Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Space construction system analysis. Part 2: Cost and programmatics
NASA Technical Reports Server (NTRS)
Vonflue, F. W.; Cooper, W.
1980-01-01
Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation
Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869
Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.
Oil and gas pipeline construction cost analysis and developing regression models for cost estimation
NASA Astrophysics Data System (ADS)
Thaduri, Ravi Kiran
In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.
NASA Technical Reports Server (NTRS)
1977-01-01
Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO₂ emissions of input materials for each structural frame type. In addition, the CO₂ emissions cost was measured using the trading price of CO₂ emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO₂ emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO₂ emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future.
Space Construction System Analysis. Part 2: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
A detailed, end-to-end analysis of the activities, techniques, equipment and Shuttle provisions required to construct a reference project system is described. Included are: platform definition; construction analysis; cost and programmatics; and space construction experiments concepts.
DOT National Transportation Integrated Search
2003-04-01
The Louisiana Department of Transportation and Development (LADOTD) is interested in applying the Federal Highway Administration=s (FHWA) life cycle cost analysis procedures and model to large roadway construction, maintenance, and rehabilitation pro...
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO2 emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO2 emissions of input materials for each structural frame type. In addition, the CO2 emissions cost was measured using the trading price of CO2 emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO2 emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO2 emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future. PMID:24227998
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2012-03-02
challenging ship redesign as well as a new power and cooling architecture coupled with the challenges to construct such a dense ship, will make...costs. Our prior work has shown that construction of lead ships is challenging , the risk of cost growth is high, and having sufficient construction...not include a thorough trade-off analysis that would compare the relative costs and benefits of different solutions under consideration or provide
Lift-Shape Construction, An EFL Project Report.
ERIC Educational Resources Information Center
Evans, Ben H.
Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…
Gachango, F G; Pedersen, S M; Kjaergaard, C
2015-12-01
Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
1994-06-07
023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to
NASA Astrophysics Data System (ADS)
Yamasaki, Hayata; Soeda, Akihito; Murao, Mio
2017-09-01
We introduce and analyze graph-associated entanglement cost, a generalization of the entanglement cost of quantum states to multipartite settings. We identify a necessary and sufficient condition for any multipartite entangled state to be constructible when quantum communication between the multiple parties is restricted to a quantum network represented by a tree. The condition for exact state construction is expressed in terms of the Schmidt ranks of the state defined with respect to edges of the tree. We also study approximate state construction and provide a second-order asymptotic analysis.
An economic analysis of alternative paving materials
NASA Astrophysics Data System (ADS)
Mustain, J. L.
1982-12-01
The purpose of this paper is to present a means for economic analysis of alternative equivalent pavement designs, considering such factors as initial construction cost, annual maintenance cost, salvage value and the various intangibles which occur during the analysis period. Having established a means of economic comparison, it is then the intent of this paper to show that Portland Cement Concrete has been and is a viable pavement alternative and ought to receive due consideration in the military construction program.
Life Cycle Cost Analysis of Portland Cement Concrete Pavements
DOT National Transportation Integrated Search
1999-09-01
This report describes the development of a new life cycle cost analysis methodology for Portland cement concrete pavements - one that considers all aspects of pavement design, construction, maintenance, and user impacts throughout the analysis period...
Corps of Engineers’ Acquisition of Fish Hatchery Proves Costly.
1981-09-18
location, size, esti- mated cost, design , and construction timetables for facilities needed to meet the steelhead production requirements. To limit...hatchery "* * * is not recognized to be one of the more efficient and productive facilities in Idaho due to obvious con- straints in design , construction...agency’s decision to supply the product or service it- self because it would cost less must be supported by a comparativ , cost analysis. According to Corps
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
Workers' compensation costs among construction workers: a robust regression analysis.
Friedman, Lee S; Forst, Linda S
2009-11-01
Workers' compensation data are an important source for evaluating costs associated with construction injuries. We describe the characteristics of injured construction workers filing claims in Illinois between 2000 and 2005 and the factors associated with compensation costs using a robust regression model. In the final multivariable model, the cumulative percent temporary and permanent disability-measures of severity of injury-explained 38.7% of the variance of cost. Attorney costs explained only 0.3% of the variance of the dependent variable. The model used in this study clearly indicated that percent disability was the most important determinant of cost, although the method and uniformity of percent impairment allocation could be better elucidated. There is a need to integrate analytical methods that are suitable for skewed data when analyzing claim costs.
Safety cost management in construction companies: A proposal classification.
López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C
2016-06-16
Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.
40 CFR 60.1115 - What is a siting analysis?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... § 60.1115 What is a siting analysis? The siting analysis addresses how your municipal waste combustion... environmental and social costs resulting from its location and construction. The analysis must also consider...
BMP COST ANALYSIS FOR SOURCE WATER PROTECTION
Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...
1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.
1981-02-02
7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of
Construction of VLCC marine oil storage cost index system
NASA Astrophysics Data System (ADS)
Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen
2018-04-01
VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.
Cost viability of 3D printed house in UK
NASA Astrophysics Data System (ADS)
Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.
2018-03-01
UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
BMP COST ANALYSIS FOR SOURCE WATER PROTECTION
Cost equations are developed to estimate capital and operations and maintenance (O&M) for commonly used best management practices (BMPS). Total BMP volume and/or surface area is used to predict these costs. ENR construction cost index was used to adjust cost data to December 2000...
Comprehensive risk analysis for structure type selection.
DOT National Transportation Integrated Search
2010-04-01
Optimization of bridge selection and design traditionally has been sought in terms of the finished structure. This study presents a : more comprehensive risk-based analysis that includes user costs and accidents during the construction phase. Costs f...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2013 CFR
2013-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2011 CFR
2011-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2012 CFR
2012-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2014 CFR
2014-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...
Code of Federal Regulations, 2011 CFR
2011-10-01
... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...
Code of Federal Regulations, 2010 CFR
2010-10-01
... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
Cost Analysis of Leed Certified United States Navy Buildings
2011-08-03
be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding
Trends in highway construction costs in Louisiana.
DOT National Transportation Integrated Search
1999-09-01
The objective of this research was to identify and quantify the factors that influence the price of highway construction in Louisiana. The method of investigation involved a literature review and an analysis of construction price records in Louisiana...
1988-12-01
COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type
NASA Astrophysics Data System (ADS)
Juszczyk, Michał; Leśniak, Agnieszka; Zima, Krzysztof
2013-06-01
Conceptual cost estimation is important for construction projects. Either underestimation or overestimation of building raising cost may lead to failure of a project. In the paper authors present application of a multicriteria comparative analysis (MCA) in order to select factors influencing residential building raising cost. The aim of the analysis is to indicate key factors useful in conceptual cost estimation in the early design stage. Key factors are being investigated on basis of the elementary information about the function, form and structure of the building, and primary assumptions of technological and organizational solutions applied in construction process. The mentioned factors are considered as variables of the model which aim is to make possible conceptual cost estimation fast and with satisfying accuracy. The whole analysis included three steps: preliminary research, choice of a set of potential variables and reduction of this set to select the final set of variables. Multicriteria comparative analysis is applied in problem solution. Performed analysis allowed to select group of factors, defined well enough at the conceptual stage of the design process, to be used as a describing variables of the model.
An analysis of short haul airline operating costs
NASA Technical Reports Server (NTRS)
Kanafani, A.; Taghavi, S.
1975-01-01
The demand and supply characteristics of short haul air transportation systems are investigated in terms of airline operating costs. Direct, indirect, and ground handling costs are included. Supply models of short haul air transportation systems are constructed.
NASA Astrophysics Data System (ADS)
Rui, Zhenhua
This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average overrun rates for compressor station material, labor, miscellaneous, land, and total costs are 3%, 60%, 2%, -14%, and 11%, respectively, and cost overruns for cost components are influenced by location and year of completion to different degrees. Monte Carlo models are developed and simulated to evaluate the feasibility of an Alaska in-state gas pipeline by assigning triangular distribution of the values of economic parameters. Simulated results show that the construction of an Alaska in-state natural gas pipeline is feasible at three scenarios: 500 million cubic feet per day (mmcfd), 750 mmcfd, and 1000 mmcfd.
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
The cost of construction delays and traffic control for life-cycle cost analysis of pavements
DOT National Transportation Integrated Search
2002-03-01
The objective of this report is to provide the Kentucky Transportation Cabinet a reliable approach to quantifying/calculating "Road User Cost"--often referred to as total user delay costs. To meet this objective, this report is divided into three mai...
Sorock, G S; Ranney, T A; Lehto, M R
1996-01-01
Motor vehicle travel through roadway construction workzones has been shown to increase the risk of a crash. The number of workzones has increased due to recent congressional funding in 1991 for expanded roadway maintenance and repair. In this paper, we describe the characteristics and costs of motor vehicle crashes in roadway construction workzones. As opposed to using standard accident codes to identify accident types, automobile insurance claims files from 1990-93 were searched to identify records with the keyword "construction" in the accident narrative field. A total of 3,686 claims were used for the analysis of crashes. Keywords from the accident narrative field were used to identify five pre-crash vehicle activities and five crash types. We evaluated misclassification error by reading 560 randomly selected claims and found it to be only 5%. For each of four years, 1990-93, there was a total of 648,996,977 and 1,065 crashes, respectively. There was a 70% increase in the crash rate per 10,000 personal insured vehicles from 1990-93 (2.1-3.6). Most crashes (26%) involved a stopped or slowing vehicle in the workzone. The most common crash (31%) was a rear-end collision. The most costly pre-crash activity was a major judgment error on the part of a driver (n = 120, median cost = $2,628). An overturned vehicle was the most costly crash type (n = 16, median cost = $4,745). In summary, keyword text analysis of accident narrative data used in this study demonstrated its utility and potential for enhancing injury epidemiology. The results suggest interventions are needed to respond to growing traffic hazards in construction workzones.
NASA Astrophysics Data System (ADS)
Tarmizi, H. B.; Daulay, M.; Muda, I.
2017-03-01
This study aims to test the aggregation of the economic growth of North Sumatra and the influence of the Tax on Acquisition of Land and Building to the Construction Cost Index in North Sumatra. This type of research is explanatory survey with quantitative methods. The population and the sample district in North Sumatra with the observation time series and cross sectional. The analysis tool used is multiple regression. The results showed that there was economic growth aggregation of North Sumatra and the influence of the Tax on Acquisition of Land and Building affect the Construction Cost Index.
Early Design Choices: Capture, Model, Integrate, Analyze, Simulate
NASA Technical Reports Server (NTRS)
Malin, Jane T.
2004-01-01
I. Designs are constructed incrementally to meet requirements and solve problems: a) Requirements types: objectives, scenarios, constraints, ilities. etc. b) Problem/issue types: risk/safety, cost/difficulty, interaction, conflict, etc. II. Capture requirements, problems and solutions: a) Collect design and analysis products and make them accessible for integration and analysis; b) Link changes in design requirements, problems and solutions; and c) Harvest design data for design models and choice structures. III. System designs are constructed by multiple groups designing interacting subsystems a) Diverse problems, choice criteria, analysis methods and point solutions. IV. Support integration and global analysis of repercussions: a) System implications of point solutions; b) Broad analysis of interactions beyond totals of mass, cost, etc.
Fitting of full Cobb-Douglas and full VRTS cost frontiers by solving goal programming problem
NASA Astrophysics Data System (ADS)
Venkateswarlu, B.; Mahaboob, B.; Subbarami Reddy, C.; Madhusudhana Rao, B.
2017-11-01
The present research article first defines two popular production functions viz, Cobb-Douglas and VRTS production frontiers and their dual cost functions and then derives their cost limited maximal outputs. This paper tells us that the cost limited maximal output is cost efficient. Here the one side goal programming problem is proposed by which the full Cobb-Douglas cost frontier, full VRTS frontier can be fitted. This paper includes the framing of goal programming by which stochastic cost frontier and stochastic VRTS frontiers are fitted. Hasan et al. [1] used a parameter approach Stochastic Frontier Approach (SFA) to examine the technical efficiency of the Malaysian domestic banks listed in the Kuala Lumpur stock Exchange (KLSE) market over the period 2005-2010. AshkanHassani [2] exposed Cobb-Douglas Production Functions application in construction schedule crashing and project risk analysis related to the duration of construction projects. Nan Jiang [3] applied Stochastic Frontier analysis to a panel of New Zealand dairy forms in 1998/99-2006/2007.
DOT National Transportation Integrated Search
1994-05-01
This report documents an analysis performed in support of the United States Coast Guard in managing its fleet of construction tenders (WLICs). The project was sponsored by the Coast Guard's Office of Navigation Safety and Waterway Services, Short Ran...
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. This research project addressed the following questions: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences?more » 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost?« less
A simulation model of hospital management based on cost accounting analysis according to disease.
Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki
2004-12-01
Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.
Simulation of tunneling construction methods of the Cisumdawu toll road
NASA Astrophysics Data System (ADS)
Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.
2017-11-01
Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.
Life Cycle Cost Analysis Handbook. First Edition.
ERIC Educational Resources Information Center
Alaska State Dept. of Education and Early Development, Juneau.
This handbook presents guidelines on the Life Cycle Cost Analysis (LCCA) of building operations over the life of a building to assist school districts and consultants with evaluating proposed educational facility construction projects. It defines the terminology found in an LCCA, such as initial and future expenses, residual value, real discount…
Cost Accounting: Problems and Research Related to Cost Definitions and Collection of Data
ERIC Educational Resources Information Center
Lyons, John M.
1978-01-01
Recent evidence suggests that traditional cost analysis may not be the most appropriate way to justify educational budgets. This article suggests that using constructed cost models to develop operating budget requests can help ensure that the distinction between legitimate information needs and managerial autonomy is maintained. (LBH)
ERIC Educational Resources Information Center
Bowen, Brian
1974-01-01
The third installment of a Building Cost File points out the necessity of providing a framework for overall cost control during design. A cost analysis (see EA 504 571) illustrates how the use of construction elements or subsystems provide a suitable means. Other related articles are EA 503 949, 950, 951, and EA 504 578-579. (MF)
Designing for psychological change: individuals' reward and cost valuations in weight management.
Hsu, Anne; Blandford, Ann
2014-06-26
Knowledge of the psychological constructs that underlie behavior offers valuable design opportunities for persuasive systems. We use the decision theory, which describes how behavior is underpinned by reward-cost valuations, as a framework for investigating such psychological constructs to deliver design objectives for weight management technologies. We applied a decision theory-based analysis in the domain of weight management to understand the rewards and costs that surround individuals' weight management behaviors, with the aim of uncovering design opportunities for weight management technologies. We conducted qualitative interviews with 15 participants who were or had been trying to lose weight. Thematic analysis was used to extract themes that covered the rewards and costs surrounding weight management behaviors. We supplemented our qualitative study with a quantitative survey of 100 respondents investigating the extent to which they agreed with statements reflecting themes from the qualitative study. The primary obstacles to weight management were the rewards associated with unhealthy choices, such as the pleasures of unhealthy foods and unrestricted consumption in social situations, and the significant efforts required to change habits, plan, and exercise. Psychological constructs that supported positive weight management included feeling good after making healthy choices, being good to oneself, experiencing healthy yet still delicious foods, and receiving social support and encouraging messages (although opinions about encouraging messages was mixed). A rewards-costs driven enquiry revealed a wide range of psychological constructs that contribute to discouraging and supporting weight management. The constructs extracted from our qualitative study were verified by our quantitative survey, in which the majority of respondents also reported similar thoughts and feelings. This understanding of the rewards and costs surrounding weight management offers a range of new opportunities for the design of weight management technologies that enhance the encouraging factors and alleviate the discouraging ones.
Cost analysis of the built environment: the case of bike and pedestrian trials in Lincoln, Neb.
Wang, Guijing; Macera, Caroline A; Scudder-Soucie, Barbara; Schmid, Tom; Pratt, Michael; Buchner, David; Heath, Gregory
2004-04-01
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calculated. Trail length averaged 3.6 miles (range = 1.6-4.6 miles). Annual cost in 2002 dollars ranged from 25,762 to 248,479 (mean = 124,927; median = 171,064). The cost per mile ranged from 5735 to 54,017 (mean = 35,355; median = 37,994). The annual cost per user was 235 (range = 83-592), whereas per capita annual medical cost of inactivity was 622. Construction of trails fits a wide range of budgets and may be a viable health amenity for most communities. To increase trail cost-effectiveness, efforts to decrease cost and increase the number of users should be considered.
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
Fu, Fang; Zhang, Tao
2016-01-01
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939
Economic analysis of transmission line engineering based on industrial engineering
NASA Astrophysics Data System (ADS)
Li, Yixuan
2017-05-01
The modern industrial engineering is applied to the technical analysis and cost analysis of power transmission and transformation engineering. It can effectively reduce the cost of investment. First, the power transmission project is economically analyzed. Based on the feasibility study of power transmission and transformation project investment, the proposal on the company system cost management is put forward through the economic analysis of the effect of the system. The cost management system is optimized. Then, through the cost analysis of power transmission and transformation project, the new situation caused by the cost of construction is found. It is of guiding significance to further improve the cost management of power transmission and transformation project. Finally, according to the present situation of current power transmission project cost management, concrete measures to reduce the cost of power transmission project are given from the two aspects of system optimization and technology optimization.
NASA Astrophysics Data System (ADS)
Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad
2017-11-01
Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.
Global cost analysis on adaptation to sea level rise based on RCP/SSP scenarios
NASA Astrophysics Data System (ADS)
Kumano, N.; Tamura, M.; Yotsukuri, M.; Kuwahara, Y.; Yokoki, H.
2017-12-01
Low-lying areas are the most vulnerable to sea level rise (SLR) due to climate change in the future. In order to adapt to SLR, it is necessary to decide whether to retreat from vulnerable areas or to install dykes to protect them from inundation. Therefore, cost- analysis of adaptation using coastal dykes is one of the most essential issues in the context of climate change and its countermeasures. However, few studies have globally evaluated the future costs of adaptation in coastal areas. This study tries to globally analyze the cost of adaptation in coastal areas. First, global distributions of projected inundation impacts induced by SLR including astronomical high tide were assessed. Economic damage was estimated on the basis of the econometric relationship between past hydrological disasters, affected population, and per capita GDP using CRED's EM-DAT database. Second, the cost of adaptation was also determined using the cost database and future scenarios. The authors have built a cost database for installed coastal dykes worldwide and applied it to estimating the future cost of adaptation. The unit costs of dyke construction will increase with socio-economic scenario (SSP) such as per capita GDP. Length of vulnerable coastline is calculated by identifying inundation areas using ETOPO1. Future cost was obtained by multiplying the length of vulnerable coastline and the unit cost of dyke construction. Third, the effectiveness of dyke construction was estimated by comparing cases with and without adaptation.As a result, it was found that incremental adaptation cost is lower than economic damage in the cases of SSP1 and SSP3 under RCP scenario, while the cost of adaptation depends on the durability of the coastal dykes.
Liu, Wen; Chen, Weiping; Feng, Qi; Peng, Chi; Kang, Peng
2016-12-01
Cost-benefit analysis is demanded for guiding the plan, design and construction of green infrastructure practices in rapidly urbanized regions. We developed a framework to calculate the costs and benefits of different green infrastructures on stormwater reduction and utilization. A typical community of 54,783 m 2 in Beijing was selected for case study. For the four designed green infrastructure scenarios (green space depression, porous brick pavement, storage pond, and their combination), the average annual costs of green infrastructure facilities are ranged from 40.54 to 110.31 thousand yuan, and the average of the cost per m 3 stormwater reduction and utilization is 4.61 yuan. The total average annual benefits of stormwater reduction and utilization by green infrastructures of the community are ranged from 63.24 to 250.15 thousand yuan, and the benefit per m 3 stormwater reduction and utilization is ranged from 5.78 to 11.14 yuan. The average ratio of average annual benefit to cost of four green infrastructure facilities is 1.91. The integrated facilities had the highest economic feasibility with a benefit to cost ratio of 2.27, and followed by the storage pond construction with a benefit to cost ratio of 2.14. The results suggested that while the stormwater reduction and utilization by green infrastructures had higher construction and maintenance costs, their comprehensive benefits including source water replacements benefits, environmental benefits and avoided cost benefits are potentially interesting. The green infrastructure practices should be promoted for sustainable management of urban stormwater.
Application of multi-criteria decision analysis in selecting of sustainable investments
NASA Astrophysics Data System (ADS)
Kozik, Renata
2017-07-01
Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.
Hatziandreu, E J; Brown, R E; Revicki, D A; Turner, R; Martindale, J; Levine, S; Siegel, J E
1994-03-01
The objective of this study was to model, for patients at risk of recurrent depression, the cost-utility of maintenance therapy with sertraline compared with treatment of acute episodes with dothiepin ('episodic treatment'). Using clinical decision analysis techniques, a Markov state-transition model was constructed to estimate the lifetime costs and quality-adjusted life-years (QALYs) of the 2 therapeutic strategies. The model follows 2 cohorts of 35-year-old women at high risk for recurrent depression over their lifetimes. Model construction and relevant data (probabilities) for performing the analysis were based on existing clinical knowledge. Two physician panels were used to obtain estimates of recurrence probabilities not available in the literature, health utilities, and resource consumption. Costs were obtained from published sources. The baseline analysis showed that it costs 2172 British pounds sterling ($US3692, 1991 currency) to save an additional QALY with sertraline maintenance treatment. Sensitivity analysis showed that the incremental cost-utility ratio ranged from 557 British pounds sterling to 5260 British pounds sterling per QALY. Overall, the resulting ratios are considered to be well within the range of cost-utility ratios that support the adoption and appropriate utilisation of a technology. Based on the study assumptions, long term maintenance treatment with sertraline appears to be clinically and economically justified choice for patients at high risk of recurrent depression.
Characteristics of worker accidents on NYSDOT construction projects.
Mohan, Satish; Zech, Wesley C
2005-01-01
This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.
Satellite power systems (SPS) concept definition study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
System definition studies resulted in a further definition of the reference system using gallium arsenide solar arrays, analysis of alternative subsystem options for the reference concept, preliminary solid state microwave concept studies, and an environmental analysis of laser transmission systems. The special emphasis studies concentrated on satellite construction, satellite construction base definition, satellite construction base construction, and rectenna construction. Major emphasis in the transportation studies was put on definition of a two stage parallel burn, vertical takeoff/horizontal landing concept. The electric orbit transfer vehicle was defined in greater detail. Program definition included cost analyses and schedule definition.
Object Markers at Narrow Bridges on Low Volume Rural Roadways
DOT National Transportation Integrated Search
1998-09-01
Bridges are a necessary part of any roadway system. Their construction requires a more sophisticated engineering design analysis and a higher construction cost than that for the roadways connecting them. Until relatively recently, bridge width on low...
Analysis of the Use of Frame Construction and Modular Additions in City Centre
NASA Astrophysics Data System (ADS)
Milwicz, Roman; Milwicz, Natalia; Dubas, Sebastian
2017-10-01
The living urban fabric can be characterized by the continuous introduction of changes and additions. The city centre is subject to specific restrictions due to the conservation protection and high demand on aesthetics aspect, thermal insulation, construction cost and the ratio of usable area of the building area. This article presents a comparative analysis of traditional construction with light frame and modular construction for the above-mentioned issues. Timber frame structure technology was suggested as effective, economic and innovative solutions for modular additions on buildings in city centres.
Zhou, Xiao-Rong; Huang, Shui-Sheng; Gong, Xin-Guo; Cen, Li-Ping; Zhang, Cong; Zhu, Hong; Yang, Jun-Jing; Chen, Li
2012-04-01
To construct a performance evaluation and management system on advanced schistosomiasis medical treatment, and analyze and evaluate the work of the advanced schistosomiasis medical treatment over the years. By applying the database management technique and C++ programming technique, we inputted the information of the advanced schistosomiasis cases into the system, and comprehensively evaluated the work of the advanced schistosomiasis medical treatment through the cost-effect analysis, cost-effectiveness analysis, and cost-benefit analysis. We made a set of software formula about cost-effect analysis, cost-effectiveness analysis, and cost-benefit analysis. This system had many features such as clear building, easy to operate, friendly surface, convenient information input and information search. It could benefit the performance evaluation of the province's advanced schistosomiasis medical treatment work. This system can satisfy the current needs of advanced schistosomiasis medical treatment work and can be easy to be widely used.
Low Cost Electroencephalographic Acquisition Amplifier to serve as Teaching and Research Tool
Jain, Ankit; Kim, Insoo; Gluckman, Bruce J.
2012-01-01
We describe the development and testing of a low cost, easily constructed electroencephalographic acquisition amplifier for noninvasive Brain Computer Interface (BCI) education and research. The acquisition amplifier is constructed from newly available off-the-shelf integrated circuit components, and readily sends a 24-bit data stream via USB bus to a computer platform. We demonstrate here the hardware’s use in the analysis of a visually evoked P300 paradigm for a choose one-of-eight task. This clearly shows the applicability of this system as a low cost teaching and research tool. PMID:22254699
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... for construction and permanent loans. Only projects that have low loan-to-cost ratios, as specified by... 538 program's debt service coverage ratio requirement of at least 1.15, based on the lender's analysis... CFR Part 3565 RIN-0575-AC80 Continuous Construction-Permanent Loan Guarantees Under the Section 538...
ERIC Educational Resources Information Center
Silva-Ortigoza, R.; Silva-Ortigoza, G.; Hernandez-Guzman, V. M.; Saldana-Gonzalez, G.; Marcelino-Aranda, M.; Marciano-Melchor, M.
2012-01-01
We introduce a dc/dc boost power converter as a didactic prototype intended to support courses on electric circuit analysis experimentally. The corresponding mathematical model is obtained, the converter is designed and an experimental setup is described, constructed and tested. Simplicity of construction as well as low cost of components renders…
Designing for Psychological Change: Individuals’ Reward and Cost Valuations in Weight Management
Blandford, Ann
2014-01-01
Background Knowledge of the psychological constructs that underlie behavior offers valuable design opportunities for persuasive systems. We use the decision theory, which describes how behavior is underpinned by reward-cost valuations, as a framework for investigating such psychological constructs to deliver design objectives for weight management technologies. Objective We applied a decision theory–based analysis in the domain of weight management to understand the rewards and costs that surround individuals’ weight management behaviors, with the aim of uncovering design opportunities for weight management technologies. Methods We conducted qualitative interviews with 15 participants who were or had been trying to lose weight. Thematic analysis was used to extract themes that covered the rewards and costs surrounding weight management behaviors. We supplemented our qualitative study with a quantitative survey of 100 respondents investigating the extent to which they agreed with statements reflecting themes from the qualitative study. Results The primary obstacles to weight management were the rewards associated with unhealthy choices, such as the pleasures of unhealthy foods and unrestricted consumption in social situations, and the significant efforts required to change habits, plan, and exercise. Psychological constructs that supported positive weight management included feeling good after making healthy choices, being good to oneself, experiencing healthy yet still delicious foods, and receiving social support and encouraging messages (although opinions about encouraging messages was mixed). Conclusions A rewards-costs driven enquiry revealed a wide range of psychological constructs that contribute to discouraging and supporting weight management. The constructs extracted from our qualitative study were verified by our quantitative survey, in which the majority of respondents also reported similar thoughts and feelings. This understanding of the rewards and costs surrounding weight management offers a range of new opportunities for the design of weight management technologies that enhance the encouraging factors and alleviate the discouraging ones. PMID:24972304
Cost-Effectiveness Analysis of Diagnosis of Duchenne/Becker Muscular Dystrophy in Colombia.
Atehortúa, Sara C; Lugo, Luz H; Ceballos, Mateo; Orozco, Esteban; Castro, Paula A; Arango, Juan C; Mateus, Heidi E
2018-03-09
To determine the cost-effectiveness ratio of different courses of action for the diagnosis of Duchenne or Becker muscular dystrophy in Colombia. The cost-effectiveness analysis was performed from the Colombian health system perspective. Decision trees were constructed, and different courses of action were compared considering the following tests: immunohistochemistry (IHC), Western blot (WB), multiplex polymerase chain reaction, multiplex ligation-dependent probe amplification (MLPA), and the complete sequencing of the dystrophin gene. The time horizon matched the duration of sample extraction and analysis. Transition probabilities were obtained from a systematic review. Costs were constructed with a type-case methodology using the consensus of experts and the valuation of resources from consulting laboratories and the 2001 Social Security Institute cost manual. Deterministic sensitivity and scenario analyses were performed with one or more unavailable alternatives. Costs were converted from Colombian pesos to US dollars using the 2014 exchange rate. In the base case, WB was the dominant strategy, with a cost of US $419.07 and a sensitivity of 100%. This approach remains the dominant strategy down to a 98.2% sensitivity and while costs do not exceed US $837.38. If WB was not available, IHC had the best cost-effectiveness ratio, followed by MLPA and sequencing. WB is a cost-effective alternative for the diagnosis of patients suspected of having Duchenne or Becker muscular dystrophy in the Colombian health system. The IHC test is rated as the second-best detection method. If these tests are not available, MLPA followed by sequencing would be the most cost-effective alternative. Copyright © 2018. Published by Elsevier Inc.
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
Summit Station Skiway Cost Analysis
2016-07-01
Laboratory (CRREL) U.S. Army Engineer Research and Development Center (ERDC) 72 Lyme Road Hanover, NH 03755-1290 Final Report Approved for...cargo loads. To explore further skiway improvement and cost saving techniques, this report reviews alternative maintenance and construction options...3 2.2 Maintenance
Satellite Power System (SPS) concept definition study (exhibit C)
NASA Technical Reports Server (NTRS)
Haley, G. M.
1979-01-01
The major outputs of the study are the constructability studies which resulted in the definition of the concepts for satellite, rectenna, and satellite construction base construction. Transportation analyses resulted in definition of heavy-lift launch vehicle, electric orbit transfer vehicle, personnel orbit transfer vehicle, and intra-orbit transfer vehicle as well as overall operations related to transportation systems. The experiment/verification program definition resulted in the definition of elements for the Ground-Based Experimental Research and Key Technology plans. These studies also resulted in conceptual approaches for early space technology verification. The cost analysis defined the overall program and cost data for all program elements and phases.
Quantitative Method for Analyzing the Allocation of Risks in Transportation Construction
DOT National Transportation Integrated Search
1979-04-01
The report presents a conceptual model of risk that was developed to analyze the impact on owner's cost of alternate allocations of risk among owner and contractor in mass transit construction. A model and analysis procedure are developed, based on d...
Base compaction specification feasibility analysis.
DOT National Transportation Integrated Search
2012-12-01
The objective of this research is to establish the technical engineering and cost : analysis concepts that will enable WisDOT management to objectively evaluate the : feasibility of switching construction specification philosophies for aggregate base...
ERIC Educational Resources Information Center
Hosker, Bill S.
2018-01-01
A highly simplified variation on the do-it-yourself spectrophotometer using a smartphone's light sensor as a detector and an app to calculate and display absorbance values was constructed and tested. This simple version requires no need for electronic components or postmeasurement spectral analysis. Calibration graphs constructed from two…
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
DOT National Transportation Integrated Search
2012-03-01
This study was undertaken to: 1) apply a benchmarking process to identify best practices within four areas Wisconsin Department of Transportation (WisDOT) construction management and 2) analyze two performance metrics, % Cost vs. % Time, tracked by t...
Cost-benefit evaluation of short-term warranties for hot mix asphalt pavements.
DOT National Transportation Integrated Search
2012-03-01
The purpose of this report is to provide the reader with the ten-year analysis for the cost-benefit of hot mix asphalt projects : constructed using the three and five-year warranty specifications developed by CDOT. There were eight projects evaluated...
Sculpher, M J; Buxton, M J
1993-11-01
The construction of a composite effectiveness measure was explored using clinical data collected routinely in trials of drug therapies for asthma. The measure is the episode-free day (EFD), where an 'episode' is either an asthma attack, the need for rescue medication, sleep disturbance caused by asthma, or an adverse event. The EFD measure was used in a retrospective cost-effectiveness analysis of a previous Phase III controlled clinical trial of formoterol versus salbutamol, in which 145 patients with bronchial asthma were randomised to receive maintenance therapy with either inhaled formoterol or inhaled salbutamol over a 12-week period. Average and incremental cost-effectiveness ratios were assessed for the 2 drugs in terms of the total expected cost of drug plus rescue therapy, and EFD rates. The analysis suggests that, with relatively little addition to clinical data collection, economically and clinically meaningful composite measures can be constructed to assist in making cost-effectiveness comparisons between alternative asthma therapies.
A study in cost analysis of aggregate production as depending on drilling and blasting design
NASA Astrophysics Data System (ADS)
Bilim, Niyazi; Çelik, Arif; Kekeç, Bilgehan
2017-10-01
Since aggregate production has vital importance for many engineering projects-such as construction, highway and plant-mixed concrete production-this study was undertaken to determine how the costs for such production are affected by the design of drilling and blasting processes used. Aggregates are used in the production of concrete and asphalt, which are critical resources for the construction sector. The ongoing population increase and the growth of living standards around the world drive the increasing demand for these products. As demand grows, competition has naturally arisen among producers in the industry. Competition in the market has directly affected prices, which leads to the need for new measures and cost analysis on production costs. The cost calculation is one of the most important parameters in mining activities. Aggregate production operations include drilling, blasting, secondary crushing (if necessary), loading, hauling and crushing-screening, and each of these factors affects cost. In this study, drilling and blasting design parameters (such as hole diameter, hole depth, hole distance and burden) were investigated and evaluated for their effect on the total cost of quarrying these products, based on a particular quarry selected for this research. As the result of evaluation, the parameters actually driving costs have been identified, and their effects on the cost have been determined. In addition, some suggestions are presented regarding production design which may lead to avoiding increased production costs.
26 CFR 1.861-10T - Special allocations of interest expense (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... certain assets that are acquired in integrated financial transaction. Paragraph (d) of this section... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...
26 CFR 1.861-10T - Special allocations of interest expense (temporary).
Code of Federal Regulations, 2014 CFR
2014-04-01
... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...
26 CFR 1.861-10T - Special allocations of interest expense (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...
26 CFR 1.861-10T - Special allocations of interest expense (temporary).
Code of Federal Regulations, 2013 CFR
2013-04-01
... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...
26 CFR 1.861-10T - Special allocations of interest expense (temporary).
Code of Federal Regulations, 2012 CFR
2012-04-01
... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...
Clinical process analysis and activity-based costing at a heart center.
Ridderstolpe, Lisa; Johansson, Andreas; Skau, Tommy; Rutberg, Hans; Ahlfeldt, Hans
2002-08-01
Cost studies, productivity, efficiency, and quality of care measures, the links between resources and patient outcomes, are fundamental issues for hospital management today. This paper describes the implementation of a model for process analysis and activity-based costing (ABC)/management at a Heart Center in Sweden as a tool for administrative cost information, strategic decision-making, quality improvement, and cost reduction. A commercial software package (QPR) containing two interrelated parts, "ProcessGuide and CostControl," was used. All processes at the Heart Center were mapped and graphically outlined. Processes and activities such as health care procedures, research, and education were identified together with their causal relationship to costs and products/services. The construction of the ABC model in CostControl was time-consuming. However, after the ABC/management system was created, it opened the way for new possibilities including process and activity analysis, simulation, and price calculations. Cost analysis showed large variations in the cost obtained for individual patients undergoing coronary artery bypass grafting (CABG) surgery. We conclude that a process-based costing system is applicable and has the potential to be useful in hospital management.
[A cost-benefit analysis of different therapeutic methods in menorrhagia].
Kirschner, R
1995-02-20
When deciding the right forms of treatment for various medical conditions it has been usual to consider medical knowledge, norms and experience. Increasingly, economic factors and principles are being introduced by the management, in the form of health economics and pharmaco-economic analyses, enforced as budgetary cuts and demands for rationalisation and measures to increase efficiency. Economic evaluations require construction of models for analyses. We have used DRG-information, National Health reimbursements and pharmacological retail prices to make a cost-efficiency analysis of treatments of menorrhagia. The analysis showed better cost-efficiency for certain pharmacological treatments than for surgery.
Demystifying first-cost green building premiums in healthcare.
Houghton, Adele; Vittori, Gail; Guenther, Robin
2009-01-01
This study assesses the extent of "first-cost green building construction premiums" in the healthcare sector based on data submitted by and interviews with 13 current LEED-certified and LEED-registered healthcare project teams, coupled with a literature survey of articles on the topics of actual and perceived first-cost premiums associated with green building strategies. This analysis covers both perceived and realized costs across a range of projects in this sector, leading to the following conclusions: Construction first-cost premiums may be lower than is generally perceived, and they appear to be independent of both building size and level of "green" achievement; projects are using financial incentives and philanthropy to drive higher levels of achievement; premiums are decreasing over time; and projects are benefiting from improvements in health and productivity which, although difficult to monetize, are universally valued.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... UMRA, the Agency generally must prepare a written statement, including a cost- benefit analysis, for... projects that have low loan-to-cost ratio, as specified by the Agency in a Notice published periodically in... permanent loans. Only projects that have low loan-to-cost ratios, which will be defined by the Agency in a...
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
NASA Astrophysics Data System (ADS)
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
Cascading costs: an economic nitrogen cycle.
Moomaw, William R; Birch, Melissa B L
2005-09-01
The chemical nitrogen cycle is becoming better characterized in terms of fluxes and reservoirs on a variety of scales. Galloway has demonstrated that reactive nitrogen can cascade through multiple ecosystems causing environmental damage at each stage before being denitrified to N(2). We propose to construct a parallel economic nitrogen cascade (ENC) in which economic impacts of nitrogen fluxes can be estimated by the costs associated with each stage of the chemical cascade. Using economic data for the benefits of damage avoided and costs of mitigation in the Chesapeake Bay basin, we have constructed an economic nitrogen cascade for the region. Since a single ton of nitrogen can cascade through the system, the costs also cascade. Therefore evaluating the benefits of mitigating a ton of reactive nitrogen released needs to consider the damage avoided in all of the ecosystems through which that ton would cascade. The analysis reveals that it is most cost effective to remove a ton of nitrogen coming from combustion since it has the greatest impact on human health and creates cascading damage through the atmospheric, terrestrial, aquatic and coastal ecosystems. We will discuss the implications of this analysis for determining the most cost effective policy option for achieving environmental quality goals.
Cascading costs: an economic nitrogen cycle.
Moomaw, William R; Birch, Melissa B L
2005-12-01
The chemical nitrogen cycle is becoming better characterized in terms of fluxes and reservoirs on a variety of scales. Galloway has demonstrated that reactive nitrogen can cascade through multiple ecosystems causing environmental damage at each stage before being denitrified to N2. We propose to construct a parallel economic nitrogen cascade (ENC) in which economic impacts of nitrogen fluxes can be estimated by the costs associated with each stage of the chemical cascade. Using economic data for the benefits of damage avoided and costs of mitigation in the Chesapeake Bay basin, we have constructed an economic nitrogen cascade for the region. Since a single tonne of nitrogen can cascade through the system, the costs also cascade. Therefore evaluating the benefits of mitigating a tonne of reactive nitrogen released needs to consider the damage avoided in all of the ecosystems through which that tonne would cascade. The analysis reveals that it is most cost effective to remove a tonne of nitrogen coming from combustion since it has the greatest impact on human health and creates cascading damage through the atmospheric, terrestrial, aquatic and coastal ecosystems. We will discuss the implications of this analysis for determining the most cost effective policy option for achieving environmental quality goals.
Columbia County Habitat for Humanity Passive Townhomes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dentz, Jordan; Alaigh, Kunal; Dadia, Devanshi
2016-03-18
Columbia County (New York) Habitat for Humanity built a pair of townhomes to Passive House criteria with the purpose of exploring approaches for achieving Passive House performance and to eventually develop a prototype design for future projects. The project utilized a 2x6 frame wall with a structural insulated panel curtain wall and a ventilated attic over a sealed OSB ceiling air barrier. Mechanical systems include a single head, wall mounted ductless mini-split heat pump in each unit and a heat recovery ventilator. Costs were $26,000 per unit higher for Passive House construction compared with the same home built to ENERGYmore » STAR version 3 specifications, representing about 18% of total construction cost. This report discusses the cost components, energy modeling results and lessons from construction. Two alternative ventilation systems are analyzed: a central system; and, a point-source system with small through-wall units distributed throughout the house. The report includes a design and cost analysis of these two approaches.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-04-01
Columbia County (New York) Habitat for Humanity built a pair of townhomes to Passive House criteria with the purpose of exploring approaches for achieving Passive House performance and to eventually develop a prototype design for future projects. The project utilized a 2x6 frame wall with a structural insulated panel curtain wall and a ventilated attic over a sealed OSB ceiling air barrier. Mechanical systems include a single head, wall mounted ductless mini-split heat pump in each unit and a heat recovery ventilator. Costs were $26,000 per unit higher for Passive House construction compared with the same home built to ENERGYmore » STAR version 3 specifications, representing about 18 percent of total construction cost. This report discusses the cost components, energy modeling results and lessons from construction. Two alternative ventilation systems are analyzed: a central system; and, a point-source system with small through-wall units distributed throughout the house. The report includes a design and cost analysis of these two approaches.« less
Satellite solar power - Will it pay off
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1977-01-01
A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.
Comparison of Navy and Private-Sector Construction Costs
1997-09-01
contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar
L-O-S-T: Logging Optimization Selection Technique
Jerry L. Koger; Dennis B. Webster
1984-01-01
L-O-S-T is a FORTRAN computer program developed to systematically quantify, analyze, and improve user selected harvesting methods. Harvesting times and costs are computed for road construction, landing construction, system move between landings, skidding, and trucking. A linear programming formulation utilizing the relationships among marginal analysis, isoquants, and...
Single- and Multi-Prime Contracting in North Carolina Public Construction.
ERIC Educational Resources Information Center
Bluestein, Frayda S.
1995-01-01
The North Carolina General Assembly directed the State Building Commission to study the comparative costs of multi- and single-prime contracting and report the results to the 1995 General Assembly. Describes the analysis of data collected from governmental units that had awarded construction contracts. Identifies some alternative contracting…
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...
Comparative evaluation of low cost materials as constructed wetland filling media
NASA Astrophysics Data System (ADS)
Pinho, Henrique J. O.; Vaz, Mafalda M.; Mateus, Dina M. R.
2017-11-01
Three waste materials from civil construction activities were assessed as low cost alternative filling materials used in Constructed Wetlands (CW). CW are green processes for wastewater treatment, whose design includes an appropriate selection of vegetation and filling material. The sustainability of such processes may be incremented using recovered wastes as filling materials. The abilities of the materials to support plant growth and to contribute to pollutants removal from wastewater were assessed and compared to expanded clay, a filling usually used in CW design. Statistical analysis, using one-way ANOVA and Welch's ANOVA, demonstrate that limestone fragments are a better choice of filling material than brick fragments and basalt gravel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Arizona. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Hawaii. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Connecticut. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Assessing the cost of a cardiology residency program with a cost construction model.
Franzini, L; Chen, S C; McGhie, A I; Low, M D
1999-09-01
Although the total costs of graduate medical education are difficult to quantify, this information is of great importance in planning over the next decade. A cost construction model was used to quantify the costs of teaching faculty, cardiology fellows' salaries and benefits, overhead (physical plant, equipment, and support staff), and other costs associated with the cardiology residency program at the University of Texas-Houston during the 1996 to 1997 academic year. Surveys of cardiology faculty and fellows, checked by the program director, were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning cardiology fellows' productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The instructional cost of training (cost of didactic, direct clinical supervision, preparation for teaching, and teaching-related administration, plus the support of the teaching program) was estimated at $73,939 per cardiology fellow per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by cardiology fellows, $100,937 per cardiology fellow per year. Sensitivity analysis, with different assumptions on cardiology fellows' productivity and replacement costs, varied the cost estimates but generally represented the cardiology residency program as an asset. Cost construction models can be used as a tool to estimate variations in resource requirements resulting from changes in curriculum or educators' costs. In this residency, the value of the teaching and clinical services provided by cardiology fellows exceeded the cost of the resources used in the educational program.
How do we evaluate the cost of healthcare technology?
NASA Astrophysics Data System (ADS)
Nobel, Joel J.
1994-12-01
Five critical questions apply when evaluating the cost of healthcare technology: Who is asking the question (of how to evaluate healthcare costs)? For what purpose? What is the nature of the decision that must be made? At what state of a technology's development and diffusion are the questions being posed? What type of technology is stimulating the questions? A large number of organizations, both national and international, are engaged in technology assessment, and constructive disagreement improves the overall quality of those assessments. Current cost measurements tools such as cost-utility analysis, cost-benefit analysis, cost- effectiveness analysis, and outcomes research are weak and ineffective. Recently, pharmaceutical manufacturers have adopted more global cost-effectiveness studies. Technology assessments will ultimately focus on examining the relative cost-effectiveness of alternative technologies for a specific pathology or examining the relative cost-effectiveness of alternative technologies for a specific pathology or DRG. In addition to the traditional healthcare facility--hospital, outpatient facility, or group practice, group purchasing organizations are also asking about cost-effectiveness of healthcare. ECRI's SELECTTM process, unlike less effective technology assessments, takes into account real-world user experience data and life-cycle cost analysis in addition to detailed comparisons of technical features and performance.
[A cost-benefit analysis of a Mexican food-support program].
Ventura-Alfaro, Carmelita E; Gutiérrez-Reyes, Juan P; Bertozzi-Kenefick, Stefano M; Caldés-Gómez, Natalia
2011-06-01
Objective Presenting an estimate of a Mexican food-support program (FSP) program's cost transfer ratio (CTR) from start-up (2003) to May 2005. Methods The program's activities were listed by constructing a time allocation matrix to ascertain how much time was spent on each of the program's activities by the personnel so involved. Another cost matrix was also constructed which was completed with information from the program's accountancy records. The program's total cost, activity cost and the value of given FSP transfers were thus estimated. Results Food delivery CRT for 2003, 2004 and 2005 was 0.150, 0.218, 0.230, respectively; cash CTR was 0.132in 2004 and 0.105 in 2005. Conclusion Comparing CTR values according to transfer type is a good way to promote discussion related to this topic; however, the decision for making a transfer does not depend exclusively on efficiency but on both mechanisms' effectiveness.
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
Sizing and Lifecycle Cost Analysis of an Ares V Composite Interstage
NASA Technical Reports Server (NTRS)
Mann, Troy; Smeltzer, Stan; Grenoble, Ray; Mason, Brian; Rosario, Sev; Fairbairn, Bob
2012-01-01
The Interstage Element of the Ares V launch vehicle was sized using a commercially available structural sizing software tool. Two different concepts were considered, a metallic design and a composite design. Both concepts were sized using similar levels of analysis fidelity and included the influence of design details on each concept. Additionally, the impact of the different manufacturing techniques and failure mechanisms for composite and metallic construction were considered. Significant details were included in analysis models of each concept, including penetrations for human access, joint connections, as well as secondary loading effects. The designs and results of the analysis were used to determine lifecycle cost estimates for the two Interstage designs. Lifecycle cost estimates were based on industry provided cost data for similar launch vehicle components. The results indicated that significant mass as well as cost savings are attainable for the chosen composite concept as compared with a metallic option.
Efficiency of using construction machines when strengthening foundation soils
NASA Astrophysics Data System (ADS)
Turchin, Vadim; Yudina, Ludmila; Ivanova, Tatyana; Zhilkina, Tatyana; Sychugove, Stanislav; Mackevicius, Rimantas; Danutė, Slizyte
2017-10-01
The article describes the efficiency of using construction machines when strengthening foundation base soils, as one of the ways to solve the problem of reducing and optimizing costs during construction. The analysis is presented in regard to inspection results of the soil bodies in the pile foundation base of “School of general education No. 5 in the town of Malgobek” of the republic of Ingushetia. Economical efficiency through reducing the duration of construction due to the automation of production is calculated.
User costs as one of main advantages of precast concrete application in highway construction
NASA Astrophysics Data System (ADS)
Tomek, Radan
2017-09-01
Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing to construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. 12 refs., 5 tabs.« less
Occupational injury costs and alternative employment in construction trades.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Men, Yurong; Haile, Elizabeth
2007-11-01
To present the costs of fatal and non-fatal days-away-from-work injuries in 50 construction occupations. Our results also provide indirect evidence on the cost exposure of alternative construction workers such as independent contractors, on-call or day labor, contract workers, and temporary workers. We combine data from the Bureau of Labor Statistics on average annual incidence from 2000 to 2002 with updated per-case costs from an existing cost model for occupational injuries. The Current Population Survey provides data on the percentage of alternative construction workers. Construction laborers and carpenters were the two costliest occupations, with 40% of the industry's injury costs. The 10 costliest construction occupations also have a high percentage of alternative workers. The construction industry has both a high rate of alternative employment and high costs of work injury. Alternative workers, often lacking workers' compensation, are especially exposed to injury costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
NASA Astrophysics Data System (ADS)
Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.
2018-05-01
Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.
Economical solar-heating for homes
NASA Technical Reports Server (NTRS)
Allred, J. W.; Shinn, J. M., Jr.; Kirby, C. E.; Barringer, S. R.
1977-01-01
Do-it-yourself supplementary solar-heating system is available for purchase at approximately $2,000. Report describes design, construction, testing, and economic analysis of low-cost solar heating system.
2012-12-01
C2 Command and Control CAIG Cost Analysis Improvement Group CAS Close Air Support CASA Construcciones Aeronáuticas SA CLS Contract...Commercially Available Off-the-Shelf Commercially available off-the shelf (COTS) is defined as any item of supply (including construction material...uses are found for old weapons that were constructed for use in industrial war against soldiers and heavy armament. 6. The sides are mostly non
Life-cycle cost-benefit analysis of extensive vegetated roof systems.
Carter, Timothy; Keeler, Andrew
2008-05-01
The built environment has been a significant cause of environmental degradation in the previously undeveloped landscape. As public and private interest in restoring the environmental integrity of urban areas continues to increase, new construction practices are being developed that explicitly value beneficial environmental characteristics. The use of vegetation on a rooftop--commonly called a green roof--as an alternative to traditional roofing materials is an increasingly utilized example of such practices. The vegetation and growing media perform a number of functions that improve environmental performance, including: absorption of rainfall, reduction of roof temperatures, improvement in ambient air quality, and provision of urban habitat. A better accounting of the green roof's total costs and benefits to society and to the private sector will aid in the design of policy instruments and educational materials that affect individual decisions about green roof construction. This study uses data collected from an experimental green roof plot to develop a benefit cost analysis (BCA) for the life cycle of extensive (thin layer) green roof systems in an urban watershed. The results from this analysis are compared with a traditional roofing scenario. The net present value (NPV) of this type of green roof currently ranges from 10% to 14% more expensive than its conventional counterpart. A reduction of 20% in green roof construction cost would make the social NPV of the practice less than traditional roof NPV. Considering the positive social benefits and relatively novel nature of the practice, incentives encouraging the use of this practice in highly urbanized watersheds are strongly recommended.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Texas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Texas. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Minnesota. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Indiana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Indiana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Florida. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Maine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Maine. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Percutaneous Trigger Finger Release: A Cost-effectiveness Analysis.
Gancarczyk, Stephanie M; Jang, Eugene S; Swart, Eric P; Makhni, Eric C; Kadiyala, Rajendra Kumar
2016-07-01
Percutaneous trigger finger releases (TFRs) performed in the office setting are becoming more prevalent. This study compares the costs of in-hospital open TFRs, open TFRs performed in ambulatory surgical centers (ASCs), and in-office percutaneous releases. An expected-value decision-analysis model was constructed from the payer perspective to estimate total costs of the three competing treatment strategies for TFR. Model parameters were estimated based on the best available literature and were tested using multiway sensitivity analysis. Percutaneous TFR performed in the office and then, if needed, revised open TFR performed in the ASC, was the most cost-effective strategy, with an attributed cost of $603. The cost associated with an initial open TFR performed in the ASC was approximately 7% higher. Initial open TFR performed in the hospital was the least cost-effective, with an attributed cost nearly twice that of primary percutaneous TFR. An initial attempt at percutaneous TFR is more cost-effective than an open TFR. Currently, only about 5% of TFRs are performed in the office; therefore, a substantial opportunity exists for cost savings in the future. Decision model level II.
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Vermont
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Vermont. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Michigan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Michigan. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Alabama
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Alabama. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Hampshire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Hampshire. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Mexico. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Colorado. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Washington
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Washington. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Montana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the District of Columbia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the District of Columbia. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Massachusetts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Massachusetts. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Oregon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Oregon. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Wisconsin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Wisconsin. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Ohio
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Ohio. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of South Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of South Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of North Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of North Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Iowa
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Iowa. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Costs of occupational injuries in construction in the United States.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong
2007-11-01
This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.
Cost segregation of assets offers tax benefits.
Grant, D A
2001-04-01
A cost-segregation study is an asset-reclassification strategy that accelerates tax-depreciation deductions. By using this strategy, healthcare facility owners can lower their current income-tax liability and increase current cash flow. Simply put, certain real estate is reclassified from long-lived real property to shorter-lived personal property for depreciation purposes. Depreciation deductions for the personal property then can be greatly accelerated, thereby producing greater present-value tax savings. An analysis of costs can be conducted from either detailed construction records, when such records are available, or by using qualified appraisers, architects, or engineers to perform the allocation analysis.
Bai, Xiao-ping; Zhang, Xi-wei
2013-01-01
Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.
ERIC Educational Resources Information Center
Wendling, Wayne
This report is divided into four sections. Section 1 is a short discussion of the economic theory underlying the construction of the cost of education index and an example of how the index is calculated. Also presented are descriptions of the factors included in the statistical analysis to control for quality, quantity, and cost differences and…
LOGAM (Logistic Analysis Model). Volume 2. Users Manual.
1982-08-01
as opposed to simulation models which represent a system’s behavior as a function of time. These latter classes of models are often complex. They...includes the cost of ammunition and missiles comsumed by the system being costed during unit training. Excluded is the cost of ammunition consumed during...data. The results obtained from sensitivity testing may be used to construct graphs which display the behavior of the maintenance concept over the range
A Cost-Benefit Analysis for Per-Student Expenditures and Academic Achievement
ERIC Educational Resources Information Center
Womack, Sid T.; Roberts, Kerry; Bell, C. David; Womack, Karen
2015-01-01
Cost-benefit correlations have been subject to "selective sampling" in the media. Usually extremes of data from a very few high-funding and low-funding states are cited in the media to construct the case that there is no relationship between economic inputs and academic outputs. This study, using average per-pupil expenditures and ACT…
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
NASA Astrophysics Data System (ADS)
Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.
2017-11-01
Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
1975-03-01
construction and operation of the canal. The minimal advantages offered by the canal over the existing passages through the Malay Peninsula-Indonesian...was analyzed with respect to the advantages and costs that would result from U.S. participa- tion in the construction and operation of the canal. The...Present Status of the Canal -------------- 28 3. Motivating Factors for the Canal ..........- 31 4. Construction ----------------------------- 34 5
The Dynairship. [structural design criteria and feasibility analysis of an airplane - airship
NASA Technical Reports Server (NTRS)
Miller, W. M., Jr.
1975-01-01
A feasibility analysis for the construction and use of a combination airplane-airship named 'Dynairship' is undertaken. Payload capacities, fuel consumption, and the structural design of the craft are discussed and compared to a conventional commercial aircraft (a Boeing 747). Cost estimates of construction and operation of the craft are also discussed. The various uses of the craft are examined (i.e, in police work, materials handling, and ocean surveillance), and aerodynamic configurations and photographs are shown.
Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.
Value engineering awareness study for sustainable construction in Malaysia
NASA Astrophysics Data System (ADS)
U, Fathoni; M, Zakaria C.; O, Rohayu C.
2013-06-01
Construction process has often been described as a highly complex process because of the number of disciplines involved during the conceptual, design and construction stage. With the emergence of latest technology and concern for environment, increasing attention in construction industry is given on sustainability. Balance in quality and sustainability has become a major challenge to the construction industry. This paper presents a study that has conducted to determine the acceptance and application of Value Engineering (VE) and Life Cycle Cost Analysis (LCCA) in Malaysia construction industry. A set of questionnaire have distributed to different practitioners in construction industry and the result has reflect the fact that the application of VE and LCCA are still very low.
Construction cost forecast model : model documentation and technical notes.
DOT National Transportation Integrated Search
2013-05-01
Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...
Trends in highway construction costs in Louisiana : technical summary.
DOT National Transportation Integrated Search
1999-09-01
The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...
An Ion-Selective Electrode/Flow-Injection Analysis Experiment: Determination of Potassium in Serum.
ERIC Educational Resources Information Center
Meyerhoff, Mark E.; Kovach, Paul M.
1983-01-01
Describes a low-cost, senior-level, instrumental analysis experiment in which a home-made potassium tubular flow-through electrode is constructed and incorporated into a flow injection analysis system (FIA). Also describes experiments for evaluating the electrode's response properties, examining basic FIA concepts, and determining potassium in…
Costs of Occupational Injuries in Construction in the United States
Waehrer, Geetha M.; Dong, Xiuwen S.; Miller, Ted; Haile, Elizabeth; Men, Yurong
2008-01-01
This paper presents costs of fatal and non-fatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and non-fatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry’s total fatal and non-fatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs. PMID:17920850
48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...
Zhao, Yueyuan; Zhang, Xuefeng; Zhu, Fengcai; Jin, Hui; Wang, Bei
2016-08-02
Objective To estimate the cost-effectiveness of hepatitis E vaccination among pregnant women in epidemic regions. Methods A decision tree model was constructed to evaluate the cost-effectiveness of 3 hepatitis E virus vaccination strategies from societal perspectives. The model parameters were estimated on the basis of published studies and experts' experience. Sensitivity analysis was used to evaluate the uncertainties of the model. Results Vaccination was more economically effective on the basis of the incremental cost-effectiveness ratio (ICER< 3 times China's per capital gross domestic product/quality-adjusted life years); moreover, screening and vaccination had higher QALYs and lower costs compared with universal vaccination. No parameters significantly impacted ICER in one-way sensitivity analysis, and probabilistic sensitivity analysis also showed screening and vaccination to be the dominant strategy. Conclusion Screening and vaccination is the most economical strategy for pregnant women in epidemic regions; however, further studies are necessary to confirm the efficacy and safety of the hepatitis E vaccines.
48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...
Utilities Cost Comparison Analysis between a Public Work Center and the Non-DoD Sector
1992-12-01
construction, consider innovative financing and 14 management arrangements (e.g. cost-sharing, public-private venture, leasing). Integrate...and services by financing all incurred costs. 27 Cash is put back into the working capital fund when customers pay cash from their O&M,N funds for the...firms, and other significantly sized business firms. The actual participants of the study may or may not be included in this listing. Disneyland was
External risk factors affecting construction costs
NASA Astrophysics Data System (ADS)
Mubarak, Husin, Saiful; Oktaviati, Mutia
2017-11-01
Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. The following research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story singlemore » family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
Mburu, Njenga; Tebitendwa, Sylvie M; van Bruggen, Johan J A; Rousseau, Diederik P L; Lens, Piet N L
2013-10-15
The performance, effluent quality, land area requirement, investment and operation costs of a full-scale waste stabilization pond (WSP) and a pilot scale horizontal subsurface flow constructed wetland (HSSF-CW) at Jomo Kenyatta University of Agriculture and Technology (JKUAT) were investigated between November 2010 to January 2011. Both systems gave comparable medium to high levels of organic matter and suspended solids removal. However, the WSP showed a better removal for Total Phosphorus (TP) and Ammonium (NH4(+)-N). Based on the population equivalent calculations, the land area requirement per person equivalent of the WSP system was 3 times the area that would be required for the HSSF-CW to treat the same amount of wastewater. The total annual cost estimates consisting of capital, operation and maintenance (O&M) costs were comparable for both systems. However, the evaluation of the capital cost of either system showed that it is largely influenced by the size of the population served, local cost of land and the construction materials involved. Hence, one can select either system in terms of treatment efficiency. When land is available other factor including the volume of wastewater or the investment, and O&M costs determine the technology selection. Copyright © 2013 Elsevier Ltd. All rights reserved.
Cost Analysis of Renewable Energy-Based Microgrids
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giraldez Miner, Julieta I; Singh, Shruti; Gao, David Wenzhong
This paper analyzes the cost composition of microgrid construction as well as the influencing key factors. The Microgrid Cost Study aims at identifying the average cost of a typical microgrid project. The project is limited to the vicinity of U.S. and hence takes into account of only existing microgrid projects in U.S. The project's objective is to find cost of microgrid and its individual components for next 5 years. This will help in R&D for future microgrid projects as well as help investors/developers/researchers get an idea about the cost of their projects that they might want to start in nearmore » future.« less
Boyer, Nicole R S; Boyd, Kathleen A; Turner-Halliday, Fiona; Watson, Nicholas; Minnis, Helen
2014-12-10
Children with maltreatment associated psychiatric problems are at increased risk of developing behavioural or mental health disorders. Dyadic Developmental Psychotherapy (DDP) was proposed as treatment for children with maltreatment histories in the USA, however, being new to the UK little is known of its effectiveness or cost-effectiveness. As part of an exploratory study, this paper explores the feasibility of undertaking economic analysis of DDP in the UK. Feasibility for economic analysis was determined by ensuring such analysis could meet key criteria for economic evaluation. Phone interviews were conducted with professionals (therapists trained and accredited or in the process of becoming accredited DDP practitioners). Three models were developed to represent alternative methods of DDP service delivery. Once appropriate comparators were determined, economic scenarios were constructed. Cost analyses were undertaken from a societal perspective. Finally, appropriate outcome measurement was explored through clinical opinion, literature and further discussions with clinical experts. Three DDP models were constructed: DDP Full-Basic, DDP Home-Based and DDP Long-Term. Two potential comparator interventions were identified and defined as Consultation with Carers and Individual Psychotherapy. Costs of intervention completion per case were estimated to be: £6,700 (DDP Full-Basic), £7,100 (Consultations with Carers), £7,200 (DDP Home-Based), £11,400 (Individual Psychotherapy) and £14,500 (DDP Long-Term). None of the models of service delivery were found to currently measure effectiveness consistently. The Strengths and Difficulties Questionnaire (SDQ) was deemed an appropriate primary outcome measure, however, it does not cover all disorders DDP intends to treat and the SDQ is not a direct measure of health gain. Inclusion of quality of life measurement is required for comprehensive economic analysis. Economic analysis of DDP in the UK is feasible if vital next steps are taken to measure intervention outcomes consistently, ideally with a quality of life measurement. An economic analysis using the models constructed could determine the potential cost-effectiveness of DDP in the UK and identify the most efficient mode of service delivery.
Clinical process cost analysis.
Marrin, C A; Johnson, L C; Beggs, V L; Batalden, P B
1997-09-01
New systems of reimbursement are exerting enormous pressure on clinicians and hospitals to reduce costs. Using cheaper supplies or reducing the length of stay may be a satisfactory short-term solution, but the best strategy for long-term success is radical reduction of costs by reengineering the processes of care. However, few clinicians or institutions know the actual costs of medical care; nor do they understand, in detail, the activities involved in the delivery of care. Finally, there is no accepted method for linking the two. Clinical process cost analysis begins with the construction of a detailed flow diagram incorporating each activity in the process of care. The cost of each activity is then calculated, and the two are linked. This technique was applied to Diagnosis Related Group 75 to analyze the real costs of the operative treatment of lung cancer at one institution. Total costs varied between $6,400 and $7,700. The major driver of costs was personnel time, which accounted for 55% of the total. Forty percent of the total cost was incurred in the operating room. The cost of care decreased progressively during hospitalization. Clinical process cost analysis provides detailed information about the costs and processes of care. The insights thus obtained may be used to reduce costs by reengineering the process.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
... analysis of cost and price data submitted by Huvis on April 16, 2010, April 27, 2010 and May 28, 2010. See... the NV. We calculated EP, NV, constructed value, and the cost of production, based on the same... company(ies) involved in the transaction. Id. Cash Deposit Rates The following antidumping duty deposits...
Highway Cost Index Estimator Tool
DOT National Transportation Integrated Search
2017-10-01
To plan and program highway construction projects, the Texas Department of Transportation requires accurate construction cost data. However, due to the number of, and uncertainty of, variables that affect highway construction costs, estimating future...
A cost comparison of traditional drainage and SUDS in Scotland.
Duffy, A; Jefferies, C; Waddell, G; Shanks, G; Blackwood, D; Watkins, A
2008-01-01
The Dunfermline Eastern Expansion (DEX) is a 350 ha mixed development which commenced in 1996. Downstream water quality and flooding issues necessitated a holistic approach to drainage planning and the site has become a European showcase for the application of Sustainable Urban Drainage Systems (SUDS). However, there is minimal data available regarding the real costs of operating and maintaining SUDS to ensure they continue to perform as per their design function. This remains one of the primary barriers to the uptake and adoption of SUDS. This paper reports on what is understood to be the only study in the UK where actual costs of constructing and maintaining SUDS have been compared to an equivalent traditional drainage solution. To compare SUDS costs with traditional drainage, capital and maintenance costs of underground storage chambers of analogous storage volumes were estimated. A whole life costing methodology was then applied to data gathered. The main objective was to produce a reliable and robust cost comparison between SUDS and traditional drainage. The cost analysis is supportive of SUDS and indicates that well designed and maintained SUDS are more cost effective to construct, and cost less to maintain than traditional drainage solutions which are unable to meet the environmental requirements of current legislation. (c) IWA Publishing 2008.
Residential building codes, affordability, and health protection: a risk-tradeoff approach.
Hammitt, J K; Belsky, E S; Levy, J I; Graham, J D
1999-12-01
Residential building codes intended to promote health and safety may produce unintended countervailing risks by adding to the cost of construction. Higher construction costs increase the price of new homes and may increase health and safety risks through "income" and "stock" effects. The income effect arises because households that purchase a new home have less income remaining for spending on other goods that contribute to health and safety. The stock effect arises because suppression of new-home construction leads to slower replacement of less safe housing units. These countervailing risks are not presently considered in code debates. We demonstrate the feasibility of estimating the approximate magnitude of countervailing risks by combining the income effect with three relatively well understood and significant home-health risks. We estimate that a code change that increases the nationwide cost of constructing and maintaining homes by $150 (0.1% of the average cost to build a single-family home) would induce offsetting risks yielding between 2 and 60 premature fatalities or, including morbidity effects, between 20 and 800 lost quality-adjusted life years (both discounted at 3%) each year the code provision remains in effect. To provide a net health benefit, the code change would need to reduce risk by at least this amount. Future research should refine these estimates, incorporate quantitative uncertainty analysis, and apply a full risk-tradeoff approach to real-world case studies of proposed code changes.
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...
Environmental trade-offs of tunnels vs cut-and-cover subways
Walton, M.
1978-01-01
Heavy construction projects in cities entail two kinds of cost - internal cost, which can be defined in terms of payments from one set of parties to another, and external cost, which is the cost borne by the community at large as the result of disutilities entailed in construction and operation. Environmental trade-offs involve external costs, which are commonly difficult to measure. Cut-and-cover subway construction probably entails higher external and internal cost than deep tunnel construction in many urban geological environments, but uncertainty concerning the costs and environmental trade-offs of tunneling leads to limited and timid use of tunneling by American designers. Thus uncertainty becomes a major trade-off which works against tunneling. The reverse is true in Sweden after nearly 30 years of subway construction. Econometric methods for measuring external costs exist in principle, but are limited in application. Economic theory based on market pressure does not address the real problem of urban environmental trade-offs. Nevertheless, the problem of uncertainty can be addressed by comparative studies of estimated and as-built costs of cut-and-cover vs tunnel projects and a review of environmental issues associated with such construction. Such a study would benefit the underground construction industry and the design of transportation systems. It would also help solve an aspect of the urban problem. ?? 1978.
NASA Technical Reports Server (NTRS)
Eggert, W. S.
1982-01-01
A low cost wind turbine blade based on a stainless steel fiberglass foam Budd blade design concept, was evaluated for its principle characteristics, low cost features, and its advantages and disadvantages. A blade structure was designed and construction methods and materials were selected. A complete blade tooling concepts, various technical and economic analysis, and evaluations of the blade design were performed. A comprehensive fatigue test program is conducted to provide data to verify the design stress allowables.
1991-10-01
culd coinpensate loser and The bulk of project costs are generallye c aInipr:vs :ocii".. ... .... A incurred during the construction period. Benefits... cost he would be willing to that each fisherman would produce at each possible incur ) to catch the 1,000 pounds of fish is $4,000. price . Nonetheless...neutrality, enabling them to use expected annual damages as the measure Project costs are incurred primarily at the time of a beneficiary’s willingness
Improved, low cost inorganic-organic separators for rechargeable silver-zinc batteries
NASA Technical Reports Server (NTRS)
Sheibley, D. W.
1979-01-01
Several flexible, low-cost inorganic-organic separators with performance characteristics and cycle life equal to, or better than, the Lewis Research Center Astropower separator were developed. These new separators can be made on continuous-production equipment at about one-fourth the cost of the Astropower separator produced the same way. In test cells, these new separators demonstrate cycle life improvement, acceptable operating characteristics, and uniform current density. The various separator formulas, test cell construction, and data analysis are described.
1998-04-28
be discussed. 2.1 ECONOMIC REPLACEMENT THEORY Decisions about heavy equipment should be made based on sound economic principles , not emotions...Life) will be less than L*. The converse is also true. 2.1.3 The Repair Limit Theory A different way of looking at the economic replacement decision...Summary Three different economic models have been reviewed in this section. The output of each is distinct. One seeks to minimize costs, one seeks to
NASA Astrophysics Data System (ADS)
Eggert, W. S.
1982-10-01
A low cost wind turbine blade based on a stainless steel fiberglass foam Budd blade design concept, was evaluated for its principle characteristics, low cost features, and its advantages and disadvantages. A blade structure was designed and construction methods and materials were selected. A complete blade tooling concepts, various technical and economic analysis, and evaluations of the blade design were performed. A comprehensive fatigue test program is conducted to provide data to verify the design stress allowables.
Crushed cement concrete substitution for construction aggregates; a materials flow analysis
Kelly, Thomas
1998-01-01
An analysis of the substitution of crushed cement concrete for natural construction aggregates is performed by using a materials flow diagram that tracks all material flows into and out of the cement concrete portion of the products made with cement concrete: highways, roads, and buildings. Crushed cement concrete is only one of the materials flowing into these products, and the amount of crushed cement concrete substituted influences the amount of other materials in the flow. Factors such as availability and transportation costs, as well as physical properties, that can affect stability and finishability, influence whether crushed cement concrete or construction aggregates should be used or predominate for a particular end use.
Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.
ERIC Educational Resources Information Center
Bilginsoy, Cihan; Philips, Peter
2000-01-01
Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…
Quanbeck, Andrew; Lang, Katharine; Enami, Kohei; Brown, Richard L
2010-02-01
A previous cost-benefit analysis found Screening, Brief Intervention, and Referral to Treatment (SBIRT) to be cost-beneficial from a societal perspective. This paper develops a cost-benefit model that includes the employer's perspective by considering the costs of absenteeism and impaired presenteeism due to problem drinking. We developed a Monte Carlo simulation model to estimate the costs and benefits of SBIRT implementation to an employer. We first presented the likely costs of problem drinking to a theoretical Wisconsin firm that does not currently provide SBIRT services. We then constructed a cost-benefit model in which the firm funds SBIRT for its employees. The net present value of SBIRT adoption was computed by comparing costs due to problem drinking both with and without the program. When absenteeism and impaired presenteeism costs were considered from the employer's perspective, the net present value of SBIRT adoption was $771 per employee. We concluded that implementing SBIRT is cost-beneficial from the employer's perspective and recommend that Wisconsin employers consider covering SBIRT services for their employees.
Belowground advantages in construction cost facilitate a cryptic plant invasion
Caplan, Joshua S.; Wheaton, Christine N.; Mozdzer, Thomas J.
2014-01-01
The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. PMID:24938305
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
Galactic and Solar Cosmic Ray Shielding in Deep Space
NASA Technical Reports Server (NTRS)
Wilson, John W.; Cucinotta, Francis A.; Tai, H.; Simonsen, Lisa C.; Shinn, Judy L.; Thibeault, Shelia; Kim, M. Y.
1997-01-01
An analysis of the radiation hazards in support of NASA deep space exploration activities is presented. The emphasis is on materials required for radiation protection shielding. Aluminum has been found to be a poor shield material when dose equivalent is used with exposure limits for low Earth orbit (LEO) as a guide for shield requirements. Because the radiation issues are cost related-the parasitic shield mass has high launch costs, the use of aluminum as a basic construction material is clearly not cost-effective and alternate materials need to be developed. In this context, polyethylene is examined as a potentially useful material and demonstrates important advantages as an alternative to aluminum construction. Although polyethylene is useful as a shield material, it may not meet other design criteria (strength, stability, thermal); other polymer materials must be examined.
Modern methods of cost saving of the production activity in construction
NASA Astrophysics Data System (ADS)
Silka, Dmitriy
2017-10-01
Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.
A cost-construction model to assess the total cost of an anesthesiology residency program.
Franzini, L; Berry, J M
1999-01-01
Although the total costs of graduate medical education are difficult to quantify, this information may be of great importance for health policy and planning over the next decade. This study describes the total costs associated with the residency program at the University of Texas--Houston Department of Anesthesiology during the 1996-1997 academic year. The authors used cost-construction methodology, which computes the cost of teaching from information on program description, resident enrollment, faculty and resident salaries and benefits, and overhead. Surveys of faculty and residents were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning resident productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The cost of resident training (cost of didactic teaching, direct clinical supervision, teaching-related preparation and administration, plus the support of the teaching program) was estimated at $75,070 per resident per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by residents, $103,436 per resident per year. Sensitivity analysis, with different assumptions regarding resident replacement cost and reimbursement rates, varied the cost estimates but generally identified the anesthesiology residency program as a financial asset. In most scenarios, the value of the teaching and clinical services provided by residents exceeded the cost of the resources used in the educational program.
ERIC Educational Resources Information Center
Sung, Kyung Hee; Noh, Eun Hee; Chon, Kyong Hee
2017-01-01
With increased use of constructed response items in large scale assessments, the cost of scoring has been a major consideration (Noh et al. in KICE Report RRE 2012-6, 2012; Wainer and Thissen in "Applied Measurement in Education" 6:103-118, 1993). In response to the scoring cost issues, various forms of automated system for scoring…
ERIC Educational Resources Information Center
Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.
This pamphlet offers a preview of information services available from Solcost, a research and development project. The first section explains that Solcost calculates system and costs performance for solar heated and cooled new and retrofit constructions, such as residential buildings and single zone commercial buildings. For a typical analysis,…
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
NASA Astrophysics Data System (ADS)
Qi, Wei
2017-11-01
Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.
Francis, Tittu; Washington, Travis; Srivastava, Karan; Moutzouros, Vasilios; Makhni, Eric C; Hakeos, William
2017-11-01
Tension band wiring (TBW) and locked plating are common treatment options for Mayo IIA olecranon fractures. Clinical trials have shown excellent functional outcomes with both techniques. Although TBW implants are significantly less expensive than a locked olecranon plate, TBW often requires an additional operation for implant removal. To choose the most cost-effective treatment strategy, surgeons must understand how implant costs and return to the operating room influence the most cost-effective strategy. This cost-effective analysis study explored the optimal treatment strategies by using decision analysis tools. An expected-value decision tree was constructed to estimate costs based on the 2 implant choices. Values for critical variables, such as implant removal rate, were obtained from the literature. A Monte Carlo simulation consisting of 100,000 trials was used to incorporate variability in medical costs and implant removal rates. Sensitivity analysis and strategy tables were used to show how different variables influence the most cost-effective strategy. TBW was the most cost-effective strategy, with a cost savings of approximately $1300. TBW was also the dominant strategy by being the most cost-effective solution in 63% of the Monte Carlo trials. Sensitivity analysis identified implant costs for plate fixation and surgical costs for implant removal as the most sensitive parameters influencing the cost-effective strategy. Strategy tables showed the most cost-effective solution as 2 parameters vary simultaneously. TBW is the most cost-effective strategy in treating Mayo IIA olecranon fractures despite a higher rate of return to the operating room. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.
Automatic Match between Delimitation Line and Real Terrain Based on Least-Cost Path Analysis
NASA Astrophysics Data System (ADS)
Feng, C. Q.; Jiang, N.; Zhang, X. N.; Ma, J.
2013-11-01
Nowadays, during the international negotiation on separating dispute areas, manual adjusting is lonely applied to the match between delimitation line and real terrain, which not only consumes much time and great labor force, but also cannot ensure high precision. Concerning that, the paper mainly explores automatic match between them and study its general solution based on Least -Cost Path Analysis. First, under the guidelines of delimitation laws, the cost layer is acquired through special disposals of delimitation line and terrain features line. Second, a new delimitation line gets constructed with the help of Least-Cost Path Analysis. Third, the whole automatic match model is built via Module Builder in order to share and reuse it. Finally, the result of automatic match is analyzed from many different aspects, including delimitation laws, two-sided benefits and so on. Consequently, a conclusion is made that the method of automatic match is feasible and effective.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
Replica Approach for Minimal Investment Risk with Cost
NASA Astrophysics Data System (ADS)
Shinzato, Takashi
2018-06-01
In the present work, the optimal portfolio minimizing the investment risk with cost is discussed analytically, where an objective function is constructed in terms of two negative aspects of investment, the risk and cost. We note the mathematical similarity between the Hamiltonian in the mean-variance model and the Hamiltonians in the Hopfield model and the Sherrington-Kirkpatrick model, show that we can analyze this portfolio optimization problem by using replica analysis, and derive the minimal investment risk with cost and the investment concentration of the optimal portfolio. Furthermore, we validate our proposed method through numerical simulations.
Central American Tactical Airlift Wing
2017-03-17
will examine the airlift demands for Central America. Then it will examine the success of the HAW in Europe. Next, cost analysis will illustrate the...feasibility of a collaborative airlift wing in Central America. Finally, we will offer a proposal for the construct of the Tactical Airlift Wing...been unable to perform outside of the HAW construct . In the same way that the HAW provides heavy airlift to partner nations that would otherwise be
Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272
DOT National Transportation Integrated Search
2009-12-22
One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...
Naing, Cho; Poovorawan, Yong; Mak, Joon Wah; Aung, Kyan; Kamolratankul, Pirom
2015-06-01
The present study aimed to assess the cost-utility analysis of using an adjunctive recombinant activated factor VIIa (rFVIIa) in children for controlling life-threatening bleeding in dengue haemorrhagic fever (DHF)/dengue shock syndrome (DSS). We constructed a decision-tree model, comparing a standard care and the use of an additional adjuvant rFVIIa for controlling life-threatening bleeding in children with DHF/DSS. Cost and utility benefit were estimated from the societal perspective. The outcome measure was cost per quality-adjusted life years (QALYs). Overall, treatment with adjuvant rFVIIa gained QALYs, but the total cost was higher. The incremental cost-utility ratio for the introduction of adjuvant rFVIIa was $4241.27 per additional QALY. Sensitivity analyses showed the utility value assigned for calculation of QALY was the most sensitive parameter. We concluded that despite high cost, there is a role for rFVIIa in the treatment of life-threatening bleeding in patients with DHF/DSS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, K.; Paramonov, D.
2002-07-01
IRIS (International Reactor Innovative and Secure) is a small to medium advanced light water cooled modular reactor being developed by an international consortium led by Westinghouse/BNFL. This reactor design is specifically aimed at utilities looking to install new (or replacement) nuclear capacity to match market demands, or at developing countries for their distributed power needs. To determine the optimal configuration for IRIS, analysis was undertaken to establish Generation Costs ($/MWh) and Internal Rate of Return (IRR %) to the Utility at alternative power ratings. This was then combined with global market projections for electricity demand out to 2030, segmented intomore » key geographical regions. Finally this information is brought together to form insights, conclusions and recommendations regarding the optimal design. The resultant analysis reveals a single module sized at 335 MWe, with a construction period of 3 years and a 60-year plant life. Individual modules can be installed in a staggered fashion (3 equivalent to 1005 MWe) or built in pairs (2 sets of twin units' equivalent to 1340 MWe). Uncertainty in Market Clearing Price for electricity, Annual Operating Costs and Construction Costs primarily influence lifetime Net Present Values (NPV) and hence IRR % for Utilities. Generation Costs in addition are also influenced by Fuel Costs, Plant Output, Plant Availability and Plant Capacity Factor. Therefore for a site based on 3 single modules, located in North America, Generations Costs of 28.5 $/MWh are required to achieve an IRR of 20%, a level which enables IRIS to compete with all other forms of electricity production. Plant size is critical to commercial success. Sustained (lifetime) high factors for Plant Output, Availability and Capacity Factor are required to achieve a competitive advantage. Modularity offers Utilities the option to match their investments with market conditions, adding additional capacity as and when the circumstances are right. Construction schedule needs to be controlled. There is a clear trade-off between reducing financing charges and optimising revenue streams. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison, T. J.
2014-02-01
The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well knownmore » based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs.« less
ERIC Educational Resources Information Center
Gopal, Venkatesh; Klosowiak, Julian L.; Jaeger, Robert; Selimkhanov, Timur; Hartmann, Mitra J. Z.
2008-01-01
We describe the construction and operation of three low-cost schlieren imaging systems that can be fabricated using surplus optics and 80/20, an aluminium extrusion based construction system. Each system has a different optical configuration. The low cost and ease of construction makes these systems highly suitable for high-school and…
Chen, Neal C; Shauver, Melissa J; Chung, Kevin C
2011-11-01
We undertook a cost-utility analysis to compare traditional fasciectomy for Dupuytren with 2 new treatments, needle aponeurotomy and collagenase injection. We constructed an expected-value decision analysis model with an arm representing each treatment. A survey was administered to a cohort of 50 consecutive subjects to determine utilities of different interventions. We conducted multiple sensitivity analyses to assess the impact of varying the rate of disease recurrence in each arm of the analysis as well as the cost of the collagenase injection. The threshold for a cost-effective treatment is based on the traditional willingness-to-pay of $50,000 per quality-adjusted life years (QALY) gained. The cost of open partial fasciectomy was $820,114 per QALY gained over no treatment. The cost of needle aponeurotomy was $96,474 per QALY gained versus no treatment. When we performed a sensitivity analysis and set the success rate at 100%, the cost of needle aponeurotomy was $49,631. When needle aponeurotomy was performed without surgical center or anesthesia costs and with reduced hand therapy, the cost was $36,570. When a complete collagenase injection series was priced at $250, the cost was $31,856 per QALY gained. When the injection series was priced at $945, the cost was $49,995 per QALY gained. At the market price of $5,400 per injection, the cost was $166,268 per QALY gained. In the current model, open partial fasciectomy is not cost-effective. Needle aponeurotomy is cost-effective if the success rate is high. Collagenase injection is cost-effective when priced under $945. Economic and Decision Analysis II. Copyright © 2011 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.
1990-09-01
following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W
Cost estimators for construction of forest roads in the central Appalachians
Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler
1992-01-01
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...
Green Building Premium Cost Analysis in Indonesia Using Work Breakdown Structure Method
NASA Astrophysics Data System (ADS)
Basten, V.; Latief, Y.; Berawi, M. A.; Riswanto; Muliarto, H.
2018-03-01
The concept of green building in the construction industry is indispensable for mitigating environmental issues such as waste, pollution, and carbon emissions. There are some countries that have Green Building rating tools. Indonesia particularly is the country which has Greenship rating tools but the number of Green Building is relatively low. Development of building construction is depended on building investors or owner initiation, so this research is conducted to get the building aspects that have significant effect on the attractiveness using The Green Building Concept. The method in this research is work breakdown structure method that detailing the green building activities. The particular activities will be processed to get the cost elements for the green building achievement that it was targeted to improve better than conventional building. The final result of the study was a very significant work package on green building construction in the city of Indonesia case study.
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
A cost-benefit analysis of physical activity using bike/pedestrian trails.
Wang, Guijing; Macera, Caroline A; Scudder-Soucie, Barbara; Schmid, Tom; Pratt, Michael; Buchner, David
2005-04-01
From a public health perspective, a cost-benefit analysis of using bike/pedestrian trails in Lincoln, Nebraska, to reduce health care costs associated with inactivity was conducted. Data was obtained from the city's 1998 Recreational Trails Census Report and the literature. Per capita annual cost of using the trails was 209.28 U.S. dollars (59.28 U.S. dollars construction and maintenance, 150 U.S. dollars of equipment and travel). Per capita annual direct medical benefit of using the trails was 564.41 U.S. dollars. The cost-benefit ratio was 2.94, which means that every 1 U.S. dollar investment in trails for physical activity led to 2.94 U.S. dollars in direct medical benefit. The sensitivity analyses indicated the ratios ranged from 1.65 to 13.40. Therefore, building trails is cost beneficial from a public health perspective. The most sensitive parameter affecting the cost-benefit ratios were equipment and travel costs; however, even for the highest cost, every 1 U.S. dollar investment in trails resulted in a greater return in direct medical benefit.
The Three Gorges Project: How sustainable?
NASA Astrophysics Data System (ADS)
Kepa Brian Morgan, Te Kipa; Sardelic, Daniel N.; Waretini, Amaria F.
2012-08-01
SummaryIn 1984 the Government of China approved the decision to construct the Three Gorges Dam Project, the largest project since the Great Wall. The project had many barriers to overcome, and the decision was made at a time when sustainability was a relatively unknown concept. The decision to construct the Three Gorges Project remains contentious today, especially since Deputy Director of the Three Gorges Project Construction Committee, Wang Xiaofeng, stated that "We absolutely cannot relax our guard against ecological and environmental security problems sparked by the Three Gorges Project" (Bristow, 2007; McCabe, 2007). The question therefore was posed: how sustainable is the Three Gorges Project? Conventional approaches to sustainability assessment tend to use monetary based assessment aligned to triple bottom line thinking. That is, projects are evaluated as trade-offs between economic, environmental and social costs and benefits. The question of sustainability is considered using such a traditional Cost-Benefit Analysis approach, as undertaken in 1988 by a CIPM-Yangtze Joint Venture, and the Mauri Model Decision Making Framework (MMDMF). The Mauri Model differs from other approaches in that sustainability performance indicators are considered independently from any particular stakeholder bias. Bias is then introduced subsequently as a sensitivity analysis on the raw results obtained. The MMDMF is unique in that it is based on the Māori concept of Mauri, the binding force between the physical and the spiritual attributes of something, or the capacity to support life in the air, soil, and water. This concept of Mauri is analogous to the Chinese concept of Qi, and there are many analogous concepts in other cultures. It is the universal relevance of Mauri that allows its use to assess sustainability. This research identified that the MMDMF was a strong complement to Cost-Benefit Analysis, which is not designed as a sustainability assessment tool in itself. The MMDMF does have relevance in identifying areas of conflict, and it can support the Cost-Benefit Analysis in assessing sustainability, as a Decision Support Tool. The research concluded that, based on both models, the Three Gorges Project as understood in 1988, and incorporating more recent sustainability analysis is contributing to enhanced sustainability.
Selection criteria for using nighttime construction and maintenance operations : appendices.
DOT National Transportation Integrated Search
2003-05-01
Appendix A: literature review and bibliography of related research; : Appendix B: survey instrument; : Appendix C: survey results; : Appendix D: Oregon crash analysis; : Appendix E: userguide to estimate road user costs; : Appendix F: the study of wo...
Integral abutment bridges under thermal loading : field monitoring and analysis.
DOT National Transportation Integrated Search
2017-08-01
Integral abutment bridges (IABs) have gained popularity throughout the United States due to their low construction and maintenance costs. Previous research on IABs has been heavily focused on substructure performance, leaving a need for better unders...
Research on Risk Manage of Power Construction Project Based on Bayesian Network
NASA Astrophysics Data System (ADS)
Jia, Zhengyuan; Fan, Zhou; Li, Yong
With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.
McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A
2018-01-01
This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives, and should be applied to complex remediation projects to aid environmental decision making. Integr Environ Assess Manag 2018;14:22-31. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
Risk-based planning analysis for a single levee
NASA Astrophysics Data System (ADS)
Hui, Rui; Jachens, Elizabeth; Lund, Jay
2016-04-01
Traditional risk-based analysis for levee planning focuses primarily on overtopping failure. Although many levees fail before overtopping, few planning studies explicitly include intermediate geotechnical failures in flood risk analysis. This study develops a risk-based model for two simplified levee failure modes: overtopping failure and overall intermediate geotechnical failure from through-seepage, determined by the levee cross section represented by levee height and crown width. Overtopping failure is based only on water level and levee height, while through-seepage failure depends on many geotechnical factors as well, mathematically represented here as a function of levee crown width using levee fragility curves developed from professional judgment or analysis. These levee planning decisions are optimized to minimize the annual expected total cost, which sums expected (residual) annual flood damage and annualized construction costs. Applicability of this optimization approach to planning new levees or upgrading existing levees is demonstrated preliminarily for a levee on a small river protecting agricultural land, and a major levee on a large river protecting a more valuable urban area. Optimized results show higher likelihood of intermediate geotechnical failure than overtopping failure. The effects of uncertainty in levee fragility curves, economic damage potential, construction costs, and hydrology (changing climate) are explored. Optimal levee crown width is more sensitive to these uncertainties than height, while the derived general principles and guidelines for risk-based optimal levee planning remain the same.
Age in Relation to Worker Compensation Costs in the Construction Industry
Schwatka, Natalie V.; Butler, Lesley M.; Rosecrance, John C.
2015-01-01
Background A better understanding of how workers’ compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. Methods The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Results Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18–24. Conclusions Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. PMID:22782837
Age in relation to worker compensation costs in the construction industry.
Schwatka, Natalie V; Butler, Lesley M; Rosecrance, John C
2013-03-01
A better understanding of how workers' compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18-24. Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. Copyright © 2012 Wiley Periodicals, Inc.
25 CFR 136.3 - Repayment of construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Repayment of construction costs. 136.3 Section 136.3 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.3 Repayment of construction costs. Under the terms of the contracts, the...
Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].
ERIC Educational Resources Information Center
Geothermal Heat Pump Consortium, Inc., Washington, DC.
A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)
48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...
Proton facility economics: the importance of "simple" treatments.
Johnstone, Peter A S; Kerstiens, John; Richard, Helsper
2012-08-01
Given the cost and debt incurred to build a modern proton facility, impetus exists to minimize treatment of patients with complex setups because of their slower throughput. The aim of this study was to determine how many "simple" cases are necessary given different patient loads simply to recoup construction costs and debt service, without beginning to cover salaries, utilities, beam costs, and so on. Simple cases are ones that can be performed quickly because of an easy setup for the patient or because the patient is to receive treatment to just one or two fields. A "standard" construction cost and debt for 1, 3, and 4 gantry facilities were calculated from public documents of facilities built in the United States, with 100% of the construction funded through standard 15-year financing at 5% interest. Clinical best case (that each room was completely scheduled with patients over a 14-hour workday) was assumed, and a statistical analysis was modeled with debt, case mix, and payer mix moving independently. Treatment times and reimbursement data from the investigators' facility for varying complexities of patients were extrapolated for varying numbers treated daily. Revenue assumptions of $X per treatment were assumed both for pediatric cases (a mix of Medicaid and private payer) and state Medicare simple case rates. Private payer reimbursement averages $1.75X per treatment. The number of simple patients required daily to cover construction and debt service costs was then derived. A single gantry treating only complex or pediatric patients would need to apply 85% of its treatment slots simply to service debt. However, that same room could cover its debt treating 4 hours of simple patients, thus opening more slots for complex and pediatric patients. A 3-gantry facility treating only complex and pediatric cases would not have enough treatment slots to recoup construction and debt service costs at all. For a 4-gantry center, focusing on complex and pediatric cases alone, there would not be enough treatment slots to cover even 60% of debt service. Personnel and recurring costs and profit further reduce the business case for performing more complex patients. Debt is not variable with capacity. Absent philanthropy, financing a modern proton center requires treating a case load emphasizing simple patients even before operating costs and any profit are achieved. Copyright © 2012 American College of Radiology. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
NASA Technical Reports Server (NTRS)
Andrastek, D. A.
1976-01-01
The objectives of this phase of the study were (1) to assess the 10 year operating cost trends of the local service airlines operating in the 1965 through 1974 period, (2) to glean from these trends the technological and operational parameters which were impacted most significantly by the transition to newer pure jet, short haul transports, and effected by changing fuel prices and cost of living indices, and (3) to develop, construct, and evaluate an operating cost forecasting model which would incorporate those factors which best predicted airline total operating cost behavior over that 10-year period.
Costs of Urbanisation in Poland, Based on the Example of Wrocław
NASA Astrophysics Data System (ADS)
Hełdak, Maria; Płuciennik, Monika
2017-10-01
The paper deals with the issue of charging communes with the costs of realisation of the provisions contained in local spatial development plans. When such local spatial development plan enters into force, it leads to economic consequences. In Poland, these consequences are specified in the forecast of the financial impact, which contains a prognosis of own revenues as well as of costs incurred by the budget of the commune. The research consisted in the analysis of the costs of urbanisation of land located in Wrocław, in the southern part of the Krzyki district (Poland). This area is undeveloped to a major extent, consisting mainly of agricultural land, and its development requires the construction of technological and social infrastructure facilities. The expected costs of the realisation of local spatial development plans that are binding for the southern part of Wrocław demonstrate significant costs of the construction of sewage network and municipal roads. The planned development of residential districts is not supported by the existing infrastructure. Additionally, the development of new areas will require the city of Wrocław to take over the real properties on which public goals are planned to be realised. The estimated costs of land acquisition for the realisation of public goals amount to EUR 3 728 500.
Cost-Effectiveness Analysis of Morcellation Hysterectomy for Myomas.
Bortoletto, Pietro; Einerson, Brett D; Miller, Emily S; Milad, Magdy P
2015-01-01
To estimate the cost-effectiveness of eliminating morcellation in the surgical treatment of leiomyomas from a societal perspective. Cost-effectiveness analysis. Not applicable. A theoretical cohort of women undergoing hysterectomy for myoma disease large enough to require morcellation. None. None. A decision analysis model was constructed using probabilities, costs, and utility data from published sources. A cost-effectiveness analysis analyzing both quality-adjusted life years (QALYs) and cases of disseminated cancer was performed to determine the incremental cost-effectiveness ratio (ICER) of eliminating morcellation as a tool in the surgical treatment of leiomyomas. Costs and utilities were discounted using standard methodology. The base case included health care system costs and costs incurred by the patient for surgery-related disability. One-way sensitivity analyses were performed to assess the effect of various assumptions. The cost to prevent 1 case of disseminated cancer was $10 540 832. A strategy of nonmorcellation hysterectomy via laparotomy costed more ($30 359.92 vs $20 853.15) and yielded more QALYs (21.284 vs 21.280) relative to morcellation hysterectomy. The ICER for nonmorcellation hysterectomy compared with morcellation hysterectomy was $2 184 172 per QALY. Health care costs (prolonged hospitalizations) and costs to patients of prolonged time away from work were the primary drivers of cost differential between the 2 strategies. Even when the incidence of occult sarcoma in leiomyoma surgery was ranged to twice that reported in the literature (.98%), the ICER for nonmorcellation hysterectomy was $644 393.30. Eliminating morcellation hysterectomy as a treatment for myomas is not cost-effective under a wide variety of probability and cost assumptions. Performing laparotomy for all patients who might otherwise be candidates for morcellation hysterectomy is a costly policy from a societal perspective. Copyright © 2015 AAGL. Published by Elsevier Inc. All rights reserved.
Space station systems analysis study. Part 3: Documentation. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1977-01-01
The space stations systems analysis study is summarized. A cost efffective system concept capable of meeting a broad spectrum of mission requirements was developed. Candidate objectives were reviewed and implementation requirements were defined. Program options for both low earth and geosynchronous orbits were examined. Space construction concepts were analyzed and defined in detail.
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat
2017-07-01
Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.
Cost analysis of DAWT innovative wind energy systems
NASA Astrophysics Data System (ADS)
Foreman, K. M.
The results of a diffuser augmented wind turbine (DAWT) preliminary design study of three constructional material approaches and cost analysis of DAWT electrical energy generation are presented. Costs are estimated assuming a limited production run (100 to 500 units) of factory-built subassemblies and on-site final assembly and erection within 200 miles of regional production centers. It is concluded that with the DAWT the (busbar) cost of electricity (COE) can range between 2.0 and 3.5 cents/kW-hr for farm and REA cooperative end users, for sites with annual average wind speeds of 16 and 12 mph respectively, and 150 kW rated units. No tax credit incentives are included in these figures. For commercial end users of the same units and site characteristics, the COE ranges between 4.0 and 6.5 cents/kW-hr.
Assessment of economic factors affecting the satellite power system. Volume 1: System cost factors
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1978-01-01
The factors relevant to SPS costing and selection of preferred SPS satellite configurations were studied. The issues discussed are: (1) consideration of economic factors in the SPS system that relate to selection of SPS satellite configuration; (2) analysis of the proper rate of interest for use in SPS system definition studies; and (3) the impacts of differential inflation on SPS system definition costing procedures. A cost-risk comparison of the SPS satellite configurations showed a significant difference in the levelized cost of power from them. It is concluded, that this difference is the result more of differences in the procedures for assessing costs rather than in the satellite technologies required or of any advantages of one satellite configuration over the other. Analysis of the proper rate of interest for use in SPS system is 4 percent. The major item of differential inflation to be expected over this period of time is the real cost of labor. This cost is likely to double between today and the period of SPS construction.
Systems Analysis of Rapid Transit Underground Construction : Volume 2. Sections 6-9 and Appendixes.
DOT National Transportation Integrated Search
1974-12-01
Three San Francisco Bay Area Rapid Transit (BART) projects and two Washington Metropolitan Area Transit Authority (WMATA) projects are analyzed with respect to time schedules, costs, and sensitivity to physical and institutional controls. These data ...
LITERATURE REVIEW OF REMEDIATION METHODS FOR PCBS IN BUILDINGS
This literature review contains a description and analysis of existing methods for management of PCBs in construction materials. Information on the strengths and limitations, efficacy, cost, and byproducts of each remediation method is presented, where available. The report is ba...
Analysis of maintenance costing with emphasis on contracting versus using state forces.
DOT National Transportation Integrated Search
1982-01-01
The authors present the findings of a study to develop a methodology for analyzing decisions of whether to perform ordinary maintenance, maintenance replacement, and incidental construction with state forces or to let them to contract. In developing ...
A statistical analysis of the relationship between land values and freestanding bus facilities.
DOT National Transportation Integrated Search
2010-02-01
Public transit professionals continue to seek methods that offer greater service opportunities, while : not materially increasing the costs of service provision. One strategy is to construct bus transit : centers which operate much like the airline h...
Nieves, Diana; Puig-Peiró, Ruth; Ferrándiz, Carlos; Plazas, Maria Josep; Brosa, Max
2015-06-01
The aim of this study is to conduct a cost-effectiveness analysis of 5-fluorouracil 0.5%/salicylic acid 10% (5-FU/SA) in the treatment of isolated hyperkeratotic actinic keratosis lesions in Spain. An analytical decision-making model was constructed to compare whether 5-FU/SA was a cost-effective option compared with cryotherapy from the perspective of the Spanish National Health System with a time horizon of 6 months. Costs were expressed in 2014 euros. The cost of patients with hyperkeratotic actinic keratosis treated with 5-FU/SA or cryotherapy was €266 and €285, respectively. 5-FU/SA was associated with higher rates of treatment success and, consequently, more quality-adjusted life years, than cryotherapy. Therefore, 5-FU/SA was the dominant treatment, as it was associated with a lower treatment cost and greater effectiveness than cryotherapy. Economically, 5-FU/SA was a dominant option compared with cryotherapy in the treatment of isolated hyperkeratotic actinic keratosis lesions in Spain.
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
Specifications for the First CSP Building System.
ERIC Educational Resources Information Center
Detroit Public Schools, MI.
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
Analysis of strategies to increase external fixator stiffness: is double stacking worth the cost?
Strebe, Sara; Kim, Hyunchul; Russell, Joseph P; Hsieh, Adam H; Nascone, Jason; O'Toole, Robert V
2014-07-01
We compared the mechanical benefits and costs of 3 strategies that are commonly used to increase knee-spanning external fixator stiffness (resistance to deformation): double stacking, cross-linking, and use of an oblique pin. At our academic trauma centre and biomechanical testing laboratory, we used ultra-high-molecular-weight polyethylene bone models and commercially available external fixator components to simulate knee-spanning external fixation. The models were tested in anterior-posterior bending, medial-lateral bending, axial compression, and torsion. We recorded the construct stiffness for each strategy in all loading modes and assessed a secondary outcome of cost per 10% increase in stiffness. Double stacking significantly increased construct stiffness under anterior-posterior bending (109%), medial-lateral bending (22%), axial compression (150%), and torsion (41%) (p<0.05). Use of an oblique pin significantly increased stiffness under torsion (25%) (p<0.006). Cross-linking significantly increased stiffness only under torsion (29%) (p<0.002). Double stacking increased costs by 84%, cross-linking by 28%, and use of an oblique pin by 15% relative to a standard fixator. All 3 strategies increased stiffness under torsion to varying degrees, but only double stacking increased stiffness in all 4 testing modalities (p<0.05). Double stacking is most effective in increasing resistance to bending, particularly under anterior-posterior bending and axial compression, but requires a relatively high cost increase. Clinicians can use these data to help guide the most cost-effective strategy to increase construct stiffness based on the plane in which stiffness is needed. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-06-01
The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 1 is divided into the following sections: (1) Introduction; (2) Summary and Conclusions; (3) Design Basis; (4) Site Evaluation; (5) LNG Terminal Design; (6) Major Equipment and Instrumentation; (7) Marine Operations; (8) Safety Considerations; (9) Environmental Review; (10) Preliminary Project Execution Strategy; (11) Cost Estimates; (12) Project Master Schedule; (13) Economic Analysis; (14)more » Financing; (15) Future Work.« less
Building Structure Housing: Case Study of Community Housing in Kendari City
NASA Astrophysics Data System (ADS)
Umar, M. Z.; Faslih, A.; Arsyad, M.; Sjamsu, A. S.; Kadir, I.
2017-11-01
Housing development has been pioneered through a simple home construction program to reduce the production cost. Simple housing program was developed in Kendari City. The purpose of this study is to show the principles of reducing the cost production for the type 36 homes, in Kendari City. The selected architectural objects are the lower, middle and the upper structure of type 36 house. The data collection was done by observation and in-depth discussion with construction workers. The analysis technique used in this research was a descriptive narrative analysis technique in the form of tabulation data. This study concluded that there are several principles of price reduction in the structure of public housing buildings. Quick principles exist in constructing techniques such as using cigarette packs as a foundation pad, mortar usage for rapid wall standing, and the spacing of mortars could be done manually by using two fingers on a human hand. Economic principles could be used for material matters, such as eliminating the use of gravel for concrete, the use of sand material to contain the soil, the foundation does not use sand and empty stone, and the shape of the ring beam was made using triangle reinforcement.
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
PHENIX Work Breakdown Structure. Cost and schedule review copy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
van Boven, Job Fm; Tommelein, Eline; Boussery, Koen; Mehuys, Els; Vegter, Stefan; Brusselle, Guy Go; Rutten-van Mölken, Maureen Pmh; Postma, Maarten J
2014-06-14
The PHARMACOP-intervention significantly improved medication adherence and inhalation technique for patients with COPD compared with usual care. This study aimed to evaluate its cost-effectiveness. An economic analysis was performed from the Belgian healthcare payer's perspective. A Markov model was constructed in which a representative group of patients with COPD (mean age of 70 years, 66% male, 43% current smokers and mean Forced Expiratory Volume in 1 second of % predicted of 50), was followed for either receiving the 3-month PHARMACOP-intervention or usual care. Three types of costs were calculated: intervention costs, medication costs and exacerbation costs. Outcome measures included the number of hospital-treated exacerbations, cost per prevented hospital-treated exacerbation and cost per Quality Adjusted Life-Year. Follow-up was 1 year in the basecase analysis. Sensitivity and scenario analyses (including long-term follow-up) were performed to assess uncertainty. In the basecase analysis, the average overall costs per patient for the PHARMACOP-intervention and usual care were €2,221 and €2,448, respectively within the 1-year time horizon. This reflects cost savings of €227 for the PHARMACOP-intervention. The PHARMACOP-intervention resulted in the prevention of 0.07 hospital-treated exacerbations per patient (0.177 for PHARMACOP versus 0.244 for usual care). Results showed robust cost-savings in various sensitivity analyses. Optimization of current pharmacotherapy (e.g. close monitoring of inhalation technique and medication adherence) has been shown to be cost-saving and should be considered before adding new therapies.
2014-01-01
Background The PHARMACOP-intervention significantly improved medication adherence and inhalation technique for patients with COPD compared with usual care. This study aimed to evaluate its cost-effectiveness. Methods An economic analysis was performed from the Belgian healthcare payer’s perspective. A Markov model was constructed in which a representative group of patients with COPD (mean age of 70 years, 66% male, 43% current smokers and mean Forced Expiratory Volume in 1 second of % predicted of 50), was followed for either receiving the 3-month PHARMACOP-intervention or usual care. Three types of costs were calculated: intervention costs, medication costs and exacerbation costs. Outcome measures included the number of hospital-treated exacerbations, cost per prevented hospital-treated exacerbation and cost per Quality Adjusted Life-Year. Follow-up was 1 year in the basecase analysis. Sensitivity and scenario analyses (including long-term follow-up) were performed to assess uncertainty. Results In the basecase analysis, the average overall costs per patient for the PHARMACOP-intervention and usual care were €2,221 and €2,448, respectively within the 1-year time horizon. This reflects cost savings of €227 for the PHARMACOP-intervention. The PHARMACOP-intervention resulted in the prevention of 0.07 hospital-treated exacerbations per patient (0.177 for PHARMACOP versus 0.244 for usual care). Results showed robust cost-savings in various sensitivity analyses. Conclusions Optimization of current pharmacotherapy (e.g. close monitoring of inhalation technique and medication adherence) has been shown to be cost-saving and should be considered before adding new therapies. PMID:24929799
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gossen, C.L.
1996-10-01
More than 90% of the new single-family dwellings built in the Phoenix Metropolitan Area consists of wood frame construction. Using adobe and rammed earth as alternatives in residential wall construction are the main focus of this study. The study examines the process of home construction, concentrating on the environmental impacts of energy embodied in the four stages: extraction, transportation, construction, and operation. These four stages were applied to three prototypes built in the Phoenix Area throughout one year. The results are compared to determine which has the lowest environmental costs and most likely to benefit sustainability. The study requires amore » comparative analysis rather than a definite choice of a better prototype. The information provides assistance to the builder/designer with options about environmental impacts and the whole energy spectrum. Wherein previous research was based on performance standards of operation, one must also consider environmental impacts and externalities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feldman, D.; Friedman, B.; Margolis, R.
Previous work quantifying the non-hardware balance-of-system costs -- or soft costs -- associated with building a residential or commercial photovoltaic (PV) system has left a significant portion unsegmented in an 'other soft costs' category. This report attempts to better quantify the 'other soft costs' by focusing on the financing, overhead, and profit of residential and commercial PV installations for a specific business model. This report presents results from a bottom-up data-collection and analysis of the upfront costs associated with developing, constructing, and arranging third-party-financed residential and commercial PV systems. It quantifies the indirect corporate costs required to install distributed PVmore » systems as well as the transactional costs associated with arranging third-party financing.« less
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
HVAC Design Strategy for a Hot-Humid Production Builder, Houston, Texas (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.
Evaluation of ways and procedures to reduce construction cost and increase competition.
DOT National Transportation Integrated Search
2009-01-01
Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...
Analysis, annotation, and profiling of the oat seed transcriptome
USDA-ARS?s Scientific Manuscript database
Novel high-throughput next generation sequencing (NGS) technologies are providing opportunities to explore genomes and transcriptomes in a cost-effective manner. To construct a gene expression atlas of developing oat (Avena sativa) seeds, two software packages specifically designed for RNA-seq (Trin...
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Consideration of using alternative, renewable energy sources. Major building modification means modification of... AIRPORT AID PROGRAM Energy Conservation in Airport Aid Program § 152.605 Definitions. As used in this... the program, which will exceed $200,000 in construction cost. Energy assessment means an analysis of...
Shi, Guo; Zhang, Shun-xiang
2013-03-01
To synthesize relevant data and to analyze the benefit-cost ratio on strategies related to preventing the maternal-infantile transmission of hepatitis B virus infection and to explore the optimal strategy. A decision tree model was constructed according to the strategies of hepatitis B immunization and a Markov model was conducted to simulate the complex disease progress after HBV infection. Parameters in the models were drawn from meta-analysis and information was collected from field study and review of literature. Economic evaluation was performed to calculate costs, benefit, and the benefit-cost ratio. Sensitivity analysis was also conducted and a tornado graph was drawn. In view of the current six possible strategies in preventing maternal-infantile transmission of hepatitis B virus infection, a multi-stage decision tree model was constructed to screen hepatitis B surface antigen (HBsAg) or screen for HBsAg then hepatitis B e antigen (HBeAg). Dose and the number of injections of HBIG and hepatitis B vaccine were taken into consideration in the model. All the strategies were considered to be cost-saving, while the strategy of screening for HBsAg and then offering hepatitis B vaccine of 10 µg×3 for all neonates with hepatitis B immunoglobulin (HBIG) of 100 IU×1 for the neonates born to mothers who tested positive for HBsAg appeared with most cost-saving. In the strategies, the benefit-cost ratio of using 100 IU HBIG was similar to 200 IU HBIG, and one shot of HBIG was superior to two shots. from sensitivity analysis suggested that the rates of immunization and the efficacy of the strategy in preventing maternal-infantile transmission were the main sensitive variables in the model. The passive-active immune-prophylaxis strategy that using 10 µg hepatitis B vaccine combined with 100 IU HBIG seemed to be the optimal strategy in preventing maternal-infantile transmission, while the rates of immunization and the efficacy of the strategy played the key roles in choosing the ideal strategy.
Wright, Jonathan L; Wessells, Hunter; Nathens, Avery B; Hollingworth, Will
2006-05-01
Direct vision internal urethrotomy (DVIU) and urethroplasty are the primary methods of managing urethral stricture disease. Using decision analysis, we determine the cost-effectiveness of different management strategies for short, bulbar urethral strictures 1 to 2 cm in length. A decision tree was constructed, with the number of planned possible DVIUs before attempting urethroplasty defined for each primary branch point. Success rates were obtained from published reports. Costs were estimated from a societal perspective and included the costs of the procedures and office visits and lost wages from convalescence. Sensitivity analyses were conducted, varying the success rates of the procedures and cost estimates. The most cost-effective approach was one DVIU before urethroplasty. The incremental cost of performing a second DVIU before attempting urethroplasty was $141,962 for each additional successfully voiding patient. In the sensitivity analysis, urethroplasty as the primary therapy was cost-effective only when the expected success rate of the first DVIU was less than 35%. The most cost-effective strategy for the management of short, bulbar urethral strictures is to reserve urethroplasty for patients in whom a single endoscopic attempt fails. For longer strictures for which the success rate of DVIU is expected to be less than 35%, urethroplasty as primary therapy is cost-effective. Future prospective, multicenter studies of DVIU and urethroplasty outcomes would help enhance the accuracy of our model.
House Construction: How To Reduce Costs
Jerry O. Newman; Norman C. Teter; Constance D. O' Brien
1969-01-01
You're building a house and want to keep down the cost. How can you do it? First, plan carefully "on paper" before you start construction. By doing so, you can avoid costly mistakesinthebuildingandinthe purchase of materials. Careful planning and proper design will reduce not only the initial cost but also the cost of furnishings, utilities, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
Accessible cell phone design: development and application of a needs analysis framework.
Smith-Jackson, Tonya; Nussbaum, Maury; Mooney, Aaron
2003-05-20
This research describes the development and use of the Needs Analysis and Requirements Acquisition (NARA) framework to elicit and construct user requirements for the design of cell phones (which are a type of assistive technology) that are both usable and accessible to persons with disabilities. Semi-structured interviews and a focus group were used to elicit information and a systematic approach was used to translation information into requirements (construct). Elicitation and construction are the first two stages of NARA. Requirements for general and feature-specific phone attributes were identified, and several requirements were found to match six of the seven universal design principles. The study demonstrated that NARA is both a straight-forward and cost-effective method to develop user requirements and can be used throughout the development cycle.
24 CFR 578.47 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true New construction. 578.47 Section 578... construction. (a) Use. Grant funds may be used to: (1) Pay up to 100 percent of the cost of new construction... the floor area by 100 percent or more, and the cost of land associated with that construction, for use...
The prediction of engineering cost for green buildings based on information entropy
NASA Astrophysics Data System (ADS)
Liang, Guoqiang; Huang, Jinglian
2018-03-01
Green building is the developing trend in the world building industry. Additionally, construction costs are an essential consideration in building constructions. Therefore, it is necessary to investigate the problems of cost prediction in green building. On the basis of analyzing the cost of green building, this paper proposes the forecasting method of actual cost in green building based on information entropy and provides the forecasting working procedure. Using the probability density obtained from statistical data, such as labor costs, material costs, machinery costs, administration costs, profits, risk costs a unit project quotation and etc., situations can be predicted which lead to cost variations between budgeted cost and actual cost in constructions, through estimating the information entropy of budgeted cost and actual cost. The research results of this article have a practical significance in cost control of green building. Additionally, the method proposed in this article can be generalized and applied to a variety of other aspects in building management.
50 CFR 253.11 - Guarantee policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...
Categorization of potential project cost overrun factors in construction industry
NASA Astrophysics Data System (ADS)
Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.
2018-04-01
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
[A cost-benefit analysis of occupational disease reporting in China].
Tang, X Z; Zeng, Q; Liu, D S
2017-03-20
Objective: To perform a cost-benefit analysis of the occupational disease reporting system in China, and to provide a basis for effective resource allocation. Methods: The data on the cost of occupational diseases were collected from China Health Statistics Yearbook 2013, the estimated benefit data were collected from published articles in China and foreign countries, and the probability data were collected from the occupational diseasereports published by health and family planning administrative departments. Adecision-making tree was used for the cost-benefit analysis. Results: The estimated cost of occupational disease reporting was about 102.47 million yuan/year, consisting of a cost of reporting in national medical institutions of 1.25 million yuan/year, a management cost of 30.35 million yuan/year, a management cost in local public health institutions of 69.80 million yuan/year, a management cost in national public health institutions of 370 thousand yuan/year, and a cost of construction and maintenance of reporting system of 700 thousand yuan/year. The results of the decision tree analysis showed that when an occupational disease monitoring system was established, the incremental input for occupational disease monitoring and prevention/control was 2.1 billion yuan/year, the output was 6.5 billion yuan/year, and the benefit of occupational disease reporting system was 4.4 billion yuan/year. Conclusion: The benefit of occupational disease reporting system depends on the cost-benefit of occupational disease prevention and control measures, and proper prevention and control measures are extremely important for improving the benefit of occupational disease reporting system.
ERIC Educational Resources Information Center
Chiarini, Marc A.
2010-01-01
Traditional methods for system performance analysis have long relied on a mix of queuing theory, detailed system knowledge, intuition, and trial-and-error. These approaches often require construction of incomplete gray-box models that can be costly to build and difficult to scale or generalize. In this thesis, we present a black-box analysis…
NASA Astrophysics Data System (ADS)
na ayudhaya, Paisarn Daungjak; Klinbumrung, Arrak; Jaroensutasinee, Krisanadej; Pratontep, Sirapat; Kerdcharoen, Teerakiat
2009-05-01
In case of species of natural and aromatic plant originated from the northern Thailand, sensory characteristics, especially odours, have unique identifiers of herbs. The instruments sensory analysis have performed by several of differential of sensing, so call `electronic nose', to be a significantly and rapidly for chemometrics. The signal responses of the low cost electronic nose were evaluated by principal component analysis (PCA). The aims of this paper evaluated various of Thai-herbs grown in Northern of Thailand as data preprocessing tools of the Low-cost electronic nose (enNU-PYO1). The essential oil groups of Thai herbs such as Garlic, Lemongrass, Shallot (potato onion), Onion, Zanthoxylum limonella (Dennst.) Alston (Thai name is Makaen), and Kaffir lime leaf were compared volatilized from selected fresh herbs. Principal component analysis of the original sensor responses did clearly distinguish either all samples. In all cases more than 97% for cross-validated group were classified correctly. The results demonstrated that it was possible to develop in a model to construct a low-cost electronic nose to provide measurement of odoriferous herbs.
Cost-Utility Analysis of Lurasidone Versus Aripiprazole in Adults with Schizophrenia.
Rajagopalan, Krithika; Trueman, David; Crowe, Lydia; Squirrell, Daniel; Loebel, Antony
2016-07-01
In 2014, lurasidone, an atypical antipsychotic, was approved for the treatment of schizophrenia in adults. It is an alternative treatment option to aripiprazole, and when compared with aripiprazole, lurasidone was associated with improved symptom reduction and reduced risk of weight gain and relapse. We conducted a cost-utility analysis of lurasidone versus aripiprazole from the perspective of healthcare services, using Scotland and Wales as specific case studies. A 10-year Markov model, incorporating a 6-week acute phase and a maintenance phase across three health states (discontinuation, relapse, death) was constructed. Six-week probabilities of discontinuation and adverse events were based on a published independent mixed-treatment comparison; long-term risks of relapse and discontinuation were from an indirect comparison. Costs included drug therapy, relapse, and outpatient, primary and residential care. Costs and benefits were discounted at 3.5 %. Utility estimates were taken from published literature, and cost effectiveness was expressed as total 10-year incremental costs and quality-adjusted life-years (QALYs). Lurasidone yielded a cost saving of £3383 and an improvement of 0.005 QALYs versus aripiprazole, in Scotland. Deterministic sensitivity analysis demonstrated that results were sensitive to relapse rates, while probabilistic sensitivity analysis suggested that lurasidone had the highest expected net benefit at willingness-to-pay thresholds of £20,000-30,000 per QALY. The probability that lurasidone was a cost-effective treatment strategy was approximately 75 % at all willingness-to-pay thresholds, with similar results being obtained for the Welsh analysis. Our analysis suggests that lurasidone would provide an effective, cost-saving alternative for the healthcare service in the treatment of adult patients with schizophrenia.
Energy utilization: municipal waste incineration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaBeck, M.F.
An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less
Theologis, Alexander A; Miller, Liane; Callahan, Matt; Lau, Darryl; Zygourakis, Corinna; Scheer, Justin K; Burch, Shane; Pekmezci, Murat; Chou, Dean; Tay, Bobby; Mummaneni, Praveen; Berven, Sigurd; Deviren, Vedat; Ames, Christopher P
2016-08-15
Retrospective cohort analysis. To evaluate the economic impact of revision surgery for proximal junctional failures (PJF) after thoracolumbar fusions for adult spinal deformity (ASD). PJF after fusions for ASD is a major cause of disability. Although clinical sequelae are described, PJF-revision operation costs are incompletely defined. Consecutive adults who underwent thoracolumbar fusions for ASD (August, 2003 to January, 2013) were evaluated. Inclusion criteria include construct from pelvis to L2 or above and minimum 6 months follow-up after the index ASD operation. Direct costs (surgical supplies/implants, room/care, pharmacy, services) were identified from medical billing data and calculated for index ASD operations and subsequent surgeries for PJF. Not included in direct cost data were indirect costs, charges, surgeon fees, or revision operations for indications other than PJF (i.e., pseudarthrosis). Patients were compared based on the construct's upper-instrumented vertebra: upper thoracic (UT: T1-6) versus thoracolumbar junction (TLjxn: T9-L2). Of 501 patients, 382 met inclusion criteria. Fifty-one patients [UT:14; TLjxn: 40 at index; average follow-up 32.6 months (6-92 months)] had revisions for PJF, which summed to $3.2 million total direct cost. Average direct cost of index operations for the cohort ($68,294) was significantly greater than PJF-revisions ($55,547). Compared with TLjxn, UT had a significantly higher average cost for index operations ($79,860 vs. $65,868). However, PJF-revision cases were similar in average cost (UT:$60,103; TLjxn:$53,920; P = 0.09). Costs of PJF amounted to an additional 12.1% of the total index surgical cost in 382 patients. Revision operations for PJF after long thoracolumbar fusions for ASD are associated with an average direct cost of $55,547 per case. Revision costs for PJF are similar based on the index procedure's upper-instrumented vertebra level. At a major tertiary center over a 10-year period, PJF came at a very significant economic expense amounting to $3.2 million for 57 cases. 3.
A Cost Savings Analysis of the Streamlined Military Construction Program Process
1990-04-16
program through Congressional action . Review of these two years allowed the biennial budget to be addressed from the perspective of the first year of...specifications in outline form. c. Preliminar- project design cost estimates.. d. Back-up daca as required by this Appendix. 2. The 35 percent preliminary...delayed Congressional action . A pragmatic estimate would add an additional 12-36 months to the optimistic total. How can it possibly take that long? In
NASA Astrophysics Data System (ADS)
Cretcher, C. K.
1980-11-01
The impact of stringent energy conserving building standards on electric utility service areas and their customers was analyzed. The demands on the seven broadly representative electric utilities were aggregated to represent the total new construction electric heating demands in the years 1990 and 2000 to be compared to the aggregate obtained similarly for a nominal, less stringent standard, viz., ASHRAE 90-75. Results presented include the percentage of energy savings achieved in both heating and cooling seasons and typical demand profile changes. A utility economic impact analysis was performed for the cases investigated to determine changes in operating costs and potential capacity sales. A third cost component considered is the incremental cost of superinsulation (over ASHRAE 90-75) to the customer. The aggregate net cost to the utility/customer entity is utilized as a measure of overall economic benefit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... determines, based on the analysis in § 404.38(a), that an Indian tribe is not capable of paying at least 25 percent of the construction costs, Reclamation may recommend in its feasibility report that the collection...
Solar power satellite system definition study. Volume 5, phase 1: Executive summary
NASA Technical Reports Server (NTRS)
1979-01-01
An analysis of the solar power satellite system is presented. Performance, cost, and operational characteristics are assessed. The photovoltaic system is described and investigated. Alternative construction concepts are discussed. The structural bay configuration is presented along with the antenna structure options.
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
Use Of Thermography In The Diagnostics Of Energy Use In Multifamily Dwellings.
NASA Astrophysics Data System (ADS)
Gadsby, Kenneth J.; Harrje, David T.
1984-03-01
Rising energy costs have placed a heavy burden on multifamily complex managers in recent years. To reduce energy expenditures these managers are then faced with making difficult decisions as to which building retrofits will prove to be most cost-effective. The Building Energy Research Group at Princeton University has embarked on the development of analysis procedures that will provide these managers with a prioritized list of energy conservation opportunities (ECOs). The case studies presented here illustrate the importance of thermography in this analysis procedure, its impact on the inspection time, and the value of the information gained. The infrared scan often eliminates large areas of the thermal envelope from further inspection and aids the analyst in locating energy losses through construction that would otherwise be difficult to find. Not only does thermography guide us in the choice of ECOs but it also provides us with information that should lead to the construction of better buildings in the future.
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
Luhmann, Scott J; McAughey, Eoin M; Ackerman, Stacey J; Bumpass, David B; McCarthy, Richard E
2018-01-01
Treating early-onset scoliosis (EOS) with traditional growing rods (TGR) is effective but requires periodic surgical lengthening, risking complications. Alternatives include magnetically controlled growing rods (MCGR) that lengthen noninvasively and the growth guidance system (GGS), which obviate the need for active, distractive lengthenings. Previous studies have reported promising clinical effectiveness for GGS; however the direct medical costs of GGS compared to TGR and MCGR have not yet been explored. To estimate the cost of GGS compared with MCGR and TGR for EOS an economic model was developed from the perspective of a US integrated health care delivery system. Using dual-rod constructs, the model estimated the cumulative costs associated with initial implantation, rod lengthenings (TGR, MCGR), revisions due to device failure, surgical-site infections, device exchange, and final spinal fusion over a 6-year episode of care. Model parameters were from peer-reviewed, published literature. Medicare payments were used as a proxy for provider costs. Costs (2016 US$) were discounted 3% annually. Over a 6-year episode of care, GGS was associated with fewer invasive surgeries per patient than TGR (GGS: 3.4; TGR: 14.4) and lower cumulative costs than MCGR and TGR, saving $25,226 vs TGR. Sensitivity analyses showed that results were sensitive to changes in construct costs, rod breakage rates, months between lengthenings, and TGR lengthening setting of care. Within the model, GGS resulted in fewer invasive surgeries and deep surgical site infections than TGR, and lower cumulative costs per patient than both MCGR and TGR, over a 6-year episode of care. The analysis did not account for family disruption, pain, psychological distress, or compromised health-related quality of life associated with invasive TGR lengthenings, nor for potential patient anxiety surrounding the frequent MCGR lengthenings. Further analyses focusing strictly on current generation technologies should be considered for future research.
Luhmann, Scott J; McAughey, Eoin M; Ackerman, Stacey J; Bumpass, David B; McCarthy, Richard E
2018-01-01
Purpose Treating early-onset scoliosis (EOS) with traditional growing rods (TGR) is effective but requires periodic surgical lengthening, risking complications. Alternatives include magnetically controlled growing rods (MCGR) that lengthen noninvasively and the growth guidance system (GGS), which obviate the need for active, distractive lengthenings. Previous studies have reported promising clinical effectiveness for GGS; however the direct medical costs of GGS compared to TGR and MCGR have not yet been explored. Methods To estimate the cost of GGS compared with MCGR and TGR for EOS an economic model was developed from the perspective of a US integrated health care delivery system. Using dual-rod constructs, the model estimated the cumulative costs associated with initial implantation, rod lengthenings (TGR, MCGR), revisions due to device failure, surgical-site infections, device exchange, and final spinal fusion over a 6-year episode of care. Model parameters were from peer-reviewed, published literature. Medicare payments were used as a proxy for provider costs. Costs (2016 US$) were discounted 3% annually. Results Over a 6-year episode of care, GGS was associated with fewer invasive surgeries per patient than TGR (GGS: 3.4; TGR: 14.4) and lower cumulative costs than MCGR and TGR, saving $25,226 vs TGR. Sensitivity analyses showed that results were sensitive to changes in construct costs, rod breakage rates, months between lengthenings, and TGR lengthening setting of care. Conclusion Within the model, GGS resulted in fewer invasive surgeries and deep surgical site infections than TGR, and lower cumulative costs per patient than both MCGR and TGR, over a 6-year episode of care. The analysis did not account for family disruption, pain, psychological distress, or compromised health-related quality of life associated with invasive TGR lengthenings, nor for potential patient anxiety surrounding the frequent MCGR lengthenings. Further analyses focusing strictly on current generation technologies should be considered for future research. PMID:29588607
Principles of cost-effective resource allocation in health care organizations.
Weinstein, M C
1990-01-01
Cost-effectiveness analysis (CEA) is a method of economic evaluation that can be used to assess the efficiency with which health care technologies use limited resources to produce health outputs. However, inconsistencies in the way that such ratios are constructed often lead to misleading conclusions when CEAs are compared. Some of these inconsistencies, such as failure to discount or to calculate incremental ratios correctly, reflect analytical errors that, if corrected, would resolve the inconsistencies. Others reflect fundamental differences in the viewpoint of the analysis. The perspectives of different decision-making entities can properly lead to different items in the numerator and denominator of the cost-effectiveness (C/E) ratio. Producers and consumers of CEA need to be more conscious of the perspectives of analysis, so that C/E comparisons from a given perspective are based upon a common understanding of the elements that are properly included.
Structural analysis of an off-grid tiny house
NASA Astrophysics Data System (ADS)
Calluari, Karina Arias; Alonso-Marroquín, Fernando
2017-06-01
The off-grid technologies and tiny house movement have experimented an unprecedented growth in recent years. Putting both sides together, we are trying to achieve an economic and environmental friendly solution to the higher cost of residential properties. This solution is the construction of off-grid tiny houses. This article presents a design for a small modular off-grid house made by pine timber. A numerical analysis of the proposed tiny house was performed to ensure its structural stability. The results were compared with the suggested serviceability limit state criteria, which are contended in the Australia Guidelines Standards making this design reliable for construction.
Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.
48 CFR 236.271 - Cost-plus-fixed-fee contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...
23 CFR 635.205 - Finding of cost effectiveness.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Finding of cost effectiveness. 635.205 Section 635.205... CONSTRUCTION AND MAINTENANCE Force Account Construction § 635.205 Finding of cost effectiveness. (a) It may be found cost effective for a State transportation department or county to undertake a federally financed...
Fabrication and performance analysis of a low cost parabolic type solar cooker
NASA Astrophysics Data System (ADS)
Akter, Farhana Nasrin; Islam, Muhammed Kamrul; Begum, Nurun Nahar
2017-06-01
Developing countries depend mostly on natural fuel sources such as wood fuel, fossil fuel (kerosene and liquid petroleum gas) etc. for cooking purpose. However, these are expensive and also lead to the threads like deforestation as well as environmental degradation. An alternative renewable energy source like solar energy can contribute a solution towards the adverse crisis of fuel consumption along with environmental pollution of developing countries. Therefore, this study aims to design and fabricate a cost effective solar cooker for domestic purposes as well as performance analysis in order to evaluate its effectiveness. The cooker has been made of cardboard, tin, aluminum foil (polished and non-polished) and glass. Simple construction with reflectors surrounded by tin was fabricated with 1000ml load of water in the cooker hanging by a stand and observed that the best comparative performance in areas with longest durations of clear sky greatest direct ray falling on the collector cookers under moderate cloudy conditions. By applying better techniques for construction of solar cooker with low maintenance through testing and graphing the result, increasing of temperature with minimum cost for cooking purpose was outcome with portable cooker. In this analysis, analytical and experimental values varied due to fickle weather, however, maximum temperature variation was found 36 degree Celsius with efficiency 8.8% in the cooker made of aluminum foil (non-polished).
Factors affecting construction performance: exploratory factor analysis
NASA Astrophysics Data System (ADS)
Soewin, E.; Chinda, T.
2018-04-01
The present work attempts to develop a multidimensional performance evaluation framework for a construction company by considering all relevant measures of performance. Based on the previous studies, this study hypothesizes nine key factors, with a total of 57 associated items. The hypothesized factors, with their associated items, are then used to develop questionnaire survey to gather data. The exploratory factor analysis (EFA) was applied to the collected data which gave rise 10 factors with 57 items affecting construction performance. The findings further reveal that the items constituting ten key performance factors (KPIs) namely; 1) Time, 2) Cost, 3) Quality, 4) Safety & Health, 5) Internal Stakeholder, 6) External Stakeholder, 7) Client Satisfaction, 8) Financial Performance, 9) Environment, and 10) Information, Technology & Innovation. The analysis helps to develop multi-dimensional performance evaluation framework for an effective measurement of the construction performance. The 10 key performance factors can be broadly categorized into economic aspect, social aspect, environmental aspect, and technology aspects. It is important to understand a multi-dimension performance evaluation framework by including all key factors affecting the construction performance of a company, so that the management level can effectively plan to implement an effective performance development plan to match with the mission and vision of the company.
Marsden, G; Perry, M; Bradbury, A; Hickey, N; Kelley, K; Trender, H; Wonderling, D; Davies, A H
2015-12-01
The aim was to investigate the cost-effectiveness of interventional treatment for varicose veins (VV) in the UK NHS, and to inform the national clinical guideline on VV, published by the National Institute of Health and Care Excellence. An economic analysis was constructed to compare the cost-effectiveness of surgery, endothermal ablation (ETA), ultrasound-guided foam sclerotherapy (UGFS), and compression stockings (CS). The analysis was based on a Markov decision model, which was developed in consultation with members of the NICE guideline development group (GDG). The model had a 5-year time horizon, and took the perspective of the UK National Health Service. Clinical inputs were based on a network meta-analysis (NMA), informed by a systematic review of the clinical literature. Outcomes were expressed as costs and quality-adjusted life years (QALYs). All interventional treatments were found to be cost-effective compared with CS at a cost-effectiveness threshold of £20,000 per QALY gained. ETA was found to be the most cost-effective strategy overall, with an incremental cost-effectiveness ratio of £3,161 per QALY gained compared with UGFS. Surgery and CS were dominated by ETA. Interventional treatment for VV is cost-effective in the UK NHS. Specifically, based on current data, ETA is the most cost-effective treatment in people for whom it is suitable. The results of this research were used to inform recommendations within the NICE guideline on VV. Copyright © 2015 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.
California-Wyoming Grid Integration Study: Phase 1 -- Economic Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corbus, D.; Hurlbut, D.; Schwabe, P.
This study presents a comparative analysis of two different renewable energy options for the California energy market between 2017 and 2020: 12,000 GWh per year from new California in-state renewable energy resources; and 12,000 GWh per year from Wyoming wind delivered to the California marketplace. Either option would add to the California resources already existing or under construction, theoretically providing the last measure of power needed to meet (or to slightly exceed) the state's 33% renewable portfolio standard. Both options have discretely measurable differences in transmission costs, capital costs (due to the enabling of different generation portfolios), capacity values, andmore » production costs. The purpose of this study is to compare and contrast the two different options to provide additional insight for future planning.« less
Wilburn, David R.; Goonan, Thomas G.
1998-01-01
Increased amounts of recycled materials are being used to supplement natural aggregates (derived from crushed stone, sand and gravel) in road construction. An understanding of the economics and factors affecting the level of aggregates recycling is useful in estimating the potential for recycling and in assessing the total supply picture of aggregates. This investigation includes a descriptive analysis of the supply sources, technology, costs, incentives, deterrents, and market relationships associated with the production of aggregates.
Clinical and health care aspects of respiratory tract disorders in Poland.
Kanecki, Krzysztof; Zycinska, Katarzyna; Tyszko, Piotr
2016-01-01
Respiratory diseases constitute a public health priority worldwide. This is related to the increasing exposure to microorganisms, toxic factors, allergens, drugs and smoking, as the most important factors. Increasing costs of health promotion, prevention, diagnosis and treatment of respiratory tract diseases forces the search for effective strategies in the reduction of costs without making a significant impact of these activities on health results. Chronic obstructive pulmonary disease (COPD) is an example of these diseases with increasing incidence, which has few known modifiable factors and absorbs large medical and social costs. The aim of this study is to present the conception of cost driver analysis that could be useful in constructing a good combination of the EBM-based treatment with cost reduction decisions. Analysis of cost drivers was based on the Global Initiative for Chronic Obstructive Lung Disease (GOLD) guidelines and Polish recommendations of COPD diagnosis and treatment. The proposition of cost reduction strategy in COPD treatment was based on identification of cost drivers in value chain conception. An increasing incidence and treatment costs of COPD force the search for methods of costs reduction in health care. Identifying, evaluating and modifying the cost drivers with use of the value chain conception could be an effective method in achieving these objectives.
3D-FEM Analysis on Geogrid Reinforced Flexible Pavement Roads
NASA Astrophysics Data System (ADS)
Calvarano, Lidia Sarah; Palamara, Rocco; Leonardi, Giovanni; Moraci, Nicola
2017-12-01
Nowadays, the need to increase pavement service life, guarantee high performance, reduce service and maintenance costs has been turned a greater attention on the use of reinforcements. This paper presents findings of a numerical investigation on geogrid reinforced flexible pavement roads, under wheel traffic loads, using a three-dimensional Finite Element Method (FEM). The results obtained show the effectiveness of glass fibre grids as reinforcement which, with appropriate design and correct installation, by improving interface shear resistance, can be used to expand the performance of flexible pavements in different ways: by increasing the road service life providing a relevant contribution against superficial rutting or by decreasing the construction costs due to the reduction in the reinforced HMA layer thickness and thus of mineral aggregate required for its construction.
Lang, Brian Hung-Hin; Wong, Carlos K H
2015-09-01
The issue of whether all incidental papillary thyroid microcarcinoma (PTMC) should be managed by early surgery (ES) has been questioned and there is a growing acceptance that a non-surgical approach (NSA) might be more appropriate. We conducted a cost-effectiveness analysis comparing the two strategies in managing incidental PTMC. Our base case was a hypothetical 40-year-old female diagnosed with a unifocal intra-thyroidal 9 mm PTMC. The PTMC was considered suitable for either strategy. A Markov decision tree model was constructed to compare the estimated cost-effectiveness between ES and NSA after 20 years. Outcome probabilities, utilities and costs were derived from the literature. The threshold for cost-effectiveness was set at USD 50,000/quality-adjusted life year (QALY). A further analysis was done for patients < 40 and ≥ 40 years. Sensitivity and threshold analyses were used to examine model uncertainty. Each patient who adopted NSA over ES cost an extra USD 682.54 but gained an additional 0.260 QALY. NSA was cost saving (i.e. less costly and more effective) up to 16 years from diagnosis and remained cost-effective from 17 years onward. In the sensitivity analysis, NSA remained cost-effective regardless of patient age (< 40 and ≥ 40 years), complications, rates of progression, year cycle and discount rate. In the threshold analysis, none of the scenarios that could have changed the conclusion appeared clinically likely. For a selected group of incidental PTMC, adopting NSA was not only cost saving in the initial 16 years but also remained cost effective thereafter. This was irrespective of patient age, complication rate or rate of PTMC progression. © 2015 European Society of Endocrinology.
NASA Astrophysics Data System (ADS)
Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul
2017-08-01
Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Protons in head-and-neck cancer: bridging the gap of evidence.
Ramaekers, Bram L T; Grutters, Janneke P C; Pijls-Johannesma, Madelon; Lambin, Philippe; Joore, Manuela A; Langendijk, Johannes A
2013-04-01
To use Normal Tissue Complication Probability (NTCP) models and comparative planning studies to explore the (cost-)effectiveness of swallowing sparing intensity modulated proton radiotherapy (IMPT) compared with swallowing sparing intensity modulated radiotherapy with photons (IMRT) in head and neck cancer (HNC). A Markov model was constructed to examine and compare the costs and quality-adjusted life years (QALYs) of the following strategies: (1) IMPT for all patients; (2) IMRT for all patients; and (3) IMPT if efficient. The assumption of equal survival for IMPT and IMRT in the base case analysis was relaxed in a sensitivity analysis. Intensity modulated proton radiation therapy and IMRT for all patients yielded 6.620 and 6.520 QALYs and cost €50,989 and €41,038, respectively. Intensity modulated proton radiation therapy if efficient yielded 6.563 QALYs and cost €43,650. The incremental cost-effectiveness ratio of IMPT if efficient versus IMRT for all patients was €60,278 per QALY gained. In the sensitivity analysis, IMRT was more effective (0.967 QALYs) and less expensive (€8218) and thus dominated IMPT for all patients. Cost-effectiveness analysis based on normal tissue complication probability models and planning studies proved feasible and informative and enables the analysis of individualized strategies. The increased effectiveness of IMPT does not seem to outweigh the higher costs for all head-and-neck cancer patients. However, when assuming equal survival among both modalities, there seems to be value in identifying those patients for whom IMPT is cost-effective. Copyright © 2013 Elsevier Inc. All rights reserved.
Reduction of enteric infectious disease in rural China by providing deep-well tap water.
Wang, Z. S.; Shepard, D. S.; Zhu, Y. C.; Cash, R. A.; Zhao, R. J.; Zhu, Z. X.; Shen, F. M.
1989-01-01
Enteric infectious disease (EID), defined here as bacillary dysentery, viral hepatitis A, El Tor cholera, or acute watery diarrhoea, is an important public health problem in most developing countries. This study assessed the impact on EID of providing deep-well tap water (DWTW) through household taps in rural China. For this purpose, we compared the incidence of EID in six study villages (population, 10,290) in Qidong County that had DWTW with that in six control villages (population 9397) that had only surface water. Both the bacterial counts and chemical properties of the DWTW met established hygiene standards for drinking water. The incidence of EID in the study region was 38.6% lower than in the control region; however, the introduction of DWTW supplies did not significantly affect the incidence of bacillary dysentery. These results indicate that the construction and use of DWTW systems with household taps is associated with decreased incidences of El Tor cholera, viral hepatitis A, and acute watery diarrhoea. Since high construction costs have led many authorities to question the value of DWTW, we carried out a cost-benefit analysis of the programme. The cost of constructing a DWTW system averaged US $36,000 at 1983 prices, or US $10.50 per capita. The combined capital and operating costs of a DWTW system were US $1.46 per capita per annum over its 20-year estimated life. The benefits derived from reductions in cost of illness and savings in time to fetch water were 2.2 times the costs at present values Capital outlays were recouped in a 3.6-year payback period and the provision of DWTW proved highly beneficial in both economic and social terms. PMID:2501042
Do We Really Know how Much it Costs to Construct High Performance Buildings?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Livingston, Olga V.; Dillon, Heather E.; Halverson, Mark A.
2012-08-31
Understanding the cost of energy efficient construction is critical to decision makers in building design, code development, and energy analysis. How much does it cost to upgrade from R-13 to R-19 in a building wall? How much do low-e windows really cost? Can we put a dollar figure on commissioning? Answers to these questions have a fuzzy nature, based on educated guesses and industry lore. The response depends on location, perspective, bulk buying, and hand waving. This paper explores the development of a web tool intended to serve as a publicly available repository of building component costs. In 2011 themore » U.S. Department of Energy (DOE) funded the launch of a web tool called the Building Component Cost Community (BC3), dedicated to publishing building component costs from documented sources, actively gathering verifiable cost data from the users, and collecting feedback from a wide range of participants on the quality of the posted cost data. The updated BC3 database, available at http://bc3.pnnl.gov, went live on April 30, 2012. BC3 serves as the ultimate source of the energy-related component costs for DOE’s residential code development activities, including cost-effectiveness analyses. The paper discusses BC3 objectives, structure, functionality and the current content of the database. It aims to facilitate a dialog about the lack of verifiable transparent cost data, as well as introduce a web tool that helps to address the problem. The questions posed above will also be addressed by this paper, but they have to be resolved by the user community by providing feedback and cost data to the BC3 database, thus increasing transparency and removing information asymmetry.« less
DOT National Transportation Integrated Search
2006-08-01
Utility conflicts are unfortunately a common occurrence on many roadway projects. This report examines the frequency and severity of utility conflicts both within and outside of Kentucky. Understanding which type of utility conflicts most likely occu...
Cost Effective Analysis of Recycled Products for Use in Highway Construction.
DOT National Transportation Integrated Search
1998-04-01
Over 4.5 billion of non-hazardous wastes are generated in the United States each year. Out of these wastes over 200 million tons of post consumer waste is generated. The disposal of post consumer waste is the responsibility of municipality and societ...
Analysis of Design Changes on Navy Construction Projects
1991-12-01
Percent of Changes by Reason ...................... 47 6-6 Percent of Cost for Changes by Reaon ..............48 I- A vi GLOSSARY OF TERMS ARCHITECT...Department of Defense (DoD) for the acquisition of goods and services prior to 1084 which was replaced by the Federal Acquisition Regulations (FAR
Projected Costs of U.S. Nuclear Forces, 2014 to 2023
2013-12-01
uranium and pluto- nium, and also includes several large construction projects for new facilities to support that mission); $12 billion is for...contributed to the analysis with guidance from Sarah Jennings. Justin Falk of CBO provided helpful comments on the report, as did Russell Rumbaugh
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sims, A.V.; Racine, W.C.
1977-12-01
Results of a study to determine the technical, economic, and environmental feasibility of geothermal district heating for Mammoth Lakes Village, California are reported. The geothermal district heating system selected is technically feasible and will use existing technology in its design and operation. District heating can provide space and water heating energy for typical customers at lower cost than alternative sources of energy. If the district heating system is investor owned, lower costs are realized after five to six years of operation, and if owned by a nonprofit organization, after zero to three years. District heating offers lower costs than alternativesmore » much sooner in time if co-generation and/or DOE participation in system construction are included in the analysis. During a preliminary environmental assessment, no potential adverse environmental impacts could be identified of sufficient consequence to preclude the construction and operation of the proposed district heating system. A follow-on program aimed at implementing district heating in Mammoth is outlined.« less
Early versus late parenteral nutrition in ICU patients: cost analysis of the EPaNIC trial
2012-01-01
Introduction The EPaNIC randomized controlled multicentre trial showed that postponing initiation of parenteral nutrition (PN) in ICU-patients to beyond the first week (Late-PN) enhanced recovery, as compared with Early-PN. This was mediated by fewer infections, accelerated recovery from organ failure and reduced duration of hospitalization. Now, the trial's preplanned cost analysis (N = 4640) from the Belgian healthcare payers' perspective is reported. Methods Cost data were retrieved from individual patient invoices. Undiscounted total healthcare costs were calculated for the index hospital stay. A cost tree based on acquisition of new infections and on prolonged length-of-stay was constructed. Contribution of 8 cost categories to total hospitalization costs was analyzed. The origin of drug costs was clarified in detail through the Anatomical Therapeutic Chemical (ATC) classification system. The potential impact of Early-PN on total hospitalization costs in other healthcare systems was explored in a sensitivity analysis. Results ICU-patients developing new infection (24.4%) were responsible for 42.7% of total costs, while ICU-patients staying beyond one week (24.3%) accounted for 43.3% of total costs. Pharmacy-related costs represented 30% of total hospitalization costs and were increased by Early-PN (+608.00 EUR/patient, p = 0.01). Notably, costs for ATC-J (anti-infective agents) (+227.00 EUR/patient, p = 0.02) and ATC-B (comprising PN) (+220.00 EUR/patient, p = 0.006) drugs were increased by Early-PN. Sensitivity analysis revealed a mean total cost increase of 1,210.00 EUR/patient (p = 0.02) by Early-PN, when incorporating the full PN costs. Conclusions The increased costs by Early-PN were mainly pharmacy-related and explained by higher expenditures for PN and anti-infective agents. The use of Early-PN in critically ill patients can thus not be recommended for both clinical (no benefit) and cost-related reasons. Trial registration ClinicalTrials.gov NCT00512122. PMID:22632574
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents comparative data on college and university residence hall construction projects, including construction costs, size, numbers of students, and cost per square foot. Also provides comparative housing cost data over the past decade and identifies types of amenities being added to dormitories. (GR)
Sabharwal, S; Carter, A W; Rashid, A; Darzi, A; Reilly, P; Gupte, C M
2016-02-01
The aims of this study were to estimate the cost of surgical treatment of fractures of the proximal humerus using a micro-costing methodology, contrast this cost with the national reimbursement tariff and establish the major determinants of cost. A detailed inpatient treatment pathway was constructed using semi-structured interviews with 32 members of hospital staff. Its content validity was established through a Delphi panel evaluation. Costs were calculated using time-driven activity-based costing (TDABC) and sensitivity analysis was performed to evaluate the determinants of cost The mean cost of the different surgical treatments was estimated to be £3282. Although this represented a profit of £1138 against the national tariff, hemiarthroplasty as a treatment choice resulted in a net loss of £952. Choice of implant and theatre staffing were the largest cost drivers. Operating theatre delays of more than one hour resulted in a loss of income Our findings indicate that the national tariff does not accurately represent the cost of treatment for this condition. Effective use of the operating theatre and implant discounting are likely to be more effective cost containment approaches than control of bed-day costs. This cost analysis of fractures of the proximal humerus reinforces the limitations of the national tariff within the English National Health Service, and underlines the importance of effective use of the operating theatre, as well as appropriate implant procurement where controlling costs of treatment is concerned. ©2016 The British Editorial Society of Bone & Joint Surgery.
Costs and cost-effectiveness of pediatric inguinal hernia repair in Uganda.
Eeson, Gareth; Birabwa-Male, Doreen; Pennington, Mark; Blair, Geoffrey K
2015-02-01
Surgically treatable diseases contribute approximately 11% of disability-adjusted life years (DALYs) worldwide yet they remain a neglected public health priority in low- and middle-income countries (LMICs). Pediatric inguinal hernia is the most common congenital abnormality in newborns and a major cause of morbidity and mortality yet elective repair remains largely unavailable in LMICs. This study is aimed to determine the costs and cost-effectiveness of pediatric inguinal hernia repair (PIHR) in a low-resource setting. Medical costs of consecutive elective PIHRs were recorded prospectively at two centers in Uganda. Decision modeling was used to compare two different treatment scenarios (adoption of PIHR and non-adoption) from a provider perspective. A Markov model was constructed to estimate health outcomes under each scenario. The robustness of the cost-effectiveness results in the base case analysis was tested in one-way and probabilistic sensitivity analysis. The primary outcome of interest was cost per DALY averted by the intervention. Sixty-nine PIHRs were performed in 65 children (mean age 3.6 years). Mean cost per procedure was $86.68 US (95% CI 83.1-90.2 USD) and averted an average of 5.7 DALYs each. Incremental cost-effectiveness ratio was $12.41 per DALY averted. The probability of cost-effectiveness was 95% at a cost-effectiveness threshold of $35 per averted DALY. Results were robust to sensitivity analysis under all considered scenarios. Elective PIHR is highly cost-effective for the treatment and prevention of complications of hernia disease even in low-resource settings. PIHR should be prioritized in LMICs alongside other cost-effective interventions.
48 CFR 9904.417-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be added to the construction-in-progress account in recognition of the cost of money related to... should be added to the construction-in-progress account in recognition of the cost of money while under... the costs were incurred at a fairly uniform rate throughout the period. Because of the pattern of cost...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Specially Adapted Housing; Cost-of-Construction Index AGENCY: Department of Veterans Affairs. ACTION: Notice... SAH assistance annually based on a residential home cost-of-construction index. The Secretary uses the Turner Building Cost Index for this purpose. During the most recent calendar year for which the Turner...
NASA Astrophysics Data System (ADS)
Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos
2015-06-01
Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. Because statewide codes are enforced by local officials, these problems may increase over time as energy standards change and become more complex and as other standards (eg, health and safety codes) remain a higher priority. The California Energy Commission realizes that code enforcement by itself is insufficient and expects that additional educational and technical assistance efforts (eg, manuals, training programs, and toll-free telephone lines) will ameliorate these problems.« less
Literature review of methods to determine road user costs in construction zones
DOT National Transportation Integrated Search
1997-01-01
As freeway construction increases with the need to expand, repair and maintain the existing infrastructure, the desire to quantify the inconvenience or delay costs to the user of the freeway undergoing construction has increased and become neccessary...
The cost-effectiveness of the Olweus Bullying Prevention Program: Results from a modelling study.
Beckman, Linda; Svensson, Mikael
2015-12-01
Exposure to bullying affects around 3-5 percent of adolescents in secondary school and is related to various mental health problems. Many different anti-bullying programmes are currently available, but economic evaluations are lacking. The aim of this study is to identify the cost effectiveness of the Olweus Bullying Prevention Program (OBPP). We constructed a decision-tree model for a Swedish secondary school, using a public payer perspective, and retrieved data on costs and effects from the published literature. Probabilistic sensitivity analysis to reflect the uncertainty in the model was conducted. The base-case analysis showed that using the OBPP to reduce the number of victims of bullying costs 131,250 Swedish kronor (€14,470) per victim spared. Compared to a relevant threshold of the societal value of bullying reduction, this indicates that the programme is cost-effective. Using a relevant willingness-to-pay threshold shows that the OBPP is a cost-effective intervention. Copyright © 2015 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.
Blasco, Antonio Javier; Llibre, Josep M; Arribas, José Ramón; Boix, Vicente; Clotet, Bonaventura; Domingo, Pere; González-García, Juan; Knobel, Hernando; López, Juan Carlos; Lozano, Fernando; Miró, José M; Podzamczer, Daniel; Santamaría, Juan Miguel; Tuset, Montserrat; Zamora, Laura; Lázaro, Pablo; Gatell, Josep M
2013-11-01
The GESIDA and National AIDS Plan panel of experts have proposed "preferred regimens" of antiretroviral treatment (ART) as initial therapy in HIV infected patients for 2013. The objective of this study is to evaluate the costs and effectiveness of initiating treatment with these "preferred regimens". An economic assessment of costs and effectiveness (cost/effectiveness) was performed using decision tree analysis models. Effectiveness was defined as the probability of having viral load <50copies/mL at week48, in an intention-to-treat analysis. Cost of initiating treatment with an ART regime was defined as the costs of ART and its consequences (adverse effects, changes of ART regime and drug resistance analyses) during the first 48weeks. The perspective of the analysis is that of the National Health System was applied, only taking into account differential direct costs: ART (official prices), management of adverse effects, resistance studies, and determination of HLA B*5701. The setting is Spain and the costs are those of 2013. A sensitivity deterministic analysis was performed, constructing three scenarios for each regimen: baseline, most favourable, and most unfavourable cases. In the baseline case scenario, the cost of initiating treatment ranges from 6,747euros for TDF/FTC+NVP to 12,059euros for TDF/FTC+RAL. The effectiveness ranges between 0.66 for ABC/3TC+LPV/r and ABC/3TC+ATV/r, and 0.87 for TDF/FTC+RAL and ABC/3TC+RAL. Effectiveness, in terms of cost/effectiveness, varies between 8,396euros and 13,930euros per responder at 48weeks, for TDF/FTC/RPV and TDF/FTC+RAL, respectively. Taking ART at official prices, the most effective regimen was TDF/FTC/RPV, followed by the rest of non-nucleoside containing regimens. The sensitivity analysis confirms the robustness of these findings. Copyright © 2013 Elsevier España, S.L. All rights reserved.
Ertefaie, Ashkan; Lucy, Xi; Lynch, Kevin G.; McKay, James R.; Oslin, David; Almirall, Daniel
2016-01-01
Aims To demonstrate how Q-learning, a novel data analysis method, can be used with data from a sequential, multiple assignment, randomized trial (SMART) to construct empirically an adaptive treatment strategy (ATS) that is more tailored than the ATSs already embedded in a SMART. Method We use Q-learning with data from the Extending Treatment Effectiveness of Naltrexone (ExTENd) SMART (N=250) to construct empirically an ATS employing naltrexone, behavioral intervention, and telephone disease management to reduce alcohol consumption over 24 weeks in alcohol dependent individuals. Results Q-learning helped to identify a subset of individuals who, despite showing early signs of response to naltrexone, require additional treatment to maintain progress. Conclusions Q-learning can inform the development of more cost-effective, stepped-care strategies for treating substance use disorders. PMID:28029718
Lévesque, Renee; Marcelli, Daniele; Cardinal, Héloïse; Caron, Marie-Line; Grooteman, Muriel P C; Bots, Michiel L; Blankestijn, Peter J; Nubé, Menso J; Grassmann, Aileen; Canaud, Bernard; Gandjour, Afschin
2015-12-01
The aim of this study was to assess the cost effectiveness of high-efficiency on-line hemodiafiltration (OL-HDF) compared with low-flux hemodialysis (LF-HD) for patients with end-stage renal disease (ESRD) based on the Canadian (Centre Hospitalier de l'Université de Montréal) arm of a parallel-group randomized controlled trial (RCT), the CONvective TRAnsport STudy. An economic evaluation was conducted for the period of the RCT (74 months). In addition, a Markov state transition model was constructed to simulate costs and health benefits over lifetime. The primary outcome was costs per quality-adjusted life-year (QALY) gained. The analysis had the perspective of the Quebec public healthcare system. A total of 130 patients were randomly allocated to OL-HDF (n = 67) and LF-HD (n = 63). The cost-utility ratio of OL-HDF versus LF-HD was Can$53,270 per QALY gained over lifetime. This ratio was fairly robust in the sensitivity analysis. The cost-utility ratio was lower than that of LF-HD compared with no treatment (immediate death), which was Can$93,008 per QALY gained. High-efficiency OL-HDF can be considered a cost-effective treatment for ESRD in a Canadian setting. Further research is needed to assess cost effectiveness in other settings and healthcare systems.
NASA Astrophysics Data System (ADS)
1982-05-01
The technical and economic feasibility of producing motor fuel alcohol from corn in a 100 million gallon per year plant to be constructed in Myrtle Grove, Louisiana is evaluated. The evaluation includes a detailed process design using proven technology, a capital cost estimate for the plant, a detailed analysis of the annual operating cost, a market study, a socioeconomic, environmental, health and safety analysis, and a complete financial analysis. Several other considerations for production of ethanol were evaluated including: cogeneration and fuel to be used in firing the boilers; single by-products vs. multiple by-products; and use of boiler flue gas for by-product drying.
Sharifi, Emile; Porco, Travis C; Naseri, Ayman
2009-10-01
To evaluate the cost-effectiveness of intracameral cefuroxime for postoperative endophthalmitis prophylaxis, and to determine the efficacy threshold necessary for alternative antibiotics to attain cost-effective equivalence with intracameral cefuroxime. Cost-effectiveness analysis. We study a hypothetical cohort of 100,000 patients undergoing cataract surgery as a part of the cost analysis. A cost-effectiveness model was constructed to analyze different antibiotic prophylactic regimens for postoperative endophthalmitis with intracameral cefuroxime as our base case. Efficacy was defined as the absolute reduction in rate of infection from background rate of infection, which was sourced from the literature. Antibiotic cost data were derived from the Red Book 2007 edition, and salary data were taken from the United States Bureau of Labor Statistics. Multivariate sensitivity analysis assessed the performance of antibiotic options under different scenarios. Cost per case of endophthalmitis prevented; theoretical maximal cost-effectiveness; efficacy threshold necessary to achieve cost-effective equivalence with intracameral cefuroxime; ratio indicating how many times more effective or less expensive alternative antibiotics would have to be to achieve cost-effective equivalence with intracameral cefuroxime. The cost-effectiveness ratio for intracameral cefuroxime is $1403 per case of postoperative endophthalmitis prevented. By comparison, the least expensive topical fluoroquinolone in our study, ciprofloxacin, would have to be >8 times more effective than intracameral cefuroxime to achieve cost-effective equivalence. The most expensive topical fluoroquinolones studied, gatifloxacin and moxifloxacin, would have to be > or =19 times more effective than intracameral cefuroxime to achieve cost-effective equivalence. A sensitivity analysis reveals that even in the worst case scenario for intracameral cefuroxime efficacy and with a 50% reduction in the cost of 4th-generation fluoroquinolones, gatifloxacin and moxifloxacin would have to be > or =9 times more effective than intracameral cefuroxime to achieve cost-effective equivalence. Administration of intracameral cefuroxime is relatively cost-effective in preventing endophthalmitis after cataract surgery. Owing to their high costs, many commonly used topical antibiotics are not cost-effective compared with intracameral cefuroxime, even under optimistic assumptions about their efficacy.
Cost-effectiveness of point-of-care testing for dehydration in the pediatric ED.
Whitney, Rachel E; Santucci, Karen; Hsiao, Allen; Chen, Lei
2016-08-01
Acute gastroenteritis (AGE) and subsequent dehydration account for a large proportion of pediatric emergency department (PED) visits. Point-of-care (POC) testing has been used in conjunction with clinical assessment to determine the degree of dehydration. Despite the wide acceptance of POC testing, little formal cost-effective analysis of POC testing in the PED exists. We aim to examine the cost-effectiveness of using POC electrolyte testing vs traditional serum chemistry testing in the PED for children with AGE. This was a cost-effective analysis using data from a randomized control trial of children with AGE. A decision analysis model was constructed to calculate cost-savings from the point of view of the payer and the provider. We used parameters obtained from the trial, including cost of testing, admission rates, cost of admission, and length of stay. Sensitivity analyses were performed to evaluate the stability of our model. Using the data set of 225 subjects, POC testing results in a cost savings of $303.30 per patient compared with traditional serum testing from the point of the view of the payer. From the point-of-view of the provider, POC testing results in consistent mean savings of $36.32 ($8.29-$64.35) per patient. Sensitivity analyses demonstrated the stability of the model and consistent savings. This decision analysis provides evidence that POC testing in children with gastroenteritis-related moderate dehydration results in significant cost savings from the points of view of payers and providers compared to traditional serum chemistry testing. Copyright © 2016 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Willis, P. B.; Baum, B.; White, R. A.
1978-01-01
The results of an investigation of solar module encapsulation systems applicable to the Low-Cost Solar Array Project 1986 cost and performance goals are presented. Six basic construction elements were identified and their specific uses in module construction defined. A uniform coating basis was established for each element. The survey results were also useful in revealing price ranges for classes of materials and estimating the cost allocation for each element within the encapsulating cost goal. The six construction elements were considered to be substrates, superstrates, pottants, adhesives, outer covers and back covers.
Penno, Erin; Gauld, Robin; Audas, Rick
2013-11-08
Population-based funding formulae act as an important means of promoting equitable health funding structures. To evaluate how policy makers in different jurisdictions construct health funding formulae and build an understanding of contextual influences underpinning formula construction we carried out a comparative analysis of key components of funding formulae across seven high-income and predominantly publically financed health systems: New Zealand, England, Scotland, the Netherlands, the state of New South Wales in Australia, the Canadian province of Ontario, and the city of Stockholm, Sweden. Core components from each formula were summarised and key similarities and differences evaluated from a compositional perspective. We categorised approaches to constructing funding formulae under three main themes: identifying factors which predict differential need amongst populations; adjusting for cost factors outside of needs factors; and engaging in normative correction of allocations for 'unmet' need. We found significant congruence in the factors used to guide need and cost adjustments. However, there is considerable variation in interpretation and implementation of these factors. Despite broadly similar frameworks, there are distinct differences in the composition of the formulae across the seven health systems. Ultimately, the development of funding formulae is a dynamic process, subject to availability of data reflecting health needs, the influence of wider socio-political objectives and health system determinants.
A Semantics-Based Approach to Construction Cost Estimating
ERIC Educational Resources Information Center
Niknam, Mehrdad
2015-01-01
A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…
Using Sustainable Development as a Competitive Strategy
NASA Astrophysics Data System (ADS)
Spearman, Pat
Sustainable development reduces construction waste by 43%, generating 50% cost savings. Residential construction executives lacking adequate knowledge regarding the benefits of sustainable development practices are at a competitive disadvantage. Drawing from the diffusion of innovation theory, the purpose of this qualitative case study was to explore knowledge acquisition within the bounds of sustainable residential construction. The purposive sample size of 11 executive decision makers fulfilled the sample size requirements and enabled the extraction of meaningful data. Participants were members of the National Home Builders Association and had experience of a minimum of 5 years in residential construction. The research question addressed how to improve knowledge acquisition relating to the cost benefits of building green homes and increase the adoption rate of sustainable development among residential builders. Data were collected via semistructured telephone interviews, field observation, and document analysis. Transcribed data were validated via respondent validation, coded into 5 initial categories aligned to the focus of the research, then reduced to 3 interlocking themes of environment, competitive advantage, and marketing. Recommendations include developing comprehensive public policies, horizontal and vertical communications networks, and green banks to capitalize sustainable development programs to improve the diffusion of green innovation as a competitive advantage strategy. Business leaders could benefit from this data by integrating sustainable development practices into their business processes. Sustainable development reduces operational costs, increases competitive advantage for builders, and reduces greenhouse gas emissions. Implications for social change increase energy independence through conservation and developing a legislative policy template for comprehensive energy strategies. A comprehensive energy strategy promotes economic development, technological gains in all business sectors within the energy industry, and reduces energy costs for consumers.
Exploring the Deployment Potential of Small Modular Reactors
NASA Astrophysics Data System (ADS)
Abdulla, Ahmed Y.
This thesis reports the results of several investigations into the viability of an emergent technology. Due to the lack of data in such cases, and the sensitivity surrounding nuclear power, exploring the potential of small modular reactors (SMRs) proved challenging. Moreover, these reactors come in a wide range of sizes and can employ a number of technologies, which made investigating the category as a whole difficult. We started by looking at a subset of SMRs that were the most promising candidates for near to mid-term deployment: integral light water SMRs. We conducted a technically detailed elicitation of expert assessments of their capital costs and construction duration, focusing on five reactor deployment scenarios that involved a large reactor and two light water SMRs. Consistent with the uncertainty introduced by past cost overruns and construction delays, median estimates of the cost of new large plants varied by more than a factor of 2.5. Expert judgments about likely SMR costs displayed an even wider range. There was consensus that an SMR plant's construction duration would be shorter than a large reactor's. Experts identified more affordable unit cost, factory fabrication, and shorter construction schedules as factors that may make light water SMRs economically viable, though these reactors do not constitute a paradigm shift when it comes to nuclear power's safety and security. Using these expert assessments of cost and construction duration, we calculated levelized cost of electricity values for four of the five scenarios. For the large plant, median levelized cost estimates ranged from 56 to 120 per MWh. Median estimates of levelized cost ranged from 77 to 240 per MWh for a 45MWe SMR, and from 65 to 120 per MWh for a 225MWe unit. We concluded that controlling construction duration is important, though not as important a factor in the analysis as capital cost, and, given the price of electricity in some parts of the U.S., it is possible to construct an argument for deploying SMRs in certain locations. We then decided to investigate the technical and institutional barriers hampering the development and deployment of a subset of six SMRs, including two light water designs and four non-light water advanced designs. We organized an invitational workshop that became an integrated assessment of various designs and of the institutional innovations required to bring SMRs to market. Some valuable insights were gleaned from the workshop: there is consensus that many of the challenges facing advanced SMRs are rooted in institutional biases in favor of the light water economy, as opposed to technical ones. The institutional factors that are judged to pose the greatest challenge to the mass deployment of SMRs are: the lack of a greenhouse gas control regime; political and financial instability; public concerns about nuclear safety and waste; and inadequate national and international institutions. When asked what factors most help promote SMR adoption in OECD and developing countries, economic factors dominate the list of characteristics that most contribute to their promotion in OECD countries but, when it comes to developing countries, institutional factors are regarded as being of highest import. Safety of design and safety in operation are judged the most important characteristic on both lists.
Computer Review Can Cut HVAC Energy Use
ERIC Educational Resources Information Center
McClure, Charles J. R.
1974-01-01
A computerized review of construction bidding documents, usually done by a consulting engineer, can reveal how much money it will cost to operate various alternative types of HVAC equipment over a school's lifetime. The review should include a computerized load calculation, energy systems flow diagram, control system analysis, and a computerized…
NASA Astrophysics Data System (ADS)
Graboski, A. J.
2016-12-01
The Department of Defense (DoD) is planning over $600M in military construction on Eielson Air Force Base (AFB) within the next three fiscal years. Although many studies have been conducted on permafrost and climate change, the future of our climate as well as any impacts on arctic infrastructure, remains unclear. This research focused on future climate predictions to determine likely scenarios for the United States Air Force's Strategic Planners to consider. This research also looked at various construction methods being used by industry to glean best practices to incorporate into future construction in order to determine cost factors to consider when permafrost soils may be encountered. The most recent 2013 International Panel on Climate Change (IPCC) report predicts a 2.2ºC to 7.8ºC temperature rise in Arctic regions by the end of the 21st Century in the Representative Concentration Pathways, (RCP4.5) emissions scenario. A regression model was created using archived surface observations from 1944 to 2016. Initial analysis using regression/forecast techniques show a 1.17ºC temperature increase in the Arctic by the end of the 21st Century. Historical DoD construction data was then used to determine an appropriate cost factor. Applying statistical tests to the adjusted climate predictions supports continued usage of current DoD cost factors of 2.13 at Eielson and 2.97 at Thule AFBs as they should be sufficient when planning future construction projects in permafrost rich areas. These cost factors should allow planners the necessary funds to plan foundation mitigation techniques and prevent further degradation of permafrost soils around airbase infrastructure. This current research focused on Central Alaska while further research is recommended on the Alaskan North Slope and Greenland to determine climate change impacts on critical DoD infrastructure.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
1985-09-01
BSTRACT This study uses a systems analysis approach to determine the communications technical control needs of the Fleet Marine Force as the transition...subsequent analysis and decision. In the acquisi- tion of military systems, it is typical to find these assumptions used to construct various measures of...relatively free from the typical underlying estimates used in cost and operational effective- ness analysis (COEA) type studies which are designed to compare
Optimization of Cost of Building with Concrete Slabs Based on the Maturity Method
NASA Astrophysics Data System (ADS)
Skibicki, Szymon
2017-10-01
The maturity method is a well-known technique for determination of mechanical properties of the concrete (e.g. compressive strength) based on the development of temperature during hardening. The compressive strength of concrete can be used to determine necessary striking time of the formwork. Use of this method for this purpose is economically effective and provides necessary safety measures. This method is used in many construction sites. Time of formwork striking depends on many factors e. g. class of concrete, grade of cement, type of cement, temperature, size of the element and air humidity. The existing technical Standards and scientific research on the striking of formwork present different estimated for the striking time. Striking time for the main structural elements ranges from 14 to 21 days. For structura elements such as slabs or beams with a span of more than 6 m need to reach the minimum of 70-85% of their designed strength to remove the formwork depend on the Standards. During the construction of the buildings in summer concrete acquires the required strength for striking of the formwork faster due to the higher ambient temperature. Knowing the maturity method, we are able to estimate the compressive strength of concrete. If concrete have the required strength, the striking time can be shortened. This allows to reduce the overall costs of construction. The more concrete works are done during the construction phase the bigger the generated savings. In this article formwork striking time for concrete slabs in building based on maturity method was determined. The structure was subjected to 10 different simulated weather conditions typical for the Central and Western Europe that varied by localization of the construction. Based on simulated weather conditions the temperature in structural elements was established. The results allowed to determine the formwork striking time using the maturity method. Presented analysis shows that use of the maturity method on construction site can result in lower overall costs due to shorter time of constructing.
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sale which includes specified road construction with total estimated construction costs of $50,000 or more, the advertisement shall also include: (1) The total estimated construction cost of the permanent roads. (2) A statement extending to small business concerns qualified for preferential bidding on timber...
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Ruiz, Juan Gabriel; Charpak, Nathalie; Castillo, Mario; Bernal, Astrid; Ríos, John; Trujillo, Tammy; Córdoba, María Adelaida
2017-06-01
Although kangaroo mother care (KMC) has been shown to be safe and effective in randomized controlled trials (RCTs), there are no published complete economic evaluations including the three components of the full intervention. A cost utility analysis performed on the results of an RCT conducted in Bogotá, Colombia between 1993 and 1996. Hospital and ambulatory costs were estimated by microcosting in a sample of preterm infants from a University Hospital in Bogotá in 2011 and at a KMC clinic in the same period. Utility scores were assigned by experts by means of (1) direct ordering and scoring discrete health states and (2) constructing a multi-attribute utility function. Ninety-five percent confidence intervals (CIs) for the incremental cost-utility ratios (ICURs) were computed by the Fiellers theorem method. One-way sensitivity analysis on price estimates for valuing costs was performed. ICUR at 1 year of corrected age was $ -1,546 per extra quality-adjusted life year gained using the KMC method (95% CI $ -7,963 to $ 4,910). In Bogotá, the use of KMC is dominant: more effective and cost-saving. Although results from an economic analysis should not be extrapolated to different systems and communities, this dominant result suggests that KMC could be cost-effective in similar low and middle income countries settings. Copyright © 2016 Elsevier Inc. All rights reserved.
Kelly, V; Sagili, K D; Satyanarayana, S; Reza, L W; Chadha, S S; Wilson, N C
2015-06-01
With support from the Stop TB Partnership's TB REACH Wave 2 Grant, diagnostic microscopy services for tuberculosis (TB) were upgraded from conventional Ziehl-Neelsen (ZN) based sputum microscopy to light emitting diode technology-based fluorescence microscopy (LED FM) in 200 high-workload microscopy centres in India as a pilot intervention. To evaluate the cost-effectiveness of LED-FM over conventional ZN microscopy to inform further scale-up. A decision-tree model was constructed to assess the cost utility of LED FM over ZN microscopy. The results were summarised using incremental cost-effectiveness ratio (ICER); one-way and probabilistic sensitivity analyses were also conducted to address uncertainty within the model. Data were analysed from 200 medical colleges in 2011 and 2012, before and after the introduction of LED microscopes. A full costing analysis was carried out from the perspective of a national TB programme. The ICER was calculated at US$14.64 per disability-adjusted life-year, with an 82% probability of being cost-effective at a willingness-to-pay threshold equivalent to Indian gross domestic product per capita. LED FM is a cost-effective intervention for detecting TB cases in India at high-workload medical college settings.
High-fidelity, low-cost, automated method to assess laparoscopic skills objectively.
Gray, Richard J; Kahol, Kanav; Islam, Gazi; Smith, Marshall; Chapital, Alyssa; Ferrara, John
2012-01-01
We sought to define the extent to which a motion analysis-based assessment system constructed with simple equipment could measure technical skill objectively and quantitatively. An "off-the-shelf" digital video system was used to capture the hand and instrument movement of surgical trainees (beginner level = PGY-1, intermediate level = PGY-3, and advanced level = PGY-5/fellows) while they performed a peg transfer exercise. The video data were passed through a custom computer vision algorithm that analyzed incoming pixels to measure movement smoothness objectively. The beginner-level group had the poorest performance, whereas those in the advanced group generated the highest scores. Intermediate-level trainees scored significantly (p < 0.04) better than beginner trainees. Advanced-level trainees scored significantly better than intermediate-level trainees and beginner-level trainees (p < 0.04 and p < 0.03, respectively). A computer vision-based analysis of surgical movements provides an objective basis for technical expertise-level analysis with construct validity. The technology to capture the data is simple, low cost, and readily available, and it obviates the need for expert human assessment in this setting. Copyright © 2012 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
Construction of shipping channels in the Detroit River—History and environmental consequences
Bennion, David H.; Manny, Bruce A.
2011-01-01
The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.
The relationship between cost estimates reliability and BIM adoption: SEM analysis
NASA Astrophysics Data System (ADS)
Ismail, N. A. A.; Idris, N. H.; Ramli, H.; Rooshdi, R. R. Raja Muhammad; Sahamir, S. R.
2018-02-01
This paper presents the usage of Structural Equation Modelling (SEM) approach in analysing the effects of Building Information Modelling (BIM) technology adoption in improving the reliability of cost estimates. Based on the questionnaire survey results, SEM analysis using SPSS-AMOS application examined the relationships between BIM-improved information and cost estimates reliability factors, leading to BIM technology adoption. Six hypotheses were established prior to SEM analysis employing two types of SEM models, namely the Confirmatory Factor Analysis (CFA) model and full structural model. The SEM models were then validated through the assessment on their uni-dimensionality, validity, reliability, and fitness index, in line with the hypotheses tested. The final SEM model fit measures are: P-value=0.000, RMSEA=0.079<0.08, GFI=0.824, CFI=0.962>0.90, TLI=0.956>0.90, NFI=0.935>0.90 and ChiSq/df=2.259; indicating that the overall index values achieved the required level of model fitness. The model supports all the hypotheses evaluated, confirming that all relationship exists amongst the constructs are positive and significant. Ultimately, the analysis verified that most of the respondents foresee better understanding of project input information through BIM visualization, its reliable database and coordinated data, in developing more reliable cost estimates. They also perceive to accelerate their cost estimating task through BIM adoption.
[Urban ecological land in Changsha City: its quantitative analysis and optimization].
Li, Xiao-Li; Zeng, Guang-Ming; Shi, Lin; Liang, Jie; Cai, Qing
2010-02-01
In this paper, a hierarchy index system suitable for catastrophe progression method was constructed to comprehensively analyze and evaluate the status of ecological land construction in Changsha City in 2007. Based on the evaluation results, the irrationalities of the distribution pattern of Changsha urban ecological land were discussed. With the support of geographic information system (GIS), the ecological corridors of the urban ecological land were constructed by using the 'least-cost' modeling, and, in combining with conflict analysis, the optimum project of the urban ecological land was put forward, forming an integrated evaluation system. The results indicated that the ecological efficiency of urban ecological land in Changsha in 2007 was at medium level, with an evaluation value being 0.9416, and the quantitative index being relatively high but the coordination index being relatively low. The analysis and verification with software Fragstats showed that the ecological efficiency of the urban ecological land after optimization was higher, with the evaluation value being 0.9618, and the SHDI, CONTAG, and other indices also enhanced.
Cost-effectiveness analysis in melanoma detection: A transition model applied to dermoscopy.
Tromme, Isabelle; Legrand, Catherine; Devleesschauwer, Brecht; Leiter, Ulrike; Suciu, Stefan; Eggermont, Alexander; Sacré, Laurine; Baurain, Jean-François; Thomas, Luc; Beutels, Philippe; Speybroeck, Niko
2016-11-01
The main aim of this study is to demonstrate how our melanoma disease model (MDM) can be used for cost-effectiveness analyses (CEAs) in the melanoma detection field. In particular, we used the data of two cohorts of Belgian melanoma patients to investigate the cost-effectiveness of dermoscopy. A MDM, previously constructed to calculate the melanoma burden, was slightly modified to be suitable for CEAs. Two cohorts of patients entered into the model to calculate morbidity, mortality and costs. These cohorts were constituted by melanoma patients diagnosed by dermatologists adequately, or not adequately, trained in dermoscopy. Effectiveness and costs were calculated for each cohort and compared. Effectiveness was expressed in quality-adjusted life years (QALYs), a composite measure depending on melanoma-related morbidity and mortality. Costs included costs of treatment and follow-up as well as costs of detection in non-melanoma patients and costs of excision and pathology of benign lesions excised to rule out melanoma. The result of our analysis concluded that melanoma diagnosis by dermatologists adequately trained in dermoscopy resulted in both a gain of QALYs (less morbidity and/or mortality) and a reduction in costs. This study demonstrates how our MDM can be used in CEAs in the melanoma detection field. The model and the methodology suggested in this paper were applied to two cohorts of Belgian melanoma patients. Their analysis concluded that adequate dermoscopy training is cost-effective. The results should be confirmed by a large-scale randomised study. Copyright © 2016 Elsevier Ltd. All rights reserved.
Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soli Khericha; Edwin Harvego; John Svoboda
2012-01-01
The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less
NASA Technical Reports Server (NTRS)
Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.
1992-01-01
This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.
SNL/CA Facilities Management Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rabb, David; Clark, Eva
2014-12-01
At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
Barnhoorn, Karlijn; Staal, J Bart; van Dongen, Robert Tm; Frölke, Jan Paul M; Klomp, Frank P; van de Meent, Henk; Adang, Eddy; Nijhuis-van der Sanden, Maria Wg
2018-06-01
To analyze cost-effectiveness of Pain Exposure Physical Therapy compared to conventional treatment alongside a randomized controlled trial (NCT00817128) in patients with complex regional pain syndrome type 1, where no clinical difference was shown between the two groups in an intention-to-treat analysis. Randomized controlled trial with 9 months follow-up. Patients were recruited from hospitals and general practitioners in the region around a university hospital. A total of 56 patients, 45 (80.4%) female, were randomized. About 4 patients in the intervention and 11 patients in the conventional group switched groups. The mean (SD) age was 44.3 (16.6) years, and in 37 (66.1%) patients, the upper extremity was affected. Patients received either Pain Exposure Physical Therapy (maximum of five sessions), or conventional treatment conforming with the Dutch multidisciplinary guideline. For the economic evaluation difference between the groups in health-related quality of life (quality-adjusted life years (QALYs)), and the clinical outcomes Impairment level Sum Score-Restricted Version and Pain Disability was determined based on the intention-to-treat analysis as well as differences in both healthcare-related costs and travel expenses. Cost-effectiveness planes were constructed using bootstrapping to compare effects and costs. No significant effects were found for QALYs (mean difference = -0.02; 95% confidence interval (CI) -0.10 to 0.04) and clinical outcomes. A cost minimization analysis showed a significant difference in costs between groups. The conventional treatment was 64% more expensive than the Pain Exposure Physical Therapy. This economic analysis shows that Pain Exposure Physical Therapy compared to conventional treatment is cost-effective.
Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information
Lazenby, Gweneth Bratton; Unal, Elizabeth Ramsey; Andrews, Annie Lintzenich; Simpson, Kit
2014-06-01
Because of a high incidence of Trichomonas infection among HIV-positive women, annual screening and treatment are recommended. Trichomonas infection is associated with a 2-fold risk of HIV transmission. The objective of this study was to determine if annual screening is cost-effective for the prevention of new HIV cases in susceptible male partners secondary to Trichomonas infection in HIV-positive women. A decision tree analysis was constructed to model the costs of Trichomonas screening, treatment, and follow-up. 200 women cycled through the model for a period of 12 months. One hundred women were unscreened and 100 were screened and treated per recommendations. Annual Trichomonas screening and treatment saves US $553 (US $475- US $645) per woman in the prevention of HIV transmission to male partners. The cost-effectiveness of this strategy was maintained across all assumptions in a sensitivity analysis. Trichomonas screening and treatment for the purpose of decreasing new HIV infections is not only cost-effective but also cost saving in HIV-positive women. If Centers for Disease Control and Prevention treatment guidelines were followed in all HIV-positive women living in the United States, the lifetime cost of new HIV infections prevented would approximate US $159,264,000 and could potentially prevent new HIV cases secondary to female-to-male transmissions.
Hommer, A; Wickstrøm, J; Friis, M M; Steeds, C; Thygesen, J; Ferreras, A; Gouws, P; Buchholz, P
2008-04-01
To compare the efficacy and cost implications of the use of the intraocular pressure-lowering prostaglandin analogues bimatoprost, travoprost, and latanoprost as fixed-combination therapies with timolol, a beta-adrenergic receptor antagonist. A decision analytic cost-effectiveness model was constructed. Since no head-to-head studies comparing the three treatment options exist, the analysis was based on an indirect comparison. Hence, the model was based on efficacy data from five randomized, controlled, clinical studies. The studies were comparable with respect to study design, time horizon, patient population and type of end point presented. The measure of effectiveness was the percentage reduction of the intraocular pressure level from baseline. The cost evaluated was the cost of medication and clinical visits to the ophthalmologist. All drug costs were market prices inclusive of value-added tax, and visit costs were priced using official physician fees. Cost-effectiveness analyses were carried out in five European countries: Spain, Italy, United Kingdom, Norway and Sweden. The time horizon for the analyses was 3 months. The analysis showed that fixed-combination bimatoprost/timolol was more effective and less costly than fixed-combination travoprost/timolol and fixed-combination latanoprost/timolol in three out of the five countries analyzed. In two countries, bimatoprost/timolol was less costly than latanoprost/timolol, and cost the same as travoprost/timolol. This cost-effectiveness analysis showed that the fixed combination of bimatoprost 0.03%/timolol 0.5% administered once daily was a cost-effective treatment option for patients with primary open-angle glaucoma. This study was limited by available clinical data: without a head-to-head trial, indirect comparisons were necessary. In the United Kingdom, Sweden, Norway, Italy, and Spain, from a health service viewpoint, bimatoprost/timolol was a slightly more effective as well as less costly treatment strategy when compared to both travoprost/timolol and latanoprost/timolol.
Use Hardwoods for Building Components
Glenn A. Cooper; William W. Rice
1968-01-01
Describes a system for prefabricating structural units from hardwoods for use in floors, roofs, and walls of a-frame or post-and-beam type construction. The interior face of the unit is decorative paneling; the exterior face is sheathing. Use of the system could reduce prefabricated house construction costs compared to conventional construction costs.
Preservation treatment for wood bridge application
Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf
2009-01-01
Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...
Surrogate-based Analysis and Optimization
NASA Technical Reports Server (NTRS)
Queipo, Nestor V.; Haftka, Raphael T.; Shyy, Wei; Goel, Tushar; Vaidyanathan, Raj; Tucker, P. Kevin
2005-01-01
A major challenge to the successful full-scale development of modem aerospace systems is to address competing objectives such as improved performance, reduced costs, and enhanced safety. Accurate, high-fidelity models are typically time consuming and computationally expensive. Furthermore, informed decisions should be made with an understanding of the impact (global sensitivity) of the design variables on the different objectives. In this context, the so-called surrogate-based approach for analysis and optimization can play a very valuable role. The surrogates are constructed using data drawn from high-fidelity models, and provide fast approximations of the objectives and constraints at new design points, thereby making sensitivity and optimization studies feasible. This paper provides a comprehensive discussion of the fundamental issues that arise in surrogate-based analysis and optimization (SBAO), highlighting concepts, methods, techniques, as well as practical implications. The issues addressed include the selection of the loss function and regularization criteria for constructing the surrogates, design of experiments, surrogate selection and construction, sensitivity analysis, convergence, and optimization. The multi-objective optimal design of a liquid rocket injector is presented to highlight the state of the art and to help guide future efforts.
Managing large energy and mineral resources (EMR) projects in challenging environments
NASA Astrophysics Data System (ADS)
Chanmeka, Arpamart
The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.
NASA Astrophysics Data System (ADS)
Spišáková, Marcela; Mačková, Daniela
2015-11-01
The sustainable building has taken off in recent years with many investors looking for new and different methods of construction. The traditional building materials can be made out of natural materials, while others can help to lower energy costs of the occupant once built. Regardless of what the goal of the investor is, traditional building materials and their use is on the rise. The submitted paper provides an overview of natural building materials and possible modern building systems using these construction materials. Based on the questionnaire survey is defined the use potential of traditional building materials for the realization of the construction by methods of modern constructions and then are determined the drivers and barriers of traditional materials through using modern methods of construction. Considering the analysis of the achieved results, we can identify the gaps in the construction market in Slovakia and also to assess the perception of potential investors in the field of traditional building materials use, which is the purpose of submitted paper.
Competition in the economic crisis: Analysis of procurement auctions.
Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine
2015-01-01
We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
Illumina Unamplified Indexed Library Construction: An Automated Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang
Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.
Empirical Assessment of Spatial Prediction Methods for Location Cost Adjustment Factors
Migliaccio, Giovanni C.; Guindani, Michele; D'Incognito, Maria; Zhang, Linlin
2014-01-01
In the feasibility stage, the correct prediction of construction costs ensures that budget requirements are met from the start of a project's lifecycle. A very common approach for performing quick-order-of-magnitude estimates is based on using Location Cost Adjustment Factors (LCAFs) that compute historically based costs by project location. Nowadays, numerous LCAF datasets are commercially available in North America, but, obviously, they do not include all locations. Hence, LCAFs for un-sampled locations need to be inferred through spatial interpolation or prediction methods. Currently, practitioners tend to select the value for a location using only one variable, namely the nearest linear-distance between two sites. However, construction costs could be affected by socio-economic variables as suggested by macroeconomic theories. Using a commonly used set of LCAFs, the City Cost Indexes (CCI) by RSMeans, and the socio-economic variables included in the ESRI Community Sourcebook, this article provides several contributions to the body of knowledge. First, the accuracy of various spatial prediction methods in estimating LCAF values for un-sampled locations was evaluated and assessed in respect to spatial interpolation methods. Two Regression-based prediction models were selected, a Global Regression Analysis and a Geographically-weighted regression analysis (GWR). Once these models were compared against interpolation methods, the results showed that GWR is the most appropriate way to model CCI as a function of multiple covariates. The outcome of GWR, for each covariate, was studied for all the 48 states in the contiguous US. As a direct consequence of spatial non-stationarity, it was possible to discuss the influence of each single covariate differently from state to state. In addition, the article includes a first attempt to determine if the observed variability in cost index values could be, at least partially explained by independent socio-economic variables. PMID:25018582
ERIC Educational Resources Information Center
Kreider, Beth
1997-01-01
Discusses the benefits of dome architecture for a community's middle- and high-school multi-purpose facility. The dome construction is revealed as being cost effective in construction and in maintenance and energy costs. (GR)
Shell Structure Water Cellar’s Rapid Construct Technology
NASA Astrophysics Data System (ADS)
Xian Zhuang, Wen; Qing Yin, De; Chen, Shu Fa
2018-05-01
Tradition concrete water cellar’s problems, such as high cost, long construction term, easy to crack, are pointed out. A new construct method, and it’s matching airbag mould, of constructing concrete shell structure water cellars, are introduced. Combine with full-scale verifying cellar’s construct test, full-load water storage test, analyzed the technology in terms of construction term, cost, crack resistance, air bag pressure etc. It is believed that this new technology can successfully solve the problems that tradition technology has, and it will have a good prospect in rainfall resources utilization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
Code of Federal Regulations, 2014 CFR
2014-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
Code of Federal Regulations, 2013 CFR
2013-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
Life Cycle Cost Analysis of Ready Mix Concrete Plant
NASA Astrophysics Data System (ADS)
Topkar, V. M.; Duggar, A. R.; Kumar, A.; Bonde, P. P.; Girwalkar, R. S.; Gade, S. B.
2013-11-01
India, being a developing nation is experiencing major growth in its infrastructural sector. Concrete is the major component in construction. The requirement of good quality of concrete in large quantities can be fulfilled by ready mix concrete batching and mixing plants. The paper presents a technique of applying the value engineering tool life cycle cost analysis to a ready mix concrete plant. This will help an investor or an organization to take investment decisions regarding a ready mix concrete facility. No economic alternatives are compared in this study. A cost breakdown structure is prepared for the ready mix concrete plant. A market survey has been conducted to collect realistic costs for the ready mix concrete facility. The study establishes the cash flow for the ready mix concrete facility helpful in investment and capital generation related decisions. Transit mixers form an important component of the facility and are included in the calculations. A fleet size for transit mixers has been assumed for this purpose. The life cycle cost has been calculated for the system of the ready mix concrete plant and transit mixers.
Konijeti, Gauree G; Sauk, Jenny; Shrime, Mark G; Gupta, Meera; Ananthakrishnan, Ashwin N
2014-06-01
Clostridium difficile infection (CDI) is an important cause of morbidity and healthcare costs, and is characterized by high rates of disease recurrence. The cost-effectiveness of newer treatments for recurrent CDI has not been examined, yet would be important to inform clinical practice. The aim of this study was to analyze the cost effectiveness of competing strategies for recurrent CDI. We constructed a decision-analytic model comparing 4 treatment strategies for first-line treatment of recurrent CDI in a population with a median age of 65 years: metronidazole, vancomycin, fidaxomicin, and fecal microbiota transplant (FMT). We modeled up to 2 additional recurrences following the initial recurrence. We assumed FMT delivery via colonoscopy as our base case, but conducted sensitivity analyses based on different modes of delivery. Willingness-to-pay threshold was set at $50 000 per quality-adjusted life-year. At our base case estimates, initial treatment of recurrent CDI using FMT colonoscopy was the most cost-effective strategy, with an incremental cost-effectiveness ratio of $17 016 relative to oral vancomycin. Fidaxomicin and metronidazole were both dominated by FMT colonoscopy. On sensitivity analysis, FMT colonoscopy remained the most cost-effective strategy at cure rates >88.4% and CDI recurrence rates <14.9%. Fidaxomicin required a cost <$1359 to meet our cost-effectiveness threshold. In clinical settings where FMT is not available or applicable, the preferred strategy appears to be initial treatment with oral vancomycin. In this decision analysis examining treatment strategies for recurrent CDI, we demonstrate that FMT colonoscopy is the most cost-effective initial strategy for management of recurrent CDI.
NASA Astrophysics Data System (ADS)
Kowalski, Dariusz; Grzyl, Beata; Kristowski, Adam
2017-09-01
Steel materials, due to their numerous advantages - high availability, easiness of processing and possibility of almost any shaping are commonly applied in construction for carrying out basic carrier systems and auxiliary structures. However, the major disadvantage of this material is its high corrosion susceptibility, which depends strictly on the local conditions of the facility and the applied type of corrosion protection system. The paper presents an analysis of life cycle costs of structures installed on bridges used in the road lane conditions. Three anti-corrosion protection systems were considered, analyzing their essential cost components. The possibility of reducing significantly the costs associated with anti-corrosion protection at the stage of steel barriers maintenance over a period of 30 years has been indicated. The possibility of using a new approach based on the life cycle cost estimation in the anti-corrosion protection of steel elements is presented. The relationship between the method of steel barrier protection, the scope of repair, renewal work and costs is shown. The article proposes an optimal solution which, while reducing the cost of maintenance of road infrastructure components in the area of corrosion protection, allows to maintain certain safety standards for steel barriers that are installed on the bridge.
An, R; Xue, H; Wang, L; Wang, Y
2017-09-22
This study aimed to project the societal cost and benefit of an expansion of a water access intervention that promotes lunchtime plain water consumption by placing water dispensers in New York school cafeterias to all schools nationwide. A decision model was constructed to simulate two events under Markov chain processes - placing water dispensers at lunchtimes in school cafeterias nationwide vs. no action. The incremental cost pertained to water dispenser purchase and maintenance, whereas the incremental benefit was resulted from cases of childhood overweight/obesity prevented and corresponding lifetime direct (medical) and indirect costs saved. Based on the decision model, the estimated incremental cost of the school-based water access intervention is $18 per student, and the corresponding incremental benefit is $192, resulting in a net benefit of $174 per student. Subgroup analysis estimates the net benefit per student to be $199 and $149 among boys and girls, respectively. Nationwide adoption of the intervention would prevent 0.57 million cases of childhood overweight, resulting in a lifetime cost saving totalling $13.1 billion. The estimated total cost saved per dollar spent was $14.5. The New York school-based water access intervention, if adopted nationwide, may have a considerably favourable benefit-cost portfolio. © 2017 World Obesity Federation.
Zemplényi, A T; Kaló, Z; Kovács, G; Farkas, R; Beöthe, T; Bányai, D; Sebestyén, Z; Endrei, D; Boncz, I; Mangel, L
2018-01-01
The aim of our analysis was to compare the cost-effectiveness of high-dose intensity-modulated radiation therapy (IMRT) and hypofractionated intensity-modulated radiation therapy (HF-IMRT) versus conventional dose three-dimensional radiation therapy (3DCRT) for the treatment of localised prostate cancer. A Markov model was constructed to calculate the incremental quality-adjusted life years and costs. Transition probabilities, adverse events and utilities were derived from relevant systematic reviews. Microcosting in a large university hospital was applied to calculate cost vectors. The expected mean lifetime cost of patients undergoing 3DCRT, IMRT and HF-IMRT were 7,160 euros, 6,831 euros and 6,019 euros respectively. The expected quality-adjusted life years (QALYs) were 5.753 for 3DCRT, 5.956 for IMRT and 5.957 for HF-IMRT. Compared to 3DCRT, both IMRT and HF-IMRT resulted in more health gains at a lower cost. It can be concluded that high-dose IMRT is not only cost-effective compared to the conventional dose 3DCRT but, when used with a hypofractionation scheme, it has great cost-saving potential for the public payer and may improve access to radiation therapy for patients. © 2016 John Wiley & Sons Ltd.
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2011 CFR
2011-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, K.; Gates, C.
This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about ½ of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gates, C.; Neuhauser, K.
This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about 1/2 of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less
Game Theory Analysis of Bidding for A Construction Contract
NASA Astrophysics Data System (ADS)
Kembłowski, Marian W.; Grzyl, Beata; Siemaszko, Agata
2017-10-01
The authors are concerned with a bidding problem. There are two companies (P1 and P2) bidding for a highway construction project. In order to be more competitive, P1 considers buying a new gravel pit near the construction site. The basic cost of the pit is known to both companies. However, there is also an additional, hidden, cost (C) known only to P1. P2 is uncertain whether the hidden cost is C = 0 or C = x. P1 plans to bid for the job, but has to decide whether to buy the gravel pit. P2, not having a complete knowledge about C, thus not knowing the strategy choice of P1, has to decide if to bid for the job. In effect we have two payoff matrices, one for the additional cost C = 0, and the other one for C = x. If the probability of P2 bidding for the project can be estimated by propagating intelligence information through a Bayesian Belief Network, the best strategy for P1 can be readily determined. Otherwise, the solution calls for changing this game of incomplete information (players may or may not know some information about the other players, e.g., their “type,” their strategies, payoffs) into a game of imperfect information (players are simply unaware of the actions chosen by other players). This is achieved by introducing an additional “Nature” node which for this problem determines with some probability “p” the additional cost C= 0 (thus, C = x with probability 1-p). The solution of this game turns out to depend on the probability “p”. For some values of p the game is solved with pure strategies, whereas for other values the game is in equilibrium when the players randomly mix their strategies.
Epstein, Nancy E.
2012-01-01
Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321
The cost and analysis of nonuse of cochlear implants.
Raine, Christopher H; Summerfield, Quentin; Strachan, David R; Martin, Jane M; Totten, Catherine
2008-02-01
Analysis of the cost implications and reasons for nonuse of cochlear implants in an established cochlear implant unit. Clinical data were analyzed retrospectively to construct a table of cochlear implant use over time to identify nonuse and to suggest the reasons for this. Yorkshire Cochlear Implant Service is a tertiary referral center. Three hundred forty consecutively implanted patients from 1990 to 2005. Life table analysis showed that most children used their implant (p = 0.7 during 11 yr). However, 11 of 155 children and 2 of 185 adults became nonusers during the period of study. The 11 children stopped because of age at implant, educational placement, and family support. Two adults stopped because of psychological issues and inability to adapt to the signal. Surgical and implant costs have initial impact, with subsequent years' costs reflecting programming issues and maintenance. When considering nonuse, there are 2 effects: first, no more costs are incurred, and second, no more years of use are accumulated. Thus, nonuse reduces both costs and years. Costs of gaining a year of use as a function of time showed that there was little financial impact from the 11 children nonusers. As a ratio of "no nonuse" and observed "nonuse" in children, the ratio is 1.07 by 13 years of implantation (7%). The adult group was too few to analyze. The nonuse added 7% to the average cost. Retrospective audit identifies that patient selection by a multidisciplinary team is crucial to reducing nonuse.
NASA Astrophysics Data System (ADS)
González, M.; Montaño, M.; Hoyo, C.
2017-01-01
We have constructed a low cost fluorescence detector model to determine the presence of some heavy metals in an aqueous medium. In particular, we focus on metals which cause public health problems in our country. We did the first tests with standard samples of Hg (II). The innovative features of this instrument are its small dimensions (9 dm3) and the low cost of materials used in its construction.
Wong, Carlos K H; Lang, Brian Hung-Hin
2014-03-01
Although prophylactic central neck dissection (pCND) may reduce future locoregional recurrence after total thyroidectomy (TT) for low-risk papillary thyroid carcinoma (PTC), it is associated with a higher initial morbidity. We aimed to compare the long-term cost-effectiveness between TT with pCND (TT+pCND) and TT alone in the institution's perspective. Our case definition was a hypothetical cohort of 100,000 nonpregnant female patients aged 50 years with a 1.5-cm cN0 PTC within one lobe. A Markov decision tree model was constructed to compare the estimated cost-effectiveness between TT+pCND and TT alone after a 20-year period. Outcome probabilities, utilities, and costs were estimated from the literature. The threshold for cost-effectiveness was set at US$50,000 per quality-adjusted life year (QALY). Sensitivity and threshold analyses were used to examine model uncertainty. Each patient who underwent TT+pCND instead of TT alone cost an extra US$34.52 but gained an additional 0.323 QALY. In fact, in the sensitivity analysis, TT+pCND became cost-effective 9 years after the initial operation. In the threshold analysis, none of the scenarios that could change this conclusion appeared clinically possible or likely. However, TT+pCND became cost-saving (i.e., less costly and more cost-effective) at 20 years if associated permanent vocal cord palsy was kept ≤ 1.37 %, permanent hypoparathyroidism was ≤ 1.20 %, and/or postoperative radioiodine ablation use was ≤ 73.64 %. In the institution's perspective, routine pCND for low-risk PTC began to become cost-effective 9 years after initial surgery and became cost-saving at 20 years if postoperative radioiodine use and/or permanent surgical complications were kept to a minimum.
Dalley, C; Basarir, H; Wright, J G; Fernando, M; Pearson, D; Ward, S E; Thokula, P; Krishnankutty, A; Wilson, G; Dalton, A; Talley, P; Barnett, D; Hughes, D; Porter, N R; Reilly, J T; Snowden, J A
2015-04-01
Specialist Integrated Haematological Malignancy Diagnostic Services (SIHMDS) were introduced as a standard of care within the UK National Health Service to reduce diagnostic error and improve clinical outcomes. Two broad models of service delivery have become established: 'co-located' services operating from a single-site and 'networked' services, with geographically separated laboratories linked by common management and information systems. Detailed systematic cost analysis has never been published on any established SIHMDS model. We used Activity Based Costing (ABC) to construct a cost model for our regional 'networked' SIHMDS covering a two-million population based on activity in 2011. Overall estimated annual running costs were £1 056 260 per annum (£733 400 excluding consultant costs), with individual running costs for diagnosis, staging, disease monitoring and end of treatment assessment components of £723 138, £55 302, £184 152 and £94 134 per annum, respectively. The cost distribution by department was 28.5% for haematology, 29.5% for histopathology and 42% for genetics laboratories. Costs of the diagnostic pathways varied considerably; pathways for myelodysplastic syndromes and lymphoma were the most expensive and the pathways for essential thrombocythaemia and polycythaemia vera being the least. ABC analysis enables estimation of running costs of a SIHMDS model comprised of 'networked' laboratories. Similar cost analyses for other SIHMDS models covering varying populations are warranted to optimise quality and cost-effectiveness in delivery of modern haemato-oncology diagnostic services in the UK as well as internationally. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Oppong, Raymond; Nicholls, Elaine; Whitehurst, David G. T.; Hill, Susan; Hammond, Alison; Hay, Elaine M.; Dziedzic, Krysia
2015-01-01
Objectives. Evidence regarding the cost-effectiveness of joint protection and hand exercises for the management of hand OA is not well established. The primary aim of this study is to assess the cost-effectiveness (cost-utility) of these management options. In addition, given the absence of consensus regarding the conduct of economic evaluation alongside factorial trials, we compare different analytical methodologies. Methods. A trial-based economic evaluation to assess the cost-utility of joint protection only, hand exercises only and joint protection plus hand exercises compared with leaflet and advice was undertaken over a 12 month period from a UK National Health Service perspective. Patient-level mean costs and mean quality-adjusted life years (QALYs) were calculated for each trial arm. Incremental cost-effectiveness ratios (ICERs) were estimated and cost-effectiveness acceptability curves were constructed. The base case analysis used a within-the-table analysis methodology. Two further methods were explored: the at-the-margins approach and a regression-based approach with or without an interaction term. Results. Mean costs (QALYs) were £58.46 (s.d. 0.662) for leaflet and advice, £92.12 (s.d. 0.659) for joint protection, £64.51 (s.d. 0.681) for hand exercises and £112.38 (s.d. 0.658) for joint protection plus hand exercises. In the base case, hand exercises were the cost-effective option, with an ICER of £318 per QALY gained. Hand exercises remained the most cost-effective management strategy when adopting alternative methodological approaches. Conclusion. This is the first trial evaluating the cost-effectiveness of occupational therapy-supported approaches to self-management for hand OA. Our findings showed that hand exercises were the most cost-effective option. PMID:25339642
Jain, Vivek; Chang, Wei; Byonanebye, Dathan M; Owaraganise, Asiphas; Twinomuhwezi, Ellon; Amanyire, Gideon; Black, Douglas; Marseille, Elliot; Kamya, Moses R; Havlir, Diane V; Kahn, James G
2015-01-01
Evidence favoring earlier HIV ART initiation at high CD4+ T-cell counts (CD4>350/uL) has grown, and guidelines now recommend earlier HIV treatment. However, the cost of providing ART to individuals with CD4>350 in Sub-Saharan Africa has not been well estimated. This remains a major barrier to optimal global cost projections for accelerating the scale-up of ART. Our objective was to compute costs of ART delivery to high CD4+count individuals in a typical rural Ugandan health center-based HIV clinic, and use these data to construct scenarios of efficient ART scale-up. Within a clinical study evaluating streamlined ART delivery to 197 individuals with CD4+ cell counts >350 cells/uL (EARLI Study: NCT01479634) in Mbarara, Uganda, we performed a micro-costing analysis of administrative records, ART prices, and time-and-motion analysis of staff work patterns. We computed observed per-person-per-year (ppy) costs, and constructed models estimating costs under several increasingly efficient ART scale-up scenarios using local salaries, lowest drug prices, optimized patient loads, and inclusion of viral load (VL) testing. Among 197 individuals enrolled in the EARLI Study, median pre-ART CD4+ cell count was 569/uL (IQR 451-716). Observed ART delivery cost was $628 ppy at steady state. Models using local salaries and only core laboratory tests estimated costs of $529/$445 ppy (+/-VL testing, respectively). Models with lower salaries, lowest ART prices, and optimized healthcare worker schedules reduced costs by $100-200 ppy. Costs in a maximally efficient scale-up model were $320/$236 ppy (+/- VL testing). This included $39 for personnel, $106 for ART, $130/$46 for laboratory tests, and $46 for administrative/other costs. A key limitation of this study is its derivation and extrapolation of costs from one large rural treatment program of high CD4+ count individuals. In a Ugandan HIV clinic, ART delivery costs--including VL testing--for individuals with CD4>350 were similar to estimates from high-efficiency programs. In higher efficiency scale-up models, costs were substantially lower. These favorable costs may be achieved because high CD4+ count patients are often asymptomatic, facilitating more efficient streamlined ART delivery. Our work provides a framework for calculating costs of efficient ART scale-up models using accessible data from specific programs and regions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Im, Piljae; Liu, Xiaobing
High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. Themore » RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.« less
Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stebbins, P.E.
1993-09-01
The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changesmore » in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.« less
Construction of a low-cost luximeter
NASA Astrophysics Data System (ADS)
Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.
2016-04-01
This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Recommended conceptual optical system design for China's Large Optical-infrared Telescope (LOT).
Ma, Donglin
2018-01-08
Recently, China is planning to construct a new large optical-infrared telescope (LOT), in which the aperture of the primary mirror is as large as 12m. China's LOT is a general-purpose telescope, which is aimed to work with multiple scientific instruments such as spectrographs. Based on the requirements of LOT telescope, we have compared the performance of Ritchey-Chrétien (RC) design and Aplanatic-Gregorian (AG) design from the perspective of scientific performance and construction cost. By taking the primary focal ratio, Nasmyth focal ratio, and telescope's site condition into consideration, we finally recommend a RC f/1.6 design configuration for LOT's Nasmyth telescope system. Unlike the general identical configuration, we choose a non-identical configuration for the telescope system which has a shorter Cassegrain focal ratio compared to the designed Nasmyth focal ratio. The non-identical design can allow for a shorter back focal distance and therefore a shorter telescope fork to guarantee the gravitational stability of the whole telescope structure, as well as relatively lower construction cost. Detailed analysis for the feasibility of our recommended design is provided in this paper.
Analysis of the Seismic Performance of Isolated Buildings according to Life-Cycle Cost
Dang, Yu; Han, Jian-ping; Li, Yong-tao
2015-01-01
This paper proposes an indicator of seismic performance based on life-cycle cost of a building. It is expressed as a ratio of lifetime damage loss to life-cycle cost and determines the seismic performance of isolated buildings. Major factors are considered, including uncertainty in hazard demand and structural capacity, initial costs, and expected loss during earthquakes. Thus, a high indicator value indicates poor building seismic performance. Moreover, random vibration analysis is conducted to measure structural reliability and evaluate the expected loss and life-cycle cost of isolated buildings. The expected loss of an actual, seven-story isolated hospital building is only 37% of that of a fixed-base building. Furthermore, the indicator of the structural seismic performance of the isolated building is much lower in value than that of the structural seismic performance of the fixed-base building. Therefore, isolated buildings are safer and less risky than fixed-base buildings. The indicator based on life-cycle cost assists owners and engineers in making investment decisions in consideration of structural design, construction, and expected loss. It also helps optimize the balance between building reliability and building investment. PMID:25653677
Analysis of the seismic performance of isolated buildings according to life-cycle cost.
Dang, Yu; Han, Jian-Ping; Li, Yong-Tao
2015-01-01
This paper proposes an indicator of seismic performance based on life-cycle cost of a building. It is expressed as a ratio of lifetime damage loss to life-cycle cost and determines the seismic performance of isolated buildings. Major factors are considered, including uncertainty in hazard demand and structural capacity, initial costs, and expected loss during earthquakes. Thus, a high indicator value indicates poor building seismic performance. Moreover, random vibration analysis is conducted to measure structural reliability and evaluate the expected loss and life-cycle cost of isolated buildings. The expected loss of an actual, seven-story isolated hospital building is only 37% of that of a fixed-base building. Furthermore, the indicator of the structural seismic performance of the isolated building is much lower in value than that of the structural seismic performance of the fixed-base building. Therefore, isolated buildings are safer and less risky than fixed-base buildings. The indicator based on life-cycle cost assists owners and engineers in making investment decisions in consideration of structural design, construction, and expected loss. It also helps optimize the balance between building reliability and building investment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Green Energy in New Construction: Maximize Energy Savings and Minimize Cost
ERIC Educational Resources Information Center
Ventresca, Joseph
2010-01-01
People often use the term "green energy" to refer to alternative energy technologies. But green energy doesn't guarantee maximum energy savings at a minimum cost--a common misconception. For school business officials, green energy means getting the lowest energy bills for the lowest construction cost, which translates into maximizing green energy…
Mei, Chao; Liu, Jiahong; Wang, Hao; Yang, Zhiyong; Ding, Xiangyi; Shao, Weiwei
2018-10-15
Green Infrastructure (GI) has become increasingly important in urban stormwater management because of the effects of climate change and urbanization. To mitigate severe urban water-related problems, China is implementing GI at the national scale under its Sponge City Program (SCP). The SCP is currently in a pilot period, however, little attention has been paid to the cost-effectiveness of GI implementation in China. In this study, an evaluation framework based on the Storm Water Management Model (SWMM) and life cycle cost analysis (LCCA) was applied to undertake integrated assessments of the development of GI for flood mitigation, to support robust decision making regarding sponge city construction in urbanized watersheds. A baseline scenario and 15 GI scenarios under six design rainfall events with recurrence intervals ranging from 2-100 years were simulated and assessed. Model simulation results confirmed the effectiveness of GI for flood mitigation. Nevertheless, even under the most beneficial scenario, the results showed the hydrological performance of GI was incapable of eliminating flooding. Analysis indicated the bioretention cell (BC) plus vegetated swale (VS) scenario was the most cost-effective GI option for unit investment under all rainfall events. However, regarding the maximum potential of the implementation areas of all GI scenarios, the porous pavement plus BC + VS strategy was considered most reasonable for the study area. Although the optimal combinations are influenced by uncertainties in both the model and the GI parameters, the main trends and key insights derived remain unaffected; therefore, the conclusions are relevant regarding sponge city construction within the study area. Copyright © 2018 Elsevier B.V. All rights reserved.
Newman Unit 1 advanced solar repowering advanced conceptual design. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-04-01
The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less
Equilibria of an epidemic game with piecewise linear social distancing cost.
Reluga, Timothy C
2013-10-01
Around the world, infectious disease epidemics continue to threaten people's health. When epidemics strike, we often respond by changing our behaviors to reduce our risk of infection. This response is sometimes called "social distancing." Since behavior changes can be costly, we would like to know the optimal social distancing behavior. But the benefits of changes in behavior depend on the course of the epidemic, which itself depends on our behaviors. Differential population game theory provides a method for resolving this circular dependence. Here, I present the analysis of a special case of the differential SIR epidemic population game with social distancing when the relative infection rate is linear, but bounded below by zero. Equilibrium solutions are constructed in closed-form for an open-ended epidemic. Constructions are also provided for epidemics that are stopped by the deployment of a vaccination that becomes available a fixed-time after the start of the epidemic. This can be used to anticipate a window of opportunity during which mass vaccination can significantly reduce the cost of an epidemic.
Acevedo, Joseph R; Fero, Katherine E; Wilson, Bayard; Sacco, Assuntina G; Mell, Loren K; Coffey, Charles S; Murphy, James D
2016-11-10
Purpose Recently, a large randomized trial found a survival advantage among patients who received elective neck dissection in conjunction with primary surgery for clinically node-negative oral cavity cancer compared with those receiving primary surgery alone. However, elective neck dissection comes with greater upfront cost and patient morbidity. We present a cost-effectiveness analysis of elective neck dissection for the initial surgical management of early-stage oral cavity cancer. Methods We constructed a Markov model to simulate primary, adjuvant, and salvage therapy; disease recurrence; and survival in patients with T1/T2 clinically node-negative oral cavity squamous cell carcinoma. Transition probabilities were derived from clinical trial data; costs (in 2015 US dollars) and health utilities were estimated from the literature. Incremental cost-effectiveness ratios, expressed as dollar per quality-adjusted life-year (QALY), were calculated with incremental cost-effectiveness ratios less than $100,000/QALY considered cost effective. We conducted one-way and probabilistic sensitivity analyses to examine model uncertainty. Results Our base-case model found that over a lifetime the addition of elective neck dissection to primary surgery reduced overall costs by $6,000 and improved effectiveness by 0.42 QALYs compared with primary surgery alone. The decrease in overall cost despite the added neck dissection was a result of less use of salvage therapy. On one-way sensitivity analysis, the model was most sensitive to assumptions about disease recurrence, survival, and the health utility reduction from a neck dissection. Probabilistic sensitivity analysis found that treatment with elective neck dissection was cost effective 76% of the time at a willingness-to-pay threshold of $100,000/QALY. Conclusion Our study found that the addition of elective neck dissection reduces costs and improves health outcomes, making this a cost-effective treatment strategy for patients with early-stage oral cavity cancer.
Scale Matters: A Cost-Outcome Analysis of an m-Health Intervention in Malawi.
Larsen-Cooper, Erin; Bancroft, Emily; Rajagopal, Sharanya; O'Toole, Maggie; Levin, Ann
2016-04-01
The primary objectives of this study are to determine cost per user and cost per contact with users of a mobile health (m-health) intervention. The secondary objectives are to map costs to changes in maternal, newborn, and child health (MNCH) and to estimate costs of alternate implementation and usage scenarios. A base cost model, constructed from recurrent costs and selected capital costs, was used to estimate average cost per user and per contact of an m-health intervention. This model was mapped to statistically significant changes in MNCH intermediate outcomes to determine the cost of improvements in MNCH indicators. Sensitivity analyses were conducted to estimate costs in alternate scenarios. The m-health intervention cost $29.33 per user and $4.33 per successful contact. The average cost for each user experiencing a change in an MNCH indicator ranged from $67 to $355. The sensitivity analyses showed that cost per user could be reduced by 48% if the service were to operate at full capacity. We believe that the intervention, operating at scale, has potential to be a cost-effective method for improving maternal and child health indicators.
Scale Matters: A Cost-Outcome Analysis of an m-Health Intervention in Malawi
Bancroft, Emily; Rajagopal, Sharanya; O'Toole, Maggie; Levin, Ann
2016-01-01
Abstract Background: The primary objectives of this study are to determine cost per user and cost per contact with users of a mobile health (m-health) intervention. The secondary objectives are to map costs to changes in maternal, newborn, and child health (MNCH) and to estimate costs of alternate implementation and usage scenarios. Materials and Methods: A base cost model, constructed from recurrent costs and selected capital costs, was used to estimate average cost per user and per contact of an m-health intervention. This model was mapped to statistically significant changes in MNCH intermediate outcomes to determine the cost of improvements in MNCH indicators. Sensitivity analyses were conducted to estimate costs in alternate scenarios. Results: The m-health intervention cost $29.33 per user and $4.33 per successful contact. The average cost for each user experiencing a change in an MNCH indicator ranged from $67 to $355. The sensitivity analyses showed that cost per user could be reduced by 48% if the service were to operate at full capacity. Conclusions: We believe that the intervention, operating at scale, has potential to be a cost-effective method for improving maternal and child health indicators. PMID:26348994
Jain, Vivek; Chang, Wei; Byonanebye, Dathan M.; Owaraganise, Asiphas; Twinomuhwezi, Ellon; Amanyire, Gideon; Black, Douglas; Marseille, Elliot; Kamya, Moses R.; Havlir, Diane V.; Kahn, James G.
2015-01-01
Background Evidence favoring earlier HIV ART initiation at high CD4+ T-cell counts (CD4>350/uL) has grown, and guidelines now recommend earlier HIV treatment. However, the cost of providing ART to individuals with CD4>350 in Sub-Saharan Africa has not been well estimated. This remains a major barrier to optimal global cost projections for accelerating the scale-up of ART. Our objective was to compute costs of ART delivery to high CD4+count individuals in a typical rural Ugandan health center-based HIV clinic, and use these data to construct scenarios of efficient ART scale-up. Methods Within a clinical study evaluating streamlined ART delivery to 197 individuals with CD4+ cell counts >350 cells/uL (EARLI Study: NCT01479634) in Mbarara, Uganda, we performed a micro-costing analysis of administrative records, ART prices, and time-and-motion analysis of staff work patterns. We computed observed per-person-per-year (ppy) costs, and constructed models estimating costs under several increasingly efficient ART scale-up scenarios using local salaries, lowest drug prices, optimized patient loads, and inclusion of viral load (VL) testing. Findings Among 197 individuals enrolled in the EARLI Study, median pre-ART CD4+ cell count was 569/uL (IQR 451–716). Observed ART delivery cost was $628 ppy at steady state. Models using local salaries and only core laboratory tests estimated costs of $529/$445 ppy (+/-VL testing, respectively). Models with lower salaries, lowest ART prices, and optimized healthcare worker schedules reduced costs by $100–200 ppy. Costs in a maximally efficient scale-up model were $320/$236 ppy (+/- VL testing). This included $39 for personnel, $106 for ART, $130/$46 for laboratory tests, and $46 for administrative/other costs. A key limitation of this study is its derivation and extrapolation of costs from one large rural treatment program of high CD4+ count individuals. Conclusions In a Ugandan HIV clinic, ART delivery costs—including VL testing—for individuals with CD4>350 were similar to estimates from high-efficiency programs. In higher efficiency scale-up models, costs were substantially lower. These favorable costs may be achieved because high CD4+ count patients are often asymptomatic, facilitating more efficient streamlined ART delivery. Our work provides a framework for calculating costs of efficient ART scale-up models using accessible data from specific programs and regions. PMID:26632823
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Cost-effectiveness acceptability curves revisited.
Al, Maiwenn J
2013-02-01
Since the introduction of the cost-effectiveness acceptability curve (CEAC) in 1994, its use as a method to describe uncertainty around incremental cost-effectiveness ratios (ICERs) has steadily increased. In this paper, first the construction and interpretation of the CEAC is explained, both in the context of modelling studies and in the context of cost-effectiveness (CE) studies alongside clinical trials. Additionally, this paper reviews the advantages and limitations of the CEAC. Many of the perceived limitations can be attributed to the practice of interpreting the CEAC as a decision rule while it was not developed as such. It is argued that the CEAC is still a useful tool in describing and quantifying uncertainty around the ICER, especially in combination with other tools such as plots on the CE plane and value-of-information analysis.
Investing in health: is social housing value for money? A cost-utility analysis.
Lawson, K D; Kearns, A; Petticrew, M; Fenwick, E A L
2013-10-01
There is a healthy public policy agenda investigating the health impacts of improving living conditions. However, there are few economic evaluations, to date, assessing value for money. We conducted the first cost-effectiveness analysis of a nationwide intervention transferring social and private tenants to new-build social housing, in Scotland. A quasi-experimental prospective study was undertaken involving 205 intervention households and 246 comparison households, over 2 years. A cost-utility analysis assessed the average cost per change in health utility (a single score summarising overall health-related quality of life), generated via the SF-6D algorithm. Construction costs for new builds were included. Analysis was conducted for all households, and by family, adult and elderly households; with estimates adjusted for baseline confounders. Outcomes were annuitised and discounted at 3.5%. The average discounted cost was £18, 708 per household, at a national programme cost of £ 28.4 million. The average change in health utility scores in the intervention group attributable to the intervention were +0.001 for all households, +0.001 for family households, -0.04 for adult households and -0.03 for elderly households. All estimates were statistically insignificant. At face value, the interventions were not value for money in health terms. However, because the policy rationale was the amenity provision of housing for disadvantaged groups, impacts extend beyond health and may be fully realised over the long term. Before making general value-for-money inferences, economic evaluation should attempt to estimate the full social value of interventions, model long-term impacts and explicitly incorporate equity considerations.
Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.
Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V
2017-03-01
Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
Should radon be reduced in homes? A cost-effect analysis.
Stigum, Hein; Strand, Terje; Magnus, Per
2003-02-01
Radon is a radioactive gas that may leak into buildings from the ground. Radon exposure is a risk factor for lung cancer. An intervention against radon exposure in homes may consist of locating homes with high radon exposure (above 200 Bq m(-3)) and improving these, and protecting future houses. The purpose of this paper is to calculate the costs and the effects of this intervention. We performed a cost-effect analysis from the perspective of the society, followed by an uncertainty and sensitivity analysis. The distribution of radon levels in Norwegian homes is lognormal with mean = 74.5 Bq m(-3), and 7.6% above 200 Bq m(-3). The preventable attributable fraction of radon on lung cancer was 3.8% (95% uncertainty interval: 0.6%, 8.3%). In cumulative present values the intervention would cost $238 (145, 310) million and save 892 (133, 1981) lives; each life saved costs $0.27 (0.09, 0.9) million. The cost-effect ratio was sensitive to the radon risk, the radon exposure distribution, and the latency period of lung cancer. Together these three parameters explained 90% of the variation in the cost-effect ratio. The uncertainty in the estimated cost per life is large, mainly due to uncertainty in the risk of lung cancer from radon. Based on estimates from road construction, the Norwegian society has been willing to pay $1 million to save a life. This is above the upper uncertainty limit of the cost per life. The intervention against radon in homes, therefore, seems justifiable.
Cost-effectiveness analysis of treatment alternatives for beef bulls with preputial prolapse.
Kasari, T R; McGrann, J M; Hooper, R N
1997-10-01
To develop an economic model for comparing cost-effectiveness of medical and surgical treatment versus replacement of beef bulls with preputial prolapse. Economic analysis. Estimates determined from medical records of bulls treated for preputial prolapse at our hospital and from information about treatment of bulls published elsewhere. Annual depreciation cost for treatment (ADC(T)) and replacement (ADC(R)) were calculated. Total investment for an injured bull equaled the sum of salvage value, maintenance cost, and expected cost of the treatment option under consideration. Total investment for a replacement bull was purchase price. Net present value of cost was calculated for each year of bull use. Sensitivity analyses were constructed to determine the value that would warrant treatment of an injured bull. The decision to treat was indicated when ADC(T) was less than ADC(R). In our example, it was more cost-effective for owners to cull an injured bull. The ADC(R) was $97 less than ADC(T) for medical treatment ($365 vs $462) and $280 less than ADC(T) for surgical treatment ($365 vs $645). Likewise, net present value of cost values indicated that it was more cost-effective for owners to cull an injured bull. Sensitivity analysis indicated treatment decisions were justified on the basis of replacement value or planned number of breeding seasons remaining for the bull. The model described here can be used by practitioners to provide an objective basis to guide decision making of owners who seek advice on whether to treat or replace bulls with preputial prolapse.
Mould-Quevedo, Joaquín; Contreras-Hernández, Iris; Verduzco, Wáscar; Mejía-Aranguré, Juan Manuel; Garduño-Espinosa, Juan
2009-07-01
Estimation of the economic costs of schizophrenia is a fundamental tool for a better understanding of the magnitude of this health problem. The aim of this study was to estimate the costs and effectiveness of five antipsychotic treatments (ziprasidone, olanzapine, risperidone, haloperidol and clozapine), which are included in the national formulary at the Instituto Mexicano del Seguro Social, through a simulation model. Type of economic evaluation: complete economic evaluation of cost-effectiveness. direct medical costs. 1 year. Effectiveness measure: number of months free of psychotic symptoms. to estimate cost-effectiveness, a Markov model was constructed and a Monte Carlo simulation was carried out. Effectiveness: the results of the Markov model showed that the antipsychotic with the highest number months free of psychotic symptoms was ziprasidone (mean 9.2 months). The median annual costs for patients using ziprasidone included in the hypothetical cohort was 194,766.6 Mexican pesos (MXP) (95% CI, 26,515.6-363,017.6 MXP), with an exchange rate of 1 € = 17.36 MXP. The highest costs in the probabilistic analysis were estimated for clozapine treatment (260,236.9 MXP). Through a probabilistic analysis, ziprasidone showed the lowest costs and the highest number of months free of psychotic symptoms and was also the most costeffective antipsychotic observed in acceptability curves and net monetary benefits. Copyright © 2009 Sociedad Española de Psiquiatría and Sociedad Española de Psiquiatría Biológica. Published by Elsevier Espana. All rights reserved.
Mejía, Aurelio; Senior, Juan Manuel; Ceballos, Mateo; Atehortúa, Sara; Toro, Juan Manuel; Saldarriaga, Clara; Mejía, María Elena; Ramírez, Carolina
2015-01-01
Acute coronary syndrome is one of the most frequent medical emergencies in developing countries. To determine, from the perspective of the Colombian health system, the cost-effectiveness of ticagrelor compared to clopidogrel for the treatment of patients with acute coronary syndrome. We conducted a cost-effectiveness analysis from the perspective of the Colombian health system comparing ticagrelor and clopidogrel for the treatment of patients with acute coronary syndrome. To estimate the expected costs and outcomes, a Markov model was constructed in which patients could remain stable without experiencing new cardiovascular events, suffer from a new event, or die. For the baseline case, a 10-year time horizon and a discount ratio of 3% for costs and benefits were adopted. The transition probabilities were extracted from the PLATO (Platelet Inhibition and Patient Outcomes) clinical trial. Vital statistics were drawn from the Departmento Administrativo Nacional de Estadística (DANE) and additional information from Colombian patients included in the Access registry. To identify and measure resource use, a standard case was built by consulting guidelines and protocols. Unit costs were obtained from Colombian rate lists. A probabilistic sensitivity analysis was conducted in which costs were represented by a triangular distribution, and the effectiveness through a beta distribution. In the base case, the additional cost per quality-adjusted life-year gained with ticagrelor was COP$ 28,411,503. The results were sensitive to changes in the time horizon and the unit cost of clopidogrel. For a willingness-to-pay equivalent to three times the Colombian per capita gross domestic product, the probability of ticagrelor being cost-effective was 75%. Ticagrelor is a cost-effective strategy for the treatment of patients with acute coronary syndrome in Colombia.
When does it pay to invest in a patch? The evolution of intentional niche construction.
Mohlenhoff, Kathryn A; Codding, Brian F
2017-09-01
Humans modify their environments in ways that significantly transform the earth's ecosystems. Recent research suggests that such niche-constructing behaviors are not passive human responses to environmental variation, but instead should be seen as active and intentional management of the environment. Although such research is useful in highlighting the interactive dynamics between humans and their natural world, the niche-construction framework, as currently applied, fails to explain why people would decide to modify their environments in the first place. To help resolve this problem, we use a model of technological intensification to analyze the cost-benefit trade-offs associated with niche construction as a form of patch investment. We use this model to assess the costs and benefits of three paradigmatic cases of intentional niche construction in Western North America: the application of fire in acorn groves, the manufacture of fishing weirs, and the adoption of maize agriculture. Intensification models predict that investing in patch modification (niche construction) only provides a net benefit when the amount of resources needed crosses a critical threshold that makes the initial investment worthwhile. From this, it follows that low-cost investments, such as burning in oak groves, should be quite common, while more costly investments, such as maize agriculture, should be less common and depend on the alternatives available in the local environment. We examine how patterns of mobility, risk management, territoriality, and private property also co-evolve with the costs and benefits of niche construction. This approach illustrates that explaining niche-constructing behavior requires understanding the economic trade-offs involved in patch investment. Integrating concepts from niche construction and technological intensification models within a behavioral ecological framework provides insights into the coevolution and active feedback between adaptive behaviors and environmental change across human history. © 2017 Wiley Periodicals, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lozano, M.C.; Chalfoun, N.V.
Bogota, Colombia, is the third highest capital in South America, its location near the equator assures high altitudes over the horizon and almost 5 hours of daily mean sunshine. Since 1981, efforts for using natural energy instead of nonrenewable fuel have been targeted to Colombia`s residential construction industry. This paper focuses on a computer aided design process for passive solar low-income row housing in Bogota. Thermal comfort for this tropical climate has been achieved through employing ``Guadua,`` a strong bamboo specie,as an alternative wall system to the traditional brick, adobe, or concrete structures. Through computer analysis, several energy conservation andmore » passive solar strategies have been optimized for a case study row housing type common to the region. The load savings compared to a 6 inch CMU house totaled 72%, while the operating cost has been reduced by 71%. Furthermore, this lightweight and inexpensive ``Guadua`` material has reduced the construction cost by 30%.« less
Feasibility Investigation for a Solar Power Generation Facility
NASA Technical Reports Server (NTRS)
Nathan, Lakshmi
2010-01-01
The Energy Policy Act of 2005 states that by fiscal year 2013, at least 7.5% of the energy consumed by the government must be renewable energy. In an effort to help meet this goal, Johnson Space Center (JSC) is considering installing a solar power generation facility. The purpose of this project is to conduct a feasibility investigation for such a facility. Because Kennedy Space Center (KSC) has a solar power generation facility, the first step in this investigation is to learn about KSC's facility and obtain information on how it was constructed. After collecting this information, the following must be determined: the amount of power desired, the size of the facility, potential locations for it, and estimated construction and maintenance costs. Contacts with JSC's energy provider must also be established to determine if a partnership would be agreeable to both parties. Lastly, all of this data must be analyzed to decide whether or not JSC should construct the facility. The results from analyzing the data collected indicate that a 200 kW facility would provide enough energy to meet 1% of JSC's energy demand. This facility would require less than 1 acre of land. In the map below, potential locations are shown in green. The solar power facility is projected to cost $2 M. So far, the information collected indicates that such a facility could be constructed. The next steps in this investigation include contacting JSC's energy provider, CenterPoint Energy, to discuss entering a partnership; developing a life cycle cost analysis to determine payback time; developing more detailed plans; and securing funding.
Economic Conditions and Factors Affecting New Nuclear Power Deployment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison, Thomas J.
2014-10-01
This report documents work performed in support of the US Department of Energy Office of Nuclear Energy’s Advanced Small Modular Reactor (AdvSMR) program. The report presents information and results from economic analyses to describe current electricity market conditions and those key factors that may impact the deployment of AdvSMRs or any other new nuclear power plants. Thus, this report serves as a reference document for DOE as it moves forward with its plans to develop advanced reactors, including AdvSMRs. For the purpose of this analysis, information on electricity markets and nuclear power plant operating costs will be combined to examinemore » the current state of the nuclear industry and the process required to successfully move forward with new nuclear power in general and AdvSMRs in particular. The current electricity market is generally unfavorable to new nuclear construction, especially in deregulated markets with heavy competition from natural gas and subsidized renewables. The successful and profitable operation of a nuclear power plant (or any power plant) requires the rate at which the electricity is sold to be sufficiently greater than the cost to operate. The wholesale rates in most US markets have settled into values that provide profits for most operating nuclear power plants but are too low to support the added cost of capital recovery for new nuclear construction. There is a strong geographic dependence on the wholesale rate, with some markets currently able to support new nuclear construction. However, there is also a strong geographic dependence on pronuclear public opinion; the areas where power prices are high tend to have unfavorable views on the construction of new nuclear power plants. The use of government-backed incentives, such as subsidies, can help provide a margin to help justify construction projects that otherwise may not seem viable. Similarly, low interest rates for the project will also add a positive margin to the economic analysis. In both cases, the profitable price point is decreased, making more markets open to profitable entry. Overall, the economic attractiveness of a nuclear power construction project is not only a function of its own costs, but a function of the market into which it is deployed. Many of the market characteristics are out of the control of the potential nuclear power plant operators. The decision-making process for the power industry in general is complicated by the short-term market volatility in both the wholesale electricity market and the commodity (natural gas) market. Decisions based on market conditions today may be rendered null and void in six months. With a multiple-year lead time, nuclear power plants are acutely vulnerable to market corrections.« less
Freedom space for rivers: An economically viable river management concept in a changing climate
NASA Astrophysics Data System (ADS)
Buffin-Bélanger, Thomas; Biron, Pascale M.; Larocque, Marie; Demers, Sylvio; Olsen, Taylor; Choné, Guénolé; Ouellet, Marie-Audray; Cloutier, Claude-André; Desjarlais, Claude; Eyquem, Joanna
2015-12-01
The freedom space concept applies hydrogeomorphic principles to delineate zones that are either frequently flooded or actively eroding, or that include riparian wetlands. Freedom space limits mapped for three rivers in southern Quebec (Canada) were assessed to determine whether they would still be valid under a future climate using a sensitivity analysis approach with numerical models predicting mobility of meanders (RVRMeander) and flood stage (HEC-RAS). The freedom space limits were also used in a cost-benefit analysis over a 50-year period where costs consist of loss or limitations to the right of farming and construction in this zone, whereas benefits are avoided costs for existing or future bank stabilization structures and avoided costs of flooding in agricultural areas. The economic value of ecosystem services provided by riparian wetlands and increased buffer zones within the freedom space were also included in the analysis. Results show that freedom space limits would be robust in future climate, and show net present values ranging from CDN0.7 to 3.7 million for the three rivers, with ratios of benefits over costs ranging between 1.5:1 and 4.8:1. River management based on freedom space is thus beneficial for society over a 50-year period.
The Impact of State Regulations on the Costs of Public School Construction
ERIC Educational Resources Information Center
Vincent, Jeffrey M.; Monkkonen, Paavo
2010-01-01
Spending by states and local school districts on school construction has increased dramatically over the last decade, not only because more and higher-quality schools are being built, but also because construction costs have increased by an unprecedented degree. Many states struggle to afford the new schools needed in local communities. The…
Construction of dynamic stochastic simulation models using knowledge-based techniques
NASA Technical Reports Server (NTRS)
Williams, M. Douglas; Shiva, Sajjan G.
1990-01-01
Over the past three decades, computer-based simulation models have proven themselves to be cost-effective alternatives to the more structured deterministic methods of systems analysis. During this time, many techniques, tools and languages for constructing computer-based simulation models have been developed. More recently, advances in knowledge-based system technology have led many researchers to note the similarities between knowledge-based programming and simulation technologies and to investigate the potential application of knowledge-based programming techniques to simulation modeling. The integration of conventional simulation techniques with knowledge-based programming techniques is discussed to provide a development environment for constructing knowledge-based simulation models. A comparison of the techniques used in the construction of dynamic stochastic simulation models and those used in the construction of knowledge-based systems provides the requirements for the environment. This leads to the design and implementation of a knowledge-based simulation development environment. These techniques were used in the construction of several knowledge-based simulation models including the Advanced Launch System Model (ALSYM).
Bashir, Jamil; Cowan, Simone; Raymakers, Adam; Yamashita, Michael; Danter, Matthew; Krahn, Andrew; Lynd, Larry D
2013-12-01
The management of the recall is complicated by the competing risks of lead failure and complications that can occur with lead revision. Many of these patients are currently undergoing an elective generator change--an ideal time to consider lead revision. To determine the cost-effectiveness of a proactive management strategy for the Sprint Fidelis recall. We obtained detailed clinical outcomes and costing data from a retrospective analysis of 341 patients who received the Sprint Fidelis lead in British Columbia, where patients younger than 60 years were offered lead extraction when undergoing generator replacement. These population-based data were used to construct and populate a probabilistic Markov model in which a proactive management strategy was compared to a conservative strategy to determine the incremental cost per lead failure avoided. In our population, elective lead revisions were half the cost of emergent revisions and had a lower complication rate. In the model, the incremental cost-effectiveness ratio of proactive lead revision versus a recommended monitoring strategy was $12,779 per lead failure avoided. The proactive strategy resulted in 21 fewer failures per 100 patients treated and reduced the chance of an additional complication from an unexpected surgery. Cost-effectiveness analysis suggests that prospective lead revision should be considered when patients with a Sprint Fidelis lead present for pulse generator change. Elective revision of the lead is justified even when 25% of the population is operated on per year, and in some scenarios, it is both less costly and provides a better outcome. © 2013 Heart Rhythm Society Published by Heart Rhythm Society All rights reserved.
Cavatte, Paulo C; Rodríguez-López, Nélson F; Martins, Samuel C V; Mattos, Mariela S; Sanglard, Lílian M V P; Damatta, Fábio M
2012-05-01
In this study, the combined effects of light and water availability on the functional relationships of the relative growth rate (RGR), leaf chemical composition, construction and maintenance costs, and benefits in terms of payback time for Coffea arabica are presented. Coffee plants were grown for 8 months in 100% or 15% full sunlight and then a four-month water shortage was implemented. Plants grown under full sunlight were also transferred to shade and vice versa. Overall, most of the traits assessed were much more responsive to the availability of light than to the water supply. Larger construction costs (12%), primarily associated with elevated phenol and alkaloid pools, were found under full sunlight. There was a positive correlation between these compounds and the RGR, the mass-based net carbon assimilation rate and the carbon isotope composition ratio, which, in turn, correlated negatively with the specific leaf area. The payback time was remarkably lower in the sun than in shade leaves and increased greatly in water-deprived plants. The differences in maintenance costs among the treatments were narrow, with no significant impact on the RGR, and there was no apparent trade-off in resource allocation between growth and defence. The current irradiance during leaf bud formation affected both the specific leaf area and leaf physiology upon transferring the plants from low to high light and vice versa. In summary, sun-grown plants fixed more carbon for growth and secondary metabolism, with the net effect of an increased RGR.
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
36 CFR 223.111 - Administration of contracts in designated disaster areas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... road or facility, the United States shall bear such increased construction cost if, as determined by... damages are so great that restoration, reconstruction, or construction is not practical under the cost...
Construction engineering inspection direct cost survey.
DOT National Transportation Integrated Search
2014-07-01
The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
Cost Analysis of Establishing a Relationship Between a Surgical Program in the US and Vietnam
Chu, Quyen D.; Nguyen, Thu; Nguyen, Phuong; Ho, Hung S.
2012-01-01
“Twinning” refers to a constructive partnership between hospitals in developed and developing nations. Such an effort may contribute immensely to capacity building for the developing nation, but one of the reasons given for the lack of sustainability is cost. We share a detailed operating cost analysis of our recent experience with an institution in Vietnam. We were awarded a 1-year $54,000 grant from the Vietnam Education Foundation (VEF) to conduct a live tele-video conferencing course on the “Fundamentals of Clinical Surgery” with Thai Binh Medical University (TBMU). In-country lectures as well as an assessment of the needs at TBMU were performed. Total financial assistance and expenditures were tabulated to assess up-front infrastructure investment and annual cost required to sustain the program. The total amount of direct money ($66,686) and in-kind services ($70,276) was $136,962. The initial infrastructure cost was $41,085, which represented 62% of the direct money received. The annual cost to sustain the program was approximately $11,948. We concluded that the annual cost to maintain a “twinning” program was relatively low, and the efforts to sustain a “twinning” program were financially feasible and worthwhile endeavors. “Twinning” should be a critical part of the surgical humanitarian volunteerism effort. PMID:23102082
Cost analysis of establishing a relationship between a surgical program in the US and Vietnam.
Chu, Quyen D; Nguyen, Thu; Nguyen, Phuong; Ho, Hung S
2012-01-01
"Twinning" refers to a constructive partnership between hospitals in developed and developing nations. Such an effort may contribute immensely to capacity building for the developing nation, but one of the reasons given for the lack of sustainability is cost. We share a detailed operating cost analysis of our recent experience with an institution in Vietnam. We were awarded a 1-year $54,000 grant from the Vietnam Education Foundation (VEF) to conduct a live tele-video conferencing course on the "Fundamentals of Clinical Surgery" with Thai Binh Medical University (TBMU). In-country lectures as well as an assessment of the needs at TBMU were performed. Total financial assistance and expenditures were tabulated to assess up-front infrastructure investment and annual cost required to sustain the program. The total amount of direct money ($66,686) and in-kind services ($70,276) was $136,962. The initial infrastructure cost was $41,085, which represented 62% of the direct money received. The annual cost to sustain the program was approximately $11,948. We concluded that the annual cost to maintain a "twinning" program was relatively low, and the efforts to sustain a "twinning" program were financially feasible and worthwhile endeavors. "Twinning" should be a critical part of the surgical humanitarian volunteerism effort.
Higher mortgages, lower energy bills: The real economics of buying an energy-efficient home
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, E.
1987-02-01
To measure the actual costs and benefits of buying an energy- efficient home, it is necessary to employ a cash-flow model that accounts for mortgage interest and other charges associated with the incremental costs of conservation measures. The ability to make payments gradually over the term of a mortgage, energy savings, and tax benefits contribute to increased cost effectiveness. Conversely, financial benefits are reduced by interest payments, insurance, taxes, and various fees linked to the (higher) sale price of an energy-efficient home. Accounting for these factors can yield a strikingly different picture from those given by commonly used ''engineering'' indicators,more » such as simple payback time, internal rate of return, or net present value (NPV), which are based solely on incremental costs and energy savings. This analysis uses actual energy savings data and incremental construction costs to evaluate the mortgage cash flow for 79 of the 144 energy-efficient homes constructed in Minnesota under the Energy-Efficient Housing Demonstration Program (EEHDP) initiated in 1980 by the Minnesota Housing Finance Agency. Using typical lending terms and fees, we find that the mean mortgage-NPV derived from the homeowners' real cash flow (including construction and financing costs) is 20% lower than the standard engineering-NPV of the conservation investment: $7981 versus $9810. For eight homes, the mortgage-NPV becomes negative once we account for the various mortgage-related effects. Sensitivities to interest rates, down payment, loan term, and marginal tax rate are included to illustrate the often large impact of alternative assumptions about these parameters. The most dramatic effect occurs when the loan term is reduced from 30 to 15 years and the mortgage NPV falls to -$925. We also evaluate the favorable Federal Home Administration (FHA) terms actually applied to the EEHDP homes. 8 refs., 4 figs., 3 tabs.« less
Construction of road network vulnerability evaluation index based on general travel cost
NASA Astrophysics Data System (ADS)
Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin
2018-03-01
With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.
NASA Astrophysics Data System (ADS)
Ziolkowska, J. R.; Scanlon, B. R.; Young, M.
2013-12-01
Water desalination is anticipated to become a prospective solution for mitigating future water shortages in Texas. As of 2010, 46 municipal brackish water desalination plants were operating in Texas with an estimated total desalination capacity of about 120 million gallons per day (2.3% of state water use) (TWDB 2010; TWDB 2013). In 2011, 99% of the State of Texas suffered extreme drought, with large portions suffering through exceptional drought. This event was classified as the one-year drought of record. Moreover, the growing population of Texas and the subsequent growing water demand create an immediate need for long-term planning for a reliable and efficient water supply. Desalination, even though acknowledged as a reliable option in many countries in the world, requires high investment costs and energy inputs. Current costs of desalinated water can range between US1.09/1,000 gallons and US3.7/1,000 gallons (Arroyo and Shirazi 2012), which are about two to three times higher than water costs from conventional sources (San Antonio Water System 2012; AustinTexas.gov 2013). Economic efficiency is still the main factor determining future developments of desalination investments in Texas, and the technology is still emerging. While currently only investment, maintenance and total capital costs per unit water are considered as factors determining viability of a desalination plant, this study aims at depicting a broader picture of socio-economic impacts related to the construction project itself, both in the immediate region and adjacent communities and interlinked sectors. This study presents an Input-Output model for the brackish water desalination plant in San Antonio, with the first stage expected to be completed in 2016. By using multi-regional and sectoral multipliers, the analysis shows that constructing the desalination plant can create 2,050 jobs in the San Antonio region, while it will add 316 more jobs in other regions in Texas by 2016. Construction will also create US133.9M of total added value in the San Antonio region and US36.6M in Texas. The total number of new jobs in the San Antonio region (3,718) and added value of US$262.8M is expected after completing the last construction phase in 2026. This study presents a broad picture of development patterns of desalination plants in Texas and the US, as well as future opportunities and challenges for this technology. It emphasizes the necessity of evaluating economic and social direct, indirect, and induced effects of desalination plants on a macro level, rather than focusing solely on the direct investment costs and costs of desalinated water provided to consumers.
48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...
48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...
48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...
Ostensson, Ellinor; Fröberg, Maria; Hjerpe, Anders; Zethraeus, Niklas; Andersson, Sonia
2010-10-01
To assess the cost-effectiveness of using human papillomavirus testing (HPV triage) in the management of women with minor cytological abnormalities in Sweden. An economic analysis based on a clinical trial, complemented with data from published meta-analyses on accuracy of HPV triage. The study takes perspective of the Swedish healthcare system. The Swedish population-based cervical cancer screening program. A decision analytic model was constructed to evaluate cost-effectiveness of HPV triage compared to repeat cytology and immediate colposcopy with biopsy, stratifying by index cytology (ASCUS = atypical squamous cells of undetermined significance, and LSIL = low-grade squamous intraepithelial lesion) and age (23-60 years, <30 years and ≥30 years). Costs, incremental cost, incremental effectiveness and incremental cost per additional high-grade lesion (CIN2+) detected. For women with ASCUS ≥30 years, HPV triage is the least costly alternative, whereas immediate colposcopy with biopsy provides the most effective option at an incremental cost-effectiveness ratio (ICER) of SEK 2,056 per additional case of CIN2+ detected. For LSIL (all age groups) and ASCUS (23-60 years and <30 years), HPV triage is dominated by immediate colposcopy and biopsy. Model results were sensitive to HPV test cost changes. With improved HPV testing techniques at lower costs, HPV triage can become a cost-effective alternative for follow-up of minor cytological abnormalities. Today, immediate colposcopy with biopsy is a cost-effective alternative compared to HPV triage and repeat cytology.
Life cycle cost modeling of conceptual space vehicles
NASA Technical Reports Server (NTRS)
Ebeling, Charles
1993-01-01
This paper documents progress to date by the University of Dayton on the development of a life cycle cost model for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of a life cycle cost model. Cost categories are initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. The focus will be on operations and maintenance costs and other recurring costs. Secondary tasks performed concurrent with the development of the life cycle costing model include continual support and upgrade of the R&M model. The primary result of the completed research will be a methodology and a computer implementation of the methodology to provide for timely cost analysis in support of the conceptual design activities. The major objectives of this research are: to obtain and to develop improved methods for estimating manpower, spares, software and hardware costs, facilities costs, and other cost categories as identified by NASA personnel; to construct a life cycle cost model of a space transportation system for budget exercises and performance-cost trade-off analysis during the conceptual and development stages; to continue to support modifications and enhancements to the R&M model; and to continue to assist in the development of a simulation model to provide an integrated view of the operations and support of the proposed system.
Societal costs of vascular cognitive impairment in older adults.
Rockwood, Kenneth; Brown, Murray; Merry, Heather; Sketris, Ingrid; Fisk, John
2002-06-01
The construct of vascular cognitive impairment (VCI) includes many whose care is or will be costly. Nevertheless, estimates of these costs are not well described. We therefore set out to estimate the societal costs of VCI in elderly people. In a secondary analysis of the Canadian Study of Health and Aging, a representative cohort study, Canadian dollar costs using a societal perspective were estimated by standard methods. The total annual per-patient societal costs for VCI by severity were $15 022 for those with mild disease, $14 468 for those with mild to moderate disease, $20 063 for those with moderate disease, and $34 515 for those with severe disease. The most expensive component per individual was the cost of institutional long-term care. Although severe impairment was associated with higher costs, the extent of institutionalization at all levels of severity and less drug use among those more severely impaired mitigated a severity-cost gradient. The societal costs of VCI are not inconsiderable. In contrast to Alzheimer disease, there is no clear gradient relating cost to severity. Unpaid caregiver costs are an important aspect of societal costs, even in those with only mild impairment.
Plasma for electrification of chemical industry: a case study on CO2 reduction
NASA Astrophysics Data System (ADS)
van Rooij, G. J.; Akse, H. N.; Bongers, W. A.; van de Sanden, M. C. M.
2018-01-01
Significant growth of the share of (intermittent) renewable power in the chemical industry is imperative to meet increasingly stricter limits on CO2 exhaust that are being implemented within Europe. This paper aims to evaluate the potential of a plasma process that converts input CO2 into a pure stream of CO to aid in renewable energy penetration in this sector. A realistic process design is constructed to serve as a basis for an economical analysis. The manufacturing cost price of CO is estimated at 1.2 kUS ton-1 CO. A sensitivity analysis shows that separation is the dominant cost factor, so that improving conversion is currently more effective to lower the price than e.g. energy efficiency.
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
NASA Astrophysics Data System (ADS)
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Bentley, Anthony; Gillard, Samantha; Spino, Michael; Connelly, John; Tricta, Fernando
2013-09-01
Patients with β-thalassaemia major experience chronic iron overload due to regular blood transfusions. Chronic iron overload can be treated using iron-chelating therapies such as desferrioxamine (DFO), deferiprone (DFP) and deferasirox (DFX) monotherapy, or DFO-DFP combination therapy. This study evaluated the relative cost effectiveness of these regimens over a 5-year timeframe from a UK National Health Service (NHS) perspective, including personal and social services. A Markov model was constructed to evaluate the cost effectiveness of the treatment regimens over 5 years. Based on published randomized controlled trial evidence, it was assumed that all four treatment regimens had a comparable effect on serum ferritin concentration (SFC) and liver iron concentration (LIC), and that DFP was more effective for reducing cardiac morbidity and mortality. Published utility scores for route of administration were used, with subcutaneously administered DFO assumed to incur a greater quality of life (QoL) burden than the oral chelators DFP and DFX. Healthcare resource use, drug costs (2010/2011 costs), and utilities associated with adverse events were also considered, with the effect of varying all parameters assessed in sensitivity analysis. Incremental costs and quality-adjusted life-years (QALYs) were calculated for each treatment, with cost effectiveness expressed as incremental cost per QALY. Assumptions that DFP conferred no cardiac morbidity, mortality, or morbidity and mortality benefit were also explored in scenario analysis. DFP was the dominant strategy in all scenarios modelled, providing greater QALY gains at a lower cost. Sensitivity analysis showed that DFP dominated all other treatments unless the QoL burden associated with the route of administration was greater for DFP than for DFO, which is unlikely to be the case. DFP had >99 % likelihood of being cost effective against all comparators at a willingness-to-pay threshold of £20,000 per QALY. In this analysis, DFP appeared to be the most cost-effective treatment available for managing chronic iron overload in β-thalassaemia patients. Use of DFP in these patients could therefore result in substantial cost savings.
Low-cost satellite mechanical design and construction
NASA Astrophysics Data System (ADS)
Boisjolie-Gair, Nathaniel; Straub, Jeremy
2017-05-01
This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.
Meier, G; Gregg, M; Poulsen Nautrup, B
2015-01-01
To update an earlier evaluation estimating the cost-effectiveness of quadrivalent influenza vaccination (QIV) compared with trivalent influenza vaccination (TIV) in the adult population currently recommended for influenza vaccination in the UK (all people aged ≥65 years and people aged 18-64 years with clinical risk conditions). This analysis takes into account updated vaccine prices, reference costs, influenza strain circulation, and burden of illness data. A lifetime, multi-cohort, static Markov model was constructed with seven age groups. The model was run in 1-year cycles for a lifetime, i.e., until the youngest patients at entry reached the age of 100 years. The base-case analysis was from the perspective of the UK National Health Service, with a secondary analysis from the societal perspective. Costs and benefits were discounted at 3.5%. Herd effects were not included. Inputs were derived from systematic reviews, peer-reviewed articles, and government publications and databases. One-way and probabilistic sensitivity analyses were performed. In the base-case, QIV would be expected to avoid 1,413,392 influenza cases, 41,780 hospitalizations, and 19,906 deaths over the lifetime horizon, compared with TIV. The estimated incremental cost-effectiveness ratio (ICER) was £14,645 per quality-adjusted life-year (QALY) gained. From the societal perspective, the estimated ICER was £13,497/QALY. A strategy of vaccinating only people aged ≥65 years had an estimated ICER of £11,998/QALY. Sensitivity analysis indicated that only two parameters, seasonal variation in influenza B matching and influenza A circulation, had a substantial effect on the ICER. QIV would be likely to be cost-effective compared with TIV in 68% of simulations with a willingness-to-pay threshold of <£20,000/QALY and 87% with a willingness-to-pay threshold of <£30,000/QALY. In this updated analysis, QIV was estimated to be cost-effective compared with TIV in the U.K.
STANDARDIZED COSTS FOR WATER SUPPLY DISTRIBUTION SYSTEMS
Presented within the report are cost data for construction and operation/maintenance of domestic water distribution and transmission pipelines, domestic water pumping stations, and domestic water storage reservoirs. To allow comparison of new construction with rehabilitation of e...
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
Marino, Patricia; Siani, Carole; Roché, Henri; Moatti, Jean-Paul
2005-01-01
The object of this study was to determine, taking into account uncertainty on cost and outcome parameters, the cost-effectiveness of high-dose chemotherapy (HDC) compared with conventional chemotherapy for advanced breast cancer patients. An analysis was conducted for 300 patients included in a randomized clinical trial designed to evaluate the benefits, in terms of disease-free survival and overall survival, of adding a single course of HDC to a four-cycle conventional-dose chemotherapy for breast cancer patients with axillary lymph node invasion. Costs were estimated from a detailed observation of physical quantities consumed, and the Kaplan-Meier method was used to evaluate mean survival times. Incremental cost-effectiveness ratios were evaluated successively considering disease-free survival and overall survival outcomes. Handling of uncertainty consisted in construction of confidence intervals for these ratios, using the truncated Fieller method. The cost per disease-free life year gained was evaluated at 13,074 Euros, a value that seems to be acceptable to society. However, handling uncertainty shows that the upper bound of the confidence interval is around 38,000 Euros, which is nearly three times higher. Moreover, as no difference was demonstrated in overall survival between treatments, cost-effectiveness analysis, that is a cost minimization, indicated that the intensive treatment is a dominated strategy involving an extra cost of 7,400 Euros, for no added benefit. Adding a single course of HDC led to a clinical benefit in terms of disease-free survival for an additional cost that seems to be acceptable, considering the point estimate of the ratio. However, handling uncertainty indicates a maximum ratio for which conclusions have to be discussed.
Konijeti, Gauree G.; Sauk, Jenny; Shrime, Mark G.; Gupta, Meera; Ananthakrishnan, Ashwin N.
2014-01-01
Background. Clostridium difficile infection (CDI) is an important cause of morbidity and healthcare costs, and is characterized by high rates of disease recurrence. The cost-effectiveness of newer treatments for recurrent CDI has not been examined, yet would be important to inform clinical practice. The aim of this study was to analyze the cost effectiveness of competing strategies for recurrent CDI. Methods. We constructed a decision-analytic model comparing 4 treatment strategies for first-line treatment of recurrent CDI in a population with a median age of 65 years: metronidazole, vancomycin, fidaxomicin, and fecal microbiota transplant (FMT). We modeled up to 2 additional recurrences following the initial recurrence. We assumed FMT delivery via colonoscopy as our base case, but conducted sensitivity analyses based on different modes of delivery. Willingness-to-pay threshold was set at $50 000 per quality-adjusted life-year. Results. At our base case estimates, initial treatment of recurrent CDI using FMT colonoscopy was the most cost-effective strategy, with an incremental cost-effectiveness ratio of $17 016 relative to oral vancomycin. Fidaxomicin and metronidazole were both dominated by FMT colonoscopy. On sensitivity analysis, FMT colonoscopy remained the most cost-effective strategy at cure rates >88.4% and CDI recurrence rates <14.9%. Fidaxomicin required a cost <$1359 to meet our cost-effectiveness threshold. In clinical settings where FMT is not available or applicable, the preferred strategy appears to be initial treatment with oral vancomycin. Conclusions. In this decision analysis examining treatment strategies for recurrent CDI, we demonstrate that FMT colonoscopy is the most cost-effective initial strategy for management of recurrent CDI. PMID:24692533
Cost-effectiveness of prenatal screening strategies for congenital heart disease.
Pinto, N M; Nelson, R; Puchalski, M; Metz, T D; Smith, K J
2014-07-01
The economic implications of strategies to improve prenatal screening for congenital heart disease (CHD) in low-risk mothers have not been explored. The aim was to perform a cost-effectiveness analysis of different screening methods. We constructed a decision analytic model of CHD prenatal screening strategies (four-chamber screen (4C), 4C + outflow, nuchal translucency (NT) or fetal echocardiography) populated with probabilities from the literature. The model included whether initial screens were interpreted by a maternal-fetal medicine (MFM) specialist and different referral strategies if they were read by a non-MFM specialist. The primary outcome was the incremental cost per defect detected. Costs were obtained from Medicare National Fee estimates. A probabilistic sensitivity analysis was undertaken on model variables commensurate with their degree of uncertainty. In base-case analysis, 4C + outflow referred to an MFM specialist was the least costly strategy per defect detected. The 4C screen and the NT screen were dominated by other strategies (i.e. were more costly and less effective). Fetal echocardiography was the most effective, but most costly. On simulation of 10 000 low-risk pregnancies, 4C + outflow screen referred to an MFM specialist remained the least costly per defect detected. For an additional $580 per defect detected, referral to cardiology after a 4C + outflow was the most cost-effective for the majority of iterations, increasing CHD detection by 13 percentage points. The addition of examination of the outflow tracts to second-trimester ultrasound increases detection of CHD in the most cost-effective manner. Strategies to improve outflow-tract imaging and to refer with the most efficiency may be the best way to improve detection at a population level. Copyright © 2013 ISUOG. Published by John Wiley & Sons Ltd.
Cost-utility of a six-month programmed sports therapy (PST) in patients with haemophilia.
Koeberlein-Neu, J; Runkel, B; Hilberg, T
2018-03-30
Recurrent musculoskeletal haemorrhages in people with haemophilia (PwH) lead to restrictions in the locomotor system and, as a result, in physical performance, too. Due to its physical and psychological benefits, sport is increasingly re-commended for haemophilic patients. Evidence on the cost-effectiveness of sports therapy is still lacking. The aim of this study was to determine the cost-effectiveness of a 6-month programmed sports therapy (PST). The cost-effectiveness of the 6-month PST was assessed from a societal perspective alongside a RCT using cost-utility analysis. The analysis included 50 PwH with moderate-to-severe haemophilia A and B and a training period over 6 months. The health-related quality of life was measured with the EuroQoL-domain questionnaire. Resource utilization was assessed by questionnaire before and after the intervention. A cost-effectiveness acceptability curve was constructed, and sensitivity analyses were performed. During the 6-month study period, mean adjusted total healthcare costs were lower (mean difference: -22 805 EUR; 95%-CI: -73 944-48 463; P = .59) and the number of QALYs was higher in the intervention group (mean difference: 0.3733; 95%-CI: 0.0014-0.0573; P = .04). The probability of an incremental cost-effectiveness ratio <50 000 EUR per QALY was 71%. The performed sensitivity analysis confirmed these results. Results showed that the PST is effective in terms of a significant gain of QALYs. Furthermore, results weakly indicate the potential of the PST to reduce healthcare costs. Future studies should expand the observation period to have a closer look at the influence of PST on lifetime costs. © 2018 John Wiley & Sons Ltd.
Messali, Andrew; Hay, Joel W.; Villacorta, Reginald
2013-01-01
Background The objective of this work was to determine the cost-effectiveness of temozolomide compared with that of radiotherapy alone in the adjuvant treatment of newly diagnosed glioblastoma. Temozolomide is the only chemotherapeutic agent to have demonstrated a significant survival benefit in a randomized clinical trial. Our analysis builds on earlier work by incorporating caregiver time costs and generic temozolomide availability. It is also the first analysis applicable to the US context. Methods A systematic literature review was conducted to collect relevant data. Transition probabilities were calculated from randomized controlled trial data comparing temozolomide plus radiotherapy with radiotherapy alone. Direct costs were calculated from charges reported by the Mayo Clinic. Utilities were obtained from a previous cost-utility analysis. Using these data, a Markov model with a 1-month cycle length and 5-year time horizon was constructed. Results The addition of brand Temodar and generic temozolomide to the standard radiotherapy regimen was associated with base-case incremental cost-effectiveness ratios of $102 364 and $8875, respectively, per quality-adjusted life-year. The model was most sensitive to the progression-free survival associated with the use of only radiotherapy. Conclusions Both the brand and generic base-case estimates are cost-effective under a willingness-to-pay threshold of $150 000 per quality-adjusted life-year. All 1-way sensitivity analyses produced incremental cost-effectiveness ratios below this threshold. We conclude that both the brand Temodar and generic temozolomide are cost-effective treatments for newly diagnosed glioblastoma within the US context. However, assuming that the generic product produces equivalent quality of life and survival benefits, it would be significantly more cost-effective than the brand option. PMID:23935155
Reddy, Vivek Y.; Akehurst, Ronald L.; Armstrong, Shannon O.; Amorosi, Stacey L.; Brereton, Nic; Hertz, Deanna S.; Holmes, David R.
2016-01-01
Abstract Aims Atrial fibrillation (AF) patients with contraindications to oral anticoagulation have had few options for stroke prevention. Recently, a novel oral anticoagulant, apixaban, and percutaneous left atrial appendage closure (LAAC) have emerged as safe and effective therapies for stroke risk reduction in these patients. This analysis assessed the cost effectiveness of LAAC with the Watchman device relative to apixaban and aspirin therapy in patients with non-valvular AF and contraindications to warfarin therapy. Methods and results A cost-effectiveness model was constructed using data from three studies on stroke prevention in patients with contraindications: the ASAP study evaluating the Watchman device, the ACTIVE A trial of aspirin and clopidogrel, and the AVERROES trial evaluating apixaban. The cost-effectiveness analysis was conducted from a German healthcare payer perspective over a 20-year time horizon. Left atrial appendage closure yielded more quality-adjusted life years (QALYs) than aspirin and apixaban by 2 and 4 years, respectively. At 5 years, LAAC was cost effective compared with aspirin with an incremental cost-effectiveness ratio (ICER) of €16 971. Left atrial appendage closure was cost effective compared with apixaban at 7 years with an ICER of €9040. Left atrial appendage closure was cost saving and more effective than aspirin and apixaban at 8 years and remained so throughout the 20-year time horizon. Conclusions This analysis demonstrates that LAAC with the Watchman device is a cost-effective and cost-saving solution for stroke risk reduction in patients with non-valvular AF who are at risk for stroke but have contraindications to warfarin. PMID:26838691
Cram, Peter; Vijan, Sandeep; Wolbrink, Alex; Fendrick, A Mark
2003-01-01
Traditional cost-utility analysis assumes that all benefits from health-related interventions are captured by the quality-adjusted life-years (QALYs) gained by the few individuals whose outcome is improved by the intervention. However, it is possible that many individuals who do not directly benefit from an intervention receive utility, and therefore QALYs, because of the passive benefit (aka sense of security) provided by the existence of the intervention. The objective of this study was to evaluate the impact that varying quantities of passive benefit have on the cost-effectiveness of airline defibrillator programs. A decision analytic model with Markov processes was constructed to evaluate the cost-effectiveness of defibrillator deployment on domestic commercial passenger aircraft over 1 year. Airline passengers were assigned small incremental utility gains (.001-.01) during an estimated 3-hour flight to evaluate the impact of passive benefit on overall cost-effectiveness. In the base case analysis with no allowance for passive benefit, the cost-effectiveness of airline automated external defibrillator deployment was US dollars 34000 per QALY gained. If 1% of all passengers received utility gain of.01, the cost-effectiveness declined to US dollars 30000. Cost-effectiveness was enhanced when the quantity of passive benefit was raised or the percentage of individuals receiving passive benefit increased. Automated external defibrillator deployment on passenger aircraft is likely to be cost-effective. If a small percentage of airline passengers receive incremental utility gains from passive benefit of automated external defibrillator availability, the impact on overall cost-effectiveness may be substantial. Further research should attempt to clarify the magnitude and percentage of patients who receive passive benefit.
Tsukiyama, Ikuto; Ejiri, Masayuki; Yamamoto, Yoshihiro; Nakao, Haruhisa; Yoneda, Masashi; Matsuura, Katsuhiko; Arakawa, Ichiro; Saito, Hiroko; Inoue, Tadao
2017-12-01
This study assessed the cost-effectiveness of combination treatment with gemcitabine and cisplatin compared to treatment with gemcitabine alone for advanced biliary tract cancer (BTC) in Japan. A monthly transmitted Markov model of three states was constructed based on the Japan BT-22 trial. Transition probabilities among the health states were derived from a trial conducted in Japan and converted to appropriate parameters for our model. The associated cost components, obtained from a receipt-based survey undertaken at the Aichi Medical University Hospital, were those related to inpatient care, outpatient care, and treatment for BTC. Costs for palliative care and treatment of adverse events were obtained from the National Health Insurance price list. We estimated cost-effectiveness per quality-adjusted life year (QALY) at a time horizon of 36 months. An annual discount of 3 % for both cost and outcome was considered. The base case outcomes indicated that combination therapy was less cost-effective than monotherapy when the incremental cost-effectiveness ratio (ICER) was approximately 14 million yen per QALY gained. The deterministic sensitivity analysis of the ICER revealed that the ICER of the base case was robust. A probabilistic analysis conducted with 10,000-time Monte Carlo simulations demonstrated efficacy at the willingness to pay threshold of 6 million yen per QALY gained for approximately 33 % of the population. In Japan, combination therapy is less cost-effective than monotherapy for treating advanced BTC, regardless of the statistical significance of the two therapies. Useful information on the cost-effectiveness of chemotherapy is much needed for the treatment of advanced BTC in Japan.
Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis
NASA Technical Reports Server (NTRS)
Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven
1997-01-01
Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.
Solving lot-sizing problem with quantity discount and transportation cost
NASA Astrophysics Data System (ADS)
Lee, Amy H. I.; Kang, He-Yau; Lai, Chun-Mei
2013-04-01
Owing to today's increasingly competitive market and ever-changing manufacturing environment, the inventory problem is becoming more complicated to solve. The incorporation of heuristics methods has become a new trend to tackle the complex problem in the past decade. This article considers a lot-sizing problem, and the objective is to minimise total costs, where the costs include ordering, holding, purchase and transportation costs, under the requirement that no inventory shortage is allowed in the system. We first formulate the lot-sizing problem as a mixed integer programming (MIP) model. Next, an efficient genetic algorithm (GA) model is constructed for solving large-scale lot-sizing problems. An illustrative example with two cases in a touch panel manufacturer is used to illustrate the practicality of these models, and a sensitivity analysis is applied to understand the impact of the changes in parameters to the outcomes. The results demonstrate that both the MIP model and the GA model are effective and relatively accurate tools for determining the replenishment for touch panel manufacturing for multi-periods with quantity discount and batch transportation. The contributions of this article are to construct an MIP model to obtain an optimal solution when the problem is not too complicated itself and to present a GA model to find a near-optimal solution efficiently when the problem is complicated.
El-Naggar, Hesham M
2010-01-01
The main activity in Siwa Oasis society is the agriculture, it depends on the groundwater. The agricultural drainage water and the unused saline water of naturally flowing springs are poured into four main salty lakes. This leads to an increase in the surface area of the saltwater lakes, marshes and rise in water table levels. to investigate some environmental engineering interventions to control the expansion of saltwater surface area in Siwa Oasis. Field visits, observation sheets and questionnaire survey with farmers were carried out to find out the main environmental problems in the Oasis. Environmental survey was carried out to collect different rocks and stones samples as natural construction materials from the desert that surrounds Siwa Oasis. Physical analyses, chemical composition and principal mechanical parameters were conducted on the collected samples. After the analysis, the safa rocks were the best natural construction materials in the Siwa Oasis. So, it could be used to build a construction wall around the salty lakes and marshes. Walls could convert the lakes into basins. The water will be evaporated at high rate during summer season by solar energy. After evaporation, the remaining salty rock named "karshef" can be easily collected from the lakes to be used as a low cost construction material for traditional building houses in Siwa Oasis. Therefore, the water level of lakes will be reduced to dryness and land could be reused as agricultural land. Among different rocks, safa rocks proved to be the best natural construction materials to construct a defense wall around the lakes and marshes. They will save about 80% of the concrete cost. The formed karshef rocks from the lakes will be used in the construction of the traditional building houses which will save about 90% of the concrete buildings. This intervention will save energy as it exchanges fuel consuming man-made material such as cement with naturally made material. This can reduce the green house gases generated from the cement industry. Economical feasibility study should be carried out to estimate the capital cost for the retaining wall.
Cain-Nielsen, Anne H; Moriarty, James P; Stewart, Elizabeth A; Borah, Bijan J
2014-09-01
To evaluate the cost-effectiveness of the following three treatments of uterine fibroids in a population of premenopausal women who wish to preserve their uteri: myomectomy, magnetic resonance-guided focused ultrasound (MRgFUS) and uterine artery embolization (UAE). A decision analytic Markov model was constructed. Cost-effectiveness was calculated in terms of US$ per quality-adjusted life year (QALY) over 5 years. Two types of costs were calculated: direct costs only, and the sum of direct and indirect (productivity) costs. Women in the hypothetical cohort were assessed for treatment type eligibility, were treated based on eligibility, and experienced adequate or inadequate symptom relief. Additional treatment (myomectomy) occurred for inadequate symptom relief or recurrence. Sensitivity analysis was conducted to evaluate uncertainty in the model parameters. In the base case, myomectomy, MRgFUS and UAE had the following combinations of mean cost and mean QALYs, respectively: US$15,459, 3.957; US$15,274, 3.953; and US$18,653, 3.943. When incorporating productivity costs, MRgFUS incurred a mean cost of US$21,232; myomectomy US$22,599; and UAE US$22,819. Using probabilistic sensitivity analysis (PSA) and excluding productivity costs, myomectomy was cost effective at almost every decision threshold. Using PSA and incorporating productivity costs, myomectomy was cost effective at decision thresholds above US$105,000/QALY; MRgFUS was cost effective between US$30,000 and US$105,000/QALY; and UAE was cost effective below US$30,000/QALY. Myomectomy, MRgFUS, and UAE were similarly effective in terms of QALYs gained. Depending on assumptions about costs and willingness to pay for additional QALYs, all three treatments can be deemed cost effective in a 5-year time frame.
James, Robbie; Salton, Ryan Ishmael; Byrnes, Joshua Michael; Scuffham, Paul Anthony
2017-12-01
The uptake of bariatric surgery in Australia has been hampered by the lack of funding and lack of evidence on relative value for money. To determine the cost-effectiveness of adjustable gastric banding (AGB), Roux-En-Y gastric bypass (RYGB), and sleeve gastrectomy (SG) versus usual care (UC). Perspective of the Australian public healthcare system. A Markov model was constructed to simulate the costs and outcomes for 4 approaches to managing obesity. The base-case was a 30-year-old Australian female with a body-mass index>35. Subgroup analysis was conducted to account for the effect of diabetes as well as various differences in cohort characteristics. Uncertainty was characterised by one-way and probabilistic sensitivity analyses. All bariatric surgeries were effective. The incremental cost-effectiveness ratios were similar at $24,454 for AGB, $22,645 for RYGB, and $27,523 for SG, compared with UC. At a willingness to pay threshold of $70,000 per quality-adjusted life year, the probabilities of being cost-effective were 64%, 75%, and 71% for AGB, RYGB, and SG, respectively. Subgroup analysis showed that bariatric procedures are less cost-effective for older cohorts. For those with diabetes, all the procedures were dominant in comparison with UC. This model shows that all bariatric procedures are a cost-effective treatment for the management of obese patients. When given to a subgroup with diabetes, bariatric interventions become cost-saving. Copyright © 2017 American Society for Bariatric Surgery. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Chowdhury, Md Mukul
With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.
Inkjet Printed Surface Enhanced Raman Spectroscopy Array on Cellulose Paper
Yu, Wei W.; White, Ian M.
2011-01-01
A novel, ultra low-cost surface enhanced Raman spectroscopy (SERS) substrate has been developed by modifying the surface chemistry of cellulose paper and patterning nanoparticle arrays, all with a consumer inkjet printer. Micro/nanofabrication of SERS substrates for on-chip chemical and biomolecular analysis has been under intense investigation. However, the high cost of producing these substrates and the limited shelf life severely limit their use, especially for routine laboratory analysis and for point-of-sample analysis in the field. Paper-based microfluidic biosensing systems have shown great potential as low-cost disposable analysis tools. In this work, this concept is extended to SERS-based detection. Using an inexpensive consumer inkjet printer, cellulose paper substrates are modified to be hydrophobic in the sensing regions. Synthesized silver nanoparticles are printed onto this hydrophobic paper substrate with microscale precision to form sensing arrays. The hydrophobic surface prevents the aqueous sample from spreading throughout the paper and thus concentrates the analyte within the sensing region. A SERS fingerprint signal for Rhodamine 6G dye was observed for samples with as low as 10 femtomoles of analyte in a total sample volume of 1 μL. This extraordinarily simple technique can be used to construct SERS microarrays immediately before sample analysis, enabling ultra low-cost chemical and biomolecular detection in the lab as well as in the field at the point of sample collection. PMID:21058689
The design and construction of a cost-efficient confocal laser scanning microscope
NASA Astrophysics Data System (ADS)
Xi, Peng; Rajwa, Bartlomiej; Jones, James T.; Robinson, J. Paul
2007-03-01
The optical dissection ability of confocal microscopy makes it a powerful tool for biological materials. However, the cost and complexity of confocal scanning laser microscopy hinders its wide application in education. We describe the construction of a simplified confocal scanning laser microscope and demonstrate three-dimensional projection based on cost-efficient commercial hardware, together with available open source software.