Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.
ERIC Educational Resources Information Center
Bilginsoy, Cihan; Philips, Peter
2000-01-01
Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…
Construction machine control guidance implementation strategy.
DOT National Transportation Integrated Search
2010-07-01
Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...
The Need for Full Cost Control in Universities and Colleges Capital Expenditure Programmes.
ERIC Educational Resources Information Center
Aitchison, Ian A.
Cost control techniques as applied to university and college capital expenditure programs are discussed, as is the need for control of costs as an integral part of the design and construction of campus projects. The following phases of the cost control process are presented: pre-design advice and cost studies, preparation of the budget for the…
Academic Building Systems. A Technique to Maximize Control of Construction Costs.
ERIC Educational Resources Information Center
Clark, Donald H.
1972-01-01
Academic Building Systems (ABS) is an architectural planning and design method which allows the construction owner to respond to the need for less expensive structures, economically adaptable to the changing conditions of the academic world, by providing the owner with the maximum controls over the variable cost factors in educational facility…
RETROFITTING CONTROL FACILITIES FOR WET-WEATHER FLOW CONTROL
Available technologies were evaluated to demonstrate the feasibility and cost effectiveness of retrofitting existing facilities to handle wet-weather flow (WWF). Cost/benefit relationships were compared to construction of new conventional control and treatment facilities. Desktop...
Construction Management Meets Today's Realities.
ERIC Educational Resources Information Center
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
The Contractor's Role in Competitive Bid Construction.
ERIC Educational Resources Information Center
Toy, G. Arlan
1986-01-01
In a competitive bid situation, the general contractor's first priority is controlling construction costs. The actions the general contractor take focus on adequate control, effective communication, efficient use of resources, and prevention of delays. (MLF)
The prediction of engineering cost for green buildings based on information entropy
NASA Astrophysics Data System (ADS)
Liang, Guoqiang; Huang, Jinglian
2018-03-01
Green building is the developing trend in the world building industry. Additionally, construction costs are an essential consideration in building constructions. Therefore, it is necessary to investigate the problems of cost prediction in green building. On the basis of analyzing the cost of green building, this paper proposes the forecasting method of actual cost in green building based on information entropy and provides the forecasting working procedure. Using the probability density obtained from statistical data, such as labor costs, material costs, machinery costs, administration costs, profits, risk costs a unit project quotation and etc., situations can be predicted which lead to cost variations between budgeted cost and actual cost in constructions, through estimating the information entropy of budgeted cost and actual cost. The research results of this article have a practical significance in cost control of green building. Additionally, the method proposed in this article can be generalized and applied to a variety of other aspects in building management.
Categorization of potential project cost overrun factors in construction industry
NASA Astrophysics Data System (ADS)
Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.
2018-04-01
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
RETROFITTING CONTROL FACILITIES FOR WET WEATHER FLOW TREATMENT
Available technologies were evaluated to demonstrate the technical feasibility and cost-effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilitie...
RETROFITTING CONTROL FACILITIES FOR WET-WEATHER FLOW TREATMENT
Available technologies were evaluated to demonstrate the technical feasibility and cost effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilities...
Safety cost management in construction companies: A proposal classification.
López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C
2016-06-16
Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.
Implementation of GPS controlled highway construction equipment.
DOT National Transportation Integrated Search
2007-04-01
dozers, motor graders, and excavators is quickly becoming common place in private sector construction because it speeds project delivery and cuts costs. Use of this technology is expanding quickly into other construction equipment areas such as paver...
1988-12-01
COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type
A model for interprovincial air pollution control based on futures prices.
Zhao, Laijun; Xue, Jian; Gao, Huaizhu Oliver; Li, Changmin; Huang, Rongbing
2014-05-01
Based on the current status of research on tradable emission rights futures, this paper introduces basic market-related assumptions for China's interprovincial air pollution control problem. The authors construct an interprovincial air pollution control model based on futures prices: the model calculated the spot price of emission rights using a classic futures pricing formula, and determined the identities of buyers and sellers for various provinces according to a partitioning criterion, thereby revealing five trading markets. To ensure interprovincial cooperation, a rational allocation result for the benefits from this model was achieved using the Shapley value method to construct an optimal reduction program and to determine the optimal annual decisions for each province. Finally, the Beijing-Tianjin-Hebei region was used as a case study, as this region has recently experienced serious pollution. It was found that the model reduced the overall cost of reducing SO2 pollution. Moreover, each province can lower its cost for air pollution reduction, resulting in a win-win solution. Adopting the model would therefore enhance regional cooperation and promote the control of China's air pollution. The authors construct an interprovincial air pollution control model based on futures prices. The Shapley value method is used to rationally allocate the cooperation benefit. Interprovincial pollution control reduces the overall reduction cost of SO2. Each province can lower its cost for air pollution reduction by cooperation.
The cost of construction delays and traffic control for life-cycle cost analysis of pavements
DOT National Transportation Integrated Search
2002-03-01
The objective of this report is to provide the Kentucky Transportation Cabinet a reliable approach to quantifying/calculating "Road User Cost"--often referred to as total user delay costs. To meet this objective, this report is divided into three mai...
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
ERIC Educational Resources Information Center
Bowen, Brian
1974-01-01
The third installment of a Building Cost File points out the necessity of providing a framework for overall cost control during design. A cost analysis (see EA 504 571) illustrates how the use of construction elements or subsystems provide a suitable means. Other related articles are EA 503 949, 950, 951, and EA 504 578-579. (MF)
Impact of ICT on Performance of Construction Companies in Slovakia
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
Information and communication technologies became a part of management tools in modern companies. Construction industry and its participants deal with a serious requirement for processing the huge amount of information on construction projects including design, construction, time and cost parameters, economic efficiency and sustainability. To fulfil this requirement, companies have to use appropriate ICT tools. Aim of the paper is to examine the impact of ICT exploitation on performance of construction companies. The impact of BIM tools, ERP systems and controlling system on cost and profit indicators will be measured on the sample of 85 companies from construction industry in Slovakia. Enterprise size, enterprise ownership and role in construction process will be set as independent variables for statistical analyse. The results will be considered for different groups of companies.
THE CRITICAL-PATH METHOD OF CONSTRUCTION CONTROL.
ERIC Educational Resources Information Center
DOMBROW, RODGER T.; MAUCHLY, JOHN
THIS DISCUSSION PRESENTS A DEFINITION AND BRIEF DESCRIPTION OF THE CRITICAL-PATH METHOD AS APPLIED TO BUILDING CONSTRUCTION. INTRODUCING REMARKS CONSIDER THE MOST PERTINENT QUESTIONS PERTAINING TO CPM AND THE NEEDS ASSOCIATED WITH MINIMIZING TIME AND COST ON CONSTRUCTION PROJECTS. SPECIFIC DISCUSSION INCLUDES--(1) ADVANTAGES OF NETWORK TECHNIQUES,…
Construction and calibration of a low cost and fully automated vibrating sample magnetometer
NASA Astrophysics Data System (ADS)
El-Alaily, T. M.; El-Nimr, M. K.; Saafan, S. A.; Kamel, M. M.; Meaz, T. M.; Assar, S. T.
2015-07-01
A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability.
French Modular Impoundment: Final Cost and Performance Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drown, Peter; French, Bill
This report comprises the Final Cost and Performance Report for the Department of Energy Award # EE0007244, the French Modular Impoundment (aka the “French Dam”.) The French Dam is a system of applying precast modular construction to water control structures. The “French Dam” is a term used to cover the construction means/methods used to construct or rehabilitate dams, diversion structures, powerhouses, and other hydraulic structures which impound water and are covered under FDE’s existing IP (Patents # US8414223B2; US9103084B2.)
Development of integrated control system for smart factory in the injection molding process
NASA Astrophysics Data System (ADS)
Chung, M. J.; Kim, C. Y.
2018-03-01
In this study, we proposed integrated control system for automation of injection molding process required for construction of smart factory. The injection molding process consists of heating, tool close, injection, cooling, tool open, and take-out. Take-out robot controller, image processing module, and process data acquisition interface module are developed and assembled to integrated control system. By adoption of integrated control system, the injection molding process can be simplified and the cost for construction of smart factory can be inexpensive.
Development of rational pay factors based on concrete compressive strength data
DOT National Transportation Integrated Search
2008-06-01
This research project addresses the opportunity to contain the escalating costs of concrete materials in construction projects. Both statistical process control and rational acceptance criteria show that quality improvement and cost savings can be ac...
REAL TIME CONTROL OF SEWERS: US EPA MANUAL
The problem of sewage spills and local flooding has traditionally been addressed by large scale capital improvement programs that focus on construction alternatives such as sewer separation or construction of storage facilities. The cost of such projects is often high, especiall...
Effect on asphalt quality due to nighttime construction : final report.
DOT National Transportation Integrated Search
2017-06-01
The objectives of this project were to identify and analyze the nighttime paving traffic control standards in other states and compare the effects of daytime vs. nighttime paving on quality, safety, costs, and construction time. Surveys of various De...
Solar power satellite system definition study, phase 2.
NASA Technical Reports Server (NTRS)
1979-01-01
A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.
ERIC Educational Resources Information Center
Kennedy, Mike
2009-01-01
When Fayette County (Kentucky) school officials began putting together estimates for upcoming renovation projects at two elementary schools, they based their projections on their district construction projects from 2007. But by February, when construction bids were opened for the renovations of Cassidy and Russell Cave elementary schools, the…
Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.
Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V
2017-03-01
Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.
Energy Center Structure Optimization by using Smart Technologies in Process Control System
NASA Astrophysics Data System (ADS)
Shilkina, Svetlana V.
2018-03-01
The article deals with practical application of fuzzy logic methods in process control systems. A control object - agroindustrial greenhouse complex, which includes its own energy center - is considered. The paper analyzes object power supply options taking into account connection to external power grids and/or installation of own power generating equipment with various layouts. The main problem of a greenhouse facility basic process is extremely uneven power consumption, which forces to purchase redundant generating equipment idling most of the time, which quite negatively affects project profitability. Energy center structure optimization is largely based on solving the object process control system construction issue. To cut investor’s costs it was proposed to optimize power consumption by building an energy-saving production control system based on a fuzzy logic controller. The developed algorithm of automated process control system functioning ensured more even electric and thermal energy consumption, allowed to propose construction of the object energy center with a smaller number of units due to their more even utilization. As a result, it is shown how practical use of microclimate parameters fuzzy control system during object functioning leads to optimization of agroindustrial complex energy facility structure, which contributes to a significant reduction in object construction and operation costs.
ERIC Educational Resources Information Center
Foreman, Phillip
2009-01-01
Education administrators involved in construction initiatives unanimously agree that when it comes to change orders, less is more. Change orders have a negative rippling effect of driving up building costs and producing expensive project delays that often interfere with school operations and schedules. Some change orders are initiated by schools…
Research on the optimization of quota design in real estate
NASA Astrophysics Data System (ADS)
Sun, Chunling; Ma, Susu; Zhong, Weichao
2017-11-01
Quota design is one of the effective methods of cost control in real estate development project and widely used in the current real estate development project to control the engineering construction cost, but quota design have many deficiencies in design process. For this purpose, this paper put forward a method to achieve investment control of real estate development project, which combine quota design and value engineering(VE) at the stage of design. Specifically, it’s an optimizing for the structure of quota design. At first, determine the design limits by investment estimate value, then using VE to carry on initial allocation of design limits and gain the functional target cost, finally, consider the whole life cycle cost (LCC) and operational problem in practical application to finish complex correction for the functional target cost. The improved process can control the project cost more effectively. It not only can control investment in a certain range, but also make the project realize maximum value within investment.
Value Engineering. "A Working Tool for Cost Control in the Design of Educational Facilities."
ERIC Educational Resources Information Center
Lawrence, Jerry
Value Engineering (VE) is a cost optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. By using VE, the optimum value for every life cycle dollar spent on a facility is obtained by identifying not…
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
NASA Astrophysics Data System (ADS)
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
ERIC Educational Resources Information Center
Lundt, John C.; Matt, John
2001-01-01
As serving as its own contractor, a small district in western Montana saved money, had better control over the project, and inspired public confidence. Major advantages were cost savings, controlling the pace of construction, and the ability to cope with change orders. (MLF)
Liu, Derong; Wang, Ding; Wang, Fei-Yue; Li, Hongliang; Yang, Xiong
2014-12-01
In this paper, the infinite horizon optimal robust guaranteed cost control of continuous-time uncertain nonlinear systems is investigated using neural-network-based online solution of Hamilton-Jacobi-Bellman (HJB) equation. By establishing an appropriate bounded function and defining a modified cost function, the optimal robust guaranteed cost control problem is transformed into an optimal control problem. It can be observed that the optimal cost function of the nominal system is nothing but the optimal guaranteed cost of the original uncertain system. A critic neural network is constructed to facilitate the solution of the modified HJB equation corresponding to the nominal system. More importantly, an additional stabilizing term is introduced for helping to verify the stability, which reinforces the updating process of the weight vector and reduces the requirement of an initial stabilizing control. The uniform ultimate boundedness of the closed-loop system is analyzed by using the Lyapunov approach as well. Two simulation examples are provided to verify the effectiveness of the present control approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-09-01
Momentum behind zero energy building design and construction is increasing, presenting a tremendous opportunity for advancing energy performance in the commercial building industry. At the same time, there is a lingering perception that zero energy buildings must be cost prohibitive or limited to showcase projects. Fortunately, an increasing number of projects are demonstrating that high performance can be achieved within typical budgets. This factsheet highlights replicable, recommended strategies for achieving high performance on a budget, based on experiences from past projects.
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
The design, effectiveness and construction of passive-thermal-control roofing shingles
NASA Astrophysics Data System (ADS)
Wolf, L., Jr.
1982-09-01
The concept of a passive thermal control roofing shingle, which is a shingle that reflects the summer sun and absorbs the winter sun, is discussed. It is indicated that it is possible to design shingles for particular latitudes and styles of roof which absorb nearly all of the winter solar energy and reflect nearly all of the summer solar energy. Calculations of the energy savings and cost effectiveness of the passive thermal control roofing shingle indicate that it is most cost effective on all south facing pitched roofs regardless of heating fuel type, and on flat or east or west facing roofs that are heated with costly fuels such as electricity or heating oil. The shingle is most effective on poorly insulated structures. The feasibility of using the passive thermal control roofing shingle in conjunction with a heat pump to pump heat absorbed by the shingle into a well insulated structure is demonstrated. Construction of a variety of models of the passive thermal control roofing shingle illustrate numerous alternate methods of manufacture. A profile extruded, plastic, glazed shingle appears to be the most promising approach. Use of a glazed shingle can increase the effectiveness of the passive thermal control roofing shingle by reducing convective heat losses.
Groeneveld, Iris F; Proper, Karin I; van der Beek, Allard J; van Duivenbooden, Cor; van Mechelen, Willem
2008-01-01
Background Of all workers in Dutch construction industry, 20% has an elevated risk of cardiovascular disease (CVD). A major risk factor for CVD risk is an unhealthy lifestyle. The aim of our study is to design a lifestyle intervention for construction workers with an elevated CVD risk, and to evaluate its (cost-) effectiveness. Methods/Design In a RCT, 692 participants will be randomised to either the control or the intervention group. The control group will receive usual care. For the intervention group, a lifestyle intervention has been designed based on interviews and current literature. The intervention will last 6 months and will comprise 3 face-to-face and 4 telephone contacts, consisting of individual counselling aimed at increasing daily physical activity (PA) and improving dietary behaviour, and/or smoking cessation. Counselling will take place at the Occupational Health Service (OHS), and will be done according to motivational interviewing (MI). Additional written information about healthy lifestyle will also be provided to those in the intervention group. At baseline, after 6 and after 12 months, measurements will take place. Primary outcome variables will be the lifestyle behaviours of concern, i.e. daily PA, dietary intake, and smoking status. Secondary outcome variables will be body mass index (BMI), systolic and diastolic blood pressure, total and HDL blood cholesterol, Hba1c and cardio-respiratory fitness (CRF). Sickness absenteeism and cost-effectiveness will be assessed as well. Multilevel analysis will be performed to compare all outcome measures between the intervention group and the control group. Discussion By improving lifestyle, CVD risk may be lowered, yielding benefits for both employee and employer. If proven effective, this lifestyle intervention will be implemented on a larger scale within the Occupational Health Services in construction industry. Trial registration Current Controlled Trials ISRCTN60545588 PMID:18173844
NASA Astrophysics Data System (ADS)
Scarpato, D. J.
2016-02-01
Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed for; however, all too frequently, such challenges manifest themselves as "surprises" in the field. Common constructibility challenges can include drill hole deviation during drilling for controlled blasting; and, excavation slope instability arising from inconsistent perimeter control drilling. Drill hole deviation results from the cumulative effects from both drilling mechanics and rock mass conditions. Once a hole has initiated the deviation trajectory, it is difficult to rectify drill steel position. Although such challenges are not necessarily unique to shale, they are often exacerbated by weak, weathered and transversely isotropic nature of bedrock conditions. All too often, the working assumption is that shale is "soft" and easily excavatable; however, this blanket assumption can prove to be costly. This paper is intended to provide design professionals and contractors with the practical considerations needed to avoid the "surprises" associated with drill hole deviation, and minimize the potential for costly claims.
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
Optimizing and controlling earthmoving operations using spatial technologies
NASA Astrophysics Data System (ADS)
Alshibani, Adel
This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.
2013-12-01
such poor condition that it had to have major rehabilitation work performed. Work to fix the deteriorated tunnel cost $10 million more than had...originally been estimated.19 Corps officials on the Little Calumet project said during construction they encountered a former landfill along one portion
Operation CASTLE. Report of the Manager Santa Fe Operations. Extracted Version.
Nuclear explosion testing, *Test facilities, *Management planning and control, Pacific Ocean, Eniwetok Atoll, Bikini Atoll, Marshall Islands , Organizations, Construction, Operation, Management, Logistics support, Costs
The effect of accountable care organizations on oncology practice.
Shulman, Lawrence N
2014-01-01
Cancer care accounts for a significant portion of the rise in health care costs, and therefore, as national efforts escalate to control cost, cancer care will be a focus of concern. Cost increases in cancer care are related to many factors, including increasing cancer incidence in an aging population, the introduction of new high-cost therapeutics, and the high cost of end-of-life care. Accountable care organizations (ACOs) have been one of the major efforts directed at controlling health care costs. How cancer care will fit into the rubric of ACOs is not entirely clear but will certainly evolve over the coming years. The oncology profession has the opportunity to play a role in this evolution or could leave the evolution to others driving the process, such as the Centers for Medicare and Medicaid Services (CMS), private payers, and ACOs. Ideally all parties will work together to provide a construct for high-value, high-quality care for patients with cancer while contributing to cost control in overall health care.
Comparison of Navy and Private-Sector Construction Costs
1997-09-01
contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar
Low-Cost, High-Throughput Sequencing of DNA Assemblies Using a Highly Multiplexed Nextera Process.
Shapland, Elaine B; Holmes, Victor; Reeves, Christopher D; Sorokin, Elena; Durot, Maxime; Platt, Darren; Allen, Christopher; Dean, Jed; Serber, Zach; Newman, Jack; Chandran, Sunil
2015-07-17
In recent years, next-generation sequencing (NGS) technology has greatly reduced the cost of sequencing whole genomes, whereas the cost of sequence verification of plasmids via Sanger sequencing has remained high. Consequently, industrial-scale strain engineers either limit the number of designs or take short cuts in quality control. Here, we show that over 4000 plasmids can be completely sequenced in one Illumina MiSeq run for less than $3 each (15× coverage), which is a 20-fold reduction over using Sanger sequencing (2× coverage). We reduced the volume of the Nextera tagmentation reaction by 100-fold and developed an automated workflow to prepare thousands of samples for sequencing. We also developed software to track the samples and associated sequence data and to rapidly identify correctly assembled constructs having the fewest defects. As DNA synthesis and assembly become a centralized commodity, this NGS quality control (QC) process will be essential to groups operating high-throughput pipelines for DNA construction.
Hierarchical Control Using Networks Trained with Higher-Level Forward Models
Wayne, Greg; Abbott, L.F.
2015-01-01
We propose and develop a hierarchical approach to network control of complex tasks. In this approach, a low-level controller directs the activity of a “plant,” the system that performs the task. However, the low-level controller may only be able to solve fairly simple problems involving the plant. To accomplish more complex tasks, we introduce a higher-level controller that controls the lower-level controller. We use this system to direct an articulated truck to a specified location through an environment filled with static or moving obstacles. The final system consists of networks that have memorized associations between the sensory data they receive and the commands they issue. These networks are trained on a set of optimal associations that are generated by minimizing cost functions. Cost function minimization requires predicting the consequences of sequences of commands, which is achieved by constructing forward models, including a model of the lower-level controller. The forward models and cost minimization are only used during training, allowing the trained networks to respond rapidly. In general, the hierarchical approach can be extended to larger numbers of levels, dividing complex tasks into more manageable sub-tasks. The optimization procedure and the construction of the forward models and controllers can be performed in similar ways at each level of the hierarchy, which allows the system to be modified to perform other tasks, or to be extended for more complex tasks without retraining lower-levels. PMID:25058706
[Microcomputer control of a LED stimulus display device].
Ohmoto, S; Kikuchi, T; Kumada, T
1987-02-01
A visual stimulus display system controlled by a microcomputer was constructed at low cost. The system consists of a LED stimulus display device, a microcomputer, two interface boards, a pointing device (a "mouse") and two kinds of software. The first software package is written in BASIC. Its functions are: to construct stimulus patterns using the mouse, to construct letter patterns (alphabet, digit, symbols and Japanese letters--kanji, hiragana, katakana), to modify the patterns, to store the patterns on a floppy disc, to translate the patterns into integer data which are used to display the patterns in the second software. The second software package, written in BASIC and machine language, controls display of a sequence of stimulus patterns in predetermined time schedules in visual experiments.
Reduction of enteric infectious disease in rural China by providing deep-well tap water.
Wang, Z. S.; Shepard, D. S.; Zhu, Y. C.; Cash, R. A.; Zhao, R. J.; Zhu, Z. X.; Shen, F. M.
1989-01-01
Enteric infectious disease (EID), defined here as bacillary dysentery, viral hepatitis A, El Tor cholera, or acute watery diarrhoea, is an important public health problem in most developing countries. This study assessed the impact on EID of providing deep-well tap water (DWTW) through household taps in rural China. For this purpose, we compared the incidence of EID in six study villages (population, 10,290) in Qidong County that had DWTW with that in six control villages (population 9397) that had only surface water. Both the bacterial counts and chemical properties of the DWTW met established hygiene standards for drinking water. The incidence of EID in the study region was 38.6% lower than in the control region; however, the introduction of DWTW supplies did not significantly affect the incidence of bacillary dysentery. These results indicate that the construction and use of DWTW systems with household taps is associated with decreased incidences of El Tor cholera, viral hepatitis A, and acute watery diarrhoea. Since high construction costs have led many authorities to question the value of DWTW, we carried out a cost-benefit analysis of the programme. The cost of constructing a DWTW system averaged US $36,000 at 1983 prices, or US $10.50 per capita. The combined capital and operating costs of a DWTW system were US $1.46 per capita per annum over its 20-year estimated life. The benefits derived from reductions in cost of illness and savings in time to fetch water were 2.2 times the costs at present values Capital outlays were recouped in a 3.6-year payback period and the provision of DWTW proved highly beneficial in both economic and social terms. PMID:2501042
Solar power satellite system definition study, phase 2. Volume 2: Reference system description
NASA Technical Reports Server (NTRS)
1979-01-01
System descriptions and cost estimates for the reference system of the solar power satellite program are presented. The reference system is divided into five principal elements: the solar power satellites; space construction and support; space and ground transportation; ground receiving stations; and operations control. The program scenario and non-recurring costs are briefly described.
ERIC Educational Resources Information Center
Wendling, Wayne
This report is divided into four sections. Section 1 is a short discussion of the economic theory underlying the construction of the cost of education index and an example of how the index is calculated. Also presented are descriptions of the factors included in the statistical analysis to control for quality, quantity, and cost differences and…
7 CFR 1951.853 - Loan purposes for undisbursed RDLF loan funds from HHS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... but not be limited to: (i) Business acquisitions, construction, conversion, enlargement, repair... supplies. (iv) Pollution control and abatement. (v) Transportation services. (vi) Startup operating costs...
Estimating costs of sea lice control strategy in Norway.
Liu, Yajie; Bjelland, Hans Vanhauwaer
2014-12-01
This paper explores the costs of sea lice control strategies associated with salmon aquaculture at a farm level in Norway. Diseases can cause reduction in growth, low feed efficiency and market prices, increasing mortality rates, and expenditures on prevention and treatment measures. Aquaculture farms suffer the most direct and immediate economic losses from diseases. The goal of a control strategy is to minimize the total disease costs, including biological losses, and treatment costs while to maximize overall profit. Prevention and control strategies are required to eliminate or minimize the disease, while cost-effective disease control strategies at the fish farm level are designed to reduce the losses, and to enhance productivity and profitability. Thus, the goal can be achieved by integrating models of fish growth, sea lice dynamics and economic factors. A production function is first constructed to incorporate the effects of sea lice on production at a farm level, followed by a detailed cost analysis of several prevention and treatment strategies associated with sea lice in Norway. The results reveal that treatments are costly and treatment costs are very sensitive to treatment types used and timing of the treatment conducted. Applying treatment at an early growth stage is more economical than at a later stage. Copyright © 2014 Elsevier B.V. All rights reserved.
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
User costs as one of main advantages of precast concrete application in highway construction
NASA Astrophysics Data System (ADS)
Tomek, Radan
2017-09-01
Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.
Pollution control: utility ships adapt for spill cleanups
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-02-01
A practical and cost effective approach to oil spill cleanup is being undertaken by Dutch companies. The approach involves constructing and equipping multi-use ships for pollution control. Usually, these ships are maintained in another type of service and come into use for spill cleanup only when needed. The use of these ships in pollution control is discussed.
Ellis, Charles; Hardy, Rose Y; Lindrooth, Richard C
2017-05-15
To examine racial differences in healthcare utilization and costs for persons with aphasia (PWA) being treated in acute care hospitals in North Carolina (NC). NC Healthcare Cost and Utilization Project State Inpatient Database (HCUP-SID) data from 2011-2012 were analyzed to examine healthcare utilization and costs of care for stroke patients with aphasia. Analyses emphasized length of stay, charges and cost of general hospital services. Generalized linear models (GLM) were constructed to determine the impact of demographic characteristics, stroke/illness severity, and observed hospital characteristics on utilization and costs. Hospital fixed effects were included to yield within-hospital estimates of disparities. GLM models demonstrated that Blacks with aphasia experienced 1.9days longer lengths of stay compared to Whites with aphasia after controlling for demographic characteristics, 1.4days controlling for stroke/illness severity, 1.2days controlling for observed hospital characteristics, and ~1 extra day controlling for unobserved hospital characteristics. Similarly, Blacks accrued ~$2047 greater total costs compared to Whites after controlling for demographic characteristics, $1659 controlling for stroke/illness severity, $1338 controlling for observed hospital characteristics, and ~$1311 greater total costs after controlling for unobserved hospital characteristics. In the acute hospital setting, Blacks with aphasia utilize greater hospital services during longer hospitalizations and at substantially higher costs in the state of NC. A substantial portion of the adjusted difference was related to the hospital treating the patient. However, even after controlling for the hospital, the differences remained clinically and statistically significant. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki
This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.
Design of a Low-Cost Air Levitation System for Teaching Control Engineering.
Chacon, Jesus; Saenz, Jacobo; Torre, Luis de la; Diaz, Jose Manuel; Esquembre, Francisco
2017-10-12
Air levitation is the process by which an object is lifted without mechanical support in a stable position, by providing an upward force that counteracts the gravitational force exerted on the object. This work presents a low-cost lab implementation of an air levitation system, based on open solutions. The rapid dynamics makes it especially suitable for a control remote lab. Due to the system's nature, the design can be optimized and, with some precision trade-off, kept affordable both in cost and construction effort. It was designed to be easily adopted to be used as both a remote lab and as a hands-on lab.
Quality control in diagnostic immunohistochemistry: integrated on-slide positive controls.
Bragoni, A; Gambella, A; Pigozzi, S; Grigolini, M; Fiocca, R; Mastracci, L; Grillo, F
2017-11-01
Standardization in immunohistochemistry is a priority in modern pathology and requires strict quality control. Cost containment has also become fundamental and auditing of all procedures must take into account both these principles. Positive controls must be routinely performed so that their positivity guarantees the appropriateness of the immunohistochemical procedure. The aim of this study is to develop a low cost (utilizing a punch biopsy-PB-tool) procedure to construct positive controls which can be integrated in the patient's tissue slide. Sixteen frequently used control blocks were selected and multiple cylindrical samples were obtained using a 5-mm diameter punch biopsy tool, separately re-embedding them in single blocks. For each diagnostic immunoreaction requiring a positive control, an integrated PB-control section (cut from the appropriate PB-control block) was added to the top right corner of the diagnostic slide before immunostaining. This integrated control technique permitted a saving of 4.75% in total direct lab costs and proved to be technically feasible and reliable. Our proposal is easy to perform and within the reach of all pathology labs, requires easily available tools, its application costs is less than using external paired controls and ensures that a specific control for each slide is always available.
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2010 CFR
2010-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2014 CFR
2014-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2011 CFR
2011-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2012 CFR
2012-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2013 CFR
2013-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
Occupational injury costs and alternative employment in construction trades.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Men, Yurong; Haile, Elizabeth
2007-11-01
To present the costs of fatal and non-fatal days-away-from-work injuries in 50 construction occupations. Our results also provide indirect evidence on the cost exposure of alternative construction workers such as independent contractors, on-call or day labor, contract workers, and temporary workers. We combine data from the Bureau of Labor Statistics on average annual incidence from 2000 to 2002 with updated per-case costs from an existing cost model for occupational injuries. The Current Population Survey provides data on the percentage of alternative construction workers. Construction laborers and carpenters were the two costliest occupations, with 40% of the industry's injury costs. The 10 costliest construction occupations also have a high percentage of alternative workers. The construction industry has both a high rate of alternative employment and high costs of work injury. Alternative workers, often lacking workers' compensation, are especially exposed to injury costs.
NASA Technical Reports Server (NTRS)
Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.
1992-01-01
This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Optimal feedback control of turbulent channel flow
NASA Technical Reports Server (NTRS)
Bewley, Thomas; Choi, Haecheon; Temam, Roger; Moin, Parviz
1993-01-01
Feedback control equations were developed and tested for computing wall normal control velocities to control turbulent flow in a channel with the objective of reducing drag. The technique used is the minimization of a 'cost functional' which is constructed to represent some balance of the drag integrated over the wall and the net control effort. A distribution of wall velocities is found which minimizes this cost functional some time shortly in the future based on current observations of the flow near the wall. Preliminary direct numerical simulations of the scheme applied to turbulent channel flow indicates it provides approximately 17 percent drag reduction. The mechanism apparent when the scheme is applied to a simplified flow situation is also discussed.
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, H.J.
1978-01-01
This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
NASA Astrophysics Data System (ADS)
Gowda, Haarish Kapaninaikappa
Noise is defined as unwanted sound, when perceived in excess can cause many harmful effects such as annoyance, interference with speech, and hearing loss, hence there is a need to control noise in practical situations. Noise can be controlled actively and/or passively, here we discuss the passive noise control techniques. Passive noise control involves using energy dissipating or reflecting materials such as absorbers or barriers respectively. Damping and isolating materials are also used in eliminating structure-borne noise. These materials exhibit properties such as reflection, absorption and transmission loss when incidence is by a sound source. Thus, there is a need to characterize the acoustical properties of these materials for practical use. The theoretical background of the random incident sound absorption with reverberation room and normal incident sound absorption using impedance tube are well documented. The Transfer Matrix method for measuring transmission loss and absorption coefficient using impedance tube is very attractive since it is rather inexpensive and fast. In this research, a low-cost Impedance Tube is constructed using transfer function method to measure both absorption and transmissibility of materials. Equipment and measurement instruments available in the laboratory were used in the construction of the tube, adhering to cost-effectiveness. Care has been taken for precise construction of tube to ensure better measurement results. Further various samples varying from hard non-porous to soft porous materials were tested for absorption and sound transmission loss. Absorption values were also compared with reverberation room method with the available samples further ensuring the reliability of the newly constructed tube for future measurements.
Construction Project Management for RED HORSE Troop Training Projects
1989-02-02
estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters
Co-control of urban air pollutants and greenhouse gases in Mexico City.
West, J Jason; Osnaya, Patricia; Laguna, Israel; Martínez, Julia; Fernández, Adrián
2004-07-01
This study addresses the synergies of mitigation measures to control urban air pollutant and greenhouse gas (GHG) emissions, in developing integrated "co-control" strategies for Mexico City. First, existing studies of emissions reduction measures--PROAIRE (the air quality plan for Mexico City) and separate GHG studies--are used to construct a harmonized database of options. Second, linear programming (LP) is developed and applied as a decision-support tool to analyze least-cost strategies for meeting co-control targets for multiple pollutants. We estimate that implementing PROAIRE measures as planned will reduce 3.1% of the 2010 metropolitan CO2 emissions, in addition to substantial local air pollutant reductions. Applying the LP, PROAIRE emissions reductions can be met at a 20% lower cost, using only the PROAIRE measures, by adjusting investments toward the more cost-effective measures; lower net costs are possible by including cost-saving GHG mitigation measures, but with increased investment. When CO2 emission reduction targets are added to PROAIRE targets, the most cost-effective solutions use PROAIRE measures for the majority of local pollutant reductions, and GHG measures for additional CO2 control. Because of synergies, the integrated planning of urban-global co-control can be beneficial, but we estimate that for Mexico City these benefits are often small.
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Exploring the Deployment Potential of Small Modular Reactors
NASA Astrophysics Data System (ADS)
Abdulla, Ahmed Y.
This thesis reports the results of several investigations into the viability of an emergent technology. Due to the lack of data in such cases, and the sensitivity surrounding nuclear power, exploring the potential of small modular reactors (SMRs) proved challenging. Moreover, these reactors come in a wide range of sizes and can employ a number of technologies, which made investigating the category as a whole difficult. We started by looking at a subset of SMRs that were the most promising candidates for near to mid-term deployment: integral light water SMRs. We conducted a technically detailed elicitation of expert assessments of their capital costs and construction duration, focusing on five reactor deployment scenarios that involved a large reactor and two light water SMRs. Consistent with the uncertainty introduced by past cost overruns and construction delays, median estimates of the cost of new large plants varied by more than a factor of 2.5. Expert judgments about likely SMR costs displayed an even wider range. There was consensus that an SMR plant's construction duration would be shorter than a large reactor's. Experts identified more affordable unit cost, factory fabrication, and shorter construction schedules as factors that may make light water SMRs economically viable, though these reactors do not constitute a paradigm shift when it comes to nuclear power's safety and security. Using these expert assessments of cost and construction duration, we calculated levelized cost of electricity values for four of the five scenarios. For the large plant, median levelized cost estimates ranged from 56 to 120 per MWh. Median estimates of levelized cost ranged from 77 to 240 per MWh for a 45MWe SMR, and from 65 to 120 per MWh for a 225MWe unit. We concluded that controlling construction duration is important, though not as important a factor in the analysis as capital cost, and, given the price of electricity in some parts of the U.S., it is possible to construct an argument for deploying SMRs in certain locations. We then decided to investigate the technical and institutional barriers hampering the development and deployment of a subset of six SMRs, including two light water designs and four non-light water advanced designs. We organized an invitational workshop that became an integrated assessment of various designs and of the institutional innovations required to bring SMRs to market. Some valuable insights were gleaned from the workshop: there is consensus that many of the challenges facing advanced SMRs are rooted in institutional biases in favor of the light water economy, as opposed to technical ones. The institutional factors that are judged to pose the greatest challenge to the mass deployment of SMRs are: the lack of a greenhouse gas control regime; political and financial instability; public concerns about nuclear safety and waste; and inadequate national and international institutions. When asked what factors most help promote SMR adoption in OECD and developing countries, economic factors dominate the list of characteristics that most contribute to their promotion in OECD countries but, when it comes to developing countries, institutional factors are regarded as being of highest import. Safety of design and safety in operation are judged the most important characteristic on both lists.
Costs of occupational injuries in construction in the United States.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong
2007-11-01
This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.
Ahuachapan geothermal project: a technical and economic assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bloomster, C.H.; DiPippo; Kuwada, J.T.
Theeconomic and technical factors involved in using geothermal energy at Ahuachapan are examined. The experience at Ahuachapan is evaluated in relation to conditions prevailing in El Salvador and to conditions in the U.S. technical characteristics considered are: geological characteristics, well programs and gathering system, well productivity and geofluid characteristics, and energy conversion systems. Economic factors considered for El Salvador are: construction costs; environmental control costs; operating experience and costs; financing; taxes, subsidies, or incentives; marketing; and electrical system characteristics. (MHR)
A Decision Support System for Planning, Control and Auditing of DoD Software Cost Estimation.
1986-03-01
is frequently used in U. S. Air Force software cost estimates. Barry Boehm’s Constructive Cost Estimation Model (COCOMO) was recently selected for use...are considered basic to the proper development of software. Pressman , [Ref. 11], addresses these basic elements in a manner which attempts to integrate...H., Jr., and Carlson, Eric D., Building E fective Decision SUDDOrt Systems, Prentice-Hal, EnglewoodNJ, 1982 11. Pressman , Roger S., o A Practioner’s A
Clinical process analysis and activity-based costing at a heart center.
Ridderstolpe, Lisa; Johansson, Andreas; Skau, Tommy; Rutberg, Hans; Ahlfeldt, Hans
2002-08-01
Cost studies, productivity, efficiency, and quality of care measures, the links between resources and patient outcomes, are fundamental issues for hospital management today. This paper describes the implementation of a model for process analysis and activity-based costing (ABC)/management at a Heart Center in Sweden as a tool for administrative cost information, strategic decision-making, quality improvement, and cost reduction. A commercial software package (QPR) containing two interrelated parts, "ProcessGuide and CostControl," was used. All processes at the Heart Center were mapped and graphically outlined. Processes and activities such as health care procedures, research, and education were identified together with their causal relationship to costs and products/services. The construction of the ABC model in CostControl was time-consuming. However, after the ABC/management system was created, it opened the way for new possibilities including process and activity analysis, simulation, and price calculations. Cost analysis showed large variations in the cost obtained for individual patients undergoing coronary artery bypass grafting (CABG) surgery. We conclude that a process-based costing system is applicable and has the potential to be useful in hospital management.
Howard, Charla L; Wallace, Chris; Abbas, James; Stokic, Dobrivoje S
2017-01-01
We developed and evaluated properties of a new measure of variability in stride length and cadence, termed residual standard deviation (RSD). To calculate RSD, stride length and cadence are regressed against velocity to derive the best fit line from which the variability (SD) of the distance between the actual and predicted data points is calculated. We examined construct, concurrent, and discriminative validity of RSD using dual-task paradigm in 14 below-knee prosthesis users and 13 age- and education-matched controls. Subjects walked first over an electronic walkway while performing separately a serial subtraction and backwards spelling task, and then at self-selected slow, normal, and fast speeds used to derive the best fit line for stride length and cadence against velocity. Construct validity was demonstrated by significantly greater increase in RSD during dual-task gait in prosthesis users than controls (group-by-condition interaction, stride length p=0.0006, cadence p=0.009). Concurrent validity was established against coefficient of variation (CV) by moderate-to-high correlations (r=0.50-0.87) between dual-task cost RSD and dual-task cost CV for both stride length and cadence in prosthesis users and controls. Discriminative validity was documented by the ability of dual-task cost calculated from RSD to effectively differentiate prosthesis users from controls (area under the receiver operating characteristic curve, stride length 0.863, p=0.001, cadence 0.808, p=0.007), which was better than the ability of dual-task cost CV (0.692, 0.648, respectively, not significant). These results validate RSD as a new measure of variability in below-knee prosthesis users. Future studies should include larger cohorts and other populations to ascertain its generalizability. Copyright © 2016 Elsevier B.V. All rights reserved.
A STUDY ON THE HIERARCHY OF MANAGEMENT ELEMENTS
NASA Astrophysics Data System (ADS)
Suzuki, Nobuyuki; Watanabe, Tadashi
Compared to the late 20th century, the Japanese construction industry has drastically changed its business methodology, outlook and approach in response to global issues and the incredible advances in technology. Such influences, non-exhaustively include the; WTO Government procurement agreement, updating conditions of tendering and contracting, client demands for cost reduction and the rapid penetration of ICT (Information and Communication Technology) into modern society. These days, the significance of controlling Quality, Cost and Time (the so-called QCT) has been recognized as an eternal-triangle by almost all countries, Government organizations and the private sector. However, as the construction industry is exposed to , and influenced by, more and more internal and external dynamic factors, continued reliance on managing and controlling QCT elements on their own is no longer adequate in meeting the growing demands and expectations, and as such control of additional management elements is now essential to avoid problems, or minimize their potential impacts should they occur. This paper utilizes the results of a survey carried out amongst construction managers and consultants in Japan and overseas to develop a spatial network that defines the interaction of management factors as a weighted graphical model. The calculated closeness centrality index of the developed management network model is adopted to identify the initialelement hierarchy, which is then further analyzed using the minimum distance of independent relationships of management elements (Warshall-Floyd algorism methodology), to identify the optimum potential hierarchy for effective construction management. A key result of the analysis is the significance of "Human Resource" in the construction industry management element hierarchy alongside the traditional QCT elements.
NASA Astrophysics Data System (ADS)
Fang, Yingcui; Wu, Qingmeng; Li, Huanhuan; Zhang, Bing; Yan, Rong; Chen, Junling; Sun, Mengtao
2018-04-01
We construct a kind of structure of silver oxide capped silver nanoparticles (AgNPs) by cost-efficient air plasma irradiation, and study its visible-light driven photocatalytic activity (PA). By controlling the oxidization time, the relationship between the intensity of the localized surface plasmon resonance (LSPR) and the PA is well established. The PA reaches the maximum when the LSPR of AgNPs is nearly completely damped (according to absorption spectra); however, under this condition, the LSPR still works, confirmed with the high efficient selective transformation of p-Aminothiophenol (PATP) to p, p'-dimercaptoazobenzene (DMAB) under visible light. The mechanism of the LSPR damping induced PA improvement is discussed. We not only provide a cost-efficient approach to construct a LSPR strong damping structure but also promote the understanding of LSPR strong damping and its relationship with photocatalysis.
Boosting a Low-Cost Smart Home Environment with Usage and Access Control Rules.
Barsocchi, Paolo; Calabrò, Antonello; Ferro, Erina; Gennaro, Claudio; Marchetti, Eda; Vairo, Claudio
2018-06-08
Smart Home has gained widespread attention due to its flexible integration into everyday life. Pervasive sensing technologies are used to recognize and track the activities that people perform during the day, and to allow communication and cooperation of physical objects. Usually, the available infrastructures and applications leveraging these smart environments have a critical impact on the overall cost of the Smart Home construction, require to be preferably installed during the home construction and are still not user-centric. In this paper, we propose a low cost, easy to install, user-friendly, dynamic and flexible infrastructure able to perform runtime resources management by decoupling the different levels of control rules. The basic idea relies on the usage of off-the-shelf sensors and technologies to guarantee the regular exchange of critical information, without the necessity from the user to develop accurate models for managing resources or regulating their access/usage. This allows us to simplify the continuous updating and improvement, to reduce the maintenance effort and to improve residents’ living and security. A first validation of the proposed infrastructure on a case study is also presented.
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
Design of a Low-Cost Air Levitation System for Teaching Control Engineering
Chacon, Jesus; Saenz, Jacobo; de la Torre, Luis; Diaz, Jose Manuel; Esquembre, Francisco
2017-01-01
Air levitation is the process by which an object is lifted without mechanical support in a stable position, by providing an upward force that counteracts the gravitational force exerted on the object. This work presents a low-cost lab implementation of an air levitation system, based on open solutions. The rapid dynamics makes it especially suitable for a control remote lab. Due to the system’s nature, the design can be optimized and, with some precision trade-off, kept affordable both in cost and construction effort. It was designed to be easily adopted to be used as both a remote lab and as a hands-on lab. PMID:29023381
Local Probing Spinel and Perovskite Complex Magnetic Systems
NASA Astrophysics Data System (ADS)
Oliveira, Goncalo Nuno de Pinho
Noise is defined as unwanted sound, when perceived in excess can cause many harmful effects such as annoyance, interference with speech, and hearing loss, hence there is a need to control noise in practical situations. Noise can be controlled actively and/or passively, here we discuss the passive noise control techniques. Passive noise control involves using energy dissipating or reflecting materials such as absorbers or barriers respectively. Damping and isolating materials are also used in eliminating structure-borne noise. These materials exhibit properties such as reflection, absorption and transmission loss when incidence is by a sound source. Thus, there is a need to characterize the acoustical properties of these materials for practical use. The theoretical background of the random incident sound absorption with reverberation room and normal incident sound absorption using impedance tube are well documented. The Transfer Matrix method for measuring transmission loss and absorption coefficient using impedance tube is very attractive since it is rather inexpensive and fast. In this research, a low-cost Impedance Tube is constructed using transfer function method to measure both absorption and transmissibility of materials. Equipment and measurement instruments available in the laboratory were used in the construction of the tube, adhering to cost-effectiveness. Care has been taken for precise construction of tube to ensure better measurement results. Further various samples varying from hard non-porous to soft porous materials were tested for absorption and sound transmission loss. Absorption values were also compared with reverberation room method with the available samples further ensuring the reliability of the newly constructed tube for future measurements.
Fleetcroft, Robert; Schofield, Peter; Duerden, Martin; Ashworth, Mark
2012-12-01
There is conflicting evidence as to whether achievement of cholesterol targets at the population level is dependent on the choice and cost of statin. To investigate the practice-level relationship between cholesterol quality indicators in patients with heart disease, stroke, and diabetes and prescribing of low-cost statins. Correlations and linear regression modelling of retrospective cross-sectional practice-level data with potential explanatory variables in 7909 (96.4%) general practices in England in 2008-2009. Quality indicator data were obtained from the Information Centre and prescribing data from the NHS Business Authority. A 'cholesterol quality indicator' score was constructed by dividing the numbers of patients achieving the target for cholesterol control of ≤5 mmol/l in stroke, diabetes, and heart disease by the numbers on each register. A 'low-cost statin' ratio score was constructed by dividing the numbers of defined daily doses of simvastatin and pravastatin by the total numbers of defined daily doses of statins. Simvastatin accounted for 83.3% (standard deviation [SD] = 15.7%) of low-cost statins prescribed and atorvastatin accounted for 85.7% (SD = 14.8%) of high-cost statins prescribed. The mean cholesterol score was 73.7% (SD = 6.0%). Practices using a higher proportion of the low-cost statins were less successful in achieving cholesterol targets. An increase of 10% in the prescribing of low-cost statins was associated with a decrease of 0.46% in the cholesterol quality indicator score (95% confidence interval = -0.54% to -0.38%, P<0.001). Greater use of low-cost statins was associated with a small reduction in cholesterol control.
Optimal consensus algorithm integrated with obstacle avoidance
NASA Astrophysics Data System (ADS)
Wang, Jianan; Xin, Ming
2013-01-01
This article proposes a new consensus algorithm for the networked single-integrator systems in an obstacle-laden environment. A novel optimal control approach is utilised to achieve not only multi-agent consensus but also obstacle avoidance capability with minimised control efforts. Three cost functional components are defined to fulfil the respective tasks. In particular, an innovative nonquadratic obstacle avoidance cost function is constructed from an inverse optimal control perspective. The other two components are designed to ensure consensus and constrain the control effort. The asymptotic stability and optimality are proven. In addition, the distributed and analytical optimal control law only requires local information based on the communication topology to guarantee the proposed behaviours, rather than all agents' information. The consensus and obstacle avoidance are validated through simulations.
Naing, Cho; Poovorawan, Yong; Mak, Joon Wah; Aung, Kyan; Kamolratankul, Pirom
2015-06-01
The present study aimed to assess the cost-utility analysis of using an adjunctive recombinant activated factor VIIa (rFVIIa) in children for controlling life-threatening bleeding in dengue haemorrhagic fever (DHF)/dengue shock syndrome (DSS). We constructed a decision-tree model, comparing a standard care and the use of an additional adjuvant rFVIIa for controlling life-threatening bleeding in children with DHF/DSS. Cost and utility benefit were estimated from the societal perspective. The outcome measure was cost per quality-adjusted life years (QALYs). Overall, treatment with adjuvant rFVIIa gained QALYs, but the total cost was higher. The incremental cost-utility ratio for the introduction of adjuvant rFVIIa was $4241.27 per additional QALY. Sensitivity analyses showed the utility value assigned for calculation of QALY was the most sensitive parameter. We concluded that despite high cost, there is a role for rFVIIa in the treatment of life-threatening bleeding in patients with DHF/DSS.
Construction cost forecast model : model documentation and technical notes.
DOT National Transportation Integrated Search
2013-05-01
Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...
Trends in highway construction costs in Louisiana : technical summary.
DOT National Transportation Integrated Search
1999-09-01
The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...
Personal Computer Based Controller For Switched Reluctance Motor Drives
NASA Astrophysics Data System (ADS)
Mang, X.; Krishnan, R.; Adkar, S.; Chandramouli, G.
1987-10-01
Th9, switched reluctance motor (SRM) has recently gained considerable attention in the variable speed drive market. Two important factors that have contributed to this are, the simplicity of construction and the possibility of developing low cost con-trollers with minimum number of switching devices in the drive circuits. This is mainly due to the state-of-art of the present digital circuits technology and the low cost of switching devices. The control of this motor drive is under research. Optimized performance of the SRM motor drive is very dependent on the integration of the controller, converter and the motor. This research on system integration involves considerable changes in the control algorithms and their implementation. A Personal computer (PC) based controller is very appropriate for this purpose. Accordingly, the present paper is concerned with the design of a PC based controller for a SRM. The PC allows for real-time microprocessor control with the possibility of on-line system parameter modifications. Software reconfiguration of this controller is easier than a hardware based controller. User friendliness is a natural consequence of such a system. Considering the low cost of PCs, this controller will offer an excellent cost-effective means of studying the control strategies for the SRM drive intop greater detail than in the past.
Costs of Occupational Injuries in Construction in the United States
Waehrer, Geetha M.; Dong, Xiuwen S.; Miller, Ted; Haile, Elizabeth; Men, Yurong
2008-01-01
This paper presents costs of fatal and non-fatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and non-fatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry’s total fatal and non-fatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs. PMID:17920850
NASA Astrophysics Data System (ADS)
Mizhidon, A. D.; Mizhidon, K. A.
2017-04-01
An analytic-numerical method for the construction of a reference law of operation for a class of dynamic systems describing vibrations in controlled mechanical systems is proposed. By the reference law of operation of a system, we mean a law of the system motion that satisfies all the requirements for the quality and design features of the system under permanent external disturbances. As disturbances, we consider polyharmonic functions with known amplitudes and frequencies of the harmonics but unknown initial phases. For constructing the reference law of motion, an auxiliary optimal control problem is solved in which the cost function depends on a weighting coefficient. The choice of the weighting coefficient ensures the design of the reference law. Theoretical foundations of the proposed method are given.
48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...
van der Molen, Henk F; den Herder, Aalt; Warning, Jan; Frings-Dresen, Monique H W
2016-01-09
The objective of this study is to evaluate the effectiveness of a face-to-face strategy and a direct mail strategy on safety violations while working from heights among construction companies compared to a control condition. Construction companies with workers at risk for fall injuries were eligible for this three-armed randomized controlled trial. In total, 27 cities were randomly assigned to intervention groups-where eligible companies were given either a face-to-face guidance strategy or a direct mailing strategy with access to internet facilities-or to a control group. The primary outcomes were the number and type of safety violations recorded by labor inspectors after three months. A process evaluation for both strategies was performed to determine reach, program implementation, satisfaction, knowledge and perceived safety behavior. A cost analysis was performed to establish the financial costs for each intervention strategy. Analyses were done by intention to treat. In total, 41% (n = 88) of the companies eligible for the face-to-face intervention participated and 73% (n = 69) for direct mail. Intervention materials were delivered to 69 % (face-to-face group) and 100 % (direct mail group); completion of intervention activities within companies was low. Satisfaction, increase in knowledge, and safety behavior did not differ between the intervention groups. Costs for personal advice were 28% higher than for direct mail. Ultimately, nine intervention companies were captured in the 288 worksite measurements performed by the labor inspectorate. No statistical differences in mean number of safety violations (1.8-2.4) or penalties (72%-100%) were found between the intervention and control groups based on all worksite inspections. No conclusions about the effect of face-to-face and direct mail strategies on safety violations could be drawn due to the limited number of intervention companies captured in the primary outcome measurements. The costs for a face-to-face strategy are higher compared with a direct mail strategy. No difference in awareness and attitude for safe working was found between employers and workers between both strategies. NTR 4298 on 29-Nov-2013.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...
Rapid replacement/construction of bridges.
DOT National Transportation Integrated Search
2012-11-01
Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...
Sculpher, M J; Buxton, M J
1993-11-01
The construction of a composite effectiveness measure was explored using clinical data collected routinely in trials of drug therapies for asthma. The measure is the episode-free day (EFD), where an 'episode' is either an asthma attack, the need for rescue medication, sleep disturbance caused by asthma, or an adverse event. The EFD measure was used in a retrospective cost-effectiveness analysis of a previous Phase III controlled clinical trial of formoterol versus salbutamol, in which 145 patients with bronchial asthma were randomised to receive maintenance therapy with either inhaled formoterol or inhaled salbutamol over a 12-week period. Average and incremental cost-effectiveness ratios were assessed for the 2 drugs in terms of the total expected cost of drug plus rescue therapy, and EFD rates. The analysis suggests that, with relatively little addition to clinical data collection, economically and clinically meaningful composite measures can be constructed to assist in making cost-effectiveness comparisons between alternative asthma therapies.
Investigating Outfitting Density as a Cost Driver in Submarine Construction
2015-09-01
Outfitting and furnishings, such as offices, medical, stores, berthing , joiner work and paint are allocated 12 to group 600. Group 700 is armament...handling, fire control, steering 600 Outfit and Furnishings Hull fittings, paint, insulation, berthing , offices, storerooms, medical 700 Armament...and is allocated for the service-life of the submarine. The AWE serves as the baseline weight for the Milestone B costing position for projected
A Systems Approach to Military Construction.
1982-11-01
Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a
Space construction system analysis. Part 2: Cost and programmatics
NASA Technical Reports Server (NTRS)
Vonflue, F. W.; Cooper, W.
1980-01-01
Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false What Indian Self-Determination Act provisions apply to... Self-Determination Act provisions apply to grants under the Tribally Controlled Schools Act? (a) The... administrative cost grant; (4) Any dispute regarding new construction or facility improvement or repair; or (5...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false What Indian Self-Determination Act provisions apply to... Self-Determination Act provisions apply to grants under the Tribally Controlled Schools Act? (a) The... administrative cost grant; (4) Any dispute regarding new construction or facility improvement or repair; or (5...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true What Indian Self-Determination Act provisions apply to... Self-Determination Act provisions apply to grants under the Tribally Controlled Schools Act? (a) The... administrative cost grant; (4) Any dispute regarding new construction or facility improvement or repair; or (5...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false What Indian Self-Determination Act provisions apply to... Self-Determination Act provisions apply to grants under the Tribally Controlled Schools Act? (a) The... administrative cost grant; (4) Any dispute regarding new construction or facility improvement or repair; or (5...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What Indian Self-Determination Act provisions apply to... Self-Determination Act provisions apply to grants under the Tribally Controlled Schools Act? (a) The... administrative cost grant; (4) Any dispute regarding new construction or facility improvement or repair; or (5...
Murphy, Colin W; Parker, Nathan C
2014-02-18
Air pollution emissions regulation can affect the location, size, and technology choice of potential biofuel production facilities. Difficulty in obtaining air pollutant emission permits and the cost of air pollution control devices have been cited by some fuel producers as barriers to development. This paper expands on the Geospatial Bioenergy Systems Model (GBSM) to evaluate the effect of air pollution control costs on the availability, cost, and distribution of U.S. biofuel production by subjecting potential facility locations within U.S. Clean Air Act nonattainment areas, which exceed thresholds for healthy air quality, to additional costs. This paper compares three scenarios: one with air quality costs included, one without air quality costs, and one in which conversion facilities were prohibited in Clean Air Act nonattainment areas. While air quality regulation may substantially affect local decisions regarding siting or technology choices, their effect on the system as a whole is small. Most biofuel facilities are expected to be sited near to feedstock supplies, which are seldom in nonattainment areas. The average cost per unit of produced energy is less than 1% higher in the scenarios with air quality compliance costs than in scenarios without such costs. When facility construction is prohibited in nonattainment areas, the costs increase by slightly over 1%, due to increases in the distance feedstock is transported to facilities in attainment areas.
Optimizing the construction of devices to control inaccesible surfaces - case study
NASA Astrophysics Data System (ADS)
Niţu, E. L.; Costea, A.; Iordache, M. D.; Rizea, A. D.; Babă, Al
2017-10-01
The modern concept for the evolution of manufacturing systems requires multi-criteria optimization of technological processes and equipments, prioritizing associated criteria according to their importance. Technological preparation of the manufacturing can be developed, depending on the volume of production, to the limit of favourable economical effects related to the recovery of the costs for the design and execution of the technological equipment. Devices, as subsystems of the technological system, in the general context of modernization and diversification of machines, tools, semi-finished products and drives, are made in a multitude of constructive variants, which in many cases do not allow their identification, study and improvement. This paper presents a case study in which the multi-criteria analysis of some structures, based on a general optimization method, of novelty character, is used in order to determine the optimal construction variant of a control device. The rational construction of the control device confirms that the optimization method and the proposed calculation methods are correct and determine a different system configuration, new features and functions, and a specific method of working to control inaccessible surfaces.
Highway Cost Index Estimator Tool
DOT National Transportation Integrated Search
2017-10-01
To plan and program highway construction projects, the Texas Department of Transportation requires accurate construction cost data. However, due to the number of, and uncertainty of, variables that affect highway construction costs, estimating future...
Li, Shui-Ming; Chen, Shi-Jun; Wu, Xiao-Jun; Chen, Xi-Qing; Zhang, Rong-Ping; Zhang, Jian-Rong
2011-02-01
To evaluate the cost-effectiveness of the snail control project by environmental modification in order to provide the evidence for quickly interrupting the transmission of schistosomiasis in hilly regions. Field investigations were carried out. The changes of the snail habitat areas were compared before and after the snail control project. The direct costs of the snail control were calculated. The reduction rates of snail area and snail density were regarded as the evaluation indexes of the effectiveness. The costs for reduction of 1% of snail area and 1% of snail density were used as the unit for cost-effectiveness analysis. After the 15 projects were implemented, there were no snails in 12 areas. The reduction rates of snail areas were 72.22% to 100%. The reduction rates of the snail area and density were both 100% in the areas with digging new ditches to fill up the old ones and building reservoirs. The total cost of 15 projects was 1 450 800 Yuan. The average cost per unit was 0.56 Yuan/m2. After the snail control project by digging new ditches to fill up the old ones was implemented, the costs of snail area and density decreased by one unit were 300 -700 Yuan, by building reservoirs, the costs were 600 -2 600 Yuan, by building fishpond, the costs were 1 200 - 1 500 Yuan, by watershed comprehensive measures, the costs were 900 - 2 700 Yuan. The cost of digging new ditches to fill up the old ones was significantly lower than that of building reservoirs or watershed comprehensive measures, but there was no significant difference between building reservoirs and watershed comprehensive measures. In hilly regions, the implementation of snail control project by environmental modification combined with construction of water conservancy is effective, and the cost-effectiveness of the snail control with digging new ditches to fill up the old ones is excellent.
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...
Advanced composites for windmills
NASA Astrophysics Data System (ADS)
Bourquardez, G.
A development status assessment is conducted for advanced composite construction techniques for windmill blade structures which, as in the case of composite helicopter rotors, promise greater reliability, longer service life, superior performance, and lower costs. Composites in wind turbine applications must bear aerodynamic, inertial and gravitational loads in complex interaction cycles. Attention is given to large Darrieus-type vertical axis windmills, to which composite construction methods may offer highly effective pitch-control mechanisms, especially in the 'umbrella' configuration.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of existing improvements, the estimated cost of the proposed construction, attitude of the local representative of the department or agency having control, and such other items as are necessary to give full...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of existing improvements, the estimated cost of the proposed construction, attitude of the local representative of the department or agency having control, and such other items as are necessary to give full...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of existing improvements, the estimated cost of the proposed construction, attitude of the local representative of the department or agency having control, and such other items as are necessary to give full...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of existing improvements, the estimated cost of the proposed construction, attitude of the local representative of the department or agency having control, and such other items as are necessary to give full...
Code of Federal Regulations, 2014 CFR
2014-07-01
... of existing improvements, the estimated cost of the proposed construction, attitude of the local representative of the department or agency having control, and such other items as are necessary to give full...
Systems Analysis of Rapid Transit Underground Construction : Volume 2. Sections 6-9 and Appendixes.
DOT National Transportation Integrated Search
1974-12-01
Three San Francisco Bay Area Rapid Transit (BART) projects and two Washington Metropolitan Area Transit Authority (WMATA) projects are analyzed with respect to time schedules, costs, and sensitivity to physical and institutional controls. These data ...
El-Naggar, Hesham M
2010-01-01
The main activity in Siwa Oasis society is the agriculture, it depends on the groundwater. The agricultural drainage water and the unused saline water of naturally flowing springs are poured into four main salty lakes. This leads to an increase in the surface area of the saltwater lakes, marshes and rise in water table levels. to investigate some environmental engineering interventions to control the expansion of saltwater surface area in Siwa Oasis. Field visits, observation sheets and questionnaire survey with farmers were carried out to find out the main environmental problems in the Oasis. Environmental survey was carried out to collect different rocks and stones samples as natural construction materials from the desert that surrounds Siwa Oasis. Physical analyses, chemical composition and principal mechanical parameters were conducted on the collected samples. After the analysis, the safa rocks were the best natural construction materials in the Siwa Oasis. So, it could be used to build a construction wall around the salty lakes and marshes. Walls could convert the lakes into basins. The water will be evaporated at high rate during summer season by solar energy. After evaporation, the remaining salty rock named "karshef" can be easily collected from the lakes to be used as a low cost construction material for traditional building houses in Siwa Oasis. Therefore, the water level of lakes will be reduced to dryness and land could be reused as agricultural land. Among different rocks, safa rocks proved to be the best natural construction materials to construct a defense wall around the lakes and marshes. They will save about 80% of the concrete cost. The formed karshef rocks from the lakes will be used in the construction of the traditional building houses which will save about 90% of the concrete buildings. This intervention will save energy as it exchanges fuel consuming man-made material such as cement with naturally made material. This can reduce the green house gases generated from the cement industry. Economical feasibility study should be carried out to estimate the capital cost for the retaining wall.
Simple evaporation controller for thin-film deposition from a resistively heated boat
NASA Technical Reports Server (NTRS)
Scofield, John H.; Bajuk, Lou; Mohler, William
1990-01-01
A simple, inexpensive circuit is described for switching the current through a resistively heated evaporation boat during thin-film deposition. The circuit uses a silicon-controlled rectifier (SCR) to switch the 0-15-A current in the primary of a 2-kV A step-down transformer that supplies the 0-200-A current to an evaporation boat. The circuit is controlled by a 0-10 V-dc signal similar to that furnished by an Inficon XTC deposition-rate controller. This circuit may be assembled from a handful of parts for a cost of about $400, nearly one-tenth the cost of similar commercial units. Minimum construction is required, since the circuit is built around an off-the-shelf, self-contained SCR unit.
C/SCSC overview: approach, implementation, use. [Cost/Schedule Control Systems Criteria
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turf, Larry
1979-01-01
An overview of the Cost/Schedule Control System Criteria, known as C/SCS or C/S Squared is pesented. In the mid-1960s, several DOD service agencies embarked on a new performance measurement concept to track cost and schedule performance on major DOD programs. The performance measurement concept of C/SCS has expanded from DOD use to the Department of Energy (PMS), NASA (533 reports), and private industry such as shipbuilding, utilities, and construction. This paper describes the C/SCSC with the events leading to the C/SCS requirement, how to approach the requirement, and discusses implementing and using the system. Many government publications, directives, and instructionsmore » on the subject are listed in the publication.« less
Environmental trade-offs of tunnels vs cut-and-cover subways
Walton, M.
1978-01-01
Heavy construction projects in cities entail two kinds of cost - internal cost, which can be defined in terms of payments from one set of parties to another, and external cost, which is the cost borne by the community at large as the result of disutilities entailed in construction and operation. Environmental trade-offs involve external costs, which are commonly difficult to measure. Cut-and-cover subway construction probably entails higher external and internal cost than deep tunnel construction in many urban geological environments, but uncertainty concerning the costs and environmental trade-offs of tunneling leads to limited and timid use of tunneling by American designers. Thus uncertainty becomes a major trade-off which works against tunneling. The reverse is true in Sweden after nearly 30 years of subway construction. Econometric methods for measuring external costs exist in principle, but are limited in application. Economic theory based on market pressure does not address the real problem of urban environmental trade-offs. Nevertheless, the problem of uncertainty can be addressed by comparative studies of estimated and as-built costs of cut-and-cover vs tunnel projects and a review of environmental issues associated with such construction. Such a study would benefit the underground construction industry and the design of transportation systems. It would also help solve an aspect of the urban problem. ?? 1978.
Oil and gas pipeline construction cost analysis and developing regression models for cost estimation
NASA Astrophysics Data System (ADS)
Thaduri, Ravi Kiran
In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.
Assessing administrative costs of mental health and substance abuse services.
Broyles, Robert W; Narine, Lutchmie; Robertson, Madeline J
2004-05-01
Increasing competition in the market for mental health and substance abuse MHSA services and the potential to realize significant administrative savings have created an imperative to monitor, evaluate, and control spending on administrative functions. This paper develops a generic model that evaluates spending on administrative personnel by a group of providers. The precision of the model is demonstrated by examining a set of data assembled from five MHSA service providers. The model examines a differential cost construction derived from inter-facility comparisons of administrative expenses. After controlling for the scale of operations, the results enable MHSA programs to control the efficiency of administrative personnel and related rates of compensation. The results indicate that the efficiency of using the administrative complement and the scale of operations represent the lion's share of the total differential cost. The analysis also indicates that a modest improvement in the use of administrative personnel results in substantial cost savings, an increase in the net cash flow derived from operations, an improvement in the fiscal performance of the provider, and a decline in opportunity costs that assume the form of foregone direct patient care.
Belowground advantages in construction cost facilitate a cryptic plant invasion
Caplan, Joshua S.; Wheaton, Christine N.; Mozdzer, Thomas J.
2014-01-01
The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. PMID:24938305
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
Space construction base support requirements for environmental control and life support systems
NASA Technical Reports Server (NTRS)
Thiele, R. J.; Secord, T. C.; Murphy, G. L.
1977-01-01
A Space Station analysis study is being performed for NASA which identifies cost-effective Space Station options that can provide a space facility capable of performing space construction, space manufacturing, cosmological research, earth services, and other functions. A space construction base concept for the construction of large structures, such as those needed to implement satellite solar power for earth usage, will be used as a basis for discussing requirements that impact the design selection, level of integration, and operation of environmental control and life support systems (ECLSS). The space construction base configuration also provides a basic Space Station facility that can accommodate biological manufacturing modules, ultrapure glasses manufacturing modules, and modules for other services in a building-block fashion. Examples of special problems that could dictate hardware required to augment the basic ECLSS for autonomous modules will be highlighted. Additionally, overall intravehicular (IVA) and extravehicular (EVA) activities and requirements that could impact the basic station ECLSS degree of closure are discussed.
NASA Astrophysics Data System (ADS)
Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda
2018-03-01
The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.
Processing Control Information in a Nominal Control Construction: An Eye-Tracking Study.
Kwon, Nayoung; Sturt, Patrick
2016-08-01
In an eye-tracking experiment, we examined the processing of the nominal control construction. Participants' eye-movements were monitored while they read sentences that included either giver control nominals (e.g. promise in Luke's promise to Sophia to photograph himself) or recipient control nominals (e.g. plea in Luke's plea to Sophia to photograph herself). In order to examine both the initial access of control information, and its later use in on-line processing, we combined a manipulation of nominal control with a gender match/mismatch paradigm. Results showed that there was evidence of processing difficulty for giver control sentences (relative to recipient control sentences) at the point where the control dependency was initially created, suggesting that control information was accessed during the early parsing stages. This effect is attributed to a recency preference in the formation of control dependencies; the parser prefers to assign a recent antecedent to PRO. In addition, readers slowed down after reading a reflexive pronoun that mismatched with the gender of the antecedent indicated by the control nominal (e.g. Luke's promise to Sophia to photograph herself). The mismatch cost suggests that control information of the nominal control construction was used to constrain dependency formation involving a controller, PRO and a reflexive, confirming the use of control information in on-line interpretation.
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
Larkin, Howard
2011-10-01
With the nation's health care payment system on the verge of a dramatic overhaul and the cost of everything from workforce to construction continuing to climb, hospitals are experimenting with ways to control expenses. This cover article launches our yearlong Fiscal Fitness series on smart money management.
ERIC Educational Resources Information Center
Sievers, Dennis, Ed.
1986-01-01
Describes apparatus for use in high school chemistry instruction. Provides instructions and lists of materials needed for building a homemade sand bath for use in experiments that demonstrate the slow evaporation of a solvent. Plans for the construction of a low-cost conductivity apparatus are also included. (TW)
Code of Federal Regulations, 2010 CFR
2010-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2011 CFR
2011-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2014 CFR
2014-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2012 CFR
2012-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2013 CFR
2013-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
NASA Astrophysics Data System (ADS)
Yang, Huiming; Hu, Liangping
2017-05-01
In order to study the coalbed gas drainage effect and economy of long directional roof borehole, 2 boreholes were laid out in Xinji No. 2 mine to analyze its gas drainage and investment costs comparing with high position roof borehole and high position roof roadway. The result indicates that the long directional roof borehole save investment by 44.8% and shorten the construction period by 30%, comparing with high position roof roadway for controlling gas in the working face. Investment slightly less and shorten the construction period by 47.5%, comparing with the roof high position borehole. Therefore, the method of the long directional roof borehole to drain coalbed gas in working face is the most cost-effective.
2012-12-01
C2 Command and Control CAIG Cost Analysis Improvement Group CAS Close Air Support CASA Construcciones Aeronáuticas SA CLS Contract...Commercially Available Off-the-Shelf Commercially available off-the shelf (COTS) is defined as any item of supply (including construction material...uses are found for old weapons that were constructed for use in industrial war against soldiers and heavy armament. 6. The sides are mostly non
NASA Astrophysics Data System (ADS)
Hu, Xiaosong; Martinez, Clara Marina; Yang, Yalian
2017-03-01
Holistic energy management of plug-in hybrid electric vehicles (PHEVs) in smart grid environment constitutes an enormous control challenge. This paper responds to this challenge by investigating the interactions among three important control tasks, i.e., charging, on-road power management, and battery degradation mitigation, in PHEVs. Three notable original contributions distinguish our work from existing endeavors. First, a new convex programming (CP)-based cost-optimal control framework is constructed to minimize the daily operational expense of a PHEV, which seamlessly integrates costs of the three tasks. Second, a straightforward but useful sensitivity assessment of the optimization outcome is executed with respect to price changes of battery and energy carriers. The potential impact of vehicle-to-grid (V2G) power flow on the PHEV economy is eventually analyzed through a multitude of comparative studies.
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO₂ emissions of input materials for each structural frame type. In addition, the CO₂ emissions cost was measured using the trading price of CO₂ emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO₂ emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO₂ emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future.
Higashi, Hideki; Truong, Khoa D; Barendregt, Jan J; Nguyen, Phuong K; Vuong, Mai L; Nguyen, Thuy T; Hoang, Phuong T; Wallace, Angela L; Tran, Tien V; Le, Cuong Q; Doran, Christopher M
2011-05-01
Tobacco smoking is one of the leading public health problems in the world. It is also possible to prevent and/or reduce the harm from tobacco use through the use of cost-effective tobacco control measures. However, most of this evidence comes from developed countries and little research has been conducted on this issue in developing countries. The objective of this study was to analyse the cost effectiveness of four population-level tobacco control interventions in Vietnam. Four tobacco control interventions were evaluated: excise tax increase; graphic warning labels on cigarette packs; mass media campaigns; and smoking bans (in public or in work places). A multi-state life table model was constructed in Microsoft® Excel to examine the cost effectiveness of the tobacco control intervention options. A government perspective was adopted, with costing conducted using a bottom-up approach. Health improvement was considered in terms of disability-adjusted life-years (DALYs) averted. All assumptions were subject to sensitivity and uncertainty analysis. All the interventions fell within the definition of being very cost effective according to the threshold level suggested by the WHO (i.e.
Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272
DOT National Transportation Integrated Search
2009-12-22
One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...
NASA Astrophysics Data System (ADS)
Ferkinhoff, Carl
2014-07-01
There have been several exciting developments in the technologies commonly used n in the hardware hacking community. Advances in low cost additive-manufacturing processes (i.e. 3D-printers) and the development of openhardware projects, which have produced inexpensive and easily programmable micro-controllers and micro-computers (i.e. Arduino and Raspberry Pi) have opened a new door for individuals seeking to make their own devices. Here we describe the potential for these technologies to reduce costs in construction and development of submillimeter/millimeter astronomical instrumentation. Specifically we have begun a program to measure the optical properties of the custom plastics used in 3D-printers as well as the printer accuracy and resolution to assess the feasibility of directly printing sub- /millimeter transmissive optics. We will also discuss low cost designs for cryogenic temperature measurement and control utilizing Arduino and Raspberry Pi.
ERIC Educational Resources Information Center
Gopal, Venkatesh; Klosowiak, Julian L.; Jaeger, Robert; Selimkhanov, Timur; Hartmann, Mitra J. Z.
2008-01-01
We describe the construction and operation of three low-cost schlieren imaging systems that can be fabricated using surplus optics and 80/20, an aluminium extrusion based construction system. Each system has a different optical configuration. The low cost and ease of construction makes these systems highly suitable for high-school and…
1990-09-01
following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W
DOT National Transportation Integrated Search
1995-02-01
Pavement related effects of changes in truck size and weight regulations include the following: (1) Increased traffic loadings require thicker pavements which, in turn, increase the construction cost of pavements. (2) For existing pavements, increase...
Cost estimators for construction of forest roads in the central Appalachians
Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler
1992-01-01
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...
Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade)
2013-12-01
MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other PAUC - Program Acquisition Unit Cost PB - President’s...and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be Determined TY - Then Year UCR - Unit Cost Reporting AWACS Blk...Objective and Threshold, and Current Estimate for IOT&E milestone have been corrected from June 2011 to June 2012, to reflect the actual date of
1982-04-22
acquisition would be an obligation made by the Environmental Protection Agency to a State to aid in the construction of a sewage treatment plant ...DE 1 PINELLAS COUNTY-TREASURE IS. CON FT... 3 FIRE IS. INLET TO JONES BEACH CON NY 2 TOTAL ESTIMATED COST CURRENT BASELINE...HELLFIRE MISSILE SYSTEM EQP OH 418 :I:ND WASTE TREATMENT PLANT CON TN 345 HOSPITAL IMPROVEMENTS FT HOOD CON TX 339 MLRS
Luhmann, Scott J; McAughey, Eoin M; Ackerman, Stacey J; Bumpass, David B; McCarthy, Richard E
2018-01-01
Treating early-onset scoliosis (EOS) with traditional growing rods (TGR) is effective but requires periodic surgical lengthening, risking complications. Alternatives include magnetically controlled growing rods (MCGR) that lengthen noninvasively and the growth guidance system (GGS), which obviate the need for active, distractive lengthenings. Previous studies have reported promising clinical effectiveness for GGS; however the direct medical costs of GGS compared to TGR and MCGR have not yet been explored. To estimate the cost of GGS compared with MCGR and TGR for EOS an economic model was developed from the perspective of a US integrated health care delivery system. Using dual-rod constructs, the model estimated the cumulative costs associated with initial implantation, rod lengthenings (TGR, MCGR), revisions due to device failure, surgical-site infections, device exchange, and final spinal fusion over a 6-year episode of care. Model parameters were from peer-reviewed, published literature. Medicare payments were used as a proxy for provider costs. Costs (2016 US$) were discounted 3% annually. Over a 6-year episode of care, GGS was associated with fewer invasive surgeries per patient than TGR (GGS: 3.4; TGR: 14.4) and lower cumulative costs than MCGR and TGR, saving $25,226 vs TGR. Sensitivity analyses showed that results were sensitive to changes in construct costs, rod breakage rates, months between lengthenings, and TGR lengthening setting of care. Within the model, GGS resulted in fewer invasive surgeries and deep surgical site infections than TGR, and lower cumulative costs per patient than both MCGR and TGR, over a 6-year episode of care. The analysis did not account for family disruption, pain, psychological distress, or compromised health-related quality of life associated with invasive TGR lengthenings, nor for potential patient anxiety surrounding the frequent MCGR lengthenings. Further analyses focusing strictly on current generation technologies should be considered for future research.
Luhmann, Scott J; McAughey, Eoin M; Ackerman, Stacey J; Bumpass, David B; McCarthy, Richard E
2018-01-01
Purpose Treating early-onset scoliosis (EOS) with traditional growing rods (TGR) is effective but requires periodic surgical lengthening, risking complications. Alternatives include magnetically controlled growing rods (MCGR) that lengthen noninvasively and the growth guidance system (GGS), which obviate the need for active, distractive lengthenings. Previous studies have reported promising clinical effectiveness for GGS; however the direct medical costs of GGS compared to TGR and MCGR have not yet been explored. Methods To estimate the cost of GGS compared with MCGR and TGR for EOS an economic model was developed from the perspective of a US integrated health care delivery system. Using dual-rod constructs, the model estimated the cumulative costs associated with initial implantation, rod lengthenings (TGR, MCGR), revisions due to device failure, surgical-site infections, device exchange, and final spinal fusion over a 6-year episode of care. Model parameters were from peer-reviewed, published literature. Medicare payments were used as a proxy for provider costs. Costs (2016 US$) were discounted 3% annually. Results Over a 6-year episode of care, GGS was associated with fewer invasive surgeries per patient than TGR (GGS: 3.4; TGR: 14.4) and lower cumulative costs than MCGR and TGR, saving $25,226 vs TGR. Sensitivity analyses showed that results were sensitive to changes in construct costs, rod breakage rates, months between lengthenings, and TGR lengthening setting of care. Conclusion Within the model, GGS resulted in fewer invasive surgeries and deep surgical site infections than TGR, and lower cumulative costs per patient than both MCGR and TGR, over a 6-year episode of care. The analysis did not account for family disruption, pain, psychological distress, or compromised health-related quality of life associated with invasive TGR lengthenings, nor for potential patient anxiety surrounding the frequent MCGR lengthenings. Further analyses focusing strictly on current generation technologies should be considered for future research. PMID:29588607
Age in Relation to Worker Compensation Costs in the Construction Industry
Schwatka, Natalie V.; Butler, Lesley M.; Rosecrance, John C.
2015-01-01
Background A better understanding of how workers’ compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. Methods The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Results Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18–24. Conclusions Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. PMID:22782837
Age in relation to worker compensation costs in the construction industry.
Schwatka, Natalie V; Butler, Lesley M; Rosecrance, John C
2013-03-01
A better understanding of how workers' compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18-24. Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. Copyright © 2012 Wiley Periodicals, Inc.
25 CFR 136.3 - Repayment of construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Repayment of construction costs. 136.3 Section 136.3 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.3 Repayment of construction costs. Under the terms of the contracts, the...
Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].
ERIC Educational Resources Information Center
Geothermal Heat Pump Consortium, Inc., Washington, DC.
A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)
48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO2 emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO2 emissions of input materials for each structural frame type. In addition, the CO2 emissions cost was measured using the trading price of CO2 emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO2 emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO2 emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future. PMID:24227998
A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation
Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869
Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat
2017-07-01
Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.
Cost effective management of space venture risks
NASA Technical Reports Server (NTRS)
Giuntini, Ronald E.; Storm, Richard E.
1986-01-01
The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
Specifications for the First CSP Building System.
ERIC Educational Resources Information Center
Detroit Public Schools, MI.
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…
DOT National Transportation Integrated Search
2010-09-01
In an effort to promote the use of increasing stockpiles of waste tires and a growing demand for adequate : backfill material in highway construction, NMDOT has embarked on a move to use compressed tire-bales : as a means to reduce cost of constructi...
IMPACT OF O3 ON LEAF CONSTRUCTION COST AND CARBON ISOTOPE DISCRIMINATION
Plant response to ozone (O3) is controlled by the interactive balance between avoidance and intolerance processes. ush bean (Phaseolus vulgaris L.) plants were exposed to O3 in open-top field-exposure chambers in early and late season studies at Corvallis, Oregon. lants were grow...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
ERIC Educational Resources Information Center
Rittner-Heir, Robbin M.
2001-01-01
Explains how the Ocoee Middle School (Orlando, Florida) improved the ability of students to hear in their classrooms and gained improvements in their attention levels and their conduct. Specific design concepts that make Ocoee Middle School the SMART school of the future while also controlling design and construction costs are examined. (GR)
Computer Review Can Cut HVAC Energy Use
ERIC Educational Resources Information Center
McClure, Charles J. R.
1974-01-01
A computerized review of construction bidding documents, usually done by a consulting engineer, can reveal how much money it will cost to operate various alternative types of HVAC equipment over a school's lifetime. The review should include a computerized load calculation, energy systems flow diagram, control system analysis, and a computerized…
ERIC Educational Resources Information Center
Matsuo, Tsutomu; And Others
1989-01-01
Presented is a photoelectric colorimeter which can be assembled by the student. Reports that it can do many of the same analyses as the SPEC 20 but at a greatly reduced cost using older technology. Presents several experiments to use with the colorimeter. (MVL)
40 CFR 35.937-3 - Evaluation of qualifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
PHENIX Work Breakdown Structure. Cost and schedule review copy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
Liu, Derong; Wang, Ding; Li, Hongliang
2014-02-01
In this paper, using a neural-network-based online learning optimal control approach, a novel decentralized control strategy is developed to stabilize a class of continuous-time nonlinear interconnected large-scale systems. First, optimal controllers of the isolated subsystems are designed with cost functions reflecting the bounds of interconnections. Then, it is proven that the decentralized control strategy of the overall system can be established by adding appropriate feedback gains to the optimal control policies of the isolated subsystems. Next, an online policy iteration algorithm is presented to solve the Hamilton-Jacobi-Bellman equations related to the optimal control problem. Through constructing a set of critic neural networks, the cost functions can be obtained approximately, followed by the control policies. Furthermore, the dynamics of the estimation errors of the critic networks are verified to be uniformly and ultimately bounded. Finally, a simulation example is provided to illustrate the effectiveness of the present decentralized control scheme.
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
NASA Astrophysics Data System (ADS)
Boyd, Alexander B.; Crutchfield, James P.
2016-05-01
We introduce a deterministic chaotic system—the Szilard map—that encapsulates the measurement, control, and erasure protocol by which Maxwellian demons extract work from a heat reservoir. Implementing the demon's control function in a dynamical embodiment, our construction symmetrizes the demon and the thermodynamic system, allowing one to explore their functionality and recover the fundamental trade-off between the thermodynamic costs of dissipation due to measurement and those due to erasure. The map's degree of chaos—captured by the Kolmogorov-Sinai entropy—is the rate of energy extraction from the heat bath. Moreover, an engine's statistical complexity quantifies the minimum necessary system memory for it to function. In this way, dynamical instability in the control protocol plays an essential and constructive role in intelligent thermodynamic systems.
Method of Optimizing the Construction of Machining, Assembly and Control Devices
NASA Astrophysics Data System (ADS)
Iordache, D. M.; Costea, A.; Niţu, E. L.; Rizea, A. D.; Babă, A.
2017-10-01
Industry dynamics, driven by economic and social requirements, must generate more interest in technological optimization, capable of ensuring a steady development of advanced technical means to equip machining processes. For these reasons, the development of tools, devices, work equipment and control, as well as the modernization of machine tools, is the certain solution to modernize production systems that require considerable time and effort. This type of approach is also related to our theoretical, experimental and industrial applications of recent years, presented in this paper, which have as main objectives the elaboration and use of mathematical models, new calculation methods, optimization algorithms, new processing and control methods, as well as some structures for the construction and configuration of technological equipment with a high level of performance and substantially reduced costs..
Spacecraft control center automation using the generic inferential executor (GENIE)
NASA Technical Reports Server (NTRS)
Hartley, Jonathan; Luczak, Ed; Stump, Doug
1996-01-01
The increasing requirement to dramatically reduce the cost of mission operations led to increased emphasis on automation technology. The expert system technology used at the Goddard Space Flight Center (MD) is currently being applied to the automation of spacecraft control center activities. The generic inferential executor (GENIE) is a tool which allows pass automation applications to be constructed. The pass script templates constructed encode the tasks necessary to mimic flight operations team interactions with the spacecraft during a pass. These templates can be configured with data specific to a particular pass. Animated graphical displays illustrate the progress during the pass. The first GENIE application automates passes of the solar, anomalous and magnetospheric particle explorer (SAMPEX) spacecraft.
Inventory Control System for a Healthcare Apparel Service Centre with Stockout Risk: A Case Analysis
Hui, Chi-Leung
2017-01-01
Based on the real-world inventory control problem of a capacitated healthcare apparel service centre in Hong Kong which provides tailor-made apparel-making services for the elderly and disabled people, this paper studies a partial backordered continuous review inventory control problem in which the product demand follows a Poisson process with a constant lead time. The system is controlled by an (Q,r) inventory policy which incorporate the stockout risk, storage capacity, and partial backlog. The healthcare apparel service centre, under the capacity constraint, aims to minimize the inventory cost and achieving a low stockout risk. To address this challenge, an optimization problem is constructed. A real case-based data analysis is conducted, and the result shows that the expected total cost on an order cycle is reduced substantially at around 20% with our proposed optimal inventory control policy. An extensive sensitivity analysis is conducted to generate additional insights. PMID:29527283
Pan, An; Hui, Chi-Leung
2017-01-01
Based on the real-world inventory control problem of a capacitated healthcare apparel service centre in Hong Kong which provides tailor-made apparel-making services for the elderly and disabled people, this paper studies a partial backordered continuous review inventory control problem in which the product demand follows a Poisson process with a constant lead time. The system is controlled by an ( Q , r ) inventory policy which incorporate the stockout risk, storage capacity, and partial backlog. The healthcare apparel service centre, under the capacity constraint, aims to minimize the inventory cost and achieving a low stockout risk. To address this challenge, an optimization problem is constructed. A real case-based data analysis is conducted, and the result shows that the expected total cost on an order cycle is reduced substantially at around 20% with our proposed optimal inventory control policy. An extensive sensitivity analysis is conducted to generate additional insights.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
NASA Astrophysics Data System (ADS)
Stadler, Philipp; Farnleitner, Andreas H.; Zessner, Matthias
2016-04-01
This presentation describes in-depth how a low cost micro-computer was used for substantial improvement of established measuring systems due to the construction and implementation of a purposeful complementary device for on-site sample pretreatment. A fully automated on-site device was developed and field-tested, that enables water sampling with simultaneous filtration as well as effective cleaning procedure of the devicés components. The described auto-sampler is controlled by a low-cost one-board computer and designed for sample pre-treatment, with minimal sample alteration, to meet requirements of on-site measurement devices that cannot handle coarse suspended solids within the measurement procedure or -cycle. The automated sample pretreatment was tested for over one year for rapid and on-site enzymatic activity (beta-D-glucuronidase, GLUC) determination in sediment laden stream water. The formerly used proprietary sampling set-up was assumed to lead to a significant damping of the measurement signal due to its susceptibility to clogging, debris- and bio film accumulation. Results show that the installation of the developed apparatus considerably enhanced error-free running time of connected measurement devices and increased the measurement accuracy to an up-to-now unmatched quality.
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.
Evaluation of ways and procedures to reduce construction cost and increase competition.
DOT National Transportation Integrated Search
2009-01-01
Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...
House Construction: How To Reduce Costs
Jerry O. Newman; Norman C. Teter; Constance D. O' Brien
1969-01-01
You're building a house and want to keep down the cost. How can you do it? First, plan carefully "on paper" before you start construction. By doing so, you can avoid costly mistakesinthebuildingandinthe purchase of materials. Careful planning and proper design will reduce not only the initial cost but also the cost of furnishings, utilities, and...
[A cost-benefit analysis of occupational disease reporting in China].
Tang, X Z; Zeng, Q; Liu, D S
2017-03-20
Objective: To perform a cost-benefit analysis of the occupational disease reporting system in China, and to provide a basis for effective resource allocation. Methods: The data on the cost of occupational diseases were collected from China Health Statistics Yearbook 2013, the estimated benefit data were collected from published articles in China and foreign countries, and the probability data were collected from the occupational diseasereports published by health and family planning administrative departments. Adecision-making tree was used for the cost-benefit analysis. Results: The estimated cost of occupational disease reporting was about 102.47 million yuan/year, consisting of a cost of reporting in national medical institutions of 1.25 million yuan/year, a management cost of 30.35 million yuan/year, a management cost in local public health institutions of 69.80 million yuan/year, a management cost in national public health institutions of 370 thousand yuan/year, and a cost of construction and maintenance of reporting system of 700 thousand yuan/year. The results of the decision tree analysis showed that when an occupational disease monitoring system was established, the incremental input for occupational disease monitoring and prevention/control was 2.1 billion yuan/year, the output was 6.5 billion yuan/year, and the benefit of occupational disease reporting system was 4.4 billion yuan/year. Conclusion: The benefit of occupational disease reporting system depends on the cost-benefit of occupational disease prevention and control measures, and proper prevention and control measures are extremely important for improving the benefit of occupational disease reporting system.
A Study of Construction Contract Delay; Causes and Impacts.
1987-08-01
industry-wide, lack of use of state of the art management systems for schedule and cost control , and a general lack of owner attention to contract...all barriers contractually required for a contractor to proceed, or by an outside force which neither party can control . Serial delay is a "linkage" or...maJeure’ causes, or acts of God, and those caused by outside forces. Unforeseen conditions are beyond the control of the related parties, and are not
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
24 CFR 578.47 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true New construction. 578.47 Section 578... construction. (a) Use. Grant funds may be used to: (1) Pay up to 100 percent of the cost of new construction... the floor area by 100 percent or more, and the cost of land associated with that construction, for use...
50 CFR 253.11 - Guarantee policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...
Elementary Introduction to the Green Management of the Construction in Whole Process
NASA Astrophysics Data System (ADS)
Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi
Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.
Construction bidding cost of KSC's space shuttle facilities
NASA Technical Reports Server (NTRS)
Brown, Joseph Andrew
1977-01-01
The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
Allocation of control rights in the PPP Project: a cooperative game model
NASA Astrophysics Data System (ADS)
Zhang, Yunhua; Feng, Jingchun; Yang, Shengtao
2017-06-01
Reasonable allocation of control rights is the key to the success of Public-Private Partnership (PPP) projects. PPP are services or ventures which are financed and operated through cooperation between governmental and private sector actors and which involve reasonable control rights sharing between these two partners. After professional firm with capital and technology as a shareholder participating in PPP project firms, the PPP project is diversified in participants and input resources. Meanwhile the allocation of control rights of PPP project tends to be complicated. According to the diversification of participants and input resources of PPP projects, the key participants are divided into professional firms and pure investors. Based on the cost of repurchase of different input resources in markets, the cooperative game relationship between these two parties is analyzed, on the basis of which the allocation model of the cooperative game for control rights is constructed to ensure optimum allocation ration of control rights and verify the share of control rights in proportion to the cost of repurchase.
Code of Federal Regulations, 2012 CFR
2012-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
Code of Federal Regulations, 2014 CFR
2014-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
Code of Federal Regulations, 2013 CFR
2013-07-01
... achieving such emission reduction and any non-air quality health and environmental impacts and energy..., and analysis of cost and non-air quality health environmental impacts or energy requirements for the...-day period for submittal of public comment; and (iii) A notice by prominent advertisement in the area...
A System for Cooling inside a Glove Box
ERIC Educational Resources Information Center
Sanz, Martial
2010-01-01
An easy, efficient, reliable, and low-cost method of constructing a cooling system using a simple circulating pump is described. The system is employed in conjunction with an inert atmosphere glove box to achieve the synthesis of air- and moisture-sensitive compounds inside the glove box at controlled, low temperatures without contaminating the…
48 CFR 236.271 - Cost-plus-fixed-fee contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...
23 CFR 635.205 - Finding of cost effectiveness.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Finding of cost effectiveness. 635.205 Section 635.205... CONSTRUCTION AND MAINTENANCE Force Account Construction § 635.205 Finding of cost effectiveness. (a) It may be found cost effective for a State transportation department or county to undertake a federally financed...
Bioreactor performance: a more scientific approach for practice.
Lübbert, A; Bay Jørgensen, S
2001-02-13
In practice, the performance of a biochemical conversion process, i.e. the bioreactor performance, is essentially determined by the benefit/cost ratio. The benefit is generally defined in terms of the amount of the desired product produced and its market price. Cost reduction is the major objective in biochemical engineering. There are two essential engineering approaches to minimizing the cost of creating a particular product in an existing plant. One is to find a control path or operational procedure that optimally uses the dynamics of the process and copes with the many constraints restricting production. The other is to remove or lower the constraints by constructive improvements of the equipment and/or the microorganisms. This paper focuses on the first approach, dealing with optimization of the operational procedure and the measures by which one can ensure that the process adheres to the predetermined path. In practice, feedforward control is the predominant control mode applied. However, as it is frequently inadequate for optimal performance, feedback control may also be employed. Relevant aspects of such performance optimization are discussed.
Multi-disciplinary optimization of aeroservoelastic systems
NASA Technical Reports Server (NTRS)
Karpel, Mordechay
1990-01-01
Efficient analytical and computational tools for simultaneous optimal design of the structural and control components of aeroservoelastic systems are presented. The optimization objective is to achieve aircraft performance requirements and sufficient flutter and control stability margins with a minimal weight penalty and without violating the design constraints. Analytical sensitivity derivatives facilitate an efficient optimization process which allows a relatively large number of design variables. Standard finite element and unsteady aerodynamic routines are used to construct a modal data base. Minimum State aerodynamic approximations and dynamic residualization methods are used to construct a high accuracy, low order aeroservoelastic model. Sensitivity derivatives of flutter dynamic pressure, control stability margins and control effectiveness with respect to structural and control design variables are presented. The performance requirements are utilized by equality constraints which affect the sensitivity derivatives. A gradient-based optimization algorithm is used to minimize an overall cost function. A realistic numerical example of a composite wing with four controls is used to demonstrate the modeling technique, the optimization process, and their accuracy and efficiency.
Multidisciplinary optimization of aeroservoelastic systems using reduced-size models
NASA Technical Reports Server (NTRS)
Karpel, Mordechay
1992-01-01
Efficient analytical and computational tools for simultaneous optimal design of the structural and control components of aeroservoelastic systems are presented. The optimization objective is to achieve aircraft performance requirements and sufficient flutter and control stability margins with a minimal weight penalty and without violating the design constraints. Analytical sensitivity derivatives facilitate an efficient optimization process which allows a relatively large number of design variables. Standard finite element and unsteady aerodynamic routines are used to construct a modal data base. Minimum State aerodynamic approximations and dynamic residualization methods are used to construct a high accuracy, low order aeroservoelastic model. Sensitivity derivatives of flutter dynamic pressure, control stability margins and control effectiveness with respect to structural and control design variables are presented. The performance requirements are utilized by equality constraints which affect the sensitivity derivatives. A gradient-based optimization algorithm is used to minimize an overall cost function. A realistic numerical example of a composite wing with four controls is used to demonstrate the modeling technique, the optimization process, and their accuracy and efficiency.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Fuzzy Adaptive Decentralized Optimal Control for Strict Feedback Nonlinear Large-Scale Systems.
Sun, Kangkang; Sui, Shuai; Tong, Shaocheng
2018-04-01
This paper considers the optimal decentralized fuzzy adaptive control design problem for a class of interconnected large-scale nonlinear systems in strict feedback form and with unknown nonlinear functions. The fuzzy logic systems are introduced to learn the unknown dynamics and cost functions, respectively, and a state estimator is developed. By applying the state estimator and the backstepping recursive design algorithm, a decentralized feedforward controller is established. By using the backstepping decentralized feedforward control scheme, the considered interconnected large-scale nonlinear system in strict feedback form is changed into an equivalent affine large-scale nonlinear system. Subsequently, an optimal decentralized fuzzy adaptive control scheme is constructed. The whole optimal decentralized fuzzy adaptive controller is composed of a decentralized feedforward control and an optimal decentralized control. It is proved that the developed optimal decentralized controller can ensure that all the variables of the control system are uniformly ultimately bounded, and the cost functions are the smallest. Two simulation examples are provided to illustrate the validity of the developed optimal decentralized fuzzy adaptive control scheme.
van der Molen, Henk F; Frings-Dresen, Monique H W
2014-05-31
Safety measures should be applied to reduce work-related fatal and non-fatal fall injuries. However, according to the labor inspectorate, more than 80% of Dutch construction sites violate safety regulations for working from heights. To increase compliance with safety regulations, employers and workers have to select, implement and monitor safety measures. To facilitate this behavioral change, stimulating knowledge awareness and personalized feedback are frequently advocated behavior change techniques. For this study, two behavior change strategies have been developed in addition to the announcement of safety inspections by the labor inspectorate. These strategies consist of 1) face-to-face contacts with safety consultants and 2) direct mail with access to internet facilities. The objective of this study is to evaluate the effectiveness of these two strategies on the safety violations for working from heights, the process and the cost measures. This study is a block randomized intervention trial in 27 cities to establish the effects of the face-to-face guidance strategy (N = 9), a direct mailing strategy (N = 9) and a control condition of no guidance (N = 9) on safety violations to record by labor inspectors after three months. A process evaluation for both strategies will be performed to determine program implementation (reach, dose delivered and dose received), satisfaction, knowledge and perceived safety behavior. A cost analysis will be performed to establish the financial costs for both strategies. The present study is in accordance with the CONSORT statement. This study increases insight into performing practice-based randomized controlled trials. The outcome will help to evaluate the effect of two guidance strategies on safety violations. If these strategies are effective, implementation of these strategies through the national institute of safety and health or labor inspectorate can take place to guide construction companies in complying with safety regulations. NTR 4298 on 29-nov-2013.
Precision vector control of a superconducting RF cavity driven by an injection locked magnetron
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chase, Brian; Pasquinelli, Ralph; Cullerton, Ed
The technique presented in this paper enables the regulation of both radio frequency amplitude and phase in narrow band devices such as a Superconducting RF (SRF) cavity driven by constant power output devices i.e. magnetrons [1]. The ability to use low cost high efficiency magnetrons for accelerator RF power systems, with tight vector regulation, presents a substantial cost savings in both construction and operating costs - compared to current RF power system technology. An operating CW system at 2.45 GHz has been experimentally developed. Vector control of an injection locked magnetron has been extensively tested and characterized with a SRFmore » cavity as the load. Amplitude dynamic range of 30 dB, amplitude stability of 0.3% r.m.s, and phase stability of 0.26 degrees r.m.s. has been demonstrated.« less
Use of health economics in the development of a national radon control strategy in Ireland.
Pollard, D; Fenton, D
2014-07-01
A health economics evaluation of different radon intervention strategies was undertaken including the incorporation of prevention into new buildings, the incorporation of potential remedial measures into new buildings and remediation of existing buildings. The analysis shows that (1) the incorporation of prevention into new houses at the time of construction is generally more cost effective than remediation of existing houses and (2) that the cost effectiveness of programmes aimed at encouraging householders to test and remediate their houses may be poor if they are not undertaken within the context of coherent radon reduction strategy. The results of this evaluation were used to identify the most cost-effective radon interventions in an Irish context in support of the development of a National Radon Control Strategy. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Precision vector control of a superconducting RF cavity driven by an injection locked magnetron
Chase, Brian; Pasquinelli, Ralph; Cullerton, Ed; ...
2015-03-01
The technique presented in this paper enables the regulation of both radio frequency amplitude and phase in narrow band devices such as a Superconducting RF (SRF) cavity driven by constant power output devices i.e. magnetrons [1]. The ability to use low cost high efficiency magnetrons for accelerator RF power systems, with tight vector regulation, presents a substantial cost savings in both construction and operating costs - compared to current RF power system technology. An operating CW system at 2.45 GHz has been experimentally developed. Vector control of an injection locked magnetron has been extensively tested and characterized with a SRFmore » cavity as the load. Amplitude dynamic range of 30 dB, amplitude stability of 0.3% r.m.s, and phase stability of 0.26 degrees r.m.s. has been demonstrated.« less
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents comparative data on college and university residence hall construction projects, including construction costs, size, numbers of students, and cost per square foot. Also provides comparative housing cost data over the past decade and identifies types of amenities being added to dormitories. (GR)
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
48 CFR 9904.417-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be added to the construction-in-progress account in recognition of the cost of money related to... should be added to the construction-in-progress account in recognition of the cost of money while under... the costs were incurred at a fairly uniform rate throughout the period. Because of the pattern of cost...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Specially Adapted Housing; Cost-of-Construction Index AGENCY: Department of Veterans Affairs. ACTION: Notice... SAH assistance annually based on a residential home cost-of-construction index. The Secretary uses the Turner Building Cost Index for this purpose. During the most recent calendar year for which the Turner...
Literature review of methods to determine road user costs in construction zones
DOT National Transportation Integrated Search
1997-01-01
As freeway construction increases with the need to expand, repair and maintain the existing infrastructure, the desire to quantify the inconvenience or delay costs to the user of the freeway undergoing construction has increased and become neccessary...
A worksite prevention program for construction workers: design of a randomized controlled trial.
Oude Hengel, Karen M; Joling, Catelijne I; Proper, Karin I; Blatter, Birgitte M; Bongers, Paulien M
2010-06-14
A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1) two individual training sessions of a physical therapist to lower the physical workload, (2) a Rest-Break tool to improve the balance between work and recovery, and (3) two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. NTR1278.
A worksite prevention program for construction workers: design of a randomized controlled trial
2010-01-01
Background A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. Methods The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1) two individual training sessions of a physical therapist to lower the physical workload, (2) a Rest-Break tool to improve the balance between work and recovery, and (3) two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. Discussion The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. Trial Registration NTR1278 PMID:20546568
Cost-utility analysis of a preventive home visit program for older adults in Germany.
Brettschneider, Christian; Luck, Tobias; Fleischer, Steffen; Roling, Gudrun; Beutner, Katrin; Luppa, Melanie; Behrens, Johann; Riedel-Heller, Steffi G; König, Hans-Helmut
2015-04-03
Most older adults want to live independently in a familiar environment instead of moving to a nursing home. Preventive home visits based on multidimensional geriatric assessment can be one strategy to support this preference and might additionally reduce health care costs, due to the avoidance of costly nursing home admissions. The purpose of this study was to analyse the cost-effectiveness of preventive home visits from a societal perspective in Germany. This study is part of a multi-centre, non-blinded, randomised controlled trial aiming at the reduction of nursing home admissions. Participants were older than 80 years and living at home. Up to three home visits were conducted to identify self-care deficits and risk factors, to present recommendations and to implement solutions. The control group received usual care. A cost-utility analysis using quality-adjusted life years (QALY) based on the EQ-5D was performed. Resource utilization was assessed by means of the interview version of a patient questionnaire. A cost-effectiveness acceptability curve controlled for prognostic variables was constructed and a sensitivity analysis to control for the influence of the mode of QALY calculation was performed. 278 individuals (intervention group: 133; control group: 145) were included in the analysis. During 18 months follow-up mean adjusted total cost (mean: +4,401 EUR; bootstrapped standard error: 3,019.61 EUR) and number of QALY (mean: 0.0061 QALY; bootstrapped standard error: 0.0388 QALY) were higher in the intervention group, but differences were not significant. For preventive home visits the probability of an incremental cost-effectiveness ratio <50,000 EUR per QALY was only 15%. The results were robust with respect to the mode of QALY calculation. The evaluated preventive home visits programme is unlikely to be cost-effective. Clinical Trials.gov Identifier: NCT00644826.
NASA Technical Reports Server (NTRS)
Willis, P. B.; Baum, B.; White, R. A.
1978-01-01
The results of an investigation of solar module encapsulation systems applicable to the Low-Cost Solar Array Project 1986 cost and performance goals are presented. Six basic construction elements were identified and their specific uses in module construction defined. A uniform coating basis was established for each element. The survey results were also useful in revealing price ranges for classes of materials and estimating the cost allocation for each element within the encapsulating cost goal. The six construction elements were considered to be substrates, superstrates, pottants, adhesives, outer covers and back covers.
Workers' compensation costs among construction workers: a robust regression analysis.
Friedman, Lee S; Forst, Linda S
2009-11-01
Workers' compensation data are an important source for evaluating costs associated with construction injuries. We describe the characteristics of injured construction workers filing claims in Illinois between 2000 and 2005 and the factors associated with compensation costs using a robust regression model. In the final multivariable model, the cumulative percent temporary and permanent disability-measures of severity of injury-explained 38.7% of the variance of cost. Attorney costs explained only 0.3% of the variance of the dependent variable. The model used in this study clearly indicated that percent disability was the most important determinant of cost, although the method and uniformity of percent impairment allocation could be better elucidated. There is a need to integrate analytical methods that are suitable for skewed data when analyzing claim costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatt, Arpit; Zhang, Yimin; Davis, Ryan
The implementation of the US Renewable Fuel Standard is expected to increase the construction and operation of new biofuel facilities. Allowing this industry to grow without adversely affecting air quality is an important sustainability goal sought by multiple stakeholders. However, little is known about how the emission controls potentially required to comply with air quality regulations might impact biorefinery cost and deployment strategies such as siting and sizing. In this study, we use a baseline design for a lignocellulosic hydrocarbon biofuel production process to assess how the integration of emission controls impacts the minimum fuel selling price (MFSP) of themore » biofuel produced. We evaluate the change in MFSP for two cases as compared to the baseline design by incorporating (i) emission controls that ensure compliance with applicable federal air regulations and (ii) advanced control options that could be used to achieve potential best available control technology (BACT) emission limits. Our results indicate that compliance with federal air regulations can be achieved with minimal impact on biofuel cost (~$0.02 per gasoline gallon equivalent (GGE) higher than the baseline price of $5.10 GGE -1). However, if air emissions must be further reduced to meet potential BACT emission limits, the cost could increase nontrivially. For example, the MFSP could increase to $5.50 GGE -1 by adopting advanced emission controls to meet potential boiler BACT limits. Finally, given tradeoffs among emission control costs, permitting requirements, and economies of scale, these results could help inform decisions about biorefinery siting and sizing and mitigate risks associated with air permitting.« less
NASA Astrophysics Data System (ADS)
McMahon, Allison; Sauncy, Toni
2008-10-01
Light manipulation is a very powerful tool in physics, biology, and chemistry. There are several physical principles underlying the apparatus known as the ``optical tweezers,'' the term given to using focused light to manipulate and control small objects. By carefully controlling the orientation and position of a focused laser beam, dielectric particles can be effectively trapped and manipulated. We have designed a cost efficient and effective undergraduate optical tweezers apparatus by using standard ``off the shelf'' components and starting with a standard undergraduate laboratory microscope. Images are recorded using a small CCD camera interfaced to a computer and controlled by LabVIEW^TM software. By using wave plates to produce circular polarized light, rotational motion can be induced in small particles of birefringent materials such as calcite and mica.
A Semantics-Based Approach to Construction Cost Estimating
ERIC Educational Resources Information Center
Niknam, Mehrdad
2015-01-01
A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…
NASA Technical Reports Server (NTRS)
Burk, S. M., Jr.; Wilson, C. F., Jr.
1975-01-01
A relatively inexpensive radio-controlled model stall/spin test technique was developed. Operational experiences using the technique are presented. A discussion of model construction techniques, spin-recovery parachute system, data recording system, and movie camera tracking system is included. Also discussed are a method of measuring moments of inertia, scaling of engine thrust, cost and time required to conduct a program, and examples of the results obtained from the flight tests.
Coherent optical monolithic phased-array antenna steering system
Hietala, Vincent M.; Kravitz, Stanley H.; Vawter, Gregory A.
1994-01-01
An optical-based RF beam steering system for phased-array antennas comprising a photonic integrated circuit (PIC). The system is based on optical heterodyning employed to produce microwave phase shifting by a monolithic PIC constructed entirely of passive components. Microwave power and control signal distribution to the antenna is accomplished by optical fiber, permitting physical separation of the PIC and its control functions from the antenna. The system reduces size, weight, complexity, and cost of phased-array antenna systems.
1985-09-01
BSTRACT This study uses a systems analysis approach to determine the communications technical control needs of the Fleet Marine Force as the transition...subsequent analysis and decision. In the acquisi- tion of military systems, it is typical to find these assumptions used to construct various measures of...relatively free from the typical underlying estimates used in cost and operational effective- ness analysis (COEA) type studies which are designed to compare
Connection between optimal control theory and adiabatic-passage techniques in quantum systems
NASA Astrophysics Data System (ADS)
Assémat, E.; Sugny, D.
2012-08-01
This work explores the relationship between optimal control theory and adiabatic passage techniques in quantum systems. The study is based on a geometric analysis of the Hamiltonian dynamics constructed from Pontryagin's maximum principle. In a three-level quantum system, we show that the stimulated Raman adiabatic passage technique can be associated to a peculiar Hamiltonian singularity. One deduces that the adiabatic pulse is solution of the optimal control problem only for a specific cost functional. This analysis is extended to the case of a four-level quantum system.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Newman Unit 1 advanced solar repowering advanced conceptual design. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-04-01
The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less
A Cost-Effective Optical Device for the Characterization of Liquid Crystals
ERIC Educational Resources Information Center
Millier, Brian; Aleman Milán, Gianna
2014-01-01
The design and construction of an apparatus to measure the optical birefringence of a liquid crystal is described. The instrument also includes temperature control and monitoring circuitry to allow for the measurement of the nematic-to-isotropic phase transition temperature. An important feature of this design is that the students are able to…
Perchlorate Removal, Destruction, and Field Monitoring Demonstration
2006-10-02
ion exchange unit. A pulsation dampener minimized pressure and flow fluctuations in the ion exchange system and a flow totalizer monitored total...instrumentation and controls, piping , electrical services, site work, service facilities, engineering, construction expenses, and other indirect costs were... Piping 113,750 157,500 Electrical services 48,750 67,500 Site work 65,000 90,000
ERIC Educational Resources Information Center
Zhang, Qing; Brode, Ly; Cao, Tingting; Thompson, J. E.
2017-01-01
We describe the construction and initial demonstration of a new instructional tool called ROXI (Research Opportunity through eXperimental Instruction). The system interfaces a series of electronic sensors to control software via the Arduino platform. The sensors have been designed to enable low-cost data collection in laboratory courses. Data are…
Design and installation of a next generation pilot scale fermentation system.
Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P
2003-01-01
Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sale which includes specified road construction with total estimated construction costs of $50,000 or more, the advertisement shall also include: (1) The total estimated construction cost of the permanent roads. (2) A statement extending to small business concerns qualified for preferential bidding on timber...
Cost-Effective Live Cell Density Determination of Liquid Cultured Microorganisms.
Kutschera, Alexander; Lamb, Jacob J
2018-02-01
Live monitoring of microorganisms growth in liquid medium is a desired parameter for many research fields. A wildly used approach for determining microbial liquid growth quantification is based on light scattering as the result of the physical interaction of light with microbial cells. These measurements are generally achieved using costly table-top instruments; however, a live, reliable, and straight forward instrument constructed using parts that are inexpensive may provide opportunities for many researchers. Here, such an instrument has been constructed and tested. It consists of modular test tube holding chambers, each with a low power monochromatic light-emitting diode, and a monolithic photodiode. A microcontroller connects to all modular chambers to control the diodes, and send the live data to either an LCD screen, or a computer. This work demonstrate that this modular instrument can determine precise cell concentrations for the bacteria Escherichia coli and Pseudomonas syringae pv. tomato DC3000, as well as Saccharomyces cerevisiae yeast.
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2012-03-02
challenging ship redesign as well as a new power and cooling architecture coupled with the challenges to construct such a dense ship, will make...costs. Our prior work has shown that construction of lead ships is challenging , the risk of cost growth is high, and having sufficient construction...not include a thorough trade-off analysis that would compare the relative costs and benefits of different solutions under consideration or provide
NASA Technical Reports Server (NTRS)
1977-01-01
Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
The association between hospital outcomes and diagnostic imaging: early findings.
Lee, David W; Foster, David A
2009-11-01
Resource use variation across the United States prompts the important question of whether "more is better" when it comes to health care services. The aim of this study was to examine correlations between the use of 4 common imaging modalities (CT, MR, ultrasound, and radiography) and in-hospital mortality and costs. Using clinical and utilization data for 1.1 million inpatient admissions at 102 US hospitals during 2007, two hospital-specific, risk-adjusted imaging utilization measures for each modality were constructed that controlled for patients' demographic and clinical characteristics and for hospital characteristics were constructed for each modality. First, logistic regression was used to estimate the odds that each type of imaging service would be provided during an admission. Second, the mean number of services per admission was estimated using output from a two-part ordinary least squares model. Hospital-specific, risk-adjusted inpatient mortality and total hospital costs were also computed, and correlations between the imaging utilization measures and the mortality and cost outcome measures were then assessed using Pearson's correlation coefficients (P < .05). The correlation analyses were weighted by hospital admission volume. Hospitals in which patients were more likely to receive imaging services during admissions had lower mortality, even after controlling for potential confounders. Correlation coefficients were -0.2 for all modalities (P = .02-.05). Weaker correlations existed between mean services per admission and mortality, while costs trended insignificantly higher with greater utilization. This study lays the foundation for further exploration of the relationship between resource use and the clinical and economic outcomes associated with imaging utilization.
Coal supply and cost under technological and environmental uncertainty
NASA Astrophysics Data System (ADS)
Chan, Melissa
This thesis estimates available coal resources, recoverability, mining costs, environmental impacts, and environmental control costs for the United States under technological and environmental uncertainty. It argues for a comprehensive, well-planned research program that will resolve resource uncertainty, and innovate new technologies to improve recovery and environmental performance. A stochastic process and cost (constant 2005) model for longwall, continuous, and surface mines based on current technology and mining practice data was constructed. It estimates production and cost ranges within 5-11 percent of 2006 prices and production rates. The model was applied to the National Coal Resource Assessment. Assuming the cheapest mining method is chosen to extract coal, 250-320 billion tons are recoverable. Two-thirds to all coal resource can be mined at a cost less than 4/mmBTU. If U.S. coal demand substantially increases, as projected by alternate Energy Information Administration (EIA), resources might not last more than 100 years. By scheduling cost to meet EIA projected demand, estimated cost uncertainty increases over time. It costs less than 15/ton to mine in the first 10 years of a 100 year time period, 10-30/ton in the following 50 years, and 15-$90/ton thereafter. Environmental impacts assessed are subsidence from underground mines, surface mine pit area, erosion, acid mine drainage, air pollutant and methane emissions. The analysis reveals that environmental impacts are significant and increasing as coal demand increases. Control technologies recommended to reduce these impacts are backfilling underground mines, surface pit reclamation, substitution of robotic underground mining systems for surface pit mining, soil replacement for erosion, placing barriers between exposed coal and the elements to avoid acid formation, and coalbed methane development to avoid methane emissions during mining. The costs to apply these technologies to meet more stringent environmental regulation scenarios are estimated. The results show that the cost of meeting these regulatory scenarios could increase mining costs two to six times the business as usual cost, which could significantly affect the cost of coal-powered electricity generation. This thesis provides a first estimate of resource availability, mining cost, and environmental impact assessment and cost analysis. Available resource is not completely reported, so the available estimate is lower than actual resource. Mining costs are optimized, so provide a low estimate of potential costs. Environmental impact estimates are on the high end of potential impact that may be incurred because it is assumed that impact is unavoidable. Control costs vary. Estimated cost to control subsidence and surface mine pit impacts are suitable estimates of the cost to reduce land impacts. Erosion control and robotic mining system costs are lower, and methane and acid mine drainage control costs are higher, than they may be in the case that these impacts must be reduced.
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
Solar project cost report for Ingham County, Medical Care Facility, Okemos, Michigan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The solar energy system supplies service hot water for a 204 bed medical and geriatric care facility with laundry and kitchen. The system was designed at the time the building was designed. The 9,374 ft/sup 2/ of collectors were manufactured by Revere Copper and Brass, Inc., and are mounted at grade level behind the building. Solar heated water for use in heating service water is stored in a 5000 gallon hot water storage tank. The heaviest use of hot water occurs during the day so the requirement for thermal storage is modest. The construction costs of this solar project aremore » presented. Category costs are listed by materials, direct labor, ad subcontract costs. The subcontract costs include both materials, labor, overhead and profit for electrical, control and other minor subcontractors. The installed cost of the system was $312,825 not including prime contractor overhead and profit and general and administrative costs. (MHR)« less
NASA Astrophysics Data System (ADS)
Yamasaki, Hayata; Soeda, Akihito; Murao, Mio
2017-09-01
We introduce and analyze graph-associated entanglement cost, a generalization of the entanglement cost of quantum states to multipartite settings. We identify a necessary and sufficient condition for any multipartite entangled state to be constructible when quantum communication between the multiple parties is restricted to a quantum network represented by a tree. The condition for exact state construction is expressed in terms of the Schmidt ranks of the state defined with respect to edges of the tree. We also study approximate state construction and provide a second-order asymptotic analysis.
Digital waterway construction based on inland electronic navigation chart
NASA Astrophysics Data System (ADS)
Wang, Xue; Pan, Junfeng; Zhu, Weiwei
2015-12-01
With advantages of large capacity, long distance, low energy consumption, low cost, less land occupation and light pollution, inland waterway transportation becomes one of the most important constituents of the comprehensive transportation system and comprehensive water resources utilization in China. As one of "three elements" of navigation, waterway is the important basis for the development of water transportation and plays a key supporting role in shipping economic. The paper discuss how to realize the informatization and digitization of waterway management based on constructing an integrated system of standard inland electronic navigation chart production, waterway maintenance, navigation mark remote sensing and control, ship dynamic management, and water level remote sensing and report, which can also be the foundation of the intelligent waterway construction. Digital waterway construction is an information project and also has a practical meaning for waterway. It can not only meet the growing high assurance and security requirements for waterway, but also play a significant advantage in improving transport efficiency, reducing costs, promoting energy conservation and so on. This study lays a solid foundation on realizing intelligent waterway and building a smooth, efficient, safe, green modern inland waterway system, and must be considered as an unavoidable problem for the coordinated development between "low carbon" transportation and social economic.
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
Polymorphic design of DNA origami structures through mechanical control of modular components.
Lee, Chanseok; Lee, Jae Young; Kim, Do-Nyun
2017-12-12
Scaffolded DNA origami enables the bottom-up fabrication of diverse DNA nanostructures by designing hundreds of staple strands, comprised of complementary sequences to the specific binding locations of a scaffold strand. Despite its exceptionally high design flexibility, poor reusability of staples has been one of the major hurdles to fabricate assorted DNA constructs in an effective way. Here we provide a rational module-based design approach to create distinct bent shapes with controllable geometries and flexibilities from a single, reference set of staples. By revising the staple connectivity within the desired module, we can control the location, stiffness, and included angle of hinges precisely, enabling the construction of dozens of single- or multiple-hinge structures with the replacement of staple strands up to 12.8% only. Our design approach, combined with computational shape prediction and analysis, can provide a versatile and cost-effective procedure in the design of DNA origami shapes with stiffness-tunable units.
Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information
NASA Astrophysics Data System (ADS)
Pykhtin, Kirill; Simankina, Tatiana; Sharmanov, Vladimir; Kopytova, Anna
2017-10-01
The danger of injuries and accidents in various industries such as transportation and construction urges the government to control the occupational health and safety more strictly. However, in order to do so with the minimal costs modern risk management tools, have to be implemented. Risk-based approach is an essential tool for competent risk- assessment and used in a great variety of other countries, demonstrating great results in providing of safe working environment. The article describes the problems that the implementation of the method faces in Russia and suggests certain ways to resolve them.
Alphey, Nina; Alphey, Luke; Bonsall, Michael B.
2011-01-01
Vector-borne diseases impose enormous health and economic burdens and additional methods to control vector populations are clearly needed. The Sterile Insect Technique (SIT) has been successful against agricultural pests, but is not in large-scale use for suppressing or eliminating mosquito populations. Genetic RIDL technology (Release of Insects carrying a Dominant Lethal) is a proposed modification that involves releasing insects that are homozygous for a repressible dominant lethal genetic construct rather than being sterilized by irradiation, and could potentially overcome some technical difficulties with the conventional SIT technology. Using the arboviral disease dengue as an example, we combine vector population dynamics and epidemiological models to explore the effect of a program of RIDL releases on disease transmission. We use these to derive a preliminary estimate of the potential cost-effectiveness of vector control by applying estimates of the costs of SIT. We predict that this genetic control strategy could eliminate dengue rapidly from a human community, and at lower expense (approximately US$ 2∼30 per case averted) than the direct and indirect costs of disease (mean US$ 86–190 per case of dengue). The theoretical framework has wider potential use; by appropriately adapting or replacing each component of the framework (entomological, epidemiological, vector control bio-economics and health economics), it could be applied to other vector-borne diseases or vector control strategies and extended to include other health interventions. PMID:21998654
Openstage: A Low-Cost Motorized Microscope Stage with Sub-Micron Positioning Accuracy
Campbell, Robert A. A.; Eifert, Robert W.; Turner, Glenn C.
2014-01-01
Recent progress in intracellular calcium sensors and other fluorophores has promoted the widespread adoption of functional optical imaging in the life sciences. Home-built multiphoton microscopes are easy to build, highly customizable, and cost effective. For many imaging applications a 3-axis motorized stage is critical, but commercially available motorization hardware (motorized translators, controller boxes, etc) are often very expensive. Furthermore, the firmware on commercial motor controllers cannot easily be altered and is not usually designed with a microscope stage in mind. Here we describe an open-source motorization solution that is simple to construct, yet far cheaper and more customizable than commercial offerings. The cost of the controller and motorization hardware are under $1000. Hardware costs are kept low by replacing linear actuators with high quality stepper motors. Electronics are assembled from commonly available hobby components, which are easy to work with. Here we describe assembly of the system and quantify the positioning accuracy of all three axes. We obtain positioning repeatability of the order of in X/Y and in Z. A hand-held control-pad allows the user to direct stage motion precisely over a wide range of speeds ( to ), rapidly store and return to different locations, and execute “jumps” of a fixed size. In addition, the system can be controlled from a PC serial port. Our “OpenStage” controller is sufficiently flexible that it could be used to drive other devices, such as micro-manipulators, with minimal modifications. PMID:24586468
The 3D Elevation Program and America's infrastructure
Lukas, Vicki; Carswell, Jr., William J.
2016-11-07
Infrastructure—the physical framework of transportation, energy, communications, water supply, and other systems—and construction management—the overall planning, coordination, and control of a project from beginning to end—are critical to the Nation’s prosperity. The American Society of Civil Engineers has warned that, despite the importance of the Nation’s infrastructure, it is in fair to poor condition and needs sizable and urgent investments to maintain and modernize it, and to ensure that it is sustainable and resilient. Three-dimensional (3D) light detection and ranging (lidar) elevation data provide valuable productivity, safety, and cost-saving benefits to infrastructure improvement projects and associated construction management. By providing data to users, the 3D Elevation Program (3DEP) of the U.S. Geological Survey reduces users’ costs and risks and allows them to concentrate on their mission objectives. 3DEP includes (1) data acquisition partnerships that leverage funding, (2) contracts with experienced private mapping firms, (3) technical expertise, lidar data standards, and specifications, and (4) most important, public access to high-quality 3D elevation data. The size and breadth of improvements for the Nation’s infrastructure and construction management needs call for an efficient, systematic approach to acquiring foundational 3D elevation data. The 3DEP approach to national data coverage will yield large cost savings over individual project-by-project acquisitions and will ensure that data are accessible for other critical applications.
Use Hardwoods for Building Components
Glenn A. Cooper; William W. Rice
1968-01-01
Describes a system for prefabricating structural units from hardwoods for use in floors, roofs, and walls of a-frame or post-and-beam type construction. The interior face of the unit is decorative paneling; the exterior face is sheathing. Use of the system could reduce prefabricated house construction costs compared to conventional construction costs.
Preservation treatment for wood bridge application
Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf
2009-01-01
Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...
Sabharwal, S; Carter, A W; Rashid, A; Darzi, A; Reilly, P; Gupte, C M
2016-02-01
The aims of this study were to estimate the cost of surgical treatment of fractures of the proximal humerus using a micro-costing methodology, contrast this cost with the national reimbursement tariff and establish the major determinants of cost. A detailed inpatient treatment pathway was constructed using semi-structured interviews with 32 members of hospital staff. Its content validity was established through a Delphi panel evaluation. Costs were calculated using time-driven activity-based costing (TDABC) and sensitivity analysis was performed to evaluate the determinants of cost The mean cost of the different surgical treatments was estimated to be £3282. Although this represented a profit of £1138 against the national tariff, hemiarthroplasty as a treatment choice resulted in a net loss of £952. Choice of implant and theatre staffing were the largest cost drivers. Operating theatre delays of more than one hour resulted in a loss of income Our findings indicate that the national tariff does not accurately represent the cost of treatment for this condition. Effective use of the operating theatre and implant discounting are likely to be more effective cost containment approaches than control of bed-day costs. This cost analysis of fractures of the proximal humerus reinforces the limitations of the national tariff within the English National Health Service, and underlines the importance of effective use of the operating theatre, as well as appropriate implant procurement where controlling costs of treatment is concerned. ©2016 The British Editorial Society of Bone & Joint Surgery.
Cost viability of 3D printed house in UK
NASA Astrophysics Data System (ADS)
Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.
2018-03-01
UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, K.; Paramonov, D.
2002-07-01
IRIS (International Reactor Innovative and Secure) is a small to medium advanced light water cooled modular reactor being developed by an international consortium led by Westinghouse/BNFL. This reactor design is specifically aimed at utilities looking to install new (or replacement) nuclear capacity to match market demands, or at developing countries for their distributed power needs. To determine the optimal configuration for IRIS, analysis was undertaken to establish Generation Costs ($/MWh) and Internal Rate of Return (IRR %) to the Utility at alternative power ratings. This was then combined with global market projections for electricity demand out to 2030, segmented intomore » key geographical regions. Finally this information is brought together to form insights, conclusions and recommendations regarding the optimal design. The resultant analysis reveals a single module sized at 335 MWe, with a construction period of 3 years and a 60-year plant life. Individual modules can be installed in a staggered fashion (3 equivalent to 1005 MWe) or built in pairs (2 sets of twin units' equivalent to 1340 MWe). Uncertainty in Market Clearing Price for electricity, Annual Operating Costs and Construction Costs primarily influence lifetime Net Present Values (NPV) and hence IRR % for Utilities. Generation Costs in addition are also influenced by Fuel Costs, Plant Output, Plant Availability and Plant Capacity Factor. Therefore for a site based on 3 single modules, located in North America, Generations Costs of 28.5 $/MWh are required to achieve an IRR of 20%, a level which enables IRIS to compete with all other forms of electricity production. Plant size is critical to commercial success. Sustained (lifetime) high factors for Plant Output, Availability and Capacity Factor are required to achieve a competitive advantage. Modularity offers Utilities the option to match their investments with market conditions, adding additional capacity as and when the circumstances are right. Construction schedule needs to be controlled. There is a clear trade-off between reducing financing charges and optimising revenue streams. (authors)« less
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
Illumina Unamplified Indexed Library Construction: An Automated Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang
Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.
Policy for equipment’s leasing period extension with minimum cost of maintenance
NASA Astrophysics Data System (ADS)
Lestari, C.; Kurniati, N.
2018-04-01
The cost structure for equipment investment including purchase cost and maintenance cost is getting more expensive. The company considers to lease the equipment instead of purchase it under a contractual agreement. Offering to extend the lease period, following to the base lease period, will provide more benefits for both the lessor (owner) and the lessee (user). Whenever the lease period extension offered at the beginning of the contract, there are some risks in finance e.g. uncertainty of the equipment performance and lessor responsibility. Therefore, this research attempts to model the optimal maintenance policy for lease period extension offered at the end of the contract. Minimal repair is performed to rectify a failed equipment, while imperfect preventive maintenance is conducted to improve the operational state of the equipment when reaches a certain control limit to avoid failures. The mathematical model is constructed to determine the optimal control limit, the number and degree of preventive maintenance, and the multiplication number of the lease period extension. Finally, numerical examples are given to illustrate the influences of the optimal length of the extended lease and the maintenance policy to minimize the maintenance cost.
ERIC Educational Resources Information Center
Kreider, Beth
1997-01-01
Discusses the benefits of dome architecture for a community's middle- and high-school multi-purpose facility. The dome construction is revealed as being cost effective in construction and in maintenance and energy costs. (GR)
Shell Structure Water Cellar’s Rapid Construct Technology
NASA Astrophysics Data System (ADS)
Xian Zhuang, Wen; Qing Yin, De; Chen, Shu Fa
2018-05-01
Tradition concrete water cellar’s problems, such as high cost, long construction term, easy to crack, are pointed out. A new construct method, and it’s matching airbag mould, of constructing concrete shell structure water cellars, are introduced. Combine with full-scale verifying cellar’s construct test, full-load water storage test, analyzed the technology in terms of construction term, cost, crack resistance, air bag pressure etc. It is believed that this new technology can successfully solve the problems that tradition technology has, and it will have a good prospect in rainfall resources utilization.
Characteristics of worker accidents on NYSDOT construction projects.
Mohan, Satish; Zech, Wesley C
2005-01-01
This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2011 CFR
2011-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
NASA Astrophysics Data System (ADS)
Wu, H. Felix; Wan, Yan
2014-03-01
Our nation's infrastructural systems are crumbling. The deteriorating process grows over time. The physical aging of these vital facilities and the remediation of their current critical state pose a key societal challenge to the United States. Current sensing technologies, while well developed in controlled laboratory environments, have not yet yielded tools for producing real-time, in-situ data that are adequately comprehensible for infrastructure decision-makers. The need for advanced sensing technologies is national because every municipality and state in the nation faces infrastructure management challenges. The need is critical because portions of infrastructure are reaching the end of their life-spans and there are few cost-effective means to monitor infrastructure integrity and to prioritize the renovation and replacement of infrastructure elements. New advanced sensing technologies that produce cost-effective inspection and real-time monitoring data, and that can also help or aid in meaningful interpretation of the acquired data, therefore will enhance the safety in regard to the public on structural integrity by issuing timely and accurate alert data for effective maintenance to avoid disasters happening. New advanced sensing technologies also allow more informed management of infrastructural investments by avoiding premature replacement of infrastructure and identifying those structures in need of immediate action to prevent from catastrophic failure. Infrastructure management requires that once a structural defect is detected, an economical and efficient repair be made. Advancing the technologies of repairing infrastructure elements in contact with water, road salt, and subjected to thermal changes requires innovative research to significantly extend the service life of repairs, lower the costs of repairs, and provide repair technologies that are suitable for a wide range of conditions. All these new technologies will provide increased lifetimes, security, and safety of elements of critical infrastructure for the Nation's already deteriorating civil infrastructure. It is envisioned that the Nation should look far beyond: not only should we efficiently and effectively address current problems of the aging infrastructure, but we must also further develop next-generation construction materials and processes for new construction. To accomplish this ambitious goal, we must include process efficiency that will help select the most reliable and cost-effective materials in construction processes; performance and cost will be the prime consideration for selections construction materials based on life-cycle cost and materials performance; energy efficiency will drive reduced energy consumption from current levels by 50 % per unit of output; and environmental responsiveness will achieve net-zero waste from construction materials and its constituents. Should it be successfully implemented, we will transform the current 21st century infrastructure systems to enable the vital functioning of society and improve competitiveness of the economy to ensure that our quality of life remains high.
Intelligent Energy Systems As a Modern Basis For Improving Energy Efficiency
NASA Astrophysics Data System (ADS)
Vidyaev, Igor G.; Ivashutenko, Alexandr S.; Samburskaya, Maria A.
2017-01-01
This work presents data on the share of energy costs in the cost structure for different countries. The information is provided on reducing the use of energy resources by means of introducing the intelligent control systems in the industrial enterprises. The structure and the use of such intelligent systems in the energy industry are under our consideration. It is shown that the constructing an intelligent system should be the strategic direction for the development of the distribution grid complex implying the four main areas for improvement: intellectualization of the equipment, management, communication and automation.
ERIC Educational Resources Information Center
Tickton, Sidney G.; And Others
Summarized in this compendium are approximately 500 ideas being used by colleges and universities in the United States to deal with the problem of energy conservation. These ideas range from suggestions that cost pennies to implement to sophisticated computer controls or the construction of new buildings which incorporate alternative energy…
Hong, Sung Kuk; Choi, Seung Jun; Shin, Saeam; Lee, Wonmok; Pinto, Naina; Shin, Nari; Lee, Kwangjun; Hong, Seong Geun; Kim, Young Ah; Lee, Hyukmin; Kim, Heejung; Song, Wonkeun; Lee, Sun Hwa; Yong, Dongeun; Lee, Kyungwon; Chong, Yunsop
2015-11-01
Quality control (QC) processes are being performed in the majority of clinical microbiology laboratories to ensure the performance of microbial identification and antimicrobial susceptibility testing by using ATCC strains. To obtain these ATCC strains, some inconveniences are encountered concerning the purchase cost of the strains and the shipping time required. This study was focused on constructing a database of reference strains for QC processes using domestic bacterial strains, concentrating primarily on antimicrobial susceptibility testing. Three strains (Escherichia coli, Pseudomonas aeruginosa, and Staphylococcus aureus) that showed legible results in preliminary testing were selected. The minimal inhibitory concentrations (MICs) and zone diameters (ZDs) of eight antimicrobials for each strain were determined according to the CLSI M23. All resulting MIC and ZD ranges included at least 95% of the data. The ZD QC ranges obtained by using the CLSI method were less than 12 mm, and the MIC QC ranges extended no more than five dilutions. This study is a preliminary attempt to construct a bank of Korean QC strains. With further studies, a positive outcome toward cost and time reduction can be anticipated.
1994-06-07
023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to
NASA Astrophysics Data System (ADS)
González, M.; Montaño, M.; Hoyo, C.
2017-01-01
We have constructed a low cost fluorescence detector model to determine the presence of some heavy metals in an aqueous medium. In particular, we focus on metals which cause public health problems in our country. We did the first tests with standard samples of Hg (II). The innovative features of this instrument are its small dimensions (9 dm3) and the low cost of materials used in its construction.
Design and Construction of an Inexpensive Homemade Plant Growth Chamber
Katagiri, Fumiaki; Canelon-Suarez, Dario; Griffin, Kelsey; Petersen, John; Meyer, Rachel K.; Siegle, Megan; Mase, Keisuke
2015-01-01
Plant growth chambers produce controlled environments, which are crucial in making reproducible observations in experimental plant biology research. Commercial plant growth chambers can provide precise controls of environmental parameters, such as temperature, humidity, and light cycle, and the capability via complex programming to regulate these environmental parameters. But they are expensive. The high cost of maintaining a controlled growth environment is often a limiting factor when determining experiment size and feasibility. To overcome the limitation of commercial growth chambers, we designed and constructed an inexpensive plant growth chamber with consumer products for a material cost of $2,300. For a comparable growth space, a commercial plant growth chamber could cost $40,000 or more. Our plant growth chamber had outside dimensions of 1.5 m (W) x 1.8 m (D) x 2 m (H), providing a total growth area of 4.5 m2 with 40-cm high clearance. The dimensions of the growth area and height can be flexibly changed. Fluorescent lights with large reflectors provided a relatively spatially uniform photosynthetically active radiation intensity of 140–250 μmoles/m2/sec. A portable air conditioner provided an ample cooling capacity, and a cooling water mister acted as a powerful humidifier. Temperature, relative humidity, and light cycle inside the chamber were controlled via a z-wave home automation system, which allowed the environmental parameters to be monitored and programmed through the internet. In our setting, the temperature was tightly controlled: 22.2°C±0.8°C. The one-hour average relative humidity was maintained at 75%±7% with short spikes up to ±15%. Using the interaction between Arabidopsis and one of its bacterial pathogens as a test experimental system, we demonstrate that experimental results produced in our chamber were highly comparable to those obtained in a commercial growth chamber. In summary, our design of an inexpensive plant growth chamber will tremendously increase research opportunities in experimental plant biology. PMID:25965420
Design and construction of an inexpensive homemade plant growth chamber.
Katagiri, Fumiaki; Canelon-Suarez, Dario; Griffin, Kelsey; Petersen, John; Meyer, Rachel K; Siegle, Megan; Mase, Keisuke
2015-01-01
Plant growth chambers produce controlled environments, which are crucial in making reproducible observations in experimental plant biology research. Commercial plant growth chambers can provide precise controls of environmental parameters, such as temperature, humidity, and light cycle, and the capability via complex programming to regulate these environmental parameters. But they are expensive. The high cost of maintaining a controlled growth environment is often a limiting factor when determining experiment size and feasibility. To overcome the limitation of commercial growth chambers, we designed and constructed an inexpensive plant growth chamber with consumer products for a material cost of $2,300. For a comparable growth space, a commercial plant growth chamber could cost $40,000 or more. Our plant growth chamber had outside dimensions of 1.5 m (W) x 1.8 m (D) x 2 m (H), providing a total growth area of 4.5 m2 with 40-cm high clearance. The dimensions of the growth area and height can be flexibly changed. Fluorescent lights with large reflectors provided a relatively spatially uniform photosynthetically active radiation intensity of 140-250 μmoles/m2/sec. A portable air conditioner provided an ample cooling capacity, and a cooling water mister acted as a powerful humidifier. Temperature, relative humidity, and light cycle inside the chamber were controlled via a z-wave home automation system, which allowed the environmental parameters to be monitored and programmed through the internet. In our setting, the temperature was tightly controlled: 22.2°C±0.8°C. The one-hour average relative humidity was maintained at 75%±7% with short spikes up to ±15%. Using the interaction between Arabidopsis and one of its bacterial pathogens as a test experimental system, we demonstrate that experimental results produced in our chamber were highly comparable to those obtained in a commercial growth chamber. In summary, our design of an inexpensive plant growth chamber will tremendously increase research opportunities in experimental plant biology.
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
Construction of a low-cost luximeter
NASA Astrophysics Data System (ADS)
Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.
2016-04-01
This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Automated generation of weld path trajectories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sizemore, John M.; Hinman-Sweeney, Elaine Marie; Ames, Arlo Leroy
2003-06-01
AUTOmated GENeration of Control Programs for Robotic Welding of Ship Structure (AUTOGEN) is software that automates the planning and compiling of control programs for robotic welding of ship structure. The software works by evaluating computer representations of the ship design and the manufacturing plan. Based on this evaluation, AUTOGEN internally identifies and appropriately characterizes each weld. Then it constructs the robot motions necessary to accomplish the welds and determines for each the correct assignment of process control values. AUTOGEN generates these robot control programs completely without manual intervention or edits except to correct wrong or missing input data. Most shipmore » structure assemblies are unique or at best manufactured only a few times. Accordingly, the high cost inherent in all previous methods of preparing complex control programs has made robot welding of ship structures economically unattractive to the U.S. shipbuilding industry. AUTOGEN eliminates the cost of creating robot control programs. With programming costs eliminated, capitalization of robots to weld ship structures becomes economically viable. Robot welding of ship structures will result in reduced ship costs, uniform product quality, and enhanced worker safety. Sandia National Laboratories and Northrop Grumman Ship Systems worked with the National Shipbuilding Research Program to develop a means of automated path and process generation for robotic welding. This effort resulted in the AUTOGEN program, which has successfully demonstrated automated path generation and robot control. Although the current implementation of AUTOGEN is optimized for welding applications, the path and process planning capability has applicability to a number of industrial applications, including painting, riveting, and adhesive delivery.« less
Load leveling on industrial refrigeration systems
NASA Astrophysics Data System (ADS)
Bierenbaum, H. S.; Kraus, A. D.
1982-01-01
A computer model was constructed of a brewery with a 2000 horsepower compressor/refrigeration system. The various conservation and load management options were simulated using the validated model. The savings available for implementing the most promising options were verified by trials in the brewery. Result show that an optimized methodology for implementing load leveling and energy conservation consisted of: (1) adjusting (or tuning) refrigeration systems controller variables to minimize unnecessary compressor starts, (2) The primary refrigeration system operating parameters, compressor suction pressure, and discharge pressure are carefully controlled (modulated) to satisfy product quality constraints (as well as in-process material cooling rates and temperature levels) and energy evaluating the energy cost savings associated with reject heat recovery, and (4) a decision is made to implement the reject heat recovery system based on a cost/benefits analysis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Green Energy in New Construction: Maximize Energy Savings and Minimize Cost
ERIC Educational Resources Information Center
Ventresca, Joseph
2010-01-01
People often use the term "green energy" to refer to alternative energy technologies. But green energy doesn't guarantee maximum energy savings at a minimum cost--a common misconception. For school business officials, green energy means getting the lowest energy bills for the lowest construction cost, which translates into maximizing green energy…
A synoptic view of golf course management
NASA Astrophysics Data System (ADS)
Katula, Robert L.
1996-03-01
The maintenance, construction, and redesign of private, public, and municipal golf courses in the United States is a multi-billion dollar industry. The entire golf course maintenance market, according to the National Golf Foundation, was 6.2 billion per year in 1991. The average maintenance cost in the United States was approximately 40,000 per hole per year for the over 15,000 golf courses in the United States in 1991. Golf course maintenance costs have risen 500 percent from 1971 to 1991. These costs are projected to continue to increase at a rate of 8 percent per year due to the demand for quality playing surfaces, increased use of non-potable water, and taxes on water and chemicals required to maintain turfgrass. The golf course construction and redesign market continues to maintain a rate of over 300 new golf courses and redesigned courses completed each year. The average construction costs run from 4 to 6 million and the average redesign costs 2 to 3 million per course. In order to create a perfectly maintained golf course, golf course managers may use as many as 25 different pesticides, fertilizers, and herbicides to control insects and turf disease. Further, turfgrass is often stressed to its limits when kept at the unnatural heights required to obtain firm and fast greens and fairways. The daily practice of living on the edge is often done with limited knowledge of changes taking place on the golf course, of the location of soil types and fertility, of surface and subsurface drainage, and of previous maintenance practices. There is a growing concern in the golf course industry that the concentration of chemicals and water required to maintain today's golf course may endanger ground water supplies for the surrounding ecosystem. This paper will describe the general methodology PTS used to develop a new management system for the maintenance, construction, and redesign of golf courses. The management system integrates remote sensing technology, geographic information systems analysis, and global positioning satellite survey capabilities to bring a total solution to bear on golf courses.
The supply and demand for pollution control: Evidence from wastewater treatment
McConnell, V.D.; Schwarz, G.E.
1992-01-01
This paper analyzes the determination of pollution control from wastewater treatment plants as an economic decision facing local or regional regulators. Pollution control is measured by plant design effluent concentration levels and is fully endogenous in a supply- and-demand model of treatment choice. On the supply side, plant costs are a function of the design treatment level of the plant, and on the demand side, treatment level is a function of both the costs of control and the regional or regulatory preferences for control. We find evidence that the economic model of effluent choice by local regulators has a good deal of explanatory power. We find evidence that wastewater treatment plant removal of biological oxygen demand (BOD) is sensitive to many local factors including the size of the treatment plant, the flow rate of the receiving water, the population density of the surrounding area, regional growth, state sensitivity to environmental issues, state income, and the extent to which the damages from pollution fall on other states. We find strong evidence that regulators are sensitive to capital costs in determining the design level of BOD effluent reduction at a plant. Thus, proposed reductions in federal subsidies for wastewater treatment plant construction are likely to have significant adverse effects on water quality. ?? 1992.
Bove, Allyn M; Smith, Kenneth J; Bise, Christopher G; Fritz, Julie M; Childs, John; Brennan, Gerard P; Abbott, J Haxby; Fitzgerald, G Kelley
2018-01-01
Limited information exists regarding the cost-effectiveness of rehabilitation strategies for individuals with knee osteoarthritis (OA). The study objective was to compare the cost-effectiveness of 4 different combinations of exercise, manual therapy, and booster sessions for individuals with knee OA. This economic evaluation involved a cost-effectiveness analysis performed alongside a multicenter randomized controlled trial. The study took place in Pittsburgh, Pennsylvania; Salt Lake City, Utah; and San Antonio, Texas. The study participants were 300 individuals taking part in a randomized controlled trial investigating various physical therapy strategies for knee OA. Participants were randomized into 4 treatment groups: exercise only (EX), exercise plus booster sessions (EX+B), exercise plus manual therapy (EX+MT), and exercise plus manual therapy and booster sessions (EX+MT+B). For the 2-year base case scenario, a Markov model was constructed using the United States societal perspective and a 3% discount rate for costs and quality-adjusted life years (QALYs). Incremental cost-effectiveness ratios were calculated to compare differences in cost per QALY gained among the 4 treatment strategies. In the 2-year analysis, booster strategies (EX+MT+B and EX+B) dominated no-booster strategies, with both lower health care costs and greater effectiveness. EX+MT+B had the lowest total health care costs. EX+B cost ${\\$}$1061 more and gained 0.082 more QALYs than EX+MT+B, for an incremental cost-effectiveness ratio of ${\\$}$12,900/QALY gained. The small number of total knee arthroplasty surgeries received by individuals in this study made the assessment of whether any particular strategy was more successful at delaying or preventing surgery in individuals with knee OA difficult. Spacing exercise-based physical therapy sessions over 12 months using periodic booster sessions was less costly and more effective over 2 years than strategies not containing booster sessions for individuals with knee OA. © 2017 American Physical Therapy Association
Memory-Scalable GPU Spatial Hierarchy Construction.
Qiming Hou; Xin Sun; Kun Zhou; Lauterbach, C; Manocha, D
2011-04-01
Recent GPU algorithms for constructing spatial hierarchies have achieved promising performance for moderately complex models by using the breadth-first search (BFS) construction order. While being able to exploit the massive parallelism on the GPU, the BFS order also consumes excessive GPU memory, which becomes a serious issue for interactive applications involving very complex models with more than a few million triangles. In this paper, we propose to use the partial breadth-first search (PBFS) construction order to control memory consumption while maximizing performance. We apply the PBFS order to two hierarchy construction algorithms. The first algorithm is for kd-trees that automatically balances between the level of parallelism and intermediate memory usage. With PBFS, peak memory consumption during construction can be efficiently controlled without costly CPU-GPU data transfer. We also develop memory allocation strategies to effectively limit memory fragmentation. The resulting algorithm scales well with GPU memory and constructs kd-trees of models with millions of triangles at interactive rates on GPUs with 1 GB memory. Compared with existing algorithms, our algorithm is an order of magnitude more scalable for a given GPU memory bound. The second algorithm is for out-of-core bounding volume hierarchy (BVH) construction for very large scenes based on the PBFS construction order. At each iteration, all constructed nodes are dumped to the CPU memory, and the GPU memory is freed for the next iteration's use. In this way, the algorithm is able to build trees that are too large to be stored in the GPU memory. Experiments show that our algorithm can construct BVHs for scenes with up to 20 M triangles, several times larger than previous GPU algorithms.
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
Fu, Fang; Zhang, Tao
2016-01-01
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
Aramburo, Javier Morales; Gonzalez, Sigifredo Solano; Toledo, Jorge Toledo
2010-01-01
In biology, materials science, radiography quality control or film dosimetry in radiotherapy, a transmission densitometer is useful for measurements of optical density. The design proposed here is oriented to quality control in radiographic films. The instrument described here utilizes low-cost solid-state devices and is easy to construct. The use of 1-watt white light-emitting diode in this densitometer enables low power consumption and a cold light source. Moreover, the instrument does not need a reference light, which results in decreasing the number of parts and reducing the overall size of the apparatus. PMID:20927222
The Design, Planning and Control of Robotic Systems in Space
NASA Technical Reports Server (NTRS)
Dubowsky, Steven
1996-01-01
In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
When does it pay to invest in a patch? The evolution of intentional niche construction.
Mohlenhoff, Kathryn A; Codding, Brian F
2017-09-01
Humans modify their environments in ways that significantly transform the earth's ecosystems. Recent research suggests that such niche-constructing behaviors are not passive human responses to environmental variation, but instead should be seen as active and intentional management of the environment. Although such research is useful in highlighting the interactive dynamics between humans and their natural world, the niche-construction framework, as currently applied, fails to explain why people would decide to modify their environments in the first place. To help resolve this problem, we use a model of technological intensification to analyze the cost-benefit trade-offs associated with niche construction as a form of patch investment. We use this model to assess the costs and benefits of three paradigmatic cases of intentional niche construction in Western North America: the application of fire in acorn groves, the manufacture of fishing weirs, and the adoption of maize agriculture. Intensification models predict that investing in patch modification (niche construction) only provides a net benefit when the amount of resources needed crosses a critical threshold that makes the initial investment worthwhile. From this, it follows that low-cost investments, such as burning in oak groves, should be quite common, while more costly investments, such as maize agriculture, should be less common and depend on the alternatives available in the local environment. We examine how patterns of mobility, risk management, territoriality, and private property also co-evolve with the costs and benefits of niche construction. This approach illustrates that explaining niche-constructing behavior requires understanding the economic trade-offs involved in patch investment. Integrating concepts from niche construction and technological intensification models within a behavioral ecological framework provides insights into the coevolution and active feedback between adaptive behaviors and environmental change across human history. © 2017 Wiley Periodicals, Inc.
Barnhoorn, Karlijn; Staal, J Bart; van Dongen, Robert Tm; Frölke, Jan Paul M; Klomp, Frank P; van de Meent, Henk; Adang, Eddy; Nijhuis-van der Sanden, Maria Wg
2018-06-01
To analyze cost-effectiveness of Pain Exposure Physical Therapy compared to conventional treatment alongside a randomized controlled trial (NCT00817128) in patients with complex regional pain syndrome type 1, where no clinical difference was shown between the two groups in an intention-to-treat analysis. Randomized controlled trial with 9 months follow-up. Patients were recruited from hospitals and general practitioners in the region around a university hospital. A total of 56 patients, 45 (80.4%) female, were randomized. About 4 patients in the intervention and 11 patients in the conventional group switched groups. The mean (SD) age was 44.3 (16.6) years, and in 37 (66.1%) patients, the upper extremity was affected. Patients received either Pain Exposure Physical Therapy (maximum of five sessions), or conventional treatment conforming with the Dutch multidisciplinary guideline. For the economic evaluation difference between the groups in health-related quality of life (quality-adjusted life years (QALYs)), and the clinical outcomes Impairment level Sum Score-Restricted Version and Pain Disability was determined based on the intention-to-treat analysis as well as differences in both healthcare-related costs and travel expenses. Cost-effectiveness planes were constructed using bootstrapping to compare effects and costs. No significant effects were found for QALYs (mean difference = -0.02; 95% confidence interval (CI) -0.10 to 0.04) and clinical outcomes. A cost minimization analysis showed a significant difference in costs between groups. The conventional treatment was 64% more expensive than the Pain Exposure Physical Therapy. This economic analysis shows that Pain Exposure Physical Therapy compared to conventional treatment is cost-effective.
The Impact of State Regulations on the Costs of Public School Construction
ERIC Educational Resources Information Center
Vincent, Jeffrey M.; Monkkonen, Paavo
2010-01-01
Spending by states and local school districts on school construction has increased dramatically over the last decade, not only because more and higher-quality schools are being built, but also because construction costs have increased by an unprecedented degree. Many states struggle to afford the new schools needed in local communities. The…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wallace, J.D.; Kleinschmidt, R.; Veevers, P.
1995-12-31
Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less
36 CFR 223.111 - Administration of contracts in designated disaster areas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... road or facility, the United States shall bear such increased construction cost if, as determined by... damages are so great that restoration, reconstruction, or construction is not practical under the cost...
Construction engineering inspection direct cost survey.
DOT National Transportation Integrated Search
2014-07-01
The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
Cost analysis of the built environment: the case of bike and pedestrian trials in Lincoln, Neb.
Wang, Guijing; Macera, Caroline A; Scudder-Soucie, Barbara; Schmid, Tom; Pratt, Michael; Buchner, David; Heath, Gregory
2004-04-01
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calculated. Trail length averaged 3.6 miles (range = 1.6-4.6 miles). Annual cost in 2002 dollars ranged from 25,762 to 248,479 (mean = 124,927; median = 171,064). The cost per mile ranged from 5735 to 54,017 (mean = 35,355; median = 37,994). The annual cost per user was 235 (range = 83-592), whereas per capita annual medical cost of inactivity was 622. Construction of trails fits a wide range of budgets and may be a viable health amenity for most communities. To increase trail cost-effectiveness, efforts to decrease cost and increase the number of users should be considered.
Bhatt, Arpit; Zhang, Yimin; Davis, Ryan; ...
2016-07-15
The implementation of the US Renewable Fuel Standard is expected to increase the construction and operation of new biofuel facilities. Allowing this industry to grow without adversely affecting air quality is an important sustainability goal sought by multiple stakeholders. However, little is known about how the emission controls potentially required to comply with air quality regulations might impact biorefinery cost and deployment strategies such as siting and sizing. In this study, we use a baseline design for a lignocellulosic hydrocarbon biofuel production process to assess how the integration of emission controls impacts the minimum fuel selling price (MFSP) of themore » biofuel produced. We evaluate the change in MFSP for two cases as compared to the baseline design by incorporating (i) emission controls that ensure compliance with applicable federal air regulations and (ii) advanced control options that could be used to achieve potential best available control technology (BACT) emission limits. Our results indicate that compliance with federal air regulations can be achieved with minimal impact on biofuel cost (~$0.02 per gasoline gallon equivalent (GGE) higher than the baseline price of $5.10 GGE -1). However, if air emissions must be further reduced to meet potential BACT emission limits, the cost could increase nontrivially. For example, the MFSP could increase to $5.50 GGE -1 by adopting advanced emission controls to meet potential boiler BACT limits. Finally, given tradeoffs among emission control costs, permitting requirements, and economies of scale, these results could help inform decisions about biorefinery siting and sizing and mitigate risks associated with air permitting.« less
Corps of Engineers’ Acquisition of Fish Hatchery Proves Costly.
1981-09-18
location, size, esti- mated cost, design , and construction timetables for facilities needed to meet the steelhead production requirements. To limit...hatchery "* * * is not recognized to be one of the more efficient and productive facilities in Idaho due to obvious con- straints in design , construction...agency’s decision to supply the product or service it- self because it would cost less must be supported by a comparativ , cost analysis. According to Corps
Construction of road network vulnerability evaluation index based on general travel cost
NASA Astrophysics Data System (ADS)
Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin
2018-03-01
With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.
An atmosphere protection subsystem in the thermal power station automated process control system
NASA Astrophysics Data System (ADS)
Parchevskii, V. M.; Kislov, E. A.
2014-03-01
Matters concerned with development of methodical and mathematical support for an atmosphere protection subsystem in the thermal power station automated process control system are considered taking as an example the problem of controlling nitrogen oxide emissions at a gas-and-oil-fired thermal power station. The combined environmental-and-economic characteristics of boilers, which correlate the costs for suppressing emissions with the boiler steam load and mass discharge of nitrogen oxides in analytic form, are used as the main tool for optimal control. A procedure for constructing and applying environmental-and-economic characteristics on the basis of technical facilities available in modern instrumentation and control systems is presented.
A close examination of healthcare expenditures related to fractures.
Kilgore, Meredith L; Curtis, Jeffrey R; Delzell, Elizabeth; Becker, David J; Arora, Tarun; Saag, Kenneth G; Morrisey, Michael A
2013-04-01
This study evaluated reasons for healthcare expenditures both before and after the occurrence of fractures among Medicare beneficiaries. In a previous study we examined healthcare expenditures in the 6 months before and after fractures. The difference-"incremental" expenditures-provides one estimate of the potentially avoidable costs associated with fractures. We constructed a second estimate of the cost burden-"attributable" expenditures-using only those costs recorded in claims with fracture diagnosis codes. Attributable expenditures accounted for only 24% to 60% of incremental expenditures, depending on the fracture site. We examined health care expenditures between 1999 and 2005 among Medicare beneficiaries who experienced fractures (cases) and among beneficiaries who did not experience fractures (controls), matched to cases on age, race, and sex. We also examined healthcare expenditures for cases and controls for 24 months prior to the fracture index date. When expenditures associated with diagnoses for aftercare, joint pain, and osteoporosis, other musculoskeletal diagnoses, pneumonia, and pressure ulcers were included, the proportion of incremental costs directly attributable to fracture care rose to 72% to 88%. Expenditures prior to fracture were higher for cases than controls, and the rate of increase accelerated over the 12 months prior to the hip fracture. Our findings confirm that the original incremental cost analysis constituted a satisfactory method for estimating avoidable costs associated with fractures. We also conclude that those with fractures had much higher and growing healthcare expenditures in the 12 months prior to the event, compared with age-, race-, and sex-matched controls. This suggests that patterns of healthcare services utilization may provide a means to improve fracture prediction rules. Copyright © 2013 American Society for Bone and Mineral Research.
A preliminary analysis of recent HVAC energy projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gaddy, P.J.; Haake, C.F.
A typical Government HVAC design over the last 30 years consisted of two oversized (equal tonnage) electric chillers, two oversized (equal NBTU ratings) boilers, an air economizer cycle, a constant air volume system and a central station pneumatic control system. This typical basic layout for plant design has certain advantages such as simplicity and ease to construct throughout the country. The cookie cutter design/build approach suited federal facilities, when utility costs were not a major consideration, in-house maintenance and operations personnel were plentiful and energy conservation was a moral priority and not an economic concern. Those days are history asmore » energy costs have escalated and operating budgets continue to shrink leaving fewer personnel to maintain the same buildings. Advances in HVAC technology and the reduction in costs for energy efficient systems have finally started affecting the Federal Government`s HVAC replacement and new construction designs. This paper is a brief description of three HVAC projects that go outside the traditional government HVAC design parameters. GSA`s Pacific Rim Region, covering the states of Hawaii, California, Nevada, and Arizona, has implemented three HVAC projects utilizing different technologies not normally found in GSA Federal facilities.« less
Life-cycle Economic and Environmental Effects of Green, Gray and Hybrid Stormwater Infrastructure
NASA Astrophysics Data System (ADS)
Stokes-Draut, J. R.; Taptich, M. N.; Horvath, A.
2016-12-01
Cities throughout the U.S. are seeking efficient ways to manage stormwater for many reasons, including flood control, pollution management, water supply augmentation and to prepare for a changing climate. Traditionally, cities have relied primarily on gray infrastructure, namely sewers, storage and treatment facilities. In these systems, urban runoff, its volume increasing as impervious surfaces expand, is channeled to a wastewater plant where it is mixed with raw sewage prior to treatment or it is discharged, generally untreated, to local water bodies. These facilities are inflexible and expensive to build and maintain. Many systems are deteriorating and/or approaching, if not exceeding, their design capacity. Increasingly, more innovative approaches that integrate stormwater management into the natural environment and that make sense at both local and regional scales are sought. Identifying the best stormwater solution will require evaluating the life-cycle economic costs associated with these alternatives, including costs associated with construction, operation, and maintenance including regulatory and permitting costs, financing, as well as other indirect costs (e.g., avoided wastewater processing or system capacity expansion, increased property value) and non-economic co-benefits (i.e, aesthetics, habitat provision). Beyond conventional life-cycle costing, applying life-cycle assessment (LCA) will contribute to more holistic and sustainable decision-making. LCA can be used to quantitatively track energy use, greenhouse gas emissions, and other environmental effects associated with constructing, operating, and maintaining green and gray infrastructure, including supply chain contributions. We will present the current state of knowledge for implementing life-cycle costing and LCA into stormwater management decisions for green, gray and hybrid infrastructure.
United States Air Force Agency Financial Report 2014
2014-01-01
basic sciences and 45 semester hours in humanities and social sciences . This 90 semester hour total comprises 60 percent of the total academic...Test and Evaluation Support $723 F-35 $628 Defense Research Sciences $373 GPS III-Operational Control Segment $373 Long Range Strike Bomber $359...Development, Test & Evaluation Family Housing & Military Construction (Less: Earned Revenue) Net Cost before Losses/ (Gains) from Actuarial Assumption
Two Undergraduate Projects for Data Acquisition and Control
NASA Astrophysics Data System (ADS)
Hiersche, Kelly; Pena, Tara; Grogan, Tanner; Wright, Matthew
We are designing two separate instruments for use in our undergraduate laboratory. In the first project, a Raspberry Pi is used to simultaneously monitor a large number of current and voltage readings and store them in a database. In our second project, we are constructing our own microcontrollers to work as a general-purpose interface based off work carried out in Review of Scientific Instruments 84, 103101 (2013). It was designed for low cost and simple construction, making it ideal for undergraduate level work. This circuit has room for two interchangeable daughter boards, giving it the capability to work as a general lab interface, lock-in detector, or waveform generator.
Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.
Construction of a fast, inexpensive rapid-scanning diode-array detector and spectrometer.
Carter, T P; Baek, H K; Bonninghausen, L; Morris, R J; van Wart, H E
1990-10-01
A 512-element diode-array spectroscopic detection system capable of acquiring multiple spectra at a rate of 5 ms per spectrum with an effective scan rate of 102.9 kHz has been constructed. Spectra with fewer diode elements can also be acquired at scan rates up to 128 kHz. The detector utilizes a Hamamatsu silicon photodiode-array sensor that is interfaced to Hamamatsu driver/amplifier and clock generator boards and a DRA laboratories 12-bit 160-kHz analog-to-digital converter. These are standard, commercially available devices which cost approximately $3500. The system is interfaced to and controlled by an IBM XT microcomputer. Detailed descriptions of the home-built detector housing and control/interface circuitry are presented and its application to the study of the reaction of horseradish peroxidase with hydrogen peroxide is demonstrated.
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
NASA Astrophysics Data System (ADS)
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Low-cost satellite mechanical design and construction
NASA Astrophysics Data System (ADS)
Boisjolie-Gair, Nathaniel; Straub, Jeremy
2017-05-01
This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.
STANDARDIZED COSTS FOR WATER SUPPLY DISTRIBUTION SYSTEMS
Presented within the report are cost data for construction and operation/maintenance of domestic water distribution and transmission pipelines, domestic water pumping stations, and domestic water storage reservoirs. To allow comparison of new construction with rehabilitation of e...
Gachango, F G; Pedersen, S M; Kjaergaard, C
2015-12-01
Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis
NASA Technical Reports Server (NTRS)
Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven
1997-01-01
Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.
[Cost at the first level of care].
Villarreal-Ríos, E; Montalvo-Almaguer, G; Salinas-Martínez, M; Guzmán-Padilla, J E; Tovar-Castillo, N H; Garza-Elizondo, M E
1996-01-01
To estimate the unit cost of 15 causes of demand for primary care per health clinic in an institutional (social security) health care system, and to determine the average cost at the state level. The cost of 80% of clinic visits was estimated in 35 of 40 clinics in the social security health care system in the state of Nuevo Leon, Mexico. The methodology for fixed costs consisted of: departmentalization, inputs, cost, weights and construction of matrices. Variable costs were estimated for standard patients by type of health care sought and with the consensus of experts; the sum of fixed and variable costs gave the unit cost. A computerized model was employed for data processing. A large variation in unit cost was observed between health clinics studied for all causes of demand, in both metropolitan and non-metropolitan areas. Prenatal care ($92.26) and diarrhea ($93.76) were the least expensive while diabetes ($240.42) and hypertension ($312.54) were the most expensive. Non-metropolitan costs were higher than metropolitan costs (p < 0.05); controlling for number of physician's offices showed that this was determined by medical units with only one physician's office. Knowledge of unit costs is a tool that, when used by medical administrators, allows adequate health care planning and efficient allocation of health resources.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Major
The use of stationary gas turbines for power generation has been growing rapidly with continuing trends predicted well into the future. Factors that are contributing to this growth include advances in turbine technology, operating and siting flexibility and low capital cost. Restructuring of the electric utility industry will provide new opportunities for on-site generation. In a competitive market, it maybe more cost effective to install small distributed generation units (like gas turbines) within the grid rather than constructing large power plants in remote locations with extensive transmission and distribution systems. For the customer, on-site generation will provide added reliability andmore » leverage over the cost of purchased power One of the key issues that is addressed in virtually every gas turbine application is emissions, particularly NO{sub x} emissions. Decades of research and development have significantly reduced the NO{sub x} levels emitted from gas turbines from uncontrolled levels. Emission control technologies are continuing to evolve with older technologies being gradually phased-out while new technologies are being developed and commercialized. The objective of this study is to determine and compare the cost of NO{sub x} control technologies for three size ranges of stationary gas turbines: 5 MW, 25 MW and 150 MW. The purpose of the comparison is to evaluate the cost effectiveness and impact of each control technology as a function of turbine size. The NO{sub x} control technologies evaluated in this study include: Lean premix combustion, also known as dry low NO{sub x} (DLN) combustion; Catalytic combustion; Water/steam injection; Selective catalytic reduction (SCR)--low temperature, conventional, high temperature; and SCONO{sub x}{trademark}.« less
Construction of VLCC marine oil storage cost index system
NASA Astrophysics Data System (ADS)
Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen
2018-04-01
VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.
Self-optimization and auto-stabilization of receiver in DPSK transmission system.
Jang, Y S
2008-03-17
We propose a self-optimization and auto-stabilization method for a 1-bit DMZI in DPSK transmission. Using the characteristics of eye patterns, the optical frequency transmittance of a 1-bit DMZI is thermally controlled to maximize the power difference between the constructive and destructive output ports. Unlike other techniques, this control method can be realized without additional components, making it simple and cost effective. Experimental results show that error-free performance is maintained when the carrier optical frequency variation is approximately 10% of the data rate.
NASA Astrophysics Data System (ADS)
Chowdhury, Md Mukul
With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.
The design and construction of a cost-efficient confocal laser scanning microscope
NASA Astrophysics Data System (ADS)
Xi, Peng; Rajwa, Bartlomiej; Jones, James T.; Robinson, J. Paul
2007-03-01
The optical dissection ability of confocal microscopy makes it a powerful tool for biological materials. However, the cost and complexity of confocal scanning laser microscopy hinders its wide application in education. We describe the construction of a simplified confocal scanning laser microscope and demonstrate three-dimensional projection based on cost-efficient commercial hardware, together with available open source software.
New Opportunities of Low-Cost Photogrammetry for Culture Heritage Preservation
NASA Astrophysics Data System (ADS)
Shults, R.
2017-05-01
In the paper, the questions of using the technologies of low-cost photogrammetry in combination with the additional capabilities of modern smartphones are considered. The research was carried out on the example of documenting the historical construction of the II World War - the Kiev Fortified Region. Brief historical information about the object of research is given. The possibilities of using modern smartphones as measuring instruments are considered. To get high-quality results, the camera of the smartphone was calibrated. The calibration results were used in the future to perform 3D modeling of defense facilities. Photographing of three defense structures in a different state: destroyed, partially destroyed and operating was carried out. Based on the results of photography using code targets, 3D object models were constructed. To verify the accuracy of the 3D modelling, control measurements of the lines between the code targets at the objects were performed. The obtained results are satisfying, and the technology considered in the paper can be recommended for use in performing archaeological and historical studies.
Rapid Leaf Deployment Strategies in a Deciduous Savanna
2016-01-01
Deciduous plants avoid the costs of maintaining leaves in the unfavourable season, but carry the costs of constructing new leaves every year. Deciduousness is therefore expected in ecological situations with pronounced seasonality and low costs of leaf construction. In our study system, a seasonally dry tropical savanna, many trees are deciduous, suggesting that leaf construction costs must be low. Previous studies have, however, shown that nitrogen is limiting in this system, suggesting that leaf construction costs are high. Here we examine this conundrum using a time series of soil moisture availability, leaf phenology and nitrogen distribution in the tree canopy to illustrate how trees resorb nitrogen before leaf abscission and use stored reserves of nitrogen and carbon to construct new leaves at the onset of the growing season. Our results show that trees deployed leaves shortly before and in anticipation of the first rains with its associated pulse of nitrogen mineralisation. Our results also show that trees rapidly constructed a full canopy of leaves within two weeks of the first rains. We detected an increase in leaf nitrogen content that corresponded with the first rains and with the movement of nitrogen to more distal branches, suggesting that stored nitrogen reserves are used to construct leaves. Furthermore the stable carbon isotope ratios (δ13C) of these leaves suggest the use of stored carbon for leaf construction. Our findings suggest that the early deployment of leaves using stored nitrogen and carbon reserves is a strategy that is integrally linked with the onset of the first rains. This strategy may confer a competitive advantage over species that deploy leaves at or after the onset of the rains. PMID:27310398
Highway construction cost comparison survey : final report
DOT National Transportation Integrated Search
2002-04-01
Over the past few years the Washington State Department of Transportation (WSDOT) has been asked numerous questions related to the cost of highway construction in Washington State as compared to other states. In order to address these questions, WSDO...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
DOT National Transportation Integrated Search
1999-05-01
This paper uses Federal Aid Highway program information for 1990 to 1994 to define a natural experiment that evaluates whether compliance with federal environmental regulations increases construction costs. This is accomplished by considering whether...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
Papercrete brick as an alternate building material to control Environmental Pollution
NASA Astrophysics Data System (ADS)
Sudarsan, J. S.; Ramesh, S.; Jothilingam, M.; Ramasamy, Vishalatchi; Rajan, Rajitha J.
2017-07-01
Utilization of concrete in the construction industry is increasing day by day. The increasing demand for concrete in the future is the major issue, for which an alternate option is to find out at a reduced or no additional cost and to reduce the environmental impact due to increase of cement industries that are important ingredient to economic development. It turns out urgent to find out alternate for the partial replacement of concrete and cement, as natural sources of aggregates are becoming exhausted. As large quantity of paper waste is generated from different countries all over the world which causes serious environmental problems, So in this present study abandoned paper waste was used as a partial replacement material in concrete,. Study indicates that 80% of the construction cost of a building was contributed by building material and still millions of people in developing countries like India are not able to afford the cost of construction of house. This study is based on potential use of light weight composite brick as a building material and potential use of paper waste for producing at low-cost. Experimental investigation was carried out to analyse optimization of mix for papercrete bricks depending upon the water absorption, compressive strength and unit weight. Papercrete bricks were prepared out of waste paper, and quarry dust with partial replacement of cement by another industrial by-product Fly Ash in varying proportions of 25%, 40% and 55%. The properties like mechanical strength, standard quality comparisons with the conventional bricks through standard tests like hardness, soundness, fire resistance and Cost-Benefit Analysis were performed and studied. The specimens of dimension 230mm x 110mm x 80mm were subjected to 7 Days and 28 days air curing and sun drying before tests were performed on them. Based on the study it was found that for non-load bearing walls papercrete bricks are best suited.
Building a 40% Energy Saving House in the Mixed-Humid Climate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christian, Jeffrey E; Bonar, Jacob
2011-10-01
This report describes a home that uses 40% less energy than the energy-efficient Building America standard - a giant step in the pursuit of affordable near-zero-energy housing through the evolution of five near-zero-energy research houses. This four-bedroom, two-bath, 1232-ft2 house has a Home Energy Rating System (HERS) index of 35 (a HERS rating of 0 is a zero-energy house, a conventional new house would have a HERS rating of 100), which qualifies it for federal energy efficiency and solar incentives. The house is leading to the planned construction of a similar home in Greensburg, Kansas, and 21 staff houses inmore » the Walden Reserve, a 7000-unit "deep green" community in Cookville, Tennessee. Discussions are underway for construction of similar houses in Charleston, South Carolina, Seattle, Washington, Knoxville and Oak Ridge, Tennessee, and upstate New York. This house should lead to a 40% and 50% Gate-3, Mixed-Humid-Climate Joule for the DOE Building America Program. The house is constructed with structurally-insulated-panel walls and roof, raised metal-seam roof with infrared reflective coating, airtight envelope (1.65 air changes per hour at 50 Pascal), supply mechanical ventilation, ducts inside the conditioned space, extensive moisture control package, foundation geothermal space heating and cooling system, ZEHcor wall, solar water heater, and a 2.2 kWp grid-connected photovoltaic (PV) system. The detailed specifications for the envelope and the equipment used in ZEH5 compared to all the houses in this series are shown in Tables 1 and 2. Based on a validated computer simulation of ZEH5 with typical occupancy patterns and energy services for four occupants, energy for this all-electric house is predicted to cost only $0.66/day ($0.86/day counting the hookup charges). By contrast, the benchmark house would require $3.56/day, including hookup charges (these costs are based on a 2006 residential rates of $0.07/kWh and solar buyback at $0.15/kWh). The solar fraction for this home located in Lenoir City, Tennessee, is predicted to be as high as 41%(accounting for both solar PV and the solar water heater). This all-electric home is predicted to use 25 kWh/day based on the one year of measured data used to calibrate a whole-building simulation model. Based on two years of measured data, the roof-mounted 2.2 kWp PV system is predicted to generate 7.5 kWh/day. The 2005 cost to commercially construct ZEH5, including builder profit and overhead, is estimated at about $150,000. This cost - for ZEH5's panelized construction, premanufactured utility wall (ZEHcor), foundation geothermal system, and the addition of the walkout lower level, and considering the falling cost for PV - suggests that the construction cost per ft2 for a ZEH5 two-story will be even more cost-competitive. The 2005 construction cost estimate for a finished-out ZEH5 with 2632 ft2 is $222,000 or $85/ft2. The intention of this report is to help builders and homeowners make the decision to build zero-energy-ready homes. Detailed drawings, specifications, and lessons learned in the construction and analysis of data from about 100 sensors monitoring thermal performance for a one-year period are presented. This information should be specifically useful to those considering structural insulated panel walls and roof, foundation geothermal space heating and cooling, solar water heater and roof-mounted, photovoltaic, grid-tied systems.« less
Relative Economy of Different Methods of Airplane Construction
NASA Technical Reports Server (NTRS)
Herrmann, H
1931-01-01
A comparison of the relative economy of airplane construction shows that monoplanes are cheaper than biplanes; that all-metal construction is much more expensive than mixed construction; that multi-engine airplanes are more expensive than single-engine types of the same carrying capacity and speed;that the cost of airplanes is materially reduced by increasing their size without increasing the number of engines. The greatest economy usually coincides with the best aerodynamic and static conditions and the cost is always increased by safety requirements.
A low cost, high performance remotely controlled backhoe/excavator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rizzo, J.
1995-12-31
This paper addresses a state of the art, low cost, remotely controlled backhoe/excavator system for remediation use at hazardous waste sites. The all weather, all terrain, Remote Dig-It is based on a simple, proven construction platform and incorporates state of the art sensors, control, telemetry and other subsystems derived from advanced underwater remotely operated vehicle systems. The system can be towed to a site without the use of a trailer, manually operated by an on board operator or operated via a fiber optic or optional RF communications link by a remotely positioned operator. A proportional control system is piggy backedmore » onto the standard manual control system. The control system improves manual operation, allows rapid manual/remote mode selection and provides fine manual or remote control of all functions. The system incorporates up to 4 separate video links, acoustic obstacle proximity sensors, and stereo audio pickups and an optional differential GPS navigation. Video system options include electronic panning and tilting within a distortion-corrected wide angle field of view. The backhoe/excavator subsystem has a quick disconnect interface feature which allows its use as a manipulator with a wide variety of end effectors and tools. The Remote Dig-It was developed to respond to the need for a low-cost, effective remediation system for use at sites containing hazardous materials. The prototype system was independently evaluated for this purpose by the Army at the Jefferson Proving Ground where it surpassed all performance goals. At the time of this writing, the Remote Dig-It system is currently the only backhoe/excavator which met the Army`s goals for remediation systems for use at hazardous waste sites and it costs a fraction of any known competing offerings.« less
Watkins, David; Lubinga, Solomon J; Mayosi, Bongani; Babigumira, Joseph B
2016-08-01
Rheumatic heart disease (RHD) prevalence and mortality rates remain especially high in many parts of Africa. While effective prevention and treatment exist, coverage rates of the various interventions are low. Little is known about the comparative cost-effectiveness of different RHD interventions in limited resource settings. We developed an economic evaluation tool to assist ministries of health in allocating resources and planning RHD control programs. We constructed a Markov model of the natural history of acute rheumatic fever (ARF) and RHD, taking transition probabilities and intervention effectiveness data from previously published studies and expert opinion. Our model estimates the incremental cost-effectiveness of scaling up coverage of primary prevention (PP), secondary prevention (SP) and heart valve surgery (VS) interventions for RHD. We take a healthcare system perspective on costs and measure outcomes as disability-adjusted life-years (DALYs), discounting both at 3%. Univariate and probabilistic sensitivity analyses are also built into the modeling tool. We illustrate the use of this model in a hypothetical low-income African country, drawing on available disease burden and cost data. We found that, in our hypothetical country, PP would be cost saving and SP would be very cost-effective. International referral for VS (e.g., to a country like India that has existing surgical capacity) would be cost-effective, but building in-country VS services would not be cost-effective at typical low-income country thresholds. Our cost-effectiveness analysis tool is designed to inform priorities for ARF/RHD control programs in Africa at the national or subnational level. In contrast to previous literature, our preliminary findings suggest PP could be the most efficient and cheapest approach in poor countries. We provide our model for public use in the form of a Supplementary File. Our research has immediate policy relevance and calls for renewed efforts to scale up RHD prevention.
NASA Astrophysics Data System (ADS)
Kurdhi, N. A.; Jamaluddin, A.; Jauhari, W. A.; Saputro, D. R. S.
2017-06-01
In this study, we consider a stochastic integrated manufacturer-retailer inventory model with service level constraint. The model analyzed in this article considers the situation in which the vendor and the buyer establish a long-term contract and strategic partnership to jointly determine the best strategy. The lead time and setup cost are assumed can be controlled by an additional crashing cost and an investment, respectively. It is assumed that shortages are allowed and partially backlogged on the buyer’s side, and that the protection interval (i.e., review period plus lead time) demand distribution is unknown but has given finite first and second moments. The objective is to apply the minmax distribution free approach to simultaneously optimize the review period, the lead time, the setup cost, the safety factor, and the number of deliveries in order to minimize the joint total expected annual cost. The service level constraint guarantees that the service level requirement can be satisfied at the worst case. By constructing Lagrange function, the analysis regarding the solution procedure is conducted, and a solution algorithm is then developed. Moreover, a numerical example and sensitivity analysis are given to illustrate the proposed model and to provide some observations and managerial implications.
Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawab, Jamshaid; Lim, Ing; Mo, Yi-Lung
Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments andmore » mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.« less
NASA Astrophysics Data System (ADS)
Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad
2017-11-01
Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
DOT National Transportation Integrated Search
2003-04-01
The Louisiana Department of Transportation and Development (LADOTD) is interested in applying the Federal Highway Administration=s (FHWA) life cycle cost analysis procedures and model to large roadway construction, maintenance, and rehabilitation pro...
Li, Xuanying; Li, Xiaotong; Hu, Cheng
2017-12-01
In this paper, without transforming the second order inertial neural networks into the first order differential systems by some variable substitutions, asymptotic stability and synchronization for a class of delayed inertial neural networks are investigated. Firstly, a new Lyapunov functional is constructed to directly propose the asymptotic stability of the inertial neural networks, and some new stability criteria are derived by means of Barbalat Lemma. Additionally, by designing a new feedback control strategy, the asymptotic synchronization of the addressed inertial networks is studied and some effective conditions are obtained. To reduce the control cost, an adaptive control scheme is designed to realize the asymptotic synchronization. It is noted that the dynamical behaviors of inertial neural networks are directly analyzed in this paper by constructing some new Lyapunov functionals, this is totally different from the traditional reduced-order variable substitution method. Finally, some numerical simulations are given to demonstrate the effectiveness of the derived theoretical results. Copyright © 2017 Elsevier Ltd. All rights reserved.
Construction costs, payback times, and the leaf economics of carnivorous plants.
Karagatzides, Jim D; Ellison, Aaron M
2009-09-01
Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.
Drawing Inspiration from Human Brain Networks: Construction of Interconnected Virtual Networks
Kominami, Daichi; Leibnitz, Kenji; Murata, Masayuki
2018-01-01
Virtualization of wireless sensor networks (WSN) is widely considered as a foundational block of edge/fog computing, which is a key technology that can help realize next-generation Internet of things (IoT) networks. In such scenarios, multiple IoT devices and service modules will be virtually deployed and interconnected over the Internet. Moreover, application services are expected to be more sophisticated and complex, thereby increasing the number of modifications required for the construction of network topologies. Therefore, it is imperative to establish a method for constructing a virtualized WSN (VWSN) topology that achieves low latency on information transmission and high resilience against network failures, while keeping the topological construction cost low. In this study, we draw inspiration from inter-modular connectivity in human brain networks, which achieves high performance when dealing with large-scale networks composed of a large number of modules (i.e., regions) and nodes (i.e., neurons). We propose a method for assigning inter-modular links based on a connectivity model observed in the cerebral cortex of the brain, known as the exponential distance rule (EDR) model. We then choose endpoint nodes of these links by controlling inter-modular assortativity, which characterizes the topological connectivity of brain networks. We test our proposed methods using simulation experiments. The results show that the proposed method based on the EDR model can construct a VWSN topology with an optimal combination of communication efficiency, robustness, and construction cost. Regarding the selection of endpoint nodes for the inter-modular links, the results also show that high assortativity enhances the robustness and communication efficiency because of the existence of inter-modular links of two high-degree nodes. PMID:29642483
Drawing Inspiration from Human Brain Networks: Construction of Interconnected Virtual Networks.
Murakami, Masaya; Kominami, Daichi; Leibnitz, Kenji; Murata, Masayuki
2018-04-08
Virtualization of wireless sensor networks (WSN) is widely considered as a foundational block of edge/fog computing, which is a key technology that can help realize next-generation Internet of things (IoT) networks. In such scenarios, multiple IoT devices and service modules will be virtually deployed and interconnected over the Internet. Moreover, application services are expected to be more sophisticated and complex, thereby increasing the number of modifications required for the construction of network topologies. Therefore, it is imperative to establish a method for constructing a virtualized WSN (VWSN) topology that achieves low latency on information transmission and high resilience against network failures, while keeping the topological construction cost low. In this study, we draw inspiration from inter-modular connectivity in human brain networks, which achieves high performance when dealing with large-scale networks composed of a large number of modules (i.e., regions) and nodes (i.e., neurons). We propose a method for assigning inter-modular links based on a connectivity model observed in the cerebral cortex of the brain, known as the exponential distance rule (EDR) model. We then choose endpoint nodes of these links by controlling inter-modular assortativity, which characterizes the topological connectivity of brain networks. We test our proposed methods using simulation experiments. The results show that the proposed method based on the EDR model can construct a VWSN topology with an optimal combination of communication efficiency, robustness, and construction cost. Regarding the selection of endpoint nodes for the inter-modular links, the results also show that high assortativity enhances the robustness and communication efficiency because of the existence of inter-modular links of two high-degree nodes.
ERIC Educational Resources Information Center
Lowe, N. K., Ed.
This document provides technical information and simple instructions for constructing 84 different pieces of science equipment. Each entry includes: (1) name of item; (2) purpose of the equipment; (3) person who submitted the information; (4) line drawing of prototype; (5) list of low-cost materials needed; (6) construction procedures; (7)…
J. N. Kochenderfer; G. W. Wendel; H. Clay Smith
1984-01-01
A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...
Applicability of Thermal Storage Systems to Air Force Facilities
1990-09-01
Analisis of Region 6 Upper Limit Retrofit Scenario 30% Reduction .... ............. 4.52 4.58 Economic Analysis of Region 7 Upper Limit Retrofit Scenario...or a dynamic-direct contact type. They usually include all the controls, chilling and storage equipment in one self-contained, skid mounted, factory ...SCS technology. One promising trend in reducing system construction costs is the factory -packaged thermal storage cooling unit. As of February 1989
NASA Technical Reports Server (NTRS)
Parrish, E. A., Jr.; Aylor, J. H.
1975-01-01
To aid work being conducted on the feasibility of a low cost Omega navigational receiver, a control panel was designed and constructed according to supplied specifications. Since the proposed Omega receiver is designed around a microprocessor, software engineering necessary for control panel operation is included in the design. The control panel is to be used as an operational model for use in the design of a prototype receiver. A detailed description of the hardware design is presented along with a description of the software needed to operate the panel. A complete description of the operating procedures for the panel are also included.
NASA Technical Reports Server (NTRS)
Gordon, Steven C.
1993-01-01
Spacecraft in orbit near libration point L1 in the Sun-Earth system are excellent platforms for research concerning solar effects on the terrestrial environment. One spacecraft mission launched in 1978 used an L1 orbit for nearly 4 years, and future L1 orbital missions are also being planned. Orbit determination and station-keeping are, however, required for these orbits. In particular, orbit determination error analysis may be used to compute the state uncertainty after a predetermined tracking period; the predicted state uncertainty levels then will impact the control costs computed in station-keeping simulations. Error sources, such as solar radiation pressure and planetary mass uncertainties, are also incorporated. For future missions, there may be some flexibility in the type and size of the spacecraft's nominal trajectory, but different orbits may produce varying error analysis and station-keeping results. The nominal path, for instance, can be (nearly) periodic or distinctly quasi-periodic. A periodic 'halo' orbit may be constructed to be significantly larger than a quasi-periodic 'Lissajous' path; both may meet mission requirements, but perhaps the required control costs for these orbits are probably different. Also for this spacecraft tracking and control simulation problem, experimental design methods can be used to determine the most significant uncertainties. That is, these methods can determine the error sources in the tracking and control problem that most impact the control cost (output); it also produces an equation that gives the approximate functional relationship between the error inputs and the output.
NASA Astrophysics Data System (ADS)
Chu, S. Y.; Hwang, Y. J.; Choi, S.; Na, J. B.; Kim, Y. J.; Chang, K. S.; Bae, D. K.; Lee, C. Y.; Ko, T. K.
2011-11-01
A high speed electromagnetic suspension (EMS) maglev has emerged as the solution to speed limit problem that conventional high-speed railroad has. In the EMS maglev, small levitation gap needs uniform guide-way which leads to increase the construction cost. The large levitation gap can reduce the construction cost. However it is hard for normal conducting electromagnet to produce larger magneto-motive force (MMF) for generating levitation force as increased levitation gap. This is because normal conductors have limited rating current to their specific volume. Therefore, the superconducting electromagnet can be one of the solutions for producing both large levitation gap and sufficient MMF. The superconducting electromagnets have incomparably high allowable current density than what normal conductors have. In this paper, the prototype of high temperature superconducting (HTS) electromagnets were designed and manufactured applicable to hybrid electromagnetic suspension system (H-EMS). The H-EMS consists of control coils for levitation control and superconducting coils for producing MMF for levitation. The required MMF for generating given levitation force was calculated by both equations of ideal U-core magnet and magnetic field analysis using the finite element method (FEM). The HTS electromagnets were designed as double pancakes with Bi-2223/Ag tapes. Experiments to confirm its operating performance were performed in liquid nitrogen (LN2).
Ruiz, Juan Gabriel; Charpak, Nathalie; Castillo, Mario; Bernal, Astrid; Ríos, John; Trujillo, Tammy; Córdoba, María Adelaida
2017-06-01
Although kangaroo mother care (KMC) has been shown to be safe and effective in randomized controlled trials (RCTs), there are no published complete economic evaluations including the three components of the full intervention. A cost utility analysis performed on the results of an RCT conducted in Bogotá, Colombia between 1993 and 1996. Hospital and ambulatory costs were estimated by microcosting in a sample of preterm infants from a University Hospital in Bogotá in 2011 and at a KMC clinic in the same period. Utility scores were assigned by experts by means of (1) direct ordering and scoring discrete health states and (2) constructing a multi-attribute utility function. Ninety-five percent confidence intervals (CIs) for the incremental cost-utility ratios (ICURs) were computed by the Fiellers theorem method. One-way sensitivity analysis on price estimates for valuing costs was performed. ICUR at 1 year of corrected age was $ -1,546 per extra quality-adjusted life year gained using the KMC method (95% CI $ -7,963 to $ 4,910). In Bogotá, the use of KMC is dominant: more effective and cost-saving. Although results from an economic analysis should not be extrapolated to different systems and communities, this dominant result suggests that KMC could be cost-effective in similar low and middle income countries settings. Copyright © 2016 Elsevier Inc. All rights reserved.
Estimating procedure for major highway construction bid item cost : final report.
DOT National Transportation Integrated Search
1978-06-01
The present procedure for estimating construction bid item cost makes use of the quarterly weighted average unit price report coupled with engineering judgement. The limitation to this method is that this report format provides only the lowest bid da...
Azman, Andrew S; Golub, Jonathan E; Dowdy, David W
2014-10-30
Current approaches are unlikely to achieve the aggressive global tuberculosis (TB) control targets set for 2035 and beyond. Active case finding (ACF) may be an important tool for augmenting existing strategies, but the cost-effectiveness of ACF remains uncertain. Program evaluators can often measure the cost of ACF per TB case detected, but how this accessible measure translates into traditional metrics of cost-effectiveness, such as the cost per disability-adjusted life year (DALY), remains unclear. We constructed dynamic models of TB in India, China, and South Africa to explore the medium-term impact and cost-effectiveness of generic ACF activities, conceptualized separately as discrete (2-year) campaigns and as continuous activities integrated into ongoing TB control programs. Our primary outcome was the cost per DALY, measured in relationship to the cost per TB case actively detected and started on treatment. Discrete campaigns costing up to $1,200 (95% uncertainty range [UR] 850-2,043) per case actively detected and started on treatment in India, $3,800 (95% UR 2,706-6,392) in China, and $9,400 (95% UR 6,957-13,221) in South Africa were all highly cost-effective (cost per DALY averted less than per capita gross domestic product). Prolonged integration was even more effective and cost-effective. Short-term assessments of ACF dramatically underestimated potential longer term gains; for example, an assessment of an ACF program at 2 years might find a non-significant 11% reduction in prevalence, but a 10-year evaluation of that same intervention would show a 33% reduction. ACF can be a powerful and highly cost-effective tool in the fight against TB. Given that short-term assessments may dramatically underestimate medium-term effectiveness, current willingness to pay may be too low. ACF should receive strong consideration as a basic tool for TB control in most high-burden settings, even when it may cost over $1,000 to detect and initiate treatment for each extra case of active TB.
Edmundson, Matthew Charles; Horsfall, Louise
2015-01-01
Arsenic is a widespread contaminant of both land and water around the world. Current methods of decontamination such as phytoremediation and chemical adsorbents can be resource and time intensive, and may not be suitable for some areas such as remote communities where cost and transportation are major issues. Bacterial decontamination, with strict controls preventing environmental release, may offer a cost-effective alternative or provide a financial incentive when used in combination with other remediation techniques. In this study, we have produced Escherichia coli strains containing arsenic-resistance genes from a number of sources, overexpressing them and testing their effects on arsenic resistance. While the lab E. coli strain JM109 (the “wild-type”) is resistant up to 20 mM sodium arsenate, the strain containing our plasmid pEC20 is resistant up to 80 mM. When combined with our construct pArsRBCC arsenic-containing nanoparticles were observed at the cell surface; the elements of pEC20 and pArsRBCC were therefore combined in a modular construct, pArs, in order to evaluate the roles and synergistic effects of the components of the original plasmids in arsenic resistance and nanoparticle formation. We have also investigated introducing the lac operator in order to more tightly control expression from pArs. We demonstrate that our strains are able to reduce toxic forms of arsenic into stable, insoluble metallic As(0), providing one way to remove arsenate contamination, and which may also be of benefit for other heavy metals. PMID:26539432
Fluid management in the optimization of space construction
NASA Technical Reports Server (NTRS)
Snyder, Howard
1990-01-01
Fluid management impacts strongly on the optimization of space construction. Large quantities of liquids are needed for propellants and life support. The mass of propellant liquids is comparable to that required for the structures. There may be a strong dynamic interaction between the stored liquids and the space structure unless the design minimizes the interaction. The constraints of cost and time required optimization of the supply/resupply strategy. The proper selection and design of the fluid management methods for: slosh control; stratification control; acquisition; transfer; gauging; venting; dumping; contamination control; selection of tank configuration and size; the storage state and the control system can improve the entire system performance substantially. Our effort consists of building mathematical/computer models of the various fluid management methods and testing them against the available experimental data. The results of the models are used as inputs to the system operations studies. During the past year, the emphasis has been on modeling: the transfer of cryogens; sloshing and the storage configuration. The work has been intermeshed with ongoing NASA design and development studies to leverage the funds provided by the Center.
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. This research project addressed the following questions: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences?more » 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost?« less
A simulation model of hospital management based on cost accounting analysis according to disease.
Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki
2004-12-01
Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.
Development of the WTS-4 wind turbine design
NASA Astrophysics Data System (ADS)
Hasbrouck, T. M.; Divalentin, E.
Design features, developmental aspects, and financial projections for the WTS-4 4 MW wind turbine are presented. The WTS-4 is a horizontal axis, downwind, two-bladed, variable pitch machine. Start-up is at 7 m/s, rated power is reached at 15 m/s, and shut-down is set at 27 m/s, with all controls operating in a stand-alone mode by means of microprocessors. Each blade is 125 ft long, constructed of filament wound fiberglass reinforced epoxy, and attached at the root to a teetered steel alloy hub, which compensates for the shear caused by the tower shadow. Pitch is controlled by an electrohydraulic mechanism, and can be effected at a rate of 5 deg/s. Details of the nacelle components and costruction are provided, together with features of the system controller and design trade-offs. Cost comparisons with utility scale coal and oil baseload generation plants indicate that wind turbines will become cost competitive by 1985 and are favored thereafter.
Awareness of BIM adoption in Brunei
NASA Astrophysics Data System (ADS)
Rahman, Md Motiar
2017-09-01
Building Information Modelling (BIM) is getting increased attention day-by-day due to its many benefits, including clash detection, collaboration between contract parties, visualization future structure, optimized schedule and project control, waste control, design documentation, and harmonized facilities management. As such, many countries have already adopted BIM, and many other countries are exploring the potential of adopting it. However, it is still relatively new and unknown to some other countries like Brunei. This study was therefore undertaken to generate and/or gauge the awareness of Brunei construction industry participants, targeting adoption of BIM, through a structured questionnaire survey. Responses from 90 industry participants reveal that Brunei Construction industry is not well aware of BIM, lack the required technical knowledge and application in construction, and cost involvement. They are unsure about the potential benefits and barriers to implementing BIM. However, respondents are hopeful that BIM can bring the required changes in construction, willing to adopt BIM, expects cliental support with initial investment for its adoption, and believe that BIM is the future of construction project information management. On the whole, private sector was seen to be more aware on BIM than public sector. The study outcomes are expected to provide the policy makers a first-hand information on the industry awareness on BIM, which in turn help them for further exploration / examination and to design any action plan and guidelines for BIM adoption.
Fuel weight and removal costs in fuel-break construction
James L. Murphy
1966-01-01
Three major fuel types were sampled during fuel-break construction on the west side of the Sierra Nevada, California. Fuel weight per acre ranged from 12.2. to 420.6 tons per acre on average. Fuel-break construction removed 27.9 to 40.5 percent of teh total fuel; costs ranged from $141.29 to $148.38 per acre and $1.16 to $4.43 per ton.
1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.
1981-02-02
7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of
Prioritizing prevention opportunities in the Washington State construction industry, 2003-2007.
Schoonover, Todd; Bonauto, David; Silverstein, Barbara; Adams, Darrin; Clark, Randy
2010-06-01
This study compares construction industry groups in Washington State by injury severity and cost, and ranks industry groups according to potential for prevention. All Washington State workers' compensation compensable claims with date of injury between 2003 and 2007 were classified into North American Industrial Classification System (NAICS) industry groups. Claims were then aggregated by injury type and industry groups were ranked according to a prevention index (PI). The PI is the average of the rank orders of the claim count and the claim incidence rate. A lower PI indicates a higher need for prevention activities. The severity rate was calculated as the number of days of time loss per 10,000 full-time equivalents (FTEs). For all injury types, construction industry groups occupy 7 of the top 15 PI ranks in Washington State. The severity rate among construction industry groups was twice that for non-construction groups for all injury types. Foundation, structure, and building exterior contractors (NAICS 2381) ranked highest in prevention potential and severity among construction industry groups for most common injury types including falls from elevation, fall on same level, struck by/against, and musculo-skeletal disorders of the neck, back, and upper extremity (WMSDs). Median claim costs by injury type were generally higher among construction industry groups. The construction industry in Washington State has a high severity rate and potential for prevention. The methods used for characterizing these industry groups can be adapted for comparison within and between other industries and states. These data can be used by industry groups and employers to identify higher cost and higher severity injury types. Knowledge about the relative frequencies and costs associated with different injury types will help employers and construction industry associations make better informed decisions about where prevention efforts are most needed and may have the greatest impact. The results of this study can also be used by industry stakeholders to cooperatively focus on high cost and high severity injuries and explore best practices, interventions, and solutions as demonstrated by efforts to prevent musculoskeletal disorders in masonry (Entzel, Albers, & Welch, 2007). Initiating construction industry groups to focus on high cost and high severity injuries may also help prevent other types of injuries. (c) 2010 National Safety Council. Published by Elsevier Ltd. All rights reserved.
Optimal transfers between unstable periodic orbits using invariant manifolds
NASA Astrophysics Data System (ADS)
Davis, Kathryn E.; Anderson, Rodney L.; Scheeres, Daniel J.; Born, George H.
2011-03-01
This paper presents a method to construct optimal transfers between unstable periodic orbits of differing energies using invariant manifolds. The transfers constructed in this method asymptotically depart the initial orbit on a trajectory contained within the unstable manifold of the initial orbit and later, asymptotically arrive at the final orbit on a trajectory contained within the stable manifold of the final orbit. Primer vector theory is applied to a transfer to determine the optimal maneuvers required to create the bridging trajectory that connects the unstable and stable manifold trajectories. Transfers are constructed between unstable periodic orbits in the Sun-Earth, Earth-Moon, and Jupiter-Europa three-body systems. Multiple solutions are found between the same initial and final orbits, where certain solutions retrace interior portions of the trajectory. All transfers created satisfy the conditions for optimality. The costs of transfers constructed using manifolds are compared to the costs of transfers constructed without the use of manifolds. In all cases, the total cost of the transfer is significantly lower when invariant manifolds are used in the transfer construction. In many cases, the transfers that employ invariant manifolds are three times more efficient, in terms of fuel expenditure, than the transfer that do not. The decrease in transfer cost is accompanied by an increase in transfer time of flight.
The digital code driven autonomous synthesis of ibuprofen automated in a 3D-printer-based robot.
Kitson, Philip J; Glatzel, Stefan; Cronin, Leroy
2016-01-01
An automated synthesis robot was constructed by modifying an open source 3D printing platform. The resulting automated system was used to 3D print reaction vessels (reactionware) of differing internal volumes using polypropylene feedstock via a fused deposition modeling 3D printing approach and subsequently make use of these fabricated vessels to synthesize the nonsteroidal anti-inflammatory drug ibuprofen via a consecutive one-pot three-step approach. The synthesis of ibuprofen could be achieved on different scales simply by adjusting the parameters in the robot control software. The software for controlling the synthesis robot was written in the python programming language and hard-coded for the synthesis of ibuprofen by the method described, opening possibilities for the sharing of validated synthetic 'programs' which can run on similar low cost, user-constructed robotic platforms towards an 'open-source' regime in the area of chemical synthesis.
The digital code driven autonomous synthesis of ibuprofen automated in a 3D-printer-based robot
Kitson, Philip J; Glatzel, Stefan
2016-01-01
An automated synthesis robot was constructed by modifying an open source 3D printing platform. The resulting automated system was used to 3D print reaction vessels (reactionware) of differing internal volumes using polypropylene feedstock via a fused deposition modeling 3D printing approach and subsequently make use of these fabricated vessels to synthesize the nonsteroidal anti-inflammatory drug ibuprofen via a consecutive one-pot three-step approach. The synthesis of ibuprofen could be achieved on different scales simply by adjusting the parameters in the robot control software. The software for controlling the synthesis robot was written in the python programming language and hard-coded for the synthesis of ibuprofen by the method described, opening possibilities for the sharing of validated synthetic ‘programs’ which can run on similar low cost, user-constructed robotic platforms towards an ‘open-source’ regime in the area of chemical synthesis. PMID:28144350
Scheduling and control strategies for the departure problem in air traffic control
NASA Astrophysics Data System (ADS)
Bolender, Michael Alan
Two problems relating to the departure problem in air traffic control automation are examined. The first problem that is addressed is the scheduling of aircraft for departure. The departure operations at a major US hub airport are analyzed, and a discrete event simulation of the departure operations is constructed. Specifically, the case where there is a single departure runway is considered. The runway is fed by two queues of aircraft. Each queue, in turn, is fed by a single taxiway. Two salient areas regarding scheduling are addressed. The first is the construction of optimal departure sequences for the aircraft that are queued. Several greedy search algorithms are designed to minimize the total time to depart a set of queued aircraft. Each algorithm has a different set of heuristic rules to resolve situations within the search space whenever two branches of the search tree with equal edge costs are encountered. These algorithms are then compared and contrasted with a genetic search algorithm in order to assess the performance of the heuristics. This is done in the context of a static departure problem where the length of the departure queue is fixed. A greedy algorithm which deepens the search whenever two branches of the search tree with non-unique costs are encountered is shown to outperform the other heuristic algorithms. This search strategy is then implemented in the discrete event simulation. A baseline performance level is established, and a sensitivity analysis is performed by implementing changes in traffic mix, routing, and miles-in-trail restrictions for comparison. It is concluded that to minimize the average time spent in the queue for different traffic conditions, a queue assignment algorithm is needed to maintain an even balance of aircraft in the queues. A necessary consideration is to base queue assignment upon traffic management restrictions such as miles-in-trail constraints. The second problem addresses the technical challenges associated with merging departure aircraft onto their filed routes in a congested airspace environment. Conflicts between departures and en route aircraft within the Center airspace are analyzed. Speed control, holding the aircraft; at an intermediate altitude, re-routing, and vectoring are posed as possible deconfliction maneuvers. A cost assessment of these merge strategies, which are based upon 4D fight management and conflict detection and resolution principles, is given. Several merge conflicts are studied and a cost for each resolution is computed. It is shown that vectoring tends to be the most expensive resolution technique. Altitude hold is simple, costs less than vectoring, but may require a long time for the aircraft to achieve separation. Re-routing is the simplest, and provides the most cost benefit since the aircraft flies a shorter distance than if it had followed its filed route. Speed control is shown to be ineffective as a means of increasing separation, but is effective for maintaining separation between aircraft. In addition, the affects of uncertainties on the cost are assessed. The analysis shows that cost is invariant with the decision time.
Performance and cost evaluation of constructed wetland for domestic waste water treatment.
Deeptha, V T; Sudarsan, J S; Baskar, G
2015-09-01
Root zone treatment through constructed wetlands is an engineered method of purifying wastewater. The aim of the present research was to study the potential of wetland plants Phragmites and Typha in treatment of wastewater and to compare the cost of constructed wetlands with that of conventional treatment systems. A pilot wetland unit of size 2x1x0.9 m was constructed in the campus. 3x3 rows of plants were transplanted into the pilot unit and subjected to wastewater from the hostels and other campus buildings. The raw wastewater and treated wastewater were collected periodically and tested for Total nitrogen (TN),Total Phosphorous (TP), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD). It was observed that this pilot unit reduced the concentrations of TN, TP, BOD and COD by 76, 73, 83 and 86%, respectively, on an average. Root zone system achieved standards for tertiary treatment with low operating costs, low maintenance costs, enhance the landscape, provide a natural habitat for birds, and did not emit any odour.
Recycling of construction debris as aggregate in the Mid-Atlantic Region, USA
Robinson, G.R.; Menzie, W.D.; Hyun, H.
2004-01-01
Reclaimed asphalt pavement (RAP) and portland cement concrete (RPCC) are abundant and available substitutes for natural aggregate in many areas. This paper presents an overview of factors that affect recycled aggregate cost, availability, and engineering performance, and the results of a survey of business practices in the Mid-Atlantic region. For RAP, processing costs are less than those for virgin natural aggregate. Use of efficient asphalt pavement stripping technology, on-site reclamation, and linked two-way transport of asphalt debris and processed asphalt paving mix between asphalt mix plants and paving sites has led to extensive recycling of asphalt pavement in the Mid-Atlantic region of the US. Most of the sites that recycle asphalt pavement (RAP) are located in or near urban areas close to important transportation corridors. RPCC is a viable aggregate source in urban settings where unit costs for processed aggregate from RPCC and natural aggregate are comparable. Disposal fees charged at RPCC recycling sites help defray processing costs and the significantly lower tipping fees at recycling sites versus landfill disposal sites encourage recycling of construction debris as aggregate. Construction contractors and construction debris recycling centers, many of which have the ability to crush and process concrete debris at the job site, produce most RPCC. Production of RPCC aggregate from construction debris that is processed on site using portable equipment moved to the construction site eliminates transportation costs for aggregate and provides an economic incentive for RPCC use. Processing costs, quality and performance issues, and lack of large quantities where needed limit RPCC use. Most RPCC suppliers in the Mid-Atlantic area are located in counties with population densities greater than 400 people/km2 (1036 people/mile2) and that have high unit-value costs and limited local availability of natural aggregate. ?? 2004 Published by Elsevier B.V.
Sansalone, John; Raje, Saurabh; Kertesz, Ruben; Maccarone, Kerrilynn; Seltzer, Karl; Siminari, Michele; Simms, Peter; Wood, Brandon
2013-12-01
The built environs alter hydrology and water resource chemistry. Florida is subject to nutrient criteria and is promulgating "no-net-load-increase" criteria for runoff and constituents (nutrients and particulate matter, PM). With such criteria, green infrastructure, hydrologic restoration, indirect reuse and source control are potential design solutions. The study simulates runoff and constituent load control through urban source area re-design to provide long-term "no-net-load-increases". A long-term continuous simulation of pre- and post-development response for an existing surface parking facility is quantified. Retrofits include a biofiltration area reactor (BAR) for hydrologic and denitrification control. A linear infiltration reactor (LIR) of cementitious permeable pavement (CPP) provides infiltration, adsorption and filtration. Pavement cleaning provided source control. Simulation of climate and source area data indicates re-design achieves "no-net-load-increases" at lower costs compared to standard construction. The retrofit system yields lower cost per nutrient load treated compared to Best Management Practices (BMPs). Copyright © 2013 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Tarmizi, H. B.; Daulay, M.; Muda, I.
2017-03-01
This study aims to test the aggregation of the economic growth of North Sumatra and the influence of the Tax on Acquisition of Land and Building to the Construction Cost Index in North Sumatra. This type of research is explanatory survey with quantitative methods. The population and the sample district in North Sumatra with the observation time series and cross sectional. The analysis tool used is multiple regression. The results showed that there was economic growth aggregation of North Sumatra and the influence of the Tax on Acquisition of Land and Building affect the Construction Cost Index.
Study and evaluation of ferro-cement for use in wind tunnel construction
NASA Technical Reports Server (NTRS)
Larsen, H. J., Jr. (Compiler)
1972-01-01
The structural suitability and cost effectiveness of ferro-cement for large subsonic wind tunnel structures is investigated. This investigation was carried out in the following four main categories: (1) a state-of-the-art survey into the uses, properties, and costs of ferro-cement; (2) an evaluation of those ferro-cement properties critical to construction of large, subsonic wind tunnels, which have not been adequately established to date; (3) a laboratory testing program to determine preliminary values for those properties; and (4) a study to establish cost factors for ferro-cement as related to a preliminary construction scheme for a nacelle and shroud unit.
The Finnish experience to save asthma costs by improving care in 1987-2013.
Haahtela, Tari; Herse, Fredrik; Karjalainen, Jussi; Klaukka, Timo; Linna, Miika; Leskelä, Riikka-Leena; Selroos, Olof; Reissell, Eeva
2017-02-01
The Finnish National Asthma Program 1994-2004 markedly improved asthma care in the 1990s. We evaluated the changes in costs during 26 years from 1987 to 2013. Direct and indirect costs were calculated by using data from national registries. Costs from both the societal and patient perspectives were included. The costs were based on patients with persistent, physician-diagnosed asthma verified by lung function measurements. We constructed minimum and maximum scenarios to assess the effect of improved asthma care on total costs. The number of patients with persistent asthma in the national drug reimbursement register increased from 83,000 to 247,583. Improved asthma control reduced health care use and disability, resulting in major cost savings. Despite a 3-fold increase in patients, the total costs decreased by 14%, from €222 million to €191 million. Costs for medication and primary care visits increased, but overall annual costs per patient decreased by 72%, from €2656 to €749. The theoretical total cost savings for 2013, comparing actual with predicted costs, were between €120 and €475 million, depending on the scenario used. The Finnish Asthma Program resulted in significant cost savings at both the societal and patient levels during a 26-year period. Copyright © 2016 American Academy of Allergy, Asthma & Immunology. Published by Elsevier Inc. All rights reserved.
Rocke, Tonie E.; Kingstad-Bakke, Brock; Berlier, Willy; Osorio, Jorge E.
2014-01-01
In previous studies, we demonstrated in mice and prairie dogs that simultaneous administration of two recombinant raccoon poxviruses (rRCN) expressing Yersinia pestis antigens (F1 and V307—a truncated version of the V protein) provided superior protection against plague challenge compared to individual single antigen constructs. To reduce costs of vaccine production and facilitate implementation of a sylvatic plague vaccine (SPV) control program for prairie dogs, a dual antigen construct is more desirable. Here we report the construction and characterization of a novel RCN-vectored vaccine that simultaneously expresses both F1 and V307 antigens. This dual antigen vaccine provided similar levels of protection against plague in both mice and prairie dogs as compared to simultaneous administration of the two single antigen constructs and was also shown to protect mice against an F1 negative strain of Y. pestis. The equivalent safety, immunogenicity and efficacy profile of the dual RCN-F1/V307 construct warrants further evaluation in field efficacy studies in sylvatic plague endemic areas. PMID:26344891
Rocke, Tonie E.; Kingstad-Bakke, B; Berlier, W; Osorio, J.E.
2014-01-01
In previous studies, we demonstrated in mice and prairie dogs that simultaneous administration of two recombinant raccoon poxviruses (rRCN) expressing Yersinia pestis antigens (F1 and V307-a truncated version of the V protein) provided superior protection against plague challenge compared to individual single antigen constructs. To reduce costs of vaccine production and facilitate implementation of a sylvatic plague vaccine (SPV) control program for prairie dogs, a dual antigen construct is more desirable. Here we report the construction and characterization of a novel RCN-vectored vaccine that simultaneously expresses both F1 and V307 antigens. This dual antigen vaccine provided similar levels of protection against plague in both mice and prairie dogs as compared to simultaneous administration of the two single antigen constructs and was also shown to protect mice against an F1 negative strain of Y. pestis.. The equivalent safety, immunogenicity and efficacy profile of the dual RCN-F1/V307 construct warrants further evaluation in field efficacy studies in sylvatic plague endemic areas.
NASA Astrophysics Data System (ADS)
Li, Yi; Ye, Quanliang; Liu, An; Meng, Fangang; Zhang, Wenlong; Xiong, Wei; Wang, Peifang; Wang, Chao
2017-07-01
Urban rainwater management need to achieve an optimal compromise among water resource augmentation, water loggings alleviation, economic investment and pollutants reduction. Rainwater harvesting (RWH) systems, such as green rooftops, porous pavements, and green lands, have been successfully implemented as viable approaches to alleviate water-logging disasters and water scarcity problems caused by rapid urbanization. However, there is limited guidance to determine the construction areas of RWH systems, especially for stormwater runoff control due to increasing extreme precipitation. This study firstly developed a multi-objective model to optimize the construction areas of green rooftops, porous pavements and green lands, considering the trade-offs among 24 h-interval RWH volume, stormwater runoff volume control ratio (R), economic cost, and rainfall runoff pollutant reduction. Pareto fronts of RWH system areas for 31 provinces of China were obtained through nondominated sorting genetic algorithm. On the national level, the control strategies for the construction rate (the ratio between the area of single RWH system and the total areas of RWH systems) of green rooftops (ηGR), porous pavements (ηPP) and green lands (ηGL) were 12%, 26% and 62%, and the corresponding RWH volume and total suspended solids reduction was 14.84 billion m3 and 228.19 kilotons, respectively. Optimal ηGR , ηPP and ηGL in different regions varied from 1 to 33%, 6 to 54%, and 30 to 89%, respectively. Particularly, green lands were the most important RWH system in 25 provinces with ηGL more than 50%, ηGR mainly less than 15%, and ηPP mainly between 10 and 30%. Results also indicated whether considering the objective MaxR made a non-significant difference for RWH system areas whereas exerted a great influence on the result of stormwater runoff control. Maximum daily rainfall under control increased, exceeding 200% after the construction of the optimal RWH system compared with that before construction. Optimal RWH system areas presented a general picture for urban development policy makers in China.
13 CFR 120.884 - Ineligible costs for 504 loans.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Construction equipment (except for heavy duty construction equipment integral to a business' operations and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Ineligible costs for 504 loans. 120.884 Section 120.884 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Eric; Withers, Chuck; McIlvaine, Janet
The well-sealed, highly insulated building enclosures constructed by today's home building industry coupled with efficient lighting and appliances are achieving significantly reduced heating and cooling loads. These low-load homes can present a challenge when selecting appropriate space-conditioning equipment. Conventional, fixed-capacity heating and cooling equipment is often oversized for small homes, causing increased first costs and operating costs. Even if fixed-capacity equipment can be properly specified for peak loads, it remains oversized for use during much of the year. During these part-load cooling hours, oversized equipment meets the target dry-bulb temperatures very quickly, often without sufficient opportunity for moisture control. Themore » problem becomes more acute for high-performance houses in humid climates when meeting ASHRAE Standard 62.2 recommendations for wholehouse mechanical ventilation.« less
Health-Mining: a Disease Management Support Service based on Data Mining and Rule Extraction.
Bei, Andrea; De Luca, Stefano; Ruscitti, Giancarlo; Salamon, Diego
2005-01-01
The disease management is the collection of the processes aimed to control the health care and improving the quality at same time reducing the overall cost of the procedures. Our system, Health-Mining, is a Decision Support System with the objective of controlling the adequacy of hospitalization and therapies, determining the effective use of standard guidelines and eventually identifying better ones emerged from the medical practice (Evidence Based Medicine). In realizing the system, we have the aim of creation of a path to admissions- appropriateness criteria construction, valid at an international level. A main goal of the project is rule extraction and the identification of the rules adequate in term of efficacy, quality and cost reduction, especially in the view of fast changing technologies and medicines. We tested Health-Mining in a real test case for an Italian Region, Regione Veneto, on the installation of pacemaker and ICD.
Economic evaluation of nebulized magnesium sulphate in acute severe asthma in children.
Petrou, Stavros; Boland, Angela; Khan, Kamran; Powell, Colin; Kolamunnage-Dona, Ruwanthi; Lowe, John; Doull, Iolo; Hood, Kerry; Williamson, Paula
2014-10-01
The aim of this study was to estimate the cost-effectiveness of nebulized magnesium sulphate (MgSO4) in acute asthma in children from the perspective of the UK National Health Service and personal social services. An economic evaluation was conducted based on evidence from a randomized placebo controlled multi-center trial of nebulized MgSO4 in severe acute asthma in children. Participants comprised 508 children aged 2-16 years presenting to an emergency department or a children's assessment unit with severe acute asthma across thirty hospitals in the United Kingdom. Children were randomly allocated to receive nebulized salbutamol and ipratropium bromide mixed with either 2.5 ml of isotonic MgSO4 or 2.5 ml of isotonic saline on three occasions at 20-min intervals. Cost-effectiveness outcomes were constructed around the Yung Asthma Severity Score (ASS) after 60 min of treatment; whilst cost-utility outcomes were constructed around the quality-adjusted life-year (QALY) metric. The nonparametric bootstrap method was used to present cost-effectiveness acceptability curves at alternative cost-effectiveness thresholds for either: (i) a unit reduction in ASS; or (ii) an additional QALY. MgSO4 had a 75.1 percent probability of being cost-effective at a GBP 1,000 (EUR 1,148) per unit decrement in ASS threshold, an 88.0 percent probability of being more effective (in terms of reducing the ASS) and a 36.6 percent probability of being less costly. MgSO4 also had a 67.6 percent probability of being cost-effective at a GBP 20,000 (EUR 22,957) per QALY gained threshold, an 8.5 percent probability of being more effective (in terms of generating increased QALYs) and a 69.1 percent probability of being less costly. Sensitivity analyses showed that the results of the economic evaluation were particularly sensitive to the methods used for QALY estimation. The probability of cost-effectiveness of nebulized isotonic MgSO4, given as an adjuvant to standard treatment of severe acute asthma in children, is less than 70 percent across accepted cost-effectiveness thresholds for an additional QALY.
NASA Astrophysics Data System (ADS)
Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris
2018-05-01
Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.
Cognitive Constraints and Island Effects
Hofmeister, Philip; Sag, Ivan A.
2012-01-01
Competence-based theories of island effects play a central role in generative grammar, yet the graded nature of many syntactic islands has never been properly accounted for. Categorical syntactic accounts of island effects have persisted in spite of a wealth of data suggesting that island effects are not categorical in nature and that non-structural manipulations that leave island structures intact can radically alter judgments of island violations. We argue here, building on work by Deane, Kluender, and others, that processing factors have the potential to account for this otherwise unexplained variation in acceptability judgments. We report the results of self-paced reading experiments and controlled acceptability studies which explore the relationship between processing costs and judgments of acceptability. In each of the three self-paced reading studies, the data indicate that the processing cost of different types of island violations can be significantly reduced to a degree comparable to that of non-island filler-gap constructions by manipulating a single non-structural factor. Moreover, this reduction in processing cost is accompanied by significant improvements in acceptability. This evidence favors the hypothesis that island-violating constructions involve numerous processing pressures that aggregate to drive processing difficulty above a threshold so that a perception of unacceptability ensues. We examine the implications of these findings for the grammar of filler-gap dependencies.* PMID:22661792
Sail Plan Configuration Optimization for a Modern Clipper Ship
NASA Astrophysics Data System (ADS)
Gerritsen, Margot; Doyle, Tyler; Iaccarino, Gianluca; Moin, Parviz
2002-11-01
We investigate the use of gradient-based and evolutionary algorithms for sail shape optimization. We present preliminary results for the optimization of sheeting angles for the rig of the future three-masted clipper yacht Maltese Falcon. This yacht will be equipped with square-rigged masts made up of yards of circular arc cross sections. This design is especially attractive for megayachts because it provides a large sail area while maintaining aerodynamic and structural efficiency. The rig remains almost rigid in a large range of wind conditions and therefore a simple geometrical model can be constructed without accounting for the true flying shape. The sheeting angle optimization studies are performed using both gradient-based cost function minimization and evolutionary algorithms. The fluid flow is modeled by the Reynolds-averaged Navier-Stokes equations with the Spallart-Allmaras turbulence model. Unstructured non-conforming grids are used to increase robustness and computational efficiency. The optimization process is automated by integrating the system components (geometry construction, grid generation, flow solver, force calculator, optimization). We compare the optimization results to those done previously by user-controlled parametric studies using simple cost functions and user intuition. We also investigate the effectiveness of various cost functions in the optimization (driving force maximization, ratio of driving force to heeling force maximization).
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
NASA Technical Reports Server (NTRS)
Upton, H. W.; Boen, G. E.; Moore, J.
1982-01-01
Results are presented of a survey conducted of active helicopter operators to determine the extent to which they wish to operate in IMC conditions, the visibility limits under which they would operate, the revenue benefits to be gained, and the percent of aircraft cost they would pay for such increased capability. Candidate systems were examined for capability to meet the requirements of a mission model constructed to represent the modes of flight normally encountered in low visibility conditions. Recommendations are made for development of high resolution radar, simulation of the control display system for steep approaches, and for development of an obstacle sensing system for detecting wires. A cost feasibility analysis is included.
Diagnosis Related Groups as a Casemix/Management Tool for Hospice Patients
Johnson-Hürzeler, R.; Leary, Robert J.; Hill, Claire L.
1983-01-01
to control the costs of care, and to remain prepared for changes in reimbursement methodologies, health care organizations are beginning to analyze their casemix and their costs per case of providing care. Increasing importance is thus assigned to the search for valid casemix measures and to the construction of information systems which will support casemix investigations. After two years of information systems development, The Connecticut Hospice has begun its search for casemix measures that are applicable to the care of the dying. In this paper, we present our findings on the application of one casemix measure - the DRG - in the specialized area of nonsurgical care of the terminally ill.
Big Creek Flood Control Project, Cleveland, Ohio. Phase II. General Design Memorandum.
1979-08-01
enviromental measure to -minii polluted leachate, if say, from flowing down the embashment. 1. Comnt 12(a). The freboard on the chute will be revised...cost ratio); (3) operational dependability; and (4) socio -environmental effects, including external damage effects. Each of these alternative plans is...schedule for the utility relocations will not be in conflict with the construction schedule for the major components of the project outlined above. 112
Cost Analysis of Leed Certified United States Navy Buildings
2011-08-03
be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding
2014-11-01
thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost...cap, by postponing installation of some systems until after ship delivery, and deferring an estimated $200 million - $250 million in previously
Software Estimates Costs of Testing Rocket Engines
NASA Technical Reports Server (NTRS)
Smith, C. L.
2003-01-01
Simulation-Based Cost Model (SiCM), a discrete event simulation developed in Extend , simulates pertinent aspects of the testing of rocket propulsion test articles for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.
Value for money in drug treatment: economic evaluation of prison methadone.
Warren, Emma; Viney, Rosalie; Shearer, James; Shanahan, Marian; Wodak, Alex; Dolan, Kate
2006-09-15
Although methadone maintenance treatment in community settings is known to reduce heroin use, HIV infection and mortality among injecting drug users (IDU), little is known about prison methadone programs. One reason for this is the complexity of undertaking evaluations in the prison setting. This paper estimates the cost-effectiveness of the New South Wales (NSW) prison methadone program. Information from the NSW prison methadone program was used to construct a model of the costs of the program. The information was combined with data from a randomised controlled trial of provision of prison methadone in NSW. The total program cost was estimated from the perspective of the treatment provider/funder. The cost per heroin free day, compared with no prison methadone, was estimated. Assumptions regarding resource use were tested through sensitivity analysis. The annual cost of providing prison methadone in NSW was estimated to be 2.9 million Australian dollars (or 3,234 Australian dollars per inmate per year). The incremental cost effectiveness ratio is 38 Australian dollars per additional heroin free day. From a treatment perspective, prison methadone is no more costly than community methadone, and provides benefits in terms of reduced heroin use in prisons, with associated reduction in morbidity and mortality.
NASA Astrophysics Data System (ADS)
Yanchun, Wan; Qiucen, Chen
2017-11-01
Purchasing is an important part of export e-commerce of B2C, which plays an important role on risk and cost control in supply management. From the perspective of risk control, the paper construct a CVaR model for portfolio purchase. We select a heavy sales mobile power equipment from a typical B2C e-commerce export retailer as study sample. This study optimizes the purchasing strategy of this type of mobile power equipment. The research has some reference for similar enterprises in purchasing portfolio decision.
75 FR 1403 - Notice of Proposed Information Collection for 1004-0102
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... to pay private landowners for the use and/or maintenance of their roads. These fees represent the BLM's share of road construction and maintenance costs under reciprocal right-of-way agreements between... contract, and to amortize road construction and maintenance costs among several road users. Frequency of...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
2012-01-01
Background The prevalence of both overweight and musculoskeletal disorders (MSD) in the construction industry is high. Many interventions in the occupational setting aim at the prevention and reduction of these health problems, but it is still unclear how these programmes should be designed. To determine the effectiveness of interventions on these health outcomes randomised controlled trials (RCTs) are needed. The aim of this study is to systematically develop a tailored intervention for prevention and reduction of overweight and MSD among construction workers and to describe the evaluation study regarding its (cost-)effectiveness. Methods/Design The Intervention Mapping (IM) protocol was applied to develop and implement a tailored programme aimed at the prevention and reduction of overweight and MSD. The (cost-) effectiveness of the intervention programme will be evaluated using an RCT. Furthermore, a process evaluation will be conducted. The research population will consist of blue collar workers of a large construction company in the Netherlands. Intervention The intervention programme will be aimed at improving (vigorous) physical activity levels and healthy dietary behaviour and will consist of tailored information, face-to-face and telephone counselling, training instruction (a fitness "card" to be used for exercises), and materials designed for the intervention (overview of the company health promoting facilities, waist circumference measuring tape, pedometer, BMI card, calorie guide, recipes, and knowledge test). Main study parameters/endpoints The intervention effect on body weight and waist circumference (primary outcome measures), as well as on lifestyle behaviour, MSD, fitness, CVD risk indicators, and work-related outcomes (i.e. productivity, sick leave) (secondary outcome measures) will be assessed. Discussion The development of the VIP in construction intervention led to a health programme tailored to the needs of construction workers. This programme, if proven effective, can be directly implemented. Trial registration Netherlands Trial Register (NTR): NTR2095 PMID:22289212
Troyer, Jennifer L; McAuley, William J; McCutcheon, Megan E
2010-12-01
Many older adults experience hyperlipidemia and hypertension, but there is little information about whether medical nutrition therapy (MNT) or therapeutic meals have independent or joint beneficial effects on older adults with these diagnoses. To assess the cost-effectiveness of MNT and therapeutic meals for older adults with hyperlipidemia and/or hypertension. A 1-year prospective four-arm controlled randomized community-based clinical trial. Participants were people ages 60 years or older residing in community settings who were medically diagnosed with either hypertension or hyperlipidemia. They were recruited through a number of venues beginning in May 2003. The 321 eligible individuals were assigned to one of four arms: (a) a literature control group, (b) a therapeutic meal group that received seven diagnosis-appropriate therapeutic meals a week, (c) an MNT group, and (d) an MNT-plus-therapeutic meal group. The outcome measure was quality-adjusted life-years (QALYs). Costs included both intervention and medical costs. Estimations of separate models of costs and QALYs facilitated the construction of incremental cost-effectiveness ratios. Net benefit analysis produced the probability that each intervention was cost-effective given different values for society's willingness to pay for a QALY. Therapeutic meals are cost-effective. Using the net benefit approach and a willingness to pay of $109,000 per QALY, the probability that the therapeutic meal delivery program is cost-effective is 95% and for MNT the probability is 90%. However, the combination of MNT and therapeutic meals did not have an independent significant effect on QALYs. Results inform the debate about extending Medicare funding for MNT to individuals with hypertension and hyperlipidemia. Future research should include more individuals who are not currently receiving medications for these diseases. Copyright © 2010 American Dietetic Association. Published by Elsevier Inc. All rights reserved.
López, M Fernanda; Mingot, María Eva; Valcárcel, David; Vicente García, Vicente; Perrin, Allison; Campos Tapias, Ignasi
2015-05-08
Romiplostim, a thrombopoietin-receptor agonist, is approved for second-line use in idiopathic thrombocytopenic purpura (ITP) patients where surgery is contraindicated. Anti-CD20 rituximab, an immunosuppressant, is currently used off-label. This analysis compared the cost per responder for romiplostim versus rituximab in Spain. A decision analytic model was constructed to estimate the 6-month cost per responding patient (achieving a platelet count≥50×10(9)/l) according to the most robust published data. A systematic literature review was performed to extract response rates from phase 3 randomized controlled trials. Romiplostim patients received weekly injections; rituximab patients received 4 weekly intravenous infusions. Medical resource costs were obtained from Spanish reimbursement lists. Treatment non-responders incurred bleeding-related event (BRE) management costs as reported in clinical trials. Medical resource utilization and clinical practice were based on Spanish treatment guidelines and validated by local clinical experts. The literature review identified phase 3 romiplostim trials with a response rate of 83%. Due to a lack of phase 3 controlled rituximab trials, a systematic review of studies was selected as the best source, reporting a response rate of 62.5%. The mean cost per patient for romiplostim was €16,289 and €13,459 for rituximab. Rituximab resulted in a 10% higher cost per responder (€21,535 versus €19,625 for romiplostim). Romiplostim use reduced drug administration, intravenous immunoglobulin, and bleeding-related costs compared to rituximab. Due to its high level of efficacy leading to lower BRE costs, romiplostim represents an efficient use of resources for adult ITP patients in the Spanish Healthcare System. Copyright © 2013 Elsevier España, S.L.U. All rights reserved.
Title I preliminary engineering for: A. S. E. F. solid waste to methane gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-01-01
An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less
Bi-Objective Optimal Control Modification Adaptive Control for Systems with Input Uncertainty
NASA Technical Reports Server (NTRS)
Nguyen, Nhan T.
2012-01-01
This paper presents a new model-reference adaptive control method based on a bi-objective optimal control formulation for systems with input uncertainty. A parallel predictor model is constructed to relate the predictor error to the estimation error of the control effectiveness matrix. In this work, we develop an optimal control modification adaptive control approach that seeks to minimize a bi-objective linear quadratic cost function of both the tracking error norm and predictor error norm simultaneously. The resulting adaptive laws for the parametric uncertainty and control effectiveness uncertainty are dependent on both the tracking error and predictor error, while the adaptive laws for the feedback gain and command feedforward gain are only dependent on the tracking error. The optimal control modification term provides robustness to the adaptive laws naturally from the optimal control framework. Simulations demonstrate the effectiveness of the proposed adaptive control approach.
The Temperature Fuzzy Control System of Barleythe Malt Drying Based on Microcontroller
NASA Astrophysics Data System (ADS)
Gao, Xiaoyang; Bi, Yang; Zhang, Lili; Chen, Jingjing; Yun, Jianmin
The control strategy of temperature and humidity in the beer barley malt drying chamber based on fuzzy logic control was implemented.Expounded in this paper was the selection of parameters for the structure of the regulatory device, as well as the essential design from control rules based on the existing experience. A temperature fuzzy controller was thus constructed using relevantfuzzy logic, and humidity control was achieved by relay, ensured the situation of the humidity to control the temperature. The temperature's fuzzy control and the humidity real-time control were all processed by single chip microcomputer with assembly program. The experimental results showed that the temperature control performance of this fuzzy regulatory system,especially in the ways of working stability and responding speed and so on,was better than normal used PID control. The cost of real-time system was inquite competitive position. It was demonstrated that the system have a promising prospect of extensive application.
Benes, Jan; Zatloukal, Jan; Simanova, Alena; Chytra, Ivan; Kasal, Eduard
2014-01-01
Perioperative goal directed therapy (GDT) can substantially improve the outcomes of high risk surgical patients as shown by many clinical studies. However, the approach needs initial investment and can increase the already very high staff workload. These economic imperatives may be at least partly responsible for weak adherence to the GDT concept. A few models are available for the evaluation of GDT cost-effectiveness, but studies of real economic data based on a recent clinical trial are lacking. In order to address this we have performed a retrospective analysis of the data from the "Intraoperative fluid optimization using stroke volume variation in high risk surgical patients" trial (ISRCTN95085011). The health-care payers perspective was used in order to evaluate the perioperative hemodynamic optimization costs. Hospital invoices from all patients included in the trial were extracted. A direct comparison between the study (GDT, N = 60) and control (N = 60) groups was performed. A cost tree was constructed and major cost drivers evaluated. The trial showed a significant improvement in clinical outcomes for GDT treated patients. The mean cost per patient were lower in the GDT group 2877 ± 2336€ vs. 3371 ± 3238€ in controls, but without reaching a statistical significance (p = 0.596). The mean cost of all items except for intraoperative monitoring and infusions were lower for GDT than control but due to the high variability they all failed to reach statistical significance. Those costs associated with clinical care (68 ± 177€ vs. 212 ± 593€; p = 0.023) and ward stay costs (213 ± 108€ vs. 349 ± 467€; p = 0.082) were the most important differences in favour of the GDT group. Intraoperative fluid optimization with the use of stroke volume variation and Vigileo/FloTrac system showed not only a substantial improvement of morbidity, but was associated with an economic benefit. The cost-savings observed in the overall costs of postoperative care trend to offset the investment needed to run the GDT strategy and intraoperative monitoring. ISRCTN95085011.
An ethical framework for pharmacy management: balancing autonomy and other principles.
Glassman, Peter A; Schneider, Paul L; Good, Chester B
2014-04-01
Decisions to control pharmaceutical costs can cause conflicts as to what medications are covered. Such conflicts have ethical implications, however implicit, and given this fact, an ethical framework can help address them. In the following commentary, we discuss the more traditional, individual-level ethical considerations likely familiar to most clinicians. We, then, discuss population-level ethical constructs that clinicians may not as readily embrace. We also present a hypothetical cancer-care case to illustrate how imbalances in ethical foci between individual- and population-level constructs may lead to conflicts among health care actors and promote shifts in pharmaceutical decision making away from providers and toward payers, paradoxically reducing provider autonomy and hence patient autonomy. Finally, we propose a more comprehensive ethical framework to help converge individual, payer, and societal interests when making pharmaceutical use decisions. Pharmacists play a crucial role as pharmacy benefits managers and should be familiar with individual- and population-based ethical constructs.
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Space Construction System Analysis. Part 2: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
A detailed, end-to-end analysis of the activities, techniques, equipment and Shuttle provisions required to construct a reference project system is described. Included are: platform definition; construction analysis; cost and programmatics; and space construction experiments concepts.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Construction Management: Building Schools Faster in the International Marketplace
ERIC Educational Resources Information Center
Scarano, Joseph J.
1976-01-01
Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)
Assessing the cost of a cardiology residency program with a cost construction model.
Franzini, L; Chen, S C; McGhie, A I; Low, M D
1999-09-01
Although the total costs of graduate medical education are difficult to quantify, this information is of great importance in planning over the next decade. A cost construction model was used to quantify the costs of teaching faculty, cardiology fellows' salaries and benefits, overhead (physical plant, equipment, and support staff), and other costs associated with the cardiology residency program at the University of Texas-Houston during the 1996 to 1997 academic year. Surveys of cardiology faculty and fellows, checked by the program director, were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning cardiology fellows' productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The instructional cost of training (cost of didactic, direct clinical supervision, preparation for teaching, and teaching-related administration, plus the support of the teaching program) was estimated at $73,939 per cardiology fellow per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by cardiology fellows, $100,937 per cardiology fellow per year. Sensitivity analysis, with different assumptions on cardiology fellows' productivity and replacement costs, varied the cost estimates but generally represented the cardiology residency program as an asset. Cost construction models can be used as a tool to estimate variations in resource requirements resulting from changes in curriculum or educators' costs. In this residency, the value of the teaching and clinical services provided by cardiology fellows exceeded the cost of the resources used in the educational program.
NASA Astrophysics Data System (ADS)
Lilliestam, Johan; Labordena, Mercè; Patt, Anthony; Pfenninger, Stefan
2017-07-01
Concentrating solar power (CSP) capacity has expanded slower than other renewable technologies and its costs are still high. Until now, there have been too few CSP projects to derive robust conclusions about its cost development. Here we present an empirical study of the cost development of all operating CSP stations and those under construction, examining the roles of capacity growth, industry continuity, and policy support design. We identify distinct CSP expansion phases, each characterized by different cost pressure in the policy regime and different industry continuity. In 2008-2011, with low cost pressure and following industry discontinuity, costs increased. In the current phase, with high cost pressure and continuous industry development, costs decreased rapidly, with learning rates exceeding 20%. Data for projects under construction suggest that this trend is continuing and accelerating. If support policies and industrial structure are sustained, we see no near-term factors that would hinder further cost decreases.
Bérard, A; Bréchat, P-H; Rymer, R; Londsdorfer, J
2009-02-01
According to the framework legislation promulgated as part of the reform of finance laws in France, quality is a mandatory feature of all governmental actions. In this context, this work was conducted to assess the construction cost of a national health program designed to promote physical and sports activities and prevent doping behaviors. This program was considered to have the characteristic features of a successful governmental health intervention. Four cost categories were evaluated: cost of the activity itself, transportation costs, communication costs and promotion costs. It was found that the program costs for 2002-2007 were 100,000 euro, with 15% of the costs in the communication category. Economic elements could be associated with factors of successful health service interventions in order to help decision makers responsible for the public interest and the consistency of public health actions.
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...
Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soli Khericha; Edwin Harvego; John Svoboda
2012-01-01
The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less
A macro-micro robot for precise force applications
NASA Technical Reports Server (NTRS)
Marzwell, Neville I.; Wang, Yulun
1993-01-01
This paper describes an 8 degree-of-freedom macro-micro robot capable of performing tasks which require accurate force control. Applications such as polishing, finishing, grinding, deburring, and cleaning are a few examples of tasks which need this capability. Currently these tasks are either performed manually or with dedicated machinery because of the lack of a flexible and cost effective tool, such as a programmable force-controlled robot. The basic design and control of the macro-micro robot is described in this paper. A modular high-performance multiprocessor control system was designed to provide sufficient compute power for executing advanced control methods. An 8 degree of freedom macro-micro mechanism was constructed to enable accurate tip forces. Control algorithms based on the impedance control method were derived, coded, and load balanced for maximum execution speed on the multiprocessor system.
Cost effectiveness of a community-based crisis intervention program for people bereaved by suicide.
Comans, Tracy; Visser, Victoria; Scuffham, Paul
2013-01-01
Postvention services aim to ameliorate distress and reduce future incidences of suicide. The StandBy Response Service is one such service operating in Australia for those bereaved through suicide. Few previous studies have reported estimates or evaluations of the economic impact and outcomes associated with the implementation of bereavement/grief interventions. To estimate the cost-effectiveness of a postvention service from a societal perspective. A Markov model was constructed to estimate the health outcomes, quality-adjusted life years, and associated costs such as medical costs and time off work. Data were obtained from a prospective cross-sectional study comparing previous clients of the StandBy service with a control group of people bereaved by suicide who had not had contact with StandBy. Costs and outcomes were measured at 1 year after suicide bereavement and an incremental cost-effectiveness ratio was calculated. The base case found that the StandBy service dominated usual care with a cost saving from providing the StandBy service of AUS $803 and an increase in quality-adjusted life years of 0.02. Probabilistic sensitivity analysis indicates there is an 81% chance the service would be cost-effective given a range of possible scenarios. Postvention services are a cost-effective strategy and may even be cost-saving if all costs to society from suicide are taken into account.
NASA Astrophysics Data System (ADS)
Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid
2017-10-01
One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.
Brettschneider, Christian; Kohlmann, Sebastian; Gierk, Benjamin; Löwe, Bernd; König, Hans-Helmut
2017-01-01
Although depression is common in patients with heart disease, screening for depression is much debated. DEPSCREEN-INFO showed that a patient-targeted feedback in addition to screening results in lower depression level six months after screening. The purpose of this analysis was to perform a cost-effectiveness analysis of DEPSCREEN-INFO. Patients with coronary heart disease or arterial hypertension were included. Participants in both groups were screened for depression. Participants in the intervention group additionally received a patient-targeted feedback of their result and recommended treatment options. A cost-utility analysis using quality-adjusted life years (QALY) based on the EQ-5D was performed. The time horizon was 6 months. Resource utilization was assessed by a telephone interview. Multiple imputation using chained equations was used. Net-benefit regressions controlled for prognostic variables at baseline were performed to construct cost-effectiveness acceptability curves. Different sensitivity analyses were performed. 375 participants (intervention group: 155; control group: 220) were included at baseline. After 6 months, in the intervention group adjusted total costs were lower (-€2,098; SE: €1,717) and more QALY were gained (0.0067; SD: 0.0133); yet differences were not statistically significant. The probability of cost-effectiveness was around 80% independent of the willingness-to-pay (range: €0/QALY-€130,000/QALY). The results were robust. A patient-targeted feedback in addition to depression screening in cardiology is cost-effective with a high probability. This underpins the use of the patient-targeted feedbacks and the PHQ-9 that are both freely available and easy to implement in routine care.
Outcomes of an antimicrobial control program in a teaching hospital.
Gentry, C A; Greenfield, R A; Slater, L N; Wack, M; Huycke, M M
2000-02-01
The clinical outcomes and cost-effectiveness of an antimicrobial control program (ACP) were studied. The impact of an ACP in a teaching hospital was analyzed by comparing clinical outcomes and intravenous antimicrobial costs over two two-year periods, the two years before the program and the first two years after the program's inception. Admission baseline data, length of stay, mortality, and readmission rates were gathered for each patient. Patients were identified by using the International Classification of Diseases. Multivariate logistic regression models were constructed for mortality and for lengths of stay of 12 or more days. The acquisition costs of intravenous antimicrobial agents for the second baseline year and the entire program period were tabulated and compared. The average daily inpatient census was determined. The ACP was associated with a 2.4-day decrease in length of stay and a reduction in mortality from 8.28% to 6.61%. Rates of readmission for infection within 30 days of discharge remained about the same. Inpatient pharmacy costs other than intravenous antimicrobials decreased an average of only 5.7% over the two program years, but the acquisition cost of intravenous antimicrobials for both program years yielded a total cost saving of $291,885, a reduction of 30.8%. The institution's average daily census fell 19% between the second baseline year and the second program year. An ACP directed by a clinical pharmacist trained in infectious diseases was associated with improvements in inpatient length of stay and mortality. The ACP decreased intravenous antimicrobial costs and facilitated the approval process for restricted and nonformulary antimicrobial agents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kooij, Sanne M. van der, E-mail: s.m.vanderkooij@amc.uva.nl; Moolenaar, Lobke M.; Ankum, Willem M.
Purpose: This study was designed to compare the costs and effects of epidural analgesia (EDA) to those of patient-controlled intravenous analgesia (PCA) for postintervention pain relief in women having uterine artery embolization (UAE) for systematic uterine fibroids. Methods: Cost-effectiveness analysis (CEA) based on data from the literature by constructing a decision tree to model the clinical pathways for estimating the effects and costs of treatment with EDA and PCA. Literature on EDA for pain-relief after UAE was missing, and therefore, data on EDA for abdominal surgery were used. Outcome measures were compared costs to reduce one point in visual analoguemore » score (VAS) or numeric rating scale (NRS) for pain 6 and 24 h after UAE and risk for complications. Results: Six hours after the intervention, the VAS was 3.56 when using PCA and 2.0 when using EDA. The costs for pain relief in women undergoing UAE with PCA and EDA were Euro-Sign 191 and Euro-Sign 355, respectively. The costs for EDA to reduce the VAS score 6 h after the intervention with one point compared with PCA were Euro-Sign 105 and Euro-Sign 179 after 24 h. The risk of having a complication was 2.45 times higher when using EDA. Conclusions: The results of this indirect comparison of EDA for abdominal surgery with PCA for UAE show that EDA would provide superior analgesia for post UAE pain at 6 and 24 h but with higher costs and an increased risk of complications.« less
Study of Subway Station Design and Construction
DOT National Transportation Integrated Search
1977-03-01
Due to the high cost of urban underground transit construction in recent years, construction practices used in other countries were reviewed to determine if construction methods which are commonly accepted there might be adapted to U.S. practice. Des...
Rehabilitation of adobe buildings. Understanding different materials from Portugal
NASA Astrophysics Data System (ADS)
Costa, Cristiana; Rocha, Fernando; Velosa, Ana
2016-04-01
Earth construction is the oldest building material known, with documented cases of the use of earth bricks since Mesopotamia around 10 000 BC (Heathcote, 1995). The earth construction exists throughout the majority of the world in different cultures, and for some countries, nowadays it continues to be the main process of construction (Vega et al, 2011). Around 30% of the world's population lives in buildings made of earth materials. Earthen construction is an environmentally friendly technique with a social and cultural contribution; this advantage is increased when this type of construction is applied in developing countries where the material costs counterbalance with labour costs, and where other materials and techniques cannot be available (Ciancio et al, 2013). Studies of materials characterization are required in order to understand the composition and specific properties of the earth buildings, their heterogeneity and their degradation mechanisms. Some adobes from different buildings, ages and regions of Portugal were collected in order to characterize them (mineralogically, chemically and physically). It was possible to understand the composition of these materials and their differences. Main minerals are quartz, feldspars, calcite and phyllosilicates (mica and kaolinite). The mechanical behaviour of these materials isn't the best, but it is possible to improve it with some simple and cheap natural additives (kaolinitic soils). The characterization of these materials allows us to understand the differences between the materials from the different regions (controlled by locally available raw materials). Understanding these materials, and their properties, it is possible to formulate new ones for repair, conservation and rehabilitation works. The adobe bricks are an alternative of kiln baked bricks which has several advantages and one of the most important is that these materials are recyclable. Adobes are an excellent option for building rehabilitation, if composition is optimised.
Formation of costs of high-rise objects of housing and civil purpose based on enlarged norms
NASA Astrophysics Data System (ADS)
Vorotyntseva, Anna; Ovsiannikov, Andrei; Bolgov, Vladimir
2018-03-01
When determining the cost of capital construction objects, for purposes of pre-design workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.
Key issues for low-cost FGD installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
DePriest, W.; Mazurek, J.M.
1995-12-01
This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.
Cost, production and effectiveness of masticated fireline.
Elizabeth Dodson; Dana Mitchell
2016-01-01
Fire managers are continuously looking for improved methods to construct fireline with minimal resource damage. One option for fireline construction that has so far received limited attention is the use of mastication equipment. This study evaluated a masticating disk mounted on a self-leveling feller- buncher for the cost, speed, and adherence to fireline...
Ground water contaminated with TCE is commonly treated with a passive reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative re...
EFFECTIVE REMOVAL OF TCE IN A LABORATORY MODEL OF A PRB CONSTRUCTED WITH PLANT MULCH
Ground water contaminated with TCE is commonly treated with a permeable reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative ...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2013 CFR
2013-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2011 CFR
2011-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2012 CFR
2012-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2014 CFR
2014-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
BMP COST ANALYSIS FOR SOURCE WATER PROTECTION
Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...
Code of Federal Regulations, 2014 CFR
2014-01-01
... applicable) acquisition costs, construction costs, and other costs capitalized in accordance with GAAP. (2... party); or claims reimbursement of actual interest cost at a rate available via such a transaction. (4) The non-Federal entity limits claims for Federal reimbursement of interest costs to the least...
Sedimentation and the Economics of Selecting an Optimum Reservoir Size
NASA Astrophysics Data System (ADS)
Miltz, David; White, David C.
1987-08-01
This paper attempts to develop an easily reproducible methodology for the economic selection of an optimal reservoir size given an annual sedimentation rate. The optimal capacity is that at which the marginal cost of constructing additional storage capacity is equal to the dredging costs avoided by having that additional capacity available to store sediment. The cost implications of misestimating dredging costs, construction costs, and sediment delivery rates are investigated. In general, it is shown that oversizing is a rational response to uncertainty in the estimation of parameters. The sensitivity of the results to alternative discount rates is also discussed. The theoretical discussion is illustrated with a case study drawn from Highland Silver Lake in southwestern Illinois.
Milanovic, Jovana Z; Milanovic, Predrag; Kragic, Rastislav; Kostic, Mirjana
2018-01-01
In this paper, we present the construction of a reliable and inexpensive pH stat device, by using open-source "OpenPhControl" software, inexpensive hardware (a peristaltic and a syringe pump, Arduino, a step motor…), readily available laboratory devices: a pH meter, a computer, a webcam, and some 3D printed parts. We provide a methodology for the design, development and test results of each part of the device, as well as of the entire system. In addition to dosing reagents by means of a low-cost peristaltic pump, we also present carefully controlled dosing of reagents by an open-source syringe pump. The upgrading of the basic open-source syringe pump is given in terms of pump control and application of a larger syringe. In addition to the basic functions of pH stat, i.e. pH value measurement and maintenance, an improvement allowing the device to be used for potentiometric titration has been made as well. We have demonstrated the device's utility when applied for cellulose fibers oxidation with 2,2,6,6-tetramethylpiperidine-1-oxyl radical, i.e. for TEMPO-mediated oxidation. In support of this, we present the results obtained for the oxidation kinetics, the consumption of added reagent and experimental repeatability. Considering that the open-source scientific tools are available to everyone, and that researchers can construct and adjust the device according to their needs, as well as, that the total cost of the open-source pH stat device, excluding the existing laboratory equipment (pH meter, computer and glossary) was less than 150 EUR, we believe that, at a small fraction of the cost of available commercial offers, our open-source pH stat can significantly improve experimental work where the use of pH stat is necessary.
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...