Sample records for construction costs operating

  1. Space construction system analysis. Part 2: Cost and programmatics

    NASA Technical Reports Server (NTRS)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  2. 25 CFR 700.467 - Construction costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  3. 25 CFR 700.467 - Construction costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  4. 25 CFR 700.467 - Construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  5. Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

  6. 75 FR 7411 - Schedule of Water Charges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...

  7. Visualizing the Invisible: The Construction of Three Low-Cost Schlieren Imaging Systems for the Undergraduate Laboratory

    ERIC Educational Resources Information Center

    Gopal, Venkatesh; Klosowiak, Julian L.; Jaeger, Robert; Selimkhanov, Timur; Hartmann, Mitra J. Z.

    2008-01-01

    We describe the construction and operation of three low-cost schlieren imaging systems that can be fabricated using surplus optics and 80/20, an aluminium extrusion based construction system. Each system has a different optical configuration. The low cost and ease of construction makes these systems highly suitable for high-school and…

  8. Cost Analysis of Leed Certified United States Navy Buildings

    DTIC Science & Technology

    2011-08-03

    be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding

  9. An analysis of short haul airline operating costs

    NASA Technical Reports Server (NTRS)

    Kanafani, A.; Taghavi, S.

    1975-01-01

    The demand and supply characteristics of short haul air transportation systems are investigated in terms of airline operating costs. Direct, indirect, and ground handling costs are included. Supply models of short haul air transportation systems are constructed.

  10. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  11. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  12. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  13. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  14. STANDARDIZED COSTS FOR WATER SUPPLY DISTRIBUTION SYSTEMS

    EPA Science Inventory

    Presented within the report are cost data for construction and operation/maintenance of domestic water distribution and transmission pipelines, domestic water pumping stations, and domestic water storage reservoirs. To allow comparison of new construction with rehabilitation of e...

  15. The 1988 Inland Waterway Review

    DTIC Science & Technology

    1988-11-01

    Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act

  16. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  17. PHENIX Work Breakdown Structure. Cost and schedule review copy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less

  18. Energy management guidelines for rail transit systems : volume I. final report

    DOT National Transportation Integrated Search

    1986-09-01

    The cost of electricity is a significant portion of the operating costs of rail transit systems. The impact of increasing energy costs is felt by those systems presently in operation and will be felt by those in the planning or construction phases. B...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less

  20. User costs as one of main advantages of precast concrete application in highway construction

    NASA Astrophysics Data System (ADS)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  1. NREL: News - New Design Tool Analyzes Cost of Operating a Building Over its

    Science.gov Websites

    Lifetime Analyzes Cost of Operating a Building Over its Lifetime Golden, Colo., August 2, 2002 taking into consideration such factors as the initial cost of construction, mortgage payments, annual supply their own cost estimates. "Energy-10 allows the user to play 'what if' games while designing

  2. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    NASA Astrophysics Data System (ADS)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  3. Study of short-haul aircraft operating economics. Phase 2: An analysis of the impact of jet modernization on local service airline operating costs

    NASA Technical Reports Server (NTRS)

    Andrastek, D. A.

    1976-01-01

    The objectives of this phase of the study were (1) to assess the 10 year operating cost trends of the local service airlines operating in the 1965 through 1974 period, (2) to glean from these trends the technological and operational parameters which were impacted most significantly by the transition to newer pure jet, short haul transports, and effected by changing fuel prices and cost of living indices, and (3) to develop, construct, and evaluate an operating cost forecasting model which would incorporate those factors which best predicted airline total operating cost behavior over that 10-year period.

  4. Cost-efficiency of highway operations and maintenance of public-private partnerships.

    DOT National Transportation Integrated Search

    2014-08-01

    While the literature on public-private partnerships (PPPs) argues that the private sectors life-cycle : approach to design and construction results in operational cost efficiencies, empirical support is : missing. This study explored that issue by...

  5. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    NASA Astrophysics Data System (ADS)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  6. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  7. Defense Base Realignment and Closure Budget Data for Naval Air Technical Training Center, Naval Air Station Pensacola, Florida

    DTIC Science & Technology

    1994-06-07

    023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to

  8. 13 CFR 120.884 - Ineligible costs for 504 loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Construction equipment (except for heavy duty construction equipment integral to a business' operations and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Ineligible costs for 504 loans. 120.884 Section 120.884 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS...

  9. Cost of phosphate removal in municipal wastewater treatment plants

    NASA Technical Reports Server (NTRS)

    Schuessler, H.

    1983-01-01

    Construction and operating costs of advanced wastewater treatment for phosphate removal at municipal wastewater treatment plants have been investigated on orders from the Federal Environmental Bureau in Berlin. Particular attention has been paid to applicable kinds of precipitants for pre-, simultaneous and post-precipitation as well as to different phosphate influent and effluent concentrations. The article offers detailed comments on determination of technical data, investments, capital costs, operating costs and annual costs as well as potential cost reductions resulting from precipitation. Selected results of the cost investigation are shown in graphical form as specific investments, operating and annual costs depending on wastewater flow.

  10. Simulation of tunneling construction methods of the Cisumdawu toll road

    NASA Astrophysics Data System (ADS)

    Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.

    2017-11-01

    Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.

  11. BMP COST ANALYSIS FOR SOURCE WATER PROTECTION

    EPA Science Inventory

    Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...

  12. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  13. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  14. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  15. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  16. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    NASA Astrophysics Data System (ADS)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  17. Spaceborne construction and operations planning - Decision rules for selecting EVA, telerobot, and combined work-systems

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.

    1992-01-01

    An approach is presented for selecting an appropriate work-system for performing construction and operations tasks by humans and telerobots. The decision to use extravehicular activity (EVA) performed by astronauts, extravehicular robotics (EVR), or a combination of EVA and EVR is determined by the ratio of the marginal costs of EVA, EVR, and IVA. The approach proposed here is useful for examining cost trade-offs between tasks and performing trade studies of task improvement techniques (human or telerobotic).

  18. Operation CASTLE. Report of the Manager Santa Fe Operations. Extracted Version.

    DTIC Science & Technology

    Nuclear explosion testing, *Test facilities, *Management planning and control, Pacific Ocean, Eniwetok Atoll, Bikini Atoll, Marshall Islands , Organizations, Construction, Operation, Management, Logistics support, Costs

  19. Optimizing and controlling earthmoving operations using spatial technologies

    NASA Astrophysics Data System (ADS)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.

  20. BMP COST ANALYSIS FOR SOURCE WATER PROTECTION

    EPA Science Inventory

    Cost equations are developed to estimate capital and operations and maintenance (O&M) for commonly used best management practices (BMPS). Total BMP volume and/or surface area is used to predict these costs. ENR construction cost index was used to adjust cost data to December 2000...

  1. 1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.

    DTIC Science & Technology

    1981-02-02

    7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of

  2. Environmental trade-offs of tunnels vs cut-and-cover subways

    USGS Publications Warehouse

    Walton, M.

    1978-01-01

    Heavy construction projects in cities entail two kinds of cost - internal cost, which can be defined in terms of payments from one set of parties to another, and external cost, which is the cost borne by the community at large as the result of disutilities entailed in construction and operation. Environmental trade-offs involve external costs, which are commonly difficult to measure. Cut-and-cover subway construction probably entails higher external and internal cost than deep tunnel construction in many urban geological environments, but uncertainty concerning the costs and environmental trade-offs of tunneling leads to limited and timid use of tunneling by American designers. Thus uncertainty becomes a major trade-off which works against tunneling. The reverse is true in Sweden after nearly 30 years of subway construction. Econometric methods for measuring external costs exist in principle, but are limited in application. Economic theory based on market pressure does not address the real problem of urban environmental trade-offs. Nevertheless, the problem of uncertainty can be addressed by comparative studies of estimated and as-built costs of cut-and-cover vs tunnel projects and a review of environmental issues associated with such construction. Such a study would benefit the underground construction industry and the design of transportation systems. It would also help solve an aspect of the urban problem. ?? 1978.

  3. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  4. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  5. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  6. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  7. The Application of Architecture Frameworks to Modelling Exploration Operations Costs

    NASA Technical Reports Server (NTRS)

    Shishko, Robert

    2006-01-01

    Developments in architectural frameworks and system-of-systems thinking have provided useful constructs for systems engineering. DoDAF concepts, language, and formalisms, in particular, provide a natural way of conceptualizing an operations cost model applicable to NASA's space exploration vision. Not all DoDAF products have meaning or apply to a DoDAF inspired operations cost model, but this paper describes how such DoDAF concepts as nodes, systems, and operational activities relate to the development of a model to estimate exploration operations costs. The paper discusses the specific implementation to the Mission Operations Directorate (MOD) operational functions/activities currently being developed and presents an overview of how this powerful representation can apply to robotic space missions as well.

  8. COST MODEL FOR LARGE URBAN SCHOOLS.

    ERIC Educational Resources Information Center

    O'BRIEN, RICHARD J.

    THIS DOCUMENT CONTAINS A COST SUBMODEL OF AN URBAN EDUCATIONAL SYSTEM. THIS MODEL REQUIRES THAT PUPIL POPULATION AND PROPOSED SCHOOL BUILDING ARE KNOWN. THE COST ELEMENTS ARE--(1) CONSTRUCTION COSTS OF NEW PLANTS, (2) ACQUISITION AND DEVELOPMENT COSTS OF BUILDING SITES, (3) CURRENT OPERATING EXPENSES OF THE PROPOSED SCHOOL, (4) PUPIL…

  9. COMPUTER PROGRAM FOR CALCULATING THE COST OF DRINKING WATER TREATMENT SYSTEMS

    EPA Science Inventory

    This FORTRAN computer program calculates the construction and operation/maintenance costs for 45 centralized unit treatment processes for water supply. The calculated costs are based on various design parameters and raw water quality. These cost data are applicable to small size ...

  10. Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

  11. Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stebbins, P.E.

    1993-09-01

    The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changesmore » in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.« less

  12. The space elevator: a new tool for space studies.

    PubMed

    Edwards, Bradley C

    2003-06-01

    The objective has been to develop a viable scenario for the construction, deployment and operation of a space elevator using current or near future technology. This effort has been primarily a paper study with several experimental tests of specific systems. Computer simulations, engineering designs, literature studies and inclusion of existing programs have been utilized to produce a design for the first space elevator. The results from this effort illustrate a viable design using current and near-term technology for the construction of the first space elevator. The timeline for possible construction is within the coming decades and estimated costs are less than $10 B. The initial elevator would have a 5 ton/day capacity and operating costs near $100/lb for payloads going to any Earth orbit or traveling to the Moon, Mars, Venus or the asteroids. An operational space elevator would allow for larger and much longer-term biological space studies at selectable gravity levels. The high-capacity and low operational cost of this system would also allow for inexpensive searches for life throughout our solar system and the first tests of environmental engineering. This work is supported by a grant from the NASA Institute for Advanced Concepts (NIAC).

  13. Economical and technical efficiencies evaluation of full scale piggery wastewater treatment BNR plants.

    PubMed

    Oa, S W; Choi, E; Kim, S W; Kwon, K H; Min, K S

    2009-01-01

    A method evaluating the economic efficiency of piggery waste treatment plant based on kinetics for nitrogen removal performances is executed in this study and five full scale plants were evaluated, monitored intensively during one year under steady-state conditions. The performance data from those surveyed plants were recalculated by first-order kinetic equation instead of the Monod's equation, and the nitrogen removal kinetics related with COD/TKN ratios. Two plants adapting two extreme strategies for pre treatment, 'excess phase separation', and 'minimum phase separation', were evaluated by the assessment of life cycle cost (LCC). Although the compared two plants use an opposite strategy to each other, similar evaluation results are deduced by nitrogen removal efficiencies and operational and construction costs. But the proportions of constituent elements are as different as two opposite strategies, so electrical and construction costs are inversely proportional to chemical costs and operational costs respectively.

  14. Economic Impact of Revision Surgery for Proximal Junctional Failure After Adult Spinal Deformity Surgery: A Cost Analysis of 57 Operations in a 10-year Experience at a Major Deformity Center.

    PubMed

    Theologis, Alexander A; Miller, Liane; Callahan, Matt; Lau, Darryl; Zygourakis, Corinna; Scheer, Justin K; Burch, Shane; Pekmezci, Murat; Chou, Dean; Tay, Bobby; Mummaneni, Praveen; Berven, Sigurd; Deviren, Vedat; Ames, Christopher P

    2016-08-15

    Retrospective cohort analysis. To evaluate the economic impact of revision surgery for proximal junctional failures (PJF) after thoracolumbar fusions for adult spinal deformity (ASD). PJF after fusions for ASD is a major cause of disability. Although clinical sequelae are described, PJF-revision operation costs are incompletely defined. Consecutive adults who underwent thoracolumbar fusions for ASD (August, 2003 to January, 2013) were evaluated. Inclusion criteria include construct from pelvis to L2 or above and minimum 6 months follow-up after the index ASD operation. Direct costs (surgical supplies/implants, room/care, pharmacy, services) were identified from medical billing data and calculated for index ASD operations and subsequent surgeries for PJF. Not included in direct cost data were indirect costs, charges, surgeon fees, or revision operations for indications other than PJF (i.e., pseudarthrosis). Patients were compared based on the construct's upper-instrumented vertebra: upper thoracic (UT: T1-6) versus thoracolumbar junction (TLjxn: T9-L2). Of 501 patients, 382 met inclusion criteria. Fifty-one patients [UT:14; TLjxn: 40 at index; average follow-up 32.6 months (6-92 months)] had revisions for PJF, which summed to $3.2 million total direct cost. Average direct cost of index operations for the cohort ($68,294) was significantly greater than PJF-revisions ($55,547). Compared with TLjxn, UT had a significantly higher average cost for index operations ($79,860 vs. $65,868). However, PJF-revision cases were similar in average cost (UT:$60,103; TLjxn:$53,920; P = 0.09). Costs of PJF amounted to an additional 12.1% of the total index surgical cost in 382 patients. Revision operations for PJF after long thoracolumbar fusions for ASD are associated with an average direct cost of $55,547 per case. Revision costs for PJF are similar based on the index procedure's upper-instrumented vertebra level. At a major tertiary center over a 10-year period, PJF came at a very significant economic expense amounting to $3.2 million for 57 cases. 3.

  15. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  16. Rail Transit System Cost Study

    DOT National Transportation Integrated Search

    1977-01-01

    The Transportation Systems Center serves as Systems Manager for the Rail Supporting Technology Program of the Urban Mass Transportation Administration. One task under this program has been to assess the cost of constructing, operating and maintaining...

  17. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  18. Development of three-dimensional patient face model that enables real-time collision detection and cutting operation for a dental simulator.

    PubMed

    Yamaguchi, Satoshi; Yamada, Yuya; Yoshida, Yoshinori; Noborio, Hiroshi; Imazato, Satoshi

    2012-01-01

    The virtual reality (VR) simulator is a useful tool to develop dental hand skill. However, VR simulations with reactions of patients have limited computational time to reproduce a face model. Our aim was to develop a patient face model that enables real-time collision detection and cutting operation by using stereolithography (STL) and deterministic finite automaton (DFA) data files. We evaluated dependence of computational cost and constructed the patient face model using the optimum condition for combining STL and DFA data files, and assessed the computational costs for operation in do-nothing, collision, cutting, and combination of collision and cutting. The face model was successfully constructed with low computational costs of 11.3, 18.3, 30.3, and 33.5 ms for do-nothing, collision, cutting, and collision and cutting, respectively. The patient face model could be useful for developing dental hand skill with VR.

  19. The Characterization of an Easy-to-Operate Inexpensive Student-Built Fluorimeter

    ERIC Educational Resources Information Center

    Wigton, Benjamin T.; Chohan, Balwant S.; Kreuter, Rod; Sykes, Dan

    2011-01-01

    A compact, rugged, and portable fluorimeter was designed and constructed using a 460 nm light-emitting diode for the excitation and a silicon photodiode for detection. The total cost of such an instrument is less than $110, thus allowing for deployment of multiple instruments at low cost. The fluorimeter is easy to operate and has been…

  20. Cost Accounting: Problems and Research Related to Cost Definitions and Collection of Data

    ERIC Educational Resources Information Center

    Lyons, John M.

    1978-01-01

    Recent evidence suggests that traditional cost analysis may not be the most appropriate way to justify educational budgets. This article suggests that using constructed cost models to develop operating budget requests can help ensure that the distinction between legitimate information needs and managerial autonomy is maintained. (LBH)

  1. The small community solar thermal power experiment. Parabolic dish technology for industrial process heat application

    NASA Technical Reports Server (NTRS)

    Polzien, R. E.; Rodriguez, D.

    1981-01-01

    Aspects of incorporating a thermal energy transport system (ETS) into a field of parabolic dish collectors for industrial process heat (IPH) applications were investigated. Specific objectives are to: (1) verify the mathematical optimization of pipe diameters and insulation thicknesses calculated by a computer code; (2) verify the cost model for pipe network costs using conventional pipe network construction; (3) develop a design and the associated production costs for incorporating risers and downcomers on a low cost concentrator (LCC); (4) investigate the cost reduction of using unconventional pipe construction technology. The pipe network design and costs for a particular IPH application, specifically solar thermally enhanced oil recovery (STEOR) are analyzed. The application involves the hybrid operation of a solar powered steam generator in conjunction with a steam generator using fossil fuels to generate STEOR steam for wells. It is concluded that the STEOR application provides a baseline pipe network geometry used for optimization studies of pipe diameter and insulation thickness, and for development of comparative cost data, and operating parameters for the design of riser/downcomer modifications to the low cost concentrator.

  2. The Kra Canal: An Analysis of a Foreign Policy Alternative for the United States Navy in the Indian Ocean

    DTIC Science & Technology

    1975-03-01

    construction and operation of the canal. The minimal advantages offered by the canal over the existing passages through the Malay Peninsula-Indonesian...was analyzed with respect to the advantages and costs that would result from U.S. participa- tion in the construction and operation of the canal. The...Present Status of the Canal -------------- 28 3. Motivating Factors for the Canal ..........- 31 4. Construction ----------------------------- 34 5

  3. Public/Private Partnerships for New Construction.

    ERIC Educational Resources Information Center

    Adams, Matthew C.

    1999-01-01

    Discusses how colleges can finance new construction projects during lean financial times by employing public/private partnerships in an off-balance sheet financing format. Construction planning of a new school parking deck is used to illustrate the process. Benefits of savings in operating costs, management fees, and other line-item expenses are…

  4. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  5. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  6. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  7. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  8. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  9. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  10. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  11. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    ERIC Educational Resources Information Center

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  12. RESIDENTIAL VENTILATION STUDY

    EPA Science Inventory

    This project evaluated the effectiveness, first costs and operational costs of various types of residential ventilation systems in three different climates in the U.S. The Agency, through its Energy Star Program, recommends that builders construct homes that are energy efficient ...

  13. Heating and Cooling from the Ground Up.

    ERIC Educational Resources Information Center

    Jackson, Lisa M.

    1998-01-01

    Explains why converting to geothermal heating and cooling is a good option when constructing or retrofitting schools. Reasons discussed include competitive installation costs, lower operating and maintenance costs, greater building-design flexibility, and greater user satisfaction. (GR)

  14. Development of the Mathematics of Learning Curve Models for Evaluating Small Modular Reactor Economics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, T. J.

    2014-02-01

    The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well knownmore » based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs.« less

  15. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    PubMed

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  16. Satellite Power Systems (SPS) concept definition study. Volume 2, part 2: System engineering. [cost and programmatics

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.

  17. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less

  18. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  19. Feasibility of geothermal space/water heating for Mammoth Lakes Village, California. Final report, September 1976--September 1977

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sims, A.V.; Racine, W.C.

    1977-12-01

    Results of a study to determine the technical, economic, and environmental feasibility of geothermal district heating for Mammoth Lakes Village, California are reported. The geothermal district heating system selected is technically feasible and will use existing technology in its design and operation. District heating can provide space and water heating energy for typical customers at lower cost than alternative sources of energy. If the district heating system is investor owned, lower costs are realized after five to six years of operation, and if owned by a nonprofit organization, after zero to three years. District heating offers lower costs than alternativesmore » much sooner in time if co-generation and/or DOE participation in system construction are included in the analysis. During a preliminary environmental assessment, no potential adverse environmental impacts could be identified of sufficient consequence to preclude the construction and operation of the proposed district heating system. A follow-on program aimed at implementing district heating in Mammoth is outlined.« less

  20. Basic repository environmental assessment design basis, Lavender Canyon site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Paradox Basin in Lavender Canyon, Utah. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling andmore » packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $5.51 billion. Costs include those for the collocated WHPP, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively sound nature of the salt at this site. Construction would require an estimated 7.75 years. Engineering factors and costs are not strongly influenced by environmental considerations. 51 refs., 24 figs., 20 tabs.« less

  1. Performance comparison and economics analysis of waste stabilization ponds and horizontal subsurface flow constructed wetlands treating domestic wastewater: a case study of the Juja sewage treatment works.

    PubMed

    Mburu, Njenga; Tebitendwa, Sylvie M; van Bruggen, Johan J A; Rousseau, Diederik P L; Lens, Piet N L

    2013-10-15

    The performance, effluent quality, land area requirement, investment and operation costs of a full-scale waste stabilization pond (WSP) and a pilot scale horizontal subsurface flow constructed wetland (HSSF-CW) at Jomo Kenyatta University of Agriculture and Technology (JKUAT) were investigated between November 2010 to January 2011. Both systems gave comparable medium to high levels of organic matter and suspended solids removal. However, the WSP showed a better removal for Total Phosphorus (TP) and Ammonium (NH4(+)-N). Based on the population equivalent calculations, the land area requirement per person equivalent of the WSP system was 3 times the area that would be required for the HSSF-CW to treat the same amount of wastewater. The total annual cost estimates consisting of capital, operation and maintenance (O&M) costs were comparable for both systems. However, the evaluation of the capital cost of either system showed that it is largely influenced by the size of the population served, local cost of land and the construction materials involved. Hence, one can select either system in terms of treatment efficiency. When land is available other factor including the volume of wastewater or the investment, and O&M costs determine the technology selection. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Townsend, M.W.

    The Monsanto Chemical Company operates a plastics and resins plant located in Addyston, Ohio. The process equipment requires routine rinsing with technical grade acetone between batches. Due to the volumes of spent acetone generated and the associated RCRA hazardous waste regulations, the plant sought to recycle and reuse the acetone to reduce the purchase cost of virgin acetone and the cost of spent acetone disposal. One of the first options explored was package unit distillation units. The cost of these units was in the $20--$30,000 range in 1989 dollars. Even though the cost of a package unit was not deemedmore » unreasonable, there were additional costs and concerns that led to elimination of this option. The unit would have required additional manpower to operate and maintain, i.e., at least a fraction of an operator and mechanic. For plant safety reasons, it was desired to operate this package unit outside the production building, thus construction of an outbuilding would have added to the expense of the project. Additionally, there were concerns of package unit reliability. During this evaluation, tractor-trailer mounted distillation units were discovered. The portable units were equipped with either thin-film evaporator technology capable of processing 240 to 480 gallons per hour, or pot still (batch) distillation technology capable of rates from 120 to 240 gallons per hour. Both units were constructed of stainless steel.« less

  3. Patriot Advanced Capability-3 Missile Segment Enhancement (PAC-3 MSE)

    DTIC Science & Technology

    2015-12-01

    Threshold Demonstrated Performance Current Estimate System Training Proficiency Level Soldiers (Operators, Maintainers, and Leaders) are able to...constructive training environments by using TADSS to conduct multi- level training for both operators and maintenance personnel. With the addition...0.0 Total 6037.0 6037.0 N/A 6276.9 6722.3 6722.3 6900.3 Current APB Cost Estimate Reference Army Cost Position dated February 28, 2014 Confidence Level

  4. Maquiladora Operations for Shipbuilding

    DTIC Science & Technology

    1991-09-01

    costs through the use of a maquila - dora may provide the opportunity to bring the cost of new construction down. Global Enterprise Anticipating the...been able to retain their market share by moving operations such as engine production to maquila - doras. The Japanese have strengthened their market...the foreign markets. IIIA2-4 Opportunities for Macuiladoras For a U.S. shipbuilder to invest the time and capital to develop a maquila - dora, it will

  5. Performance and cost evaluation of constructed wetland for domestic waste water treatment.

    PubMed

    Deeptha, V T; Sudarsan, J S; Baskar, G

    2015-09-01

    Root zone treatment through constructed wetlands is an engineered method of purifying wastewater. The aim of the present research was to study the potential of wetland plants Phragmites and Typha in treatment of wastewater and to compare the cost of constructed wetlands with that of conventional treatment systems. A pilot wetland unit of size 2x1x0.9 m was constructed in the campus. 3x3 rows of plants were transplanted into the pilot unit and subjected to wastewater from the hostels and other campus buildings. The raw wastewater and treated wastewater were collected periodically and tested for Total nitrogen (TN),Total Phosphorous (TP), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD). It was observed that this pilot unit reduced the concentrations of TN, TP, BOD and COD by 76, 73, 83 and 86%, respectively, on an average. Root zone system achieved standards for tertiary treatment with low operating costs, low maintenance costs, enhance the landscape, provide a natural habitat for birds, and did not emit any odour.

  6. Empirically observed learning rates for concentrating solar power and their responses to regime change

    NASA Astrophysics Data System (ADS)

    Lilliestam, Johan; Labordena, Mercè; Patt, Anthony; Pfenninger, Stefan

    2017-07-01

    Concentrating solar power (CSP) capacity has expanded slower than other renewable technologies and its costs are still high. Until now, there have been too few CSP projects to derive robust conclusions about its cost development. Here we present an empirical study of the cost development of all operating CSP stations and those under construction, examining the roles of capacity growth, industry continuity, and policy support design. We identify distinct CSP expansion phases, each characterized by different cost pressure in the policy regime and different industry continuity. In 2008-2011, with low cost pressure and following industry discontinuity, costs increased. In the current phase, with high cost pressure and continuous industry development, costs decreased rapidly, with learning rates exceeding 20%. Data for projects under construction suggest that this trend is continuing and accelerating. If support policies and industrial structure are sustained, we see no near-term factors that would hinder further cost decreases.

  7. A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction

    PubMed Central

    Fu, Fang; Zhang, Tao

    2016-01-01

    A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939

  8. Cost Control

    ERIC Educational Resources Information Center

    Foreman, Phillip

    2009-01-01

    Education administrators involved in construction initiatives unanimously agree that when it comes to change orders, less is more. Change orders have a negative rippling effect of driving up building costs and producing expensive project delays that often interfere with school operations and schedules. Some change orders are initiated by schools…

  9. Cost-effective solutions for sewage treatment in developing countries--the case of Brazil.

    PubMed

    Jordão, E P; Volschan, I

    2004-01-01

    Cost-effective solutions are a must in developing countries, not only regarding investment costs, but also in respect to technology and operating practices. With these two goals in mind, in Brazil a particular effort has been directed for the development and application of the Chemical Enhanced Primary Treatment (CEPT) process and of the Upflow Anaerobic Sludge Blanket (UASB) process, both followed by complementary secondary treatment. Both technologies are under current expansion in Brazil. Large CEPT plants have been designed and built, up to 3.7 m3/s average design flow, as well as large UASB reactors, up to 3.0 m3/s average design flow. The applied technologies are cost-effective: they present low investment and efficiencies of BOD removal of up to 50% to 70%. They allow the plant construction in steps, an initial phase with efficiency over the usual primary treatment, and in order to achieve best effluent quality and meet legal water quality standards, a logic upgrade post-treatment can later on be implemented. The higher initial reduction of BOD and TSS also permits savings in construction and operational costs of secondary treatment, due to lower organic load and lower energy consumption. Sludge represents a particular point of attention: in the cases when the CEPT was used, Chemical Stabilisation of the Sludge (CSS) has also been practiced, eliminating the high construction costs of the digesters, all the plant staying chemically operated. In the cases when the UASB is used preceding secondary treatment, sludge can easily return to the anaerobic vessel, the costly sludge digestion unit being avoided. UASB reactors have practically no equipment in the anaerobic vessel, no energy consumption, low sludge production, and when applied in hot climates as in Brazil, heating devices are not required. The Brazilian experience, some particular cases, special comments on design and different secondary treatment processes are presented in this paper, as a contribution to the discussion of cost and benefits, a prime point to be considered.

  10. Statistical methods of estimating mining costs

    USGS Publications Warehouse

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  11. 26 CFR 1.861-10T - Special allocations of interest expense (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... certain assets that are acquired in integrated financial transaction. Paragraph (d) of this section... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...

  12. 26 CFR 1.861-10T - Special allocations of interest expense (temporary).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...

  13. 26 CFR 1.861-10T - Special allocations of interest expense (temporary).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...

  14. 26 CFR 1.861-10T - Special allocations of interest expense (temporary).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...

  15. 26 CFR 1.861-10T - Special allocations of interest expense (temporary).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... generated by certain assets that are acquired in integrated financial transaction. Paragraph (d) of this... flow from the property. (ii) Self-constructed assets. The activities associated with self-construction... subtracting cash disbursements excluding debt service from cash receipts. (iv) Analysis of operating costs...

  16. 43 CFR 3809.552 - What must my individual financial guarantee cover?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS... construction and maintenance costs for any treatment facilities necessary to meet Federal and State... requirements. The funding must be adequate to provide for construction, long-term operation, maintenance, or...

  17. 43 CFR 3809.552 - What must my individual financial guarantee cover?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS... construction and maintenance costs for any treatment facilities necessary to meet Federal and State... requirements. The funding must be adequate to provide for construction, long-term operation, maintenance, or...

  18. 43 CFR 3809.552 - What must my individual financial guarantee cover?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS... construction and maintenance costs for any treatment facilities necessary to meet Federal and State... requirements. The funding must be adequate to provide for construction, long-term operation, maintenance, or...

  19. Capital update factor: a new era approaches.

    PubMed

    Grimaldi, P L

    1993-02-01

    The Health Care Financing Administration (HCFA) has constructed a preliminary model of a new capital update method which is consistent with the framework being developed to refine the update method for PPS operating costs. HCFA's eventual goal is to develop a single update framework for operating and capital costs. Initial results suggest that adopting the new capital update method would reduce capital payments substantially, which might intensify creditor's concerns about extending loans to hospitals.

  20. Alternative Models of Service, Centralized Machine Operations. Phase II Report. Volume II.

    ERIC Educational Resources Information Center

    Technology Management Corp., Alexandria, VA.

    A study was conducted to determine if the centralization of playback machine operations for the national free library program would be feasible, economical, and desirable. An alternative model of playback machine services was constructed and compared with existing network operations considering both cost and service. The alternative model was…

  1. Technical data for concentrated solar power plants in operation, under construction and in project.

    PubMed

    Pelay, Ugo; Luo, Lingai; Fan, Yilin; Stitou, Driss; Rood, Mark

    2017-08-01

    This article presents technical data for concentrated solar power (CSP) plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant) and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.). Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017) [1].

  2. Long-lived space observatories for astronomy and astrophysics

    NASA Technical Reports Server (NTRS)

    Savage, Blair D.; Becklin, Eric E.; Beckwith, Steven V. W.; Cowie, Lennox L.; Dupree, Andrea K.; Elliot, James L.; Gallagher, John S.; Helfand, David J.; Jenkins, Edward F.; Johnston, Kenneth J.

    1987-01-01

    NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

  3. Satellite Power System (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Haley, G. M.

    1979-01-01

    The major outputs of the study are the constructability studies which resulted in the definition of the concepts for satellite, rectenna, and satellite construction base construction. Transportation analyses resulted in definition of heavy-lift launch vehicle, electric orbit transfer vehicle, personnel orbit transfer vehicle, and intra-orbit transfer vehicle as well as overall operations related to transportation systems. The experiment/verification program definition resulted in the definition of elements for the Ground-Based Experimental Research and Key Technology plans. These studies also resulted in conceptual approaches for early space technology verification. The cost analysis defined the overall program and cost data for all program elements and phases.

  4. DEVELOPING ALTERNATIVE POWER TO DRIVE A PARTITIONED AQUACULTURE SYSTEM FOR INTENSIVE FOOD FISH PRODUCTION

    EPA Science Inventory

    Data collected, such as fish production rates and construction/operating costs, will allow us to evaluate the predictions generated by our modeling activities as well as provide real estimates of cost/benefit for the application of alternative PAS technology in temperate water...

  5. 30 CFR 1206.354 - How do I determine generating deductions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... electricity from the plant tailgate value of the electricity (usually the transmission-reduced value of the...'s-length power plant contract. (b)(1) You must base your generating costs deduction on your actual annual costs associated with the construction and operation of a geothermal power plant. (i) You must...

  6. 25 CFR 137.4 - Future charges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.4 Future charges. The payment of said construction cost and costs of future operation and maintenance of said project as provided for in said section 3 of the... contract by and between the San Carlos irrigation and drainage district and the Secretary of the Interior...

  7. 25 CFR 137.4 - Future charges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.4 Future charges. The payment of said construction cost and costs of future operation and maintenance of said project as provided for in said section 3 of the... contract by and between the San Carlos irrigation and drainage district and the Secretary of the Interior...

  8. 25 CFR 137.4 - Future charges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.4 Future charges. The payment of said construction cost and costs of future operation and maintenance of said project as provided for in said section 3 of the... contract by and between the San Carlos irrigation and drainage district and the Secretary of the Interior...

  9. 25 CFR 137.4 - Future charges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.4 Future charges. The payment of said construction cost and costs of future operation and maintenance of said project as provided for in said section 3 of the... contract by and between the San Carlos irrigation and drainage district and the Secretary of the Interior...

  10. 25 CFR 137.4 - Future charges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.4 Future charges. The payment of said construction cost and costs of future operation and maintenance of said project as provided for in said section 3 of the... contract by and between the San Carlos irrigation and drainage district and the Secretary of the Interior...

  11. Operation and Maintenance Support Information (OMSI) Creation, Management, and Repurposing With XML

    DTIC Science & Technology

    2004-09-01

    engines that cost tens of thousands of dollars. There are many middleware applications on the commercial and open-source market . The “Big Four......planners can begin an incremental planning effort early in the facility construction phase. This thesis provides a non-proprietary, no- cost solution to

  12. Life Cycle Cost Analysis Handbook. First Edition.

    ERIC Educational Resources Information Center

    Alaska State Dept. of Education and Early Development, Juneau.

    This handbook presents guidelines on the Life Cycle Cost Analysis (LCCA) of building operations over the life of a building to assist school districts and consultants with evaluating proposed educational facility construction projects. It defines the terminology found in an LCCA, such as initial and future expenses, residual value, real discount…

  13. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less

  14. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  15. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  16. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  17. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    PubMed

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  18. An inventory of aeronautical ground research facilities. Volume 1: Wind tunnels

    NASA Technical Reports Server (NTRS)

    Pirrello, C. J.; Hardin, R. D.; Heckart, M. V.; Brown, K. R.

    1971-01-01

    A survey of wind tunnel research facilities in the United States is presented. The inventory includes all subsonic, transonic, and hypersonic wind tunnels operated by governmental and private organizations. Each wind tunnel is described with respect to size, mechanical operation, construction, testing capabilities, and operating costs. Facility performance data are presented in charts and tables.

  19. Save Energy $.

    ERIC Educational Resources Information Center

    Hirsch, Thomas E., III; Shapiro, Robert F.

    1986-01-01

    Large institutional energy users can reduce energy costs by constructing and operating steam and electricity cogeneration facilities and purchasing their own gas at lower prices rather than relying on local distributors. (MSE)

  20. Comparison of alternative relative weights for diagnosis-related groups

    PubMed Central

    Cotterill, Philip; Bobula, Joel; Connerton, Rose

    1986-01-01

    During this study, we investigated the extent to which diagnosis-related group (DRG) relative weights based exclusively on charge data differ from DRG weights constructed according to the methodology used in deriving the original relative weights for the Medicare prospective payment system (PPS). The PPS operating cost weights were based on a combination of cost and adjusted charge information (Pettengill and Vertrees, 1982). The results of this study reveal only minor differences between the two sets of weights. Interhospital differences in cost-to-charge ratios do not produce large, arbitrary differences between charge-based and operating cost weights. Whether the data are standardized for differences in capital and medical education costs also appears to make little difference. PMID:10311495

  1. 38 CFR 39.15 - Amount of grant.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATES FOR ESTABLISHMENT, EXPANSION, AND IMPROVEMENT OF VETERANS' CEMETERIES (Eff. until 7-16-10) Award... grant, the cost of equipment necessary for the operation of the State cemetery. This may include the... operation of the State cemetery, but only if: (i) Included in the construction contract; (ii) Installed...

  2. 18 CFR 367.4120 - Account 412, Cost and expenses of construction or other services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... undertakes projects to construct physical property for associate or non-associate companies (see General... HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR..., FEDERAL POWER ACT AND NATURAL GAS ACT Income Statement Chart of Accounts Service Company Operating Income...

  3. Community Commitment: How Education Institutions Can Best Use Green Strategies in their Construction Projects

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2008-01-01

    Education institutions that embrace green concepts in their construction projects are able to provide safe and healthful learning environments that are responsive to the community. Carrying out these strategies can enhance student learning, reduce health and operations costs, and enhance the quality of a school. Moreover, these high-performing…

  4. Note: An inexpensive square waveform ion funnel driver

    NASA Astrophysics Data System (ADS)

    Hoffman, Nathan M.; Opačić, Bojana; Reilly, Peter T. A.

    2017-01-01

    An inexpensive frequency variable square waveform generator (WFG) was developed to use with existing sinusoidal waveform driven ion funnels. The developed WFG was constructed using readily available low voltage DC power supplies and discrete components placed in printed circuit boards. As applied to ion funnels, this WFG represents considerable cost savings over commercially available products without sacrificing performance. Operation of the constructed pulse generator has been demonstrated for a 1 nF ion funnel at an operating frequency of 1 MHz while switching 48 Vp-p.

  5. Note: An inexpensive square waveform ion funnel driver.

    PubMed

    Hoffman, Nathan M; Opačić, Bojana; Reilly, Peter T A

    2017-01-01

    An inexpensive frequency variable square waveform generator (WFG) was developed to use with existing sinusoidal waveform driven ion funnels. The developed WFG was constructed using readily available low voltage DC power supplies and discrete components placed in printed circuit boards. As applied to ion funnels, this WFG represents considerable cost savings over commercially available products without sacrificing performance. Operation of the constructed pulse generator has been demonstrated for a 1 nF ion funnel at an operating frequency of 1 MHz while switching 48 V p-p .

  6. 24 CFR 585.401 - Recordkeeping by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... information as age, high school drop out status, income level, gender, employment status, and racial and..., architectural and engineering fees, construction, rehabilitation, operating costs or replacement reserves for...

  7. 16. VIEW LOOKING NORTHEAST AT BUILDING 11 (111) IN 1952. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. VIEW LOOKING NORTHEAST AT BUILDING 11 (111) IN 1952. IN 1952, BUILDINGS 11 (111), 12 (121), 21 (221), 22 (122), 23 (123), AND 42 (442) WERE OCCUPIED. BUILDINGS 91 (991) AND 81 (881) WERE OPERATIONAL. BUILDINGS 44 (444) AND 71 (771) WERE UNDER CONSTRUCTION. THE TOTAL COST FOR CONSTRUCTION BY 1952 WAS $2.5 MILLION. BY SEPTEMBER OF 1953, AUSTIN COMPANY HAD COMPLETED 21 BUILDINGS FOR AN APPROXIMATE COST OF $43.3 MILLION (1952). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  8. U.S. Nuclear Power Plants: Continued Life or Replacement After 60? (released in AEO2010)

    EIA Publications

    2010-01-01

    Nuclear power plants generate approximately 20% of U.S. electricity, and the plants in operation today are often seen as attractive assets in the current environment of uncertainty about future fossil fuel prices, high construction costs for new power plants (particularly nuclear plants), and the potential enactment of greenhouse gas regulations. Existing nuclear power plants have low fuel costs and relatively high power output. However, there is uncertainty about how long they will be allowed to continue operating.

  9. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  10. 7 CFR 1951.853 - Loan purposes for undisbursed RDLF loan funds from HHS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... but not be limited to: (i) Business acquisitions, construction, conversion, enlargement, repair... supplies. (iv) Pollution control and abatement. (v) Transportation services. (vi) Startup operating costs...

  11. 23 CFR 630.709 - Conversion to a regular Federal-aid project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Advance Construction of Federal-Aid Projects § 630.709... State Department of Transportation may claim reimbursement for the Federal share of project costs...

  12. 23 CFR 630.709 - Conversion to a regular Federal-aid project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Advance Construction of Federal-Aid Projects § 630.709... State Department of Transportation may claim reimbursement for the Federal share of project costs...

  13. 23 CFR 630.709 - Conversion to a regular Federal-aid project.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Advance Construction of Federal-Aid Projects § 630.709... State Department of Transportation may claim reimbursement for the Federal share of project costs...

  14. 23 CFR 630.709 - Conversion to a regular Federal-aid project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Advance Construction of Federal-Aid Projects § 630.709... State Department of Transportation may claim reimbursement for the Federal share of project costs...

  15. 23 CFR 630.709 - Conversion to a regular Federal-aid project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Advance Construction of Federal-Aid Projects § 630.709... State Department of Transportation may claim reimbursement for the Federal share of project costs...

  16. Design and experimental characterization of flexure activated by SMA wires for microassembly operations

    NASA Astrophysics Data System (ADS)

    Flores, Abiud; Ahuett, Horacio; Song, Gangbing

    2006-03-01

    Compliant mechanisms have a wide range of application in microassembly, micromanipulation and microsurgery. This article presents a low cost Flexure-Stage actuated by two SMA-wires that produces displacement in one direction in a range from 0 to 10 μm. The Flexure-Stage acts as a mechanical transform by reducing and changing the direction of the SMA actuator output displacement. The Flexure-Stage system has its application in microassembly operation and was built at cost of US$ 35 cost. The design methodology of a flexure-stage from concept design through FEA modeling and finally to construction and characterization is presented in this paper.

  17. Investigation of advanced navigation and guidance system concepts for all-weather rotorcraft operations

    NASA Technical Reports Server (NTRS)

    Upton, H. W.; Boen, G. E.; Moore, J.

    1982-01-01

    Results are presented of a survey conducted of active helicopter operators to determine the extent to which they wish to operate in IMC conditions, the visibility limits under which they would operate, the revenue benefits to be gained, and the percent of aircraft cost they would pay for such increased capability. Candidate systems were examined for capability to meet the requirements of a mission model constructed to represent the modes of flight normally encountered in low visibility conditions. Recommendations are made for development of high resolution radar, simulation of the control display system for steep approaches, and for development of an obstacle sensing system for detecting wires. A cost feasibility analysis is included.

  18. Economic Conditions and Factors Affecting New Nuclear Power Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.

    2014-10-01

    This report documents work performed in support of the US Department of Energy Office of Nuclear Energy’s Advanced Small Modular Reactor (AdvSMR) program. The report presents information and results from economic analyses to describe current electricity market conditions and those key factors that may impact the deployment of AdvSMRs or any other new nuclear power plants. Thus, this report serves as a reference document for DOE as it moves forward with its plans to develop advanced reactors, including AdvSMRs. For the purpose of this analysis, information on electricity markets and nuclear power plant operating costs will be combined to examinemore » the current state of the nuclear industry and the process required to successfully move forward with new nuclear power in general and AdvSMRs in particular. The current electricity market is generally unfavorable to new nuclear construction, especially in deregulated markets with heavy competition from natural gas and subsidized renewables. The successful and profitable operation of a nuclear power plant (or any power plant) requires the rate at which the electricity is sold to be sufficiently greater than the cost to operate. The wholesale rates in most US markets have settled into values that provide profits for most operating nuclear power plants but are too low to support the added cost of capital recovery for new nuclear construction. There is a strong geographic dependence on the wholesale rate, with some markets currently able to support new nuclear construction. However, there is also a strong geographic dependence on pronuclear public opinion; the areas where power prices are high tend to have unfavorable views on the construction of new nuclear power plants. The use of government-backed incentives, such as subsidies, can help provide a margin to help justify construction projects that otherwise may not seem viable. Similarly, low interest rates for the project will also add a positive margin to the economic analysis. In both cases, the profitable price point is decreased, making more markets open to profitable entry. Overall, the economic attractiveness of a nuclear power construction project is not only a function of its own costs, but a function of the market into which it is deployed. Many of the market characteristics are out of the control of the potential nuclear power plant operators. The decision-making process for the power industry in general is complicated by the short-term market volatility in both the wholesale electricity market and the commodity (natural gas) market. Decisions based on market conditions today may be rendered null and void in six months. With a multiple-year lead time, nuclear power plants are acutely vulnerable to market corrections.« less

  19. Solar power satellite system definition study, phase 2. Volume 2: Reference system description

    NASA Technical Reports Server (NTRS)

    1979-01-01

    System descriptions and cost estimates for the reference system of the solar power satellite program are presented. The reference system is divided into five principal elements: the solar power satellites; space construction and support; space and ground transportation; ground receiving stations; and operations control. The program scenario and non-recurring costs are briefly described.

  20. Integrated waste management system costs in a MPC system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Supko, E.M.

    1995-12-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility.

  1. 32 CFR 231.5 - Procedures-domestic banks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... grass cutting and snow removal) at rates set forth in the lease, operating agreement or other written..., and other furnished services. (7) Banks shall pay all construction costs. (h) Bank liaison officer...

  2. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  3. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  4. Economic and environmental costs of regulatory uncertainty for coal-fired power plants.

    PubMed

    Patiño-Echeverri, Dalia; Fischbeck, Paul; Kriegler, Elmar

    2009-02-01

    Uncertainty about the extent and timing of CO2 emissions regulations for the electricity-generating sector exacerbates the difficulty of selecting investment strategies for retrofitting or alternatively replacing existent coal-fired power plants. This may result in inefficient investments imposing economic and environmental costs to society. In this paper, we construct a multiperiod decision model with an embedded multistage stochastic dynamic program minimizing the expected total costs of plant operation, installations, and pollution allowances. We use the model to forecast optimal sequential investment decisions of a power plant operator with and without uncertainty about future CO2 allowance prices. The comparison of the two cases demonstrates that uncertainty on future CO2 emissions regulations might cause significant economic costs and higher air emissions.

  5. Geostationary platform systems concepts definition study. Volume 2: Technical, book 1

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The initial selection and definition of operational geostationary platform concepts is discussed. Candidate geostationary platform missions and payloads were identified from COMSAT, Aerospace, and NASA studies. These missions and payloads were cataloged; classified with to communications, military, or scientific uses; screened for application and compatibility with geostationary platforms; and analyzed to identify platform requirements. Two platform locations were then selected (Western Hemisphere - 110 deg W, and Atlantic - 15 deg W), and payloads allocated based on nominal and high traffic models. Trade studies were performed leading to recommendation of selected concepts. Of 30 Orbit Transfer Vehicle (0TV) configuration and operating mode options identified, 18 viable candidates compatible with the operational geostationary platform missions were selected for analysis. Each was considered using four platform operational modes - 8 or 16 year life, and serviced or nonserviced, providing a total of 72 OTV/platform-mode options. For final trade study concept selection, a cost program was developed considering payload and platform costs and weight; transportation unit and total costs for the shuttle and OTV; and operational costs such as assembly or construction time, mating time, and loiter time. Servicing costs were added for final analysis and recommended selection.

  6. 24 CFR 585.310 - Project-related restrictions applicable to Youthbuild transitional housing for the homeless.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation grant includes the eligible activities of acquisition, architectural and engineering fees, construction, rehabilitation, operating costs or replacement reserves of transitional housing units, and where...

  7. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mehra, S.; Bryce, T.

    Sedco Forex has recently completed a new land drilling rig, currently deployed in Gabon, that integrates well construction activities with multiskilling to create cost savings across the board in drilling operations. Historically, operators have produced a comprehensive tender package specifying strictly the type and size of individual rig components and the number of personnel required to drill. In this case, the drilling contractor provides a fit-for-purpose rig, consistent with field location, well profile, operator`s priorities, and local constraints.

  9. Equipment for testing automotive lead/acid batteries under SAE J240a conditions

    NASA Astrophysics Data System (ADS)

    Hamilton, J. A.; Rand, D. A. J.

    Battery cycling equipment has been designed and constructed to test lead/acid batteries according to the American Society of Automotive Engineers' (SAE) J240a Standard. This life test simulates automotive service where the battery operates in a voltage-regulated charging system. The CSIRO design uses a master/slave concept to reduce both construction time and cost.

  10. Magnetic fields of green.

    PubMed

    Branton, Scott; Lile, Lawrence

    2011-01-01

    By incorporating even the basic elements of a more environmentally friendly, "green"construction and design in an MRI setting can create a safer, more pleasant space for the patients and staff, better images, and operational cost savings. Using building systems that have reduced amounts of steel can decrease construction time, increase thermal insulation, and reduce the weight of the structure meaning less energy required to transport and install. HVAC systems and lighting design can also play a major role in creating a "green"MRI suite. LEED certification places a focus on quality of the built environment, life cycle cost, and a productive indoor environment, as well as impact on the exterior environment. An LEED certified building considers costs and benefits for the lifetime of the building.

  11. Evaluation of Passive Vents in New Construction Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maxwell, Sean; Berger, David; Zuluaga, Marc

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high-performance new construction multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards. CARB's 2014 'Evaluation of Ventilation Strategies in New Construction Multifamily Buildings' consistently demonstrated that commonly used outdoor air strategies are not performing as expected. Of the four strategies evaluated in 2014, the exhaust ventilation system that relied on outdoor air from a pressurized corridor was ruled out as amore » potential best practice due to its conflict with meeting requirements within most fire codes. Outdoor air that is ducted directly to the apartments was a strategy determined to have the highest likelihood of success, but with higher first costs and operating costs. Outdoor air through space conditioning systems was also determined to have good performance potential, with proper design and execution. The fourth strategy, passive systems, was identified as the least expensive option for providing outdoor air directly to apartments, with respect to both first costs and operating costs. However, little is known about how they actually perform in real-world conditions or how to implement them effectively. Based on the lack of data available on the performance of these low-cost systems and their frequent use in the high-performance building programs that require a provision for outdoor air, this research project sought to further evaluate the performance of passive vents.« less

  12. Building America Case Study: Evaluation of Passive Vents in New-Construction Multifamily Buildings, New York, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high-performance new construction multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards. CARB's 2014 'Evaluation of Ventilation Strategies in New Construction Multifamily Buildings' consistently demonstrated that commonly used outdoor air strategies are not performing as expected. Of the four strategies evaluated in 2014, the exhaust ventilation system that relied on outdoor air from a pressurized corridor was ruled out as amore » potential best practice due to its conflict with meeting requirements within most fire codes. Outdoor air that is ducted directly to the apartments was a strategy determined to have the highest likelihood of success, but with higher first costs and operating costs. Outdoor air through space conditioning systems was also determined to have good performance potential, with proper design and execution. The fourth strategy, passive systems, was identified as the least expensive option for providing outdoor air directly to apartments, with respect to both first costs and operating costs. However, little is known about how they actually perform in real-world conditions or how to implement them effectively. Based on the lack of data available on the performance of these low-cost systems and their frequent use in the high-performance building programs that require a provision for outdoor air, this research project sought to further evaluate the performance of passive vents.« less

  13. An analytic-numerical method for the construction of the reference law of operation for a class of mechanical controlled systems

    NASA Astrophysics Data System (ADS)

    Mizhidon, A. D.; Mizhidon, K. A.

    2017-04-01

    An analytic-numerical method for the construction of a reference law of operation for a class of dynamic systems describing vibrations in controlled mechanical systems is proposed. By the reference law of operation of a system, we mean a law of the system motion that satisfies all the requirements for the quality and design features of the system under permanent external disturbances. As disturbances, we consider polyharmonic functions with known amplitudes and frequencies of the harmonics but unknown initial phases. For constructing the reference law of motion, an auxiliary optimal control problem is solved in which the cost function depends on a weighting coefficient. The choice of the weighting coefficient ensures the design of the reference law. Theoretical foundations of the proposed method are given.

  14. A Portable, Low-Cost, LED Fluorimeter for Middle School, High School, and Undergraduate Chemistry Labs

    ERIC Educational Resources Information Center

    Wigton, Benjamin T.; Chohan, Balwant S.; McDonald, Cole; Johnson, Matt; Schunk, Doug; Kreuter, Rod; Sykes, Dan

    2011-01-01

    A low-cost portable fluorimeter was constructed using a 360 nm LED for excitation and a silicon photodiode for detection. The instrument is simple to operate and has been used to investigate fluorescent whitening agents extracted from various brands of paper, to determine the linear range and limit of detection of quinine in various commercial…

  15. Maglev System Concept Definition (SCD) System Safety Review

    DOT National Transportation Integrated Search

    1993-01-07

    As part of the National Maglev Initiative (NMI), the Federal Railroad : Administration (FRA) solicited proposals to conceptually define the technical feasibility, : performance and costs of constructing and operating Maglev systems in the United : St...

  16. Construction Costs and Operating Characteristics of Vintage Trolleys

    DOT National Transportation Integrated Search

    1992-03-01

    Today, the United States is witnessing a growing renaissance of vintage trolley systems. Vintage trolleys have been successfully integrated into the public transportation systems in several cities. Businessmen in many areas have pursued vintage troll...

  17. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    USGS Publications Warehouse

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative to transportation network and population distribution data. The models can be used on a regional scale to quickly map the relative site suitability for a RAP or RPCC aggregate recycling operation in a particular area based on transportation network and population parameters. The results can be used to identify general areas to be further evaluated on a site-specific basis using more detailed marketplace information. As transportation or population features change due to planning or actual development, the models can be easily revised to reflect these changes. ?? 2004 Elsevier B.V. All rights reserved.

  18. Traffic airships with special reference to economy

    NASA Technical Reports Server (NTRS)

    Leyensetter, Walther

    1921-01-01

    The first part of this report details the efficiency and economy of airship travel, while the second part presents methods of economic efficiency with regards to construction, cost of upkeep and operation, and the establishment of airship lines.

  19. The impact of climate change on transportation in the gulf coast

    USGS Publications Warehouse

    Savonis, M.J.; Burkett, V.R.; Potter, J.R.; Kafalenos, R.; Hyman, R.; Leonard, K.

    2009-01-01

    Climate affects the design, construction, safety, operations, and maintenance of transportation infrastructure and systems. The prospect of a changing climate raises critical questions regarding how alterations in temperature, precipitation, storm events, and other aspects of the climate could affect the nation's transportation system. This regional assessment of climate change and its potential impacts on transportation systems addresses these questions for the central Gulf Coast between Houston and Mobile. Warming temperatures are likely to increase the costs of transportation construction, maintenance, and operations. More frequent extreme precipitation events will likely disrupt transportation networks with flooding and visibility problems. Relative sea level rise will make much of the existing infrastructure more prone to frequent or permanent inundation. Increased storm intensity may lead to increased service disruption and damage. Consideration of these factors in today's transportation decisions should lead to a more robust, resilient, and cost-effective transportation network in the coming decades. ?? 2009 ASCE.

  20. ROBucket: A low cost operant chamber based on the Arduino microcontroller.

    PubMed

    Devarakonda, Kavya; Nguyen, Katrina P; Kravitz, Alexxai V

    2016-06-01

    The operant conditioning chamber is a cornerstone of animal behavioral research. Operant boxes are used to assess learning and motivational behavior in animals, particularly for food and drug reinforcers. However, commercial operant chambers cost several thousands of dollars. We have constructed the Rodent Operant Bucket (ROBucket), an inexpensive and easily assembled open-source operant chamber based on the Arduino microcontroller platform, which can be used to train mice to respond for sucrose solution or other liquid reinforcers. The apparatus contains two nose pokes, a drinking well, and a solenoid-controlled liquid delivery system. ROBucket can run fixed ratio and progressive ratio training schedules, and can be programmed to run more complicated behavioral paradigms. Additional features such as motion sensing and video tracking can be added to the operant chamber through the array of widely available Arduino-compatible sensors. The design files and programming code are open source and available online for others to use.

  1. Electrically actuatable temporal tristimulus-color device

    DOEpatents

    Koehler, Dale R.

    1992-01-01

    The electrically actuated light filter operates in a cyclical temporal mode to effect a tristimulus-color light analyzer. Construction is based on a Fabry-Perot interferometer comprised of a high-speed movable mirror pair and cyclically powered electrical actuators. When combined with a single vidicon tube or a monochrome solid state image sensor, a temporally operated tristimulus-color video camera is effected. A color-generated is accomplished when constructed with a companion light source and is a flicker-free colored-light source for transmission type display systems. Advantages of low cost and small physical size result from photolithographic batch-processing manufacturability.

  2. Space Operations Center - A concept analysis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.

  3. Liquid Thermal Diffusion during the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Cameron Reed, B.

    2011-06-01

    On the basis of Manhattan Engineer District documents, a little known Naval Research Laboratory report of 1946, and other sources, I construct a more complete history of the liquid-thermal-diffusion method of uranium enrichment during World War II than is presented in official histories of the Manhattan Project. This method was developed by Philip Abelson (1913-2004) and put into operation at the rapidly-constructed S-50 plant at Oak Ridge, Tennessee, which was responsible for the first stage of uranium enrichment, from 0.72% to 0.85% U-235, producing nearly 45,000 pounds of enriched U-235 by July 1945 at a cost of just under 20 million. I review the history, design, politics, construction, and operation of the S-50 liquid-thermal-diffusion plant.

  4. Booster Applications Facility report, phase 2

    NASA Astrophysics Data System (ADS)

    Thieberger, P.

    1991-06-01

    This report summarizes studies and planning performed by Brookhaven National Laboratory (BNL) personnel at the request of NASA for the design, construction and operation of experimental areas and facilities for utilization of ion beams from the BNL Booster synchrotron particle accelerator. These facilities would be primarily utilized to simulate space radiation for radiobiological research, shielding studies and detector calibrations. The feasibility of such a project has been established, preliminary designs and cost estimates have been developed and a formal proposal can be submitted pending DOE concurrence. The main body of this report consists of the material presented by BNL during the meeting with a NASA appointed Panel on December 10 and 11, 1990. The individual speakers have provided brief summaries of their talks and explanations of their figures. In addition there are two appendices. One, contains detailed discussion of the shared mode of operation and the corresponding beam compatibility tables. The second appendix contains cost estimate details. An executive summary on budgets and schedules has been added, containing possible phased construction and outfitting scenarios and the corresponding expense and commitment profiles as well as new operational cost estimates. Material contained in the executive summary reflects the correction of some errors and new studies performed in response to the NASA Panel suggestions.

  5. Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lnu, Indumathi

    University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than themore » other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.« less

  6. Assembling of Steel Angle Headframe of Multifunctional Purpose

    NASA Astrophysics Data System (ADS)

    Kassikhina, E. G.; Pershin, V. V.; Volkov, V. M.

    2017-10-01

    The article reviews new technical solution on equipment provision of vertical shaft utilizing steel headframe of multifunctional purpose. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The proposed headframe combines the functions of sinking and operation that eliminates costs for assembling/dissembling of temporary headgear. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.

  7. Ahuachapan geothermal project: a technical and economic assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloomster, C.H.; DiPippo; Kuwada, J.T.

    Theeconomic and technical factors involved in using geothermal energy at Ahuachapan are examined. The experience at Ahuachapan is evaluated in relation to conditions prevailing in El Salvador and to conditions in the U.S. technical characteristics considered are: geological characteristics, well programs and gathering system, well productivity and geofluid characteristics, and energy conversion systems. Economic factors considered for El Salvador are: construction costs; environmental control costs; operating experience and costs; financing; taxes, subsidies, or incentives; marketing; and electrical system characteristics. (MHR)

  8. Improved, low cost inorganic-organic separators for rechargeable silver-zinc batteries

    NASA Technical Reports Server (NTRS)

    Sheibley, D. W.

    1979-01-01

    Several flexible, low-cost inorganic-organic separators with performance characteristics and cycle life equal to, or better than, the Lewis Research Center Astropower separator were developed. These new separators can be made on continuous-production equipment at about one-fourth the cost of the Astropower separator produced the same way. In test cells, these new separators demonstrate cycle life improvement, acceptable operating characteristics, and uniform current density. The various separator formulas, test cell construction, and data analysis are described.

  9. Scale Matters: A Cost-Outcome Analysis of an m-Health Intervention in Malawi.

    PubMed

    Larsen-Cooper, Erin; Bancroft, Emily; Rajagopal, Sharanya; O'Toole, Maggie; Levin, Ann

    2016-04-01

    The primary objectives of this study are to determine cost per user and cost per contact with users of a mobile health (m-health) intervention. The secondary objectives are to map costs to changes in maternal, newborn, and child health (MNCH) and to estimate costs of alternate implementation and usage scenarios. A base cost model, constructed from recurrent costs and selected capital costs, was used to estimate average cost per user and per contact of an m-health intervention. This model was mapped to statistically significant changes in MNCH intermediate outcomes to determine the cost of improvements in MNCH indicators. Sensitivity analyses were conducted to estimate costs in alternate scenarios. The m-health intervention cost $29.33 per user and $4.33 per successful contact. The average cost for each user experiencing a change in an MNCH indicator ranged from $67 to $355. The sensitivity analyses showed that cost per user could be reduced by 48% if the service were to operate at full capacity. We believe that the intervention, operating at scale, has potential to be a cost-effective method for improving maternal and child health indicators.

  10. Scale Matters: A Cost-Outcome Analysis of an m-Health Intervention in Malawi

    PubMed Central

    Bancroft, Emily; Rajagopal, Sharanya; O'Toole, Maggie; Levin, Ann

    2016-01-01

    Abstract Background: The primary objectives of this study are to determine cost per user and cost per contact with users of a mobile health (m-health) intervention. The secondary objectives are to map costs to changes in maternal, newborn, and child health (MNCH) and to estimate costs of alternate implementation and usage scenarios. Materials and Methods: A base cost model, constructed from recurrent costs and selected capital costs, was used to estimate average cost per user and per contact of an m-health intervention. This model was mapped to statistically significant changes in MNCH intermediate outcomes to determine the cost of improvements in MNCH indicators. Sensitivity analyses were conducted to estimate costs in alternate scenarios. Results: The m-health intervention cost $29.33 per user and $4.33 per successful contact. The average cost for each user experiencing a change in an MNCH indicator ranged from $67 to $355. The sensitivity analyses showed that cost per user could be reduced by 48% if the service were to operate at full capacity. Conclusions: We believe that the intervention, operating at scale, has potential to be a cost-effective method for improving maternal and child health indicators. PMID:26348994

  11. The Airfloat HL project. [design analysis of airships and lift devices for materials handling

    NASA Technical Reports Server (NTRS)

    Mowforth, E.

    1975-01-01

    A design study is described for a large low-cost rigid airship intended primarily for the movement of large indivisible loads (cargo) between industrial sites. A survey of the ship and its overall performance is followed by accounts of the operational procedures for the above function and for an alternative application to unit module transfer between fixed terminals. A final section indicates the estimated costs of construction and operation. Safety factors are also considered. Lifting devices such as winches, hoists are shown and described, and airship configurations are also shown.

  12. Shoestring Budget Radio Astronomy

    NASA Astrophysics Data System (ADS)

    Hoot, John E.

    2017-06-01

    The commercial exploitation of microwave frequencies for cellular, WiFi, Bluetooth, HDTV, and satellite digital media transmission has brought down the cost of the components required to build an effective radio telescope to the point where, for the cost of a good eyepiece, you can construct and operate a radio telescope. This paper sets forth a family of designs for 1421 MHz telescopes. It also proposes a method by which operators of such instruments can aggregate and archive data via the Internet. With 90 or so instruments it will be possible to survey the entire radio sky for transients with a 24 hour cadence.

  13. Shoestring Budget Radio Astronomy (Abstract)

    NASA Astrophysics Data System (ADS)

    Hoot, J. E.

    2017-12-01

    (Abstract only) The commercial exploitation of microwave frequencies for cellular, WiFi, Bluetooth, HDTV, and satellite digital media transmission has brought down the cost of the components required to build an effective radio telescope to the point where, for the cost of a good eyepiece, you can construct and operate a radio telescope. This paper sets forth a family of designs for 1421 MHz telescopes. It also proposes a method by which operators of such instruments can aggregate and archive data via the Internet. With 90 or so instruments it will be possible to survey the entire radio sky for transients with a 24 hour cadence.

  14. Experiments in a Combustion-Driven Shock Tube with an Area Change

    NASA Astrophysics Data System (ADS)

    Schmidt, B. E.; Bobbitt, B.; Parziale, N. J.; Shepherd, J. E.

    Shock tubes are versatile and useful tools for studying high temperature gas dynamics and the production of hypervelocity flows. High shock speeds are desirable for creating higher enthalpy, pressure, and temperature in the test gas which makes the study of thermo-chemical effects on fluid dynamics possible. Independent of construction and operational cost, free-piston drivers, such as the one used in the T5 facility at Caltech, give the best performance [3]. The high operational cost and long turnaround time of such a facility make a more economical option desirable for smaller-scale testing.

  15. Selection criteria for using nighttime construction and maintenance operations : appendices.

    DOT National Transportation Integrated Search

    2003-05-01

    Appendix A: literature review and bibliography of related research; : Appendix B: survey instrument; : Appendix C: survey results; : Appendix D: Oregon crash analysis; : Appendix E: userguide to estimate road user costs; : Appendix F: the study of wo...

  16. Constructing a low-cost ground-vehicle driving simulator at an airport

    DOT National Transportation Integrated Search

    2007-09-01

    Vehicle/pedestrian deviations (VPDs) occur due to many factors, such as the drivers knowledge : of airport layout, required communications, and other operational procedures. To address and : create awareness of these issues, research has been cond...

  17. Making a Splash.

    ERIC Educational Resources Information Center

    Maland, Jim

    1998-01-01

    Presents a 10-step process that allows swimming-pool owners to objectively scrutinize their existing facility's needs, construction, and operation and maintenance budgets before renovating a structurally deficient or costly pool. Four examples of problems involving pool-renovation decision making are highlighted. (GR)

  18. Evaluation of bypass lane safety, operations, and design in Kansas.

    DOT National Transportation Integrated Search

    2015-08-01

    The construction of bypass lanes at rural intersections has typically been considered a low-cost highway safety : improvement by the transportation community. However, this needs to be quantitatively evaluated so that decisions can be made : on wheth...

  19. A Guide to Energy Savings - For the Poultry Producer.

    ERIC Educational Resources Information Center

    Benson, Verel W.

    This booklet gives a brief overview of energy use in poultry operations and gives examples of cutting costs of brooding, lighting, ventilation, feeding, watering, waste removal, housing design, construction and maintenance. Finally, energy use recordkeeping is discussed. (BB)

  20. Proof of concept : biocement for road repair.

    DOT National Transportation Integrated Search

    2015-03-01

    Road repair is an expensive operation every year. This cost can be greatly reduced if waste materials from the mining and biofuel : industries can be used to substitute conventional materials for road repair or construction. The objective of this pro...

  1. A desire named streetcar : fantasy and fact in rail transit planning

    DOT National Transportation Integrated Search

    1992-06-30

    The forecasts that led local officials in eight U.S. cities to advocate rail transit projects over competing, less capital-intensive options grossly overestimated rail transit ridership and underestimated rail construction costs and operating expense...

  2. Benefit Evaluation of Implementing BIM in Construction Projects

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  3. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  4. Assessing administrative costs of mental health and substance abuse services.

    PubMed

    Broyles, Robert W; Narine, Lutchmie; Robertson, Madeline J

    2004-05-01

    Increasing competition in the market for mental health and substance abuse MHSA services and the potential to realize significant administrative savings have created an imperative to monitor, evaluate, and control spending on administrative functions. This paper develops a generic model that evaluates spending on administrative personnel by a group of providers. The precision of the model is demonstrated by examining a set of data assembled from five MHSA service providers. The model examines a differential cost construction derived from inter-facility comparisons of administrative expenses. After controlling for the scale of operations, the results enable MHSA programs to control the efficiency of administrative personnel and related rates of compensation. The results indicate that the efficiency of using the administrative complement and the scale of operations represent the lion's share of the total differential cost. The analysis also indicates that a modest improvement in the use of administrative personnel results in substantial cost savings, an increase in the net cash flow derived from operations, an improvement in the fiscal performance of the provider, and a decline in opportunity costs that assume the form of foregone direct patient care.

  5. Multimodal system planning technique : an analytical approach to peak period operation

    DOT National Transportation Integrated Search

    1995-11-01

    The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...

  6. A statistical analysis of the relationship between land values and freestanding bus facilities.

    DOT National Transportation Integrated Search

    2010-02-01

    Public transit professionals continue to seek methods that offer greater service opportunities, while : not materially increasing the costs of service provision. One strategy is to construct bus transit : centers which operate much like the airline h...

  7. 24 CFR 200.53 - Initial operating funds.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... standards established by the Commissioner for: (a) Accruals for taxes, ground rates, mortgage insurance premiums, and property insurance premiums, during the course of construction; (b) Meeting the cost of... Endorsement Generally Applicable to Multifamily and Health Care Facility Mortgage Insurance Programs; and...

  8. 24 CFR 200.53 - Initial operating funds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... standards established by the Commissioner for: (a) Accruals for taxes, ground rates, mortgage insurance premiums, and property insurance premiums, during the course of construction; (b) Meeting the cost of... Endorsement Generally Applicable to Multifamily and Health Care Facility Mortgage Insurance Programs; and...

  9. Elements of Green.

    ERIC Educational Resources Information Center

    Turckes, Steven; Engelbrecht, Kathie

    2002-01-01

    Discusses incorporating green design into school construction, asserting that schools can improve their impact on the environment and reduce their operating costs while educating people about the value of sustainable design. Addresses energy reduction (including daylighting), site design for low environmental impact, flexible design, indoor air…

  10. Implementation of Hospital Computerized Physician Order Entry Systems in a Rural State: Feasibility and Financial Impact

    PubMed Central

    Ohsfeldt, Robert L.; Ward, Marcia M.; Schneider, John E.; Jaana, Mirou; Miller, Thomas R.; Lei, Yang; Wakefield, Douglas S.

    2005-01-01

    Objective The aim of this study was to estimate the costs of implementing computerized physician order entry (CPOE) systems in hospitals in a rural state and to evaluate the financial implications of statewide CPOE implementation. Methods A simulation model was constructed using estimates of initial and ongoing CPOE costs mapped onto all general hospitals in Iowa by bed quantity and current clinical information system (CIS) status. CPOE cost estimates were obtained from a leading CPOE vendor. Current CIS status was determined through mail survey of Iowa hospitals. Patient care revenue and operating cost data published by the Iowa Hospital Association were used to simulate the financial impact of CPOE adoption on hospitals. Results CPOE implementation would dramatically increase operating costs for rural and critical access hospitals in the absence of substantial costs savings associated with improved efficiency or improved patient safety. For urban and rural referral hospitals, the cost impact is less dramatic but still substantial. However, relatively modest benefits in the form of patient care cost savings or revenue enhancement would be sufficient to offset CPOE costs for these larger hospitals. Conclusion Implementation of CPOE in rural or critical access hospitals may depend on net increase in operating costs. Adoption of CPOE may be financially infeasible for these small hospitals in the absence of increases in hospital payments or ongoing subsidies from third parties. PMID:15492033

  11. Building a 600-Ship Navy: Costs, Time, and Alternative Approaches

    DTIC Science & Technology

    1982-03-01

    distributed-force operations but not currently included in Navy construction plans. These include 12 guided missile aviation cruisers ( CGV ) and 61...guided missile destroyers (DDGY). The CGVs would be equipped With a balanced suite of ship- mounted anti-air, antisubmarine, and antisurface weapons... CGV ) with extensive facilities for supporting V/STOL aircraft. These cruisers would operate with surface action groups and underway replenishment

  12. Adobe, rammed earth and wood: An energy-based environmental analysis of residential construction in Phoenix, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gossen, C.L.

    1996-10-01

    More than 90% of the new single-family dwellings built in the Phoenix Metropolitan Area consists of wood frame construction. Using adobe and rammed earth as alternatives in residential wall construction are the main focus of this study. The study examines the process of home construction, concentrating on the environmental impacts of energy embodied in the four stages: extraction, transportation, construction, and operation. These four stages were applied to three prototypes built in the Phoenix Area throughout one year. The results are compared to determine which has the lowest environmental costs and most likely to benefit sustainability. The study requires amore » comparative analysis rather than a definite choice of a better prototype. The information provides assistance to the builder/designer with options about environmental impacts and the whole energy spectrum. Wherein previous research was based on performance standards of operation, one must also consider environmental impacts and externalities.« less

  13. The Sampling Design of the China Family Panel Studies (CFPS)

    PubMed Central

    Xie, Yu; Lu, Ping

    2018-01-01

    The China Family Panel Studies (CFPS) is an on-going, nearly nationwide, comprehensive, longitudinal social survey that is intended to serve research needs on a large variety of social phenomena in contemporary China. In this paper, we describe the sampling design of the CFPS sample for its 2010 baseline survey and methods for constructing weights to adjust for sampling design and survey nonresponses. Specifically, the CFPS used a multi-stage probability strategy to reduce operation costs and implicit stratification to increase efficiency. Respondents were oversampled in five provinces or administrative equivalents for regional comparisons. We provide operation details for both sampling and weights construction. PMID:29854418

  14. Policy analysis of the budget used in training program for reducing lower back pain among heavy equipment operators in the construction industry: System dynamics approach

    NASA Astrophysics Data System (ADS)

    Vitharana, V. H. P.; Chinda, T.

    2018-04-01

    Lower back pain (LBP), prevalence is high among the heavy equipment operators leading to high compensation cost in the construction industry. It is found that proper training program assists in reducing chances of having LBP. This study, therefore aims to examine different safety related budget available to support LBP related training program for different age group workers, utilizing system dynamics modeling approach. The simulation results show that at least 2.5% of the total budget must be allocated in the safety and health budget to reduce the chances of having LBP cases.

  15. Final environmental assessment: Sacramento Energy Service Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    The Sacramento Area Office (SAO) of the Western Area Power Administration (Western) needs to increase the security of operations, to eliminate overcrowding at the current leased location of the existing facilities, to provide for future growth, to improve efficiency, and to reduce operating costs. The proposed action is to construct an approximate 40,000-square foot building and adjacent parking lot with a Solar Powered Electric Vehicle Charging Station installed to promote use of energy efficient transportation. As funding becomes available and technology develops, additional innovative energy-efficient measures will be incorporated into the building. For example the proposed construction of the Solarmore » Powered Electric Vehicle Charging.« less

  16. Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3. [using a fluidized bed reactor

    NASA Technical Reports Server (NTRS)

    Blocher, J. M., Jr.; Browning, M. F.

    1979-01-01

    The construction and operation of an experimental process system development unit (EPSDU) for the production of granular semiconductor grade silicon by the zinc vapor reduction of silicon tetrachloride in a fluidized bed of seed particles is presented. The construction of the process development unit (PDU) is reported. The PDU consists of four critical units of the EPSDU: the fluidized bed reactor, the reactor by product condenser, the zinc vaporizer, and the electrolytic cell. An experimental wetted wall condenser and its operation are described. Procedures are established for safe handling of SiCl4 leaks and spills from the EPSDU and PDU.

  17. The development and manufacture of wood composite wind turbine rotors

    NASA Technical Reports Server (NTRS)

    Zuteck, M. D.

    1982-01-01

    The physical properties, operational experience, and construction methods of the wood/epoxy composite MOD 0A wind turbine blades are considered. Blades of this type have accumulated over 10,000 hours of successful operation at the Kahuku, Hawaii and Block Island, Rhode Island test sites. That body of experience is summarized and related to the structural concepts and design drivers which motivated the original design and choice of interior layout. Actual manufacturing experience and associated low first unit costs for these blades, as well as projections for high production rates, are presented. Application of these construction techniques to a wide range of other blade sizes is also considered.

  18. Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

    NASA Technical Reports Server (NTRS)

    1979-01-01

    An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

  19. Estimating economic impacts of regulatory changes to U.S. port operations

    DOT National Transportation Integrated Search

    2007-03-01

    This report describes a framework constructed to assist in understanding the long run : impacts of regulations proposed by the US Coast Guard on domestic marine ports. The : port impacts considered pertain to cost, time and reliability. These three f...

  20. TRAINING NUCLEAR TECHNICIANS.

    ERIC Educational Resources Information Center

    KOVNER, EDGAR A.

    PROBLEMS CONFRONTED BY PLANNERS OF NUCLEAR PROGRAMS AT THE TECHNICIAN LEVEL INCLUDE (1) LACK OF PRECEDENT IN CURRICULUM, COURSE OUTLINES, AND GRADUATE PLACEMENT, (2) DIFFICULTY IN DETERMINING COSTS OF LABORATORY CONSTRUCTION, EQUIPMENT, AND OPERATION, AND (3) REQUIREMENT OF ATOMIC ENERGY COMMISSION LICENSES IN NUCLEAR OCCUPATIONS. A 92-SEMESTER…

  1. One with the Environment

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2005-01-01

    As energy costs rise and resources dwindle, schools and universities can benefit greatly by taking an environmentally sensitive approach to construction, renovation and maintenance of facilities. Administrators free up needed budget resources by operating facilities more efficiently. Using sustainable-design strategies can set a good example for…

  2. A cost comparison of traditional drainage and SUDS in Scotland.

    PubMed

    Duffy, A; Jefferies, C; Waddell, G; Shanks, G; Blackwood, D; Watkins, A

    2008-01-01

    The Dunfermline Eastern Expansion (DEX) is a 350 ha mixed development which commenced in 1996. Downstream water quality and flooding issues necessitated a holistic approach to drainage planning and the site has become a European showcase for the application of Sustainable Urban Drainage Systems (SUDS). However, there is minimal data available regarding the real costs of operating and maintaining SUDS to ensure they continue to perform as per their design function. This remains one of the primary barriers to the uptake and adoption of SUDS. This paper reports on what is understood to be the only study in the UK where actual costs of constructing and maintaining SUDS have been compared to an equivalent traditional drainage solution. To compare SUDS costs with traditional drainage, capital and maintenance costs of underground storage chambers of analogous storage volumes were estimated. A whole life costing methodology was then applied to data gathered. The main objective was to produce a reliable and robust cost comparison between SUDS and traditional drainage. The cost analysis is supportive of SUDS and indicates that well designed and maintained SUDS are more cost effective to construct, and cost less to maintain than traditional drainage solutions which are unable to meet the environmental requirements of current legislation. (c) IWA Publishing 2008.

  3. Energy Industry. Industry Study, Spring 2009

    DTIC Science & Technology

    2009-01-01

    and construction was made more attractive by the Energy Policy Act of 2005. Incentives include production tax credits, federal risk insurance to...capital to build and license a nuclear power plant. To compete in a deregulated industry, the production costs for nuclear must be below 2.0 cents...lease or purchase, add up to approximately $270 per kW, adding 1 cent per kWh. The operating costs, including maintenance, land rent and insurance

  4. Management of solid waste

    NASA Astrophysics Data System (ADS)

    Thompson, W. T.; Stinton, L. H.

    1980-04-01

    Compliance with the latest regulatory requirements addressing disposal of radioactive, hazardous, and sanitary solid waste criteria in the selection, design, and operation of solid waste management facilities. Due to the state of flux of these regulatory requirements from EPA and NRC, several waste management options were of solid waste. The current regulatory constraints and the design and operational requirements for construction of both storage and disposal facilities for use in management of DOE-ORO solid waste are highlighted. Capital operational costs are included for both disposal and storage options.

  5. Measures for the reduction of sinter formations in tunnels

    NASA Astrophysics Data System (ADS)

    Harer, Gerhard

    2017-09-01

    A considerable part of the maintenance costs of tunnel structures is related to the inspection, maintenance and repair of the drainage system. The drainage system of tunnels is frequently clogged with Calcium precipitates. Cleaning and water conditioning are costintensive for operating companies. Apart from the direct costs associated with inspection, maintenance and repair works of the drainage system indirect costs are generated, such as by the blocking of the tunnel while inspection, maintenance or repair or by the reduction of the permitted operation speed. Sintering and clogging of the drainage systems is mainly caused by dissolution of cement minerals in concrete and mortar and/or by inadequate design and construction of the drainage system and/or grubby workmanship. With long-term studies and in-situ experiments in Austria traffic tunnels the specific input factors for sinter mechanism have been identified and appropriate counter measures could be defined. In particular modified mix designs for shotcretes and mortars have proven to bring a significant beneficial effect. By means of constructional measures and by the application of hardness stabilizers a further reduction of hard deposits inside the drainage system is achievable. The paper will deal with the specific aspects and will propose adequate counter measures.

  6. A preliminary analysis of recent HVAC energy projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaddy, P.J.; Haake, C.F.

    A typical Government HVAC design over the last 30 years consisted of two oversized (equal tonnage) electric chillers, two oversized (equal NBTU ratings) boilers, an air economizer cycle, a constant air volume system and a central station pneumatic control system. This typical basic layout for plant design has certain advantages such as simplicity and ease to construct throughout the country. The cookie cutter design/build approach suited federal facilities, when utility costs were not a major consideration, in-house maintenance and operations personnel were plentiful and energy conservation was a moral priority and not an economic concern. Those days are history asmore » energy costs have escalated and operating budgets continue to shrink leaving fewer personnel to maintain the same buildings. Advances in HVAC technology and the reduction in costs for energy efficient systems have finally started affecting the Federal Government`s HVAC replacement and new construction designs. This paper is a brief description of three HVAC projects that go outside the traditional government HVAC design parameters. GSA`s Pacific Rim Region, covering the states of Hawaii, California, Nevada, and Arizona, has implemented three HVAC projects utilizing different technologies not normally found in GSA Federal facilities.« less

  7. Developing a cost effective environmental solution for produced water and creating a ''new'' water resource

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doran, Glenn; Leong, Lawrence Y.C.

    2000-05-01

    The project goal is to convert a currently usable by-product of oil production, produced water, into a valuable drinking water resource. The project was located at the Placate Oil Field in Santa Clarita, California, approximately 25 miles north of Los Angeles. The project included a literature review of treatment technologies; preliminary bench-scale studies to refine a planning level cost estimate; and a 10-100 gpm pilot study to develop the conceptual design and cost estimate for a 44,000 bpd treatment facility. A reverse osmosis system was constructed, pilot tested, and the data used to develop a conceptual design and operation ofmore » four operational scenarios, two industrial waters levels and two irrigation/potable water.« less

  8. Clinical process cost analysis.

    PubMed

    Marrin, C A; Johnson, L C; Beggs, V L; Batalden, P B

    1997-09-01

    New systems of reimbursement are exerting enormous pressure on clinicians and hospitals to reduce costs. Using cheaper supplies or reducing the length of stay may be a satisfactory short-term solution, but the best strategy for long-term success is radical reduction of costs by reengineering the processes of care. However, few clinicians or institutions know the actual costs of medical care; nor do they understand, in detail, the activities involved in the delivery of care. Finally, there is no accepted method for linking the two. Clinical process cost analysis begins with the construction of a detailed flow diagram incorporating each activity in the process of care. The cost of each activity is then calculated, and the two are linked. This technique was applied to Diagnosis Related Group 75 to analyze the real costs of the operative treatment of lung cancer at one institution. Total costs varied between $6,400 and $7,700. The major driver of costs was personnel time, which accounted for 55% of the total. Forty percent of the total cost was incurred in the operating room. The cost of care decreased progressively during hospitalization. Clinical process cost analysis provides detailed information about the costs and processes of care. The insights thus obtained may be used to reduce costs by reengineering the process.

  9. The open prototype for educational NanoSats: Fixing the other side of the small satellite cost equation

    NASA Astrophysics Data System (ADS)

    Berk, Josh; Straub, Jeremy; Whalen, David

    Government supported nano-satellite launch programs and emerging commercial small satellite launch services are reducing the cost of access to space for educational and other CubeSat projects. The cost and complexity of designing and building these satellites remains a vexing complication for many would be CubeSat aspirants. The Open Prototype for Educational NanoSats (OPEN), a proposed nano-satellite development platform, is described in this paper. OPEN endeavors to reduce the costs and risks associated with educational, government and commercial nano-satellite development. OPEN provides free and publicly available plans for building, testing and operating a versatile, low-cost satellite, based on the standardized CubeSat form-factor. OPEN consists of public-domain educational reference plans, complete with engineering schematics, CAD files, construction and test instructions as well as ancillary reference materials relevant to satellite building and operation. By making the plan, to produce a small but capable spacecraft freely available, OPEN seeks to lower the barriers to access on the other side (non-launch costs) of the satellite cost equation.

  10. Improving operating room schedules.

    PubMed

    Li, Fei; Gupta, Diwakar; Potthoff, Sandra

    2016-09-01

    Operating rooms (ORs) in US hospitals are costly to staff, generate about 70 % of a hospital's revenues, and operate at a staffed-capacity utilization of 60-70 %. Many hospitals allocate blocks of OR time to individual or groups of surgeons as guaranteed allocation, who book surgeries one at a time in their blocks. The booking procedure frequently results in unused time between surgeries. Realizing that this presents an opportunity to improve OR utilization, hospitals manually reschedule surgery start times one or two days before each day of surgical operations. The purpose of rescheduling is to decrease OR staffing costs, which are determined by the number of concurrently staffed ORs. We formulate the rescheduling problem as a variant of the bin-packing problem with interrelated items, which are the surgeries performed by the same surgeon. We develop a lower bound (LB) construction algorithm and prove that the LB is at least (2/3) of the optimal staffing cost. A key feature of our approach is that we allow hospitals to have two shift lengths. Our analytical results form the basis of a branch-and-bound algorithm, which we test on data obtained from three hospitals. Experiments show that rescheduling saves significant staffing costs.

  11. A Sustainable Approach

    ERIC Educational Resources Information Center

    del Monte, Betsy

    2006-01-01

    Many school districts and education institutions are making green facilities a greater priority. Green buildings, also called sustainable or high-performance buildings, can provide many advantages for schools and the people who use them. They cost less to operate, last longer and provide a better learning environment. Constructing sustainable…

  12. 47 CFR 90.713 - Entry criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., commercial use to non-Government, Phase I applicants. Applicants for these nationwide channel blocks must... four years of the license term; i.e., that the applicant has net current assets sufficient to cover... application showing net current assets sufficient to meet estimated construction and operating costs. An...

  13. Solar power satellite system definition study. Volume 5, phase 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    An analysis of the solar power satellite system is presented. Performance, cost, and operational characteristics are assessed. The photovoltaic system is described and investigated. Alternative construction concepts are discussed. The structural bay configuration is presented along with the antenna structure options.

  14. Solar energy development and application in Japan - An outsiders assessment

    NASA Astrophysics Data System (ADS)

    Knopp, E.

    1982-04-01

    The Sunshine Project was initiated in Japan in 1974 in order to develop energy resources to meet future needs. The solar program consists of three categories; solar home construction, the construction and operation of a 1000 kWe capacity solar thermal power generation plant, and the development of a photovoltaic system with a cost per watt reduced to 1/100 of the present cost. Low interest loans to promote the use of solar systems have resulted in the installation of one million solar collectors. Solar water heaters produced have a 2 sq m collection area and a 200 liters water storage capacity, and an evacuated tube collector with an efficiency of 64% has been developed. Work is being devoted to the production of a 50 times concentrating tracking circular Fresnel-type photovoltaic device, and a solar driven cooling system with a 5.35 kW capacity, which operates with a highly efficient freon vapor expander, has been developed. The problem of collected heat storage is being tested and assessed.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, Kevin; Anasti, William; Fang, Yichuan

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6more » – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.« less

  16. Construction of low-cost, Mod-OA wood composite wind turbine blades

    NASA Technical Reports Server (NTRS)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  17. Satellite solar power - Will it pay off

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1977-01-01

    A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

  18. Special Operations Forces Aviation on a Shoestring Budget: An Effectiveness Analysis of Light and Medium Fixed Wing Aircraft

    DTIC Science & Technology

    2012-12-01

    C2 Command and Control CAIG Cost Analysis Improvement Group CAS Close Air Support CASA Construcciones Aeronáuticas SA CLS Contract...Commercially Available Off-the-Shelf Commercially available off-the shelf (COTS) is defined as any item of supply (including construction material...uses are found for old weapons that were constructed for use in industrial war against soldiers and heavy armament. 6. The sides are mostly non

  19. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, whichmore » were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.« less

  20. Mess in mass transit: though demand is up, the service is down

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-07-16

    Mass transit systems (bus and rail), in poor mechanical and physical condition, are facing an economic crisis. Most industries that had been constructing new rail or bus equipment have now quit production completely or nearly so. San Diego is buying trolleys for its 16-mile line to the Mexican border, on which construction will begin in late 1979, from a West German supplier. The background of how the US got into this situation is reviewed. American's love affair with the automobile put the transit systems in financial trouble with poor ridership, and now the companies are afraid to reconstruct, thinking perhapsmore » Americans will revert to the automobile if gasoline again becomes plentiful. As the US attempts to remedy the transit situation, there should be a burden sharing between local and Federal governments. Local transit authorities should carry the operating costs, but even if they are heavily traveled, fares meet only 48% of operating costs. Therefore, communities will have to find ways to raise money in order to keep the systems running. The Carter Administration did not seize on mass transit as a means of conserving gasoline, but President Carter did say that part of the windfall tax on oil companies would be set aside for mass transport. But some progress is noted: Baltimore is digging its first subway; Buffalo began construction of a 6.5-mile subway and elevated-transit system; and Atlanta put into operation the first 6.7-mile segment of MARTA. Improvisions in many cities are noted, such as, leasing commercial buses and pressing school buses into operation. (MCW)« less

  1. Life-cycle Economic and Environmental Effects of Green, Gray and Hybrid Stormwater Infrastructure

    NASA Astrophysics Data System (ADS)

    Stokes-Draut, J. R.; Taptich, M. N.; Horvath, A.

    2016-12-01

    Cities throughout the U.S. are seeking efficient ways to manage stormwater for many reasons, including flood control, pollution management, water supply augmentation and to prepare for a changing climate. Traditionally, cities have relied primarily on gray infrastructure, namely sewers, storage and treatment facilities. In these systems, urban runoff, its volume increasing as impervious surfaces expand, is channeled to a wastewater plant where it is mixed with raw sewage prior to treatment or it is discharged, generally untreated, to local water bodies. These facilities are inflexible and expensive to build and maintain. Many systems are deteriorating and/or approaching, if not exceeding, their design capacity. Increasingly, more innovative approaches that integrate stormwater management into the natural environment and that make sense at both local and regional scales are sought. Identifying the best stormwater solution will require evaluating the life-cycle economic costs associated with these alternatives, including costs associated with construction, operation, and maintenance including regulatory and permitting costs, financing, as well as other indirect costs (e.g., avoided wastewater processing or system capacity expansion, increased property value) and non-economic co-benefits (i.e, aesthetics, habitat provision). Beyond conventional life-cycle costing, applying life-cycle assessment (LCA) will contribute to more holistic and sustainable decision-making. LCA can be used to quantitatively track energy use, greenhouse gas emissions, and other environmental effects associated with constructing, operating, and maintaining green and gray infrastructure, including supply chain contributions. We will present the current state of knowledge for implementing life-cycle costing and LCA into stormwater management decisions for green, gray and hybrid infrastructure.

  2. Noise Costs from Road Transport

    NASA Astrophysics Data System (ADS)

    Margorínová, Martina; Trojanová, Mária; Decký, Martin; Remišová, Eva

    2018-06-01

    Building and improving road infrastructure in Slovakia is currently influenced by the amount of state funding. Therefore, it is necessary to determine the effectiveness of each proposed solution of road project, which is based on life-cycle costs. Besides capital costs, social costs are also important, which valued the negative impacts due to road construction and operation on road users, the environment, and the population living in the affected area. Some components of social costs have shortcomings in quantifying and valuating, which need to be resolved. The one of important components which affects human health and the value of an area, and have some shortcomings are noise costs. Improvement of this component will lead to more accurate valuation of economic efficiency of roads.

  3. Comprehensive Anti-error Study on Power Grid Dispatching Based on Regional Regulation and Integration

    NASA Astrophysics Data System (ADS)

    Zhang, Yunju; Chen, Zhongyi; Guo, Ming; Lin, Shunsheng; Yan, Yinyang

    2018-01-01

    With the large capacity of the power system, the development trend of the large unit and the high voltage, the scheduling operation is becoming more frequent and complicated, and the probability of operation error increases. This paper aims at the problem of the lack of anti-error function, single scheduling function and low working efficiency for technical support system in regional regulation and integration, the integrated construction of the error prevention of the integrated architecture of the system of dispatching anti - error of dispatching anti - error of power network based on cloud computing has been proposed. Integrated system of error prevention of Energy Management System, EMS, and Operation Management System, OMS have been constructed either. The system architecture has good scalability and adaptability, which can improve the computational efficiency, reduce the cost of system operation and maintenance, enhance the ability of regional regulation and anti-error checking with broad development prospects.

  4. Methane digester for wastewater grown aquatic plants. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-01-01

    The purpose of this project was to build and test a small-scale, prototype anaerobic digester using wastewater grown aquatic plants as feed stock. Two 150 gal. digesters of the horizontal ''bag'' shape were constructed and fed with water hyacinths and duckweed plants grown on wastewater. Bio-films were added to increase methane bacteria surface attachment area, and solar heating was used to increase operating temperatures. Repeated difficulties were encountered with the low cost materials and construction techniques used, causing leaks of liquids and methane gas, and in the solar heat exchanger. As a consequence, no reliable data were obtained on performance.more » Due to an inadequate budget, the project was terminated without making construction changes needed to properly operate the system for a long period of time. 15 refs., 7 figs.« less

  5. Feasibility study of a magnetic fusion production reactor

    NASA Astrophysics Data System (ADS)

    Moir, R. W.

    1986-12-01

    A magnetic fusion reactor can produce 10.8 kg of tritium at a fusion power of only 400 MW —an order of magnitude lower power than that of a fission production reactor. Alternatively, the same fusion reactor can produce 995 kg of plutonium. Either a tokamak or a tandem mirror production plant can be used for this purpose; the cost is estimated at about 1.4 billion (1982 dollars) in either case. (The direct costs are estimated at 1.1 billion.) The production cost is calculated to be 22,000/g for tritium and 260/g for plutonium of quite high purity (1%240Pu). Because of the lack of demonstrated technology, such a plant could not be constructed today without significant risk. However, good progress is being made in fusion technology and, although success in magnetic fusion science and engineering is hard to predict with assurance, it seems possible that the physics basis and much of the needed technology could be demonstrated in facilities now under construction. Most of the remaining technology could be demonstrated in the early 1990s in a fusion test reactor of a few tens of megawatts. If the Magnetic Fusion Energy Program constructs a fusion test reactor of approximately 400 MW of fusion power as a next step in fusion power development, such a facility could be used later as a production reactor in a spinoff application. A construction decision in the late 1980s could result in an operating production reactor in the late 1990s. A magnetic fusion production reactor (MFPR) has four potential advantages over a fission production reactor: (1) no fissile material input is needed; (2) no fissioning exists in the tritium mode and very low fissioning exists in the plutonium mode thus avoiding the meltdown hazard; (3) the cost will probably be lower because of the smaller thermal power required; (4) and no reprocessing plant is needed in the tritium mode. The MFPR also has two disadvantages: (1) it will be more costly to operate because it consumes rather than sells electricity, and (2) there is a risk of not meeting the design goals.

  6. Construction and startup performance of the Miamisburg salt-gradient solar pond

    NASA Astrophysics Data System (ADS)

    Wittenberg, L. J.; Harris, M. J.

    1981-02-01

    An account is given of the construction and 1.5 years of operation of the Miamisburg, Ohio salt-gradient solar pond which, with 2020 sq m, is the largest solar collector in the U.S. The 18% sodium chloride solution pond has reached storage temperatures of 64 C in July and 28 C in February. Under steady-state conditions, conservative heat-yield estimates on the order of 962 million Btu have been made. The heat is used to warm-up a summer outdoor swimming pool and in winter a recreational building. Installation costs were only $35/sq m, and heat costs based on a 15-year depreciation of installation costs is below that of fuel oil heating, at $9.45 per million Btu. Further study is recommended for maintenance of water clarity, metallic component corrosion and assurance of pond water containment.

  7. Quantifying impact of port truck traffic on highway operations using GPS-based speed data.

    DOT National Transportation Integrated Search

    2015-05-01

    The introduction of mega-ships (i.e. post-Panamax vessels) presented an opportunity for ports to be even more : competitive and cost-eective. For example, the construction and investment commitment of over $ 3.45 billion : between 2013 and 2018 in...

  8. Deep Space Telecommunications

    NASA Technical Reports Server (NTRS)

    Kuiper, T. B. H.; Resch, G. M.

    2000-01-01

    The increasing load on NASA's deep Space Network, the new capabilities for deep space missions inherent in a next-generation radio telescope, and the potential of new telescope technology for reducing construction and operation costs suggest a natural marriage between radio astronomy and deep space telecommunications in developing advanced radio telescope concepts.

  9. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...

  10. Cost analysis of the surgical treatment of fractures of the proximal humerus: an evaluation of the determinants of cost and comparison of the institutional cost of treatment with the national tariff.

    PubMed

    Sabharwal, S; Carter, A W; Rashid, A; Darzi, A; Reilly, P; Gupte, C M

    2016-02-01

    The aims of this study were to estimate the cost of surgical treatment of fractures of the proximal humerus using a micro-costing methodology, contrast this cost with the national reimbursement tariff and establish the major determinants of cost. A detailed inpatient treatment pathway was constructed using semi-structured interviews with 32 members of hospital staff. Its content validity was established through a Delphi panel evaluation. Costs were calculated using time-driven activity-based costing (TDABC) and sensitivity analysis was performed to evaluate the determinants of cost The mean cost of the different surgical treatments was estimated to be £3282. Although this represented a profit of £1138 against the national tariff, hemiarthroplasty as a treatment choice resulted in a net loss of £952. Choice of implant and theatre staffing were the largest cost drivers. Operating theatre delays of more than one hour resulted in a loss of income Our findings indicate that the national tariff does not accurately represent the cost of treatment for this condition. Effective use of the operating theatre and implant discounting are likely to be more effective cost containment approaches than control of bed-day costs. This cost analysis of fractures of the proximal humerus reinforces the limitations of the national tariff within the English National Health Service, and underlines the importance of effective use of the operating theatre, as well as appropriate implant procurement where controlling costs of treatment is concerned. ©2016 The British Editorial Society of Bone & Joint Surgery.

  11. Societal costs in displaced transverse olecranon fractures: using decision analysis tools to find the most cost-effective strategy between tension band wiring and locked plating.

    PubMed

    Francis, Tittu; Washington, Travis; Srivastava, Karan; Moutzouros, Vasilios; Makhni, Eric C; Hakeos, William

    2017-11-01

    Tension band wiring (TBW) and locked plating are common treatment options for Mayo IIA olecranon fractures. Clinical trials have shown excellent functional outcomes with both techniques. Although TBW implants are significantly less expensive than a locked olecranon plate, TBW often requires an additional operation for implant removal. To choose the most cost-effective treatment strategy, surgeons must understand how implant costs and return to the operating room influence the most cost-effective strategy. This cost-effective analysis study explored the optimal treatment strategies by using decision analysis tools. An expected-value decision tree was constructed to estimate costs based on the 2 implant choices. Values for critical variables, such as implant removal rate, were obtained from the literature. A Monte Carlo simulation consisting of 100,000 trials was used to incorporate variability in medical costs and implant removal rates. Sensitivity analysis and strategy tables were used to show how different variables influence the most cost-effective strategy. TBW was the most cost-effective strategy, with a cost savings of approximately $1300. TBW was also the dominant strategy by being the most cost-effective solution in 63% of the Monte Carlo trials. Sensitivity analysis identified implant costs for plate fixation and surgical costs for implant removal as the most sensitive parameters influencing the cost-effective strategy. Strategy tables showed the most cost-effective solution as 2 parameters vary simultaneously. TBW is the most cost-effective strategy in treating Mayo IIA olecranon fractures despite a higher rate of return to the operating room. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  12. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    NASA Astrophysics Data System (ADS)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  13. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    NASA Astrophysics Data System (ADS)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  14. Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade)

    DTIC Science & Technology

    2013-12-01

    MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other PAUC - Program Acquisition Unit Cost PB - President’s...and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be Determined TY - Then Year UCR - Unit Cost Reporting AWACS Blk...Objective and Threshold, and Current Estimate for IOT&E milestone have been corrected from June 2011 to June 2012, to reflect the actual date of

  15. Space manufacturing in the construction of solar power satellites

    NASA Astrophysics Data System (ADS)

    Ruth, J.; Westphal, W.

    This paper deals with ongoing research work concerning energy budget and cost of the solar Satellite Power System (SPS). The fundamental model of such a total system including ground and space facilities, transportation vehicles, power satellites and rectennas is presented. The main purpose of this model is to examine the applicability of different construction scenarios to allow comparison under nearly identical constraints. Using this model in a first attempt the blankets—meaning the main part of the space segment by weight, energy investment needs and cost—are chosen representatively for the energy and cost comparison of two construction alternatives of the same SPS concept. These construction alternatives are defined just by ground and space based manufacturing of the solar blankets, while all other subsystems, operations and the transportation profiles are considered to be kept the same. It can be shown that the energy "payback" time does not only depend on the SPS concept selected but also very much on the construction and implementation scenario. The cost comparison of these alternative approaches presents not very significant differences but advantages for the space manufacturing option with potential higher differences for a less conservative approach which may apply benefits of space manufacturing meaning, for example, considerable mass savings in space. Some preliminary results are discussed and an outlook is given over the next steps to be investigated, comprising the extension of the fundamental model to include use of lunar raw materials.

  16. Spacecraft control center automation using the generic inferential executor (GENIE)

    NASA Technical Reports Server (NTRS)

    Hartley, Jonathan; Luczak, Ed; Stump, Doug

    1996-01-01

    The increasing requirement to dramatically reduce the cost of mission operations led to increased emphasis on automation technology. The expert system technology used at the Goddard Space Flight Center (MD) is currently being applied to the automation of spacecraft control center activities. The generic inferential executor (GENIE) is a tool which allows pass automation applications to be constructed. The pass script templates constructed encode the tasks necessary to mimic flight operations team interactions with the spacecraft during a pass. These templates can be configured with data specific to a particular pass. Animated graphical displays illustrate the progress during the pass. The first GENIE application automates passes of the solar, anomalous and magnetospheric particle explorer (SAMPEX) spacecraft.

  17. Feasibility study for the construction of a new LNG receiving terminal. Turkey. Volume 1. Export trade information. [LNG (liquified natural gas)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-01

    The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 1 is divided into the following sections: (1) Introduction; (2) Summary and Conclusions; (3) Design Basis; (4) Site Evaluation; (5) LNG Terminal Design; (6) Major Equipment and Instrumentation; (7) Marine Operations; (8) Safety Considerations; (9) Environmental Review; (10) Preliminary Project Execution Strategy; (11) Cost Estimates; (12) Project Master Schedule; (13) Economic Analysis; (14)more » Financing; (15) Future Work.« less

  18. Low cost silicon solar array project silicon materials task: Establishment of the feasibility of a process capable of low-cost, high volume production of silane (step 1) and the pyrolysis of silane to semiconductor-grade silicon (step 2)

    NASA Technical Reports Server (NTRS)

    Breneman, W. C.; Farrier, E. G.; Rexer, J.

    1977-01-01

    Extended operation of a small process-development unit routinely produced high quality silane in 97+% yield from dichlorosilane. The production rate was consistent with design loadings for the fractionating column and for the redistribution reactor. A glass fluid-bed reactor was constructed for room temperature operation. The behavior of a bed of silcon particles was observed as a function of various feedstocks, component configurations, and operating conditions. For operating modes other than spouting, the bed behaved in an erratic and unstable manner. A method was developed for casting molten silicon powder into crack-free solid pellets for process evaluation. The silicon powder was melted and cast into thin walled quartz tubes that sacrificially broke on cooling.

  19. Financing Strategies For A Nuclear Fuel Cycle Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Shropshire; Sharon Chandler

    2006-07-01

    To help meet the nation’s energy needs, recycling of partially used nuclear fuel is required to close the nuclear fuel cycle, but implementing this step will require considerable investment. This report evaluates financing scenarios for integrating recycling facilities into the nuclear fuel cycle. A range of options from fully government owned to fully private owned were evaluated using DPL (Decision Programming Language 6.0), which can systematically optimize outcomes based on user-defined criteria (e.g., lowest lifecycle cost, lowest unit cost). This evaluation concludes that the lowest unit costs and lifetime costs are found for a fully government-owned financing strategy, due tomore » government forgiveness of debt as sunk costs. However, this does not mean that the facilities should necessarily be constructed and operated by the government. The costs for hybrid combinations of public and private (commercial) financed options can compete under some circumstances with the costs of the government option. This analysis shows that commercial operations have potential to be economical, but there is presently no incentive for private industry involvement. The Nuclear Waste Policy Act (NWPA) currently establishes government ownership of partially used commercial nuclear fuel. In addition, the recently announced Global Nuclear Energy Partnership (GNEP) suggests fuels from several countries will be recycled in the United States as part of an international governmental agreement; this also assumes government ownership. Overwhelmingly, uncertainty in annual facility capacity led to the greatest variations in unit costs necessary for recovery of operating and capital expenditures; the ability to determine annual capacity will be a driving factor in setting unit costs. For private ventures, the costs of capital, especially equity interest rates, dominate the balance sheet; and the annual operating costs, forgiveness of debt, and overnight costs dominate the costs computed for the government case. The uncertainty in operations, leading to lower than optimal processing rates (or annual plant throughput), is the most detrimental issue to achieving low unit costs. Conversely, lowering debt interest rates and the required return on investments can reduce costs for private industry.« less

  20. A study in cost analysis of aggregate production as depending on drilling and blasting design

    NASA Astrophysics Data System (ADS)

    Bilim, Niyazi; Çelik, Arif; Kekeç, Bilgehan

    2017-10-01

    Since aggregate production has vital importance for many engineering projects-such as construction, highway and plant-mixed concrete production-this study was undertaken to determine how the costs for such production are affected by the design of drilling and blasting processes used. Aggregates are used in the production of concrete and asphalt, which are critical resources for the construction sector. The ongoing population increase and the growth of living standards around the world drive the increasing demand for these products. As demand grows, competition has naturally arisen among producers in the industry. Competition in the market has directly affected prices, which leads to the need for new measures and cost analysis on production costs. The cost calculation is one of the most important parameters in mining activities. Aggregate production operations include drilling, blasting, secondary crushing (if necessary), loading, hauling and crushing-screening, and each of these factors affects cost. In this study, drilling and blasting design parameters (such as hole diameter, hole depth, hole distance and burden) were investigated and evaluated for their effect on the total cost of quarrying these products, based on a particular quarry selected for this research. As the result of evaluation, the parameters actually driving costs have been identified, and their effects on the cost have been determined. In addition, some suggestions are presented regarding production design which may lead to avoiding increased production costs.

  1. The Road to a Green District

    ERIC Educational Resources Information Center

    Gutter, Rachel; Knupp, Emily

    2011-01-01

    Green design, green construction, and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School in…

  2. The Road to a Green District

    ERIC Educational Resources Information Center

    Gutter, Rachel; Knupp, Emily

    2010-01-01

    Green design, green construction and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School can be…

  3. Money on Your Mind

    ERIC Educational Resources Information Center

    Hall, Julie

    2008-01-01

    In today's economic climate, Americans must find creative ways to do more with less. School and university administrators are challenged with stretching budgets to compensate for the increased costs of construction, maintenance and operations. Furniture is a tempting place to save money. It is one of the last things put in place in a construction…

  4. Costs and Benefits of a Mid-Continent Expansion of Loran-C

    DOT National Transportation Integrated Search

    1979-03-01

    Loran-C chains currently in operation or approved for construction will soon cover not only the U.S. coastal and Great Lakes waters, but also 63 percent of the land area and 92 percent of the population of the contiguous 48 states. The mid-continent ...

  5. 47 CFR 27.1170 - Payment issues.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... emission designator. If a prior coordination notice (PCN) under § 101.103(d) of this chapter is prepared... Bands Cost-Sharing Policies Governing Microwave Relocation from the 2110-2150 Mhz and 2160-2200 Mhz Bands § 27.1170 Payment issues. Prior to initiating operations for a newly constructed site or modified...

  6. United States Department of Defense Agency Financial Report for Fiscal Year 2013. Financial Section

    DTIC Science & Technology

    2013-01-01

    capacity for operating landfills and life expectancy in years for all other assets. The Department expenses the full cost to clean up contamination for...construction, and rehabilitation projects on inland waterways. The BFS manages and invests for the Trust Fund. Defense Commissary Agency Surcharge Trust

  7. Computer Review Can Cut HVAC Energy Use

    ERIC Educational Resources Information Center

    McClure, Charles J. R.

    1974-01-01

    A computerized review of construction bidding documents, usually done by a consulting engineer, can reveal how much money it will cost to operate various alternative types of HVAC equipment over a school's lifetime. The review should include a computerized load calculation, energy systems flow diagram, control system analysis, and a computerized…

  8. Swarming Robot Design, Construction and Software Implementation

    NASA Technical Reports Server (NTRS)

    Stolleis, Karl A.

    2014-01-01

    In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.

  9. The Dynairship. [structural design criteria and feasibility analysis of an airplane - airship

    NASA Technical Reports Server (NTRS)

    Miller, W. M., Jr.

    1975-01-01

    A feasibility analysis for the construction and use of a combination airplane-airship named 'Dynairship' is undertaken. Payload capacities, fuel consumption, and the structural design of the craft are discussed and compared to a conventional commercial aircraft (a Boeing 747). Cost estimates of construction and operation of the craft are also discussed. The various uses of the craft are examined (i.e, in police work, materials handling, and ocean surveillance), and aerodynamic configurations and photographs are shown.

  10. Restless Tuneup of High-Fidelity Qubit Gates

    NASA Astrophysics Data System (ADS)

    Rol, M. A.; Bultink, C. C.; O'Brien, T. E.; de Jong, S. R.; Theis, L. S.; Fu, X.; Luthi, F.; Vermeulen, R. F. L.; de Sterke, J. C.; Bruno, A.; Deurloo, D.; Schouten, R. N.; Wilhelm, F. K.; DiCarlo, L.

    2017-04-01

    We present a tuneup protocol for qubit gates with tenfold speedup over traditional methods reliant on qubit initialization by energy relaxation. This speedup is achieved by constructing a cost function for Nelder-Mead optimization from real-time correlation of nondemolition measurements interleaving gate operations without pause. Applying the protocol on a transmon qubit achieves 0.999 average Clifford fidelity in one minute, as independently verified using randomized benchmarking and gate-set tomography. The adjustable sensitivity of the cost function allows the detection of fractional changes in the gate error with a nearly constant signal-to-noise ratio. The restless concept demonstrated can be readily extended to the tuneup of two-qubit gates and measurement operations.

  11. Financial assessment of the Space Operations Center as a Private Business Venture

    NASA Technical Reports Server (NTRS)

    Simon, M.

    1982-01-01

    The possibility of private financing and operation of the Space Operations Center (SOC) is considered as an alternative to SOC development by the government. A hypothetical revenue model for SOC services is constructed and is compared with NASA estimates of SOC development and operating costs. A present value analysis based on a 1985 to 2000 investment horizon shows a potential for substantial profit in a private SOC venture, although the possibility of large losses is not discounted. Present value estimates range from $8.6 billion down to a low minus $3.3 billion.

  12. Experience with modified aerospace reliability and quality assurance method for wind turbines

    NASA Technical Reports Server (NTRS)

    Klein, W. E.

    1982-01-01

    The SR&QA approach assures that the machine is not hazardous to the public or operating personnel, can operate unattended on a utility grid, demonstrates reliability operation, and helps establish the quality assurance and maintainability requirements for future wind turbine projects. The approach consisted of modified failure modes and effects analysis (FMEA) during the design phase, minimal hardware inspection during parts fabrication, and three simple documents to control activities during machine construction and operation. Five years experience shows that this low cost approach works well enough that it should be considered by others for similar projects.

  13. Theoretical framework of the causes of construction time and cost overruns

    NASA Astrophysics Data System (ADS)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  14. Petroleum Refinery Jobs and Economic Development Impact (JEDI) Model User Reference Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldberg, Marshall

    The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are user-friendly tools utilized to estimate the economic impacts at the local level of constructing and operating fuel and power generation projects for a range of conventional and renewable energy technologies. The JEDI Petroleum Refinery Model User Reference Guide was developed to assist users in employing and understanding the model. This guide provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data utilized in the model. This guide also provides basic instruction on modelmore » add-in features, operation of the model, and a discussion of how the results should be interpreted. Based on project-specific inputs from the user, the model estimates job creation, earning and output (total economic activity) for a given petroleum refinery. This includes the direct, indirect and induced economic impacts to the local economy associated with the refinery's construction and operation phases. Project cost and job data used in the model are derived from the most current cost estimations available. Local direct and indirect economic impacts are estimated using economic multipliers derived from IMPLAN software. By determining the regional economic impacts and job creation for a proposed refinery, the JEDI Petroleum Refinery model can be used to field questions about the added value refineries may bring to the local community.« less

  15. Energy utilization: municipal waste incineration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBeck, M.F.

    An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less

  16. Small hydroelectric power plant for Aztec, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frey, E.W.

    1982-05-01

    Preliminary engineering results and the outcome of other specific studies associated with the establishment of a hydroelectric power plant at Aztec, New Mexico, are presented, with particular emphasis on estimated costs of construction and long-term operation. Four alternative levels of effort were evaluated. Recommendations, based primarily on cost effectiveness, are presented along with material useful as a basis for a possible follow-on Phase II study. At least three levels of effort appear economically attractive alternatives for the city to pursue.

  17. Cost effective management of space venture risks

    NASA Technical Reports Server (NTRS)

    Giuntini, Ronald E.; Storm, Richard E.

    1986-01-01

    The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.

  18. Antenna Electronics Concept for the Next-Generation Very Large Array

    NASA Astrophysics Data System (ADS)

    Beasley, Anthony J.; Jackson, Jim; Selina, Robert

    2017-01-01

    The National Radio Astronomy Observatory (NRAO), in collaboration with its international partners, completed two major projects over the past decade: the sensitivity upgrade for the Karl Jansky Very Large Array (VLA) and the construction of the Atacama Large Millimeter/Sub-Millimeter Array (ALMA). The NRAO is now considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milli-arcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.A number of key technical challenges have been identified for the project. These include cost-effective antenna manufacturing (in the hundreds), suitable wide-band feed and receiver designs, broad-band data transmission, and large-N correlators. Minimizing the overall operations cost is also a fundamental design requirement.The designs of the antenna electronics, reference distribution system, and data transmission system are anticipated to be major construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. Additionally, due to the uncertainty in the feasibility of wideband receivers, advancements in digitizer technology, and budget constraints, the hardware system architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizers.Here, we present the projected performance requirements of the ngVLA, a proposed block diagram for the instrument’s electronics systems, parameter tradeoffs within the system specifications, and areas of technical risk where technical advances may be required for successful production and installation.

  19. Cost variation in a laparoscopic cholecystectomy and the association with outcomes across a single health system: implications for standardization and improved resource utilization.

    PubMed

    Brauer, David G; Hawkins, William G; Strasberg, Steven M; Brunt, L Michael; Jaques, David P; Mercurio, Nicholas R; Hall, Bruce L; Fields, Ryan C

    2015-12-01

    Payers and regulatory bodies are increasingly placing emphasis on cost containment, quality/outcome measurement and transparent reporting. Significant cost variation occurs in many operative procedures without a clear relationship with outcomes. Clear cost-benefit associations will be necessary to justify expenditures in the era of bundled payment structures. All laparoscopic cholecystectomies (LCCKs) performed within a single health system over a 1-year period were analysed for operating room (OR) supply cost. The cost was correlated with American College of Surgeons National Surgical Quality Improvement Program (ACS NSQIP) outcomes. From July 2013 to June 2014, 2178 LCCKs were performed by 55 surgeons at seven hospitals. The median case OR supply cost was $513 ± 156. There was variation in cost between individual surgeons and within an individual surgeon's practice. There was no correlation between cost and ACS NSQIP outcomes. The majority of cost variation was explained by selection of trocar and clip applier constructs. Significant case OR cost variation is present in LCCK across a single health system, and there is no clear association between increased cost and NSQIP outcomes. Placed within the larger context of overall cost, the opportunity exists for improved resource utilization with no obvious risk for a reduction in the quality of care. © 2015 International Hepato-Pancreato-Biliary Association.

  20. Cost variation in a laparoscopic cholecystectomy and the association with outcomes across a single health system: implications for standardization and improved resource utilization

    PubMed Central

    Brauer, David G; Hawkins, William G; Strasberg, Steven M; Brunt, L Michael; Jaques, David P; Mercurio, Nicholas R; Hall, Bruce L; Fields, Ryan C

    2015-01-01

    Background Payers and regulatory bodies are increasingly placing emphasis on cost containment, quality/outcome measurement and transparent reporting. Significant cost variation occurs in many operative procedures without a clear relationship with outcomes. Clear cost-benefit associations will be necessary to justify expenditures in the era of bundled payment structures. Methods All laparoscopic cholecystectomies (LCCKs) performed within a single health system over a 1-year period were analysed for operating room (OR) supply cost. The cost was correlated with American College of Surgeons National Surgical Quality Improvement Program (ACS NSQIP) outcomes. Results From July 2013 to June 2014, 2178 LCCKs were performed by 55 surgeons at seven hospitals. The median case OR supply cost was $513 ± 156. There was variation in cost between individual surgeons and within an individual surgeon's practice. There was no correlation between cost and ACS NSQIP outcomes. The majority of cost variation was explained by selection of trocar and clip applier constructs. Conclusions Significant case OR cost variation is present in LCCK across a single health system, and there is no clear association between increased cost and NSQIP outcomes. Placed within the larger context of overall cost, the opportunity exists for improved resource utilization with no obvious risk for a reduction in the quality of care. PMID:26345351

  1. Optimisation robuste des aeronefs et des groupes turboreacteurs

    NASA Astrophysics Data System (ADS)

    Couturier, Philippe

    Future aircraft and powerplant designs will need to meet and perhaps anticipate increasingly demanding operational constraints. This progressive evolution in design requirements is already at work and arises from the combined impacts of increasingly stringent environmental norms with regards to noise and atmospheric emissions, a depletion of fossil fuel reserves which is expected to drive fuel costs upwards, as well as a steady increase in air traffic. In order to adapt to these market shifts, aircraft and powerplant companies will need to explore the potential range of benefits and risks associated with a wide spectrum of new designs and technologies. At the same time, it will be necessary to ensure that the resulting end products provide cost effective solutions when operated in the economic environment foreseen for the next generation of aircrafts. The objective of this study is to develop a methodology which enables the selection of optimal robust designs at the preliminary design stage as well as to quantify the compromise between a robust design and a potential gain in performance. The developed methodology is used in the design of a seventy passenger aircraft in order to determine the effects of uncertainty. The methodology seeks to optimize the design while attenuating its sensitivity to uncertainties. The goal is to reduce the likelihood of costly concept reformulations in the later stages of the product development process. A design platform was developed to enable the study at a conceptual level of aircraft and engine performance. It comprises four modules namely: the aircraft design and performance software Pacelab APD, a metamodel constructed with the software GasTurb to calculate engine performance, a module to predict the noise level, and a module to determine the operating costs. The last two modules were constructed using data from the literature. The effects related to two types of uncertainties present at the preliminary design stage were analyzed. These are uncertainties related to the market forecast for when the next generation of aircrafts will be in service as well as uncertainties of the level of fidelity of the models used. Based on predictions for future oil costs, the research found that an aircraft built for a similar cruising speed as today's jet aircrafts will minimize the mean of the predicted operating cost by having a configuration that minimizes fuel consumption. Conversely, it has been determined that fuel cost does not affect the design optimized to minimize the mean of the predicted operating costs when the cruise Mach number is variable. Furthermore, the use of Pareto fronts in order to quantify the compromise between a robust design and a potential gain in performance showed that the design variables have little influence on the sensitivity of the operating cost subject to model uncertainties. It has also been determined that neglecting uncertainties during the design process can lead to the selection of a configuration with a high risk of not satisfying the constraints.

  2. The unwritten price of cosmetic tourism: an observational study and cost analysis.

    PubMed

    Miyagi, K; Auberson, D; Patel, A J; Malata, C M

    2012-01-01

    Cosmetic tourism, driven by the promise of inexpensive operations abroad, is increasingly popular despite warnings from professional bodies regarding associated risks. Increasing numbers of individuals have presented to our department requesting NHS treatment of complications from such surgery. We set out to characterize these patients and evaluate costs incurred through their assessment and management. An observational study was conducted from 2007 to 2009 on patients presenting to a tertiary referral Plastic Surgery practice with complications of cosmetic tourism surgery. Demographic characteristics, as well as those related to the operation, were recorded. Hospital patient flow pathways were constructed, cost analysis performed using Patient Level Costing, and expenditure and profitability calculated. Nineteen patients presented within the study period. Most operations were performed in Europe or Asia, and were primarily breast augmentation procedures (n=13). The principal complications were wound infection or dehiscence, and poor cosmetic results. Eleven patients received NHS treatment, at a cost of £120,841. The mean cost for all patients' management was £6360 (range: £114-£57,968), rising to £10,878 for those accepted for treatment. For 8 of the 9 patients (89%) for whom full patient level costing was available, the hospital incurred a financial loss. The costs to the NHS of managing complications of cosmetic tourism are substantial, and underestimated by central funding agencies. Copyright © 2011 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  3. Premium cost optimization of operational and maintenance of green building in Indonesia using life cycle assessment method

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Budiman, Rachmat; Riswanto

    2017-06-01

    Building has a big impact on the environmental developments. There are three general motives in building, namely the economy, society, and environment. Total completed building construction in Indonesia increased by 116% during 2009 to 2011. It made the energy consumption increased by 11% within the last three years. In fact, 70% of energy consumption is used for electricity needs on commercial buildings which leads to an increase of greenhouse gas emissions by 25%. Green Building cycle costs is known as highly building upfront cost in Indonesia. The purpose of optimization in this research improves building performance with some of green concept alternatives. Research methodology is mixed method of qualitative and quantitative approaches through questionnaire surveys and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment Method. Choosing optimization results were based on the largest efficiency of building life cycle and the most effective cost to refund.

  4. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  5. Enhanced organics and nitrogen removal in batch-operated vertical flow constructed wetlands by combination of intermittent aeration and step feeding strategy.

    PubMed

    Fan, Jinlin; Liang, Shuang; Zhang, Bo; Zhang, Jian

    2013-04-01

    Oxygen and carbon source supply are usually insufficient in subsurface flow constructed wetlands. Simultaneous removal of organic pollutants and nitrogen in five batch-operated vertical flow constructed wetlands under different operating conditions was investigated. Alternate aerobic and anaerobic regions were created well with intermittent aeration. Four-month experiments showed that the wetland-applied intermittent aeration combined with step feeding strategy (reactor E) greatly improved the removal of organics, ammonium nitrogen (NH4-N), and total nitrogen (TN) simultaneously, which were 97, 96, and 82%, respectively. It was much better than non-aerated reactors A and B and outperformed intermittently aerated reactor D without step feeding. Continuous aeration (reactor C) significantly enhanced the organics removal and nitrification, but it limited the TN removal (29%) seriously as a result of low denitrification level, and the high operation cost remained a question. The effect of plants was confirmed in this study, and the monitoring data showed that the plants could grow normally. Intermittent aeration as well as step feeding had no obvious influence on the growth of wetland plants in this study.

  6. Comparison of Navy and Private-Sector Construction Costs

    DTIC Science & Technology

    1997-09-01

    contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar

  7. CAES (conventional compressed-air energy storage) plant with steam generation: Preliminary design and cost analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nakhamkin, M.; Swensen, E.C.; Abitante, P.A.

    1990-10-01

    A study was performed to evaluate the performance and cost characteristics of two alternative CAES-plant concepts which utilize the low-pressure expander's exhaust-gas heat for the generation of steam in a heat recovery steam generator (HRSG). Both concepts result in increased net-power generation relative to a conventional CAES plant with a recuperator. The HRSG-generated steam produces additional power in either a separate steam-turbine bottoming cycle (CAESCC) or by direct injection into and expansion through the CAES-turboexpander train (CAESSI). The HRSG, which is a proven component of combined-cycle and cogeneration plants, replaces the recuperator of a conventional CAES plant, which has demonstratedmore » the potential for engineering and operating related problems and higher costs than were originally estimated. To enhance the credibility of the results, the analyses performed were based on the performance, operational and cost data of the 110-MW CAES plant currently under construction for the Alabama Electric Cooperative (AEC). The results indicate that CAESCC- and CAESSI-plant concepts are attractive alternatives to the conventional CAES plant with recuperator, providing greater power generation, up to 44-MW relative to the AEC CAES plant, with competitive operating and capital costs. 5 refs., 43 figs., 26 tabs.« less

  8. The Role of Penal Quarantine in Reducing Violent Crime

    ERIC Educational Resources Information Center

    Johnson, Perry M.

    1978-01-01

    An examination of the limits of quarantine's potential effect under actual and ideal circumstances leads to the conclusion that current proposals for increasing the use of quarantine would reduce serious violent crime by no more than 10 percent at a staggering cost for prison construction and operation. Two alternative proposals are presented.…

  9. Optimization of Typological Requirements for Low-Cost Detached Houses

    NASA Astrophysics Data System (ADS)

    Kuráň, Jozef

    2017-09-01

    The presented paper deals with an analysis of the legislative, hygienic, functional and operational requirements for the design of detached houses and individual dwellings in terms of typological requirements. The article also presents a sociological survey about the preferences and subjective requirements of relevant public group segments in terms of living in a detached house or an individual dwelling. The aim of the paper is to define the possibilities for the optimization of typological requirements. The optimization methods are based on principles already applied to contemporary detached house preferences and trends. The main idea is to reduce the amount of floor space, thus lowering construction and operating costs. The goal is to design an optimized floor plan, while preserving the hygienic criteria for individual residential dwellings. By applying optimization methods, a so-called rationalized and conditioned floor plan results in an individual dwelling floor plan design that can be compared to a reference model with an accurate quantification comparison. The significant sources of research are the legislative and normative requirements in the field of house construction in Slovakia, the Czech Republic and abroad.

  10. Precision vector control of a superconducting RF cavity driven by an injection locked magnetron

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chase, Brian; Pasquinelli, Ralph; Cullerton, Ed

    The technique presented in this paper enables the regulation of both radio frequency amplitude and phase in narrow band devices such as a Superconducting RF (SRF) cavity driven by constant power output devices i.e. magnetrons [1]. The ability to use low cost high efficiency magnetrons for accelerator RF power systems, with tight vector regulation, presents a substantial cost savings in both construction and operating costs - compared to current RF power system technology. An operating CW system at 2.45 GHz has been experimentally developed. Vector control of an injection locked magnetron has been extensively tested and characterized with a SRFmore » cavity as the load. Amplitude dynamic range of 30 dB, amplitude stability of 0.3% r.m.s, and phase stability of 0.26 degrees r.m.s. has been demonstrated.« less

  11. Precision vector control of a superconducting RF cavity driven by an injection locked magnetron

    DOE PAGES

    Chase, Brian; Pasquinelli, Ralph; Cullerton, Ed; ...

    2015-03-01

    The technique presented in this paper enables the regulation of both radio frequency amplitude and phase in narrow band devices such as a Superconducting RF (SRF) cavity driven by constant power output devices i.e. magnetrons [1]. The ability to use low cost high efficiency magnetrons for accelerator RF power systems, with tight vector regulation, presents a substantial cost savings in both construction and operating costs - compared to current RF power system technology. An operating CW system at 2.45 GHz has been experimentally developed. Vector control of an injection locked magnetron has been extensively tested and characterized with a SRFmore » cavity as the load. Amplitude dynamic range of 30 dB, amplitude stability of 0.3% r.m.s, and phase stability of 0.26 degrees r.m.s. has been demonstrated.« less

  12. Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soli Khericha; Edwin Harvego; John Svoboda

    2012-01-01

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less

  13. A simulation system for Space Station extravehicular activity

    NASA Technical Reports Server (NTRS)

    Marmolejo, Jose A.; Shepherd, Chip

    1993-01-01

    America's next major step into space will be the construction of a permanently manned Space Station which is currently under development and scheduled for full operation in the mid-1990's. Most of the construction of the Space Station will be performed over several flights by suited crew members during an extravehicular activity (EVA) from the Space Shuttle. Once fully operational, EVA's will be performed from the Space Station on a routine basis to provide, among other services, maintenance and repair operations of satellites currently in Earth orbit. Both voice recognition and helmet-mounted display technologies can improve the productivity of workers in space by potentially reducing the time, risk, and cost involved in performing EVA. NASA has recognized this potential and is currently developing a voice-controlled information system for Space Station EVA. Two bench-model helmet-mounted displays and an EVA simulation program have been developed to demonstrate the functionality and practicality of the system.

  14. Restless Tuneup of High-Fidelity Qubit Gates

    NASA Astrophysics Data System (ADS)

    Rol, M. A.; Bultink, C. C.; O'Brien, T. E.; de Jong, S. R.; Theis, L. S.; Fu, X.; Luthi, F.; Vermeulen, R. F. L.; de Sterke, J. C.; Bruno, A.; Deurloo, D.; Schouten, R. N.; Wilhelm, F. K.; Dicarlo, L.

    We present a tuneup protocol for qubit gates with tenfold speedup over traditional methods reliant on qubit initialization by energy relax- ation. This speedup is achieved by constructing a cost function for Nelder-Mead optimization from real-time correlation of non-demolition measurements interleaving gate operations without pause. Applying the protocol on a transmon qubit achieves 0.999 average Clifford fidelity in one minute, as independently verified using randomized benchmarking and gate set tomography. The adjustable sensitivity of the cost function allows detecting fractional reductions in gate error with constant signal- to-noise ratio. The restless concept here demonstrated can be readily extended to the tuneup of two-qubit gates and measurement operations. Research funded by IARPA, an ERC Synergy Grant, Microsoft Research, and the China Scholarship Council.

  15. Processor architectures utilizing magnetic bubble and semi-conductor memories. [for the Omega navigation system

    NASA Technical Reports Server (NTRS)

    Parrish, E. A., Jr.; Aylor, J. H.

    1975-01-01

    To aid work being conducted on the feasibility of a low cost Omega navigational receiver, a control panel was designed and constructed according to supplied specifications. Since the proposed Omega receiver is designed around a microprocessor, software engineering necessary for control panel operation is included in the design. The control panel is to be used as an operational model for use in the design of a prototype receiver. A detailed description of the hardware design is presented along with a description of the software needed to operate the panel. A complete description of the operating procedures for the panel are also included.

  16. Low-Cost, High-Throughput Sequencing of DNA Assemblies Using a Highly Multiplexed Nextera Process.

    PubMed

    Shapland, Elaine B; Holmes, Victor; Reeves, Christopher D; Sorokin, Elena; Durot, Maxime; Platt, Darren; Allen, Christopher; Dean, Jed; Serber, Zach; Newman, Jack; Chandran, Sunil

    2015-07-17

    In recent years, next-generation sequencing (NGS) technology has greatly reduced the cost of sequencing whole genomes, whereas the cost of sequence verification of plasmids via Sanger sequencing has remained high. Consequently, industrial-scale strain engineers either limit the number of designs or take short cuts in quality control. Here, we show that over 4000 plasmids can be completely sequenced in one Illumina MiSeq run for less than $3 each (15× coverage), which is a 20-fold reduction over using Sanger sequencing (2× coverage). We reduced the volume of the Nextera tagmentation reaction by 100-fold and developed an automated workflow to prepare thousands of samples for sequencing. We also developed software to track the samples and associated sequence data and to rapidly identify correctly assembled constructs having the fewest defects. As DNA synthesis and assembly become a centralized commodity, this NGS quality control (QC) process will be essential to groups operating high-throughput pipelines for DNA construction.

  17. Public service impacts of geothermal development: cumulative impacts study of the Geysers KGRA. Final staff report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, K.M.

    1983-07-01

    The number of workers currently involved in the various aspects of geothermal development in the Geysers are identified. Using two different development scenarios, projections are made for the number of power plants needed to reach the electrical generation capacity of the steam resource in the Geysers. The report also projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power plants. Although the number of construction workers fluctuates, most are not likely to become new, permanent residents of the KGRA counties. The administrative and public service costs of geothermal development tomore » local jurisdications are examined, and these costs are compared to geothermal revenues accruing to the local governments. Revenues do not cover the immediate fiscal needs resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several mitigation options are discussed and a framework presented for calculating mitigation costs for school and road impacts.« less

  18. Space Habitat, assembly and repair facility

    NASA Technical Reports Server (NTRS)

    Colangelo, Todd A.; Hoetger, Debora C.; Kuo, Addison C.; Lo, Michael C.; Marcus, Leland R.; Tran, Phillip P.; Tutt, Chris J.; Wassmuth, Chad M.; Wildgrube, Gregory M.

    1992-01-01

    Integrated Space Systems (ISS) has designed a Low Earth Orbit Assembly Facility for submission in the 1992 AIAA/LORAL Team Space Design Competition. This facility, the Space Habitat, Assembly, and Repair Center (SHARC), will be used to construct, assemble, and service space vehicles. SHARC's primary mission will be the construction of interplanetary vehicles, but it will also be able to perform repair and refueling operations of craft which are in an Earth orbit. This facility has been designed using only present and near-present technology. The emphasis is on minimizing cost.

  19. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.

    PubMed

    Hu, Wenfa; He, Xinhua

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  20. 18 CFR 367.52 - Overhead construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  1. 18 CFR 367.52 - Overhead construction costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  2. Proton facility economics: the importance of "simple" treatments.

    PubMed

    Johnstone, Peter A S; Kerstiens, John; Richard, Helsper

    2012-08-01

    Given the cost and debt incurred to build a modern proton facility, impetus exists to minimize treatment of patients with complex setups because of their slower throughput. The aim of this study was to determine how many "simple" cases are necessary given different patient loads simply to recoup construction costs and debt service, without beginning to cover salaries, utilities, beam costs, and so on. Simple cases are ones that can be performed quickly because of an easy setup for the patient or because the patient is to receive treatment to just one or two fields. A "standard" construction cost and debt for 1, 3, and 4 gantry facilities were calculated from public documents of facilities built in the United States, with 100% of the construction funded through standard 15-year financing at 5% interest. Clinical best case (that each room was completely scheduled with patients over a 14-hour workday) was assumed, and a statistical analysis was modeled with debt, case mix, and payer mix moving independently. Treatment times and reimbursement data from the investigators' facility for varying complexities of patients were extrapolated for varying numbers treated daily. Revenue assumptions of $X per treatment were assumed both for pediatric cases (a mix of Medicaid and private payer) and state Medicare simple case rates. Private payer reimbursement averages $1.75X per treatment. The number of simple patients required daily to cover construction and debt service costs was then derived. A single gantry treating only complex or pediatric patients would need to apply 85% of its treatment slots simply to service debt. However, that same room could cover its debt treating 4 hours of simple patients, thus opening more slots for complex and pediatric patients. A 3-gantry facility treating only complex and pediatric cases would not have enough treatment slots to recoup construction and debt service costs at all. For a 4-gantry center, focusing on complex and pediatric cases alone, there would not be enough treatment slots to cover even 60% of debt service. Personnel and recurring costs and profit further reduce the business case for performing more complex patients. Debt is not variable with capacity. Absent philanthropy, financing a modern proton center requires treating a case load emphasizing simple patients even before operating costs and any profit are achieved. Copyright © 2012 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  3. Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3

    NASA Technical Reports Server (NTRS)

    Blocher, J. M., Jr.; Browning, M. F.

    1979-01-01

    The construction of the 50 MT Si/year experimental process system development unit was deferred until FY 1980, and the fluidized bed, zinc vaporizer, by-product condenser, and electrolytic cell were combined with auxiliary units, capable of supporting 8-hour batchwise operation, to form the process development unit (PDU), which is scheduled to be in operation by October 1, 1979. The design of the PDU and objectives of its operation are discussed. Experimental program support activities described relate to: (1) a wetted-wall condensor; (2) fluidized-bed modeling; (3) zinc chloride electrolysis; and (4) zinc vaporizer.

  4. Overview of escalator applications in rail transit

    NASA Technical Reports Server (NTRS)

    Deshpande, G.; Rubenstein, L.

    1980-01-01

    The difference in operating environment and in construction between escalators in transit and nontransit use, the impact of recent escalator innovations, and areas which could benefit from urban mass transportation administration sponsored research and development are determined. Several factors causing a more severe transit escalator operating environment are identified. There are no significant design differences between transit and nontransit escalators. Recent innovations that have affected performance and cost include outdoor escalators, extra flat steps at both landings, and modular escalators. Data were collected by interviews at transit agencies. Long term, unscheduled, escalator maintenance records were available for analysis from one property. A description of escalator operating principles is provided. Transit represents less than 5% of the U.S. escalator market. Transit agencies have limited leverage on escalator industry practices. A substantial impact on transit escalator cost and performance can be achieved by research identifying when and how to apply and specify several of the more recent innovations. Purchase of escalators under long term (25 year) maintenance contracts is one method that has been used to promote escalators manufactured for minimum life cycle cost.

  5. Silicon web process development

    NASA Technical Reports Server (NTRS)

    Duncan, C. S.; Seidensticker, R. G.; Mchugh, J. P.; Hill, F. E.; Skutch, M. E.; Driggers, J. M.; Hopkins, R. H.

    1980-01-01

    A barrier crucible design which consistently maintains melt stability over long periods of time was successfully tested and used in long growth runs. The pellet feeder for melt replenishment was operated continuously for growth runs of up to 17 hours. The liquid level sensor comprising a laser/sensor system was operated, performed well, and meets the requirements for maintaining liquid level height during growth and melt replenishment. An automated feedback loop connecting the feed mechanism and the liquid level sensing system was designed and constructed and operated successfully for 3.5 hours demonstrating the feasibility of semi-automated dendritic web growth. The sensitivity of the cost of sheet, to variations in capital equipment cost and recycling dendrites was calculated and it was shown that these factors have relatively little impact on sheet cost. Dendrites from web which had gone all the way through the solar cell fabrication process, when melted and grown into web, produce crystals which show no degradation in cell efficiency. Material quality remains high and cells made from web grown at the start, during, and the end of a run from a replenished melt show comparable efficiencies.

  6. Methodology for urban rail and construction technology research and development planning

    NASA Technical Reports Server (NTRS)

    Rubenstein, L. D.; Land, J. E.; Deshpande, G.; Dayman, B.; Warren, E. H.

    1980-01-01

    A series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.

  7. Optimization in fractional aircraft ownership

    NASA Astrophysics Data System (ADS)

    Septiani, R. D.; Pasaribu, H. M.; Soewono, E.; Fayalita, R. A.

    2012-05-01

    Fractional Aircraft Ownership is a new concept in flight ownership management system where each individual or corporation may own a fraction of an aircraft. In this system, the owners have privilege to schedule their flight according to their needs. Fractional management companies (FMC) manages all aspects of aircraft operations, including utilization of FMC's aircraft in combination of outsourced aircrafts. This gives the owners the right to enjoy the benefits of private aviations. However, FMC may have complicated business requirements that neither commercial airlines nor charter airlines faces. Here, optimization models are constructed to minimize the number of aircrafts in order to maximize the profit and to minimize the daily operating cost. In this paper, three kinds of demand scenarios are made to represent different flight operations from different types of fractional owners. The problems are formulated as an optimization of profit and a daily operational cost to find the optimum flight assignments satisfying the weekly and daily demand respectively from the owners. Numerical results are obtained by Genetic Algorithm method.

  8. A novel weight determination method for time series data aggregation

    NASA Astrophysics Data System (ADS)

    Xu, Paiheng; Zhang, Rong; Deng, Yong

    2017-09-01

    Aggregation in time series is of great importance in time series smoothing, predicting and other time series analysis process, which makes it crucial to address the weights in times series correctly and reasonably. In this paper, a novel method to obtain the weights in time series is proposed, in which we adopt induced ordered weighted aggregation (IOWA) operator and visibility graph averaging (VGA) operator and linearly combine the weights separately generated by the two operator. The IOWA operator is introduced to the weight determination of time series, through which the time decay factor is taken into consideration. The VGA operator is able to generate weights with respect to the degree distribution in the visibility graph constructed from the corresponding time series, which reflects the relative importance of vertices in time series. The proposed method is applied to two practical datasets to illustrate its merits. The aggregation of Construction Cost Index (CCI) demonstrates the ability of proposed method to smooth time series, while the aggregation of The Taiwan Stock Exchange Capitalization Weighted Stock Index (TAIEX) illustrate how proposed method maintain the variation tendency of original data.

  9. Occupational injury costs and alternative employment in construction trades.

    PubMed

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Men, Yurong; Haile, Elizabeth

    2007-11-01

    To present the costs of fatal and non-fatal days-away-from-work injuries in 50 construction occupations. Our results also provide indirect evidence on the cost exposure of alternative construction workers such as independent contractors, on-call or day labor, contract workers, and temporary workers. We combine data from the Bureau of Labor Statistics on average annual incidence from 2000 to 2002 with updated per-case costs from an existing cost model for occupational injuries. The Current Population Survey provides data on the percentage of alternative construction workers. Construction laborers and carpenters were the two costliest occupations, with 40% of the industry's injury costs. The 10 costliest construction occupations also have a high percentage of alternative workers. The construction industry has both a high rate of alternative employment and high costs of work injury. Alternative workers, often lacking workers' compensation, are especially exposed to injury costs.

  10. Low Cost Silicon Solar Array Project. Feasibility of Low-cost, High-volume Production of Silane and Pyrolysis of Silane to Semiconductor-grade Silicon

    NASA Technical Reports Server (NTRS)

    Breneman, W. C.; Farrier, E. G.; Morihara, H.

    1978-01-01

    The presence of copper promotes a more rapid approach to the steady stete operating condition and results in a more consistent reactor effluent composition. The average kinetic and equilibrium yield are unchanged. Incoloy has been identified as the preferred choice of material of construction for the hydrogenation reactor although certain metallurgical changes were noted in samples exposed to the H2/HCl atmosphere at 500 C which indicate the need for more testing.

  11. A cost-effective, accurate machine for testing the torsional strength of sheep long bones.

    PubMed

    Jämsä, T; Jalovaara, P

    1996-07-01

    A cost-effective torsional testing machine for sheep long bones was constructed. The machine was fabricated on a disused standard turning lathe. The angular speed used was 6.5 degrees/s. A precision amplifier using modern low-noise, low-drift operational amplifiers was developed. The maximum torsional load was 250 Nm, the sensitivity 0.5 Nm and the total machine inaccuracy less than 1.0%. The standard error of torsional testing was 3.0% when seven pairs of intact sheep tibiae were tested.

  12. Integrated electrofluidic circuits: pressure sensing with analog and digital operation functionalities for microfluidics.

    PubMed

    Wu, Chueh-Yu; Lu, Jau-Ching; Liu, Man-Chi; Tung, Yi-Chung

    2012-10-21

    Microfluidic technology plays an essential role in various lab on a chip devices due to its desired advantages. An automated microfluidic system integrated with actuators and sensors can further achieve better controllability. A number of microfluidic actuation schemes have been well developed. In contrast, most of the existing sensing methods still heavily rely on optical observations and external transducers, which have drawbacks including: costly instrumentation, professional operation, tedious interfacing, and difficulties of scaling up and further signal processing. This paper reports the concept of electrofluidic circuits - electrical circuits which are constructed using ionic liquid (IL)-filled fluidic channels. The developed electrofluidic circuits can be fabricated using a well-developed multi-layer soft lithography (MSL) process with polydimethylsiloxane (PDMS) microfluidic channels. Electrofluidic circuits allow seamless integration of pressure sensors with analog and digital operation functions into microfluidic systems and provide electrical readouts for further signal processing. In the experiments, the analog operation device is constructed based on electrofluidic Wheatstone bridge circuits with electrical outputs of the addition and subtraction results of the applied pressures. The digital operation (AND, OR, and XOR) devices are constructed using the electrofluidic pressure controlled switches, and output electrical signals of digital operations of the applied pressures. The experimental results demonstrate the designed functions for analog and digital operations of applied pressures are successfully achieved using the developed electrofluidic circuits, making them promising to develop integrated microfluidic systems with capabilities of precise pressure monitoring and further feedback control for advanced lab on a chip applications.

  13. Desalination: Status and Federal Issues

    DTIC Science & Technology

    2009-12-30

    on one side and lets purified water through. Reverse osmosis plants have fewer problems with corrosion and usually have lower energy requirements...Texas) and cities are actively researching and investigating the feasibility of large-scale desalination plants for municipal water supplies...desalination research and development, and in construction and operational costs of desalination demonstration projects and full-scale plants

  14. 49 CFR 262.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...

  15. 49 CFR 262.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...

  16. 49 CFR 262.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...

  17. Economic benefits of improved meteorological forecasts - The construction industry

    NASA Technical Reports Server (NTRS)

    Bhattacharyya, R. K.; Greenberg, J. S.

    1976-01-01

    Estimates are made of the potential economic benefits accruing to particular industries from timely utilization of satellite-derived six-hour weather forecasts, and of economic penalties resulting from failure to utilize such forecasts in day-to-day planning. The cost estimate study is centered on the U.S. construction industry, with results simplified to yes/no 6-hr forecasts on thunderstorm activity and work/no work decisions. Effects of weather elements (thunderstorms, snow and sleet) on various construction operations are indicated. Potential dollar benefits for other industries, including air transportation and other forms of transportation, are diagrammed for comparison. Geosynchronous satellites such as STORMSAT, SEOS, and SMS/GOES are considered as sources of the forecast data.

  18. Assembly planning based on subassembly extraction

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan; Shin, Yeong Gil

    1990-01-01

    A method is presented for the automatic determination of assembly partial orders from a liaison graph representation of an assembly through the extraction of preferred subassemblies. In particular, the authors show how to select a set of tentative subassemblies by decomposing a liaison graph into a set of subgraphs based on feasibility and difficulty of disassembly, how to evaluate each of the tentative subassemblies in terms of assembly cost using the subassembly selection indices, and how to construct a hierarchical partial order graph (HPOG) as an assembly plan. The method provides an approach to assembly planning by identifying spatial parallelism in assembly as a means of constructing temporal relationships among assembly operations and solves the problem of finding a cost-effective assembly plan in a flexible environment. A case study of the assembly planning of a mechanical assembly is presented.

  19. Construction Cost Growth for New Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubic, Jr., William L.

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less

  20. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    PubMed Central

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351

  1. Case Study for the ARRA-funded Ground Source Heat Pump Demonstration at Denver Museum of Nature & Science

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Im, Piljae; Liu, Xiaobing

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. Themore » RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.« less

  2. Processing Technology Selection for Municipal Sewage Treatment Based on a Multi-Objective Decision Model under Uncertainty.

    PubMed

    Chen, Xudong; Xu, Zhongwen; Yao, Liming; Ma, Ning

    2018-03-05

    This study considers the two factors of environmental protection and economic benefits to address municipal sewage treatment. Based on considerations regarding the sewage treatment plant construction site, processing technology, capital investment, operation costs, water pollutant emissions, water quality and other indicators, we establish a general multi-objective decision model for optimizing municipal sewage treatment plant construction. Using the construction of a sewage treatment plant in a suburb of Chengdu as an example, this paper tests the general model of multi-objective decision-making for the sewage treatment plant construction by implementing a genetic algorithm. The results show the applicability and effectiveness of the multi-objective decision model for the sewage treatment plant. This paper provides decision and technical support for the optimization of municipal sewage treatment.

  3. Evidence-Based and Value-Based Decision Making About Healthcare Design: An Economic Evaluation of the Safety and Quality Outcomes.

    PubMed

    Zadeh, Rana; Sadatsafavi, Hessam; Xue, Ryan

    2015-01-01

    This study describes a vision and framework that can facilitate the implementation of evidence-based design (EBD), scientific knowledge base into the process of the design, construction, and operation of healthcare facilities and clarify the related safety and quality outcomes for the stakeholders. The proposed framework pairs EBD with value-driven decision making and aims to improve communication among stakeholders by providing a common analytical language. Recent EBD research indicates that the design and operation of healthcare facilities contribute to an organization's operational success by improving safety, quality, and efficiency. However, because little information is available about the financial returns of evidence-based investments, such investments are readily eliminated during the capital-investment decision-making process. To model the proposed framework, we used engineering economy tools to evaluate the return on investments in six successful cases, identified by a literature review, in which facility design and operation interventions resulted in reductions in hospital-acquired infections, patient falls, staff injuries, and patient anxiety. In the evidence-based cases, calculated net present values, internal rates of return, and payback periods indicated that the long-term benefits of interventions substantially outweighed the intervention costs. This article explained a framework to develop a research-based and value-based communication language on specific interventions along the planning, design and construction, operation, and evaluation stages. Evidence-based and value-based design frameworks can be applied to communicate the life-cycle costs and savings of EBD interventions to stakeholders, thereby contributing to more informed decision makings and the optimization of healthcare infrastructures. © The Author(s) 2015.

  4. The construction and operation of a low-cost poultry waste digester.

    PubMed

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  5. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davlin, Thomas

    The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot printmore » and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.« less

  7. VML 3.0 Reactive Sequencing Objects and Matrix Math Operations for Attitude Profiling

    NASA Technical Reports Server (NTRS)

    Grasso, Christopher A.; Riedel, Joseph E.

    2012-01-01

    VML (Virtual Machine Language) has been used as the sequencing flight software on over a dozen JPL deep-space missions, most recently flying on GRAIL and JUNO. In conjunction with the NASA SBIR entitled "Reactive Rendezvous and Docking Sequencer", VML version 3.0 has been enhanced to include object-oriented element organization, built-in queuing operations, and sophisticated matrix / vector operations. These improvements allow VML scripts to easily perform much of the work that formerly would have required a great deal of expensive flight software development to realize. Autonomous turning and tracking makes considerable use of new VML features. Profiles generated by flight software are managed using object-oriented VML data constructs executed in discrete time by the VML flight software. VML vector and matrix operations provide the ability to calculate and supply quaternions to the attitude controller flight software which produces torque requests. Using VML-based attitude planning components eliminates flight software development effort, and reduces corresponding costs. In addition, the direct management of the quaternions allows turning and tracking to be tied in with sophisticated high-level VML state machines. These state machines provide autonomous management of spacecraft operations during critical tasks like a hypothetic Mars sample return rendezvous and docking. State machines created for autonomous science observations can also use this sort of attitude planning system, allowing heightened autonomy levels to reduce operations costs. VML state machines cannot be considered merely sequences - they are reactive logic constructs capable of autonomous decision making within a well-defined domain. The state machine approach enabled by VML 3.0 is progressing toward flight capability with a wide array of applicable mission activities.

  8. A cost-effective approach to establishing a surgical skills laboratory.

    PubMed

    Berg, David A; Milner, Richard E; Fisher, Carol A; Goldberg, Amy J; Dempsey, Daniel T; Grewal, Harsh

    2007-11-01

    Recent studies comparing inexpensive low-fidelity box trainers to expensive computer-based virtual reality systems demonstrate similar acquisition of surgical skills and transferability to the clinical setting. With new mandates emerging that all surgical residency programs have access to a surgical skills laboratory, we describe our cost-effective approach to teaching basic and advanced open and laparoscopic skills utilizing inexpensive bench models, box trainers, and animate models. Open models (basic skills, bowel anastomosis, vascular anastomosis, trauma skills) and laparoscopic models (basic skills, cholecystectomy, Nissen fundoplication, suturing and knot tying, advanced in vivo skills) are constructed using a combination of materials found in our surgical research laboratories, retail stores, or donated by industry. Expired surgical materials are obtained from our hospital operating room and animal organs from food-processing plants. In vivo models are performed in an approved research facility. Operation, maintenance, and administration of the surgical skills laboratory are coordinated by a salaried manager, and instruction is the responsibility of all surgical faculty from our institution. Overall, the cost analyses of our initial startup costs and operational expenditures over a 3-year period revealed a progressive decrease in yearly cost per resident (2002-2003, $1,151; 2003-2004, $1,049; and 2004-2005, $982). Our approach to surgical skills education can serve as a template for any surgery program with limited financial resources.

  9. [Development of performance evaluation and management system on advanced schistosomiasis medical treatment].

    PubMed

    Zhou, Xiao-Rong; Huang, Shui-Sheng; Gong, Xin-Guo; Cen, Li-Ping; Zhang, Cong; Zhu, Hong; Yang, Jun-Jing; Chen, Li

    2012-04-01

    To construct a performance evaluation and management system on advanced schistosomiasis medical treatment, and analyze and evaluate the work of the advanced schistosomiasis medical treatment over the years. By applying the database management technique and C++ programming technique, we inputted the information of the advanced schistosomiasis cases into the system, and comprehensively evaluated the work of the advanced schistosomiasis medical treatment through the cost-effect analysis, cost-effectiveness analysis, and cost-benefit analysis. We made a set of software formula about cost-effect analysis, cost-effectiveness analysis, and cost-benefit analysis. This system had many features such as clear building, easy to operate, friendly surface, convenient information input and information search. It could benefit the performance evaluation of the province's advanced schistosomiasis medical treatment work. This system can satisfy the current needs of advanced schistosomiasis medical treatment work and can be easy to be widely used.

  10. Improving building performance using smart building concept: Benefit cost ratio comparison

    NASA Astrophysics Data System (ADS)

    Berawi, Mohammed Ali; Miraj, Perdana; Sayuti, Mustika Sari; Berawi, Abdur Rohim Boy

    2017-11-01

    Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.

  11. Development of Economic Factors in Tunnel Construction

    DOT National Transportation Integrated Search

    1977-12-01

    The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...

  12. Influence of Building Material Solution of Structures to Effectiveness of Real Estate Development

    NASA Astrophysics Data System (ADS)

    Somorová, Viera

    2015-11-01

    Real estate development is in its essence the development process characterized by a considerable dynamics. The purpose of the development process is the creation of buildings which can be either rented by future unknown users or sold in the real estate market. A first part of the paper is dedicated to the analysis of the parameters of buildings solutions considering the future operating costs in a phase of designing. Material solution of external structures is a main factor not only in determining the future operating costs but also in achieving the subsequent economic effectiveness of the real estate development. To determine the relationship between economic efficiency criteria and determine the optimal material variant of building constructions for the specific example is the aim of the second part of paper.

  13. Design of the Grimethorpe Experimental Facility as of March 1981: a technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-06-01

    The Experimental Pressurized Fluidized Bed Combustor, which has been built as an extension to the National Coal Board Power Station, which is adjacent to Grimethorpe Colliery, Yorkshire, England, is described in this report. The Governments of the United Kingdom, the United States of America and the Federal Republic of Germany, under the auspices of the International Energy Agency, have agreed to share equally between them the costs of building and operating the plant. Control of the project was vested in an Executive Committee consisting of one representative of each Government with all decisions requiring unanimity. The actual operation of themore » project was vested in an Operating Agent, NCB (IEA Services) Ltd., a wholly owned subsidiary of the National Coal Board. The Implementing Agreement envisages a seven year project to be executed in four stages: (1) Procurement of Design Study with accompanying tender documents. (2) Tendering for construction of the Plant; study of appraisal of tenders. (3) Construction and acceptance of the Plant. (4) Operation of the Plant. The project is now towards the end of Stage 3. Construction has been completed and commissioning is in progress to prepare the plant for the start of the operational phase in Autumn 1981. Because of the confidentiality of much of the design information, for the purposes of this report technical descriptions have been confined to that of a general appraisal.« less

  14. Waste Handeling Building Conceptual Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less

  15. Design and operation of small biogas plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abdel-Dayem, A.M.; Hamad, M.A.

    1980-12-01

    This paper concentrates on the experience gained from the adaptation of the Chinese biogas technology to rural areas of Egypt. Three different prototype digesters have been constructed. The first is a 10 M/sup 3/ rectangular digester of the water pressure type, the second is a 6 M/sup 3/ circular and shallow digester with domed roof and dished bottom. The third prototype unit with a capacity of 7 M/sup 3/ has been recently constructed. It combines the features of both plug flow and the Indian movable cap types. Provisions for solar heating of feed water, composting of effluent and attachments tomore » both latrine and animal shed were incorporated in the unit. The structural theory, design criteria, construction technique and cost estimation of the circular digester are described. Some operation and performance data of the circular digester are presented. This covers the effects of variation of ambient temperature on internal temperature, effects of temperature and pressure on the gas production rate and composition.« less

  16. Understanding cost growth during operations of planetary missions: An explanation of changes

    NASA Astrophysics Data System (ADS)

    McNeill, J. F.; Chapman, E. L.; Sklar, M. E.

    In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed picture is constructed of why cost grew during the operations phase, even to the level of specific events in the life of the missions. As a next step, the Phase E EoC results were gleaned and synthesized to produce leading indicators, i.e., what may be identifiable signs of cost and staffing growth that may be present as early as PDR or CDR. Both a qualitative and quantitative approach was used to determine leading indicators. These leading indicators will be reviewed and a practical method for their use will be discussed.

  17. Costs of occupational injuries in construction in the United States.

    PubMed

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  18. Reduction of enteric infectious disease in rural China by providing deep-well tap water.

    PubMed Central

    Wang, Z. S.; Shepard, D. S.; Zhu, Y. C.; Cash, R. A.; Zhao, R. J.; Zhu, Z. X.; Shen, F. M.

    1989-01-01

    Enteric infectious disease (EID), defined here as bacillary dysentery, viral hepatitis A, El Tor cholera, or acute watery diarrhoea, is an important public health problem in most developing countries. This study assessed the impact on EID of providing deep-well tap water (DWTW) through household taps in rural China. For this purpose, we compared the incidence of EID in six study villages (population, 10,290) in Qidong County that had DWTW with that in six control villages (population 9397) that had only surface water. Both the bacterial counts and chemical properties of the DWTW met established hygiene standards for drinking water. The incidence of EID in the study region was 38.6% lower than in the control region; however, the introduction of DWTW supplies did not significantly affect the incidence of bacillary dysentery. These results indicate that the construction and use of DWTW systems with household taps is associated with decreased incidences of El Tor cholera, viral hepatitis A, and acute watery diarrhoea. Since high construction costs have led many authorities to question the value of DWTW, we carried out a cost-benefit analysis of the programme. The cost of constructing a DWTW system averaged US $36,000 at 1983 prices, or US $10.50 per capita. The combined capital and operating costs of a DWTW system were US $1.46 per capita per annum over its 20-year estimated life. The benefits derived from reductions in cost of illness and savings in time to fetch water were 2.2 times the costs at present values Capital outlays were recouped in a 3.6-year payback period and the provision of DWTW proved highly beneficial in both economic and social terms. PMID:2501042

  19. Directions for lunar construction - A derivation of requirements from a construction scenario analysis

    NASA Technical Reports Server (NTRS)

    Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.

    1992-01-01

    This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

  20. Thinking Like a Whole Building: Whole Foods Market New Construction Summary, U.S. Department of Energy's Commercial Building Partnerships (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-04-01

    Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identifiedmore » a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.« less

  1. Thinking Like a Whole Building: A Whole Foods Market New Construction Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deru, M.; Bonnema, E.; Doebber, I.

    2011-04-01

    Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identifiedmore » a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  3. Life cycle cost modeling of conceptual space vehicles

    NASA Technical Reports Server (NTRS)

    Ebeling, Charles

    1993-01-01

    This paper documents progress to date by the University of Dayton on the development of a life cycle cost model for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of a life cycle cost model. Cost categories are initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. The focus will be on operations and maintenance costs and other recurring costs. Secondary tasks performed concurrent with the development of the life cycle costing model include continual support and upgrade of the R&M model. The primary result of the completed research will be a methodology and a computer implementation of the methodology to provide for timely cost analysis in support of the conceptual design activities. The major objectives of this research are: to obtain and to develop improved methods for estimating manpower, spares, software and hardware costs, facilities costs, and other cost categories as identified by NASA personnel; to construct a life cycle cost model of a space transportation system for budget exercises and performance-cost trade-off analysis during the conceptual and development stages; to continue to support modifications and enhancements to the R&M model; and to continue to assist in the development of a simulation model to provide an integrated view of the operations and support of the proposed system.

  4. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  5. An Assessment of Water Demand and Availability to meet Construction and Operational Needs for Large Utility-Scale Solar Projects in the Southwestern United States

    NASA Astrophysics Data System (ADS)

    Klise, G. T.; Tidwell, V. C.; Macknick, J.; Reno, M. D.; Moreland, B. D.; Zemlick, K. M.

    2013-12-01

    In the Southwestern United States, there are many large utility-scale solar photovoltaic (PV) and concentrating solar power (CSP) facilities currently in operation, with even more under construction and planned for future development. These are locations with high solar insolation and access to large metropolitan areas and existing grid infrastructure. The Bureau of Land Management, under a reasonably foreseeable development scenario, projects a total of almost 32 GW of installed utility-scale solar project capacity in the Southwest by 2030. To determine the potential impacts to water resources and the potential limitations water resources may have on development, we utilized methods outlined by the Bureau of Land Management (BLM) to determine potential water use in designated solar energy zones (SEZs) for construction and operations & maintenance (O&M), which is then evaluated according to water availability in six Southwestern states. Our results indicate that PV facilities overall use less water, however water for construction is high compared to lifetime operational water needs. There is a transition underway from wet cooled to dry cooled CSP facilities and larger PV facilities due to water use concerns, though some water is still necessary for construction, operations, and maintenance. Overall, ten watersheds, 9 in California, and one in New Mexico were identified as being of particular concern because of limited water availability. Understanding the location of potentially available water sources can help the solar industry determine locations that minimize impacts to existing water resources, and help understand potential costs when utilizing non-potable water sources or purchasing existing appropriated water. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  6. Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White III, Chelsea C.; Petrovic, Bojan

    Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less

  7. Monitoring sediment production from forest road approaches to stream crossing in the Virginia Piedmont

    Treesearch

    Kristopher R. Brown; W. Michael Aust; Kevin J. McGuire

    2015-01-01

    Reopening of abandoned legacy roads is common in forest operations and represents a reduced cost in comparison to new road construction. However, legacy roads may have lower road standards and require additional best management practice (BMP) implementation upon reopening to protect water quality. Silt fences and elevation measurements of trapped sediment were used to...

  8. Prevailing Wage Rates: The Effects on School Construction Costs, Levels of Taxation, and State Reimbursements.

    ERIC Educational Resources Information Center

    Keller, Edward C.; Hartman, William T.

    2001-01-01

    Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…

  9. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project ismore » expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality, traffic, noise, and ecological resources, that could result from construction and operation of the proposed project. Key findings include that maximum modeled increases in ground-level concentrations of SO{sub 2} nitrogen dioxide (NO{sub 2}), and particulate matter (for the proposed project alone or in conjunction with the related action) would always be less than 10% of their corresponding standards for increases in pollutants. For potential cumulative air quality impacts, results of modeling regional sources and the proposed project indicate that the maximum 24-hour average SO{sub 2} concentration would closely approach (i.e., 97%) but not exceed the corresponding Florida standard. After the Unit 1 repowering, results indicate that the maximum 24-hour average SO{sub 2} concentration would be 91% of the Florida standard. Concentrations for other averaging periods and pollutants would be lower percentages of their standards. Regarding toxic air pollutants from the proposed project, the maximum annual cancer risk to a member of the public would be approximately 1 in 1 million; given the conservative assumptions in the estimate, the risk would probably be less. With regard to threatened and endangered species, impacts to manatees, gopher tortoises, and other species would be negligible or non-existent. Construction-induced traffic would result in noticeable congestion. In the unlikely event that all coal were transported by rail, up to 3 additional trains per week would exacerbate impacts associated with noise, vibration, and blocked roads at on-grade rail crossings. Additional train traffic could be minimized by relying more heavily on barges and ships for coal transport, which is likely to be a more economic fuel delivery mode. During construction of the proposed project, noise levels would increase from the current operational levels. Except possibly during steam blowouts and possibly during operation of equipment used to construct a nearby segment of a conveyor, construction noise should not appreciably affect the background noise of nearby residences or exceed local noise limitations. The preferred alternative for management of the combustion ash would be to sell it as a by-product to offsite customers. If more than approximately 70% of the ash could be sold over the 30-year lifetime of Northside Generating Station, the 40-acre storage site would be sufficient for complete containment.« less

  10. Using Sustainable Development as a Competitive Strategy

    NASA Astrophysics Data System (ADS)

    Spearman, Pat

    Sustainable development reduces construction waste by 43%, generating 50% cost savings. Residential construction executives lacking adequate knowledge regarding the benefits of sustainable development practices are at a competitive disadvantage. Drawing from the diffusion of innovation theory, the purpose of this qualitative case study was to explore knowledge acquisition within the bounds of sustainable residential construction. The purposive sample size of 11 executive decision makers fulfilled the sample size requirements and enabled the extraction of meaningful data. Participants were members of the National Home Builders Association and had experience of a minimum of 5 years in residential construction. The research question addressed how to improve knowledge acquisition relating to the cost benefits of building green homes and increase the adoption rate of sustainable development among residential builders. Data were collected via semistructured telephone interviews, field observation, and document analysis. Transcribed data were validated via respondent validation, coded into 5 initial categories aligned to the focus of the research, then reduced to 3 interlocking themes of environment, competitive advantage, and marketing. Recommendations include developing comprehensive public policies, horizontal and vertical communications networks, and green banks to capitalize sustainable development programs to improve the diffusion of green innovation as a competitive advantage strategy. Business leaders could benefit from this data by integrating sustainable development practices into their business processes. Sustainable development reduces operational costs, increases competitive advantage for builders, and reduces greenhouse gas emissions. Implications for social change increase energy independence through conservation and developing a legislative policy template for comprehensive energy strategies. A comprehensive energy strategy promotes economic development, technological gains in all business sectors within the energy industry, and reduces energy costs for consumers.

  11. A 20-liter test stand with gas purification for liquid argon research

    DOE PAGES

    Li, Y.; Thorn, C.; Tang, W.; ...

    2016-06-06

    Here, we describe the design of a 20-liter test stand constructed to study fundamental properties of liquid argon (LAr). Moreover, this system utilizes a simple, cost-effective gas argon (GAr) purification to achieve high purity, which is necessary to study electron transport properties in LAr. An electron drift stack with up to 25 cm length is constructed to study electron drift, diffusion, and attachment at various electric fields. Finally, a gold photocathode and a pulsed laser are used as a bright electron source. The operational performance of this system is reported.

  12. A 20-liter test stand with gas purification for liquid argon research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Y.; Thorn, C.; Tang, W.

    Here, we describe the design of a 20-liter test stand constructed to study fundamental properties of liquid argon (LAr). Moreover, this system utilizes a simple, cost-effective gas argon (GAr) purification to achieve high purity, which is necessary to study electron transport properties in LAr. An electron drift stack with up to 25 cm length is constructed to study electron drift, diffusion, and attachment at various electric fields. Finally, a gold photocathode and a pulsed laser are used as a bright electron source. The operational performance of this system is reported.

  13. Modular solar food dryers for farm use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.J. Jr.; Coleman, R.L.; Berry, R.E.

    1981-01-01

    Several solar food dryer modules have been constructed. Their design has been based on a low-cost, small-scale solar dryer using a unique parabolic reflector construction to increase radiation on the drying surface. Each module has a drying surface of 1.1 M/sup 2/ and a parabolic reflector area of 3.3 M/sup 2/. Some modules are being used to dry mango slices (a potential new food product) for market testing, while others are used for experiments to improve drying efficiency. A description is given of the operating conditions of the modules drying mango slices and the most effective modifications.

  14. Final Environmental Impact Statement. Mankato-North Mankato-Le Hillier Flood Control. Phase I (As Amended 18 January 1972). Final Supplement II-C.

    DTIC Science & Technology

    1983-11-01

    I A 11 Cultural Resources I 11 Noise CC7A&I 1.. Water Resources T, B 12 Traffic Service and Safety _._ 12 Rail Operations and Service 1 13 Avall e.no...Recreation 114 Cultural Resources 15 Noise 15 Water Resources 15 Traffic Service and Safety 16 Rail Operations and Service 16 6.00 Public Involvement 17...renovate the trusses, the disturbance to rail service that would occur during construction, and the small potential cost saving compared to the risks

  15. Cost analysis in the toxicology laboratory.

    PubMed

    Travers, E M

    1990-09-01

    The process of determining laboratory sectional and departmental costs and test costs for instrument-generated and manually generated reportable results for toxicology laboratories has been outlined in this article. It is hoped that the basic principles outlined in the preceding text will clarify and elucidate one of the most important areas needed for laboratory fiscal integrity and its survival in these difficult times for health care providers. The following general principles derived from this article are helpful aids for managers of toxicology laboratories. 1. To manage a cost-effective, efficient toxicology laboratory, several factors must be considered: the laboratory's instrument configuration, test turnaround time needs, the test menu offered, the analytic methods used, the cost of labor based on time expended and the experience and educational level of the staff, and logistics that determine specimen delivery time and costs. 2. There is a wide variation in costs for toxicologic methods, which requires that an analysis of capital (equipment) purchase and operational (test performance) costs be performed to avoid waste, purchase wisely, and determine which tests consume the majority of the laboratory's resources. 3. Toxicologic analysis is composed of many complex steps. Each step must be individually cost-accounted. Screening test results must be confirmed, and the cost for both steps must be included in the cost per reportable result. 4. Total costs will vary in the same laboratory and between laboratories based on differences in salaries paid to technical staff, differences in reagent/supply costs, the number of technical staff needed to operate the analyzer or perform the method, and the inefficient use of highly paid staff to operate the analyzer or perform the method. 5. Since direct test costs vary directly with the type and number of analyzers or methods and are dependent on the operational mode designed by the manufacturer, laboratory managers should construct an actual test-cost data base for instrument or method in use to accurately compare costs using the "bottom-up" approach. 6. Laboratory expenses can be examined from three perspectives: total laboratory, laboratory section, and subsection workstation. The objective is to track all laboratory expenses through each of these levels. 7. In the final analysis, a portion of total laboratory expenses must be allocated to each unit of laboratory output--the billable procedure or, in laboratories where tests are not billed, the tests produced.(ABSTRACT TRUNCATED AT 400 WORDS)

  16. Theoretical lower bounds for parallel pipelined shift-and-add constant multiplications with n-input arithmetic operators

    NASA Astrophysics Data System (ADS)

    Cruz Jiménez, Miriam Guadalupe; Meyer Baese, Uwe; Jovanovic Dolecek, Gordana

    2017-12-01

    New theoretical lower bounds for the number of operators needed in fixed-point constant multiplication blocks are presented. The multipliers are constructed with the shift-and-add approach, where every arithmetic operation is pipelined, and with the generalization that n-input pipelined additions/subtractions are allowed, along with pure pipelining registers. These lower bounds, tighter than the state-of-the-art theoretical limits, are particularly useful in early design stages for a quick assessment in the hardware utilization of low-cost constant multiplication blocks implemented in the newest families of field programmable gate array (FPGA) integrated circuits.

  17. The Feasibility of a Land Ferry System to Reduce Highway Maintenance Cost and Associated Externalities.

    PubMed

    Merrill, Steve J; Paz, Alexander; Molano, Victor; Shrestha, Pramen P; Maheshwari, Pankaj; Stephen, Haroon; de la Fuente-Mella, Hanns

    2016-01-01

    This study provides an economic evaluation for a Land Ferry, which is a rail system capable of carrying trucks and all other types of vehicles, passengers, and cargo. The Land Ferry system involves a sliding loading system to roll heavy loads onto a flatbed; as a result, loading and unloading of all vehicles and cargo could be accomplished simultaneously. The evaluation for this system included (1) the design of a new track alignment over which the Land Ferry system would run, (2) evaluation of various sources of power, (3) estimation of how many local jobs the Land Ferry would generate, and (4) a benefit-cost analysis. It was estimated that the Land Ferry would create over 45,788 temporary jobs in Nevada during the three-year construction period and 318 permanent jobs during operation. The majority of the benefits were attributed to savings in travel time ($356.4 M), vehicle operating costs ($1000.4 M), reduction of accidents ($544.6 M), and pavement maintenance ($503.2 M). These benefits would be a consequence of the shift of trucks from the highway, thus resulting in higher speeds, decrease fuel consumption, and decrease vehicle maintenance costs. The overall benefit-cost ratio of 1.7 implies a cost-effective project.

  18. Model documentation renewable fuels module of the National Energy Modeling System

    NASA Astrophysics Data System (ADS)

    1995-06-01

    This report documents the objectives, analytical approach, and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it relates to the production of the 1995 Annual Energy Outlook (AEO95) forecasts. The report catalogs and describes modeling assumptions, computational methodologies, data inputs, and parameter estimation techniques. A number of offline analyses used in lieu of RFM modeling components are also described. The RFM consists of six analytical submodules that represent each of the major renewable energy resources -- wood, municipal solid waste (MSW), solar energy, wind energy, geothermal energy, and alcohol fuels. The RFM also reads in hydroelectric facility capacities and capacity factors from a data file for use by the NEMS Electricity Market Module (EMM). The purpose of the RFM is to define the technological, cost, and resource size characteristics of renewable energy technologies. These characteristics are used to compute a levelized cost to be competed against other similarly derived costs from other energy sources and technologies. The competition of these energy sources over the NEMS time horizon determines the market penetration of these renewable energy technologies. The characteristics include available energy capacity, capital costs, fixed operating costs, variable operating costs, capacity factor, heat rate, construction lead time, and fuel product price.

  19. The Feasibility of a Land Ferry System to Reduce Highway Maintenance Cost and Associated Externalities

    PubMed Central

    Merrill, Steve J.; Paz, Alexander; Molano, Victor; Shrestha, Pramen P.; Maheshwari, Pankaj; Stephen, Haroon

    2016-01-01

    This study provides an economic evaluation for a Land Ferry, which is a rail system capable of carrying trucks and all other types of vehicles, passengers, and cargo. The Land Ferry system involves a sliding loading system to roll heavy loads onto a flatbed; as a result, loading and unloading of all vehicles and cargo could be accomplished simultaneously. The evaluation for this system included (1) the design of a new track alignment over which the Land Ferry system would run, (2) evaluation of various sources of power, (3) estimation of how many local jobs the Land Ferry would generate, and (4) a benefit-cost analysis. It was estimated that the Land Ferry would create over 45,788 temporary jobs in Nevada during the three-year construction period and 318 permanent jobs during operation. The majority of the benefits were attributed to savings in travel time ($356.4 M), vehicle operating costs ($1000.4 M), reduction of accidents ($544.6 M), and pavement maintenance ($503.2 M). These benefits would be a consequence of the shift of trucks from the highway, thus resulting in higher speeds, decrease fuel consumption, and decrease vehicle maintenance costs. The overall benefit-cost ratio of 1.7 implies a cost-effective project. PMID:27419201

  20. Construction cost forecast model : model documentation and technical notes.

    DOT National Transportation Integrated Search

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  1. Trends in highway construction costs in Louisiana : technical summary.

    DOT National Transportation Integrated Search

    1999-09-01

    The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...

  2. Evaluation of target efficiencies for solid-liquid separation steps in biofuels production.

    PubMed

    Kochergin, Vadim; Miller, Keith

    2011-01-01

    Development of liquid biofuels has entered a new phase of large scale pilot demonstration. A number of plants that are in operation or under construction face the task of addressing the engineering challenges of creating a viable plant design, scaling up and optimizing various unit operations. It is well-known that separation technologies account for 50-70% of both capital and operating cost. Additionally, reduction of environmental impact creates technological challenges that increase project cost without adding to the bottom line. Different technologies vary in terms of selection of unit operations; however, solid-liquid separations are likely to be a major contributor to the overall project cost. Despite the differences in pretreatment approaches, similar challenges arise for solid-liquid separation unit operations. A typical process for ethanol production from biomass includes several solid-liquid separation steps, depending on which particular stream is targeted for downstream processing. The nature of biomass-derived materials makes it either difficult or uneconomical to accomplish complete separation in a single step. Therefore, setting realistic efficiency targets for solid-liquid separations is an important task that influences overall process recovery and economics. Experimental data will be presented showing typical characteristics for pretreated cane bagasse at various stages of processing into cellulosic ethanol. Results of generic material balance calculations will be presented to illustrate the influence of separation target efficiencies on overall process recoveries and characteristics of waste streams.

  3. Costs of Occupational Injuries in Construction in the United States

    PubMed Central

    Waehrer, Geetha M.; Dong, Xiuwen S.; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2008-01-01

    This paper presents costs of fatal and non-fatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and non-fatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry’s total fatal and non-fatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs. PMID:17920850

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lozano, M.C.; Chalfoun, N.V.

    Bogota, Colombia, is the third highest capital in South America, its location near the equator assures high altitudes over the horizon and almost 5 hours of daily mean sunshine. Since 1981, efforts for using natural energy instead of nonrenewable fuel have been targeted to Colombia`s residential construction industry. This paper focuses on a computer aided design process for passive solar low-income row housing in Bogota. Thermal comfort for this tropical climate has been achieved through employing ``Guadua,`` a strong bamboo specie,as an alternative wall system to the traditional brick, adobe, or concrete structures. Through computer analysis, several energy conservation andmore » passive solar strategies have been optimized for a case study row housing type common to the region. The load savings compared to a 6 inch CMU house totaled 72%, while the operating cost has been reduced by 71%. Furthermore, this lightweight and inexpensive ``Guadua`` material has reduced the construction cost by 30%.« less

  5. 48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...

  6. Autonomous Sensors for Large Scale Data Collection

    NASA Astrophysics Data System (ADS)

    Noto, J.; Kerr, R.; Riccobono, J.; Kapali, S.; Migliozzi, M. A.; Goenka, C.

    2017-12-01

    Presented here is a novel implementation of a "Doppler imager" which remotely measures winds and temperatures of the neutral background atmosphere at ionospheric altitudes of 87-300Km and possibly above. Incorporating both recent optical manufacturing developments, modern network awareness and the application of machine learning techniques for intelligent self-monitoring and data classification. This system achieves cost savings in manufacturing, deployment and lifetime operating costs. Deployed in both ground and space-based modalities, this cost-disruptive technology will allow computer models of, ionospheric variability and other space weather models to operate with higher precision. Other sensors can be folded into the data collection and analysis architecture easily creating autonomous virtual observatories. A prototype version of this sensor has recently been deployed in Trivandrum India for the Indian Government. This Doppler imager is capable of operation, even within the restricted CubeSat environment. The CubeSat bus offers a very challenging environment, even for small instruments. The lack of SWaP and the challenging thermal environment demand development of a new generation of instruments; the Doppler imager presented is well suited to this environment. Concurrent with this CubeSat development is the development and construction of ground based arrays of inexpensive sensors using the proposed technology. This instrument could be flown inexpensively on one or more CubeSats to provide valuable data to space weather forecasters and ionospheric scientists. Arrays of magnetometers have been deployed for the last 20 years [Alabi, 2005]. Other examples of ground based arrays include an array of white-light all sky imagers (THEMIS) deployed across Canada [Donovan et al., 2006], oceans sensors on buoys [McPhaden et al., 2010], and arrays of seismic sensors [Schweitzer et al., 2002]. A comparable array of Doppler imagers can be constructed and deployed on the ground, to compliment the CubeSat data.

  7. High-power ultrafast Yb:fiber laser frequency combs using commercially available components and basic fiber tools

    NASA Astrophysics Data System (ADS)

    Li, Xinlong; Reber, Melanie A. R.; Corder, Christopher; Chen, Yuning; Zhao, Peng; Allison, Thomas K.

    2016-09-01

    We present a detailed description of the design, construction, and performance of high-power ultrafast Yb:fiber laser frequency combs in operation in our laboratory. We discuss two such laser systems: an 87 MHz, 9 W, 85 fs laser operating at 1060 nm and an 87 MHz, 80 W, 155 fs laser operating at 1035 nm. Both are constructed using low-cost, commercially available components, and can be assembled using only basic tools for cleaving and splicing single-mode fibers. We describe practical methods for achieving and characterizing low-noise single-pulse operation and long-term stability from Yb:fiber oscillators based on nonlinear polarization evolution. Stabilization of the combs using a variety of transducers, including a new method for tuning the carrier-envelope offset frequency, is discussed. High average power is achieved through chirped-pulse amplification in simple fiber amplifiers based on double-clad photonic crystal fibers. We describe the use of these combs in several applications, including ultrasensitive femtosecond time-resolved spectroscopy and cavity-enhanced high-order harmonic generation.

  8. Design and optimisation of novel configurations of stormwater constructed wetlands

    NASA Astrophysics Data System (ADS)

    Kiiza, Christopher

    2017-04-01

    Constructed wetlands (CWs) are recognised as a cost-effective technology for wastewater treatment. CWs have been deployed and could be retrofitted into existing urban drainage systems to prevent surface water pollution, attenuate floods and act as sources for reusable water. However, there exist numerous criteria for design configuration and operation of CWs. The aim of the study was to examine effects of design and operational variables on performance of CWs. To achieve this, 8 novel designs of vertical flow CWs were continuously operated and monitored (weekly) for 2years. Pollutant removal efficiency in each CW unit was evaluated from physico-chemical analyses of influent and effluent water samples. Hybrid optimised multi-layer perceptron artificial neural networks (MLP ANNs) were applied to simulate treatment efficiency in the CWs. Subsequently, predictive and analytical models were developed for each design unit. Results show models have sound generalisation abilities; with various design configurations and operational variables influencing performance of CWs. Although some design configurations attained faster and higher removal efficiencies than others; all 8 CW designs produced effluents permissible for discharge into watercourses with strict regulatory standards.

  9. Feasibility study report for the Imperial Valley Ethanol Refinery: a 14. 9-million-gallon-per-year ethanol synfuel refinery utilizing geothermal energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-03-01

    The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project ismore » economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.« less

  10. Y-12 Industrial Landfill V. Permit application modifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations requiremore » landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.« less

  11. CONSTRUCTION OF AN OXYGEN CHAMBER FOR THE TREATMENT OF PNEUMONIA

    PubMed Central

    Stadie, William C.

    1922-01-01

    1. The construction of an oxygen chamber is given. This chamber can be quickly filled with oxygen to any concentration up to 65 per cent and maintained at the desired concentration for an indefinite time. 2. The construction of ventilating system, cooling device, carbon dioxide remover, automatic oxygen analyzer, and filling and maintenance devices is given. 3. The chamber is designed so that pneumonia patients with anoxemia may be placed in it and breathe an atmosphere containing 40 to 60 per cent of oxygen. 4. The chamber is easy of ingress and egress, is economical in cost of operation, and comfortably accomodates patient and attendants so that adequate nursing and medical attention can be given at all times. PMID:19868609

  12. A low cost, high performance remotely controlled backhoe/excavator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, J.

    1995-12-31

    This paper addresses a state of the art, low cost, remotely controlled backhoe/excavator system for remediation use at hazardous waste sites. The all weather, all terrain, Remote Dig-It is based on a simple, proven construction platform and incorporates state of the art sensors, control, telemetry and other subsystems derived from advanced underwater remotely operated vehicle systems. The system can be towed to a site without the use of a trailer, manually operated by an on board operator or operated via a fiber optic or optional RF communications link by a remotely positioned operator. A proportional control system is piggy backedmore » onto the standard manual control system. The control system improves manual operation, allows rapid manual/remote mode selection and provides fine manual or remote control of all functions. The system incorporates up to 4 separate video links, acoustic obstacle proximity sensors, and stereo audio pickups and an optional differential GPS navigation. Video system options include electronic panning and tilting within a distortion-corrected wide angle field of view. The backhoe/excavator subsystem has a quick disconnect interface feature which allows its use as a manipulator with a wide variety of end effectors and tools. The Remote Dig-It was developed to respond to the need for a low-cost, effective remediation system for use at sites containing hazardous materials. The prototype system was independently evaluated for this purpose by the Army at the Jefferson Proving Ground where it surpassed all performance goals. At the time of this writing, the Remote Dig-It system is currently the only backhoe/excavator which met the Army`s goals for remediation systems for use at hazardous waste sites and it costs a fraction of any known competing offerings.« less

  13. a Low-Cost Chirped-Pulse Fourier Transform Microwave Spectrometer for Undergraduate Physical Chemistry Lab

    NASA Astrophysics Data System (ADS)

    Carroll, Brandon; Finneran, Ian; Blake, Geoffrey

    2014-06-01

    We present the design and construction of a simple and low-cost waveguide chirped pulse Fourier transform microwave (CP-FTMW) spectrometer suitable for gas-phase rotational spectroscopy experiments in undergraduate physical chemistry labs as well as graduate level research. The spectrometer operates with modest bandwidth, using phased locked loop (PLL) microwave sources and a direct digital synthesis (DDS) chirp source, making it an affordable for undergraduate labs. The performance of the instrument is benchmarked by acquiring the pure rotational spectrum of the J = 1 - 0 transition OCS and its isotopologues from 11-12.5 GHz.

  14. Phase 1: Definition of intercity transportation comparison framework. Volume 1: Summary. [operations research of passenger and freight transporatation systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A unified framework for comparing intercity passenger and freight transportation systems is presented. Composite measures for cost, service/demand, energy, and environmental impact were determined. A set of 14 basic measures were articulated to form the foundation for computing the composite measures. A parameter dependency diagram, constructed to explicitly interrelate the composite and basic measures is discussed. Ground rules and methodology for developing the values of the basic measures are provided and the use of the framework with existing cost and service data is illustrated for various freight systems.

  15. 48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...

  16. Waste water biological purification plants of dairy products industry and energy management

    NASA Astrophysics Data System (ADS)

    Stepanov, Sergey; Solkina, Olga; Stepanov, Alexander; Zhukova, Maria

    2017-10-01

    The paper presents results of engineering and economical comparison of waste water biological purification plants of dairy products industry. Three methods of purification are compared: traditional biological purification with the use of secondary clarifiers and afterpurification through granular-bed filters, biomembrane technology and physical-and-chemical treatment together with biomembrane technology for new construction conditions. The improvement of the biological purification technology using nitro-denitrification and membrane un-mixing of sludge mixture is a promising trend in this area. In these calculations, an energy management which is widely applied abroad was used. The descriptions of the three methods are illustrated with structural schemes. Costs of equipment and production areas are taken from manufacturers’ data. The research is aimed at an engineering and economical comparison of new constructions of waste water purification of dairy products industry. The experiment demonstrates advantages of biomembrane technology in waste water purification. This technology offers prospects of 122 million rubles cost saving during 25 years of operation when compared with of the technology of preparatory reagent flotation and of 13.7 million rubles cost saving compared to the option of traditional biological purification.

  17. Dilute Oxygen Combustion Phase IV Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riley, M.F.

    2003-04-30

    Novel furnace designs based on Dilute Oxygen Combustion (DOC) technology were developed under subcontract by Techint Technologies, Coraopolis, PA, to fully exploit the energy and environmental capabilities of DOC technology and to provide a competitive offering for new furnace construction opportunities. Capital cost, fuel, oxygen and utility costs, NOx emissions, oxide scaling performance, and maintenance requirements were compared for five DOC-based designs and three conventional air5-fired designs using a 10-year net present value calculation. A furnace direct completely with DOC burners offers low capital cost, low fuel rate, and minimal NOx emissions. However, these benefits do not offset the costmore » of oxygen and a full DOC-fired furnace is projected to cost $1.30 per ton more to operate than a conventional air-fired furnace. The incremental cost of the improved NOx performance is roughly $6/lb NOx, compared with an estimated $3/lb. NOx for equ8pping a conventional furnace with selective catalytic reduction (SCCR) technology. A furnace fired with DOC burners in the heating zone and ambient temperature (cold) air-fired burners in the soak zone offers low capital cost with less oxygen consumption. However, the improvement in fuel rate is not as great as the full DOC-fired design, and the DOC-cold soak design is also projected to cost $1.30 per ton more to operate than a conventional air-fired furnace. The NOx improvement with the DOC-cold soak design is also not as great as the full DOC fired design, and the incremental cost of the improved NOx performance is nearly $9/lb NOx. These results indicate that a DOC-based furnace design will not be generally competitive with conventional technology for new furnace construction under current market conditions. Fuel prices of $7/MMBtu or oxygen prices of $23/ton are needed to make the DOC furnace economics favorable. Niche applications may exist, particularly where access to capital is limited or floor space limitations are critical. DOC technology will continue to have a highly competitive role in retrofit applications requiring increases in furnace productivity.« less

  18. RAMI modeling of plant systems for proposed tritium production and extraction facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blanchard, A.

    2000-04-05

    The control of life-cycle cost is a primary concern during the development, construction, operation, and decommissioning of DOE systems and facilities. An effective tool that can be used to control these costs, beginning with the design stage, is called a reliability, availability, maintainability, and inspectability analysis or, simply, RAMI for short. In 1997, RAMI technology was introduced to the Savannah River Site with applications at the conceptual design stage beginning with the Accelerator Production of Tritium (APT) Project and later extended to the Commercial Light Water Reactor (CLWR) Tritium Extraction Facility (TEF) Project. More recently it has been applied tomore » the as-build Water Treatment Facilities designed for ground water environmental restoration. This new technology and database was applied to the assessment of balance-of-plant systems for the APT Conceptual Design Report. Initial results from the Heat Removal System Assessment revealed that the system conceptual design would cause the APT to fall short of its annual production goal. Using RAM technology to immediately assess this situation, it was demonstrated that the product loss could be gained back by upgrading the system's chiller unit capacity at a cost of less than $1.3 million. The reclaimed production is worth approximately $100 million. The RAM technology has now been extended to assess the conceptual design for the CLWR-TEF Project. More specifically, this technology and database is being used to translate high level availability goals into lower level system design requirements that will ensure the TEF meets its production goal. Results, from the limited number of system assessments performed to date, have already been used to modify the conceptual design for a remote handling system, improving its availability to the point that a redundant system, with its associated costs of installation and operation may no longer be required. RAMI results were also used to justify the elimination of a metal uranium bed in the design of a water cracker system, producing a significant reduction in the estimated construction and operating costs.« less

  19. The use of patient factors to improve the prediction of operative duration using laparoscopic cholecystectomy.

    PubMed

    Thiels, Cornelius A; Yu, Denny; Abdelrahman, Amro M; Habermann, Elizabeth B; Hallbeck, Susan; Pasupathy, Kalyan S; Bingener, Juliane

    2017-01-01

    Reliable prediction of operative duration is essential for improving patient and care team satisfaction, optimizing resource utilization and reducing cost. Current operative scheduling systems are unreliable and contribute to costly over- and underestimation of operative time. We hypothesized that the inclusion of patient-specific factors would improve the accuracy in predicting operative duration. We reviewed all elective laparoscopic cholecystectomies performed at a single institution between 01/2007 and 06/2013. Concurrent procedures were excluded. Univariate analysis evaluated the effect of age, gender, BMI, ASA, laboratory values, smoking, and comorbidities on operative duration. Multivariable linear regression models were constructed using the significant factors (p < 0.05). The patient factors model was compared to the traditional surgical scheduling system estimates, which uses historical surgeon-specific and procedure-specific operative duration. External validation was done using the ACS-NSQIP database (n = 11,842). A total of 1801 laparoscopic cholecystectomy patients met inclusion criteria. Female sex was associated with reduced operative duration (-7.5 min, p < 0.001 vs. male sex) while increasing BMI (+5.1 min BMI 25-29.9, +6.9 min BMI 30-34.9, +10.4 min BMI 35-39.9, +17.0 min BMI 40 + , all p < 0.05 vs. normal BMI), increasing ASA (+7.4 min ASA III, +38.3 min ASA IV, all p < 0.01 vs. ASA I), and elevated liver function tests (+7.9 min, p < 0.01 vs. normal) were predictive of increased operative duration on univariate analysis. A model was then constructed using these predictive factors. The traditional surgical scheduling system was poorly predictive of actual operative duration (R 2  = 0.001) compared to the patient factors model (R 2  = 0.08). The model remained predictive on external validation (R 2  = 0.14).The addition of surgeon as a variable in the institutional model further improved predictive ability of the model (R 2  = 0.18). The use of routinely available pre-operative patient factors improves the prediction of operative duration during cholecystectomy.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenji Akagi; Masayuki Ishiwata; Kenji Araki

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and generalmore » versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)« less

  1. Efficiency Assessment of Support Mechanisms for Wood-Fired Cogeneration Development in Estonia

    NASA Astrophysics Data System (ADS)

    Volkova, Anna; Siirde, Andres

    2010-01-01

    There are various support mechanisms for wood-fired cogeneration plants, which include both support for cogeneration development and stimulation for increasing consumption of renewable energy sources. The efficiency of these mechanisms is analysed in the paper. Overview of cogeneration development in Estonia is given with the focus on wood-fired cogeneration. Legislation acts and amendments, related to cogeneration support schemes, were described. For evaluating the efficiency of support mechanisms an indicator - fuel cost factor was defined. This indicator includes the costs related to the chosen fuel influence on the final electricity generation costs without any support mechanisms. The wood fuel cost factors were compared with the fuel cost factors for peat and oil shale. For calculating the fuel cost factors, various data sources were used. The fuel prices data were based on the average cost of fuels in Estonia for the period from 2000 till 2008. The data about operating and maintenance costs, related to the fuel type in the case of comparing wood fuel and oil shale fuel were taken from the CHP Balti and Eesti reports. The data about operating and maintenance costs used for peat and wood fuel comparison were taken from the Tallinn Elektrijaam reports. As a result, the diagrams were built for comparing wood and its competitive fuels. The decision boundary lines were constructed on the diagram for the situation, when no support was provided for wood fuels and for the situations, when various support mechanisms were provided during the last 12 years.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  3. Highway Cost Index Estimator Tool

    DOT National Transportation Integrated Search

    2017-10-01

    To plan and program highway construction projects, the Texas Department of Transportation requires accurate construction cost data. However, due to the number of, and uncertainty of, variables that affect highway construction costs, estimating future...

  4. Hypervelocity Impact Testing of Materials for Additive Construction: Applications on Earth, the Moon, and Mars

    NASA Technical Reports Server (NTRS)

    Ordonez, Erick; Edmunson, Jennifer; Fiske, Michael; Christiansen, Eric; Miller, Josh; Davis, Bruce Alan; Read, Jon; Johnston, Mallory; Fikes, John

    2017-01-01

    Additive Construction is the process of building infrastructure such as habitats, garages, roads, berms, etcetera layer by layer (3D printing). The National Aeronautics and Space Administration (NASA) and the United States Army Corps of Engineers (USACE) are pursuing additive construction to build structures using resources available in-situ. Using materials available in-situ reduces the cost of planetary missions and operations in theater. The NASA team is investigating multiple binders that can be produced on planetary surfaces, including the magnesium oxide-based Sorel cement; the components required to make Ordinary Portland Cement (OPC), the common cement used on Earth, have been found on Mars. The availability of OPC-based concrete on Earth drove the USACE to pursue additive construction for base housing and barriers for military operations. Planetary and military base structures must be capable of resisting micrometeoroid impacts with velocities ranging from 11 to 72km/s for particle sizes 200 micrometers or more (depending on protection requirements) as well as bullets and shrapnel with a velocity of 1.036km/s with projectiles 5.66mm diameter and 57.40mm in length, respectively.

  5. Design of combination biofilter and subsurface constructed wetland-multilayer filtration with vertical flow type using Vetiveria zizanioides (akar wangi)

    NASA Astrophysics Data System (ADS)

    Astuti, A. D.; Lindu, M.; Yanidar, R.; Faruq, M.

    2018-01-01

    As environmental regulation has become stricter in recent years, there is an increasing concern about the issue of wastewater treatment in urban areas. Senior High School as center of student activity has a potential source to generated domestic wastewater from toilet, bathroom and canteen. Canteen wastewater contains high-organic content that to be treated before discharged. Based on previous research the subsurface constructed wetland-multilayer filtration with vertical flow is an attractive alternative to provide efficient treatment of canteen wastewater. The effluent concentration complied with regulation according to [9]. Due to limited land, addition of preliminary treatment such as the presence of biofilter was found to improve the performance. The aim of this study was to design combination biofilter and subsurface constructed wetland-multilayer filtration with vertical flow type using vetiveria zizanioides (akar wangi) treating canteen wastewater. Vetiveria zizanioides (akar wangi) is used because from previous research, subsurface constructed wetland-multilayer filtration (SCW-MLF) with vertical flow type using vetiveria zizanioides (akar wangi) can be an alternative canteen wastewater treatment that is uncomplicated in technology, low cost in operational and have a beautiful landscape view, besides no odors or insects were presented during the operation.

  6. Cost and time study for constructing raised wood floor systems in the Gulf Coast Region of the United States

    Treesearch

    Marie Del Bianco; David B. McKeever; Lance Barta

    2012-01-01

    This report is the result of a co-operative effort between the USDA Forest Service, Forest Products Laboratory (FPL) Advanced Housing Research Center, the National Assocation of Home Builders (NAHB) Research Center, and builder members of the Metropolitan Mobile and Baldwin County Home Builders Associations. The study was undertaken to further knowledge that will...

  7. 7 CFR 1710.2 - Definitions and rules of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... as follows: EC16SE91.000 where: A=Distribution (plant), which equals Part E, Line 14(e) of RUS Form 7; B=General Plant, which equals Part E, Line 24(e) of RUS Form 7; C=Operating Revenue and Patronage Capital, which equals Part A, Line 1 of RUS Form 7; and D=Cost of Power, which equals the sum of Part A...

  8. 7 CFR 1710.2 - Definitions and rules of construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...=Distribution (plant), which equals Part E, Line 14(e) of RUS Form 7; B=General Plant, which equals Part E, Line 24(e) of RUS Form 7; C=Operating Revenue and Patronage Capital, which equals Part A, Line 1 of RUS Form 7; and D=Cost of Power, which equals the sum of Part A, Lines 2, 3, and 4 of RUS Form 7. Area...

  9. 7 CFR 1710.2 - Definitions and rules of construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... as follows: EC16SE91.000 where: A=Distribution (plant), which equals Part E, Line 14(e) of RUS Form 7; B=General Plant, which equals Part E, Line 24(e) of RUS Form 7; C=Operating Revenue and Patronage Capital, which equals Part A, Line 1 of RUS Form 7; and D=Cost of Power, which equals the sum of Part A...

  10. 7 CFR 1710.2 - Definitions and rules of construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... as follows: EC16SE91.000 where: A=Distribution (plant), which equals Part E, Line 14(e) of RUS Form 7; B=General Plant, which equals Part E, Line 24(e) of RUS Form 7; C=Operating Revenue and Patronage Capital, which equals Part A, Line 1 of RUS Form 7; and D=Cost of Power, which equals the sum of Part A...

  11. 7 CFR 1710.2 - Definitions and rules of construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... as follows: EC16SE91.000 where: A=Distribution (plant), which equals Part E, Line 14(e) of RUS Form 7; B=General Plant, which equals Part E, Line 24(e) of RUS Form 7; C=Operating Revenue and Patronage Capital, which equals Part A, Line 1 of RUS Form 7; and D=Cost of Power, which equals the sum of Part A...

  12. United States Air Force Agency Financial Report 2014

    DTIC Science & Technology

    2014-01-01

    basic sciences and 45 semester hours in humanities and social sciences . This 90 semester hour total comprises 60 percent of the total academic...Test and Evaluation Support $723 F-35 $628 Defense Research Sciences $373 GPS III-Operational Control Segment $373 Long Range Strike Bomber $359...Development, Test & Evaluation Family Housing & Military Construction (Less: Earned Revenue) Net Cost before Losses/ (Gains) from Actuarial Assumption

  13. Hualapai Tribal Utility Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hualapai Tribal Nation

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central powermore » grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.« less

  14. Sensitivity analysis of physiological factors in space habitat design

    NASA Technical Reports Server (NTRS)

    Billingham, J.

    1982-01-01

    The costs incurred by design conservatism in space habitat design are discussed from a structural standpoint, and areas of physiological research into less than earth-normal conditions that offer the greatest potential decrease in habitat construction and operating costs are studied. The established range of human tolerance limits is defined for those physiological conditions which directly affect habitat structural design. These entire ranges or portions thereof are set as habitat design constraints as a function of habitat population and degree of ecological closure. Calculations are performed to determine the structural weight and cost associated with each discrete population size and its selected environmental conditions, on the basis of habitable volume equivalence for four basic habitat configurations: sphere, cylinder with hemispherical ends, torus, and crystal palace.

  15. 25 CFR 136.2 - Construction costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...

  16. 25 CFR 136.2 - Construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...

  17. 48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...

  18. A multidisciplinary approach to the development of low-cost high-performance lightwave networks

    NASA Technical Reports Server (NTRS)

    Maitan, Jacek; Harwit, Alex

    1991-01-01

    Our research focuses on high-speed distributed systems. We anticipate that our results will allow the fabrication of low-cost networks employing multi-gigabit-per-second data links for space and military applications. The recent development of high-speed low-cost photonic components and new generations of microprocessors creates an opportunity to develop advanced large-scale distributed information systems. These systems currently involve hundreds of thousands of nodes and are made up of components and communications links that may fail during operation. In order to realize these systems, research is needed into technologies that foster adaptability and scaleability. Self-organizing mechanisms are needed to integrate a working fabric of large-scale distributed systems. The challenge is to fuse theory, technology, and development methodologies to construct a cost-effective, efficient, large-scale system.

  19. The health regionalization process from the perspective of the transation cost theory.

    PubMed

    Sancho, Leyla Gomes; Geremia, Daniela Savi; Dain, Sulamis; Geremia, Fabiano; Leão, Cláudio José Silva

    2017-04-01

    This study analyzes the incidence of transaction costs in the regionalization process of health policies in the Brazilian federal system. In this work, regionalized health actions contracted and agreed between federal agencies have assumed a transactional nature. A conceptual theoretical essay of reflective nature was prepared with the purpose of questioning and proposing new approaches to improve the health regionalization process. The main considerations suggest that institutional management tools proposed by the standards and regulations of the Unified Health System have a low potential to reduce transaction costs, especially due to hardships in reconciling common goals among the entities, environment surrounded by uncertainty, asymmetries and incomplete information, bounded rationality and conflict of interest. However, regionalization can reduce the incidence of social and/or operational costs, through improved access to health and the construction of more efficient governance models.

  20. Long-term performance of a 20-L continuous flow microbial fuel cell for treatment of brewery wastewater

    NASA Astrophysics Data System (ADS)

    Lu, Mengqian; Chen, Shing; Babanova, Sofia; Phadke, Sujal; Salvacion, Michael; Mirhosseini, Auvid; Chan, Shirley; Carpenter, Kayla; Cortese, Rachel; Bretschger, Orianna

    2017-07-01

    Microbial fuel cells (MFCs) have been shown as a promising technology for wastewater treatment. Integration of MFCs into current wastewater treatment plant have potential to reduce the operational cost and improve the treatment performance, and scaling up MFCs will be essential. However, only a few studies have reported successful scale up attempts. Fabrication cost, treatment performance and operational lifetime are critical factors to optimize before commercialization of MFCs. To test these factors, we constructed a 20 L MFC system containing two 10 L MFC reactors and operated the system with brewery wastewater for nearly one year. Several operational conditions were tested, including different flowrates, applied external resistors, and poised anodic potentials. The condition resulting in the highest chemical oxygen demand (COD) removal efficiency (94.6 ± 1.0%) was a flow rate of 1 mL min-1 (HRT = 313 h) and an applied resistor of 10 Ω across each MFC circuit. Results from each of the eight stages of operation (325 days total) indicate that MFCs can sustain treatment rates over a long-term period and are robust enough to sustain performance even after system perturbations. possible ways to improve MFC performance were discussed for future studies.

  1. MAN-004 Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-07-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less

  2. Automation of a Versatile Crane (the LSMS) for Lunar Outpost Construction, Maintenance and Inspection

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Roithmayr, Carlos M.; Dorsey, John T.; Jones, Thomas C.; Shen, Haijun; Seywald, Hans; King, Bruce D.; Mikulas, Martin M., Jr.

    2009-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earth-based construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) lightweight components, b) compact packaging for launch, c) automated deployment, d) simple in-field reconfiguration and repair, and e) support for tele-operated or automated operations. Also, because the cost to transport mass to the lunar surface is very high, the number of devices that can be dedicated to surface operations will be limited. Thus, in contrast to Earth-based construction, where many single-purpose devices dominate a construction site, a lunar outpost will require a limited number of versatile devices that provide operational benefit from initial construction through sustained operations. The first generation test-bed of a new high performance device, the Lunar Surface Manipulation System (LSMS) has been designed, built and field tested. The LSMS has many unique features resulting in a mass efficient solution to payload handling on the lunar surface. Typically, the LSMS device mass is estimated at approximately 3% of the mass of the heaviest payload lifted at the tip, or 1.8 % of the mass of the heaviest mass lifted at the elbow or mid-span of the boom for a high performance variant incorporating advanced structural components. Initial operational capabilities of the LSMS were successfully demonstrated during field tests at Moses Lake, Washington using a tele-operated approach. Joint angle sensors have been developed for the LSMS to improve operator situational awareness. These same sensors provide the necessary information to support fully automated operations, greatly expanding the operational versatility of the LSMS. This paper develops the equations describing the forward and inverse relation between LSMS joint angles and Cartesian coordinates of the LSMS tip. These equations allow a variety of schemes to be used to maneuver the LSMS to optimize the maneuver. One such scheme will be described in detail that eliminates undesirable swinging of the payload at the conclusion of a maneuver, even when the payload is suspended from a passive rigid link. The swinging is undesirable when performing precision maneuvers, such as aligning an object for mating or positioning a camera. Use of the equations described here enables automated control of the LSMS greatly improving its operational versatility.

  3. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    NASA Astrophysics Data System (ADS)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  4. Carbon dioxide capture from atmospheric air using sodium hydroxide spray.

    PubMed

    Stolaroff, Joshuah K; Keith, David W; Lowry, Gregory V

    2008-04-15

    In contrast to conventional carbon capture systems for power plants and other large point sources, the system described in this paper captures CO2 directly from ambient air. This has the advantages that emissions from diffuse sources and past emissions may be captured. The objective of this research is to determine the feasibility of a NaOH spray-based contactor for use in an air capture system by estimating the cost and energy requirements per unit CO2 captured. A prototype system is constructed and tested to measure CO2 absorption, energy use, and evaporative water loss and compared with theoretical predictions. A numerical model of drop collision and coalescence is used to estimate operating parameters for a full-scale system, and the cost of operating the system per unit CO2 captured is estimated. The analysis indicates that CO2 capture from air for climate change mitigation is technically feasible using off-the-shelf technology. Drop coalescence significantly decreases the CO2 absorption efficiency; however, fan and pump energy requirements are manageable. Water loss is significant (20 mol H2O/mol CO2 at 15 degrees C and 65% RH) but can be lowered by appropriately designing and operating the system. The cost of CO2 capture using NaOH spray (excluding solution recovery and CO2 sequestration, which may be comparable) in the full-scale system is 96 $/ton-CO2 in the base case, and ranges from 53 to 127 $/ton-CO2 under alternate operating parameters and assumptions regarding capital costs and mass transfer rate. The low end of the cost range is reached by a spray with 50 microm mean drop diameter, which is achievable with commercially available spray nozzles.

  5. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    ERIC Educational Resources Information Center

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  6. Belowground advantages in construction cost facilitate a cryptic plant invasion

    PubMed Central

    Caplan, Joshua S.; Wheaton, Christine N.; Mozdzer, Thomas J.

    2014-01-01

    The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. PMID:24938305

  7. Social cost in construction projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less

  8. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  9. Economic efficiency of application of innovative materials and structures in high-rise construction

    NASA Astrophysics Data System (ADS)

    Golov, Roman; Dikareva, Varvara; Gorshkov, Roman; Agarkov, Anatoly

    2018-03-01

    The article is devoted to the analysis of technical and economic efficiency of application of tube confined concrete structures in high-rise construction. The study of comparative costs of materials with the use of different supporting columns was carried out. The main design, operational, technological and economic advantages of the tube confined concrete technology were evaluated, conclusions were drawn about the high strength and deformation properties of axial compression of steel tubes filled with high-strength concrete. The efficiency of the tube confined concrete use is substantiated, which depends mainly on the scale factor and percentage of reinforcement affecting its load-bearing capacity.

  10. Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.

  11. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  12. Manufacture of ammonium sulfate fertilizer from gypsum-rich byproduct of flue gas desulfurization - A prefeasibility cost estimate

    USGS Publications Warehouse

    Chou, I.-Ming; Rostam-Abadi, M.; Lytle, J.M.; Achorn, F.P.

    1996-01-01

    Costs for constructing and operating a conceptual plant based on a proposed process that converts flue gas desulfurization (FGD)-gypsum to ammonium sulfate fertilizer has been calculated and used to estimate a market price for the product. The average market price of granular ammonium sulfate ($138/ton) exceeds the rough estimated cost of ammonium sulfate from the proposed process ($111/ ton), by 25 percent, if granular size ammonium sulfate crystals of 1.2 to 3.3 millimeters in diameters can be produced by the proposed process. However, there was at least ??30% margin in the cost estimate calculations. The additional costs for compaction, if needed to create granules of the required size, would make the process uneconomical unless considerable efficiency gains are achieved to balance the additional costs. This study suggests the need both to refine the crystallization process and to find potential markets for the calcium carbonate produced by the process.

  13. Research on the optimization of quota design in real estate

    NASA Astrophysics Data System (ADS)

    Sun, Chunling; Ma, Susu; Zhong, Weichao

    2017-11-01

    Quota design is one of the effective methods of cost control in real estate development project and widely used in the current real estate development project to control the engineering construction cost, but quota design have many deficiencies in design process. For this purpose, this paper put forward a method to achieve investment control of real estate development project, which combine quota design and value engineering(VE) at the stage of design. Specifically, it’s an optimizing for the structure of quota design. At first, determine the design limits by investment estimate value, then using VE to carry on initial allocation of design limits and gain the functional target cost, finally, consider the whole life cycle cost (LCC) and operational problem in practical application to finish complex correction for the functional target cost. The improved process can control the project cost more effectively. It not only can control investment in a certain range, but also make the project realize maximum value within investment.

  14. Object-Oriented Technology-Based Software Library for Operations of Water Reclamation Centers

    NASA Astrophysics Data System (ADS)

    Otani, Tetsuo; Shimada, Takehiro; Yoshida, Norio; Abe, Wataru

    SCADA systems in water reclamation centers have been constructed based on hardware and software that each manufacturer produced according to their design. Even though this approach used to be effective to realize real-time and reliable execution, it is an obstacle to cost reduction about system construction and maintenance. A promising solution to address the problem is to set specifications that can be used commonly. In terms of software, information model approach has been adopted in SCADA systems in other field, such as telecommunications and power systems. An information model is a piece of software specification that describes a physical or logical object to be monitored. In this paper, we propose information models for operations of water reclamation centers, which have not ever existed. In addition, we show the feasibility of the information model in terms of common use and processing performance.

  15. Design, construction and operation of a new filter approach for treatment of surface waters in Southeast Asia

    NASA Astrophysics Data System (ADS)

    Frankel, R. J.

    1981-05-01

    A simple, inexpensive, and efficient method of water treatment for rural communities in Southeast Asia was developed using local materials as filter media. The filter utilizes coconut fiber and burnt rice husks in a two-stage filtering process designed as a gravityfed system without the need for backwashing, and eliminates in most cases the need of any chemicals. The first-stage filter with coconut fiber acts essentially as a substitute for the coagulation and sedimentation phases of conventional water-treatment plants. The second-stage filter, using burnt rice husks, is similar to slow sand filtration with the additional benefits of taste, color and odor removals through the absorption properties of the activated carbon in the medium. This paper reports on the design, construction costs, and operating results of several village size units in Thailand and in the Philippines.

  16. A bi-objective model for robust yard allocation scheduling for outbound containers

    NASA Astrophysics Data System (ADS)

    Liu, Changchun; Zhang, Canrong; Zheng, Li

    2017-01-01

    This article examines the yard allocation problem for outbound containers, with consideration of uncertainty factors, mainly including the arrival and operation time of calling vessels. Based on the time buffer inserting method, a bi-objective model is constructed to minimize the total operational cost and to maximize the robustness of fighting against the uncertainty. Due to the NP-hardness of the constructed model, a two-stage heuristic is developed to solve the problem. In the first stage, initial solutions are obtained by a greedy algorithm that looks n-steps ahead with the uncertainty factors set as their respective expected values; in the second stage, based on the solutions obtained in the first stage and with consideration of uncertainty factors, a neighbourhood search heuristic is employed to generate robust solutions that can fight better against the fluctuation of uncertainty factors. Finally, extensive numerical experiments are conducted to test the performance of the proposed method.

  17. Evaluation of green building rating tools based on existing green building achievement in Indonesia using Life Cycle Assessment Method

    NASA Astrophysics Data System (ADS)

    Basten, Van; Latief, Yusuf; Berawi, Mohammed Ali; Budiman, Rachmat; Riswanto

    2017-03-01

    Total completed building construction value in Indonesia increased 116% during 2009 to 2011. That's followed by increasing 11% energy consumption in Indonesia in the last three years with 70% energy met to the electricity needs of commercial building. In addition, a few application of green building concept in Indonesia made the greenhouse gas emissions or CO2 amount increased by 25%. Construction, operation, and maintain of building cost consider relatively high. The evaluation in this research is used to improve the building performance with some of green concept alternatives. The research methodology is conducted by combination of qualitative and quantitative approaches through interview and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment (LCA) Method. The result of optimization that is the largest efficiency and effective of building life cycle.

  18. Possibilities for the Production of Heavy Water in Argentina. Report No. 90; POSIBILIDADES ARGENTINAS PARA LA PRODUCCION DE AGUA PESADA. Informe No. 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silberman, E.; Cretella, R.F.

    1963-01-01

    As an introduction to the problems in the industrial production of heavy water, the industrial plants in operation are briefly described, and the causes determining their evolution are discussed. The industrial methods studied in England, France, Germandy, Sweden, Switzerland, India, Egypt, Japan, and O.E.C.E. for the production of D/sub 2/O are summarized. The market for heavy water is discussed. The factors considered in the selection of the production process to be developed for Argentina are given, and the cost of a H/sub 2/S-- H/sub 2/O exchange installation is determined. The cost of such a plant modified for Argentine needs ismore » then analyzed. It is concluded that the combination of the H/ sub 2/SH/sub 2/O process in a single unit with integral energy supply, coupled with the elimination of auxiliary installations, results in a considerable reduction in operation costs and plant investment, as compared with the cost of the process in the U.S. The plandt construction plan is summarized. (J.S.R.)« less

  19. Exploring the Deployment Potential of Small Modular Reactors

    NASA Astrophysics Data System (ADS)

    Abdulla, Ahmed Y.

    This thesis reports the results of several investigations into the viability of an emergent technology. Due to the lack of data in such cases, and the sensitivity surrounding nuclear power, exploring the potential of small modular reactors (SMRs) proved challenging. Moreover, these reactors come in a wide range of sizes and can employ a number of technologies, which made investigating the category as a whole difficult. We started by looking at a subset of SMRs that were the most promising candidates for near to mid-term deployment: integral light water SMRs. We conducted a technically detailed elicitation of expert assessments of their capital costs and construction duration, focusing on five reactor deployment scenarios that involved a large reactor and two light water SMRs. Consistent with the uncertainty introduced by past cost overruns and construction delays, median estimates of the cost of new large plants varied by more than a factor of 2.5. Expert judgments about likely SMR costs displayed an even wider range. There was consensus that an SMR plant's construction duration would be shorter than a large reactor's. Experts identified more affordable unit cost, factory fabrication, and shorter construction schedules as factors that may make light water SMRs economically viable, though these reactors do not constitute a paradigm shift when it comes to nuclear power's safety and security. Using these expert assessments of cost and construction duration, we calculated levelized cost of electricity values for four of the five scenarios. For the large plant, median levelized cost estimates ranged from 56 to 120 per MWh. Median estimates of levelized cost ranged from 77 to 240 per MWh for a 45MWe SMR, and from 65 to 120 per MWh for a 225MWe unit. We concluded that controlling construction duration is important, though not as important a factor in the analysis as capital cost, and, given the price of electricity in some parts of the U.S., it is possible to construct an argument for deploying SMRs in certain locations. We then decided to investigate the technical and institutional barriers hampering the development and deployment of a subset of six SMRs, including two light water designs and four non-light water advanced designs. We organized an invitational workshop that became an integrated assessment of various designs and of the institutional innovations required to bring SMRs to market. Some valuable insights were gleaned from the workshop: there is consensus that many of the challenges facing advanced SMRs are rooted in institutional biases in favor of the light water economy, as opposed to technical ones. The institutional factors that are judged to pose the greatest challenge to the mass deployment of SMRs are: the lack of a greenhouse gas control regime; political and financial instability; public concerns about nuclear safety and waste; and inadequate national and international institutions. When asked what factors most help promote SMR adoption in OECD and developing countries, economic factors dominate the list of characteristics that most contribute to their promotion in OECD countries but, when it comes to developing countries, institutional factors are regarded as being of highest import. Safety of design and safety in operation are judged the most important characteristic on both lists.

  20. An ANSERLIN array for mobile satellite applications

    NASA Technical Reports Server (NTRS)

    Colomb, F. Y.; Kunkee, D. B.; Mayes, P. E.; Smith, D. W.; Jamnejad, V.

    1990-01-01

    Design, analysis, construction, and test of linear arrays of ANSERLIN (annular sector, radiating line) elements are reported and discussed. Due to feeding simplicity and easy construction as well as good CP performance, a planar array composed of a number of such linear arrays each producing a shaped beam tilted in elevation, is a good candidate as a vehicle-mounted mechanically steered antenna for mobile satellite applications. A single level construction technique was developed that makes this type of array very cost competitive with other low-profile arrays. An asymmetric 19.5 inch long four-element array was fabricated and tested with reasonable performance. A smaller five-element symmetric array (16 inch long) was also designed and tested capable of operating in either sense of circular polarization. Efforts were made to successfully reduce this effect.

  1. Fuel cell power plant economic and operational considerations

    NASA Technical Reports Server (NTRS)

    Lance, J. R.

    1984-01-01

    Fuel cell power plants intended for electric utility and cogeneration applications are now in the design and construction stage. This paper describes economic and operational considerations being used in the development and design of plants utilizing air cooled phosphoric acid fuel cells. Fuel cell power plants have some unique characteristics relative to other types of power plants. As a result it was necessary to develop specific definitions of the fuel cell power plant characteristics in order to perform cost of electricity calculations. This paper describes these characteristics and describes the economic analyses used in the Westinghouse fuel cell power plant program.

  2. Analysis of space tug operating techniques. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The design requirements for space tug systems and cost analysis of the refurbishment phases are discussed. The vehicle is an integral propulsion stage using liquid hydrogen and liquid oxygen as propellants and is capable of operating either as a fully or a partially autonomous vehicle. Structural features are an integral liquid hydrogen tank, a liquid oxygen tank, a meteoroid shield, an aft conical docking and structural support ring, and a staged combustion main engine. The vehicle is constructed of major modules for ease of maintenance. Line drawings and block diagrams are included to explain the maintenance requirements for the subsystems.

  3. An improved waste collection system for space flight

    NASA Technical Reports Server (NTRS)

    Thornton, William E.; Lofland, William W., Jr.; Whitmore, Henry

    1986-01-01

    Waste collection systems are a critical part of manned space flight. Systems to date have had a number of deficiencies. A new system, which uses a simple mechanical piston compactor and disposable pads allows a clean area for defecation and maximum efficiency of waste collection and storage. The concept has been extensively tested. Flight demonstration units are being built, tested, and scheduled for flight. A prototype operational unit is under construction. This system offers several advantages over existing or planned systems in the areas of crew interface and operation, cost, size, weight, and maintenance and power consumption.

  4. Mobile/Modular BSL-4 Facilities for Meeting Restricted Earth Return Containment Requirements

    NASA Technical Reports Server (NTRS)

    Calaway, M. J.; McCubbin, F. M.; Allton, J. H.; Zeigler, R. A.; Pace, L. F.

    2017-01-01

    NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection Office require sample containment and biohazard testing in a receiving laboratory as directed by NASA Procedural Requirement (NPR) 8020.12D - ensuring the preservation and protection of Earth and the sample. Currently, NPR 8020.12D classifies Restricted Earth Return for robotic sample return missions from Mars, Europa, and Enceladus with the caveat that future proposed mission locations could be added or restrictions lifted on a case by case basis as scientific knowledge and understanding of biohazards progresses. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, Biosafety Level (BSL) 4 standards and protocols are used to study the most dangerous high-risk diseases and unknown biological agents on Earth. Over 30 BSL-4 facilities have been constructed worldwide with 12 residing in the United States; of theses, 8 are operational. In the last two decades, these brick and mortar facilities have cost in the hundreds of millions of dollars dependent on the facility requirements and size. Previous mission concept studies for constructing a NASA sample receiving facility with an integrated BSL-4 quarantine and biohazard testing facility have also been estimated in the hundreds of millions of dollars. As an alternative option, we have recently conducted an initial trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a faction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in approximately 90% cost reduction when compared to traditional construction methods without compromising the preservation of the sample or Earth.

  5. Exploring the cost and value of private versus shared bedrooms in nursing homes.

    PubMed

    Calkins, Margaret; Cassella, Christine

    2007-04-01

    There is debate about the relative merits and costs of private versus shared bedrooms in nursing homes, particularly in light of the current efforts at creating both cost-efficient and person-centered care facilities. The purpose of this project was to explore the extent to which there is evidence-based information that supports the merits of three different bedroom configurations: traditional shared, enhanced shared, and private. We developed a framework of four broad domains that were related to the different bedroom configurations: psychosocial, clinical, operational, and construction or building factors. Within each dimension, we identified individual factors through the literature, interviews, and focus groups, with the goal of determining the breadth, depth, and quality of evidence supporting the benefits of one configuration over another. The vast majority of factors identified in this study, regardless of whether there was solid empirical data, information from the focus groups, or other anecdotal evidence, indicated better outcomes associated with private rooms over shared rooms in nursing homes. Cost estimates suggest that construction cost (plus debt service) differences range from roughly $20,506 per bed for a traditional shared room to $36,515 for a private one, and that such differences are recouped in less than 2 years if beds are occupied, and in less than 3 months if a shared bed remains unoccupied at average private-pay room costs. Despite limited empirical evidence in some areas, this project provides the foundation for an evidence-based life-cycle costing perspective regarding the relative merits of different bedroom configurations.

  6. Space construction base support requirements for environmental control and life support systems

    NASA Technical Reports Server (NTRS)

    Thiele, R. J.; Secord, T. C.; Murphy, G. L.

    1977-01-01

    A Space Station analysis study is being performed for NASA which identifies cost-effective Space Station options that can provide a space facility capable of performing space construction, space manufacturing, cosmological research, earth services, and other functions. A space construction base concept for the construction of large structures, such as those needed to implement satellite solar power for earth usage, will be used as a basis for discussing requirements that impact the design selection, level of integration, and operation of environmental control and life support systems (ECLSS). The space construction base configuration also provides a basic Space Station facility that can accommodate biological manufacturing modules, ultrapure glasses manufacturing modules, and modules for other services in a building-block fashion. Examples of special problems that could dictate hardware required to augment the basic ECLSS for autonomous modules will be highlighted. Additionally, overall intravehicular (IVA) and extravehicular (EVA) activities and requirements that could impact the basic station ECLSS degree of closure are discussed.

  7. Life comparative analysis of energy consumption and CO₂ emissions of different building structural frame types.

    PubMed

    Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok

    2013-01-01

    The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO₂ emissions of input materials for each structural frame type. In addition, the CO₂ emissions cost was measured using the trading price of CO₂ emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO₂ emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO₂ emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future.

  8. Putting the environment into the NPV calculation -- Quantifying pipeline environmental costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A.

    1996-12-31

    Pipeline projects impact the environment through soil and habitat disturbance, noise during construction and compressor operation, river crossing disturbance and the risk of rupture. Assigning monetary value to these negative project consequences enables the environment to be represented in the project cost-benefit analysis. This paper presents the mechanics and implications of two environmental valuation techniques: (1) the contingent valuation method and (2) the stated preference method. The use of environmental value at the project economic-evaluation stage is explained. A summary of research done on relevant environmental attribute valuation is presented and discussed. Recommendations for further research in the field aremore » made.« less

  9. Lunar Surface-to-Surface Power Transfer

    NASA Technical Reports Server (NTRS)

    Kerslake, Thomas W.

    2007-01-01

    A human lunar outpost, under NASA study for construction in the 2020's, has potential requirements to transfer electric power up to 50-kW across the lunar surface from 0.1 to 10-km distances. This power would be used to operate surface payloads located remotely from the outpost and/or outpost primary power grid. This paper describes concept designs for state-of-the-art technology power transfer subsystems including AC or DC power via cables, beamed radio frequency power and beamed laser power. Power transfer subsystem mass and performance are calculated and compared for each option. A simplified qualitative assessment of option operations, hazards, costs and technology needs is also described. Based on these concept designs and performance analyses, a DC power cabling subsystem is recommended to minimize subsystem mass and to minimize mission and programmatic costs and risks. Avenues for additional power transfer subsystem studies are recommended.

  10. Optimization of wastewater treatment alternative selection by hierarchy grey relational analysis.

    PubMed

    Zeng, Guangming; Jiang, Ru; Huang, Guohe; Xu, Min; Li, Jianbing

    2007-01-01

    This paper describes an innovative systematic approach, namely hierarchy grey relational analysis for optimal selection of wastewater treatment alternatives, based on the application of analytic hierarchy process (AHP) and grey relational analysis (GRA). It can be applied for complicated multicriteria decision-making to obtain scientific and reasonable results. The effectiveness of this approach was verified through a real case study. Four wastewater treatment alternatives (A(2)/O, triple oxidation ditch, anaerobic single oxidation ditch and SBR) were evaluated and compared against multiple economic, technical and administrative performance criteria, including capital cost, operation and maintenance (O and M) cost, land area, removal of nitrogenous and phosphorous pollutants, sludge disposal effect, stability of plant operation, maturity of technology and professional skills required for O and M. The result illustrated that the anaerobic single oxidation ditch was the optimal scheme and would obtain the maximum general benefits for the wastewater treatment plant to be constructed.

  11. Low cost silicon solar array project silicon materials task: Establishment of the feasibility of a process capable of low-cost, high volume production of silane (step 1) and the pyrolysis of silane to semiconductor-grade silicon (step 2)

    NASA Technical Reports Server (NTRS)

    Breneman, W. C.; Cheung, H.; Farrier, E. G.; Morihara, H.

    1977-01-01

    A quartz fluid bed reactor capable of operating at temperatures of up to 1000 C was designed, constructed, and successfully operated. During a 30 minute experiment, silane was decomposed within the reactor with no pyrolysis occurring on the reactor wall or on the gas injection system. A hammer mill/roller-crusher system appeared to be the most practical method for producing seed material from bulk silicon. No measurable impurities were detected in the silicon powder produced by the free space reactor, using the cathode layer emission spectroscopic technique. Impurity concentration followed by emission spectroscopic examination of the residue indicated a total impurity level of 2 micrograms/gram. A pellet cast from this powder had an electrical resistivity of 35 to 45 ohm-cm and P-type conductivity.

  12. Environment-friendly drilling operation technology

    NASA Astrophysics Data System (ADS)

    Luo, Huaidong; Jing, Ning; Zhang, Yanna; Huang, Hongjun; Wei, Jun

    2017-01-01

    Under the circumstance that international safety and environmental standards being more and more stringent, drilling engineering is facing unprecedented challenges, the extensive traditional process flow is no longer accepted, the new safe and environment-friendly process is more suitable to the healthy development of the industry. In 2015, CNPCIC adopted environment-friendly drilling technology for the first time in the Chad region, ensured the safety of well control, at the same time increased the environmental protection measure, reduced the risk of environmental pollution what obtain the ratification from local government. This technology carries out recovery and disposal of crude oil, cuttings and mud without falling on the ground. The final products are used in road and well site construction, which realizes the reutilization of drilling waste, reduces the operating cost, and provides a strong technical support for cost-cutting and performance-increase of drilling engineering under low oil price.

  13. Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272

    DOT National Transportation Integrated Search

    2009-12-22

    One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...

  14. Design and Implementation of an Intelligent Cost Estimation Model for Decision Support System Software

    DTIC Science & Technology

    1990-09-01

    following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W

  15. Cost estimators for construction of forest roads in the central Appalachians

    Treesearch

    Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler

    1992-01-01

    Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...

  16. The Economics of IRIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, K.; Paramonov, D.

    2002-07-01

    IRIS (International Reactor Innovative and Secure) is a small to medium advanced light water cooled modular reactor being developed by an international consortium led by Westinghouse/BNFL. This reactor design is specifically aimed at utilities looking to install new (or replacement) nuclear capacity to match market demands, or at developing countries for their distributed power needs. To determine the optimal configuration for IRIS, analysis was undertaken to establish Generation Costs ($/MWh) and Internal Rate of Return (IRR %) to the Utility at alternative power ratings. This was then combined with global market projections for electricity demand out to 2030, segmented intomore » key geographical regions. Finally this information is brought together to form insights, conclusions and recommendations regarding the optimal design. The resultant analysis reveals a single module sized at 335 MWe, with a construction period of 3 years and a 60-year plant life. Individual modules can be installed in a staggered fashion (3 equivalent to 1005 MWe) or built in pairs (2 sets of twin units' equivalent to 1340 MWe). Uncertainty in Market Clearing Price for electricity, Annual Operating Costs and Construction Costs primarily influence lifetime Net Present Values (NPV) and hence IRR % for Utilities. Generation Costs in addition are also influenced by Fuel Costs, Plant Output, Plant Availability and Plant Capacity Factor. Therefore for a site based on 3 single modules, located in North America, Generations Costs of 28.5 $/MWh are required to achieve an IRR of 20%, a level which enables IRIS to compete with all other forms of electricity production. Plant size is critical to commercial success. Sustained (lifetime) high factors for Plant Output, Availability and Capacity Factor are required to achieve a competitive advantage. Modularity offers Utilities the option to match their investments with market conditions, adding additional capacity as and when the circumstances are right. Construction schedule needs to be controlled. There is a clear trade-off between reducing financing charges and optimising revenue streams. (authors)« less

  17. Anaerobic co-digestion of dairy manure and potato waste

    NASA Astrophysics Data System (ADS)

    Yadanaparthi, Sai Krishna Reddy

    Dairy and potato are two important agricultural commodities in Idaho. Both the dairy and potato processing industries produce a huge amount of waste which could cause environmental pollution. To minimize the impact of potential pollution associated with dairy manure (DM) and potato waste (PW), anaerobic co-digestion has been considered as one of the best treatment process. The purpose of this research is to evaluate the anaerobic co-digestion of dairy manure and potato waste in terms of process stability, biogas generation, construction and operating costs, and potential revenue. For this purpose, I conducted 1) a literature review, 2) a lab study on anaerobic co-digestion of dairy manure and potato waste at three different temperature ranges (ambient (20-25°C), mesophilic (35-37°C) and thermophilic (55-57°C) with five mixing ratios (DM:PW-100:0, 90:10, 80:20, 60:40, 40:60), and 3) a financial analysis for anaerobic digesters based on assumed different capital costs and the results from the lab co-digestion study. The literature review indicates that several types of organic waste were co-digested with DM. Dairy manure is a suitable base matter for the co-digestion process in terms of digestion process stability and methane (CH4) production (Chapter 2). The lab tests showed that co-digestion of DM with PW was better than digestion of DM alone in terms of biogas and CH4 productions (Chapter 3). The financial analysis reveals DM and PW can be used as substrate for full size anaerobic digesters to generate positive cash flow within a ten year time period. Based on this research, the following conclusions and recommendations were made: ▸ The ratio of DM:PW-80:20 is recommended at thermophilic temperatures and the ratio of DM:PW-90:10 was recommended at mesophilic temperatures for optimum biogas and CH4 productions. ▸ In cases of anaerobic digesters operated with electricity generation equipment (generators), low cost plug flow digesters (capital cost of 600/cow) operating at thermophilic temperatures are recommended. • The ratio of DM:PW-90:10 or 80:20 is recommended while operating low cost plug flow digesters at thermophilic temperatures. ▸ In cases of anaerobic digesters operated without electricity generation equipment (generators), completely mixed or high or low cost plug flow digesters can be used. • The ratio of DM:PW-80:20 is recommended for completely mixed digesters operated at thermophilic temperatures; • The ratio of DM:PW-90:10 or 80:20 is recommended for high cost plug flow digesters (capital cost of 1,000/cow) operated at thermophilic temperatures; • All of the four co-digested mixing ratios (i.e. DM:PW-90:10 or 80:20 or 60:40 or 40:60) are good for low cost plug flow digesters (capital cost of $600/cow) operated at thermophilic temperatures. The ratio of DM:PW-90:10 is recommended for positive cash flow within the ten year period if the low cost plug flow digesters are operated at mesophilic temperatures.

  18. Synthetic building materials for transport buildings and structures

    NASA Astrophysics Data System (ADS)

    Gerasimova, Vera

    2017-10-01

    The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.

  19. Flexible and low-voltage integrated circuits constructed from high-performance nanocrystal transistors.

    PubMed

    Kim, David K; Lai, Yuming; Diroll, Benjamin T; Murray, Christopher B; Kagan, Cherie R

    2012-01-01

    Colloidal semiconductor nanocrystals are emerging as a new class of solution-processable materials for low-cost, flexible, thin-film electronics. Although these colloidal inks have been shown to form single, thin-film field-effect transistors with impressive characteristics, the use of multiple high-performance nanocrystal field-effect transistors in large-area integrated circuits has not been shown. This is needed to understand and demonstrate the applicability of these discrete nanocrystal field-effect transistors for advanced electronic technologies. Here we report solution-deposited nanocrystal integrated circuits, showing nanocrystal integrated circuit inverters, amplifiers and ring oscillators, constructed from high-performance, low-voltage, low-hysteresis CdSe nanocrystal field-effect transistors with electron mobilities of up to 22 cm(2) V(-1) s(-1), current modulation >10(6) and subthreshold swing of 0.28 V dec(-1). We fabricated the nanocrystal field-effect transistors and nanocrystal integrated circuits from colloidal inks on flexible plastic substrates and scaled the devices to operate at low voltages. We demonstrate that colloidal nanocrystal field-effect transistors can be used as building blocks to construct complex integrated circuits, promising a viable material for low-cost, flexible, large-area electronics.

  20. Monitoring spatial and temporal variations of permeability in constructed wetlands by time-lapse geophysical methods

    NASA Astrophysics Data System (ADS)

    Tapias, J. C.; Himi, M.; Lovera, R.; Blasco, R.; Folch, M.; Casas, A.

    2012-04-01

    Constructed wetlands are widely used for removing pollutants from wastewater in small communities because their simplicity and low operation costs. Nevertheless, with time the cleaning process can result in gradual clogging of the porous layer by suspended solids, bacterial film, chemical precipitates and compactation. The clogging development causes decrease of hydraulic conductivity, reduced oxygen supply and further leads to a rapid decrease of the treatment performance. As the investment involved in reversing clogging can represent a substantial fraction of the cost of a new system it is essential to assess in advance the evolution of clogging process and detect potential failures in the system. Since there is a lack of experiences for monitoring the functionality of constructed wedlands a combination of non-destructive geophysical methods have been tested in this study. With this purpose electrical resistivity tomography, induced polarisation, frequency domain EM and ground probing radar have been conducted at different horizontal subsurface flow municipal wastewater treatment wetlands of Catalonia (Spain). The obtained results have shown that the applied geophysical techniques may delineate the clogging expansion and help take the preventive measures for enlarge the lifetime of the treatment system.

  1. CONSTRUCTION AND VALIDATION OF LOW COST LAPAROSCOPIC SIMULATOR USING ANDROID SMARTPHONE AND POP CAST AND A LAPTOP.

    PubMed

    Vyas, A; Goel, G

    2017-09-01

    Minimal invasive surgery training requires a lot of practice and for this purpose innovative tools are needed to develop methods for practice and training skills outside the operating room. Commercially available devices are readily available but cost effectiveness and availability are major limiting factors in resource limited setting. We present an innovative and cost effective laparoscopic simulator which can be easily manufactured and used for practice of laparoscopic surgery. Using a free android application, such as IP webcam we can relay video to laptop without the use of any cables and uniquely we use the flash of a camera as the light source and a selfie stick for movement of the camera. Use of this type of setup can help to reduce cost of simulated learning in low income countries and makes laparoscopic training facilities readily available. Copyright© Authors.

  2. A Simple, Low-Cost Platform for Real-Time Isothermal Nucleic Acid Amplification

    PubMed Central

    Craw, Pascal; Mackay, Ruth E.; Naveenathayalan, Angel; Hudson, Chris; Branavan, Manoharanehru; Sadiq, S. Tariq; Balachandran, Wamadeva

    2015-01-01

    Advances in microfluidics and the introduction of isothermal nucleic acid amplification assays have resulted in a range of solutions for nucleic acid amplification tests suited for point of care and field use. However, miniaturisation of instrumentation for such assays has not seen such rapid advances and fluorescence based assays still depend on complex, bulky and expensive optics such as fluorescence microscopes, photomultiplier tubes and sensitive lens assemblies. In this work we demonstrate a robust, low cost platform for isothermal nucleic acid amplification on a microfluidic device. Using easily obtainable materials and commercial off-the-shelf components, we show real time fluorescence detection using a low cost photodiode and operational amplifier without need for lenses. Temperature regulation on the device is achieved using a heater fabricated with standard printed circuit board fabrication methods. These facile construction methods allow fabrications at a cost compatible with widespread deployment to resource poor settings. PMID:26389913

  3. Solar Heating And Cooling Of Buildings (SHACOB): Requirements definition and impact analysis-2. Volume 1: Energy-conserving design for residential structures

    NASA Astrophysics Data System (ADS)

    Cretcher, C. K.

    1980-11-01

    The impact of stringent energy conserving building standards on electric utility service areas and their customers was analyzed. The demands on the seven broadly representative electric utilities were aggregated to represent the total new construction electric heating demands in the years 1990 and 2000 to be compared to the aggregate obtained similarly for a nominal, less stringent standard, viz., ASHRAE 90-75. Results presented include the percentage of energy savings achieved in both heating and cooling seasons and typical demand profile changes. A utility economic impact analysis was performed for the cases investigated to determine changes in operating costs and potential capacity sales. A third cost component considered is the incremental cost of superinsulation (over ASHRAE 90-75) to the customer. The aggregate net cost to the utility/customer entity is utilized as a measure of overall economic benefit.

  4. Bioreactor performance: a more scientific approach for practice.

    PubMed

    Lübbert, A; Bay Jørgensen, S

    2001-02-13

    In practice, the performance of a biochemical conversion process, i.e. the bioreactor performance, is essentially determined by the benefit/cost ratio. The benefit is generally defined in terms of the amount of the desired product produced and its market price. Cost reduction is the major objective in biochemical engineering. There are two essential engineering approaches to minimizing the cost of creating a particular product in an existing plant. One is to find a control path or operational procedure that optimally uses the dynamics of the process and copes with the many constraints restricting production. The other is to remove or lower the constraints by constructive improvements of the equipment and/or the microorganisms. This paper focuses on the first approach, dealing with optimization of the operational procedure and the measures by which one can ensure that the process adheres to the predetermined path. In practice, feedforward control is the predominant control mode applied. However, as it is frequently inadequate for optimal performance, feedback control may also be employed. Relevant aspects of such performance optimization are discussed.

  5. A fixed tilt solar collector employing reversible vee-trough reflectors and vacuum tube receivers for solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    Selcuk, M. K.

    1977-01-01

    The usefulness of vee-trough concentrators in improving the efficiency and reducing the cost of collectors assembled from evacuated tube receivers was studied in the vee-trough/vacuum tube collector (VTVTC) project. The VTVTC was analyzed rigorously and various mathematical models were developed to calculate the optical performance of the vee-trough concentrator and the thermal performance of the evacuated tube receiver. A test bed was constructed to verify the mathematical analyses and compare reflectors made out of glass, Alzak and aluminized FEP Teflon. Tests were run at temperatures ranging from 95 to 180 C. Vee-trough collector efficiencies of 35 to 40% were observed at an operating temperature of about 175 C. Test results compared well with the calculated values. Predicted daily useful heat collection and efficiency values are presented for a year's duration of operation temperatures ranging from 65 to 230 C. Estimated collector costs and resulting thermal energy costs are presented. Analytical and experimental results are discussed along with a complete economic evaluation.

  6. URSA MAIOR: a One Liter Nanosatellite Bus for Low Cost Access to Space

    NASA Astrophysics Data System (ADS)

    Santoni, F.

    One of the main limitations in the access to space for developing countries is the economical effort typically required by space missions. Secondly, space activity is a field of very high technology, requiring technical skills, education and practice, at a level which is seldom reached by developing countries. Interventions aimed to facilitate access to space for developing countries should be focussed primarily on the missions allowing access to space at reasonable cost. Moreover, perhaps more importantly, they should emphasize conducting the mission design, construction, ground testing and operation in orbit as an open activity, accessible to developing countries personnel, in order to set up an education process, which is not just selling a product ready satellite. Universities could have a very important role in this activity. Many Universities around the world have designed, built and launched small satellites. Università di Roma "La Sapienza" set up a program for the construction of small satellites in an academic environment, involving directly the students in the design, construction, ground testing and operation in orbit. The first satellite built in the framework of this program, UNISAT, was successfully launched in September 2000. The second, UNISAT-2, initially scheduled for launch in 2001, has been delayed by the launch provider to late 2002. These two satellites, based on a modular design, emphasizing ease of construction and assembly, weight roughly 10 kg. The realization of these satellites was made possible within the regular financing given to university research programs, keeping down cost by the use of commercial off the shelf components instead of space rated ones. The microsatellite experience at Università di Roma "La Sapienza", is going further with the development of a new nanosatellite bus, URSA MAIOR (Università di Roma "la SApienza" Micro Autonomous Imager in ORbit), aiming at cutting down cost and possibly improving performance. The whole satellite has a volume of one liter and a target weight of one kilogram. It can support small scientific missions, such as Earth imaging, and, potentially, small communications payloads. All the on-board components are commercial off the shelf, including solar panels, completely assembled in the University laboratories. Commercial Li-Ion batteries are the energy storage device. Three axis attitude stabilization is provided by a bias momentum wheel, with magnetic coils for active nutation damping and pointing control. Academic personnel and students are involved in the whole process of the nanosatellite design, construction and ground test. All the phases of the projects are open to the participation of the students, contributing ideas and solution to the technical problems, under the supervision of the academic staff. All the subsystems and components are designed to be assembled in a normally equipped electronics laboratory, without any potentially harmful materials or operations. For example the Li-Ion battery pack have been assembled following a procedure, primarily focussed on ease of integration and assembly by not experienced people, such as students, in a normally equipped University electronics laboratory. Packing materials were selected with no special requirements in terms of toxicity control, potential harmful operations, environmental cleanliness, or expensive curing machines. The space education experience made at Università di Roam "La Sapienza", with all the phases of the space program opened to students, realizing small satellites with small economical budgets seems to be a useful tool to give access to space to developing countries. These could have a piece of hardware in space at reachable costs, realizing small earth imaging or communication missions, and at the same time could obtain space education through hands-on experience, filling, at least in part, the technological gap. The paper describes the nanosatellite bus URSA MAIOR in some detail, showing how it could be exploited as useful tool to give developing countries access to space, as well as space education.

  7. Evaluation of Needle Gun and Abrasive Blasting Technologies in Bridge Paint Removal Practices.

    PubMed

    Randall, Paul M; Kranz, Paul B; Sonntag, Mary L; Stadelmaier, James E

    1998-03-01

    This paper reviews the results of a U.S. Environmental Protection Agency (EPA) study that assessed needle gun technology as an alternative to conventional abrasive blasting technology to remove lead-based paint from steel bridges in western New York State. The study analyzed the operational and logistical aspects as they relate to worker health and safety, environmental protection, hazardous waste generation, and costs as compared to those arising from conventional abrasive blasting. In this 1992 EPA study, the costs and the product quality aspects favored conventional abrasive blasting over the needle gun technology for removing lead paint. However, abrasive blasting exposed workers to airborne lead levels that exceeded Permissible Exposure Limits (PELs) as established by the Occupational Safety and Health Administration (OSHA), as well as emitting high levels of lead-contaminated dusts and debris into the environment. It was estimated that more than 500 lbs of lead-contaminated spent abrasives and paint waste were released into the environment during paint removal operations. The needle gun system reduced (up to 97.5%) the generation of hazardous waste and the airborne concentrations (up to 99%) of respirable dusts and lead-containing particulates generated during paint removal operations. However, labor costs for the needle gun were three times higher than those for abrasive blasting primarily because of slower production rates that necessitated more operating personnel. The higher labor costs of the needle gun are partially offset by the increased costs associated with the expendable abrasive blast media and hazardous waste disposal. In the EPA study, the productivity of the needle gun system was 12.2 ft 2 /hr vs. 147.5 ft 2 /hr for abrasive blasting. A post blast was needed for the needle gun system to meet surface preparation specifications. When factoring in the costs of full containment structures to meet OSHA's 1993 Lead Exposure in Construction regulation, the needle gun system has the potential to be economically competitive with conventional abrasive blasting.

  8. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.« less

  9. FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenison, LaVesta; Flanigan, Thomas; Hagerty, Gregg

    The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integratedmore » in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.« less

  10. Commercial launch systems: A risky investment?

    NASA Astrophysics Data System (ADS)

    Dupnick, Edwin; Skratt, John

    1996-03-01

    A myriad of evolutionary paths connect the current state of government-dominated space launch operations to true commercial access to space. Every potential path requires the investment of private capital sufficient to fund the commercial venture with a perceived risk/return ratio acceptable to the investors. What is the private sector willing to invest? Does government participation reduce financial risk? How viable is a commercial launch system without government participation and support? We examine the interplay between various forms of government participation in commercial launch system development, alternative launch system designs, life cycle cost estimates, and typical industry risk aversion levels. The boundaries of this n-dimensional envelope are examined with an ECON-developed business financial model which provides for the parametric assessment and interaction of SSTO design variables (including various operational scenarios with financial variables including debt/equity assumptions, and commercial enterprise burden rates on various functions. We overlay this structure with observations from previous ECON research which characterize financial risk aversion levels for selected industrial sectors in terms of acceptable initial lump-sum investments, cumulative investments, probability of failure, payback periods, and ROI. The financial model allows the construction of parametric tradeoffs based on ranges of variables which can be said to actually encompass the ``true'' cost of operations and determine what level of ``true'' costs can be tolerated by private capitalization.

  11. Feasibility of atmospheric methane removal using methanotrophic biotrickling filters.

    PubMed

    Yoon, Sukhwan; Carey, Jeffrey N; Semrau, Jeremy D

    2009-07-01

    Methane is a potent greenhouse gas with a global warming potential ~23 times that of carbon dioxide. Here, we describe the modeling of a biotrickling filtration system composed of methane-consuming bacteria, i.e., methanotrophs, to assess the utility of these systems in removing methane from the atmosphere. Model results indicate that assuming the global average atmospheric concentration of methane, 1.7 ppmv, methane removal is ineffective using these methanotrophic biofilters as the methane concentration is too low to enable cell survival. If the concentration is increased to 500-6,000 ppmv, however, similar to that found above landfills and in concentrated animal feeding operations (factory farms), 4.98-35.7 tons of methane can be removed per biofilter per year assuming biotrickling filters of typical size (3.66 m in diameter and 11.5 m in height). Using reported ranges of capital, operational, and maintenance costs, the cost of the equivalent ton of CO(2) removal using these systems is $90-$910 ($2,070-$20,900 per ton of methane), depending on the influent concentration of methane and if heating is required. The use of methanotrophic biofilters for controlling methane emissions is technically feasible and, provided that either the costs of biofilter construction and operation are reduced or the value of CO(2) credits is increased, can also be economically attractive.

  12. Reserve valuation in electric power systems

    NASA Astrophysics Data System (ADS)

    Ruiz, Pablo Ariel

    Operational reliability is provided in part by scheduling capacity in excess of the load forecast. This reserve capacity balances the uncertain power demand with the supply in real time and provides for equipment outages. Traditionally, reserve scheduling has been ensured by enforcing reserve requirements in the operations planning. An alternate approach is to employ a stochastic formulation, which allows the explicit modeling of the sources of uncertainty. This thesis compares stochastic and reserve methods and evaluates the benefits of a combined approach for the efficient management of uncertainty in the unit commitment problem. Numerical studies show that the unit commitment solutions obtained for the combined approach are robust and superior with respect to the traditional approach. These robust solutions are especially valuable in areas with a high proportion of wind power, as their built-in flexibility allows the dispatch of practically all the available wind power while minimizing the costs of operation. The scheduled reserve has an economic value since it reduces the outage costs. In several electricity markets, reserve demand functions have been implemented to take into account the value of reserve in the market clearing process. These often take the form of a step-down function at the reserve requirement level, and as such they may not appropriately represent the reserve value. The value of reserve is impacted by the reliability, dynamic and stochastic characteristics of system components, the system operation policies, and the economic aspects such as the risk preferences of the demand. In this thesis, these aspects are taken into account to approximate the reserve value and construct reserve demand functions. Illustrative examples show that the demand functions constructed have similarities with those implemented in some markets.

  13. Treatment of table olive washing water using trickling filters, constructed wetlands and electrooxidation.

    PubMed

    Tatoulis, Triantafyllos; Stefanakis, Alexandros; Frontistis, Zacharias; Akratos, Christos S; Tekerlekopoulou, Athanasia G; Mantzavinos, Dionissios; Vayenas, Dimitrios V

    2017-01-01

    The production of table olives is a significant economic activity in Mediterranean countries. Table olive processing generates large volumes of rinsing water that are characterized by high organic matter and phenol contents. Due to these characteristics, a combination of more than one technology is imperative to ensure efficient treatment with low operational cost. Previously, biological filters were combined with electrooxidation to treat table olive washing water. Although this combination was successful in reducing pollutant loads, its cost could be further reduced. Constructed wetlands could be an eligible treatment method for integrated table olive washing water treatment as they have proved tolerant to high organic matter and phenol loads. Two pilot-scale horizontal subsurface constructed wetlands, one planted and one unplanted, were combined with a biological filter and electrooxidation over a boron-doped diamond anode to treat table olive washing water. In the biological filter inlet, chemical oxygen demand (COD) concentrations ranged from 5500 to 15,000 mg/L, while mean COD influent concentration in the constructed wetlands was 2800 mg/L. The wetlands proved to be an efficient intermediate treatment stage, since COD removal levels for the planted unit reached 99 % (mean 70 %), while the unplanted unit presented removal rates of around 65 %. Moreover, the concentration of phenols in the effluent was typically below 100 mg/L. The integrated trickling filter-constructed wetland-electrooxidation treatment system examined here could mineralize and decolorize table olive washing water and fully remove its phenolic content.

  14. Modified symplectic schemes with nearly-analytic discrete operators for acoustic wave simulations

    NASA Astrophysics Data System (ADS)

    Liu, Shaolin; Yang, Dinghui; Lang, Chao; Wang, Wenshuai; Pan, Zhide

    2017-04-01

    Using a structure-preserving algorithm significantly increases the computational efficiency of solving wave equations. However, only a few explicit symplectic schemes are available in the literature, and the capabilities of these symplectic schemes have not been sufficiently exploited. Here, we propose a modified strategy to construct explicit symplectic schemes for time advance. The acoustic wave equation is transformed into a Hamiltonian system. The classical symplectic partitioned Runge-Kutta (PRK) method is used for the temporal discretization. Additional spatial differential terms are added to the PRK schemes to form the modified symplectic methods and then two modified time-advancing symplectic methods with all of positive symplectic coefficients are then constructed. The spatial differential operators are approximated by nearly-analytic discrete (NAD) operators, and we call the fully discretized scheme modified symplectic nearly analytic discrete (MSNAD) method. Theoretical analyses show that the MSNAD methods exhibit less numerical dispersion and higher stability limits than conventional methods. Three numerical experiments are conducted to verify the advantages of the MSNAD methods, such as their numerical accuracy, computational cost, stability, and long-term calculation capability.

  15. A stochastic discrete optimization model for designing container terminal facilities

    NASA Astrophysics Data System (ADS)

    Zukhruf, Febri; Frazila, Russ Bona; Burhani, Jzolanda Tsavalista

    2017-11-01

    As uncertainty essentially affect the total transportation cost, it remains important in the container terminal that incorporates several modes and transshipments process. This paper then presents a stochastic discrete optimization model for designing the container terminal, which involves the decision of facilities improvement action. The container terminal operation model is constructed by accounting the variation of demand and facilities performance. In addition, for illustrating the conflicting issue that practically raises in the terminal operation, the model also takes into account the possible increment delay of facilities due to the increasing number of equipment, especially the container truck. Those variations expectantly reflect the uncertainty issue in the container terminal operation. A Monte Carlo simulation is invoked to propagate the variations by following the observed distribution. The problem is constructed within the framework of the combinatorial optimization problem for investigating the optimal decision of facilities improvement. A new variant of glow-worm swarm optimization (GSO) is thus proposed for solving the optimization, which is rarely explored in the transportation field. The model applicability is tested by considering the actual characteristics of the container terminal.

  16. Solar project description for environmental partnership, Upper Freehold Township, Monmouth County, New Jersey

    NASA Astrophysics Data System (ADS)

    1982-08-01

    A solar house is described. It is a three-story single family detached residence in New Jersey. It is equipped with a 540 cubic foot vented Trombe wall constructed of concrete filled concrete blocks and glazed with 344 square feet of insulated tempered glass. Heat is also provided by a 168 square foot sunspace of insulated glass. In the loft area is a phase change storage system composed of 32 PSI Thermal-81 phase change storage rods. Auxiliary heating is y a wood-burning stove and a dual-fuel, propane and wood, forced air furnace. A breadbox type hot water preheater is located on the roof. Summer cooling is accomplished by opening windows, doors, and exhaust dampers and operating a whole house ventilation fan. Operation of the solar system and the auxiliary subsystems may involve one or more of 5 modes: collector-to-storage, storage-to-space heating, auxiliary-to-space heating, energy-to-load-summer cooling, and domestic hot water. The house, its solar heating systems, storage, load, operation, on-site performance evaluation instrumentation, and data depicting the solar portion of construction costs are outlined.

  17. Mine Planning for Asteroid Orebodies

    NASA Astrophysics Data System (ADS)

    Gertsch, L. S.; Gertsch, R. E.

    2000-01-01

    Given that an asteroid (or comet) has been determined to contain sufficient material of value to be potentially economic to exploit, a mining method must be selected and implemented. This paper discusses the engineering necessary to bring a mine online, and the opportunities and challenges inherent in asteroid mineral prospects. The very important step of orebody characterization is discussed elsewhere. The mining methods discussed here are based on enclosing the asteroid within a bag in some fashion, whether completely or partially. In general, asteroid mining methods based on bags will consist of the following steps. Not all will be required in every case, nor necessarily in this particular sequence. Some steps will be performed simultaneously. Their purpose is to extract the valuable material from the body of the asteroid in the most efficient, cost-effective manner possible. In approximate order of initiation, if not of conclusion, the steps are: 1. Tether anchoring to the asteroid. 2. Asteroid motion control. 3. Body/fragment restraint system placement. 4. Operations platform construction. 5. Bag construction. 6. Auxiliary and support equipment placement. 7. Mining operations. 8. Processing operations. 9. Product transport to markets.

  18. Too expensive to meter: the influence of transaction costs in transportation and communication.

    PubMed

    Levinson, David; Odlyzko, Andrew

    2008-06-13

    Technology appears to be making fine-scale charging (as in tolls on roads that depend on time of day or even on current and anticipated levels of congestion) increasingly feasible. Such charging also appears to be increasingly desirable, as traffic on roads continues to grow and costs and public opposition limit new construction. Similar incentives towards fine-scale charging also appear to be operating in communications and other areas, such as electricity usage. Standard economic theory supports such measures and technology is being developed and deployed to implement them. But their spread is not very rapid and their prospects for the future are uncertain. This paper presents a collection of sketches, ranging from ancient history to very recent developments, that illustrate the costs that charging imposes. Some of those costs are explicit (in terms of the monetary costs to users and the costs of implementing the charging mechanisms). Others are implicit, such as the time or the mental processing costs of users. These argue that the case for fine-scale charging is not unambiguous and that in many cases such charging may lead to undesirable outcomes.

  19. Human-robot interaction modeling and simulation of supervisory control and situational awareness during field experimentation with military manned and unmanned ground vehicles

    NASA Astrophysics Data System (ADS)

    Johnson, Tony; Metcalfe, Jason; Brewster, Benjamin; Manteuffel, Christopher; Jaswa, Matthew; Tierney, Terrance

    2010-04-01

    The proliferation of intelligent systems in today's military demands increased focus on the optimization of human-robot interactions. Traditional studies in this domain involve large-scale field tests that require humans to operate semiautomated systems under varying conditions within military-relevant scenarios. However, provided that adequate constraints are employed, modeling and simulation can be a cost-effective alternative and supplement. The current presentation discusses a simulation effort that was executed in parallel with a field test with Soldiers operating military vehicles in an environment that represented key elements of the true operational context. In this study, "constructive" human operators were designed to represent average Soldiers executing supervisory control over an intelligent ground system. The constructive Soldiers were simulated performing the same tasks as those performed by real Soldiers during a directly analogous field test. Exercising the models in a high-fidelity virtual environment provided predictive results that represented actual performance in certain aspects, such as situational awareness, but diverged in others. These findings largely reflected the quality of modeling assumptions used to design behaviors and the quality of information available on which to articulate principles of operation. Ultimately, predictive analyses partially supported expectations, with deficiencies explicable via Soldier surveys, experimenter observations, and previously-identified knowledge gaps.

  20. New Opportunities of Low-Cost Photogrammetry for Culture Heritage Preservation

    NASA Astrophysics Data System (ADS)

    Shults, R.

    2017-05-01

    In the paper, the questions of using the technologies of low-cost photogrammetry in combination with the additional capabilities of modern smartphones are considered. The research was carried out on the example of documenting the historical construction of the II World War - the Kiev Fortified Region. Brief historical information about the object of research is given. The possibilities of using modern smartphones as measuring instruments are considered. To get high-quality results, the camera of the smartphone was calibrated. The calibration results were used in the future to perform 3D modeling of defense facilities. Photographing of three defense structures in a different state: destroyed, partially destroyed and operating was carried out. Based on the results of photography using code targets, 3D object models were constructed. To verify the accuracy of the 3D modelling, control measurements of the lines between the code targets at the objects were performed. The obtained results are satisfying, and the technology considered in the paper can be recommended for use in performing archaeological and historical studies.

  1. Determining the market value of high-rise residential buildings based on evaluation of consumer properties

    NASA Astrophysics Data System (ADS)

    Kolobova, Svetlana

    2018-03-01

    As you know, high-rise construction is an indicator of the practical implementation of advanced innovative technologies in the construction industry of the country. High-rise building inevitably comes to the big cities, in connection with the shortage and value of land. The life cycle of any construction project, including high-rise buildings consists of chains: of engineering survey - design-construction-operation. In the process of operation of a tall building, decisions about major repairs or reconstruction of a building are made for decision-making on further use. This article describes methods of assessing the consumer quality of high-rise residential buildings and the establishment of prices based on consumer characteristics of a tall residential building. It is proposed to assess the premises under their quality characteristics. The study was conducted to establish the influence of individual, comprehensive and integral indicators of comparable quality for effective quality living spaces. Simultaneously, there was established a relationship of quality with the consumer cost of housing, ultimately with the potential needs of owners, tenants of the home, lessor dwelling, or buyers of residential properties and other participants in the residential real estate market. This relationship further creates consumer requirements to quality standard of premises at a certain stage of socio-economic development.

  2. Age in Relation to Worker Compensation Costs in the Construction Industry

    PubMed Central

    Schwatka, Natalie V.; Butler, Lesley M.; Rosecrance, John C.

    2015-01-01

    Background A better understanding of how workers’ compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. Methods The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Results Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18–24. Conclusions Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. PMID:22782837

  3. Age in relation to worker compensation costs in the construction industry.

    PubMed

    Schwatka, Natalie V; Butler, Lesley M; Rosecrance, John C

    2013-03-01

    A better understanding of how workers' compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18-24. Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. Copyright © 2012 Wiley Periodicals, Inc.

  4. 25 CFR 136.3 - Repayment of construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Repayment of construction costs. 136.3 Section 136.3 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.3 Repayment of construction costs. Under the terms of the contracts, the...

  5. Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].

    ERIC Educational Resources Information Center

    Geothermal Heat Pump Consortium, Inc., Washington, DC.

    A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)

  6. 48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...

  7. Life Comparative Analysis of Energy Consumption and CO2 Emissions of Different Building Structural Frame Types

    PubMed Central

    Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok

    2013-01-01

    The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO2 emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO2 emissions of input materials for each structural frame type. In addition, the CO2 emissions cost was measured using the trading price of CO2 emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO2 emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO2 emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future. PMID:24227998

  8. A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation

    PubMed Central

    Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869

  9. A cost-minimization analysis of tissue-engineered constructs for corneal endothelial transplantation.

    PubMed

    Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.

  10. A methodology for automation and robotics evaluation applied to the space station telerobotic servicer

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyanfi, Max; Volkmer, Kent; Zimmerman, Wayne

    1988-01-01

    The efforts of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems would involve a substitution of automation capabilities for human extravehicular or intravehicular activities (EVA, IVA). A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effect of operational constraints (space transportation system (STS), attached payload, and proximity operations). Changes in the region of cost-effectiveness are examined under a variety of systems design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: (1) as a research-oriented testbed to learn more about space usage of telerobotics; (2) as a research based testbed having an experimental demonstration orientation with limited assembly and servicing applications; or (3) as an operational system to augment EVA and to aid the construction of the Space Station and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations.

  11. KSC Construction Cost Index

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1983-01-01

    Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

  12. Intelligent electric vehicle charging: Rethinking the valley-fill

    NASA Astrophysics Data System (ADS)

    Valentine, Keenan; Temple, William G.; Zhang, K. Max

    This study proposes an intelligent PEV charging scheme that significantly reduces power system cost while maintaining reliability compared to the widely discussed valley-fill method of aggregated charging in the early morning. This study considers optimal PEV integration into the New York Independent System Operator's (NYISO) day-ahead and real-time wholesale energy markets for 21 days in June, July, and August of 2006, a record-setting summer for peak load. NYISO market and load data is used to develop a statistical Locational Marginal Price (LMP) and wholesale energy cost model. This model considers the high cost of ramping generators at peak-load and the traditional cost of steady-state operation, resulting in a framework with two competing cost objectives. Results show that intelligent charging assigns roughly 80% of PEV load to valley hours to take advantage of low steady-state cost, while placing the remaining 20% equally at shoulder and peak hours to reduce ramping cost. Compared to unregulated PEV charging, intelligent charging reduces system cost by 5-16%; a 4-9% improvement over the flat valley-fill approach. Moreover, a Charge Flexibility Constraint (CFC), independent of market modeling, is constructed from a vehicle-at-home profile and the mixture of Level 1 and Level 2 charging infrastructure. The CFC is found to severely restrict the ability to charge vehicles during the morning load valley. This study further shows that adding more Level 2 chargers without regulating PEV charging will significantly increase wholesale energy cost. Utilizing the proposed intelligent PEV charging method, there is a noticeable reduction in system cost if the penetration of Level 2 chargers is increased from 70/30 to 50/50 (Level 1/Level 2). However, the system benefit is drastically diminished for higher penetrations of Level 2 chargers.

  13. Using a Time-Driven Activity-Based Costing Model To Determine the Actual Cost of Services Provided by a Transgenic Core.

    PubMed

    Gerwin, Philip M; Norinsky, Rada M; Tolwani, Ravi J

    2018-03-01

    Laboratory animal programs and core laboratories often set service rates based on cost estimates. However, actual costs may be unknown, and service rates may not reflect the actual cost of services. Accurately evaluating the actual costs of services can be challenging and time-consuming. We used a time-driven activity-based costing (ABC) model to determine the cost of services provided by a resource laboratory at our institution. The time-driven approach is a more efficient approach to calculating costs than using a traditional ABC model. We calculated only 2 parameters: the time required to perform an activity and the unit cost of the activity based on employee cost. This method allowed us to rapidly and accurately calculate the actual cost of services provided, including microinjection of a DNA construct, microinjection of embryonic stem cells, embryo transfer, and in vitro fertilization. We successfully implemented a time-driven ABC model to evaluate the cost of these services and the capacity of labor used to deliver them. We determined how actual costs compared with current service rates. In addition, we determined that the labor supplied to conduct all services (10,645 min/wk) exceeded the practical labor capacity (8400 min/wk), indicating that the laboratory team was highly efficient and that additional labor capacity was needed to prevent overloading of the current team. Importantly, this time-driven ABC approach allowed us to establish a baseline model that can easily be updated to reflect operational changes or changes in labor costs. We demonstrated that a time-driven ABC model is a powerful management tool that can be applied to other core facilities as well as to entire animal programs, providing valuable information that can be used to set rates based on the actual cost of services and to improve operating efficiency.

  14. FBI fingerprint identification automation study. AIDS 3 evaluation report. Volume 4: Economic feasibility

    NASA Technical Reports Server (NTRS)

    Mulhall, B. D. L.

    1980-01-01

    The results of the economic analysis of the AIDS 3 system design are presented. AIDS 3 evaluated a set of economic feasibility measures including life cycle cost, implementation cost, annual operating expenditures and annual capital expenditures. The economic feasibility of AIDS 3 was determined by comparing the evaluated measures with the same measures, where applicable, evaluated for the current system. A set of future work load scenarios was constructed using JPL's environmental evaluation study of the fingerprint identification system. AIDS 3 and the current system were evaluated for each of the economic feasibility measures for each of the work load scenarios. They were compared for a set of performance measures, including response time and accuracy, and for a set of cost/benefit ratios, including cost per transaction and cost per technical search. Benefit measures related to the economic feasibility of the system are also presented, including the required number of employees and the required employee skill mix.

  15. Energy and Cost Savings of Retro-Commissioning and Retrofit Measures for Large Office Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Weimin; Zhang, Jian; Moser, Dave

    2012-08-03

    This paper evaluates the energy and cost savings of seven retro-commissioning measures and 29 retrofit measures applicable to most large office buildings. The baseline model is for a hypothetical building with characteristics of large office buildings constructed before 1980. Each retro-commissioning measure is evaluated against the original baseline in terms of its potential of energy and cost savings while each retrofit measure is evaluated against the commissioned building. All measures are evaluated in five locations (Miami, Las Vegas, Seattle, Chicago and Duluth) to understand the impact of weather conditions on energy and cost savings. The results show that implementation ofmore » the seven operation and maintenance measures as part of a retro-commissioning process can yield an average of about 22% of energy use reduction and 14% of energy cost reduction. Widening zone temperature deadband, lowering VAV terminal minimum air flow set points and lighting upgrades are effective retrofit measures to be considered.« less

  16. Analysis of the Energy Resources and Demand of Western Europe.

    DTIC Science & Technology

    1975-07-01

    possible for your organization. Please request NTIS-PR-205/PCW for more infor- mation. The weekly newsletter series will keep you current . But learn...to Optimistic View of U. K. Oil Position ^ * ’ Published in The Economist in May 1974 24 Rise of Drilling Costs in...North Sea aid * * Pipelines Under Construction or Operational A-23 Optimistic View of U.K. Oil Position , Published in The Economist in May 1974

  17. Air-Breathing Launch Vehicle Technology Being Developed

    NASA Technical Reports Server (NTRS)

    Trefny, Charles J.

    2003-01-01

    Of the technical factors that would contribute to lowering the cost of space access, reusability has high potential. The primary objective of the GTX program is to determine whether or not air-breathing propulsion can enable reusable single-stage-to-orbit (SSTO) operations. The approach is based on maturation of a reference vehicle design with focus on the integration and flight-weight construction of its air-breathing rocket-based combined-cycle (RBCC) propulsion system.

  18. Evaluation of Nontraditional Airfield Pavement Surfaces for Contingency Operations

    DTIC Science & Technology

    2014-01-01

    such as asphalt or portland cement concrete are not readily available or are too cost-, labor-, or equipment-intensive to use. This report presents a...courses) are generally constructed using hot mix asphalt (HMA) or portland cement concrete (PCC), both of which are suitable for C-17 and C-130...associated with PCC or HMA surfacing. Stabilization can be accomplished by blending additives such as portland cement , lime, fly ash, asphalt binder

  19. Environmental Assessment for Leasing Nellis Air Force Base Land for Construction and Operation of a Solar Photovoltaic System, Clark County, Nevada

    DTIC Science & Technology

    2006-08-01

    oxides OSHA Occupational Safety and Health Administration PL Public Law PM10 Particulate matter ≤ 10 microns in diameter POL Petroleum, oils , and...several years, costs and demand for energy produced through non- renewable resources, such as crude oil , have increased dramatically. In response to...flycatcher Empidonax difficilus Rough-winged swallow Stelgidopteryx serripennis Ruby-crowned kinglet Regulus calendula Northern mockingbird Mimus

  20. Low cost computer subsystem for the Solar Electric Propulsion Stage (SEPS)

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Solar Electric Propulsion Stage (SEPS) subsystem which consists of the computer, custom input/output (I/O) unit, and tape recorder for mass storage of telemetry data was studied. Computer software and interface requirements were developed along with computer and I/O unit design parameters. Redundancy implementation was emphasized. Reliability analysis was performed for the complete command computer sybsystem. A SEPS fault tolerant memory breadboard was constructed and its operation demonstrated.

  1. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

    DTIC Science & Technology

    2013-10-22

    states: The CVN 78 is experiencing cost growth due to “first of class” material availability (i.e., valves, actuators ), construction labor...assessment during IOT &E [initial operational test and evaluation]. • The current TEMP [test and evaluation master plan] does not adequately address...developmental testing significantly raises the likelihood of the discovery of platform-level problems during IOT &E. • The Navy plans to deliver CVN-78 in

  2. Application of Thermoelectric Devices to Fuel Cell Power Generation: Demonstration and Evaluation

    DTIC Science & Technology

    2004-09-01

    various forms of the ERDC/CERL TR-04-20 63 Rankine thermodynamic cycle (e.g., reheat, regeneration, supercritical). These central power plants can...placement of the TE Device in the condenser receiv- ing the low-quality steam exhaust or into the closed feedwater heaters used to preheat incoming...ability to more efficiently construct, operate, and maintain its installations and ensure environmental quality and safety at a reduced life- cycle -cost

  3. American Recovery and Reinvestment Act - Improper Planning of the Administrative Buildings Project at Camp Lejeune, Norlh Carolina

    DTIC Science & Technology

    2011-09-30

    the project was for “routine maintenance and repair and improvements to non-historic buildings and structures in the Camp Lejeune Complex...and cost overruns; and (5) program goals are achieved, including specific program outcomes and improved results on broader economic indicators. 1...Department of the Navy received approximately $1.2 billion in Recovery Act funds for Operations and Maintenance ; Military Construction; and Research

  4. State criminal justice telecommunications (STACOM). Volume 4: Network design software user's guide

    NASA Technical Reports Server (NTRS)

    Lee, J. J.

    1977-01-01

    A user's guide to the network design program is presented. The program is written in FORTRAN V and implemented on a UNIVAC 1108 computer under the EXEC-8 operating system which enables the user to construct least-cost network topologies for criminal justice digital telecommunications networks. A complete description of program features, inputs, processing logic, and outputs is presented, and a sample run and a program listing are included.

  5. Big Creek Flood Control Project, Cleveland, Ohio. Phase II. General Design Memorandum.

    DTIC Science & Technology

    1979-08-01

    enviromental measure to -minii polluted leachate, if say, from flowing down the embashment. 1. Comnt 12(a). The freboard on the chute will be revised...cost ratio); (3) operational dependability; and (4) socio -environmental effects, including external damage effects. Each of these alternative plans is...schedule for the utility relocations will not be in conflict with the construction schedule for the major components of the project outlined above. 112

  6. 23 CFR 140.907 - Overhead and indirect construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  7. End-to-end operations at the National Radio Astronomy Observatory

    NASA Astrophysics Data System (ADS)

    Radziwill, Nicole M.

    2008-07-01

    In 2006 NRAO launched a formal organization, the Office of End to End Operations (OEO), to broaden access to its instruments (VLA/EVLA, VLBA, GBT and ALMA) in the most cost-effective ways possible. The VLA, VLBA and GBT are mature instruments, and the EVLA and ALMA are currently under construction, which presents unique challenges for integrating software across the Observatory. This article 1) provides a survey of the new developments over the past year, and those planned for the next year, 2) describes the business model used to deliver many of these services, and 3) discusses the management models being applied to ensure continuous innovation in operations, while preserving the flexibility and autonomy of telescope software development groups.

  8. Design, construction, operation and costs of a modern small-scale fuel-alcohol plant

    NASA Astrophysics Data System (ADS)

    Leeper, S. A.; Dawley, L. J.; Wolfram, J. H.; Berglund, G. R.; Richardson, J. G.; McAtee, R. E.

    1982-01-01

    The design used for the small-scale fuel alcohol plant (SSFAP) is discussed. By incorporating a microprocessor into the plant design, most plant operations were automated and labor requirements were reduced. Continuous processing made energy conservation possible, thus reducing energy requirements. A low-temperature, continuous plug-flow cooker design made high yields possible. Ethanol was consistently produced at the SSFAP from corn at a yield of 2.6 gallons (anhydrous) per bushel and an energy requirement of 30,000 to 35,000 Btu/gallon (190-proof). In addition, barley, grain dust, and potato waste were converted at the SSFAP. The capacity of the SSFAP is 180,000 gallons per year (300 days operation). Competitively priced ethanol is produced at this capacity.

  9. Research on the performance evaluation of agricultural products supply chain integrated operation

    NASA Astrophysics Data System (ADS)

    Jiang, Jiake; Wang, Xifu; Liu, Yang

    2017-04-01

    The agricultural product supply chain integrated operation can ensure the quality and efficiency of agricultural products, and achieve the optimal goal of low cost and high service. This paper establishes a performance evaluation index system of agricultural products supply chain integration operation based on the development status of agricultural products and SCOR, BSC and KPI model. And then, we constructing rough set theory and BP neural network comprehensive evaluation model with the aid of Rosetta and MATLAB tools and the case study is about the development of agricultural products integrated supply chain in Jing-Jin-Ji region. And finally, we obtain the corresponding performance results, and give some improvement measures and management recommendations to the managers.

  10. The space station assembly phase: System design trade-offs for the flight telerobotic servicer

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyamfi, Max; Volkmer, Kent; Zimmerman, Wayne

    1988-01-01

    The effects of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems often involves a substitution of automation capabilities for human EVA or IVA activities. A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effects of operational constaints. Changes in the region of cost-effectiveness are examined under a variety of system design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: as a research-oriented test bed to learn more about space usage of telerobotics; as a research based test bed having an experimental demonstration orientation with limited assembly and servicing applications; or as an operational system to augment EVA and to aid construction of the Space Station and to reduce the program (schedule) risk by increasing the flexibility of mission operations.

  11. All-fiber wavelength swept ring laser based on Fabry-Perot filter for optical frequency domain imaging

    PubMed Central

    Jun, Changsu; Villiger, Martin; Oh, Wang-Yuhl; Bouma, Brett E.

    2014-01-01

    Innovations in laser engineering have yielded several novel configurations for high repetition rate, broad sweep range, and long coherence length wavelength swept lasers. Although these lasers have enabled high performance frequency-domain optical coherence tomography, they are typically complicated and costly and many require access to proprietary materials or devices. Here, we demonstrate a simplified ring resonator configuration that is straightforward to construct from readily available materials at a low total cost. It was enabled by an insight regarding the significance of isolation against bidirectional operation and by configuring the sweep range of the intracavity filter to exceed its free spectral range. The design can easily be optimized to meet a range of operating specifications while yielding robust and stable performance. As an example, we demonstrate 240 kHz operation with 125 nm sweep range and >70 mW of average output power and demonstrate high quality frequency domain OCT imaging. The complete component list and directions for assembly of the laser are posted on-line at www.octresearch.org. PMID:25401614

  12. Good feeling of living in the earth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolf, R.

    1978-12-01

    Underground houses combine energy savings and a comfortable lifestyle that leaves more land undisturbed and works with rather than against nature. Soil moderates and delays temperature fluctuations, leaving the heating system with a steady temperature that is much more efficient than the best insulated above-ground building. The combination of passive solar heating and underground construction suggests the possibility of an entirely new direction for future housing. Passive solar heating is appropriate because of the soil shield and the thermal mass provided by reinforced concrete. Both construction and operating costs are lower than conventional housing. Three styles: bermed, below grade, andmore » dug-in are available. Several sources of additional information are listed.« less

  13. Development of a novel micro pattern gaseous detector for cosmic ray muon tomography

    NASA Astrophysics Data System (ADS)

    Biglietti, M.; Canale, V.; Franchino, S.; Iengo, P.; Iodice, M.; Petrucci, F.

    2016-07-01

    We propose a novel detector (Thick Groove Detector, TGD) designed for cosmic ray tomography with a spatial resolution of 500 μm, trying to keep the construction procedure as simple as possible and to reduce the operating costs. The TGD belongs to the category of MPGDs with an amplification region less than 1 mm wide formed by alternate anode/cathode microstrips layers at different heights. A first 10×10 cm2 prototype has been built, divided in four sections with different test geometries. We present the construction procedure and the first results in terms of gain and stability. Preliminary studies with cosmic rays are also reported.

  14. Thermal infrared reference sources fabricated from low-cost components and materials

    NASA Astrophysics Data System (ADS)

    Hovland, Harald; Skauli, Torbjørn

    2018-04-01

    Mass markets, including mobile phones and automotive sensors, drive rapid developments of imaging technologies toward high performance, low cost sensors, even for the thermal infrared. Good infrared calibration blackbody sources have remained relatively costly, however. Here we demonstrate how to make low-cost reference sources, making quantitative infrared radiometry more accessible to a wider community. Our approach uses ordinary construction materials combined with low cost microcontrollers, digital temperature sensors and foil heater elements from massmarket 3D printers. Blackbodies are constructed from a foil heater of some chosen size and shape, attached to the back of a similarly shaped aluminum plate coated with commercial black paint, which normally exhibits high emissivity. The emissivity can be readily checked by using a thermal imager to view the reflection of a hot object. A digital temperature sensor is attached to the back of the plate. Thermal isolation of the backside minimizes temperature gradients through the plate, ensuring correct readings of the front temperature. The isolation also serves to minimize convection gradients and keeps power consumption low, which is useful for battery powered operation in the field. We demonstrate surface blackbodies (200x200 mm2) with surface homogeneities as low as 0.1°C at 100°C. Homogeneous heating and low thermal mass provides for fast settling time and setup/pack-down time. The approach is scalable to larger sizes by tiling, enabling portable and foldable square-meter-size or larger devices.

  15. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...

  16. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...

  17. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...

  18. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...

  19. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...

  20. Specifications for the First CSP Building System.

    ERIC Educational Resources Information Center

    Detroit Public Schools, MI.

    The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…

  1. 48 CFR 31.205-10 - Cost of money.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...

  2. 48 CFR 31.205-10 - Cost of money.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...

  3. 48 CFR 31.205-10 - Cost of money.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...

  4. 48 CFR 31.205-10 - Cost of money.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...

  5. 48 CFR 31.205-10 - Cost of money.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...

  6. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  7. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  8. Definition of technology development missions for early space stations: Large space structures

    NASA Technical Reports Server (NTRS)

    Gates, R. M.; Reid, G.

    1984-01-01

    The objectives studied are the definition of the tested role of an early Space Station for the construction of large space structures. This is accomplished by defining the LSS technology development missions (TDMs) identified in phase 1. Design and operations trade studies are used to identify the best structural concepts and procedures for each TDMs. Details of the TDM designs are then developed along with their operational requirements. Space Station resources required for each mission, both human and physical, are identified. The costs and development schedules for the TDMs provide an indication of the programs needed to develop these missions.

  9. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  10. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    NASA Astrophysics Data System (ADS)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  11. The cryogenic wind tunnel for high Reynolds number testing. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Kilgore, R. A.

    1974-01-01

    Experiments performed at the NASA Langley Research Center in a cryogenic low-speed continuous-flow tunnel and in a cryogenic transonic continuous-flow pressure tunnel have demonstrated the predicted changes in Reynolds number, drive power, and fan speed with temperature, while operating with nitrogen as the test gas. The experiments have also demonstrated that cooling to cryogenic temperatures by spraying liquid nitrogen directly into the tunnel circuit is practical and that tunnel temperature can be controlled within very close limits. Whereas most types of wind tunnel could operate with advantage at cryogenic temperatures, the continuous-flow fan-driven tunnel is particularly well suited to take full advantage of operating at these temperatures. A continuous-flow fan-driven cryogenic tunnel to satisfy current requirements for test Reynolds number can be constructed and operated using existing techniques. Both capital and operating costs appear acceptable.

  12. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    NASA Astrophysics Data System (ADS)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  13. Crossing the barrier between the laboratory working model and the practicable production model

    NASA Astrophysics Data System (ADS)

    Curby, William A.

    1992-12-01

    Transforming apparatus that has developed into a successfully working laboratory system into a system that is ready, or nearly ready for production, distribution and general use is not always accomplished in a cost effective or timely fashion. Several design elements must be considered interactively during the planning, construction, use and servicing of the final production form of the system. The basic design elements are: Operating Specifications, Reliability Factors, Safety Factors, Precision Limits, Accuracy Limits, Uniformity Factors, Cost Limits and Calibration Requirements. Secondary elements including: Human Engineering, Documentation, Training, Maintenance, Proprietary Rights, Protection, Marketing, Replacement of Parts, and Packing and Shipping must also be considered during the transition.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennink, Ryan S.; Ferragut, Erik M.; Humble, Travis S.

    Modeling and simulation are essential for predicting and verifying the behavior of fabricated quantum circuits, but existing simulation methods are either impractically costly or require an unrealistic simplification of error processes. In this paper, we present a method of simulating noisy Clifford circuits that is both accurate and practical in experimentally relevant regimes. In particular, the cost is weakly exponential in the size and the degree of non-Cliffordness of the circuit. Our approach is based on the construction of exact representations of quantum channels as quasiprobability distributions over stabilizer operations, which are then sampled, simulated, and weighted to yield unbiasedmore » statistical estimates of circuit outputs and other observables. As a demonstration of these techniques, we simulate a Steane [[7,1,3

  15. Conceptual Cost Estimating

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1983-01-01

    Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

  16. Evaluation of ways and procedures to reduce construction cost and increase competition.

    DOT National Transportation Integrated Search

    2009-01-01

    Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...

  17. Lunar Commercial Mining Logistics

    NASA Astrophysics Data System (ADS)

    Kistler, Walter P.; Citron, Bob; Taylor, Thomas C.

    2008-01-01

    Innovative commercial logistics is required for supporting lunar resource recovery operations and assisting larger consortiums in lunar mining, base operations, camp consumables and the future commercial sales of propellant over the next 50 years. To assist in lowering overall development costs, ``reuse'' innovation is suggested in reusing modified LTS in-space hardware for use on the moon's surface, developing product lines for recovered gases, regolith construction materials, surface logistics services, and other services as they evolve, (Kistler, Citron and Taylor, 2005) Surface logistics architecture is designed to have sustainable growth over 50 years, financed by private sector partners and capable of cargo transportation in both directions in support of lunar development and resource recovery development. The author's perspective on the importance of logistics is based on five years experience at remote sites on Earth, where remote base supply chain logistics didn't always work, (Taylor, 1975a). The planning and control of the flow of goods and materials to and from the moon's surface may be the most complicated logistics challenges yet to be attempted. Affordability is tied to the innovation and ingenuity used to keep the transportation and surface operations costs as low as practical. Eleven innovations are proposed and discussed by an entrepreneurial commercial space startup team that has had success in introducing commercial space innovation and reducing the cost of space operations in the past. This logistics architecture offers NASA and other exploring nations a commercial alternative for non-essential cargo. Five transportation technologies and eleven surface innovations create the logistics transportation system discussed.

  18. Hyperpolarizability and Operational Magic Wavelength in an Optical Lattice Clock

    NASA Astrophysics Data System (ADS)

    Brown, R. C.; Phillips, N. B.; Beloy, K.; McGrew, W. F.; Schioppo, M.; Fasano, R. J.; Milani, G.; Zhang, X.; Hinkley, N.; Leopardi, H.; Yoon, T. H.; Nicolodi, D.; Fortier, T. M.; Ludlow, A. D.

    2017-12-01

    Optical clocks benefit from tight atomic confinement enabling extended interrogation times as well as Doppler- and recoil-free operation. However, these benefits come at the cost of frequency shifts that, if not properly controlled, may degrade clock accuracy. Numerous theoretical studies have predicted optical lattice clock frequency shifts that scale nonlinearly with trap depth. To experimentally observe and constrain these shifts in an 171Yb optical lattice clock, we construct a lattice enhancement cavity that exaggerates the light shifts. We observe an atomic temperature that is proportional to the optical trap depth, fundamentally altering the scaling of trap-induced light shifts and simplifying their parametrization. We identify an "operational" magic wavelength where frequency shifts are insensitive to changes in trap depth. These measurements and scaling analysis constitute an essential systematic characterization for clock operation at the 10-18 level and beyond.

  19. CoalVal-A coal resource valuation program

    USGS Publications Warehouse

    Rohrbacher, Timothy J.; McIntosh, Gary E.

    2010-01-01

    CoalVal is a menu-driven Windows program that produces cost-of-mining analyses of mine-modeled coal resources. Geological modeling of the coal beds and some degree of mine planning, from basic prefeasibility to advanced, must already have been performed before this program can be used. United States Geological Survey mine planning is done from a very basic, prefeasibility standpoint, but the accuracy of CoalVal's output is a reflection of the accuracy of the data entered, both for mine costs and mine planning. The mining cost analysis is done by using mine cost models designed for the commonly employed, surface and underground mining methods utilized in the United States. CoalVal requires a Microsoft Windows? 98 or Windows? XP operating system and a minimum of 1 gigabyte of random access memory to perform operations. It will not operate on Microsoft Vista?, Windows? 7, or Macintosh? operating systems. The program will summarize the evaluation of an unlimited number of coal seams, haulage zones, tax entities, or other area delineations for a given coal property, coalfield, or basin. When the reader opens the CoalVal publication from the USGS website, options are provided to download the CoalVal publication manual and the CoalVal Program. The CoalVal report is divided into five specific areas relevant to the development and use of the CoalVal program: 1. Introduction to CoalVal Assumptions and Concepts. 2. Mine Model Assumption Details (appendix A). 3. CoalVal Project Tutorial (appendix B). 4. Program Description (appendix C). 5. Mine Model and Discounted Cash Flow Formulas (appendix D). The tutorial explains how to enter coal resource and quality data by mining method; program default values for production, operating, and cost variables; and ones own operating and cost variables into the program. Generated summary reports list the volume of resource in short tons available for mining, recoverable short tons by mining method; the seam or property being mined; operating cost per ton; and discounted cash flow cost per ton to mine and process the resources. Costs are calculated as loaded in a unit train, free-on-board the tipple, at a rate of return prescribed by the evaluator. The recoverable resources (in short tons) may be grouped by incremental cost over any range chosen by the user. For example, in the Gillette coalfield evaluation, the discounted cash flow mining cost (at an 8 percent rate of return) and its associated tonnage may be grouped by any applicable increment (for example, $0.10 per ton, $0.20 per ton, and so on) and using any dollar per ton range that is desired (for example, from $4.00 per ton to $15.00 per ton). This grouping ability allows the user to separate the coal reserves from the nonreserve resources and to construct cost curves to determine the effects of coal market fluctuations on the availability of coal for fuel whether for the generation of electricity or for coal-to-liquids processes. Coking coals are not addressed in this report.

  20. Advanced Small Modular Reactor Economics Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.

    2014-10-01

    This report describes the data collection work performed for an advanced small modular reactor (AdvSMR) economics analysis activity at the Oak Ridge National Laboratory. The methodology development and analytical results are described in separate, stand-alone documents as listed in the references. The economics analysis effort for the AdvSMR program combines the technical and fuel cycle aspects of advanced (non-light water reactor [LWR]) reactors with the market and production aspects of SMRs. This requires the collection, analysis, and synthesis of multiple unrelated and potentially high-uncertainty data sets from a wide range of data sources. Further, the nature of both economic andmore » nuclear technology analysis requires at least a minor attempt at prediction and prognostication, and the far-term horizon for deployment of advanced nuclear systems introduces more uncertainty. Energy market uncertainty, especially the electricity market, is the result of the integration of commodity prices, demand fluctuation, and generation competition, as easily seen in deregulated markets. Depending on current or projected values for any of these factors, the economic attractiveness of any power plant construction project can change yearly or quarterly. For long-lead construction projects such as nuclear power plants, this uncertainty generates an implied and inherent risk for potential nuclear power plant owners and operators. The uncertainty in nuclear reactor and fuel cycle costs is in some respects better understood and quantified than the energy market uncertainty. The LWR-based fuel cycle has a long commercial history to use as its basis for cost estimation, and the current activities in LWR construction provide a reliable baseline for estimates for similar efforts. However, for advanced systems, the estimates and their associated uncertainties are based on forward-looking assumptions for performance after the system has been built and has achieved commercial operation. Advanced fuel materials and fabrication costs have large uncertainties based on complexities of operation, such as contact-handled fuel fabrication versus remote handling, or commodity availability. Thus, this analytical work makes a good faith effort to quantify uncertainties and provide qualifiers, caveats, and explanations for the sources of these uncertainties. The overall result is that this work assembles the necessary information and establishes the foundation for future analyses using more precise data as nuclear technology advances.« less

Top