Science.gov

Sample records for conservation project final

  1. Home Energy Conservation Training Project. Final Report.

    ERIC Educational Resources Information Center

    West Virginia Univ., Morgantown. Coll. of Human Resources and Education.

    Described is a project designed to present four training sessions for community specialists representing outreach interests such as cooperative extension, senior citizens organizations, and welfare agencies. Training consists of instruction in contemporary knowledge, skills, and methods of home energy conservation, and in how to teach others to…

  2. Energy conservation in citrus processing. Final project report

    SciTech Connect

    Leo, M.A.; Lari, R.I.; Moore, N.R.; Broussard, M.R.; Gyamfi, M.

    1981-11-01

    Alternative energy conserving systems for use in citrus processing plants were synthesized and evaluated in terms of energy savings and economic return. The energy intensive operations that are carried out in citrus processing plants include conveying and extraction, concentration, peel drying, refrigeration, and pasteurization. The alternative energy conserving systems are synthesized from components and subsystems that are arranged to make use of energy cascading and thermodynamic regeneration to reduce the overall energy usage. System requirements such as air pollution rules and plant processing load cycles, a characterization of major operations, description of alternative system concepts, and the evaluation of alternative systems in terms of economic parameters and energy usage are identified.

  3. Municipal-building conservation project: financing conservation in municipal buildings. Final report

    SciTech Connect

    Gatton, David; Mounts, Richard; Scrimger, Kay; Wood, Elizabeth; Musselwhite, Ron; Wanning, Helen; Frazier, Andrew; Pyles, Odessa

    1982-01-01

    The purpose of this survey was to assess one dimension of the energy problem that confronts cities - energy costs for public buildings - and to see how a sample of local governments had confronted that problem. While cities of all sizes tend to have a considerable variety of buildings, most are related to the basic municipal service of administration, police and fire protection, public works, and recreation. Most of these buildings consume natural gas and electricity as their primary source of energy, sources whose price is likely to rise more rapidly than the rate of inflation in the next few years. While it is difficult to assess the reports of energy costs without comparing them to the total city budget, these costs were found to be sizable among small and medium cities, and quite large among larger cities. While several of the conservation programs in the sample dated back to 1976, almost half (14) were relatively new, having been undertaken only in the last three years. Administratively, most have been placed under the direction of budget or public works officials, and, substantively, have emphasized no-cost/low-cost measures, such as employee awareness programs and improvements in building maintenance. In keeping with this, most of the programs have been supported by reprogramming funds, supplemented with local capital improvement funds, and state and federal grants. Case studies for five localities are appended.

  4. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    SciTech Connect

    Loewen, J.M.; Levine, M.D.; Busch, J.F.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  5. ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology

    SciTech Connect

    Levine, M.D.; Busch, J.F.

    1992-06-01

    This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

  6. Data compilation for Conservation Effects Assessment Project: Yalobusha River Watershed, final report

    Technology Transfer Automated Retrieval System (TEKTRAN)

    There is increasing private and public interest in whether the investment in conservation practice installation has been a worthy use of public funding. As part of the 2002 Farm Bill, the USDA spends around $4 billion annually on the following conservation programs: Environmental Quality Incentive ...

  7. Conservation Science Fair Projects.

    ERIC Educational Resources Information Center

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  8. Final Report and Evaluation of Project S.P.R.U.C.E. (Science Project Related to Upgrading Conservation Education).

    ERIC Educational Resources Information Center

    Busch, Phyllis S.

    Presented is an environmental approach to elementary school science teaching. The inquiry approach is stressed and outdoor activities are integrated with classroom activities. A variety of curricular materials were developed to be used in conjunction with the New York State Elementary Science Curriculum. The project also provided workshops for…

  9. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  10. Prometheus Project final report

    NASA Technical Reports Server (NTRS)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  11. Conservation Education Improvement. Final Report.

    ERIC Educational Resources Information Center

    Diem, Kenneth L.; Hennebry, Howard M.

    In an attempt to improve the teaching of conservation in elementary and junior high schools, a set of integrated sequential core units was formulated and tested in five Wyoming school districts during the fall and early winter of 1968. Based on a total sample of 840 elementary students (38% usable response) and 960 junior high students (49% usable…

  12. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  13. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Fish and Wildlife Service Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION... received from the Montana Department of Natural Resources and Conservation (DNRC) a Final...

  14. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  15. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  16. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  17. Partner Project. Final Report.

    ERIC Educational Resources Information Center

    Arizona Univ., Tucson. Dept. of Special Education.

    The study investigated the effectiveness of the Partner Project, a participation strategy on the participation of learning disabled high school students and their parents during the annual individualized education program (IEP) conference. Eleven students and their parents received the IEP participation strategy training which focused on…

  18. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  19. Project Final Report

    NASA Technical Reports Server (NTRS)

    Ciolkosz, Daniel; Albright, Louis

    1999-01-01

    The initial focus of this GSRP project was to model and develop systems for optimized use of the Microwave lamp for use in bioregenerative life support systems (BLSS). The microwave lamp, which has been developed for use in BLSS as part of a NASA small business innovation research (SBIR) grant, exhibits a number of characteristics that make it an excellent candidate for use in BLSS. However, we decided to shift the focus of the project, after discussions with scientists at KSC, to a broader question. Specifically, we decided to investigate the possibility of developing a decision tool for characterizing overall fighting system effectiveness in a plant growth system. It seemed pointless to optimize a microwave lamp for BLSS when there was no good way to decide what exactly an optimized system would look like. The problem is a complex one, involving multiple, conflicting objectives with irreconcilable units, significant constraints, and a wide range of relative importance among the objectives. The project would involve not only characterizing this complex decision process, but also would require some investigations into the physical properties of the lighting systems being considered. Thus, we turned to the field of Decision Modeling as a means of meeting this objective. After a thorough investigation of the literature, a technique was chosen and carefully developed. Implementation and analysis of the system are still in progress, and should be completed during the summer of 1999. Ancillary studies, which were conducted in the course of the project, have also been conducted, and are summarized below.

  20. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  1. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  2. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  3. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  4. Final Project Report

    SciTech Connect

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  5. Final Project Report

    SciTech Connect

    Carrick M. Eggleston

    2003-12-12

    This report provides a description of the main accomplishments of the EMSP funded research, including products such as conference presentations and publications (including those still in preparation). The purpose of this study was to better understand the chemical interactions between dissolved aqueous contaminants and carbonate minerals occurring as coatings on mineral grains in the vadose zone beneath the Hanford reserve. This information is important for construction of improved reactive transport models intended to predict the subsurface migration of contaminants. We made improvements to the hydrothermal atomic force microscope (HAFM) design to be used in this project. The original HAFM was built with funding from the U.S. DOE, Office of Basic Energy Sciences. Improvements include operating limits of 70 bars and 170 C, from an original limit of 12 bars and 150 C. This product is patented. We completed a series of studies of magnesite, MgCO3, because this mineral is structurally equivalent to calcite but reacts much more slowly, allowing us to study carbonate reactivity under pH conditions (i.e., low pH) that are much more problematic for studies of calcite but which are nevertheless relevant to in-situ conditions. We found that dissolving magnesite exhibits a dramatic change in step orientation, and therefore etch pit shape, as pH is lowered through 4.2 to 3 and 2. This change in step orientation is NOT accompanied by an increase in step velocity with decreasing pH. We also found that, after growing magnesite on a magnesite substrate, the newly grown magnesite dissolved much more readily than the underlying substrate magnesite, and exhibited far larger etch pit densities. This effect may have been related to the rate of growth or to the presence of an Fe impurity in the growth solutions. We studied the dissolution of magnesite and calcite (104) surfaces under a wider variety of conditions with a new hydrodynamically defined hydro thermal AFM fluid cell, and we

  6. 78 FR 14111 - Final Candidate Conservation Agreement With Assurances, Final Environmental Assessment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Fish and Wildlife Service Final Candidate Conservation Agreement With Assurances, Final Environmental... Environmental Policy Act of 1969 (NEPA). The Oklahoma Department of Wildlife Conservation (ODWC) applied for an... conservation (e.g., prescribed burning, prescribed grazing, upland wildlife habitat management,...

  7. Subjective risk assessment for planning conservation projects

    NASA Astrophysics Data System (ADS)

    Game, Edward T.; Fitzsimons, James A.; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-12-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner.

  8. A Learning Package in Energy Conservation for Participants in the Home Building Industry. Final Report.

    ERIC Educational Resources Information Center

    Houston Univ., TX. College of Architecture.

    Presented is the final report for a project designed to develop an experimental learning package for educating participants in the home building industry in energy conservation. The project addresses deficiencies in the present knowledge status of members of the home building industry, effective marketing techniques for energy conserving homes,…

  9. Increasing the impact of conservation projects.

    PubMed

    Dietz, Lou Ann; Brown, Marcia; Swaminathan, Vinaya

    2010-05-01

    To assure a future for endangered primates and many other species, we must develop and carry out projects for their conservation as quickly and effectively as possible, even with only limited information about the complex systems of biological, political, social, economic, and cultural factors influencing the conservation situation. Adaptive management, defined as the integration of design, management, and monitoring to systematically test assumptions to learn and adapt, provides practitioners a method for improving strategies to achieve and sustain the desired conservation impact. The Conservation Measures Partnership, a joint venture of conservation NGOs, developed the Open Standards for the Practice of Conservation, a freely available framework that guides practitioners through implementation of best conservation practices. Using this process, project teams are explicit about the assumptions behind the strategies they choose, and thus able to trace their successes and failures back to good or poor theory, implementation, or a combination of the two. The Open Standards comprise five steps that constitute the project management cycle: (1) Conceptualize what you will achieve in the context of where you are working--involves defining your project team, scope, vision, conservation targets, critical threats, and analyzing the situation; (2) Plan your actions and monitoring--involves developing an action plan including goals, strategies, assumptions, objectives, and activities; a monitoring plan including indicators for measuring the status of goals, objectives, and assumptions; and an operational plan specifying the resources needed; (3) Implement your actions and monitoring--includes developing and implementing detailed work plans and ensuring sufficient resources, capacity, and partners; (4) Analyze, use, and adapt--involves managing monitoring data, regular analysis to convert them to useful information, and adapting the project plans accordingly; and (5) Capture

  10. Energy Conservation Research Study. Final Report.

    ERIC Educational Resources Information Center

    Cayemberg, Merlin; And Others

    This study explored the availability of energy conservation programs at community colleges; the apparent need for such programs or courses by industry, business, and government; and the types of programs, if any, which should be offered at the vocational/technical level. Information was sought from 52 current two-year programs, the fifty state…

  11. Conservation trend indicators. Interim and final report

    SciTech Connect

    Peterson, C.

    1980-08-21

    This report outlines major conservation trends for the four US energy consuming sectors: residential, commercial, industrial, and transportation. Tables on residential use include data on gas, electricity, and fuel oil. Data is not available for renewable sources or for bottled gas, kerosene, or propane. Commercial data is also reported for gas, electricity, and fuel oil, and total consumption is examined on a square foot basis. Industrial trends are shown for the ten most energy intensive industries. In addition, industrial efficiencies by fuel are analyzed. For the transportation sector, petroleum products (particularly gasoline) are the major fuels considered, and selected energy intensities are examined. The discussion on each sector will cover findings, data sources, and data interpretation. Recommendations on reporting are part of the residential section of this report.

  12. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  13. 75 FR 1651 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... Fish and Wildlife Service Multistate Conservation Grant Program; Priority List for Conservation... of wildlife and sport fish conservation projects from the Association of Fish and Wildlife Agencies... submits a list of projects to us each year to consider for funding under the Multistate Conservation...

  14. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  15. Project Winamac. Final Performance Report.

    ERIC Educational Resources Information Center

    El-Tip-Wa Adult Learning Center, Logansport, IN.

    A workplace literacy partnership project was conducted to upgrade the basic skills and productivity of 287 hourly wage earners of Winamac Spring Company (WSC) in Indiana. WSC paid employee wages for up to 24 hours of training and provided a classroom facility. El-Tip-Wa Adult Learning Center instructional staff provided basic skills training using…

  16. The MUST Project. Final Report.

    ERIC Educational Resources Information Center

    Atlanta Public Schools, GA.

    Described are planning and operational phases of the Media Utilization Services for Teachers (MUST) Project, an effort to utilize media to individualize and improve instruction for educable mentally retarded (EMR) elementary school students. Aspects of the planning period (1969-70) treated include staffing and orientation procedures, limitation of…

  17. Project HEED. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    During 1972-73, Project HEED (Heed Ethnic Educational Depolarization) involved 1,350 Indian students in 60 classrooms at Sells, Topowa, San Carlos, Rice, Many Farms, Hotevilla, Peach Springs, and Sacaton. Primary objectives were: (1) improvement in reading skills, (2) development of cultural awareness, and (3) providing for the Special Education…

  18. Competitive Skills Project. Final Report.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    Almost 180 (22.5 percent) of BP Chemicals/HITCO, Inc. (BPCHI) employees have participated in the basic skills courses offered through the Competitive Skills Project (CSP) at El Camino College (Torrance, California). Workplace basics provide a solid foundation for Total Quality Management (TQM), enabling workers to be globally competitive. Two main…

  19. The ELEXTEC Project. Final Report.

    ERIC Educational Resources Information Center

    Chapman, George L.

    The ELEXTEC project was initiated to provide better technical education to students enrolled in electronics technology. It was designed to convert a set of materials developed by the U.S. Air Force for teaching electronic principles in a form which could be utilized by civilian technical education institutions. Fourteen colleges participated in…

  20. Project Open Door. Final Report.

    ERIC Educational Resources Information Center

    Verheyden-Hilliard, Mary Ellen

    The major purpose of Project Open Door was to design, develop, test, and disseminate a portable module for vocational educators and others to use with junior high school students in pre-vocational exploration free of sex stereotyping. The module produced contained a slide presentation with accompanying cassette tape and a leader's guide. An…

  1. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  2. Design Alternatives for Evaluating the Impact of Conservation Projects

    ERIC Educational Resources Information Center

    Margoluis, Richard; Stem, Caroline; Salafsky, Nick; Brown, Marcia

    2009-01-01

    Historically, examples of project evaluation in conservation were rare. In recent years, however, conservation professionals have begun to recognize the importance of evaluation both for accountability and for improving project interventions. Even with this growing interest in evaluation, the conservation community has paid little attention to…

  3. 76 FR 793 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... Fish and Wildlife Service Multistate Conservation Grant Program; Priority List for Conservation... the FY 2011 priority list of wildlife and sport fish conservation projects from the Association of... Multistate Conservation Grant program. We have reviewed the list and will award the grants from the...

  4. Curriculum for Energy Use and Conservation Technicians. Final Report.

    ERIC Educational Resources Information Center

    Hull Daniel M.

    A project designed a national curriculum model for Energy Conservation-and-Use Technicians (ECUTs) and developed and tested instructional materials for use in the courses. The two-year postsecondary ECUT curriculum was designed to provide an interdisciplinary technical base (electrical, mechanical, thermal, and fluidal principles) and technical…

  5. Environmental Quality and Energy Conservation Curriculum Model. Final Report.

    ERIC Educational Resources Information Center

    Havemen, Jacqueline E.; O'Connell, Kathryn

    To provide postsecondary vocational educators with a comprehensive understanding of environmental quality and energy conservation and their relevance to all occupational fields, a project designed a generic curriculum model for postsecondary adult and vocational education and developed documents describing the model. In developing the model, a…

  6. Spray casting project final report

    SciTech Connect

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

  7. EDUCATIONAL MEDIA RESEARCH ABSTRACTING PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    HYER, ANNA L.

    THIS PROJECT PROVIDED ABSTRACTING COVERAGE OF 33 FINAL REPORTS OF U.S. OFFICE OF EDUCATION FINANCED RESEARCH PROJECTS IN EDUCATIONAL MEDIA. AN ABSTRACTOR, DR. WILLIAM ALLEN, WAS HIRED TO EVALUATE AND EDIT OR REWRITE ABSTRACTS SUBMITTED BY RESEARCHERS, AND TO PREPARE ABSTRACTS IF NECESSARY. TWO ANALYTICAL REVIEWS ON SELECTED AREAS OF MEDIA RESEARCH…

  8. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  9. The Let's Play! Project. Final Report.

    ERIC Educational Resources Information Center

    Mistrett, Susan

    This final report reviews activities and achievements of the "Let's Play!" project, an effort to apply assistive technology (AT) to promote the play skills of infants and toddlers with disabilities within their natural environments. The federally supported project was designed to assist county early intervention programs and developed,…

  10. Project Ta-Kos Outreach. Final Report.

    ERIC Educational Resources Information Center

    Askew, Linda; Husted, Tony; Faris, Cindy

    This final report describes activities and accomplishments of Project Ta-Kos Outreach, a 3-year program to provide consultation and site-specific training for families, educators, and health care providers. Project Ta-kos, through its curriculum and training approach, was designed to increase the probability that children, ages birth through eight…

  11. Lagoon Restoration Project: Final report

    SciTech Connect

    1995-03-01

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systems and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.

  12. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  13. Special Education Dissemination Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, Roberta M.

    The final report summarizes activities of a 3-year project which accomplished the following goals: (1) identification of the most pressing concerns in special education currently facing state and local education policymakers; (2) location of research information through the U.S. Department of Education and other sources which address these issues;…

  14. Wisconsin Dissemination Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Harmatuck, Loretta

    Activities of the final year are reported as they relate to the objectives of the Wisconsin Dissemination Planning (WDP) Project: (1) to develop a plan for coordination among the dissemination functions in the Department of Public Instruction (DPI) through a state-wide steering committee; (2) to complete a needs assessment for dissemination…

  15. Hiilangaay Hydroelectric ProjectFinal Report

    SciTech Connect

    Twitchell, Sara; Stimac, Michael; Lang, Lisa; Witwer, Doreen; Jameson, Vincent

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  16. Pataha Creek Model Watershed : 1998 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    1999-12-01

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. 1998 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek.

  17. Multi-faceted energy-conservation program. Final technical report

    SciTech Connect

    Not Available

    1981-01-01

    The purpose of this project was to design and build 19 solar thermosiphoning air panels, insulate walls, generally tighten up the library building, and install other energy conserving devices. Another purpose of the project was to serve as a model to other libraries in Kentucky, to commercial buildings in this area, and to homeowners in the area. After much discussion with architects and among ourselves, we chose a type of solar installation that would be visible to the public and easily replicated. We also carried out a number of procedures to make the library building more energy efficient: installed a 7-day programmable setback thermostat; insulated the walls; improved weatherstripping around the doors; added an economizer control to our air-handling system; and put an electric damper controlling supply air to a large but intermittently usedmeeting room. These changes resulted in approximately $700 in savings from December 1981, through February 1982. Thus far, we have carried out public education with a sign, brochures, press releases, and the purchase of appropriate books; librarians have received our brochure, and some have attended a workshop given here on energy conservation and solar energy.

  18. Conservation Project Shows Substantial Reduction in Home Water Use

    ERIC Educational Resources Information Center

    Sharpe, William E.; Smith, Donald

    1978-01-01

    Describes a water use study-conservation project conducted by the Washington Suburban Sanitary Commission in Maryland. Results show a significant decrease in the amount of water used by home customers over a ten-year period. (Author/MA)

  19. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    ERIC Educational Resources Information Center

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water…

  20. Farm alcohol fuel project. Final report

    SciTech Connect

    Demmel, D.

    1981-11-15

    The Small Energy Project is a research and demonstration effort designed to assist small farmers in the utilization of energy conservation techniques on their farms. The Farm Alcohol Project was designed to demonstrate the production of alcohol fuels on small farms in order to reduce purchased liquid fuel requirements. The Project considered the use of on-farm raw materials for process heat and the production of fuel grade, low prood ethanol in volumes up to 10,000 gallons per year. The fuel would be used entirely on the farm. The approach considered low-cost systems the farmer could build himself from local resources. Various crops were considered for ethanol production. The interest in farm alcohol production reached a peak in 1980 and then decreased substantially as farmers learned that the process of alcohol production on the farm was much more complicated than earlier anticipated. Details of Alcohol Project experiences in ethanol production, primarily from corn, are included in this report. A one-bushel distillation plant was constructed as a learning tool to demonstrate the production of ethanol. The report discusses the various options in starch conversion, fermentation and distillation that can be utilized. The advantages and disavantages of atmospheric and the more complicated process of vacuum distillation are evaluated. Larger farm plants are considered in the report, although no experience in operating such plants was gained through the Project. Various precautions and other considerations are included for farm plant designs. A larger community portable distillery is also evaluated. Such a plant was considered for servicing farms with limited plant equipment. The farms serviced would perform only fermentation tasks, with the portable device performing distillation and starch conversion.

  1. Conservation planning with uncertain climate change projections.

    PubMed

    Kujala, Heini; Moilanen, Atte; Araújo, Miguel B; Cabeza, Mar

    2013-01-01

    Climate change is affecting biodiversity worldwide, but conservation responses are constrained by considerable uncertainty regarding the magnitude, rate and ecological consequences of expected climate change. Here we propose a framework to account for several sources of uncertainty in conservation prioritization. Within this framework we account for uncertainties arising from (i) species distributions that shift following climate change, (ii) basic connectivity requirements of species, (iii) alternative climate change scenarios and their impacts, (iv) in the modelling of species distributions, and (v) different levels of confidence about present and future. When future impacts of climate change are uncertain, robustness of decision-making can be improved by quantifying the risks and trade-offs associated with climate scenarios. Sensible prioritization that accounts simultaneously for the present and potential future distributions of species is achievable without overly jeopardising present-day conservation values. Doing so requires systematic treatment of uncertainties and testing of the sensitivity of results to assumptions about climate. We illustrate the proposed framework by identifying priority areas for amphibians and reptiles in Europe.

  2. Typology of public outreach for biodiversity conservation projects in Spain.

    PubMed

    Jiménez, Amanda; Iniesta-Arandia, Irene; Muñoz-Santos, Maria; Martín-López, Berta; Jacobson, Susan K; Benayas, Javier

    2014-06-01

    Conservation education and outreach programs are a key approach to promote public understanding of the importance of biodiversity conservation. We reviewed 85 biodiversity conservation projects supported by the Spanish Ministry of Environment's Biodiversity Foundation. Through content analysis and descriptive statistics, we examined how the projects carried out communication, education, and public awareness and participation (CEPA) actions. We also used multivariate statistical analysis to develop a typology of 4 classes of biodiversity conservation projects on the basis of CEPA implementation. The classifications were delineated by purpose of CEPA, level of integration of CEPA actions, type of CEPA goals, main CEPA stakeholders, and aim of conservation. Our results confirm the existence of 2 key positions: CEPA has intrinsic value (i.e., they supposed the implementation of any CEPA action indirectly supported conservation) and CEPA is an instrument for achieving conservation goals. We also found that most CEPA actions addressed general audiences and school children, ignored minority groups and women, and did not include evaluation. The characteristics of the 4 types of projects and their frequency of implementation in the sample reflect the need for better integration of different types of actions (communication, education, and participation) and improved fostering of participation of multiple stakeholders in developing policy and implementing management strategies.

  3. Alberta Education Energy Conservation Project. Phase II: Internal Evaluation.

    ERIC Educational Resources Information Center

    Sundmark, Dana

    This report is based on the Alberta Education Energy Conservation Project - Phase II. The project was a follow-up to an earlier study, extending from June 1980 to June 1983, in which government funding and engineering manpower were used to conduct an energy management program in 52 selected pilot schools in 5 areas of the province. The report…

  4. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  5. Final Report for the NERI Project

    SciTech Connect

    John C. Lee

    2009-03-31

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report.

  6. 76 FR 39072 - Notice of Availability of a Final Environmental Impact Statement and Final Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... 0648-XA439 Notice of Availability of a Final Environmental Impact Statement and Final Habitat... Statement and Habitat Conservation Plan. SUMMARY: The National Marine Fisheries Service (NMFS) and the U.S... also announce the availability of Kent's Clark Springs Water Supply System Habitat Conservation...

  7. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  8. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Project Final Environmental Impact Statement and Proposed California Desert Conservation Area Plan... Desert Conservation Area (CDCA) Plan Amendment and Final Environmental Impact Statement (EIS) for the San... governments. Copies are also available in the BLM California Desert District Office at 22835 Calle San Juan...

  9. 78 FR 20687 - Nantucket National Wildlife Refuge, Nantucket, MA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Fish and Wildlife Service Nantucket National Wildlife Refuge, Nantucket, MA; Final Comprehensive Conservation Plan and Finding of No Significant Impact AGENCY: Fish and Wildlife Service, Interior. ACTION... conservation concern using this habitat, providing wildlife-dependent priority public uses when...

  10. The LiveWire Project final report

    SciTech Connect

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.; Dominguez, H.A.

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  11. Salt River Project's Participation in Arizona's Bald Eagle Conservation Efforts

    PubMed

    NOBEL

    1996-11-01

    / Bald eagle ( Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP's participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies.KEY WORDS: Bald eagle conservation; Participatory; Cooperative effort; SRP

  12. Training Manual for the Energy Conservation Analysis Project.

    ERIC Educational Resources Information Center

    Massachusetts Univ., Amherst. Cooperative Extension Service.

    This document is the Massachusetts Energy Extension Service training manual for Residential Energy Auditors. This manual is part of a four-week program to train persons to perform home energy audits and was developed under the Energy Conservation Analysis Project (ECAP) at the University of Massachusetts. The chapter titles include: (1) Project…

  13. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  14. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  15. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  16. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  17. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  18. User manual for the Hanford Energy Conservation Project data base

    SciTech Connect

    Humphreys, K.K.; Fassbender, L.L.; Weakley, S.A.

    1987-09-01

    The Hanford Energy Conservation (HEC) Project Data Base developed by the Pacific Northwest Laboratory for the US Department of Energy's Richland Operations Office, provides a centralized storehouse of information on planned and ongoing projects which are part of the HEC project. The data base will enable quick analysis of the project portfolio. The data base uses dBase III Plus on an IBM PC. Over 40 data items are stored for each project. A menu-driven applications program was developed as an alternative to using standard dBase III Plus commands. The menu-driven program prompts the user to add data, edit data, perform on-screen searches of the data base, sort the data base by any variable or combination of variables, or generate hard-copy reports of the stored data.

  19. 77 FR 76510 - Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ...-4311-K9-S3] Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation... conservation plan (CCP) and environmental impact statement (EIS) for Prime Hook National Wildlife Refuge (NWR... should be consistent with sound principles of fish and wildlife management, conservation, legal...

  20. Collaboration Networks in Applied Conservation Projects across Europe.

    PubMed

    Nita, Andreea; Rozylowicz, Laurentiu; Manolache, Steluta; Ciocănea, Cristiana Maria; Miu, Iulia Viorica; Popescu, Viorel Dan

    2016-01-01

    The main funding instrument for implementing EU policies on nature conservation and supporting environmental and climate action is the LIFE Nature programme, established by the European Commission in 1992. LIFE Nature projects (>1400 awarded) are applied conservation projects in which partnerships between institutions are critical for successful conservation outcomes, yet little is known about the structure of collaborative networks within and between EU countries. The aim of our study is to understand the nature of collaboration in LIFE Nature projects using a novel application of social network theory at two levels: (1) collaboration between countries, and (2) collaboration within countries using six case studies: Western Europe (United Kingdom and Netherlands), Eastern Europe (Romania and Latvia) and Southern Europe (Greece and Portugal). Using data on 1261 projects financed between 1996 and 2013, we found that Italy was the most successful country not only in terms of awarded number of projects, but also in terms of overall influence being by far the most influent country in the European LIFE Nature network, having the highest eigenvector (0.989) and degree centrality (0.177). Another key player in the network is Netherlands, which ensures a fast communication flow with other network members (closeness-0.318) by staying connected with the most active countries. Although Western European countries have higher centrality scores than most of the Eastern European countries, our results showed that overall there is a lower tendency to create partnerships between different organization categories. Also, the comparisons of the six case studies indicates significant differences in regards to the pattern of creating partnerships, providing valuable information on collaboration on EU nature conservation. This study represents a starting point in predicting the formation of future partnerships within LIFE Nature programme, suggesting ways to improve transnational

  1. Collaboration Networks in Applied Conservation Projects across Europe

    PubMed Central

    Manolache, Steluta; Ciocănea, Cristiana Maria; Miu, Iulia Viorica; Popescu, Viorel Dan

    2016-01-01

    The main funding instrument for implementing EU policies on nature conservation and supporting environmental and climate action is the LIFE Nature programme, established by the European Commission in 1992. LIFE Nature projects (>1400 awarded) are applied conservation projects in which partnerships between institutions are critical for successful conservation outcomes, yet little is known about the structure of collaborative networks within and between EU countries. The aim of our study is to understand the nature of collaboration in LIFE Nature projects using a novel application of social network theory at two levels: (1) collaboration between countries, and (2) collaboration within countries using six case studies: Western Europe (United Kingdom and Netherlands), Eastern Europe (Romania and Latvia) and Southern Europe (Greece and Portugal). Using data on 1261 projects financed between 1996 and 2013, we found that Italy was the most successful country not only in terms of awarded number of projects, but also in terms of overall influence being by far the most influent country in the European LIFE Nature network, having the highest eigenvector (0.989) and degree centrality (0.177). Another key player in the network is Netherlands, which ensures a fast communication flow with other network members (closeness—0.318) by staying connected with the most active countries. Although Western European countries have higher centrality scores than most of the Eastern European countries, our results showed that overall there is a lower tendency to create partnerships between different organization categories. Also, the comparisons of the six case studies indicates significant differences in regards to the pattern of creating partnerships, providing valuable information on collaboration on EU nature conservation. This study represents a starting point in predicting the formation of future partnerships within LIFE Nature programme, suggesting ways to improve transnational

  2. TX-100 manufacturing final project report.

    SciTech Connect

    Ashwill, Thomas D.; Berry, Derek S.

    2007-11-01

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three

  3. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  4. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation...

  5. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  6. Chapter 1 Schoolwide Project Study. Final Report.

    ERIC Educational Resources Information Center

    Schenck, E. Allen; Beckstrom, Sharon

    Chapter 1 schoolwide projects are intended to serve educationally disadvantaged students by improving the instructional program provided to all students in high-poverty schools. This report provides a comprehensive look at schoolwide projects in the 1991-92 school year, using data from surveys of all schoolwide project schools. The response rate…

  7. The Utah Newspaper Project. Final Report.

    ERIC Educational Resources Information Center

    Holley, Robert P.

    As part of the United States Newspaper Program, the Marriott Library at the University of Utah undertook the Utah Newspaper Project, a major microfilming project funded by the National Endowment for the Humanities. This report reviews the background of the project, describes the grant application process, and discusses the activities of: (1) the…

  8. High Priority Infant Tracking Project. Final Report.

    ERIC Educational Resources Information Center

    Biro, Patricia J.; And Others

    The study compared the effectiveness of the Washington State High Priority Infant Tracking Project in maintaining high risk infants in continuing health care, determining health and developmental outcomes, and surveying the use of community resources with other state tracking projects. The project identifies infants during the first 30 days of…

  9. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area Plan... 1976, as amended, the Bureau of Land Management (BLM) has prepared a Proposed California...

  10. Salt river project's participation in Arizona's bald eagle conservation efforts

    NASA Astrophysics Data System (ADS)

    Nobel, Teah A.

    1996-11-01

    Bald eagle ( Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP's participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies.

  11. Effect of risk aversion on prioritizing conservation projects.

    PubMed

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  12. Consumer representation for transportation energy conservation. Final report

    SciTech Connect

    Not Available

    1981-07-01

    Programs for conserving energy in the transportation sector have been designed and, in some cases, implemented by various levels of government and in the private sector. Important considerations in the ultimate success of such programs are obtaining consumer support for the programs themselves and encouraging consumers to make energy efficient choices. Since these considerations are similar to factors leading to successful introduction of consumer products and services, consumer research approaches in the two areas should be similar. This report develops and tests various approaches for obtaining consumer input into transportation energy conservation programs.

  13. Energy Storage and Distributed Energy Generation Project, Final Project Report

    SciTech Connect

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  14. Natural resource dependency and decentralized conservation within Kanchenjunga Conservation Area Project, Nepal.

    PubMed

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources.

  15. Natural Resource Dependency and Decentralized Conservation Within Kanchenjunga Conservation Area Project, Nepal

    NASA Astrophysics Data System (ADS)

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources.

  16. Energy conserving site design case study: Shenandoah, Georgia. Final report

    SciTech Connect

    Not Available

    1980-01-01

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as a passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)

  17. Energy Conserving Lifestyles: Final Report to the California Energy Resources Conservation and Development Commission.

    ERIC Educational Resources Information Center

    Schwartz, Seymour I.

    This report examines the broad topic of energy use and its relationship to lifestyles. The emphasis is on three energy conserving lifestyle models: (1) the rural alternative lifestyle; (2) new towns; and (3) energy conserving subdivisions in existing cities. The first chapter presents an introduction. Chapter two examines the back-to-the-land…

  18. Project Final Report: HPC-Colony II

    SciTech Connect

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  19. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  20. LANE COUNTY YOUTH PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    BREWER, EDGAR W.; AND OTHERS

    A GROUP OF LANE COUNTY, OREGON, CITIZENS WHO WERE CONCERNED ABOUT JUVENILE DELINQUENCY BANDED TOGETHER IN 1962 TO ESTABLISH THE LANE COUNTY YOUTH PROJECT (LCYP). THE PRIMARY PURPOSE OF LCYP WAS TO PLAN A MAJOR DEMONSTRATION PROJECT AIMED AT THE PREVENTION AND CONTROL OF DELINQUENCY AND RELATED YOUTH PROBLEMS IN BOTH RURAL AND SMALL CITY SETTINGS.…

  1. [UMOS Child Center Project. Final Report.

    ERIC Educational Resources Information Center

    United Migrant Opportunity Services, Inc., Milwaukee, WI.

    This report presents a description and a brief evaluation of the Child Center Project, a bilingual-bicultural early childhood development program designed to prepare preschool Latino children to succeed in school without losing their bilingual-bicultural identity. Funded by the Office of Child Development, the three-year project was initiated in…

  2. Human Relations Education Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Buffalo Board of Education, NY.

    This project did the planning and pilot phases of an effort to improve the teaching of human relations in grades K-12 of public and private schools in the Buffalo-Niagara Falls metropolitan area. In the pilot phase, the project furnished on-the-job training for approximately 70 schools. The training was given by teams of human relations…

  3. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  4. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  5. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  6. Training for Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Paddock, Susan C.

    Concerned with training local educational agencies in planning and administering community education programs, this report summarizes a year-long project in Arizona, New Mexico, and Colorado. Included are a narrative description of the project and its activities, a list of objectives and agenda subects, assessment, a summary evaluation, and…

  7. Pataha Creek Model Watershed : 1999 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    2000-10-01

    The projects outlined in detail on the attached project reports are a summary of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until last year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream. However, the watershed stream evaluation team used in the watershed analysis determined that there were problems along the Pataha Creek that needed to be addressed that would add further protection to the banks and therefore a further reduction of sedimentation into the stream. 1999 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. In stream work was not addressed this year because of the costs associated with these projects and the low impact of the sediment issue concerning Pataha Creeks impact on Chinook Salmon in the Tucannon River.

  8. NCSU solar energy and conservation house. Final report

    SciTech Connect

    Not Available

    1981-10-01

    A passive solar energy house has been built adjacent to the NCSU McKimmon Continuing Education Center. The house contains a two-story embedded sunspace, two Trombe walls, active solar hot water heating, thermal storage in a rock filled ceiling/floor, and numerous research treatments, and energy conservation features. (See attached photo brochure; Appendix 1). The house is completely decorated and furnished in an attractive manner and the exterior architecture is traditional and has broad consumer appeal. It is also thoroughly instrumented to monitor performance. The house is open to the public on weekends and numerous people come to visit on their own initiative and others take advantage of the close proximity to McKimmon while there attending conferences. The house will influence and motivate large numbers of people to consider solar and energy conservation facets in their homes and will provide data to substantiate performance to prospective home buyers and meaningful data on design and construction for builders.

  9. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  10. Smart Gun Technology project. Final report

    SciTech Connect

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  11. Career Development Outreach Program Exemplary Project. Final Report.

    ERIC Educational Resources Information Center

    Sommer, Sharon L.

    The document is the final report of the career development outreach project. The project was designed to actively involve a systematic program of career education, dissemination of occupational information, and career guidance. The project was to make the target population (students, faculty, and staff at the University of Maine at Farmington and…

  12. Project Kaleidoscope, 1996-2000. Final Report: Executive Summary.

    ERIC Educational Resources Information Center

    George Mason Univ., Fairfax, VA. Helen A. Kellar Inst. for Human disAbilities.

    This final report describes the activities and outcomes of Project Kaleidoscope, a grant funded project designed to develop, field test, and disseminate training materials and methods to prepare personnel to better serve culturally, linguistically and developmentally diverse young children and their families. The project addressed the central…

  13. Project Recurso, 1989-1990. Final Evaluation Report. OREA Report.

    ERIC Educational Resources Information Center

    Rivera, Natasha

    This report presents final (fifth year) results of Project Recurso, a federally funded project which provided 147 Spanish-speaking special education students (grades 3-5) in 12 New York City schools with instruction in English as a Second Language (ESL), Native Language Arts (NLA), and bilingual content area subjects. The project also provided…

  14. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  15. Solar greenhouse project. Final technical report

    SciTech Connect

    Not Available

    1983-06-03

    Three (3) passive solar greenhouses were constructed as lean-to attachment to the homes of three (3) low-income families in Mecklenburg County, North Carolina as a demonstration project. CETA labor was provided by a training and work experience project for home repair and construction skills. Some of the walls were constructed from old salvaged windows and a local block company donated blocks that were used for the foundation. Recipients of the greenhouses reported reduced air drafts and fuel consumption savings. Flowers and vegetables were successfully grown during the winter months.

  16. Trucking Industry Training Project. Final Report.

    ERIC Educational Resources Information Center

    Sanburn, Donald D.

    The report was prepared under a grant made to investigate the possibilities of establishing an organized system of training for the trucking industry. It discusses attempts to disseminate information on training, learned through operation of an experimental and demonstration project in Pico Rivera, California. It discusses problems of compliance…

  17. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  18. Southeast geysers effluent pipeline project. Final report

    SciTech Connect

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

  19. Occupational Competence Access Project. Final Report.

    ERIC Educational Resources Information Center

    Post, John O., Jr.

    The Occupational Competence Access Project (OCAP) was conducted to facilitate student access to (1) occupational opportunities through the provision of a guidance system incorporating student capabilities; (2) occupational opportunities through the provision of industrially validated exploratory programs in occupational preparation; and (3)…

  20. NORCAL Project: Phase I. Final Report.

    ERIC Educational Resources Information Center

    MacMillan, Thomas F.

    Phase I of Northern California Cooperative Research Project on Student Withdrawals (NORCAL) examined withdrawal and continuing students in 23 colleges, evaluated the data, predicted potential withdrawals, and summarized findings. A questionnaire was used to help develop a model to predict attrition within the first term of enrollment. The junior…

  1. Hartford Labor Mobility Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Public Welfare, Hartford.

    The project was an effort to relocate unemployed and underemployed persons, predominantly Negroes and Puerto Ricans, from the ghetto to the suburbs to learn whether job finding assistance, counseling and relocation could enable families with an able-bodied wage earner to get off welfare rolls. (NTIS)

  2. Yaqui Parent Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    de Campoy, Antonia

    The Yaqui Parent Education Demonstration Project was founded in 1975 with the aid of Maricopa County Head Start in Guadalupe, Arizona, to help foster the continuation of the Yaqui language, history, and culture. With a 1-year grant from the Department of Health, Education, and Welfare/Office of Child Development, organizers hired a coordinator,…

  3. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  4. The Sesame Mother Project. Final Report.

    ERIC Educational Resources Information Center

    Filep, Robert T.; And Others

    The main objective of the Sesame Mother Pilot Project was to increase the effectiveness of the television program with preschool children in densely populated, low-income, inner-city areas. Volunteer Mothers selected from the inner-city areas of Los Angeles and Chicago were trained to conduct viewing sessions in their own homes. Following the…

  5. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  6. Workplace Skills Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Seattle-King County Private Industry Council, Seattle, WA.

    The Workplace Skills Enhancement Project was provided by the Seattle-King County Private Industry Council in Partnership with the Employment Opportunities Center and the Refugee Federation Service Center. Of the 150 participants in the program, 137 were Asian. Workplace literacy training was generally advertised as a voluntary program available to…

  7. Automated metadata--final project report

    SciTech Connect

    Schissel, David

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  8. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  9. Labor Exchange Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Dietrich, Eleanor; Hendrickson-Larson, Joanna; Hoppe, Ruth; Paige, Bruce; Rosenow, Steve

    The Labor Exchange Skills Project, which was conducted under the sponsorship and direction of the U.S. Department of Labor, Employment and Training Administration, was designed to develop a labor exchange skills database (ETA) that would improve the usability of many Department of Labor applications and products developed by other public and…

  10. Project Step Ahead. Final Performance Report.

    ERIC Educational Resources Information Center

    New Mexico State Univ., Las Cruces. Dept. of English.

    This report describes a National Workplace Literacy Demonstration project that provided onsite training at participating New Mexico hospitals in job-specific literacy skills necessary for satisfactory job performance. Six courses were offered that integrated language skills with reading, writing, and speaking components--Straight Talk:…

  11. Mobilizing Adult Basic Education. Final Project Report.

    ERIC Educational Resources Information Center

    Fausto, Vincent J.

    An adult basic education (ABE) project was undertaken in 1977 in southern New Jersey to take instruction to students in rural areas. The region was one in which some 75% of the population had not completed high school. Centered in Millville with satellite centers in four rural townships whose secondary students are bussed to Millville, the project…

  12. Vermont gasifier project. Final report, Phase I

    SciTech Connect

    1995-07-01

    This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

  13. The MARC Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Avram, Henriette D.

    The MARC Pilot Project was an experiment conducted by the Library of Congress, in cooperation with 16 participating libraries, to determine the feasibility of putting cataloging data into machine-readable from for distribution of magnetic tapes. MARC (Machine Readable Cataloging) records were distributed for some 16,000 titles in the pilot phase…

  14. Emergency Medical Services. Final Project Report.

    ERIC Educational Resources Information Center

    Huff, Hugh; Caltagirone, Norma

    This report presents the procedures and activities of a year-long Public Education Project conducted in Region J of North Carolina to help citizens of this region learn what Emergency Medical Services (EMS) are available, how to obtain them, and when to call upon them. Previous reports provide the sampling methodology used to survey the…

  15. Sociology of the Classroom Project. Final Report.

    ERIC Educational Resources Information Center

    Gold, Raymond L.

    This project formed small seminar groups of behavioral scientists and educators to study the sociology of the classroom. The groups observed classrooms in elementary schools, high schools, and universities in Montana. Library research and discussion were other methods of investigation used. It was concluded that the classroom is part of society's…

  16. Energy and Water Conservation Curriculum Development in Irrigation Technology for the Pacific Northwest. Final Report.

    ERIC Educational Resources Information Center

    Peterson, James R.

    This project was conducted to develop curriculum materials for classes in energy and water conservation for the Irrigation Technology Program at Walla Walla Community College. To develop the curriculum, the principal investigator read and analyzed materials on the subjects of water and energy conservation, participated in a short course on drip…

  17. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  18. Monitoring conservative retrofits in single family buildings. Final technical report

    SciTech Connect

    Richardson, C.S.

    1992-12-06

    This study has provided detailed before-and-after information on the ambient and comfort conditions in nine single family buildings, and on the energy consumption of those buildings, for one or more energy conservation retrofits. The data were recorded in such a manner that as well as being able to determine the savings from the retrofits and the influence these retrofits have on the comfort conditions of the residence, the effects of the retrofits on time-of-day usage are also determinable. The following are included in appendices: a table of participant`s names, site addresses and retrofit; significant dates and appropriate comments; a day of data and an annotated data set; pre-retrofit and post-retrofit audit data sheets; and usage history.

  19. Institutional conservation program: Energy use data base demonstration: Final report

    SciTech Connect

    Not Available

    1987-04-01

    An attempt was made to motivate implementation of energy accounting programs in seven states. None of the seven states initiated a systematic statewide accounting program. The principal reason was lack of personnel. The project strategy was reformed to disseminate information to all states and territories and to other interested organizations. Recipients of the reports greeted them positively and expressed interest in energy accounting. However, there is no evidence that any state or local government instituted an energy accounting program because of the reports. The project was again reformed to attempt to demonstrate the initiation of an energy accounting service. Prison inmates who were students in computer classes could provide data processing and handling. Officials in New York State explored the possibility of starting, at Attica Correctional Facility, an energy accounting service to serve public buildings in New York.

  20. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents` energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today`s results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  1. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents' energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today's results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  2. I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft

    SciTech Connect

    1980-05-30

    The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

  3. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  4. Final performance report for Project JEM

    SciTech Connect

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  5. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  6. Confined zone dispersion project. Final technical report

    SciTech Connect

    1994-06-01

    This report describes the performance of the confined zone dispersion (CZD) flue gas desulfurization (FGD) system in removing sulfur dioxide (SO{sub 2}) from flue gas in the coal-fired boiler. The CZD-FGD system, installed at Pennsylvania Electric Company`s (Penelec`s) Seward Power Station, was designed to remove 50% of the SO{sub 2} from one-half of Unit No. 5`s flue gas when the boiler is fired with 1.5% sulfur coal. Section 1 discusses the significance of CZD, the purpose of this report, the history of the project, and the role of DOE in the project, describes the project organization, and lists the six design areas involving proprietary information. Section 2 presents project location, objectives, and phases, and discusses the test program. Section 3 explains the process flow diagram, piping and instrumentation diagrams and operating controls, site plan, equipment layouts, and process equipment. Section 4 provides an integrated discussion of all the test results obtained during the test program, backed by tabulations and graphics. Section 5 describes the testing failures and corrective actions taken. Section 6, reliability/availability/maintainability analysis data of major equipment, covers the following systems: atomizing, sootblowing, lime, flue gas, and controls and instrumentation. Section 7 summarizes the capital cost requirements for the Seward CZD demonstration unit and discusses the capital and operating costs of installing the process at plants with various unit capacities. Section 8 discusses plans to continue the CZD demonstration to achieve longer term continuous operation at SO{sub 2} removals of 50%. Section 9 presents the principal findings of the CZD demonstration and recommends additional testing.

  7. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  8. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  9. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  10. Project AIRSTREAM: Trace gas final report

    SciTech Connect

    Leifer, R

    1992-12-01

    The results of 10 years of sampling for trace gases in the upper troposphere and lower stratosphere are presented. These samples were collected under the auspices of the Atomic Energy Commission (AEC), the Energy Research and Development Administration (ERDA) and the Department of Energy (DOE). Almost 1000 whole air samples were collected during the years 1973 to 1983 under Project AIRSTREAM. Project AIRSTREAM was part of the Environmental Measurements Laboratory's (EML, at that time called the Health and Safety Laboratory/HASL) research effort to investigate the impact of the injection of radionuclides and stable compounds into the stratosphere. One or more of the following compounds were analyzed: CCl[sub 3]F, CCl[sub 2]F[sub 2], CCl[sub 4], N[sub 2]O, SF[sub 6], CO[sub 2], CH[sub 4], CH[sub 3]CCl[sub 3], and COS. Details of the Project's quality assurance program are discussed. Also included in the report are two-dimensional plots of the concentration of CCl[sub 3]F and a complete tabulation of the data.

  11. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  12. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  13. Effects of a coordinated farmland bird conservation project on farmers' intentions to implement nature conservation practices - Evidence from the Swedish Volunteer & Farmer Alliance.

    PubMed

    Josefsson, Jonas; Lokhorst, Anne Marike; Pärt, Tomas; Berg, Åke; Eggers, Sönke

    2017-02-01

    To increase the efficacy of agri-environmental schemes (AES), as well as farmers' environmental engagement, practitioners are increasingly turning to collective forms of agri-environmental management. As yet, empirical evidence from such approaches is relatively scarce. Here, we examined a farmland bird conservation project coordinated by BirdLife Sweden, the Swedish Volunteer & Farmer Alliance (SVFA). The key features of the SVFA were farmland bird inventories from volunteering birdwatchers and on-farm visits to individual farmers from conservation advisors for guidance on AES as well as unsubsidised practices. Using an ex-post application of the theory of planned behaviour across project participants and a randomly sampled control group of farmers we assessed how SVFA affected behavioural intentions relating to AES and unsubsidised conservation, and how the behaviour was affected by attitudes, perceived social norms and perceived behavioural control. We also included a measure of self-identity as a conservationist to assess its importance for behavioural intentions, and if SVFA stimulated this self-identity. SVFA farmers reported greater commitment to implementing AES and unsubsidised conservation, as compared to the control group. However, greater commitment was associated with more positive attitudes for unsubsidised conservation only and not for AES, underlining the inability of existing AES to prompt intrinsic motivation. There were also differences between farmers within SVFA, where farmers applying to the project were motivated by social influences, while farmers recruited by project managers were motivated by their personal beliefs regarding nature conservation. Finally, farmers' self-perceived ability to perform practices (i.e. perceived behavioural control) was important for their commitment to implementing AES as well as unsubsidised practices. Therefore, increasing farmers' awareness regarding the availability and, not least, practicability of

  14. Shrimp monitor/locator for conservation of fuel. Final report

    SciTech Connect

    Not Available

    1980-01-01

    A demonstration project of a new type Shrimp Detector/Monitor has been completed. The test project proved the efficiency of the Shrimp Monitor/Detector in detecting shrimp, in identifying the number and size, in real time, but indicated that improvement could be effected which would enhance the operation. Data obtained from the test cruises indicate significant savings in diesel fuel will occur for those trawlers using the Shrimp Monitor/Detector in place of the usual trynet operation; 25% savings for the series model number 400, (the prototype tested) and expected 35%+ if the advanced series model number 500 were used. Fabrication and operational costs for the Shrimp Monitor/Detector are reasonable and well within the financial abilities of the usual large offshore trawler. Research and testing during this program resulted in the design of an advanced model incorporating significant improvements, and fabrication was commenced but the extra cost involved beyond the set value of this contract made the further experiments non-viable. Recommendations have been submitted for an extended program to fabricate and test the advanced model series number 500 which may be of more value and interest, market use, to the operating offshore shrimp trawlers. A marketing/sales program will be instituted to place the Shrimp Monitor/Detector in the commercial area serving the shrimp fleet.

  15. Final Project Report Project 10749-4.2.2.1 2007-2009

    SciTech Connect

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  16. Combined Final Report for Colony II Project

    SciTech Connect

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  17. Society of Mind project. Final report

    SciTech Connect

    Minsky, M.

    1988-08-01

    This project was concerned with developing a theory of intelligent thinking and learning, based on the Society of Mind model of intelligence. The research was funded over a period of years by the Computer Science Office of the Office of Naval Research. The research included the following specific subjects: Connectionism of Parallel Computers, Exploiting Parallel Processing, Connectedness of Commonsense Knowledge Bases, Connectedness and Society of Mind, Advantages and Deficiencies of Connectionist Networks, Insulation and Interaction, Learning and Representation, Intermediate Units and Significance, Associations and Connections, Unifying Frames and K-lines, Clarifying Conceptual Dependency, Computational linguistics, Research tools for society of mind models, Discovery processes, and Bridges between symbolic and connectionist models.

  18. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  19. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  20. Raft River aquaculture project. Final report

    SciTech Connect

    Beleau, M.H.; Woiwode, J.G.

    1980-07-01

    The commercial potential for geothermal aquaculture was evaluated for 2 years at the Department of Energy's Raft River geothermal site in southcentral Idaho. Common carp '(Cyprinus carpio) and channel catfish (Ictalurus punctatus) were selected as culture species. Objectives of the study included investigation of: (1) growth rates; (2) nutrition trials; (3) histological and physiological parameters; (4) bioaccumulation of heavy metals; and (5) reproductive capacity. The second year project efforts were primarily studying the effects of geothermal water on the reproductive capacity of common carp by: (1) determining the effects of geothermal water on gonadal development of common carp; and (2) determining the effects of geothermal water on common carp embryogenesis.

  1. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  2. Final Report. Montpelier District Energy Project

    SciTech Connect

    Baker, Jessie; Motyka, Kurt; Aja, Joe; Garabedian, Harold T.

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  3. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  4. Biorefinery Demonstration Project Final Progress Report

    SciTech Connect

    Lee, David

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  5. Solar Total Energy Project final test report

    SciTech Connect

    Nelson, R.F.; Abney, L.O.; Towner, M.L. )

    1990-09-01

    The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report. 9 refs., 19 figs., 7 tabs.

  6. Blade Manufacturing Improvement Project: Final Report

    SciTech Connect

    SHERWOOD, KENT

    2002-10-01

    The Blade Manufacturing Improvement Project explores new, unique and improved materials integrated with innovative manufacturing techniques that promise substantial economic enhancements for the fabrication of wind turbine blades. The primary objectives promote the development of advanced wind turbine blade manufacturing in ways that lower blade costs, cut rotor weight, reduce turbine maintenance costs, improve overall turbine quality and increase ongoing production reliability. Foam Matrix (FMI) has developed a wind turbine blade with an engineered foam core, incorporating advanced composite materials and using Resin Transfer Molding (RTM) processes to form a monolithic blade structure incorporating a single molding tool. Patented techniques are employed to increase blade load bearing capability and insure the uniform quality of the manufactured blade. In production quantities, FMI manufacturing innovations may return a sizable per blade cost reduction when compared to the cost of producing comparable blades with conventional methods.

  7. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  8. Physics of Correlated Systems, Final Project Report

    SciTech Connect

    Greene, Chris H.

    2014-06-25

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  9. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  10. Teacher Education Improvement Project 1985-1986. Final Project Report.

    ERIC Educational Resources Information Center

    Grambling State Univ., LA. Coll. of Education.

    The purpose of the Teacher Education Improvement Project at Grambling State University (Louisiana) was to document the change processes and products the institution used to improve performance of prospective teachers. The intent was to validate the effectiveness of planned programs of change in five areas: student assessment; faculty development;…

  11. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  12. Wastewater Triad Project: Final Summary Report

    SciTech Connect

    Walker, J.F.

    2001-12-27

    the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and Land Disposal Restrictions (LDR) regulations; and (5) deploy state-of-the art technologies that have applications across the DOE complex. Partnerships were developed with DOE technology development agencies, private-sector companies, and other DOE sites to accomplish implementation of these technologies.

  13. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and

  14. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  15. The Indiana Deaf-Blind Services Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Goehl, Karen S.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 3-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through age 2 and ages 18 through 21. It also was designed to provide technical assistance to public and private agencies…

  16. Latin American Literacy Partnership Project. Final Formative Evaluation.

    ERIC Educational Resources Information Center

    Watt, David L. E.

    This final evaluation of the 1991-92 program year of the Latin American literacy Project, designed to foster English language literacy in Spanish-speaking families in Canada, is intended as a formative report, American Literacy Project is intended as a formative report, assessing the changes in the students' language proficiency and the progress…

  17. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  18. Assessment and Improvement of Related Services (AIRS) Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Robert A.; Hirata, Glenn T.

    The document presents the final report of the Assessment and Improvement of Related Services (AIRS) Project, an effort to assess the impact and effectiveness of special education related services in Hawaii. Each of the four project objectives focused on accomplishment of one of the evaluation types specified in the Context-Input-Process-Product…

  19. Helical Screw Expander Evaluation Project. Final report

    SciTech Connect

    McKay, R.

    1982-03-01

    A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

  20. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  1. Aerogel commercialization pilot project. Final program report

    SciTech Connect

    1996-02-13

    Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

  2. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  3. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  4. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  5. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  6. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  7. HIP densification project. Final CRADA report

    SciTech Connect

    Franco-Ferreira, E.A.; Finkelstein, W.

    1997-08-29

    An investigation was conducted to evaluate the use of HIPed aluminum castings as near-net-shape blanks for large electrostatic focusing electrodes in ion lithography machines. The electrodes must have very smooth finishes which are free of pores and other defects. This has heretofore been achieved by rough-machining the blanks out of large forged aluminum billets and final diamond-turning. The use of a near-net-shape casting for the blank was expected to save a significant amount of money and time. The test was conducted on a single cast blank which was supplied by the Partner in the HIPed and stress relieved condition. Rough machining and diamond turning operations conducted by LMES/ER revealed that the casting contained unacceptably large defects. The conclusion was reached that HIPed aluminum castings in the large sizes and of the quality levels required would probably be unobtainable in a cost-effective manner. An alternative approach, using ring forgings assembled by electron beam welding was proposed and investigated by LMES/ER. Although an electrode blank was not obtained, the study indicated that this approach would be successful and cost-effective.

  8. Meager Creek geothermal project: Final report

    SciTech Connect

    Stauder, J.; Hunt, J. W.

    1987-04-01

    A fracture-dominated geothermal resource with temperatures in excess of 195/sup 0/C (383/sup 0/F) has been identified in the south reservoir area of the Meager Creek Project, 200 km north of Vancouver in British Columbia, Canada Geothermal fluids were intersected in each of three deep exploratory wells drilled in 1981 and 1982. Low flow rates indicated low permeability of the producing zones tested in the wells. A steam generator and a 20-kWe steam turbine-generator module were installed at well MC-1 and were operated during a 6-month period. The liquid flowrate at the wellhead was approximately 57,000 pounds per hour (26 tonnes/hour or 7.2 kg/sec) with a surface temperature of 125/sup 0/C (257/sup 0/F). Turbine performance was measured at 32 to 37 psia (220 to 255 kPa) inlet steam pressure, with exhaust to the atmosphere at 13 psia (90 kPa). B.C. Hydro's downwell temperature measurements and geochemical thermometry analyses are presented, along with results from the turbine testing. Results indicate a production zone at about 1600 m (5300 ft.) with a temperature of 195/sup 0/C (383/sup 0/F), an unproduced zone below 3000 m (10,000 ft.) with temperature approximately 240/sup 0/C (460/sup 0/F), and steam turbine performance measured at 60% of the isentropic efficiency and interpreted to be equivalent to achieving about 75% efficiency with a 20-kWe steam turbine optimized for the service.

  9. Innovative subsurface stabilization project -- Final Report

    SciTech Connect

    Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

    1996-11-01

    This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

  10. Energy Conservation Projects to Benefit the Railroad Industry

    SciTech Connect

    Clifford Mirman; Promod Vohra

    2009-12-31

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. The team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction

  11. South Burlington Vermont Career Education Project. Final Financial Status Report and Project Performance Report; Final Evaluation Report, Final Report, January 30, 1979 through June 30, 1979.

    ERIC Educational Resources Information Center

    South Burlington School District, VT.

    This document contains the (1) final status report and project performance report and (2) final evaluation report of a career education project to develop a demonstration model to train school personnel to infuse career education into the curriculum. The first report outlines objectives and major activities involving parents, higher education, and…

  12. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  13. Real world financing opportunities for energy conservation projects

    SciTech Connect

    Tramonte, D.J.

    1988-01-01

    Do you have the resources, dollars, people expertise and general know-how to do all the energy conservation measures. If you have the funds, do it yourself. Historically you would save more if you hired a private concern because that is the only job the contractor does for you. You have other hats to wear and fires to put out. Using third-party financing can be a good decision based on your specific needs. Procrastination is not the answer - the cost of delay is extensive. Financing energy conservation measures is no different from financing your automobile or home. If the benefits outweigh the negatives, the answer is obvious. Remember, in any case of using private sector financing, your are joining a partnership arrangement. The only way to succeed is to be honest with each other on the front end. There need not be any surprises. Any reputable company will gladly have your attorney evaluate all agreements, amortization schedules, and attachments. Real world financing alternatives will continue to change as the market matures. It's not too good to be true. It is no more than a vehicle to make the efforts of capital improvements streamlined. The money or financing is the catalyst to the project and makes the other areas meld.

  14. Progress and implications from the grazing lands Conservation Effects Assessment Project (CEAP) literature syntheses

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) is a multiagency effort to quantify scientifically the environmental outcomes of conservation practices used by private landowners. Two syntheses of the scientific literature are underway, which will document the environmental outcomes of conservati...

  15. The Conservation Effects Assessment Project (CEAP): The U.S. experience in determining a national scale natural resource and conservation needs assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) was initiated to establish a scientific understanding of the impacts of agricultural conservation practices at the watershed scale, to quantify agricultural conservation practice benefits at the national and regional scales, and to identify outstand...

  16. Petascale Computing Enabling Technologies Project Final Report

    SciTech Connect

    de Supinski, B R

    2010-02-14

    The Petascale Computing Enabling Technologies (PCET) project addressed challenges arising from current trends in computer architecture that will lead to large-scale systems with many more nodes, each of which uses multicore chips. These factors will soon lead to systems that have over one million processors. Also, the use of multicore chips will lead to less memory and less memory bandwidth per core. We need fundamentally new algorithmic approaches to cope with these memory constraints and the huge number of processors. Further, correct, efficient code development is difficult even with the number of processors in current systems; more processors will only make it harder. The goal of PCET was to overcome these challenges by developing the computer science and mathematical underpinnings needed to realize the full potential of our future large-scale systems. Our research results will significantly increase the scientific output obtained from LLNL large-scale computing resources by improving application scientist productivity and system utilization. Our successes include scalable mathematical algorithms that adapt to these emerging architecture trends and through code correctness and performance methodologies that automate critical aspects of application development as well as the foundations for application-level fault tolerance techniques. PCET's scope encompassed several research thrusts in computer science and mathematics: code correctness and performance methodologies, scalable mathematics algorithms appropriate for multicore systems, and application-level fault tolerance techniques. Due to funding limitations, we focused primarily on the first three thrusts although our work also lays the foundation for the needed advances in fault tolerance. In the area of scalable mathematics algorithms, our preliminary work established that OpenMP performance of the AMG linear solver benchmark and important individual kernels on Atlas did not match the predictions of our

  17. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  18. Tritium research laboratory cleanup and transition project final report

    SciTech Connect

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  19. Salt River Project`s participation in Arizona`s bald eagle conservation efforts

    SciTech Connect

    Nobel, T.A.

    1996-11-01

    Bald eagle (Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP`s participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies. 7 refs., 4 figs.

  20. Discussion on the application of 3S technology in soil and water conservation project

    NASA Astrophysics Data System (ADS)

    Qin, Fen; Hu, Sujie; Wang, Yanan; Tang, Fuping

    2007-06-01

    Soil and water conservation project in the loess plateau of China is focus on improving its feasibility with new technology. This paper discussed on the application of "3S" technology in a soil and water conservation project of selected small watershed of Jingjiahe, Loess plateau. The research presents an approach to apply RUSLE to quantify soil and water loss by the help of "3S" technology, the suitability evaluation for each piece of land is implemented with the assessment indices. Finally, according to the nature condition and economic development trend, by accomplishing the analysis of the comprehensive control benefits for the small watershed, establishing rational land use pattern. Through five years construction of soil and water conservation, the controlling soil erosion area up to 2369.98 hectares, harnessed degree reaches 80.66%, the per capita net income will float up from yen 944.72 to yen 1049.75, the annual preserved area of endangered soil will be 90,000t with the efficiency increased by more than 22%, eventually the soil and water loss shall be well under control. This indicates that "3S" technology make the work more cost-effective, more efficient and more reliable taking into account the precise data which are processed in the planning.

  1. Legacy sample disposition project. Volume 2: Final report

    SciTech Connect

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.

  2. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Energy Regulatory Commission Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and...

  3. The Conservation Effects Assessment Project (CEAP): a national scale natural resources and conservation needs assessment and decision support tool

    NASA Astrophysics Data System (ADS)

    Johnson, M.-V. V.; Norfleet, M. L.; Atwood, J. D.; Behrman, K. D.; Kiniry, J. R.; Arnold, J. G.; White, M. J.; Williams, J.

    2015-07-01

    The Conservation Effects Assessment Project (CEAP) was initiated to quantify the impacts of agricultural conservation practices at the watershed, regional, and national scales across the United States. Representative cropland acres in all major U.S. watersheds were surveyed in 2003-2006 as part of the seminal CEAP Cropland National Assessment. Two process-based models, the Agricultural Policy Environmental eXtender(APEX) and the Soil Water Assessment Tool (SWAT), were applied to the survey data to provide a quantitative assessment of current conservation practice impacts, establish a benchmark against which future conservation trends and efforts could be measured, and identify outstanding conservation concerns. The flexibility of these models and the unprecedented amount of data on current conservation practices across the country enabled Cropland CEAP to meet its Congressional mandate of quantifying the value of current conservation practices. It also enabled scientifically grounded exploration of a variety of conservation scenarios, empowering CEAP to not only inform on past successes and additional needs, but to also provide a decision support tool to help guide future policy development and conservation practice decision making. The CEAP effort will repeat the national survey in 2015-2016, enabling CEAP to provide analyses of emergent conservation trends, outstanding needs, and potential costs and benefits of pursuing various treatment scenarios for all agricultural watersheds across the United States.

  4. The Skills Enhancement Literacy Project of Hawaii. Final Program Model. Final Performance Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Coll. of Education.

    The Skills Enhancement Literacy Project of Hawaii (SELPH) was a demonstration workplace literacy partnership between the College of Education, University of Hawaii-Manoa and the ITT Sheraton Hotels. Four Sheraton Hotels in Waikiki participated in the project. The program was planned, staff and volunteers were recruited, and marketing strategies…

  5. Evaluation of the State Energy Conservation Program from program initiation to September 1978. Final report

    SciTech Connect

    Heller, James N.; Grossmann, John R.; Shochet, Susan; Bresler, Joel; Duggan, Noreene

    1980-03-01

    The State Energy Conservation Program was established in 1975 to promote energy conservation and to help states develop and implement their own conservation programs. Base (5) and supplemental (3) programs required states to implement programs including: mandatory thermal-efficiency standards and insulation requirements for new and renovated buildings; mandatory lighting efficiency standards for public buildings; mandatory standards and policies affecting the procurement practices of the state and its political subdivisions; program measures to promote the availability and use of carpools, vanpools, and public transportation; a traffic law or regulation which permits a right turn-on-red; and procedures to carry out a continuing public education effort to increase awareness of energy conservation; procedures which promote effective coordination among local, state, and Federal energy conservation programs; and procedures for carrying out energy audits on buildings and industrial plants. All 50 states and Puerto Rico, Guam, the Virgin Islands, American Samoa, and the District of Columbia participated in the program. The total 1980 energy savings projected by the states is about 5.9 quadrillion Btu's or about 7% of the DOE projected 1980 baseline consumption of just under 83 quads. The detailed summary is presented on the following: information the SECP evaluation; DOE response to the SECP; DOE's role in the program management process; the effectiveness of the states in managing the SECP; the status of program measure implementation; innovative state energy conservation programs; and the evaluation methodology.

  6. The Management of Building Environment for Comfort and Energy Conservation. Final Report.

    ERIC Educational Resources Information Center

    North Seattle Community Coll., WA.

    This report presents materials from a Washington State project to develop a curriculum outline of three courses for energy conservation to be used in vocational supplement classes. It first presents results from an industrial survey on which engineers, architects, and mechanical contractors rated objectives for the three courses. Next are provided…

  7. 77 FR 2992 - Columbia National Wildlife Refuge, Adams and Grant Counties, WA; Final Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Columbia National Wildlife Refuge, Adams and Grant Counties, WA; Final Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment AGENCY:...

  8. 75 FR 9924 - Final Comprehensive Conservation Plan for the Red Rock Lakes National Wildlife Refuge, MT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... elk, mule and white-tailed deer, badger, coyote, and red fox. In addition, wolves and grizzly bears... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Red Rock Lakes National... Plan (Plan) and finding of no significant impact (FONSI) for the Red Rock Lakes National...

  9. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment AGENCY: Fish and...

  10. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  11. Sustaining Jamaica's forests: The protected areas resource conservation project

    NASA Astrophysics Data System (ADS)

    Berke, Philip R.; Beatley, Timothy

    1995-07-01

    This study examines Jamaica's attempt to protect a tropical forest reserve. The biophysical setting, and the types and magnitude of forest development pressures are reviewed. Next, Jamaica's approach to developing new land-use strategies and compatible environmental protection and economic development programs are examined. Finally, the practical and theoretical implications by which institutions can be designed to encourage planning for sustainable development are reviewed. The implications suggest how to provide an appropriate mix of cooperation and market competition, by which people acting in their own interests accomplish socially equitable economic development, while protecting the environment for the benefit of future generations. The experience illustrates that effective long-term protection of natural areas requires the building of local relationships and support, the development of local economic activities supportive of conservation, the defining of clear boundaries, and significant monitoring and enforcement. Long-term protection of the Blue and John Crow mountains, and other important natural areas of Jamaica, will also require the development of a workable and enforceable system of land-use planning for the island, and adjustments to the economic incentive structure so that sustainable, nonextractive uses of natural capital are placed on equal footing with other economic uses (e.g., coffee production).

  12. Installation-wide energy-conservation demonstration at Fort McClellan, Alabama. Final report

    SciTech Connect

    Windingland, L.M.; Lilly, B.P.; Shonder, J.A.; Underwood, D.M.; Augustine, L.J.

    1988-11-01

    The objective of the installation-wide energy conservation demonstration at Fort McClellan, AL, was to evaluate the effectiveness of applying available energy-conservation technologies and techniques to produce significant and predictable reductions in energy use and cost. Five major areas of energy conservation were identified and investigated: (1) pressure reduction in district-steam-heating systems; (2) reduction of outdoor air in heating, ventilation, and air-conditioning (HVAC) systems; (3) replacement of oversized and inefficient motors in HVAC systems; (4) reduction of outdoor air infiltration in family housing; and (5) combustion optimization of gas-fired heating equipment. Other areas of investigation included radio-controlled exterior lighting, and temperature reduction in the high-temperature hot-water system. Each conservation project was evaluated on a small scale to verify energy savings before it was implemented. An energy-information management system was developed to maintain annual consumption data for each building. The system provides immediate feedback on energy use so managers can make correct decisions on conservation measures. The energy conservation programs implemented at Fort McClellan contributed to the 14% reduction in baseline (weather independent) energy consumption from FY84 to FY86. These programs have wide applicability to other U.S. Army installations. This research has also shown the importance of preliminary, small-scale testing of energy-conservation programs before implementation.

  13. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Guidelines and standards for museum conservation... REGULATIONS Museum Conservation Program § 1180.70 Guidelines and standards for museum conservation projects. (a) Scope. The guidelines and standards in this subpart apply to all aspects of the IMLS...

  14. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Guidelines and standards for museum conservation... REGULATIONS Museum Conservation Program § 1180.70 Guidelines and standards for museum conservation projects. (a) Scope. The guidelines and standards in this subpart apply to all aspects of the IMLS...

  15. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Conservation Advisory Group; Yakima River Basin Water Enhancement Project, Yakima, WA AGENCY: Bureau of... Committee Act, the Yakima River Basin Conservation Advisory Group, Yakima River Basin Water Enhancement... River Basin Water Conservation Program. DATES: The meeting will be held on Tuesday, August 21,...

  16. Energy Conservation Field Projects. Phase 2: External Evaluation. Document II: Appendices.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Provided are appendices which contain supporting documentation related to an external evaluation of the Phase 2: Energy Conservation Field Projects. Objectives of this program were to: test the generalizability of the energy conservations measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these…

  17. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Guidelines and standards for museum conservation... REGULATIONS Museum Conservation Program § 1180.70 Guidelines and standards for museum conservation projects. (a) Scope. The guidelines and standards in this subpart apply to all aspects of the IMLS...

  18. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  19. The Pittsburgh Science Technology Society Project: A Final Report.

    ERIC Educational Resources Information Center

    O'Brien, George E., Ed.

    This final report on the inservice education of secondary science teachers for the teaching of science via Science Technology Society (STS) materials lists the major objectives of the project as: (1) write four instructional modules with a science, society and technology focus which address special concerns and needs of the underserved and…

  20. El Camino College Basic Skills for Quality Project. Final Report.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    This is the final report of a cooperative basic skills and literacy project of El Camino College (California) and two companies, BP Chemicals/Hitco Inc. and a division of the Hughes Aircraft Company. An extension of an earlier workplace program with BP chemicals, the program provided basic mathematics, reading, and English-as-a-Second-Language…

  1. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  2. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  3. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  4. The Texas Childhood Hunger Identification Project. Final Report.

    ERIC Educational Resources Information Center

    Center for the Public Policy Priorities, Austin, TX.

    The final report of the Texas Childhood Hunger Identification Project (Texas CHIP), this document describes the most comprehensive study of childhood hunger undertaken in Texas. Through enumeration and interviewing methods, low-income families from 27 counties in Texas were analyzed in the areas of income allocation, food frequency, homelessness,…

  5. Learning in Science Project (Form 1-4). Final Report.

    ERIC Educational Resources Information Center

    Waikato Univ., Hamilton (New Zealand).

    The Learning in Science Project investigated teaching and learning in science at the Form 1 to 4 level to identify some of the key difficulties in this subject area and to find ways of overcoming such difficulties. Included in this final report are: (1) brief accounts of the three major phases of the research; (2) a list of papers derived from the…

  6. ECP (Environmental Conservation Project) Report, No. 8, December 1976. ECP State Bibliography.

    ERIC Educational Resources Information Center

    Dean, Norman L., Ed.

    This issue of the Environmental Conservation Project (ECP) Report contains the second supplement to the "ECP State Bibliography," a collection of state energy legislation compiled by the Energy Conservation Project at the Environmental Law Institute. Earlier publications of state legislative actions appear in the October 1975 and January 1976…

  7. Admiralty Inlet Pilot Tidal Project Final Technical Report

    SciTech Connect

    Collar, Craig

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  8. [Discussion on water conservancy projects and schistosomiasis control in Poyang Lake area].

    PubMed

    Liu, Dao-Nan

    2013-02-01

    According to the schistosomiasis endemic situation in the Poyang Lake area, this paper analyzes the relationship between the water conservancy projects and schistosomiasis control, and reviews and discusses the effects of the Water Level Control Project of Poyang Lake, the Lake Dike Slope Hardening Project, and the Lifting Delta and Descending Beach Project on Oncomelania snail control.

  9. Conservation and development projects in the Brazilian Amazon: lessons from the Community Initiative Program in Rondônia.

    PubMed

    Browder, John O

    2002-06-01

    Community-based conservation and development has become the prevailing programmatic paradigm of conservation organizations and development donors over the last 20 years, spawning a myriad of integrated conservation and development projects (ICDP) around the world. Appealing for its ambitious aspiration to harmonize sustainable economic development at the local level with the conservation of legally established protected areas (e.g., parks and reserves), the ICDP approach recently has drawn criticism from conservation biologists for failing to ensure adequate protection of biodiversity. Development planners and economists have also raised questions about the financial sustainability of ICDPs in practice and the replicability of the model from highly local contexts to larger regional scales. This paper briefly reviews the central elements of the concept of integrated conservation and development and the emerging debate over its effectiveness. A description of the Community Initiative Program (CIP), a pilot program of the Rondônia Natural Resources Management project (PLANAFLORO) in the western Brazilian Amazon state of Rondônia, follows. The CIP is a significant experiment because it boldly attempted to apply the principles of ICDP to the regional scale involving numerous different communities in one program simultaneously. Based on the author's mid-term review of the CIP in 1999, the development and conservation impacts of the program are considered. While the CIP has not significantly curbed the degradation of protected areas in Rondônia as intended, the evidence suggests lower rates of deforestation in municipios (i.e. counties) with the highest concentrations of CIP projects. Although the economic development impacts are mixed, approximately 50% of the projects delivered tangible benefits to local communities. Lessons learned from the CIP are presented in the final section. Among the lessons learned from the CIP, detailed in the final section, are several that

  10. The Midlands Consortium Star Schools Project: Final Report, Final Evaluation Report, Final Evaluation Report Appendices.

    ERIC Educational Resources Information Center

    Midlands Consortium.

    The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…

  11. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  12. Quantitative assessment of a Tanzanian integrated conservation and development project involving butterfly farming.

    PubMed

    Morgan-Brown, Theron; Jacobson, Susan K; Wald, Kenneth; Child, Brian

    2010-04-01

    Scientific understanding of the role of development in conservation has been hindered by the quality of evaluations of integrated conservation and development projects. We used a quasi-experimental design to quantitatively assess a conservation and development project involving commercial butterfly farming in the East Usambara Mountains of Tanzania. Using a survey of conservation attitudes, beliefs, knowledge, and behavior, we compared 150 butterfly farmers with a control group of 170 fellow community members. Due to the nonrandom assignment of individuals to the two groups, we used propensity-score matching and weighting in our analyses to control for observed bias. Eighty percent of the farmers believed butterfly farming would be impossible if local forests were cleared, and butterfly farmers reported significantly more participation in forest conservation behaviors and were more likely to believe that conservation behaviors were effective. The two groups did not differ in terms of their general conservation attitudes, attitudes toward conservation officials, or knowledge of conservation-friendly building techniques. The relationship between butterfly farming and conservation behavior was mediated by dependency on butterfly farming income. Assuming unobserved bias played a limited role, our findings suggest that participation in butterfly farming increased participation in conservation behaviors among project participants because farmers perceive a link between earnings from butterfly farming and forest conservation.

  13. Project Energize: Outcomes of a Community Confernece on Energy Conservation.

    ERIC Educational Resources Information Center

    Driscoll, Patricia; Deshler, David

    Intended to help program planners and evaluators in providing insight as to what can be accomplished in an educational program dealing with energy conservation, this report is an evaluation of the outcomes of a community conference on energy conservation. There is a brief description of the day-long energy conference attended by 178 people (38 of…

  14. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... significant impact on the quality of the human environment, and that an environmental impact statement is not required. ADDRESSES: Copies of the Final Environmental Assessment and Finding of No Significant Impact are... Reclamation Mitigation and Conservation Commission each signed a Finding of No Significant Impact...

  15. Small Commercial Program DOE Project: Impact evaluation. Final report

    SciTech Connect

    Bathgate, R.; Faust, S.

    1992-08-12

    In 1991, Washington Electric Cooperative (WEC) implemented a Department of Energy grant to conduct a small commercial energy conservation project. The small commercial ``Mom, and Pop`` grocery stores within WEC`s service territory were selected as the target market for the project. Energy & Solid Waste Consultant`s (E&SWC) Impact Evaluation is documented here. The evaluation was based on data gathered from a variety of sources, including load profile metering, kWh submeters, elapsed time indicators, and billing histories. Five stores were selected to receive measures under this program: Waits River General Store, Joe`s Pond Store, Hastings Store, Walden General Store, and Adamant Cooperative. Specific measures installed in each store and description of each are included.

  16. Augustine Band of Cahuilla Indians Energy Conservation and Options Analysis - Final Report

    SciTech Connect

    Paul Turner

    2008-07-11

    The Augustine Band of Cahuilla Indians was awarded a grant through the Department of Energy First Steps program in June of 2006. The primary purpose of the grant was to enable the Tribe to develop energy conservation policies and a strategy for alternative energy resource development. All of the work contemplated by the grant agreement has been completed and the Tribe has begun implementing the resource development strategy through the construction of a 1.0 MW grid-connected photovoltaic system designed to offset a portion of the energy demand generated by current and projected land uses on the Tribe’s Reservation. Implementation of proposed energy conservation policies will proceed more deliberately as the Tribe acquires economic development experience sufficient to evaluate more systematically the interrelationships between conservation and its economic development goals.

  17. The Choptank Watershed Wetland Conservation Effects Assessment Project: Monitoring the Effect of Wetland Conservation Practices on Water Quality

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Choptank Watershed Wetland Conservation Effects Assessment Project (CEAP) brings together an interdisciplinary group of experts and resources from multiple federal agencies and the University of Maryland to assess the ability of native, restored, and prior-converted wetlands on cropland to impro...

  18. MIT LMFBR blanket research project. Final summary report

    SciTech Connect

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record.

  19. Fawn Creek Government No. 1. Project Rio Blanco. Final report

    SciTech Connect

    Not Available

    1986-08-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low-permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7000-foot well in northwestern Colorado (Fig. 1). Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975, and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. Project Rio Blanco Site Restoration Final Report, NVO-183, January 1978, summarizes the activities throughout the restoration period and describes the final site status. The subsurface plugging of Fawn Creek Government No. 1 well commenced on July 16, 1986, and was completed on July 17, 1986. The details of the plugging operation are contained in Appendix B and the final status as plugged and abandoned is shown in Figure 3. The general method was to use the in-place gas production tubing as a working string to set a cast iron bridge plug in the 5 1/2 in. casing at 5030 feet, and to pump an 80-foot cement plug on top of the cast iron bridge plug. The casing was then perforated at selected points to place the required cement plugs. A total of about 266 cubic feet of cement slurry was pumped to place the cement plugs. The 10 3/4 in. surface casing and the 5 1/2 in. casing were cut off below the ground level and a steel plate was welded on the top of the 10 3/4 in. casing. A permanent marker was welded to the steel plate.

  20. Impact of the agricultural research service watershed assessment studies on the conservation effects assessment project cropland national assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    USDA initiated the Conservation Effects Assessment Project (CEAP) in 2002 to analyze societal and environmental benefits gained from the increased conservation program funding provided in the 2002 Farm Bill. The Natural Resources Conservation Service (NRCS), Agricultural Research Service (ARS), and...

  1. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  2. Development of Chengdu and sustainable utilization of the ancient Dujiangyan Water-Conservancy Project

    NASA Astrophysics Data System (ADS)

    Huang, X.; You, J.; Yang, P.; Chai, X.

    2015-05-01

    The Dujiangyan Water-Conservancy Project is a great water irrigation works in Chinese cultural history, which led the Min River water to the vast Chengdu Plain, and created fertile and pretty "land of abundance". Now Chengdu is facing increased water demand stress due mainly to rapid urbanization. This paper first analyses the available water resources of Chengdu based on historical hydrological data from 1964 to 2008. The results show that the average annual water resources were 8.9 billion m3 in 1986 and 7.9 billion m3 in 2008 under various environmental conditions. The future tendency of water demand in city development planning is predicted by the Policy Dialogue Model (PODIUM). Finally, the strategies for water resources exploitation accompanying the sustainable development pattern are studied. The result illustrates that rational and careful management are required to balance the gap between water supply and demand

  3. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  4. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  5. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  6. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  7. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Fish and Wildlife Service Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final... http://www.fws.gov/pacific/planning/main/docs/HI-PI/docsjcpearl.htm . Email: Laura_Beauregard@fws.gov... Kamehameha Highway, Room 2C, Hale`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project...

  8. Practicing Sustainability in an Urban University: A Case Study of a Behavior Based Energy Conservation Project

    ERIC Educational Resources Information Center

    Chan, Stuart; Dolderman, Dan; Savan, Beth; Wakefield, Sarah

    2012-01-01

    This case study of the University of Toronto Sustainability Office's energy conservation project, Rewire, explores the implementation of a social marketing campaign that encourages energy efficient behavior. Energy conservation activities have reached approximately 3,000 students and staff members annually, and have saved electricity, thermal…

  9. SOIL AND WATER CONSERVATION PROJECTS AND ACTIVITIES, A GUIDE FOR 4-H CLUB LEADERS.

    ERIC Educational Resources Information Center

    FOSTER, ALBERT B.; FOX, ADRIAN C.

    THIS PUBLICATION WAS PREPARED BY THE SOIL CONSERVATION SERVICE FOR USE WITH YOUTH GROUPS. VARIOUS ACTIVITIES AND PROJECTS ARE PRESENTED WHICH CAN BE USED TO DEVELOP CONCEPTS ABOUT SOIL AND WATER CONSERVATION. IN ORDER TO SIMPLIFY THE PROCESS OF DEMONSTRATING THESE ACTIVITIES, MANY OF THE CONCEPTS ARE PICTORIALLY ILLUSTRATED. THE ACTIVITIES…

  10. Quantifying ecosystem services from pastureland in the United States: The conservation effects assessment project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) is a multiagency scientific effort to quantify environmental outcomes of conservation practices applied to private agricultural lands of the United States. Society for Range Management members are familiar with the rangeland CEAP effort but may know...

  11. Final Report for USGS NEHRP Project 08HQGR0022

    SciTech Connect

    Rodgers, A. J.

    2015-09-29

    This is the final report for United States Geological Survey (USGS) National Earthquake Hazard Reduction Program (NEHRP) Project 08HQGR0022, entitled “Quantifying Uncertainties in Ground Motion Simulations for Scenario Earthquakes on the HaywardRodgers Creek Fault System Using the USGS 3D Seismic Velocity Model and Realistic Pseudodynamics Ruptures”. Work for this project involved three-dimensional (3D) simulations of ground motions for Hayward Fault (HF) earthquakes. We modeled moderate events on the HF and used them to evaluate the USGS 3D model of the San Francisco Bay Area. We also contributed to ground motions modeling effort for a large suite of scenario earthquakes on the HF. Results were presented at conferences (see appendix) and in one peer-reviewed publication (Aagaard et al., 2010).

  12. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  15. Programmable SAW development :Sandia/NASA project final report.

    SciTech Connect

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  16. When the virtual influences reality. The conservation project of the Toledo Gate in Ciudad Real (Spain)

    NASA Astrophysics Data System (ADS)

    Almagro Vidal, A.; Ramírez González, I.; Clemente San Román, C.

    2015-08-01

    powerful tool for conservation decision making and awareness raising. Furthermore, the interesting results of the final reconstruction hypothesis convinced the technical team responsible for the conservation to alter some aspects of the final project physical interventions in order to focus on some of the features and conclusions discovered through the virtual model study.

  17. Advanced Turbine Technology Applications Project (ATTAP) and Hybrid Vehicle Turbine Engine Technology Support project (HVTE-TS): Final summary report

    SciTech Connect

    1998-12-01

    This final technical report was prepared by Rolls-Royce Allison summarizing the multiyear activities of the Advanced Turbine Technology Applications Project (ATTAP) and the Hybrid Vehicle Turbine Engine Technology Support (HVTE-TS) project. The ATTAP program was initiated in October 1987 and continued through 1993 under sponsorship of the US Department of Energy (DOE), Energy Conservation and Renewable Energy, Office of Transportation Technologies, Propulsion Systems, Advanced Propulsion Division. ATTAP was intended to advance the technological readiness of the automotive ceramic gas turbine engine. The target application was the prime power unit coupled to conventional transmissions and powertrains. During the early 1990s, hybrid electric powered automotive propulsion systems became the focus of development and demonstration efforts by the US auto industry and the Department of energy. Thus in 1994, the original ATTAP technology focus was redirected to meet the needs of advanced gas turbine electric generator sets. As a result, the program was restructured to provide the required hybrid vehicle turbine engine technology support and the project renamed HVTE-TS. The overall objective of the combined ATTAP and HVTE-TS projects was to develop and demonstrate structural ceramic components that have the potential for competitive automotive engine life cycle cost and for operating 3,500 hr in an advanced high temperature turbine engine environment. This report describes materials characterization and ceramic component development, ceramic components, hot gasifier rig testing, test-bed engine testing, combustion development, insulation development, and regenerator system development. 130 figs., 12 tabs.

  18. 75 FR 32494 - Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... URBAN DEVELOPMENT Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances AGENCY... thereof) are established. PHAs complete energy audits, benefit/cost analyses for individual vs. master... or Leased Project-Audits, Utility Allowances. OMB Approval Number: 2577-0062. Form Numbers:...

  19. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  20. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  1. Geothermal heating demonstration project at Mammoth Lakes Village. Final report

    SciTech Connect

    Sims, A.V.; Campbell, R.G.

    1980-03-01

    A pilot project is described which demonstrated the feasibility of using geothermal energy for space heating and snow-melting at the Casa Diablo geothermal reservoir near Mammoth Lakes Village, California. The geothermal heating system employed was modeled after the geothermal district heating system used extensively in Iceland. The geothermal heating system incorporated a closed secondary heating loop (Iceland's system uses the geothermal fluids directly) to provide heat to a lumber store, warehouse and display area, and to melt snow on a connecting walkway between the buildings. The secondary loop, containing a mixture of fresh water and ethylene glycol, was heated by geothermal fluids produced from a nearby well. After passing through a heat exchanger, the cooled geothermal fluids were reinjected down another well. The heating system operated for three different periods, and the project concluded after a successful, long-term demonstration of well pump and heating system operation. Pump problems encountered early in the project were solved, and information gained in the final operation period indicated that reliable, extended periods of well pump operation can be achieved. The hydronic heaters effectively heated buildings, and the snow-melting walkway performed very well during winter operation.

  2. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    SciTech Connect

    Hooper, E.B.; Hill, D.N.

    2000-02-29

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T{sub c} and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive.

  3. Projected wetland densities under climate change: habitat loss but little geographic shift in conservation strategy.

    PubMed

    Sofaer, Helen R; Skagen, Susan K; Barsugli, Joseph J; Rashford, Benjamin S; Reese, Gordon C; Hoeting, Jennifer A; Wood, Andrew W; Noon, Barry R

    2016-09-01

    Climate change poses major challenges for conservation and management because it alters the area, quality, and spatial distribution of habitat for natural populations. To assess species' vulnerability to climate change and target ongoing conservation investments, researchers and managers often consider the effects of projected changes in climate and land use on future habitat availability and quality and the uncertainty associated with these projections. Here, we draw on tools from hydrology and climate science to project the impact of climate change on the density of wetlands in the Prairie Pothole Region of the USA, a critical area for breeding waterfowl and other wetland-dependent species. We evaluate the potential for a trade-off in the value of conservation investments under current and future climatic conditions and consider the joint effects of climate and land use. We use an integrated set of hydrological and climatological projections that provide physically based measures of water balance under historical and projected future climatic conditions. In addition, we use historical projections derived from ten general circulation models (GCMs) as a baseline from which to assess climate change impacts, rather than historical climate data. This method isolates the impact of greenhouse gas emissions and ensures that modeling errors are incorporated into the baseline rather than attributed to climate change. Our work shows that, on average, densities of wetlands (here defined as wetland basins holding water) are projected to decline across the U.S. Prairie Pothole Region, but that GCMs differ in both the magnitude and the direction of projected impacts. However, we found little evidence for a shift in the locations expected to provide the highest wetland densities under current vs. projected climatic conditions. This result was robust to the inclusion of projected changes in land use under climate change. We suggest that targeting conservation towards wetland

  4. Projected wetland densities under climate change: Habitat loss but little geographic shift in conservation strategy

    USGS Publications Warehouse

    Sofaer, Helen; Skagen, Susan; Barsugli, Joseph J.; Rashford, Benjamin S.; Reese, Gordon C.; Hoeting, Jennifer A.; Wood, Andrew W.; Noon, Barry R.

    2016-01-01

    Climate change poses major challenges for conservation and management because it alters the area, quality, and spatial distribution of habitat for natural populations. To assess species’ vulnerability to climate change and target ongoing conservation investments, researchers and managers often consider the effects of projected changes in climate and land use on future habitat availability and quality and the uncertainty associated with these projections. Here, we draw on tools from hydrology and climate science to project the impact of climate change on the density of wetlands in the Prairie Pothole Region of the USA, a critical area for breeding waterfowl and other wetland-dependent species. We evaluate the potential for a trade-off in the value of conservation investments under current and future climatic conditions and consider the joint effects of climate and land use. We use an integrated set of hydrological and climatological projections that provide physically based measures of water balance under historical and projected future climatic conditions. In addition, we use historical projections derived from ten general circulation models (GCMs) as a baseline from which to assess climate change impacts, rather than historical climate data. This method isolates the impact of greenhouse gas emissions and ensures that modeling errors are incorporated into the baseline rather than attributed to climate change. Our work shows that, on average, densities of wetlands (here defined as wetland basins holding water) are projected to decline across the U.S. Prairie Pothole Region, but that GCMs differ in both the magnitude and the direction of projected impacts. However, we found little evidence for a shift in the locations expected to provide the highest wetland densities under current vs. projected climatic conditions. This result was robust to the inclusion of projected changes in land use under climate change. We suggest that targeting conservation towards wetland

  5. Conservation.

    ERIC Educational Resources Information Center

    National Audubon Society, New York, NY.

    This set of teaching aids consists of seven Audubon Nature Bulletins, providing the teacher and student with informational reading on various topics in conservation. The bulletins have these titles: Plants as Makers of Soil, Water Pollution Control, The Ground Water Table, Conservation--To Keep This Earth Habitable, Our Threatened Air Supply,…

  6. Kootenai River White Sturgeon Conservation Aquaculture Project : Environmental Assessment.

    SciTech Connect

    US Bonneville Power Administration; Kootenai Tribe of Idaho

    1997-04-01

    Bonneville Power Administration (BPA) is responding to the need to prevent the extinction of the Kootenai River white sturgeon (Acipenser transmontanus) between Libby Dam in Montana and Corra Linn Dam in British Columbia. Construction and operation of Libby Dam altered the natural flow of the Kootenai River, especially the normal May-to-July flows needed for natural reproduction and recruitment. It also affected the river`s biological productivity and the quality of spawning and rearing habitat. As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), BPA must mitigate for losses of fish and wildlife (including related spawning grounds and habitat) that are attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries.

  7. Umatilla Satellite and Release Sites Project : Final Siting Report.

    SciTech Connect

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  8. Umatilla Satellite and Release Sites Project : Final Conceptual Design Report.

    SciTech Connect

    Montgomery, James M.

    1992-03-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  9. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  10. How national context, project design, and local community characteristics influence success in community-based conservation projects.

    PubMed

    Brooks, Jeremy S; Waylen, Kerry A; Borgerhoff Mulder, Monique

    2012-12-26

    Community-based conservation (CBC) promotes the idea that conservation success requires engaging with, and providing benefits for, local communities. However, CBC projects are neither consistently successful nor free of controversy. Innovative recent studies evaluating the factors associated with success and failure typically examine only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic) and explore synergies and trade-offs among these outcomes. We test hypotheses about how features of the national context, project design, and local community characteristics affect these measures of success. Using bivariate analyses and multivariate proportional odds logistic regressions within a multilevel analysis and model-fitting framework, we show that project design, particularly capacity-building in local communities, is associated with success across all outcomes. In addition, some characteristics of the local community in which projects are conducted, such as tenure regimes and supportive cultural beliefs and institutions, are important for project success. Surprisingly, there is little evidence that national context systematically influences project outcomes. We also find evidence of synergies between pairs of outcomes, particularly between ecological and economic success. We suggest that well-designed and implemented projects can overcome many of the obstacles imposed by local and national conditions to succeed in multiple domains.

  11. How national context, project design, and local community characteristics influence success in community-based conservation projects

    PubMed Central

    Brooks, Jeremy S.; Waylen, Kerry A.; Borgerhoff Mulder, Monique

    2012-01-01

    Community-based conservation (CBC) promotes the idea that conservation success requires engaging with, and providing benefits for, local communities. However, CBC projects are neither consistently successful nor free of controversy. Innovative recent studies evaluating the factors associated with success and failure typically examine only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic) and explore synergies and trade-offs among these outcomes. We test hypotheses about how features of the national context, project design, and local community characteristics affect these measures of success. Using bivariate analyses and multivariate proportional odds logistic regressions within a multilevel analysis and model-fitting framework, we show that project design, particularly capacity-building in local communities, is associated with success across all outcomes. In addition, some characteristics of the local community in which projects are conducted, such as tenure regimes and supportive cultural beliefs and institutions, are important for project success. Surprisingly, there is little evidence that national context systematically influences project outcomes. We also find evidence of synergies between pairs of outcomes, particularly between ecological and economic success. We suggest that well-designed and implemented projects can overcome many of the obstacles imposed by local and national conditions to succeed in multiple domains. PMID:23236173

  12. Final report for the DOE Suede Project, (solar utilization/economic development and employment project)

    SciTech Connect

    Katz, G.; Zahigian, E. Jr.

    1983-10-19

    The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational training program enrollees) under staff guidance manufactured, installed, and maintained all the solar energy systems. This report describes each of the energy projects and explains the design, manufacture and installation of each system. Each system is evaluated on the basis of energy savings, aquisition and maintenance costs, operation, service requirements and reliability.

  13. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  14. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    SciTech Connect

    Bigelow, Erik

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  15. The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation

    SciTech Connect

    Not Available

    1980-03-01

    The Woodlands is a HUD Title VII New Town located near Houston, including 22,000 acres; the plan for the new town consists of 6 residential villages, a town center (Metro), and a Trade Center for larger-scale industrial use. Included within the program for each village are schools and commercial activities, as well as employment activities. The Woodlands is planned to be developed over a 26-year period (commenced in 1972) with an ultimate population of 150,000. Following a summary chapter, Chapter II presents background material on The Woodlands and results of the study are summarized. Chapter III describes the project team and its organizational structure. Chapter IV outlines and documents the methodology that was employed in developing, analyzing, and evaluating the case study. The next chapter describes and analyzes the conventional plan, documents the process by which energy-conserving methods were selected, and evaluates the application of these methods to the Metro Center Study area. Chapter VI discusses constraints to implementation and is followed by a final chapter that presents the general conclusions from the case study and suggests directions for further investigation.

  16. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  17. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    SciTech Connect

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  18. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  19. Assessment of the industrial energy-conservation program. Final report of the Committee on Assessment of the Industrial Energy Conservation Program

    SciTech Connect

    1982-01-01

    Industrial operations in the United States account for some 37% of the nation's consumptions of energy. It has been estimated that this figure will increase to 50% by 1990 unless appropriate industrial energy conservation measures are adopted. However, such measures are difficult to implement in spite of the potential of various existing, emerging, and advanced technologies that can be applied to the problem. Specifically, the application of many industrial energy conservation measures entails high economic, technological, and institutional risks and uncertainties that constrain industries from adopting such measures. Accordingly, in 1975 the federal government started a program designed to mitigate these risks and uncertainties via government-industry partnership arrangements in the interests of national energy conservation. An important element of this program is the Industrial Energy Conservation Program in the Federal Department of Energy (DOE). In June 1980, DOE asked the National Materials Advisory Board, a unit of the National Academy of Sciences-National Research Council, to form a study committee to assess the effectiveness of the Industrial Energy Conservation Program. The committee concluded that federal support embodied in the DOE program, present and planned, is important to conserving additional industrial energy. However, the committee also concluded that the program needs various improvements in project selection and management and in transfer of results to industry. The committee's findings and recommendations and the results of the deliberation of the committee's three panels, a special report on heat and power, and a report on the visit by four members of the committee to Japan are presented.

  20. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  1. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... Native American Career and Technical Education Program; Final Waivers and Extension of Project Period... Information: Final Waivers and Extension of Project Period for the Native American Career and Technical... projects funded in fiscal year (FY) 2007 under the Native American Career and Technical Education...

  2. OVERVIEW OF THE MARK TWAIN LAKE/SALT RIVER BASIN CONSERVATION EFFECTS ASSESSMENT PROJECT

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Mark Twain Lake/Salt River Basin was selected as one of 12 USDA-Agricultural Research Service benchmark watersheds for the Conservation Effects Assessment Project (CEAP) because of documented soil and water quality problems and broad stakeholder interest. The basin is located in northeastern Mis...

  3. Energy conserving site design: Greenbrier case study, Chesapeake, Virginia. Final report

    SciTech Connect

    Not Available

    1980-04-01

    A specific case study of project planning for energy conservation for a major planned unit development at the 3000-acre Greenbrier development site in Chesapeake, Virginia, is summarized. The research suggests that very considerable reductions in energy conservation can be achieved within the confines of private-sector land development and residential construction with increased incremental costs of $200.00 to $3150.00 per dwelling unit. It is hypothesized that energy consumption at Greenbrier can be reduced by one-half with an average annual savings of 21,275 kWh per residential unit, using state-of-the-art technology with careful planning and control. This represents an annual savings $750.00 per unit at the current utility rate of 3.5 cents per kWh. These savings can be achieved through reduction in heating and cooling loads and application of more-efficient heating and cooling of the remaining loads. The reduction in loads are achieved by redesign of the land plan to include a higher percentage of south-facing lots, use of vegetation to modify microclimate, decreases in air infiltration, the use of 2 x 6 framing, better insulation, and the use of an insulated slab-on-grade foundation. Further energy savings can be expected by increased efficiencies in mechanical systems used for space heating and cooling and domestic hot water. When applied to the single-family portion of Greenbrier, containing 541 dwelling units, these options reduce the total end-use energy consumption 54.7%. This reduction represents an annual savings of $432,800.00 for an initial capital investment of $1.7 million.

  4. Multi-cooperation of Cultural Heritage Conservation: The Cangdong Project of Guangdong Province

    NASA Astrophysics Data System (ADS)

    Tan, J.

    2015-09-01

    In recent years, some workshops and research cases have arisen in China to seek for suitable ways for heritage conservation and development of historic villages. However, the issue of multi-cooperation has not been much mentioned in research works. The case of Cangdong Project in Guangdong Province is a social enterprise. It is a center focusing on heritage education. It organizes tailor-made workshops for interested people from all over China and Hong Kong, Macao and overseas, including university courses for credits, summer/winter camps for primary and middle school students, as well as common people who are interested in heritage conservation. The purpose of the education center is to enhance heritage/cultural interest of the younger generations and common people, and try to work with local villagers to build a wealthy community. Nowadays, more and more villagers moved out for work and the countryside population in China is decreasing, this project also aims to create work opportunities for villagers through heritage conservation projects, so that the villagers can be willing to stay. The project focuses more in a sustainable way for community development. It has been five years since the project was set up in Cangdong Village. The project team worked with villagers, city people, students, scholars, different levels of local governments, investors, Medias, charitable organizations, as well as the market of tourism. As such, a platform of multi-cooperation for the above parties has formed during the past five years. This paper takes the Project experience from 2010-2015 as the case to study multi-cooperation in the field of heritage conservation in China, as well as to discuss how to co-operate the subjective initiatives of different stokeholds.

  5. Final report Hanford environmental compliance project 89-D-172

    SciTech Connect

    Kelly, J.R.

    1996-02-08

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations.

  6. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  7. The Workplace Literacy System Project (WLS). Final Performance Report.

    ERIC Educational Resources Information Center

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  8. Evaluation of the Appalachian Regional Commission's Educational Projects: Final Report.

    ERIC Educational Resources Information Center

    Silverstein, Gary; Bartfai, Nicole; Plishker, Laurie; Snow, Kyle; Frechtling, Joy

    This report presents findings from an evaluation of 84 educational projects funded by the Appalachian Regional Commission (ARC) during the 1990's. Data were collected via document reviews, interviews, a mail survey completed by 78 projects, and eight site visits. Most projects provided services to rural areas or community segments most in need.…

  9. Project HEED. Final Evaluation Report, 1974-1975.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy J.

    Project HEED's (Heed Ethnic Education Deplorization) main emphasis in 1974-75 was to develop reading and cultural awareness skills for kindergarten through 4th grades in the 7 project schools on American Indian reservations in Arizona. In its 4th year of operation, the project (funded under Elementary and Secondary Education Title III) involved…

  10. 76 FR 37090 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... research, demonstration projects, training, and related activities, including international activities; to... Final Priorities; Disability and Rehabilitation Research Projects and Centers Program AGENCY: Office of... for two Rehabilitation Engineering Research Centers (RERCs). SUMMARY: The Assistant Secretary...

  11. Final Report - Conservation & Renewable Energy Potential Study For Smith River Rancheria

    SciTech Connect

    Greg Retzlaff

    2007-07-01

    In January 2006 the Smith River Rancheria (SRR), located in Smith River, California, contracted with the team of Strategic Energy Solutions (SES) and Evergreen NRG to conduct a study for the community. The objective of the study was to identify renewable generation opportunities that would facilitate Rancheria energy independence through SRR owned and operated power projects. These generation facilities were to be located either on or near the reservation. Specifically, the Rancheria was interested in the viability of generating electric power using biomass and wind fuel resources. Initial research identified that a very small portion of the community's energy could be offset by renewable energy generation due to the low solar resource in this area, and the lack of significant wind or biomass resources on or near reservation land. Some larger projects were identified which offered little or no benefit to the Rancheria. As a result, the scope of this study was changed in October 2006 to focus on energy efficiency opportunities for key reservation facilities, with a continued analysis of smaller renewable energy opportunities within reservation boundaries. The consulting team initially performed a resource analysis for biomass and solar generation opportunities in the region of the Rancheria. It was quickly concluded that none of these options would yield renewable power for the Rancheria at costs competitive with current utility sources, and that any larger installations would require substantial funding that may not be available. Having made these conclusions early on, the study effort was redirected and the team investigated each of the major Rancheria buildings to look for solar, wind and conservation opportunities. The buildings were audited for energy use and the roof areas were examined for exposure of solar radiation. Wind resources were also investigated to determine if smaller wind turbines would offer power generation at a reasonable cost.

  12. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in King... approvals for the following project in the State of Washington: East Link Light Rail Transit Project,...

  13. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  14. 77 FR 59412 - Great Bay National Wildlife Refuge, Rockingham County, NH; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... Karner blue butterfly conservation easement in Concord, New Hampshire. Great Bay NWR is administered by... refuge and Karner blue butterfly conservation easement for the next 15 years. ADDRESSES: You may view or... the Karner blue butterfly conservation easement in Concord, New Hampshire. The 29-acre...

  15. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    SciTech Connect

    Lear, Jon; Bennett, Carlon; Lear, Dan; Jones, Phil L.; Burdge, Mark; Barker, Ben; Segall, Marylin; Moore, Joseph; Nash, Gregory; Jones, Clay; Simmons, Stuart; Taylor, Nancy

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  16. Impact of energy pricing and discount-rate policies on energy conservation in federal buidings. Final report

    SciTech Connect

    Fuller, S.K.; Ruegg, R.T.

    1985-11-01

    The study investigates how energy-conservation projects for federal buildings would be affected by a change in energy pricing and discount-rate policies. It focuses on the choice between marginal-cost prices versus average market prices and a 10% discount rate versus a 7% discount rate. Graphical and numerical comparisons of hypothetical cases in selected geographical areas illustrate the expected impact on selection, design and sizing, and priority of energy-saving projects.

  17. Encoal mild coal gasification project: Encoal project final report, July 1, 1997--July 31, 1997

    SciTech Connect

    1997-07-01

    This document is the summative report on the ENCOAL Mild Coal Gasification Project. It covers the time period from September 17, 1990, the approval date of the Cooperative Agreement between ENCOAL and the US Department of Energy (DOE), to July 17, 1997, the formal end of DOE participation in the Project. The Cooperative Agreement was the result of an application by ENCOAL to the DOE soliciting joint funding under Round III of the Clean Coal Technology Program. By June 1992, the ENCOAL Plant had been built, commissioned and started up, and in October 1994, ENCOAL was granted a two-year extension, carrying the project through to September 17, 1996. No-cost extensions have moved the Cooperative Agreement end date to July 17, 1997 to allow for completion of final reporting requirements. At its inception, ENCOAL was a subsidiary of Shell Mining Company. In November 1992, Shell Mining Company changed ownership, becoming a subsidiary of Zeigler Coal Holding Company (Zeigler) of Fairview Heights, Illinois. Renamed successively as SMC Mining Company and then Bluegrass Coal Development Company, it remained the parent entity for ENCOAL, which has operated a 1,000-ton/day mild coal gasification demonstration plant near Gillette, Wyoming for nearly 5 years. ENCOAL operates at the Buckskin Mine owned by Triton Coal Company (Triton), another Zeigler subsidiary.

  18. Salton Sea Scientific Drilling Project Archival Reference, Final Draft

    SciTech Connect

    1991-03-13

    This report provides an archival reference to the scientific information and other pertinent documents and materials associated with the Salton Sea Scientific Drilling Project (SSDP). This archiving process ensures that valuable technical data and information obtained during the life of the project can be retrieved, organized and maintained as a historical record for future reference. This paper describes the background of the project and the process used for archiving the materials. [DJE-2005

  19. Final Report for NMBSA Project, Monika Kaden, 2016

    SciTech Connect

    Ward, William Carl

    2016-12-13

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  20. Conservation.

    ERIC Educational Resources Information Center

    Camp Fire Girls, Inc., New York, NY.

    The first section of this manual has been developed to help leaders and youth examine and gradually understand some of the more complex environmental factors. It helps to explain what things are where and why, why a certain project has been suggested, whether it is a practical one for a given place, and what must be known before it can be…

  1. Saudi Arabian seismic deep-refraction profiles; final project report

    USGS Publications Warehouse

    Healy, J.H.; Mooney, W.D.; Blank, H.R.; Gettings, M.E.; Kohler, W.M.; Lamson, R.J.; Leone, L.E.

    1983-01-01

    In February 1978 a seismic deep-refraction profile was recorded by the U.S. Geological Survey along a 1000-km line across the Arabian Shield in western Saudi Arabia. The line begins in Mesozoic cover rocks near Riyadh on the Arabian Platform, leads southwesterly across three major Precambrian tectonic provinces, traverses Cenozoic rocks of the coastal plain near Jizan (Tihamat-Asir), and terminates at the outer edge of the Farasan Bank in the southern Red Sea. More than 500 surveyed recording sites were occupied, including 19 in the Farasan Islands. Six shot points were used: five on land, with most charges placed below the water table in drill holes, and one at sea, with charges placed on the sea floor and detonated from a ship. Slightly more than 61 metric tons of explosives were used in 19 discrete firings. Seismic energy was recorded by 100 newly-developed portable seismic stations deployed in approximately 200 km-long arrays for each firing. Each station consisted of a standard 2-Hz vertical component geophone coupled to a self-contained analog recording instrument equipped with a magnetic-tape cassette. In this final report, we fully document the field and data-processing procedures and present the final seismogram data set as both a digital magnetic tape and as record sections for each shot point. Record sections include a normalized set of seismograms, reduced at 6 km/s, and a true-amplitude set, reduced at 8 km/s, which have been adjusted for amplifier gain, individual shot size, and distance from the shot point. Appendices give recorder station and shot information, digital data set descriptions, computer program listings, arrival times used in the interpretation, and a bibliography of reports published as a result of this project. We used two-dimensional ray-tracing techniques in the data analysis, and our interpretation is based primarily on horizontally layered models. The Arabian Shield is composed, to first-order, of two layers, each about 20 km

  2. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    .... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project involves... (FHWA- WISC-EIS-09-01-F), in the Record of Decision (ROD) issued on February 10, 2012, and in other... Amendments and Reauthorization Act of 1986 [Pub. L. 99-499]; Resource Conservation and Recovery Act [42...

  3. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    SciTech Connect

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  4. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and…

  5. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  6. Skill Standards and Certification Project. Final Detailed Report. Year Two.

    ERIC Educational Resources Information Center

    North Lake Coll., Irving, TX.

    This document reports on the second year of a project conducted to design a seamless training application model for infusing workplace skills into academic and occupational programs at the secondary, postsecondary, and apprenticeship level using the components of SCANS (Secretary's Commission on Achieving Necessary Skills). For this pilot project,…

  7. Parent Imprisonment and Child Socialization Research Project. Final Report.

    ERIC Educational Resources Information Center

    Howard Univ., Washington, DC. Dept. of Psychology.

    Conducted in response to the 7% increase in black female single-parent families during 1970 to 1975, this project systematically investigates the impact of parent-absence on the socialization of black children. Divided into four separate studies, the project concentrates on (1) community-social variables related to black parent-absent families;…

  8. The Ninos Especiales Outreach Training Project (NEOTP). Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth; And Others

    The Ninos Especiales Outreach Training Project was a 3-year federally funded project to provide information, training, and evaluation related to a culturally sensitive, family-focused model of early intervention services for infants with severe disabilities and their families of Puerto Rican heritage. Implementation occurred through three major…

  9. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  10. Project HEED. Final Evaluation Report, 1973-74.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy

    1973-74 approximately 1,100 Indian students in grades 1 through 8 participated in Project HEED (Heed Ethnic Educational Depolarization) in Arizona. The project target sites were 59 classrooms at Sacaton, Sells, Peach Springs, San Carlos, Topowa, Many Farms, St. Charles Mission, and Hoteville. Primary objectives were: (1) improvement in reading…

  11. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  12. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  13. KICKAPOO - NORTH CANADIAN PROJECT, 1966-67. FINAL REPORT.

    ERIC Educational Resources Information Center

    KEELY, SUZANN

    SEVENTY-ONE CHILDREN WERE ENROLLED IN THE KICKAPOO-NORTH CANADIAN PROJECT FOR A PERIOD OF 2 MONTHS OR LONGER. THIS REPORT IS DIVIDED INTO 7 SECTIONS AND 2 APPENDICES. PART I CONTAINS A DESCRIPTION OF THE PROGRESS OF EACH CHILD DURING THE PROJECT. PART II CONTAINS BIOGRAPHICAL DESCRIPTIONS OF THE STAFF. PART III CONTAINS A LIST OF SPECIAL…

  14. Incentives in Education Project, Impact Evaluation Report. Final Report.

    ERIC Educational Resources Information Center

    Planar Corp., Washington, DC.

    This report describes results of a demonstration project carried out in four cities during 1971-72. The project aimed at exploring the feasibility and impact of two different forms of money incentives payments. In one form -- the "Teacher-Only" model -- the teachers in a school were offered a series of bonuses ranging from $150 to $600 per class…

  15. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  16. Project GROW [Green River Opportunities for Work]: Final Report.

    ERIC Educational Resources Information Center

    Vikers, Theo; Gibson, Melvin Pat

    Summarizing the progress of Project Green River Opportunities for Work (Project GROW), the document reviews the study's background and the activities resulting from a third party evaluation by the Southern Association of Colleges and Schools. Objectives based on the evaluation and recommendations included: (1) development of an articulated and…

  17. Project MAVE - Model for Articulated Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Vanek, Carol

    Based on the need to strengthen articulation activities within the Illinois educational system, this project was designed to provide a formal articulation mechanism utilizing the concept of institutional coordination for the development of comprehensive vocational programs and services. Phase 1 of the project developed an articulation process…

  18. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  19. Competency-Based Adult Vocational Education Project. Final Report.

    ERIC Educational Resources Information Center

    Auburn Univ., AL. Dept. of Vocational and Adult Education.

    This applied project recognized the priority to identify, describe, and evaluate existing vocational education programs that are coordinated with the adult performance level (APL) competency based approach. Furthermore, the project supported the value of developing and testing one or more models for APL/vocational education interface. In order to…

  20. Honey Lake Geothermal Project, Lassen County, California. Final technical report

    SciTech Connect

    Not Available

    1984-11-01

    This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

  1. Faces of Change Series. Documentary Film Project: Final Report.

    ERIC Educational Resources Information Center

    Miller, Norman N.

    The objectives of the Educational Materials Project were to produce print materials to accompany "The Faces of Change," a series of 26 films and some 60 essays and instructional documents produced for college classes between 1972 and 1975. The scope of the project covered two film production grants, a grant for archiving uncut footage at…

  2. Cooperative Developmental Energy Project. Final Report of Phase I.

    ERIC Educational Resources Information Center

    Halachmi, Arie

    This report provides a summary and description of the activities performed during Phase I (August 1983 to July 1984) of the Cooperative Developmental Energy Project of Tennessee State University. The major intent of the project was to develop a plan of action for enhancing employment and career mobility of minorities in the energy industry.…

  3. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  4. A Program Evaluation Manual for Project Initiators. Final Report.

    ERIC Educational Resources Information Center

    Senf, Gerald; Anderson, David

    Intended for directors of special education projects, the manual provides guidelines for program evaluation. It is explained that the manual developed out of the experiences of the staff of the Leadership Training Institute in Learning Disabilities which provided technical assistance to 43 state projects. The manual's eight major sections focus on…

  5. DPI Gender Equity Leadership Project - Phase II. Final Report.

    ERIC Educational Resources Information Center

    Riley, Linda L.

    This report documents a project to provide technical assistance, coordination, training, and resources to programs implementing the Wisconsin Model for Sex Equity in Career and Vocational Education. It describes how technical assistance was provided to all school districts served through a consortium and three special projects. Other project…

  6. The Lanai Visitor Serving Workplace Literacy Project: Final Performance Report.

    ERIC Educational Resources Information Center

    Hawaii Human Development, Honolulu.

    This report describes the outcomes of a project designed to aid agricultural workers in their transition to hotel jobs. Displaced workers (predominantly Filipino) from a Dole plantation were forced to seek employment in new resorts on Lanai. The goals of the project were to: (1) qualify former Dole employees for jobs in the newly-developed resort…

  7. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  8. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    NASA Astrophysics Data System (ADS)

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  9. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Geological Survey Notice of Availability of the Final Environmental Assessment for Solar Roof Project AGENCY..., the US Geological Survey (USGS) has prepared a Final Environmental Assessment for the Solar Roof... for the Solar Roof Project should immediately contact the USGS S.O. Conte Anadromous Fish...

  10. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  11. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Area Power Administration Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation AGENCY...), announces its Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program...

  12. 76 FR 21403 - Notice of Availability of the Final Environmental Impact Statement for the Genesis Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Final Environmental Impact Statement (EIS) for the Newmont Mining Corporation's proposed Genesis Project...] Notice of Availability of the Final Environmental Impact Statement for the Genesis Project, Eureka County... addressed in the Draft EIS include: (1) The cumulative impacts of mining and related actions on...

  13. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  14. Keweenaw Bay Indian Community Weatherization Training Project Final Report

    SciTech Connect

    Denomie, Lawrence J.; LaPointe, Bruce

    2012-03-26

    The objective of the project is to train the appropriate staff, both new and existing from various KBIC Departments in the core competencies needed to develop a comprehensive Tribal community weatherization program. The goal of the project was to build the staff capacity to enable the KBIC to establish a Tribal weatherization program that promotes energy sufficiency throughout the Tribal community. The project addresses the needs identified in the 2008 KBIC Strategic Energy Plan to build the staff capacity and increase the knowledge base within the Tribal Departments and to implement an energy efficiency program through community education and financial assistance incentives.

  15. Final Report for Project FG02-05ER25685

    SciTech Connect

    Xiaosong Ma

    2009-05-07

    In this report, the PI summarizes the results and achievements obtained in the sponsored project. Overall, the project has been very successful and produced both research results in massive data-intensive computing and data management for large scale supercomputers today, and in open-source software products. During the project period, 14 conference/journal publications, as well as two PhD students, have been produced due to exclusive or shared support from this award. In addition, the PI has recently been granted tenure from NC State University.

  16. Austin Children`s Museum ``Go Power`` project. Final report

    SciTech Connect

    Not Available

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  17. Estimation of affine motion from projection data using a mass conservation model.

    PubMed

    Negahdar, Mohammadreza; Amini, Amir A

    2011-01-01

    An approximate model for the effect of respiration is that the cross section of the thoracic area under interrogation experience time-varying magnification and displacement along two perpendicular axes - we propose to model this motion as parametric affine motion. A theoretical framework for determination of parameters of affine motion modeling the global respiratory motion based on the sinogram data in the projection domain is described. It is assumed that the spatial image considered is a density image where conservation of mass holds.

  18. Final Project Report for "Interfacial Thermal Resistance of Carbon Nanotubes”

    SciTech Connect

    Cumings, John

    2016-04-15

    This report describes an ongoing project to comprehensively study the interfacial thermal boundary resistance (Kapitza resistance) of carbon nanotubes. It includes a list of publications, personnel supported, the overall approach, accomplishments and future plans.

  19. Final Project Report: A Polyhedral Transformation Framework for Compiler Optimization

    SciTech Connect

    Sadayappan, Ponnuswamy; Rountev, Atanas

    2015-06-15

    The project developed the polyhedral compiler transformation module PolyOpt/Fortran in the ROSE compiler framework. PolyOpt/Fortran performs automated transformation of affine loop nests within FORTRAN programs for enhanced data locality and parallel execution. A FORTAN version of the Polybench library was also developed by the project. A third development was a dynamic analysis approach to gauge vectorization potential within loops of programs; software (DDVec) for automated instrumentation and dynamic analysis of programs was developed.

  20. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  1. An Evaluation of the Institutional Conservation Program: Results of On-Site Analyses. Final Report.

    ERIC Educational Resources Information Center

    Synectics Group, Inc., Washington, DC.

    The Institutional Conservation Program (ICP) is a voluntary grant program designed to help such non-profit institutions as schools, hospitals, local governments, and public care facilities save energy and reduce anticipated energy-related costs. Another primary ICP goal is to conserve oil, thereby reducing the nation's dependence on imported…

  2. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  3. OECD MCCI project final report, February 28, 2006.

    SciTech Connect

    Farmer, M. T.; Lomperski, S.; Kilsdonk, D. J.; Aeschlimann, R. W.; Basu, S.

    2011-05-23

    -dimensional. Although the MACE Scoping Test was carried out with a two-dimensional concrete cavity, the interaction was flooded soon after ablation was initiated to investigate debris coolability. Moreover, due to the scoping nature of this test, the apparatus was minimally instrumented and therefore the results are of limited value from the code validation viewpoint. Aside from the MACE program, the COTELS test series also investigated 2-D CCI under flooded cavity conditions. However, the input power density for these tests was quite high relative to the prototypic case. Finally, the BETA test series provided valuable data on 2-D core concrete interaction under dry cavity conditions, but these tests focused on investigating the interaction of the metallic (steel) phase with concrete. Due to these limitations, there is significant uncertainty in the partitioning of energy dissipated for the ablation of concrete in the lateral and axial directions under dry cavity conditions for the case of a core oxide melt. Accurate knowledge of this 'power split' is important in the evaluation of the consequences of an ex-vessel severe accident; e.g., lateral erosion can undermine containment structures, while axial erosion can penetrate the basemat, leading to ground contamination and/or possible containment bypass. As a result of this uncertainty, there are still substantial differences among computer codes in the prediction of 2-D cavity erosion behavior under both wet and dry cavity conditions. Thus, a second key aim of the current program was to provide the necessary data to help resolve these modeling differences. In light of the above issues, the OECD-sponsored Melt Coolability and Concrete Interaction (MCCI) program was initiated at Argonne National Laboratory. The project conducted reactor materials experiments and associated analysis to achieve the following technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focused on providing both confirmatory

  4. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  5. Albuquerque Integration Outreach Project. Final Performance Report, July 1, 1981-June 30, 1982.

    ERIC Educational Resources Information Center

    Beam, Gail C.

    The final report details results of the Albuquerque Integration Outreach Project, designed to increase awareness about serving young handicapped children in mainstream settings. The performance section presents data on seven project objectives, including developing a project brochure, conducting awareness workshops, disseminating research results…

  6. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  7. Aberdeen Area Final Evaluation Report, ESEA Title I Project, Fiscal Year 1974.

    ERIC Educational Resources Information Center

    Bureau of Indian Affairs (Dept. of Interior), Aberdeen, SD. Aberdeen Area Office.

    Compiled from the final evaluation reports of 36 direct instruction projects and 1 Area Technical Assistance project (94 percent of which were contracted and administered by American Indian tribes or Indian school boards), this report is a summative evaluation of 1974 Title I projects in North and South Dakota. A brief introduction describes the…

  8. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  9. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  10. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  11. Soil erosion and conservation in the United States: An overview. Agriculture information bulletin. (Final)

    SciTech Connect

    Magleby, R.; Sandretto, C.; Crosswhite, W.; Osborn, C.T.

    1995-10-01

    Soil erosion on agricultural land in the United States does not pose an immediate threat to the Nation`s ability to produce food and fiber. However, erosion is impairing long-term soil productivity in some areas and is the largest contributor to nonpoint source pollution of the Nation`s waterways. Conservation and commodity programs are currently being coordinated to futher conservation objectives. This report provides background information on soil use, erosion, and conservation policies and programs; summarizes assessments of economic and environmental effects of erosion; and discusses policies and programs as well as options for their improvement.

  12. Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

  13. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  14. Final Report for NA-22/DTRA Cosmic Ray Project

    SciTech Connect

    Wurtz, Ron E.; Chapline, George F.; Glenn, Andrew M.; Nakae, Les F.; Pawelczak, Iwona A.; Sheets, Steven A.

    2015-07-21

    The primary objective of this project was to better understand the time-correlations between the muons and neutrons produced as a result of high energy primary cosmic ray particles hitting the atmosphere, and investigate whether these time correlations might be useful in connection with the detection of special nuclear materials. During the course of this project we did observe weak correlations between secondary cosmic ray muons and cosmic ray induced fast neutrons. We also observed strong correlations between tertiary neutrons produced in a Pb pile by secondary cosmic rays and minimum ionizing particles produced in association with the tertiary neutrons.

  15. Energy Efficiency and Conservation Block Grant (EECBG)- Better Buildings Neighborhood Program Final Report

    SciTech Connect

    Brown, Donisha; Harris, Barbara; Blue, Cynthia; Gaskins, Charla

    2014-09-16

    The original BetterBuildings for Greensboro grant program included an outreach campaign to inform 100% of the Greensboro community about the benefits of reducing energy use; a plan to reduce energy consumption in at least 34% of the homes and 10% of the other buildings in the east Greensboro target area; and a plan to create and retain jobs in the energy conservation industry. Under the original program structure the City of Greensboro planned to partner with local and regional lenders to create a diversified portfolio of loan products to meet the needs of various income levels and building types. All participants would participate in the loan programs as a method of meeting the program’s 5 to1 private capital match/leverage requirements. In June 2011 the program was restructured to include partnerships with large commercial and multifamily projects, with these partners providing the greater portion of the required match/leverage. The geographic focus was revised to include reducing energy consumption across the entire City of Greensboro, targeting neighborhoods with high concentrations of low-moderate income households and aged housing stock. The community outreach component used a neighborhood-based approach to train community residents and volunteers to conduct door-to-door neighborhood sweeps; delivered high quality information on available program resources; helped residents to evaluate alternative energy efficiency measures and alternative financing sources; assisted with contractor selections and monitoring/evaluation of work; coordinated activities with BetterBuildings program partners; and collected data required by the Department of Energy. Additionally, HERO (Home Energy Response Officers) delivered intro packages (energy efficiency information and products) to thousands of households at the initial point of contact. A pilot program (Early Adopters) was offered from March 1, 2011 through June 30, 2011. The Early Adopters program was designed to offer

  16. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  17. Driver Aid and Education Test Project. Final Report.

    ERIC Educational Resources Information Center

    Shadis, W.; Soucek, S. J.

    A driver education project tested the hypothesis that measurable improvements in fleet fuel economy can be achieved by driver awareness training in fuel-efficient driving techniques and by a manifold vacuum gauge, used individually or in combination with each other. From April 1976 through December 1977 data were collected in the Las Vegas,…

  18. Research Project Concerning Students From Minority Groups. Final Report.

    ERIC Educational Resources Information Center

    McArthur, John H.

    The motivation of this project was a desire on the part of the Harvard Business School to augment equality of career opportunities in management for minority group members and to insure expanded managerial training so that new capabilities would be developed to match new opportunities. This document describes programs undertaken by the faculty and…

  19. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  20. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  1. The Maryland Career Development Project--Phase I. Final Report.

    ERIC Educational Resources Information Center

    Mietus, Walter S.; Stilling, Chris

    This first phase of an exemplary career development project in Maryland included the following seven action programs, each with general and specific goals and objectives: (1) a team approach at selected junior high schools involving counselors, home economics, and industrial arts teachers, (2) use of a full-time resource consultant in five…

  2. South Umpqua School District #19 Experimental Schools Project. Final Report.

    ERIC Educational Resources Information Center

    South Umpqua School District, Myrtle Creek, OR.

    This document reports on a federally funded Experimental Schools project that took place over a five-year period, 1972-77, in a small, rural Oregon district. The report is primarily a narrative on change and change agentry as viewed from the perspective of school personnel. After background discussion and brief descriptions of the program,…

  3. Project REAL Evaluation: Final Report 1999-2000 School Year.

    ERIC Educational Resources Information Center

    Howley, Craig

    Project REAL (Rural Education Aligned for Learning) aims to improve mathematics and science education in grades 5-8 in five rural Ohio school districts identified as in "academic emergency" or on "academic watch." Program goals are to reform curricula to teach skills and concepts, rather than facts; improve students' math and…

  4. Victorias energy efficiency and cogeneration project. Final report

    SciTech Connect

    1998-10-31

    This report describes a two-phase energy project currently contemplated for joint implementation at the Victorias Milling Company, a large sugar mill and refinery on the island of Negros in the Visayas region of the Philippines. The Energy Efficiency (EE) phase is expected to reduce of eliminate VMC`s fossil fuel consumption, which will have a direct and substantial impact on carbon emissions. Phase I is an EE project which involves the installation of equipment to reduce steam and electricity demand in the factories. Phase II, will involve retrofitting and increasing the capacity of the steam and power generation systems, and selling power to the grid. By increasing efficiency and output, the cogeneration project will allow the factory to use only bagasse sugar cane fiber waste as fuel for energy needs. The cogeneration project will also eliminate VMC`s electricity purchases and supply additional power for the island, which will offset generation capacity expansion on the island and the Visayas region.

  5. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  6. Rural Improvement Project (RIP). [Summary and Final Evaluation Report.

    ERIC Educational Resources Information Center

    Yvon, Bernard R., Comp.

    The aim of the Rural Improvement Project of Maine from Spring, 1969-Fall, 1970 was to improve the quality of rural education through an innovative attempt to utilize specialized, trained personnel (Cooperating Rural Resource Teachers; associate teachers; teacher aides; 3 undergraduate teachers; and an elementary guidance counselor) and to…

  7. Collaborative Project on Serving Linguistically Diverse Seniors. Final Report.

    ERIC Educational Resources Information Center

    Burt, Miriam

    In 2002, the Center for Applied Linguistics (CAL) collaborated with the Senior Service Association (SSA) and the American Society on Aging (ASA) on a two-phase project to improve the effectiveness of ASA's sub-grantees in serving linguistically and culturally diverse populations. SSA provides subsidized employment for low-income seniors and funds…

  8. Project VITAL. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Ellison, Arthur

    In its third year of funding, Project VITAL (Volunteers In Training Act and Learn) was designed to provide literacy training to 500 librarians, coordinators, and volunteers working in literacy programs. Through the techniques of improvisational theater, structured scenarios were enacted dealing with illiteracy, women's concerns of domestic…

  9. Project ES '70 Training for Local Coordinators. Final Report.

    ERIC Educational Resources Information Center

    Jacobson, Majory E.

    The "organic curriculum" of the Educational System of the Seventies Project (ES '70) is one which integrates academic training, occupational training, and personal development in grades nine through 12 and which draws heavily on research dealing with individualized instruction. The program held at Kingsley Inn, Bloomfield Hills,…

  10. Final report of Project 617, the Energy Saver

    SciTech Connect

    1996-12-31

    The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

  11. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  12. Working Smart: The Los Angeles Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.

    The Working Smart workplace literacy project was sponsored by a public school district and several profit and nonprofit companies and conducted for the hotel and food industry in the Los Angeles area. Literacy instruction was merged with job requirements of the customer service job classifications. Videodisc courseware was developed, as were…

  13. BLOCK TEACHING PROJECT, INTEGRATING HUMANITIES AND SOCIAL SCIENCE, FINAL REPORT.

    ERIC Educational Resources Information Center

    KREISMAN, ARTHUR

    A BLOCK TEACHING PROJECT BRINGING TOGETHER 100 STUDENTS AND 7 FACULTY MEMBERS, COVERING 6 AREAS OF SUBJECT MATTER FOR A TOTAL OF 12 CREDIT HOURS PER QUARTER FOR 3 QUARTERS, WAS SET UP. THE SUBJECT MATTER WAS MADE UP OF HISTORY OF WESTERN CIVILIZATION (3 CREDIT HOURS PER QUARTER), WORLD LITERATURE (3 CREDIT HOURS PER QUARTER), ENGLISH COMPOSITION…

  14. Articulation for Allied Health. Final Report. Omnibus Dissemination Project.

    ERIC Educational Resources Information Center

    Havens, Cheryl C.

    There exists in health occupations education, two types of educational institutions. One type prepares students for a certificate, and the other for a degree. The objective of the Articulation Project for Allied Health was to establish and document a procedure by which students with technical certificates could receive college credit, recommending…

  15. FIPSE Interactive Physics Project (October 1989-August 1993). Final Report.

    ERIC Educational Resources Information Center

    Laws, Priscilla W.; Thornton, Ronald K.

    This project focused on encouraging instructors at large universities to take advantage of the curricular materials and computer tools developed for two related programs funded originally by FIPSE. In particular, it involved reworking and integrating materials developed for the previously funded Workshop Physics and Tools for Scientific Thinking…

  16. Project on Research in Student Learning. Final Report.

    ERIC Educational Resources Information Center

    Winkler, Donald R.

    This project researched three questions related to the production of cognitive skills in formal elementary and secondary education. The first question dealt with the pattern of student learning over time. It was found that, generally, the elasticity of grade eight knowledge with respect to grade eight school inputs is higher than the elasticity of…

  17. Technical Theatre Project. Final Report 1984-85.

    ERIC Educational Resources Information Center

    Meyer, George

    A project was conducted to enhance the vocational training program of approximately 300 students enrolled in carpentry/general building construction, electrical/electronics, and cosmetology courses by introducing them to possible career opportunities available in the technical theater field. The program was conducted through Somerset County and…

  18. Senior Citizens Project. Final Report 1984-85.

    ERIC Educational Resources Information Center

    Somerset County Vocational Technical Schools, Bridgewater, NJ.

    A program was undertaken to provide hands-on training to high school students enrolled in building trades programs. Students would plan and construct dwellings that would eventually be turned over to the local community services agency to be offered as rental units to low- and moderate-income senior citizens. The initial project was a one-story…

  19. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  20. The Oregon Vo-Tech Math Project. Final Report.

    ERIC Educational Resources Information Center

    Linn-Benton Community Coll., Albany, OR.

    Covering the time period of January 1974 to June 1975, the report describes the activities of an ongoing project to provide verbal problem sets for occupational math courses offered in Oregon community colleges and secondary schools. The problems were selected to provide the math skills necessary for job entry and performance in several…

  1. Understanding Equilibrium: The Study of Complex Systems. Final Project Report.

    ERIC Educational Resources Information Center

    Duckworth, Eleanor; And Others

    The Educational Technology Center (ETC) Complex Systems Project was initiated to explore ways of using computers to help students understand systems which have often proven too complex for most high school students to understand. Preliminary work concentrated on the cognitive processes involved in modeling simple systems. This paper describes an…

  2. Skills Conversion Project: Chapter 7, Power Resources. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The opportunity for employment of displaced aerospace and defense professionals within the electric power utility industry was investigated by the Seattle Skills Conversion Project Team of the National Society of Professional Engineers, as part of a study conducted for the U.S. Department of Labor. The study concluded that a possibility for…

  3. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    ERIC Educational Resources Information Center

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  4. Final Technical Report for Terabit-scale hybrid networking project.

    SciTech Connect

    Veeraraghavan, Malathi

    2015-12-12

    This report describes our accomplishments and activities for the project titled Terabit-Scale Hybrid Networking. The key accomplishment is that we developed, tested and deployed an Alpha Flow Characterization System (AFCS) in ESnet. It is being run in production mode since Sept. 2015. Also, a new QoS class was added to ESnet5 to support alpha flows.

  5. Adult Education School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    Gacka, Richard C.

    A project undertaken to determine the feasibility of integrating components of secondary-level tech prep and school-to-work programs into adult basic and literacy education (ABLE) programs. Applied academics curriculum materials developed by the Center for Occupational Research and Development (CORD) and the Agency for Instructional Technology…

  6. Parent Services Project Evaluation: Final Report of Findings.

    ERIC Educational Resources Information Center

    Stein, Alan R.; Haggard, Molly

    The Parent Services Project (PSP) is a family resource program which provides supportive activities for highly stressed and socially isolated parents based on the "social support as a stress-buffer" model of primary prevention. A PSP evaluation followed parents as they went through the PSP program and compared them with a matched control…

  7. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  8. DPI Equity Leadership Project--Phase III. Final Report.

    ERIC Educational Resources Information Center

    Riley, Linda L.

    During its third phase in 1993-94, the Wisconsin Department of Public Instruction (DPI) Gender Equity Leadership Project provided technical assistance and staff development experiences to the Wisconsin Vocational Equity Leadership Cadre (WVELC). The technical assistance/staff development component prepared the cadre to assist local districts in…

  9. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  10. Project 88: A New Technical Nursing Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Jorenby, Barbara; And Others

    A project was conducted in Minnesota: (1) to describe and document a new level of technical nursing appropriate for 1988 for people educated at less than baccalaureate level; (2) to identify exit competencies of graduates of new programs; and (3) to develop model curricula for new programs in Minnesota's adult vocational technical institutes,…

  11. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Implementing Agreement; Beech Ridge Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY... bat (Myotis sodalis) and Virginia big-eared bat (Corynorhinus townsendii virginianus) from construction, operation, maintenance, and decommissioning of the Beech Ridge Wind Power Project. Beech...

  12. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    SciTech Connect

    Ludwig, Dale; Hamilton, Jill

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  13. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  14. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  15. Near-Site Transportation Infrastructure Project. Final report

    SciTech Connect

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities.

  16. ICCS network simulation LDRD project final report summary

    SciTech Connect

    Bryant, B

    1999-01-09

    A critical component of the NIF Integrated Computer Controls System (ICCS) is the local area network (LAN) that enables timely and reliable communication between control applications running on the 600+ computer systems distributed throughout the NIF facility. This project analyzed critical portions of the NIF ICCS network (referred to as "the network" in this report) applying the OPNET Modeler discrete event simulation package to model and simulate network operation and the Network Associates Distributed Sniffer network analyzer to collect actual network performance data in the ICCS Testbed. These tools were selected and procured for use on this project. Simulations and initial network analysis indicate that the network is capable of meeting system requirements. ICCS application software is currently in development, so test software was used to collect performance data. As application software is tested in the Testbed environment, more accurate timing information can be collected which will allow for more accurate large-scale simulations.

  17. THz transceiver characterization : LDRD project 139363 final report.

    SciTech Connect

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph; Reno, John Louis; Fuller, Charles T.; Wendt, Joel Robert; Lee, Mark; Grine, Albert D.

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. In addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.

  18. Encoal mild coal gasification project: Final design modifications report

    SciTech Connect

    1997-07-01

    The design, construction and operation Phases of the Encoal Mild Coal Gasification Project have been completed. The plant, designed to process 1,000 ton/day of subbituminous Power River Basin (PRB) low-sulfur coal feed and to produce two environmentally friendly products, a solid fuel and a liquid fuel, has been operational for nearly five years. The solid product, Process Derived Fuel (PDF), is a stable, low-sulfur, high-Btu fuel similar in composition and handling properties to bituminous coal. The liquid product, Coal Derived Liquid (CDL), is a heavy, low-sulfur, liquid fuel similar in properties to heavy industrial fuel oil. Opportunities for upgrading the CDL to higher value chemicals and fuels have been identified. Significant quantities of both PDF and CDL have been delivered and successfully burned in utility and industrial boilers. A summary of the Project is given.

  19. Final project report: High energy rotor development, test and evaluation

    SciTech Connect

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  20. The Andromeda Project: Final Results of Citizen Science Cluster Identification

    NASA Astrophysics Data System (ADS)

    Seth, Anil; Johnson, L. C.; Wallace, M.; Dalcanton, J.; Kapadia, A.; Lintott, C.; Simpson, R.; Skillman, E. D.; PHAT Team; Andromeda Project Team

    2014-01-01

    The Panchromatic Hubble Andromeda Treasury (PHAT) survey has completed data collection, having taken over 30 billion pixels of imaging data of the Andromeda galaxy over four years using the Hubble Space Telescope. These data contain the largest sample of star clusters observable in any galaxy, including our own Milky Way. The Andromeda Project is a citizen science project that recruited over 10,000 volunteers to identify thousands of star clusters in the PHAT imaging. We present results culminating from two rounds of cluster searching and the properties of the resulting sample. We discuss catalog completeness results derived from synthetic cluster data. This cluster sample represents a significant advance in our ability to study star and cluster formation on galaxy wide scales. We are using the resulting cluster sample to provide the best available constraints on the high-mass initial mass function and the fraction of star formation that results in bound star clusters.

  1. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect

    Fillerup, Joseph M.

    1980-09-08

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  2. Framework for Adaptable Operating and Runtime Systems: Final Project Report

    SciTech Connect

    Patrick G. Bridges

    2012-02-01

    In this grant, we examined a wide range of techniques for constructing high-performance con gurable system software for HPC systems and its application to DOE-relevant problems. Overall, research and development on this project focused in three specifc areas: (1) software frameworks for constructing and deploying con gurable system software, (2) applcation of these frameworks to HPC-oriented adaptable networking software, (3) performance analysis of HPC system software to understand opportunities for performance optimization.

  3. Advanced exterior sensor project : final report, September 2004.

    SciTech Connect

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  4. The project for an energy-enriched curriculum: Final report

    SciTech Connect

    Not Available

    1984-01-01

    The Project for an Energy-Enriched Curriculum (PEEC) reported was a long-running effort at infusing energy/environment/economics (E/E/E) themes into the K-12 curriculum. While it was conducted as a single integrated effort by the National Science Teachers Association (NSTA), it is supported by a series of contracts and grants, during the period 1976 to 1984, from the Energy Research and Development Administration (ERDA) and the US Department of Energy (DOE).

  5. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    Samples Added weekly blank for organic-free deionized water and Collected in the Field. filter blank. Specific to Project. 5-9 5.5 Sample Custody Greater...Gmoundwater Monitoing Plan, VOLUME/i Filter blanks will be collected at a frequency of 1 per lot. Organic-free, deionized water will be run through the filter ...using the filtering apparatus used to filter groundwater samples. The water will be collected in the appropriate sample bottles following filtering

  6. Freihoelser Forst Local Training Area rehabilitation project. Final report

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J.

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project`s goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  7. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  8. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  9. Final Scientifc Report - Hydrogen Education State Partnership Project

    SciTech Connect

    Leon, Warren

    2012-02-03

    Under the leadership of the Department of Energy Hydrogen and Fuel Cells program, Clean Energy States Alliance (CESA) educated and worked with state leaders to encourage wider deployment of fuel cell and hydrogen technologies. Through outreach to state policymakers, legislative leaders, clean energy funds, energy agencies, and public utility commissions, CESA worked to accomplish the following objectives of this project: 1. Provide information and technical assistance to state policy leaders and state renewable energy programs in the development of effective hydrogen fuel cell programs. 2. Identify and foster hydrogen program best practices. 3. Identify and promote strategic opportunities for states and the Department of Energy (DOE) to advance hydrogen technology deployment through partnerships, collaboration, and targeted activities. Over the three years of this project, CESA, with our partner National Conference of State Legislatures (NCSL), was able to provide credible information on fuel cell policies, finance, and technical assistance to hundreds of state officials and other stakeholders. CESA worked with its membership network to effectively educate state clean energy policymakers, program managers, and decision makers about fuel cell and hydrogen technologies and the efforts by states to advance those technologies. With the assistance of NCSL, CESA gained access to an effective forum for outreach and communication with state legislators from all 50 states on hydrogen issues and policies. This project worked to educate policymakers and stakeholders with the potential to develop and deploy stationary and portable fuel cell technologies.

  10. Yakima Fisheries Project : Final Environmental Impact Statement : Summary.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  11. Space Human Factors Engineering Gap Analysis Project Final Report

    NASA Technical Reports Server (NTRS)

    Hudy, Cynthia; Woolford, Barbara

    2006-01-01

    Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

  12. 2009 ESMD Space Grant Faculty Project Final Report

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; Ghanashyam, Joshi; Guo, Jiang; Conrad, James; Bandyopadhyay, Alak; Cross, William

    2009-01-01

    The Constellation Program is the medium by which we will maintain a presence in low Earth orbit, return to the moon for further exploration and develop procedures for Mars exploration. The foundation for its presence and success is built by the many individuals that have given of their time, talent and even lives to help propel the mission and objectives of NASA. The Exploration Systems Mission Directorate (ESMD) Faculty Fellows Program is a direct contributor to the success of directorate and Constellation Program objectives. It is through programs such as the ESMD Space Grant program that students are inspired and challenged to achieve the technological heights that will propel us to meet the goals and objectives of ESMD and the Constellation Program. It is through ESMD Space Grant programs that future NASA scientists, engineers, and mathematicians begin to dream of taking America to newer heights of space exploration. The ESMD Space Grant program is to be commended for taking the initiative to develop and implement programs that help solidify the mission of NASA. With the concerted efforts of the Kennedy Space Center educational staff, the 2009 ESMD Space Grant Summer Faculty Fellows Program allowed faculty to become more involved with NASA personnel relating to exploration topics for the senior design projects. The 2009 Project was specifically directed towards NASA's Strategic Educational Outcome 1. In-situ placement of Faculty Fellows at the NASA field Centers was essential; this allowed personal interactions with NASA scientists and engineers. In particular, this was critical to better understanding the NASA problems and begin developing a senior design effort to solve the problems. The Faculty Fellows are pleased that the ESMD Space Grant program is taking interest in developing the Senior Design courses at the university level. These courses are needed to help develop the NASA engineers and scientists of the very near future. It has been a pleasure to be

  13. Industrial-electricity-conservation potential in the Pacific Northwest. Volume I. Final report

    SciTech Connect

    Lang, K.; Hinkle, B.K.

    1983-03-01

    The findings of an update of the assessment of industrial electricity conservation potential in the Pacific Northwest (PNW) completed in February 1982 are presented. Using a detailed process energy end use data base developed by SRC in an earlier study for BPA, conservation measures were identified for nine 4-digit SIC (Standard Industrial Classification) industries, representing the most energy intensive industries in each of the major industry groups in the PNW, in the February 1982 report. Assumptions associated with these measures were revised in response to comments from industry representatives in the PNW. An engineering-economic analysis was performed for each conservation measure. Based on the economic attractiveness of the measure relative to average hurdle rates (which are equivalent to the cost of equity) in each industry, estimates of the economic potential of each conservation measure were made. A market penetration model was then used to estimate the actual implementation of each measure over time. The conservation potential estimated for the 4-digit industries was extrapolated to the 2-digit level using an analysis of the end uses of electricity and a baseline forecast of industrial electricity requirements provided by BPA. Options for BPA and utility programs to encourage industrial electricity conservaton were identified and their costs and benefits were estimated.

  14. Snettisham Hydroelectric Project, Alaska second stage development, Crater lake. Final foundation report. Final report

    SciTech Connect

    Not Available

    1992-09-04

    The important geologic features and methods used to construct the Crater Lake stage of the Snettisham Hydroelectric project, built between 1985 and 1989, are discussed. The project added 31 megawatts of non-polluting, renewable electric power for Juneau, Alaska and the surrounding area. Features of the report include the power tunnel and access adits, penstock excavation, surge shaft, gate shaft and lake top. Construction aspects include the general geology, design features, construction methods, geologic conditions encountered, ground support requirements, grouting, instrumentation and tunnel filling. Foundation conditions for the Crater Lake status were excellent, permitting the power and penstock tunnel and shafts to be constructed essentially unlined. The basic rock type throughout the project is a high-quality, quartz diorite gneiss with randomly spaced, subparallel basalt dikes.... Unlined rock tunnels, Power tunnel, Penstocks, Lake tap, Surge shaft.

  15. An Interdisciplinary Approach to Training the Arrhythmic Child. Final Project Report and Addendum to Final Project Report.

    ERIC Educational Resources Information Center

    Liemohn, Wendell

    The final report and addendum document a 2-year study which examined the efficacy of a rhythmic training program to improve rhythmic skill in children with mild mental retardation or learning disabilities (year 1) or hearing impairments (year 2). The study was based on the writings of the Soviet neuropsychologist A. R. Luria suggesting the value…

  16. Final report for SNL/NM environmental drilling project

    SciTech Connect

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  17. Messiah College Biodiesel Fuel Generation Project Final Technical Report

    SciTech Connect

    Zummo, Michael M; Munson, J; Derr, A; Zemple, T; Bray, S; Studer, B; Miller, J; Beckler, J; Hahn, A; Martinez, P; Herndon, B; Lee, T; Newswanger, T; Wassall, M

    2012-03-30

    Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibility of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.

  18. SNOX demonstration project: Volume 1, Public design. Final report

    SciTech Connect

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration was conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. Testing at the site concluded in December of 1994. This report presents a description of the technology and design criteria for the demonstration plant including modifications and additions to the Ohio Edison Niles Station Unit 2. Pertinent drawings and a complete list of drawings are provided for information and reference. In addition to design information, cost data is provided for the design and construction of the demonstration plant; and cost estimates are provided for startup and operating expenses of the demonstration unit. The influence of commercial site specific conditions on the design and economics of the technology are also discussed.

  19. Hospital ventilation standards and energy conservation: chemical contamination of hospital air. Final report

    SciTech Connect

    Rainer, D.; Michaelsen, G.S.

    1980-03-01

    In an era of increasing energy conservation consciousness, a critical reassessment of the validity of hospital ventilation and thermal standards is made. If current standards are found to be excessively conservative, major energy conservation measures could be undertaken by rebalancing and/or modification of current HVAC systems. To establish whether or not reducing ventilation rates would increase airborne chemical contamination to unacceptable levels, a field survey was conducted to develop an inventory and dosage estimates of hospital generated airborne chemical contaminants to which patients, staff, and visitors are exposed. The results of the study are presented. Emphasis is on patient exposure, but an examination of occupational exposure was also made. An in-depth assessment of the laboratory air environment is documented. Housekeeping products used in survey hospitals, hazardous properties of housekeeping chemicals and probable product composition are discussed in the appendices.

  20. On-farm biogas systems information dissemination project. Final report

    SciTech Connect

    Campbell, J.K.; Koelsch, R.K.; Guest, R.W.; Fabian, E.

    1997-03-01

    The purpose of this project was to study how farmers manage anaerobic digesters on three New York State dairy farms. Two years of data collected were from both plug-flow and tower-type mixed-flow digesters at regular intervals over a three-year period revealed that the financial return from the energy produced by a biogass system in the late 1980`s is marginal. Little difficulty was experienced in operation of the anaerobic digester; however, several farms utilizing congeneration to convert biogas into electricity and heat suffered from not applying maintenance to the congenerator in a timely fashion.

  1. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  2. Wildlife Impact Assessment Palisades Project, Idaho, Final Report.

    SciTech Connect

    Sather-Blair, Signe

    1985-02-01

    The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

  3. Minimal Technologies Application Project, Hohenfels Training Area, Germany: Final report

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O. . Energy Systems Div.); Severinghaus, W.D. ); Brent, J.J. )

    1991-12-01

    At the US Army Hohenfels Training Area in Germany, more than 30 years of continuous and intensive tactical training has caused extensive environmental damage because of the loss of vegetative cover and accelerated soil erosion. A project was conducted to evaluate the cost-effectiveness and relative benefits of various revegetation procedures. These procedures involved amendment and seedbed preparation options that were combined with three different durations of site closure. The point-intercept method was used to measure the types and amounts of vegetation established and changes in the vegetative community. Over three growing seasons, applications of fertilizer and seed increased the percent grass, legume, and total vegetative cover. The duration of site closure had no influence on the types or amounts of ground cover established. Materials made up only 10% of the total cost of the fertilization and seeding operations. The results of the research indicate that less expensive methods of amendment application should be evaluated. The data also show that site closure is not practical, economical, or necessary. The results of this project suggest that a regular maintenance program consisting of seeding and fertilization is required to maintain adequate vegetative cover and control erosion on tactical training areas.

  4. Steamtown District Heating and Cooling Project, Scranton, Pennsylvania. Final report

    SciTech Connect

    1990-04-01

    This report summarizes the activities of a study intended to examine the feasibility of a district heating and cooling alternative for the Steamtown National Historic Site in Scranton, PA. The objective of the study was to investigate the import of steam from the existing district heating system in Scranton which is operated by the Community Central Energy Corporation and through the use of modern technology provide hot and chilled water to Steamtown for its internal heating and cooling requirements. Such a project would benefit Steamtown by introducing a clean technology, eliminating on-site fuel use, avoiding first costs for central heating and cooling plants and reducing operation and maintenance expenditures. For operators of the existing district heating system, this project represents an opportunity to expand their customer base and demonstrate new technologies. The study was conducted by Joseph Technology Corporation, Inc. and performed for the Community Central Energy Corporation through a grant by the US Department of Energy. Steamtown was represented by the National Park Service, the developers of the site.

  5. Green River Formation water flood demonstration project. Final report

    SciTech Connect

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. |; Deo, M.D.

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  6. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  7. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  8. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  9. 78 FR 42871 - Final Extension of Project Period and Waiver; Rehabilitation Continuing Education Program for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION 34 CFR Chapter III Final Extension of Project Period and Waiver; Rehabilitation Continuing Education Program for the Technical Assistance and Continuing Education Centers (TACE Centers)...

  10. 77 FR 70805 - Presquile National Wildlife Refuge, Chesterfield County, VA; Final Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... facilities, control invasive species, protect cultural resources, monitor for climate change impacts... changes associated with invasive species, global climate change, or storm events. We would promote natural... Comprehensive Conservation Plan and Finding of No Significant Impact AGENCY: Fish and Wildlife Service,...

  11. Programmed Instruction Manual for a New Solar and Energy Conservation Laboratory. Final Evaluation Report.

    ERIC Educational Resources Information Center

    State Univ. of New York, Farmingdale. Agricultural and Technical Coll.

    A programmed instruction course was developed, consisting of fifteen experiments encompassing eleven separate pieces of equipment operational in a solar and energy conservation lab. The programmed instruction manual for the lab was evaluated and revised during a workshop. This evaluation indicated that both the lab and manual are valuable tools…

  12. 77 FR 16556 - Kootenai National Wildlife Refuge, Boundary County, ID; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Westside Road, Bonners Ferry, ID 83805. In-Person Viewing or Pickup: Call (208) 267-3888 to make an... established under the Migratory Bird Conservation Act ``for use as an inviolate sanctuary, or for any other management purpose, for migratory birds.'' The refuge provides important habitat for waterbirds,...

  13. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    SciTech Connect

    Not Available

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  14. [The Southern Sierra Nevada continental dynamics project]. Final technical report

    SciTech Connect

    Clayton, R.W.; Saleeby, J.B.

    1997-12-16

    The main objective of this study was to determine whether or not the Southern Sierra Nevada Mountain Range is supported by a crustal root. A secondary goal was to evaluate the relationship between the Sierra Nevada Range and the adjoining Death Valley extensional province. As part of the project, two seismic profiles were executed. The first was a north-south profile running from Ridgecrest to Chafant Valley. The second was an east-west profile from Death Valley to Coalinga. An NPE shot was recorded on the east-west receiver line, and the data were analyzed by forward modeling with a staggered-grid finite-difference code. Concurrently, the authors initiated an in-depth study of lower crustal and upper mantle xenoliths hosted by Neogene volcanic rocks of the central and southern Sierra Nevada region. This initial work focused on thermobarometric estimates of representative xenolith samples aimed at understanding the vertical composition of the Sierra Nevada lithosphere.

  15. North Dakota Thunderstorm Project. Final report, April 1989-March 1991

    SciTech Connect

    Boe, B.A.

    1991-11-20

    The North Dakota Thunderstorm Project (NDTP) was a national scale research program conducted in central North Dakota during June and July, 1989. The program was hosted and coordinated by the North Dakota Atmospheric Resource Board, and funded jointly by the National Oceanic and Atmospheric Administration (NOAA), the State of North Dakota, and the National Science Foundation. Data collection with four Doppler radars, six aircraft, and a variety of supporting instrumentation began 12 June 1989, and continued through 22 July 1989. In all, 106 of the nineteen various predefined experiments were conducted, though severe storms were fewer in number than expected. Several different atmospheric tracer techniques were employed, including gaseous (sulfur hexafluoride), radar chaff, natural (ozone, carbon monoxide), and fluorescent beads.

  16. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect

    Miller, Kim

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  17. Compost-powered food drying project. Final report

    SciTech Connect

    Not Available

    1983-01-01

    Results of a study performed to demonstrate the use of heat generated from compost piles to dry food are presented. Results indicate that compost pile heat, the main source of heat for the dryer, performed rather erratically in past trials, but its positive effects on the environment merit more study. The increase in nitrogen fertilizer value of finished compost over the original materials ranged between 25% and 90%. This replaces nitrogen usually made with fossil fuels, without generating any known toxic effects on the surrounding environment. Bacteria are very efficient workers that can be harnessed to do certain tasks. Heating and producing nitrogen would be using the same bacteria to do two jobs efficiently. When too much heat is extracted from a pile, the bacteria cannot function efficiently and the pile cools down. Therefore there is only a limited amount of heat available for outside uses. This amount of heat is felt to be proportionate to pile size, so a larger pile could meet the heating demands of the dryer used in the project. Operator expertise is very critical in composting for heat and is effectively gained only through experience. Since the cost effectiveness of the operation depends on using waste materials available at the site, the operator must find the correct combination of these materials and combine them correctly. The length of time involved in fully composting materials and the seasonal limitations of the method combine to bring expertise to the operator only after years of composting. A positive side effect of the project has been the realization of the usefulness of the pre-made insulated box (used refrigerator truck body) in temperature controlled situations. It has proved to be a very cost effective and portable dryer.

  18. Final report and recommendations of the ESnet Authentication Pilot Project

    SciTech Connect

    Johnson, G.R.; Moore, J.P.; Athey, C.L.; Engert, D.E.; Ramus, J.E.

    1995-01-01

    To conduct their work, U.S. Department of Energy (DOE) researchers require access to a wide range of computing systems and information resources outside of their respective laboratories. Electronically communicating with peers using the global Internet has become a necessity to effective collaboration with university, industrial, and other government partners. DOE`s Energy Sciences Network (ESnet) needs to be engineered to facilitate this {open_quotes}collaboratory{close_quotes} while ensuring the protection of government computing resources from unauthorized use. Sensitive information and intellectual properties must be protected from unauthorized disclosure, modification, or destruction. In August 1993, DOE funded four ESnet sites (Argonne National Laboratory, Lawrence Livermore National Laboratory, the National Energy Research Supercomputer Center, and Pacific Northwest Laboratory) to begin implementing and evaluating authenticated ESnet services using the advanced Kerberos Version 5. The purpose of this project was to identify, understand, and resolve the technical, procedural, cultural, and policy issues surrounding peer-to-peer authentication in an inter-organization internet. The investigators have concluded that, with certain conditions, Kerberos Version 5 is a suitable technology to enable ESnet users to freely share resources and information without compromising the integrity of their systems and data. The pilot project has demonstrated that Kerberos Version 5 is capable of supporting trusted third-party authentication across an inter-organization internet and that Kerberos Version 5 would be practical to implement across the ESnet community within the U.S. The investigators made several modifications to the Kerberos Version 5 system that are necessary for operation in the current Internet environment and have documented other technical shortcomings that must be addressed before large-scale deployment is attempted.

  19. Final Report for Project. Quark matter under extreme conditions

    SciTech Connect

    Incera, Vivian; Ferrer, Efrain

    2015-12-31

    The results obtained in the two years of the grant have served to shine new light on several important questions about the phases of quantum chromodynamics (QCD) under extreme conditions that include quark matter at high density, as well quark-gluon plasma at high temperatures, both in the presence of strong magnetic fields. The interest in including an external magnetic field on these studies is motivated by the generation of large magnetic fields in off-central heavy-ion collisions and by their common presence in astrophysical compact objects, the two scenarios where the physics of quark matter becomes relevant. The tasks carried out in this DOE project led us, among other things, to discover the first connection between the physics of very dense quark matter and novel materials as for instance topological insulators and Weyl semimetals; they allowed us to find a physical explanation for and a solution to a standing puzzle in the apparent effect of a magnetic field on the critical temperature of the QCD chiral transition; and they led us to establish by the first time that the core of the observed two-solar-mass neutron stars could be made up of quark matter in certain inhomogeneous chiral phases in a magnetic field and that this was consistent with current astrophysical observations. A major goal established by the Nuclear Science Advisory committee in its most recent report “Reaching for the Horizon” has been “to truly understand how nuclei and strongly interacting matter in all its forms behave and can predict their behavior in new settings.” The results found in this DOE project have all contributed to address this goal, and thus they are important for advancing fundamental knowledge in the area of nuclear physics and for enhancing our understanding of the role of strong magnetic fields in the two settings where they are most relevant, neutron stars and heavy-ion collisions.

  20. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... project consists of a 100-turbine wind-powered electric generation facility located in an approximately 80... Wind for take of the Indiana bat, incidental to otherwise lawful activities in accordance with the HCP... Implementing Agreement and Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County,...

  1. Final EDP Ti: sapphire amplifiers for ELI project

    NASA Astrophysics Data System (ADS)

    Chvykov, Vladimir; Kalashnikov, Mikhail; Osvay, Károly

    2015-05-01

    Recently several ultrahigh intensity Chirped Pulse Amplification (CPA) laser systems have reached petawatt output powers [1, 2] setting the next milestone at tens or even hundreds petawatts for the next three to ten years [3, 4]. These remarkable results were reached when laser amplifiers (opposite to Optical Parametric Amplification (OPA) [5]) were used as final ones and from them Ti:Sapphire crystals supposed to be the working horses as well in the future design of these laser systems. Nevertheless, the main limitation that arises on the path toward ultrahigh output power and intensity is the restriction on the pumping and extraction energy imposed by Transverse Amplified Spontaneous Emission (TASE) [6] and/or transverse parasitic generation (TPG) [7] within the large aperture of the disc-shape amplifier volume.

  2. Final Definite Project Report and Final Environmental Assessment, Keystone Harbor Channel Deepening, Admiralty Inlet, Washington

    DTIC Science & Technology

    1991-10-01

    impacts are expected. DISTRIBUTION/AVAILABILITY OF ABSTRACT 21 ABSTRACT SECURITY CLASSIFICATION UNCLASSIFIED/UNLIMITED 0 SAME AS RPT. 03 DTIC USERS...would not increase the channel shoaling rate or the cost of regular maintenance dredging, o would have no significant impacts to environmental features...TABLE OF CONTENTS (cont.) ENVIRONMENTAL ASSESSMENT FINDING OF NO SIGNIFICANT IMPACT Number PLATES 1 Project Plan and Typical Cross-Section 2

  3. The Wichita Valley irrigation project: Joseph Kemp, boosterism, and conservation in northwest Texas, 1886-1939.

    PubMed

    Anderson, Jahue

    2011-01-01

    This is the story of failure: in this case, an irrigation project that never met its boosters' expectations. Between 1880 and 1930, Wichita Falls entrepreneur Joseph Kemp dreamed of an agrarian Eden on the Texas rolling plains. Kemp promoted reclamation and conservation and envisioned the Big Wichita River Valley as the "Irrigated Valley." But the process of bringing dams and irrigation ditches to the Big Wichita River ignored knowledge of the river and local environment, which ultimately was key to making these complex systems work. The boosters faced serious ecological limitations and political obstacles in their efforts to conquer water, accomplishing only parts of the grandiose vision. Ultimately, salty waters and poor drainage doomed the project. While the livestock industry survived and the oil business thrived in the subsequent decades, the dream of idyllic irrigated farmsteads slowly disappeared.

  4. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Fish and Wildlife Service Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive... Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR... years. ADDRESSES: Copies of the Final CCP and FONSI/EA may be viewed at the Swan Lake National...

  5. From GCM Output to Local Hydrologic and Ecological Impacts: Integrating Climate Change Projections into Conservation Lands

    NASA Astrophysics Data System (ADS)

    Weiss, S. B.; Micheli, L.; Flint, L. E.; Flint, A. L.; Thorne, J. H.

    2014-12-01

    Assessment of climate change resilience, vulnerability, and adaptation options require downscaling of GCM outputs to local scales, and conversion of temperature and precipitation forcings into hydrologic and ecological responses. Recent work in the San Francisco Bay Area, and California demonstrate a practical approach to this process. First, climate futures (GCM x Emissions Scenario) are screened using cluster analysis for seasonal precipitation and temperature, to select a tractable subset of projections that still represent the range of climate projections. Second, monthly climate projections are downscaled to 270m and the Basin Characterization Model (BCM) applied, to generate fine-scale recharge, runoff, actual evapotranspiration (AET), and climatic water deficit (CWD) accounting for soils, bedrock geology, topography, and local climate. Third, annual time-series are used to derive 30-year climatologies and recurrence intervals of extreme events (including multi-year droughts) at the scale of small watersheds and conservation parcels/networks. We take a "scenario-neutral" approach where thresholds are defined for system "failure," such as water supply shortfalls or drought mortality/vegetation transitions, and the time-window for hitting those thresholds is evaluated across all selected climate projections. San Francisco Bay Area examples include drought thresholds (CWD) for specific vegetation-types that identify leading/trailing edges and local refugia, evaluation of hydrologic resources (recharge and runoff) provided by conservation lands, and productivity of rangelands (AET). BCM outputs for multiple futures are becoming available to resource managers through on-line data extraction tools. This approach has wide applicability to numerous resource management issues.

  6. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  7. High/Scope Outreach Project. Final Report. October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    High/Scope Educational Research Foundation, Ypsilanti, MI.

    The final report reviews accomplishments of an outreach project designed to provide technical assistance and training to early childhood programs for handicapped children. The project features the Cognitively Oriented Preschool Curriculum, a developmental approach based on Piagetian theory and explained to build on the child's accomplishments. A…

  8. Life Skills for Adolescents Project. Final Report. September 1, 1985 through August 31, 1986.

    ERIC Educational Resources Information Center

    Dennis-Small, Lucretia

    This document contains the final report on the Life Skills for Adolescents Project in northwestern Texas. The report is in the form of a process evaluation of progress toward achieving the project goal of enabling adolescents leaving substitute care to be better prepared to manage their own lives. The report describes the efforts of the project…

  9. Combating Illiteracy among the Elderly: A Cost-Effective Strategy. Final Project Report.

    ERIC Educational Resources Information Center

    National Council on the Aging, Inc., Washington, DC.

    This final report of the Literacy Education for the Elderly Project (LEEP) provides a description and the results of the project designed to target literacy education to the older adult. The strategy of the two-year program, established in 27 sites nationwide, was to: (1) link the local level aging services network with the volunteer adult…

  10. Classrooms beyond School Walls for Grades K-12. Mamaroneck Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Mamaroneck Union Free School District 1, NY.

    This document contains two reports on the Classrooms beyond Walls Career Education Project conducted by the Mamaroneck Union Free School District and the Sound Consortium for grades K-12 in the 1975-76 school year. The final report summarizes the project's major objectives (increasing self-awareness and decision-making skills, training teachers in…

  11. Albuquerque Integration Model (AIM) Outreach Project. Final Performance Report, October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    Albuquerque Special Preschool, NM.

    This final report documents the accomplishments and activities of the Albuquerque Integration Model (AIM) Outreach Project, designed to stimulate the awareness of parents and health care and education professionals regarding serving young handicapped children in settings which include their nonhandicapped peers. Progress in 14 project objectives…

  12. Project SPRUCE, Special Program of Rehabilitation for Unemployment Compensation Exhaustees. Vol. 2. Supplement to Final Report.

    ERIC Educational Resources Information Center

    Dorkin, Murray; Solomon, Herman S.

    The supplement to the final report of Project SPRUCE (a program to increase the employability of insured workers who experience long-term unemployment and seem likely to exhaust their benefit rights) summarizes in detail the problems encountered in the administering of the project, the operational procedures followed, and the training program…

  13. 78 FR 45997 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Transportation Project in... Project, located in the City of Puyallup (Milepost 6.40) in Pierce County, Washington. The action by FHWA... traffic, which will accommodate the future SR 167 Extension interchange and removes the existing...

  14. Group and Individually Prescribed Instruction for Handicapped Children; Instructional Program Model. Final Project Report.

    ERIC Educational Resources Information Center

    Aberdeen Municipal Separate School District, MS.

    Presented is the final report of a 3-year project in which an instructional program model was developed and implemented with 103 educable mentally retarded and learning disabled children (6-to 10-years old) in three Mississippi schools. General objectives of the project are said to include development of an experimental special education model…

  15. Related Services Research Project To Support the Education of Students with Deaf-Blindness. Final Report.

    ERIC Educational Resources Information Center

    Giangreco, Michael F.

    This final report documents the activities and products of the Related Services Research Project to Support the Education of Students with Deaf Blindness, a four-year research project which was designed to define, implement, and evaluate a set of specific strategies that would result in effective special education and related service provision for…

  16. Final report on Project ESEPP (LEAP+) for the period January 1, 1996 - August 1, 1998

    SciTech Connect

    Henley, Vernard Jr.

    2000-03-10

    This is the final report for the Project to Enhance Student Science and Engineering Preparation at the Pre-College Level (Project ESEPP) for the period from January 1, 1996 through August 1, 1998. This report summarizes the accomplishments of the program and its ability to meet the objectives described in the original proposal (1990).

  17. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  18. Aberdeen Area Final Evaluation Report, ESEA Title I Projects, Fiscal Year 1976.

    ERIC Educational Resources Information Center

    Bureau of Indian Affairs (Dept. of Interior), Aberdeen, SD. Aberdeen Area Office.

    The final evaluation report on the 37 Elementary Secondary Education Act (ESEA) Title I projects in the Bureau of Indian Affairs (BIA) Aberdeen Area, this report presents graphic and tabular descriptions for each of the 37 projects re: (1) Title I expenditures (graphic display of expenditures for reading, math, language, administration, area…

  19. California Confederation on Inclusive Education. Statewide Systems Change Project Final Report, 1995-2001.

    ERIC Educational Resources Information Center

    California State Univ., Los Angeles.

    This final report describes the accomplishments and activities of a 5-year federally funded California systems change project supporting the development and replication of inclusive schools as part of the state's movement to provide the least restrictive educational environment for all students with severe disabilities. The project was a…

  20. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitations on Claims for.... 139(l)(1). The actions relate to the proposed Route 79/I-195 Interchange Project in Fall...

  1. Final Undergraduate Project in Engineering: Towards More Efficient and Effective Tutorials.

    ERIC Educational Resources Information Center

    Popov, Atanas A.

    2003-01-01

    Presents strategies for improving the quality of student learning in the context of a final undergraduate project in mechanical engineering. Assesses outcomes of changing practice and shows that careful selection of project topics, good balanced groups, and individual tutorials stimulating peer interaction can foster a deep approach to learning.…

  2. 76 FR 55157 - Final Public Meeting in Washington, DC for the Proposed Keystone XL Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... Public Meeting in Washington, DC for the Proposed Keystone XL Project AGENCY: Department of State. ACTION: Notice of final public meeting in Washington, DC for the proposed Keystone XL project. SUMMARY: Following..., DC. Friday, October 7, 2011 Ronald Reagan Building and International Trade Center, Atrium Hall,...

  3. Final Report: Weatherization and Energy Conservation Education and Home Energy and Safety Review in the Aleutian Islands

    SciTech Connect

    Bruce Wright

    2011-08-30

    Aleutian/Pribilof Islands Association, Inc. (APIA) hired three part-time local community members that desire to be Energy Technicians. The energy technicians were trained in methods of weatherization assistance, energy conservation and home safety. They developed a listing of homes in the region that required weatherization, and conducted on-site weatherization and energy conservation education and a home energy and safety reviews in the communities of Akutan, False Pass, King Cove and Nelson Lagoon. Priority was given to these smaller communities as they tend to have the residences most in need of weatherization and energy conservation measures. Local residents were trained to provide all three aspects of the project: weatherization, energy conservation education and a home energy and safety review. If the total energy saved by installing these products is a 25% reduction (electrical and heating, both of which are usually produced by combustion of diesel fuel), and the average Alaska home produces 32,000 pounds of CO2 each year, so we have saved about: 66 homes x 16 tons of CO2 each year x .25 = 264 tons of CO2 each year.

  4. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  5. Advanced Large Area Plastic Scintillator Project (ALPS): Final Report

    SciTech Connect

    Jordan, David V.; Reeder, Paul L.; Todd, Lindsay C.; Warren, Glen A.; McCormick, Kathleen R.; Stephens, Daniel L.; Geelhood, Bruce D.; Alzheimer, James M.; Crowell, Shannon L.; Sliger, William A.

    2008-02-05

    The advanced Large-Area Plastic Scintillator (ALPS) Project at Pacific Northwest National Laboratory investigated possible technological avenues for substantially advancing the state-of-the-art in gamma-ray detection via large-area plastic scintillators. The three predominant themes of these investigations comprised the following: * Maximizing light collection efficiency from a single large-area sheet of plastic scintillator, and optimizing hardware event trigger definition to retain detection efficiency while exploiting the power of coincidence to suppress single-PMT "dark current" background; * Utilizing anti-Compton vetoing and supplementary spectral information from a co-located secondary, or "Back" detector, to both (1) minimize Compton background in the low-energy portion of the "Front" scintillator's pulse-height spectrum, and (2) sharpen the statistical accuracy of the front detector's low-energy response prediction as impelmented in suitable energy-windowing algorithms; and * Investigating alternative materials to enhance the intrinsic gamma-ray detection efficiency of plastic-based sensors.

  6. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect

    Not Available

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  7. Biomass Burning Observation Project (BBOP) Final Campaign Report

    SciTech Connect

    Kleinman, LI; Sedlacek, A. J.

    2016-01-01

    The Biomass Burning Observation Project (BBOP) was conducted to obtain a better understanding of how aerosols generated from biomass fires affect the atmosphere and climate. It is estimated that 40% of carbonaceous aerosol produced originates from biomass burning—enough to affect regional and global climate. Several biomass-burning studies have focused on tropical climates; however, few campaigns have been conducted within the United States, where millions of acres are burned each year, trending to higher values and greater climate impacts because of droughts in the West. Using the Atmospheric Radiation Measurement (ARM) Aerial Facility (AAF), the BBOP deployed the Gulfstream-1 (G-1) aircraft over smoke plumes from active wildfire and agricultural burns to help identify the impact of these events and how impacts evolve with time. BBOP was one of very few studies that targeted the near-field time evolution of aerosols and aimed to obtain a process-level understanding of the large changes that occur within a few hours of atmospheric processing.

  8. Final project report, staff exchange with Finnigan Corporation

    SciTech Connect

    Edmonds, C.G.

    1993-08-01

    The objective of the exchange between Pacific Northwest Laboratory (PNL) and Finnigan Corporation is a transfer of expertise and technology for the design and operation of efficient and sensitive atmospheric pressure/vacuum electrospray ionization (ESI) sources. The development of such ion sources will permit wider application of mass spectrometry instrumentation in applied studies in a variety of disciplines including clinical, forensic, biochemical, biotechnical, and environmental studies where sensitivity is a paramount concern. Two meetings were held between representatives of Finnigan Corporation (led by Dr. Ian Jardine, Director for Marketing, Finnigan Corporation) and PNL staff members. During these meetings, Finnigan and PNL staff surveyed the existing technology for atmosphere/vacuum interface of mass spectrometry to ESI. The representatives from Finnigan viewed demonstrations of recent developments that increased efficiency and sensitivity for ESI mass spectrometry. During these meetings, knowledge and expertise were shared in the development of instrumentation, methods, and applications of ESI mass spectrometry with particular emphasis on current and planned Finnigan instrumentation. With the objective of more effective and competitive products for Finnigan Corporation, concepts for a Cooperative Research and Development Agreement (CRADA) were directed toward the development and commercialization of advanced high efficiency and sensitivity ESI technology. A detailed proposal and work plan for the cooperative project was developed and is included in this report.

  9. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  10. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  11. Final report for the Advanced Natural Gas Vehicle Project

    SciTech Connect

    John Wozniak

    1999-02-16

    The project objective was to develop the technologies necessary to prototype a dedicated compressed natural gas (CNG) powered, mid-size automobile with operational capabilities comparable to gasoline automobiles. A system approach was used to design and develop the engine, gas storage system and vehicle packaging. The 2.4-liter DOHC engine was optimized for natural gas operation with high-compression pistons, hardened exhaust valves, a methane-specific catalytic converter and multi-point gaseous injection. The chassis was repackaging to increase space for fuel storage with a custom-designed, cast-aluminum, semi-trailing arm rear suspension system, a revised flat trunk sheet-metal floorpan and by equipping the car with run-flat tires. An Integrated Storage system (ISS) was developed using all-composite, small-diameter cylinders encapsulated within a high-strength fiberglass shell with impact-absorbing foam. The prototypes achieved the target goals of a city/highway driving range of 300 miles, ample trunk capacity, gasoline vehicle performance and ultra low exhaust emissions.

  12. Final summary report on project 3310 marine diesel exhaust emissions (alternative fuels). Final report

    SciTech Connect

    Bentz, A.P.

    1997-09-01

    This report summarizes the results of a 5-year study to ascertain the magnitude of emission problems from Coast Guard and commercial vessels; to develop methodology applicable for use on small vessels by using portable emission analyzers, and to examine various potential means of reducing excessive emissions. During this project, the Coast Guard RD Center tested eight vessels (of six types); and the Volpe National Transportation Systems Center tested six Coast Guard vessels (of five types) operating on the West Coast. Of the 14 vessels tested, eight were found to exceed the proposed NOx limits, although some by very small amounts.

  13. Pataha Creek Model Watershed : January 2000-December 2002 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    2003-04-01

    The projects outlined in detail on the attached project reports were implemented from calendar year 2000 through 2002 in the Pataha Creek Watershed. The Pataha Creek Watershed was selected in 1993, along with the Tucannon and Asotin Creeks, as model watersheds by NPPC. In previous years, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and were the main focus of the implementation phase of the watershed plan. These practices were the main focus of the watershed plan to reduce the majority of the sediment entering the stream. Prior to 2000, several bank stabilization projects were installed but the installation costs became prohibitive and these types of projects were reduced in numbers over the following years. The years 2000 through 2002 were years where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. The Pataha Creek has steelhead in the upper reaches and native and planted rainbow trout in the mid to upper portion. Suckers, pikeminow and shiners inhabit the lower portion because of the higher water temperatures and lack of vegetation. The improvement of riparian habitat will improve habitat for the desired fish species. The lower portion of the Pataha Creek could eventually develop into spawning and rearing habitat for chinook salmon if some migration barriers are removed and habitat is restored. The upland projects completed during 2000 through 2002 were practices that reduce erosion from the cropland. Three-year continuous no-till projects were finishing up and the monitoring of this particular practice is ongoing. Its direct impact on soil erosion along with the economical aspects is being studied. Other practices such as terrace, waterway, sediment

  14. 78 FR 51205 - Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... energy projects (i.e., particularly wind energy) on the refuge. CCP Alternatives, Including Our Preferred... implement annual surveys for resident and migratory birds, and establish additional populations of...

  15. High Performance Building Facade Solutions - PIER Final Project Report

    SciTech Connect

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  16. Final report on LDRD project : advanced optical trigger systems.

    SciTech Connect

    Roose, Lars D.; Hadley, G. Ronald; Mar, Alan; Serkland, Darwin Keith; Geib, Kent Martin; Sullivan, Charles Thomas; Keeler, Gordon Arthur; Bauer, Thomas M.; Peake, Gregory Merwin; Loubriel, Guillermo Manuel; Montano, Victoria A.

    2008-09-01

    are difficult to scale and manufacture with the required uniformity. As a promising alternative to multiple discrete edge-emitting lasers, a single wafer of vertical-cavity surface-emitting lasers (VCSELs) can be lithographically patterned to achieve the desired layout of parallel line-shaped emitters, in which adjacent lasers utilize identical semiconductor material and thereby achieve a degree of intrinsic optical uniformity. Under this LDRD project, we have fabricated arrays of uncoupled circular-aperture VCSELs to approximate a line-shaped illumination pattern, achieving optical fill factors ranging from 2% to 30%. We have applied these VCSEL arrays to demonstrate single and dual parallel line-filament triggering of PCSS devices. Moreover, we have developed a better understanding of the illumination requirements for stable triggering of multiple-filament PCSS devices using VCSEL arrays. We have found that reliable triggering of multiple filaments requires matching of the turn-on time of adjacent VCSEL line-shaped-arrays to within approximately 1 ns. Additionally, we discovered that reliable triggering of PCSS devices at low voltages requires more optical power than we obtained with our first generation of VCSEL arrays. A second generation of higher-power VCSEL arrays was designed and fabricated at the end of this LDRD project, and testing with PCSS devices is currently underway (as of September 2008).

  17. Recovery heat exchange to conserve energy in wood drying. Final report

    SciTech Connect

    Rosen, H.N.

    1985-06-01

    The North Central Forest Experiment Station of the Forest Service has had an ongoing program since 1974 to conserve energy in wood drying without reducing wood quality. We have suggested ways to conserve energy, developed new drying techniques which were less energy intensive than conventional methods, and investigated recovery of vent stream energy with bench-scale heat exchangers. This study is a culmination of our efforts to conserve energy in lumber drying by vent stream recovery in a conventional dry kiln. An experimental 600 bf kiln was fitted with a recovery heat exchanger to utilize the vent stream from a 100 bf prototype pressure steam dryer. Four runs were conducted, two with green yellow-poplar in both the kiln and pressure steam dryer, and two with air-dried red oak in the kiln and green silver maple in the pressure steam dryer. The dryers were instrumented so that air and steam temperatures, pressures, steam rates, electrical consumption, and humidity could be monitored on a periodic basis. Determinations of lumber physical characteristics before and after drying were made so that changes in quality of the lumber as a result of drying could be determined.

  18. The Carolina Bay Restoration Project - Final Report 2000-2006.

    SciTech Connect

    Barton, Christopher

    2007-12-15

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

  19. Final Report of the HyPER Harvester Project

    SciTech Connect

    Prasad, Nadipuram R; Ranade, Satishkuma J

    2015-11-30

    The HyPER Harvester Project resulted in the first full­scale design, fabrication and testing of two vertical­axis harvester prototypes at the Elephant Butte Irrigation District Drop 8 Station in Southern New Mexico. The design, followed by fabrication, and deployment clearly demonstrated the feasibility to manufacture and deploy harvester prototypes at low cost. While several issues common to irrigation canal systems have to be overcome, the electromechanical performance of the integrated turbine­generator system demonstrated proof­of­concept. Proof­of­concept includes 1) feasibility for using additive manufacturing techniques to fabricate Carbon­composite turbine­generator components at low cost, 2) ease of transportation and deployment, and 3) the harvester performance. The benefits of modularity were demonstrated in terms of rapid deployment at the Drop 8 Station. Scalability and adaptability were proven in terms of the custom­fitting characteristics that enabled rapid deployment. While keeping the same shape and form, the harvester can be easily adapted to any drop environment. Self­supporting ability makes the harvester design minimally intrusive on existing structures. There are two technical challenges ahead that have to be addressed. Irregular flow patterns in canal flow induce vertical oscillations due to pressure change across the impeller. Despite the nosecone in conventional Kaplan turbine design that ordinarily dampens oscillations, an effective coupling design is required to eliminate the hydrodynamic effect on the generating system. In arid areas where tumbleweed is present, a robust design to prevent trash entering the drop is required. The compact shape and form have an aesthetic appearance and appear to illustrate an environmentally friendly attribute. The systems­engineered design enables rapid manufacturing and assembly of desired size units that can be deployed at sites along U.S. waterways as small hydropower plants. There is

  20. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  1. Western Cretaceous Coal Seam Project. Final project summary. Final topical report, 1 January 1988-31 August 1989 (research)

    SciTech Connect

    Mavor, M.J.; Close, J.C.

    1989-12-31

    A summary of the Western Cretaceous Coal Seam project conclusions and data collection efforts is presented in the report. The discussion includes a summary of the geologic, formation evaluation, and stimulation analyses of four major wells. The names operators and locations of these wells are: Hamilton No. 3, Mesa Operating Limited Partnership, San Juan Co. NM, Sec. 30, Twn. 32 N, Rng. 10 W; Northeast Blanco Unit No. 403, Blackwood Nichols Co., Ltd, Rio Arriba Co. NM, Sec. 9, Twn. 30 N, Rng. 7 W; Southern Ute - Mobil 36-1, McKenzie Methane Co., LaPlata Co. CO, Sec. 36, Twn 34 N, Rng. 10 W; and Colorado 32-7 No. 9, Mobil Oil Corp., LaPlata Co, CO, Sec. 4, Twn. 32 N, Rng. 7 W. The discussion includes a summary of 7 minor well efforts in addition to the above major efforts.

  2. Integrating Science and Land Management for the Conservation Effects Assessment Project (CEAP) in Southwestern Rangelands

    NASA Astrophysics Data System (ADS)

    Goodrich, D. C.; Heilman, P.; Nearing, M.; Speath, K.; Hernandez, M.; Wei, H.; Holifield-Collins, C.; Kautz, M.; Nichols, M.; Barlow, J.; Guertin, P.; Burns, S.; Stone, J. J.; Weltz, M.; Metz, L.; Norfleet, L.; Duriancik, L.; Johnson, M.

    2013-12-01

    Farm Bill legislation enacted by Congress in 2002 directed the U.S. Department of Agriculture to assess of the benefits and efficacy of conservation practices provided by a variety of USDA programs. Benefits include improved agricultural production, reduction of erosion and associated nutrient losses, improved water quality, improved soil resilience, and improved habitat among others. To conduct the assessment, the USDA initiated CEAP or the Conservation Effects Assessment Project in 2003, which included a national assessment complemented by small watershed studies. The national assessment started in eastern and midwestern cultivated croplands and has now progressed to western rangelands. This presentation will discuss the challenges of assessing the effects of rangeland conservation practices in a period of unusually hot and dry climatic conditions in the Cienega Creek Watershed (CCW) located southeast of Tucson, Arizona. As is common in the western U.S., the CCW consists of a patchwork of private and public lands in the west with much of the public lands leased for grazing cattle. The watershed also has high recreational value and provides many ecosystem services, including wildlife habitat qualities and flood protection to Tucson. A combination of monitoring, modeling, and remote sensing was utilized in the assessment. Conservation spending in the watershed ramped up in 1997. However, the 16-year period from 1997-2012 contains almost half of the 23 driest seasons (lowest 20 percentile) from the 117-year observed precipitation record. Initial results indicate that Landsat remotely sensed images can be effectively used to estimate both green and senescent canopy cover. This enabled detection of the impacts of drought and changes in canopy cover from practices such as prescribed fire and mechanical brush removal. Cienega Creek Watershed - Land Ownership

  3. BPA Instream Habitat Projects Completed within Asotin Creek Watershed, 1999-2001 Final Report.

    SciTech Connect

    Johnson, Bradley J.

    2002-10-23

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority WRIA in southeastern WA. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve, because no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps Members have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, southeastern Washington had been dealing with endangered fall and spring chinook salmon since 1994. The Asotin Creek In-Stream Habitat Project teamed BPA and Governor's Salmon Recovery Funding on four instream habitat projects in the Asotin Creek Watershed. These projects provide complex instream habitat for steelhead, bull trout and spring chinook in the stream. 38 pools were

  4. Final Results From the Circumarctic Lakes Observation Network (CALON) Project

    NASA Astrophysics Data System (ADS)

    Hinkel, K. M.; Arp, C. D.; Eisner, W. R.; Frey, K. E.; Grosse, G.; Jones, B. M.; Kim, C.; Lenters, J. D.; Liu, H.; Townsend-Small, A.

    2015-12-01

    Since 2012, the physical and biogeochemical properties of ~60 lakes in northern Alaska have been investigated under CALON, a project to document landscape-scale variability of Arctic lakes in permafrost terrain. The network has ten nodes along two latitudinal transects extending inland 200 km from the Arctic Ocean. A meteorological station is deployed at each node and six representative lakes instrumented and continuously monitored, with winter and summer visits for synoptic assessment of lake conditions. Over the 4-year period, winter and summer climatology varied to create a rich range of lake responses over a short period. For example, winter 2012-13 was very cold with a thin snowpack producing thick ice across the region. Subsequent years had relatively warm winters, yet regionally variable snow resulted in differing gradients of ice thickness. Ice-out timing was unusually late in 2014 and unusually early in 2015. Lakes are typically well-mixed and largely isothermal, with minor thermal stratification occurring in deeper lakes during calm, sunny periods in summer. Lake water temperature records and morphometric data were used to estimate the ground thermal condition beneath 28 lakes. Application of a thermal equilibrium steady-state model suggests a talik penetrating the permafrost under many larger lakes, but lake geochemical data do not indicate a significant contribution of subpermafrost groundwater. Biogeochemical data reveal distinct spatial and seasonal variability in chlorophyll biomass, chromophoric dissolved organic carbon (CDOM), and major cations/anions. Generally, waters sampled beneath ice in April had distinctly higher concentrations of inorganic solutes and methane compared with August. Chlorophyll concentrations and CDOM absorption were higher in April, suggesting significant biological/biogeochemical activity under lake ice. Lakes are a positive source of methane in summer, and some also emit nitrous oxide and carbon dioxide. As part of the

  5. Mississippi Ethanol Gasification Project, Final Scientific / Technical Report

    SciTech Connect

    Pearson, Larry, E.

    2007-04-30

    The Mississippi Ethanol (ME) Project is a comprehensive effort to develop the conversion of biomass to ethanol utilizing a proprietary gasification reactor technology developed by Mississippi Ethanol, LLC. Tasks were split between operation of a 1/10 scale unit at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) of Mississippi State University (MSU) and the construction, development, and operation of a full scale pilot unit located at the ME facility in Winona, Mississippi. In addition to characterization of the ME reactor gasification system, other areas considered critical to the operational and economic viability of the overall ME concept were evaluated. These areas include syngas cleanup, biological conversion of syngas to alcohol, and effects of gasification scale factors. Characterization of run data from the Pre-Pilot and Pilot Units has allowed development of the factors necessary for scale-up from the small unit to the larger unit. This scale range is approximately a factor of 10. Particulate and tar sampling gave order of magnitude values for preliminary design calculations. In addition, sampling values collected downstream of the ash removal system show significant reductions in observed loadings. These loading values indicate that acceptable particulate and tar loading rates could be attained with standard equipment additions to the existing configurations. Overall operation both the Pre-Pilot and Pilot Units proceeded very well. The Pilot Unit was operated as a system, from wood receiving to gas flaring, several times and these runs were used to address possible production-scale concerns. Among these, a pressure feed system was developed to allow feed of material against gasifier system pressure with little or no purge requirements. Similarly, a water wash system, with continuous ash collection, was developed, installed, and tested. Development of a biological system for alcohol production was conducted at Mississippi State University with

  6. Blade System Design Study. Part II, final project report (GEC).

    SciTech Connect

    Griffin, Dayton A.

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its being

  7. NEET Micro-Pocket Fission Detector. Final Project report

    SciTech Connect

    Unruh, T.; Rempe, Joy; McGregor, Douglas; Ugorowski, Philip; Reichenberger, Michael; Ito, Takashi; Villard, J. -F.

    2014-09-01

    measure the flux and temperature profiles in the reactor. This report summarizes the status at the end of year two of this three year project. As documented in this report, all planned accomplishments for developing this unique new, compact, multipurpose sensor have been completed.

  8. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    SciTech Connect

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  9. Characterization of the radon source in North-Central Florida. Final report part 1 -- Final project report; Final report part 2 -- Technical report

    SciTech Connect

    1997-12-01

    This report contains two separate parts: Characterization of the Radon Source in North-Central Florida (final report part 1 -- final project report); and Characterization of the Radon Source in North-Central Florida (technical report). The objectives were to characterize the radon 222 source in a region having a demonstrated elevated indoor radon potential and having geology, lithology, and climate that are different from those in other regions of the U.S. where radon is being studied. Radon availability and transport in this region were described. Approaches for predicting the radon potential of lands in this region were developed.

  10. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  11. Volcanism Studies: Final Report for the Yucca Mountain Project

    SciTech Connect

    Bruce M. Crowe; Frank V. Perry; Greg A. Valentine; Lynn M. Bowker

    1998-12-01

    This report synthesizes the results of volcanism studies conducted by scientists at the Los Alamos National Laboratory and collaborating institutions on behalf of the Department of Energy's Yucca Mountain Project. An assessment of the risk of future volcanic activity is one of many site characterization studies that must be completed to evaluate the Yucca Mountain site for potential long-term storage of high-level radioactive waste. The presence of several basaltic volcanic centers in the Yucca Mountain region of Pliocene and Quaternary age indicates that there is a finite risk of a future volcanic event occurring during the 10,000-year isolation period of a potential repository. Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Future volcanic events cannot be predicted with certainty but instead are estimated using formal methods of probabilistic volcanic hazard assessment (PVHA). Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The distribution, eruptive history, and geochronology of Plio-Quaternary basalt centers are described by individual center emphasizing the younger postcaldera basalt (<5 Ma). The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. The age of the Lathrop Wells center is now confidently determined to be about 75 thousand years old. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. The Crater Flat volcanic zone is

  12. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    SciTech Connect

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions favorable for a fish

  13. The OCCUPAC Project (A Project to Develop Occupational Information Learning Activity Packages for Grades K-9). Final Report.

    ERIC Educational Resources Information Center

    Peterson, Marla; And Others

    During Phase I of a two-phase project, 15 OCCUPACS (learning activity packages) were developed, pilot tested in a university laboratory school, field tested in four public school systems, revised, and submitted to professionals for final review. Intended to provide occupational information to children in Grades K-9 at different levels of…

  14. Project Continuity: A Handicapped Children's Early Education Project. Final Report, October 1, 1986 to September 30, 1989.

    ERIC Educational Resources Information Center

    Jackson, Barbara; Quinn, Judy

    The final report describes Project Continuity, a federally funded effort to provide continuity of care for handicapped infants with chronic illness or complex medical needs while in the acute care setting and to facilitate transition of the infant into the home environment. Goals were accomplished within the context of a family-centered…

  15. Project BELIEVE. Final Report. (A National Workplace Literacy Project with Bakery Europa and Straub Clinic & Hospital).

    ERIC Educational Resources Information Center

    Zane, Lawrence F. H.

    Bakery Europa and the Straub Clinic in Hawaii participated in Project BELIEVE, a 3-year (1995-98) workplace literacy project conducted in partnership with the University of Hawaii's College of Education. Instruction focused on the literacy, communication, interpersonal, and problem-solving skills needed to succeed in the baking and health care…

  16. THE OREGON EDUCATIONAL TELEVISION PROJECT, 1959 TO 1963. EDUCATIONAL TELEVISION PROJECT, FINAL REPORT.

    ERIC Educational Resources Information Center

    SHEPHERD, JOHN R.

    THE FOUR MAJOR EFFORTS OF THE OREGON EDUCATIONAL TELEVISION PROJECT WERE SUMMARIZED. THE REPORT (1) RECOUNTED THE HISTORY OF THE RESEARCH EFFORT, (2) SUMMARIZED THE SECONDARY SCHOLARLY PRODUCTS OF THE PROJECT, (3) ABSTRACTED RELATED PRELIMINARY REPORTS, AND (4) PROVIDED GENERALIZATIONS BASED ON DATA COLLECTED DURING THE COURSE OF THE STUDY…

  17. Passive solar design strategies: Remodeling guidelines for conserving energy at home. [Final report

    SciTech Connect

    Not Available

    1991-12-31

    The idea of passive solar is simple, but applying it effectively does require information and attention to the details of design and construction. Some passive solar techniques are modest and low-cost, and require only small changes in remodeler`s typical practice. At the other end of the spectrum, some passive solar systems can almost eliminate a house`s need for purchased heating (and in some cases, cooling) energy -- but probably at a relatively high first cost. In between are a broad range of energy-conserving passive solar techniques. Whether or not they are cost-effective, practical and attractive enough to offer a market advantage to any individual remodeler depends on very specific factors such as local costs, climate, and market characteristics. Passive solar design strategies: Remodeling Guidelines For Conserving Energy At Homes is written to help give remodelers the information they need to make these decisions. Passive Solar Design Strategies is a package in three basic parts: The Guidelines contain information about passive solar techniques and how they work, and provides specific examples of systems which will save various percentages of energy; The Worksheets offer a simple, fill-in-the-blank method to pre-evaluate the performance of a specific design; The Worked Example demonstrates how to complete the worksheets for a typical residence.

  18. Conservation status of polar bears (Ursus maritimus) in relation to projected sea-ice declines.

    PubMed

    Regehr, Eric V; Laidre, Kristin L; Akçakaya, H Resit; Amstrup, Steven C; Atwood, Todd C; Lunn, Nicholas J; Obbard, Martyn; Stern, Harry; Thiemann, Gregory W; Wiig, Øystein

    2016-12-01

    Loss of Arctic sea ice owing to climate change is the primary threat to polar bears throughout their range. We evaluated the potential response of polar bears to sea-ice declines by (i) calculating generation length (GL) for the species, which determines the timeframe for conservation assessments; (ii) developing a standardized sea-ice metric representing important habitat; and (iii) using statistical models and computer simulation to project changes in the global population under three approaches relating polar bear abundance to sea ice. Mean GL was 11.5 years. Ice-covered days declined in all subpopulation areas during 1979-2014 (median -1.26 days year(-1)). The estimated probabilities that reductions in the mean global population size of polar bears will be greater than 30%, 50% and 80% over three generations (35-41 years) were 0.71 (range 0.20-0.95), 0.07 (range 0-0.35) and less than 0.01 (range 0-0.02), respectively. According to IUCN Red List reduction thresholds, which provide a common measure of extinction risk across taxa, these results are consistent with listing the species as vulnerable. Our findings support the potential for large declines in polar bear numbers owing to sea-ice loss, and highlight near-term uncertainty in statistical projections as well as the sensitivity of projections to different plausible assumptions.

  19. Conservation status of polar bears (Ursus maritimus) in relation to projected sea-ice declines

    PubMed Central

    Akçakaya, H. Resit; Amstrup, Steven C.; Atwood, Todd C.; Lunn, Nicholas J.; Obbard, Martyn; Stern, Harry; Thiemann, Gregory W.; Wiig, Øystein

    2016-01-01

    Loss of Arctic sea ice owing to climate change is the primary threat to polar bears throughout their range. We evaluated the potential response of polar bears to sea-ice declines by (i) calculating generation length (GL) for the species, which determines the timeframe for conservation assessments; (ii) developing a standardized sea-ice metric representing important habitat; and (iii) using statistical models and computer simulation to project changes in the global population under three approaches relating polar bear abundance to sea ice. Mean GL was 11.5 years. Ice-covered days declined in all subpopulation areas during 1979–2014 (median −1.26 days year−1). The estimated probabilities that reductions in the mean global population size of polar bears will be greater than 30%, 50% and 80% over three generations (35–41 years) were 0.71 (range 0.20–0.95), 0.07 (range 0–0.35) and less than 0.01 (range 0–0.02), respectively. According to IUCN Red List reduction thresholds, which provide a common measure of extinction risk across taxa, these results are consistent with listing the species as vulnerable. Our findings support the potential for large declines in polar bear numbers owing to sea-ice loss, and highlight near-term uncertainty in statistical projections as well as the sensitivity of projections to different plausible assumptions. PMID:27928000

  20. 76 FR 78939 - James Campbell National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Fish and Wildlife Service James Campbell National Wildlife Refuge, Honolulu County, HI; Final... Highway, Room 2C, Hale`iwa, HI 96712. In-Person Viewing or Pickup: O`ahu National Wildlife Refuge Complex, 66-590 Kamehameha Highway, Room 2C, Hale`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David...