[Discipline construction is the theme of the development of burn surgery].
Jia, C Y
2018-03-20
Discipline construction is the core element of department development, including discipline structure setting, scale, equipment, medical workers structure, clinical feature and advantage, talent training, teaching level, scientific research level, management system, and cultural construction of department. As leader and engine of discipline construction, directors' ability is an important factor for discipline construction. Clinical characteristic is the basis of discipline construction; innovation actuation is the essence of discipline construction; talents training is the guarantee of discipline construction; scientific research is the wing of discipline construction; cultural construction is the hot spring of discipline construction. Discipline construction is the theme of the development of burn surgery.
Potential of Progressive Construction Systems in Slovakia
NASA Astrophysics Data System (ADS)
Kozlovska, Maria; Spisakova, Marcela; Mackova, Daniela
2017-10-01
Construction industry is a sector with rapid development. Progressive technologies of construction and new construction materials also called modern methods of construction (MMC) are developed constantly. MMC represent the adoption of construction industrialisation and the use of prefabrication of components in building construction. One of these modern methods is also system Varianthaus, which is based on, insulated concrete forms principle and provides complete production plant for wall, ceiling and roof elements for a high thermal insulation house construction. Another progressive construction system is EcoB, which represents an insulated precast concrete panel based on combination of two layers, insulation and concrete, produced in a factory as a whole. Both modern methods of construction are not yet known and wide-spread in the Slovak construction market. The aim of this paper is focused on demonstration of MMC using potential in Slovakia. MMC potential is proved based on comparison of the selected parameters of construction process - construction costs and construction time. The subject of this study is family house modelled in three material variants - masonry construction (as a representative of traditional methods of construction), Varianthaus and EcoB (as the representatives of modern methods of construction). The results of this study provide the useful information in decision-making process for potential investors of construction.
Perspectives of construction robots
NASA Astrophysics Data System (ADS)
Stepanov, M. A.; Gridchin, A. M.
2018-03-01
This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.
Construction Biotechnology: a new area of biotechnological research and applications.
Stabnikov, Viktor; Ivanov, Volodymyr; Chu, Jian
2015-09-01
A new scientific and engineering discipline, Construction Biotechnology, is developing exponentially during the last decade. The major directions of this discipline are selection of microorganisms and development of the microbially-mediated construction processes and biotechnologies for the production of construction biomaterials. The products of construction biotechnologies are low cost, sustainable, and environmentally friendly microbial biocements and biogrouts for the construction ground improvement. The microbial polysaccharides are used as admixtures for cement. Microbially produced biodegradable bioplastics can be used for the temporarily constructions. The bioagents that are used in construction biotechnologies are either pure or enrichment cultures of microorganisms or activated indigenous microorganisms of soil. The applications of microorganisms in the construction processes are bioaggregation, biocementation, bioclogging, and biodesaturation of soil. The biotechnologically produced construction materials and the microbially-mediated construction technologies have a lot of advantages in comparison with the conventional construction materials and processes. Proper practical implementations of construction biotechnologies could give significant economic and environmental benefits.
Hamid, Yasir; Mahmood, Sajid
2010-03-01
This review highlights the need in the Pakistani medical education system for teachers and students to be able to: define constructive feedback; provide constructive feedback; identify standards for constructive feedback; identify a suitable model for the provision of constructive feedback and evaluate the use of constructive feedback. For the purpose of literature review we had defined the key word glossary as: feedback, constructive feedback, teaching constructive feedback, models for feedback, models for constructive feedback and giving and receiving feedback. The data bases for the search include: Medline (EBSCO), Web of Knowledge, SCOPUS, TRIP, ScienceDirect, Pubmed, U.K. Pubmed Central, ZETOC, University of Dundee Library catalogue, SCIRUS (Elsevier) and Google Scholar. This article states that the Pakistani medical schools do not reflect on or use the benefits of the constructive feedback process. The discussion about constructive feedback suggests that in the context of Pakistan, constructive feedback will facilitate the teaching and learning activities.
CW Measurement System. Software System Maintenance Manual.
1982-04-02
37 2-7 Amplitude of Transformed Input Wave ............. 39 6-1 Flowchart of the IF-THEN-ELSE Construct ...... 99 6-2 Flowchart of FOR...Construct ................... 100 6-3 Flowchart of REPEAT Construct ................ 101 6-4 Flowchart of WHILE Construct ................. 102 6-5... Flowchart of CASEOF Construct ................ 103 6-6 Flowchart of PROCEDURE Construct ................ 104 6-7 Flowchart of PROGRAM Construct
7 CFR 1780.61 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...
7 CFR 1780.67 - Performing construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Performing construction. 1780.67 Section 1780.67..., Constructing and Inspections § 1780.67 Performing construction. Owners are encouraged to accomplish construction through contracts with qualified contractors. Owners may accomplish construction by using their...
7 CFR 1780.67 - Performing construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Performing construction. 1780.67 Section 1780.67..., Constructing and Inspections § 1780.67 Performing construction. Owners are encouraged to accomplish construction through contracts with qualified contractors. Owners may accomplish construction by using their...
7 CFR 1780.61 - Construction contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...
77 FR 1780 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
... development--design and construction. Site utilities--design and construction. Stormwater facilities--design and construction. Airside/apron--design and construction. Landside/roadway--design and construction. General aviation terminal/apron--design and construction. Airport beacon relocation--design and...
7 CFR 1753.77 - Methods of minor construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction... Contract Form 773, “Miscellaneous Construction Work and Maintenance Services”, by RUS Contract Form 515, or by work order construction. The rules for using Form 515 for minor construction are contained in...
48 CFR 915.404-4-71-6 - Fee base.
Code of Federal Regulations, 2014 CFR
2014-10-01
... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...
48 CFR 22.804-2 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...
48 CFR 22.804-2 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...
48 CFR 22.804-2 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...
46 CFR 160.054-3 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...
48 CFR 22.804-2 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...
46 CFR 160.054-3 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...
46 CFR 160.054-3 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...
46 CFR 160.054-3 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...
Human Factors Simulation in Construction Management Education
ERIC Educational Resources Information Center
Jaeger, M.; Adair, D.
2010-01-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…
NASA Technical Reports Server (NTRS)
Schwencke, D
1930-01-01
English airplane construction is presented with a particular emphasis on metal construction techniques. Steel rib and fuselage construction are discussed as well as the use of duralumin in construction.
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
7 CFR 1753.77 - Methods of minor construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Methods of minor construction. 1753.77 Section 1753..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.77 Methods of minor construction. Minor construction may be performed by contract using RUS...
7 CFR 1753.80 - Minor construction procedure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Minor construction procedure. 1753.80 Section 1753.80... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.80 Minor construction procedure. (a) If the borrower performs minor construction financed with loan funds, the borrower...
7 CFR 1753.82 - Minor construction closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Minor construction closeout. 1753.82 Section 1753.82... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.82 Minor construction closeout. (a) For minor construction inspected by the borrower's engineer, an original and two...
7 CFR 1753.82 - Minor construction closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Minor construction closeout. 1753.82 Section 1753.82... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.82 Minor construction closeout. (a) For minor construction inspected by the borrower's engineer, an original and two...
Research on construction quality and improvement of assembly construction
NASA Astrophysics Data System (ADS)
Cheng, Fei
2017-11-01
Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.
[Ecological demonstration activity and eco-civilization construction mode: review and prospects].
Mao, Hui-ping; He, Xuan; He, Jia; Niu, Dong-jie; Bao, Cun-kuan
2013-04-01
Ecological civilization is to normalize human development behaviors to harmonize the relationships between social and ecological development and eco-environment protection. In this paper, a comparative analysis was made on the ecological demonstration activities of ecological demonstration areas led by the Ministry of Environmental Protection, exemplar cities of national environmental protection, and ecological provinces, cities, and counties. It was considered that all the ecological demonstration activities had the problems of lacking pertinence of construction goals, disordered construction subjects, inefficient construction processes, and lacking continuous incentive mechanisms of assessment. In the meantime, through the analysis of the connotations of eco-civilization, the relationships between eco-civilization and eco-demonstration constructions were approached, and the eco-civilization construction mode was put forward in terms of construction goal, construction subject, and construction processes and assessment. The construction mode included the construction goal based on regional characteristics; the synergistic cooperation of construction subjects, the expanding ways of public participation, and the establishment of evaluation system for comprehensively measuring the 'actions and results'.
Validating MEDIQUAL Constructs
NASA Astrophysics Data System (ADS)
Lee, Sang-Gun; Min, Jae H.
In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.
Griffiths, Jamie T; Taheri, Arash; Day, Robert E; Yates, Piers J
2015-12-01
The aim of this study was to biomechanically evaluate the Locking attachment plate (LAP) construct in comparison to a Cable plate construct, for the fixation of periprosthetic femoral fractures after cemented total hip arthroplasty. Each construct incorporated a locking compression plate with bi-cortical locking screws for distal fixation. In the Cable construct, 2 cables and 2 uni-cortical locking screws were used for proximal fixation. In the LAP construct, the cables were replaced by a LAP with 4 bi-cortical locking screws. The LAP construct was significantly stiffer than the cable construct under axial load with a bone gap (P=0.01). The LAP construct offers better axial stiffness compared to the cable construct in the fixation of comminuted Vancouver B1 proximal femoral fractures. Crown Copyright © 2015. Published by Elsevier Inc. All rights reserved.
Fatal falls in the U.S. residential construction industry.
Dong, Xiuwen Sue; Wang, Xuanwen; Largay, Julie A; Platner, James W; Stafford, Erich; Cain, Chris Trahan; Choi, Sang D
2014-09-01
Falls from heights remain the most common cause of workplace fatalities among residential construction workers in the United States. This paper examines patterns and trends of fall fatalities in U.S. residential construction between 2003 and 2010 by analyzing two large national datasets. Almost half of the fatalities in residential construction were from falls. In the residential roofing industry, 80% of fatalities were from falls. In addition, about one-third of fatal falls in residential construction were among self-employed workers. Workers who were older than 55 years, were Hispanic foreign-born, or employed in small establishments (1-10 employees) also had higher proportions of fatal falls in residential construction compared to those in nonresidential construction. The findings suggest that fall safety within the residential construction industry lags behind commercial construction and industrial settings. Fall prevention in residential construction should be enhanced to better protect construction workers in this sector. © 2014 Wiley Periodicals, Inc.
Structures and construction of nuclear power plants on lunar surface
NASA Astrophysics Data System (ADS)
Shimizu, Katsunori; Kobatake, Masuhiko; Ogawa, Sachio; Kanamori, Hiroshi; Okada, Yasuhiko; Mano, Hideyuki; Takagi, Kenji
1991-07-01
The best structure and construction techniques of nuclear power plants in the severe environments on the lunar surface are studied. Facility construction types (functional conditions such as stable structure, shield thickness, maintainability, safety distances, and service life), construction conditions (such as construction methods, construction equipment, number of personnel, time required for construction, external power supply, and required transportation) and construction feasibility (construction method, reactor transportation between the moon and the earth, ground excavation for installation, loading and unloading, transportation, and installation, filling up the ground, electric power supply of plant S (300 kW class) and plant L (3000 kW class)) are outlined. Items to pay attention to in construction are (1) automation and robotization of construction; (2) cost reduction by multi functional robots; and (3) methods of supplying power to robots. A precast concrete block manufacturing plant is also outlined.
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
23 CFR 660.113 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false New construction. 18.423... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... facility is readily accessible to and usable by handicapped persons, if the construction was commenced...
50 CFR 29.21-5 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
50 CFR 29.21-5 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...
10 CFR 1040.73 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
23 CFR 660.113 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...
10 CFR 1040.73 - New construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...
50 CFR 29.21-5 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 1 2012-10-01 2012-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...
23 CFR 660.113 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...
23 CFR 660.113 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...
50 CFR 29.21-5 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
23 CFR 660.113 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...
50 CFR 29.21-5 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...
27 CFR 555.207 - Construction of type 1 magazines.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Fabricated metal wall construction. Metal wall construction is to consist of sectional sheets of steel or... constructed of, or covered with, a nonsparking material. (3) Wood frame wall construction. The exterior of... necessary for ventilation. (ii) A fabricated metal roof constructed of 3/16-inch plate steel lined with four...
27 CFR 555.207 - Construction of type 1 magazines.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Fabricated metal wall construction. Metal wall construction is to consist of sectional sheets of steel or... constructed of, or covered with, a nonsparking material. (3) Wood frame wall construction. The exterior of... necessary for ventilation. (ii) A fabricated metal roof constructed of 3/16-inch plate steel lined with four...
NASA Astrophysics Data System (ADS)
Liu, Chen; Tang, Guang-Rui; Jiang, Ming; Dong, Yu-Ming
2017-09-01
According to the practical situation of stringing construction for Ultra High Voltage (UHV) overhead transmission line, construction technology standardization of primary guide rope laying by multi-rotor aircraft is studied. This paper mainly focuses on the construction preparation, test flight and technology of laying primary guide rope. The summary of the construction technology standardization of primary guide rope laying by multi-rotor aircraft in stringing construction are useful in further guiding practical construction of transmission line.
Sturges, Beverly K; Kapatkin, Amy S; Garcia, Tanya C; Anwer, Cona; Fukuda, Shimpei; Hitchens, Peta L; Wisner, Tristan; Hayashi, Kei; Stover, Susan M
2016-04-01
To compare the stiffness, angular deformation, and mode of failure of lumbar vertebral column constructs stabilized with bilateral pins and polymethylmethacrylate (Pin-PMMA) or with a unilateral (left) locking compression plate (LCP) with monocortical screws. Ex vivo biomechanical, non-randomized. Cadaveric canine thoracolumbar specimens (n=16). Thoracolumbar (T13-L3) vertebral specimens had the L1-L2 vertebral motion unit stabilized with either Pin-PMMA or LCP. Stiffness in flexion, extension, and right and left lateral bending after nondestructive testing were compared between intact (pretreated) specimens and Pin-PMMA, and LCP constructs. The Pin-PMMA and LCP constructs were then tested to failure in flexion and left lateral bending. Both the Pin-PMMA and LCP constructs had reduced range of motion at the stabilized L1-L2 vertebral motion unit compared to intact specimens. The Pin-PMMA constructs had less range of motion for the flexion elastic zone than LCP constructs. The Pin-PMMA constructs were stiffer than intact specimens in flexion, extension, and lateral bending, and stiffer than LCP constructs in flexion and left lateral bending. The Pin-PMMA constructs had less angular deformation at construct yield and lower residual deformation at L1-L2 than LCP constructs after destructive testing to failure in flexion. The Pin-PMMA constructs were stiffer, stronger, and had less deformation at yield than LCP constructs after destructive testing to failure in lateral bending. Most constructs failed distant to the implant and fixation site. Pin-PMMA constructs had greater lumbar vertebral stiffness and reduced ROM than LCP constructs; however, both Pin-PMMA and LCP constructs were stronger than intact specimens. © Copyright 2016 by The American College of Veterinary Surgeons.
NASA Astrophysics Data System (ADS)
Zhu, Zhi gang
2017-12-01
This paper develops a research method on the construction of the first pile in the process of the construction on an urban expressway under complicated conditions, such as the difference between the underground conditions and the exploration results,the sand formation,the whole weathered and the rich groundwater. We study the relevant technical parameters and construction organization through construction of the first pile. The results show that construction on the first pile is very important under complicated conditions and can provide a basis to continuously improve the level of the whole pile foundation construction technology, and ultimately determine the entire project feasible construction program and the successful completion of the construction project.
An Overview of Total Quality Management (TQM) practice in Construction Sector
NASA Astrophysics Data System (ADS)
Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed
2018-04-01
In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.
25 CFR 170.472 - What construction records must tribes and BIA keep?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false What construction records must tribes and BIA keep? 170... Construction and Construction Monitoring § 170.472 What construction records must tribes and BIA keep? The following table shows which IRR construction records BIA and tribes must keep and the requirements for...
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...
NASA Astrophysics Data System (ADS)
Qin, Minwu
2018-05-01
With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
Upcoming Purchasing and Subcontracting Opportunities | NREL
Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples
Mechanisation and automation technologies development in work at construction sites
NASA Astrophysics Data System (ADS)
Sobotka, A.; Pacewicz, K.
2017-10-01
Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.
NASA Astrophysics Data System (ADS)
Wang, Meihua; Li, Rongshuai; Zhang, Wenze
2017-11-01
Multi-function construction platforms (MCPs) as an “old construction technology, new application” of the building facade construction equipment, its efforts to reduce labour intensity, improve labour productivity, ensure construction safety, shorten the duration of construction and other aspects of the effect are significant. In this study, the functional analysis of the multi-function construction platforms is carried out in the construction of the assembly building. Based on the general finite element software ANSYS, the static calculation and dynamic characteristics analysis of the MCPs structure are analysed, the simplified finite element model is constructed, and the selection of the unit, the processing and solution of boundary are under discussion and research. The maximum deformation value, the maximum stress value and the structural dynamic characteristic model are obtained. The dangerous parts of the platform structure are analysed, too. Multiple types of MCPs under engineering construction conditions are calculated, so as to put forward the rationalization suggestions for engineering application of the MCPs.
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
Implementation guidance for accelerated bridge construction in South Dakota
DOT National Transportation Integrated Search
2017-09-01
A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
Analytic Causative Constructions in Medieval Spanish: The Origins of a Construction
ERIC Educational Resources Information Center
Sanaphre Villanueva, Monica
2011-01-01
The goal of this study is to provide an inventory of the Analytic Causative constructions that were in use in Peninsular Spanish from the 12th to the 16th centuries from the constructional perspective of Cognitive Grammar. A detailed profile of each construction was made including its constructional schema along with relevant semantic, syntactic,…
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Yi, Wen; Miao, Mengyi; Zhang, Lei
2018-01-01
The construction industry has been recognized, for many years, as among those having a high likelihood of accidents, injuries and occupational illnesses. Such risks of construction workers can lead to low productivity and social problems. As a result, construction workers’ well-being should be highly addressed to improve construction workers’ efficiency and productivity. Meanwhile, the social support from a social network and capital (SNC) of construction workers has been considered as an effective approach to promote construction workers’ physical and mental health (P&M health), as well as their work efficiency and productivity. Based on a comprehensive literature review, a conceptual model, which aims to improve construction workers’ efficiency and productivity from the perspective of health and SNC, was proposed. A questionnaire survey was conducted to investigate the construction workers’ health, SNC and work efficiency and productivity in Nanjing, China. A structural equation model (SEM) was employed to test the three hypothetical relationships among construction workers’ P&M health, SNC and work efficiency and productivity. The results indicated that the direct impacts from construction workers’ P&M health on work efficiency and productivity were more significant than that from the SNC. In addition, the construction workers’ social capital and the network can indirectly influence the work efficiency and productivity by affecting the construction workers’ P&M health. Therefore, strategies for enhancing construction workers’ efficiency and productivity were proposed. Furthermore, many useable suggestions can be drawn from the research findings from the perspective of a government. The identified indicators and relationships would contribute to the construction work efficiency and productivity assessment and health management from the perspective of the construction workers. PMID:29462861
Yuan, Jingfeng; Yi, Wen; Miao, Mengyi; Zhang, Lei
2018-02-15
The construction industry has been recognized, for many years, as among those having a high likelihood of accidents, injuries and occupational illnesses. Such risks of construction workers can lead to low productivity and social problems. As a result, construction workers' well-being should be highly addressed to improve construction workers' efficiency and productivity. Meanwhile, the social support from a social network and capital (SNC) of construction workers has been considered as an effective approach to promote construction workers' physical and mental health (P&M health), as well as their work efficiency and productivity. Based on a comprehensive literature review, a conceptual model, which aims to improve construction workers' efficiency and productivity from the perspective of health and SNC, was proposed. A questionnaire survey was conducted to investigate the construction workers' health, SNC and work efficiency and productivity in Nanjing, China. A structural equation model (SEM) was employed to test the three hypothetical relationships among construction workers' P&M health, SNC and work efficiency and productivity. The results indicated that the direct impacts from construction workers' P&M health on work efficiency and productivity were more significant than that from the SNC. In addition, the construction workers' social capital and the network can indirectly influence the work efficiency and productivity by affecting the construction workers' P&M health. Therefore, strategies for enhancing construction workers' efficiency and productivity were proposed. Furthermore, many useable suggestions can be drawn from the research findings from the perspective of a government. The identified indicators and relationships would contribute to the construction work efficiency and productivity assessment and health management from the perspective of the construction workers.
NASA Astrophysics Data System (ADS)
Ng, L. S.; Tan, L. W.; Seow, T. W.
2017-11-01
The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.
How Can Lean Construction Improve the Daily Schedule of A Construction Manager?
NASA Astrophysics Data System (ADS)
Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin
2017-10-01
The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2011 CFR
2011-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2014 CFR
2014-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2012 CFR
2012-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2013 CFR
2013-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
NASA Technical Reports Server (NTRS)
Miller, K.; Davis, E. E.
1977-01-01
Construction and transportation systems and operations are described for the following combinations: (1) silicon photovoltaic CR=1 satellite constructed primarily in low earth orbit (LEO); (2) silicon photovoltaic CR=1 satellite constructed in geosynchronous earth orbit (GEO); (3) Rankine thermal engine satellite constructed primarily in LEO; and (4) Rankine thermal engine satellite constructed in GEO.
Inspection of Construction Works According to Polish Construction Law
NASA Astrophysics Data System (ADS)
Czemplik, A.
2015-11-01
Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.
An introduction to niche construction theory.
Laland, Kevin; Matthews, Blake; Feldman, Marcus W
Niche construction refers to the modification of selective environments by organisms. Theoretical and empirical studies of niche construction are increasing in importance as foci in evolutionary ecology. This special edition presents theoretical and empirical research that illustrates the significance of niche construction to the field. Here we set the scene for the following papers by (1) discussing the history of niche construction research, (2) providing clear definitions that distinguish niche construction from related concepts such as ecosystem engineering and the extended phenotype, (3) providing a brief summary of the findings of niche construction research, (4) discussing the contribution of niche construction and ecological inheritance to (a) expanded notions of inheritance, and (b) the extended evolutionary synthesis, and (5) briefly touching on some of the issues that underlie the controversies over niche construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 8 2012-10-01 2012-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 8 2014-10-01 2014-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 8 2011-10-01 2011-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 8 2013-10-01 2013-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...
7 CFR 1924.259 - Handling dwelling construction complaints.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Handling dwelling construction complaints. 1924.259... OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.259 Handling dwelling construction complaints. This section describes the procedure...
Developing a validation for environmental sustainability
NASA Astrophysics Data System (ADS)
Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nawi, Mohd Nasrun Mohd; Aziz, Zulkifli
2016-08-01
One of the agendas for addressing environmental protection in construction is to reduce impacts and make the construction activities more sustainable. This important consideration has generated several research interests within the construction industry, especially considering the construction damaging effects on the ecosystem, such as various forms of environmental pollution, resource depletion and biodiversity loss on a global scale. Using Partial Least Squares-Structural Equation Modeling technique, this study validates environmental sustainability (ES) construct in the context of large construction firms in Malaysia. A cross-sectional survey was carried out where data was collected from Malaysian large construction firms using a structured questionnaire. Results of this study revealed that business innovativeness and new technology are important in determining environmental sustainability (ES) of the Malaysian construction firms. It also established an adequate level of internal consistency reliability, convergent validity and discriminant validity for each of this study's constructs. And based on this result, it could be suggested that the indicators for organisational innovativeness dimensions (business innovativeness and new technology) are useful to measure these constructs in order to study construction firms' tendency to adopt environmental sustainability (ES) in their project execution.
Liu, Jingkuang; Gong, Enqin; Wang, Dong; Lai, XiaoHong; Zhu, Jian
2018-05-21
With the spread of the concept of sustainable development, people have gained awareness about the problem of massive illegal dumping of construction waste. In this research, a questionnaire survey was carried out in the USA and China. The results indicated the following. (1) Workers in both the countries had positive minimisation attitudes, and the attitude of Chinese construction workers was not significantly different from that of American construction workers. Furthermore, their average values were 3.9 and 4.07, respectively. (2) Business owners had a poor understanding of the obligations that should be fulfilled by contractors and construction workers, which greatly reduced (a) construction workers' and contractors' motivation to implement waste minimisation management and (b) the benefit-driven effect. (3) In terms of perceived behavioural control, Chinese construction workers had poorer minimisation technologies and knowledge than American construction workers, and it was very difficult for them to implement construction waste minimisation. The research conclusions and relevant suggestions may be used to improve the construction waste minimisation behaviour and awareness of Chinese people and promote China's construction waste minimisation management.
4D modeling in high-rise construction
NASA Astrophysics Data System (ADS)
Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly
2018-03-01
High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.
48 CFR 236.275 - Construction of industrial resources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Construction of industrial... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 236.275 Construction of industrial resources. See...
48 CFR 236.275 - Construction of industrial resources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Construction of industrial... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 236.275 Construction of industrial resources. See...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...
NASA Technical Reports Server (NTRS)
Benson, H.; Jenkins, L. M.
1981-01-01
The construction, operation, and maintenance requirements for a solar power satellite, including the space and ground systems, are reviewed. The basic construction guidelines are explained, and construction location options are discussed. The space construction tasks, equipment, and base configurations are discussed together with the operations required to place a solar power satellite in geosynchronous orbit. A rectenna construction technique is explained, and operation with the grid is defined. Maintenance requirements are summarized for the entire system. Key technology issues required for solar power satellite construction operations are defined.
3D Modeling as Method for Construction and Analysis of Graphic Objects
NASA Astrophysics Data System (ADS)
Kheyfets, A. L.; Vasilieva, V. N.
2017-11-01
The use of 3D modeling when constructing and analyzing perspective projections and shadows is considered. The creation of photorealistic image is shown. The perspective of the construction project and characterization of its image are given as an example. The authors consider the construction of a dynamic block as a means of graphical information storage and automation of geometric constructions. The example of the dynamic block construction at creating a truss node is demonstrated. The constructions are considered as applied to the Auto-CAD software. The paper is aimed at improving the graphic methods of architectural design and improving the educational process when training the Bachelor’s degree students majoring in construction.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
NASA Astrophysics Data System (ADS)
Alekseeva, Tatyana
2017-10-01
The article considers the contradictive nature of the basic cycles of the growth in construction, the core of which are construction cycles, replenishment cycles of the active part of fixed assets, innovation and investment cycles. All of the listed cycles objectively thwart the science and technology progress in construction. There are presented results of the study of finance leasing as an effective tool, that provides time reduction of the innovation replenishment cycle of the active part of fixed assets in construction. It takes into account the development and implementation terms of construction investment projects in order to timely support the innovation wave and enhance its efficiency in construction for a rapid transition of the construction investment complex and national economy to a new vector of growth.
NASA Astrophysics Data System (ADS)
Zhadanovsky, Boris; Sinenko, Sergey
2018-03-01
Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2014 CFR
2014-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2012 CFR
2012-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2013 CFR
2013-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2011 CFR
2011-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
This factsheet introduces CHP and its benefits to architects and engineers, and summarizes how CHP is treated under the LEED® for Building Design and Construction: New Construction and Major Renovations (LEED BD+C: New Construction) rating system.
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
10 CFR 4.128 - New construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...
45 CFR 1170.33 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 3 2014-10-01 2014-10-01 false New construction. 1170.33 Section 1170.33 Public... ASSISTED PROGRAMS OR ACTIVITIES Accessibility § 1170.33 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...
46 CFR 163.003-13 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 163.003-13 Section 163.003-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL CONSTRUCTION Pilot Ladder § 163.003-13 Construction. (a) General. Each pilot ladder...
10 CFR 4.128 - New construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 63.31 Section 63.31 Energy... REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization... part, the Commission may authorize construction of a geologic repository operations area at the Yucca...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...
45 CFR 1170.33 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false New construction. 1170.33 Section 1170.33 Public... ASSISTED PROGRAMS OR ACTIVITIES Accessibility § 1170.33 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...
46 CFR 163.003-13 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 163.003-13 Section 163.003-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL CONSTRUCTION Pilot Ladder § 163.003-13 Construction. (a) General. Each pilot ladder...
46 CFR 163.003-13 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 163.003-13 Section 163.003-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL CONSTRUCTION Pilot Ladder § 163.003-13 Construction. (a) General. Each pilot ladder...
45 CFR 1170.33 - New construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 3 2012-10-01 2012-10-01 false New construction. 1170.33 Section 1170.33 Public... ASSISTED PROGRAMS OR ACTIVITIES Accessibility § 1170.33 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
46 CFR 163.003-13 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 163.003-13 Section 163.003-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL CONSTRUCTION Pilot Ladder § 163.003-13 Construction. (a) General. Each pilot ladder...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
12 CFR 561.30 - Nonresidential construction loan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.30 Nonresidential construction loan. The term nonresidential construction loan means a loan for construction of other than one or more dwelling units. ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Nonresidential construction loan. 561.30...
Assessing the sustainable construction of large construction companies in Malaysia
NASA Astrophysics Data System (ADS)
Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd
2016-08-01
Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.
NASA Astrophysics Data System (ADS)
Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.
2017-08-01
Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.
Chen, Yushun; Viadero, Roger C; Wei, Xinchao; Fortney, Ronald; Hedrick, Lara B; Welsh, Stuart A; Anderson, James T; Lin, Lian-Shin
2009-01-01
Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
47 CFR 74.788 - Digital construction period.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Digital construction period. 74.788 Section 74... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...
45 CFR 1309.4 - Eligibility-Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...
24 CFR 242.44 - Construction standards.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
7 CFR 3560.71 - Construction financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...
24 CFR 242.44 - Construction standards.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
10 CFR 4.128 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration of buildings...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...
45 CFR 1309.4 - Eligibility-Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
7 CFR 3560.71 - Construction financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...
24 CFR 242.44 - Construction standards.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...
10 CFR 4.128 - New construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration of buildings...
29 CFR 1926.706 - Requirements for masonry construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Requirements for masonry construction. 1926.706 Section..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Concrete and Masonry Construction § 1926.706 Requirements for masonry construction. (a) A limited access zone shall be established...
29 CFR 1926.706 - Requirements for masonry construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Requirements for masonry construction. 1926.706 Section..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Concrete and Masonry Construction § 1926.706 Requirements for masonry construction. (a) A limited access zone shall be established...
29 CFR 1926.706 - Requirements for masonry construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Requirements for masonry construction. 1926.706 Section..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Concrete and Masonry Construction § 1926.706 Requirements for masonry construction. (a) A limited access zone shall be established...
29 CFR 1926.706 - Requirements for masonry construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Requirements for masonry construction. 1926.706 Section..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Concrete and Masonry Construction § 1926.706 Requirements for masonry construction. (a) A limited access zone shall be established...
Constructing Aligned Assessments Using Automated Test Construction
ERIC Educational Resources Information Center
Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui
2013-01-01
We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2013 CFR
2013-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2014 CFR
2014-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2011 CFR
2011-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2012 CFR
2012-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
7 CFR 1924.265 - Eligibility for compensation for construction defects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Eligibility for compensation for construction defects..., DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.265 Eligibility for compensation for construction defects. (a) To be eligible for...
7 CFR 1924.265 - Eligibility for compensation for construction defects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true Eligibility for compensation for construction defects..., DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.265 Eligibility for compensation for construction defects. (a) To be eligible for...
7 CFR 1924.265 - Eligibility for compensation for construction defects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Eligibility for compensation for construction defects..., DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.265 Eligibility for compensation for construction defects. (a) To be eligible for...
7 CFR 1924.265 - Eligibility for compensation for construction defects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Eligibility for compensation for construction defects..., DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.265 Eligibility for compensation for construction defects. (a) To be eligible for...
7 CFR 1924.265 - Eligibility for compensation for construction defects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Eligibility for compensation for construction defects..., DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.265 Eligibility for compensation for construction defects. (a) To be eligible for...
7 CFR 3560.71 - Construction financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...
30 CFR 285.620 - What is a Construction and Operations Plan (COP)?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...
48 CFR 522.804-2 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...
46 CFR 167.20-1 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...
46 CFR 167.20-1 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...
46 CFR 72.20-15 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...
46 CFR 167.20-1 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...
46 CFR 167.20-1 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...
46 CFR 167.20-1 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...
45 CFR 605.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false New construction. 605.23 Section 605.23 Public... Accessibility § 605.23 New construction. (a) Design and construction. Each facility or part of a facility... persons, if the construction was commenced after the effective date of this part. (b) Alteration. Each...
46 CFR 72.20-15 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...
22 CFR 217.23 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
48 CFR 522.804-2 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...
48 CFR 522.804-2 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...
46 CFR 72.20-15 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...
46 CFR 72.20-15 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...
48 CFR 522.804-2 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...
46 CFR 72.20-15 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...
22 CFR 217.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
48 CFR 522.804-2 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Fundamentals of Construction. Instructor Edition. Introduction to Construction Series.
ERIC Educational Resources Information Center
Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.
This instructor's guide contains the materials required to teach a competency-based introductory course in the fundamentals of construction to students who have chosen to explore careers in construction. The following topics are covered in the course's 10 instructional units: industry orientation (exploring the construction industry and starting a…
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
26 CFR 1.460-3 - Long-term construction contracts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction contracts. (a) In general. Section 460 generally requires a taxpayer to determine the income from... not real property. (b) Exempt construction contracts—(1) In general. The general requirement to use...) of this section. (2) Home construction contract—(i) In general. A long-term construction contract is...
36 CFR 223.41 - Payment when purchaser elects government road construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... government road construction. 223.41 Section 223.41 Parks, Forests, and Public Property FOREST SERVICE... Conditions and Provisions § 223.41 Payment when purchaser elects government road construction. Each contract having a provision for construction of specified roads with total estimated construction costs of $50,000...
23 CFR 635.104 - Method of construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... effectiveness is necessary in selecting projects for the design-build delivery method. [56 FR 37004, Aug. 2... 23 Highways 1 2010-04-01 2010-04-01 false Method of construction. 635.104 Section 635.104 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.104 Method of construction. (a) Actual construction work...
Illumina Unamplified Indexed Library Construction: An Automated Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang
Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.
Improvement of the material and transport component of the system of construction waste management
NASA Astrophysics Data System (ADS)
Kostyshak, Mikhail; Lunyakov, Mikhail
2017-10-01
Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.
Space construction system analysis. Part 2: Construction analysis
NASA Technical Reports Server (NTRS)
Roebuck, J. A.; Buck, P. A.; Gimlich, G. W.; Greenberg, H. S.; Hart, R. J.; Indrikis, J.; Lefever, A. E.; Lillenas, A. N.; Mcbaine, C. K.
1980-01-01
The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.
A brief review of the construction aggregates market
Willett, Jason Christopher
2012-01-01
The U.S. Geological Survey defines the construction aggregates industry as those companies that mine and process crushed stone and/or construction sand and gravel. Aggregates have been used from the earliest times of our civilization for a variety of purposes - construction being the major use. As construction aggregates, crushed stone and construction sand and gravel are the basic raw materials used to build the foundation for modern society. The widespread use of construction aggregates is the result of their general availability throughout the country and around the world along with their relatively low cost. Although construction aggregates have a low unit value, their widespread use makes them major contributors to, and indicators of, the economic well-being of the nation.
NASA Astrophysics Data System (ADS)
Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana
2018-03-01
The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.
Studies of the Prefabricated Housing Construction Market in Poland
NASA Astrophysics Data System (ADS)
Radziszewska-Zielina, Elżbieta; Gleń, Monika
2014-11-01
The directions of development of the construction market are not only related to the need to own one's own home but also to increasing functional and economic requirements and conditions of sustainable development. The perception and understanding of prefabrication in housing construction are undoubtedly starting to change. Sustainable construction criteria may constitute a significant turning point and support for the development of new prefabricated housing construction technologies. Entrepreneurs are slowly perceiving an opportunity for the development of prefabrication in the construction market. The implementation and popularisation of ready-made homes will undoubtedly constitute a favourable change in the Polish construction market; however, this will require a modification of habits. This article presents an historical analysis of the development of the prefabricated housing construction market as well as an attempt to answer questions concerning the future of prefabrication in housing construction in Poland based on the conducted studies.
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
The problems and perspectives for the introduction of high-rise construction in Russian cities
NASA Astrophysics Data System (ADS)
Pershina, Anna; Radzhabov, Mehman; Dormidontova, Tatyana
2018-03-01
The propose of academic affairs is discovery the principal areas of concern high-rise construction in Russia. Examples of modern Russian and foreign high-rise construction are considered in the work. The most important problems and their solutions for Russia are identified on their basis. The everyone area of concern is considered separately. Ecology problems and influence of high-rise construction for the healthy and psychological effect of people are considered special. High-rise constructions influence negative and positive for urban environment in Moscow and Samara cities. The experience lack, defects in requirements document, which don't include all high-rise constructions specific, system problem of construction and often non-availability of proper control at the existing requirements document result for complexity of designing, construction and operation. At this moment, high-rise constructions temp is increasing in Moscow. Feasibility of high-rise buildings come up in regions of Russia. The reasons include high material inputs, irregularities of requirements network and utility lines and maintenance problems. The researching follow up of conclusions and recommendations for high-rise constructions development in Russia. The reasons of high-rise buildings are urbanization of people and necessary of concentration labor supply. The important tasks for organization are creating compact urban environment, decrease urban area for development, using an innovative technology for construction and properly maintenance. The balance between the preference of high-rise construction, inputs for construction and influence for ecology are resolve for this task.
Manowong, Ektewan
2012-01-01
Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.
Economic aspects of interlocking hollow brick system designed for industrialized building system
NASA Astrophysics Data System (ADS)
Tahir, Mahmood Md.; Saggaff, Anis; Ngian, Shek Poi; Sulaiman, Arizu
2017-11-01
Construction industry has moved forward into a technology driven where a transition is in progress from conventional method to a more advanced and mechanised system known as the Industrialised Building System (IBS). However, the need to implement the IBS should be well understood by all construction players such as designer, architect, contraction, erectors and construction workers. Therefore, there is a need to educate all these construction players which should be spearheaded by authorities such as Construction Industrial Development Board where enforcement trough building by laws as well as initiative to those that adopt the IBS in their construction. This paper reports on economic aspects of using interlocking hollow brick system in construction as an alternative method offered for Industrialized Building System. The main objective is to address the economic aspects of using interlocking block system in terms of time, costs, and utilization of manpower and to present some of the experimental tests results related to Interlocking Hollow Brick System (IHBS). Example of savings from the use of IHBS is presented in this paper by comparing the construction of two storey terrace house with build-up area of about 200 square meter with conventional construction method of typical reinforced concrete construction (RCC) compared to IHBS. The comparison shows that the implementation of IHBS can reduce construction time, cost, and utilization of man power up to 26.6% compared to the conventional method. Moreover, the construction time using IHBS can also be reduced by up to 50% as compared to the conventional construction.
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
NASA Technical Reports Server (NTRS)
1979-01-01
Construction of large systems in space is a technology requiring the development of construction methods to deploy, assemble, and fabricate the elements comprising such systems. A construction method is comprised of all essential functions and operations and related support equipment necessary to accomplish a specific construction task in a particular way. The data base objective is to provide to the designers of large space systems a compendium of the various space construction methods which could have application to their projects.
Welsh, Stuart A.; Chen, Yushun; Viadero, Stuart C.; Wei, Xinchao; Hedrick, Lara B.; Anderson, James T.; Lin, Lian-Shin
2009-01-01
Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997–2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.
Behavioural manipulation of insect hosts by Baculoviridae as a process of niche construction.
Hamblin, Steven; Tanaka, Mark M
2013-08-16
Niche construction has received increasing attention in recent years as a vital force in evolution and examples of niche construction have been identified in a wide variety of taxa, but viruses are conspicuously absent. In this study we explore how niche construction can lead to viruses engineering their hosts (including behavioural manipulation) with feedback on selective pressures for viral transmission and virulence. To illustrate this concept we focus on Baculoviridae, a family of invertebrate viruses that have evolved to modify the feeding behaviour of their lepidopteran hosts and liquefy their cadavers as part of the course of infection. We present a mathematical model showing how niche construction leads to feedback from the behavioural manipulation to the liquefaction of the host, linking the evolution of both of these traits, and show how this association arises from the action of niche construction. Model results show that niche construction is plausible in this system and delineates the conditions under which niche construction will occur. Niche construction in this system is also shown to be sensitive to parameter values that reflect ecological forces. Our model demonstrates that niche construction can be a potent force in viral evolution and can lead to the acquisition and maintenance of the behavioural manipulation and liquefaction traits in Baculoviridae via the niche constructing effects on the host. These results show the potential for niche construction theory to provide new insights into viral evolution.
Construct Maps as a Foundation for Standard Setting
ERIC Educational Resources Information Center
Wyse, Adam E.
2013-01-01
Construct maps are tools that display how the underlying achievement construct upon which one is trying to set cut-scores is related to other information used in the process of standard setting. This article reviews what construct maps are, uses construct maps to provide a conceptual framework to view commonly used standard-setting procedures (the…
7 CFR 1738.252 - Construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Construction. 1738.252 Section 1738.252 Agriculture... Construction. (a) Construction paid for with broadband loan funds must comply with 7 CFR part 1788, 7 CFR part... agreement with a third-party lender or use its own funds to start construction that is included in the loan...
7 CFR 1738.252 - Construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Construction. 1738.252 Section 1738.252 Agriculture... Construction. (a) Construction paid for with broadband loan funds must comply with 7 CFR part 1788, 7 CFR part... agreement with a third-party lender or use its own funds to start construction that is included in the loan...
7 CFR 15b.19 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 1 2014-01-01 2014-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
28 CFR 42.522 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 42.522 Section 42.522... Section 504 of the Rehabilitation Act of 1973 Accessibility § 42.522 New construction. (a) Design and construction. Each new facility constructed by, on behalf of, or for the use of a recipient shall be designed...
7 CFR 1738.252 - Construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Construction. 1738.252 Section 1738.252 Agriculture... Construction. (a) Construction paid for with broadband loan funds must comply with 7 CFR part 1788, 7 CFR part... agreement with a third-party lender or use its own funds to start construction that is included in the loan...
7 CFR 15b.19 - New construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
Welcome - Construction History Society of America
Construction History Society of America Menu About CHSA Membership Join CHSA Sponsorship Construction History CHSA Biennial Meeting 5th International Congress on Construction History Past Events 2016 Construction History Society of America (CHSA) is dedicated to the study of the history and evolution of all
16th Annual School Construction Report, 2011
ERIC Educational Resources Information Center
Abramson, Paul
2011-01-01
Almost 73 percent of construction in 2009 was of new school buildings. New school buildings accounted for less than 60 percent of construction spending in 2010, suggesting a shift to using less abundant construction dollars to upgrade and add to existing buildings. While overall construction fell more than $1.8 billion in 2010, spending on…
Construction Systems. Curriculum Guide for Technology Education.
ERIC Educational Resources Information Center
Spencer, Albert G.
This curriculum guide for a 1-semester or 1-year course on construction systems is designed to acquaint students with the nature of the construction industry and its technology--tools, materials, and methods of construction--as well as the systems for planning and managing construction projects. The guide contains a course outline, competencies…
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
NASA Technical Reports Server (NTRS)
Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.
1992-01-01
This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.
NASA Astrophysics Data System (ADS)
Klappenecker, Andreas; Rötteler, Martin; Shparlinski, Igor E.; Winterhof, Arne
2005-08-01
We address the problem of constructing positive operator-valued measures (POVMs) in finite dimension n consisting of n2 operators of rank one which have an inner product close to uniform. This is motivated by the related question of constructing symmetric informationally complete POVMs (SIC-POVMs) for which the inner products are perfectly uniform. However, SIC-POVMs are notoriously hard to construct and, despite some success of constructing them numerically, there is no analytic construction known. We present two constructions of approximate versions of SIC-POVMs, where a small deviation from uniformity of the inner products is allowed. The first construction is based on selecting vectors from a maximal collection of mutually unbiased bases and works whenever the dimension of the system is a prime power. The second construction is based on perturbing the matrix elements of a subset of mutually unbiased bases. Moreover, we construct vector systems in Cn which are almost orthogonal and which might turn out to be useful for quantum computation. Our constructions are based on results of analytic number theory.
Human factors simulation in construction management education
NASA Astrophysics Data System (ADS)
Jaeger, M.; Adair, D.
2010-06-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management be taught effectively? Although simulations are applied in construction management education, they have not incorporated human factors sufficiently. The focus on human factors as part of the simulation of construction management situations increases students' learning effectiveness within a cross-cultural teaching setting. This paper shows the development of discrete-event human factors in construction management simulation. A description of the source code is given. Learning effectiveness in a cross-cultural education setting was analysed by evaluating data obtained through student questionnaire surveys. The mean score obtained by the students using the simulator was 32% better than those not exposed to the simulator. The spread of results was noticeably greater for the students not exposed to the simulator. The human factors simulation provides an effective means to teach students the complexities and dynamics of interpersonal relationships in construction management.
Research on carbon emission driving factors of China’s provincial construction industry
NASA Astrophysics Data System (ADS)
Shang, Mei; Dong, Rui; Fu, Yujie; Hao, Wentao
2018-03-01
As a pillar industry of the national economy, the damage to the environment by construction industry can not be ignored. In the context of low carbon development, identifying the main driving factors for the carbon emission of the provincial construction industry are the key for the local government to formulate the development strategy for construction. In the paper, based on the Kaya factor decomposition method, the carbon intensity of the energy structure, energy intensity and the impact of the construction output on the carbon emission of provincial construction industry are studied, and relevant suggestions for low carbon development of provincial construction industry are proposed. The conclusion of this paper provides a theoretical basis for the early realization of low-carbon development in China’s provincial construction industry.
Sun, Edward; Alkalay, Ron; Vader, David; Snyder, Brian D
2009-06-01
An in vitro biomechanical study. Compare the mechanical behavior of 5 different constructs used to terminate dual-rod posterior spinal instrumentation in resisting forward flexion moment. Failure of the distal fixation construct can be a significant problem for patients undergoing surgical treatment for thoracic hyperkyphosis. We hypothesize that augmenting distal pedicle screws with infralaminar hooks or sublaminar cables significantly increases the strength and stiffness of these constructs. Thirty-seven thoracolumbar (T12 to L2) calf spines were implanted with 5 configurations of distal constructs: (1) infralaminar hooks, (2) sublaminar cables, (3) pedicle screws, (4) pedicle screws+infralaminar hooks, and (5) pedicle screws+sublaminar cables. Progressive bending moment was applied to each construct until failure. The mode of failure was noted and the construct's stiffness and failure load determined from the load-displacement curves. Bone density and vertebral dimensions were equivalent among the groups (F=0.1 to 0.9, P>0.05). One-way analysis of covariance (adjusted for differences in density and vertebral dimension) demonstrated that all of the screw-constructs (screw, screw+hook, and screw+cable) exhibited significantly higher stiffness and ultimate failure loads compared with either sublaminar hook or cable alone (P<0.05). The screw+hook constructs (109+/-11 Nm/mm) were significantly stiffer than either screws alone (88+/-17 Nm/mm) or screw+cable (98+/-13 Nm/mm) constructs, P<0.05. Screw+cable construct exhibited significantly higher failure load (1336+/-328 N) compared with screw constructs (1102+/-256 N, P<0.05), whereas not statistically different from the screw+hook construct (1220+/-75 N). The cable and hook constructs failed by laminar fracture, screw construct failed in uniaxial shear (pullout), whereas the screws+(hooks or wires) failed by fracture of caudal vertebral body. Posterior dual rod constructs fixed distally using pedicle screws were stiffer and stronger in resisting forward flexion compared with cables or hooks alone. Augmenting these screws with either infralaminar hooks or sublaminar cables provided additional resistance to failure.
241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.
2013-11-19
This report provides the results of an extent of condition construction history review for the 241-AW tank farm. The construction history of the 241-AW tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AW tank farm, the fourth double-shell tank farm constructed, similar issues as those with tank 241-AY-102 construction occured. The overall extent of similary and affect on 241-AW tank farm integrity is described herein.
241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, Travis J.; Gunter, Jason R.
2013-08-26
This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.
NASA Astrophysics Data System (ADS)
Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy
2018-03-01
This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.
Hedrick, Lara B.; Welsh, S.A.; Anderson, James T.; Lin, L.-S.; Chen, Y.; Wei, X.
2010-01-01
Highway construction in mountainous areas can result in sedimentation of streams, negatively impacting stream habitat, water quality, and biotic communities. We assessed the impacts of construction of a segment of Corridor H, a four-lane highway, in the Lost River watershed, West Virginia, by monitoring benthic macroinvertebrate communities and water quality, before, during, and after highway construction and prior to highway use at upstream and downstream sites from 1997 through 2007. Data analysis of temporal impacts of highway construction followed a Before-After-Control-Impact (BACI) study design. Highway construction impacts included an increase in stream sedimentation during the construction phase. This was indicated by an increase in turbidity and total suspended solids. Benthic macroinvertebrate metrics indicated a community more tolerant during and after construction than in the period before construction. The percent of Chironomidae and the Hilsenhoff Biotic Index (HBI) increased, while percent of Ephemeroptera, Plecoptera, and Trichoptera (EPT) decreased. Our 10-year study addressed short-term impacts of highway construction and found that impacts were relatively minimal. A recovery of the number of EPT taxa collected after construction indicated that the benthic macroinvertebrate community may be recovering from impacts of highway construction. However, this study only addressed a period of 3 years before, 3 years during, and 4 years post construction. Inferences cannot be made concerning the long-term impacts of the highway, highway traffic, runoff, and other factors associated with highway use. Continual monitoring of the watershed is necessary to determine if the highway has a continual impact on stream habitat, water quality, and biotic integrity. ?? 2010 Springer Science+Business Media B.V.
Discussion on mass concrete construction of wind turbine generator foundation
NASA Astrophysics Data System (ADS)
Shang, Liang; Wu, Chaoxiang; Yin, Xiaoyong
2018-04-01
Wind power is one of the main power sources currently. China has rich wind power resources, wind power plants are developed faster and faster. However, China wind power construction started late, which is lack of relevant experience technology. It is easy to produce quality problems. The key to the construction quality of wind power plant is the construction quality of mass concrete construction. Therefore, construction technology and quality control of wind turbine generator foundation mass concrete are discussed and analyzed in the paper.
NASA Technical Reports Server (NTRS)
1991-01-01
The Center for Space Construction at the University of Colorado at Boulder was established in 1988 as a University Space Engineering Research Center. The mission of the Center is to conduct interdisciplinary engineering research which is critical to the construction of future space structures and systems and to educate students who will have the vision and technical skills to successfully lead future space construction activities. The research activities are currently organized around two central projects: Orbital Construction and Lunar Construction. Summaries of the research projects are included.
A study of trade-specific occupational ergonomics considerations in the U.S. construction industry.
Choi, Sang D
2012-01-01
The aim of this survey study was to identify trade-specific ergonomic issues, and discuss practical solutions to reduce work-related musculoskeletal disorders (WMSDs) and injuries in the construction industry. Thirty-two construction firms in the Midwestern United States completed the final survey questionnaire. Twelve different construction skilled trades participated included: general contractor, road, heavy and highway, concrete, electrical, carpentry, landscaping, plumbing, roofing, steel erection, street lighting/traffic signal, and utility construction. Total workforce of the participating companies numbered 11,118 employees. More than 90% of the participants in the survey had a written safety program; however, the majority of the firms did not have a trade-specific ergonomic intervention. The survey revealed that construction constructors perceived safety (worker well-being) as a high priority in their company. This study suggested that construction skilled-trade jobs the construction worker to employ trade-specific hand tools and working body positions that may contribute to different types of WMSD risks, body parts injured, and injury sources. Possible practical construction trade-specific ergonomic solutions might be considered includinge: selection of ergonomic hand tools, reduction of weight of construction materials, and promotion of wellness exercises. This paper may imply that need for more trade-specific ergonomics program elements to help alleviate the work-related musculoskeletal problems in the construction field.
Colangelo, David J; Jones, Bradley L
2005-03-01
Phase I of the Kissimmee River restoration project included backfilling of 12 km of canal and restoring flow through 24 km of continuous river channel. We quantified the effects of construction activities on four water quality parameters (turbidity, total phosphorus flow-weighted concentration, total phosphorus load and dissolved oxygen concentration). Data were collected at stations upstream and downstream of the construction and at four stations within the construction zone to determine if canal backfilling and construction of 2.4 km of new river channel would negatively impact local and downstream water quality. Turbidity levels at the downstream station were elevated for approximately 2 weeks during the one and a half year construction period, but never exceeded the Florida Department of Environmental Protection construction permit criteria. Turbidity levels at stations within the construction zone were high at certain times. Flow-weighted concentration of total phosphorus at the downstream station was slightly higher than the upstream station during construction, but low discharge limited downstream transport of phosphorus. Total phosphorus loads at the upstream and downstream stations were similar and loading to Lake Okeechobee was not significantly affected by construction. Mean water column dissolved oxygen concentrations at all sampling stations were similar during construction.
47 CFR 74.788 - Digital construction period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...
Mental Constructions and Constructions of Web Sites: Learner and Teacher Points of View
ERIC Educational Resources Information Center
Hazzan, Orit
2004-01-01
This research focuses on knowledge and ways in which knowledge may be constructed in the learner's mind. Specifically, it addresses the Web as a cognitive supporter for learning, organising and constructing a new domain of knowledge. In particular, the research analyses student reflection on constructing web sites. The analysis is based on an…
24 CFR 578.47 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true New construction. 578.47 Section 578... construction. (a) Use. Grant funds may be used to: (1) Pay up to 100 percent of the cost of new construction... the floor area by 100 percent or more, and the cost of land associated with that construction, for use...
7. Copy of construction drawing, dated June 10, 1931, Construction ...
7. Copy of construction drawing, dated June 10, 1931, Construction Division, Office of the Construction Quartermaster, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. BOILER HOUSE - BG DETAILS, PLAN NO. 695-300. DRAWING F33A. - Selfridge Field, Building No. 122, North of Wilbur Wright Boulevard between Walnut & Birch Streets, Mount Clemens, Macomb County, MI
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on the various types of construction that may be used, the materials available, and some elementary aspects of the services required…
Detail, juncture bay of 1917 and 1942 construction, showing construction ...
Detail, juncture bay of 1917 and 1942 construction, showing construction bay and typical windows, center of south elevation. - Watertown Arsenal, Building No. 311, Arsenal Street, Watertown, Middlesex County, MA
Construction Manager or General Contractor?
ERIC Educational Resources Information Center
McKinley, John
1991-01-01
Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)
Barriers of lean construction implementation in the Moroccan construction industry
NASA Astrophysics Data System (ADS)
Bajjou, Mohamed Saad; Chafi, Anas
2018-04-01
Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.
Model of investment appraisal of high-rise construction with account of cost of land resources
NASA Astrophysics Data System (ADS)
Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya
2018-03-01
The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.
NASA Astrophysics Data System (ADS)
Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul
2017-08-01
Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.
Community Meeting to Focus on NREL Construction Plans
Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include
Structural Impact of Construction Loads : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
Numerous bridge construction accidents have occurred : because of construction loadings, which are an underemphasized : topic in many specifications and design : manuals. Bridge girders are least stable during the : construction phase, so it is impor...
Construction Management Meets Today's Realities.
ERIC Educational Resources Information Center
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
Recognition method of construction conflict based on driver's eye movement.
Xu, Yi; Li, Shiwu; Gao, Song; Tan, Derong; Guo, Dong; Wang, Yuqiong
2018-04-01
Drivers eye movement data in simulated construction conflicts at different speeds were collected and analyzed to find the relationship between the drivers' eye movement and the construction conflict. On the basis of the relationship between the drivers' eye movement and the construction conflict, the peak point of wavelet processed pupil diameter, the first point on the left side of the peak point and the first blink point after the peak point are selected as key points for locating construction conflict periods. On the basis of the key points and the GSA, a construction conflict recognition method so called the CCFRM is proposed. And the construction conflict recognition speed and location accuracy of the CCFRM are verified. The good performance of the CCFRM verified the feasibility of proposed key points in construction conflict recognition. Copyright © 2018 Elsevier Ltd. All rights reserved.
Content Analysis of the Construction of Self and Others in Women with Bulimia Nervosa
Dada, Gloria; Izu, Sheila; Montebruno, Claudia; Grau, Antoni; Feixas, Guillem
2017-01-01
The purpose of this study was to explore the content of personal constructs in people diagnosed with bulimia nervosa (BN). We expected to find differences in the predominant content of the construct systems between women with and without BN. We analyzed the constructs elicited using the repertory grid technique from 120 women aged between 18 to 45 years, divided into two groups: a clinical group of women diagnosed with bulimia (n = 62) and a control group of university students (n = 58). The constructs were categorized using the Classification System for Personal Constructs (CSPC), composed of six themes which are broken down into 45 categories. For this study, a new area called “Physical” was included, and it consists of three categories. The results indicated that women diagnosed with bulimia used significantly more constructs related to the body, while the control group used more constructs from the personal area. In addition, the congruent constructs from the clinical sample were predominantly moral, or related to values and interests, while discrepant constructs were personal and physical. The findings provide evidence for the clinical use of the CSPC as an instrument for exploring the content of personal meaning systems. Understanding the patient’s personal constructions about herself and others is useful for treatment. Moreover, it is important for clinicians to explore the content of constructs related to symptomatic areas, which could be hindering change, and focus on them to facilitate improvement. PMID:28428765
Technique for Reduction of Environmental Pollution from Construction Wastes
NASA Astrophysics Data System (ADS)
Bakaeva, N. V.; Klimenko, M. Y.
2017-11-01
The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).
NASA Astrophysics Data System (ADS)
Lapidus, Azary; Abramov, Ivan
2018-03-01
Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).
Chen, Y.; Viadero, R.C.; Wei, X.; Fortney, Ronald H.; Hedrick, Lara B.; Welsh, S.A.; Anderson, James T.; Lin, L.-S.
2009-01-01
Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region. Copyright ?? 2009 by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America. All rights reserved.
Behavioural manipulation of insect hosts by Baculoviridae as a process of niche construction
2013-01-01
Background Niche construction has received increasing attention in recent years as a vital force in evolution and examples of niche construction have been identified in a wide variety of taxa, but viruses are conspicuously absent. In this study we explore how niche construction can lead to viruses engineering their hosts (including behavioural manipulation) with feedback on selective pressures for viral transmission and virulence. To illustrate this concept we focus on Baculoviridae, a family of invertebrate viruses that have evolved to modify the feeding behaviour of their lepidopteran hosts and liquefy their cadavers as part of the course of infection. Results We present a mathematical model showing how niche construction leads to feedback from the behavioural manipulation to the liquefaction of the host, linking the evolution of both of these traits, and show how this association arises from the action of niche construction. Model results show that niche construction is plausible in this system and delineates the conditions under which niche construction will occur. Niche construction in this system is also shown to be sensitive to parameter values that reflect ecological forces. Conclusions Our model demonstrates that niche construction can be a potent force in viral evolution and can lead to the acquisition and maintenance of the behavioural manipulation and liquefaction traits in Baculoviridae via the niche constructing effects on the host. These results show the potential for niche construction theory to provide new insights into viral evolution. PMID:23953199
Content Analysis of the Construction of Self and Others in Women with Bulimia Nervosa.
Dada, Gloria; Izu, Sheila; Montebruno, Claudia; Grau, Antoni; Feixas, Guillem
2017-01-01
The purpose of this study was to explore the content of personal constructs in people diagnosed with bulimia nervosa (BN). We expected to find differences in the predominant content of the construct systems between women with and without BN. We analyzed the constructs elicited using the repertory grid technique from 120 women aged between 18 to 45 years, divided into two groups: a clinical group of women diagnosed with bulimia ( n = 62) and a control group of university students ( n = 58). The constructs were categorized using the Classification System for Personal Constructs (CSPC), composed of six themes which are broken down into 45 categories. For this study, a new area called "Physical" was included, and it consists of three categories. The results indicated that women diagnosed with bulimia used significantly more constructs related to the body, while the control group used more constructs from the personal area. In addition, the congruent constructs from the clinical sample were predominantly moral, or related to values and interests, while discrepant constructs were personal and physical. The findings provide evidence for the clinical use of the CSPC as an instrument for exploring the content of personal meaning systems. Understanding the patient's personal constructions about herself and others is useful for treatment. Moreover, it is important for clinicians to explore the content of constructs related to symptomatic areas, which could be hindering change, and focus on them to facilitate improvement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Richardson, Miles; Hunt, Thomas E; Richardson, Cassandra
2014-12-01
This paper presents a methodology to control construction task complexity and examined the relationships between construction performance and spatial and mathematical abilities in children. The study included three groups of children (N = 96); ages 7-8, 10-11, and 13-14 years. Each group constructed seven pre-specified objects. The study replicated and extended previous findings that indicated that the extent of component symmetry and variety, and the number of components for each object and available for selection, significantly predicted construction task difficulty. Results showed that this methodology is a valid and reliable technique for assessing and predicting construction play task difficulty. Furthermore, construction play performance predicted mathematical attainment independently of spatial ability.
Value engineering awareness study for sustainable construction in Malaysia
NASA Astrophysics Data System (ADS)
U, Fathoni; M, Zakaria C.; O, Rohayu C.
2013-06-01
Construction process has often been described as a highly complex process because of the number of disciplines involved during the conceptual, design and construction stage. With the emergence of latest technology and concern for environment, increasing attention in construction industry is given on sustainability. Balance in quality and sustainability has become a major challenge to the construction industry. This paper presents a study that has conducted to determine the acceptance and application of Value Engineering (VE) and Life Cycle Cost Analysis (LCCA) in Malaysia construction industry. A set of questionnaire have distributed to different practitioners in construction industry and the result has reflect the fact that the application of VE and LCCA are still very low.
Reliability of mobile systems in construction
NASA Astrophysics Data System (ADS)
Narezhnaya, Tamara; Prykina, Larisa
2017-10-01
The purpose of the article is to analyze the influence of the mobility of construction production in the article taking into account the properties of reliability and readiness. Basing on the studied systems the effectiveness and efficiency is estimated. The construction system is considered to be the complete organizational structure providing creation or updating of construction facilities. At the same time the production sphere of these systems joins the production on the building site itself, material and technical resources of the construction production and live labour in these spheres within the construction dynamics. The author concludes, that the estimation of the degree of mobility of systems the of construction production makes a great positive effect in the project.
A Human Systems Integration Approach to Energy Efficiency in Ground Transportation
2015-12-01
Granite Construction Organizational Structure .........................................53 Figure 7. A Comparison of USMC Structure to Granite Construction...Caterpillar Corporation and the implementation and use of their telematics systems within a company called Granite Construction. Granite Construction...profit over 250 million dollars annually. In addition, similar to the USMC, Granite Construction handles both large and small scale projects in a
ERIC Educational Resources Information Center
Raykov, Tenko; Marcoulides, George A.; Tong, Bing
2016-01-01
A latent variable modeling procedure is discussed that can be used to test if two or more homogeneous multicomponent instruments with distinct components are measuring the same underlying construct. The method is widely applicable in scale construction and development research and can also be of special interest in construct validation studies.…
25 CFR 1000.249 - What is the Secretary's role in a construction program in an AFA?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false What is the Secretary's role in a construction program in... INDIAN SELF-DETERMINATION AND EDUCATION ACT Construction § 1000.249 What is the Secretary's role in a construction program in an AFA? The Secretary has the following role regarding a construction program contained...
Unit soil loss rate from various construction sites during a storm.
Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung
2009-01-01
The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.
Dental Pulp Stem Cell-Derived, Scaffold-Free Constructs for Bone Regeneration.
Tatsuhiro, Fukushima; Seiko, Tatehara; Yusuke, Takebe; Reiko, Tokuyama-Toda; Kazuhito, Satomura
2018-06-22
In the present study, a scaffold-free tissue construct was developed as an approach for the regeneration of tissue defects, which produced good outcomes. We fabricated a scaffold-free tissue construct from human dental pulp stem cells (hDPSCs construct), and examined the characteristics of the construct. For its fabrication, basal sheets prepared by 4-week hDPSCs culturing were subjected to 1-week three-dimensional culture, with or without osteogenic induction, whereas hDPSC sheets (control) were fabricated by 1-week culturing of basal sheets on monolayer culture. The hDPSC constructs formed a spherical structure and calcified matrix that are absent in the control. The expression levels for bone-related genes in the hDPSC constructs were significantly upregulated compared with those in the control. Moreover, the hDPSC constructs with osteogenic induction had a higher degree of calcified matrix formation, and higher expression levels for bone-related genes, than those for the hDPSC constructs without osteogenic induction. These results suggest that the hDPSC constructs with osteogenic induction are composed of cells and extracellular and calcified matrices, and that they can be a possible scaffold-free material for bone regeneration.
State of offsite construction in India-Drivers and barriers
NASA Astrophysics Data System (ADS)
Arif, M.; Bendi, D.; Sawhney, A.; Iyer, K. C.
2012-05-01
The rapid growth of the construction industry in India has influenced key players in the industry to adopt alternative technologies addressing time, cost and quality. The rising demand in housing, infrastructure and other facilities have further highlighted the need for the construction industry to look at adopting alternate building technologies. Offsite construction has evolved as a panacea to dealing with the under-supply and poor quality in the current age construction industry. Several offsite techniques have been adopted by the construction sector. Although, different forms of offsite techniques have been around for a while but their uptake has been low in the Indian context. This paper presents the perceptions about offsite construction in India and highlights some of the barriers and drivers facing the Indian construction industry. The data was gathered through a survey of 17 high level managers from some of the largest stakeholder organizations of the construction sector in India. The influence of time and cost has been highlighted as a major factor fuelling the adoption of offsite construction. However, the influence of current planning systems and the need for a paradigm shift are some of the prominent barriers towards the adoption of offsite techniques.
Won, Jongsung; Cheng, Jack C P; Lee, Ghang
2016-03-01
Waste generated in construction and demolition processes comprised around 50% of the solid waste in South Korea in 2013. Many cases show that design validation based on building information modeling (BIM) is an effective means to reduce the amount of construction waste since construction waste is mainly generated due to improper design and unexpected changes in the design and construction phases. However, the amount of construction waste that could be avoided by adopting BIM-based design validation has been unknown. This paper aims to estimate the amount of construction waste prevented by a BIM-based design validation process based on the amount of construction waste that might be generated due to design errors. Two project cases in South Korea were studied in this paper, with 381 and 136 design errors detected, respectively during the BIM-based design validation. Each design error was categorized according to its cause and the likelihood of detection before construction. The case studies show that BIM-based design validation could prevent 4.3-15.2% of construction waste that might have been generated without using BIM. Copyright © 2015 Elsevier Ltd. All rights reserved.
Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.
Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V
2017-03-01
Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.
Long, Ashley M; Colón, Melanie R; Bosman, Jessica L; Robinson, Dianne H; Pruett, Hannah L; McFarland, Tiffany M; Mathewson, Heather A; Szewczak, Joseph M; Newnam, J Cal; Morrison, Michael L
2017-01-01
Anthropogenic noise associated with highway construction and operation can have individual- and population-level consequences for wildlife (e.g., reduced densities, decreased reproductive success, behavioral changes). We used a before-after control-impact study design to examine the potential impacts of highway construction and traffic noise on endangered golden-cheeked warblers ( Setophaga chrysoparia ; hereafter warbler) in urban Texas. We mapped and monitored warbler territories before (2009-2011), during (2012-2013), and after (2014) highway construction at three study sites: a treatment site exposed to highway construction and traffic noise, a control site exposed only to traffic noise, and a second control site exposed to neither highway construction or traffic noise. We measured noise levels at varying distances from the highway at sites exposed to construction and traffic noise. We examined how highway construction and traffic noise influenced warbler territory density, territory placement, productivity, and song characteristics. In addition, we conducted a playback experiment within study sites to evaluate acute behavioral responses to highway construction noises. Noise decreased with increasing distance from the highways. However, noise did not differ between the construction and traffic noise sites or across time. Warbler territory density increased over time at all study sites, and we found no differences in warbler territory placement, productivity, behavior, or song characteristics that we can attribute to highway construction or traffic noise. As such, we found no evidence to suggest that highway construction or traffic noise had a negative effect on warblers during our study. Because human population growth will require recurring improvements to transportation infrastructure, understanding wildlife responses to anthropogenic noise associated with the construction and operation of roads is essential for effective management and recovery of prioritized species.
Schmidt, Ulf; Penzkofer, Rainer; Bachmaier, Samuel; Augat, Peter
2013-09-01
Construct stiffness affects healing of bones fixed with locking plates. However, variable construct stiffness reported in the literature may be attributable to differing test configurations and direct comparisons may clarify these differences. We therefore asked whether different distal femur locking plate systems and constructs will lead to different (1) axial and rotational stiffness and (2) fatigue under cyclic loading. We investigated four plate systems for distal femur fixation (AxSOS, LCP, PERI-LOC, POLYAX) of differing designs and materials using bone substitutes in a distal femur fracture model (OTA/AO 33-A3). We created six constructs of each of the four plating systems. Stiffness under static and cyclic loading and fatigue under cyclic loading were measured. Mean construct stiffness under axial loading was highest for AxSOS (100.8 N/mm) followed by PERI-LOC (80.8 N/mm) and LCP (62.6 N/mm). POLYAX construct stiffness testing showed the lowest stiffness (51.7 N/mm) with 50% stiffness of AxSOS construct testing. Mean construct stiffness under torsional loading was similar in the group of AxSOS and PERI-LOC (3.40 Nm/degree versus 3.15 Nm/degree) and in the group of LCP and POLYAX (2.63 Nm/degree versus 2.56 Nm/degree). The fourth load level of > 75,000 cycles was reached by three of six AxSOS, three of six POLYAX, and two of six PERI-LOC constructs. All others including all LCP constructs failed earlier. Implant design and material of new-generation distal femur locking plate systems leads to a wide range of differences in construct stiffness. Assuming construct stiffness affects fracture healing, these data may influence surgical decision-making in choosing an implant system.
Structural Impact of Construction Loads : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
Numerous bridge construction accidents have occurred because of construction loadings, which are an underemphasized topic in many specifications and design manuals. Bridge girders are least stable during the construction phase, so it is important for...
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Design of turbidity controls for Oklahoma highway construction.
DOT National Transportation Integrated Search
2013-03-01
The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...
Financing School Construction: A Primer.
ERIC Educational Resources Information Center
Sendor, Benjamin B.
1985-01-01
Discusses current school construction needs in North Carolina and methods available under state law to finance construction. To put North Carolina law in perspective, the article also discusses school construction finance procedures used throughout the United States. (Author)
30 CFR 75.1708-1 - Surface structures; fireproof construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface structures; fireproof construction. 75... Surface structures; fireproof construction. Structures of fireproof construction is interpreted to mean structures with fireproof exterior surfaces. ...
39. TUNNEL BORE UNDER CONSTRUCTION. VIEW SHOWS LIGHT CONSTRUCTION RAILWAY ...
39. TUNNEL BORE UNDER CONSTRUCTION. VIEW SHOWS LIGHT CONSTRUCTION RAILWAY FOR HAULING MUCK AND SPOIL - Zion-Mount Carmel Highway, Tunnel, Two miles east of Zion Canyon Scenic Drive, Springdale, Washington County, UT
Chou, Chih-Ling; Rivera, Alexander L; Williams, Valencia; Welter, Jean F; Mansour, Joseph M; Drazba, Judith A; Sakai, Takao; Baskaran, Harihara
2017-09-15
Current clinical methods to treat articular cartilage lesions provide temporary relief of the symptoms but fail to permanently restore the damaged tissue. Tissue engineering, using mesenchymal stem cells (MSCs) combined with scaffolds and bioactive factors, is viewed as a promising method for repairing cartilage injuries. However, current tissue engineered constructs display inferior mechanical properties compared to native articular cartilage, which could be attributed to the lack of structural organization of the extracellular matrix (ECM) of these engineered constructs in comparison to the highly oriented structure of articular cartilage ECM. We previously showed that we can guide MSCs undergoing chondrogenesis to align using microscale guidance channels on the surface of a two-dimensional (2-D) collagen scaffold, which resulted in the deposition of aligned ECM within the channels and enhanced mechanical properties of the constructs. In this study, we developed a technique to roll 2-D collagen scaffolds containing MSCs within guidance channels in order to produce a large-scale, three-dimensional (3-D) tissue engineered cartilage constructs with enhanced mechanical properties compared to current constructs. After rolling the MSC-scaffold constructs into a 3-D cylindrical structure, the constructs were cultured for 21days under chondrogenic culture conditions. The microstructure architecture and mechanical properties of the constructs were evaluated using imaging and compressive testing. Histology and immunohistochemistry of the constructs showed extensive glycosaminoglycan (GAG) and collagen type II deposition. Second harmonic generation imaging and Picrosirius red staining indicated alignment of neo-collagen fibers within the guidance channels of the constructs. Mechanical testing indicated that constructs containing the guidance channels displayed enhanced compressive properties compared to control constructs without these channels. In conclusion, using a novel roll-up method, we have developed large scale MSC based tissue-engineered cartilage that shows microscale structural organization and enhanced compressive properties compared to current tissue engineered constructs. Tissue engineered cartilage constructs made with human mesenchymal stem cells (hMSCs), scaffolds and bioactive factors are a promising solution to treat cartilage defects. A major disadvantage of these constructs is their inferior mechanical properties compared to the native tissue, which is likely due to the lack of structural organization of the extracellular matrix of the engineered constructs. In this study, we developed three-dimensional (3-D) cartilage constructs from rectangular scaffold sheets containing hMSCs in micro-guidance channels and characterized their mechanical properties and metabolic requirements. The work led to a novel roll-up method to embed 2-D microscale structures in 3-D constructs. Further, micro-guidance channels incorporated within the 3-D cartilage constructs led to the production of aligned cell-produced matrix and enhanced mechanical function. Copyright © 2017 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.
Study on smart city construction of Jiujiang based on IOT technology
NASA Astrophysics Data System (ADS)
Liu, Zeliang; Wang, Ying; Xu, Qin; Yan, Tao
2017-06-01
At present, with the technology of the Internet of things (IOT), building smart city is forming a powerful wave of city, which promotes economic and social development of city. This paper expounds the connotation of smart city, explores the social and economic significance of the construction of smart city, analyzes the present situation of smart city construction in Jiujiang, studies the basic principles development altar get and key construction projects, and puts forward relevant of Jiujiang smart city construction, and puts forward relevant proposals about smart construction in Jiujiang, Jiangxi.
Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
NASA Astrophysics Data System (ADS)
Zhou, Yong; Huang, You Zhen
2018-06-01
This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.
Shell Structure Water Cellar’s Rapid Construct Technology
NASA Astrophysics Data System (ADS)
Xian Zhuang, Wen; Qing Yin, De; Chen, Shu Fa
2018-05-01
Tradition concrete water cellar’s problems, such as high cost, long construction term, easy to crack, are pointed out. A new construct method, and it’s matching airbag mould, of constructing concrete shell structure water cellars, are introduced. Combine with full-scale verifying cellar’s construct test, full-load water storage test, analyzed the technology in terms of construction term, cost, crack resistance, air bag pressure etc. It is believed that this new technology can successfully solve the problems that tradition technology has, and it will have a good prospect in rainfall resources utilization.
241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R.
2013-07-30
This report provides the results of an extent of condition construction history review for tanks 241-AZ-101 and 241-AZ-102. The construction history of the 241-AZ tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AZ tank farm, the second DST farm constructed, both refractory quality and tank and liner fabrication were improved.
Einstein, Harry; Grimes, Patrick G.
1983-08-23
An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.
Phase and widening construction of steel bridges.
DOT National Transportation Integrated Search
2014-03-01
Phase construction is used to maintain traffic without interruption and generally refers to sequenced construction where a portion of the bridge is under construction while the remainder continues to carry traffic. The method typically results in two...
Code of Federal Regulations, 2014 CFR
2014-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION ...
20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION BRIDGE, GANTRY CRANE AND STRUCTURAL PIERS. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
Guidelines for establishing and maintaining construction quality databases : tech brief.
DOT National Transportation Integrated Search
2006-12-01
Construction quality databases contain a variety of construction-related data that characterize the quality of materials and workmanship. The primary purpose of construction quality databases is to help State highway agencies (SHAs) assess the qualit...
Space Construction System Analysis. Part 2: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
A detailed, end-to-end analysis of the activities, techniques, equipment and Shuttle provisions required to construct a reference project system is described. Included are: platform definition; construction analysis; cost and programmatics; and space construction experiments concepts.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
7 CFR 1753.30 - Closeout procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Construction of Buildings § 1753.30... 257 (Contract to Construct Buildings) and construction or rehabilitation performed by the force...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
What You Should Know about Construction Disputes.
ERIC Educational Resources Information Center
Hohns, H. Murray
1979-01-01
A number of rules that will aid in the decision making of the individual confronted with the need to purchase construction services, administer a construction contract, or be responsible for the performance of those construction services. (Author)
Occupational safety issues in residential construction surveyed in Wisconsin, United States.
Choi, Sang D; Carlson, Kathryn
2014-01-01
Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodruff, Dana L.; Judd, Chaeli; Thom, Ronald M.
2010-01-01
This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, includingmore » harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).« less
Occupational Safety Issues in Residential Construction Surveyed in Wisconsin, United States
CHOI, Sang D.; CARLSON, Kathryn
2014-01-01
Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry. PMID:25016947
Impact of moisture content in AAC on its heat insulation properties
NASA Astrophysics Data System (ADS)
Rubene, S.; Vilnitis, M.
2017-10-01
One of the most popular trends in construction industry is sustainable construction. Therefore, application of construction materials with high insulation characteristics has significantly increased during the past decade. Requirements for application of construction materials with high insulation parameters are required not only by means of energy saving and idea of sustainable construction but also by legislative requirements. Autoclaved aerated concrete (AAC) is a load bearing construction material, which has high heat insulation parameters. However, if the AAC masonry construction has high moisture content the heat insulation properties of the material decrease significantly. This fact lead to the necessity for the on-site control of moisture content in AAC in order to avoid inconsistency between the designed and actual thermal resistivity values of external delimiting constructions. Research of the impact of moisture content in AAC on its heat insulation properties has been presented in this paper.
Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project
NASA Astrophysics Data System (ADS)
Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.
2016-12-01
Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.
Geomagnetism-Aided Indoor Wi-Fi Radio-Map Construction via Smartphone Crowdsourcing.
Li, Wen; Wei, Dongyan; Lai, Qifeng; Li, Xianghong; Yuan, Hong
2018-05-08
Wi-Fi radio-map construction is an important phase in indoor fingerprint localization systems. Traditional methods for Wi-Fi radio-map construction have the problems of being time-consuming and labor-intensive. In this paper, an indoor Wi-Fi radio-map construction method is proposed which utilizes crowdsourcing data contributed by smartphone users. We draw indoor pathway map and construct Wi-Fi radio-map without requiring manual site survey, exact floor layout and extra infrastructure support. The key novelty is that it recognizes road segments from crowdsourcing traces by a cluster based on magnetism sequence similarity and constructs an indoor pathway map with Wi-Fi signal strengths annotated on. Through experiments in real world indoor areas, the method is proved to have good performance on magnetism similarity calculation, road segment clustering and pathway map construction. The Wi-Fi radio maps constructed by crowdsourcing data are validated to provide competitive indoor localization accuracy.
Geomagnetism-Aided Indoor Wi-Fi Radio-Map Construction via Smartphone Crowdsourcing
Li, Wen; Wei, Dongyan; Lai, Qifeng; Li, Xianghong; Yuan, Hong
2018-01-01
Wi-Fi radio-map construction is an important phase in indoor fingerprint localization systems. Traditional methods for Wi-Fi radio-map construction have the problems of being time-consuming and labor-intensive. In this paper, an indoor Wi-Fi radio-map construction method is proposed which utilizes crowdsourcing data contributed by smartphone users. We draw indoor pathway map and construct Wi-Fi radio-map without requiring manual site survey, exact floor layout and extra infrastructure support. The key novelty is that it recognizes road segments from crowdsourcing traces by a cluster based on magnetism sequence similarity and constructs an indoor pathway map with Wi-Fi signal strengths annotated on. Through experiments in real world indoor areas, the method is proved to have good performance on magnetism similarity calculation, road segment clustering and pathway map construction. The Wi-Fi radio maps constructed by crowdsourcing data are validated to provide competitive indoor localization accuracy. PMID:29738454
NASA Astrophysics Data System (ADS)
Widaningsih, L.; Susanti, I.; Chandra, T.
2018-02-01
Construction industry refers to one of the industries dealing with high accident rate. Besides its outdoor workplace involving many workers who usually work manually, the workers’ work culture and less awareness of occupational health and safety (OHS) are attributed to the high accident rate. This study explores some construction workers who are involved in some construction projects in big cities such as Bandung and Jakarta. The questionnaire-given to the construction workers focusing on stone construction, wood construction, and finishing session-reveals that the construction workers knowledge and understanding of nine Occupational Health and Safety (OHS) aspects reach above 50%. However, does not appear to reflect their knowledge and understanding of Occupational Health and Safety (OHS). The results of Focus Group Discussion (FGD) and an in-depth interview show that the fallacious implementation of Occupational Health and Safety (OHS) is attributed to their traditional “work culture”.
ERIC Educational Resources Information Center
Chapman, Robert E.; Rennison, Roderick
The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…
2013-08-01
Sasobit® STA 0+35 cross-section layer thicknesses as constructed............................... 36 Figure 50. Evotherm ™ center-line layer thicknesses...as constructed. ................................................ 37 Figure 51. Evotherm ™ STA 0+15 cross-section layer thicknesses as constructed...37 Figure 52. Evotherm ™ STA 0+25 cross-section layer thicknesses as constructed. .......................... 38 Figure 53
ERIC Educational Resources Information Center
Jackson, Douglas N.
The term "conative" is used to describe constructs that span both motivational and volitional aspects of human behavior, distinguished from constructs that emphasize cognition and affection. Among the conative constructs are achievement strivings, beliefs about self-esteem and self-efficacy, interests and attitudes about learning,…
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false How are these repairs or construction trades persons, home building contractors, or construction companies selected and paid? 256.20 Section 256.20 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HOUSING HOUSING IMPROVEMENT PROGRAM § 256.20 How are these repairs or construction trades persons...
Yoon, Richard S; Dziadosz, Daniel; Porter, David A; Frank, Matthew A; Smith, Wade R; Liporace, Frank A
2014-03-01
Recent advancements in implant technology offer updated options for surgical management that have been rapidly adopted into clinical practice. The objective of this study is to biomechanically test and compare the current fixation options available for surgical fixation of two-part proximal humerus fractures and establish load to failure and stiffness values. Sixteen match-paired (32 total) fresh-frozen, cadaveric specimens were randomized to receive 1 of 4 fixation constructs following creation of an AO/OTA Type 11A3 (two-part) proximal humerus fractures. Fixation constructs tested consisted of 3.5 mm fixed angle plate (3.5-FAP), 4.5 mm fixed angle plate (4.5-FAP), humeral intramedullary nail (IMN), and a humeral intramedullary nail with a fixed angle blade (IMN-FAB). Specimen bone density was measured to ensure no adequate, non-osteoporotic bone. Constructs were tested for stiffness and ultimate load to failure and compared via one-way ANOVA analysis with subsequent post hoc Tukey HSD multiple group comparison statistical analysis. The IMN-FAB construct was significantly stiffer than the 3.5-FAP construct (123.8 vs. 23.9, p<0.0001), the 4.5-FAP construct (123.8 vs. 33.3, p<0.0001) and the IMN construct (123.8 vs. 60.1, p=0.005). The IMN-FAB construct reported a significantly higher load to failure than the 3.5-FAB construct (4667.3 N vs. 1756.9 N, p<0.0001), and the 4.5-FAP construct (4667.3 N vs. 2829.4 N, p=0.019, Table 2). The IMN construct had a significantly higher load to failure than the 3.5-FAP construct (3946.8 vs. 1756.9, p=0.001, Table 2). Biomechanical testing of modern fixation options for two-part proximal humerus fracture exhibited that the stiffest and highest load to failure construct was the IMN-FAB followed by the IMN, 3.5-FAP and then the 4.5-FAP constructs. However, prospective clinical trials with longer-term follow-up are required for definitive assessment of the ideal fixation construct for surgical management of two-part proximal humerus fractures. Copyright © 2013 Elsevier Ltd. All rights reserved.
Ma, Yukun; Gong, Manli; Zhao, Hongtao; Li, Xuyong
2018-02-01
Intense Low-Impact Development (LID) construction in China could lead to increasingly severe stormwater and receiving water pollution due to the lack of appropriate regulation for mitigating pollution from LID construction. Samples of road-deposited sediments (RDS) were collected from 50 study sites at seven LID construction stages and four road hierarchies to analyze the pollution process and determine the size of the region influenced by LID construction. Six heavy metals were analyzed, and the RDS index model was adopted to estimate the potential heavy metal load washed off by stormwater runoff. Analysis of variance revealed that the excavation and gravel filling of rain gardens and excavation of porous pavements were critical LID construction stages that contributed the largest masses of RDS per unit area to road surfaces. Although the concentration of heavy metals at LID construction sites was lower than at sites without LID construction, the load of heavy metals washed off from LID construction was much higher. In addition, the sizes of regions influenced by accumulated RDS from LID construction descended in the following order: arterial road (600-775m)>collector road (150-200m)>access road (100-150m)>laneway (20-30m). According to the characteristics of LID construction at the study sites, the potential total solid loads in stormwater throughout China were estimated to reach 36,694t by 2020 and 146,777t by 2030. According to the results of analysis, several recommendations are provided for designing LID construction regulations to mitigate stormwater pollution. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Ikelle, Luc T.
2006-02-01
We here describe one way of constructing internal multiples from surface seismic data only. The key feature of our construct of internal multiples is the introduction of the concept of virtual seismic events. Virtual events here are events, which are not directly recorded in standard seismic data acquisition, but their existence allows us to construct internal multiples with scattering points at the sea surface; the standard construct of internal multiples does not include any scattering points at the sea surface. The mathematical and computational operations invoked in our construction of virtual events and internal multiples are similar to those encountered in the construction of free-surface multiples based on the Kirchhoff or Born scattering theory. For instance, our construct operates on one temporal frequency at a time, just like free-surface demultiple algorithms; other internal multiple constructs tend to require all frequencies for the computation of an internal multiple at a given frequency. It does not require any knowledge of the subsurface nor an explicit knowledge of specific interfaces that are responsible for the generation of internal multiples in seismic data. However, our construct requires that the data be divided into two, three or four windows to avoid generating primaries. This segmentation of the data also allows us to select a range of periods of internal multiples that one wishes to construct because, in the context of the attenuation of internal multiples, it is important to avoid generating short-period internal multiples that may constructively average to form primaries at the seismic scale.
Research on Swivel Construction Technology of 22,400 Tons in Zoucheng Thirty Meter Bridge
NASA Astrophysics Data System (ADS)
Han, Jun; Benlin, Xiao
2018-05-01
In recent years, with the rapid development of highways and railways in our country, there have been many new bridges that need to cross the existing routes. If the conventional construction methods are used, the existing traffic will be affected and the traffic will be built above the busy traffic lines, so there is a big security risk, the construction methods must be improved and innovated. In this paper, it intends to research and develop some key technologies of swivel construction. According to the construction features to use finite element method of swivel cable-stayed bridge to analyse the cable-stayed bridge . The swivel construction process is carried out to solve the technical problems and difficulties in the construction.
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
Carrillo-Castrillo, Jesús A; Trillo-Cabello, Antonio F; Rubio-Romero, Juan C
2017-06-01
To identify the most frequent causes of accidents in the construction sector in order to help safety practitioners in the task of prioritizing preventive actions depending on the stage of construction. Official accident investigation reports are analysed. A causation pattern is identified with the proportion of causes in each of the different possible groups of causes. Significant associations of the types of causes with accident mechanisms and construction stages have been identified. Significant differences have been found in accident causation depending on the mechanism of the accident and the construction stage ongoing. These results should be used to prioritize preventive actions to combat the most likely causes for each accident mechanism and construction stage.
NASA Astrophysics Data System (ADS)
Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.
2016-08-01
Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
ERIC Educational Resources Information Center
Banke, Ron; Di Gennaro, Guy; Ediger, Rick; Garner, Lanny; Hersom, Steve; Miller, Jack; Nemeth, Ron; Petrucelli, Jim; Sierks, Donna; Smith, Don; Swank, Kevin; West, Kevin
This book establishes guidelines for the construction and maintenance of tracks by providing information for building new tracks or upgrading existing tracks. Subjects covered include running track planning and construction, physical layout, available surfaces, and maintenance. General track requirements and construction specifications are…
Study of Subway Station Design and Construction
DOT National Transportation Integrated Search
1977-03-01
Due to the high cost of urban underground transit construction in recent years, construction practices used in other countries were reviewed to determine if construction methods which are commonly accepted there might be adapted to U.S. practice. Des...
FHWA roadway construction noise model, version 1.0 : user's guide
DOT National Transportation Integrated Search
2006-01-01
The Roadway Construction Noise Model (RCNM) is the Federal Highway Administrations (FHWA) national model for the prediction of construction noise. Due to the fact that construction is often conducted in close proximity to residences and businesses...
48 CFR 11.702 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...
48 CFR 11.702 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...
48 CFR 11.702 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-11
...; Information Collection; Schedules for Construction Contracts AGENCIES: Department of Defense (DOD), General... approved information collection requirement concerning schedules for construction contracts. Public...: Submit comments identified by Information Collection 9000- 0058, Schedules for Construction Contracts by...
48 CFR 11.702 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...
Mapping of information and identification of construction waste at project life cycle
NASA Astrophysics Data System (ADS)
Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia
2018-03-01
The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Method of constructing an improved electrochemical cell
Grimes, Patrick G.; Einstein, Harry
1984-10-09
An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.
7 CFR 1710.120 - Construction standards and contracting.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.120 Construction standards and contracting. Borrowers shall follow all RUS requirements regarding construction work plans, construction standards...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2014 CFR
2014-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2011 CFR
2011-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2013 CFR
2013-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2012 CFR
2012-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
NASA Technical Reports Server (NTRS)
1926-01-01
It has long been thought that metal construction of airplanes would involve an increase in weight as compared with wood construction. Recent experience has shown that such is not the case. This report describes the materials used, treatment of, and characteristics of metal airplane construction.
76 FR 40367 - Federal Acquisition Regulation; Information Collection; Buy American Act-Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
...; Information Collection; Buy American Act--Construction AGENCY: Department of Defense (DOD), General Services... approved information collection requirement concerning the Buy American Act--Construction (Grimberg..., American Act--Construction (Grimberg Decision), by any of the following methods: [[Page 40368
47 CFR 24.103 - Construction requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Construction requirements. 24.103 Section 24... COMMUNICATIONS SERVICES Narrowband PCS § 24.103 Construction requirements. (a) Nationwide narrowband PCS... compliance with the construction requirements set forth in this section, licensees must base their...
47 CFR 24.103 - Construction requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Construction requirements. 24.103 Section 24... COMMUNICATIONS SERVICES Narrowband PCS § 24.103 Construction requirements. (a) Nationwide narrowband PCS... compliance with the construction requirements set forth in this section, licensees must base their...
48 CFR 1522.804-2 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
47 CFR 24.103 - Construction requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Construction requirements. 24.103 Section 24... COMMUNICATIONS SERVICES Narrowband PCS § 24.103 Construction requirements. (a) Nationwide narrowband PCS... compliance with the construction requirements set forth in this section, licensees must base their...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 1522.804-2 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 1522.804-2 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...
48 CFR 1522.804-2 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...
47 CFR 24.103 - Construction requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Construction requirements. 24.103 Section 24... COMMUNICATIONS SERVICES Narrowband PCS § 24.103 Construction requirements. (a) Nationwide narrowband PCS... compliance with the construction requirements set forth in this section, licensees must base their...
48 CFR 1522.804-2 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
76 FR 70807 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... (design and construction). Enplane road structural improvements (design and construction). Landside signage improvements (design and construction). Taxiway B-2 extension and taxiway B-1 rehabilitation (design and construction). Elevator and escalator safety code compliance improvements (design and...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer firms. (a...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
Highway construction related business impacts : phase 3 effort for the town of Dubois.
DOT National Transportation Integrated Search
2008-03-01
Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...
DOT National Transportation Integrated Search
2014-04-01
The first objective of this study was to develop procedures for determining bracing forces during bridge construction. : Numerical finite element models and analysis techniques were developed for evaluating brace forces induced by construction loads ...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
Formation of optimal construction fleet composition
NASA Astrophysics Data System (ADS)
Tuskaeva, Zalina
2017-10-01
Machinery supply and its rational use in construction processes considerably determine the final product of construction organizations. Therefore, the problem of defining the type size composition of the construction fleet as one of the lowest material-intensive productions, is of a particular importance.
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...
ERIC Educational Resources Information Center
Holland, Denise D.; Piper, Randy T.
2016-01-01
The technology integration education model is a 12 construct model that includes 8 primary constructs and 4 moderator constructs. By testing the relationships among two primary constructs (motivation and technological, pedagogical, and content knowledge competencies) and four moderator constructs (goals, feedback, task value, and self-regulation),…
2016-09-01
NSDA Nigerian Steel Development Authority OPC ordinary Portland cement PDF population density factor RCC Reynolds Construction Company RHA rice...construction. Byproducts include blast furnace slag cement and gas. The increased use of steel scrap in production creates less dependence on the raw...The construction resources are gravel, cement , ready-mix concrete, lumber, steel , and brick. In some cases, there are multiple central areas in a
[Talking about the discipline construction and development of burn from five ideas].
Guo, G H
2018-03-20
Discipline construction is an important aspect of hospital modernization management and construction. The level of medical treatment, education, and scientific research could be assured and improved through discipline construction, which could speed up the talent training, promote science and technology innovation, and realize the sustainable development of hospital. At present, most of the hospital management models adopt the two ranks of the hospital and department. The manager of a department must grasp medical treatment, education, scientific research, and discipline construction steadily. The author talks about the discipline construction and development of burn from " five ideas" for the readers.
241-AP Tank Farm Construction Extent of Condition Review for Tank Integrity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.
2014-04-04
This report provides the results of an extent of condition construction history review for the 241-AP tank farm. The construction history of the 241-AP tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AP tank farm, the sixth double-shell tank farm constructed, tank bottom flatness, refractory material quality, post-weld stress relieving, and primary tank bottom weld rejection were improved.
Study on Evaluation Index System of Green mine construction
NASA Astrophysics Data System (ADS)
Li, xin; Yang, JunJie; Yan, Hongcai; Cao, Hongjun
2017-11-01
Green mine is a new and science comprehensive construction mode of mine, which runs the concept of green development through the whole process of mineral resources development and utilization, promotes the transformation and upgrading of mineral enterprises and achieves the healthy and sustainable development of mining industry. This paper is based on “the basic conditions of national green mine”, combined with the current situation of green mine construction, constructing green mine construction evaluation index system which is divided into five areas, including management, comprehensive utilization of mineral resources. technological innovation. ecological environment and cultural construction.
Work-related mild-moderate traumatic brain injury and the construction industry.
Liu, Margaret; Wei, Wenli; Fergenbaum, Jennifer; Comper, Paul; Colantonio, Angela
2011-01-01
Consequences of traumatic brain injury underscore the need to study high-risk groups. Few studies have investigated work-related traumatic brain injuries (WrTBIs) in the construction industry. To examine WrTBIs in Ontario for the construction industry compared to other industries. A retrospective study of individuals who sustained a WrTBI and had a clinical assessment as an outpatient at a hospital-based referral centre. Data were collected for a number of factors including demographic, injury and occupation and were analyzed according to the Person-Environment-Occupation (PEO) model. 435 individuals who sustained a WrTBI. There were 19.1% in the construction industry, 80.9% in other industries. Compared to other industries, individuals in the construction industry were more likely to be male, to not have attained post-secondary education, and experience multiple traumas. WrTBIs in the construction industry were commonly due to elevated work. The construction occupations involved included skilled workers and general labourers, and compared to other industries, WrTBIs occurred most often for those employed for a short duration in the construction industry. Construction industry workers experience serious WrTBIs that are amenable to prevention. Use of the PEO model increased our understanding of WrTBIs in the construction industry.
DALY-Based Health Risk Assessment of Construction Noise in Beijing, China.
Xiao, Jun; Li, Xiaodong; Zhang, Zhihui
2016-10-26
Noise produced by construction activities has become the second most serious acoustic polluting element in China. To provide industry practitioners with a better understanding of the health risks of construction noise and to aid in creating environmentally friendly construction plans during early construction stages, we developed a quantitative model to assess the health impairment risks (HIA) associated with construction noise for individuals living adjacent to construction sites. This model classifies noise-induced health impairments into four categories: cardiovascular disease, cognitive impairment, sleep disturbance, and annoyance, and uses disability-adjusted life years (DALYs) as an indicator of damage. Furthermore, the value of a statistical life (VSL) is used to transform DALYs into a monetary value based on the affected demographic characteristics, thereby offering policy makers a reliable theoretical foundation for establishing reasonable standards to compensate residents suffering from construction noise. A practical earthwork project in Beijing is used as a case study to demonstrate the applicability of the proposed model. The results indicate that construction noise could bring significant health risks to the neighboring resident community, with an estimated 34.51 DALYs of health damage and 20.47 million yuan in social costs. In particular, people aged 45-54 are most vulnerable to construction noise, with the greatest health risks being caused by sleep disturbance.
NASA Astrophysics Data System (ADS)
Wu, Jie; Yan, Quan-sheng; Li, Jian; Hu, Min-yi
2016-04-01
In bridge construction, geometry control is critical to ensure that the final constructed bridge has the consistent shape as design. A common method is by predicting the deflections of the bridge during each construction phase through the associated finite element models. Therefore, the cambers of the bridge during different construction phases can be determined beforehand. These finite element models are mostly based on the design drawings and nominal material properties. However, the accuracy of these bridge models can be large due to significant uncertainties of the actual properties of the materials used in construction. Therefore, the predicted cambers may not be accurate to ensure agreement of bridge geometry with design, especially for long-span bridges. In this paper, an improved geometry control method is described, which incorporates finite element (FE) model updating during the construction process based on measured bridge deflections. A method based on the Kriging model and Latin hypercube sampling is proposed to perform the FE model updating due to its simplicity and efficiency. The proposed method has been applied to a long-span continuous girder concrete bridge during its construction. Results show that the method is effective in reducing construction error and ensuring the accuracy of the geometry of the final constructed bridge.
DALY-Based Health Risk Assessment of Construction Noise in Beijing, China
Xiao, Jun; Li, Xiaodong; Zhang, Zhihui
2016-01-01
Noise produced by construction activities has become the second most serious acoustic polluting element in China. To provide industry practitioners with a better understanding of the health risks of construction noise and to aid in creating environmentally friendly construction plans during early construction stages, we developed a quantitative model to assess the health impairment risks (HIA) associated with construction noise for individuals living adjacent to construction sites. This model classifies noise-induced health impairments into four categories: cardiovascular disease, cognitive impairment, sleep disturbance, and annoyance, and uses disability-adjusted life years (DALYs) as an indicator of damage. Furthermore, the value of a statistical life (VSL) is used to transform DALYs into a monetary value based on the affected demographic characteristics, thereby offering policy makers a reliable theoretical foundation for establishing reasonable standards to compensate residents suffering from construction noise. A practical earthwork project in Beijing is used as a case study to demonstrate the applicability of the proposed model. The results indicate that construction noise could bring significant health risks to the neighboring resident community, with an estimated 34.51 DALYs of health damage and 20.47 million yuan in social costs. In particular, people aged 45–54 are most vulnerable to construction noise, with the greatest health risks being caused by sleep disturbance. PMID:27792207
Ecological and evolutionary consequences of niche construction for its agent.
Kylafis, Grigoris; Loreau, Michel
2008-10-01
Niche construction can generate ecological and evolutionary feedbacks that have been underinvestigated so far. We present an eco-evolutionary model that incorporates the process of niche construction to reveal its effects on the ecology and evolution of the niche-constructing agent. We consider a simple plant-soil nutrient ecosystem in which plants have the ability to increase the input of inorganic nutrient as an example of positive niche construction. On an ecological time scale, the model shows that niche construction allows the persistence of plants under infertile soil conditions that would otherwise lead to their extinction. This expansion of plants' niche, however, requires a high enough rate of niche construction and a high enough initial plant biomass to fuel the positive ecological feedback between plants and their soil environment. On an evolutionary time scale, we consider that the rates of niche construction and nutrient uptake coevolve in plants while a trade-off constrains their values. Different evolutionary outcomes are possible depending on the shape of the trade-off. We show that niche construction results in an evolutionary feedback between plants and their soil environment such that plants partially regulate soil nutrient content. The direct benefit accruing to plants, however, plays a crucial role in the evolutionary advantage of niche construction.
Why developmental niche construction is not selective niche construction: and why it matters.
Stotz, Karola
2017-10-06
In the last decade, niche construction has been heralded as the neglected process in evolution. But niche construction is just one way in which the organism's interaction with and construction of the environment can have potential evolutionary significance. The constructed environment does not just select for , it also produces new variation. Nearly 3 decades ago, and in parallel with Odling-Smee's article 'Niche-constructing phenotypes', West and King introduced the 'ontogenetic niche' to give the phenomena of exo genetic inheritance a formal name. Since then, a range of fields in the life sciences and medicine has amassed evidence that parents influence their offspring by means other than DNA (parental effects), and proposed mechanisms for how heritable variation can be environmentally induced and developmentally regulated. The concept of 'developmental niche construction' (DNC) elucidates how a diverse range of mechanisms contributes to the transgenerational transfer of developmental resources. My most central of claims is that whereas the selective niche of niche construction theory is primarily used to explain the active role of the organism in its selective environment, DNC is meant to indicate the active role of the organism in its developmental environment. The paper highlights the differences between the construction of the selective and the developmental niche, and explores the overall significance of DNC for evolutionary theory.
Shi, Meng; Kretlow, James D.; Spicer, Patrick P.; Tabata, Yasuhiko; Demian, Nagi; Wong, Mark E.; Kasper, F. Kurtis; Mikos, Antonios G.
2011-01-01
An antibiotic-releasing porous polymethylmethacrylate (PMMA) construct was developed to maintain the bony space and prime the wound site in the initial step of a two-stage regenerative medicine approach toward reconstructing significant bony or composite craniofacial tissue defects. Porous polymethylmethacrylate (PMMA) constructs incorporating gelatin microparticles (GMPs) were fabricated by the sequential assembly of GMPs, the antibiotic colistin, and a clinically used bone cement formulation of PMMA powder and methylmethacrylate liquid. PMMA/gelatin/antibiotic constructs with varying gelatin incorporation and drug content were investigated to elucidate the relationship between material composition and construct properties (porosity and drug release kinetics). The porosity of PMMA/gelatin/antibiotic constructs ranged between 7.6±1.8–38.4±1.4% depending on the amount of gelatin incorporated and the drug solution added for gelatin swelling. The constructs released colistin over 10 or 14 days with an average release rate per day above 10 µg/ml. The porosity and in vitro colistin release kinetics of PMMA/gelatin/antibiotic constructs were tuned by varying the material composition and fabrication parameters. This study demonstrates the potential of gelatin-incorporating PMMA constructs as a functional space maintainer for both promoting tissue healing/coverage and addressing local infections, enabling better long-term success of the definitive regenerated tissue construct. PMID:21295086
Efficient dynamic graph construction for inductive semi-supervised learning.
Dornaika, F; Dahbi, R; Bosaghzadeh, A; Ruichek, Y
2017-10-01
Most of graph construction techniques assume a transductive setting in which the whole data collection is available at construction time. Addressing graph construction for inductive setting, in which data are coming sequentially, has received much less attention. For inductive settings, constructing the graph from scratch can be very time consuming. This paper introduces a generic framework that is able to make any graph construction method incremental. This framework yields an efficient and dynamic graph construction method that adds new samples (labeled or unlabeled) to a previously constructed graph. As a case study, we use the recently proposed Two Phase Weighted Regularized Least Square (TPWRLS) graph construction method. The paper has two main contributions. First, we use the TPWRLS coding scheme to represent new sample(s) with respect to an existing database. The representative coefficients are then used to update the graph affinity matrix. The proposed method not only appends the new samples to the graph but also updates the whole graph structure by discovering which nodes are affected by the introduction of new samples and by updating their edge weights. The second contribution of the article is the application of the proposed framework to the problem of graph-based label propagation using multiple observations for vision-based recognition tasks. Experiments on several image databases show that, without any significant loss in the accuracy of the final classification, the proposed dynamic graph construction is more efficient than the batch graph construction. Copyright © 2017 Elsevier Ltd. All rights reserved.
Prospective safety performance evaluation on construction sites.
Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong
2015-05-01
This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.
36 CFR 212.4 - Construction and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Construction and maintenance... TRAVEL MANAGEMENT Administration of the Forest Transportation System § 212.4 Construction and maintenance. (a) Construction and maintenance work on forest transportation facilities with appropriated funds...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...] Lower Colorado River Authority Transmission Services Corporation; Construction, Operation, Maintenance... activities associated with LCRA TSC's construction, maintenance, operation, and repair of four Competitive..., substation upgrades, and access roads) required to be constructed by the Public Utility Commission of Texas...
Environment, Health, and Safety - Construction Subcontractors Documents |
NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment , Health, and Safety - Construction Subcontractors Documents The purpose of this page is to ensure NREL Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
46 CFR 160.042-3 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...
46 CFR 161.012-7 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...
48 CFR 46.312 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...
46 CFR 160.042-3 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...
48 CFR 422.804-2 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...
48 CFR 46.312 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...
47 CFR 101.1325 - Construction requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...
23 CFR 650.209 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...
46 CFR 160.047-4 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 160.047-4 Section 160.047-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and Child § 160.047-4 Construction. (a) General. This specification covers buoyant vests which...
48 CFR 546.312 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...
23 CFR 650.209 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...
46 CFR 160.047-4 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 160.047-4 Section 160.047-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and Child § 160.047-4 Construction. (a) General. This specification covers buoyant vests which...
46 CFR 161.012-7 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...
47 CFR 101.1325 - Construction requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...
23 CFR 650.209 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...
49 CFR 195.266 - Construction records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Construction records. 195.266 Section 195.266 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.266 Construction records. A complete record that shows the following must be...
49 CFR 193.2303 - Construction acceptance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY...: FEDERAL SAFETY STANDARDS Construction § 193.2303 Construction acceptance. No person may place in service...
47 CFR 22.1035 - Construction period.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...
46 CFR 160.176-9 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...
46 CFR 160.002-4 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...
46 CFR 160.002-4 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...
46 CFR 160.042-3 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...
46 CFR 161.012-7 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...
48 CFR 546.312 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...
48 CFR 422.804-2 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...
46 CFR 160.002-4 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...
47 CFR 22.1035 - Construction period.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...
47 CFR 22.1035 - Construction period.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...
49 CFR 195.266 - Construction records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Construction records. 195.266 Section 195.266 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.266 Construction records. A complete record that shows the following must be...
46 CFR 161.012-7 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
48 CFR 46.312 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...
46 CFR 160.176-9 - Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...
47 CFR 22.1035 - Construction period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...
46 CFR 160.002-4 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...
48 CFR 422.804-2 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...
49 CFR 193.2303 - Construction acceptance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY...: FEDERAL SAFETY STANDARDS Construction § 193.2303 Construction acceptance. No person may place in service...
46 CFR 160.176-9 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...
23 CFR 650.209 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...
48 CFR 546.312 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...
48 CFR 422.804-2 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...
46 CFR 160.042-3 - Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...
46 CFR 160.176-9 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...
48 CFR 46.312 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...
48 CFR 422.804-2 - Construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...
48 CFR 546.312 - Construction contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...
23 CFR 650.209 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...
47 CFR 22.1035 - Construction period.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization... changes to the features of the geologic repository and the procedures authorized. The restrictions that... setting as well as measures related to the design and construction of the geologic repository operations...
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents construction comparative data from the 27th Annual Official Education Construction Report on education construction spending for 2000. Data tables show where the construction is happening by region, projected spending areas through 2003, new school and retrofitting costs, and the types of retrofits being performed. (GR)
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As required by FAR...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, a trained and qualified servicing housing office representative or building inspector will review the construction to ensure that it meets applicable minimum construction standards and building codes...
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, a trained and qualified servicing housing office representative or building inspector will review the construction to ensure that it meets applicable minimum construction standards and building codes...
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, a trained and qualified servicing housing office representative or building inspector will review the construction to ensure that it meets applicable minimum construction standards and building codes...
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, a trained and qualified servicing housing office representative or building inspector will review the construction to ensure that it meets applicable minimum construction standards and building codes...
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, a trained and qualified servicing housing office representative or building inspector will review the construction to ensure that it meets applicable minimum construction standards and building codes...
DOT National Transportation Integrated Search
2013-12-01
The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...
23 CFR 633.209 - Notices to prospective Federal-aid construction contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Development System and Appalachian local access roads construction contracts. ... 23 Highways 1 2010-04-01 2010-04-01 false Notices to prospective Federal-aid construction...) § 633.209 Notices to prospective Federal-aid construction contractors. The State highway department...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
NASA Astrophysics Data System (ADS)
Orlov, Alexandr K.
2017-10-01
The article deals with the application of sustainable construction concept within implementation of megaprojects of tourist clusters development using energy saving technologies. The concept of sustainable construction includes the elements of green construction, energy management as well as aspects of the economic efficiency of construction projects implementation. The methodical approach to the implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction is proved. The conceptual approach to the evaluation of the ecological, social and economic components of the integral indicator of the effectiveness of the megaproject for the development of the tourist cluster is provided. The algorithm for estimation of the efficiency of innovative solutions in green construction is considered.
NASA Astrophysics Data System (ADS)
Fedorov, Maksim; Matys, Elena; Kopytova, Anna
2018-03-01
Outlined the main trends in the development of the construction sector in the Russian Federation at the present stage of its development are identified problems and shortcomings of current investment in the construction industry. It is proved that to consider the investment and construction process should be in terms of the strategic and tactical aspects. It was established that, on the basis of the spirit and the participants of investment and construction process, the strategic aspect it should be focused primarily on the formation of financial resources (through various mechanisms) and to attract investors. A tactical aspect of the investment and construction process is focused on the choice of organizational form of the project and the rational use of resources generated by the investment in construction.
Hierarchical Control and Trajectory Planning
NASA Technical Reports Server (NTRS)
Martin, Clyde F.; Horn, P. W.
1994-01-01
Most of the time on this project was spent on the trajectory planning problem. The construction is equivalent to the classical spline construction in the case that the system matrix is nilpotent. If the dimension of the system is n then the spline of degree 2n-1 is constructed. This gives a new approach to the construction of splines that is more efficient than the usual construction and at the same time allows the construction of a much larger class of splines. All known classes of splines are reconstructed using the approach of linear control theory. As a numerical analysis tool control theory gives a very good tool for constructing splines. However, for the purposes of trajectory planning it is quite another story. Enclosed in this document are four reports done under this grant.
Impact of ICT on Performance of Construction Companies in Slovakia
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
Information and communication technologies became a part of management tools in modern companies. Construction industry and its participants deal with a serious requirement for processing the huge amount of information on construction projects including design, construction, time and cost parameters, economic efficiency and sustainability. To fulfil this requirement, companies have to use appropriate ICT tools. Aim of the paper is to examine the impact of ICT exploitation on performance of construction companies. The impact of BIM tools, ERP systems and controlling system on cost and profit indicators will be measured on the sample of 85 companies from construction industry in Slovakia. Enterprise size, enterprise ownership and role in construction process will be set as independent variables for statistical analyse. The results will be considered for different groups of companies.
The Impact of Airport Performance towards Construction and Infrastructure Expansion in Indonesia
NASA Astrophysics Data System (ADS)
Laksono, T. D.; Kurniasih, N.; Hasyim, C.; Setiawan, M. I.; Ahmar, A. S.
2018-01-01
Development that is generated from airport areas includes construction and infrastructure development. This research reviews about how the implementation of material management in certain construction project and the relationship between development especially construction and infrastructure development with Airport Performance. The method that is used in this research is mixed method. The population in this research is 297 airports that are existed in Indonesia. From those 297 airports then it is chosen airports that have the most completed data about construction project and it is obtained 148 airports. Based on the coefficient correlation (R) test it is known that construction and infrastructure development has relatively strong relation with airport performance variable, but there are still other factors that influence construction and infrastructure development become bigger effect.