Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estima...
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
ERIC Educational Resources Information Center
Straw, Eric M.
2013-01-01
The current research used grounded theory methodology (GTM) to construct a conceptualization of personal knowledge within a knowledge management (KM) perspective. The need for the current research was based on the use of just two categories of knowledge, explicit and tacit, within KM literature to explain diverse characteristics of personal…
Methodology to Estimate the Quantity, Composition, and ...
This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure. This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure.
Terror in time: extending culturomics to address basic terror management mechanisms.
Dechesne, Mark; Bandt-Law, Bryn
2018-04-11
Building on Google's efforts to scan millions of books, this article introduces methodology using a database of annual word frequencies of the 40,000 most frequently occurring words in the American literature between 1800 and 2009. The current paper uses this methodology to replicate and identify terror management processes in historical context. Variation in frequencies of word usage of constructs relevant to terror management theory (e.g. death, worldview, self-esteem, relationships) are investigated over a time period of 209 years. Study 1 corroborated previous TMT findings and demonstrated that word use of constructs related to death and of constructs related to patriotism and romantic relationships significantly co-vary over time. Study 2 showed that the use of the word "death" most strongly co-varies over time with the use of medical constructs, but also co-varies with the use of constructs related to violence, relationships, religion, positive sentiment, and negative sentiment. Study 3 found that a change in the use of death related words is associated with an increase in the use of fear related words, but not in anxiety related words. Results indicate that the described methodology generates valuable insights regarding terror management theory and provide new perspectives for theoretical advances.
Software Size Estimation Using Expert Estimation: A Fuzzy Logic Approach
ERIC Educational Resources Information Center
Stevenson, Glenn A.
2012-01-01
For decades software managers have been using formal methodologies such as the Constructive Cost Model and Function Points to estimate the effort of software projects during the early stages of project development. While some research shows these methodologies to be effective, many software managers feel that they are overly complicated to use and…
Rowlinson, Steve; Yunyanjia, Andrea; Li, Baizhan; Chuanjingju, Carrie
2014-05-01
Climatic heat stress leads to accidents on construction sites brought about by a range of human factors emanating from heat induced illness, and fatigue leading to impaired capability, physical and mental. It is an occupational characteristic of construction work in many climates and the authors take the approach of re-engineering the whole safety management system rather than focusing on incremental improvement, which is current management practice in the construction industry. From a scientific viewpoint, climatic heat stress is determined by six key factors: (1) air temperature, (2) humidity, (3) radiant heat, and (4) wind speed indicating the environment, (5) metabolic heat generated by physical activities, and (6) "clothing effect" that moderates the heat exchange between the body and the environment. By making use of existing heat stress indices and heat stress management processes, heat stress risk on construction sites can be managed in three ways: (1) control of environmental heat stress exposure through use of an action-triggering threshold system, (2) control of continuous work time (CWT, referred by maximum allowable exposure duration) with mandatory work-rest regimens, and (3) enabling self-paced working through empowerment of employees. Existing heat stress practices and methodologies are critically reviewed and the authors propose a three-level methodology for an action-triggering, localized, simplified threshold system to facilitate effective decisions by frontline supervisors. The authors point out the need for "regional based" heat stress management practices that reflect unique climatic conditions, working practices and acclimatization propensity by local workers indifferent geographic regions. The authors set out the case for regional, rather than international, standards that account for this uniqueness and which are derived from site-based rather than laboratory-based research. Copyright © 2013 Elsevier Ltd. All rights reserved.
High-rise construction in the Russian economy: modeling of management decisions
NASA Astrophysics Data System (ADS)
Miroshnikova, Tatyana; Taskaeva, Natalia
2018-03-01
The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.
Tamaki, Edson Mamoru; Tanaka, Oswaldo Yoshimi; Felisberto, Eronildo; Alves, Cinthia Kalyne de Almeida; Drumond Junior, Marcos; Bezerra, Luciana Caroline de Albuquerque; Calvo, Maria Cristina Marino; Miranda, Alcides Silva de
2012-04-01
This study sought to develop methodology for the construction of a Panel for the Monitoring and Evaluation of Management of the Unified Health System (SUS). The participative process used in addition to the systematization conducted made it possible to identify an effective strategy for building management tools in partnership with researchers, academic institutions and managers of the SUS. The final systematization of the Panel selected indicators for the management of the SUS in terms of Demand, Inputs, Processes, Outputs and Outcomes in order to provide a simple, versatile and useful tool for evaluation at any level of management and more transparent and easier communication with all stakeholders in decision-making. Taking the management of the SUS as the scope of these processes and practices in all normative aspects enabled dialog between systemic theories and those which consider the centrality of the social actor in the decision-making process.
NASA Technical Reports Server (NTRS)
Moroh, Marsha
1988-01-01
A methodology for building interfaces of resident database management systems to a heterogeneous distributed database management system under development at NASA, the DAVID system, was developed. The feasibility of that methodology was demonstrated by construction of the software necessary to perform the interface task. The interface terminology developed in the course of this research is presented. The work performed and the results are summarized.
Intelligent systems/software engineering methodology - A process to manage cost and risk
NASA Technical Reports Server (NTRS)
Friedlander, Carl; Lehrer, Nancy
1991-01-01
A systems development methodology is discussed that has been successfully applied to the construction of a number of intelligent systems. This methodology is a refinement of both evolutionary and spiral development methodologies. It is appropriate for development of intelligent systems. The application of advanced engineering methodology to the development of software products and intelligent systems is an important step toward supporting the transition of AI technology into aerospace applications. A description of the methodology and the process model from which it derives is given. Associated documents and tools are described which are used to manage the development process and record and report the emerging design.
Algorithm for evaluating the effectiveness of a high-rise development project based on current yield
NASA Astrophysics Data System (ADS)
Soboleva, Elena
2018-03-01
The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.
On Constructing, Grouping and Using Topical Ontology for Semantic Matching
NASA Astrophysics Data System (ADS)
Tang, Yan; de Baer, Peter; Zhao, Gang; Meersman, Robert
An ontology topic is used to group concepts from different contexts (or even from different domain ontologies). This paper presents a pattern-driven modeling methodology for constructing and grouping topics in an ontology (PAD-ON methodology), which is used for matching similarities between competences in the human resource management (HRM) domain. The methodology is supported by a tool called PAD-ON. This paper demonstrates our recent achievement in the work from the EC Prolix project. The paper approach is applied to the training processes at British Telecom as the test bed.
A STUDY ON THE HIERARCHY OF MANAGEMENT ELEMENTS
NASA Astrophysics Data System (ADS)
Suzuki, Nobuyuki; Watanabe, Tadashi
Compared to the late 20th century, the Japanese construction industry has drastically changed its business methodology, outlook and approach in response to global issues and the incredible advances in technology. Such influences, non-exhaustively include the; WTO Government procurement agreement, updating conditions of tendering and contracting, client demands for cost reduction and the rapid penetration of ICT (Information and Communication Technology) into modern society. These days, the significance of controlling Quality, Cost and Time (the so-called QCT) has been recognized as an eternal-triangle by almost all countries, Government organizations and the private sector. However, as the construction industry is exposed to , and influenced by, more and more internal and external dynamic factors, continued reliance on managing and controlling QCT elements on their own is no longer adequate in meeting the growing demands and expectations, and as such control of additional management elements is now essential to avoid problems, or minimize their potential impacts should they occur. This paper utilizes the results of a survey carried out amongst construction managers and consultants in Japan and overseas to develop a spatial network that defines the interaction of management factors as a weighted graphical model. The calculated closeness centrality index of the developed management network model is adopted to identify the initialelement hierarchy, which is then further analyzed using the minimum distance of independent relationships of management elements (Warshall-Floyd algorism methodology), to identify the optimum potential hierarchy for effective construction management. A key result of the analysis is the significance of "Human Resource" in the construction industry management element hierarchy alongside the traditional QCT elements.
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
The Formation of Professional Identity in French "Apprenti" Managers
ERIC Educational Resources Information Center
Angot, Jacques; Malloch, Hedley; Kleymann, Birgit
2008-01-01
Purpose: The paper aims to show how professional identity is constructed at a very early stage of initial management education. In so doing, it questions the notion of "le metier" in management. Design/methodology/approach: The paper is based on a study of the experiences of six French management apprentices (or apprentis) who…
Heat stress intervention research in construction: gaps and recommendations.
Yang, Yang; Chan, Albert Ping-Chuen
2017-06-08
Developing heat stress interventions for construction workers has received mounting concerns in recent years. However, limited efforts have been exerted to elaborate the rationale, methodology, and practicality of heat stress intervention in the construction industry. This study aims to review previous heat stress intervention research in construction, to identify the major research gaps in methodological issues, and to offer detailed recommendations for future studies. A total of 35 peer-reviewed journal papers have been identified to develop administrative, environmental or personal engineering interventions to safeguard construction workers. It was found that methodological limitations, such as arbitrary sampling methods and unreliable instruments, could be the major obstacle in undertaking heat stress intervention research. To bridge the identified research gaps, this study then refined a research framework for conducting heat stress intervention studies in the construction industry. The proposed research strategy provides researchers and practitioners with fresh insights into expanding multidisciplinary research areas and solving practical problems in the management of heat stress. The proposed research framework may foster the development of heat stress intervention research in construction, which further aids researchers, practitioners, and policymakers in formulating proper intervention strategies.
Thille, Patricia H; Russell, Grant M
2010-10-01
Current visions of family medicine and models of chronic illness management integrate evidence-based medicine with collaborative, patient-centered care, despite critiques that these constructs conflict with each other. With this potential conflict in mind, we applied a critical discursive psychology methodology to present discursive patterns articulated by 13 family physicians in Ontario, Canada, regarding care of patients living with multiple chronic illnesses. Physicians constructed competing versions of the terms "effective chronic illness management" and "patient involvement." One construction integrated individual responsibility for health with primacy of "evidence," resulting in a conceptualization consistent with paternalistic care. The second constructed effective care as involving active partnership of physician and patient, implying a need to foster the ability of both practitioners and patients to respond to complex challenges as they arose. The former pattern is inconsistent with visions of family medicine and chronic illness management, whereas the latter embodies it.
2013-01-01
Background This article aims to discuss the incorporation of traditional time in the construction of a management scenario for pink shrimp in the Patos Lagoon estuary (RS), Brazil. To meet this objective, two procedures have been adopted; one at a conceptual level and another at a methodological level. At the conceptual level, the concept of traditional time as a form of traditional ecological knowledge (TEK) was adopted. Method At the methodological level, we conduct a wide literature review of the scientific knowledge (SK) that guides recommendations for pink shrimp management by restricting the fishing season in the Patos Lagoon estuary; in addition, we review the ethno-scientific literature which describes traditional calendars as a management base for artisanal fishers in the Patos Lagoon estuary. Results Results demonstrate that TEK and SK describe similar estuarine biological processes, but are incommensurable at a resource management level. On the other hand, the construction of a “management scenario” for pink shrimp is possible through the development of “criteria for hierarchies of validity” which arise from a productive dialog between SK and TEK. Conclusions The commensurable and the incommensurable levels reveal different basis of time-space perceptions between traditional ecological knowledge and scientific knowledge. Despite incommensurability at the management level, it is possible to establish guidelines for the construction of “management scenarios” and to support a co-management process. PMID:23311826
Construction in Occupied Spaces
NASA Astrophysics Data System (ADS)
Ward, Andrew E.; Azhar, Salman; Khalfan, Malik
2017-06-01
Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.
Clinical code set engineering for reusing EHR data for research: A review.
Williams, Richard; Kontopantelis, Evangelos; Buchan, Iain; Peek, Niels
2017-06-01
The construction of reliable, reusable clinical code sets is essential when re-using Electronic Health Record (EHR) data for research. Yet code set definitions are rarely transparent and their sharing is almost non-existent. There is a lack of methodological standards for the management (construction, sharing, revision and reuse) of clinical code sets which needs to be addressed to ensure the reliability and credibility of studies which use code sets. To review methodological literature on the management of sets of clinical codes used in research on clinical databases and to provide a list of best practice recommendations for future studies and software tools. We performed an exhaustive search for methodological papers about clinical code set engineering for re-using EHR data in research. This was supplemented with papers identified by snowball sampling. In addition, a list of e-phenotyping systems was constructed by merging references from several systematic reviews on this topic, and the processes adopted by those systems for code set management was reviewed. Thirty methodological papers were reviewed. Common approaches included: creating an initial list of synonyms for the condition of interest (n=20); making use of the hierarchical nature of coding terminologies during searching (n=23); reviewing sets with clinician input (n=20); and reusing and updating an existing code set (n=20). Several open source software tools (n=3) were discovered. There is a need for software tools that enable users to easily and quickly create, revise, extend, review and share code sets and we provide a list of recommendations for their design and implementation. Research re-using EHR data could be improved through the further development, more widespread use and routine reporting of the methods by which clinical codes were selected. Copyright © 2017 The Author(s). Published by Elsevier Inc. All rights reserved.
A Mode of Combined ERP and KMS Knowledge Management System Construction
NASA Astrophysics Data System (ADS)
Yuena, Kang; Yangeng, Wen; Qun, Zhou
The core of ERP and knowledge management is quite similar; both will send appropriate knowledge (goods, funds) to the right people (position) at the right time. It is reasonable to believe that increase the knowledge management system in ERP will help companies achieve their goals better. This paper compares the concept of logical point of hall three-dimensional structure of the knowledge management system and the ERP in methodology level. And found they are very similar in the time dimension, logic dimension and knowledge dimension. This laid the basis of methodology in the simultaneous planning, implementation and applications. And then proposed a knowledge-based ERP Multi-Agent Management System Model. Finally, the paper described the process from planning to implementation of knowledge management ERP system with multi-Agent interaction and impact from three concepts, management thinking, software and system.
Psycho-Semantics of Management Constructs: Expression of Democracy among Schoolteachers
ERIC Educational Resources Information Center
Saparnis, Gintaras
2006-01-01
Purpose: The purpose of this research was to disclose the psycho-semantics of the opinions held by school educators in Lithuania on the expression of democracy in education management. Methodology: A non-standardized questionnaire asked teachers the open-ended question: "Are there any manifestations of democracy in your school? If yes (or…
We're Decent People: Constructing and Managing Family Identity in Rural Workingclass Communities
ERIC Educational Resources Information Center
Kiter Edwards, Margie L.
2004-01-01
Using grounded theory methodology, I establish family identity management as an important type of invisible work that connects women's household-based domestic activities with community members perceptions and treatment of them and their family members. Detailed observations of household routines and family interactions, as well as in-depth…
Evaluation in health: participatory methodology and involvement of municipal managers
de Almeida, Cristiane Andrea Locatelli; Tanaka, Oswaldo Yoshimi
2016-01-01
ABSTRACT OBJECTIVE To analyze scopes and limits of the use of participatory methodology of evaluation with municipal health managers and administrators. METHODS Qualitative research with health policymakers and managers of the Comissão Intergestores Regional (CIR – Regional Interagency Commission) of a health region of the state of Sao Paulo in Brazil. Representatives from seven member cities participated in seven workshops facilitated by the researchers, with the aim of assessing a specific problem of the care line, which would be used as a tracer of the system integrality. The analysis of the collected empirical material was based on the hermeneutic-dialectic methodology and aimed at the evaluation of the applied participatory methodology, according to its capacity of promoting a process of assessment capable to be used as a support for municipal management. RESULTS With the participatory approach of evaluation, we were able to promote in-depth discussions with the group, especially related to the construction of integral care and to the inclusion of the user’s perspective in decision-making, linked to the search for solution to concrete problems of managers. By joint exploration, the possibility of using data from electronic information systems was opened, as well as information coming directly from the users of the services, to enhance discussions and negotiations between partners. The participants were disbelievers of the replication potential of this type of evaluation without the direct monitoring of the academy, given the difficulty of organizing the process in everyday life, already taken by emergency and political issues. CONCLUSIONS Evaluations of programs and services carried out within the Regional Interagency Commission, starting from the local interest and facilitating the involvement of its members by the use of participatory methodologies, can contribute to the construction of integral care. To the extent that the act of evaluating stay invested with greater significance to the local actors, its involvement with the evaluations at the federal level can also be stimulated. PMID:27509011
Profitability Versus Construction Equipment Maintenance
2010-05-01
35 Figure 3-1 Methodology Flowchart ................................................................................ .44 Figure 4-1 Framework...1 Methodology Flowchart I I I I I I I I I I I I I I I I I I I 45 3.1. Focus Factors The focus of this study began by...best method of acquisition. Because of these combined factors, CEPOM can be implemented by beginners for equipment management and referred to by
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Social Media Technology Management in College of Technology in Oman
ERIC Educational Resources Information Center
Sharma, Himanshu; Pillai, Sunil Prakash
2017-01-01
Purpose: The purpose of this paper is to examine the impact of the constructs--utilitarian, hedonic and social value on the perceptions of the full-time instructors related to their social media technology (SMT) management for learning and teaching practices at workplace. Design/methodology/approach: A survey is used to gather the data from 180…
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1987-01-01
The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.
Quality assessment of urban environment
NASA Astrophysics Data System (ADS)
Ovsiannikova, T. Y.; Nikolaenko, M. N.
2015-01-01
This paper is dedicated to the research applicability of quality management problems of construction products. It is offered to expand quality management borders in construction, transferring its principles to urban systems as economic systems of higher level, which qualitative characteristics are substantially defined by quality of construction product. Buildings and structures form spatial-material basis of cities and the most important component of life sphere - urban environment. Authors justify the need for the assessment of urban environment quality as an important factor of social welfare and life quality in urban areas. The authors suggest definition of a term "urban environment". The methodology of quality assessment of urban environment is based on integrated approach which includes the system analysis of all factors and application of both quantitative methods of assessment (calculation of particular and integrated indicators) and qualitative methods (expert estimates and surveys). The authors propose the system of indicators, characterizing quality of the urban environment. This indicators fall into four classes. The authors show the methodology of their definition. The paper presents results of quality assessment of urban environment for several Siberian regions and comparative analysis of these results.
Healthcare managers' construction of the manager role in relation to the medical profession.
von Knorring, Mia; Alexanderson, Kristina; Eliasson, Miriam A
2016-05-16
Purpose - The purpose of this paper is to explore how healthcare managers construct the manager role in relation to the medical profession in their organisations. Design/methodology/approach - In total, 18 of Sweden's 20 healthcare chief executive officers (CEOs) and 20 clinical department managers (CDMs) were interviewed about their views on management of physicians. Interviews were performed in the context of one aspect of healthcare management; i.e., management of physicians' sickness certification practice. A discourse analysis approach was used for data analysis. Findings - Few managers used a management-based discourse to construct the manager role. Instead, a profession-based discourse dominated and managers frequently used the attributes "physician" or "non-physician" to categorise themselves or other managers in their managerial roles. Some managers, both CEOs and CDMs, shifted between the management- and profession-based discourses, resulting in a kind of "yes, but […]" approach to management in the organisations. The dominating profession-based discourse served to reproduce the power and status of physicians within the organisation, thereby rendering the manager role weaker than the medical profession for both physician and non-physician managers. Research limitations/implications - Further studies are needed to explore the impact of gender, managerial level, and basic profession on how managers construct the manager role in relation to physicians. Practical implications - The results suggest that there is a need to address the organisational conditions for managers' role taking in healthcare organisations. Originality/value - Despite the general strengthening of the manager position in healthcare through political reforms during the last decades, this study shows that a profession-based discourse clearly dominated in how the managers constructed the manager role in relation to the medical profession on the workplace level in their organisations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brigantic, Robert T.; Papatyi, Anthony F.; Perkins, Casey J.
This report summarizes a study and corresponding model development conducted in support of the United States Pacific Command (USPACOM) as part of the Federal Energy Management Program (FEMP) American Reinvestment and Recovery Act (ARRA). This research was aimed at developing a mathematical programming framework and accompanying optimization methodology in order to simultaneously evaluate energy efficiency (EE) and renewable energy (RE) opportunities. Once developed, this research then demonstrated this methodology at a USPACOM installation - Camp H.M. Smith, Hawaii. We believe this is the first time such an integrated, joint EE and RE optimization methodology has been constructed and demonstrated.
ERIC Educational Resources Information Center
Pereira Querol, Marco A.; Suutari, Timo; Seppanen, Laura
2010-01-01
The purpose of this paper is to present theoretical tools for understanding the dynamics of change and learning during the emergence and development of environmental management activities. The methodology consists of a historical analysis of a case of biogas production that took place in the Southwest region of Finland. The theoretical tools used…
NASA Astrophysics Data System (ADS)
Dontsov, Dmitry; Yushkova, Natalia
2017-01-01
The paper is aimed at detecting conceptual conflicts within the architectural and urban construction activity (AUCA), defining their reasons and substantiating ways to decrease adverse effects they caused. Methods of causes and effects analyses are used, as well as evolutional and comparative analyses. They allow defining the laws to form activity model in modern environment, whose elements are ranked. Relevance of the paper is based on defining scientific and theoretical grounds of necessity to improve methodology of AUCA via its adaption to the imperatives of state management. System analyses enabled to prove practicability of considering factors of institution environment for reorganization of the model of AUCA, which provide the fullest implementation of sustainable development principles. It was proved that territorial planning is not only the leading type of AUCA, but also integrator for functioning structures of state management within planning of social and economic development. As main result of the paper consist in detection of the perspective ways for evolution of modern methodology due to increasing interdisciplinary aspect leading to the qualitative renewal of territorial management principles.
Applications of Landsat data and the data base approach
Lauer, D.T.
1986-01-01
A generalized methodology for applying digital Landsat data to resource inventory and assessment tasks is currently being used by several bureaux and agencies within the US Department of the Interior. The methodology includes definition of project objectives and output, identification of source materials, construction of the digital data base, performance of computer-assisted analyses, and generation of output. The USGS, Bureau of Land Management, US Fish and Wildlife Service, Bureau of Indian Affairs, Bureau of Reclamation, and National Park Service have used this generalized methodology to assemble comprehensive digital data bases for resource management. Advanced information processing techniques have been applied to these data bases for making regional environmental surveys on millions of acres of public lands at costs ranging from $0.01 to $0.08 an acre.-Author
The Case for Case-Mix: A New Construct for Hospital Management
Plomann, Marilyn Peacock; Garzino, Fred R.
1981-01-01
Case-mix is a useful methodology for health care management, planning and control. It provides managers with a powerful tool by providing a framework for relating resource consumption profiles with specific treatment patterns. In the long run, it will assist hospital planners in analyzing the demands which different classes of patients bring to the hospital. Decisions concerning capital financing, facilities planning, new services, and the medical and financial implications of physician activities are more efficiently analyzed within a case-mix framework. In the near term, inventory management, staffing policies and the on-going need for the astute management of cash flow will be postively and decisively affected by the use of case-mix measures. The benefits derived from a case-mix system are not limited to hospitals possessing sophisticated management information systems. The case-mix methodology also provides a useful tool for hospitals with less advanced data processing systems and management practices in applying a variety of management science techniques to their planning and control activities.
Quantifying construction and demolition waste: An analytical review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, Zezhou; Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk; Shen, Liyin
2014-09-15
Highlights: • Prevailing C and D waste quantification methodologies are identified and compared. • One specific methodology cannot fulfill all waste quantification scenarios. • A relevance tree for appropriate quantification methodology selection is proposed. • More attentions should be paid to civil and infrastructural works. • Classified information is suggested for making an effective waste management plan. - Abstract: Quantifying construction and demolition (C and D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C and D waste generation at both regional and projectmore » levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C and D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested.« less
LIFE CYCLE MANAGEMENT OF MUNICIPAL SOLID WASTE
This is a large, complex project in which a number of different research activities are taking place concurrently to collect data, develop cost and LCI methodologies, construct a database and decision support tool, and conduct case studies with communities to support the life cyc...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Andújar-Montoya, María Dolores
2017-01-01
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693
Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio
2017-07-22
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Nassriya Water Treatment Plant Nassriya, Iraq. Sustainment Assessment
2008-04-28
Progress During Construction 8 Status of the WTP at Time of Turnover 11 Site Assessment 13 Continuing Problems for the Nassriya WTP 27...Future Plans for the Nassriya WTP 35 Conclusions 37 Recommendations 38 Management Comments 39 Evaluation of Management Comments 39...Appendices A. Scope and Methodology 40 B. FluorAmec’s Organizational Structure for the Nassriya WTP 41 C. FluorAmec’s Nassriya WTP Staffing Plan 42 D
Connecting Gender, Race, Class, and Immigration Status to Disease Management at the Workplace.
Rosemberg, Marie-Anne S; Tsai, Jenny Hsin-Chun
2014-01-01
Chronic diseases are the leading causes of death in the United States. Chronic disease management occurs within all aspects of an individual's life, including the workplace. Though the social constructs of gender, race, class, and immigration status within the workplace have been considered, their connection to disease management among workers has been less explicitly explored. Using a sample of immigrant hotel housekeepers, we explored the connections between these four social constructs and hypertension management. This qualitative research study was guided by critical ethnography methodology. Twenty-seven hotel room cleaners and four housemen were recruited ( N = 31) and invited to discuss their experiences with hypertension and hypertension management within the context of their work environments. Being a woman worker within the hotel industry was perceived to negatively influence participants' experience with hypertension and hypertension management. In contrast, being a woman played a protective role outside the workplace. Being an immigrant played both a positive and a negative role in hypertension and its management. Being black and from a low socioeconomic class had only adverse influences on participants' experience with hypertension and its management. Being a woman, black, lower class, and an immigrant simultaneously contribute to immigrant hotel housekeepers' health and their ability to effectively manage their hypertension. The connection between these four constructs (gender, race, class, and immigration status) and disease management must be considered during care provision. Hotel employers and policy stakeholders need to consider those constructs and how they impact workers' well-being. More studies are needed to identify what mitigates the associations between the intersectionality of these constructs and immigrant workers' health and disease management within their work environment.
Connecting Gender, Race, Class, and Immigration Status to Disease Management at the Workplace
Rosemberg, Marie-Anne S.; Tsai, Jenny Hsin-Chun
2016-01-01
Objective Chronic diseases are the leading causes of death in the United States. Chronic disease management occurs within all aspects of an individual's life, including the workplace. Though the social constructs of gender, race, class, and immigration status within the workplace have been considered, their connection to disease management among workers has been less explicitly explored. Using a sample of immigrant hotel housekeepers, we explored the connections between these four social constructs and hypertension management. Methods This qualitative research study was guided by critical ethnography methodology. Twenty-seven hotel room cleaners and four housemen were recruited (N = 31) and invited to discuss their experiences with hypertension and hypertension management within the context of their work environments. Results Being a woman worker within the hotel industry was perceived to negatively influence participants’ experience with hypertension and hypertension management. In contrast, being a woman played a protective role outside the workplace. Being an immigrant played both a positive and a negative role in hypertension and its management. Being black and from a low socioeconomic class had only adverse influences on participants’ experience with hypertension and its management. Conclusion Being a woman, black, lower class, and an immigrant simultaneously contribute to immigrant hotel housekeepers’ health and their ability to effectively manage their hypertension. The connection between these four constructs (gender, race, class, and immigration status) and disease management must be considered during care provision. Hotel employers and policy stakeholders need to consider those constructs and how they impact workers’ well-being. More studies are needed to identify what mitigates the associations between the intersectionality of these constructs and immigrant workers’ health and disease management within their work environment. PMID:27695659
Risk assessment for construction projects of transport infrastructure objects
NASA Astrophysics Data System (ADS)
Titarenko, Boris
2017-10-01
The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.
Beliefs into Practice: A Religious Inquiry into Teacher Knowledge
ERIC Educational Resources Information Center
Baurain, Bradley
2012-01-01
In the field of teacher knowledge, "beliefs" is a large term narrowly constructed. The beliefs theorized, researched, and discussed are beliefs about technique, methodology, curriculum, classroom management, professional development, and similarly. Spiritual and religious beliefs are for the most part omitted. This study argues that they should be…
Developing Constructivist Learning Environments: A Management Framework
ERIC Educational Resources Information Center
Haartsen-Geven, Manon; Sandberg, Jacobijn
2007-01-01
Purpose: The purpose of the paper is to provide insight in the critical factors involved in creating an optimum in developing technology for educational innovation, for each stakeholder, in any relevant context and at any time. Design/methodology/approach: From literature review, four diagrams were constructed to contain the critical factors…
2010-03-01
80 Discussion ...methods used to construct the survey questionnaire and discuss the data analysis methodology. Chapter IV will present the analysis of the data...2 provides a snapshot of the similarities and differences across various studies on new product development. The subsequent paragraphs will discuss
NASA Astrophysics Data System (ADS)
Uvarova, Svetlana; Vlasenko, Vyacheslav; Bukreev, Anatoly; Myshovskaya, Ludmila; Kuzina, Olga
2018-03-01
This article is based on the analysis of modern condition and dynamics of innovational development of high-rise buildings construction. A number of cardinal organizational and economic changes in management at the macro and meso-levels is taken into the account. Principal scheme of development of the methodology of formation of perspective innovation politics in high-ruse buildings construction based on inculcation of modern methods of strategic control of innovational activity is suggested in this article.
Törner, Marianne; Pousette, Anders
2009-01-01
The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.
Methodology for Knowledge Synthesis of the Management of Vaccination Pain and Needle Fear.
Taddio, Anna; McMurtry, C Meghan; Shah, Vibhuti; Yoon, Eugene W; Uleryk, Elizabeth; Pillai Riddell, Rebecca; Lang, Eddy; Chambers, Christine T; Noel, Melanie; MacDonald, Noni E
2015-10-01
A knowledge synthesis was undertaken to inform the development of a revised and expanded clinical practice guideline about managing vaccination pain in children to include the management of pain across the lifespan and the management of fear in individuals with high levels of needle fear. This manuscript describes the methodological details of the knowledge synthesis and presents the list of included clinical questions, critical and important outcomes, search strategy, and search strategy results. The Grading of Assessments, Recommendations, Development and Evaluation (GRADE) and Cochrane methodologies provided the general framework. The project team voted on clinical questions for inclusion and critically important and important outcomes. A broad search strategy was used to identify relevant randomized-controlled trials and quasi-randomized-controlled trials. Quality of research evidence was assessed using the Cochrane risk of bias tool and quality across studies was assessed using GRADE. Multiple measures of the same construct within studies (eg, observer-rated and parent-rated infant distress) were combined before pooling. The standardized mean difference and 95% confidence intervals (CI) or relative risk and 95% CI was used to express the effects of an intervention. Altogether, 55 clinical questions were selected for inclusion in the knowledge synthesis; 49 pertained to pain management during vaccine injections and 6 pertained to fear management in individuals with high levels of needle fear. Pain, fear, and distress were typically prioritized as critically important outcomes across clinical questions. The search strategy identified 136 relevant studies. This manuscript describes the methodological details of a knowledge synthesis about pain management during vaccination and fear management in individuals with high levels of needle fear. Subsequent manuscripts in this series will present the results for the included questions.
From Apprentice to Construction Manager and beyond: Developing a Talent Pipeline
ERIC Educational Resources Information Center
McGettingan, Eamonn; O'Neill, Donal
2009-01-01
Purpose: The purpose of this paper is to outline the approach taken within Kentz Engineers and Constructors to develop electrical technicians and other apprentices on an international basis. Design/methodology/approach: The approach adopted is that of a case study which describes activities and processes within the college and the rationale behind…
Australia's First Public Private Partnership School Project
ERIC Educational Resources Information Center
Ross, Peter
2004-01-01
The design and construction of nine schools has commenced in Australia using a Public Private Partnerships (PPPs) methodology. This is the first project in Australia where social infrastructure has been acquired in this way. The Australian project is being managed by the New South Wales (NSW) State Government through its Department of Education…
Servant Leadership in English Sixth Form Colleges: What Do Teachers Tell Us?
ERIC Educational Resources Information Center
Stoten, David William
2013-01-01
Purpose: The purpose of this paper is to investigate whether servant leadership can be applied to college management. The research methodology involved questionnaire and co-constructed discussion eliciting the views of teachers on how they interpret leadership in a sixth form college. Three other models of leadership were discussed along with…
Influence of communal and private folklore on bringing meaning to the experience of persistent pain.
Hendricks, Joyce Marie
2015-11-01
To provide an overview of the relevance and strengths of using the literary folkloristic methodology to explore the ways in which people with persistent pain relate to and make sense of their experiences through narrative accounts. Storytelling is a conversation with a purpose. The reciprocal bond between researcher and storyteller enables the examination of the meaning of experiences. Life narratives, in the context of wider traditional and communal folklore, can be analysed to discover how people make sense of their circumstances. This paper draws from the experience of the author, who has previously used this narrative approach. It is a reflection of how the approach may be used to understand those experiencing persistent pain without a consensual diagnosis. Using an integrative method, peer-reviewed research and discussion papers published between January 1990 and December 2014 and listed in the CINAHL, Science Direct, PsycINFO and Google Scholar databases were reviewed. In addition, texts that addressed research methodologies such as literary folkloristic methodology and Marxist literary theory were used. The unique role that nurses play in managing pain is couched in the historical and cultural context of nursing. Literary folkloristic methodology offers an opportunity to gain a better understanding and appreciation of how the experience of pain is constructed and to connect with sufferers. Literary folkloristic methodology reveals that those with persistent pain are often rendered powerless to live their lives. Increasing awareness of how this experience is constructed and maintained also allows an understanding of societal influences on nursing practice. Nurse researchers try to understand experiences in light of specific situations. Literary folkloristic methodology can enable them to understand the inter-relationship between people in persistent pain and how they construct their experiences.
Project risk management in the construction of high-rise buildings
NASA Astrophysics Data System (ADS)
Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya
2018-03-01
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.
Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project
NASA Astrophysics Data System (ADS)
Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy
2018-03-01
In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.
Construction and management of ARDS/sepsis registry with REDCap.
Pang, Xiaoqing; Kozlowski, Natascha; Wu, Sulong; Jiang, Mei; Huang, Yongbo; Mao, Pu; Liu, Xiaoqing; He, Weiqun; Huang, Chaoyi; Li, Yimin; Zhang, Haibo
2014-09-01
The study aimed to construct and manage an acute respiratory distress syndrome (ARDS)/sepsis registry that can be used for data warehousing and clinical research. The workflow methodology and software solution of research electronic data capture (REDCap) was used to construct the ARDS/sepsis registry. Clinical data from ARDS and sepsis patients registered to the intensive care unit (ICU) of our hospital formed the registry. These data were converted to the electronic case report form (eCRF) format used in REDCap by trained medical staff. Data validation, quality control, and database management were conducted to ensure data integrity. The clinical data of 67 patients registered to the ICU between June 2013 and December 2013 were analyzed. Of the 67 patients, 45 (67.2%) were classified as sepsis, 14 (20.9%) as ARDS, and eight (11.9%) as sepsis-associated ARDS. The patients' information, comprising demographic characteristics, medical history, clinical interventions, daily assessment, clinical outcome, and follow-up data, was properly managed and safely stored in the ARDS/sepsis registry. Data efficiency was guaranteed by performing data collection and data entry twice weekly and every two weeks, respectively. The ARDS/sepsis database that we constructed and manage with REDCap in the ICU can provide a solid foundation for translational research on the clinical data of interest, and a model for development of other medical registries in the future.
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Badger, W.; Beckman, C. S.; Beshers, G.; Hammerslag, D.; Kimball, J.; Kirslis, P. A.; Render, H.; Richards, P.; Terwilliger, R.
1984-01-01
The project to automate the management of software production systems is described. The SAGA system is a software environment that is designed to support most of the software development activities that occur in a software lifecycle. The system can be configured to support specific software development applications using given programming languages, tools, and methodologies. Meta-tools are provided to ease configuration. Several major components of the SAGA system are completed to prototype form. The construction methods are described.
An expert system for municipal solid waste management simulation analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hsieh, M.C.; Chang, N.B.
1996-12-31
Optimization techniques were usually used to model the complicated metropolitan solid waste management system to search for the best dynamic combination of waste recycling, facility siting, and system operation, where sophisticated and well-defined interrelationship are required in the modeling process. But this paper applied the Concurrent Object-Oriented Simulation (COOS), a new simulation software construction method, to bridge the gap between the physical system and its computer representation. The case study of Kaohsiung solid waste management system in Taiwan is prepared for the illustration of the analytical methodology of COOS and its implementation in the creation of an expert system.
Kuwabara, Cleuza Catsue Takeda; Evora, Yolanda Dora Martinez; de Oliveira, Márcio Mattos Borges
2010-01-01
With the continuous incorporation of health technologies, hospital risk management should be implemented to systemize the monitoring of adverse effects, performing actions to control and eliminate their damage. As part of these actions, Technovigilance is active in the procedures of acquisition, use and quality control of health products and equipment. This study aimed to construct and validate an instrument to evaluate medical-hospital products. This is a quantitative, exploratory, longitudinal and methodological development study, based on the Six Sigma quality management model, which has as its principle basis the component stages of the DMAIC Cycle. For data collection and content validation, the Delphi technique was used with professionals from the Brazilian Sentinel Hospital Network. It was concluded that the instrument developed permitted the evaluation of the product, differentiating between the results of the tested brands, in line with the initial study goal of qualifying the evaluations performed.
NASA Astrophysics Data System (ADS)
Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.
2018-05-01
Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.
NASA Astrophysics Data System (ADS)
Banfi, F.
2017-08-01
Architecture, Engineering and Construction (AEC) industry is facing a great process re-engineering of the management procedures for new constructions, and recent studies show a significant increase of the benefits obtained through the use of Building Information Modelling (BIM) methodologies. This innovative approach needs new developments for information and communication technologies (ICT) in order to improve cooperation and interoperability among different actors and scientific disciplines. Accordingly, BIM could be described as a new tool capable of collect/analyse a great quantity of information (Big data) and improve the management of building during its life of cycle (LC). The main aim of this research is, in addition to a reduction in production times, reduce physical and financial resources (economic impact), to demonstrate how technology development can support a complex generative process with new digital tools (modelling impact). This paper reviews recent BIMs of different historical Italian buildings such as Basilica of Collemaggio in L'Aquila, Masegra Castle in Sondrio, Basilica of Saint Ambrose in Milan and Visconti Bridge in Lecco and carries out a methodological analysis to optimize output information and results combining different data and modelling techniques into a single hub (cloud service) through the use of new Grade of Generation (GoG) and Information (GoI) (management impact). Finally, this study shows the need to orient GoG and GoI for a different type of analysis, which requires a high Grade of Accuracy (GoA) and an Automatic Verification System (AVS ) at the same time.
Toward unification of taxonomy databases in a distributed computer environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kitakami, Hajime; Tateno, Yoshio; Gojobori, Takashi
1994-12-31
All the taxonomy databases constructed with the DNA databases of the international DNA data banks are powerful electronic dictionaries which aid in biological research by computer. The taxonomy databases are, however not consistently unified with a relational format. If we can achieve consistent unification of the taxonomy databases, it will be useful in comparing many research results, and investigating future research directions from existent research results. In particular, it will be useful in comparing relationships between phylogenetic trees inferred from molecular data and those constructed from morphological data. The goal of the present study is to unify the existent taxonomymore » databases and eliminate inconsistencies (errors) that are present in them. Inconsistencies occur particularly in the restructuring of the existent taxonomy databases, since classification rules for constructing the taxonomy have rapidly changed with biological advancements. A repair system is needed to remove inconsistencies in each data bank and mismatches among data banks. This paper describes a new methodology for removing both inconsistencies and mismatches from the databases on a distributed computer environment. The methodology is implemented in a relational database management system, SYBASE.« less
Software engineering and Ada in design
NASA Technical Reports Server (NTRS)
Oneill, Don
1986-01-01
Modern software engineering promises significant reductions in software costs and improvements in software quality. The Ada language is the focus for these software methodology and tool improvements. The IBM FSD approach, including the software engineering practices that guide the systematic design and development of software products and the management of the software process are examined. The revised Ada design language adaptation is revealed. This four level design methodology is detailed including the purpose of each level, the management strategy that integrates the software design activity with the program milestones, and the technical strategy that maps the Ada constructs to each level of design. A complete description of each design level is provided along with specific design language recording guidelines for each level. Finally, some testimony is offered on education, tools, architecture, and metrics resulting from project use of the four level Ada design language adaptation.
Analysis of noise on construction sites of high-rise buildings.
Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P
2012-01-01
In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.
Correlation between safety climate and contractor safety assessment programs in construction
Sparer, EH1; Murphy, LA; Taylor, KM; Dennerlein, Jt
2015-01-01
Background Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Methods 401 construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. Results There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers’ safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. Conclusions A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. PMID:24038403
Developing mobile- and BIM-based integrated visual facility maintenance management system.
Lin, Yu-Cheng; Su, Yu-Chih
2013-01-01
Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.
Ajayi, Saheed O; Oyedele, Lukumon O
2018-05-01
Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.
Knowledge, Management, and Learning when the Context of the Organization Is Planetary
ERIC Educational Resources Information Center
Collen, Arne
2012-01-01
Purpose: The purpose of this article is to expound the view that knowledge of a special kind, which the author terms open knowledge, has a central place in the conduct of human activities at the global level. Design/methodology/approach: The author advances the concept of open knowledge in a global context by examining key constructs in the field,…
ERIC Educational Resources Information Center
Douglas-Lenders, Rachel Claire; Holland, Peter Jeffrey; Allen, Belinda
2017-01-01
Purpose: The purpose of this paper is to examine the impact of experiential simulation-based learning of employee self-efficacy. Design/Methodology/Approach: The research approach is an exploratory case study of a group of trainees from the same organisation. Using a quasi-experiment, one group, pre-test-post-test design (Tharenou et al., 2007), a…
ERIC Educational Resources Information Center
Douglas-Lenders, Rachel Claire; Holland, Peter Jeffrey; Allen, Belinda
2017-01-01
Purpose: The purpose of this paper is to examine the impact of experiential simulation-based learning of employee self-efficacy. Design/Methodology/Approach: The research approach is an exploratory case study of a group of trainees from the same organisation. Using a quasi-experiment, one group, pre-test-post-test design (Tharenou et al., 2007), a…
SNMG: a social-level norm-based methodology for macro-governing service collaboration processes
NASA Astrophysics Data System (ADS)
Gao, Ji; Lv, Hexin; Jin, Zhiyong; Xu, Ping
2017-08-01
In order to adapt to the accelerative open tendency of collaborations between enterprises, this paper proposes a Social-level Norm-based methodology for Macro-Governing service collaboration processes, called SNMG, to regulate and control the social-level visible macro-behaviors of the social individuals participating in collaborations. SNMG not only can remove effectively the uncontrollability hindrance confronted with by open social activities, but also enables across-management-domain collaborations to be implemented by uniting the centralized controls of social individuals for respective social activities. Therefore, this paper provides a brand-new system construction mode to promote the development and large-scale deployment of service collaborations.
2016-01-01
Political risk is identified as a dominant risk category of disaster risk management (DRM) which could negatively affect the success of those measures implemented to reduce disaster risk. Key to political risk is the construct of national identity which, if poorly constructed, could greatly contribute to political risk. This article proposed a tool to measure the construct of national identity and to provide recommendations to strengthen the construct in order to mitigate the exacerbating influence it may have on political risk and ultimately on DRM. The design of the measurement tool consisted of a mixed methodological approach employing both quantitative and qualitative data. The data collection instruments included a literature review (which is shortly provided in the previous sections) and an empirical study that utilised data obtained through structured questionnaires. Although the results of the proposed measuring instrument did not include a representative sample of all the cultures in South Africa, the results alluded to different levels for the construction of national identity among black and white respondents, possibly because of different ideological expectations among these groups. The results of the study should be considered as a validation of the measuring tool and not necessarily of the construct of national identity in South Africa. The measuring tool is thus promising for future studies to reduce political risk and ultimately disaster risk.
Wilk, Szymon; Michalowski, Martin; Michalowski, Wojtek; Hing, Marisela Mainegra; Farion, Ken
2011-01-01
This paper describes a new methodological approach to reconciling adverse and contradictory activities (called points of contention) occurring when a patient is managed according to two or more concurrently used clinical practice guidelines (CPGs). The need to address these inconsistencies occurs when a patient with more than one disease, each of which is a comorbid condition, has to be managed according to different treatment regimens. We propose an automatic procedure that constructs a mathematical guideline model using the Constraint Logic Programming (CLP) methodology, uses this model to identify and mitigate encountered points of contention, and revises the considered CPGs accordingly. The proposed procedure is used as an alerting mechanism and coupled with a guideline execution engine warns the physician about potential problems with the concurrent application of two or more guidelines. We illustrate the operation of our procedure in a clinical scenario describing simultaneous use of CPGs for duodenal ulcer and transient ischemic attack.
A Novel Quantitative Approach to Concept Analysis: The Internomological Network
Cook, Paul F.; Larsen, Kai R.; Sakraida, Teresa J.; Pedro, Leli
2012-01-01
Background When a construct such as patients’ transition to self-management of chronic illness is studied by researchers across multiple disciplines, the meaning of key terms can become confused. This results from inherent problems in language where a term can have multiple meanings (polysemy) and different words can mean the same thing (synonymy). Objectives To test a novel quantitative method for clarifying the meaning of constructs by examining the similarity of published contexts in which they are used. Method Published terms related to the concept transition to self-management of chronic illness were analyzed using the internomological network (INN), a type of latent semantic analysis to calculate the mathematical relationships between constructs based on the contexts in which researchers use each term. This novel approach was tested by comparing results to those from concept analysis, a best-practice qualitative approach to clarifying meanings of terms. By comparing results of the two methods, the best synonyms of transition to self-management, as well as key antecedent, attribute, and consequence terms, were identified. Results Results from INN analysis were consistent with those from concept analysis. The potential synonyms self-management, transition, and adaptation had the greatest utility. Adaptation was the clearest overall synonym, but had lower cross-disciplinary use. The terms coping and readiness had more circumscribed meanings. The INN analysis confirmed key features of transition to self-management, and suggested related concepts not found by the previous review. Discussion The INN analysis is a promising novel methodology that allows researchers to quantify the semantic relationships between constructs. The method works across disciplinary boundaries, and may help to integrate the diverse literature on self-management of chronic illness. PMID:22592387
Correlation between safety climate and contractor safety assessment programs in construction.
Sparer, Emily H; Murphy, Lauren A; Taylor, Kathryn M; Dennerlein, Jack T
2013-12-01
Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Four hundred and one construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers' safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. Am. J. Ind. Med. 56:1463-1472, 2013. © 2013 Wiley Periodicals, Inc. © 2013 Wiley Periodicals, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arrieta, Gabriela, E-mail: tonina1903@hotmail.com; Requena, Ignacio, E-mail: requena@decsai.ugr.es; Toro, Javier, E-mail: jjtoroca@unal.edu.co
Treatment and final disposal of Municipal Solid Waste can have a significant role in the generation of negative environmental impacts. As a prevention strategy, such activities are subjected to the process of Environmental Impact Assessment (EIA). Still, the follow-up of Environmental Management Plans or mitigation measures is limited, for one due to a lack of methodological approaches. In searching for possibilities, the University of Granada (Spain) developed a diagnostic methodology named EVIAVE, which allows one to quantify, by means of indexes, the environmental impact of landfills in view of their location and the conditions of exploitation. EVIAVE is applicable withinmore » the legal framework of the European Union and can be adapted to the environmental and legal conditions of other countries. This study entails its adaptation in Colombia, for the follow-up and control of the EIA process for landfills. Modifications involved inclusion of the environmental elements flora and fauna, and the evaluation of the environmental descriptors in agreement with the concept of vulnerability. The application of the modified EVIAVE in Colombian landfills allowed us to identify the elements affected by the operating conditions and maintenance. It may be concluded that this methodology is viable and effective for the follow-up and environmental control of EIA processes for landfills, and to analyze the associated risks, as it takes into account related environmental threats and vulnerabilities. - Highlights: • A modified methodology is used to monitor and follow-up environmental impacts in landfills. • The improved methodology includes the Vulnerability of Flora and Fauna to evaluate environmental impact of landfills. • The methodology serves to identify and evaluate the sources of risk generated in the construction and siting of landfills. • Environmental vulnerability indicators improve effectiveness of the control and follow-up phases of landfill management. • The follow-up of environmental management plans may help diminish the implementation gap in Environmental Impact Assessment.« less
NASA Astrophysics Data System (ADS)
Nowotarski, Piotr; Paslawski, Jerzy; Wysocki, Bartosz
2017-12-01
Ground works are one of the first processes connected with erecting structures. Based on ground conditions like the type of soil or level of underground water different types and solutions for foundations are designed. Foundations are the base for the buildings, and their proper design and execution is the key for the long and faultless use of the whole construction and might influence on the future costs of the eventual repairs (especially when ground water level is high, and there is no proper water insulation made). Article presents the introduction of chosen Lean Management tools for quality improvement of the process of ground works based on the analysis made on the construction site of vehicle control station located in Poznan, Poland. Processes assessment is made from different perspectives taking into account that 3 main groups of workers were directly involved in the process: blue collar-workers, site manager and site engineers. What is more comparison is made on the 3 points of view to the problems that might occur during this type of works, with details analysis on the causes of such situation? Authors presents also the change of approach of workers directly involved in the mentioned processes regarding introduction of Lean Management methodology, which illustrates the problem of scepticism for new ideas of the people used to perform works and actions in traditional way. Using Lean Management philosophy in construction is a good idea to streamline processes in company, get rid of constantly recurring problems, and in this way improve the productivity and quality of executed activities. Performed analysis showed that different groups of people have very different idea and opinion on the problems connected with executing the same process - ground works and only having full picture of the situation (especially in construction processes) management can take proper problems-preventing actions that consequently can influence on the amount of waste generated on the construction cite which positively influence on the external environment.
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
Trend of the research on construction and demolition waste management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yuan Hongping, E-mail: hpyuan2005@gmail.com; Shen Liyin, E-mail: bsshen@polyu.edu.hk
2011-04-15
Research interests in addressing construction and demolition (C and D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C and D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibitmore » an increasing research interest in C and D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C and D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C and D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C and D waste management research, and this is considered a major methodology for future research in the discipline. C and D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C and D waste management has emerged as a new challenging topic.« less
Trend of the research on construction and demolition waste management.
Yuan, Hongping; Shen, Liyin
2011-04-01
Research interests in addressing construction and demolition (C&D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C&D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C&D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C&D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C&D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C&D waste management research, and this is considered a major methodology for future research in the discipline. C&D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C&D waste management has emerged as a new challenging topic. Copyright © 2010 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Komosko, Vladimir; Serebryakov, Sergey; Strokov, Vladimir
2017-12-01
Currently, the increase in construction efficiency in the world is associated with the introduction and development of information modelling of construction objects (BIM-technology). The BIM-technology is a process of collective creation and use of information about a structure that forms the basis for all decisions throughout the life cycle of an object. The BIM-technology with the help of a number of software products provides automation of production, it does not provide a methodology for the introduction of these products. The article describes the technology of 8-level responsibility, which is guaranteed to give systematically a new quality of management in construction, related to the requirements of the Russian Government Decree No. 87 of February 16, 2008. The technology of 8-level responsibility (8LR) in the detailed specification of GD No. 87, (territory, construction stage, master plan object, section (part) of the project) extends the number of inseparable levels to 8 (part of the object, element, mark, position), where the “position” is the last indivisible detail of the object. There is reason to argue that the use of the “8LR Technology” in addition to the BIM-technology will provide a synergistic effect and will remove a number of obstacles to the BIM introduction in Russia and system control in the construction and operation of objects of any complexity in Russia.
BIM Methodology Approach to Infrastructure Design: Case Study of Paniga Tunnel
NASA Astrophysics Data System (ADS)
Osello, Anna; Rapetti, Niccolò; Semeraro, Francesco
2017-10-01
Nowadays, the implementation of Building Information Modelling (BIM) in civil design represent a new challenge for the AECO (Architecture, Engineering, Construction, Owner and Operator) world, which will involve the interest of many researchers in the next years. It is due to the incentives of Public Administration and European Directives that aim to improve the efficiency and to enhance a better management of the complexity of infrastructure projects. For these reasons, the goal of this research is to propose a methodology for the use of BIM in a tunnel project, analysing the definition of a correct level of detail (LOD) and the possibility to share information via interoperability for FEM analysis.
Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System
Su, Yu-Chih
2013-01-01
Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool. PMID:24227995
2012-09-01
supported by the National Science Foundation (NSF) IGERT 9972762, the Army Research Institute (ARI) W91WAW07C0063, the Army Research Laboratory (ARL/CTA...prediction models in AutoMap .................................................. 144 Figure 13: Decision Tree for prediction model selection in...generated for nationally funded initiatives and made available through the Linguistic Data Consortium (LDC). An overview of these datasets is provided in
Coastal zone management with stochastic multi-criteria analysis.
Félix, A; Baquerizo, A; Santiago, J M; Losada, M A
2012-12-15
The methodology for coastal management proposed in this study takes into account the physical processes of the coastal system and the stochastic nature of forcing agents. Simulation techniques are used to assess the uncertainty in the performance of a set of predefined management strategies based on different criteria representing the main concerns of interest groups. This statistical information as well as the distribution function that characterizes the uncertainty regarding the preferences of the decision makers is fed into a stochastic multi-criteria acceptability analysis that provides the probability of alternatives obtaining certain ranks and also calculates the preferences of a typical decision maker who supports an alternative. This methodology was applied as a management solution for Playa Granada in the Guadalfeo River Delta (Granada, Spain), where the construction of a dam in the river basin is causing severe erosion. The analysis of shoreline evolution took into account the coupled action of atmosphere, ocean, and land agents and their intrinsic stochastic character. This study considered five different management strategies. The criteria selected for the analysis were the economic benefits for three interest groups: (i) indirect beneficiaries of tourist activities; (ii) beach homeowners; and (iii) the administration. The strategies were ranked according to their effectiveness, and the relative importance given to each criterion was obtained. Copyright © 2012 Elsevier Ltd. All rights reserved.
Methodology for quantification of waste generated in Spanish railway construction works
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guzman Baez, Ana de; Villoria Saez, Paola; Rio Merino, Mercedes del
Highlights: Black-Right-Pointing-Pointer Two equations for C and D waste estimation in railway construction works are developed. Black-Right-Pointing-Pointer Mixed C and D waste is the most generated category during railway construction works. Black-Right-Pointing-Pointer Tunnel construction is essential to quantify the waste generated during the works. Black-Right-Pointing-Pointer There is a relationship between C and D waste generated and railway functional units. Black-Right-Pointing-Pointer The methodology proposed can be used to obtain new constants for other areas. - Abstract: In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C and D) waste. Specifically, in 2006,more » Spain generated roughly 47 million tons of C and D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C and D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C and D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C and D waste management in railway projects, by developing a model for C and D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C and D waste likely to be generated in railway construction projects, including the category of C and D waste generated for the entire project.« less
Increasing accuracy in the assessment of motion sickness: A construct methodology
NASA Technical Reports Server (NTRS)
Stout, Cynthia S.; Cowings, Patricia S.
1993-01-01
The purpose is to introduce a new methodology that should improve the accuracy of the assessment of motion sickness. This construct methodology utilizes both subjective reports of motion sickness and objective measures of physiological correlates to assess motion sickness. Current techniques and methods used in the framework of a construct methodology are inadequate. Current assessment techniques for diagnosing motion sickness and space motion sickness are reviewed, and attention is called to the problems with the current methods. Further, principles of psychophysiology that when applied will probably resolve some of these problems are described in detail.
Methodology discourses as boundary work in the construction of engineering education.
Beddoes, Kacey
2014-04-01
Engineering education research is a new field that emerged in the social sciences over the past 10 years. This analysis of engineering education research demonstrates that methodology discourses have played a central role in the construction and development of the field of engineering education, and that they have done so primarily through boundary work. This article thus contributes to science and technology studies literature by examining the role of methodology discourses in an emerging social science field. I begin with an overview of engineering education research before situating the case within relevant bodies of literature on methodology discourses and boundary work. I then identify two methodology discourses--rigor and methodological diversity--and discuss how they contribute to the construction and development of engineering education research. The article concludes with a discussion of how the findings relate to prior research on methodology discourses and boundary work and implications for future research.
DB4US: A Decision Support System for Laboratory Information Management.
Carmona-Cejudo, José M; Hortas, Maria Luisa; Baena-García, Manuel; Lana-Linati, Jorge; González, Carlos; Redondo, Maximino; Morales-Bueno, Rafael
2012-11-14
Until recently, laboratory automation has focused primarily on improving hardware. Future advances are concentrated on intelligent software since laboratories performing clinical diagnostic testing require improved information systems to address their data processing needs. In this paper, we propose DB4US, an application that automates information related to laboratory quality indicators information. Currently, there is a lack of ready-to-use management quality measures. This application addresses this deficiency through the extraction, consolidation, statistical analysis, and visualization of data related to the use of demographics, reagents, and turn-around times. The design and implementation issues, as well as the technologies used for the implementation of this system, are discussed in this paper. To develop a general methodology that integrates the computation of ready-to-use management quality measures and a dashboard to easily analyze the overall performance of a laboratory, as well as automatically detect anomalies or errors. The novelty of our approach lies in the application of integrated web-based dashboards as an information management system in hospital laboratories. We propose a new methodology for laboratory information management based on the extraction, consolidation, statistical analysis, and visualization of data related to demographics, reagents, and turn-around times, offering a dashboard-like user web interface to the laboratory manager. The methodology comprises a unified data warehouse that stores and consolidates multidimensional data from different data sources. The methodology is illustrated through the implementation and validation of DB4US, a novel web application based on this methodology that constructs an interface to obtain ready-to-use indicators, and offers the possibility to drill down from high-level metrics to more detailed summaries. The offered indicators are calculated beforehand so that they are ready to use when the user needs them. The design is based on a set of different parallel processes to precalculate indicators. The application displays information related to tests, requests, samples, and turn-around times. The dashboard is designed to show the set of indicators on a single screen. DB4US was deployed for the first time in the Hospital Costa del Sol in 2008. In our evaluation we show the positive impact of this methodology for laboratory professionals, since the use of our application has reduced the time needed for the elaboration of the different statistical indicators and has also provided information that has been used to optimize the usage of laboratory resources by the discovery of anomalies in the indicators. DB4US users benefit from Internet-based communication of results, since this information is available from any computer without having to install any additional software. The proposed methodology and the accompanying web application, DB4US, automates the processing of information related to laboratory quality indicators and offers a novel approach for managing laboratory-related information, benefiting from an Internet-based communication mechanism. The application of this methodology has been shown to improve the usage of time, as well as other laboratory resources.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharp, J.K.
1997-11-01
This seminar describes a process and methodology that uses structured natural language to enable the construction of precise information requirements directly from users, experts, and managers. The main focus of this natural language approach is to create the precise information requirements and to do it in such a way that the business and technical experts are fully accountable for the results. These requirements can then be implemented using appropriate tools and technology. This requirement set is also a universal learning tool because it has all of the knowledge that is needed to understand a particular process (e.g., expense vouchers, projectmore » management, budget reviews, tax, laws, machine function).« less
Solidification/stabilization of dredged marine sediments for road construction.
Wang, Dong Xing; Abriak, Nor Edine; Zentar, Rachid; Xu, WeiYa
2012-01-01
Cement/lime-based solidification is an environmentally sound solution for the management of dredged marine sediments, instead of traditional solutions such as immersion. Based on the mineralogical composition and physical characteristics of Dunkirk sediments, the effects of cement and lime are assessed through Atterberg limits, modified Proctor compaction, unconfined compressive strength and indirect tensile strength tests. The variation of Atterberg limits and the improvement in strength are discussed at different binder contents. The potential of sediments solidified with cement or lime for road construction is evaluated through a proposed methodology from two aspects: I-CBR value and material classification. The test results show the feasibility of solidified dredged sediments for beneficial use as a material in road construction. Cement is superior to lime in terms of strength improvement, and adding 6% cement is an economic and reasonable method to stabilize fine sediments.
NASA Technical Reports Server (NTRS)
Caines, P. E.
1999-01-01
The work in this research project has been focused on the construction of a hierarchical hybrid control theory which is applicable to flight management systems. The motivation and underlying philosophical position for this work has been that the scale, inherent complexity and the large number of agents (aircraft) involved in an air traffic system imply that a hierarchical modelling and control methodology is required for its management and real time control. In the current work the complex discrete or continuous state space of a system with a small number of agents is aggregated in such a way that discrete (finite state machine or supervisory automaton) controlled dynamics are abstracted from the system's behaviour. High level control may then be either directly applied at this abstracted level, or, if this is in itself of significant complexity, further layers of abstractions may be created to produce a system with an acceptable degree of complexity at each level. By the nature of this construction, high level commands are necessarily realizable at lower levels in the system.
2012-01-01
networks has become fast , cheap, and easy (Shapiro, 1971; Trigg & Weiser, 1986). Modern information and communication technologies, such as the internet...However, once the model is learned, inference time is not subject to this constraint. Therefore, applying the model in end-user applications is fast ...products that facilitate the fast collection and assessment of these networks. For the purpose of analyzing socio-technical networks of geopolitical
Technology of combined chemical-mechanical fabrication of durable coatings
NASA Astrophysics Data System (ADS)
Smolentsev, V. P.; Ivanov, V. V.; Portnykh, A. I.
2018-03-01
The article presents the scientific fundamentals of methodology for calculating the modes and structuring the technological processes of combined chemical-mechanical fabrication of durable coatings. It is shown that they are based on classical patterns, describing the processes of simultaneous chemical and mechanical impact. The paper demonstrates the possibility of structuring a technological process, taking into account the systematic approach to impact management and strengthening the reciprocal positive influence of each impact upon the combined process. The combined processes have been planned for fabricating the model types of chemical-mechanical coatings of durable products in machine construction. The planning methodology is underpinned by a scientific hypothesis of a single source of impact management through energy potential of process components themselves, or by means of external energy supply through mechanical impact. The control of it is fairly thoroughly studied in the case of pulsed external strikes of hard pellets, similar to processes of vibroimpact hardening, thoroughly studied and mastered in many scientific schools of Russia.
Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J
2011-12-01
The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.
Wilk, Szymon; Michalowski, Martin; Michalowski, Wojtek; Hing, Marisela Mainegra; Farion, Ken
2011-01-01
This paper describes a new methodological approach to reconciling adverse and contradictory activities (called points of contention) occurring when a patient is managed according to two or more concurrently used clinical practice guidelines (CPGs). The need to address these inconsistencies occurs when a patient with more than one disease, each of which is a comorbid condition, has to be managed according to different treatment regimens. We propose an automatic procedure that constructs a mathematical guideline model using the Constraint Logic Programming (CLP) methodology, uses this model to identify and mitigate encountered points of contention, and revises the considered CPGs accordingly. The proposed procedure is used as an alerting mechanism and coupled with a guideline execution engine warns the physician about potential problems with the concurrent application of two or more guidelines. We illustrate the operation of our procedure in a clinical scenario describing simultaneous use of CPGs for duodenal ulcer and transient ischemic attack. PMID:22195153
Grau, P; Vanrolleghem, P; Ayesa, E
2007-01-01
In this paper, a new methodology for integrated modelling of the WWTP has been used for the construction of the Benchmark Simulation Model N degrees 2 (BSM2). The transformations-approach proposed in this methodology does not require the development of specific transformers to interface unit process models and allows the construction of tailored models for a particular WWTP guaranteeing the mass and charge continuity for the whole model. The BSM2 PWM constructed as case study, is evaluated by means of simulations under different scenarios and its validity in reproducing water and sludge lines in WWTP is demonstrated. Furthermore the advantages that this methodology presents compared to other approaches for integrated modelling are verified in terms of flexibility and coherence.
Insight into dementia care management using social-behavioral theory and mixed methods.
Connor, Karen; McNeese-Smith, Donna; van Servellen, Gwen; Chang, Betty; Lee, Martin; Cheng, Eric; Hajar, Abdulrahman; Vickrey, Barbara G
2009-01-01
For health organizations (private and public) to advance their care-management programs, to use resources effectively and efficiently, and to improve patient outcomes, it is germane to isolate and quantify care-management activities and to identify overarching domains. The aims of this study were to identify and report on an application of mixed methods of qualitative statistical techniques, based on a theoretical framework, and to construct variables for factor analysis and exploratory factor analytic steps for identifying domains of dementia care management. Care-management activity data were extracted from the care plans of 181 pairs of individuals (with dementia and their informal caregivers) who had participated in the intervention arm of a randomized controlled trial of a dementia care-management program. Activities were organized into types, using card-sorting methods, influenced by published theoretical constructs on self-efficacy and general strain theory. These activity types were mapped in the initial data set to construct variables for exploratory factor analysis. Principal components extraction with varimax and promax rotations was used to estimate the number of factors. Cronbach's alpha was calculated for the items in each factor to assess internal consistency reliability. The two-phase card-sorting technique yielded 45 activity types out of 450 unique activities. Exploratory factor analysis produced four care-management domains (factors): behavior management, clinical strategies and caregiver support, community agency, and safety. Internal consistency reliability (Cronbach's alpha) of items for each factor ranged from.63 for the factor "safety" to.89 for the factor "behavior management" (Factor 1). Applying a systematic method to a large set of care-management activities can identify a parsimonious number of higher order categories of variables and factors to guide the understanding of dementia care-management processes. Further application of this methodology in outcome analyses and to other data sets is necessary to test its practicality.
Cyrino, Eliana Goldfarb; Toralles-Pereira, Maria Lúcia
2004-01-01
Considering the changes in teaching in the health field and the demand for new ways of dealing with knowledge in higher learning, the article discusses two innovative methodological approaches: problem-based learning (PBL) and problematization. Describing the two methods' theoretical roots, the article attempts to identify their main foundations. As distinct proposals, both contribute to a review of the teaching and learning process: problematization, focused on knowledge construction in the context of the formation of a critical awareness; PBL, focused on cognitive aspects in the construction of concepts and appropriation of basic mechanisms in science. Both problematization and PBL lead to breaks with the traditional way of teaching and learning, stimulating participatory management by actors in the experience and reorganization of the relationship between theory and practice. The critique of each proposal's possibilities and limits using the analysis of their theoretical and methodological foundations leads us to conclude that pedagogical experiences based on PBL and/or problematization can represent an innovative trend in the context of health education, fostering breaks and more sweeping changes.
Q-Sample Construction: A Critical Step for a Q-Methodological Study.
Paige, Jane B; Morin, Karen H
2016-01-01
Q-sample construction is a critical step in Q-methodological studies. Prior to conducting Q-studies, researchers start with a population of opinion statements (concourse) on a particular topic of interest from which a sample is drawn. These sampled statements are known as the Q-sample. Although literature exists on methodological processes to conduct Q-methodological studies, limited guidance exists on the practical steps to reduce the population of statements to a Q-sample. A case exemplar illustrates the steps to construct a Q-sample in preparation for a study that explored perspectives nurse educators and nursing students hold about simulation design. Experts in simulation and Q-methodology evaluated the Q-sample for readability, clarity, and for representativeness of opinions contained within the concourse. The Q-sample was piloted and feedback resulted in statement refinement. Researchers especially those undertaking Q-method studies for the first time may benefit from the practical considerations to construct a Q-sample offered in this article. © The Author(s) 2014.
Construct(ion) and Context: A Response to Methodological Issues in Studying Character
ERIC Educational Resources Information Center
Deutsch, Nancy L.
2017-01-01
In this article, I respond to Noel Card's "Methodological Issues in Measuring the Development of Character." I focus on the ways in which social scientific knowledge represents human constructions of the world and the implications of this stance for the measurement of character. Further, I consider how context influences those…
Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian
2007-03-01
Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
Application of Bayesian and cost benefit risk analysis in water resources management
NASA Astrophysics Data System (ADS)
Varouchakis, E. A.; Palogos, I.; Karatzas, G. P.
2016-03-01
Decision making is a significant tool in water resources management applications. This technical note approaches a decision dilemma that has not yet been considered for the water resources management of a watershed. A common cost-benefit analysis approach, which is novel in the risk analysis of hydrologic/hydraulic applications, and a Bayesian decision analysis are applied to aid the decision making on whether or not to construct a water reservoir for irrigation purposes. The alternative option examined is a scaled parabolic fine variation in terms of over-pumping violations in contrast to common practices that usually consider short-term fines. The methodological steps are analytically presented associated with originally developed code. Such an application, and in such detail, represents new feedback. The results indicate that the probability uncertainty is the driving issue that determines the optimal decision with each methodology, and depending on the unknown probability handling, each methodology may lead to a different optimal decision. Thus, the proposed tool can help decision makers to examine and compare different scenarios using two different approaches before making a decision considering the cost of a hydrologic/hydraulic project and the varied economic charges that water table limit violations can cause inside an audit interval. In contrast to practices that assess the effect of each proposed action separately considering only current knowledge of the examined issue, this tool aids decision making by considering prior information and the sampling distribution of future successful audits.
DB4US: A Decision Support System for Laboratory Information Management
Hortas, Maria Luisa; Baena-García, Manuel; Lana-Linati, Jorge; González, Carlos; Redondo, Maximino; Morales-Bueno, Rafael
2012-01-01
Background Until recently, laboratory automation has focused primarily on improving hardware. Future advances are concentrated on intelligent software since laboratories performing clinical diagnostic testing require improved information systems to address their data processing needs. In this paper, we propose DB4US, an application that automates information related to laboratory quality indicators information. Currently, there is a lack of ready-to-use management quality measures. This application addresses this deficiency through the extraction, consolidation, statistical analysis, and visualization of data related to the use of demographics, reagents, and turn-around times. The design and implementation issues, as well as the technologies used for the implementation of this system, are discussed in this paper. Objective To develop a general methodology that integrates the computation of ready-to-use management quality measures and a dashboard to easily analyze the overall performance of a laboratory, as well as automatically detect anomalies or errors. The novelty of our approach lies in the application of integrated web-based dashboards as an information management system in hospital laboratories. Methods We propose a new methodology for laboratory information management based on the extraction, consolidation, statistical analysis, and visualization of data related to demographics, reagents, and turn-around times, offering a dashboard-like user web interface to the laboratory manager. The methodology comprises a unified data warehouse that stores and consolidates multidimensional data from different data sources. The methodology is illustrated through the implementation and validation of DB4US, a novel web application based on this methodology that constructs an interface to obtain ready-to-use indicators, and offers the possibility to drill down from high-level metrics to more detailed summaries. The offered indicators are calculated beforehand so that they are ready to use when the user needs them. The design is based on a set of different parallel processes to precalculate indicators. The application displays information related to tests, requests, samples, and turn-around times. The dashboard is designed to show the set of indicators on a single screen. Results DB4US was deployed for the first time in the Hospital Costa del Sol in 2008. In our evaluation we show the positive impact of this methodology for laboratory professionals, since the use of our application has reduced the time needed for the elaboration of the different statistical indicators and has also provided information that has been used to optimize the usage of laboratory resources by the discovery of anomalies in the indicators. DB4US users benefit from Internet-based communication of results, since this information is available from any computer without having to install any additional software. Conclusions The proposed methodology and the accompanying web application, DB4US, automates the processing of information related to laboratory quality indicators and offers a novel approach for managing laboratory-related information, benefiting from an Internet-based communication mechanism. The application of this methodology has been shown to improve the usage of time, as well as other laboratory resources. PMID:23608745
Rodrigues, Rita de Cassia Vieira; Peres, Heloisa Helena Ciqueto
2013-02-01
The objective of this study was to develop an educational software program for nursing continuing education. This program was intended to incorporate applied methodological research that used the learning management system methodology created by Galvis Panqueva in association with contextualized instructional design for software design. As a result of this study, we created a computerized educational product (CEP) called ENFNET. This study describes all the necessary steps taken during its development. The creation of a CEP demands a great deal of study, dedication and investment as well as the necessity of specialized technical personnel to construct it. At the end of the study, the software was positively evaluated and shown to be a useful strategy to help users in their education, skills development and professional training.
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
ERIC Educational Resources Information Center
Prime, Heather; Perlman, Michal; Tackett, Jennifer L.; Jenkins, Jennifer M.
2014-01-01
Research Findings: The goal of this study was to develop a construct of sibling cognitive sensitivity, which describes the extent to which children take their siblings' knowledge and cognitive abilities into account when working toward a joint goal. In addition, the study compared 2 coding methodologies for measuring the construct: a thin…
Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin
2012-03-01
During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented in practice. Copyright © 2011 Elsevier Ltd. All rights reserved.
2018-03-01
We apply our methodology to the criticism text written in the flight-training program student evaluations in order to construct a model that...factors. We apply our methodology to the criticism text written in the flight-training program student evaluations in order to construct a model...9 D. BINARY CLASSIFICATION AND FEATURE SELECTION ..........11 III. METHODOLOGY
Gis-Based Accessibility Analysis of Urban Emergency Shelters: the Case of Adana City
NASA Astrophysics Data System (ADS)
Unal, M.; Uslu, C.
2016-10-01
Accessibility analysis of urban emergency shelters can help support urban disaster prevention planning. Pre-disaster emergency evacuation zoning has become a significant topic on disaster prevention and mitigation research. In this study, we assessed the level of serviceability of urban emergency shelters within maximum capacity, usability, sufficiency and a certain walking time limit by employing spatial analysis techniques of GIS-Network Analyst. The methodology included the following aspects: the distribution analysis of emergency evacuation demands, the calculation of shelter space accessibility and the optimization of evacuation destinations. This methodology was applied to Adana, a city in Turkey, which is located within the Alpine-Himalayan orogenic system, the second major earthquake belt after the Pacific-Belt. It was found that the proposed methodology could be useful in aiding to understand the spatial distribution of urban emergency shelters more accurately and establish effective future urban disaster prevention planning. Additionally, this research provided a feasible way for supporting emergency management in terms of shelter construction, pre-disaster evacuation drills and rescue operations.
Cwikel, Julie; Hoban, Elizabeth
2005-11-01
The trafficking of women and children for work in the globalized sex industry is a global social problem. Quality data is needed to provide a basis for legislation, policy, and programs, but first, numerous research design, ethical, and methodological problems must be addressed. Research design issues in studying women trafficked for sex work (WTSW) include how to (a) develop coalitions to fund and support research, (b) maintain a critical stance on prostitution, and therefore WTSW (c) use multiple paradigms and methods to accurately reflect WTSW's reality, (d) present the purpose of the study, and (e) protect respondents' identities. Ethical issues include (a) complications with informed consent procedures, (b) problematic access to WTSW (c) loss of WTSW to follow-up, (d) inability to intervene in illegal acts or human rights violations, and (e) the need to maintain trustworthiness as researchers. Methodological issues include (a) constructing representative samples, (b) managing media interest, and (c) handling incriminating materials about law enforcement and immigration.
Oppong, Raymond; Nicholls, Elaine; Whitehurst, David G. T.; Hill, Susan; Hammond, Alison; Hay, Elaine M.; Dziedzic, Krysia
2015-01-01
Objectives. Evidence regarding the cost-effectiveness of joint protection and hand exercises for the management of hand OA is not well established. The primary aim of this study is to assess the cost-effectiveness (cost-utility) of these management options. In addition, given the absence of consensus regarding the conduct of economic evaluation alongside factorial trials, we compare different analytical methodologies. Methods. A trial-based economic evaluation to assess the cost-utility of joint protection only, hand exercises only and joint protection plus hand exercises compared with leaflet and advice was undertaken over a 12 month period from a UK National Health Service perspective. Patient-level mean costs and mean quality-adjusted life years (QALYs) were calculated for each trial arm. Incremental cost-effectiveness ratios (ICERs) were estimated and cost-effectiveness acceptability curves were constructed. The base case analysis used a within-the-table analysis methodology. Two further methods were explored: the at-the-margins approach and a regression-based approach with or without an interaction term. Results. Mean costs (QALYs) were £58.46 (s.d. 0.662) for leaflet and advice, £92.12 (s.d. 0.659) for joint protection, £64.51 (s.d. 0.681) for hand exercises and £112.38 (s.d. 0.658) for joint protection plus hand exercises. In the base case, hand exercises were the cost-effective option, with an ICER of £318 per QALY gained. Hand exercises remained the most cost-effective management strategy when adopting alternative methodological approaches. Conclusion. This is the first trial evaluating the cost-effectiveness of occupational therapy-supported approaches to self-management for hand OA. Our findings showed that hand exercises were the most cost-effective option. PMID:25339642
Lung cancer risk among construction workers in California, 1988-2007.
Calvert, Geoffrey M; Luckhaupt, Sara; Lee, Soo-Jeong; Cress, Rosemary; Schumacher, Pam; Shen, Rui; Tak, SangWoo; Deapen, Dennis
2012-05-01
Although lung cancer risks can vary by race/ethnicity and by construction occupation, these risks have not been examined extensively. This study analyzed 110,937 lung cancer cases identified from the California Cancer Registry between 1988 and 2007. Mean age at diagnosis, proportion diagnosed at an advanced stage, and proportion with 3-year survival were calculated for lung cancer cases employed in the construction industry. Case-control methodology was also used to assess the risk of lung cancer. Morbidity odds ratios (MORs) were estimated by conditional logistic regression. Construction workers were found to have a significantly elevated risk for all lung cancer combined (MOR = 1.57) and for each lung cancer histologic subtype examined. All construction occupations, except managers/engineers and supervisors, had a significantly elevated risk for all lung cancer combined. Roofers and welders had the highest risks for total lung cancer and for each of the histologic subtypes. Construction workers in each of the four race/ethnicity groups also had significantly increased lung cancer risks. Compared to non-construction workers, construction workers were diagnosed at an earlier age, at a more advanced stage, and had significantly lower 3-year survival, though differences were modest. These findings justify additional reductions in carcinogenic exposures in construction, and increased support for smoking cessation programs at construction sites. Copyright © 2012 Wiley Periodicals, Inc.
Richardson, Miles; Hunt, Thomas E; Richardson, Cassandra
2014-12-01
This paper presents a methodology to control construction task complexity and examined the relationships between construction performance and spatial and mathematical abilities in children. The study included three groups of children (N = 96); ages 7-8, 10-11, and 13-14 years. Each group constructed seven pre-specified objects. The study replicated and extended previous findings that indicated that the extent of component symmetry and variety, and the number of components for each object and available for selection, significantly predicted construction task difficulty. Results showed that this methodology is a valid and reliable technique for assessing and predicting construction play task difficulty. Furthermore, construction play performance predicted mathematical attainment independently of spatial ability.
Managing cognitive impairment in the elderly: conceptual, intervention and methodological issues.
Buckwalter, K C; Stolley, J M; Farran, C J
1999-11-11
With the aging of society, the incidence of dementia in the elderly is also increasing, and thus results in increased numbers of individuals with cognitive impairment. Nurses and other researchers have investigated issues concerning the management of cognitive impairment. This article highlights conceptual, intervention and methodological issues associated with this phenomenon. Cognitive change is a multivariate construct that includes alterations in a variety of information processing mechanisms such as problem solving ability, memory, perception, attention and learning, and judgement. Although there is a large body of research, conceptual, intervention and methodological issues remain. Much of the clinical research on cognitive impairment is atheoretical, with this issue only recently being addressed. While many clinical interventions have been proposed, few have been adequately tested. There are also various methodological concerns, such as small sample sizes and limited statistical power; study design issues (experimental vs. non-experimental), and internal and external validity problems. Clearly, additional research designed to intervene with these difficult behaviors is needed. A variety of psychosocial, environmental and physical parameters must be considered in the nursing care of persons with cognitive impairment. Special attention has been given to interventions associated with disruptive behaviors. Interventions are complex and knowledge must be integrated from both the biomedical and behavioral sciences in order to deal effectively with the numerous problems that can arise over a long and changing clinical course. Some researchers and clinicians have suggested that a new culture regarding dementia care is needed, one that focuses on changing attitudes and beliefs about persons with dementia and one that changes how organizations deliver that care. This review identifies key conceptual, intervention and methodological issues and recommends how these issues might be addressed in the future.
A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels
NASA Astrophysics Data System (ADS)
Liu, Guo-Feng; Feng, Xia-Ting; Feng, Guang-Liang; Chen, Bing-Rui; Chen, Dong-Fang; Duan, Shu-Qian
2016-08-01
Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900-2525 m (with a length of 11.6 km in total for D&B tunnels).
NASA Astrophysics Data System (ADS)
Vaynshtok, Natalia
2017-10-01
The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.
Harding, Keith; Benson, Erica E
2015-01-01
Standard operating procedures are a systematic way of making sure that biopreservation processes, tasks, protocols, and operations are correctly and consistently performed. They are the basic documents of biorepository quality management systems and are used in quality assurance, control, and improvement. Methodologies for constructing workflows and writing standard operating procedures and work instructions are described using a plant cryopreservation protocol as an example. This chapter is pertinent to other biopreservation sectors because how methods are written, interpreted, and implemented can affect the quality of storage outcomes.
Quantifying construction and demolition waste: an analytical review.
Wu, Zezhou; Yu, Ann T W; Shen, Liyin; Liu, Guiwen
2014-09-01
Quantifying construction and demolition (C&D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C&D waste generation at both regional and project levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C&D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested. Copyright © 2014 Elsevier Ltd. All rights reserved.
High-Order Hyperbolic Residual-Distribution Schemes on Arbitrary Triangular Grids
2015-06-22
Galerkin methodology formulated in the framework of the residual-distribution method. For both second- and third- 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND...construct these schemes based on the Low-Diffusion-A and the Streamwise-Upwind-Petrov-Galerkin methodology formulated in the framework of the residual...methodology formulated in the framework of the residual-distribution method. For both second- and third-order-schemes, we construct a fully implicit
Topical, Biological and Clinical Challenges in the Management of Patients with Acne Vulgaris
Al-Hammadi, Anwar; Al-Ismaily, Abla; Al-Ali, Sameer; Ramadurai, Rajesh; Jain, Rishi; McKinley-Grant, Lynn; Mughal, Tariq I.
2016-01-01
Acne vulgaris is one of the most common chronic inflammatory skin disorders among adolescents and young adults. It is associated with substantial morbidity and, rarely, with mortality. The exact worldwide incidence and prevalence are currently unknown. Current challenges involve improving understanding of the underlying pathophysiology of acne vulgaris and developing a practical treatment consensus. Expert panel discussions were held in 2013 and 2014 among a group of scientists and clinicians from the Omani and United Arab Emirate Dermatology Societies to ascertain the current optimal management of acne vulgaris, identify clinically relevant end-points and construct suitable methodology for future clinical trial designs. This article reviews the discussions of these sessions and recent literature on this topic. PMID:27226905
Engel, Lisa; Chui, Adora; Beaton, Dorcas E; Green, Robin E; Dawson, Deirdre R
2018-03-07
To critically appraise the measurement property evidence (ie, psychometric) for 8 observation-based financial management assessment instruments. Seven databases were searched in May 2015. Two reviewers used an independent decision-agreement process to select studies of measurement property evidence relevant to populations with adulthood acquired cognitive impairment, appraise the quality of the evidence, and extract data. Twenty-one articles were selected. This review used the COnsensus-based Standards for the selection of health Measurement Instruments review guidelines and 4-point tool to appraise evidence. After appraising the methodologic quality, the adequacy of results and volume of evidence per instrument were synthesized. Measurement property evidence with high risk of bias was excluded from the synthesis. The volume of measurement property evidence per instrument is low; most instruments had 1 to 3 included studies. Many included studies had poor methodologic quality per measurement property evidence area examined. Six of the 8 instruments reviewed had supporting construct validity/hypothesis-testing evidence of fair methodologic quality. There is a dearth of acceptable quality content validity, reliability, and responsiveness evidence for all 8 instruments. Rehabilitation practitioners assess financial management functions in adults with acquired cognitive impairments. However, there is limited published evidence to support using any of the reviewed instruments. Practitioners should exercise caution when interpreting the results of these instruments. This review highlights the importance of appraising the quality of measurement property evidence before examining the adequacy of the results and synthesizing the evidence. Copyright © 2018 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.
Treating without Seeing: Pain Management Practice in a Thai Context.
Chatchumni, Manaporn; Namvongprom, Ampaporn; Eriksson, Henrik; Mazaheri, Monir
2016-01-01
Pain management is a core nursing function, and it plays a key role in postoperative care. It is important to understand the cultural context of nursing practices and how this affects effective pain management. The aim of this study was to describe the professional and cultural framework within which pain management is practiced on a Thai surgical ward. Spradley's ethnographic methodology was used. Data were collected through 98.5 hours of field observations and interviews at a surgical ward in Thailand. Three themes were constructed that describe the way Thai nurses practiced pain management: (i) complex communications system to address pain and to respond to it, (ii) the essence of Thai-ness, and (iii) a passive approach to pain management. The results indicate that, in the response to discomfort and pain, better pain management will result if there is a shift from functional to patient-centered care. The nursing culture needs to be further researched and discussed, in order to set priorities in line with the goals of national and international organizations for improving postoperative care and promoting patient comfort.
Burman, Christopher J; Aphane, Marota; Mtapuri, Oliver; Delobelle, Peter
2015-01-01
The article describes a design journey that culminated in an HIV-Conversant Community Framework that is now being piloted in the Limpopo Province of South Africa. The objective of the initiative is to reduce the aggregate community viral load by building capacity at multiple scales that strengthens peoples' HIV-related navigational skill sets-while simultaneously opening a 'chronic situation' schema. The framework design is based upon a transdisciplinary methodological combination that synthesises ideas and constructs from complexity science and the management sciences as a vehicle through which to re-conceptualise HIV prevention. This resulted in a prototype that included the following constructs: managing HIV-prevention in a complex, adaptive epidemiological landscape; problematising and increasing the scope of the HIV knowledge armamentarium through education that focuses on the viral load and Langerhans cells; disruptive innovation and safe-fail probes followed by the facilitation of path creations and pattern management implementation techniques. These constructs are underpinned by a 'middle-ground' prevention approach which is designed to bridge the prevention 'fault line', enabling a multi-ontology conceptualisation of the challenge to be developed. The article concludes that stepping outside of the 'ordered' epistemological parameters of the existing prevention 'messaging' mind-set towards a more systemic approach that emphasises agency, structure and social practices as a contribution to 'ending AIDS by 2030' is worthy of further attention if communities are to engage more adaptively with the dynamic HIV landscape in South Africa.
Methodology for quantification of waste generated in Spanish railway construction works.
de Guzmán Báez, Ana; Villoria Sáez, Paola; del Río Merino, Mercedes; García Navarro, Justo
2012-05-01
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. Copyright © 2012 Elsevier Ltd. All rights reserved.
Factors influencing unsafe behaviors and accidents on construction sites: a review.
Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H
2014-01-01
Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.
Elementary students' engagement in failure-prone engineering design tasks
NASA Astrophysics Data System (ADS)
Andrews, Chelsea Joy
Although engineering education has been practiced at the undergraduate level for over a century, only fairly recently has the field broadened to include the elementary level; the pre-college division of the American Society of Engineering Education was established in 2003. As a result, while recent education standards require engineering in elementary schools, current studies are still filling in basic research on how best to design and implement elementary engineering activities. One area in need of investigation is how students engage with physical failure in design tasks. In this dissertation, I explore how upper elementary students engage in failure-prone engineering design tasks in an out-of-school environment. In a series of three empirical case studies, I look closely at how students evaluate failed tests and decide on changes to their design constructions, how their reasoning evolves as they repeatedly encounter physical failure, and how students and facilitators co-construct testing norms where repetitive failure is manageable. I also briefly investigate how students' engagement differs in a task that features near-immediate success. By closely examining student groups' discourse and their interactions with their design constructions, I found that these students: are able to engage in iteration and see failure-as-feedback with minimal externally-imposed structure; seem to be designing in a more sophisticated manner, attending to multiple causal factors, after experiencing repetitive failure; and are able to manage the stress and frustration of repetitive failure, provided the co-constructed testing norms of the workshop environment are supportive of failure management. These results have both pedagogical implications, in terms of how to create and facilitate design tasks, and methodological implications--namely, I highlight the particular insights afforded by a case study approach for analyzing engagement in design tasks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coty, J; Stevenson, M; Vogt, K A
The Detention Pond is a constructed and lined storm water treatment basin at Lawrence Livermore National Laboratory that serves multiple stakeholder objectives and programmatic goals. This paper examines the process and outcome involved in the development of a new management plan for the Detention Pond. The plan was created using a new ecosystem management tool, the Legacy Framework. This stakeholder-driven conceptual framework provides an interdisciplinary methodology for determining ecosystem health, appropriate management strategies, and sensitive indicators. The conceptual framework, the Detention Ponds project, and the use of the framework in the context of the project, are described and evaluated, andmore » evaluative criteria for this and other ecosystem management frameworks are offered. The project benefited in several ways from use of the Legacy Framework, although refinements to the framework are suggested. The stakeholder process created a context and environment in which team members became receptive to using an ecosystem management approach to evaluate and support management alternatives previously not considered. This allowed for the unanimous agreement to pursue support from upper management and organizational funding to implement a progressive management strategy. The greatly improved stakeholder relations resulted in upper management support for the project.« less
Management of the Israeli National Water System under Uncertainty
NASA Astrophysics Data System (ADS)
Shamir, U.; Housh, M.; Ostfeld, A.; Zaide, M.
2009-12-01
Uncertainty in our region is due to the natural variability of hydrological patterns, with recurring extended droughts, reduced average and broadening variability of recharge that seem to indicate the effect of climate change, as well as to deterioration of water quality in the natural sources, to population growth and distribution, to shifting demand patterns among consumer sectors, and to expected future regional water agreements. These factors combine to create a challenging environment in which highly stressed water resources and water systems have to be developed, operated and managed. The natural sources have been used to their sustainable capacity and often beyond. The main policy responses are a shift of fresh water from agriculture to the cities, replacing it with treated wastewater for irrigation, and a major program for construction of sea-water desalination plants and the associated infrastructure needed for its integration into the supply systems. Organizational reforms, regulation, and demand management options are also being developed, including full-cost pricing. Management of the water resources and systems under these conditions requires a long-term perspective. The methodologies for supporting management decisions that have been used to date by the Israeli Water Authority include evaluation by scenarios, simulation, and optimization with sensitivity analysis. We review existing approaches and models for management of the Israeli water system (Zaide 2006) and then present some new methodologies for addressing operational decisions under hydrological uncertainty, which include generation of tradeoffs between the expected value and variability of the outcomes, and an Info-Gap (Ben-Haim 2006) based approach. These methodologies are demonstrated on examples that emulate portions of a regional water system and are then applied to the Israeli National Water System. Ben-Haim, Y. (2006) Info-Gap Theory: Decisions under Severe Uncertainty, 2nd Ed., Academic Press, London. Zaide, M. (2006) A Model for Management of Water Quantity and Quality in the Israeli National System", MSc Thesis, Faculty of Civil Engineering, Technion. http://urishamir.wri.technion.ac.il/files/documents/Miki%20Zaide%20-%20Thesis%20Final%2015.03.06.pdf
Assessing problem-solving skills in construction education with the virtual construction simulator
NASA Astrophysics Data System (ADS)
Castronovo, Fadi
The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.
ERIC Educational Resources Information Center
Pedersen, Mitra
2013-01-01
This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…
NASA Astrophysics Data System (ADS)
Nadia Dedy, Aimie; Zakuan, Norhayati; Zaleha Omain, Siti; Rahim, Kamaruzzaman Abdul; Ariff, Mohd Shoki Md; Sulaiman, Zuraidah; Zameri Mat Saman, Muhamad
2016-05-01
TQM practices are important to provide customer satisfaction by improved product performance and sustained towards the organizational goal. The objective of this study was to analyse the relationship between TQM practices, process innovation and employee performance. In this study, six critical success factors of TQM have been identified namely customer focus, leadership, training, teamwork, communication, and top management. Based on thorough literature review, employee performances have been measured by two constructs which are job satisfaction and workplace environment. The study used methodology of quantitative approach. The questionnaires for this study were randomly distributed to 102 employees in the selected car manufacturer companies. The respondents were choosing from management team, supervisor, technician and others worker. Results of the study support the proposed hypotheses that there are significant relationship between TQM practices, process innovation and employee performance.
Price, A R G; Jaoui, K; Pearson, M P; Jeudy de Grissac, A
2014-03-15
Rapid environmental assessment (REA) involves scoring abundances of ecosystems/species groups and magnitude of pressures, concurrently, using the same logarithmic (0-6) assessment scale. We demonstrate the utility of REA data for an alert system identifying different levels of coastal management concern. Thresholds set for abundances/magnitudes, when crossed, trigger proposed responses. Kerkennah, Tunisia, our case study, has significant natural assets (e.g. exceptional seagrass and invertebrate abundances), subjected to varying levels of disturbance and management concern. Using REA thresholds set, fishing, green algae/eutrophication and oil occurred at 'low' levels (scores 0-1): management not (currently) necessary. Construction and wood litter prevailed at 'moderate' levels (scores 2-4): management alerted for (further) monitoring. Solid waste densities were 'high' (scores 5-6): management alerted for action; quantities of rubbish were substantial (20-200 items m⁻¹ beach) but not unprecedented. REA is considered a robust methodology and complementary to other rapid assessment techniques, environmental frameworks and indicators of ecosystem condition. Copyright © 2014 Elsevier Ltd. All rights reserved.
78 FR 47677 - DOE Activities and Methodology for Assessing Compliance With Building Energy Codes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... construction. Post- construction evaluations were implemented in one study in an effort to reduce these costs... these pilot studies have led to a number of recommendations and potential changes to the DOE methodology... fundamental assumptions and approaches to measuring compliance with building energy codes. This notice...
Methodology for the Assessment of the Ecotoxicological Potential of Construction Materials
Rodrigues, Patrícia; Silvestre, José D.; Flores-Colen, Inês; Viegas, Cristina A.; de Brito, Jorge; Kurad, Rawaz; Demertzi, Martha
2017-01-01
Innovation in construction materials (CM) implies changing their composition by incorporating raw materials, usually non-traditional ones, which confer the desired characteristics. However, this practice may have unknown risks. This paper discusses the ecotoxicological potential associated with raw and construction materials, and proposes and applies a methodology for the assessment of their ecotoxicological potential. This methodology is based on existing laws, such as Regulation (European Commission) No. 1907/2006 (REACH—Registration, Evaluation, Authorization and Restriction of Chemicals) and Regulation (European Commission) No. 1272/2008 (CLP—Classification, Labelling and Packaging). Its application and validation showed that raw material without clear evidence of ecotoxicological potential, but with some ability to release chemicals, can lead to the formulation of a CM with a slightly lower hazardousness in terms of chemical characterization despite a slightly higher ecotoxicological potential than the raw materials. The proposed methodology can be a useful tool for the development and manufacturing of products and the design choice of the most appropriate CM, aiming at the reduction of their environmental impact and contributing to construction sustainability. PMID:28773011
Methodology for determining the investment attractiveness of construction of high-rise buildings
NASA Astrophysics Data System (ADS)
Nezhnikova, Ekaterina; Kashirin, Valentin; Davydova, Yana; Kazakova, Svetlana
2018-03-01
The article presents the analysis of the existing methods for assessing the investment attractiveness of high-rise construction. The authors determined and justified the primary choice of objects and territories that are the most attractive for the development of high-rise construction. A system of risk indicators has been developed that allow making a quantitative adjustment for a particular project in the evaluation of the efficiency of investment projects. The study is aimed at developing basic methodological concepts for a comparative evaluation of the prospects of construction of high-rise facilities that allow to take into consideration the features of investment in construction and to enable quantitative evaluation of the investment effectiveness in high-rise construction.
Modeling an impact of road geometric design on vehicle energy consumption
NASA Astrophysics Data System (ADS)
Luin, Blaž; Petelin, Stojan; Al-Mansour, Fouad
2017-11-01
Some roads connect traffic origins and destinations directly, some use winding, indirect routes. Indirect connections result in longer distances driven and increased fuel consumption. A similar effect is observed on congested roads and mountain roads with many changes in altitude. Therefore a framework to assess road networks based on energy consumption is proposed. It has been shown that road geometry has significant impact on overall traffic energy consumption and emissions. The methodology presented in the paper analyzes impact of traffic volume, shares of vehicle classes, road network configuration on the energy used by the vehicles. It can be used to optimize energy consumption with efficient traffic management and to choose optimum new road in the design phase. This is especially important as the energy consumed by the vehicles shortly after construction supersedes the energy spent for the road construction.
GenoCAD Plant Grammar to Design Plant Expression Vectors for Promoter Analysis.
Coll, Anna; Wilson, Mandy L; Gruden, Kristina; Peccoud, Jean
2016-01-01
With the rapid advances in prediction tools for discovery of new promoters and their cis-elements, there is a need to improve plant expression methodologies in order to facilitate a high-throughput functional validation of these promoters in planta. The promoter-reporter analysis is an indispensible approach for characterization of plant promoters. It requires the design of complex plant expression vectors, which can be challenging. Here, we describe the use of a plant grammar implemented in GenoCAD that will allow the users to quickly design constructs for promoter analysis experiments but also for other in planta functional studies. The GenoCAD plant grammar includes a library of plant biological parts organized in structural categories to facilitate their use and management and a set of rules that guides the process of assembling these biological parts into large constructs.
Expert assessment of the current state of the energy management system in the company
NASA Astrophysics Data System (ADS)
Minnullina, Anna; Abdrazakov, Rais
2017-10-01
The authors’ expert assessment of the current state of the energy management system in the company is proposed in the article. The experts are invited to assess the status of the energy management system in the following categories: energy policy, organizational structure, training, motivation, control, communication, investment, and energy consumption culture. For the purposes of interpretation of the results of the expert evaluation obtained, a gradation based on a possible range of values is proposed. The expert evaluation allows representing the status of the energy management system in general and at each of its individual levels, which makes it possible to identify the problem areas more accurately. To confirm the applied nature of the proposed methodology, the authors assessed the opinions of 8 experts, employed by the road construction company of the Tyumen Region and related in one way or another to the process of energy consumption in the company due to the nature of their activities.
NASA Technical Reports Server (NTRS)
Jackman, A. E.; Fabos, J. G.; Carlozzi, C. C.
1982-01-01
A management construct is described which forms part of an overall landscape ecological planning model which has as a principal objective the extension of the traditional descriptive land use mapping capabilities of geographic information systems into land management realms. It is noted that geographic information systems appear to be moving to more comprehensive methods of data handling and storage, such as relational and hierarchical data management systems, and a clear need has simultaneously arisen therefore for planning assessment techniques and methodologies which can actually use such complex levels of data in a systematic, yet flexible and scenario dependent way. The descriptive of mapping method proposed broaches such issues and utilizes a current New England bioenergy scenario, stimulated by the use of hardwoods for household heating purposes established in the post oil crisis era and the increased awareness of the possible landscape and ecological ramifications of the continued increasing use of the resource.
Payne, Philip R O; Kwok, Alan; Dhaval, Rakesh; Borlawsky, Tara B
2009-03-01
The conduct of large-scale translational studies presents significant challenges related to the storage, management and analysis of integrative data sets. Ideally, the application of methodologies such as conceptual knowledge discovery in databases (CKDD) provides a means for moving beyond intuitive hypothesis discovery and testing in such data sets, and towards the high-throughput generation and evaluation of knowledge-anchored relationships between complex bio-molecular and phenotypic variables. However, the induction of such high-throughput hypotheses is non-trivial, and requires correspondingly high-throughput validation methodologies. In this manuscript, we describe an evaluation of the efficacy of a natural language processing-based approach to validating such hypotheses. As part of this evaluation, we will examine a phenomenon that we have labeled as "Conceptual Dissonance" in which conceptual knowledge derived from two or more sources of comparable scope and granularity cannot be readily integrated or compared using conventional methods and automated tools.
NASA Technical Reports Server (NTRS)
Chapman, C. P.; Chapman, P. D.; Lewison, A. H.
1982-01-01
A low power photovoltaic system was constructed with approximately 500 amp hours of battery energy storage to provide power to an emergency amateur radio communications center. The system can power the communications center for about 72 hours of continuous nonsun operation. Complete construction details and a design methodology algorithm are given with abundant engineering data and adequate theory to allow similar systems to be constructed, scaled up or down, with minimum design effort.
Groundwater modeling in integrated water resources management--visions for 2020.
Refsgaard, Jens Christian; Højberg, Anker Lajer; Møller, Ingelise; Hansen, Martin; Søndergaard, Verner
2010-01-01
Groundwater modeling is undergoing a change from traditional stand-alone studies toward being an integrated part of holistic water resources management procedures. This is illustrated by the development in Denmark, where comprehensive national databases for geologic borehole data, groundwater-related geophysical data, geologic models, as well as a national groundwater-surface water model have been established and integrated to support water management. This has enhanced the benefits of using groundwater models. Based on insight gained from this Danish experience, a scientifically realistic scenario for the use of groundwater modeling in 2020 has been developed, in which groundwater models will be a part of sophisticated databases and modeling systems. The databases and numerical models will be seamlessly integrated, and the tasks of monitoring and modeling will be merged. Numerical models for atmospheric, surface water, and groundwater processes will be coupled in one integrated modeling system that can operate at a wide range of spatial scales. Furthermore, the management systems will be constructed with a focus on building credibility of model and data use among all stakeholders and on facilitating a learning process whereby data and models, as well as stakeholders' understanding of the system, are updated to currently available information. The key scientific challenges for achieving this are (1) developing new methodologies for integration of statistical and qualitative uncertainty; (2) mapping geological heterogeneity and developing scaling methodologies; (3) developing coupled model codes; and (4) developing integrated information systems, including quality assurance and uncertainty information that facilitate active stakeholder involvement and learning.
Life Cycle Assessment of Wall Systems
NASA Astrophysics Data System (ADS)
Ramachandran, Sriranjani
Natural resource depletion and environmental degradation are the stark realities of the times we live in. As awareness about these issues increases globally, industries and businesses are becoming interested in understanding and minimizing the ecological footprints of their activities. Evaluating the environmental impacts of products and processes has become a key issue, and the first step towards addressing and eventually curbing climate change. Additionally, companies are finding it beneficial and are interested in going beyond compliance using pollution prevention strategies and environmental management systems to improve their environmental performance. Life-cycle Assessment (LCA) is an evaluative method to assess the environmental impacts associated with a products' life-cycle from cradle-to-grave (i.e. from raw material extraction through to material processing, manufacturing, distribution, use, repair and maintenance, and finally, disposal or recycling). This study focuses on evaluating building envelopes on the basis of their life-cycle analysis. In order to facilitate this analysis, a small-scale office building, the University Services Building (USB), with a built-up area of 148,101 ft2 situated on ASU campus in Tempe, Arizona was studied. The building's exterior envelope is the highlight of this study. The current exterior envelope is made of tilt-up concrete construction, a type of construction in which the concrete elements are constructed horizontally and tilted up, after they are cured, using cranes and are braced until other structural elements are secured. This building envelope is compared to five other building envelope systems (i.e. concrete block, insulated concrete form, cast-in-place concrete, steel studs and curtain wall constructions) evaluating them on the basis of least environmental impact. The research methodology involved developing energy models, simulating them and generating changes in energy consumption due to the above mentioned envelope types. Energy consumption data, along with various other details, such as building floor area, areas of walls, columns, beams etc. and their material types were imported into Life-Cycle Assessment software called ATHENA impact estimator for buildings. Using this four-stepped LCA methodology, the results showed that the Steel Stud envelope performed the best and less environmental impact compared to other envelope types. This research methodology can be applied to other building typologies.
Project management practices in engineering university
NASA Astrophysics Data System (ADS)
Sirazitdinova, Y.; Dulzon, A.; Mueller, B.
2015-10-01
The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.
The Construction and Analysis of a Science Story: A Proposed Methodology
ERIC Educational Resources Information Center
Klassen, Stephen
2009-01-01
Science educators are beginning to establish a theoretical and methodological foundation for constructing and using stories in science teaching. At the same time, it is not clear to what degree science stories that have recently been written adhere to the guidelines that are being proposed. The author has written a story about Louis Slotin, which…
Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C
2018-01-01
The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid
2013-02-01
Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.
An Approach for Implementation of Project Management Information Systems
NASA Astrophysics Data System (ADS)
Běrziša, Solvita; Grabis, Jānis
Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.
Observations of fallibility in applications of modern programming methodologies
NASA Technical Reports Server (NTRS)
Gerhart, S. L.; Yelowitz, L.
1976-01-01
Errors, inconsistencies, or confusing points are noted in a variety of published algorithms, many of which are being used as examples in formulating or teaching principles of such modern programming methodologies as formal specification, systematic construction, and correctness proving. Common properties of these points of contention are abstracted. These properties are then used to pinpoint possible causes of the errors and to formulate general guidelines which might help to avoid further errors. The common characteristic of mathematical rigor and reasoning in these examples is noted, leading to some discussion about fallibility in mathematics, and its relationship to fallibility in these programming methodologies. The overriding goal is to cast a more realistic perspective on the methodologies, particularly with respect to older methodologies, such as testing, and to provide constructive recommendations for their improvement.
Burman, Christopher J.; Aphane, Marota; Mtapuri, Oliver; Delobelle, Peter
2015-01-01
Abstract The article describes a design journey that culminated in an HIV-Conversant Community Framework that is now being piloted in the Limpopo Province of South Africa. The objective of the initiative is to reduce the aggregate community viral load by building capacity at multiple scales that strengthens peoples' HIV-related navigational skill sets—while simultaneously opening a ‘chronic situation’ schema. The framework design is based upon a transdisciplinary methodological combination that synthesises ideas and constructs from complexity science and the management sciences as a vehicle through which to re-conceptualise HIV prevention. This resulted in a prototype that included the following constructs: managing HIV-prevention in a complex, adaptive epidemiological landscape; problematising and increasing the scope of the HIV knowledge armamentarium through education that focuses on the viral load and Langerhans cells; disruptive innovation and safe-fail probes followed by the facilitation of path creations and pattern management implementation techniques. These constructs are underpinned by a ‘middle-ground’ prevention approach which is designed to bridge the prevention ‘fault line’, enabling a multi-ontology conceptualisation of the challenge to be developed. The article concludes that stepping outside of the ‘ordered’ epistemological parameters of the existing prevention ‘messaging’ mind-set towards a more systemic approach that emphasises agency, structure and social practices as a contribution to ‘ending AIDS by 2030’ is worthy of further attention if communities are to engage more adaptively with the dynamic HIV landscape in South Africa. PMID:25888256
NASA Astrophysics Data System (ADS)
Pierce, S. A.; Wagner, K.; Schwartz, S.; Gentle, J. N., Jr.
2016-12-01
Critical water resources face the effects of historic drought, increased demand, and potential contamination, the need has never been greater to develop resources to effectively communicate conservation and protection across a broad audience and geographical area. The Watermark application and macro-analysis methodology merges topical analysis of context rich corpus from policy texts with multi-attributed solution sets from integrated models of water resource and other subsystems, such as mineral, food, energy, or environmental systems to construct a scalable, robust, and reproducible approach for identifying links between policy and science knowledge bases. The Watermark application is an open-source, interactive workspace to support science-based visualization and decision making. Designed with generalization in mind, Watermark is a flexible platform that allows for data analysis and inclusion of large datasets with an interactive front-end capable of connecting with other applications as well as advanced computing resources. In addition, the Watermark analysis methodology offers functionality that streamlines communication with non-technical users for policy, education, or engagement with groups around scientific topics of societal relevance. The technology stack for Watermark was selected with the goal of creating a robust and dynamic modular codebase that can be adjusted to fit many use cases and scale to support usage loads that range between simple data display to complex scientific simulation-based modelling and analytics. The methodology uses to topical analysis and simulation-optimization to systematically analyze the policy and management realities of resource systems and explicitly connect the social and problem contexts with science-based and engineering knowledge from models. A case example demonstrates use in a complex groundwater resources management study highlighting multi-criteria spatial decision making and uncertainty comparisons.
Constructability issues on KyTC projects.
DOT National Transportation Integrated Search
2003-07-01
A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...
ERIC Educational Resources Information Center
Anderhag, P.; Wickman, P.-O.; Hamza, K. M.
2015-01-01
In this paper we present a methodological approach for analyzing the transformation of interest in science through classroom talk and action. To this end, we use the construct of "taste for science" as a social and communicative operationalization, or proxy, to the more psychologically oriented construct of interest. To gain a taste for…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-27
... proposed methodological change to reduce the export price or constructed export price in certain non-market... Magnesium, as upheld in the Mag. Corp. cases, with respect to China and Vietnam. Accordingly, pursuant to... the price. In such cases, the Department would adjust the export price or constructed export price...
MacNamara, Annmarie; Phan, K Luan
2016-03-01
NIMH's Research Domain Criteria (RDoC) project seeks to advance the diagnosis, prevention, and treatment of mental disorders by promoting psychobiological research on dimensional constructs that might cut across traditional diagnostic boundaries (Kozak & Cuthbert, ). At the core of this approach is the notion that these dimensional constructs can be assessed across different units of analysis (e.g., genes, physiology, behavior), enriching the constructs and providing more complete explanations of clinical problems. While the conceptual aspects of RDoC have been discussed in several prior papers, its methodological aspects have received comparatively less attention. For example, how to integrate data from different units of analysis has been relatively unclear. Here, we discuss one means of psychobiologically operationalizing RDoC constructs across different units of analysis (the psychoneurometric approach; Yancey et al., ), highlighting ways in which this approach might be refined in future iterations. We conclude that there is much to be learned from this technique; however, greater attention to scale-development methods and to psychometrics will likely benefit this and other methodological approaches to combining measurements across multiple units of analysis. © 2016 Society for Psychophysiological Research.
Life cycle study of different constructive solutions for building enclosures.
Garcia-Ceballos, Luz; de Andres-Díaz, Jose Ramon; Contreras-Lopez, Miguel A
2018-06-01
The construction sector must advance in a more sustainable way and to achieve this goal, the application of global methodologies is needed. These methodologies should take into account all life stages of a building: planning, design, construction, use and demolition. The quantity and variety of the materials used in building construction condition the buildings' environmental and energy impacts. Life Cycle Assessment offers a standardized framework to evaluate the environmental loads of a product, process or activity. This work aims to demonstrate the feasibility of using Life Cycle Assessment (LCA) to select facilities in the construction sector, which minimize environmental and energy impacts. To facilitate the understanding of the proposed methodology, a comparative LCA is performed, to determine the type of thermal insulating material in a double sheet ceramic façade and its thickness, which allows reducing the environmental impacts associated to the enclosure. The three most used enclosure types used in the city of Malaga (Spain) have been selected for this study. The results show the adequacy of the procedure used. Copyright © 2018 Elsevier B.V. All rights reserved.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...
Construct Validity: Advances in Theory and Methodology
Strauss, Milton E.; Smith, Gregory T.
2008-01-01
Measures of psychological constructs are validated by testing whether they relate to measures of other constructs as specified by theory. Each test of relations between measures reflects on the validity of both the measures and the theory driving the test. Construct validation concerns the simultaneous process of measure and theory validation. In this chapter, we review the recent history of validation efforts in clinical psychological science that has led to this perspective, and we review five recent advances in validation theory and methodology of importance for clinical researchers. These are: the emergence of nonjustificationist philosophy of science; an increasing appreciation for theory and the need for informative tests of construct validity; valid construct representation in experimental psychopathology; the need to avoid representing multidimensional constructs with a single score; and the emergence of effective new statistical tools for the evaluation of convergent and discriminant validity. PMID:19086835
NASA Astrophysics Data System (ADS)
Belyaeva, Svetlana; Makeeva, Tatyana; Chugunov, Andrei; Andreeva, Peraskovya
2018-03-01
One of the important conditions of effective renovation of accommodation in region on the base of realization of high-rise construction projects is attraction of investments by forming favorable investment climate, as well as reduction if administrative barriers in construction and update of main funds of housing and communal services. The article proposes methodological bases for assessing the state of the investment climate in the region, as well as the methodology for the formation and evaluation of the investment program of the housing and communal services enterprise. The proposed methodologies are tested on the example of the Voronezh region. Authors also showed the necessity and expediency of using the consulting mechanism in the development of state and non-state investment projects and programs.
Bookbinder, Marilyn; Hugodot, Amandine; Freeman, Katherine; Homel, Peter; Santiago, Elisabeth; Riggs, Alexa; Gavin, Maggie; Chu, Alice; Brady, Ellen; Lesage, Pauline; Portenoy, Russell K
2018-02-01
Quality improvement in end-of-life care generally acquires data from charts or caregivers. "Tracer" methodology, which assesses real-time information from multiple sources, may provide complementary information. The objective of this study was to develop a valid brief audit tool that can guide assessment and rate care when used in a clinician tracer to evaluate the quality of care for the dying patient. To identify items for a brief audit tool, 248 items were created to evaluate overall quality, quality in specific content areas (e.g., symptom management), and specific practices. Collected into three instruments, these items were used to interview professional caregivers and evaluate the charts of hospitalized patients who died. Evidence that this information could be validly captured using a small number of items was obtained through factor analyses, canonical correlations, and group comparisons. A nurse manager field tested tracer methodology using candidate items to evaluate the care provided to other patients who died. The survey of 145 deaths provided chart data and data from 445 interviews (26 physicians, 108 nurses, 18 social workers, and nine chaplains). The analyses yielded evidence of construct validity for a small number of items, demonstrating significant correlations between these items and content areas identified as latent variables in factor analyses. Criterion validity was suggested by significant differences in the ratings on these items between the palliative care unit and other units. The field test evaluated 127 deaths, demonstrated the feasibility of tracer methodology, and informed reworking of the candidate items into the 14-item Tracer EoLC v1. The Tracer EoLC v1 can be used with tracer methodology to guide the assessment and rate the quality of end-of-life care. Copyright © 2017 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The study was intended to provide the Mineral Management Service (MMS) with an analytical tool to evaluate possible economic impacts from Outer Continental Shelf (OCS) development. In particular, the study was designed to provide MMS staff who work on lease sale Energy Impact Statements with an objective technique for estimating the impacts to coastal communities from events that might occur as a result of lease sales: oil spills, onshore construction, and construction of platforms offshore. The project had several specific objectives: (1) provide profiles of 1982 socio-economic conditions in coastal communities, including an analysis of the relative importance of themore » tourist industry in each coastal county; (2) develop a methodology for determining the effects of OCS development on coastal recreation; and recommend mitigation measure that may reduce the negative effect of OCS development on coastal recreation using gravity and economic effects models.« less
Human Factors Simulation in Construction Management Education
ERIC Educational Resources Information Center
Jaeger, M.; Adair, D.
2010-01-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…
A Maritime Phase Zero Force for the Year 2020
2009-06-01
mind, the team constructed maritime forces and then evaluated them against the same scenarios to determine which ones performed better. The...120 1. Project Methodology and Choice of Missions ...............................120 2. Missions and Scenarios construction methodology... projects are designed to build tools that students in the Systems Engineering Analysis curriculum have learned over the 18 month enrollment in the program
Managing In-House Development of a Campus-Wide Information System
ERIC Educational Resources Information Center
Shurville, Simon; Williams, John
2005-01-01
Purpose: To show how a combination of hard and soft project and change management methodologies guided successful in-house development of a campus-wide information system. Design/methodology/approach: A case study of the methodologies and management structures that guided the development is presented. Findings: Applying a combination of the…
Integrating automated support for a software management cycle into the TAME system
NASA Technical Reports Server (NTRS)
Sunazuka, Toshihiko; Basili, Victor R.
1989-01-01
Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.
Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A
2015-01-08
Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation science. Despite numerous constructs having greater than 20 available instruments, which implies saturation, preliminary results suggest that few instruments stem from gold standard development procedures. We anticipate identifying few high-quality, psychometrically sound instruments once our evidence-based assessment rating criteria have been applied. The results of this methodology may enhance the rigor of implementation science evaluations by systematically facilitating access to psychometrically validated instruments and identifying where further instrument development is needed.
Constructing a nurse appraisal form: A Delphi technique study
Zaghloul, Ashraf Ahmad Zaher; AlSokair, May Kosay
2008-01-01
Objective The study was conducted with the aim to construct a unified nurse appraisal format to be used at hospitals performing under different healthcare organizations in the Eastern Province in the Kingdom of Saudi Arabia. Methodology The study included hospitals representing different healthcare organizations within the Eastern Province. The target population included Hospital head nurses and nurse supervisors and the snowball sampling technique was employed to select the panel subjects. Results The final draft resulted into the agreed upon performance dimensions which included namely; quality standards, work habits, supervision/leadership, staff relations and interpersonal skills, attendance and punctuality, problem solving, oral communication, productivity results, coordination, innovation, record keeping. Conclusion Nurse managers have to continuously assess competence of practicing nurses to assure qualified and safe patient care. A nurse appraisal form was constructed concurrently with this study results and was proposed to be used at all Eastern Region hospitals. This study is considered an initial step for further efforts and studies to be conducted to reach both national and international nursing appraisal dimensions and unify them for the sake of best health promotion. PMID:21197327
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
Risk Assessment Methodology for Hazardous Waste Management (1998)
A methodology is described for systematically assessing and comparing the risks to human health and the environment of hazardous waste management alternatives. The methodology selects and links appropriate models and techniques for performing the process.
Cui, De-Mi; Yan, Weizhong; Wang, Xiao-Quan; Lu, Lie-Min
2017-10-25
Low strain pile integrity testing (LSPIT), due to its simplicity and low cost, is one of the most popular NDE methods used in pile foundation construction. While performing LSPIT in the field is generally quite simple and quick, determining the integrity of the test piles by analyzing and interpreting the test signals (reflectograms) is still a manual process performed by experienced experts only. For foundation construction sites where the number of piles to be tested is large, it may take days before the expert can complete interpreting all of the piles and delivering the integrity assessment report. Techniques that can automate test signal interpretation, thus shortening the LSPIT's turnaround time, are of great business value and are in great need. Motivated by this need, in this paper, we develop a computer-aided reflectogram interpretation (CARI) methodology that can interpret a large number of LSPIT signals quickly and consistently. The methodology, built on advanced signal processing and machine learning technologies, can be used to assist the experts in performing both qualitative and quantitative interpretation of LSPIT signals. Specifically, the methodology can ease experts' interpretation burden by screening all test piles quickly and identifying a small number of suspected piles for experts to perform manual, in-depth interpretation. We demonstrate the methodology's effectiveness using the LSPIT signals collected from a number of real-world pile construction sites. The proposed methodology can potentially enhance LSPIT and make it even more efficient and effective in quality control of deep foundation construction.
Towards Knowledge Management for Smart Manufacturing.
Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard
2017-09-01
The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.
NASA Technical Reports Server (NTRS)
Taylor, James C.
2002-01-01
This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.
Gustavson, Daniel E; Miyake, Akira; Hewitt, John K; Friedman, Naomi P
2014-06-01
Previous research has revealed a moderate and positive correlation between procrastination and impulsivity. However, little is known about why these two constructs are related. In the present study, we used behavior-genetics methodology to test three predictions derived from an evolutionary account that postulates that procrastination arose as a by-product of impulsivity: (a) Procrastination is heritable, (b) the two traits share considerable genetic variation, and (c) goal-management ability is an important component of this shared variation. These predictions were confirmed. First, both procrastination and impulsivity were moderately heritable (46% and 49%, respectively). Second, although the two traits were separable at the phenotypic level (r = .65), they were not separable at the genetic level (r genetic = 1.0). Finally, variation in goal-management ability accounted for much of this shared genetic variation. These results suggest that procrastination and impulsivity are linked primarily through genetic influences on the ability to use high-priority goals to effectively regulate actions. © The Author(s) 2014.
Gustavson, Daniel E.; Miyake, Akira; Hewitt, John K.; Friedman, Naomi P.
2014-01-01
Previous research has revealed a moderate positive correlation between procrastination and impulsivity. However, little is known about why these two constructs are related. This study used behavioral genetic methodology to test three predictions derived from an evolutionary account that postulates that procrastination arose as a by-product of impulsivity (Steel, 2010): (a) Procrastination is heritable; (b) the two traits share considerable genetic variation; and (c) goal-management ability is an important component of this shared variation. These predictions were confirmed. First, both procrastination and impulsivity were moderately heritable (46% and 49%, respectively). Second, although the two traits were separable at the phenotypic level (r=.65), they were not separable at the genetic level (rg=1.0). Finally, variation in goal-management ability accounted for much of this shared genetic variation. These results suggest that procrastination and impulsivity are linked primarily through genetic influences on the ability to use their high-priority goals effectively to regulate their action. PMID:24705635
Environmental Effects on Public Health: An Economic Perspective
Remoundou, Kyriaki; Koundouri, Phoebe
2009-01-01
In this article we critically review the economic literature on the effects of environmental changes on public health, in both the developed and the developing world. We first focus on the economic methodologies that are available for the evaluation of the effects (social costs and benefits) of environmental changes (degradation/preservation) on public health. Then, we explain how the monetary valuations of these effects can feed back in the construction of economic policy for creating agent-specific incentives for more efficient public health management, which is also equitable and environmentally sustainable. Our exposition is accompanied by a synthesis of the available quantitative empirical results. PMID:19742153
Environmental effects on public health: an economic perspective.
Remoundou, Kyriaki; Koundouri, Phoebe
2009-08-01
In this article we critically review the economic literature on the effects of environmental changes on public health, in both the developed and the developing world. We first focus on the economic methodologies that are available for the evaluation of the effects (social costs and benefits) of environmental changes (degradation/preservation) on public health. Then, we explain how the monetary evaluations of these effects can feed back in the construction of economic policy for creating agent-specific incentives for more efficient public health management, which is also equitable and environmentally sustainable. Our exposition is accompanied by a synthesis of the available quantitative empirical results.
Abstracting event-based control models for high autonomy systems
NASA Technical Reports Server (NTRS)
Luh, Cheng-Jye; Zeigler, Bernard P.
1993-01-01
A high autonomy system needs many models on which to base control, management, design, and other interventions. These models differ in level of abstraction and in formalism. Concepts and tools are needed to organize the models into a coherent whole. The paper deals with the abstraction processes for systematic derivation of related models for use in event-based control. The multifaceted modeling methodology is briefly reviewed. The morphism concepts needed for application to model abstraction are described. A theory for supporting the construction of DEVS models needed for event-based control is then presented. An implemented morphism on the basis of this theory is also described.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Beckman, Carol S.; Benzinger, Leonora; Beshers, George; Hammerslag, David; Kimball, John; Kirslis, Peter A.; Render, Hal; Richards, Paul; Terwilliger, Robert
1985-01-01
The SAGA system is a software environment that is designed to support most of the software development activities that occur in a software lifecycle. The system can be configured to support specific software development applications using given programming languages, tools, and methodologies. Meta-tools are provided to ease configuration. The SAGA system consists of a small number of software components that are adapted by the meta-tools into specific tools for use in the software development application. The modules are design so that the meta-tools can construct an environment which is both integrated and flexible. The SAGA project is documented in several papers which are presented.
Mechanism of realization economic strategy of transport organization
NASA Astrophysics Data System (ADS)
Palkina, E. S.
2017-10-01
In modern conditions of economic globalization, high dynamism of external environment, economic strategy of transport organization plays an important role in maintaining its competitive advantages, long-term development. For effective achievement of set strategic goals it is necessary to use an adequate mechanism based on completeness and interrelation of its constituent instruments. The main objective of the study presented in this paper is to develop methodological provisions on formation the mechanism of realization economic strategy for transport organizations. The principles of its construction have been proposed, the key components have been defined. Finally, an attempt to implementation this mechanism into the transport organization management system has been realized.
End-to-end observatory software modeling using domain specific languages
NASA Astrophysics Data System (ADS)
Filgueira, José M.; Bec, Matthieu; Liu, Ning; Peng, Chien; Soto, José
2014-07-01
The Giant Magellan Telescope (GMT) is a 25-meter extremely large telescope that is being built by an international consortium of universities and research institutions. Its software and control system is being developed using a set of Domain Specific Languages (DSL) that supports a model driven development methodology integrated with an Agile management process. This approach promotes the use of standardized models that capture the component architecture of the system, that facilitate the construction of technical specifications in a uniform way, that facilitate communication between developers and domain experts and that provide a framework to ensure the successful integration of the software subsystems developed by the GMT partner institutions.
A synoptic view of golf course management
NASA Astrophysics Data System (ADS)
Katula, Robert L.
1996-03-01
The maintenance, construction, and redesign of private, public, and municipal golf courses in the United States is a multi-billion dollar industry. The entire golf course maintenance market, according to the National Golf Foundation, was 6.2 billion per year in 1991. The average maintenance cost in the United States was approximately 40,000 per hole per year for the over 15,000 golf courses in the United States in 1991. Golf course maintenance costs have risen 500 percent from 1971 to 1991. These costs are projected to continue to increase at a rate of 8 percent per year due to the demand for quality playing surfaces, increased use of non-potable water, and taxes on water and chemicals required to maintain turfgrass. The golf course construction and redesign market continues to maintain a rate of over 300 new golf courses and redesigned courses completed each year. The average construction costs run from 4 to 6 million and the average redesign costs 2 to 3 million per course. In order to create a perfectly maintained golf course, golf course managers may use as many as 25 different pesticides, fertilizers, and herbicides to control insects and turf disease. Further, turfgrass is often stressed to its limits when kept at the unnatural heights required to obtain firm and fast greens and fairways. The daily practice of living on the edge is often done with limited knowledge of changes taking place on the golf course, of the location of soil types and fertility, of surface and subsurface drainage, and of previous maintenance practices. There is a growing concern in the golf course industry that the concentration of chemicals and water required to maintain today's golf course may endanger ground water supplies for the surrounding ecosystem. This paper will describe the general methodology PTS used to develop a new management system for the maintenance, construction, and redesign of golf courses. The management system integrates remote sensing technology, geographic information systems analysis, and global positioning satellite survey capabilities to bring a total solution to bear on golf courses.
Human factors simulation in construction management education
NASA Astrophysics Data System (ADS)
Jaeger, M.; Adair, D.
2010-06-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management be taught effectively? Although simulations are applied in construction management education, they have not incorporated human factors sufficiently. The focus on human factors as part of the simulation of construction management situations increases students' learning effectiveness within a cross-cultural teaching setting. This paper shows the development of discrete-event human factors in construction management simulation. A description of the source code is given. Learning effectiveness in a cross-cultural education setting was analysed by evaluating data obtained through student questionnaire surveys. The mean score obtained by the students using the simulator was 32% better than those not exposed to the simulator. The spread of results was noticeably greater for the students not exposed to the simulator. The human factors simulation provides an effective means to teach students the complexities and dynamics of interpersonal relationships in construction management.
Bovea, M D; Powell, J C
2016-04-01
This paper provides a review of the literature that applies the life cycle assessment (LCA) methodology to the assessment of the environmental performance of the life cycle of construction and demolition waste (CDW) management systems. This article is focused on generating a general mapping of the literature and on identifying the best practices in compliance with LCA framework and proposing directions for future LCA studies in this field. The temporal evolution of the research in this field and the aim of the studies have grown in parallel with the legal framework related to waste and energy efficiency of buildings. Most studies have been published in Europe, followed by USA. Asia and Australia, being at an incipient application stage to the rest of the world. Topics related to "LCA of buildings, including their EoL" and "LCA of general CDW management strategies" are the most frequently analysed, followed by "LCA of EoL of construction elements" and "LCA of natural material vs recycled material". Regarding the strategies, recycling off-site and incineration, both combined with landfill for the rejected fractions, are the most commonly applied. Re-use or recycling on-site is the strategy least applied. The key aspect when LCA is applied to evaluate CDW management systems is the need to normalise which processes to include in the system boundary and the functional unit, the use of inventory data adapted to the context of the case study and the definition of a common set of appropriate impact assessment categories. Also, it is important to obtain results disaggregated by unit processes. This will allow the comparison between case studies. Copyright © 2016 Elsevier Ltd. All rights reserved.
Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.
DOT National Transportation Integrated Search
2014-12-01
State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...
43 CFR 11.83 - Damage determination phase-use value methodologies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subject to standards governing its application? (vi) Are methodological inputs and assumptions supported... used for unique or difficult design and estimating conditions. This methodology requires the construction of a simple design for which an estimate can be found and applied to the unique or difficult...
43 CFR 11.83 - Damage determination phase-use value methodologies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subject to standards governing its application? (vi) Are methodological inputs and assumptions supported... used for unique or difficult design and estimating conditions. This methodology requires the construction of a simple design for which an estimate can be found and applied to the unique or difficult...
43 CFR 11.83 - Damage determination phase-use value methodologies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subject to standards governing its application? (vi) Are methodological inputs and assumptions supported... used for unique or difficult design and estimating conditions. This methodology requires the construction of a simple design for which an estimate can be found and applied to the unique or difficult...
43 CFR 11.83 - Damage determination phase-use value methodologies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subject to standards governing its application? (vi) Are methodological inputs and assumptions supported... used for unique or difficult design and estimating conditions. This methodology requires the construction of a simple design for which an estimate can be found and applied to the unique or difficult...
43 CFR 11.83 - Damage determination phase-use value methodologies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subject to standards governing its application? (vi) Are methodological inputs and assumptions supported... used for unique or difficult design and estimating conditions. This methodology requires the construction of a simple design for which an estimate can be found and applied to the unique or difficult...
Personality Assessment of Global Talent: Conceptual and Methodological Issues
ERIC Educational Resources Information Center
van de Vijver, Fons J. R.
2008-01-01
The recruitment of managers who will operate in a culturally heterogeneous context (as expatriate managers, managers in a global company, or managers of a multicultural workforce) is increasingly important in an age of globalization. This article describes conceptual and methodological issues in the assessment of such managers, notably in the…
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
A novel methodology to estimate the evolution of construction waste in construction sites.
Katz, Amnon; Baum, Hadassa
2011-02-01
This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Baird, Aaron; Riggins, Frederick J.
2012-01-01
An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…
Methodology for assessing the effectiveness of access management techniques : executive summary.
DOT National Transportation Integrated Search
1998-09-14
A methodology for assessing the effectiveness of access management techniques on suburban arterial highways is developed. The methodology is described as a seven-step process as follows: (1) establish the purpose of the analysis (2) establish the mea...
48 CFR 915.404-4-71-6 - Fee base.
Code of Federal Regulations, 2014 CFR
2014-10-01
... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...
A Goal Seeking Strategy for Constructing Systems from Alternative Components
NASA Technical Reports Server (NTRS)
Valentine, Mark E.
1999-01-01
This paper describes a methodology to efficiently construct feasible systems then modify feasible systems to meet successive goals by selecting from alternative components, a problem recognized to be n-p complete. The methodology provides a means to catalog and model alternative components. A presented system modeling Structure is robust enough to model a wide variety of systems and provides a means to compare and evaluate alternative systems. These models act as input to a methodology for selecting alternative components to construct feasible systems and modify feasible systems to meet design goals and objectives. The presented algorithm's ability to find a restricted solution, as defined by a unique set of requirements, is demonstrated against an exhaustive search of a sample of proposed shuttle modifications. The utility of the algorithm is demonstrated by comparing results from the algorithm with results from three NASA shuttle evolution studies using their value systems and assumptions.
The Theoretical and Methodological Crisis of the Afrocentric Conception.
ERIC Educational Resources Information Center
Banks, W. Curtis
1992-01-01
Defines the theory of the Afrocentric conception, and comments on Afrocentric research methodology. The Afrocentric conception is likely to succeed if it constructs a particularist theory in contrast to cross-cultural relativism and because it relies on the methodology of the absolute rather than the comparative. (SLD)
NASA Technical Reports Server (NTRS)
Hayes-Roth, Frederick; Erman, Lee D.; Terry, Allan; Hayes-Roth, Barbara
1992-01-01
We have recently begun a 4-year effort to develop a new technology foundation and associated methodology for the rapid development of high-performance intelligent controllers. Our objective in this work is to enable system developers to create effective real-time systems for control of multiple, coordinated entities in much less time than is currently required. Our technical strategy for achieving this objective is like that in other domain-specific software efforts: analyze the domain and task underlying effective performance, construct parametric or model-based generic components and overall solutions to the task, and provide excellent means for specifying, selecting, tailoring or automatically generating the solution elements particularly appropriate for the problem at hand. In this paper, we first present our specific domain focus, briefly describe the methodology and environment we are developing to provide a more regular approach to software development, and then later describe the issues this raises for the research community and this specific workshop.
Monitoring the Impact of Solution Concepts within a Given Problematic
NASA Astrophysics Data System (ADS)
Cavallucci, Denis; Rousselot, François; Zanni, Cecilia
It is acknowledged that one of the most critical issues facing today’s organizations concerns the substantial leaps required to methodologically structure innovation. Among other published work, some suggest that a complete rethinking of current practices is required. In this article, we propose a methodology aiming at providing controlled R&D choices based on a monitoring of the impact Solution Concepts provoke on a problematic situation. Initially this problematic situation is modeled in a graph form, namely a Problem Graph. It has the objective to assists R&D managers when choosing which activities to support and bring them concrete arguments to defend their choices. We postulate that by improving the robustness of such approaches we help deciders to switch from intuitive decisions (mostly built upon their past experiences, fear regarding risks, and awareness of the company’s level of acceptance of novelties) to thoroughly constructed inventive problem solving strategies. Our approach will be discussed using a computer application that illustrates our hypothesis after being tested in several industrial applications.
Object oriented development of engineering software using CLIPS
NASA Technical Reports Server (NTRS)
Yoon, C. John
1991-01-01
Engineering applications involve numeric complexity and manipulations of a large amount of data. Traditionally, numeric computation has been the concern in developing an engineering software. As engineering application software became larger and more complex, management of resources such as data, rather than the numeric complexity, has become the major software design problem. Object oriented design and implementation methodologies can improve the reliability, flexibility, and maintainability of the resulting software; however, some tasks are better solved with the traditional procedural paradigm. The C Language Integrated Production System (CLIPS), with deffunction and defgeneric constructs, supports the procedural paradigm. The natural blending of object oriented and procedural paradigms has been cited as the reason for the popularity of the C++ language. The CLIPS Object Oriented Language's (COOL) object oriented features are more versatile than C++'s. A software design methodology based on object oriented and procedural approaches appropriate for engineering software, and to be implemented in CLIPS was outlined. A method for sensor placement for Space Station Freedom is being implemented in COOL as a sample problem.
Papias, Sandrine; Masson, Matthieu; Pelletant, Sébastien; Prost-Boucle, Stéphanie; Boutin, Catherine
2018-03-01
Constructed wetlands receiving treated wastewater (CWtw) are placed between wastewater treatment plants and receiving water bodies, under the perception that they increase water quality. A better understanding of the CWtw functioning is required to evaluate their real performance. To achieve this, in situ continuous monitoring of nitrate and ammonium concentrations with ion-selective electrodes (ISEs) can provide valuable information. However, this measurement needs precautions to be taken to produce good data quality, especially in areas with high effluent quality requirements. In order to study the functioning of a CWtw instrumented with six ISE probes, we have developed an appropriate methodology for probe management and data processing. It is based on an evaluation of performance in the laboratory and an adapted field protocol for calibration, data treatment and validation. The result is an operating protocol concerning an acceptable cleaning frequency of 2 weeks, a complementary calibration using CWtw water, a drift evaluation and the determination of limits of quantification (1 mgN/L for ammonium and 0.5 mgN/L for nitrate). An example of a 9-month validated dataset confirms that it is fundamental to include the technical limitations of the measuring equipment and set appropriate maintenance and calibration methodologies in order to ensure an accurate interpretation of data.
Wu, Hung-Yi
2012-08-01
This study presents a structural evaluation methodology to link key performance indicators (KPIs) into a strategy map of the balanced scorecard (BSC) for banking institutions. Corresponding with the four BSC perspectives (finance, customer, internal business process, and learning and growth), the most important evaluation indicators of banking performance are synthesized from the relevant literature and screened by a committee of experts. The Decision Making Trial and Evaluation Laboratory (DEMATEL) method, a multiple criteria analysis tool, is then employed to determine the causal relationships between the KPIs, to identify the critical central and influential factors, and to establish a visualized strategy map with logical links to improve banking performance. An empirical application is provided as an example. According to the expert evaluations, the three most essential KPIs for banking performance are customer satisfaction, sales performance, and customer retention rate. The DEMATEL results demonstrate a clear road map to assist management in prioritizing the performance indicators and in focusing attention on the strategy-related activities of the crucial indicators. According to the constructed strategy map, management could better invest limited resources in the areas that need improvement most. Although these strategy maps of the BSC are not universal, the research results show that the presented approach is an objective and feasible way to construct strategy maps more justifiably. The proposed framework can be applicable to institutions in other industries as well. Copyright © 2011 Elsevier Ltd. All rights reserved.
Risk analysis within environmental impact assessment of proposed construction activity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeleňáková, Martina; Zvijáková, Lenka
Environmental impact assessment is an important process, prior to approval of the investment plan, providing a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to develop a specific methodology for the analysis and evaluation of environmental impacts of selected constructions – flood protection structures using risk analysis methods. The application of methodology designed for the process of environmental impact assessment will develop assumptions for further improvements or more effective implementation and performance of this process. The main objective of the paper is to improve the implementation ofmore » the environmental impact assessment process. Through the use of risk analysis methods in environmental impact assessment process, the set objective has been achieved. - Highlights: This paper is informed by an effort to develop research with the aim of: • Improving existing qualitative and quantitative methods for assessing the impacts • A better understanding of relations between probabilities and consequences • Methodology for the EIA of flood protection constructions based on risk analysis • Creative approaches in the search for environmentally friendly proposed activities.« less
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2014 CFR
2014-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2011 CFR
2011-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2013 CFR
2013-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2012 CFR
2012-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
A multi-agent system for monitoring patient flow.
Rosati, Samanta; Tralli, Augusta; Balestra, Gabriella
2013-01-01
Patient flow within a healthcare facility may follow different and, sometimes, complicated paths. Each path phase is associated with the documentation of the activities carried out during it and may require the consultation of clinical guidelines, medical literature and the use of specific software and decision aid systems. In this study we present the design of a Patient Flow Management System (PFMS) based on Multi Agent Systems (MAS) methodology. System requirements were identified by means of process modeling tools and a MAS consisting of six agents was designed and is under construction. Its main goal is to support both the medical staff during the health care process and the hospital managers in assuring that all the required documentation is completed and available. Moreover, such a tool can be used for the assessment and comparison of different clinical pathways, in order to identify possible improvementsand the optimum patient flow.
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
He, Guizhen; Zhang, Lei; Lu, Yonglong
2009-09-01
Large-scale public infrastructure projects have featured in China's modernization course since the early 1980s. During the early stages of China's rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai-Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway's construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.
DOT National Transportation Integrated Search
1998-09-14
A methodology for assessing the effectiveness of access management techniques on suburban arterial highways is developed. The methodology is described as a seven-step process as follows: (1) establish the purpose of the analysis (2) establish the mea...
How Can Lean Construction Improve the Daily Schedule of A Construction Manager?
NASA Astrophysics Data System (ADS)
Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin
2017-10-01
The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.
ERIC Educational Resources Information Center
Healey, Nigel Martin
2018-01-01
Purpose: The purpose of this paper is to investigate the challenges of managing transnational education (TNE) partnerships from the perspective of the home university managers. Design/methodology/approach: The study adopts a qualitative, "insider researcher" methodology. It uses a sample set of eight mangers who operate from the home…
AERIS: An Integrated Domain Information System for Aerospace Science and Technology
ERIC Educational Resources Information Center
Hatua, Sudip Ranjan; Madalli, Devika P.
2011-01-01
Purpose: The purpose of this paper is to discuss the methodology in building an integrated domain information system with illustrations that provide proof of concept. Design/methodology/approach: The present work studies the usual search engine approach to information and its pitfalls. A methodology was adopted for construction of a domain-based…
An Agile Constructionist Mentoring Methodology for Software Projects in the High School
ERIC Educational Resources Information Center
Meerbaum-Salant, Orni; Hazzan, Orit
2010-01-01
This article describes the construction process and evaluation of the Agile Constructionist Mentoring Methodology (ACMM), a mentoring method for guiding software development projects in the high school. The need for such a methodology has arisen due to the complexity of mentoring software project development in the high school. We introduce the…
NASA Astrophysics Data System (ADS)
Ng, L. S.; Tan, L. W.; Seow, T. W.
2017-11-01
The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.
Construction Manager or General Contractor?
ERIC Educational Resources Information Center
McKinley, John
1991-01-01
Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)
Instruments Measuring Integrated Care: A Systematic Review of Measurement Properties.
Bautista, Mary Ann C; Nurjono, Milawaty; Lim, Yee Wei; Dessers, Ezra; Vrijhoef, Hubertus Jm
2016-12-01
Policy Points: Investigations on systematic methodologies for measuring integrated care should coincide with the growing interest in this field of research. A systematic review of instruments provides insights into integrated care measurement, including setting the research agenda for validating available instruments and informing the decision to develop new ones. This study is the first systematic review of instruments measuring integrated care with an evidence synthesis of the measurement properties. We found 209 index instruments measuring different constructs related to integrated care; the strength of evidence on the adequacy of the majority of their measurement properties remained largely unassessed. Integrated care is an important strategy for increasing health system performance. Despite its growing significance, detailed evidence on the measurement properties of integrated care instruments remains vague and limited. Our systematic review aims to provide evidence on the state of the art in measuring integrated care. Our comprehensive systematic review framework builds on the Rainbow Model for Integrated Care (RMIC). We searched MEDLINE/PubMed for published articles on the measurement properties of instruments measuring integrated care and identified eligible articles using a standard set of selection criteria. We assessed the methodological quality of every validation study reported using the COSMIN checklist and extracted data on study and instrument characteristics. We also evaluated the measurement properties of each examined instrument per validation study and provided a best evidence synthesis on the adequacy of measurement properties of the index instruments. From the 300 eligible articles, we assessed the methodological quality of 379 validation studies from which we identified 209 index instruments measuring integrated care constructs. The majority of studies reported on instruments measuring constructs related to care integration (33%) and patient-centered care (49%); fewer studies measured care continuity/comprehensive care (15%) and care coordination/case management (3%). We mapped 84% of the measured constructs to the clinical integration domain of the RMIC, with fewer constructs related to the domains of professional (3.7%), organizational (3.4%), and functional (0.5%) integration. Only 8% of the instruments were mapped to a combination of domains; none were mapped exclusively to the system or normative integration domains. The majority of instruments were administered to either patients (60%) or health care providers (20%). Of the measurement properties, responsiveness (4%), measurement error (7%), and criterion (12%) and cross-cultural validity (14%) were less commonly reported. We found <50% of the validation studies to be of good or excellent quality for any of the measurement properties. Only a minority of index instruments showed strong evidence of positive findings for internal consistency (15%), content validity (19%), and structural validity (7%); with moderate evidence of positive findings for internal consistency (14%) and construct validity (14%). Our results suggest that the quality of measurement properties of instruments measuring integrated care is in need of improvement with the less-studied constructs and domains to become part of newly developed instruments. © 2016 Milbank Memorial Fund.
Instruments Measuring Integrated Care: A Systematic Review of Measurement Properties
BAUTISTA, MARY ANN C.; NURJONO, MILAWATY; DESSERS, EZRA; VRIJHOEF, HUBERTUS JM
2016-01-01
Policy Points: Investigations on systematic methodologies for measuring integrated care should coincide with the growing interest in this field of research.A systematic review of instruments provides insights into integrated care measurement, including setting the research agenda for validating available instruments and informing the decision to develop new ones.This study is the first systematic review of instruments measuring integrated care with an evidence synthesis of the measurement properties.We found 209 index instruments measuring different constructs related to integrated care; the strength of evidence on the adequacy of the majority of their measurement properties remained largely unassessed. Context Integrated care is an important strategy for increasing health system performance. Despite its growing significance, detailed evidence on the measurement properties of integrated care instruments remains vague and limited. Our systematic review aims to provide evidence on the state of the art in measuring integrated care. Methods Our comprehensive systematic review framework builds on the Rainbow Model for Integrated Care (RMIC). We searched MEDLINE/PubMed for published articles on the measurement properties of instruments measuring integrated care and identified eligible articles using a standard set of selection criteria. We assessed the methodological quality of every validation study reported using the COSMIN checklist and extracted data on study and instrument characteristics. We also evaluated the measurement properties of each examined instrument per validation study and provided a best evidence synthesis on the adequacy of measurement properties of the index instruments. Findings From the 300 eligible articles, we assessed the methodological quality of 379 validation studies from which we identified 209 index instruments measuring integrated care constructs. The majority of studies reported on instruments measuring constructs related to care integration (33%) and patient‐centered care (49%); fewer studies measured care continuity/comprehensive care (15%) and care coordination/case management (3%). We mapped 84% of the measured constructs to the clinical integration domain of the RMIC, with fewer constructs related to the domains of professional (3.7%), organizational (3.4%), and functional (0.5%) integration. Only 8% of the instruments were mapped to a combination of domains; none were mapped exclusively to the system or normative integration domains. The majority of instruments were administered to either patients (60%) or health care providers (20%). Of the measurement properties, responsiveness (4%), measurement error (7%), and criterion (12%) and cross‐cultural validity (14%) were less commonly reported. We found <50% of the validation studies to be of good or excellent quality for any of the measurement properties. Only a minority of index instruments showed strong evidence of positive findings for internal consistency (15%), content validity (19%), and structural validity (7%); with moderate evidence of positive findings for internal consistency (14%) and construct validity (14%). Conclusions Our results suggest that the quality of measurement properties of instruments measuring integrated care is in need of improvement with the less‐studied constructs and domains to become part of newly developed instruments. PMID:27995711
D'Onza, Giuseppe; Greco, Giulio; Allegrini, Marco
2016-02-01
Recycling implies additional costs for separated municipal solid waste (MSW) collection. The aim of the present study is to propose and implement a management tool - the full cost accounting (FCA) method - to calculate the full collection costs of different types of waste. Our analysis aims for a better understanding of the difficulties of putting FCA into practice in the MSW sector. We propose a FCA methodology that uses standard cost and actual quantities to calculate the collection costs of separate and undifferentiated waste. Our methodology allows cost efficiency analysis and benchmarking, overcoming problems related to firm-specific accounting choices, earnings management policies and purchase policies. Our methodology allows benchmarking and variance analysis that can be used to identify the causes of off-standards performance and guide managers to deploy resources more efficiently. Our methodology can be implemented by companies lacking a sophisticated management accounting system. Copyright © 2015 Elsevier Ltd. All rights reserved.
Construction Management Meets Today's Realities.
ERIC Educational Resources Information Center
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
Le management des projets scientifiques
NASA Astrophysics Data System (ADS)
Perrier, Françoise
2000-12-01
We describe in this paper a new approach for the management of scientific projects. This approach is the result of a long reflexion carried out within the MQDP (Methodology and Quality in the Project Development) group of INSU-CNRS, and continued with Guy Serra. Our reflexion was initiated with the study of the so-called `North-American Paradigm' which was, initially considered as the only relevant management model. Through our active participation in several astrophysical projects we realized that this model could not be applied to our laboratories without major modifications. Therefore, step-by-step, we have constructed our own methodology, using to the fullest human potential resources existing in our research field, their habits and skills. We have also participated in various working groups in industrial and scientific organisms for the benefits of CNRS. The management model presented here is based on a systemic and complex approach. This approach lets us describe the multiple aspects of a scientific project specially taking into account the human dimension. The project system model includes three major interconnected systems, immersed within an influencing and influenced environment: the `System to be Realized' which defines scientific and technical tasks leading to the scientific goals, the `Realizing System' which describes procedures, processes and organization, and the `Actors' System' which implements and boosts all the processes. Each one exists only through a series of successive models, elaborated at predefined dates of the project called `key-points'. These systems evolve with time and under often-unpredictable circumstances and the models have to take it into account. At these key-points, each model is compared to reality and the difference between the predicted and realized tasks is evaluated in order to define the data for the next model. This model can be applied to any kind of projects.
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2014 CFR
2014-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2012 CFR
2012-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2013 CFR
2013-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
48 CFR 915.404-4-71-1 - General.
Code of Federal Regulations, 2011 CFR
2011-10-01
... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...
Code of Federal Regulations, 2011 CFR
2011-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Code of Federal Regulations, 2013 CFR
2013-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Code of Federal Regulations, 2012 CFR
2012-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Code of Federal Regulations, 2014 CFR
2014-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Code of Federal Regulations, 2010 CFR
2010-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Solid Waste Management Planning--A Methodology
ERIC Educational Resources Information Center
Theisen, Hilary M.; And Others
1975-01-01
This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)
A methodology to assess performance of human-robotic systems in achievement of collective tasks
NASA Technical Reports Server (NTRS)
Howard, Ayanna M.
2005-01-01
In this paper, we present a methodology to assess system performance of human-robotic systems in achievement of collective tasks such as habitat construction, geological sampling, and space exploration.
Bergamaschi, Brian A.; Bernknopf, Richard; Clow, David; Dye, Dennis; Faulkner, Stephen; Forney, William; Gleason, Robert; Hawbaker, Todd; Liu, Jinxun; Liu, Shu-Guang; Prisley, Stephen; Reed, Bradley; Reeves, Matthew; Rollins, Matthew; Sleeter, Benjamin; Sohl, Terry; Stackpoole, Sarah; Stehman, Stephen; Striegl, Robert G.; Wein, Anne; Zhu, Zhi-Liang; Zhu, Zhi-Liang
2010-01-01
The Energy Independence and Security Act of 2007 (EISA), Section 712, authorizes the U.S. Department of the Interior to develop a methodology and conduct an assessment of the Nation's ecosystems focusing on carbon stocks, carbon sequestration, and emissions of three greenhouse gases (GHGs): carbon dioxide, methane, and nitrous oxide. The major requirements include (1) an assessment of all ecosystems (terrestrial systems, such as forests, croplands, wetlands, shrub and grasslands; and aquatic ecosystems, such as rivers, lakes, and estuaries), (2) an estimation of annual potential capacities of ecosystems to increase carbon sequestration and reduce net GHG emissions in the context of mitigation strategies (including management and restoration activities), and (3) an evaluation of the effects of controlling processes, such as climate change, land use and land cover, and wildlfires. The purpose of this draft methodology for public review is to propose a technical plan to conduct the assessment. Within the methodology, the concepts of ecosystems, carbon pools, and GHG fluxes used for the assessment follow conventional definitions in use by major national and international assessment or inventory efforts. In order to estimate current ecosystem carbon stocks and GHG fluxes and to understand the potential capacity and effects of mitigation strategies, the method will use two time periods for the assessment: 2001 through 2010, which establishes a current ecosystem GHG baseline and will be used to validate the models; and 2011 through 2050, which will be used to assess future potential conditions based on a set of projected scenarios. The scenario framework is constructed using storylines of the Intergovernmental Panel on Climate Change (IPCC) Special Report Emission Scenarios (SRES), along with initial reference land-use and land-cover (LULC) and land-management scenarios. An additional three LULC and land-management mitigation scenarios will be constructed for each storyline to enhance carbon sequestration and reduce GHG fluxes in ecosystems. Input from regional experts and stakeholders will be solicited to construct realistic and meaningful scenarios. The methods for mapping the current LULC and ecosystem disturbances will require the extensive use of both remote-sensing data and in-situ (for example, forest inventory data) to capture and characterize landscape-change events. For future potential LULC and ecosystem disturbances, key drivers such as socioeconomic, policy, and climate assumptions will be used in addition to biophysical data. The product of these analyses will be a series of maps for each future year for each scenario. These annual maps will form the basis for estimating carbon storage and GHG emissions. For terrestrial ecosystems, carbon storage, carbon-sequestration capacities, and GHG emissions under the current and projected future conditions will be assessed using the LULC and ecosystem-disturbance estimates in map format with a spatially explicit biogeochemical ensemble modeling system that incorporates properties of management activities (such as tillage or harvesting) and properties of individual ecosystems (such as elevation, vegetation characteristics, and soil attributes). For aquatic ecosystems, carbon burial in sediments and GHG fluxes are functions of the current and projected future stream flow and sediment transports, and therefore will be assessed using empirical modeling methods. Validation and uncertainty analysis methods described in the methodology will follow established guidelines to assess the quality of the assessment results. The U.S. Environmental Protection Agency's Level II ecoregions map (which delineates 24 ecoregions for the Nation) will be the practical instrument for developing and delivering assessment results. Consequently, the ecoregion will be the reporting unit of the assessment because the mitigation scenarios, assessment results, validation, and uncertainty analysis will be
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana
2014-11-01
Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.
Shifting Selves: Constructing and Negotiating Academic Identities
ERIC Educational Resources Information Center
Vandeyar, S.
2010-01-01
This study set out to explore how academics construct and negotiate their identities within the world of the academe. Identity construction involves different forms of community participation and identification. Utilising the research methodology of narrative inquiry, this article explores how academics came to see themselves across those…
A system management methodology for building successful resource management systems
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller; Willoughby, John K.
1989-01-01
This paper presents a system management methodology for building successful resource management systems that possess lifecycle effectiveness. This methodology is based on an analysis of the traditional practice of Systems Engineering Management as it applies to the development of resource management systems. The analysis produced fifteen significant findings presented as recommended adaptations to the traditional practice of Systems Engineering Management to accommodate system development when the requirements are incomplete, unquantifiable, ambiguous and dynamic. Ten recommended adaptations to achieve operational effectiveness when requirements are incomplete, unquantifiable or ambiguous are presented and discussed. Five recommended adaptations to achieve system extensibility when requirements are dynamic are also presented and discussed. The authors conclude that the recommended adaptations to the traditional practice of Systems Engineering Management should be implemented for future resource management systems and that the technology exists to build these systems extensibly.
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
NASA Astrophysics Data System (ADS)
Ren, Lei; Zhang, Lin; Tao, Fei; (Luke) Zhang, Xiaolong; Luo, Yongliang; Zhang, Yabin
2012-08-01
Multidisciplinary design of complex products leads to an increasing demand for high performance simulation (HPS) platforms. One great challenge is how to achieve high efficient utilisation of large-scale simulation resources in distributed and heterogeneous environments. This article reports a virtualisation-based methodology to realise a HPS platform. This research is driven by the issues concerning large-scale simulation resources deployment and complex simulation environment construction, efficient and transparent utilisation of fine-grained simulation resources and high reliable simulation with fault tolerance. A framework of virtualisation-based simulation platform (VSIM) is first proposed. Then the article investigates and discusses key approaches in VSIM, including simulation resources modelling, a method to automatically deploying simulation resources for dynamic construction of system environment, and a live migration mechanism in case of faults in run-time simulation. Furthermore, the proposed methodology is applied to a multidisciplinary design system for aircraft virtual prototyping and some experiments are conducted. The experimental results show that the proposed methodology can (1) significantly improve the utilisation of fine-grained simulation resources, (2) result in a great reduction in deployment time and an increased flexibility for simulation environment construction and (3)achieve fault tolerant simulation.
Manowong, Ektewan
2012-01-01
Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.
The effect of Problem/Project-Based Learning on a desired skill set for construction professionals
NASA Astrophysics Data System (ADS)
Sirotiak, Todd L.
The purpose of this study was to investigate if a Problem/Project-Based Learning (PBL) approach can affect certain non-technical, "soft" skills of construction engineers. Such skills include leadership, adaptability, and stress management. In mixed design research, quantitative and qualitative data are assembled and analyzed collectively. For this study, two separate assessment tools were used for the quantitative portion, while open-ended written reflections and a partially closed-ended senior questionnaire were implemented for the qualitative portion. A hypothetical model was used to investigate certain soft skills based on prior research documenting need. Skills investigated were confidence, stress coping, leadership, communication skills, adaptability, and management skills. Descriptive statistics, open-ended final written reflections, and a partially closed-ended senior questionnaire were used to analyze the data. PBL is a process in which the students are challenged to develop realistic solutions on open, less structured, real world type problems. The results of this study performed with the combined count of nearly 60 students suggest that PBL can influence several soft skills of senior construction engineers. Specifically, these findings demonstrate the following: (a) PBL appears to affect students' soft skills; (b) students appear to recognize the realism and "real world" applicability that PBL brings to their skill development; and (c) the data suggest that the experience is holistic and offers opportunities for balanced growth in several ways. Some key competencies such as communication and leadership indicated significant enhancements. Although this study was limited to one academic year of the university's construction engineering program, it provides interesting insight to changes within the time period investigated. This study should be replicated in other construction engineering environments to investigate a larger population sample. In addition, industry, professional consultants, and academic entities are encouraged to review current learning methods to ensure that they are implementing the findings and methodology offered in this study.
Diagnosis Related Groups as a Casemix/Management Tool for Hospice Patients
Johnson-Hürzeler, R.; Leary, Robert J.; Hill, Claire L.
1983-01-01
to control the costs of care, and to remain prepared for changes in reimbursement methodologies, health care organizations are beginning to analyze their casemix and their costs per case of providing care. Increasing importance is thus assigned to the search for valid casemix measures and to the construction of information systems which will support casemix investigations. After two years of information systems development, The Connecticut Hospice has begun its search for casemix measures that are applicable to the care of the dying. In this paper, we present our findings on the application of one casemix measure - the DRG - in the specialized area of nonsurgical care of the terminally ill.
A rule-based expert system applied to moisture durability of building envelopes
Boudreaux, Philip R.; Pallin, Simon B.; Accawi, Gina K.; ...
2018-01-09
The moisture durability of an envelope component such as a wall or roof is difficult to predict. Moisture durability depends on all the construction materials used, as well as the climate, orientation, air tightness, and indoor conditions. Modern building codes require more insulation and tighter construction but provide little guidance about how to ensure these energy-efficient assemblies remain moisture durable. Furthermore, as new products and materials are introduced, builders are increasingly uncertain about the long-term durability of their building envelope designs. Oak Ridge National Laboratory and the US Department of Energy’s Building America Program are applying a rule-based expert systemmore » methodology in a web tool to help designers determine whether a given wall design is likely to be moisture durable and provide expert guidance on moisture risk management specific to a wall design and climate. Finally, the expert system is populated with knowledge from both expert judgment and probabilistic hygrothermal simulation results.« less
Bratsas, Charalampos; Koutkias, Vassilis; Kaimakamis, Evangelos; Bamidis, Panagiotis; Maglaveras, Nicos
2007-01-01
Medical Computational Problem (MCP) solving is related to medical problems and their computerized algorithmic solutions. In this paper, an extension of an ontology-based model to fuzzy logic is presented, as a means to enhance the information retrieval (IR) procedure in semantic management of MCPs. We present herein the methodology followed for the fuzzy expansion of the ontology model, the fuzzy query expansion procedure, as well as an appropriate ontology-based Vector Space Model (VSM) that was constructed for efficient mapping of user-defined MCP search criteria and MCP acquired knowledge. The relevant fuzzy thesaurus is constructed by calculating the simultaneous occurrences of terms and the term-to-term similarities derived from the ontology that utilizes UMLS (Unified Medical Language System) concepts by using Concept Unique Identifiers (CUI), synonyms, semantic types, and broader-narrower relationships for fuzzy query expansion. The current approach constitutes a sophisticated advance for effective, semantics-based MCP-related IR.
Component-based integration of chemistry and optimization software.
Kenny, Joseph P; Benson, Steven J; Alexeev, Yuri; Sarich, Jason; Janssen, Curtis L; McInnes, Lois Curfman; Krishnan, Manojkumar; Nieplocha, Jarek; Jurrus, Elizabeth; Fahlstrom, Carl; Windus, Theresa L
2004-11-15
Typical scientific software designs make rigid assumptions regarding programming language and data structures, frustrating software interoperability and scientific collaboration. Component-based software engineering is an emerging approach to managing the increasing complexity of scientific software. Component technology facilitates code interoperability and reuse. Through the adoption of methodology and tools developed by the Common Component Architecture Forum, we have developed a component architecture for molecular structure optimization. Using the NWChem and Massively Parallel Quantum Chemistry packages, we have produced chemistry components that provide capacity for energy and energy derivative evaluation. We have constructed geometry optimization applications by integrating the Toolkit for Advanced Optimization, Portable Extensible Toolkit for Scientific Computation, and Global Arrays packages, which provide optimization and linear algebra capabilities. We present a brief overview of the component development process and a description of abstract interfaces for chemical optimizations. The components conforming to these abstract interfaces allow the construction of applications using different chemistry and mathematics packages interchangeably. Initial numerical results for the component software demonstrate good performance, and highlight potential research enabled by this platform.
A rule-based expert system applied to moisture durability of building envelopes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boudreaux, Philip R.; Pallin, Simon B.; Accawi, Gina K.
The moisture durability of an envelope component such as a wall or roof is difficult to predict. Moisture durability depends on all the construction materials used, as well as the climate, orientation, air tightness, and indoor conditions. Modern building codes require more insulation and tighter construction but provide little guidance about how to ensure these energy-efficient assemblies remain moisture durable. Furthermore, as new products and materials are introduced, builders are increasingly uncertain about the long-term durability of their building envelope designs. Oak Ridge National Laboratory and the US Department of Energy’s Building America Program are applying a rule-based expert systemmore » methodology in a web tool to help designers determine whether a given wall design is likely to be moisture durable and provide expert guidance on moisture risk management specific to a wall design and climate. Finally, the expert system is populated with knowledge from both expert judgment and probabilistic hygrothermal simulation results.« less
Park, Hyun Sook; Jung, Sun Young
2013-12-01
This study was done to provide fundamental data for the development of competency reinforcement programs to prevent addictive behavior in adolescents through the construction and examination of an addiction prevention core competency model. In this study core competencies for preventing addictive behavior in adolescents through competency modeling were identified, and the addiction prevention core competency model was developed. It was validated methodologically. Competencies for preventing addictive behavior in adolescents as defined by the addiction prevention core competency model are as follows: positive self-worth, self-control skill, time management skill, reality perception skill, risk coping skill, and positive communication with parents and with peers or social group. After construction, concurrent cross validation of the addiction prevention core competency model showed that this model was appropriate. The study results indicate that the addiction prevention core competency model for the prevention of addictive behavior in adolescents through competency modeling can be used as a foundation for an integral approach to enhance adolescent is used as an adjective and prevent addictive behavior. This approach can be a school-centered, cost-efficient strategy which not only reduces addictive behavior in adolescents, but also improves the quality of their resources.
Trajectory of Sewerage System Development Optimization
NASA Astrophysics Data System (ADS)
Chupin, R. V.; Mayzel, I. V.; Chupin, V. R.
2017-11-01
The transition to market relations has determined a new technology for our country to manage the development of urban engineering systems. This technology has shifted to the municipal level and it can, in large, be presented in two stages. The first is the development of a scheme for the development of the water supply and sanitation system, the second is the implementation of this scheme on the basis of investment programs of utilities. In the investment programs, financial support is provided for the development and reconstruction of water disposal systems due to the investment component in the tariff, connection fees for newly commissioned capital construction projects and targeted financing for selected state and municipal programs, loans and credits. Financial provision with the development of sewerage systems becomes limited and the problem arises in their rational distribution between the construction of new water disposal facilities and the reconstruction of existing ones. The paper suggests a methodology for developing options for the development of sewerage systems, selecting the best of them by the life cycle cost criterion, taking into account the limited investments in their construction, models and methods of analysis, optimizing their reconstruction and development, taking into account reliability and seismic resistance.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2013 CFR
2013-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2014 CFR
2014-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Interpersonal Conflict Management
ERIC Educational Resources Information Center
Roark, Albert E.
1978-01-01
The difference between constructive and destructive conflicts may be traced to the way in which they are managed. Third-party help is often utilized to achieve constructive conflict management. This article describes two models for conflict management consultation. Five guidelines are given for constructive conflict management. (Author/JEL)
Homeland Security Collaboration: Catch Phrase or Preeminent Organizational Construct?
2009-09-01
collaborative effort? C. RESEARCH METHODOLOGY This research project utilized a modified case study methodology. The traditional case study method ...discussing the research method , offering smart practices and culminate with findings and recommendations. Chapter II Homeland Security Collaboration...41 Centers for Regional Excellence, “Building Models.” 16 Chapter III Research Methodology: Modified Case Study Method is
We tested two methods for dataset generation and model construction, and three tree-classifier variants to identify the most parsimonious and thematically accurate mapping methodology for the SW ReGAP project. Competing methodologies were tested in the East Great Basin mapping un...
Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli
2004-01-01
Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.
2016-09-01
NSDA Nigerian Steel Development Authority OPC ordinary Portland cement PDF population density factor RCC Reynolds Construction Company RHA rice...construction. Byproducts include blast furnace slag cement and gas. The increased use of steel scrap in production creates less dependence on the raw...The construction resources are gravel, cement , ready-mix concrete, lumber, steel , and brick. In some cases, there are multiple central areas in a
USTC & TBA Guidelines for Tennis Court & Running Track Construction.
ERIC Educational Resources Information Center
United States Tennis Court & Track Builders Association.
Guidelines are presented on tennis court and track and field construction that reflect the latest developments in construction technology, methodology, and practice. Based on contributions from experienced certified tennis court and track builders, material suppliers and design professionals, this manual examines each of the critical areas of…
Knowledge Creation in Construction Organisations: A Case Approach
ERIC Educational Resources Information Center
Eliufoo, Harriet
2008-01-01
Purpose: The purpose of this paper is to investigate and characterise the knowledge creation process in construction organisations and explore to what extent organisations facilitate the process. Design/methodology/approach: A case study approach is adopted using four construction organisations; a knowledge creation model is also used as the…
Comparison of Navy and Private-Sector Construction Costs
1997-09-01
contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar
Construction of hexahedral finite element mesh capturing realistic geometries of a petroleum reserve
Park, Byoung Yoon; Roberts, Barry L.; Sobolik, Steven R.
2017-07-27
The three-dimensional finite element mesh capturing realistic geometries of the Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh consists of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time while maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for various civil and geological structures.« less
Construction of hexahedral finite element mesh capturing realistic geometries of a petroleum reserve
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Byoung Yoon; Roberts, Barry L.; Sobolik, Steven R.
The three-dimensional finite element mesh capturing realistic geometries of the Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh consists of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time while maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for various civil and geological structures.« less
García Palacios, Mariana; Shabel, Paula; Horn, Axel; Castorina, José Antonio
2018-06-01
Though context has yet to receive an unequivocal definition, it is a concept that frequently appears in research in children's knowledge and its construction. This article examines the scope and meaning of context in genetic psychology and social anthropology in order to better understand the relationship between children's construction of knowledge and the context in which it occurs. Meta-theoretical, theoretical and methodological complexities arise when the concept is analyzed in the two disciplines, and these will also be addressed herein. The fields of anthropology and constructive psychology are both affected by the relationship between the building of knowledge and the social practices surrounding this process. Finally, based on these empirical examinations, the article explores how research methodologies could incorporate the notion of context in research focused on the construction of knowledge.
Legitimation dynamics: How SROI could mobilize resources for new constituencies.
Cooney, Kate
2017-10-01
The following critical essay on the social return on investment (SROI) methodology is broken into two parts. In the first section, focusing on the categorization dynamics of the SROI, I review a set of methodological and ethical tensions surrounding the SROI, using examples from my own work and other published works using SROI. These tensions include the fact that the project requires standardization to achieve comparability while concurrently offering a flexibility in constructing a narrative of impact that is attractive to users. In the second section, focusing on the legitimation dynamics, I define a narrow scope for where, despite the aforementioned pitfalls, that the SROI can be quite effective in building a rhetorical argument for directing material resources. The essay argues that despite ongoing methodological challenges, the investor lens and market logic undergirding the metric provide a powerful frame for persuasion that can be used to construct worthiness and value creation for constituents not already constructed as such. Copyright © 2016 Elsevier Ltd. All rights reserved.
Construction Management--Exploding Some Myths.
ERIC Educational Resources Information Center
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
Improvement of the material and transport component of the system of construction waste management
NASA Astrophysics Data System (ADS)
Kostyshak, Mikhail; Lunyakov, Mikhail
2017-10-01
Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.
ERIC Educational Resources Information Center
Neupert, Kent E.; Baughn, C. Cristopher; Dao, Thi Thanh Lam
2005-01-01
Purpose: This paper identifies skills necessary in order to succeed in Vietnam and proposes a training program to develop such skills. Design/methodology/approach: To determine necessary skills, 74 managers were interviewed using critical incident methodology to identify training needs. Critical incident approach asks respondents to describe the…
Development of Management Methodology for Engineering Production Quality
NASA Astrophysics Data System (ADS)
Gorlenko, O.; Miroshnikov, V.; Borbatc, N.
2016-04-01
The authors of the paper propose four directions of the methodology developing the quality management of engineering products that implement the requirements of new international standard ISO 9001:2015: the analysis of arrangement context taking into account stakeholders, the use of risk management, management of in-house knowledge, assessment of the enterprise activity according to the criteria of effectiveness
Analyzing the outcomes of health promotion practices.
Pereira Lima, Vera Lucia Góes; Arruda, José Maria; Barroso, Maria Auxiliadora Bessa; Lobato Tavares, Maria de Fátima; Ribeiro Campos, Nora Zamith; Zandonadil, Regina Celi Moreira Basílio; da Rocha, Rosa Maria; Parreira, Clélia Maria de Souza Ferreira; Cohen, Simone Cynamon; Kligerman, Débora Cynamon; Sperandio, Ana Maria Girotti; Correa, Carlos Roberto Silveira; Serrano, Miguel Malo
2007-01-01
This article focuses on health promotion (HP) outcomes, illustrated through evaluation of case studies and identification of strategies which have contributed to their success and sustainability. Evaluation research and practice in three distinct sceneries are discussed: (i) institutional and governmental agencies; (ii) communities in the "Manguinhos Complex" and Nova Iguaqu Municipality, and (iii) building of potentially healthy municipality networks. The effectiveness of a social program in a health promotion perspective was based in the "School for Parents" program, undertaken by the First Court of Childhood and Youth of Rio de Janeiro, between 2001 and 2004. The analysis was grounded in the monitoring of 48 parents in charge of children under 18, who were victims of abuse, violence or negligence, and social exclusion, most of all. The study's objectives were: illustrating the evidence of effectiveness of health promotion, discussing the concept of HP effectiveness under macro unfavorable conditions, and identifying strategies that foster sustainability of results. Institutional resources included a multi-professional staff, multidisciplinary approaches, participatory workshops, family case management, partnership with public and private institutions, and volunteer and civil society sponsorship of the families. Evaluation was based on social impact indicators, and psychosocial and contextual determinants. Evaluation methods included program monitoring and quantitative-qualitative methods, through a longitudinal evaluation of 3 years, including one year post program. The evaluation showed highly favorable results concerning "family integration', "quality of family relations" and "human rights mobilization". Unsatisfactory results such as "lack of access to formal employment" are likely related to structural factors and the need for new public policies in areas such as education, professional training, housing, and access to formal employment. The training process of social actors in environmental management and housing, supported by the Public Health Technology Development Project of the Oswaldo Cruz Foundation, was employed as a tool of environmental education and healthy housing. The purpose of this study was to construct an integrated and participatory model of environment management. The methodology included training, research and evaluation of participants, from 21 to 50 years of age, who participated in building Thematic Learning Books and Community Guides about water quality monitoring. Participants'evaluations emphasized the training process, encouraging them to become multiplier agents of environmental education in their communities and to continue learning how to bring together sectors for problems solving. The Potentially Healthy Districts' Network (RMPS) aimed at increasing knowledge and building capacity to develop actions which originate from each of the local units, based on their characteristics and practices. Developed by the Preventive and Social Department of Campinas State University with PAHO/WHO and the Society Special Research Institute (IPES), RMPS's mission was to cooperate in the construction of healthy public policies in a participatory and articulated way through different municipal representatives. The network offered tools to municipal administrations to develop integrated projects that brought together government, managers, technicians, academy and organizations for the construction of public policies aimed at health promotion and quality of life. The methodology is based in the construction of knowledge and action networks by social actors, stimulating trans-sectorial and inter-district actions. The outcome evaluation is based on case studies, focus groups, oral stories, documents and image analyses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...
Flores, Yesica Yolanda Rangel
2016-01-01
ABSTRACT Objective: to analyze the influence of sexual violence on the perception and management of the risk of HIV in women married to migrants. Methods: study with an ethnographic approach carried out in urban and rural communities. Data were obtained by methodological triangulation, with participant and non-participant observation, as well as interviews. The informants were 21 women married to international migrants. The interviews were transcribed and discourse analysis was applied to them. Results: three categories emerged from the speeches to problematize the influence of sexual violence in the perception and management of the risk of HIV: "Characterization of sexual practices in the context of migration", "Experiences of sexual violence" and "Construction of the risk of HIV-AIDS". Conclusion: women have difficulty to recognize the acts of sexual violence in their daily lives, and their perceptions of risk are not decisive in the management of the threat to which they are exposed. Therefore, it is becoming increasingly urgent that nursing problematizes the sexual violence within "steady couples", as a challenge to the promotion of healthy lifestyles. PMID:27598375
Family caring strategies in neutropenia.
Eggenberger, Sandra K; Krumwiede, Norma; Meiers, Sonja J; Bliesmer, Mary; Earle, Patricia
2004-12-01
Aggressive chemotherapy protocols result in neutropenia in approximately half of all patients receiving chemotherapy. Thus, neutropenia continues to be a significant and potentially life-threatening side effect of treatment, even with use of colony-stimulating factors. Families of patients with neutropenia often provide the primary healing environment because most chemotherapy protocols are managed on an outpatient basis. To learn about the family's experience of managing chemotherapy-induced neutropenia (CIN), a grounded-theory methodology was used to analyze data from seven families. The central theme revealed by these families was "turbulent waiting with intensified connections." This meant that when families had a sense of greater vulnerability in response to the waiting after diagnosis of CIN, they connected intensely with each other and healthcare providers. Families reported that connections with nurses became more significant when neutropenia interrupted chemotherapy. Families also developed family caring strategies to manage this period of waiting for the chemotherapy to resume. These strategies included family inquiry, family vigilance, and family balancing. Nurses need to be aware of approaches to support the family's ability to manage CIN. Interventions and approaches constructed from the perspective of a family-professional partnership will enhance the family cancer experience as well as ongoing family growth and function.
Managing in the interprofessional environment: a theory of action perspective.
Rogers, Tim
2004-08-01
Managers of multidisciplinary teams face difficult dilemmas in managing competing interests, diverse perspectives and interpersonal conflicts. This paper illustrates the potential of the theory of action methodology of Argyris and Schön (1974, 1996) to illuminate these problems and contribute to their resolution. An empirical example of a depth-investigation with one multidisciplinary community health care team leader in Australia demonstrates that the theory of action offers a more accurate account of the causal dimensions of her dilemmas and provides more scope for effective intervention than her lay explanation will allow. It also provides a more satisfactory analysis of her difficulties with two common problems identified in the literature: defining the appropriate level of autonomy for team members and developing constructive dialogue across perceived discipline-based differences of opinion. Consequently the theory of action appears to offer enormous promise to managers of multidisciplinary teams wanting to understand and resolve their problems and develop a rigorous reflective practice. Further research on the viability of the theory to facilitate a self-correcting system that can promote learning even under conditions of stress and conflict is suggested and implications for learning and teaching for the multidisciplinary environment are briefly discussed.
An introduction to exemplar research: a definition, rationale, and conceptual issues.
Bronk, Kendall Cotton; King, Pamela Ebstyne; Matsuba, M Kyle
2013-01-01
The exemplar methodology represents a useful yet underutilized approach to studying developmental constructs. It features an approach to research whereby individuals, entities, or programs that exemplify the construct of interest in a particularly intense or highly developed manner compose the study sample. Accordingly, it reveals what the upper ends of development look like in practice. Utilizing the exemplar methodology allows researchers to glimpse not only what is but also what is possible with regard to the development of a particular characteristic. The present chapter includes a definition of the exemplar methodology, a discussion of some of key conceptual issues to consider when employing it in empirical studies, and a brief overview of the other chapters featured in this volume. © Wiley Periodicals, Inc.
Failure mode effect analysis and fault tree analysis as a combined methodology in risk management
NASA Astrophysics Data System (ADS)
Wessiani, N. A.; Yoshio, F.
2018-04-01
There have been many studies reported the implementation of Failure Mode Effect Analysis (FMEA) and Fault Tree Analysis (FTA) as a method in risk management. However, most of the studies usually only choose one of these two methods in their risk management methodology. On the other side, combining these two methods will reduce the drawbacks of each methods when implemented separately. This paper aims to combine the methodology of FMEA and FTA in assessing risk. A case study in the metal company will illustrate how this methodology can be implemented. In the case study, this combined methodology will assess the internal risks that occur in the production process. Further, those internal risks should be mitigated based on their level of risks.
Salimi, Parisa; Hamedi, Mohsen; Jamshidi, Nima; Vismeh, Milad
2017-04-01
Diabetes and its associated complications are realized as one of the most challenging medical conditions threatening more than 29 million people only in the USA. The forecasts suggest a suffering of more than half a billion worldwide by 2030. Amid all diabetic complications, diabetic foot ulcer (DFU) has attracted much scientific investigations to lead to a better management of this disease. In this paper, a system thinking methodology is adopted to investigate the dynamic nature of the ulceration. The causal loop diagram as a tool is utilized to illustrate the well-researched relations and interrelations between causes of the DFU. The result of clustering causality evaluation suggests a vicious loop that relates external trauma to callus. Consequently a hypothesis is presented which localizes development of foot ulceration considering distribution of normal and shear stress. It specifies that normal and tangential forces, as the main representatives of external trauma, play the most important role in foot ulceration. The evaluation of this hypothesis suggests the significance of the information related to both normal and shear stress for managing DFU. The results also discusses how these two react on different locations on foot such as metatarsal head, heel and hallux. The findings of this study can facilitate tackling the complexity of DFU problem and looking for constructive mitigation measures. Moreover they lead to developing a more promising methodology for managing DFU including better prognosis, designing prosthesis and insoles for DFU and patient caring recommendations. Copyright © 2017 Elsevier Ltd. All rights reserved.
Development of a design methodology for asphalt treated mixtures.
DOT National Transportation Integrated Search
2013-12-01
This report summarizes the results of a study that was conducted to develop a simplified design methodology for asphalt : treated mixtures that are durable, stable, constructible, and cost effective through the examination of the performance of : mix...
Development of Innovative Business Model of Modern Manager's Qualities
ERIC Educational Resources Information Center
Yashkova, Elena V.; Sineva, Nadezda L.; Shkunova, Angelika A.; Bystrova, Natalia V.; Smirnova, Zhanna V.; Kolosova, Tatyana V.
2016-01-01
The paper defines a complex of manager's qualities based on theoretical and methodological analysis and synthesis methods, available national and world literature, research papers and publications. The complex approach methodology was used, which provides an innovative view of the development of modern manager's qualities. The methodological…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-31
... Fishery Management Council (Council); Work Session To Review Proposed Salmon Methodology Changes AGENCY.... ACTION: Notice of a public meeting. SUMMARY: The Pacific Fishery Management Council's Salmon Technical Team (STT), Scientific and Statistical Committee (SSC) Salmon Subcommittee, and Model Evaluation...
Aniba, Mohamed Radhouene; Siguenza, Sophie; Friedrich, Anne; Plewniak, Frédéric; Poch, Olivier; Marchler-Bauer, Aron; Thompson, Julie Dawn
2009-01-01
The traditional approach to bioinformatics analyses relies on independent task-specific services and applications, using different input and output formats, often idiosyncratic, and frequently not designed to inter-operate. In general, such analyses were performed by experts who manually verified the results obtained at each step in the process. Today, the amount of bioinformatics information continuously being produced means that handling the various applications used to study this information presents a major data management and analysis challenge to researchers. It is now impossible to manually analyse all this information and new approaches are needed that are capable of processing the large-scale heterogeneous data in order to extract the pertinent information. We review the recent use of integrated expert systems aimed at providing more efficient knowledge extraction for bioinformatics research. A general methodology for building knowledge-based expert systems is described, focusing on the unstructured information management architecture, UIMA, which provides facilities for both data and process management. A case study involving a multiple alignment expert system prototype called AlexSys is also presented.
Aniba, Mohamed Radhouene; Siguenza, Sophie; Friedrich, Anne; Plewniak, Frédéric; Poch, Olivier; Marchler-Bauer, Aron
2009-01-01
The traditional approach to bioinformatics analyses relies on independent task-specific services and applications, using different input and output formats, often idiosyncratic, and frequently not designed to inter-operate. In general, such analyses were performed by experts who manually verified the results obtained at each step in the process. Today, the amount of bioinformatics information continuously being produced means that handling the various applications used to study this information presents a major data management and analysis challenge to researchers. It is now impossible to manually analyse all this information and new approaches are needed that are capable of processing the large-scale heterogeneous data in order to extract the pertinent information. We review the recent use of integrated expert systems aimed at providing more efficient knowledge extraction for bioinformatics research. A general methodology for building knowledge-based expert systems is described, focusing on the unstructured information management architecture, UIMA, which provides facilities for both data and process management. A case study involving a multiple alignment expert system prototype called AlexSys is also presented. PMID:18971242
Multicriteria methodological approach to manage urban air pollution
NASA Astrophysics Data System (ADS)
Vlachokostas, Ch.; Achillas, Ch.; Moussiopoulos, N.; Banias, G.
2011-08-01
Managing urban air pollution necessitates a feasible and efficient abatement strategy which is characterised as a defined set of specific control measures. In practice, hard budget constraints are present in any decision-making process and therefore available alternatives need to be hierarchised in a fast but still reliable manner. Moreover, realistic strategies require adequate information on the available control measures, taking also into account the area's special characteristics. The selection of the most applicable bundle of measures rests in achieving stakeholders' consensus, while taking into consideration mutually conflicting views and criteria. A preliminary qualitative comparison of alternative control measures would be most handy for decision-makers, forming the grounds for an in-depth analysis of the most promising ones. This paper presents an easy-to-follow multicriteria methodological approach in order to include and synthesise multi-disciplinary knowledge from various stakeholders so as to result into a priority list of abatement options, achieve consensus and secure the adoption of the resulting optimal solution. The approach relies on the active involvement of public authorities and local stakeholders in order to incorporate their environmental, economic and social preferences. The methodological scheme is implemented for the case of Thessaloniki, Greece, an area considered among the most polluted cities within Europe, especially with respect to airborne particles. Intense police control, natural gas penetration in buildings and metro construction equally result into the most "promising" alternatives in order to control air pollution in the GTA. The three optimal alternatives belong to different thematic areas, namely road transport, thermal heating and infrastructure. Thus, it is obvious that efforts should spread throughout all thematic areas. Natural gas penetration in industrial units, intense monitoring of environmental standards and regular maintenance of heavy oil burners are ranked as 4th, 5th and 6th optimal alternatives, respectively.
Management of construction and demolition wastes as secondary building resources
NASA Astrophysics Data System (ADS)
Manukhina, Lyubov; Ivanova, Irina
2017-10-01
The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.
Construction Management: Building Schools Faster in the International Marketplace
ERIC Educational Resources Information Center
Scarano, Joseph J.
1976-01-01
Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bassi, Andrea, E-mail: ab395@bath.co.uk; Howard, Robert, E-mail: robhoward@constcom.demon.co.uk; Geneletti, Davide, E-mail: davide.geneletti@ing.unitn.it
This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline commonmore » good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up. - Highlights: Black-Right-Pointing-Pointer The Italian and the UK Environmental Impact Assessment systems are compared. Black-Right-Pointing-Pointer The research is centred on the construction industry. Black-Right-Pointing-Pointer Issues and shortcomings are analysed by investigating six case studies. Black-Right-Pointing-Pointer Integration of EIA with sustainability principles is appraised. Black-Right-Pointing-Pointer General guidelines are provided to assist practitioners in the two national contexts.« less
Rivo, Eduardo; de la Fuente, Javier; Rivo, Ángel; García-Fontán, Eva; Cañizares, Miguel-Ángel; Gil, Pedro
2012-01-01
The aim of this study was to assess the applicability of knowledge discovery in database methodology, based upon data mining techniques, to the investigation of lung cancer surgery. According to CRISP 1.0 methodology, a data mining (DM) project was developed on a data warehouse containing records for 501 patients operated on for lung cancer with curative intention. The modelling technique was logistic regression. The finally selected model presented the following values: sensitivity 9.68%, specificity 100%, global precision 94.02%, positive predictive value 100% and negative predictive value 93.98% for a cut-off point set at 0.5. A receiver operating characteristic (ROC) curve was constructed. The area under the curve (CI 95%) was 0.817 (0.740- 0.893) (p < 0.05). Statistical association with perioperative mortality was found for the following variables [odds ratio (CI 95%)]: age over 70 [2.3822 (1.0338-5.4891)], heart disease [2.4875 (1.0089-6.1334)], peripheral arterial disease [5.7705 (1.9296-17.2570)], pneumonectomy [3.6199 (1.4939-8.7715)] and length of surgery (min) [1.0067 (1.0008-1.0126)]. The CRISP-DM process model is very suitable for lung cancer surgery analysis, improving decision making as well as knowledge and quality management.
Space-planning and structural solutions of low-rise buildings: Optimal selection methods
NASA Astrophysics Data System (ADS)
Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander
2017-11-01
The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.
Software Requirements Engineering Methodology (Development)
1979-06-01
Higher Order Software [20]; and the Michael Jackson Design Methodology [21]. Although structured programming constructs have proven to be more useful...reviewed here. Similarly, the manual techniques for software design (e.g., HIPO Diagrams, Nassi-Schneidermann charts, Top-Down Design, the Michael ... Jackson Design Methodology, Yourdon’s Structured Design) are not addressed. 6.1.3 Research Programs There are a number of research programs underway
A Clustering Methodology of Web Log Data for Learning Management Systems
ERIC Educational Resources Information Center
Valsamidis, Stavros; Kontogiannis, Sotirios; Kazanidis, Ioannis; Theodosiou, Theodosios; Karakos, Alexandros
2012-01-01
Learning Management Systems (LMS) collect large amounts of data. Data mining techniques can be applied to analyse their web data log files. The instructors may use this data for assessing and measuring their courses. In this respect, we have proposed a methodology for analysing LMS courses and students' activity. This methodology uses a Markov…
48 CFR 836.602-2 - Evaluation boards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
Applying Sensor-Based Technology to Improve Construction Safety Management.
Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng
2017-08-11
Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.
Applying Sensor-Based Technology to Improve Construction Safety Management
Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng
2017-01-01
Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions. PMID:28800061
NASA Astrophysics Data System (ADS)
Nebot, Àngela; Mugica, Francisco
2012-10-01
Fuzzy inductive reasoning (FIR) is a modelling and simulation methodology derived from the General Systems Problem Solver. It compares favourably with other soft computing methodologies, such as neural networks, genetic or neuro-fuzzy systems, and with hard computing methodologies, such as AR, ARIMA, or NARMAX, when it is used to predict future behaviour of different kinds of systems. This paper contains an overview of the FIR methodology, its historical background, and its evolution.
A review of risk management process in construction projects of developing countries
NASA Astrophysics Data System (ADS)
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...
48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...
48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...
48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...
Internet-based Interactive Construction Management Learning System.
ERIC Educational Resources Information Center
Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy
2001-01-01
Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…
Research on Chinese Intelligent Guanglianda in High-rise Construction
NASA Astrophysics Data System (ADS)
Romanovich, Marina; Shi, Peiyu; Wang, Ziyue; Zhao, Liang; Gerasimova, Vera
2018-03-01
Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.
The method of selecting an integrated development territory for the high-rise unique constructions
NASA Astrophysics Data System (ADS)
Sheina, Svetlana; Shevtsova, Elina; Sukhinin, Alexander; Priss, Elena
2018-03-01
On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.
Towards adaptive and integrated management paradigms to meet the challenges of water governance.
Halbe, J; Pahl-Wostl, C; Sendzimir, J; Adamowski, J
2013-01-01
Integrated Water Resource Management (IWRM) aims at finding practical and sustainable solutions to water resource issues. Research and practice have shown that innovative methods and tools are not sufficient to implement IWRM - the concept needs to also be integrated in prevailing management paradigms and institutions. Water governance science addresses this human dimension by focusing on the analysis of regulatory processes that influence the behavior of actors in water management systems. This paper proposes a new methodology for the integrated analysis of water resources management and governance systems in order to elicit and analyze case-specific management paradigms. It builds on the Management and Transition Framework (MTF) that allows for the examination of structures and processes underlying water management and governance. The new methodology presented in this paper combines participatory modeling and analysis of the governance system by using the MTF to investigate case-specific management paradigms. The linking of participatory modeling and research on complex management and governance systems allows for the transfer of knowledge between scientific, policy, engineering and local communities. In this way, the proposed methodology facilitates assessment and implementation of transformation processes towards IWRM that require also the adoption of adaptive management principles. A case study on flood management in the Tisza River Basin in Hungary is provided to illustrate the application of the proposed methodology.
Quality in physical therapist clinical education: a systematic review.
McCallum, Christine A; Mosher, Peter D; Jacobson, Peri J; Gallivan, Sean P; Giuffre, Suzanne M
2013-10-01
Many factors affect student learning throughout the clinical education (CE) component of professional (entry-level) physical therapist education curricula. Physical therapist education programs (PTEPs) manage CE, yet the material and human resources required to provide CE are generally overseen by community-based physical therapist practices. The purposes of this systematic review were: (1) to examine how the construct of quality is defined in CE literature and (2) to determine the methodological rigor of the available evidence on quality in physical therapist CE. This study was a systematic review of English-language journals using the American Physical Therapy Association's Open Door Portal to Evidence-Based Practice as the computer search engine. The search was categorized using terms for physical therapy and quality and for CE pedagogy and models or roles. Summary findings were characterized by 5 primary themes and 14 subthemes using a qualitative-directed content analysis. Fifty-four articles were included in the study. The primary quality themes were: CE framework, CE sites, structure of CE, assessment in CE, and CE faculty. The methodological rigor of the studies was critically appraised using a binary system based on the McMaster appraisal tools. Scores ranged from 3 to 14. Publication bias and outcome reporting bias may be inherent limitations to the results. The review found inconclusive evidence about what constitutes quality or best practice for physical therapist CE. Five key constructs of CE were identified that, when aggregated, could construe quality.
ERIC Educational Resources Information Center
Rajaeipoor, Saeed; Siadat, Ali; Hoveida, Reza; Mohammadi, Nazanin; Keshavarz, Akbar; Salimi, Mohammad Hossein; Abbasian, Mohammad Reza; Shamsi, Ali
2015-01-01
The objective of the present study is considering the relationship between EQ & constructive and non-constructive problem solving styles among students. The applied methodology is cross-correlation method. The statistical population in this study is all the educational sciences' students of Payame Noor university of Abadan in the year 2014 and…
Validation of Multilevel Constructs: Validation Methods and Empirical Findings for the EDI
ERIC Educational Resources Information Center
Forer, Barry; Zumbo, Bruno D.
2011-01-01
The purposes of this paper are to highlight the foundations of multilevel construct validation, describe two methodological approaches and associated analytic techniques, and then apply these approaches and techniques to the multilevel construct validation of a widely-used school readiness measure called the Early Development Instrument (EDI;…
Tunnel and Station Cost Methodology : Mined Tunnels
DOT National Transportation Integrated Search
1983-01-01
The main objective of this study was to develop a model for estimating the cost of subway station and tunnel construction. This report describes a cost estimating methodology for subway tunnels that can be used by planners, designers, owners, and gov...
Tunnel and Station Cost Methodology Volume II: Stations
DOT National Transportation Integrated Search
1981-01-01
The main objective of this study was to develop a model for estimating the cost of subway station and tunnel construction. This report describes a cost estimating methodology for subway tunnels that can be used by planners, designers, owners, and gov...
NASA Astrophysics Data System (ADS)
Ghodsi, Seyed Hamed; Kerachian, Reza; Estalaki, Siamak Malakpour; Nikoo, Mohammad Reza; Zahmatkesh, Zahra
2016-02-01
In this paper, two deterministic and stochastic multilateral, multi-issue, non-cooperative bargaining methodologies are proposed for urban runoff quality management. In the proposed methodologies, a calibrated Storm Water Management Model (SWMM) is used to simulate stormwater runoff quantity and quality for different urban stormwater runoff management scenarios, which have been defined considering several Low Impact Development (LID) techniques. In the deterministic methodology, the best management scenario, representing location and area of LID controls, is identified using the bargaining model. In the stochastic methodology, uncertainties of some key parameters of SWMM are analyzed using the info-gap theory. For each water quality management scenario, robustness and opportuneness criteria are determined based on utility functions of different stakeholders. Then, to find the best solution, the bargaining model is performed considering a combination of robustness and opportuneness criteria for each scenario based on utility function of each stakeholder. The results of applying the proposed methodology in the Velenjak urban watershed located in the northeastern part of Tehran, the capital city of Iran, illustrate its practical utility for conflict resolution in urban water quantity and quality management. It is shown that the solution obtained using the deterministic model cannot outperform the result of the stochastic model considering the robustness and opportuneness criteria. Therefore, it can be concluded that the stochastic model, which incorporates the main uncertainties, could provide more reliable results.
HSTDEK: Developing a methodology for construction of large-scale, multi-use knowledge bases
NASA Technical Reports Server (NTRS)
Freeman, Michael S.
1987-01-01
The primary research objectives of the Hubble Space Telescope Design/Engineering Knowledgebase (HSTDEK) are to develop a methodology for constructing and maintaining large scale knowledge bases which can be used to support multiple applications. To insure the validity of its results, this research is being persued in the context of a real world system, the Hubble Space Telescope. The HSTDEK objectives are described in detail. The history and motivation of the project are briefly described. The technical challenges faced by the project are outlined.
A methodology for conducting underwater archaeological surveys : final report.
DOT National Transportation Integrated Search
1990-01-01
Departments of transportation and other construction agencies are required to locate and conserve cultural resources located in the area of a construction project. Although most organizations have procedures for locating cultural resources on land, t...
NASA Astrophysics Data System (ADS)
Weerasinghe, Harshi; Schneider, Uwe A.
2010-05-01
Assessment of economically optimal water management and geospatial potential for large-scale water storage Weerasinghe, Harshi; Schneider, Uwe A Water is an essential but limited and vulnerable resource for all socio-economic development and for maintaining healthy ecosystems. Water scarcity accelerated due to population expansion, improved living standards, and rapid growth in economic activities, has profound environmental and social implications. These include severe environmental degradation, declining groundwater levels, and increasing problems of water conflicts. Water scarcity is predicted to be one of the key factors limiting development in the 21st century. Climate scientists have projected spatial and temporal changes in precipitation and changes in the probability of intense floods and droughts in the future. As scarcity of accessible and usable water increases, demand for efficient water management and adaptation strategies increases as well. Addressing water scarcity requires an intersectoral and multidisciplinary approach in managing water resources. This would in return safeguard the social welfare and the economical benefit to be at their optimal balance without compromising the sustainability of ecosystems. This paper presents a geographically explicit method to assess the potential for water storage with reservoirs and a dynamic model that identifies the dimensions and material requirements under an economically optimal water management plan. The methodology is applied to the Elbe and Nile river basins. Input data for geospatial analysis at watershed level are taken from global data repositories and include data on elevation, rainfall, soil texture, soil depth, drainage, land use and land cover; which are then downscaled to 1km spatial resolution. Runoff potential for different combinations of land use and hydraulic soil groups and for mean annual precipitation levels are derived by the SCS-CN method. Using the overlay and decision tree algorithms in GIS, potential water storage sites are identified for constructing regional reservoirs. Subsequently, sites are prioritized based on runoff generation potential (m3 per unit area), and geographical suitability for constructing storage structures. The results from the spatial analysis are used as input for the optimization model. Allocation of resources and appropriate dimension for dams and associated structures are identified using the optimization model. The model evaluates the capability of alternative reservoirs for cost-efficient water management. The Geographic Information System is used to store, analyze, and integrate spatially explicit and non-spatial attribute information whereas the algebraic modeling platform is used to develop the dynamic optimization model. The results of this methodology are validated over space against satellite remote sensing data and existing data on reservoir capacities and runoff. The method is suitable for application of on-farm water storage structures, water distribution networks, and moisture conservation structures in a global context.
NASA Astrophysics Data System (ADS)
Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul
2017-08-01
Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.
Intelligent approach to prognostic enhancements of diagnostic systems
NASA Astrophysics Data System (ADS)
Vachtsevanos, George; Wang, Peng; Khiripet, Noppadon; Thakker, Ash; Galie, Thomas R.
2001-07-01
This paper introduces a novel methodology to prognostics based on a dynamic wavelet neural network construct and notions from the virtual sensor area. This research has been motivated and supported by the U.S. Navy's active interest in integrating advanced diagnostic and prognostic algorithms in existing Naval digital control and monitoring systems. A rudimentary diagnostic platform is assumed to be available providing timely information about incipient or impending failure conditions. We focus on the development of a prognostic algorithm capable of predicting accurately and reliably the remaining useful lifetime of a failing machine or component. The prognostic module consists of a virtual sensor and a dynamic wavelet neural network as the predictor. The virtual sensor employs process data to map real measurements into difficult to monitor fault quantities. The prognosticator uses a dynamic wavelet neural network as a nonlinear predictor. Means to manage uncertainty and performance metrics are suggested for comparison purposes. An interface to an available shipboard Integrated Condition Assessment System is described and applications to shipboard equipment are discussed. Typical results from pump failures are presented to illustrate the effectiveness of the methodology.
The Development of A Performance Measurement Concept for the Royal Australian Air Force
1992-09-01
knowledge of management accounting and performance measurement techniques. As the RAAF currently has no cost management and performance measurement system...provides a review of the current literature on management accounting for performance measurement, specifically referring to the problems of using...traditional management accounting methodologies as a basis for formulating performance measures. Chapter III explains the methodology used to conduct the
NASA Astrophysics Data System (ADS)
Lapidus, Azary; Abramov, Ivan
2018-03-01
Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).
A risk assessment methodology for critical transportation infrastructure.
DOT National Transportation Integrated Search
2002-01-01
Infrastructure protection typifies a problem of risk assessment and management in a large-scale system. This study offers a methodological framework to identify, prioritize, assess, and manage risks. It includes the following major considerations: (1...
Prat, P; Aulinas, M; Turon, C; Comas, J; Poch, M
2009-01-01
Current management of sanitation infrastructures (sewer systems, wastewater treatment plant, receiving water, bypasses, deposits, etc) is not fulfilling the objectives of up to date legislation, to achieve a good ecological and chemical status of water bodies through integrated management. These made it necessary to develop new methodologies that help decision makers to improve the management in order to achieve that status. Decision Support Systems (DSS) based on Multi-Agent System (MAS) paradigm are promising tools to improve the integrated management. When all the different agents involved interact, new important knowledge emerges. This knowledge can be used to build better DSS and improve wastewater infrastructures management achieving the objectives planned by legislation. The paper describes a methodology to acquire this knowledge through a Role Playing Game (RPG). First of all there is an introduction about the wastewater problems, a definition of RPG, and the relation between RPG and MAS. Then it is explained how the RPG was built with two examples of game sessions and results. The paper finishes with a discussion about the uses of this methodology and future work.
2016 Workplace and Gender Relations Survey of Active Duty Members: Overview Report
2017-05-01
Grifka 1 Chapter 2: Survey Methodology Ms. Lisa Davis, Mr. Eric Falk, and Mr. Jeff Schneider 19 Chapter 3: Estimated Sexual Assault...assessing the gender relations environment across the Services. Study Background and Methodology Study Background The Defense Research, Surveys, and...gender discrimination. 3 Chapter 1 provides additional information on the construction of these metrics. Survey Methodology OPA conducts DoD cross
2016 Service Academy Gender Relations Survey: Overview Report
2017-02-01
environment within the Academies. This Executive Summary will provide a summary of the methodology used and the top line results from the survey.1 Summary...discussion of the measurement constructs, a description of the survey methodology , and detailed presentation of the results. Each report section...are determined statistically significant at an alpha (α) level of .05.6 Survey Methodology Statistical Design OPA conducts cross-Service surveys that
Megacity analysis: a clustering approach to classification
2017-06-01
kinetic or non -kinetic urban operations. We develop and implement a methodology to classify megacities into groups. Using 33 variables, we construct a...is interested in these megacity networks and their implications for potential urban operations. We develop a methodology to group like megacities...is interested in these megacity networks and their implications for potential urban operations. We develop a methodology to group like megacities
NASA Astrophysics Data System (ADS)
Xing, Yuanzhi; Deng, Xiaoyi
2017-11-01
The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.
Information systems for material flow management in construction processes
NASA Astrophysics Data System (ADS)
Mesároš, P.; Mandičák, T.
2015-01-01
The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.
Jeong, Sohyun; Han, Nayoung; Choi, Boyoon; Sohn, Minji; Song, Yun-Kyoung; Chung, Myeon-Woo; Na, Han-Sung; Ji, Eunhee; Kim, Hyunah; Rhew, Ki Yon; Kim, Therasa; Kim, In-Wha; Oh, Jung Mi
2016-06-01
To construct a database of published clinical drug trials suitable for use 1) as a research tool in accessing clinical trial information and 2) in evidence-based decision-making by regulatory professionals, clinical research investigators, and medical practitioners. Comprehensive information obtained from a search of design elements and results of clinical trials in peer reviewed journals using PubMed (http://www.ncbi.nlm.ih.gov/pubmed). The methodology to develop a structured database was devised by a panel composed of experts in medical, pharmaceutical, information technology, and members of Ministry of Food and Drug Safety (MFDS) using a step by step approach. A double-sided system consisting of user mode and manager mode served as the framework for the database; elements of interest from each trial were entered via secure manager mode enabling the input information to be accessed in a user-friendly manner (user mode). Information regarding methodology used and results of drug treatment were extracted as detail elements of each data set and then inputted into the web-based database system. Comprehensive information comprising 2,326 clinical trial records, 90 disease states, and 939 drugs entities and concerning study objectives, background, methods used, results, and conclusion could be extracted from published information on phase II/III drug intervention clinical trials appearing in SCI journals within the last 10 years. The extracted data was successfully assembled into a clinical drug trial database with easy access suitable for use as a research tool. The clinically most important therapeutic categories, i.e., cancer, cardiovascular, respiratory, neurological, metabolic, urogenital, gastrointestinal, psychological, and infectious diseases were covered by the database. Names of test and control drugs, details on primary and secondary outcomes and indexed keywords could also be retrieved and built into the database. The construction used in the database enables the user to sort and download targeted information as a Microsoft Excel spreadsheet. Because of the comprehensive and standardized nature of the clinical drug trial database and its ease of access it should serve as valuable information repository and research tool for accessing clinical trial information and making evidence-based decisions by regulatory professionals, clinical research investigators, and medical practitioners.
ERIC Educational Resources Information Center
Molina, Otilia Alejandro; Ratté, Sylvie
2017-01-01
This research introduces a method to construct a unified representation of teachers and students perspectives based on the actionable knowledge discovery (AKD) and delivery framework. The representation is constructed using two models: one obtained from student evaluations and the other obtained from teachers' reflections about their teaching…
75 FR 61577 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... workers certified in the top five industries were as follows: Construction--30,242; Amusement, Gambling... employment in each of these industries: Construction--0.4 percent (30,242/7,265,648); Amusement, Gambling... permitted each year: Construction--0.2 percent (14,756/7,265,648); Amusement, Gambling, and Recreation--0.5...
Developing Visualization Techniques for Semantics-based Information Networks
NASA Technical Reports Server (NTRS)
Keller, Richard M.; Hall, David R.
2003-01-01
Information systems incorporating complex network structured information spaces with a semantic underpinning - such as hypermedia networks, semantic networks, topic maps, and concept maps - are being deployed to solve some of NASA s critical information management problems. This paper describes some of the human interaction and navigation problems associated with complex semantic information spaces and describes a set of new visual interface approaches to address these problems. A key strategy is to leverage semantic knowledge represented within these information spaces to construct abstractions and views that will be meaningful to the human user. Human-computer interaction methodologies will guide the development and evaluation of these approaches, which will benefit deployed NASA systems and also apply to information systems based on the emerging Semantic Web.
Modelling operations and security of cloud systems using Z-notation and Chinese Wall security policy
NASA Astrophysics Data System (ADS)
Basu, Srijita; Sengupta, Anirban; Mazumdar, Chandan
2016-11-01
Enterprises are increasingly using cloud computing for hosting their applications. Availability of fast Internet and cheap bandwidth are causing greater number of people to use cloud-based services. This has the advantage of lower cost and minimum maintenance. However, ensuring security of user data and proper management of cloud infrastructure remain major areas of concern. Existing techniques are either too complex, or fail to properly represent the actual cloud scenario. This article presents a formal cloud model using the constructs of Z-notation. Principles of the Chinese Wall security policy have been applied to design secure cloud-specific operations. The proposed methodology will enable users to safely host their services, as well as process sensitive data, on cloud.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Using Construction Management for Public and Institutional Facilities.
ERIC Educational Resources Information Center
Public Technology, Inc., Washington, DC.
Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
NASA Astrophysics Data System (ADS)
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Cui, De-Mi; Wang, Xiao-Quan; Lu, Lie-Min
2017-01-01
Low strain pile integrity testing (LSPIT), due to its simplicity and low cost, is one of the most popular NDE methods used in pile foundation construction. While performing LSPIT in the field is generally quite simple and quick, determining the integrity of the test piles by analyzing and interpreting the test signals (reflectograms) is still a manual process performed by experienced experts only. For foundation construction sites where the number of piles to be tested is large, it may take days before the expert can complete interpreting all of the piles and delivering the integrity assessment report. Techniques that can automate test signal interpretation, thus shortening the LSPIT’s turnaround time, are of great business value and are in great need. Motivated by this need, in this paper, we develop a computer-aided reflectogram interpretation (CARI) methodology that can interpret a large number of LSPIT signals quickly and consistently. The methodology, built on advanced signal processing and machine learning technologies, can be used to assist the experts in performing both qualitative and quantitative interpretation of LSPIT signals. Specifically, the methodology can ease experts’ interpretation burden by screening all test piles quickly and identifying a small number of suspected piles for experts to perform manual, in-depth interpretation. We demonstrate the methodology’s effectiveness using the LSPIT signals collected from a number of real-world pile construction sites. The proposed methodology can potentially enhance LSPIT and make it even more efficient and effective in quality control of deep foundation construction. PMID:29068431
A value-based taxonomy of improvement approaches in healthcare.
Colldén, Christian; Gremyr, Ida; Hellström, Andreas; Sporraeus, Daniella
2017-06-19
Purpose The concept of value is becoming increasingly fashionable in healthcare and various improvement approaches (IAs) have been introduced with the aim of increasing value. The purpose of this paper is to construct a taxonomy that supports the management of parallel IAs in healthcare. Design/methodology/approach Based on previous research, this paper proposes a taxonomy that includes the dimensions of view on value and organizational focus; three contemporary IAs - lean, value-based healthcare, and patient-centered care - are related to the taxonomy. An illustrative qualitative case study in the context of psychiatric (psychosis) care is then presented that contains data from 23 interviews and focuses on the value concept, IAs, and the proposed taxonomy. Findings Respondents recognized the dimensions of the proposed taxonomy and indicated its usefulness as support for choosing and combining different IAs into a coherent management model, and for facilitating dialog about IAs. The findings also suggested that the view of value as "health outcomes" is widespread, but healthcare professionals are less likely than managers to also view value as a process. Originality/value The conceptual contribution of this paper is to delineate some important characteristics of IAs in relation to the emerging "value era". It also highlights the coexistence of different IAs in healthcare management practice. A taxonomy is proposed that can help managers choose, adapt, and combine IAs in local management models.
Disease Management Evaluation: A Comprehensive Review of Current State of the Art.
Conklin, Annalijn; Nolte, Ellen
2011-01-01
Many countries across Europe and elsewhere have been experimenting with various structured approaches to manage patients with chronic illness as a way to improve quality of care, reduce costs and lead to better population health outcomes in the long run. Despite a body of studies of disease management interventions, uncertainty about the effects of these remains not least because current guidance on evaluation methods and metrics require further development to enhance scientific rigour while also being practical in routine operations. This article provides details from a report that reviews the academic and grey literature to help advance the task of improving the science of assessing disease management initiatives in Europe. Challenges identified are methodological, analytical and conceptual in nature, with a key issue being the establishment of the counterfactual. An array of sophisticated statistical techniques and analytical frameworks can assist in the construction of a sound comparison strategy when a randomised controlled trial is not possible. Issues to consider include: a clear framework of the mechanisms of action and expected effects of disease management; an understanding of the characteristics of disease management (scope, content, dose, context), and of the intervention and target populations (disease type, severity, case-mix); a period of observation over multiple years; and a logical link between performance measures and the intervention's aims and underlying theory of behaviour change.
Teaching Research Methodology through Active Learning
ERIC Educational Resources Information Center
Lundahl, Brad W.
2008-01-01
To complement traditional learning activities in a masters-level research methodology course, social work students worked on a formal research project which involved: designing the study, constructing measures, selecting a sampling strategy, collecting data, reducing and analyzing data, and finally interpreting and communicating the results. The…
Patients with chronic kidney disease: safety aspects in the preoperative management.
Malovrh, Marko
2015-01-01
Chronic kidney disease (CKD) is a major public health problem worldwide. Early detection and treatment of CKD can often prevent or delay some of the negative outcomes of CKD. This chapter shows how treatment of hypertension, proteinuria and metabolic disorders slow down the deterioration of renal function. Irrespective of the mode of renal replacement therapy, maintaining the veins in the upper extremities is of vital importance. Below are suggestions on how to protect blood vessels of the upper limbs and when to start preparing for the construction of vascular access. In this chapter, it is also shown how necessary it is to conduct a clinical evaluation of the blood vessels, which is required before the start of vascular access management. The methodology of noninvasive evaluation of vessels by duplex sonography is also presented. This method is very useful, especially if the vessels are not clinically visible, as well as the information concerning the morphological and functional properties of blood vessels. © 2015 S. Karger AG, Basel
NASA Astrophysics Data System (ADS)
Koptev, V. Yu
2017-02-01
The work represents the results of studying basic interconnected criteria of separate equipment units of the transport network machines fleet, depending on production and mining factors to improve the transport systems management. Justifying the selection of a control system necessitates employing new methodologies and models, augmented with stability and transport flow criteria, accounting for mining work development dynamics on mining sites. A necessary condition is the accounting of technical and operating parameters related to vehicle operation. Modern open pit mining dispatching systems must include such kinds of the information database. An algorithm forming a machine fleet is presented based on multi-variation task solution in connection with defining reasonable operating features of a machine working as a part of a complex. Proposals cited in the work may apply to mining machines (drilling equipment, excavators) and construction equipment (bulldozers, cranes, pile-drivers), city transport and other types of production activities using machine fleet.
Wong, Ming-Chao; Almond, Helen; Cummings, Elizabeth; Roehrer, Erin; Showell, Chris; Turner, Paul
2015-01-01
This chapter explores how Techno-Anthropology can contribute to more explicitly professional and ethically responsible reflections on the socio-technical practices involved in meaningfully engaging patients in health informatics research. The chapter draws on insights from health informatics research projects focused on chronic disease and self-management conducted in Tasmania during the last 10 years. Through these projects the paper explores three topics of relevance to 'meaningful engagement' with patients: (i) Patient Self-Management and Chronic Disease (ii) Patients as Users in Health Informatics research, and, (iii) Evaluations of outcomes in Health and Health Informatics Interventions. Techno-Anthropological reflections are then discussed through the concepts of liminality, polyphony and power. This chapter argues that beyond its contribution to methodology, an important role for Techno-Anthropology in patient centred health informatics research may be its capacity to support new ways of conceptualising and critically reflecting on the construction and mediation of patients' needs, values and perspectives.
Armstrong, Patrick Ian; Vogel, David L
2010-04-01
The current article replies to comments made by Lent, Sheu, and Brown (2010) and Lubinski (2010) regarding the study "Interpreting the Interest-Efficacy Association From a RIASEC Perspective" (Armstrong & Vogel, 2009). The comments made by Lent et al. and Lubinski highlight a number of important theoretical and methodological issues, including the process of defining and differentiating between constructs, the assumptions underlying Holland's (1959, 1997) RIASEC (Realistic, Investigative, Artistic, Social, Enterprising, and Conventional types) model and interrelations among constructs specified in social cognitive career theory (SCCT), the importance of incremental validity for evaluating constructs, and methodological considerations when quantifying interest-efficacy correlations and for comparing models using multivariate statistical methods. On the basis of these comments and previous research on the SCCT and Holland models, we highlight the importance of considering multiple theoretical perspectives in vocational research and practice. Alternative structural models are outlined for examining the role of interests, self-efficacy, learning experiences, outcome expectations, personality, and cognitive abilities in the career choice and development process. PsycINFO Database Record (c) 2010 APA, all rights reserved.
Two-stage commercial evaluation of engineering systems production projects for high-rise buildings
NASA Astrophysics Data System (ADS)
Bril, Aleksander; Kalinina, Olga; Levina, Anastasia
2018-03-01
The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.
NASA Astrophysics Data System (ADS)
Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.
2016-08-01
Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.
ERIC Educational Resources Information Center
Burgoyne, Ursula; Hull, Oksana
2007-01-01
This document presents the methodology and literature review for the research report "Classroom Management Strategies to Address the Needs of Sudanese Refugee Learners" (ED499673), which examined the extent to which English language, literacy and numeracy teachers used classroom management strategies to meet the needs of adult Sudanese…
ERIC Educational Resources Information Center
Brember, V. L.
1985-01-01
Presents Checkland's soft systems methodology, discusses it in terms of the systems approach, and illustrates how it was used to relate evidence of user survey to practical problems of library management. Difficulties in using methodology are described and implications for library management and information science research are presented. (8…
Canadian Innovations in Siting Hazardous Waste Management Facilities
Kuhn; Ballard
1998-07-01
/ Siting hazardous waste facilities is an extremely complex and difficult endeavor. Public aversion to the construction of these facilities in or near their community often results in concerted opposition, referred to as the NIMBY syndrome. For the most part, siting processes do not fail because of inadequate environmental or technical considerations, but because of the adversarial decision-making strategies employed by the proponents. Innovative siting processes used in the provinces of Alberta and Manitoba offer tangible evidence of the successful application of an innovative siting approach based on the principles of decentralization of decision-making authority and full and meaningful public involvement. The purpose of this paper is to evaluate four Canadian siting processes from the perspective of public participation and access to decision-making authority. Examples of siting processes related to hazardous waste management facilities are provided from the provinces of Alberta, Manitoba, British Columbia, and Ontario. Siting has evolved from approaches dominated by top-down decision making to increasing decentralized and pluralistic approaches. Focusing on social and political concerns of potentially affected communities and on the process of decision making itself are fundamental to achieving siting success. In Alberta initially, and later in Manitoba, this new "open approach" to siting has resulted in the construction of the first two comprehensive hazardous waste treatment facilities in Canada.KEY WORDS: Hazardous waste facilities; Siting methodologies; Public participation
Godard, Béatrice; Moubé, Zéphirin
2013-01-01
It is inmportant to emphasize three aspects concerning the construction and teaching of 'French bioethics: the maintenance and promotion ofa multidisciplinary approach; a greater autonomy in the management and development of training programs; positioning a power of attraction and development in French-speaking countries. Bioethics is defined as a field of interdisciplinary studies at the junction of the health sciences and the humanities and, more importantly, directly connected to the reality of the health community, research and public Policy. A greater autonomy in the management and development of training programs is also capital. The danger of being dominated by one discipline involved whether medicine, law, philosophy, theology is real and prevents from promoting methodological approaches that are both theoretical and empirical. Finally, compliance with local and national, but also disciplinary diversity is essential to the construction and teaching of French bioethics. As such, the University of Montreal has positioned itself as a leader in the French-speaking countries: at the junction of North America and European countries, Quebec has developed its own specificity in bioethics, which is a force of attraction for many countries of the French-speaking world. In this context, the Bioethics Programs at the University of Montreal rely heavily on knowledge transfer to other cultures. Moreover, the internationalization of training programs in French bioethics is a major issue in the current context of globalization and transmission of knowledge.
42 CFR 441.18 - Case management services.
Code of Federal Regulations, 2010 CFR
2010-10-01
...; (ii) The qualifications of case management providers; or (iii) The methodology under which case... legal papers. (5) Home investigations. (6) Providing transportation. (7) Administering foster care... by another federally-funded program, the State must use cost allocation methodologies, consistent...
Code of Federal Regulations, 2014 CFR
2014-07-01
... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...
Management of health care expenditure by soft computing methodology
NASA Astrophysics Data System (ADS)
Maksimović, Goran; Jović, Srđan; Jovanović, Radomir; Aničić, Obrad
2017-01-01
In this study was managed the health care expenditure by soft computing methodology. The main goal was to predict the gross domestic product (GDP) according to several factors of health care expenditure. Soft computing methodologies were applied since GDP prediction is very complex task. The performances of the proposed predictors were confirmed with the simulation results. According to the results, support vector regression (SVR) has better prediction accuracy compared to other soft computing methodologies. The soft computing methods benefit from the soft computing capabilities of global optimization in order to avoid local minimum issues.
NASA Astrophysics Data System (ADS)
Toropov, V. S.
2018-05-01
The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Byoung Yoon; Roberts, Barry L.
The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.« less
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach.
Bai, Libiao; Wang, Hailing; Huang, Ning; Du, Qiang; Huang, Youdan
2018-06-23
The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP) based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP) environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP)-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.
An Overview of Total Quality Management (TQM) practice in Construction Sector
NASA Astrophysics Data System (ADS)
Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed
2018-04-01
In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.
Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue
2016-05-01
A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.
Philosophical and Methodological Beliefs of Instructional Design Faculty and Professionals
ERIC Educational Resources Information Center
Sheehan, Michael D.; Johnson, R. Burke
2012-01-01
The purpose of this research was to probe the philosophical beliefs of instructional designers using sound philosophical constructs and quantitative data collection and analysis. We investigated the philosophical and methodological beliefs of instructional designers, including 152 instructional design faculty members and 118 non-faculty…
Consensus on surgical aspects of managing osteomyelitis in the diabetic foot
Allahabadi, Sachin; Haroun, Kareem B.; Musher, Daniel M.; Lipsky, Benjamin A.; Barshes, Neal R.
2016-01-01
Background The aim of this study was to develop consensus statements that may help share or even establish ‘best practices’ in the surgical aspects of managing diabetic foot osteomyelitis (DFO) that can be applied in appropriate clinical situations pending the publication of more high-quality data. Methods We asked 14 panelists with expertise in DFO management to participate. Delphi methodology was used to develop consensus statements. First, a questionnaire elicited practices and beliefs concerning various aspects of the surgical management of DFO. Thereafter, we constructed 63 statements for analysis and, using a nine-point Likert scale, asked the panelists to indicate the extent to which they agreed or disagreed with the statements. We defined consensus as a mean score of greater than 7.0. Results The panelists reached consensus on 38 items after three rounds. Among these, seven provide guidance on initial diagnosis of DFO and selection of patients for surgical management. Another 15 statements provide guidance on specific aspects of operative management, including the timing of operations and the type of specimens to be obtained. Ten statements provide guidance on postoperative management, including wound closure and offloading, and six statements summarize the panelists’ agreement on general principles for surgical management of DFO. Conclusions Consensus statement on the perioperative management of DFO were formed with an expert panel comprised of a variety of surgical specialties. We believe these statements may serve as ‘best practice’ guidelines until properly performed studies provide more robust evidence to support or refute specific surgical management steps in DFO. PMID:27414481
NASA Astrophysics Data System (ADS)
Qin, Minwu
2018-05-01
With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.
ERIC Educational Resources Information Center
Sikaliuk, Anzhela
2014-01-01
The role and importance of situational methodology as one of the pedagogical tools of influence on the formation of socio-ethical values of future managers in higher schools of Ukraine and Germany have been theoretically substantiated. The possibilities of situational methodology influence on the formation of socio-ethical values of…
Safety risk assessment for vertical concrete formwork activities in civil engineering construction.
López-Arquillos, Antonio; Rubio-Romero, Juan Carlos; Gibb, Alistair G F; Gambatese, John A
2014-01-01
The construction sector has one of the worst occupational health and safety records in Europe. Of all construction tasks, formwork activities are associated with a high frequency of accidents and injuries. This paper presents an investigation of the activities and related safety risks present in vertical formwork for in-situ concrete construction in the civil engineering sector. Using the methodology of staticized groups, twelve activities and ten safety risks were identified and validated by experts. Every safety risk identified in this manner was quantified for each activity using binary methodology according to the frequency and severity scales developed in prior research. A panel of experts was selected according to the relevant literature on staticized groups. The results obtained show that the activities with the highest risk in vertical formwork tasks are: Plumbing and leveling of forms, cutting of material, handling materials with cranes, and climbing or descending ladders. The most dangerous health and safety risks detected were falls from height, cutting and overexertion. The research findings provide construction practitioners with further evidence of the hazardous activities associated with concrete formwork construction and a starting point for targeting worker health and safety programmes.
Sustainability assessment in forest management based on individual preferences.
Martín-Fernández, Susana; Martinez-Falero, Eugenio
2018-01-15
This paper presents a methodology to elicit the preferences of any individual in the assessment of sustainable forest management at the stand level. The elicitation procedure was based on the comparison of the sustainability of pairs of forest locations. A sustainability map of the whole territory was obtained according to the individual's preferences. Three forest sustainability indicators were pre-calculated for each point in a study area in a Scots pine forest in the National Park of Sierra de Guadarrama in the Madrid Region in Spain to obtain the best management plan with the sustainability map. We followed a participatory process involving fifty people to assess the sustainability of the forest management and the methodology. The results highlighted the demand for conservative forest management, the usefulness of the methodology for managers, and the importance and necessity of incorporating stakeholders into forestry decision-making processes. Copyright © 2017 Elsevier Ltd. All rights reserved.
Raponi, Matteo; Damiani, Gianfranco; Vincenti, Sara; Wachocka, Malgorzata; Boninti, Federica; Bruno, Stefania; Quaranta, Gianluigi; Moscato, Umberto; Boccia, Stefania; Ficarra, Maria Giovanna; Specchia, Maria Lucia; Posteraro, Brunella; Berloco, Filippo; Celani, Fabrizio; Ricciardi, Walter; Laurenti, Patrizia
2014-01-01
The purpose of this research is to identify and formalize the Hospital Hygiene Service activities and products, evaluating them in a cost accounting management view. The ultimate aim, is to evaluate the financial adverse events prevention impact, in an Hospital Hygiene Service management. A three step methodology based on affinity grouping activities, was employed. This methodology led us to identify 4 action areas, with 23 related productive processes, and 86 available safety packages. Owing to this new methodology, we was able to implement a systematic evaluation of the furnished services.
10 CFR 436.12 - Life cycle cost methodology.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Life cycle cost methodology. 436.12 Section 436.12 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.12 Life cycle cost methodology. The life cycle cost methodology...
10 CFR 436.12 - Life cycle cost methodology.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Life cycle cost methodology. 436.12 Section 436.12 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.12 Life cycle cost methodology. The life cycle cost methodology...
10 CFR 436.12 - Life cycle cost methodology.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Life cycle cost methodology. 436.12 Section 436.12 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.12 Life cycle cost methodology. The life cycle cost methodology...
10 CFR 436.12 - Life cycle cost methodology.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Life cycle cost methodology. 436.12 Section 436.12 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.12 Life cycle cost methodology. The life cycle cost methodology...
10 CFR 436.12 - Life cycle cost methodology.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Life cycle cost methodology. 436.12 Section 436.12 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.12 Life cycle cost methodology. The life cycle cost methodology...
Human-Computer System Development Methodology for the Dialogue Management System.
1982-05-01
methodologies [HOSIJ78] are given below: I. The Michael Jackson Methodology [JACKM75] 2. The Warnier-Orr Methodolgy [HOSIJ78] 3. SADT (Structured...All the mentioned methodologies use top-down development strategy. The first two methodologies above ( Michael Jackson and Warnier-Orr) use data as the
A novel methodology for quantifying the performance of constructed bridges in cold regions.
DOT National Transportation Integrated Search
2014-04-01
This report presents a two-part research program examining the performance of constructed bridges in a : cold region, represented by those in the State of North Dakota, and the behavior of concrete members : strengthened with carbon fiber reinforced ...
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Toward A Theory of Construct Definition.
ERIC Educational Resources Information Center
Stenner, A. Jackson; And Others
1983-01-01
In an attempt to restore the symmetry and balance between the study of person and item variation, this paper presents a novel methodology construct specification equations, which allows one to ascertain from the lawful behavior of items what an instrument is measuring. (Author/PN)
Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties
NASA Astrophysics Data System (ADS)
Borgomeo, Edoardo; Hall, Jim W.; Fung, Fai; Watts, Glenn; Colquhoun, Keith; Lambert, Chris
2014-08-01
We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.
Kim, Myoung Soo
2012-08-01
The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…
NASA Astrophysics Data System (ADS)
Sara, Balazs; Antonini, Ernesto; Tarantini, Mario
2001-02-01
The VAMP project (VAlorization of building demolition Materials and Products, LIFE 98/ENV/IT/33) aims to build an effective and innovative information system to support decision making in selective demolition activity and to manage the valorization (recovery-reuse-recycling) of waste flows produced by the construction and demolition (C&D) sector. The VAMP information system will be tested it in Italy in some case studies of selective demolition. In this paper the proposed demolition-valorization system will be compared to the traditional one in a life cycle perspective, applying LCA methodology to highlight the advantages of VAMP system from an eco-sustainability point of view. Within the system boundaries demolition processes, transport of demolition wastes and its recovery/treatment or disposal in landfill were included. Processes avoided due to reuse-recycling activities, such as extraction of natural resources and manufacture of building materials and components, were considered too. In this paper data collection procedure applied in inventory and impact assessment phases and a general overview about data availability for LCA studies in this sector are presented. Results of application of VAMP methodology to a case study are discussed and compared with a simulated traditional demolition of the same building. Environmental advantages of VAMP demolition-valorization system are demonstrated quantitatively emphasizing the special importance of reuse of building components with high demand of energy for manufacture.
NASA Astrophysics Data System (ADS)
Wernet, A. K.; Beighley, R. E.
2006-12-01
Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory results are presented.
Cascón-Pereira, Rosalía; Valverde, Mireia
2014-01-01
To understand the process by which clinician managers construct their professional identities and develop their attitudes toward managing. A qualitative study was performed, based on grounded theory, through in-depth interviews with 20 clinician managers selected through theoretical sampling in two public hospitals of Catalonia (Spain), participant observation, and documentation. Clinician managers' role meanings are constructed by comparing their roles with those of senior managers and clinicians. In this process, clinician managers seek to differentiate themselves from senior managers through the meanings constructed. In particular, they use proximity with reality and clinical knowledge as the main sources of differentiation. This study sheds light on why clinician managers develop adverse attitudes to managing and why they define themselves as clinicians rather than as managers. The explanation lies in the construction of the meanings they assign to managing as the basis of their attitudes to this role and professional identity. These findings have some practical implications for healthcare management. Copyright © 2014. Published by Elsevier Espana.
ERIC Educational Resources Information Center
Abbott, James F.
This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…
Examining emotional expressions in discourse: methodological considerations
NASA Astrophysics Data System (ADS)
Hufnagel, Elizabeth; Kelly, Gregory J.
2017-10-01
This methodological paper presents an approach for examining emotional expressions through discourse analysis and ethnographic methods. Drawing on trends in the current literature in science education, we briefly explain the importance of emotions in science education and examine the current research methodologies used in interactional emotion studies. We put forth and substantiate a methodological approach that attends to the interactional, contextual, intertextual, and consequential aspects of emotional expressions. By examining emotional expressions in the discourse in which they are constructed, emotional expressions are identified through semantics, contextualization, and linguistic features. These features make salient four dimensions of emotional expressions: aboutness, frequency, type, and ownership. Drawing on data from a large empirical study of pre-service elementary teachers' emotional expressions about climate change in a science course, we provide illustrative examples to describe what counts as emotional expressions in situ. In doing so we explain how our approach makes salient the nuanced nature of such expressions as well as the broader discourse in which they are constructed and the implications for researching emotional expressions in science education discourse. We suggest reasons why this discourse orientated research methodology can contribute to the interactional study of emotions in science education contexts.
The "Push-Pull" Approach to Fast-Track Management Development: A Case Study in Scientific Publishing
ERIC Educational Resources Information Center
Fojt, Martin; Parkinson, Stephen; Peters, John; Sandelands, Eric
2008-01-01
Purpose: The purpose of this paper is to explore how a medium sized business has addressed what it has termed a "push-pull" method of management and organization development, based around an action learning approach. Design/methodology/approach: The paper sets out a methodology that other SMEs might look to replicate in their management and…
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2013 CFR
2013-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2014 CFR
2014-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2011 CFR
2011-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2012 CFR
2012-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
Extension of Companion Modeling Using Classification Learning
NASA Astrophysics Data System (ADS)
Torii, Daisuke; Bousquet, François; Ishida, Toru
Companion Modeling is a methodology of refining initial models for understanding reality through a role-playing game (RPG) and a multiagent simulation. In this research, we propose a novel agent model construction methodology in which classification learning is applied to the RPG log data in Companion Modeling. This methodology enables a systematic model construction that handles multi-parameters, independent of the modelers ability. There are three problems in applying classification learning to the RPG log data: 1) It is difficult to gather enough data for the number of features because the cost of gathering data is high. 2) Noise data can affect the learning results because the amount of data may be insufficient. 3) The learning results should be explained as a human decision making model and should be recognized by the expert as being the result that reflects reality. We realized an agent model construction system using the following two approaches: 1) Using a feature selction method, the feature subset that has the best prediction accuracy is identified. In this process, the important features chosen by the expert are always included. 2) The expert eliminates irrelevant features from the learning results after evaluating the learning model through a visualization of the results. Finally, using the RPG log data from the Companion Modeling of agricultural economics in northeastern Thailand, we confirm the capability of this methodology.
NASA Astrophysics Data System (ADS)
Falacinski, Paweł; Szarek, Łukasz
2016-06-01
In Poland, in recent years, there has been a rapid accumulation of sewage sludge - a by-product in the treatment of urban wastewater. This has come about as a result of infrastructure renewal, specifically, the construction of modern sewage treatment plants. The more stringent regulations and strategic goals adopted for modern sewage management have necessitated the application of modern engineering methodology for the disposal of sewage sludge. One approach is incineration. As a consequence, the amount of fly ash resulting from the thermal treatment of municipal sewage sludge has grown significantly. Hence, intensive work is in progress for environmentally safe management of this type of waste. The aim of the experiment was to evaluate the possibility of using the fly ash that results from municipal sewage sludge thermal treatment (SSTT) as an additive to hardening slurries. This type of hardening slurry with various types of additives, e.g. coal combustion products, is used in the construction of cut-off walls in hydraulic structures. The article presents the technological and functional parameters of hardening slurries with an addition of fly ash obtained by SSTT. Moreover, the usefulness of these slurries is analysed on the basis of their basic properties, i.e. density, contractual viscosity, water separation, structural strength, volumetric density, hydraulic conductivity, compressive and tensile strength. The mandated requirements for slurries employed in the construction of cut-off walls in flood embankments are listed as a usefulness criteria. The article presents the potential uses of fly ash from SSTT in hardening slurry technology. It also suggests directions for further research to fully identify other potential uses of this by-product in this field.
Estimation of building-related construction and demolition waste in Shanghai.
Ding, Tao; Xiao, Jianzhuang
2014-11-01
One methodology is proposed to estimate the quantification and composition of building-related construction and demolition (C&D) waste in a fast developing region like Shanghai, PR China. The varieties of structure types and building waste intensities due to the requirement of progressive building design and structure codes in different decades are considered in this regional C&D waste estimation study. It is concluded that approximately 13.71 million tons of C&D waste was generated in 2012 in Shanghai, of which more than 80% of this C&D waste was concrete, bricks and blocks. Analysis from this study can be applied to facilitate C&D waste governors and researchers the duty of formulating precise policies and specifications. As a matter of fact, at least a half of the enormous amount of C&D waste could be recycled if implementing proper recycling technologies and measures. The appropriate managements would be economically and environmentally beneficial to Shanghai where the per capita per year output of C&D waste has been as high as 842 kg in 2010. Copyright © 2014 Elsevier Ltd. All rights reserved.
Understanding AIDS: historical interpretations and the limits of biomedical individualism.
Fee, E; Krieger, N
1993-01-01
The popular and scientific understanding of acquired immunodeficiency syndrome (AIDS) in the United States has been shaped by successive historical constructions or paradigms of disease. In the first paradigm, AIDS was conceived of as a "gay plague," by analogy with the sudden, devastating epidemics of the past. In the second, AIDS was normalized as a chronic disease to be managed medically over the long term. By examining and extending critiques of both paradigms, it is possible to discern the emergence of an alternative paradigm of AIDS as a collective chronic infectious disease and persistent pandemic. Each of these constructions of AIDS incorporates distinct views of the etiology, prevention, pathology, and treatment of disease; each tacitly promotes different conceptions of the proper allocation of individual and social responsibility for AIDS. This paper focuses on individualistic vs collective, and biomedical vs social and historical, understandings of disease. It analyzes the use of individualism as methodology and as ideology, criticizes some basic assumptions of the biomedical model, and discusses alternative strategies for scientific research, health policy, and disease prevention. Images p1478-a p1480-a p1482-a PMID:8214245
Methodological Issues in Measuring the Development of Character
ERIC Educational Resources Information Center
Card, Noel A.
2017-01-01
In this article I provide an overview of the methodological issues involved in measuring constructs relevant to character development and education. I begin with a nontechnical overview of the 3 fundamental psychometric properties of measurement: reliability, validity, and equivalence. Developing and evaluating measures to ensure evidence of all 3…
Methodologies in African-American Historical Research: The Model and the Evolving Paradig.
ERIC Educational Resources Information Center
Kinshasa, Kwando M.
1987-01-01
Historical research has more to do with the present than with the past, as methodological constructs tend to be influenced by the contemporary needs of society. The practice and significance of historical research is determined by the researcher, his or her audience, and the political situation. (BJV)
Interpreting Qualitative Data: A Methodological Inquiry.
ERIC Educational Resources Information Center
Newman, Isadore; MacDonald, Suzanne
The methodology of interpretation of qualitative data was explored using a grounded theory approach to the synthesis of data, examining the construction of categories in particular. The focus is on ways of organizing data and attaching meaning, as research problems embedded in cultural context are explored. A qualitative research training task…
Becoming an Entrepreneur: Researching the Role of Mentors in Identity Construction
ERIC Educational Resources Information Center
Rigg, Clare; O'Dwyer, Breda
2012-01-01
Purpose: The purpose of this paper is to provide a theoretical discussion of a developing epistemology and methodology for a qualitative study of participants of enterprise education in south-west Ireland, run collaboratively between third level academics, a regional development agency, and entrepreneurs. Design/methodology/approach: The…
Resisting Participation: Critiquing Participatory Research Methodologies with Young People
ERIC Educational Resources Information Center
Fox, Rachael
2013-01-01
Participatory methodologies are increasingly employed in research with young people. These practices stem from a desire to reduce problematic distributions of power in research and to construct knowledge with young people rather than for them. This paper examines research conducted with a small group of young people experiencing exclusion from…
Ranciere and the Poetics of the Social Sciences
ERIC Educational Resources Information Center
Pelletier, Caroline
2009-01-01
This article reviews the significance of Jacques Ranciere's work for methodological debates in the social sciences, and education specifically. It explores the implications of constructing research as an aesthetic, rather than primarily a methodological, endeavour. What is at stake in this distinction is the means by which research intervenes in…
Measuring Youth Development: A Nonparametric Cross-Country "Youth Welfare Index"
ERIC Educational Resources Information Center
Chaaban, Jad M.
2009-01-01
This paper develops an empirical methodology for the construction of a synthetic multi-dimensional cross-country comparison of the performance of governments around the world in improving the livelihood of their younger population. The devised "Youth Welfare Index" is based on the nonparametric Data Envelopment Analysis (DEA) methodology and…
Code of Federal Regulations, 2014 CFR
2014-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
Methodology of management of dredging operations II. Applications.
Junqua, G; Abriak, N E; Gregoire, P; Dubois, V; Mac Farlane, F; Damidot, D
2006-04-01
This paper presents the new methodology of management of dredging operations. Derived partly from existing methodologies (OECD, PNUE, AIPCN), it aims to be more comprehensive, mixing the qualities and the complementarities of previous methodologies. The application of the methodology has been carried out on the site of the Port of Dunkirk (FRANCE). Thus, a characterization of the sediments of this site has allowed a zoning of the Port to be established in to zones of probable homogeneity of sediments. Moreover, sources of pollution have been identified, with an aim of prevention. Ways of waste improvement have also been developed, to answer regional needs, from a point of view of competitive and territorial intelligence. Their development has required a mutualisation of resources between professionals, research centres and local communities, according to principles of industrial ecology. Lastly, a tool of MultiCriteria Decision-Making Aid (M.C.D.M.A.) has been used to determine the most relevant scenario (or alternative, or action) for a dredging operation intended by the Port of Dunkirk. These applications have confirmed the relevance of this methodology for the management of dredging operations.
NASA Technical Reports Server (NTRS)
Arnold, Steven M.; Goldberg, Robert K.; Lerch, Bradley A.; Saleeb, Atef F.
2009-01-01
Herein a general, multimechanism, physics-based viscoelastoplastic model is presented in the context of an integrated diagnosis and prognosis methodology which is proposed for structural health monitoring, with particular applicability to gas turbine engine structures. In this methodology, diagnostics and prognostics will be linked through state awareness variable(s). Key technologies which comprise the proposed integrated approach include (1) diagnostic/detection methodology, (2) prognosis/lifing methodology, (3) diagnostic/prognosis linkage, (4) experimental validation, and (5) material data information management system. A specific prognosis lifing methodology, experimental characterization and validation and data information management are the focal point of current activities being pursued within this integrated approach. The prognostic lifing methodology is based on an advanced multimechanism viscoelastoplastic model which accounts for both stiffness and/or strength reduction damage variables. Methods to characterize both the reversible and irreversible portions of the model are discussed. Once the multiscale model is validated the intent is to link it to appropriate diagnostic methods to provide a full-featured structural health monitoring system.
NASA Technical Reports Server (NTRS)
Arnold, Steven M.; Goldberg, Robert K.; Lerch, Bradley A.; Saleeb, Atef F.
2009-01-01
Herein a general, multimechanism, physics-based viscoelastoplastic model is presented in the context of an integrated diagnosis and prognosis methodology which is proposed for structural health monitoring, with particular applicability to gas turbine engine structures. In this methodology, diagnostics and prognostics will be linked through state awareness variable(s). Key technologies which comprise the proposed integrated approach include 1) diagnostic/detection methodology, 2) prognosis/lifing methodology, 3) diagnostic/prognosis linkage, 4) experimental validation and 5) material data information management system. A specific prognosis lifing methodology, experimental characterization and validation and data information management are the focal point of current activities being pursued within this integrated approach. The prognostic lifing methodology is based on an advanced multi-mechanism viscoelastoplastic model which accounts for both stiffness and/or strength reduction damage variables. Methods to characterize both the reversible and irreversible portions of the model are discussed. Once the multiscale model is validated the intent is to link it to appropriate diagnostic methods to provide a full-featured structural health monitoring system.
NASA Astrophysics Data System (ADS)
Sudmeier-Rieux, Karen; Dubois, Jerome; Jaboyedoff, Michel
2010-05-01
This paper describes a methodology for assessing and quantifying vulnerability and resilience of mountain communities in Eastern Nepal increasingly affected by landslides and flooding. We are interested in improving our understanding of the complex interactions between land use, landslides and multiple dimensions of risk, vulnerability and resilience to better target risk management strategies. Our approach is based on assessing underlying social, ecological and physical factors that cause vulnerability and on the other hand, those resources and capacities that increase resilience. Increasing resilience to disasters is frequently used by NGOs, governments and donors as the main goal of disaster risk reduction policies and practices. If we are to increase resilience to disasters, we need better guidance and tools for defining, assessing and monitoring its parameters. To do so, we are establishing a methodology for quantifying and mapping an index of resilience to compare resilience factors between households and communities based on interdisciplinary research methods: remote sensing, GIS, qualitative and quantitative risk assessments, participatory risk mapping, household questionnaires and focus groups discussions. Our study applied this methodology to several communities in Eastern Nepal where small, frequent landslides are greatly affecting rural lives and livelihoods. These landslides are not captured by headlines or official statistics but are examples of cumulative, hidden disasters, which are impacting everyday life and rural poverty in the Himalayas. Based on experience, marginalized populations are often aware of the physical risks and the limitations of their land. However, they continue to live in dangerous places out of necessity and for the economic or infrastructure opportunities offered. We compare two communities in Nepal, both affected by landslides but with different land use, migration patterns, education levels, social networks, risk reduction and coping strategies. Stone quarrying and road construction, offering economic opportunities, are aggravating landslide problems. The villages are faced with a delicate balance between economic development and physical risk in this fragile terrain. Based on our comparison, we discern which factors contribute to vulnerability and resilience, while drawing conclusions about the limitations of these concepts for developing risk management strategies. Our goal is to keep this method relatively simple, low cost and useful to decision-makers and communities for managing and designing integrated development and risk management approaches under changing climate conditions.
[Scientific and methodologic approaches to evaluating medical management for workers of Kazakhstan].
2012-01-01
The article covers topical problems of workers' health preservation. Complex research results enabled to evaluate and analyze occupational risks in leading industries of Kazakhstan, for improving scientific and methodologic approaches to medical management for workers subjected to hazardous conditions.
17 CFR 39.5 - Review of swaps for Commission determination on clearing requirement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... publicly; (vi) Risk management procedures, including measurement and monitoring of credit exposures, initial and variation margin methodology, methodologies for stress testing and back testing, settlement procedures, and default management procedures; (vii) Applicable rules, manuals, policies, or procedures...
SOCIOECONOMIC ANALYSIS OF HAZARDOUS WASTE MANAGEMENT ALTERNATIVES: METHOLOLOGY AND DEMONSTRATION
A methodology for analyzing economic and social effects of alternatives in hazardous waste management is presented and demonstrated. The approach includes the use of environmental threat scenarios and evaluation of effects on and responses by parties-at-interest. The methodology ...
Force 2025 and Beyond Strategic Force Design Analytic Model
2017-01-12
depiction of the core ideas of our force design model. Figure 1: Description of Force Design Model Figure 2 shows an overview of our methodology ...the F2025B Force Design Analytic Model research conducted by TRAC- MTRY and the Naval Postgraduate School. Our research develops a methodology for...designs. We describe a data development methodology that characterizes the data required to construct a force design model using our approach. We
DOT National Transportation Integrated Search
2014-04-01
This report presents a two-part research program examining the performance of constructed : bridges in a cold region, represented by those in the State of North Dakota, and the behavior of : concrete members strengthened with carbon fiber reinforced ...
Re-Presenting Women and Leadership: A Methodological Journey
ERIC Educational Resources Information Center
Wilkinson, Jane; Blackmore, Jill
2008-01-01
Research on women's leadership has tended to focus upon detailed micro studies of individual women's identity formation or, alternatively, to conduct macro studies of its broader discursive constructions within society. Both approaches, although providing helpful understandings of the issues surrounding constructions of women's leadership, are…
Forsythe, Alex; Street, Nichola; Helmy, Mai
2017-08-01
Differences between norm ratings collected when participants are asked to consider more than one picture characteristic are contrasted with the traditional methodological approaches of collecting ratings separately for image constructs. We present data that suggest that reporting normative data, based on methodological procedures that ask participants to consider multiple image constructs simultaneously, could potentially confounded norm data. We provide data for two new image constructs, beauty and the extent to which participants encountered the stimuli in their everyday lives. Analysis of this data suggests that familiarity and encounter are tapping different image constructs. The extent to which an observer encounters an object predicts human judgments of visual complexity. Encountering an image was also found to be an important predictor of beauty, but familiarity with that image was not. Taken together, these results suggest that continuing to collect complexity measures from human judgments is a pointless exercise. Automated measures are more reliable and valid measures, which are demonstrated here as predicting human preferences.
NASA Astrophysics Data System (ADS)
Avilova, I. P.; Krutilova, M. O.
2018-01-01
Economic growth is the main determinant of the trend to increased greenhouse gas (GHG) emission. Therefore, the reduction of emission and stabilization of GHG levels in the atmosphere become an urgent task to avoid the worst predicted consequences of climate change. GHG emissions in construction industry take a significant part of industrial GHG emission and are expected to consistently increase. The problem could be successfully solved with a help of both economical and organizational restrictions, based on enhanced algorithms of calculation and amercement of environmental harm in building industry. This study aims to quantify of GHG emission caused by different constructive schemes of RC framework in concrete casting. The result shows that proposed methodology allows to make a comparative analysis of alternative projects in residential housing, taking into account an environmental damage, caused by construction process. The study was carried out in the framework of the Program of flagship university development on the base of Belgorod State Technological University named after V.G. Shoukhov
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blaylock, B.P.; Legg, J.; Travis, C.C.
1995-06-01
This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments.
ERIC Educational Resources Information Center
Schmitz, Kurt W.
2013-01-01
Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…
DOT National Transportation Integrated Search
2012-09-01
This report summarizes the results of a 13-month effort by CodeRed Business Solutions (CRBS) to consider how urban rail transit agencies can leverage data within their maintenance management systems to build asset inventories for higher-level analysi...
Using Sphinx to Improve Onion Routing Circuit Construction
NASA Astrophysics Data System (ADS)
Kate, Aniket; Goldberg, Ian
This paper presents compact message formats for onion routing circuit construction using the Sphinx methodology developed for mixes. We significantly compress the circuit construction messages for three onion routing protocols that have emerged as enhancements to the Tor anonymizing network; namely, Tor with predistributed Diffie-Hellman values, pairing-based onion routing, and certificateless onion routing. Our new circuit constructions are also secure in the universal composability framework, a property that was missing from the original constructions. Further, we compare the performance of our schemes with their older counterparts as well as with each other.
Assessment of Parturition with Cervical Light-Induced Fluorescence and Uterine Electromyography
Lucovnik, Miha; Kuon, Ruben J.; Garfield, Robert E.
2013-01-01
Parturition involves increasing compliance (ripening) of the uterine cervix and activation of the myometrium. These processes take place in a different time frame. Softening and shortening of the cervix starts in midpregnancy, while myometrial activation occurs relatively close to delivery. Methods currently available to clinicians to assess cervical and myometrial changes are subjective and inaccurate, which often causes misjudgments with potentially adverse consequences. The inability to reliably diagnose true preterm labor leads to unnecessary treatments, missed opportunities to improve neonatal outcome, and inherently biased research of treatments. At term, the likelihood of cesarean delivery depends on labor management, which in turn depends on accurate assessments of cervical change and myometrial contractility. Studies from our group and others show that noninvasive measurements of light-induced fluorescence (LIF) of cervical collagen and uterine electromyography (EMG) objectively detect changes in the composition of the cervix and myometrial preparedness to labor and are more reliable than clinical observations alone. We present a conceptual model of parturition constructed on cervical LIF and uterine EMG studies. We also explore how these methodologies could be helpful with managing patients experiencing preterm contractions and with optimizing labor management protocols aimed to reduce cesarean section. PMID:24187578
Fowler, K. R.; Jenkins, E.W.; Parno, M.; Chrispell, J.C.; Colón, A. I.; Hanson, Randall T.
2016-01-01
The development of appropriate water management strategies requires, in part, a methodology for quantifying and evaluating the impact of water policy decisions on regional stakeholders. In this work, we describe the framework we are developing to enhance the body of resources available to policy makers, farmers, and other community members in their e orts to understand, quantify, and assess the often competing objectives water consumers have with respect to usage. The foundation for the framework is the construction of a simulation-based optimization software tool using two existing software packages. In particular, we couple a robust optimization software suite (DAKOTA) with the USGS MF-OWHM water management simulation tool to provide a flexible software environment that will enable the evaluation of one or multiple (possibly competing) user-defined (or stakeholder) objectives. We introduce the individual software components and outline the communication strategy we defined for the coupled development. We present numerical results for case studies related to crop portfolio management with several defined objectives. The objectives are not optimally satisfied for any single user class, demonstrating the capability of the software tool to aid in the evaluation of a variety of competing interests.
Assessing wildlife value orientations in China: an exploration of the concepts and methodology
Sharon Xiangyou Shen; Harry Zinn; Alex Yasong Wang
2007-01-01
The wildlife value orientation (WVO) construct has been used to describe deeply-held beliefs about how humans should relate to wildlife. As part of a larger effort to test the usefulness of the WVO construct across cultures, we conducted pilot testing of the construct in China. Sixteen mixed-method interviews were conducted in five cities/towns in China. Participants...
Erosion Prediction Analysis and Landuse Planning in Gunggung Watershed, Bali, Indonesia
NASA Astrophysics Data System (ADS)
Trigunasih, N. M.; Kusmawati, T.; Yuli Lestari, N. W.
2018-02-01
The purpose of this research is to predict the erosion that occurs in Gunggung watershed and sustainable landuse management plan. This research used the USLE (Universal Soil Loss Equation) methodology. The method used observation / field survey and soil analysis at the Soil Laboratory of Faculty of Agriculture, Udayana University. This research is divided into 5 stages, (1) land unit determination, (2) Field observation and soil sampling, (3) Laboratory analysis and data collection, (4) Prediction of erosion using USLE (Universal Soil Loss Equation) method, (5) The permissible erosion determination (EDP) then (6) determines the level of erosion hazard based on the depth of the soil, as well as the soil conservation plan if the erosion is greater than the allowed erosion, and (7) determining landuse management plan for sustainable agriculture. Erosion which value is smaller than soil loss tolerance can be exploited in a sustainable manner, while erosion exceeds allowable erosion will be conservation measures. Conservation action is the improvement of vegetation and land management. Land management like improvements the terrace, addition of organic matter, increase plant density, planting ground cover and planting layered header system will increase the land capability classes. Land use recommended after management is mixed plantation high density with forest plants, mix plantation high density with patio bench construction, seasonal cultivation and perennial crops, cultivation of perennial crops and cultivation of seasonal crops.
Implications of construction method and spatial scale on measures of the built environment.
Strominger, Julie; Anthopolos, Rebecca; Miranda, Marie Lynn
2016-04-28
Research surrounding the built environment (BE) and health has resulted in inconsistent findings. Experts have identified the need to examine methodological choices, such as development and testing of BE indices at varying spatial scales. We sought to examine the impact of construction method and spatial scale on seven measures of the BE using data collected at two time points. The Children's Environmental Health Initiative conducted parcel-level assessments of 57 BE variables in Durham, NC (parcel N = 30,319). Based on a priori defined variable groupings, we constructed seven mutually exclusive BE domains (housing damage, property disorder, territoriality, vacancy, public nuisances, crime, and tenancy). Domain-based indices were developed according to four different index construction methods that differentially account for number of parcels and parcel area. Indices were constructed at the census block level and two alternative spatial scales that better depict the larger neighborhood context experienced by local residents: the primary adjacency community and secondary adjacency community. Spearman's rank correlation was used to assess if indices and relationships among indices were preserved across methods. Territoriality, public nuisances, and tenancy were weakly to moderately preserved across methods at the block level while all other indices were well preserved. Except for the relationships between public nuisances and crime or tenancy, and crime and housing damage or territoriality, relationships among indices were poorly preserved across methods. The number of indices affected by construction method increased as spatial scale increased, while the impact of construction method on relationships among indices varied according to spatial scale. We found that the impact of construction method on BE measures was index and spatial scale specific. Operationalizing and developing BE measures using alternative methods at varying spatial scales before connecting to health outcomes allows researchers to better understand how methodological decisions may affect associations between health outcomes and BE measures. To ensure that associations between the BE and health outcomes are not artifacts of methodological decisions, researchers would be well-advised to conduct sensitivity analysis using different construction methods. This approach may lead to more robust results regarding the BE and health outcomes.
Lenzenweger, Mark F.
2015-01-01
The concept of schizotypy represents a rich and complex psychopathology construct. Furthermore, the construct implies a theoretical model that has considerable utility as an organizing framework for the study of schizophrenia, schizophrenia-related psychopathology (eg, delusional disorder, psychosis-NOS (not otherwise specified), schizotypal, and paranoid personality disorder), and putative schizophrenia endophenotypes as suggested by Rado, Meehl, Gottesman, Lenzenweger, and others. The understanding (and misunderstanding) of the schizophrenia-related schizotypy model, particularly as regards clinical illness, as well as an alternative approach to the construct require vigilance in order to ensure the methodological approach continues to yield the fruit that it can in illuminating the pathogenesis of schizophrenia-related psychopathology. The articles in the Special Section in this issue of Schizophrenia Bulletin highlight methodological and theoretical issues that should be examined carefully. PMID:25810061
Evaluation in health: participatory methodology and involvement of municipal managers.
Almeida, Cristiane Andrea Locatelli de; Tanaka, Oswaldo Yoshimi
2016-08-04
To analyze scopes and limits of the use of participatory methodology of evaluation with municipal health managers and administrators. Qualitative research with health policymakers and managers of the Comissão Intergestores Regional (CIR - Regional Interagency Commission) of a health region of the state of Sao Paulo in Brazil. Representatives from seven member cities participated in seven workshops facilitated by the researchers, with the aim of assessing a specific problem of the care line, which would be used as a tracer of the system integrality. The analysis of the collected empirical material was based on the hermeneutic-dialectic methodology and aimed at the evaluation of the applied participatory methodology, according to its capacity of promoting a process of assessment capable to be used as a support for municipal management. With the participatory approach of evaluation, we were able to promote in-depth discussions with the group, especially related to the construction of integral care and to the inclusion of the user's perspective in decision-making, linked to the search for solution to concrete problems of managers. By joint exploration, the possibility of using data from electronic information systems was opened, as well as information coming directly from the users of the services, to enhance discussions and negotiations between partners. The participants were disbelievers of the replication potential of this type of evaluation without the direct monitoring of the academy, given the difficulty of organizing the process in everyday life, already taken by emergency and political issues. Evaluations of programs and services carried out within the Regional Interagency Commission, starting from the local interest and facilitating the involvement of its members by the use of participatory methodologies, can contribute to the construction of integral care. To the extent that the act of evaluating stay invested with greater significance to the local actors, its involvement with the evaluations at the federal level can also be stimulated. Analisar alcances e limites do uso de metodologia participativa de avaliação junto a gestores e gerentes municipais de saúde. Pesquisa qualitativa com gestores e gerentes de saúde da Comissão Intergestores Regional de uma região de saúde do estado de São Paulo. Representantes de sete municípios membros participaram de sete oficinas facilitadas pelos pesquisadores, com o objetivo de avaliar um problema específico da linha de cuidados sob a perspectiva da integralidade. A análise do material empírico coletado baseou-se na metodologia hermenêutica-dialética e visou a avaliação da metodologia participativa aplicada, segundo sua capacidade de promover um processo de avaliação passível de ser utilizado como suporte à gestão municipal. Com a abordagem participativa de avaliação, foi possível promover debates em profundidade com o grupo, principalmente relacionados à construção da integralidade da atenção e à inclusão da perspectiva do usuário na tomada de decisão, de forma vinculada à busca de solução para problemas concretos dos gestores. Mediante a exploração conjunta, foi aberta a possibilidade de utilização de dados advindos dos sistemas eletrônicos de informação, bem como de informações advindas diretamente dos usuários dos serviços, para enriquecer debates e negociações entre parceiros. Os participantes se mostraram descrentes do potencial de replicação deste tipo de avaliação sem o acompanhamento direto da academia, dada a dificuldade de organização do processo no cotidiano, já tomado por questões emergenciais e políticas. Avaliações de programas e serviços realizadas no âmbito da Comissão Intergestores Regional, partindo do interesse local e facilitando o envolvimento de seus membros pelo uso de metodologias participativas, podem contribuir para a construção da integralidade do cuidado. Na medida em que o ato de avaliar fique investido de maior significado para os atores locais, seu envolvimento com as avaliações em nível federal poderá ser também estimulado.
[Talking about the discipline construction and development of burn from five ideas].
Guo, G H
2018-03-20
Discipline construction is an important aspect of hospital modernization management and construction. The level of medical treatment, education, and scientific research could be assured and improved through discipline construction, which could speed up the talent training, promote science and technology innovation, and realize the sustainable development of hospital. At present, most of the hospital management models adopt the two ranks of the hospital and department. The manager of a department must grasp medical treatment, education, scientific research, and discipline construction steadily. The author talks about the discipline construction and development of burn from " five ideas" for the readers.
Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua
2013-01-01
Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176
Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua
2013-12-01
The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.
ERIC Educational Resources Information Center
Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.
2002-01-01
Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…
Estimation of construction waste generation and management in Thailand.
Kofoworola, Oyeshola Femi; Gheewala, Shabbir H
2009-02-01
This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.
10 CFR 436.14 - Methodological assumptions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Methodological assumptions. 436.14 Section 436.14 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.14 Methodological assumptions. (a) Each Federal Agency shall...
10 CFR 436.14 - Methodological assumptions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Methodological assumptions. 436.14 Section 436.14 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.14 Methodological assumptions. (a) Each Federal Agency shall...
10 CFR 436.14 - Methodological assumptions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Methodological assumptions. 436.14 Section 436.14 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.14 Methodological assumptions. (a) Each Federal Agency shall...
10 CFR 436.14 - Methodological assumptions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Methodological assumptions. 436.14 Section 436.14 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.14 Methodological assumptions. (a) Each Federal Agency shall...
10 CFR 436.14 - Methodological assumptions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Methodological assumptions. 436.14 Section 436.14 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methodology and Procedures for Life Cycle Cost Analyses § 436.14 Methodological assumptions. (a) Each Federal Agency shall...
Forensic Schedule Analysis of Construction Delay in Military Projects in the Middle East
This research performs forensic schedule analysis of delay factors that impacted recent large-scale military construction projects in the Middle East...The methodologies for analysis are adapted from the Professional Practice Guide to Forensic Schedule Analysis, particularly Method 3.7 Modeled
IMPROVED BIOSAND METHODOLOGIES FOR SUSTAINABLE CLEAN WATER SOLUTIONS IN NORTHERN HONDURAS
Both aspects of the project will lead to improved construction and operation of biosand filters in Honduras. The Hondurans who have taken on the challenge of constructing and distributing biosand filters appreciate the support and expertise that can be provided in imp...
Implicit Social Scaling from an Institutional Perspective
ERIC Educational Resources Information Center
D'Epifanio, Giulio
2009-01-01
The methodological question concerns constructing a cardinal social index, in order to assess performances of social agents, taking into account implicit political judgments. Based on the formal structure of a Choquet's expected utility, index construction demands quantification of levels of a meaningful ordinal indicator of overall performance.…
Focal Event, Contextualization, and Effective Communication in the Mathematics Classroom
ERIC Educational Resources Information Center
Nilsson, Per; Ryve, Andreas
2010-01-01
The aim of this article is to develop analytical tools for studying mathematical communication in collaborative activities. The theoretical construct of contextualization is elaborated methodologically in order to study diversity in individual thinking in relation to effective communication. The construct of contextualization highlights issues of…
An Analysis of Methods Used to Examine Gender Differences in Computer-Related Behavior.
ERIC Educational Resources Information Center
Kay, Robin
1992-01-01
Review of research investigating gender differences in computer-related behavior examines statistical and methodological flaws. Issues addressed include sample selection, sample size, scale development, scale quality, the use of univariate and multivariate analyses, regressional analysis, construct definition, construct testing, and the…
NASA Astrophysics Data System (ADS)
Lima, Eva; Nunes, João; Brilha, José; Calado, Helena
2013-04-01
The conservation of the geological heritage requires the support of appropriate policies, which should be the result of the integration of nature conservation, environmental and land-use planning, and environmental education perspectives. There are several papers about inventory methodologies for geological heritage and its scientific, educational and tourism uses (e.g. Cendrero, 2000, Lago et al., 2000; Brilha, 2005; Carcavilla et al., 2007). However, management methodologies for geological heritage are still poorly developed. They should be included in environmental and land-use planning and nature conservation policies, in order to support a holistic approach to natural heritage. This gap is explained by the fact that geoconservation is a new geoscience still needed of more basic scientific research, like any other geoscience (Henriques et al., 2011). It is necessary to establish protocols and mechanisms for the conservation and management of geological heritage. This is a complex type of management because it needs to address not only the fragile natural features to preserve but also legal, economic, cultural, educational and recreational aspects. In addition, a management methodology should ensure the geosites conservation, the local development and the dissemination of the geological heritage (Carcavilla et al., 2007). This work is part of a PhD project aiming to contribute to fill this gap that exists in the geoconservation domain, specifically in terms of establishing an appropriate methodology for the management of geological heritage, taking into account the natural diversity of geosites and the variety of natural and anthropic threats. The proposed methodology will be applied to the geological heritage of the Azores archipelago, which management acquires particular importance and urgency after the decision of the Regional Government to create the Azores Geopark and its application to the European and Global Geoparks Networks. Acknowledgment This work is part of a PhD research project funded by the Regional Fund for Science and Technology of the Azores Regional Government (PhD scholarship M3.1.2/F/033/201).
Task-level control for autonomous robots
NASA Technical Reports Server (NTRS)
Simmons, Reid
1994-01-01
Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.
Predictive Modeling of Risk Associated with Temperature Extremes over Continental US
NASA Astrophysics Data System (ADS)
Kravtsov, S.; Roebber, P.; Brazauskas, V.
2016-12-01
We build an extremely statistically accurate, essentially bias-free empirical emulator of atmospheric surface temperature and apply it for meteorological risk assessment over the domain of continental US. The resulting prediction scheme achieves an order-of-magnitude or larger gain of numerical efficiency compared with the schemes based on high-resolution dynamical atmospheric models, leading to unprecedented accuracy of the estimated risk distributions. The empirical model construction methodology is based on our earlier work, but is further modified to account for the influence of large-scale, global climate change on regional US weather and climate. The resulting estimates of the time-dependent, spatially extended probability of temperature extremes over the simulation period can be used as a risk management tool by insurance companies and regulatory governmental agencies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bleck, Daniela, E-mail: bleck.daniela@baua.bund.de; Wettberg, Wieland, E-mail: wettberg.wieland@baua.bund.de
2012-11-15
Waste management procedures in developing countries are associated with occupational safety and health risks. Gastro-intestinal infections, respiratory and skin diseases as well as muscular-skeletal problems and cutting injuries are commonly found among waste workers around the globe. In order to find efficient, sustainable solutions to reduce occupational risks of waste workers, a methodological risk assessment has to be performed and counteractive measures have to be developed according to an internationally acknowledged hierarchy. From a case study in Addis Ababa, Ethiopia suggestions for the transferral of collected household waste into roadside containers are given. With construction of ramps to dump collectedmore » household waste straight into roadside containers and an adaptation of pushcarts and collection procedures, the risk is tackled at the source.« less
A pollutant removal prediction tool for stormwater derived diffuse pollution.
Revitt, D Michael; Scholes, Lian; Ellis, J Bryan
2008-01-01
This report describes the development of a methodology to theoretically assess the effectiveness of structural BMPs with regard to their treatment of selected stormwater pollutants (metals, polyaromatic hydrocarbons and herbicides). The result is a prioritisation, in terms of pollutant removal efficiency, of 15 different BMPs which can inform stormwater managers and other stakeholders of the best available options for the treatment of urban runoff pollutants of particular environmental concern. Regardless of the selected pollutant, infiltration basins and sub-surface flow constructed wetlands are predicted to perform most efficiently with lagoons, porous asphalt and sedimentation tanks being the least effective systems for the removal of pollutants. The limitations of the approach in terms of the variabilities in BMP designs and applications are considered. (c) IWA Publishing 2008.
Load leveling on industrial refrigeration systems
NASA Astrophysics Data System (ADS)
Bierenbaum, H. S.; Kraus, A. D.
1982-01-01
A computer model was constructed of a brewery with a 2000 horsepower compressor/refrigeration system. The various conservation and load management options were simulated using the validated model. The savings available for implementing the most promising options were verified by trials in the brewery. Result show that an optimized methodology for implementing load leveling and energy conservation consisted of: (1) adjusting (or tuning) refrigeration systems controller variables to minimize unnecessary compressor starts, (2) The primary refrigeration system operating parameters, compressor suction pressure, and discharge pressure are carefully controlled (modulated) to satisfy product quality constraints (as well as in-process material cooling rates and temperature levels) and energy evaluating the energy cost savings associated with reject heat recovery, and (4) a decision is made to implement the reject heat recovery system based on a cost/benefits analysis.
Does Class Matter? Mentoring Small Businesses' Owner-Managers
ERIC Educational Resources Information Center
Greenbank, Paul
2006-01-01
Purpose: This paper examines the way social class influences the relationship between business mentors and small business owner-managers. Design/methodology/approach: The paper is based on the author's experience of mentoring businesses with The Prince's Trust. Three businesses were selected as cases. The methodological approach involved…
2013-04-01
and Integrated Risk Management Methodologies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e...supply chains, risk management with real options, and sustainability . [dnford@nps.edu] Thomas J. Housel—Housel specializes in valuing intellectual...maintenance services for the RDN. Damen Schelde has used an ILS since 2002 to manage the shipbuilding process from project initiation through the
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
Pant, Apourv; Rai, J P N
2018-04-15
Two phase bioreactor was constructed, designed and developed to evaluate the chlorpyrifos remediation. Six biotic and abiotic factors (substrate-loading rate, slurry phase pH, slurry phase dissolved oxygen (DO), soil water ratio, temperature and soil micro flora load) were evaluated by design of experimental (DOE) methodology employing Taguchi's orthogonal array (OA). The selected six factors were considered at two levels L-8 array (2^7, 15 experiments) in the experimental design. The optimum operating conditions obtained from the methodology showed enhanced chlorpyrifos degradation from 283.86µg/g to 955.364µg/g by overall 70.34% of enhancement. In the present study, with the help of few well defined experimental parameters a mathematical model was constructed to understand the complex bioremediation process and optimize the approximate parameters upto great accuracy. Copyright © 2017 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Schudde, Lauren
2018-01-01
To date, the theory of intersectionality has largely guided qualitative efforts in social science and education research. Translating the construct to new methodological approaches is inherently complex and challenging, but offers the possibility of breaking down silos that keep education researchers with similar interests--but different…
Qualitative Analysis of Comic Strip Culture: A Methodological Inquiry.
ERIC Educational Resources Information Center
Newman, Isadore; And Others
The paper is a methodological inquiry into the interpretation of qualitative data. It explores a grounded-theory approach to the synthesis of data and examines, in particular, the construction of categories. It focuses on ways of organizing and attaching meaning to data, as research problems embedded in a cultural context are explored. A…
Qualitative Analysis of a Synthetic Culture: A Methodological Inquiry.
ERIC Educational Resources Information Center
MacDonald, Suzanne; And Others
The study is a methodological inquiry into the interpretation of qualitative data. It explores a grounded theory approach to the synthesis of data, and examines, in particular, construction of categories. It focuses on ways of organizing data and attaching meaning, as research problems embedded in cultural context are explored. A qualitative…
ERIC Educational Resources Information Center
Azevedo, Roger
2015-01-01
Engagement is one of the most widely misused and overgeneralized constructs found in the educational, learning, instructional, and psychological sciences. The articles in this special issue represent a wide range of traditions and highlight several key conceptual, theoretical, methodological, and analytical issues related to defining and measuring…
Measuring Structural Gender Equality in Mexico: A State Level Analysis
ERIC Educational Resources Information Center
Frias, Sonia M.
2008-01-01
The main goal of this article is to assess the level of gender equality across the 32 Mexican states. After reviewing conceptual and methodological issues related to previous measures of structural inequality I detail the logic and methodology involved in the construction of a composite and multidimensional measure of gender equality, at the…
An Alternative Methodology for Creating Parallel Test Forms Using the IRT Information Function.
ERIC Educational Resources Information Center
Ackerman, Terry A.
The purpose of this paper is to report results on the development of a new computer-assisted methodology for creating parallel test forms using the item response theory (IRT) information function. Recently, several researchers have approached test construction from a mathematical programming perspective. However, these procedures require…
Gender Power in Elite Schools: Methodological Insights from Researcher Reflexive Accounts
ERIC Educational Resources Information Center
Forbes, Joan; Weiner, Gaby
2014-01-01
The main task of this paper is to understand the methodological insights from researchers' reflexive accounts about the production of gender in the specific practices of three Scottish elite schools. Accordingly, the paper poses three questions: How is gender re/constructed through the specific practices of these elite schools? What insights into…
Writing a Rhizome: An (Im)plausible Methodology
ERIC Educational Resources Information Center
Honan, Eileen
2007-01-01
In this paper the author provides an overview of a rhizomatic methodology using illustrations from her doctoral thesis, where she used Deleuze and Guattari's (1987) thinking about rhizomes in three different ways. First, using the figuration of a rhizome allowed her to construct her thesis as non-linear with self-conscious attention paid to the…
An E-Assessment Approach for Evaluation in Engineering Overcrowded Groups
ERIC Educational Resources Information Center
Mora, M. C.; Sancho-Bru, J. L.; Iserte, J. L.; Sanchez, F. T.
2012-01-01
The construction of the European Higher Education Area has been an adaptation challenge for Spanish universities. New methodologies require a more active role on the students' part and come into conflict with the previous educational model characterised by a high student/professor ratio, a lecture-based teaching methodology and a summative…
Parallel computation with the force
NASA Technical Reports Server (NTRS)
Jordan, H. F.
1985-01-01
A methodology, called the force, supports the construction of programs to be executed in parallel by a force of processes. The number of processes in the force is unspecified, but potentially very large. The force idea is embodied in a set of macros which produce multiproceossor FORTRAN code and has been studied on two shared memory multiprocessors of fairly different character. The method has simplified the writing of highly parallel programs within a limited class of parallel algorithms and is being extended to cover a broader class. The individual parallel constructs which comprise the force methodology are discussed. Of central concern are their semantics, implementation on different architectures and performance implications.
Employment of Personnel at the Tucson Border Patrol Station
2017-06-09
RESEARCH METHODOLOGY How should the Tucson Border Patrol Station optimally employ personnel? Using a case study research methodology141 provided...BORSTAR provide better capabilities to respond and greater mobility in risk management.155 The methodologies of case study comparatives include the...35 CHAPTER 3 RESEARCH METHODOLOGY
Satellite-Derived Management Zones
NASA Technical Reports Server (NTRS)
Lepoutre, Damien; Layrol, Laurent
2005-01-01
The term "satellite-derived management zones" (SAMZ) denotes agricultural management zones that are subdivisions of large fields and that are derived from images of the fields acquired by instruments aboard Earth-orbiting satellites during approximately the past 15 years. "SAMZ" also denotes the methodology and the software that implements the methodology for creating such zones. The SAMZ approach is one of several products of continuing efforts to realize a concept of precision agriculture, which involves optimal variations in seeding, in application of chemicals, and in irrigation, plus decisions to farm or not to farm certain portions of fields, all in an effort to maximize profitability in view of spatial and temporal variations in the growth and health of crops, and in the chemical and physical conditions of soils. As used here, "management zone" signifies, more precisely, a subdivision of a field within which the crop-production behavior is regarded as homogeneous. From the perspective of precision agriculture, management zones are the smallest subdivisions between which the seeding, application of chemicals, and other management parameters are to be varied. In the SAMZ approach, the main sources of data are the archives of satellite imagery that have been collected over the years for diverse purposes. One of the main advantages afforded by the SAMZ approach is that the data in these archives can be reused for purposes of precision agriculture at low cost. De facto, these archives contain information on all sources of variability within a field, including weather, crop types, crop management, soil types, and water drainage patterns. The SAMZ methodology involves the establishment of a Web-based interface based on an algorithm that generates management zones automatically and quickly from archival satellite image data in response to requests from farmers. A farmer can make a request by either uploading data describing a field boundary to the Web site or else drawing the boundary on a reference image. Hence, a farmer can start to engage in precision farming shortly after gaining access to the Web site, without the need for incurring the high costs of conventional precision-agriculture data-collection practices that include collecting soil samples, mapping electrical conductivity of soil, and compiling multiyear crop-yield data. Given the boundary of a field, a SAMZ server computes the zones within the field in a three-stage process. In the first stage, a vector-valued image of the field is constructed by assembling, from the archives, the equivalent of a stack of the available images of the field (see figure). In the second stage, the vector-valued image is analyzed by use of a wavelet transform that detects spatial variations considered significant for precision farming while suppressing small-scale heterogeneities that are regarded as insignificant. In the third stage, a segmentation algorithm assembles the zones from smaller regions that have been identified in the wavelet analysis.
SAMZ: Satellite-Derived Management Zones
NASA Technical Reports Server (NTRS)
2004-01-01
The term "satellite-derived management zones" (SAMZ) denotes agricultural management zones that are subdivisions of large fields and that are derived from images of the fields acquired by instruments aboard Earth orbiting satellites during approximately the past 15 years. "SAMZ" also denotes the methodology and the software that implements the methodology for creating such zones. The SAMZ approach is one of several products of continuing efforts to realize a concept of precision agriculture, which involves optimal variations in seeding, in application of chemicals, and in irrigation, plus decisions to farm or not to farm certain portions of fields, all in an effort to maximize profitability in view of spatial and temporal variations in the growth and health of crops and in the chemical and physical conditions of soils. As used here, "management zone" signifies, more precisely, a subdivision of a field within which the crop production behavior is regarded as homogeneous. From the perspective of precision agriculture, management zones are the smallest subdivisions between which the seeding, application of chemicals, and other management parameters are to be varied. In the SAMZ approach, the main sources of data are the archives of satellite imagery that have been collected over the years for diverse purposes. One of the main advantages afforded by the SAMZ approach is that the data in these archives can be reused for purposes of precision agriculture at low cost. De facto, these archives contain information on all sources of variability within a field, including weather, crop types, crop management, soil types, and water drainage patterns. The SAMZ methodology involves the establishment of a Web-based interface based on an algorithm that generates management zones automatically and quickly from archival satellite image data in response to requests from farmers. A farmer can make a request by either uploading data describing a field boundary to the Web site or else drawing the boundary on a reference image. Hence, a farmer can start to engage in precision farming shortly after gaining access to the Web site, without need for incurring the high costs of conventional precision-agriculture data-collection practices that include collecting soil samples, mapping electrical conductivity of soil, and compiling multi-year crop-yield data. Given the boundary of a field, a SAMZ server computes the zones within the field in a three-stage process. In the first stage, a vector-valued image of the field is constructed by assembling, from the archives, the equivalent of a stack of the available images of the field (see figure). In the second stage, the vector-valued image is analyzed by use of a wavelet transform that detects spatial variations considered significant for precision farming while suppressing small-scale heterogeneities that are regarded as insignificant. In the third stage, a segmentation algorithm assembles the zones from smaller regions that have been identified in the wavelet analysis.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... Numerical Simulations Risk Management Methodology November 1, 2010. I. Introduction On August 25, 2010, The... Analysis and Numerical Simulations (``STANS'') risk management methodology. The rule change alters... collateral within the STANS Monte Carlo simulations.\\7\\ \\7\\ OCC believes the approach currently used to...
Developing International Managers: The Contribution of Cultural Experience to Learning
ERIC Educational Resources Information Center
Townsend, Peter; Regan, Padraic; Li, Liang Liang
2015-01-01
Purpose: The purpose of this paper is to evaluate cultural experience as a learning strategy for developing international managers. Design/methodology/approach: Using an integrated framework, two quantitative studies, based on empirical methodology, are conducted. Study 1, with an undergraduate sample situated in the Asia Pacific, aimed to examine…
ERIC Educational Resources Information Center
Armson, Genevieve; Whiteley, Alma
2010-01-01
Purpose: The purpose of this paper is to investigate employees' and managers' accounts of interactive learning and what might encourage or inhibit emergent learning. Design/methodology/approach: The approach taken was a constructivist/social constructivist ontology, interpretive epistemology and qualitative methodology, using grounded theory…
A multicriteria-based methodology for site prioritisation in sediment management.
Alvarez-Guerra, Manuel; Viguri, Javier R; Voulvoulis, Nikolaos
2009-08-01
Decision-making for sediment management is a complex task that incorporates the selections of areas for remediation and the assessment of options for any mitigation required. The application of Multicriteria Analysis (MCA) to rank different areas, according to their need for sediment management, provides a great opportunity for prioritisation, a first step in an integrated methodology that finally aims to assess and select suitable alternatives for managing the identified priority sites. This paper develops a methodology that starts with the delimitation of management units within areas of study, followed by the application of MCA methods that allows ranking of these management units, according to their need for remediation. This proposed process considers not only scientific evidence on sediment quality, but also other relevant aspects such as social and economic criteria associated with such decisions. This methodology is illustrated with its application to the case study area of the Bay of Santander, in northern Spain, highlighting some of the implications of utilising different MCA methods in the process. It also uses site-specific data to assess the subjectivity in the decision-making process, mainly reflected through the assignment of the criteria weights and uncertainties in the criteria scores. Analysis of the sensitivity of the results to these factors is used as a way to assess the stability and robustness of the ranking as a first step of the sediment management decision-making process.
Reengineering health care materials management.
Connor, L R
1998-01-01
Health care executives across the country, faced with intense competition, are being forced to consider drastic cost cutting measures as a matter of survival. The entire health care industry is under siege from boards of directors, management and others who encourage health care systems to take actions ranging from strategic acquisitions and mergers to simple "downsizing" or "rightsizing," to improve their perceived competitive positions in terms of costs, revenues and market share. In some cases, management is poorly prepared to work within this new competitive paradigm and turns to consultants who promise that following their methodologies can result in competitive advantage. One favored methodology is reengineering. Frequently, cost cutting attention is focused on the materials management budget because it is relatively large and is viewed as being comprised mostly of controllable expenses. Also, materials management is seldom considered a core competency for the health care system and the organization performing these activities does not occupy a strongly defensible position. This paper focuses on the application of a reengineering methodology to healthcare materials management.
25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...
Leveraging Text Content for Management of Construction Project Documents
ERIC Educational Resources Information Center
Alqady, Mohammed
2012-01-01
The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…
Code of Federal Regulations, 2013 CFR
2013-04-01
... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...
Code of Federal Regulations, 2010 CFR
2010-04-01
... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...
Code of Federal Regulations, 2012 CFR
2012-04-01
... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...
Code of Federal Regulations, 2011 CFR
2011-04-01
... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...
Behaviorism and the Construction of Knowledge
ERIC Educational Resources Information Center
Faryadi, Qais
2007-01-01
This paper attempts to discuss behaviorism and the construction of knowledge. This review investigates whether behaviorism methodology has any advantages in learning a language in our classroom. This assessment also observes the critics of behaviorism and its weaknesses in a learning environment. This inquiry concentrates on the view point of B.F.…
On Designing Construct Driven Situational Judgment Tests: Some Preliminary Recommendations
ERIC Educational Resources Information Center
Guenole, Nigel; Chernyshenko, Oleksandr S.; Weekly, Jeff
2017-01-01
Situational judgment tests (SJTs) are widely agreed to be a measurement technique. It is also widely agreed that SJTs are a questionable methodological choice for measurement of psychological constructs, such as behavioral competencies, due to a lack of evidence supporting appropriate factor structures and high internal consistencies.…
Testing Crites' Model of Career Maturity: A Hierarchical Strategy.
ERIC Educational Resources Information Center
Wallbrown, Fred H.; And Others
1986-01-01
Investigated the construct validity of Crites' model of career maturity and the Career Maturity Inventory (CMI). Results from a nationwide sample of adolescents, using hierarchical factor analytic methodology, indicated confirmatory support for the multidimensionality of Crites' model of career maturity, and the construct validity of the CMI as a…
ERIC Educational Resources Information Center
Zhang, Shengying; Moradi, Bonnie
2013-01-01
An overview of the evolution of Asian American acculturation and enculturation theory and measurement is offered, focusing on major theoretical advancements and methodological issues that are salient for measuring these constructs. Informed by these considerations, an empirical approach is taken to clarifying the dimensions of Asian American…
ERIC Educational Resources Information Center
Stenner, A. Jackson; Rohlf, Richard J.
The merits of generalizability theory in the formulation of construct definitions and in the determination of reliability estimates are discussed. The broadened conceptualization of reliability brought about by Cronbach's generalizability theory is reviewed. Career Maturity Inventory data from a sample of 60 ninth grade students is used to…
Constructing Meaning from Historical Content: A Research Study
ERIC Educational Resources Information Center
Russell, William Benedict, III; Pellegrino, Anthony
2008-01-01
Through an examination of one undergraduate American history course at a large university in the southeastern United States via interview, observation and content analysis, we attempted to discern if the pedagogical methodology was relating to the students in such a way as to foster students' ability to construct meaning beyond simply…
Emotional Relationships between Mothers* and Infants: Knowns, Unknowns, and Unknown Unknowns
Bornstein, Marc H.; Suwalsky, Joan T. D.; Breakstone, Dana A.
2012-01-01
An overview of the literature pertaining to the construct of emotional availability is presented, illustrated by a sampling of relevant studies. Methodological, statistical, and conceptual problems in the existing corpus of research are discussed, and suggestions for improving future investigations of this important construct are offered. PMID:22292998
Martín-Martínez, María Auxiliadora; Andreu-Sanchez, Jose Luis; Sanchez-Alonso, Fernando; Corominas, Hector; Perez-Venegas, Jose Javier; Roman-Ivorra, Jose Andres; Alperi, Mercedes; Blanco-Alonso, Ricardo; Caliz, Rafael; Chamizo-Carmona, Eugenio; Graña-Gil, Jenaro; Hernández, Blanca; Marras, Carlos; Mazzucchelli, Ramon; Medina Luezas, Julio Antonio; Naranjo-Hernández, Antonio; Ortiz, Ana; Roselló, Rosa; Sanchez-Nievas, Ginés; Sanmartí, Raimon; Vela-Casasempere, Paloma
2017-08-05
The current guidelines in the treatment of rheumatoid arthritis (RA) include the early diagnosis and early use of disease modifying drugs to achieve remission or low disease activity level, known as "Treat to Target" (T2T). The objective of this study is to develop a composite indicator (CI) to evaluate the quality of care in the management of patients with RA, according to the T2T strategy and other general recommendations concerning the management of these patients. The phases of the construction of the CI were: 1) selection of quality criteria through expert judgment; 2) prioritization of the criteria, according to relevance and feasibility, applying the Delphi methodology (two rounds) involving 20 experts; 3) design of quality indicators; and 4) calculation of the weighted CI, using the mean value in relevance and feasibility granted by the experts. The source of information for the calculation of the CI are the medical records of patients with RA. Twelve criteria out of 37 required a second Delphi round. Thirty-one criteria were prioritized. These criteria presented a median in relevance and feasibility greater than or equal to 7.5, with an interquartile range of less than 3.5, and a level of agreement (score greater than or equal to 8) greater than or equal to 80%. The constructed CI allows us to evaluate the quality of care of patients with RA following the T2T strategy in the rheumatology units of Spanish hospitals, offering a valid and easily interpretable summary measure. Copyright © 2017 Elsevier España, S.L.U. and Sociedad Española de Reumatología y Colegio Mexicano de Reumatología. All rights reserved.