of consecutive night shifts? results from a crossover intervention study among police officers in Denmark.

    PubMed

    Nabe-Nielsen, Kirsten; Jensen, Marie Aarrebo; Hansen, Åse Marie; Kristiansen, Jesper; Garde, Anne Helene

    2016-10-01

    Among police officers in Denmark, we studied (i) how many consecutive night shifts participants preferred at baseline; (ii) preferences regarding three intervention conditions (two, four, and seven consecutive night shifts followed by the same number of days off/day shifts: '2 + 2', '4 + 4', '7 + 7') at follow-up; (iii) characteristics of participants preferring each of these intervention conditions. Questionnaire data from a crossover intervention study were used (baseline: n = 73; follow-up: n = 68). At baseline, 49% preferred four consecutive night shifts. At follow-up, 57% preferred '4 + 4', 26% preferred '2 + 2' and 26% preferred '7 + 7'. Participants, who preferred longer spells of night work experienced that night work was less demanding, found it easier to sleep at different times of the day, and were more frequently evening types compared with participants who preferred shorter spells of night work. The participants' preferences are likely to be influenced by their previous shift work experience. Practitioner Summary: We investigated police officers' preferences regarding the number of consecutive night shifts. The majority preferred four consecutive night shifts. Those who preferred the longer spells of night work found night work less demanding, found it easier to sleep at different times of the day, and were more frequently evening types.

  6. Design of an Aircrew Scheduling Decision Aid for the 6916th Electronic Security Squadron.

    DTIC Science & Technology

    1987-06-01

    Security Classification) Design of an Aircrew Scheduling Decision Aid for the 6916th Electronic Security Squadron 12. PERSONAL AUTHOR(S) Thomas J. Kopf...Because of the great number of possible scheduling alternatives, it is difficult to find an optimal solution to-the scheduling problem. Additionally...changes to the original schedule make it even more difficult to find an optimal solution. The emergence of capable microcompu- ters, decision support

  7. Strategies GeoCape Intelligent Observation Studies @ GSFC

    NASA Technical Reports Server (NTRS)

    Cappelaere, Pat; Frye, Stu; Moe, Karen; Mandl, Dan; LeMoigne, Jacqueline; Flatley, Tom; Geist, Alessandro

    2015-01-01

    This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.

  8. Undesirable Choice Biases with Small Differences in the Spatial Structure of Chance Stimulus Sequences.

    PubMed

    Herrera, David; Treviño, Mario

    2015-01-01

    In two-alternative discrimination tasks, experimenters usually randomize the location of the rewarded stimulus so that systematic behavior with respect to irrelevant stimuli can only produce chance performance on the learning curves. One way to achieve this is to use random numbers derived from a discrete binomial distribution to create a 'full random training schedule' (FRS). When using FRS, however, sporadic but long laterally-biased training sequences occur by chance and such 'input biases' are thought to promote the generation of laterally-biased choices (i.e., 'output biases'). As an alternative, a 'Gellerman-like training schedule' (GLS) can be used. It removes most input biases by prohibiting the reward from appearing on the same location for more than three consecutive trials. The sequence of past rewards obtained from choosing a particular discriminative stimulus influences the probability of choosing that same stimulus on subsequent trials. Assuming that the long-term average ratio of choices matches the long-term average ratio of reinforcers, we hypothesized that a reduced amount of input biases in GLS compared to FRS should lead to a reduced production of output biases. We compared the choice patterns produced by a 'Rational Decision Maker' (RDM) in response to computer-generated FRS and GLS training sequences. To create a virtual RDM, we implemented an algorithm that generated choices based on past rewards. Our simulations revealed that, although the GLS presented fewer input biases than the FRS, the virtual RDM produced more output biases with GLS than with FRS under a variety of test conditions. Our results reveal that the statistical and temporal properties of training sequences interacted with the RDM to influence the production of output biases. Thus, discrete changes in the training paradigms did not translate linearly into modifications in the pattern of choices generated by a RDM. Virtual RDMs could be further employed to guide the selection of proper training schedules for perceptual decision-making studies.

  9. Generating Variable and Random Schedules of Reinforcement Using Microsoft Excel Macros

    PubMed Central

    Bancroft, Stacie L; Bourret, Jason C

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time. Generating schedule values for variable and random reinforcement schedules can be difficult. The present article describes the steps necessary to write macros in Microsoft Excel that will generate variable-ratio, variable-interval, variable-time, random-ratio, random-interval, and random-time reinforcement schedule values. PMID:18595286

  10. Adaption of the temporal correlation coefficient calculation for temporal networks (applied to a real-world pig trade network).

    PubMed

    Büttner, Kathrin; Salau, Jennifer; Krieter, Joachim

    2016-01-01

    The average topological overlap of two graphs of two consecutive time steps measures the amount of changes in the edge configuration between the two snapshots. This value has to be zero if the edge configuration changes completely and one if the two consecutive graphs are identical. Current methods depend on the number of nodes in the network or on the maximal number of connected nodes in the consecutive time steps. In the first case, this methodology breaks down if there are nodes with no edges. In the second case, it fails if the maximal number of active nodes is larger than the maximal number of connected nodes. In the following, an adaption of the calculation of the temporal correlation coefficient and of the topological overlap of the graph between two consecutive time steps is presented, which shows the expected behaviour mentioned above. The newly proposed adaption uses the maximal number of active nodes, i.e. the number of nodes with at least one edge, for the calculation of the topological overlap. The three methods were compared with the help of vivid example networks to reveal the differences between the proposed notations. Furthermore, these three calculation methods were applied to a real-world network of animal movements in order to detect influences of the network structure on the outcome of the different methods.

  11. Critical analysis of consecutive unilateral cleft lip repairs: determining ideal sample size.

    PubMed

    Power, Stephanie M; Matic, Damir B

    2013-03-01

    Objective : Cleft surgeons often show 10 consecutive lip repairs to reduce presentation bias, however the validity remains unknown. The purpose of this study is to determine the number of consecutive cases that represent average outcomes. Secondary objectives are to determine if outcomes correlate with cleft severity and to calculate interrater reliability. Design : Consecutive preoperative and 2-year postoperative photographs of the unilateral cleft lip-nose complex were randomized and evaluated by cleft surgeons. Parametric analysis was performed according to chronologic, consecutive order. The mean standard deviation over all raters enabled calculation of expected 95% confidence intervals around a mean tested for various sample sizes. Setting : Meeting of the American Cleft Palate-Craniofacial Association in 2009. Patients, Participants : Ten senior cleft surgeons evaluated 39 consecutive lip repairs. Main Outcome Measures : Preoperative severity and postoperative outcomes were evaluated using descriptive and quantitative scales. Results : Intraclass correlation coefficients for cleft severity and postoperative evaluations were 0.65 and 0.21, respectively. Outcomes did not correlate with cleft severity (P  =  .28). Calculations for 10 consecutive cases demonstrated wide 95% confidence intervals, spanning two points on both postoperative grading scales. Ninety-five percent confidence intervals narrowed within one qualitative grade (±0.30) and one point (±0.50) on the 10-point scale for 27 consecutive cases. Conclusions : Larger numbers of consecutive cases (n > 27) are increasingly representative of average results, but less practical in presentation format. Ten consecutive cases lack statistical support. Cleft surgeons showed low interrater reliability for postoperative assessments, which may reflect personal bias when evaluating another surgeon's results.

  12. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  13. 5 CFR 610.406 - Holiday for employees on compressed work schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... number of hours of the compressed work schedule on that day. (b) If a part-time employee is relieved or... of the compressed work schedule on that day. When a holiday falls on a nonworkday of a part-time... work schedules. (a) If a full-time employee is relieved or prevented from working on a day designated...

  14. Hospital Stay and Engagement in Outpatient Follow-Up After Alcohol Emergency Detox: A 1-Year Comparison Study.

    PubMed

    Azuar, Julien; Questel, Frank; Hispard, Eric; Scott, Jan; Vorspan, Florence; Bellivier, Frank

    2016-02-01

    Inpatient alcohol detoxifications are only proposed after motivational outpatient encounters because detoxification directly from the emergency department (ED) is believed to be associated with early dropout and poor adherence to outpatient follow-up. The aim of this prospective follow-up study was to test the feasibility of unscheduled (UP) alcohol detoxification directly from the ED and to compare the 1-year follow-up of these patients to that of scheduled (SP) patients. A quasi-naturalistic prospective follow-up study of 120 patients: 60 consecutively admitted patients referred directly by the ED for alcohol detoxification (UP) were compared to 60 consecutively admitted patients who had undergone the usual preparation for an inpatient detoxification program (SP). The length of hospitalization (in days) and attendance to postdischarge outpatient visits during the first year was compared. UP patients were older, less frequently employed, and had more somatic comorbidities compared with SP patients. The UP length of stay was significantly longer (20 ± 16 vs. 14 ± 6, p = 0.04). No difference in their postdischarge attendance was observed; the number of patients attending 1 session (57% UP vs. 65% SP, p = 0.227) and 5 sessions (22% UP vs. 32% SP, p = 0.151) and the mean number of postdischarge visits attended were comparable between the UP and SP groups (2.7 ± 6 vs. 4.5 ± 6; Mann-Whitney U = 1,517, p = 0.124). We did not find that UP patients who had been admitted for alcohol detoxification had a significantly higher dropout rate or lower postdischarge addiction treatment attendance. Because they may have several advantages, detoxification programs directly linked with EDs should be further evaluated. Copyright © 2016 by the Research Society on Alcoholism.

  15. Graph Coloring Used to Model Traffic Lights.

    ERIC Educational Resources Information Center

    Williams, John

    1992-01-01

    Two scheduling problems, one involving setting up an examination schedule and the other describing traffic light problems, are modeled as colorings of graphs consisting of a set of vertices and edges. The chromatic number, the least number of colors necessary for coloring a graph, is employed in the solutions. (MDH)

  16. LOFT. Containment and service building (TAN650). Room number schedule, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOFT. Containment and service building (TAN-650). Room number schedule, sheet 2 of 2. Kaiser engineers 6413-11-STEP/LOFT-650-A-XX. Date: October 1969. INEEL index code no. 036-650-00-486-122228 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  17. Constraining response output on conjunctive fixed-ratio 1 fixed-time reinforcement schedules: Effects on the postreinforcement pause.

    PubMed

    Lopez, F; Pereira, C

    1985-03-01

    Two experiments used response-restriction procedures in order to test the independence of the factors determining response rate and the factors determining the size of the postreinforcement pause on interval schedules. Responding was restricted by response-produced blackout or by retracting the lever. In Experiment 1 with a Conjunctive FR 1 FT schedule, the blackout procedure reduced the postreinforcement pause more than the lever-retraction procedure did, and both procedures produced shorter pauses than did the schedule without response restriction. In Experiment 2 the interreinforcement interval was also manipulated, and the size of the pause was an increasing function of the interreinforcement interval, but the rate of increase was lower than that produced by fixed interval schedules of comparable interval durations. The assumption of functional independence of the postreinforcement pause and terminal rate in fixed interval schedules is questioned since data suggest that pause reductions resulted from constraining variation in response number compared to equivalent periodic schedules in which response number was allowed to vary. Copyright © 1985. Published by Elsevier B.V.

  18. Choices between positive and negative reinforcement during treatment for escape-maintained behavior.

    PubMed

    DeLeon, I G; Neidert, P L; Anders, B M; Rodriguez-Catter, V

    2001-01-01

    Positive reinforcement was more effective than negative reinforcement in promoting compliance and reducing escape-maintained problem behavior for a child with autism. Escape extinction was then added while the child was given a choice between positive or negative reinforcement for compliance and the reinforcement schedule was thinned. When the reinforcement requirement reached 10 consecutive tasks, the treatment effects became inconsistent and reinforcer selection shifted from a strong preference for positive reinforcement to an unstable selection pattern.

  19. Contributions au probleme d'affectation des types d'avion

    NASA Astrophysics Data System (ADS)

    Belanger, Nicolas

    In this thesis, we approach the problem of assigning aircraft types to flights (what is called aircraft fleet assignment) in a strategic planning context. The literature mentions many studies considering this problem on a daily flight schedule basis, but the proposed models do no allow to consider many elements that are either necessary to assure the practical feasibility of the solutions, or relevant to get more beneficial solutions. After describing the practical context of the problem (Chapter 1) and presenting the literature on the subject (Chapter 2), we propose new models and solution approaches to improve the quality of' the solutions obtained. The general scheme of the thesis is presented in Chapter 3. We summarize here the models and solution approaches that we propose; and present the main elements of our conclusions. First, in Chapter 4, we consider the problem of aircraft fleet Assignment over a weekly flight schedule, integrating into the objective an homogeneity factor for driving the choice of the aircraft types for the flights with the same flight number over the week. We present an integer linear model based on a time-space multicommodity network. This model includes, among others, decision variables relative to the aircraft type assigned to each flight and to the dominant aircraft type assigned to each flight number. We present in Chapter 5 the results of a research project made in collaboration with Air Canada within a consulting contract. The project aimed at analyzing the relevance for the planners of using an optimization software to help them to first identify non profitable flight legs in the network, and second to efficiently establish the aircraft fleet assignment. In this chapter, we propose an iterative approach to take into account the fact that the passenger demand is not known on a leg basis, but rather on an origin-destination and departure time basis. Finally, in Chapter 6, we propose a model and a solution approach that aim at solving the fleet assignment problem over a periodic schedule in the case where there is a flexibility on the flight departure times and the fleet size must be minimized. Moreover, the objective of this model includes the impact on the passenger demand for each flight of the variation of the flight departure times and the closing of the departure times of consecutive flights connecting the same pairs of stations. (Abstract shortened by UMI.)

  20. Separating the effects of interreinforcement time and number of interreinforcement responses1

    PubMed Central

    Neuringer, Allen J.; Schneider, Bruce A.

    1968-01-01

    The relative importance of interreinforcement time and interreinforcement responses was evaluated by varying each independently. To do this, a blackout was presented after each nonreinforced response under both fixed-ratio and fixed-interval schedules of reinforcement. Manipulating the blackout duration under the fixed-ratio schedule caused interreinforcement time to vary without affecting the number of interreinforcement responses. Pigeons' post-reinforcement and post-blackout response latencies were found to increase linearly with interreinforcement time. Under the fixed-interval schedule, the same blackout manipulations changed the number of interreinforcement responses without affecting interreinforcement time. Post-reinforcement and post-blackout response latencies under this condition were approximately constant. These results suggest that responding is controlled by interreinforcement time and is not influenced by the number of responses emitted between reinforcements. PMID:16811313

  1. Sleep and Fatigue Differences in the Two Most Common Types of Commercial Flight Operations.

    PubMed

    Reis, Cátia; Mestre, Catarina; Canhão, Helena; Gradwell, David; Paiva, Teresa

    2016-09-01

    Sleep and fatigue management is one of the main challenges in airline operations scheduling. Our aim was to compare the differences regarding fatigue, sleep, and labor specificities between the two most common types of flight, short/medium haul (SM-H) and long haul (L-H), in a large sample of airline pilots. A self-report questionnaire was developed, composed of socio-economic and labor questions, and psychological assessment scales for fatigue and sleep. Associations of these variables and type of flight were tested. Of the total sample of Portuguese airline pilots (N = 435), 313 (72%) were from SM-H and 122 (28%) were from L-H. For SM-H, the values obtained for sleep complaints were 34.2%, daytime sleepiness 61.6%, and fatigue 93.0%. For L-H, 36.9%, 53.3%, and 84.4%, respectively. Looking at labor variables, the differences between the two types of flights were evident, with SM-H pilots' having statistically significant higher mean values of duty and flight hours, numbers of sectors, and early mornings. Only the mean number of night periods was higher in L-H pilots. All values were reported for 28 consecutive scheduling days. Night periods and time-zone crossing may explain higher prevalence levels of sleep disturbances in L-H pilots. However, the values for daytime sleepiness were higher in SM-H pilots, which may be attributed to diminished sleep caused by a combination of frequent early starts and long duty periods. Taking into account the large differences between the two types of flights, different regulatory limits should be considered by aviation authorities. Reis C, Mestre C, Canhão H, Gradwell D, Paiva T. Sleep and fatigue differences in the two most common types of commercial flight operations. Aerosp Med Hum Perform. 2016; 87(9):811-815.

  2. Mechanisms of breast cancer risk in shift workers: association of telomere shortening with the duration and intensity of night work.

    PubMed

    Samulin Erdem, Johanna; Notø, Heidi Ødegaard; Skare, Øivind; Lie, Jenny-Anne S; Petersen-Øverleir, Marte; Reszka, Edyta; Pepłońska, Beata; Zienolddiny, Shanbeh

    2017-08-01

    Occupational factors such as shiftwork and especially night work that involves disruption of the circadian rhythm may contribute to increased breast cancer risk. Circadian disruption may also affect telomere length (TL). While short TL generally is associated with increased cancer risk, its association with breast cancer risk is inconclusive. We suggest that working schedules might be an important factor in assessment of effects of TL on breast cancer risk. Moreover, telomere shortening might be a potential mechanism for night work-related breast cancer. In this study, effects of shift work on TL and its association with breast cancer risk were investigated in a nested breast cancer case-control study of Norwegian nurses. TL was assessed by qPCR in DNA from 563 breast cancer patients and 619 controls. Here, we demonstrate that TL is affected by intensive night work schedules, as work with six consecutive night for a period of more than 5 years was associated with decreased telomere lengths (-3.18, 95% CI: -6.46 to -0.58, P = 0.016). Furthermore, telomere shortening is associated with increased breast cancer risk in workers with long periods of consecutive night shifts. Thus, nurses with longer telomere lengths had a lower risk for breast cancer if they had worked more than four (OR: 0.37, 95% CI: 0.16-0.79, P = 0.014) or five (OR: 0.31, 95% CI: 0.10-0.83, P = 0.029) consecutive night shifts for a period of 5 years or more. These data suggest that telomere shortening is associated with the duration and intensity of night work and may be a contributing factor for breast cancer risk among female shift workers. © 2017 The Authors. Cancer Medicine published by John Wiley & Sons Ltd.

  3. Multidimensional Filtering Investigations.

    DTIC Science & Technology

    1987-02-01

    organization , please notify RADC (DCCD) Griffis. An NY 13441-5700. This will assist us in main- taming a current mailing list. Do not return copies of...OF REPORT N/A Approved for public release; distribution Zb. DECLASSIFICATION/IDOWNGRADING SCHEDUL.E unlimited. MIA 4. PERFORMING ORGANIZATION REPORT...NUMBER(S) S. MONITORING ORGANIZATION REPORT NUMBER(S) N/A ADC-TR-86-231 Ge. NAME OF PERFORMING ORGANIZATION 6Gb. OFFICE SYMBOL 7a. NAME OF MONITORING

  4. 5 CFR 630.1203 - Leave entitlement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... scheduled administrative workweek. If the number of hours in an employee's workweek varies from week to week, a weekly average of the hours scheduled over the 12 weeks prior to the date leave commences shall be... the 12-week entitlement to family and medical leave. (f) If the number of hours in an employee's...

  5. Detection of feline coronavirus in cheetah (Acinonyx jubatus) feces by reverse transcription-nested polymerase chain reaction in cheetahs with variable frequency of viral shedding.

    PubMed

    Gaffney, Patricia M; Kennedy, Melissa; Terio, Karen; Gardner, Ian; Lothamer, Chad; Coleman, Kathleen; Munson, Linda

    2012-12-01

    Cheetahs (Acinonyx jubatus) are a highly threatened species because of habitat loss, human conflict, and high prevalence of disease in captivity. An epidemic of feline infectious peritonitis and concern for spread of infectious disease resulted in decreased movement of cheetahs between U.S. zoological facilities for managed captive breeding. Identifying the true feline coronavirus (FCoV) infection status of cheetahs is challenging because of inconsistent correlation between seropositivity and fecal viral shedding. Because the pattern of fecal shedding of FCoV is unknown in cheetahs, this study aimed to assess the frequency of detectable fecal viral shedding in a 30-day period and to determine the most efficient fecal sampling strategy to identify cheetahs shedding FCoV. Fecal samples were collected from 16 cheetahs housed at seven zoological facilities for 30 to 46 consecutive days; the samples were evaluated for the presence of FCoV by reverse transcription-nested polymerase chain reaction (RT-nPCR). Forty-four percent (7/16) of cheetahs had detectable FCoV in feces, and the proportion of positive samples for individual animals ranged from 13 to 93%. Cheetahs shed virus persistently, intermittently, or rarely over 30-46 days. Fecal RT-nPCR results were used to calculate the probability of correctly identifying a cheetah known to shed virus given multiple hypothetical fecal collection schedules. The most efficient hypothetical fecal sample collection schedule was evaluation of five individual consecutive fecal samples, resulting in a 90% probability of identifying a known shedder. Demographic and management risk factors were not significantly associated (P < or = 0.05) with fecal viral shedding. Because some cheetahs shed virus intermittently to rarely, fecal sampling schedules meant to identify all known shedders would be impractical with current tests and eradication of virus from the population unreasonable. Managing the captive population as endemically infected with FCoV may be a more feasible approach.

  6. Challenges in management of patients with intracranial germ cell tumor and diabetes insipidus treated with cisplatin and/or ifosfamide based chemotherapy.

    PubMed

    Afzal, Samina; Wherrett, Diane; Bartels, Ute; Tabori, Uri; Huang, Annie; Stephens, Derek; Bouffet, Eric

    2010-05-01

    Patients with intracranial germ cell tumor (IGCT) often present with pituitary dysfunction, including diabetes insipidus (DI). Recent protocols have used pre-radiation chemotherapy with combinations of etoposide, carboplatin and/or cisplatin, and ifosfamide. Management of DI in these patients requires monitoring of electrolytes and fluids during chemotherapy and hyperhydration. All consecutive patients treated with chemotherapy for an IGCT during the period 1990-2007 at the Hospital for Sick Children, Toronto were reviewed. Out of 32 patients who received chemotherapy, 21 had DI. Only cycles containing cisplatin and/or ifosfamide and hyperhydration were considered. DI and non-DI patients were compared for each cycle of chemotherapy. Patients were studied for number of days in hospital per chemotherapy course, daily fluid input and output, changes in dose, schedule and route of administration of desmopressin (DDAVP) during chemotherapy, daily variations in sodium level, electrolyte monitoring requirements per day, and complications related to fluid and electrolyte disturbances. Fifty-four cycles of chemotherapy in DI patients were compared to 25 cycles in non DI patients. All 21 patients with DI required daily change in dosage and schedule of DDAVP. Marked variations in daily sodium level were observed in the DI group. Seventeen courses required prolonged admission in the DI group (one in non DI patients) and 6 patients experienced serious complications. In conclusion, DI is a risk factor for complications when cisplatin and/or ifosfamide based protocols are used. The role of these agents in the management of ICGT should be carefully evaluated and guidelines for management of DI established.

  7. The influence of different training schedules on the learning of psychomotor skills for endoscopic surgery.

    PubMed

    Verdaasdonk, E G G; Stassen, L P S; van Wijk, R P J; Dankelman, J

    2007-02-01

    Psychomotor skills for endoscopic surgery can be trained with virtual reality simulators. Distributed training is more effective than massed training, but it is unclear whether distributed training over several days is more effective than distributed training within 1 day. This study aimed to determine which of these two options is the most effective for training endoscopic psychomotor skills. Students with no endoscopic experience were randomly assigned either to distributed training on 3 consecutive days (group A, n = 10) or distributed training within 1 day (group B, n = 10). For this study the SIMENDO virtual reality simulator for endoscopic skills was used. The training involved 12 repetitions of three different exercises (drop balls, needle manipulation, 30 degree endoscope) in differently distributed training schedules. All the participants performed a posttraining test (posttest) for the trained tasks 7 days after the training. The parameters measured were time, nontarget environment collisions, and instrument path length. There were no significant differences between the groups in the first training session for all the parameters. In the posttest, group A (training over several days) performed 18.7% faster than group B (training on 1 day) (p = 0.013). The collision and path length scores for group A did not differ significantly from the scores for group B. The distributed group trained over several days was faster, with the same number of errors and the same instrument path length used. Psychomotor skill training for endoscopic surgery distributed over several days is superior to training on 1 day.

  8. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  9. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  10. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  11. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  12. 5 CFR 630.1202 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...(n). An employee who must be absent from work to receive medical treatment for a serious health... relationship is not necessary. Incapacity means the inability to work, attend school, or perform other regular....” Reduced leave schedule means a work schedule under which the usual number of hours of regularly scheduled...

  13. 5 CFR 630.1202 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...(n). An employee who must be absent from work to receive medical treatment for a serious health... relationship is not necessary. Incapacity means the inability to work, attend school, or perform other regular....” Reduced leave schedule means a work schedule under which the usual number of hours of regularly scheduled...

  14. 5 CFR 630.1202 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...(n). An employee who must be absent from work to receive medical treatment for a serious health... relationship is not necessary. Incapacity means the inability to work, attend school, or perform other regular....” Reduced leave schedule means a work schedule under which the usual number of hours of regularly scheduled...

  15. Constraint monitoring in TOSCA

    NASA Technical Reports Server (NTRS)

    Beck, Howard

    1992-01-01

    The Job-Shop Scheduling Problem (JSSP) deals with the allocation of resources over time to factory operations. Allocations are subject to various constraints (e.g., production precedence relationships, factory capacity constraints, and limits on the allowable number of machine setups) which must be satisfied for a schedule to be valid. The identification of constraint violations and the monitoring of constraint threats plays a vital role in schedule generation in terms of the following: (1) directing the scheduling process; and (2) informing scheduling decisions. This paper describes a general mechanism for identifying constraint violations and monitoring threats to the satisfaction of constraints throughout schedule generation.

  16. Subrandom methods for multidimensional nonuniform sampling.

    PubMed

    Worley, Bradley

    2016-08-01

    Methods of nonuniform sampling that utilize pseudorandom number sequences to select points from a weighted Nyquist grid are commonplace in biomolecular NMR studies, due to the beneficial incoherence introduced by pseudorandom sampling. However, these methods require the specification of a non-arbitrary seed number in order to initialize a pseudorandom number generator. Because the performance of pseudorandom sampling schedules can substantially vary based on seed number, this can complicate the task of routine data collection. Approaches such as jittered sampling and stochastic gap sampling are effective at reducing random seed dependence of nonuniform sampling schedules, but still require the specification of a seed number. This work formalizes the use of subrandom number sequences in nonuniform sampling as a means of seed-independent sampling, and compares the performance of three subrandom methods to their pseudorandom counterparts using commonly applied schedule performance metrics. Reconstruction results using experimental datasets are also provided to validate claims made using these performance metrics. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Optimizing an F-16 Squadron Weekly Pilot Schedule for the Turkish Air Force

    DTIC Science & Technology

    2010-03-01

    disrupted schedules are rescheduled , minimizing the total number of changes with respect to the previous schedule’s objective function. Output...producing rosters for a nursing staff in a large general hospital (Dowsland, 1998) and afterwards Aickelin and Dowsland use an Indirect Genetic...algorithm to improve the solutions of the nurse scheduling problem which is similar to the fighter squadron pilot scheduling problem (Aickelin and

  18. Using Optimization to Improve Test Planning

    DTIC Science & Technology

    2017-09-01

    friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool for the test and... evaluation schedulers. 14. SUBJECT TERMS schedule optimization, test planning 15. NUMBER OF PAGES 223 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...make the input more user-friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool

  19. Appointment standardization evaluation in a primary care facility.

    PubMed

    Huang, Yu-Li

    2016-07-11

    Purpose - The purpose of this paper is to evaluate the performance on standardizing appointment slot length in a primary care clinic to understand the impact of providers' preferences and practice differences. Design/methodology/approach - The treatment time data were collected for each provider. There were six patient types: emergency/urgent care (ER/UC), follow-up patient (FU), new patient, office visit (OV), physical exam, and well-child care. Simulation model was developed to capture patient flow and measure patient wait time, provider idle time, cost, overtime, finish time, and the number of patients scheduled. Four scheduling scenarios were compared: scheduled all patients at 20 minutes; scheduled ER/UC, FU, OV at 20 minutes and others at 40 minutes; scheduled patient types on individual provider preference; and scheduled patient types on combined provider preference. Findings - Standardized scheduling among providers increase cost by 57 per cent, patient wait time by 83 per cent, provider idle time by five minutes per patient, overtime by 22 minutes, finish time by 30 minutes, and decrease patient access to care by approximately 11 per cent. An individualized scheduling approach could save as much as 14 per cent on cost and schedule 1.5 more patients. The combined preference method could save about 8 per cent while the number of patients scheduled remained the same. Research limitations/implications - The challenge is to actually disseminate the findings to medical providers and adjust scheduling systems accordingly. Originality/value - This paper concluded standardization of providers' clinic preference and practice negatively impact clinic service quality and access to care.

  20. Estimating dim light melatonin onset (DLMO) phase in adolescents using summer or school-year sleep/wake schedules.

    PubMed

    Crowley, Stephanie J; Acebo, Christine; Fallone, Gahan; Carskadon, Mary A

    2006-12-01

    This analysis examined associations between the salivary dim light melatonin onset (DLMO) phase and self-selected sleep/ wake schedules in groups of children and adolescents during summer vacation and during the school year to determine the degree to which sleep/wake patterns can estimate salivary DLMO phase. Participants slept at home on self-selected schedules for 5 consecutive nights and reported their bedtime and wake-up time via daily telephone messages. Salivary melatonin was sampled in the laboratory on one evening every 30 minutes in dim light (< 50 lux) to determine DLMO phase. Within group bivariate regressions between sleep pattern measures (bedtime, wake-up time, and midsleep time) and DLMO phase were computed. One group, ages 9 to 17 years (mean age = 12.5, SD = 2.3 years, 74 males, 75 females) contributed 149 DLMO phase and sleep/wake pattern measures while on a school year schedule ("school group"). A separate group, ages 9 to 16 years (mean age = 13.1, SD = 1.3 years, 30 males, 29 females) contributed 59 DLMO phase and sleep/wake pattern measures while on a summer schedule ("summer group"). Bedtime, midsleep time, and wake-up time were positively correlated with DLMO phase in both groups. Although all correlation coefficients for the summer group were statistically greater compared to the school group, the regression equations predicted DLMO phase within +/- 1 hour of the measured DLMO phase in approximately 80% for both groups. DLMO phase can be estimated using self-selected sleep/wake patterns during the school year or summer vacation in healthy children and adolescents.

  1. Dosing Schedules for Pneumococcal Conjugate Vaccine

    PubMed Central

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  2. [Stress and fatigue in long distance 2-man cockpit crew].

    PubMed

    Samel, A; Wegmann, H H; Vejvoda, M; Wittiber, K

    1996-01-01

    Common rules on flight-duty times and rest requirements within the European Union are under intense discussion. In the deliberations, results from scientific investigations should be considered. As part of a research programme concerning legal aspects of two-pilot operations on long-haul routes, the purpose of the studies was to investigate two-crew extended range operations during transmeridian and transequatorial flight schedules. The studies were conducted with two German charter airlines on the transmeridian routes Düsseldorf (DUS)-Atlanta (ATL) and Hamburg (HAM)-Los Angeles (LAX), and on the north-south route Frankfurt (FRA)-Mahe (SEZ) including two consecutive night flights with a short layover. In total, 25 rotations (50 flights) have been investigated by pre-, in-, and post-flight data collection from the two pilots being the minimum required crew. Recordings included sleep, taskload, fatigue and stress by measurements of EEG, ECG, motor activity and subjective ratings. During the transmeridian schedules, pilots lost one night of sleep because of the return flights which were conducted at night. The resulting sleep deficit was 8.2 h. During the layover of the SEZ-rotation with a duration of 14 h on average, sleep was shortened by 2 h compared with baseline sleep. The two consecutive night flights resulted in a sleep loss of 9.3 h upon return to home base. Inflight ratings of taskload showed low levels during the atlantic flights, and moderate grades during the north-south transitions. Fatigue ratings exhibited an increasing level with progressing flight duration. Towards the end of long US-westcoast flights performed at day-time, and in all night flights, fatigue was enhanced compared to the "baseline" ratings collected during the DUS-ATL flights. Fatigue was scored at a critical level by several pilots, particularly during the return flight SEZ-FRA when fatigue was severely pronounced. The subjective fatigue ratings were confirmed by the objective measurements of motor activity, brain-wave activity (occurrences of micro-sleep) and heart rate which indicated drowsiness and a low state of vigilance and alertness during all night flights under study. From the findings it is concluded that duty schedules, as conducted on the route HAM-LAX (because of long duty hours), and particularly on the route FRA-SEZ, (because of consecutive night duties) are coming close to the limits of mental and physiological capacity. With respect to legal aspects, the results have significance and should promote further deliberations for advanced schemes of flight duty time limitations and rest requirements.

  3. Day and night shift schedules are associated with lower sleep quality in Evening-types.

    PubMed

    Martin, Jeanne Sophie; Laberge, Luc; Sasseville, Alexandre; Bérubé, Marilie; Alain, Samuel; Houle, Jérôme; Hébert, Marc

    2015-06-01

    Eveningness has been suggested as a facilitating factor in adaptation to shift work, with several studies reporting evening chronotypes (E-types) as better sleepers when on night shifts. Conversely, eveningness has been associated with more sleep complaints during day shifts. However, sleep during day shifts has received limited attention in previous studies assessing chronotypes in shift workers. Environmental light exposure has also been reported to differ between chronotypes in day workers. Activity is also known to provide temporal input to the circadian clock. Therefore, the aim of this study was to compare objective sleep, light exposure and activity levels between chronotypes, both during the night and day shifts. Thirty-nine patrol police patrol officers working on a fast rotating shift schedule (mean age ± SD: 28.9 ± 3.2 yrs; 28 males) participated in this study. All subjects completed the Morningness-Eveningness Questionnaire (MEQ). Sleep and activity were monitored with actigraphy (Actiwatch-L; Mini-Mitter/Respironics, Bend, OR) for four consecutive night shifts and four consecutive day shifts (night work schedule: 00:00 h-07:00 h; day work schedule: 07:00 h-15:00 h). Sleep and activity parameters were calculated with Actiware software. MEQ scores ranged from 26 to 56; no subject was categorized as Morning-type. E-types (n = 13) showed significantly lower sleep efficiency, longer snooze time and spent more time awake after sleep onset than Intermediate-types (I-types, n = 26) for both the night and day shifts. E-types also exhibited shorter and more numerous sleep bouts. Furthermore, when napping was taken into account, E-types had shorter total sleep duration than I-types during the day shifts. E-types were more active during the first hours of their night shift when compared to I-types. Also, all participants spent more time active and had higher amount of activity per minute during day shifts when compared to night shifts. No difference was found regarding light exposure between chronotypes. In conclusion, sleep parameters revealed poorer sleep quality in E-types for both the night and day shifts. These differences could not be explained by sleep opportunity, light exposure or activity levels. This study challenges the notion that E-types adapt better to night shifts. Further studies must verify whether E-types exhibit lower sleep quality than Morning-types.

  4. Computer Applications in Class and Transportation Scheduling. Educational Management Review Series Number 1.

    ERIC Educational Resources Information Center

    Piele, Philip K.

    This document shows how computer technology can aid educators in meeting demands for improved class scheduling and more efficient use of transportation resources. The first section surveys literature on operational systems that provide individualized scheduling for students, varied class structures, and maximum use of space and staff skills.…

  5. Second-Order Schedules of Token Reinforcement with Pigeons: Implications for Unit Price

    ERIC Educational Resources Information Center

    Bullock, Christopher E.; Hackenberg, Timothy D.

    2006-01-01

    Four pigeons were exposed to second-order schedules of token reinforcement, with stimulus lights serving as token reinforcers. Tokens were earned according to a fixed-ratio (token-production) schedule, with the opportunity to exchange tokens for food (exchange period) occurring after a fixed number had been produced (exchange-production ratio).…

  6. 77 FR 76506 - Notice of Proposed Information Collection: Comment Request; Rent Schedule-Low Rent Housing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5607-N-36] Notice of Proposed Information Collection: Comment Request; Rent Schedule--Low Rent Housing AGENCY: Office of the Assistant... information: Title of Proposal: Rent Schedule--Low Rent Housing. OMB Control Number, if applicable: 2502-0012...

  7. 40 CFR Appendix Xiv to Part 86 - Determination of Acceptable Durability Test Schedule for Light-Duty Vehicles and Light Light-Duty...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...

  8. 40 CFR Appendix Xiv to Part 86 - Determination of Acceptable Durability Test Schedule for Light-Duty Vehicles and Light Light-Duty...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...

  9. 40 CFR Appendix Xiv to Part 86 - Determination of Acceptable Durability Test Schedule for Light-Duty Vehicles and Light Light-Duty...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...

  10. 40 CFR Appendix Xiv to Part 86 - Determination of Acceptable Durability Test Schedule for Light-Duty Vehicles and Light Light-Duty...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... schedule in step 1 of this appendix. This schedule will be designated as the standard (std) test schedule...)2/Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns = Total number of.... Refer to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std. 6. If (Aprop...

  11. The Effect of Biologically Effective Dose and Radiation Treatment Schedule on Overall Survival in Stage I Non-Small Cell Lung Cancer Patients Treated With Stereotactic Body Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahl, John M.; Ross, Rudi; Harder, Eileen M.

    Purpose: To determine the effect of biologically effective dose (BED{sub 10}) and radiation treatment schedule on overall survival (OS) in patients with early-stage non-small cell lung cancer (NSCLC) undergoing stereotactic body radiation therapy (SBRT). Methods and Materials: Using data from 65 treatment centers in the United States, we retrospectively reviewed the records of T1-2 N0 NSCLC patients undergoing SBRT alone from 2006 to 2014. Biologically relevant covariates, including dose per fraction, number of fractions, and time between fractions, were used to quantify BED{sub 10} and radiation treatment schedule. The linear-quadratic equation was used to calculate BED{sub 10} and to generatemore » a dichotomous dose variable of <105 Gy versus ≥105 Gy BED{sub 10}. The primary outcome was OS. We used the Kaplan-Meier method, the log–rank test, and Cox proportional hazards regression with propensity score matching to determine whether prescription BED{sub 10} was associated with OS. Results: We identified 747 patients who met inclusion criteria. The median BED{sub 10} was 132 Gy, and 59 (7.7%) had consecutive-day fractions. Median follow-up was 41 months, and 452 patients (60.5%) had died by the conclusion of the study. The 581 patients receiving ≥105 Gy BED{sub 10} had a median survival of 28 months, whereas the 166 patients receiving <105 Gy BED{sub 10} had a median survival of 22 months (log–rank, P=.01). Radiation treatment schedule was not a significant predictor of OS on univariable analysis. After adjusting for T stage, sex, tumor histology, and Eastern Cooperative Oncology Group performance status, BED{sub 10} ≥105 Gy versus <105 Gy remained significantly associated with improved OS (hazard ratio 0.78, 95% confidence interval 0.62-0.98, P=.03). Propensity score matching on imbalanced variables within high- and low-dose cohorts confirmed a survival benefit with higher prescription dose. Conclusions: We found that dose escalation to 105 Gy BED{sub 10} and beyond may improve survival in NSCLC patients treated with SBRT.« less

  12. MIP models and hybrid algorithms for simultaneous job splitting and scheduling on unrelated parallel machines.

    PubMed

    Eroglu, Duygu Yilmaz; Ozmutlu, H Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms.

  13. The effect of the number of consecutive night shifts on diurnal rhythms in cortisol, melatonin and heart rate variability (HRV): a systematic review of field studies.

    PubMed

    Jensen, Marie Aarrebo; Garde, Anne Helene; Kristiansen, Jesper; Nabe-Nielsen, Kirsten; Hansen, Åse Marie

    2016-05-01

    The purpose of this review is to summarize the current knowledge from field studies on how many consecutive night shifts are required for adaptation of diurnal rhythms in cortisol, melatonin and heart rate variability (HRV) to night work. A systematic search of the databases PubMed and Web of Science resulted in 18 studies selected for review. Cortisol was measured in five studies, melatonin in 11 studies and HRV in four studies. Diurnal rhythms were assessed by use of several different measures based on three to eight samples per day for cortisol and melatonin and 24-h recordings for HRV. Most of the studies in the review were small studies with less than 30 participants, and most studies evaluated diurnal rhythms after only two consecutive night shifts whereas only six studies used seven or more consecutive night shifts. The majority of studies found that adaptation to night work had not occurred after two consecutive night shifts, whereas a small number found evidence for full adaptation after seven consecutive night shifts based on diurnal rhythms in cortisol and melatonin. There are methodological differences in the field studies analyzing diurnal rhythms and large diversity in the occupational fields studied. Nevertheless, we conclude that diurnal rhythms in cortisol, melatonin and HRV are not adapted to night work after 1-3 consecutive night shifts. Studies are needed to establish how many consecutive night shifts are needed for full adaptation of diurnal rhythms to night work.

  14. Consecutive learning of opposing unimanual motor tasks using the right arm followed by the left arm causes intermanual interference

    PubMed Central

    Thürer, Benjamin; Stein, Thorsten

    2017-01-01

    Intermanual transfer (motor memory generalization across arms) and motor memory interference (impairment of retest performance in consecutive motor learning) are well-investigated motor learning phenomena. However, the interplay of these phenomena remains elusive, i.e., whether intermanual interference occurs when two unimanual tasks are consecutively learned using different arms. Here, we examine intermanual interference when subjects consecutively adapt their right and left arm movements to novel dynamics. We considered two force field tasks A and B which were of the same structure but mirrored orientation (B = -A). The first test group (ABA-group) consecutively learned task A using their right arm and task B using their left arm before being retested for task A with their right arm. Another test group (AAA-group) learned only task A in the same right-left-right arm schedule. Control subjects learned task A using their right arm without intermediate left arm learning. All groups were able to adapt their right arm movements to force field A and both test groups showed significant intermanual transfer of this initial learning to the contralateral left arm of 21.9% (ABA-group) and 27.6% (AAA-group). Consecutively, both test groups adapted their left arm movements to force field B (ABA-group) or force field A (AAA-group). For the ABA-group, left arm learning caused significant intermanual interference of the initially learned right arm task (68.3% performance decrease). The performance decrease of the AAA-group (10.2%) did not differ from controls (15.5%). These findings suggest that motor control and learning of right and left arm movements involve partly similar neural networks or underlie a vital interhemispheric connectivity. Moreover, our results suggest a preferred internal task representation in extrinsic Cartesian-based coordinates rather than in intrinsic joint-based coordinates because interference was absent when learning was performed in extrinsically equivalent fashion (AAA-group) but interference occurred when learning was performed in intrinsically equivalent fashion (ABA-group). PMID:28459833

  15. Consecutive learning of opposing unimanual motor tasks using the right arm followed by the left arm causes intermanual interference.

    PubMed

    Stockinger, Christian; Thürer, Benjamin; Stein, Thorsten

    2017-01-01

    Intermanual transfer (motor memory generalization across arms) and motor memory interference (impairment of retest performance in consecutive motor learning) are well-investigated motor learning phenomena. However, the interplay of these phenomena remains elusive, i.e., whether intermanual interference occurs when two unimanual tasks are consecutively learned using different arms. Here, we examine intermanual interference when subjects consecutively adapt their right and left arm movements to novel dynamics. We considered two force field tasks A and B which were of the same structure but mirrored orientation (B = -A). The first test group (ABA-group) consecutively learned task A using their right arm and task B using their left arm before being retested for task A with their right arm. Another test group (AAA-group) learned only task A in the same right-left-right arm schedule. Control subjects learned task A using their right arm without intermediate left arm learning. All groups were able to adapt their right arm movements to force field A and both test groups showed significant intermanual transfer of this initial learning to the contralateral left arm of 21.9% (ABA-group) and 27.6% (AAA-group). Consecutively, both test groups adapted their left arm movements to force field B (ABA-group) or force field A (AAA-group). For the ABA-group, left arm learning caused significant intermanual interference of the initially learned right arm task (68.3% performance decrease). The performance decrease of the AAA-group (10.2%) did not differ from controls (15.5%). These findings suggest that motor control and learning of right and left arm movements involve partly similar neural networks or underlie a vital interhemispheric connectivity. Moreover, our results suggest a preferred internal task representation in extrinsic Cartesian-based coordinates rather than in intrinsic joint-based coordinates because interference was absent when learning was performed in extrinsically equivalent fashion (AAA-group) but interference occurred when learning was performed in intrinsically equivalent fashion (ABA-group).

  16. Bulk Leisure--Problem or Blessing?

    ERIC Educational Resources Information Center

    Beland, Robert M.

    1983-01-01

    With an increasing number of the nation's work force experiencing "bulk leisure" time because of new work scheduling procedures, parks and recreation offices are encouraged to examine their program scheduling and content. (JM)

  17. 5 CFR 410.310 - Computing time in training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Code: (a) An employee on an 8-hour day work schedule assigned to training is counted as being in... employee on an alternative work schedule, the agency is responsible for determining the number of hours the... without pay for the purpose of the training. (c) An employee on an 8-hour or an alternative work schedule...

  18. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...

  19. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...

  20. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Acceptable Exhaust Regeneration Durability-Data Test Schedule for Diesel Cycle Vehicles Equipped With... Appendix XV to Part 86—Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test... = Total number of regeneration emission tests. (Subscript “s” refers to standard test schedule) 5. Refer...

  1. 5 CFR 410.310 - Computing time in training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Code: (a) An employee on an 8-hour day work schedule assigned to training is counted as being in... employee on an alternative work schedule, the agency is responsible for determining the number of hours the... without pay for the purpose of the training. (c) An employee on an 8-hour or an alternative work schedule...

  2. Cost-efficient scheduling of FAST observations

    NASA Astrophysics Data System (ADS)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  3. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  4. Differences in cortisol profiles and circadian adjustment time between nurses working night shifts and regular day shifts: A prospective longitudinal study.

    PubMed

    Niu, Shu-Fen; Chung, Min-Huey; Chu, Hsin; Tsai, Jui-Chen; Lin, Chun-Chieh; Liao, Yuan-Mei; Ou, Keng-Liang; O'Brien, Anthony Paul; Chou, Kuei-Ru

    2015-07-01

    This study explored the differences in the circadian salivary cortisol profiles between nurses working night shifts and regular day shifts following a slow rotating shift schedule to assess the number of days required for adjusting the circadian rhythm of salivary cortisol levels in nurses working consecutive night shifts and the number of days off required to restore the diurnal circadian rhythm of salivary cortisol levels. This was a prospective, longitudinal, parallel-group comparative study. The participants were randomly assigned to night and day-shift groups, and saliva samples were collected to measure their cortisol levels and circadian secretion patterns. Significant differences were observed in the overall salivary cortisol pattern parameters (cortisol awakening response, changes in cortisol profiles between 6 and 12h after awakening, and changes in cortisol profiles between 30 min and 12 h after awakening) from Days 2 to 4 of the workdays between both groups. However, on Day 2 of the days off, both groups exhibited similar cortisol profiles and the cortisol profiles in the night-shift group were restored. Nurses working night shifts require at least 4 days to adjust their circadian rhythms of cortisol secretions. Moreover, on changing from night shift to other shifts, nurses must be allowed more than 2 days off work. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Oral cryotherapy reduces mucositis and opioid use after myeloablative therapy--a randomized controlled trial.

    PubMed

    Svanberg, Anncarin; Birgegård, Gunnar; Ohrn, Kerstin

    2007-10-01

    Mucositis is a major complication in myeloablative therapy, which often necessitates advanced pharmacological pain treatment, including i.v. opioids. Attempts to prevent oral mucositis have included oral cryotherapy, which has been shown to reduce mucositis, but there is a lack of knowledge concerning the effect of oral cryotherapy on opioid use by reducing the mucositis for patients treated with myeloablative therapy before bone marrow transplantation (BMT). The aim of the present study was to evaluate if oral cryotherapy could delay or alleviate the development of mucositis and thereby reduce the number of days with i.v. opioids among patients who receive myeloablative therapy before BMT. Eighty patients 18 years and older, scheduled for BMT, were included consecutively and randomised to oral cryotherapy or standard oral care. A stratified randomisation was used with regard to type of transplantation. Intensity of pain, severity of mucositis and use of opioids were recorded using pain visual analogue scale (VAS) scores, mucositis index scores and medical and nursing charts. This study showed that patients receiving oral cryotherapy had less pronounced mucositis and significantly fewer days with i.v. opioids than the control group. In the autologous setting, cryotherapy patients also needed significantly lower total dose of opioids. Oral cryotherapy is an effective and well-tolerated therapy to alleviate mucositis and consequently reduce the number of days with i.v. opioids among patients treated with myeloablative therapy before BMT.

  6. Assessing change in quality of life and dental anxiety in young children following dental rehabilitation under general anesthesia.

    PubMed

    Cantekin, Kenan; Yildirim, Mustafa Denizhan; Cantekin, Isin

    2014-01-01

    This study's purpose was to investigate how young children's and parent/caregivers' oral health-related quality of life and children's dental fears were affected by dental rehabilitation under general anesthesia (DRGA). A consecutive clinical sample of dyads of parents/caregivers and their four- to six-year-old children who received DRGA were surveyed before and after DRGA. Parents/caregivers responded through a self-administered questionnaire [Early Childhood Oral Health Impact Scale (ECOHIS)], and children received a dentist-administered questionnaire [children's fear survey schedule-dental subscale (CFSS-DS)]. The final sample consisted of 311 children/caregiver dyads. One to six teeth were extracted in 91 percent of children. There was a 44 percent decrease in total ECOHIS scores following treatment (P<.001). Overall child impact section scores decreased 34 percent following treatment (P<.001), and family impact section scores decreased 65 percent (P<.001). CFSS-DS anxiety scores after dental treatment were significantly higher for 14 of 15 situations/conditions assessed (P<.001). There was a trend of higher CFSS-DS scores in children who received increasing numbers of extractions. Children's and parent/caregivers' quality of life improved after the children received dental rehabilitation under general anesthesia, and children's fears increased for all situations tested. The number of extractions the children received was associated with increased levels of fear.

  7. Heuristic-based scheduling algorithm for high level synthesis

    NASA Technical Reports Server (NTRS)

    Mohamed, Gulam; Tan, Han-Ngee; Chng, Chew-Lye

    1992-01-01

    A new scheduling algorithm is proposed which uses a combination of a resource utilization chart, a heuristic algorithm to estimate the minimum number of hardware units based on operator mobilities, and a list-scheduling technique to achieve fast and near optimal schedules. The schedule time of this algorithm is almost independent of the length of mobilities of operators as can be seen from the benchmark example (fifth order digital elliptical wave filter) presented when the cycle time was increased from 17 to 18 and then to 21 cycles. It is implemented in C on a SUN3/60 workstation.

  8. Optimization Models for Scheduling of Jobs

    PubMed Central

    Indika, S. H. Sathish; Shier, Douglas R.

    2006-01-01

    This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921

  9. Operations mission planner beyond the baseline

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric; Cooper, Lynne

    1991-01-01

    The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

  10. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    NASA Astrophysics Data System (ADS)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  11. Automatic identification of bullet signatures based on consecutive matching striae (CMS) criteria.

    PubMed

    Chu, Wei; Thompson, Robert M; Song, John; Vorburger, Theodore V

    2013-09-10

    The consecutive matching striae (CMS) numeric criteria for firearm and toolmark identifications have been widely accepted by forensic examiners, although there have been questions concerning its observer subjectivity and limited statistical support. In this paper, based on signal processing and extraction, a model for the automatic and objective counting of CMS is proposed. The position and shape information of the striae on the bullet land is represented by a feature profile, which is used for determining the CMS number automatically. Rapid counting of CMS number provides a basis for ballistics correlations with large databases and further statistical and probability analysis. Experimental results in this report using bullets fired from ten consecutively manufactured barrels support this developed model. Published by Elsevier Ireland Ltd.

  12. The perioperative charge equivalence of interstitial brachytherapy and radical prostatectomy with 1-year followup.

    PubMed

    Kohan, A D; Armenakas, N A; Fracchia, J A

    2000-02-01

    We compare the comprehensive 1-year charges in a consecutive group of patients undergoing radical prostatectomy and transperineal interstitial brachytherapy for clinically localized prostate cancer at a single urban institution. A total of 60 consecutive men with clinically localized prostate cancer (T1-T2, N0, M0) were treated during a 15-month period with radical prostatectomy or interstitial brachytherapy. Hospital and outpatient records were analyzed for each patient in regard to preoperative, operative and postoperative charges. Parameters included number of encounters, diagnostic and therapeutic interventions, hospitalization and operative charges, and followup visits, diagnostic tests and interventions for 1 year. All charge calculations were based arbitrarily on the 1996 Medicare fee schedule, factoring in the mandated global charge reimbursement period of 90 days for both procedures. Of the patients 38 underwent radical prostatectomy (prostatectomy group) and 22 underwent interstitial brachytherapy (brachytherapy group). The brachytherapy group was older with higher pretreatment serum prostate specific antigen and clinical stage disease, and more frequently received neoadjuvant hormonal therapy compared to the prostatectomy group. The 2 groups were similar in Gleason score and, when applicable, duration of neoadjuvant hormonal therapy. Preoperative charges were 15.3% lower for prostatectomy than for brachytherapy (not statistically significant). Conversely, operative charges for prostatectomy were 13.5% higher (p = 0.04). The major difference among preoperative, operative and postoperative charges was for those incurred postoperatively by the brachytherapy group, which were 56.0% higher than those for the prostatectomy group ($2,285.20 versus $1,007.20, p = 0.0004). Transperineal interstitial seed implantation is perceived by many as more cost-effective than radical prostatectomy for patients with clinically localized prostate cancer. We demonstrated that when such patients were followed for 1 year, the comprehensive charges for radical prostatectomy and interstitial brachytherapy were equivalent.

  13. Single-Centre Experience with Percutaneous Cryoablation of Breast Cancer in 23 Consecutive Non-surgical Patients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cazzato, Roberto Luigi, E-mail: r.cazzato@unicampus.it; Lara, Christine Tunon de, E-mail: c.tunondelara@bordeaux.unicancer.fr; Buy, Xavier, E-mail: x.buy@bordeaux.unicancer.fr

    AimTo present our single-centre prospective experience on the use of cryoablation (CA) applied to treat primary breast cancer (BC) in a cohort of patients unsuitable for surgical treatment.Materials and MethodsTwenty-three consecutive post-menopausal female patients (median age 85 years; range 56–96) underwent percutaneous CA of unifocal, biopsy-proven BC, under ultrasound/computed tomography (US/CT) guidance. Clinical and dynamic contrast-enhanced magnetic resonance imaging (DCE-MRI) follow-ups were systematically scheduled at 3, 12, 18 and 24 months. Local tumour control was assessed by comparing baseline and follow-up DCE-MRI.ResultsTwenty-three BC (median size 14 mm) were treated under local anaesthesia (78.3 %) or local anaesthesia and conscious sedation (21.7 %). Median number ofmore » cryo-probes applied per session was 2.0. A “dual-freezing” protocol was applied for the first ten patients and a more aggressive “triple-freezing” protocol for the remaining 13. Median follow-up was 14.6 months. Five patients recurred during follow-up and two were successfully re-treated with CA. Five patients presented immediate CA-related complications: four hematomas evolved uneventfully at 3-month follow-up and one skin burn resulted in skin inflammation and skin retraction at 3 and 12 months, respectively.ConclusionsPercutaneous CA is safe and well tolerated for non-resected elderly BC patients. Procedures can be proposed under local anaesthesia only. Given the insulation properties of the breast gland, aggressive CA protocols are required. Prospective studies are needed to better understand the potential role of CA in the local treatment of early BC.« less

  14. Autoshaping i.v. cocaine self-administration in rats: effects of nondrug alternative reinforcers on acquisition.

    PubMed

    Carroll, M E; Lac, S T

    1993-01-01

    The purpose of this experiment was to examine the effects of a nondrug alternative reinforcer and feeding conditions on the acquisition of cocaine self-administration. Rats were autoshaped to press a lever that resulted in a 0.2 mg/kg i.v. cocaine infusion. Responses on the lever were monitored during six consecutive autoshaping sessions that occurred each day. A retractable lever was inserted into the operant chamber on a random time 60 s schedule 10 times per session for six sessions that began each hour. Each day the six autoshaping sessions were followed by a 6-h cocaine self-administration session. During self-administration the lever remained extended, and each response on the lever resulted in a cocaine infusion (0.2 mg/kg). The criterion for acquisition of cocaine-reinforced behavior was met when there were 5 consecutive days during which the mean number of infusions during the 6-h self-administration session was at least 100. This procedure was repeated daily until the criterion was met or 30 days elapsed. The rats were also trained to respond on lick-operated automatic drinking devices that delivered 0.05 ml water or a glucose and saccharin solution (G + S) contingent upon each lick response. Five groups of 12-14 rats were compared. The first four groups constituted a 2 x 2 factorial design whereby either G + S or water was available in the home cage for 3 weeks before autoshaping began and G + S or water was available in the operant chamber during autoshaping. These groups were limited to 20 g food per day and all had free access to water.(ABSTRACT TRUNCATED AT 250 WORDS)

  15. Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines

    PubMed Central

    Zhang, Guang-Qian; Wang, Jian-Jun; Liu, Ya-Jing

    2014-01-01

    m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem. PMID:24982933

  16. Algorithm comparison for schedule optimization in MR fingerprinting.

    PubMed

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Decompression from He-N2-O2 (TRIMIX) Bounce Dives Is Not More Efficient Than From He-O2 (HELIOX) Bounce Dives

    DTIC Science & Technology

    2015-05-28

    Diver Characteristics Appendix E Diving Schedule Appendix F Medical Incidents Appendix G UBA Gas Compositions iv ACKNOWLEDGEMENTS The...experimental dives (median = 3). The schedule of each diver’s participation in experimental dives is given in Appendix E . Divers were required to avoid any...divers’ participation on each test schedule is given in Appendix E . The numbers of completed man-dives on the two schedules are not multiples of the

  18. Associations between number of consecutive night shifts and impairment of neurobehavioral performance during a subsequent simulated night shift.

    PubMed

    Magee, Michelle; Sletten, Tracey L; Ferguson, Sally A; Grunstein, Ronald R; Anderson, Clare; Kennaway, David J; Lockley, Steven W; Rajaratnam, Shantha Mw

    2016-05-01

    This study aimed to investigate sleep and circadian phase in the relationships between neurobehavioral performance and the number of consecutive shifts worked. Thirty-four shift workers [20 men, mean age 31.8 (SD 10.9) years] worked 2-7 consecutive night shifts immediately prior to a laboratory-based, simulated night shift. For 7 days prior, participants worked their usual shift sequence, and sleep was assessed with logs and actigraphy. Participants completed a 10-minute auditory psychomotor vigilance task (PVT) at the start (~21:00 hours) and end (~07:00 hours) of the simulated night shift. Mean reaction times (RT), number of lapses and RT distribution was compared between those who worked 2-3 consecutive night shifts versus those who worked 4-7 shifts. Following 4-7 shifts, night shift workers had significantly longer mean RT at the start and end of shift, compared to those who worked 2-3 shifts. The slowest and fastest 10% RT were significantly slower at the start, but not end, of shift among participants who worked 4-7 nights. Those working 4-7 nights also demonstrated a broader RT distribution at the start and end of shift and had significantly slower RT based on cumulative distribution analysis (5 (th), 25 (th), 50 (th), 75 (th)percentiles at the start of shift; 75th percentile at the end of shift). No group differences in sleep parameters were found for 7 days and 24 hours prior to the simulated night shift. A greater number of consecutive night shifts has a negative impact on neurobehavioral performance, likely due to cognitive slowing.

  19. Simultaneously optimizing dose and schedule of a new cytotoxic agent.

    PubMed

    Braun, Thomas M; Thall, Peter F; Nguyen, Hoang; de Lima, Marcos

    2007-01-01

    Traditionally, phase I clinical trial designs are based upon one predefined course of treatment while varying among patients the dose given at each administration. In actual medical practice, patients receive a schedule comprised of several courses of treatment, and some patients may receive one or more dose reductions or delays during treatment. Consequently, the overall risk of toxicity for each patient is a function of both actual schedule of treatment and the differing doses used at each adminstration. Our goal is to provide a practical phase I clinical trial design that more accurately reflects actual medical practice by accounting for both dose per administration and schedule. We propose an outcome-adaptive Bayesian design that simultaneously optimizes both dose and schedule in terms of the overall risk of toxicity, based on time-to-toxicity outcomes. We use computer simulation as a tool to calibrate design parameters. We describe a phase I trial in allogeneic bone marrow transplantation that was designed and is currently being conducted using our new method. Our computer simulations demonstrate that our method outperforms any method that searches for an optimal dose but does not allow schedule to vary, both in terms of the probability of identifying optimal (dose, schedule) combinations, and the numbers of patients assigned to those combinations in the trial. Our design requires greater sample sizes than those seen in traditional phase I studies due to the larger number of treatment combinations examined. Our design also assumes that the effects of multiple administrations are independent of each other and that the hazard of toxicity is the same for all administrations. Our design is the first for phase I clinical trials that is sufficiently flexible and practical to truly reflect clinical practice by varying both dose and the timing and number of administrations given to each patient.

  20. A Study of the Impact of Block Scheduling on Student Academic Achievement in Public High Schools

    ERIC Educational Resources Information Center

    Norton, Mary Kay

    2010-01-01

    The number of public high schools implementing a semester 4 x 4 block scheduling design within the state of South Carolina has tripled since 2005. However, minimal local research has been conducted regarding the impact of block scheduling on student academic achievement. The purpose of this study was to determine if significant differences exist…

  1. The Design of a Real Time Operating System for a Fault Tolerant Microcomputer

    DTIC Science & Technology

    1986-12-01

    Scheduler then enqueues all the new jobs for the new frame. Upon completion of the Purge and Task Scheduler routines the Cycle Interrupt Handler returns...the scheduling of new tasks in a new minor cycle to make room for the new jobs . The purge operation will usually not remove the same number of jobs each

  2. 77 FR 57012 - Schedule of Fees for Consular Services, Department of State and Overseas Embassies and Consulates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... (Schedule) for a number of different visa fees. The Department of State adopts the rule as final, without... made changes to the Schedule of Fees for Consular Services for visa fees and provided 60 days for... April 13, 2012. Non-Petition based Nonimmigrant Visa Application (except E category): from $140 to $160...

  3. The Impact of Block Scheduling on Various Indicators of School Success.

    ERIC Educational Resources Information Center

    Nichols, Joe D.

    This project focused on the collection and analysis of longitudinal student data generated by six high schools from a large urban school system in the Midwest. Two of the schools recently converted to a 4 X 4 scheduling structure, while 3 additional schools have used a block-8 scheduling structure for a number of years. One school maintains a…

  4. Information Requirements Analyses for Transatmospheric Vehicles

    DTIC Science & Technology

    1992-06-01

    include takeoff inclination, Mach number/fuel burn schedule , planned headings, planned altitudes, threat types/locations, communications satel- lite...network availability schedules , and P/L/target-specific mission events. The mission materials are transferred to the TAV by means of magnetic media...constraints. It also monitors actual fuel consumption, compares it against the mission fuel schedule , predicts rest-of-mission fuel consumption, and

  5. On the number of different dynamics in Boolean networks with deterministic update schedules.

    PubMed

    Aracena, J; Demongeot, J; Fanchon, E; Montalva, M

    2013-04-01

    Deterministic Boolean networks are a type of discrete dynamical systems widely used in the modeling of genetic networks. The dynamics of such systems is characterized by the local activation functions and the update schedule, i.e., the order in which the nodes are updated. In this paper, we address the problem of knowing the different dynamics of a Boolean network when the update schedule is changed. We begin by proving that the problem of the existence of a pair of update schedules with different dynamics is NP-complete. However, we show that certain structural properties of the interaction diagraph are sufficient for guaranteeing distinct dynamics of a network. In [1] the authors define equivalence classes which have the property that all the update schedules of a given class yield the same dynamics. In order to determine the dynamics associated to a network, we develop an algorithm to efficiently enumerate the above equivalence classes by selecting a representative update schedule for each class with a minimum number of blocks. Finally, we run this algorithm on the well known Arabidopsis thaliana network to determine the full spectrum of its different dynamics. Copyright © 2013 Elsevier Inc. All rights reserved.

  6. CaLRS: A Critical-Aware Shared LLC Request Scheduling Algorithm on GPGPU

    PubMed Central

    Ma, Jianliang; Meng, Jinglei; Chen, Tianzhou; Wu, Minghui

    2015-01-01

    Ultra high thread-level parallelism in modern GPUs usually introduces numerous memory requests simultaneously. So there are always plenty of memory requests waiting at each bank of the shared LLC (L2 in this paper) and global memory. For global memory, various schedulers have already been developed to adjust the request sequence. But we find few work has ever focused on the service sequence on the shared LLC. We measured that a big number of GPU applications always queue at LLC bank for services, which provide opportunity to optimize the service order on LLC. Through adjusting the GPU memory request service order, we can improve the schedulability of SM. So we proposed a critical-aware shared LLC request scheduling algorithm (CaLRS) in this paper. The priority representative of memory request is critical for CaLRS. We use the number of memory requests that originate from the same warp but have not been serviced when they arrive at the shared LLC bank to represent the criticality of each warp. Experiments show that the proposed scheme can boost the SM schedulability effectively by promoting the scheduling priority of the memory requests with high criticality and improves the performance of GPU indirectly. PMID:25729772

  7. Ovum pick up, in vitro embryo production, and pregnancy rates from a large-scale commercial program using Nelore cattle (Bos indicus) donors.

    PubMed

    Pontes, J H F; Melo Sterza, F A; Basso, A C; Ferreira, C R; Sanches, B V; Rubin, K C P; Seneda, M M

    2011-06-01

    The objective was to clarify in vitro production of bovine embryos in Brazil. Data from 656 ovum pick-up/in vitro production (OPU/IVP) procedures, performed on 317 Nelore (Bos indicus) donors, without hormone stimulation or control of ovarian follicular waves, were analysed. Donors were subjected to OPU from one to nine times (no specific schedule), with < 15 d between consecutive procedures. There were 20,848 oocytes, of which 15,747 (75.53%) were considered viable, 5,446 embryos were obtained, 5,398 embryos were immediately transferred, resulting in 1,974 pregnancies (36.57%) at Day 30 and 1,788 (33.12%) pregnancies at Day 60. The average number of total and viable oocytes produced per OPU session was (mean ± SEM) 30.84 ± 0.88 and 23.35 ± 0.7 (average of 8.1 ± 0.3 embryos and 3.0 ± 0.1 pregnancies per OPU-IVP procedure). Since oocyte production varied widely among donor, they were designated as very high, high, intermediate, and low, with 58.94 ± 2.04, 32.61 ± 0.50, 22.13 ± 0.50, and 10.26 ± 0.57 oocytes, respectively, produced by 78, 80, 79, and 80 donors. The number of viable oocytes recovered ranged from 0 to 128; since donors with numerous viable oocytes produced many viable embryos and pregnancies, oocyte production was useful for donor selection. However, there was no significant effect of the number of OPU sessions per donor on mean numbers of oocytes produced. In conclusion, we confirmed field reports of high oocyte production by some Nelore donors and demonstrated individual variation in oocyte yield, which was associated with embryo production and pregnancy rates. Copyright © 2011 Elsevier Inc. All rights reserved.

  8. Queue position in the endoscopic schedule impacts effectiveness of colonoscopy.

    PubMed

    Lee, Alexander; Iskander, John M; Gupta, Nitin; Borg, Brian B; Zuckerman, Gary; Banerjee, Bhaskar; Gyawali, C Prakash

    2011-08-01

    Endoscopist fatigue potentially impacts colonoscopy. Fatigue is difficult to quantitate, but polyp detection rates between non-fatigued and fatigued time periods could represent a surrogate marker. We assessed whether timing variables impacted polyp detection rates at a busy tertiary care endoscopy suite. Consecutive patients undergoing colonoscopy were retrospectively identified. Indications, clinical demographics, pre-procedural, and procedural variables were extracted from chart review; colonoscopy findings were determined from the procedure reports. Three separate timing variables were assessed as surrogate markers for endoscopist fatigue: morning vs. afternoon procedures, start times throughout the day, and queue position, a unique variable that takes into account the number of procedures performed before the colonoscopy of interest. Univariate and multivariate analyses were performed to determine whether timing variables and other clinical, pre-procedural, and procedural variables predicted polyp detection. During the 4-month study period, 1,083 outpatient colonoscopy procedures (57.5±0.5 years, 59.5% female) were identified, performed by 28 endoscopists (mean 38.7 procedures/endoscopist), with a mean polyp detection rate of 0.851/colonoscopy. At least, one adenoma was detected in 297 procedures (27.4%). A 12.4% reduction in mean detected polyps was detected between morning and afternoon procedures (0.90±0.06 vs. 0.76±0.06, P=0.15). Using start time on a continuous scale, however, each elapsed hour in the day was associated with a 4.6% reduction in polyp detection (P=0.005). When queue position was assessed, a 5.4% reduction in polyp detection was noted with each increase in queue position (P=0.016). These results remained significant when controlled for each individual endoscopist. Polyp detection rates decline as time passes during an endoscopist's schedule, potentially from endoscopist fatigue. Queue position may be a novel surrogate measure for operator fatigue.

  9. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    PubMed

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  10. Efficacy of melatonin with behavioural sleep-wake scheduling for delayed sleep-wake phase disorder: A double-blind, randomised clinical trial.

    PubMed

    Sletten, Tracey L; Magee, Michelle; Murray, Jade M; Gordon, Christopher J; Lovato, Nicole; Kennaway, David J; Gwini, Stella M; Bartlett, Delwyn J; Lockley, Steven W; Lack, Leon C; Grunstein, Ronald R; Rajaratnam, Shantha M W

    2018-06-01

    Delayed Sleep-Wake Phase Disorder (DSWPD) is characterised by sleep initiation insomnia when attempting sleep at conventional times and difficulty waking at the required time for daytime commitments. Although there are published therapeutic guidelines for the administration of melatonin for DSWPD, to our knowledge, randomised controlled trials are lacking. This trial tested the efficacy of 0.5 mg melatonin, combined with behavioural sleep-wake scheduling, for improving sleep initiation in clinically diagnosed DSWPD patients with a delayed endogenous melatonin rhythm relative to patient-desired (or -required) bedtime (DBT). This randomised, placebo-controlled, double-blind clinical trial was conducted in an Australian outpatient DSWPD population. Following 1-wk baseline, clinically diagnosed DSWPD patients with delayed melatonin rhythm relative to DBT (salivary dim light melatonin onset [DLMO] after or within 30 min before DBT) were randomised to 4-wk treatment with 0.5 mg fast-release melatonin or placebo 1 h before DBT for at least 5 consecutive nights per week. All patients received behavioural sleep-wake scheduling, consisting of bedtime scheduled at DBT. The primary outcome was actigraphic sleep onset time. Secondary outcomes were sleep efficiency in the first third of time in bed (SE T1) on treatment nights, subjective sleep-related daytime impairment (Patient Reported Outcomes Measurement Information System [PROMIS]), PROMIS sleep disturbance, measures of daytime sleepiness, clinician-rated change in illness severity, and DLMO time. Between September 13, 2012 and September 1, 2014, 307 participants were registered; 116 were randomised to treatment (intention-to-treat n = 116; n = 62 males; mean age, 29.0 y). Relative to baseline and compared to placebo, sleep onset occurred 34 min earlier (95% confidence interval [CI] -60 to -8) in the melatonin group. SE T1 increased; PROMIS sleep-related impairment, PROMIS sleep disturbance, insomnia severity, and functional disability decreased; and a greater proportion of patients showed more than minimal clinician-rated improvement following melatonin treatment (52.8%) compared to placebo (24.0%) (P < 0.05). The groups did not differ in the number of nights treatment was taken per protocol. Post-treatment DLMO assessed in a subset of patients (n = 43) was not significantly different between groups. Adverse events included light-headedness, daytime sleepiness, and decreased libido, although rates were similar between treatment groups. The clinical benefits or safety of melatonin with long-term treatment were not assessed, and it remains unknown whether the same treatment regime would benefit patients experiencing DSWPD sleep symptomology without a delay in the endogenous melatonin rhythm. In this study, melatonin treatment 1 h prior to DBT combined with behavioural sleep-wake scheduling was efficacious for improving objective and subjective measures of sleep disturbances and sleep-related impairments in DSWPD patients with delayed circadian phase relative to DBT. Improvements were achieved largely through the sleep-promoting effects of melatonin, combined with behavioural sleep-wake scheduling. This trial was registered with the Australian New Zealand Clinical Trials Registry, ACTRN12612000425897.

  11. Routing and Scheduling Algorithms for WirelessHART Networks: A Survey

    PubMed Central

    Nobre, Marcelo; Silva, Ivanovitch; Guedes, Luiz Affonso

    2015-01-01

    Wireless communication is a trend nowadays for the industrial environment. A number of different technologies have emerged as solutions satisfying strict industrial requirements (e.g., WirelessHART, ISA100.11a, WIA-PA). As the industrial environment presents a vast range of applications, adopting an adequate solution for each case is vital to obtain good performance of the system. In this context, the routing and scheduling schemes associated with these technologies have a direct impact on important features, like latency and energy consumption. This situation has led to the development of a vast number of routing and scheduling schemes. In the present paper, we focus on the WirelessHART technology, emphasizing its most important routing and scheduling aspects in order to guide both end users and the developers of new algorithms. Furthermore, we provide a detailed literature review of the newest routing and scheduling techniques for WirelessHART, discussing each of their features. These routing algorithms have been evaluated in terms of their objectives, metrics, the usage of the WirelessHART structures and validation method. In addition, the scheduling algorithms were also evaluated by metrics, validation, objectives and, in addition, by multiple superframe support, as well as by the redundancy method used. Moreover, this paper briefly presents some insights into the main WirelessHART simulation modules available, in order to provide viable test platforms for the routing and scheduling algorithms. Finally, some open issues in WirelessHART routing and scheduling algorithms are discussed. PMID:25919371

  12. MIP Models and Hybrid Algorithms for Simultaneous Job Splitting and Scheduling on Unrelated Parallel Machines

    PubMed Central

    Ozmutlu, H. Cenk

    2014-01-01

    We developed mixed integer programming (MIP) models and hybrid genetic-local search algorithms for the scheduling problem of unrelated parallel machines with job sequence and machine-dependent setup times and with job splitting property. The first contribution of this paper is to introduce novel algorithms which make splitting and scheduling simultaneously with variable number of subjobs. We proposed simple chromosome structure which is constituted by random key numbers in hybrid genetic-local search algorithm (GAspLA). Random key numbers are used frequently in genetic algorithms, but it creates additional difficulty when hybrid factors in local search are implemented. We developed algorithms that satisfy the adaptation of results of local search into the genetic algorithms with minimum relocation operation of genes' random key numbers. This is the second contribution of the paper. The third contribution of this paper is three developed new MIP models which are making splitting and scheduling simultaneously. The fourth contribution of this paper is implementation of the GAspLAMIP. This implementation let us verify the optimality of GAspLA for the studied combinations. The proposed methods are tested on a set of problems taken from the literature and the results validate the effectiveness of the proposed algorithms. PMID:24977204

  13. Using All-Sky Imaging to Improve Telescope Scheduling (Abstract)

    NASA Astrophysics Data System (ADS)

    Cole, G. M.

    2017-12-01

    (Abstract only) Automated scheduling makes it possible for a small telescope to observe a large number of targets in a single night. But when used in areas which have less-than-perfect sky conditions such automation can lead to large numbers of observations of clouds and haze. This paper describes the development of a "sky-aware" telescope automation system that integrates the data flow from an SBIG AllSky340c camera with an enhanced dispatch scheduler to make optimum use of the available observing conditions for two highly instrumented backyard telescopes. Using the minute-by-minute time series image stream and a self-maintained reference database, the software maintains a file of sky brightness, transparency, stability, and forecasted visibility at several hundred grid positions. The scheduling software uses this information in real time to exclude targets obscured by clouds and select the best observing task, taking into account the requirements and limits of each instrument.

  14. Sociodemographic profile and predictors of outpatient clinic attendance among HIV-positive patients initiating antiretroviral therapy in Selangor, Malaysia.

    PubMed

    Abdulrahman, Surajudeen Abiola; Rampal, Lekhraj; Othman, Norlijah; Ibrahim, Faisal; Hayati, Kadir Shahar; Radhakrishnan, Anuradha P

    2017-01-01

    Inconsistent literature evidence suggests that sociodemographic, economic, and system- and patient-related factors are associated with clinic attendance among the HIV-positive population receiving antiretroviral therapy (ART) around the world. We examined the factors that predict outpatient clinic attendance among a cohort of HIV-positive patients initiating ART in Selangor, Malaysia. This cross-sectional study analyzed secondary data on outpatient clinic attendance and sociodemographic, economic, psychosocial, and patient-related factors among 242 adult Malaysian patients initiating ART in Selangor, Malaysia. Study cohort was enrolled in a parent randomized controlled trial (RCT) in Hospital Sungai Buloh Malaysia between January and December 2014, during which peer counseling, medication, and clinic appointment reminders were provided to the intervention group through short message service (SMS) and telephone calls for 24 consecutive weeks. Data on outpatient clinic attendance were extracted from the hospital electronic medical records system, while other patient-level data were extracted from pre-validated Adult AIDS Clinical Trial Group (AACTG) adherence questionnaires in which primary data were collected. Outpatient clinic attendance was categorized into binary outcome - regular attendee and defaulter categories - based on the number of missed scheduled outpatient clinic appointments within a 6-month period. Multivariate regression models were fitted to examine predictors of outpatient clinic attendance using SPSS version 22 and R software. A total of 224 (93%) patients who completed 6-month assessment were included in the model. Out of those, 42 (18.7%) defaulted scheduled clinic attendance at least once. Missed appointments were significantly more prevalent among females (n=10, 37.0%), rural residents (n=10, 38.5%), and bisexual respondents (n=8, 47.1%). Multivariate binary logistic regression analysis showed that Indian ethnicity (adjusted odds ratio [AOR] =0.235; 95% CI [0.063-0.869]; P =0.030) and heterosexual orientation (AOR =4.199; 95% CI [1.040-16.957]; P =0.044) were significant predictors of outpatient clinic attendance among HIV-positive patients receiving ART in Malaysia. Ethnicity and sexual orientation of Malaysian patients may play a significant role in their level of adherence to scheduled clinic appointments. These factors should be considered during collaborative adherence strategy planning at ART initiation.

  15. The immunopathogenesis of flea allergy dermatitis in dogs, an experimental study.

    PubMed

    Wilkerson, Melinda J; Bagladi-Swanson, Mary; Wheeler, David W; Floyd-Hawkins, Kim; Craig, Carol; Lee, Kenneth W; Dryden, Michael

    2004-06-01

    In this study, we investigated the development of clinical disease and immune responses in the development of an experimental model of flea allergy dermatitis. Dogs were randomly divided into four treatment groups and were infested with fleas on two different feeding schedules (continuous and episodic). Group 1 consisted of four non-exposed dogs (negative controls) and Group 2 consisted of six dogs exposed to fleas continually. Groups 3 and 4 consisted of 14 dogs each that were exposed to fleas on an episodic schedule (two consecutive days every other week for 12 weeks). Group 4 also received intraperitoneal injections of a low dose of lectin (ricin) with immunomodulatory properties. The purpose of Group 4 was to investigate the effects of ricin on enhancing the development of clinical signs, flea antigen-specific IgE levels and altering the number of CD4+ and CD8+ T cell subsets in peripheral blood. Clinical signs developed in all flea exposed dogs, however, the dermatology lesion scores were less and shorter in duration for continuously exposed dogs compared to episodic exposed dogs, independent of ricin treatment. Lesion development was concentrated in the flea triangle and consisted principally of erythema, followed by alopecia, excoriation, papules, and crusts. CD4+ and CD8+ lymphocyte subsets or IgE levels were not altered by ricin treatment. Flea antigen-specific IgE values were highest in dogs exposed to fleas on a continuous basis compared to those episodically exposed. A greater percentage of clinical responder dogs with negative flea-specific IgE titers or negative intradermal test (IDT) were present in the episodic exposure groups than in the continuous exposure group. IgE titers corresponded slightly better with clinical responders than the IDT. The agreement between the IgE titers and IDT was good (weighted K = 0.67). Histopathology of skin samples were consistent with a Type I hypersensitivity. In conclusion, we were able to develop a model of flea allergy dermatitis by experimentally exposing dogs to fleas on an episodic and continuous feeding schedule. In this study, continuously exposed dogs did not develop immunotolerance, and ricin did not enhance the development of FAD. Copyright 2004 Elsevier B.V.

  16. A Mechanized Decision Support System for Academic Scheduling.

    DTIC Science & Technology

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  17. Recommended Immunization Schedules for Persons Aged 0 through 18 Years--United States, 2010. Morbidity and Mortality Weekly Report QuickGuide. Volume 58, Number 51 & 52

    ERIC Educational Resources Information Center

    Centers for Disease Control and Prevention, 2010

    2010-01-01

    The Advisory Committee on Immunization Practices (ACIP) annually publishes an immunization schedule for persons aged 0 through 18 years that summarizes recommendations for currently licensed vaccines for children aged 18 years and younger and includes recommendations in effect as of December 15, 2009. The changes to the previous schedule are…

  18. 14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...

  19. 14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...

  20. 14 CFR 291.44 - BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other than Jet A fuel, a footnote shall be added indicating the number of gallons and applicable costs... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false BTS Schedule P-12(a), Fuel Consumption by... TRANSPORTATION Reporting Rules § 291.44 BTS Schedule P-12(a), Fuel Consumption by Type of Service and Entity. (a...

  1. Estimating the right allocation of resources on weekends and public holidays in Green Zone using hybrid methods

    NASA Astrophysics Data System (ADS)

    Yusoff, Nazhatul Sahima Mohd; Liong, Choong-Yeun; Ismail, Wan Rosmanira; Noh, Abu Yazid Md; Noor, Nur Amalina Mohd

    2018-04-01

    Long patient waiting time and congestion is a major problem faced by Green Zone in Emergency Department at Hospital Universiti Sains Malaysia (EDHUSM) especially during weekends and public holidays. Even though the Green Zone is servicing only the non-critical patients, patient waiting time, causing the department fails to achieve its Key Performance Indicator (KPI). The long waiting time is due to the insufficient resources provided during the weekends and public holidays versus the large number of patients. Currently, only two doctors supported by two nurses are scheduled for every shift during weekends and public holidays. The numbers of patients are higher during weekends and public holidays as compared to weekdays, but the scheduled number of doctors and nurses are the same as weekdays. Therefore, this study presents a hybrid method to estimate the right number of doctors and nurses for improving the services of the Green Zone during weekends and public holidays. Fifty scenarios based on current and proposed schedules of doctors and nurses are simulated and analysed using the hybrid method of Discrete Event Simulation (DES) and Data Envelopment Analysis (DEA). Banker, Charnes and Cooper (BCC) input-oriented model and Super-Efficiency models of DEA were used to analyse the efficiency of the scenarios. The results show that the best schedule is a combination of four doctors supported by four nurses in every shift during weekends and public holidays for the Green Zone. The findings show that such schedule will not only help the department to achieve its KPI but also enable a more optimal utilization of the resources.

  2. Efficient Computation of Separation-Compliant Speed Advisories for Air Traffic Arriving in Terminal Airspace

    NASA Technical Reports Server (NTRS)

    Sadovsky, Alexander V.; Davis, Damek; Isaacson, Douglas R.

    2012-01-01

    A class of problems in air traffic management asks for a scheduling algorithm that supplies the air traffic services authority not only with a schedule of arrivals and departures, but also with speed advisories. Since advisories must be finite, a scheduling algorithm must ultimately produce a finite data set, hence must either start with a purely discrete model or involve a discretization of a continuous one. The former choice, often preferred for intuitive clarity, naturally leads to mixed-integer programs, hindering proofs of correctness and computational cost bounds (crucial for real-time operations). In this paper, a hybrid control system is used to model air traffic scheduling, capturing both the discrete and continuous aspects. This framework is applied to a class of problems, called the Fully Routed Nominal Problem. We prove a number of geometric results on feasible schedules and use these results to formulate an algorithm that attempts to compute a collective speed advisory, effectively finite, and has computational cost polynomial in the number of aircraft. This work is a first step toward optimization and models refined with more realistic detail.

  3. A Prospective, Matched Comparison Study of SUV Measurements From Time-of-Flight Versus Non-Time-of-Flight PET/CT Scanners.

    PubMed

    Thompson, Holly M; Minamimoto, Ryogo; Jamali, Mehran; Barkhodari, Amir; von Eyben, Rie; Iagaru, Andrei

    2016-07-01

    As quantitative F-FDG PET numbers and pooling of results from different PET/CT scanners become more influential in the management of patients, it becomes imperative that we fully interrogate differences between scanners to fully understand the degree of scanner bias on the statistical power of studies. Participants with body mass index (BMI) greater than 25, scheduled on a time-of-flight (TOF)-capable PET/CT scanner, had a consecutive scan on a non-TOF-capable PET/CT scanner and vice versa. SUVmean in various tissues and SUVmax of malignant lesions were measured from both scans, matched to each subject. Data were analyzed using a mixed-effects model, and statistical significance was determined using equivalence testing, with P < 0.05 being significant. Equivalence was established in all baseline organs, except the cerebellum, matched per patient between scanner types. Mixed-effects method analysis of lesions, repeated between scan types and matched per patient, demonstrated good concordance between scanner types. Patients could be scanned on either a TOF or non-TOF-capable PET/CT scanner without clinical compromise to quantitative SUV measurements.

  4. A systematic review of the sleep, sleepiness, and performance implications of limited wake shift work schedules.

    PubMed

    Short, Michelle A; Agostini, Alexandra; Lushington, Kurt; Dorrian, Jillian

    2015-09-01

    The aim of this review was to identify which limited wake shift work schedules (LWSW) best promote sleep, alertness, and performance. LWSW are fixed work/rest cycles where the time-at-work does is ≤8 hours and there is >1 rest period per day, on average, for ≥2 consecutive days. These schedules are commonly used in safety-critical industries such as transport and maritime industries. Literature was sourced using PubMed, Embase, PsycInfo, Scopus, and Google Scholar databases. We identified 20 independent studies (plus a further 2 overlapping studies), including 5 laboratory and 17 field-based studies focused on maritime watch keepers, ship bridge officers, and long-haul train drivers. The measurement of outcome measures was varied, incorporating subjective and objective measures of sleep: sleep diaries (N=5), actigraphy (N=4), and polysomnography, (N=3); sleepiness: Karolinska Sleepiness Scale (N=5), visual analog scale (VAS) alertness (N=2) and author-derived measures (N=2); and performance: Psychomotor Vigilance Test (PVT) (N=5), Reaction Time or Vigilance tasks (N=4), Vector and Letter Cancellation Test (N=1), and subjective performance (N=2). Of the three primary rosters examined (6 hours-on/6 hours-off, 8 hours-on/8 hours-off and 4 hours-on/8 hours-off), the 4 hours-on/8 hours-off roster was associated with better sleep and lower levels of sleepiness. Individuals working 4 hours-on/8 hours-off rosters averaged 1 hour more sleep per night than those working 6 hours-on/6 hours-off and 1.3 hours more sleep than those working 8 hours-on/8 hours-off (P<0.01). More broadly, findings indicate that LWSW schedules were associated with better sleep and lower sleepines in the case of (i) shorter time-at-work, (ii) more frequent rest breaks, (iii) shifts that start and end at the same clock time every 24 hours, and (iv) work shifts commencing in the daytime (as opposed to night). The findings for performance remain incomplete due to the small number of studies containing a performance measure and the heterogeneity of performance measures within those that did. The literature supports the utility of LWSW in industries where individuals sleep at or near the workplace as they facilitate at least some sleep during the biological night and minimize deficits associated with time-on-shift with shorter shifts. Overall, the 4 hour-on/8 hour-off roster best promoted sleep and minimized sleepiness compared to other LWSW schedules. Nevertheless, and considering the safety-critical nature of industries which employ LWSW, the limited literature needs to be greatly expanded with specific focus on the consequences for performance and comparison to mainstream rosters.

  5. A neural network approach to job-shop scheduling.

    PubMed

    Zhou, D N; Cherkassky, V; Baldwin, T R; Olson, D E

    1991-01-01

    A novel analog computational network is presented for solving NP-complete constraint satisfaction problems, i.e. job-shop scheduling. In contrast to most neural approaches to combinatorial optimization based on quadratic energy cost function, the authors propose to use linear cost functions. As a result, the network complexity (number of neurons and the number of resistive interconnections) grows only linearly with problem size, and large-scale implementations become possible. The proposed approach is related to the linear programming network described by D.W. Tank and J.J. Hopfield (1985), which also uses a linear cost function for a simple optimization problem. It is shown how to map a difficult constraint-satisfaction problem onto a simple neural net in which the number of neural processors equals the number of subjobs (operations) and the number of interconnections grows linearly with the total number of operations. Simulations show that the authors' approach produces better solutions than existing neural approaches to job-shop scheduling, i.e. the traveling salesman problem-type Hopfield approach and integer linear programming approach of J.P.S. Foo and Y. Takefuji (1988), in terms of the quality of the solution and the network complexity.

  6. Scheduling for Locality in Shared-Memory Multiprocessors

    DTIC Science & Technology

    1993-05-01

    Submitted in Partial Fulfillment of the Requirements for the Degree ’)iIC Q(JALfryT INSPECTED 5 DOCTOR OF PHILOSOPHY I Accesion For Supervised by NTIS CRAM... architecture on parallel program performance, explain the implications of this trend on popular parallel programming models, and propose system software to 0...decomoosition and scheduling algorithms. I. SUIUECT TERMS IS. NUMBER OF PAGES shared-memory multiprocessors; architecture trends; loop 110 scheduling

  7. Optimal Scheduling of Time-Shiftable Electric Loads in Expeditionary Power Grids

    DTIC Science & Technology

    2015-09-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS OPTIMAL SCHEDULING OF TIME-SHIFTABLE ELECTRIC LOADS IN EXPEDITIONARY POWER GRIDS by John G...to 09-25-2015 4. TITLE AND SUBTITLE OPTIMAL SCHEDULING OF TIME-SHIFTABLE ELECTRIC LOADS IN EXPEDI- TIONARY POWER GRIDS 5. FUNDING NUMBERS 6. AUTHOR(S...eliminate unmanaged peak demand, reduce generator peak-to-average power ratios, and facilitate a persistent shift to higher fuel efficiency. Using

  8. On-Line Data Reconstruction in Redundant Disk Arrays.

    DTIC Science & Technology

    1994-05-01

    each sale, - file servers that support a large number of clients with differing work schedules , and * automated teller networks in banking systems...24KB Head scheduling : FIFO User data layout: Sequential in address space of array Disk spindles: Synchronized Table 2.2: Default array parameters for...package and a set of scheduling and queueing routines. 2.3.3. Default workload This dissertation reports on many performance evaluations. In order to

  9. Optimally Scheduling Basic Courses at the Defense Language Institute using Integer Programming

    DTIC Science & Technology

    2005-09-01

    DLI’s manual schedules at best can train 8%, 7% and 64%. 15. NUMBER OF PAGES 59 14. SUBJECT TERMS Operations Research, Linear Programming...class in 2006, 2007, and 2008, whereas DLI’s manual schedules at best can train 8%, 7% and 64%. vi THIS PAGE...ARABIC INSTRUTOR LEVELS .....................................25 FIGURE 2. OCS1 AND OCS2 CHINESE-MANDARIN INSTRUTOR LEVELS ............26 FIGURE 3

  10. A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry

    NASA Astrophysics Data System (ADS)

    Wang, Li-Chih; Chen, Yin-Yann; Chen, Tzu-Li; Cheng, Chen-Yang; Chang, Chin-Wei

    2014-10-01

    This paper studies a solar cell industry scheduling problem, which is similar to traditional hybrid flowshop scheduling (HFS). In a typical HFS problem, the allocation of machine resources for each order should be scheduled in advance. However, the challenge in solar cell manufacturing is the number of machines that can be adjusted dynamically to complete the job. An optimal production scheduling model is developed to explore these issues, considering the practical characteristics, such as hybrid flowshop, parallel machine system, dedicated machines, sequence independent job setup times and sequence dependent job setup times. The objective of this model is to minimise the makespan and to decide the processing sequence of the orders/lots in each stage, lot-splitting decisions for the orders and the number of machines used to satisfy the demands in each stage. From the experimental results, lot-splitting has significant effect on shortening the makespan, and the improvement effect is influenced by the processing time and the setup time of orders. Therefore, the threshold point to improve the makespan can be identified. In addition, the model also indicates that more lot-splitting approaches, that is, the flexibility of allocating orders/lots to machines is larger, will result in a better scheduling performance.

  11. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  12. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  13. Designing a fuzzy scheduler for hard real-time systems

    NASA Technical Reports Server (NTRS)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  14. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  15. Alternative scheduling models and their effect on science achievement at the high school level

    NASA Astrophysics Data System (ADS)

    Dostal, Jay Roland

    This study will evaluate alternative scheduling methods implemented in secondary level schools. Students were selected based on parent selection of programs. Traditional scheduling involves numerous academic subjects with small increments of time in each class and block scheduling focuses on fewer academic subjects and more instructional time. This study will compare office referral numbers, absence frequency, and Essential Learner Outcome (ELO) science strand scores in the 8th-grade (pretest) to the same students office referrals, absence frequency, and ELO science strand scores in the 11th-grade (posttest) between Seven Period Traditional Scheduling (SPTS) and Four Period Block Scheduling (FPBS) in the hopes that no matter what schedule students are a part of, the achievement results will be similar. (Study participants had completed both grade level ELO assessments and were continuously enrolled in one high school through their junior year.

  16. Daytime Sleepiness Increases With Age in Early Adolescence: A Sleep Restriction Dose-Response Study.

    PubMed

    Campbell, Ian G; Burright, Christopher S; Kraus, Amanda M; Grimm, Kevin J; Feinberg, Irwin

    2017-05-01

    Daytime sleepiness increases across adolescence. This increase is commonly attributed to insufficient sleep durations resulting from increasingly limited time in bed. We tested the effects of 3 sleep schedules on daytime sleepiness and whether these effects changed with age in early adolescence. In 77 children ranging in age from 9.9 to 14 years, objective (multiple sleep latency test [MSLT]) and subjective (Karolinska sleepiness scale [KSS]) sleepiness was measured following 4 consecutive nights of either 7, 8.5, or 10 hours in bed. All participants completed all 3 sleep schedules. The order in which they completed the schedules was not randomized but was accounted for in all statistical analyses. Time in bed restriction decreased sleep duration and increased objective and subjective daytime sleepiness. Although the sleep durations did not change with age, the likelihood of falling asleep during the MSLT increased with age. Nevertheless, sleep restriction produced a greater increase in MSLT-measured sleepiness in younger participants. Subjective sleepiness measured with the KSS increased with shorter sleep duration, but this effect did not change with age. Increasing objective daytime sleepiness in early adolescence cannot simply be attributed to reduced sleep due to restricted sleep schedules. We propose that some of the increased daytime sleepiness of adolescents is a consequence of adolescent brain reorganization driven by synaptic pruning which decreases the intensity of waking brain activity. © Sleep Research Society 2017. Published by Oxford University Press on behalf of the Sleep Research Society. All rights reserved. For permissions, please e-mail journals.permissions@oup.com.

  17. A work-for-food enrichment program increases exploration and decreases stereotypies in four species of bears.

    PubMed

    Wagman, Jason D; Lukas, Kristen E; Dennis, Patricia M; Willis, Mark A; Carroscia, Joe; Gindlesperger, Curt; Schook, Mandi W

    2018-01-01

    Zoo-housed bears are prone to exhibiting stereotypic behaviors, generally considered indicators of negative welfare. We explored the effects of a variable-time feeding enrichment schedule on behavioral indicators of welfare in four bear species at Cleveland Metroparks Zoo. We distributed the diets of eight bears in one of five enrichment items, for two consecutive days each, and monitored behavior throughout the day. In Experiment 1, we compared variable-time to fixed-time presentation of enrichment over two, 10-day periods. Overall, bears performed more exploratory behavior when enriched (p < 0.0001). Furthermore, variable-time enrichment was associated with a greater increase in exploratory behavior than fixed-time enrichment when compared to baseline (p < 0.001). Both fixed-time (p unadjusted <0.05, p adjusted = 0.07) and variable-schedule (p unadjusted <0.05, p adjusted = 0.09) enrichment were also associated with similar decreases in abnormal behavior compared to baseline. For Experiment 2, we tested habituation to enrichment over 30 days using multiple items and a semi-variable presentation schedule. Again during the enrichment period, bears exhibited increased exploratory behavior (p < 0.0001) and decreased abnormal behaviors compared to baseline (p unadjusted = 0.05, p adjusted = 0.09). We observed no habituation during the 30-day sustained enrichment period for these behaviors. Collectively, these results suggest that daily, variable-schedule feeding enrichment, with intermittent presentation of unique enrichment items, increases behavioral indicators of positive welfare and decreases behavioral indicators of negative welfare. © 2018 Wiley Periodicals, Inc.

  18. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    NASA Astrophysics Data System (ADS)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  19. 75 FR 76978 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... (Renewal), EPA ICR Number 1078.09, OMB Control Number 2060-0111 AGENCY: Environmental Protection Agency... Numbers: EPA ICR Number 1078.09, OMB Control Number 2060-0111. ICR Status: This ICR is scheduled to expire...

  20. 75 FR 1054 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... (Renewal); EPA ICR Number 1128.09, OMB Control Number 2060-0080 AGENCY: Environmental Protection Agency... Numbers: EPA ICR Number 1128.09, OMB Control Number 2060-0080. ICR Status: This ICR is scheduled to expire...

  1. 75 FR 19382 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... Cleaners (Renewal), EPA ICR Number 1652.07, OMB Control Number 2060- 0273 AGENCY: Environmental Protection...). ICR Numbers: EPA ICR Number 1652.07, OMB Control Number 2060-0273. ICR Status: This ICR is scheduled...

  2. Optimizing The Scheduling Of Recruitment And Initial Training For Soldiers In The Australian Army

    DTIC Science & Technology

    2016-03-01

    SCHEDULING OF RECRUITMENT AND INITIAL TRAINING FOR SOLDIERS IN THE AUSTRALIAN ARMY by Melissa T. Joy March 2016 Thesis Advisor: Kenneth...SOLDIERS IN THE AUSTRALIAN ARMY 5. FUNDING NUMBERS 6. AUTHOR(S) Melissa T. Joy 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval...This thesis develops a master scheduling program to optimize recruitment into the Australian Army by employment category. The goal of the model

  3. Protocol, Engineering Research Center, University of California, Santa Barbara

    DTIC Science & Technology

    2005-12-01

    minimizing the energy consumption in idle periods. We have designed an asynchronous wakeup schedule based on the theory of block designs. The idea is...performance of ad hoc networks through innovative packet scheduling (Baker). "* Developed a number of novel schemes to ensure loop freedom in on demand routing...network nodes to schedule their transmissions to avoid collisions (Garcia-Luna-Aceves). "* Designed and analyzed the Hybrid Activation Multiple Access (HAMA

  4. An Analysis of Shuttle Crew Scheduling Violations

    NASA Technical Reports Server (NTRS)

    Bristol, Douglas

    2012-01-01

    From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

  5. Application of the Linux cluster for exhaustive window haplotype analysis using the FBAT and Unphased programs.

    PubMed

    Mishima, Hiroyuki; Lidral, Andrew C; Ni, Jun

    2008-05-28

    Genetic association studies have been used to map disease-causing genes. A newly introduced statistical method, called exhaustive haplotype association study, analyzes genetic information consisting of different numbers and combinations of DNA sequence variations along a chromosome. Such studies involve a large number of statistical calculations and subsequently high computing power. It is possible to develop parallel algorithms and codes to perform the calculations on a high performance computing (HPC) system. However, most existing commonly-used statistic packages for genetic studies are non-parallel versions. Alternatively, one may use the cutting-edge technology of grid computing and its packages to conduct non-parallel genetic statistical packages on a centralized HPC system or distributed computing systems. In this paper, we report the utilization of a queuing scheduler built on the Grid Engine and run on a Rocks Linux cluster for our genetic statistical studies. Analysis of both consecutive and combinational window haplotypes was conducted by the FBAT (Laird et al., 2000) and Unphased (Dudbridge, 2003) programs. The dataset consisted of 26 loci from 277 extended families (1484 persons). Using the Rocks Linux cluster with 22 compute-nodes, FBAT jobs performed about 14.4-15.9 times faster, while Unphased jobs performed 1.1-18.6 times faster compared to the accumulated computation duration. Execution of exhaustive haplotype analysis using non-parallel software packages on a Linux-based system is an effective and efficient approach in terms of cost and performance.

  6. Application of the Linux cluster for exhaustive window haplotype analysis using the FBAT and Unphased programs

    PubMed Central

    Mishima, Hiroyuki; Lidral, Andrew C; Ni, Jun

    2008-01-01

    Background Genetic association studies have been used to map disease-causing genes. A newly introduced statistical method, called exhaustive haplotype association study, analyzes genetic information consisting of different numbers and combinations of DNA sequence variations along a chromosome. Such studies involve a large number of statistical calculations and subsequently high computing power. It is possible to develop parallel algorithms and codes to perform the calculations on a high performance computing (HPC) system. However, most existing commonly-used statistic packages for genetic studies are non-parallel versions. Alternatively, one may use the cutting-edge technology of grid computing and its packages to conduct non-parallel genetic statistical packages on a centralized HPC system or distributed computing systems. In this paper, we report the utilization of a queuing scheduler built on the Grid Engine and run on a Rocks Linux cluster for our genetic statistical studies. Results Analysis of both consecutive and combinational window haplotypes was conducted by the FBAT (Laird et al., 2000) and Unphased (Dudbridge, 2003) programs. The dataset consisted of 26 loci from 277 extended families (1484 persons). Using the Rocks Linux cluster with 22 compute-nodes, FBAT jobs performed about 14.4–15.9 times faster, while Unphased jobs performed 1.1–18.6 times faster compared to the accumulated computation duration. Conclusion Execution of exhaustive haplotype analysis using non-parallel software packages on a Linux-based system is an effective and efficient approach in terms of cost and performance. PMID:18541045

  7. The effectiveness of policy changes designed to increase the attendance rate for outpatient retinopathy of prematurity (ROP) screening examinations.

    PubMed

    Barry, Gerard P; Tauber, Kate; Emmanuel, Gregory; Horgan, Michael J; Simon, John W

    2013-06-01

    To determine the effectiveness of a series of policy changes designed to increase the attendance rate for outpatient retinopathy of prematurity (ROP) screening examinations. We retrospectively reviewed the records of consecutive neonatal intensive care unit patients before and after the implementation of policy changes. Policy changes included parent education forms, streamlined scheduling, and creation of a log for all patients seen. The primary outcome measure was attendance rates for the first outpatient appointment after discharge. The Fisher exact test was used to compare rates between the two groups. Before the policy was implemented, 22 of 52 (42%) neonates and their caregivers attended their first outpatient ROP screening examination on the recommended date. This rate improved significantly after policy implementation, when 46 of 57 (81%) neonates and their caregivers were seen on the recommended date (P < 0.01). The number of patients who ultimately met the criteria for conclusion of acute retinal screening examinations also significantly improved, from 47 of 52 (90%) of neonates in the pre-implementation group to 57 of 57 (100%) in the post-implementation group (P = 0.02). The attendance rates for initial outpatient ROP examinations and the number of patients who ultimately met criteria for conclusion of acute retinal screening examinations significantly improved after the implementation of new policies. Copyright © 2013 American Association for Pediatric Ophthalmology and Strabismus. Published by Mosby, Inc. All rights reserved.

  8. Feasibility of outpatient total hip and knee arthroplasty in unselected patients

    PubMed Central

    Gromov, Kirill; Kjærsgaard-Andersen, Per; Revald, Peter; Kehlet, Henrik; Husted, Henrik

    2017-01-01

    Background and purpose The number of patients who are suitable for outpatient total hip and knee arthroplasty (THA and TKA) in an unselected patient population remains unknown. The purpose of this prospective 2-center study was to identify the number of patients suitable for outpatient THA and TKA in an unselected patient population, to investigate the proportion of patients who were discharged on the day of surgery (DOS), and to identify reasons for not being discharged on the DOS. Patients and methods All consecutive, unselected patients who were referred to 2 participating centers and who were scheduled for primary THA and TKA were screened for eligibility for outpatient surgery with discharge to home on DOS. If patients did not fulfill the discharge criteria, the reasons preventing discharge were noted. Odds factors with relative risk intervals for not being discharged on DOS were identified while adjusting for age, sex, ASA score, BMI and distance to home. Results Of the 557 patients who were referred to the participating surgeons during the study period, 54% were potentially eligible for outpatient surgery. Actual DOS discharge occurred in 13–15% of the 557 patients. Female sex and surgery late in the day increased the odds of not being discharged on the DOS. Interpretation This study shows that even in unselected THA and TKA patients, same-day discharge is feasible in about 15% of patients. Future studies should evaluate safety aspects and economic benefits. PMID:28426262

  9. Investigating the Contextual Interference Effect Using Combination Sports Skills in Open and Closed Skill Environments

    PubMed Central

    Cheong, Jadeera P.G.; Lay, Brendan; Razman, Rizal

    2016-01-01

    This study attempted to present conditions that were closer to the real-world setting of team sports. The primary purpose was to examine the effects of blocked, random and game-based training practice schedules on the learning of the field hockey trap, close dribble and push pass that were practiced in combination. The secondary purpose was to investigate the effects of predictability of the environment on the learning of field hockey sport skills according to different practice schedules. A game-based training protocol represented a form of random practice in an unstable environment and was compared against a blocked and a traditional random practice schedule. In general, all groups improved dribble and push accuracy performance during the acquisition phase when assessed in a closed environment. In the retention phase, there were no differences between the three groups. When assessed in an open skills environment, all groups improved their percentage of successful executions for trapping and passing execution, and improved total number of attempts and total number of successful executions for both dribbling and shooting execution. Between-group differences were detected for dribbling execution with the game-based group scoring a higher number of dribbling successes. The CI effect did not emerge when practicing and assessing multiple sport skills in a closed skill environment, even when the skills were practiced in combination. However, when skill assessment was conducted in a real-world situation, there appeared to be some support for the CI effect. Key points The contextual interference effect was not supported when practicing several skills in combination when the sports skills were assessed in a closed skill environment. There appeared to be some support for the contextual interference effect when sports skills were assessed in an open skill environment, which were similar to a real game situation. A game-based training schedule can be used as an alternative practice schedule as it displayed superior learning compared to a blocked practice schedule when assessed by the game performance test (real-world setting). The game-based training schedule also matched the blocked and random practice schedules in the other tests. PMID:26957940

  10. Investigating the Contextual Interference Effect Using Combination Sports Skills in Open and Closed Skill Environments.

    PubMed

    Cheong, Jadeera P G; Lay, Brendan; Razman, Rizal

    2016-03-01

    This study attempted to present conditions that were closer to the real-world setting of team sports. The primary purpose was to examine the effects of blocked, random and game-based training practice schedules on the learning of the field hockey trap, close dribble and push pass that were practiced in combination. The secondary purpose was to investigate the effects of predictability of the environment on the learning of field hockey sport skills according to different practice schedules. A game-based training protocol represented a form of random practice in an unstable environment and was compared against a blocked and a traditional random practice schedule. In general, all groups improved dribble and push accuracy performance during the acquisition phase when assessed in a closed environment. In the retention phase, there were no differences between the three groups. When assessed in an open skills environment, all groups improved their percentage of successful executions for trapping and passing execution, and improved total number of attempts and total number of successful executions for both dribbling and shooting execution. Between-group differences were detected for dribbling execution with the game-based group scoring a higher number of dribbling successes. The CI effect did not emerge when practicing and assessing multiple sport skills in a closed skill environment, even when the skills were practiced in combination. However, when skill assessment was conducted in a real-world situation, there appeared to be some support for the CI effect. Key pointsThe contextual interference effect was not supported when practicing several skills in combination when the sports skills were assessed in a closed skill environment.There appeared to be some support for the contextual interference effect when sports skills were assessed in an open skill environment, which were similar to a real game situation.A game-based training schedule can be used as an alternative practice schedule as it displayed superior learning compared to a blocked practice schedule when assessed by the game performance test (real-world setting). The game-based training schedule also matched the blocked and random practice schedules in the other tests.

  11. The NASA Goddard Group's Source Monitoring Database and Program

    NASA Astrophysics Data System (ADS)

    Gipson, John; Le Bail, Karine; Ma, Chopo

    2014-12-01

    Beginning in 2003, the Goddard VLBI group developed a program to purposefully monitor when sources were observed and to increase the observations of ``under-observed'' sources. The heart of the program consists of a MySQL database that keeps track of, on a session-by-session basis: the number of observations that are scheduled for a source, the number of observations that are successfully correlated, and the number of observations that are used in a session. In addition, there is a table that contains the target number of successful sessions over the last twelve months. Initially this table just contained two categories. Sources in the geodetic catalog had a target of 12 sessions/year; the remaining ICRF-1 defining sources had a target of two sessions/year. All other sources did not have a specific target. As the program evolved, different kinds of sources with different observing targets were added. During the scheduling process, the scheduler has the option of automatically selecting N sources which have not met their target. We discuss the history and present some results of this successful program.

  12. On Distinguishing Progressively Increasing Response Requirements for Reinforcement

    ERIC Educational Resources Information Center

    Jarmolowicz, David P.; Lattal, Kennon A.

    2010-01-01

    Several different arrangements have been described for increasing the response requirements for reinforcement using the label "progressive-ratio schedule." Under the original progressive-ratio schedule, the response requirement is increased after each reinforcer. Subsequently, arrangements have been used in which the number of required responses…

  13. 21 CFR 1303.12 - Procurement quotas.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE QUOTAS Aggregate Production and... substance, and, if a controlled substance listed in any schedule, the schedule number and Administration... Administration. See the Table of DEA Mailing Addresses in § 1321.01 of this chapter for the current mailing...

  14. Integrated production and distribution scheduling problems related to fixed delivery departure dates and weights of late orders.

    PubMed

    Li, Shanlin; Li, Maoqin

    2015-01-01

    We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time.

  15. Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders

    PubMed Central

    Li, Shanlin; Li, Maoqin

    2015-01-01

    We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time. PMID:25785285

  16. A real-time Excel-based scheduling solution for nursing staff reallocation.

    PubMed

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  17. Evaluation of the impact of resident work hour restrictions on resident outpatient clinical experience.

    PubMed

    Patel, Shweta V; Driggers, Rita W; Zahn, Christopher M

    2011-01-01

    To estimate the effect of work hour restrictions on resident outpatient clinical experience. Schedule templates from academic years 1998-1999 (before work hour restrictions), 2002-2003 (when night float rotation was added in anticipation of work hour restrictions), and 2008-2009 (during work hour restrictions) were compared for outpatient clinic experience before and after work hour restrictions were implemented. Actual clinics on specific rotations and estimated patient encounters per scheduled clinic were considered. Between academic year (AY) 1998-1999 and AY 2008-2009 there was a generalized downward trend in average outpatient encounters for postgraduate year (PGY)-2, PGY-3 and PGY-4 residents (45%, 34% and 36%, respectively). For obstetrics, gynecology and ambulatory rotations, there was a downward trend in average outpatient encounters for each rotation type (61%, 14% and 63%, respectively). The average number of scheduled clinics per week was slightly decreased when comparing AY 1998-1999 to either AY 2002-2003 or AY 2008-2009. Rotation schedules before and after work hour restrictions demonstrated a downward trend in the number of scheduled outpatient encounters. These findings indicate a potential negative impact on preparation for clinical practice.

  18. Effects of Differential Reinforcement and Rules With Feedback on Preference for Choice and Verbal Reports

    PubMed Central

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning. PMID:22754103

  19. Effects of differential reinforcement and rules with feedback on preference for choice and verbal reports.

    PubMed

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning.

  20. 75 FR 9408 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... Part 63, Subpart LLL), EPA ICR Number 1801.08, OMB Control Number 2060-0416 AGENCY: Environmental... Numbers: EPA ICR Number 1801.08, OMB Control Number 2060-0416. ICR Status: This ICR is scheduled to expire...

  1. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  2. Cost and Schedule Control Management: What the Department of Defense Major Acquisition System Program Manager Needs to Know

    DTIC Science & Technology

    1992-03-01

    public release; distribution is unlimited. 2b. DECLASSIFICATION/DOWNGRADING SCHEDULE 4. PERFORMING ORGANIZATION REPORT NUMBER( S ) S . MONITORING...ORGANIZATION REPORT NUMBER( S ) Sa. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Naval Postgraduate School (If appikable...PERSONAL AUTHOR( S ) Coutteau, Charles G. 13a. TYPE OF REPORT 1 3b. TIME COVE RED 14. DATE OF REPORT (year, month, day) 1S. PAGE COUNT Master’s TheisI From

  3. The Impact of Consecutive Interpreting Training on the L2 Listening Competence Enhancement

    ERIC Educational Resources Information Center

    Zhang, Tongtong; Wu, Zhiwei

    2017-01-01

    In recent years, a growing number of people have taken up interpreting training, with the intention of not only developing interpreting skills, but improving language proficiency as well. The present study sets out to investigate the impact of English-Chinese consecutive interpreting (CI) training on the enhancement of the second language (L2,…

  4. Defense AT&L (Volume 35, Number 5, September-October 2006)

    DTIC Science & Technology

    2006-10-01

    percent of production. The criti- Defense AT&L: September-October 2006 8 cal path elements driving the IOT &E schedule are not pro- duction hardware...reduced costs, and successful completion of work in the scheduled time. 30 The Commodity Approach to Aircraft Protection Systems Capt. Bill Chubb, USN The...piece of Littoral Combat Ship Two during the ship’s keel laying ceremony. The Navy’s second Littoral Combat Ship is scheduled for commissioning in

  5. Endoscopic sleeve gastroplasty: the learning curve.

    PubMed

    Hill, Christine; El Zein, Mohamad; Agnihotri, Abhishek; Dunlap, Margo; Chang, Angela; Agrawal, Alison; Barola, Sindhu; Ngamruengphong, Saowanee; Chen, Yen-I; Kalloo, Anthony N; Khashab, Mouen A; Kumbhari, Vivek

    2017-09-01

     Endoscopic sleeve gastroplasty (ESG) is gaining traction as a minimally invasive bariatric treatment. Concern that the learning curve may be slow, even among those proficient in endoscopic suturing, is a barrier to widespread implementation of the procedure. Therefore, we aimed to define the learning curve for ESG in a single endoscopist experienced in endoscopic suturing who participated in a 1-day ESG training program.  Consecutive patients who underwent ESG between February 2016 and November 2016 were included. The performing endoscopist, who is proficient in endoscopic suturing for non-ESG procedures, participated in a 1-day ESG training session before offering ESG to patients. The outcome measurements were length of procedure (LOP) and number of plications per procedure. Nonlinear regression was used to determine the learning plateau and calculate the learning rate.  Twenty-one consecutive patients (8 males), with mean age 47.7 ± 11.2 years and mean body mass index 41.8 ± 8.5 kg/m 2 underwent ESG. LOP decreased significantly across consecutive procedures, with a learning plateau at 101.5 minutes and a learning rate of 7 cases ( P  = 0.04). The number of plications per procedure also decreased significantly across consecutive procedures, with a plateau at 8 sutures and a learning rate of 9 cases ( P  < 0.001). Further, the average time per plication decreased significantly with consecutive procedures, reaching a plateau at 9 procedures ( P  < 0.001).  Endoscopists experienced in endoscopic suturing are expected to achieve a reduction in LOP and number of plications per procedure in successive cases, with progress plateauing at 7 and 9 cases, respectively.

  6. The Relationship Between Cost Growth and Schedule Growth

    DTIC Science & Technology

    2003-01-01

    Relationship between Cost Growth and Schedule Growth, 35th DoDCAS, SCEA 2002, Integrated Program Management Conference (IPMC) 2002, R. L. Coleman...currently valid OMB control number. 1. REPORT DATE 2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE The Relationship Between Cost...

  7. 19 CFR 122.31 - Notice of arrival.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... following information: (1) Type of aircraft and registration number; (2) Name (last, first, middle, if... provided in paragraph (b) of this section, all aircraft entering the United States from a foreign area must give advance notice of arrival. (b) Exceptions for scheduled aircraft of a scheduled airline. Advance...

  8. 19 CFR 122.31 - Notice of arrival.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... following information: (1) Type of aircraft and registration number; (2) Name (last, first, middle, if... provided in paragraph (b) of this section, all aircraft entering the United States from a foreign area must give advance notice of arrival. (b) Exceptions for scheduled aircraft of a scheduled airline. Advance...

  9. 19 CFR 122.31 - Notice of arrival.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... following information: (1) Type of aircraft and registration number; (2) Name (last, first, middle, if... provided in paragraph (b) of this section, all aircraft entering the United States from a foreign area must give advance notice of arrival. (b) Exceptions for scheduled aircraft of a scheduled airline. Advance...

  10. A format for the interchange of scheduling models

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1994-01-01

    In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

  11. Multiresource allocation and scheduling for periodic soft real-time applications

    NASA Astrophysics Data System (ADS)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  12. Vectorization of a penalty function algorithm for well scheduling

    NASA Technical Reports Server (NTRS)

    Absar, I.

    1984-01-01

    In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.

  13. 75 FR 21291 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Manufacturing and Phosphate Fertilizers Production (Renewal), EPA ICR Number 1790.05, OMB Control Number 2060... Number 1790.05, OMB Control Number 2060-0361. ICR Status: This ICR is scheduled to expire on June 30...

  14. 75 FR 28605 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... (Renewal), EPA ICR Number 1781.05, OMB Control Number 2060- 0358 AGENCY: Environmental Protection Agency... ICR Number 1781.05, OMB Control Number 2060-0358. ICR Status: This ICR is scheduled to expire on July...

  15. 75 FR 26955 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... ICR Number 1058.10, OMB Control Number 2060-0040 AGENCY: Environmental Protection Agency (EPA). ACTION...: EPA ICR Number 1058.10, OMB Control Number 2060-0040. ICR Status: This ICR is scheduled to expire on...

  16. 75 FR 44236 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ..., Catalytic Cracking, Reforming and Sulfur Units (Renewal); EPA ICR Number 1844.04, OMB Control Number 2060... ICR Number 1844.04, OMB Control Number 2060-0554. ICR Status: This ICR is scheduled to expire on...

  17. 75 FR 48966 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ..., Surface Impoundments and Containers (Renewal), EPA ICR Number 1593.08, OMB Control Number 2060-0318 AGENCY... ICR Number 1593.08, OMB Control Number 2060-0318. ICR Status: This ICR is scheduled to expire on...

  18. Effects of reinforcement value on instruction following under schedules of negative reinforcement.

    PubMed

    Alessandri, Jérôme; Cançado, Carlos R X; Abreu-Rodrigues, Josele

    2017-12-01

    The effects of reinforcement value and social control on instruction following under a negative-reinforcement (escape) schedule were studied. Initially, responding produced timeouts from pressing a force cell under a low and a high force requirement on a fixed-ratio 1 schedule of reinforcement. Next, participants were reexposed to the low and high force requirements, but were instructed that the experimenter expected them to decrease the number of timeouts relative to the previous exposures to the procedure. Even though following the instruction led to a decrease in number of timeouts and to an increase in effort (i.e., was non-efficient), instruction following occurred consistently for each participant and was modulated by reinforcement value. That is, the decrease in the number of timeouts (i.e., instruction following) was lower under the high force requirement than under the low force requirement. These results replicate and extend previous findings that instructions interact with social and nonsocial contingencies in controlling human behavior. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. Differential modulatory effects of cocaine on marmoset monkey recognition memory.

    PubMed

    Melamed, Jonathan L; de Jesus, Fernando M; Aquino, Jéssica; Vannuchi, Clarissa R S; Duarte, Renata B M; Maior, Rafael S; Tomaz, Carlos; Barros, Marilia

    2017-01-01

    Acute and repeated exposure to cocaine alters the cognitive performance of humans and animals. How each administration schedule affects the same memory task has yet to be properly established in nonhuman primates. Therefore, we assessed the performance of marmoset monkeys in a spontaneous object-location (SOL) recognition memory task after acute and repeated exposure to cocaine (COC; 5mg/kg, ip). Two identical neutral stimuli were explored on the 10-min sample trial, after which preferential exploration of the displaced vs the stationary object was analyzed on the 10-min test trial. For the acute treatment, cocaine was given immediately after the sample presentation, and spatial recognition was then tested after a 24-h interval. For the repeated exposure schedule, daily cocaine injections were given on 7 consecutive days. After a 7-day drug-free period, the SOL task was carried out with a 10-min intertrial interval. When given acutely postsample, COC improved the marmosets' recognition memory, whereas it had a detrimental effect after the repeated exposure. Thus, depending on the administration schedule, COC exerted opposing effects on the marmosets' ability to recognize spatial changes. This agrees with recent studies in rodents and the recognition impairment seen in human addicts. Further studies related to the effects of cocaine's acute×prior drug history on the same cognitive domain are warranted. © 2017 Elsevier B.V. All rights reserved.

  20. Effect of antibiotic diversity on ventilator-associated pneumonia caused by ESKAPE Organisms.

    PubMed

    Sandiumenge, Alberto; Lisboa, Thiago; Gomez, Frederic; Hernandez, Pilar; Canadell, Laura; Rello, Jordi

    2011-09-01

    The aim of this study was to test in the clinic whether antimicrobial diversity affects resistance of Enterococcus faecium, Staphylococcus aureus, Klebsiella species, Acinetobacter baumannii, Pseudomonas aeruginosa, and Enterobacter species (ESKAPE) pathogens in ventilator-associated pneumonia (VAP). Three different strategies of empirical antimicrobial prescription for VAP were consecutively implemented in an ICU: patient specific (10 months); scheduling, including sequential quarterly prioritization (12 months) and restriction (12 months) of antimicrobials; and mixing (10 months). Periods were compared, measuring the antimicrobial heterogeneity index (AHI). Incidence and resistance patterns of VAP caused by ESKAPE were compared. Overall, 127 microbiologic VAP episodes were documented. ESKAPE VAP increased significantly during scheduling (AHI, 0.65) compared with patient-specific (AHI, 0.88) and mixing (AHI, 0.87) periods (relative risk, 2.67 and 3.84, respectively). This finding was associated with a significant (P < .05) increase of carbapenem-resistant A baumannii during the scheduling period (15.0%) compared with the patient-specific (2.4%) and mixing (0%) periods. ICU mortality of resistant patients with ESKAPE VAP was doubled that of patients without ESKAPE VAP (relative risk, 2.25; 95% CI, 1.67-9.48). Thirty-day mechanical ventilation-free days was significantly increased (5 days) in patients with resistant ESKAPE VAP. Antibiotic strategies promoting diversity may prevent the emergence of resistance of ESKAPE organisms, improving use of health-care resources.

  1. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  2. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  3. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  4. A method of operation scheduling based on video transcoding for cluster equipment

    NASA Astrophysics Data System (ADS)

    Zhou, Haojie; Yan, Chun

    2018-04-01

    Because of the cluster technology in real-time video transcoding device, the application of facing the massive growth in the number of video assignments and resolution and bit rate of diversity, task scheduling algorithm, and analyze the current mainstream of cluster for real-time video transcoding equipment characteristics of the cluster, combination with the characteristics of the cluster equipment task delay scheduling algorithm is proposed. This algorithm enables the cluster to get better performance in the generation of the job queue and the lower part of the job queue when receiving the operation instruction. In the end, a small real-time video transcode cluster is constructed to analyze the calculation ability, running time, resource occupation and other aspects of various algorithms in operation scheduling. The experimental results show that compared with traditional clustering task scheduling algorithm, task delay scheduling algorithm has more flexible and efficient characteristics.

  5. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  6. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  7. A Simulation Based Approach to Optimize Berth Throughput Under Uncertainty at Marine Container Terminals

    NASA Technical Reports Server (NTRS)

    Golias, Mihalis M.

    2011-01-01

    Berth scheduling is a critical function at marine container terminals and determining the best berth schedule depends on several factors including the type and function of the port, size of the port, location, nearby competition, and type of contractual agreement between the terminal and the carriers. In this paper we formulate the berth scheduling problem as a bi-objective mixed-integer problem with the objective to maximize customer satisfaction and reliability of the berth schedule under the assumption that vessel handling times are stochastic parameters following a discrete and known probability distribution. A combination of an exact algorithm, a Genetic Algorithms based heuristic and a simulation post-Pareto analysis is proposed as the solution approach to the resulting problem. Based on a number of experiments it is concluded that the proposed berth scheduling policy outperforms the berth scheduling policy where reliability is not considered.

  8. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  9. Game Schedules and Rate of Concussions in the National Football League.

    PubMed

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P < .01). No significant association was found between the rate of concussion and the days of rest, game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  10. Effect of overtime work on cognitive function in automotive workers.

    PubMed

    Proctor, S P; White, R F; Robins, T G; Echeverria, D; Rocskay, A Z

    1996-04-01

    The present investigation examined whether increased overtime work predicts impairment in cognitive performance in the domains of attention, executive function, and mood. The behavioral and cognitive functions of 248 automotive workers were measured by a neurobehavioral test performance. Overtime, defined as number of hours worked greater than 8 h a day or greater than 5 d a week, was calculated from company payroll records for the week before the test day. The number of consecutive days worked before the test day was also determined. Cross-sectional data analysis by multiple linear regression, after adjustment for the effects of age, education, gender, alcohol intake, repeated grade in school, acute petroleum naphtha exposure, shift worked, job type, number of consecutive days worked before the test day, and number of hours worked on the test day before the testing, demonstrated that increased overtime was significantly associated with impaired performance on several tests of attention and executive function. Increased feelings of depression, fatigue, and confusion were also associated with increased overtime work. In addition significant interaction effects were observed for job type but not for naphtha exposure. The findings support the hypothesis that overtime work results in impaired cognitive performance in the areas of attention and executive function and that both overtime hours and the number of consecutive days worked prior to a test day affect mood.

  11. 76 FR 21722 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... Notice of Cancellation of Reactive Power Rate Schedule. Filed Date: 04/07/2011. Accession Number...)(2)(iii): Revisions to the Tariff and OA re Emerg. Load Response Program ``Reporting'' to be... Reactive Rate Schedule Notice of Succession to be effective 3/9/2011. Filed Date: 04/07/2011. Accession...

  12. 5 CFR 340.101 - Principal statutory requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Findings and Purpose Sec. 2. (a) The Congress finds that— (1) many individuals in our society possess great... be equal to the percentage which bears the same ratio to the percentage determined under this... scheduled workweek bears to the average number of hours in the regularly scheduled workweek of an employee...

  13. 5 CFR 610.111 - Establishment of workweeks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... administrative workweek. All work performed by an employee within the first 40 hours is considered regularly scheduled work for premium pay and hours of duty purposes. Any additional hours of officially ordered or... administrative workweek is the total number of regularly scheduled hours of duty a week. (2) When an employee has...

  14. 36 CFR 1226.14 - What are the limitations in applying approved records schedules?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Park, MD 20740-6001, phone number (301) 837-1738, when permanent or unscheduled records are to be... applying approved records schedules? 1226.14 Section 1226.14 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.14 What are the...

  15. 36 CFR 1226.14 - What are the limitations in applying approved records schedules?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Park, MD 20740-6001, phone number (301) 837-1738, when permanent or unscheduled records are to be... applying approved records schedules? 1226.14 Section 1226.14 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.14 What are the...

  16. 36 CFR 1226.14 - What are the limitations in applying approved records schedules?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Park, MD 20740-6001, phone number (301) 837-1738, when permanent or unscheduled records are to be... applying approved records schedules? 1226.14 Section 1226.14 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.14 What are the...

  17. 36 CFR 1226.14 - What are the limitations in applying approved records schedules?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Park, MD 20740-6001, phone number (301) 837-1738, when permanent or unscheduled records are to be... applying approved records schedules? 1226.14 Section 1226.14 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.14 What are the...

  18. 33 CFR 402.7 - Service Incentive Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... number of calls scheduled for the Navigation Season. Additional calls to the system may be added during the season. (f) The carrier will advise the Manager of port rotation, outlining core ports of calls... carrier must meet 75% schedule adherence with a minimum of four (4) Great Lakes calls during the...

  19. Office Organization and Procedures in the Office--Calendar; Commencement Procedure; Publications; Records; Registration; Reports; Scheduling; Staffing; Testing; Transcripts

    ERIC Educational Resources Information Center

    College and University, 1977

    1977-01-01

    Proceedings of AACRAO's 63rd annual meeting cover: calendar conversion; publications economy; class schedules; fraudulent transcripts; student retention; student ID numbers; veteran student reporting; financial aid reporting; faculty activity analyses; time management; registration; and transcript forms for nontraditional programs. (LBH)

  20. A Principal Components Analysis of the Rathus Assertiveness Schedule.

    ERIC Educational Resources Information Center

    Law, H. G.; And Others

    1979-01-01

    Investigated the adequacy of the Rathus Assertiveness Schedule (RAS) as a global measure of assertiveness. Analysis indicated that the RAS does not provide a unidimensional index of assertiveness, but rather measures a number of factors including situation-specific assertive behavior, aggressiveness, and a more general assertiveness. (Author)

  1. Time management situation assessment (TMSA)

    NASA Technical Reports Server (NTRS)

    Richardson, Michael B.; Ricci, Mark J.

    1992-01-01

    TMSA is a concept prototype developed to support NASA Test Directors (NTDs) in schedule execution monitoring during the later stages of a Shuttle countdown. The program detects qualitative and quantitative constraint violations in near real-time. The next version will support incremental rescheduling and reason over a substantially larger number of scheduled events.

  2. 49 CFR Schedule G to Subpart B of... - Selected Statistical Data

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Selected Statistical Data G Schedule G to Subpart... Statistical Data [Dollars in thousands] () Greyhound Lines, Inc. () Trailways combined () All study carriers.... 9002, L. 9, col. (b) Other Statistics: 25Number of regulator route intercity passenger miles Sch. 9002...

  3. 19 CFR 122.154 - Notice of arrival.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...

  4. 19 CFR 122.154 - Notice of arrival.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...

  5. 19 CFR 122.154 - Notice of arrival.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...

  6. 19 CFR 122.154 - Notice of arrival.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... notice of arrival shall state: (1) Type of aircraft and registration number; (2) Name of aircraft... aircraft entering the U.S. from Cuba must give advance notice of arrival, unless it is an Office of Foreign Assets Control (OFAC) approved scheduled commercial aircraft of a scheduled airline. (b) Procedure for...

  7. Scheduling Independent Partitions in Integrated Modular Avionics Systems

    PubMed Central

    Du, Chenglie; Han, Pengcheng

    2016-01-01

    Recently the integrated modular avionics (IMA) architecture has been widely adopted by the avionics industry due to its strong partition mechanism. Although the IMA architecture can achieve effective cost reduction and reliability enhancement in the development of avionics systems, it results in a complex allocation and scheduling problem. All partitions in an IMA system should be integrated together according to a proper schedule such that their deadlines will be met even under the worst case situations. In order to help provide a proper scheduling table for all partitions in IMA systems, we study the schedulability of independent partitions on a multiprocessor platform in this paper. We firstly present an exact formulation to calculate the maximum scaling factor and determine whether all partitions are schedulable on a limited number of processors. Then with a Game Theory analogy, we design an approximation algorithm to solve the scheduling problem of partitions, by allowing each partition to optimize its own schedule according to the allocations of the others. Finally, simulation experiments are conducted to show the efficiency and reliability of the approach proposed in terms of time consumption and acceptance ratio. PMID:27942013

  8. NRC comprehensive records disposition schedule. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate durationmore » of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).« less

  9. A Generalization of the Formula for the Triangular Number of the Sum and Product of Natural Numbers

    ERIC Educational Resources Information Center

    Asiru, M. A.

    2008-01-01

    This note generalizes the formula for the triangular number of the sum and product of two natural numbers to similar results for the triangular number of the sum and product of "r" natural numbers. The formula is applied to derive formula for the sum of an odd and an even number of consecutive triangular numbers.

  10. A Preliminary Randomized Controlled Trial of Contingency Management for Alcohol Use Reduction Using a Transdermal Alcohol Sensor

    PubMed Central

    Barnett, Nancy P.; Celio, Mark A.; Tidey, Jennifer W.; Murphy, James G.; Colby, Suzanne M.; Swift, Robert M.

    2017-01-01

    Aims We tested the efficacy of daily contingent reinforcement for reducing alcohol use compared with (yoked) noncontingent reinforcement (NR) using a transdermal alcohol sensor to detect alcohol use. Design Pilot randomized controlled design with one baseline week, three intervention weeks, and one-month follow up. Setting New England, USA. Participants Heavy drinking adults (46.7% female) not seeking treatment were randomized to 1) an escalating schedule of cash reinforcement (CR; n =15) for days on which alcohol was neither reported nor detected or 2) yoked NR (n =15). Intervention and comparator Reinforcement for CR participants started at $5 and increased $2 every subsequent day on which alcohol was not detected or reported, to a maximum of $17. Participants received no reinforcement for days on which alcohol use was detected or reported, and the reinforcer value was re-set to $5 the day after a drinking day. NR participants were yoked to the daily reinforcer value of an individual in the CR condition, in order of enrollment. Paired participants in CR and NR therefore received the same amount of money, but the amount for the NR participant was not behavior-related. Measurements The primary outcome was percent days without sensor-detected drinking. Secondary outcomes were number of consecutive days with no detected drinking, peak transdermal alcohol concentration (TAC), self-reported drinks per week, and drinking below NIH low-risk guidelines. Findings Controlling for baseline, CR had higher percent days with no drinking detected (54.3%) than NR (31.2%) during intervention weeks (p = .05, Cohen’s d = 0.74; 95% CI: 007–1.47). The longest period of consecutive days with no drinking detected was 8.0 for CR vs. 2.9 for NR (p = .03, d = 0.85; 95% CI: .08–1.61). Peak TAC during intervention showed a nonsignificant group difference (p = .20; d = .48; 95% CI: .00–1.18); a similar result was found for drinks per week (p = .12; d = .59; 95% CI: .00–1.30). Four times more participants in CR drank below NIH low-risk drinking guidelines during intervention than did participants in NR: 31.1% vs. 7.1% (p = .07; d = .71; 95% CI: −0.04–1.46). At 1-month follow up, the highest number of consecutive days without drinking (self-report) did not differ significantly between conditions (p = .26), but showed a medium effect size (d = .44; 95% CI: −.32–1.18). Conclusions Cash incentives linked to a transdermal alcohol sensor can reduce heavy alcohol consumption while the incentives are in operation. PMID:28107772

  11. Weekend Ecstasy use disrupts memory in rats

    PubMed Central

    McAleer, Leah M.; Schallert, Timothy; Duvauchelle, Christine L.

    2013-01-01

    3,4-Methylenedioxymethamphetamine (MDMA, or “Ecstasy”) is a popular recreational drug. However, its exposure is often limited to the weekends in a highly stimulating environment. The goal of this study was to investigate the behavioral domains of working and recognition memory within a model of “weekend” Ecstasy use. Rats self-administered MDMA during 2-hr sessions on two consecutive days followed by five drug-free days. Coupling this intermittent dosing schedule with a novel object recognition task, we found non-spatial memory impaired after only two “weekends” of self-administered MDMA. Our findings suggest that MDMA at recreational use levels can disrupt memory processes. PMID:23707649

  12. Impact of the addition of new vaccines in the early childhood schedule on vaccine coverage by 24 months of age from 2006 to 2016 in Quebec, Canada.

    PubMed

    Kiely, Marilou; Boulianne, Nicole; Talbot, Denis; Ouakki, Manale; Guay, Maryse; Landry, Monique; Zafack, Joseline; Sauvageau, Chantal; De Serres, Gaston

    2018-07-05

    Between 2004 and 2016, in the province of Quebec (Canada), 4 new antigens were added in the early childhood vaccine schedule from birth to 18 months, increasing the number of injections or doses needed from 7 to 12. These additions may have decreased the proportion of children who had received all recommended vaccines. To assess the impact of the introduction of new vaccines to the childhood schedule on the 24-month vaccine coverage from 2006 to 2016 and identify factors associated with incomplete vaccination status by 24 months of age. We used the data from six cross-sectional vaccine coverage surveys conducted every two years which included a total of 3515 children aged 2 years old and randomly selected from the Quebec public health insurance database. Factors associated with an incomplete vaccine status by 24 months were identified with multivariable logistic regression. Despite the addition of 4 new vaccine antigens since 2004, the vaccine coverage remained high from 2006 (82.4%) through 2016 (88.3%) for vaccines present in the schedule since 2006. In 2016, vaccine coverage was 78.2% for all vaccines included in the schedule. The vaccine coverage of new vaccines increases rapidly within 2 years of their introduction. For both new and older vaccines, incomplete vaccine status by 24 months of age is associated with a delay of 30 days or more in receiving the vaccines scheduled at 2 and 12 months of age. Increasing to 12 the number of doses in the recommended schedule has slightly reduced the vaccine coverage by 24 months of age and the vaccine coverage of vaccines already in the schedule remained stable over the years. Future additions to the vaccine schedule may not be similarly accepted by the population and this will require continuing the monitoring of vaccine coverage. Copyright © 2018 Elsevier Ltd. All rights reserved.

  13. A Novel Procedure for Evaluating the Reinforcing Properties of Tastants in Laboratory Rats: Operant Intraoral Self-administration

    PubMed Central

    Levy, AnneMarie; Limebeer, Cheryl L.; Ferdinand, Justin; Shillingford, Ucal; Parker, Linda A.; Leri, Francesco

    2014-01-01

    This paper describes a novel method for studying the bio-behavioral basis of addiction to food. This method combines the surgical component of taste reactivity with the behavioral aspects of operant self-administration of drugs. Under very brief general anaesthesia, rats are implanted with an intraoral (IO) cannula that allows delivery of test solutions directly in the oral cavity. Animals are then tested in operant self-administration chambers whereby they can press a lever to receive IO infusions of test solutions. IO self-administration has several advantages over experimental procedures that involve drinking a solution from a spout or operant responding for solid pellets or solutions delivered in a receptacle. Here, we show that IO self-administration can be employed to study self-administration of high fructose corn syrup (HFCS). Rats were first tested for self-administration on a progressive ratio (PR) schedule, which assesses the maximum amount of operant behavior that will be emitted for different concentrations of HFCS (i.e. 8%, 25%, and 50%). Following this test, rats self-administered these concentrations on a continuous schedule of reinforcement (i.e. one infusion for each lever press) for 10 consecutive days (1 session/day; each lasting 3 hr), and then they were retested on the PR schedule. On the continuous reinforcement schedule, rats took fewer infusions of higher concentrations, although the lowest concentration of HFCS (8%) maintained more variable self-administration. Furthermore, the PR tests revealed that 8% had lower reinforcing value than 25% and 50%. These results indicate that IO self-administration can be employed to study acquisition and maintenance of responding for sweet solutions. The sensitivity of the operant response to differences in concentration and schedule of reinforcement makes IO self-administration an ideal procedure to investigate the neurobiology of voluntary intake of sweets. PMID:24561923

  14. Clinical outcome of an alternative fotemustine schedule in elderly patients with recurrent glioblastoma: a mono-institutional retrospective study.

    PubMed

    Lombardi, Giuseppe; Bellu, Luisa; Pambuku, Ardi; Della Puppa, Alessandro; Fiduccia, Pasquale; Farina, Miriam; D'Avella, Domenico; Zagonel, Vittorina

    2016-07-01

    The optimal treatment of recurrent glioblastoma (GBM) in elderly patients is unclear. Fotemustine (FTM) is a third-generation nitrosourea showing efficacy in gliomas and it has been used with different schedules in adult patients. We performed, for the first time anywhere, a mono-institutional retrospective study to analyze the clinical outcome of an alternative fotemustine schedule in elderly patients with recurrent GBM. Retrospectively, we analyzed all GBM patients 65 years or older previously treated with the combination of radiation therapy and temozolomide (TMZ), receiving an alternative FTM schedule as second-line treatment at our Oncological Center from October 2011 to October 2014 with an ECOG PS ≤ 2. FTM was administrated at 80 mg/m(2) every 2 weeks for five consecutive administrations (induction phase), and then every 4 weeks at 80 mg/m(2) as maintenance. We enrolled 44 patients, 33 males and 11 females; average age was 70 years. ECOG PS was 0-1 in 80 % of the patients. 38 patients relapsed during temozolomide (TMZ) therapy. MGMT methylation status was analyzed in 34 patients and MGMT was methylated in 53 % of the patients. The median progression free survival (PFS) and overall survival (OS) from FTM treatment was 4.1 months (95 % CI 3.1-5.2) and 7 months (95 % CI 5.2-8.4), respectively. Patients with MGMT methylated status and patients who relapsed after completing TMZ therapy had a longer PFS and OS from the beginning of FTM. Thrombocytopenia was the most frequent grade 3-4 haematological toxicity (9 %). The alternative schedule of FTM may be an active and safe treatment for elderly patients with recurrent glioblastoma, especially patients with methylated MGMT and who relapsed after completing temozolomide therapy.

  15. Economic impact of simplified de Gramont regimen in first-line therapy in metastatic colorectal cancer.

    PubMed

    Limat, Samuel; Bracco-Nolin, Claire-Hélène; Legat-Fagnoni, Christine; Chaigneau, Loic; Stein, Ulrich; Huchet, Bernard; Pivot, Xavier; Woronoff-Lemsi, Marie-Christine

    2006-06-01

    The cost of chemotherapy has dramatically increased in advanced colorectal cancer patients, and the schedule of fluorouracil administration appears to be a determining factor. This retrospective study compared direct medical costs related to two different de Gramont schedules (standard vs. simplified) given in first-line chemotherapy with oxaliplatin or irinotecan. This cost-minimization analysis was performed from the French Health System perspective. Consecutive unselected patients treated in first-line therapy by LV5FU2 de Gramont with oxaliplatin (Folfox regimen) or with irinotecan (Folfiri regimen) were enrolled. Hospital and outpatient resources related to chemotherapy and adverse events were collected from 1999 to 2004 in 87 patients. Overall cost was reduced in the simplified regimen. The major factor which explained cost saving was the lower need for admissions for chemotherapy. Amount of cost saving depended on the method for assessing hospital stay. In patients treated by the Folfox regimen the per diem and DRG methods found cost savings of Euro 1,997 and Euro 5,982 according to studied schedules; in patients treated by Folfiri regimen cost savings of Euro 4,773 and Euro 7,274 were observed, respectively. In addition, travel costs were also reduced by simplified regimens. The robustness of our results was showed by one-way sensitivity analyses. These findings demonstrate that the simplified de Gramont schedule reduces costs of current first-line chemotherapy in advanced colorectal cancer. Interestingly, our study showed several differences in costs between two costing approaches of hospital stay: average per diem and DRG costs. These results suggested that standard regimen may be considered a profitable strategy from the hospital perspective. The opposition between health system perspective and hospital perspective is worth examining and may affect daily practices. In conclusion, our study shows that the simplified de Gramont schedule in combination with oxaliplatin or irinotecan is an attractive option from the French Health System perspective. This safe and less costly regimen must compared to alternative options such as oral fluoropyrimidines.

  16. Improving Ambulatory Saliva-Sampling Compliance in Pregnant Women: A Randomized Controlled Study

    PubMed Central

    Moeller, Julian; Lieb, Roselind; Meyer, Andrea H.; Loetscher, Katharina Quack; Krastel, Bettina; Meinlschmidt, Gunther

    2014-01-01

    Objective Noncompliance with scheduled ambulatory saliva sampling is common and has been associated with biased cortisol estimates in nonpregnant subjects. This study is the first to investigate in pregnant women strategies to improve ambulatory saliva-sampling compliance, and the association between sampling noncompliance and saliva cortisol estimates. Methods We instructed 64 pregnant women to collect eight scheduled saliva samples on two consecutive days each. Objective compliance with scheduled sampling times was assessed with a Medication Event Monitoring System and self-reported compliance with a paper-and-pencil diary. In a randomized controlled study, we estimated whether a disclosure intervention (informing women about objective compliance monitoring) and a reminder intervention (use of acoustical reminders) improved compliance. A mixed model analysis was used to estimate associations between women's objective compliance and their diurnal cortisol profiles, and between deviation from scheduled sampling and the cortisol concentration measured in the related sample. Results Self-reported compliance with a saliva-sampling protocol was 91%, and objective compliance was 70%. The disclosure intervention was associated with improved objective compliance (informed: 81%, noninformed: 60%), F(1,60)  = 17.64, p<0.001, but not the reminder intervention (reminders: 68%, without reminders: 72%), F(1,60)  = 0.78, p = 0.379. Furthermore, a woman's increased objective compliance was associated with a higher diurnal cortisol profile, F(2,64) = 8.22, p<0.001. Altered cortisol levels were observed in less objective compliant samples, F(1,705) = 7.38, p = 0.007, with delayed sampling associated with lower cortisol levels. Conclusions The results suggest that in pregnant women, objective noncompliance with scheduled ambulatory saliva sampling is common and is associated with biased cortisol estimates. To improve sampling compliance, results suggest informing women about objective compliance monitoring but discourage use of acoustical reminders. PMID:24465958

  17. 75 FR 76977 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ...-Institutional Steam Generating Units (Renewal), EPA ICR Number 1564.08, OMB Control Number 2060-0202 AGENCY...: EPA ICR Number 1564.08, OMB Control Number 2060-0202. ICR Status: This ICR is scheduled to expire on...

  18. Scheduling job shop - A case study

    NASA Astrophysics Data System (ADS)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  19. Operating room scheduling using hybrid clustering priority rule and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Santoso, Linda Wahyuni; Sinawan, Aisyah Ashrinawati; Wijaya, Andi Rahadiyan; Sudiarso, Andi; Masruroh, Nur Aini; Herliansyah, Muhammad Kusumawan

    2017-11-01

    Operating room is a bottleneck resource in most hospitals so that operating room scheduling system will influence the whole performance of the hospitals. This research develops a mathematical model of operating room scheduling for elective patients which considers patient priority with limit number of surgeons, operating rooms, and nurse team. Clustering analysis was conducted to the data of surgery durations using hierarchical and non-hierarchical methods. The priority rule of each resulting cluster was determined using Shortest Processing Time method. Genetic Algorithm was used to generate daily operating room schedule which resulted in the lowest values of patient waiting time and nurse overtime. The computational results show that this proposed model reduced patient waiting time by approximately 32.22% and nurse overtime by approximately 32.74% when compared to actual schedule.

  20. Efficacy of osmoprotectants on prevention and treatment of murine dry eye.

    PubMed

    Chen, Wei; Zhang, Xin; Li, Jinyang; Wang, Yu; Chen, Qi; Hou, Chao; Garrett, Qian

    2013-09-19

    To evaluate the efficacy of osmoprotectants on prevention and treatment of dry eye in a murine model. Dry eye was induced in mice by using an intelligently controlled environmental system (ICES). Osmoprotectants betaine, L-carnitine, erythritol, or vehicle (PBS) were topically administered to eyes four times daily following two schedules: schedule 1 (modeling prevention): dosing started at the beginning of housing in ICES and lasted for 21 or 35 days; schedule 2 (modeling treatment): dosing started after ICES-housed mice developed dry eye (day 21), continuing until day 35. Treatment efficacy was evaluated for corneal fluorescein staining; corneal epithelial apoptosis by TUNEL and caspase-3 assays; goblet cell numbers by PAS staining; and expression of inflammatory mediators, TNF-α, IL-17, IL-6, or IL-1β by using RT-PCR on days 0, 14, 21, and/or 35. Compared with vehicle, prophylactic administration of betaine, L-carnitine, or erythritol significantly decreased corneal staining and expression of TNF-α and IL-17 on day 21 (schedule 1). Treatment of mouse dry eye with osmoprotectants significantly reduced corneal staining on day 35 compared with day 21 (schedule 2). Relative to vehicle, L-carnitine treatment of mouse dry eye for 14 days (days 21 to 35) resulted in a significant reduction in corneal staining, number of TUNEL-positive cells, and expression of TNF-α, IL-17, IL-6, or IL-1β, as well as significantly increased the number of goblet cells. Topical application of betaine, L-carnitine, or erythritol systematically limited progression of environmentally induced dry eye. L-carnitine can also reduce the severity of such dry-eye conditions.

  1. Circadian phase resetting in older people by ocular bright light exposure.

    PubMed

    Klerman, E B; Duffy, J F; Dijk, D J; Czeisler, C A

    2001-01-01

    Aging is associated with frequent complaints about earlier bedtimes and waketimes. These changes in sleep timing are associated with an earlier timing of multiple endogenous rhythms, including core body temperature (CBT) and plasma melatonin, driven by the circadian pacemaker. One possible cause of the age-related shift of endogenous circadian rhythms and the timing of sleep relative to clock time is a change in the phase-shifting capacity of the circadian pacemaker in response to the environmental light-dark cycle, the principal synchronizer of the human circadian system. We studied the response of the circadian system of 24 older men and women and 23 young men to scheduled exposure to ocular bright light stimuli. Light stimuli were 5 hours in duration, administered for 3 consecutive days at an illuminance of approximately 10,000 lux. Light stimuli were scheduled 1.5 or 3.5 hours after the CBT nadir to induce shifts of endogenous circadian pacemaker to an earlier hour (phase advances) or were scheduled 1.5 hours before the CBT nadir to induce shifts to a later hour (phase delays). The rhythms of CBT and plasma melatonin assessed under constant conditions served as markers of circadian phase. Bright light stimuli elicited robust responses of the circadian timing system in older people; both phase advances and phase delays were induced. The magnitude of the phase delays did not differ significantly between older and younger individuals, but the phase advances were significantly attenuated in older people. The attenuated response to light stimuli that induce phase advances does not explain the advanced phase of the circadian pacemaker in older people. The maintained responsiveness of the circadian pacemaker to light implies that scheduled bright light exposure can be used to treat circadian phase disturbances in older people.

  2. Different MK-801 administration schedules induce mild to severe learning impairments in an operant conditioning task: role of buspirone and risperidone in ameliorating these cognitive deficits.

    PubMed

    Rapanelli, Maximiliano; Frick, Luciana Romina; Bernardez-Vidal, Micaela; Zanutto, Bonifacio Silvano

    2013-11-15

    Blockade of N-methyl-d-aspartate receptor (NMDA) by the noncompetitive NMDA receptor (NMDAR) antagonist MK-801 produces behavioral abnormalities and alterations in prefrontal cortex (PFC) functioning. Due to the critical role of the PFC in operant conditioning task learning, we evaluated the effects of acute, repeated postnatal injections of MK-801 (0.1mg/kg) on learning performance. We injected Long-Evans rats i.p. with MK-801 (0.1mg/kg) using three different administration schedules: injection 40 min before beginning the task (during) (n=12); injection twice daily for six consecutive days prior to beginning the experimental procedures (prior) (n=12); or twice daily subcutaneous injections from postnatal day 7 to 11 (postnatal) (n=12). Next, we orally administered risperidone (serotonin receptor 2A and dopamine receptor 2 antagonist, 1mg/kg) or buspirone (serotonin receptor 1A partial agonist, 10mg/kg) to animals treated with the MK-801 schedule described above. The postnatal and prior administration schedules produced severe learning deficits, whereas injection of MK-801 just before training sessions had only mild effects on acquisition of an operant conditioning. Risperidone was able to reverse the detrimental effect of MK-801 in the animals that were treated with MK-801 during and prior training sessions. In contrast, buspirone was only effective at mitigating the cognitive deficits induced by MK-801 when administered during the training procedures. The data demonstrates that NMDA antagonism disrupts basic mechanisms of learning in a simple PFC-mediated operant conditioning task, and that buspirone and risperidone failed to attenuate the learning deficits when NMDA neurotransmission was blocked in the early stages of the postnatal period. Copyright © 2013 Elsevier B.V. All rights reserved.

  3. Variable Scheduling to Mitigate Channel Losses in Energy-Efficient Body Area Networks

    PubMed Central

    Tselishchev, Yuriy; Boulis, Athanassios; Libman, Lavy

    2012-01-01

    We consider a typical body area network (BAN) setting in which sensor nodes send data to a common hub regularly on a TDMA basis, as defined by the emerging IEEE 802.15.6 BAN standard. To reduce transmission losses caused by the highly dynamic nature of the wireless channel around the human body, we explore variable TDMA scheduling techniques that allow the order of transmissions within each TDMA round to be decided on the fly, rather than being fixed in advance. Using a simple Markov model of the wireless links, we devise a number of scheduling algorithms that can be performed by the hub, which aim to maximize the expected number of successful transmissions in a TDMA round, and thereby significantly reduce transmission losses as compared with a static TDMA schedule. Importantly, these algorithms do not require a priori knowledge of the statistical properties of the wireless channels, and the reliability improvement is achieved entirely via shuffling the order of transmissions among devices, and does not involve any additional energy consumption (e.g., retransmissions). We evaluate these algorithms directly on an experimental set of traces obtained from devices strapped to human subjects performing regular daily activities, and confirm that the benefits of the proposed variable scheduling algorithms extend to this practical setup as well. PMID:23202183

  4. Time-optimum packet scheduling for many-to-one routing in wireless sensor networks

    USGS Publications Warehouse

    Song, W.-Z.; Yuan, F.; LaHuser, R.

    2007-01-01

    This paper studies the WSN application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs max(2N(u1) - 1, N(u 0) -1) time slots, assuming each node reports one unit of data in each round. Here N(u0) is the total number of sensors, while N(u 1) denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also eliminated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle. ??2006 IEEE.

  5. Time-optimum packet scheduling for many-to-one routing in wireless sensor networks

    USGS Publications Warehouse

    Song, W.-Z.; Yuan, F.; LaHusen, R.; Shirazi, B.

    2007-01-01

    This paper studies the wireless sensor networks (WSN) application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs [image omitted], N(u0)-1) time slots, assuming each node reports one unit of data in each round. Here [image omitted] is the total number of sensors, while [image omitted] denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet-scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also mitigated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle.

  6. Vaccinating my way--use of alternative vaccination schedules in New York State.

    PubMed

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P < .05). Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P < .05). Almost 1 in 4 children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  7. Schedule-induced polydipsia in the spontaneously hypertensive rat and its relation to impulsive behaviour.

    PubMed

    Ibias, Javier; Pellón, Ricardo

    2011-09-30

    Eight Spontaneously Hypertensive Rat (SHR), 8 Wistar-Kyoto (WKY) and 8 Wistar rats, all male, maintained at 80-85% of their free-feeding weight by controlled access to food, were exposed to a series of fixed time (FT) schedules whereby food pellets were regularly delivered regardless of the animals' behaviour. The FT values used were 9, 15, 30, 60, 120 and 180 s, with the order of presentation of the schedules among the animals being counterbalanced (except under the FT 120-s and 180-s schedules, which were successively presented as the last two of the series). Due to freely available access to water, the animals developed schedule-induced drinking under all FT schedules, marked by the characteristic bitonic function that relates the number of licks and amount of water drunk to the length of the inter-food interval. Wistar and WKY rats displayed maximum drinking under an FT 15-s schedule, with WKY rats registering lower quantities across all FT values. Among SHR rats, maximum schedule-induced polydipsia was observed under the FT 30-s schedule, with a rightward shift in the bitonic function compared to controls. For long FT values, the temporal distribution of licks within inter-food intervals was shifted slightly towards the right in the SHR rats. In a subsequent study, only the SHR and Wistar rats were used, and the animals were exposed to a delay-discounting procedure. The rats were faced with successive choices, in which they could choose between an immediate reward of one food pellet and another of four food pellets at a delay of 3, 6, 12 or 24s. In the case of the longer delays, SHR rats chose the immediate reward of lower magnitude more often than did their Wistar counterparts, and also committed a greater number of omissions during the forced-choice trials of the procedure. The results indicate that differences in schedule-induced polydipsia are related to indexes of cognitive rather than motor impulsivity, a finding in line with the theoretical idea that adjunctive behaviour is linked to operant reinforcement processes. Copyright © 2011 Elsevier B.V. All rights reserved.

  8. Master plan nurse duty roster using the 0-1 goal programming technique

    NASA Astrophysics Data System (ADS)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  9. Analysis of crimes committed against scheduled tribes

    NASA Astrophysics Data System (ADS)

    Khadse, Vivek P.; Akhil, P.; Anto, Christopher; Gnanasigamani, Lydia J.

    2017-11-01

    One of the curses to the society is a crime which has a deep impact on the society. Victims of crimes are the one who is impacted the most. All communities in the world are affected by crime and the criminal justice system, but largely impacted communities are the backward classes. There are many cases reported of crime committed against scheduled tribes from the year 2005 till date. This paper states the analysis of Crimes Committed against Scheduled Tribes in the year 2015 in various states and union territories in India. In this study, Multiple Linear regression techniques have been used to analyze the crimes committed against scheduled tribes’ community in India. This study compares the number of cases reported to the police station and rate of crime committed in different states in India. It also states the future prediction of the crime that would happen. It will also predict the number of cases of crime committed against the scheduled tribe that can be reported in future. The dataset which has been used in this study is taken from official Indian government repository for crimes which include different information of crimes committed against scheduled tribes in different states and union territories measured under the population census of the year 2011. This study will help different Indian states and union territory government to analyze and predict the future crimes that may occur and take appropriate measures against it before the actual crime would occur.

  10. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization.

    PubMed

    Mousavi, Maryam; Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs' battery charge. Assessment of the numerical examples' scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software.

  11. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization

    PubMed Central

    Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm’s flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs’ battery charge. Assessment of the numerical examples’ scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software. PMID:28263994

  12. 76 FR 37347 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... Number 1750.06, OMB Control Number 2060-0393 AGENCY: Environmental Protection Agency (EPA). ACTION... Number 2060-0393. ICR status: This ICR is currently scheduled to expire on December 31, 2011. An Agency...

  13. 75 FR 25854 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... 2060-0451 AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In compliance with... Numbers: EPA ICR Number 1927.05, OMB Control Number 2060-0451. ICR Status: This ICR is scheduled to expire...

  14. An Evaluation of Photographic Activity Schedules to Increase Independent Playground Skills in Young Children with Autism

    ERIC Educational Resources Information Center

    Akers, Jessica S.; Higbee, Thomas S.; Pollard, Joy S.; Pellegrino, Azure J.; Gerencser, Kristina R.

    2016-01-01

    We used photographic activity schedules to increase the number of play activities completed by children with autism during unstructured time on the playground. All 3 participants engaged in more playground activities during and after training, and they continued to complete activities when novel photographs were introduced.

  15. Real-time scheduling faces operational challenges.

    PubMed

    2005-01-01

    Online real-time patient scheduling presents a number of challenges. But a few advanced organizations are rolling out systems slowly, meeting those challenges as they go. And while this application is still too new to provide measurable benefits, anecdotal information seems to point to improvements in efficiency, patient satisfaction, and possibly quality of care.

  16. Course Scheduling to Find the Minimum Cost Set of Facilities Required.

    ERIC Educational Resources Information Center

    Seccatore, Luis A.

    The problem of determining the quantity of classroom, laboratories and instructors to train sections of students attending numerous distinct courses in a school such as the Fleet Ballistic Missile School is considered. A procedure is developed for determining feasible schedules in order to graduate a fixed number of trainees over time while…

  17. 75 FR 16337 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... transportation by power plant operators more difficult. In response to this need, in early 2004, NAESB... receipt and delivery points; and (3) changes to the intraday nomination schedule to increase the number of... conference on the issue of intraday pipeline nomination schedules. In this regard, NGSA asserts that NAESB...

  18. User Need Satisfaction as a Basis for Tactical Airlift Scheduling.

    DTIC Science & Technology

    1984-03-01

    Yr.. Mo.. Day) 1S. PAGE COUNT MS Thesis FROM _ TO 1984 March 220 16. SUPPLEMENTARY NOTATION gym . Daan for Resoarch and Prolusloud ou -t, :... e...SUBROUTINE ROUTE. IT DOES THIS BY TESTING EACH MISSION C- FOR SCHEDULING CONFI ICTS . IF THE NUMBER OF EXPECTED C- CONFLICTS EXCEEDS A MINIMUM VALUE, THE

  19. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods.

  20. Scheduling Aircraft Landings under Constrained Position Shifting

    NASA Technical Reports Server (NTRS)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  1. Sentinel lymph node detection in patients with endometrial cancer.

    PubMed

    Niikura, Hitoshi; Okamura, Chikako; Utsunomiya, Hiroki; Yoshinaga, Kosuke; Akahira, Junichi; Ito, Kiyoshi; Yaegashi, Nobuo

    2004-02-01

    The purpose of this study was to examine the feasibility of sentinel lymph node (SLN) detection in patients with endometrial cancer using preoperative lymphoscintigraphy and an intraoperative gamma probe. Between June 2001 and January 2003, 28 consecutive patients with endometrial cancer who were scheduled for total abdominal hysterectomy, bilateral salpingo-oophorectomy, total pelvic lymphadenectomy, and paraaortic lymphadenectomy at Tohoku University School of Medicine underwent sentinel lymph node detection. On the day before surgery, preoperative lymphoscintigraphy was performed by injection of 99m-Technetium ((99m)Tc)-labeled phytate into the endometrium during hysteroscopy. At the time of surgery, a gamma-detecting probe was used to locate radioactive lymph nodes. At least one sentinel node was detected in each of 23 of the 28 patients (82%). The mean number of sentinel nodes detected was 3.1 (range, 1-9). Sentinel nodes could be identified in 21 of 22 patients (95%) whose tumor did not invade more than halfway into the myometrium. Eighteen patients had radioactive nodes in the paraaortic area. Most patients had a sentinel node in one of the following three sites: paraaortic, external iliac, and obturator. The sensitivity and specificity for detecting lymph node metastases were both 100%. The combination of preoperative lymphoscintigraphy with intraoperative gamma probe detection may be useful in identifying sentinel nodes in early-stage endometrial cancer.

  2. Analysis of the efficacy of marketing tools in facial plastic surgery.

    PubMed

    Zavod, Matthew B; Adamson, Peter A

    2008-06-01

    To compare referral sources to a facial plastic surgery practice and to develop models correlating the referral source with the decision for surgery. Retrospective descriptive study. Well-established, metropolitan, private facial plastic surgery practice with training fellowship affiliated with an academic centre. One-thousand eighty-nine new consecutive patients presenting between January 2001 and December 2005 recorded intake data including age, gender, and chief complaint. Final data input was their decision for or against surgery. Main outcome measures included differences in referral sources based on data collected and how those sources related to decision for surgery. A 50% conversion rate was found. Women and older patients were more likely to be referred from magazines, television, and newspapers and for facial rejuvenation. Men and younger patients were more likely to be referred from the website and for rhinoplasty. For facial rejuvenation, both the number of patients interested in and the probability that they agreed to the procedure increased with age. For rhinoplasty, the converse was true. The most likely patients to schedule surgery were those who were referred from other patients, friends, or family members in our practice. The data confirm that word-of-mouth referrals are the most important source for predicting which patients will elect to proceed with surgery in this established facial cosmetic surgery practice.

  3. Depressed mood in the working population: associations with work schedules and working hours.

    PubMed

    Driesen, Karolien; Jansen, Nicole W H; Kant, Ijmert; Mohren, Danielle C L; van Amelsvoort, Ludovic G P M

    2010-07-01

    The impact of working time arrangements (WTA) on health has been studied extensively. Still, little is known about the interrelation between work schedules, working hours, and depressed mood. For work schedules, the underlying assumptions regarding depressed mood refer to a disturbance of social and biological rhythms, whereas for working hours, the assumptions relate to workload and work capacity. Conversely, depressed mood may urge an employee to adjust his/her work schedule and/or number of working hours/week (h/wk). The aim of this study was to assess the association between work schedule and working hours with depressed mood. Using baseline data from the Maastricht Cohort Study, depressed mood in day work was compared with depressed mood in different shiftwork schedules (n = 8843). Within day work, several categories of working h/wk were studied in association with depressed mood (n = 7217). The association between depressed mood and several aspects of overtime was assessed separately. Depressed mood was measured with a dichotomous item: "Did you feel down every day over the last two weeks?" Separate logistic regression analyses were conducted for men and women, with adjustments for potential confounders. The odds ratio (OR) for depressed mood was greater for men involved in shiftwork than for men only involved in day work (three-shift OR = 2.05 [95% confidence interval, CI 1.52-2.77]; five-shift OR = 1.34 [95% CI 1.00-1.80]; irregular-shift OR = 1.79 [95% CI 1.27-2.53]). In female employees, five-shift work was associated with a higher prevalence of depressed mood (OR = 5.96 [95% CI 2.83-12.56]). Regarding the number of working h/wk, men working <26 h/wk had a higher prevalence of depressed mood than men working 36-40 h/wk (OR = 2.73 [95% CI 1.35-5.52]). After conducting trend analyses, a significant decreasing trend was found in men, whereas an increasing trend was found in women working a high number of hours. Furthermore, a dose-response relationship was present in men regarding the number of overtime h/wk. This study showed that different work schedules and working hours are associated with depressed mood. Shiftwork was related to a higher prevalence of depressed mood than day work. The association was more pronounced for male employees. Regarding the number of working h/wk, male and female employees showed an opposite trend in depressed mood. Because of the possibility of a healthy worker effect and the possibility of a reciprocal relationship between WTA and depressed mood, the reported relation might be underestimated. This study has illustrated that occupational physicians, who deal with depressed mood among workers, should carefully consider the impact of WTA.

  4. 75 FR 43971 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... Facilities (Renewal), EPA ICR Number 1659.07, OMB Control Number 2060- 0325 AGENCY: Environmental Protection... Control Number 2060-0325. ICR Status: This ICR is scheduled to expire on August 31, 2010. Under OMB...

  5. 75 FR 6200 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... Production; EPA ICR Number 1788.09, OMB Control Number 2060-0417 AGENCY: Environmental Protection Agency (EPA... Control Number 2060-0388. ICR Status: This ICR is schedule to expire on February 28, 2010. Under OMB...

  6. 75 FR 44237 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... Number 1907.05, OMB Control Number 2060-0437 AGENCY: Environmental Protection Agency (EPA). ACTION... No. 1907.05, OMB Control Number 2060-0437. ICR Status: This ICR is scheduled to expire on July 31...

  7. 75 FR 29751 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... Distribution (Non-Gasoline) Facilities (Renewal), EPA ICR Number 1963.04, OMB Control Number 2060-0539 AGENCY... Control Number 2060-0539. ICR Status: This ICR is scheduled to expire on July 30, 2010. Under OMB...

  8. 75 FR 16458 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... Surface Coating (Renewal), EPA ICR Number 2044.04, OMB Control Number 2060-0537 AGENCY: Environmental....04, OMB Control Number 2060-0537. ICR Status: This ICR is scheduled to expire on April 30, 2010...

  9. 75 FR 39519 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... Facilities (Renewal), EPA ICR Number 1135.10, OMB Control Number 2060- 0171 AGENCY: Environmental Protection... Control Number 2060-0171. ICR Status: This ICR is scheduled to expire on July 31, 2010. Under OMB...

  10. A Low-Effort, Clinic-Wide Intervention Improves Attendance for HIV Primary Care

    PubMed Central

    Gardner, Lytt I.; Marks, Gary; Craw, Jason A.; Wilson, Tracey E.; Drainoni, Mari-Lynn; Moore, Richard D.; Mugavero, Michael J.; Rodriguez, Allan E.; Bradley-Springer, Lucy A.; Holman, Susan; Keruly, Jeanne C.; Sullivan, Meg; Skolnik, Paul R.; Malitz, Faye; Metsch, Lisa R.; Raper, James L.; Giordano, Thomas P.

    2012-01-01

    Background. Retention in care for human immunodeficiency virus (HIV)–infected patients is a National HIV/AIDS Strategy priority. We hypothesized that retention could be improved with coordinated messages to encourage patients' clinic attendance. We report here the results of the first phase of the Centers for Disease Control and Prevention/Health Resources and Services Administration Retention in Care project. Methods. Six HIV-specialty clinics participated in a cross-sectionally sampled pretest-posttest evaluation of brochures, posters, and messages that conveyed the importance of regular clinic attendance. 10 018 patients in 2008–2009 (preintervention period) and 11 039 patients in 2009–2010 (intervention period) were followed up for clinic attendance. Outcome variables were the percentage of patients who kept 2 consecutive primary care visits and the mean proportion of all primary care visits kept. Stratification variables were: new, reengaging, and active patients, HIV RNA viral load, CD4 cell count, age, sex, race or ethnicity, risk group, number of scheduled visits, and clinic site. Data were analyzed by multivariable log-binomial and linear models using generalized estimation equation methods. Results. Clinic attendance for primary care was significantly higher in the intervention versus preintervention year. Overall relative improvement was 7.0% for keeping 2 consecutive visits and 3.0% for the mean proportion of all visits kept (P < .0001). Larger relative improvement for both outcomes was observed for new or reengaging patients, young patients and patients with elevated viral loads. Improved attendance among the new or reengaging patients was consistent across the 6 clinics, and less consistent across clinics for active patients. Conclusion. Targeted messages on staying in care, which were delivered at minimal effort and cost, improved clinic attendance, especially for new or reengaging patients, young patients, and those with elevated viral loads. PMID:22828593

  11. Effectiveness and cost analysis of "just-in-time" salvage plerixafor administration in autologous transplant patients with poor stem cell mobilization kinetics.

    PubMed

    Li, Jie; Hamilton, Ellie; Vaughn, Louette; Graiser, Michael; Renfroe, Heather; Lechowicz, Mary Jo; Langston, Amelia; Prichard, Jefferson Mark; Anderson, Darlene; Gleason, Charise; Lonial, Sagar; Flowers, Christopher R; Kaufman, Jonathan L; Waller, Edmund K

    2011-10-01

    Plerixafor is a recently Food and Drug Administration (FDA)-approved CXCR4 antagonist, which is combined with granulocyte-colony-stimulating factor (G-CSF) to facilitate stem cell mobilization of lymphoma and myeloma patients. To evaluate the effectiveness and the related costs of a "just-in-time" strategy of plerixafor administration, we performed a retrospective cohort study comparing 148 consecutive lymphoma and myeloma patients in whom mobilization was attempted during 2008 before the Food and Drug Administration (FDA) approval of plerixafor with 188 consecutive patients mobilized during 2009 after FDA approval. Plerixafor was administered to 64 of 188 patients considered to be at risk for mobilization failure due to either their medical history ("high risk," n = 23) or the occurrence of peripheral blood CD34+ count of fewer than 15 × 10(6) cells/L with a white blood cell count of greater than 10 × 10(9) cells/L after at least 5 days of G-CSF administration (just-in-time, n = 41). The success rates of collecting a minimum transplant CD34+ cell dose (≥2 × 10(6) cells/kg) or target cell dose (≥5 × 10(6) lymphoma or ≥10 × 10(6) CD34+ cells/kg myeloma) in the just-in-time patients compared favorably with the 36 poor mobilizers collected with G-CSF alone: 93% versus 72% and 42% versus 22%, respectively. The use of plerixafor in selected high-risk patients and poor mobilizers did not increase the total charges associated with stem cell collection when compared with poor mobilizers treated with G-CSF alone. The targeted use of plerixafor increased the overall success rate of mobilizing a minimum number of CD34+ cells from 93% to 98% in patients with hematologic malignancies scheduled for autotransplant and increased the overall charges associated with stem cell collection in all patients by an average of 17%. © 2011 American Association of Blood Banks.

  12. Steroids In caRdiac Surgery (SIRS) trial: acute kidney injury substudy protocol of an international randomised controlled trial.

    PubMed

    Garg, Amit X; Vincent, Jessica; Cuerden, Meaghan; Parikh, Chirag; Devereaux, P J; Teoh, Kevin; Yusuf, Salim; Hildebrand, Ainslie; Lamy, Andre; Zuo, Yunxia; Sessler, Daniel I; Shah, Pallav; Abbasi, Seyed Hesameddin; Quantz, Mackenzie; Yared, Jean-Pierre; Noiseux, Nicolas; Tagarakis, Georgios; Rochon, Antoine; Pogue, Janice; Walsh, Michael; Chan, Matthew T V; Lamontagne, Francois; Salehiomran, Abbas; Whitlock, Richard

    2014-03-05

    Steroids In caRdiac Surgery trial (SIRS) is a large international randomised controlled trial of methylprednisolone or placebo in patients undergoing cardiac surgery with the use of a cardiopulmonary bypass pump. At the time of surgery, compared with placebo, methylprednisolone divided into two intravenous doses of 250 mg each may reduce the risk of postoperative acute kidney injury (AKI). With respect to the study schedule, over 7000 substudy eligible patients from 81 centres in 18 countries were randomised in December 2013. The authors will use a logistic regression to estimate the adjusted OR of methylprednisolone versus placebo on the primary outcome of AKI in the 14 days following surgery (a postoperative increase in serum creatinine of ≥50%, or ≥26.5 μmol/L, from the preoperative value). The stage of AKI will also be considered, as will the outcome of AKI in those with and without preoperative chronic kidney disease. After receipt of grant funding, the authors began to record additional perioperative serum creatinine measurements in consecutive patients enrolled at substudy participating centres, and patients were invited to enroll in a 6-month serum creatinine collection. In these trial subpopulations, the authors will consider the outcome of AKI defined in alternate ways, and the outcome of a 6-month change in kidney function from the preoperative value. The authors were competitively awarded a grant from the Canadian Institutes of Health Research for this SIRS AKI substudy. Ethics approval was obtained for additional serum creatinine recordings in consecutive patients enrolled at participating centres. The additional kidney data collection first began for patients enrolled after 1 March 2012. In patients who provided consent, the last 6-month kidney outcome data will be collected in 2014. The results will be reported no later than 2015. Number NCT00427388.

  13. 27 CFR 19.594 - Numbering of packages and cases in processing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... trade name, all series in use at that time shall be continued. However, for a change in proprietorship... spirits and denatured spirits shall, when filled, be consecutively numbered in a separate series by the proprietor commencing with “1” in each series of serial numbers, except that any series of such numbers in...

  14. Does Weather Matter? The Effect of Weather Patterns and Temporal Factors on Pediatric Orthopedic Trauma Volume

    PubMed Central

    Livingston, Kristin S.; Miller, Patricia E.; Lierhaus, Anneliese; Matheney, Travis H.; Mahan, Susan T.

    2016-01-01

    Objectives: Orthopaedists often speculate how weather and school schedule may influence pediatric orthopedic trauma volume, but few studies have examined this. This study aims to determine: how do weather patterns, day, month, season and public school schedule influence the daily frequency of pediatric orthopedic trauma consults and admissions? Methods: With IRB approval, orthopedic trauma data from a level 1 pediatric trauma center, including number of daily orthopedic trauma consults and admissions, were collected from July 2009 to March 2012. Historical weather data (high temperatures, precipitation and hours of daylight), along with local public school schedule data were collected for the same time period. Univariate and multivariate regression models were used to show the average number of orthopedic trauma consults and admissions as a function of weather and temporal variables. Results: High temperature, precipitation, month and day of the week significantly affected the number of daily consults and admissions. The number of consults and admissions increased by 1% for each degree increase in temperature (p=0.001 and p<0.001, respectively), and decreased by 21% for each inch of precipitation (p<0.001, p=0.006). Daily consults on snowy days decreased by an additional 16% compared to days with no precipitation. November had the lowest daily consult and admission rate, while September had the highest. Daily consult rate was lowest on Wednesdays and highest on Saturdays. Holiday schedule was not independently significant. Conclusion: Pediatric orthopedic trauma consultations and admissions are highly linked to temperature and precipitation, as well as day of the week and time of year. PMID:27990193

  15. Does Weather Matter? The Effect of Weather Patterns and Temporal Factors on Pediatric Orthopedic Trauma Volume.

    PubMed

    Livingston, Kristin S; Miller, Patricia E; Lierhaus, Anneliese; Matheney, Travis H; Mahan, Susan T

    2016-01-01

    Orthopaedists often speculate how weather and school schedule may influence pediatric orthopedic trauma volume, but few studies have examined this. This study aims to determine: how do weather patterns, day, month, season and public school schedule influence the daily frequency of pediatric orthopedic trauma consults and admissions? With IRB approval, orthopedic trauma data from a level 1 pediatric trauma center, including number of daily orthopedic trauma consults and admissions, were collected from July 2009 to March 2012. Historical weather data (high temperatures, precipitation and hours of daylight), along with local public school schedule data were collected for the same time period. Univariate and multivariate regression models were used to show the average number of orthopedic trauma consults and admissions as a function of weather and temporal variables. High temperature, precipitation, month and day of the week significantly affected the number of daily consults and admissions. The number of consults and admissions increased by 1% for each degree increase in temperature (p=0.001 and p<0.001, respectively), and decreased by 21% for each inch of precipitation (p<0.001, p=0.006). Daily consults on snowy days decreased by an additional 16% compared to days with no precipitation. November had the lowest daily consult and admission rate, while September had the highest. Daily consult rate was lowest on Wednesdays and highest on Saturdays. Holiday schedule was not independently significant. Pediatric orthopedic trauma consultations and admissions are highly linked to temperature and precipitation, as well as day of the week and time of year.

  16. Scheduling rules to achieve lead-time targets in outpatient appointment systems.

    PubMed

    Nguyen, Thu-Ba T; Sivakumar, Appa Iyer; Graves, Stephen C

    2017-12-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the request is not rejected, the rules prescribe how to assign the patient to an available slot. The intent of the scheduling rules is to maximize the utilization of the planned resource (i.e., the physician staff), or equivalently to maximize the number of patients that are admitted, while maintaining the service targets on the median, the 95th percentile, and the maximum appointment lead-times. We test the proposed scheduling rules with numerical experiments using real data from the chosen clinic of Tan Tock Seng hospital in Singapore. The results show the efficiency and the efficacy of the scheduling rules, in terms of the service-target satisfaction and the resource utilization. From the sensitivity analysis, we find that the performance of the proposed scheduling rules is fairly robust to the specification of the established lead-time targets.

  17. Secure Scientific Applications Scheduling Technique for Cloud Computing Environment Using Global League Championship Algorithm

    PubMed Central

    Abdulhamid, Shafi’i Muhammad; Abd Latiff, Muhammad Shafie; Abdul-Salaam, Gaddafi; Hussain Madni, Syed Hamid

    2016-01-01

    Cloud computing system is a huge cluster of interconnected servers residing in a datacenter and dynamically provisioned to clients on-demand via a front-end interface. Scientific applications scheduling in the cloud computing environment is identified as NP-hard problem due to the dynamic nature of heterogeneous resources. Recently, a number of metaheuristics optimization schemes have been applied to address the challenges of applications scheduling in the cloud system, without much emphasis on the issue of secure global scheduling. In this paper, scientific applications scheduling techniques using the Global League Championship Algorithm (GBLCA) optimization technique is first presented for global task scheduling in the cloud environment. The experiment is carried out using CloudSim simulator. The experimental results show that, the proposed GBLCA technique produced remarkable performance improvement rate on the makespan that ranges between 14.44% to 46.41%. It also shows significant reduction in the time taken to securely schedule applications as parametrically measured in terms of the response time. In view of the experimental results, the proposed technique provides better-quality scheduling solution that is suitable for scientific applications task execution in the Cloud Computing environment than the MinMin, MaxMin, Genetic Algorithm (GA) and Ant Colony Optimization (ACO) scheduling techniques. PMID:27384239

  18. Secure Scientific Applications Scheduling Technique for Cloud Computing Environment Using Global League Championship Algorithm.

    PubMed

    Abdulhamid, Shafi'i Muhammad; Abd Latiff, Muhammad Shafie; Abdul-Salaam, Gaddafi; Hussain Madni, Syed Hamid

    2016-01-01

    Cloud computing system is a huge cluster of interconnected servers residing in a datacenter and dynamically provisioned to clients on-demand via a front-end interface. Scientific applications scheduling in the cloud computing environment is identified as NP-hard problem due to the dynamic nature of heterogeneous resources. Recently, a number of metaheuristics optimization schemes have been applied to address the challenges of applications scheduling in the cloud system, without much emphasis on the issue of secure global scheduling. In this paper, scientific applications scheduling techniques using the Global League Championship Algorithm (GBLCA) optimization technique is first presented for global task scheduling in the cloud environment. The experiment is carried out using CloudSim simulator. The experimental results show that, the proposed GBLCA technique produced remarkable performance improvement rate on the makespan that ranges between 14.44% to 46.41%. It also shows significant reduction in the time taken to securely schedule applications as parametrically measured in terms of the response time. In view of the experimental results, the proposed technique provides better-quality scheduling solution that is suitable for scientific applications task execution in the Cloud Computing environment than the MinMin, MaxMin, Genetic Algorithm (GA) and Ant Colony Optimization (ACO) scheduling techniques.

  19. Dynamic Hierarchical Sleep Scheduling for Wireless Ad-Hoc Sensor Networks

    PubMed Central

    Wen, Chih-Yu; Chen, Ying-Chih

    2009-01-01

    This paper presents two scheduling management schemes for wireless sensor networks, which manage the sensors by utilizing the hierarchical network structure and allocate network resources efficiently. A local criterion is used to simultaneously establish the sensing coverage and connectivity such that dynamic cluster-based sleep scheduling can be achieved. The proposed schemes are simulated and analyzed to abstract the network behaviors in a number of settings. The experimental results show that the proposed algorithms provide efficient network power control and can achieve high scalability in wireless sensor networks. PMID:22412343

  20. Dynamic hierarchical sleep scheduling for wireless ad-hoc sensor networks.

    PubMed

    Wen, Chih-Yu; Chen, Ying-Chih

    2009-01-01

    This paper presents two scheduling management schemes for wireless sensor networks, which manage the sensors by utilizing the hierarchical network structure and allocate network resources efficiently. A local criterion is used to simultaneously establish the sensing coverage and connectivity such that dynamic cluster-based sleep scheduling can be achieved. The proposed schemes are simulated and analyzed to abstract the network behaviors in a number of settings. The experimental results show that the proposed algorithms provide efficient network power control and can achieve high scalability in wireless sensor networks.

  1. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  2. [Childhood immunization schedule of the Spanish Association of Pediatrics 2003].

    PubMed

    2003-03-01

    In this document the Advisory Committee on Vaccines of the Spanish Association of Pediatrics provides recommendations for the immunization schedule for the 2003-2004 season. The use of inactivated poliovirus vaccine is again stressed for children of any age. Moreover, the introduction of the varicella vaccine and the pneumococcal conjugated vaccine, as well as the option of dTpa in adolescents, is highly recommended due to the availability of safe and effective products. Because of the increasing number of new vaccines in the immunization schedule, strategies with combined vaccines must be used.

  3. Analytics for vaccine economics and pricing: insights and observations.

    PubMed

    Robbins, Matthew J; Jacobson, Sheldon H

    2015-04-01

    Pediatric immunization programs in the USA are a successful and cost-effective public health endeavor, profoundly reducing mortalities caused by infectious diseases. Two important issues relate to the success of the immunization programs, the selection of cost-effective vaccines and the appropriate pricing of vaccines. The recommended childhood immunization schedule, published annually by the CDC, continues to expand with respect to the number of injections required and the number of vaccines available for selection. The advent of new vaccines to meet the growing requirements of the schedule results: in a large, combinatorial number of possible vaccine formularies. The expansion of the schedule and the increase in the number of available vaccines constitutes a challenge for state health departments, large city immunization programs, private practices and other vaccine purchasers, as a cost-effective vaccine formulary must be selected from an increasingly large set of possible vaccine combinations to satisfy the schedule. The pediatric vaccine industry consists of a relatively small number of pharmaceutical firms engaged in the research, development, manufacture and distribution of pediatric vaccines. The number of vaccine manufacturers has dramatically decreased in the past few decades for a myriad of reasons, most notably due to low profitability. The contraction of the industry negatively impacts the reliable provision of pediatric vaccines. The determination of appropriate vaccine prices is an important issue and influences a vaccine manufacturer's decision to remain in the market. Operations research is a discipline that applies advanced analytical methods to improve decision making; analytics is the application of operations research to a particular problem using pertinent data to provide a practical result. Analytics provides a mechanism to resolve the challenges facing stakeholders in the vaccine development and delivery system, in particular, the selection of cost-effective vaccines and the appropriate pricing of vaccines. A review of applicable analytics papers is provided.

  4. Characterization of Tactical Departure Scheduling in the National Airspace System

    NASA Technical Reports Server (NTRS)

    Capps, Alan; Engelland, Shawn A.

    2011-01-01

    This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.

  5. Reducing elective general surgery cancellations at a Canadian hospital

    PubMed Central

    Azari-Rad, Solmaz; Yontef, Alanna L.; Aleman, Dionne M.; Urbach, David R.

    2013-01-01

    Background In Canadian hospitals, which are typically financed by global annual budgets, overuse of operating rooms is a financial risk that is frequently managed by cancelling elective surgical procedures. It is uncertain how different scheduling rules affect the rate of elective surgery cancellations. Methods We used discrete event simulation modelling to represent perioperative processes at a hospital in Toronto, Canada. We tested the effects of the following 3 scenarios on the number of surgical cancellations: scheduling surgeons’ operating days based on their patients’ average length of stay in hospital, sequencing surgical procedures by average duration and variance, and increasing the number of post-surgical ward beds. Results The number of elective cancellations was reduced by scheduling surgeons whose patients had shorter average lengths of stay in hospital earlier in the week, sequencing shorter surgeries and those with less variance in duration earlier in the day, and by adding up to 2 additional beds to the postsurgical ward. Conclusion Discrete event simulation modelling can be used to develop strategies for improving efficiency in operating rooms. PMID:23351498

  6. Scheduling admissions and reducing variability in bed demand.

    PubMed

    Bekker, René; Koeleman, Paulien M

    2011-09-01

    Variability in admissions and lengths of stay inherently leads to variability in bed occupancy. The aim of this paper is to analyse the impact of these sources of variability on the required amount of capacity and to determine admission quota for scheduled admissions to regulate the occupancy pattern. For the impact of variability on the required number of beds, we use a heavy-traffic limit theorem for the G/G/∞ queue yielding an intuitively appealing approximation in case the arrival process is not Poisson. Also, given a structural weekly admission pattern, we apply a time-dependent analysis to determine the mean offered load per day. This time-dependent analysis is combined with a Quadratic Programming model to determine the optimal number of elective admissions per day, such that an average desired daily occupancy is achieved. From the mathematical results, practical scenarios and guidelines are derived that can be used by hospital managers and support the method of quota scheduling. In practice, the results can be implemented by providing admission quota prescribing the target number of admissions for each patient group.

  7. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    PubMed

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  8. The Four Day School Week: An Investigation and Analysis.

    ERIC Educational Resources Information Center

    Grau, Elnabeth; Shaughnessy, Michael F.

    Students in about 100 schools in 10 states attend classes 4 days a week, for all or part of the school year. A growing number of rural schools, faced with declining enrollments and diminishing state aid, are experimenting with this schedule. Benefits of the schedule include lower energy and transportation costs and lower absenteeism among students…

  9. 76 FR 24467 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... Schedule A Image to be effective 12/20/2010. Filed Date: 04/25/2011. Accession Number: 20110425-5169... per Order in ER11-2750-000 to resubmit the Schedule A Image to be effective 12/28/2010. Filed Date: 04... (toll free). For TTY, call (202) 502-8659. Dated: April 26, 2011. Nathaniel J. Davis, Sr., Deputy...

  10. 75 FR 24689 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Label Surface Coating Operations (Renewal), EPA ICR Number 0658.10, OMB Control Number 2060-0004 AGENCY... Number 2060-0004. ICR Status: This ICR is scheduled to expire on May 31, 2010. Under OMB regulations, the...

  11. 75 FR 20836 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Coating and Printing (Renewal), EPA ICR Number 1157.09, OMB Control Number 2060-0073 AGENCY: Environmental....09, OMB Control Number 2060-0073. ICR Status: This ICR is scheduled to expire on May 31, 2010. Under...

  12. Scheduling Diet for Diabetes Mellitus Patients using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Felicia, V.; Rahmat, R. F.; Budiarto, R.

    2017-01-01

    Diabetes Melitus (DM) is one of metabolic diseases which affects on productivity and lowers the human resources quality. This disease can be controlled by maintaining and regulating balanced and healthy lifestyle especially for daily diet. However, nowadays, there is no system able to help DM patient to get any information of proper diet. Therefore, an approach is required to provide scheduling diet every day in a week with appropriate nutrition for DM patients to help them regulate their daily diet for healing this disease. In this research, we calculate the number of caloric needs using Harris-Benedict equation and propose genetic algorithm for scheduling diet for DM patient. The results show that the greater the number of individuals, the greater the more the possibility of changes in fitness score approaches the best fitness score. Moreover, the greater the created generation, the more the opportunites to obtain best individual with fitness score approaching 0 or equal to 0.

  13. Flow cytometric method for scoring rat liver micronuclei with simultaneous assessments of hepatocyte proliferation.

    PubMed

    Avlasevich, Svetlana L; Khanal, Sumee; Singh, Priyanka; Torous, Dorothea K; Bemis, Jeffrey C; Dertinger, Stephen D

    2018-04-01

    The current report describes a newly devised method for automatically scoring the incidence of rat hepatocyte micronuclei (MNHEP) via flow cytometry, with concurrent assessments of hepatocyte proliferation-frequency of Ki-67-positive nuclei, and the proportion of polyploid nuclei. Proof-of-concept data are provided from experiments performed with 6-week old male Crl:CD(SD) rats exposed to diethylnitrosamine (DEN) or quinoline (QUIN) for 3 or 14 consecutive days. Non-perfused liver tissue was collected 4 days after cessation of treatment in the case of 3-day studies, or 1 day after last administration in the case of 14-day studies for processing and flow cytometric analysis. In addition to livers, blood samples were collected one day after final treatment for micronucleated reticulocyte (MN-RET) measurements. Dose-dependent increases in MNHEP, Ki-67-positive nuclei, and polyploidy were observed in 3- and 14-day DEN studies. Both treatment schedules resulted in elevated %MNHEP for QUIN-exposed rats, and while cell proliferation effects were subtle, appreciable increases to normalized liver weights were observed. Whereas DEN caused markedly higher %MNHEP when exposure was extended to two weeks, QUIN-induced MNHEP were slightly increased with protracted dosing. Parallel microscopy-based MNHEP frequencies were highly correlated with flow cytometry-based measurements (four study/aggregate R 2  = 0.80). No increases in MN-RET were seen in any of the four studies. Collectively, these results suggest liver micronuclei are amenable to an automated scoring technique that provides objective analyses and higher information content relative to conventional microscopy. Additional work is needed to expand the number and types of chemicals tested, identify the most advantageous treatment schedules, and test the transferability of the method. Environ. Mol. Mutagen. 59:176-187, 2018. © 2018 Wiley Periodicals, Inc. © 2018 Wiley Periodicals, Inc.

  14. Use of e-mail for Parkinson's disease consultations: Are answers just a clic away?

    PubMed

    Viedma-Guiard, E; Agüero, P; Crespo-Araico, L; Estévez-Fraga, C; Sánchez-Díez, G; López-Sendón, J L; Aviles-Olmos, I; García-Ribas, G; Palacios Romero, M L; Masjuan Vallejo, J; Martínez-Castrillo, J C; Alonso-Cánovas, A

    2018-03-01

    The clinical problems of patients with movement disorders (MD) are complex, and the duration and frequency of face-to-face consultations may be insufficient to meet their needs. We analysed the implementation of an e-mail-based query service for our MD unit's patients and their primary care physicians (PCPs). We retrospectively reviewed all consecutive emails sent and received over a period of 4 months, one year after implementation of the e-mail inquiry system. All patients received the during consultations, and PCPs, during scheduled informative meetings. We recorded and later analysed the profile of the questioner, patients' demographic and clinical data, number of queries, reason for consultation, and actions taken. From 1 January 2015 to 30 April 2015, the service received 137 emails from 63 patients (43% male, mean age 71±10.5) diagnosed with Parkinson's disease (76%), atypical parkinsonism (10%), and others (14%); 116 responses were sent. Twenty (32%) emails were written by patients, 38 (60%) by their caregivers, and 5 (8%) by their PCPs. The reasons for consultation were clinical in 50 cases (80%): 16 (32%) described clinical deterioration, 14 (28%) onset of new symptoms, and 20 (40%) side effects or concerns about medications. In 13 cases (20%), the query was bureaucratic: 11 were related to appointments (85%) and 2 were requests for clinical reports (15%). In response, new appointments were scheduled in 9 cases (14%), while the rest of the questions were answered by email. Patients were satisfied overall and the additional care burden on specialists was not excessive. Implementing an e-mail-based consultation system is feasible in MD units. It facilitates both communication between neurologists and patients and continued care in the primary care setting. Copyright © 2016 Sociedad Española de Neurología. Publicado por Elsevier España, S.L.U. All rights reserved.

  15. Parameters of control when facing stochastic demand: a DEA approach applied to Bangladeshi vaccination sites.

    PubMed

    Dervaux, B; Leleu, H; Valdmanis, V; Walker, D

    2003-12-01

    An aim of vaccination programs is near-complete coverage. One method for achieving this is for health facilities providing these services to operate frequently and for many hours during each session. However, if vaccine vials are not fully used, the remainder is often discarded, considered as waste. Without an active appointment schedule process, there is no way for facility staff to control the stochastic demand of potential patients, and hence reduce waste. And yet reducing the hours of operation or number of sessions per week could hinder access to vaccination services. In lieu of any formal system of controlling demand, we propose to model the optimal number of hours and sessions in order to maximize outputs, the number and type of vaccines provided given inputs, using Data Envelopment Analysis (DEA). Inputs are defined as the amount of vaccine wastage and the number of full-time equivalent staff, size of the facility, number of hours of operation and the number of sessions. Outputs are defined as the number and type of vaccines aimed at children and pregnant women. This analysis requires two models: one DEA model with possible reallocations between the number of hours and the number of sessions but with the total amount of time fixed and one model without this kind of reallocation in scheduling. Comparing these two scores we can identify the "gain" that would be possible were the scheduling of hours and sessions modified while controlling for all other types of inefficiency. By modeling an output-based model, we maintain the objective of increasing coverage while assisting decision-makers determining optimal operating processes.

  16. Prevalence and risk factors for renal scars in children with febrile UTI and/or VUR: A cross-sectional observational study of 565 consecutive patients

    PubMed Central

    Snodgrass, Warren T.; Shah, Anjana; Yang, Mary; Kwon, Jeannie; Villanueva, Carlos; Traylor, Janelle; Pritzker, Karen; Nakonezny, Paul A.; Haley, Robert W.; Bush, Nicol Corbin

    2013-01-01

    Purpose To determine prevalence and risk factors for renal scar in children referred for urologic assessment of febrile UTI and/or VUR. Methods Pre-determined risk factors for renal scar were prospectively recorded in consecutive patients referred for UTI/VUR. Age, gender, VUR grade, and reported number of febrile and non-febrile UTIs were analyzed with logistic regression to determine risk for focal cortical defects on non-acute DMSA. Results Of 565 consecutive children, 24 (4%) had congenital renal dysplasia and 84 (15.5%) had focal defect(s). VUR, especially grades IV–V, recurrent febrile UTI, and older age increased risk. For any age child with the same number of UTIs, VUR increased odds of renal defect 5.4-fold (OR = 5.4, 95% CI = 2.7–10.6, AUC = 0.759). Conclusions Focal DMSA defects were present in 15.5% of 565 consecutive children referred for febrile UTI and/or VUR; 4% had presumed congenital reflux nephropathy without cortical defect. All VUR grades increased risk for these defects, as did recurrent febrile UTIs and older age. However, 43% with grades IV–V VUR and 76% with recurrent UTI had normal DMSA. PMID:23465483

  17. Prevalence and risk factors for renal scars in children with febrile UTI and/or VUR: a cross-sectional observational study of 565 consecutive patients.

    PubMed

    Snodgrass, Warren T; Shah, Anjana; Yang, Mary; Kwon, Jeannie; Villanueva, Carlos; Traylor, Janelle; Pritzker, Karen; Nakonezny, Paul A; Haley, Robert W; Bush, Nicol Corbin

    2013-12-01

    To determine prevalence and risk factors for renal scar in children referred for urologic assessment of febrile UTI and/or VUR. Pre-determined risk factors for renal scar were prospectively recorded in consecutive patients referred for UTI/VUR. Age, gender, VUR grade, and reported number of febrile and non-febrile UTIs were analyzed with logistic regression to determine risk for focal cortical defects on non-acute DMSA. Of 565 consecutive children, 24 (4%) had congenital renal dysplasia and 84 (15.5%) had focal defect(s). VUR, especially grades IV-V, recurrent febrile UTI, and older age increased risk. For any age child with the same number of UTIs, VUR increased odds of renal defect 5.4-fold (OR = 5.4, 95% CI = 2.7-10.6, AUC = 0.759). Focal DMSA defects were present in 15.5% of 565 consecutive children referred for febrile UTI and/or VUR; 4% had presumed congenital reflux nephropathy without cortical defect. All VUR grades increased risk for these defects, as did recurrent febrile UTIs and older age. However, 43% with grades IV-V VUR and 76% with recurrent UTI had normal DMSA. Published by Elsevier Ltd.

  18. Use of SMS text messaging to improve outpatient attendance.

    PubMed

    Downer, Sean R; Meara, John G; Da Costa, Annette C

    2005-10-03

    To evaluate the effect of appointment reminders sent as short message service (SMS) text messages to patients' mobile telephones on attendance at outpatient clinics. Cohort study with historical control. Royal Children's Hospital, Melbourne, Victoria. Patients who gave a mobile telephone contact number and were scheduled to attend any of five outpatient clinics (dermatology, gastroenterology, general medicine, paediatric dentistry and plastic surgery) in September (trial group) or August (control group), 2004. Failure to attend (FTA) rate compared between the group sent a reminder and those who were not. 2151 patients were scheduled to attend a clinic in September; 1382 of these (64.2%) gave a mobile telephone contact number and were sent an SMS reminder (trial group). Corresponding numbers in the control group were 2276 scheduled to attend and 1482 (65.1%) who gave a mobile telephone number. The FTA rate for individual clinics was 12%-16% for the trial group, and 19%-39% for the control group. Overall FTA rate was significantly lower in the trial group than in the control group (14.2% v 23.4%; P < 0.001). The observed reduction in failure to attend rate was in line with that found using traditional reminder methods. The ease with which large numbers of messages can be customised and sent by SMS text messaging, along with its availability and comparatively low cost, suggest it may be a suitable means of improving patient attendance.

  19. 48 CFR 15.204-2 - Part I-The Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the solicitation: (i) Name, address, and location of issuing activity, including room and building.... Include a brief description of the supplies or services; e.g., item number, national stock number/part...

  20. Stochastic scheduling on a repairable manufacturing system

    NASA Astrophysics Data System (ADS)

    Li, Wei; Cao, Jinhua

    1995-08-01

    In this paper, we consider some stochastic scheduling problems with a set of stochastic jobs on a manufacturing system with a single machine that is subject to multiple breakdowns and repairs. When the machine processing a job fails, the job processing must restart some time later when the machine is repaired. For this typical manufacturing system, we find the optimal policies that minimize the following objective functions: (1) the weighed sum of the completion times; (2) the weighed number of late jobs having constant due dates; (3) the weighted number of late jobs having random due dates exponentially distributed, which generalize some previous results.

  1. An Optimization of Manufacturing Systems using a Feedback Control Scheduling Model

    NASA Astrophysics Data System (ADS)

    Ikome, John M.; Kanakana, Grace M.

    2018-03-01

    In complex production system that involves multiple process, unplanned disruption often turn to make the entire production system vulnerable to a number of problems which leads to customer’s dissatisfaction. However, this problem has been an ongoing problem that requires a research and methods to streamline the entire process or develop a model that will address it, in contrast to this, we have developed a feedback scheduling model that can minimize some of this problem and after a number of experiment, it shows that some of this problems can be eliminated if the correct remedial actions are implemented on time.

  2. Influence of sleep and meal schedules on performance peaks in competitive sprinters.

    PubMed

    Javierre, C; Calvo, M; Díez, A; Garrido, E; Segura, R; Ventura, J L

    1996-08-01

    The influence of sleep and meal schedules on performance in short distance running was assessed in a group of 8 national-class competition male sprinters. They were tested on Saturdays for five consecutive weeks. On each testing day, the performance time for an 80 m sprint was registered on eight different occasions during days 1 and 4, on 9 occasions on days 2 and 5, and on 7 occasions on day 3. On control days (days 1 and 4) performance gradually improved during the morning up to 13:00 h, decreased at 15:00 h, and again improved thereafter, with a maximum peak performance at 19:00 h. On day 2, in which sleep/wake cycles and meal-times were advanced for two hours, and on day 3, in which timetables were delayed for two hours, maximum peak performance was observed at 17:00 h and 21:00 h, respectively. At the time of maximum peak performance on both days a statistically significant improvement was observed as compared with the control day (day 2, p < 0.01; day 3, p = 0.001). On day 5, in which only the sleep/wake cycle was advanced for two hours, performance in the afternoon and evening was similar to that recorded on days 1 and 4. We observed that easy manipulation of sleep and meal schedules would allow competitive sprinters to synchronize peak power output with the time of the athletic event, increasing the chances for improvement in performance.

  3. Developing a schedule to identify social communication difficulties and autism spectrum disorder in young children with visual impairment.

    PubMed

    Absoud, Michael; Parr, Jeremy R; Salt, Alison; Dale, Naomi

    2011-03-01

    Available observational tools used in the identification of social communication difficulties and diagnosis of autism spectrum disorder (ASD) rely partly on visual behaviours and therefore may not be valid in children with visual impairment. A pilot observational instrument, the Visual Impairment and Social Communication Schedule (VISS), was developed to aid in identifying social communication difficulties and ASD in young children with visual impairment affected by congenital disorders of the peripheral visual system (disorders of the globe, retina, and anterior optic nerve). The VISS was administered to 23 consecutive children (age range 1 y 9 mo-6 y 11 mo, mean 4 y 1 mo [SD 1.6]; 12 males, 11 females) with visual impairment (nine with severe and 14 with profound visual impairment). Item analysis was carried out by fit of the items to the Rasch model. Validity of the VISS was explored by comparison with the Childhood Autism Rating Scale (CARS) score, and the clinical ASD diagnosis (n=9). Correlation between the VISS and CARS total scores was highly significant (Spearman's rho=-0.89; p=0.01). Below threshold rating on the VISS (score of 35) showed good agreement with the clinical ASD diagnosis (sensitivity 89%, specificity 100%). This preliminary study shows the VISS to be a promising schedule to aid the identification of ASD in young children with visual impairment. © The Authors. Journal compilation © Mac Keith Press 2010.

  4. Reliability of DSM-III anxiety disorder categories using a new structured interview.

    PubMed

    Di Nardo, P A; O'Brien, G T; Barlow, D H; Waddell, M T; Blanchard, E B

    1983-10-01

    The reliability of DSM-III anxiety disorder diagnoses was determined using a new structured interview, the Anxiety Disorders Interview Schedule (ADIS). Two interviewers examined 60 consecutive outpatients at an anxiety disorders clinic and assigned primary and secondary diagnoses based on the ADIS. The kappa statistic, calculated on the basis of perfect matches on primary diagnoses, indicated good agreement for anxiety, affective, and adjustment disorders, as well as for the specific anxiety disorder categories of agoraphobia, panic, social phobia, and obsessive-compulsive disorder, but not for generalized anxiety disorder. We evaluated the causes for diagnostic disagreement, particularly in relation to the difficult differentiation between generalized anxiety disorder and other anxiety disorders.

  5. STS-78 Flight Day 8

    NASA Technical Reports Server (NTRS)

    1996-01-01

    On this eighth day of the STS-78 mission, the flight crew, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Ph.D. and Robert B. Thirsk, M.D., continue to conduct experiments primarily focusing on the effects of weightlessness on human physiology. Results from the studies of muscle activity, task performance, and sleep will help future mission planners organize crew schedules for greater efficiency and productivity. For a second consecutive day, Henricks, Kregel, Thirsk, and Favier continue to enter responses to a battery of problem-solving tasks on the Performance Assessment Work Station, a laptop computer.

  6. Optimal recombination in genetic algorithms for flowshop scheduling problems

    NASA Astrophysics Data System (ADS)

    Kovalenko, Julia

    2016-10-01

    The optimal recombination problem consists in finding the best possible offspring as a result of a recombination operator in a genetic algorithm, given two parent solutions. We prove NP-hardness of the optimal recombination for various variants of the flowshop scheduling problem with makespan criterion and criterion of maximum lateness. An algorithm for solving the optimal recombination problem for permutation flowshop problems is built, using enumeration of prefect matchings in a special bipartite graph. The algorithm is adopted for the classical flowshop scheduling problem and for the no-wait flowshop problem. It is shown that the optimal recombination problem for the permutation flowshop scheduling problem is solvable in polynomial time for almost all pairs of parent solutions as the number of jobs tends to infinity.

  7. Patients' adherence to aspects of haemodialysis regimens in tropical north Queensland, Australia.

    PubMed

    Smyth, Wendy; Hartig, Vicki; Hayes, Megan; Manickam, Valli

    2015-06-01

    Patients with end-stage kidney disease often have difficulty in adhering to aspects of their haemodialysis regimens. This study aimed to quantify the number of patients who attended 100% of their scheduled haemodialysis sessions, and the number of patients who gained no more than one kilogram per day between dialysis sessions, over a three-month period. Retrospective chart audit Patients undergoing haemodialysis at an in-hospital centre in tropical Australia. A renal nurse audited the 72 charts pertaining to a 12-week period in 2013. Patients attended 90.1% of all scheduled dialysis sessions. Forty-one patients attended all sessions, with the remaining 31 missing at least one scheduled session. One patient missed 16 scheduled sessions. The following were statistically less likely to attend all their scheduled sessions: Aboriginal and Torres Strait Islander patients; patients on a three times per week dialysis schedule; patients who had relocated from rural or regional towns and younger patients. The average daily weight gain ranged from 0.414 kg to 1.017 kg (mean = 0.885 kg). Younger patients were statistically less likely to adhere to fluid restrictions; patients without diabetes were more likely to adhere to the fluid allowances. Renal services need to assist patients to adhere to their regimens. Initially, this service will examine strategies to maximise the likelihood of patients attending all of their dialysis sessions. Such an outcome will help to delay deterioration in the patients' health status, while minimising additional strain on the health service. © 2015 European Dialysis and Transplant Nurses Association/European Renal Care Association.

  8. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  9. Market-Based Approaches to Managing Science Return from Planetary Missions

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Porter, David; Hanson, Robin

    1996-01-01

    A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.

  10. Particle swarm optimization based space debris surveillance network scheduling

    NASA Astrophysics Data System (ADS)

    Jiang, Hai; Liu, Jing; Cheng, Hao-Wen; Zhang, Yao

    2017-02-01

    The increasing number of space debris has created an orbital debris environment that poses increasing impact risks to existing space systems and human space flights. For the safety of in-orbit spacecrafts, we should optimally schedule surveillance tasks for the existing facilities to allocate resources in a manner that most significantly improves the ability to predict and detect events involving affected spacecrafts. This paper analyzes two criteria that mainly affect the performance of a scheduling scheme and introduces an artificial intelligence algorithm into the scheduling of tasks of the space debris surveillance network. A new scheduling algorithm based on the particle swarm optimization algorithm is proposed, which can be implemented in two different ways: individual optimization and joint optimization. Numerical experiments with multiple facilities and objects are conducted based on the proposed algorithm, and simulation results have demonstrated the effectiveness of the proposed algorithm.

  11. Competitive On-Line Scheduling for Overloaded Real-Time Systems

    DTIC Science & Technology

    1993-09-01

    Real - Time Systems by Gilad Koren a dissertation submitted in partial fulfillment of the requirements...Overloaded Real - Time Systems 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...1.1 Introduction : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 2 1.1.1 Real - Time Systems : : : : : : : : : : : : : : : : : : : : : : : : : : : :

  12. TRU Waste Management Program cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less

  13. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    NASA Astrophysics Data System (ADS)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  14. 5 CFR 532.203 - Structure of regular wage schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... grade; (3) NA means a nonappropriated fund nonsupervisory grade; and (4) NL means a nonappropriated fund... schedule for the area, plus 20 percent of the rate for step 2 of NA-8; (2) For grades NS-9 through NS-15... percent, respectively, above the step 2 rate of NA-15; (f) The number of within-grade steps and the...

  15. 77 FR 57192 - Proposed Collection; Comment Request for Form 5735 and Schedule P (Form 5735)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... Schedule P (Form 5735), Allocation of Income and Expenses Under Section 936(h)(5). DATES: Written comments should be received on or before November 16, 2012 to be assured of consideration. ADDRESSES: Direct all... and 30A), and Allocation of Income and Expenses Under Section 936(h)(5). OMB Number: 1545-0217. Form...

  16. Spatial analysis of fuel treatment options for chaparral on the Angeles national forest

    Treesearch

    G. Jones; J. Chew; R. Silverstein; C. Stalling; J. Sullivan; J. Troutwine; D. Weise; D. Garwood

    2008-01-01

    Spatial fuel treatment schedules were developed for the chaparral vegetation type on the Angeles National Forest using the Multi-resource Analysis and Geographic Information System (MAGIS). Schedules varied by the priority given to various wildland urban interface areas and the general forest, as well as by the number of acres treated per decade. The effectiveness of...

  17. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem

    PubMed Central

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  18. Optimization of municipal waste collection scheduling and routing using vehicle assignment problem (case study of Surabaya city waste collection)

    NASA Astrophysics Data System (ADS)

    Ramdhani, M. N.; Baihaqi, I.; Siswanto, N.

    2018-04-01

    Waste collection and disposal become a major problem for many metropolitan cities. Growing population, limited vehicles, and increased road traffic make the waste transportation become more complex. Waste collection involves some key considerations, such as vehicle assignment, vehicle routes, and vehicle scheduling. In the scheduling process, each vehicle has a scheduled departure that serve each route. Therefore, vehicle’s assignments should consider the time required to finish one assigment on that route. The objective of this study is to minimize the number of vehicles needed to serve all routes by developing a mathematical model which uses assignment problem approach. The first step is to generated possible routes from the existing routes, followed by vehicle assignments for those certain routes. The result of the model shows fewer vehicles required to perform waste collection asa well as the the number of journeys that the vehicle to collect the waste to the landfill. The comparison of existing conditions with the model result indicates that the latter’s has better condition than the existing condition because each vehicle with certain route has an equal workload, all the result’s model has the maximum of two journeys for each route.

  19. 48 CFR 1846.672-1 - Preparation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1846.672-1.../OF. Consecutively number the pages comprising the MIRR. On each page, enter the total number of pages... of the item nomenclature and, if provided, the Government-assigned management/material control code...

  20. Potential impact of 1.5 °C and 2 °C global warming on consecutive dry and wet days over West Africa

    NASA Astrophysics Data System (ADS)

    Ama Browne Klutse, Nana; Ajayi, Vincent O.; Olabode Gbobaniyi, Emiola; Egbebiyi, Temitope S.; Kouadio, Kouakou; Nkrumah, Francis; Akumenyi Quagraine, Kwesi; Olusegun, Christiana; Diasso, Ulrich; Abiodun, Babatunde J.; Lawal, Kamoru; Nikulin, Grigory; Lennard, Christopher; Dosio, Alessandro

    2018-05-01

    We examine the impact of +1.5 °C and +2 °C global warming levels above pre-industrial levels on consecutive dry days (CDD) and consecutive wet days (CWD), two key indicators for extreme precipitation and seasonal drought. This is done using climate projections from a multi-model ensemble of 25 regional climate model (RCM) simulations. The RCMs take boundary conditions from ten global climate models (GCMs) under the RCP8.5 scenario. We define CDD as the maximum number of consecutive days with rainfall amount less than 1 mm and CWD as the maximum number of consecutive days with rainfall amount more than 1 mm. The differences in model representations of the change in CDD and CWD, at 1.5 °C and 2 °C global warming, and based on the control period 1971‑2000 are reported. The models agree on a noticeable response to both 1.5 °C and 2 °C warming for each index. Enhanced warming results in a reduction in mean rainfall across the region. More than 80% of ensemble members agree that CDD will increase over the Guinea Coast, in tandem with a projected decrease in CWD at both 1.5 °C and 2 °C global warming levels. These projected changes may influence already fragile ecosystems and agriculture in the region, both of which are strongly affected by mean rainfall and the length of wet and dry periods.

  1. New VLBI2010 scheduling strategies and implications on the terrestrial reference frames.

    PubMed

    Sun, Jing; Böhm, Johannes; Nilsson, Tobias; Krásná, Hana; Böhm, Sigrid; Schuh, Harald

    In connection with the work for the next generation VLBI2010 Global Observing System (VGOS) of the International VLBI Service for Geodesy and Astrometry, a new scheduling package (Vie_Sched) has been developed at the Vienna University of Technology as a part of the Vienna VLBI Software. In addition to the classical station-based approach it is equipped with a new scheduling strategy based on the radio sources to be observed. We introduce different configurations of source-based scheduling options and investigate the implications on present and future VLBI2010 geodetic schedules. By comparison to existing VLBI schedules of the continuous campaign CONT11, we find that the source-based approach with two sources has a performance similar to the station-based approach in terms of number of observations, sky coverage, and geodetic parameters. For an artificial 16 station VLBI2010 network, the source-based approach with four sources provides an improved distribution of source observations on the celestial sphere. Monte Carlo simulations yield slightly better repeatabilities of station coordinates with the source-based approach with two sources or four sources than the classical strategy. The new VLBI scheduling software with its alternative scheduling strategy offers a promising option with respect to applications of the VGOS.

  2. New VLBI2010 scheduling strategies and implications on the terrestrial reference frames

    NASA Astrophysics Data System (ADS)

    Sun, Jing; Böhm, Johannes; Nilsson, Tobias; Krásná, Hana; Böhm, Sigrid; Schuh, Harald

    2014-05-01

    In connection with the work for the next generation VLBI2010 Global Observing System (VGOS) of the International VLBI Service for Geodesy and Astrometry, a new scheduling package (Vie_Sched) has been developed at the Vienna University of Technology as a part of the Vienna VLBI Software. In addition to the classical station-based approach it is equipped with a new scheduling strategy based on the radio sources to be observed. We introduce different configurations of source-based scheduling options and investigate the implications on present and future VLBI2010 geodetic schedules. By comparison to existing VLBI schedules of the continuous campaign CONT11, we find that the source-based approach with two sources has a performance similar to the station-based approach in terms of number of observations, sky coverage, and geodetic parameters. For an artificial 16 station VLBI2010 network, the source-based approach with four sources provides an improved distribution of source observations on the celestial sphere. Monte Carlo simulations yield slightly better repeatabilities of station coordinates with the source-based approach with two sources or four sources than the classical strategy. The new VLBI scheduling software with its alternative scheduling strategy offers a promising option with respect to applications of the VGOS.

  3. An Integrated Approach to Locality-Conscious Processor Allocation and Scheduling of Mixed-Parallel Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vydyanathan, Naga; Krishnamoorthy, Sriram; Sabin, Gerald M.

    2009-08-01

    Complex parallel applications can often be modeled as directed acyclic graphs of coarse-grained application-tasks with dependences. These applications exhibit both task- and data-parallelism, and combining these two (also called mixedparallelism), has been shown to be an effective model for their execution. In this paper, we present an algorithm to compute the appropriate mix of task- and data-parallelism required to minimize the parallel completion time (makespan) of these applications. In other words, our algorithm determines the set of tasks that should be run concurrently and the number of processors to be allocated to each task. The processor allocation and scheduling decisionsmore » are made in an integrated manner and are based on several factors such as the structure of the taskgraph, the runtime estimates and scalability characteristics of the tasks and the inter-task data communication volumes. A locality conscious scheduling strategy is used to improve inter-task data reuse. Evaluation through simulations and actual executions of task graphs derived from real applications as well as synthetic graphs shows that our algorithm consistently generates schedules with lower makespan as compared to CPR and CPA, two previously proposed scheduling algorithms. Our algorithm also produces schedules that have lower makespan than pure taskand data-parallel schedules. For task graphs with known optimal schedules or lower bounds on the makespan, our algorithm generates schedules that are closer to the optima than other scheduling approaches.« less

  4. Re-scheduling as a tool for the power management on board a spacecraft

    NASA Technical Reports Server (NTRS)

    Albasheer, Omar; Momoh, James A.

    1995-01-01

    The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

  5. The Effect of a Federal Controlled Substance Act Schedule Change on Hydrocodone Combination Products Claims in a Medicaid Population.

    PubMed

    Tran, Stephanie; Lavitas, Pavel; Stevens, Karen; Greenwood, Bonnie C; Clements, Karen; Alper, Caroline J; Lenz, Kimberly; Price, Mylissa; Hydery, Tasmina; Arnold, Jennifer L; Takeshita, Mito; Bacon, Rachel; Peristere, Justin P; Jeffrey, Paul L

    2017-05-01

    In 2012, hydrocodone combination products (HCPs) were the most prescribed medications in the United States. Under the Controlled Substance Act of 1970, hydrocodone alone was classified as a Schedule II drug, while HCPs were classified as Schedule III, indicating a lower risk for abuse and misuse. However, according to a Drug Enforcement Agency analysis, the addition of nonopioids has not been shown to diminish abuse potential of hydrocodone. In response to concerns for drug abuse and overdose, the Drug Enforcement Agency rescheduled HCPs to Schedule II in October 2014, with the intent of limiting overprescribing and increasing awareness of their abuse potential. However, it is unknown whether this has affected the overall claims for HCPs in a Medicaid population. To (a) compare the trend in HCP prescription claims with select non-HCP (opioid and nonopioid) analgesic claims before and after the HCP schedule change in the Massachusetts Medicaid fee-for-service/Primary Care Clinician plan population and (b) identify if there was a change in HCP new start member and claim characteristics before and after the HCP schedule change. This quasi-experimental, retrospective study used enrollment and pharmacy claims data to evaluate all members in the study population 1 year before and after the HCP schedule change. The number of claims for HCPs and select non-HCP analgesics was reported as the monthly rate per total population, and an interrupted time series analysis compared the change in the monthly rate of claims across groups. Members with 1 or more pharmacy claims for a new HCP prescription during a 5-month period before or after the HCP schedule change were analyzed to determine member demographics (age, gender, and number of claims) and claim characteristics (average daily dose, average quantity per claim, and days supply). The rate of HCP claims increased before and decreased after the HCP schedule change. Controlling for the trend during the period before the HCP schedule change, the rate of HCP claims per 1,000 members per month decreased at a greater rate than non-HCP analgesics in the period after the HCP schedule change (P < 0.001). The percentage of HCP claims for new start members decreased after the HCP schedule change (44.9% vs. 34.1% of all HCP claims pre- to post-schedule change; P < 0.001). In the group of new starts, there was not a significant difference in the average daily dose (26.3 mg vs. 26.4 mg; P = 0.69), while there was a decrease in average number of tablets dispensed per claim (from 37.1 to 20.3 tablets; P < 0.001) and an increase in the percentage of claims for a shorter days supply (from 57.7% to 81.6%; P < 0.001). The findings of this study suggest that the HCP schedule change may have contributed to the decrease in claims for HCPs in a Medicaid population. After the HCP schedule change, there was a trend towards decreased HCP use among new starts. No outside funding supported this study. The authors have nothing to disclose. Study concept and design were contributed by all authors except for Arnold and Clements. Tran, Arnold, and Clements took the lead in data collection, along with Peristere, and data interpretation was performed by all the authors, except Arnold. The manuscript was written primarily by Tran, along with Lavitas, Stevens, and Greenwood, and revised by all the authors except Arnold and Peristere. A poster of this research project was presented at the Academy of Managed Care Pharmacy's 2016 Annual Meeting in San Francisco, California, April 2016.

  6. Solving a real-world problem using an evolving heuristically driven schedule builder.

    PubMed

    Hart, E; Ross, P; Nelson, J

    1998-01-01

    This work addresses the real-life scheduling problem of a Scottish company that must produce daily schedules for the catching and transportation of large numbers of live chickens. The problem is complex and highly constrained. We show that it can be successfully solved by division into two subproblems and solving each using a separate genetic algorithm (GA). We address the problem of whether this produces locally optimal solutions and how to overcome this. We extend the traditional approach of evolving a "permutation + schedule builder" by concentrating on evolving the schedule builder itself. This results in a unique schedule builder being built for each daily scheduling problem, each individually tailored to deal with the particular features of that problem. This results in a robust, fast, and flexible system that can cope with most of the circumstances imaginable at the factory. We also compare the performance of a GA approach to several other evolutionary methods and show that population-based methods are superior to both hill-climbing and simulated annealing in the quality of solutions produced. Population-based methods also have the distinct advantage of producing multiple, equally fit solutions, which is of particular importance when considering the practical aspects of the problem.

  7. Instructional versus schedule control of humans' choices in situations of diminishing returns

    PubMed Central

    Hackenberg, Timothy D.; Joker, Veronica R.

    1994-01-01

    Four adult humans chose repeatedly between a fixed-time schedule (of points later exchangeable for money) and a progressive-time schedule that began at 0 s and increased by a fixed number of seconds with each point delivered by that schedule. Each point delivered by the fixed-time schedule reset the requirements of the progressive-time schedule to its minimum value. Subjects were provided with instructions that specified a particular sequence of choices. Under the initial conditions, the instructions accurately specified the optimal choice sequence. Thus, control by instructions and optimal control by the programmed contingencies both supported the same performance. To distinguish the effects of instructions from schedule sensitivity, the correspondence between the instructed and optimal choice patterns was gradually altered across conditions by varying the step size of the progressive-time schedule while maintaining the same instructions. Step size was manipulated, typically in 1-s units, first in an ascending and then in a descending sequence of conditions. Instructions quickly established control in all 4 subjects but, by narrowing the range of choice patterns, they reduced subsequent sensitivity to schedule changes. Instructional control was maintained across the ascending sequence of progressive-time values for each subject, but eventually diminished, giving way to more schedule-appropriate patterns. The transition from instruction-appropriate to schedule-appropriate behavior was characterized by an increase in the variability of choice patterns and local increases in point density. On the descending sequence of progressive-time values, behavior appeared to be schedule sensitive, sometimes even optimally sensitive, but it did not always change systematically with the contingencies, suggesting the involvement of other factors. PMID:16812747

  8. Graduate Medical Education Viewed from the National Intern and Resident Matching Program

    ERIC Educational Resources Information Center

    Graettinger, John S.

    1976-01-01

    The total number of applicants for first-year programs in graduate medical education through the National Intern and Resident Matching Program in 1976 exceeded the number of positions offered for the second consecutive year. There were deficits in the number of openings offered in the primary care specialties and surfeits in medical and surgical…

  9. High on-clopidogrel treatment platelet reactivity in Thai patients with chronic stable angina scheduled for percutaneous coronary intervention.

    PubMed

    Phankingthongkum, Rewat; Panchavinnin, Pradit; Chinthammitr, Yingyong; Tresukosol, Damras; Chotinaiwattarakul, Chunhakasem; Tungsubutra, Wiwun; Wongpraparut, Nattawut; Kitrattana, Bussakorn; Leewanun, Piyachat

    2013-05-01

    To determine the prevalence, clinical profile, and risk factors of high on-clopidogrel treatment platelet reactivity in Thai patients with chronic stable angina scheduled for percutaneous coronary intervention. The patients were prospectively recruited from the consecutive patients undergoing coronary angiography and planned for elective percutaneous coronary intervention (PCI). Ten ml of blood samples were cautiously drawn from the antecubital vein of the patients to determine the hemoglobin and platelet count. Platelet aggregation test was performed by light transmittance aggregometry using platelet-rich plasma. Platelets were stimulated with 5 microM adenosine diphosphate (ADP). Platelet aggregation was expressed as the maximal percent change in light transmittance from baseline. High on-clopidogrel treatment platelet reactivity was defined as post treatment maximal platelet aggregation > 46% with 5 micromol/l ADP used as agonist. The present study consecutively enrolled two hundred four patients diagnosed with chronic stable angina planned for PCI. Seventy-nine patients demonstrated the high on-clopidogrel treatment platelet reactivity (38.7%). Among these patients, 48% were men with a mean age of 66 years. Diabetes mellitus and chronic kidney disease were detected in 34.2%. Original clopidogrel (Plavix) was prescribed in 72% of the patients and 28% received generic clopidogrel (Apolets). The prevalence of high on-clopidogrel treatment platelet reactivity increased in the older patients, patients with CKD and patients receiving angiotensin receptor blockers (ARB). However from multivariate analysis, none of the risk factors, including age, BMl, diabetes mellitus, smoking, CKD, ARB use, and type of clopidogrel (Plavix versus Apolets) had a statistically significant association with the high on-clopidogrel treatment platelet reactivity. The prevalence of high on-clopidogrel treatment platelet reactivity in the present study was 38.7%. No significant association was demonstrated between age, BMI, diabetes mellitus, smoking, CKD, ARB use, type of clopidogrel, and high on-clopidogrel treatment platelet reactivity.

  10. 48 CFR 9904.403-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... personnel, labor hours, payroll, number of hires. 2. Manufacturing policies, (quality control, industrial engineering, production, scheduling, tooling, inspection and testing, etc 2. Manufacturing cost input, manufacturing direct labor. 3. Engineering policies 3. Total engineering costs, engineering direct labor, number...

  11. 48 CFR 9904.403-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... personnel, labor hours, payroll, number of hires. 2. Manufacturing policies, (quality control, industrial engineering, production, scheduling, tooling, inspection and testing, etc 2. Manufacturing cost input, manufacturing direct labor. 3. Engineering policies 3. Total engineering costs, engineering direct labor, number...

  12. 48 CFR 9904.403-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... personnel, labor hours, payroll, number of hires. 2. Manufacturing policies, (quality control, industrial engineering, production, scheduling, tooling, inspection and testing, etc 2. Manufacturing cost input, manufacturing direct labor. 3. Engineering policies 3. Total engineering costs, engineering direct labor, number...

  13. 77 FR 3758 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ...: Attachment H Schedule 7 Compliance Filing to be effective 6/1/2011. Filed Date: 1/13/12. Accession Number... filings: Docket Numbers: QF12-159-000. Applicants: City of Kinston, NC. Description: FERC Form 556 of City...

  14. Differential impact of response effort within a response chain on use of mands in a student with autism.

    PubMed

    Buckley, Scott D; Newchok, Debra K

    2005-01-01

    We investigated the effects of response effort on the use of mands during functional communication training (FCT) in a participant with autism. The number of links in a picture exchange response chain determined two levels of response effort. Each level was paired with a fixed ratio (FR3) schedule of reinforcement for aggression in a reversal design. Responding to either schedule produced access to a preferred item. The participant opted for the low effort mand while aggression decreased significantly. However, the high effort mand did not compete with the FR3 schedule for aggression. Results are discussed in terms of response effort within a response chain of a picture exchange system and competing ratio schedules for problem behavior during mand training.

  15. Open shop scheduling problem to minimize total weighted completion time

    NASA Astrophysics Data System (ADS)

    Bai, Danyu; Zhang, Zhihai; Zhang, Qiang; Tang, Mengqian

    2017-01-01

    A given number of jobs in an open shop scheduling environment must each be processed for given amounts of time on each of a given set of machines in an arbitrary sequence. This study aims to achieve a schedule that minimizes total weighted completion time. Owing to the strong NP-hardness of the problem, the weighted shortest processing time block (WSPTB) heuristic is presented to obtain approximate solutions for large-scale problems. Performance analysis proves the asymptotic optimality of the WSPTB heuristic in the sense of probability limits. The largest weight block rule is provided to seek optimal schedules in polynomial time for a special case. A hybrid discrete differential evolution algorithm is designed to obtain high-quality solutions for moderate-scale problems. Simulation experiments demonstrate the effectiveness of the proposed algorithms.

  16. 21 CFR 1311.35 - Number of CSOS digital certificates needed.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Number of CSOS digital certificates needed. 1311... FOR ELECTRONIC ORDERS AND PRESCRIPTIONS Obtaining and Using Digital Certificates for Electronic Orders § 1311.35 Number of CSOS digital certificates needed. A purchaser of Schedule I and II controlled...

  17. Golden Proportions for the Generalized Tribonacci Numbers

    ERIC Educational Resources Information Center

    Shah, Devbhadra V.; Mehta, Darshana A.

    2009-01-01

    It is known that the ratios of consecutive terms of Fibonacci and Tribonacci sequences converge to the fixed ratio. In this article, we consider the generalized form of Tribonacci numbers and derive the "golden proportion" for the whole family of this generalized sequence. (Contains 2 tables.)

  18. Controlling measles using supplemental immunization activities: A mathematical model to inform optimal policy

    PubMed Central

    Verguet, Stéphane; Johri, Mira; Morris, Shaun K.; Gauvreau, Cindy L.; Jha, Prabhat; Jit, Mark

    2015-01-01

    Background The Measles & Rubella Initiative, a broad consortium of global health agencies, has provided support to measles-burdened countries, focusing on sustaining high coverage of routine immunization of children and supplementing it with a second dose opportunity for measles vaccine through supplemental immunization activities (SIAs). We estimate optimal scheduling of SIAs in countries with the highest measles burden. Methods We develop an age-stratified dynamic compartmental model of measles transmission. We explore the frequency of SIAs in order to achieve measles control in selected countries and two Indian states with high measles burden. Specifically, we compute the maximum allowable time period between two consecutive SIAs to achieve measles control. Results Our analysis indicates that a single SIA will not control measles transmission in any of the countries with high measles burden. However, regular SIAs at high coverage levels are a viable strategy to prevent measles outbreaks. The periodicity of SIAs differs between countries and even within a single country, and is determined by population demographics and existing routine immunization coverage. Conclusions Our analysis can guide country policymakers deciding on the optimal scheduling of SIA campaigns and the best combination of routine and SIA vaccination to control measles. PMID:25541214

  19. The effects of signalled and unsignalled lick-dependent delays on the development of schedule-induced drinking in rats.

    PubMed

    Pellon, R; Blackman, D E

    1991-02-01

    Food pellets were programmed to be delivered to rats every 60 sec (Fixed Time 60-sec schedule), and the development of schedule-induced drinking was measured in terms of the amount of water consumed and the number of licks per inter-pellet interval. For some rats (masters) 10-sec delays in food delivery were dependent on licks. Yoked-control rats received food at the same time as their masters and independently of their own behaviour. In Experiment 1, in which the delays were signalled by a blackout, the master rats began to drink, but this schedule-induced behaviour then decreased to levels lower than those shown by the yoked controls. When the signalled delays were discontinued, the drinking of the master rats recovered. In Experiment 2, in which the delays were not signalled, the master rats did not develop as much schedule-induced drinking as the yoked controls, and discontinuing the delays led to only small increases in drinking. These results support the view that schedule-induced drinking is subject to control by its consequences.

  20. Its Cerenkov Radiation

    DTIC Science & Technology

    1989-12-01

    Report 2b Declassification Downgrading Schedule Approved for public release; distribution is unlimited. 4 Performing Organization Report Number(s) 5...Monitoring Organization Report Number(s) 6a Name of Performing Organization 6b Office Symbol 7a Name of Monitoring Organization Naval Postraduate School (if... Prodcution Ratio. DS vs. MIT........................ 29 Figure 15. Cerenkov Weights at Detector ........... I.................... 30 Figure 16. Ratio at

  1. Cortisol, reaction time test and health among offshore shift workers.

    PubMed

    Harris, Anette; Waage, Siri; Ursin, Holger; Hansen, Ase Marie; Bjorvatn, Bjørn; Eriksen, Hege R

    2010-10-01

    The stress hormone cortisol shows a pronounced endogenous diurnal rhythm, which is affected by the sleep/wake cycle, meals and activity. Shift work and especially night work disrupts the sleep/wake cycle and causes a desynchronization of the natural biological rhythms. Therefore, different shift schedules may have different impact on performance at work and health. The purpose was to study if health, reaction time, and the cortisol rhythm were negatively affected when a group of shift workers changed their work schedule from ordinary day-night shift (fixed shift) to "swing shift". 19 healthy workers on a Norwegian oil rig participated in the study. They worked 2 weeks offshore followed by 4 weeks off work. The ordinary schedule consisted of 12-h day shift and 12-h night shift every other work period (14 days or nights=fixed shift). "Swing shift" involved 1 week of night shift, followed by 1 week of day shift during the work period. All participants worked ordinary day-night shift when baseline data were collected (questionnaires, saliva cortisol, and reaction time during work). After collection of baseline data the workers changed their work schedule to "swing shift", for every working period, and 9 months later the same data were collected. "Swing shift" did not give any negative health effects or any negative changes in reaction time during the day they shifted from night work to day work. Personnel adapted to night shift within a week regardless of schedule, but recovery from night shift took longer time. During swing shift the cortisol rhythm went back towards a normal rhythm in the second week, but it was not returned completely to normal values when they returned home for the 4 weeks off period. However, the cortisol rhythms were readapted to normal values after 1 week at home. For personnel returning home directly from 14 consecutive night shifts, cortisol adaptation was not complete after 1 week at home. We found no increase in health complaints from swing shift or reaction time in the shift from night to day work. Recovery from night shift takes longer time. Copyright © 2010 Elsevier Ltd. All rights reserved.

  2. A preliminary randomized controlled trial of contingency management for alcohol use reduction using a transdermal alcohol sensor.

    PubMed

    Barnett, Nancy P; Celio, Mark A; Tidey, Jennifer W; Murphy, James G; Colby, Suzanne M; Swift, Robert M

    2017-06-01

    We tested the efficacy of daily contingent reinforcement for reducing alcohol use compared with (yoked) non-contingent reinforcement (NR) using a transdermal alcohol sensor to detect alcohol use. Pilot randomized controlled design with 1 baseline week, 3 intervention weeks and 1-month follow-up. New England, USA. Heavy drinking adults (46.7% female) not seeking treatment were randomized to (1) an escalating schedule of cash reinforcement (CR; n = 15) for days on which alcohol was neither reported nor detected or (2) yoked NR (n = 15). Reinforcement for CR participants started at $5 and increased $2 every subsequent day on which alcohol was not detected or reported, to a maximum of $17. Participants received no reinforcement for days on which alcohol use was detected or reported, and the reinforcer value was re-set to $5 the day after a drinking day. NR participants were yoked to the daily reinforcer value of an individual in the CR condition, in order of enrollment. Paired participants in CR and NR therefore received the same amount of money, but the amount for the NR participant was not behavior-related. The primary outcome was percentage of days without sensor-detected drinking. Secondary outcomes were number of consecutive days with no detected drinking, peak transdermal alcohol concentration (TAC), self-reported drinks per week and drinking below NIH low-risk guidelines. Controlling for baseline, CR had a higher percentage of days with no drinking detected (54.3%) than NR (31.2%) during intervention weeks [P = 0.05, Cohen's d = 0.74; 95% confidence interval (CI) = 0.007-1.47]. The longest period of consecutive days with no drinking detected was 8.0 for CR versus 2.9 for NR (P = 0.03, d = 0.85; 95% CI = 0.08-1.61). Peak TAC during intervention showed a non-significant group difference (P = 0.20; d = 0.48; 95% CI = 0.00-1.18); a similar result was found for drinks per week (P = 0.12; d = 0.59; 95% CI = 0.00-1.30). Four times more participants in CR drank below NIH low-risk drinking guidelines during intervention than did participants in NR: 31.1 versus 7.1% (P = 0.07; d = 0.71; 95% CI = -0.04 to 1.46). At 1-month follow-up, the highest number of consecutive days without drinking (self-report) did not differ significantly between conditions (P = 0.26), but showed a medium effect size (d = 0.44; 95% CI = -0.32 to 1.18). Cash incentives linked to a transdermal alcohol sensor can reduce heavy alcohol consumption while the incentives are in operation. © 2017 Society for the Study of Addiction.

  3. Tank Riser Pit Decontamination System (Pit Viper) Return on Investment and Break-Even Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Joan K.; Weimar, Mark R.; Balducci, Patrick J.

    2003-06-30

    This study assessed the cost benefit of Pit Viper deployment for 80 tank farm pits between October 1, 2003 and September 30, 2012 under the technical baseline for applicable double-shell tank (DST) and single-shell tank (SST) projects. After this assessment had been completed, the U.S. Department of Energy (DOE) Richland Operations Office (RL) and Office of River Protection (ORP) published the Hanford Performance Management Plan (August 2003), which accelerated the schedule for SST retrieval. Then, DOE/CH2M HILL contract modification M064 (October 2002) and The Integrated Mission Acceleration Plan (March 2003) further accelerated SST retrieval and closure schedules. Twenty-six to 40more » tanks must be retrieved by 2006. Thus the schedule for SST pit entries is accelerated and the number of SST pit entries is increased. This study estimates the return on investment (ROI) and the number of pits where Pit Viper deployment would break even or save money over current manual practices. The results of the analysis indicate a positive return on the federal investment for deployment of the Pit Viper provided it is used on a sufficient number of pits.« less

  4. Marathon works

    PubMed Central

    Orrantia, Eliseo

    2005-01-01

    PROBLEM BEING ADDRESSED Medical care in rural Canada has long been hampered by insufficient numbers of physicians. How can a rural community’s physicians change the local medical culture and create a new approach to sustaining their practice? OBJECTIVE OF PROGRAM To create a sustainable, collegial family practice group and address one rural community’s chronically underserviced health care needs. PROGRAM DESCRIPTION Elements important to physicians’ well-being were incorporated into the health care group’s functioning to enhance retention and recruitment. The intentional development of a consensus-based approach to decision making has created a supportive team of physicians. Ongoing communication is kept up through regular meetings, retreats, and a Web-based discussion board. Individual physicians retain control of their hours worked each year and their schedules. A novel obstetric call system was introduced to help make schedules more predictable. An internal governance agreement on an alternative payment plan supports varied work schedules, recognizes and funds non-clinical medical work, and pays group members for undertaking health-related projects. CONCLUSION This approach has helped maintain a stable number of physicians in Marathon, Ont, and has increased the number of health care services delivered to the community. PMID:16190174

  5. Predicting appointment breaking.

    PubMed

    Bean, A G; Talaga, J

    1995-01-01

    The goal of physician referral services is to schedule appointments, but if too many patients fail to show up, the value of the service will be compromised. The authors found that appointment breaking can be predicted by the number of days to the scheduled appointment, the doctor's specialty, and the patient's age and gender. They also offer specific suggestions for modifying the marketing mix to reduce the incidence of no-shows.

  6. Synchronization of Concurrent Processes

    DTIC Science & Technology

    1975-07-01

    Pettersen Stanford Ur.iversity Artificial Intelligence Laboratory ABSTRACT Th oaoer gives an overview of commonly used synchronization primitives and...wr.ters . ut.l.z.ng the DroDo4d synchronization primitive . The solution is simpler and shorter than other known S’ms The first sections of the paper...un reicr»» side il nrcttaary and Identity by block number) Scheduling, process scheduling, synchronization , mutual exclusion, semaphores , critical

  7. A PILOT STUDY COMPARING THE BLOCK SYSTEM AND THE INTERMITTENT SYSTEM OF SCHEDULING SPEECH CORRECTION CASES IN THE PUBLIC SCHOOLS.

    ERIC Educational Resources Information Center

    WEAVER, JOHN B.; WOLLERSHEIM, JANET P.

    TO DETERMINE THE MOST EFFICIENT USES OF THE PUBLIC SCHOOL SPEECH CORRECTIONIST'S SKILLS AND TIME, A STUDY WAS UNDERTAKEN TO INVESTIGATE THE EFFECTIVENESS OF THE INTERMITTENT SYSTEM AND THE BLOCK SYSTEM OF SCHEDULING SPEECH CASES. WITH THE INTERMITTENT SYSTEM THE CORRECTIONIST IS ASSIGNED TO A NUMBER OF SCHOOLS AND GENERALLY SEES CHILDREN TWICE A…

  8. Software For Integer Programming

    NASA Technical Reports Server (NTRS)

    Fogle, F. R.

    1992-01-01

    Improved Exploratory Search Technique for Pure Integer Linear Programming Problems (IESIP) program optimizes objective function of variables subject to confining functions or constraints, using discrete optimization or integer programming. Enables rapid solution of problems up to 10 variables in size. Integer programming required for accuracy in modeling systems containing small number of components, distribution of goods, scheduling operations on machine tools, and scheduling production in general. Written in Borland's TURBO Pascal.

  9. Optimal Day-Ahead Scheduling of a Hybrid Electric Grid Using Weather Forecasts

    DTIC Science & Technology

    2013-12-01

    ahead scheduling, Weather forecast , Wind power , Photovoltaic Power 15. NUMBER OF PAGES 107 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...cost can be reached by accurately anticipating the future renewable power productions. This thesis suggests the use of weather forecasts to establish...reached by accurately anticipating the future renewable power productions. This thesis suggests the use of weather forecasts to establish day-ahead

  10. A Study on the Implementation of the Ecotran Systems, Inc. Computerized Routing and Scheduling Pupil Transportation System. San Diego Unified School District, Superintendent's Organizational Study Team.

    ERIC Educational Resources Information Center

    Carriedo, Ruben; And Others

    The San Diego Unified School District (California) began operating a computerized routing and scheduling system for its pupil transportation services at the beginning of the 1985-86 academic school year. The computerized system, provided by Ecotran Systems, Inc. (ECO) of Cleveland, Ohio experienced an inordinate number of difficulties. A…

  11. Consecutive unsplinted implant-supported restorations to replace lost multiple adjacent posterior teeth: A 4-year prospective cohort study.

    PubMed

    Lee, Jung-Tae; Lee, Hyo-Jung; Park, Shin-Young; Kim, Hae-Young; Yeo, In-Sung

    2015-08-01

    The aim of this study was to investigate the various events occurring in unsplinted implant restoration in posterior jaws during a period of 4 years. From August 2008 to April 2009, eight volunteers (three men and five women) who had two or more consecutively missing teeth received 20 implants in posterior maxillae and mandibles. Unsplinted single crowns were delivered to each implant. For the 4-year follow-up periods, patients were enrolled in a maintenance schedule at 1, 3, 6, 12, 24, 36 and 48 months. The data, including a questionnaire, radiography, mobility and probing were recorded on regular check-ups. A total of 20 implants in eight patients were followed up for 48 months, showing a 100% survival rate. Mean marginal bone loss around implants was 0.26 mm. Statistical analysis revealed insignificant correlation between metal-ceramic and zirconia-ceramic crowns and among implant lengths (8.5 mm, 10 mm and 11.5 mm). Mean probing depths were similar or insignificantly different, regardless of the materials used or length of implants. The most frequent complications, in decreasing order, were food impaction (65%) and porcelain chipping (45%), sensitivity (25%), pain (20%) and loose contact (15%). Compared with metal-ceramic crowns, zirconia-ceramic crowns showed more unfavorable cases of porcelain chipping (p=0.017), pain (p=0.007) and loose contact with an adjacent crown (p=0.031). Within the limits of the sample size, this study showed that unsplinted implant-supported single restorations to replace consecutive posterior missing teeth may function well.

  12. Sensor-scheduling simulation of disparate sensors for Space Situational Awareness

    NASA Astrophysics Data System (ADS)

    Hobson, T.; Clarkson, I.

    2011-09-01

    The art and science of space situational awareness (SSA) has been practised and developed from the time of Sputnik. However, recent developments, such as the accelerating pace of satellite launch, the proliferation of launch capable agencies, both commercial and sovereign, and recent well-publicised collisions involving man-made space objects, has further magnified the importance of timely and accurate SSA. The United States Strategic Command (USSTRATCOM) operates the Space Surveillance Network (SSN), a global network of sensors tasked with maintaining SSA. The rapidly increasing number of resident space objects will require commensurate improvements in the SSN. Sensors are scarce resources that must be scheduled judiciously to obtain measurements of maximum utility. Improvements in sensor scheduling and fusion, can serve to reduce the number of additional sensors that may be required. Recently, Hill et al. [1] have proposed and developed a simulation environment named TASMAN (Tasking Autonomous Sensors in a Multiple Application Network) to enable testing of alternative scheduling strategies within a simulated multi-sensor, multi-target environment. TASMAN simulates a high-fidelity, hardware-in-the-loop system by running multiple machines with different roles in parallel. At present, TASMAN is limited to simulations involving electro-optic sensors. Its high fidelity is at once a feature and a limitation, since supercomputing is required to run simulations of appreciable scale. In this paper, we describe an alternative, modular and scalable SSA simulation system that can extend the work of Hill et al with reduced complexity, albeit also with reduced fidelity. The tool has been developed in MATLAB and therefore can be run on a very wide range of computing platforms. It can also make use of MATLAB’s parallel processing capabilities to obtain considerable speed-up. The speed and flexibility so obtained can be used to quickly test scheduling algorithms even with a relatively large number of space objects. We further describe an application of the tool by exploring how the relative mixture of electro-optical and radar sensors can impact the scheduling, fusion and achievable accuracy of an SSA system. By varying the mixture of sensor types, we are able to characterise the main advantages and disadvantages of each configuration.

  13. Decreasing inventory of a cement factory roller mill parts using reliability centered maintenance method

    NASA Astrophysics Data System (ADS)

    Witantyo; Rindiyah, Anita

    2018-03-01

    According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.

  14. An investigation of low ergonomics risk awareness, among staffs at early product development phase in Malaysia automotive industries

    NASA Astrophysics Data System (ADS)

    Aziz, Fazilah Abdul; Razali, Noraini; Najmiyah Jaafar, Nur

    2016-02-01

    Currently there are many automotive companies still unable to effectively prevent consequences of poor ergonomics in their manufacturing processes. This study purpose is to determine the surrounding factors that influence low ergonomics risk awareness among staffs at early product development phase in Malaysia automotive industry. In this study there are four variables, low ergonomic risk awareness, inappropriate method and tools, tight development schedule and lack of management support. The survey data were gathered from 245 respondents of local automotive companies in Malaysia. The data was analysed through multiple regression and moderated regression using the IBM SPSS software. Study results revealed that low ergonomic risk awareness has influenced by inappropriate method and tool, and tight development schedule. There were positive linear relationships between low ergonomic risk awareness and inappropriate method and tools, and tight development schedule. The more inappropriate method and tools applied; the lower their ergonomic risk awareness. The more tight development schedule is the lower ergonomic risk awareness. The relationship between low ergonomic risk awareness and inappropriate method and tools depends on staff's age, and education level. Furthermore the relationship between low ergonomic risk awareness and tight development schedule depends on staff's working experience and number of project involvement. The main contribution of this paper was identified the number of factors of low ergonomics risk awareness and offers better understanding on ergonomics among researchers and automotive manufacturer's employees during product development process.

  15. Comparison of single and consecutive dual frequency induction surface hardening of gear wheels

    NASA Astrophysics Data System (ADS)

    Barglik, J.; Ducki, K.; Kukla, D.; Mizera, J.; Mrówka-Nowotnik, G.; Sieniawski, J.; Smalcerz, A.

    2018-05-01

    Mathematical modelling of single and consecutive dual - frequency induction surface hardening systems are presented and compared. The both models are solved by the 3D FEM-based professional software supported by a number of own numerical procedures. The methodology is illustrated with some examples of surface induction hardening of a gear wheel made of steel 41Cr4. The computations are in a good accordance with experiments provided on the laboratory stand.

  16. Microwave Processing of Polymeric Materials

    DTIC Science & Technology

    1992-04-01

    DECLASSIFICATION/DOWNGRADING SCHEDULE Approved for public release; distribution is unlimited 4 . PERFORMING ORGANIZATION REPORT NUMBER(S) 5. MONITORING ORGANIZATION... 4 2.1.1. Microwave Processing ................................................................. 4 2.1.1.1. Epoxy Resin Networks... 4 2.1.1.2. Epoxy Resin Composites

  17. 76 FR 1606 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Number (SSN), rank, gender, birth date, medical appointment scheduling information, employment... manage the entire learning environment for all soldiers. Training managers at separate companies..., unit number, rank, military occupational specialty, skill level, and signature. In addition, the...

  18. Observed behaviours of pre-term children in a social play situation with classroom peers.

    PubMed

    Nadeau, Line; Tessier, Réjean; Descôteaux, Amélie

    2009-08-01

    A number of studies have reported social adjustment problems in pre-term children. To observe the pre-term's behaviour in an experimental situation and correlate these observed behaviours with the children's peer-rated social behaviours (withdrawal, aggression and sociability/leadership). Of 56 pre-term children, 24 were classified as the sick pre-term (SPT) group and 32 children as the healthy pre-term (HPT) group. The comparison group comprised 56 healthy full-terms. The experimental situation used a game called Rush Hour, a labyrinth-type board game. The play situation was videotaped and behaviours (number of consecutive moves) were coded in real time. At 12 years of age, the sick pre-term (SPT) group exhibited fewer consecutive moves during the game than the other two groups, especially when the task became more complex (involving four consecutives moves). Moreover, the Complex Task Index was correlated with the social withdrawal score rated by peers. The at-birth sick pre-term gradually became less involved in a complex decision-making task and this was understood as a lesser ability to make a decision in a complex setting.

  19. Critical role of bevacizumab scheduling in combination with pre-surgical chemo-radiotherapy in MRI-defined high-risk locally advanced rectal cancer: Results of the BRANCH trial.

    PubMed

    Avallone, Antonio; Pecori, Biagio; Bianco, Franco; Aloj, Luigi; Tatangelo, Fabiana; Romano, Carmela; Granata, Vincenza; Marone, Pietro; Leone, Alessandra; Botti, Gerardo; Petrillo, Antonella; Caracò, Corradina; Iaffaioli, Vincenzo R; Muto, Paolo; Romano, Giovanni; Comella, Pasquale; Budillon, Alfredo; Delrio, Paolo

    2015-10-06

    We have previously shown that an intensified preoperative regimen including oxaliplatin plus raltitrexed and 5-fluorouracil/folinic acid (OXATOM/FUFA) during preoperative pelvic radiotherapy produced promising results in locally advanced rectal cancer (LARC). Preclinical evidence suggests that the scheduling of bevacizumab may be crucial to optimize its combination with chemo-radiotherapy. This non-randomized, non-comparative, phase II study was conducted in MRI-defined high-risk LARC. Patients received three biweekly cycles of OXATOM/FUFA during RT. Bevacizumab was given 2 weeks before the start of chemo-radiotherapy, and on the same day of chemotherapy for 3 cycles (concomitant-schedule A) or 4 days prior to the first and second cycle of chemotherapy (sequential-schedule B). Primary end point was pathological complete tumor regression (TRG1) rate. The accrual for the concomitant-schedule was early terminated because the number of TRG1 (2 out of 16 patients) was statistically inconsistent with the hypothesis of activity (30%) to be tested. Conversely, the endpoint was reached with the sequential-schedule and the final TRG1 rate among 46 enrolled patients was 50% (95% CI 35%-65%). Neutropenia was the most common grade ≥ 3 toxicity with both schedules, but it was less pronounced with the sequential than concomitant-schedule (30% vs. 44%). Postoperative complications occurred in 8/15 (53%) and 13/46 (28%) patients in schedule A and B, respectively. At 5 year follow-up the probability of PFS and OS was 80% (95%CI, 66%-89%) and 85% (95%CI, 69%-93%), respectively, for the sequential-schedule. These results highlights the relevance of bevacizumab scheduling to optimize its combination with preoperative chemo-radiotherapy in the management of LARC.

  20. Scheduling Capacitated One-Way Vehicles on Paths with Deadlines

    NASA Astrophysics Data System (ADS)

    Uchida, Jun; Karuno, Yoshiyuki; Nagamochi, Hiroshi

    In this paper, we deal with a scheduling problem of minimizing the number of employed vehicles on paths. Let G=(V,E) be a path with a set V={vi|i=1,2,...,n} of vertices and a set E={{vi,vi+1}|i=1,2,...,n-1} of edges. Vehicles with capacity b are initially situated at v1. There is a job i at each vertex vi∈V, which has its own handling time hi and deadline di. With each edge {vi,vi+1}∈E, a travel time wi,i+1 is associated. Each job is processed by exactly one vehicle, and the number of jobs processed by a vehicle does not exceed the capacity b. A routing of a vehicle is called one-way if the vehicle visits every edge {vi,vi+1} exactly once (i.e., it simply moves from v1 to vn on G). Any vehicle is assumed to follow the one-way routing constraint. The problem asks to find a schedule that minimizes the number of one-way vehicles, meeting the deadline and capacity constraints. A greedy heuristic is proposed, which repeats a dynamic programming procedure for a single one-way vehicle problem of maximizing the number of non-tardy jobs. We show that the greedy heuristic runs in O(n3) time, and the approximation ratio is at most ln b+1.

  1. The Magic Number 70 (Plus or Minus 20): Variables Determining Performance in the Rodent Odor Span Task

    ERIC Educational Resources Information Center

    April, L. Brooke; Bruce, Katherine; Galizio, Mark

    2013-01-01

    The olfactory span task (OST) uses an incrementing non-matching to sample procedure such that the number of stimuli to remember increases during the session. The number of consecutive correct responses (span length) and percent correct as a function of the memory load have been viewed as defining rodent working memory capacity limitations in…

  2. Child Abuse and Neglect. Data Snapshot

    ERIC Educational Resources Information Center

    DC Action for Children, 2011

    2011-01-01

    The number of substantiated cases of child abuse and neglect in the District rose by 27 percent in FY 2009. This dramatic spike came after two consecutive years of decline in the number of substantiated cases reported the D.C. Child and Family Services Agency (CFSA). In FY 2010, the number of closed, substantiated cases dropped back down to 1,691,…

  3. Job-sharing in nuclear medicine: an 8-year experience (1998-2006).

    PubMed

    Als, Claudine; Brautigam, Peter

    2006-01-01

    Job-sharing is generally defined as a situation in which a single professional position is held in common by two separate individuals, who alternatively, on a timely basis, deal with the workload and the responsibilities. The aim of the present paper is to discuss prerequisites and characteristics of job-sharing by medical doctors and implications in a department of nuclear medicine. Job-sharing facilitates the combination of family life with professional occupation and prevents burnout. The time schedule applied by job-sharers is relevant: will both partners work for half-days, half-weeks, or rather alternatively during one to two consecutive weeks? This crucial choice, depending on personal as well as on professional circumstances, certainly influences the workflow of the department.

  4. 78 FR 7443 - Request for Comment on the Redesign of the American Housing Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... must be scheduled by calling 202-402-5538 (this is not a toll-free number). Individuals with speech or hearing impairments may access this number via TTY by calling the toll-free Federal Relay Service at 800...-0500, telephone number 202-402-5538 (this is not a toll-free number). Hearing or speech-impaired...

  5. 10 CFR 73.72 - Requirement for advance notice of shipment of formula quantities of strategic special nuclear...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... at the phone numbers listed in appendix A to this part. Classified and safeguards notifications shall... shall be notified by telephone of schedule changes of more than 6 hours at the phone numbers listed in...(s), address(es), and telephone number(s) of the shipper, receiver, and carrier(s); (ii) A physical...

  6. Acquisition of shape information in working memory, as a function of viewing time and number of consecutive images: evidence for a succession of discrete storage classes.

    PubMed

    Ninio, J

    1998-07-01

    The capacity of visual working memory was investigated using abstract images that were slightly distorted NxN (with generally N=8) square lattices of black or white randomly selected elements. After viewing an image, or a sequence of images, the subjects viewed couples of images containing the test image and a distractor image derived from the first one by changing the black or white value of q randomly selected elements. The number q was adjusted in each experiment to the difficulty of the task and the abilities of the subject. The fraction of recognition errors, given q and N was used to evaluate the number M of bits memorized by the subject. For untrained subjects, this number M varied in a biphasic manner as a function of the time t of presentation of the test image: it was on average 13 bits for 1 s, 16 bits for 2 to 5 s, and 20 bits for 8 s. The slow pace of acquisition, from 1 to 8 s, seems due to encoding difficulties, and not to channel capacity limitations. Beyond 8 s, M(t), accurately determined for one subject, followed a square root law, in agreement with 19th century observations on the memorization of lists of digits. When two consecutive 8x8 images were viewed and tested in the same order, the number of memorized bits was downshifted by a nearly constant amount, independent of t, and equal on average to 6-7 bits. Across the subjects, the shift was independent of M. When two consecutive test images were related, the recognition errors decreased for both images, whether the testing was performed in the presentation or the reverse order. Studies involving three subjects, indicate that, when viewing m consecutive images, the average amount of information captured per image varies with m in a stepwise fashion. The first two step boundaries were around m=3 and m=9-12. The data are compatible with a model of organization of working memory in several successive layers containing increasing numbers of units, the more remote a unit, the lower the rate at which it may acquire encoded information. Copyright 1998 Elsevier Science B.V.

  7. A phase I and pharmacologic study of sequences of the proteasome inhibitor, bortezomib (PS-341, Velcade), in combination with paclitaxel and carboplatin in patients with advanced malignancies.

    PubMed

    Ma, Cynthia; Mandrekar, Sumithra J; Alberts, Steven R; Croghan, Gary A; Jatoi, Aminah; Reid, Joel M; Hanson, Lorelei J; Bruzek, Laura; Tan, Angelina D; Pitot, Henry C; Erlichman, Charles; Wright, John J; Adjei, Alex A

    2007-02-01

    Bortezomib, a selective inhibitor of the 20S proteasome with activity in a variety of cancers, exhibits sequence-dependent synergistic cytotoxicity with taxanes and platinum agents. Two different treatment schedules of bortezomib in combination with paclitaxel and carboplatin were tested in this phase I study to evaluate the effects of scheduling on toxicities, pharmacodynamics and clinical activity. Patients with advanced malignancies were alternately assigned to receive (schedule A) paclitaxel and carboplatin (IV d1) followed by bortezomib (IV d2, d5, d8) or (schedule B) bortezomib (IV d1, d4, d8) followed by paclitaxel and carboplatin (IV d2) on a 21-day cycle. Fifty-three patients (A 25, B 28) were treated with a median of 3 cycles (range 1-8) for schedule A and 3.5 cycles (range 1-10) for schedule B. Grade 3 or higher treatment related hematologic adverse events in all cycles of treatment included neutropenia (A 52%, B 50%), anemia (A 12%, B 7.1%) and thrombocytopenia (A 16%, B 17.9%). Non-hematologic treatment related adverse events were fairly mild (primarily grades 1 and 2). The maximum tolerated dose and the recommended doses for future phase II trials are bortezomib 1.2 mg/m2, paclitaxel 135 mg/m2 and carboplatin AUC = 6 for schedule A and bortezomib 1.2 mg/m2, paclitaxel 175 mg/m2 and carboplatin AUC = 6 for schedule B. Six (21.4%) partial responses (PR) were seen with schedule B. In contrast, only 1 (4%) PR was achieved with schedule A. Similar proteasome inhibition was achieved at MTD for both schedules. Administration of sequential bortezomib followed by chemotherapy (schedule B) was well tolerated and associated with an encouraging number of objective responses in this small group of patients. Further studies with this administration schedule are warranted.

  8. Caphosol(®) mouthwash gives no additional protection against oral mucositis compared to cryotherapy alone in stem cell transplantation. A pilot study.

    PubMed

    Svanberg, Anncarin; Öhrn, Kerstin; Birgegård, Gunnar

    2015-02-01

    To investigate if adding Caphosol(®), a mouthwash solution, to oral cryotherapy (OC) further protects against oral mucositis (OM), a toxic painful complication to high dose chemotherapy. The study was a randomised, controlled, study design. Patients ≥16 years scheduled for allogeneic stem cell transplantation were included consecutively and randomised to experimental group receiving OC combined with Caphosol(®) (n = 20) or control group receiving OC only (n = 20). OC was given from start to end of HDCT. Caphosol(®), from day 0 to day 21. There were no significant differences regarding age or gender between the groups. Mucositis was assessed with the World Health Organisation (WHO) grading scale. Pain was assessed with a 10 cm visual analogue scale (VAS) from 0 = no pain to 10 = worst imaginable pain. Start and duration of therapy with pain relieving drugs, serum C-reactive protein values, and number of days of hospitalisation were collected from the medical records. Data on OM, oral pain, use of i.v. opioids and total parenteral nutrition were collected during 22 days. There was no significant difference between the groups on OM, oral pain, use of i.v. opioids or TPN between the groups. The study showed no additional effect of combining Caphosol(®) with OC. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Substance use disorders among mentally ill patients in a General Hospital in Sri Lanka: prevalence and correlates.

    PubMed

    Hapangama, A; Kuruppuarachchi, K A L A; Pathmeswaran, A

    2013-09-01

    To determine the prevalence, and demographic and clinical correlates of substance use disorders among the mentally ill. Cross sectional analytical study. Data were collected from consecutive patients treated at a Tertiary care Psychiatry Unit, Western Province, Sri Lanka using an interview schedule administered by a senior registrar in psychiatry. Diagnosis was based on ICD 10 criteria and the Clinician Rating Scale: Alcohol Use Scale (AUS) and the Drug Use Scale (DUS). The data were analysed using SPSS and WinPepi software programmes, utilising the chi squared, t test and median test. Among a sample of 325 patients, 66% were male; 33% were diagnosed with depressive disorder, 30% with schizophrenia, 23% with bipolar affective disorder and 13% with other disorders. Prevalence of comorbid substance use disorders was 43% (95% CI 38 - 49%). Alcohol was the commonest type of substance used. Those who had a comorbid substance use diagnosis were more likely to be male, have a lower educational level, be unemployed and have a poorer level of social support. They were also found to have poorer treatment adherence, increased number of hospital admissions and an increased association with episodes of violence. A significant proportion of patients were found to have a comorbid substance use diagnosis and associated complications. These findings have important implications for service provision for mentally ill patients with a comorbid substance use disorder.

  10. Clinical assessment of dietary interventions and lifestyle modifications in Madhumeha (type- 2 Diabetes Mellitus)

    PubMed Central

    Gupta, Archana; Agarwal, Neeraj Kumar; Byadgi, Parameswarappa S.

    2014-01-01

    Background: India leads the world with maximum number of diabetes patients being termed as the “diabetes capital of the world.” Certain risk factors including unsatisfactory diet, overweight, and a sedentary lifestyle are potentially reversible. Acharayas have widely described the role of diet and activities to control Madhumeha (type 2 diabetes mellitus [T2DM]) along with medications. Habitual consumption of roasted or dry Barley (Hordeum vulgare L.) flour, Mudga (Phaseolus aureus Roxb.) and Amalaki (Emblica officinalis Gaertn.) prevents the manifestation of Prameha. Aim: To assess the clinical effects of dietary interventions and life style modifications in Madhumeha patients. Materials and Methods: Present study was carried out on 56 patients of Madhumeha from S.S. Hospital, Banaras Hindu University, Varanasi. Dietary interventions and life style modifications schedule was prepared based on Ayurvedic principles and patients were advised to follow this regimen. Three consecutive follow-ups were done for 3 months at the interval of one month each. Results: Significant improvement was observed in clinical signs and symptoms along with plasma glucose and glycosylated hemoglobin (HbA1c) in Madhumeha patients after these interventions (P < 0.001). Conclusion: Dietary interventions and life style modifications are two important tools by which adequate glycemic control can be obtained, especially in newly diagnosed T2DM patients and in patients who are on antidiabetic medication, but not properly controlled. PMID:26195901

  11. School Board Elections: A Study of Citizen Voting Patterns.

    ERIC Educational Resources Information Center

    Townley, Arthur J.; And Others

    1994-01-01

    Compares voter turnout in California school board elections when elections were scheduled in even-numbered years rather than odd-numbered years. Findings from selected school districts since 1985 show significant differences in voter turnout depending on the year: 43.85% voter turnout occurred in even-numbered years compared to 20.79% in odd. (GLR)

  12. 77 FR 65898 - Agency Information Collection Activities: InfoPass System, No Form Number; Extension, Without...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ...-0113] Agency Information Collection Activities: InfoPass System, No Form Number; Extension, Without...) Title of the Form/Collection: InfoPass System. (3) Agency form number, if any, and the applicable... InfoPass system allows an applicant or petitioner to schedule an interview appointment with USCIS...

  13. 21 CFR 1311.35 - Number of CSOS digital certificates needed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Number of CSOS digital certificates needed. 1311... FOR ELECTRONIC ORDERS AND PRESCRIPTIONS (Eff. 6-1-10) Obtaining and Using Digital Certificates for Electronic Orders § 1311.35 Number of CSOS digital certificates needed. A purchaser of Schedule I and II...

  14. 26 CFR 41.6001-2 - Proof of payment for State registration purposes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... section, the vehicle identification number of the vehicle being registered must appear on the Schedule 1... of the vehicles (or their vehicle identification numbers) is not required as part of such proof of... not include a list of vehicle identification numbers is submitted as proof of payment for the...

  15. 26 CFR 41.6001-2 - Proof of payment for State registration purposes.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... section, the vehicle identification number of the vehicle being registered must appear on the Schedule 1... of the vehicles (or their vehicle identification numbers) is not required as part of such proof of... not include a list of vehicle identification numbers is submitted as proof of payment for the...

  16. 36 CFR 1225.26 - How do agencies change a disposition authority?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301) 837-1738. NARA approval is... following, if applicable: (1) The SF 115 and item numbers to be superseded; (2) The General Records Schedules and item numbers that cover the records, if any; and (3) The current published records disposition...

  17. 36 CFR § 1225.26 - How do agencies change a disposition authority?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301) 837-1738. NARA approval is... following, if applicable: (1) The SF 115 and item numbers to be superseded; (2) The General Records Schedules and item numbers that cover the records, if any; and (3) The current published records disposition...

  18. 36 CFR 1225.26 - How do agencies change a disposition authority?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301) 837-1738. NARA approval is... following, if applicable: (1) The SF 115 and item numbers to be superseded; (2) The General Records Schedules and item numbers that cover the records, if any; and (3) The current published records disposition...

  19. 36 CFR 1225.26 - How do agencies change a disposition authority?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301) 837-1738. NARA approval is... following, if applicable: (1) The SF 115 and item numbers to be superseded; (2) The General Records Schedules and item numbers that cover the records, if any; and (3) The current published records disposition...

  20. 75 FR 39682 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Part 63, Subpart VVVV) (Renewal), EPA ICR Number 1966.04, OMB Control Number 2060-0546 AGENCY... 2060-0546. ICR Status: This ICR is schedule to expire on September 30, 2010. Under OMB regulations, the...

  1. ASPESA Papers, Number 9 (November 1990) and Number 10 (June 1991).

    ERIC Educational Resources Information Center

    Hardie, John, Ed.

    1991-01-01

    This document consists of two consecutive issues of "ASPESA Papers", containing 5 and 6 papers, respectively, as follows: (1) "Human Realities and Technology in Distance Learning" (John G. Hedberg and Suzanne McNamara); (2) "A National Distance Education Admissions System," (Gavin Moodie); (3) "What's in a…

  2. Active Solution Space and Search on Job-shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Watanabe, Masato; Ida, Kenichi; Gen, Mitsuo

    In this paper we propose a new searching method of Genetic Algorithm for Job-shop scheduling problem (JSP). The coding method that represent job number in order to decide a priority to arrange a job to Gannt Chart (called the ordinal representation with a priority) in JSP, an active schedule is created by using left shift. We define an active solution at first. It is solution which can create an active schedule without using left shift, and set of its defined an active solution space. Next, we propose an algorithm named Genetic Algorithm with active solution space search (GA-asol) which can create an active solution while solution is evaluated, in order to search the active solution space effectively. We applied it for some benchmark problems to compare with other method. The experimental results show good performance.

  3. Optimization of scheduling system for plant watering using electric cars in agro techno park

    NASA Astrophysics Data System (ADS)

    Oktavia Adiwijaya, Nelly; Herlambang, Yudha; Slamin

    2018-04-01

    Agro Techno Park in University of Jember is a special area used for the development of agriculture, livestock and fishery. In this plantation, the process of watering the plants is according to the frequency of each plant needs. This research develops the optimization of plant watering scheduling system using edge coloring of graph. This research was conducted in 3 stages, namely, data collection phase, analysis phase, and system development stage. The collected data was analyzed and then converted into a graph by using bipartite adjacency matrix representation. The development phase is conducted to build a web-based watering schedule optimization system. The result of this research showed that the schedule system is optimal because it can maximize the use of all electric cars to water the plants and minimize the number of idle cars.

  4. Change from an 8-hour shift to a 12-hour shift, attitudes, sleep, sleepiness and performance.

    PubMed

    Lowden, A; Kecklund, G; Axelsson, J; Akerstedt, T

    1998-01-01

    The present study sought to evaluate the effect of a change from a rotating 3-shift (8-hour) to a 2-shift shift (12 hour) schedule on sleep, sleepiness, performance, perceived health, and well-being. Thirty-two shift workers at a chemical plant (control room operators) responded to a questionnaire a few months before a change was made in their shift schedule and 10 months after the change. Fourteen workers also filled out a diary, carried activity loggers, and carried out reaction-time tests (beginning and end of shift). Fourteen day workers served as a reference group for the questionnaires and 9 were intensively studied during a week with workdays and a free weekend. The questionnaire data showed that the shift change increased satisfaction with workhours, sleep, and time for social activities. Health, perceived accident risk, and reaction-time performance were not negatively affected. Alertness improved and subjective recovery time after night work decreased. The quick changes in the 8-hour schedule greatly increased sleep problems and fatigue. Sleepiness integrated across the entire shift cycle showed that the shift workers were less alert than the day workers, across workdays and days off (although alertness increased with the 12-hour shift). The change from 8-hour to 12-hour shifts was positive in most respects, possibly due to the shorter sequences of the workdays, the longer sequences of consecutive days off, the fewer types of shifts (easier planning), and the elimination of quick changes. The results may differ in groups with a higher work load.

  5. Catheter-Related Bloodstream Infections in Patients on Emergent Hemodialysis.

    PubMed

    Rojas-Moreno, Christian A; Spiegel, Daniel; Yalamanchili, Venkata; Kuo, Elizabeth; Quinones, Henry; Sreeramoju, Pranavi V; Luby, James P

    2016-03-01

    This study had 2 objectives: (1) to describe the epidemiology of catheter-related bloodstream infections (CRBSI) in patients with end-stage renal disease (ESRD) who have no access to scheduled dialysis and (2) to evaluate whether a positive culture of the heparin-lock solution is associated with subsequent development of bacteremia. Retrospective observational cohort design for objective 1; and prospective cohort design for objective 2. The study was conducted in a 770-bed public academic tertiary hospital in Dallas, Texas. The participants were patients with ESRD undergoing scheduled or emergent hemodialysis. We reviewed the records of 147 patients who received hemodialysis between January 2011 and May 2011 and evaluated the rate of CRBSI in the previous 5 years. For the prospective study, we cultured the catheter heparin-lock solution in 62 consecutive patients between June 2012 and August 2012 and evaluated the incidence of CRBSI at 6 months. Of the 147 patients on emergent hemodialysis, 125 had a tunneled catheter, with a CRBSI rate of 2.61 per 1,000 catheter days. The predominant organisms were Gram-negative rods (GNR). In the prospective study, we found that the dialysis catheter was colonized more frequently in patients on emergent hemodialysis than in those on scheduled hemodialysis. Colonization with GNR or Staphylococcus aureus was associated with subsequent CRBSI at 6 months follow-up. Patients undergoing emergent hemodialysis via tunneled catheter are predisposed to Gram-negative CRBSI. Culturing the heparin-lock solution may predict subsequent episodes of CRBSI if it shows colonization with GNR or Staphylococcus aureus. Prevention approaches in this population need to be studied further.

  6. CrossTalk: The Journal of Defense Software Engineering. Volume 21, Number 4

    DTIC Science & Technology

    2008-04-01

    stability characteristics to those extensively reported for the Cost Performance Index in Earned Value Management . by Kym Henderson and Dr. Ofer...Zwikael Schedule Adherence:A Useful Measure for Project Management This article utilizes the new practice of Earned Schedule to discuss a proposed...measure for further enhancing the practice of Earned Value Management . by Walt Lipke A Review of Boundary Value Analysis Techniques This article reviews

  7. Scheduling and Topology Design in Networks with Directional Antennas

    DTIC Science & Technology

    2017-05-19

    emergency response networks was recently studied in [14] and [15]. This work examines the topology control problem in group - based wireless networks that...Broadcast Fig. 7: Max-min throughput ⇢ versus number of nodes for non -uniform edge capacities [14] T. Suzuki, et al. “Directional Antenna Control based...Scheduling and Topology Design in Networks with Directional Antennas Thomas Stahlbuhk, Nathaniel M. Jones, Brooke Shrader Lincoln Laboratory

  8. An Analysis of Mission Critical Computer Software in Naval Aviation

    DTIC Science & Technology

    1991-03-01

    No. Task No. Work Unit Accesion Number 11. TITLE (Include Security Classification) AN ANALYSIS OF MISSION CRITICAL COMPUTER SOFTWARE IN NAVAL AVIATION...software development schedules were sustained without a milestone change being made. Also, software that was released to the fleet had no major...fleet contain any major defects? This research has revealed that only about half of the original software development schedules were sustained without a

  9. Improving Intercontinental Ballistic Missile Maintenance Scheduling Through the Use of Location Analysis Methodologies

    DTIC Science & Technology

    2006-03-01

    Requirements for the Degree of Master of Science in Logistics Management Dale L. Overholts II, BS Capt, USAF March 2006 APPROVED...distance (e. g . , travel time or cost, demand satisfaction) is fundamental to such problems” (Current et al, 2002:86). The set covering location... the total number of scheduled launch facilities, can be found in Appendix F. Appendix G provides detailed information regarding the impacts of

  10. Shift work schedule and night work load: Effects on body mass index - a four-year longitudinal study.

    PubMed

    Buchvold, Hogne Vikanes; Pallesen, Ståle; Waage, Siri; Bjorvatn, Bjørn

    2018-05-01

    Objectives The aim of this study was to investigate changes in body mass index (BMI) between different work schedules and different average number of yearly night shifts over a four-year follow-up period. Methods A prospective study of Norwegian nurses (N=2965) with different work schedules was conducted: day only, two-shift rotation (day and evening shifts), three-shift rotation (day, evening and night shifts), night only, those who changed towards night shifts, and those who changed away from schedules containing night shifts. Paired student's t-tests were used to evaluate within subgroup changes in BMI. Multiple linear regression analysis was used to evaluate between groups effects on BMI when adjusting for BMI at baseline, sex, age, marital status, children living at home, and years since graduation. The same regression model was used to evaluate the effect of average number of yearly night shifts on BMI change. Results We found that night workers [mean difference (MD) 1.30 (95% CI 0.70-1.90)], two shift workers [MD 0.48 (95% CI 0.20-0.75)], three shift workers [MD 0.46 (95% CI 0.30-0.62)], and those who changed work schedule away from [MD 0.57 (95% CI 0.17-0.84)] or towards night work [MD 0.63 (95% CI 0.20-1.05)] all had significant BMI gain (P<0.01) during the follow-up period. However, day workers had a non-significant BMI gain. Using adjusted multiple linear regressions, we found that night workers had significantly larger BMI gain compared to day workers [B=0.89 (95% CI 0.06-1.72), P<0.05]. We did not find any significant association between average number of yearly night shifts and BMI change using our multiple linear regression model. Conclusions After adjusting for possible confounders, we found that BMI increased significantly more among night workers compared to day workers.

  11. Neurological Adverse Effects in Patients of Advanced Colorectal Carcinoma Treated with Different Schedules of FOLFOX

    PubMed Central

    Najam, Rahila; Mateen, Ahmed

    2013-01-01

    The study is designed to assess the frequency and severity of few dose limiting neurological adverse effects of four different schedules of FOLFOX. Patients with histologically confirmed advanced colorectal carcinoma (CRC) were included in the study. Toxicity was graded according to CTC v 2.0. The frequency of grade 3 and 4 adverse effects was comparatively assessed in each treatment arm. The difference in the pattern of toxicity between the treatment schedule was evaluated. The most frequent adverse symptom of neurological adverse effect was grade 1 paresthesia in the patients treated with FOLFOX4 schedule. Grade 4 peripheral neuropathy was reported in few patients of FOLFOX7 treatment arm. Frequency and onset of neurological adverse effects like paresthesia, dizziness, and hypoesthesia were significantly different (P < 0.05), whereas frequency and onset of peripheral neuropathy were highly significant (P < 0.01) in each treatment arm of FOLFOX. Peripheral neuropathy was associated with electrolyte imbalance and diabetes in few patients. Frequency of symptoms, for example, paresthesia, is associated with increased number of recurrent exposure to oxaliplatin (increased number of cycles) even at low doses (85 mg/m2), whereas severity of symptoms, for example, peripheral neuropathy, is associated with higher dose (130 mg/m2) after few treatment cycles. PMID:24187619

  12. Is presence of bacteria in preoperative microscopic urinalysis of the patients scheduled for cardiac surgery a reason for cancellation of elective operation?

    PubMed

    Soltanzadeh, Mansoor; Ebadi, Ahmad

    2013-01-01

    In some hospitals, urinalysis is done routinely for all patients scheduled for cardiac surgery. Occasionally pyuria or bacteria is reported in the microscopic urinalysis of these patients that are clinically asymptomatic for urinary tract infections. WE WERE SEEKING ANSWER TO THIS QUESTION: is the presence of a different number of bacteria in preoperative microscopic urinalysis of asymptomatic patients scheduled for cardiac surgery indicative of potential postoperative complications and as a result, a good reason to postpone the operation? We conducted a retrospective cross-sectional study based on the review of the medical records of 1165 patients who underwent open-heart surgery. One hundered and fifty one patients were eligible in our established criteria. There were no significant difference between their demographic characteristics and the same number of randomly selected patients with normal urinalysis who had underwent open-heart surgery. In the bacteriuria group, two patients, and in the control group, three patients had an infection at the operation sites in the post-operative period, which was not a significant finding between two groups (P = 0.503). We recommend that in the absence of symptoms of urinary tract infection, urinalysis is not necessary and not cost beneficial in the preoperative evaluation of patients scheduled for open-heart surgery.

  13. Using mean duration and variation of procedure times to plan a list of surgical operations to fit into the scheduled list time.

    PubMed

    Pandit, Jaideep J; Tavare, Aniket

    2011-07-01

    It is important that a surgical list is planned to utilise as much of the scheduled time as possible while not over-running, because this can lead to cancellation of operations. We wished to assess whether, theoretically, the known duration of individual operations could be used quantitatively to predict the likely duration of the operating list. In a university hospital setting, we first assessed the extent to which the current ad-hoc method of operating list planning was able to match the scheduled operating list times for 153 consecutive historical lists. Using receiver operating curve analysis, we assessed the ability of an alternative method to predict operating list duration for the same operating lists. This method uses a simple formula: the sum of individual operation times and a pooled standard deviation of these times. We used the operating list duration estimated from this formula to generate a probability that the operating list would finish within its scheduled time. Finally, we applied the simple formula prospectively to 150 operating lists, 'shadowing' the current ad-hoc method, to confirm the predictive ability of the formula. The ad-hoc method was very poor at planning: 50% of historical operating lists were under-booked and 37% over-booked. In contrast, the simple formula predicted the correct outcome (under-run or over-run) for 76% of these operating lists. The calculated probability that a planned series of operations will over-run or under-run was found useful in developing an algorithm to adjust the planned cases optimally. In the prospective series, 65% of operating lists were over-booked and 10% were under-booked. The formula predicted the correct outcome for 84% of operating lists. A simple quantitative method of estimating operating list duration for a series of operations leads to an algorithm (readily created on an Excel spreadsheet, http://links.lww.com/EJA/A19) that can potentially improve operating list planning.

  14. Use of an administrative data set to determine optimal scheduling of an alcohol intervention worker.

    PubMed

    Peterson, Timothy A; Desmond, Jeffrey S; Cunningham, Rebecca

    2012-06-01

    Brief alcohol interventions are efficacious in reducing alcohol-related consequences among emergency department (ED) patients. Use of non-clinical staff may increase alcohol screening and intervention; however, optimal scheduling of an alcohol intervention worker (AIW) is unknown. Determine optimal scheduling of an AIW based on peak discharge time of alcohol-related ED visits. Discharge times for consecutive patients with an alcohol-related diagnosis were abstracted from an urban ED's administrative data set from September 2005 through August 2007. Queuing theory was used to identify optimal scheduling. Data for weekends and weekdays were analyzed separately. Stationary independent period-by-period analysis was performed for hourly periods. An M/M/s queuing model, for Markovian inter-arrival time/Markovian service time/and potentially more than one server, was developed for each hour assuming: 1) a single unlimited queue; 2) 75% of patients waited no longer than 30 min for intervention; 3) AIW spent an average 20 min/patient. Estimated average utilization/hour was calculated; if utilization/hour exceeded 25%, AIW staff was considered necessary. There were 2282 patient visits (mean age 38 years, range 11-84 years). Weekdays accounted for 45% of visits; weekends 55%. On weekdays, one AIW from 6:00 a.m.-9:00 a.m. (max utilization 42%/hour) would accommodate 28% of weekday alcohol-related patients. On weekends, 5:00 a.m.-11:00 a.m. (max utilization 50%), one AIW would cover 54% of all weekend alcohol-related visits. During other hours the utilization rate falls below 25%/hour. Evaluating 2 years of discharge data revealed that 30 h of dedicated AIW time--18 weekend hours (5:00 a.m.-11:00 a.m.), 12 weekday hours (6:00 a.m.-9:00 a.m.)--would allow maximal patient alcohol screening and intervention with minimal additional burden to clinical staff. Copyright © 2012 Elsevier Inc. All rights reserved.

  15. Adaptation to shift work: physiologically based modeling of the effects of lighting and shifts' start time.

    PubMed

    Postnova, Svetlana; Robinson, Peter A; Postnov, Dmitry D

    2013-01-01

    Shift work has become an integral part of our life with almost 20% of the population being involved in different shift schedules in developed countries. However, the atypical work times, especially the night shifts, are associated with reduced quality and quantity of sleep that leads to increase of sleepiness often culminating in accidents. It has been demonstrated that shift workers' sleepiness can be improved by a proper scheduling of light exposure and optimizing shifts timing. Here, an integrated physiologically-based model of sleep-wake cycles is used to predict adaptation to shift work in different light conditions and for different shift start times for a schedule of four consecutive days of work. The integrated model combines a model of the ascending arousal system in the brain that controls the sleep-wake switch and a human circadian pacemaker model. To validate the application of the integrated model and demonstrate its utility, its dynamics are adjusted to achieve a fit to published experimental results showing adaptation of night shift workers (n = 8) in conditions of either bright or regular lighting. Further, the model is used to predict the shift workers' adaptation to the same shift schedule, but for conditions not considered in the experiment. The model demonstrates that the intensity of shift light can be reduced fourfold from that used in the experiment and still produce good adaptation to night work. The model predicts that sleepiness of the workers during night shifts on a protocol with either bright or regular lighting can be significantly improved by starting the shift earlier in the night, e.g.; at 21:00 instead of 00:00. Finally, the study predicts that people of the same chronotype, i.e. with identical sleep times in normal conditions, can have drastically different responses to shift work depending on their intrinsic circadian and homeostatic parameters.

  16. Adaptation to Shift Work: Physiologically Based Modeling of the Effects of Lighting and Shifts’ Start Time

    PubMed Central

    Postnova, Svetlana; Robinson, Peter A.; Postnov, Dmitry D.

    2013-01-01

    Shift work has become an integral part of our life with almost 20% of the population being involved in different shift schedules in developed countries. However, the atypical work times, especially the night shifts, are associated with reduced quality and quantity of sleep that leads to increase of sleepiness often culminating in accidents. It has been demonstrated that shift workers’ sleepiness can be improved by a proper scheduling of light exposure and optimizing shifts timing. Here, an integrated physiologically-based model of sleep-wake cycles is used to predict adaptation to shift work in different light conditions and for different shift start times for a schedule of four consecutive days of work. The integrated model combines a model of the ascending arousal system in the brain that controls the sleep-wake switch and a human circadian pacemaker model. To validate the application of the integrated model and demonstrate its utility, its dynamics are adjusted to achieve a fit to published experimental results showing adaptation of night shift workers (n = 8) in conditions of either bright or regular lighting. Further, the model is used to predict the shift workers’ adaptation to the same shift schedule, but for conditions not considered in the experiment. The model demonstrates that the intensity of shift light can be reduced fourfold from that used in the experiment and still produce good adaptation to night work. The model predicts that sleepiness of the workers during night shifts on a protocol with either bright or regular lighting can be significantly improved by starting the shift earlier in the night, e.g.; at 21∶00 instead of 00∶00. Finally, the study predicts that people of the same chronotype, i.e. with identical sleep times in normal conditions, can have drastically different responses to shift work depending on their intrinsic circadian and homeostatic parameters. PMID:23308206

  17. Incentive Compatible Online Scheduling of Malleable Parallel Jobs with Individual Deadlines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, Thomas E.; Grosu, Daniel

    2010-09-13

    We consider the online scheduling of malleable jobs on parallel systems, such as clusters, symmetric multiprocessing computers, and multi-core processor computers. Malleable jobs is a model of parallel processing in which jobs adapt to the number of processors assigned to them. This model permits the scheduler and resource manager to make more efficient use of the available resources. Each malleable job is characterized by arrival time, deadline, and value. If the job completes by its deadline, the user earns the payoff indicated by the value; otherwise, she earns a payoff of zero. The scheduling objective is to maximize the summore » of the values of the jobs that complete by their associated deadlines. Complicating the matter is that users in the real world are rational and they will attempt to manipulate the scheduler by misreporting their jobs’ parameters if it benefits them to do so. To mitigate this behavior, we design an incentive compatible online scheduling mechanism. Incentive compatibility assures us that the users will obtain the maximum payoff only if they truthfully report their jobs’ parameters to the scheduler. Finally, we simulate and study the mechanism to show the effects of misreports on the cheaters and on the system.« less

  18. SMS text messaging improves outpatient attendance.

    PubMed

    Downer, Sean R; Meara, John G; Da Costa, Annette C; Sethuraman, Kannan

    2006-08-01

    To evaluate the operational and financial efficacy of sending short message service (SMS) text message reminders to the mobile telephones of patients with scheduled outpatient clinic appointments. Cohort study with historical control. Royal Children's Hospital, Melbourne, Victoria. Patients who gave a mobile telephone contact number and were scheduled to attend an outpatient clinic at the Royal Children's Hospital, Melbourne in October, November and December 2004 (trial group) or in October, November and December 2003 (historical control group). Failure-to-attend (FTA) rate compared between the trial group, whose members were sent a reminder, and the historical control group, whose members were not sent a reminder. Financial benefits versus cost of sending reminders. 22,658 patients with a mobile telephone contact number scheduled to attend an outpatient clinic appointment in October, November and December 2004 were sent an SMS reminder; 20,448 (90.2%) of these patients attended their appointment. The control group included 22,452 patients with a mobile telephone contact number scheduled to attend an appointment, with 18,073 (80.5%) patients attending. The FTA rate was significantly lower in the trial group than in the historical control group (9.8% v 19.5%; P < 0.001). The cost of sending the SMS reminders was small compared with the increase in patient revenue and associated benefits generated as a result of improved attendance. The observed reduction in FTA rate was in line with that found using traditional reminder methods and a prior pilot study using SMS. The FTA reduction coupled with the increase in patient revenue suggests that reminding patients using SMS is a very cost effective approach for improving patient attendance.

  19. Quantifying Social Motivation in Mice Using Operant Conditioning.

    PubMed

    Martin, Loren; Iceberg, Erica

    2015-08-08

    In this protocol, social motivation is measured in mice through a pair of operant conditioning paradigms. To conduct the experiments, two-chambered shuttle boxes were equipped with two operant levers (left and right) and a food receptacle in one chamber, which was then divided from the second chamber by an automated guillotine door covered by a wire grid. Different stimulus mice, rotated across testing days, served as a social stimulus behind the wire grid, and were only visible following the opening of the guillotine door. Test mice were trained to lever press in order to open the door and gain access to the stimulus partner for 15 sec. The number of lever presses required to obtain the social reward progressively increased on a fixed schedule of 3. Testing sessions ended after test mice stopped lever pressing for 5 consecutive minutes. The last reinforced ratio or breakpoint can be used as a quantitative measure of social motivation. For the second paradigm, test mice were trained to discriminate between left and right lever presses in order to obtain either a food reward or the social reward. Mice were rewarded for every 3 presses of each respective lever. The number of food and social rewards can be compared as a measurement of the value placed upon each reward. The ratio of each reward type can also be compared between mouse strains and the change in this ratio can be monitored within testing sessions to measure satiation with a given reward type. Both of these operant conditioning paradigms are highly useful for the quantification of social motivation in mouse models of autism and other disorders of social behavior.

  20. Daytime continuous polysomnography predicts MSLT results in hypersomnias of central origin.

    PubMed

    Pizza, Fabio; Moghadam, Keivan K; Vandi, Stefano; Detto, Stefania; Poli, Francesca; Mignot, Emmanuel; Ferri, Raffaele; Plazzi, Giuseppe

    2013-02-01

    In the diagnostic work-up of hypersomnias of central origin, the complaint of excessive daytime sleepiness should be objectively confirmed by MSLT findings. Indeed, the features and diagnostic utility of spontaneous daytime sleep at 24 h continuous polysomnography (PSG) have never been investigated. We compared daytime PSG features to MSLT data in 98 consecutive patients presenting with excessive daytime sleepiness and with a final diagnosis of narcolepsy with cataplexy/hypocretin deficiency (n = 39), narcolepsy without cataplexy (n = 7), idiopathic hypersomnia without long sleep time (n = 19), and 'hypersomnia' with normal sleep latency at MSLT (n = 33). Daytime sleep time was significantly higher in narcolepsy-cataplexy but similar in the other groups. Receiver operating characteristics (ROC) curves showed that the number of naps during daytime PSG predicted a mean sleep latency ≤8 min at MSLT with an area under the curve of 0.67 ± 0.05 (P = 0.005). The number of daytime sleep-onset REM periods (SOREMPs) in spontaneous naps strikingly predicted the scheduled occurrence of two or more SOREMPs at MSLT, with an area under the ROC curve of 0.93 ± 0.03 (P < 10(-12) ). One spontaneous SOREMP during daytime had a sensitivity of 96% with specificity of 74%, whereas two SOREMPs had a sensitivity of 75%, with a specificity of 95% for a pathological REM sleep propensity at MSLT. The features of spontaneous daytime sleep well correlated with MSLT findings. Notably, the occurrence of multiple spontaneous SOREMPs during daytime clearly identified patients with narcolepsy, as well as during the MSLT. © 2012 European Sleep Research Society.

Top