Age in Relation to Worker Compensation Costs in the Construction Industry
Schwatka, Natalie V.; Butler, Lesley M.; Rosecrance, John C.
2015-01-01
Background A better understanding of how workers’ compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. Methods The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Results Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18–24. Conclusions Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. PMID:22782837
Age in relation to worker compensation costs in the construction industry.
Schwatka, Natalie V; Butler, Lesley M; Rosecrance, John C
2013-03-01
A better understanding of how workers' compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18-24. Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. Copyright © 2012 Wiley Periodicals, Inc.
Evaluation of ways and procedures to reduce construction cost and increase competition.
DOT National Transportation Integrated Search
2009-01-01
Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
Literature review of methods to determine road user costs in construction zones
DOT National Transportation Integrated Search
1997-01-01
As freeway construction increases with the need to expand, repair and maintain the existing infrastructure, the desire to quantify the inconvenience or delay costs to the user of the freeway undergoing construction has increased and become neccessary...
Relative Economy of Different Methods of Airplane Construction
NASA Technical Reports Server (NTRS)
Herrmann, H
1931-01-01
A comparison of the relative economy of airplane construction shows that monoplanes are cheaper than biplanes; that all-metal construction is much more expensive than mixed construction; that multi-engine airplanes are more expensive than single-engine types of the same carrying capacity and speed;that the cost of airplanes is materially reduced by increasing their size without increasing the number of engines. The greatest economy usually coincides with the best aerodynamic and static conditions and the cost is always increased by safety requirements.
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
The Impact of State Regulations on the Costs of Public School Construction
ERIC Educational Resources Information Center
Vincent, Jeffrey M.; Monkkonen, Paavo
2010-01-01
Spending by states and local school districts on school construction has increased dramatically over the last decade, not only because more and higher-quality schools are being built, but also because construction costs have increased by an unprecedented degree. Many states struggle to afford the new schools needed in local communities. The…
DOT National Transportation Integrated Search
1999-05-01
This paper uses Federal Aid Highway program information for 1990 to 1994 to define a natural experiment that evaluates whether compliance with federal environmental regulations increases construction costs. This is accomplished by considering whether...
User costs as one of main advantages of precast concrete application in highway construction
NASA Astrophysics Data System (ADS)
Tomek, Radan
2017-09-01
Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.
A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation
Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869
Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.
NASA Astrophysics Data System (ADS)
Prokhorov, Sergey
2017-10-01
Building industry in a present day going through the hard times. Machine and mechanism exploitation cost, on a field of construction and installation works, takes a substantial part in total building construction expenses. There is a necessity to elaborate high efficient method, which allows not only to increase production, but also to reduce direct costs during machine fleet exploitation, and to increase its energy efficiency. In order to achieve the goal we plan to use modern methods of work production, hi-tech and energy saving machine tools and technologies, and use of optimal mechanization sets. As the optimization criteria there are exploitation prime cost and set efficiency. During actual task-solving process we made a conclusion, which shows that mechanization works, energy audit with production juxtaposition, prime prices and costs for energy resources allow to make complex machine fleet supply, improve ecological level and increase construction and installation work quality.
36 CFR 223.111 - Administration of contracts in designated disaster areas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... road or facility, the United States shall bear such increased construction cost if, as determined by... damages are so great that restoration, reconstruction, or construction is not practical under the cost...
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat
2017-07-01
Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.
ERIC Educational Resources Information Center
Bauer, Heather; Burno, Carolyn; Millstone, Teresa
2009-01-01
The purpose of this research project was to increase constructive behavior of intermediate grade students through the use of the response cost strategy. Approximately 70 students participated in this study. Three teacher researchers conducted the research in an elementary school and two middle schools in different counties near a major mid-western…
Research of cost aspects of cement pavements construction
NASA Astrophysics Data System (ADS)
Bezuglyi, Artem; Illiash, Sergii; Tymoshchuk, Oleksandr
2017-09-01
The tendency to increasing traffic volume on public roads and to increased axle loads of vehicles makes the road scientists to develop scientifically justified methods for preserving the existing and developing the new transport network of Ukraine. One of the options for solving such issues is the construction of roads with rigid (cement concrete) pavement. However, any solution must be justified considering technical and economic components. This paper presents the results of the research of cost aspects of cement pavements construction.
Cost analysis of the built environment: the case of bike and pedestrian trials in Lincoln, Neb.
Wang, Guijing; Macera, Caroline A; Scudder-Soucie, Barbara; Schmid, Tom; Pratt, Michael; Buchner, David; Heath, Gregory
2004-04-01
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calculated. Trail length averaged 3.6 miles (range = 1.6-4.6 miles). Annual cost in 2002 dollars ranged from 25,762 to 248,479 (mean = 124,927; median = 171,064). The cost per mile ranged from 5735 to 54,017 (mean = 35,355; median = 37,994). The annual cost per user was 235 (range = 83-592), whereas per capita annual medical cost of inactivity was 622. Construction of trails fits a wide range of budgets and may be a viable health amenity for most communities. To increase trail cost-effectiveness, efforts to decrease cost and increase the number of users should be considered.
Analysis of strategies to increase external fixator stiffness: is double stacking worth the cost?
Strebe, Sara; Kim, Hyunchul; Russell, Joseph P; Hsieh, Adam H; Nascone, Jason; O'Toole, Robert V
2014-07-01
We compared the mechanical benefits and costs of 3 strategies that are commonly used to increase knee-spanning external fixator stiffness (resistance to deformation): double stacking, cross-linking, and use of an oblique pin. At our academic trauma centre and biomechanical testing laboratory, we used ultra-high-molecular-weight polyethylene bone models and commercially available external fixator components to simulate knee-spanning external fixation. The models were tested in anterior-posterior bending, medial-lateral bending, axial compression, and torsion. We recorded the construct stiffness for each strategy in all loading modes and assessed a secondary outcome of cost per 10% increase in stiffness. Double stacking significantly increased construct stiffness under anterior-posterior bending (109%), medial-lateral bending (22%), axial compression (150%), and torsion (41%) (p<0.05). Use of an oblique pin significantly increased stiffness under torsion (25%) (p<0.006). Cross-linking significantly increased stiffness only under torsion (29%) (p<0.002). Double stacking increased costs by 84%, cross-linking by 28%, and use of an oblique pin by 15% relative to a standard fixator. All 3 strategies increased stiffness under torsion to varying degrees, but only double stacking increased stiffness in all 4 testing modalities (p<0.05). Double stacking is most effective in increasing resistance to bending, particularly under anterior-posterior bending and axial compression, but requires a relatively high cost increase. Clinicians can use these data to help guide the most cost-effective strategy to increase construct stiffness based on the plane in which stiffness is needed. Copyright © 2013 Elsevier Ltd. All rights reserved.
Construction Management: Building Schools Faster in the International Marketplace
ERIC Educational Resources Information Center
Scarano, Joseph J.
1976-01-01
Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)
NASA Astrophysics Data System (ADS)
Chowdhury, Md Mukul
With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.
Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.
Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V
2017-03-01
Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
2014-11-01
thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost...cap, by postponing installation of some systems until after ship delivery, and deferring an estimated $200 million - $250 million in previously
1988-12-01
COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type
Construction of road network vulnerability evaluation index based on general travel cost
NASA Astrophysics Data System (ADS)
Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin
2018-03-01
With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
Sorock, G S; Ranney, T A; Lehto, M R
1996-01-01
Motor vehicle travel through roadway construction workzones has been shown to increase the risk of a crash. The number of workzones has increased due to recent congressional funding in 1991 for expanded roadway maintenance and repair. In this paper, we describe the characteristics and costs of motor vehicle crashes in roadway construction workzones. As opposed to using standard accident codes to identify accident types, automobile insurance claims files from 1990-93 were searched to identify records with the keyword "construction" in the accident narrative field. A total of 3,686 claims were used for the analysis of crashes. Keywords from the accident narrative field were used to identify five pre-crash vehicle activities and five crash types. We evaluated misclassification error by reading 560 randomly selected claims and found it to be only 5%. For each of four years, 1990-93, there was a total of 648,996,977 and 1,065 crashes, respectively. There was a 70% increase in the crash rate per 10,000 personal insured vehicles from 1990-93 (2.1-3.6). Most crashes (26%) involved a stopped or slowing vehicle in the workzone. The most common crash (31%) was a rear-end collision. The most costly pre-crash activity was a major judgment error on the part of a driver (n = 120, median cost = $2,628). An overturned vehicle was the most costly crash type (n = 16, median cost = $4,745). In summary, keyword text analysis of accident narrative data used in this study demonstrated its utility and potential for enhancing injury epidemiology. The results suggest interventions are needed to respond to growing traffic hazards in construction workzones.
Residential building codes, affordability, and health protection: a risk-tradeoff approach.
Hammitt, J K; Belsky, E S; Levy, J I; Graham, J D
1999-12-01
Residential building codes intended to promote health and safety may produce unintended countervailing risks by adding to the cost of construction. Higher construction costs increase the price of new homes and may increase health and safety risks through "income" and "stock" effects. The income effect arises because households that purchase a new home have less income remaining for spending on other goods that contribute to health and safety. The stock effect arises because suppression of new-home construction leads to slower replacement of less safe housing units. These countervailing risks are not presently considered in code debates. We demonstrate the feasibility of estimating the approximate magnitude of countervailing risks by combining the income effect with three relatively well understood and significant home-health risks. We estimate that a code change that increases the nationwide cost of constructing and maintaining homes by $150 (0.1% of the average cost to build a single-family home) would induce offsetting risks yielding between 2 and 60 premature fatalities or, including morbidity effects, between 20 and 800 lost quality-adjusted life years (both discounted at 3%) each year the code provision remains in effect. To provide a net health benefit, the code change would need to reduce risk by at least this amount. Future research should refine these estimates, incorporate quantitative uncertainty analysis, and apply a full risk-tradeoff approach to real-world case studies of proposed code changes.
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. This research project addressed the following questions: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences?more » 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost?« less
A simulation model of hospital management based on cost accounting analysis according to disease.
Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki
2004-12-01
Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
Fu, Fang; Zhang, Tao
2016-01-01
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-09-01
Momentum behind zero energy building design and construction is increasing, presenting a tremendous opportunity for advancing energy performance in the commercial building industry. At the same time, there is a lingering perception that zero energy buildings must be cost prohibitive or limited to showcase projects. Fortunately, an increasing number of projects are demonstrating that high performance can be achieved within typical budgets. This factsheet highlights replicable, recommended strategies for achieving high performance on a budget, based on experiences from past projects.
NASA Astrophysics Data System (ADS)
Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad
2017-11-01
Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.
The costs of housing developments on sites with elevated landslide risk in the UK
NASA Astrophysics Data System (ADS)
Barclay, K.; Heath, A.
2015-09-01
New housing targets are being set for local planning authorities resulting in more areas being zoned for development. There is currently no requirement for a landslide assessment prior to this zoning, and sites at elevated risk of landslides are being put forward for development without consideration of the additional costs and other impacts of building on these higher risk sites. This study aimed to reveal the increased financial, economic, social and environmental costs associated with these decisions. Case studies were focused on the city of Bath, an area of increasing population and “one of the most intensely landslipped areas in Britain’’. The case studies found the financial costs associated with building in a landslide risk area to be significantly higher than the equivalent construction in areas of greater geological stability. Furthermore, it was found that uncertainty in cost when developing in unstable areas exacerbates this problem as the final cost cannot be accurately predicted before construction.
ERIC Educational Resources Information Center
Bortolazzo, Julio L.
San Joaquin Delta College (California), planning on an enrollment increase of more than 10% annually, has estimated its minimum facility needs for an enrollment of approximately 7500 students by 1972. The gross cost per square foot is expected to be $25.00 for general construction and $38.50 for special construction. For an estimated total of…
40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...
40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...
Energy management guidelines for rail transit systems : volume I. final report
DOT National Transportation Integrated Search
1986-09-01
The cost of electricity is a significant portion of the operating costs of rail transit systems. The impact of increasing energy costs is felt by those systems presently in operation and will be felt by those in the planning or construction phases. B...
A study in cost analysis of aggregate production as depending on drilling and blasting design
NASA Astrophysics Data System (ADS)
Bilim, Niyazi; Çelik, Arif; Kekeç, Bilgehan
2017-10-01
Since aggregate production has vital importance for many engineering projects-such as construction, highway and plant-mixed concrete production-this study was undertaken to determine how the costs for such production are affected by the design of drilling and blasting processes used. Aggregates are used in the production of concrete and asphalt, which are critical resources for the construction sector. The ongoing population increase and the growth of living standards around the world drive the increasing demand for these products. As demand grows, competition has naturally arisen among producers in the industry. Competition in the market has directly affected prices, which leads to the need for new measures and cost analysis on production costs. The cost calculation is one of the most important parameters in mining activities. Aggregate production operations include drilling, blasting, secondary crushing (if necessary), loading, hauling and crushing-screening, and each of these factors affects cost. In this study, drilling and blasting design parameters (such as hole diameter, hole depth, hole distance and burden) were investigated and evaluated for their effect on the total cost of quarrying these products, based on a particular quarry selected for this research. As the result of evaluation, the parameters actually driving costs have been identified, and their effects on the cost have been determined. In addition, some suggestions are presented regarding production design which may lead to avoiding increased production costs.
NASA Astrophysics Data System (ADS)
Lilliestam, Johan; Labordena, Mercè; Patt, Anthony; Pfenninger, Stefan
2017-07-01
Concentrating solar power (CSP) capacity has expanded slower than other renewable technologies and its costs are still high. Until now, there have been too few CSP projects to derive robust conclusions about its cost development. Here we present an empirical study of the cost development of all operating CSP stations and those under construction, examining the roles of capacity growth, industry continuity, and policy support design. We identify distinct CSP expansion phases, each characterized by different cost pressure in the policy regime and different industry continuity. In 2008-2011, with low cost pressure and following industry discontinuity, costs increased. In the current phase, with high cost pressure and continuous industry development, costs decreased rapidly, with learning rates exceeding 20%. Data for projects under construction suggest that this trend is continuing and accelerating. If support policies and industrial structure are sustained, we see no near-term factors that would hinder further cost decreases.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... Specially Adapted Housing; Cost-of-Construction Index AGENCY: Department of Veterans Affairs. ACTION: Notice... index. The Secretary uses the Turner Building Cost Index for this purpose. In the most recent quarter for which the Turner Building Cost Index is available, Quarter 2 FY 2013, the index showed an increase...
Durability assessment of prefabricated bridge elements and systems : [research summary].
DOT National Transportation Integrated Search
2015-08-01
Many states have instituted Prefabricated Bridge Elements and Systems : (PBES) and Accelerated Bridge Construction (ABC) projects to decrease : onsite construction time, work zone and user costs, and increase safety : factors; however, the quality an...
An Improved Method for Real-Time 3D Construction of DTM
NASA Astrophysics Data System (ADS)
Wei, Yi
This paper discusses the real-time optimal construction of DTM by two measures. One is to improve coordinate transformation of discrete points acquired from lidar, after processing a total number of 10000 data points, the formula calculation for transformation costs 0.810s, while the table look-up method for transformation costs 0.188s, indicating that the latter is superior to the former. The other one is to adjust the density of the point cloud acquired from lidar, the certain amount of the data points are used for 3D construction in proper proportion in order to meet different needs for 3D imaging, and ultimately increase efficiency of DTM construction while saving system resources.
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
Fast multiview three-dimensional reconstruction method using cost volume filtering
NASA Astrophysics Data System (ADS)
Lee, Seung Joo; Park, Min Ki; Jang, In Yeop; Lee, Kwan H.
2014-03-01
As the number of customers who want to record three-dimensional (3-D) information using a mobile electronic device increases, it becomes more and more important to develop a method which quickly reconstructs a 3-D model from multiview images. A fast multiview-based 3-D reconstruction method is presented, which is suitable for the mobile environment by constructing a cost volume of the 3-D height field. This method consists of two steps: the construction of a reliable base surface and the recovery of shape details. In each step, the cost volume is constructed using photoconsistency and then it is filtered according to the multiscale. The multiscale-based cost volume filtering allows the 3-D reconstruction to maintain the overall shape and to preserve the shape details. We demonstrate the strength of the proposed method in terms of computation time, accuracy, and unconstrained acquisition environment.
Karmarkar, Taruja D; Maurer, Anne; Parks, Michael L; Mason, Thomas; Bejinez-Eastman, Ana; Harrington, Melvyn; Morgan, Randall; O'Connor, Mary I; Wood, James E; Gaskin, Darrell J
2017-12-01
Disparities in the presentation of knee osteoarthritis (OA) and in the utilization of treatment across sex, racial, and ethnic groups in the United States are well documented. We used a Markov model to calculate lifetime costs of knee OA treatment. We then used the model results to compute costs of disparities in treatment by race, ethnicity, sex, and socioeconomic status. We used the literature to construct a Markov Model of knee OA and publicly available data to create the model parameters and patient populations of interest. An expert panel of physicians, who treated a large number of patients with knee OA, constructed treatment pathways. Direct costs were based on the literature and indirect costs were derived from the Medical Expenditure Panel Survey. We found that failing to obtain effective treatment increased costs and limited benefits for all groups. Delaying treatment imposed a greater cost across all groups and decreased benefits. Lost income because of lower labor market productivity comprised a substantial proportion of the lifetime costs of knee OA. Population simulations demonstrated that as the diversity of the US population increases, the societal costs of racial and ethnic disparities in treatment utilization for knee OA will increase. Our results show that disparities in treatment of knee OA are costly. All stakeholders involved in treatment decisions for knee OA patients should consider costs associated with delaying and forgoing treatment, especially for disadvantaged populations. Such decisions may lead to higher costs and worse health outcomes.
Optimal transfers between unstable periodic orbits using invariant manifolds
NASA Astrophysics Data System (ADS)
Davis, Kathryn E.; Anderson, Rodney L.; Scheeres, Daniel J.; Born, George H.
2011-03-01
This paper presents a method to construct optimal transfers between unstable periodic orbits of differing energies using invariant manifolds. The transfers constructed in this method asymptotically depart the initial orbit on a trajectory contained within the unstable manifold of the initial orbit and later, asymptotically arrive at the final orbit on a trajectory contained within the stable manifold of the final orbit. Primer vector theory is applied to a transfer to determine the optimal maneuvers required to create the bridging trajectory that connects the unstable and stable manifold trajectories. Transfers are constructed between unstable periodic orbits in the Sun-Earth, Earth-Moon, and Jupiter-Europa three-body systems. Multiple solutions are found between the same initial and final orbits, where certain solutions retrace interior portions of the trajectory. All transfers created satisfy the conditions for optimality. The costs of transfers constructed using manifolds are compared to the costs of transfers constructed without the use of manifolds. In all cases, the total cost of the transfer is significantly lower when invariant manifolds are used in the transfer construction. In many cases, the transfers that employ invariant manifolds are three times more efficient, in terms of fuel expenditure, than the transfer that do not. The decrease in transfer cost is accompanied by an increase in transfer time of flight.
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
Feasibility of using high-strength steel and MMFX rebar in bridge design.
DOT National Transportation Integrated Search
2009-07-01
Pressed by increases in construction costs coupled with insufficient funding for maintenance and new construction, many state and federal agencies are now specifying a service life of 75 years for all concrete bridges without significant repairs. In ...
Rapid Leaf Deployment Strategies in a Deciduous Savanna
2016-01-01
Deciduous plants avoid the costs of maintaining leaves in the unfavourable season, but carry the costs of constructing new leaves every year. Deciduousness is therefore expected in ecological situations with pronounced seasonality and low costs of leaf construction. In our study system, a seasonally dry tropical savanna, many trees are deciduous, suggesting that leaf construction costs must be low. Previous studies have, however, shown that nitrogen is limiting in this system, suggesting that leaf construction costs are high. Here we examine this conundrum using a time series of soil moisture availability, leaf phenology and nitrogen distribution in the tree canopy to illustrate how trees resorb nitrogen before leaf abscission and use stored reserves of nitrogen and carbon to construct new leaves at the onset of the growing season. Our results show that trees deployed leaves shortly before and in anticipation of the first rains with its associated pulse of nitrogen mineralisation. Our results also show that trees rapidly constructed a full canopy of leaves within two weeks of the first rains. We detected an increase in leaf nitrogen content that corresponded with the first rains and with the movement of nitrogen to more distal branches, suggesting that stored nitrogen reserves are used to construct leaves. Furthermore the stable carbon isotope ratios (δ13C) of these leaves suggest the use of stored carbon for leaf construction. Our findings suggest that the early deployment of leaves using stored nitrogen and carbon reserves is a strategy that is integrally linked with the onset of the first rains. This strategy may confer a competitive advantage over species that deploy leaves at or after the onset of the rains. PMID:27310398
Code of Federal Regulations, 2013 CFR
2013-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Comparison of Navy and Private-Sector Construction Costs
1997-09-01
contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar
Louisiana Department Of Transportation and Development in-house versus consultant design cost study.
DOT National Transportation Integrated Search
1998-06-01
The use of consultants in providing pre-construction engineering design services for the state's Departments of Transportation has increased over the last twenty years. This has resulted in several investigations into the cost-effectiveness of this t...
Comparing in-house staff and consultant costs for highway design and construction.
DOT National Transportation Integrated Search
2011-07-01
In May 2011, the Senate Standing Committee on Budget and Fiscal Review added language to the budget : bill that requires Caltrans to commission an independent study of the costs and benefits of hiring : consultants to address temporary increases in w...
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
Using Sustainable Development as a Competitive Strategy
NASA Astrophysics Data System (ADS)
Spearman, Pat
Sustainable development reduces construction waste by 43%, generating 50% cost savings. Residential construction executives lacking adequate knowledge regarding the benefits of sustainable development practices are at a competitive disadvantage. Drawing from the diffusion of innovation theory, the purpose of this qualitative case study was to explore knowledge acquisition within the bounds of sustainable residential construction. The purposive sample size of 11 executive decision makers fulfilled the sample size requirements and enabled the extraction of meaningful data. Participants were members of the National Home Builders Association and had experience of a minimum of 5 years in residential construction. The research question addressed how to improve knowledge acquisition relating to the cost benefits of building green homes and increase the adoption rate of sustainable development among residential builders. Data were collected via semistructured telephone interviews, field observation, and document analysis. Transcribed data were validated via respondent validation, coded into 5 initial categories aligned to the focus of the research, then reduced to 3 interlocking themes of environment, competitive advantage, and marketing. Recommendations include developing comprehensive public policies, horizontal and vertical communications networks, and green banks to capitalize sustainable development programs to improve the diffusion of green innovation as a competitive advantage strategy. Business leaders could benefit from this data by integrating sustainable development practices into their business processes. Sustainable development reduces operational costs, increases competitive advantage for builders, and reduces greenhouse gas emissions. Implications for social change increase energy independence through conservation and developing a legislative policy template for comprehensive energy strategies. A comprehensive energy strategy promotes economic development, technological gains in all business sectors within the energy industry, and reduces energy costs for consumers.
Ceramic thermal protective coating withstands hostile environment of rotating turbine blades
NASA Technical Reports Server (NTRS)
Liebert, C. H.; Stecura, S.
1975-01-01
Ceramic coatings have low thermal conductivity. They provide potential for increased engine performance, reduced fuel consumption, use of less costly materials or construction procedures, and increased life and durability.
Occupational injury costs and alternative employment in construction trades.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Men, Yurong; Haile, Elizabeth
2007-11-01
To present the costs of fatal and non-fatal days-away-from-work injuries in 50 construction occupations. Our results also provide indirect evidence on the cost exposure of alternative construction workers such as independent contractors, on-call or day labor, contract workers, and temporary workers. We combine data from the Bureau of Labor Statistics on average annual incidence from 2000 to 2002 with updated per-case costs from an existing cost model for occupational injuries. The Current Population Survey provides data on the percentage of alternative construction workers. Construction laborers and carpenters were the two costliest occupations, with 40% of the industry's injury costs. The 10 costliest construction occupations also have a high percentage of alternative workers. The construction industry has both a high rate of alternative employment and high costs of work injury. Alternative workers, often lacking workers' compensation, are especially exposed to injury costs.
Review of palm oil fuel ash and ceramic waste in the production of concrete
NASA Astrophysics Data System (ADS)
Natasya Mazenan, Puteri; Sheikh Khalid, Faisal; Shahidan, Shahiron; Shamsuddin, Shamrul-mar
2017-11-01
High demand for cement in the concrete production has been increased which become the problems in the industry. Thus, this problem will increase the production cost of construction material and the demand for affordable houses. Moreover, the production of Portland cement leads to the release of a significant amount of CO2 and other gases leading to the effect on global warming. The need for a sustainable and green construction building material is required in the construction industry. Hence, this paper presents utilization of palm oil fuel ash and ceramic waste as partial cement replacement in the production of concrete. Using both of this waste in the concrete production would benefit in many ways. It is able to save cost and energy other than protecting the environment. In short, 20% usage of palm oil fuel ash and 30% replacement of ceramic waste as cement replacement show the acceptable and satisfactory strength of concrete.
ERIC Educational Resources Information Center
White, Stacey
2006-01-01
Higher-education institutions are facing financial crises in their capital programs. Constant increases in the cost of oil, combined with material shortages in copper, steel and gypsum products, have contributed to an inexorable rise in the cost of construction. At the same time, capital budgets are decreasing. The result is that the education…
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Comparison of Integrated Testlet and Constructed-Response Question Formats
ERIC Educational Resources Information Center
Slepkov, Aaron D.; Shiell, Ralph C.
2014-01-01
Constructed-response (CR) questions are a mainstay of introductory physics textbooks and exams. However, because of the time, cost, and scoring reliability constraints associated with this format, CR questions are being increasingly replaced by multiple-choice (MC) questions in formal exams. The integrated testlet (IT) is a recently developed…
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
NASA Astrophysics Data System (ADS)
Khandelwal, P.; Pachori, A.; Khandelwal, T.
2013-12-01
This paper provides the complete information related to Right of Way (RoW) for the construction of new power transmission line (TL) in terms of present cost for overhead transmission line and underground XLPE transmission cable. The former part of the paper describes the general procedure and rules for acquisition of land for RoW by transmission asset owner (TAO) while in the later part the cost associated to acquire RoW and its impact on the cost of adjacent land have been detailed. It also discusses the actual dismantling cost including the cost of waste metal what TAO get after completion of lifecycle of TL due to increase in metal prices. In this paper cost of RoW after completion of lifecycle of TL is also highlighted. This paper compares the cost of RoW for overhead transmission line and underground XLPE transmission cable for construction of new TL. Also for old transmission infrastructure cost of RoW for change from overhead transmission line to underground XLPE transmission cable is detailed by application of replacement model.
Bidding cost evaluation with fuzzy methods on building project in Jakarta
NASA Astrophysics Data System (ADS)
Susetyo, Budi; Utami, Tin Budi
2017-11-01
National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Daylighting in Schools: Improving Student Performance and Health at a Price Schools Can Afford.
ERIC Educational Resources Information Center
Plympton, Patricia; Conway, Susan; Epstein, Kyra
This document discusses evidence regarding daylighting and student performance and development, and presents four case studies of schools that have cost effectively implemented daylighting into their buildings. Case studies reveal that design and construction strategies that incorporate daylighting do not significantly increase costs over…
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Costs of occupational injuries in construction in the United States.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong
2007-11-01
This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.
NASA Astrophysics Data System (ADS)
Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda
2018-03-01
The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.
Albuquerque's constructed wetland pilot project for wastewater polishing
Michael D. Marcus; Shannon M. House; Nathan A. Bowles; Robert T. Sekiya; J. Steven Glass
1999-01-01
The City of Albuquerque has funded the Constructed Wetland Pilot Project (CWPP) since 1995 at the City's Southside Water Reclamation Plant (SWRP). Results from CWPP and other wetland treatment projects indicate that appropriately designed surface-flow wetlands could increase the cost-efficiencies of wastewater treatment, as well as help the City meet present and...
Construction of an Inexpensive Copper Heat-Pipe Oven
ERIC Educational Resources Information Center
Grove, T. T.; Hockensmith, W. A.; Cheviron, N.; Grieser, W.; Dill, R.; Masters, M. F.
2009-01-01
We present a new, low-cost method of building an all copper heat-pipe oven that increases the practicality of this device in advanced undergraduate instructional labs. The construction parts are available at local hardware and plumbing supply stores, and the assembly techniques employed are simple and require no machining. (Contains 1 footnote, 3…
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
DOT National Transportation Integrated Search
1995-02-01
Pavement related effects of changes in truck size and weight regulations include the following: (1) Increased traffic loadings require thicker pavements which, in turn, increase the construction cost of pavements. (2) For existing pavements, increase...
NASA Astrophysics Data System (ADS)
Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy
2018-03-01
This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.
Cost of unintended pregnancy in Norway: a role for long-acting reversible contraception
Henry, Nathaniel; Schlueter, Max; Lowin, Julia; Lekander, Ingrid; Filonenko, Anna; Trussell, James; Skjeldestad, Finn Egil
2015-01-01
Objectives The objective of this study was to quantify the cost burden of unintended pregnancies (UPs) in Norway, and to estimate the proportion of costs due to imperfect contraceptive adherence. Potential cost savings that could arise from increased uptake of long-acting reversible contraception (LARC) were also investigated. Methods An economic model was constructed to estimate the total number of UPs and associated costs in women aged 15–24 years. Adherence-related UP was estimated using ‘perfect use’ and ‘typical use’ contraceptive failure rates. Potential savings from increased use of LARC were projected by comparing current costs to projected costs following a 5% increase in LARC uptake. Results Total costs from UP in women aged 15–24 years were estimated to be 164 million Norwegian Kroner (NOK), of which 81.7% were projected to be due to imperfect contraceptive adherence. A 5% increase in LARC uptake was estimated to generate cost savings of NOK 7.2 million in this group. Conclusions The cost of UP in Norway is substantial, with a large proportion of this cost arising from imperfect contraceptive adherence. Increased LARC uptake may reduce the UP incidence and generate cost savings for both the health care payer and contraceptive user. PMID:25537792
Construction cost forecast model : model documentation and technical notes.
DOT National Transportation Integrated Search
2013-05-01
Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...
Trends in highway construction costs in Louisiana : technical summary.
DOT National Transportation Integrated Search
1999-09-01
The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2013 CFR
2013-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2014 CFR
2014-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2010 CFR
2010-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2011 CFR
2011-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2012 CFR
2012-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
2013-12-01
such poor condition that it had to have major rehabilitation work performed. Work to fix the deteriorated tunnel cost $10 million more than had...originally been estimated.19 Corps officials on the Little Calumet project said during construction they encountered a former landfill along one portion
Global cost analysis on adaptation to sea level rise based on RCP/SSP scenarios
NASA Astrophysics Data System (ADS)
Kumano, N.; Tamura, M.; Yotsukuri, M.; Kuwahara, Y.; Yokoki, H.
2017-12-01
Low-lying areas are the most vulnerable to sea level rise (SLR) due to climate change in the future. In order to adapt to SLR, it is necessary to decide whether to retreat from vulnerable areas or to install dykes to protect them from inundation. Therefore, cost- analysis of adaptation using coastal dykes is one of the most essential issues in the context of climate change and its countermeasures. However, few studies have globally evaluated the future costs of adaptation in coastal areas. This study tries to globally analyze the cost of adaptation in coastal areas. First, global distributions of projected inundation impacts induced by SLR including astronomical high tide were assessed. Economic damage was estimated on the basis of the econometric relationship between past hydrological disasters, affected population, and per capita GDP using CRED's EM-DAT database. Second, the cost of adaptation was also determined using the cost database and future scenarios. The authors have built a cost database for installed coastal dykes worldwide and applied it to estimating the future cost of adaptation. The unit costs of dyke construction will increase with socio-economic scenario (SSP) such as per capita GDP. Length of vulnerable coastline is calculated by identifying inundation areas using ETOPO1. Future cost was obtained by multiplying the length of vulnerable coastline and the unit cost of dyke construction. Third, the effectiveness of dyke construction was estimated by comparing cases with and without adaptation.As a result, it was found that incremental adaptation cost is lower than economic damage in the cases of SSP1 and SSP3 under RCP scenario, while the cost of adaptation depends on the durability of the coastal dykes.
Costs of Occupational Injuries in Construction in the United States
Waehrer, Geetha M.; Dong, Xiuwen S.; Miller, Ted; Haile, Elizabeth; Men, Yurong
2008-01-01
This paper presents costs of fatal and non-fatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and non-fatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry’s total fatal and non-fatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs. PMID:17920850
48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...
Branton, Scott; Lile, Lawrence
2011-01-01
By incorporating even the basic elements of a more environmentally friendly, "green"construction and design in an MRI setting can create a safer, more pleasant space for the patients and staff, better images, and operational cost savings. Using building systems that have reduced amounts of steel can decrease construction time, increase thermal insulation, and reduce the weight of the structure meaning less energy required to transport and install. HVAC systems and lighting design can also play a major role in creating a "green"MRI suite. LEED certification places a focus on quality of the built environment, life cycle cost, and a productive indoor environment, as well as impact on the exterior environment. An LEED certified building considers costs and benefits for the lifetime of the building.
48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...
Space construction system analysis. Part 2: Cost and programmatics
NASA Technical Reports Server (NTRS)
Vonflue, F. W.; Cooper, W.
1980-01-01
Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.
Foda, Abd Al-Rahman Mohammad
2013-05-01
Manual tissue microarray (TMA) construction had been introduced to avoid the high cost of automated and semiautomated techniques. The cheapest and simplest technique for constructing manual TMA was that of using mechanical pencil tips. This study was carried out to modify this method, aiming to raise its quality to reach that of expensive ones. Some modifications were introduced to Shebl's technique. Two conventional mechanical pencil tips of different diameters were used to construct the recipient blocks. A source of mild heat was used, and blocks were incubated at 38°C overnight. With our modifications, 3 high-density TMA blocks were constructed. We successfully performed immunostaining without substantial tissue loss. Our modifications increased the number of cores per block and improved the stability of the cores within the paraffin block. This new, modified technique is a good alternative for expensive machines in many laboratories.
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
NASA Astrophysics Data System (ADS)
Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.
2017-11-01
Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.
Highway Cost Index Estimator Tool
DOT National Transportation Integrated Search
2017-10-01
To plan and program highway construction projects, the Texas Department of Transportation requires accurate construction cost data. However, due to the number of, and uncertainty of, variables that affect highway construction costs, estimating future...
[A cost-benefit analysis of different therapeutic methods in menorrhagia].
Kirschner, R
1995-02-20
When deciding the right forms of treatment for various medical conditions it has been usual to consider medical knowledge, norms and experience. Increasingly, economic factors and principles are being introduced by the management, in the form of health economics and pharmaco-economic analyses, enforced as budgetary cuts and demands for rationalisation and measures to increase efficiency. Economic evaluations require construction of models for analyses. We have used DRG-information, National Health reimbursements and pharmacological retail prices to make a cost-efficiency analysis of treatments of menorrhagia. The analysis showed better cost-efficiency for certain pharmacological treatments than for surgery.
The impact of climate change on transportation in the gulf coast
Savonis, M.J.; Burkett, V.R.; Potter, J.R.; Kafalenos, R.; Hyman, R.; Leonard, K.
2009-01-01
Climate affects the design, construction, safety, operations, and maintenance of transportation infrastructure and systems. The prospect of a changing climate raises critical questions regarding how alterations in temperature, precipitation, storm events, and other aspects of the climate could affect the nation's transportation system. This regional assessment of climate change and its potential impacts on transportation systems addresses these questions for the central Gulf Coast between Houston and Mobile. Warming temperatures are likely to increase the costs of transportation construction, maintenance, and operations. More frequent extreme precipitation events will likely disrupt transportation networks with flooding and visibility problems. Relative sea level rise will make much of the existing infrastructure more prone to frequent or permanent inundation. Increased storm intensity may lead to increased service disruption and damage. Consideration of these factors in today's transportation decisions should lead to a more robust, resilient, and cost-effective transportation network in the coming decades. ?? 2009 ASCE.
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
Based on an evaluation of 10 residential new construction programs, primarily sponsored by investor-owned utilities in the United States, we find that many of these programs are in dire straits and are in danger of being discontinued because current inclusion of only direct program effects leads to the conclusion that they are not cost-effective. We believe that the cost-effectiveness of residential new construction programs can be improved by: (1) promoting technologies and advanced building design practices that significantly exceed state and federal standards; (2) reducing program marketing costs and developing more effective marketing strategies; (3) recognizing the role of thesemore » programs in increasing compliance with existing state building codes; and (4) allowing utilities to obtain an ``energy-savings credit`` from utility regulators for program spillover (market transformation) impacts. Utilities can also leverage their resources in seizing these opportunities by forming strong and trusting partnerships with the building community and with local and state government.« less
Implementation and Testing of Low Cost Uav Platform for Orthophoto Imaging
NASA Astrophysics Data System (ADS)
Brucas, D.; Suziedelyte-Visockiene, J.; Ragauskas, U.; Berteska, E.; Rudinskas, D.
2013-08-01
Implementation of Unmanned Aerial Vehicles for civilian applications is rapidly increasing. Technologies which were expensive and available only for military use have recently spread on civilian market. There is a vast number of low cost open source components and systems for implementation on UAVs available. Using of low cost hobby and open source components ensures considerable decrease of UAV price, though in some cases compromising its reliability. In Space Science and Technology Institute (SSTI) in collaboration with Vilnius Gediminas Technical University (VGTU) researches have been performed in field of constructing and implementation of small UAVs composed of low cost open source components (and own developments). Most obvious and simple implementation of such UAVs - orthophoto imaging with data download and processing after the flight. The construction, implementation of UAVs, flight experience, data processing and data implementation will be further covered in the paper and presentation.
3D-FEM Analysis on Geogrid Reinforced Flexible Pavement Roads
NASA Astrophysics Data System (ADS)
Calvarano, Lidia Sarah; Palamara, Rocco; Leonardi, Giovanni; Moraci, Nicola
2017-12-01
Nowadays, the need to increase pavement service life, guarantee high performance, reduce service and maintenance costs has been turned a greater attention on the use of reinforcements. This paper presents findings of a numerical investigation on geogrid reinforced flexible pavement roads, under wheel traffic loads, using a three-dimensional Finite Element Method (FEM). The results obtained show the effectiveness of glass fibre grids as reinforcement which, with appropriate design and correct installation, by improving interface shear resistance, can be used to expand the performance of flexible pavements in different ways: by increasing the road service life providing a relevant contribution against superficial rutting or by decreasing the construction costs due to the reduction in the reinforced HMA layer thickness and thus of mineral aggregate required for its construction.
Value engineering awareness study for sustainable construction in Malaysia
NASA Astrophysics Data System (ADS)
U, Fathoni; M, Zakaria C.; O, Rohayu C.
2013-06-01
Construction process has often been described as a highly complex process because of the number of disciplines involved during the conceptual, design and construction stage. With the emergence of latest technology and concern for environment, increasing attention in construction industry is given on sustainability. Balance in quality and sustainability has become a major challenge to the construction industry. This paper presents a study that has conducted to determine the acceptance and application of Value Engineering (VE) and Life Cycle Cost Analysis (LCCA) in Malaysia construction industry. A set of questionnaire have distributed to different practitioners in construction industry and the result has reflect the fact that the application of VE and LCCA are still very low.
Environmental trade-offs of tunnels vs cut-and-cover subways
Walton, M.
1978-01-01
Heavy construction projects in cities entail two kinds of cost - internal cost, which can be defined in terms of payments from one set of parties to another, and external cost, which is the cost borne by the community at large as the result of disutilities entailed in construction and operation. Environmental trade-offs involve external costs, which are commonly difficult to measure. Cut-and-cover subway construction probably entails higher external and internal cost than deep tunnel construction in many urban geological environments, but uncertainty concerning the costs and environmental trade-offs of tunneling leads to limited and timid use of tunneling by American designers. Thus uncertainty becomes a major trade-off which works against tunneling. The reverse is true in Sweden after nearly 30 years of subway construction. Econometric methods for measuring external costs exist in principle, but are limited in application. Economic theory based on market pressure does not address the real problem of urban environmental trade-offs. Nevertheless, the problem of uncertainty can be addressed by comparative studies of estimated and as-built costs of cut-and-cover vs tunnel projects and a review of environmental issues associated with such construction. Such a study would benefit the underground construction industry and the design of transportation systems. It would also help solve an aspect of the urban problem. ?? 1978.
48 CFR 2825.203 - Evaluating offers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... designee at a level not lower than the BPC, is the agency official authorized to make determination that using a particular domestic construction material would unreasonably increase the cost of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. The following research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story singlemore » family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
Oil and gas pipeline construction cost analysis and developing regression models for cost estimation
NASA Astrophysics Data System (ADS)
Thaduri, Ravi Kiran
In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.
Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.
ERIC Educational Resources Information Center
Bilginsoy, Cihan; Philips, Peter
2000-01-01
Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…
Belowground advantages in construction cost facilitate a cryptic plant invasion
Caplan, Joshua S.; Wheaton, Christine N.; Mozdzer, Thomas J.
2014-01-01
The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. PMID:24938305
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
Clinical and health care aspects of respiratory tract disorders in Poland.
Kanecki, Krzysztof; Zycinska, Katarzyna; Tyszko, Piotr
2016-01-01
Respiratory diseases constitute a public health priority worldwide. This is related to the increasing exposure to microorganisms, toxic factors, allergens, drugs and smoking, as the most important factors. Increasing costs of health promotion, prevention, diagnosis and treatment of respiratory tract diseases forces the search for effective strategies in the reduction of costs without making a significant impact of these activities on health results. Chronic obstructive pulmonary disease (COPD) is an example of these diseases with increasing incidence, which has few known modifiable factors and absorbs large medical and social costs. The aim of this study is to present the conception of cost driver analysis that could be useful in constructing a good combination of the EBM-based treatment with cost reduction decisions. Analysis of cost drivers was based on the Global Initiative for Chronic Obstructive Lung Disease (GOLD) guidelines and Polish recommendations of COPD diagnosis and treatment. The proposition of cost reduction strategy in COPD treatment was based on identification of cost drivers in value chain conception. An increasing incidence and treatment costs of COPD force the search for methods of costs reduction in health care. Identifying, evaluating and modifying the cost drivers with use of the value chain conception could be an effective method in achieving these objectives.
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
Construction of shipping channels in the Detroit River—History and environmental consequences
Bennion, David H.; Manny, Bruce A.
2011-01-01
The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.
Revisiting the cognitive buffer hypothesis for the evolution of large brains
Sol, Daniel
2008-01-01
Why have some animals evolved large brains despite substantial energetic and developmental costs? A classic answer is that a large brain facilitates the construction of behavioural responses to unusual, novel or complex socioecological challenges. This buffer effect should increase survival rates and favour a longer reproductive life, thereby compensating for the costs of delayed reproduction. Although still limited, evidence in birds and mammals is accumulating that a large brain facilitates the construction of novel and altered behavioural patterns and that this ability helps dealing with new ecological challenges more successfully, supporting the cognitive-buffer interpretation of the evolution of large brains. PMID:19049952
DOT National Transportation Integrated Search
2001-09-01
In previous years there has been a problem with longitudinal joint : deterioration, due in part to poor construction techniques. : The degradation of the longitudinal joints has increased the cost of : maintaining these projects and caused unnecessar...
Life-cycle Economic and Environmental Effects of Green, Gray and Hybrid Stormwater Infrastructure
NASA Astrophysics Data System (ADS)
Stokes-Draut, J. R.; Taptich, M. N.; Horvath, A.
2016-12-01
Cities throughout the U.S. are seeking efficient ways to manage stormwater for many reasons, including flood control, pollution management, water supply augmentation and to prepare for a changing climate. Traditionally, cities have relied primarily on gray infrastructure, namely sewers, storage and treatment facilities. In these systems, urban runoff, its volume increasing as impervious surfaces expand, is channeled to a wastewater plant where it is mixed with raw sewage prior to treatment or it is discharged, generally untreated, to local water bodies. These facilities are inflexible and expensive to build and maintain. Many systems are deteriorating and/or approaching, if not exceeding, their design capacity. Increasingly, more innovative approaches that integrate stormwater management into the natural environment and that make sense at both local and regional scales are sought. Identifying the best stormwater solution will require evaluating the life-cycle economic costs associated with these alternatives, including costs associated with construction, operation, and maintenance including regulatory and permitting costs, financing, as well as other indirect costs (e.g., avoided wastewater processing or system capacity expansion, increased property value) and non-economic co-benefits (i.e, aesthetics, habitat provision). Beyond conventional life-cycle costing, applying life-cycle assessment (LCA) will contribute to more holistic and sustainable decision-making. LCA can be used to quantitatively track energy use, greenhouse gas emissions, and other environmental effects associated with constructing, operating, and maintaining green and gray infrastructure, including supply chain contributions. We will present the current state of knowledge for implementing life-cycle costing and LCA into stormwater management decisions for green, gray and hybrid infrastructure.
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO₂ emissions of input materials for each structural frame type. In addition, the CO₂ emissions cost was measured using the trading price of CO₂ emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO₂ emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO₂ emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future.
Håkansson, Andreas
2015-01-01
Health-related illnesses such as obesity and diabetes continue to increase, particularly in groups of low socioeconomic status. The increasing cost of nutritious food has been suggested as an explanation. To construct a price index describing the cost of a diet adhering to nutritional recommendations for a rational and knowledgeable consumer and, furthermore, to investigate which nutrients have become more expensive to obtain over time. Linear programming and goal programming were used to calculate two optimal and nutritious diets for each year in the interval under different assumptions. The first model describes the rational choice of a cost-minimizing consumer; the second, the choice of a consumer trying to deviate as little as possible from average consumption. Shadow price analysis was used to investigate how nutrients contribute to the diet cost. The cost of a diet adhering to nutritional recommendations has not increased more than general food prices in Sweden between 1980 and 2012. However, following nutrient recommendations increases the diet cost even for a rational consumer, particularly for vitamin D, iron, and selenium. The cost of adhering to the vitamin D recommendation has increased faster than the general food prices. Not adhering to recommendations (especially those for vitamin D) offers an opportunity for consumers to lower the diet cost. However, the cost of nutritious diets has not increased more than the cost of food in general between 1980 and 2012 in Sweden.
Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272
DOT National Transportation Integrated Search
2009-12-22
One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...
ERIC Educational Resources Information Center
Gopal, Venkatesh; Klosowiak, Julian L.; Jaeger, Robert; Selimkhanov, Timur; Hartmann, Mitra J. Z.
2008-01-01
We describe the construction and operation of three low-cost schlieren imaging systems that can be fabricated using surplus optics and 80/20, an aluminium extrusion based construction system. Each system has a different optical configuration. The low cost and ease of construction makes these systems highly suitable for high-school and…
43 CFR 1815.1-1 - Relief granted.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the United States will bear a share of the increased construction costs. The United States' share will... authorized officer determines that the damages caused by such major physical change are so great that...
43 CFR 1815.1-1 - Relief granted.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the United States will bear a share of the increased construction costs. The United States' share will... authorized officer determines that the damages caused by such major physical change are so great that...
43 CFR 1815.1-1 - Relief granted.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the United States will bear a share of the increased construction costs. The United States' share will... authorized officer determines that the damages caused by such major physical change are so great that...
43 CFR 1815.1-1 - Relief granted.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the United States will bear a share of the increased construction costs. The United States' share will... authorized officer determines that the damages caused by such major physical change are so great that...
48 CFR 42.1302 - Suspension of work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...
48 CFR 42.1302 - Suspension of work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...
48 CFR 42.1302 - Suspension of work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...
48 CFR 42.1302 - Suspension of work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...
48 CFR 42.1302 - Suspension of work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Delay of Work 42.1302 Suspension of work. A suspension of work under a construction or architect... suspension is unreasonable, the contractor may submit a written claim for increases in the cost of...
1990-09-01
following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W
Papercrete brick as an alternate building material to control Environmental Pollution
NASA Astrophysics Data System (ADS)
Sudarsan, J. S.; Ramesh, S.; Jothilingam, M.; Ramasamy, Vishalatchi; Rajan, Rajitha J.
2017-07-01
Utilization of concrete in the construction industry is increasing day by day. The increasing demand for concrete in the future is the major issue, for which an alternate option is to find out at a reduced or no additional cost and to reduce the environmental impact due to increase of cement industries that are important ingredient to economic development. It turns out urgent to find out alternate for the partial replacement of concrete and cement, as natural sources of aggregates are becoming exhausted. As large quantity of paper waste is generated from different countries all over the world which causes serious environmental problems, So in this present study abandoned paper waste was used as a partial replacement material in concrete,. Study indicates that 80% of the construction cost of a building was contributed by building material and still millions of people in developing countries like India are not able to afford the cost of construction of house. This study is based on potential use of light weight composite brick as a building material and potential use of paper waste for producing at low-cost. Experimental investigation was carried out to analyse optimization of mix for papercrete bricks depending upon the water absorption, compressive strength and unit weight. Papercrete bricks were prepared out of waste paper, and quarry dust with partial replacement of cement by another industrial by-product Fly Ash in varying proportions of 25%, 40% and 55%. The properties like mechanical strength, standard quality comparisons with the conventional bricks through standard tests like hardness, soundness, fire resistance and Cost-Benefit Analysis were performed and studied. The specimens of dimension 230mm x 110mm x 80mm were subjected to 7 Days and 28 days air curing and sun drying before tests were performed on them. Based on the study it was found that for non-load bearing walls papercrete bricks are best suited.
Cost estimators for construction of forest roads in the central Appalachians
Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler
1992-01-01
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...
Black, Amanda Y; Guilbert, Edith; Hassan, Fareen; Chatziheofilou, Ismini; Lowin, Julia; Jeddi, Mark; Filonenko, Anna; Trussell, James
2015-12-01
Unintended pregnancies (UPs) are associated with a significant cost burden, but the full cost burden in Canada is not known. The objectives of this study were to quantify the direct cost of UPs in Canada, the proportion of cost attributable to UPs and imperfect contraceptive adherence and the potential cost savings with increased uptake of long-acting reversible contraceptives (LARCs). A cost model was constructed to estimate the annual number and direct costs of UP in women aged 18 to 44 years. Adherence-associated UP rates were estimated using perfect- and typical-use contraceptive failure rates. Change in annual number of UPs and impact on cost burden were projected in three scenarios of increased LARC usage. One-way sensitivity analyses were conducted to assess the impact of key variables on scenarios of increased LARC use. There are more than 180 700 UPs annually in Canada. The associated direct cost was over $320 million. Fifty-eight percent (58%) of UPs occurred in women aged 20 to 29 years at an annual cost of $175 million; 82% of this cost ($143 million) was attributable to contraceptive non-adherence. Increased LARC uptake produced cost savings of over $34 million in all three switching scenarios; the largest savings ($35 million) occurred when 10% of oral contraceptive users switched to LARCs. The minimum duration of LARC usage required before cost savings was realized was 12 months. The cost of UPs in Canada is significant and much of it can be attributed to imperfect contraceptive adherence. Increased LARC uptake may reduce contraceptive non-adherence, thereby reducing rates of UP and generating significant cost savings, particularly in women aged 20 to 29.
NASA Technical Reports Server (NTRS)
1976-01-01
Public Technology Inc. asked for NASA assistance to devise the original firefighter's radio. Good short-range radio communications are essential during a fire to coordinate hose lines, rescue victims, and otherwise increase efficiency. Useful firefighting tool is lower cost, more rugged short range two-way radio. Inductorless electronic circuit replaced inductances and coils in radio circuits with combination of transistors and other low-cost components. Substitution promises reduced circuit size and cost. Enhanced electrical performance made radio more durable and improved maintainability by incorporating modular construction.
Modern methods of cost saving of the production activity in construction
NASA Astrophysics Data System (ADS)
Silka, Dmitriy
2017-10-01
Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.
NASA Astrophysics Data System (ADS)
Serrano Juan, Alejandro; Vázquez-Suñè, Enric; Pujades, Estanislao; Velasco, Violeta; Criollo, Rotman; Jurado, Anna
2016-04-01
Underground constructions search the most efficient solutions to increase safety, reduce impacts in both underground construction (such as bottom slab water pressures) and groundwater (such as groundwater barrier effect), reduce future maintenance processes and ensure that everything is implemented by the minimum cost. Even being all the previous solutions directly related to groundwater, independent solutions are usually designed to independently deal with each problem. This paper shows how with a groundwater by-pass design that enables the groundwater flow through the structure it is possible to provide an homogeneous distribution of the water pressures under the bottom slab and reduce the barrier effect produced by the structure. The new integrated design has been applied to the largest infrastructure of Barcelona: La Sagrera railway station. Through a hydrogeological model has been possible to test the project and the integrated designs in three different scenarios. This new solution resolves the barrier effect produced by the structure and optimizes the bottom slab, reducing considerably the costs and increasing safety during the construction phase.
Field study of integral backwall with elastic inclusion.
DOT National Transportation Integrated Search
2005-01-01
Jointless construction is considered an effective design option to reduce bridge maintenance costs and resist seismic loads. Although these attributes make the integral bridge an increasingly popular choice, soil-structure interaction issues unique t...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison, T. J.
2014-02-01
The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well knownmore » based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs.« less
25 CFR 136.3 - Repayment of construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Repayment of construction costs. 136.3 Section 136.3 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.3 Repayment of construction costs. Under the terms of the contracts, the...
Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].
ERIC Educational Resources Information Center
Geothermal Heat Pump Consortium, Inc., Washington, DC.
A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)
48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO2 emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO2 emissions of input materials for each structural frame type. In addition, the CO2 emissions cost was measured using the trading price of CO2 emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO2 emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO2 emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future. PMID:24227998
ERIC Educational Resources Information Center
Sung, Kyung Hee; Noh, Eun Hee; Chon, Kyong Hee
2017-01-01
With increased use of constructed response items in large scale assessments, the cost of scoring has been a major consideration (Noh et al. in KICE Report RRE 2012-6, 2012; Wainer and Thissen in "Applied Measurement in Education" 6:103-118, 1993). In response to the scoring cost issues, various forms of automated system for scoring…
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...
NASA Astrophysics Data System (ADS)
Rahman, R.; Nemmang, M. S.; Hazurina, Nor; Shahidan, S.; Khairul Tajuddin Jemain, Raden; Abdullah, M. E.; Hassan, M. F.
2017-11-01
The main issue related to this research was to examine the feasibility of natural rubber SMR 20 in the manufacturing of cement mortar for sub-base layer construction. Subbase layers have certain functions that need to be fulfilled in order to assure strong and adequate permeability of pavement performance. In a pavement structure, sub-base is below the base and serves as the foundation for the overall pavement structure, transmitting traffic loads to the sub-grade and providing drainage. Based on this research, the natural rubber, SMR 20 was with the percentages of 0%, 5%, 10% and 15% to mix with sand in the manufacture of the cement mortar. This research describes some of the properties and cost of the materials for the natural rubber and sand in cement mortar manufacturing by laboratory testing. Effects of the natural rubber replacement on mechanical properties of mortar were investigated by laboratory testing such as compressive strength test and density. This study obtained the 5% of natural rubber replaced in sand can achieved the strength of normal mortar after 7 days and 28 days. The strength of cement mortar depends on the density of cement mortar. According to the cost of both materials, sand shows the lower cost in material for the cement mortar manufacturing than the uses of natural rubber. Thus, the convectional cement mortar which used sand need lower cost than the modified rubber cement mortar and the most economical to apply in industrial. As conclusion, the percentage of 5% natural rubber in the cement mortar would have the same with normal cement mortar in terms of the strength. However, in terms of the cost of the construction, it will increase higher than cost of normal cement mortar production. So that, this modified cement mortar is not economical for the road sub-base construction.
Energy balance and economic feasibility of shallow geothermal systems for winery industry
NASA Astrophysics Data System (ADS)
Ruiz-Mazarrón, F.; Almoguera-Millán, J.; García-Llaneza, J.; Perdigones, A.
2012-04-01
The search of energy efficient solutions has not yet been accomplished in agro-food constructions, for which technical studies and orientations are needed to find energy efficient solutions adapted to the environment. The main objective of this investigation is to evaluate the effectiveness of using shallow geothermal energy for the winery industry. World wine production in 2009 stood at 27100 millions of litres [1]. World spends 320 billion Euros on wine a year, according to industry insiders. On average, it is estimated that producing 1 litre of wine sold in a 75 cl glass bottle costs around 0.5-1.2 Euros /litre [2]. The process of ageing the wine could substantially increase production costs. Considering the time required for the aging of wine (months or years) and the size of the constructions, the use of an air conditioning system implies a considerable increase in energy consumption. Underground wine cellars have been in use for centuries for making and ageing wine. Ground thermal inertia provides protection from outdoor temperature oscillation and maintains thermal stability without energy consumption [3]. Since the last century, production of wine has moved to buildings above ground that have several advantages: lower construction cost, more space, etc. Nevertheless, these constructions require a large energy consumption to maintain suitable conditions for the ageing and conservation of wine. This change of construction techniques is the cause of an increase in energy consumption in modern wineries. The use of shallow geothermal energy can be a good alternative to take advantage of the benefits of aboveground buildings and underground constructions simultaneously. Shallow geothermal systems can meet the needs of heating and cooling using a single installation, maintaining low energy consumption. Therefore, it could be a good alternative to conventional HVAC systems. The main disadvantage of geothermal systems is the high cost of investment required. This paper analyzes the use of shallow geothermal systems in wineries, studying its feasibility versus conventional HVAC systems. A comparative analysis of six European locations will be performed. [1] OIV, Assessment on the world vitiviniculture situation in 2010, in, Organisation Internationale de la Vigne et du Vin, 2010. [2] FAO, Agribusiness Handbook: Grapes Wine, in, Investment Centre Division. FAO, 2009. [3] F.R. Mazarrón, J. Cid-Falceto, I. Cañas, An assessment of using ground thermal inertia as passive thermal technique in the wine industry around the world, Applied Thermal Engineering, 33-34 (0) (2012) 54-61.
Cavatte, Paulo C; Rodríguez-López, Nélson F; Martins, Samuel C V; Mattos, Mariela S; Sanglard, Lílian M V P; Damatta, Fábio M
2012-05-01
In this study, the combined effects of light and water availability on the functional relationships of the relative growth rate (RGR), leaf chemical composition, construction and maintenance costs, and benefits in terms of payback time for Coffea arabica are presented. Coffee plants were grown for 8 months in 100% or 15% full sunlight and then a four-month water shortage was implemented. Plants grown under full sunlight were also transferred to shade and vice versa. Overall, most of the traits assessed were much more responsive to the availability of light than to the water supply. Larger construction costs (12%), primarily associated with elevated phenol and alkaloid pools, were found under full sunlight. There was a positive correlation between these compounds and the RGR, the mass-based net carbon assimilation rate and the carbon isotope composition ratio, which, in turn, correlated negatively with the specific leaf area. The payback time was remarkably lower in the sun than in shade leaves and increased greatly in water-deprived plants. The differences in maintenance costs among the treatments were narrow, with no significant impact on the RGR, and there was no apparent trade-off in resource allocation between growth and defence. The current irradiance during leaf bud formation affected both the specific leaf area and leaf physiology upon transferring the plants from low to high light and vice versa. In summary, sun-grown plants fixed more carbon for growth and secondary metabolism, with the net effect of an increased RGR.
Life-cycle cost-benefit analysis of extensive vegetated roof systems.
Carter, Timothy; Keeler, Andrew
2008-05-01
The built environment has been a significant cause of environmental degradation in the previously undeveloped landscape. As public and private interest in restoring the environmental integrity of urban areas continues to increase, new construction practices are being developed that explicitly value beneficial environmental characteristics. The use of vegetation on a rooftop--commonly called a green roof--as an alternative to traditional roofing materials is an increasingly utilized example of such practices. The vegetation and growing media perform a number of functions that improve environmental performance, including: absorption of rainfall, reduction of roof temperatures, improvement in ambient air quality, and provision of urban habitat. A better accounting of the green roof's total costs and benefits to society and to the private sector will aid in the design of policy instruments and educational materials that affect individual decisions about green roof construction. This study uses data collected from an experimental green roof plot to develop a benefit cost analysis (BCA) for the life cycle of extensive (thin layer) green roof systems in an urban watershed. The results from this analysis are compared with a traditional roofing scenario. The net present value (NPV) of this type of green roof currently ranges from 10% to 14% more expensive than its conventional counterpart. A reduction of 20% in green roof construction cost would make the social NPV of the practice less than traditional roof NPV. Considering the positive social benefits and relatively novel nature of the practice, incentives encouraging the use of this practice in highly urbanized watersheds are strongly recommended.
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
1978-12-15
Utilization Review Procedures ................ 22 Reduced Philanthropy ......................... 22 Lack of Incentives ........................... 23 Reductions...challenges are made on hospitals in the form of status of technology, elite physician compliments, and increased specialization of labor which ccnstantly...construction are now marginally subsidized by philanthropy . Third party reimbursement is now the dominant source of hospital revenue with cost based formula
Specifications for the First CSP Building System.
ERIC Educational Resources Information Center
Detroit Public Schools, MI.
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
Evaluation of aggregate subgrade materials used as pavement subgrade/granular subbase.
DOT National Transportation Integrated Search
2015-07-01
With recent focus on sustainable construction practices and the ever-increasing transportation costs and scarcity of : natural resources, integration of large-size and marginally acceptable aggregates and recycled materials (e.g., : reclaimed asphalt...
Tracy, Sally K; Tracy, Mark B
2003-08-01
To estimate the cost of "the cascade" of obstetric interventions introduced during labour for low risk women. A cost formula derived from population data. New South Wales, Australia. All 171,157 women having a live baby during 1996 and 1997. Four groups of interventions that occur during labour were identified. A cost model was constructed using the known age-adjusted rates for low risk women having one of three birth outcomes following these pre-specified interventions. Costs were based on statewide averages for the cost of labour and birth in hospital. The outcome measure is an "average cost unit per woman" for low risk women, predicted by the level of intervention during labour. Obstetric care is classified as either private obstetric care in a private or public hospital, or routine public hospital care. The relative cost of birth increased by up to 50% for low risk primiparous women and up to 36% for low risk multiparous women as labour interventions accumulated. An epidural was associated with a sharp increase in cost of up to 32% for some primiparous low risk women, and up to 36% for some multiparous low risk women. Private obstetric care increased the overall relative cost by 9% for primiparous low risk women and 4% for multiparous low risk women. The initiation of a cascade of obstetric interventions during labour for low risk women is costly to the health system. Private obstetric care adds further to the cost of care for low risk women.
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
PHENIX Work Breakdown Structure. Cost and schedule review copy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
Satellite solar power - Will it pay off
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1977-01-01
A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
The effect of accountable care organizations on oncology practice.
Shulman, Lawrence N
2014-01-01
Cancer care accounts for a significant portion of the rise in health care costs, and therefore, as national efforts escalate to control cost, cancer care will be a focus of concern. Cost increases in cancer care are related to many factors, including increasing cancer incidence in an aging population, the introduction of new high-cost therapeutics, and the high cost of end-of-life care. Accountable care organizations (ACOs) have been one of the major efforts directed at controlling health care costs. How cancer care will fit into the rubric of ACOs is not entirely clear but will certainly evolve over the coming years. The oncology profession has the opportunity to play a role in this evolution or could leave the evolution to others driving the process, such as the Centers for Medicare and Medicaid Services (CMS), private payers, and ACOs. Ideally all parties will work together to provide a construct for high-value, high-quality care for patients with cancer while contributing to cost control in overall health care.
Hospitalization Cost Model of Pediatric Surgical Treatment of Chiari Type 1 Malformation.
Lam, Sandi K; Mayer, Rory R; Luerssen, Thomas G; Pan, I Wen
2016-12-01
To develop a cost model for hospitalization costs of surgery among children with Chiari malformation type 1 (CM-1) and to examine risk factors for increased costs. Data were extracted from the US National Healthcare Cost and Utilization Project 2009 Kids' Inpatient Database. The study cohort was comprised of patients aged 0-20 years who underwent CM-1 surgery. Patient charges were converted to costs by cost-to-charge ratios. Simple and multivariable generalized linear models were used to construct cost models and to determine factors associated with increased hospital costs of CM-1 surgery. A total of 1075 patients were included. Median age was 11 years (IQR 5-16 years). Payers included public (32.9%) and private (61.5%) insurers. Median wage-adjusted cost and length-of-stay for CM-1 surgery were US $13 598 (IQR $10 475-$18 266) and 3 days (IQR 3-4 days). Higher costs were found at freestanding children's hospitals: average incremental-increased cost (AIIC) was US $5155 (95% CI $2067-$8749). Factors most associated with increased hospitalization costs were patients with device-dependent complex chronic conditions (AIIC $20 617, 95% CI $13 721-$29 026) and medical complications (AIIC $13 632, 95% CI $7163-$21 845). Neurologic and neuromuscular, metabolic, gastrointestinal, and other congenital genetic defect complex chronic conditions were also associated with higher hospital costs. This study examined cost drivers for surgery for CM-1; the results may serve as a starting point in informing the development of financial risk models, such as bundled payments or prospective payment systems for these procedures. Beyond financial implications, the study identified specific risk factors associated with increased costs. Copyright © 2016 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.
Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli
2016-11-15
This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.
House Construction: How To Reduce Costs
Jerry O. Newman; Norman C. Teter; Constance D. O' Brien
1969-01-01
You're building a house and want to keep down the cost. How can you do it? First, plan carefully "on paper" before you start construction. By doing so, you can avoid costly mistakesinthebuildingandinthe purchase of materials. Careful planning and proper design will reduce not only the initial cost but also the cost of furnishings, utilities, and...
The Finnish experience to save asthma costs by improving care in 1987-2013.
Haahtela, Tari; Herse, Fredrik; Karjalainen, Jussi; Klaukka, Timo; Linna, Miika; Leskelä, Riikka-Leena; Selroos, Olof; Reissell, Eeva
2017-02-01
The Finnish National Asthma Program 1994-2004 markedly improved asthma care in the 1990s. We evaluated the changes in costs during 26 years from 1987 to 2013. Direct and indirect costs were calculated by using data from national registries. Costs from both the societal and patient perspectives were included. The costs were based on patients with persistent, physician-diagnosed asthma verified by lung function measurements. We constructed minimum and maximum scenarios to assess the effect of improved asthma care on total costs. The number of patients with persistent asthma in the national drug reimbursement register increased from 83,000 to 247,583. Improved asthma control reduced health care use and disability, resulting in major cost savings. Despite a 3-fold increase in patients, the total costs decreased by 14%, from €222 million to €191 million. Costs for medication and primary care visits increased, but overall annual costs per patient decreased by 72%, from €2656 to €749. The theoretical total cost savings for 2013, comparing actual with predicted costs, were between €120 and €475 million, depending on the scenario used. The Finnish Asthma Program resulted in significant cost savings at both the societal and patient levels during a 26-year period. Copyright © 2016 American Academy of Allergy, Asthma & Immunology. Published by Elsevier Inc. All rights reserved.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
Geophysical methods for road construction and maintenance
NASA Astrophysics Data System (ADS)
Rasul, Hedi; Karlson, Caroline; Jamali, Imran; Earon, Robert; Olofsson, Bo
2015-04-01
Infrastructure, such as road transportation, is a vital in civilized societies; which need to be constructed and maintained regularly. A large part of the project cost is attributed to subsurface conditions, where unsatisfactory conditions could increase either the geotechnical stabilization measures needed or the design cost itself. A way to collect information of the subsurface and existing installations which can lead to measures reducing the project cost and damage is to use geophysical methods during planning, construction and maintenance phases. The moisture in road layers is an important factor, which will affect the bearing capacity of the construction as well as the maintenances. Moisture in the road is a key factor for a well-functioning road. On the other hand the excessive moisture is the main reason of road failure and problems. From a hydrological point of view geophysical methods could help road planners identify the water table, geological strata, pollution arising from the road and the movement of the pollution before, during and after construction. Geophysical methods also allow road planners to collect valuable data for a large area without intrusive investigations such as with boreholes, i.e. minimizing the environmental stresses and costs. However, it is important to specify the investigation site and to choose the most appropriate geophysical method based on the site chosen and the objective of the investigation. Currently, numerous construction and rehabilitation projects are taking places around the world. Many of these projects are focused on infrastructural development, comprising both new projects and expansion of the existing infrastructural network. Geophysical methods can benefit these projects greatly during all phases. During the construction phase Ground Penetrating radar (GPR) is very useful in combination with Electrical Resistivity (ER) for detecting soil water content and base course compaction. However, ER and Electromagnetic (EM) methods can also be used for monitoring changes in water content and pollutant spreading during the maintenance phase. The objective of this study was to describe various geophysical methods which could benefit the road planning, construction and maintenance phases focusing on hydrological impacts.
24 CFR 578.47 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true New construction. 578.47 Section 578... construction. (a) Use. Grant funds may be used to: (1) Pay up to 100 percent of the cost of new construction... the floor area by 100 percent or more, and the cost of land associated with that construction, for use...
A synoptic view of golf course management
NASA Astrophysics Data System (ADS)
Katula, Robert L.
1996-03-01
The maintenance, construction, and redesign of private, public, and municipal golf courses in the United States is a multi-billion dollar industry. The entire golf course maintenance market, according to the National Golf Foundation, was 6.2 billion per year in 1991. The average maintenance cost in the United States was approximately 40,000 per hole per year for the over 15,000 golf courses in the United States in 1991. Golf course maintenance costs have risen 500 percent from 1971 to 1991. These costs are projected to continue to increase at a rate of 8 percent per year due to the demand for quality playing surfaces, increased use of non-potable water, and taxes on water and chemicals required to maintain turfgrass. The golf course construction and redesign market continues to maintain a rate of over 300 new golf courses and redesigned courses completed each year. The average construction costs run from 4 to 6 million and the average redesign costs 2 to 3 million per course. In order to create a perfectly maintained golf course, golf course managers may use as many as 25 different pesticides, fertilizers, and herbicides to control insects and turf disease. Further, turfgrass is often stressed to its limits when kept at the unnatural heights required to obtain firm and fast greens and fairways. The daily practice of living on the edge is often done with limited knowledge of changes taking place on the golf course, of the location of soil types and fertility, of surface and subsurface drainage, and of previous maintenance practices. There is a growing concern in the golf course industry that the concentration of chemicals and water required to maintain today's golf course may endanger ground water supplies for the surrounding ecosystem. This paper will describe the general methodology PTS used to develop a new management system for the maintenance, construction, and redesign of golf courses. The management system integrates remote sensing technology, geographic information systems analysis, and global positioning satellite survey capabilities to bring a total solution to bear on golf courses.
The prediction of engineering cost for green buildings based on information entropy
NASA Astrophysics Data System (ADS)
Liang, Guoqiang; Huang, Jinglian
2018-03-01
Green building is the developing trend in the world building industry. Additionally, construction costs are an essential consideration in building constructions. Therefore, it is necessary to investigate the problems of cost prediction in green building. On the basis of analyzing the cost of green building, this paper proposes the forecasting method of actual cost in green building based on information entropy and provides the forecasting working procedure. Using the probability density obtained from statistical data, such as labor costs, material costs, machinery costs, administration costs, profits, risk costs a unit project quotation and etc., situations can be predicted which lead to cost variations between budgeted cost and actual cost in constructions, through estimating the information entropy of budgeted cost and actual cost. The research results of this article have a practical significance in cost control of green building. Additionally, the method proposed in this article can be generalized and applied to a variety of other aspects in building management.
Research notes : recycled plastics in highway construction and maintenance.
DOT National Transportation Integrated Search
1994-04-01
The Oregon public and Oregon Legislature have great interests in the use of recycled waste products. The costs of waste disposal continue to increase as existing landfills approach maximum capacity forcing development of additional landfills. In resp...
Feasibility study of RFID technology for construction load tracking.
DOT National Transportation Integrated Search
2010-12-01
ADOT&PF is seeking more efficient business practices and processes to increase its speed in delivering supplies to work sites, optimize the workforce, and minimize : costs. The current tracking process uses a computer-generated ticket carried by the ...
50 CFR 253.11 - Guarantee policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...
Optimization of Production Lines and Cross-sections of Fiberglass Rebar
NASA Astrophysics Data System (ADS)
Maksimov, S. P.; Dildin, A. N.; Maksimova, A. E.
2017-11-01
The article substantiates the need of the construction industry in new lightweight and durable materials that ensure reduction in the cost of work and increase in the operational characteristics of the constructed facilities. These materials include fiberglass reinforcement which is an auxiliary bar made of heavy-duty glass fibers impregnated with a polymer adhesive composition and additionally entwined to create a ribbed surface and tight fit with fiberglass threads. This fitting has undeniable advantages in comparison with steel fittings. The polymer composite is resistant to corroding medium, does not corrode, does not conduct electricity, has high elastic properties, low thermal conductivity, increased tensile strength, etc. It is shown that the issues related to the improvement of technology and the form of a fiberglass rebar section are relevant for the construction industry. So, in particular, the presented developments will significantly reduce the consumption of adhesive composition for impregnating roving threads, reduce production costs by eliminating the loss of adhesive composition in impregnating vessels and pull-guide rollers, increasing the environmental friendliness of production and increasing the line productivity. In addition, it is possible to improve the strength characteristics by optimizing the cross-section and longitudinal cross-sections of the resulting fiberglass reinforcement. The presented changes in the design and technology of fiberglass reinforcement production can be realized as a separate independent module. It is easy to integrate into existing lines during repair work or routine maintenance of equipment.
Categorization of potential project cost overrun factors in construction industry
NASA Astrophysics Data System (ADS)
Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.
2018-04-01
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
Research on Risk Manage of Power Construction Project Based on Bayesian Network
NASA Astrophysics Data System (ADS)
Jia, Zhengyuan; Fan, Zhou; Li, Yong
With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.
Locally optimal transfer trajectories between libration point orbits using invariant manifolds
NASA Astrophysics Data System (ADS)
Davis, Kathryn E.
2009-12-01
Techniques from dynamical systems theory and primer vector theory have been applied to the construction of locally optimal transfer trajectories between libration point orbits. When two libration point orbits have different energies, it has been found that the unstable manifold of the first orbit can be connected to the stable manifold of the second orbit with a bridging trajectory. A bounding sphere centered on the secondary, with a radius less than the radius of the sphere of influence of the secondary, was used to study the stable and unstable manifold trajectories. It was numerically demonstrated that within the bounding sphere, the two-body parameters of the unstable and stable manifold trajectories could be analyzed to locate low transfer costs. It was shown that as the two-body parameters of an unstable manifold trajectory more closely matched the two-body parameters of a stable manifold trajectory, the total DeltaV necessary to complete the transfer decreased. Primer vector theory was successfully applied to a transfer to determine the optimal maneuvers required to create the bridging trajectory that connected the unstable manifold of the first orbit to the stable manifold of the second orbit. Transfer trajectories were constructed between halo orbits in the Sun-Earth and Earth-Moon three-body systems. Multiple solutions were found between the same initial and final orbits, where certain solutions retraced interior portions of the trajectory. All of the trajectories created satisfied the conditions for optimality. The costs of transfers constructed using invariant manifolds were compared to the costs of transfers constructed without the use of invariant manifolds, when data was available. In all cases, the total cost of the transfers were significantly lower when invariant manifolds were used in the transfer construction. In many cases, the transfers that employed invariant manifolds were three to four times more efficient, in terms of fuel expenditure, than the transfer that did not. The decrease in transfer cost was accompanied by an increase in transfer time of flight. Transfers constructed in the Earth-Moon system were shown to be particularly viable for lunar navigation and communication constellations, as excellent coverage of the lunar surface can be achieved during the transfer.
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing ofmore » the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor. 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense Efficient Hot Water Distribution requirement.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.; Loomis, H.
2014-09-01
The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing ofmore » the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor; 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense(R) Efficient Hot Water Distribution requirement.« less
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
HVAC Design Strategy for a Hot-Humid Production Builder, Houston, Texas (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
48 CFR 236.271 - Cost-plus-fixed-fee contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...
23 CFR 635.205 - Finding of cost effectiveness.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Finding of cost effectiveness. 635.205 Section 635.205... CONSTRUCTION AND MAINTENANCE Force Account Construction § 635.205 Finding of cost effectiveness. (a) It may be found cost effective for a State transportation department or county to undertake a federally financed...
A statistical analysis of the relationship between land values and freestanding bus facilities.
DOT National Transportation Integrated Search
2010-02-01
Public transit professionals continue to seek methods that offer greater service opportunities, while : not materially increasing the costs of service provision. One strategy is to construct bus transit : centers which operate much like the airline h...
Exploring the opportunities and barriers to intermodal rail freight.
DOT National Transportation Integrated Search
2014-04-01
Due to the effects of congestion and rising fuel costs, the need for green transportation and energy : security, and the increasing revenue gaps to finance highway infrastructure construction and renewal, : there is a critical need to explore the opp...
Standard cost elements for technology programs
NASA Technical Reports Server (NTRS)
Christensen, Carisa B.; Wagenfuehrer, Carl
1992-01-01
The suitable structure for an effective and accurate cost estimate for general purposes is discussed in the context of a NASA technology program. Cost elements are defined for research, management, and facility-construction portions of technology programs. Attention is given to the mechanisms for insuring the viability of spending programs, and the need for program managers is established for effecting timely fund disbursement. Formal, structures, and intuitive techniques are discussed for cost-estimate development, and cost-estimate defensibility can be improved with increased documentation. NASA policies for cash management are examined to demonstrate the importance of the ability to obligate funds and the ability to cost contracted funds. The NASA approach to consistent cost justification is set forth with a list of standard cost-element definitions. The cost elements reflect the three primary concerns of cost estimates: the identification of major assumptions, the specification of secondary analytic assumptions, and the status of program factors.
Safety cost management in construction companies: A proposal classification.
López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C
2016-06-16
Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardesty, C.H.; Shipper, E.S. Jr.
The cost of transporting coal is the most important aspect of the nation's failure to turn to coal and energy independence. The coal consumer is interested only in comparing the delivered costs of competitive sources of energy, and coal is frequently prohibitively high. The case for coal slurry pipelines and the need for federal legislation granting eminent domain and water rights is clear. The benefits to the public derive from increased use of domestic coal reserves at lower costs and from increased coal exports. Coal slurry pipelines will not be dependent upon federal largesse. While passage of legislation does notmore » guarantee construction, it will ensure that a genuine element of competition will be introduced. Without new legislation, slurry pipelines will remain ''pipe dreams.'' 108 references.« less
Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, Evan
2009-07-16
The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratorymore » has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.« less
Radiology Architecture Project Primer.
Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott
2017-12-19
The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents comparative data on college and university residence hall construction projects, including construction costs, size, numbers of students, and cost per square foot. Also provides comparative housing cost data over the past decade and identifies types of amenities being added to dormitories. (GR)
Costs and benefits of adapting to river floods at the global scale
NASA Astrophysics Data System (ADS)
Ward, Philip; Aerts, Jeroen; Botzen, Wouter; Hallegatte, Stephane; Jongman, Brenden; Kind, Jarl; Scussolini, Paolo; Winsemius, Hessel
2015-04-01
It is well known that the economic losses associated with flooding are huge; for example in 2012 alone the economic losses from flooding exceeded 19 billion. As a result, different models have been developed to assess global scale flood risk. Recently, these have been used in several studies to assess current flood risk at the global scale, and to project how risk may increase as a result of climate change and/or socioeconomic development. In most regions, these studies show rapid increases in risk into the future, and therefore call for urgent adaptation. However, to date no studies have attempted to assess the costs of carrying out such adaptation, nor the benefits. In this paper, we therefore present the first global scale estimate of the costs and benefits of adapting to increased river flood risk caused by factors such as climate change and socioeconomic development. For this study, we concentrate on structural adaptation measures, such as dikes, designed to prevent flood hazard up to a certain design standard. We address two questions: 1. What would be the costs and benefits of maintaining current flood protection standards, accounting for future climate and socioeconomic change until 2100? 2. What flood protection standards would be required by 2100 to keep future flood risk constant at today's levels? And what would be the costs and benefits associated with this? In this paper, we will present our first global estimates of the costs and benefits of adaptation to increased flood risk, as well as maps of these findings per country and river basin. We present the results under 4 emission scenarios (RCPs), 5 socioeconomic scenarios (SSPs), and under several assumptions relating to total potential flood damages, discount rates, construction costs, maintenance costs, and so forth. The research was carried out using the GLOFRIS modelling cascade. This global flood risk model calculates flood risk in terms of annual expected damage, and has been developed and validated over the past few years. For this study we have extended GLOFRIS by developing a module that calculates the costs and benefits of adaptation by increasing dike flood protection standards. In brief, this is carried out by calculating, per cell, the length of dikes that would be required to provide flood protection, multiplying this with the change in dike height that would be required to offer a certain flood protection standard, and multiplying this with data on the costs of dike construction and maintenance.
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
48 CFR 9904.417-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be added to the construction-in-progress account in recognition of the cost of money related to... should be added to the construction-in-progress account in recognition of the cost of money while under... the costs were incurred at a fairly uniform rate throughout the period. Because of the pattern of cost...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Specially Adapted Housing; Cost-of-Construction Index AGENCY: Department of Veterans Affairs. ACTION: Notice... SAH assistance annually based on a residential home cost-of-construction index. The Secretary uses the Turner Building Cost Index for this purpose. During the most recent calendar year for which the Turner...
Nursing home case-mix reimbursement in Mississippi and South Dakota.
Arling, Greg; Daneman, Barry
2002-04-01
To evaluate the effects of nursing home case-mix reimbursement on facility case mix and costs in Mississippi and South Dakota. Secondary data from resident assessments and Medicaid cost reports from 154 Mississippi and 107 South Dakota nursing facilities in 1992 and 1994, before and after implementation of new case-mix reimbursement systems. The study relied on a two-wave panel design to examine case mix (resident acuity) and direct care costs in 1-year periods before and after implementation of a nursing home case-mix reimbursement system. Cross-lagged regression models were used to assess change in case mix and costs between periods while taking into account facility characteristics. Facility-level measures were constructed from Medicaid cost reports and Minimum Data Set-Plus assessment records supplied by each state. Resident case mix was based on the RUG-III classification system. Facility case-mix scores and direct care costs increased significantly between periods in both states. Changes in facility costs and case mix were significantly related in a positive direction. Medicare utilization and the rate of hospitalizations from the nursing facility also increased significantly between periods, particularly in Mississippi. The case-mix reimbursement systems appeared to achieve their intended goals: improved access for heavy-care residents and increased direct care expenditures in facilities with higher acuity residents. However, increases in Medicare utilization may have influenced facility case mix or costs, and some facilities may have been unprepared to care for higher acuity residents, as indicated by increased rates of hospitalization.
Incorporation of recycled asphalt shingles in hot-mixed asphalt pavement mixtures.
DOT National Transportation Integrated Search
2010-03-01
Rises in construction and asphalt binder costs, as well as the growing pressures on landfills, have contributed to the : increased use of tear-off scrap shingles (TOSS) and manufacturer waste scrap shingles (MWSS) into hot-mixed : asphalt (HMA) pavem...
Applied approach slab settlement research, design/construction : final report.
DOT National Transportation Integrated Search
2013-08-01
Approach embankment settlement is a pervasive problem in Oklahoma and many other states. The bump and/or abrupt slope change poses a danger to traffic and can cause increased dynamic loads on the bridge. Frequent and costly maintenance may be needed ...
Changing the South African national antiretroviral therapy guidelines: The role of cost modelling
Johnson, Leigh F.; Pillay, Yogan; Blecher, Mark; Brennan, Alana T.; Long, Lawrence; Moultrie, Harry; Sanne, Ian; Fox, Matthew P.; Rosen, Sydney
2017-01-01
Background We were tasked by the South African Department of Health to assess the cost implications to the largest ART programme in the world of adopting sets of ART guidelines issued by the World Health Organization between 2010 and 2016. Methods Using data from large South African ART clinics (n = 24,244 patients), projections of patients in need of ART, and cost data from bottom-up cost analyses, we constructed a population-level health-state transition model with 6-monthly transitions between health states depending on patients’ age, CD4 cell count/ percentage, and, for adult first-line ART, time on treatment. Findings For each set of guidelines, the modelled increase in patient numbers as a result of prevalence and uptake was substantially more than the increase resulting from additional eligibility. Under each set of guidelines, the number of people on ART was projected to increase by 31–133% over the next seven years, and cost by 84–175%, while increased eligibility led to 1–26% more patients, and 1–17% higher cost. The projected increases in treatment cost due to the 2010 and the 2015 WHO guidelines could be offset in their entirety by the introduction of cost-saving measures such as opening the drug tenders for international competition and task-shifting. Under universal treatment, annual costs of the treatment programme will decrease for the first time from 2024 onwards. Conclusions Annual budgetary requirements for ART will continue to increase in South Africa until universal treatment is taken to full scale. Model results were instrumental in changing South African ART guidelines, more than tripling the population on treatment between 2009 and 2017, and reducing the per-patient cost of treatment by 64%. PMID:29084275
Ohsfeldt, Robert L.; Ward, Marcia M.; Schneider, John E.; Jaana, Mirou; Miller, Thomas R.; Lei, Yang; Wakefield, Douglas S.
2005-01-01
Objective The aim of this study was to estimate the costs of implementing computerized physician order entry (CPOE) systems in hospitals in a rural state and to evaluate the financial implications of statewide CPOE implementation. Methods A simulation model was constructed using estimates of initial and ongoing CPOE costs mapped onto all general hospitals in Iowa by bed quantity and current clinical information system (CIS) status. CPOE cost estimates were obtained from a leading CPOE vendor. Current CIS status was determined through mail survey of Iowa hospitals. Patient care revenue and operating cost data published by the Iowa Hospital Association were used to simulate the financial impact of CPOE adoption on hospitals. Results CPOE implementation would dramatically increase operating costs for rural and critical access hospitals in the absence of substantial costs savings associated with improved efficiency or improved patient safety. For urban and rural referral hospitals, the cost impact is less dramatic but still substantial. However, relatively modest benefits in the form of patient care cost savings or revenue enhancement would be sufficient to offset CPOE costs for these larger hospitals. Conclusion Implementation of CPOE in rural or critical access hospitals may depend on net increase in operating costs. Adoption of CPOE may be financially infeasible for these small hospitals in the absence of increases in hospital payments or ongoing subsidies from third parties. PMID:15492033
The Joint Confidence Level Paradox: A History of Denial
NASA Technical Reports Server (NTRS)
Butts, Glenn; Linton, Kent
2009-01-01
This paper is intended to provide a reliable methodology for those tasked with generating price tags on construction (C0F) and research and development (R&D) activities in the NASA performance world. This document consists of a collection of cost-related engineering detail and project fulfillment information from early agency days to the present. Accurate historical detail is the first place to start when determining improved methodologies for future cost and schedule estimating. This paper contains a beneficial proposed cost estimating method for arriving at more reliable numbers for future submits. When comparing current cost and schedule methods with earlier cost and schedule approaches, it became apparent that NASA's organizational performance paradigm has morphed. Mission fulfillment speed has slowed and cost calculating factors have increased in 21st Century space exploration.
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
NASA Technical Reports Server (NTRS)
Willis, P. B.; Baum, B.; White, R. A.
1978-01-01
The results of an investigation of solar module encapsulation systems applicable to the Low-Cost Solar Array Project 1986 cost and performance goals are presented. Six basic construction elements were identified and their specific uses in module construction defined. A uniform coating basis was established for each element. The survey results were also useful in revealing price ranges for classes of materials and estimating the cost allocation for each element within the encapsulating cost goal. The six construction elements were considered to be substrates, superstrates, pottants, adhesives, outer covers and back covers.
Workers' compensation costs among construction workers: a robust regression analysis.
Friedman, Lee S; Forst, Linda S
2009-11-01
Workers' compensation data are an important source for evaluating costs associated with construction injuries. We describe the characteristics of injured construction workers filing claims in Illinois between 2000 and 2005 and the factors associated with compensation costs using a robust regression model. In the final multivariable model, the cumulative percent temporary and permanent disability-measures of severity of injury-explained 38.7% of the variance of cost. Attorney costs explained only 0.3% of the variance of the dependent variable. The model used in this study clearly indicated that percent disability was the most important determinant of cost, although the method and uniformity of percent impairment allocation could be better elucidated. There is a need to integrate analytical methods that are suitable for skewed data when analyzing claim costs.
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Budiman, Rachmat; Riswanto
2017-06-01
Building has a big impact on the environmental developments. There are three general motives in building, namely the economy, society, and environment. Total completed building construction in Indonesia increased by 116% during 2009 to 2011. It made the energy consumption increased by 11% within the last three years. In fact, 70% of energy consumption is used for electricity needs on commercial buildings which leads to an increase of greenhouse gas emissions by 25%. Green Building cycle costs is known as highly building upfront cost in Indonesia. The purpose of optimization in this research improves building performance with some of green concept alternatives. Research methodology is mixed method of qualitative and quantitative approaches through questionnaire surveys and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment Method. Choosing optimization results were based on the largest efficiency of building life cycle and the most effective cost to refund.
Too expensive to meter: the influence of transaction costs in transportation and communication.
Levinson, David; Odlyzko, Andrew
2008-06-13
Technology appears to be making fine-scale charging (as in tolls on roads that depend on time of day or even on current and anticipated levels of congestion) increasingly feasible. Such charging also appears to be increasingly desirable, as traffic on roads continues to grow and costs and public opposition limit new construction. Similar incentives towards fine-scale charging also appear to be operating in communications and other areas, such as electricity usage. Standard economic theory supports such measures and technology is being developed and deployed to implement them. But their spread is not very rapid and their prospects for the future are uncertain. This paper presents a collection of sketches, ranging from ancient history to very recent developments, that illustrate the costs that charging imposes. Some of those costs are explicit (in terms of the monetary costs to users and the costs of implementing the charging mechanisms). Others are implicit, such as the time or the mental processing costs of users. These argue that the case for fine-scale charging is not unambiguous and that in many cases such charging may lead to undesirable outcomes.
Factors affecting economies of scale in combined sewer systems.
Maurer, Max; Wolfram, Martin; Anja, Herlyn
2010-01-01
A generic model is introduced that represents the combined sewer infrastructure of a settlement quantitatively. A catchment area module first calculates the length and size distribution of the required sewer pipes on the basis of rain patterns, housing densities and area size. These results are fed into the sewer-cost module in order to estimate the combined sewer costs of the entire catchment area. A detailed analysis of the relevant input parameters for Swiss settlements is used to identify the influence of size on costs. The simulation results confirm that an economy of scale exists for combined sewer systems. This is the result of two main opposing cost factors: (i) increased construction costs for larger sewer systems due to larger pipes and increased rain runoff in larger settlements, and (ii) lower costs due to higher population and building densities in larger towns. In Switzerland, the more or less organically grown settlement structures and limited land availability emphasise the second factor to show an apparent economy of scale. This modelling approach proved to be a powerful tool for understanding the underlying factors affecting the cost structure for water infrastructures.
A Semantics-Based Approach to Construction Cost Estimating
ERIC Educational Resources Information Center
Niknam, Mehrdad
2015-01-01
A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…
Evaluating the causes of photovoltaics cost reduction: Why is PV different?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trancik, Jessika; McNerney, James; Kavlak, Goksin
The goals of this project were to quantify sources of cost reduction in photovoltaics (PV), improve theories of technological evolution, develop new analytical methods, and formu- late guidelines for continued cost reduction in photovoltaics. A number of explanations have been suggested for why photovoltaics have come down in cost rapidly over time, including increased production rates, significant R&D expenditures, heavy patenting ac- tivity, decreasing material and input costs, scale economies, reduced plant construction costs, and higher conversion efficiencies. We classified these proposed causes into low- level factors and high-level drivers. Low-level factors include technical characteristics, such as module efficiency ormore » wafer area, which are easily posed in terms of variables of a cost equation. High-level factors include scale economies, research and development (R&D), and learning-by-doing.« less
Cost segregation of assets offers tax benefits.
Grant, D A
2001-04-01
A cost-segregation study is an asset-reclassification strategy that accelerates tax-depreciation deductions. By using this strategy, healthcare facility owners can lower their current income-tax liability and increase current cash flow. Simply put, certain real estate is reclassified from long-lived real property to shorter-lived personal property for depreciation purposes. Depreciation deductions for the personal property then can be greatly accelerated, thereby producing greater present-value tax savings. An analysis of costs can be conducted from either detailed construction records, when such records are available, or by using qualified appraisers, architects, or engineers to perform the allocation analysis.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sale which includes specified road construction with total estimated construction costs of $50,000 or more, the advertisement shall also include: (1) The total estimated construction cost of the permanent roads. (2) A statement extending to small business concerns qualified for preferential bidding on timber...
Do We Really Know how Much it Costs to Construct High Performance Buildings?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Livingston, Olga V.; Dillon, Heather E.; Halverson, Mark A.
2012-08-31
Understanding the cost of energy efficient construction is critical to decision makers in building design, code development, and energy analysis. How much does it cost to upgrade from R-13 to R-19 in a building wall? How much do low-e windows really cost? Can we put a dollar figure on commissioning? Answers to these questions have a fuzzy nature, based on educated guesses and industry lore. The response depends on location, perspective, bulk buying, and hand waving. This paper explores the development of a web tool intended to serve as a publicly available repository of building component costs. In 2011 themore » U.S. Department of Energy (DOE) funded the launch of a web tool called the Building Component Cost Community (BC3), dedicated to publishing building component costs from documented sources, actively gathering verifiable cost data from the users, and collecting feedback from a wide range of participants on the quality of the posted cost data. The updated BC3 database, available at http://bc3.pnnl.gov, went live on April 30, 2012. BC3 serves as the ultimate source of the energy-related component costs for DOE’s residential code development activities, including cost-effectiveness analyses. The paper discusses BC3 objectives, structure, functionality and the current content of the database. It aims to facilitate a dialog about the lack of verifiable transparent cost data, as well as introduce a web tool that helps to address the problem. The questions posed above will also be addressed by this paper, but they have to be resolved by the user community by providing feedback and cost data to the BC3 database, thus increasing transparency and removing information asymmetry.« less
The Effect of Entrepreneurial Orientation on Teacher Satisfaction and Retention
ERIC Educational Resources Information Center
Thibault, Melissa Rihm
2016-01-01
Teacher turnover is a costly problem. Since teacher working conditions influence teacher's satisfaction and career intentions, managers may theoretically increase teacher satisfaction and retention by fostering a school environment supportive of the highly-trained professional. Entrepreneurial Orientation is an organizational construct correlated…
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2012-03-02
challenging ship redesign as well as a new power and cooling architecture coupled with the challenges to construct such a dense ship, will make...costs. Our prior work has shown that construction of lead ships is challenging , the risk of cost growth is high, and having sufficient construction...not include a thorough trade-off analysis that would compare the relative costs and benefits of different solutions under consideration or provide
NASA Technical Reports Server (NTRS)
1977-01-01
Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Increasing Coverage of Appropriate Vaccinations
Jacob, Verughese; Chattopadhyay, Sajal K.; Hopkins, David P.; Morgan, Jennifer Murphy; Pitan, Adesola A.; Clymer, John
2016-01-01
Context Population-level coverage for immunization against many vaccine-preventable diseases remains below optimal rates in the U.S. The Community Preventive Services Task Force recently recommended several interventions to increase vaccination coverage based on systematic reviews of the evaluation literature. The present study provides the economic results from those reviews. Evidence acquisition A systematic review was conducted (search period, January 1980 through February 2012) to identify economic evaluations of 12 interventions recommended by the Task Force. Evidence was drawn from included studies; estimates were constructed for the population reach of each strategy, cost of implementation, and cost per additional vaccinated person because of the intervention. Analyses were conducted in 2014. Evidence synthesis Reminder systems, whether for clients or providers, were among the lowest-cost strategies to implement and the most cost effective in terms of additional people vaccinated. Strategies involving home visits and combination strategies in community settings were both costly and less cost effective. Strategies based in settings such as schools and managed care organizations that reached the target population achieved additional vaccinations in the middle range of cost effectiveness. Conclusions The interventions recommended by the Task Force differed in reach, cost, and cost effectiveness. This systematic review presents the economic information for 12 effective strategies to increase vaccination coverage that can guide implementers in their choice of interventions to fit their local needs, available resources, and budget. PMID:26847663
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
NASA Astrophysics Data System (ADS)
Reger, Darren; Madanat, Samer; Horvath, Arpad
2014-10-01
As road conditions worsen, users experience an increase in fuel consumption and vehicle wear and tear. This increases the costs incurred by the drivers, and also increases the amount of greenhouse gases (GHGs) that vehicles emit. Pavement condition can be improved through rehabilitation activities (resurfacing) to reduce the effects on users, but these activities also have significant cost and GHG emission impacts. The objective of pavement management is to minimize total societal (user and agency) costs. However, the environmental impacts associated with the cost-minimizing policy are not currently accounted for. We show that there exists a range of potentially optimal decisions, known as the Pareto frontier, in which it is not possible to decrease total emissions without increasing total costs and vice versa. This research explores these tradeoffs for a system of pavement segments. For a case study, a network was created from a subset of California’s highways using available traffic data. It was shown that the current resurfacing strategy used by the state’s transportation agency, Caltrans, does not fall on the Pareto frontier, meaning that significant savings in both total costs and total emissions can be achieved by switching to one of the optimal policies. The methods presented in this paper also allow the decision maker to evaluate the impact of other policies, such as reduced vehicle kilometers traveled or better construction standards.
Wilburn, David R.; Goonan, Thomas G.
1998-01-01
Increased amounts of recycled materials are being used to supplement natural aggregates (derived from crushed stone, sand and gravel) in road construction. An understanding of the economics and factors affecting the level of aggregates recycling is useful in estimating the potential for recycling and in assessing the total supply picture of aggregates. This investigation includes a descriptive analysis of the supply sources, technology, costs, incentives, deterrents, and market relationships associated with the production of aggregates.
NASA Astrophysics Data System (ADS)
Smirnov, Vitaly; Dashkov, Leonid; Gorshkov, Roman; Burova, Olga; Romanova, Alina
2018-03-01
The article presents the analysis of the methodological approaches to cost estimation and determination of the capitalization level of high-rise construction objects. Factors determining the value of real estate were considered, three main approaches for estimating the value of real estate objects are given. The main methods of capitalization estimation were analyzed, the most reasonable method for determining the level of capitalization of high-rise buildings was proposed. In order to increase the value of real estate objects, the author proposes measures that enable to increase significantly the capitalization of the enterprise through more efficient use of intangible assets and goodwill.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, K.M.
1983-07-01
The number of workers currently involved in the various aspects of geothermal development in the Geysers are identified. Using two different development scenarios, projections are made for the number of power plants needed to reach the electrical generation capacity of the steam resource in the Geysers. The report also projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power plants. Although the number of construction workers fluctuates, most are not likely to become new, permanent residents of the KGRA counties. The administrative and public service costs of geothermal development tomore » local jurisdications are examined, and these costs are compared to geothermal revenues accruing to the local governments. Revenues do not cover the immediate fiscal needs resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several mitigation options are discussed and a framework presented for calculating mitigation costs for school and road impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, P.F.; Kennedy, E.L.; McCormack, R.G.
1992-09-01
The sensitivity of modern electronic equipment has increased the need for costly electromagnetic shielding. To reduce this cost, the U.S. Army Construction Engineering Research Laboratories (USACERL) has developed a new concept for shielding design that uses 28-gauge galvanized steel and standard galvanized nails. In this study, an electromagnetically shielded structure using the concept was designed, built, and evaluated for shielding effectiveness. The galvanized material was mounted to the standard USACERL test aperture and nailed to the wooden module frame, and the shielding effectiveness of the new construction design was measured using radio frequency antennas and receivers. Evaluations showed that themore » nail-together structure proved adequate for many shielding applications. However, while the galvanized steel met most shielding application requirements, this process added multiple seams to the structure, which decreased shielding in many instances by as much as 40 dB. Electromagnetic shielding, Electromagnetic pulse C3I Facilities.« less
Bending the urban flow: a construction-migration strategy.
Shaw, R P
1980-01-01
The excess rate of migration to urban centers is a problem affecting over 50 developing countries and 18 developed ones (68% of the world's population). Policies that rely on compulsion or disincentives have mostly failed because they do not deal with the cause of the problem. This paper proposes a strategy of increasing or decreasing the rate of housing construction in different urban areas as a means of stimulating or reducing migration to those areas; in most developing areas priority is given to residential construction in already congested metropolitan areas. 5 assumptions are the basis for this approach: 1) migrants tend to gravitate to the most powerful growth poles; 2) residential construction is a leading sector of regional and urban economies; 3) the encouragement of construction activity will make itself felt indirectly via its effect on construction-related employment; 4) rates of residential construction may be manipulated through government policy affecting the cost of materials, availability of loans, level of unionization, and price of housing; and 5) residential construction is amenable to quick policy action. The central idea of the strategy is that an increase in residential construction will exercise a pull on migrants, increasing job opportunities, raising incomes, lowering housing costs, and improving the chances of home ownership. This idea has been verified by various projects in Hong Kong, Ghana, Venezuela, Brazil, Bahrain, Mexico, Colombia, Poland, USSR, and the UK. In Bahrain low-income housing programs have been used to relocate Bahraini nationals in new outlying suburbs and to promote population growth in rural villages. In Mexico self-help and low-income housing programs have helped to redirect migrants headed for small towns toward smaller communities. There is also evidence to show that building construction has the potential to expand and contribute to economic growth. Some problems of implementation might be finding an adequate economic base, the need to place new communities close to primate cities, the use of large portions of the national budget, and profit-maximizing plans have been detrimental to the speed and development of construction migration. Some benefits for smaller urban areas of construction migrants in developing countries are: 1) emphasis on the development of a labor-intensive industry, 2) little training of workers as needed, 3) it can provide the housing required by industries planning to move to smaller areas, 4) this housing will be cheaper, and 5) incentives will exist to save and invest in the smaller areas.
NASA Astrophysics Data System (ADS)
Yamasaki, Hayata; Soeda, Akihito; Murao, Mio
2017-09-01
We introduce and analyze graph-associated entanglement cost, a generalization of the entanglement cost of quantum states to multipartite settings. We identify a necessary and sufficient condition for any multipartite entangled state to be constructible when quantum communication between the multiple parties is restricted to a quantum network represented by a tree. The condition for exact state construction is expressed in terms of the Schmidt ranks of the state defined with respect to edges of the tree. We also study approximate state construction and provide a second-order asymptotic analysis.
Direct procurement of wound management products.
Jenkins, Trevor
2014-03-01
This article describes a collaborative project between Bedfordshire Community Health Services and Primary Care Trusts/Clinical Commissioning Groups to improve provision of dressings to nurses for the patients they treat. Commissioners have facilitated a transformational approach and encouraged development of efficient systems of increased cost-effectiveness rather than a transactional approach based on opportunistic cost improvement plans. Reconfiguration to direct procurement from GP prescribing has reduced wastage, released nurse time from processes to spend on clinical contact time with patients, increased efficiency, and reduced prescription workload for GPs, all without adverse effects on expenditure. Establishing a wound care products formulary placed control under the nurses treating patients and facilitated decision-making based on cost-effectiveness in clinical use. Nurses now manage 60% of expenditure in the local community health economy, and this is increasing. Relationships with the dressings manufacturing industry have also changed in a positive, constructive direction.
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information
Use Hardwoods for Building Components
Glenn A. Cooper; William W. Rice
1968-01-01
Describes a system for prefabricating structural units from hardwoods for use in floors, roofs, and walls of a-frame or post-and-beam type construction. The interior face of the unit is decorative paneling; the exterior face is sheathing. Use of the system could reduce prefabricated house construction costs compared to conventional construction costs.
Preservation treatment for wood bridge application
Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf
2009-01-01
Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...
Cost viability of 3D printed house in UK
NASA Astrophysics Data System (ADS)
Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.
2018-03-01
UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
44 CFR 209.10 - Project implementation requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...
NASA Technical Reports Server (NTRS)
Kuiper, T. B. H.; Resch, G. M.
2000-01-01
The increasing load on NASA's deep Space Network, the new capabilities for deep space missions inherent in a next-generation radio telescope, and the potential of new telescope technology for reducing construction and operation costs suggest a natural marriage between radio astronomy and deep space telecommunications in developing advanced radio telescope concepts.
NASA Astrophysics Data System (ADS)
Graboski, A. J.
2016-12-01
The Department of Defense (DoD) is planning over $600M in military construction on Eielson Air Force Base (AFB) within the next three fiscal years. Although many studies have been conducted on permafrost and climate change, the future of our climate as well as any impacts on arctic infrastructure, remains unclear. This research focused on future climate predictions to determine likely scenarios for the United States Air Force's Strategic Planners to consider. This research also looked at various construction methods being used by industry to glean best practices to incorporate into future construction in order to determine cost factors to consider when permafrost soils may be encountered. The most recent 2013 International Panel on Climate Change (IPCC) report predicts a 2.2ºC to 7.8ºC temperature rise in Arctic regions by the end of the 21st Century in the Representative Concentration Pathways, (RCP4.5) emissions scenario. A regression model was created using archived surface observations from 1944 to 2016. Initial analysis using regression/forecast techniques show a 1.17ºC temperature increase in the Arctic by the end of the 21st Century. Historical DoD construction data was then used to determine an appropriate cost factor. Applying statistical tests to the adjusted climate predictions supports continued usage of current DoD cost factors of 2.13 at Eielson and 2.97 at Thule AFBs as they should be sufficient when planning future construction projects in permafrost rich areas. These cost factors should allow planners the necessary funds to plan foundation mitigation techniques and prevent further degradation of permafrost soils around airbase infrastructure. This current research focused on Central Alaska while further research is recommended on the Alaskan North Slope and Greenland to determine climate change impacts on critical DoD infrastructure.
Solar pond power plant feasibility study for Davis, California
NASA Technical Reports Server (NTRS)
Wu, Y. C.; Singer, M. J.; Marsh, H. E.; Harris, J.; Walton, A. L.
1982-01-01
The feasibility of constructing a solar pond power plant at Davis, California was studied. Site visits, weather data compilation, soil and water analyses, conceptual system design and analyses, a material and equipment market survey, conceptual site layout, and a preliminary cost estimate were studied. It was concluded that a solar pond power plant is technically feasible, but economically unattractive. The relatively small scale of the proposed plant and the high cost of importing salt resulted in a disproportionately high capital investment with respect to the annual energy production capacity of the plant. Cycle optimization and increased plant size would increase the economical attractiveness of the proposed concept.
McFarland, Sam G
2005-03-01
In the week before the 2003 American attack on Iraq, the effects of authoritarianism and the social dominance orientation on support for the attack were examined. Based on prior research on the nature of these constructs, a structural model was developed and tested. As predicted, authoritarianism strengthened support for the attack by intensifying the perception that Iraq threatened America. Social dominance increased support by reducing concern for the likely human costs of the war. Both also increased blind patriotism, which in turn reduced concern for the war's human costs and was reciprocally related to the belief that Iraq threatened America.
Early versus late parenteral nutrition in ICU patients: cost analysis of the EPaNIC trial
2012-01-01
Introduction The EPaNIC randomized controlled multicentre trial showed that postponing initiation of parenteral nutrition (PN) in ICU-patients to beyond the first week (Late-PN) enhanced recovery, as compared with Early-PN. This was mediated by fewer infections, accelerated recovery from organ failure and reduced duration of hospitalization. Now, the trial's preplanned cost analysis (N = 4640) from the Belgian healthcare payers' perspective is reported. Methods Cost data were retrieved from individual patient invoices. Undiscounted total healthcare costs were calculated for the index hospital stay. A cost tree based on acquisition of new infections and on prolonged length-of-stay was constructed. Contribution of 8 cost categories to total hospitalization costs was analyzed. The origin of drug costs was clarified in detail through the Anatomical Therapeutic Chemical (ATC) classification system. The potential impact of Early-PN on total hospitalization costs in other healthcare systems was explored in a sensitivity analysis. Results ICU-patients developing new infection (24.4%) were responsible for 42.7% of total costs, while ICU-patients staying beyond one week (24.3%) accounted for 43.3% of total costs. Pharmacy-related costs represented 30% of total hospitalization costs and were increased by Early-PN (+608.00 EUR/patient, p = 0.01). Notably, costs for ATC-J (anti-infective agents) (+227.00 EUR/patient, p = 0.02) and ATC-B (comprising PN) (+220.00 EUR/patient, p = 0.006) drugs were increased by Early-PN. Sensitivity analysis revealed a mean total cost increase of 1,210.00 EUR/patient (p = 0.02) by Early-PN, when incorporating the full PN costs. Conclusions The increased costs by Early-PN were mainly pharmacy-related and explained by higher expenditures for PN and anti-infective agents. The use of Early-PN in critically ill patients can thus not be recommended for both clinical (no benefit) and cost-related reasons. Trial registration ClinicalTrials.gov NCT00512122. PMID:22632574
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
Illumina Unamplified Indexed Library Construction: An Automated Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang
Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.
ERIC Educational Resources Information Center
Kreider, Beth
1997-01-01
Discusses the benefits of dome architecture for a community's middle- and high-school multi-purpose facility. The dome construction is revealed as being cost effective in construction and in maintenance and energy costs. (GR)
Shell Structure Water Cellar’s Rapid Construct Technology
NASA Astrophysics Data System (ADS)
Xian Zhuang, Wen; Qing Yin, De; Chen, Shu Fa
2018-05-01
Tradition concrete water cellar’s problems, such as high cost, long construction term, easy to crack, are pointed out. A new construct method, and it’s matching airbag mould, of constructing concrete shell structure water cellars, are introduced. Combine with full-scale verifying cellar’s construct test, full-load water storage test, analyzed the technology in terms of construction term, cost, crack resistance, air bag pressure etc. It is believed that this new technology can successfully solve the problems that tradition technology has, and it will have a good prospect in rainfall resources utilization.
Characteristics of worker accidents on NYSDOT construction projects.
Mohan, Satish; Zech, Wesley C
2005-01-01
This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.
Methane digester for wastewater grown aquatic plants. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-01-01
The purpose of this project was to build and test a small-scale, prototype anaerobic digester using wastewater grown aquatic plants as feed stock. Two 150 gal. digesters of the horizontal ''bag'' shape were constructed and fed with water hyacinths and duckweed plants grown on wastewater. Bio-films were added to increase methane bacteria surface attachment area, and solar heating was used to increase operating temperatures. Repeated difficulties were encountered with the low cost materials and construction techniques used, causing leaks of liquids and methane gas, and in the solar heat exchanger. As a consequence, no reliable data were obtained on performance.more » Due to an inadequate budget, the project was terminated without making construction changes needed to properly operate the system for a long period of time. 15 refs., 7 figs.« less
Long-term purification efficiency of a wetland constructed to treat runoff from peat extraction.
Karjalainen, Satu M; Heikkinen, Kaisa; Ihme, Raimo; Kløve, Bjørn
2016-01-01
Peat extraction increases the phosphorus, nitrogen, organic matter, suspended solids, and iron concentrations in runoff, resulting in negative effects on downstream water bodies. Wetlands are commonly used as natural cost-effective solutions to mitigate these negative effects. This study analyzed changes in the quality of runoff water from peat extraction areas and the long-term efficiency of constructed wetlands. The results indicate that the quality of runoff water changed after the initial drainage and during peat extraction. Nitrogen leached at high concentrations in the early stages of peat extraction following drainage, whereas the leaching of iron and phosphorus increased after peat extraction from deeper layers. Comparison of water quality and impurities retained immediately after treatment wetland construction and 14 years later showed that the treatment wetland remained functional, with good retention capacity, over a long period.
[Diagnostics of work motivation (DIAMO): optimization and construct validity].
Ranft, Andreas; Fiedler, Rolf; Greitemann, Bernhard; Heuft, Gereon
2009-01-01
Faced with increasing cost pressure of the social insurance system the carriers of rehabilitation programs focus on the efficacy of their measures. The diagnostic instrument for work motivation (DIAMO) has been developed to assess the influence of job-related motivation on the rehabilitation outcome. The inner structure of the instrument was validated and optimized in a cohort of medical rehabilitation patients (n = 422). Construct validity was further tested by using established instruments. Ten scales related to self-image, intention of action and goodness of fit show good psychometric qualities (Cronbachs alpha: 0.72 - 0.86). The constructs correlate moderately-to-strongly with personality-oriented scales while correlation with disease-related contents is low. The DIAMO is a generic and not disease oriented instrument. It would be expected to facilitate the development of vocational interventions to increase the rehabilitation outcome.
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2011 CFR
2011-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Brauer, David G; Hawkins, William G; Strasberg, Steven M; Brunt, L Michael; Jaques, David P; Mercurio, Nicholas R; Hall, Bruce L; Fields, Ryan C
2015-12-01
Payers and regulatory bodies are increasingly placing emphasis on cost containment, quality/outcome measurement and transparent reporting. Significant cost variation occurs in many operative procedures without a clear relationship with outcomes. Clear cost-benefit associations will be necessary to justify expenditures in the era of bundled payment structures. All laparoscopic cholecystectomies (LCCKs) performed within a single health system over a 1-year period were analysed for operating room (OR) supply cost. The cost was correlated with American College of Surgeons National Surgical Quality Improvement Program (ACS NSQIP) outcomes. From July 2013 to June 2014, 2178 LCCKs were performed by 55 surgeons at seven hospitals. The median case OR supply cost was $513 ± 156. There was variation in cost between individual surgeons and within an individual surgeon's practice. There was no correlation between cost and ACS NSQIP outcomes. The majority of cost variation was explained by selection of trocar and clip applier constructs. Significant case OR cost variation is present in LCCK across a single health system, and there is no clear association between increased cost and NSQIP outcomes. Placed within the larger context of overall cost, the opportunity exists for improved resource utilization with no obvious risk for a reduction in the quality of care. © 2015 International Hepato-Pancreato-Biliary Association.
Brauer, David G; Hawkins, William G; Strasberg, Steven M; Brunt, L Michael; Jaques, David P; Mercurio, Nicholas R; Hall, Bruce L; Fields, Ryan C
2015-01-01
Background Payers and regulatory bodies are increasingly placing emphasis on cost containment, quality/outcome measurement and transparent reporting. Significant cost variation occurs in many operative procedures without a clear relationship with outcomes. Clear cost-benefit associations will be necessary to justify expenditures in the era of bundled payment structures. Methods All laparoscopic cholecystectomies (LCCKs) performed within a single health system over a 1-year period were analysed for operating room (OR) supply cost. The cost was correlated with American College of Surgeons National Surgical Quality Improvement Program (ACS NSQIP) outcomes. Results From July 2013 to June 2014, 2178 LCCKs were performed by 55 surgeons at seven hospitals. The median case OR supply cost was $513 ± 156. There was variation in cost between individual surgeons and within an individual surgeon's practice. There was no correlation between cost and ACS NSQIP outcomes. The majority of cost variation was explained by selection of trocar and clip applier constructs. Conclusions Significant case OR cost variation is present in LCCK across a single health system, and there is no clear association between increased cost and NSQIP outcomes. Placed within the larger context of overall cost, the opportunity exists for improved resource utilization with no obvious risk for a reduction in the quality of care. PMID:26345351
Can an economist find happiness setting public utility rates
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kahn, A.E.
Alfred E. Kahn describes his applications of economic theories to rate level regulatory policies during his career as a public utilities regulator. Two shifts in regulatory thinking have responded to the intent to have rates set to reflect rising costs that will be occuring while the rates are in effect rather than on past costs and have recognized that varying the allowable rate of return can be as effective as changing the rate base. Pressures have been exerted on economists to place too much emphasis on regulatory lag, full-cost pricing, sunk cost, and other factors affecting capital formation. A rationalmore » policy recognizes differences between the needs of individual companies to raise capital and the variations that occur during a given accounting period. Rates based on trends that recognize returns over a time span is one solution. Anticipated cost increases have been included in rate levels so that automatic cost adjustments can be made during times of inflation. Because of increases in the marginal cost of capital, regulators must decide how to selectively vary cash flow during construction periods in a way that will give adequate signals to consumers. Situations in which a water company is associated with a real estate developer can avoid a double recovery of investment by granting rate increases in relation to cost over time.« less
1994-06-07
023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to
NASA Astrophysics Data System (ADS)
González, M.; Montaño, M.; Hoyo, C.
2017-01-01
We have constructed a low cost fluorescence detector model to determine the presence of some heavy metals in an aqueous medium. In particular, we focus on metals which cause public health problems in our country. We did the first tests with standard samples of Hg (II). The innovative features of this instrument are its small dimensions (9 dm3) and the low cost of materials used in its construction.
Review of coal bottom ash and coconut shell in the production of concrete
NASA Astrophysics Data System (ADS)
Faisal, S. K.; Mazenan, P. N.; Shahidan, S.; Irwan, J. M.
2018-04-01
Concrete is the main construction material in the worldwide construction industry. High demand of sand in the concrete production have been increased which become the problems in industry. Natural sand is the most common material used in the construction industry as natural fine aggregate and it caused the availability of good quality of natural sand keep decreasing. The need for a sustainable and green construction building material is required in the construction industry. Hence, this paper presents utilization of coal bottom ash and coconut shell as partial sand replacement in production of concrete. It is able to save cost and energy other than protecting the environment. In summary, 30% usage of coal bottom ash and 25% replacement of coconut shell as aggregate replacement show the acceptable and satisfactory strength of concrete.
External risk factors affecting construction costs
NASA Astrophysics Data System (ADS)
Mubarak, Husin, Saiful; Oktaviati, Mutia
2017-11-01
Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
ERIC Educational Resources Information Center
Gutter, Rachel; Knupp, Emily
2011-01-01
Green design, green construction, and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School in…
ERIC Educational Resources Information Center
Gutter, Rachel; Knupp, Emily
2010-01-01
Green design, green construction and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School can be…
Evaluation of cost benefits to the SCDOT with increased RAP-RAS usage : final report.
DOT National Transportation Integrated Search
2014-12-01
Over 90% of U.S. highways and roads are constructed with hot mix asphalt (HMA) and as this : infrastructure ages, these highways and roads must be maintained and rehabilitated. The 1970s marked : the beginning of the widespread use of reclaimed aspha...
CONVERTING ENERGY FROM RECLAIMED HEAT: THERMAL ELECTRIC GENERATOR
The use of solar energy acquiring devices has been slow to gain acceptance due to their overall low power generation versus high cost of a solar system. The goal of this project is to construct a model which increases the overall power generation of a solar building system by...
ERIC Educational Resources Information Center
Hall, Julie
2008-01-01
In today's economic climate, Americans must find creative ways to do more with less. School and university administrators are challenged with stretching budgets to compensate for the increased costs of construction, maintenance and operations. Furniture is a tempting place to save money. It is one of the last things put in place in a construction…
Reentry Planning for Mentally Disordered Inmates: A Social Investment Perspective
ERIC Educational Resources Information Center
Wolff, Nancy; Bjerklie, J. R.; Maschi, Tina
2005-01-01
Correctional facilities are under increasing pressure to respond to the treatment needs of mentally disordered offenders during their incarceration and to arrange for treatment post release through reentry planning. This paper constructs cost estimates for three different reentry investments using data on the population (n = 2715) of male mentally…
DOT National Transportation Integrated Search
2010-09-01
In an effort to promote the use of increasing stockpiles of waste tires and a growing demand for adequate : backfill material in highway construction, NMDOT has embarked on a move to use compressed tire-bales : as a means to reduce cost of constructi...
ERIC Educational Resources Information Center
Kennedy, Mike
2012-01-01
Even though the economy has not bounced back, many education institutions have to provide additional space to accommodate increased enrollment or new programs, and even at schools and universities where the student population is stagnant or declining, some facilities are aging and outdated--as the cost of renovating or replacing them grows every…
Environmental Hazards and Systems Schools. Technical Report No. 81.
ERIC Educational Resources Information Center
Dexter, Arthur
The purpose of this study was to ascertain the feasibility of incorporating certain protective concepts into selected systems-constructed schools. These concepts were to be incorporated at a minimal cost increase, with minimal sacrifice of amenities, and with no detrimental effect on facility configuration. The environmental hazards taken into…
Solar Glazing Tips for School Construction
ERIC Educational Resources Information Center
Smith, Jonathan
2012-01-01
Glazing can be optimized to enhance passive solar heating and daylight harvesting by exceeding the prescriptive limits of the energy code. This savings can be garnered without the high cost of external overhangs or expensive glazing products. The majority of savings from solar glazing are attributable to the increase in solar heating and…
Construction of a low-cost luximeter
NASA Astrophysics Data System (ADS)
Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.
2016-04-01
This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
A review on past and present development on the interlocking loadbearing hollow block (ILHB) system
NASA Astrophysics Data System (ADS)
Bosro, M. Z. M.; Samad, A. A. A.; Mohamad, N.; Goh, W. I.; Tambichik, M. A.; Iman, M. A.
2018-04-01
Massive migration and increasing population in Malaysia has contributed to the increasing demand of quality and affordable housing. Over the past 50 years, the Malaysian housing industry has seen the growth of using conventional construction system such as reinforced concrete frame structures and bricks. The conventional system, as agreed by many researchers, causes delays and other disadvantages in some of the construction projects. Thus, the utilization of interlocking loadbearing hollow block (ILHB) system is needed to address these issues. This system has been identified as an alternative and sustainable building system for the construction industry in Malaysia which the PUTRA block system is the latest example of the ILHB developed. The system offers various advantages in terms of speed and cost in construction, strength, environmentally friendly and aesthetic qualities. Despite these advantages, this system has not been practically applied and develop in Malaysia. Therefore, this paper aims to review the past and present development of the interlocking loadbearing hollow block (ILHB) system that available locally and globally.
Murphy, Colin W; Parker, Nathan C
2014-02-18
Air pollution emissions regulation can affect the location, size, and technology choice of potential biofuel production facilities. Difficulty in obtaining air pollutant emission permits and the cost of air pollution control devices have been cited by some fuel producers as barriers to development. This paper expands on the Geospatial Bioenergy Systems Model (GBSM) to evaluate the effect of air pollution control costs on the availability, cost, and distribution of U.S. biofuel production by subjecting potential facility locations within U.S. Clean Air Act nonattainment areas, which exceed thresholds for healthy air quality, to additional costs. This paper compares three scenarios: one with air quality costs included, one without air quality costs, and one in which conversion facilities were prohibited in Clean Air Act nonattainment areas. While air quality regulation may substantially affect local decisions regarding siting or technology choices, their effect on the system as a whole is small. Most biofuel facilities are expected to be sited near to feedstock supplies, which are seldom in nonattainment areas. The average cost per unit of produced energy is less than 1% higher in the scenarios with air quality compliance costs than in scenarios without such costs. When facility construction is prohibited in nonattainment areas, the costs increase by slightly over 1%, due to increases in the distance feedstock is transported to facilities in attainment areas.
Code of Federal Regulations, 2011 CFR
2011-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Green Energy in New Construction: Maximize Energy Savings and Minimize Cost
ERIC Educational Resources Information Center
Ventresca, Joseph
2010-01-01
People often use the term "green energy" to refer to alternative energy technologies. But green energy doesn't guarantee maximum energy savings at a minimum cost--a common misconception. For school business officials, green energy means getting the lowest energy bills for the lowest construction cost, which translates into maximizing green energy…
Trussell, James; Henry, Nathaniel; Hassan, Fareen; Prezioso, Alexander; Law, Amy; Filonenko, Anna
2013-02-01
This study evaluated the total costs of unintended pregnancy (UP) in the United States (US) from a third-party health care payer perspective and explored the potential role for long-acting reversible contraception (LARC) in reducing UP and resulting health care expenditure. An economic model was constructed to estimate direct costs of UP as well as the proportion of UP costs that could be attributed to imperfect contraceptive adherence. The model considered all women requiring reversible contraception in the US: the pattern of contraceptive use and the rates of UP were derived from published sources. The costs of UP in the United States and the proportion of total cost that might be avoided by improved adherence through increased use of LARC were estimated. Annual medical costs of UP in the United States were estimated to be $4.6 billion, and 53% of these were attributed to imperfect contraceptive adherence. If 10% of women aged 20-29 years switched from oral contraception to LARC, total costs would be reduced by $288 million per year. Imperfect contraceptive adherence leads to substantial UP and high, avoidable costs. Improved uptake of LARC may generate health care cost savings by reducing contraceptive non-adherence. Copyright © 2013 Elsevier Inc. All rights reserved.
Trussell, James; Henry, Nathaniel; Hassan, Fareen; Prezioso, Alexander; Law, Amy; Filonenko, Anna
2013-01-01
Background This study evaluated the total costs of unintended pregnancy (UP) in the United States from a third -party health care payer perspective and explored the potential role for long-acting reversible contraception (LARC) in reducing UP and resulting health care expenditure. Study Design An economic model was constructed to estimate direct costs of UP as well as the proportion of UP costs that could be attributed to imperfect contraceptive adherence. The model considered all US women requiring reversible contraception: the pattern of contraceptive use and rates of UP were derived from published sources. The costs of UP in the United States and the proportion of total cost that might be avoided by improved adherence through increased use of LARC were estimated. Results Annual medical costs of UP in the United States were estimated to be $4.5 billion, and 53% of these were attributed to imperfect contraceptive adherence. If 10% of women aged 20–29 years switched from oral contraception to LARC, total costs would be reduced by $288 million per year. Conclusions Imperfect contraceptive adherence leads to substantial unintended pregnancy and high, avoidable costs. Improved uptake of LARC may generate health care cost savings by reducing contraceptive non-adherence. PMID:22959904
Increased costs to US pavement infrastructure from future temperature rise
NASA Astrophysics Data System (ADS)
Underwood, B. Shane; Guido, Zack; Gudipudi, Padmini; Feinberg, Yarden
2017-10-01
Roadway design aims to maximize functionality, safety, and longevity. The materials used for construction, however, are often selected on the assumption of a stationary climate. Anthropogenic climate change may therefore result in rapid infrastructure failure and, consequently, increased maintenance costs, particularly for paved roads where temperature is a key determinant for material selection. Here, we examine the economic costs of projected temperature changes on asphalt roads across the contiguous United States using an ensemble of 19 global climate models forced with RCP 4.5 and 8.5 scenarios. Over the past 20 years, stationary assumptions have resulted in incorrect material selection for 35% of 799 observed locations. With warming temperatures, maintaining the standard practice for material selection is estimated to add approximately US$13.6, US$19.0 and US$21.8 billion to pavement costs by 2010, 2040 and 2070 under RCP4.5, respectively, increasing to US$14.5, US$26.3 and US$35.8 for RCP8.5. These costs will disproportionately affect local municipalities that have fewer resources to mitigate impacts. Failing to update engineering standards of practice in light of climate change therefore significantly threatens pavement infrastructure in the United States.
NASA Astrophysics Data System (ADS)
Perry, H.
1980-06-01
This paper presents an overview of United States and world petroleum, natural gas, and natural gas liquids presumed recoverable but as yet undiscovered resources and suggests that the depletion of these fuels may not occur as quickly as frequently predicted. The paper points out that the construction of a synthetic fuels industry will be very costly and will provide only a small amount of increased energy independence. The fear is expressed that haste in accepting a specific synfuels process on the basis of present technology may serve to forestall the development of a better technology. The paper suggests that we construct relatively few plants now each using a different technology in order to gain better understanding of the various technologies, more information on costs and the essential but as yet unknown information on environmental and socioeconomic effects of large scale plants.
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
Funayama-Noguchi, Sachiko; Noguchi, Ko; Terashima, Ichiro
2015-03-01
White lupin (Lupinus albus) produces cluster roots, an adaptation to low soil phosphorus (P). Cluster roots exude large levels of P-solubilizing compounds such as citrate and malate. In contrast, narrow leaf lupin (L. angustifolius) is closely related to L. albus, but does not produce cluster roots. To examine the different strategies for P acquisition, we compared the growth, biomass allocation, respiratory properties and construction cost between L. albus and L. angustifolius under P-deficient conditions. Both Lupinus species were grown in hydroponic culture with 1 or 100 μM P. Under the P-deficient regime, L. albus produced cluster roots with little change in biomass allocation, while L. angustifolius significantly increased biomass allocation to roots. The rate of cyanide-resistant SHAM (salicylhydroxamic acid)-sensitive respiration was high in cluster roots and very low in roots of L. angustifolius. These results suggest a low alternative oxidase (AOX) activity in L. angustifolius roots, and thus, ATP would be produced efficiently in L. angustifolius roots. The construction cost was highest in cluster roots and lowest in L. angustifolius roots. This study shows that under P deficiency, L. albus produces high-cost cluster roots to increase the P availability, while L. angustifolius produces large quantities of low-cost roots to enhance P uptake. © 2014 John Wiley & Sons Ltd.
HIV/STD risk behaviors and perceptions among rural-to-urban migrants in China.
Li, Xiaoming; Fang, Xiaoyi; Lin, Danhua; Mao, Rong; Wang, Jing; Cottrell, Lesley; Harris, Carole; Stanton, Bonita
2004-12-01
Data from 2,153 sexually active rural-to-urban migrants in China were analyzed to examine the relationship between the movement of rural-to-urban migration and increased HIV/STD (sexually transmitted disease) risk and the applicability of constructs of a Western-based theory of behavioral change to the study population. Measurements included migrant mobility, sexual risk, and the seven constructs of the protection motivation theory (PMT). Data in the current study suggest that high mobility among rural-to-urban migrants was associated with increased sexual risk. The PMT constructs are applicable in identifying perceptions and attitudes associated with sexual risk behaviors in this culturally distinct population. Increased sexual risk was associated with increased perceptions of extrinsic rewards, intrinsic rewards, and response cost. Also consistent with PMT, increased sexual risk was associated with perceptions of decreased severity, vulnerability, response efficacy, and self-efficacy. After controlling for a number of key confounding factors, all seven PMT constructs were associated with sexual risk in the manner posited by the theory. The association between mobility and sexual risk underscores the importance of effective HIV/STD prevention efforts among this vulnerable population. The social cognitive theories including the PMT may form a logical base for prevention intervention programs targeting rural-to-urban migrants in China.
When does it pay to invest in a patch? The evolution of intentional niche construction.
Mohlenhoff, Kathryn A; Codding, Brian F
2017-09-01
Humans modify their environments in ways that significantly transform the earth's ecosystems. Recent research suggests that such niche-constructing behaviors are not passive human responses to environmental variation, but instead should be seen as active and intentional management of the environment. Although such research is useful in highlighting the interactive dynamics between humans and their natural world, the niche-construction framework, as currently applied, fails to explain why people would decide to modify their environments in the first place. To help resolve this problem, we use a model of technological intensification to analyze the cost-benefit trade-offs associated with niche construction as a form of patch investment. We use this model to assess the costs and benefits of three paradigmatic cases of intentional niche construction in Western North America: the application of fire in acorn groves, the manufacture of fishing weirs, and the adoption of maize agriculture. Intensification models predict that investing in patch modification (niche construction) only provides a net benefit when the amount of resources needed crosses a critical threshold that makes the initial investment worthwhile. From this, it follows that low-cost investments, such as burning in oak groves, should be quite common, while more costly investments, such as maize agriculture, should be less common and depend on the alternatives available in the local environment. We examine how patterns of mobility, risk management, territoriality, and private property also co-evolve with the costs and benefits of niche construction. This approach illustrates that explaining niche-constructing behavior requires understanding the economic trade-offs involved in patch investment. Integrating concepts from niche construction and technological intensification models within a behavioral ecological framework provides insights into the coevolution and active feedback between adaptive behaviors and environmental change across human history. © 2017 Wiley Periodicals, Inc.
Hospital cost analysis of neuromuscular scoliosis surgery.
Diefenbach, Christopher; Ialenti, Marc N; Lonner, Baron S; Kamerlink, Jonathan R; Verma, Kushagra; Errico, Thomas J
2013-01-01
A retrospective review of 74 consecutive, surgical patients with neuromuscular scoliosis (NMS). This study evaluates the distribution of hospital and operating room costs incurred during surgical correction of NMS. Recent studies have demonstrated that surgical treatment improves both medical outcomes and the quality of life in patients with progressive NMS. Characterization of the costs incurred at the time of surgery and hospitalization will facilitate the identification of opportunities for cost reduction. Demographic data collected included gender, age, preoperative height, weight, and BMI. Major coronal curvatures and T5-T12 kyphosis were assessed from radiographs. Construct type and number of screws, hooks, and wires implanted were recorded. Surgical costs were calculated based on cost of surgical correction, hospital stay, and postoperative care. Mean age was 15.8 ± 7.3 years; 57% were male. Comorbidities included cerebral palsy (28%) and familial dysautonomia (14%). The mean preoperative major curve magnitude was 60°; minor curve magnitude was 33°. Posterior approach (76%) and pedicle screws (75%) were predominantly utilized. The average length of hospitalization was 8 days (range: 3 to 47). There were six major complications (8%). The total surgical cost was $50,096 ± $23,998. The highest individual cost was for implants ($13,916; 24% of total costs). The second highest was inpatient room and ICU costs ($12,483; 22%); bone grafts were the third ($6,398; 11%). Increased major and minor structural curve, increased total (A/P) levels fused, and increased length of hospital stay predicted an increase in total cost. Major contributors to cost in NMS surgery are implants, inpatient room and ICU costs, and bone grafts. Independent predictors of higher cost are the degree of major and minor structural curve, total number of A/P levels fused, and length of hospital stay. These conclusions provide insight into costs associated with care for a medically fragile and challenging patient population.
European attitudes to water pricing: Internalizing environmental and resource costs.
Kejser, Anne
2016-12-01
Efficient use of the water resource requires internalization of all costs in the price of water, including environmental and resource costs. However, water resource management tends to be highly political and increasing water prices are a sensitive and complicated policy matter. Hence, there is a need for increased understanding of the implementation process and the attitudes towards implementation among the general public. This paper explores the spatial heterogeneity in the public attitude towards internalizing environmental and resource costs in the price of water across the EU regions. Within an extensive spatial dataset constructed for the purpose, we estimate the effect of individual information levels and affordability concerns on the attitude towards environmental water pricing. Information about water problems is found to have a significant and positive effect on attitudes as is affordability concern, which may be explained by expectations of inequity measures to come in place in parallel with increasing water prices. Overall these results support the hypothesis that lack of information and affordability concern could lead to resistance towards efficient water pricing among the general public. Copyright © 2016 Elsevier Ltd. All rights reserved.
Strogen, Bret; Horvath, Arpad; Zilberman, David
2013-12-01
Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. Copyright © 2013 Elsevier Ltd. All rights reserved.
Why do households invest in sanitation in rural Benin: Health, wealth, or prestige?
NASA Astrophysics Data System (ADS)
Gross, Elena; Günther, Isabel
2014-10-01
Seventy percent of the rural population in sub-Saharan Africa does not use adequate sanitation facilities. In rural Benin, as much as 95% of the population does not use improved sanitation. By analyzing a representative sample of 2000 rural households, this paper explores why households remain without latrines. Our results show that wealth and latrine prices play the most decisive role for sanitation demand and ownership. At current income levels, sanitation coverage will only increase to 50% if costs for construction are reduced from currently 190 USD to 50 USD per latrine. Our analysis also suggests that previous sanitation campaigns, which were based on prestige and the allure of a modern lifestyle as motives for latrine construction, have had no success in increasing sanitation coverage. Moreover, improved public health, which is the objective of public policies promoting sanitation, will not be effective at low sanitation coverage rates. Fear at night, especially of animals, and personal harassment, are stated as the most important motivational factors for latrine ownership and the intention to build one. We therefore suggest changing the message of sanitation projects and introduce new low-cost technologies into rural markets; otherwise, marketing strategies will continue to fail in increasing sanitation demand.
1980-11-01
2.317 Alternative #2R 91 2.319 Alternative #3 91 2.320 Alternative #4 92 2.321 Alternative #5 92 2.322 Gas /Electricity 92 2.323 Alternative #1 92...runoff fromt on-site Pollutants (litter, oil , fertilizer, pesticides, animal wastes). - Increased erosion and turbidity in runoff during construction...costs to the City of Novato. 1. Public Services/Utilities. - Increased consumption of gas , electricity and water. - Increased wastewater generation
Spacecraft control center automation using the generic inferential executor (GENIE)
NASA Technical Reports Server (NTRS)
Hartley, Jonathan; Luczak, Ed; Stump, Doug
1996-01-01
The increasing requirement to dramatically reduce the cost of mission operations led to increased emphasis on automation technology. The expert system technology used at the Goddard Space Flight Center (MD) is currently being applied to the automation of spacecraft control center activities. The generic inferential executor (GENIE) is a tool which allows pass automation applications to be constructed. The pass script templates constructed encode the tasks necessary to mimic flight operations team interactions with the spacecraft during a pass. These templates can be configured with data specific to a particular pass. Animated graphical displays illustrate the progress during the pass. The first GENIE application automates passes of the solar, anomalous and magnetospheric particle explorer (SAMPEX) spacecraft.
Epstein, Nancy E.
2012-01-01
Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321
DOE Office of Scientific and Technical Information (OSTI.GOV)
Horowitz, Kelsey A. W.; Fu, Ran; Woodhouse, Michael
This article examines current cost drivers and potential avenues to reduced cost for monolithic, glass-glass Cu(In,Ga)(Se,S)2 (CIGS) modules by constructing a comprehensive bottom-up cost model. For a reference case where sputtering plus batch sulfurization after selenization (SAS) is employed, we compute a manufacturing cost of $69/m2 if the modules are made in the United States at a 1 GW/year production volume. At 14% module efficiency, this corresponds to a manufacturing cost of $0.49/WDC and a minimum sustainable price (MSP) of $0.67/WDC. We estimate that MSP could vary within +/-20% of this value given the range of quoted input prices, andmore » existing variations in module design, manufacturing processes, and manufacturing location. Potential for reduction in manufacturing costs to below $0.40/WDC may be possible if average production module efficiencies can be increased above 17% without increasing $/m2 costs; even lower costs could be achieved if $/m2 costs could be reduced, particularly via innovations in the CIGS deposition process or balance-of-module elements. We present the impact on cost of regional factors, CIGS deposition method, device design, and price fluctuations. One metric of competitiveness-levelized cost of energy (LCOE) -- is also assessed for several U.S. locations and compared to that of standard multi-crystalline silicon (m(c-Si)) and cadmium telluride (CdTe).« less
Improving building performance using smart building concept: Benefit cost ratio comparison
NASA Astrophysics Data System (ADS)
Berawi, Mohammed Ali; Miraj, Perdana; Sayuti, Mustika Sari; Berawi, Abdur Rohim Boy
2017-11-01
Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.
Construction engineering inspection direct cost survey.
DOT National Transportation Integrated Search
2014-07-01
The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
New double-byte error-correcting codes for memory systems
NASA Technical Reports Server (NTRS)
Feng, Gui-Liang; Wu, Xinen; Rao, T. R. N.
1996-01-01
Error-correcting or error-detecting codes have been used in the computer industry to increase reliability, reduce service costs, and maintain data integrity. The single-byte error-correcting and double-byte error-detecting (SbEC-DbED) codes have been successfully used in computer memory subsystems. There are many methods to construct double-byte error-correcting (DBEC) codes. In the present paper we construct a class of double-byte error-correcting codes, which are more efficient than those known to be optimum, and a decoding procedure for our codes is also considered.
Guida, Ross J; Remo, Jonathan W F; Secchi, Silvia
2016-12-01
During the latter half of the 19th Century and first half of the 20th Century, the Illinois River was heavily altered through leveeing off large portions of its floodplain, draining wetlands, and the construction of dams and river-training structures that facilitated navigation. As a result of these alterations, flood stages continue to rise, increasing flood risk and threatening to overtop levees along the La Grange Segment (LGS) of the Illinois River. Over the last two decades, more emphasis has been placed on reconnecting portions of floodplains to rivers in order to solve the long-term problem of rising flood heights attributed to continual heightening of levees to provide flood protection. Multiple studies have suggested that strategically reconnecting larger portions of the LGS could result in more sustainable floodplain management. However, the true costs and benefits of reconnecting the floodplain are not known. We use a novel hydrodynamic, geospatial, economic, and habitat suitability framework to assess the tradeoffs of strategically reconnecting the Illinois River to its floodplain in order to decrease flood risk, improve floodplain habitats, and limit the costs of reconnection. Costs include building-associated losses, lost agricultural profits, and levee removal and construction costs. Tested scenarios demonstrate that while flood heights and environmental benefits are maximized through the most aggressive levee setbacks and removals, these scenarios also have the highest costs. However, the tradeoff of implementing lower-cost scenarios is that there is less flood-height reduction and less floodplain habitat available. Several individual levee districts have high potential for reconnection based on limiting potential damages as well as providing floodplain habitat. To implement large-scale strategic floodplain reconnection, costs range from $1.2-$4.3 billion. As such, payments for ecosystem services will likely be necessary to compensate landowners for decreased long-term agricultural production and building losses that result in flood-reduction benefits and increased floodplain habitat. Copyright © 2016 Elsevier B.V. All rights reserved.
Corps of Engineers’ Acquisition of Fish Hatchery Proves Costly.
1981-09-18
location, size, esti- mated cost, design , and construction timetables for facilities needed to meet the steelhead production requirements. To limit...hatchery "* * * is not recognized to be one of the more efficient and productive facilities in Idaho due to obvious con- straints in design , construction...agency’s decision to supply the product or service it- self because it would cost less must be supported by a comparativ , cost analysis. According to Corps
Evaluating the cost-effectiveness of laryngeal examination after elective total thyroidectomy.
Lang, Brian Hung-Hin; Wong, Carlos K H; Tsang, Raymond K Y; Wong, Kai Pun; Wong, Birgitta Y H
2014-10-01
Although routine laryngeal examination (RLE) after thyroidectomy may cost more than selective laryngeal examination (SLE), it permits earlier detection and treatment of vocal cord palsy (VCP) and so may be cost-saving in the longer term. We compared the 2-year cost-effectiveness between RLE and SLE with RLE performed at 2 weeks (SLE-2w), 1 month (SLE-1m), and 3 months (SLE-3m) after thyroidectomy in the institution's perspective. Our case definition was a hypothetical 50-year-old woman who underwent an elective total thyroidectomy for a benign multinodular goiter. A decision-analytic model was constructed to compare the estimated cost-effectiveness between RLE, SLE-2w, SLE-1m, and SLE-3m after a 2-year period. Outcome probabilities, utilities, and costs were estimated from the literature. The threshold for cost-effectiveness was set at US$50,000/quality-adjusted life-year. Sensitivity and threshold analyses were used to examine model uncertainty. RLE was not cost-effective because its incremental cost-effectiveness ratio to SLE-2w, SLE-1m, and SLE-3m were US$302,755, US$227,883 and US$247,105, respectively. RLE was only cost-effective when the temporary VCP rate increased >42.7 % or when the cost of RLE equaled zero. Similarly, SLE-2w was only cost-effective to SLE-3m when dysphonia for temporary VCP at 3 months increased >39.13 %, dysphonia for permanent VCP at 3 months increased >50.29 %, or dysphonia without VCP at 3 months increased >42.69 %. However, none of these scenarios appeared clinically likely. In the institution's perspective, RLE was not cost-effective against the other three SLE strategies. Regarding to the optimal timing of SLE, SLE-3m appears to be a reasonable and acceptable strategy because of its relative low overall cost.
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
NASA Astrophysics Data System (ADS)
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Low-cost satellite mechanical design and construction
NASA Astrophysics Data System (ADS)
Boisjolie-Gair, Nathaniel; Straub, Jeremy
2017-05-01
This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.
Steffes, Sally; Sandstrom, Michael
2008-01-01
Several challenges await new assistant professors setting up a neuroscience lab, and obtaining sufficient research help is typically a top priority. A secondary, but no less daunting, challenge is juggling accuracy and reliability with costs and limited start-up funds. These concerns are particularly crucial for those engaging technically sophisticated measurements, such as microdialysis. We have developed straightforward procedures that our undergraduate students have utilized to successfully construct high-quality, low-cost microdialysis probes. Students mastering the various steps involved have also gained valuable insight into their use, troubleshooting, and the implications of data obtained from these constructed probes. These procedures are explained here to foster increased use in neuroscience labs that involve undergraduates, along with pointers about teaching the technique to newcomers. Students who master the techniques can pass them on to new students easily. These procedures train students in the overall research technique of microdialysis more thoroughly than when manufactured probes are used, they save money, and will eventually save the principal investigator time when students develop independence with troubleshooting and repairs. PMID:23493044
Compact cladding-pumped planar waveguide amplifier and fabrication method
Bayramian, Andy J.; Beach, Raymond J.; Honea, Eric; Murray, James E.; Payne, Stephen A.
2003-10-28
A low-cost, high performance cladding-pumped planar waveguide amplifier and fabrication method, for deployment in metro and access networks. The waveguide amplifier has a compact monolithic slab architecture preferably formed by first sandwich bonding an erbium-doped core glass slab between two cladding glass slabs to form a multi-layer planar construction, and then slicing the construction into multiple unit constructions. Using lithographic techniques, a silver stripe is deposited and formed at a top or bottom surface of each unit construction and over a cross section of the bonds. By heating the unit construction in an oven and applying an electric field, the silver stripe is then ion diffused to increase the refractive indices of the core and cladding regions, with the diffusion region of the core forming a single mode waveguide, and the silver diffusion cladding region forming a second larger waveguide amenable to cladding pumping with broad area diodes.
STANDARDIZED COSTS FOR WATER SUPPLY DISTRIBUTION SYSTEMS
Presented within the report are cost data for construction and operation/maintenance of domestic water distribution and transmission pipelines, domestic water pumping stations, and domestic water storage reservoirs. To allow comparison of new construction with rehabilitation of e...
Gachango, F G; Pedersen, S M; Kjaergaard, C
2015-12-01
Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis
NASA Technical Reports Server (NTRS)
Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven
1997-01-01
Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.
Staged, High-Pressure Oxy-Combustion Technology: Development and Scale-Up
DOE Office of Scientific and Technical Information (OSTI.GOV)
Axelbaum, Richard; Kumfer, Benjamin; Gopan, Akshay
The immediate need for a high efficiency, low cost carbon capture process has prompted the recent development of pressurized oxy-combustion. With a greater combustion pressure the dew point of the flue gas is increased, allowing for effective integration of the latent heat of flue gas moisture into the Rankine cycle. This increases the net plant efficiency and reduces costs. A novel, transformational process, named Staged, Pressurized Oxy-Combustion (SPOC), achieves additional step changes in efficiency and cost reduction by significantly reducing the recycle of flue gas. The research and development activities conducted under Phases I and II of this project (FE0009702)more » include: SPOC power plant cost and performance modeling, CFD-assisted design of pressurized SPOC boilers, theoretical analysis of radiant heat transfer and ash deposition, boiler materials corrosion testing, construction of a 100 kWth POC test facility, and experimental testing. The results of this project have advanced the technology readiness level (TRL) of the SPOC technology from 1 to 5.« less
The Role of Penal Quarantine in Reducing Violent Crime
ERIC Educational Resources Information Center
Johnson, Perry M.
1978-01-01
An examination of the limits of quarantine's potential effect under actual and ideal circumstances leads to the conclusion that current proposals for increasing the use of quarantine would reduce serious violent crime by no more than 10 percent at a staggering cost for prison construction and operation. Two alternative proposals are presented.…
Assessing administrative costs of mental health and substance abuse services.
Broyles, Robert W; Narine, Lutchmie; Robertson, Madeline J
2004-05-01
Increasing competition in the market for mental health and substance abuse MHSA services and the potential to realize significant administrative savings have created an imperative to monitor, evaluate, and control spending on administrative functions. This paper develops a generic model that evaluates spending on administrative personnel by a group of providers. The precision of the model is demonstrated by examining a set of data assembled from five MHSA service providers. The model examines a differential cost construction derived from inter-facility comparisons of administrative expenses. After controlling for the scale of operations, the results enable MHSA programs to control the efficiency of administrative personnel and related rates of compensation. The results indicate that the efficiency of using the administrative complement and the scale of operations represent the lion's share of the total differential cost. The analysis also indicates that a modest improvement in the use of administrative personnel results in substantial cost savings, an increase in the net cash flow derived from operations, an improvement in the fiscal performance of the provider, and a decline in opportunity costs that assume the form of foregone direct patient care.
A Study on the Rheological Properties of Recycled Rubber-Modified Asphalt Mixtures
Karacasu, Murat; Er, Arzu
2015-01-01
Using waste rubber in asphalt mixes has become a common practice in road construction. This paper presents the results of a study on the rheological characteristics of rubber-modified asphalt (RMA) concrete under static and dynamic loading conditions. A number of static and dynamic creep tests were conducted on RMA mix specimens with different rubber sizes and contents, and a series of resonant column tests were conducted to evaluate the shear modulus and damping values. To simulate the stress-strain response of traffic-induced loading, the measurements were taken for different confining pressures and strain levels. The results of the study indicated that rubber modification increases stiffness and damping ratio, making it a very attractive material for use in road construction. However the grain size of the rubber is very important. Although RMA may cost up to 100% more than regular asphalt, the advantages it brings, such as an increased service life of the road and proper waste utilization contributing to a more sustainable infrastructure, may justify the added cost. PMID:25695096
Fleetcroft, Robert; Schofield, Peter; Duerden, Martin; Ashworth, Mark
2012-12-01
There is conflicting evidence as to whether achievement of cholesterol targets at the population level is dependent on the choice and cost of statin. To investigate the practice-level relationship between cholesterol quality indicators in patients with heart disease, stroke, and diabetes and prescribing of low-cost statins. Correlations and linear regression modelling of retrospective cross-sectional practice-level data with potential explanatory variables in 7909 (96.4%) general practices in England in 2008-2009. Quality indicator data were obtained from the Information Centre and prescribing data from the NHS Business Authority. A 'cholesterol quality indicator' score was constructed by dividing the numbers of patients achieving the target for cholesterol control of ≤5 mmol/l in stroke, diabetes, and heart disease by the numbers on each register. A 'low-cost statin' ratio score was constructed by dividing the numbers of defined daily doses of simvastatin and pravastatin by the total numbers of defined daily doses of statins. Simvastatin accounted for 83.3% (standard deviation [SD] = 15.7%) of low-cost statins prescribed and atorvastatin accounted for 85.7% (SD = 14.8%) of high-cost statins prescribed. The mean cholesterol score was 73.7% (SD = 6.0%). Practices using a higher proportion of the low-cost statins were less successful in achieving cholesterol targets. An increase of 10% in the prescribing of low-cost statins was associated with a decrease of 0.46% in the cholesterol quality indicator score (95% confidence interval = -0.54% to -0.38%, P<0.001). Greater use of low-cost statins was associated with a small reduction in cholesterol control.
Akazawa, Manabu; Stearns, Sally C; Biddle, Andrea K
2008-01-01
Objective To assess costs, effectiveness, and cost-effectiveness of inhaled corticosteroids (ICS) augmenting bronchodilator treatment for chronic obstructive pulmonary disease (COPD). Data Sources Claims between 1997 and 2005 from a large managed care database. Study Design Individual-level, fixed-effects regression models estimated the effects of initiating ICS on medical expenses and likelihood of severe exacerbation. Bootstrapping provided estimates of the incremental cost per severe exacerbation avoided. Data Extraction Methods COPD patients aged 40 or older with ≥15 months of continuous eligibility were identified. Monthly observations for 1 year before and up to 2 years following initiation of bronchodilators were constructed. Principal Findings ICS treatment reduced monthly risk of severe exacerbation by 25 percent. Total costs with ICS increased for 16 months, but declined thereafter. ICS use was cost saving 46 percent of the time, with an incremental cost-effectiveness ratio of $2,973 per exacerbation avoided; for patients ≥50 years old, ICS was cost saving 57 percent of time. Conclusions ICS treatment reduces exacerbations, with an increase in total costs initially for the full sample. Compared with younger patients with COPD, patients aged 50 or older have reduced costs and improved outcomes. The estimated cost per severe exacerbation avoided, however, may be high for either group because of uncertainty as reflected by the large standard errors of the parameter estimates. PMID:18671750
Construction of VLCC marine oil storage cost index system
NASA Astrophysics Data System (ADS)
Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen
2018-04-01
VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
The design and construction of a cost-efficient confocal laser scanning microscope
NASA Astrophysics Data System (ADS)
Xi, Peng; Rajwa, Bartlomiej; Jones, James T.; Robinson, J. Paul
2007-03-01
The optical dissection ability of confocal microscopy makes it a powerful tool for biological materials. However, the cost and complexity of confocal scanning laser microscopy hinders its wide application in education. We describe the construction of a simplified confocal scanning laser microscope and demonstrate three-dimensional projection based on cost-efficient commercial hardware, together with available open source software.
Cost-effectiveness of a vaccine to prevent herpes zoster and postherpetic neuralgia in older adults.
Rothberg, Michael B; Virapongse, Anunta; Smith, Kenneth J
2007-05-15
A vaccine to prevent herpes zoster was recently approved by the United States Food and Drug Administration. We sought to determine the cost-effectiveness of this vaccine for different age groups. We constructed a cost-effectiveness model, based on the Shingles Prevention Study, to compare varicella zoster vaccination with usual care for healthy adults aged >60 years. Outcomes included cost in 2005 US dollars and quality-adjusted life expectancy. Costs and natural history data were drawn from the published literature; vaccine efficacy was assumed to persist for 10 years. For the base case analysis, compared with usual care, vaccination increased quality-adjusted life expectancy by 0.0007-0.0024 quality-adjusted life years per person, depending on age at vaccination and sex. These increases came almost exclusively as a result of prevention of acute pain associated with herpes zoster and postherpetic neuralgia. Vaccination also increased costs by $94-$135 per person, compared with no vaccination. The incremental cost-effectiveness ranged from $44,000 per quality-adjusted life year saved for a 70-year-old woman to $191,000 per quality-adjusted life year saved for an 80-year-old man. For the sensitivity analysis, the decision was most sensitive to vaccine cost. At a cost of $46 per dose, vaccination cost <$50,000 per quality-adjusted life year saved for all adults >60 years of age. Other variables related to the vaccine (duration, efficacy, and adverse effects), postherpetic neuralgia (incidence, duration, and utility), herpes zoster (incidence and severity), and the discount rate all affected the cost-effectiveness ratio by >20%. The cost-effectiveness of the varicella zoster vaccine varies substantially with patient age and often exceeds $100,000 per quality-adjusted life year saved. Age should be considered in vaccine recommendations.
Platelet lysate-based pro-angiogenic nanocoatings.
Oliveira, Sara M; Pirraco, Rogério P; Marques, Alexandra P; Santo, Vítor E; Gomes, Manuela E; Reis, Rui L; Mano, João F
2016-03-01
Human platelet lysate (PL) is a cost-effective and human source of autologous multiple and potent pro-angiogenic factors, such as vascular endothelial growth factor A (VEGF A), fibroblast growth factor b (FGF b) and angiopoietin-1. Nanocoatings previously characterized were prepared by layer-by-layer assembling incorporating PL with marine-origin polysaccharides and were shown to activate human umbilical vein endothelial cells (HUVECs). Within 20 h of incubation, the more sulfated coatings induced the HUVECS to the form tube-like structures accompanied by an increased expression of angiogenic-associated genes, such as angiopoietin-1 and VEGF A. This may be a cost-effective approach to modify 2D/3D constructs to instruct angiogenic cells towards the formation of neo-vascularization, driven by multiple and synergistic stimulations from the PL combined with sulfated polysaccharides. The presence, or fast induction, of a stable and mature vasculature inside 3D constructs is crucial for new tissue formation and its viability. This has been one of the major tissue engineering challenges, limiting the dimensions of efficient tissue constructs. Many approaches based on cells, growth factors, 3D bioprinting and channel incorporation have been proposed. Herein, we explored a versatile technique, layer-by-layer assembling in combination with platelet lysate (PL), that is a cost-effective source of many potent pro-angiogenic proteins and growth factors. Results suggest that the combination of PL with sulfated polyelectrolytes might be used to introduce interfaces onto 2D/3D constructs with potential to induce the formation of cell-based tubular structures. Copyright © 2015 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.
Highway construction cost comparison survey : final report
DOT National Transportation Integrated Search
2002-04-01
Over the past few years the Washington State Department of Transportation (WSDOT) has been asked numerous questions related to the cost of highway construction in Washington State as compared to other states. In order to address these questions, WSDO...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
NASA Astrophysics Data System (ADS)
Wu, H. Felix; Wan, Yan
2014-03-01
Our nation's infrastructural systems are crumbling. The deteriorating process grows over time. The physical aging of these vital facilities and the remediation of their current critical state pose a key societal challenge to the United States. Current sensing technologies, while well developed in controlled laboratory environments, have not yet yielded tools for producing real-time, in-situ data that are adequately comprehensible for infrastructure decision-makers. The need for advanced sensing technologies is national because every municipality and state in the nation faces infrastructure management challenges. The need is critical because portions of infrastructure are reaching the end of their life-spans and there are few cost-effective means to monitor infrastructure integrity and to prioritize the renovation and replacement of infrastructure elements. New advanced sensing technologies that produce cost-effective inspection and real-time monitoring data, and that can also help or aid in meaningful interpretation of the acquired data, therefore will enhance the safety in regard to the public on structural integrity by issuing timely and accurate alert data for effective maintenance to avoid disasters happening. New advanced sensing technologies also allow more informed management of infrastructural investments by avoiding premature replacement of infrastructure and identifying those structures in need of immediate action to prevent from catastrophic failure. Infrastructure management requires that once a structural defect is detected, an economical and efficient repair be made. Advancing the technologies of repairing infrastructure elements in contact with water, road salt, and subjected to thermal changes requires innovative research to significantly extend the service life of repairs, lower the costs of repairs, and provide repair technologies that are suitable for a wide range of conditions. All these new technologies will provide increased lifetimes, security, and safety of elements of critical infrastructure for the Nation's already deteriorating civil infrastructure. It is envisioned that the Nation should look far beyond: not only should we efficiently and effectively address current problems of the aging infrastructure, but we must also further develop next-generation construction materials and processes for new construction. To accomplish this ambitious goal, we must include process efficiency that will help select the most reliable and cost-effective materials in construction processes; performance and cost will be the prime consideration for selections construction materials based on life-cycle cost and materials performance; energy efficiency will drive reduced energy consumption from current levels by 50 % per unit of output; and environmental responsiveness will achieve net-zero waste from construction materials and its constituents. Should it be successfully implemented, we will transform the current 21st century infrastructure systems to enable the vital functioning of society and improve competitiveness of the economy to ensure that our quality of life remains high.
Millar, J Alasdair; Millar, Robyn C
2014-01-01
The Australian federal government has proposed an AUD $7 patient co-payment for a general practitioner (GP) consultation. One effect of the co-payment may be that patients will seek assistance at public hospital emergency departments (EDs), where currently there is no user charge. We studied the possible financial impact of patient diversion on the Western Australia (WA) health budget. We constructed a spreadsheet model of changes in annual cash flows including the co-payment, GP fees for service, and rates of diversion to emergency departments with additional marginal costs for ED attendance. Changes in WA cash flows are the aggregate of marginal ED costs of treating diverted patients and added expenditure in fees paid to rural doctors who also man local emergency centres. The estimated costs to WA are AUD $6.3 million, $35.9 million and $87.4 million at 1, 5, and 10 per cent diversion, respectively. Commonwealth receipts increase and expenditure on Medicare benefits declines. A diversion of patients from GP surgeries to ED in WA caused by the co-payment will result in increased costs to the state, which may be substantial, and will reduce net costs to the Commonwealth.
Cost-effectiveness acceptability curves revisited.
Al, Maiwenn J
2013-02-01
Since the introduction of the cost-effectiveness acceptability curve (CEAC) in 1994, its use as a method to describe uncertainty around incremental cost-effectiveness ratios (ICERs) has steadily increased. In this paper, first the construction and interpretation of the CEAC is explained, both in the context of modelling studies and in the context of cost-effectiveness (CE) studies alongside clinical trials. Additionally, this paper reviews the advantages and limitations of the CEAC. Many of the perceived limitations can be attributed to the practice of interpreting the CEAC as a decision rule while it was not developed as such. It is argued that the CEAC is still a useful tool in describing and quantifying uncertainty around the ICER, especially in combination with other tools such as plots on the CE plane and value-of-information analysis.
Higher mortgages, lower energy bills: The real economics of buying an energy-efficient home
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, E.
1987-02-01
To measure the actual costs and benefits of buying an energy- efficient home, it is necessary to employ a cash-flow model that accounts for mortgage interest and other charges associated with the incremental costs of conservation measures. The ability to make payments gradually over the term of a mortgage, energy savings, and tax benefits contribute to increased cost effectiveness. Conversely, financial benefits are reduced by interest payments, insurance, taxes, and various fees linked to the (higher) sale price of an energy-efficient home. Accounting for these factors can yield a strikingly different picture from those given by commonly used ''engineering'' indicators,more » such as simple payback time, internal rate of return, or net present value (NPV), which are based solely on incremental costs and energy savings. This analysis uses actual energy savings data and incremental construction costs to evaluate the mortgage cash flow for 79 of the 144 energy-efficient homes constructed in Minnesota under the Energy-Efficient Housing Demonstration Program (EEHDP) initiated in 1980 by the Minnesota Housing Finance Agency. Using typical lending terms and fees, we find that the mean mortgage-NPV derived from the homeowners' real cash flow (including construction and financing costs) is 20% lower than the standard engineering-NPV of the conservation investment: $7981 versus $9810. For eight homes, the mortgage-NPV becomes negative once we account for the various mortgage-related effects. Sensitivities to interest rates, down payment, loan term, and marginal tax rate are included to illustrate the often large impact of alternative assumptions about these parameters. The most dramatic effect occurs when the loan term is reduced from 30 to 15 years and the mortgage NPV falls to -$925. We also evaluate the favorable Federal Home Administration (FHA) terms actually applied to the EEHDP homes. 8 refs., 4 figs., 3 tabs.« less
U.S. - Mexico Security Cooperation: The Time to Act Is Now
2011-01-06
laws will take considerable time and effort to achieve. It is worth the resources invested as it will provide the most benefit to all citizens if...limited number of border crossing checkpoints. Additional benefits of this construct would be to reduce the costs of goods, as transportation times and... benefits to society: billions of dollars in increased tax revenue, relief for overworked law enforcement, courts and prisons, and increased safety
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
DOT National Transportation Integrated Search
2003-04-01
The Louisiana Department of Transportation and Development (LADOTD) is interested in applying the Federal Highway Administration=s (FHWA) life cycle cost analysis procedures and model to large roadway construction, maintenance, and rehabilitation pro...
Construction costs, payback times, and the leaf economics of carnivorous plants.
Karagatzides, Jim D; Ellison, Aaron M
2009-09-01
Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.
Park, Marcelo; Mendes, Pedro Vitale; Zampieri, Fernando Godinho; Azevedo, Luciano Cesar Pontes; Costa, Eduardo Leite Vieira; Antoniali, Fernando; Ribeiro, Gustavo Calado de Aguiar; Caneo, Luiz Fernando; da Cruz Neto, Luiz Monteiro; Carvalho, Carlos Roberto Ribeiro; Trindade, Evelinda Marramon
2014-01-01
Objective To analyze the cost-utility of using extracorporeal oxygenation for patients with severe acute respiratory distress syndrome in Brazil. Methods A decision tree was constructed using databases from previously published studies. Costs were taken from the average price paid by the Brazilian Unified Health System (Sistema Único de Saúde; SUS) over three months in 2011. Using the data of 10,000,000 simulated patients with predetermined outcomes and costs, an analysis was performed of the ratio between cost increase and years of life gained, adjusted for quality (cost-utility), with survival rates of 40 and 60% for patients using extracorporeal membrane oxygenation. Results The decision tree resulted in 16 outcomes with different life support techniques. With survival rates of 40 and 60%, respectively, the increased costs were R$=-301.00/-14.00, with a cost of R$=-30,913.00/-1,752.00 paid per six-month quality-adjusted life-year gained and R$=-2,386.00/-90.00 per quality-adjusted life-year gained until the end of life, when all patients with severe ARDS were analyzed. Analyzing only patients with severe hypoxemia (i.e., a ratio of partial oxygen pressure in the blood to the fraction of inspired oxygen <100mmHg), the increased cost was R$=-5,714.00/272.00, with a cost per six-month quality-adjusted life-year gained of R$=-9,521.00/293.00 and a cost of R$=-280.00/7.00 per quality-adjusted life-year gained. Conclusion The cost-utility ratio associated with the use of extracorporeal membrane oxygenation in Brazil is potentially acceptable according to this hypothetical study. PMID:25295819
ERIC Educational Resources Information Center
Lowe, N. K., Ed.
This document provides technical information and simple instructions for constructing 84 different pieces of science equipment. Each entry includes: (1) name of item; (2) purpose of the equipment; (3) person who submitted the information; (4) line drawing of prototype; (5) list of low-cost materials needed; (6) construction procedures; (7)…
J. N. Kochenderfer; G. W. Wendel; H. Clay Smith
1984-01-01
A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...
A review of BIM (Building Information Modeling) implementation in Indonesia construction industry
NASA Astrophysics Data System (ADS)
Suryadinata Telaga, Abdi
2018-05-01
Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.
El-Naggar, Hesham M
2010-01-01
The main activity in Siwa Oasis society is the agriculture, it depends on the groundwater. The agricultural drainage water and the unused saline water of naturally flowing springs are poured into four main salty lakes. This leads to an increase in the surface area of the saltwater lakes, marshes and rise in water table levels. to investigate some environmental engineering interventions to control the expansion of saltwater surface area in Siwa Oasis. Field visits, observation sheets and questionnaire survey with farmers were carried out to find out the main environmental problems in the Oasis. Environmental survey was carried out to collect different rocks and stones samples as natural construction materials from the desert that surrounds Siwa Oasis. Physical analyses, chemical composition and principal mechanical parameters were conducted on the collected samples. After the analysis, the safa rocks were the best natural construction materials in the Siwa Oasis. So, it could be used to build a construction wall around the salty lakes and marshes. Walls could convert the lakes into basins. The water will be evaporated at high rate during summer season by solar energy. After evaporation, the remaining salty rock named "karshef" can be easily collected from the lakes to be used as a low cost construction material for traditional building houses in Siwa Oasis. Therefore, the water level of lakes will be reduced to dryness and land could be reused as agricultural land. Among different rocks, safa rocks proved to be the best natural construction materials to construct a defense wall around the lakes and marshes. They will save about 80% of the concrete cost. The formed karshef rocks from the lakes will be used in the construction of the traditional building houses which will save about 90% of the concrete buildings. This intervention will save energy as it exchanges fuel consuming man-made material such as cement with naturally made material. This can reduce the green house gases generated from the cement industry. Economical feasibility study should be carried out to estimate the capital cost for the retaining wall.
The trade-off between hospital cost and quality of care. An exploratory empirical analysis.
Morey, R C; Fine, D J; Loree, S W; Retzlaff-Roberts, D L; Tsubakitani, S
1992-08-01
The debate concerning quality of care in hospitals, its "value" and affordability, is increasingly of concern to providers, consumers, and purchasers in the United States and elsewhere. We undertook an exploratory study to estimate the impact on hospital-wide costs if quality-of-care levels were varied. To do so, we obtained costs and service output data regarding 300 U.S. hospitals, representing approximately a 5% cross section of all hospitals operating in 1983; both inpatient and outpatient services were included. The quality-of-care measure used for the exploratory analysis was the ratio of actual deaths in the hospital for the year in question to the forecasted number of deaths for the hospital; the hospital mortality forecaster had earlier (and elsewhere) been built from analyses of 6 million discharge abstracts, and took into account each hospital's actual individual admissions, including key patient descriptors for each admission. Such adjusted death rates have increasingly been used as potential indicators of quality, with recent research lending support for the viability of that linkage. The authors then utilized the economic construct of allocative efficiency relying on "best practices" concepts and peer groupings, built using the "envelopment" philosophy of Data Envelopment Analysis and Pareto efficiency. These analytical techniques estimated the efficiently delivered costs required to meet prespecified levels of quality of care. The marginal additional cost per each death deferred in 1983 was estimated to be approximately $29,000 (in 1990 dollars) for the average efficient hospital. Also, over a feasible range, a 1% increase in the level of quality of care delivered was estimated to increase hospital cost by an average of 1.34%. This estimated elasticity of quality on cost also increased with the number of beds in the hospital.
NASA Astrophysics Data System (ADS)
Dreicer, H.
1987-09-01
Potential commercial fusion power systems must be acceptable from a safety and environmental standpoint. They must also promise to be competitive with other sources of energy (i.e., fossil, fission, etc.) when considered from the standpoint of the cost of electricity (COE) and the unit direct cost (UDC) in dollars/kWe. These costs are affected by a host of factors including recirculating power, plant availability, construction time, capital cost, etc., and are influenced by technological complexity. In an attempt to meet these requirements, the emphasis of fusion research in the United States has been moving toward smaller, lower-cost systems. There is increased interest in higher beta tokamaks and stellarators, and in compact alternate concepts such as the Reversed Field Pinch (RFP) and the Compact Toroids (CTs) which are, in part, the subject of this paper.
Cost-effectiveness of hysteroscopy screening for infertile women.
Kasius, Jenneke C; Eijkemans, René J C; Mol, Ben W J; Fauser, Bart C J M; Fatemi, Human M; Broekmans, Frank J M
2013-06-01
This study assessed the cost-effectiveness of office hysteroscopy screening prior to IVF. Therefore, the cost-effectiveness of two distinct strategies - hysteroscopy after two failed IVF cycles (Failedhyst) and routine hysteroscopy prior to IVF (Routinehyst) - was compared with the reference strategy of no hysteroscopy (Nohyst). When present, intrauterine pathology was treated during hysteroscopy. Two models were constructed and evaluated in a decision analysis. In model I, all patients had an increase in pregnancy rate after screening hysteroscopy prior to IVF; in model II, only patients with intrauterine pathology would benefit. For each strategy, the total costs and live birth rates after a total of three IVF cycles were assessed. For model I (all patients benefit from hysteroscopy), Routinehyst was always cost-effective compared with Nohyst or Failedhyst. For the Routinehyst strategy, a monetary profit would be obtained in the case where hysteroscopy would increase the live birth rate after IVF by ≥ 2.8%. In model II (only patients with pathology benefit from hysteroscopy), Routinehyst also dominated Failedhyst. However, hysteroscopy performance resulted in considerable costs. In conclusion, the application of a routine hysteroscopy prior to IVF could be cost-effective. However, randomized trials confirming the effectiveness of hysteroscopy are needed. Copyright © 2013 Reproductive Healthcare Ltd. Published by Elsevier Ltd. All rights reserved.
Solving lot-sizing problem with quantity discount and transportation cost
NASA Astrophysics Data System (ADS)
Lee, Amy H. I.; Kang, He-Yau; Lai, Chun-Mei
2013-04-01
Owing to today's increasingly competitive market and ever-changing manufacturing environment, the inventory problem is becoming more complicated to solve. The incorporation of heuristics methods has become a new trend to tackle the complex problem in the past decade. This article considers a lot-sizing problem, and the objective is to minimise total costs, where the costs include ordering, holding, purchase and transportation costs, under the requirement that no inventory shortage is allowed in the system. We first formulate the lot-sizing problem as a mixed integer programming (MIP) model. Next, an efficient genetic algorithm (GA) model is constructed for solving large-scale lot-sizing problems. An illustrative example with two cases in a touch panel manufacturer is used to illustrate the practicality of these models, and a sensitivity analysis is applied to understand the impact of the changes in parameters to the outcomes. The results demonstrate that both the MIP model and the GA model are effective and relatively accurate tools for determining the replenishment for touch panel manufacturing for multi-periods with quantity discount and batch transportation. The contributions of this article are to construct an MIP model to obtain an optimal solution when the problem is not too complicated itself and to present a GA model to find a near-optimal solution efficiently when the problem is complicated.
WEB-BASED DATABASE ON RENEWAL TECHNOLOGIES ...
As U.S. utilities continue to shore up their aging infrastructure, renewal needs now represent over 43% of annual expenditures compared to new construction for drinking water distribution and wastewater collection systems (Underground Construction [UC], 2016). An increased understanding of renewal options will ultimately assist drinking water utilities in reducing water loss and help wastewater utilities to address infiltration and inflow issues in a cost-effective manner. It will also help to extend the service lives of both drinking water and wastewater mains. This research effort involved collecting case studies on the use of various trenchless pipeline renewal methods and providing the information in an online searchable database. The overall objective was to further support technology transfer and information sharing regarding emerging and innovative renewal technologies for water and wastewater mains. The result of this research is a Web-based, searchable database that utility personnel can use to obtain technology performance and cost data, as well as case study references. The renewal case studies include: technologies used; the conditions under which the technology was implemented; costs; lessons learned; and utility contact information. The online database also features a data mining tool for automated review of the technologies selected and cost data. Based on a review of the case study results and industry data, several findings are presented on tren
Estimating procedure for major highway construction bid item cost : final report.
DOT National Transportation Integrated Search
1978-06-01
The present procedure for estimating construction bid item cost makes use of the quarterly weighted average unit price report coupled with engineering judgement. The limitation to this method is that this report format provides only the lowest bid da...
Cost-effectiveness of surgical decompression for space-occupying hemispheric infarction.
Hofmeijer, Jeannette; van der Worp, H Bart; Kappelle, L Jaap; Eshuis, Sara; Algra, Ale; Greving, Jacoba P
2013-10-01
Surgical decompression reduces mortality and increases the probability of a favorable functional outcome after space-occupying hemispheric infarction. Its cost-effectiveness is uncertain. We assessed clinical outcomes, costs, and cost-effectiveness for the first 3 years in patients who were randomized to surgical decompression or best medical treatment within 48 hours after symptom onset in the Hemicraniectomy After Middle Cerebral Artery Infarction With Life-Threatening Edema Trial (HAMLET). Data on medical consumption were derived from case record files, hospital charts, and general practitioners. We calculated costs per quality-adjusted life year (QALY). Uncertainty was assessed with bootstrapping. A Markov model was constructed to estimate costs and health outcomes after 3 years. Of 39 patients enrolled within 48 hours, 21 were randomized to surgical decompression. After 3 years, 5 surgical (24%) and 14 medical patients (78%) had died. In the first 3 years after enrollment, operated patients had more QALYs than medically treated patients (mean difference, 1.0 QALY [95% confidence interval, 0.6-1.4]), but at higher costs (mean difference, €127,000 [95% confidence interval, 73,100-181,000]), indicating incremental costs of €127,000 per QALY gained. Ninety-eight percent of incremental cost-effectiveness ratios replicated by bootstrapping were >€80,000 per QALY gained. Markov modeling suggested costs of ≈€60,000 per QALY gained for a patient's lifetime. Surgical decompression for space-occupying infarction results in an increase in QALYs, but at very high costs. http://www.controlled-trials.com. Unique identifier: ISRCTN94237756.
DOT National Transportation Integrated Search
1990-03-01
This report covers the installation of two Self-Restoring Barrier (SERB) guardrails on Interstate-5 south of Ashland Oregon. The SERB design was developed to reduce repair cost and increase safety when compared to conventional barriers. This is accom...
Transitioning to High Performance Homes: Successes and Lessons Learned From Seven Builders
DOE Office of Scientific and Technical Information (OSTI.GOV)
Widder, Sarah H.; Kora, Angela R.; Baechler, Michael C.
2013-03-01
As homebuyers are becoming increasingly concerned about rising energy costs and the impact of fossil fuels as a major source of greenhouse gases, the returning new home market is beginning to demand energy-efficient and comfortable high-performance homes. In response to this, some innovative builders are gaining market share because they are able to market their homes’ comfort, better indoor air quality, and aesthetics, in addition to energy efficiency. The success and marketability of these high-performance homes is creating a builder demand for house plans and information about how to design, build, and sell their own low-energy homes. To help makemore » these and other builders more successful in the transition to high-performance construction techniques, Pacific Northwest National Laboratory (PNNL) partnered with seven interested builders in the hot humid and mixed humid climates to provide technical and design assistance through two building science firms, Florida Home Energy and Resources Organization (FL HERO) and Calcs-Plus, and a designer that offers a line of stock plans designed specifically for energy efficiency, called Energy Smart Home Plans (ESHP). This report summarizes the findings of research on cost-effective high-performance whole-house solutions, focusing on real-world implementation and challenges and identifying effective solutions. The ensuing sections provide project background, profile each of the builders who participated in the program, and describe their houses’ construction characteristics, key challenges the builders encountered during the construction and transaction process); and present primary lessons learned to be applied to future projects. As a result of this technical assistance, 17 homes have been built featuring climate-appropriate efficient envelopes, ducts in conditioned space, and correctly sized and controlled heating, ventilation, and air-conditioning systems. In addition, most builders intend to integrate high-performance features into most or all their homes in the future. As these seven builders have demonstrated, affordable, high-performance homes are possible, but require attention to detail and flexibility in design to accommodate specific regional geographic or market-driven constraints that can increase cost. With better information regarding how energy-efficiency trade-offs or design choices affect overall home performance, builders can make informed decisions regarding home design and construction to minimize cost without sacrificing performance and energy savings.« less
Fuel weight and removal costs in fuel-break construction
James L. Murphy
1966-01-01
Three major fuel types were sampled during fuel-break construction on the west side of the Sierra Nevada, California. Fuel weight per acre ranged from 12.2. to 420.6 tons per acre on average. Fuel-break construction removed 27.9 to 40.5 percent of teh total fuel; costs ranged from $141.29 to $148.38 per acre and $1.16 to $4.43 per ton.
1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.
1981-02-02
7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of
Prioritizing prevention opportunities in the Washington State construction industry, 2003-2007.
Schoonover, Todd; Bonauto, David; Silverstein, Barbara; Adams, Darrin; Clark, Randy
2010-06-01
This study compares construction industry groups in Washington State by injury severity and cost, and ranks industry groups according to potential for prevention. All Washington State workers' compensation compensable claims with date of injury between 2003 and 2007 were classified into North American Industrial Classification System (NAICS) industry groups. Claims were then aggregated by injury type and industry groups were ranked according to a prevention index (PI). The PI is the average of the rank orders of the claim count and the claim incidence rate. A lower PI indicates a higher need for prevention activities. The severity rate was calculated as the number of days of time loss per 10,000 full-time equivalents (FTEs). For all injury types, construction industry groups occupy 7 of the top 15 PI ranks in Washington State. The severity rate among construction industry groups was twice that for non-construction groups for all injury types. Foundation, structure, and building exterior contractors (NAICS 2381) ranked highest in prevention potential and severity among construction industry groups for most common injury types including falls from elevation, fall on same level, struck by/against, and musculo-skeletal disorders of the neck, back, and upper extremity (WMSDs). Median claim costs by injury type were generally higher among construction industry groups. The construction industry in Washington State has a high severity rate and potential for prevention. The methods used for characterizing these industry groups can be adapted for comparison within and between other industries and states. These data can be used by industry groups and employers to identify higher cost and higher severity injury types. Knowledge about the relative frequencies and costs associated with different injury types will help employers and construction industry associations make better informed decisions about where prevention efforts are most needed and may have the greatest impact. The results of this study can also be used by industry stakeholders to cooperatively focus on high cost and high severity injuries and explore best practices, interventions, and solutions as demonstrated by efforts to prevent musculoskeletal disorders in masonry (Entzel, Albers, & Welch, 2007). Initiating construction industry groups to focus on high cost and high severity injuries may also help prevent other types of injuries. (c) 2010 National Safety Council. Published by Elsevier Ltd. All rights reserved.
Determinants of escalating costs in low risk workers' compensation claims.
Bernacki, Edward J; Yuspeh, Larry; Tao, Xuguang
2007-07-01
To identify and quantify attributes that lead to unanticipated cost escalation in workers' compensation claims. We constructed four claim categories: low initial reserve/low cost, migrated catastrophic (low initial reserve/high cost), high initial reserve/low cost, and catastrophic (high initial reserve/high cost). To assess the attributes associated with the increased cost of migrated catastrophic claims, we analyzed 36,329 Louisiana workers' compensation claims in the four categories over a 5-year period. In the 729 claims initially thought to be low-cost claims (migrated catastrophic), the most significant predictors for cost escalation were attorney involvement and claim duration, followed by low back disorder, married/single/divorced status, male gender, small company size, high premium, reporting delays, and older age. These injuries accounted for 2% of all claims but 32.3% of the costs. Accelerated escalation of costs occurred late in the claim cycle (2 years). Certain attributes, particularly attorney involvement and claim duration, are associated with unanticipated cost escalation in a small number of claims that drastically affect overall losses. The results of this study suggest that these cases may be identified and addressed before rapid escalation occurs.
Cost-effectiveness of modern radiotherapy techniques in locally advanced pancreatic cancer.
Murphy, James D; Chang, Daniel T; Abelson, Jon; Daly, Megan E; Yeung, Heidi N; Nelson, Lorene M; Koong, Albert C
2012-02-15
Radiotherapy may improve the outcome of patients with pancreatic cancer but at an increased cost. In this study, the authors evaluated the cost-effectiveness of modern radiotherapy techniques in the treatment of locally advanced pancreatic cancer. A Markov decision-analytic model was constructed to compare the cost-effectiveness of 4 treatment regimens: gemcitabine alone, gemcitabine plus conventional radiotherapy, gemcitabine plus intensity-modulated radiotherapy (IMRT); and gemcitabine with stereotactic body radiotherapy (SBRT). Patients transitioned between the following 5 health states: stable disease, local progression, distant failure, local and distant failure, and death. Health utility tolls were assessed for radiotherapy and chemotherapy treatments and for radiation toxicity. SBRT increased life expectancy by 0.20 quality-adjusted life years (QALY) at an increased cost of $13,700 compared with gemcitabine alone (incremental cost-effectiveness ratio [ICER] = $69,500 per QALY). SBRT was more effective and less costly than conventional radiotherapy and IMRT. An analysis that excluded SBRT demonstrated that conventional radiotherapy had an ICER of $126,800 per QALY compared with gemcitabine alone, and IMRT had an ICER of $1,584,100 per QALY compared with conventional radiotherapy. A probabilistic sensitivity analysis demonstrated that the probability of cost-effectiveness at a willingness to pay of $50,000 per QALY was 78% for gemcitabine alone, 21% for SBRT, 1.4% for conventional radiotherapy, and 0.01% for IMRT. At a willingness to pay of $200,000 per QALY, the probability of cost-effectiveness was 73% for SBRT, 20% for conventional radiotherapy, 7% for gemcitabine alone, and 0.7% for IMRT. The current results indicated that IMRT in locally advanced pancreatic cancer exceeds what society considers cost-effective. In contrast, combining gemcitabine with SBRT increased clinical effectiveness beyond that of gemcitabine alone at a cost potentially acceptable by today's standards. Copyright © 2011 American Cancer Society.
Modular solar food dryers for farm use
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.J. Jr.; Coleman, R.L.; Berry, R.E.
1981-01-01
Several solar food dryer modules have been constructed. Their design has been based on a low-cost, small-scale solar dryer using a unique parabolic reflector construction to increase radiation on the drying surface. Each module has a drying surface of 1.1 M/sup 2/ and a parabolic reflector area of 3.3 M/sup 2/. Some modules are being used to dry mango slices (a potential new food product) for market testing, while others are used for experiments to improve drying efficiency. A description is given of the operating conditions of the modules drying mango slices and the most effective modifications.
Yiu, Nicole S N; Sze, N N; Chan, Daniel W M
2018-02-01
In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.
Performance and cost evaluation of constructed wetland for domestic waste water treatment.
Deeptha, V T; Sudarsan, J S; Baskar, G
2015-09-01
Root zone treatment through constructed wetlands is an engineered method of purifying wastewater. The aim of the present research was to study the potential of wetland plants Phragmites and Typha in treatment of wastewater and to compare the cost of constructed wetlands with that of conventional treatment systems. A pilot wetland unit of size 2x1x0.9 m was constructed in the campus. 3x3 rows of plants were transplanted into the pilot unit and subjected to wastewater from the hostels and other campus buildings. The raw wastewater and treated wastewater were collected periodically and tested for Total nitrogen (TN),Total Phosphorous (TP), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD). It was observed that this pilot unit reduced the concentrations of TN, TP, BOD and COD by 76, 73, 83 and 86%, respectively, on an average. Root zone system achieved standards for tertiary treatment with low operating costs, low maintenance costs, enhance the landscape, provide a natural habitat for birds, and did not emit any odour.
Tam, Vivian W Y; Tam, Leona; Le, Khoa N
2010-02-01
Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that "increasing overall business competitiveness and strategic business opportunities" was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while "rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations" was considered as the major benefit from Australian respondents. However, "lack of clients' support", "increase in management cost" and "increase in documentation workload, such as working documents, procedures and tools" were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, "inclusion of concrete recycling evaluation in tender appraisal" and "defining clear legal evaluation of concrete recycling" were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.
Higashi, Hideki; Truong, Khoa D; Barendregt, Jan J; Nguyen, Phuong K; Vuong, Mai L; Nguyen, Thuy T; Hoang, Phuong T; Wallace, Angela L; Tran, Tien V; Le, Cuong Q; Doran, Christopher M
2011-05-01
Tobacco smoking is one of the leading public health problems in the world. It is also possible to prevent and/or reduce the harm from tobacco use through the use of cost-effective tobacco control measures. However, most of this evidence comes from developed countries and little research has been conducted on this issue in developing countries. The objective of this study was to analyse the cost effectiveness of four population-level tobacco control interventions in Vietnam. Four tobacco control interventions were evaluated: excise tax increase; graphic warning labels on cigarette packs; mass media campaigns; and smoking bans (in public or in work places). A multi-state life table model was constructed in Microsoft® Excel to examine the cost effectiveness of the tobacco control intervention options. A government perspective was adopted, with costing conducted using a bottom-up approach. Health improvement was considered in terms of disability-adjusted life-years (DALYs) averted. All assumptions were subject to sensitivity and uncertainty analysis. All the interventions fell within the definition of being very cost effective according to the threshold level suggested by the WHO (i.e.
Recycling of construction debris as aggregate in the Mid-Atlantic Region, USA
Robinson, G.R.; Menzie, W.D.; Hyun, H.
2004-01-01
Reclaimed asphalt pavement (RAP) and portland cement concrete (RPCC) are abundant and available substitutes for natural aggregate in many areas. This paper presents an overview of factors that affect recycled aggregate cost, availability, and engineering performance, and the results of a survey of business practices in the Mid-Atlantic region. For RAP, processing costs are less than those for virgin natural aggregate. Use of efficient asphalt pavement stripping technology, on-site reclamation, and linked two-way transport of asphalt debris and processed asphalt paving mix between asphalt mix plants and paving sites has led to extensive recycling of asphalt pavement in the Mid-Atlantic region of the US. Most of the sites that recycle asphalt pavement (RAP) are located in or near urban areas close to important transportation corridors. RPCC is a viable aggregate source in urban settings where unit costs for processed aggregate from RPCC and natural aggregate are comparable. Disposal fees charged at RPCC recycling sites help defray processing costs and the significantly lower tipping fees at recycling sites versus landfill disposal sites encourage recycling of construction debris as aggregate. Construction contractors and construction debris recycling centers, many of which have the ability to crush and process concrete debris at the job site, produce most RPCC. Production of RPCC aggregate from construction debris that is processed on site using portable equipment moved to the construction site eliminates transportation costs for aggregate and provides an economic incentive for RPCC use. Processing costs, quality and performance issues, and lack of large quantities where needed limit RPCC use. Most RPCC suppliers in the Mid-Atlantic area are located in counties with population densities greater than 400 people/km2 (1036 people/mile2) and that have high unit-value costs and limited local availability of natural aggregate. ?? 2004 Published by Elsevier B.V.
Construction Management Meets Today's Realities.
ERIC Educational Resources Information Center
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
NASA Astrophysics Data System (ADS)
Tarmizi, H. B.; Daulay, M.; Muda, I.
2017-03-01
This study aims to test the aggregation of the economic growth of North Sumatra and the influence of the Tax on Acquisition of Land and Building to the Construction Cost Index in North Sumatra. This type of research is explanatory survey with quantitative methods. The population and the sample district in North Sumatra with the observation time series and cross sectional. The analysis tool used is multiple regression. The results showed that there was economic growth aggregation of North Sumatra and the influence of the Tax on Acquisition of Land and Building affect the Construction Cost Index.
Study and evaluation of ferro-cement for use in wind tunnel construction
NASA Technical Reports Server (NTRS)
Larsen, H. J., Jr. (Compiler)
1972-01-01
The structural suitability and cost effectiveness of ferro-cement for large subsonic wind tunnel structures is investigated. This investigation was carried out in the following four main categories: (1) a state-of-the-art survey into the uses, properties, and costs of ferro-cement; (2) an evaluation of those ferro-cement properties critical to construction of large, subsonic wind tunnels, which have not been adequately established to date; (3) a laboratory testing program to determine preliminary values for those properties; and (4) a study to establish cost factors for ferro-cement as related to a preliminary construction scheme for a nacelle and shroud unit.
Impact of ICT on Performance of Construction Companies in Slovakia
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
Information and communication technologies became a part of management tools in modern companies. Construction industry and its participants deal with a serious requirement for processing the huge amount of information on construction projects including design, construction, time and cost parameters, economic efficiency and sustainability. To fulfil this requirement, companies have to use appropriate ICT tools. Aim of the paper is to examine the impact of ICT exploitation on performance of construction companies. The impact of BIM tools, ERP systems and controlling system on cost and profit indicators will be measured on the sample of 85 companies from construction industry in Slovakia. Enterprise size, enterprise ownership and role in construction process will be set as independent variables for statistical analyse. The results will be considered for different groups of companies.
Technical considerations for designing low-cost, long-wave infrared objectives
NASA Astrophysics Data System (ADS)
Desroches, Gerard; Dalzell, Kristy; Robitaille, Blaise
2014-06-01
With the growth of uncooled infrared imaging in the consumer market, the balance between cost implications and performance criteria in the objective lens must be examined carefully. The increased availability of consumer-grade, long-wave infrared cameras is related to a decrease in military usage but it is also due to the decreasing costs of the cameras themselves. This has also driven up demand for low-cost, long-wave objectives that can resolve smaller pixels while maintaining high performance. Smaller pixels are traditionally associated with high cost objectives because of higher resolution requirements but, with careful consideration of all the requirements and proper selection of materials, costs can be moderated. This paper examines the cost/performance trade-off implications associated with optical and mechanical requirements of long-wave infrared objectives. Optical performance, f-number, field of view, distortion, focus range and thermal range all affect the cost of the objective. Because raw lens material cost is often the most expensive item in the construction, selection of the material as well as the shape of the lens while maintaining acceptable performance and cost targets were explored. As a result of these considerations, a low-cost, lightweight, well-performing objective was successfully designed, manufactured and tested.
Bridging the Silos of Service Delivery for High-Need, High-Cost Individuals.
Sherry, Melissa; Wolff, Jennifer L; Ballreich, Jeromie; DuGoff, Eva; Davis, Karen; Anderson, Gerard
2016-12-01
Health care reform efforts that emphasize value have increased awareness of the importance of nonmedical factors in achieving better care, better health, and lower costs in the care of high-need, high-cost individuals. Programs that care for socioeconomically disadvantaged, high-need, high-cost individuals have achieved promising results in part by bridging traditional service delivery silos. This study examined 5 innovative community-oriented programs that are successfully coordinating medical and nonmedical services to identify factors that stimulate and sustain community-level collaboration and coordinated care across silos of health care, public health, and social services delivery. The authors constructed a conceptual framework depicting community health systems that highlights 4 foundational factors that facilitate community-oriented collaboration: flexible financing, shared leadership, shared data, and a strong shared vision of commitment toward delivery of person-centered care.
13 CFR 120.884 - Ineligible costs for 504 loans.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Construction equipment (except for heavy duty construction equipment integral to a business' operations and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Ineligible costs for 504 loans. 120.884 Section 120.884 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS...
Efficient Solutions for New Homes Case Study: Savannah Gardens
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-03-15
The Savannah Housing Department is leading sustainable and affordable housing development in Georgia. It partnered with Southface Energy Institute, a member of the U.S. Department of Energy’s Partnership for Home Innovation Building America research team, to seek cost-effective solutions for increasing the energy efficiency of the Savannah Housing Department’s standard single-family home plans in the Savannah Gardens Community. Based on engineering, cost, and constructability analyses, the combined research team chose to pilot two technologies to evaluate efficiency and comfort impacts for homeowners: a heat-pump water heater in an encapsulated attic and an insulated exterior wall sheathing.
NASA Innovation Builds Better Nanotubes
NASA Technical Reports Server (NTRS)
2008-01-01
Nanotailor Inc., based in Austin, Texas, licensed Goddard Space Flight Center's unique single-walled carbon nanotube (SWCNT) fabrication process with plans to make high-quality, low-cost SWCNTs available commercially. Carbon nanotubes are being used in a wide variety of applications, and NASA's improved production method will increase their applicability in medicine, microelectronics, advanced materials, and molecular containment. Nanotailor built and tested a prototype based on Goddard's process, and is using this technique to lower the cost and improve the integrity of nanotubes, offering a better product for use in biomaterials, advanced materials, space exploration, highway and building construction, and many other applications.
NASA Astrophysics Data System (ADS)
Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris
2018-05-01
Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
Cost Analysis of Leed Certified United States Navy Buildings
2011-08-03
be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding
NASA Astrophysics Data System (ADS)
Ramli, Nor Azlinda; Abdullah, Che Sobry; Nawi, Mohd Nasrun Mohd; Bahaudin, Ahmad Yusni
2016-08-01
This study addresses the factors that influence the adoption of load-bearing masonry (LBM) system. A case study of the load-bearing masonry (LBM) system adoption is conducted through an interview to explore the situation of the technology adoption in a construction company. The finding indicates the factors influence the adoption of LBM system for the construction company are: organizational resources, usefulness, less maintenance, reduce construction time and cost. From the findings, these factors consistent with previous literature. Furthermore, the performance of the company was measured by looking into the financial and non-financial aspects. The LBM system brings good performance as it increased the profits of the company, a good quality of product and attracts more demand from customers. Thus, these factors should be considered for the other companies that are interested in implementing the LBM system in their projects.
75 FR 1403 - Notice of Proposed Information Collection for 1004-0102
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... to pay private landowners for the use and/or maintenance of their roads. These fees represent the BLM's share of road construction and maintenance costs under reciprocal right-of-way agreements between... contract, and to amortize road construction and maintenance costs among several road users. Frequency of...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Army ants dynamically adjust living bridges in response to a cost-benefit trade-off.
Reid, Chris R; Lutz, Matthew J; Powell, Scott; Kao, Albert B; Couzin, Iain D; Garnier, Simon
2015-12-08
The ability of individual animals to create functional structures by joining together is rare and confined to the social insects. Army ants (Eciton) form collective assemblages out of their own bodies to perform a variety of functions that benefit the entire colony. Here we examine ‟bridges" of linked individuals that are constructed to span gaps in the colony's foraging trail. How these living structures adjust themselves to varied and changing conditions remains poorly understood. Our field experiments show that the ants continuously modify their bridges, such that these structures lengthen, widen, and change position in response to traffic levels and environmental geometry. Ants initiate bridges where their path deviates from their incoming direction and move the bridges over time to create shortcuts over large gaps. The final position of the structure depended on the intensity of the traffic and the extent of path deviation and was influenced by a cost-benefit trade-off at the colony level, where the benefit of increased foraging trail efficiency was balanced by the cost of removing workers from the foraging pool to form the structure. To examine this trade-off, we quantified the geometric relationship between costs and benefits revealed by our experiments. We then constructed a model to determine the bridge location that maximized foraging rate, which qualitatively matched the observed movement of bridges. Our results highlight how animal self-assemblages can be dynamically modified in response to a group-level cost-benefit trade-off, without any individual unit's having information on global benefits or costs.
Groeneveld, Iris F; Proper, Karin I; van der Beek, Allard J; van Duivenbooden, Cor; van Mechelen, Willem
2008-01-01
Background Of all workers in Dutch construction industry, 20% has an elevated risk of cardiovascular disease (CVD). A major risk factor for CVD risk is an unhealthy lifestyle. The aim of our study is to design a lifestyle intervention for construction workers with an elevated CVD risk, and to evaluate its (cost-) effectiveness. Methods/Design In a RCT, 692 participants will be randomised to either the control or the intervention group. The control group will receive usual care. For the intervention group, a lifestyle intervention has been designed based on interviews and current literature. The intervention will last 6 months and will comprise 3 face-to-face and 4 telephone contacts, consisting of individual counselling aimed at increasing daily physical activity (PA) and improving dietary behaviour, and/or smoking cessation. Counselling will take place at the Occupational Health Service (OHS), and will be done according to motivational interviewing (MI). Additional written information about healthy lifestyle will also be provided to those in the intervention group. At baseline, after 6 and after 12 months, measurements will take place. Primary outcome variables will be the lifestyle behaviours of concern, i.e. daily PA, dietary intake, and smoking status. Secondary outcome variables will be body mass index (BMI), systolic and diastolic blood pressure, total and HDL blood cholesterol, Hba1c and cardio-respiratory fitness (CRF). Sickness absenteeism and cost-effectiveness will be assessed as well. Multilevel analysis will be performed to compare all outcome measures between the intervention group and the control group. Discussion By improving lifestyle, CVD risk may be lowered, yielding benefits for both employee and employer. If proven effective, this lifestyle intervention will be implemented on a larger scale within the Occupational Health Services in construction industry. Trial registration Current Controlled Trials ISRCTN60545588 PMID:18173844
Title I preliminary engineering for: A. S. E. F. solid waste to methane gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-01-01
An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less
Lu, Miaojia; Cheung, Clara Man; Li, Heng; Hsu, Shu-Chien
2016-09-01
The construction industry in Hong Kong increased its safety investment by 300% in the past two decades; however, its accident rate has plateaued to around 50% for one decade. Against this backdrop, researchers have found inconclusive results on the causal relationship between safety investment and safety performance. Using agent-based modeling, this study takes an unconventional bottom-up approach to study safety performance on a construction site as an outcome of a complex system defined by interactions among a worksite, individual construction workers, and different safety investments. Instead of focusing on finding the absolute relationship between safety investment and safety performance, this study contributes to providing a practical framework to investigate how different safety investments interacting with different parameters such as human and environmental factors could affect safety performance. As a result, we could identify cost-effective safety investments under different construction scenarios for delivering optimal safety performance. Copyright © 2016 Elsevier Ltd. All rights reserved.
Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid
2018-06-01
This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.
Cost-effectiveness of pharmacist-participated warfarin therapy management in Thailand.
Saokaew, Surasak; Permsuwan, Unchalee; Chaiyakunapruk, Nathorn; Nathisuwan, Surakit; Sukonthasarn, Apichard; Jeanpeerapong, Napawan
2013-10-01
Although pharmacist-participated warfarin therapy management (PWTM) is well established, the economic evaluation of PWTM is still lacking particularly in Asia-Pacific region. The objective of this study was to estimate the cost-effectiveness of PWTM in Thailand using local data where available. A Markov model was used to compare lifetime costs and quality-adjusted life years (QALYs) accrued to patients receiving warfarin therapy through PWTM or usual care (UC). The model was populated with relevant information from both health care system and societal perspectives. Input data were obtained from literatures and database analyses. Incremental cost-effectiveness ratios (ICERs) were presented as year 2012 values. A base-case analysis was performed for patients at age 45 years old. Sensitivity analyses including one-way and probabilistic sensitivity analyses were constructed to determine the robustness of the findings. From societal perspective, PWTM and UC results in 39.5 and 38.7 QALY, respectively. Thus, PWTM increase QALY by 0.79, and increase costs by 92,491 THB (3,083 USD) compared with UC (ICER 116,468 THB [3,882.3 USD] per QALY gained). While, from health care system perspective, PWTM also results in 0.79 QALY, and increase costs by 92,788 THB (3,093 USD) compared with UC (ICER 116,842 THB [3,894.7 USD] per QALY gained). Thus, PWTM was cost-effective compared with usual care, assuming willingness-to-pay (WTP) of 150,000 THB/QALY. Results were sensitive to the discount rate and cost of clinic set-up. Our finding suggests that PWTM is a cost-effective intervention. Policy-makers may consider our finding as part of information in their decision-making for implementing this strategy into healthcare benefit package. Further updates when additional data available are needed. © 2013.
R.O. Curtis; A.B. Carey
1996-01-01
The Douglas-fir region of western Washington and Oregon and coastal British Columbia contains the most productive forestlands in North America. Yet disagreement among user groups and conflicting goals, policies, and laws have nearly paralyzed timber management on federal lands and greatly increased costs and complexity of management on nonfederal lands. Constructive...
Juggling the Costs of Campus "Amenities" when Students Help Decide What to Spend
ERIC Educational Resources Information Center
Gose, Ben
2006-01-01
Students at many public universities often have a substantial say in what they will pay for the construction of non-academic facilities usually through referenda in which they vote to enact fees to cover the debt service on the building. However, some students are reluctant to vote in any new fee, given that tuition regularly increases at…
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
NASA Astrophysics Data System (ADS)
Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya
2017-12-01
Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Space Construction System Analysis. Part 2: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
A detailed, end-to-end analysis of the activities, techniques, equipment and Shuttle provisions required to construct a reference project system is described. Included are: platform definition; construction analysis; cost and programmatics; and space construction experiments concepts.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Assessing the cost of a cardiology residency program with a cost construction model.
Franzini, L; Chen, S C; McGhie, A I; Low, M D
1999-09-01
Although the total costs of graduate medical education are difficult to quantify, this information is of great importance in planning over the next decade. A cost construction model was used to quantify the costs of teaching faculty, cardiology fellows' salaries and benefits, overhead (physical plant, equipment, and support staff), and other costs associated with the cardiology residency program at the University of Texas-Houston during the 1996 to 1997 academic year. Surveys of cardiology faculty and fellows, checked by the program director, were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning cardiology fellows' productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The instructional cost of training (cost of didactic, direct clinical supervision, preparation for teaching, and teaching-related administration, plus the support of the teaching program) was estimated at $73,939 per cardiology fellow per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by cardiology fellows, $100,937 per cardiology fellow per year. Sensitivity analysis, with different assumptions on cardiology fellows' productivity and replacement costs, varied the cost estimates but generally represented the cardiology residency program as an asset. Cost construction models can be used as a tool to estimate variations in resource requirements resulting from changes in curriculum or educators' costs. In this residency, the value of the teaching and clinical services provided by cardiology fellows exceeded the cost of the resources used in the educational program.
Cost-effectiveness of optimizing acute stroke care services for thrombolysis.
Penaloza-Ramos, Maria Cristina; Sheppard, James P; Jowett, Sue; Barton, Pelham; Mant, Jonathan; Quinn, Tom; Mellor, Ruth M; Sims, Don; Sandler, David; McManus, Richard J
2014-02-01
Thrombolysis in acute stroke is effective up to 4.5 hours after symptom onset but relies on early recognition, prompt arrival in hospital, and timely brain scanning. This study aimed to establish the cost-effectiveness of increasing thrombolysis rates through a series of hypothetical change strategies designed to optimize the acute care pathway for stroke. A decision-tree model was constructed, which relates the acute management of patients with suspected stroke from symptom onset to outcome. Current practice was modeled and compared with 7 change strategies designed to facilitate wider eligibility for thrombolysis. The model basecase consisted of data from consenting patients following the acute stroke pathway recruited in participating hospitals with data on effectiveness of treatment and costs from published sources. All change strategies were cost saving while increasing quality-adjusted life years gained. Using realistic estimates of effectiveness, the change strategy with the largest potential benefit was that of better recording of onset time, which resulted in 3.3 additional quality-adjusted life years and a cost saving of US $46,000 per 100,000 population. All strategies increased the number of thrombolysed patients and the number requiring urgent brain imaging (by 9% to 21% dependent on the scenario). Assuming a willingness-to-pay of US $30,000 per quality-adjusted life year gained, the potential budget available to deliver the interventions in each strategy ranged from US $50,000 to US $144,000. These results suggest that any strategy that increases thrombolysis rates will result in cost savings and improved patient quality of life. Healthcare commissioners could consider this model when planning improvements in stroke care.
Bérard, A; Bréchat, P-H; Rymer, R; Londsdorfer, J
2009-02-01
According to the framework legislation promulgated as part of the reform of finance laws in France, quality is a mandatory feature of all governmental actions. In this context, this work was conducted to assess the construction cost of a national health program designed to promote physical and sports activities and prevent doping behaviors. This program was considered to have the characteristic features of a successful governmental health intervention. Four cost categories were evaluated: cost of the activity itself, transportation costs, communication costs and promotion costs. It was found that the program costs for 2002-2007 were 100,000 euro, with 15% of the costs in the communication category. Economic elements could be associated with factors of successful health service interventions in order to help decision makers responsible for the public interest and the consistency of public health actions.
Tan, Kelvin B; Toh, Song Tar; Guilleminault, Christian; Holty, Jon-Erik C
2015-04-15
Obstructive sleep apnea (OSA) is associated with increased cardiovascular morbidity and mortality. Conventional OSA therapy necessitates indefinite continuous positive airway pressure (CPAP). Although CPAP is an effective treatment modality, up to 50% of OSA patients are intolerant of CPAP. We explore whether surgical modalities developed for those intolerant of CPAP are cost-effective. We construct a lifetime semi-Markov model of OSA that accounts for observed increased risks of stroke, cardiovascular disease, and motor vehicle collisions for a 50-year-old male with untreated severe OSA. Using this model, we compare the cost-effectiveness of (1) no treatment, (2) CPAP only, and (3) CPAP followed by surgery (either palatopharyngeal reconstructive surgery [PPRS] or multilevel surgery [MLS]) for those intolerant to CPAP. Compared with the CPAP only strategy, CPAP followed by PPRS (CPAP-PPRS) adds 0.265 quality adjusted life years (QALYs) for an increase of $2,767 (discounted 2010 dollars) and is highly cost effective with an incremental cost-effectiveness ratio (ICER) of $10,421/QALY for a 50-year-old male with severe OSA. Compared to a CPAP-PPRS strategy, the CPAP-MLS strategy adds 0.07 QALYs at an increase of $6,213 for an ICER of $84,199/QALY. The CPAP-PPRS strategy appears cost-effective over a wide range of parameter estimates. Palatopharyngeal reconstructive surgery appears cost-effective in middle-aged men with severe OSA intolerant of CPAP. Further research is warranted to better define surgical candidacy as well as short-term and long-term surgical outcomes. A commentary on this article appears in this issue on page 509. © 2015 American Academy of Sleep Medicine.
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...
Devine, Kate; Mumford, Sunni L.; Goldman, Kara N.; Hodes-Wertz, Brooke; Druckenmiller, Sarah; Propst, Anthony M.; Noyes, Nicole
2015-01-01
Objective To determine whether oocyte cryopreservation (OC) for deferred reproduction is cost-effective per live birth using a model constructed from observed clinical practice. Design Decision-tree mathematical model with sensitivity analyses. Setting Not applicable. Patients A simulated cohort of women wishing to delay childbearing until age 40 years. Interventions Not applicable. Main Outcome Measure Cost per live birth. Results Our primary model predicted that OC at age 35 years by women planning to defer pregnancy attempts until age 40 would decrease cost per live birth to $39,946 (and increase odds of live birth to 62% by the end of the model),indicating OC to be a cost-effective strategy relative to forgoing OC, which was associated with a predicted cost per live birth of $55,060 (and 42% chance of live birth). If fresh autologous ART was added at age 40 prior to thawing oocytes, 74% obtained a live birth, though at an increased cost of $61,887. Separate sensitivity analyses demonstrated that OC remained cost-effective so long as patients underwent OC prior to age 38, more than 49% of those not obtaining a spontaneously conceived live birth returned to thaw oocytes, and likelihood of obtaining a spontaneously conceived live birth after six months’ attempts at age 40 was less than 35%. Conclusions In women who plan to delay childbearing until age 40, oocyte cryopreservation before 38 years of age reduces the cost to obtain a live birth. PMID:25813281
NASA Astrophysics Data System (ADS)
Basten, Van; Latief, Yusuf; Berawi, Mohammed Ali; Budiman, Rachmat; Riswanto
2017-03-01
Total completed building construction value in Indonesia increased 116% during 2009 to 2011. That's followed by increasing 11% energy consumption in Indonesia in the last three years with 70% energy met to the electricity needs of commercial building. In addition, a few application of green building concept in Indonesia made the greenhouse gas emissions or CO2 amount increased by 25%. Construction, operation, and maintain of building cost consider relatively high. The evaluation in this research is used to improve the building performance with some of green concept alternatives. The research methodology is conducted by combination of qualitative and quantitative approaches through interview and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment (LCA) Method. The result of optimization that is the largest efficiency and effective of building life cycle.
NASA Astrophysics Data System (ADS)
Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid
2017-10-01
One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
NASA Astrophysics Data System (ADS)
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
Quantitative evolutionary design
Diamond, Jared
2002-01-01
The field of quantitative evolutionary design uses evolutionary reasoning (in terms of natural selection and ultimate causation) to understand the magnitudes of biological reserve capacities, i.e. excesses of capacities over natural loads. Ratios of capacities to loads, defined as safety factors, fall in the range 1.2-10 for most engineered and biological components, even though engineered safety factors are specified intentionally by humans while biological safety factors arise through natural selection. Familiar examples of engineered safety factors include those of buildings, bridges and elevators (lifts), while biological examples include factors of bones and other structural elements, of enzymes and transporters, and of organ metabolic performances. Safety factors serve to minimize the overlap zone (resulting in performance failure) between the low tail of capacity distributions and the high tail of load distributions. Safety factors increase with coefficients of variation of load and capacity, with capacity deterioration with time, and with cost of failure, and decrease with costs of initial construction, maintenance, operation, and opportunity. Adaptive regulation of many biological systems involves capacity increases with increasing load; several quantitative examples suggest sublinear increases, such that safety factors decrease towards 1.0. Unsolved questions include safety factors of series systems, parallel or branched pathways, elements with multiple functions, enzyme reaction chains, and equilibrium enzymes. The modest sizes of safety factors imply the existence of costs that penalize excess capacities. Those costs are likely to involve wasted energy or space for large or expensive components, but opportunity costs of wasted space at the molecular level for minor components. PMID:12122135
Study of Subway Station Design and Construction
DOT National Transportation Integrated Search
1977-03-01
Due to the high cost of urban underground transit construction in recent years, construction practices used in other countries were reviewed to determine if construction methods which are commonly accepted there might be adapted to U.S. practice. Des...
Evaluation of the effects of nursery depopulation of the profitability of 34 pig farms.
Dee, S A; Joo, H S; Polson, D D; Marsh, W E
1997-05-10
The financial impact of nursery depopulation was assessed on 34 pig farms by constructing a partial budget model to measure the profitability of the nursery production. The model measured margin over variable cost and used production data generated from a previous study; it assumed that fixed costs remained constant throughout the study and that feed cost, weaned pig cost and market price per nursery pig also remained fixed. The mean margin over variable cost per sow on the 34 farm after nursery depopulation was Pounds 116. Thirty-two of the farms showed reductions in this cost, ranging from Pounds 20 to Pounds 408 per sow, in the 12 months after nursery depopulation compared with the previous 12 months. Of the two farms which did not show an increase in profitability, one showed no change and the other showed a net loss of Pounds 8 per sow. The sows' serostatus for porcine reproductive and respiratory syndrome virus infection was monitored but there was no significant difference between the margin over variable cost per sow of the seropositive (Pounds 130) and seronegative (Pounds 170) herds.
Mapping groundwater development costs for the transboundary Western Aquifer Basin, Palestine/Israel
NASA Astrophysics Data System (ADS)
MacDonald, A. M.; Ó Dochartaigh, B. É.; Calow, R. C.; Shalabi, Y.; Selah, K.; Merrett, S.
2009-11-01
The costs of developing groundwater in the Western Aquifer Basin vary considerably across the West Bank and Israel. One of the main reasons for this variability is the diverse hydrogeological conditions within the aquifer. Using data from recent hydrogeological investigations, an estimate of the variation of both the drilling and pumping costs was calculated and then mapped across the Upper and Lower Aquifers within the Western Aquifer Basin. These groundwater cost maps proved helpful in analyzing the impacts of hydrogeology on water supply, and also in communicating complex hydrogeological information to a broader audience. The maps clearly demonstrate that the most cost-effective area to develop groundwater is along the Green Line—the 1949 armistice boundary between Israel and the Palestinian West Bank. Any migration of this boundary eastwards will affect the cost and feasibility of developing groundwater within Palestine, making abstraction from the Upper Aquifer impracticable, and increasing the cost of developing the Lower Aquifer. Therefore, the separation wall, which is being constructed to the east of the Armistice Line in Palestinian territory, will significantly reduce the ability of the Palestinians to develop groundwater resources.
Gastric bypass is a cost-saving procedure: results from a comprehensive Markov model.
Faria, Gil R; Preto, John R; Costa-Maia, José
2013-04-01
Obesity is a growing public health problem in industrialized countries and is directly and indirectly responsible for almost 10% of all health expenditures. Bariatric surgery is the best available treatment, however, associated with important economical expenditures. So, cost-effectiveness analysis of the available surgical options is paramount. We developed a Markov model for three different strategies: best medical management, gastric band, and gastric bypass. The Markov model was constructed to allow for the evaluation of the impact of several obesity-related comorbidities. The results were derived for a representative population of morbidly obese patients, and subgroup analyses were performed for patients without comorbidities, patients with diabetes mellitus, different age, and body mass index (BMI) groups. Cost-effectiveness analysis was performed accounting for lifetime costs and from a societal perspective. Gastric bypass is a dominant strategy, rendering a significant decrease in lifetime costs and increase in quality-adjusted life years (QALYs). Comparing with the best medical management, in the global population of patients with a BMI of > 35 kg/m2, gastric bypass renders 1.9 extra QALYs and saves on average 13,244€ per patient. Younger patients, patients with a BMI between 40 and 50 kg/m2, and patients without obesity-related diseases are the ones with a bigger benefit in terms of cost effectiveness. Gastric bypass surgery increases quality-adjusted survival and saves resources to health systems. As such, it can be an important process to control the ever-increasing health expenditure.
Formation of costs of high-rise objects of housing and civil purpose based on enlarged norms
NASA Astrophysics Data System (ADS)
Vorotyntseva, Anna; Ovsiannikov, Andrei; Bolgov, Vladimir
2018-03-01
When determining the cost of capital construction objects, for purposes of pre-design workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.
Key issues for low-cost FGD installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
DePriest, W.; Mazurek, J.M.
1995-12-01
This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.
Academic Building Systems. A Technique to Maximize Control of Construction Costs.
ERIC Educational Resources Information Center
Clark, Donald H.
1972-01-01
Academic Building Systems (ABS) is an architectural planning and design method which allows the construction owner to respond to the need for less expensive structures, economically adaptable to the changing conditions of the academic world, by providing the owner with the maximum controls over the variable cost factors in educational facility…
Cost, production and effectiveness of masticated fireline.
Elizabeth Dodson; Dana Mitchell
2016-01-01
Fire managers are continuously looking for improved methods to construct fireline with minimal resource damage. One option for fireline construction that has so far received limited attention is the use of mastication equipment. This study evaluated a masticating disk mounted on a self-leveling feller- buncher for the cost, speed, and adherence to fireline...
Ground water contaminated with TCE is commonly treated with a passive reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative re...
EFFECTIVE REMOVAL OF TCE IN A LABORATORY MODEL OF A PRB CONSTRUCTED WITH PLANT MULCH
Ground water contaminated with TCE is commonly treated with a permeable reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative ...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2013 CFR
2013-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2011 CFR
2011-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2012 CFR
2012-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2014 CFR
2014-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
BMP COST ANALYSIS FOR SOURCE WATER PROTECTION
Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...
Code of Federal Regulations, 2014 CFR
2014-01-01
... applicable) acquisition costs, construction costs, and other costs capitalized in accordance with GAAP. (2... party); or claims reimbursement of actual interest cost at a rate available via such a transaction. (4) The non-Federal entity limits claims for Federal reimbursement of interest costs to the least...
The use of AlloDerm in postmastectomy alloplastic breast reconstruction: part II. A cost analysis.
Jansen, Leigh A; Macadam, Sheina A
2011-06-01
Increasingly, AlloDerm is being used in alloplastic breast reconstruction, and has been the subject of a recent systematic review. The authors' objective was to perform a cost analysis comparing direct-to-implant with AlloDerm reconstruction to two-stage non-AlloDerm reconstruction. Seven clinically important health outcomes and their probabilities for both types of reconstruction were derived from the recent review. A decision analytic model from the Canadian provincial payer's perspective was constructed based on these health states. Direct medical costs were estimated from a university-based hospital, yielding expected costs for direct-to-implant reconstruction with AlloDerm and two-stage non-AlloDerm reconstruction. Sensitivity analyses were conducted. Baseline and expected costs were calculated for direct-to-implant AlloDerm and two-stage non-AlloDerm reconstruction. Direct-to-implant reconstruction with AlloDerm was found to be less expensive in the baseline ($10,240 versus $10,584) and expected cost ($10,734 versus $11,251) using a 6 × 16-cm AlloDerm sheet. With a 6 × 12-cm sheet, expected cost falls to $9673. By increasing direct-to-implant operative time from 2 hours to 2.5 hours, expected cost rises to $11,784. If capsular contracture rate requiring revision is set at 15 percent for both procedures, expected costs are $10,926 and $11,251 for direct-to-implant and two-stage procedures, respectively. If the capsular contracture rate is lowered for either procedure, this has minimal impact on expected cost. Although AlloDerm is expensive, it appears to be cost-effective if used for direct-to-implant breast reconstruction. The methods used here may be extrapolated to different centers incorporating local costs and complication rates. A formal randomized controlled trial, including costs, is recommended.
Improved Cost-Base Design of Water Distribution Networks using Genetic Algorithm
NASA Astrophysics Data System (ADS)
Moradzadeh Azar, Foad; Abghari, Hirad; Taghi Alami, Mohammad; Weijs, Steven
2010-05-01
Population growth and progressive extension of urbanization in different places of Iran cause an increasing demand for primary needs. The water, this vital liquid is the most important natural need for human life. Providing this natural need is requires the design and construction of water distribution networks, that incur enormous costs on the country's budget. Any reduction in these costs enable more people from society to access extreme profit least cost. Therefore, investment of Municipal councils need to maximize benefits or minimize expenditures. To achieve this purpose, the engineering design depends on the cost optimization techniques. This paper, presents optimization models based on genetic algorithm(GA) to find out the minimum design cost Mahabad City's (North West, Iran) water distribution network. By designing two models and comparing the resulting costs, the abilities of GA were determined. the GA based model could find optimum pipe diameters to reduce the design costs of network. Results show that the water distribution network design using Genetic Algorithm could lead to reduction of at least 7% in project costs in comparison to the classic model. Keywords: Genetic Algorithm, Optimum Design of Water Distribution Network, Mahabad City, Iran.
Sedimentation and the Economics of Selecting an Optimum Reservoir Size
NASA Astrophysics Data System (ADS)
Miltz, David; White, David C.
1987-08-01
This paper attempts to develop an easily reproducible methodology for the economic selection of an optimal reservoir size given an annual sedimentation rate. The optimal capacity is that at which the marginal cost of constructing additional storage capacity is equal to the dredging costs avoided by having that additional capacity available to store sediment. The cost implications of misestimating dredging costs, construction costs, and sediment delivery rates are investigated. In general, it is shown that oversizing is a rational response to uncertainty in the estimation of parameters. The sensitivity of the results to alternative discount rates is also discussed. The theoretical discussion is illustrated with a case study drawn from Highland Silver Lake in southwestern Illinois.
Drawing Inspiration from Human Brain Networks: Construction of Interconnected Virtual Networks
Kominami, Daichi; Leibnitz, Kenji; Murata, Masayuki
2018-01-01
Virtualization of wireless sensor networks (WSN) is widely considered as a foundational block of edge/fog computing, which is a key technology that can help realize next-generation Internet of things (IoT) networks. In such scenarios, multiple IoT devices and service modules will be virtually deployed and interconnected over the Internet. Moreover, application services are expected to be more sophisticated and complex, thereby increasing the number of modifications required for the construction of network topologies. Therefore, it is imperative to establish a method for constructing a virtualized WSN (VWSN) topology that achieves low latency on information transmission and high resilience against network failures, while keeping the topological construction cost low. In this study, we draw inspiration from inter-modular connectivity in human brain networks, which achieves high performance when dealing with large-scale networks composed of a large number of modules (i.e., regions) and nodes (i.e., neurons). We propose a method for assigning inter-modular links based on a connectivity model observed in the cerebral cortex of the brain, known as the exponential distance rule (EDR) model. We then choose endpoint nodes of these links by controlling inter-modular assortativity, which characterizes the topological connectivity of brain networks. We test our proposed methods using simulation experiments. The results show that the proposed method based on the EDR model can construct a VWSN topology with an optimal combination of communication efficiency, robustness, and construction cost. Regarding the selection of endpoint nodes for the inter-modular links, the results also show that high assortativity enhances the robustness and communication efficiency because of the existence of inter-modular links of two high-degree nodes. PMID:29642483
Drawing Inspiration from Human Brain Networks: Construction of Interconnected Virtual Networks.
Murakami, Masaya; Kominami, Daichi; Leibnitz, Kenji; Murata, Masayuki
2018-04-08
Virtualization of wireless sensor networks (WSN) is widely considered as a foundational block of edge/fog computing, which is a key technology that can help realize next-generation Internet of things (IoT) networks. In such scenarios, multiple IoT devices and service modules will be virtually deployed and interconnected over the Internet. Moreover, application services are expected to be more sophisticated and complex, thereby increasing the number of modifications required for the construction of network topologies. Therefore, it is imperative to establish a method for constructing a virtualized WSN (VWSN) topology that achieves low latency on information transmission and high resilience against network failures, while keeping the topological construction cost low. In this study, we draw inspiration from inter-modular connectivity in human brain networks, which achieves high performance when dealing with large-scale networks composed of a large number of modules (i.e., regions) and nodes (i.e., neurons). We propose a method for assigning inter-modular links based on a connectivity model observed in the cerebral cortex of the brain, known as the exponential distance rule (EDR) model. We then choose endpoint nodes of these links by controlling inter-modular assortativity, which characterizes the topological connectivity of brain networks. We test our proposed methods using simulation experiments. The results show that the proposed method based on the EDR model can construct a VWSN topology with an optimal combination of communication efficiency, robustness, and construction cost. Regarding the selection of endpoint nodes for the inter-modular links, the results also show that high assortativity enhances the robustness and communication efficiency because of the existence of inter-modular links of two high-degree nodes.
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2011 CFR
2011-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2014 CFR
2014-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2013 CFR
2013-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2010 CFR
2010-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
A Departmental Cost-Effectiveness Model.
ERIC Educational Resources Information Center
Holleman, Thomas, Jr.
In establishing a departmental cost-effectiveness model, the traditional cost-effectiveness model was discussed and equipped with a distant and deflation equation for both benefits and costs. Next, the economics of costing was examined and program costing procedures developed. Then, the model construct was described as it was structured around the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.
Study on transport packages used for food freshness preservation based on thermal analysis
NASA Astrophysics Data System (ADS)
Yu, Ying
2016-12-01
In recent time, as the Chinese consumption level increases, the consumption quantity of high-value fruits, vegetables and seafood products have been increasing year by year. As a consequence, the traffic volume of refrigerated products also increases yearly and the popularization degree of the cold-chain transportation enhances. A low-temperature environment should be guaranteed during transportation, thus there is about 40% of diesel oil should be consumed by the refrigerating system and the cold-chain transportation becomes very costly. This study aimed to explore methods that could reduce the cost of transport packages of refrigerated products. On the basis of the heat transfer theory and the fluid mechanics theory, the heat exchanging process of corrugated cases during the operation of refrigerating system was analyzed, the heat transfer process of corrugated cases and refrigerator van was theoretically analyzed and the heat balance equation of corrugated cases was constructed.
NASA Astrophysics Data System (ADS)
Abdullahi Ahmad, Kabiru; Ezree Abdullah, Mohd; Hassan, Norhidayah Abdul; Usman, Nura; Hassan, Mohd Rosli Mohd; Bilema, Munder A. M.; Modibbo Saeed, Saeed; Batari, Ahmad
2018-04-01
Concerns about the cost, availability, and environmental impact of using petroleum-based materials have led to increased usage of reclaimed asphalt pavement (RAP). Mean-while, the demand of the road industry to decrease the energy consumptions and reduce the release of greenhouse gases as well as other harmful gases, which cause serious air pollution has increased due to the amount of energy consumed is a major component of pavement construction that significantly contributes to the total cost. This paper evaluates the effects of Biobased rejuvenator known as JCO on the required heat energy and the amount of CO2 produced to increase the temperature of RAP and virgin aggregates and one binder from 25C to the point of mixing. The results showed that incorporating Biobased rejuvenator (JCO) can potentially reduce the required heat energy and amount of greenhouse gas produced by RAP and virgin, respectively.
Delivering maximum clinical benefit at an affordable price: engaging stakeholders in cancer care.
Kelly, Ronan J; Smith, Thomas J
2014-03-01
Cancer costs continue to increase alarmingly despite much debate about how they can be reduced. The oncology community needs to take greater responsibility for our own practice patterns, especially when using expensive tests and treatments with marginal value: we cannot continue to accept novel therapeutics with very small benefits for exorbitant prices. Patients, payers, and pharmaceutical communities should be constructively engaged to communicate medically and economically possible goals, and eventually, to reduce use and costs. Diagnostic tests and treatments should have to show true value to be added to existing protocols. In this article, we discuss three key drivers of costs: end-of-life care patterns, medical imaging, and drugs. We propose health-care models that have the potential to decrease costs and discuss solutions to maintain clinical benefit at an affordable price. Copyright © 2014 Elsevier Ltd. All rights reserved.
Model of investment appraisal of high-rise construction with account of cost of land resources
NASA Astrophysics Data System (ADS)
Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya
2018-03-01
The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.
The Sampling Design of the China Family Panel Studies (CFPS)
Xie, Yu; Lu, Ping
2018-01-01
The China Family Panel Studies (CFPS) is an on-going, nearly nationwide, comprehensive, longitudinal social survey that is intended to serve research needs on a large variety of social phenomena in contemporary China. In this paper, we describe the sampling design of the CFPS sample for its 2010 baseline survey and methods for constructing weights to adjust for sampling design and survey nonresponses. Specifically, the CFPS used a multi-stage probability strategy to reduce operation costs and implicit stratification to increase efficiency. Respondents were oversampled in five provinces or administrative equivalents for regional comparisons. We provide operation details for both sampling and weights construction. PMID:29854418
Final environmental assessment: Sacramento Energy Service Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The Sacramento Area Office (SAO) of the Western Area Power Administration (Western) needs to increase the security of operations, to eliminate overcrowding at the current leased location of the existing facilities, to provide for future growth, to improve efficiency, and to reduce operating costs. The proposed action is to construct an approximate 40,000-square foot building and adjacent parking lot with a Solar Powered Electric Vehicle Charging Station installed to promote use of energy efficient transportation. As funding becomes available and technology develops, additional innovative energy-efficient measures will be incorporated into the building. For example the proposed construction of the Solarmore » Powered Electric Vehicle Charging.« less
24 CFR 242.15 - Limitation on refinancing existing indebtedness.
Code of Federal Regulations, 2013 CFR
2013-04-01
... section 242-insured loan; however, the hard costs of construction and equipment must represent at least 20... no requirement for hard costs. However, if there are hard costs, such costs must total less than 20...
24 CFR 242.15 - Limitation on refinancing existing indebtedness.
Code of Federal Regulations, 2014 CFR
2014-04-01
... section 242-insured loan; however, the hard costs of construction and equipment must represent at least 20... no requirement for hard costs. However, if there are hard costs, such costs must total less than 20...
Synthesis on construction unit cost development : technical report.
DOT National Transportation Integrated Search
2009-01-01
Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...
Yoo, Sooyoung; Cho, Minsu; Kim, Eunhye; Kim, Seok; Sim, Yerim; Yoo, Donghyun; Hwang, Hee; Song, Minseok
2016-04-01
Many hospitals are increasing their efforts to improve processes because processes play an important role in enhancing work efficiency and reducing costs. However, to date, a quantitative tool has not been available to examine the before and after effects of processes and environmental changes, other than the use of indirect indicators, such as mortality rate and readmission rate. This study used process mining technology to analyze process changes based on changes in the hospital environment, such as the construction of a new building, and to measure the effects of environmental changes in terms of consultation wait time, time spent per task, and outpatient care processes. Using process mining technology, electronic health record (EHR) log data of outpatient care before and after constructing a new building were analyzed, and the effectiveness of the technology in terms of the process was evaluated. Using the process mining technique, we found that the total time spent in outpatient care did not increase significantly compared to that before the construction of a new building, considering that the number of outpatients increased, and the consultation wait time decreased. These results suggest that the operation of the outpatient clinic was effective after changes were implemented in the hospital environment. We further identified improvements in processes using the process mining technique, thereby demonstrating the usefulness of this technique for analyzing complex hospital processes at a low cost. This study confirmed the effectiveness of process mining technology at an actual hospital site. In future studies, the use of process mining technology will be expanded by applying this approach to a larger variety of process change situations. Copyright © 2016. Published by Elsevier Ireland Ltd.