Sample records for construction implementation phases

  1. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  2. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.769 Construction and implementation of Phase II nationwide licenses...

  3. 75 FR 13336 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Approved for Collection at Key West International Airport (EYW) and Use at EYW: Runway safety area design. Runway safety area construction. Approach clearing--design. Runway obstruction clearing--design. Runway obstruction clearing, phase II--construction. Noise implementation plan, phase 6--design. Noise implementation...

  4. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  5. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  6. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  7. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  8. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  9. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regional licenses. 90.767 Section 90.767 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.767 Construction and implementation of EA and Regional licenses. (a...

  10. Implementation of GPS controlled highway construction equipment phase II.

    DOT National Transportation Integrated Search

    2008-01-01

    "During 2006, WisDOT and the Construction Materials and Support Center at UW-Madison worked together to develop : a specification and QC/QA procedures for GPS machine guidance on highway construction grading operations. These : specifications and pro...

  11. Competency-Based Preservice Construction Trades Curriculum, Phase II. Final Report.

    ERIC Educational Resources Information Center

    Nelms, Howard F.

    A two-phase curriculum project was undertaken in Illinois to develop, test, and implement a two-year competency-based model for the education of secondary school building construction teachers in the area of residential structures. During the first contract period, skill and knowledge competencies were identified and validated for thirteen units…

  12. Thermoplastic Joining and Assembly of Bulk Metallic Glass Composites Through Capacitive Discharge

    NASA Technical Reports Server (NTRS)

    Roberts, Scott N. (Inventor); Schramm, Joseph P. (Inventor); Hofmann, Douglas C. (Inventor); Johnson, William L. (Inventor); Kozachkov, Henry (Inventor); Demetriou, Marios D. (Inventor)

    2015-01-01

    Systems and methods for joining BMG Composites are disclosed. Specifically, the joining of BMG Composites is implemented so as to preserve the amorphicity of their matrix phase and the microstructure of their particulate phase. Implementation of the joining method with respect to the construction of modular cellular structures that comprise BMG Composites is also discussed.

  13. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  14. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  15. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  16. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  17. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  18. Implementation of GPS controlled highway construction equipment, phase III.

    DOT National Transportation Integrated Search

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  19. Electronic construction collaboration system : phase III.

    DOT National Transportation Integrated Search

    2011-12-01

    This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...

  20. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... their authorized channels at all of their base stations or fixed stations. [69 FR 75173, Dec. 15, 2004] ... will not be converted to individual, site-by-site authorizations for already constructed stations. (d...

  1. Environmental impact assessment of a package type IFAS reactor during construction and operational phases: a life cycle approach.

    PubMed

    Singh, Nitin Kumar; Singh, Rana Pratap; Kazmi, Absar Ahmad

    2017-05-01

    In the present study, a life cycle assessment (LCA) approach was used to analyse the environmental impacts associated with the construction and operational phases of an integrated fixed-film activated sludge (IFAS) reactor treating municipal wastewater. This study was conducted within the boundaries of a research project that aimed to investigate the implementation related challenges of a package type IFAS reactor from an environmental perspective. Along with the LCA results of the construction phase, a comparison of the LCA results of seven operational phases is also presented in this study. The results showed that among all the inputs, the use of stainless steel in the construction phase caused the highest impact on environment, followed by electricity consumption in raw materials production. The impact of the construction phase on toxicity impact indicators was found to be significant compared to all operational phases. Among the seven operational phases of this study, the dissolved oxygen phase III, having a concentration of ∼4.5 mg/L, showed the highest impact on abiotic depletion, acidification, global warming, ozone layer depletion, human toxicity, fresh water eco-toxicity, marine aquatic eco-toxicity, terrestrial eco-toxicity, and photochemical oxidation. However, better effluent quality in this phase reduced the eutrophication load on environment.

  2. Electronic construction collaboration system -- final phase.

    DOT National Transportation Integrated Search

    2014-09-01

    This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as : Attolist) on the Iowa Falls Arch Bridge project and (2) develop a WPMS for projects under $10 million. : For the first maj...

  3. System dynamic modeling on construction waste management in Shenzhen, China.

    PubMed

    Tam, Vivian W Y; Li, Jingru; Cai, Hong

    2014-05-01

    This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.

  4. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, Philip

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  5. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  6. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... implementing both short-range and long-range projects. Proposed facility improvements and phased construction... Institute Foreign Language Center (DLIFLC). Facilities, construction, improvements, renovations... have modern facilities consistent with Army standards well into the 21st Century. The overall goal is...

  7. The Planning, Implementation, and Movement of an Academic Library Collection.

    ERIC Educational Resources Information Center

    Kurkul, Donna Lee

    1983-01-01

    Discusses methodology, logistics, and time/cost study of planning, implementation, and relocation of 682,810 volume Smith College Library collection into its newly constructed and renovated facility. Call number sequence location, collection movement phasing and formulas for sequence distribution, and personnel requirements are noted. Elementary…

  8. Development Directions for Various Types of the Light Wood-Framed Structures

    NASA Astrophysics Data System (ADS)

    Malesza, J.; Baszeń, M.; Miedziałowski, Cz

    2017-11-01

    The paper presents current trends in the development of the wood-framed structures. Authors describe the evolution of the technology of implementation, the production process of precast elements of buildings as well as selected realization on the site of these kinds of structures. The attention has been paid to the effect of implementation phases on construction and erecting technology of the wood-framed structures. The paper draws attention to the importance and enhancement of structural analysis of structures in individual phases of building realization.

  9. Design and Implementation of a Basic Cross-Compiler and Virtual Memory Management System for the TI-59 Programmable Calculator.

    DTIC Science & Technology

    1983-06-01

    previously stated requirements to construct the framework for a software soluticn. It is during this phase of design that lany cf the most critical...the linker would have to be deferred until the compiler was formalized and ir the implementation phase of design. The second problem involved...memory liait was encountered. At this point a segmentation occurred. The memory limits were reset and the combining process continued until another

  10. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  11. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  12. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  13. GROWING ALTERNATIVE SUSTAINABLE BUILDINGS: BIOCOMPOSITE PRODUCTS FROM NATURAL FIBER, BIODEGRADABLE AND RECYCLABLE POLYMER MATERIALS FOR LOAD-BEARING CONSTRUCTION COMPONENTS

    EPA Science Inventory

    The Phase 2 proposal set out to define a number of limited research objectives to carry the project forward, based on the success of research and design carried out in Phase I through to the development and implementation of the project towards a marketable commodity for th...

  14. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  15. Satellite mobile data service for Canada

    NASA Technical Reports Server (NTRS)

    Egan, Glenn R.; Sward, David J.

    1990-01-01

    A commercial mobile satellite system which is to be constructed and operated in Canada is examined. This is done in two phases. First, mobile data services was introduced. Hub equipment and 3000 mobile data terminals were supplied. Over the satellite tests were performed. The mobile data service provides full two way digital messaging automatic vehicle location and fleet management services. The second phase is to construct, launch and make operational the MSAT satellite and associated network control facilities. The implementation is examined of the mobile data service in Canada, including the technical description. Marketing and applications are also examined.

  16. A Pragmatic Approach to Guide Implementation Evaluation Research: Strategy Mapping for Complex Interventions.

    PubMed

    Huynh, Alexis K; Hamilton, Alison B; Farmer, Melissa M; Bean-Mayberry, Bevanne; Stirman, Shannon Wiltsey; Moin, Tannaz; Finley, Erin P

    2018-01-01

    Greater specification of implementation strategies is a challenge for implementation science, but there is little guidance for delineating the use of multiple strategies involved in complex interventions. The Cardiovascular (CV) Toolkit project entails implementation of a toolkit designed to reduce CV risk by increasing women's engagement in appropriate services. The CV Toolkit project follows an enhanced version of Replicating Effective Programs (REP), an evidence-based implementation strategy, to implement the CV Toolkit across four phases: pre-conditions, pre-implementation, implementation, and maintenance and evolution. Our current objective is to describe a method for mapping implementation strategies used in real time as part of the CV Toolkit project. This method supports description of the timing and content of bundled strategies and provides a structured process for developing a plan for implementation evaluation. We conducted a process of strategy mapping to apply Proctor and colleagues' rubric for specification of implementation strategies, constructing a matrix in which we identified each implementation strategy, its conceptual group, and the corresponding REP phase(s) in which it occurs. For each strategy, we also specified the actors involved, actions undertaken, action targets, dose of the implementation strategy, and anticipated outcome addressed. We iteratively refined the matrix with the implementation team, including use of simulation to provide initial validation. Mapping revealed patterns in the timing of implementation strategies within REP phases. Most implementation strategies involving the development of stakeholder interrelationships and training and educating stakeholders were introduced during the pre-conditions or pre-implementation phases. Strategies introduced in the maintenance and evolution phase emphasized communication, re-examination, and audit and feedback. In addition to its value for producing valid and reliable process evaluation data, mapping implementation strategies has informed development of a pragmatic blueprint for implementation and longitudinal analyses and evaluation activities. We update recent recommendations on specification of implementation strategies by considering the implications for multi-strategy frameworks and propose an approach for mapping the use of implementation strategies within complex, multi-level interventions, in support of rigorous evaluation. Developing pragmatic tools to aid in operationalizing the conduct of implementation and evaluation activities is essential to enacting sound implementation research.

  17. Scheme for implementing 1 → M symmetric economical phase-covariant telecloning based on quantum logic network

    NASA Astrophysics Data System (ADS)

    Zhou, Yan-Hui; Wang, Lei

    2012-04-01

    The quantum logic network to implement 1 → M symmetric economical phase-covariant telecloning is presented. The scheme includes two parts: the first part is used to create the telecloning channel and the second part to teleport the input state. The telecloning channel which works without ancilla is constructed by two kinds of elementary unitary transformations, single-qubit rotation and multiple-qubit controlled operation. The probability of success is 50%, which is the same with the scheme in [Meng, F.Y.; Zhu, A.D. J. Mod. Opt. 2009, 56, 1255-1259].

  18. Complex evaluation of the loft-style of retrivation as a type of building conversion

    NASA Astrophysics Data System (ADS)

    Chulkov, V.; Kazaryan, R.; Kuzina, O.; Maloyan, G.; Efimenko, A.

    2017-10-01

    Construction reorganization is part of a basic reorganization cycle in which four phases (phases, states, technological redistribution) are consistently implemented: device, disorganization, reorganization and co-organization. The field of our research lies in the phase of reconstruction. One of the varieties of building reconstruction is retrieval (from English retrieve - to restore, find) - bringing the reorganized object into a working state by attaching to the old functional building system of the new system. Retraining provides the ability to replace elements of the new system locally or in general (implementing the principle of “assembly-disassembly”) and provides for the elimination of the moral deterioration of the building and the normal operation of the facility. In the construction and transport industry there is a sufficiently large number of multiparameter tasks that require a systematic approach and the definition of a single integrated indicator of the effectiveness of the operation. These tasks can be solved using a variety of approaches. One of such approaches, as the method of integral evaluation based on stellar infographic models, is considered.

  19. The prospects of construction and transport industry

    NASA Astrophysics Data System (ADS)

    Yaskova, Natalia

    2017-10-01

    The article is focused on a problem of moving the construction industry into the growth and prosperity phase. The method of target orienting developed by the author is aimed at overcoming technological weakness of the construction industry and eliminating disproportions of the capital funds’ structure. Exhaustion of traditional sources of construction industry growth and real property market growth required the research on specific technologies of interphase transformations and their development. It will contribute to implementing the objective laws of the new wave of construction growth, which provides the development of immovable’s structure that is reasonable in terms of strategic priorities of the national economy.

  20. Mobile work platform for initial lunar base construction

    NASA Technical Reports Server (NTRS)

    Brazell, James W.; Maclaren, Brice K.; Mcmurray, Gary V.; Williams, Wendell M.

    1992-01-01

    Described is a system of equipment intended for site preparation and construction of a lunar base. The proximate era of lunar exploration and the initial phase of outpost habitation are addressed. Drilling, leveling, trenching, and cargo handling are within the scope of the system's capabilities. The centerpiece is a three-legged mobile work platform, named SKITTER. Using standard interfaces, the system is modular in nature and analogous to the farmer's tractor and implement set. Conceptually somewhat different from their Earthbound counterparts, the implements are designed to take advantage of the lunar environment as well as the capabilities of the work platform. The proposed system is mechanically simple and weight efficient.

  1. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  2. GPS-Like Phasing Control of the Space Solar Power System Transmission Array

    NASA Technical Reports Server (NTRS)

    Psiaki, Mark L.

    2003-01-01

    The problem of phasing of the Space Solar Power System's transmission array has been addressed by developing a GPS-like radio navigation system. The goal of this system is to provide power transmission phasing control for each node of the array that causes the power signals to add constructively at the ground reception station. The phasing control system operates in a distributed manner, which makes it practical to implement. A leader node and two radio navigation beacons are used to control the power transmission phasing of multiple follower nodes. The necessary one-way communications to the follower nodes are implemented using the RF beacon signals. The phasing control system uses differential carrier phase relative navigation/timing techniques. A special feature of the system is an integer ambiguity resolution procedure that periodically resolves carrier phase cycle count ambiguities via encoding of pseudo-random number codes on the power transmission signals. The system is capable of achieving phasing accuracies on the order of 3 mm down to 0.4 mm depending on whether the radio navigation beacons operate in the L or C bands.

  3. Creating a Learning Culture for Medical Consortia in China.

    PubMed

    He, Guozhong; Chen, Zimin

    In China's recent health care reforms, both individuals and organizations have shown an ever-growing desire and demand for new knowledge and skills. A health care delivery system (HCDS) should explore new ways for creating a learning organization (LO) and should organically combine HCDS culture construction with the LO construction to build a cultural atmosphere that is conducive to the development of the LO. This article describes the implementation phase, characteristics, and realization strategy of an HCDS construction for the ultimate purpose of enhancing HCDS cohesion, solidarity, and sustainable development.

  4. Implementation of GPS Machine Controlled Grading - Phase III (2008) and Technical Training

    DOT National Transportation Integrated Search

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading projects. These specifications and proc...

  5. Phase 0 study for a geothermal superheated water proof of concept facility

    NASA Technical Reports Server (NTRS)

    Douglass, R. H.; Pearson, R. O.

    1974-01-01

    A Phase 0 study for the selection of a representative liquid-dominated geothermal resource of moderate salinity and temperature is discussed. Selection and conceptual design of a nominal 10-MWe energy conversion system, and implementation planning for Phase 1: subsystem (component, experiments) and Phase 2: final design, construction, and operation of experimental research facilities are reported. The objective of the overall program is to demonstrate the technical and economic viability of utilizing moderate temperature and salinity liquid-dominated resources with acceptable environmental impact, and thus encourage commercial scale development of geothermal electrical power generation.

  6. Deterministic quantum controlled-PHASE gates based on non-Markovian environments

    NASA Astrophysics Data System (ADS)

    Zhang, Rui; Chen, Tian; Wang, Xiang-Bin

    2017-12-01

    We study the realization of the quantum controlled-PHASE gate in an atom-cavity system beyond the Markovian approximation. The general description of the dynamics for the atom-cavity system without any approximation is presented. When the spectral density of the reservoir has the Lorentz form, by making use of the memory backflow from the reservoir, we can always construct the deterministic quantum controlled-PHASE gate between a photon and an atom, no matter the atom-cavity coupling strength is weak or strong. While, the phase shift in the output pulse hinders the implementation of quantum controlled-PHASE gates in the sub-Ohmic, Ohmic or super-Ohmic reservoirs.

  7. Implementation of Performance Assessment in STEM (Science, Technology, Engineering, Mathematics) Education to Detect Science Process Skill

    NASA Astrophysics Data System (ADS)

    Septiani, A.; Rustaman, N. Y.

    2017-02-01

    A descriptive study about the implementation of performance assessment in STEM based instruction was carried out to investigate the tenth grade of Vocational school students’ science process skills during the teaching learning processes. A number of tenth grade agriculture students was involved as research subjects selected through cluster random sampling technique (n=35). Performance assessment was planned on skills during the teaching learning process through observation and on product resulted from their engineering practice design. The procedure conducted in this study included thinking phase (identifying problem and sharing idea), designing phase, construction phase, and evaluation phase. Data was collected through the use of science process skills (SPS) test, observation sheet on student activity, as well as tasks and rubrics for performance assessment during the instruction. Research findings show that the implementation of performance assessment in STEM education in planting media could detect students science process skills better from the observation individually compared through SPS test. It was also found that the result of performance assessment was diverse when it was correlated to each indicator of SPS (strong and positive; weak and positive).

  8. Fault-tolerant composite Householder reflection

    NASA Astrophysics Data System (ADS)

    Torosov, Boyan T.; Kyoseva, Elica; Vitanov, Nikolay V.

    2015-07-01

    We propose a fault-tolerant implementation of the quantum Householder reflection, which is a key operation in various quantum algorithms, quantum-state engineering, generation of arbitrary unitaries, and entanglement characterization. We construct this operation using the modular approach of composite pulses and a relation between the Householder reflection and the quantum phase gate. The proposed implementation is highly insensitive to variations in the experimental parameters, which makes it suitable for high-fidelity quantum information processing.

  9. Leveling the Playing Field: Graphical Aids on Mathematics Tests

    ERIC Educational Resources Information Center

    Jiménez, Albert M.; Nixon, Casey B.; Zepeda, Sally J.

    2017-01-01

    This research suggests that structural accommodation can be implemented during the construction phase of standardized mathematics examinations. Data from a racially diverse district in the United States are used to compare student performance on questions with and without graphical aids. Findings suggest that mathematics questions possessing…

  10. Sea-Based X-Band (SBX) Radar Vessel Maintenance and Repair. Draft Environmental Assessment

    DTIC Science & Technology

    2011-02-14

    crabs, lobsters, and shrimp), amphipods (small shrimp-like creatures), bivalves, barnacles, and gastropods (snails and slugs). Less common groups...A second phase will cover implementation of 10 years of post construction monitoring and adaptive management. Future 1 4.0 Cumulative Impacts

  11. Constructing a Public Popular Education in Sao Paulo, Brazil.

    ERIC Educational Resources Information Center

    Wong, Pia Lindquist

    1995-01-01

    Examines school reform implemented by Paulo Freire and the Workers' Party in Sao Paulo during 1989-92. Focuses on various institutional mechanisms created to support teachers' efforts to learn the skills necessary for realization of reform objectives. Appendices list reform objectives and outline phases and activities in a teacher-directed…

  12. Solving a Local Boundary Value Problem for a Nonlinear Nonstationary System in the Class of Feedback Controls

    NASA Astrophysics Data System (ADS)

    Kvitko, A. N.

    2018-01-01

    An algorithm convenient for numerical implementation is proposed for constructing differentiable control functions that transfer a wide class of nonlinear nonstationary systems of ordinary differential equations from an initial state to a given point of the phase space. Constructive sufficient conditions imposed on the right-hand side of the controlled system are obtained under which this transfer is possible. The control of a robotic manipulator is considered, and its numerical simulation is performed.

  13. Radar wideband digital beamforming based on time delay and phase compensation

    NASA Astrophysics Data System (ADS)

    Fu, Wei; Jiang, Defu

    2018-07-01

    In conventional phased array radars, analogue time delay devices and phase shifters have been used for wideband beamforming. These methods suffer from insertion losses, gain mismatches and delay variations, and they occupy a large chip area. To solve these problems, a compact architecture of digital array antennas based on subarrays was considered. In this study, the receiving beam patterns of wideband linear frequency modulation (LFM) signals were constructed by applying analogue stretch processing via mixing with delayed reference signals at the subarray level. Subsequently, narrowband digital time delaying and phase compensation of the tone signals were implemented with reduced arithmetic complexity. Due to the differences in amplitudes, phases and time delays between channels, severe performance degradation of the beam patterns occurred without corrections. To achieve good beamforming performance, array calibration was performed in each channel to adjust the amplitude, frequency and phase of the tone signal. Using a field-programmable gate array, wideband LFM signals and finite impulse response filters with continuously adjustable time delays were implemented in a polyphase structure. Simulations and experiments verified the feasibility and effectiveness of the proposed digital beamformer.

  14. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  15. Three paths toward the quantum angle operator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gazeau, Jean Pierre, E-mail: gazeau@apc.univ-paris7.fr; Szafraniec, Franciszek Hugon, E-mail: franciszek.szafraniec@uj.edu.pl

    2016-12-15

    We examine mathematical questions around angle (or phase) operator associated with a number operator through a short list of basic requirements. We implement three methods of construction of quantum angle. The first one is based on operator theory and parallels the definition of angle for the upper half-circle through its cosine and completed by a sign inversion. The two other methods are integral quantization generalizing in a certain sense the Berezin–Klauder approaches. One method pertains to Weyl–Heisenberg integral quantization of the plane viewed as the phase space of the motion on the line. It depends on a family of “weight”more » functions on the plane. The third method rests upon coherent state quantization of the cylinder viewed as the phase space of the motion on the circle. The construction of these coherent states depends on a family of probability distributions on the line.« less

  16. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    NASA Astrophysics Data System (ADS)

    Lapidus, Azary; Abramov, Ivan

    2018-03-01

    Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

  17. Implementing the Common Core of Constructs: Measurement and Interviewer Training. The Project on State-Level Child Outcomes. Proceedings of the Meeting of the Operational Phase of the Project on State-Level Child Outcome (1st, Washington, DC, December 9, 1997).

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The Project on State-Level Child Outcomes is designed to assist states and other groups to improve the measurement of child outcomes in state welfare evaluations and in other state data systems. This report summarizes the first meeting of the five states (Connecticut, Florida, Indiana, Iowa, Minnesota) that participated in the operational phase of…

  18. An efficient algorithm for automatic phase correction of NMR spectra based on entropy minimization

    NASA Astrophysics Data System (ADS)

    Chen, Li; Weng, Zhiqiang; Goh, LaiYoong; Garland, Marc

    2002-09-01

    A new algorithm for automatic phase correction of NMR spectra based on entropy minimization is proposed. The optimal zero-order and first-order phase corrections for a NMR spectrum are determined by minimizing entropy. The objective function is constructed using a Shannon-type information entropy measure. Entropy is defined as the normalized derivative of the NMR spectral data. The algorithm has been successfully applied to experimental 1H NMR spectra. The results of automatic phase correction are found to be comparable to, or perhaps better than, manual phase correction. The advantages of this automatic phase correction algorithm include its simple mathematical basis and the straightforward, reproducible, and efficient optimization procedure. The algorithm is implemented in the Matlab program ACME—Automated phase Correction based on Minimization of Entropy.

  19. Recirculation or artificial aeration in vertical flow constructed wetlands: a comparative study for treating high load wastewater.

    PubMed

    Foladori, Paola; Ruaben, Jenny; Ortigara, Angela R C

    2013-12-01

    Vertical subsurface-flow constructed wetlands at pilot-scale have been applied to treat high hydraulic and organic loads by implementing the following configurations: (1) intermittent recirculation of the treated wastewater from the bottom to the top of the bed, (2) intermittent artificial aeration supplied at the bottom of the bed and (3) the combination of both. These configurations were operated with a saturated bottom layer for a 6h-treatment phase, followed by a free drainage phase prior to a new feeding. COD removal efficiency was 85-90% in all the configurations and removed loads were 54-70 gCOD m(-2)d(-1). The aerated and recirculated wetland resulted in a higher total nitrogen removal (8.6 gN m(-2)d(-1)) due to simultaneous nitrification/denitrification, even in the presence of intermittent aeration (6.8 Nm(3)m(-2)d(-1)). The extra investment needed for implementing aeration/recirculation would be compensated for by a reduction of the surface area per population equivalent, which decreased to 1.5m(2)/PE. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. Developing a logic model for youth mental health: participatory research with a refugee community in Beirut

    PubMed Central

    Afifi, Rema A; Makhoul, Jihad; El Hajj, Taghreed; Nakkash, Rima T

    2011-01-01

    Although logic models are now touted as an important component of health promotion planning, implementation and evaluation, there are few published manuscripts that describe the process of logic model development, and fewer which do so with community involvement, despite the increasing emphasis on participatory research. This paper describes a process leading to the development of a logic model for a youth mental health promotion intervention using a participatory approach in a Palestinian refugee camp in Beirut, Lebanon. First, a needs assessment, including quantitative and qualitative data collection was carried out with children, parents and teachers. The second phase was identification of a priority health issue and analysis of determinants. The final phase in the construction of the logic model involved development of an intervention. The process was iterative and resulted in a more grounded depiction of the pathways of influence informed by evidence. Constructing a logic model with community input ensured that the intervention was more relevant to community needs, feasible for implementation and more likely to be sustainable. PMID:21278370

  1. Optical colour image watermarking based on phase-truncated linear canonical transform and image decomposition

    NASA Astrophysics Data System (ADS)

    Su, Yonggang; Tang, Chen; Li, Biyuan; Lei, Zhenkun

    2018-05-01

    This paper presents a novel optical colour image watermarking scheme based on phase-truncated linear canonical transform (PT-LCT) and image decomposition (ID). In this proposed scheme, a PT-LCT-based asymmetric cryptography is designed to encode the colour watermark into a noise-like pattern, and an ID-based multilevel embedding method is constructed to embed the encoded colour watermark into a colour host image. The PT-LCT-based asymmetric cryptography, which can be optically implemented by double random phase encoding with a quadratic phase system, can provide a higher security to resist various common cryptographic attacks. And the ID-based multilevel embedding method, which can be digitally implemented by a computer, can make the information of the colour watermark disperse better in the colour host image. The proposed colour image watermarking scheme possesses high security and can achieve a higher robustness while preserving the watermark’s invisibility. The good performance of the proposed scheme has been demonstrated by extensive experiments and comparison with other relevant schemes.

  2. [Connectionist models of social learning: a case of learning by observing a simple task].

    PubMed

    Paignon, A; Desrichard, O; Bollon, T

    2004-03-01

    This article proposes a connectionist model of the social learning theory developed by Bandura (1977). The theory posits that an individual in an interactive situation is capable of learning new behaviours merely by observing them in others. Such learning is acquired through an initial phase in which the individual memorizes what he has observed (observation phase), followed by a second phase where he puts the recorded observations to use as a guide for adjusting his own behaviour (reproduction phase). We shall refer to the two above-mentioned phases to demonstrate that it is conceivable to simulate learning by observation otherwise than through the recording of perceived information using symbolic representation. To this end we shall rely on the formalism of ecological neuron networks (Parisi, Cecconi, & Nolfi, 1990) to implement an agent provided with the major processes identified as essential to learning through observation. The connectionist model so designed shall implement an agent capable of recording perceptive information and producing motor behaviours. The learning situation we selected associates an agent demonstrating goal-achievement behaviour and an observer agent learning the same behaviour by observation. Throughout the acquisition phase, the demonstrator supervises the observer's learning process based on association between spatial information (input) and behavioural information (output). Representation thus constructed then serves as an adjustment guide during the production phase, involving production by the observer of a sequence of actions which he compares to the representation stored in distributed form as constructed through observation. An initial simulation validates model architecture by confirming the requirement for both phases identified in the literature (Bandura, 1977) to simulate learning through observation. The representation constructed over the observation phase evidences acquisition of observed behaviours, although this phase alone is not sufficient to ensure accurate reproduction and must be made functional through the production phase (Deakin & Proteau, 2000). Results obtained through a second simulation replicate those produced by Bandura & Jeffery (1973), who observed that the individual tested following the retention phase recalled recorded information better than he realized in the production phase. The outcome of a third simulation shows that, when performing the transfer task, agents performed the task all the more effectively when they were required to learn a simple path which facilitated knowledge transfer to an adjacent situation. New explanatory assumptions of the mechanics of learning through observation may be produced through OLEANNet. Thus, observed deterioration between memorization and production is caused by successive approximations which occur in the acquisition phase then in the production phase. Further, depending on the type of learning undergone by agents, use of representation as a production guide induces a more or less stringent constraint in the approximation of actual behaviour. This results, during the transfer task, in the ability to effectively generalize acquired knowledge where such knowledge is not specifically related to the task at hand. In conclusion, connectionist model architecture appears valid for modeling learning through observation as defined by Bandura (1977). However, certain limitations appear during implementation, especially in terms of the observed behaviour's availability and the planning of produced behaviours that future developments are liable to counter.

  3. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  5. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    PubMed

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  6. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  7. String order parameters for one-dimensional Floquet symmetry protected topological phases

    NASA Astrophysics Data System (ADS)

    Kumar, Ajesh; Dumitrescu, Philipp T.; Potter, Andrew C.

    2018-06-01

    Floquet symmetry protected topological (FSPT) phases are nonequilibrium topological phases enabled by time-periodic driving. FSPT phases of one-dimensional (1D) chains of bosons, spins, or qubits host dynamically protected edge states that can store quantum information without decoherence, making them promising for use as quantum memories. While FSPT order cannot be detected by any local measurement, here we construct nonlocal string order parameters that directly measure general 1D FSPT order. We propose a superconducting-qubit array based realization of the simplest Ising FSPT phase, which can be implemented with existing quantum computing hardware. We devise an interferometric scheme to directly measure the nonlocal string order using only simple one- and two-qubit operations and single-qubit measurements.

  8. The implementation of health promotion in primary and community care: a qualitative analysis of the 'Prescribe Vida Saludable' strategy.

    PubMed

    Martinez, Catalina; Bacigalupe, Gonzalo; Cortada, Josep M; Grandes, Gonzalo; Sanchez, Alvaro; Pombo, Haizea; Bully, Paola

    2017-02-17

    The impact of lifestyle on health is undeniable and effective healthy lifestyle promotion interventions do exist. However, this is not a fundamental part of routine primary care clinical practice. We describe factors that determine changes in performance of primary health care centers involved in piloting the health promotion innovation 'Prescribe Vida Saludable' (PVS) phase II. We engaged four primary health care centers of the Basque Healthcare Service in an action research project aimed at changing preventive health practices. Prescribe Healthy Life (PVS from the Spanish "Prescribe Vida Saludable) is focused on designing, planning, implementing and evaluating innovative programs to promote multiple healthy habits, feasible to be performed in routine primary health care conditions. After 2 years of piloting, centers were categorized as having high, medium, or low implementation effectiveness. We completed qualitative inductive and deductive analysis of five focus groups with the staff of the centers. Themes generated through consensual grounded qualitative analysis were compared between centers to identify the dimensions that explain the variation in actual implementation of PVS, and retrospectively organized and assessed against the Consolidated Framework for Implementation Research (CFIR). Of the 36 CFIR constructs, 11 were directly related to the level of implementation performance: intervention source, evidence strength and quality, adaptability, design quality and packaging, tension for change, learning climate, self-efficacy, planning, champions, executing, and reflecting and evaluating, with -organizational tracking added as a new sub-construct. Additionally, another seven constructs emerged in the participants' discourse but were not related to center performance: relative advantage, complexity, patients' needs and resources, external policy and incentives, structural characteristics, available resources, and formally appointed internal implementation leaders. Our findings indicate that the success of the implementation seems to be associated with the following components: the context, the implementation process, and the collaborative modelling. Identifying barriers and enablers is useful for designing implementation strategies for health promotion in primary health care centers that are essential for innovation success. An implementation model is proposed to highlight the relationships between the CFIR constructs in the context of health promotion in primary care.

  9. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  10. An Indoor Positioning-Based Mobile Payment System Using Bluetooth Low Energy Technology

    PubMed Central

    Winata, Doni

    2018-01-01

    The development of information technology has paved the way for faster and more convenient payment process flows and new methodology for the design and implementation of next generation payment systems. The growth of smartphone usage nowadays has fostered a new and popular mobile payment environment. Most of the current generation smartphones support Bluetooth Low Energy (BLE) technology to communicate with nearby BLE-enabled devices. It is plausible to construct an Over-the-Air BLE-based mobile payment system as one of the payment methods for people living in modern societies. In this paper, a secure indoor positioning-based mobile payment authentication protocol with BLE technology and the corresponding mobile payment system design are proposed. The proposed protocol consists of three phases: initialization phase, session key construction phase, and authentication phase. When a customer moves toward the POS counter area, the proposed mobile payment system will automatically detect the position of the customer to confirm whether the customer is ready for the checkout process. Once the system has identified the customer is standing within the payment-enabled area, the payment system will invoke authentication process between POS and the customer’s smartphone through BLE communication channel to generate a secure session key and establish an authenticated communication session to perform the payment transaction accordingly. A prototype is implemented to assess the performance of the proposed design for mobile payment system. In addition, security analysis is conducted to evaluate the security strength of the proposed protocol. PMID:29587399

  11. An Indoor Positioning-Based Mobile Payment System Using Bluetooth Low Energy Technology.

    PubMed

    Yohan, Alexander; Lo, Nai-Wei; Winata, Doni

    2018-03-25

    The development of information technology has paved the way for faster and more convenient payment process flows and new methodology for the design and implementation of next generation payment systems. The growth of smartphone usage nowadays has fostered a new and popular mobile payment environment. Most of the current generation smartphones support Bluetooth Low Energy (BLE) technology to communicate with nearby BLE-enabled devices. It is plausible to construct an Over-the-Air BLE-based mobile payment system as one of the payment methods for people living in modern societies. In this paper, a secure indoor positioning-based mobile payment authentication protocol with BLE technology and the corresponding mobile payment system design are proposed. The proposed protocol consists of three phases: initialization phase, session key construction phase, and authentication phase. When a customer moves toward the POS counter area, the proposed mobile payment system will automatically detect the position of the customer to confirm whether the customer is ready for the checkout process. Once the system has identified the customer is standing within the payment-enabled area, the payment system will invoke authentication process between POS and the customer's smartphone through BLE communication channel to generate a secure session key and establish an authenticated communication session to perform the payment transaction accordingly. A prototype is implemented to assess the performance of the proposed design for mobile payment system. In addition, security analysis is conducted to evaluate the security strength of the proposed protocol.

  12. Development of an Interactive Immersion Environment for Engendering Understanding about Nanotechnology: Concept, Construction, and Implementation

    ERIC Educational Resources Information Center

    Schönborn, Konrad J.; Höst, Gunnar E.; Palmerius, Karljohan E. Lundin; Flint, Jennifer

    2014-01-01

    The advent of nanoscientific applications in modern life is swiftly in progress. Nanoscale innovation comes with the pressing need to provide citizens and learners with scientific knowledge for judging the societal impact of nanotechnology. In rising to the challenge, this paper reports the developmental phase of a research agenda concerned with…

  13. 75 FR 33822 - Los Esteros Critical Energy Facility Low-Effect Habitat Conservation Plan for the Bay Checkerspot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ..., shoot, wound, kill, trap, capture or collect listed animal species, or to attempt to engage in such... within 10,306 acres of serpentine grasslands associated with the operations and maintenance of the Los... under the plan: Implementation and construction of the LECEF Phase 2, operations and maintenance of the...

  14. Design Techniques for Uniform-DFT, Linear Phase Filter Banks

    NASA Technical Reports Server (NTRS)

    Sun, Honglin; DeLeon, Phillip

    1999-01-01

    Uniform-DFT filter banks are an important class of filter banks and their theory is well known. One notable characteristic is their very efficient implementation when using polyphase filters and the FFT. Separately, linear phase filter banks, i.e. filter banks in which the analysis filters have a linear phase are also an important class of filter banks and desired in many applications. Unfortunately, it has been proved that one cannot design critically-sampled, uniform-DFT, linear phase filter banks and achieve perfect reconstruction. In this paper, we present a least-squares solution to this problem and in addition prove that oversampled, uniform-DFT, linear phase filter banks (which are also useful in many applications) can be constructed for perfect reconstruction. Design examples are included illustrate the methods.

  15. Elaboration d'une structure de collecte des matieres residuelles selon la Theorie Constructale

    NASA Astrophysics Data System (ADS)

    Al-Maalouf, George

    Currently, more than 80% of the waste management costs are attributed to the waste collection phase. In order to reduce these costs, one current solution resides in the implementation of waste transfer stations. In these stations, at least 3 collection vehicles transfer their load into a larger hauling truck. This cost reduction is based on the principle of economy of scale applied to the transportation sector. This solution improves the efficiency of the system; nevertheless, it does not optimize it. Recent studies show that the compactor trucks used in the collection phase generate significant economic losses mainly due to the frequent stops and the transportation to transfer stations often far from the collection area. This study suggests the restructuring of the waste collection process by dividing it into two phases: the collection phase, and the transportation to the transfer station phase. To achieve this, a deterministic theory called: "the Constructal Theory" (CT) is used. The results show that starting a certain density threshold, the application of the CT minimizes energy losses in the system. In fact, the collection is optimal if it is done using a combination of low capacity vehicle to collect door to door and transfer their charge into high-capacity trucks. These trucks will then transport their load to the transfer station. To minimize the costs of labor, this study proposes the use of Cybernetic Transport System (CTS) as an automated collection vehicle to collect small amounts of waste. Finally, the optimization method proposed is part of a decentralized approach to the collection and treatment of waste. This allows the implementation of multi-process waste treatment facilities on a territory scale. Keywords: Waste collection, Constructal Theory, Cybernetic Transportation Systems.

  16. Numerical Study of the Plasticity-Induced Stabilization Effect on Martensitic Transformations in Shape Memory Alloys

    NASA Astrophysics Data System (ADS)

    Junker, Philipp; Hempel, Philipp

    2017-12-01

    It is well known that plastic deformations in shape memory alloys stabilize the martensitic phase. Furthermore, the knowledge concerning the plastic state is crucial for a reliable sustainability analysis of construction parts. Numerical simulations serve as a tool for the realistic investigation of the complex interactions between phase transformations and plastic deformations. To account also for irreversible deformations, we expand an energy-based material model by including a non-linear isotropic hardening plasticity model. An implementation of this material model into commercial finite element programs, e.g., Abaqus, offers the opportunity to analyze entire structural components at low costs and fast computation times. Along with the theoretical derivation and expansion of the model, several simulation results for various boundary value problems are presented and interpreted for improved construction designing.

  17. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  18. BIM: Enabling Sustainability and Asset Management through Knowledge Management

    PubMed Central

    2013-01-01

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry. PMID:24324392

  19. BIM: enabling sustainability and asset management through knowledge management.

    PubMed

    Kivits, Robbert Anton; Furneaux, Craig

    2013-11-10

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry.

  20. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, asmore » set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)« less

  1. Experimental implementation of a nonlinear beamsplitter based on a phase-sensitive parametric amplifier

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fang, Yami; Feng, Jingliang; Cao, Leiming

    2016-03-28

    Beamsplitters have played an important role in quantum optics experiments. They are often used to split and combine two beams, especially in the construct of an interferometer. In this letter, we experimentally implement a nonlinear beamsplitter using a phase-sensitive parametric amplifier, which is based on four-wave mixing in hot rubidium vapor. Here we show that, despite the different frequencies of the two input beams, the output ports of the nonlinear beamsplitter exhibit interference phenomena. We make measurements of the interference fringe visibility and study how various parameters, such as the intensity gain of the amplifier, the intensity ratio of themore » two input beams, and the one and two photon detunings, affect the behavior of the nonlinear beamsplitter. It may find potential applications in quantum metrology and quantum information processing.« less

  2. Phased Array Beamforming and Imaging in Composite Laminates Using Guided Waves

    NASA Technical Reports Server (NTRS)

    Tian, Zhenhua; Leckey, Cara A. C.; Yu, Lingyu

    2016-01-01

    This paper presents the phased array beamforming and imaging using guided waves in anisotropic composite laminates. A generic phased array beamforming formula is presented, based on the classic delay-and-sum principle. The generic formula considers direction-dependent guided wave properties induced by the anisotropic material properties of composites. Moreover, the array beamforming and imaging are performed in frequency domain where the guided wave dispersion effect has been considered. The presented phased array method is implemented with a non-contact scanning laser Doppler vibrometer (SLDV) to detect multiple defects at different locations in an anisotropic composite plate. The array is constructed of scan points in a small area rapidly scanned by the SLDV. Using the phased array method, multiple defects at different locations are successfully detected. Our study shows that the guided wave phased array method is a potential effective method for rapid inspection of large composite structures.

  3. China Report, Economic Affairs

    DTIC Science & Technology

    1986-02-11

    Maosheng 99 New Phase of China’s Construction Business Reported (Gong Jiao; JINGJI RIBAO, 12 Sep 85) 101 Briefs Urumqi Fertilizer Plant ...order. In order to adapt cadre work to the new Situation in which the plant director assumes full responsibility, we must make some appropriate...changes in cadres’ work system, management methods, and appointments and dismissals to ensure the implementation of the system of having plant directors

  4. [Nursing care systematization in rehabilitation unit, in accordance to Horta's conceptual model].

    PubMed

    Neves, Rinaldo de Souza

    2006-01-01

    The utilization of a conceptual model in the Nursing Attendance Systemization allows the development of activities based on theoretical references that can guide the implantation and the implementation of nursing proceedings in hospitals. In this article we examine the option made for the implementation of the Horta's conceptual model in the construction of a nursing attendance system in the Rehabilitation Unit of a public hospital located in the Federal District of Brazil. Through the utilization of these theoretical references it was possible to make available a data collection tool based on the basic human needs. The identification of these needs made possible the construction of the hierarchically disposed pyramid of the neurological patients' modified basic needs. Through this reference paper we intend to elaborate the prescription and nursing evolution based in the concepts and standards of the Horta's nursing process, making possible the inter-relationship of all phases of this attendance methodology.

  5. Factors influencing a problem-based learning implementation: A case study of IT courses

    NASA Astrophysics Data System (ADS)

    Darus, Norida Muhd; Mohd, Haslina; Baharom, Fauziah; Saip, Mohamed Ali; Puteh, Nurnasran; Marzuki @ Matt, Zaharin; Husain, Mohd Zabidin; Yasin, Azman

    2016-08-01

    IT students must be trained to work efficiently as teamwork. One of the techniques that can be used to train them is through Problem-Based Learning (PBL) approach. The PBL implementation can be influenced by various factors depending on the ultimate goal of the study. This study is focusing on the IT students' perception of the PBL implementation. The student's perception is important to ensure the successfulness of the PBL implementation. Therefore, it is important to identify the factors that might influence the implementation of PBL of IT courses. This study aims to identify some catalyst factors that may influence the PBL implementation of IT courses. The study involved three (3) main phases: identifying PBL implementation factors, constructing a PBL model, and PBL model validation using statistical analysis. Four main factors are identified: PBL Characteristics, PBL Course Assessment, PBL Practices, and PBL Perception. Based on these four factors, a PBL model is constructed. Then, based on the proposed PBL model, four hypotheses are formulated and analyzed to validate the model. All hypotheses are significantly acceptable. The result shows that the PBL Characteristics and PBL Course Assessment factors are significantly influenced the PBL Practices and indirectly influenced the Students' Perception of the PBL Implementation for IT courses. This PBL model can assist decision makers in enhancing the PBL teaching and learning strategy for IT courses. It is also can be tested to other courses in the future.

  6. A Web-Based Decision Tool to Improve Contraceptive Counseling for Women With Chronic Medical Conditions: Protocol For a Mixed Methods Implementation Study

    PubMed Central

    Damschroder, Laura J; Fetters, Michael D; Zikmund-Fisher, Brian J; Crabtree, Benjamin F; Hudson, Shawna V; Ruffin IV, Mack T; Fucinari, Juliana; Kang, Minji; Taichman, L Susan; Creswell, John W

    2018-01-01

    Background Women with chronic medical conditions, such as diabetes and hypertension, have a higher risk of pregnancy-related complications compared with women without medical conditions and should be offered contraception if desired. Although evidence based guidelines for contraceptive selection in the presence of medical conditions are available via the United States Medical Eligibility Criteria (US MEC), these guidelines are underutilized. Research also supports the use of decision tools to promote shared decision making between patients and providers during contraceptive counseling. Objective The overall goal of the MiHealth, MiChoice project is to design and implement a theory-driven, Web-based tool that incorporates the US MEC (provider-level intervention) within the vehicle of a contraceptive decision tool for women with chronic medical conditions (patient-level intervention) in community-based primary care settings (practice-level intervention). This will be a 3-phase study that includes a predesign phase, a design phase, and a testing phase in a randomized controlled trial. This study protocol describes phase 1 and aim 1, which is to determine patient-, provider-, and practice-level factors that are relevant to the design and implementation of the contraceptive decision tool. Methods This is a mixed methods implementation study. To customize the delivery of the US MEC in the decision tool, we selected high-priority constructs from the Consolidated Framework for Implementation Research and the Theoretical Domains Framework to drive data collection and analysis at the practice and provider level, respectively. A conceptual model that incorporates constructs from the transtheoretical model and the health beliefs model undergirds patient-level data collection and analysis and will inform customization of the decision tool for this population. We will recruit 6 community-based primary care practices and conduct quantitative surveys and semistructured qualitative interviews with women who have chronic medical conditions, their primary care providers (PCPs), and clinic staff, as well as field observations of practice activities. Quantitative survey data will be summarized with simple descriptive statistics and relationships between participant characteristics and contraceptive recommendations (for PCPs), and current contraceptive use (for patients) will be examined using Fisher exact test. We will conduct thematic analysis of qualitative data from interviews and field observations. The integration of data will occur by comparing, contrasting, and synthesizing qualitative and quantitative findings to inform the future development and implementation of the intervention. Results We are currently enrolling practices and anticipate study completion in 15 months. Conclusions This protocol describes the first phase of a multiphase mixed methods study to develop and implement a Web-based decision tool that is customized to meet the needs of women with chronic medical conditions in primary care settings. Study findings will promote contraceptive counseling via shared decision making and reflect evidence-based guidelines for contraceptive selection. Trial Registration ClinicalTrials.gov NCT03153644; https://clinicaltrials.gov/ct2/show/NCT03153644 (Archived by WebCite at http://www.webcitation.org/6yUkA5lK8) PMID:29669707

  7. Vertical comb-drive microscanner with 4x4 array of micromirrors for phase-shifting Mirau microinterferometry

    NASA Astrophysics Data System (ADS)

    Bargiel, Sylwester; Lullin, Justine; Lemoal, Patrice; Perrin, Stéphane; Passilly, Nicolas; Albero, Jorge; Froehly, Luc; Lardet-Vieudrin, Franck; Gorecki, Christophe

    2016-04-01

    In this paper, we present construction, fabrication and characterization of an electrostatic MOEMS vertical microscanner for generation of an optical phase shift in array-type interferometric microsystems. The microscanner employs asymmetric comb-drives for a vertical displacement of a large 4x4 array of reference micromirrors and for in-situ position sensing. The device is designed to be fully compatible with Mirau configuration and with vertical integration strategy. This enables further integration of the device within an "active" multi-channel Mirau micro-interferometer and implementation of the phase shifting interferometry (PSI) technique for imaging applications. The combination of micro-interferometer and PSI is particularly interesting in the swept-source optical coherence tomography, since it allows not only strong size reduction of a system but also improvement of its performance (sensitivity, removal of the image artefacts). The technology of device is based on double-side DRIE of SOI wafer and vapor HF releasing of the suspended platform. In the static mode, the device provides vertical displacement of micromirrors up to 2.8μm (0 - 40V), whereas at resonance (fo=500 Hz), it reaches 0.7 μm for only 1VDC+1VAC. In both operation modes, the measured displacement is much more than required for PSI implementation (352nm peak-to-peak). The presented device is a key component of array-type Mirau micro-interferometer that enables the construction of portable, low-cost interferometric systems, e.g. for in vivo medical diagnostics.

  8. Analysis of strategic plans to assess planning for sustainability of comprehensive community initiatives.

    PubMed

    Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez

    2007-02-01

    In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.

  9. Implementation of a Bayesian design in a dose-escalation study of an experimental agent in healthy volunteers.

    PubMed

    Zhou, Yinghui; Whitehead, John; Korhonen, Pasi; Mustonen, Mika

    2008-03-01

    Bayesian decision procedures have recently been developed for dose escalation in phase I clinical trials concerning pharmacokinetic responses observed in healthy volunteers. This article describes how that general methodology was extended and evaluated for implementation in a specific phase I trial of a novel compound. At the time of writing, the study is ongoing, and it will be some time before the sponsor will wish to put the results into the public domain. This article is an account of how the study was designed in a way that should prove to be safe, accurate, and efficient whatever the true nature of the compound. The study involves the observation of two pharmacokinetic endpoints relating to the plasma concentration of the compound itself and of a metabolite as well as a safety endpoint relating to the occurrence of adverse events. Construction of the design and its evaluation via simulation are presented.

  10. Airflow and Particle Transport Through Human Airways: A Systematic Review

    NASA Astrophysics Data System (ADS)

    Kharat, S. B.; Deoghare, A. B.; Pandey, K. M.

    2017-08-01

    This paper describes review of the relevant literature about two phase analysis of air and particle flow through human airways. An emphasis of the review is placed on elaborating the steps involved in two phase analysis, which are Geometric modelling methods and Mathematical models. The first two parts describes various approaches that are followed for constructing an Airway model upon which analysis are conducted. Broad two categories of geometric modelling viz. Simplified modelling and Accurate modelling using medical scans are discussed briefly. Ease and limitations of simplified models, then examples of CT based models are discussed. In later part of the review different mathematical models implemented by researchers for analysis are briefed. Mathematical models used for Air and Particle phases are elaborated separately.

  11. Modeling Code Is Helping Cleveland Develop New Products

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Master Builders, Inc., is a 350-person company in Cleveland, Ohio, that develops and markets specialty chemicals for the construction industry. Developing new products involves creating many potential samples and running numerous tests to characterize the samples' performance. Company engineers enlisted NASA's help to replace cumbersome physical testing with computer modeling of the samples' behavior. Since the NASA Lewis Research Center's Structures Division develops mathematical models and associated computation tools to analyze the deformation and failure of composite materials, its researchers began a two-phase effort to modify Lewis' Integrated Composite Analyzer (ICAN) software for Master Builders' use. Phase I has been completed, and Master Builders is pleased with the results. The company is now working to begin implementation of Phase II.

  12. A Study to Design, Develop, Implement, Evaluate, and Revise Specific, Measurable Performance Objectives to Serve as a Model to Individualize Instruction for Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Wendt, Marilynn S.; Jacobson, Marjory E.

    Specific objectives of this two-phase study included: (1) assessment of design of the behavioral objectives in all secondary level courses; (2) construction of criteria for evaluation of the design; (3) testing of objectives against the evaluative criteria and/or the specifications of the curriculum design; and (4) determination of the validity of…

  13. Antimatched Electromagnetic Metasurfaces for Broadband Arbitrary Phase Manipulation in Reflection

    DOE PAGES

    Tsilipakos, Odysseas; Koschny, Thomas; Soukoulis, Costas M.

    2018-03-21

    Metasurfaces impart phase discontinuities on impinging electromagnetic waves that are typically limited to 0-2π. Here, we demonstrate that multiresonant metasurfaces can break free from this limitation and supply arbitrarily large, tunable time delays over ultrawide bandwidths. As such, ultrathin metasurfaces can act as the equivalent of thick bulk structures by emulating the multiple geometric resonances of three-dimensional systems that originate from phase accumulation with effective material resonances implemented on the surface itself via suitable subwavelength meta-atoms. We describe a constructive procedure for defining the required sheet admittivities of such metasurfaces. Importantly, the proposed approach provides an exactly linear phase responsemore » so that broadband pulses can experience the desired group delay without any distortion of the pulse shape. We focus on operation in reflection by exploiting an antimatching condition, satisfied by interleaved electric and magnetic Lorentzian resonances in the surface admittivities, which completely zeroes out transmission through the metasurface. As a result, the proposed metasurfaces can perfectly reflect a broadband pulse imparting a prescribed group delay. The group delay can be tuned by modifying the implemented resonances, thus opening up diverse possibilities in the temporal applications of metasurfaces.« less

  14. Antimatched Electromagnetic Metasurfaces for Broadband Arbitrary Phase Manipulation in Reflection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tsilipakos, Odysseas; Koschny, Thomas; Soukoulis, Costas M.

    Metasurfaces impart phase discontinuities on impinging electromagnetic waves that are typically limited to 0-2π. Here, we demonstrate that multiresonant metasurfaces can break free from this limitation and supply arbitrarily large, tunable time delays over ultrawide bandwidths. As such, ultrathin metasurfaces can act as the equivalent of thick bulk structures by emulating the multiple geometric resonances of three-dimensional systems that originate from phase accumulation with effective material resonances implemented on the surface itself via suitable subwavelength meta-atoms. We describe a constructive procedure for defining the required sheet admittivities of such metasurfaces. Importantly, the proposed approach provides an exactly linear phase responsemore » so that broadband pulses can experience the desired group delay without any distortion of the pulse shape. We focus on operation in reflection by exploiting an antimatching condition, satisfied by interleaved electric and magnetic Lorentzian resonances in the surface admittivities, which completely zeroes out transmission through the metasurface. As a result, the proposed metasurfaces can perfectly reflect a broadband pulse imparting a prescribed group delay. The group delay can be tuned by modifying the implemented resonances, thus opening up diverse possibilities in the temporal applications of metasurfaces.« less

  15. Strategic planning to reduce conflicts for offshore wind development in Taiwan: A social marketing perspective.

    PubMed

    Chen, Jyun-Long; Liu, Hsiang-Hsi; Chuang, Ching-Ta

    2015-10-15

    This study aims to improve the current inefficiency and ineffectiveness of communications among stakeholders when planning and constructing offshore wind farms (OWFs). An analysis using a social marketing approach with segmentation techniques is used to identify the target market based on stakeholders' perceptions. The empirical results identify three stakeholder segments: (1) impact-attend group; (2) comprehensive group; and (3) benefit-attend group. The results suggest that communication should be implemented to alter stakeholders' attitudes toward the construction of OWFs. Furthermore, based on the results of segmentation, target markets are identified to plan the communication strategies for reducing the conflicts among stakeholders of OWF construction. The results also indicated that in the planning phase of construction for OWFs, effective stakeholder participation and policy communication can enhance the perception of benefits to reduce conflict with local communities and ocean users. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. Development and Evaluation of Sensor Concepts for Ageless Aerospace Vehicles: Report 5 - Phase 2 Implementation of the Concept Demonstrator

    NASA Technical Reports Server (NTRS)

    Batten, Adam; Dunlop, John; Edwards, Graeme; Farmer, Tony; Gaffney, Bruce; Hedley, Mark; Hoschke, Nigel; Isaacs, Peter; Johnson, Mark; Lewis, Chris; hide

    2009-01-01

    This report describes the second phase of the implementation of the Concept Demonstrator experimental test-bed system containing sensors and processing hardware distributed throughout the structure, which uses multi-agent algorithms to characterize impacts and determine a suitable response to these impacts. This report expands and adds to the report of the first phase implementation. The current status of the system hardware is that all 192 physical cells (32 on each of the 6 hexagonal prism faces) have been constructed, although only four of these presently contain data-acquisition sub-modules to allow them to acquire sensor data. Impact detection.. location and severity have been successfully demonstrated. The software modules for simulating cells and controlling the test-bed are fully operational. although additional functionality will be added over time. The visualization workstation displays additional diagnostic information about the array of cells (both real and simulated) and additional damage information. Local agent algorithms have been developed that demonstrate emergent behavior of the complex multi-agent system, through the formation of impact damage boundaries and impact networks. The system has been shown to operate well for multiple impacts. and to demonstrate robust reconfiguration in the presence of damage to numbers of cells.

  17. Daily river flow prediction based on Two-Phase Constructive Fuzzy Systems Modeling: A case of hydrological - meteorological measurements asymmetry

    NASA Astrophysics Data System (ADS)

    Bou-Fakhreddine, Bassam; Mougharbel, Imad; Faye, Alain; Abou Chakra, Sara; Pollet, Yann

    2018-03-01

    Accurate daily river flow forecast is essential in many applications of water resources such as hydropower operation, agricultural planning and flood control. This paper presents a forecasting approach to deal with a newly addressed situation where hydrological data exist for a period longer than that of meteorological data (measurements asymmetry). In fact, one of the potential solutions to resolve measurements asymmetry issue is data re-sampling. It is a matter of either considering only the hydrological data or the balanced part of the hydro-meteorological data set during the forecasting process. However, the main disadvantage is that we may lose potentially relevant information from the left-out data. In this research, the key output is a Two-Phase Constructive Fuzzy inference hybrid model that is implemented over the non re-sampled data. The introduced modeling approach must be capable of exploiting the available data efficiently with higher prediction efficiency relative to Constructive Fuzzy model trained over re-sampled data set. The study was applied to Litani River in the Bekaa Valley - Lebanon by using 4 years of rainfall and 24 years of river flow daily measurements. A Constructive Fuzzy System Model (C-FSM) and a Two-Phase Constructive Fuzzy System Model (TPC-FSM) are trained. Upon validating, the second model has shown a primarily competitive performance and accuracy with the ability to preserve a higher day-to-day variability for 1, 3 and 6 days ahead. In fact, for the longest lead period, the C-FSM and TPC-FSM were able of explaining respectively 84.6% and 86.5% of the actual river flow variation. Overall, the results indicate that TPC-FSM model has provided a better tool to capture extreme flows in the process of streamflow prediction.

  18. The International Space Station human life sciences experiment implementation process

    NASA Technical Reports Server (NTRS)

    Miller, L. J.; Haven, C. P.; McCollum, S. G.; Lee, A. M.; Kamman, M. R.; Baumann, D. K.; Anderson, M. E.; Buderer, M. C.

    2001-01-01

    The selection, definition, and development phases of a Life Sciences flight research experiment has been consistent throughout the past decade. The implementation process, however, has changed significantly within the past two years. This change is driven primarily by the shift from highly integrated, dedicated research missions on platforms with well defined processes to self contained experiments with stand alone operations on platforms which are being concurrently designed. For experiments manifested on the International Space Station (ISS) and/or on short duration missions, the more modular, streamlined, and independent the individual experiment is, the more likely it is to be successfully implemented before the ISS assembly is completed. During the assembly phase of the ISS, science operations are lower in priority than the construction of the station. After the station has been completed, it is expected that more resources will be available to perform research. The complexity of implementing investigations increases with the logistics needed to perform the experiment. Examples of logistics issues include- hardware unique to the experiment; large up and down mass and volume needs; access to crew and hardware during the ascent or descent phases; maintenance of hardware and supplies with a limited shelf life,- baseline data collection schedules with lengthy sessions or sessions close to the launch or landing; onboard stowage availability, particularly cold stowage; and extensive training where highly proficient skills must be maintained. As the ISS processes become better defined, experiment implementation will meet new challenges due to distributed management, on-orbit resource sharing, and adjustments to crew availability pre- and post-increment. c 2001. Elsevier Science Ltd. All rights reserved.

  19. Coupled Structural, Thermal, Phase-change and Electromagnetic Analysis for Superconductors, Volume 2

    NASA Technical Reports Server (NTRS)

    Felippa, C. A.; Farhat, C.; Park, K. C.; Militello, C.; Schuler, J. J.

    1996-01-01

    Described are the theoretical development and computer implementation of reliable and efficient methods for the analysis of coupled mechanical problems that involve the interaction of mechanical, thermal, phase-change and electromag subproblems. The focus application has been the modeling of superconductivity and associated quantum-state phase change phenomena. In support of this objective the work has addressed the following issues: (1) development of variational principles for finite elements, (2) finite element modeling of the electromagnetic problem, (3) coupling of thermel and mechanical effects, and (4) computer implementation and solution of the superconductivity transition problem. The main accomplishments have been: (1) the development of the theory of parametrized and gauged variational principles, (2) the application of those principled to the construction of electromagnetic, thermal and mechanical finite elements, and (3) the coupling of electromagnetic finite elements with thermal and superconducting effects, and (4) the first detailed finite element simulations of bulk superconductors, in particular the Meissner effect and the nature of the normal conducting boundary layer. The theoretical development is described in two volumes. Volume 1 describes mostly formulation specific problems. Volume 2 describes generalization of those formulations.

  20. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Shawn W.

    2001-03-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band,more » westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.« less

  1. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  2. Phase behaviors of supramolecular graft copolymers with reversible bonding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Xu; Wang, Liquan, E-mail: jlin@ecust.edu.cn, E-mail: lq-wang@ecust.edu.cn; Jiang, Tao

    2013-11-14

    Phase behaviors of supramolecular graft copolymers with reversible bonding interactions were examined by the random-phase approximation and real-space implemented self-consistent field theory. The studied supramolecular graft copolymers consist of two different types of mutually incompatible yet reactive homopolymers, where one homopolymer (backbone) possesses multifunctional groups that allow second homopolymers (grafts) to be placed on. The calculations carried out show that the bonding strength exerts a pronounced effect on the phase behaviors of supramolecular graft copolymers. The length ratio of backbone to graft and the positions of functional groups along the backbone are also of importance to determine the phase behaviors.more » Phase diagrams were constructed at high bonding strength to illustrate this architectural dependence. It was found that the excess unbounded homopolymers swell the phase domains and shift the phase boundaries. The results were finally compared with the available experimental observations, and a well agreement is shown. The present work could, in principle, provide a general understanding of the phase behaviors of supramolecular graft copolymers with reversible bonding.« less

  3. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    NASA Astrophysics Data System (ADS)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.

  4. A Web-Based Decision Tool to Improve Contraceptive Counseling for Women With Chronic Medical Conditions: Protocol For a Mixed Methods Implementation Study.

    PubMed

    Wu, Justine P; Damschroder, Laura J; Fetters, Michael D; Zikmund-Fisher, Brian J; Crabtree, Benjamin F; Hudson, Shawna V; Ruffin, Mack T; Fucinari, Juliana; Kang, Minji; Taichman, L Susan; Creswell, John W

    2018-04-18

    Women with chronic medical conditions, such as diabetes and hypertension, have a higher risk of pregnancy-related complications compared with women without medical conditions and should be offered contraception if desired. Although evidence based guidelines for contraceptive selection in the presence of medical conditions are available via the United States Medical Eligibility Criteria (US MEC), these guidelines are underutilized. Research also supports the use of decision tools to promote shared decision making between patients and providers during contraceptive counseling. The overall goal of the MiHealth, MiChoice project is to design and implement a theory-driven, Web-based tool that incorporates the US MEC (provider-level intervention) within the vehicle of a contraceptive decision tool for women with chronic medical conditions (patient-level intervention) in community-based primary care settings (practice-level intervention). This will be a 3-phase study that includes a predesign phase, a design phase, and a testing phase in a randomized controlled trial. This study protocol describes phase 1 and aim 1, which is to determine patient-, provider-, and practice-level factors that are relevant to the design and implementation of the contraceptive decision tool. This is a mixed methods implementation study. To customize the delivery of the US MEC in the decision tool, we selected high-priority constructs from the Consolidated Framework for Implementation Research and the Theoretical Domains Framework to drive data collection and analysis at the practice and provider level, respectively. A conceptual model that incorporates constructs from the transtheoretical model and the health beliefs model undergirds patient-level data collection and analysis and will inform customization of the decision tool for this population. We will recruit 6 community-based primary care practices and conduct quantitative surveys and semistructured qualitative interviews with women who have chronic medical conditions, their primary care providers (PCPs), and clinic staff, as well as field observations of practice activities. Quantitative survey data will be summarized with simple descriptive statistics and relationships between participant characteristics and contraceptive recommendations (for PCPs), and current contraceptive use (for patients) will be examined using Fisher exact test. We will conduct thematic analysis of qualitative data from interviews and field observations. The integration of data will occur by comparing, contrasting, and synthesizing qualitative and quantitative findings to inform the future development and implementation of the intervention. We are currently enrolling practices and anticipate study completion in 15 months. This protocol describes the first phase of a multiphase mixed methods study to develop and implement a Web-based decision tool that is customized to meet the needs of women with chronic medical conditions in primary care settings. Study findings will promote contraceptive counseling via shared decision making and reflect evidence-based guidelines for contraceptive selection. ClinicalTrials.gov NCT03153644; https://clinicaltrials.gov/ct2/show/NCT03153644 (Archived by WebCite at http://www.webcitation.org/6yUkA5lK8). ©Justine P Wu, Laura J Damschroder, Michael D Fetters, Brian J Zikmund-Fisher, Benjamin F Crabtree, Shawna V Hudson, Mack T Ruffin IV, Juliana Fucinari, Minji Kang, L Susan Taichman, John W Creswell. Originally published in JMIR Research Protocols (http://www.researchprotocols.org), 18.04.2018.

  5. Reconfigurable firmware-defined radios synthesized from standard digital logic cells

    NASA Astrophysics Data System (ADS)

    Faisal, Muhammad; Park, Youngmin; Wentzloff, David D.

    2011-06-01

    This paper presents recent work on reconfigurable all-digital radio architectures. We leverage the flexibility and scalability of synthesized digital cells to construct reconfigurable radio architectures that consume significantly less power than a software defined radio implementing similar architectures. We present two prototypes of such architectures that can receive and demodulate FM and FRS band signals. Moreover, a radio architecture based on a reconfigurable alldigital phase-locked loop for coherent demodulation is presented.

  6. "I Think It's a Good Idea, I Just Don't Know How to Do It": The Struggle for PE Reform in China

    ERIC Educational Resources Information Center

    Hickey, Christopher; Jin, Aijing

    2010-01-01

    Among the many changes occurring across Chinese society in the early phase of Y2K is the construction and implementation of a new physical education (PE) curriculum. Not unlike recent changes in Australia, New Zealand and the UK, this process has seen a heightening of the emphasis on health. Presented within a wider framework for making the school…

  7. International academic program in technologies of light-water nuclear reactors. Phases of development and implementation

    NASA Astrophysics Data System (ADS)

    Geraskin, N. I.; Glebov, V. B.

    2017-01-01

    The results of implementation of European educational projects CORONA and CORONA II dedicated to preserving and further developing nuclear knowledge and competencies in the area of technologies of light-water nuclear reactors are analyzed. Present article addresses issues of design and implementation of the program for specialized training in the branch of technologies of light-water nuclear reactors. The systematic approach has been used to construct the program for students of nuclear specialties, which corresponding to IAEA standards and commonly accepted nuclear principles recognized in the European Union. Possibilities of further development of the international cooperation between countries and educational institutions are analyzed. Special attention is paid to e-learning/distance training, nuclear knowledge preservation and interaction with European Nuclear Education Network.

  8. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  9. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  10. Challenges in Construction Over Soft Soil - Case Studies in Malaysia

    NASA Astrophysics Data System (ADS)

    Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.

    2016-07-01

    Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

  11. An empirical analysis of strategy implementation process and performance of construction companies

    NASA Astrophysics Data System (ADS)

    Zaidi, F. I.; Zawawi, E. M. A.; Nordin, R. M.; Ahnuar, E. M.

    2018-02-01

    Strategy implementation is known as action stage where it is to be considered as the most difficult stage in strategic planning. Strategy implementation can influence the whole texture of a company including its performance. The aim of this research is to provide the empirical relationship between strategy implementation process and performance of construction companies. This research establishes the strategy implementation process and how it influences the performance of construction companies. This research used quantitative method approached via questionnaire survey. Respondents were G7 construction companies in Klang Valley, Selangor. Pearson correlation analysis indicate a strong positive relationship between strategy implementation process and construction companies’ performance. The most importance part of strategy implementation process is to provide sufficient training for employees which directly influence the construction companies’ profit growth and employees’ growth. This research results will benefit top management in the construction companies to conduct strategy implementation in their companies. This research may not reflect the whole construction industry in Malaysia. Future research may be resumed to small and medium grades contractors and perhaps in other areas in Malaysia.

  12. Topologically protected gates for quantum computation with non-Abelian anyons in the Pfaffian quantum Hall state

    NASA Astrophysics Data System (ADS)

    Georgiev, Lachezar S.

    2006-12-01

    We extend the topological quantum computation scheme using the Pfaffian quantum Hall state, which has been recently proposed by Das Sarma , in a way that might potentially allow for the topologically protected construction of a universal set of quantum gates. We construct, for the first time, a topologically protected controlled-NOT gate, which is entirely based on quasihole braidings of Pfaffian qubits. All single-qubit gates, except for the π/8 gate, are also explicitly implemented by quasihole braidings. Instead of the π/8 gate we try to construct a topologically protected Toffoli gate, in terms of the controlled-phase gate and CNOT or by a braid-group-based controlled-controlled- Z precursor. We also give a topologically protected realization of the Bravyi-Kitaev two-qubit gate g3 .

  13. Severe Accident Test Station Design Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snead, Mary A.; Yan, Yong; Howell, Michael

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure tomore » provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.« less

  14. Analysis of two-phase flow inter-subchannel mass and momentum exchanges by the two-fluid model approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ninokata, H.; Deguchi, A.; Kawahara, A.

    1995-09-01

    A new void drift model for the subchannel analysis method is presented for the thermohydraulics calculation of two-phase flows in rod bundles where the flow model uses a two-fluid formulation for the conservation of mass, momentum and energy. A void drift model is constructed based on the experimental data obtained in a geometrically simple inter-connected two circular channel test sections using air-water as working fluids. The void drift force is assumed to be an origin of void drift velocity components of the two-phase cross-flow in a gap area between two adjacent rods and to overcome the momentum exchanges at themore » phase interface and wall-fluid interface. This void drift force is implemented in the cross flow momentum equations. Computational results have been successfully compared to experimental data available including 3x3 rod bundle data.« less

  15. Automated discovery and construction of surface phase diagrams using machine learning

    DOE PAGES

    Ulissi, Zachary W.; Singh, Aayush R.; Tsai, Charlie; ...

    2016-08-24

    Surface phase diagrams are necessary for understanding surface chemistry in electrochemical catalysis, where a range of adsorbates and coverages exist at varying applied potentials. These diagrams are typically constructed using intuition, which risks missing complex coverages and configurations at potentials of interest. More accurate cluster expansion methods are often difficult to implement quickly for new surfaces. We adopt a machine learning approach to rectify both issues. Using a Gaussian process regression model, the free energy of all possible adsorbate coverages for surfaces is predicted for a finite number of adsorption sites. Our result demonstrates a rational, simple, and systematic approachmore » for generating accurate free-energy diagrams with reduced computational resources. Finally, the Pourbaix diagram for the IrO 2(110) surface (with nine coverages from fully hydrogenated to fully oxygenated surfaces) is reconstructed using just 20 electronic structure relaxations, compared to approximately 90 using typical search methods. Similar efficiency is demonstrated for the MoS 2 surface.« less

  16. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatmentmore » technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.« less

  17. Construction Of Critical Thinking Skills Test Instrument Related The Concept On Sound Wave

    NASA Astrophysics Data System (ADS)

    Mabruroh, F.; Suhandi, A.

    2017-02-01

    This study aimed to construct test instrument of critical thinking skills of high school students related the concept on sound wave. This research using a mixed methods with sequential exploratory design, consists of: 1) a preliminary study; 2) design and review of test instruments. The form of test instruments in essay questions, consist of 18 questions that was divided into 5 indicators and 8 sub-indicators of the critical thinking skills expressed by Ennis, with questions that are qualitative and contextual. Phases of preliminary study include: a) policy studies; b) survey to the school; c) and literature studies. Phases of the design and review of test instruments consist of two steps, namely a draft design of test instruments include: a) analysis of the depth of teaching materials; b) the selection of indicators and sub-indicators of critical thinking skills; c) analysis of indicators and sub-indicators of critical thinking skills; d) implementation of indicators and sub-indicators of critical thinking skills; and e) making the descriptions about the test instrument. In the next phase of the review test instruments, consist of: a) writing about the test instrument; b) validity test by experts; and c) revision of test instruments based on the validator.

  18. Advanced Fabrication Method for the Preparation of MOF Thin Films: Liquid-Phase Epitaxy Approach Meets Spin Coating Method.

    PubMed

    Chernikova, Valeriya; Shekhah, Osama; Eddaoudi, Mohamed

    2016-08-10

    Here, we report a new and advanced method for the fabrication of highly oriented/polycrystalline metal-organic framework (MOF) thin films. Building on the attractive features of the liquid-phase epitaxy (LPE) approach, a facile spin coating method was implemented to generate MOF thin films in a high-throughput fashion. Advantageously, this approach offers a great prospective to cost-effectively construct thin-films with a significantly shortened preparation time and a lessened chemicals and solvents consumption, as compared to the conventional LPE-process. Certainly, this new spin-coating approach has been implemented successfully to construct various MOF thin films, ranging in thickness from a few micrometers down to the nanometer scale, spanning 2-D and 3-D benchmark MOF materials including Cu2(bdc)2·xH2O, Zn2(bdc)2·xH2O, HKUST-1, and ZIF-8. This method was appraised and proved effective on a variety of substrates comprising functionalized gold, silicon, glass, porous stainless steel, and aluminum oxide. The facile, high-throughput and cost-effective nature of this approach, coupled with the successful thin film growth and substrate versatility, represents the next generation of methods for MOF thin film fabrication. Therefore, paving the way for these unique MOF materials to address a wide range of challenges in the areas of sensing devices and membrane technology.

  19. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  20. John Day Watershed Restoration Projects, annual report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Linda

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  1. Compact Embedded Wireless Sensor-Based Monitoring of Concrete Curing.

    PubMed

    Cabezas, Joaquín; Sánchez-Rodríguez, Trinidad; Gómez-Galán, Juan Antonio; Cifuentes, Héctor; González Carvajal, Ramón

    2018-03-15

    This work presents the design, construction and testing of a new embedded sensor system for monitoring concrete curing. A specific mote has been implemented to withstand the aggressive environment without affecting the measured variables. The system also includes a real-time monitoring application operating from a remote computer placed in a central location. The testing was done in two phases: the first in the laboratory, to validate the functional requirements of the developed devices; and the second on civil works to evaluate the functional features of the devices, such as range, robustness and flexibility. The devices were successfully implemented resulting in a low cost, highly reliable, compact and non-destructive solution.

  2. Compact Embedded Wireless Sensor-Based Monitoring of Concrete Curing

    PubMed Central

    Cabezas, Joaquín; Sánchez-Rodríguez, Trinidad; González Carvajal, Ramón

    2018-01-01

    This work presents the design, construction and testing of a new embedded sensor system for monitoring concrete curing. A specific mote has been implemented to withstand the aggressive environment without affecting the measured variables. The system also includes a real-time monitoring application operating from a remote computer placed in a central location. The testing was done in two phases: the first in the laboratory, to validate the functional requirements of the developed devices; and the second on civil works to evaluate the functional features of the devices, such as range, robustness and flexibility. The devices were successfully implemented resulting in a low cost, highly reliable, compact and non-destructive solution. PMID:29543765

  3. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  4. Thermally-actuated, phase change flow control for microfluidic systems.

    PubMed

    Chen, Zongyuan; Wang, Jing; Qian, Shizhi; Bau, Haim H

    2005-11-01

    An easy to implement, thermally-actuated, noninvasive method for flow control in microfluidic devices is described. This technique takes advantage of the phase change of the working liquid itself-the freezing and melting of a portion of a liquid slug-to noninvasively close and open flow passages (referred to as a phase change valve). The valve was designed for use in a miniature diagnostic system for detecting pathogens in oral fluids at the point of care. The paper describes the modeling, construction, and characteristics of the valve. The experimental results favorably agree with theoretical predictions. In addition, the paper demonstrates the use of the phase change valves for flow control, sample metering and distribution into multiple analysis paths, sealing of a polymerase chain reaction (PCR) chamber, and sample introduction into and withdrawal from a closed loop. The phase change valve is electronically addressable, does not require any moving parts, introduces only minimal dead volume, is leakage and contamination free, and is biocompatible.

  5. Implementation of dispersion-free slow acoustic wave propagation and phase engineering with helical-structured metamaterials

    PubMed Central

    Zhu, Xuefeng; Li, Kun; Zhang, Peng; Zhu, Jie; Zhang, Jintao; Tian, Chao; Liu, Shengchun

    2016-01-01

    The ability to slow down wave propagation in materials has attracted significant research interest. A successful solution will give rise to manageable enhanced wave–matter interaction, freewheeling phase engineering and spatial compression of wave signals. The existing methods are typically associated with constructing dispersive materials or structures with local resonators, thus resulting in unavoidable distortion of waveforms. Here we show that, with helical-structured acoustic metamaterials, it is now possible to implement dispersion-free sound deceleration. The helical-structured metamaterials present a non-dispersive high effective refractive index that is tunable through adjusting the helicity of structures, while the wavefront revolution plays a dominant role in reducing the group velocity. Finally, we numerically and experimentally demonstrate that the helical-structured metamaterials with designed inhomogeneous unit cells can turn a normally incident plane wave into a self-accelerating beam on the prescribed parabolic trajectory. The helical-structured metamaterials will have profound impact to applications in explorations of slow wave physics. PMID:27198887

  6. Students' construction of a simple steam distillation apparatus and development of creative thinking skills: A project-based learning

    NASA Astrophysics Data System (ADS)

    Diawati, Chansyanah; Liliasari, Setiabudi, Agus; Buchari

    2017-05-01

    This project-based learning combined the chemistry of separation process using steam distillation with engineering design process in an undergraduate chemistry course. Students built upon their knowledge of phase changes, immiscible mixture, and the relationship between vapor pressure and boiling point to complete a project of modifications steam distillation apparatus. The research method is a qualitative case study, which aims to describe how (1) the creative thinking skills of students emerged during six weeks of theproject, (2) students built steam distillation apparatus characteristics as the project product and (3) students response to the project-based learning model. The results showed that the students had successfully constructed a steam distillation apparatus using plastic kettle as steam generator and distillation flask. A Plastic tubewas used to drain water vapor from steam generator to distillation flask and to drain steam containing essential oil to the condenser. A biscuit tin filled with ice was used as a condenser. The time required until resulting distillate was fifteen minutes. The production of essential was conductive qualitatively by a very strong smell typical of essential oil and two phases of distillate. Throughout the project, students formulated the relevant and varied problem, formulated the goals, proposed the ideas of the apparatus and materials, draw apparatus design, constructed apparatus, tested apparatus, evaluated, and reported the project. Student response was generally positive. They were pleased, interested, more understanding the concepts and work apparatus principles, also implemented new ideas. These results indicate that project-based learning can develop students' creative thinking skills. Based on these results, it is necessary to conduct research and implemented project-based learning to other concepts.

  7. Fostering implementation of health services research findings into practice: a consolidated framework for advancing implementation science

    PubMed Central

    Damschroder, Laura J; Aron, David C; Keith, Rosalind E; Kirsh, Susan R; Alexander, Jeffery A; Lowery, Julie C

    2009-01-01

    Background Many interventions found to be effective in health services research studies fail to translate into meaningful patient care outcomes across multiple contexts. Health services researchers recognize the need to evaluate not only summative outcomes but also formative outcomes to assess the extent to which implementation is effective in a specific setting, prolongs sustainability, and promotes dissemination into other settings. Many implementation theories have been published to help promote effective implementation. However, they overlap considerably in the constructs included in individual theories, and a comparison of theories reveals that each is missing important constructs included in other theories. In addition, terminology and definitions are not consistent across theories. We describe the Consolidated Framework For Implementation Research (CFIR) that offers an overarching typology to promote implementation theory development and verification about what works where and why across multiple contexts. Methods We used a snowball sampling approach to identify published theories that were evaluated to identify constructs based on strength of conceptual or empirical support for influence on implementation, consistency in definitions, alignment with our own findings, and potential for measurement. We combined constructs across published theories that had different labels but were redundant or overlapping in definition, and we parsed apart constructs that conflated underlying concepts. Results The CFIR is composed of five major domains: intervention characteristics, outer setting, inner setting, characteristics of the individuals involved, and the process of implementation. Eight constructs were identified related to the intervention (e.g., evidence strength and quality), four constructs were identified related to outer setting (e.g., patient needs and resources), 12 constructs were identified related to inner setting (e.g., culture, leadership engagement), five constructs were identified related to individual characteristics, and eight constructs were identified related to process (e.g., plan, evaluate, and reflect). We present explicit definitions for each construct. Conclusion The CFIR provides a pragmatic structure for approaching complex, interacting, multi-level, and transient states of constructs in the real world by embracing, consolidating, and unifying key constructs from published implementation theories. It can be used to guide formative evaluations and build the implementation knowledge base across multiple studies and settings. PMID:19664226

  8. Coupled Structural, Thermal, Phase-Change and Electromagnetic Analysis for Superconductors. Volume 1

    NASA Technical Reports Server (NTRS)

    Felippa, C. A.; Farhat, C.; Park, K. C.; Militello, C.; Schuler, J. J.

    1996-01-01

    Described are the theoretical development and computer implementation of reliable and efficient methods for the analysis of coupled mechanical problems that involve the interaction of mechanical, thermal, phase-change and electromagnetic subproblems. The focus application has been the modeling of superconductivity and associated quantum-state phase-change phenomena. In support of this objective the work has addressed the following issues: (1) development of variational principles for finite elements, (2) finite element modeling of the electromagnetic problem, (3) coupling of thermal and mechanical effects, and (4) computer implementation and solution of the superconductivity transition problem. The main accomplishments have been: (1) the development of the theory of parametrized and gauged variational principles, (2) the application of those principled to the construction of electromagnetic, thermal and mechanical finite elements, and (3) the coupling of electromagnetic finite elements with thermal and superconducting effects, and (4) the first detailed finite element simulations of bulk superconductors, in particular the Meissner effect and the nature of the normal conducting boundary layer. The theoretical development is described in two volumes. This volume, Volume 1, describes mostly formulations for specific problems. Volume 2 describes generalization of those formulations.

  9. Protocols for collection of streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data to describe stream quality for the Hydrobiological Monitoring Program, Equus Beds Aquifer Storage and Recovery Program, city of Wichita, Kansas

    USGS Publications Warehouse

    Stone, Mandy L.; Rasmussen, Teresa J.; Bennett, Trudy J.; Poulton, Barry C.; Ziegler, Andrew C.

    2012-01-01

    The city of Wichita, Kansas uses the Equus Beds aquifer, one of two sources, for municipal water supply. To meet future water needs, plans for artificial recharge of the aquifer have been implemented in several phases. Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) Program began with injection of water from the Little Arkansas River into the aquifer for storage and subsequent recovery in 2006. Construction of a river intake structure and surface-water treatment plant began as implementation of Phase II of the Equus Beds ASR Program in 2010. An important aspect of the ASR Program is the monitoring of water quality and the effects of recharge activities on stream conditions. Physical, chemical, and biological data provide the basis for an integrated assessment of stream quality. This report describes protocols for collecting streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data as part of the city of Wichita's hydrobiological monitoring program (HBMP). Following consistent and reliable methods for data collection and processing is imperative for the long-term success of the monitoring program.

  10. Phase field modeling of brittle fracture for enhanced assumed strain shells at large deformations: formulation and finite element implementation

    NASA Astrophysics Data System (ADS)

    Reinoso, J.; Paggi, M.; Linder, C.

    2017-06-01

    Fracture of technological thin-walled components can notably limit the performance of their corresponding engineering systems. With the aim of achieving reliable fracture predictions of thin structures, this work presents a new phase field model of brittle fracture for large deformation analysis of shells relying on a mixed enhanced assumed strain (EAS) formulation. The kinematic description of the shell body is constructed according to the solid shell concept. This enables the use of fully three-dimensional constitutive models for the material. The proposed phase field formulation integrates the use of the (EAS) method to alleviate locking pathologies, especially Poisson thickness and volumetric locking. This technique is further combined with the assumed natural strain method to efficiently derive a locking-free solid shell element. On the computational side, a fully coupled monolithic framework is consistently formulated. Specific details regarding the corresponding finite element formulation and the main aspects associated with its implementation in the general purpose packages FEAP and ABAQUS are addressed. Finally, the applicability of the current strategy is demonstrated through several numerical examples involving different loading conditions, and including linear and nonlinear hyperelastic constitutive models.

  11. The meaning and measurement of implementation climate

    PubMed Central

    2011-01-01

    Background Climate has a long history in organizational studies, but few theoretical models integrate the complex effects of climate during innovation implementation. In 1996, a theoretical model was proposed that organizations could develop a positive climate for implementation by making use of various policies and practices that promote organizational members' means, motives, and opportunities for innovation use. The model proposes that implementation climate--or the extent to which organizational members perceive that innovation use is expected, supported, and rewarded--is positively associated with implementation effectiveness. The implementation climate construct holds significant promise for advancing scientific knowledge about the organizational determinants of innovation implementation. However, the construct has not received sufficient scholarly attention, despite numerous citations in the scientific literature. In this article, we clarify the meaning of implementation climate, discuss several measurement issues, and propose guidelines for empirical study. Discussion Implementation climate differs from constructs such as organizational climate, culture, or context in two important respects: first, it has a strategic focus (implementation), and second, it is innovation-specific. Measuring implementation climate is challenging because the construct operates at the organizational level, but requires the collection of multi-dimensional perceptual data from many expected innovation users within an organization. In order to avoid problems with construct validity, assessments of within-group agreement of implementation climate measures must be carefully considered. Implementation climate implies a high degree of within-group agreement in climate perceptions. However, researchers might find it useful to distinguish implementation climate level (the average of implementation climate perceptions) from implementation climate strength (the variability of implementation climate perceptions). It is important to recognize that the implementation climate construct applies most readily to innovations that require collective, coordinated behavior change by many organizational members both for successful implementation and for realization of anticipated benefits. For innovations that do not possess these attributes, individual-level theories of behavior change could be more useful in explaining implementation effectiveness. Summary This construct has considerable value in implementation science, however, further debate and development is necessary to refine and distinguish the construct for empirical use. PMID:21781328

  12. Scenario Development for the Southwestern United States

    NASA Astrophysics Data System (ADS)

    Mahmoud, M.; Gupta, H.; Stewart, S.; Liu, Y.; Hartmann, H.; Wagener, T.

    2006-12-01

    The primary goal of employing a scenario development approach for the U.S. southwest is to inform regional policy by examining future possibilities related to regional vegetation change, water-leasing, and riparian restoration. This approach is necessary due to a lack of existing explicit water resources application of scenarios to the entire southwest region. A formal approach for scenario development is adopted and applied towards water resources issues within the arid and semi-arid regions of the U.S. southwest following five progressive and reiterative phases: scenario definition, scenario construction, scenario analysis, scenario assessment, and risk management. In the scenario definition phase, the inputs of scientists, modelers, and stakeholders were collected in order to define and construct relevant scenarios to the southwest and its water sustainability needs. From stakeholder-driven scenario workshops and breakout sessions, the three main axes of principal change were identified to be climate change, population development patterns, and quality of information monitoring technology. Based on the extreme and varying conditions of these three main axes, eight scenario narratives were drafted to describe the state of each scenario's respective future and the events which led to it. Events and situations are described within each scenario narrative with respect to key variables; variables that are both important to regional water resources (as distinguished by scientists and modelers), and are good tracking and monitoring indicators of change. The current phase consists of scenario construction, where the drafted scenarios are re-presented to regional scientists and modelers to verify that proper key variables are included (or excluded) from the eight narratives. The next step is to construct the data sets necessary to implement the eight scenarios on the respective computational models of modelers investigating vegetation change, water-leasing, and riparian restoration in the southwest

  13. A historical review of HIV prevention and care initiatives in British Columbia, Canada: 1996-2015

    PubMed Central

    Olding, Michelle; Enns, Ben; Panagiotoglou, Dimitra; Shoveller, Jean; Harrigan, P Richard; Barrios, Rolando; Kerr, Thomas; Montaner, Julio S. G.; Nosyk, Bohdan

    2017-01-01

    Abstract Introduction: British Columbia has made significant progress in the treatment and prevention of HIV since 1996, when Highly Active Antiretroviral Therapy (HAART) became available. However, we currently lack a historical summary of HIV prevention and care interventions implemented in the province since the introduction of HAART and how they have shaped the HIV epidemic. Guided by a socio-ecological framework, we present a historical review of biomedical and health services, community and structural interventions implemented in British Columbia from 1996–2015 to prevent HIV transmission or otherwise enhance the cascade of HIV care. Methods: We constructed a historical timeline of HIV interventions implemented in BC between 1996 and 2015 by reviewing publicly available reports, guidelines and other documents from provincial health agencies, community organizations and AIDS service organizations, and by conducting searches of peer-reviewed literature through PubMed and Ovid MEDLINE. We collected further programmatic information by administering a data collection form to representatives from BC’s regional health authorities and an umbrella agency representing 45 AIDS Service organizations. Using linked population-level health administrative data, we identified key phases of the HIV epidemic in British Columbia, as characterized by distinct changes in HIV incidence, HAART uptake and the provincial HIV response. Results and Discussion: In total, we identified 175 HIV prevention and care interventions implemented in BC from 1996 to 2015. We identify and describe four phases in BC’s response to HIV/AIDS: the early HAART phase (1996–1999); the harm reduction and health service scale-up phase (2000–2005); the early Treatment as Prevention phase (2006–2009); and the STOP HIV/AIDS phase (2010-present). In doing so, we provide an overview of British Columbia’s universal and centralized HIV treatment system and detail the role of community-based and provincial stakeholders in advancing innovative prevention and harm reduction approaches, as well as “seek, test, treat and retain” strategies. Conclusions: The review provides valuable insight into British Columbia’s HIV response, highlights emerging priorities, and may inform future efforts to evaluate the causal impact of interventions. PMID:28953322

  14. Implementation guidance for accelerated bridge construction in South Dakota

    DOT National Transportation Integrated Search

    2017-09-01

    A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...

  15. Protecting quantum memories using coherent parity check codes

    NASA Astrophysics Data System (ADS)

    Roffe, Joschka; Headley, David; Chancellor, Nicholas; Horsman, Dominic; Kendon, Viv

    2018-07-01

    Coherent parity check (CPC) codes are a new framework for the construction of quantum error correction codes that encode multiple qubits per logical block. CPC codes have a canonical structure involving successive rounds of bit and phase parity checks, supplemented by cross-checks to fix the code distance. In this paper, we provide a detailed introduction to CPC codes using conventional quantum circuit notation. We demonstrate the implementation of a CPC code on real hardware, by designing a [[4, 2, 2

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Ulrich F., E-mail: katz@physik.uni-erlangen.de; Collaboration: KM3NeT Collaboration

    KM3NeT is a future research infrastructure in the Mediterranean Sea, hosting a multi-cubic-kilometre neutrino telescope and nodes for Earth and Sea sciences. In this report we shortly summarise the genesis of the KM3NeT project and present key elements of its technical design. The physics objectives of the KM3NeT neutrino telescope and some selected sensitivity estimates are discussed. Finally, some first results from prototype operations and the next steps towards implementation – in particular the first construction phase in 2014/15 – are described.

  17. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... phase activities. The Secretary shall provide the Indian tribe or tribal organization with an opportunity to review the project construction documents at the concept phase, the schematic phase, the design development phase, and the final construction documents phase, or as otherwise negotiated. Upon receipt of...

  18. Biomass power for rural development. Technical progress report, October 1--December 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.« less

  19. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2001-03-01

    The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly amore » basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.« less

  20. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband andmore » bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.« less

  1. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  2. Cargo transportation by airships: a systems study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, C.J.; Dalton, C.

    1976-05-01

    A systems engineering study of a lighter than air airship transportation system was conducted. The feasibility of the use of airships in hauling cargo was demonstrated. Social, legal, environmental and political factors were considered as well as the technical factors necessary to design an effective airship transportation system. In order to accomplish an effective airship transportation program two phases of implementation were recommended. Phase I would involve a fleet of rigid airships of 3.5 million cubic feet displacement capable of carrying 25 tons of cargo internal to the helium-filled gas bag. The Phase I fleet would demonstrate the economic andmore » technical feasibility of modern-day airships while providing a training capability for the construction and operation of larger airships. The Phase II portion would be a fleet of rigid airships of 12 million cubic feet displacement capable of carrying a cargo of 100 tons a distance of 2,000 miles at a cruising speed of 60 mph. An economic analysis is given for a variety of missions for both Phase I and Phase II airships.« less

  3. Prediction of Continuous Cooling Transformation Diagrams for Dual-Phase Steels from the Intercritical Region

    NASA Astrophysics Data System (ADS)

    Colla, V.; Desanctis, M.; Dimatteo, A.; Lovicu, G.; Valentini, R.

    2011-09-01

    The purpose of the present work is the implementation and validation of a model able to predict the microstructure changes and the mechanical properties in the modern high-strength dual-phase steels after the continuous annealing process line (CAPL) and galvanizing (Galv) process. Experimental continuous cooling transformation (CCT) diagrams for 13 differently alloying dual-phase steels were measured by dilatometry from the intercritical range and were used to tune the parameters of the microstructural prediction module of the model. Mechanical properties and microstructural features were measured for more than 400 dual-phase steels simulating the CAPL and Galv industrial process, and the results were used to construct the mechanical model that predicts mechanical properties from microstructural features, chemistry, and process parameters. The model was validated and proved its efficiency in reproducing the transformation kinetic and mechanical properties of dual-phase steels produced by typical industrial process. Although it is limited to the dual-phase grades and chemical compositions explored, this model will constitute a useful tool for the steel industry.

  4. Cargo transportation by airships: A systems study

    NASA Technical Reports Server (NTRS)

    Huang, C. J.; Dalton, C.

    1976-01-01

    A systems engineering study of a lighter than air airship transportation system was conducted. The feasibility of the use of airships in hauling cargo was demonstrated. Social, legal, environmental and political factors were considered as well as the technical factors necessary to design an effective airship transportation system. In order to accomplish an effective airship transportation program two phases of implementation were recommended. Phase I would involve a fleet of rigid airships of 3.5 million cubic feet displacement capable of carrying 25 tons of cargo internal to the helium-filled gas bag. The Phase I fleet would demonstrate the economic and technical feasibility of modern-day airships while providing a training capability for the construction and operation of larger airships. The Phase II portion would be a fleet of rigid airships of 12 million cubic feet displacement capable of carrying a cargo of 100 tons a distance of 2,000 miles at a cruising speed of 60 mph. An economic analysis is given for a variety of missions for both Phase I and Phase II airships.

  5. Environmental Life Cycle Assessment Model for Soil Bioengineering Measures on Infrastructure Slopes

    NASA Astrophysics Data System (ADS)

    Hoerbinger, Stephan; Obriejetan, Michael

    2015-04-01

    Soil bioengineering techniques can be a helpful instrument for civil engineers taking into account not only technical but also ecological, socio-economic and sustainability aspects. Environmental Life Cycle Assessment (LCA) models can serve as supplementary evaluation methods to economic analyses, taking into account the resource demand and environmental burdens of engineering structures. The presented LCA model includes the functional grade of structures in addition to environmental aspects. When using vegetation as living construction material, several factors have to be considered. There is the provision of ecosystem services of plants, such as the stabilization of the slope through its root-system, CO2 sequestration through biomass production et cetera. However, it must be noted that vegetation can cause security issues on infrastructure facilities and entail costs through the necessity of maintenance works. For this reason, it is necessary to already define the target systems during the planning phase of a soil bioengineering structure. In this way, necessary measures can be adapted in all life cycles of a structure. The objective of the presented LCA model is to serve as a basis for the definition of target systems. In the designed LCA model the soil bioengineering structures are divided into four life phases; construction phase, operational phase, end of life phase and subsequent use phase. A main objective of the LCA model is the understanding of the "Cumulative Energy Demand" (CED) and "Global Warming Potential" (GWP) of soil bioengineering structures during all life cycle phases. Additionally, the biomass production and the CO2 sequestration potential of the used plants are regarded as well as the functional integrity of the soil bioengineering system. In the life phase of soil bioengineering structures, a major part of the energy input is required during the construction phase. This is mainly due to the cumulative energy demand of the inert materials used. The principle of biological engineering constructions is based on the combination of dead and living materials and the emerging positive synergistic effects. The dead auxiliaries (stone, wood, etc.) protect the living plants until they undertake technical functions. During the operational phase of the structure, maintenance work has to be done in order to maintain the protective properties of the used plants. Through measures like cutting the vegetation back to the trunk, energy will be put into the system (e.g. through machine use), but will also be put out in form of biomass. Additionally, carbon is sequestered by the biomass production of the plants. The end of life phase is reached after the projected lifetime of a structure. Outside of zones with plant growth restrictions like within a clearance gauge, soil bioengineering approaches are designed to have a subsequent use phase. That means, that after the actual lifespan of the construction, a forest should have developed and maintain its balance by natural succession. The LCA model aims at supporting sustainable management strategies for CED and GWP as a base for Green Public Procurement and eco- friendly implementation and maintenance of soil bioengineering structures on infrastructure slopes.

  6. Renovating and Reconstructing in Phases--Specifying Phased Construction.

    ERIC Educational Resources Information Center

    Bunzick, John

    2002-01-01

    Discusses planning for phased school construction projects, including effects on occupancy (for example, construction adjacent to occupied space, construction procedure safety zones near occupied areas, and code-complying means of egress), effects on building systems (such as heating and cooling equipment and power distribution), and contract…

  7. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  8. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  9. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  10. Vaccum Gas Tungsten Arc Welding, phase 1

    NASA Astrophysics Data System (ADS)

    Weeks, J. L.; Krotz, P. D.; Todd, D. T.; Liaw, Y. K.

    1995-03-01

    This two year program will investigate Vacuum Gas Tungsten Arc Welding (VGTAW) as a method to modify or improve the weldability of normally difficult-to-weld materials. VGTAW appears to offer a significant improvement in weldability because of the clean environment and lower heat input needed. The overall objective of the program is to develop the VGTAW technology and implement it into a manufacturing environment that will result in lower cost, better quality and higher reliability aerospace components for the space shuttle and other NASA space systems. Phase 1 of this program was aimed at demonstrating the process's ability to weld normally difficult-to-weld materials. Phase 2 will focus on further evaluation, a hardware demonstration and a plan to implement VGTAW technology into a manufacturing environment. During Phase 1, the following tasks were performed: (1) Task 11000 Facility Modification - an existing vacuum chamber was modified and adapted to a GTAW power supply; (2) Task 12000 Materials Selection - four difficult-to-weld materials typically used in the construction of aerospace hardware were chosen for study; (3) Task 13000 VGTAW Experiments - welding experiments were conducted under vacuum using the hollow tungsten electrode and evaluation. As a result of this effort, two materials, NARloy Z and Incoloy 903, were downselected for further characterization in Phase 2; and (4) Task 13100 Aluminum-Lithium Weld Studies - this task was added to the original work statement to investigate the effects of vacuum welding and weld pool vibration on aluminum-lithium alloys.

  11. Vaccum Gas Tungsten Arc Welding, phase 1

    NASA Technical Reports Server (NTRS)

    Weeks, J. L.; Krotz, P. D.; Todd, D. T.; Liaw, Y. K.

    1995-01-01

    This two year program will investigate Vacuum Gas Tungsten Arc Welding (VGTAW) as a method to modify or improve the weldability of normally difficult-to-weld materials. VGTAW appears to offer a significant improvement in weldability because of the clean environment and lower heat input needed. The overall objective of the program is to develop the VGTAW technology and implement it into a manufacturing environment that will result in lower cost, better quality and higher reliability aerospace components for the space shuttle and other NASA space systems. Phase 1 of this program was aimed at demonstrating the process's ability to weld normally difficult-to-weld materials. Phase 2 will focus on further evaluation, a hardware demonstration and a plan to implement VGTAW technology into a manufacturing environment. During Phase 1, the following tasks were performed: (1) Task 11000 Facility Modification - an existing vacuum chamber was modified and adapted to a GTAW power supply; (2) Task 12000 Materials Selection - four difficult-to-weld materials typically used in the construction of aerospace hardware were chosen for study; (3) Task 13000 VGTAW Experiments - welding experiments were conducted under vacuum using the hollow tungsten electrode and evaluation. As a result of this effort, two materials, NARloy Z and Incoloy 903, were downselected for further characterization in Phase 2; and (4) Task 13100 Aluminum-Lithium Weld Studies - this task was added to the original work statement to investigate the effects of vacuum welding and weld pool vibration on aluminum-lithium alloys.

  12. A remark on the GNSS single difference model with common clock scheme for attitude determination

    NASA Astrophysics Data System (ADS)

    Chen, Wantong

    2016-09-01

    GNSS-based attitude determination technique is an important field of study, in which two schemes can be used to construct the actual system: the common clock scheme and the non-common clock scheme. Compared with the non-common clock scheme, the common clock scheme can strongly improve both the reliability and the accuracy. However, in order to gain these advantages, specific care must be taken in the implementation. The cares are thus discussed, based on the generating technique of carrier phase measurement in GNSS receivers. A qualitative assessment of potential phase bias contributes is also carried out. Possible technical difficulties are pointed out for the development of single-board multi-antenna GNSS attitude systems with a common clock.

  13. High-speed polarization sensitive optical coherence tomography for retinal diagnostics

    NASA Astrophysics Data System (ADS)

    Yin, Biwei; Wang, Bingqing; Vemishetty, Kalyanramu; Nagle, Jim; Liu, Shuang; Wang, Tianyi; Rylander, Henry G., III; Milner, Thomas E.

    2012-01-01

    We report design and construction of an FPGA-based high-speed swept-source polarization-sensitive optical coherence tomography (SS-PS-OCT) system for clinical retinal imaging. Clinical application of the SS-PS-OCT system is accurate measurement and display of thickness, phase retardation and birefringence maps of the retinal nerve fiber layer (RNFL) in human subjects for early detection of glaucoma. The FPGA-based SS-PS-OCT system provides three incident polarization states on the eye and uses a bulk-optic polarization sensitive balanced detection module to record two orthogonal interference fringe signals. Interference fringe signals and relative phase retardation between two orthogonal polarization states are used to obtain Stokes vectors of light returning from each RNFL depth. We implement a Levenberg-Marquardt algorithm on a Field Programmable Gate Array (FPGA) to compute accurate phase retardation and birefringence maps. For each retinal scan, a three-state Levenberg-Marquardt nonlinear algorithm is applied to 360 clusters each consisting of 100 A-scans to determine accurate maps of phase retardation and birefringence in less than 1 second after patient measurement allowing real-time clinical imaging-a speedup of more than 300 times over previous implementations. We report application of the FPGA-based SS-PS-OCT system for real-time clinical imaging of patients enrolled in a clinical study at the Eye Institute of Austin and Duke Eye Center.

  14. Using Teamcenter engineering software for a successive punching tool lifecycle management

    NASA Astrophysics Data System (ADS)

    Blaga, F.; Pele, A.-V.; Stǎnǎşel, I.; Buidoş, T.; Hule, V.

    2015-11-01

    The paper presents studies and researches results of the implementation of Teamcenter (TC) integrated management of a product lifecycle, in a virtual enterprise. The results are able to be implemented also in a real enterprise. The product was considered a successive punching and cutting tool, designed to materialize a metal sheet part. The paper defines the technical documentation flow (flow of information) in the process of constructive computer aided design of the tool. After the design phase is completed a list of parts is generated containing standard or manufactured components (BOM, Bill of Materials). The BOM may be exported to MS Excel (.xls) format and can be transferred to other departments of the company in order to supply the necessary materials and resources to achieve the final product. This paper describes the procedure to modify or change certain dimensions of sheet metal part obtained by punching. After 3D and 2D design, the digital prototype of punching tool moves to following lifecycle phase of the manufacturing process. For each operation of the technological process the corresponding phases are described in detail. Teamcenter enables to describe manufacturing company structure, underlying workstations that carry out various operations of manufacturing process. The paper revealed that the implementation of Teamcenter PDM in a company, improves efficiency of managing product information, eliminating time working with search, verification and correction of documentation, while ensuring the uniqueness and completeness of the product data.

  15. Implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction

    NASA Astrophysics Data System (ADS)

    Orlov, Alexandr K.

    2017-10-01

    The article deals with the application of sustainable construction concept within implementation of megaprojects of tourist clusters development using energy saving technologies. The concept of sustainable construction includes the elements of green construction, energy management as well as aspects of the economic efficiency of construction projects implementation. The methodical approach to the implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction is proved. The conceptual approach to the evaluation of the ecological, social and economic components of the integral indicator of the effectiveness of the megaproject for the development of the tourist cluster is provided. The algorithm for estimation of the efficiency of innovative solutions in green construction is considered.

  16. Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  17. Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  18. BWR Servicing and Refueling Improvement Program: Phase I summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perry, D.R.

    1978-09-01

    Under the U.S. Department of Energy sponsorship, General Electric Co. (GE) undertook a study of boiling water reactor (BWR) refueling outages for the purpose of recommending the development and demonstration of critical path time savings improvements. The Tennessee Valley Authority (TVA) joined the study as a subcontractor, providing monitoring assistance and making the Browns Ferry Site available for improvement demonstrations. Agreement was also reached with Georgia Power Co., Power Authority of the State of New York, and Commonwealth Edison Co. for monitoring and data collection at Hatch 1, FitzPatrick, and Quad Cities 1 nuclear plants, respectively. The objective was tomore » identify, develop, and demonstrate improved refueling, maintenance, and inspection procedures and equipment. The improvements recommended in this study are applicable to BWR nuclear plants currently in operation as well as those in the design and construction phases. The recommendations and outage information can be used as a basis to plan and conduct the first outages of new plants and to improve the planning and facilities of currently operating plants. Many of the recommendations can readily be incorporated in plants currently in the design and construction phases as well as in the design of future plants. Many of these recommended improvements can be implemented immediately by utilities without further technical development.« less

  19. Orthogonal cutting modeling of hybrid CFRP/Ti toward specific cutting energy and induced damage analyses

    NASA Astrophysics Data System (ADS)

    Xu, Jinyang; El Mansori, Mohamed

    2016-10-01

    This paper studied the machinability of hybrid CFRP/Ti stack via the numerical approach. To this aim, an original FE model consisting of three fundamental physical constituents, i.e., CFRP phase, interface and Ti phase, was established in the Abaqus Explicit/code to construct the machining behavior of the composite-to-metal alliance. The CFRP phase was modeled as an equivalent homogeneous material (EHM) by considering its anisotropic behavior relative to the fiber orientation (θ) while the Ti alloy phase was assumed to exhibit isotropic and elastic-plastic behavior. The "interface" linking the "CFRP-to-Ti" contact boundary was physically modeled as an intermediate transition region through the concept of cohesive zone (CZ). Different constitutive laws and damage criteria were implemented to simulate the chip separation process of the bi-material system. The key cutting responses including specific cutting energy consumption, induced subsurface damage, and interface delamination were precisely addressed via the comprehensive FE analyses, and several key conclusions were drawn from this study.

  20. The effectiveness of environmental strategies on noise reduction in a pediatric intensive care unit: creation of single-patient bedrooms and reducing noise sources.

    PubMed

    Kol, Emine; Aydın, Perihan; Dursun, Oguz

    2015-07-01

    Noise is a substantial problem for both patients and healthcare workers in hospitals. This study aimed to determine the effectiveness of environmental strategies (creating single-patient rooms and reducing noise sources) in noise reduction in a pediatric intensive care unit. Noise measurement in the unit was conducted in two phases. In the first phase, measurements aimed at determining the unit's present level of noise were performed over 4 weeks in December 2013. During the month following the first measurement phase, the intensive care unit (ICU) was moved to a new location and noise-reducing strategies were implemented. The second phase, in May 2014, measured noise levels in the newly constructed environment. The noise levels before and after environmental changes were statistically significant at 72.6 dB-A and 56 dB-A, respectively (p < .05). Single-patient rooms and noise-reducing strategies can be effective in controlling environmental noise in the ICU. © 2015, Wiley Periodicals, Inc.

  1. Spacecraft Multiple Array Communication System Performance Analysis

    NASA Technical Reports Server (NTRS)

    Hwu, Shian U.; Desilva, Kanishka; Sham, Catherine C.

    2010-01-01

    The Communication Systems Simulation Laboratory (CSSL) at the NASA Johnson Space Center is tasked to perform spacecraft and ground network communication system simulations, design validation, and performance verification. The CSSL has developed simulation tools that model spacecraft communication systems and the space and ground environment in which the tools operate. In this paper, a spacecraft communication system with multiple arrays is simulated. Multiple array combined technique is used to increase the radio frequency coverage and data rate performance. The technique is to achieve phase coherence among the phased arrays to combine the signals at the targeting receiver constructively. There are many technical challenges in spacecraft integration with a high transmit power communication system. The array combining technique can improve the communication system data rate and coverage performances without increasing the system transmit power requirements. Example simulation results indicate significant performance improvement can be achieved with phase coherence implementation.

  2. Entropy for quantum pure states and quantum H theorem

    NASA Astrophysics Data System (ADS)

    Han, Xizhi; Wu, Biao

    2015-06-01

    We construct a complete set of Wannier functions that are localized at both given positions and momenta. This allows us to introduce the quantum phase space, onto which a quantum pure state can be mapped unitarily. Using its probability distribution in quantum phase space, we define an entropy for a quantum pure state. We prove an inequality regarding the long-time behavior of our entropy's fluctuation. For a typical initial state, this inequality indicates that our entropy can relax dynamically to a maximized value and stay there most of time with small fluctuations. This result echoes the quantum H theorem proved by von Neumann [Zeitschrift für Physik 57, 30 (1929), 10.1007/BF01339852]. Our entropy is different from the standard von Neumann entropy, which is always zero for quantum pure states. According to our definition, a system always has bigger entropy than its subsystem even when the system is described by a pure state. As the construction of the Wannier basis can be implemented numerically, the dynamical evolution of our entropy is illustrated with an example.

  3. Minimum entropy deconvolution optimized sinusoidal synthesis and its application to vibration based fault detection

    NASA Astrophysics Data System (ADS)

    Li, Gang; Zhao, Qing

    2017-03-01

    In this paper, a minimum entropy deconvolution based sinusoidal synthesis (MEDSS) filter is proposed to improve the fault detection performance of the regular sinusoidal synthesis (SS) method. The SS filter is an efficient linear predictor that exploits the frequency properties during model construction. The phase information of the harmonic components is not used in the regular SS filter. However, the phase relationships are important in differentiating noise from characteristic impulsive fault signatures. Therefore, in this work, the minimum entropy deconvolution (MED) technique is used to optimize the SS filter during the model construction process. A time-weighted-error Kalman filter is used to estimate the MEDSS model parameters adaptively. Three simulation examples and a practical application case study are provided to illustrate the effectiveness of the proposed method. The regular SS method and the autoregressive MED (ARMED) method are also implemented for comparison. The MEDSS model has demonstrated superior performance compared to the regular SS method and it also shows comparable or better performance with much less computational intensity than the ARMED method.

  4. 77 FR 37248 - Delegations of Authority for the Office of Housing-Federal Housing Administration (FHA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...

  5. Cutting Modeling of Hybrid CFRP/Ti Composite with Induced Damage Analysis

    PubMed Central

    Xu, Jinyang; El Mansori, Mohamed

    2016-01-01

    In hybrid carbon fiber reinforced polymer (CFRP)/Ti machining, the bi-material interface is the weakest region vulnerable to severe damage formation when the tool cutting from one phase to another phase and vice versa. The interface delamination as well as the composite-phase damage is the most serious failure dominating the bi-material machining. In this paper, an original finite element (FE) model was developed to inspect the key mechanisms governing the induced damage formation when cutting this multi-phase material. The hybrid composite model was constructed by establishing three disparate physical constituents, i.e., the Ti phase, the interface, and the CFRP phase. Different constitutive laws and damage criteria were implemented to build up the entire cutting behavior of the bi-material system. The developed orthogonal cutting (OC) model aims to characterize the dynamic mechanisms of interface delamination formation and the affected interface zone (AIZ). Special focus was made on the quantitative analyses of the parametric effects on the interface delamination and composite-phase damage. The numerical results highlighted the pivotal role of AIZ in affecting the formation of interface delamination, and the significant impacts of feed rate and cutting speed on delamination extent and fiber/matrix failure. PMID:28787824

  6. Using the Consolidated Framework for Implementation Research to Identify Barriers and Facilitators for the Implementation of an Internet-Based Patient-Provider Communication Service in Five Settings: A Qualitative Study

    PubMed Central

    Varsi, Cecilie; Ekstedt, Mirjam; Gammon, Deede

    2015-01-01

    Background Although there is growing evidence of the positive effects of Internet-based patient-provider communication (IPPC) services for both patients and health care providers, their implementation into clinical practice continues to be a challenge. Objective The 3 aims of this study were to (1) identify and compare barriers and facilitators influencing the implementation of an IPPC service in 5 hospital units using the Consolidated Framework for Implementation Research (CFIR), (2) assess the ability of the different constructs of CFIR to distinguish between high and low implementation success, and (3) compare our findings with those from other studies that used the CFIR to discriminate between high and low implementation success. Methods This study was based on individual interviews with 10 nurses, 6 physicians, and 1 nutritionist who had used the IPPC to answer messages from patients. Results Of the 36 CFIR constructs, 28 were addressed in the interviews, of which 12 distinguished between high and low implementation units. Most of the distinguishing constructs were related to the inner setting domain of CFIR, indicating that institutional factors were particularly important for successful implementation. Health care providers’ beliefs in the intervention as useful for themselves and their patients as well as the implementation process itself were also important. A comparison of constructs across ours and 2 other studies that also used the CFIR to discriminate between high and low implementation success showed that 24 CFIR constructs distinguished between high and low implementation units in at least 1 study; 11 constructs distinguished in 2 studies. However, only 2 constructs (patient need and resources and available resources) distinguished consistently between high and low implementation units in all 3 studies. Conclusions The CFIR is a helpful framework for illuminating barriers and facilitators influencing IPPC implementation. However, CFIR’s strength of being broad and comprehensive also limits its usefulness as an implementation framework because it does not discriminate between the relative importance of its many constructs for implementation success. This is the first study to identify which CFIR constructs are the most promising to distinguish between high and low implementation success across settings and interventions. Findings from this study can contribute to the refinement of CFIR toward a more succinct and parsimonious framework for planning and evaluation of the implementation of clinical interventions. ClinicalTrial Clinicaltrials.gov NCT00971139; http://clinicaltrial.gov/ct2/show/NCT00971139 (Archived by WebCite at http://www.webcitation.org/6cWeqN1uY) PMID:26582138

  7. Effective field theory in the harmonic oscillator basis

    DOE PAGES

    Binder, S.; Ekström, Jan A.; Hagen, Gaute; ...

    2016-04-25

    In this paper, we develop interactions from chiral effective field theory (EFT) that are tailored to the harmonic oscillator basis. As a consequence, ultraviolet convergence with respect to the model space is implemented by construction and infrared convergence can be achieved by enlarging the model space for the kinetic energy. In oscillator EFT, matrix elements of EFTs formulated for continuous momenta are evaluated at the discrete momenta that stem from the diagonalization of the kinetic energy in the finite oscillator space. By fitting to realistic phase shifts and deuteron data we construct an effective interaction from chiral EFT at next-to-leadingmore » order. Finally, many-body coupled-cluster calculations of nuclei up to 132Sn converge fast for the ground-state energies and radii in feasible model spaces.« less

  8. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    NASA Astrophysics Data System (ADS)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  9. Wave packet interferometry and quantum state reconstruction by acousto-optic phase modulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tekavec, Patrick F.; Dyke, Thomas R.; Marcus, Andrew H.

    2006-11-21

    Studies of wave packet dynamics often involve phase-selective measurements of coherent optical signals generated from sequences of ultrashort laser pulses. In wave packet interferometry (WPI), the separation between the temporal envelopes of the pulses must be precisely monitored or maintained. Here we introduce a new (and easy to implement) experimental scheme for phase-selective measurements that combines acousto-optic phase modulation with ultrashort laser excitation to produce an intensity-modulated fluorescence signal. Synchronous detection, with respect to an appropriately constructed reference, allows the signal to be simultaneously measured at two phases differing by 90 deg. Our method effectively decouples the relative temporal phasemore » from the pulse envelopes of a collinear train of optical pulse pairs. We thus achieve a robust and high signal-to-noise scheme for WPI applications, such as quantum state reconstruction and electronic spectroscopy. The validity of the method is demonstrated, and state reconstruction is performed, on a model quantum system - atomic Rb vapor. Moreover, we show that our measurements recover the correct separation between the absorptive and dispersive contributions to the system susceptibility.« less

  10. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  11. Managers' use of nursing workforce planning and deployment technologies: protocol for a realist synthesis of implementation and impact.

    PubMed

    Burton, Christopher; Rycroft-Malone, Jo; Williams, Lynne; Davies, Siân; McBride, Anne; Hall, Beth; Rowlands, Anne-M; Jones, Adrian

    2016-08-26

    Nursing staffing levels in hospitals appear to be associated with improved patient outcomes. National guidance indicates that the triangulation of information from workforce planning and deployment technologies (WPTs; eg, the Safer Nursing Care Tool) and 'local knowledge' is important for managers to achieve appropriate staffing levels for better patient outcomes. Although WPTs provide managers with predictive information about future staffing requirements, ensuring patient safety and quality care also requires the consideration of information from other sources in real time. Yet little attention has been given to how to support managers to implement WPTs in practice. Given this lack of understanding, this evidence synthesis is designed to address the research question: managers' use of WPTs and their impacts on nurse staffing and patient care: what works, for whom, how and in what circumstances? To explain how WPTs may work and in what contexts, we will conduct a realist evidence synthesis through sourcing relevant evidence, and consulting with stakeholders about the impacts of WPTs on health and relevant public service fields. The review will be in 4 phases over 18 months. Phase 1: we will construct an initial theoretical framework that provides plausible explanations of what works about WPTs. Phase 2: evidence retrieval, review and synthesis guided by the theoretical framework; phase 3: testing and refining of programme theories, to determine their relevance; phase 4: formulating actionable recommendations about how WPTs should be implemented in clinical practice. Ethical approval has been gained from the study's institutional sponsors. Ethical review from the National Health Service (NHS) is not required; however research and development permissions will be obtained. Findings will be disseminated through stakeholder engagement and knowledge mobilisation activities. The synthesis will develop an explanatory programme theory of the implementation and impact of nursing WPTs, and practical guidance for nurse managers. CRD42016038132. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  12. E-consult implementation: lessons learned using consolidated framework for implementation research.

    PubMed

    Haverhals, Leah M; Sayre, George; Helfrich, Christian D; Battaglia, Catherine; Aron, David; Stevenson, Lauren D; Kirsh, Susan; Ho, Michael; Lowery, Julie

    2015-12-01

    In 2011, the Veterans Health Administration (VHA) implemented electronic consults (e-consults) as an alternative to in-person specialty visits to improve access and reduce travel for veterans. We conducted an evaluation to understand variation in the use of the new e-consult mechanism and the causes of variable implementation, guided by the Consolidated Framework for Implementation Research (CFIR). Qualitative case studies of 3 high- and 5 low-implementation e-consult pilot sites. Participants included e-consult site leaders, primary care providers, specialists, and support staff identified using a modified snowball sample. We used a 3-step approach, with a structured survey of e-consult site leaders to identify key constructs, based on the CFIR. We then conducted open-ended interviews, focused on key constructs, with all participants. Finally, we produced structured, site-level ratings of CFIR constructs and compared them between high- and low-implementation sites. Site leaders identified 14 initial constructs. We conducted 37 interviews, from which 4 CFIR constructs distinguished high implementation e-consult sites: compatibility, networks and communications, training, and access to knowledge and information. For example, illustrating compatibility, a specialist at a high-implementation site reported that the site changed the order of consult options so that all specialties listed e-consults first to maintain consistency. High-implementation sites also exhibited greater agreement on constructs. By using the CFIR to analyze results, we facilitate future synthesis with other findings, and we better identify common patterns of implementation determinants common across settings.

  13. Barriers of lean construction implementation in the Moroccan construction industry

    NASA Astrophysics Data System (ADS)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  14. Introduction to the HL-LHC Project

    NASA Astrophysics Data System (ADS)

    Rossi, L.; Brüning, O.

    The Large Hadron Collider (LHC) is one of largest scientific instruments ever built. It has been exploring the new energy frontier since 2010, gathering a global user community of 7,000 scientists. To extend its discovery potential, the LHC will need a major upgrade in the 2020s to increase its luminosity (rate of collisions) by a factor of five beyond its design value and the integrated luminosity by a factor of ten. As a highly complex and optimized machine, such an upgrade of the LHC must be carefully studied and requires about ten years to implement. The novel machine configuration, called High Luminosity LHC (HL-LHC), will rely on a number of key innovative technologies, representing exceptional technological challenges, such as cutting-edge 11-12 tesla superconducting magnets, very compact superconducting cavities for beam rotation with ultra-precise phase control, new technology for beam collimation and 300-meter-long high-power superconducting links with negligible energy dissipation. HL-LHC federates efforts and R&D of a large community in Europe, in the US and in Japan, which will facilitate the implementation of the construction phase as a global project.

  15. Measuring factors affecting implementation of health innovations: a systematic review of structural, organizational, provider, patient, and innovation level measures

    PubMed Central

    2013-01-01

    Background Two of the current methodological barriers to implementation science efforts are the lack of agreement regarding constructs hypothesized to affect implementation success and identifiable measures of these constructs. In order to address these gaps, the main goals of this paper were to identify a multi-level framework that captures the predominant factors that impact implementation outcomes, conduct a systematic review of available measures assessing constructs subsumed within these primary factors, and determine the criterion validity of these measures in the search articles. Method We conducted a systematic literature review to identify articles reporting the use or development of measures designed to assess constructs that predict the implementation of evidence-based health innovations. Articles published through 12 August 2012 were identified through MEDLINE, CINAHL, PsycINFO and the journal Implementation Science. We then utilized a modified five-factor framework in order to code whether each measure contained items that assess constructs representing structural, organizational, provider, patient, and innovation level factors. Further, we coded the criterion validity of each measure within the search articles obtained. Results Our review identified 62 measures. Results indicate that organization, provider, and innovation-level constructs have the greatest number of measures available for use, whereas structural and patient-level constructs have the least. Additionally, relatively few measures demonstrated criterion validity, or reliable association with an implementation outcome (e.g., fidelity). Discussion In light of these findings, our discussion centers on strategies that researchers can utilize in order to identify, adapt, and improve extant measures for use in their own implementation research. In total, our literature review and resulting measures compendium increases the capacity of researchers to conceptualize and measure implementation-related constructs in their ongoing and future research. PMID:23414420

  16. Advanced ballistic range technology

    NASA Technical Reports Server (NTRS)

    Yates, Leslie A.

    1994-01-01

    The research conducted supported two facilities at NASA Ames Research Center: the Hypervelocity Free-Flight Aerodynamic Facility and the 16-Inch Shock Tunnel. During the grant period, a computerized film-reading system was developed, and five- and six-degree-of-freedom parameter-identification routines were written and successfully implemented. Studies of flow separation were conducted, and methods to extract phase shift information from finite-fringe interferograms were developed. Methods for constructing optical images from Computational Fluid Dynamics solutions were also developed, and these methods were used for one-to-one comparisons of experiment and computations.

  17. Development towards a fast ion loss detector for the reversed field pinch.

    PubMed

    Bonofiglo, P J; Anderson, J K; Almagri, A F; Kim, J; Clark, J; Capecchi, W; Sears, S H; Egedal, J

    2016-11-01

    A fast ion loss detector has been constructed and implemented on the Madison Symmetric Torus (MST) to investigate energetic ion losses and transport due to energetic particle and MHD instabilities. The detector discriminates particle orbits solely on pitch and consists of two thin-foil, particle collecting plates that are symmetric with respect to the device aperture. One plate collects fast ion signal, while the second aids in the minimization of background and noise effects. Initial measurements are reported along with suggestions for the next design phase of the detector.

  18. Knowledge, attitude and practices for design for safety: A study on civil & structural engineers.

    PubMed

    Goh, Yang Miang; Chua, Sijie

    2016-08-01

    Design for safety (DfS) (also known as prevention through design, safe design and Construction (Design and Management)) promotes early consideration of safety and health hazards during the design phase of a construction project. With early intervention, hazards can be more effectively eliminated or controlled leading to safer worksites and construction processes. DfS is practiced in many countries, including Australia, the UK, and Singapore. In Singapore, the Manpower Ministry enacted the DfS Regulations in July 2015, which will be enforced from August 2016 onwards. Due to the critical role of civil and structural (C&S) engineers during design and construction, the DfS knowledge, attitude and practices (KAP) of C&S engineers have significant impact on the successful implementation of DfS. Thus, this study aims to explore the DfS KAP of C&S engineers so as to guide further research in measuring and improving DfS KAP of designers. During the study, it was found that there is a lack of KAP studies in construction management. Therefore, this study also aims to provide useful lessons for future applications of the KAP framework in construction management research. A questionnaire was developed to assess the DfS KAP of C&S engineers. The responses provided by 43 C&S engineers were analyzed. In addition, interviews with experienced construction professionals were carried out to further understand perceptions of DfS and related issues. The results suggest that C&S engineers are supportive of DfS, but the level of DfS knowledge and practices need to be improved. More DfS guidelines and training should be made available to the engineers. To ensure that DfS can be implemented successfully, there is a need to study the contractual arrangements between clients and designers and the effectiveness of different implementation approaches for the DfS process. The questionnaire and findings in this study provided the foundation for a baseline survey with larger sample size, which is currently being planned. In contrast to earlier studies, the study showed that the responding C&S engineers were supportive of the DfS. The study showed that the key to improving the DfS KAP of C&S engineers is by improving clients' motivation for DfS. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Unit soil loss rate from various construction sites during a storm.

    PubMed

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  20. A High Voltage Asymmetric Waveform Generator for FAIMS

    PubMed Central

    Canterbury, Jesse D.; Gladden, James; Buck, Lon; Olund, Roy; MacCoss, Michael J.

    2010-01-01

    High field asymmetric waveform ion mobility spectrometry (FAIMS) has been used increasingly in recent years as an additional method of ion separation and selection prior to mass spectrometry. The FAIMS electrodes are relatively simple to design and fabricate for laboratories wishing to implement their own FAIMS designs. However, construction of the electronics apparatus needed to produce the required high magnitude asymmetric electric field oscillating at a frequency of several hundred kilohertz is not trivial. Here we present an entirely custom-built electronics setup capable of supplying the required waveforms and voltages. The apparatus is relatively simple and inexpensive to implement. We also present data acquired on this system demonstrating the use of FAIMS as a gas phase ion filter interface to an ion trap mass spectrometer. PMID:20332067

  1. Towards Core Modelling Practices in Integrated Water Resource Management: An Interdisciplinary View of the Modelling Process

    NASA Astrophysics Data System (ADS)

    Jakeman, A. J.; Elsawah, S.; Pierce, S. A.; Ames, D. P.

    2016-12-01

    The National Socio-Environmental Synthesis Center (SESYNC) Core Modelling Practices Pursuit is developing resources to describe core practices for developing and using models to support integrated water resource management. These practices implement specific steps in the modelling process with an interdisciplinary perspective; however, the particular practice that is most appropriate depends on contextual aspects specific to the project. The first task of the pursuit is to identify the various steps for which implementation practices are to be described. This paper reports on those results. The paper draws on knowledge from the modelling process literature for environmental modelling (Jakeman et al., 2006), engaging stakeholders (Voinov and Bousquet, 2010) and general modelling (Banks, 1999), as well as the experience of the consortium members. We organise the steps around the four modelling phases. The planning phase identifies what is to be achieved, how and with what resources. The model is built and tested during the construction phase, and then used in the application phase. Finally, models that become part of the ongoing policy process require a maintenance phase. For each step, the paper focusses on what is to be considered or achieved, rather than how it is performed. This reflects the separation of the steps from the practices that implement them in different contexts. We support description of steps with a wide range of examples. Examples are designed to be generic and do not reflect any one project or context, but instead are drawn from common situations or from extremely different ones so as to highlight some of the issues that may arise at each step. References Banks, J. (1999). Introduction to simulation. In Proceedings of the 1999 Winter Simulation Conference. Jakeman, A. J., R. A. Letcher, and J. P. Norton (2006). Ten iterative steps in development and evaluation of environmental models. Environmental Modelling and Software 21, 602-614. Voinov, A. and F. Bousquet (2010). Modelling with stakeholders. Environmental Modelling & Software 25 (11), 1268-1281.

  2. Phase and widening construction of steel bridges.

    DOT National Transportation Integrated Search

    2014-03-01

    Phase construction is used to maintain traffic without interruption and generally refers to sequenced construction where a portion of the bridge is under construction while the remainder continues to carry traffic. The method typically results in two...

  3. [Quantitative assessment of fungal risk in the case of construction works in healthcare establishments: Proposed indicators for the determination of the impact of management precautions on the risk of fungal infection].

    PubMed

    Gangneux, J-P; Adjidé, C-C; Bernard, L; Botterel, F; Carel, A; Castel, O; Derouin, F; Hoarau, G; Labussière, H; Lafaurie, M; Millon, L; Pottecher, B; Thiebaut, A; Turco, M; Baron, R

    2012-03-01

    Construction works in healthcare establishments produce airborne fungal spores and considerably increase the risk of exposure of immunosuppressed patients. It is necessary to reinforce protective measures, or even to implement specific precautions, during this critical phase. The aim of these precautions is to protect both those areas, which are susceptible to dust, and patients at risk of a fungal infection particularly invasive aspergillosis. When construction works are planned in healthcare establishments, the first step consists in the characterisation of the environmental fungal risk and the second one in proposing risk management methods. It is then essential to establish impact indicators in order to evaluate the risk management precautions applied. The working group promoted by the French societies of medical mycology and hospital hygiene (SFMM & SF2H) details here both environmental and epidemiological impact indicators that can be used. Copyright © 2012. Published by Elsevier SAS.

  4. A Paradigm Shift in the Implementation of Ethics Codes in Construction Organizations in Hong Kong: Towards an Ethical Behaviour.

    PubMed

    Ho, Christabel Man-Fong; Oladinrin, Olugbenga Timo

    2018-01-30

    Due to the economic globalization which is characterized with business scandals, scholars and practitioners are increasingly engaged with the implementation of codes of ethics as a regulatory mechanism for stimulating ethical behaviours within an organization. The aim of this study is to examine various organizational practices regarding the effective implementation of codes of ethics within construction contracting companies. Views on ethics management in construction organizations together with the recommendations for improvement were gleaned through 19 semi-structured interviews, involving construction practitioners from various construction companies in Hong Kong. The findings suggested some practices for effective implementation of codes of ethics in order to diffuse ethical behaviours in an organizational setting which include; introduction of effective reward schemes, arrangement of ethics training for employees, and leadership responsiveness to reported wrongdoings. Since most of the construction companies in Hong Kong have codes of ethics, emphasis is made on the practical implementation of codes within the organizations. Hence, implications were drawn from the recommended measures to guide construction companies and policy makers.

  5. On the concept of cryptographic quantum hashing

    NASA Astrophysics Data System (ADS)

    Ablayev, F.; Ablayev, M.

    2015-12-01

    In the letter we define the notion of a quantum resistant ((ε ,δ ) -resistant) hash function which consists of a combination of pre-image (one-way) resistance (ε-resistance) and collision resistance (δ-resistance) properties. We present examples and discussion that supports the idea of quantum hashing. We present an explicit quantum hash function which is ‘balanced’, one-way resistant and collision resistant and demonstrate how to build a large family of quantum hash functions. Balanced quantum hash functions need a high degree of entanglement between the qubits. We use a phase transformation technique to express quantum hashing constructions, which is an effective way of mapping hash states to coherent states in a superposition of time-bin modes. The phase transformation technique is ready to be implemented with current optical technology.

  6. Implementation of building information modeling in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Memon, Aftab Hameed; Rahman, Ismail Abdul; Harman, Nur Melly Edora

    2014-10-01

    This study has assessed the implementation level of Building Information Modeling (BIM) in the construction industry of Malaysia. It also investigated several computer software packages facilitating BIM and challenges affecting its implementation. Data collection for this study was carried out using questionnaire survey among the construction practitioners. 95 completed forms of questionnaire received against 150 distributed questionnaire sets from consultant, contractor and client organizations were analyzed statistically. Analysis findings indicated that the level of implementation of BIM in the construction industry of Malaysia is very low. Average index method employed to assess the effectiveness of various software packages of BIM highlighted that Bentley construction, AutoCAD and ArchiCAD are three most popular and effective software packages. Major challenges to BIM implementation are it requires enhanced collaboration, add work to a designer, interoperability and needs enhanced collaboration. For improving the level of implementing BIM in Malaysian industry, it is recommended that a flexible training program of BIM for all practitioners must be created.

  7. Hualapai Tribal Utility Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hualapai Tribal Nation

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central powermore » grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.« less

  8. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  9. Harnessing Implementation Science to Increase the Impact of Health Equity Research.

    PubMed

    Chinman, Matthew; Woodward, Eva N; Curran, Geoffrey M; Hausmann, Leslie R M

    2017-09-01

    Health disparities are differences in health or health care between groups based on social, economic, and/or environmental disadvantage. Disparity research often follows 3 steps: detecting (phase 1), understanding (phase 2), and reducing (phase 3), disparities. Although disparities have narrowed over time, many remain. We argue that implementation science could enhance disparities research by broadening the scope of phase 2 studies and offering rigorous methods to test disparity-reducing implementation strategies in phase 3 studies. We briefly review the focus of phase 2 and phase 3 disparities research. We then provide a decision tree and case examples to illustrate how implementation science frameworks and research designs could further enhance disparity research. Most health disparities research emphasizes patient and provider factors as predominant mechanisms underlying disparities. Applying implementation science frameworks like the Consolidated Framework for Implementation Research could help disparities research widen its scope in phase 2 studies and, in turn, develop broader disparities-reducing implementation strategies in phase 3 studies. Many phase 3 studies of disparity-reducing implementation strategies are similar to case studies, whose designs are not able to fully test causality. Implementation science research designs offer rigorous methods that could accelerate the pace at which equity is achieved in real-world practice. Disparities can be considered a "special case" of implementation challenges-when evidence-based clinical interventions are delivered to, and received by, vulnerable populations at lower rates. Bringing together health disparities research and implementation science could advance equity more than either could achieve on their own.

  10. Developing a Common Framework for Evaluating the Implementation of Genomic Medicine Interventions in Clinical Care: The IGNITE Network’s Common Measures Working Group

    PubMed Central

    Orlando, Lori A.; Sperber, Nina R.; Voils, Corrine; Nichols, Marshall; Myers, Rachel A.; Wu, R. Ryanne; Rakhra-Burris, Tejinder; Levy, Kenneth D.; Levy, Mia; Pollin, Toni I.; Guan, Yue; Horowitz, Carol R.; Ramos, Michelle; Kimmel, Stephen E.; McDonough, Caitrin W.; Madden, Ebony B.; Damschroder, Laura J.

    2017-01-01

    Purpose Implementation research provides a structure for evaluating the clinical integration of genomic medicine interventions. This paper describes the Implementing GeNomics In PracTicE (IGNITE) Network’s efforts to promote: 1) a broader understanding of genomic medicine implementation research; and 2) the sharing of knowledge generated in the network. Methods To facilitate this goal the IGNITE Network Common Measures Working Group (CMG) members adopted the Consolidated Framework for Implementation Research (CFIR) to guide their approach to: identifying constructs and measures relevant to evaluating genomic medicine as a whole, standardizing data collection across projects, and combining data in a centralized resource for cross network analyses. Results CMG identified ten high-priority CFIR constructs as important for genomic medicine. Of those, eight didn’t have standardized measurement instruments. Therefore, we developed four survey tools to address this gap. In addition, we identified seven high-priority constructs related to patients, families, and communities that did not map to CFIR constructs. Both sets of constructs were combined to create a draft genomic medicine implementation model. Conclusion We developed processes to identify constructs deemed valuable for genomic medicine implementation and codified them in a model. These resources are freely available to facilitate knowledge generation and sharing across the field. PMID:28914267

  11. Developing a common framework for evaluating the implementation of genomic medicine interventions in clinical care: the IGNITE Network's Common Measures Working Group.

    PubMed

    Orlando, Lori A; Sperber, Nina R; Voils, Corrine; Nichols, Marshall; Myers, Rachel A; Wu, R Ryanne; Rakhra-Burris, Tejinder; Levy, Kenneth D; Levy, Mia; Pollin, Toni I; Guan, Yue; Horowitz, Carol R; Ramos, Michelle; Kimmel, Stephen E; McDonough, Caitrin W; Madden, Ebony B; Damschroder, Laura J

    2018-06-01

    PurposeImplementation research provides a structure for evaluating the clinical integration of genomic medicine interventions. This paper describes the Implementing Genomics in Practice (IGNITE) Network's efforts to promote (i) a broader understanding of genomic medicine implementation research and (ii) the sharing of knowledge generated in the network.MethodsTo facilitate this goal, the IGNITE Network Common Measures Working Group (CMG) members adopted the Consolidated Framework for Implementation Research (CFIR) to guide its approach to identifying constructs and measures relevant to evaluating genomic medicine as a whole, standardizing data collection across projects, and combining data in a centralized resource for cross-network analyses.ResultsCMG identified 10 high-priority CFIR constructs as important for genomic medicine. Of those, eight did not have standardized measurement instruments. Therefore, we developed four survey tools to address this gap. In addition, we identified seven high-priority constructs related to patients, families, and communities that did not map to CFIR constructs. Both sets of constructs were combined to create a draft genomic medicine implementation model.ConclusionWe developed processes to identify constructs deemed valuable for genomic medicine implementation and codified them in a model. These resources are freely available to facilitate knowledge generation and sharing across the field.

  12. Application of the Double-Tangent Construction of Coexisting Phases to Any Type of Phase Equilibrium for Binary Systems Modeled with the Gamma-Phi Approach

    ERIC Educational Resources Information Center

    Jaubert, Jean-Noël; Privat, Romain

    2014-01-01

    The double-tangent construction of coexisting phases is an elegant approach to visualize all the multiphase binary systems that satisfy the equality of chemical potentials and to select the stable state. In this paper, we show how to perform the double-tangent construction of coexisting phases for binary systems modeled with the gamma-phi…

  13. The next phase in professional services research: From implementation to sustainability.

    PubMed

    Crespo-Gonzalez, Carmen; Garcia-Cardenas, Victoria; Benrimoj, Shalom I

    The provision of professional pharmacy services has been heralded as the professional and the economic future of pharmacy. There are different phases involved in a service creation including service design, impact evaluation, implementation and sustainability. The two first phases have been subject to extensive research. In the last years the principles of Implementation science have been applied in pharmacy to study the initial uptake and integration of evidence-based services into routine practice. However, little attention has been paid to the sustainability of those services, during which there is a continued use of the service previously implemented to achieve and sustain long-term outcomes. The objective of this commentary is to describe the differences and common characteristics between the implementation and the sustainability phase and to propose a definition for pharmacy. A literature search was performed. Four critical elements were identified: 1. The aim of the implementation phase is to incorporate new services into practice, the sustainability phase's aim is to make the services routine to achieve and sustain long-term benefits 2. At the implementation phase planned activities are used as a process to integrate the new service, at the sustainability phase there is a continuous improvement of the service 3. The implementation phase occurs during the period of time between the adoption of a service and its integration. Some authors suggest the sustainability phase is a concomitant phase with the implementation phase and others suggest it is independent 4. There is a lack of consensus regarding the duration of each phase. The following definition of sustainability for pharmacy services is proposed: "Sustainability is a phase in the process of a professional pharmacy service, in which the service previously integrated into practice during the implementation phase is routinized and institutionalized over time to achieve and sustain the expected service outcomes". An agreement on a definition will facilitate an understanding of when the profession has reached this ultimate goal. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Harnessing Implementation Science to Increase the Impact of Health Disparity Research

    PubMed Central

    Chinman, Matthew; Woodward, Eva N.; Curran, Geoffrey M.; Hausmann, Leslie R. M.

    2017-01-01

    Background Health disparities are differences in health or health care between groups based on social, economic, and/or environmental disadvantage. Disparity research often follows three steps: detecting (Phase 1), understanding (Phase 2), and reducing (Phase 3), disparities. While disparities have narrowed over time, many remain. Objectives We argue that implementation science could enhance disparities research by broadening the scope of Phase 2 studies and offering rigorous methods to test disparity-reducing implementation strategies in Phase 3 studies. Methods We briefly review the focus of Phase 2 and Phase 3 disparities research. We then provide a decision tree and case examples to illustrate how implementation science frameworks and research designs could further enhance disparity research. Results Most health disparities research emphasizes patient and provider factors as predominant mechanisms underlying disparities. Applying implementation science frameworks like the Consolidated Framework for Implementation Research could help disparities research widen its scope in Phase 2 studies and, in turn, develop broader disparities-reducing implementation strategies in Phase 3 studies. Many Phase 3 studies of disparity reducing implementation strategies are similar to case studies, whose designs are not able to fully test causality. Implementation science research designs offer rigorous methods that could accelerate the pace at which equity is achieved in real world practice. Conclusions Disparities can be considered a “special case” of implementation challenges—when evidence-based clinical interventions are delivered to, and received by, vulnerable populations at lower rates. Bringing together health disparities research and implementation science could advance equity more than either could achieve on their own. PMID:28806362

  15. Theorizing and researching levels of processing in self-regulated learning.

    PubMed

    Winne, Philip H

    2018-03-01

    Deep versus surface knowledge is widely discussed by educational practitioners. A corresponding construct, levels of processing, has received extensive theoretical and empirical attention in learning science and psychology. In both arenas, lower levels of information and shallower levels of processing are predicted and generally empirically demonstrated to limit knowledge learners gain, curtail what they can do with newly acquired knowledge, and shorten the life span of recently acquired knowledge. I recapitulate major accounts of levels or depth of information and information processing to set a stage for conceptualizing, first, self-regulated learning (SRL) from this perspective and, second, how a "levels-sensitive" approach might be implemented in research about SRL. I merge the levels construct into a model of SRL (Winne, 2011, Handbook of self-regulation of learning and performance (pp. 15-32), New York: Routledge; Winne, 2017b, Handbook of self-regulation of learning and performance (2 nd ed.), New York: Routledge; Winne & Hadwin, 1998, Metacognition in educational theory and practice (pp. 277-304). Mahwah, NJ: Lawrence Erlbaum) conceptually and with respect to operationally defining the levels construct in the context of SRL in relation to each of the model's four phases - surveying task conditions, setting goals and planning, engaging the task, and composing major adaptations for future tasks. Select illustrations are provided for each phase of SRL. Regarding phase 3, a software system called nStudy is introduced as state-of-the-art instrumentation for gathering fine-grained, time-stamped trace data about information learners select for processing and operations they use to process that information. Self-regulated learning can be viewed through a lens of the levels construct, and operational definitions can be designed to research SRL with respect to levels. While information can be organized arbitrarily deeply, the levels construct may not be particularly useful for distinguishing among processes except in a sense that, because processes in SRL operate on information with depth, they epiphenomenally acquire characteristics of levels. Thus, SRL per se is not a deeper kind of processing. Instead, it is processing more complex - deeper - information about a different topic, namely processes for learning. © 2017 The British Psychological Society.

  16. HOOPER BAY HOUSING ANALYSIS AND ENERGY FEASIBILITY REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SEA LION CORPORATION; COLD CLIMATE HOUSING RESEARCH CENTER; SOLUTIONS FOR HEALTHY BREATHING

    2012-12-30

    Sea Lion applied for and received a grant from the Department of Energy (DOE) towards this end titled Energy Efficiency Development and Deployment in Indian Country. The initial objectives of the Hooper Bay Energy Efficiency Feasibility Study were to demonstrate a 30% reduction in residential/commercial energy usage and identify the economic benefits of implementing energy efficiency measures to the Tribe through: (1) partnering with Whitney Construction and Solutions for Healthy Breathing in the training and hire of 2 local energy assessors to conduct energy audits of 9 representative housing models and 2 commercial units in the community. These homes aremore » representative of 52 homes constructed across different eras. (2) partnering with Cold Climate Housing Research Center to document current electrical and heating energy consumption and analyze data for a final feasibility report (3) assessing the economics of electricity & heating fuel usage; (4) projecting energy savings or fossil fuel reduction by modeling of improvement scenarios and cost feasibility The following two objectives will be completed after the publication of this report: (5) the development of materials lists for energy efficiency improvements (6) identifying financing options for the follow-up energy efficiency implementation phase.« less

  17. Reducing CSOs and giving the river back to the public: innovative combined sewer overflow control and riverbanks restoration of the St. Charles River in Quebec City.

    PubMed

    Fradet, Olivier; Pleau, Martin; Marcoux, Christiane

    2011-01-01

    After the construction of its wastewater treatment plants, the City of Quebec began to implement overflow control in wet weather to ultimately meet the effluent discharge objectives, i.e. no more than two overflows per summer season in the St. Lawrence River and no more than four in the St-Charles River. After several years of studies to determine which management strategies would best suit the purpose, and to propose optimum solutions, a first project to implement optimal and predictive management in real time, called "Pilot", came to life in 1999. Construction in phases soon followed and the work was completed in the fall of 2009. As a result, requirements with regard to environmental rejects were met in two sectors, namely the St-Charles River and the Jacques-Cartier Beach, and aquatic recreational activities could resume. Meanwhile, the City also worked at giving back access to the water courses to the public by developing sites at the Jacques-Cartier Beach and in the Bay of Beauport, and by rehabilitating the banks of the St-Charles River.

  18. Analysis of administrative barriers in the industry of the high-rise construction in Russian Federation

    NASA Astrophysics Data System (ADS)

    Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana

    2018-03-01

    The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.

  19. Biomass power for rural development. Technical progress report, July 1--September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less

  20. Implementation Guidance for Accelerated Bridge Construction in South Dakota : Research Brief

    DOT National Transportation Integrated Search

    2017-09-01

    Investigate typical accelerated bridge construction methods and their applicability in South Dakota. A study was conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. The main objective of this study wa...

  1. (Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  2. Universal photonic quantum gates assisted by ancilla diamond nitrogen-vacancy centers coupled to resonators

    NASA Astrophysics Data System (ADS)

    Wei, Hai-Rui; Long, Gui Lu

    2015-03-01

    We propose two compact, economic, and scalable schemes for implementing optical controlled-phase-flip and controlled-controlled-phase-flip gates by using the input-output process of a single-sided cavity strongly coupled to a single nitrogen-vacancy-center defect in diamond. Additional photonic qubits, necessary for procedures based on the parity-check measurement or controlled-path and merging gates, are not employed in our schemes. In the controlled-path gate, the paths of the target photon are conditionally controlled by the control photon, and these two paths can be merged back into one by using a merging gate. Only one half-wave plate is employed in our scheme for the controlled-phase-flip gate. Compared with the conventional synthesis procedures for constructing a controlled-controlled-phase-flip gate, the cost of which is two controlled-path gates and two merging gates, or six controlled-not gates, our scheme is more compact and simpler. Our schemes could be performed with a high fidelity and high efficiency with current achievable experimental techniques.

  3. Automated phase mapping with AgileFD and its application to light absorber discovery in the V–Mn–Nb oxide system

    DOE PAGES

    Suram, Santosh K.; Xue, Yexiang; Bai, Junwen; ...

    2016-11-21

    Rapid construction of phase diagrams is a central tenet of combinatorial materials science with accelerated materials discovery efforts often hampered by challenges in interpreting combinatorial X-ray diffraction data sets, which we address by developing AgileFD, an artificial intelligence algorithm that enables rapid phase mapping from a combinatorial library of X-ray diffraction patterns. AgileFD models alloying-based peak shifting through a novel expansion of convolutional nonnegative matrix factorization, which not only improves the identification of constituent phases but also maps their concentration and lattice parameter as a function of composition. By incorporating Gibbs’ phase rule into the algorithm, physically meaningful phase mapsmore » are obtained with unsupervised operation, and more refined solutions are attained by injecting expert knowledge of the system. The algorithm is demonstrated through investigation of the V–Mn–Nb oxide system where decomposition of eight oxide phases, including two with substantial alloying, provides the first phase map for this pseudoternary system. This phase map enables interpretation of high-throughput band gap data, leading to the discovery of new solar light absorbers and the alloying-based tuning of the direct-allowed band gap energy of MnV 2O 6. Lastly, the open-source family of AgileFD algorithms can be implemented into a broad range of high throughput workflows to accelerate materials discovery.« less

  4. Automated phase mapping with AgileFD and its application to light absorber discovery in the V–Mn–Nb oxide system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suram, Santosh K.; Xue, Yexiang; Bai, Junwen

    Rapid construction of phase diagrams is a central tenet of combinatorial materials science with accelerated materials discovery efforts often hampered by challenges in interpreting combinatorial X-ray diffraction data sets, which we address by developing AgileFD, an artificial intelligence algorithm that enables rapid phase mapping from a combinatorial library of X-ray diffraction patterns. AgileFD models alloying-based peak shifting through a novel expansion of convolutional nonnegative matrix factorization, which not only improves the identification of constituent phases but also maps their concentration and lattice parameter as a function of composition. By incorporating Gibbs’ phase rule into the algorithm, physically meaningful phase mapsmore » are obtained with unsupervised operation, and more refined solutions are attained by injecting expert knowledge of the system. The algorithm is demonstrated through investigation of the V–Mn–Nb oxide system where decomposition of eight oxide phases, including two with substantial alloying, provides the first phase map for this pseudoternary system. This phase map enables interpretation of high-throughput band gap data, leading to the discovery of new solar light absorbers and the alloying-based tuning of the direct-allowed band gap energy of MnV 2O 6. Lastly, the open-source family of AgileFD algorithms can be implemented into a broad range of high throughput workflows to accelerate materials discovery.« less

  5. Mapping of information and identification of construction waste at project life cycle

    NASA Astrophysics Data System (ADS)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  6. S-band SBAW microwave source, phase 2

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Results of aging experiments on 1.072 GHz SBAW oscillators are discussed as well as the design, fabrication and test of 2.143 GHz SBAW delay lines. Two design approaches were implemented. The third harmonic transducer on 36 deg rotated Y cut quartz proved to be the most useful design, whereas the fifth harmonic transducer on - 50 5 deg rotated Y cut quartz suffered from high insertion loss and poor sidelobe rejection. The construction and characterization of the 2 GHz SBAW oscillator are described. Phase noise, frequency dependence on temperature, and 6-month aging were measured. Some SAW and SBAW oscillators were compared as were both the 1 and 2 GHz oscillators. The 2 GHz SBAW oscillator showed significant improvement in phase noise and temperature stability over the 2 GHz SAW oscillator developed in previous NASA programs. A technique to produce SBAW delay lines of different frequencies from a single mask is examined. The delay lines were incorporated into oscillator circuits to demonstrate the ability to select the frequency output of the SBAW oscillator.

  7. The Keck Cosmic Web Imager (KCWI): A Powerful New Integral Field Spectrograph for the Keck Observatory

    NASA Astrophysics Data System (ADS)

    Morrissey, Patrick; KCWI Team

    2013-01-01

    The Keck Cosmic Web Imager (KCWI) is a new facility instrument being developed for the W. M. Keck Observatory and funded for construction by the Telescope System Instrumentation Program (TSIP) of the National Science Foundation (NSF). KCWI is a bench-mounted spectrograph for the Keck II right Nasmyth focal station, providing integral field spectroscopy over a seeing-limited field up to 20"x33" in extent. Selectable Volume Phase Holographic (VPH) gratings provide high efficiency and spectral resolution in the range of 1000 to 20000. The dual-beam design of KCWI passed a Preliminary Design Review in summer 2011. The detailed design of the KCWI blue channel (350 to 700 nm) is now nearly complete, with the red channel (530 to 1050 nm) planned for a phased implementation contingent upon additional funding. KCWI builds on the experience of the Caltech team in implementing the Cosmic Web Imager (CWI), in operation since 2009 at Palomar Observatory. KCWI adds considerable flexibility to the CWI design, and will take full advantage of the excellent seeing and dark sky above Mauna Kea with a selectable nod-and-shuffle observing mode. The KCWI team is lead by Caltech (project management, design and implementation) in partnership with the University of California at Santa Cruz (camera optical and mechanical design) and the W. M. Keck Observatory (program oversight and observatory interfaces).

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurst, Aaron M.

    A data structure based on an eXtensible Markup Language (XML) hierarchy according to experimental nuclear structure data in the Evaluated Nuclear Structure Data File (ENSDF) is presented. A Python-coded translator has been developed to interpret the standard one-card records of the ENSDF datasets, together with their associated quantities defined according to field position, and generate corresponding representative XML output. The quantities belonging to this mixed-record format are described in the ENSDF manual. Of the 16 ENSDF records in total, XML output has been successfully generated for 15 records. An XML-translation for the Comment Record is yet to be implemented; thismore » will be considered in a separate phase of the overall translation effort. Continuation records, not yet implemented, will also be treated in a future phase of this work. Several examples are presented in this document to illustrate the XML schema and methods for handling the various ENSDF data types. However, the proposed nomenclature for the XML elements and attributes need not necessarily be considered as a fixed set of constructs. Indeed, better conventions may be suggested and a consensus can be achieved amongst the various groups of people interested in this project. The main purpose here is to present an initial phase of the translation effort to demonstrate the feasibility of interpreting ENSDF datasets and creating a representative XML-structured hierarchy for data storage.« less

  9. A monolithic homotopy continuation algorithm with application to computational fluid dynamics

    NASA Astrophysics Data System (ADS)

    Brown, David A.; Zingg, David W.

    2016-09-01

    A new class of homotopy continuation methods is developed suitable for globalizing quasi-Newton methods for large sparse nonlinear systems of equations. The new continuation methods, described as monolithic homotopy continuation, differ from the classical predictor-corrector algorithm in that the predictor and corrector phases are replaced with a single phase which includes both a predictor and corrector component. Conditional convergence and stability are proved analytically. Using a Laplacian-like operator to construct the homotopy, the new algorithm is shown to be more efficient than the predictor-corrector homotopy continuation algorithm as well as an implementation of the widely-used pseudo-transient continuation algorithm for some inviscid and turbulent, subsonic and transonic external aerodynamic flows over the ONERA M6 wing and the NACA 0012 airfoil using a parallel implicit Newton-Krylov finite-difference flow solver.

  10. Silicon material task - Low cost solar array project /JPL/DOE/

    NASA Technical Reports Server (NTRS)

    Lutwack, R.

    1979-01-01

    The paper describes the silicon material task of the low-cost solar array project, which has the objective of establishing a silicon production capability equivalent to 500 mW per year at a price less than 10 dollars/kg (1975 dollars) in 1986. The task program is divided into four phases: technical feasibility, scale-up studies (the present phase), experimental process system development units, and implementation of large-scale production plants, and it involves the development of processes for two groups of materials, that is, semiconductor grade and solar cell grade. In addition, the effects of impurities on solar cell performance are being investigated. Attention is given to problem areas of the task program, such as environmental protection, material compatibility between the reacting chemicals and materials of construction of the equipment, and waste disposal.

  11. Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency

    NASA Astrophysics Data System (ADS)

    Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.

    2017-11-01

    In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

  12. The Greenhouse Gas Emission from Portland Cement Concrete Pavement Construction in China.

    PubMed

    Ma, Feng; Sha, Aimin; Yang, Panpan; Huang, Yue

    2016-06-24

    This study proposes an inventory analysis method to evaluate the greenhouse gas (GHG) emissions from Portland cement concrete pavement construction, based on a case project in the west of China. The concrete pavement construction process was divided into three phases, namely raw material production, concrete manufacture and pavement onsite construction. The GHG emissions of the three phases are analyzed by a life cycle inventory method. The CO₂e is used to indicate the GHG emissions. The results show that for 1 km Portland cement concrete pavement construction, the total CO₂e is 8215.31 tons. Based on the evaluation results, the CO₂e of the raw material production phase is 7617.27 tons, accounting for 92.7% of the total GHG emissions; the CO₂e of the concrete manufacture phase is 598,033.10 kg, accounting for 7.2% of the total GHG emissions. Lastly, the CO₂e of the pavement onsite construction phase is 8396.59 kg, accounting for only 0.1% of the total GHG emissions. The main greenhouse gas is CO₂ in each phase, which accounts for more than 98% of total emissions. N₂O and CH₄ emissions are relatively insignificant.

  13. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk; Poon, C.S.; Wong, Agnes

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS)more » to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.« less

  14. A novel heterogeneous algorithm to simulate multiphase flow in porous media on multicore CPU-GPU systems

    NASA Astrophysics Data System (ADS)

    McClure, J. E.; Prins, J. F.; Miller, C. T.

    2014-07-01

    Multiphase flow implementations of the lattice Boltzmann method (LBM) are widely applied to the study of porous medium systems. In this work, we construct a new variant of the popular "color" LBM for two-phase flow in which a three-dimensional, 19-velocity (D3Q19) lattice is used to compute the momentum transport solution while a three-dimensional, seven velocity (D3Q7) lattice is used to compute the mass transport solution. Based on this formulation, we implement a novel heterogeneous GPU-accelerated algorithm in which the mass transport solution is computed by multiple shared memory CPU cores programmed using OpenMP while a concurrent solution of the momentum transport is performed using a GPU. The heterogeneous solution is demonstrated to provide speedup of 2.6 × as compared to multi-core CPU solution and 1.8 × compared to GPU solution due to concurrent utilization of both CPU and GPU bandwidths. Furthermore, we verify that the proposed formulation provides an accurate physical representation of multiphase flow processes and demonstrate that the approach can be applied to perform heterogeneous simulations of two-phase flow in porous media using a typical GPU-accelerated workstation.

  15. Development of porous lamellar poly(L-lactic acid) scaffolds by conventional injection molding process.

    PubMed

    Ghosh, Satyabrata; Viana, Júlio C; Reis, Rui L; Mano, João F

    2008-07-01

    A novel fabrication technique is proposed for the preparation of unidirectionally oriented, porous scaffolds by selective polymer leaching from lamellar structures created by conventional injection molding. The proof of the concept is implemented using a 50/50 wt.% poly(L-lactic acid)/poly(ethylene oxide) (PLLA/PEO) blend. With this composition, the PLLA and PEO blend is biphasic, containing a homogeneous PLLA/PEO phase and a PEO-rich phase. The two phases were structured using injection molding into well-defined alternating layers of homogeneous PLLA/PEO phase and PEO-rich phase. Leaching of water-soluble PEO from the PEO-rich phase produces macropores, and leaching of phase-separated PEO from the initially homogeneous PLLA/PEO phase produces micropores in the lamellae. Thus, scaffolds with a macroporous lamellar architecture with microporous walls can be produced. The lamellae are continuous along the flow direction, and a continuous lamellar thickness of less than 1 microm could be achieved. Porosities of 57-74% and pore sizes of around 50-100 microm can be obtained using this process. The tensile elastic moduli of the porous constructs were between 580 and 800 MPa. We propose that this organic-solvent-free method of preparing lamellar scaffolds with good mechanical properties, and the reproducibility associated with the injection molding technique, holds promise for a wide range of guided tissue engineering applications.

  16. Phase in Optical Image Processing

    NASA Astrophysics Data System (ADS)

    Naughton, Thomas J.

    2010-04-01

    The use of phase has a long standing history in optical image processing, with early milestones being in the field of pattern recognition, such as VanderLugt's practical construction technique for matched filters, and (implicitly) Goodman's joint Fourier transform correlator. In recent years, the flexibility afforded by phase-only spatial light modulators and digital holography, for example, has enabled many processing techniques based on the explicit encoding and decoding of phase. One application area concerns efficient numerical computations. Pushing phase measurement to its physical limits, designs employing the physical properties of phase have ranged from the sensible to the wonderful, in some cases making computationally easy problems easier to solve and in other cases addressing mathematics' most challenging computationally hard problems. Another application area is optical image encryption, in which, typically, a phase mask modulates the fractional Fourier transformed coefficients of a perturbed input image, and the phase of the inverse transform is then sensed as the encrypted image. The inherent linearity that makes the system so elegant mitigates against its use as an effective encryption technique, but we show how a combination of optical and digital techniques can restore confidence in that security. We conclude with the concept of digital hologram image processing, and applications of same that are uniquely suited to optical implementation, where the processing, recognition, or encryption step operates on full field information, such as that emanating from a coherently illuminated real-world three-dimensional object.

  17. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    NASA Astrophysics Data System (ADS)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  18. 75 FR 51988 - Bison Pipeline LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... (Certificate) in order to construct the Project in two phases; first to meet the service requirements of the... rates for transportation service approved in the Order. During the first phase, Bison would construct... and related appurtenances as authorized in the Order (Phase 1). During the second phase, Bison plans...

  19. Design of the stabilizing control of the orbital motion in the vicinity of the collinear libration point L1 using the analytical representation of the invariant manifold

    NASA Astrophysics Data System (ADS)

    Maliavkin, G. P.; Shmyrov, A. S.; Shmyrov, V. A.

    2018-05-01

    Vicinities of collinear libration points of the Sun-Earth system are currently quite attractive for the space navigation. Today, various projects on placing of spacecrafts observing the Sun in the L1 libration point and telescopes in L2 have been implemented (e.g. spacecrafts "WIND", "SOHO", "Herschel", "Planck"). Collinear libration points being unstable leads to the problem of stabilization of a spacecraft's motion. Laws of stabilizing motion control in vicinity of L1 point can be constructed using the analytical representation of a stable invariant manifold. Efficiency of these control laws depends on the precision of the representation. Within the model of Hill's approximation of the circular restricted three-body problem in the rotating geocentric coordinate system one can obtain the analytical representation of an invariant manifold filled with bounded trajectories in a form of series in terms of powers of the phase variables. Approximate representations of the orders from the first to the fourth inclusive can be used to construct four laws of stabilizing feedback motion control under which trajectories approach the manifold. By virtue of numerical simulation the comparison can be made: how the precision of the representation of the invariant manifold influences the efficiency of the control, expressed by energy consumptions (characteristic velocity). It shows that using approximations of higher orders in constructing the control laws can significantly reduce the energy consumptions on implementing the control compared to the linear approximation.

  20. Integrating Cost-effective Rollover Protective Structure Installation in High School Agricultural Mechanics: A Feasibility Study.

    PubMed

    Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan

    2015-01-01

    This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.

  1. Laboratory demonstration of an optical vortex mask coronagraph using photonic crystal

    NASA Astrophysics Data System (ADS)

    Murakami, N.; Baba, N.; Ise, A.; Sakamoto, M.; Oka, K.

    2010-10-01

    Photonic crystal, artificial periodic nanostructure, is an attractive device for constructing focal-plane phase-mask coronagraphs such as segmented phase masks (four-quadrant, eight-octant, and 4N-segmented ones) and an optical vortex mask (OVM), because of its extremely small manufacturing defect. Recently, speckle-noise limited contrast has been demonstrated for two monochromatic lasers by using the eight-octant phase-mask made of the photonic crystal (Murakami et al. 2010, ApJ, 714, 772). We applied the photonic-crystal device to the OVM coronagraph. The OVM is more advantageous over the segmented phase masks because it does not have discontinuities other than a central singular point and provides a full on-sky field of view. For generating an achromatic optical vortex, we manufactured an axially-symmetric half-wave plate (ASHWP). It is expected that a size of the manufacturing defect due to the central singularity is an order of several hundreds nanometers. The ASHWP is placed between two circular polarizers for modulating a Pancharatnam phase. A continuous spiral phase modulation is then implemented achromatically. We carried out preliminary laboratory demonstration of the OVM coronagraph using two monochromatic lasers as a model star (wavelengths of 532 nm and 633 nm). We report a principle of the achromatic optical-vortex generation, and results of the laboratory demonstration of the OVM coronagraph.

  2. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  3. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    PubMed

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  4. Evaluation of a large-scale weight management program using the consolidated framework for implementation research (CFIR)

    PubMed Central

    2013-01-01

    Background In the United States, as in many other parts of the world, the prevalence of overweight/obesity is at epidemic proportions in the adult population and even higher among Veterans. To address the high prevalence of overweight/obesity among Veterans, the MOVE!® weight management program was disseminated nationally to Veteran Affairs (VA) medical centers. The objective of this paper is two-fold: to describe factors that explain the wide variation in implementation of MOVE!; and to illustrate, step-by-step, how to apply a theory-based framework using qualitative data. Methods Five VA facilities were selected to maximize variation in implementation effectiveness and geographic location. Twenty-four key stakeholders were interviewed about their experiences in implementing MOVE!. The Consolidated Framework for Implementation Research (CFIR) was used to guide collection and analysis of qualitative data. Constructs that most strongly influence implementation effectiveness were identified through a cross-case comparison of ratings. Results Of the 31 CFIR constructs assessed, ten constructs strongly distinguished between facilities with low versus high program implementation effectiveness. The majority (six) were related to the inner setting: networks and communications; tension for change; relative priority; goals and feedback; learning climate; and leadership engagement. One construct each, from intervention characteristics (relative advantage) and outer setting (patient needs and resources), plus two from process (executing and reflecting) also strongly distinguished between high and low implementation. Two additional constructs weakly distinguished, 16 were mixed, three constructs had insufficient data to assess, and one was not applicable. Detailed descriptions of how each distinguishing construct manifested in study facilities and a table of recommendations is provided. Conclusions This paper presents an approach for using the CFIR to code and rate qualitative data in a way that will facilitate comparisons across studies. An online Wiki resource (http://www.wiki.cfirwiki.net) is available, in addition to the information presented here, that contains much of the published information about the CFIR and its constructs and sub-constructs. We hope that the described approach and open access to the CFIR will generate wide use and encourage dialogue and continued refinement of both the framework and approaches for applying it. PMID:23663819

  5. Evaluation of a large-scale weight management program using the consolidated framework for implementation research (CFIR).

    PubMed

    Damschroder, Laura J; Lowery, Julie C

    2013-05-10

    In the United States, as in many other parts of the world, the prevalence of overweight/obesity is at epidemic proportions in the adult population and even higher among Veterans. To address the high prevalence of overweight/obesity among Veterans, the MOVE!(®) weight management program was disseminated nationally to Veteran Affairs (VA) medical centers. The objective of this paper is two-fold: to describe factors that explain the wide variation in implementation of MOVE!; and to illustrate, step-by-step, how to apply a theory-based framework using qualitative data. Five VA facilities were selected to maximize variation in implementation effectiveness and geographic location. Twenty-four key stakeholders were interviewed about their experiences in implementing MOVE!. The Consolidated Framework for Implementation Research (CFIR) was used to guide collection and analysis of qualitative data. Constructs that most strongly influence implementation effectiveness were identified through a cross-case comparison of ratings. Of the 31 CFIR constructs assessed, ten constructs strongly distinguished between facilities with low versus high program implementation effectiveness. The majority (six) were related to the inner setting: networks and communications; tension for change; relative priority; goals and feedback; learning climate; and leadership engagement. One construct each, from intervention characteristics (relative advantage) and outer setting (patient needs and resources), plus two from process (executing and reflecting) also strongly distinguished between high and low implementation. Two additional constructs weakly distinguished, 16 were mixed, three constructs had insufficient data to assess, and one was not applicable. Detailed descriptions of how each distinguishing construct manifested in study facilities and a table of recommendations is provided. This paper presents an approach for using the CFIR to code and rate qualitative data in a way that will facilitate comparisons across studies. An online Wiki resource (http://www.wiki.cfirwiki.net) is available, in addition to the information presented here, that contains much of the published information about the CFIR and its constructs and sub-constructs. We hope that the described approach and open access to the CFIR will generate wide use and encourage dialogue and continued refinement of both the framework and approaches for applying it.

  6. Programming models for energy-aware systems

    NASA Astrophysics Data System (ADS)

    Zhu, Haitao

    Energy efficiency is an important goal of modern computing, with direct impact on system operational cost, reliability, usability and environmental sustainability. This dissertation describes the design and implementation of two innovative programming languages for constructing energy-aware systems. First, it introduces ET, a strongly typed programming language to promote and facilitate energy-aware programming, with a novel type system design called Energy Types. Energy Types is built upon a key insight into today's energy-efficient systems and applications: despite the popular perception that energy and power can only be described in joules and watts, real-world energy management is often based on discrete phases and modes, which in turn can be reasoned about by type systems very effectively. A phase characterizes a distinct pattern of program workload, and a mode represents an energy state the program is expected to execute in. Energy Types is designed to reason about energy phases and energy modes, bringing programmers into the optimization of energy management. Second, the dissertation develops Eco, an energy-aware programming language centering around sustainability. A sustainable program built from Eco is able to adaptively adjusts its own behaviors to stay on a given energy budget, avoiding both deficit that would lead to battery drain or CPU overheating, and surplus that could have been used to improve the quality of the program output. Sustainability is viewed as a form of supply and demand matching, and a sustainable program consistently maintains the equilibrium between supply and demand. ET is implemented as a prototyped compiler for smartphone programming on Android, and Eco is implemented as a minimal extension to Java. Programming practices and benchmarking experiments in these two new languages showed that ET can lead to significant energy savings for Android Apps and Eco can efficiently promote battery awareness and temperature awareness in real-world Java programs.

  7. 18 CFR 4.96 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  8. Initial constructs for patient-centered outcome measures to evaluate brain-computer interfaces.

    PubMed

    Andresen, Elena M; Fried-Oken, Melanie; Peters, Betts; Patrick, Donald L

    2016-10-01

    The authors describe preliminary work toward the creation of patient-centered outcome (PCO) measures to evaluate brain-computer interface (BCI) as an assistive technology (AT) for individuals with severe speech and physical impairments (SSPI). In Phase 1, 591 items from 15 existing measures were mapped to the International Classification of Functioning, Disability and Health (ICF). In Phase 2, qualitative interviews were conducted with eight people with SSPI and seven caregivers. Resulting text data were coded in an iterative analysis. Most items (79%) were mapped to the ICF environmental domain; over half (53%) were mapped to more than one domain. The ICF framework was well suited for mapping items related to body functions and structures, but less so for items in other areas, including personal factors. Two constructs emerged from qualitative data: quality of life (QOL) and AT. Component domains and themes were identified for each. Preliminary constructs, domains and themes were generated for future PCO measures relevant to BCI. Existing instruments are sufficient for initial items but do not adequately match the values of people with SSPI and their caregivers. Field methods for interviewing people with SSPI were successful, and support the inclusion of these individuals in PCO research. Implications for Rehabilitation Adapted interview methods allow people with severe speech and physical impairments to participate in patient-centered outcomes research. Patient-centered outcome measures are needed to evaluate the clinical implementation of brain-computer interface as an assistive technology.

  9. A review of BIM (Building Information Modeling) implementation in Indonesia construction industry

    NASA Astrophysics Data System (ADS)

    Suryadinata Telaga, Abdi

    2018-05-01

    Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.

  10. Infrastructure design integration to optimize structures and minimize groundwater impacts. Case of a bottom slab and groundwater by-pass integration in La Sagrera railway station, Spain.

    NASA Astrophysics Data System (ADS)

    Serrano Juan, Alejandro; Vázquez-Suñè, Enric; Pujades, Estanislao; Velasco, Violeta; Criollo, Rotman; Jurado, Anna

    2016-04-01

    Underground constructions search the most efficient solutions to increase safety, reduce impacts in both underground construction (such as bottom slab water pressures) and groundwater (such as groundwater barrier effect), reduce future maintenance processes and ensure that everything is implemented by the minimum cost. Even being all the previous solutions directly related to groundwater, independent solutions are usually designed to independently deal with each problem. This paper shows how with a groundwater by-pass design that enables the groundwater flow through the structure it is possible to provide an homogeneous distribution of the water pressures under the bottom slab and reduce the barrier effect produced by the structure. The new integrated design has been applied to the largest infrastructure of Barcelona: La Sagrera railway station. Through a hydrogeological model has been possible to test the project and the integrated designs in three different scenarios. This new solution resolves the barrier effect produced by the structure and optimizes the bottom slab, reducing considerably the costs and increasing safety during the construction phase.

  11. 18 CFR 4.104 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  12. 40 CFR 80.1403 - Which fuels are not subject to the 20% GHG thresholds?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... multi-phased projects, the commencement of construction of one phase does not constitute commencement of construction of any later phase, unless each phase is mutually dependent for physical and chemical reasons only... baseline lifecycle greenhouse gas emissions. (f) If there are any changes in the mix of renewable fuels...

  13. The Greenhouse Gas Emission from Portland Cement Concrete Pavement Construction in China

    PubMed Central

    Ma, Feng; Sha, Aimin; Yang, Panpan; Huang, Yue

    2016-01-01

    This study proposes an inventory analysis method to evaluate the greenhouse gas (GHG) emissions from Portland cement concrete pavement construction, based on a case project in the west of China. The concrete pavement construction process was divided into three phases, namely raw material production, concrete manufacture and pavement onsite construction. The GHG emissions of the three phases are analyzed by a life cycle inventory method. The CO2e is used to indicate the GHG emissions. The results show that for 1 km Portland cement concrete pavement construction, the total CO2e is 8215.31 tons. Based on the evaluation results, the CO2e of the raw material production phase is 7617.27 tons, accounting for 92.7% of the total GHG emissions; the CO2e of the concrete manufacture phase is 598,033.10 kg, accounting for 7.2% of the total GHG emissions. Lastly, the CO2e of the pavement onsite construction phase is 8396.59 kg, accounting for only 0.1% of the total GHG emissions. The main greenhouse gas is CO2 in each phase, which accounts for more than 98% of total emissions. N2O and CH4 emissions are relatively insignificant. PMID:27347987

  14. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    NASA Astrophysics Data System (ADS)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  15. Factors Influencing Implementation of OHSAS 18001 in Indian Construction Organizations: Interpretive Structural Modeling Approach

    PubMed Central

    Rajaprasad, Sunku Venkata Siva; Chalapathi, Pasupulati Venkata

    2015-01-01

    Background Construction activity has made considerable breakthroughs in the past two decades on the back of increases in development activities, government policies, and public demand. At the same time, occupational health and safety issues have become a major concern to construction organizations. The unsatisfactory safety performance of the construction industry has always been highlighted since the safety management system is neglected area and not implemented systematically in Indian construction organizations. Due to a lack of enforcement of the applicable legislation, most of the construction organizations are forced to opt for the implementation of Occupational Health Safety Assessment Series (OHSAS) 18001 to improve safety performance. Methods In order to better understand factors influencing the implementation of OHSAS 18001, an interpretive structural modeling approach has been applied and the factors have been classified using matrice d'impacts croises-multiplication appliqué a un classement (MICMAC) analysis. The study proposes the underlying theoretical framework to identify factors and to help management of Indian construction organizations to understand the interaction among factors influencing in implementation of OHSAS 18001. Results Safety culture, continual improvement, morale of employees, and safety training have been identified as dependent variables. Safety performance, sustainable construction, and conducive working environment have been identified as linkage variables. Management commitment and safety policy have been identified as the driver variables. Conclusion Management commitment has the maximum driving power and the most influential factor is safety policy, which states clearly the commitment of top management towards occupational safety and health. PMID:26929828

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heijkoop, Sabrina T., E-mail: s.heijkoop@erasmusmc.nl; Langerak, Thomas R.; Quint, Sandra

    Purpose: To evaluate the clinical implementation of an online adaptive plan-of-the-day protocol for nonrigid target motion management in locally advanced cervical cancer intensity modulated radiation therapy (IMRT). Methods and Materials: Each of the 64 patients had four markers implanted in the vaginal fornix to verify the position of the cervix during treatment. Full and empty bladder computed tomography (CT) scans were acquired prior to treatment to build a bladder volume-dependent cervix-uterus motion model for establishment of the plan library. In the first phase of clinical implementation, the library consisted of one IMRT plan based on a single model-predicted internal targetmore » volume (mpITV), covering the target for the whole pretreatment observed bladder volume range, and a 3D conformal radiation therapy (3DCRT) motion-robust backup plan based on the same mpITV. The planning target volume (PTV) combined the ITV and nodal clinical target volume (CTV), expanded with a 1-cm margin. In the second phase, for patients showing >2.5-cm bladder-induced cervix-uterus motion during planning, two IMRT plans were constructed, based on mpITVs for empty-to-half-full and half-full-to-full bladder. In both phases, a daily cone beam CT (CBCT) scan was acquired to first position the patient based on bony anatomy and nodal targets and then select the appropriate plan. Daily post-treatment CBCT was used to verify plan selection. Results: Twenty-four and 40 patients were included in the first and second phase, respectively. In the second phase, 11 patients had two IMRT plans. Overall, an IMRT plan was used in 82.4% of fractions. The main reasons for selecting the motion-robust backup plan were uterus outside the PTV (27.5%) and markers outside their margin (21.3%). In patients with two IMRT plans, the half-full-to-full bladder plan was selected on average in 45% of the first 12 fractions, which was reduced to 35% in the last treatment fractions. Conclusions: The implemented online adaptive plan-of-the-day protocol for locally advanced cervical cancer enables (almost) daily tissue-sparing IMRT.« less

  17. Benefits and Sustainability of a Learning Collaborative for Implementation of Treat to Target in Rheumatoid Arthritis: Results of the TRACTION Trial Phase II.

    PubMed

    Solomon, Daniel H; Lu, Bing; Yu, Zhi; Corrigan, Cassandra; Harrold, Leslie R; Smolen, Josef S; Fraenkel, Liana; Katz, Jeffrey N; Losina, Elena

    2018-01-05

    We conducted a two-phase randomized controlled trial of a Learning Collaborative (LC) to facilitate implementation of treat to target (TTT) to manage rheumatoid arthritis (RA). We found substantial improvement in implementation of TTT in Phase I. Herein, we report on a second 9 months (Phase II) where we examined maintenance of response in Phase I and predictors of greater improvement in TTT adherence. We recruited 11 rheumatology sites and randomized them to either receive the LC during Phase I or to a wait-list control group that received the LC intervention during Phase II. The outcome was change in TTT implementation score (0 to 100, 100 is best) from pre- to post-intervention. TTT implementation score is defined as a percent of components documented in visit notes. Analyses examined: 1) the extent that the Phase I intervention teams sustained improvement in TTT; and, 2) predictors of TTT improvement. The analysis included 636 RA patients. At baseline, mean TTT implementation score was 11% in Phase I intervention sites and 13% in Phase II sites. After the intervention, TTT implementation score improved to 57% in the Phase I intervention sites and to 58% in the Phase II sites. Intervention sites from Phase I sustained the improvement during the Phase II (52%). Predictors of greater TTT improvement included only having rheumatologist providers at the site, academic affiliation of the site, fewer providers per site, and the rheumatologist provider being a trainee. Improvement in TTT remained relatively stable over a post-intervention period. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  18. Estimating long-term behavior of periodically driven flows without trajectory integration

    NASA Astrophysics Data System (ADS)

    Froyland, Gary; Koltai, Péter

    2017-05-01

    Periodically driven flows are fundamental models of chaotic behavior and the study of their transport properties is an active area of research. A well-known analytic construction is the augmentation of phase space with an additional time dimension; in this augmented space, the flow becomes autonomous or time-independent. We prove several results concerning the connections between the original time-periodic representation and the time-extended representation, focusing on transport properties. In the deterministic setting, these include single-period outflows and time-asymptotic escape rates from time-parameterized families of sets. We also consider stochastic differential equations with time-periodic advection term. In this stochastic setting one has a time-periodic generator (the differential operator given by the right-hand-side of the corresponding time-periodic Fokker-Planck equation). We define in a natural way an autonomous generator corresponding to the flow on time-extended phase space. We prove relationships between these two generator representations and use these to quantify decay rates of observables and to determine time-periodic families of sets with slow escape rate. Finally, we use the generator on the time-extended phase space to create efficient numerical schemes to implement the various theoretical constructions. These ideas build on the work of Froyland et al (2013 SIAM J. Numer. Anal. 51 223-47), and no expensive time integration is required. We introduce an efficient new hybrid approach, which treats the space and time dimensions separately.

  19. Towards Implementation of Green Technology in Sabah Construction Industry

    NASA Astrophysics Data System (ADS)

    Azland Jainudin, Noor; Jugah, Ivy; Nasrizal Awang Ali, Awang; Tawie, Rudy

    2017-12-01

    The construction industry in Sabah is one of the major roles for development of social, economic infrastructures and buildings in generating wealth to the state besides the tourism sector. The increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. The objective of the research is to identify the awareness and implementation of green technology in construction industry in Kota Kinabalu, Sabah. The methodology of the research is through distributing the questionnaire to the contractors, developers, consultants, architects and state government agencies to the area in Kota Kinabalu only. The questionnaires had been analysed to find out the mean value. 100 questionnaires distributed to the respondents but merely 85 questionnaires collected have been analysed. Based on the findings, 83.5% organisations were aware with the concept of green technology in construction project. In terms of the implementation only 64.7% had been implemented in their organizations. More than 50% from the major players such as contractors, consultants, developers, architects and state government agencies were aware based on six green technology concepts in their organizations. As a conclusion, the awareness towards green policy concept in construction industry is very satisfied. Meanwhile, in terms of implementation need to be increased the number of organizations to be involved in green technology in construction industry.

  20. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1987-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  1. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1988-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Flight Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  2. [Process of construction of the national research agenda on Human Resources in Health in Peru 2011 - 2014].

    PubMed

    Curisinche, Maricela; Yagui, Martín; Castilla, Teresa; Cabezas, César; Escalante, Giovanni; Casas, María; Lucero, Jorge

    2011-06-01

    The National Health Authority of Peru, as part of the implementation of national priorities for health research in 2010 developed the process of building the national research agenda on health manpower (HM). In a scenario of technical challenges, national and international policy and under a nation-wide participatory approach with key stakeholders in the health system, training and aid HM linked to the subject, establishing a socially agreed agenda. Process consists of 3 phases: 1. National review of evidence and relevant information on RHUS, 2. Consultation with opinion leaders and subject experts, and 3. A collaborative space (national workshop) of deliberation, consensus and legitimacy of the agenda. Finally, we present the agenda consists of 30 research topics on health manpower, to be developed in the period 2011- 2014, and raises the challenges and prospects for implementation.

  3. Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less

  4. AASHTOWare Preconstruction Preliminary Investigation

    DOT National Transportation Integrated Search

    2017-12-17

    The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...

  5. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    NASA Astrophysics Data System (ADS)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  6. New procedures of ergonomics design in a large oil company.

    PubMed

    Alhadeff, Cynthia Mossé; Silva, Rosana Fernandes da; Reis, Márcia Sales dos

    2012-01-01

    This study presents the challenge involved in the negotiation and construction of a standard process in a major petroleum company that has the purpose of guiding the implementation of ergonomic studies in the development of projects, systemising the implementation of ergonomics design. The standard was created by a multi-disciplinary working group consisting of specialists in ergonomics, who work in a number of different areas of the company. The objective was to guide "how to" undertake ergonomics in all projects, taking into consideration the development of the ergonomic appraisals of work. It also established that all the process, in each project phase, should be accompanied by a specialist in ergonomics. This process as an innovation in the conception of projects in this company, signals a change of culture, and, for this reason requires broad dissemination throughout the several company leadership levels, and training of professionals in projects of ergonomics design. An implementation plan was also prepared and approved by the corporate governance, complementing the proposed challenge. In this way, this major oil company will implement new procedures of ergonomics design to promote health, safety, and wellbeing of the workforce, besides improving the performance and reliability of its systems and processes.

  7. NASA/Navy Benchmarking Exchange (NNBE). Volume 1. Interim Report. Navy Submarine Program Safety Assurance

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.

  8. MIDAS, prototype Multivariate Interactive Digital Analysis System, phase 1. Volume 3: Wiring diagrams

    NASA Technical Reports Server (NTRS)

    Kriegler, F. J.; Christenson, D.; Gordon, M.; Kistler, R.; Lampert, S.; Marshall, R.; Mclaughlin, R.

    1974-01-01

    The Midas System is a third-generation, fast, multispectral recognition system able to keep pace with the large quantity and high rates of data acquisition from present and projected sensors. A principal objective of the MIDAS Program is to provide a system well interfaced with the human operator and thus to obtain large overall reductions in turn-around time and significant gains in throughput. The hardware and software generated in Phase I of the overall program are described. The system contains a mini-computer to control the various high-speed processing elements in the data path and a classifier which implements an all-digital prototype multivariate-Gaussian maximum likelihood decision algorithm operating at 2 x 100,000 pixels/sec. Sufficient hardware was developed to perform signature extraction from computer-compatible tapes, compute classifier coefficients, control the classifier operation, and diagnose operation. The MIDAS construction and wiring diagrams are given.

  9. Quantum vertex model for reversible classical computing.

    PubMed

    Chamon, C; Mucciolo, E R; Ruckenstein, A E; Yang, Z-C

    2017-05-12

    Mappings of classical computation onto statistical mechanics models have led to remarkable successes in addressing some complex computational problems. However, such mappings display thermodynamic phase transitions that may prevent reaching solution even for easy problems known to be solvable in polynomial time. Here we map universal reversible classical computations onto a planar vertex model that exhibits no bulk classical thermodynamic phase transition, independent of the computational circuit. Within our approach the solution of the computation is encoded in the ground state of the vertex model and its complexity is reflected in the dynamics of the relaxation of the system to its ground state. We use thermal annealing with and without 'learning' to explore typical computational problems. We also construct a mapping of the vertex model into the Chimera architecture of the D-Wave machine, initiating an approach to reversible classical computation based on state-of-the-art implementations of quantum annealing.

  10. Quantum vertex model for reversible classical computing

    NASA Astrophysics Data System (ADS)

    Chamon, C.; Mucciolo, E. R.; Ruckenstein, A. E.; Yang, Z.-C.

    2017-05-01

    Mappings of classical computation onto statistical mechanics models have led to remarkable successes in addressing some complex computational problems. However, such mappings display thermodynamic phase transitions that may prevent reaching solution even for easy problems known to be solvable in polynomial time. Here we map universal reversible classical computations onto a planar vertex model that exhibits no bulk classical thermodynamic phase transition, independent of the computational circuit. Within our approach the solution of the computation is encoded in the ground state of the vertex model and its complexity is reflected in the dynamics of the relaxation of the system to its ground state. We use thermal annealing with and without `learning' to explore typical computational problems. We also construct a mapping of the vertex model into the Chimera architecture of the D-Wave machine, initiating an approach to reversible classical computation based on state-of-the-art implementations of quantum annealing.

  11. From MAD to SAD: The Italian experience for the low-frequency aperture array of SKA1-LOW

    NASA Astrophysics Data System (ADS)

    Bolli, P.; Pupillo, G.; Virone, G.; Farooqui, M. Z.; Lingua, A.; Mattana, A.; Monari, J.; Murgia, M.; Naldi, G.; Paonessa, F.; Perini, F.; Pluchino, S.; Rusticelli, S.; Schiaffino, M.; Schillirò, F.; Tartarini, G.; Tibaldi, A.

    2016-03-01

    This paper describes two small aperture array demonstrators called Medicina and Sardinia Array Demonstrators (MAD and SAD, respectively). The objectives of these instruments are to acquire experience and test new technologies for a possible application to the low-frequency aperture array of the low-frequency telescope of the Square Kilometer Array phase 1 (SKA1-LOW). The MAD experience was concluded in 2014, and it turned out to be an important test bench for implementing calibration techniques based on an artificial source mounted in an aerial vehicle. SAD is based on 128 dual-polarized Vivaldi antennas and is 1 order of magnitude larger than MAD. The architecture and the station size of SAD, which is along the construction phase, are more similar to those under evaluation for SKA1-LOW, and therefore, SAD is expected to provide useful hints for SKA1-LOW.

  12. Phase Time and Envelope Time in Time-Distance Analysis and Acoustic Imaging

    NASA Technical Reports Server (NTRS)

    Chou, Dean-Yi; Duvall, Thomas L.; Sun, Ming-Tsung; Chang, Hsiang-Kuang; Jimenez, Antonio; Rabello-Soares, Maria Cristina; Ai, Guoxiang; Wang, Gwo-Ping; Goode Philip; Marquette, William; hide

    1999-01-01

    Time-distance analysis and acoustic imaging are two related techniques to probe the local properties of solar interior. In this study, we discuss the relation of phase time and envelope time between the two techniques. The location of the envelope peak of the cross correlation function in time-distance analysis is identified as the travel time of the wave packet formed by modes with the same w/l. The phase time of the cross correlation function provides information of the phase change accumulated along the wave path, including the phase change at the boundaries of the mode cavity. The acoustic signals constructed with the technique of acoustic imaging contain both phase and intensity information. The phase of constructed signals can be studied by computing the cross correlation function between time series constructed with ingoing and outgoing waves. In this study, we use the data taken with the Taiwan Oscillation Network (TON) instrument and the Michelson Doppler Imager (MDI) instrument. The analysis is carried out for the quiet Sun. We use the relation of envelope time versus distance measured in time-distance analyses to construct the acoustic signals in acoustic imaging analyses. The phase time of the cross correlation function of constructed ingoing and outgoing time series is twice the difference between the phase time and envelope time in time-distance analyses as predicted. The envelope peak of the cross correlation function between constructed ingoing and outgoing time series is located at zero time as predicted for results of one-bounce at 3 mHz for all four data sets and two-bounce at 3 mHz for two TON data sets. But it is different from zero for other cases. The cause of the deviation of the envelope peak from zero is not known.

  13. Integrating evidence-based practices for increasing cancer screenings in safety net health systems: a multiple case study using the Consolidated Framework for Implementation Research.

    PubMed

    Liang, Shuting; Kegler, Michelle C; Cotter, Megan; Emily, Phillips; Beasley, Derrick; Hermstad, April; Morton, Rentonia; Martinez, Jeremy; Riehman, Kara

    2016-08-02

    Implementing evidence-based practices (EBPs) to increase cancer screenings in safety net primary care systems has great potential for reducing cancer disparities. Yet there is a gap in understanding the factors and mechanisms that influence EBP implementation within these high-priority systems. Guided by the Consolidated Framework for Implementation Research (CFIR), our study aims to fill this gap with a multiple case study of health care safety net systems that were funded by an American Cancer Society (ACS) grants program to increase breast and colorectal cancer screening rates. The initiative funded 68 safety net systems to increase cancer screening through implementation of evidence-based provider and client-oriented strategies. Data are from a mixed-methods evaluation with nine purposively selected safety net systems. Fifty-two interviews were conducted with project leaders, implementers, and ACS staff. Funded safety net systems were categorized into high-, medium-, and low-performing cases based on the level of EBP implementation. Within- and cross-case analyses were performed to identify CFIR constructs that influenced level of EBP implementation. Of 39 CFIR constructs examined, six distinguished levels of implementation. Two constructs were from the intervention characteristics domain: adaptability and trialability. Three were from the inner setting domain: leadership engagement, tension for change, and access to information and knowledge. Engaging formally appointed internal implementation leaders, from the process domain, also distinguished level of implementation. No constructs from the outer setting or individual characteristics domain differentiated systems by level of implementation. Our study identified a number of influential CFIR constructs and illustrated how they impacted EBP implementation across a variety of safety net systems. Findings may inform future dissemination efforts of EBPs for increasing cancer screening in similar settings. Moreover, our analytic approach is similar to previous case studies using CFIR and hence could facilitate comparisons across studies.

  14. Development and Validation of a Principal Implementation Practices Measure: The Principal Implementation Questionnaire

    PubMed Central

    Nettles, Stephen M.; Petscher, Yaacov

    2015-01-01

    Measurement of principal implementation behaviors has proved difficult to researchers in educational leadership due to a lack of consensus on the operational definitions of leadership constructs. The Principal Implementation Questionnaire (PIQ) was developed and validated with the intention of providing clarity in the assessment of principal leadership behaviors in the implementation of effective reading programs. Constructs were operationally defined within the context of the population of interest, with subsequent item writing centered around the constructs. A resulting calibration sample of principals from Florida Reading First schools was used to test the hypothesized measurement model to determine how well the items were described by the proposed factors. Results from LISREL analyses revealed a well-fitted model, based on numerous fit indices. PMID:26366043

  15. Mentoring a new science teacher in reform-based ways: A focus on inquiry

    NASA Astrophysics Data System (ADS)

    Schomer, Scott D.

    The processes, understandings, and uses of inquiry are identified by the National Science Education Standards (National Research Council, 1996) as a key component of science instruction. Currently, there are few examples in the literature demonstrating how teachers go about co-constructing inquiry-based activities and how mentors can promote the use of reform-based practices by novices. The purpose of this interpretive case study was to investigate how a mentor and her protege collaboratively developed, implemented and assessed three inquiry-based experiences. The questions that guided this research were: (1) How does the mentor assist protege growth in the development, implementation and assessment of inquiry-based experiences for secondary science students? (2) How are the protege's perceptions of inquiry influenced by her participation in developing, implementing and assessing inquiry-based experiences for secondary science students? The co-construction of the inquiry activities and the facilitation provided by the mentor represented Lev Vygotsky's (1978) social construction of information as the mentor guided the protege beyond her cognitive zone of proximal development. The participants in this study were a veteran science teacher who was obtaining her mentor certification, or Teacher Support Specialist, and her protege who was a science teacher in the induction phase of her career. Data were collected through in-depth, semi-structured interviews, tape recordings of planning sessions, researcher field notes, and email reflections during the co-construction process. Inductive analysis of the data led to the identification of common categories and subsequent findings, which reflected what the mentor and protege discussed about inquiry and the process of collaboration. The six themes that emerged from this study led to several implications that are significant for science teacher preparation and the mentoring community. The teachers indicated tools, such as the "Essential Features and Variations of Inquiry" table, were helpful for planning and assessing inquiry-based experiences. Examination of findings revealed how the process of purposefully collaborating on the development of inquiry-based lessons fostered a more student-centered approach to teaching and learning by the protege. Therefore, having new teachers continue to collaborate with reform-minded mentors beyond their first year of teaching may help new teachers develop inquiry-based pedagogies.

  16. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  17. Implementation of Four-Phase Interleaved Balance Charger for Series-Connected Batteries with Power Factor Correction

    NASA Astrophysics Data System (ADS)

    Juan, Y. L.; Lee, Y. T.; Lee, Y. L.; Chen, L. L.; Huang, M. L.

    2017-11-01

    A four-phase interleaved balance charger for series-connected batteries with power factor correction is proposed in this dissertation. In the two phases of two buckboost converters, the rectified ac power is firstly converted to a dc link capacitor. In the other two phases of two flyback converters, the rectified ac power is directly converted to charge the corresponding batteries. Additionally, the energy on the leakage inductance of flyback converter is bypassed to the dc link capacitor. Then, a dual-output balance charging circuit is connected to the dc link to deliver the dc link power to charge two batteries in the series-connected batteries module. The constant-current/constant-voltage charging strategy is adopted. Finally, a prototype of the proposed charger with rated power 500 W is constructed. From the experimental results, the performance and validity of the proposed topology are verified. Compared to the conventional topology with passive RCD snubber, the efficiency of the proposed topology is improved about 3% and the voltage spike on the active switch is also reduced. The efficiency of the proposed charger is at least 83.6 % within the CC/CV charging progress.

  18. Counterfactual quantum cloning without transmitting any physical particles

    NASA Astrophysics Data System (ADS)

    Guo, Qi; Zhai, Shuqin; Cheng, Liu-Yong; Wang, Hong-Fu; Zhang, Shou

    2017-11-01

    We propose a counterfactual 1 →2 economical phase-covariant cloning scheme. Compared with the existing protocols using flying qubits, the main difference of the presented scheme is that the cloning can be achieved without transmitting the photon between the two parties. In addition, this counterfactual scheme does not need to construct controlled quantum gates to perform joint logical operations between the cloned qubit and the blank copy. We also numerically evaluate the performance of the present scheme in the practical experiment, which shows this cloning scheme can be implemented with a high success of probability and the fidelity is close to the optimal value in the ideal asymptotic limit.

  19. Modulated Elliptical Slot

    NASA Technical Reports Server (NTRS)

    Abou-Khousa, M. A.

    2009-01-01

    A novel modulated slot design has been proposed and tested. The proposed slot is aimed to replace the inefficient small dipoles used in conventional MST-based imaging systems. The developed slot is very attractive as MST array element due to its small size and high efficiency/modulation depth. In fact, the developed slot has been successfully used to implement the first prototype of a microwave camera operating at 24 GHZ. It is also being used in the design of the second generation of the camera. Finally, the designed elliptical slot can be used as an electronically controlled waveguide iris for many other purposes (for instance in constructing waveguide reflective phase shifters and multiplexers/switches).

  20. Convergence Time towards Periodic Orbits in Discrete Dynamical Systems

    PubMed Central

    San Martín, Jesús; Porter, Mason A.

    2014-01-01

    We investigate the convergence towards periodic orbits in discrete dynamical systems. We examine the probability that a randomly chosen point converges to a particular neighborhood of a periodic orbit in a fixed number of iterations, and we use linearized equations to examine the evolution near that neighborhood. The underlying idea is that points of stable periodic orbit are associated with intervals. We state and prove a theorem that details what regions of phase space are mapped into these intervals (once they are known) and how many iterations are required to get there. We also construct algorithms that allow our theoretical results to be implemented successfully in practice. PMID:24736594

  1. General implementation of arbitrary nonlinear quadrature phase gates

    NASA Astrophysics Data System (ADS)

    Marek, Petr; Filip, Radim; Ogawa, Hisashi; Sakaguchi, Atsushi; Takeda, Shuntaro; Yoshikawa, Jun-ichi; Furusawa, Akira

    2018-02-01

    We propose general methodology of deterministic single-mode quantum interaction nonlinearly modifying single quadrature variable of a continuous-variable system. The methodology is based on linear coupling of the system to ancillary systems subsequently measured by quadrature detectors. The nonlinear interaction is obtained by using the data from the quadrature detection for dynamical manipulation of the coupling parameters. This measurement-induced methodology enables direct realization of arbitrary nonlinear quadrature interactions without the need to construct them from the lowest-order gates. Such nonlinear interactions are crucial for more practical and efficient manipulation of continuous quadrature variables as well as qubits encoded in continuous-variable systems.

  2. M324 : investigation of closure pour elimination for phased construction of steel girder bridges.

    DOT National Transportation Integrated Search

    2014-10-01

    Phased construction is a common practice used by State DOTs during the : replacement of a bridge. This method allows for the traffic flow to be maintained on half : of the bridge while a new deck is constructed on the other half. For steel girder bri...

  3. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... standards that they have promulgated to implement CEQ's regulations. Sustainable Development ...

  4. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... standards that they have promulgated to implement CEQ's regulations. Sustainable Development ...

  5. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... standards that they have promulgated to implement CEQ's regulations. Sustainable Development ...

  6. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... standards that they have promulgated to implement CEQ's regulations. Sustainable Development ...

  7. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  8. Cryptosystem for Securing Image Encryption Using Structured Phase Masks in Fresnel Wavelet Transform Domain

    NASA Astrophysics Data System (ADS)

    Singh, Hukum

    2016-12-01

    A cryptosystem for securing image encryption is considered by using double random phase encoding in Fresnel wavelet transform (FWT) domain. Random phase masks (RPMs) and structured phase masks (SPMs) based on devil's vortex toroidal lens (DVTL) are used in spatial as well as in Fourier planes. The images to be encrypted are first Fresnel transformed and then single-level discrete wavelet transform (DWT) is apply to decompose LL,HL, LH and HH matrices. The resulting matrices from the DWT are multiplied by additional RPMs and the resultants are subjected to inverse DWT for the encrypted images. The scheme is more secure because of many parameters used in the construction of SPM. The original images are recovered by using the correct parameters of FWT and SPM. Phase mask SPM based on DVTL increases security that enlarges the key space for encryption and decryption. The proposed encryption scheme is a lens-less optical system and its digital implementation has been performed using MATLAB 7.6.0 (R2008a). The computed value of mean-squared-error between the retrieved and the input images shows the efficacy of scheme. The sensitivity to encryption parameters, robustness against occlusion, entropy and multiplicative Gaussian noise attacks have been analysed.

  9. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    PubMed

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  10. Coupled structural, thermal, phase-change and electromagnetic analysis for superconductors, volume 1

    NASA Technical Reports Server (NTRS)

    Felippa, Carlos A.; Farhat, Charbel; Park, K. C.; Militello, Carmelo; Schuler, James J.

    1993-01-01

    This research program has dealt with the theoretical development and computer implementation of reliable and efficient methods for the analysis of coupled mechanical problems that involve the interaction of mechanical, thermal, phase-change and electromagnetic subproblems. The focus application has been the modeling of superconductivity and associated quantum-state phase-change phenomena. In support of this objective the work has addressed the following issues: (1) development of variational principles for finite elements; (2) finite element modeling of the electromagnetic problem; (3) coupling of thermal and mechanical effects; and (4) computer implementation and solution of the superconductivity transition problem. The research was carried out over the period September 1988 through March 1993. The main accomplishments have been: (1) the development of the theory of parametrized and gauged variational principles; (2) the application of those principled to the construction of electromagnetic, thermal and mechanical finite elements; and (3) the coupling of electromagnetic finite elements with thermal and superconducting effects; and (4) the first detailed finite element simulations of bulk superconductors, in particular the Meissner effect and the nature of the normal conducting boundary layer. The grant has fully supported the thesis work of one doctoral student (James Schuler, who started on January 1989 and completed on January 1993), and partly supported another thesis (Carmelo Militello, who started graduate work on January 1988 completing on August 1991). Twenty-three publications have acknowledged full or part support from this grant, with 16 having appeared in archival journals and 3 in edited books or proceedings.

  11. The development of a program analysis environment for Ada: Reverse engineering tools for Ada

    NASA Technical Reports Server (NTRS)

    Cross, James H., II

    1991-01-01

    The Graphical Representations of Algorithms, Structures, and Processes for Ada (GRASP/Ada) has successfully created and prototyped a new algorithm level graphical representation for Ada software, the Control Structure Diagram (CSD). The primary impetus for creation of the CSD was to improve the comprehension efficiency of Ada software and thus improve reliability and reduce costs. The emphasis was on the automatic generation of the CSD from Ada source code to support reverse engineering and maintenance. The CSD has the potential to replace traditional prettyprinted Ada source code. In Phase 1 of the GRASP/Ada project, the CSD graphical constructs were created and applied manually to several small Ada programs. A prototype (Version 1) was designed and implemented using FLEX and BISON running under the Virtual Memory System (VMS) on a VAX 11-780. In Phase 2, the prototype was improved and ported to the Sun 4 platform under UNIX. A user interface was designed and partially implemented. The prototype was applied successfully to numerous Ada programs ranging in size from several hundred to several thousand lines of source code. In Phase 3 of the project, the prototype was prepared for limited distribution (GRASP/Ada Version 3.0) to facilitate evaluation. The user interface was extensively reworked. The current prototype provides the capability for the user to generate CSD from Ada source code in a reverse engineering mode with a level of flexibility suitable for practical application.

  12. The Abbott School Construction Program: NJ Department of Education Proposed Facilities Regulations. Analysis of Preschool Issues

    ERIC Educational Resources Information Center

    Ponessa, Joan; Boylan, Ellen

    2004-01-01

    This report on preschool facilities analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State Supreme Court's…

  13. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    NASA Astrophysics Data System (ADS)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  14. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention.

    PubMed

    Zoellner, Jamie M; Porter, Kathleen J; Chen, Yvonnes; Hedrick, Valisa E; You, Wen; Hickman, Maja; Estabrooks, Paul A

    2017-05-01

    Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13-20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6-38%) and behaviour (average 30%, range 6-55%) were significant. Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases.

  15. Reducing Physical Risk Factors in Construction Work Through a Participatory Intervention: Protocol for a Mixed-Methods Process Evaluation.

    PubMed

    Ajslev, Jeppe; Brandt, Mikkel; Møller, Jeppe Lykke; Skals, Sebastian; Vinstrup, Jonas; Jakobsen, Markus Due; Sundstrup, Emil; Madeleine, Pascal; Andersen, Lars Louis

    2016-05-26

    Previous research has shown that reducing physical workload among workers in the construction industry is complicated. In order to address this issue, we developed a process evaluation in a formative mixed-methods design, drawing on existing knowledge of the potential barriers for implementation. We present the design of a mixed-methods process evaluation of the organizational, social, and subjective practices that play roles in the intervention study, integrating technical measurements to detect excessive physical exertion measured with electromyography and accelerometers, video documentation of working tasks, and a 3-phased workshop program. The evaluation is designed in an adapted process evaluation framework, addressing recruitment, reach, fidelity, satisfaction, intervention delivery, intervention received, and context of the intervention companies. Observational studies, interviews, and questionnaires among 80 construction workers organized in 20 work gangs, as well as health and safety staff, contribute to the creation of knowledge about these phenomena. At the time of publication, the process of participant recruitment is underway. Intervention studies are challenging to conduct and evaluate in the construction industry, often because of narrow time frames and ever-changing contexts. The mixed-methods design presents opportunities for obtaining detailed knowledge of the practices intra-acting with the intervention, while offering the opportunity to customize parts of the intervention.

  16. Teacher change in implementing a research-developed representation construction pedagogy

    NASA Astrophysics Data System (ADS)

    Hubber, Peter; Chittleborough, Gail

    2016-05-01

    The Representations in Learning Science (RiLS) project developed a representation construction approach to teaching and learning in science, which has successfully demonstrated enhanced student learning through sustained engagement with ideas, and enhancement of teachers' pedagogical knowledge and understandings of how knowledge in science is developed and communicated. The current Constructing Representations in Science Pedagogy (CRISP) project aims at wider scale implementation of the representation construction approach. This paper explores a range of issues that confronted four Year-8 teachers in implementing this research-developed approach, such as: preparedness of the teacher in terms of epistemological positioning and positioning as a learner, significant support for planning and modelling by the university expert, and a team ethos where teachers share ideas and plan jointly. The Year-8 teachers implemented a representation construction approach to the teaching of the topic of astronomy. The Interconnected Model of Teacher Growth (IMTG) (Clarke and Hollingworth, Teach. Educ., 18 (2001) 947) was used to analyse the teachers' experience in planning and delivering the teaching sequence. This model was found to be flexible in identifying the experiences of teachers in different situations and useful in identifying issues for implementation of a research-developed pedagogy.

  17. Pitfalls and feedback when constructing topological pressure-temperature phase diagrams

    NASA Astrophysics Data System (ADS)

    Ceolin, R.; Toscani, S.; Rietveld, Ivo B.; Barrio, M.; Tamarit, J. Ll.

    2017-04-01

    The stability hierarchy between different phases of a chemical compound can be accurately reproduced in a topological phase diagram. This type of phase diagrams may appear to be the result of simple extrapolations, however, experimental complications quickly increase in the case of crystalline trimorphism (and higher order polymorphism). To ensure the accurate positioning of stable phase domains, a topological phase diagram needs to be consistent. This paper gives an example of how thermodynamic feedback can be used in the topological construction of phase diagrams to ensure overall consistency in a phase diagram based on the case of piracetam crystalline trimorphism.

  18. Development of a Ground Test and Analysis Protocol to Support NASA's NextSTEP Phase 2 Habitation Concepts

    NASA Technical Reports Server (NTRS)

    Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Gernhardt, Michael L.

    2018-01-01

    The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.

  19. Phased Antenna Array for Global Navigation Satellite System Signals

    NASA Technical Reports Server (NTRS)

    Turbiner, Dmitry (Inventor)

    2015-01-01

    Systems and methods for phased array antennas are described. Supports for phased array antennas can be constructed by 3D printing. The array elements and combiner network can be constructed by conducting wire. Different parameters of the antenna, like the gain and directivity, can be controlled by selection of the appropriate design, and by electrical steering. Phased array antennas may be used for radio occultation measurements.

  20. Optimizing and controlling earthmoving operations using spatial technologies

    NASA Astrophysics Data System (ADS)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.

  1. Update of GRASP/Ada reverse engineering tools for Ada

    NASA Technical Reports Server (NTRS)

    Cross, James H., II

    1992-01-01

    The GRASP/Ada project (Graphical Representations of Algorithms, Structures, and Processes for Ada) has successfully created and prototyped a new algorithmic level graphical representation of Ada software, the Control Structure Diagram (CSD). The primary impetus for creation of the CSD was to improve the comprehension efficiency of Ada software and, as a result, improve reliability and reduce costs. The emphasis was on the automatic generation of the CSD from Ada PDL or source code to support reverse engineering and maintenance. The CSD has the potential to replace traditional prettyprinted Ada source code. In Phase 1 of the GRASP/Ada project, the CSD graphical constructs were created and applied manually to several small Ada programs. A prototype (Version 1) was designed and implemented using FLEX and BISON running under VMS on a VAS 11-780. In Phase 2, the prototype was improved and ported to the Sun 4 platform under UNIX. A user interface was designed and partially implemented using the HP widget toolkit and the X Windows System. In Phase 3, the user interface was extensively reworked using the Athena widget toolkit and X Windows. The prototype was applied successfully to numerous Ada programs ranging in size from several hundred to several thousand lines of source code. Following Phase 3, the prototype was evaluated by software engineering students at Auburn University and then updated with significant enhancements to the user interface including editing capabilities. Version 3.2 of the prototype was prepared for limited distribution to facilitate further evaluation. The current prototype provides the capability for the user to generate CSD's from Ada PDL or source code in a reverse engineering as well as forward engineering mode with a level of flexibility suitable for practical application.

  2. Development and validation of a fatigue assessment scale for U.S. construction workers.

    PubMed

    Zhang, Mingzong; Sparer, Emily H; Murphy, Lauren A; Dennerlein, Jack T; Fang, Dongping; Katz, Jeffrey N; Caban-Martinez, Alberto J

    2015-02-01

    To develop a fatigue assessment scale and test its reliability and validity for commercial construction workers. Using a two-phased approach, we first identified items (first phase) for the development of a Fatigue Assessment Scale for Construction Workers (FASCW) through review of existing scales in the scientific literature, key informant interviews (n = 11) and focus groups (three groups with six workers each) with construction workers. The second phase included assessment for the reliability, validity, and sensitivity of the new scale using a repeated-measures study design with a convenience sample of construction workers (n = 144). Phase one resulted in a 16-item preliminary scale that after factor analysis yielded a final 10-item scale with two sub-scales ("Lethargy" and "Bodily Ailment"). During phase two, the FASCW and its subscales demonstrated satisfactory internal consistency (alpha coefficients were FASCW [0.91], Lethargy [0.86] and Bodily Ailment [0.84]) and acceptable test-retest reliability (Pearson Correlations Coefficients: 0.59-0.68; Intraclass Correlation Coefficients: 0.74-0.80). Correlation analysis substantiated concurrent and convergent validity. A discriminant analysis demonstrated that the FASCW differentiated between groups with arthritis status and different work hours. The 10-item FASCW with good reliability and validity is an effective tool for assessing the severity of fatigue among construction workers. © 2015 Wiley Periodicals, Inc.

  3. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  4. The Study of the Phase Characteristics of Bragg Cells for Acousto-Optic Signal Processing

    DTIC Science & Technology

    1998-01-01

    contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical parameters. Design a...Braggcell TeO2 with minimal phase distortions operating near 100 MHz. Experimentally investigate the phase characteristics for a Bragg cell on TeO2 ...follows: The contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical

  5. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    ERIC Educational Resources Information Center

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  6. Monolithic circuits for barium fluoride detectors used in nuclear physics experiments. CRADA final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Varner, R.L.; Blankenship, J.L.; Beene, J.R.

    1998-02-01

    Custom monolithic electronic circuits have been developed recently for large detector applications in high energy physics where subsystems require tens of thousands of channels of signal processing and data acquisition. In the design and construction of these enormous detectors, it has been found that monolithic circuits offer significant advantages over discrete implementations through increased performance, flexible packaging, lower power and reduced cost per channel. Much of the integrated circuit design for the high energy physics community is directly applicable to intermediate energy heavy-ion and electron physics. This STTR project conducted in collaboration with researchers at the Holifield Radioactive Ion Beammore » Facility (HRIBF) at Oak Ridge National Laboratory, sought to develop a new integrated circuit chip set for barium fluoride (BaF{sub 2}) detector arrays based upon existing CMOS monolithic circuit designs created for the high energy physics experiments. The work under the STTR Phase 1 demonstrated through the design, simulation, and testing of several prototype chips the feasibility of using custom CMOS integrated circuits for processing signals from BaF{sub 2} detectors. Function blocks including charge-sensitive amplifiers, comparators, one shots, time-to-amplitude converters, analog memory circuits and buffer amplifiers were implemented during Phase 1 effort. Experimental results from bench testing and laboratory testing with sources were documented.« less

  7. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less

  8. Implementing team huddles in small rural hospitals: How does the Kotter model of change apply?

    PubMed

    Baloh, Jure; Zhu, Xi; Ward, Marcia M

    2017-12-17

    To examine how the process of change prescribed in Kotter's change model applies in implementing team huddles, and to assess the impact of the execution of early change phases on change success in later phases. Kotter's model can help to guide hospital leaders to implement change and potentially to improve success rates. However, the model is under studied, particularly in health care. We followed eight hospitals implementing team huddles for 2 years, interviewing the change teams quarterly to inquire about implementation progress. We assessed how the hospitals performed in the three overarching phases of the Kotter model, and examined whether performance in the initial phase influenced subsequent performance. In half of the hospitals, change processes were congruent with Kotter's model, where performance in the initial phase influenced their success in subsequent phases. In other hospitals, change processes were incongruent with the model, and their success depended on implementation scope and the strategies employed. We found mixed support for the Kotter model. It better fits implementation that aims to spread to multiple hospital units. When the scope is limited, changes can be successful even when steps are skipped. Kotter's model can be a useful guide for nurse managers implementing changes. © 2017 John Wiley & Sons Ltd.

  9. System Analysis in Instructional Programming: The Initial Phases of the Program Construction Process.

    ERIC Educational Resources Information Center

    Bjerstedt, Ake

    A three-volume series describes the construction of a self-instructional system as a work process with three main phases: system analysis, system synthesis, and system modification and evaluation. After an introductory discussion of some basic principles of instructional programing, this first volume focuses on the system analysis phase,…

  10. SIMULATION OF ASTRONOMICAL IMAGES FROM OPTICAL SURVEY TELESCOPES USING A COMPREHENSIVE PHOTON MONTE CARLO APPROACH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, J. R.; Peng, E.; Ahmad, Z.

    2015-05-15

    We present a comprehensive methodology for the simulation of astronomical images from optical survey telescopes. We use a photon Monte Carlo approach to construct images by sampling photons from models of astronomical source populations, and then simulating those photons through the system as they interact with the atmosphere, telescope, and camera. We demonstrate that all physical effects for optical light that determine the shapes, locations, and brightnesses of individual stars and galaxies can be accurately represented in this formalism. By using large scale grid computing, modern processors, and an efficient implementation that can produce 400,000 photons s{sup −1}, we demonstratemore » that even very large optical surveys can be now be simulated. We demonstrate that we are able to (1) construct kilometer scale phase screens necessary for wide-field telescopes, (2) reproduce atmospheric point-spread function moments using a fast novel hybrid geometric/Fourier technique for non-diffraction limited telescopes, (3) accurately reproduce the expected spot diagrams for complex aspheric optical designs, and (4) recover system effective area predicted from analytic photometry integrals. This new code, the Photon Simulator (PhoSim), is publicly available. We have implemented the Large Synoptic Survey Telescope design, and it can be extended to other telescopes. We expect that because of the comprehensive physics implemented in PhoSim, it will be used by the community to plan future observations, interpret detailed existing observations, and quantify systematics related to various astronomical measurements. Future development and validation by comparisons with real data will continue to improve the fidelity and usability of the code.« less

  11. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    NASA Astrophysics Data System (ADS)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  12. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    DOT National Transportation Integrated Search

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  13. Optoacoustic Microscopy for Investigation of Material Nanostructures-Embracing the Ultrasmall, Ultrafast, and the Invisible

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nurmikko, Arto; Humphrey, Maris

    2014-07-10

    The goal of this grant was the development of a new type of scanning acoustic microscope for nanometer resolution ultrasound imaging, based on ultrafast optoacoustics (>GHz). In the microscope, subpicosecond laser pulses was used to generate and detect very high frequency ultrasound with nanometer wavelengths. We report here on the outcome of the 3-year DOE/BES grant which involved the design, multifaceted construction, and proof-of-concept demonstration of an instrument that can be used for quantitative imaging of nanoscale material features – including features that may be buried so as to be inaccessible to conventional lightwave or electron microscopies. The research programmore » has produced a prototype scanning optoacoustic microscope which, in combination with advanced computational modeling, is a system-level new technology (two patents issues) which offer novel means for precision metrology of material nanostructures, particularly those that are of contemporary interest to the frontline micro- and optoelectronics device industry. For accomplishing the ambitious technical goals, the research roadmap was designed and implemented in two phases. In Phase I, we constructed a “non-focusing” optoacoustic microscope instrument (“POAM”), with nanometer vertical (z-) resolution, while limited to approximately 10 micrometer scale lateral recolution. The Phase I version of the instrument which was guided by extensive acoustic and optical numerical modeling of the basic underlying acoustic and optical physics, featured nanometer scale close loop positioning between the optoacoustic transducer element and a nanostructured material sample under investigation. In phase II, we implemented and demonstrated a scanning version of the instrument (“SOAM”) where incident acoustic energy is focused, and scanned on lateral (x-y) spatial scale in the 100 nm range as per the goals of the project. In so doing we developed advanced numerical simulations to provide computational models of the focusing of multi-GHz acoustic waves to the nanometer scale and innovated a series fabrication approaches for a new type of broadband high-frequency acoustic focusing microscope objective by applying methods on nanoimprinting and focused-ion beam techniques. In the following, the Phase I and Phase II instrument development is reported as Section II. The first segment of this section describes the POAM instrument and its development, while including much of the underlying ultrafast acoustic physics which is common to all of our work for this grant. Then, the science and engineering of the SOAM instrument is described, including the methods of fabricating new types of acoustic microlenses. The results section is followed by reports on publications (Section III), Participants (Section IV), and statement of full use of the allocated grant funds (Section V).« less

  14. The Biolink Implantable Telemetry System

    NASA Technical Reports Server (NTRS)

    Betancourt-Zamora, Rafael J.

    1999-01-01

    Most biotelemetry applications deal with the moderated data rates of biological signals. Few people have studied the problem of transcutaneous data transmission at the rates required by NASA's Life Sciences-Advanced BioTelemetry System (LS-ABTS). Implanted telemetry eliminate the problems associated with wire breaking the skin, and permits experiments with awake and unrestrained subjects. Our goal is to build a low-power 174-216MHz Radio Frequency (RF) transmitter suitable for short range biosensor and implantable use. The BioLink Implantable Telemetry System (BITS) is composed of three major units: an Analog Data Module (ADM), a Telemetry Transmitter Module (TTM), and a Command Receiver Module (CRM). BioLink incorporates novel low-power techniques to implement a monolithic digital RF transmitter operating at 100kbps, using quadrature phase shift keying (QPSK) modulation in the 174-216MHz ISM band. As the ADM will be specific for each application, we focused on solving the problems associated with a monolithic implementation of the TTM and CRM, and this is the emphasis of this report. A system architecture based on a Frequency-Locked Loop (FLL) Frequency Synthesizer is presented, and a novel differential frequency that eliminates the need for a frequency divider is also shown. A self sizing phase modulation scheme suitable for low power implementation was also developed. A full system-level simulation of the FLL was performed and loop filter parameters were determined. The implantable antenna has been designed, simulated and constructed. An implant package compatible with the ABTS requirements is also being proposed. Extensive work performed at 200MHz in 0.5um complementary metal oxide semiconductors (CMOS) showed the feasibility of integrating the RF transmitter circuits in a single chip. The Hajimiri phase noise model was used to optimize the Voltage Controlled Oscillator (VCO) for minimum power consumption. Two test chips were fabricated in a 0.5pm, 3V CMOS process. Measured phase noise for a 1.5mW, 200MHz ring oscillator VCO is -80dBc/Hz at 100KHZ offset, showing good agreement with the theory. We also propose a novel superregenerative receiver architecture for implementing the command receiver. The superregenerative receiver's simplicity, low cost, and low power consumption has made it the receiver of choice for short-distance data communications, remote control and home automation. We present the design of a superregenerative AM receiver implemented in a 0.5um CMOS technology that operates at 433.92MHz and dissipates only 300uW. Further work entails detailed transistor-level design of the FLL and superregenerative receiver and a monolithic implementation of an implantable transceiver in 0.5um CMOS technology.

  15. An overview of knowledge management (KM) issues for implementation in consultant firms in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Othman, Azlan; Ismail, Syuhaida; Yahya, Khairulzan

    2017-12-01

    In the past few years, there has been a growing interest in treating knowledge as a significant organisational resource. Thus, effective development and implementation of KM requires a foundation in several rich literatures. As a preparation for the competitive industrial nation, KM is an important countenance that should be the point of convergence for the industry players. This paper wishes to draw the attention on the current situation of KM practice, focusing on consultant firms in Malaysian construction industry. Questionnaires were distributed to about 200 respondents working in the industry, with the objective of appraising the KM implementation amongst consultant firms working in construction industry in Malaysia. This paper also gives the overview on KM definition, process, understanding and challenges in construction industry, besides the critical success factor of KM implementation. The literature is restricted on the recent KM study of 17 years research from 2000 to 2017. Finally, this paper proposes the conceptual ideas of relationship between KM process, KM understanding and KM challenges with critical success factor of KM implementation.

  16. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    EPA Pesticide Factsheets

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  17. Efficacy-Information for Implementing Learning in Construction

    ERIC Educational Resources Information Center

    Nesan, L. Jawahar

    2004-01-01

    This paper, while emphasizing the linkage between the concepts of "empowerment" and "learning", argues that empowerment provides the most appropriate base to effectively implement learning in construction organizations. It is argued that "efficacy-information", being a derivative of empowerment, helps influence…

  18. Black holes of dimensionally continued gravity coupled to Born-Infeld electromagnetic field

    NASA Astrophysics Data System (ADS)

    Meng, Kun; Yang, Da-Bao

    2018-05-01

    In this paper, for dimensionally continued gravity coupled to Born-Infeld electromagnetic field, we construct topological black holes in diverse dimensions and construct dyonic black holes in general even dimensions. We study thermodynamics of the black holes and obtain first laws. We study thermal phase transitions of the black holes in T-S plane and find van der Waals-like phase transitions for even-dimensional spherical black holes, such phase transitions are not found for other types of black holes constructed in this paper.

  19. ICP MS selection of radiopure materials for the GERDA experiment

    NASA Astrophysics Data System (ADS)

    di Vacri, M. L.; Nisi, S.; Cattadori, C.; Janicsko, J.; Lubashevskiy, A.; Smolnikov, A.; Walter, M.

    2015-08-01

    The GERDA (GERmanium Detector Array) experiment, located in the Gran Sasso Underground Laboratory (LNGS, Italy) aims to search for neutrinoless double beta (0νββ) decay of the 76Ge isotope. Both an ultra-low radioactivity background environment and active techniques to abate the residual background are required to reach the background index (of 10-3 counts/keV kg y) at the Qββ. In order to veto and suppress those events that partially deposit energy in Ge detectors, the readout of liquid argon (LAr) scintillation light (SL) has been implemented for the second GERDA experimental Phase. A double veto system has been designed and constructed using highly radiopure materials (scintillating fibers, wavelength shifters, polymeric foils, reflective foils). This work describes the study of lead, thorium and uranium ultra-trace content, performed at the LNGS Chemistry Laboratory by High Resolution Mass Spectrometry (HR ICP MS), for the selection of all materials involved in the construction of the veto system

  20. Combination of graph heuristics in producing initial solution of curriculum based course timetabling problem

    NASA Astrophysics Data System (ADS)

    Wahid, Juliana; Hussin, Naimah Mohd

    2016-08-01

    The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution. This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions. The graph heuristics were set as single and combination of two heuristics. In addition, several ways of assigning courses into room and timeslot are implemented. All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced. The result shows that combination of saturation degree followed by largest degree heuristic produce the highest number of population of initial solutions. The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions.

  1. The NEW detector: construction, commissioning and first results

    NASA Astrophysics Data System (ADS)

    Nebot-Guinot, M.; NEXT Collaboration

    2017-09-01

    NEXT (Neutrino Experiment with a Xenon TPC) is a neutrinoless double-beta (ββ0ν) decay experiment at the Canfranc Underground Laboratory (LSC). It seeks to detect the ββ0ν decay of Xe-136 using a high pressure xenon gas TPC with electroluminescent (EL) amplification. The NEXT-White (NEW) detector, with an active xenon mass of about 10 kg at 15 bar, is the first NEXT prototype installed at LSC. It implements the NEXT detector concept tested in smaller prototypes using the same radiopure sensors and materials that will be used in the future NEXT-100, serving as a benchmark for technical solutions as well as for the signal selection and background rejection algorithms. NEW is currently under commissioning at the LSC. In this poster proceedings we describe the technical solutions adopted for NEW construction, the lessons learned from the commissioning phase, and the first results on energy calibration and energy resolution obtained with low-energy radioactive source data.

  2. ENCOMPASS: A SAGA based environment for the compositon of programs and specifications, appendix A

    NASA Technical Reports Server (NTRS)

    Terwilliger, Robert B.; Campbell, Roy H.

    1985-01-01

    ENCOMPASS is an example integrated software engineering environment being constructed by the SAGA project. ENCOMPASS supports the specification, design, construction and maintenance of efficient, validated, and verified programs in a modular programming language. The life cycle paradigm, schema of software configurations, and hierarchical library structure used by ENCOMPASS is presented. In ENCOMPASS, the software life cycle is viewed as a sequence of developments, each of which reuses components from the previous ones. Each development proceeds through the phases planning, requirements definition, validation, design, implementation, and system integration. The components in a software system are modeled as entities which have relationships between them. An entity may have different versions and different views of the same project are allowed. The simple entities supported by ENCOMPASS may be combined into modules which may be collected into projects. ENCOMPASS supports multiple programmers and projects using a hierarchical library system containing a workspace for each programmer; a project library for each project, and a global library common to all projects.

  3. ICP MS selection of radiopure materials for the GERDA experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Vacri, M. L., E-mail: divacrim@lngs.infn.it; Dipartimento di Scienze Fisiche e Chimiche, University of L’Aquila, via Vetoio, 67100 L’Aquila; Nisi, S., E-mail: nisi@lngs.infn.it

    2015-08-17

    The GERDA (GERmanium Detector Array) experiment, located in the Gran Sasso Underground Laboratory (LNGS, Italy) aims to search for neutrinoless double beta (0νββ) decay of the {sup 76}Ge isotope. Both an ultra-low radioactivity background environment and active techniques to abate the residual background are required to reach the background index (of 10{sup −3} counts/keV kg y) at the Q{sub ββ}. In order to veto and suppress those events that partially deposit energy in Ge detectors, the readout of liquid argon (LAr) scintillation light (SL) has been implemented for the second GERDA experimental Phase. A double veto system has been designedmore » and constructed using highly radiopure materials (scintillating fibers, wavelength shifters, polymeric foils, reflective foils). This work describes the study of lead, thorium and uranium ultra-trace content, performed at the LNGS Chemistry Laboratory by High Resolution Mass Spectrometry (HR ICP MS), for the selection of all materials involved in the construction of the veto system.« less

  4. Greenhouse Gas Emissions from Asphalt Pavement Construction: A Case Study in China

    PubMed Central

    Ma, Feng; Sha, Aimin; Lin, Ruiyu; Huang, Yue; Wang, Chao

    2016-01-01

    In China, the construction of asphalt pavement has a significant impact on the environment, and energy use and greenhouse gas (GHG) emissions from asphalt pavement construction have been receiving increasing attention in recent years. At present, there is no universal criterion for the evaluation of GHG emissions in asphalt pavement construction. This paper proposes to define the system boundaries for GHG emissions from asphalt pavement by using a process-based life cycle assessment method. A method for evaluating GHG emissions from asphalt pavement construction is suggested. The paper reports a case study of GHG emissions from a typical asphalt pavement construction project in China. The results show that the greenhouse gas emissions from the mixture mixing phase are the highest, and account for about 54% of the total amount. The second highest GHG emission phase is the production of raw materials. For GHG emissions of cement stabilized base/subbase, the production of raw materials emits the most, about 98%. The GHG emission for cement production alone is about 92%. The results indicate that any measures to reduce GHG emissions from asphalt pavement construction should be focused on the raw materials manufacturing stage. If the raw materials production phase is excluded, the measures to reduce GHG emissions should be aimed at the mixture mixing phase. PMID:27011196

  5. Greenhouse Gas Emissions from Asphalt Pavement Construction: A Case Study in China.

    PubMed

    Ma, Feng; Sha, Aimin; Lin, Ruiyu; Huang, Yue; Wang, Chao

    2016-03-22

    In China, the construction of asphalt pavement has a significant impact on the environment, and energy use and greenhouse gas (GHG) emissions from asphalt pavement construction have been receiving increasing attention in recent years. At present, there is no universal criterion for the evaluation of GHG emissions in asphalt pavement construction. This paper proposes to define the system boundaries for GHG emissions from asphalt pavement by using a process-based life cycle assessment method. A method for evaluating GHG emissions from asphalt pavement construction is suggested. The paper reports a case study of GHG emissions from a typical asphalt pavement construction project in China. The results show that the greenhouse gas emissions from the mixture mixing phase are the highest, and account for about 54% of the total amount. The second highest GHG emission phase is the production of raw materials. For GHG emissions of cement stabilized base/subbase, the production of raw materials emits the most, about 98%. The GHG emission for cement production alone is about 92%. The results indicate that any measures to reduce GHG emissions from asphalt pavement construction should be focused on the raw materials manufacturing stage. If the raw materials production phase is excluded, the measures to reduce GHG emissions should be aimed at the mixture mixing phase.

  6. Development and preliminary testing of a self-rating instrument to measure self-directed learning ability of nursing students.

    PubMed

    Cheng, Su-Fen; Kuo, Chien-Lin; Lin, Kuan-Chia; Lee-Hsieh, Jane

    2010-09-01

    With the growing trend of preparing students for lifelong learning, the theory of self-directed learning (SDL) has been increasingly applied in the context of higher education. In order to foster lifelong learning, abilities among nursing students, faculties need to have an appropriate instrument to measure the SDL abilities of nursing students. The objectives of this study were to develop an instrument to measure the SDL abilities of nursing students and to test the validity and reliability of this instrument. This study was conducted in 4 phases. In Phase 1, based on a review of the literature, the researchers developed an instrument to measure SDL. In Phase 2, two rounds of the Delphi study were conducted, to determine the content validity of the instrument. In Phase 3, a convenience sample of 1072 nursing students from two representative schools across three different types of nursing programs were recruited to test the construct validity of the Self-Directed Learning Instrument (SDLI). Finally, in Phase 4, the internal consistency and reliability of the instrument were tested. The resulting SDLI consists of 20 items across the following four domains: learning motivation, planning and implementing, self-monitoring, and interpersonal, communication. The final model in confirmatory factor analysis revealed that this 20-item SDLI indicated a good fit of the model. The value of Cronbach's alpha for the total scale was .916 and for the four domains were .801, .861, .785, and .765, respectively. The SDLI is a valid and reliable instrument for identifying student SDL abilities. It is available to students in nursing and similar medical programs to evaluate their own SDL. This scale may also enable nursing faculty to assess students' SDL status, design better lesson plans and curricula, and, implement appropriate teaching strategies for nursing students in order to foster the growth of lifelong learning abilities. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  7. Update of GRASP/Ada reverse engineering tools for Ada

    NASA Technical Reports Server (NTRS)

    Cross, James H., II

    1993-01-01

    The GRASP/Ada project (Graphical Representations of Algorithms, Structures, and Processes for Ada) successfully created and prototyped a new algorithmic level graphical representation for Ada software, the Control Structure Diagram (CSD). The primary impetus for creation of the CSD was to improve the comprehension efficiency of Ada software and, as a result, improve reliability and reduce costs. The emphasis was on the automatic generation of the CSD from Ada PDL or source code to support reverse engineering and maintenance. The CSD has the potential to replace traditional pretty printed Ada source code. In Phase 1 of the GRASP/Ada project, the CSD graphical constructs were created and applied manually to several small Ada programs. A prototype CSD generator (Version 1) was designed and implemented using FLEX and BISON running under VMS on a VAX 11-780. In Phase 2, the prototype was improved and ported to the Sun 4 platform under UNIX. A user interface was designed and partially implemented using the HP widget toolkit and the X Windows System. In Phase 3, the user interface was extensively reworked using the Athena widget toolkit and X Windows. The prototype was applied successfully to numerous Ada programs ranging in size from several hundred to several thousand lines of source code. Following Phase 3,e two update phases were completed. Update'92 focused on the initial analysis of evaluation data collected from software engineering students at Auburn University and the addition of significant enhancements to the user interface. Update'93 (the current update) focused on the statistical analysis of the data collected in the previous update and preparation of Version 3.4 of the prototype for limited distribution to facilitate further evaluation. The current prototype provides the capability for the user to generate CSD's from Ada PDL or source code in a reverse engineering as well as forward engineering mode with a level of flexibility suitable for practical application. An overview of the GRASP/Ada project with an emphasis on the current update is provided.

  8. Effects of bridge construction on songbirds and small mammals at Blennerhassett Island, Ohio River, USA.

    PubMed

    Vance, Joshua A; Angus, Norse B; Anderson, James T

    2013-09-01

    Construction of man-made objects such as roads and bridges may have impacts on wildlife depending on species or location. We investigated songbirds and small mammals along the Ohio River, WV, USA at a new bridge both before and after construction and at a bridge crossing that was present throughout the study. Comparisons were made at each site over three time periods (1985-1987 [Phase I] and 1998-2000 [Phase II] [pre-construction], 2007-2009 [Phase III] [post-construction]) and at three distances (0, 100, 300 m) from the bridge or proposed bridge location. Overall, 70 songbirds and 10 small mammals were detected during the study. Cliff swallows (Petrochelidon pyrrhonota) and rock pigeons (Columba livia) showed high affinity for bridges (P < 0.05). Combined small mammal abundances increased between Phases I and II (P < 0.05), but did not differ between Phases II and III (P > 0.05). Species richness and diversity for songbirds and small mammals did not differ before and after bridge construction (P > 0.05). We found that most species sampled did not respond to the bridge crossing, and believe that the bridge is not causing any measurable negative density impacts to the species we investigated. The new bridge does provide habitat for exotic rock pigeons that are adjusted to man-made structures for nesting.

  9. Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry.

    PubMed

    Tam, Vivian W Y; Tam, Leona; Le, Khoa N

    2010-02-01

    Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that "increasing overall business competitiveness and strategic business opportunities" was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while "rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations" was considered as the major benefit from Australian respondents. However, "lack of clients' support", "increase in management cost" and "increase in documentation workload, such as working documents, procedures and tools" were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, "inclusion of concrete recycling evaluation in tender appraisal" and "defining clear legal evaluation of concrete recycling" were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.

  10. [Construction of an educational technology for teaching about nursing on peripheral venipuncture].

    PubMed

    Frota, Natasha Marques; Barros, Lívia Moreira; de Araújo, Thiago Moura; Caldini, Luana Nunes; do Nascimento, Jennara Cândido; Caetano, Joselany Afio

    2013-06-01

    The aim of the study was to describe the construction of a course on peripheral venipuncture using the Information and Communication Technologies. This is a methodological research, developed at the Federal University of Ceara from January to March 2012. The construction phases are: the analysis, design and development according to the theoretical framework of Galvis-Panqueva. In the analysis, objectives, content target audience, the study environment and technology infrastructure were delimited. During the design phase the environment interface and navigation structure of the course were evaluated. The development consisted in the materialization of all that was designed in the previous phase Once all three phases of construction of the course were conducted it was available in the Virtual Learning Environment SOLAR. The finalproduct of the course is presented as support of nursing students and consequently the training of future nurses in their care practice on peripheral venipuncture.

  11. Development of Environmental Load Estimation Model for Road Drainage Systems in the Early Design Phase

    NASA Astrophysics Data System (ADS)

    Park, Jin-Young; Lee, Dong-Eun; Kim, Byung-Soo

    2017-10-01

    Due to the increasing concern about climate change, efforts to reduce environmental load are continuously being made in construction industry, and LCA (life cycle assessment) is being presented as an effective method to assess environmental load. Since LCA requires information on construction quantity used for environmental load estimation, however, it is not being utilized in the environmental review in the early design phase where it is difficult to obtain such information. In this study, computation system for construction quantity based on standard cross section of road drainage facilities was developed to compute construction quantity required for LCA using only information available in the early design phase to develop and verify the effectiveness of a model that can perform environmental load estimation. The result showed that it is an effective model that can be used in the early design phase as it revealed a 13.39% mean absolute error rate.

  12. Improving Orientation Outcomes: Implementation of Phased Orientation Process in an Intermediate Special Care Nursery.

    PubMed

    Rivera, Emily K; Shedenhelm, Heidi J; Gibbs, Ardyce L

    2015-01-01

    In response to changing needs of registered nurse orientees, the staff education committee in the Intermediate Special Care Nursery has implemented a phased orientation process. This phased process includes a mentoring experience postorientation to support a new nurse through the first year of employment. Since implementing the phased orientation process in the Intermediate Special Care Nursery, orientee satisfaction and preparation to practice have increased, and length of orientation has decreased.

  13. Process improvement in cardiac surgery: development and implementation of a reoperation for bleeding checklist.

    PubMed

    Loor, Gabriel; Vivacqua, Alessandro; Sabik, Joseph F; Li, Liang; Hixson, Eric D; Blackstone, Eugene H; Koch, Colleen G

    2013-11-01

    High-performing health care organizations differentiate themselves by focusing on continuous process improvement initiatives aimed at enhancing patient outcomes. Reoperation for bleeding is an event associated with considerable morbidity risk. Hence, our primary objective was to develop and implement a formal operative checklist to reduce technical reasons for postoperative bleeding. From January 1, 2011, through June 30, 2012, 5812 cardiac surgical procedures were performed at Cleveland Clinic (Cleveland, OH). A multidisciplinary team developed a simple, easy-to-perform hemostasis checklist based on the most common sites of bleeding. An extensive educational in-service was performed before limited, then universal, checklist implementation. Geometric charts were used to track the number of cases between consecutive reoperations for bleeding. We compared these before (phase 0) and after the first limited implementation phase (phase 1) and the universal implementation phase (phase 2) of the checklist. The average number of cases between consecutive reoperations for bleeding increased from 32 in phase 0 to 53 in both phase 1 (P = .002) and phase 2 (P = .01). A substantial reduction in reoperation for bleeding cases followed implementation of a formalized hemostasis checklist. Our findings underscore the important influence of memory aids that focus attention on surgical techniques to improve patient outcomes in a complex, operative work environment. Copyright © 2013 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  14. A model-based 3D phase unwrapping algorithm using Gegenbauer polynomials.

    PubMed

    Langley, Jason; Zhao, Qun

    2009-09-07

    The application of a two-dimensional (2D) phase unwrapping algorithm to a three-dimensional (3D) phase map may result in an unwrapped phase map that is discontinuous in the direction normal to the unwrapped plane. This work investigates the problem of phase unwrapping for 3D phase maps. The phase map is modeled as a product of three one-dimensional Gegenbauer polynomials. The orthogonality of Gegenbauer polynomials and their derivatives on the interval [-1, 1] are exploited to calculate the expansion coefficients. The algorithm was implemented using two well-known Gegenbauer polynomials: Chebyshev polynomials of the first kind and Legendre polynomials. Both implementations of the phase unwrapping algorithm were tested on 3D datasets acquired from a magnetic resonance imaging (MRI) scanner. The first dataset was acquired from a homogeneous spherical phantom. The second dataset was acquired using the same spherical phantom but magnetic field inhomogeneities were introduced by an external coil placed adjacent to the phantom, which provided an additional burden to the phase unwrapping algorithm. Then Gaussian noise was added to generate a low signal-to-noise ratio dataset. The third dataset was acquired from the brain of a human volunteer. The results showed that Chebyshev implementation and the Legendre implementation of the phase unwrapping algorithm give similar results on the 3D datasets. Both implementations of the phase unwrapping algorithm compare well to PRELUDE 3D, 3D phase unwrapping software well recognized for functional MRI.

  15. Wellness-Promoting Practices Through Girl Scouts: A Pragmatic Superiority Randomized Controlled Trial With Additional Dissemination.

    PubMed

    Cull, Brooke J; Dzewaltowski, David A; Guagliano, Justin M; Rosenkranz, Sara K; Knutson, Cassandra K; Rosenkranz, Richard R

    2018-01-01

    To evaluate the effectiveness of in-person versus online Girl Scout leader wellness training for implementation of wellness-promoting practices during troop meetings (phase I) and to assess training adoption and current practices across the council (phase II). Pragmatic superiority trial (phase 1) followed by serial cross-sectional study (phase II). Girl Scout troop meetings in Northeast Kansas. Eighteen troop leaders from 3 counties (phase 1); 113 troop leaders from 7 counties (phase II). Phase I: Troop leaders attended 2 wellness training sessions (first in groups, second individually), wherein leaders set wellness-promoting practice implementation goals, self-monitored progress, and received guidance and resources for implementation. Leaders received the intervention in person or online. Phase I: At baseline and postintervention, leaders completed a wellness-promoting practice implementation questionnaire assessing practices during troop meetings (max score = 11). Phase II: Leaders completed a survey about typical troop practices and interest in further training. Phase I: Generalized linear mixed modeling. Phase I: In-person training increased wellness-promoting practice implementation more than online training (in person = 2.1 ± 1.8; online = 0.2 ± 1.2; P = .022). Phase II: Fifty-six percent of leaders adopted the training. For 8 of 11 wellness categories, greater than 50% of leaders employed wellness-promoting practices. In-person training was superior to online training for improvements in wellness-promoting practices. Wellness training was adopted by the majority of leaders across the council.

  16. Composite particle theory of three-dimensional gapped fermionic phases: Fractional topological insulators and charge-loop excitation symmetry

    NASA Astrophysics Data System (ADS)

    Ye, Peng; Hughes, Taylor L.; Maciejko, Joseph; Fradkin, Eduardo

    2016-09-01

    Topological phases of matter are usually realized in deconfined phases of gauge theories. In this context, confined phases with strongly fluctuating gauge fields seem to be irrelevant to the physics of topological phases. For example, the low-energy theory of the two-dimensional (2D) toric code model (i.e., the deconfined phase of Z2 gauge theory) is a U(1 )×U(1 ) Chern-Simons theory in which gauge charges (i.e., e and m particles) are deconfined and the gauge fields are gapped, while the confined phase is topologically trivial. In this paper, we point out a route to constructing exotic three-dimensional (3D) gapped fermionic phases in a confining phase of a gauge theory. Starting from a parton construction with strongly fluctuating compact U(1 )×U(1 ) gauge fields, we construct gapped phases of interacting fermions by condensing two linearly independent bosonic composite particles consisting of partons and U(1 )×U(1 ) magnetic monopoles. This can be regarded as a 3D generalization of the 2D Bais-Slingerland condensation mechanism. Charge fractionalization results from a Debye-Hückel-type screening cloud formed by the condensed composite particles. Within our general framework, we explore two aspects of symmetry-enriched 3D Abelian topological phases. First, we construct a new fermionic state of matter with time-reversal symmetry and Θ ≠π , the fractional topological insulator. Second, we generalize the notion of anyonic symmetry of 2D Abelian topological phases to the charge-loop excitation symmetry (Charles ) of 3D Abelian topological phases. We show that line twist defects, which realize Charles transformations, exhibit non-Abelian fusion properties.

  17. Cu-Zn binary phase diagram and diffusion couples

    NASA Technical Reports Server (NTRS)

    Mccoy, Robert A.

    1992-01-01

    The objectives of this paper are to learn: (1) what information a binary phase diagram can yield; (2) how to construct and heat treat a simple diffusion couple; (3) how to prepare a metallographic sample; (4) how to operate a metallograph; (5) how to correlate phases found in the diffusion couple with phases predicted by the phase diagram; (6) how diffusion couples held at various temperatures could be used to construct a phase diagram; (7) the relation between the thickness of an intermetallic phase layer and the diffusion time; and (8) the effect of one species of atoms diffusing faster than another species in a diffusion couple.

  18. Streamline Your Project: A Lifecycle Model.

    ERIC Educational Resources Information Center

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  19. Accounting for Errors in Low Coverage High-Throughput Sequencing Data When Constructing Genetic Maps Using Biparental Outcrossed Populations

    PubMed Central

    Bilton, Timothy P.; Schofield, Matthew R.; Black, Michael A.; Chagné, David; Wilcox, Phillip L.; Dodds, Ken G.

    2018-01-01

    Next-generation sequencing is an efficient method that allows for substantially more markers than previous technologies, providing opportunities for building high-density genetic linkage maps, which facilitate the development of nonmodel species’ genomic assemblies and the investigation of their genes. However, constructing genetic maps using data generated via high-throughput sequencing technology (e.g., genotyping-by-sequencing) is complicated by the presence of sequencing errors and genotyping errors resulting from missing parental alleles due to low sequencing depth. If unaccounted for, these errors lead to inflated genetic maps. In addition, map construction in many species is performed using full-sibling family populations derived from the outcrossing of two individuals, where unknown parental phase and varying segregation types further complicate construction. We present a new methodology for modeling low coverage sequencing data in the construction of genetic linkage maps using full-sibling populations of diploid species, implemented in a package called GUSMap. Our model is based on the Lander–Green hidden Markov model but extended to account for errors present in sequencing data. We were able to obtain accurate estimates of the recombination fractions and overall map distance using GUSMap, while most existing mapping packages produced inflated genetic maps in the presence of errors. Our results demonstrate the feasibility of using low coverage sequencing data to produce genetic maps without requiring extensive filtering of potentially erroneous genotypes, provided that the associated errors are correctly accounted for in the model. PMID:29487138

  20. Accounting for Errors in Low Coverage High-Throughput Sequencing Data When Constructing Genetic Maps Using Biparental Outcrossed Populations.

    PubMed

    Bilton, Timothy P; Schofield, Matthew R; Black, Michael A; Chagné, David; Wilcox, Phillip L; Dodds, Ken G

    2018-05-01

    Next-generation sequencing is an efficient method that allows for substantially more markers than previous technologies, providing opportunities for building high-density genetic linkage maps, which facilitate the development of nonmodel species' genomic assemblies and the investigation of their genes. However, constructing genetic maps using data generated via high-throughput sequencing technology ( e.g. , genotyping-by-sequencing) is complicated by the presence of sequencing errors and genotyping errors resulting from missing parental alleles due to low sequencing depth. If unaccounted for, these errors lead to inflated genetic maps. In addition, map construction in many species is performed using full-sibling family populations derived from the outcrossing of two individuals, where unknown parental phase and varying segregation types further complicate construction. We present a new methodology for modeling low coverage sequencing data in the construction of genetic linkage maps using full-sibling populations of diploid species, implemented in a package called GUSMap. Our model is based on the Lander-Green hidden Markov model but extended to account for errors present in sequencing data. We were able to obtain accurate estimates of the recombination fractions and overall map distance using GUSMap, while most existing mapping packages produced inflated genetic maps in the presence of errors. Our results demonstrate the feasibility of using low coverage sequencing data to produce genetic maps without requiring extensive filtering of potentially erroneous genotypes, provided that the associated errors are correctly accounted for in the model. Copyright © 2018 Bilton et al.

  1. MARMOT Phase-Field Model for the U-Si System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aagesen, Larry Kenneth; Schwen, Daniel

    2016-09-01

    A phase-field model for the U-Si system has been implemented in MARMOT. The free energies for the phases relevant to accident-tolerant fuel applications (U 3Si 2, USi, U 3Si, and liquid) were implemented as free energy materials within MARMOT. A new three-phase phase-field model based on the concepts of the Kim-Kim-Suzuki two-phase model was developed and implemented in the MOOSE phase-field module. Key features of this model are that two-phase interfaces are stable with respect to formation of the third phase, and that arbitrary phase free energies can be used. The model was validated using a simplified three-phase system andmore » the U-Si system. In the U-Si system, the model correctly reproduced three-phase coexistence in a U 3Si 2-liquid-USi system at the eutectic temperature, solidification of a three-phase mixture below the eutectic temperature, and complete melting of a three-phase mixture above the eutectic temperature.« less

  2. Green noise wall construction and evaluation.

    DOT National Transportation Integrated Search

    2011-09-01

    This report details the research performed under Phase I of a research study titled Green Noise Wall Construction and Evaluation that looks into the feasibility of using green noise barriers as a noise mitigation option in Ohio. This phase incl...

  3. Implementation of a Proficiency-Based Diploma System in Maine: Phase II--District Level Analysis

    ERIC Educational Resources Information Center

    Silvernail, David L.; Stump, Erika K.; McCafferty, Anita Stewart; Hawes, Kathryn M.

    2014-01-01

    This report describes the findings from Phase II of a study of Maine's implementation of a proficiency-based diploma system. At the request of the Joint Standing Committee on Education and Cultural Affairs of the Maine Legislature, the Maine Policy Research Institute (MEPRI) has conducted a two-phased study of the implementation of Maine law…

  4. Technique for Reduction of Environmental Pollution from Construction Wastes

    NASA Astrophysics Data System (ADS)

    Bakaeva, N. V.; Klimenko, M. Y.

    2017-11-01

    The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).

  5. In-situ resource utilization in the design of advanced lunar facilities

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Resource utilization will play an important role in the establishment and support of a permanently manned lunar base. At the University of Houston - College of Architecture and the Sasakawa International Center for Space Architecture, a study team recently investigated the potential use of lunar in-situ materials in the design of lunar facilities. The team identified seven potential lunar construction materials; concrete, sulfur concrete, cast basalt, sintered basalt, glass, fiberglass, and metals. Analysis and evaluation of these materials with respect to their physical properties, processes, energy requirements, resource efficiency, and overall advantages and disadvantages lead to the selection of basalt materials as the more likely construction material for initial use on a lunar base. Basalt materials can be formed out of in-situ lunar regolith, with minor material beneficiation, by a simple process of heating and controlled cooling. The team then conceptualized a construction system that combines lunar regolith sintering and casting to make pressurized structures out of lunar resources. The design uses a machine that simultaneously excavates and sinters the lunar regolith to create a cylindrical hole, which is then enclosed with cast basalt slabs, allowing the volume to be pressurized for use as a living or work environment. Cylinder depths of up to 4 to 6 m in the lunar mare or 10 to 12 m in the lunar highlands are possible. Advantages of this construction system include maximum resource utilization, relatively large habitable volumes, interior flexibility, and minimal construction equipment needs. Conclusions of this study indicate that there is significant potential for the use of basalt, a lunar resource derived construction material, as a low cost alternative to Earth-based materials. It remains to be determined when in lunar base phasing this construction method should be implemented.

  6. The ToxCast Chemical Landscape - Paving the Road to 21st ...

    EPA Pesticide Factsheets

    The ToxCast high-throughput screening (HTS) program within the U.S. Environmental Protection Agency (EPA) was launched in 2007. Phase I of the program screened 310 chemicals, mostly pesticides, across hundreds of ToxCast assay endpoints. In Phase II, the ToxCast library was expanded to 1878 chemicals, culminating in public release of screening data at the end of 2013. Concurrently, a larger EPA library of 3726 chemicals (including the Phase II chemicals) was undergoing screening in the cross-federal agency Tox21 HTS project. Four years later, Phase III of EPA’s ToxCast program is actively screening a diverse library consisting of more than 3800 chemicals, 96% of which are also undergoing Tox21 screening. The majority of ToxCast studies, to date, have focused on using HTS results to build biologically based models for predicting in vivo toxicity endpoints. The focus of the present article, in contrast, is on the EPA chemical library underpinning these efforts. A history of the phased construction of EPA’s ToxCast library is presented, considering factors influencing chemical selection as well as the various quality measures implemented. Next, Chemical Abstracts Service Registry Numbers (CASRN), which were used to compile initial chemical nominations for ToxCast testing, are used to assess overlaps of the current ToxCast library with important toxicity, regulatory, and exposure inventories. Lastly, ToxCast chemicals are described in terms of generaliz

  7. Detailed analysis of an optimized FPP-based 3D imaging system

    NASA Astrophysics Data System (ADS)

    Tran, Dat; Thai, Anh; Duong, Kiet; Nguyen, Thanh; Nehmetallah, Georges

    2016-05-01

    In this paper, we present detail analysis and a step-by-step implementation of an optimized fringe projection profilometry (FPP) based 3D shape measurement system. First, we propose a multi-frequency and multi-phase shifting sinusoidal fringe pattern reconstruction approach to increase accuracy and sensitivity of the system. Second, phase error compensation caused by the nonlinear transfer function of the projector and camera is performed through polynomial approximation. Third, phase unwrapping is performed using spatial and temporal techniques and the tradeoff between processing speed and high accuracy is discussed in details. Fourth, generalized camera and system calibration are developed for phase to real world coordinate transformation. The calibration coefficients are estimated accurately using a reference plane and several gauge blocks with precisely known heights and by employing a nonlinear least square fitting method. Fifth, a texture will be attached to the height profile by registering a 2D real photo to the 3D height map. The last step is to perform 3D image fusion and registration using an iterative closest point (ICP) algorithm for a full field of view reconstruction. The system is experimentally constructed using compact, portable, and low cost off-the-shelf components. A MATLAB® based GUI is developed to control and synchronize the whole system.

  8. Self-bending elastic waves and obstacle circumventing in wireless power transfer

    NASA Astrophysics Data System (ADS)

    Tol, S.; Xia, Y.; Ruzzene, M.; Erturk, A.

    2017-04-01

    We demonstrate self-bending of elastic waves along convex trajectories by means of geometric and phased arrays. Potential applications include ultrasonic imaging and manipulation, wave focusing, and wireless power transfer around obstacles. The basic concept is illustrated through a geometric array, which is designed to implement a phase delay profile among the array elements that leads to self-bending along a specified circular trajectory. Experimental validation is conducted for the lowest asymmetric Lamb wave mode in a thin plate over a range of frequencies to investigate the bandwidth of the approach. Experiments also illustrate the functionality of the array as a transmitter to deliver elastic wave energy to a receiver/harvester located behind a large obstacle for electrical power extraction. It is shown that the trajectory is not distorted by the presence of the obstacle and circumventing is achieved. A linear phased array counterpart of the geometric array is then constructed to illustrate the concept by imposing proper time delays to the array elements, which allows the generation of different trajectories using the same line source. This capability is demonstrated by tailoring the path diameter in the phased array setting, which offers the flexibility and versatility to induce a variety of convex trajectories for self-bending elastic waves.

  9. Real-Time Optical Monitoring of Flow Kinetics and Gas Phase Reactions Under High-Pressure OMCVD Conditions

    NASA Technical Reports Server (NTRS)

    Dietz, N.; McCall, S.; Bachmann, K. J.

    2001-01-01

    This contribution addresses the real-time optical characterization of gas flow and gas phase reactions as they play a crucial role for chemical vapor phase depositions utilizing elevated and high pressure chemical vapor deposition (HPCVD) conditions. The objectives of these experiments are to validate on the basis of results on real-time optical diagnostics process models simulation codes, and provide input parameter sets needed for analysis and control of chemical vapor deposition at elevated pressures. Access to microgravity is required to retain high pressure conditions of laminar flow, which is essential for successful acquisition and interpretation of the optical data. In this contribution, we describe the design and construction of the HPCVD system, which include access ports for various optical methods of real-time process monitoring and to analyze the initial stages of heteroepitaxy and steady-state growth in the different pressure ranges. To analyze the onset of turbulence, provisions are made for implementation of experimental methods for in-situ characterization of the nature of flow. This knowledge will be the basis for the design definition of experiments under microgravity, where gas flow conditions, gas phase and surface chemistry, might be analyzed by remote controlled real-time diagnostics tools, developed in this research project.

  10. Guaranteeing Isochronous Control of Networked Motion Control Systems Using Phase Offset Adjustment

    PubMed Central

    Kim, Ikhwan; Kim, Taehyoun

    2015-01-01

    Guaranteeing isochronous transfer of control commands is an essential function for networked motion control systems. The adoption of real-time Ethernet (RTE) technologies may be profitable in guaranteeing deterministic transfer of control messages. However, unpredictable behavior of software in the motion controller often results in unexpectedly large deviation in control message transmission intervals, and thus leads to imprecise motion. This paper presents a simple and efficient heuristic to guarantee the end-to-end isochronous control with very small jitter. The key idea of our approach is to adjust the phase offset of control message transmission time in the motion controller by investigating the behavior of motion control task. In realizing the idea, we performed a pre-runtime analysis to determine a safe and reliable phase offset and applied the phase offset to the runtime code of motion controller by customizing an open-source based integrated development environment (IDE). We also constructed an EtherCAT-based motion control system testbed and performed extensive experiments on the testbed to verify the effectiveness of our approach. The experimental results show that our heuristic is highly effective even for low-end embedded controller implemented in open-source software components under various configurations of control period and the number of motor drives. PMID:26076407

  11. Using a detailed inventory of a large wastewater treatment plant to estimate the relative importance of construction to the overall environmental impacts.

    PubMed

    Morera, Serni; Corominas, Lluís; Rigola, Miquel; Poch, Manel; Comas, Joaquim

    2017-10-01

    The aim of this work is to quantify the relative contribution to the overall environmental impact of the construction phase compared to the operational phase for a large conventional activated sludge wastewater treatment plant (WWTP). To estimate these environmental impacts, a systematic procedure was designed to obtain the detailed Life Cycle Inventories (LCI) for civil works and equipment, taking as starting point the construction project budget and the list of equipment installed at the Girona WWTP, which are the most reliable information sources of materials and resources used during the construction phase. A detailed inventory is conducted by including 45 materials for civil works and 1,240 devices for the equipment. For most of the impact categories and different life spans of the WWTP, the contribution of the construction phase to the overall burden is higher than 5% and, especially for metal depletion, the impact of construction reaches 63%. When comparing to the WWTP inventories available in Ecoinvent the share of construction obtained in this work is about 3 times smaller for climate change and twice higher for metal depletion. Concrete and reinforcing steel are the materials with the highest contribution to the civil works phase and motors, pumps and mobile and transport equipment are also key equipment to consider during life cycle inventories of WWTPs. Additional robust inventories for similar WWTP can leverage this work by applying the factors (kg of materials and energy per m 3 of treated water) and guidance provided. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. ALICE detector in construction phase

    NASA Astrophysics Data System (ADS)

    Peryt, Wiktor S.

    2005-09-01

    ALICE1 collaboration, which prepares one of the biggest physics experiments in the history, came into production phase of its detector. The experiment will start at LHC2 at CERN in 2007/2008. In the meantime about 1000 people from ~70 institutions are involved in this enterprise. ALICE detector consists of many sub-detectors, designed and manufactured in many laboratories and commercial firms, located mainly in Europe, but also in U.S., India, China and Korea. To assure appropriate working environment for such a specific task, strictly related to tests of particular components, measurements and assembly procedures Detector Construction Database system has been designed and implemented at CERN and at some labs involved in these activities. In this paper special attention is paid to this topic not only due to fact of innovative approach to the problem. Another reason is the group of young computer scientists (mainly students) from the Warsaw University of Technology, leaded by the author, has designed and developed the system for the whole experiment3. Another very interesting subject is the Data Acquisition System which has to fulfill very hard requirements concerning speed and high bandwidth. Required technical performance is achieved thanks to using PCI bus (usually in previous high energy physics experiments VME standard has been used) and optical links. Very general overview of the whole detector and physics goals of ALICE experiment will also be given.

  13. The IDEAS**2 computing environment

    NASA Technical Reports Server (NTRS)

    Racheli, Ugo

    1990-01-01

    This document presents block diagrams of the IDEAS**2 computing environment. IDEAS**2 is the computing environment selected for system engineering (design and analysis) by the Center for Space Construction (CSC) at the University of Colorado (UCB). It is intended to support integration and analysis of any engineering system and at any level of development, from Pre-Phase A conceptual studies to fully mature Phase C/D projects. The University of Colorado (through the Center for Space Construction) has joined the Structural Dynamics Research Corporation (SDRC) University Consortium which makes available unlimited software licenses for instructional purposes. In addition to providing the backbone for the implementation of the IDEAS**2 computing environment, I-DEAS can be used as a stand-alone product for undergraduate CAD/CAE instruction. Presently, SDRC is in the process of releasing I-DEAS level 5.0 which represents a substantial improvement in both the user interface and graphic processing capabilities. IDEAS**2 will be immediately useful for a number of current programs within CSC (such as DYCAM and the 'interruptability problem'). In the future, the following expansions of the basic IDEAS**2 program will be pursued, consistent with the overall objectives of the Center and of the College: upgrade I-DEAS and IDEAS**2 to level 5.0; create new analytical programs for applications not limited to orbital platforms; research the semantic organization of engineering databases; and create an 'interoperability' testbed.

  14. Controllable phase transitions and novel selection rules in Josephson junctions with inherent orthogonality

    NASA Astrophysics Data System (ADS)

    Cheng, Qiang; Zhang, Kunhua; Ma, Hongyang

    2018-03-01

    We propose a new type of Josephson junction consisting of topologically nontrivial superconductors with inherent orthogonality and a ferromagnetic interface. It is found this type of junction can host rich ground states: 0 phase, π phase, 0 + π phase, φ0 phase and φ0 ± φ phase. Phase transitions can be controlled by changing the direction of the interfacial magnetization. Phase diagrams are presented in the orientation space. Novel selection rules for the lowest order current, sin ⁡ ϕ or cos ⁡ ϕ, of this kind of junction are derived. General conditions for the formation of various ground states are established, which possess guiding significance to the experimental design of required ground states for practical applications. We construct the succinct form of a Ginzburg-Landau type of free energy from the viewpoint of the interplay between topological superconductivity and ferromagnetism, which can immediately lead to the selection rules. The constructed terms are universally available to the topological Josephson junctions with or without inherent orthogonality reported recently. The spin supercurrent, its selection rules and their relations to the constructed energy are also investigated.

  15. Mechanisation and automation technologies development in work at construction sites

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  16. Toward optimal implementation of cancer prevention and control programs in public health: a study protocol on mis-implementation.

    PubMed

    Padek, Margaret; Allen, Peg; Erwin, Paul C; Franco, Melissa; Hammond, Ross A; Heuberger, Benjamin; Kasman, Matt; Luke, Doug A; Mazzucca, Stephanie; Moreland-Russell, Sarah; Brownson, Ross C

    2018-03-23

    Much of the cancer burden in the USA is preventable, through application of existing knowledge. State-level funders and public health practitioners are in ideal positions to affect programs and policies related to cancer control. Mis-implementation refers to ending effective programs and policies prematurely or continuing ineffective ones. Greater attention to mis-implementation should lead to use of effective interventions and more efficient expenditure of resources, which in the long term, will lead to more positive cancer outcomes. This is a three-phase study that takes a comprehensive approach, leading to the elucidation of tactics for addressing mis-implementation. Phase 1: We assess the extent to which mis-implementation is occurring among state cancer control programs in public health. This initial phase will involve a survey of 800 practitioners representing all states. The programs represented will span the full continuum of cancer control, from primary prevention to survivorship. Phase 2: Using data from phase 1 to identify organizations in which mis-implementation is particularly high or low, the team will conduct eight comparative case studies to get a richer understanding of mis-implementation and to understand contextual differences. These case studies will highlight lessons learned about mis-implementation and identify hypothesized drivers. Phase 3: Agent-based modeling will be used to identify dynamic interactions between individual capacity, organizational capacity, use of evidence, funding, and external factors driving mis-implementation. The team will then translate and disseminate findings from phases 1 to 3 to practitioners and practice-related stakeholders to support the reduction of mis-implementation. This study is innovative and significant because it will (1) be the first to refine and further develop reliable and valid measures of mis-implementation of public health programs; (2) bring together a strong, transdisciplinary team with significant expertise in practice-based research; (3) use agent-based modeling to address cancer control implementation; and (4) use a participatory, evidence-based, stakeholder-driven approach that will identify key leverage points for addressing mis-implementation among state public health programs. This research is expected to provide replicable computational simulation models that can identify leverage points and public health system dynamics to reduce mis-implementation in cancer control and may be of interest to other health areas.

  17. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...

  18. Calibration and implementation of miniature electronic cone penetrometers for road and highway design and construction control : final report.

    DOT National Transportation Integrated Search

    1997-12-01

    A prototype miniature electronic cone penetrometer system is developed for road and highway design and construction control. The equipment is implemented in front of the Research Vehicle for Geotechnical In Situ testing and Support (REVEGITS). A cali...

  19. Community-Wide Zero Energy Ready Home Standard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herk, A.; Beggs, T.

    This report outlines the steps a developer can use when looking to create and implement higher performance standards such as the U.S. Department of Energy (DOE) Zero Energy Ready Home (ZERH) standards in a community. The report also describes the specific examples of how this process was followed by a developer, Forest City, in the Stapleton community in Denver, Colorado. IBACOS described the steps used to begin to bring the DOE ZERH standard to the Forest City Stapleton community based on 15 years of community-scale development work done by IBACOS. As a result of this prior IBACOS work, the teammore » gained an understanding of the various components that a master developer needs to consider and created strategies for incorporating those components in the initial phases of development to achieve higher performance buildings in the community. An automated scoring system can be used to perform an internal audit that provides a detailed and consistent evaluation of how several homes under construction or builders' floor plans compare with the requirements of the DOE Zero Energy Ready Home program. This audit can be performed multiple times at specific milestones during construction to allow the builder to make changes as needed throughout construction for the project to meet Zero Energy Ready Home standards. This scoring system also can be used to analyze a builder's current construction practices and design.« less

  20. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention

    PubMed Central

    Zoellner, Jamie M.; Porter, Kathleen J.; Chen, Yvonnes; Hedrick, Valisa E.; You, Wen; Hickman, Maja; Estabrooks, Paul A.

    2017-01-01

    Objective Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Design Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Main Outcome Measures Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. Results TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13–20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6–38%) and behaviour (average 30%, range 6–55%) were significant. Conclusion Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases. PMID:28165771

  1. A framework and a measurement instrument for sustainability of work practices in long-term care

    PubMed Central

    2011-01-01

    Background In health care, many organizations are working on quality improvement and/or innovation of their care practices. Although the effectiveness of improvement processes has been studied extensively, little attention has been given to sustainability of the changed work practices after implementation. The objective of this study is to develop a theoretical framework and measurement instrument for sustainability. To this end sustainability is conceptualized with two dimensions: routinization and institutionalization. Methods The exploratory methodological design consisted of three phases: a) framework development; b) instrument development; and c) field testing in former improvement teams in a quality improvement program for health care (N teams = 63, N individual = 112). Data were collected not until at least one year had passed after implementation. Underlying constructs and their interrelations were explored using Structural Equation Modeling and Principal Component Analyses. Internal consistency was computed with Cronbach's alpha coefficient. A long and a short version of the instrument are proposed. Results The χ2- difference test of the -2 Log Likelihood estimates demonstrated that the hierarchical two factor model with routinization and institutionalization as separate constructs showed a better fit than the one factor model (p < .01). Secondly, construct validity of the instrument was strong as indicated by the high factor loadings of the items. Finally, the internal consistency of the subscales was good. Conclusions The theoretical framework offers a valuable starting point for the analysis of sustainability on the level of actual changed work practices. Even though the two dimensions routinization and institutionalization are related, they are clearly distinguishable and each has distinct value in the discussion of sustainability. Finally, the subscales conformed to psychometric properties defined in literature. The instrument can be used in the evaluation of improvement projects. PMID:22087884

  2. Freezing Transition Studies Through Constrained Cell Model Simulation

    NASA Astrophysics Data System (ADS)

    Nayhouse, Michael; Kwon, Joseph Sang-Il; Heng, Vincent R.; Amlani, Ankur M.; Orkoulas, G.

    2014-10-01

    In the present work, a simulation method based on cell models is used to deduce the fluid-solid transition of a system of particles that interact via a pair potential, , which is of the form with . The simulations are implemented under constant-pressure conditions on a generalized version of the constrained cell model. The constrained cell model is constructed by dividing the volume into Wigner-Seitz cells and confining each particle in a single cell. This model is a special case of a more general cell model which is formed by introducing an additional field variable that controls the number of particles per cell and, thus, the relative stability of the solid against the fluid phase. High field values force configurations with one particle per cell and thus favor the solid phase. Fluid-solid coexistence on the isotherm that corresponds to a reduced temperature of 2 is determined from constant-pressure simulations of the generalized cell model using tempering and histogram reweighting techniques. The entire fluid-solid phase boundary is determined through a thermodynamic integration technique based on histogram reweighting, using the previous coexistence point as a reference point. The vapor-liquid phase diagram is obtained from constant-pressure simulations of the unconstrained system using tempering and histogram reweighting. The phase diagram of the system is found to contain a stable critical point and a triple point. The phase diagram of the corresponding constrained cell model is also found to contain both a stable critical point and a triple point.

  3. Asymmetric color image encryption based on singular value decomposition

    NASA Astrophysics Data System (ADS)

    Yao, Lili; Yuan, Caojin; Qiang, Junjie; Feng, Shaotong; Nie, Shouping

    2017-02-01

    A novel asymmetric color image encryption approach by using singular value decomposition (SVD) is proposed. The original color image is encrypted into a ciphertext shown as an indexed image by using the proposed method. The red, green and blue components of the color image are subsequently encoded into a complex function which is then separated into U, S and V parts by SVD. The data matrix of the ciphertext is obtained by multiplying orthogonal matrices U and V while implementing phase-truncation. Diagonal entries of the three diagonal matrices of the SVD results are abstracted and scrambling combined to construct the colormap of the ciphertext. Thus, the encrypted indexed image covers less space than the original image. For decryption, the original color image cannot be recovered without private keys which are obtained from phase-truncation and the orthogonality of V. Computer simulations are presented to evaluate the performance of the proposed algorithm. We also analyze the security of the proposed system.

  4. Galaxy Formation from the Primordial Black Holes

    NASA Astrophysics Data System (ADS)

    Morikawa, Masahiro

    2017-12-01

    Supermassive black hole (SMBH) of size MBH = 106-10M⊙ is common in the Universe and it defines the center of the galaxy. A galaxy and the SMBH are generally thought to have co-evolved. However, the SMBH cannot evolve so fast as commonly observed even at redshift z > 6. Therefore, we explore a natural hypothesis that the SMBH has been already formed mature at z ⪆ 10 before stars and galaxies. The SMBH forms energetic jets and out-flows which trigger massive star formation in the ambient gas. They eventually construct globular clusters and classical bulge as well as the body of elliptical galaxies. We propose simple models which implement these processes. We point out that the globular clusters and classical bulges have a common origin but are in different phases. The same is true for the elliptical and spiral galaxies. Physics behind these phase division is the runaway star formation process with strong feedback to SMBH. This is similar to the forest-fire model that displays self-organized criticality.

  5. Synthesis of Conformal Phased Antenna Arrays With A Novel Multiobjective Invasive Weed Optimization Algorithm

    NASA Astrophysics Data System (ADS)

    Li, Wen Tao; Hei, Yong Qiang; Shi, Xiao Wei

    2018-04-01

    By virtue of the excellent aerodynamic performances, conformal phased arrays have been attracting considerable attention. However, for the synthesis of patterns with low/ultra-low sidelobes of the conventional conformal arrays, the obtained dynamic range ratios of amplitude excitations could be quite high, which results in stringent requirements on various error tolerances for practical implementation. Time-modulated array (TMA) has the advantages of low sidelobe and reduced dynamic range ratio requirement of amplitude excitations. This paper takes full advantages of conformal antenna arrays and time-modulated arrays. The active-element-pattern, including element mutual coupling and platform effects, is employed in the whole design process. To optimize the pulse durations and the switch-on instants of the time-modulated elements, multiobjective invasive weed optimization (MOIWO) algorithm based on the nondominated sorting of the solutions is proposed. A S-band 8-element cylindrical conformal array is designed and a S-band 16-element cylindrical-parabolic conformal array is constructed and tested at two different steering angles.

  6. Scalable, efficient ASICS for the square kilometre array: From A/D conversion to central correlation

    NASA Astrophysics Data System (ADS)

    Schmatz, M. L.; Jongerius, R.; Dittmann, G.; Anghel, A.; Engbersen, T.; van Lunteren, J.; Buchmann, P.

    2014-05-01

    The Square Kilometre Array (SKA) is a future radio telescope, currently being designed by the worldwide radio-astronomy community. During the first of two construction phases, more than 250,000 antennas will be deployed, clustered in aperture-array stations. The antennas will generate 2.5 Pb/s of data, which needs to be processed in real time. For the processing stages from A/D conversion to central correlation, we propose an ASIC solution using only three chip architectures. The architecture is scalable - additional chips support additional antennas or beams - and versatile - it can relocate its receiver band within a range of a few MHz up to 4GHz. This flexibility makes it applicable to both SKA phases 1 and 2. The proposed chips implement an antenna and station processor for 289 antennas with a power consumption on the order of 600W and a correlator, including corner turn, for 911 stations on the order of 90 kW.

  7. Polarization-independent broadband meta-holograms via polarization-dependent nanoholes.

    PubMed

    Zhang, Xiaohu; Li, Xiong; Jin, Jinjin; Pu, Mingbo; Ma, Xiaoliang; Luo, Jun; Guo, Yinghui; Wang, Changtao; Luo, Xiangang

    2018-05-17

    Composed of ultrathin metal or dielectric nanostructures, metasurfaces can manipulate the phase, amplitude and polarization of electromagnetic waves at a subwavelength scale, which is promising for flat optical devices. In general, metasurfaces composed of space-variant anisotropic units are sensitive to the incident polarization due to the inherent polarization dependent geometric phase. Here, we implement polarization-independent broadband metasurface holograms constructed by polarization-dependent anisotropic elliptical nanoholes by elaborate design of complex amplitude holograms. The fabricated meta-hologram exhibits a polarization insensitive feature with an acceptable image quality. We verify the feasibility of the design algorithm for three-dimensional (3D) meta-holograms with simulation and the feasibility for two-dimensional (2D) meta-holograms is experimentally demonstrated at a broadband wavelength range from 405 nm to 632.8 nm. The effective polarization-independent broadband complex wavefront control with anisotropic elliptical nanoholes proposed in this paper greatly promotes the practical applications of the metasurface in technologies associated with wavefront manipulation, such as flat lens, colorful holographic displays and optical storage.

  8. Agile science: creating useful products for behavior change in the real world.

    PubMed

    Hekler, Eric B; Klasnja, Predrag; Riley, William T; Buman, Matthew P; Huberty, Jennifer; Rivera, Daniel E; Martin, Cesar A

    2016-06-01

    Evidence-based practice is important for behavioral interventions but there is debate on how best to support real-world behavior change. The purpose of this paper is to define products and a preliminary process for efficiently and adaptively creating and curating a knowledge base for behavior change for real-world implementation. We look to evidence-based practice suggestions and draw parallels to software development. We argue to target three products: (1) the smallest, meaningful, self-contained, and repurposable behavior change modules of an intervention; (2) "computational models" that define the interaction between modules, individuals, and context; and (3) "personalization" algorithms, which are decision rules for intervention adaptation. The "agile science" process includes a generation phase whereby contender operational definitions and constructs of the three products are created and assessed for feasibility and an evaluation phase, whereby effect size estimates/casual inferences are created. The process emphasizes early-and-often sharing. If correct, agile science could enable a more robust knowledge base for behavior change.

  9. Modelling, teachers' views on the nature of modelling, and implications for the education of modellers

    NASA Astrophysics Data System (ADS)

    Justi, Rosária S.; Gilbert, John K.

    2002-04-01

    In this paper, the role of modelling in the teaching and learning of science is reviewed. In order to represent what is entailed in modelling, a 'model of modelling' framework is proposed. Five phases in moving towards a full capability in modelling are established by a review of the literature: learning models; learning to use models; learning how to revise models; learning to reconstruct models; learning to construct models de novo. In order to identify the knowledge and skills that science teachers think are needed to produce a model successfully, a semi-structured interview study was conducted with 39 Brazilian serving science teachers: 10 teaching at the 'fundamental' level (6-14 years); 10 teaching at the 'medium'-level (15-17 years); 10 undergraduate pre-service 'medium'-level teachers; 9 university teachers of chemistry. Their responses are used to establish what is entailed in implementing the 'model of modelling' framework. The implications for students, teachers, and for teacher education, of moving through the five phases of capability, are discussed.

  10. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  11. A Vaporizing Liquid-Metal Anode for High-Power Hall Thrusters

    DTIC Science & Technology

    2007-06-14

    45 Figure 4-1. Dual-propellant anode cross section. Porous phase descriminator was constructed fro m stain less-steel...section. Porous phase descriminator was constructed from stainless-steel. The external bismuth reservoir is simply a welded stainless steel tube that

  12. Guidelines for Implementing State Skill Standards Certificate Program in Construction.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Workforce Development, Madison.

    This packet contains guidelines, a student competency checklist, and student evaluation sheet for use in a Wisconsin school-to-work state skill standards certificate program in construction. The guidelines provide a planning resource for implementing the program, which was created in partnership with unions, employers, the state Department of…

  13. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  14. [Determinants of occupational injuries in the construction of the "high speed train" Bologna-Florence].

    PubMed

    Pavone, Venere Leda Mara; Lisi, Catiuscia; Cinti, Danilo; Cervino, Daniela; Costantini, Adele Seniori; Forastiere, Francesco

    2007-01-01

    to study determinants of occupational injuries in tunnel construction using data from the surveillance system which had been implemented in order to monitor accidents during the construction of the "high speed train tracks in the Italian Regions Emilia-Romagna and Tuscany. retrospective cohort study. 16 sites for the construction of 14 tunnels of the high speed railway-tract Bologna-Firenze, in Italy. 1,602 workers (of 3,000 employed in the underground tunnelling), aged 18 - 67 years, operating during excavation with traditional method in 1999-2002. A total of 549 injuries occurred among 385 workers. The number of worked hours were used as time at risk. incidence rate ratios (IRR) and 95% confidence intervals for all injuries, serious injuries and first injuries were considered in separate multiple regression analyses (Poisson). residence, task and working phase were taken into consideration. An increased risk was found for younger workers, for carpenters (IRR "all-events" = 2.33; 95% CI=1.85-2.94; IRR" first-events" = 2.12; 95% CI 1.62-2.77) and miners (IRR "all-events" = 1.76; 95% CI 1.39-2.24; IRR"first-events" = 1.71; 95% CI 1.30-2.24) vs. machinery operators. Construction of inverted arch turns out to have an incidence rate ratio three times higher than digging out (IRR "all-events" = 2.79; 95% CI 2.27-3.43; IRR "firsts-event = 2.98; 95% CI 2.33-3.81). The probability of "serious" injuries (>30 days) is higher for miners (IRR=2.45; 95% CI 1.65-3.64) and for carpenters (IRR=2.31; 95% CI 1.53-3.49). this study pointed out to indicate some determinants (age, task and work phase) of injuries in tunneling about which little had been published previously. These results are useful for addressing preventive measures, for control and prevention activities and point to the need to explore the effect of experience and to study, through a case crossover design, transient working and individual risk factors for traumatic injury within these working sites.

  15. Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodruff, Dana L.; Judd, Chaeli; Thom, Ronald M.

    2010-01-01

    This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, includingmore » harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).« less

  16. The Attitude of Construction Workers toward the Implementation of Occupational Health and Safety (OHS)

    NASA Astrophysics Data System (ADS)

    Widaningsih, L.; Susanti, I.; Chandra, T.

    2018-02-01

    Construction industry refers to one of the industries dealing with high accident rate. Besides its outdoor workplace involving many workers who usually work manually, the workers’ work culture and less awareness of occupational health and safety (OHS) are attributed to the high accident rate. This study explores some construction workers who are involved in some construction projects in big cities such as Bandung and Jakarta. The questionnaire-given to the construction workers focusing on stone construction, wood construction, and finishing session-reveals that the construction workers knowledge and understanding of nine Occupational Health and Safety (OHS) aspects reach above 50%. However, does not appear to reflect their knowledge and understanding of Occupational Health and Safety (OHS). The results of Focus Group Discussion (FGD) and an in-depth interview show that the fallacious implementation of Occupational Health and Safety (OHS) is attributed to their traditional “work culture”.

  17. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  18. Evaluating Evidence-Based Practice Knowledge and Beliefs Through the e-Learning EBP Academy.

    PubMed

    Green, Angela; Jeffs, Debra A; Boateng, Beatrice A; Lowe, Gary R; Walden, Marlene

    2017-07-01

    This research examined evidence-based practice (EBP) knowledge and beliefs before and after a 3-month e-learning program was implemented to build EBP capacity at a large children's hospital. Ten clinicians completed the development, implementation, and evaluation of the e-learning education, comprising phase one. Revision and participation by 41 clinicians followed in phase two. Participants in both phases completed the EBP Beliefs and Implementation Scales preintervention, postintervention, and 6 months after postintervention. EBP beliefs and implementation increased immediately and 6 months after postintervention, with statistically significant increases in both phases. Participants in both phases applied knowledge by completing mentor-supported EBP projects. Although EBP beliefs and implementation scores increased and e-learning provided flexibility for clinician participation, challenges arose, resulting in lower-than-expected completion. Subsequent revisions resulted in hybrid education, integrating classroom and e-learning with project mentoring. This funded e-learning research contributes knowledge to the growing specialty of professional development. J Contin Educ Nurs. 2017;48(7):304-311. Copyright 2017, SLACK Incorporated.

  19. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred : because of construction loadings, which are an underemphasized : topic in many specifications and design : manuals. Bridge girders are least stable during the : construction phase, so it is impor...

  20. Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects

    NASA Astrophysics Data System (ADS)

    Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena

    2017-07-01

    Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.

  1. Wavelet transforms with discrete-time continuous-dilation wavelets

    NASA Astrophysics Data System (ADS)

    Zhao, Wei; Rao, Raghuveer M.

    1999-03-01

    Wavelet constructions and transforms have been confined principally to the continuous-time domain. Even the discrete wavelet transform implemented through multirate filter banks is based on continuous-time wavelet functions that provide orthogonal or biorthogonal decompositions. This paper provides a novel wavelet transform construction based on the definition of discrete-time wavelets that can undergo continuous parameter dilations. The result is a transformation that has the advantage of discrete-time or digital implementation while circumventing the problem of inadequate scaling resolution seen with conventional dyadic or M-channel constructions. Examples of constructing such wavelets are presented.

  2. Enhancing Efficiency of Safeguards at Facilities that are Shutdown or Closed-Down, including those being Decommissioned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moran, B.; Stern, W.; Colley, J.

    International Atomic Energy Agency (IAEA) safeguards involves verification activities at a wide range of facilities in a variety of operational phases (e.g., under construction, start-up, operating, shutdown, closed-down, and decommissioned). Safeguards optimization for each different facility type and operational phase is essential for the effectiveness of safeguards implementation. The IAEA’s current guidance regarding safeguards for the different facility types in the various lifecycle phases is provided in its Design Information Examination (DIE) and Verification (DIV) procedure. 1 Greater efficiency in safeguarding facilities that are shut down or closed down, including those being decommissioned, could allow the IAEA to use amore » greater portion of its effort to conduct other verification activities. Consequently, the National Nuclear Security Administration’s Office of International Nuclear Safeguards sponsored this study to evaluate whether there is an opportunity to optimize safeguards approaches for facilities that are shutdown or closed-down. The purpose of this paper is to examine existing safeguards approaches for shutdown and closed-down facilities, including facilities being decommissioned, and to seek to identify whether they may be optimized.« less

  3. Combinatorial invariants and covariants as tools for conical intersections.

    PubMed

    Ryb, Itai; Baer, Roi

    2004-12-01

    The combinatorial invariant and covariant are introduced as practical tools for analysis of conical intersections in molecules. The combinatorial invariant is a quantity depending on adiabatic electronic states taken at discrete nuclear configuration points. It is invariant to the phase choice (gauge) of these states. In the limit that the points trace a loop in nuclear configuration space, the value of the invariant approaches the corresponding Berry phase factor. The Berry phase indicates the presence of an odd or even number of conical intersections on surfaces bounded by these loops. Based on the combinatorial invariant, we develop a computationally simple and efficient method for locating conical intersections. The method is robust due to its use of gauge invariant nature. It does not rely on the landscape of intersecting potential energy surfaces nor does it require the computation of nonadiabatic couplings. We generalize the concept to open paths and combinatorial covariants for higher dimensions obtaining a technique for the construction of the gauge-covariant adiabatic-diabatic transformation matrix. This too does not make use of nonadiabatic couplings. The importance of using gauge-covariant expressions is underlined throughout. These techniques can be readily implemented by standard quantum chemistry codes. (c) 2004 American Institute of Physics.

  4. Intermediate Photovoltaic System Application Experiment. Oklahoma Center for Science and Arts. Phase II. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report presents the key results of the Phase II efforts for the Intermediate PV System Applications Experiment at the Oklahoma Center for Science and Arts (OCSA). This phase of the project involved fabrication, installation and integration of a nominal 140 kW flat panel PV system made up of large, square polycrystalline-silicon solar cell modules, each nominally 61 cm x 122 cm in size. The output of the PV modules, supplied by Solarex Corporation, was augmented, 1.35 to 1 at peak, by a row of glass reflectors, appropriately tilted northward. The PV system interfaces with the Oklahoma Gas and Electricmore » Utility at the OCSA main switchgear. Any excess power generated by the system is fed into the utility under a one to one buyback arrangement. Except for a shortfall in the system output, presently suspected to be due to the poor performance of the modules, no serious problems were encountered. Certain value engineering changes implemented during construction and early operational failure events associated with the power conditioning system are also described. The system is currently undergoing extended testing and evaluation.« less

  5. Sampling and Reconstruction of the Pupil and Electric Field for Phase Retrieval

    NASA Technical Reports Server (NTRS)

    Dean, Bruce; Smith, Jeffrey; Aronstein, David

    2012-01-01

    This technology is based on sampling considerations for a band-limited function, which has application to optical estimation generally, and to phase retrieval specifically. The analysis begins with the observation that the Fourier transform of an optical aperture function (pupil) can be implemented with minimal aliasing for Q values down to Q = 1. The sampling ratio, Q, is defined as the ratio of the sampling frequency to the band-limited cut-off frequency. The analytical results are given using a 1-d aperture function, and with the electric field defined by the band-limited sinc(x) function. Perfect reconstruction of the Fourier transform (electric field) is derived using the Whittaker-Shannon sampling theorem for 1

  6. A software platform for phase contrast x-ray breast imaging research.

    PubMed

    Bliznakova, K; Russo, P; Mettivier, G; Requardt, H; Popov, P; Bravin, A; Buliev, I

    2015-06-01

    To present and validate a computer-based simulation platform dedicated for phase contrast x-ray breast imaging research. The software platform, developed at the Technical University of Varna on the basis of a previously validated x-ray imaging software simulator, comprises modules for object creation and for x-ray image formation. These modules were updated to take into account the refractive index for phase contrast imaging as well as implementation of the Fresnel-Kirchhoff diffraction theory of the propagating x-ray waves. Projection images are generated in an in-line acquisition geometry. To test and validate the platform, several phantoms differing in their complexity were constructed and imaged at 25 keV and 60 keV at the beamline ID17 of the European Synchrotron Radiation Facility. The software platform was used to design computational phantoms that mimic those used in the experimental study and to generate x-ray images in absorption and phase contrast modes. The visual and quantitative results of the validation process showed an overall good correlation between simulated and experimental images and show the potential of this platform for research in phase contrast x-ray imaging of the breast. The application of the platform is demonstrated in a feasibility study for phase contrast images of complex inhomogeneous and anthropomorphic breast phantoms, compared to x-ray images generated in absorption mode. The improved visibility of mammographic structures suggests further investigation and optimisation of phase contrast x-ray breast imaging, especially when abnormalities are present. The software platform can be exploited also for educational purposes. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  8. Barriers and facilitators to the implementation of orthodontic mini implants in clinical practice: a systematic review.

    PubMed

    Meursinge Reynders, Reint; Ronchi, Laura; Ladu, Luisa; Di Girolamo, Nicola; de Lange, Jan; Roberts, Nia; Mickan, Sharon

    2016-09-23

    Numerous surveys have shown that orthodontic mini implants (OMIs) are underused in clinical practice. To investigate this implementation issue, we conducted a systematic review to (1) identify barriers and facilitators to the implementation of OMIs for all potential stakeholders and (2) quantify these implementation constructs, i.e., record their prevalence. We also recorded the prevalence of clinicians in the eligible studies that do not use OMIs. Methods were based on our published protocol. Broad-spectrum eligibility criteria were defined. A barrier was defined as any variable that impedes or obstructs the use of OMIs and a facilitator as any variable that eases and promotes their use. Over 30 databases including gray literature were searched until 15 January 2016. The Joanna Briggs Institute tool for studies reporting prevalence and incidence data was used to critically appraise the included studies. Outcomes were qualitatively synthesized, and meta-analyses were only conducted when pre-set criteria were fulfilled. Three reviewers conducted all research procedures independently. We also contacted authors of eligible studies to obtain additional information. Three surveys fulfilled the eligibility criteria. Seventeen implementation constructs were identified in these studies and were extracted from a total of 165 patients and 1391 clinicians. Eight of the 17 constructs were scored by more than 50 % of the pertinent stakeholders. Three of these constructs overlapped between studies. Contacting of authors clarified various uncertainties but was not always successful. Limitations of the eligible studies included (1) the small number of studies; (2) not defining the research questions, i.e., the primary outcomes; (3) the research design (surveys) of the studies and the exclusive use of closed-ended questions; (4) not consulting standards for identifying implementation constructs; (5) the lack of pilot testing; (6) high heterogeneity; (7) the risk of reporting bias; and (8) additional shortcomings. Meta-analyses were not possible because of these limitations. Two eligible studies found that respectively 56.3 % (952/1691) and 40.16 % (439/1093) of clinicians do not use OMIs. Notwithstanding the limitations of the eligible studies, their findings were important because (1) 17 implementation constructs were identified of which 8 were scored by more than 50 % of the stakeholders; (2) the various shortcomings showed how to improve on future implementation studies; and (3) the underuse of OMIs in the selected studies and in the literature demonstrated the need to identify, quantify, and address implementation constructs. Prioritizing of future research questions on OMIs with all pertinent stakeholders is an important first step and could redirect research studies on OMIs towards implementation issues. Patients, clinicians, researchers, policymakers, insurance companies, implant companies, and research sponsors will all be beneficiaries.

  9. Phase 2 design study of the electronic assembly for the HRUV spectrometer/polarimeter intended for the solar maximum mission. Implementation phase program plan, revision A

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The primary function of the implementation phase is to convert the ERA design of the design study phase into deliverable flight hardware. The development aspects of the experiment logic unit, the dual power converter, the junction box and the cables are considered.

  10. Arizona Road Weather Information System (RWIS) communications plan

    DOT National Transportation Integrated Search

    2003-04-01

    There have been two implementations of Roadway Weather Information Systems in Arizona, known as RWIS Phase 0 and Phase 1. Each Phase has met with limited success and has on-going issues that need to be addressed before new RWIS sites are implemented....

  11. Multi-Modal Traveler Information System - Gateway Phased Implementation Plan

    DOT National Transportation Integrated Search

    1997-11-25

    The purpose of this working paper is to provide the main concepts and elements that need to be addressed in the overall implementation of the Gateway, both the Initial Phase and the Ultimate Phase. This working paper addresses these concepts and elem...

  12. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    NASA Astrophysics Data System (ADS)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  13. Adherence to, and outcomes of, a galactomannan screening protocol in high-risk hematology patients.

    PubMed

    Harricharan, S; Biederman, K; Bombassaro, A M; Lazo-Langner, A; Elsayed, S; Fulford, A; Delport, J A; Xenocostas, A

    2018-04-01

    A twice-weekly galactomannan (gm) screening protocol was implemented in high-risk hematology inpatients. Study objectives were to determine adherence to the protocol, use of selected resources, and patient outcomes. This retrospective cohort study compared outcomes of interest before and after implementation of gm screening. Adults undergoing matched related allogeneic hematopoietic stem-cell transplantation or induction chemotherapy for acute leukemia were eligible. Patients could be enrolled more than once and were evaluated as episodes. Adherence to the gm protocol was assessed in post-implementation episodes. Use of broad-spectrum antifungals (bsafs), consultations (infectious diseases, respirology), and diagnostic procedures (computed tomography imaging, bronchoalveolar lavage) were compared between phases, as were the patient outcomes of all-cause mortality and clinical success (alive and not taking a bsaf). Of 182 episodes consecutively screened, 70 per phase were enrolled. Clinical characteristics and duration of assessment were similar for the phases. Full or partial adherence to the protocol was observed in 61 post-implementation episodes (87%), with full adherence in 40 episodes (57%). More episodes in the pre-implementation phase than in the post-implementation phase involved receipt of bsafs, consultations, and diagnostics (27% vs. 7%, p = 0.02; 46% vs. 26%, p = 0.014; and 46% vs. 31%, p = 0.083 respectively). Although mortality was similar in the two phases, clinical success at the final assessment was observed in fewer pre-implementation than post-implementation episodes (79% vs. 98%, p < 0.001). Implementation of a gm screening protocol was feasible and associated with significantly fewer episodes involving receipt of bsafs and consultations, and with significantly more episodes showing clinical success.

  14. Biomass power for rural development. Technical progress report, May 1, 1996--December 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Developing commercial energy crops for power generation by the year 2000 is the focus of the DOE/USDA sponsored Biomass Power for Rural Development project. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Facette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG). Phase-II of the project willmore » focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. There will be testing of the energy crop as part of the gasification trials expected to occur at BED`s McNeill power station and potentially at one of GPU`s facilities. Phase-III will represent full-scale commercialization of the energy crop and power generation on a sustainable basis. Willow has been selected as the energy crop of choice for many reasons. Willow is well suited to the climate of the Northeastern United States, and initial field trials have demonstrated that the yields required for the success of the project are obtainable. Like other energy crops, willow has rural development benefits and could serve to diversify local crop production, provide new sources of income for participating growers, and create new jobs. Willow could be used to put a large base of idle acreage back into crop production. Additionally, the willow coppicing system integrates well with current farm operations and utilizes agricultural practices that are already familiar to farmers.« less

  15. State sum constructions of spin-TFTs and string net constructions of fermionic phases of matter

    DOE PAGES

    Bhardwaj, Lakshya; Gaiotto, Davide; Kapustin, Anton

    2017-04-18

    It is possible to describe fermionic phases of matter and spin-topological field theories in 2+1d in terms of bosonic “shadow” theories, which are obtained from the original theory by “gauging fermionic parity”. Furthemore, the fermionic/spin theories are recovered from their shadow by a process of fermionic anyon condensation: gauging a one-form symmetry generated by quasi-particles with fermionic statistics. We apply the formalism to theories which admit gapped boundary conditions. We obtain Turaev-Viro-like and Levin-Wen-like constructions of fermionic phases of matter. Here, we describe the group structure of fermionic SPT phases protected by Z 2f × G. The quaternion group makesmore » a surprise appearance.« less

  16. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred because of construction loadings, which are an underemphasized topic in many specifications and design manuals. Bridge girders are least stable during the construction phase, so it is important for...

  17. Implementation of the Short-Term Assessment of Risk and Treatability over two phases.

    PubMed

    Kroppan, Erik; Nonstad, Kåre; Iversen, Runar Busch; Søndenaa, Erik

    2017-01-01

    Over the last decade, the Short-Term Assessment of Risk and Treatability (START) has provided a strong evidence base to predict a range of problem behaviors. The implementation of START and adaptation of the services to the use of START have so far been sparsely described in the literature. The purpose of this study was to describe the continuation and the interdisciplinarity of risk assessments through the two phases. Over a period of 10 years, the forensic mental health services at Brøset has implemented START in two phases: initially with implementing the instrument (2005-2009) and secondarily by customizing the instrument to everyday treatment and planning (since 2009). This implementation was based on data from 887 START assessments for 181 patients over a decade (2005-2015). The results showed that the number of START assessments has been stable throughout the past 10 years and the interval between the ratings has decreased significantly ( p <0.05). The involvement by diversity of professionals has increased significantly over the two implementation phases. This study also addressed the continuity and organization of the implementation process and presented an overview of how START has been widespread in the service through treatment. The results showed an increased multidisciplinary participation and a continuing rate of assessments as the implementation progressed from assessment to a combined assessment-treatment phase.

  18. Implementation of the Short-Term Assessment of Risk and Treatability over two phases

    PubMed Central

    Kroppan, Erik; Nonstad, Kåre; Iversen, Runar Busch; Søndenaa, Erik

    2017-01-01

    Background Over the last decade, the Short-Term Assessment of Risk and Treatability (START) has provided a strong evidence base to predict a range of problem behaviors. The implementation of START and adaptation of the services to the use of START have so far been sparsely described in the literature. The purpose of this study was to describe the continuation and the interdisciplinarity of risk assessments through the two phases. Methods Over a period of 10 years, the forensic mental health services at Brøset has implemented START in two phases: initially with implementing the instrument (2005–2009) and secondarily by customizing the instrument to everyday treatment and planning (since 2009). This implementation was based on data from 887 START assessments for 181 patients over a decade (2005–2015). Results The results showed that the number of START assessments has been stable throughout the past 10 years and the interval between the ratings has decreased significantly (p<0.05). The involvement by diversity of professionals has increased significantly over the two implementation phases. Conclusion This study also addressed the continuity and organization of the implementation process and presented an overview of how START has been widespread in the service through treatment. The results showed an increased multidisciplinary participation and a continuing rate of assessments as the implementation progressed from assessment to a combined assessment–treatment phase. PMID:28860799

  19. National Dam Inspection Program. Laurel Run Dam. NDI ID Number PA-00380. DER ID Number 35-6, Pennsylvania Gas and Water Company. Susquehanna River Basin, Laurel Run, Lackawanna County, Pennsylvania Phase I Inspection Report,

    DTIC Science & Technology

    1980-04-01

    Supply. g. Design and Construction History. Laurel Run Dam was constructed in 1594 by Martin Cawley, a contractor from Archbald. The construction was...1T6Ace joly PHASE I INSPECTION REPORT -4 NATIONAL DAM INSPECTION PROGRAM Lime LAUREL RUN DAM PENNSYLVANIA GAS AND WATER COMPANY RESERVOIR AREA

  20. Security during the Construction of New Nuclear Power Plants: Technical Basis for Access Authorization and Fitness-For-Duty Requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Branch, Kristi M.; Baker, Kathryn A.

    A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.

  1. 30. "CONSTRUCTION PHASING, STATION '50' AREA." Specifications No. ENG043535775, Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. "CONSTRUCTION PHASING, STATION '50' AREA." Specifications No. ENG-04-353-57-75, Drawing No. AF-4502-19, sheet 4 of 5, D.O. Series No. AF 1439/26. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296, Date: 10 NOV. 59. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  2. JPRS Report, Science and Technology: Europe, German Aerospace Industry Competitiveness.

    DTIC Science & Technology

    1991-05-31

    construction , in which the German aerospace industry is involved (Alpha Jet, Tornado, Jaeger 90), are not directly transferable, since they deal with...INTA 1,500 100 Japan NASDA 938 749 U.S. NASA 23,0003 7,653 1. Planned after completion of construction phase (cun mately 100) 2. Annual average...for five-year construction phase 3. Excluding contractors rently approxi- Source: DLR, DASA III.5 Fiscal Aspects, Subsidies Taxes and duties affect

  3. The Simultaneous Production Model; A Model for the Construction, Testing, Implementation and Revision of Educational Computer Simulation Environments.

    ERIC Educational Resources Information Center

    Zillesen, Pieter G. van Schaick

    This paper introduces a hardware and software independent model for producing educational computer simulation environments. The model, which is based on the results of 32 studies of educational computer simulations program production, implies that educational computer simulation environments are specified, constructed, tested, implemented, and…

  4. 10 CFR Appendix C to Subpart D of... - Classes of Actions that Normally Require EAs But Not Necessarily EISs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../construction/operation of energy system prototypes C13. Import/export natural gas, minor new construction... Marketing Administration system-wide vegetation management program. C6Implementation of a Power Marketing Administration system-wide erosion control program. C7Establishment and implementation of contracts, policies...

  5. 77 FR 18923 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...

  6. Constructive Alignment in Economics Teaching: A Reflection on Effective Implementation

    ERIC Educational Resources Information Center

    McCann, Michael

    2017-01-01

    The typical approach to student-centred learning in Economics has focused on innovation within the classroom, with little thought given to how this complements teaching and learning and, crucially, assessment. This paper reflects on the implementation of constructive alignment in a final year managerial economics course. It demonstrates how it is…

  7. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have fewer, less well-defined phases, but can still be characterized by phases representing general or...

  8. Conceptional Considerations to Energy Balance and Global Warming Potential of Soil Bioengineering Structures

    NASA Astrophysics Data System (ADS)

    von der Thannen, Magdalena; Paratscha, Roman; Smutny, Roman; Lampalzer, Thomas; Strauss, Alfred; Rauch, Hans Peter

    2016-04-01

    Nowadays there is a high demand on engineering solutions considering not only technical aspects but also ecological and aesthetic values. In this context soil bioengineering techniques are often used as standalone solutions or in combination with conventional engineering structures. It is a construction technique that uses biological components for hydraulic and civil engineering solutions. In general it pursues the same objectives as conventional civil engineering structures. Currently the used assessment methods for soil bioengineering structures are referencing technically, ecologically and socio-economically. In a modern engineering approach additionally, environmental impacts and potential added values should be considered. The research project E-Protect aims at developing Environmental Life Cycle Assessment (LCA) models for this special field of alpine protective constructions. Both, the Cumulative Energy Demand (CED) and the Global Warming Potential (GWP) should be considered in an Environmental LCA over the whole life cycle of an engineering structure. The life cycle itself can be divided into three phases: the construction phase, the use phase and the end of life phase. The paper represents a concept to apply an Environmental LCA model for soil bioengineering structures. Beside the construction phase of these structures particular attention will be given to the use phase. It is not only important in terms of engineering effects but also plays an important role for positive carbon footprint due to the growing plants of soil bioengineering structures in contrast to conventional structures. Innovative Environmental LCA models will be applied to soil bioengineering structures which provide a new transparency for the responsible planners and stakeholders, by pointing out the total consumption of resources in all construction phases and components.

  9. Attitudes and behaviour towards construction waste minimisation: a comparative analysis between China and the USA.

    PubMed

    Liu, Jingkuang; Gong, Enqin; Wang, Dong; Lai, XiaoHong; Zhu, Jian

    2018-05-21

    With the spread of the concept of sustainable development, people have gained awareness about the problem of massive illegal dumping of construction waste. In this research, a questionnaire survey was carried out in the USA and China. The results indicated the following. (1) Workers in both the countries had positive minimisation attitudes, and the attitude of Chinese construction workers was not significantly different from that of American construction workers. Furthermore, their average values were 3.9 and 4.07, respectively. (2) Business owners had a poor understanding of the obligations that should be fulfilled by contractors and construction workers, which greatly reduced (a) construction workers' and contractors' motivation to implement waste minimisation management and (b) the benefit-driven effect. (3) In terms of perceived behavioural control, Chinese construction workers had poorer minimisation technologies and knowledge than American construction workers, and it was very difficult for them to implement construction waste minimisation. The research conclusions and relevant suggestions may be used to improve the construction waste minimisation behaviour and awareness of Chinese people and promote China's construction waste minimisation management.

  10. Multiflavor string-net models

    NASA Astrophysics Data System (ADS)

    Lin, Chien-Hung

    2017-05-01

    We generalize the string-net construction to multiple flavors of strings, each of which is labeled by the elements of an Abelian group Gi. The same flavor of strings can branch, while different flavors of strings can cross one another and thus they form intersecting string nets. We systematically construct the exactly soluble lattice Hamiltonians and the ground-state wave functions for the intersecting string-net condensed phases. We analyze the braiding statistics of the low-energy quasiparticle excitations and find that our model can realize all the topological phases as the string-net model with group G =∏iGi . In this respect, our construction provides various ways of building lattice models which realize topological order G , corresponding to different partitions of G and thus different flavors of string nets. In fact, our construction concretely demonstrates the Künneth formula by constructing various lattice models with the same topological order. As an example, we construct the G =Z2×Z2×Z2 string-net model which realizes a non-Abelian topological phase by properly intersecting three copies of toric codes.

  11. Ready, Set, Change! Development and usability testing of an online readiness for change decision support tool for healthcare organizations.

    PubMed

    Timmings, Caitlyn; Khan, Sobia; Moore, Julia E; Marquez, Christine; Pyka, Kasha; Straus, Sharon E

    2016-02-24

    To address challenges related to selecting a valid, reliable, and appropriate readiness assessment measure in practice, we developed an online decision support tool to aid frontline implementers in healthcare settings in this process. The focus of this paper is to describe a multi-step, end-user driven approach to developing this tool for use during the planning stages of implementation. A multi-phase, end-user driven approach was used to develop and test the usability of a readiness decision support tool. First, readiness assessment measures that are valid, reliable, and appropriate for healthcare settings were identified from a systematic review. Second, a mapping exercise was performed to categorize individual items of included measures according to key readiness constructs from an existing framework. Third, a modified Delphi process was used to collect stakeholder ratings of the included measures on domains of feasibility, relevance, and likelihood to recommend. Fourth, two versions of a decision support tool prototype were developed and evaluated for usability. Nine valid and reliable readiness assessment measures were included in the decision support tool. The mapping exercise revealed that of the nine measures, most measures (78 %) focused on assessing readiness for change at the organizational versus the individual level, and that four measures (44 %) represented all constructs of organizational readiness. During the modified Delphi process, stakeholders rated most measures as feasible and relevant for use in practice, and reported that they would be likely to recommend use of most measures. Using data from the mapping exercise and stakeholder panel, an algorithm was developed to link users to a measure based on characteristics of their organizational setting and their readiness for change assessment priorities. Usability testing yielded recommendations that were used to refine the Ready, Set, Change! decision support tool . Ready, Set, Change! decision support tool is an implementation support that is designed to facilitate the routine incorporation of a readiness assessment as an early step in implementation. Use of this tool in practice may offer time and resource-saving implications for implementation.

  12. The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam

    NASA Astrophysics Data System (ADS)

    Tripoli; Mubarak; Nurisra; Mahmuddin

    2018-05-01

    This paper discusses the implementation of Indonesian National Standard (SNI) 7394: 2008 on procedures for calculating the unit price of concrete work for the construction of building and housing. The standard provides some reinforced concrete constructions unit price (UP) analysis by specified the total number of reinforcing uses. Related to reinforced concrete beam work (Analysis No. 6.31), the reinforcement requirement is stated at 200 kg/m3 of concrete. Once the implementation considers various earthquake zoning, the question will arise about the extent to which the standard is feasible to apply. Therefore, this research aimed to analyze the possibility of UP standard implementation by certain earthquake zonation. This research is focused on the construction of reinforced concrete beam for buildings with function as educational, residential and office buildings. The data used are sourced from 21 buildings in two zones in Aceh Province, covering Zone 10 and Zone 15 based on earthquake map of SNI 1726: 2012. The analysis results indicate that the UP standard for reinforced concrete beam cannot be applied to all zoning. The UP standard is only possible on buildings constructed in Zone 10 or zonation with seismic spectral response 0.6g to 0.7g or lower.

  13. The tug-of-war: fidelity versus adaptation throughout the health promotion program life cycle.

    PubMed

    Bopp, Melissa; Saunders, Ruth P; Lattimore, Diana

    2013-06-01

    Researchers across multiple fields have described the iterative and nonlinear phases of the translational research process from program development to dissemination. This process can be conceptualized within a "program life cycle" framework that includes overlapping and nonlinear phases: development, adoption, implementation, maintenance, sustainability or termination, and dissemination or diffusion, characterized by tensions between fidelity to the original plan and adaptation for the setting and population. In this article, we describe the life cycle (phases) for research-based health promotion programs, the key influences at each phase, and the issues related to the tug-of-war between fidelity and adaptation throughout the process using a fictionalized case study based on our previous research. This article suggests the importance of reconceptualizing intervention design, involving stakeholders, and monitoring fidelity and adaptation throughout all phases to maintain implementation fidelity and completeness. Intervention fidelity should be based on causal mechanisms to ensure effectiveness, while allowing for appropriate adaption to ensure maximum implementation and sustainability. Recommendations for future interventions include considering the determinants of implementation including contextual factors at each phase, the roles of stakeholders, and the importance of developing a rigorous, adaptive, and flexible definition of implementation fidelity and completeness.

  14. From Programs to Systems: Deploying Implementation Science and Practice for Sustained Real World Effectiveness in Services for Children and Families.

    PubMed

    Ghate, Deborah

    2016-01-01

    The transfer of knowledge of effective practice, especially into "usual care" settings, remains challenging. This article argues that to close this gap we need to recognize the particular challenges of whole-system improvement. We need to move beyond a limited focus on individual programs and experimental research on their effectiveness. The rapidly developing field of implementation science and practice (ISP) provides a particular lens and a set of important constructs that can helpfully accelerate progress. A review of selected key constructs and distinctive features of ISP, including recognizing invisible system infrastructure, co-construction involving active collaboration between stakeholders, and attention to active implementation, supports for providers beyond education and training. Key aspects of an implementation lens likely to be most helpful in sustaining effectiveness include assisting innovators to identify and accommodate the architecture of existing systems, understand the implementation process as a series of distinct but nonlinear stages, identify implementation outcomes as prerequisites for treatment outcomes, and analyse implementation challenges using frameworks of implementation drivers. In complex adaptive systems, how services are implemented may matter more than their specific content, and how services align and adapt to local context may determine their sustained usefulness. To improve implementation-relevant research, we need better process evaluation and cannot rely on experimental methods that do not capture complex systemic contexts. Deployment of an implementation lens may perhaps help to avoid future "rigor mortis," enabling more productively flexible and integrative approaches to both program design and evaluation.

  15. FPGA implementation of self organizing map with digital phase locked loops.

    PubMed

    Hikawa, Hiroomi

    2005-01-01

    The self-organizing map (SOM) has found applicability in a wide range of application areas. Recently new SOM hardware with phase modulated pulse signal and digital phase-locked loops (DPLLs) has been proposed (Hikawa, 2005). The system uses the DPLL as a computing element since the operation of the DPLL is very similar to that of SOM's computation. The system also uses square waveform phase to hold the value of the each input vector element. This paper discuss the hardware implementation of the DPLL SOM architecture. For effective hardware implementation, some components are redesigned to reduce the circuit size. The proposed SOM architecture is described in VHDL and implemented on field programmable gate array (FPGA). Its feasibility is verified by experiments. Results show that the proposed SOM implemented on the FPGA has a good quantization capability, and its circuit size very small.

  16. A Mars/phobos Transportation System

    NASA Technical Reports Server (NTRS)

    1989-01-01

    A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

  17. ECRH and W7-X: An intriguing pair

    NASA Astrophysics Data System (ADS)

    Erckmann, V.; Braune, H.; Gantenbein, G.; Jelonnek, J.; Kasparek, W.; Laqua, H. P.; Lechte, C.; Marushchenko, N. B.; Michel, G.; Plaum, B.; Thumm, M.; Weissgerber, M.; Wolf, R.; W7-X ECRH Teams

    2014-02-01

    The construction of the W7-X basic machine is almost completed and the device is approaching the commissioning phase. W7-X operation will be supported by ECRH working at 140 GHz in 2nd harmonic X- or O-mode with 10 MW cw power. Presently the activities at W7-X concentrate on the implementation of wall-armour, in-vessel components and diagnostics. The ECRH-system is in stand by with 5 out of 10 gyrotrons operational. The status of both, the W7-X device and the ECRH system is reported. Further R&D activities concentrate on extending the launching capability for sophisticated confinement investigations with remote steering launchers in a poloidal plane with weak magnetic field gradient.

  18. Phase Control in Nonlinear Systems

    NASA Astrophysics Data System (ADS)

    Zambrano, Samuel; Seoane, Jesús M.; Mariño, Inés P.; Sanjuán, Miguel A. F.; Meucci, Riccardo

    The following sections are included: * Introduction * Phase Control of Chaos * Description of the model * Numerical exploration of phase control of chaos * Experimental evidence of phase control of chaos * Phase Control of Intermittency in Dynamical Systems * Crisis-induced intermittency and its control * Experimental setup and implementation of the phase control scheme * Phase control of the laser in the pre-crisis regime * Phase control of the intermittency after the crisis * Phase control of the intermittency in the quadratic map * Phase Control of Escapes in Open Dynamical Systems * Control of open dynamical systems * Model description * Numerical simulations and heuristic arguments * Experimental implementation in an electronic circuit * Conclusions and Discussions * Acknowledgments * References

  19. Benefit Evaluation of Implementing BIM in Construction Projects

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  20. 622-Mbps Orthogonal Frequency Division Multiplexing (OFDM) Digital Modem Implemented

    NASA Technical Reports Server (NTRS)

    Kifle, Muli; Bizon, Thomas P.; Nguyen, Nam T.; Tran, Quang K.; Mortensen, Dale J.

    2002-01-01

    Future generation space communications systems feature significantly higher data rates and relatively smaller frequency spectrum allocations than systems currently deployed. This requires the application of bandwidth- and power-efficient signal transmission techniques. There are a number of approaches to implementing such techniques, including analog, digital, mixed-signal, single-channel, or multichannel systems. In general, the digital implementations offer more advantages; however, a fully digital implementation is very difficult because of the very high clock speeds required. Multichannel techniques are used to reduce the sampling rate. One such technique, multicarrier modulation, divides the data into a number of low-rate channels that are stacked in frequency. Orthogonal frequency division multiplexing (OFDM), a form of multicarrier modulation, is being proposed for numerous systems, including mobile wireless and digital subscriber link communication systems. In response to this challenge, NASA Glenn Research Center's Communication Technology Division has developed an OFDM digital modem (modulator and demodulator) with an aggregate information throughput of 622 Mbps. The basic OFDM waveform is constructed by dividing an incoming data stream into four channels, each using either 16- ary quadrature amplitude modulation (16-QAM) or 8-phase shift keying (8-PSK). An efficient implementation for an OFDM architecture is being achieved using the combination of a discrete Fourier transform (DFT) at the transmitter to digitally stack the individual carriers, inverse DFT at the receiver to perform the frequency translations, and a polyphase filter to facilitate the pulse shaping.

  1. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    DOT National Transportation Integrated Search

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  2. Constructing a High-Sensitivity, Computer-Interfaced, Differential Thermal Analysis Device for Teaching and Research

    ERIC Educational Resources Information Center

    Martinez, L. M.; Videa, M.; Mederos, F.; Mesquita, J.

    2007-01-01

    The construction of a new highly-sensitive, computer-interfaced, differential thermal analysis (DTA) device, used for gathering different information about the chemical reactions, is described. The instrument provides a better understanding about the phase transitions, phase diagrams and many more concepts to the students.

  3. Evaluation of the implementation of the Montreal At Home/Chez Soi project.

    PubMed

    Fleury, Marie-Josée; Grenier, Guy; Vallée, Catherine

    2014-11-28

    Homelessness and mental disorders constitute a major problem in Canada. The purpose of the At Home/Chez Soi pilot project was to house and provide supports to marginalised groups. Policymakers are in a better position to nurture new, complex interventions if they know which key factors hinder or enable their implementation. This paper evaluates the implementation process for the Montreal site of this project. We collected data from 62 individuals, through individual interviews, focus groups, questionnaires, observations and documentation. The implementation process was analysed using a conceptual framework with five constructs: Intervention Characteristics (IC), Context of Implementation (CI), Implementation Process (IP), Organizational Characteristics (OC) and Strategies of Implementation (SI). The most serious obstacle to the project came from the CI construct, i.e., lack of support from provincial authorities and key local resources in the homelessness field. The second was within the OC construct. The chief hindrances were numerous structures, divergent values among stakeholders, frequent turnover of personnel and team leaders; lacking staff supervision and miscommunication. The third is related to IC: the complex, unyielding nature of the project undermined its chances of success. The greatest challenges from IP were the pressure to perform, along with stress caused by planning, deadlines and tension between teams. Conversely, SI construct conditions (e.g., effective governing structures, comprehensive training initiatives and toolkits) were generally very positive even with problems in power sharing and local leadership. For the four other constructs, the following proved useful: evidence of the project's scope and quality, great needs of services consolidation, generous financing and status as a research pilot project, enthusiasm and commitment toward the project, substantially improved services, and overall user satisfaction. This study demonstrated the difficulty of implementing a complex project in the healthcare system. While the project faced many barriers, minimal conditions were also achieved. At the end of the study period, major tensions between organizations and teams were significantly reduced, supporting its full implementation. However, in late 2013, the project was unsustainable, calling into question the relevance of achieving a significant number of positive conditions in each area of the framework.

  4. Meausures of organizational characteristics associated with adoption and/or implementation of innovations: A systematic review.

    PubMed

    Allen, Jennifer D; Towne, Samuel D; Maxwell, Annette E; DiMartino, Lisa; Leyva, Bryan; Bowen, Deborah J; Linnan, Laura; Weiner, Bryan J

    2017-08-23

    This paper identifies and describes measures of constructs relevant to the adoption or implementation of innovations (i.e., new policies, programs or practices) at the organizational-level. This work is intended to advance the field of dissemination and implementation research by aiding scientists in the identification of existing measures and highlighting methodological issues that require additional attention. We searched for published studies (1973-2013) in 11 bibliographic databases for quantitative, empirical studies that presented outcome data related to adoption and/or implementation of an innovation. Included studies had to assess latent constructs related to the "inner setting" of the organization, as defined by the Consolidated Framework for Implementation Research. Of the 76 studies included, most (86%) were cross sectional and nearly half (49%) were conducted in health care settings. Nearly half (46%) involved implementation of evidence-based or "best practice" strategies; roughly a quarter (26%) examined use of new technologies. Primary outcomes most often assessed were innovation implementation (57%) and adoption (34%); while 4% of included studies assessed both outcomes. There was wide variability in conceptual and operational definitions of organizational constructs. The two most frequently assessed constructs included "organizational climate" and "readiness for implementation." More than half (55%) of the studies did not articulate an organizational theory or conceptual framework guiding the inquiry; about a third (34%) referenced Diffusion of Innovations theory. Overall, only 46% of articles reported psychometric properties of measures assessing latent organizational characteristics. Of these, 94% (33/35) described reliability and 71% (25/35) reported on validity. The lack of clarity associated with construct definitions, inconsistent use of theory, absence of standardized reporting criteria for implementation research, and the fact that few measures have demonstrated reliability or validity were among the limitations highlighted in our review. Given these findings, we recommend that increased attention be devoted toward the development or refinement of measures using common psychometric standards. In addition, there is a need for measure development and testing across diverse settings, among diverse population samples, and for a variety of types of innovations.

  5. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  6. Construction machine control guidance implementation strategy.

    DOT National Transportation Integrated Search

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  7. Implementation of new educational methods: how to overcome obstacles?

    PubMed

    Mimica, Mladen

    2010-03-01

    A presentation of new educational methods was organized for students and teachers of the Faculty of Medicine in Mostar in 2006. Afterwards, the teachers and the students were given a questionnaire to fill on their attitude towards actual, traditional versus new educational methods. According to the results of the questionnaire, a lot of students and the majority of teachers prefer status quo, and, moreover, only 1/3 of teachers support implementation of the new educational methods. Due to the results of this survey, implementation of new educational methods was postponed for the following two years. Since the management of the Faculty of Medicine in Mostar was well aware of the fact that new educational methods help in teaching students about fundamental principles of critical thinking, life-long learning and constructive intellectual conflicts, it was concluded that implementation of new methods should be a necessity. In this academic year (2008/2009), after discussion at the Faculty Council, a new course "Modern educational methods" has been introduced into the curriculum. As the first phase, a new transitional method named "Contradiction with Evidence Based Solution" has been introduced in the workshop session. The proposed new method is a combination of the old, traditional presentation done by a teacher, and new methods which are student-centred. Realistic expectation is that implementation of other new educational methods would be easier after introduction of this transitional method. This implementation trial should be seen as a pilot project that could be introduced to other faculties, at first to those of the University of Mostar, and afterwards to other universities in the region.

  8. Evaluation of phase-diversity techniques for solar-image restoration

    NASA Technical Reports Server (NTRS)

    Paxman, Richard G.; Seldin, John H.; Lofdahl, Mats G.; Scharmer, Goran B.; Keller, Christoph U.

    1995-01-01

    Phase-diversity techniques provide a novel observational method for overcomming the effects of turbulence and instrument-induced aberrations in ground-based astronomy. Two implementations of phase-diversity techniques that differ with regard to noise model, estimator, optimization algorithm, method of regularization, and treatment of edge effects are described. Reconstructions of solar granulation derived by applying these two implementations to common data sets are shown to yield nearly identical images. For both implementations, reconstructions from phase-diverse speckle data (involving multiple realizations of turbulence) are shown to be superior to those derived from conventional phase-diversity data (involving a single realization). Phase-diverse speckle reconstructions are shown to achieve near diffraction-limited resolution and are validated by internal and external consistency tests, including a comparison with a reconstruction using a well-accepted speckle-imaging method.

  9. Big Data is a powerful tool for environmental improvements in the construction business

    NASA Astrophysics Data System (ADS)

    Konikov, Aleksandr; Konikov, Gregory

    2017-10-01

    The work investigates the possibility of applying the Big Data method as a tool to implement environmental improvements in the construction business. The method is recognized as effective in analyzing big volumes of heterogeneous data. It is noted that all preconditions exist for this method to be successfully used for resolution of environmental issues in the construction business. It is proven that the principal Big Data techniques (cluster analysis, crowd sourcing, data mixing and integration) can be applied in the sphere in question. It is concluded that Big Data is a truly powerful tool to implement environmental improvements in the construction business.

  10. 28. "CONSTRUCTION PHASING, STATION '0' AREA." Specifications No. OC15775, Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. "CONSTRUCTION PHASING, STATION '0' AREA." Specifications No. OC1-57-75, Drawing No. AF-45-02-19, sheet 3 of 5, D.O. Series No. AF 1439/25, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/13/59. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  11. Development and Validation of a Fatigue Assessment Scale for U.S. Construction Workers

    PubMed Central

    Zhang, Mingzong; Sparer, Emily H.; Murphy, Lauren A.; Dennerlein, Jack T.; Fang, Dongping; Katz, Jeffrey N.; Caban-Martinez, Alberto J.

    2015-01-01

    Objective To develop a fatigue assessment scale and test its reliability and validity for commercial construction workers. Methods Using a two-phased approach, we first identified items for the development of a Fatigue Assessment Scale for Construction Workers (FASCW) through review of existing scales in the scientific literature, key informant interviews (n=11) and focus groups (3 groups with 6 workers each) with construction workers. The second phase included assessment for the reliability, validity and sensitivity of the new scale using a repeated-measures study design with a convenience sample of construction workers (n=144). Results Phase one resulted in a 16-item preliminary scale that after factor analysis yielded a final 10-item scale with two sub-scales (“Lethargy” and “Bodily Ailment”).. During phase two, the FASCW and its subscales demonstrated satisfactory internal consistency (alpha coefficients were FASCW (0.91), Lethargy (0.86) and Bodily Ailment (0.84)) and acceptable test-retest reliability (Pearson Correlations Coefficients: 0.59–0.68; Intraclass Correlation Coefficients: 0.74–0.80). Correlation analysis substantiated concurrent and convergent validity. A discriminant analysis demonstrated that the FASCW differentiated between groups with arthritis status and different work hours. Conclusions The 10-item FASCW with good reliability and validity is an effective tool for assessing the severity of fatigue among construction workers. PMID:25603944

  12. FluDetWeb: an interactive web-based system for the early detection of the onset of influenza epidemics.

    PubMed

    Conesa, David; López-Quílez, Antonio; Martínez-Beneito, Miguel Angel; Miralles, María Teresa; Verdejo, Francisco

    2009-07-29

    The early identification of influenza outbreaks has became a priority in public health practice. A large variety of statistical algorithms for the automated monitoring of influenza surveillance have been proposed, but most of them require not only a lot of computational effort but also operation of sometimes not-so-friendly software. In this paper, we introduce FluDetWeb, an implementation of a prospective influenza surveillance methodology based on a client-server architecture with a thin (web-based) client application design. Users can introduce and edit their own data consisting of a series of weekly influenza incidence rates. The system returns the probability of being in an epidemic phase (via e-mail if desired). When the probability is greater than 0.5, it also returns the probability of an increase in the incidence rate during the following week. The system also provides two complementary graphs. This system has been implemented using statistical free-software (R and WinBUGS), a web server environment for Java code (Tomcat) and a software module created by us (Rdp) responsible for managing internal tasks; the software package MySQL has been used to construct the database management system. The implementation is available on-line from: http://www.geeitema.org/meviepi/fludetweb/. The ease of use of FluDetWeb and its on-line availability can make it a valuable tool for public health practitioners who want to obtain information about the probability that their system is in an epidemic phase. Moreover, the architecture described can also be useful for developers of systems based on computationally intensive methods.

  13. FluDetWeb: an interactive web-based system for the early detection of the onset of influenza epidemics

    PubMed Central

    2009-01-01

    Background The early identification of influenza outbreaks has became a priority in public health practice. A large variety of statistical algorithms for the automated monitoring of influenza surveillance have been proposed, but most of them require not only a lot of computational effort but also operation of sometimes not-so-friendly software. Results In this paper, we introduce FluDetWeb, an implementation of a prospective influenza surveillance methodology based on a client-server architecture with a thin (web-based) client application design. Users can introduce and edit their own data consisting of a series of weekly influenza incidence rates. The system returns the probability of being in an epidemic phase (via e-mail if desired). When the probability is greater than 0.5, it also returns the probability of an increase in the incidence rate during the following week. The system also provides two complementary graphs. This system has been implemented using statistical free-software (ℝ and WinBUGS), a web server environment for Java code (Tomcat) and a software module created by us (Rdp) responsible for managing internal tasks; the software package MySQL has been used to construct the database management system. The implementation is available on-line from: http://www.geeitema.org/meviepi/fludetweb/. Conclusion The ease of use of FluDetWeb and its on-line availability can make it a valuable tool for public health practitioners who want to obtain information about the probability that their system is in an epidemic phase. Moreover, the architecture described can also be useful for developers of systems based on computationally intensive methods. PMID:19640304

  14. Assessing corporate project impacts in changeable contexts: A human rights perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch; University of Basel, P.O. Box, CH-4003 Basel; NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as anmore » umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact assessment. • Our methodology allows distinguishing corporate impacts from contextual changes. • Promptly observing context changes and impacts enables companies to react nimbly.« less

  15. Performance indicators in water and sanitation for developing areas.

    PubMed

    Pybus, P; Schoema, G

    2001-01-01

    There is a move throughout the developed world to introduce benchmarking techniques to the management of water and sanitation systems. The indicators that are being considered for benchmarking purposes tend to cover a broad band of activities that are part of the scope of management of large organisations. Most of the lists that have been prepared do not really cater for the implementation and operation of small rural schemes. The greatest need is the implementation of sustainable schemes for this category of consumer. The implementation of a rural water and sanitation scheme involves the negotiation in the initial stages with the local community representatives of what the community wants and how it will be provided and operated. This may have to be preceded by a period of empowerment so that the negotiations can be conducted by informed people. At the conclusion of the negotiations a business plan can be prepared that should be implemented in association with the community. The project is at this stage mainly in the control of a professional engineer, responsible for the technical interpretation of the business plan and the management of the construction phase. Finally, after commissioning, a water service provider will be responsible for the operation, management and maintenance of the scheme on a sustainable basis. The key actions and activities are identified and performance criteria defined. As communication at the beginning of the project is a critical component, the success of this is confirmed by examination and discussion as to how much has in fact been communicated and understood correctly. Other performance indicators for the operational phase are derived from the conventional ones used in the developed world. Finally, it is important that the participants, do not see the measurement of performance as a threatening situation, but rather a stepping stone to improvement of not only performance, but also of subsequent reward.

  16. Monitoring Environmental Performance Commitments in Construction Projects.

    DOT National Transportation Integrated Search

    2007-05-01

    EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....

  17. A stitch in time saves nine? A repeated cross-sectional case study on the implementation of the intersectoral community approach Youth At a Healthy Weight.

    PubMed

    van der Kleij, Rianne M J J; Crone, Mathilde R; Paulussen, Theo G W M; van de Gaar, Vivan M; Reis, Ria

    2015-10-08

    The implementation of programs complex in design, such as the intersectoral community approach Youth At a Healthy Weight (JOGG), often deviates from their application as intended. There is limited knowledge of their implementation processes, making it difficult to formulate sound implementation strategies. For two years, we performed a repeated cross-sectional case study on the implementation of a JOGG fruit and water campaign targeting children age 0-12. Semi-structured observations, interviews, field notes and professionals' logs entries were used to evaluate implementation process. Data was analyzed via a framework approach; within-case and cross-case displays were formulated and key determinants identified. Principles from Qualitative Comparative Analysis (QCA) were used to identify causal configurations of determinants per sector and implementation phase. Implementation completeness differed, but was highest in the educational and health care sector, and higher for key than additional activities. Determinants and causal configurations of determinants were mostly sector- and implementation phase specific. High campaign ownership and possibilities for campaign adaptation were most frequently mentioned as facilitators. A lack of reinforcement strategies, low priority for campaign use and incompatibility of own goals with campaign goals were most often indicated as barriers. We advise multiple 'stitches in time'; tailoring implementation strategies to specific implementation phases and sectors using both the results from this study and a mutual adaptation strategy in which professionals are involved in the development of implementation strategies. The results of this study show that the implementation process of IACOs is complex and sustainable implementation is difficult to achieve. Moreover, this study reveals that the implementation process is influenced by predominantly sector and implementation phase specific (causal configurations of) determinants.

  18. Measurement of a model of implementation for health care: toward a testable theory

    PubMed Central

    2012-01-01

    Background Greenhalgh et al. used a considerable evidence-base to develop a comprehensive model of implementation of innovations in healthcare organizations [1]. However, these authors did not fully operationalize their model, making it difficult to test formally. The present paper represents a first step in operationalizing Greenhalgh et al.’s model by providing background, rationale, working definitions, and measurement of key constructs. Methods A systematic review of the literature was conducted for key words representing 53 separate sub-constructs from six of the model’s broad constructs. Using an iterative process, we reviewed existing measures and utilized or adapted items. Where no one measure was deemed appropriate, we developed other items to measure the constructs through consensus. Results The review and iterative process of team consensus identified three types of data that can been used to operationalize the constructs in the model: survey items, interview questions, and administrative data. Specific examples of each of these are reported. Conclusion Despite limitations, the mixed-methods approach to measurement using the survey, interview measure, and administrative data can facilitate research on implementation by providing investigators with a measurement tool that captures most of the constructs identified by the Greenhalgh model. These measures are currently being used to collect data concerning the implementation of two evidence-based psychotherapies disseminated nationally within Department of Veterans Affairs. Testing of psychometric properties and subsequent refinement should enhance the utility of the measures. PMID:22759451

  19. Scaling up the 454 Titanium Library Construction and Pooling of Barcoded Libraries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phung, Wilson; Hack, Christopher; Shapiro, Harris

    2009-03-23

    We have been developing a high throughput 454 library construction process at the Joint Genome Institute to meet the needs of de novo sequencing a large number of microbial and eukaryote genomes, EST, and metagenome projects. We have been focusing efforts in three areas: (1) modifying the current process to allow the construction of 454 standard libraries on a 96-well format; (2) developing a robotic platform to perform the 454 library construction; and (3) designing molecular barcodes to allow pooling and sorting of many different samples. In the development of a high throughput process to scale up the number ofmore » libraries by adapting the process to a 96-well plate format, the key process change involves the replacement of gel electrophoresis for size selection with Solid Phase Reversible Immobilization (SPRI) beads. Although the standard deviation of the insert sizes increases, the overall quality sequence and distribution of the reads in the genome has not changed. The manual process of constructing 454 shotgun libraries on 96-well plates is a time-consuming, labor-intensive, and ergonomically hazardous process; we have been experimenting to program a BioMek robot to perform the library construction. This will not only enable library construction to be completed in a single day, but will also minimize any ergonomic risk. In addition, we have implemented a set of molecular barcodes (AKA Multiple Identifiers or MID) and a pooling process that allows us to sequence many targets simultaneously. Here we will present the testing of pooling a set of selected fosmids derived from the endomycorrhizal fungus Glomus intraradices. By combining the robotic library construction process and the use of molecular barcodes, it is now possible to sequence hundreds of fosmids that represent a minimal tiling path of this genome. Here we present the progress and the challenges of developing these scaled-up processes.« less

  20. Long-Term Information Management (LTIM) of Safeguards Data at Repositories: Phase II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haddal, Risa N.

    One of the challenges of implementing safeguards for geological repositories will be the long-term preservation of safeguards-related data for 100 years or more. While most countries considering the construction and operation of such facilities agree that safeguards information should be preserved, there are gaps with respect to standardized requirements, guidelines, timescales, and approaches. This study analyzes those gaps and explores research to clarify stakeholder needs, identify current policies, approaches, best practices and international standards, and explores existing safeguards information management infrastructure. The study also attempts to clarify what a safeguards data classification system might look like, how long data shouldmore » be retained, and how information should be exchanged between stakeholders at different phases of a repository’s life cycle. The analysis produced a variety of recommendations on what information to preserve, how to preserve it, where to store it, retention options and how to exchange information in the long term. Key findings include the use of the globally recognized international records management standard, ISO15489, for guidance on the development of information management systems, and the development of a Key Information File (KIF). The KIF could be used to identify only the most relevant, high-level safeguards information and the history of decision making about the repository. The study also suggests implementing on-site and off-site records storage in digital and physical form; developing a safeguards data classification system; long-term records retention with periodic reviews every 5 to 10 years during each phase of the repository life cycle; and establishing transition procedures well in advance so that data shepherds and records officers can transfer information with incoming facility managers effectively and efficiently. These and other recommendations are further analyzed in this study.« less

  1. Fiber optic reference frequency distribution to remote beam waveguide antennas

    NASA Technical Reports Server (NTRS)

    Calhoun, Malcolm; Kuhnle, Paul; Law, Julius

    1995-01-01

    In the NASA/JPL Deep Space Network (DSN), radio science experiments (probing outer planet atmospheres, rings, gravitational waves, etc.) and very long-base interferometry (VLBI) require ultra-stable, low phase noise reference frequency signals at the user locations. Typical locations for radio science/VLBI exciters and down-converters are the cone areas of the 34 m high efficiency antennas or the 70 m antennas, located several hundred meters from the reference frequency standards. Over the past three years, fiber optic distribution links have replaced coaxial cable distribution for reference frequencies to these antenna sites. Optical fibers are the preferred medium for distribution because of their low attenuation, immunity to EMI/IWI, and temperature stability. A new network of Beam Waveguide (BWG) antennas presently under construction in the DSN requires hydrogen maser stability at tens of kilometers distance from the frequency standards central location. The topic of this paper is the design and implementation of an optical fiber distribution link which provides ultra-stable reference frequencies to users at a remote BWG antenna. The temperature profile from the earth's surface to a depth of six feet over a time period of six months was used to optimize the placement of the fiber optic cables. In-situ evaluation of the fiber optic link performance indicates Allan deviation on the order of parts in 10(exp -15) at 1000 and 10,000 seconds averaging time; thus, the link stability degradation due to environmental conditions still preserves hydrogen maser stability at the user locations. This paper reports on the implementation of optical fibers and electro-optic devices for distributing very stable, low phase noise reference signals to remote BWG antenna locations. Allan deviation and phase noise test results for a 16 km fiber optic distribution link are presented in the paper.

  2. Fiber optic reference frequency distribution to remote beam waveguide antennas

    NASA Astrophysics Data System (ADS)

    Calhoun, Malcolm; Kuhnle, Paul; Law, Julius

    1995-05-01

    In the NASA/JPL Deep Space Network (DSN), radio science experiments (probing outer planet atmospheres, rings, gravitational waves, etc.) and very long-base interferometry (VLBI) require ultra-stable, low phase noise reference frequency signals at the user locations. Typical locations for radio science/VLBI exciters and down-converters are the cone areas of the 34 m high efficiency antennas or the 70 m antennas, located several hundred meters from the reference frequency standards. Over the past three years, fiber optic distribution links have replaced coaxial cable distribution for reference frequencies to these antenna sites. Optical fibers are the preferred medium for distribution because of their low attenuation, immunity to EMI/IWI, and temperature stability. A new network of Beam Waveguide (BWG) antennas presently under construction in the DSN requires hydrogen maser stability at tens of kilometers distance from the frequency standards central location. The topic of this paper is the design and implementation of an optical fiber distribution link which provides ultra-stable reference frequencies to users at a remote BWG antenna. The temperature profile from the earth's surface to a depth of six feet over a time period of six months was used to optimize the placement of the fiber optic cables. In-situ evaluation of the fiber optic link performance indicates Allan deviation on the order of parts in 10(exp -15) at 1000 and 10,000 seconds averaging time; thus, the link stability degradation due to environmental conditions still preserves hydrogen maser stability at the user locations. This paper reports on the implementation of optical fibers and electro-optic devices for distributing very stable, low phase noise reference signals to remote BWG antenna locations. Allan deviation and phase noise test results for a 16 km fiber optic distribution link are presented in the paper.

  3. Central State University: Phase III Report

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2013

    2013-01-01

    This document is the final report on Central State University's implementation of Section 371 of Ohio Amended Substitute House Bill 153. Implementation of Phase I action items required that deliverables and timelines be shifted to give Central State the best opportunity for early success. In Phase II, Central State responded aggressively to a…

  4. FastGCN: A GPU Accelerated Tool for Fast Gene Co-Expression Networks

    PubMed Central

    Liang, Meimei; Zhang, Futao; Jin, Gulei; Zhu, Jun

    2015-01-01

    Gene co-expression networks comprise one type of valuable biological networks. Many methods and tools have been published to construct gene co-expression networks; however, most of these tools and methods are inconvenient and time consuming for large datasets. We have developed a user-friendly, accelerated and optimized tool for constructing gene co-expression networks that can fully harness the parallel nature of GPU (Graphic Processing Unit) architectures. Genetic entropies were exploited to filter out genes with no or small expression changes in the raw data preprocessing step. Pearson correlation coefficients were then calculated. After that, we normalized these coefficients and employed the False Discovery Rate to control the multiple tests. At last, modules identification was conducted to construct the co-expression networks. All of these calculations were implemented on a GPU. We also compressed the coefficient matrix to save space. We compared the performance of the GPU implementation with those of multi-core CPU implementations with 16 CPU threads, single-thread C/C++ implementation and single-thread R implementation. Our results show that GPU implementation largely outperforms single-thread C/C++ implementation and single-thread R implementation, and GPU implementation outperforms multi-core CPU implementation when the number of genes increases. With the test dataset containing 16,000 genes and 590 individuals, we can achieve greater than 63 times the speed using a GPU implementation compared with a single-thread R implementation when 50 percent of genes were filtered out and about 80 times the speed when no genes were filtered out. PMID:25602758

  5. FastGCN: a GPU accelerated tool for fast gene co-expression networks.

    PubMed

    Liang, Meimei; Zhang, Futao; Jin, Gulei; Zhu, Jun

    2015-01-01

    Gene co-expression networks comprise one type of valuable biological networks. Many methods and tools have been published to construct gene co-expression networks; however, most of these tools and methods are inconvenient and time consuming for large datasets. We have developed a user-friendly, accelerated and optimized tool for constructing gene co-expression networks that can fully harness the parallel nature of GPU (Graphic Processing Unit) architectures. Genetic entropies were exploited to filter out genes with no or small expression changes in the raw data preprocessing step. Pearson correlation coefficients were then calculated. After that, we normalized these coefficients and employed the False Discovery Rate to control the multiple tests. At last, modules identification was conducted to construct the co-expression networks. All of these calculations were implemented on a GPU. We also compressed the coefficient matrix to save space. We compared the performance of the GPU implementation with those of multi-core CPU implementations with 16 CPU threads, single-thread C/C++ implementation and single-thread R implementation. Our results show that GPU implementation largely outperforms single-thread C/C++ implementation and single-thread R implementation, and GPU implementation outperforms multi-core CPU implementation when the number of genes increases. With the test dataset containing 16,000 genes and 590 individuals, we can achieve greater than 63 times the speed using a GPU implementation compared with a single-thread R implementation when 50 percent of genes were filtered out and about 80 times the speed when no genes were filtered out.

  6. Defining the external implementation context: an integrative systematic literature review.

    PubMed

    Watson, Dennis P; Adams, Erin L; Shue, Sarah; Coates, Heather; McGuire, Alan; Chesher, Jeremy; Jackson, Joanna; Omenka, Ogbonnaya I

    2018-03-27

    Proper implementation of evidence-based interventions is necessary for their full impact to be realized. However, the majority of research to date has overlooked facilitators and barriers existing outside the boundaries of the implementing organization(s). Better understanding and measurement of the external implementation context would be particularly beneficial in light of complex health interventions that extend into and interact with the larger environment they are embedded within. We conducted a integrative systematic literature review to identify external context constructs likely to impact implementation of complex evidence-based interventions. The review process was iterative due to our goal to inductively develop the identified constructs. Data collection occurred in four primary stages: (1) an initial set of key literature across disciplines was identified and used to inform (2) journal and (3) author searches that, in turn, informed the design of the final (4) database search. Additionally, (5) we conducted citation searches of relevant literature reviews identified in each stage. We carried out an inductive thematic content analysis with the goal of developing homogenous, well-defined, and mutually exclusive categories. We identified eight external context constructs: (1) professional influences, (2) political support, (3) social climate, (4) local infrastructure, (5) policy and legal climate, (6) relational climate, (7) target population, and (8) funding and economic climate. This is the first study to our knowledge to use a systematic review process to identify empirically observed external context factors documented to impact implementation. Comparison with four widely-utilized implementation frameworks supports the exhaustiveness of our review process. Future work should focus on the development of more stringent operationalization and measurement of these external constructs.

  7. Evaluating Protocol Lifecycle Time Intervals in HIV/AIDS Clinical Trials

    PubMed Central

    Schouten, Jeffrey T.; Dixon, Dennis; Varghese, Suresh; Cope, Marie T.; Marci, Joe; Kagan, Jonathan M.

    2014-01-01

    Background Identifying efficacious interventions for the prevention and treatment of human diseases depends on the efficient development and implementation of controlled clinical trials. Essential to reducing the time and burden of completing the clinical trial lifecycle is determining which aspects take the longest, delay other stages, and may lead to better resource utilization without diminishing scientific quality, safety, or the protection of human subjects. Purpose In this study we modeled time-to-event data to explore relationships between clinical trial protocol development and implementation times, as well as identify potential correlates of prolonged development and implementation. Methods We obtained time interval and participant accrual data from 111 interventional clinical trials initiated between 2006 and 2011 by NIH’s HIV/AIDS Clinical Trials Networks. We determined the time (in days) required to complete defined phases of clinical trial protocol development and implementation. Kaplan-Meier estimates were used to assess the rates at which protocols reached specified terminal events, stratified by study purpose (therapeutic, prevention) and phase group (pilot/phase I, phase II, and phase III/ IV). We also examined several potential correlates to prolonged development and implementation intervals. Results Even though phase grouping did not determine development or implementation times of either therapeutic or prevention studies, overall we observed wide variation in protocol development times. Moreover, we detected a trend toward phase III/IV therapeutic protocols exhibiting longer developmental (median 2 ½ years) and implementation times (>3years). We also found that protocols exceeding the median number of days for completing the development interval had significantly longer implementation. Limitations The use of a relatively small set of protocols may have limited our ability to detect differences across phase groupings. Some timing effects present for a specific study phase may have been masked by combining protocols into phase groupings. Presence of informative censoring, such as withdrawal of some protocols from development if they began showing signs of lost interest among investigators, complicates interpretation of Kaplan-Meier estimates. Because this study constitutes a retrospective examination over an extended period of time, it does not allow for the precise identification of relative factors impacting timing. Conclusions Delays not only increase the time and cost to complete clinical trials, but they also diminish their usefulness by failing to answer research questions in time. We believe that research analyzing the time spent traversing defined intervals across the clinical trial protocol development and implementation continuum can stimulate business process analyses and reengineering efforts that could lead to reductions in the time from clinical trial concept to results, thereby accelerating progress in clinical research. PMID:24980279

  8. Adapting and implementing an evidence-based sun-safety education program in rural Idaho, 2012.

    PubMed

    Cariou, Charlene; Gonzales, Melanie; Krebill, Hope

    2014-05-08

    Melanoma incidence and mortality rates in Idaho are higher than national averages. The importance of increased awareness of skin cancer has been cited by state and local organizations. St. Luke's Mountain States Tumor Institute (MSTI) prioritized educational outreach efforts to focus on the implementation of a skin cancer prevention program in rural Idaho. As a community cancer center, MSTI expanded cancer education services to include dedicated support to rural communities. Through this expansion, an MSTI educator sought to partner with a community organization to provide sun-safety education. MSTI selected, adapted, and implemented an evidence-based program, Pool Cool. The education program was implemented in 5 phases. In Phase I, we identified and recruited a community partner; in Phase 2, after thorough research, we selected a program, Pool Cool; in Phase 3, we planned the details of the program, including identification of desired short- and long-term outcomes and adaptation of existing program materials; in Phase 4, we implemented the program in summer 2012; in Phase 5, we assessed program sustainability and expansion. MSTI developed a sustainable partnership with Payette Municipal Pool, and in summer 2012, we implemented Pool Cool. Sun-safety education was provided to more than 700 young people aged 2 to 17 years, and educational signage and sunscreen benefitted hundreds of additional pool patrons. Community cancer centers are increasingly being asked to assess community needs and implement evidence-based prevention and screening programs. Clinical staff may become facilitators of evidence-based public health programs. Challenges of implementing evidence-based programs in the context of a community cancer centers are staffing, leveraging of resources, and ongoing training and support.

  9. Adapting and Implementing an Evidence-Based Sun-Safety Education Program in Rural Idaho, 2012

    PubMed Central

    Gonzales, Melanie; Krebill, Hope

    2014-01-01

    Background Melanoma incidence and mortality rates in Idaho are higher than national averages. The importance of increased awareness of skin cancer has been cited by state and local organizations. St. Luke’s Mountain States Tumor Institute (MSTI) prioritized educational outreach efforts to focus on the implementation of a skin cancer prevention program in rural Idaho. Community Context As a community cancer center, MSTI expanded cancer education services to include dedicated support to rural communities. Through this expansion, an MSTI educator sought to partner with a community organization to provide sun-safety education. MSTI selected, adapted, and implemented an evidence-based program, Pool Cool. Methods The education program was implemented in 5 phases. In Phase I, we identified and recruited a community partner; in Phase 2, after thorough research, we selected a program, Pool Cool; in Phase 3, we planned the details of the program, including identification of desired short- and long-term outcomes and adaptation of existing program materials; in Phase 4, we implemented the program in summer 2012; in Phase 5, we assessed program sustainability and expansion. Outcome MSTI developed a sustainable partnership with Payette Municipal Pool, and in summer 2012, we implemented Pool Cool. Sun-safety education was provided to more than 700 young people aged 2 to 17 years, and educational signage and sunscreen benefitted hundreds of additional pool patrons. Interpretation Community cancer centers are increasingly being asked to assess community needs and implement evidence-based prevention and screening programs. Clinical staff may become facilitators of evidence-based public health programs. Challenges of implementing evidence-based programs in the context of a community cancer centers are staffing, leveraging of resources, and ongoing training and support. PMID:24809363

  10. A complete solution of cartographic displacement based on elastic beams model and Delaunay triangulation

    NASA Astrophysics Data System (ADS)

    Liu, Y.; Guo, Q.; Sun, Y.

    2014-04-01

    In map production and generalization, it is inevitable to arise some spatial conflicts, but the detection and resolution of these spatial conflicts still requires manual operation. It is become a bottleneck hindering the development of automated cartographic generalization. Displacement is the most useful contextual operator that is often used for resolving the conflicts arising between two or more map objects. Automated generalization researches have reported many approaches of displacement including sequential approaches and optimization approaches. As an excellent optimization approach on the basis of energy minimization principles, elastic beams model has been used in resolving displacement problem of roads and buildings for several times. However, to realize a complete displacement solution, techniques of conflict detection and spatial context analysis should be also take into consideration. So we proposed a complete solution of displacement based on the combined use of elastic beams model and constrained Delaunay triangulation (CDT) in this paper. The solution designed as a cyclic and iterative process containing two phases: detection phase and displacement phase. In detection phase, CDT of map is use to detect proximity conflicts, identify spatial relationships and structures, and construct auxiliary structure, so as to support the displacement phase on the basis of elastic beams. In addition, for the improvements of displacement algorithm, a method for adaptive parameters setting and a new iterative strategy are put forward. Finally, we implemented our solution on a testing map generalization platform, and successfully tested it against 2 hand-generated test datasets of roads and buildings respectively.

  11. Improved Horvitz-Thompson Estimation of Model Parameters from Two-phase Stratified Samples: Applications in Epidemiology

    PubMed Central

    Breslow, Norman E.; Lumley, Thomas; Ballantyne, Christie M; Chambless, Lloyd E.; Kulich, Michal

    2009-01-01

    The case-cohort study involves two-phase sampling: simple random sampling from an infinite super-population at phase one and stratified random sampling from a finite cohort at phase two. Standard analyses of case-cohort data involve solution of inverse probability weighted (IPW) estimating equations, with weights determined by the known phase two sampling fractions. The variance of parameter estimates in (semi)parametric models, including the Cox model, is the sum of two terms: (i) the model based variance of the usual estimates that would be calculated if full data were available for the entire cohort; and (ii) the design based variance from IPW estimation of the unknown cohort total of the efficient influence function (IF) contributions. This second variance component may be reduced by adjusting the sampling weights, either by calibration to known cohort totals of auxiliary variables correlated with the IF contributions or by their estimation using these same auxiliary variables. Both adjustment methods are implemented in the R survey package. We derive the limit laws of coefficients estimated using adjusted weights. The asymptotic results suggest practical methods for construction of auxiliary variables that are evaluated by simulation of case-cohort samples from the National Wilms Tumor Study and by log-linear modeling of case-cohort data from the Atherosclerosis Risk in Communities Study. Although not semiparametric efficient, estimators based on adjusted weights may come close to achieving full efficiency within the class of augmented IPW estimators. PMID:20174455

  12. Business Acquisition and Implementation

    DTIC Science & Technology

    2006-01-01

    I am proposing that this technical paper be broken down into two phases. Phase one will consist of business and land acquisition. Phase two will...consist of business implementation. The business acquisition phase will document the process of forming a limited liability company (LLC) from a sole...proprietorship with the intention of real estate development and personal asset protection. I do not require a business license but I will need to

  13. Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Yaakob, Mazri; Ali, Wan Nur Athirah Wan; Radzuan, Kamaruddin

    2016-08-01

    Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions. This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study. The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs. Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations.

  14. Ab initio construction of magnetic phase diagrams in alloys: The case of Fe 1-xMn xPt

    DOE PAGES

    Pujari, B. S.; Larson, P.; Antropov, V. P.; ...

    2015-07-28

    A first-principles approach to the construction of concentration-temperature magnetic phase diagrams of metallic alloys is presented. The method employs self-consistent total energy calculations based on the coherent potential approximation for partially ordered and noncollinear magnetic states and is able to account for competing interactions and multiple magnetic phases. The application to the Fe 1–xMn xPt “magnetic chameleon” system yields the sequence of magnetic phases at T = 0 and the c-T magnetic phase diagram in good agreement with experiment, and a new low-temperature phase is predicted at the Mn-rich end. The importance of non-Heisenberg interactions for the description of themore » magnetic phase diagram is demonstrated.« less

  15. Cheshire charge in (3+1)-dimensional topological phases

    NASA Astrophysics Data System (ADS)

    Else, Dominic V.; Nayak, Chetan

    2017-07-01

    We show that (3 +1 ) -dimensional topological phases of matter generically support loop excitations with topological degeneracy. The loops carry "Cheshire charge": topological charge that is not the integral of a locally defined topological charge density. Cheshire charge has previously been discussed in non-Abelian gauge theories, but we show that it is a generic feature of all (3+1)-D topological phases (even those constructed from an Abelian gauge group). Indeed, Cheshire charge is closely related to nontrivial three-loop braiding. We use a dimensional reduction argument to compute the topological degeneracy of loop excitations in the (3 +1 ) -dimensional topological phases associated with Dijkgraaf-Witten gauge theories. We explicitly construct membrane operators associated with such excitations in soluble microscopic lattice models in Z2×Z2 Dijkgraaf-Witten phases and generalize this construction to arbitrary membrane-net models. We explain why these loop excitations are the objects in the braided fusion 2-category Z (2 VectGω) , thereby supporting the hypothesis that 2-categories are the correct mathematical framework for (3 +1 ) -dimensional topological phases.

  16. Highway construction related business impacts : phase 3 effort for the town of Dubois.

    DOT National Transportation Integrated Search

    2008-03-01

    Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...

  17. Phase-space topography characterization of nonlinear ultrasound waveforms.

    PubMed

    Dehghan-Niri, Ehsan; Al-Beer, Helem

    2018-03-01

    Fundamental understanding of ultrasound interaction with material discontinuities having closed interfaces has many engineering applications such as nondestructive evaluation of defects like kissing bonds and cracks in critical structural and mechanical components. In this paper, to analyze the acoustic field nonlinearities due to defects with closed interfaces, the use of a common technique in nonlinear physics, based on a phase-space topography construction of ultrasound waveform, is proposed. The central idea is to complement the "time" and "frequency" domain analyses with the "phase-space" domain analysis of nonlinear ultrasound waveforms. A nonlinear time series method known as pseudo phase-space topography construction is used to construct equivalent phase-space portrait of measured ultrasound waveforms. Several nonlinear models are considered to numerically simulate nonlinear ultrasound waveforms. The phase-space response of the simulated waveforms is shown to provide different topographic information, while the frequency domain shows similar spectral behavior. Thus, model classification can be substantially enhanced in the phase-space domain. Experimental results on high strength aluminum samples show that the phase-space transformation provides a unique detection and classification capabilities. The Poincaré map of the phase-space domain is also used to better understand the nonlinear behavior of ultrasound waveforms. It is shown that the analysis of ultrasound nonlinearities is more convenient and informative in the phase-space domain than in the frequency domain. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  19. DNA cytoskeleton for stabilizing artificial cells.

    PubMed

    Kurokawa, Chikako; Fujiwara, Kei; Morita, Masamune; Kawamata, Ibuki; Kawagishi, Yui; Sakai, Atsushi; Murayama, Yoshihiro; Nomura, Shin-Ichiro M; Murata, Satoshi; Takinoue, Masahiro; Yanagisawa, Miho

    2017-07-11

    Cell-sized liposomes and droplets coated with lipid layers have been used as platforms for understanding live cells, constructing artificial cells, and implementing functional biomedical tools such as biosensing platforms and drug delivery systems. However, these systems are very fragile, which results from the absence of cytoskeletons in these systems. Here, we construct an artificial cytoskeleton using DNA nanostructures. The designed DNA oligomers form a Y-shaped nanostructure and connect to each other with their complementary sticky ends to form networks. To undercoat lipid membranes with this DNA network, we used cationic lipids that attract negatively charged DNA. By encapsulating the DNA into the droplets, we successfully created a DNA shell underneath the membrane. The DNA shells increased interfacial tension, elastic modulus, and shear modulus of the droplet surface, consequently stabilizing the lipid droplets. Such drastic changes in stability were detected only when the DNA shell was in the gel phase. Furthermore, we demonstrate that liposomes with the DNA gel shell are substantially tolerant against outer osmotic shock. These results clearly show the DNA gel shell is a stabilizer of the lipid membrane akin to the cytoskeleton in live cells.

  20. Solar power satellite system definition study, phase 2.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.

  1. Base of the upper layer of the phase-three Elkhorn-Loup groundwater-flow model, north-central Nebraska

    USGS Publications Warehouse

    Stanton, Jennifer S.

    2013-01-01

    The Elkhorn and Loup Rivers in Nebraska provide water for irrigation, recreation, hydropower produc­tion, aquatic life, and municipal water systems for the Omaha and Lincoln metropolitan areas. Groundwater is another important resource in the region and is extracted primarily for agricultural irrigation. Water managers of the area are interested in balancing and sustaining the long-term uses of these essential surface-water and groundwater resources. Thus, a cooperative study was established in 2006 to compile reliable data describing hydrogeologic properties and water-budget components and to improve the understanding of stream-aquifer interactions in the Elkhorn and Loup River Basins. A groundwater-flow model was constructed as part of the first two phases of that study as a tool for under­standing the effect of groundwater pumpage on stream base flow and the effects of management strategies on hydrologically connected groundwater and surface-water supplies. The third phase of the study was implemented to gain additional geologic knowledge and update the ELM with enhanced water-budget information and refined discretization of the model grid and stress periods. As part of that effort, the ELM is being reconstructed to include two vertical model layers, whereas phase-one and phase-two simulations represented the aquifer system using one vertical model layer. This report presents a map of and methods for developing the elevation of the base of the upper model layer for the phase-three ELM. Digital geospatial data of elevation contours and geologic log sites used to esti­mate elevation contours are available as part of this report.

  2. Multimodal pressure-flow method to assess dynamics of cerebral autoregulation in stroke and hypertension.

    PubMed

    Novak, Vera; Yang, Albert C C; Lepicovsky, Lukas; Goldberger, Ary L; Lipsitz, Lewis A; Peng, Chung-Kang

    2004-10-25

    This study evaluated the effects of stroke on regulation of cerebral blood flow in response to fluctuations in systemic blood pressure (BP). The autoregulatory dynamics are difficult to assess because of the nonstationarity and nonlinearity of the component signals. We studied 15 normotensive, 20 hypertensive and 15 minor stroke subjects (48.0 +/- 1.3 years). BP and blood flow velocities (BFV) from middle cerebral arteries (MCA) were measured during the Valsalva maneuver (VM) using transcranial Doppler ultrasound. A new technique, multimodal pressure-flow analysis (MMPF), was implemented to analyze these short, nonstationary signals. MMPF analysis decomposes complex BP and BFV signals into multiple empirical modes, representing their instantaneous frequency-amplitude modulation. The empirical mode corresponding to the VM BP profile was used to construct the continuous phase diagram and to identify the minimum and maximum values from the residual BP (BPR) and BFV (BFVR) signals. The BP-BFV phase shift was calculated as the difference between the phase corresponding to the BPR and BFVR minimum (maximum) values. BP-BFV phase shifts were significantly different between groups. In the normotensive group, the BFVR minimum and maximum preceded the BPR minimum and maximum, respectively, leading to large positive values of BP-BFV shifts. In the stroke and hypertensive groups, the resulting BP-BFV phase shift was significantly smaller compared to the normotensive group. A standard autoregulation index did not differentiate the groups. The MMPF method enables evaluation of autoregulatory dynamics based on instantaneous BP-BFV phase analysis. Regulation of BP-BFV dynamics is altered with hypertension and after stroke, rendering blood flow dependent on blood pressure.

  3. A conservative fully implicit algorithm for predicting slug flows

    NASA Astrophysics Data System (ADS)

    Krasnopolsky, Boris I.; Lukyanov, Alexander A.

    2018-02-01

    An accurate and predictive modelling of slug flows is required by many industries (e.g., oil and gas, nuclear engineering, chemical engineering) to prevent undesired events potentially leading to serious environmental accidents. For example, the hydrodynamic and terrain-induced slugging leads to unwanted unsteady flow conditions. This demands the development of fast and robust numerical techniques for predicting slug flows. The presented in this paper study proposes a multi-fluid model and its implementation method accounting for phase appearance and disappearance. The numerical modelling of phase appearance and disappearance presents a complex numerical challenge for all multi-component and multi-fluid models. Numerical challenges arise from the singular systems of equations when some phases are absent and from the solution discontinuity when some phases appear or disappear. This paper provides a flexible and robust solution to these issues. A fully implicit formulation described in this work enables to efficiently solve governing fluid flow equations. The proposed numerical method provides a modelling capability of phase appearance and disappearance processes, which is based on switching procedure between various sets of governing equations. These sets of equations are constructed using information about the number of phases present in the computational domain. The proposed scheme does not require an explicit truncation of solutions leading to a conservative scheme for mass and linear momentum. A transient two-fluid model is used to verify and validate the proposed algorithm for conditions of hydrodynamic and terrain-induced slug flow regimes. The developed modelling capabilities allow to predict all the major features of the experimental data, and are in a good quantitative agreement with them.

  4. Atomic density functional and diagram of structures in the phase field crystal model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ankudinov, V. E., E-mail: vladimir@ankudinov.org; Galenko, P. K.; Kropotin, N. V.

    2016-02-15

    The phase field crystal model provides a continual description of the atomic density over the diffusion time of reactions. We consider a homogeneous structure (liquid) and a perfect periodic crystal, which are constructed from the one-mode approximation of the phase field crystal model. A diagram of 2D structures is constructed from the analytic solutions of the model using atomic density functionals. The diagram predicts equilibrium atomic configurations for transitions from the metastable state and includes the domains of existence of homogeneous, triangular, and striped structures corresponding to a liquid, a body-centered cubic crystal, and a longitudinal cross section of cylindricalmore » tubes. The method developed here is employed for constructing the diagram for the homogeneous liquid phase and the body-centered iron lattice. The expression for the free energy is derived analytically from density functional theory. The specific features of approximating the phase field crystal model are compared with the approximations and conclusions of the weak crystallization and 2D melting theories.« less

  5. Reconstruction of phase maps from the configuration of phase singularities in two-dimensional manifolds.

    PubMed

    Herlin, Antoine; Jacquemet, Vincent

    2012-05-01

    Phase singularity analysis provides a quantitative description of spiral wave patterns observed in chemical or biological excitable media. The configuration of phase singularities (locations and directions of rotation) is easily derived from phase maps in two-dimensional manifolds. The question arises whether one can construct a phase map with a given configuration of phase singularities. The existence of such a phase map is guaranteed provided that the phase singularity configuration satisfies a certain constraint associated with the topology of the supporting medium. This paper presents a constructive mathematical approach to numerically solve this problem in the plane and on the sphere as well as in more general geometries relevant to atrial anatomy including holes and a septal wall. This tool can notably be used to create initial conditions with a controllable spiral wave configuration for cardiac propagation models and thus help in the design of computer experiments in atrial electrophysiology.

  6. Time-domain full waveform inversion using instantaneous phase information with damping

    NASA Astrophysics Data System (ADS)

    Luo, Jingrui; Wu, Ru-Shan; Gao, Fuchun

    2018-06-01

    In time domain, the instantaneous phase can be obtained from the complex seismic trace using Hilbert transform. The instantaneous phase information has great potential in overcoming the local minima problem and improving the result of full waveform inversion. However, the phase wrapping problem, which comes from numerical calculation, prevents its application. In order to avoid the phase wrapping problem, we choose to use the exponential phase combined with the damping method, which gives instantaneous phase-based multi-stage inversion. We construct the objective functions based on the exponential instantaneous phase, and also derive the corresponding gradient operators. Conventional full waveform inversion and the instantaneous phase-based inversion are compared with numerical examples, which indicates that in the case without low frequency information in seismic data, our method is an effective and efficient approach for initial model construction for full waveform inversion.

  7. Implementation of an Anesthesia Information Management System in an Ambulatory Surgery Center.

    PubMed

    Mudumbai, Seshadri C

    2016-01-01

    Anesthesia information management systems (AIMS) are increasingly being implemented throughout the United States. However, little information exists on the implementation process for AIMS within ambulatory surgery centers (ASC). The objectives of this descriptive study are to document: 1) the phases of implementation of an AIMS at an ASC; and 2) lessons learnt from a socio-technical perspective. The ASC, within the Veterans Health Administration (VHA), has hosted an AIMS since 2008. As a quality improvement effort, we implemented a new version of the AIMS. This new version involved fundamental software changes to enhance clinical care such as real-time importing of laboratory data and total hardware exchange. The pre-implementation phase involved coordinated preparation over six months between multiple informatics teams along with local leadership. During this time, we conducted component, integration, and validation testing to ensure correct data flow from medical devices to AIMS and centralized databases. The implementation phase occurred in September 2014 over three days and was successful. Over the next several months, during post-implementation phase, we addressed residual items like latency of the application. Important lessons learnt from the implementation included the utility of partnering early with executive leadership; ensuring end user acceptance of new clinical workflow; continuous testing of data flow; use of a staged rollout; and providing additional personnel throughout implementation. Implementation of an AIMS at an ASC can utilize methods developed for large hospitals. However, issues unique to an ASC such as limited number of support personnel and distinctive workflows must be considered.

  8. 48 CFR 36.303-2 - Phase Two.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... potential phase-two technical evaluation factors include design concepts, management approach, key personnel... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection...

  9. Microwave impregnation of porous materials with thermal energy storage materials

    DOEpatents

    Benson, David K.; Burrows, Richard W.

    1993-01-01

    A method for impregnating a porous, non-metallic construction material with a solid phase-change material is described. The phase-change material in finely divided form is spread onto the surface of the porous material, after which the porous material is exposed to microwave energy for a time sufficient to melt the phase-change material. The melted material is spontaneously absorbed into the pores of the porous material. A sealing chemical may also be included with the phase-change material (or applied subsequent to the phase-change material) to seal the surface of the porous material. Fire retardant chemicals may also be included with the phase-change materials. The treated construction materials are better able to absorb thermal energy and exhibit increased heat storage capacity.

  10. Microwave impregnation of porous materials with thermal energy storage materials

    DOEpatents

    Benson, D.K.; Burrows, R.W.

    1993-04-13

    A method for impregnating a porous, non-metallic construction material with a solid phase-change material is described. The phase-change material in finely divided form is spread onto the surface of the porous material, after which the porous material is exposed to microwave energy for a time sufficient to melt the phase-change material. The melted material is spontaneously absorbed into the pores of the porous material. A sealing chemical may also be included with the phase-change material (or applied subsequent to the phase-change material) to seal the surface of the porous material. Fire retardant chemicals may also be included with the phase-change materials. The treated construction materials are better able to absorb thermal energy and exhibit increased heat storage capacity.

  11. 76 FR 12088 - Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Federal Loan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Federal Loan Guarantee To Support Construction of Phase II of the Mid-Atlantic Power Pathway Transmission...) to support construction of Phase II of the Mid-Atlantic Power Pathway (MAPP) transmission line... 20585. Electronic submission of comments is encouraged due to processing time required for regular mail...

  12. Understanding BIM Adoption in the AEC Industry: The Case of Jordan

    NASA Astrophysics Data System (ADS)

    Btoush, M.; Haron, AT

    2017-11-01

    Building information modelling (BIM) is a new and powerful technology implemented by many countries. The construction industry in Jordan plays a vital role and contributes immensely to the economic growth and development. In order to boost the industry and the economy, many industry players including engineers and contractors have recommended the implementation of BIM in Jordan. However, research demonstrates that successful BIM implementation is possible through the awareness of the different levels of BIM, which is a basic precondition for BIM implementation. Without a clear understanding of BIM, many companies would be unable to fully achieve BIM potentials or implement BIM in their building lifecycle. The objective of this study is to assess the current awareness of BIM technology in the Jordanian construction industry. A field interviews were conducted and 15 responses were collected and. The findings indicate that a significant proportion of respondents have little or no understanding of the concept of BIM. Also, the usage was found to be very low. Based on the results, a holistic roadmap was developed to spread the BIM adoption through the Jordanian construction industry. It is expected that this roadmap would lead to a better understanding and enable the industry towards more extensive implementation of BIM.

  13. Building America Case Study: Zero Energy Ready Home and the Challenge of Hot Water on Demand, Denver, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    "This report outlines the steps a developer can use when looking to create and implement higher performance standards such as the U.S. Department of Energy (DOE) Zero Energy Ready Home (ZERH) standards in a community. The report also describes the specific examples of how this process was followed by a developer, Forest City, in the Stapleton community in Denver, Colorado. IBACOS described the steps used to begin to bring the DOE ZERH standard to the Forest City Stapleton community based on 15 years of community-scale development work done by IBACOS. As a result of this prior IBACOS work, the teammore » gained an understanding of the various components that a master developer needs to consider and created strategies for incorporating those components in the initial phases of development to achieve higher performance buildings in the community. An automated scoring system can be used to perform an internal audit that provides a detailed and consistent evaluation of how several homes under construction or builders' floor plans compare with the requirements of the DOE Zero Energy Ready Home program. This audit can be performed multiple times at specific milestones during construction to allow the builder to make changes as needed throughout construction for the project to meet Zero Energy Ready Home standards. This scoring system also can be used to analyze a builder's current construction practices and design.« less

  14. Linked symptom monitoring and depression treatment programmes for specialist cancer services: protocol for a mixed-methods implementation study

    PubMed Central

    Walker, Jane; Burke, Katy; Sevdalis, Nick; Richardson, Alison; Mulick, Amy; Frost, Chris; Sharpe, Michael

    2017-01-01

    Introduction There is growing awareness that cancer services need to address patients’ well-being as well as treating their cancer. We developed systematic approaches to (1) monitoring patients’ symptoms including depression using a ‘Symptom Monitoring Service’ and (2) providing treatment for those with major depression using a programme called ‘Depression Care for People with Cancer’. Used together, these two programmes were found to be highly effective and cost-effective in clinical trials. The overall aims of this project are to: (1) study the process of introducing these programmes into routine clinical care in a large cancer service, (2) identify the challenges associated with implementation and how these are overcome, (3) determine their effectiveness in a routine non-research setting and (4) describe patients’ and clinicians’ experience of the programmes. Methods and analysis This is a mixed-methods longitudinal implementation study. We will study the process of implementation in three phases (April 2016–December 2018): ‘Pre-implementation’ (setting up of the new programmes), ‘Early Implementation’ (implementation of the programmes in a small number of clinics) and ‘Implementation and Maintenance’ (implementation in the majority of clinics). We will use the following methods of data collection: (1) contemporaneous logs of the implementation process, (2) interviews with healthcare professionals and managers, (3) interviews with patients and (4) routinely collected clinical data. Ethics and dissemination The study has been reviewed by a joint committee of Oxford University Hospitals National Health Service Foundation Trust Research and Development Department and the University of Oxford’s Clinical Trials and Research Governance Department and judged to be service evaluation, not requiring ethics committee approval. The findings of this study will guide the scaling up implementation of the programmes across the UK and will enable us to construct an implementation toolkit. We will disseminate our findings in publications and at relevant national and international conferences. PMID:28674143

  15. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...

  16. Wire constructions of Abelian topological phases in three or more dimensions

    NASA Astrophysics Data System (ADS)

    Iadecola, Thomas; Neupert, Titus; Chamon, Claudio; Mudry, Christopher

    2016-05-01

    Coupled-wire constructions have proven to be useful tools to characterize Abelian and non-Abelian topological states of matter in two spatial dimensions. In many cases, their success has been complemented by the vast arsenal of other theoretical tools available to study such systems. In three dimensions, however, much less is known about topological phases. Since the theoretical arsenal in this case is smaller, it stands to reason that wire constructions, which are based on one-dimensional physics, could play a useful role in developing a greater microscopic understanding of three-dimensional topological phases. In this paper, we provide a comprehensive strategy, based on the geometric arrangement of commuting projectors in the toric code, to generate and characterize coupled-wire realizations of strongly interacting three-dimensional topological phases. We show how this method can be used to construct pointlike and linelike excitations, and to determine the topological degeneracy. We also point out how, with minor modifications, the machinery already developed in two dimensions can be naturally applied to study the surface states of these systems, a fact that has implications for the study of surface topological order. Finally, we show that the strategy developed for the construction of three-dimensional topological phases generalizes readily to arbitrary dimensions, vastly expanding the existing landscape of coupled-wire theories. Throughout the paper, we discuss Zm topological order in three and four dimensions as a concrete example of this approach, but the approach itself is not limited to this type of topological order.

  17. Sensorized Garments and Textrode-Enabled Measurement Instrumentation for Ambulatory Assessment of the Autonomic Nervous System Response in the ATREC Project

    PubMed Central

    Seoane, Fernando; Ferreira, Javier; Alvarez, Lorena; Buendia, Ruben; Ayllón, David; Llerena, Cosme; Gil-Pita, Roberto

    2013-01-01

    Advances in textile materials, technology and miniaturization of electronics for measurement instrumentation has boosted the development of wearable measurement systems. In several projects sensorized garments and non-invasive instrumentation have been integrated to assess on emotional, cognitive responses as well as physical arousal and status of mental stress through the study of the autonomous nervous system. Assessing the mental state of workers under stressful conditions is critical to identify which workers are in the proper state of mind and which are not ready to undertake a mission, which might consequently risk their own life and the lives of others. The project Assessment in Real Time of the Stress in Combatants (ATREC) aims to enable real time assessment of mental stress of the Spanish Armed Forces during military activities using a wearable measurement system containing sensorized garments and textile-enabled non-invasive instrumentation. This work describes the multiparametric sensorized garments and measurement instrumentation implemented in the first phase of the project required to evaluate physiological indicators and recording candidates that can be useful for detection of mental stress. For such purpose different sensorized garments have been constructed: a textrode chest-strap system with six repositionable textrodes, a sensorized glove and an upper-arm strap. The implemented textile-enabled instrumentation contains one skin galvanometer, two temperature sensors for skin and environmental temperature and an impedance pneumographer containing a 1-channel ECG amplifier to record cardiogenic biopotentials. With such combinations of garments and non-invasive measurement devices, a multiparametric wearable measurement system has been implemented able to record the following physiological parameters: heart and respiration rate, skin galvanic response, environmental and peripheral temperature. To ensure the proper functioning of the implemented garments and devices the full series of 12 sets have been functionally tested recording cardiogenic biopotential, thoracic impedance, galvanic skin response and temperature values. The experimental results indicate that the implemented wearable measurement systems operate according to the specifications and are ready to be used for mental stress experiments, which will be executed in the coming phases of the project with dozens of healthy volunteers. PMID:23857264

  18. Sensorized garments and textrode-enabled measurement instrumentation for ambulatory assessment of the autonomic nervous system response in the ATREC project.

    PubMed

    Seoane, Fernando; Ferreira, Javier; Alvarez, Lorena; Buendia, Ruben; Ayllón, David; Llerena, Cosme; Gil-Pita, Roberto

    2013-07-12

    Advances in textile materials, technology and miniaturization of electronics for measurement instrumentation has boosted the development of wearable measurement systems. In several projects sensorized garments and non-invasive instrumentation have been integrated to assess on emotional, cognitive responses as well as physical arousal and status of mental stress through the study of the autonomous nervous system. Assessing the mental state of workers under stressful conditions is critical to identify which workers are in the proper state of mind and which are not ready to undertake a mission, which might consequently risk their own life and the lives of others. The project Assessment in Real Time of the Stress in Combatants (ATREC) aims to enable real time assessment of mental stress of the Spanish Armed Forces during military activities using a wearable measurement system containing sensorized garments and textile-enabled non-invasive instrumentation. This work describes the multiparametric sensorized garments and measurement instrumentation implemented in the first phase of the project required to evaluate physiological indicators and recording candidates that can be useful for detection of mental stress. For such purpose different sensorized garments have been constructed: a textrode chest-strap system with six repositionable textrodes, a sensorized glove and an upper-arm strap. The implemented textile-enabled instrumentation contains one skin galvanometer, two temperature sensors for skin and environmental temperature and an impedance pneumographer containing a 1-channel ECG amplifier to record cardiogenic biopotentials. With such combinations of garments and non-invasive measurement devices, a multiparametric wearable measurement system has been implemented able to record the following physiological parameters: heart and respiration rate, skin galvanic response, environmental and peripheral temperature. To ensure the proper functioning of the implemented garments and devices the full series of 12 sets have been functionally tested recording cardiogenic biopotential, thoracic impedance, galvanic skin response and temperature values. The experimental results indicate that the implemented wearable measurement systems operate according to the specifications and are ready to be used for mental stress experiments, which will be executed in the coming phases of the project with dozens of healthy volunteers.

  19. Barriers and Enablers to Implementation of Dietary Guidelines in Early Childhood Education Centers in Australia: Application of the Theoretical Domains Framework.

    PubMed

    Grady, Alice; Seward, Kirsty; Finch, Meghan; Fielding, Alison; Stacey, Fiona; Jones, Jannah; Wolfenden, Luke; Yoong, Sze Lin

    2018-03-01

    To identify perceived barriers and enablers to implementation of dietary guidelines reported by early childhood education center cooks, and barriers and enablers associated with greater implementation based on assessment of center menu compliance. Cross-sectional telephone interview. Early childhood education centers, New South Wales, Australia. A total of 202 cooks responsible for menu planning; 70 centers provided a menu for review of compliance with dietary guidelines. Barriers and enablers to dietary guideline implementation were determined using a tool assessing constructs of the Theoretical Domains Framework (TDF). Higher scores (≥6) for each construct indicated enablers to guideline implementation; lower scores (<6) suggested barriers. Multivariable linear regression identified TDF constructs associated with greater guideline implementation. Scores were lowest for reinforcement (mean, 5.85) and goals (mean, 5.89) domains, and highest for beliefs about consequences (mean, 6.51) and social/professional role and identity (mean, 6.50). The skills domain was positively associated with greater implementation of guidelines based on menu review (P = .01). Cooks perceived social/professional role and identity, and beliefs about consequences to be enablers to dietary guideline implementation; however, only the skills domain was associated with greater implementation. There are opportunities to target the incongruence in perceptions vs reality of the barriers and enablers to implementation. Future research could examine the utility of the TDF to identify barriers and enablers to implementation to inform intervention development and for evaluating interventions to examine intervention mechanisms. Copyright © 2017 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  20. Utilization of building information modeling in infrastructure’s design and construction

    NASA Astrophysics Data System (ADS)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  1. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    PubMed Central

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176

  2. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    PubMed

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  3. 25 CFR 900.112 - What are construction phases?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... phase. The phase during which an initial assessment and determination of project need is made and... services are provided. This phase can include conducting and preparing a detailed needs assessment... assessments and associated activities. ...

  4. 25 CFR 900.112 - What are construction phases?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... phase. The phase during which an initial assessment and determination of project need is made and... services are provided. This phase can include conducting and preparing a detailed needs assessment... assessments and associated activities. ...

  5. 25 CFR 900.112 - What are construction phases?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... phase. The phase during which an initial assessment and determination of project need is made and... services are provided. This phase can include conducting and preparing a detailed needs assessment... assessments and associated activities. ...

  6. 25 CFR 900.112 - What are construction phases?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... phase. The phase during which an initial assessment and determination of project need is made and... services are provided. This phase can include conducting and preparing a detailed needs assessment... assessments and associated activities. ...

  7. 25 CFR 900.112 - What are construction phases?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... phase. The phase during which an initial assessment and determination of project need is made and... services are provided. This phase can include conducting and preparing a detailed needs assessment... assessments and associated activities. ...

  8. A novel constructive-optimizer neural network for the traveling salesman problem.

    PubMed

    Saadatmand-Tarzjan, Mahdi; Khademi, Morteza; Akbarzadeh-T, Mohammad-R; Moghaddam, Hamid Abrishami

    2007-08-01

    In this paper, a novel constructive-optimizer neural network (CONN) is proposed for the traveling salesman problem (TSP). CONN uses a feedback structure similar to Hopfield-type neural networks and a competitive training algorithm similar to the Kohonen-type self-organizing maps (K-SOMs). Consequently, CONN is composed of a constructive part, which grows the tour and an optimizer part to optimize it. In the training algorithm, an initial tour is created first and introduced to CONN. Then, it is trained in the constructive phase for adding a number of cities to the tour. Next, the training algorithm switches to the optimizer phase for optimizing the current tour by displacing the tour cities. After convergence in this phase, the training algorithm switches to the constructive phase anew and is continued until all cities are added to the tour. Furthermore, we investigate a relationship between the number of TSP cities and the number of cities to be added in each constructive phase. CONN was tested on nine sets of benchmark TSPs from TSPLIB to demonstrate its performance and efficiency. It performed better than several typical Neural networks (NNs), including KNIES_TSP_Local, KNIES_TSP_Global, Budinich's SOM, Co-Adaptive Net, and multivalued Hopfield network as wall as computationally comparable variants of the simulated annealing algorithm, in terms of both CPU time and accuracy. Furthermore, CONN converged considerably faster than expanding SOM and evolved integrated SOM and generated shorter tours compared to KNIES_DECOMPOSE. Although CONN is not yet comparable in terms of accuracy with some sophisticated computationally intensive algorithms, it converges significantly faster than they do. Generally speaking, CONN provides the best compromise between CPU time and accuracy among currently reported NNs for TSP.

  9. Implementation and Testing of Low Cost Uav Platform for Orthophoto Imaging

    NASA Astrophysics Data System (ADS)

    Brucas, D.; Suziedelyte-Visockiene, J.; Ragauskas, U.; Berteska, E.; Rudinskas, D.

    2013-08-01

    Implementation of Unmanned Aerial Vehicles for civilian applications is rapidly increasing. Technologies which were expensive and available only for military use have recently spread on civilian market. There is a vast number of low cost open source components and systems for implementation on UAVs available. Using of low cost hobby and open source components ensures considerable decrease of UAV price, though in some cases compromising its reliability. In Space Science and Technology Institute (SSTI) in collaboration with Vilnius Gediminas Technical University (VGTU) researches have been performed in field of constructing and implementation of small UAVs composed of low cost open source components (and own developments). Most obvious and simple implementation of such UAVs - orthophoto imaging with data download and processing after the flight. The construction, implementation of UAVs, flight experience, data processing and data implementation will be further covered in the paper and presentation.

  10. Retrofit implementation of Zernike phase plate imaging for cryo-TEM

    PubMed Central

    Marko, Michael; Leith, ArDean; Hsieh, Chyongere; Danev, Radostin

    2011-01-01

    In-focus phase-plate imaging is particularly beneficial for cryo-TEM because it offers a substantial overall increase in image contrast, without an electron dose penalty, and it simplifies image interpretation. We show how phase-plate cryo-TEM can be implemented with an appropriate existing TEM, and provide a basic practical introduction to use of thin-film (carbon) phase plates. We point out potential pitfalls of phase-plate operation, and discuss solutions. We provide information on evaluating a particular TEM for its suitability. PMID:21272647

  11. Site Selection for the Disposal of LLW in Taiwan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chuang, W.S.; Chi, L.M.; Tien, N.C.

    2006-07-01

    This paper presents the implementation status of the low-level radioactive waste (LLW) disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes and preliminary disposal concepts. The first phase of site selection for low-level radioactive waste final disposal in Taiwan was implemented between 1992 and 2002. The site selection process adopted a Geographic Information System (GIS), Hierarchical Analysis System, Expert Evaluation System, and site reconnaissance. An incentive program for voluntary sites was also initiated. After a series of evaluations and discussion of 30 potentialmore » candidate sites, including 8 recommended sites, 5 qualified voluntary townships, and several remote uninhabited small islets, Hsiao-chiou islet was selected as the first priority candidate site in February 1998. The geological investigation work in Hsiao-chiou was conducted from March 1999 through October 2000. An Environmental Impact Statement Report (EIS) and the Investment Feasibility Study Report (IFS) were submitted to the Environmental Protection Agency (EPA) in November 2000 and to the Ministry of Economic Affairs (MOEA) in June 2001, respectively. Unfortunately, the site investigation was discontinued in 2002 due to political and public acceptance consideration. After years of planning, the second phase of the site selection process was launched in August 2004 and will be conducted through 2008. It is planned that a repository will be constructed in early 2009 and start to operate in 2014. The site selection process for the second phase is based on the earlier work and four potential candidate sites were selected for evaluation until 2005. A near surface disposal concept is proposed for a site located in the Taiwan strait, and cavern disposal concepts are proposed for three other sites located on the main island. This paper presents the implementation status of the LLW disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes, and preliminary disposal concepts 'NIMBY' (Not in my backyard) is a critical problem for implementation of the final disposal project. Resistance from local communities has been continuously received during site characterization. To overcome this, an incentive program to encourage community acceptance has been approved by the Government. Programs for community promotion are being proposed and negotiations are also underway. (authors)« less

  12. Consensus-Based Course Design and Implementation of Constructive Alignment Theory in a Power System Analysis Course

    ERIC Educational Resources Information Center

    Vanfretti, Luigi; Farrokhabadi, Mostafa

    2015-01-01

    This article presents the implementation of the constructive alignment theory (CAT) in a power system analysis course through a consensus-based course design process. The consensus-based design process involves both the instructor and graduate-level students and it aims to develop the CAT framework in a holistic manner with the goal of including…

  13. Implementation of GPS controlled highway construction equipment.

    DOT National Transportation Integrated Search

    2007-04-01

    dozers, motor graders, and excavators is quickly becoming common place in private sector construction because it speeds project delivery and cuts costs. Use of this technology is expanding quickly into other construction equipment areas such as paver...

  14. Implementation of warranties in state contracts for highway construction.

    DOT National Transportation Integrated Search

    2012-04-01

    In 1997, The Louisiana House of Representatives passed Bill Number 1698, which addresses warranties in state : contracts for highway construction. This bill stated that every contract for the construction of or improvements to : highways will include...

  15. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  16. Improving image quality in laboratory x-ray phase-contrast imaging

    NASA Astrophysics Data System (ADS)

    De Marco, F.; Marschner, M.; Birnbacher, L.; Viermetz, M.; Noël, P.; Herzen, J.; Pfeiffer, F.

    2017-03-01

    Grating-based X-ray phase-contrast (gbPC) is known to provide significant benefits for biomedical imaging. To investigate these benefits, a high-sensitivity gbPC micro-CT setup for small (≍ 5 cm) biological samples has been constructed. Unfortunately, high differential-phase sensitivity leads to an increased magnitude of data processing artifacts, limiting the quality of tomographic reconstructions. Most importantly, processing of phase-stepping data with incorrect stepping positions can introduce artifacts resembling Moiré fringes to the projections. Additionally, the focal spot size of the X-ray source limits resolution of tomograms. Here we present a set of algorithms to minimize artifacts, increase resolution and improve visual impression of projections and tomograms from the examined setup. We assessed two algorithms for artifact reduction: Firstly, a correction algorithm exploiting correlations of the artifacts and differential-phase data was developed and tested. Artifacts were reliably removed without compromising image data. Secondly, we implemented a new algorithm for flatfield selection, which was shown to exclude flat-fields with strong artifacts. Both procedures successfully improved image quality of projections and tomograms. Deconvolution of all projections of a CT scan can minimize blurring introduced by the finite size of the X-ray source focal spot. Application of the Richardson-Lucy deconvolution algorithm to gbPC-CT projections resulted in an improved resolution of phase-contrast tomograms. Additionally, we found that nearest-neighbor interpolation of projections can improve the visual impression of very small features in phase-contrast tomograms. In conclusion, we achieved an increase in image resolution and quality for the investigated setup, which may lead to an improved detection of very small sample features, thereby maximizing the setup's utility.

  17. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  18. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  19. 24 CFR 1003.509 - Force account construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Force account construction. 1003... Administration § 1003.509 Force account construction. (a) The use of tribal work forces for construction or... Area ONAP before the start of project implementation. In reviewing requests for an approval of force...

  20. 42 CFR 137.362 - May construction project agreements be amended?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  1. Volterra integral equation-factorisation method and nucleus-nucleus elastic scattering

    NASA Astrophysics Data System (ADS)

    Laha, U.; Majumder, M.; Bhoi, J.

    2018-04-01

    An approximate solution for the nuclear Hulthén plus atomic Hulthén potentials is constructed by solving the associated Volterra integral equation by series substitution method. Within the framework of supersymmetry-inspired factorisation method, this solution is exploited to construct higher partial wave interactions. The merit of our approach is examined by computing elastic scattering phases of the α {-}α system by the judicious use of phase function method. Reasonable agreements in phase shifts are obtained with standard data.

  2. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  3. Use of formwork systems in high-rise construction

    NASA Astrophysics Data System (ADS)

    Kurakova, Oksana

    2018-03-01

    Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  4. Creating an outcomes framework.

    PubMed

    Doerge, J B

    2000-01-01

    Four constructs used to build a framework for outcomes management for a large midwestern tertiary hospital are described in this article. A system framework outlining a model of clinical integration and population management based in Steven Shortell's work is discussed. This framework includes key definitions of high-risk patients, target groups, populations and community. Roles for each level of population management and how they were implemented in the health care system are described. A point of service framework centered on seven dimensions of care is the next construct applied on each nursing unit. The third construct outlines the framework for role development. Three roles for nursing were created to implement strategies for target groups that are strategic disease categories; two of those roles are described in depth. The philosophy of nursing practice is centered on caring and existential advocacy. The final construct is the modification of the Dartmouth model as a common framework for outcomes. System applications of the scorecard and lessons learned in the 2-year process of implementation are shared

  5. Improved cost monitoring and control through the Earned Value Management System

    NASA Astrophysics Data System (ADS)

    Hunter, Howard; Fitzgerald, Richard; Barlow, Dewey

    2014-01-01

    As economic pressure and competition for budget among federal agencies has increased, there has been an increasing need for more granular data and robust management information systems. This is especially true for the execution of major civilian space programs. This need has resulted in new program management requirements being implemented in an attempt to limit cost and schedule growth. In particular, NASA Procedural Requirements (NPR) 7120.5D requires the implementation of an Earned Value Management System (EVMS) compliant with the requirements of American National Standards Institute (ANSI)/Electronic Industries Alliance Standard 748-B. The Radiation Belt Storm Probes (RBSP) program management team at The Johns Hopkins University Applied Physics Laboratory (JHU/APL) made a decision to implement an EVMS on RBSP during Phase B—a year earlier than specified in the contractual Phase C reporting requirement as defined in the NPR. This decision was made so that the project would have the benefit of 12 months of training and hands-on implementation during Phase B. Although there were a number of technical and process hurdles encountered during Phase B and into Phase C, the system was working well when the Integrated Baseline Review (IBR) was held in August 2009. The IBR was a success because it met the review requirements. It was also clear to all IBR participants that the EVMS was providing value to the project management team. Although the IBR pointed out some areas of concern regarding process and ANSI compliance, the system had markedly improved the project's ability to monitor cost and schedule. This, in turn, allowed the project team to foresee problems in advance, formulate corrective actions, and implement course corrections without causing significant adverse impact to the project. Opponents of EVMS systems often communicate the unfavorable opinion that EVMS systems create unnecessary cost and administration. Although it is undeniable that EVMS implementation does not occur without cost, the cost is minimal in comparison to the benefits of successful implementation. This paper will focus on the implementation of EVMS on the RBSP project, explain EV processes and the implementation's cost, and analyze the benefits of EVMS to provide insight into cost/benefit considerations for other projects considering EVMS implementation. This paper will do this by focusing on the following points: (1) RBSP is the first full-up implementation of earned value management (EVM) at JHU/APL; (2) RBSP EVM started in Phase B; (3) RBSP EVM implementation has been working well in Phase C/D; (4) RBSP EVM implementation has been recognized by Goddard Space Flight Center and NASA Headquarters as successful; and (5) an assessment of the benefits of EVMS to the project management team and sponsor shows that the system's benefits outweigh the cost of implementation.

  6. Concise solid-phase synthesis of inverse poly(amidoamine) dendrons using AB2 building blocks.

    PubMed

    Huang, Adela Ya-Ting; Tsai, Ching-Hua; Chen, Hsing-Yin; Chen, Hui-Ting; Lu, Chi-Yu; Lin, Yu-Ting; Kao, Chai-Lin

    2013-06-28

    A concise solid-phase synthesis of inverse poly(amidoamine) dendrons was developed. Upon introduction of AB2-type monomers, each dendron generation was constructed via one reaction. G2 to G5 dendrons were constructed in a peptide synthesizer in 93%, 89%, 82%, and 78% yields, respectively, within 5 days.

  7. Investigating Students' Mental Models and Knowledge Construction of Microscopic Friction. I. Implications for Curriculum Design and Development

    ERIC Educational Resources Information Center

    Corpuz, Edgar D.; Rebello, N. Sanjay

    2011-01-01

    In this paper, we discuss the first phase of a multiphase study aimed at investigating the dynamics of students' knowledge construction in the context of unfamiliar physical phenomenon--microscopic friction. The first phase of this study involved the investigation of the variations in students' mental models of microscopic friction. Clinical…

  8. Multidimensional Trellis Coded Phase Modulation Using a Multilevel Concatenation Approach. Part 1; Code Design

    NASA Technical Reports Server (NTRS)

    Rajpal, Sandeep; Rhee, Do Jun; Lin, Shu

    1997-01-01

    The first part of this paper presents a simple and systematic technique for constructing multidimensional M-ary phase shift keying (MMK) trellis coded modulation (TCM) codes. The construction is based on a multilevel concatenation approach in which binary convolutional codes with good free branch distances are used as the outer codes and block MPSK modulation codes are used as the inner codes (or the signal spaces). Conditions on phase invariance of these codes are derived and a multistage decoding scheme for these codes is proposed. The proposed technique can be used to construct good codes for both the additive white Gaussian noise (AWGN) and fading channels as is shown in the second part of this paper.

  9. Programming in a proposed 9X distributed Ada

    NASA Technical Reports Server (NTRS)

    Waldrop, Raymond S.; Volz, Richard A.; Goldsack, Stephen J.; Holzbach-Valero, A. A.

    1991-01-01

    The studies of the proposed Ada 9X constructs for distribution, now referred to as AdaPT are reported. The goals for this time period were to revise the chosen example scenario and to begin studying about how the proposed constructs might be implemented. The example scenario chosen is the Submarine Combat Information Center (CIC) developed by IBM for the Navy. The specification provided by IBM was preliminary and had several deficiencies. To address these problems, some changes to the scenario specification were made. Some of the more important changes include: (1) addition of a system database management function; (2) addition of a fourth processing unit to the standard resources; (3) addition of an operator console interface function; and (4) removal of the time synchronization function. To implement the CIC scenario in AdaPT, the decided strategy were publics, partitions, and nodes. The principle purpose for implementing the CIC scenario was to demonstrate how the AdaPT constructs interact with the program structure. While considering ways that the AdaPt constructs might be translated to Ada 83, it was observed that the partition construct could reasonably be modeled as an abstract data type. Although this gives a useful method of modeling partitions, it does not at all address the configuration aspects on the node construct.

  10. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  11. Implementation of warranties in state contracts for highway construction : tech summary.

    DOT National Transportation Integrated Search

    2012-04-01

    In 1997, The Louisiana House of Representatives passed Bill Number 1698, which addresses warranties in state contracts : for highway construction. This bill states that every contract for the construction of or improvements to highways will : include...

  12. Numerical analysis of orbital transfers to Mars using solar sails and attitude control

    NASA Astrophysics Data System (ADS)

    Pereira, M. C.; de Melo, C. F.; Meireles, L. G.

    2017-10-01

    Solar sails present a promising alternative method of propulsion for the coming phases of the space exploration. With the recent advances in materials engineering, the construction of lighter and more resistant materials capable of impelling spaceships with the use of solar radiation pressure has become increasingly viable technologically and economically. The studies, simulations and analysis of orbital transfers from Earth to Mars proposed in this work were implemented considering the use of a flat solar sail. Maneuvers considering the delivery of a sailcraft from a Low Earth Orbit to the border of the Earth’s sphere of influence and interplanetary trajectories to Mars were investigated. A set of simulations were implemented varying the attitude of the sail relative to the Sun. Results show that a sailcraft can carry out transfers with final velocity with respect to Mars smaller than the interplanetary Patched-conic approximation, although this requires a longer time of transfers, provided the attitude of the sailcraft relative to the Sun can be controlled in some points of the trajectories.

  13. 77 FR 35862 - Approval and Promulgation of Implementation Plans; State of Florida: New Source; Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Resource Management, to EPA in two separate SIP revisions on October 19, 2007, and July 1, 2011. These SIP...) Implementation Rule NSR Update Phase II (hereafter referred to as the ``Ozone Implementation NSR Update'' or ``Phase II Rule'') recognizing nitrogen oxide (NO X ) as an ozone precursor, among other requirements. In...

  14. Evaluation criteria for district health management information systems: lessons from the Ministry of Health, Kenya.

    PubMed

    Odhiambo-Otieno, George W

    2005-01-01

    There has been no comprehensive evaluation of the district health management information systems (DHMISs) since the establishment of these systems by the Ministry of Health (MoH), in Kenya. This is partly due to lack of defined criteria for evaluating the systems. The objective of this study is to design evaluation criteria for assessing the viability, sustainability and ultimate contribution of DHMIS in the management of the district health system (DHS) in Kenya. This descriptive cross-sectional study was undertaken in three DHSs in Kenya. Empirical evidence was collected through interviews, complemented by a comprehensive review of relevant literature, reports and operational manuals of various health information systems in Kenya. A set of evaluation criteria for DHMISs in Kenya was designed for each of the three phases of implementation: phase one-pre-implementation evaluation criteria (categorized as policy and objectives, technical feasibility, financial viability, political viability and administrative operability) to be applied at the design stage; phase two-concurrent (operational) implementation evaluation criteria to be applied during implementation of the new system; phase three-post-implementation evaluation criteria (classified as internal-quality of information; external-resources and managerial support; ultimate-systems impact) to be applied after operating the implemented system for at least 3 years. In designing a DHMIS model there is need to have built-in these three sets of evaluation criteria which should be used in a phased manner. Pre-implementation evaluation criteria should be used to evaluate the system's viability before more resources are committed to its implementation; concurrent (operational) implementation evaluation criteria should be used to ascertain the status of the on-going implementation with the view to either fine-tune or abandon it altogether before more resources are used on it; and post-implementation evaluation criteria should be used to assess its overall effectiveness (if it has achieved its hypothesized benefits) towards the management of DHS.

  15. Numerical and Experimental Analysis on Inorganic Phase Change Material Usage in Construction

    NASA Astrophysics Data System (ADS)

    Muthuvel, S.; Saravanasankar, S.; Sudhakarapandian, R.; Muthukannan, M.

    2014-12-01

    This work demonstrates the significance of Phase Change Material (PCM) in the construction of working sheds and product storage magazines in fireworks industries to maintain less temperature variation by passive cooling. The inorganic PCM, namely Calcium Chloride Hexahydrate (CCH) is selected in this study. First, the performance of two models with inbuilt CCH was analysed, using computational fluid dynamics. A significant change in the variation of inner wall temperature was observed, particularly during the working hours. This is mainly due to passive cooling, where the heat transfer from the surroundings to the room is partially used for the phase change from solid to liquid. The experiment was carried out by constructing two models, one with PCM packed in hollow brick walls and roof, and the other one as a conventional construction. The experimental results show that the temperature of the room got significantly reduced up to 7 °C. The experimental analysis results had good agreement with the numerical analysis results, and this reveals the advantage of the PCM in the fireworks industry construction.

  16. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  17. Research Implementation.

    ERIC Educational Resources Information Center

    Trochim, William M. K.

    Investigated is the topic of research implementation and how it can affect evaluation results. Even when evaluations are well planned, the obtained results can be misleading if the conscientiously-constructed research plan is not correctly implemented in practice. In virtually every research arena, one finds major difficulties in implementing the…

  18. A Human Systems Integration Approach to Energy Efficiency in Ground Transportation

    DTIC Science & Technology

    2015-12-01

    Granite Construction Organizational Structure .........................................53 Figure 7. A Comparison of USMC Structure to Granite Construction...Caterpillar Corporation and the implementation and use of their telematics systems within a company called Granite Construction. Granite Construction...profit over 250 million dollars annually. In addition, similar to the USMC, Granite Construction handles both large and small scale projects in a

  19. Geophysical methods for road construction and maintenance

    NASA Astrophysics Data System (ADS)

    Rasul, Hedi; Karlson, Caroline; Jamali, Imran; Earon, Robert; Olofsson, Bo

    2015-04-01

    Infrastructure, such as road transportation, is a vital in civilized societies; which need to be constructed and maintained regularly. A large part of the project cost is attributed to subsurface conditions, where unsatisfactory conditions could increase either the geotechnical stabilization measures needed or the design cost itself. A way to collect information of the subsurface and existing installations which can lead to measures reducing the project cost and damage is to use geophysical methods during planning, construction and maintenance phases. The moisture in road layers is an important factor, which will affect the bearing capacity of the construction as well as the maintenances. Moisture in the road is a key factor for a well-functioning road. On the other hand the excessive moisture is the main reason of road failure and problems. From a hydrological point of view geophysical methods could help road planners identify the water table, geological strata, pollution arising from the road and the movement of the pollution before, during and after construction. Geophysical methods also allow road planners to collect valuable data for a large area without intrusive investigations such as with boreholes, i.e. minimizing the environmental stresses and costs. However, it is important to specify the investigation site and to choose the most appropriate geophysical method based on the site chosen and the objective of the investigation. Currently, numerous construction and rehabilitation projects are taking places around the world. Many of these projects are focused on infrastructural development, comprising both new projects and expansion of the existing infrastructural network. Geophysical methods can benefit these projects greatly during all phases. During the construction phase Ground Penetrating radar (GPR) is very useful in combination with Electrical Resistivity (ER) for detecting soil water content and base course compaction. However, ER and Electromagnetic (EM) methods can also be used for monitoring changes in water content and pollutant spreading during the maintenance phase. The objective of this study was to describe various geophysical methods which could benefit the road planning, construction and maintenance phases focusing on hydrological impacts.

  20. Model-based phase-shifting interferometer

    NASA Astrophysics Data System (ADS)

    Liu, Dong; Zhang, Lei; Shi, Tu; Yang, Yongying; Chong, Shiyao; Miao, Liang; Huang, Wei; Shen, Yibing; Bai, Jian

    2015-10-01

    A model-based phase-shifting interferometer (MPI) is developed, in which a novel calculation technique is proposed instead of the traditional complicated system structure, to achieve versatile, high precision and quantitative surface tests. In the MPI, the partial null lens (PNL) is employed to implement the non-null test. With some alternative PNLs, similar as the transmission spheres in ZYGO interferometers, the MPI provides a flexible test for general spherical and aspherical surfaces. Based on modern computer modeling technique, a reverse iterative optimizing construction (ROR) method is employed for the retrace error correction of non-null test, as well as figure error reconstruction. A self-compiled ray-tracing program is set up for the accurate system modeling and reverse ray tracing. The surface figure error then can be easily extracted from the wavefront data in forms of Zernike polynomials by the ROR method. Experiments of the spherical and aspherical tests are presented to validate the flexibility and accuracy. The test results are compared with those of Zygo interferometer (null tests), which demonstrates the high accuracy of the MPI. With such accuracy and flexibility, the MPI would possess large potential in modern optical shop testing.

Top