23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... acquisition of land needed for the facility, or such projects may be constructed on existing highway right-of... bicycle lanes, paths, shelters, bicycle parking facilities and other roadway and bridge work necessary to... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
NASA Astrophysics Data System (ADS)
Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor
2017-10-01
The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.
7 CFR 1710.251 - Construction work plans-distribution borrowers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...
Multiloop Integral System Test (MIST): MIST Facility Functional Specification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Habib, T F; Koksal, C G; Moskal, T E
1991-04-01
The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility --more » the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs.« less
Improving NAVFAC's total quality management of construction drawings with CLIPS
NASA Technical Reports Server (NTRS)
Antelman, Albert
1991-01-01
A diagnostic expert system to improve the quality of Naval Facilities Engineering Command (NAVFAC) construction drawings and specification is described. C Language Integrated Production System (CLIPS) and computer aided design layering standards are used in an expert system to check and coordinate construction drawings and specifications to eliminate errors and omissions.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...
Science Facilities for Mississippi Schools, Grades 1-12.
ERIC Educational Resources Information Center
Mississippi State Dept. of Education, Jackson. Div. of Instruction.
Prepared to assist those planning the construction of new science facilities on the elementary, intermediate, or secondary school level. Standards are outlined and specifications detailed. A statement of fifteen general pricniples for planning science facilities in secondary schools precedes a discussion of--(1) special facilities for different…
Jennings, T A; Scheer, A; Emodi, A; Puderbach, L; King, S; Norton, T
1996-01-01
This paper demonstrates the importance of the inspection qualification (IQ). It was shown that the facilities were adequate to house the dryer and its associated instrumentation, and that the facilities had sufficient utilities to operate the dryer. The IQ established that the design and construction of the dryer was in agreement with the proposed hardware and design specifications. It was verified that the dryer was constructed in accordance with specifications set-forth by the equipment manufacturer.
15 CFR 971.606 - Onshore information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...
15 CFR 971.606 - Onshore information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...
7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18
Code of Federal Regulations, 2010 CFR
2010-01-01
... §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of...) ASSOCIATIONS Community Facility Loans § 1942.9 Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...
Financing Public School Facilities in Texas: A Case Study.
ERIC Educational Resources Information Center
Dawn, Lisa
A case study is presented of a Texas educational facilities program that was developed to provide long-term state assistance to school districts for the construction or renovation of their facilities by providing equal access to revenue for the specific purpose of repaying debt issued to finance instructional facilities. This report presents a…
Strategies for healthcare facilities, construction, and real estate management.
Lee, James G
2012-05-01
Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.
Guidance Notes on Safer School Construction: Global Facility for Disaster Reduction and Recovery
ERIC Educational Resources Information Center
World Bank Publications, 2009
2009-01-01
This document provides a framework of guiding principles and general steps addressing the construction of safer and more disaster resilient education facilities. It is aimed to be adapted to the local context and used to develop a context-specific plan to address a critical gap to reaching the Education for All (EFA) and Millennium Development…
46 CFR 160.151-47 - Requirements for owners or operators of servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities. 160.151-47 Section 160.151-47 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151-47 Requirements for owners or operators of servicing facilities. To maintain...
Towards the 21st Century. Facilities for Tertiary Education.
ERIC Educational Resources Information Center
Corbett, Anne, Ed.
This report presents observations of experts in planning, design, construction or management of tertiary educational facilities about the emerging issues and the appropriate planning and architectural solutions for higher education facilities as the new millennium approaches. Specific topics discuss the current context of tertiary education…
Gradient Heating Facility. Experiment cartridges. Description and general specifications
NASA Technical Reports Server (NTRS)
Breton, J.
1982-01-01
Specifications that define experiment cartridges that are compatible with the furnace of the gradient heating facility on board the Spacelab are presented. They establish a standard cartridge design independent of the type of experiment to be conducted. By using them, experimenters can design, construct, and test the hot section of the cartridge, known as the high temperature nacelle.
Space Station Furnace Facility. Volume 2: Appendix 1: Contract End Item specification (CEI), part 1
NASA Technical Reports Server (NTRS)
Seabrook, Craig
1992-01-01
This specification establishes the performance, design, development, and verification requirements for the Space Station Furnace Facility (SSFF) Core. The definition of the SSFF Core and its interfaces, specifies requirements for the SSFF Core performance, specifies requirements for the SSFF Core design, and construction are presented, and the verification requirements are established.
40 CFR 35.917-1 - Content of facilities plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...
Title I preliminary engineering for: A. S. E. F. solid waste to methane gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-01-01
An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less
Effects of State Policies on Facilities Planning and Construction in Rural Districts. ERIC Digest.
ERIC Educational Resources Information Center
Lawrence, Barbara Kent
State policies greatly affect the decisions rural districts make about building or renovating school facilities. State, federal, and local mechanisms for funding school facilities are briefly described. Some states require a specific percentage of growth or decline in student population or a minimum number of students as a prerequisite for…
NASA Astrophysics Data System (ADS)
Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo
2016-07-01
The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.
1989-04-01
transportation systems; (3) Well drilling and construction of basic sanitation facilities; and (4) Rudimentary construction and repair of public facilities. e. 10...reporting. The conferees, therefore, exempted ( de minimus) activities from this section. The conferees did not put a specific dollar ceiling on the...definition of ( de minimus) but wish to make clear they had in mind activities that have been commonplace on foreign exercises for decades. These would include
46 CFR 160.151-43 - Conditions at servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Conditions at servicing facilities. 160.151-43 Section 160.151-43 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151...
DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ballard, D.L.; Brown, W.W.; Harrison, C.W.
Design and construction specifications to be followed in the development of the reactor, its associated systems and experimental facilities, and the housing and required services for the facility are presented. The testing procedures to be used are outlined. (D.C.W.)
High-rise construction in historical cities through the example of Saint Petersburg
NASA Astrophysics Data System (ADS)
Granstrem, Maria; Zolotareva, Milena; Slavina, Tatyana
2018-03-01
The article sets forth results of the landscape visual analysis of the interaction of high-rise construction facilities with the environment of historical urban spaces. A toxic connection of high-rise construction facilities with the established urban landscape was analyzed and recorded. One of the latest stages of the reconstruction of historical cities, which penetrated many European countries at the end of the 20th century, also started in the beginning of the 21st century in Russia, where the reconstruction of historical facilities and territories became one of the leading trends of architectural activity. Therefore, problems of the interaction between the old city and new high-rise construction nearby historical centers are extremely relevant for Russian architects. Specific features of Russian high-rise construction within visual borders of historical cities, developed at the turn of the 20th-21st centuries, repeat past urban-planning mistakes spread in Europe in the second half of the 20th century. High-rise construction in close proximity to historical centers of cities violates an established scale and destroys a historical city silhouette.
46 CFR 160.151-41 - Approval of servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval of servicing facilities. 160.151-41 Section 160.151-41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151-41...
46 CFR 160.062-8 - Procedures for acceptance of testing facility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment...
46 CFR 160.062-7 - Procedures for acceptance of repair facility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Procedures for acceptance of repair facility. 160.062-7 Section 160.062-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment...
NASA Astrophysics Data System (ADS)
Duffó, G. S.; Arva, E. A.; Schulz, F. M.; Vazquez, D. R.
2013-07-01
The National Atomic Energy Commission of the Argentine Republic is developing a nuclear waste disposal management programme that contemplates the design and construction of a facility for the final disposal of intermediate-level radioactive wastes. The repository is based on the use of multiple, independent and redundant barriers. The major components are made in reinforced concrete so, the durability of these structures is an important aspect for the facility integrity. This work presents an investigation performed on an instrumented reinforced concrete prototype specifically designed for this purpose, to study the behaviour of an intermediate level radioactive waste disposal facility from the rebar corrosion point of view. The information obtained will be used for the final design of the facility in order to guarantee a service life more or equal than the foreseen durability for this type of facilities.
NASA Astrophysics Data System (ADS)
Duffó, G. S.; Arva, E. A.; Schulz, F. M.; Vazquez, D. R.
2012-01-01
The National Atomic Energy Commission of the Argentine Republic is developing a nuclear waste disposal management programme that contemplates the design and construction of a facility for the final disposal of intermediate-level radioactive wastes. The repository is based on the use of multiple, independent and redundant barriers. The major components are made in reinforced concrete so, the durability of these structures is an important aspect for the facility integrity. This work presents an investigation performed on a reinforced concrete specifically designed for this purpose, to predict the service life of the intermediate level radioactive waste disposal facility from data obtained with several techniques. Results obtained with corrosion sensors embedded in a concrete prototype are also included. The information obtained will be used for the final design of the facility in order to guarantee a service life more or equal than the foreseen durability for this type of facilities.
Engineering monitoring expert system's developer
NASA Technical Reports Server (NTRS)
Lo, Ching F.
1991-01-01
This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.
Structural and Functional Concepts in Current Mouse Phenotyping and Archiving Facilities
Kollmus, Heike; Post, Rainer; Brielmeier, Markus; Fernández, Julia; Fuchs, Helmut; McKerlie, Colin; Montoliu, Lluis; Otaegui, Pedro J; Rebelo, Manuel; Riedesel, Hermann; Ruberte, Jesús; Sedlacek, Radislav; de Angelis, Martin Hrabě; Schughart, Klaus
2012-01-01
Collecting and analyzing available information on the building plans, concepts, and workflow from existing animal facilities is an essential prerequisite for most centers that are planning and designing the construction of a new animal experimental research unit. Here, we have collected and analyzed such information in the context of the European project Infrafrontier, which aims to develop a common European infrastructure for high-throughput systemic phenotyping, archiving, and dissemination of mouse models. A team of experts visited 9 research facilities and 3 commercial breeders in Europe, Canada, the United States, and Singapore. During the visits, detailed data of each facility were collected and subsequently represented in standardized floor plans and descriptive tables. These data showed that because the local needs of scientists and their projects, property issues, and national and regional laws require very specific solutions, a common strategy for the construction of such facilities does not exist. However, several basic concepts were apparent that can be described by standardized floor plans showing the principle functional units and their interconnection. Here, we provide detailed information of how individual facilities addressed their specific needs by using different concepts of connecting the principle units. Our analysis likely will be valuable to research centers that are planning to design new mouse phenotyping and archiving facilities. PMID:23043807
Genotype Specification Language.
Wilson, Erin H; Sagawa, Shiori; Weis, James W; Schubert, Max G; Bissell, Michael; Hawthorne, Brian; Reeves, Christopher D; Dean, Jed; Platt, Darren
2016-06-17
We describe here the Genotype Specification Language (GSL), a language that facilitates the rapid design of large and complex DNA constructs used to engineer genomes. The GSL compiler implements a high-level language based on traditional genetic notation, as well as a set of low-level DNA manipulation primitives. The language allows facile incorporation of parts from a library of cloned DNA constructs and from the "natural" library of parts in fully sequenced and annotated genomes. GSL was designed to engage genetic engineers in their native language while providing a framework for higher level abstract tooling. To this end we define four language levels, Level 0 (literal DNA sequence) through Level 3, with increasing abstraction of part selection and construction paths. GSL targets an intermediate language based on DNA slices that translates efficiently into a wide range of final output formats, such as FASTA and GenBank, and includes formats that specify instructions and materials such as oligonucleotide primers to allow the physical construction of the GSL designs by individual strain engineers or an automated DNA assembly core facility.
40 CFR 35.917-1 - Content of facilities plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...
40 CFR 35.917-1 - Content of facilities plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...
Sports Fields: A Manual for Design Construction and Maintenance.
ERIC Educational Resources Information Center
Puhalla, Jim; Krans, Jeff; Goatley, Mike
Comprehensive technical reference information is provided for those responsible for the design, construction, renovation, or maintenance of sports grounds. Chapters illustrate specific design elements of all popular sports facilities, and explain how those elements are integrated in a successful project; explore commonly encountered sports field…
Selecting the Right Construction Delivery Method for a Specific Project.
ERIC Educational Resources Information Center
Klinger, Jeff; Booth, Scott
2002-01-01
Discusses the costs and benefits of various construction delivery methods for higher education facility projects, including the traditional lump sum general contracting approach (also known as design/bid/build); design-build; and, in the case of private institutions, guaranteed maximum pricing offered by those firms willing to perform construction…
Educational Specifications: Linking Design of School Facilities to Educational Program.
ERIC Educational Resources Information Center
California State Dept. of Education, Sacramento. Div. of School Facilities Planning.
The California Department of Education, directed to formalize regulations governing standards for new school design and construction, has prepared a guide to help school districts develop specifications based on the architectural principle that form follows function. This guide discusses the meaning of educational specifications and their…
Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…
Design and Construction of a Hydroturbine Test Facility
NASA Astrophysics Data System (ADS)
Ayli, Ece; Kavurmaci, Berat; Cetinturk, Huseyin; Kaplan, Alper; Celebioglu, Kutay; Aradag, Selin; Tascioglu, Yigit; ETU Hydro Research Center Team
2014-11-01
Hydropower is one of the clean, renewable, flexible and efficient energy resources. Most of the developing countries invest on this cost-effective energy source. Hydroturbines for hydroelectric power plants are tailor-made. Each turbine is designed and constructed according to the properties, namely the head and flow rate values of the specific water source. Therefore, a center (ETU Hydro-Center for Hydro Energy Research) for the design, manufacturing and performance tests of hydraulic turbines is established at TOBB University of Economics and Technology to promote research in this area. CFD aided hydraulic and structural design, geometry optimization, manufacturing and performance tests of hydraulic turbines are the areas of expertise of this center. In this paper, technical details of the design and construction of this one of a kind test facility in Turkey, is explained. All the necessary standards of IEC (International Electrotechnical Commission) are met since the test facility will act as a certificated test center for hydraulic turbines.
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
23 CFR 652.9 - Federal participation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
Design Guide for Selection and Specification of Kevlar Rope for Ocean Engineering and Construction.
1976-07-01
public rtoieco cnd sol . It i Idim .buttm Is ul"rnimi.. OCEAN ENGINEERING AND CONSTRUCTION PROJECT OFFICE CHESAPEAKE DIVISION NAVAL FACILITIES ENGINEERING...be to have no more than one layer. This is impractical for oceano - graphic purposes. Assuming a need to spooi many layers of rope under tension
10 CFR 50.13 - Attacks and destructive acts by enemies of the United States; and defense activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Requirement of License, Exceptions § 50.13 Attacks and... construct and operate a production or utilization facility, or for an amendment to such license, is not required to provide for design features or other measures for the specific purpose of protection against...
Preliminary study for a numerical aerodynamic simulation facility. Phase 1: Extension
NASA Technical Reports Server (NTRS)
Lincoln, N. R.
1978-01-01
Functional requirements and preliminary design data were identified for use in the design of all system components and in the construction of a facility to perform aerodynamic simulation for airframe design. A skeleton structure of specifications for the flow model processor and monitor, the operating system, and the language and its compiler is presented.
Maryland State Department of Education School Food and Nutrition Service Design Manual.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
The purpose of this manual is to suggest strategies for identifying components that must be addressed to create and develop a successful food service and nutrition facility. It focuses on the process involved in creating such facilities, and it provides an overview of the planning phase, design and construction, and educational specifications.…
ERIC Educational Resources Information Center
National Easter Seal Society for Crippled Children and Adults, Chicago, IL.
THIS STANDARD IS INTENDED TO PROVIDE MINIMUM REQUIREMENTS TO BE USED IN THE CONSTRUCTION OF ALL BUILDINGS AND FACILITIES AND FOR ADOPTION AND ENFORCEMENT BY ADMINISTRATIVE AUTHORITIES IN ORDER TO ALLOW INDIVIDUALS WITH PERMANENT PHYSICAL DISABILITIES TO PURSUE THEIR INTERESTS AND ASPIRATIONS, DEVELOP THEIR TALENTS, AND EXERCISE THEIR SKILLS.…
10 CFR 63.72 - Construction records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... records required under paragraph (a) of this section must include at least the following— (1) Surveys of... used; and (12) Facility design records (e.g, design specifications and “as built” drawings). ...
10 CFR 63.72 - Construction records.
Code of Federal Regulations, 2011 CFR
2011-01-01
... records required under paragraph (a) of this section must include at least the following— (1) Surveys of... used; and (12) Facility design records (e.g, design specifications and “as built” drawings). ...
10 CFR 63.72 - Construction records.
Code of Federal Regulations, 2013 CFR
2013-01-01
... records required under paragraph (a) of this section must include at least the following— (1) Surveys of... used; and (12) Facility design records (e.g, design specifications and “as built” drawings). ...
10 CFR 63.72 - Construction records.
Code of Federal Regulations, 2012 CFR
2012-01-01
... records required under paragraph (a) of this section must include at least the following— (1) Surveys of... used; and (12) Facility design records (e.g, design specifications and “as built” drawings). ...
10 CFR 63.72 - Construction records.
Code of Federal Regulations, 2014 CFR
2014-01-01
... records required under paragraph (a) of this section must include at least the following— (1) Surveys of... used; and (12) Facility design records (e.g, design specifications and “as built” drawings). ...
1981-12-02
audits of construction grants, a review of user charge system adequacy, including a review of the adequacy of reserve accounts for replacing major...recommendation to incorporate, as part of existing operation and and maintenance inspections and closeout financial audits of construction grants, a...determination to be made in an audit is whether the facility was constructed in conformance with approved plans and specifications and whether it meets
DOT National Transportation Integrated Search
2009-09-01
The objective of this study is to provide information detailing the safety consideration specifications for the : truck only and passenger only facilities for I-70 and I-44. The categories discussed in this report include: : Traffic Operation and Tru...
7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...
7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...
7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...
2013-03-08
applicable fire protection standards for two of the three projects we reviewed that required a fire sprinkler system . Specifically, the Secure...RSOI and Command and Control facilities do not have fire sprinkler systems as required by Unified Facilities Criteria 3-600-01, Section 4-2.2...stated that, as such, those facilities did not need fire sprinkler systems . Based on the justification provided by the Air Force on the DD Form 1391s
Facility design, construction, and operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less
Clean room survey and assessment, volume 5, appendix H
NASA Technical Reports Server (NTRS)
1991-01-01
The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.
49 CFR 37.41 - Construction of transportation facilities by public entities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 1 2011-10-01 2011-10-01 false Construction of transportation facilities by... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.41 Construction of transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. G. Little
1999-03-01
The Idaho National Engineering and Environmental Laboratory (INEEL), through the US Department of Energy (DOE), has proposed that a large-scale wind test facility (LSWTF) be constructed to study, in full-scale, the behavior of low-rise structures under simulated extreme wind conditions. To determine the need for, and potential benefits of, such a facility, the Idaho Operations Office of the DOE requested that the National Research Council (NRC) perform an independent assessment of the role and potential value of an LSWTF in the overall context of wind engineering research. The NRC established the Committee to Review the Need for a Large-scale Testmore » Facility for Research on the Effects of Extreme Winds on Structures, under the auspices of the Board on Infrastructure and the Constructed Environment, to perform this assessment. This report conveys the results of the committee's deliberations as well as its findings and recommendations. Data developed at large-scale would enhanced the understanding of how structures, particularly light-frame structures, are affected by extreme winds (e.g., hurricanes, tornadoes, sever thunderstorms, and other events). With a large-scale wind test facility, full-sized structures, such as site-built or manufactured housing and small commercial or industrial buildings, could be tested under a range of wind conditions in a controlled, repeatable environment. At this time, the US has no facility specifically constructed for this purpose. During the course of this study, the committee was confronted by three difficult questions: (1) does the lack of a facility equate to a need for the facility? (2) is need alone sufficient justification for the construction of a facility? and (3) would the benefits derived from information produced in an LSWTF justify the costs of producing that information? The committee's evaluation of the need and justification for an LSWTF was shaped by these realities.« less
More information on testing for maximum indoor pollutant concentrations for acceptance of the facility, as well as requirements for Independent Materials Testing of specific materials anticipated to have major impact on indoor air quality.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...
Iraqi Army Facilities Under the Iraq Security Forces Fund, Diyanah and Debecha, Iraq
2008-01-17
reinforcement bars and cast each building’s roof flatwork and horizontal beams to complete the structural aspects of the roof system . Steel header...included a mix of new construction and renovation of existing structures and facilities. The Statement of Requirements and Specifications provided...that renovation of existing structures , when possible, was preferred. In addition, the United States government encouraged the contractor to use
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 1 2012-10-01 2012-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
45 CFR 84.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
43 CFR 17.218 - New construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...
38 CFR 18.423 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false New construction. 18.423... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... facility is readily accessible to and usable by handicapped persons, if the construction was commenced...
10 CFR 1040.73 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...
10 CFR 1040.73 - New construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Placido, Andrew; Liu, Kunlei; Challman, Don
This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will producemore » research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in some detail in this report, along with lessons learned.« less
Performance of Coarse-Graded Mixes at Westrack - Premature Rutting
DOT National Transportation Integrated Search
1998-06-01
WesTrack is the Federal Highway Administration's (FHWA) test facility in Nevada for developing performance-related specifications for hot-mix asphalt pavement construction. It is also providing some of the earliest data on the performance of Superpav...
DOT National Transportation Integrated Search
2011-12-01
The national transportation network contains a significant number of highway and railway bridges. This research is intended to transform the use of precast/pre-stressed materials in the transportation infrastructure. Specifically it examines how nano...
Superpave Mixture Design Guide : Westrack Forensic Team Consensus Report
DOT National Transportation Integrated Search
2001-02-02
WesTrack was the Federal Highway Administration's (FHWA) test facility in Nevada for developing performance-related specifications for hot-mix asphalt pavement construction. It also provided some of the earliest data on the performance of Superpave a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ives, Robert Lawrence; Marsden, David; Collins, George
Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were builtmore » and successfully tested during the program.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2013 CFR
2013-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2014 CFR
2014-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Safety Evaluation Report for the Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-01-01
This report documents the US Nuclear Regulatory Commission (NRC) staff review and safety evaluation of the Louisiana Energy Services, L.P. (LES, the applicant) application for a license to possess and use byproduct, source, and special nuclear material and to enrich natural uranium to a maximum of 5 percent U-235 by the gas centrifuge process. The plant, to be known as the Claiborne Enrichment Center (CEC), would be constructed near the town of Homer in Claiborne Parish, Louisiana. At full production in a given year, the plant will receive approximately 4,700 tonnes of feed UF{sub 6} and produce 870 tonnes ofmore » low-enriched UF{sub 6}, and 3,830 tonnes of depleted UF{sub 6} tails. Facility construction, operation, and decommissioning are expected to last 5, 30, and 7 years, respectively. The objective of the review is to evaluate the potential adverse impacts of operation of the facility on worker and public health and safety under both normal operating and accident conditions. The review also considers the management organization, administrative programs, and financial qualifications provided to assure safe design and operation of the facility. The NRC staff concludes that the applicant`s descriptions, specifications, and analyses provide an adequate basis for safety review of facility operations and that construction and operation of the facility does not pose an undue risk to public health and safety.« less
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Facilities construction. 136.110 Section 136.110... Facilities and Services § 136.110 Facilities construction. In addition to other requirements of this subpart..., clinic, health station or quarters for housing personnel associated with such facilities, must in its...
Development of high integrity, maximum durability concrete structures for LLW disposal facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, W.P.
1992-05-01
A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less
Development of high integrity, maximum durability concrete structures for LLW disposal facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, W.P.
1992-01-01
A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE...-unit housing facilities. (1) If the financial assistance is to buy a dwelling or multi-unit housing...) Nonresidential buildings. Construction plans and specifications for new buildings or improvements to existing...
Simulation Enabled Safeguards Assessment Methodology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Bean; Trond Bjornard; Thomas Larson
2007-09-01
It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology (SESAME) has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements inmore » functionality. Drag and drop wireframe construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitoun, A.
The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, bothmore » normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.« less
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2014 CFR
2014-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2011 CFR
2011-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2013 CFR
2013-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
48 CFR 836.606-72 - Contract price.
Code of Federal Regulations, 2012 CFR
2012-10-01
... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...
Monitoring Species of Concern Using Noninvasive Genetic Sampling and Capture-Recapture Methods
2016-06-01
contents be construed as reflecting the official policy or position of the Department of Defense. Reference herein to any specific commercial product...Reserve in Mexico, and is home to more than 400 plant species and over 300 wildlife species. Construction of a border fence along the international...pronghorn mortality, a semi- captive breeding pen was constructed to facilitate pronghorn recovery (Otte 2006). The one- square mile facility is double
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Scope. 162.050-1 Section 162.050-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND... facility authorized to conduct approval tests; (5) Marking requirements; and (6) Factory inspection...
49 CFR 37.45 - Construction and alteration of transportation facilities by private entities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities by private entities. 37.45 Section 37.45 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.45 Construction and alteration of transportation facilities by private entities. In constructing and altering transit...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... guidelines would apply to the design, construction, and alteration of pedestrian facilities in the public... guidelines for the design, construction, and alteration of facilities covered by the Americans with... required to adopt accessibility standards for the design, construction, and alteration of facilities...
48 CFR 36.601-3 - Applicable contracting procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Services 36.601-3 Applicable contracting procedures. (a)(1) For facility design contracts, the statement of work shall require that the architect-engineer specify, in the construction design specifications, use..., availability, price reasonableness, and cost-effectiveness. Where appropriate, the statement of work also shall...
Bloom, Marshall E.; Hoe, Nancy P.; Arminio, Thomas; Carlson, Paul; Powers, Tamara; Feldmann, Heinz; Wilson, Deborah
2010-01-01
Construction of new BioSafety Level (BSL) 3 and 4 laboratories has raised concerns regarding provision of care to exposed workers because of healthcare worker (HCW) unfamiliarity with precautions required. When the National Institutes of Health began construction of a new BSL-4 laboratory in Hamilton, Montana, USA, in 2005, they contracted with St. Patrick Hospital in Missoula, Montana, for care of those exposed. A care and isolation unit is described. We developed a training program for HCWs that emphasized the optimal use of barrier precautions and used pathogen-specific modules and simulations with mannequins and fluorescent liquids that represented infectious body fluids. The facility and training led to increased willingness among HCWs to care for patients with all types of communicable diseases. This model may be useful for other hospitals, whether they support a BSL-4 facility, are in the proximity of a BSL-3 facility, or are interested in upgrading their facilities to prepare for exotic and novel infectious diseases. PMID:20202409
49 CFR 193.2304 - Corrosion control overview.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Corrosion control overview. 193.2304 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction § 193.2304 Corrosion control overview. (a... materials specifications from a corrosion control viewpoint and determines that the materials involved will...
49 CFR 193.2304 - Corrosion control overview.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Corrosion control overview. 193.2304 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction § 193.2304 Corrosion control overview. (a... materials specifications from a corrosion control viewpoint and determines that the materials involved will...
49 CFR 193.2304 - Corrosion control overview.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Corrosion control overview. 193.2304 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction § 193.2304 Corrosion control overview. (a... materials specifications from a corrosion control viewpoint and determines that the materials involved will...
49 CFR 193.2304 - Corrosion control overview.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Corrosion control overview. 193.2304 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction § 193.2304 Corrosion control overview. (a... materials specifications from a corrosion control viewpoint and determines that the materials involved will...
9 CFR 3.53 - Primary enclosures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... used at research facilities when approved by the Institutional Animal Care and Use Committee, and by... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits... enclosures shall be constructed so as to protect the rabbits' feet and legs from injury. Litter shall be...
9 CFR 3.53 - Primary enclosures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... research facilities when approved by the Institutional Animal Care and Use Committee, and by dealers and... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits... enclosures shall be constructed so as to protect the rabbits' feet and legs from injury. Litter shall be...
9 CFR 3.53 - Primary enclosures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... used at research facilities when approved by the Institutional Animal Care and Use Committee, and by... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits... enclosures shall be constructed so as to protect the rabbits' feet and legs from injury. Litter shall be...
9 CFR 3.53 - Primary enclosures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... research facilities when approved by the Institutional Animal Care and Use Committee, and by dealers and... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits... enclosures shall be constructed so as to protect the rabbits' feet and legs from injury. Litter shall be...
9 CFR 3.53 - Primary enclosures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... used at research facilities when approved by the Institutional Animal Care and Use Committee, and by... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment and Transportation of Rabbits... enclosures shall be constructed so as to protect the rabbits' feet and legs from injury. Litter shall be...
Laser systems for the combustion research facility - Diana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, C.K.; Lavasek, J.W.; Jones, E.D.
1982-03-01
A 5-Joule/pulse, 1.8-..mu..s-pulse-width, 10-ppS flashlamp-pumped tunable-dye-laser system, called Diana, has been built for use in experiments to be performed at the Combustion Research Facility, Sandia National Laboratories, Livermore. Design specifications for the system and details of construction are described, and it is noted that performance of the laser meets or exceeds all design criteria. Areas for further performance improvements are discussed, and updates are suggested to enhance system usefulness.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-06-28
This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.
48 CFR 836.602-2 - Evaluation boards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...
77 FR 1780 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
... development--design and construction. Site utilities--design and construction. Stormwater facilities--design and construction. Airside/apron--design and construction. Landside/roadway--design and construction. General aviation terminal/apron--design and construction. Airport beacon relocation--design and...
NASA Technical Reports Server (NTRS)
Amos, Jeff; Beeman, Randy; Brown, Susan; Calhoun, John; Hill, John; Howorth, Lark; Mcfaden, Clay; Nguyen, Paul; Reid, Philip; Rexrode, Stuart
1989-01-01
A basic procedure for robotically constructing a manned Mars base is outlined. The research procedure was divided into three areas: environment, robotics, and habitat. The base as designed will consist of these components: two power plants, communication facilities, a habitat complex, and a hangar, a garage, recreation and manufacturing facilities. The power plants will be self-contained nuclear fission reactors placed approx. 1 km from the base for safety considerations. The base communication system will use a combination of orbiting satellites and surface relay stations. This system is necessary for robotic contact with Phobos and any future communication requirements. The habitat complex will consist of six self-contained modules: core, biosphere, science, living quarters, galley/storage, and a sick bay which will be brought from Phobos. The complex will be set into an excavated hole and covered with approximately 0.5 m of sandbags to provide radiation protection for the astronauts. The recreation, hangar, garage, and manufacturing facilities will each be transformed from the four one-way landers. The complete complex will be built by autonomous, artificially intelligent robots. Robots incorporated into the design are as follows: Large Modular Construction Robots with detachable arms capable of large scale construction activities; Small Maneuverable Robotic Servicers capable of performing delicate tasks normally requiring a suited astronaut; and a trailer vehicle with modular type attachments to complete specific tasks; and finally, Mobile Autonomous Rechargeable Transporters capable of transferring air and water from the manufacturing facility to the habitat complex.
NASA Astrophysics Data System (ADS)
Amos, Jeff; Beeman, Randy; Brown, Susan; Calhoun, John; Hill, John; Howorth, Lark; McFaden, Clay; Nguyen, Paul; Reid, Philip; Rexrode, Stuart
1989-05-01
A basic procedure for robotically constructing a manned Mars base is outlined. The research procedure was divided into three areas: environment, robotics, and habitat. The base as designed will consist of these components: two power plants, communication facilities, a habitat complex, and a hanger, a garage, recreation and manufacturing facilities. The power plants will be self-contained nuclear fission reactors placed approx. 1 km from the base for safety considerations. The base communication system will use a combination of orbiting satellites and surface relay stations. This system is necessary for robotic contact with Phobos and any future communication requirements. The habitat complex will consist of six self-contained modules: core, biosphere, science, living quarters, galley/storage, and a sick bay which will be brought from Phobos. The complex will be set into an excavated hole and covered with approximately 0.5 m of sandbags to provide radiation protection for the astronauts. The recreation, hangar, garage, and manufacturing facilities will each be transformed from the four one-way landers. The complete complex will be built by autonomous, artificially intelligent robots. Robots incorporated into the design are as follows: Large Modular Construction Robots with detachable arms capable of large scale construction activities; Small Maneuverable Robotic Servicers capable of performing delicate tasks normally requiring a suited astronaut; and a trailer vehicle with modular type attachments to complete specific tasks; and finally, Mobile Autonomous Rechargeable Transporters capable of transferring air and water from the manufacturing facility to the habitat complex.
The status of LILW disposal facility construction in Korea
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan
2013-07-01
In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodson, J.O.
This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodson, J.O.
This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less
Systematic Research and Evaluation in a Rural Pennsylvania School District.
ERIC Educational Resources Information Center
Leopold, Greg; And Others
This report summarizes the evaluation of a rural school district in Pennsylvania and offers recommendations reflecting the district's goals for school improvement and construction. Specifically, the objectives of the study were to identify curricular needs of the district and individual schools; review and assess district facilities with respect…
DOT National Transportation Integrated Search
1982-01-01
This report summarizes the work performed on the subject study from June through September 1982. In accordance with the revised work plan for Task 4 of the project approved May 24, 1982, the new completion date for the project is April 30, 1983.
AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION
NASA Technical Reports Server (NTRS)
1974-01-01
AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION KSC-374C-10236.33 108-KSC-374C-10236.33, P-15911, ARCHIVE-04477 Shuttle runway facility construction progress - oblique vertical, altitude 3,000 ft. time 1030 - direction south - south half from center.
Effects of wind-energy facilities on grassland bird distributions
Shaffer, Jill A.; Buhl, Deb
2016-01-01
The contribution of renewable energy to meet worldwide demand continues to grow. Wind energy is one of the fastest growing renewable sectors, but new wind facilities are often placed in prime wildlife habitat. Long-term studies that incorporate a rigorous statistical design to evaluate the effects of wind facilities on wildlife are rare. We conducted a before-after-control-impact (BACI) assessment to determine if wind facilities placed in native mixed-grass prairies displaced breeding grassland birds. During 2003–2012, we monitored changes in bird density in 3 study areas in North Dakota and South Dakota (U.S.A.). We examined whether displacement or attraction occurred 1 year after construction (immediate effect) and the average displacement or attraction 2–5 years after construction (delayed effect). We tested for these effects overall and within distance bands of 100, 200, 300, and >300 m from turbines. We observed displacement for 7 of 9 species. One species was unaffected by wind facilities and one species exhibited attraction. Displacement and attraction generally occurred within 100 m and often extended up to 300 m. In a few instances, displacement extended beyond 300 m. Displacement and attraction occurred 1 year after construction and persisted at least 5 years. Our research provides a framework for applying a BACI design to displacement studies and highlights the erroneous conclusions that can be made without the benefit of adopting such a design. More broadly, species-specific behaviors can be used to inform management decisions about turbine placement and the potential impact to individual species. Additionally, the avoidance distance metrics we estimated can facilitate future development of models evaluating impacts of wind facilities under differing land-use scenarios.
Effects of wind-energy facilities on breeding grassland bird distributions.
Shaffer, Jill A; Buhl, Deborah A
2016-02-01
The contribution of renewable energy to meet worldwide demand continues to grow. Wind energy is one of the fastest growing renewable sectors, but new wind facilities are often placed in prime wildlife habitat. Long-term studies that incorporate a rigorous statistical design to evaluate the effects of wind facilities on wildlife are rare. We conducted a before-after-control-impact (BACI) assessment to determine if wind facilities placed in native mixed-grass prairies displaced breeding grassland birds. During 2003-2012, we monitored changes in bird density in 3 study areas in North Dakota and South Dakota (U.S.A.). We examined whether displacement or attraction occurred 1 year after construction (immediate effect) and the average displacement or attraction 2-5 years after construction (delayed effect). We tested for these effects overall and within distance bands of 100, 200, 300, and >300 m from turbines. We observed displacement for 7 of 9 species. One species was unaffected by wind facilities and one species exhibited attraction. Displacement and attraction generally occurred within 100 m and often extended up to 300 m. In a few instances, displacement extended beyond 300 m. Displacement and attraction occurred 1 year after construction and persisted at least 5 years. Our research provides a framework for applying a BACI design to displacement studies and highlights the erroneous conclusions that can be made without the benefit of adopting such a design. More broadly, species-specific behaviors can be used to inform management decisions about turbine placement and the potential impact to individual species. Additionally, the avoidance distance metrics we estimated can facilitate future development of models evaluating impacts of wind facilities under differing land-use scenarios. Published 2015. This article is a U.S. Government work and is in the public domain in the USA.
Thermal enclosures for electronically scanned pressure modules operating in cryogenic environments
NASA Technical Reports Server (NTRS)
Mitchell, Michael; Sealey, Bradley S.
1989-01-01
Specific guidelines to design, construct, and test ESP thermal enclosures for applications at cryogenic temperatures are given. The enclosures maintain the ESP modules at a constant temperature (10 C plus or minus 1 C) to minimize thermal zero and sensitivity shifts, to minimize the frequency of expensive on-line calibrations, and to avoid adverse effects on tunnel and model boundary layers. The enclosures are constructed of a rigid closed-cell foam and are capable of withstanding the stagnation pressures to 932kPa (135 psia) without reduction in thermal insulation properties. This construction procedure has been used to construct several thermal packages which have been successfully used in National Transonic Facility.
Framework for leadership and training of Biosafety Level 4 laboratory workers.
Le Duc, James W; Anderson, Kevin; Bloom, Marshall E; Estep, James E; Feldmann, Heinz; Geisbert, Joan B; Geisbert, Thomas W; Hensley, Lisa; Holbrook, Michael; Jahrling, Peter B; Ksiazek, Thomas G; Korch, George; Patterson, Jean; Skvorak, John P; Weingartl, Hana
2008-11-01
Construction of several new Biosafety Level 4 (BSL-4) laboratories and expansion of existing operations have created an increased international demand for well-trained staff and facility leaders. Directors of most North American BSL-4 laboratories met and agreed upon a framework for leadership and training of biocontainment research and operations staff. They agreed on essential preparation and training that includes theoretical consideration of biocontainment principles, practical hands-on training, and mentored on-the-job experiences relevant to positional responsibilities as essential preparation before a person's independent access to a BSL-4 facility. They also agreed that the BSL-4 laboratory director is the key person most responsible for ensuring that staff members are appropriately prepared for BSL-4 operations. Although standardized certification of training does not formally exist, the directors agreed that facility-specific, time-limited documentation to recognize specific skills and experiences of trained persons is needed.
Framework for Leadership and Training of Biosafety Level 4 Laboratory Workers
Anderson, Kevin; Bloom, Marshall E.; Estep, James E.; Feldmann, Heinz; Geisbert, Joan B.; Geisbert, Thomas W.; Hensley, Lisa; Holbrook, Michael; Jahrling, Peter B.; Ksiazek, Thomas G.; Korch, George; Patterson, Jean; Skvorak, John P.; Weingartl, Hana
2008-01-01
Construction of several new Biosafety Level 4 (BSL-4) laboratories and expansion of existing operations have created an increased international demand for well-trained staff and facility leaders. Directors of most North American BSL-4 laboratories met and agreed upon a framework for leadership and training of biocontainment research and operations staff. They agreed on essential preparation and training that includes theoretical consideration of biocontainment principles, practical hands-on training, and mentored on-the-job experiences relevant to positional responsibilities as essential preparation before a person’s independent access to a BSL-4 facility. They also agreed that the BSL-4 laboratory director is the key person most responsible for ensuring that staff members are appropriately prepared for BSL-4 operations. Although standardized certification of training does not formally exist, the directors agreed that facility-specific, time-limited documentation to recognize specific skills and experiences of trained persons is needed. PMID:18976549
Baker, J
1996-01-01
The purpose of this study was to identify patterns of admission, discharge, and readmission between hospital and long-term care facility among a group of Florida long-term care facility residents with pressure ulcers whose care was paid for by Medicaid. A patient-specific, longitudinal claims history database was constructed from data provided by the Florida Department of Health and Rehabilitative Services. This database was used to determine and analyze hospital admissions for pressure ulcer care among Medicaid recipients cared for in a long-term care facility. Analysis of the data determined that more than half of the Medicaid-covered long-term care facility residents who formed the target study group (54.57%) had multiple hospital admissions associated with pressure ulcers. Pressure ulcer hospital admissions amounted to a program cost of $9.9 million.
9 CFR 3.1 - Housing facilities, general.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...
9 CFR 3.1 - Housing facilities, general.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...
MAN-004 Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Timothy L.
2014-07-01
At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less
Preparation of swine for the laboratory.
Smith, Alison C; Swindle, M Michael
2006-01-01
Swine are an important model in many areas of biomedical research. These animals have been used predominantly as preclinical models involving surgical and interventional protocols. The systems most commonly studied include cardiovascular, integumentary, digestive, and urological. Swine are intelligent social animals and require species-specific socialization and handling techniques. It is important to acclimate the animals to the facility and to personnel before they are placed on chronic protocols. Gentle handling techniques instead of forceful procedures are essential to their socialization. They require sturdy caging with specific construction standards, and toys for environmental enrichment. Because the species is covered by both the Animal Welfare Act and the US Department of Agriculture, interstate transport requires a health certificate with destination state-specific disease screening standards. This manuscript provides an overview of best practices that have been utilized in the authors' facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... to construct a solar photovoltaic (PV) plant facility approximately two miles southeast of Primm... action alternatives would use solar PV technology, although the specific types of arrays and trackers... Statement for the NextLight Renewable Power, LLC, Silver State Solar Project, Primm, NV AGENCY: Bureau of...
40 CFR 270.20 - Specific part B information requirements for land treatment facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...
40 CFR 270.20 - Specific part B information requirements for land treatment facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...
40 CFR 270.20 - Specific part B information requirements for land treatment facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...
40 CFR 270.20 - Specific part B information requirements for land treatment facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...
Code of Federal Regulations, 2012 CFR
2012-01-01
... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...
45 CFR 1309.4 - Eligibility-Construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...
45 CFR 1309.4 - Eligibility-Construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Eligibility-Construction. 1309.4 Section 1309.4... PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION General § 1309.4 Eligibility—Construction. Before submitting an application under § 1309.10 for construction of a facility, the grantee must...
Locations and attributes of wind turbines in Colorado, 2011
Carr, Natasha B.; Diffendorfer, James E.; Fancher, Tammy; Hawkins, Sarah J.; Latysh, Natalie; Leib, Kenneth J.; Matherne, Anne Marie
2013-01-01
This dataset represents an update to U.S. Geological Survey Data Series 597. Locations and attributes of wind turbines in Colorado, 2009 (available at http://pubs.usgs.gov/ds/597/). This updated Colorado wind turbine Data Series provides geospatial data for all 1,204 wind turbines established within the State of Colorado as of September 2011, an increase of 297 wind turbines from 2009. Attributes specific to each turbine include: turbine location, manufacturer and model, rotor diameter, hub height, rotor height, potential megawatt output, land ownership, county, and development status of the wind turbine. Wind energy facility data for each turbine include: facility name, facility power capacity, number of turbines associated with each facility to date, facility developer, facility ownership, and year the facility went online. The locations of turbines are derived from 1-meter true-color aerial photographs produced by the National Agriculture Imagery Program (NAIP); the photographs have a positional accuracy of about ±5 meters. Locations of turbines constructed during or prior to August 2009 are based on August 2009 NAIP imagery and turbine locations constructed after August 2009 were based on September 2011 NAIP imagery. The location of turbines under construction during September 2011 likely will be less accurate than the location of existing turbines. This data series contributes to an Online Interactive Energy Atlas developed by the U.S. Geological Survey (http://my.usgs.gov/eerma/). The Energy Atlas synthesizes data on existing and potential energy development in Colorado and New Mexico and includes additional natural resource data layers. This information may be used by decisionmakers to evaluate and compare the potential benefits and tradeoffs associated with different energy development strategies or scenarios. Interactive maps, downloadable data layers, comprehensive metadata, and decision-support tools also are included in the Energy Atlas. The format of the Energy Atlas is designed to facilitate the integration of information about energy with key terrestrial and aquatic resources for evaluating resource values and minimizing risks from energy development.
Locations and attributes of wind turbines in New Mexico, 2011
Carr, Natasha B.; Diffendorfer, James B.; Fancher, Tammy; Hawkins, Sarah J.; Latysh, Natalie; Leib, Kenneth J.; Matherne, Anne Marie
2013-01-01
This dataset represents an update to U.S. Geological Survey Data Series 596. Locations and attributes of wind turbines in New Mexico, 2009 (available at http://pubs.usgs.gov/ds/596/).This updated New Mexico wind turbine Data Series provides geospatial data for all 562 wind turbines established within the State of New Mexico as of June 2011, an increase of 155 wind turbines from 2009. Attributes specific to each turbine include: turbine location, manufacturer and model, rotor diameter, hub height, rotor height, potential megawatt output, land ownership, county, and development status of wind turbine. Wind energy facility data for each turbine include: facility name, facility power capacity, number of turbines associated with each facility to date, facility developer, facility ownership, and year the facility went online. The locations of turbines are derived from 1-meter true-color aerial photographs produced by the National Agriculture Imagery Program (NAIP); the photographs have a positional accuracy of about ±5 meters. The locations of turbines constructed during or prior to August 2009 are based on August 2009 NAIP imagery and turbine locations constructed after August 2009 were based June 2011 NAIP imagery. The location of turbines under construction during June 2011 likely will be less accurate than the location of existing turbines. This data series contributes to an Online Interactive Energy Atlas developed by the U.S. Geological Survey (http://my.usgs.gov/eerma/). The Energy Atlas synthesizes data on existing and potential energy development in Colorado and New Mexico and includes additional natural resource data layers. This information may be used by decisionmakers to evaluate and compare the potential benefits and tradeoffs associated with different energy development strategies or scenarios. Interactive maps, downloadable data layers, comprehensive metadata, and decision-support tools also are included in the Energy Atlas. The format of the Energy Atlas is designed to facilitate the integration of information about energy with key terrestrial and aquatic resources for evaluating resource values and minimizing risks from energy development.
22 CFR 217.23 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
22 CFR 217.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
45 CFR 605.23 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false New construction. 605.23 Section 605.23 Public... Accessibility § 605.23 New construction. (a) Design and construction. Each facility or part of a facility... persons, if the construction was commenced after the effective date of this part. (b) Alteration. Each...
Space Nuclear Thermal Propulsion (SNTP) Air Force facility
NASA Technical Reports Server (NTRS)
Beck, David F.
1993-01-01
The Space Nuclear Thermal Propulsion (SNTP) Program is an initiative within the US Air Force to acquire and validate advanced technologies that could be used to sustain superior capabilities in the area or space nuclear propulsion. The SNTP Program has a specific objective of demonstrating the feasibility of the particle bed reactor (PBR) concept. The term PIPET refers to a project within the SNTP Program responsible for the design, development, construction, and operation of a test reactor facility, including all support systems, that is intended to resolve program technology issues and test goals. A nuclear test facility has been designed that meets SNTP Facility requirements. The design approach taken to meet SNTP requirements has resulted in a nuclear test facility that should encompass a wide range of nuclear thermal propulsion (NTP) test requirements that may be generated within other programs. The SNTP PIPET project is actively working with DOE and NASA to assess this possibility.
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, G.C.
The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less
ERIC Educational Resources Information Center
Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.
It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…
42 CFR 57.1501 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Loan Guarantees and Interest Subsidies to Assist in Construction of Teaching Facilities for Health Profession Personnel § 57.1501... construction of teaching facilities for health professions personnel. ...
ERIC Educational Resources Information Center
Ponessa, Joan; Boylan, Ellen
2004-01-01
This report on preschool facilities analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State Supreme Court's…
1994-03-31
overhead water sprinklers in enclosed personnel areas not already protected by existing facility fire suppression systems. Sprinkler systems shall not...facilitate future changes and updates to remain current with the application aircraft. 3.4.4 Availabilit . The ARWA SS shall be designed and constructed to
2012-05-11
Instructor Rob Mortin watches as Stennis Space Center firefighters Lt. Greg Lampley, Rodney Boone, Vance Forrest and Billy Scarborough practice high-angle rope rescue techniques during a May 11, 2012, training exercise. The exercise specifically focused on scenarios applicable to the 300-foot-tall, open-steel-structure A-3 Test Stand under construction at the rocket engine test facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Hoesen, S.D.; Bolinsky, J.
1989-08-02
The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less
7 CFR 15b.19 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 1 2014-01-01 2014-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
7 CFR 15b.19 - New construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...
48 CFR 1830.7002 - Facilities capital employed for facilities under construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Facilities capital employed for facilities under construction. 1830.7002 Section 1830.7002 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING...
Mixed Oxide Fresh Fuel Package Auxiliary Equipment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yapuncich, F.; Ross, A.; Clark, R.H.
2008-07-01
The United States Department of Energy's National Nuclear Security Administration (NNSA) is overseeing the construction the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) on the Savannah River Site. The new facility, being constructed by NNSA's contractor Shaw AREVA MOX Services, will fabricate fuel assemblies utilizing surplus plutonium as feedstock. The fuel will be used in designated commercial nuclear reactors. The MOX Fresh Fuel Package (MFFP), which has recently been licensed by the Nuclear Regulatory Commission (NRC) as a type B package (USA/9295/B(U)F-96), will be utilized to transport the fabricated fuel assemblies from the MFFF to the nuclear reactors. It wasmore » necessary to develop auxiliary equipment that would be able to efficiently handle the high precision fuel assemblies. Also, the physical constraints of the MFFF and the nuclear power plants require that the equipment be capable of loading and unloading the fuel assemblies both vertically and horizontally. The ability to reconfigure the load/unload evolution builds in a large degree of flexibility for the MFFP for the handling of many types of both fuel and non fuel payloads. The design and analysis met various technical specifications including dynamic and static seismic criteria. The fabrication was completed by three major fabrication facilities within the United States. The testing was conducted by Sandia National Laboratories. The unique design specifications and successful testing sequences will be discussed. (authors)« less
49 CFR 37.41 - Construction of transportation facilities by public entities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... public entities. 37.41 Section 37.41 Transportation Office of the Secretary of Transportation... transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in providing designated public transportation services so that the facility is readily accessible to and usable...
49 CFR 37.9 - Standards for accessible transportation facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...
49 CFR 37.9 - Standards for accessible transportation facilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...
49 CFR 37.9 - Standards for accessible transportation facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...
49 CFR 37.9 - Standards for accessible transportation facilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...
49 CFR 37.9 - Standards for accessible transportation facilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...
Preparing for a Semiannual IACUC Inspection of a Satellite Zebrafish (Danio rerio) Facility
Koerber, Amy S; Kalishman, Jennifer
2009-01-01
Institutions worldwide have experienced a rapid growth in the use of zebrafish as a research model for a variety of molecular and genetic studies of vertebrate development. This expansion in zebrafish research essentially has outpaced the establishment of specific recommendations for the care and use of fish in research. In some cases, this situation has created a dilemma where an Institutional Animal Care and Use Committee, which is responsible for oversight of vertebrate animal research, is not fully prepared to undertake this role for a decentralized zebrafish facility. IACUC inspectors will be more equipped to ask pertinent questions by understanding the basic principles of zebrafish health and facility management. Concurrently, zebrafish facility managers can contribute to the progress of a semiannual facility inspection by maintaining fully accessible operating records. In the context of presenting a well-established and useful model of zebrafish management and recordkeeping to the zebrafish facility operator, the information we present here also prepares a potential IACUC inspector to conduct a constructive and positive inspection. PMID:19245754
Postirradiation Testing Laboratory (327 Building)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kammenzind, D.E.
A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompassmore » health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.« less
NASA Technical Reports Server (NTRS)
Hanley, G.
1979-01-01
Specific areas were analyzed and identified as high priority for more in-depth analysis. These areas were: (1) rectenna constructability; (2) satellite constructability; (3) support systems constructability; (4) space environmental analysis, and (5) special end-to-end analyses. Baseline requirements specified coplanar solar blankets and an end mounted antenna, utilizing either GaAlAs solar cells and employing a CR of 2, or Si cells. Several configurations were analyzed. Utilizing the preferred configuration as a baseline, a satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Since the baseline specifies sixty instead of one hundred and twenty satellites to be constructed in a thirty year period, mass flow to orbit requirements were revised and new traffic models established. Launch site requirements (exclusive of actual launch operations) in terms of manpower and building space were defined.
14 CFR § 1251.302 - New construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OF HANDICAP Accessibility § 1251.302 New construction. (a) Design and construction. Each facility or... handicapped persons, if the construction (ground breaking) was commenced after the effective date of this part... manner that the altered portion of the facility is readily accessible to and usable by handicapped...
ERIC Educational Resources Information Center
Ponessa, Joan
2004-01-01
This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…
Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Vliet, James A.
2012-07-01
During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facilitymore » consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)« less
25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN ...
25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN WHEN STRUCTURE WAS 99 PERCENT COMPLETE. INEEL PHOTO NUMBER NRTS-60-5409. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... visit; Brief update on school facilities FY11 budget; Review any language drafted by Committee members... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs No Child Left Behind School Facilities and... of Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction...
2013-05-01
Environment ( MDE ) and the Army Corps of Engineers, shows that this specific site is not developed. At this time, the site is covered by a mature mixed... MDE . During the EA development process, other alternative locations, as noted in paragraph 2.2, were reviewed under the requirements of the...DOD 2012 Unified Facilities Criteria. DOD Minimum Antiterrorism Standards for Buildings. UFC 4- 010-01. February 2012. MDE 2011 Maryland Non
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
ERIC Educational Resources Information Center
Ohio School Facilities Commission, Columbus.
This manual presents guidance to facility designers, school administrators, staff, and students for the development of school facilities being constructed under Ohio's Classroom Facilities Assistance Program. It provides critical analysis of individual spaces and material/system components necessary for the construction of elementary and secondary…
Code of Federal Regulations, 2011 CFR
2011-07-01
... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources BUREAU OF... Requirements Activities Under An Approved Cop § 285.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to MMS the documents listed in the following...
Code of Federal Regulations, 2014 CFR
2014-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2013 CFR
2013-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2012 CFR
2012-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Construction and Organization of a BSL-3 Cryo-Electron Microscopy Laboratory at UTMB
Sherman, Michael B.; Trujillo, Juan; Leahy, Ian; Razmus, Dennis; DeHate, Robert; Lorcheim, Paul; Czarneski, Mark A.; Zimmerman, Domenica; Newton, Je T’Aime M.; Haddow, Andrew D.; Weaver, Scott C.
2013-01-01
A unique cryo-electron microscopy facility has been designed and constructed at the University of Texas Medical Branch (UTMB) to study the three-dimensional organization of viruses and bacteria classified as select agents at biological safety level (BSL)-3, and their interactions with host cells. A 200 keV high-end cryo-electron microscope was installed inside a BSL-3 containment laboratory and standard operating procedures were developed and implemented to ensure its safe and efficient operation. We also developed a new microscope decontamination protocol based on chlorine dioxide gas with a continuous flow system, which allowed us to expand the facility capabilities to study bacterial agents including spore-forming species. The new unified protocol does not require agent-specific treatment in contrast to the previously used heat decontamination. To optimize the use of the cryo-electron microscope and to improve safety conditions, it can be remotely controlled from a room outside of containment, or through a computer network world-wide. Automated data collection is provided by using JADAS (single particle imaging) and SerialEM (tomography). The facility has successfully operated for more than a year without an incident and was certified as a select agent facility by the Centers for Disease Control. PMID:23274136
NASA Technical Reports Server (NTRS)
Wieland, P. O.; Roman, M. C.; Miller, L.
2007-01-01
On board the International Space Station, heat generated by the crew and equipment is removed by the internal active thermal control system to maintain a comfortable working environment and prevent equipment overheating. Test facilities simulating the internal active thermal control system (IATCS) were constructed at the Marshall Space Flight Center as part of the sustaining engineering activities to address concerns related to operational issues, equipment capability, and reliability. A full-scale functional simulator of the Destiny lab module IATCS was constructed and activated prior to launch of Destiny in 2001. This facility simulates the flow and thermal characteristics of the flight system and has a similar control interface. A subscale simulator was built, and activated in 2000, with special attention to materials and proportions of wetted surfaces to address issues related to changes in fluid chemistry, material corrosion, and microbial activity. The flight issues that have arisen and the tests performed using the simulator facilities are discussed in detail. In addition, other test facilities at the MSFC have been used to perform specific tests related to IATCS issues. Future testing is discussed as well as potential modifications to the simulators to enhance their utility.
Construction and organization of a BSL-3 cryo-electron microscopy laboratory at UTMB.
Sherman, Michael B; Trujillo, Juan; Leahy, Ian; Razmus, Dennis; Dehate, Robert; Lorcheim, Paul; Czarneski, Mark A; Zimmerman, Domenica; Newton, Je T'aime M; Haddow, Andrew D; Weaver, Scott C
2013-03-01
A unique cryo-electron microscopy facility has been designed and constructed at the University of Texas Medical Branch (UTMB) to study the three-dimensional organization of viruses and bacteria classified as select agents at biological safety level (BSL)-3, and their interactions with host cells. A 200keV high-end cryo-electron microscope was installed inside a BSL-3 containment laboratory and standard operating procedures were developed and implemented to ensure its safe and efficient operation. We also developed a new microscope decontamination protocol based on chlorine dioxide gas with a continuous flow system, which allowed us to expand the facility capabilities to study bacterial agents including spore-forming species. The new unified protocol does not require agent-specific treatment in contrast to the previously used heat decontamination. To optimize the use of the cryo-electron microscope and to improve safety conditions, it can be remotely controlled from a room outside of containment, or through a computer network world-wide. Automated data collection is provided by using JADAS (single particle imaging) and SerialEM (tomography). The facility has successfully operated for more than a year without an incident and was certified as a select agent facility by the Centers for Disease Control. Copyright © 2012 Elsevier Inc. All rights reserved.
The National Ignition Facility and Industry
NASA Astrophysics Data System (ADS)
Harri, J. G.; Paisner, J. A.; Lowdermilk, W. H.; Boyes, J. D.; Kumpan, S. A.; Sorem, M. S.
1994-09-01
The mission of the National Ignition Facility is to achieve ignition and gain in inertial confinement fusion targets in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects testing, and for civilian applications such as fusion energy development and fundamental studies of matter at high temperatures and densities. The National Ignition Facility construction project will require the best of our construction industries and its success will depend on the best products offered by hundreds of the nation's high technology companies. Three-fourths of the construction costs will be invested in industry. This article reviews the design, cost and schedule, and required industrial involvement associated with the construction project.
Achieving and documenting closure in plant growth facilities
NASA Technical Reports Server (NTRS)
Knott, W. M.; Sager, John C.; Wheeler, Ray
1992-01-01
As NASA proceeds with its effort to develop a Controlled Ecological Life Support System (CELSS) that will provide life support to crews during long duration space missions, it must address the question of facility and system closure. The concept of closure as it pertains to CELSS and engineering specifications, construction problems and monitoring procedures used in the development and operation of a closed plant growth facility for the CELSS program are described. A plant growth facility is one of several modules required for a CELSS. A prototype of this module at Kennedy Space Center is the large (7m tall x 3.5m diameter) Biomass Production Chamber (BPC), the central facility of the CELSS Breadboard Project. The BPC is atmospherically sealed to a leak rate of approximately 5 percent of its total volume per 24 hours. This paper will discuss the requirements for atmospheric closure in the facility, present CO2 and trace gas data from initial tests of the BPC with and without plants, and describe how the chamber was sealed atmospherically. Implications that research conducted in this type of facility will have for the CELSS program are discussed.
State and Federal Policies for School Facility Construction: A Comparison of Michigan and Ohio
ERIC Educational Resources Information Center
Davis, Thomas E.
2015-01-01
Background: The Ohio School Facilities Commission was set up in response to litigation compelling the state to achieve a more equitable distribution in the quality of school facilities. The American Recovery and Reinvestment Act (ARRA) was a federal policy to stimulate the United States economy and support school facility construction. These two…
45 CFR 1309.52 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...
Code of Federal Regulations, 2012 CFR
2012-07-01
... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...
45 CFR 1309.52 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION Construction and Major Renovation § 1309.52 Procurement procedures. (a) All facility construction and major renovation transactions...
42 CFR 57.1505 - Approval of applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Loan Guarantees and Interest Subsidies to Assist in Construction of Teaching Facilities for Health Profession... loan, whichever is longer or in the case of interim facilities, the term of the guaranteed loan, and (2...
One of the criteria for selecting a contractor for high-rise construction
NASA Astrophysics Data System (ADS)
Tuskaeva, Zalina; Tagirov, Timur
2018-03-01
The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
NASA Astrophysics Data System (ADS)
Sun, Tianhua; Li, Zhangpeng; Liu, Xiaohong; Ma, Limin; Wang, Jinqing; Yang, Shengrong
2016-11-01
Flower-like molybdenum disulfide (MoS2) microstructures are synthesized based on three-dimensional graphene (3DG) skeleton via a simple and facile one-step hydrothermal method, aiming at constructing series of novel composite electrode materials of 3DG/MoS2 with high electrochemical performances for supercapacitors. The electrochemical properties of the samples are evaluated by cyclic voltammetry and galvanostatic charge/discharge tests. Specifically, the optimal 3DG/MoS2 composite exhibits remarkable performances with a high specific capacitance of 410 F g-1 at a current density of 1 A g-1 and an excellent cycling stability with ca. 80.3% capacitance retention after 10,000 continuous charge-discharge cycles at a high current density of 2 A g-1, making it adaptive for high-performance supercapacitors. The enhanced electrochemical performances can be ascribed to the combination of 3DG and flower-like MoS2, which provides excellent charge transfer network and electrolyte diffusion channels while effectively prevents the collapse, aggregation and morphology change of active materials during charge-discharge process. The results demonstrate that 3DG/MoS2 composite is one of the attractive electrode materials for supercapacitors.
Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Timothy L.
2014-09-01
At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.« less
Health-hazard evaluation report HETA 91-338-2187, IMC Corporation, Sterlington, Louisiana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiefer, M.; Tepper, A.; Miller, R.
1992-03-01
In response to a request from an authorized representative of the Construction and General Laborers Union, Local 762, an investigation was made of potential hazards for asbestos abatement contract workers at IMC Corporation, (SIC-2869), Sterlington, Louisiana. The IMC facility consisted of two ammonia facilities, a nitroparaffin (NP) facility, and a NP derivatives facility. An explosion occurred on May 1, 1991 in the NP facility, caused by a faulty compressor. During the post explosion renovation activities, an asbestos abatement firm was working on site due to the large amounts of asbestos (1332214) insulation which had been disturbed by the explosion. Recordsmore » indicated that several workers complained of ill effects and odors on June 17 and 19. The incidents were investigated but no chemical exposure explanation was found. Routine and complaint based industrial hygiene monitoring was primarily area monitoring and not substance specific. Of the 25 workers interviewed, 22 had symptoms they felt were related to their work at IMC. The symptoms included those of the upper respiratory tract, central nervous system, and gastrointestinal system. The most common included diarrhea, nausea, headache, dizziness, and cough, each experienced by significantly more than half the subjects. The symptoms could not be linked conclusively to any specific chemical release, job task, work location, or food or drink source.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...
34 CFR 361.62 - Maintenance of effort requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... provides for the construction of a facility for community rehabilitation program purposes, the amount of... for the construction of a facility for community rehabilitation program purposes or the establishment of a facility for community rehabilitation purposes, must be at least equal to the expenditures for...
34 CFR 361.62 - Maintenance of effort requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... provides for the construction of a facility for community rehabilitation program purposes, the amount of... for the construction of a facility for community rehabilitation program purposes or the establishment of a facility for community rehabilitation purposes, must be at least equal to the expenditures for...
Enterprise-wide worklist management.
Locko, Roberta C; Blume, Hartwig; Goble, John C
2002-01-01
Radiologists in multi-facility health care delivery networks must serve not only their own departments but also departments of associated clinical facilities. We describe our experience with a picture archiving and communication system (PACS) implementation that provides a dynamic view of relevant radiological workload across multiple facilities. We implemented a distributed query system that permits management of enterprise worklists based on modality, body part, exam status, and other criteria that span multiple compatible PACSs. Dynamic worklists, with lesser flexibility, can be constructed if the incompatible PACSs support specific DICOM functionality. Enterprise-wide worklists were implemented across Generations Plus/Northern Manhattan Health Network, linking radiology departments of three hospitals (Harlem, Lincoln, and Metropolitan) with 1465 beds and 4260 ambulatory patients per day. Enterprise-wide, dynamic worklist management improves utilization of radiologists and enhances the quality of care across large multi-facility health care delivery organizations. Integration of other workflow-related components remain a significant challenge.
10 CFR 2.104 - Notice of hearing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate.
Presented is the 1975 amendment to the Developmental Disabilities Services and Facilities Construction Act. Described are revisions and extensions of the earlier act, including revision of grant and construction assistance for university affiliated facilities, and revision of special projects assistance. The earlier act's designation of rights of…
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...
40 CFR 7.70 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...
40 CFR 7.70 - New construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...
40 CFR 7.70 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...
40 CFR 7.70 - New construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...
40 CFR 7.70 - New construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...
7 CFR 1710.106 - Uses of loan funds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... be used to finance: (1) Distribution facilities. (i) The construction of new distribution facilities... station service, and the borrower is unable to finance the acquisition from other sources. See § 1710.107... by a borrower to finance the construction of generation and transmission facilities during the period...
Deployment, release and recovery of ocean riser pipes
Person, Abraham; Wetmore, Sherman B.; McNary, James F.
1980-11-18
An ocean thermal energy conversion facility includes a long pipe assembly which is supported at its upper end by the hull of the floating facility. Cold water flows to the facility from deep in the ocean. The pipe assembly comprises an elongate pipe construction and a weight connected to the lower end of the construction by a line of selected length. A floatation collar is connected to the construction at its upper end to cause the construction to have positive buoyancy and a center of buoyancy closer to the upper end of the construction than its center of mass. The weight renders the entire pipe assembly negatively buoyant. In the event that support of the pipe assembly should be lost, as by release of the assembly from the facility hull in an emergency, the assembly sinks to the ocean floor where it is moored by the weight. The pipe construction floats submerged above the ocean floor in a substantially vertical attitude which facilitates recovery of the assembly.
A modern depleted uranium manufacturing facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zagula, T.A.
1995-07-01
The Specific Manufacturing Capabilities (SMC) Project located at the Idaho National Engineering Laboratory (INEL) and operated by Lockheed Martin Idaho Technologies Co. (LMIT) for the Department of Energy (DOE) manufactures depleted uranium for use in the U.S. Army MIA2 Abrams Heavy Tank Armor Program. Since 1986, SMC has fabricated more than 12 million pounds of depleted uranium (DU) products in a multitude of shapes and sizes with varying metallurgical properties while maintaining security, environmental, health and safety requirements. During initial facility design in the early 1980`s, emphasis on employee safety, radiation control and environmental consciousness was gaining momentum throughout themore » DOE complex. This fact coupled with security and production requirements forced design efforts to focus on incorporating automation, local containment and computerized material accountability at all work stations. The result was a fully automated production facility engineered to manufacture DU armor packages with virtually no human contact while maintaining security, traceability and quality requirements. This hands off approach to handling depleted uranium resulted in minimal radiation exposures and employee injuries. Construction of the manufacturing facility was complete in early 1986 with the first armor package certified in October 1986. Rolling facility construction was completed in 1987 with the first certified plate produced in the fall of 1988. Since 1988 the rolling and manufacturing facilities have delivered more than 2600 armor packages on schedule with 100% final product quality acceptance. During this period there was an annual average of only 2.2 lost time incidents and a single individual maximum radiation exposure of 150 mrem. SMC is an example of designing and operating a facility that meets regulatory requirements with respect to national security, radiation control and personnel safety while achieving production schedules and product quality.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galowitz, Stephen
The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven andmore » reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). 3) The Project will annually produce 365,292 MWh's of clean energy. 4) By destroying the methane in the landfill gas, the Project will generate CO{sub 2} equivalent reductions of 164,938 tons annually. The completed facility produces 28.3 MWnet and operates 24 hours a day, seven days a week.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center... facilities, Central Office (except Office of Construction and Facilities Management), the National... takes exception to the accord and satisfaction language VA specifies, assignment of claims, changes to...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, D. D.; Farmer, M. T.; Lomperski, S.
The Natural convection Shutdown heat removal Test Facility (NSTF) is a large scale thermal hydraulics test facility that has been built at Argonne National Laboratory (ANL). The facility was constructed in order to carry out highly instrumented experiments that can be used to validate the performance of passive safety systems for advanced reactor designs. The facility has principally been designed for testing of Reactor Cavity Cooling System (RCCS) concepts that rely on natural convection cooling for either air or water-based systems. Standing 25-m in height, the facility is able to supply up to 220 kW at 21 kW/m 2 tomore » accurately simulate the heat fluxes at the walls of a reactor pressure vessel. A suite of nearly 400 data acquisition channels, including a sophisticated fiber optic system for high density temperature measurements, guides test operations and provides data to support scaling analysis and modeling efforts. Measurements of system mass flow rate, air and surface temperatures, heat flux, humidity, and pressure differentials, among others; are part of this total generated data set. The following report provides an introduction to the top level-objectives of the program related to passively safe decay heat removal, a detailed description of the engineering specifications, design features, and dimensions of the test facility at Argonne. Specifications of the sensors and their placement on the test facility will be provided, along with a complete channel listing of the data acquisition system.« less
NASA Astrophysics Data System (ADS)
Guiquan, Xi; Lin, Cong; Xuehui, Jin
2018-05-01
As an important platform for scientific and technological development, large -scale scientific facilities are the cornerstone of technological innovation and a guarantee for economic and social development. Researching management of large-scale scientific facilities can play a key role in scientific research, sociology and key national strategy. This paper reviews the characteristics of large-scale scientific facilities, and summarizes development status of China's large-scale scientific facilities. At last, the construction, management, operation and evaluation of large-scale scientific facilities is analyzed from the perspective of sustainable development.
7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... which will contribute to the preservation and enhancement of sites, structures, and objects of...-96-1, “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” 1987 Edition.... Owners may accomplish construction by using their own personnel and equipment provided the owners possess...
Tribal Child Care Facilities: A Guide to Construction and Renovation.
ERIC Educational Resources Information Center
National Child Care Information Center, Vienna, VA.
This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... implementing both short-range and long-range projects. Proposed facility improvements and phased construction... Institute Foreign Language Center (DLIFLC). Facilities, construction, improvements, renovations... have modern facilities consistent with Army standards well into the 21st Century. The overall goal is...
NASA's Advanced Life Support Systems Human-Rated Test Facility
NASA Technical Reports Server (NTRS)
Henninger, D. L.; Tri, T. O.; Packham, N. J.
1996-01-01
Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.
Test and training simulator for ground-based teleoperated in-orbit servicing
NASA Technical Reports Server (NTRS)
Schaefer, Bernd E.
1989-01-01
For the Post-IOC(In-Orbit Construction)-Phase of COLUMBUS it is intended to use robotic devices for the routine operations of ground-based teleoperated In-Orbit Servicing. A hardware simulator for verification of the relevant in-orbit operations technologies, the Servicing Test Facility, is necessary which mainly will support the Flight Control Center for the Manned Space-Laboratories for operational specific tasks like system simulation, training of teleoperators, parallel operation simultaneously to actual in-orbit activities and for the verification of the ground operations segment for telerobotics. The present status of definition for the facility functional and operational concept is described.
Myers, T J; Kytömaa, H K; Smith, T R
2007-04-11
Fiberglass reinforced plastic (FRP) composite materials are often used to construct tanks, piping, scrubbers, beams, grating, and other components for use in corrosive environments. While FRP typically offers superior and cost effective corrosion resistance relative to other construction materials, the glass fibers traditionally used to provide the structural strength of the FRP can be susceptible to attack by the corrosive environment. The structural integrity of traditional FRP components in corrosive environments is usually dependent on the integrity of a corrosion-resistant barrier, such as a resin-rich layer containing corrosion resistant glass fibers. Without adequate protection, FRP components can fail under loads well below their design by an environmental stress-corrosion cracking (ESCC) mechanism when simultaneously exposed to mechanical stress and a corrosive chemical environment. Failure of these components can result in significant releases of hazardous substances into plants and the environment. In this paper, we present two case studies where fiberglass components failed due to ESCC at small chemical manufacturing facilities. As is often typical, the small chemical manufacturing facilities relied largely on FRP component suppliers to determine materials appropriate for the specific process environment and to repair damaged in-service components. We discuss the lessons learned from these incidents and precautions companies should take when interfacing with suppliers and other parties during the specification, design, construction, and repair of FRP components in order to prevent similar failures and chemical releases from occurring in the future.
42 CFR 57.1509 - Forms of credit and security instruments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Loan Guarantees and Interest Subsidies to Assist in Construction of Teaching Facilities for Health Profession...
DOE Office of Scientific and Technical Information (OSTI.GOV)
2006-10-25
The purpose of the eXtended MetaData Registry (XMDR) prototype is to demonstrate the feasibility and utility of constructing an extended metadata registry, i.e., one which encompasses richer classification support, facilities for including terminologies, and better support for formal specification of semantics. The prototype registry will also serve as a reference implementation for the revised versions of ISO 11179, Parts 2 and 3 to help guide production implementations.
1989-08-01
Programming Languages Used: AUTOCAD Command, AUTOLISP Type of Commercial Program Used: CAD Specific Commercial Program Used: AUTOCAD Version: 1.0...collection which the system can directly translate into printed reports. This eliminates the need for filling data collection forms and manual compiling of
48 CFR 833.212 - Contracting officer's duties upon appeal.
Code of Federal Regulations, 2010 CFR
2010-10-01
... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...
48 CFR 833.212 - Contracting officer's duties upon appeal.
Code of Federal Regulations, 2011 CFR
2011-10-01
... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...
48 CFR 833.212 - Contracting officer's duties upon appeal.
Code of Federal Regulations, 2012 CFR
2012-10-01
... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...
48 CFR 833.212 - Contracting officer's duties upon appeal.
Code of Federal Regulations, 2014 CFR
2014-10-01
... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...
48 CFR 833.212 - Contracting officer's duties upon appeal.
Code of Federal Regulations, 2013 CFR
2013-10-01
... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... Environmental Impact Statement for the Proposed Construction of the Western Wake Regional Wastewater Management Facilities; Which Includes Regional Wastewater Pumping, Conveyance, Treatment, and Discharge Facilities To... Environmental Impact Statement for the proposed construction of the Western Wake Regional Wastewater Management...
10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs
Code of Federal Regulations, 2010 CFR
2010-01-01
... average megawatts or more over a 12 month period. This applies to power marketing operations and to siting... Systems D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities D3. Siting/construction/operation/decommissioning of uranium enrichment facilities D4. Siting/construction...
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2014-10-01 2014-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2013-10-01 2013-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2012-10-01 2012-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2011-10-01 2011-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...
Code of Federal Regulations, 2014 CFR
2014-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2011 CFR
2011-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Using PATIMDB to Create Bacterial Transposon Insertion Mutant Libraries
Urbach, Jonathan M.; Wei, Tao; Liberati, Nicole; Grenfell-Lee, Daniel; Villanueva, Jacinto; Wu, Gang; Ausubel, Frederick M.
2015-01-01
PATIMDB is a software package for facilitating the generation of transposon mutant insertion libraries. The software has two main functions: process tracking and automated sequence analysis. The process tracking function specifically includes recording the status and fates of multiwell plates and samples in various stages of library construction. Automated sequence analysis refers specifically to the pipeline of sequence analysis starting with ABI files from a sequencing facility and ending with insertion location identifications. The protocols in this unit describe installation and use of PATIMDB software. PMID:19343706
HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY
DOE Office of Scientific and Technical Information (OSTI.GOV)
M.A. Ebadian
1999-07-31
FIU-HCET personnel visited the Special Technologies Laboratory (STL) for discussions with the Principal Investigator (PI) of Laser Induced Fluorescence Imaging (LIFI) and for training in LIFI. Mr. Peter Gibbons, Tanks Retrieval Technology Integration Manager, visited FIU-HCET on July 20, 1999. Mr. Gibbons inspected the pipeline unplugging experimental facility at the HCET testing field. The detailed test bed construction, testing plan, and plugging material specifications were discussed.
2005-09-01
G Ot-T GOO) D. BRENT WILSON, P.E. Base Civil Engineer Kirtland Air Force Base Kirtland AFB Fuel Storage and Ofjloading Facilities Construction...September 2005 A-1 3 77 MSG/CEVQ DEPARTMENT OF THE AIR FORCE 3 77th Civil Engineer Division (AFMC) 2050 Wyoming Blvd SE, Suite 120 Kirtland AFB NM...FINAL FINDING OF NO SIGNIFICANT IMPACT FOR THE FOR CONSTRUCTION AND REP AIR OF FUEL STORAGE AND OFFLOADING FACILITIES AT KIRTLAND AIR FORCE
Moly99 Production Facility: Report on Beamline Components, Requirements, Costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bishofberger, Kip A.
2015-12-23
In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introducedmore » briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.« less
42 CFR 57.1512 - Length and maturity of loans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Loan Guarantees... shall a loan repayment period exceed the useful life of the facility to be constructed with the...
34 CFR 222.19 - What other statutes and regulations apply to this part?
Code of Federal Regulations, 2011 CFR
2011-07-01
... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...
34 CFR 222.19 - What other statutes and regulations apply to this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...
34 CFR 222.19 - What other statutes and regulations apply to this part?
Code of Federal Regulations, 2013 CFR
2013-07-01
... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...
34 CFR 222.19 - What other statutes and regulations apply to this part?
Code of Federal Regulations, 2014 CFR
2014-07-01
... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities...) or section 8008 (school facilities). (ii) Section 75.605 does not apply to payments under section... renovations or to construct new school facilities. (2) 34 CFR part 77 (Definitions that Apply to Department...
An investigation of ADA compliance of aquatic facilities in the North Texas area.
Pike, Hilary; Walker, Joseph; Collins, John; Hodges, Jan
2008-01-01
The study expands research on accessibility, comparing compliance scores of aquatic facilities in North Texas built before the 1991 Title III Americans with Disabilities Act Accessibility Guidelines (ADAAG) with facilities built after the 1991 ADAAG and the proposed 2002 supplement. A quasi-experimental design directed the selection of 52 facilities where measurements were taken to determine compliance with ADAAG and the supplement. A focus group provided insight into interpreting which features functioned as barriers or constraints to participation. Metropolitan statistical area in North Texas. A total of 52 aquatic facilities and 12 focus group participants (University of North Texas institutional review board 07-283). ADA aquatic facility compliance instrument. Frequency, ratios. No facilities were 100% ADA compliant overall, although some facilities were 100% compliant with specific structural domains. Women's restrooms rated lowest (average = 55%), and men's restrooms received the second lowest rating (average = 64%). Focus group results indicated that improperly designed restrooms and pool entries are primary barriers to participation. The findings support a need for stronger enforcement of policies that improve accessibility of facilities. Architectural reviews and construction practices need to be improved. The structural barriers and constraints identified can be limiting factors in efforts aimed at increasing physical activity among individuals with disabilities and individuals with physical limitations.
A longitudinal analysis of nursing home outcomes.
Porell, F; Caro, F G; Silva, A; Monane, M
1998-10-01
To investigate resident and facility attributes associated with long-term care health outcomes in nursing homes. Quarterly Management Minutes Questionnaire (MMQ) survey data for Medicaid case-mix reimbursement of nursing homes in Massachusetts from 1991 to 1994, for specification of outcomes and resident attributes. Facility attributes are specified from cost report data. Multivariate logistic and "state-dependence" regression models are estimated for survival, ADL functional status, incontinence status, and mental status outcomes from longitudinal residence histories of Medicaid residents spanning 3 to 36 months in length. Outcomes are specified to be a function of resident demographic and diagnostic attributes and facility-level operating and nurse staffing attributes. The estimated parameters for resident demographic and diagnostic attributes showed a great deal of construct validity with respect to clinical expectations regarding risk factors for adverse outcomes. Few facility attributes were associated with outcomes generally, and none was significantly associated with all four outcomes. The absence of uniform associations between facility attributes and the various long-term care health outcomes studied suggests that strong facility performance on one health outcome may coexist with much weaker performance on other outcomes. This has implications for the aggregation of individual facility performance measures on multiple outcomes and the development of overall outcome performance measures.
Negotiating the sale and purchase of landfill gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Opdahl, C.D.
1995-08-01
This paper discusses many of the business and legal issues which may be encountered in negotiating an agreement for the sale and purchase of landfill gas. A landfill gas sale and purchase contract is really three different agreements wrapped up into one. First, it is a purchase agreement. As a purchase agreement it specifies the parties` obligations about the quantity and quality of the commodity being purchased and sold. It also sets forth the price to be paid for the commodity, payment terms, warranty provisions, indemnification obligations and other matters commonly found in purchase and sale transactions. Second, a landfillmore » gas sale and purchase agreement is a construction agreement. As a construction agreement it obligates the parties to each construct a facility, one facility to collect the gas and the other to generate electricity from consumption of the gas. It also should require the construction of the projects in accordance with approved plans and specifications, in a timely manner and in accordance with applicable laws and ordinances. Third, a landfill gas sale and purchase agreement is a lease or easement agreement. As a lease or easement agreement it requires one party to grant use of a portion of its property to the other party. Also, it sets out the circumstances which will allow landowner to extinguish the right to use or occupy its property, as well as any rights of the land user to maintain or have rights to access to the property and any rights of first refusal. In certain instances it might provide for the grant of security interests as to one of the party`s assets or the entire facility. This paper discusses how these three types of agreements are combined in a single agreement.« less
NASA Technical Reports Server (NTRS)
Edwards, Daryl A.
2008-01-01
Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2's support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed in the early 1960s to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Exhaust system performance, including understanding the present facility capabilities, is the primary focus of this work. A variety of approaches and analytical tools are being employed to gain this understanding. This presentation discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.
Template-Directed Ligation of Peptides to Oligonucleotides
NASA Technical Reports Server (NTRS)
Bruick, Richard K.; Dawson, Philip E.; Kent, Stephen BH; Usman, Nassim; Joyce, Gerald F.
1996-01-01
Synthetic oligonucleotides and peptides have enjoyed a wide range of applications in both biology and chemistry. As a consequence, oligonucleotide-peptide conjugates have received considerable attention, most notably in the development of antisense constructs with improved pharmacological properties. In addition, oligonucleotide-peptide conjugates have been used as molecular tags, in the assembly of supramolecular arrays and in the construction of encoded combinatorial libraries. To make these chimeric molecules more accessible for a broad range of investigations, we sought to develop a facile method for joining fully deprotected oligonucleotides and peptides through a stable amide bond linkage. Furthermore, we wished to make this ligation reaction addressable, enabling one to direct the ligation of specific oligonucleotide and peptide components.To confer specificity and accelerate the rate of the reaction, the ligation process was designed to be dependent on the presence of a complementary oligonucleotide template.
NASA Technical Reports Server (NTRS)
Edwards, Daryl A.
2007-01-01
Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2 s support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed 4 decades ago to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Instrumental in this task is understanding the present facility capabilities and identifying what reasonable changes can be implemented. A variety of approaches and analytical tools are being employed to gain this understanding. This paper discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.
26 CFR 1.179C-1 - Election to expense certain refineries.
Code of Federal Regulations, 2012 CFR
2012-04-01
... facility, crude or product terminal, or blending facility; or (B) The refinery property is built solely to... waiver received by the taxpayer under that Act. (7) Construction of property—(i) In general. Qualified... construction of the property was in effect before June 14, 2005, and if— (A) The construction of the property...
Benchmark studies of induced radioactivity produced in LHC materials, Part I: Specific activities.
Brugger, M; Khater, H; Mayer, S; Prinz, A; Roesler, S; Ulrici, L; Vincke, H
2005-01-01
Samples of materials which will be used in the LHC machine for shielding and construction components were irradiated in the stray radiation field of the CERN-EU high-energy reference field facility. After irradiation, the specific activities induced in the various samples were analysed with a high-precision gamma spectrometer at various cooling times, allowing identification of isotopes with a wide range of half-lives. Furthermore, the irradiation experiment was simulated in detail with the FLUKA Monte Carlo code. A comparison of measured and calculated specific activities shows good agreement, supporting the use of FLUKA for estimating the level of induced activity in the LHC.
Resident's concerns and attitudes towards Solid Waste Management facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rahardyan, B.; Matsuto, T.; Kakuta, Y.
2004-07-01
Because of limited space, the siting and construction of a new SWM facility is a big challenge in Japan. An SWM facility should be socially accepted as well as environmentally and economically sound. This study aimed to investigate people's concerns about SWM facilities and their attitudes towards such facilities. A questionnaire was designed based on literature reviews and was sent to residents in three municipalities with different backgrounds. The questions covered concerns on the impact of an SWM facility, management aspects, unfairness of facility siting, and attitudes to facility construction. Of the many concerns, 'pollution and health effect' had themore » highest rating, followed by 'reliability', 'damage to nature' and 'cost'. The rating was different between municipalities, reflecting their geographic and social backgrounds. Using factor analysis, correlations among concerns were analyzed, and five principal components were extracted, namely 'pollution', 'nuisance', 'facility management', 'planning of facility', and 'merit/demerit'. Although obvious correlations were not found between individual items of concern and attitudes to construction of a facility, the discriminant analysis indicated dominant concerns of attitudes, but the disagreement between actual impact and citizens were found. As for attributes, the 'opposed' attitude decreased for residents who had visited an SWM facility, even if they had only seen it from outside.« less
Feasibility Investigation for a Solar Power Generation Facility
NASA Technical Reports Server (NTRS)
Nathan, Lakshmi
2010-01-01
The Energy Policy Act of 2005 states that by fiscal year 2013, at least 7.5% of the energy consumed by the government must be renewable energy. In an effort to help meet this goal, Johnson Space Center (JSC) is considering installing a solar power generation facility. The purpose of this project is to conduct a feasibility investigation for such a facility. Because Kennedy Space Center (KSC) has a solar power generation facility, the first step in this investigation is to learn about KSC's facility and obtain information on how it was constructed. After collecting this information, the following must be determined: the amount of power desired, the size of the facility, potential locations for it, and estimated construction and maintenance costs. Contacts with JSC's energy provider must also be established to determine if a partnership would be agreeable to both parties. Lastly, all of this data must be analyzed to decide whether or not JSC should construct the facility. The results from analyzing the data collected indicate that a 200 kW facility would provide enough energy to meet 1% of JSC's energy demand. This facility would require less than 1 acre of land. In the map below, potential locations are shown in green. The solar power facility is projected to cost $2 M. So far, the information collected indicates that such a facility could be constructed. The next steps in this investigation include contacting JSC's energy provider, CenterPoint Energy, to discuss entering a partnership; developing a life cycle cost analysis to determine payback time; developing more detailed plans; and securing funding.
Al Alfy, Ibrahim Mohammad
2013-12-01
A set of ten radioactive well-logging calibration pads were constructed in one of the premises of the Nuclear Materials Authority (NMA), Egypt, at 6th October city. These pads were built for calibrating geophysical well-logging instruments. This calibration facility was conducted through technical assistance and practical support of the International Atomic Energy Agency (IAEA) and (ARCN). There are five uranium pads with three different uranium concentrations and borehole diameters. The other five calibration pads include one from each of the following: blank, potassium, thorium, multi layers and mixed. More than 22 t of various selected Egyptian raw materials were gathered for pad construction from different locations in Egypt. Pad's site and the surrounding area were spectrometrically surveyed before excavation for the construction process of pad-basin floor. They yielded negligible radiation values which are very near to the detected general background. After pad's construction, spectrometric measurements were carried out again in the same locations when the exposed bore holes of the pads were closed. No radioactivity leakage was noticed from the pads. Meanwhile, dose rate values were found to range from 0.12 to 1.26 mS/y. They were measured during the opening of bore holes of the pads. These values depend mainly upon the type and concentration of the pads as well as their borehole diameters. The results of radiospectrometric survey illustrate that the specification of top layers of the pads were constructed according to international standards. © 2013 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg
2017-10-01
Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.
ERIC Educational Resources Information Center
Rexhausen, Jeff
The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…
21. CONSTRUCTION PROGRESS VIEW OF CALCINER VESSEL ON LOW BOY ...
21. CONSTRUCTION PROGRESS VIEW OF CALCINER VESSEL ON LOW BOY EN ROUTE TO FACILITY. INEEL PHOTO NUMBER NRTS-60-2487. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
9. Historic construction view of Building 100. 1956. On file ...
9. Historic construction view of Building 100. 1956. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.
CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less
Ollson, Christopher A; Knopper, Loren D; Whitfield Aslund, Melissa L; Jayasinghe, Ruwan
2014-01-01
The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. This paper presents the results of a comprehensive human health risk assessment for this facility. This assessment was based on extensive sampling of baseline environmental conditions (e.g., collection and analysis of air, soil, water, and biota samples) as well as detailed site specific modeling to predict facility-related emissions of 87 identified contaminants of potential concern. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and for the maximum design capacity (400,000 tonnes per year). For the 140,000 tonnes per year scenario, this assessment indicated that facility-related emissions are unlikely to cause adverse health risks to local residents, farmers, or other receptors (e.g., recreational users). For the 400,000 tonnes per year scenarios, slightly elevated risks were noted with respect to inhalation (hydrogen chloride) and infant consumption of breast milk (dioxins and furans), but only during predicted 'upset conditions' (i.e. facility start-up, shutdown, and loss of air pollution control) that represent unusual and/or transient occurrences. However, current provincial regulations require that additional environmental screening would be mandatory prior to expansion of the facility beyond the initial approved capacity (140,000 tonnes per year). Therefore, the potential risks due to upset conditions for the 400,000 tonnes per year scenario should be more closely investigated if future expansion is pursued. © 2013.
2012-02-17
Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, whichmore » were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.« less
A/E/C CAD Standard, Release 4.0
2009-07-01
Insulating (Transformer) Oil System Lubrication Oil Hot Water Heating System Machine Design Appendix A Model File Level/Layer Assignment Tables A51...of the A /E/C CAD Standard are: “Uniform Drawing System ” The Construction Specifications Institute 99 Canal Center Plaza, Suite 300 Alexandria, VA...FM – Facility Management GIS – Geographic Information System IAI – International Alliance for Interoperability IFC – Industry Foundation
A health maintenance facility for space station freedom
NASA Technical Reports Server (NTRS)
Billica, R. D.; Doarn, C. R.
1991-01-01
We describe a health care facility to be built and used on an orbiting space station in low Earth orbit. This facility, called the health maintenance facility, is based on and modeled after isolated terrestrial medical facilities. It will provide a phased approach to health care for the crews of Space Station Freedom. This paper presents the capabilities of the health maintenance facility. As Freedom is constructed over the next decade there will be an increase in activities, both construction and scientific. The health maintenance facility will evolve with this process until it is a mature, complete, stand-alone health care facility that establishes a foundation to support interplanetary travel. As our experience in space continues to grow so will the commitment to providing health care.
NASA Technical Reports Server (NTRS)
Hanson, P. W.
1980-01-01
The characteristics and capabilities of the two tunnels, that relate to studies in the fields of aeroelasticity and unsteady aerodynamics are discussed. Scaling considerations for aeroelasticity and unsteady aerodynamics testing in the two facilities are reviewed, and some of the special features (or lack thereof) of the Langley Research Center Transonic Dynamics Tunnel (TDT) and the National Transonic Facility (NTF) that will weigh heavily in any decisions conducting a given study in the two tunnels are discussed. For illustrative purposes a fighter and a transport airplane are scaled for tests in the NTF and in the TDT, and the resulting model characteristics are compared. The NTF was designed specifically to meet the need for higher Reynolds number capability for flow simulation in aerodynamic performance testing of aircraft designs. However, the NTF can be a valuable tool for evaluating the severity of Reynolds number effects in the areas of dynamic aeroelasticity and unsteady aerodynamics. On the other hand, the TDT was constructed specifically for studies and tests in the field of aeroelasticity. Except for tests requiring the Reynolds number capability of NTF, the TDT will remain the primary facility for tests of dynamic aeroelasticity and unsteady aerodynamics.
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
28 CFR 91.3 - General eligibility requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...
ERIC Educational Resources Information Center
Buskirk, E. Drannon, Jr.; Cole, Charles A.
Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…
Liquid propulsion turbomachinery model testing
NASA Technical Reports Server (NTRS)
Mcdaniels, David M.; Snellgrove, Lauren M.
1992-01-01
For the past few years an extensive experimental program to understand the fluid dynamics of the Space Shuttle Main Engine hot gas manifold has been in progress. This program includes models of the Phase II and II+ manifolds for each of the air and water flow facilities, as well as two different turbine flow paths and two simulated power levels for each manifold. All models are full-scale (geometric). The water models are constructed partially of acrylic to allow flow visualization. The intent of this paper is to discuss the concept, including the test objectives, facilities, and models, and to summarize the data for an example configuration, including static pressure data, flow visualization, and the solution of a specific flow problem.
Pinon Pine power project nears start-up
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tatar, G.A.; Gonzalez, M.; Mathur, G.K.
1997-12-31
The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing ofmore » the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.« less
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate Committee on Rules and Administration.
This document presents testimony heard on S. 2418, a bill to authorize the Librarian of Congress to construct the Library of Congress Mass Book Deacidification Facility at Fort Detrick, near Frederick, Maryland, subject to the supervision and construction authority of a federal, civilian, or military agency. The facility would be used to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vanvick, T.W.
The Logan Generating Plant (formerly Keystone Cogeneration Project) is a 230 MW (gross) pulverized coal cogeneration facility located on the Delaware River in Logan Township, New Jersey, off Route 130. Owned and operated by U.S. Generating Company, the plant was built by Bechtel Corporation, which provided engineering, procurement, construction, and startup services. Power from the plant is furnished to Atlantic Electric, and approximately 50,000 pounds of process steam per hour is provided to Monsanto`s adjacent facility. U.S. Generating Company is committed to operating plants with close attention to the environment and has developed a specific Environmental Mission Statement. This papermore » addresses some of the key environmental features at the Logan Generating Plant.« less
Wind energy development: methods for assessing risks to birds and bats pre-construction
Katzner, Todd E.; Bennett, Victoria; Miller, Tricia A.; Duerr, Adam E.; Braham, Melissa A.; Hale, Amanda
2016-01-01
Wind power generation is rapidly expanding. Although wind power is a low-carbon source of energy, it can impact negatively birds and bats, either directly through fatality or indirectly by displacement or habitat loss. Pre-construction risk assessment at wind facilities within the United States is usually required only on public lands. When conducted, it generally involves a 3-tier process, with each step leading to more detailed and rigorous surveys. Preliminary site assessment (U.S. Fish and Wildlife Service, Tier 1) is usually conducted remotely and involves evaluation of existing databases and published materials. If potentially at-risk wildlife are present and the developer wishes to continue the development process, then on-site surveys are conducted (Tier 2) to verify the presence of those species and to assess site-specific features (e.g., topography, land cover) that may influence risk from turbines. The next step in the process (Tier 3) involves quantitative or scientific studies to assess the potential risk of the proposed project to wildlife. Typical Tier-3 research may involve acoustic, aural, observational, radar, capture, tracking, or modeling studies, all designed to understand details of risk to specific species or groups of species at the given site. Our review highlights several features lacking from many risk assessments, particularly the paucity of before-and-after-control- impact (BACI) studies involving modeling and a lack of understanding of cumulative effects of wind facilities on wildlife. Both are essential to understand effective designs for pre-construction monitoring and both would help expand risk assessment beyond eagles.
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12124. Unknown Photographer, 9/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Studies of Transgenic Mosquitoes in Disease-Endemic Countries: Preparation of Containment Facilities
Mutunga, James Mutuku; Diabaté, Abdoulaye; Namountougou, Moussa; Coulibaly, Mamadou B.; Sylla, Lakamy; Kayondo, Jonathan; Balyesima, Victor; Clark, Lorna; Benedict, Mark Q.; Raymond, Peter
2018-01-01
Abstract Novel approaches to area-wide control of vector species offer promise as additional tools in the fight against vectored diseases. Evaluation of transgenic insect strains aimed at field population control in disease-endemic countries may involve international partnerships and should be done in a stepwise approach, starting with studies in containment facilities. The preparations of both new-build and renovated facilities are described, including working with local and national regulations regarding land use, construction, and biosafety requirements, as well as international guidance to fill any gaps in regulation. The examples given are for containment categorization at Arthropod Containment Level 2 for initial facility design, classification of wastes, and precautions during shipping. Specific lessons were derived from preparations to evaluate transgenic (non-gene drive) mosquitoes in West and East African countries. Documented procedures and the use of a non-transgenic training strain for trial shipments and culturing were used to develop competence and confidence among the African facility staff, and along the chain of custody for transport. This practical description is offered to support other research consortia or institutions preparing containment facilities and operating procedures in conditions where research on transgenic insects is at an early stage. PMID:29337662
Quinlan, M Megan; Mutunga, James Mutuku; Diabaté, Abdoulaye; Namountougou, Moussa; Coulibaly, Mamadou B; Sylla, Lakamy; Kayondo, Jonathan; Balyesima, Victor; Clark, Lorna; Benedict, Mark Q; Raymond, Peter
2018-01-01
Novel approaches to area-wide control of vector species offer promise as additional tools in the fight against vectored diseases. Evaluation of transgenic insect strains aimed at field population control in disease-endemic countries may involve international partnerships and should be done in a stepwise approach, starting with studies in containment facilities. The preparations of both new-build and renovated facilities are described, including working with local and national regulations regarding land use, construction, and biosafety requirements, as well as international guidance to fill any gaps in regulation. The examples given are for containment categorization at Arthropod Containment Level 2 for initial facility design, classification of wastes, and precautions during shipping. Specific lessons were derived from preparations to evaluate transgenic (non-gene drive) mosquitoes in West and East African countries. Documented procedures and the use of a non-transgenic training strain for trial shipments and culturing were used to develop competence and confidence among the African facility staff, and along the chain of custody for transport. This practical description is offered to support other research consortia or institutions preparing containment facilities and operating procedures in conditions where research on transgenic insects is at an early stage.
Aerial views of construction on the RLV hangar at the Shuttle Landing Facility
NASA Technical Reports Server (NTRS)
1999-01-01
Looking southwest, this view shows ongoing construction of a multi-purpose hangar, which is part of the $8 million Reusable Launch Vehicle (RLV) Support Complex at Kennedy Space Center. Edging the construction is Sharkey Road, which parallels the landing strip of the Shuttle Landing Facility nearby. The RLV complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.
48 CFR 846.471 - Determination authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 846.471 Determination authority. The... Construction and Facilities Management, for those items and services for which purchase authority has been assigned to the Office of Construction and Facilities Management. (b) The Director, Veterans Canteen...
2010-11-24
CAPE CANAVERAL, Fla. -- Construction begins to wrap up at the Propellants North Administrative and Maintenance Facility in the Launch Complex 39 area of NASA's Kennedy Space Center in Florida. This is the facility's two-story administrative building, which will house managers, mechanics and technicians who fuel spacecraft at Kennedy. Next door is a single-story shop that will be used to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification, which is the highest of LEED ratings. The facility, set to be complete in December 2010, was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Frankie Martin
2010-11-24
CAPE CANAVERAL, Fla. -- Construction begins to wrap up at the Propellants North Administrative and Maintenance Facility in the Launch Complex 39 area of NASA's Kennedy Space Center in Florida. This is the facility's two-story administrative building, which will house managers, mechanics and technicians who fuel spacecraft at Kennedy. Next door is a single-story shop that will be used to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification, which is the highest of LEED ratings. The facility, set to be complete in December 2010, was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Frankie Martin
2010-11-24
CAPE CANAVERAL, Fla. -- Construction begins to wrap up at the Propellants North Administrative and Maintenance Facility in the Launch Complex 39 area of NASA's Kennedy Space Center in Florida. On the left is the facility's single-story shop, which will be used to store cryogenic fuel transfer equipment. On the right is a two-story administrative building that will house managers, mechanics and technicians who fuel spacecraft at Kennedy. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification, which is the highest of LEED ratings. The facility, set to be complete in December 2010, was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Frankie Martin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitoun, A.
1994-08-01
This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment aremore » construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.« less
Hardware demonstration of flexible beam control
NASA Technical Reports Server (NTRS)
Schaechter, D. B.
1980-01-01
An experiment employing a pinned-free flexible beam has been constructed to demonstrate and verify several facets of the control of flexible structures. The desired features of the experiment are to demonstrate active shape control, active dynamic control, adaptive control, various control law design approaches, and associated hardware requirements and mechanization difficulties. This paper contains the analytical work performed in support of the facility development, the final design specifications, control law synthesis, and some preliminary results.
Resources of Near-Earth Space: Abstracts
NASA Technical Reports Server (NTRS)
1991-01-01
The objectives are by theory, experiment, and bench-level testing of small systems, to develop scientifically-sound engineering processes and facility specifications for producing propellants and fuels, construction and shielding materials, and life support substances from the lithospheres and atmospheres of lunar, planetary, and asteroidal bodies. Current emphasis is on the production of oxygen, other usefull gases, metallic, ceramic/composite, and related byproducts from lunar regolith, carbonaceous chrondritic asteroids, and the carbon dioxide rich Martian atmosphere.
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12573. R.G. Larsen, Photographer, 10/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING INITIAL ...
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING INITIAL EXCAVATION. INL PHOTO NUMBER NRTS-54-10703. Unknown Photographer, 5/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Payette; D. Tillman
During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less
Validation of Blockage Interference Corrections in the National Transonic Facility
NASA Technical Reports Server (NTRS)
Walker, Eric L.
2007-01-01
A validation test has recently been constructed for wall interference methods as applied to the National Transonic Facility (NTF). The goal of this study was to begin to address the uncertainty of wall-induced-blockage interference corrections, which will make it possible to address the overall quality of data generated by the facility. The validation test itself is not specific to any particular modeling. For this present effort, the Transonic Wall Interference Correction System (TWICS) as implemented at the NTF is the mathematical model being tested. TWICS uses linear, potential boundary conditions that must first be calibrated. These boundary conditions include three different classical, linear. homogeneous forms that have been historically used to approximate the physical behavior of longitudinally slotted test section walls. Results of the application of the calibrated wall boundary conditions are discussed in the context of the validation test.
NASA Astrophysics Data System (ADS)
Yoo, Jongsoo; Jara-Almonte, J.; Majeski, S.; Frank, S.; Ji, H.; Yamada, M.
2016-10-01
FLARE (Facility for Laboratory Reconnection Experiments) will be operated as a flexible user facility, and so a complete set of research diagnostics is under development, including magnetic probe arrays, Langmuir probes, Mach probes, spectroscopic probes, and a laser interferometer. In order to accommodate the various requirements of users, large-scale (1 m), variable resolution (0.5-4 cm) magnetic probes have been designed, and are currently being prototyped. Moreover, a fully fiber-coupled laser interferometer has been designed to measure the line-integrated electron density. This fiber-coupled interferometer system will reduce the complexity of alignment processes and minimize maintenance of the system. Finally, improvements to the electrostatic probes and spectroscopic probes currently used in the Magnetic Reconnection Experiment (MRX) are discussed. The specifications of other subsystems, such as integrators and digitizers, are also presented. This work is supported by DoE Contract No. DE-AC0209CH11466.
The use of NUREGs 1199 and 1200 in the Illinois LLW licensing program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klinger, J.G.; Harmon, D.F.
1991-12-31
This paper will describe how the LLW licensing staff of the Illinois Department of Nuclear Safety used NRC`s NUREG 1199, NUREG 1200, NUREG 1300 and Regulatory Guide 4.18 in its licensing program for reviewing and evaluating a LLW disposal facility license application. The paper will discuss how Illinois guidance documents were prepared based on modifications made to these NRC documents which were necessary to take into account site and facility specific considerations, as well as changes required by Illinois statutes and regulatory codes. The paper will review the recent revisions (January 1991) to NUREG 1199 and 1200 and the importancemore » of these revisions. The paper will also discuss recommended modifications to these NRC documents and provide an update on the status of the Department`s review and evaluation of an application for a license to site, construct and operate a LLW disposal facility in Illinois.« less
Fabulous Facilities: New Constructions and Renovations.
ERIC Educational Resources Information Center
American Libraries, 1997
1997-01-01
Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)
Environmental monitoring handbook for coal conversion facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salk, M.S.; DeCicco, S.G.
1978-05-01
The primary objectives of the Department of Energy's (DOE) coal conversion program are to demonstrate the environmental acceptability, technical feasibility, and economic viability of various technologies for gaseous, liquid, and solid fuels from coal. The Environmental Monitoring Handbook for Coal Conversion Facilities will help accomplish the objective of environmental acceptability by guiding the planning and execution of socioeconomic and environmental monitoring programs for demonstration facilities. These programs will provide information adequate to (1) predict, insofar as is possible, the potential impacts of construction and operation of a coal conversion plant, (2) verify the occurrence of these or any other impactsmore » during construction and operation, (3) determine the adequacy of mitigating measures to protect the environment, (4) develop effluent source terms for process discharges, and (5) determine the effectiveness of pollution control equipment. Although useful in a variety of areas, the handbook is intended primarily for contractors who, as industrial partners with DOE, are building coal conversion plants. For the contractor it is a practical guide on (1) the methodology for developing site- and process-specific environmental monitoring programs, (2) state-of-the-art sampling and analytical techniques, and (3) impact analyses.To correspond to the phases of project activity, the subject matter is divided into four stages of monitoring: (1) a reconnaissance or synoptic survey, (2) preconstruction or baseline, (3) construction, and (4) operation, including process monitoring (prepared by Radian Corp., McLean, Va.). For each stage of monitoring, guidelines are given on socioeconomics, aquatic and terrestrial ecology, air quality and meteorology, surface and groundwater quality, geohydrology and soil survey, and surface water hydrology.« less
42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...
42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...
42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...
42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...
42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...
Ollson, Christopher A; Whitfield Aslund, Melissa L; Knopper, Loren D; Dan, Tereza
2014-01-01
The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste (EFW) thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. In this paper we present the results of a comprehensive ecological risk assessment (ERA) for this planned facility, based on baseline sampling and site specific modeling to predict facility-related emissions, which was subsequently accepted by regulatory authorities. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and the maximum design capacity (400,000 tonnes per year). In general, calculated ecological hazard quotients (EHQs) and screening ratios (SRs) for receptors did not exceed the benchmark value (1.0). The only exceedances noted were generally due to existing baseline media concentrations, which did not differ from those expected for similar unimpacted sites in Ontario. This suggests that these exceedances reflect conservative assumptions applied in the risk assessment rather than actual potential risk. However, under predicted upset conditions at 400,000 tonnes per year (i.e., facility start-up, shutdown, and loss of air pollution control), a potential unacceptable risk was estimated for freshwater receptors with respect to benzo(g,h,i)perylene (SR=1.1), which could not be attributed to baseline conditions. Although this slight exceedance reflects a conservative worst-case scenario (upset conditions coinciding with worst-case meteorological conditions), further investigation of potential ecological risk should be performed if this facility is expanded to the maximum operating capacity in the future. © 2013.
Testing reflective insulation for improvement of buildings energy efficiency
NASA Astrophysics Data System (ADS)
Vrachopoulos, Michalis Gr.; Koukou, Maria K.; Stavlas, Dimitris G.; Stamatopoulos, Vasilis N.; Gonidis, Achilleas F.; Kravvaritis, Eleftherios D.
2012-03-01
Reflective insulation stands as an alternative to common building materials used to reduce a building's heating and cooling loads. In this work, an experimental prototype chamber facility has been designed and constructed at the campus of the Technological Educational Institution of Halkida, located in an area of climatic zone B in Greece, aiming to the evaluation of reflective insulation's performance. Reflective insulation is a part of the test room wall construction, specifically, heat insulation material of the vertical wall construction all directions (North, South, East, West), and temperature and water proofing element of the roof. Measurements were obtained for both winter and summer periods. Results indicate that the existence of reflective insulation during summer period averts the overheating at the interior of the experimental chamber, while during winter the heat is retained in the chamber.
Code of Federal Regulations, 2010 CFR
2010-04-01
... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.20 Buildings. (a) The location, design, construction, and physical size of the buildings and other production facilities are factors important to the manufacture of medicated feed. The features of...
7 CFR 3015.16 - Construction and facility improvement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction and facility improvement. 3015.16 Section 3015.16 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Bonding and Insurance...
A longitudinal analysis of nursing home outcomes.
Porell, F; Caro, F G; Silva, A; Monane, M
1998-01-01
OBJECTIVE: To investigate resident and facility attributes associated with long-term care health outcomes in nursing homes. DATA SOURCES: Quarterly Management Minutes Questionnaire (MMQ) survey data for Medicaid case-mix reimbursement of nursing homes in Massachusetts from 1991 to 1994, for specification of outcomes and resident attributes. Facility attributes are specified from cost report data. STUDY DESIGN: Multivariate logistic and "state-dependence" regression models are estimated for survival, ADL functional status, incontinence status, and mental status outcomes from longitudinal residence histories of Medicaid residents spanning 3 to 36 months in length. Outcomes are specified to be a function of resident demographic and diagnostic attributes and facility-level operating and nurse staffing attributes. PRINCIPAL FINDINGS: The estimated parameters for resident demographic and diagnostic attributes showed a great deal of construct validity with respect to clinical expectations regarding risk factors for adverse outcomes. Few facility attributes were associated with outcomes generally, and none was significantly associated with all four outcomes. CONCLUSIONS: The absence of uniform associations between facility attributes and the various long-term care health outcomes studied suggests that strong facility performance on one health outcome may coexist with much weaker performance on other outcomes. This has implications for the aggregation of individual facility performance measures on multiple outcomes and the development of overall outcome performance measures. PMID:9776939
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING PLACEMENT ...
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING PLACEMENT OF PIERS. INL PHOTO NUMBER NRTS-54-11716. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
DOT National Transportation Integrated Search
2001-11-01
This report describes the test results of the first project at the Louisiana Transportation Research Center's Accelerated Loading Facility (ALF). In 1995, 9 test lanes were constructed at the Louisiana Pavement Research Facility in Port Allen. These ...
A Simple and Efficient Method for Assembling TALE Protein Based on Plasmid Library
Xu, Huarong; Xin, Ying; Zhang, Tingting; Ma, Lixia; Wang, Xin; Chen, Zhilong; Zhang, Zhiying
2013-01-01
DNA binding domain of the transcription activator-like effectors (TALEs) from Xanthomonas sp. consists of tandem repeats that can be rearranged according to a simple cipher to target new DNA sequences with high DNA-binding specificity. This technology has been successfully applied in varieties of species for genome engineering. However, assembling long TALE tandem repeats remains a big challenge precluding wide use of this technology. Although several new methodologies for efficiently assembling TALE repeats have been recently reported, all of them require either sophisticated facilities or skilled technicians to carry them out. Here, we described a simple and efficient method for generating customized TALE nucleases (TALENs) and TALE transcription factors (TALE-TFs) based on TALE repeat tetramer library. A tetramer library consisting of 256 tetramers covers all possible combinations of 4 base pairs. A set of unique primers was designed for amplification of these tetramers. PCR products were assembled by one step of digestion/ligation reaction. 12 TALE constructs including 4 TALEN pairs targeted to mouse Gt(ROSA)26Sor gene and mouse Mstn gene sequences as well as 4 TALE-TF constructs targeted to mouse Oct4, c-Myc, Klf4 and Sox2 gene promoter sequences were generated by using our method. The construction routines took 3 days and parallel constructions were available. The rate of positive clones during colony PCR verification was 64% on average. Sequencing results suggested that all TALE constructs were performed with high successful rate. This is a rapid and cost-efficient method using the most common enzymes and facilities with a high success rate. PMID:23840477
A simple and efficient method for assembling TALE protein based on plasmid library.
Zhang, Zhiqiang; Li, Duo; Xu, Huarong; Xin, Ying; Zhang, Tingting; Ma, Lixia; Wang, Xin; Chen, Zhilong; Zhang, Zhiying
2013-01-01
DNA binding domain of the transcription activator-like effectors (TALEs) from Xanthomonas sp. consists of tandem repeats that can be rearranged according to a simple cipher to target new DNA sequences with high DNA-binding specificity. This technology has been successfully applied in varieties of species for genome engineering. However, assembling long TALE tandem repeats remains a big challenge precluding wide use of this technology. Although several new methodologies for efficiently assembling TALE repeats have been recently reported, all of them require either sophisticated facilities or skilled technicians to carry them out. Here, we described a simple and efficient method for generating customized TALE nucleases (TALENs) and TALE transcription factors (TALE-TFs) based on TALE repeat tetramer library. A tetramer library consisting of 256 tetramers covers all possible combinations of 4 base pairs. A set of unique primers was designed for amplification of these tetramers. PCR products were assembled by one step of digestion/ligation reaction. 12 TALE constructs including 4 TALEN pairs targeted to mouse Gt(ROSA)26Sor gene and mouse Mstn gene sequences as well as 4 TALE-TF constructs targeted to mouse Oct4, c-Myc, Klf4 and Sox2 gene promoter sequences were generated by using our method. The construction routines took 3 days and parallel constructions were available. The rate of positive clones during colony PCR verification was 64% on average. Sequencing results suggested that all TALE constructs were performed with high successful rate. This is a rapid and cost-efficient method using the most common enzymes and facilities with a high success rate.
Discriminative facility and its role in the perceived quality of interactional experiences.
Cheng, C; Chiu, C Y; Hong, Y Y; Cheung, J S
2001-10-01
Discriminative facility refers to an individual's sensitivity to subtle cues about the psychological meaning of a situation. This research aimed at examining (a) the conceptual distinctiveness of discriminative facility, (b) the situation-appropriate aspect of this construct, and (c) the relationship between discriminative facility and interpersonal experiences. Discriminative facility was assessed by a new measure of situation-appropriate behaviors across a variety of novel stressful situations. Results from study 1 showed that discriminative facility had weak positive relationships with cognitive complexity and nonsignificant relationships with self-monitoring and social desirability, indicating that discriminative facility is a unique construct. Results from Study 2 revealed that higher levels of discriminative facility were associated with higher levels of perceived social support and a greater number of pleasant interpersonal events experienced, thus providing support for the theoretical proposition that discriminative facility is an aspect of social intelligence.
Manhattan Project buildings and facilities at the Hanford Site: A construction history
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerber, M.S.
1993-09-01
This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.
2010-10-14
Water regarding potential sources of t practices to ensure drinking water source protection. u ity design and operating standards would be based...center would not be constructed, and adequate facilities would not be provided. The existing facility would operate as it currently exists...would be properly handled during the construction process. Operational activities would generate the same types of waste as the existing facility
ERIC Educational Resources Information Center
Reynolds, Cathryn
1989-01-01
The combined effect of the "Serrano" decision and Proposition 13 left California school districts with aging, overcrowded facilities. Chico schools won a $18.5 million general obligation bond election for facilities construction. With $11 billion needed for new school construction, California will need to tap local sources. A sidebar…
Activation of the E1 Ultra High Pressure Propulsion Test Facility at Stennis Space Center
NASA Technical Reports Server (NTRS)
Messer, Bradley; Messer, Elisabeth; Sewell, Dale; Sass, Jared; Lott, Jeff; Dutreix, Lionel, III
2001-01-01
After a decade of construction and a year of activation the El Ultra High Pressure Propulsion Test Facility at NASA's Stennis Space Center is fully operational. The El UHP Propulsion Test Facility is a multi-cell, multi-purpose component and engine test facility . The facility is capable of delivering cryogenic propellants at low, high, and ultra high pressures with flow rates ranging from a few pounds per second up to two thousand pounds per second. Facility activation is defined as a series of tasks required to transition between completion of construction and facility operational readiness. Activating the El UHP Propulsion Test Facility involved independent system checkouts, propellant system leak checks, fluid and gas sampling, gaseous system blow downs, pressurization and vent system checkouts, valve stability testing, valve tuning cryogenic cold flows, and functional readiness tests.
Vermeulen, Roel; Coble, Joseph B; Lubin, Jay H; Portengen, Lützen; Blair, Aaron; Attfield, Michael D; Silverman, Debra T; Stewart, Patricia A
2010-10-01
We developed quantitative estimates of historical exposures to respirable elemental carbon (REC) for an epidemiologic study of mortality, including lung cancer, among diesel-exposed miners at eight non-metal mining facilities [the Diesel Exhaust in Miners Study (DEMS)]. Because there were no historical measurements of diesel exhaust (DE), historical REC (a component of DE) levels were estimated based on REC data from monitoring surveys conducted in 1998-2001 as part of the DEMS investigation. These values were adjusted for underground workers by carbon monoxide (CO) concentration trends in the mines derived from models of historical CO (another DE component) measurements and DE determinants such as engine horsepower (HP; 1 HP = 0.746 kW) and mine ventilation. CO was chosen to estimate historical changes because it was the most frequently measured DE component in our study facilities and it was found to correlate with REC exposure. Databases were constructed by facility and year with air sampling data and with information on the total rate of airflow exhausted from the underground operations in cubic feet per minute (CFM) (1 CFM = 0.0283 m³ min⁻¹), HP of the diesel equipment in use (ADJ HP), and other possible determinants. The ADJ HP purchased after 1990 (ADJ HP₁₉₉₀(+)) was also included to account for lower emissions from newer, cleaner engines. Facility-specific CO levels, relative to those in the DEMS survey year for each year back to the start of dieselization (1947-1967 depending on facility), were predicted based on models of observed CO concentrations and log-transformed (Ln) ADJ HP/CFM and Ln(ADJ HP₁₉₉₀(+)). The resulting temporal trends in relative CO levels were then multiplied by facility/department/job-specific REC estimates derived from the DEMS surveys personal measurements to obtain historical facility/department/job/year-specific REC exposure estimates. The facility-specific temporal trends of CO levels (and thus the REC estimates) generated from these models indicated that CO concentrations had been generally greater in the past than during the 1998-2001 DEMS surveys, with the highest levels ranging from 100 to 685% greater (median: 300%). These levels generally occurred between 1970 and the early 1980s. A comparison of the CO facility-specific model predictions with CO air concentration measurements from a 1976-1977 survey external to the modeling showed that our model predictions were slightly lower than those observed (median relative difference of 29%; range across facilities: 49 to -25%). In summary, we successfully modeled past CO concentration levels using selected determinants of DE exposure to derive retrospective estimates of REC exposure. The results suggested large variations in REC exposure levels both between and within the underground operations of the facilities and over time. These REC exposure estimates were in a plausible range and were used in the investigation of exposure-response relationships in epidemiologic analyses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources MINERALS... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop... COP? (a) You must submit to MMS the documents listed in the following table: ER29AP09.124 (b) You must...
Space Habitat, assembly and repair facility
NASA Technical Reports Server (NTRS)
Colangelo, Todd A.; Hoetger, Debora C.; Kuo, Addison C.; Lo, Michael C.; Marcus, Leland R.; Tran, Phillip P.; Tutt, Chris J.; Wassmuth, Chad M.; Wildgrube, Gregory M.
1992-01-01
Integrated Space Systems (ISS) has designed a Low Earth Orbit Assembly Facility for submission in the 1992 AIAA/LORAL Team Space Design Competition. This facility, the Space Habitat, Assembly, and Repair Center (SHARC), will be used to construct, assemble, and service space vehicles. SHARC's primary mission will be the construction of interplanetary vehicles, but it will also be able to perform repair and refueling operations of craft which are in an Earth orbit. This facility has been designed using only present and near-present technology. The emphasis is on minimizing cost.
Mobile/Modular BSL-4 Facilities for Meeting Restricted Earth Return Containment Requirements
NASA Technical Reports Server (NTRS)
Calaway, M. J.; McCubbin, F. M.; Allton, J. H.; Zeigler, R. A.; Pace, L. F.
2017-01-01
NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection Office require sample containment and biohazard testing in a receiving laboratory as directed by NASA Procedural Requirement (NPR) 8020.12D - ensuring the preservation and protection of Earth and the sample. Currently, NPR 8020.12D classifies Restricted Earth Return for robotic sample return missions from Mars, Europa, and Enceladus with the caveat that future proposed mission locations could be added or restrictions lifted on a case by case basis as scientific knowledge and understanding of biohazards progresses. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, Biosafety Level (BSL) 4 standards and protocols are used to study the most dangerous high-risk diseases and unknown biological agents on Earth. Over 30 BSL-4 facilities have been constructed worldwide with 12 residing in the United States; of theses, 8 are operational. In the last two decades, these brick and mortar facilities have cost in the hundreds of millions of dollars dependent on the facility requirements and size. Previous mission concept studies for constructing a NASA sample receiving facility with an integrated BSL-4 quarantine and biohazard testing facility have also been estimated in the hundreds of millions of dollars. As an alternative option, we have recently conducted an initial trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a faction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in approximately 90% cost reduction when compared to traditional construction methods without compromising the preservation of the sample or Earth.
Texas State Support for School Facilities, 1971 to 2001.
ERIC Educational Resources Information Center
Clark, Catherine
2001-01-01
Reviews 30 years of state efforts to support school-facilities construction and renovation in Texas. Describes recent state programs to provide direct funding for school facilities: Instructional Facilities Allotment, Existing Debt Allotment, and New Instructional Facilities Allotment. Although state funding of school facilities has increased,…
DOT National Transportation Integrated Search
2012-06-01
The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...
DOT National Transportation Integrated Search
1994-01-01
This report examines the phenomenon of the unearned increment, which is the often substantial increase in private land values resulting from transportation facility construction, and possible attempts to recoup it to finance transportation projects. ...
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana
2014-11-01
Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.
Raymond International Inc. will construct twin berthing facilities for loading and offloading crude
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-03-06
Raymond International Inc. will construct twin berthing facilities for loading and offloading crude in St. James Parish, La. The $16.6 million contract was let under the Strategic Petroleum Reserve program. Completion is expected in 1978.
The Advanced Technology Solar Telescope: design and early construction
NASA Astrophysics Data System (ADS)
McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer
2012-09-01
The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.
40 CFR 264.1 - Purpose, scope and applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...
40 CFR 264.1 - Purpose, scope and applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...
40 CFR 264.1 - Purpose, scope and applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...
CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP627) SHOWING EMPLACEMENT OF ...
CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING EMPLACEMENT OF ROOF SLABS. INL PHOTO NUMBER NRTS-54-13463. R.G. Larsen, Photographer, 12/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
New facilities and additions to existing facilities will be required to meet the EPA's new (early 1970s) environmental quality standards. The report examines extent of these additional demands for construction and their economic impacts.
Hanford Spent Nuclear Fuel Project recommended path forward
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fulton, J.C.
The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less
A new gated x-ray detector for the Orion laser facility
NASA Astrophysics Data System (ADS)
Clark, David D.; Aragonez, Robert; Archuleta, Thomas; Fatherley, Valerie; Hsu, Albert; Jorgenson, Justin; Mares, Danielle; Oertel, John; Oades, Kevin; Kemshall, Paul; Thomas, Phillip; Young, Trevor; Pederson, Neal
2012-10-01
Gated X-Ray Detectors (GXD) are considered the work-horse target diagnostic of the laser based inertial confinement fusion (ICF) program. Recently, Los Alamos National Laboratory (LANL) has constructed three new GXDs for the Orion laser facility at the Atomic Weapons Establishment (AWE) in the United Kingdom. What sets these three new instruments apart from what has previously been constructed for the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is: improvements in detector head microwave transmission lines, solid state embedded hard drive and updated control software, and lighter air box design and other incremental mechanical improvements. In this paper we will present the latest GXD design enhancements and sample calibration data taken on the Trident laser facility at Los Alamos National Laboratory using the newly constructed instruments.
75 FR 13340 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...--design and construction. Terminal facility improvements--design and construction. Runway pavement overlay... Collection at CHS and Use at CHS: Upgrade police radio communications. Design flight/baggage information... expansion--design. Standardize airfield signage. Restripe airfield taxiway and ramp edge. Improve airport...
Construction of Rabbit Immune Antibody Libraries.
Nguyen, Thi Thu Ha; Lee, Jong Seo; Shim, Hyunbo
2018-01-01
Rabbits have distinct advantages over mice as a source of target-specific antibodies. They produce higher affinity antibodies than mice, and may elicit strong immune response against antigens or epitopes that are poorly immunogenic or tolerated in mice. However, a great majority of currently available monoclonal antibodies are of murine origin because of the wider availability of murine fusion partner cell lines and well-established tools and protocols for fusion and cloning of mouse hybridoma. Phage-display selection of antibody libraries is an alternative method to hybridoma technology for the generation of target-specific monoclonal antibodies. High-affinity monoclonal antibodies from nonmurine species can readily be obtained by constructing immune antibody libraries from B cells of the immunized animal and screening the library by phage display. In this article, we describe the construction of a rabbit immune Fab library for the facile isolation of rabbit monoclonal antibodies. After immunization, B-cell cDNA is obtained from the spleen of the animal, from which antibody variable domain repertoires are amplified and assembled into a Fab repertoire by PCR. The Fab genes are then cloned into a phagemid vector and transformed to E. coli, from which a phage-displayed immune Fab library is rescued. Such a library can be biopanned against the immunization antigen for rapid identification of high-affinity, target-specific rabbit monoclonal antibodies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1991-04-01
This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less
Design and construction of the X-2 two-stage free piston driven expansion tube
NASA Technical Reports Server (NTRS)
Doolan, Con
1995-01-01
This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.
APSIC Guidelines for environmental cleaning and decontamination.
Ling, Moi Lin; Apisarnthanarak, Anucha; Thu, Le Thi Anh; Villanueva, Victoria; Pandjaitan, Costy; Yusof, Mohamad Yasim
2015-01-01
This document is an executive summary of APSIC Guidelines for Environmental Cleaning and Decontamination. It describes best practices in routine cleaning and decontamination in healthcare facilities as well as in specific settings e.g. management of patients with isolation precautions, food preparation areas, construction and renovation, and following a flood. It recommends the implementation of environmental hygiene program to keep the environment safe for patients, staff and visitors visiting a healthcare facility. Objective assessment of cleanliness and quality is an essential component of this program as a method for identifying quality improvement opportunities. Recommendations for safe handling of linen and bedding; as well as occupational health and safety issues are included in the guidelines. A training program is vital to ensure consistent adherence to best practices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raimondo, E.; Capman, J.L.; Herovard, M.
1985-05-01
Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less
48 CFR 849.106 - Fraud or other criminal conduct.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.106 Fraud or other criminal conduct. (a... following: (i) The DSPE. (ii) The Director, Office of Construction and Facilities Management, in the case of contracting officers from the Office of Construction and Facilities Management. (3) Follow procedures as...
Design and construction of a full-scale lateral impact testing facility.
DOT National Transportation Integrated Search
2015-05-01
The goal of this work is to design and construct a full scale lateral impact testing facility that is capable of recreating the damage that would be created by an overheight vehicle collision. This was accomplished by impacting a test specimen with 8...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2014-10-01 2014-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2011-10-01 2011-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2013-10-01 2013-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
42 CFR 136.110 - Facilities construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2012-10-01 2012-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...
24 CFR 8.22 - New construction-housing facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false New construction-housing facilities. 8.22 Section 8.22 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development NONDISCRIMINATION BASED ON HANDICAP IN FEDERALLY ASSISTED PROGRAMS AND ACTIVITIES OF...
1984-12-01
5 Background Objective Approach Scope of Work Organization 2 SUMMARY OF ENVIRONMENTAL CONDITIONS AT MASIRAH ISLAND ................. 7 Soil ...CONDITIONS AT MASIRAH ISLAND Soil Resistivity Values for the soil resistivity at this location are not readily avail- able. It is, however, considered...to be a very aggressive soil with high amounts of chlorides and sulfates, which can be converted to corrosive sul- -. fides. Soil samples will be
NASA Astrophysics Data System (ADS)
Gu, Jinghe; Li, Qiyun; Zeng, Pan; Meng, Yulin; Zhang, Xiukui; Wu, Ping; Zhou, Yiming
2017-08-01
Micro/nano-architectured transition-metal@C hybrids possess unique structural and compositional features toward lithium storage, and are thus expected to manifest ideal anodic performances in advanced lithium-ion batteries (LIBs). Herein, we propose a facile and scalable solid-state coordination and subsequent pyrolysis route for the formation of a novel type of micro/nano-architectured transition-metal@C hybrid (i.e., Ni@C nanosheet-assembled hierarchical network, Ni@C network). Moreover, this coordination-pyrolysis route has also been applied for the construction of bare carbon network using zinc salts instead of nickel salts as precursors. When applied as potential anodic materials in LIBs, the Ni@C network exhibits Ni-content-dependent electrochemical performances, and the partially-etched Ni@C network manifests markedly enhanced Li-storage performances in terms of specific capacities, cycle life, and rate capability than the pristine Ni@C network and carbon network. The proposed solid-state coordination and pyrolysis strategy would open up new opportunities for constructing micro/nano-architectured transition-metal@C hybrids as advanced anode materials for LIBs.
DOT National Transportation Integrated Search
1996-11-01
The Louisiana Transportation Research Center's (LTRC) Pavement Research Facility (PRF) is a permanent, outdoor, full-scale testing laboratory located on a six site in Port Allen, Louisiana. The purpose of this facility is to test and quantify full-sc...
Production of medical radioactive isotopes using KIPT electron driven subcritical facility.
Talamo, Alberto; Gohar, Yousry
2008-05-01
Kharkov Institute of Physics and Technology (KIPT) of Ukraine in collaboration with Argonne National Laboratory (ANL) has a plan to construct an electron accelerator driven subcritical assembly. One of the facility objectives is the production of medical radioactive isotopes. This paper presents the ANL collaborative work performed for characterizing the facility performance for producing medical radioactive isotopes. First, a preliminary assessment was performed without including the self-shielding effect of the irradiated samples. Then, more detailed investigation was carried out including the self-shielding effect, which defined the sample size and location for producing each medical isotope. In the first part, the reaction rates were calculated as the multiplication of the cross section with the unperturbed neutron flux of the facility. Over fifty isotopes have been considered and all transmutation channels are used including (n, gamma), (n, 2n), (n, p), and (gamma, n). In the second part, the parent isotopes with high reaction rate were explicitly modeled in the calculations. Four irradiation locations were considered in the analyses to study the medical isotope production rate. The results show the self-shielding effect not only reduces the specific activity but it also changes the irradiation location that maximizes the specific activity. The axial and radial distributions of the parent capture rates have been examined to define the irradiation sample size of each parent isotope.
NASA Technical Reports Server (NTRS)
Allton, J. H.; Zeigler, R. A.; Calaway, M. J.
2016-01-01
The Lunar Receiving Laboratory (LRL) was planned and constructed in the 1960s to support the Apollo program in the context of landing on the Moon and safely returning humans. The enduring science return from that effort is a result of careful curation of planetary materials. Technical decisions for the first facility included sample handling environment (vacuum vs inert gas), and instruments for making basic sample assessment, but the most difficult decision, and most visible, was stringent biosafety vs ultra-clean sample handling. Biosafety required handling of samples in negative pressure gloveboxes and rooms for containment and use of sterilizing protocols and animal/plant models for hazard assessment. Ultra-clean sample handling worked best in positive pressure nitrogen environment gloveboxes in positive pressure rooms, using cleanable tools of tightly controlled composition. The requirements for these two objectives were so different, that the solution was to design and build a new facility for specific purpose of preserving the scientific integrity of the samples. The resulting Lunar Curatorial Facility was designed and constructed, from 1972-1979, with advice and oversight by a very active committee comprised of lunar sample scientists. The high precision analyses required for planetary science are enabled by stringent contamination control of trace elements in the materials and protocols of construction (e.g., trace element screening for paint and flooring materials) and the equipment used in sample handling and storage. As other astromaterials, especially small particles and atoms, were added to the collections curated, the technical tension between particulate cleanliness and organic cleanliness was addressed in more detail. Techniques for minimizing particulate contamination in sample handling environments use high efficiency air filtering techniques typically requiring organic sealants which offgas. Protocols for reducing adventitious carbon on sample handling surfaces often generate particles. Further work is needed to achieve both minimal particulate and adventitious carbon contamination. This paper will discuss these facility topics and others in the historical context of nearly 50 years' curation experience for lunar rocks and regolith, meteorites, cosmic dust, comet particles, solar wind atoms, and asteroid particles at Johnson Space Center.
Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blasing, T.J.; Brown, R.A.; Cada, G.F.
1992-02-01
The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production ofmore » medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.« less
ERIC Educational Resources Information Center
King, Johathan; Carter, Donn
1974-01-01
An award-winning facility that is a superior expression of the latest in construction techniques -- techniques that are paring away at wastes in construction time and money, while maintaining structural quality. A related article is EA 504 766 (American School and University; v46 n7 Mar '74.) (Author)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gloudemans, J.R.
1991-08-01
The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integralmore » system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.« less
40 CFR 35.920-3 - Contents of application.
Code of Federal Regulations, 2010 CFR
2010-07-01
... legal description of the property to be acquired, a preliminary layout of the distribution and drainage...) Step 2+3. Combination design and construction of a treatment works. Before the award of a grant or... report (required only if a facility is to be constructed) including facility design data and cost...
40 CFR 35.920-3 - Contents of application.
Code of Federal Regulations, 2011 CFR
2011-07-01
... legal description of the property to be acquired, a preliminary layout of the distribution and drainage...) Step 2+3. Combination design and construction of a treatment works. Before the award of a grant or... report (required only if a facility is to be constructed) including facility design data and cost...
40 CFR 35.920-3 - Contents of application.
Code of Federal Regulations, 2012 CFR
2012-07-01
... legal description of the property to be acquired, a preliminary layout of the distribution and drainage...) Step 2+3. Combination design and construction of a treatment works. Before the award of a grant or... report (required only if a facility is to be constructed) including facility design data and cost...
10 CFR 503.25 - Public interest.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES Temporary Exemptions for New Facilities § 503.25..., during the construction of an alternate-fuel fired unit, the petitioner may substitute, in lieu of the... during the construction of an alternate fuel fired unit to be owned or operated by the petitioner; and (2...
"Getting the College Union Building Project Under Way." A Seminar.
ERIC Educational Resources Information Center
Butts, Porter
In this speech, the author provides some guidelines covering student union construction for those administrators contemplating the construction of such a facility. The recommendations and information presented cover (1) the organization and functions of an official "union planning committee;" (2) a survey of local needs regarding facilities to be…
45 CFR 98.84 - Construction and renovation of child care facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... services, quality activities, or administrative costs). (h) A construction or renovation project that... facilities. 98.84 Section 98.84 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... child care services provided by the Tribal Lead Agency as compared to the level of services provided by...
Construction Grants for Educational Facilities, Fiscal Years 1965-77. Health Manpower References.
ERIC Educational Resources Information Center
Berman, Bella U.; Rosenthal, Samuel
This publication provides information on construction assistance awarded to schools of medicine, osteopathic medicine, dentistry, optometry, pharmacy, podiatric medicine, veterinary medicine, public health, and nursing. In addition it provides data on grants awarded to schools of allied health, medical libraries, and health research facilities.…
76 FR 36526 - Columbia Gas Transmission, LLC; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-22
....47-mile of 20-inch pipeline to transport natural gas for Virginia Power Services Energy Corp., Inc...- fired electric generation facility being constructed by Virginia Electric and Power Company d/b/a... expects to complete the construction and place the electric generation facility in service during 2014...
30 CFR 282.13 - Suspension of production or other operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... reasonable time to develop a mine and construct necessary support facilities, or (2) Allow for the construction or negotiation for use of transportation facilities. (b) The Director may also direct or, at the... consents, including administrative or judicial challenges or appeals; (7) The Director determines that...
Facility Programming and Construction Criteria [Planning Guide]. 702 KAR 4:170.
ERIC Educational Resources Information Center
Kentucky State Dept. of Education, Frankfort. Div. of Facilities Management.
This facility construction planning guide presents the minimum instructional space standards for Kentucky's public school system. It provides definitions of terms found in the regulations; presents space requirements for every type of instructional space within a public school, including circulation areas, storage, and mechanical/electrical areas;…
Hazard and operability study of the multi-function Waste Tank Facility. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, M.E.
1995-05-15
The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, Darius D.; Kraus, Adam R.; Bucknor, Matthew D.
A 1/2 scale test facility has been constructed at Argonne National Laboratory to study the heat removal performance and natural circulation flow patterns in a Reactor Cavity Cooling System (RCCS). Our test facility, the Natural convection Shutdown heat removal Test Facility (NSTF), supports the broader goal of developing an inherently safe and fully passive ex-vessel decay heat removal for advanced reactor designs. The project, initiated in 2010 to support the Advanced Reactor Technologies (ART), Small Modular Reactor (SMR), and Next Generation Nuclear Plant (NGNP) programs, has been conducting experimental operations since early 2014. The following paper provides a summary ofmore » some primary design features of the 26-m tall test facility along with a description of the data acquisition suite that guides our experimental practices. Specifics of the distributed fiber optic temperature measurements will be discussed, which introduces an unparalleled level of data density that has never before been implemented in a large scale natural circulation test facility. Results from our test series will then be presented, which provide insight into the thermal hydraulic behavior at steady-state and transient conditions for varying heat flux levels and exhaust chimney configuration states. (C) 2016 Elsevier B.V. All rights reserved.« less
Airborne oceanographic lidar system
NASA Technical Reports Server (NTRS)
1975-01-01
Specifications and preliminary design of an Airborne Oceanographic Lidar (AOL) system, which is to be constructed for installation and used on a NASA Wallops Flight Center (WFC) C-54 research aircraft, are reported. The AOL system is to provide an airborne facility for use by various government agencies to demonstrate the utility and practicality of hardware of this type in the wide area collection of oceanographic data on an operational basis. System measurement and performance requirements are presented, followed by a description of the conceptual system approach and the considerations attendant to its development. System performance calculations are addressed, and the system specifications and preliminary design are presented and discussed.
48 CFR 252.239-7011 - Special construction and equipment charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... this clause, the Government shall have the right to terminate the service under the Cancellation or...) The Government will not directly reimburse the Contractor for the cost of constructing any facilities... the Contractor stops using facilities or equipment which the Government has, in whole or part...
Construction alternatives for free-standing facilities.
Brown, G
1990-01-01
Many hospitals are exploring free-standing facilities as an option for providing more efficient imaging services. Mr. Brown discusses the pros and cons of an emerging building technology, manufactured construction, in which building and site preparation are done simultaneously. He presents the criteria managers should use to make a knowledgeable decision.
34 CFR 222.19 - What other statutes and regulations apply to this part?
Code of Federal Regulations, 2012 CFR
2012-07-01
... the basis of sex), and the implementing regulations (34 CFR part 106). (Authority: 20 U.S.C. 1681-1683... for federally connected children with disabilities), 8007 (construction), and 8008 (school facilities... children with disabilities), 8007 (construction), and 8008 (school facilities). (4) 34 CFR part 82 (New...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT ...
REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT OF MTR BUILDING, TRA-603. WOOD PLANKS REST ON CANAL WALL OBSERVABLE IN FOREGROUND. INL NEGATIVE NO. 11745. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Construction continues on the RLV complex at the Shuttle Landing Facility
NASA Technical Reports Server (NTRS)
1999-01-01
At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, workers take measurements for one of the buildings. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.
NASA Astrophysics Data System (ADS)
Zhang, Liling; Huang, Da; Hu, Nantao; Yang, Chao; Li, Ming; Wei, Hao; Yang, Zhi; Su, Yanjie; Zhang, Yafei
2017-02-01
A novel three-dimensional (3D) structure of reduced graphene oxide/polyaniline (rGO/PANI) hybrid films has been demonstrated for high-performance supercapacitors. Steamed water in closed vessels with high pressure and moderately high temperature is applied to facilely construct this structure. The as-designed rGO/PANI hybrid films exhibit a highest gravimetric specific capacitance of 1182 F g-1 at 1 A g-1 in the three-electrode test. The assembled symmetric device based on this structure shows both a high capacitance of 808 F g-1 at 1 A g-1 and a high gravimetric energy density (28.06 Wh kg-1 at a power density of 0.25 kW kg-1). Above all, this novel 3D structure constructed by steamed water regulation techniques shows excellent capacitance performance and holds a great promise for high-performance energy storage applications.
Construction continues on the RLV complex at the Shuttle Landing Facility
NASA Technical Reports Server (NTRS)
1999-01-01
At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, a worker takes a measurement. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.
77 FR 24646 - Open Access and Priority Rights on Interconnection Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-25
... multiple generation facilities to transmit power from the generation facility to the integrated... power flows toward the network grid, with no electrical loads between the generation facilities and the... generator expansion plans with milestones for construction of generation facilities and can demonstrate that...
Development of a high specific 1.5 to 5 kW thermal arcjet
NASA Technical Reports Server (NTRS)
Riehle, M.; Glocker, B.; Auweter-Kurtz, M.; Kurtz, H.
1993-01-01
A research and development project on the experimental study of a 1.5-5 kW thermal arcjet thruster was started in 1992 at the IRS. Two radiation cooled thrusters were designed, constructed, and adapted to the test facilities, one at each end of the intended power range. These thrusters are currently subjected to an intensive test program with main emphasis on the exploration of thruster performance and thruster behavior at high specific enthalpy and thus high specific impulse. Propelled by simulated hydrazine and ammonia, the thruster's electrode configuration such as constrictor diameter and cathode gap was varied in order to investigate their influence and to optimize these parameters. In addition, test runs with pure hydrogen were performed for both thrusters.
Ezzell, Gary A.
2004-01-01
We have recently commissioned a temporary radiation therapy facility that is novel in two aspects: it was constructed using modular components, and the LINAC was installed in one of the modular sections before it was lifted into position. Additional steel and granular fill was added to the modular sections on‐site during construction. The building will be disassembled and removed when no longer needed. This paper describes the radiation shielding specifications and survey of the facility, as well as the ramifications for acceptance testing occasioned by the novel installation procedure. The LINAC is a Varian 21EX operating at 6 MV and 18 MV. The radiation levels outside the vault satisfied the design criteria, and no anomalous leakage was detected along the joints of the modular structure. At 18 MV and 600 monitor units (MU) per minute, the radiation level outside the primary barrier walls was 8.5μSv/h of photons; there were no detectable neutrons. Outside the direct‐shielded door, the levels were 0.4μSv/h of photons and 3.0μSv/h of neutrons. The isocentricity of the accelerator met the acceptance criteria and was not affected by its preinstallation into an integrated baseframe and subsequent transport to the building site. PACS numbers: 87.52.Df, 87.52.Ga PMID:15738926
National Biomedical Tracer Facility: Project definition study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heaton, R.; Peterson, E.; Smith, P.
The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPFmore » to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.« less
Asakura, Hiroshi; Matsuto, Toshihiko; Inoue, Yuzo
2010-08-01
In Japan, as the construction of new landfill facilities has become extremely difficult and the number of sites procured for landfill construction has decreased due to the 'not in my back yard' (NIMBY) syndrome, it has been assumed that the adoption of new technologies has increased. As the performance of new technologies exceeds that of conventional technologies, it is also assumed that residents would prefer the use of these new technologies and therefore any construction plans should be devised to ensure their use to ensure residents' satisfaction. In the present study, the technologies adopted for municipal solid waste landfill facilities constructed in recent years (2000 to 2004) in Japan and the bases for their adoption were investigated by means of a questionnaire survey. One of the main bases for the adoption of new technologies was the request by residents for new technology for roofing, rather than the other for new technologies for barrier systems, leachate treatment, and monitoring. In addition, it is possible that the municipalities did not recognize the difference between conventional and new technologies as defined in this study. The roof-type landfill that isolates waste from the surrounding environment was one of the requirements for the construction of new landfill facilities identified in the present investigation, and in this regard waste isolation should be required in all circumstances.
Construction Management--Exploding Some Myths.
ERIC Educational Resources Information Center
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... and parking apron improvements; construction of additional bachelor enlisted quarters (BEQs... MCB Hawaii Kaneohe Bay, types of basing facilities that are required, improvements at training areas... construction, replacement, and renovation of facilities at MCB Hawaii Kaneohe Bay, and include improvements to...
ERIC Educational Resources Information Center
Bair, Howard V.; Leland, Henry
To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... buildings (Buildings 2, 4, 6, 7, and 8) and construction of a single 5-story replacement facility in the... clinics; incorporate evidence-based design; include expansion of technology; and allow for operational... regulation. 2. MFD--demolition of five hospital buildings, construction of a single 5-story replacement...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
Orbital construction demonstration study. Volume 3: Requirements document
NASA Technical Reports Server (NTRS)
1977-01-01
A comprehensive set of requirements that defines the objective, scope and configuration of the orbital test facility needed to demonstrate the necessary automated fabrication, construction and assembly technology is provided. In addition to the requirements for the orbital demonstration facility, a detailed list of experiment requirements is included for various areas of technology.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...
Environmental Projects. Volume 9: Construction of hazardous materials storage facilities
NASA Technical Reports Server (NTRS)
1989-01-01
Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.
76 FR 2617 - No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs 25 CFR Chapter I No Child Left Behind School... Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction Negotiated... Affairs and Collaborative Action, Office of the Assistant Secretary--Indian Affairs, 1001 Indian School...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...
1986-10-01
organizations for facility support of bulk petrole - um products if necessary. Military construction of petroleum storage terminals is a joint responsibili...and MSC in arranging for domestic transport of petrole - um products. These two TOAs have specific responsibilities, depending on the type of vehicle...Military Liaison Office, Kuwait U.S. Liaison Office, Tunisia U.S. Mutual Defense Assistance Office U.S. Military Group U.S. Military Liaison Office U.S
Commercial-scale biotherapeutics manufacturing facility for plant-made pharmaceuticals.
Holtz, Barry R; Berquist, Brian R; Bennett, Lindsay D; Kommineni, Vally J M; Munigunti, Ranjith K; White, Earl L; Wilkerson, Don C; Wong, Kah-Yat I; Ly, Lan H; Marcel, Sylvain
2015-10-01
Rapid, large-scale manufacture of medical countermeasures can be uniquely met by the plant-made-pharmaceutical platform technology. As a participant in the Defense Advanced Research Projects Agency (DARPA) Blue Angel project, the Caliber Biotherapeutics facility was designed, constructed, commissioned and released a therapeutic target (H1N1 influenza subunit vaccine) in <18 months from groundbreaking. As of 2015, this facility was one of the world's largest plant-based manufacturing facilities, with the capacity to process over 3500 kg of plant biomass per week in an automated multilevel growing environment using proprietary LED lighting. The facility can commission additional plant grow rooms that are already built to double this capacity. In addition to the commercial-scale manufacturing facility, a pilot production facility was designed based on the large-scale manufacturing specifications as a way to integrate product development and technology transfer. The primary research, development and manufacturing system employs vacuum-infiltrated Nicotiana benthamiana plants grown in a fully contained, hydroponic system for transient expression of recombinant proteins. This expression platform has been linked to a downstream process system, analytical characterization, and assessment of biological activity. This integrated approach has demonstrated rapid, high-quality production of therapeutic monoclonal antibody targets, including a panel of rituximab biosimilar/biobetter molecules and antiviral antibodies against influenza and dengue fever. © 2015 Society for Experimental Biology, Association of Applied Biologists and John Wiley & Sons Ltd.
A Center for Extraterrestrial Engineering and Construction (CETEC)
NASA Technical Reports Server (NTRS)
Leigh, Gerald G.
1992-01-01
A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.
Tribal Child Care Facilities: A Guide to Construction and Renovation
ERIC Educational Resources Information Center
US Department of Health and Human Services, 2006
2006-01-01
The Personal Responsibility and Work Opportunity Reconciliation Act of 1996 allowed Tribes to use Child Care and Development Fund (CCDF) monies for the construction or renovation of child care facilities. As procedures have been implemented over the years, Tribes and Administration for Children and Families (ACF) Regional Offices have identified a…
75 FR 29420 - Revision of LNG and LHG Waterfront Facility General Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-26
... exclusive authority to approve or deny an application for the siting, construction, expansion, or operation... a Follow-on WSA will be submitted to the U.S. Coast Guard no later than the filing of an application... least 180 days before the applicant files an application for authorization to construct the facility...
Financing Educational Facility Construction: Prevailing Wage Litigation.
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
This chapter presents an up-to-date analysis of prevailing state wage laws that affect educational facility construction or renovation and highlights relevant prevailing wage litigation in many states. Currently, 13 states have no prevailing wage laws for public works. The other 37 states and the District of Columbia do have prevailing wage laws…
40 CFR 35.935-17 - Training facility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...
40 CFR 35.935-17 - Training facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...
Promoting the Construction of an Optimal Nurse's Office Facility: One School District's Experience.
ERIC Educational Resources Information Center
McKibben, Cynthia; DiPaolo, Sonja J.
1997-01-01
Details recommendations for updating or constructing nurses' offices based upon a descriptive study done in one midwestern school district. Suggestions are provided on size, location, and equipment needed. Also addressed is the communication process needed to persuade a board of education and school administrators that nursing facilities must be a…
1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING ...
1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING 771 WAS ONE OF THE FIRST FOUR MAJOR BUILDINGS AT THE ROCKY FLATS PLANT, BUILDING 771 WAS ORIGINALLY THE PRIMARY FACILITY FOR PLUTONIUM OPERATIONS. (5/29/52) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO
Code of Federal Regulations, 2013 CFR
2013-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
January 20, 2012. This EPA's OIG is initiating a review from an OIG hotline complaint regarding whether federal funds were properly used to construct the new Spokane County wastewater treatment facility in accordance with 40 CFR 35, Subpart K.
A requirements specification for a software design support system
NASA Technical Reports Server (NTRS)
Noonan, Robert E.
1988-01-01
Most existing software design systems (SDSS) support the use of only a single design methodology. A good SDSS should support a wide variety of design methods and languages including structured design, object-oriented design, and finite state machines. It might seem that a multiparadigm SDSS would be expensive in both time and money to construct. However, it is proposed that instead an extensible SDSS that directly implements only minimal database and graphical facilities be constructed. In particular, it should not directly implement tools to faciliate language definition and analysis. It is believed that such a system could be rapidly developed and put into limited production use, with the experience gained used to refine and evolve the systems over time.
2012-09-20
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, groundbreaking will begin for the construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser
Construction continues on the RLV complex at the Shuttle Landing Facility
NASA Technical Reports Server (NTRS)
1999-01-01
Construction is under way for the X-33/X-34 hangar complex near the Shuttle Landing Facility at KSC. The Reusable Launch Vehicle (RLV) complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
... to obtain oral and written comments concerning a draft report to provide Congress and the Secretary... equitable distribution of funds to address those needs. The reports are to be submitted to Congress and to... Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee--Draft Report...
2004-09-01
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility finish Hurricane preparations on the payload bay doors of Atlantis. Preparing for the expected impact of Hurricane Frances on Saturday, workers also powered down the Space Shuttle orbiters, and stowed the landing gear. They are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility cover up areas of Atlantis with plastic, preparing for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, closing the payload bay doors and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility cover up areas of Atlantis, preparing for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, closing the payload bay doors and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, a worker checks out part of Atlantis after payload bay doors were closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility cover up areas of Atlantis with plastic, preparing for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, closing the payload bay doors and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, workers prepare to close the payload bay doors on Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to stow the landing gear on the orbiter Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, and closing their payload bay doors. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare the wheel bay to stow Atlantis’ landing gear in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, and closing their payload bay doors. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to close the nose wheel doors on Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Preparations at KSC include powering down the Space Shuttle orbiters, closing their payload bay doors and stowing their landing gear. They are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare the orbiter Atlantis and related equipment for the expected impact of Hurricane Frances on Saturday. Preparations at KSC include powering down the Space Shuttle orbiters, closing their payload bay doors and stowing their landing gear. They are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, the payload bay doors on Atlantis are being closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to stow the landing gear on the orbiter Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, and closing their payload bay doors. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Atlantis’ payload bay doors are being closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, workers prepare to close the payload bay doors on Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to close the nose wheel doors on Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Preparations at KSC include powering down the Space Shuttle orbiters, closing their payload bay doors and stowing their landing gear. They are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility prepare to close the nose wheel doors on Atlantis in preparation for the expected impact of Hurricane Frances on Saturday. Preparations at KSC include powering down the Space Shuttle orbiters, closing their payload bay doors and stowing their landing gear. They are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, the payload bay doors on Atlantis are being closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, the payload bay doors on Atlantis are being closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Atlantis’ wheels are raised into their wheel bays in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, and closing their payload bay doors. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-09-01
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, the payload bay doors on Atlantis are being closed in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
2004-08-31
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Atlantis’ wheels are raised into their wheel bays in preparation for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, and closing their payload bay doors. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
Design, construction and operation features of high-rise structures
NASA Astrophysics Data System (ADS)
Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga
2018-03-01
The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.
This photographic copy of an engineering drawing shows floor plans, ...
This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.
CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less
Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities
NASA Technical Reports Server (NTRS)
1987-01-01
The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.
Perimeter security for Minnesota correctional facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crist, D.; Spencer, D.D.
1996-12-31
For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less
The Americans with Disabilities Act: prescription for tax relief.
Cook, E D; Judice, A K; Hazelwood, A C
1996-01-01
As employers, healthcare organizations must comply with Title I of the Americans with Disabilities Act of 1990-Employment Discrimination by Private Entities-which covers virtually all aspects of employment and prohibits employers from discriminating against otherwise qualified job applicants and workers who have disabilities or who become disabled. Further, healthcare organizations must comply with the provisions of Title III of the act-Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities-which requires places of public accommodations and commercial facilities to be designed, constructed, and altered in compliance with the accessibility standards of the act. While compliance with the ADA can be costly, four specific sections of the Internal Revenue Code offer tax relief to organizations that meet the guidelines of Titles I and III.
Construction of the Propulsion Systems Laboratory No. 1 and 2
1951-01-21
Construction of the Propulsion Systems Laboratory No. 1 and 2 at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. When it began operation in late 1952, the Propulsion Systems Laboratory was the NACA’s most powerful facility for testing full-scale engines at simulated flight altitudes. The facility contained two altitude simulating test chambers which were a technological combination of the static sea-level test stands and the complex Altitude Wind Tunnel, which recreated actual flight conditions on a larger scale. NACA Lewis began designing the new facility in 1947 as part of a comprehensive plan to improve the altitude testing capabilities across the lab. The exhaust, refrigeration, and combustion air systems from all the major test facilities were linked. In this way, different facilities could be used to complement the capabilities of one another. Propulsion Systems Laboratory construction began in late summer 1949 with the installation of an overhead exhaust pipe connecting the facility to the Altitude Wind Tunnel and Engine Research Building. The large test section pieces arriving in early 1951, when this photograph was taken. The two primary coolers for the altitude exhaust are in place within the framework near the center of the photograph.
NASA Technical Reports Server (NTRS)
Grey, J.
1977-01-01
Reports submitted to the conference encompass: administration and law relating to inhabited space facilities and colonies; space manufacturing and processing; organization and construction of space habitats and management of space colony farms; winning and acquisition of lunar and asteroidal materials for sustaining autonomous space colonies. Attention is given to trajectories between earth, low earth orbit, earth-moon libration points (specifically L5), circumlunar parking orbits, and trajectories in translunar space; effects of low gravity and zero gravity on human physiology and on materials processing; architecture and landscaping for space colonies; closed ecosystems of space colonies. Varieties of human cultures and value hierarchies around the earth are examined for broader perspectives on the social organization of space colonies.
Advanced Hypervelocity Aerophysics Facility Workshop
NASA Technical Reports Server (NTRS)
Witcofski, Robert D. (Compiler); Scallion, William I. (Compiler)
1989-01-01
The primary objective of the workshop was to obtain a critical assessment of a concept for a large, advanced hypervelocity ballistic range test facility powered by an electromagnetic launcher, which was proposed by the Langley Research Center. It was concluded that the subject large-scale facility was feasible and would provide the required ground-based capability for performing tests at entry flight conditions (velocity and density) on large, complex, instrumented models. It was also concluded that advances in remote measurement techniques and particularly onboard model instrumentation, light-weight model construction techniques, and model electromagnetic launcher (EML) systems must be made before any commitment for the construction of such a facility can be made.
Bakhshoodeh, Reza; Alavi, Nadali; Paydary, Pooya
2017-10-01
Handling and treatment of composting leachate is difficult and poses major burdens on composting facilities. The main goal of this study was to evaluate usage of a three-stage, constructed wetland to treat leachate produced in Isfahan composting facility. A pilot-scale, three-stage, subsurface, horizontal flow constructed wetland, planted with vetiver with a flow rate of 24 L/day and a 15-day hydraulic retention time, was used. Removal of organic matter, ammonia, nitrate, total nitrogen, suspended solids, and several heavy metals from Isfahan composting facility leachate was monitored over a 3-month period. Constructed wetland system was capable of efficiently removing BOD 5 (87.3%), COD (74.5%), ammonia (91.5%), nitrate (87.9%), total nitrogen (87.8%), total suspended solids (85.5%), and heavy metals (ranging from 70 to 90%) from the composting leachate. High contaminant removal efficiencies were achieved, but effluent still failed to meet Iranian standards for treated wastewater. This study shows that although a three-stage horizontal flow constructed wetland planted with vetiver cannot be used alone to treat Isfahan composting facility leachate, but it has the potential to be used as a leachate pre-treatment step, along with another complementary method.
State Requirements for Educational Facilities, 1997.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
This document updates Florida's deregulation of construction of educational facilities guidelines, while keeping as the primary focus the safety of the students in pre-K through community college facilities. Organized by the sequence of steps required in the facilities procurement process, it covers general definitions, property…
Code of Federal Regulations, 2010 CFR
2010-07-01
... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651... facilities on my limited lease or any facilities on my project easement proposed under my GAP? If you are...
Locations and attributes of wind turbines in Colorado, 2009
Carr, Natasha B.; Diffendorfer, Jay E.; Fancher, Tammy S.; Latysh, Natalie E.; Leib, Kenneth J.; Matherne, Anne-Marie; Turner, Christine
2011-01-01
The Colorado wind-turbine data series provides geospatial data for all wind turbines established within the State as of August 2009. Attributes specific to each turbine include: turbine location, manufacturer and model, rotor diameter, hub height, rotor height, potential megawatt output, land ownership, and county. Wind energy facility data for each turbine include: facility name, facility power capacity, number of turbines associated with each facility to date, facility developer, facility ownership, year the facility went online, and development status of wind facility. Turbine locations were derived from August 2009 1-meter true-color aerial photographs produced by the National Agriculture Imagery Program; the photographs have a positional accuracy of about + or - 5 meters. The location of turbines under construction during August 2009 likely will be less accurate than the location of existing turbines. This data series contributes to an Online Interactive Energy Atlas currently (2011) in development by the U.S. Geological Survey. The Energy Atlas will synthesize data on existing and potential energy development in Colorado and New Mexico and will include additional natural resource data layers. This information may be used by decisionmakers to evaluate and compare the potential benefits and tradeoffs associated with different energy development strategies or scenarios. Interactive maps, downloadable data layers, comprehensive metadata, and decision-support tools will be included in the Energy Atlas. The format of the Energy Atlas will facilitate the integration of information about energy with key terrestrial and aquatic resources for evaluating resource values and minimizing risks from energy development.
Locations and attributes of wind turbines in New Mexico, 2009
Carr, Natasha B.; Diffendorfer, Jay E.; Fancher, Tammy S.; Latysh, Natalie E.; Leib, Kenneth J.; Matherne, Anne-Marie; Turner, Christine
2011-01-01
The New Mexico wind-turbine data series provides geospatial data for all wind turbines established within the State as of August 2009. Attributes specific to each turbine include: turbine location, manufacturer and model, rotor diameter, hub height, rotor height, potential megawatt output, land ownership, and county. Wind energy facility data for each turbine include: facility name, facility power capacity, number of turbines associated with each facility to date, facility developer, facility ownership, year the facility went online, and development status of wind facility. Turbine locations were derived from 1-meter August 2009 true-color aerial photographs produced by the National Agriculture Imagery Program; the photographs have a positional accuracy of about + or - 5 meters. The location of turbines under construction during August 2009 likely will be less accurate than the location of existing turbines. This data series contributes to an Online Interactive Energy Atlas currently (2011) in development by the U.S. Geological Survey. The Energy Atlas will synthesize data on existing and potential energy development in Colorado and New Mexico and will include additional natural resource data layers. This information may be used by decisionmakers to evaluate and compare the potential benefits and tradeoffs associated with different energy development strategies or scenarios. Interactive maps, downloadable data layers, comprehensive metadata, and decision-support tools will be included in the Energy Atlas. The format of the Energy Atlas will facilitate the integration of information about energy with key terrestrial and aquatic resources for evaluating resource values and minimizing risks from energy development.
42 CFR 124.516 - Charitable facility compliance alternative.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Charitable facility compliance alternative. 124.516... RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Reasonable Volume of Uncompensated Services to Persons Unable To Pay § 124.516 Charitable facility compliance alternative. (a) Effect of...
Florida Educational Facilities, 1996.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1996. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…
Florida Educational Facilities, 1997.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1997. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…
Florida Educational Facilities, 1998.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1998. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…
Revenue Bond Financing Auxiliary Service Facilities Construction at the State Colleges.
ERIC Educational Resources Information Center
Maryland Board of Trustees of the State Colleges, Baltimore.
Since the State of Maryland does not provide funds for the construction of dormitories, dining halls, student activities, buildings, and similar ancillary services, an outline of cost responsibilities for such facilities in the state college system is presented. Based on a discussion of the financing methods for ancillary projects, the role of the…
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
Code of Federal Regulations, 2010 CFR
2010-01-01
... CURRENCY, DEPARTMENT OF THE TREASURY INVESTMENT SECURITIES Interpretations § 1.130 Type II securities... financing the construction or improvement of facilities at or used by a university or a degree-granting... construction or improvement of facilities used by a hospital may be eligible as a Type II security, if the...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs 25 CFR Chapter I No Child Left Behind School... Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee will hold its sixth meeting in Albuquerque, New Mexico. The purpose of the meeting is to...
Progress report of the innovated KIST ion beam facility
NASA Astrophysics Data System (ADS)
Kim, Joonkon; Eliades, John A.; Yu, Byung-Yong; Lim, Weon Cheol; Chae, Keun Hwa; Song, Jonghan
2017-01-01
The Korea Institute of Science and Technology (KIST, Seoul, Republic of (S.) Korea) ion beam facility consists of three electrostatic accelerators: a 400 kV single ended ion implanter, a 2 MV tandem accelerator system and a 6 MV tandem accelerator system. The 400 kV and 6 MV systems were purchased from High Voltage Engineering Europa (HVEE, Netherlands) and commissioned in 2013, while the 2 MV system was purchased from National Electrostatics Corporation (NEC, USA) in 1995. These systems are used to provide traditional ion beam analysis (IBA), isotope ratio analysis (ex. accelerator mass spectrometry, AMS), and ion implantation/irradiation for domestic industrial and academic users. The main facility is the 6 MV HVEE Tandetron system that has an AMS line currently used for 10Be, 14C, 26Al, 36 Cl, 41Ca and 129I analyses, and three lines for IBA that are under construction. Here, these systems are introduced with their specifications and initial performance results.
Blue Origin Facility - Construction Progress
2017-03-21
Construction is progressing on Blue Origin's 750,000-square-foot facility being built at Exploration Park on NASA Kennedy Space Center property in Florida. Blue Origin will use the factory to manufacture its two-stage super-heavy-lift New Glenn launch vehicle and launch the vehicles from Space Launch Complex 46 at Cape Canaveral Air Force Station.
ERIC Educational Resources Information Center
Roy, Ken
2010-01-01
If your lab facilities are going to be replaced or renovated, you should insist that the science instructors be involved in the process from planning to construction. You know what you'll need in a facility, and your input should be sought out by administrators and architects alike. Once construction is complete, changes can be very costly, so…
2011-01-20
CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett
2011-01-20
CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geynisman, M.; Bremer, J.; Chalifour, M.
The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ~260 tons) and SBN’s Far Detector (SBN-FD, ~760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements formore » the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution presents specific design requirements and typical implementation solutions for each sub-system of the SBND and SBN-FD cryogenic systems.« less
NASA Astrophysics Data System (ADS)
Geynisman, M.; Bremer, J.; Chalifour, M.; Delaney, M.; Dinnon, M.; Doubnik, R.; Hentschel, S.; Kim, M. J.; Montanari, C.; Montanari, D.; Nichols, T.; Norris, B.; Sarychev, M.; Schwartz, F.; Tillman, J.; Zuckerbrot, M.
2017-12-01
The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ∼260 tons) and SBN’s Far Detector (SBN-FD, ∼760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements for the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution presents specific design requirements and typical implementation solutions for each sub-system of the SBND and SBN-FD cryogenic systems.
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
48 CFR 836.603 - Collecting data on and appraising firms qualifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...
42 CFR 124.517 - Unrestricted availability compliance alternative for Title VI-assisted facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for Title VI-assisted facilities. 124.517 Section 124.517 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND... availability compliance alternative for Title VI-assisted facilities. (a) Effect of certification. The...
42 CFR 493.1101 - Standard: Facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Facilities. 493.1101 Section 493.1101... (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS Facility Administration for Nonwaived Testing § 493.1101 Standard: Facilities. (a) The laboratory must be constructed, arranged, and maintained to...
29 CFR 1926.957 - Construction in energized substations.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1...
29 CFR 1926.957 - Construction in energized substations.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1...
29 CFR 1926.957 - Construction in energized substations.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1...
46 CFR 108.237 - Fuel storage facilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.237 Fuel storage facilities. (a) Helicopter fuel storage tanks must be installed as far as practicable from— (1) The landing area; and (2...
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
45 CFR 1232.15 - New construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...
The Northern Manitoba Mining Academy
NASA Astrophysics Data System (ADS)
Alexandre, Paul
2017-04-01
The Northern Manitoba Mining Academy (NMMA, miningacademy.ca) is a new educational institution located in Flin Flon, Manitoba. It is associated with the University College of the North and is specifically intended to serve the needs of the Northern Manitoban communities with regards to job creation by providing training in a variety of mining, construction, and exploration related areas. NMMA's mission is to provide innovative and responsible solutions for the creation of a knowledgeable, skilled, and sustainable workforce within a vibrant, mineral-rich resource industry. It facilitates strategic training initiatives and research activities in order to strengthen the social, economic, and environmental benefits of a robust mining and resources sector. In terms of education, NMMA offers its own programs, mostly short courses in health and safety, courses organized by the University College of the North (wilderness safety, prospecting, and exploration), and courses organized in association with provincial Industries-Based Safety Programs and Associations (a variety of construction-related trades). However, the programming is not limited to those courses already on the syllabus: the Academy operates on open-doors policy and welcomes people with their unique and diverse needs; it prides itself in its ability to tailor or create specific on-demand courses and deliver them locally in the North. The Northern Manitoba Mining Academy also provides access to its world-class facilities for field-based undergraduate courses, as well as graduate students and researchers doing field work. Full sample preparation facilities are offered to students and scientists in all natural and environmental sciences.
2004-09-01
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility unwrap plastic for use in covering equipment as part of preparations for the expected impact of Hurricane Frances on Saturday. Other preparations at KSC include powering down the Space Shuttle orbiters, closing the payload bay doors and stowing the landing gear. Workers are also taking precautions against flooding by moving spacecraft hardware off the ground and sandbagging facilities. The Orbiter Processing Facility is constructed of concrete and steel and was designed to withstand winds of 105 mph. The Vehicle Assembly Building is constructed of concrete and steel and was designed to withstand winds of 125 mph. Other payload and flight hardware support facilities can endure winds of 110 mph. Launch pads and the Payload Hazardous Servicing Facility can withstand 125-mph winds.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651 Section 285.651 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER...
27 CFR 22.92 - Storage facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Storage facilities. 22.92... Storage facilities. (a) Storerooms or compartments shall be so constructed and secured as to prevent unauthorized access and will be equipped for locking. These storage facilities shall be of sufficient capacity...
27 CFR 22.92 - Storage facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2014-04-01 2014-04-01 false Storage facilities. 22.92... Storage facilities. (a) Storerooms or compartments shall be so constructed and secured as to prevent unauthorized access and will be equipped for locking. These storage facilities shall be of sufficient capacity...
27 CFR 22.92 - Storage facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Storage facilities. 22.92... Storage facilities. (a) Storerooms or compartments shall be so constructed and secured as to prevent unauthorized access and will be equipped for locking. These storage facilities shall be of sufficient capacity...