Sample records for construction management based

  1. 48 CFR 915.404-4-71-6 - Fee base.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...

  2. Applying Sensor-Based Technology to Improve Construction Safety Management.

    PubMed

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  3. Applying Sensor-Based Technology to Improve Construction Safety Management

    PubMed Central

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-01-01

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions. PMID:28800061

  4. Internet-based Interactive Construction Management Learning System.

    ERIC Educational Resources Information Center

    Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy

    2001-01-01

    Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…

  5. [Medication error management climate and perception for system use according to construction of medication error prevention system].

    PubMed

    Kim, Myoung Soo

    2012-08-01

    The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

  6. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  7. Model Configuration and Innovative Design of College Students’ Ecological Civilization Construction

    NASA Astrophysics Data System (ADS)

    Chengwen, Yang

    2018-02-01

    This study is based on Marxist eco-civilization thought, combining with Eco management theory, puts forward solutions for college students’ ecological civilization construction. The paper based on the perspective of ecological management theory to analyze the main elements of eco-civilization construction of college students, mainly including five categories. In view of above-mentioned analyze, constructed the model of college students’ eco-civilization which is based on the theory of eco-management, and put forward on concrete methods to improve it.

  8. Enhancing Knowledge Sharing Management Using BIM Technology in Construction

    PubMed Central

    Ho, Shih-Ping; Tserng, Hui-Ping

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790

  9. Enhancing knowledge sharing management using BIM technology in construction.

    PubMed

    Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.

  10. Healthcare managers' construction of the manager role in relation to the medical profession.

    PubMed

    von Knorring, Mia; Alexanderson, Kristina; Eliasson, Miriam A

    2016-05-16

    Purpose - The purpose of this paper is to explore how healthcare managers construct the manager role in relation to the medical profession in their organisations. Design/methodology/approach - In total, 18 of Sweden's 20 healthcare chief executive officers (CEOs) and 20 clinical department managers (CDMs) were interviewed about their views on management of physicians. Interviews were performed in the context of one aspect of healthcare management; i.e., management of physicians' sickness certification practice. A discourse analysis approach was used for data analysis. Findings - Few managers used a management-based discourse to construct the manager role. Instead, a profession-based discourse dominated and managers frequently used the attributes "physician" or "non-physician" to categorise themselves or other managers in their managerial roles. Some managers, both CEOs and CDMs, shifted between the management- and profession-based discourses, resulting in a kind of "yes, but […]" approach to management in the organisations. The dominating profession-based discourse served to reproduce the power and status of physicians within the organisation, thereby rendering the manager role weaker than the medical profession for both physician and non-physician managers. Research limitations/implications - Further studies are needed to explore the impact of gender, managerial level, and basic profession on how managers construct the manager role in relation to physicians. Practical implications - The results suggest that there is a need to address the organisational conditions for managers' role taking in healthcare organisations. Originality/value - Despite the general strengthening of the manager position in healthcare through political reforms during the last decades, this study shows that a profession-based discourse clearly dominated in how the managers constructed the manager role in relation to the medical profession on the workplace level in their organisations.

  11. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  12. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  13. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  14. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  15. CSHM: Web-based safety and health monitoring system for construction management.

    PubMed

    Cheung, Sai On; Cheung, Kevin K W; Suen, Henry C H

    2004-01-01

    This paper describes a web-based system for monitoring and assessing construction safety and health performance, entitled the Construction Safety and Health Monitoring (CSHM) system. The design and development of CSHM is an integration of internet and database systems, with the intent to create a total automated safety and health management tool. A list of safety and health performance parameters was devised for the management of safety and health in construction. A conceptual framework of the four key components of CSHM is presented: (a) Web-based Interface (templates); (b) Knowledge Base; (c) Output Data; and (d) Benchmark Group. The combined effect of these components results in a system that enables speedy performance assessment of safety and health activities on construction sites. With the CSHM's built-in functions, important management decisions can theoretically be made and corrective actions can be taken before potential hazards turn into fatal or injurious occupational accidents. As such, the CSHM system will accelerate the monitoring and assessing of performance safety and health management tasks.

  16. Protocol for a mixed-methods study on leader-based interventions in construction contractors' safety commitments.

    PubMed

    Pedersen, Betina Holbaek; Dyreborg, Johnny; Kines, Pete; Mikkelsen, Kim Lyngby; Hannerz, Harald; Andersen, Dorte Raaby; Spangenberg, Søren

    2010-06-01

    Owing to high injury rates, safety interventions are needed in the construction industry. Evidence-based interventions tailored to this industry are, however, scarce. Leader-based safety interventions have proven more effective than worker-based interventions in other industries. To test a leader-based safety intervention for construction sites. The intervention consists of encouraging safety coordinators to provide feedback on work safety to the client and line management. The intention is to increase communication and interactions regarding safety within the line management and between the client and the senior management. It is hypothesised that this, in turn, will lead to increased communication and interaction about safety between management and coworkers as well as an increased on-site safety level. A group-randomised double-blinded case study of six Danish construction sites (three intervention sites and three control sites). The recruitment of the construction sites is performed continuously from January 2010 to June 2010. The investigation of each site lasts 20 continuous weeks. Confirmatory statistical analysis is used to test if the safety level increased, and if the probability of safety communications between management and coworkers increases as a consequence of the intervention. The data collection will be blinded. Qualitative methods are used to evaluate if communication and interactions about safety at all managerial levels, including the client, increase. (1) The proportion of safety-related communications out of all studied communications between management and coworkers. (2) The safety level index of the construction sites.

  17. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    PubMed

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    NASA Astrophysics Data System (ADS)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  19. A Model of Solid Waste Management Based Multilateral Co-Operation in Semi-Urban Community

    ERIC Educational Resources Information Center

    Kanchanabhandhu, Chanchai; Woraphong, Seree

    2016-01-01

    The purpose of this research was to construct a model of solid waste management based on multilateral cooperation in semi-urban community. Its specific objectives were to 1) study the solid waste situation and involvement of community in the solid waste management in Wangtaku Sub-district, Muang District, Nakhon Pathom Province; 2) construct a…

  20. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  1. Design and application of BIM based digital sand table for construction management

    NASA Astrophysics Data System (ADS)

    Fuquan, JI; Jianqiang, LI; Weijia, LIU

    2018-05-01

    This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.

  2. Development of a validation process for parameters utilized in optimizing construction quality management of pavements.

    DOT National Transportation Integrated Search

    2006-01-01

    The implementation of an effective performance-based construction quality management requires a tool for determining impacts of construction quality on the life-cycle performance of pavements. This report presents an update on the efforts in the deve...

  3. Higher Education Change and Its Managers: Alternative Constructions

    ERIC Educational Resources Information Center

    Hotho, Sabine

    2013-01-01

    This article is based on a case study conducted in the context of UK higher education change. The article argues that "change" is a construct created in discourses of change policy and change management, and resulting in reductivist change management discourses which may impede rather than facilitate effective change management in the…

  4. VHBuild.com: A Web-Based System for Managing Knowledge in Projects.

    ERIC Educational Resources Information Center

    Li, Heng; Tang, Sandy; Man, K. F.; Love, Peter E. D.

    2002-01-01

    Describes an intelligent Web-based construction project management system called VHBuild.com which integrates project management, knowledge management, and artificial intelligence technologies. Highlights include an information flow model; time-cost optimization based on genetic algorithms; rule-based drawing interpretation; and a case-based…

  5. Simulation-based modeling of building complexes construction management

    NASA Astrophysics Data System (ADS)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  6. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  7. The concept of value stream mapping to reduce of work-time waste as applied the smart construction management

    NASA Astrophysics Data System (ADS)

    Elizar, Suripin, Wibowo, Mochamad Agung

    2017-11-01

    Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.

  8. [Meanings attributed to management as an explanation for clinician managers' attitudes and professional identity].

    PubMed

    Cascón-Pereira, Rosalía; Valverde, Mireia

    2014-01-01

    To understand the process by which clinician managers construct their professional identities and develop their attitudes toward managing. A qualitative study was performed, based on grounded theory, through in-depth interviews with 20 clinician managers selected through theoretical sampling in two public hospitals of Catalonia (Spain), participant observation, and documentation. Clinician managers' role meanings are constructed by comparing their roles with those of senior managers and clinicians. In this process, clinician managers seek to differentiate themselves from senior managers through the meanings constructed. In particular, they use proximity with reality and clinical knowledge as the main sources of differentiation. This study sheds light on why clinician managers develop adverse attitudes to managing and why they define themselves as clinicians rather than as managers. The explanation lies in the construction of the meanings they assign to managing as the basis of their attitudes to this role and professional identity. These findings have some practical implications for healthcare management. Copyright © 2014. Published by Elsevier Espana.

  9. Foundations of Constructing a Marketing Data Base; Profitable Applications of the Computer to Marketing Management.

    ERIC Educational Resources Information Center

    Podell, Harold J.

    An introduction into the foundations of constructing a marketing data base is presented for the systems and marketing executives who are familiar with basic computer technology methods. The techniques and concepts presented are now being implemented by major organizations in the development of Management Information Systems (MIS). A marketing data…

  10. Application of BIM technology in green building material management system

    NASA Astrophysics Data System (ADS)

    Zhineng, Tong

    2018-06-01

    The current green building materials management system in China's construction industry is not perfect, and there are still many shortcomings. Active construction of green building materials management system based on BIM technology, combined with the characteristics of green building materials and its relationship with BIM technology application, is urgently needed to better realize the scientific management of green building materials.

  11. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    NASA Astrophysics Data System (ADS)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  12. Constraints to 3R construction waste reduction among contractors in Penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2018-04-01

    Rapid development of construction industry increases construction waste on landfill leading to shorter life span of the landfill. Waste reduction through Reduce, Reuse and Recycle (3R) practice has been encouraged in construction industry towards sustainable waste management since couple of decades ago. However, waste reduction through 3R is still at its infancy in construction industry in Penang, Malaysia. The aim of this paper is to determinate the constraints to construction waste reduction through 3R among contractors in Penang. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 based in Penang, experts from Penang Local Authority, CIDB in Penang and its headquarters, National Solid Waste Management Department, and headquarters of Solid Waste and Public Cleansing Management Corporation (SWCorp). Based on interviews and questionnaire surveys, constraints identified are Time and cost, Contractor’s attitude and low participation, Lack of enforcement law and regulation, Lack of awareness and knowledge, Lack of coordination, and Lack of space. Awareness and knowledge, and enforcement law and regulation are the major barriers which influence others constraints as well. Therefore, these constraints should be emphasized by the authorities in order to improve the implementation of 3R construction waste reduction.

  13. Lunar and Planetary Bases, Habitats, and Colonies

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This special bibliography includes the design and construction of lunar and Mars bases, habitats, and settlements; construction materials and equipment; life support systems; base operations and logistics; thermal management and power systems; and robotic systems.

  14. Constructing Proxy Variables to Measure Adult Learners' Time Management Strategies in LMS

    ERIC Educational Resources Information Center

    Jo, Il-Hyun; Kim, Dongho; Yoon, Meehyun

    2015-01-01

    This study describes the process of constructing proxy variables from recorded log data within a Learning Management System (LMS), which represents adult learners' time management strategies in an online course. Based on previous research, three variables of total login time, login frequency, and regularity of login interval were selected as…

  15. 51. Roof plans, General Services Administration, Construction Management Division, Region ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  16. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  17. Case Study on Project Risk Management Planning Based on Soft System Methodology

    NASA Astrophysics Data System (ADS)

    Lifang, Xie; Jun, Li

    This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.

  18. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  19. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  20. A simulation model of hospital management based on cost accounting analysis according to disease.

    PubMed

    Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki

    2004-12-01

    Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.

  1. Constructing counterproductive behavior for supporting evironmental management system research

    NASA Astrophysics Data System (ADS)

    Tiarapuspa; Indyastuti, D. L.; Sari, W. R.

    2018-01-01

    This study aims to explore the definition of counterproductive behavior based on supervisors’ and sub ordinaries’ perceptions. Recently, environmental management system is a strategic tool to gain a competitive advantage. Human resource is the vital factor for successful environmental management system. Counterproductive behavior will destroy environmental management system. Unfortunately, the construct of counterproductive behavior is still debatable. Different culture show different dimensions and indicators of counterproductive behavior. The unclear construct results ambiguous empirical evidence. This study results that many items are included of counterproductive behavior, such as come late, impolite communication, playing gadget in working time, and the other negative behaviors.

  2. A Research on the Construction of University R&D Management Team in China

    ERIC Educational Resources Information Center

    Jia, Ning

    2007-01-01

    The system of Chinese universities R&D as a branch of the system of the whole country R&D, has a great effect on the development and innovation of the country's science and technique. Consequently, it's important to construct an effective management team with high diathesis for University R&D management. Based on the statistics of the…

  3. Elementary Introduction to the Green Management of the Construction in Whole Process

    NASA Astrophysics Data System (ADS)

    Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi

    Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.

  4. Routines for change: how managers can use absorptive capacity to adopt and implement evidence-based practice.

    PubMed

    Innis, Jennifer; Berta, Whitney

    2016-09-01

    This paper uses the construct of absorptive capacity to understand how nurse managers can facilitate the adoption and use of evidence-based practice within health-care organisations. How health-care organisations adopt and implement innovations such as new evidence-based practices will depend on their absorptive, or learning, capacity. Absorptive capacity manifests as routines, which are the practices, procedures and customs that organisational members use to carry out work and to make work-related decisions. Using the construct of absorptive capacity as well as a recent literature review of how health-care organisations take on best practices, we illustrate how the uptake and use of new knowledge, such as evidence-based practices, can be facilitated through the use of routines. This paper highlights routines that nurse managers can use to foster environments where evidence-based practices can be readily identified, and strategies for facilitating their adoption and implementation. The construct of absorptive capacity and the use of routines can be used to examine the ways in which nurse managers can adopt, implement and evaluate the use of evidence-based practices. © 2016 John Wiley & Sons Ltd.

  5. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach.

    PubMed

    Bai, Libiao; Wang, Hailing; Huang, Ning; Du, Qiang; Huang, Youdan

    2018-06-23

    The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP) based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP) environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP)-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  6. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    NASA Astrophysics Data System (ADS)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  7. Prediction of the properties anhydrite construction mixtures based on neural network approach

    NASA Astrophysics Data System (ADS)

    Fedorchuk, Y. M.; Zamyatin, N. V.; Smirnov, G. V.; Rusina, O. N.; Sadenova, M. A.

    2017-08-01

    The article considered the question of applying the backstop modeling mechanism from the components of anhydride mixtures in the process of managing the technological processes of receiving construction products which based on fluoranhydrite.

  8. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System

    PubMed Central

    Andújar-Montoya, María Dolores

    2017-01-01

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693

  9. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System.

    PubMed

    Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio

    2017-07-22

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.

  10. Advanced construction management for lunar base construction - Surface operations planner

    NASA Technical Reports Server (NTRS)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  11. Estimation of construction waste generation and management in Thailand.

    PubMed

    Kofoworola, Oyeshola Femi; Gheewala, Shabbir H

    2009-02-01

    This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.

  12. Giving patients responsibility or fostering mutual response-ability: family physicians' constructions of effective chronic illness management.

    PubMed

    Thille, Patricia H; Russell, Grant M

    2010-10-01

    Current visions of family medicine and models of chronic illness management integrate evidence-based medicine with collaborative, patient-centered care, despite critiques that these constructs conflict with each other. With this potential conflict in mind, we applied a critical discursive psychology methodology to present discursive patterns articulated by 13 family physicians in Ontario, Canada, regarding care of patients living with multiple chronic illnesses. Physicians constructed competing versions of the terms "effective chronic illness management" and "patient involvement." One construction integrated individual responsibility for health with primacy of "evidence," resulting in a conceptualization consistent with paternalistic care. The second constructed effective care as involving active partnership of physician and patient, implying a need to foster the ability of both practitioners and patients to respond to complex challenges as they arose. The former pattern is inconsistent with visions of family medicine and chronic illness management, whereas the latter embodies it.

  13. Development of a construction engineering manpower system for Georgia DOT.

    DOT National Transportation Integrated Search

    1994-07-01

    The objective of this special research study was to develop a construction engineering manpower management system based primarily on construction dollars and to determine if this type of system will be adequate for the GDOT.

  14. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  15. Discursive construction of polyphony in healthcare management.

    PubMed

    Hujala, Anneli; Rissanen, Sari

    2012-01-01

    The aim of the paper is to understand and define how the polyphony of management is constructed in interaction and to describe this through concrete management meeting cases. Polyphony refers to the diverse voices of various organization members, and how these voices are present, disclosed and utilized in management. The study is based on the social constructionist and discursive perspectives of management, which question the traditional, individualistic approaches of management. The issue was examined through a qualitative case study by analysing the micro-level management discourse in three healthcare organizations. Discursive practices that enhance or inhibit polyphony are often unnoticed and unconscious. Key moments of management discourse are an example of unconscious mundane practices through which members of organizations construct the reality of management. The empirical results are locally contextual. In the future, research will be able to apply the approach to diverse contexts as well as link micro-level discourses to the construction of broader health and social management discourses. The paper increases the understanding of how to enhance participation and staff contribution, and how to utilize the knowledge of all members of the organization. Both managers and other staff members are fully involved in the social construction of management. Micro-level discourse should be paid attention to in management work as well as in the education of managers and staff. The study increases the understanding of micro-level issues of management and challenges the conventional, taken-for-granted assumptions behind organization and management theories.

  16. Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research.

    PubMed

    Rowlinson, Steve; Yunyanjia, Andrea; Li, Baizhan; Chuanjingju, Carrie

    2014-05-01

    Climatic heat stress leads to accidents on construction sites brought about by a range of human factors emanating from heat induced illness, and fatigue leading to impaired capability, physical and mental. It is an occupational characteristic of construction work in many climates and the authors take the approach of re-engineering the whole safety management system rather than focusing on incremental improvement, which is current management practice in the construction industry. From a scientific viewpoint, climatic heat stress is determined by six key factors: (1) air temperature, (2) humidity, (3) radiant heat, and (4) wind speed indicating the environment, (5) metabolic heat generated by physical activities, and (6) "clothing effect" that moderates the heat exchange between the body and the environment. By making use of existing heat stress indices and heat stress management processes, heat stress risk on construction sites can be managed in three ways: (1) control of environmental heat stress exposure through use of an action-triggering threshold system, (2) control of continuous work time (CWT, referred by maximum allowable exposure duration) with mandatory work-rest regimens, and (3) enabling self-paced working through empowerment of employees. Existing heat stress practices and methodologies are critically reviewed and the authors propose a three-level methodology for an action-triggering, localized, simplified threshold system to facilitate effective decisions by frontline supervisors. The authors point out the need for "regional based" heat stress management practices that reflect unique climatic conditions, working practices and acclimatization propensity by local workers indifferent geographic regions. The authors set out the case for regional, rather than international, standards that account for this uniqueness and which are derived from site-based rather than laboratory-based research. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. VISION-BASED MONITORING AND CONTROL OF CONSTRUCTION OPERATIONS CARBON FOOTPRINT

    EPA Science Inventory

    Automated and continuous carbon footprint monitoring of construction operations support the contractors and project managers with information required for assessment on carbon footprint of various construction operation alternatives. This can ultimately lead to reduction of...

  18. Construction and application research of Three-dimensional digital power grid in Southwest China

    NASA Astrophysics Data System (ADS)

    Zhou, Yang; Zhou, Hong; You, Chuan; Jiang, Li; Xin, Weidong

    2018-01-01

    With the rapid development of Three-dimensional (3D) digital design technology in the field of power grid construction, the data foundation and technical means of 3D digital power grid construction approaches perfection. 3D digital power grid has gradually developed into an important part of power grid construction and management. In view of the complicated geological conditions in Southwest China and the difficulty in power grid construction and management, this paper is based on the data assets of Southwest power grid, and it aims at establishing a 3D digital power grid in Southwest China to provide effective support for power grid construction and operation management. This paper discusses the data architecture, technical architecture and system design and implementation process of the 3D digital power grid construction through teasing the key technology of 3D digital power grid. The application of power grid data assets management, transmission line corridor planning, geological hazards risk assessment, environmental impact assessment in 3D digital power grid are also discussed and analysed.

  19. Research of Manufacture Time Management System Based on PLM

    NASA Astrophysics Data System (ADS)

    Jing, Ni; Juan, Zhu; Liangwei, Zhong

    This system is targeted by enterprises manufacturing machine shop, analyzes their business needs and builds the plant management information system of Manufacture time and Manufacture time information management. for manufacturing process Combined with WEB technology, based on EXCEL VBA development of methods, constructs a hybrid model based on PLM workshop Manufacture time management information system framework, discusses the functionality of the system architecture, database structure.

  20. Discussion on the management system technology implementation of multimedia classrooms in the digital campus

    NASA Astrophysics Data System (ADS)

    Wang, Bo

    2018-04-01

    Based on the digitized information and network, digital campus is an integration of teaching, management, science and research, life service and technology service, and it is one of the current mainstream construction form of campus function. This paper regarded the "mobile computing" core digital environment construction development as the background, explored the multiple management system technology content design and achievement of multimedia classrooms in digital campus and scientifically proved the technology superiority of management system.

  1. Study and practice in the construction of open physical experiments teaching system

    NASA Astrophysics Data System (ADS)

    Xu, Yan

    2017-09-01

    Based on open physical experiments teaching system put forward by Ministry of Education, HHU(Hohai University) has carried out the construction of open experimental manage system, which includes course selecting system, teaching system, manage system and information desk. The innovation is in order to mobilize the students’ learning autonomy, cultivate the students’ creative ability and improve teaching quality. Besides, it achieves direct management from school to college to the laboratory and traced manage to the working device regardless of distance and time.

  2. Information Systems for University Planning.

    ERIC Educational Resources Information Center

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  3. Processes in construction of failure management expert systems from device design information

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  4. Construction of a Conceptualization of Personal Knowledge within a Knowledge Management Perspective Using Grounded Theory Methodology

    ERIC Educational Resources Information Center

    Straw, Eric M.

    2013-01-01

    The current research used grounded theory methodology (GTM) to construct a conceptualization of personal knowledge within a knowledge management (KM) perspective. The need for the current research was based on the use of just two categories of knowledge, explicit and tacit, within KM literature to explain diverse characteristics of personal…

  5. Building a Construction Procurement Negotiation Training Game Model: Learning Experiences and Outcomes

    ERIC Educational Resources Information Center

    Dzeng, Ren-Jye; Lin, Ken-Yu; Wang, Pei-Ru

    2014-01-01

    Game-based education is a promising method for encouraging student learning. Although learning construction procurement and negotiation require hands-on practice, in most construction management courses at the college level, this subject is taught by using lectures and case studies. In this study, a construction procurement and negotiation game…

  6. [Innovation drive is the original motive force of discipline construction: the developing road of Department of Burns and Plastic Surgery in the 309th Hospital of PLA].

    PubMed

    Jia, C Y

    2018-03-20

    Discipline construction is a systematic project, covering clinic, teaching, scientific research, management, and humanity. Based on the perspective of innovation drive, from the aspects of discipline structure setting, specialized laboratory construction, sub-specialty formation, clinical characteristic and advantage formation, and management concept update, this article summarizes the growth process of Department of Burns and Plastic Surgery in the 309th Hospital of PLA.

  7. The peculiarities of process-based approach realization in transport sector company management

    NASA Astrophysics Data System (ADS)

    Khripko, Elena; Sidorov, Gennadiy

    2017-10-01

    In the present article we study the phenomena of multiple meaning in understanding process-based management method in construction of transport infrastructure facilities. The idea of multiple meaning is in distortions which appear during reception of the management process paradigm in organizational environment of transport sector. The cause of distortion in process management is organizational resistance. The distortions of management processes are discovered at the level of diffusion among spheres of responsibility, collision in forms of functional, project and process interaction between the owner of the process and its participants. The level of distortion is affected by the attitude towards the result of work which means that process understanding of the result is replaced by the functional one in practice of management. This transfiguration is the consequence of regressive defensive mechanisms of the organizational environment. On the base of experience of forming process management in construction of transport infrastructure facilities company of the issues of diagnostics of various forms of organizational resistance and ways of reducing the destructive influence on managing processes are reviewed.

  8. The Challenge of Space Infrastructure Construction

    NASA Technical Reports Server (NTRS)

    Howe, A. Scott; Colombano, Silvano P.

    2010-01-01

    This paper reviews the range of technologies that will contribute to the construction of space infrastructure that will both enable and, in some cases, provide the motivation for space exploration. Five parts are addressed: Managing complexity, robotics based construction, materials acquisition, manufacturing, and self-sustaining systems.

  9. Service Discovery Oriented Management System Construction Method

    NASA Astrophysics Data System (ADS)

    Li, Huawei; Ren, Ying

    2017-10-01

    In order to solve the problem that there is no uniform method for design service quality management system in large-scale complex service environment, this paper proposes a distributed service-oriented discovery management system construction method. Three measurement functions are proposed to compute nearest neighbor user similarity at different levels. At present in view of the low efficiency of service quality management systems, three solutions are proposed to improve the efficiency of the system. Finally, the key technologies of distributed service quality management system based on service discovery are summarized through the factor addition and subtraction of quantitative experiment.

  10. Developing a Behavioral Model for Mobile Phone-Based Diabetes Interventions

    PubMed Central

    Nundy, Shantanu; Dick, Jonathan J.; Solomon, Marla C.; Peek, Monica E.

    2013-01-01

    Objectives Behavioral models for mobile phone-based diabetes interventions are lacking. This study explores the potential mechanisms by which a text message-based diabetes program affected self-management among African-Americans. Methods We conducted in-depth, individual interviews among 18 African-American patients with type 2 diabetes who completed a 4-week text message-based diabetes program. Each interview was audio- taped, transcribed verbatim, and imported into Atlas.ti software. Coding was done iteratively. Emergent themes were mapped onto existing behavioral constructs and then used to develop a novel behavioral model for mobile phone-based diabetes self-management programs. Results The effects of the text message-based program went beyond automated reminders. The constant, daily communications reduced denial of diabetes and reinforced the importance of self-management (Rosenstock Health Belief Model). Responding positively to questions about self-management increased mastery experience (Bandura Self-Efficacy). Most surprisingly, participants perceived the automated program as a “friend” and “support group” that monitored and supported their self-management behaviors (Barrera Social Support). Conclusions A mobile phone-based diabetes program affected self-management through multiple behavioral constructs including health beliefs, self-efficacy, and social support. Practice implications: Disease management programs that utilize mobile technologies should be designed to leverage existing models of behavior change and can address barriers to self-management associated with health disparities. PMID:23063349

  11. Development of a hybrid modeling approach for predicting intensively managed Douglas-fir growth at multiple scales.

    Treesearch

    A. Weiskittel; D. Maguire; R. Monserud

    2007-01-01

    Hybrid models offer the opportunity to improve future growth projections by combining advantages of both empirical and process-based modeling approaches. Hybrid models have been constructed in several regions and their performance relative to a purely empirical approach has varied. A hybrid model was constructed for intensively managed Douglas-fir plantations in the...

  12. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.

    PubMed

    Hu, Wenfa; He, Xinhua

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  13. Environmental Assessment for Vandenberg Gate Complex Construction, Dorm Construction and Demolition at Hanscom Air Force Base, Massachusetts

    DTIC Science & Technology

    2014-12-01

    MA January 2015 3 There are no existing underground stormwater drains in the area of the new Vandenberg Gate Complex. The addition of... stormwater management systems that utilize the pervious landscape, vegetative filtration, sediment removal, infiltration via bioswales, deep sump...Airmen Dormitory construction, a base-wide stormwater standard requires redevelopment projects to reduce stormwater rate and volume by 10% over the

  14. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  15. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    PubMed

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  16. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  17. Quality Improvement of Ground Works Process with the Use of Chosen Lean Management Tools - Case Study

    NASA Astrophysics Data System (ADS)

    Nowotarski, Piotr; Paslawski, Jerzy; Wysocki, Bartosz

    2017-12-01

    Ground works are one of the first processes connected with erecting structures. Based on ground conditions like the type of soil or level of underground water different types and solutions for foundations are designed. Foundations are the base for the buildings, and their proper design and execution is the key for the long and faultless use of the whole construction and might influence on the future costs of the eventual repairs (especially when ground water level is high, and there is no proper water insulation made). Article presents the introduction of chosen Lean Management tools for quality improvement of the process of ground works based on the analysis made on the construction site of vehicle control station located in Poznan, Poland. Processes assessment is made from different perspectives taking into account that 3 main groups of workers were directly involved in the process: blue collar-workers, site manager and site engineers. What is more comparison is made on the 3 points of view to the problems that might occur during this type of works, with details analysis on the causes of such situation? Authors presents also the change of approach of workers directly involved in the mentioned processes regarding introduction of Lean Management methodology, which illustrates the problem of scepticism for new ideas of the people used to perform works and actions in traditional way. Using Lean Management philosophy in construction is a good idea to streamline processes in company, get rid of constantly recurring problems, and in this way improve the productivity and quality of executed activities. Performed analysis showed that different groups of people have very different idea and opinion on the problems connected with executing the same process - ground works and only having full picture of the situation (especially in construction processes) management can take proper problems-preventing actions that consequently can influence on the amount of waste generated on the construction cite which positively influence on the external environment.

  18. LUMIS: Land Use Management and Information Systems; coordinate oriented program documentation

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An integrated geographic information system to assist program managers and planning groups in metropolitan regions is presented. The series of computer software programs and procedures involved in data base construction uses the census DIME file and point-in-polygon architectures. The system is described in two parts: (1) instructions to operators with regard to digitizing and editing procedures, and (2) application of data base construction algorithms to achieve map registration, assure the topological integrity of polygon files, and tabulate land use acreages within administrative districts.

  19. An initial investigation on the challenges of managing construction workforce in Saudi Arabia

    NASA Astrophysics Data System (ADS)

    Al-Emad, N.; Rahman, I. A.

    2017-11-01

    Most of the construction workers in Saudi Arabia are foreigners from several countries having different knowledge, skills and cultures. These create challenges to administer the workers in ensuring project success. This paper presents an initial investigation to uncover the challenges faced by construction professionals in managing construction workforce in Saudi Arabia. It describes insight processes of handling the workforce during planning stage, recruitment procedures and construction stage based on interview with senior manager who are well experienced in handling mega construction projects in Saudi Arabia. The interview was carried out in semi structured mode where the interviewee was given ample time to express the experiences encountered in dealing the workforce issue. This preliminary work able to identify among important issues related to construction workers are restrictions to non-Muslim skilled workers, limited visa quota, being away from family, delay in salary payment, cheating of workers skill’s status, safety issues, communication barriers and living conditions. Hence, these issues require quality leadership attributes such as continuous empathy with workers, respectful, trustful, sincere, reliable, good communication skills and problem solving skills. These findings are useful to construction practitioners and also research work related to construction leadership in handling worker’s issues.

  20. Study on Collaborative SCM of Construction Enterprises Based on Information-Sharing

    NASA Astrophysics Data System (ADS)

    Wang, Lianyue

    Economic globalization and the integration process has led to competition among construction enterprises become increasingly fierce, which are adjusting their development strategies and efforts to seek for the knowledge economy and network environment to promote enterprise survival and development, enhancing the competitiveness of enterprises in the new business management models and ideas. This paper first discussed the concept of the supply chain collaboration of the construction enterprise and constituted a information management platform of the general contracting project. At last, the paper puts forward tactics which aims at helping construction enterprises realize supply chain collaboration and enhance the competitiveness of enterprises.

  1. Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project

    NASA Astrophysics Data System (ADS)

    Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.

    2016-12-01

    Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.

  2. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    PubMed Central

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  3. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    PubMed

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  4. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  5. A generalized strategy for building resident database interfaces

    NASA Technical Reports Server (NTRS)

    Moroh, Marsha; Wanderman, Ken

    1990-01-01

    A strategy for building resident interfaces to host heterogeneous distributed data base management systems is developed. The strategy is used to construct several interfaces. A set of guidelines is developed for users to construct their own interfaces.

  6. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    PubMed Central

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351

  7. Toward Understanding the Role of Web 2.0 Technology in Self-Directed Learning and Job Performance in a Single Organizational Setting: A Qualitative Case Study

    ERIC Educational Resources Information Center

    Caruso, Shirley J.

    2016-01-01

    This single instrumental qualitative case study explores and thickly describes job performance outcomes based upon the manner in which self-directed learning activities of a purposefully selected sample of 3 construction managers are conducted, mediated by the use of Web 2.0 technology. The data collected revealed that construction managers are…

  8. [MATCHE: Management Approach to Teaching Consumer and Homemaking Education.] Occupational Strand: Textiles and Clothing. Module II-D-2: Assembly Line Garment Construction.

    ERIC Educational Resources Information Center

    Henry, Nina

    This competency-based preservice home economics teacher education module on assembly line garment construction is the second in a set of three modules on occupational aspects of textiles and clothing. (This set is part of a larger series of sixty-seven modules on the Management Approach to Teaching Consumer and Homemaking Education [MATCHE]--see…

  9. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  10. Putting into practice error management theory: Unlearning and learning to manage action errors in construction.

    PubMed

    Love, Peter E D; Smith, Jim; Teo, Pauline

    2018-05-01

    Error management theory is drawn upon to examine how a project-based organization, which took the form of a program alliance, was able to change its established error prevention mindset to one that enacted a learning mindfulness that provided an avenue to curtail its action errors. The program alliance was required to unlearn its existing routines and beliefs to accommodate the practices required to embrace error management. As a result of establishing an error management culture the program alliance was able to create a collective mindfulness that nurtured learning and supported innovation. The findings provide a much-needed context to demonstrate the relevance of error management theory to effectively address rework and safety problems in construction projects. The robust theoretical underpinning that is grounded in practice and presented in this paper provides a mechanism to engender learning from errors, which can be utilized by construction organizations to improve the productivity and performance of their projects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  11. Effective factor of virtual team: Resolving communication breakdown in IBS construction project

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.

    2016-08-01

    Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.

  12. The Use of BS7799 Information Security Standard to Construct Mechanisms for the Management of Medical Organization Information Security

    NASA Astrophysics Data System (ADS)

    Liu, Shu-Fan; Chueh, Hao-En; Liao, Kuo-Hsiung

    According to surveys, 80 % of security related events threatening information in medical organizations is due to improper management. Most research on information security has focused on information and security technology, such as network security and access control; rarely addressing issues at the management issues. The main purpose of this study is to construct a BS7799 based mechanism for the management of information with regard to security as it applies to medical organizations. This study analyzes and identifies the most common events related to information security in medical organizations and categorizes these events as high-risk, transferable-risk, and controlled-risk to facilitate the management of such risk.

  13. Communication, coordination and cooperation in construction projects: business environment and human behaviours

    NASA Astrophysics Data System (ADS)

    Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan

    2017-12-01

    The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.

  14. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.

  15. Scenario Based Education as a Framework for Understanding Students Engagement and Learning in a Project Management Simulation Game

    ERIC Educational Resources Information Center

    Misfeldt, Morten

    2015-01-01

    In this paper I describe how students use a project management simulation game based on an attack-defense mechanism where two teams of players compete by challenging each other's projects. The project management simulation game is intended to be played by pre-service construction workers and engineers. The gameplay has two parts: a planning part,…

  16. Designing for psychological change: individuals' reward and cost valuations in weight management.

    PubMed

    Hsu, Anne; Blandford, Ann

    2014-06-26

    Knowledge of the psychological constructs that underlie behavior offers valuable design opportunities for persuasive systems. We use the decision theory, which describes how behavior is underpinned by reward-cost valuations, as a framework for investigating such psychological constructs to deliver design objectives for weight management technologies. We applied a decision theory-based analysis in the domain of weight management to understand the rewards and costs that surround individuals' weight management behaviors, with the aim of uncovering design opportunities for weight management technologies. We conducted qualitative interviews with 15 participants who were or had been trying to lose weight. Thematic analysis was used to extract themes that covered the rewards and costs surrounding weight management behaviors. We supplemented our qualitative study with a quantitative survey of 100 respondents investigating the extent to which they agreed with statements reflecting themes from the qualitative study. The primary obstacles to weight management were the rewards associated with unhealthy choices, such as the pleasures of unhealthy foods and unrestricted consumption in social situations, and the significant efforts required to change habits, plan, and exercise. Psychological constructs that supported positive weight management included feeling good after making healthy choices, being good to oneself, experiencing healthy yet still delicious foods, and receiving social support and encouraging messages (although opinions about encouraging messages was mixed). A rewards-costs driven enquiry revealed a wide range of psychological constructs that contribute to discouraging and supporting weight management. The constructs extracted from our qualitative study were verified by our quantitative survey, in which the majority of respondents also reported similar thoughts and feelings. This understanding of the rewards and costs surrounding weight management offers a range of new opportunities for the design of weight management technologies that enhance the encouraging factors and alleviate the discouraging ones.

  17. The Formation of Professional Identity in French "Apprenti" Managers

    ERIC Educational Resources Information Center

    Angot, Jacques; Malloch, Hedley; Kleymann, Birgit

    2008-01-01

    Purpose: The paper aims to show how professional identity is constructed at a very early stage of initial management education. In so doing, it questions the notion of "le metier" in management. Design/methodology/approach: The paper is based on a study of the experiences of six French management apprentices (or apprentis) who…

  18. Low-carbon building assessment and multi-scale input-output analysis

    NASA Astrophysics Data System (ADS)

    Chen, G. Q.; Chen, H.; Chen, Z. M.; Zhang, Bo; Shao, L.; Guo, S.; Zhou, S. Y.; Jiang, M. M.

    2011-01-01

    Presented as a low-carbon building evaluation framework in this paper are detailed carbon emission account procedures for the life cycle of buildings in terms of nine stages as building construction, fitment, outdoor facility construction, transportation, operation, waste treatment, property management, demolition, and disposal for buildings, supported by integrated carbon intensity databases based on multi-scale input-output analysis, essential for low-carbon planning, procurement and supply chain design, and logistics management.

  19. Application of the predicted heat strain model in development of localized, threshold-based heat stress management guidelines for the construction industry.

    PubMed

    Rowlinson, Steve; Jia, Yunyan Andrea

    2014-04-01

    Existing heat stress risk management guidelines recommended by international standards are not practical for the construction industry which needs site supervision staff to make instant managerial decisions to mitigate heat risks. The ability of the predicted heat strain (PHS) model [ISO 7933 (2004). Ergonomics of the thermal environment analytical determination and interpretation of heat stress using calculation of the predicted heat strain. Geneva: International Standard Organisation] to predict maximum allowable exposure time (D lim) has now enabled development of localized, action-triggering and threshold-based guidelines for implementation by lay frontline staff on construction sites. This article presents a protocol for development of two heat stress management tools by applying the PHS model to its full potential. One of the tools is developed to facilitate managerial decisions on an optimized work-rest regimen for paced work. The other tool is developed to enable workers' self-regulation during self-paced work.

  20. [An anti-Taylor approach: the invention of a method for the cogovernance of health care institutions in order to produce freedom and compromise].

    PubMed

    Campos, G W

    1998-01-01

    This paper describes a new health care management method. A triangular confrontation system was constructed, based on a theoretical review, empirical facts observed from health services, and the researcher's knowledge, jointly analyzed. This new management model was termed 'health-team-focused collegiate management', entailing several original organizational concepts: production unity, matrix-based reference team, collegiate management system, cogovernance, and product/production interface.

  1. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  2. Exploration and implementation of ontology-based cultural relic knowledge map integration platform

    NASA Astrophysics Data System (ADS)

    Yang, Weiqiang; Dong, Yiqiang

    2018-05-01

    To help designers to better carry out creative design and improve the ability of searching traditional cultural relic information, the ontology-based knowledge map construction method was explored and an integrated platform for cultural relic knowledge map was developed. First of all, the construction method of the ontology of cultural relics was put forward, and the construction of the knowledge map of cultural relics was completed based on the constructed cultural relic otology. Then, a personalized semantic retrieval framework for creative design was proposed. Finally, the integrated platform of the knowledge map of cultural relics was designed and realized. The platform was divided into two parts. One was the foreground display system, which was used for designers to search and browse cultural relics. The other was the background management system, which was for cultural experts to manage cultural relics' knowledge. The research results showed that the platform designed could improve the retrieval ability of cultural relic information. To sum up, the platform can provide a good support for the designer's creative design.

  3. Essays on Market Microstructure, Behavioral Finance, and Asset Management

    ERIC Educational Resources Information Center

    Jochec, Marek

    2009-01-01

    This is a study on various aspects of market microstructure, behavioral finance and asset management. In the first chapter we put the PIN variable (Probability of Information-based trading) to test. The PIN variable has been used extensively in the microstructure literature despite the fact that its construction is based on rather strong…

  4. Implementation of a UNIX-Based Network Management System for English Instruction.

    ERIC Educational Resources Information Center

    Schmitt, Lothar M.; Christianson, Kiel T.

    Pedagogical features and implementation of a UNIX-based management system (UNIEM) designed to support the instructor in teaching English as a second language using a network of workstations are described. The application discussed here is for teaching English composition to students at the University of Aizu (Japan). UNIEM is constructed to assist…

  5. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    PubMed

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  6. Conceptual Cost Estimating

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1983-01-01

    Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

  7. Training Programme for Supervisors. An Element in Quality Assurance of the Construction Industry.

    ERIC Educational Resources Information Center

    Lo, Tommy Y.

    1998-01-01

    A customized program on concrete technology for the construction industry in Hong Kong is based on the ISO 9000 quality management system. More than 269 students have been trained; 48.7% of enrollment comes from concrete suppliers. (SK)

  8. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...

  10. Implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction

    NASA Astrophysics Data System (ADS)

    Orlov, Alexandr K.

    2017-10-01

    The article deals with the application of sustainable construction concept within implementation of megaprojects of tourist clusters development using energy saving technologies. The concept of sustainable construction includes the elements of green construction, energy management as well as aspects of the economic efficiency of construction projects implementation. The methodical approach to the implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction is proved. The conceptual approach to the evaluation of the ecological, social and economic components of the integral indicator of the effectiveness of the megaproject for the development of the tourist cluster is provided. The algorithm for estimation of the efficiency of innovative solutions in green construction is considered.

  11. Observing and Understanding Children's Social Interactions. An Impression Management Perspective.

    ERIC Educational Resources Information Center

    Hatch, J. Amos

    1994-01-01

    Describes ways of observing and interpreting children's peer social behavior based on the impression management perspective, which focuses on the social construction of a child's individual self-concept. Suggests that teachers and caregivers can use impression management strategies to observe and promote prosocial development in young children.…

  12. Human Factors Simulation in Construction Management Education

    ERIC Educational Resources Information Center

    Jaeger, M.; Adair, D.

    2010-01-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…

  13. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    PubMed

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. [The therapeutic drug monitoring network server of tacrolimus for Chinese renal transplant patients].

    PubMed

    Deng, Chen-Hui; Zhang, Guan-Min; Bi, Shan-Shan; Zhou, Tian-Yan; Lu, Wei

    2011-07-01

    This study is to develop a therapeutic drug monitoring (TDM) network server of tacrolimus for Chinese renal transplant patients, which can facilitate doctor to manage patients' information and provide three levels of predictions. Database management system MySQL was employed to build and manage the database of patients and doctors' information, and hypertext mark-up language (HTML) and Java server pages (JSP) technology were employed to construct network server for database management. Based on the population pharmacokinetic model of tacrolimus for Chinese renal transplant patients, above program languages were used to construct the population prediction and subpopulation prediction modules. Based on Bayesian principle and maximization of the posterior probability function, an objective function was established, and minimized by an optimization algorithm to estimate patient's individual pharmacokinetic parameters. It is proved that the network server has the basic functions for database management and three levels of prediction to aid doctor to optimize the regimen of tacrolimus for Chinese renal transplant patients.

  15. Construction of a Linux based chemical and biological information system.

    PubMed

    Molnár, László; Vágó, István; Fehér, András

    2003-01-01

    A chemical and biological information system with a Web-based easy-to-use interface and corresponding databases has been developed. The constructed system incorporates all chemical, numerical and textual data related to the chemical compounds, including numerical biological screen results. Users can search the database by traditional textual/numerical and/or substructure or similarity queries through the web interface. To build our chemical database management system, we utilized existing IT components such as ORACLE or Tripos SYBYL for database management and Zope application server for the web interface. We chose Linux as the main platform, however, almost every component can be used under various operating systems.

  16. [Construction of information management-based virtual forest landscape and its application].

    PubMed

    Chen, Chongcheng; Tang, Liyu; Quan, Bing; Li, Jianwei; Shi, Song

    2005-11-01

    Based on the analysis of the contents and technical characteristics of different scale forest visualization modeling, this paper brought forward the principles and technical systems of constructing an information management-based virtual forest landscape. With the combination of process modeling and tree geometric structure description, a software method of interactively and parameterized tree modeling was developed, and the corresponding renderings and geometrical elements simplification algorithms were delineated to speed up rendering run-timely. As a pilot study, the geometrical model bases associated with the typical tree categories in Zhangpu County of Fujian Province, southeast China were established as template files. A Virtual Forest Management System prototype was developed with GIS component (ArcObject), OpenGL graphics environment, and Visual C++ language, based on forest inventory and remote sensing data. The prototype could be used for roaming between 2D and 3D, information query and analysis, and virtual and interactive forest growth simulation, and its reality and accuracy could meet the needs of forest resource management. Some typical interfaces of the system and the illustrative scene cross-sections of simulated masson pine growth under conditions of competition and thinning were listed.

  17. A web-based Decision Support System for the optimal management of construction and demolition waste.

    PubMed

    Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I

    2011-12-01

    Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Safety in construction--a comprehensive description of the characteristics of high safety standards in construction work, from the combined perspective of supervisors and experienced workers.

    PubMed

    Törner, Marianne; Pousette, Anders

    2009-01-01

    The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.

  19. COST ESTIMATING EQUATIONS FOR BEST MANAGEMENT PRACTICES

    EPA Science Inventory

    This paper describes the development of an interactive internet-based cost-estimating tool for commonly used urban storm runoff best management practices (BMP), including: retention and detention ponds, grassed swales, and constructed wetlands. The paper presents the cost data, c...

  20. Managing World Wide Web Information in a Frames Environment: A Guide to Constructing Web Pages Using Frames.

    ERIC Educational Resources Information Center

    Gilstrap, Donald L.

    1998-01-01

    Explains how to build World Wide Web home pages using frames-based HTML so that librarians can manage Web-based information and improve their home pages. Provides descriptions and 15 examples for writing frames-HTML code, including advanced concepts and additional techniques for home-page design. (Author/LRW)

  1. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  2. Industry Software Trustworthiness Criterion Research Based on Business Trustworthiness

    NASA Astrophysics Data System (ADS)

    Zhang, Jin; Liu, Jun-fei; Jiao, Hai-xing; Shen, Yi; Liu, Shu-yuan

    To industry software Trustworthiness problem, an idea aiming to business to construct industry software trustworthiness criterion is proposed. Based on the triangle model of "trustworthy grade definition-trustworthy evidence model-trustworthy evaluating", the idea of business trustworthiness is incarnated from different aspects of trustworthy triangle model for special industry software, power producing management system (PPMS). Business trustworthiness is the center in the constructed industry trustworthy software criterion. Fusing the international standard and industry rules, the constructed trustworthy criterion strengthens the maneuverability and reliability. Quantitive evaluating method makes the evaluating results be intuitionistic and comparable.

  3. Integrating modal-based NDE techniques and bridge management systems using quality management

    NASA Astrophysics Data System (ADS)

    Sikorsky, Charles S.

    1997-05-01

    The intent of bridge management systems is to help engineers and managers determine when and where to spend bridge funds such that commerce and the motoring public needs are satisfied. A major shortcoming which states are experiencing is the NBIS data available is insufficient to perform certain functions required by new bridge management systems, such as modeling bridge deterioration and predicting costs. This paper will investigate how modal based nondestructive damage evaluation techniques can be integrated into bridge management using quality management principles. First, quality from the manufacturing perspective will be summarized. Next, the implementation of quality management in design and construction will be reinterpreted for bridge management. Based on this, a theory of approach will be formulated to improve the productivity of a highway transportation system.

  4. First Steps towards an Interactive Real-Time Hazard Management Simulation

    ERIC Educational Resources Information Center

    Gemmell, Alastair M. D.; Finlayson, Ian G.; Marston, Philip G.

    2010-01-01

    This paper reports on the construction and initial testing of a computer-based interactive flood hazard management simulation, designed for undergraduates taking an applied geomorphology course. Details of the authoring interface utilized to create the simulation are presented. Students act as the managers of civil defence utilities in a fictional…

  5. An Overview of the Object Protocol Model (OPM) and the OPM Data Management Tools.

    ERIC Educational Resources Information Center

    Chen, I-Min A.; Markowitz, Victor M.

    1995-01-01

    Discussion of database management tools for scientific information focuses on the Object Protocol Model (OPM) and data management tools based on OPM. Topics include the need for new constructs for modeling scientific experiments, modeling object structures and experiments in OPM, queries and updates, and developing scientific database applications…

  6. a Quadtree Organization Construction and Scheduling Method for Urban 3d Model Based on Weight

    NASA Astrophysics Data System (ADS)

    Yao, C.; Peng, G.; Song, Y.; Duan, M.

    2017-09-01

    The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.

  7. COST ESTIMATING EQUATIONS FOR BEST MANAGEMENT PRACTICES (BMP)

    EPA Science Inventory

    This paper describes the development of an interactive internet-based cost-estimating tool for commonly used urban storm runoff best management practices (BMP), including: retention and detention ponds, grassed swales, and constructed wetlands. The paper presents the cost data, c...

  8. Base compaction specification feasibility analysis.

    DOT National Transportation Integrated Search

    2012-12-01

    The objective of this research is to establish the technical engineering and cost : analysis concepts that will enable WisDOT management to objectively evaluate the : feasibility of switching construction specification philosophies for aggregate base...

  9. Creating an outcomes framework.

    PubMed

    Doerge, J B

    2000-01-01

    Four constructs used to build a framework for outcomes management for a large midwestern tertiary hospital are described in this article. A system framework outlining a model of clinical integration and population management based in Steven Shortell's work is discussed. This framework includes key definitions of high-risk patients, target groups, populations and community. Roles for each level of population management and how they were implemented in the health care system are described. A point of service framework centered on seven dimensions of care is the next construct applied on each nursing unit. The third construct outlines the framework for role development. Three roles for nursing were created to implement strategies for target groups that are strategic disease categories; two of those roles are described in depth. The philosophy of nursing practice is centered on caring and existential advocacy. The final construct is the modification of the Dartmouth model as a common framework for outcomes. System applications of the scorecard and lessons learned in the 2-year process of implementation are shared

  10. Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis.

    PubMed

    Kucukvar, Murat; Egilmez, Gokhan; Tatari, Omer

    2014-06-01

    Waste management in construction is critical for the sustainable treatment of building-related construction and demolition (C&D) waste materials, and recycling of these wastes has been considered as one of the best strategies in minimization of C&D debris. However, recycling of C&D materials may not always be a feasible strategy for every waste type and therefore recycling and other waste treatment strategies should be supported by robust decision-making models. With the aim of assessing the net carbon, energy, and water footprints of C&D recycling and other waste management alternatives, a comprehensive economic input-output-based hybrid life-cycle assessment model is developed by tracing all of the economy-wide supply-chain impacts of three waste management strategies: recycling, landfilling, and incineration. Analysis results showed that only the recycling of construction materials provided positive environmental footprint savings in terms of carbon, energy, and water footprints. Incineration is a better option as a secondary strategy after recycling for water and energy footprint categories, whereas landfilling is found to be as slightly better strategy when carbon footprint is considered as the main focus of comparison. In terms of construction materials' environmental footprint, nonferrous metals are found to have a significant environmental footprint reduction potential if recycled. © The Author(s) 2014.

  11. Problem Based Learning in Constructed Textile Design

    ERIC Educational Resources Information Center

    Sayer, Kate; Wilson, Jacquie; Challis, Simon

    2006-01-01

    Staff observing undergraduate students enrolled on the BSc Hons Textile Design and Design Management programme in The School of Materials, The University of Manchester, identified difficulties with knowledge retention in the area of constructed textile design. Consequently an experimental pilot was carried out in seamless knitwear design using a…

  12. Study on Evaluation Index System of Green mine construction

    NASA Astrophysics Data System (ADS)

    Li, xin; Yang, JunJie; Yan, Hongcai; Cao, Hongjun

    2017-11-01

    Green mine is a new and science comprehensive construction mode of mine, which runs the concept of green development through the whole process of mineral resources development and utilization, promotes the transformation and upgrading of mineral enterprises and achieves the healthy and sustainable development of mining industry. This paper is based on “the basic conditions of national green mine”, combined with the current situation of green mine construction, constructing green mine construction evaluation index system which is divided into five areas, including management, comprehensive utilization of mineral resources. technological innovation. ecological environment and cultural construction.

  13. Designing for Psychological Change: Individuals’ Reward and Cost Valuations in Weight Management

    PubMed Central

    Blandford, Ann

    2014-01-01

    Background Knowledge of the psychological constructs that underlie behavior offers valuable design opportunities for persuasive systems. We use the decision theory, which describes how behavior is underpinned by reward-cost valuations, as a framework for investigating such psychological constructs to deliver design objectives for weight management technologies. Objective We applied a decision theory–based analysis in the domain of weight management to understand the rewards and costs that surround individuals’ weight management behaviors, with the aim of uncovering design opportunities for weight management technologies. Methods We conducted qualitative interviews with 15 participants who were or had been trying to lose weight. Thematic analysis was used to extract themes that covered the rewards and costs surrounding weight management behaviors. We supplemented our qualitative study with a quantitative survey of 100 respondents investigating the extent to which they agreed with statements reflecting themes from the qualitative study. Results The primary obstacles to weight management were the rewards associated with unhealthy choices, such as the pleasures of unhealthy foods and unrestricted consumption in social situations, and the significant efforts required to change habits, plan, and exercise. Psychological constructs that supported positive weight management included feeling good after making healthy choices, being good to oneself, experiencing healthy yet still delicious foods, and receiving social support and encouraging messages (although opinions about encouraging messages was mixed). Conclusions A rewards-costs driven enquiry revealed a wide range of psychological constructs that contribute to discouraging and supporting weight management. The constructs extracted from our qualitative study were verified by our quantitative survey, in which the majority of respondents also reported similar thoughts and feelings. This understanding of the rewards and costs surrounding weight management offers a range of new opportunities for the design of weight management technologies that enhance the encouraging factors and alleviate the discouraging ones. PMID:24972304

  14. Human factors simulation in construction management education

    NASA Astrophysics Data System (ADS)

    Jaeger, M.; Adair, D.

    2010-06-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management be taught effectively? Although simulations are applied in construction management education, they have not incorporated human factors sufficiently. The focus on human factors as part of the simulation of construction management situations increases students' learning effectiveness within a cross-cultural teaching setting. This paper shows the development of discrete-event human factors in construction management simulation. A description of the source code is given. Learning effectiveness in a cross-cultural education setting was analysed by evaluating data obtained through student questionnaire surveys. The mean score obtained by the students using the simulator was 32% better than those not exposed to the simulator. The spread of results was noticeably greater for the students not exposed to the simulator. The human factors simulation provides an effective means to teach students the complexities and dynamics of interpersonal relationships in construction management.

  15. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  16. Forest management applications of Landsat data in a geographic information system

    NASA Technical Reports Server (NTRS)

    Maw, K. D.; Brass, J. A.

    1982-01-01

    The utility of land-cover data resulting from Landsat MSS classification can be greatly enhanced by use in combination with ancillary data. A demonstration forest management applications data base was constructed for Santa Cruz County, California, to demonstrate geographic information system applications of classified Landsat data. The data base contained detailed soils, digital terrain, land ownership, jurisdictional boundaries, fire events, and generalized land-use data, all registered to a UTM grid base. Applications models were developed from problems typical of fire management and reforestation planning.

  17. Ethical management guidelines for the shanghai disease-based biobank network.

    PubMed

    Zhu, Shu; Shen, Mingxian; Qiu, Xiangxing; Gan, Rongxing; Hu, Qingli

    2015-02-01

    The Ethical Management Guidelines for the Shanghai Disease-Based Biobank Network are intended to safeguard the interests of all the participants, to standardize the construction, management, and resource sharing of the Shanghai Disease-based Biobank Network, to promote the development of medical research, and to improve public health and well-being. The guidelines contain seven chapters: General Principles; Informed Consent; Use of Bio-samples from Persons without the Capacity to Consent; Privacy and Confidentiality; Applications of Use of Biological Samples and Data; Intellectual Property and Resource Sharing; and Conflict of Interest.

  18. Introduction of Building Information Modeling (BIM) Technologies in Construction

    NASA Astrophysics Data System (ADS)

    Milyutina, M. A.

    2018-05-01

    The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.

  19. Information-based management mode based on value network analysis for livestock enterprises

    NASA Astrophysics Data System (ADS)

    Liu, Haoqi; Lee, Changhoon; Han, Mingming; Su, Zhongbin; Padigala, Varshinee Anu; Shen, Weizheng

    2018-01-01

    With the development of computer and IT technologies, enterprise management has gradually become information-based management. Moreover, due to poor technical competence and non-uniform management, most breeding enterprises show a lack of organisation in data collection and management. In addition, low levels of efficiency result in increasing production costs. This paper adopts 'struts2' in order to construct an information-based management system for standardised and normalised management within the process of production in beef cattle breeding enterprises. We present a radio-frequency identification system by studying multiple-tag anti-collision via a dynamic grouping ALOHA algorithm. This algorithm is based on the existing ALOHA algorithm and uses an improved packet dynamic of this algorithm, which is characterised by a high-throughput rate. This new algorithm can reach a throughput 42% higher than that of the general ALOHA algorithm. With a change in the number of tags, the system throughput is relatively stable.

  20. Using a data base management system for modelling SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, K.

    1985-01-01

    The usefulness of a data base management system (DBMS) for modelling historical test data for the complete series of static test firings for the Space Shuttle Main Engine (SSME) was assessed. From an analysis of user data base query requirements, it became clear that a relational DMBS which included a relationally complete query language would permit a model satisfying the query requirements. Representative models and sample queries are discussed. A list of environment-particular evaluation criteria for the desired DBMS was constructed; these criteria include requirements in the areas of user-interface complexity, program independence, flexibility, modifiability, and output capability. The evaluation process included the construction of several prototype data bases for user assessement. The systems studied, representing the three major DBMS conceptual models, were: MIRADS, a hierarchical system; DMS-1100, a CODASYL-based network system; ORACLE, a relational system; and DATATRIEVE, a relational-type system.

  1. Climatic and psychosocial risks of heat illness incidents on construction site.

    PubMed

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  2. Differences between multimedia and text-based assessments of emotion management: An exploration with the multimedia emotion management assessment (MEMA).

    PubMed

    MacCann, Carolyn; Lievens, Filip; Libbrecht, Nele; Roberts, Richard D

    2016-11-01

    People process emotional information using visual, vocal, and verbal cues. However, emotion management is typically assessed with text based rather than multimedia stimuli. This study (N = 427) presents the new multimedia emotion management assessment (MEMA) and compares it to the text-based assessment of emotion management used in the MSCEIT. The text-based and multimedia assessment showed similar levels of cognitive saturation and similar prediction of relevant criteria. Results demonstrate that the MEMA scores have equivalent evidence of validity to the text-based MSCEIT test scores, demonstrating that multimedia assessment of emotion management is viable. Furthermore, our results inform the debate as to whether cognitive saturation in emotional intelligence (EI) measures represents "noise" or "substance". We find that cognitive ability associations with EI represent substantive variance rather than construct-irrelevant shared variance due to reading comprehension ability required for text-based items.

  3. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    PubMed Central

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  4. Final Natural Resource Actions Environmental Assessment

    DTIC Science & Technology

    2005-06-22

    populations through use of insecticides and rodenticides would be accomplished under the supervision of the Base Pest Management Office and coordinated... Insecticide , Fungicide, and Rodenticide Act; DoD Directive 4150.7, DoD Pest Management Program; AFI 32-1053, Pest Management Program; and the North... insecticide and herbicide. Grand Forks AFB constructed a 2,400-square-foot pest management facility in 1996 in accor- dance with the guidelines

  5. Dialogue, Language and Identity: Critical Issues for Networked Management Learning

    ERIC Educational Resources Information Center

    Ferreday, Debra; Hodgson, Vivien; Jones, Chris

    2006-01-01

    This paper draws on the work of Mikhail Bakhtin and Norman Fairclough to show how dialogue is central to the construction of identity in networked management learning. The paper is based on a case study of a networked management learning course in higher education and attempts to illustrate how participants negotiate issues of difference,…

  6. Confirming the Stankosky Knowledge Management Framework

    ERIC Educational Resources Information Center

    Ternes, Carl D., Jr.

    2011-01-01

    As a managerial construct, knowledge management (KM) optimizes organizational knowledge assets to achieve sustainable business advantages by connecting people with the intellectual resources needed to operate more effectively. Yet KM may have its greatest impact when used with repeatable, systems engineering-based "frameworks." As such, this study…

  7. ICT use for information management in healthcare system for chronic disease patient

    NASA Astrophysics Data System (ADS)

    Wawrzyniak, Zbigniew M.; Lisiecka-Biełanowicz, Mira

    2013-10-01

    Modern healthcare systems are designed to fulfill needs of the patient, his system environment and other determinants of the treatment with proper support of technical aids. A whole system of care is compatible to the technical solutions and organizational framework based on legal rules. The purpose of this study is to present how can we use Information and Communication Technology (ICT) systemic tools in a new model of patient-oriented care, improving the effectiveness of healthcare for patients with chronic diseases. The study material is the long-term process of healthcare for patients with chronic illness. Basing on the knowledge of the whole circumstances of patient's ecosystem and his needs allow us to build a new ICT model of long term care. The method used is construction, modeling and constant improvement the efficient ICT layer for the patient-centered healthcare model. We present a new constructive approach to systemic process how to use ICT for information management in healthcare system for chronic disease patient. The use of ICT tools in the model for chronic disease can improve all aspects of data management and communication, and the effectiveness of long-term complex healthcare. In conclusion: ICT based model of healthcare can be constructed basing on the interactions of ecosystem's functional parts through information feedback and the provision of services and models as well as the knowledge of the patient itself. Systematic approach to the model of long term healthcare assisted functionally by ICT tools and data management methods will increase the effectiveness of patient care and organizational efficiency.

  8. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  9. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  10. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  11. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  12. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  13. Quality Dashboards: Technical and Architectural Considerations of an Actionable Reporting Tool for Population Management

    PubMed Central

    Olsha-Yehiav, Maya; Einbinder, Jonathan S.; Jung, Eunice; Linder, Jeffrey A.; Greim, Julie; Li, Qi; Schnipper, Jeffrey L.; Middleton, Blackford

    2006-01-01

    Quality Dashboards (QD) is a condition-specific, actionable web-based application for quality reporting and population management that is integrated into the Electronic Health Record (EHR). Using server-based graphic web controls in a .Net environment to construct Quality Dashboards allows customization of the reporting tool without the need to rely on commercial business intelligence tool. Quality Dashboards will improve patient care and quality outcomes as clinicians utilize the reporting tool for population management. PMID:17238671

  14. A Hadoop-based Molecular Docking System

    NASA Astrophysics Data System (ADS)

    Dong, Yueli; Guo, Quan; Sun, Bin

    2017-10-01

    Molecular docking always faces the challenge of managing tens of TB datasets. It is necessary to improve the efficiency of the storage and docking. We proposed the molecular docking platform based on Hadoop for virtual screening, it provides the preprocessing of ligand datasets and the analysis function of the docking results. A molecular cloud database that supports mass data management is constructed. Through this platform, the docking time is reduced, the data storage is efficient, and the management of the ligand datasets is convenient.

  15. Validation of the School Conflict Negotiation Effectiveness Questionnaire

    ERIC Educational Resources Information Center

    Cunha, Pedro; Lourenço, Abílio; Paiva, Maria Olímpia; Monteiro, Ana Paula

    2017-01-01

    This research aimed to construct and validate the School Conflict Negotiation Effectiveness Questionnaire (SCNEQ). This objective is both based on the increasing relevance of the area of constructive conflict management in schools and also in the scarcity of instruments that try to measure these dimensions in the educational context. We used two…

  16. Research on technology environment improvement of related industries based on internet governance

    NASA Astrophysics Data System (ADS)

    Zhang, Jing; Guan, Zhongliang

    2017-08-01

    The technology of Internet is an important factor of industry’s development. Constructing a good technical environment is the foundation of the Internet and related industries’ development. This paper demonstrates the necessity of the construction and improvement of the Internet and the related industries technology environment through comparing the current situation of the related industries. It also points out that China needs to improve the environment of the Internet technology urgently. The paper establishes the technology demand pattern of different related industries, and explores strategies of the different Internet technology environment’s construction and perfection according to the different demand of the strong related Internet and the weak related Internet to the industries environment. This paper analyzes the factors that threaten the security of the Internet, and fully demonstrates the methods and tactics of establishing and improving the technology environment Internet hardware, the Internet and related industries in China under the basis of the framework of comprehensive management of Internet. This paper also studies the construction and improvement of the comprehensive management technology environment based on the Internet industry in China.

  17. Factors affecting the implementation of green specifications in construction.

    PubMed

    Lam, Patrick T I; Chan, Edwin H W; Poon, C S; Chau, C K; Chun, K P

    2010-01-01

    Green specifications constitute one of the important elements in green construction. New sustainability requirements and changing priorities in construction management have spurred the emerging green specifications to a faster pace of development. A cross-sectional survey has been conducted in Hong Kong in 2007 to identify principal factors leading to the success of preparing green specifications. Based on extensive construction management literature, 20 variables concerning sustainable construction were summarized. Using the Mann-Whitney U-test, the subtle differences between stakeholders in specifying construction work have been detected even with the high consistency of the responses among the groups. Moreover, five independent factors for successful specification of green construction have been categorized by factor analysis. They are related to (1) green technology and techniques, (2) reliability and quality of specification, (3) leadership and responsibility, (4) stakeholder involvement, and (5) guide and benchmarking systems. Whilst the first and fourth factors are generally more important, different stakeholder groups have different emphases. The results of the survey have been validated against established principles. 2009 Elsevier Ltd. All rights reserved.

  18. Key factors contributing to accident severity rate in construction industry in Iran: a regression modelling approach.

    PubMed

    Soltanzadeh, Ahmad; Mohammadfam, Iraj; Moghimbeigi, Abbas; Ghiasvand, Reza

    2016-03-01

    Construction industry involves the highest risk of occupational accidents and bodily injuries, which range from mild to very severe. The aim of this cross-sectional study was to identify the factors associated with accident severity rate (ASR) in the largest Iranian construction companies based on data about 500 occupational accidents recorded from 2009 to 2013. We also gathered data on safety and health risk management and training systems. Data were analysed using Pearson's chi-squared coefficient and multiple regression analysis. Median ASR (and the interquartile range) was 107.50 (57.24- 381.25). Fourteen of the 24 studied factors stood out as most affecting construction accident severity (p<0.05). These findings can be applied in the design and implementation of a comprehensive safety and health risk management system to reduce ASR.

  19. Construction risk assessment of deep foundation pit in metro station based on G-COWA method

    NASA Astrophysics Data System (ADS)

    You, Weibao; Wang, Jianbo; Zhang, Wei; Liu, Fangmeng; Yang, Diying

    2018-05-01

    In order to get an accurate understanding of the construction safety of deep foundation pit in metro station and reduce the probability and loss of risk occurrence, a risk assessment method based on G-COWA is proposed. Firstly, relying on the specific engineering examples and the construction characteristics of deep foundation pit, an evaluation index system based on the five factors of “human, management, technology, material and environment” is established. Secondly, the C-OWA operator is introduced to realize the evaluation index empowerment and weaken the negative influence of expert subjective preference. The gray cluster analysis and fuzzy comprehensive evaluation method are combined to construct the construction risk assessment model of deep foundation pit, which can effectively solve the uncertainties. Finally, the model is applied to the actual project of deep foundation pit of Qingdao Metro North Station, determine its construction risk rating is “medium”, evaluate the model is feasible and reasonable. And then corresponding control measures are put forward and useful reference are provided.

  20. A scoping review of applications and outcomes of traction orthoses and constructs for the management of intra-articular fractures and fracture dislocations in the hand.

    PubMed

    Packham, Tara L; Ball, Pamela D; MacDermid, Joy C; Bain, James R; DalCin, Arianna

    2016-01-01

    Intra-articular hand fractures can have devastating consequences for movement and function. The unique nature of the injury and diverse management strategies are a challenge for conducting trials. To conduct a scoping review of traction constructs for the management of intra-articular hand fractures. We conducted a systematic search of the literature, extracting data on the scope and nature of the evidence for traction constructs. Our search yielded 87 articles addressing 3 traction constructs: (1) static traction (n = 17), (2) dynamic external fixation (n = 53), and (3) dynamic orthoses (n = 17). Active range of motion of the target joint was the most frequently reported outcome. Study designs included 36 cohorts, 21 case series, and 9 case studies: 24% contained only technical information. The current literature addressing traction constructs consists primarily of small and low-quality studies. Evidence synthesis could improve the estimation of range of motion outcomes but would not be able to identify the best treatment. Consensus on classification of fracture patterns, routine use of outcome measures, and randomized trials are needed to compare different traction constructs and inform evidence-based care. Scoping review. N/A. Copyright © 2016 Hanley & Belfus. Published by Elsevier Inc. All rights reserved.

  1. Application of Strategic Management Principles as Tool to Improve Quality of Construction Technological Process

    NASA Astrophysics Data System (ADS)

    Kluchnikova, O.; Pobegaylov, O.

    2017-11-01

    The article focuses on the basic theory and practical aspects of the strategic management improving in terms of enhancing the quality of a technological process: these aspects have been proven experimentally by their introduction in company operations. The authors have worked out some proposals aimed at the selection of an optimal supplier for building companies as well as the algorithm for the analysis and optimization of a construction company basing on scientific and practical research as well as on the experimental data obtained in the experiment.

  2. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  3. Concrete debris assessment for road construction activities : summary.

    DOT National Transportation Integrated Search

    2016-09-01

    University of Florida researchers studied the possible : impact of recycled concrete aggregate (RCA) used in : roadway base layers on the acid/base balance of the : subsurface environment. They also examined a related : issue: management of concrete ...

  4. Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans

    EPA Pesticide Factsheets

    This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.

  5. Photocopy of photograph (original print is located at Engineering Management ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of photograph (original print is located at Engineering Management Building, Naval Shipyard, Long Beach). Navy Photography, July 4, 1942, Photograph #2225. CONSTRUCTION OF BUILDING 1 - Roosevelt Base, Administration & Brig Building, Bounded by Nevada & Colorado Streets, Reeves & Richardson Avenues, Long Beach, Los Angeles County, CA

  6. Construction Manager or General Contractor?

    ERIC Educational Resources Information Center

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  7. Construction Management Meets Today's Realities.

    ERIC Educational Resources Information Center

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  8. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  9. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  10. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  11. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  12. Protest and survive, the U.K. Construction Safety Campaign: a case study of workers' and victims' family action and legal and regulatory inaction on construction health and safety.

    PubMed

    Holder, Mick; O'Brien, Tony

    2007-01-01

    The U.K. Construction Safety Campaign, based on grass-roots rank-and-file trade union activity, has both a domestic agenda and a wider sphere with regard to international developments. Using organized protests and media exposure to achieve its ends, the Campaign has contributed substantially to reducing injuries and fatalities in the U.K. construction industry, as well as achieving some justice for victims of the industry's neglect of safe management practices.

  13. On construction method of shipborne and airborne radar intelligence and related equipment knowledge graph

    NASA Astrophysics Data System (ADS)

    Hao, Ruizhe; Huang, Jian

    2017-08-01

    Knowledge graph construction in military intelligence domain is sprouting but technically immature. This paper presents a method to construct the heterogeneous knowledge graph in the field of shipborne and airborne radar and equipment. Based on the expert knowledge and the up-to-date Internet open source information, we construct the knowledge graph of radar characteristic information and the equipment respectively, and establish relationships between two graphs, providing the pipeline and method for the intelligence organization and management in the context of the crowding battlefields big data.

  14. Towards a Competency-based Vision for Construction Safety Education

    NASA Astrophysics Data System (ADS)

    Pedro, Akeem; Hai Chien, Pham; Park, Chan Sik

    2018-04-01

    Accidents still prevail in the construction industry, resulting in injuries and fatalities all over the world. Educational programs in construction should deliver safety knowledge and skills to students who will become responsible for ensuring safe construction work environments in the future. However, there is a gap between the competencies current pedagogical approaches target, and those required for safety in practice. This study contributes to addressing this issue in three steps. Firstly, a vision for competency-based construction safety education is conceived. Building upon this, a research scheme to achieve the vision is developed, and the first step of the scheme is initiated in this study. The critical competencies required for safety education are investigated through analyses of literature, and confirmed through surveys with construction and safety management professionals. Results from the study would be useful in establishing and orienting education programs towards current industry safety needs and requirements

  15. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  16. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  17. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  18. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  19. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  20. Relational Information Management Data-Base System

    NASA Technical Reports Server (NTRS)

    Storaasli, O. O.; Erickson, W. J.; Gray, F. P.; Comfort, D. L.; Wahlstrom, S. O.; Von Limbach, G.

    1985-01-01

    DBMS with several features particularly useful to scientists and engineers. RIM5 interfaced with any application program written in language capable of Calling FORTRAN routines. Applications include data management for Space Shuttle Columbia tiles, aircraft flight tests, high-pressure piping, atmospheric chemistry, census, university registration, CAD/CAM Geometry, and civil-engineering dam construction.

  1. Managing Tensions in Educational Organizations: Trying for a Win-Win Approach.

    ERIC Educational Resources Information Center

    Grab, Rudi

    1996-01-01

    Constructive tension can be healthy for an organization. Although win-lose solutions based on adversarial strategies are common, the management of conflicts in schools should focus on win-win problem solving, which requires creativity. Identifies collaboration as the most desirable conflict resolution strategy, and discusses conflict management…

  2. Nurses' adherence to the Kangaroo Care Method: support for nursing care management1

    PubMed Central

    da Silva, Laura Johanson; Leite, Josete Luzia; Scochi, Carmen Gracinda Silvan; da Silva, Leila Rangel; da Silva, Thiago Privado

    2015-01-01

    OBJECTIVE: construct an explanatory theoretical model about nurses' adherence to the Kangaroo Care Method at the Neonatal Intensive Care Unit, based on the meanings and interactions for care management. METHOD: qualitative research, based on the reference framework of the Grounded Theory. Eight nurses were interviewed at a Neonatal Intensive Care Unit in the city of Rio de Janeiro. The comparative analysis of the data comprised the phases of open, axial and selective coding. A theoretical conditional-causal model was constructed. RESULTS: four main categories emerged that composed the analytic paradigm: Giving one's best to the Kangaroo Method; Working with the complexity of the Kangaroo Method; Finding (de)motivation to apply the Kangaroo Method; and Facing the challenges for the adherence to and application of the Kangaroo Method. CONCLUSIONS: the central phenomenon revealed that each nurse and team professional has a role of multiplying values and practices that may or may not be constructive, potentially influencing the (dis)continuity of the Kangaroo Method at the Neonatal Intensive Care Unit. The findings can be used to outline management strategies that go beyond the courses and training and guarantee the strengthening of the care model. PMID:26155013

  3. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  4. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  5. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  6. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  7. Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand.

    PubMed

    Manowong, Ektewan

    2012-01-01

    Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.

  8. Group Selection and Learning for a Lab-Based Construction Management Course

    ERIC Educational Resources Information Center

    Solanki, Pranshoo; Kothari, Nidhi

    2014-01-01

    In construction industries' projects, working in groups is a normal practice. Group work in a classroom is defined as students working collaboratively in a group so that everyone can participate on a collective task. The results from literature review indicate that group work is more effective method of learning as compared to individual work.…

  9. A Web Browser Interface to Manage the Searching and Organizing of Information on the Web by Learners

    ERIC Educational Resources Information Center

    Li, Liang-Yi; Chen, Gwo-Dong

    2010-01-01

    Information Gathering is a knowledge construction process. Web learners make a plan for their Information Gathering task based on their prior knowledge. The plan is evolved with new information encountered and their mental model is constructed through continuously assimilating and accommodating new information gathered from different Web pages. In…

  10. Being Female Doing Gender. Narratives of Women in Education Management

    ERIC Educational Resources Information Center

    Priola, Vincenza

    2007-01-01

    The paper explores gender relations in academia and discusses how gender is constructed within academic institutions. It is based upon the study of a business school, part of a British university. The construction of gender relations within this institution was of special interest because the majority of managerial roles were occupied by women.…

  11. De-mystifying earned value management for ground based astronomy projects, large and small

    NASA Astrophysics Data System (ADS)

    Norton, Timothy; Brennan, Patricia; Mueller, Mark

    2014-08-01

    The scale and complexity of today's ground based astronomy projects have justifiably required Principal Investigator's and their project teams to adopt more disciplined management processes and tools in order to achieve timely and accurate quantification of the progress and relative health of their projects. Earned Value Management (EVM) is one such tool. Developed decades ago and used extensively in the defense and construction industries, and now a requirement of NASA projects greater than $20M; EVM has gained a foothold in ground-based astronomy projects. The intent of this paper is to de-mystify EVM by discussing the fundamentals of project management, explaining how EVM fits with existing principles, and describing key concepts every project can use to implement their own EVM system. This paper also discusses pitfalls to avoid during implementation and obstacles to its success. The authors report on their organization's most recent experience implementing EVM for the GMT-Consortium Large Earth Finder (G-CLEF) project. G-CLEF is a fiber-fed, optical echelle spectrograph that has been selected as a first light instrument for the Giant Magellan Telescope (GMT), planned for construction at the Las Campanas Observatory in Chile's Atacama Desert region.

  12. Treatment Seeking and Self-Constructed Explanations of Pain and Pain Management Strategies Among Adolescents with Temporomandibular Disorder Pain.

    PubMed

    Nilsson, Ing-Marie; Willman, Ania

    2016-01-01

    To explore adolescents' explanations of their temporomandibular disorder (TMD) pain, their pain management strategies for TMD pain, and their treatment-seeking behavior. One-on-one interviews were conducted with 21 adolescents aged 15 to 19 years who had TMD pain and followed a semistructured interview guide. Subjects were strategically selected from patients referred to an orofacial pain clinic. All participants had been examined and received a pain diagnosis based on the Research Diagnostic Criteria for TMD. The interviews focused on the adolescents' experiences of TMD pain, their strategies for handling pain, and how they seek care. The interviews were recorded, transcribed verbatim, and analyzed using qualitative manifest content analysis. Qualitative manifest content analysis revealed two categories: (1) self-constructed explanations, with three subcategories (situation-based explanatory model, physical/biologic model, and psychological explanatory model); and (2) pain management strategies, with four subcategories (social support, treatment, relaxation/rest, and psychological strategies). Adolescents used physical activities and psychological and pharmacologic treatment to manage pain. Reasons for seeking treatment were to be cured, to obtain an explanation for their pain, and because their symptoms bother others. Adolescents living with TMD pain develop self-constructed explanations and pain management strategies. With access to these descriptions, dentists can be better prepared to have a dialogue with their adolescent patients about their own explanations of pain, the nature of pain, and in which situations the pain appears. Dentists can also explore adolescent patients' pain management strategies and perhaps also suggest new treatment strategies at an earlier stage.

  13. [Obstacles found in the construction of a democratic and participatory hospital management model].

    PubMed

    Bernardes, Andrea; Cecílio, Luis Carlos de Oliveira; Nakao, Janete R S; Evora, Yolanda D Martinez

    2007-01-01

    A path leading to management modernization is based on an approach stressing dialog and discussions of the construction of a healthcare enhancement project whose main characteristic is its emphasis on joint management concepts at all levels. This paper assesses almost ten years of management by committee in a public hospital in Rio de Janeiro State, Brazil, seeking impacts on its micro-policies. The intention is to identify and analyze how the nursing staff experienced the implantation of this management model in the hospital. Empirical matters were analyzed at two levels: initially the comments of the players were grouped into themes, followed by cross-theme readings that analyzed the concept of "noise". The remarks made by the respondents indicated that this "noise" functions within the organization, demonstrating that the selected management process and the manner in which it was conducted are not sufficient to penetrate and intervene in institutional micro-policies, leaving gaps between the proposals set forth by this management model and the real situation of the workers.

  14. Pilot-based assessment of the economics of recycling construction demolition waste.

    PubMed

    Srour, Issam M; Chehab, Ghassan R; El-Fadel, Mutasem; Tamraz, Sandy

    2013-11-01

    The significant amount of waste generated from construction demolition has become a chronic problem in many developing countries. Using data obtained from demolition contractors and various other sources, this paper proposes a framework for proper handling of construction demolition waste (CDW) to serve as a decision support tool in countries suffering from the lack of national CDW management guidelines. The framework is then demonstrated through a case study in the city of Beirut, Lebanon, and a sensitivity analysis is carried out to examine the economic feasibility of developing a recycling facility. The analysis showed that in order for a facility to be feasible, a gate fee should be charged in the presence of a market for recycled aggregates. The results confirm the significance of instigating and implementing legislation to control illegal dumping, constructing, and managing engineered landfills, and establishing markets for recycled CDW.

  15. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  16. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  17. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  18. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  19. Interpersonal Conflict Management

    ERIC Educational Resources Information Center

    Roark, Albert E.

    1978-01-01

    The difference between constructive and destructive conflicts may be traced to the way in which they are managed. Third-party help is often utilized to achieve constructive conflict management. This article describes two models for conflict management consultation. Five guidelines are given for constructive conflict management. (Author/JEL)

  20. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    PubMed

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  1. Re-Writing the Construction History of Boughton House (northamptonshire, Uk) with the Help of DOCU-TOOLS®

    NASA Astrophysics Data System (ADS)

    Schuster, J. C.

    2017-08-01

    The tablet-based software docu-tools digitize the documentation of buildings, simplifies construction and facility management and the data analysis in building and construction-history research. As a plan-based software, `pins' can be set to record data (images, audio, text etc.), each data point containing a time and date stamp. Once a pin is set and information recorded, it can never be deleted from the system, creating clear contentious-free documentation. Reports to any/all data recorded can immediately be generated through various templates in order to share, document, analyze and archive the information gathered. The software both digitizes building condition assessment, as well as simplifies the fully documented management and solving of problems and monitoring of a building. Used both in the construction industry and for documenting and analyzing historic buildings, docu-tools is a versatile and flexible tool that has become integral to my work as a building historian working on the conservation and curating of the historic built environment in Europe. I used the software at Boughton House, Northamptonshire, UK, during a one-year research project into the construction history of the building. The details of how docu-tools was used during this project will be discussed in this paper.

  2. Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong.

    PubMed

    Hossain, Md Uzzal; Wu, Zezhou; Poon, Chi Sun

    2017-11-01

    This study aimed to compare the environmental performance of building construction waste management (CWM) systems in Hong Kong. Life cycle assessment (LCA) approach was applied to evaluate the performance of CWM systems holistically based on primary data collected from two real building construction sites and secondary data obtained from the literature. Different waste recovery rates were applied based on compositions and material flow to assess the influence on the environmental performance of CWM systems. The system boundary includes all stages of the life cycle of building construction waste (including transportation, sorting, public fill or landfill disposal, recovery and reuse, and transformation and valorization into secondary products). A substitutional LCA approach was applied for capturing the environmental gains due to the utilizations of recovered materials. The results showed that the CWM system by using off-site sorting and direct landfilling resulted in significant environmental impacts. However, a considerable net environmental benefit was observed through an on-site sorting system. For example, about 18-30kg CO 2 eq. greenhouse gases (GHGs) emission were induced for managing 1 t of construction waste through off-site sorting and direct landfilling, whereas significant GHGs emission could be potentially avoided (considered as a credit -126 to -182kg CO 2 eq.) for an on-site sorting system due to the higher recycling potential. Although the environmental benefits mainly depend on the waste compositions and their sortability, the analysis conducted in this study can serve as guidelines to design an effective and resource-efficient building CWM system. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Empirical research on the influencing factors of the occupational stress for construction workers

    NASA Astrophysics Data System (ADS)

    LV, Xing; WU, Xiang; CI, Huipeng; LIU, Qing; YAO, Yongzheng

    2017-04-01

    Employee’s occupational stress and safety performance are highly related, which has been generally recognized by the researchers. We did this research to understand the status of the stress for construction workers, and explore the influence factors of pressure source with characteristics of construction industry. Based on the results of previous studies, we designed questionnaire to collect the influence factors on occupational stressors. The study selected workers from certain construction units at the grass-roots level as sample source. According to the results of the questionnaire, we redesigned the interview outline, and did the semi-structured interviews on workers randomly selected. Finally, we developed a scale which combined the characteristics of construction projects in China. Using SPSS software for factor analysis, reliability analysis, and descriptive statistical analysis, the results show that there are six factors affecting the workers’ occupational stress, including The Work Itself, Family-Work, Career Development, Organization Style, Interpersonal Relationship and Role Management Style. The work itself is the main sources of occupational stress. The results can be used by the construction company to provide guidance for workers to control and manage occupational stress.

  4. Modeling Off-Nominal Recovery in NextGen Terminal-Area Operations

    NASA Technical Reports Server (NTRS)

    Callantine, Todd J.

    2011-01-01

    Robust schedule-based arrival management requires efficient recovery from off-nominal situations. This paper presents research on modeling off-nominal situations and plans for recovering from them using TRAC, a route/airspace design, fast-time simulation, and analysis tool for studying NextGen trajectory-based operations. The paper provides an overview of a schedule-based arrival-management concept and supporting controller tools, then describes TRAC implementations of methods for constructing off-nominal scenarios, generating trajectory options to meet scheduling constraints, and automatically producing recovery plans.

  5. A resource management scenario for traditional and scientific management of pink shrimp (Farfantepenaeus paulensis) in the Patos Lagoon estuary (RS), Brazil

    PubMed Central

    2013-01-01

    Background This article aims to discuss the incorporation of traditional time in the construction of a management scenario for pink shrimp in the Patos Lagoon estuary (RS), Brazil. To meet this objective, two procedures have been adopted; one at a conceptual level and another at a methodological level. At the conceptual level, the concept of traditional time as a form of traditional ecological knowledge (TEK) was adopted. Method At the methodological level, we conduct a wide literature review of the scientific knowledge (SK) that guides recommendations for pink shrimp management by restricting the fishing season in the Patos Lagoon estuary; in addition, we review the ethno-scientific literature which describes traditional calendars as a management base for artisanal fishers in the Patos Lagoon estuary. Results Results demonstrate that TEK and SK describe similar estuarine biological processes, but are incommensurable at a resource management level. On the other hand, the construction of a “management scenario” for pink shrimp is possible through the development of “criteria for hierarchies of validity” which arise from a productive dialog between SK and TEK. Conclusions The commensurable and the incommensurable levels reveal different basis of time-space perceptions between traditional ecological knowledge and scientific knowledge. Despite incommensurability at the management level, it is possible to establish guidelines for the construction of “management scenarios” and to support a co-management process. PMID:23311826

  6. Construction Management--Exploding Some Myths.

    ERIC Educational Resources Information Center

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  7. Improvement of the material and transport component of the system of construction waste management

    NASA Astrophysics Data System (ADS)

    Kostyshak, Mikhail; Lunyakov, Mikhail

    2017-10-01

    Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.

  8. Design and Construction for Community Health Service Precision Fund Appropriation System Based on Performance Management.

    PubMed

    Gao, Xing; He, Yao; Hu, Hongpu

    2017-01-01

    Allowing for the differences in economy development, informatization degree and characteristic of population served and so on among different community health service organizations, community health service precision fund appropriation system based on performance management is designed, which can provide support for the government to appropriate financial funds scientifically and rationally for primary care. The system has the characteristic of flexibility and practicability, in which there are five subsystems including data acquisition, parameter setting, fund appropriation, statistical analysis system and user management.

  9. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. Study on the quality of FRP fishing vessel based on improved Fishbone Chart

    NASA Astrophysics Data System (ADS)

    Sui, J. H.; Yu, Y. F.; Du, Q. F.; Jiang, D. W.

    2018-01-01

    The construction quality of FRP fishing vessels influences their production, use and industry development. In order to explore the factors that affect the construction quality of FRP fishing vessels, key factors affecting the construction quality of FRP fishing vessels are determined based on the quality problems of FRP fishing vessels constructed. The improved Fishbone Chart is used to analyze the eight factors of “human, machine, material, process, environment, inspection, design and information”. Taking the factors that affect the construction quality of FRP fishing vessels as the central target, the eight influencing factors were condensed into five aspects and a composite Fishbone Chart is drawn. The Fishbone Chart is used as the basic model, the influencing factors are sorted, screened and discriminated, and the system model convenient for construction site management and control is established. Finally, the causes of poor construction of FRP fishing vessels are analyzed and discussed, and relevant suggestions are put forward.

  11. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...

  12. Formation of the perspective innovation policy of the enterprise in the conditions of organizational-economic changes

    NASA Astrophysics Data System (ADS)

    Uvarova, Svetlana; Vlasenko, Vyacheslav; Bukreev, Anatoly; Myshovskaya, Ludmila; Kuzina, Olga

    2018-03-01

    This article is based on the analysis of modern condition and dynamics of innovational development of high-rise buildings construction. A number of cardinal organizational and economic changes in management at the macro and meso-levels is taken into the account. Principal scheme of development of the methodology of formation of perspective innovation politics in high-ruse buildings construction based on inculcation of modern methods of strategic control of innovational activity is suggested in this article.

  13. IPAD II (Integrated Programs for Aerospace-Vehicle Design) Advances in Distributed Data Base Management for CAD/CAM (Computer-Aided Design and Manufacturing Technology). Proceedings of a National Symposium Held in Denver, Colorado, April 17-19, 1984.

    DTIC Science & Technology

    1984-01-01

    working drawings, lists, and miscellaneous information needed for construction and testing (fig. 4). Detail design and construction in- cludes...still in test and evaluation phases, and is currently operational on a CDC computer. Its approach to management of geometric data is a unique and...been to provide the high degree of engineering user flexibility and yet achieve acceptable response times. In late 1983, a test system which has user

  14. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China.

    PubMed

    Lu, Weisheng; Yuan, Hongping; Li, Jingru; Hao, Jane J L; Mi, Xuming; Ding, Zhikun

    2011-04-01

    The construction and demolition waste generation rates (C&D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m(2) and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C&D waste management in China. Copyright © 2010 Elsevier Ltd. All rights reserved.

  15. 24 CFR 585.305 - Eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... payments and other assistance required to comply with § 585.308, legal fees, and construction management...) Wages, benefits and need-based stipends provided to participants; (j) Leadership development, counseling...

  16. Managing large energy and mineral resources (EMR) projects in challenging environments

    NASA Astrophysics Data System (ADS)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.

  17. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  18. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    PubMed

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  19. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    PubMed Central

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  20. Management of construction and demolition wastes as secondary building resources

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  1. Assessing problem-solving skills in construction education with the virtual construction simulator

    NASA Astrophysics Data System (ADS)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  2. Objective, Way and Method of Faculty Management Based on Ergonomics

    ERIC Educational Resources Information Center

    WANG, Hong-bin; Liu, Yu-hua

    2008-01-01

    The core problem that influences educational quality of talents in colleges and universities is the faculty management. Without advanced faculty, it is difficult to cultivate excellent talents. With regard to some problems in present faculty construction of colleges and universities, this paper puts forward the new objectives, ways and methods of…

  3. The Construction of an Environmental Management Model Based on Sustainability Indicators on a Higher Education Institution in Mexico

    ERIC Educational Resources Information Center

    Nieblas-Ortiz, Efrain C.; Arcos-Vega, José L.; Sevilla-García, Juan J.

    2017-01-01

    Without depreciating the importance of environmental regulations directed to university environmental managements systems in this country, nowadays, the instruments of international importance like the Sustainable Development Goals or ONU's 2030 Agenda; as well as those of domestic nature, like sustainability indicators proposed by the Mexican…

  4. We're Decent People: Constructing and Managing Family Identity in Rural Workingclass Communities

    ERIC Educational Resources Information Center

    Kiter Edwards, Margie L.

    2004-01-01

    Using grounded theory methodology, I establish family identity management as an important type of invisible work that connects women's household-based domestic activities with community members perceptions and treatment of them and their family members. Detailed observations of household routines and family interactions, as well as in-depth…

  5. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  6. Construction Management: Building Schools Faster in the International Marketplace

    ERIC Educational Resources Information Center

    Scarano, Joseph J.

    1976-01-01

    Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)

  7. Justification of system of assessment of ecological safety degree of housing construction objects

    NASA Astrophysics Data System (ADS)

    Kankhva, Vadim

    2017-10-01

    In article characteristics and properties of competitiveness of housing construction objects are investigated, criteria and points of national systems of ecological building’s standardization are structured, the compliance assessment form on stages of life cycle of a capital construction project is developed. The main indicators of level of ecological safety considering requirements of the international ISO standards 9000 and ISO 14000 and which are based on the basic principles of general quality management (TQM) are presented.

  8. Program Manager: The Journal of the Defense Systems Management College. Volume 15, Number 4, July-August 1986.

    DTIC Science & Technology

    1986-08-01

    Architect, troi systems, CAD CAM, and com- functional analysis , synthesis, and National Bureau of Standards, mon engineering data bases will be the trade...Recurrent analysis of a management these s h e m evolutionary chain of data processing problem combining real data and ponents of defense support system...at the Defense first constructed his support simulator Systems Management College, the by assembling appropriate analysis Data Storage and Retrieval

  9. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  10. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  11. Evaluation of Supply Chain Management Systems Used in Civil Engineering

    NASA Astrophysics Data System (ADS)

    Tomczak, Michał; Rzepecki, Łukasz

    2017-10-01

    One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.

  12. Development of patient-centric linguistically tailored psychoeducational messages to support nutrition and medication self-management in type 2 diabetes: a feasibility study

    PubMed Central

    Ellis, Rebecca J Bartlett; Connor, Ulla; Marshall, James

    2014-01-01

    Purpose This study evaluated the feasibility of developing linguistically tailored educational messages designed to match the linguistic styles of patients segmented into types with the Descriptor™, and to determine patient preferences for tailored or standard messages based on their segments. Patients and methods Twenty patients with type 2 diabetes (T2DM) were recruited from a diabetes health clinic. Participants were segmented using the Descriptor™, a language-based questionnaire, to identify patient types based on their control orientation (internal/external), agency (high/low), and affect (positive/negative), which are well studied constructs related to T2DM self-management. Two of the seven self-care behaviors described by the American Association of Diabetes Educators (healthy eating and taking medication) were used to develop standard messages and then linguistically tailored using features of the six different construct segment types of the Descriptor™. A subset of seven participants each provided feedback on their preference for standard or linguistically tailored messages; 12 comparisons between standard and tailored messages were made. Results Overall, the tailored messages were preferred to the standard messages. When the messages were matched to specific construct segment types, the tailored messages were preferred over the standard messages, although this was not statistically significant. Conclusion Linguistically tailoring messages based on construct segments is feasible. Furthermore, tailored messages were more often preferred over standard messages. This study provides some preliminary evidence for tailoring messages based on the linguistic features of control orientation, agency, and affect. The messages developed in this study should be tested in a larger more representative sample. The present study did not explore whether tailored messages were better understood. This research will serve as preliminary evidence to develop future studies with the ultimate goal to design intervention studies to investigate if linguistically tailoring communication within the context of patient education influences patient knowledge, motivation, and activation toward making healthy behavior changes in T2DM self-management. PMID:25336928

  13. Internet-Based Approaches to Building Stakeholder Networks for Conservation and Natural Resource Management

    EPA Science Inventory

    Social network analysis (SNA) is based on a conceptual network representation of social interactions and is an invaluable tool for conservation professionals to increase collaboration, improve information flow, and increase efficiency. We present two approaches to constructing i...

  14. Internet-Based Approaches to Building Stakeholder Networks for Conservation and Natural Resource Management.

    EPA Science Inventory

    Social network analysis (SNA) is based on a conceptual network representation of social interactions and is an invaluable tool for conservation professionals to increase collaboration, improve information flow, and increase efficiency. We present two approaches to constructing in...

  15. EAGLEView: A surface and grid generation program and its data management

    NASA Technical Reports Server (NTRS)

    Remotigue, M. G.; Hart, E. T.; Stokes, M. L.

    1992-01-01

    An old and proven grid generation code, the EAGLE grid generation package, is given an added dimension of a graphical interface and a real time data base manager. The Numerical Aerodynamic Simulation (NAS) Panel Library is used for the graphical user interface. Through the panels, EAGLEView constructs the EAGLE script command and sends it to EAGLE to be processed. After the object is created, the script is saved in a mini-buffer which can be edited and/or saved and reinterpreted. The graphical objects are set-up in a linked-list and can be selected or queried by pointing and clicking the mouse. The added graphical enhancement to the EAGLE system emphasizes the unique capability to construct field points around complex geometry and visualize the construction every step of the way.

  16. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  17. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  18. Research of home energy management system based on technology of PLC and ZigBee

    NASA Astrophysics Data System (ADS)

    Wei, Qi; Shen, Jiaojiao

    2015-12-01

    In view of the problem of saving effectively energy and energy management in home, this paper designs a home energy intelligent control system based on power line carrier communication and wireless ZigBee sensor networks. The system is based on ARM controller, power line carrier communication and wireless ZigBee sensor network as the terminal communication mode, and realizes the centralized and intelligent control of home appliances. Through the combination of these two technologies, the advantages of the two technologies complement each other, and provide a feasible plan for the construction of energy-efficient, intelligent home energy management system.

  19. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  20. Research on Chinese Intelligent Guanglianda in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Romanovich, Marina; Shi, Peiyu; Wang, Ziyue; Zhao, Liang; Gerasimova, Vera

    2018-03-01

    Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.

  1. Occupational health management system: A study of expatriate construction professionals.

    PubMed

    Chan, I Y S; Leung, M Y; Liu, A M M

    2016-08-01

    Due to its direct impact on the safety and function of organizations, occupational health has been a concern of the construction industry for many years. The inherent complexity of occupational health management presents challenges that make a systems approach essential. From a systems perspective, health is conceptualized as an emergent property of a system in which processes operating at the individual and organizational level are inextricably connected. Based on the fundamental behavior-to-performance-to-outcome (B-P-O) theory of industrial/organizational psychology, this study presents the development of an I-CB-HP-O (Input-Coping Behaviors-Health Performance-Outcomes) health management systems model spanning individual and organizational boundaries. The model is based on a survey of Hong Kong expatriate construction professionals working in Mainland China. Such professionals tend to be under considerable stress due not only to an adverse work environment with dynamic tasks, but also the need to confront the cross-cultural issues arising from expatriation. A questionnaire was designed based on 6 focus groups involving 44 participants, and followed by a pilot study. Of the 500 questionnaires distributed in the main study, 137 valid returns were received, giving a response rate of 27.4%. The data were analyzed using statistical techniques such as factor analysis, reliability testing, Pearson correlation analysis, multiple regression modeling, and structural equation modeling. Theories of coping behaviors and health performance tend to focus on the isolated causal effects of single factors and/or posits the model at single, individual level; while industrial practices on health management tend to focus on organizational policy and training. By developing the I-CB-HP-O health management system, incorporating individual, interpersonal, and organizational perspectives, this study bridges the gap between theory and practice while providing empirical support for a systems view of health management. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. It Cuts Both Ways: Workers, Management and the Construction of a "Community of Fate" on the Shop Floor in a Mexican Garment Factory

    ERIC Educational Resources Information Center

    Videla, Nancy Plankey

    2006-01-01

    Most studies of lean production are based on surveys of managers. This article examines the labor process under lean production at a high-end garment factory in Central Mexico through ethnographic research, consisting of nine months of work at the factory, and in-depth interviews with 25 managers and 26 workers. The author found that…

  3. Envisioning Science Environment Technology and Society

    NASA Astrophysics Data System (ADS)

    Maknun, J.; Busono, T.; Surasetja, I.

    2018-02-01

    Science Environment Technology and Society (SETS) approach helps students to connect science concept with the other aspects. This allows them to achieve a clearer depiction of how each concept is linked with the other concepts in SETS. Taking SETS into account will guide students to utilize science as a productive concept in inventing and developing technology, while minimizing its negative impacts on the environment and society. This article discusses the implementation of Sundanese local wisdoms, that can be found in the local stilt house (rumah panggung), in the Building Construction subject in vocational high school on Building Drawing Technique expertise. The stilt house structural system employs ties, pupurus joints, and wedges on its floor, wall, and truss frames, as well as its beams. This local knowledge was incorporated into the Building Construction learning program and applied on the following basic competences: applying wood’s specification and characteristics for building construction, managing wood’s specification and characteristics for building construction, analyzing building structure’s type and function based on their characteristics, reasoning building structure’s type and function based on their characteristics, categorizing wood construction works, and reasoning wood construction works. The research result is the Sundanese traditional-local-wisdom-based learning design of the Building Construction subject.

  4. Research on Livable Community Evaluation Based on GIS

    NASA Astrophysics Data System (ADS)

    Yin, Zhangcai; Wu, Yang; Jin, Zhanghaonan; Zhang, Xu

    2018-01-01

    Community is the basic unit of the city. Research on livable community could provide a bottom-up research path for the realization of livable city. Livability is the total factor affecting the quality of community life. In this paper, livable community evaluation indexes are evaluated based on GIS and fuzzy comprehensive evaluation method. Then the sum-index and sub-index of community livability are both calculated. And community livable evaluation index system is constructed based on the platform of GIS. This study provides theoretical support for the construction and management of livable communities, so as to guide the development and optimization of city.

  5. The Roles of Motivation and Coping Behaviours in Managing Stress: Qualitative Interview Study of Hong Kong Expatriate Construction Professionals in Mainland China.

    PubMed

    Chan, Isabelle Yee Shan; Leung, Mei-Yung; Liang, Qi

    2018-03-20

    Driven by fast-growing economies worldwide, the number of international construction projects is booming, and employing expatriates has inevitably become a strategy used by construction firms. However, stress arising from expatriate assignments can lead to early return, assignment failure, and staff turnover, causing in significant losses to an organisation. Extensive research has focused on the effectiveness of coping behaviours in relation to stress. However, studies investigating the antecedents of coping are rare. The limited studies to date tend to focus on content-based motivations (identifying what), instead of on how coping behaviours can be motivated in the stress management process (identifying how). Focus on expatriate construction professionals (ECPs) is further limited. Hence, this study aims to investigate from a process theory perspective the role of motivation in the stress management process. Using a qualitative interview study approach, involving 22 in-depth interviews, this study first identifies the content of motivation, coping behaviours, performance, and stress in the context of Hong Kong ECPs working on cross-cultural projects in China; it then unveils and explains the associations between the identified variables. Based on the results, stakeholders are recommended to review pre-departure training, so as to ensure that key elements such as personal awareness of stress (cognitive, affective, and physical), expectancies of coping strategies on stress (adaptive or maladaptive), and expectancies of the influence of stress on performance are covered.

  6. The Roles of Motivation and Coping Behaviours in Managing Stress: Qualitative Interview Study of Hong Kong Expatriate Construction Professionals in Mainland China

    PubMed Central

    Chan, Isabelle Yee Shan; Leung, Mei-yung; Liang, Qi

    2018-01-01

    Driven by fast-growing economies worldwide, the number of international construction projects is booming, and employing expatriates has inevitably become a strategy used by construction firms. However, stress arising from expatriate assignments can lead to early return, assignment failure, and staff turnover, causing in significant losses to an organisation. Extensive research has focused on the effectiveness of coping behaviours in relation to stress. However, studies investigating the antecedents of coping are rare. The limited studies to date tend to focus on content-based motivations (identifying what), instead of on how coping behaviours can be motivated in the stress management process (identifying how). Focus on expatriate construction professionals (ECPs) is further limited. Hence, this study aims to investigate from a process theory perspective the role of motivation in the stress management process. Using a qualitative interview study approach, involving 22 in-depth interviews, this study first identifies the content of motivation, coping behaviours, performance, and stress in the context of Hong Kong ECPs working on cross-cultural projects in China; it then unveils and explains the associations between the identified variables. Based on the results, stakeholders are recommended to review pre-departure training, so as to ensure that key elements such as personal awareness of stress (cognitive, affective, and physical), expectancies of coping strategies on stress (adaptive or maladaptive), and expectancies of the influence of stress on performance are covered. PMID:29558458

  7. Water quality and management of private drinking water wells in Pennsylvania.

    PubMed

    Swistock, Bryan R; Clemens, Stephanie; Sharpe, William E; Rummel, Shawn

    2013-01-01

    Pennsylvania has over three million rural residents using private water wells for drinking water supplies but is one of the few states that lack statewide water well construction or management standards. The study described in this article aimed to determine the prevalence and causes of common health-based pollutants in water wells and evaluate the need for regulatory management along with voluntary educational programs. Water samples were collected throughout Pennsylvania by Master Well Owner Network volunteers trained by Penn State Extension. Approximately 40% of the 701 water wells sampled failed at least one health-based drinking water standard. The prevalence of most water quality problems was similar to past studies although both lead and nitrate-N were reduced over the last 20 years. The authors' study suggests that statewide water well construction standards along with routine water testing and educational programs to assist water well owners would result in improved drinking water quality for private well owners in Pennsylvania.

  8. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  9. Construction of a menu-based system

    NASA Technical Reports Server (NTRS)

    Noonan, R. E.; Collins, W. R.

    1985-01-01

    The development of the user interface to a software code management system is discussed. The user interface was specified using a grammar and implemented using a LR parser generator. This was found to be an effective method for the rapid prototyping of a menu based system.

  10. Concept maps: A tool for knowledge management and synthesis in web-based conversational learning.

    PubMed

    Joshi, Ankur; Singh, Satendra; Jaswal, Shivani; Badyal, Dinesh Kumar; Singh, Tejinder

    2016-01-01

    Web-based conversational learning provides an opportunity for shared knowledge base creation through collaboration and collective wisdom extraction. Usually, the amount of generated information in such forums is very huge, multidimensional (in alignment with the desirable preconditions for constructivist knowledge creation), and sometimes, the nature of expected new information may not be anticipated in advance. Thus, concept maps (crafted from constructed data) as "process summary" tools may be a solution to improve critical thinking and learning by making connections between the facts or knowledge shared by the participants during online discussion This exploratory paper begins with the description of this innovation tried on a web-based interacting platform (email list management software), FAIMER-Listserv, and generated qualitative evidence through peer-feedback. This process description is further supported by a theoretical construct which shows how social constructivism (inclusive of autonomy and complexity) affects the conversational learning. The paper rationalizes the use of concept map as mid-summary tool for extracting information and further sense making out of this apparent intricacy.

  11. A dynamic programming-based particle swarm optimization algorithm for an inventory management problem under uncertainty

    NASA Astrophysics Data System (ADS)

    Xu, Jiuping; Zeng, Ziqiang; Han, Bernard; Lei, Xiao

    2013-07-01

    This article presents a dynamic programming-based particle swarm optimization (DP-based PSO) algorithm for solving an inventory management problem for large-scale construction projects under a fuzzy random environment. By taking into account the purchasing behaviour and strategy under rules of international bidding, a multi-objective fuzzy random dynamic programming model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform fuzzy random parameters into fuzzy variables that are subsequently defuzzified by using an expected value operator with optimistic-pessimistic index. The iterative nature of the authors' model motivates them to develop a DP-based PSO algorithm. More specifically, their approach treats the state variables as hidden parameters. This in turn eliminates many redundant feasibility checks during initialization and particle updates at each iteration. Results and sensitivity analysis are presented to highlight the performance of the authors' optimization method, which is very effective as compared to the standard PSO algorithm.

  12. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    NASA Astrophysics Data System (ADS)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  13. Group affiliation in self-management: support or threat to identity?

    PubMed

    Bossy, Dagmara; Knutsen, Ingrid Ruud; Rogers, Anne; Foss, Christina

    2017-02-01

    Self-management is considered important in chronic illness, and contemporary health policy recommends participation in support groups for individuals with chronic conditions. Although withdrawal from or non-participation in support groups is an important problem, there is limited knowledge about individuals' own motivation for participation in or withdrawal from self-management support groups. To investigate how individuals with type 2 diabetes perceive participation in group-based self-management support. This is a qualitative focus group study using a semi-structured interview guide. Sixteen participants diagnosed with type 2 diabetes were included in the study. Individuals with and without group affiliations were mixed in three focus groups to trigger discussions. In the analysis, reoccurring themes of engagement and discussions between participants were focused within a theoretical frame of institutional logic. The focus groups are seen as social spaces where participants construct identity. Both participation and non-participation in group-based self-management support are associated with dealing with the stigma of having type 2 diabetes. Negotiations contribute to constructing an illness dignity as a response to the logic of moral responsibility for the disease. Contemporary policy contributes to societal understandings of individuals with type 2 diabetes as morally inadequate. Our study shows that group-based self-management support may counteract blame and contribute in negotiations of identity for individuals with type 2 diabetes. This mechanism makes participation in groups beneficial for some but stigma inducing for others. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  14. Defense Base Realignment and Closure Military Construction Budget Data for Sheppard Air Force Base, Wichita Falls, Texas

    DTIC Science & Technology

    1995-06-23

    provides the results of the audit of one project, valued at $1.8 million, for the repair of roads on Sheppard Air Force Base, Wichita Falls, Texas. The ... audit also assessed the adequacy of the management control program as it applied to the audit objectives.

  15. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  16. Translations on USSR Political and Sociological Affairs No. 905.

    DTIC Science & Technology

    1978-11-16

    naivete. It is precisely this which some fans of political games of chance in the United States-- the very people who in recent years have managed to...1973, since the bloody scraps of the cultural revolution" the PRC has hardly managed to restore the economy to the 1958 level, Peking has managed to...34The party in economic construction both today and tomorrow has two bases. One of them is improvement of management of the economy. And the other

  17. What You Always Wanted to Know About Monitoring Naval Ship Construction but You Did Not Dare Ask.

    DTIC Science & Technology

    1990-06-01

    CONCEPTUAL DESIGN For the conceptual design of the management efforts, we quote the Principles of Management , as they were presented by Fayol (Ret. l:p...functional groups. The five basic principles of management theory are: Planning, Organizing, Staffing, Directing, and Controlling. These principles... Principles of Management , McGraw-Hill, 1978. 16. ibid. 70 17. ibid. 18. ibid. 19. ibid. 20. Wolfe, P.M., Cochran E.B., and Thompson, W.J., A BERTS- Based

  18. The Impact of Airport Performance towards Construction and Infrastructure Expansion in Indonesia

    NASA Astrophysics Data System (ADS)

    Laksono, T. D.; Kurniasih, N.; Hasyim, C.; Setiawan, M. I.; Ahmar, A. S.

    2018-01-01

    Development that is generated from airport areas includes construction and infrastructure development. This research reviews about how the implementation of material management in certain construction project and the relationship between development especially construction and infrastructure development with Airport Performance. The method that is used in this research is mixed method. The population in this research is 297 airports that are existed in Indonesia. From those 297 airports then it is chosen airports that have the most completed data about construction project and it is obtained 148 airports. Based on the coefficient correlation (R) test it is known that construction and infrastructure development has relatively strong relation with airport performance variable, but there are still other factors that influence construction and infrastructure development become bigger effect.

  19. Evolutionary Game Model Study of Construction Green Supply Chain Management under the Government Intervention

    NASA Astrophysics Data System (ADS)

    Xing, Yuanzhi; Deng, Xiaoyi

    2017-11-01

    The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.

  20. Design of material management system of mining group based on Hadoop

    NASA Astrophysics Data System (ADS)

    Xia, Zhiyuan; Tan, Zhuoying; Qi, Kuan; Li, Wen

    2018-01-01

    Under the background of persistent slowdown in mining market at present, improving the management level in mining group has become the key link to improve the economic benefit of the mine. According to the practical material management in mining group, three core components of Hadoop are applied: distributed file system HDFS, distributed computing framework Map/Reduce and distributed database HBase. Material management system of mining group based on Hadoop is constructed with the three core components of Hadoop and SSH framework technology. This system was found to strengthen collaboration between mining group and affiliated companies, and then the problems such as inefficient management, server pressure, hardware equipment performance deficiencies that exist in traditional mining material-management system are solved, and then mining group materials management is optimized, the cost of mining management is saved, the enterprise profit is increased.

  1. Information systems for material flow management in construction processes

    NASA Astrophysics Data System (ADS)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  3. Systems Science in Support of Total Quality Management,

    DTIC Science & Technology

    Quality Management (TQM). This paper bridges the gap between these two subjects to illustrate specific means by which systems science can begin to augment TQM. This construction is based upon the consideration of two topics. First, a brief introduction to systems science is provided. Second, systems science is applied through the concept of the Conant-Ashby

  4. Lessons Learned from Migrating to an Online Electronic Business Management Course

    ERIC Educational Resources Information Center

    Walstrom, Kent A.

    2014-01-01

    This article describes the lessons learned while migrating an Electronic Business Management course from traditional face-to-face delivery to online delivery across a six and a half year time frame. The course under review teaches students how to develop and construct a working information-based online business using free versions of online…

  5. Accessing a personalized bibliography with a searchable system on the World Wide Web

    Treesearch

    Malchus B. Baker; Daniel P. Huebner; Peter F. Ffolliott

    2000-01-01

    Researchers, educator's and land management personnel routinely construct bibliographies to assist them in managing publications that relate to their work. These personalized bibliographies are unique and valuable to others in the same discipline. This paper presents a computer data base system that provides users with the ability to search a bibliography through...

  6. Forest inventory and management-based visual preference models of southern pine stands

    Treesearch

    Victor A. Rudis; James H. Gramann; Edward J. Ruddell; Joanne M. Westphal

    1988-01-01

    Statistical models explaining students' ratings of photographs of within stand forest scenes were constructed for 99 forest inventory plots in east Texas pine and oak-pine forest types. Models with parameters that are sensitive to visual preference yet compatible with forest management and timber inventories are presented. The models suggest that the density of...

  7. Research on SaaS and Web Service Based Order Tracking

    NASA Astrophysics Data System (ADS)

    Jiang, Jianhua; Sheng, Buyun; Gong, Lixiong; Yang, Mingzhong

    To solve the order tracking of across enterprises in Dynamic Virtual Enterprise (DVE), a SaaS and web service based order tracking solution was designed by analyzing the order management process in DVE. To achieve the system, the SaaS based architecture of data management on order tasks manufacturing states was constructed, and the encapsulation method of transforming application system into web service was researched. Then the process of order tracking in the system was given out. Finally, the feasibility of this study was verified by the development of a prototype system.

  8. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    NASA Astrophysics Data System (ADS)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  9. Selective classification and quantification model of C&D waste from material resources consumed in residential building construction.

    PubMed

    Mercader-Moyano, Pilar; Ramírez-de-Arellano-Agudo, Antonio

    2013-05-01

    The unfortunate economic situation involving Spain and the European Union is, among other factors, the result of intensive construction activity over recent years. The excessive consumption of natural resources, together with the impact caused by the uncontrolled dumping of untreated C&D waste in illegal landfills have caused environmental pollution and a deterioration of the landscape. The objective of this research was to generate a selective classification and quantification model of C&D waste based on the material resources consumed in the construction of residential buildings, either new or renovated, namely the Conventional Constructive Model (CCM). A practical example carried out on ten residential buildings in Seville, Spain, enabled the identification and quantification of the C&D waste generated in their construction and the origin of the waste, in terms of the building material from which it originated and its impact for every m(2) constructed. This model enables other researchers to establish comparisons between the various improvements proposed for the minimization of the environmental impact produced by building a CCM, new corrective measures to be proposed in future policies that regulate the production and management of C&D waste generated in construction from the design stage to the completion of the construction process, and the establishment of sustainable management for C&D waste and for the selection of materials for the construction on projected or renovated buildings.

  10. IGMS Construction Grants Overview

    EPA Pesticide Factsheets

    The Integrated Grants Management System (IGMS) is a web-based system that contains information on the recipient of the grant, fellowship, cooperative agreement and interagency agreement, including the name of the entity accepting the award.

  11. Using Construction Management for Public and Institutional Facilities.

    ERIC Educational Resources Information Center

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  12. Analysis on Key Points of Construction and Management of Municipal Landscape Engineering

    NASA Astrophysics Data System (ADS)

    Liang, Mingxia; Fei, Cheng

    2018-02-01

    At present, China has made great efforts to promote the construction of ecological civilization and promote the development of ecological protection and environmental construction. It has important practical significance to maintain the ecological balance and environmental quality of our country. Especially with the gradual improvement in people’s awareness of environmental protection, so that the green of the city also put forward higher requirements at the same time with the rising of the level of urbanization. In the process of urban landscape construction, the rational planning of urban landscaping involves a lot of subject knowledge. In the green process, we should fully consider the system of urban development and construction in China, based on the design of urban development and long-term planning of the landscaping project. In addition, we must also consider the traditional layout of the city area and the physical and geographical situation and so on, to enhance the objective and scientific nature of urban landscape. Therefore, it is of great practical significance to ensure the quality of landscaping in the effective management of municipal landscape engineering.

  13. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    NASA Astrophysics Data System (ADS)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  14. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  15. Back-Up Generator Facility and Associated Project Environmental Assessment Dyess Air Force Base, Texas

    DTIC Science & Technology

    2007-07-01

    waste, or solid waste management would be expected with implementation of the no-action alternative. Soils and Water. Impacts to soils and water...resources would be negligible. Construction would disturb about 2.5 acres, but best management practices such as silt fencing and soil surface watering...Intergovernmental Coordination for Environmental Planning tpy U.S. tons per year United States IWMP Integrated Waste Management Plan USACE United States

  16. The construction of a public key infrastructure for healthcare information networks in Japan.

    PubMed

    Sakamoto, N

    2001-01-01

    The digital signature is a key technology in the forthcoming Internet society for electronic healthcare as well as for electronic commerce. Efficient exchanges of authorized information with a digital signature in healthcare information networks require a construction of a public key infrastructure (PKI). In order to introduce a PKI to healthcare information networks in Japan, we proposed a development of a user authentication system based on a PKI for user management, user authentication and privilege management of healthcare information systems. In this paper, we describe the design of the user authentication system and its implementation. The user authentication system provides a certification authority service and a privilege management service while it is comprised of a user authentication client and user authentication serves. It is designed on a basis of an X.509 PKI and is implemented with using OpenSSL and OpenLDAP. It was incorporated into the financial information management system for the national university hospitals and has been successfully working for about one year. The hospitals plan to use it as a user authentication method for their whole healthcare information systems. One implementation of the system is free to the national university hospitals with permission of the Japanese Ministry of Education, Culture, Sports, Science and Technology. Another implementation is open to the other healthcare institutes by support of the Medical Information System Development Center (MEDIS-DC). We are moving forward to a nation-wide construction of a PKI for healthcare information networks based on it.

  17. Selection of Construction Methods: A Knowledge-Based Approach

    PubMed Central

    Skibniewski, Miroslaw

    2013-01-01

    The appropriate selection of construction methods to be used during the execution of a construction project is a major determinant of high productivity, but sometimes this selection process is performed without the care and the systematic approach that it deserves, bringing negative consequences. This paper proposes a knowledge management approach that will enable the intelligent use of corporate experience and information and help to improve the selection of construction methods for a project. Then a knowledge-based system to support this decision-making process is proposed and described. To define and design the system, semistructured interviews were conducted within three construction companies with the purpose of studying the way that the method' selection process is carried out in practice and the knowledge associated with it. A prototype of a Construction Methods Knowledge System (CMKS) was developed and then validated with construction industry professionals. As a conclusion, the CMKS was perceived as a valuable tool for construction methods' selection, by helping companies to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The described benefits as provided by the system favor a better performance of construction projects. PMID:24453925

  18. Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework

    NASA Astrophysics Data System (ADS)

    Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.

    2016-08-01

    Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.

  19. Categorization of potential project cost overrun factors in construction industry

    NASA Astrophysics Data System (ADS)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  20. Fuel Crime Conceptualization through Specialization of Ontology for Investigation Management System

    NASA Astrophysics Data System (ADS)

    Cybulka, Jolanta

    We undertook the task of building the conceptual model of a particular economic offense, called "a fuel crime". This model is thought of as a part of a larger conceptualization, which comprises consensual semantics underlying the knowledge base of a system, aimed at supporting the teamwork of investigators of economic crimes. Because such a knowledge-based system represents a perspective on economic crimes, it should be carefully modeled. This can be done with the help of an expressive enough ontology. To achieve our goal we use the constructive descriptions and situations (c.DnS) design pattern, which enables us to construct an extensible, layered ontology in a top-down manner: c.DnS top layer is specialized by the reference ontology for investigation management system, that in turn, is specialized by the ontology of the fuel crime.

  1. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    PubMed

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  2. STUDY ON THE REDUCTION MEASURES OF ENVIRONMENTAL LOADS AT THE DESIGNING AND CONSTRUCTION STAGES OF THE RIVER WORKS

    NASA Astrophysics Data System (ADS)

    Ikeda, Tetsuya; Amano, Kunihiko; Kishida, Hiroyuki

    In the field of infrastructure construction including river works, construction materials such as concrete are used, and it needs to transport them for the long distance. Due to recent growth of public awareness on the environmental issues, it becomes more important to estimate and reduce the environmental loads brought by the infrastructure construction. In the infrastructure construction, it is necessary to take notice of carbon dioxide and waste materials as the broad-based and long-range environmental loads. On the other hand, it is necessary to conduct the quantitative evaluation on these environmental loads and to investigate the reduction measures by considering the actual situation of construction. Focusing on the river works, this paper estimates the cost of construction, the carbon dioxide emission and final disposal volume on the several alternative plans at the designing stage, compares the significance of different environmental loads by using the integrated factors of LIME2, and analyzes the effectiveness of reduction measures. It also establishes the reduction scenarios of the environmental loads, and analyzes the effectiveness compared to the base-line scenario in which the materials are newly extracted and produced. Based on the results, it establishes the procedure intending to reduce the environmental loads at the time of river planning and construction, which will be referentialized by river managers, construction consultants and constructors nationwide.

  3. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  4. TOPS On-Line: Automating the Construction and Maintenance of HTML Pages

    NASA Technical Reports Server (NTRS)

    Jones, Kennie H.

    1994-01-01

    After the Technology Opportunities Showcase (TOPS), in October, 1993, Langley Research Center's (LaRC) Information Systems Division (ISD) accepted the challenge to preserve the investment in information assembled in the TOPS exhibits by establishing a data base. Following the lead of several people at LaRC and others around the world, the HyperText Transport Protocol (HTTP) server and Mosaic were the obvious tools of choice for implementation. Initially, some TOPS exhibitors began the conventional approach of constructing HyperText Markup Language (HTML) pages of their exhibits as input to Mosaic. Considering the number of pages to construct, a better approach was conceived that would automate the construction of pages. This approach allowed completion of the data base construction in a shorter period of time using fewer resources than would have been possible with the conventional approach. It also provided flexibility for the maintenance and enhancement of the data base. Since that time, this approach has been used to automate construction of other HTML data bases. Through these experiences, it is concluded that the most effective use of the HTTP/Mosaic technology will require better tools and techniques for creating, maintaining and managing the HTML pages. The development and use of these tools and techniques are the subject of this document.

  5. An Overview of Total Quality Management (TQM) practice in Construction Sector

    NASA Astrophysics Data System (ADS)

    Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed

    2018-04-01

    In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.

  6. Laboratory complex for simulation of navigation signals of pseudosatellites

    NASA Astrophysics Data System (ADS)

    Ratushniak, V. N.; Gladyshev, A. B.; Sokolovskiy, A. V.; Mikhov, E. D.

    2018-05-01

    In the article, features of the organization, structure and questions of formation of navigation signals of pseudosatellites of the short - range navigation system based on the hardware-software complex National Instruments are considered. A software model that performs the formation and management of a pseudo-random sequence of a navigation signal and the formation and management of the format transmitted pseudosatellite navigation information is presented. The variant of constructing the transmitting equipment of the pseudosatellite base stations is provided.

  7. The Enhancement of Simulation Based Learning Exercises through Formalised Reflection, Focus Groups and Group Presentation

    ERIC Educational Resources Information Center

    Mawdesley, M.; Long, G.; Al-jibouri, S.; Scott, D.

    2011-01-01

    Computer based simulations and games can be useful tools in teaching aspects of construction project management that are not easily transmitted through traditional lecture based approaches. However, it can be difficult to quantify their utility and it is essential to ensure that students are achieving the learning outcomes required rather than…

  8. Constructing a Streaming Video-Based Learning Forum for Collaborative Learning

    ERIC Educational Resources Information Center

    Chang, Chih-Kai

    2004-01-01

    As web-based courses using videos have become popular in recent years, the issue of managing audio-visual aids has become pertinent. Generally, the contents of audio-visual aids may include a lecture, an interview, a report, or an experiment, which may be transformed into a streaming format capable of making the quality of Internet-based videos…

  9. Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

    DTIC Science & Technology

    2013-02-06

    Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These

  10. To the problem of ensuring stability of activities of construction companies engaged in high-rise building construction

    NASA Astrophysics Data System (ADS)

    Ivanov, Nikolay; Safe Aldeen, Ahmed

    2018-03-01

    Recently, more and more attention in scientific literature has been drawn to improving the sustainability of organization. The growth in the volume of high-rise construction in Russia makes the task of assessing and ensuring the sustainability of organizations and enterprises leading this type of construction very relevant. The article considers the approach to assessing the sustainability of the organization's activities in the context of functioning of quality management system (QMS). It puts forward the hypothesis that assessment of sustainability of an organization that has a real and efficient functioning quality management system can be based on the results of assessing the effectiveness of the QMS. The article describes in sufficient detail the sequence of actions to form a list of criteria for assessing the effectiveness of the QMS and sustainability of the organization, and to evaluate both characteristics on the basis of these criteria. For a clear interpretation of the results obtained, the authors use so-called petal diagrams. It suggests an original approach to their creation and analysis. Based on the results of the study, the authors conclude that in order to assess the sustainability of enterprises and organizations analysis of the dynamics of changes in the basic sustainability factors is mandatory.

  11. [Attributes of forest infrastructure].

    PubMed

    Gao, Jun-kai; Jin, Ying-shan

    2007-06-01

    This paper discussed the origin and evolution of the conception of ecological infrastructure, the understanding of international communities about the functions of forest, the important roles of forest in China' s economic development and ecological security, and the situations and challenges to the ongoing forestry ecological restoration programs. It was suggested that forest should be defined as an essential infrastructure for national economic and social development in a modern society. The critical functions of forest infrastructure played in the transition of forestry ecological development were emphasized. Based on the synthesis of forest ecosystem features, it was considered that the attributes of forest infrastructure are distinctive, due to the fact that it is constructed by living biological material and diversified in ownership. The forestry ecological restoration program should not only follow the basic principles of infrastructural construction, but also take the special characteristics of forests into consideration in studying the managerial system of the programs. Some suggestions for the ongoing programs were put forward: 1) developing a modern concept of ecosystem where man and nature in harmony is the core, 2) formulating long-term stable investments for forestry ecological restoration programs, 3) implementing forestry ecological restoration programs based on infrastructure construction principles, and 4) managing forests according to the principles of infrastructural construction management.

  12. Digital waterway construction based on inland electronic navigation chart

    NASA Astrophysics Data System (ADS)

    Wang, Xue; Pan, Junfeng; Zhu, Weiwei

    2015-12-01

    With advantages of large capacity, long distance, low energy consumption, low cost, less land occupation and light pollution, inland waterway transportation becomes one of the most important constituents of the comprehensive transportation system and comprehensive water resources utilization in China. As one of "three elements" of navigation, waterway is the important basis for the development of water transportation and plays a key supporting role in shipping economic. The paper discuss how to realize the informatization and digitization of waterway management based on constructing an integrated system of standard inland electronic navigation chart production, waterway maintenance, navigation mark remote sensing and control, ship dynamic management, and water level remote sensing and report, which can also be the foundation of the intelligent waterway construction. Digital waterway construction is an information project and also has a practical meaning for waterway. It can not only meet the growing high assurance and security requirements for waterway, but also play a significant advantage in improving transport efficiency, reducing costs, promoting energy conservation and so on. This study lays a solid foundation on realizing intelligent waterway and building a smooth, efficient, safe, green modern inland waterway system, and must be considered as an unavoidable problem for the coordinated development between "low carbon" transportation and social economic.

  13. A relational data-knowledge base system and its potential in developing a distributed data-knowledge system

    NASA Technical Reports Server (NTRS)

    Rahimian, Eric N.; Graves, Sara J.

    1988-01-01

    A new approach used in constructing a rational data knowledge base system is described. The relational database is well suited for distribution due to its property of allowing data fragmentation and fragmentation transparency. An example is formulated of a simple relational data knowledge base which may be generalized for use in developing a relational distributed data knowledge base system. The efficiency and ease of application of such a data knowledge base management system is briefly discussed. Also discussed are the potentials of the developed model for sharing the data knowledge base as well as the possible areas of difficulty in implementing the relational data knowledge base management system.

  14. Setting up a Low-Cost Lab Management System for a Multi-Purpose Computing Laboratory Using Virtualisation Technology

    ERIC Educational Resources Information Center

    Mok, Heng Ngee; Lee, Yeow Leong; Tan, Wee Kiat

    2012-01-01

    This paper describes how a generic computer laboratory equipped with 52 workstations is set up for teaching IT-related courses and other general purpose usage. The authors have successfully constructed a lab management system based on decentralised, client-side software virtualisation technology using Linux and free software tools from VMware that…

  15. Construction of IT Based Learning System at University Level

    NASA Astrophysics Data System (ADS)

    Akiyama, Hidenori; Kozono, Kazutake

    Rapid progress of information and communication technologies has been changing the education method. In Japan, online lectures have been recognized as the credits for graduation by the change of a law since 2001. One trial to construct an IT based learning system has been done for the development of IT based higher education and training. Educational effect of online lecture taken anytime and anywhere is evaluated, and then an authoring software for online lectures is developed for educators who are not familiar to IT. A learning management system begins to be operated for whole lectures, and a wireless LAN system is equipped in whole campus of Kumamoto University.

  16. A Novel Quantitative Approach to Concept Analysis: The Internomological Network

    PubMed Central

    Cook, Paul F.; Larsen, Kai R.; Sakraida, Teresa J.; Pedro, Leli

    2012-01-01

    Background When a construct such as patients’ transition to self-management of chronic illness is studied by researchers across multiple disciplines, the meaning of key terms can become confused. This results from inherent problems in language where a term can have multiple meanings (polysemy) and different words can mean the same thing (synonymy). Objectives To test a novel quantitative method for clarifying the meaning of constructs by examining the similarity of published contexts in which they are used. Method Published terms related to the concept transition to self-management of chronic illness were analyzed using the internomological network (INN), a type of latent semantic analysis to calculate the mathematical relationships between constructs based on the contexts in which researchers use each term. This novel approach was tested by comparing results to those from concept analysis, a best-practice qualitative approach to clarifying meanings of terms. By comparing results of the two methods, the best synonyms of transition to self-management, as well as key antecedent, attribute, and consequence terms, were identified. Results Results from INN analysis were consistent with those from concept analysis. The potential synonyms self-management, transition, and adaptation had the greatest utility. Adaptation was the clearest overall synonym, but had lower cross-disciplinary use. The terms coping and readiness had more circumscribed meanings. The INN analysis confirmed key features of transition to self-management, and suggested related concepts not found by the previous review. Discussion The INN analysis is a promising novel methodology that allows researchers to quantify the semantic relationships between constructs. The method works across disciplinary boundaries, and may help to integrate the diverse literature on self-management of chronic illness. PMID:22592387

  17. EPA Permeable Surface Research - Poster

    EPA Science Inventory

    EPA recognizes permeable surfaces as an effective post-construction infiltration-based Best Management Practice to mitigate the adverse effects of stormwater runoff. The professional user community conceptually embraces permeable surfaces as a tool for making runoff more closely...

  18. EPA Permeable Surface Research

    EPA Science Inventory

    EPA recognizes permeable surfaces as an effective post-construction infiltration-based Best Management Practice to mitigate the adverse effects of stormwater runoff. The professional user community conceptually embraces permeable surfaces as a tool for making runoff more closely...

  19. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  20. [Geertz' Interpretive Theory and care management: visualizing nurses' social practice].

    PubMed

    Prochnow, Adelina Giacomelli; Leite, Joséte Luzia; Erdmann, Alacoque Lorenzini

    2005-01-01

    This paper presents a theoretical reflection on hospital nursing care management and Geertz' Interpretive Theory of Culture. We discuss some significant elements of culture in management, based on the theoretical reference frameworks of nursing, administration and anthropology. In these, the importance of cultural diversity is highlighted as an innovative resource to expand the vision of human integrity, valuing divergences, respect and sharing, which are important for nurses in the construction of their social practice.

  1. [Management of the new first aid service at enterprises and construction sites].

    PubMed

    Prandi, E; Cantoni, S; Mosconi, G

    2006-01-01

    First aid at work organization and management represents a complex and critical aspect of the manifold problems of hygiene and security at work; nevertheless, even in relatively well organized productions, these themes are often neglected, if not completely ignored. In this work the authors analize the laws which regulate the correct first aid at work organization and management and an approach to the problem based on the preliminary risk assessment is suggested.

  2. Construction Management.

    ERIC Educational Resources Information Center

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  3. [Measuring water ecological carrying capacity with the ecosystem-service-based ecological footprint (ESEF) method: Theory, models and application].

    PubMed

    Jiao, Wen-jun; Min, Qing-wen; Li, Wen-hua; Fuller, Anthony M

    2015-04-01

    Integrated watershed management based on aquatic ecosystems has been increasingly acknowledged. Such a change in the philosophy of water environment management requires recognizing the carrying capacity of aquatic ecosystems for human society from a more general perspective. The concept of the water ecological carrying capacity is therefore put forward, which considers both water resources and water environment, connects socio-economic development to aquatic ecosystems and provides strong support for integrated watershed management. In this paper, the authors proposed an ESEF-based measure of water ecological carrying capacity and constructed ESEF-based models of water ecological footprint and capacity, aiming to evaluate water ecological carrying capacity with footprint methods. A regional model of Taihu Lake Basin was constructed and applied to evaluate the water ecological carrying capacity in Changzhou City which located in the upper reaches of the basin. Results showed that human demand for water ecosystem services in this city had exceeded the supply capacity of local aquatic ecosystems and the significant gap between demand and supply had jeopardized the sustainability of local aquatic ecosystems. Considering aqua-product provision, water supply and pollutant absorption in an integrated way, the scale of population and economy aquatic ecosystems in Changzhou could bear only 54% of the current status.

  4. Predictors of Self-care among the Elderly with Diabetes Type 2: Using Social Cognitive Theory.

    PubMed

    Borhaninejad, Vahidreza; Iranpour, Abedin; Shati, Mohsen; Tahami, Ahmad Naghibzadeh; Yousefzadeh, Gholamrezan; Fadayevatan, Reza

    Diabetes is one of the most common chronic diseases among the elderly and is also a very serious health problem. Adopting theory-based self-care behaviors is an effective means in managing such diseases. This study aimed to determine the predictors of diabetes self-care in the elderly in Kerman based on a social cognitive theory. In this cross-sectional study, 384 elderly diabetic patients who had referred to health screening centers in Kerman were chosen via cluster sampling. To collect information about self-care and its predictors, Toobert Glasgow's diabetes self-efficacy scale as well as a questionnaire was used which was based on social cognitive theory constructs. The validity and reliability of the questionnaire was confirmed. The data were analyzed using Pearson correlation and linear regression analysis in SPSS software 17. Among the subjects, 67.37% (252) had poor self-care ability; 29.14% (109) had average ability, and 3.40% (13) enjoyed a proper level of self- care ability. There was a significant relationship between the constructs of the social cognitive theory (knowledge, self- efficacy, social support, outcome expectations, outcome expectancy and self-regulation) and the self-care score. Furthermore, the mentioned constructs could predict 0.47% of the variance of the self-care behaviors. self-care behaviors in this study were poor. Therefore, it is necessary to develop an educational intervention based on cognitive theory constructs with the goal of properly managing diabetes in the elderly patients. Copyright © 2016 Diabetes India. Published by Elsevier Ltd. All rights reserved.

  5. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  6. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  7. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  8. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  9. 28 CFR 91.22 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...

  10. 28 CFR 91.22 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...

  11. 28 CFR 91.22 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...

  12. 28 CFR 91.22 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...

  13. 28 CFR 91.22 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...

  14. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  15. Exploring readiness for the adoption of new molecular water quality tests: Insights from interviews with policy makers, laboratory managers and watershed managers.

    PubMed

    Henrich, Natalie; Holmes, Bev; Isaac-Renton, Judith; Prystajecky, Natalie

    2016-01-01

    Adoption of molecular-based water quality tests has been limited despite their advantage over traditional culture-based tests. A better understanding of the factors affecting adoption of these tests is needed for effective implementation. The Consolidated Framework for Implementation Research (CFIR) was used to analyze interviews with policy makers, watershed managers and laboratory managers in British Columbia (BC), Canada about their perceptions of molecular water tests currently under development in order to assess readiness for adoption and identify factors that may impact implementation. Many of the CFIR constructs were addressed by study participants, thus confirming their validity in the water-testing context. Other constructs were not mentioned, which suggests that awareness about these constructs need to be increased to ensure that they are incorporated into implementation strategies. In general, there was much enthusiasm for the new tests, which were seen to provide valuable information that could enable improved management of watersheds and treatment of source water. However, prior to adopting the tests, stakeholders would require evidence supporting the tests' validity and reliability, would need to assess the complexity of introducing the tests into laboratories and water sampling processes, and would require support interpreting the test results. Even if all the aforementioned issues are satisfactorily addressed, the tests may not be adopted unless regulations and policies were changed to allow the use of these test results to inform decision making. The results support that implementation of new technologies, such as these water quality tests, need to address potential barriers that could hinder uptake despite the advantages of the new product. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. A bootstrap lunar base: Preliminary design review 2

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A bootstrap lunar base is the gateway to manned solar system exploration and requires new ideas and new designs on the cutting edge of technology. A preliminary design for a Bootstrap Lunar Base, the second provided by this contractor, is presented. An overview of the work completed is discussed as well as the technical, management, and cost strategies to complete the program requirements. The lunar base design stresses the transforming capabilities of its lander vehicles to aid in base construction. The design also emphasizes modularity and expandability in the base configuration to support the long-term goals of scientific research and profitable lunar resource exploitation. To successfully construct, develop, and inhabit a permanent lunar base, however, several technological advancements must first be realized. Some of these technological advancements are also discussed.

  17. On the Supply Chain Management Supported by E-Commerce Service Platform for Agreement based Circulation of Fruits and Vegetables

    NASA Astrophysics Data System (ADS)

    Bao, Liwei; Huang, Yuchi; Ma, Zengjun; Zhang, Jie; Lv, Qingchu

    According to analysis of the supply chain process of agricultural products, the IT application requirements of the market entities participating in the agreement based circulation of fruits and vegetables have been discussed. The strategy of supply chain management basing on E-commerce service platform for fruits and vegetables has been proposed in this paper. The architecture and function composing of the service platform have been designed and implemented. The platform is constructed on a set of application service modules User can choose some of the application service modules and define them according to the business process. The application service modules chosen and defined by user are integrated as an application service package and applied as management information system of business process. With the E-commerce service platform, the supply chain management for agreement based circulation of agricultural products of vegetables and fruits can be implemented.

  18. Environmental Baseline Survey, Real Property Transaction Between Nellis Air Force Base and the City of North Las Vegas for Construction of a Wastewater Treatment Facility, Clark County, Nevada. Phase 1

    DTIC Science & Technology

    2007-12-06

    established action levels characterized pursuant to the Environmental Restoration Program (ERP) that is managed by the Restoration Program Manager (RPM) of...interviews are presented in Appendix E. Mr. D.J. Haarklau, 99 CES/CEVC, Environmental POLs Program Manager Mr. Haarklau provided GSRC with...Program Manager for 10 years, and according to a records search, no reportable spills have occurred within or in the vicinity of the subject property. He

  19. Phase 1 Environmental Baseline Survey for Construction of a Solar Photovoltaic System by NV Energy on Nellis Air Force Base, Clark County, Nevada

    DTIC Science & Technology

    2011-01-01

    is managed by the Restoration Program Manager (RPM) of the 99 CES/CEVR. Category 4 – Remedial action required and taken. Property where...Restoration Program Manager Mr. Waldo Pulido was contacted at his office, and he stated that he was not aware of any hazardous materials storage or...Site LF-01 and Site ST-27. Mr. Henry Rodriguez, 99 CES/CEANQ, Toxics Program Manager Mr. Henry Rodriguez was contacted at his office in 2009 as

  20. Toward information management in corporations (2)

    NASA Astrophysics Data System (ADS)

    Shibata, Mitsuru

    If construction of inhouse information management systems in an advanced information society should be positioned along with the social information management, its base making begins with reviewing current paper filing systems. Since the problems which inhere in inhouse information management systems utilizing OA equipments also inhere in paper filing systems, the first step toward full scale inhouse information management should be to grasp and solve the fundamental problems in current filing systems. This paper describes analysis of fundamental problems in filing systems, making new type of offices and analysis of improvement needs in filing systems, and some points in improving filing systems.

  1. An ethical framework for pharmacy management: balancing autonomy and other principles.

    PubMed

    Glassman, Peter A; Schneider, Paul L; Good, Chester B

    2014-04-01

    Decisions to control pharmaceutical costs can cause conflicts as to what medications are covered. Such conflicts have ethical implications, however implicit, and given this fact, an ethical framework can help address them. In the following commentary, we discuss the more traditional, individual-level ethical considerations likely familiar to most clinicians. We, then, discuss population-level ethical constructs that clinicians may not as readily embrace. We also present a hypothetical cancer-care case to illustrate how imbalances in ethical foci between individual- and population-level constructs may lead to conflicts among health care actors and promote shifts in pharmaceutical decision making away from providers and toward payers, paradoxically reducing provider autonomy and hence patient autonomy. Finally, we propose a more comprehensive ethical framework to help converge individual, payer, and societal interests when making pharmaceutical use decisions. Pharmacists play a crucial role as pharmacy benefits managers and should be familiar with individual- and population-based ethical constructs.

  2. Urinary lithiasis in civil construction workers as a management indicator for health and improvement in personnel.

    PubMed

    Ferraz, Renato Ribeiro Nogueira; Aquino, Simone

    2014-12-01

    Empirical information provided by health care professionals acting in the first line of care report a constant increase in the number of civil construction workers that present painful acute conditions, in most cases associated with the existence of urinary tract calculi. Evaluating the prevalence of urinary lithiasis in civil construction workers, as a means to identify indicators for the management of health and personnel. Observational study based on directed questionnaire. From the 94 participants, 18 (19%) were lithiasic, mostly due to overweight and reduced fluid intake. The observed prevalence appeared to be two times greater than that of the general population. Thus, prevention for such condition gains relevance, in order to avoid discomfort for the worker, and also reduce costs due to absenteeism, improving productivity, benefiting the workers by performance and creating the perspective of an improved quality of life.

  3. Biological effect of low-head sea lamprey barriers: Designs for extensive surveys and the value of incorporating intensive process-oriented research

    USGS Publications Warehouse

    Hayes, D.B.; Baylis, J.R.; Carl, L.M.; Dodd, H.R.; Goldstein, J.D.; McLaughlin, R.L.; Noakes, D.L.G.; Porto, L.M.

    2003-01-01

    Four sampling designs for quantifying the effect of low-head sea lamprey (Petromyzon marinus) barriers on fish communities were evaluated, and the contribution of process-oriented research to the overall confidence of results obtained was discussed. The designs include: (1) sample barrier streams post-construction; (2) sample barrier and reference streams post-construction; (3) sample barrier streams pre- and post-construction; and (4) sample barrier and reference streams pre- and post-construction. In the statistical literature, the principal basis for comparison of sampling designs is generally the precision achieved by each design. In addition to precision, designs should be compared based on the interpretability of results and on the scale to which the results apply. Using data collected in a broad survey of streams with and without sea lamprey barriers, some of the tradeoffs that occur among precision, scale, and interpretability are illustrated. Although circumstances such as funding and availability of pre-construction data may limit which design can be implemented, a pre/post-construction design including barrier and reference streams provides the most meaningful information for use in barrier management decisions. Where it is not feasible to obtain pre-construction data, a design including reference streams is important to maintain the interpretability of results. Regardless of the design used, process-oriented research provides a framework for interpreting results obtained in broad surveys. As such, information from both extensive surveys and intensive process-oriented research provides the best basis for fishery management actions, and gives researchers and managers the most confidence in the conclusions reached regarding the effects of sea lamprey barriers.

  4. The dynamic financial distress prediction method of EBW-VSTW-SVM

    NASA Astrophysics Data System (ADS)

    Sun, Jie; Li, Hui; Chang, Pei-Chann; He, Kai-Yu

    2016-07-01

    Financial distress prediction (FDP) takes important role in corporate financial risk management. Most of former researches in this field tried to construct effective static FDP (SFDP) models that are difficult to be embedded into enterprise information systems, because they are based on horizontal data-sets collected outside the modelling enterprise by defining the financial distress as the absolute conditions such as bankruptcy or insolvency. This paper attempts to propose an approach for dynamic evaluation and prediction of financial distress based on the entropy-based weighting (EBW), the support vector machine (SVM) and an enterprise's vertical sliding time window (VSTW). The dynamic FDP (DFDP) method is named EBW-VSTW-SVM, which keeps updating the FDP model dynamically with time goes on and only needs the historic financial data of the modelling enterprise itself and thus is easier to be embedded into enterprise information systems. The DFDP method of EBW-VSTW-SVM consists of four steps, namely evaluation of vertical relative financial distress (VRFD) based on EBW, construction of training data-set for DFDP modelling according to VSTW, training of DFDP model based on SVM and DFDP for the future time point. We carry out case studies for two listed pharmaceutical companies and experimental analysis for some other companies to simulate the sliding of enterprise vertical time window. The results indicated that the proposed approach was feasible and efficient to help managers improve corporate financial management.

  5. Electronic construction collaboration system -- phase II.

    DOT National Transportation Integrated Search

    2010-06-01

    During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) : and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom d...

  6. Electronic construction collaboration system : phase III.

    DOT National Transportation Integrated Search

    2011-12-01

    This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...

  7. Optimizing construction quality management of pavements using mechanistic performance analysis.

    DOT National Transportation Integrated Search

    2004-08-01

    This report presents a statistical-based algorithm that was developed to reconcile the results from several pavement performance models used in the state of practice with systematic process control techniques. These algorithms identify project-specif...

  8. Comprehensive Anti-error Study on Power Grid Dispatching Based on Regional Regulation and Integration

    NASA Astrophysics Data System (ADS)

    Zhang, Yunju; Chen, Zhongyi; Guo, Ming; Lin, Shunsheng; Yan, Yinyang

    2018-01-01

    With the large capacity of the power system, the development trend of the large unit and the high voltage, the scheduling operation is becoming more frequent and complicated, and the probability of operation error increases. This paper aims at the problem of the lack of anti-error function, single scheduling function and low working efficiency for technical support system in regional regulation and integration, the integrated construction of the error prevention of the integrated architecture of the system of dispatching anti - error of dispatching anti - error of power network based on cloud computing has been proposed. Integrated system of error prevention of Energy Management System, EMS, and Operation Management System, OMS have been constructed either. The system architecture has good scalability and adaptability, which can improve the computational efficiency, reduce the cost of system operation and maintenance, enhance the ability of regional regulation and anti-error checking with broad development prospects.

  9. Linking Effective Project Management to Business Strategy in Oil and Gas Industry through Decision-making Processes

    NASA Astrophysics Data System (ADS)

    Adeleke, Adeyinka

    The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to the decision-making process. Some recommendations for future studies were presented based on the need to intensify the importance of the current study and enlarge the body of knowledge regarding decision-making process in oil and gas industry.

  10. [Talking about the discipline construction and development of burn from five ideas].

    PubMed

    Guo, G H

    2018-03-20

    Discipline construction is an important aspect of hospital modernization management and construction. The level of medical treatment, education, and scientific research could be assured and improved through discipline construction, which could speed up the talent training, promote science and technology innovation, and realize the sustainable development of hospital. At present, most of the hospital management models adopt the two ranks of the hospital and department. The manager of a department must grasp medical treatment, education, scientific research, and discipline construction steadily. The author talks about the discipline construction and development of burn from " five ideas" for the readers.

  11. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    PubMed Central

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176

  12. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    PubMed

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  13. Development of a lifetime merit-based selection index for US dairy grazing systems

    USDA-ARS?s Scientific Manuscript database

    Pasture-based dairy producers in the US face costs, revenues and management challenges that differ from those associated with conventional dairy production systems. Three Grazing Merit indexes (GM$1, GM$2, and GM$3), parallel to the US Lifetime Net Merit (NM$) index, were constructed using economic ...

  14. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  15. Risk-based approach in valuation of workplace injury rate for transportation and construction industry

    NASA Astrophysics Data System (ADS)

    Pykhtin, Kirill; Simankina, Tatiana; Sharmanov, Vladimir; Kopytova, Anna

    2017-10-01

    The danger of injuries and accidents in various industries such as transportation and construction urges the government to control the occupational health and safety more strictly. However, in order to do so with the minimal costs modern risk management tools, have to be implemented. Risk-based approach is an essential tool for competent risk- assessment and used in a great variety of other countries, demonstrating great results in providing of safe working environment. The article describes the problems that the implementation of the method faces in Russia and suggests certain ways to resolve them.

  16. Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.

    ERIC Educational Resources Information Center

    Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.

    2002-01-01

    Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…

  17. Costs and Outcomes over 36 Years of Patients with Phenylketonuria Who Do and Do Not Remain on a Phenylalanine-Restricted Diet

    ERIC Educational Resources Information Center

    Guest, J. F.; Bai, J. J.; Taylor, R. R.; Sladkevicius, E.; Lee, P. J.; Lachmann, R. H.

    2013-01-01

    Background: To quantify the costs and consequences of managing phenylketonuria (PKU) in the UK and to estimate the potential implications to the UK's National Health Service (NHS) of keeping patients on a phenylalanine-restricted diet for life. Methods: A computer-based model was constructed depicting the management of PKU patients over the first…

  18. A Case-Based Exploration of Task/Technology Fit in a Knowledge Management Context

    DTIC Science & Technology

    2008-03-01

    have a difficult time articulating to others. Researchers who subscribe to the constructionist perspective view knowledge as an inherently social ...Acceptance Model With Task-Technology Fit Constructs. Information & Management, 36, 9-21. Dooley, D. (2001). Social Research Methods (4th ed.). Upper...L. (2006). Social Research Methods : Qualitative and Quantitative Approaches (6 ed.). Boston: Pearson Education, Inc. Nonaka, I. (1994). A Dynamic

  19. Patient satisfaction constructs.

    PubMed

    Rahman, Muhammad Sabbir; Osmangani, Aahad M

    2015-01-01

    The purpose of this paper is to examine the five-factor structure of patients' satisfaction constructs toward private healthcare service providers. This research is a cross-sectional study. A questionnaire-based survey was conducted with previous and current Bangladeshi patients. Exploratory factor analysis was employed to extract the underlying constructs. Five underlying dimensions that play a significant role in structuring the satisfaction perceived by Bangladeshi private healthcare patients are identified in this study. Practical implications - The main contribution of this study is identifying the dimensions of satisfaction perceived by Bangladeshi patients regarding private healthcare service providers. Healthcare managers adopt the five identified underlying construct items in their business practices to improve their respective healthcare efficiency while ensuring overall customer satisfaction.

  20. Analysis of noise on construction sites of high-rise buildings.

    PubMed

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  1. Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

    PubMed Central

    Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns. PMID:25114958

  2. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    PubMed

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  3. The Large Synoptic Survey Telescope (LSST) Camera

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Ranked as the top ground-based national priority for the field for the current decade, LSST is currently under construction in Chile. The U.S. Department of Energy’s SLAC National Accelerator Laboratory is leading the construction of the LSST camera – the largest digital camera ever built for astronomy. SLAC Professor Steven M. Kahn is the overall Director of the LSST project, and SLAC personnel are also participating in the data management. The National Science Foundation is the lead agency for construction of the LSST. Additional financial support comes from the Department of Energy and private funding raised by the LSST Corporation.

  4. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  5. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  6. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  7. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  8. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  9. [Risk communication in construction of new nuclear power plant].

    PubMed

    He, Gui-Zhen; Lü, Yong-Long

    2013-03-01

    Accompanied by construction of new nuclear power plants in the coming decades in China, risk management has become increasingly politicized and contentious. Nuclear risk communication is a critical component in helping individuals prepare for, respond to, and recover from nuclear power emergencies. It was discussed that awareness of trust and public attitudes are important determinants in nuclear power risk communication and management. However, there is limited knowledge about how to best communicate with at-risk populations around nuclear power plant in China. To bridge this gap, this study presented the attitudinal data from a field survey in under-building Haiyang nuclear power plant, Shandong Province to measure public support for and opposition to the local construction of nuclear power plant. The paper discussed the structure of the communication process from a descriptive point of view, recognizing the importance of trust and understanding the information openness. The results showed that decision-making on nuclear power was dominated by a closed "iron nuclear triangle" of national governmental agencies, state-owned nuclear enterprises and scientific experts. Public participation and public access to information on nuclear constructions and assessments have been marginal and media was a key information source. As information on nuclear power and related risks is very restricted in China, Chinese citizens (51%) tend to choose the government as the most trustworthy source. More respondents took the negative attitudes toward nuclear power plant construction around home. It drew on studies about risk communication to develop some guidelines for successful risk communication. The conclusions have vast implications for how we approach risk management in the future. The findings should be of interest to state and local emergency managers, community-based organizations, public health researchers, and policy makers.

  10. High-rise construction in the Russian economy: modeling of management decisions

    NASA Astrophysics Data System (ADS)

    Miroshnikova, Tatyana; Taskaeva, Natalia

    2018-03-01

    The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.

  11. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  12. Development and initial validation of primary care provider mental illness management and team-based care self-efficacy scales.

    PubMed

    Loeb, Danielle F; Crane, Lori A; Leister, Erin; Bayliss, Elizabeth A; Ludman, Evette; Binswanger, Ingrid A; Kline, Danielle M; Smith, Meredith; deGruy, Frank V; Nease, Donald E; Dickinson, L Miriam

    Develop and validate self-efficacy scales for primary care provider (PCP) mental illness management and team-based care participation. We developed three self-efficacy scales: team-based care (TBC), mental illness management (MIM), and chronic medical illness (CMI). We developed the scales using Bandura's Social Cognitive Theory as a guide. The survey instrument included items from previously validated scales on team-based care and mental illness management. We administered a mail survey to 900 randomly selected Colorado physicians. We conducted exploratory principal factor analysis with oblique rotation. We constructed self-efficacy scales and calculated standardized Cronbach's alpha coefficients to test internal consistency. We calculated correlation coefficients between the MIM and TBC scales and previously validated measures related to each scale to evaluate convergent validity. We tested correlations between the TBC and the measures expected to correlate with the MIM scale and vice versa to evaluate discriminant validity. PCPs (n=402, response rate=49%) from diverse practice settings completed surveys. Items grouped into factors as expected. Cronbach's alphas were 0.94, 0.88, and 0.83 for TBC, MIM, and CMI scales respectively. In convergent validity testing, the TBC scale was correlated as predicted with scales assessing communications strategies, attitudes toward teams, and other teamwork indicators (r=0.25 to 0.40, all statistically significant). Likewise, the MIM scale was significantly correlated with several items about knowledge and experience managing mental illness (r=0.24 to 41, all statistically significant). As expected in discriminant validity testing, the TBC scale had only very weak correlations with the mental illness knowledge and experience managing mental illness items (r=0.03 to 0.12). Likewise, the MIM scale was only weakly correlated with measures of team-based care (r=0.09 to.17). This validation study of MIM and TBC self-efficacy scales showed high internal validity and good construct validity. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. Barriers of lean construction implementation in the Moroccan construction industry

    NASA Astrophysics Data System (ADS)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  14. Concrete debris assessment for road construction activities : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Two distinct but related issues of importance to FDOT were investigated: (1) the possible impact of : recycled concrete aggregate (RCA) used as road base on the subsurface environment and (2) the : management of concrete grinding residuals (CGR) resu...

  15. Infrastructure and adaptive management in an eco-hydrological Delta: Lessons learned from design and construction of the Haringvliet Sluices

    NASA Astrophysics Data System (ADS)

    Linsen, Max; Mostert, Erik; van der Zaag, Pieter

    2015-04-01

    Consequences of climate change include an increase in extreme weather events in North-West Europe. The Netherlands is directly affected by these extreme events, in particular in water management practices. Large investments in infrastructure were made ever since the floods of 1953, leading to a higher level of protection against flooding from the sea and to a managed eco-hydrological Delta. Adaptive water management is presented as an approach to deal with challenges in water allocation and flood protection. One challenge to adaptive water management relates to infrastructure. Large works are often inevitable and essential in flood protection. Hydraulic infrastructure however tends to be inflexible by nature and requires a level of robustness to deliver the desired performance over time. In this study, we focus on the relation between desired performance of infrastructure and adaptation to environmental change and evolving social demands. The objective of this study is to gain an understanding of the evolution of the desired performance of water management infrastructure. This serves two purposes: an increased understanding of design and construction of existing infrastructure, and potential lessons learned for future hydraulic infrastructure in the context of adaptive management. A qualitative approach was used to evaluate over 130 reports on all stages of the design, planning and construction of the Haringvliet sluices as part of the realization of the Delta Works. The time frame is set between 1950 and 1970. The main source of information is a set of quarterly reports to the Dutch parliament, published between 1956 and 1988, and which provided detailed information on design, construction, maintenance, system behavior, policy needs, social demands and stakeholders. The original objectives of the infrastructure were reflected in its design: protection against flooding, protection against salt intrusion and discharge of water and ice - all with a desired ease of operations of the gates of the infrastructure. The dimensions of the Haringvliet sluices thank their uniqueness to the requirements to discharge both ice and water. Upon completion of the Haringvliet sluices in 1970, two main observations can be made. First, environmental issues were hardly considered, while the focus was on protection against flooding and salt from the sea. Second, during the construction phase, experimentation, learning and adaptation were reported. Changes were made during the construction and based on extreme weather events and lessons learned from construction activities elsewhere. These observations prompt the question whether an experimental approach as applied during the construction of the Haringvliet sluices would be allowed for in modern infrastructure projects of comparable impact, size and costs. A second question to be studied should be what happened after the completion of the Haringvliet sluices, when this infrastructure had to be operated and in a context in which environmental issues gradually became more prominent and eventually integrated into the water management practice.

  16. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  17. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  18. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  19. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  20. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  1. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  2. Vulnerability assessment of groundwater-dependent ecosystems based on integrated groundwater flow modell construction

    NASA Astrophysics Data System (ADS)

    Tóth, Ádám; Simon, Szilvia; Galsa, Attila; Havril, Timea; Monteiro Santos, Fernando A.; Müller, Imre; Mádl-Szőnyi, Judit

    2017-04-01

    Groundwater-dependent ecosystems (GDEs) are highly influenced by the amount of groundwater, seasonal variation of precipitation and consequent water table fluctuation and also the anthropogenic activities. They can be regarded as natural surface manifestations of the flowing groundwater. The preservation of environment and biodiversity of these GDEs is an important issue worldwide, however, the water management policy and action plan could not be constructed in absense of proper hydrogeological knowledge. The concept of gravity-driven regional groundwater flow could aid the understanding of flow pattern and interpretation of environmental processes and conditions. Unless the required well data are available, the geological-hydrogeological numerical model of the study area cannot be constructed based only on borehole information. In this case, spatially continuous geophysical data can support groundwater flow model building: systematically combined geophysical methods can provide model input. Integration of lithostratigraphic, electrostratigraphic and hydrostratigraphic information could aid groundwater flow model construction: hydrostratigraphic units and their hydraulic behaviour, boundaries and geometry can be obtained. Groundwater-related natural manifestations, such as GDEs, can be explained with the help of the revealed flow pattern and field mapping of features. Integrated groundwater flow model construction for assessing the vulnerability of GDEs was presented via the case study of the geologically complex area of Tihany Peninsula, Hungary, with the aims of understanding the background and occurrence of groundwater-related environmental phenomena, surface water-groundwater interaction, and revealing the potential effect of anthropogenic activity and climate change. In spite of its important and protected status, fluid flow model of the area, which could support water management and natural protection policy, had not been constructed previously. The 3D groundwater flow model, which was based on the scarce geologic information and the electromagnetic geophysical results, could answer the subsurface hydraulic connection between GDEs. Moreover, the gravity-driven regional groundwater flow concept could help to interpret the hydraulically nested flow systems (local and intermediate). Validation of numerical simulation by natural surface conditions and phenomena was performed. Consequently, the position of wetlands, their vegetation type, discharge features and induced landslides were explained as environmental imprints of groundwater. Anthropogenic activities and climate change have great impact on groundwater. Since the GDEs are fed by local flow systems, the impact of climate change and anthropogenic activities could be notable, therefore the highly vulnerable wetlands have to be in focus of water management and natural conservation policy.

  3. Candidate soil indicators for monitoring the progress of constructed wetlands toward a natural state: a statistical approach

    USGS Publications Warehouse

    Stapanian, Martin A.; Adams, Jean V.; Fennessy, M. Siobhan; Mack, John; Micacchion, Mick

    2013-01-01

    A persistent question among ecologists and environmental managers is whether constructed wetlands are structurally or functionally equivalent to naturally occurring wetlands. We examined 19 variables collected from 10 constructed and nine natural emergent wetlands in Ohio, USA. Our primary objective was to identify candidate indicators of wetland class (natural or constructed), based on measurements of soil properties and an index of vegetation integrity, that can be used to track the progress of constructed wetlands toward a natural state. The method of nearest shrunken centroids was used to find a subset of variables that would serve as the best classifiers of wetland class, and error rate was calculated using a five-fold cross-validation procedure. The shrunken differences of percent total organic carbon (% TOC) and percent dry weight of the soil exhibited the greatest distances from the overall centroid. Classification based on these two variables yielded a misclassification rate of 11% based on cross-validation. Our results indicate that % TOC and percent dry weight can be used as candidate indicators of the status of emergent, constructed wetlands in Ohio and for assessing the performance of mitigation. The method of nearest shrunken centroids has excellent potential for further applications in ecology.

  4. Decision problems in management of construction projects

    NASA Astrophysics Data System (ADS)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  5. Defense Base Realignment and Closure Budget Data for MCGuire Air Force Base, New Jersey

    DTIC Science & Technology

    1995-08-04

    The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of two projects, valued at $22.4 miilion, for the realignment of McGuire Air Force Base, New Jersey. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective.

  6. Construction manpower management system.

    DOT National Transportation Integrated Search

    1990-01-01

    This report traces the development of and explains the operation of a Construction Manpower Management System (CMMS) developed for the Virginia Department of Transportation (VDOT). Initial direction for this project was received from the Construction...

  7. Study on HOPE Management Mode of Coal Enterprises Based on Systematic Thinking

    NASA Astrophysics Data System (ADS)

    Zhaoran, Zhang; Tianzhu, Zhang; Wenjing, Tong

    2018-02-01

    The extensive management mode of coal enterprises is no longer applicable to the demand of enterprise development under the new economic situation. Combined with the characteristics of coal mine production, based on the system of thinking, integration of lean, people, comprehensive, job management theory, formed HOPE management model, including a core system and three support systems and 18 elements. There are three stages in the development and implementation of this model. To 6S site management for the initial stage to job process reengineering for the intermediate stage to post value process control for the advanced stage. The successful implementation of HOPE model in coal enterprises needs comprehensive control from five aspects: lean culture construction, flattening organizational structure, cost control system, performance appraisal system and lean information management platform. HOPE model can be implemented smoothly and make “win-win” between enterprises and employees.

  8. Entrepreneur environment management behavior evaluation method derived from environmental economy.

    PubMed

    Zhang, Lili; Hou, Xilin; Xi, Fengru

    2013-12-01

    Evaluation system can encourage and guide entrepreneurs, and impel them to perform well in environment management. An evaluation method based on advantage structure is established. It is used to analyze entrepreneur environment management behavior in China. Entrepreneur environment management behavior evaluation index system is constructed based on empirical research. Evaluation method of entrepreneurs is put forward, from the point of objective programming-theory to alert entrepreneurs concerned to think much of it, which means to take minimized objective function as comprehensive evaluation result and identify disadvantage structure pattern. Application research shows that overall behavior of Chinese entrepreneurs environmental management are good, specially, environment strategic behavior are best, environmental management behavior are second, cultural behavior ranks last. Application results show the efficiency and feasibility of this method. Copyright © 2013 The Research Centre for Eco-Environmental Sciences, Chinese Academy of Sciences. Published by Elsevier B.V. All rights reserved.

  9. [Research on the Application of Lean Management in Medical Consumables Material Logistics Management].

    PubMed

    Yang, Chai; Zhang, Wei; Gu, Wei; Shen, Aizong

    2016-11-01

    Solve the problems of high cost, low utilization rate of resources, low medical care quality problem in medical consumables material logistics management for scientific of medical consumables management. Analysis of the problems existing in the domestic medical consumables material logistics management in hospital, based on lean management method, SPD(Supply, Processing, Distribution) for specific applications, combined HBOS(Hospital Business Operation System), HIS (Hospital Information System) system for medical consumables material management. Achieve the lean management in medical consumables material purchase, warehouse construction, push, clinical use and retrospect. Lean management in medical consumables material can effectively control the cost in logistics management, optimize the alocation of resources, liberate unnecessary time of medical staff, improve the quality of medical care. It is a scientific management method.

  10. Centralization of dairy farming facilities for improved economics and environmental quality.

    PubMed

    Inaba, Rokuta; Furuichi, Tohru; Komatsu, Toshihiro; Tanikawa, Noboru; Ishii, Kazuei

    2009-01-01

    In Japan, most farm animal excreta has been stored directly on farmland. Runoff from this storage has often caused water pollution. Biogasification is anticipated as an important technology to manage excreta properly, but complex problems hinder its introduction. Economic aspects of management have been especially difficult for dairy farmers. For this study, structural problems regarding introduction of biogasification into dairy farming were identified. Subsequently, a desirable system of dairy farming including biogasification was suggested, and an evaluation model of the financial balance was constructed. A case study using current financial balances of several systems of dairy farming was evaluated using the constructed model and actual data. The systems were based on several policy alternatives including the suggested system mentioned above. Results show that a farmer can obtain sufficient income from a system featuring centralization of dairy housing and biogasification facilities and coordinated management by over six farmers.

  11. Risk management in technovigilance: construction and validation of a medical-hospital product evaluation instrument.

    PubMed

    Kuwabara, Cleuza Catsue Takeda; Evora, Yolanda Dora Martinez; de Oliveira, Márcio Mattos Borges

    2010-01-01

    With the continuous incorporation of health technologies, hospital risk management should be implemented to systemize the monitoring of adverse effects, performing actions to control and eliminate their damage. As part of these actions, Technovigilance is active in the procedures of acquisition, use and quality control of health products and equipment. This study aimed to construct and validate an instrument to evaluate medical-hospital products. This is a quantitative, exploratory, longitudinal and methodological development study, based on the Six Sigma quality management model, which has as its principle basis the component stages of the DMAIC Cycle. For data collection and content validation, the Delphi technique was used with professionals from the Brazilian Sentinel Hospital Network. It was concluded that the instrument developed permitted the evaluation of the product, differentiating between the results of the tested brands, in line with the initial study goal of qualifying the evaluations performed.

  12. Integration of Models of Building Interiors with Cadastral Data

    NASA Astrophysics Data System (ADS)

    Gotlib, Dariusz; Karabin, Marcin

    2017-12-01

    Demands for applications which use models of building interiors is growing and highly diversified. Those models are applied at the stage of designing and construction of a building, in applications which support real estate management, in navigation and marketing systems and, finally, in crisis management and security systems. They are created on the basis of different data: architectural and construction plans, both, in the analogue form, as well as CAD files, BIM data files, by means of laser scanning (TLS) and conventional surveys. In this context the issue of searching solutions which would integrate the existing models and lead to elimination of data redundancy is becoming more important. The authors analysed the possible input- of cadastral data (legal extent of premises) at the stage of the creation and updating different models of building's interiors. The paper focuses on one issue - the way of describing the geometry of premises basing on the most popular source data, i.e. architectural and construction plans. However, the described rules may be considered as universal and also may be applied in practice concerned may be used during the process of creation and updating indoor models based on BIM dataset or laser scanning clouds

  13. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  14. Sustainable Management of Construction and Demolition Materials

    EPA Pesticide Factsheets

    This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.

  15. 5 CFR 9701.502 - Rule of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.502 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.502 Rule of construction. In interpreting this...

  16. Record of Decision for the First Active Duty F-35A Operational Base

    DTIC Science & Technology

    2013-12-02

    trucks or sprinkler systems to keep all areas of vehicle movement damp enough to prevent dust from leaving the construction area. - Temporary wind...synergy between the operational and logistics communities in managing a new, highly complex weapon system . ACC’s existing F-16 squadrons at Hill AFB...Share information with local fire departments on F-35A crash response procedures. Soils and Water • Sequence construction activities to limit the soil

  17. Critical management practices influencing on-site waste minimization in construction projects.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Applying Fishers' Ecological Knowledge to Construct Past and Future Lobster Stocks in the Juan Fernández Archipelago, Chile

    PubMed Central

    Eddy, Tyler D.; Gardner, Jonathan P. A.; Pérez-Matus, Alejandro

    2010-01-01

    Over-exploited fisheries are a common feature of the modern world and a range of solutions including area closures (marine reserves; MRs), effort reduction, gear changes, ecosystem-based management, incentives and co-management have been suggested as techniques to rebuild over-fished populations. Historic accounts of lobster (Jasus frontalis) on the Chilean Juan Fernández Archipelago indicate a high abundance at all depths (intertidal to approximately 165 m), but presently lobsters are found almost exclusively in deeper regions of their natural distribution. Fishers' ecological knowledge (FEK) tells a story of serial depletion in lobster abundance at fishing grounds located closest to the fishing port with an associated decline in catch per unit effort (CPUE) throughout recent history. We have re-constructed baselines of lobster biomass throughout human history on the archipelago using historic data, the fishery catch record and FEK to permit examination of the potential effects of MRs, effort reduction and co-management (stewardship of catch) to restore stocks. We employed a bioeconomic model using FEK, fishery catch and effort data, underwater survey information, predicted population growth and response to MR protection (no-take) to explore different management strategies and their trade-offs to restore stocks and improve catches. Our findings indicate that increased stewardship of catch coupled with 30% area closure (MR) provides the best option to reconstruct historic baselines. Based on model predictions, continued exploitation under the current management scheme is highly influenced by annual fluctuations and unsustainable. We propose a community-based co-management program to implement a MR in order to rebuild the lobster population while also providing conservation protection for marine species endemic to the Archipelago. PMID:21079761

  19. 76 FR 64977 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... the NRC to assess the adequacy of proposed seismic design bases and the design bases for other site..., designed, constructed, and maintained to withstand geologic hazards, such as faulting, seismic hazards, and... potential man-made hazards will be appropriately accounted for in the design of nuclear power and test...

  20. The MORPG-Based Learning System for Multiple Courses: A Case Study on Computer Science Curriculum

    ERIC Educational Resources Information Center

    Liu, Kuo-Yu

    2015-01-01

    This study aimed at developing a Multiplayer Online Role Playing Game-based (MORPG) Learning system which enabled instructors to construct a game scenario and manage sharable and reusable learning content for multiple courses. It used the curriculum of "Introduction to Computer Science" as a study case to assess students' learning…

  1. Simplified web-based decision support method for traffic management and work zone analysis.

    DOT National Transportation Integrated Search

    2017-01-01

    Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work zone ...

  2. Simplified web-based decision support method for traffic management and work zone analysis.

    DOT National Transportation Integrated Search

    2015-06-01

    Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when : planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work : z...

  3. ACHP | Working Together to Build a More Inclusive Preservation Program

    Science.gov Websites

    Manager. He has over a decade of experience in the construction industry as a contractor and project working on my Masters, I was employed by an Athens, GA-based general contractor who specialized in

  4. Minority shareholder claims foul at Stone & Webster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krizan, W.G.

    1994-05-09

    An activist minority shareholder is trying to shake up the management of one of the industry`s oldest firms, New York City-based engineering-constructor Stone & Webster Inc., The shareholder has filed a lawsuit against the 105-year-old firm, claiming that it is understanding losses from construction activities and is using the voting rights of employee-owned stock to perpetuate current management to the detriment of all shareholders.

  5. Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2017-01-01

    Conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line of sight UAS operations in the low-altitude airspace. Use build-a-little-test-a-little strategy remote areas to urban areas Low density: No traffic management required but understanding of airspace constraints. Cooperative traffic management: Understanding of airspace constraints and other operations. Manned and unmanned traffic management: Scalable and heterogeneous operations. UTM construct consistent with FAAs risk-based strategy. UTM research platform is used for simulations and tests. UTM offers path towards scalability

  6. Use of online health information to manage children's health care: a prospective study investigating parental decisions.

    PubMed

    Walsh, Anne M; Hamilton, Kyra; White, Katherine M; Hyde, Melissa K

    2015-04-02

    The use of the internet to access information is rapidly increasing; however, the quality of health information provided on various online sites is questionable. We aimed to examine the underlying factors that guide parents' decisions to use online information to manage their child's health care, a behaviour which has not yet been explored systematically. Parents (N = 391) completed a questionnaire assessing the standard theory of planned behaviour (TPB) measures of attitude, subjective norm, perceived behavioural control (PBC), and intention as well as the underlying TPB belief-based items (i.e., behavioural, normative, and control beliefs) in addition to a measure of perceived risk and demographic variables. Two months later, consenting parents completed a follow-up telephone questionnaire which assessed the decisions they had made regarding their use of online information to manage their child's health care during the previous 2 months. We found support for the TPB constructs of attitude, subjective norm, and PBC as well as the additional construct of perceived risk in predicting parents' intentions to use online information to manage their child's health care, with further support found for intentions, but not PBC, in predicting parents' behaviour. The results of the TPB belief-based analyses also revealed important information about the critical beliefs that guide parents' decisions to engage in this child health management behaviour. This theory-based investigation to understand parents' motivations and online information-seeking behaviour is key to developing recommendations and policies to guide more appropriate help-seeking actions among parents.

  7. Knowledge modeling of coal mining equipments based on ontology

    NASA Astrophysics Data System (ADS)

    Zhang, Baolong; Wang, Xiangqian; Li, Huizong; Jiang, Miaomiao

    2017-06-01

    The problems of information redundancy and sharing are universe in coal mining equipment management. In order to improve the using efficiency of knowledge of coal mining equipments, this paper proposed a new method of knowledge modeling based on ontology. On the basis of analyzing the structures and internal relations of coal mining equipment knowledge, taking OWL as ontology construct language, the ontology model of coal mining equipment knowledge is built with the help of Protégé 4.3 software tools. The knowledge description method will lay the foundation for the high effective knowledge management and sharing, which is very significant for improving the production management level of coal mining enterprises.

  8. Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project

    NASA Astrophysics Data System (ADS)

    Jiang, Weijin; Xu, Yuhui

    Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.

  9. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects

    NASA Astrophysics Data System (ADS)

    Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui

    2010-06-01

    The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.

  10. Construction project management handbook : September 2009.

    DOT National Transportation Integrated Search

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  11. Evaluation of optional fee structures for solid waste management in China.

    PubMed

    Wu, Yun-Ga; Chu, Zhu-Jie; Zhuang, Jun

    2018-06-01

    A municipal solid waste fee has become an important means for the implementation of the waste management rendered by the government all around the world. Based on the ecological environmental compensation theory, this article constructs an analytical framework of waste charging from the perspective of public policy evaluation, to carry on the comprehensive comparison and analysis to the operability, feasibility, validity, rationality, and universality of the two modes of waste charging: Ration charge and unit-pricing modes. The results indicate that in the cities with large amounts of waste production, long time of waste charging, and high disposal rate, pilot projects should be carried out; and the government needs to improve the construction of associated laws and regulations.

  12. Occupational safety and health management in the construction industry: a review.

    PubMed

    Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin

    2017-09-11

    The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.

  13. Insight into dementia care management using social-behavioral theory and mixed methods.

    PubMed

    Connor, Karen; McNeese-Smith, Donna; van Servellen, Gwen; Chang, Betty; Lee, Martin; Cheng, Eric; Hajar, Abdulrahman; Vickrey, Barbara G

    2009-01-01

    For health organizations (private and public) to advance their care-management programs, to use resources effectively and efficiently, and to improve patient outcomes, it is germane to isolate and quantify care-management activities and to identify overarching domains. The aims of this study were to identify and report on an application of mixed methods of qualitative statistical techniques, based on a theoretical framework, and to construct variables for factor analysis and exploratory factor analytic steps for identifying domains of dementia care management. Care-management activity data were extracted from the care plans of 181 pairs of individuals (with dementia and their informal caregivers) who had participated in the intervention arm of a randomized controlled trial of a dementia care-management program. Activities were organized into types, using card-sorting methods, influenced by published theoretical constructs on self-efficacy and general strain theory. These activity types were mapped in the initial data set to construct variables for exploratory factor analysis. Principal components extraction with varimax and promax rotations was used to estimate the number of factors. Cronbach's alpha was calculated for the items in each factor to assess internal consistency reliability. The two-phase card-sorting technique yielded 45 activity types out of 450 unique activities. Exploratory factor analysis produced four care-management domains (factors): behavior management, clinical strategies and caregiver support, community agency, and safety. Internal consistency reliability (Cronbach's alpha) of items for each factor ranged from.63 for the factor "safety" to.89 for the factor "behavior management" (Factor 1). Applying a systematic method to a large set of care-management activities can identify a parsimonious number of higher order categories of variables and factors to guide the understanding of dementia care-management processes. Further application of this methodology in outcome analyses and to other data sets is necessary to test its practicality.

  14. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  15. Ecological risk assessment based on IHA-RVA in the lower Xiaolangdi reservoir under changed hydrological situation

    NASA Astrophysics Data System (ADS)

    Bai, Tao; Ma, Pan-pan; Kan, Yan-bin; Huang, Qiang

    2017-12-01

    Ecological risk assessment of river is an important content for protection and improvement of ecological environment. In this paper, taking Xiaolangdi reservoir for example, ecological risk assessments are studied based on the 1956-1997 and 2002-2008 dairy runoff data as the pre and post of construction of Xiaolangdi reservoir. Considering pre and post hydrological regime of construction of Xiaolangdi, ecological risk assessment index systems of downstream are established based on Index of Hydrologic Alteration-Range of Variability Approach method (IHA-RVA), which considering characters of flow, time, frequency, delay and change rate. Then ecological risk fuzzy comprehensive evaluation assessment model downstream is established based on risk index and RVA method. The results show that after the construction of Xiaolangdi reservoir, ecological risk occurred in the downstream of Yellow River for changed hydrological indexes, such as monthly average flow, frequency and duration of extreme annual flow and so on, which probably destroy the whole ecosystems of the river. For example, ecological risk downstream of Xiaolangdi reservoir upgrade to level two in 2008. Research results make reference values and scientific basis both in ecological risk assessment and management of reservoir after construction.

  16. Data exploration of social client relationship management (CRM 2.0) adoption in the Nigerian construction business.

    PubMed

    Ojelabi, Rapheal A; Afolabi, Adedeji O; Oyeyipo, Opeyemi O; Tunji-Olayeni, Patience F; Adewale, Bukola A

    2018-06-01

    Integrating social client relationship management (CRM 2.0) in the built environment can enhance the relationship between construction organizations and client towards sustaining a long and lasting collaboration. The data exploration analyzed the e-readiness of contracting and consulting construction firms in the uptake of CRM 2.0 and the barriers encountered in the adoption of the modern business tool. The targeted organizations consist of seventy five (75) construction businesses operating in Lagos State which were selected from a pool of registered contracting and consulting construction firms using random sampling technique. Descriptive statistics of the e-readiness of contracting and consulting construction firms for CRM 2.0 adoption and barriers limiting its uptake were analyzed. Also, inferential analysis using Mann-Whitney U statistical and independent sample t-test was performed on the dataset obtained. The data generated will support construction firms on the necessity to engage in client social relationship management in ensuring sustainable client relationship management in the built environment.

  17. Peculiarities of organizing the construction of nuclear medicine facilities and the transportation of radionuclide

    NASA Astrophysics Data System (ADS)

    Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor

    2017-10-01

    The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.

  18. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  19. 17th Annual School Construction Report, 2012

    ERIC Educational Resources Information Center

    Abramson, Paul

    2012-01-01

    The 2012 "School Planning & Management"'s 17th Annual School Construction Report reports over the last two years although school construction had fallen from previous highs, the pipeline of projects funded before the recession was still full. And so, in 2009 total construction was a solid $16.4 billion. But the pipeline is not being…

  20. Research on BIM-based building information value chain reengineering

    NASA Astrophysics Data System (ADS)

    Hui, Zhao; Weishuang, Xie

    2017-04-01

    The achievement of value and value-added factor to the building engineering information is accomplished through a chain-flow, that is, building the information value chain. Based on the deconstruction of the information chain on the construction information in the traditional information mode, this paper clarifies the value characteristics and requirements of each stage of the construction project. In order to achieve building information value-added, the paper deconstructs the traditional building information value chain, reengineer the information value chain model on the basis of the theory and techniques of BIM, to build value-added management model and analyse the value of the model.

  1. Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil.

    PubMed

    Penteado, Carmenlucia Santos Giordano; Rosado, Laís Peixoto

    2016-10-01

    Brazil, as a result of economic development and strengthening of the construction industry in recent years, is generating an increasing amount of construction and demolition waste (CDW). Hence, environmental assessment of the management systems is vital. A life cycle assessment (LCA) is presented of CDW management in a medium-sized municipality located in the southeast region of Brazil, where the impacts of leaching were not considered due to absence of consistent data. Six different proposed scenarios for the current CDW management situation have been considered. These scenarios comprised the combined use of landfilling, sorting, and recycling, and the use of CDW as paving material for landfill roads, in different percentages. Considering 0.8 ton of waste as the functional unit, the life cycle inventory was performed using primary data obtained from field survey and secondary data from the database Ecoinvent version 3.1, and from the literature. The method CML 2 baseline 2001 was used for environmental impacts evaluation. The results highlight that recycling is beneficial when efficient CDW sorting takes place at construction sites, avoiding the transport of refuse to sorting and recycling facilities, and the distance between the generation source and the recycling unit is within 30 km. Thus, our results are helpful to ensure that the decision-making processes are based on environmental and technical aspects, and not only on economic and political factors, and also provide data and support for other LCA studies on CDW. © The Author(s) 2016.

  2. Inflow forecasting model construction with stochastic time series for coordinated dam operation

    NASA Astrophysics Data System (ADS)

    Kim, T.; Jung, Y.; Kim, H.; Heo, J. H.

    2014-12-01

    Dam inflow forecasting is one of the most important tasks in dam operation for an effective water resources management and control. In general, dam inflow forecasting with stochastic time series model is possible to apply when the data is stationary because most of stochastic process based on stationarity. However, recent hydrological data cannot be satisfied the stationarity anymore because of climate change. Therefore a stochastic time series model, which can consider seasonality and trend in the data series, named SARIMAX(Seasonal Autoregressive Integrated Average with eXternal variable) model were constructed in this study. This SARIMAX model could increase the performance of stochastic time series model by considering the nonstationarity components and external variable such as precipitation. For application, the models were constructed for four coordinated dams on Han river in South Korea with monthly time series data. As a result, the models of each dam have similar performance and it would be possible to use the model for coordinated dam operation.Acknowledgement This research was supported by a grant 'Establishing Active Disaster Management System of Flood Control Structures by using 3D BIM Technique' [NEMA-NH-12-57] from the Natural Hazard Mitigation Research Group, National Emergency Management Agency of Korea.

  3. Identifying behaviour patterns of construction safety using system archetypes.

    PubMed

    Guo, Brian H W; Yiu, Tak Wing; González, Vicente A

    2015-07-01

    Construction safety management involves complex issues (e.g., different trades, multi-organizational project structure, constantly changing work environment, and transient workforce). Systems thinking is widely considered as an effective approach to understanding and managing the complexity. This paper aims to better understand dynamic complexity of construction safety management by exploring archetypes of construction safety. To achieve this, this paper adopted the ground theory method (GTM) and 22 interviews were conducted with participants in various positions (government safety inspector, client, health and safety manager, safety consultant, safety auditor, and safety researcher). Eight archetypes were emerged from the collected data: (1) safety regulations, (2) incentive programs, (3) procurement and safety, (4) safety management in small businesses (5) production and safety, (6) workers' conflicting goals, (7) blame on workers, and (8) reactive and proactive learning. These archetypes capture the interactions between a wide range of factors within various hierarchical levels and subsystems. As a free-standing tool, they advance the understanding of dynamic complexity of construction safety management and provide systemic insights into dealing with the complexity. They also can facilitate system dynamics modelling of construction safety process. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. Studies on combined model based on functional objectives of large scale complex engineering

    NASA Astrophysics Data System (ADS)

    Yuting, Wang; Jingchun, Feng; Jiabao, Sun

    2018-03-01

    As various functions were included in large scale complex engineering, and each function would be conducted with completion of one or more projects, combined projects affecting their functions should be located. Based on the types of project portfolio, the relationship of projects and their functional objectives were analyzed. On that premise, portfolio projects-technics based on their functional objectives were introduced, then we studied and raised the principles of portfolio projects-technics based on the functional objectives of projects. In addition, The processes of combined projects were also constructed. With the help of portfolio projects-technics based on the functional objectives of projects, our research findings laid a good foundation for management of large scale complex engineering portfolio management.

  5. 32 CFR 700.325 - The Assistant Secretary of the Navy (Installations and Environment).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Secretary of the Navy (Installations and Environment) is responsible for: (a) Policy relating to Navy...) Development, implementation and evaluation of military construction, facilities management and engineering, strategic homeporting, housing, utilities, and base utilization issues; (c) Environmental policy, safety...

  6. Road landslide information management and forecasting system base on GIS.

    PubMed

    Wang, Wei Dong; Du, Xiang Gang; Xie, Cui Ming

    2009-09-01

    Take account of the characters of road geological hazard and its supervision, it is very important to develop the Road Landslides Information Management and Forecasting System based on Geographic Information System (GIS). The paper presents the system objective, function, component modules and key techniques in the procedure of system development. The system, based on the spatial information and attribute information of road geological hazard, was developed and applied in Guizhou, a province of China where there are numerous and typical landslides. The manager of communication, using the system, can visually inquire all road landslides information based on regional road network or on the monitoring network of individual landslide. Furthermore, the system, integrated with mathematical prediction models and the GIS's strongpoint on spatial analyzing, can assess and predict landslide developing procedure according to the field monitoring data. Thus, it can efficiently assists the road construction or management units in making decision to control the landslides and to reduce human vulnerability.

  7. Research on Risk Management and Power Supplying Enterprise Control

    NASA Astrophysics Data System (ADS)

    Shen, Jianfei; Wang, Yige

    2017-09-01

    This paper derived from the background that electric power enterprises strengthen their risk management under requirements of the government. For the power industry, we explained the risk management theory, analysed current macro environment as well as basic situation, then classified and interpreted the main risks. In a case study on a power bureau, we established a risk management system based on deep understanding about the characteristics of its organization system and risk management function. Then, we focused on risks in operation as well as incorrupt government construction to give a more effective framework of the risk management system. Finally, we came up with the problems and specific countermeasures in risk management, which provided a reference for other electric power enterprises.

  8. Construction and Application of a Refined Hospital Management Chain.

    PubMed

    Lihua, Yi

    2016-01-01

    Large scale development was quite common in the later period of hospital industrialization in China. Today, Chinese hospital management faces such problems as service inefficiency, high human resources cost, and low rate of capital use. This study analyzes the refined management chain of Wuxi No.2 People's Hospital. This consists of six gears namely, "organizational structure, clinical practice, outpatient service, medical technology, and nursing care and logistics." The gears are based on "flat management system targets, chief of medical staff, centralized outpatient service, intensified medical examinations, vertical nursing management and socialized logistics." The core concepts of refined hospital management are optimizing flow process, reducing waste, improving efficiency, saving costs, and taking good care of patients as most important. Keywords: Hospital, Refined, Management chain

  9. The Large Synoptic Survey Telescope (LSST) Camera

    ScienceCinema

    None

    2018-06-13

    Ranked as the top ground-based national priority for the field for the current decade, LSST is currently under construction in Chile. The U.S. Department of Energy’s SLAC National Accelerator Laboratory is leading the construction of the LSST camera – the largest digital camera ever built for astronomy. SLAC Professor Steven M. Kahn is the overall Director of the LSST project, and SLAC personnel are also participating in the data management. The National Science Foundation is the lead agency for construction of the LSST. Additional financial support comes from the Department of Energy and private funding raised by the LSST Corporation.

  10. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    NASA Astrophysics Data System (ADS)

    Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy

    2018-03-01

    In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  11. Application of BIM Technology in Prefabricated Buildings

    NASA Astrophysics Data System (ADS)

    Zhanglin, Guo; Si, Gao; Jun-e, Liu

    2017-08-01

    The development of fabricated buildings has become the main trend of the developm ent of modern construction industry in China. As the main tool of building information, BIM (b uilding information modeling) has greatly promoted the development of construction industry. Based on the review of the papers about the fabricated buildings and BIM technology in recent years, this paper analyzes the advantages of fabricated buildings and BIM technology, then exp lores the application of BIM technology in fabricated buildings. It aims to realize the rationaliz ation and scientification of project lifecycle management in fabricated construction project, and finally form a coherent information platform in the fabricated building.

  12. UTM Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    Conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line of sight UAS operations in the low-altitude airspace. Use build-a-little-test-a-little strategy remote areas to urban areas Low density: No traffic management required but understanding of airspace constraints. Cooperative traffic management: Understanding of airspace constraints and other operations. Manned and unmanned traffic management: Scalable and heterogeneous operations. UTM construct consistent with FAAs risk-based strategy. UTM research platform is used for simulations and tests. UTM offers path towards scalability.

  13. UTM Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2016-01-01

    Conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line of sight UAS operations in the low-altitude airspace. Use build-a-little-test-a-little strategy remote areas to urban areas Low density: No traffic management required but understanding of airspace constraints. Cooperative traffic management: Understanding of airspace constraints and other operations. Manned and unmanned traffic management: Scalable and heterogeneous operations. UTM construct consistent with FAAs risk-based strategy. UTM research platform is used for simulations and tests. UTM offers path towards scalability.

  14. Integrated waste management system costs in a MPC system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Supko, E.M.

    1995-12-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility.

  15. A synthesis study on collecting, managing, and sharing road construction asset data.

    DOT National Transportation Integrated Search

    2015-09-01

    Accurate and complete construction records and asbuilt data are the key prerequisites to the effective management of transportation : infrastructure assets throughout their life cycle. The construction phase is the best time to collect such data. ...

  16. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  17. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  18. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  19. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  20. Solidification/stabilization of dredged marine sediments for road construction.

    PubMed

    Wang, Dong Xing; Abriak, Nor Edine; Zentar, Rachid; Xu, WeiYa

    2012-01-01

    Cement/lime-based solidification is an environmentally sound solution for the management of dredged marine sediments, instead of traditional solutions such as immersion. Based on the mineralogical composition and physical characteristics of Dunkirk sediments, the effects of cement and lime are assessed through Atterberg limits, modified Proctor compaction, unconfined compressive strength and indirect tensile strength tests. The variation of Atterberg limits and the improvement in strength are discussed at different binder contents. The potential of sediments solidified with cement or lime for road construction is evaluated through a proposed methodology from two aspects: I-CBR value and material classification. The test results show the feasibility of solidified dredged sediments for beneficial use as a material in road construction. Cement is superior to lime in terms of strength improvement, and adding 6% cement is an economic and reasonable method to stabilize fine sediments.

  1. Prediction of Self-Management Behavior among Iranian Women with Type 2 Diabetes: Application of the Theory of Reasoned Action along with Self-Efficacy (ETRA).

    PubMed

    Didarloo, A R; Shojaeizadeh, D; Gharaaghaji Asl, R; Habibzadeh, H; Niknami, Sh; Pourali, R

    2012-02-01

    Continuous performing of diabetes self-care behaviors was shown to be an effective strategy to control diabetes and to prevent or reduce its- related complications. This study aimed to investigate predictors of self-care behavior based on the extended theory of reasoned action by self efficacy (ETRA) among women with type 2 diabetes in Iran. A sample of 352 women with type 2 diabetes, referring to a Diabetes Clinic in Khoy, Iran using the nonprobability sampling was enrolled. Appropriate instruments were designed to measure the variables of interest (diabetes knowledge, personal beliefs, subjective norm, self-efficacy and behavioral intention along with self- care behaviors). Reliability and validity of the instruments using Cronbach's alpha coefficients (the values of them were more than 0.70) and a panel of experts were tested. A statistical significant correlation existed between independent constructs of proposed model and modelrelated dependent constructs, as ETRA model along with its related external factors explained 41.5% of variance of intentions and 25.3% of variance of actual behavior. Among constructs of model, self-efficacy was the strongest predictor of intentions among women with type 2 diabetes, as it lonely explained 31.3% of variance of intentions and 11.4% of variance of self-care behavior. The high ability of the extended theory of reasoned action with self-efficacy in forecasting and explaining diabetes mellitus self management can be a base for educational intervention. So to improve diabetes self management behavior and to control the disease, use of educational interventions based on proposed model is suggested.

  2. Avian and Herpetological Survey Results for Fairchild Air Force Base and Ancillary Properties

    DTIC Science & Technology

    2014-10-02

    unlimited. The US Army Engineer Research and Development Center (ERDC) solves the nation’s toughest engineering and environmental challenges. ERDC...Herpetological Survey Results for Fairchild Air Force Base and Ancillary Properties Jinelle H. Sperry Construction Engineering Research Laboratory (CERL) US ...Air Force Base (FAFB) and used survey results to extrapolate guidelines for species management. DISCLAIMER: The contents of this report are not to be

  3. Developing the content of two behavioural interventions: Using theory-based interventions to promote GP management of upper respiratory tract infection without prescribing antibiotics #1

    PubMed Central

    Hrisos, Susan; Eccles, Martin; Johnston, Marie; Francis, Jill; Kaner, Eileen FS; Steen, Nick; Grimshaw, Jeremy

    2008-01-01

    Background Evidence shows that antibiotics have limited effectiveness in the management of upper respiratory tract infection (URTI) yet GPs continue to prescribe antibiotics. Implementation research does not currently provide a strong evidence base to guide the choice of interventions to promote the uptake of such evidence-based practice by health professionals. While systematic reviews demonstrate that interventions to change clinical practice can be effective, heterogeneity between studies hinders generalisation to routine practice. Psychological models of behaviour change that have been used successfully to predict variation in behaviour in the general population can also predict the clinical behaviour of healthcare professionals. The purpose of this study was to design two theoretically-based interventions to promote the management of upper respiratory tract infection (URTI) without prescribing antibiotics. Method Interventions were developed using a systematic, empirically informed approach in which we: selected theoretical frameworks; identified modifiable behavioural antecedents that predicted GPs intended and actual management of URTI; mapped these target antecedents on to evidence-based behaviour change techniques; and operationalised intervention components in a format suitable for delivery by postal questionnaire. Results We identified two psychological constructs that predicted GP management of URTI: "Self-efficacy," representing belief in one's capabilities, and "Anticipated consequences," representing beliefs about the consequences of one's actions. Behavioural techniques known to be effective in changing these beliefs were used in the design of two paper-based, interactive interventions. Intervention 1 targeted self-efficacy and required GPs to consider progressively more difficult situations in a "graded task" and to develop an "action plan" of what to do when next presented with one of these situations. Intervention 2 targeted anticipated consequences and required GPs to respond to a "persuasive communication" containing a series of pictures representing the consequences of managing URTI with and without antibiotics. Conclusion It is feasible to systematically develop theoretically-based interventions to change professional practice. Two interventions were designed that differentially target generalisable constructs predictive of GP management of URTI. Our detailed and scientific rationale for the choice and design of our interventions will provide a basis for understanding any effects identified in their evaluation. Trial registration Clinicaltrials.gov NCT00376142 PMID:18194527

  4. Glucose Sensors Based on Core@Shell Magnetic Nanomaterials and Their Application in Diabetes Management: A Review.

    PubMed

    Liu, Lin; Lv, Hongying; Teng, Zhenyuan; Wang, Chengyin; Wang, Guoxiu

    2015-01-01

    This review presents a comprehensive attempt to conclude and discuss various glucose biosensors based on core@shell magnetic nanomaterials. Owing to good biocompatibility and stability, the core@shell magnetic nanomaterials have found widespread applications in many fields and draw extensive attention. Most magnetic nanoparticles possess an intrinsic enzyme mimetic activity like natural peroxidases, which invests magnetic nanomaterials with great potential in the construction of glucose sensors. We summarize the synthesis of core@shell magnetic nanomaterials, fundamental theory of glucose sensor and the advances in glucose sensors based on core@shell magnetic nanomaterials. The aim of the review is to provide an overview of the exploitation of the core@shell magnetic nanomaterials for glucose sensors construction.

  5. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  6. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  7. General patterns of niche construction and the management of ‘wild’ plant and animal resources by small-scale pre-industrial societies

    PubMed Central

    Smith, Bruce D.

    2011-01-01

    Niche construction efforts by small-scale human societies that involve ‘wild’ species of plants and animals are organized into a set of six general categories based on the shared characteristics of the target species and similar patterns of human management and manipulation: (i) general modification of vegetation communities, (ii) broadcast sowing of wild annuals, (iii) transplantation of perennial fruit-bearing species, (iv) in-place encouragement of economically important perennials, (v) transplantation and in-place encouragement of perennial root crops, and (vi) landscape modification to increase prey abundance in specific locations. Case study examples, mostly drawn from North America, are presented for each of the six general categories of human niche construction. These empirically documented categories of ecosystem engineering form the basis for a predictive model that outlines potential general principles and commonalities in how small-scale human societies worldwide have modified and manipulated their ‘natural’ landscapes throughout the Holocene. PMID:21320898

  8. Construct validity of the Chinese version of the Self-care of Heart Failure Index determined using structural equation modeling.

    PubMed

    Kang, Xiaofeng; Dennison Himmelfarb, Cheryl R; Li, Zheng; Zhang, Jian; Lv, Rong; Guo, Jinyu

    2015-01-01

    The Self-care of Heart Failure Index (SCHFI) is an empirically tested instrument for measuring the self-care of patients with heart failure. The aim of this study was to develop a simplified Chinese version of the SCHFI and provide evidence for its construct validity. A total of 182 Chinese with heart failure were surveyed. A 2-step structural equation modeling procedure was applied to test construct validity. Factor analysis showed 3 factors explaining 43% of the variance. Structural equation model confirmed that self-care maintenance, self-care management, and self-care confidence are indeed indicators of self-care, and self-care confidence was a positive and equally strong predictor of self-care maintenance and self-care management. Moreover, self-care scores were correlated with the Partners in Health Scale, indicating satisfactory concurrent validity. The Chinese version of the SCHFI is a theory-based instrument for assessing self-care of Chinese patients with heart failure.

  9. Analysis of Informationization Construction of Business Financial Management under the Network Economy

    NASA Astrophysics Data System (ADS)

    Dong, Yahui; Zhang, Pengwei; Li, Wei

    To strengthen the informationization construction of the financial management has great significance to the achievement of business management informationization, and under the network economic environment, it is an important task of the financial management that how to conduct informationization construction of traditional financial management to provide true, reliable and complete financial information system for the business managers. This paper thoroughly researches the problem of financial information orientation management (FIOM) by taking the method of combining theory with practice. This paper puts forward the thinking method of financial information management, makes the new contents of E-finance. At last, this paper rebuilds the system of finance internal control from four aspects such as control of organization and management, system development control and safety control of network system.

  10. Performance Probability Distributions for Sediment Control Best Management Practices

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R.; Walsh, K.

    2007-12-01

    Controlling soil erosion and sediment transport can be a significant challenge during the construction process due to the extent and conditions of bare, disturbed soils. Best Management Practices (BMPs) are used as the framework for the design of sediment discharge prevention systems in stormwater pollution prevention plans which are typically required for construction sites. This research focuses on commonly-used BMP systems for perimeter control of sediment export: silt fences and fiber rolls. Although these systems are widely used, the physical and engineering parameters describing their performance are not well understood. Performance expectations are based on manufacturer results, but due to the dynamic conditions that exist on a construction site performance expectations are not always achievable in the field. Based on experimental results product performance is shown to be highly variable. Experiments using the same installation procedures show inconsistent sediment removal performances ranging from (>)85 percent to zero. The goal of this research is to improve the determination of off-site sediment yield based on probabilistic performance results of perimeter control BMPs. BMPs are evaluated in the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with a soil depth of 0.5 meters and a slope of 33 percent. The simulated storm event consists of 17 mm/hr for 20 minutes followed by 51 mm/hr for 30 minutes. The storm event is based on an ASTM design storm intended to simulate BMP failures. BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, less than optimal installations, and no treatment conditions. Preliminary results from 30 experiments are presented and used to develop probability distributions for BMP sediment removal efficiencies. The results are then combined with spatial and temporal distributions of perimeter sediment loadings for a construction site to estimate the time dependent risk of off-site sediment discharge over the duration of a project (ex., 0, 25, 50, 75 and 100 percent complete). The results are used to highlight the importance of considering all phases of construction when developing stormwater pollution prevention plans.

  11. [Study on interventions based on systematic ecological system construction to interrupt transmission of schistosomiasis in hilly endemic regions].

    PubMed

    Jia, Xu; Xue-Xiang, Wan; Lin, Chen; Bo, Zhong; Yi, Zhang

    2016-10-13

    To study the effectiveness of comprehensive control measures based on systematic ecological system construction to interrupt the transmission of schistosomiasis in hilly endemic regions in Sichuan Province, so as to provide the evidence for adjustment of schistosomiasis prevention and control strategies. A high endemic area of schistosomiasis, Panao Township of Dongpo District in Meishan City, was selected as a demonstration area. The comprehensive measures for schistosomiasis control with focus on systematic ecological management were implemented, and the income of residents, indexes of schistosomiasis control effect and so on were investigated before and after the intervention and the results were compared. The project based on systematic ecological system construction started in 2009 and 317.351 million Yuan was put into the construction. The construction included economic forest plant base (1 866.68 hm 2 , 72.66% of the total farmland areas), ecological protection gardens (585.35 hm 2 ) and so on. Totally 97.04% of historical areas with Oncomelania hupensis snails were comprehensively improved. In 2015, the peasants´ pure income per capita increased 4 938 Yuan, with the average annual growth rate of 14.69%. All the farm cattle were replaced by the machine. The benefit rate of water improvement was increased by 52.84% and the coverage rate of harmless toilets increased by 18.30%. The positive rate of serological tests for schistosomiasis decreased from 7.69% to 3.50%, and the positive rate of parasitological tests decreased from 1.18% to 0. The area with snails was decreased from 23.33 hm 2 to 0. The awareness rate of schistosomiasis control knowledge and correct behavior rate of the residents increased from 85.50% and 82.60% to 95.70% and 93.90% respectively. The comprehensive schistosomiasis control measures based on systematic ecological management are conform to the currently actual schistosomiasis prevention and control work in hilly endemic regions, and have good ecological economic benefit and schistosomiasis control effectiveness, which provide an effectively new model of prevention and control for advancing process, consolidating the effect, finally realizing goal of interruption and elimination of schistosomiasis in hilly endemic regions.

  12. Store manager performance and satisfaction: effects on store employee performance and satisfaction, store customer satisfaction, and store customer spending growth.

    PubMed

    Netemeyer, Richard G; Maxham, James G; Lichtenstein, Donald R

    2010-05-01

    Based on emotional contagion theory and the value-profit chain literatures, the present study posits a number of hypotheses that show how managers in the small store, small number of employees retail context may affect store employees, customers, and potentially store performance. With data from 306 store managers, 1,615 store customer-contact employees, and 57,656 customers of a single retail chain, the authors examined relationships among store manager job satisfaction and job performance, store customer-contact employee job satisfaction and job performance, customer satisfaction with the retailer, and a customer-spending-based store performance metric (customer spending growth over a 2-year period). Via path analysis, several hypothesized direct and interaction relations among these constructs are supported. The results suggest implications for academic researchers and retail managers. PsycINFO Database Record (c) 2010 APA, all rights reserved.

  13. Risk assessment for construction projects of transport infrastructure objects

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  14. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  15. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  16. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  17. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  18. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  19. Marshall Space Flight Center's role in EASE/ACCESS mission management

    NASA Technical Reports Server (NTRS)

    Hawkins, Gerald W.

    1987-01-01

    The Marshall Space Flight Center (MSFC) Spacelab Payload Project Office was responsible for the mission management and development of several successful payloads. Two recent space construction experiments, the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS), were combined into a payload managed by the center. The Ease/ACCESS was flown aboard the Space Shuttle Mission 61-B. The EASE/ACCESS experiments were the first structures assembled in space, and the method used to manage this successful effort will be useful for future space construction missions. The MSFC mission management responsibilities for the EASE/ACCESS mission are addressed and how the lessons learned from the mission can be applied to future space construction projects are discussed.

  20. User's guide: estimation of key PCC, base, subbase, and pavement engineering properties from routine tests and physical characteristics

    DOT National Transportation Integrated Search

    2012-08-01

    Material characterization is a critical component of modern day pavement analysis, design, construction, quality : control/quality assurance, management, and rehabilitation. At each stage during the life of a project, the influence of : several funda...

  1. Advanced Decision-Support for Coastal Beach Health: Virtual Beach 3.0

    EPA Science Inventory

    Virtual Beach is a free decision-support system designed to help beach managers and researchers construct, evaluate, and operate site-specific statistical models that can predict levels of fecal indicator bacteria (FIB) based on environmental conditions that are more readily mea...

  2. Options and recommendations for a web database of material and construction inspection.

    DOT National Transportation Integrated Search

    2015-02-01

    The Illinois Department of Transportation (IDOT) has been using software developed in-house for their : materials management and construction project management needs. The primary packages under : review MISTIC (Materials Management) and ICORS (Const...

  3. 41 CFR 102-76.10 - What basic design and construction policy governs Federal agencies?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What basic design and construction policy governs Federal agencies? 102-76.10 Section 102-76.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL...

  4. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  5. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  6. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  7. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  8. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What procedures must...

  9. Space Transportation System Western Launch Site Construction Management Information System - A Case Study.

    DTIC Science & Technology

    1979-09-01

    The Corps of Engineers Management Information System (COEMIS) is used by the Corps of Engineers in their role as Construction Agents on Air Force...California. The research concluded that the Corps of Engineers Management Information System can be an effective, efficient management tool which has the

  10. Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China.

    PubMed

    Li, Xinggao; Yuan, Dajun

    2016-01-01

    China's largest cities like Beijing and Shanghai have seen a sharp increase in subway network development as a result of the rapid urbanization in the last decade. The cities are still expanding their subway networks now, and many shield tunnels are being or will be constructed in close proximity to the existing operational subway tunnels. The execution plans for the new nearby shield tunnel construction calls for the development of a safety control framework-a set of control standards and best practices to help organizations manage the risks involved. Typical case studies and relevant key technical parameters are presented with a view to presenting the resulting safety control framework. The framework, created through collaboration among the relevant parties, addresses and manages the risks in a systematic way based on actual conditions of each tunnel crossing construction. The framework consists of six parts: (1) inspecting the operational subway tunnels; (2) deciding allowed movements of the existing tunnels and tracks; (3) simulating effects of the shield tunneling on the existing tunnels; (4) doing preparation work; (5) monitoring design and information management; and (6) measures and activation mechanism of the countermeasures. The six components are explained and demonstrated in detail. In the end, discussions made involve construction and post-construction settlement of the operational tunnel, application of the remedial grouting to rectify excessive settlements of the operational tunnel, and use of the innovative tool of the optical fiber measurement for tunnel movement monitoring. It is concluded that the construction movement of the tunnel can be controlled within 15 mm when the shield machine is <7 m in excavation diameter. The post-construction settlement of the tunnel buried in the very soft ground is much greater than its construction settlement, and last several years until reaching a final stable state. Two cases are outlined to demonstrate the feasibility of using the remedial grouting to reduce the long-term settlement of the operational tunnels. The more and more segmental tunnels being constructed, there is an increasing need of the optical fiber measurement for tunnel movement monitoring in the near future.

  11. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  12. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  13. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  14. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  15. [Role and management of cancer clinical database in the application of gastric cancer precision medicine].

    PubMed

    Li, Yuanfang; Zhou, Zhiwei

    2016-02-01

    Precision medicine is a new medical concept and medical model, which is based on personalized medicine, rapid progress of genome sequencing technology and cross application of biological information and big data science. Precision medicine improves the diagnosis and treatment of gastric cancer to provide more convenience through more profound analyses of characteristics, pathogenesis and other core issues in gastric cancer. Cancer clinical database is important to promote the development of precision medicine. Therefore, it is necessary to pay close attention to the construction and management of the database. The clinical database of Sun Yat-sen University Cancer Center is composed of medical record database, blood specimen bank, tissue bank and medical imaging database. In order to ensure the good quality of the database, the design and management of the database should follow the strict standard operation procedure(SOP) model. Data sharing is an important way to improve medical research in the era of medical big data. The construction and management of clinical database must also be strengthened and innovated.

  16. 48 CFR 846.471 - Determination authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 846.471 Determination authority. The... Construction and Facilities Management, for those items and services for which purchase authority has been assigned to the Office of Construction and Facilities Management. (b) The Director, Veterans Canteen...

  17. Important features of Sustainable Aggregate Resource Management

    USGS Publications Warehouse

    Solar, Slavko V.; Shields, Deborah J.; Langer, William H.

    2004-01-01

    Every society, whether developed, developing or in a phase of renewal following governmental change, requires stable, adequate and secure supplies of natural resources. In the latter case, there could be significant need for construction materials for rebuilding infrastructure, industrial capacity, and housing. It is essential that these large-volume materials be provided in a rational manner that maximizes their societal contribution and minimizes environmental impacts. We describe an approach to resource management based on the principles of sustainable developed. Sustainable Aggregate Resource Management offers a way of addressing the conflicting needs and interests of environmental, economic, and social systems. Sustainability is an ethics based concept that utilizes science and democratic processes to reach acceptable agreements and tradeoffs among interests, while acknowledging the fundamental importance of the environment and social goods. We discuss the features of sustainable aggregate resource management.

  18. Recruitment and Transition of Construction Lecturers in Further Education: The Perspective of Middle Managers

    ERIC Educational Resources Information Center

    Page, Damien

    2013-01-01

    This article presents findings from a study of 14 heads of construction in further education colleges in England as they manage the transition of new construction lecturers from a culture of hypermasculinity to one of emotional labour and caring. It focuses firstly on the dilemmas faced by heads of construction at the recruitment stage before…

  19. Construction in Occupied Spaces

    NASA Astrophysics Data System (ADS)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  20. DEVELOPMENT OF A SAFETY COMMUNICATION AND RECOGNITION PROGRAM FOR CONSTRUCTION

    PubMed Central

    SPARER, EMILY H.; HERRICK, ROBERT F.; DENNERLEIN, JACK T.

    2017-01-01

    Leading-indicator–based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator–based (e.g., injury rates) programs. We designed a leading-indicator–based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite, and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. PMID:25815741

  1. A Place-Oriented, Mixed-Level Regionalization Method for Constructing Geographic Areas in Health Data Dissemination and Analysis

    PubMed Central

    Mu, Lan; Wang, Fahui; Chen, Vivien W.; Wu, Xiao-Cheng

    2015-01-01

    Similar geographic areas often have great variations in population size. In health data management and analysis, it is desirable to obtain regions of comparable population by decomposing areas of large population (to gain more spatial variability) and merging areas of small population (to mask privacy of data). Based on the Peano curve algorithm and modified scale-space clustering, this research proposes a mixed-level regionalization (MLR) method to construct geographic areas with comparable population. The method accounts for spatial connectivity and compactness, attributive homogeneity, and exogenous criteria such as minimum (and approximately equal) population or disease counts. A case study using Louisiana cancer data illustrates the MLR method and its strengths and limitations. A major benefit of the method is that most upper level geographic boundaries can be preserved to increase familiarity of constructed areas. Therefore, the MLR method is more human-oriented and place-based than computer-oriented and space-based. PMID:26251551

  2. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  3. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  4. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  5. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  6. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  7. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  8. Lean Production as an Innovative Approach to Construction

    NASA Astrophysics Data System (ADS)

    Spišáková, Marcela; Kozlovská, Mária

    2013-06-01

    Lean production presents a new approach to the construction management which has enabled enterprises to attain very high levels of efficiency, competitiveness and flexibility in production systems. Nowadays, a number of industrial processes are managed in accordance with these advanced management principles [1]. The principles of lean production are applied within the integrated design and delivery solutions (IDDS) and prefabricated construction. IDDS uses collaborative work processes and enhanced skills, with integrated data, information, and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, and operation, and across projects. Prefabrication presents a one of opportunities for construction methods, which allows the compliance with principles of sustainable design, provides the potential benefits such as faster construction, fewer housing defects, reduction in energy use and waste and elimination of environmental and safety risks. This paper presents the lean production within the IDDS and its potential in the modern prefabrication. There is created a field providing of benefits of lean production in construction industry.

  9. Natural Resource Information System. Volume 1: Overall description

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A prototype computer-based Natural Resource Information System was designed which could store, process, and display data of maximum usefulness to land management decision making. The system includes graphic input and display, the use of remote sensing as a data source, and it is useful at multiple management levels. A survey established current decision making processes and functions, information requirements, and data collection and processing procedures. The applications of remote sensing data and processing requirements were established. Processing software was constructed and a data base established using high-altitude imagery and map coverage of selected areas of SE Arizona. Finally a demonstration of system processing functions was conducted utilizing material from the data base.

  10. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Sea-Based X-Band (SBX) Radar Vessel Maintenance and Repair. Draft Environmental Assessment

    DTIC Science & Technology

    2011-02-14

    crabs, lobsters, and shrimp), amphipods (small shrimp-like creatures), bivalves, barnacles, and gastropods (snails and slugs). Less common groups...A second phase will cover implementation of 10 years of post construction monitoring and adaptive management. Future 1 4.0 Cumulative Impacts

  12. Employee Engagement and Organizational Behavior Management

    ERIC Educational Resources Information Center

    Ludwig, Timothy D.; Frazier, Christopher B.

    2012-01-01

    Engagement is a "buzz" word that has gained popularity in Industrial/Organizational Psychology. Based on a "Positive Psychology" approach, engagement is perceived as a valuable state for employees, because surveys on the construct have found it correlates with some organizational tactics (e.g., human resource policies, procedural justice) and…

  13. Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti

    DTIC Science & Technology

    2016-09-30

    Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti S E P T E M B E R 3 0 , 2 0 1 6 Report...Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti Visit us at www.dodig.mil Objective We...Findings (cont’d) ii │ DODIG-2016-141 (Project No. D2014-D000RE-0157.000) Results in Brief Improvements Needed in Managing Scope Changes and Oversight

  14. An Examination of the Construct Validity of the Inventory of Classroom Management Style.

    ERIC Educational Resources Information Center

    Martin, Nancy K.; Baldwin, Beatrice

    Confirmatory factor analysis was used to examine the construct validity of a new instrument measuring perceptions toward classroom management: the Inventory of Classroom Management Style (ICMS). Classroom management was defined as a multifaceted process that includes three broad dimensions: (1) what teachers believe about students as persons; (2)…

  15. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the purpose of...

  16. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the purpose of...

  17. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the purpose of...

  18. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the purpose of...

  19. Visualizing whole-brain DTI tractography with GPU-based Tuboids and LoD management.

    PubMed

    Petrovic, Vid; Fallon, James; Kuester, Falko

    2007-01-01

    Diffusion Tensor Imaging (DTI) of the human brain, coupled with tractography techniques, enable the extraction of large-collections of three-dimensional tract pathways per subject. These pathways and pathway bundles represent the connectivity between different brain regions and are critical for the understanding of brain related diseases. A flexible and efficient GPU-based rendering technique for DTI tractography data is presented that addresses common performance bottlenecks and image-quality issues, allowing interactive render rates to be achieved on commodity hardware. An occlusion query-based pathway LoD management system for streamlines/streamtubes/tuboids is introduced that optimizes input geometry, vertex processing, and fragment processing loads, and helps reduce overdraw. The tuboid, a fully-shaded streamtube impostor constructed entirely on the GPU from streamline vertices, is also introduced. Unlike full streamtubes and other impostor constructs, tuboids require little to no preprocessing or extra space over the original streamline data. The supported fragment processing levels of detail range from texture-based draft shading to full raycast normal computation, Phong shading, environment mapping, and curvature-correct text labeling. The presented text labeling technique for tuboids provides adaptive, aesthetically pleasing labels that appear attached to the surface of the tubes. Furthermore, an occlusion query aggregating and scheduling scheme for tuboids is described that reduces the query overhead. Results for a tractography dataset are presented, and demonstrate that LoD-managed tuboids offer benefits over traditional streamtubes both in performance and appearance.

  20. The effect of Problem/Project-Based Learning on a desired skill set for construction professionals

    NASA Astrophysics Data System (ADS)

    Sirotiak, Todd L.

    The purpose of this study was to investigate if a Problem/Project-Based Learning (PBL) approach can affect certain non-technical, "soft" skills of construction engineers. Such skills include leadership, adaptability, and stress management. In mixed design research, quantitative and qualitative data are assembled and analyzed collectively. For this study, two separate assessment tools were used for the quantitative portion, while open-ended written reflections and a partially closed-ended senior questionnaire were implemented for the qualitative portion. A hypothetical model was used to investigate certain soft skills based on prior research documenting need. Skills investigated were confidence, stress coping, leadership, communication skills, adaptability, and management skills. Descriptive statistics, open-ended final written reflections, and a partially closed-ended senior questionnaire were used to analyze the data. PBL is a process in which the students are challenged to develop realistic solutions on open, less structured, real world type problems. The results of this study performed with the combined count of nearly 60 students suggest that PBL can influence several soft skills of senior construction engineers. Specifically, these findings demonstrate the following: (a) PBL appears to affect students' soft skills; (b) students appear to recognize the realism and "real world" applicability that PBL brings to their skill development; and (c) the data suggest that the experience is holistic and offers opportunities for balanced growth in several ways. Some key competencies such as communication and leadership indicated significant enhancements. Although this study was limited to one academic year of the university's construction engineering program, it provides interesting insight to changes within the time period investigated. This study should be replicated in other construction engineering environments to investigate a larger population sample. In addition, industry, professional consultants, and academic entities are encouraged to review current learning methods to ensure that they are implementing the findings and methodology offered in this study.

  1. C2 of C3: Command and Control of Command, Control, Communication Systems.

    DTIC Science & Technology

    1988-04-22

    capabilities the Army has not yet realized the full benefit of the new technology--largely because of deficiencies in the operational management of these newly...managers frequently constructed CEOI’s by drawing available frequencies or letter/number combinations (for unit callsigns) from a Bingo creel--which was...rapidly occurring changes, with subordinate units. At last, units were beginning to see the benefits of operating from a commonly shared data base. Up to

  2. Total Quality Management and Applications to the Construction Industry

    DTIC Science & Technology

    1993-01-01

    own total quality management process. The Ritz - Carlton Hotel Company, a 1992 Malcolm Baldrige Award winner, already categorizes its suppliers based on...to spend time away from work. The Ritz - Carlton Hotel Company, a 1992 Baldrige Award winner (see Appendix B), requires its employees to receive 126...W0e ned h7es%’ * 75 _ APPENDIX B * How Ritz - Carlton Won THE BALDRIGE AWARD An unswerving focus on continuous improvement helped this luxury hotel

  3. Biological information systems: Evolution as cognition-based information management.

    PubMed

    Miller, William B

    2018-05-01

    An alternative biological synthesis is presented that conceptualizes evolutionary biology as an epiphenomenon of integrated self-referential information management. Since all biological information has inherent ambiguity, the systematic assessment of information is required by living organisms to maintain self-identity and homeostatic equipoise in confrontation with environmental challenges. Through their self-referential attachment to information space, cells are the cornerstone of biological action. That individualized assessment of information space permits self-referential, self-organizing niche construction. That deployment of information and its subsequent selection enacted the dominant stable unicellular informational architectures whose biological expressions are the prokaryotic, archaeal, and eukaryotic unicellular forms. Multicellularity represents the collective appraisal of equivocal environmental information through a shared information space. This concerted action can be viewed as systematized information management to improve information quality for the maintenance of preferred homeostatic boundaries among the varied participants. When reiterated in successive scales, this same collaborative exchange of information yields macroscopic organisms as obligatory multicellular holobionts. Cognition-Based Evolution (CBE) upholds that assessment of information precedes biological action, and the deployment of information through integrative self-referential niche construction and natural cellular engineering antecedes selection. Therefore, evolutionary biology can be framed as a complex reciprocating interactome that consists of the assessment, communication, deployment and management of information by self-referential organisms at multiple scales in continuous confrontation with environmental stresses. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. 26 CFR 1.528-6 - Expenditure test.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... Qualifying expenditures are expenditures by an organization for the acquisition, construction, management..., construction, management, maintenance or care of association property, shall constitute qualifying expenditures...

  5. 26 CFR 1.528-6 - Expenditure test.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... Qualifying expenditures are expenditures by an organization for the acquisition, construction, management..., construction, management, maintenance or care of association property, shall constitute qualifying expenditures...

  6. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  7. 26 CFR 1.528-6 - Expenditure test.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Qualifying expenditures are expenditures by an organization for the acquisition, construction, management..., construction, management, maintenance or care of association property, shall constitute qualifying expenditures...

  8. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  9. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  10. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  11. The Saudi Initiative for Asthma - 2016 update: Guidelines for the diagnosis and management of asthma in adults and children

    PubMed Central

    Al-Moamary, Mohamed S.; Alhaider, Sami A.; Idrees, Majdy M.; Al Ghobain, Mohammed O.; Zeitouni, Mohammed O.; Al-Harbi, Adel S.; Yousef, Abdullah A.; Al-Matar, Hussain; Alorainy, Hassan S.; Al-Hajjaj, Mohamed S.

    2016-01-01

    This is an updated guideline for the diagnosis and management of asthma, developed by the Saudi Initiative for Asthma (SINA) group, a subsidiary of the Saudi Thoracic Society. The main objective of SINA is to have guidelines that are up to date, simple to understand and easy to use by nonasthma specialists, including primary care and general practice physicians. SINA approach is mainly based on symptom control and assessment of risk as it is the ultimate goal of treatment. The new SINA guidelines include updates of acute and chronic asthma management, with more emphasis on the use of asthma control in the management of asthma in adults and children, inclusion of a new medication appendix, and keeping consistency on the management at different age groups. The section on asthma in children is rewritten and expanded where the approach is stratified based on the age. The guidelines are constructed based on the available evidence, local literature, and the current situation in Saudi Arabia. There is also an emphasis on patient–doctor partnership in the management that also includes a self-management plan. PMID:26933455

  12. Formal Representations of Eligibility Criteria: A Literature Review

    PubMed Central

    Weng, Chunhua; Tu, Samson W.; Sim, Ida; Richesson, Rachel

    2010-01-01

    Standards-based, computable knowledge representations for eligibility criteria are increasingly needed to provide computer-based decision support for automated research participant screening, clinical evidence application, and clinical research knowledge management. We surveyed the literature and identified five aspects of eligibility criteria knowledge representations that contribute to the various research and clinical applications: the intended use of computable eligibility criteria, the classification of eligibility criteria, the expression language for representing eligibility rules, the encoding of eligibility concepts, and the modeling of patient data. We consider three of them (expression language, codification of eligibility concepts, and patient data modeling), to be essential constructs of a formal knowledge representation for eligibility criteria. The requirements for each of the three knowledge constructs vary for different use cases, which therefore should inform the development and choice of the constructs toward cost-effective knowledge representation efforts. We discuss the implications of our findings for standardization efforts toward sharable knowledge representation of eligibility criteria. PMID:20034594

  13. Modeling the sustainable development of innovation in transport construction based on the communication approach

    NASA Astrophysics Data System (ADS)

    Revunova, Svetlana; Vlasenko, Vyacheslav; Bukreev, Anatoly

    2017-10-01

    The article proposes the models of innovative activity development, which is driven by the formation of “points of innovation-driven growth”. The models are based on the analysis of the current state and dynamics of innovative development of construction enterprises in the transport sector and take into account a number of essential organizational and economic changes in management. The authors substantiate implementing such development models as an organizational innovation that has a communication genesis. The use of the communication approach to the formation of “points of innovation-driven growth” allowed the authors to apply the mathematical tools of the graph theory in order to activate the innovative activity of the transport industry in the region. As a result, the authors have proposed models that allow constructing an optimal mechanism for the formation of “points of innovation-driven growth”.

  14. Issues engulfed Saudi Arabia construction workers

    NASA Astrophysics Data System (ADS)

    Al-Emad, N. H.; Rahman, I. A.

    2018-04-01

    This paper presents an exploratory study conducted in Makkah city to uncover issues faced by construction workers from the construction leaders’ perspective. Eleven construction leaders/experts were interviewed to unleash their experiences on handling the foreign workers working in Makkah construction projects. Most of the experts are senior management staffs with more than 10 years’ working experience in Saudi Arabia construction industry. The interviews were carried out in semi structured mode where all the information was captured manually and also electronically. The identified issues were sorted based on its commonality into 10 clusters. Hence in each cluster, the numbers of issue considered by the experts are reflecting the importance of that particular cluster. The result of the clusters according to the number of issues mentioned by the experts are safety issues, restricted government regulation, demotivated issues, lack of quality workers, poor living quality, communication barriers, adaption issues, poor attitudes, lack of logistical arrangements and lack of education. With these identified issues it will assist the construction players in the construction industry of Saudi Arabia in dealing with their workers.

  15. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  16. Reliability and Validity of Assessing User Satisfaction With Web-Based Health Interventions

    PubMed Central

    Lehr, Dirk; Reis, Dorota; Vis, Christiaan; Riper, Heleen; Berking, Matthias; Ebert, David Daniel

    2016-01-01

    Background The perspective of users should be taken into account in the evaluation of Web-based health interventions. Assessing the users’ satisfaction with the intervention they receive could enhance the evidence for the intervention effects. Thus, there is a need for valid and reliable measures to assess satisfaction with Web-based health interventions. Objective The objective of this study was to analyze the reliability, factorial structure, and construct validity of the Client Satisfaction Questionnaire adapted to Internet-based interventions (CSQ-I). Methods The psychometric quality of the CSQ-I was analyzed in user samples from 2 separate randomized controlled trials evaluating Web-based health interventions, one from a depression prevention intervention (sample 1, N=174) and the other from a stress management intervention (sample 2, N=111). At first, the underlying measurement model of the CSQ-I was analyzed to determine the internal consistency. The factorial structure of the scale and the measurement invariance across groups were tested by multigroup confirmatory factor analyses. Additionally, the construct validity of the scale was examined by comparing satisfaction scores with the primary clinical outcome. Results Multigroup confirmatory analyses on the scale yielded a one-factorial structure with a good fit (root-mean-square error of approximation =.09, comparative fit index =.96, standardized root-mean-square residual =.05) that showed partial strong invariance across the 2 samples. The scale showed very good reliability, indicated by McDonald omegas of .95 in sample 1 and .93 in sample 2. Significant correlations with change in depressive symptoms (r=−.35, P<.001) and perceived stress (r=−.48, P<.001) demonstrated the construct validity of the scale. Conclusions The proven internal consistency, factorial structure, and construct validity of the CSQ-I indicate a good overall psychometric quality of the measure to assess the user’s general satisfaction with Web-based interventions for depression and stress management. Multigroup analyses indicate its robustness across different samples. Thus, the CSQ-I seems to be a suitable measure to consider the user’s perspective in the overall evaluation of Web-based health interventions. PMID:27582341

  17. Reliability and Validity of Assessing User Satisfaction With Web-Based Health Interventions.

    PubMed

    Boß, Leif; Lehr, Dirk; Reis, Dorota; Vis, Christiaan; Riper, Heleen; Berking, Matthias; Ebert, David Daniel

    2016-08-31

    The perspective of users should be taken into account in the evaluation of Web-based health interventions. Assessing the users' satisfaction with the intervention they receive could enhance the evidence for the intervention effects. Thus, there is a need for valid and reliable measures to assess satisfaction with Web-based health interventions. The objective of this study was to analyze the reliability, factorial structure, and construct validity of the Client Satisfaction Questionnaire adapted to Internet-based interventions (CSQ-I). The psychometric quality of the CSQ-I was analyzed in user samples from 2 separate randomized controlled trials evaluating Web-based health interventions, one from a depression prevention intervention (sample 1, N=174) and the other from a stress management intervention (sample 2, N=111). At first, the underlying measurement model of the CSQ-I was analyzed to determine the internal consistency. The factorial structure of the scale and the measurement invariance across groups were tested by multigroup confirmatory factor analyses. Additionally, the construct validity of the scale was examined by comparing satisfaction scores with the primary clinical outcome. Multigroup confirmatory analyses on the scale yielded a one-factorial structure with a good fit (root-mean-square error of approximation =.09, comparative fit index =.96, standardized root-mean-square residual =.05) that showed partial strong invariance across the 2 samples. The scale showed very good reliability, indicated by McDonald omegas of .95 in sample 1 and .93 in sample 2. Significant correlations with change in depressive symptoms (r=-.35, P<.001) and perceived stress (r=-.48, P<.001) demonstrated the construct validity of the scale. The proven internal consistency, factorial structure, and construct validity of the CSQ-I indicate a good overall psychometric quality of the measure to assess the user's general satisfaction with Web-based interventions for depression and stress management. Multigroup analyses indicate its robustness across different samples. Thus, the CSQ-I seems to be a suitable measure to consider the user's perspective in the overall evaluation of Web-based health interventions.

  18. Information model construction of MES oriented to mechanical blanking workshop

    NASA Astrophysics Data System (ADS)

    Wang, Jin-bo; Wang, Jin-ye; Yue, Yan-fang; Yao, Xue-min

    2016-11-01

    Manufacturing Execution System (MES) is one of the crucial technologies to implement informatization management in manufacturing enterprises, and the construction of its information model is the base of MES database development. Basis on the analysis of the manufacturing process information in mechanical blanking workshop and the information requirement of MES every function module, the IDEF1X method was adopted to construct the information model of MES oriented to mechanical blanking workshop, and a detailed description of the data structure feature included in MES every function module and their logical relationship was given from the point of view of information relationship, which laid the foundation for the design of MES database.

  19. Experiences With a Self-Reported Mobile Phone-Based System Among Patients With Colorectal Cancer: A Qualitative Study.

    PubMed

    Drott, Jenny; Vilhelmsson, Maria; Kjellgren, Karin; Berterö, Carina

    2016-06-09

    In cancer care, mobile phone-based systems are becoming more widely used in the assessment, monitoring, and management of side effects. To explore the experiences of patients with colorectal cancer on using a mobile phone-based system for reporting neurotoxic side effects. Eleven patients were interviewed (ages 44-68 years). A semistructured interview guide was used to perform telephone interviews. The interviews were transcribed verbatim and analyzed with qualitative content analysis. The patients' experiences of using a mobile phone-based system were identified and constructed as: "being involved," "pacing oneself," and "managing the questions." "Being involved" refers to their individual feelings. Patients were participating in their own care by being observant of the side effects they were experiencing. They were aware that the answers they gave were monitored in real time and taken into account by health care professionals when planning further treatment. "Pacing oneself" describes how the patients can have an impact on the time and place they choose to answer the questions. Answering the questionnaire was easy, and despite the substantial number of questions, it was quickly completed. "Managing the questions" pointed out that the patients needed to be observant because of the construction of the questions. They could not routinely answer all the questions. Patients understood that side effects can vary during the cycles of treatment and need to be assessed repeatedly during treatment. This mobile phone-based system reinforced the patients' feeling of involvement in their own care. The patients were comfortable with the technology and appreciated that the system was not time consuming.

  20. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

Top