Sample records for construction material procurement

  1. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  2. A STUDY ON IMPLEMENTATION OF PROCUREMENT MANAGEMENT METHOD THAT DELIVERLY'S UNCERTAINTY OF EQUIPMENTS, MATERIALS AND INSTRUCTIONS

    NASA Astrophysics Data System (ADS)

    Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki

    This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.

  3. Procurement of novel microanalysis equipment for construction materials.

    DOT National Transportation Integrated Search

    2012-02-01

    The equipment procured (i.e. an Orbis micro X-ray Fluorescence (MXRF) and an APSEX personal Scanning Electron Microscope (PSEM)) is part of the next generation of micro analytical equipment. These tools have the ability to make large volumes of...

  4. U.S.-Coalition Forces and Host Nations: DOTmLPF-P for Contingency Procurements. Part 2. Conclusion

    DTIC Science & Technology

    2014-08-01

    doesn’t have to be stood up. Examples include textile/cloth- ing/ footwear , construction, and furniture, industries that usu- ally exist in some...meet its needs but be within the HNVs’ capability to manufacture. Finally, materials used by HNVs to manufacture products under U.S. or HNG...procurement efforts should come from reliable sources with processes and physical features in place to prevent substandard or fake material from entering the

  5. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  6. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  7. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  8. 7 CFR 1726.175 - General plant materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false General plant materials. 1726.175 Section 1726.175... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General Plant § 1726.175 General plant... determine the procurement method that best meets its needs for purchase of general plant material and...

  9. 7 CFR 1726.250 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Modifications to RUS Standard Contract Forms § 1726.250 General. RUS provides standard forms of contract for the procurement of materials, equipment, and construction and for contract amendments and various related forms for use by RUS borrowers. See § 1726.304 for...

  10. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if... job, less a consideration for loss in service life at 10 percent for rails, angle bars, tie plates and... measures for restoration of affected areas as required by the physical construction or by reason of safety...

  11. 7 CFR 1753.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unacceptable loan security risks to RUS. (4) The P&S or contract have been modified. (e) The requirements and... Telecommunications Loan Documents contain provisions regarding procurement of materials and equipment and... and procedures whenever using loan funds to purchase materials and equipment or perform construction...

  12. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  13. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  14. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  15. Loglines. May - June 2010

    DTIC Science & Technology

    2010-06-01

    able to get construction materials, food and spare parts into a land-locked country . More than 80 percent of the containers shipped through this...procurement management at DLA Oklahoma City, has developed a strategic roadmap for DLR decision-makers. “Trying to get our arms around all the contracts...currently in place and develop - ing a comprehensive approach to future support has been challenging,” Yort said. Transferring procurement of DLRs to

  16. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...

  17. 13 CFR 125.2 - What are SBA's and the procuring agency's responsibilities when providing contracting assistance...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...

  18. Building a Construction Procurement Negotiation Training Game Model: Learning Experiences and Outcomes

    ERIC Educational Resources Information Center

    Dzeng, Ren-Jye; Lin, Ken-Yu; Wang, Pei-Ru

    2014-01-01

    Game-based education is a promising method for encouraging student learning. Although learning construction procurement and negotiation require hands-on practice, in most construction management courses at the college level, this subject is taught by using lectures and case studies. In this study, a construction procurement and negotiation game…

  19. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  20. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  1. 49 CFR 238.103 - Fire safety.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Fire safety. 238.103 Section 238.103... § 238.103 Fire safety. (a) Materials. (1) Materials used in constructing a passenger car or a cab of a... section at the time it was tested. (c) Fire safety analysis for procuring new passenger cars and...

  2. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  3. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  4. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  5. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... that is estimated to cost $250,000, or less, inclusive of labor and materials. (2) The procedures to be...) Materials on hand, until released to the contractor, shall be covered by fire and either wind-storm or... construction are necessary, and the cost of such changes or corrections is properly chargeable to the borrower...

  6. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement

    PubMed Central

    2015-01-01

    This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518

  7. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may... design/build, construction management at risk and force account. If an alternate method is used, the... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Allowable methods of procurement...

  8. Critical analysis of procurement techniques in construction management sectors

    NASA Astrophysics Data System (ADS)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  9. 7 CFR 1755.27 - Borrower contractual obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.27 Borrower contractual obligations. (a) Loan agreement. As a condition of a loan or... pursuant to which the borrowers agree to use RUS standard contract forms for construction, procurement...

  10. 40 CFR 247.10 - Paper and paper products.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Paper and paper products. 247.10... COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.10 Paper and paper products. Paper and paper products, excluding building and construction paper grades. ...

  11. 40 CFR 247.10 - Paper and paper products.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Paper and paper products. 247.10... COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.10 Paper and paper products. Paper and paper products, excluding building and construction paper grades. ...

  12. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936 Procurement. (a) Sections 35.936 through 35.939 set forth policies and minimum standards for procurement of architectural or... under all steps of grants for construction of treatment works. Acquisition of real property shall be...

  13. 7 CFR 1753.48 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...' qualifications for all types of construction and for the required information on the bidder and subcontractors... qualified to submit bids, RUS written approval must be obtained to proceed with requesting bids. (4) Bid...) Materials on hand to be furnished by the borrower shall be released to the contractor at the start of...

  14. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

  15. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  16. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  17. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  18. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  19. 48 CFR 752.7009 - Marking.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also..., marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished... procurement of commodities to be shipped, and as early as possible for project construction sites and other...

  20. 17 CFR 256.01-4 - Construction or service contracts, and centralized procurement accounting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... expenses directly attributable to construction work shall be excluded from the accounting system of the... companies. Cost of goods procured shall be excluded from the accounting system of the service company and... contracts, and centralized procurement accounting. 256.01-4 Section 256.01-4 Commodity and Securities...

  1. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  2. 45 CFR 1309.52 - Procurement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...

  3. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  4. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  5. 13 CFR 305.6 - Allowable methods of procurement for construction services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...

  6. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade...

  7. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade...

  8. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty.... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country..., Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World...

  9. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  10. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  11. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  12. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  13. 7 CFR 1780.72 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  14. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  15. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  16. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  17. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  18. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  19. Green related practices for construction procurement

    NASA Astrophysics Data System (ADS)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  20. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  1. 7 CFR 3565.257 - Procurement actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  2. 48 CFR 52.223-2 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Biobased Products Under Service and Construction Contracts. 52.223-2 Section 52.223-2 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. As prescribed in 23.406(b), insert the following clause: Affirmative...

  3. Causes of shortage and delay in material supply: a preliminary study

    NASA Astrophysics Data System (ADS)

    Rahman, M. M.; Yap, Y. H.; Ramli, N. R.; Dullah, M. A.; Shamsuddin, M. S. W.

    2017-11-01

    Shortage and delay in materials supply is argued to be one of the most important factors that lead to delay in construction project delivery globally. However, the relevant underlying reasons vary from country to country. As such, this paper summarises the outcomes of a study that targeted identifying causes of shortage and delay in materials supply in Brunei Darussalam. The study was conducted through fifteen semi-structured interviews of contractors and materials suppliers in Brunei. The study identified six causes of shortageof materials and nine causes of delay in materials supply in Brunei. The most importantcausefor shortage of materials relates to the origin or availability of construction materials. On the other hand, the most influential cause of delay in material supply was found to be poor materials procurement and inventory management system, which has other underlying reasons such as late identification of the type of materials needed. The observations are expected to help in formulating or reviewing relevant policies, in order to ensure on-time project delivery.

  4. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  5. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  6. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  7. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  8. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  9. A Comparative Study of the Perceived Usefulness of Civilian Institution Contracting-Related Graduate Programs by Graduates and the Perceived Usefulness of the AFIT CAM (Air Force Institute of Technology Contracting and Manufacturing) Program by Graduates

    DTIC Science & Technology

    1985-09-01

    courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management

  10. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    ERIC Educational Resources Information Center

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  11. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  12. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  13. 13 CFR 125.2 - Prime contracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... participation unlikely; (ii) Seeks to package or consolidate discrete construction projects; or (iii) Meets the... participation unlikely, or if a proposed procurement for construction seeks to package or consolidate discrete... discrete projects. (5) In conjunction with their duties to promote the set-aside of procurements for small...

  14. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  15. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  16. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  17. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  18. 41 CFR 61-300.1 - What are the purpose and scope of this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... States for the procurement of personal property and non-personal services (including construction), and... for the procurement of personal property and non-personal services (including construction) was... Relating to Public Contracts OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS' EMPLOYMENT AND TRAINING...

  19. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  20. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  1. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  2. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...

  3. NASA procurement report, FY 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.

  4. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  5. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  6. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... procurements, contain features which unduly restrict competition. The description may include a statement of... requirements of a procurement. The specific features of the named brand which must be met by offerors shall be...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American...

  7. 40 CFR 35.936-21 - Delegation to State agencies; certification of procurement systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; certification of procurement systems. 35.936-21 Section 35.936-21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936-21 Delegation to State agencies; certification of procurement...

  8. NASA procurement report, FY 1993

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  9. Annual Procurement Report, Fiscal Year 1997

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.

  10. Native American lithic procurement along the international border in the boot heel region of southwestern New Mexico

    NASA Astrophysics Data System (ADS)

    Zeigler, K. E.; Hogan, P.; Hughes, C.; Kurota, A.

    2011-06-01

    Multidisciplinary field projects can be very useful to a more fundamental understanding of the world around us, though these projects are not as common as they should be. In particular, the combination of archeology and geology combines our understanding of human behavior and human use of the landscape with an intimate knowledge of geologic processes and the materials available for human use in order to gain a broader understanding of human-Earth interaction. Here we present data from a cross-disciplinary project that uses a common dataset, archeological artifacts, to explore the anthropological and geologic implications of useage patterns. Archeological excavations and surveys conducted by the Office of Contract Archeology in 2007 along the route of the proposed international border fence reveal patterns of use of geologic materials by Archaic, Formative and Protohistoric Native Americans in the Boot Heel of southwestern New Mexico. Thousands of artifacts were recorded in multiple sites from Guadalupe Pass in the southern Peloncillo Mountains to the Carrizalillo Hills west of Columbus. We identified the lithologies of artifacts, ranging from projectile points to groundstones, and then constructed material movement maps based on either known procurement sites ("quarries") or outcrops identified as the closest source to a given site for each lithology. Not unexpectedly, the majority of the rock types utilized by native peoples are local siliceous volcanic materials. However, several artifacts constructed from obsidian were transported into the region from northern Mexico and eastern Arizona, indicating long-distance travel and/or trade routes. We also examine useage pattern difference between Archaic, Formative and Protohistoric sites. Additionally, a dramatic change in distribution of sources for geologic materials occurs between one pre-Spanish site and one post-Spanish site that are adjacent to one another.

  11. Native American lithic procurement along the international border in the boot heel region of southwestern New Mexico

    NASA Astrophysics Data System (ADS)

    Zeigler, K. E.; Hughes, C.; Kurota, A.; Hogan, P.

    2010-12-01

    Multidisciplinary field projects can be very useful to a more fundamental understanding of the world around us, though these projects are not as common as they should be. In particular, the combination of archeology and geology combines our understanding of human behavior and human use of the landscape with an intimate knowledge of geologic processes and the materials available for human use in order to gain a broader understanding of human-Earth interaction. Here we present data from a cross-disciplinary project that uses a common dataset, archeological artifacts, to explore the anthropological and geologic implications of useage patterns. Archeological excavations and surveys conducted by the Office of Contract Archeology in 2007 along the route of the proposed international border fence reveal patterns of use of geologic materials by Archaic, Formative and Protohistoric Native Americans in the Boot Heel of southwestern New Mexico. Thousands of artifacts were recorded in multiple sites from Guadalupe Pass in the southern Peloncillo Mountains to the Carrizalillo Hills west of Columbus. We identified the lithologies of artifacts, ranging from projectile points to groundstones, and then constructed material movement maps based on either known procurement sites ("quarries") or outcrops identified as the closest source to a given site for each lithology. Not unexpectedly, the majority of the rock types utilized by native peoples are local siliceous volcanic materials. However, several artifacts constructed from obsidian were transported into the region from northern Mexico and eastern Arizona, indicating long-distance travel and/or trade routes. We also examine useage pattern difference between Archaic, Formative and Protohistoric sites. Additionally, a dramatic change in distribution of sources for geologic materials occurs between one pre-Spanish site and one post-Spanish site that are adjacent to one another.

  12. Summary data on all NASA procurement actions

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  13. 49 CFR 110.80 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Procurement. 110.80 Section 110.80 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PUBLIC SECTOR...

  14. Energy Systems Integration Newsletter | Energy Systems Integration Facility

    Science.gov Websites

    simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated

  15. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Planning Procurement and Property Proposals & Finance Templates Travel Procurement and Property This

  16. ITS procurement : analysis and recommendations.

    DOT National Transportation Integrated Search

    1994-01-01

    Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been t...

  17. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaeh, R.A.

    1993-04-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 ormore » more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.« less

  18. Long-Term Implications of the 2016 Future Years Defense Program

    DTIC Science & Technology

    2016-01-01

    operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD

  19. 76 FR 81940 - Submission for OMB Review; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Procurements AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Products Under Service and Construction Contracts, is being revised to require prime contractors to report...

  20. Design and engineering analysis of material procurement mobile operation platform

    NASA Astrophysics Data System (ADS)

    Ding, H.; Li, J.

    2014-03-01

    The material procurement mobile operation platform (MPMOP) consists of six modules, including network operation, truck transportation, remote communication, satellite positioning, power supply and environment regulation. The MPMOP is designed to have six major functions, including online procurement, command control, remote communication, satellite positioning, information management and auxiliary decision. The paper implements an engineering analysis on the MPMOP from three aspects, including transportation transfinite, centroid, and power dissipation.

  1. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  2. 41 CFR 101-26.803-3 - Reporting of discrepancies in transportation, shipments, material, or billings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... discrepancies in transportation, shipments, material, or billings. 101-26.803-3 Section 101-26.803-3 Public... REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8-Discrepancies or Deficiencies in GSA or DOD Shipments, Material, or Billings § 101-26.803-3 Reporting of discrepancies in...

  3. Toxic substances alert program

    NASA Technical Reports Server (NTRS)

    Junod, T. L.

    1978-01-01

    A toxicity profile is provided, of 187 toxic substances procured by NASA Lewis Research Center during a 3 1/2 year period, including 27 known or suspected carcinogens. The goal of the program is to assure that the center's health and safety personnel are aware of the procurement and use of toxic substances and to alert and inform the users of these materials as to the toxic characteristics and the control measures needed to ensure their safe use. The program also provides a continuing record of the toxic substances procured, who procured them, what other toxic substances the user has obtained in the past, and where similar materials have been used elsewhere at the center.

  4. 40 CFR 247.6 - Affirmative procurement programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Affirmative procurement programs. 247.6 Section 247.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.6 Affirmative...

  5. Significance of ITER IWS Material Selection and Qualification

    NASA Astrophysics Data System (ADS)

    Mehta, Bhoomi K.; Raval, Jigar; Maheshwari, Abha; Laad, Rahul; Singh, Gurlovleen; Pathak, Haresh

    2017-04-01

    In-Wall Shielding (IWS) is one of the important components of ITER Vacuum Vessel (VV) which fills the space between double walls of VV with cooling water. Procurement Arrangement (PA) for IWS has been signed with Indian Domestic Agency (INDA). Procurement of IWS materials, fabrication of IWS blocks and its delivery to respective Domestic Agency (DA) and ITER Organization (IO) are the main scope of this PA. Hence, INDIA is the only country which is contributing to VV IWS among all seven ITER partners. The main functions of the IWS are to provide Neutron Shielding with blanket, VV shells and water during plasma operations and to reduce ripple of the Toroidal Magnetic Field. To meet these functional requirements IWS blocks are made up of special materials (Borated Steels SS304 B4 & SS304 B7, Ferritic Steels SS 430, Austenitic Steel SS 316 L (N)-IG, XM-19 and Inconel-625) which are qualified, reliable and traceable for the design assessment. The choice of these materials has a significant influence on performance, maintainability, licensing, detailed design parameters and waste disposal. The main reasons for the materials selected for IWS are its high mechanical strength at operating temperatures, water chemistry properties, excellent fabrication characteristics and low cost relative to other similar materials. All the materials are qualified with respect to their respective codes (ASTM/EN standards with additional requirements as described in RCC-MR code 2007) and ITER requirements. Agreed Notified Body (ANB) has control conformity of materials certificates with approved material specification and traceability procedure for Safety Important Component (SIC). The procurement strategy for all the IWS materials has been developed in close collaboration with IO, ANB and Industries as per Product Procurement Specification (PPS). The R&D for sample, bulk material production, testing, inspection and handling as required are carried out by IN DA and IO. At present almost all IWS materials (∼2500 Tons) has been procured by IN DA with spares to manufacture ∼9000 IWS blocks. This paper summarizes IWS material selection, qualification and procurement processes in detail.

  6. Procurement of construction services: a case study on bidding competition in Singapore public sector contracts

    NASA Astrophysics Data System (ADS)

    Oo, B. L.; Yan, Y.

    2018-04-01

    There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.

  7. Protecting the Environment Through Public Procurement Law - The Case of Poland

    NASA Astrophysics Data System (ADS)

    Kozik, Renata; Karasińska-Jaśkowiec, Izabela

    2016-10-01

    The article presents the results of studies whose aim was to analyse public procurement procedures in the context of environmental protection, especially wastewater infrastructure, performed in the selected Polish municipalities. The selection criterions were the time of public procurement procedure - from 2009 until 2015 and that the contract was cofinanced by the European Union funds. The contracting authorities responsible for awarding specific contracts, were asked series of detailed questions about the environmental criteria and requirements contained in the tender documents for the construction contracts related to the wastewater infrastructure. The aim of the detailed study was to determine whether the actions taken by the contracting authorities in a tender procedure for the construction or operation of wastewater infrastructure include environmental issues. Authors examine also the applicable public procurement law regulation in Poland and Europe in the context of sustainable development and environmental protection. The study of public procurement law was to check whether the law regulation fully takes into account the environmental aspects of the planned investments. On this basis, conclusions have been made that laws are consistent and do not constitute an obstacle to awarding a contract positively affecting the environment.

  8. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...

  9. 40 CFR 35.925-20 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement. 35.925-20 Section 35.925-20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-20...

  10. 40 CFR 35.925-20 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement. 35.925-20 Section 35.925-20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-20...

  11. Environmental Criteria in the Spanish Public Works Procurement Process.

    PubMed

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-02-18

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as "Green 7", in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  12. 75 FR 6869 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... documents other than rules #0;or proposed rules that are applicable to the public. Notices of hearings #0... Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds to the... Procurement List. After consideration of the material presented to it concerning capability of qualified...

  13. 7 CFR 277.14 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... qualitative nature of the material, product or service desired and, when necessary, shall set forth those... technical resources. (g) Procurement methods. State agency procurements made in whole or in part with program funds shall be by one of the following methods: (1) Small purchase procedures are those relatively...

  14. Interval linear programming model for long-term planning of vehicle recycling in the Republic of Serbia under uncertainty.

    PubMed

    Simic, Vladimir; Dimitrijevic, Branka

    2015-02-01

    An interval linear programming approach is used to formulate and comprehensively test a model for optimal long-term planning of vehicle recycling in the Republic of Serbia. The proposed model is applied to a numerical case study: a 4-year planning horizon (2013-2016) is considered, three legislative cases and three scrap metal price trends are analysed, availability of final destinations for sorted waste flows is explored. Potential and applicability of the developed model are fully illustrated. Detailed insights on profitability and eco-efficiency of the projected contemporary equipped vehicle recycling factory are presented. The influences of the ordinance on the management of end-of-life vehicles in the Republic of Serbia on the vehicle hulks procuring, sorting generated material fractions, sorted waste allocation and sorted metals allocation decisions are thoroughly examined. The validity of the waste management strategy for the period 2010-2019 is tested. The formulated model can create optimal plans for procuring vehicle hulks, sorting generated material fractions, allocating sorted waste flows and allocating sorted metals. Obtained results are valuable for supporting the construction and/or modernisation process of a vehicle recycling system in the Republic of Serbia. © The Author(s) 2015.

  15. 77 FR 44065 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... FAR. List of Subjects in 48 CFR Parts 1, 16, 22, and 52 Government procurement. Dated: July 16, 2012...--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS 22.1801 [Amended] 0 4. Amend section 22.1801 by-- 0 a... Affirmative Procurement of Biobased Products Under Service and Construction Contracts. * * * * * Affirmative...

  16. Procurement Forms | NREL

    Science.gov Websites

    Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information

  17. ProCure21+ should speed scheme starts.

    PubMed

    Baillie, Jonathan

    2010-11-01

    This October saw the launch of the new ProCure21+ National Framework under which, the Department of Health (DH) team behind the new scheme claims, the NHS can potentially save a further pound 200 million of public money on top of the substantial sums saved under predecessor, ProCure21, via faster, more streamlined procurement, design, planning, and construction, of publicly-funded healthcare schemes. HEJ editor Jonathan Baillie discussed, with the DH's senior responsible officer (SRO) and P21+ team leader Peter Sellars, the background to the new Framework's introduction, the success of its forerunner, and the additional benefits that ProCure21 + (which is backed by organisations incuding HM Treasury, the National Audit Office, and the Office of Government Commerce) should bring to the entire healthcare building supply chain.

  18. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  19. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  20. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  1. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  2. Competition in the economic crisis: Analysis of procurement auctions.

    PubMed

    Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine

    2015-01-01

    We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.

  3. 48 CFR 1323.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404 Agency affirmative procurement...

  4. A Conceptual Framework for Procurement Decision Making Model to Optimize Supplier Selection: The Case of Malaysian Construction Industry

    NASA Astrophysics Data System (ADS)

    Chuan, Ngam Min; Thiruchelvam, Sivadass; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Mat Husin, Norhayati; Yong, Lee Choon; Ghazali, Azrul; Ezanee Rusli, Mohd; Itam, Zarina Binti; Beddu, Salmia; Liyana Mohd Kamal, Nur

    2016-03-01

    This paper intends to fathom the current state of procurement system in Malaysia specifically in the construction industry in the aspect of supplier selection. This paper propose a comprehensive study on the supplier selection metrics for infrastructure building, weight the importance of each metrics assigned and to find the relationship between the metrics among initiators, decision makers, buyers and users. With the metrics hierarchy of criteria importance, a supplier selection process can be defined, repeated and audited with lesser complications or difficulties. This will help the field of procurement to improve as this research is able to develop and redefine policies and procedures that have been set in supplier selection. Developing this systematic process will enable optimization of supplier selection and thus increasing the value for every stakeholders as the process of selection is greatly simplified. With a new redefined policy and procedure, it does not only increase the company’s effectiveness and profit, but also make it available for the company to reach greater heights in the advancement of procurement in Malaysia.

  5. 46 CFR 381.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., material or commodities: (1) Procured, contracted for or otherwise obtained within or outside the United... advances funds or credits or guarantees the convertability of foreign currencies. (4) Procured, contracted...

  6. 46 CFR 381.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., material or commodities: (1) Procured, contracted for or otherwise obtained within or outside the United... advances funds or credits or guarantees the convertability of foreign currencies. (4) Procured, contracted...

  7. 78 FR 12295 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  8. Governing the postmortem procurement of human body material for research.

    PubMed

    Van Assche, Kristof; Capitaine, Laura; Pennings, Guido; Sterckx, Sigrid

    2015-03-01

    Human body material removed post mortem is a particularly valuable resource for research. Considering the efforts that are currently being made to study the biochemical processes and possible genetic causes that underlie cancer and cardiovascular and neurodegenerative diseases, it is likely that this type of research will continue to gain in importance. However, post mortem procurement of human body material for research raises specific ethical concerns, more in particular with regard to the consent of the research participant. In this paper, we attempt to determine which consent regime should govern the post mortem procurement of body material for research. In order to do so, we assess the various arguments that could be put forward in support of a duty to make body material available for research purposes after death. We argue that this duty does in practice not support conscription but is sufficiently strong to defend a policy of presumed rather than explicit consent.

  9. Environmental Criteria in the Spanish Public Works Procurement Process

    PubMed Central

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects. PMID:28218706

  10. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  11. 78 FR 76700 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ...-Oman Free Trade Agreement (United States-Oman FTA), Chapter 9 of the United States- Panama Trade... FTA, Chapter 10 of NAFTA, Chapter 9 of the United States-Oman FTA, Chapter 9 of the United States...) Procurement of construction services--$12,721,740. IX. United States-Oman FTA, Chapter 9 A. Central Level...

  12. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  13. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  14. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...

  15. The NIH analytical methods and reference materials program for dietary supplements.

    PubMed

    Betz, Joseph M; Fisher, Kenneth D; Saldanha, Leila G; Coates, Paul M

    2007-09-01

    Quality of botanical products is a great uncertainty that consumers, clinicians, regulators, and researchers face. Definitions of quality abound, and include specifications for sanitation, adventitious agents (pesticides, metals, weeds), and content of natural chemicals. Because dietary supplements (DS) are often complex mixtures, they pose analytical challenges and method validation may be difficult. In response to product quality concerns and the need for validated and publicly available methods for DS analysis, the US Congress directed the Office of Dietary Supplements (ODS) at the National Institutes of Health (NIH) to accelerate an ongoing methods validation process, and the Dietary Supplements Methods and Reference Materials Program was created. The program was constructed from stakeholder input and incorporates several federal procurement and granting mechanisms in a coordinated and interlocking framework. The framework facilitates validation of analytical methods, analytical standards, and reference materials.

  16. The trajectories of Prevention through Design in construction.

    PubMed

    Toole, T Michael; Gambatese, John

    2008-01-01

    Construction Hazards Prevention through Design (CHPtD) is a process in which engineers and architects explicitly consider the safety of construction workers during the design process. Although articles on CHPtD have appeared in top construction journals, the literature has not addressed technical principles underlying CHPtD to help designers better perform CHPtD, to facilitate the development of additional CHPtD tools, and to predict the future path of CHPtD. This theoretical paper uses the existing literature on CHPtD and current action research associated with several CHPtD workgroups to analyze how CHPtD will likely evolve over the coming decades. There are four trajectories along which CHPtD will progress. (a) Designs will increasingly facilitate prefabricated construction; (b) designers will increasingly choose materials and systems that are inherently safer than alternatives; (c) designers will increasingly perform construction engineering; and (d) designers will increasingly apply spatial considerations to reduce worker hazards. By understanding how CHPtD may be manifested in the engineering-procurement-construction (EPC) industry, practitioners can better prepare for adopting CHPtD within their organizations and construction and engineering educators can better prepare their graduates to perform CHPtD.

  17. Department of the Army Justification of Estimates for Fiscal Year 1986. Procurement Appropriations-Construction Program Submitted to Congress February 1985. Part 1. DD Forms 1391.

    DTIC Science & Technology

    1985-02-01

    CATALOG NUMBER 4. TITLE (and Subtitle)(in 6 parts) Department of the Army S. TYPE OF REPORT & PERIOD COVERED Justification of Estimates for Fiscal Year... 6 - PERFORMING ORG. REPORT NUMBER Veh., Ammunition, Other Procurement & Constr Proer ms 7. AUTHOR(a) 8. CONTRACT OR GRANT NUMBER(&) 5 Department of...I ry 19e 6 MILITAP. Y CONSTRUCTION PRO3[CT DATA I-.-1 005 I .. . . .. . .LL .... _ I . a,.-ta13st an and toction I A.. Project Title St rttford Arcy

  18. Codes Don't Always Get Enforced, But Contracts Do: Changing the Procurement Paradigm to Drive Building Energy Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A; Scheib, Jennifer G; Pless, Shanti

    New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changingmore » the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.« less

  19. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fitzpatrick, Stephen W.

    This project involved a three-year program managed by BioMetics, Inc. (Waltham, MA) to demonstrate the commercial feasibility of Biofine thermochemical process technology for conversion of cellulose-containing wastes or renewable materials into levulinic acid, a versatile platform chemical. The program, commencing in October 1995, involved the design, procurement, construction and operation of a plant utilizing the Biofine process to convert 1 dry ton per day of paper sludge waste. The plant was successfully designed, constructed, and commissioned in 1997. It was operated for a period of one year on paper sludge from a variety of source paper mills to collect datamore » to verify the design for a commercial scale plant. Operational results were obtained for four different feedstock varieties. Stable, continuous operation was achieved for two of the feedstocks. Continuous operation of the plant at demonstration scale provided the opportunity for process optimization, development of operational protocols, operator training and identification of suitable materials of construction for scale up to commercial operation . Separated fiber from municipal waster was also successfully processed. The project team consisted of BioMetics Inc., Great Lakes Chemical Corporation (West Lafayette, IN), and New York State Energy Research and Development Authority (Albany, NY).« less

  1. Public perspectives on biospecimen procurement: what biorepositories should consider.

    PubMed

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  2. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... developmental and transitional stages of program participation. (2) Construction competitions. Based on its knowledge of the 8(a) BD portfolio, SBA will determine whether a competitive 8(a) construction requirement... construction. (3) If SBA determines that the apparent successful offeror is ineligible, SBA will notify the...

  3. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  4. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  5. 22 CFR 228.17 - Special procurement rules for construction and engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...

  6. Proceedings: 1990 EPRI gas turbine procurement seminar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, B.L.; Miller, M.N.

    1991-06-01

    This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less

  7. Hunter-gatherer mobility and embedded raw-material procurement strategies in the mediterranean upper paleolithic.

    PubMed

    Tomasso, Antonin; Porraz, Guillaume

    2016-05-06

    Since the early 1980s, the sourcing of lithic raw materials has become central to studies of the territorial range and mobility strategies of Pleistocene foraging societies. Results have been fruitful but somehow repetitive. We will discuss the embedded procurement strategy, which presumes that raw material acquisition was part of other subsistence activities rather than an autonomous technological task. We argue that this theoretical assumption, when taken as dogma, restricts the role of technology in human history and also underestimates the way some lithic resources may have affected the organization of past hunter-gatherers. We base our discussion on the Upper Paleolithic (UP) from the Liguro-Provençal arc, with examples from the Proto-Aurignacian and the Epigravettian. Our regional record shows that in this context the movement of rocks over distances greater than 100 km was the norm rather than the exception. We argue that these long-distance procurements mirror technical needs that were oriented toward the selection of high-quality flints. We support the hypothesis that indirect procurement was an important component of regional socio-economic networks. © 2016 Wiley Periodicals, Inc.

  8. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    NASA Astrophysics Data System (ADS)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  9. Analysis of Critical Parts and Materials

    DTIC Science & Technology

    1980-12-01

    1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order

  10. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ...), Chapter 9 of the United States-Peru Trade Promotion Agreement (U.S.-Peru TPA), and Chapter 13 of the..., Chapter 9 of the U.S.-Peru TPA, and Chapter 13 of the U.S.-Singapore FTA, do hereby determine, effective... Entities-- $622,000; (2) Procurement of construction services--$12,399,671. IX. U.S.-Peru TPA, Chapter 9 A...

  11. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  12. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  13. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  14. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  15. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  16. A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation

    PubMed Central

    Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869

  17. A cost-minimization analysis of tissue-engineered constructs for corneal endothelial transplantation.

    PubMed

    Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S

    2014-01-01

    Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.

  18. E-procurement and automatic identification: enhancing supply chain management in the healthcare industry.

    PubMed

    Smith, Alan D; Flanegin, Frank R

    2004-01-01

    The concepts of automated e-procurement, or electronic B2B (business-to-business) trade, are grounded in the strategic leveraging of both tangible/intangible assets for successful implementation and execution of electronic trade, resulting in significant financial benefits for firms. Some of the major reasons for this growth include significant process savings from automation, compliance, and purchasing advantage; and reduced costs that organisations can experience by conducting transactions electronically. Although these are the basic benefits associated with generic e-commerce strategies, a majority of these B2B transactions have focused on the purchase of indirect materials (especially office products and travel services). In fact, more than 93% of medical supplies on hospital shelves appear to have universal product numbers on them--at least while still in their boxes and there is a great potential for huge savings in e-procurement in the healthcare field. However, other types of supply chain-related purchases, including maintenance, repair, and operating and replacement parts, and direct material purchases, are becoming more important operational management considerations. In addition, several other key considerations are: existing procurement strategy, the vendor, technology, suppliers, and total costs of ownership. Companies need to analyse their current procurement strategy before developing an e-procurement plan.

  19. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & ; Finance Templates Travel One-Stop Acknowledging MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Finance Templates Travel Human Resources General

  20. 48 CFR 9903.305 - Materiality.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 9903.305 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS... Government funding. Changes in accounting treatment will have more impact if they influence the distribution...

  1. 48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...

  2. Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider

    PubMed Central

    L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura

    2013-01-01

    Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089

  3. 75 FR 13765 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... a project labor agreement (PLA), as they may decide appropriate, on large-scale construction... efficiency in Federal procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor...

  4. Myths, Misconceptions, and Realities about Public Procurement Automation.

    ERIC Educational Resources Information Center

    Bonner, Larry

    1989-01-01

    Meaningful public procurement and inventory management automation encompasses all purchasing and materials management processes, including bidder selection; bidder responsiveness tracking; preparation of bid solicitations; bid tabulation; the tracking of requisitions, bid solicitations, and deliveries; and item purchasing history reports. (MLH)

  5. A Synopsis of Acquisition Related Topics.

    DTIC Science & Technology

    1983-03-01

    ALLOCAriON OF G & A TO CCST OBJECTIVES 65 1. Discussion . .. . . . . . . .. . . 65 2. General and Administr4tive Expense Difinition ... quantitative terms. Ths validity of standards used must bs assessed for each procur=ment office independently, because they will vary wit: materials, markets

  6. Vietnam Report, Number 2393, Tap Chi Cong San, Number 6, June 1982.

    DTIC Science & Technology

    1982-09-14

    PROCUREMENT OF PUBLICATIONS JPRS publications may be ordered from the National Technical Information Service, Springfield, Virginia 22161. In order- ing, it...to matters other than procurement may be addressed to Joint Publications Research Service, 1000 North Glebe Road, Arlington, Virginia 22201. JPRS...concentrate all efforts on preventing the other side from making a wrong move, thereby formulating a constructive solution to the replacement of the arms

  7. Price vs. Performance: The Value of Next Generation Fighter Aircraft

    DTIC Science & Technology

    2007-03-01

    forms. Both the semi-log and log-log forms were plagued with heteroskedasticity (according to the Breusch - Pagan /Cook-Weisberg test ). The RDT&E models...from 1949-present were used to construct two models – one based on procurement costs and one based on research, design, test , and evaluation (RDT&E...fighter aircraft hedonic models include several different categories of variables. Aircraft procurement costs and research, design, test , and

  8. Management systems research study

    NASA Technical Reports Server (NTRS)

    Bruno, A. V.

    1975-01-01

    The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

  9. Current Chinese Leadership Update

    DTIC Science & Technology

    1985-08-01

    Horst Soelle fontacts East German Minister for the Construction of Heavy Machinery and Equipment Rolf Kersten 6 Contacts East German Deputy Minister for...Minister for Defense for Procurement Adam Butler Ana_1sis Commander of the CPLA Air Force Zhang Tingfa visited 9 France (29 May-9 June 1985) and the...Chief Marshal Sir Keith Williamson, MinisteL of Defense for Procurement Adam Butler, and other unidentified British military officials. Zhang visited

  10. Cost effective nuclear commercial grade dedication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maletz, J.J.; Marston, M.J.

    1991-01-01

    This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less

  11. 7 CFR 1726.301 - Borrower contractual obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES RUS Standard Forms § 1726.301... which the borrower agrees to use RUS standard forms of contracts for construction, procurement... agreements as implemented by this part, borrowers must use those forms of contract (hereinafter sometimes...

  12. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  13. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project ismore » now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw, labor un ions, and the local community in creating and executing a successful project.« less

  14. Composite Bus Structure for the SMEX/WIRE Satellite

    NASA Technical Reports Server (NTRS)

    Rosanova, Giulio G.

    1998-01-01

    In an effort to reduce the weight and optimize the structural design of the Small Explorer (SMEX) Wide-Field Infrared Explorer (WIRE) spacecraft, it has become desirable to change the material and construction from mechanically fastened aluminum structure to a fully bonded fiber-reinforced composite (FRC) structure. GSFC has developed the WIRE spacecraft structural bus design concept, including the instrument and launch vehicle requirements. The WIRE Satellite is the fifth of a series of SMEX satellites to be launched once per year. GSFC has chosen Composite Optics Inc. (COI) as the prime contractor for the development and procurement of the WIRE composite structure. The detailed design of the fully bonded FRC structure is based on COI's Short Notice Accelerated Production SATellite ("SNAPSAT") approach. SNAPSAT is a state of the art design and manufacturing technology for advanced composite materials which utilizes flat-stock detail parts bonded together to produce a final structural assembly. The structural design approach adopted for the WIRE structure provides a very viable alternative to both traditional aluminum construction as well as high tech. molded type composite structures. This approach to composite structure design is much less costly than molded or honeycomb sandwich type composite construction, but may cost slightly more than conventional aluminum construction on the subsystem level. However on the overall program level the weight saving achieved is very cost effective, since the primary objective is to allocate more mass for science payloads.

  15. 41 CFR 101-26.310 - Ordering errors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....310 Section 101-26.310 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND... provisions of this § 101-26.310, GSA may authorize agencies to return for credit material that has been...

  16. Perimeter intrusion detection and assessment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eaton, M.J.; Jacobs, J.; McGovern, D.E.

    1977-11-01

    To obtain an effective perimeter intrusion detection system requires careful sensor selection, procurement, and installation. The selection process involves a thorough understanding of the unique site features and how these features affect the performance of each type of sensor. It is necessary to develop procurement specifications to establish acceptable sensor performance limits. Careful explanation and inspection of critical installation dimensions is required during on-site construction. The implementation of these activities at a particular site is discussed.

  17. 2 CFR 215.40 - Purpose of procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 215.40 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement... ensure that such materials and services are obtained in an effective manner and in compliance with the...

  18. 77 FR 33269 - Designation of Product Categories for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... under such a contract.'' Thus, Federal contractors, as well as Federal agencies, are expressly subject... generally to procure such a product composed of the highest percentage of recovered materials content... those product categories that contain the highest biobased content. In addition, as the program matures...

  19. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    DTIC Science & Technology

    2013-03-01

    Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research

  20. A case study : Michigan Intelligent Transportation System Center : use of a design/build/warranty contract

    DOT National Transportation Integrated Search

    2000-03-01

    Many ITS projects are stand-alone in nature, and do not have to be procured under rules for construction. The installation of field devices and communications infrastructure often meets the definition of construction. However, if a project involves t...

  1. 75 FR 6795 - Designation of Biobased Items for Federal Procurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ...The U.S. Department of Agriculture (USDA) is proposing to amend the Guidelines for Designating Biobased Products for Federal Procurement (Guidelines) to add nine sections that will designate the following items within which biobased products would be afforded Federal procurement preference: Disposable tableware; expanded polystyrene foam recycling products; heat transfer fluids; ink removers and cleaners; mulch and compost materials; multipurpose lubricants; office paper; topical pain relief products; and turbine drip oils. USDA is also proposing minimum biobased contents for each of these items.

  2. 23 CFR Appendix B to Subpart B of... - Required Contract Provisions, Appalachian Development Highway System and Local Access Roads...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Opportunity: Employment Practices. IV. Equal Opportunity: Selection of Subcontractors, Procurement of... pay or other forms of compensation; and selection of training, including apprenticeship. The... selection of subcontractors, procurement of materials, and leasing of equipment. During the performance of...

  3. 3 CFR 13502 - Executive Order 13502 of February 6, 2009. Use of Project Labor Agreements for Federal...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... developing by providing structure and stability to large-scale construction projects, thereby promoting the... procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing... construction projects receiving Federal financial assistance, would help to promote the economical, efficient...

  4. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste-water treatment works project and wishes to retain that firm or individual during construction of...) Construction grants awarded under Title II of the Clean Water Act are subject to the following “Buy American” requirements in paragraphs (c)(5) (i)-(iii) of this section. Section 215 of the Clean Water Act requires that...

  5. 76 FR 28333 - Electric Engineering, Architectural Services, Design Policies and Construction Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... CFR Parts 1724 and 1726 RIN 0572-AC20 Electric Engineering, Architectural Services, Design Policies... standard forms of contracts promulgated by RUS for construction, procurement, engineering services and... XVII of title 7 of the Code of Federal Regulations as follows: PART 1724--ELECTRIC ENGINEERING...

  6. 7 CFR 2902.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Plastic insulating foam for residential and... BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  7. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  8. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  9. 7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...

  10. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  11. Cell module and fuel conditioner

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1980-01-01

    Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.

  12. Compulsory licensing often did not produce lower prices for antiretrovirals compared to international procurement.

    PubMed

    Beall, Reed F; Kuhn, Randall; Attaran, Amir

    2015-03-01

    Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.

  13. The transformation of the tender evaluation process in public procurement in Poland

    NASA Astrophysics Data System (ADS)

    Plebankiewicz, E.; Kozik, R.

    2017-10-01

    Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.

  14. Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers

    NASA Astrophysics Data System (ADS)

    Tabrizi, Babak H.; Ghaderi, Seyed Farid

    2016-09-01

    Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.

  15. 2 CFR 1532.1205 - What procedures must I follow to have my procurement and nonprocurement eligibility reinstated...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Clean Water Act § 1532.1205 What procedures must I follow to have my procurement and nonprocurement... how those conditions have been corrected, relieved or addressed. Your request must include documentation sufficient to support all material assertions you make. The debarring official must determine that...

  16. 2 CFR 1532.1205 - What procedures must I follow to have my procurement and nonprocurement eligibility reinstated...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Clean Water Act § 1532.1205 What procedures must I follow to have my procurement and nonprocurement... how those conditions have been corrected, relieved or addressed. Your request must include documentation sufficient to support all material assertions you make. The debarring official must determine that...

  17. 48 CFR 9904.407 - Use of standard costs for direct material and direct labor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407 Use of standard costs for direct... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Use of standard costs for...

  18. 77 FR 34025 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ..., Engineering Research & Development Center (ERDC), Construction Engineering Research Lab (CERL), 2902 Newmark... W2R2 Const Engrg Lab, Champaign, IL Patricia Briscoe, Deputy Director, Business Operations (Pricing and...

  19. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if... projects where a company actually suffers loss by application of credits, the company shall have the...

  20. One-year assessment of joint procurement of pharmaceuticals in the public health sector in Jordan.

    PubMed

    Al-Abbadi, Ibrahim; Qawwas, Abdelraouf; Jaafreh, Mahmoud; Abosamen, Taher; Saket, Maisa

    2009-06-01

    About 10% of the gross domestic product in Jordan is spent on health care, and almost one third of that is spent on pharmaceuticals. The public health sector in Jordan has 4 main governmental parties that purchase medicines independently through annual tenders (ie, the process of bidding, being awarded, ordering, paying for, and receiving drugs) issued in the generic (or scientific) name of the medicines or therapeutic groups. Double purchasing is a problem that leads to higher spending on drugs and poor availability of medicines throughout the year. To remedy this problem, a joint procurement process was established in Jordan in 2004 and went into practice in 2006. The aim of this research was to assess the first year of purchasing pharmaceuticals in the public health sector in Jordan through the joint procurement process for the 4 participating parties in comparison with purchasing pharmaceuticals independently before the institution of joint procurement. The first tender under the joint procurement process was issued in 2007 for antibiotics, anti-HIV medications, and antituberculosis agents, which represent 15% of the annual pharmaceutical public-sector purchases in Jordan. A research committee solicited lists of purchased quantities and final purchase prices of these pharmaceuticals obtained in 2006 by each participating group and in 2007 through the joint procurement process. The quantity-comparison method was used to compare the costs of drugs purchased in 2006 and 2007, and estimated cost savings were calculated for each product for each party for 2006 and 2007 under the assumption that the same quantities purchased by each participating party in 2006 would be purchased through joint procurement (prices of 2007). Purchasing through the joint procurement process achieved an estimated savings of 2.4%. This savings increased to 8.9% after excluding 1 item (a cephalosporin), the raw material price of which increased markedly in 2007 compared with 2006 because of an international shortage of raw materials. Based on these initial findings, applying a joint procurement system for pharmaceuticals in the public health sector in Jordan has potential to reduce expenditures for the purchase of medicines and provide treatment continuously throughout the year.

  1. 76 FR 71121 - Notice of Proposed Buy America Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... seeking a waiver for the procurement of glass panels needed to construct two structural glass pavilions... produced in the United States. 49 CFR 661.7(c)(1). Structural glass is a manufactured product. As such, it.... The proposals included glass panels to be utilized in the construction of two structural glass...

  2. 75 FR 16825 - Notice of Modifications to U.S. Commitments Under the World Trade Organization Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... hearing- or speech-impairments may access this number through TTY by calling the toll-free Federal... construction project, and the total construction project has an estimated value of more than $7,804,000....S. Commitments Under the World Trade Organization Government Procurement Agreement To Implement...

  3. Sandia National Laboratories: Working with Sandia: Procurement:

    Science.gov Websites

    Payrolls Before you can submit a timecard you must enter your employees. Please see the Contractor Job Aid link for that specific contract. Please refer to the Contractor Job Aid (MS Word)for further @sandia.gov. Contractor ES&H ES&H for Construction & Service Contracts 01065 Construction Standard

  4. INNOVATIVE FOSSIL FUEL FIRED VITRIFICATION TECHNOLOGY FOR SOIL REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Hnat; L.M. Bartone; M. Pineda

    2001-07-13

    This Summary Report summarizes the progress of Phases 3, 3A and 4 of a waste technology Demonstration Project sponsored under a DOE Environmental Management Research and Development Program and administered by the U.S. Department of Energy National Energy Technology Laboratory-Morgantown (DOE-NETL) for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation''. The Summary Reports for Phases 1 and 2 of the Program were previously submitted to DOE. The total scope of Phase 3 was to have included the design, construction and demonstration of Vortec's integrated waste pretreatment and vitrification process for the treatment of low level waste (LLW), TSCA/LLWmore » and mixed low-level waste (MLLW). Due to funding limitations and delays in the project resulting from a law suit filed by an environmental activist and the extended time for DOE to complete an Environmental Assessment for the project, the scope of the project was reduced to completing the design, construction and testing of the front end of the process which consists of the Material Handling and Waste Conditioning (MH/C) Subsystem of the vitrification plant. Activities completed under Phases 3A and 4 addressed completion of the engineering, design and documentation of the Material Handling and Conditioning System such that final procurement of the remaining process assemblies can be completed and construction of a Limited Demonstration Project be initiated in the event DOE elects to proceed with the construction and demonstration testing of the MH/C Subsystem.« less

  5. Guidelines for the use of fiberglass reinforced plastic in utility FGD systems. [Flue gas desulfurization (FGD); contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rapoza, R.J.; Vollmer, H.R.; Haberly, K.L.

    1992-11-01

    Fiberglass reinforced plastic (FRP) materials offer excellent corrosion-resistant properties and long-term cost advantages compared to exotic alloys or organic lining systems. This guideline document provides potential buyers of FRP FGD (flue gas desulfurization) equipment with enough knowledge of FRP materials and methods to make informed decisions when procuring FRP equipment or services. It is divided into the following chapters: application criteria, procurement strategies, FRP basics, guidelines for designing FRP equipment, quality management. A glossary and manufacturers information/recommendations are included.

  6. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  7. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  8. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  9. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  10. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  11. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  12. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  13. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  14. 7 CFR 1726.205 - Multiparty lump sum quotations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.205 Multiparty lump sum quotations. The borrower or its engineer must contact a sufficient number of...

  15. 7 CFR 1726.204 - Multiparty unit price quotations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.204 Multiparty unit price quotations. The borrower or its engineer must contact a sufficient number of...

  16. 77 FR 22289 - Procurement List Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ...-McChord, WA. Stryker National Logistics Center, Building 2701 C Street SW., Auburn, WA. NPA: Skookum... Center, Construction Engineering Research Lab (ERDC-CERL), 2902 Newmark Drive, Champaign, IL. AT&T...

  17. Construction Quality Assurance Act of 2009

    THOMAS, 111th Congress

    Rep. Kanjorski, Paul E. [D-PA-11

    2009-07-31

    House - 10/23/2009 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  18. Organ procurement from executed prisoners in China.

    PubMed

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  19. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon

    PubMed Central

    Guiterman, Christopher H.; Dean, Jeffrey S.

    2016-01-01

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon. PMID:26644552

  20. Eleventh-century shift in timber procurement areas for the great houses of Chaco Canyon.

    PubMed

    Guiterman, Christopher H; Swetnam, Thomas W; Dean, Jeffrey S

    2016-02-02

    An enduring mystery from the great houses of Chaco Canyon is the origin of more than 240,000 construction timbers. We evaluate probable timber procurement areas for seven great houses by applying tree-ring width-based sourcing to a set of 170 timbers. To our knowledge, this is the first use of tree rings to assess timber origins in the southwestern United States. We found that the Chuska and Zuni Mountains (>75 km distant) were the most likely sources, accounting for 70% of timbers. Most notably, procurement areas changed through time. Before 1020 Common Era (CE) nearly all timbers originated from the Zunis (a previously unrecognized source), but by 1060 CE the Chuskas eclipsed the Zuni area in total wood imports. This shift occurred at the onset of Chaco florescence in the 11th century, a time with substantial expansion of existing great houses and the addition of seven new great houses in the Chaco Core area. It also coincides with the proliferation of Chuskan stone tools and pottery in the archaeological record of Chaco Canyon, further underscoring the link between land use and occupation in the Chuska area and the peak of great house construction. Our findings, based on the most temporally specific and replicated evidence of Chacoan resource procurement obtained to date, corroborate the long-standing but recently challenged interpretation that large numbers of timbers were harvested and transported from distant mountain ranges to build the great houses at Chaco Canyon.

  1. Service Delivery to the Handicapped: The Role of the Federal Procurement Process. Part II. Selecting Contractors by Competitive Award.

    ERIC Educational Resources Information Center

    Donaldosn, William S.; Stephens, Thomas M.

    1979-01-01

    Sections address the RFP/IFB (Request for Proposals/Invitation for Bids) process and procedures for selecting the "best" contract. In reviewing the federal procurement code, and the recent decision of the Government Accounting Office, particularly regarding the NIMIS (National Instructional Materials Information System contract), inconsistencies…

  2. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES... meet the requirement that renewable agricultural materials or forestry materials in such product must...

  3. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES... meet the requirement that renewable agricultural materials or forestry materials in such product must...

  4. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  5. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... agreement (PLA), as they may decide appropriate, on large-scale construction projects, where the total cost... procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor organizations that... the use of a project labor agreement (PLA), as they may decide appropriate, on large-scale...

  6. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  7. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  8. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  9. 40 CFR 33.301 - What does this subpart require?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  10. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  11. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  12. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  13. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  14. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  15. Engineering design of a high-temperature superconductor current lead

    NASA Astrophysics Data System (ADS)

    Niemann, R. C.; Cha, Y. S.; Hull, J. R.; Daugherty, M. A.; Buckles, W. E.

    As part of the US Department of Energy's Superconductivity Pilot Center Program, Argonne National Laboratory and Superconductivity, Inc., are developing high-temperature superconductor (HTS) current leads suitable for application to superconducting magnetic energy storage systems. The principal objective of the development program is to design, construct, and evaluate the performance of HTS current leads suitable for near-term applications. Supporting objectives are to (1) develop performance criteria; (2) develop a detailed design; (3) analyze performance; (4) gain manufacturing experience in the areas of materials and components procurement, fabrication and assembly, quality assurance, and cost; (5) measure performance of critical components and the overall assembly; (6) identify design uncertainties and develop a program for their study; and (7) develop application-acceptance criteria.

  16. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Materials and supplies. 140.908 Section 140.908 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if...

  17. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Materials and supplies. 140.908 Section 140.908 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if...

  18. United States Special Operations Command (USSOCOM): Construction Management Handbook

    DTIC Science & Technology

    2010-02-11

    installation B-Hut Road Work Sea-Hut Water Well and Pump House Brick and Mortar billets D. Oversight Program Oversight of contracts is critical to the...often asked to fulfill construction requirements in austere locations with little or no training in construction terminology, concepts, and protocols...contracting arm of SOAL is the Director of Procurement (also known as SOAL-K), located within the USSOCOM Headquarters on MacDill AFB, Florida. SOAL-K

  19. Procurement of Library Materials in the Federal Government; An Orientation Aid Prepared for the Federal Library Committee.

    ERIC Educational Resources Information Center

    Falk, Leslie K.

    This handbook is designed primarily as a general orientation aid, not an operation manual. It presents the background (mainly regulatory) of Federal procurement work, details, devices and tactics found to be successful, and calls attention to special sources of supply. Although planned as an aid for librarians who are engaged in Federal…

  20. Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edmondson, Philip D.

    2017-03-01

    This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-qualitymore » in situ experiments to be conducted on irradiated materials.« less

  1. Construction Quality Assurance Act of 2011

    THOMAS, 112th Congress

    Rep. Maloney, Carolyn B. [D-NY-14

    2011-05-05

    House - 05/13/2011 Referred to the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform . (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  2. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Audette, L.G.

    As originally conceived, the project called for modification of existing, commercially available stoker components. We experienced substantial delays in procurement, caused by supply backlogs and a major fire at the plant which ultimately provided the main stoker frame. Added to the problems was the bankruptcy of the L.W. Gay Stoveworks, where the project was to be located. Ultimately, parts were assembled and a combustion chamber was constructed at the Leyden Energy Corporation of Shelburne Falls, Massachusetts. A firing chamber with provision for measuring various physical and combustion parameters was constructed. The stoker, with appropriate modifications, was installed. Combustion analysis equipmentmore » was procured, and coal and wood pellets were stoked in order to test the effectiveness of the modifications. This report describes the configuration of the demonstration stoker and its modifications, as well as the testing exercise performed over the course of the project. 10 figs.« less

  4. 7 CFR 3201.63 - Bioremediation materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Bioremediation materials. 3201.63 Section 3201.63... Designated Items § 3201.63 Bioremediation materials. (a) Definition. Dry or liquid solutions (including those... with this part, will give a procurement preference for qualifying biobased bioremediation materials. By...

  5. 7 CFR 3201.63 - Bioremediation materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Bioremediation materials. 3201.63 Section 3201.63... Designated Items § 3201.63 Bioremediation materials. (a) Definition. Dry or liquid solutions (including those... with this part, will give a procurement preference for qualifying biobased bioremediation materials. By...

  6. 7 CFR 3201.63 - Bioremediation materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Bioremediation materials. 3201.63 Section 3201.63... Designated Items § 3201.63 Bioremediation materials. (a) Definition. Dry or liquid solutions (including those... with this part, will give a procurement preference for qualifying biobased bioremediation materials. By...

  7. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  8. Evaluation of the towplow for Caltrans operations.

    DOT National Transportation Integrated Search

    2015-09-30

    Caltrans requested that the Advanced Highway Maintenance and Construction Technology Research Center (AHMCT) research center configure, procure, and deploy two Viking-Cives TowPlow systems and conduct an extensive evaluation to determine the most ben...

  9. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  10. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  11. 40 CFR 35.936 - Procurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... engineering services as defined in § 35.937 and construction contracts as described in § 35.938 by grantees... does not apply to work beyond the scope of the project for which grant assistance is awarded (i.e...

  12. Study of materials for space processing. [with emphasis on crystal growth

    NASA Technical Reports Server (NTRS)

    Lal, R. B.

    1974-01-01

    A handbook is presented of materials feasible for growth in space in future NASA Missions. Major emphasis was placed on a literature survey concerned with promising materials. Equipment for resistivity and hall effect set-up was procured.

  13. Military handbook: Metallic materials and elements for aerospace vehicle structures, volume 1

    NASA Astrophysics Data System (ADS)

    1994-11-01

    Since many aerospace companies manufacture both commercial and military products, the standardization of metallic materials design data, which are acceptable to government procuring or certification agencies, is very beneficial to those manufacturers as well as governmental agencies. Although the design requirements for military and commercial products may differ greatly, the required design values for the strength of materials and elements and other needed material characteristics are often identical. Therefore this publication is to provide standardized design values and related design information for metallic materials and structural elements used in aerospace structures. The data contained herein or from approved items in the minutes of MIL-RDBK-5 coordination meetings are acceptable to the Air Force, the Navy, the Army, and the Federal Aviation Administration. Approval by the procuring or certificating agency must be obtained for the use of design values for products not contained herein.

  14. Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

    NASA Astrophysics Data System (ADS)

    Rani, Hafnidar A.

    2016-11-01

    The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.

  15. Public procurement of health technologies in Greece in an era of economic crisis.

    PubMed

    Kastanioti, Catherine; Kontodimopoulos, Nick; Stasinopoulos, Dionysis; Kapetaneas, Nikolaos; Polyzos, Nikolaos

    2013-01-01

    Public procurement is generally an important sector of the economy and, in most countries, is controlled by the introduction of regulatory and policy mechanisms. In the Greek healthcare sector, recent legislation redefined centralized procurement through the reestablishment of a state Health Procurement Committee (EPY), with an aim to formulate a plan to reduce procurement costs of medical devices and pharmaceuticals, improve payment time, make uniform medical requests, transfer redundant materials from one hospital to another and improve management of expired products. The efforts described in this paper began in early 2010, under the co-ordination of the Ministry of Health (MoH) and with the collaboration of senior staff from the International Monetary Fund (IMF), the European Commission (EC) and the European Central Bank (ECB). The procurement practices and policies set forth by EPY and the first measurable outcomes, in terms of cost savings, resulting from these policies are presented. The importance of these measures is discussed in light of the worst economic crisis faced by Greece since the restoration of democracy in 1974, as a result of both the world financial crisis and uncontrolled government spending. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  16. Tank farms pump critical characteristic and specification guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Titzler, P.A.

    The Design Authority group for Tank Farms, in conjunction with the Construction Projects organization, have recognized that there is a need to provide consistency in the procurement and testing of pumps and to assure that known critical attributes and features are included with each pump order as well as to reduce potential confusion by pump suppliers. As a result, a panel of pump experts representing Lockheed Martin Hanford Company (LMHC), Fluor Daniel Northwest (FDNW), Numatec Hanford Corporation (NHC), SGN Eurisys Services Corporation (SESC), and ARES Corporation has been assembled to prepare a guide for pump specifications. This document contains themore » consensus listing of critical characteristics and procurement recommendations of the panel. It is intended to be used as a guide for future pump procurement activities. If followed, it will help reduce cleanup costs at the Hanford Site and promote prompt approval of pumping system designs and procurement specifications. Alternate criteria may be specified on a case by case basis if deviation from the requirements contained herein is merited due to special circumstances.« less

  17. Early procurement of scarlet macaws and the emergence of social complexity in Chaco Canyon, NM.

    PubMed

    Watson, Adam S; Plog, Stephen; Culleton, Brendan J; Gilman, Patricia A; LeBlanc, Steven A; Whiteley, Peter M; Claramunt, Santiago; Kennett, Douglas J

    2015-07-07

    High-precision accelerator mass spectrometer (AMS) (14)C dates of scarlet macaw (Ara macao) skeletal remains provide the first direct evidence from Chaco Canyon in northwestern New Mexico that these Neotropical birds were procured from Mesoamerica by Pueblo people as early as ∼ A.D. 900-975. Chaco was a prominent prehistoric Pueblo center with a dense concentration of multistoried great houses constructed from the 9th through early 12th centuries. At the best known great house of Pueblo Bonito, unusual burial crypts and significant quantities of exotic and symbolically important materials, including scarlet macaws, turquoise, marine shell, and cacao, suggest societal complexity unprecedented elsewhere in the Puebloan world. Scarlet macaws are known markers of social and political status among the Pueblos. New AMS (14)C-dated scarlet macaw remains from Pueblo Bonito demonstrate that these birds were acquired persistently from Mesoamerica between A.D. 900 and 1150. Most of the macaws date before the hypothesized apogeal Chacoan period (A.D. 1040-1110) to which they are commonly attributed. The 10th century acquisition of these birds is consistent with the hypothesis that more formalized status hierarchies developed with significant connections to Mesoamerica before the post-A.D. 1040 architectural florescence in Chaco Canyon.

  18. Early procurement of scarlet macaws and the emergence of social complexity in Chaco Canyon, NM

    PubMed Central

    Watson, Adam S.; Plog, Stephen; Culleton, Brendan J.; Gilman, Patricia A.; LeBlanc, Steven A.; Whiteley, Peter M.; Claramunt, Santiago; Kennett, Douglas J.

    2015-01-01

    High-precision accelerator mass spectrometer (AMS) 14C dates of scarlet macaw (Ara macao) skeletal remains provide the first direct evidence from Chaco Canyon in northwestern New Mexico that these Neotropical birds were procured from Mesoamerica by Pueblo people as early as ∼A.D. 900–975. Chaco was a prominent prehistoric Pueblo center with a dense concentration of multistoried great houses constructed from the 9th through early 12th centuries. At the best known great house of Pueblo Bonito, unusual burial crypts and significant quantities of exotic and symbolically important materials, including scarlet macaws, turquoise, marine shell, and cacao, suggest societal complexity unprecedented elsewhere in the Puebloan world. Scarlet macaws are known markers of social and political status among the Pueblos. New AMS 14C-dated scarlet macaw remains from Pueblo Bonito demonstrate that these birds were acquired persistently from Mesoamerica between A.D. 900 and 1150. Most of the macaws date before the hypothesized apogeal Chacoan period (A.D. 1040–1110) to which they are commonly attributed. The 10th century acquisition of these birds is consistent with the hypothesis that more formalized status hierarchies developed with significant connections to Mesoamerica before the post-A.D. 1040 architectural florescence in Chaco Canyon. PMID:26100874

  19. NASA LaRC Hazardous Material Pharmacy

    NASA Technical Reports Server (NTRS)

    Esquenet, Remy

    1995-01-01

    In 1993-1994 the Office of Environmental Engineering contracted SAIC to develop NASA Langley's Pollution Prevention (P2) Program. One of the priority projects identified in this contract was the development of a hazardous waste minimization (HAZMIN)/hazardous materials reutilization (HAZMART) program in the form of a Hazardous Materials Pharmacy. A hazardous materials pharmacy is designed to reduce hazardous material procurement costs and hazardous waste disposal costs. This is accomplished through the collection and reissue of excess hazardous material. Currently, a rarely used hazardous material may be stored in a shop area, unused, until it passes its expiration date. The material is then usually disposed of as a hazardous waste, often at a greater expense than the original cost of the material. While this material was on the shelf expiring, other shop areas may have ordered new supplies of the same material. The hazardous material pharmacy would act as a clearinghouse for such materials. Material that is not going to be used would be turned in to the pharmacy. Other users could then be issued this material free of charge, thereby reducing procurement costs. The use of this material by another shop prevents it from expiring, thereby reducing hazardous waste disposal costs.

  20. 40 CFR 40.145-3 - Projects involving construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... competition. “Brand name or equal” description may be used as a means to define the performance or other salient requirements of a procurement, and when so used the specific features of the named brand which...

  1. Procurement engineering - the productivity factor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less

  2. A Study on Market-based Strategic Procurement Planning in Convergent Supply Networks

    NASA Astrophysics Data System (ADS)

    Opadiji, Jayeola Femi; Kaihara, Toshiya

    We present a market-based decentralized approach which uses a market-oriented programming algorithm to obtain Pareto-optimal allocation of resources traded among agents which represent enterprise units in a supply network. The proposed method divides the network into a series of Walrsian markets in order to obtain procurement budgets for enterprises in the network. An interaction protocol based on market value propagation is constructed to coordinate the flow of resources across the network layers. The method mitigates the effect of product complementarity in convergent network by allowing for enterprises to hold private valuations of resources in the markets.

  3. Determining the best forecasting method to estimate unitary charges price indexes of PFI data in central region Peninsular Malaysia

    NASA Astrophysics Data System (ADS)

    Ahmad Kamaruddin, Saadi Bin; Md Ghani, Nor Azura; Mohamed Ramli, Norazan

    2013-04-01

    The concept of Private Financial Initiative (PFI) has been implemented by many developed countries as an innovative way for the governments to improve future public service delivery and infrastructure procurement. However, the idea is just about to germinate in Malaysia and its success is still vague. The major phase that needs to be given main attention in this agenda is value for money whereby optimum efficiency and effectiveness of each expense is attained. Therefore, at the early stage of this study, estimating unitary charges or materials price indexes in each region in Malaysia was the key objective. This particular study aims to discover the best forecasting method to estimate unitary charges price indexes in construction industry by different regions in the central region of Peninsular Malaysia (Selangor, Federal Territory of Kuala Lumpur, Negeri Sembilan, and Melaka). The unitary charges indexes data used were from year 2002 to 2011 monthly data of different states in the central region Peninsular Malaysia, comprising price indexes of aggregate, sand, steel reinforcement, ready mix concrete, bricks and partition, roof material, floor and wall finishes, ceiling, plumbing materials, sanitary fittings, paint, glass, steel and metal sections, timber and plywood. At the end of the study, it was found that Backpropagation Neural Network with linear transfer function produced the most accurate and reliable results for estimating unitary charges price indexes in every states in central region Peninsular Malaysia based on the Root Mean Squared Errors, where the values for both estimation and evaluation sets were approximately zero and highly significant at p < 0.01. Therefore, artificial neural network is sufficient to forecast construction materials price indexes in Malaysia. The estimated price indexes of construction materials will contribute significantly to the value for money of PFI as well as towards Malaysian economical growth.

  4. Moving Equipment and Workers to Mine Construction Site at a Logistically Challenged Area

    NASA Astrophysics Data System (ADS)

    Tikasz, Laszlo; Biroscak, Dennis; Pentiah, Scheale Duvah; McCulloch, Robert I.

    Social sensitivity of habitants, minimal impact on the environment, low-grade infrastructure, high altitude, frequent rock slides combined with expectations for the timely moving of equipment and workers are some of the challenges emerging from the current construction of a mine. Starting with traditional planning, and experiencing issues in the early phase of the construction, a traffic simulator was requested by the Procurement Department in order to validate daily-weekly schedules and predict likely delays or blockages on the long-term.

  5. Materials data handbook: Aluminum alloy 6061

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for aluminum alloy 6061 is presented. The scope of the information includes physical and mechanical properties of the alloy at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy, corrosion, environmental effects, fabrication, and joining techniques is developed.

  6. Materials data handbook: Stainless steel type 301

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for stainless steel type 301 is presented. The scope of the information includes physical and mechanical properties at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and bonding is developed.

  7. Materials data handbook: Aluminum alloy 2219

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for aluminum 2219 alloy is presented. The scope of the information includes physical and mechanical properties at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and joining techniques is developed.

  8. Materials data handbook: Aluminum alloy 7075

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information on aluminum alloy 7075 is presented. The scope of the information includes physical and mechanical properties of the alloy at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy, corrosion, environmental effects, fabrication, and joining techniques is developed.

  9. Materials data handbook: Aluminum alloy 5456

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for aluminum alloy 5456 is presented. The scope of the information includes physical and mechanical property data at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and joining techniques is developed.

  10. Materials data handbook: Inconel alloy 718

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for Inconel alloy 718 is presented. The scope of the information includes physical and mechanical properties at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and joining techniques is developed.

  11. Photovoltaic balance-of-system designs and costs at PVUSA

    NASA Astrophysics Data System (ADS)

    Reyes, A. B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  12. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  13. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  14. Procurement Opportunitites in: Afghanistan and the Central Asian States (CAS)

    DTIC Science & Technology

    2012-08-01

    barriers) Furniture (office and household) Prefabricated Structures (CONEXs, containerized housing units, re-locatable buildings) Office Supplies... Concrete Foundation and Structure Road Support Activities Minor Building Renovation Water and Sewer Line and Related Construction Heavy and Civil

  15. Minority Business Enterprises and Woman Business Enterprises Grant Utilization

    EPA Pesticide Factsheets

    The policy goal of the MBE/WBE Programs is to assure that minority business enterprises and woman business enterprises are given the opportunity to participate in contract and procurement for supplies, construction, equipment & services under any EPA grant

  16. Materials data handbook: Stainless steel alloy A-286

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for stainless steel alloy A-286 is presented. The scope of the information includes physical and mechanical properties at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and bonding is developed.

  17. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2017-03-16

    principle reduce the cost of the weapons being procured in two primary ways:  Contractor optimization of workforce and production facilities. An...MYP contract gives the contractor (e.g., an airplane manufacturer or shipbuilder) confidence that a multiyear stream of business of a known volume...will very likely materialize. This confidence can permit the contractor to make investments in the firm’s workforce and production facilities that are

  18. 7 CFR 1724.70 - Standard forms of contracts for borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND... construction, procurement, engineering services, and architectural services financed by a loan made or... prescribes RUS procedures in promulgating electric program standard contract forms and identifies those forms...

  19. 77 FR 69627 - Information Collection; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... agencies to consider the use of a project labor agreement (PLA), as they may decide appropriate, on large... to promote economy and efficiency in Federal procurement. A PLA is a pre-hire collective bargaining...

  20. Materials data handbook. Titanium 6Al-4V

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A summary of the materials property information for Titanium 6Al-4V alloy is presented. The scope of the information includes physical and mechanical properties at cryogenic, ambient, and elevated temperatures. Information on material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication, and bonding is developed.

  1. Evaluation of critical indicators in the process of acquiring supplies and services LAC-UFPE

    NASA Astrophysics Data System (ADS)

    Caetano, V. F.; Ferreira, C. V.; dos Santos, M. J.; Honorato, F. A.

    2015-01-01

    In laboratories linked to public universities and accredited by the NBR ISO/IEC 17025, to meet efficiently item 4.6 (procurement of supplies and services) is a challenge that can be accomplished by programming based on historical purchases and services. In this study, we evaluated the critical procurement items to meet the quality management system of the LAC-UFPE: reagents, certified reference material, of equipment parts, maintenance and calibration of equipment and instruments. It was found that the most critical item is the certified reference material, the purchase or repair of which must be expedited within 125 days prior to the receipt to occur within the desired period.

  2. General Services Administration Streamlines the Procurement of Construction Services

    DTIC Science & Technology

    2010-05-01

    successful. The system must be changed to increase performance, and have a sustainable performance measurement system that results in an increase...currently employ, and what is needed to employ a sustainable performance measurement system that has accompanying increase in performance and value

  3. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  4. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  5. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  6. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  7. 7 CFR 1726.201 - Formal competitive bidding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Procurement Procedures § 1726.201 Formal... formal competitive bidding: (a) Selection of qualified bidders. The borrower (acting through its engineer... § 1726.23). (b) Invitations to bid. The borrower (acting through its engineer, if applicable) is...

  8. On the construction of a 2-metre mirror blank for the universal reflecting telescope in Tautenburg (German Title: Über die Fertigung eines 2-Meter-Spiegelträgers für das Universal-Spiegelteleskop in Tautenburg )

    NASA Astrophysics Data System (ADS)

    Lödel, Wolfgang

    The astronomers' desire to penetrate deeper into space transforms into a demand for larger telescopes. The primary mirror constitutes the main part of a reflecting telescope, and it determines all subsequent activities. Already in the 1930s activities existed in the Schott company to manufacture mirror blanks up to diameters of 2 metres, which could not be pursued because of political constraints. This ambitious goal was again picked up a few years after the war. At a time when the procurement of raw materials was extremely difficult, the glass workers of Schott in Jena attacked this large project. After some failures, a good mirror blank could be delivered to the Carl Zeiss Company in 1951 for further processing and for the construction of the first 2-metre reflecting telescope. From 1960 to 1986, this mirror made from optical glass ZK7 served its purpose at the Karl Schwarzschild Observatory in Tautenburg. lt was then replaced by a zero expansion glass ceramics mirror.

  9. Low-carbon building assessment and multi-scale input-output analysis

    NASA Astrophysics Data System (ADS)

    Chen, G. Q.; Chen, H.; Chen, Z. M.; Zhang, Bo; Shao, L.; Guo, S.; Zhou, S. Y.; Jiang, M. M.

    2011-01-01

    Presented as a low-carbon building evaluation framework in this paper are detailed carbon emission account procedures for the life cycle of buildings in terms of nine stages as building construction, fitment, outdoor facility construction, transportation, operation, waste treatment, property management, demolition, and disposal for buildings, supported by integrated carbon intensity databases based on multi-scale input-output analysis, essential for low-carbon planning, procurement and supply chain design, and logistics management.

  10. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-06-10

    Background, Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK...out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned for...concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less

  13. 41 CFR 101-25.103 - Promotional materials, trading stamps, or bonus goods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Promotional materials, trading stamps, or bonus goods. 101-25.103 Section 101-25.103 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103 Promotional materials, trading stamps, or bonus...

  14. Kentucky Virtual High School 2004/2005 Prerequisite and Course Materials List.

    ERIC Educational Resources Information Center

    Kentucky Department of Education, 2004

    2004-01-01

    This document is a compilation of Kentucky Virtual High School's (KVHS) 2004/2005 prerequisite and course materials listed by content area and subject and provides access information for KVHS's online professional development programs. After the Material and Textbook Procurement Policy, entries for the following KVHS course subject areas are…

  15. 41 CFR 101-25.103 - Promotional materials, trading stamps, or bonus goods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Promotional materials, trading stamps, or bonus goods. 101-25.103 Section 101-25.103 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103 Promotional materials, trading stamps, or bonus...

  16. 41 CFR 101-25.103 - Promotional materials, trading stamps, or bonus goods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Promotional materials, trading stamps, or bonus goods. 101-25.103 Section 101-25.103 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103 Promotional materials, trading stamps, or bonus...

  17. 41 CFR 101-25.103 - Promotional materials, trading stamps, or bonus goods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Promotional materials, trading stamps, or bonus goods. 101-25.103 Section 101-25.103 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103 Promotional materials, trading stamps, or bonus...

  18. 41 CFR 101-25.103 - Promotional materials, trading stamps, or bonus goods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Promotional materials, trading stamps, or bonus goods. 101-25.103 Section 101-25.103 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103 Promotional materials, trading stamps, or bonus...

  19. Facility design consideration for continuous mix production of class 1.3 propellant

    NASA Technical Reports Server (NTRS)

    Williamson, K. L.; Schirk, P. G.

    1994-01-01

    In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

  20. Procurement performance measurement system in the health care industry.

    PubMed

    Kumar, Arun; Ozdamar, Linet; Ng, Chai Peng

    2005-01-01

    The rising operating cost of providing healthcare is of concern to health care providers. As such, measurement of procurement performance will enable competitive advantage and provide a framework for continuous improvement. The objective of this paper is to develop a procurement performance measurement system. The paper reviews the existing literature in procurement performance measurement to identify the key areas of purchasing performance. By studying the three components in the supply chain collectively with the resources, procedures and output, a model is been developed. Additionally, a balanced scorecard is proposed by establishing a set of generic measures and six perspectives. A case study conducted at the Singapore Hospital applies the conceptual model to describe the purchasing department and the activities within and outside the department. The results indicate that the material management department has already made a good start in measuring the procurement process through the implementation of the balanced scorecard. There are many data that are collected but not properly collated and utilized. Areas lacking measurement include cycle time of delivery, order processing time, effectiveness, efficiency and reliability. Though a lot of hard work was involved, the advantages of establishing a measurement system outweigh the costs and efforts involved in its implementation. Results of balanced scorecard measurements provide decision-makers with critical information on efficiency and effectiveness of the purchasing department's work. The measurement model developed could be used for any hospital procurement system.

  1. State Requirements for Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document updates Florida's deregulation of construction of educational facilities guidelines, while keeping as the primary focus the safety of the students in pre-K through community college facilities. Organized by the sequence of steps required in the facilities procurement process, it covers general definitions, property…

  2. Association between Organ Procurement Organization Social Network Centrality and Kidney Discard and Transplant Outcomes1

    PubMed Central

    Butala, Neel M.; King, Marissa D.; Reitsma, William; Formica, Richard N.; Abt, Peter L.; Reese, Peter P.; Parikh, Chirag R.

    2015-01-01

    Background Given growth in kidney transplant waitlists and discard rates, donor kidney acceptance is an important problem. We used network analysis to examine whether organ procurement organization (OPO) network centrality affects discard and outcomes. Methods We identified 106,160 deceased-donor kidneys recovered for transplant from 2000–2010 in SRTR. We constructed the transplant network by year with each OPO representing a node and each kidney-sharing relationship between OPOs representing a directed tie between nodes. Primary exposures were the number of different OPOs to which an OPO has given a kidney or from which an OPO has received a kidney in year preceding procurement year. Primary outcomes were discard, cold-ischemia time, delayed graft function, and 1-year graft loss. We used multivariable regression, restricting analysis to the 50% of OPOs with highest discard and stratifying remaining OPOs by kidney volume. Models controlled for kidney donor risk index, waitlist time, and kidney pumping. Results An increase in one additional OPO to which a kidney was given by a procuring OPO in a year was associated with 1.4% lower likelihood of discard for a given kidney (odds ratio, 0.986; 95% confidence interval, 0.974-0.998) among OPOs procuring high kidney volume, but 2% higher likelihood of discard (OR:1.021, CI:1.006, 1.037) among OPOs procuring low kidney volume, with mixed associations with recipient outcomes. Conclusions Our study highlights the value of network analysis in revealing how broader kidney sharing is associated with levels of organ acceptance. We conclude interventions to promote broader inter-OPO sharing could be developed to reduce discard for a subset of OPOs. PMID:26102610

  3. 49 CFR 661.11 - Rolling stock procurements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... article, material, or supply, whether manufactured or unmanufactured, that is directly incorporated into... into a new and functionally different article. (f) Except as provided in paragraph (k) of this section, a subcomponent is any article, material, or supply, whether manufactured or unmanufactured, that is...

  4. 49 CFR 661.11 - Rolling stock procurements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... article, material, or supply, whether manufactured or unmanufactured, that is directly incorporated into... into a new and functionally different article. (f) Except as provided in paragraph (k) of this section, a subcomponent is any article, material, or supply, whether manufactured or unmanufactured, that is...

  5. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  6. The metaphysical basis of a liberal organ procurement policy.

    PubMed

    Hershenov, David B; Delaney, James J

    2010-08-01

    There remains a need to properly analyze the metaphysical assumptions underlying two organ procurement policies: presumed consent and organ sales. Our contention is that if one correctly understands the metaphysics of both the human body and material property, then it will turn out that while organ sales are illiberal, presumed consent is not. What we mean by illiberal includes violating rights of bodily integrity, property, or autonomy, as well as arguing for or against a policy in a manner that runs afoul of Rawlsian public reason.

  7. Marketing human organs: the autonomy paradox.

    PubMed

    Marshall, P A; Thomasma, D C; Daar, A S

    1996-03-01

    The severe shortage of organs for transplantation and the continual reluctance of the public to voluntarily donate has prompted consideration of alternative strategies for organ procurement. This paper explores the development of market approaches for procuring human organs for transplantation and considers the social and moral implications of organ donation as both a "gift of life" and a "commodity exchange." The problematic and paradoxical articulation of individual autonomy in relation to property rights and marketing human body parts is addressed. We argue that beliefs about proprietorship over human body parts and the capacity to provide consent for organ donation are culturally constructed. We contend that the political and economic framework of biomedicine, in western and non-western nations, influences access to transplantation technology and shapes the form and development of specific market approaches. Finally, we suggest that marketing approaches for organ procurement are and will be negotiated within cultural parameters constrained by several factors: beliefs about the physical body and personhood, religious traditions, economic conditions, and the availability of technological resources.

  8. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    ; Finance Templates Travel One-Stop Acknowledging MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Finance Templates Travel Facilities & Space Planning

  9. Stump Harvesting

    Treesearch

    Dana Mitchell

    2009-01-01

    Increased use of forest fuel requires larger and larger procurement areas. Inclusion of stump material within the shorter distances could make this unusual source of biomass more economical to harvest. Land clearing activities are also helping to raise interest in stump harvesting. Processing stump material for biomass is an alternative...

  10. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the employment of minorities and women and the utilization of MBE's and FBE's in the construction and... women, by each job group. (3) Goals should be set in proportion to the group's general availability in... dissemination of information on business opportunities and procurement practices to minority and women's...

  11. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  12. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  13. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  14. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  15. Department of the Army Justification of Estimates for Fiscal Year 1985. Procurement Appropriations-Construction Program Submitted to Congress February 1984. DD Forms 1391.

    DTIC Science & Technology

    1984-02-01

    REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth

  16. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  17. FRIB cryogenic system status

    NASA Astrophysics Data System (ADS)

    Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.

    2017-12-01

    Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.

  18. 49 CFR 700.2 - Organization and functioning of Amtrak.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., finance and treasurer, personnel, passenger and operating services, government affairs, operations and... presidents, such as corporate communications, safety, real estate, procurement, materials management, police...

  19. The optimal hormonal replacement modality selection for multiple organ procurement from brain-dead organ donors

    PubMed Central

    Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David KC

    2015-01-01

    The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu’s multiple comparisons with the best (MCB) – adapted from the Dunnett’s multiple comparisons with control (MCC) – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. PMID:25565890

  20. 40 CFR 247.11 - Vehicular products.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...

  1. 40 CFR 247.11 - Vehicular products.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...

  2. 40 CFR 247.11 - Vehicular products.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...

  3. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  4. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  5. 40 CFR 80.1352 - What are the pre-compliance reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Benzene concentration. An estimate of the average gasoline benzene concentration corresponding to the time... engineering and permitting, Procurement and Construction, and Commissioning and startup. (7) Basic information regarding the selected technology pathway for compliance (e.g., precursor re-routing or other technologies...

  6. 24 CFR 570.611 - Conflict of interest.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Conflict of interest. 570.611... § 570.611 Conflict of interest. (a) Applicability. (1) In the procurement of supplies, equipment, construction, and services by recipients and by subrecipients, the conflict of interest provisions in 24 CFR 85...

  7. 24 CFR 1003.606 - Conflict of interest.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Conflict of interest. 1003.606... Requirements § 1003.606 Conflict of interest. (a) Applicability. (1) In the procurement of supplies, equipment, construction, and services by grantees and subgrantees, the conflict of interest provisions in 24 CFR 85.36 and...

  8. 75 FR 59102 - Defense Federal Acquisition Regulation Supplement; Government-Assigned Serial Number Marking...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... requires agreement between the Government and contractor prior to use of the serial numbers in constructing... Parts 211 and 252 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations... revising the introductory text to read as follows: 252.211-7007 Reporting of Government-Furnished Equipment...

  9. 48 CFR 536.271 - Project labor agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... significant project means a Federal construction project with a total cost to the Federal Government of more... framework for labor-management cooperation to advance the Government's procurement interest in cost, efficiency, and quality. (d) Policy. (1) You may, on a project-by-project basis, use a PLA on a large and...

  10. 48 CFR 552.236-83 - Requirement for a Project Labor Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... interest and concern, including productivity, quality of work, safety, and health. (4) The PLA shall fully... cooperation to advance the Government's procurement interest in cost, efficiency, and quality. (b) The...]. The PLA binds the Contractor and subcontractors of whatever tier engaged in onsite construction work...

  11. FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Natesan, K.; Momozaki, Y.

    This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion,more » microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the information is being transmitted to the tank fabricator. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have demolished the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. Procurement of some of the long lead items such as valves, EM pumps, EM flowmeters, etc. is in progress and will continue in FY 2018. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and the associated loop without an operator for an extended period of time. With the three sodium loops (with single-tank, dual-tank and four–tanks), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.« less

  12. Applying value stream mapping techniques to eliminate non-value-added waste for the procurement of endovascular stents.

    PubMed

    Teichgräber, Ulf K; de Bucourt, Maximilian

    2012-01-01

    OJECTIVES: To eliminate non-value-adding (NVA) waste for the procurement of endovascular stents in interventional radiology services by applying value stream mapping (VSM). The Lean manufacturing technique was used to analyze the process of material and information flow currently required to direct endovascular stents from external suppliers to patients. Based on a decision point analysis for the procurement of stents in the hospital, a present state VSM was drawn. After assessment of the current status VSM and progressive elimination of unnecessary NVA waste, a future state VSM was drawn. The current state VSM demonstrated that out of 13 processes for the procurement of stents only 2 processes were value-adding. Out of the NVA processes 5 processes were unnecessary NVA activities, which could be eliminated. The decision point analysis demonstrated that the procurement of stents was mainly a forecast driven push system. The future state VSM applies a pull inventory control system to trigger the movement of a unit after withdrawal by using a consignment stock. VSM is a visualization tool for the supply chain and value stream, based on the Toyota Production System and greatly assists in successfully implementing a Lean system. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  13. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials and Biobased Products 23.404 Agency...

  14. 48 CFR 23.404 - Agency affirmative procurement programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials and Biobased Products 23.404 Agency...

  15. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    ; Finance Templates Travel One-Stop Acknowledging MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Finance Templates Travel Travel This page has been moved

  16. 48 CFR 9904.411 - Cost accounting standard-accounting for acquisition costs of material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-accounting for acquisition costs of material. 9904.411 Section 9904.411 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND...

  17. 10 CFR 33.15 - Requirements for the issuance of a Type C specific license of broad scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... bachelor level, or equivalent training and experience, in the physical or biological sciences or in..., radiation detection instrumentation, and biological hazards of exposure to radiation appropriate to the type... controls and provisions relating to procurement of byproduct material, procedures, record keeping, material...

  18. Special Inspector General for Iraq Reconstruction: Quarterly Report and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2007-07-30

    enacted November 14, 2005 • P.L. 109-148, Department of Defense, Emergency Supplemental Appropria- tions To Address Hurricanes in the Gulf of Mexico ...CEFMS IRRF NON- CONSTRUCTION THROUGH JUNE 2007 4256 W91GET-07-C-0301-NA-0001 FALCON SECURITY LTD *URI#27076* PROVIDE PERSONNEL ADN EQUIPMENT WITH... TUBERCULOSIS SCREENING EQUIPMENT FOR CTRS NC-EQUIPMENT PROCUREMENT AND MODERNIZATION NON-CONSTRUCTION $1,363,058.43 $1,363,058.43 $0.00 CEFMS IRRF NON

  19. Special Inspector General for Iraq Reconstruction. Quarterly and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2007-07-30

    of Mexico , and Pandemic Influenza Act, 2006, enacted December 30, 2005 • P.L. 109-234, The Emergency Supplemental Appropriations Act for Defense...1,561,750.00 $0.00 CEFMS IRRF NON- CONSTRUCTION THROUGH JUNE 2007 4256 W91GET-07-C-0301-NA-0001 FALCON SECURITY LTD *URI#27076* PROVIDE PERSONNEL ADN EQUIPMENT... TUBERCULOSIS SCREENING EQUIPMENT FOR CTRS NC-EQUIPMENT PROCUREMENT AND MODERNIZATION NON-CONSTRUCTION $1,363,058.43 $1,363,058.43 $0.00 CEFMS IRRF

  20. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-08-02

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs... NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am equally

  1. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-07-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs... NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am equally

  2. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-10-04

    Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...rework has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to construction of LPD 17 Class vessels.” • “I am

  3. Cell module and fuel conditioner development

    NASA Astrophysics Data System (ADS)

    Hoover, D. Q., Jr.

    1980-01-01

    Components for the first 5 cell stack (no cooling plates) of the MK-2 design were fabricated. Preliminary specfications and designs for the components of a 23 cell MK-1 stack with four DIGAS cooling plates were developed. The MK-2 was selected as a bench mark design and a preliminary design of the facilities required for high rate manufacture of fuel cell modules was developed. Two stands for testing 5 cell stacks were built and design work for modifying existing stands and building new stands for 23 and 80 cell stacks was initiated. Design and procurement of components and materials for the catalyst test stand were completed and construction initiated. Work on the specifications of pipeline gas, tap water and recovered water and definition of equipment required for treatment was initiated. An innovative geometry for the reformer was conceived and modifications of the computer program to be used in its design were stated.

  4. Calibration of a magnetic induction system for measurement of hypervelocities

    NASA Astrophysics Data System (ADS)

    Breeze, S. P.

    1993-03-01

    A device to measure the velocity and to determine the character of a material launched in a flight tube during the execution of an experiment has been constructed. This measurement device provides a self generating signal, is nonintrusive, compact, and accurate. The signals are reproducible, and it is relatively inexpensive to procure. The MAgnetic Velocity Induction System (MAVIS) has been the technique used to measure projectile velocities in the two-stage light gas gun at Sandia for many years. Several experiments were conducted to study the MAVIS data signatures produced by various metal projectiles at velocities raging from 0.8 km/sec to nearly 7.0 km/sec, as well as fragmented metal projectiles, and a highly conductive carbon plasma. This report deals with the results of those calibration experiments. The data signature study may be used as an aid in the interpretation of the other test data records.

  5. Outfit Planning

    DTIC Science & Technology

    1979-12-01

    ETC.ronments where, in most cases, it is difficult or time consum - ing to get tools and materials. The natural result is more lost-time accidents, increased...is already on-hand and the time consuming vendor-drawing approval cycle is eliminated from the pro- curement process. The flow of design information...SYSTEM/STAGE TO SPECIFICATION BY MATERIA !L/DELIVERY DATE - TO PLAN MATERIAL PROCUREMENT ON SCHEOULE - TO MINIMIZE ST0CKED MATERIAL MATERIAL CONTROL

  6. Knowledge about conception, sexual behavior, and procurement of abortion among female undergraduate students in a Nigerian university.

    PubMed

    Moronkola, O A; Amosu, A; Okonkwo, C

    Of 1,200 questionnaires administered in a cross-sectional study involving University of Ibadan female students, 1000 were found useable for data analysis. Analysis found that a majority of respondents (56.4%) had little knowledge about conception and frequently engaged in sexual intercourse for many reasons, including: to have fun; to show they were mature; and to seek material reward. Also, 61.1% had procured abortion before and most of them did not procure it from government-owned hospitals/clinics, which may likely make them prone to health consequences of unsafe abortion. Part of our recommendations are the need to introduce health education (incorporating sexuality education) into the General Studies Program of the university and that home training on aspects relating to sexuality education be given to and promoted among young people.

  7. 25 CFR 276.12 - Procurement standards.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the purchases of supplies or materials or articles ordinarily available on the open market, or... fields which directly concern public health, safety, or welfare; or constraints in the field of science...

  8. 25 CFR 276.12 - Procurement standards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the purchases of supplies or materials or articles ordinarily available on the open market, or... fields which directly concern public health, safety, or welfare; or constraints in the field of science...

  9. 25 CFR 276.12 - Procurement standards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the purchases of supplies or materials or articles ordinarily available on the open market, or... fields which directly concern public health, safety, or welfare; or constraints in the field of science...

  10. High Performance Residential Housing Units at U.S. Coast Guard Base Kodiak: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Romero, R.; Hickey, J.

    2013-10-01

    The United States Coast Guard (USCG) constructs residential housing throughout the country using a basic template that must meet the minimum Leadership in Energy and Environmental Design (LEED) Silver criteria or better for the units. In Kodiak, Alaska, USCG is procuring between 24 and 100 residential multi-family housing units. Priorities for the Kodiak project were to reduce overall energyconsumption by at least 20% over existing units, improve envelope construction, and evaluate space heating options. USCG is challenged with maintaining similar existing units that have complicated residential diesel boilers. Additionally, fuel and material costs are high in Kodiak. While USCG hasmore » worked to optimize the performance of the housing units with principles of improved buildingenvelope, the engineers realize there are still opportunities for improvement, especially within the heating, ventilation, and air conditioning (HVAC) system and different envelope measures. USCG staff also desires to balance higher upfront project costs for significantly reduced life-cycle costs of the residential units that have an expected lifetime of 50 or more years. To answer thesequestions, this analysis used the residential modeling tool BEoptE+ to examine potential energy- saving opportunities for the climate. The results suggest criteria for achieving optimized housing performance at the lowest cost. USCG will integrate the criteria into their procurement process. To achieve greater than 50% energy savings, USCG will need to specify full 2x 6 wood stud R-21 insulationwith two 2 inches of exterior foam, R-38 ceiling insulation or even wall insulation in the crawl space, and R-49 fiberglass batts in a the vented attic. The air barrier should be improved to ensure a tight envelope with minimal infiltration to the goal of 2.0 ACH50. With the implementation of an air source heat pump for space heating requirements, the combination of HVAC and envelope savings inthe residential unit can save up to 58% in source energy over existing residential units.« less

  11. Sharing University Intellectual Capital: The Role of Continuing Education

    ERIC Educational Resources Information Center

    O'Neill, Hugh

    2005-01-01

    New England's research universities are widely recognized as major contributors to the region's economy. In many of the communities in which they are located, they rank among the largest employers. They purchase goods and services from New England companies, and are often among the leading procurers of construction activity. Each year, they bring…

  12. EPA Form 5700‑52A: United States Environmental Protection Agency Minority Business Enterprise/Woman Business Enterprise Utilization under Federal Grants and Cooperative Agreements

    EPA Pesticide Factsheets

    MBE/WBE utilization is based on 40 CFR Part 33. EPA Form 5700-52A must be completed by recipients of Federal grants, cooperative agreements, or other Federal financial assistance which involve procurement of supplies, equipment, construction, etc.

  13. 45 CFR 1357.32 - State fiscal requirements (title IV-B, subpart 2, family preservation and family support services).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following: Procurement; payroll; personnel functions; management, maintenance and operation of space and... SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION... title IV-B may not be used for the purchase or construction of facilities. (f) Maintenance of effort...

  14. Study to develop improved fire resistant aircraft passenger seat materials, phase 1

    NASA Technical Reports Server (NTRS)

    Trabold, E. L.

    1977-01-01

    The procurement and testing of a wide range of candidate materials is reported. Improved fire resistant nonmetallic materials were subjected to tests to evaluate their thermal characteristics, such as burn, smoke generation, heat release rate and toxicity. In addition, candidate materials were evaluated for mechanical, physical and aesthetic properties. Other properties considered included safety, comfort, durability and maintainability. The fiscal year 1977 and the projected 1980 cost data were obtained for aircraft seat materials.

  15. Heuristic economic assessment of the Afghanistan construction materials sector: cement and dimension stone production

    USGS Publications Warehouse

    Mossotti, Victor G.

    2014-01-01

    Over the past decade, the U.S. Government has invested more than $106 billion for physical, societal, and governmental reconstruction assistance to Afghanistan (Special Inspector General for Afghanistan Reconstruction, 2012a). This funding, along with private investment, has stimulated a growing demand for particular industrial minerals and construction materials. In support of this effort, the U.S. Geological Survey released a preliminary mineral assessment in 2007 on selected Afghan nonfuel minerals (Peters and others, 2007). More recently, the 2007 mineral assessment was updated with the inclusion of a more extensive array of Afghan nonfuel minerals (Peters and others, 2011). As a follow-up on the 2011 assessment, this report provides an analysis of the current use and prospects of the following Afghan industrial minerals required to manufacture construction materials: clays of various types, bauxite, gypsum, cement-grade limestone, aggregate (sand and gravel), and dimension stone (sandstone, quartzite, granite, slate, limestone, travertine, marble). The intention of this paper is to assess the: Use of Afghan industrial minerals to manufacture construction materials, Prospects for growth in domestic construction materials production sectors, Factors controlling the competitiveness of domestic production relative to foreign imports of construction materials, and Feasibility of using natural gas as the prime source of thermal energy and for generating electrical energy for cement production. The discussion here is based on classical principles of supply and demand. Imbedded in these principles is an understanding that the attributes of supply and demand are highly variable. For construction materials, demand for a given product may depend on seasons of the year, location of construction sites, product delivery time, political factors, governmental regulations, cultural issues, price, and how essential a given product might be to the buyer. Moreover, failure on the supply side to mirror such attributes can be deal-breakers in a transaction. For qualitative interpretation of the findings in this report, the value chain was used to conceptualize the relation between supply and demand. Although quantitative data on the Afghan construction materials sector have been hard to come by, the premise herein was that qualitative aspects of supply and demand are revealed by following the flow of funding through projects of varying sizes. It was found that the spectrum of attributes on the demand side of large multimillion dollar reconstruction projects is generally high dimensional, distributed over a broad line of construction materials at diverse locations, and in varying quantities. As interpreted herein, project funds dispensed at the higher hierarchical levels of a project are often concentrated on procurement of construction materials and services at the upper end of the value chain. In contrast, project funds dispensed at the lower hierarchical levels are disseminated across a multiplicity of subprojects, thus restricting project acquisitions to the lower end of the value chain. Evidence suggests that under the current conditions in Afghanistan producers of construction materials at the lower end of the value chain (adobe brick, aggregate, low-end marble products) can successfully compete in local markets and turn a profit. In contrast, producers of energy-intensive products such as cement will continue to face intense competition from imports, at least in the near-term. In the long-term, as infrastructure issues are resolved, and as business conditions in Afghanistan improve, domestic producers will have a locational advantage in establishing a solid niche in their respective home markets. In the process of tendering properties for cement production, the pivotal issues of abundant, reliable, and cost-effective thermal and electrical energy sources for cement production have become prominent. Over the past 50 years, powdered coal and natural gas have been proven to be excellent fuels for firing kilns at cement plants, and both fuels are used as energy sources for electricity generation. After reviewing the main aspects of the coal and natural gas sectors, it is concluded here that the issues for plant design are not that of energy source feasibility but rather that of optimization of energy technologies for a given plant at a particular time and place, based on a diverse mix of energy and transport technologies.

  16. 48 CFR 908.7121 - Special materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reporting. (c) Lithium. Lithium is available from Y-12 at no cost other than normal packing, handling, and... procurement of lithium compounds from any other source. [77 FR 74387, Dec. 14, 2012] ...

  17. 48 CFR 908.7121 - Special materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reporting. (c) Lithium. Lithium is available from Y-12 at no cost other than normal packing, handling, and... procurement of lithium compounds from any other source. [77 FR 74387, Dec. 14, 2012] ...

  18. Operating Hours Based Inventory Management.

    DTIC Science & Technology

    1986-12-01

    forecasting can be based on the expert opinion. The Delphi technique is one such method of forecasting which uses a group of decision makers with a...errors occ.ur. If larce a’nounts of’ material are procured and warehoused, there could be a greater chance that the material will no longer be needed

  19. Surface electrical properties experiment study phase, volume 3

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.

  20. Operation HARDTACK. Phase 2

    DTIC Science & Technology

    1959-07-01

    Nevada Test Site. ditions, available equipment and material , and late criteria changes requesifd by the partici- "The Nevada tests will e held during...by visory personnel. H&N Field Engineers or the H&N Material TestsResident Engineer. The majority of material tests consisted of 3. Reports and...procurement of material and hol, date of request, date rquired, work to be equipment to be used in the test facilities pro- performed, and site or station

  1. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  2. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  3. 14 CFR 29.621 - Casting factors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  4. 14 CFR 27.621 - Casting factors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...

  5. An integrated production-inventory model for food products adopting a general raw material procurement policy

    NASA Astrophysics Data System (ADS)

    Fauza, G.; Prasetyo, H.; Amanto, B. S.

    2018-05-01

    Studies on an integrated production-inventory model for deteriorating items have been done extensively. Most of the studies define deterioration as physical depletion of some inventories over time. This definition may not represent the deterioration characteristics of food products. The quality of food production decreases over time while the quantity remains the same. Further, in the existing models, the raw material is replenished several times (or at least once) within one production cycle. In food industries, however, a food company, for several reasons (e.g., the seasonal raw materials, discounted price, etc.) sometimes will get more benefit if it orders raw materials in a large quantity. Considering this fact, this research, therefore, is aimed at developing a more representative inventory model by (i) considering the quality losses in food and (ii) adopting a general raw material procurement policy. A mathematical model is established to represent the proposed policy in which the total profit of the system is the objective function. To evaluate the performance of the model, a numerical test was conducted. The numerical test indicates that the developed model has better performance, i.e., the total profit is 2.3% higher compared to the existing model.

  6. Management of a Statewide Textbook and Materials Center for the Visually Impaired.

    ERIC Educational Resources Information Center

    Rossi, Peter

    1979-01-01

    The activities described include production and/or procurement of special media textbooks (tape, large print, and braille) and specialized equipment, as well as the administrative service function. (Author)

  7. 48 CFR 908.7121 - Special materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Lithium. Lithium is available at no cost other than normal packing, handling, and shipping charges from... to procurement of lithium compounds from any other source. [54 FR 27646, June 30, 1989, as amended at...

  8. 48 CFR 908.7121 - Special materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Lithium. Lithium is available at no cost other than normal packing, handling, and shipping charges from... to procurement of lithium compounds from any other source. [54 FR 27646, June 30, 1989, as amended at...

  9. 48 CFR 908.7121 - Special materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Lithium. Lithium is available at no cost other than normal packing, handling, and shipping charges from... to procurement of lithium compounds from any other source. [54 FR 27646, June 30, 1989, as amended at...

  10. Making the Case for a Model-Based Definition of Engineering Materials (Postprint)

    DTIC Science & Technology

    2017-09-12

    MBE relies on digi- tal representations, or a model-based definition (MBD), to define a product throughout design , manufacturing and sus- tainment...discovery through development, scale-up, product design and qualification, manufacture and sustainment have changed little over the past decades. This...testing data provided a certifiable material definition, so as to minimize risk and simplify procurement of materials during the design , manufacture , and

  11. Consumer mechatronics: a challenging playground for transducing materials and devices

    NASA Astrophysics Data System (ADS)

    Skjolstrup, Carl E.; Vonsild, Asbjorn L.

    2003-03-01

    The authors of this article are characterised by having a background within robotics technology, and have within the last 2-3 years moved into a material & process dominated environment. The authors are among other things responsible within LEGO Company; an internationally known toy developer and producer, for identification, prioritisation and procurement of new technological opportunities within materials, processes and devices providing new functionalities for the LEGO product.

  12. Characterization of ZrO2-Y2O3 thermal spray powder systems

    NASA Technical Reports Server (NTRS)

    Mantkowski, Thomas E.; Rigney, David V.; Froning, Marc J.; Jayaraman, N.

    1985-01-01

    The overall objective is to establish the interrelation between the raw material in the coating process and the performance of the coating deposit. It is anticipated that these interrelations will help establish more precise specifications for the procurement of the raw materials. Some of the preliminary results of the program are presented.

  13. Electrical Ground Support Equipment Fabrication, Specification for

    NASA Technical Reports Server (NTRS)

    Denson, Erik C.

    2014-01-01

    This document specifies parts, materials, and processes used in the fabrication, maintenance, repair, and procurement of electrical and electronic control and monitoring equipment associated with ground support equipment (GSE) at the Kennedy Space Center (KSC).

  14. 41 CFR 101-26.506-1 - Types of service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...

  15. Organ procurement organization compliance with 21 CFR 1271: a challenge for allogeneic pancreatic islet cell transplantation programs.

    PubMed

    Winters, J L; Tran, S A; Gastineau, D A; Padley, D J; Dean, P G; Kudva, Y C

    2009-06-01

    In order to protect tissue recipients, the Food and Drug Administration drafted Title 21, Section 1271 of the Code of Federal Regulations 1271 (21 CFR 1271) to address infectious disease risk. These regulations apply to tissues but not vascularized organs. Pancreatic islet cells are regulated under 21 CFR 1271. These regulations require qualification of suppliers of critical materials and services with regard to 21 CFR 1271 compliance. As part of supplier qualification, all organ procurement organizations (OPOs) in the United States were sent a questionnaire covering the key components of these regulations. Of the 57 OPOs, 29 (51%) were in compliance based upon survey results. Twelve (21%) were not compliant in one or more areas. All indicated plans to become compliant. The remaining 15 (27%) either failed or refused to complete the survey, some indicating 21 CFR 1271 did not apply to OPOs. Using 2006 data, OPOs compliant with 21 CFR 1271 recovered 50% of the organs procured in the United States. These findings represent a challenge for allogeneic islet cell transplant programs whose raw material must comply with 21 CFR 1271. OPOs should work toward understanding and complying with 21 CFR 1271. Regulatory agencies should work toward enhancing safety of the pancreas supply by facilitating compliance through harmonization of requirements.

  16. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  17. The Lower Tiers of the Space Transportation Industrial Base

    DOT National Transportation Integrated Search

    1995-08-01

    The U.S. space transportation industry includes large and small providers of subsystems, components, and materials in areas such as propulsion, avionics, guidance, and structures. For each dollar spent on the procurement of space transportation syste...

  18. Materials data handbook: Aluminum alloy 2014, 2nd edition

    NASA Technical Reports Server (NTRS)

    Muraca, R. F.; Whittick, J. S.

    1972-01-01

    A revised edition of the materials data handbook on the aluminum alloy 2014 is presented. The scope of the information presented includes physical and mechanical property data at cryogenic, ambient and elevated temperatures, supplemented with useful information in such areas as material procurement, metallurgy of the alloy, corrosion, environmental effects, fabrication and joining techniques. Design data are presented, as available, and these data are complemented with information on the typical behavior of the alloy.

  19. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  20. An Analytic Model for DoD Divestments

    DTIC Science & Technology

    2015-04-30

    Modernization (Research, Development, Test, & Evaluation [RDT&E], Procurement, Military Construction, Science , & Technology, and Weapons Acquisition), and...from the insurance industry as variables that impact actuarial calculations are also worth considering here. For example, as the insurer of national...initiatives (GAO-14-134). Washington, DC: Author. Hardin, G. (1968). The tragedy of the commons. Science , 162, 1243–1248. Harrison, T. (2012, August

  1. 76 FR 68027 - Federal Acquisition Regulation; Certification Requirement and Procurement Prohibition Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    .... Applicability to Construction Comment: One respondent was concerned that the prescription at FAR 25.1103, which.... 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c). 0 2. Amend section 25.1103 by revising paragraph (e) to read as follows: 25.1103 Other provisions and clauses. * * * * * (e) The contracting officer...

  2. Pavement marking demonstration projects : state of Alaska and state of Tennessee.

    DOT National Transportation Integrated Search

    2013-11-01

    This project evaluates the safety impacts, environmental impacts, and cost effectiveness of different pavement marking : systems as well as the effect of State bidding and procurement processes on the quality of pavement marking material : employed i...

  3. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & ; Finance Templates Travel One-Stop Acknowledging MSD Support Human Resources Facilities & Space Operations For information regarding Human Resources, procedures for acknowledging MSD support, division

  4. Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils

    NASA Astrophysics Data System (ADS)

    Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.

    2017-04-01

    The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.

  5. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  6. On development of an inexpensive, lightweight thermal micrometeroid garment for space suits

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A lightweight and inexpensive coverlayer developed for space suits is described. Material selection, procurement, and testing, pattern design, and prototype fabrication are discussed. By using the minimum required cross section necessary for earth orbital mission, by utilizing the lightest weight materials possible, and by decreasing the use of weight costly taping a lightweight and economical thermal micrometeroid garment was developed. Simplification of manufacturing techniques and use of off-the-shelf materials helped to reduce costs.

  7. Building Evidence for Health: Green Buildings, Current Science, and Future Challenges.

    PubMed

    Cedeño-Laurent, J G; Williams, A; MacNaughton, P; Cao, X; Eitland, E; Spengler, J; Allen, J

    2018-04-01

    Civilizational challenges have questioned the status quo of energy and material consumption by humans. From the built environment perspective, a response to these challenges was the creation of green buildings. Although the revolutionary capacity of the green building movement has elevated the expectations of new commercial construction, its rate of implementation has secluded the majority of the population from its benefits. Beyond reductions in energy usage and increases in market value, the main strength of green buildings may be the procurement of healthier building environments. Further pursuing the right to healthy indoor environments could help the green building movement to attain its full potential as a transformational public health tool. On the basis of 40 years of research on indoor environmental quality, we present a summary of nine environment elements that are foundational to human health. We posit the role of green buildings as a critical research platform within a novel sustainability framework based on social-environmental capital assets.

  8. The NASA Langley building solar project and the supporting Lewis solar technology program

    NASA Technical Reports Server (NTRS)

    Ragsdale, R. G.; Namkoong, D.

    1974-01-01

    The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

  9. Weld procedure produces quality welds for thick sections of Hastelloy-X

    NASA Technical Reports Server (NTRS)

    Flens, F. J.; Fletcher, C. W.; Glasier, L. F., Jr.

    1967-01-01

    Welding program produces premium quality, multipass welds in heavy tube sections of Hastelloy-X. It develops semiautomatic tungsten/inert gas procedures, weld wire procurement specifications material weld properties, welder-operator training, and nondestructive testing inspection techniques and procedures.

  10. 34 CFR 5.72 - Records available.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department or not. (c) Contracts. (1) Contract instruments. (2) Portions of offers reflecting final prices submitted in negotiated procurements. (d) Reports on grantee, contractor, or provider performance. Final... projects, such as films, computer software, other copyrightable materials and reports of inventions, will...

  11. 7 CFR 2.90 - Chief Financial Officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., documents, papers, recommendations, or other material that are the property of the Department or that are... under any other law to records, reports, audits, reviews, documents, papers, recommendations, or other... perform such services; and (ii) Procurement, property management, space management, communications...

  12. 7 CFR 2.90 - Chief Financial Officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., documents, papers, recommendations, or other material that are the property of the Department or that are... under any other law to records, reports, audits, reviews, documents, papers, recommendations, or other... perform such services; and (ii) Procurement, property management, space management, communications...

  13. 7 CFR 2.90 - Chief Financial Officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., documents, papers, recommendations, or other material that are the property of the Department or that are... under any other law to records, reports, audits, reviews, documents, papers, recommendations, or other... perform such services; and (ii) Procurement, property management, space management, communications...

  14. 7 CFR 2.90 - Chief Financial Officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., documents, papers, recommendations, or other material that are the property of the Department or that are... under any other law to records, reports, audits, reviews, documents, papers, recommendations, or other... perform such services; and (ii) Procurement, property management, space management, communications...

  15. 40 CFR 247.5 - Specifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Specifications. 247.5 Section 247.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.5 Specifications. (a) RCRA section 6002...

  16. 40 CFR 247.4 - Contracting officer requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Contracting officer requirements. 247.4 Section 247.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.4 Contracting...

  17. 40 CFR 247.13 - Transportation products.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Transportation products. 247.13... COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.13 Transportation products. (a) Traffic barricades and traffic cones used in controlling or restricting vehicular...

  18. Superconducting cavity material for the European XFEL

    NASA Astrophysics Data System (ADS)

    Singer, W.; Singer, X.; Brinkmann, A.; Iversen, J.; Matheisen, A.; Navitski, A.; Tamashevich, Y.; Michelato, P.; Monaco, L.

    2015-08-01

    Analysis of the strategy for superconducting cavity material procurement and quality management is done on the basis of the experience with the cavity production for the European x-ray free electron laser (EXFEL) facility. An adjustment of the material specification to EXFEL requirements, procurement of material, quality control (QC), documentation, and shipment to cavity producers have been worked out and carried out by DESY. A multistep process of qualification of the material suppliers included detailed material testing, single- and nine-cell cavity fabrication, and cryogenic radiofrequency tests. Production of about 25 000 semi-finished parts of high purity niobium and niobium-titanium alloy in a period of three years has been divided finally between companies Heraeus, Tokyo Denkai, Ningxia OTIC, and PLANSEE. Consideration of large-grain (LG) material as a possible option for the EXFEL has resulted in the production of one cryogenic module consisting of seven (out of eight) LG cavities. LG materials fulfilled the EXFEL requirements and showed even 25% to 30% higher unloaded quality factor. A possible shortage of the required quantity of LG material on the market led, however, to the choice of conventional fine-grain (FG) material. Eddy-current scanning (ECS) has been applied as an additional QC tool for the niobium sheets and contributed significantly to the material qualification and sorting. Two percent of the sheets have been rejected, which potentially could affect up to one-third of the cavities. The main imperfections and defects in the rejected sheets have been analyzed. Samples containing foreign material inclusions have been extracted from the sheets and electrochemically polished. Some inclusions remained even after 150 μm surface layer removal. Indications of foreign material inclusions have been found in the industrially fabricated and treated cavities and a deeper analysis of the defects has been performed.

  19. Welding consumable selection for cryogenic (4{degrees}K) application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kane, S.F.; Siewert, T.A.

    1994-12-31

    Brookhaven National Laboratory (BNL) has begun construction of a large (3.8 kilometer circumference) heavy ion collider for the Department of Energy. The collider uses superconducting magnets, operating at 4{degrees}K in supercritical helium, which meets the definition of a pressure vessel. The ASME Boiler & Pressure Vessel Code grants an exemption from impact testing to certain metals, but only for operating temperatures down to 20{degrees}K. Research and the latest change to ASTM Standard E23 have invalidated Charpy testing at 4{degrees}K, thus compliance with the Code is not possible. This effort was undertaken to identify the weld process and weld material necessarymore » to comply with the intent of the Code (impact test) requirements, that is, to design a weld joint that will assure adequate fracture toughness. We will report the results of this development and testing, and conclude that nitrogen and maganese enhanced 385L provides a superior weld metal for 4{degrees}K cryogenic applications without the exaggerated purity concerns normally associated with superaustenitic weld materials. This development has been so successful that BNL has procured 15,000 pounds of this material for magnet production. Oxygen content, manifested as inclusion density, has the single most significant effect upon fracture toughness and impact strength. Finally, we report that GMAW is a viable welding process, using off-the-shelf equipment, for 4{degrees}K cryogenic applications.« less

  20. ITER Construction—Plant System Integration

    NASA Astrophysics Data System (ADS)

    Tada, E.; Matsuda, S.

    2009-02-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  1. A commercial project for private investments. Update of the 280 MW api Energia IGCC plant construction in central Italy.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Bravo, R.; Pinacci, P.; Trifilo, R.

    1998-07-01

    This paper has the aim to give a general overview of the api Energia IGCC project starting from the project background in 1992 and ending with the progress of construction. api Energia S.p.A., a joint VENTURE between api anonima petroli italiana S.p.A., Roma, Italy (51%), ABB Sae Sadelmi S.p.A., Milano, Italy (25%) and Texaco Development Corporation (24%), is building a 280 MW Integrated Gasification Combined Cycle plant in the api refinery at Falconara Marittima, on Italy' s Adriatic coast, using heavy oil residues. The plant is based on the modern concept of employing a highly efficient combined cycle power plantmore » fed with a low heating value fuel gas produced by gasifying heavy refinery residues. This scheme provides consistent advantages in terms of efficiency and environmental impact over alternative applications of the refinery residues. The electric power produced will feed the national grid. The project has been financed using the ``project financing'' scheme: over 1,000 billion Lira, representing 75% of the overall capital requirement, have been provided by a pool of international banks. In November 1996 the project reached financial closure and immediately after the detailed design and procurement activities started. Engineering, Procurement and Construction activities, carried out by a Consortium of companies of the ABB group, are totally in line with the schedule. Commercial operation of the plant, is scheduled for November 1999.« less

  2. Title I preliminary engineering for: A. S. E. F. solid waste to methane gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-01-01

    An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less

  3. 41 CFR 101-27.207 - Control and inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Control and inspection... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.207 Control and inspection. ...

  4. Artful Dodges Principals Use to Beat Bureaucracy.

    ERIC Educational Resources Information Center

    Ficklen, Ellen

    1982-01-01

    A study of Chicago (Illinois) principals revealed many ways principals practiced "creative insubordination"--avoiding following instructions but still getting things done. Among the dodges are deliberately missing deadlines, following orders literally, ignoring channels to procure teachers or materials, and using community members to…

  5. 40 CFR 31.36 - Procurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conflict of interest, real or apparent, would be involved. Such a conflict would arise when: (i) The... provide additional prohibitions relative to real, apparent, or potential conflicts of interest. (4... use time and material type contracts only— (i) After a determination that no other contract is...

  6. The cost risk implementation on design-build project of integrated public spaces child friendly in capital of Jakarta

    NASA Astrophysics Data System (ADS)

    Mardiaman, Mubarok, Abdul

    2017-11-01

    Jakarta area of 662.33 km2 with a population of 10,075,030 inhabitants and green open spaces 9.98%. The Jakarta government built a child-friendly integrated open space as facilities for playing. Providing of facilities was hoped suitable with time, cost, quality, accountability and proper financial governance. Based on the PU ministerial regulation number 19/PRT/M/2015 on the standards and guidelines for procurement the design and construction work on the integrated build and the PU ministerial regulation No. 07/PRT/M/2011 on standards and guidelines for procurement of construction works and consulting services of public works and the ministry of housing. RPTRA development at 123 locations in Jakarta was implemented base on the contract of design and build. The design study was influenced by the cost elements; the main strength (expert), skilled personnel, support personnel, major equipment and support. The construction fee relies on; expert implementation, hardware implementation, preparation work, land, buildings, courtyards, fences, complementary and governance capabilities for human resources in completing the construction activities to minimize the cost risk. Montecarlo simulations was conducted to determine the average unit price, model and analyze systems. In the cost contract, the percentage of design work stipulated 2.5%, build 97.5%. Base on regulation the minister of public work for design work cost 2.72%, build 97.28%. Then, actual cost for design 2.67% and build 97.33%. From the three reference was shown that there are differentiation one another. The acceleration of planning able to make the cost and time more efficient that impact on the implementation margin.

  7. Strategies for Dealing with the Defense Budget

    DTIC Science & Technology

    1983-08-17

    changes were computed and are shown in Tables B-3 and B-4, on pages B-66 and B-67. B.6 ACQUISITION PROGRAM TURBULENCE The purpose of this section is to...planning. The following brief overviev / of the NAVMAT study illustrates this cause of program turbulence. Figure C-13 shows the NAVMAT analytical...Inflation, Industrial Base, Life-Cycle Costs, Material Acquisition, Material Balance, Multi-year Contracting/procurement, Planning, Programming and

  8. Direct procurement of wound management products.

    PubMed

    Jenkins, Trevor

    2014-03-01

    This article describes a collaborative project between Bedfordshire Community Health Services and Primary Care Trusts/Clinical Commissioning Groups to improve provision of dressings to nurses for the patients they treat. Commissioners have facilitated a transformational approach and encouraged development of efficient systems of increased cost-effectiveness rather than a transactional approach based on opportunistic cost improvement plans. Reconfiguration to direct procurement from GP prescribing has reduced wastage, released nurse time from processes to spend on clinical contact time with patients, increased efficiency, and reduced prescription workload for GPs, all without adverse effects on expenditure. Establishing a wound care products formulary placed control under the nurses treating patients and facilitated decision-making based on cost-effectiveness in clinical use. Nurses now manage 60% of expenditure in the local community health economy, and this is increasing. Relationships with the dressings manufacturing industry have also changed in a positive, constructive direction.

  9. A Curriculum for Purchasing.

    ERIC Educational Resources Information Center

    Pinkerton, Richard LaDoyt

    The objective of this research was to identify the necessary educational organization required to form a curriculum plan for the field of purchasing and to investigate the nature of the industrial purchasing function. The dissertation delineates the critical areas of business operation: industrial purchasing, procurement, and material management.…

  10. 40 CFR 247.14 - Park and recreation products.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Park and recreation products. 247.14 Section 247.14 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.14 Park...

  11. 40 CFR 247.7 - Effective date.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Effective date. 247.7 Section 247.7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.7 Effective date. Within one year after...

  12. Benchmarking organ procurement organizations: a national study.

    PubMed Central

    Ozcan, Y A; Begun, J W; McKinney, M M

    1999-01-01

    OBJECTIVE: An exploratory examination of the technical efficiency of organ procurement organizations (OPOs) relative to optimal patterns of production in the population of OPOs in the United States. DATA SOURCES: A composite data set with the OPO as the unit of analysis, constructed from a 1995 national survey of OPOs (n = 64), plus secondary data from the Association of Organ Procurement Organizations and the United Network for Organ Sharing. STUDY DESIGN: The study uses data envelopment analysis (DEA) to evaluate the technical efficiency of all OPOs. PRINCIPAL FINDINGS: Overall, six of the 22 larger OPOs (27 percent) are classified as inefficient, while 23 of the 42 smaller OPOs (55 percent) are classified as inefficient. Efficient OPOs recover significantly more kidneys and extrarenal organs; have higher operating expenses; and have more referrals, donors, extrarenal transplants, and kidney transplants. The quantities of hospital development personnel and other personnel, and formalization of hospital development activities in both small and large OPOs, do not significantly differ. CONCLUSIONS: Indications that larger OPOs are able to operate more efficiently relative to their peers suggest that smaller OPOs are more likely to benefit from technical assistance. More detailed information on the activities of OPO staff would help pinpoint activities that can increase OPO efficiency and referrals, and potentially improve outcomes for large numbers of patients awaiting transplants. PMID:10536974

  13. Special Operations Forces: Opportunities Exist to Improve Transparency of Funding and Assess Potential to Lessen Some Deployments

    DTIC Science & Technology

    2015-07-01

    pace of special operations deployments, but opportunities may exist to better balance the workload across the joint force because activities...executes funding in operation and maintenance; procurement; research , development, test, and evaluation; and military construction accounts.13 SOCOM...regional awareness. Moreover, officials noted that increases in civilian positions were driven partly by DOD’s attempts to rebalance workload and become a

  14. Department of the Army Justification of Estimates for Fiscal Years 1988/1989. Procurement/Appropriations-Construction Program Submitted to Congress.

    DTIC Science & Technology

    1987-01-01

    e4run stoag :ahbl’ -ss to -ervice the, IDS equipment a-nd1 tho liFr . F)- fencing ;haill bo prov.id-d iroun,! the IDS area with necessary gats nd roa1d I...will provide enhanced and expanded capabilities. The EMCS (with 2,000 points) will control package boilers at 24 locations, one furnace, chiller

  15. A Systems Approach to Military Construction.

    DTIC Science & Technology

    1982-11-01

    Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a

  16. Stakeholder Alignment for Requirements in GEOValue

    NASA Astrophysics Data System (ADS)

    Cutcher-Gershenfeld, J.; King, J. L.

    2016-12-01

    Observation systems that collect information on environmental parameters relevant to biological and physical earth resources provide value. This has been demonstrated so many times in so many ways that it is not worth deliberating. Earlier projects for research (whether it is possible to do this or that), or for "dual use," typically involving defense, have been successful. Wealthy parties have built their own systems. Less wealthy parties seek to sustain the systems they have built. The history of systems suggests that "requirements" will be the next step. The objective is to maximize the "return" on the substantial investment required for construction, deployment, maintenance and renewal of observation systems. Stakeholders and their interests are assessed to construct the requirements from which specifications are built. Specifications drive procurement, and procurement produces built systems. Complicated (e.g. space-based) systems have long times between requirements analysis and deployment. It all depends on getting the requirements right, which depends on understanding stakeholders and requirements. And this is where things get complicated. Stakeholders and interests change, sometimes rapidly, as what is possible is altered. It becomes increasingly difficult to achieve stakeholder alignment required for effective management of constituent politics at the heart of any expensive endeavor. This paper presents results from a major study of stakeholder alignment in the Earth Sciences, focused especially on EarthCube.

  17. Variable Cost to Procure

    DTIC Science & Technology

    1981-03-12

    Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination

  18. Dependence and power in healthcare equipment supply chains.

    PubMed

    de Jong, Jurriaan L; Benton, W C

    2018-03-05

    Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.

  19. Berkeley Lab - Materials Sciences Division

    Science.gov Websites

    MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & , Travel, Property Rosemary Williams, Purchasing & Time Keeper 510-495-2645 66-238 rmwilliams@lbl.gov Jasmine Harris, Travel & Property 510-486-6303 66-237 jaharris@lbl.gov Gil Torres, Building Manager

  20. West Valley College Vocational and Technical Advisory Committees.

    ERIC Educational Resources Information Center

    West Valley Coll., Saratoga, CA.

    This brochure describes junior college advisory committees as groups of persons who represent industry and assist in organizing curriculum, advise on material procurement, keep the college current on industry practices, coordinate programs with the community, assist in student selection, guide instructors, provide moral support and public…

  1. 41 CFR 101-27.208 - Inventory analyses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Inventory analyses. 101... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.208 Inventory analyses. (a) An inventory analysis shall be...

  2. 40 CFR 247.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Purpose and scope. 247.1 Section 247.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES COMPREHENSIVE PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS General § 247.1 Purpose and scope. (a) The purpose of...

  3. Impact of highway construction on water bodies: a geospatial assessment.

    PubMed

    Vijay, Ritesh; Kushwaha, Vikash K; Mardikar, Trupti; Labhasetwar, P K

    2017-08-01

    India has witnessed a massive infrastructure boom in the past few years. One of such projects is National Highway-7 (NH-7), a North-South highway connecting Kanyakumari, Tamil Nadu, to Varanasi, Uttar Pradesh, traversing many water bodies. The present study aims to assess the pre- and post-construction impact due to existing, new and widened NH-7 on the physical status of the water bodies, using remote sensing techniques. Satellite images spanning 22 years were procured and analysed for change detection in land use and land cover within the waterbodies. The study indicates that construction activities have led to transformation within the water bodies regarding reduction in area and inter-changing of land use and land cover classes, in turn leading to siltation and reduction of recharge.

  4. Evaluation of the national Cleanyourhands campaign to reduce Staphylococcus aureus bacteraemia and Clostridium difficile infection in hospitals in England and Wales by improved hand hygiene: four year, prospective, ecological, interrupted time series study

    PubMed Central

    Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre

    2012-01-01

    Objective To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Design Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. Setting 187 acute trusts in England and Wales. Intervention Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Main outcome measures Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Results Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10 000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P<0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P<0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P=0.02) and C difficile infection (0.75, 0.67 to 0.84; P<0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. Conclusions The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections. PMID:22556101

  5. Evaluation of the national Cleanyourhands campaign to reduce Staphylococcus aureus bacteraemia and Clostridium difficile infection in hospitals in England and Wales by improved hand hygiene: four year, prospective, ecological, interrupted time series study.

    PubMed

    Stone, Sheldon Paul; Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre

    2012-05-03

    To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. 187 acute trusts in England and Wales. Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10,000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P < 0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P < 0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P = 0.02) and C difficile infection (0.75, 0.67 to 0.84; P < 0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections.

  6. Study Techniques for Controlling Flavor Intensity in Compressed Foods (Phase 2)

    DTIC Science & Technology

    1976-06-10

    and gravies were prepared as cooked materials, freeze- dried and chopped . The mushroom soup ingredients were all used as procured in their dry...This material, after blending with the soup base, was free£e= dried and chopped prior to blending with the re- maining components in preparation of...Exec- utive Chef, using the following formula: TABLE XII Onion Gravy Formula Ingredients % Onions, Chopped Tomato Paste Hard Wheat Flour Beef

  7. Procurement of a Nanoindenter for Structure-Function Analyses of Biologically Inspired High Performance Composite Materials

    DTIC Science & Technology

    2012-01-13

    abalone shell (Figures 3, 4). Here, we can see that the damage is significantly mitigated in the nacreous regions while cracks formed in the Calcitic...properties. Page 5 / 11 Identifying the crack propagation mechanisms helps to identify new designs for impact resistant materials, so the...human tooth from dentin – dentin/ enamel junction – enamel . It is clear that higher resolution scans are necessary to interrogate local structure

  8. Teal Ruby Experiment. Phase I Definition Study. Volume I. Part 2. Appendixes

    DTIC Science & Technology

    1977-05-01

    degree, Engineering Mechanics, Stanford University; M.S., Physics, New Mexico State University; B.A., Mathematics, Uaiversity of California atLos...Receiving Inspection Supervisor, military aircraft parts and materials * M.B.A., Mexico City College; Industrial Engineering, General Motors Institute A...S$Act ..MCA!y. f A SuiSn.•..v Of t¢OCtNI1 AI*CIATf COIOV*A,*ON LMSC-5699533 RICHARD- C. SEXT -ON -. Material Procurement Responsibilities

  9. Arizona in . . . 16mm Films, 8mm Films, Filmloops, Filmstrips, Slides, Transparencies, Cassettes, Records, Photos, Prints, Posters, Charts, Study Prints, Maps, Flags, Book Returns, Bookmarks, Foods, Microfilm, Place Mats, Relief Model Kits, Stereo Picture Reels.

    ERIC Educational Resources Information Center

    Choncoff, Mary, Comp.

    The product of a year's search through numerous selection aids, catalogs, conference exhibits, book stores, shops at Arizona historical sites, etc., this compilation presents both instructional and promotional non-print materials relative to Arizona. Procedures for procuring materials, annotations, and bibliographic information (source, date of…

  10. 78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...

  11. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  12. 48 CFR 752.225-71 - Local procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...

  13. Professional education and hospital development for organ donation.

    PubMed

    Fukushima, N; Konaka, S; Kato, O; Ashikari, J

    2012-05-01

    Because of the strict Organ Transplantation Act, only 81 brain dead (BD) organ donations had been performed in Japan for 13 years since 1997. The Act was revised on July 17, 2010, allowing, organs to be donated after BD with consent from the family, if the subject had not denied organ donation previously. This act has lead to an expectation of a 6-7-fold increase in BD donation. The 82 organ procurement coordinators (OPC) in Japan include 32 belonging to the Japanese Organ Network (JOT) and the others to each administrative division. JOT has guideline manuals of standard roles and procedures of OPC during organ procurement from BD and cardiac death donors. To manage the increased organ donations after the revision of the act, we have modified the education system. First, we modified the guideline manuals for OPC to correspond to the revised Transplant Act and governmental guidelines. Second, all OPC gathered in a meeting room to learn the new organ procurement system to deal with the revised Transplant Act and guidelines. Third, a special education program for 2 months was provided for the 10 newcomers. Last, the practical training in each donor case for newcomers was performed by older OPC. Topics of the education program were the revised transplant act and guidelines, family approach to organ donation, BD diagnosis, donor evaluation and management, organ procurement and preservation, allocation system, hospital development and family care. In the future, each OPC will be divided into special categories, such as the donor family OPC, the donor management OPC, and the operating room OPC. Therefore, we need to construct separate special education programs for each category. Copyright © 2012 Elsevier Inc. All rights reserved.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, K.J.; Wales, D.

    This document presents a gasket replacement study performed by AAI Corporation for the U.S. Army Chemical Research, Development and Engineering Center. The new gaskets will replace those currently used in the M3A3 Smoke Generator. In accordance with Delivery Order 0002, AAI performed the following tasks: (1) Conducted a literature and industry search for new gasket material, (2) Selected and procured four of the most promising replacement materials, (3) Tested gaskets fabricated from these materials using a GFE M3A3 Smoke Generator, and (4) Recommended final replacement gaskets based on cost, chemical and temperature resistance, and test performance.

  15. Development of an All-Metal Thick Film Cost Effective Metallization System for Solar Cells

    NASA Technical Reports Server (NTRS)

    Ross, B.

    1980-01-01

    Materials including copper powders, silver-fluoride, and silicon wafers were procured and copper pastes were prepared. Electrodes made with copper pastes were analyzed and compared with the raw materials. A needle-like structure was observed on the electroded solar cells, and was identified as eutectic copper-silicon by electron probe X-ray spectroscopy. The existence of this phase was thought to benefit electrical and metallurgical properties of the contact. Subsequently electrodes made from new material were also shown to contain this phase while simultaneously having poor adhesion.

  16. 7 CFR 2902.36 - Concrete and asphalt release fluids.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Concrete and asphalt release fluids. 2902.36 Section... PROCUREMENT Designated Items § 2902.36 Concrete and asphalt release fluids. (a) Definition. Products that are designed to provide a lubricating barrier between the composite surface materials (e.g., concrete or...

  17. Net News--Old Wine in a New Bottle?

    ERIC Educational Resources Information Center

    Bredon, George

    1999-01-01

    Observes that instructors may not use news items extensively as a source of assigned materials because of the cost incurred in their procurement. Argues that the Internet provides a much less expensive and wider pool of current resources for instructors. Reviews traditional paper and new electronic newsclip production methods. (DSK)

  18. 28 CFR 0.111B - Witness Security Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tracking of such persons; and (8) Exempt procurement for services, materials, and supplies, and the... the Director knows or the request indicates that the person is under investigation for or has been... Marshals Service designated by the Director may: (1) Provide suitable documents to enable the person to...

  19. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  20. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  1. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  2. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  3. 7 CFR 1728.70 - Procurement of materials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...

  4. 22 CFR 201.24 - Progress and advance payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... are payments to a supplier prior to, and in anticipation of, performance under a procurement contract. They are not based on actual performance or actual costs incurred. (b) Progress payments—(1) Conditions... predelivery costs that may have a material impact on a suppliers's working capital; (iii) The total FAS...

  5. Industrialized Building System/Two-Step Procurement Pilot Projects: Three Case Studies.

    DTIC Science & Technology

    1985-01-01

    roughly 48,000 sq ft in size, the center houses a competition . gymnasium, natatorium, exercise and training equipment, and handball / racquetball courts...T3 -Architectural 1. General 2. Submission Documents 3. Building Form 4. Design Instructions 0 5. Materials 6. Handball Court Walls, Doors, Hardware

  6. Dealing with Death: A Strategy for Tragedy. Fastback 306.

    ERIC Educational Resources Information Center

    Kelly, Evelyn B.

    The intent of this fastback is to give school personnel a strategy for dealing with tragedy affecting their students. approach to dealing with tragedy in a school situation. The approach includes getting accurate information, informing appropriate personnel, procuring counseling and educational materials, involving various parents, and dealing…

  7. A computer based approach for Material, Manpower and Equipment managementin the Construction Projects

    NASA Astrophysics Data System (ADS)

    Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.

    2017-07-01

    The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects and how the percentage various from project to project.

  8. The Challenge of Access: Using Road Construction as a Tool in Counterinsurgency

    DTIC Science & Technology

    2011-06-10

    northward, as shown in figure 9. Built by the United States in the 1950s, the dam and its downstream channels provide water for irrigation across the...12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT This...consolidated Russian control. It also brought Russia closer to an overriding strategic objective, the procurement of a warm water port from which to project

  9. Naval Procurement Problems: Theory and Practice

    DTIC Science & Technology

    1982-01-01

    contrast when construction is contracted for the product may be modified before delivery and new information of relevance to both parties may be learned en...defense policy which may be desirable. For example, what price are we willing to pay for flexibility and surge capacity is a defense policy question...work force by an order of magnitude and achieve the productivity used as a basis for contract pricing was a primary factor in the schedule slippage

  10. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-04-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...statements among others, although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS

  11. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-07-01

    Background, Issues, and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK...performed out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  12. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-03-29

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...performed out of sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  13. Technical change in US industry: A cross-industry analysis

    NASA Technical Reports Server (NTRS)

    Nelson, R. R. (Editor)

    1981-01-01

    The nature of the public policies which have influenced the pace and pattern of technical progress in a number of American industries is studied with the view of assessing the broad effects of these policies. The industries studied are agriculture, pharmaceuticals, semiconductors, computers, civil aircraft, automobiles and residential construction. The policies considered include research and development funding as well as government procurement, education, information dissemination, patent protection, licensing, regulations, and anti-trust policies.

  14. NATO Phase Zero Contracting - A Proposed Strategic and Operational Planning Construct Within the NATO Framework for Defense Planning and Standardization

    DTIC Science & Technology

    2015-02-12

    become better stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational...stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational redundancy and...Conference—Best Practices and Lessons Learned and Training and Educating for Acquisition, Procurement and Contracting in Defense Institutions

  15. Establishment of Low Energy Building materials and Equipment Database Based on Property Information

    NASA Astrophysics Data System (ADS)

    Kim, Yumin; Shin, Hyery; eon Lee, Seung

    2018-03-01

    The purpose of this study is to provide reliable service of materials information portal through the establishment of public big data by collecting and integrating scattered low energy building materials and equipment data. There were few cases of low energy building materials database in Korea have provided material properties as factors influencing material pricing. The framework of the database was defined referred with Korea On-line E-procurement system. More than 45,000 data were gathered by the specification of entities and with the gathered data, price prediction models for chillers were suggested. To improve the usability of the prediction model, detailed properties should be analysed for each item.

  16. The biophysical characteristics of human composite flexor tendon allograft for upper extremity reconstruction.

    PubMed

    DeGeorge, Brent R; Rodeheaver, George T; Drake, David B

    2014-01-01

    Devastating volar hand injuries with significant damage to the skin and soft tissues, pulley structures and fibro-osseous sheath, flexor tendons, and volar plates pose a major problem to the reconstructive hand surgeon. Despite advances in tendon handling, operative technique, and postoperative hand rehabilitation, patients who have undergone flexor tendon reconstruction are often plagued by chronic pain, stiffness, and decreased range of motion with resultant decreased ability to work and poor quality of life. In this article, we expand the technique of human composite flexor tendon allografts (CFTAs), pioneered by Dr E.E. Peacock, Jr, which consist of both the intrasynovial and extrasynovial flexor digitorum superficialis and flexor digitorum profundus tendons and their respective fibro-osseous sheath consisting of the digital pulley structures, periosteum, and volar plates procured from cadaveric donors with the use of modern tissue processing techniques. Human cadaveric CFTAs were procured and divided into 2 groups-unprocessed CFTAs and processed CFTAs, which are cleansed and sterilized to a sterility assurance level of 10(-6). Physical length and width relationships as well as tensile strength and gliding resistance assessments were recorded pre-tissue and post-tissue processing. The histologic properties of the composite allografts were assessed before and after tissue processing. There was no significant difference with respect to physical properties of the composite allografts before or after tissue processing. The processed composite allografts demonstrated equivalent maximum load to failure and elastic modulus compared to unprocessed tendons. The gliding resistance of the composite tendon allografts was not significantly different between the 2 groups. The use of CFTAs addresses the issues of adhesion formation and lack of suitable donor material by providing a source of intrasynovial tendon in its unaltered fibro-osseous sheath without donor morbidity. This approach represents an important step toward designing an ideal material for complex flexor tendon reconstruction, which takes advantage of an intrasynovial flexor tendon in its native fibro-osseous sheath without the need for additional donor morbidity using a construct which can be engineered to have minimal tissue reactivity, negligible potential for disease transmission, and improved tendon healing properties versus standard tendon allograft.

  17. Materials Research for Advanced Inertial Instrumentation. Task 3. Rare Earth Magnetic Material Technology as Related to Gyro Torquers and Motors.

    DTIC Science & Technology

    1980-12-01

    spray process ...... ............... .. 40 9 Etched microstructures of as-received alloys ................ 42 10 Microstructures of as...Figure 8. Schematic sketch of spray process . 40 4.5 Results and Discussion 4.5.1 Alloy Procurement The desired compositions of the deposits (after... deposited samples...................... 44 11 As- Sprayed x-ray patterns obtained on two deposits made with 34 wt % Sm and one with 30 wt % Sm powders

  18. Cumulative Damage Model for Advanced Composite Materials.

    DTIC Science & Technology

    1982-07-01

    STANDARS 963-A AFWAL- TR- 82-4094 CUMULATIVE DAMAGE MODEL FOR ADVANCED COMPOSITE MATERIALS GENERAL DYNAMICS FORT WORTH DIVISION P. 0. BOX 748 FORT...WORTH, TEXAS 76101 July 1982 Final Report for Period 23 February 1981 to 23 May 19k2. Approved. for public rel ts ; dA.st ? ,* -i; .c- ,. a-. LJ ( MAR 2... procurement operation, the United Scat-.s Government thereby Incurr no responsibility nor any obligation whatsoever; and the fact t.’at the government may

  19. Transformation of fraud activities in procurement system in Indonesia

    NASA Astrophysics Data System (ADS)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  20. Operating a petabyte class archive at ESO

    NASA Astrophysics Data System (ADS)

    Suchar, Dieter; Lockhart, John S.; Burrows, Andrew

    2008-07-01

    The challenges of setting up and operating a Petabyte Class Archive will be described in terms of computer systems within a complex Data Centre environment. The computer systems, including the ESO Primary and Secondary Archive and the associated computational environments such as relational databases will be explained. This encompasses the entire system project cycle, including the technical specifications, procurement process, equipment installation and all further operational phases. The ESO Data Centre construction and the complexity of managing the environment will be presented. Many factors had to be considered during the construction phase, such as power consumption, targeted cooling and the accumulated load on the building structure to enable the smooth running of a Petabyte class Archive.

  1. The Danish Organic Action Plan 2020: assessment method and baseline status of organic procurement in public kitchens.

    PubMed

    Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge

    2015-09-01

    With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.

  2. Evaluating All-Metal Valves for Use in a Tritium Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Houk, L.; Payton, A.

    In the tritium gas processing system, it is desired to minimize polymer components due to their degradation from tritium exposure (beta decay). One source of polymers in the tritium process is valve components. A vendor has been identified that manufactures a valve that is marketed as being made from all-metal construction. This manufacturer, Ham-Let Group, manufactures a diaphragm valve (3LE series) that claims to be made entirely of metal. SRNL procured twelve (12) Ham-Let diaphragm valves for characterization and evaluation. The characterization tests include identification of the maximum pressure of these valves by performing pressure and burst tests. Leak testsmore » were performed to ensure the valves do not exceed the acceptable leak rate for tritium service. These valves were then cycled in a nitrogen gas and/or vacuum environment to ensure they would be durable in a process environment. They were subsequently leak tested per ASTM protocol to ensure that the valves maintained their leak tight integrity. A detailed material analysis was also conducted to determine hydrogen and tritium compatibility.« less

  3. Chapter 9: Curating xylaria

    Treesearch

    Alex Wiedenhoeft

    2014-01-01

    Wood is perhaps the quintessential material used in most human cultures. In prehistoric times, it was employed, either directly or indirectly, to provide most human needs: warmth, shelter, and nearly all manner of tools suitable for procuring food, water and security (Beeckman, 2003). In modern times it continues to play important roles in human cultures (Radkau, 2012...

  4. 41 CFR 105-60.405 - Processing requests for confidential commercial information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... commercial information. (b) Definitions. For the purposes of this section, the following definitions apply... contain material arguably exempt from release under 5 U.S.C. 552(b)(4), because disclosure could... procurements, the requirements of Federal Acquisition Regulation 48 CFR 15.407(c)(8) and 52.215-12 also apply...

  5. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Phase 2 synopsis, and NASA will provide that source to all the material furnished to the Phase 1... the date upon which Phase 2 proposals are requested. Any such changes in evaluation factors will not... procurement using a progressive competition down-selection technique between phases. In this technique, two or...

  6. 48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Phase 2 synopsis, and NASA will provide that source to all the material furnished to the Phase 1... the date upon which Phase 2 proposals are requested. Any such changes in evaluation factors will not... procurement using a progressive competition down-selection technique between phases. In this technique, two or...

  7. 41 CFR 101-27.207-1 - Agency controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Agency controls. 101-27.207-1 Section 101-27.207-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.2-Management of Shelf-Life Materials § 101...

  8. 41 CFR 101-27.207-1 - Agency controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Agency controls. 101-27.207-1 Section 101-27.207-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-2...

  9. A (13)C NMR analysis of the effects of electron radiation on graphite/polyetherimide composites

    NASA Technical Reports Server (NTRS)

    Ferguson, Milton W.

    1989-01-01

    Initial investigations have been made into the use of high resolution nuclear magnetic resonance (NMR) for the characterization of radiation effects in graphite and Kevlar fibers, polymers, and the fiber/matrix interface in graphite/polyetherimide composites. Sample preparation techniques were refined. Essential equipment has been procured. A new NMR probe was constructed to increase the proton signal-to-noise ratio. Problem areas have been identified and plans developed to resolve them.

  10. Creating Cost Growth Models for the Engineering and Manufacturing Development Phase of Acquisition Using Logistic and Multiple Regression

    DTIC Science & Technology

    2004-03-01

    constant variance via an analysis of the residuals, as well as the Breusch - Pagan test (see Figure 3 below). As a result, we follow the footsteps of...reasonably normal, which ensures that our residuals meet the assumption of constant variance by passing the Breusch - Pagan test (see Figure 4 below...sections for Research and Development, Test and Evaluation (RDT&E), procurement and military construction (Jarvaise, 1996:3). While differing

  11. Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-06-04

    Aegis combat system and the arming of the ship with the SM-3, a version of the Navy’s Standard Missile that is designed for BMD operations.6 Total...and assigning the construction of those ships to GD/BIW and/or NGSB; • procuring AGS- armed versions of the basic LPD-17 class hull—another option...subcommittee of the House Armed Services Committee.24 22 Christopher P. Cavas, “All

  12. Construction and Testing of an 80C86 Based Communications Controller for the Petite Amateur Navy Satellite (PANSAT)

    DTIC Science & Technology

    1990-12-01

    S) Naval Postgraduate School 6a. NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a NAME OF MONITORING ORGANIZATION (if applicable ) Code 33 6c...FUNDING/SPONSORING Bb. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (If applicable ) 8c. ADDRESS (City, State, and ZIP Code...system’s individual components. Then one derives the overall system reliability from that information, using a simple mathematical model, to be

  13. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  14. Analysis of procurement processes and development of recommendations for intelligent transportation systems (ITS) procurements : final report.

    DOT National Transportation Integrated Search

    2007-09-01

    Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...

  15. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  16. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  17. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  18. 40 CFR 35.6565 - Procurement methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  19. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...

  20. 22 CFR 201.23 - Procurement under private sector procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  1. 75 FR 13262 - Procurement List Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...

  2. 75 FR 49481 - Procurement List; Additions and Deletion

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  3. Encapsulation of a Decision-Making Model to Optimize Supplier Selection via Structural Equation Modeling (SEM)

    NASA Astrophysics Data System (ADS)

    Sahul Hameed, Ruzanna; Thiruchelvam, Sivadass; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Mat Husin, Norhayati; Ezanee Rusli, Mohd; Yong, Lee Choon; Ghazali, Azrul; Itam, Zarina; Hakimie, Hazlinda; Beddu, Salmia; Liyana Mohd Kamal, Nur

    2016-03-01

    This paper proposes a conceptual framework to compare criteria/factor that influence the supplier selection. A mixed methods approach comprising qualitative and quantitative survey will be used. The study intend to identify and define the metrics that key stakeholders at Public Works Department (PWD) believed should be used for supplier. The outcomes would foresee the possible initiatives to bring procurement in PWD to a strategic level. The results will provide a deeper understanding of drivers for supplier’s selection in the construction industry. The obtained output will benefit many parties involved in the supplier selection decision-making. The findings provides useful information and greater understanding of the perceptions that PWD executives hold regarding supplier selection and the extent to which these perceptions are consistent with findings from prior studies. The findings from this paper can be utilized as input for policy makers to outline any changes in the current procurement code of practice in order to enhance the degree of transparency and integrity in decision-making.

  4. 77 FR 11071 - Procurement List; Additions and Deletions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...

  5. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  6. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  7. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  8. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  9. 75 FR 4784 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...

  10. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  11. 22 CFR 1006.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  12. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  13. 21 CFR 1404.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  14. 34 CFR 85.220 - Are any procurement contracts included as covered transactions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...

  15. Advocating mindset for cooperative partnership for better future of construction industry

    NASA Astrophysics Data System (ADS)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  16. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  17. Roles of sex and ethnicity in procurement coordinator--family communication during the organ donation discussion.

    PubMed

    Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A

    2010-09-01

    Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.

  18. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  19. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-11-21

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an...I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  20. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-07-20

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...overall. “While we agree on requirements—and the Navy and Marine Corps are pretty aligned on that—we have to balance the capability and the capacity...sequence and significant rework has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on

Top