Sample records for construction permit issued

  1. EPA's Draft 2017 Construction General Permit (CGP)

    EPA Pesticide Factsheets

    EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.

  2. 76 FR 40725 - Approval of Outer Continental Shelf (OCS) Permit Issued to Cape Wind Associates, LLC (EPA Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...

  3. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  4. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  5. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  6. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  7. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  8. 77 FR 27054 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Offshore, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...

  9. 76 FR 55799 - Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to Avenal Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...

  10. 75 FR 82246 - Action To Ensure Authority To Issue Permits Under the Prevention of Significant Deterioration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Deterioration (PSD) program to sources of greenhouse gases (GHGs). This action will ensure that a permitting authority--EPA--is available in these states as of January 2, 2011, when PSD becomes applicable to GHG-emitting sources, to issue preconstruction PSD permits and thereby facilitate construction or expansion...

  11. 77 FR 64237 - Notice of Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...

  12. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  13. 40 CFR 71.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...

  14. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  15. 47 CFR 74.112 - Supplementary statement with application for construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction permit for any experimental broadcast station confirming the applicant's understanding: (a) That... notice or hearing. (e) That any authorization issued pursuant to the application may be cancelled at any time without notice or hearing, and will expire as a matter of law if the station fails to transmit...

  16. An examination of the Virginia Department of Transportation's 404 general permit program.

    DOT National Transportation Integrated Search

    1988-01-01

    Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. A...

  17. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  18. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  19. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  20. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  1. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  2. 40 CFR 52.681 - Permits to construct and tier II operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...

  3. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  4. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  5. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  6. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  7. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  8. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  9. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  10. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  11. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  12. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  13. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  14. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  15. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  16. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...

  17. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  18. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  19. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  20. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  1. Construction Activities Prior to Issuance of a PSD Permit with Respect to Begin Actual Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  2. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  3. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  4. Army Response Letter - signed April 27, 1988

    EPA Pesticide Factsheets

    Army response letter regarding a request to elevate the decision of the New England Division Engineer (DE) to issue a permit to the Maine Department of Transportation to construct a marine terminal at Sears Island.

  5. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance and docketing of application for early review... Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2...

  6. 43 CFR 6305.30 - What are the steps BLM must take in issuing an access authorization to valid occupancies?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... issuing an access authorization to mining claims or other valid occupancies wholly surrounded by... permit the reasonable use of the non-Federal land, valid mining claim, or other valid occupancy; and (3) The location, construction, maintenance, and use of the access route that BLM approves will be as...

  7. 43 CFR 6305.30 - What are the steps BLM must take in issuing an access authorization to valid occupancies?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... issuing an access authorization to mining claims or other valid occupancies wholly surrounded by... permit the reasonable use of the non-Federal land, valid mining claim, or other valid occupancy; and (3) The location, construction, maintenance, and use of the access route that BLM approves will be as...

  8. 43 CFR 6305.30 - What are the steps BLM must take in issuing an access authorization to valid occupancies?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... issuing an access authorization to mining claims or other valid occupancies wholly surrounded by... permit the reasonable use of the non-Federal land, valid mining claim, or other valid occupancy; and (3) The location, construction, maintenance, and use of the access route that BLM approves will be as...

  9. 43 CFR 6305.30 - What are the steps BLM must take in issuing an access authorization to valid occupancies?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... issuing an access authorization to mining claims or other valid occupancies wholly surrounded by... permit the reasonable use of the non-Federal land, valid mining claim, or other valid occupancy; and (3) The location, construction, maintenance, and use of the access route that BLM approves will be as...

  10. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  11. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  12. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  13. Palmdale Energy Project; Final Decision; Prevention of Significant Deterioration (PSD) Permit

    EPA Pesticide Factsheets

    EPA Region 9 is issuing a final decision to grant conditional approval, in accordance with the Clean Air Act, for the construction of a natural gas-fired combined cycle power plant known as the Palmdale Energy Project.

  14. Elevation Request Letter to Army - signed April 29, 1986

    EPA Pesticide Factsheets

    A letter requesting a review of the decision to issue a permit to the Maine Department of Transportation (MEDOT) authorizing the construction of an access causeway and a marine cargo terminal in Penobscot Bay at Sears Island, Searsport, Maine.

  15. December 30, 2003 Petition Requesting the Administrator Object to Chemical Lime Company's and Granite Construction Company's Apex Facility's Title V Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  17. 29 CFR 1926.301 - Hand tools.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Tools-Hand and Power § 1926.301 Hand tools. (a) Employers shall not issue or permit the use of unsafe hand tools. (b) Wrenches, including adjustable, pipe, end...

  18. Letter from Army to EPA accepting elevation - signed June 27, 1994

    EPA Pesticide Factsheets

    A letter in response to the request to review issues related to a Department of the Army permit that would allow Mr. Mike Cusack to construct a residential development within 15 acres of wetlands associated with Ktatt Bog in Anchorage, Alaska.

  19. Source Construction Prior to Issuance of PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Permitting Multi-Phase Construction Under PSD Regulations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  2. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  3. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  4. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  5. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  6. 10 CFR 50.109 - Backfitting.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Backfitting. 50.109 Section 50.109 Energy NUCLEAR... of this chapter; (vi) The date of issuance of the first construction permit issued for a duplicate... paragraph (a)(3) of this section, the Commission will consider how the backfit should be scheduled in light...

  7. Applicability of PSD to Portions of a Plant Constructed in Phases Without Permits

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Clarification Concerning the Scope of Construction-Related Activities that may Occur prior to Issuance of a PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Environmental Assessment for the Proposed Construction and Operation of an Outdoor Recreation Equipment Rental Facility at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2004-10-01

    permit was originally issued on 28 August 1997, most recently reissued as of 01 July 2002, and expires 30 June 2007 (BAFB 2001). In July 2002, the...the months during winter, spring, and fall to 9.8 million gallons for the summer months, such as July . In the first quarter of FY 04, BAFB diverted...PS Form 3811, July 1999 Domestic Return Receipt UNITED STATES POSTAL SERVICE 102595-99-M-1 First-Class Mail Postage & Fees Paid USPS Permit No

  10. Interpretation of Constructed as it Applies to Activities Undertaken Prior to Issuance of a PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Guidance Determining Applicability of New Major Source Regulations in the Granting of Construction Permits to Sources of Air Emissions

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  13. 76 FR 2294 - Revision to the South Coast Portion of the California State Implementation Plan, CPV Sentinel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... precursors, sulfur oxides (SO X ), to the CPV Sentinel Energy Project. The District's SIP approved NSR... Management District shall transfer sulfur oxides and particulate emission credits from the CPV Sentinel... needed to issue permits to construct and to meet requirements for sulfur oxides and particulate matter...

  14. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Definitions. 100.3 Section 100.3 Energy NUCLEAR REGULATORY... means a combined construction permit and operating license with conditions for a nuclear power facility..., issued pursuant to subpart A of part 52 of this chapter, for a site or sites for one or more nuclear...

  15. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  16. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  17. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  18. 76 FR 80366 - Availability of an Environmental Assessment (EA) and Finding of No Significant Impact (FONSI)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...

  19. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2... processing, the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor...

  20. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  1. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  2. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  3. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Earthquake Engineering Criteria for Nuclear Power Plants S... FACILITIES Pt. 50, App. S Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants... applicant or holder whose construction permit was issued before January 10, 1997, the earthquake engineering...

  4. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  5. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... (NPDES) general permits for stormwater discharges associated with construction activity in order to... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  6. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...

  7. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  8. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  9. 76 FR 60830 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...

  10. 78 FR 72081 - Closed Auction of AM Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...

  11. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  12. 76 FR 13363 - Intent To Prepare an Environmental Impact Statement for the Port of Gulfport Expansion Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... application filed on March 17, 2010, proposed filling approximately 700 acres of open-water benthic habitat... filling of up to 400 acres of open-water bottom in the Mississippi Sound, the construction of wharfs... the USACE in deciding whether to issue a Department of the Army permit. The purpose of this Notice of...

  13. 76 FR 19975 - Proposed Information Collection; Comment Request; Survey of Building and Zoning Permit Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... local building permit officials needed for updating the universe of permit-issuing places. The questions... issued. The universe of permit-issuing places is the sampling frame for the Building Permits Survey (BPS...

  14. The other side of the broken window: a methodology that translates building permits into an ecometric of investment by community members.

    PubMed

    O'Brien, Daniel Tumminelli; Montgomery, Barrett W

    2015-03-01

    Much research has focused on physical disorder in urban neighborhoods as evidence that the community does not maintain local norms and spaces. Little attention has been paid to the opposite: indicators of proactive investment in the neighborhood's upkeep. This manuscript presents a methodology that translates a database of approved building permits into an ecometric of investment by community members, establishing basic content, criteria for reliability, and construct validity. A database from Boston, MA contained 150,493 permits spanning 2.5 years, each record including the property to be modified, permit type, and date issued. Investment was operationalized as the proportion of properties in a census block group that underwent an addition or renovation, excluding larger developments involving the demolition or construction of a building. The reliability analysis found that robust measures could be generated every 6 months, and that longitudinal analysis could differentiate between trajectories across neighborhoods. The validity analysis supported two hypotheses: investment was best predicted by homeownership and median income; and maintained an independent relationship with measures of physical disorder despite controlling for demographics, implying that it captures the other end of a spectrum of neighborhood maintenance. Possible uses for the measure in research and policy are discussed.

  15. 75 FR 4554 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' The 2008 CGP...

  16. Environmental Assessment For the Proposed Construction and Operation of a Consolidated Fuels Facility and the Demolition of the Existing Fuel Farm at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2005-12-01

    1-2 lntemattonal Airport Buckley AFB, Colorado Prepared By 460th CEV Last Revised 21 July 2005 SECTION 1.0 PURPOSE OF AND NEED FOR THE ACTION...88°F in July and low is l5°F in January. Monthly precipitation fluctuates throughout the year 15 with the wettest months being May through June. The...Operating Permit No. 950PAR118. This permit was originally issued on 28 August 1997, was 19 most recently reissued 0 I July 2002, and will expire 30

  17. Hazardous Waste Site Analysis (Small Site Technology)

    DTIC Science & Technology

    1990-08-01

    Act HSRT - Hazardous Substance Response Trust (Superfund Trust) HSWA - Hdzardeus and Solid Waste Amendments (to RCRA) NAAQSD - National Ambient Air...impoundments (basically, any area where hazardous substances are located). * Under CERCLA, "Environment" includes surface and groundwater, ambient air, land...34 provisions with permit requirements for new source construction). " Ambient Air Quality standards (NAAQs) have been issued for six "criteria" pollutants

  18. 78 FR 28547 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... each construction permit exemption claim. WDNR held public hearings on June 27, 28 and 29, 2006, for... required to respond to the construction permit exemption claim submitted. NR 406.04(1q)(1) and (5) for... pollution from construction permit requirements. EPA is proposing to approve these revisions because they...

  19. 50 CFR 25.41 - Who issues refuge permits?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Who issues refuge permits? 25.41 Section... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Permits § 25.41 Who issues refuge permits? We authorize the refuge manager of the facility where an activity is to take place to issue...

  20. 75 FR 61752 - Auction of FM Broadcast Construction Permits Scheduled for March 29, 2011; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...

  1. 75 FR 56147 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... received. Permits were issued on September 9, 2010 to: Sam Feola Permit No. 2011-009. Sam Feola Permit No. 2011-010. Sam Feola Permit No. 2011-011. Sam Feola Permit No. 2011-012. Sam Feola Permit No. 2011-013. Sam Feola Permit No. 2011-014. Sam Feola Permit No. 2011-015. Nadene G. Kennedy, Permit Officer. [FR...

  2. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  3. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  4. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  5. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  6. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  7. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  8. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  9. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  10. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  11. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  12. 40 CFR 49.155 - Permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...

  13. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  14. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  15. 76 FR 51349 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... information from state and local building permit officials needed for updating the universe of permit-issuing... add new permit-issuing places to the universe, delete places no longer issuing permits, and make changes to the universe to reflect those places that have merged. Failure to maintain the universe of...

  16. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  17. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  18. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  19. 25 CFR 700.711 - Grazing permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES New Lands... residency on the New Lands Range Unit of permit issue, and (4) Own livestock which graze on the range unit of permit issue. (c) Permits will be issued for a base of 80 SUYL (20 AU) and may not be divided or...

  20. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...

  1. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  2. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  3. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  4. 36 CFR 13.932 - How many permits will be issued each summer?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Preserve Motor Vehicle Permits § 13.932 How many permits will be issued each summer? The superintendent is...

  5. 36 CFR 13.932 - How many permits will be issued each summer?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Preserve Motor Vehicle Permits § 13.932 How many permits will be issued each summer? The superintendent is...

  6. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  7. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  8. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  9. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  10. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  11. 77 FR 53923 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... civilian support contractor, Lockheed Martin, Antarctic Support Contract took over on April 1, 2012... No. 2011-013 Permit No. 2011-014 Permit No. 2011-015 Lockheed Martin has been issued some permits to...

  12. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  13. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  14. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  15. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  16. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  17. 40 CFR 220.4 - Authorities to issue permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Authorities to issue permits. 220.4 Section 220.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING GENERAL § 220.4 Authorities to issue permits. (a) Determination by Administrator. The Administrator, or such...

  18. 14 CFR 413.19 - Issuing a license or permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Issuing a license or permit. 413.19 Section 413.19 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE APPLICATION PROCEDURES § 413.19 Issuing a license or permit...

  19. 40 CFR 220.4 - Authorities to issue permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Authorities to issue permits. 220.4 Section 220.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING GENERAL § 220.4 Authorities to issue permits. (a) Determination by Administrator. The Administrator, or such...

  20. Nevada NPDES Permits

    EPA Pesticide Factsheets

    In Nevada, EPA’s Pacific Southwest (Region 9) issues all NPDES permits for any discharges on tribal lands. All other NPDES permits are issued by the Nevada Division of Environmental Protection (NDEP).

  1. 41 CFR 102-74.480 - How many days does a Federal agency have to issue a permit following receipt of a completed...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How many days does a Federal agency have to issue a permit following receipt of a completed application? 102-74.480 Section 102... Buildings Permits § 102-74.480 How many days does a Federal agency have to issue a permit following receipt...

  2. Evaluating the effectiveness of best management practices and green infrastructure in the State of California

    EPA Science Inventory

    Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...

  3. Massport Logan International Airport NPDES Permit | NPDES ...

    EPA Pesticide Factsheets

    2017-08-28

    Massport was issued a permit for discharging storm water to Boston Harbor on March 1, 1978. The permit expired five years later. However, EPA administratively continued the permit as allowed by regulations. EPA issued a draft permit and fact sheet (which provides EPA's technical basis for establishing effluent limits and monitoring) for public comment on July 25, 2006.

  4. 76 FR 66089 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF...

  5. 77 FR 64831 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish...

  6. 77 FR 64831 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of a permit modification issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to...

  7. 76 FR 67485 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish...

  8. 77 FR 50533 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice...

  9. 76 FR 47611 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation...

  10. 77 FR 35068 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice...

  11. 77 FR 31044 - Permits Issued Under the Antarctic Conservation Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... NATIONAL SCIENCE FOUNDATION Permits Issued Under the Antarctic Conservation Act AGENCY: National... 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice of permits... CONTACT: Nadene G. Kennedy, Permit Office, Office of Polar Programs, Rm. 755, National Science Foundation...

  12. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  13. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  14. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  15. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  16. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  17. 40 CFR 124.1 - Purpose and scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... issuing, modifying, revoking and reissuing, or terminating all RCRA, UIC, PSD and NPDES “permits... requirements for PSD permits. Subpart D contains specific procedural requirements for NPDES permits. Subpart G...)). Part 124 does not apply to PSD permits issued by an approved State. (f) To coordinate decisionmaking...

  18. 40 CFR 124.1 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... issuing, modifying, revoking and reissuing, or terminating all RCRA, UIC, PSD and NPDES “permits... requirements for PSD permits. Subpart D contains specific procedural requirements for NPDES permits. Subpart G...)). Part 124 does not apply to PSD permits issued by an approved State. (f) To coordinate decisionmaking...

  19. 40 CFR 124.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... issuing, modifying, revoking and reissuing, or terminating all RCRA, UIC, PSD and NPDES “permits... requirements for PSD permits. Subpart D contains specific procedural requirements for NPDES permits. Subpart G...)). Part 124 does not apply to PSD permits issued by an approved State. (f) To coordinate decisionmaking...

  20. 40 CFR 124.1 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... issuing, modifying, revoking and reissuing, or terminating all RCRA, UIC, PSD and NPDES “permits... requirements for PSD permits. Subpart D contains specific procedural requirements for NPDES permits. Subpart G...)). Part 124 does not apply to PSD permits issued by an approved State. (f) To coordinate decisionmaking...

  1. 40 CFR 124.1 - Purpose and scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... issuing, modifying, revoking and reissuing, or terminating all RCRA, UIC, PSD and NPDES “permits... requirements for PSD permits. Subpart D contains specific procedural requirements for NPDES permits. Subpart G...)). Part 124 does not apply to PSD permits issued by an approved State. (f) To coordinate decisionmaking...

  2. Commence Construction Under PSD

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. Agreement that the PSD Regulations Require a Source to Commence Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. Construction Activities at Georgia Pacific

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Deadline for Commencement of Construction of the Eastport Refinery

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Guidance for Proposed Construction at Buckeye Cellulose Corporation

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. PSD Regulations - Interpretation of Commencement of Construct

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  9. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  10. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  11. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  12. 46 CFR 287.7 - Circumstances permitting reimbursement from a construction reserve fund.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Circumstances permitting reimbursement from a... Circumstances permitting reimbursement from a construction reserve fund. (a) Payments prior to establishment of... this part, draw against such fund as reimbursement for the amount, if any, of other funds which, with...

  13. 41 CFR 102-74.505 - What action must Federal agencies take after disapproving an application or canceling an issued...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agencies take after disapproving an application or canceling an issued permit? 102-74.505 Section 102-74... after disapproving an application or canceling an issued permit? Upon disapproving an application or canceling a permit, Federal agencies must promptly— (a) Notify the applicant or permittee of the reasons for...

  14. 27 CFR 1.35 - Authority to issue, amend, deny, suspend, revoke, or annul basic permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Authority to issue, amend, deny, suspend, revoke, or annul basic permits. 1.35 Section 1.35 Alcohol, Tobacco Products and Firearms... SALES AND BOTTLING OF DISTILLED SPIRITS Basic Permits Authorization § 1.35 Authority to issue, amend...

  15. 30 CFR 773.21 - Initial review and finding requirements for improvidently issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.21 Initial review and finding requirements for improvidently issued permits. (a) If we, the regulatory authority... paragraph (c) of this section, you may challenge the preliminary finding by providing us with evidence as to...

  16. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  17. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  18. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  19. 25 CFR 166.316 - Can a permittee construct improvements on permitted Indian land?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a permittee construct improvements on permitted Indian land? 166.316 Section 166.316 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation Practices and Improvements § 166...

  20. 78 FR 40968 - Notice of Extension of Deadline to Commence Construction Under Clean Air Act Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...

  1. 77 FR 16853 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... construction of a commercial development, and seeks a 5-year permit. The 7.7-ac project is located on parcel 09... project includes construction of a commercial development and the associated infrastructure, and...

  2. 15 CFR 971.600 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Environmental Effects § 971.600... in a significant adverse environmental effect. In addition, each permit issued must contain TCRs... (section 109(b)), to prevent a significant adverse environmental effect. Furthermore, each permit issued...

  3. 77 FR 36604 - Office of Hazardous Materials Safety Actions on Special Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... special permits were issued. Issued in Washington, DC, on June 12, 2012. Donald Burger, Chief, Special.... 15531-M National Aeronautics 49 CFR Section To modify the special permit originally and Space 173.302(a... prior to shipment. (mode 2) EMERGENCY SPECIAL PERMIT GRANTED 15634-N SodaStream USA Inc., 49 CFR 171.2(k...

  4. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  5. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  6. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  7. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  8. 76 FR 24874 - Initiation of Scoping for an Environmental Assessment (EA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ...) General Permit for Discharges from Construction Activities. The EA will evaluate the potential environmental impacts from the discharge of pollutants associated with stormwater runoff from construction... days of the date of the publication of the Proposed Construction General Permit in the Federal Register...

  9. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  10. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  11. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  12. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  13. 25 CFR 166.317 - What happens to improvements constructed on Indian lands when the permit has been terminated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to improvements constructed on Indian lands when the permit has been terminated? 166.317 Section 166.317 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation...

  14. 78 FR 63489 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    .... Herrington, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE15414B-0... construction of commercial developments, and they seek a 10-year permit. The 7.81-ac project is located on... East, Lake County, Florida. The project includes construction of a commercial development and the...

  15. Canyon Day Sand and Gravel Wash Process Plant: Draft NPDES Permit AZ0024511

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to issue NPDES Permit No.permit renewal (No. AZ0024511) to White Mountain Apache Tribe Canyon Day Sand and Gravel Wash Process Plant, Greer, Arizona.

  16. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  17. Austin chalk maintains brisk drilling pace

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-04-01

    Horizontal drilling in the Cretaceous Austin chalk trend of South Texas continues to set a fast pace. The Texas Railroad Commission has issued nearly 900 permits to drill horizontal wells in the Pearsall field area alone from 1984 through February 1991. TRC issued 1,485 permits for horizontal wells statewide during that period, including 1,285 since Jan. 1, 1990. Statewide, operators have reported completion of 685 horizontal wells. That includes 472 in Pearsall field, where TRC has issued 882 permits, and 121 in Giddings field, where 305 permits have been issued. Frio County, site of Pearsall field, led Texas counties withmore » 494 permits and 278 horizontal completions. Oil drilling and reentry work is under way in many areas, and horizontal Austin chalk gas/condensate completions have been reported in Dimmit and Burleson counties.« less

  18. Polynomial Conjoint Analysis of Similarities: A Model for Constructing Polynomial Conjoint Measurement Algorithms.

    ERIC Educational Resources Information Center

    Young, Forrest W.

    A model permitting construction of algorithms for the polynomial conjoint analysis of similarities is presented. This model, which is based on concepts used in nonmetric scaling, permits one to obtain the best approximate solution. The concepts used to construct nonmetric scaling algorithms are reviewed. Finally, examples of algorithmic models for…

  19. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  20. 77 FR 47065 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...

  1. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  2. 24-Month Baseline Period Outside of the Contemperaneous 5-Years Before Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. Final Environmental Assessment for the Proposed Construction and Operation of a Live Fire-Fighting Training Area at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2004-06-01

    No. 950PAR118. This permit was originally issued on 28 August 1997, most recently reissued as of 01 July 2002, and expires 30 June 2007 (BAFB 2001...In July 2002, the CDPHE performed an inspection of stationary source emission units and determined that BAFB was in compliance with the Title V...during the winter, spring, and fall to 9.8 million gallons for the summer months, such as July . 3.11 HAZARDOUS MATERIALS AND SUBSTANCES The ROI for

  4. 50 CFR 697.8 - Vessel identification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... limited access American lobster permit and over 25 ft (7.6 m) in registered length must: (1) Have affixed... fishing vessel issued a limited access American lobster permit must display its official number in block... each vessel issued a limited access American lobster permit shall ensure that— (1) The vessel's name...

  5. 50 CFR 697.8 - Vessel identification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... access American lobster permit and over 25 ft (7.6 m) in registered length must: (1) Have affixed... fishing vessel issued a limited access American lobster permit must display its official number in block... each vessel issued a limited access American lobster permit shall ensure that— (1) The vessel's name...

  6. 50 CFR 648.15 - Facilitation of enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ocean quahog open access permitted vessels. Vessel owners or operators issued an open access surfclam or ocean quahog open access permit for fishing in the ITQ Program, as specified at § 648.70, are required... limited access permitted vessels. Beginning January 1, 2009, vessel owners or operators issued a limited...

  7. 40 CFR 72.80 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Permit Revisions § 72.80 General. (a) This subpart shall govern revisions to any Acid Rain permit issued by the Administrator and to the Acid Rain portion of any operating permit issued by a State... 71 of this chapter, the provisions of this subpart shall govern revision of any Acid Rain Program...

  8. 40 CFR 72.80 - General.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Permit Revisions § 72.80 General. (a) This subpart shall govern revisions to any Acid Rain permit issued by the Administrator and to the Acid Rain portion of any operating permit issued by a State... 71 of this chapter, the provisions of this subpart shall govern revision of any Acid Rain Program...

  9. 40 CFR 72.80 - General.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Permit Revisions § 72.80 General. (a) This subpart shall govern revisions to any Acid Rain permit issued by the Administrator and to the Acid Rain portion of any operating permit issued by a State... 71 of this chapter, the provisions of this subpart shall govern revision of any Acid Rain Program...

  10. 40 CFR 72.80 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Permit Revisions § 72.80 General. (a) This subpart shall govern revisions to any Acid Rain permit issued by the Administrator and to the Acid Rain portion of any operating permit issued by a State... 71 of this chapter, the provisions of this subpart shall govern revision of any Acid Rain Program...

  11. 40 CFR 72.80 - General.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Permit Revisions § 72.80 General. (a) This subpart shall govern revisions to any Acid Rain permit issued by the Administrator and to the Acid Rain portion of any operating permit issued by a State... 71 of this chapter, the provisions of this subpart shall govern revision of any Acid Rain Program...

  12. 50 CFR 300.123 - Certificates and permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to obtain an annual certificate issued by the Republic of Colombia and an annual vessel permit issued... Colombia if: (i) The application is complete. (ii) The applicant has complied with all applicable reporting... Republic of Colombia. (d) Duration. A certificate and permit are valid for the calendar year for which they...

  13. 50 CFR 300.123 - Certificates and permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to obtain an annual certificate issued by the Republic of Colombia and an annual vessel permit issued... Colombia if: (i) The application is complete. (ii) The applicant has complied with all applicable reporting... Republic of Colombia. (d) Duration. A certificate and permit are valid for the calendar year for which they...

  14. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular ormore » valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.« less

  15. Apparatus For Measuring The Concentration Of A Species At A Distance

    DOEpatents

    Rice, Steven F.; Allendorf, Mark D.

    2006-04-11

    Corrosion of refractory silica brick and air quality issues due to particulate emissions are two important glass manufacturing issues that have been tied to sodium vapor and its transport throughout the melt tank. Knowledge of the relationship between tank operating conditions and tank atmosphere sodium levels are therefore important considerations in correcting corrosion and air quality issues. However, until recently direct quantitative measurements of sodium levels has been limited to extractive sampling methods followed by laboratory analysis. Excimer laser induced fragmentation (ELIF) fluorescence spectroscopy is a technique that permits the measurement of volatilized NaOH in high temperature environments on a timescale of less than one second. The development of this method and the construction of field-portable instrumentation for glass furnace applications are herein disclosed. The method is shown to be effective in full-scale industrial settings. Characteristics of the method are outlined, including equipment configuration, detection sensitivity, and calibration methodology.

  16. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  17. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  18. 47 CFR 1.2003 - Applications affected.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...

  19. 30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...

  20. 50 CFR 697.6 - Dealer permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... transport on land), American lobster from the owner or operator of a vessel issued a valid permit under this...), American lobster, managed by this part, must have been issued, and have in his/her possession, a valid... enforcement-related permit sanctions and denials, found at subpart D of 15 CFR part 904. (n) Lobster dealer...

  1. 50 CFR 697.6 - Dealer permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transport on land), American lobster from the owner or operator of a vessel issued a valid permit under this...), American lobster, managed by this part, must have been issued, and have in his/her possession, a valid... enforcement-related permit sanctions and denials, found at subpart D of 15 CFR part 904. (n) Lobster dealer...

  2. 50 CFR 665.243 - Prohibitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... crustacean management area except as provided in § 665.245. (5) Maintain on board the vessel or in the water... vessel that has a limited access permit issued under § 665.242 any lobster trap in Crustacean Permit Area... issued under this subpart any lobster trap in Crustacean Permit Area 1 VMS Subarea when fishing for...

  3. 50 CFR 665.243 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... crustacean management area except as provided in § 665.245. (5) Maintain on board the vessel or in the water... vessel that has a limited access permit issued under § 665.242 any lobster trap in Crustacean Permit Area... issued under this subpart any lobster trap in Crustacean Permit Area 1 VMS Subarea when fishing for...

  4. 50 CFR 665.243 - Prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... crustacean management area except as provided in § 665.245. (5) Maintain on board the vessel or in the water... vessel that has a limited access permit issued under § 665.242 any lobster trap in Crustacean Permit Area... issued under this subpart any lobster trap in Crustacean Permit Area 1 VMS Subarea when fishing for...

  5. Mississippi SIP: Title 11, Part 2, Chapter 2 - Permit Regulations for the Construction and/or Operation of Air Emissions Equipment

    EPA Pesticide Factsheets

    Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations

  6. 47 CFR 73.3500 - Application and report forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...

  7. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  8. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  9. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  10. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  11. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  12. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  13. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  14. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  15. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  16. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  17. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  18. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  19. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  20. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  1. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  2. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  3. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  4. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  5. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  6. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  7. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  8. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  9. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  10. 14 CFR 21.199 - Issue of special flight permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Issue of special flight permits. 21.199 Section 21.199 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Airworthiness Certificates § 21.199 Issue of...

  11. Iowa SIP: Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

    EPA Pesticide Factsheets

    EPA Approved Iowa Regulations - 40 CFR 52.820(c) Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

  12. 77 FR 7148 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Shelf Permits Issued to Shell Gulf of Mexico, Inc., and Shell Offshore, Inc. for the Discoverer... Clean Air Act Outer Continental Shelf (OCS) permit applications, one from Shell Gulf of Mexico, Inc., for operation of the Discoverer drillship in the Chukchi Sea and one from Shell Offshore, Inc...

  13. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... (CONTINUED) WATER PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.10 Public notice... Act for the same facility or activity (including EPA when the draft permit is prepared by the State...

  14. 50 CFR 648.204 - Possession restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in Area 1 only if issued an open access herring permit or a Limited Access Incidental Catch Herring... issued an open access herring permit may not fish for, possess, or land more than 6,600 lb (3 mt) of... access herring permit to fish for, possess, or land more than 6,600 lb (3 mt) of Atlantic herring from or...

  15. 50 CFR 21.27 - Special purpose permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose permits. Permits may be issued for special purpose activities related to migratory birds, their parts... special purpose permit for migratory bird related activities not otherwise provided for in this part may...

  16. LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory

    This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimentalmore » study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.« less

  17. 14 CFR 413.19 - Issuing a license or permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Issuing a license or permit. 413.19 Section 413.19 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION.... After the FAA completes its reviews and makes the decisions required by this chapter, the FAA issues a...

  18. 14 CFR 413.19 - Issuing a license or permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Issuing a license or permit. 413.19 Section 413.19 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION.... After the FAA completes its reviews and makes the decisions required by this chapter, the FAA issues a...

  19. 14 CFR 413.19 - Issuing a license or permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Issuing a license or permit. 413.19 Section 413.19 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION.... After the FAA completes its reviews and makes the decisions required by this chapter, the FAA issues a...

  20. 14 CFR 413.19 - Issuing a license or permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Issuing a license or permit. 413.19 Section 413.19 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION.... After the FAA completes its reviews and makes the decisions required by this chapter, the FAA issues a...

  1. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    PubMed

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  2. Easiness of Legal Access to Concealed Firearm Permits and Homicide Rates in the United States.

    PubMed

    Siegel, Michael; Xuan, Ziming; Ross, Craig S; Galea, Sandro; Kalesan, Bindu; Fleegler, Eric; Goss, Kristin A

    2017-12-01

    To examine the relation of "shall-issue" laws, in which permits must be issued if requisite criteria are met; "may-issue" laws, which give law enforcement officials wide discretion over whether to issue concealed firearm carry permits or not; and homicide rates. We compared homicide rates in shall-issue and may-issue states and total, firearm, nonfirearm, handgun, and long-gun homicide rates in all 50 states during the 25-year period of 1991 to 2015. We included year and state fixed effects and numerous state-level factors in the analysis. Shall-issue laws were significantly associated with 6.5% higher total homicide rates, 8.6% higher firearm homicide rates, and 10.6% higher handgun homicide rates, but were not significantly associated with long-gun or nonfirearm homicide. Shall-issue laws are associated with significantly higher rates of total, firearm-related, and handgun-related homicide.

  3. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  4. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  5. 50 CFR 19.31 - State permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS (CONTINUED) AIRBORNE HUNTING State Permits and Annual Report Requirements § 19.31 State permits..., domestic animals, human life or crops. States may not issue permits for the purpose of sport hunting. (b...

  6. 49 CFR 385.413 - What happens if a motor carrier receives a proposed safety rating that is less than Satisfactory?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... proposed safety rating that is less than Satisfactory? 385.413 Section 385.413 Transportation Other... Satisfactory? (a) If a motor carrier does not already have a safety permit, it will not be issued a safety permit (including a temporary safety permit) unless and until a Satisfactory safety rating is issued to...

  7. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  8. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  9. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  10. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  11. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  12. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  13. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  14. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  15. 50 CFR 19.31 - State permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS (CONTINUED) AIRBORNE HUNTING State Permits and Annual Report Requirements § 19.31 State permits. (a) Except as provided in § 19.3, States may issue permits to persons to engage in airborne hunting...

  16. Special and Research Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Special permits and research permits under the Marine Protection, Research and Sanctuaries Act may be issued by EPA for ocean dumping. Examples and ocean disposal sites for special and research permits are provided.

  17. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...

  18. 50 CFR 697.12 - At-sea sea sampler/observer coverage.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... may request any vessel issued a Federal limited access American lobster permit to carry a NMFS... issued a Federal limited access American lobster permit, if requested by the sea sampler/observer also...

  19. 50 CFR 697.12 - At-sea sea sampler/observer coverage.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... may request any vessel issued a Federal limited access American lobster permit to carry a NMFS... issued a Federal limited access American lobster permit, if requested by the sea sampler/observer also...

  20. 78 FR 5288 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... issue Research, Development, and Demonstration (RD&D) Permits to owners and operators of MSWLF in accordance with its State law. On March 22, 2004, EPA issued final regulations allowing research, development...

  1. 'May issue' gun carrying laws and police discretion: Some evidence from Massachusetts.

    PubMed

    Hemenway, David; Hicks, James G

    2015-08-01

    In almost all states in the United States, to carry a concealed handgun legally requires a permit from the police. Many states have changed from may-issue laws (where the local police chief has discretion about to whom to issue a license) to shall-issue laws (where the police chief must issue a permit if the applicant passes a computerized federal background check). Studies conflict on the effect on crime. None considered the situation in may-issue states when police used discretion and refused to issue a permit. We provide suggestive evidence from a December 2013 survey of police chiefs in Massachusetts' 351 cities and towns. Of the 121 responding police chiefs, a large majority favored retaining police discretion. Chiefs issued few discretionary denials - median 2 per year, citing providing false information, a history of assault (often domestic violence), a history of drug or alcohol abuse, or of mental-health issues as the most common reasons for denial.

  2. ClimatePad: Enabling public exploration of climate data

    NASA Astrophysics Data System (ADS)

    Walsh, J. E.; Chapman, W. L.

    2012-12-01

    Informal learners interested in climate issues can find a wealth of information in the print and online media related to climate and climate change. Throughout these resources, the equal use of generic terms like 'global warming' and 'climate change' suggest a level of nuance in the science that is not easy to convey in this conventional media. Perhaps more than any other discipline, climate literacy has the most potential to be enhanced via the process of cognitive construction and reconstruction, rather than simple transmission of knowledge. Constructionism suggests that meaningful learning happens most effectively if the learner is actively engaged in constructing a product in the real world rather than absorbing information passively. Recent technological innovations have introduced mobile computing devices with sufficient power to do serious data analysis. The potential of these devices to augment climate literacy by turning citizens into scientists has yet to be exploited. We introduce ClimatePad, an iPad application that permits students and public to actively browse climate datasets, construct trends, plot time series, create composite differences and view animations of real-world climate data. Interactions with the ClimatePad permits varying the starting and ending dates of trends and differences. Climate analysis maps and animations can be customized with different color palettes, enticing the user to delve into and absorb the subtleties of the regional and temporal variations of the recent climate record. Finally, user-generated climate visualizations created with ClimatePad can be emailed to friends and shared via Facebook, entraining even more active learners.

  3. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Act (Act) by WildEarth Guardians (Petitioner), to object to WDEQ's June 7, 2011 Permit (Permit) issued...Earth Petitioner dated August 4, 2011, requesting that EPA object to the issuance of the Permit to CLF&P...

  4. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  5. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  6. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  7. 76 FR 52946 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...This document announces that the EPA Administrator has responded to a citizen petition asking EPA to object to an operating permit (Permit Number P026R2) issued by the New Mexico Environment Department, Air Quality Bureau (NMED). Specifically, the Administrator has granted the April 14, 2010 petition, submitted by WildEarth Guardians and San Juan Citizens Alliance (Petitioners) to object to the March 19, 2010, operating permit issued to Williams Four Corners, LLC, for the Sims Mesa Central Delivery Point (CDP) compressor station in northwestern Rio Arriba County, New Mexico. Pursuant to sections 307(b) and 505(b)(2) of the Clean Air Act (CAA), a petition for judicial review of those parts of the Order that deny issues in the petition may be filed in the United States Court of Appeals for the appropriate circuit within 60 days from the date this notice appears in the Federal Register.

  8. Long-term purity assessment in succinonitrile

    NASA Astrophysics Data System (ADS)

    Rubinstein, E. R.; Tirmizi, S. H.; Glicksman, M. E.

    1990-11-01

    Container materials for crystal growth chambers must be carefully selected in order to prevent sample contamination. To address the issue of contamination, high purity SCN was exposed to a variety of potential chamber construction materials, e.g., metal alloys, soldering materials, and sealants, at a temperature approximately 25 K above the melting point of SCN (58°C), over periods of up to one year. Acceptability, or lack thereof, of candidate chamber materials was determined by performing periodic melting point checks of the exposed samples. Those materials which did not measurably affect the melting point of SCN over a one-year period were considered to be chemically compatible and therefore eligible for use in constructing the flight chamber. A growth chamber constructed from compatible materials (304 SS and borosilicate glass) was filled with pure SCN. A thermistor probe placed within the chamber permitted in situ measurement of the melting point and, indirectly, of the purity of the SCN. Melting point plateaus were then determined, to assess the actual chamber performance.

  9. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  10. 75 FR 56106 - Notice of Prevention of Significant Deterioration Final Determination for Power Holdings of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Deterioration (PSD) permit issued to Power Holdings of Illinois, LLC, by the Illinois Environmental Protection... under authority of a PSD delegation agreement, issued a PSD permit to Power Holdings of Illinois, LLC...

  11. Operating Permit Program Approval Issues

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Critical success factors for competitiveness of construction companies: A critical review

    NASA Astrophysics Data System (ADS)

    Hanafi, Abdul Ghafur; Nawi, Mohd Nasrun Mohd

    2016-08-01

    Making progress basically, a fundamental issue for the construction companies to get by in a highly competitive industry. From time to time, industry players are facing stiff and tough competition due to large number of players, whether existing or new players involved from various background and track record. Furthermore, the large numbers of component deciding the competitiveness of contractors, whose organization structures and governance have turned out to be more muddled. Different construction companies have their own unique criteria which may differ from one to another. The enormous amount of issues needs to bring down to manageable numbers so that measures can be identified and scrutinized to enhance competitiveness. This paper discusses the result from the critical investigation from past studies in the Asian countries, namely China, India, Thailand, Singapore and Malaysia. Several fundamental factors have been identified as CSFs in construction companies in respective country. Also highlighted a critical survey based upon various literatures written on this subject where critical success factors (CSFs) as a yardstick to gauge the relationship among CSFs in various construction companies in the Asian region. Far reaching estimation of an organization's performance and resulting input to its supervision is crucial for business change. Estimation additionally empowers organizations to be contrasted from one another on the premise of institutionalized data, permitting best practices to be distinguished and connected more widely. Different countries have their own set of critical success factors (CSFs) which may differ in term of priority and at the same time share common elements of success factor in accomplishment as a construction companies. The study, which is exploratory in nature, embraced the content investigation and inductive technique to accomplish its objectives.

  13. Comparison of Housing Construction Development in Selected Regions of Central Europe

    NASA Astrophysics Data System (ADS)

    Dvorský, Ján; Petráková, Zora; Hollý, Ján

    2017-12-01

    In fast-growing countries, the economic growth, which came after the global financial crisis, ought to be manifested in the development of housing policy. The development of the region is directly related to the increase of the quality of living of its inhabitants. Housing construction and its relation with the availability of housing is a key issue for population overall. Comparison of its development in selected regions is important for experts in the field of construction, mayors of the regions, the state, but especially for the inhabitants themselves. The aim of the article is to compare the number of new dwellings with building permits and completed dwellings with final building approval between selected regions by using a mathematical statistics method - “Analysis of variance”. The article also uses the tools of descriptive statistics such as a point graph, a graph of deviations from the average, basic statistical characteristics of mean and variability. Qualitative factors influencing the construction of flats as well as the causes of quantitative differences in the number of started apartments under construction and completed apartments in selected regions of Central Europe are the subjects of the article’s conclusions.

  14. Emergencies and Emergency Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Emergency permits under the MPRSA are issued if disposed material poses a threat to human health. Information is provided on emergency permit examples and disposal sites. Emergencies to safeguard life at sea does not require an ocean dumping permit.

  15. 14 CFR 437.9 - Issuance of an experimental permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches or...

  16. 14 CFR 437.5 - Eligibility for an experimental permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch or...

  17. 14 CFR 437.5 - Eligibility for an experimental permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch or...

  18. 14 CFR 437.5 - Eligibility for an experimental permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch or...

  19. 14 CFR 437.9 - Issuance of an experimental permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches or...

  20. 14 CFR 437.5 - Eligibility for an experimental permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch or...

  1. 14 CFR 437.9 - Issuance of an experimental permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches or...

  2. 14 CFR 437.9 - Issuance of an experimental permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches or...

  3. 14 CFR 437.5 - Eligibility for an experimental permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch or...

  4. 14 CFR 437.9 - Issuance of an experimental permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches or...

  5. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  6. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  7. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  8. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 12 2014-10-01 2014-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  9. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  10. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  11. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  12. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this...

  13. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  14. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  15. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  16. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  17. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  18. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  19. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  20. FNF Construction, Inc. Coverage under General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country

    EPA Pesticide Factsheets

    Documents related to the FNF Construction, Inc. Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country to be Located near Ganado, Arizona on the Navajo Nation.

  1. 77 FR 18923 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...

  2. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... permit program for pre- construction review of certain new and modified major stationary sources in... program as required by section 165 of the CAA for certain new and modified major stationary sources... the CAA requires states to adopt a pre-construction permitting program for certain new and modified...

  3. 76 FR 9809 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE35022A-0, U.S. Fish and... ac of occupied Florida scrub-jay foraging and sheltering habitat incidental to construction of a... construction of a commercial center and the associated infrastructure, and landscaping. The applicant proposes...

  4. Aligning oversize/overweight permit fees with agency costs : critical issues.

    DOT National Transportation Integrated Search

    2013-08-01

    This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options : due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structur...

  5. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... which may affect aircraft operations or for purposes associated with seaplane operations; (vii) For PSD...

  6. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... other agency which the Director knows has issued or is required to issue a RCRA, UIC, PSD (or other... operations; (vii) For PSD permits only, affected State and local air pollution control agencies, the chief...

  7. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... other agency which the Director knows has issued or is required to issue a RCRA, UIC, PSD (or other... operations; (vii) For PSD permits only, affected State and local air pollution control agencies, the chief...

  8. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... other agency which the Director knows has issued or is required to issue a RCRA, UIC, PSD (or other... operations; (vii) For PSD permits only, affected State and local air pollution control agencies, the chief...

  9. Proposed Reopening of NPDES Permit for NTUA Tuba City WWTF

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to reopen a National Pollutant Discharge Elimination System (NPDES) permit NN0020290 issued to the Navajo Tribal Utility Authority (NTUA) Tuba City Wastewater Treatment Facility.

  10. 50 CFR 22.12 - What activities are illegal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Aquila chrysaetos), or the parts, nests, or eggs of these birds, and we will not issue a permit to... eagle, or any live egg of those birds, and we will not issue a permit to authorize these acts. [64 FR...

  11. Ministerial Resolution No. 87, 1989. [Summary].

    PubMed

    1989-01-01

    A Ministerial Resolution passed in 1989 in Kuwait amended private sector recruitment regulations to encourage the employment of Kuwaiti and other Gulf nationals. The resolution gave local labor authorities the responsibility of issuing work permits. Foreign workers can gain a work permit is 1) no Kuwaiti or Gulf nationals are available, 2) the recruitment can be justified, and 3) the foreign worker's skills conform with the business activity and needs of the enterprise seeking the permit. Workers hired without a permit will be deported at the employer's expense, and the employer will be banned from receiving any other work permits for up to 6 months. In addition, permit holders can only work for the employer who acquired the permit on their behalf. Self-employed foreign workers will receive a permit when they are associated with a local company and receive a license to work on an independent basis. Aliens who have been practicing an activity for at least 10 years, however, and are over age 30 and have recognized domicile will be issued a 3-year renewable permit. Work permits are not transferrable to another employer for 3 years from the date of issue. Government contractors, however, will receive permits for the entire duration of a project, after which time the foreign workers will be repatriated unless they are transferred to another employer working on a similar government project. The Ministry of Labour may reject an application for a work permit, its renewal, or transfer and may cancel a work permit at any time. Repatriation costs are normally paid by the employer, unless the termination was initiated on disciplinary grounds or for failure to comply with contract terms or labor regulations. In these cases, the workers will pay their own repatriation costs.

  12. 76 FR 142 - Notice of Prevention of Significant Deterioration Final Determination for Russell City Energy Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Deterioration (PSD) Permit issued to Russell City Energy Center, LLC by the Bay Area Air Quality Management... under authority of a PSD delegation agreement dated February 4, 2008, issued a PSD permit to Russell... Petitions for Review of the PSD decision with the EAB. The EAB issued an Order denying the Petitions for...

  13. 49 CFR 385.407 - What conditions must a motor carrier satisfy for FMCSA to issue a safety permit?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... safety performance. (1) The motor carrier: (i) Must be in compliance with any remedial directive issued under subpart J of this part, and (ii) Must have a “Satisfactory” safety rating assigned by either FMCSA... FMCSA to issue a safety permit? 385.407 Section 385.407 Transportation Other Regulations Relating to...

  14. 49 CFR 385.407 - What conditions must a motor carrier satisfy for FMCSA to issue a safety permit?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... safety performance. (1) The motor carrier: (i) Must be in compliance with any remedial directive issued under subpart J of this part, and (ii) Must have a “Satisfactory” safety rating assigned by either FMCSA... FMCSA to issue a safety permit? 385.407 Section 385.407 Transportation Other Regulations Relating to...

  15. PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halverson, N; Ralph Nichols, R; Topher Berry, T

    2007-10-22

    A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximummore » limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.« less

  16. 75 FR 20874 - Agency Information Collection Activity Seeking OMB Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... to issue Experimental Permits for reusable suborbital rockets to authorize launches for the purpose... Suborbital Rockets. Type of Request: Extension without change of a currently approved collection. OMB Control... FAA's new authority to issue Experimental Permits for reusable [[Page 20875

  17. 78 FR 7837 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... Type of permit Cost per month Market-Maker Permit $5,000. Electronic Access Permit $1,000. SPXPM Tier... applicable month, and the cancelling Trading Permit Holder later requests issuance of the same type of Trading Permit for the remainder of that month, the Exchange may issue the same type of Trading Permit...

  18. 76 FR 30340 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... hydropower near the town of Ravenscroft, on Doe Creek, in White and Putnam Counties, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  19. 50 CFR 622.90 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Red Drum Fishery of the Gulf of Mexico § 622.90 Permits. (a) Dealer permits and conditions—(1) Permits. For a dealer to first receive Gulf red drum harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued...

  20. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  1. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  2. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  3. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  4. 78 FR 1203 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... research permits. SUMMARY: Notice is hereby given that NMFS has issued Permit 14808 to the California... to the California Department of Water Resources (CDWR), Permit 13791 to the United States Fish and... research permit (14808) was published in the Federal Register on April 24, 2012 (77 FR 24469). Permit 14808...

  5. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  6. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  7. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  8. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  9. 40 CFR 147.2906 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... substantial delay in oil or gas production, and injection will not result in movement of fluid into an USDW... permits to avoid a substantial delay in oil or gas production shall be issued only after a complete permit... notice procedure for a draft permit within 10 days after issuance. (3) An emergency permit may be oral or...

  10. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  11. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  12. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  13. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  14. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  15. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  16. 40 CFR 72.69 - Issuance and effective date of acid rain permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.69 Issuance and effective date of acid rain permits. (a) After the close of the public comment period, the Administrator will issue or deny an Acid Rain permit. The Administrator will serve a copy of any Acid Rain...

  17. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  18. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  19. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  20. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  1. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  2. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  3. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  4. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  5. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  6. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  7. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  8. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  9. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  10. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  11. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  12. February 3, 1997 Region V Letter Regarding Title V Permitting Issues

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. 77 FR 42488 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Panoche Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...

  14. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...

  15. FNF Construction Inc. Window Rock Airport Project: Coverage Under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country

    EPA Pesticide Factsheets

    Approved Request for Coverage under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country for FNF Construction Inc. Window Rock Airport Soil Cement Mixing Plant Project, Beacon Road, Window Rock, Arizona 86515.

  16. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  17. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  18. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  19. Application of CAA Section 112(g) to Coal- and Oil-Fired Electric Utility Steam Generating Units That Began Actual Construction or Reconstruction Between March 29, 2005 and March 14, 2008

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  1. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  2. Proposed Class II Permit MI-035-2R-0034: Fact Sheet and Draft Permit

    EPA Pesticide Factsheets

    EPA plans to issue a Class II permit for Muskegon Development Company’s Holcomb 1-22 well in Clare County, Mich. Document page contains factsheet about proposed UIC permit for Holcomb 1-22 well to Muskegon Development Company.

  3. 76 FR 1602 - Proposed Information Collection; Comment Request; Scientific Research, Exempted Fishing, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Collection; Comment Request; Scientific Research, Exempted Fishing, and Exempted Activity Submissions AGENCY... Exempted Fishing Permits (EFPs), Scientific Research Permits (SRPs), Display Permits, Letters of Acknowledgment (LOAs), and Shark Research Permits are issued under the authority of the Magnuson-Stevens Fishery...

  4. 40 CFR 72.68 - Response to comments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.68 Response to comments. (a) The... comments otherwise received. (b) In issuing or denying an Acid Rain permit, the Administrator will: (1...

  5. 40 CFR 72.68 - Response to comments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.68 Response to comments. (a) The... comments otherwise received. (b) In issuing or denying an Acid Rain permit, the Administrator will: (1...

  6. 40 CFR 72.68 - Response to comments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.68 Response to comments. (a) The... comments otherwise received. (b) In issuing or denying an Acid Rain permit, the Administrator will: (1...

  7. 40 CFR 72.68 - Response to comments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.68 Response to comments. (a) The... comments otherwise received. (b) In issuing or denying an Acid Rain permit, the Administrator will: (1...

  8. 40 CFR 72.68 - Response to comments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.68 Response to comments. (a) The... comments otherwise received. (b) In issuing or denying an Acid Rain permit, the Administrator will: (1...

  9. Vertical landscraping, a big regionalism for Dubai.

    PubMed

    Wilson, Matthew

    2010-01-01

    Dubai's ecologic and economic complications are exacerbated by six years of accelerated expansion, a fixed top-down approach to urbanism and the construction of iconic single-phase mega-projects. With recent construction delays, project cancellations and growing landscape issues, Dubai's tower typologies have been unresponsive to changing environmental, socio-cultural and economic patterns (BBC, 2009; Gillet, 2009; Lewis, 2009). In this essay, a theory of "Big Regionalism" guides an argument for an economically and ecologically linked tower typology called the Condenser. This phased "box-to-tower" typology is part of a greater Landscape Urbanist strategy called Vertical Landscraping. Within this strategy, the Condenser's role is to densify the city, facilitating the creation of ecologic voids that order the urban region. Delineating "Big Regional" principles, the Condenser provides a time-based, global-local urban growth approach that weaves Bigness into a series of urban-regional, economic and ecological relationships, builds upon the environmental performance of the city's regional architecture and planning, promotes a continuity of Dubai's urban history, and responds to its landscape issues while condensing development. These speculations permit consideration of the overlooked opportunities embedded within Dubai's mega-projects and their long-term impact on the urban morphology.

  10. Ground-water development and problems in Idaho

    USGS Publications Warehouse

    Crosthwaite, E.G.

    1954-01-01

    The development of groundwater for irrigation in Idaho, as most of you know, has proceeded at phenomenal rate since the Second World War. In the period 1907 to 1944 inclusive only about 328 valid permits and licenses to appropriate ground water were issued by the state. thereafter 28 permits became valid in 1945, 83 in 1946, and 121 in 1947. Sine 1947 permits and licenses have been issued at the rate of more than 400 a year.  

  11. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  12. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  13. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  14. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  15. 30 CFR 773.14 - Eligibility for provisionally issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 773.14 Section 773.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... surface coal mining and reclamation operation with— (1) A notice of violation issued under § 843.12 of...

  16. Ocean Disposal of Marine Mammal Carcasses

    EPA Pesticide Factsheets

    Ocean dumping of marine mammal carcasses is allowed with a permit issued by EPA under the Marine Protection, Research and Sanctuaries Act. Includes permit information, potential environmental impacts, and instructions for getting the general permit.

  17. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  18. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  19. 76 FR 12730 - Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... ENVIRONMENTAL PROTECTION AGENCY [Regional Docket Nos. V-2009-1, FRL-9276-7] Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel-Granite City Works AGENCY... operating permit issued by the Illinois Environmental Protection Agency to the U.S. Steel--Granite City...

  20. 78 FR 30917 - FFP Project 116, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 116, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  1. 78 FR 30917 - FFP Project 115, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 115, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  2. 15 CFR 904.301 - Bases for permit sanctions or denials.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Bases for permit sanctions or denials... PROCEDURES Permit Sanctions and Denials General § 904.301 Bases for permit sanctions or denials. (a) Unless... under this subpart with respect to any permit issued under the statutes cited in § 904.1(c). The bases...

  3. 75 FR 22434 - Exelon Nuclear Texas Holdings, LLC; Notice of Receipt and Availability of Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...

  4. 77 FR 34061 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  5. 78 FR 37565 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  6. 78 FR 56922 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  7. 78 FR 27255 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  8. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  9. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  10. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  11. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  12. 75 FR 68821 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...- megawatt (MW), 21-turbine Kaheawa Wind Power I (KWP I) project. Like KWP II, KWP I is owned by First Wind... wind turbine structures. The Hawaiian petrel and Newell's shearwater breed on Maui and feed in the open... the permit include the construction and operation of a new 21-megawatt, 14-turbine wind energy...

  13. 77 FR 16082 - In the Matter of All Power Reactor Licensees and Holders of Construction Permits in Active Or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ...) I The Licensees and construction permit (CP) holders\\1\\ identified in Attachment 1 to this Order... identified in Attachment 1 to this Order (i.e., Watts Bar, Unit 2; and Bellefonte, Units 1 and 2) [[Page... boiled dry, resulting in fuel damage.\\2\\ Fukushima demonstrated the confusion and misapplication of...

  14. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  15. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  16. 78 FR 50395 - Endangered Species; File Nos. 17557 and 17273

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... marine mammal and endangered species parts had been submitted by the above-named organizations. The requested permits have been issued under the authority of the Endangered Species Act of 1973, as amended... (File No. 17273), have been issued permits to take marine mammal and endangered species parts for...

  17. 76 FR 22677 - Endangered Species; File No. 14949

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... requested permit has been issued under the authority of the Endangered Species Act of 1973, as amended (ESA... exporting of endangered and threatened species (50 CFR parts 222-226). Dr. Diez was issued a 5-year permit... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA382 Endangered...

  18. 77 FR 55194 - Endangered Species; File No. 17095

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    .... The requested permit has been issued under the authority of the Endangered Species Act of 1973, as... of endangered and threatened species (50 CFR parts 222-226). The Permit Holder is issued a five-year... operate to the disadvantage of such endangered or threatened species, and (3) is consistent with the...

  19. 50 CFR 648.164 - Possession restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Atlantic Bluefish Fishery § 648.164 Possession restrictions. (a) No person shall possess more than 15 bluefish in, or harvested from, the EEZ unless that person is the owner or operator of a fishing vessel issued a bluefish commercial permit or is issued a bluefish dealer permit. Persons aboard a vessel that...

  20. 33 CFR 320.2 - Authorities to issue permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....2 Section 320.2 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE GENERAL REGULATORY POLICIES § 320.2 Authorities to issue permits. (a) Section 9 of the... causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of...

  1. 33 CFR 320.2 - Authorities to issue permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....2 Section 320.2 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE GENERAL REGULATORY POLICIES § 320.2 Authorities to issue permits. (a) Section 9 of the... causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of...

  2. 33 CFR 320.2 - Authorities to issue permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....2 Section 320.2 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE GENERAL REGULATORY POLICIES § 320.2 Authorities to issue permits. (a) Section 9 of the... causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of...

  3. 33 CFR 320.2 - Authorities to issue permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....2 Section 320.2 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE GENERAL REGULATORY POLICIES § 320.2 Authorities to issue permits. (a) Section 9 of the... causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of...

  4. 33 CFR 320.2 - Authorities to issue permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....2 Section 320.2 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE GENERAL REGULATORY POLICIES § 320.2 Authorities to issue permits. (a) Section 9 of the... causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of...

  5. 77 FR 12010 - Marine Mammals; File Nos. 1076-1789 and 14502

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... Mammals; File Nos. 1076-1789 and 14502 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... 80208, have been issued minor amendments to Scientific Research Permit Nos. 1076-1789 and 14502.... 1076-1789: This permit, issued on March 13, 2007 (72 FR 13092), authorized the receipt, import and...

  6. 22 CFR 1104.9 - Suspension and revocation of permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... continuation of work under the permit would be in conflict with management requirements not in effect when the permit was issued. The Commissioner shall provide written notice to the permittee stating the nature of...

  7. NPDES Permit: Shiprock Wastewater Treatment Facility, Shiprock, New Mexico

    EPA Pesticide Factsheets

    NPDES Permit, Fact Sheet, and Response to Comments explaining EPA's issue of NPDES Permit No. NN0020621 to the Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility, Shiprock, San Juan County, New Mexico.

  8. 43 CFR 2932.26 - How will BLM decide whether to issue a Special Recreation Permit?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) PERMITS FOR RECREATION ON PUBLIC LANDS Special Recreation Permits for Commercial Use, Competitive Events...

  9. 30 CFR 912.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO... without permits issued and/or certificates required by the State of Idaho, pursuant to Idaho Code sections...

  10. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  11. 76 FR 9611 - Notice of Permit Modification Request Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Request Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification request... that the National Science Foundation (NSF) has received a request to modify a permit issued to conduct...

  12. 14 CFR 21.197 - Special flight permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Special flight permits. 21.197 Section 21... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Airworthiness Certificates § 21.197 Special flight permits. (a) A special flight permit may be issued for an aircraft that may not currently meet applicable...

  13. 14 CFR 21.197 - Special flight permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Special flight permits. 21.197 Section 21... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Airworthiness Certificates § 21.197 Special flight permits. (a) A special flight permit may be issued for an aircraft that may not currently meet applicable...

  14. 14 CFR 21.197 - Special flight permits.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Special flight permits. 21.197 Section 21... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Airworthiness Certificates § 21.197 Special flight permits. (a) A special flight permit may be issued for an aircraft that may not currently meet applicable...

  15. 78 FR 49258 - Fisheries in the Western Pacific; Special Coral Reef Ecosystem Fishing Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... the Western Pacific; Special Coral Reef Ecosystem Fishing Permit AGENCY: National Marine Fisheries... Reef Ecosystem Fishing Permit that would authorize Kampachi Farms, LLC, to culture and harvest a coral...: NMFS proposes to issue a Special Coral Reef Ecosystem Fishing Permit to Kampachi Farms, LLC, consistent...

  16. 78 FR 66683 - Fisheries in the Western Pacific; Special Coral Reef Ecosystem Fishing Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... the Western Pacific; Special Coral Reef Ecosystem Fishing Permit AGENCY: National Marine Fisheries... special coral reef ecosystem fishing permit. SUMMARY: NMFS issued a Special Coral Reef Ecosystem Fishing Permit that authorizes Kampachi Farms, LLC, to culture and harvest a coral reef ecosystem management unit...

  17. 7 CFR 301.85-4 - Issuance and cancellation of certificates and permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Nematode Quarantine and Regulations § 301.85-4 Issuance and cancellation of certificates and permits. (a... result in the spread of the golden nematode and requirements of other applicable Federal domestic plant... golden nematode. (e) Certificate, limited permit, and restricted destination permit forms may be issued...

  18. 7 CFR 301.85-4 - Issuance and cancellation of certificates and permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Nematode Quarantine and Regulations § 301.85-4 Issuance and cancellation of certificates and permits. (a... result in the spread of the golden nematode and requirements of other applicable Federal domestic plant... golden nematode. (e) Certificate, limited permit, and restricted destination permit forms may be issued...

  19. 7 CFR 301.85-4 - Issuance and cancellation of certificates and permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Nematode Quarantine and Regulations § 301.85-4 Issuance and cancellation of certificates and permits. (a... result in the spread of the golden nematode and requirements of other applicable Federal domestic plant... golden nematode. (e) Certificate, limited permit, and restricted destination permit forms may be issued...

  20. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 2 2010-10-01 2010-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...

  1. 50 CFR 17.63 - Economic hardship permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 2 2010-10-01 2010-10-01 false Economic hardship permits. 17.63 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... issuance criteria of this section, in order to prevent undue economic hardship. No such exemption may be...

  2. 77 FR 41167 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... research permits. SUMMARY: Notice is hereby given that NMFS has issued Permit 16110 to Marin Municipal Water District and Permit 15730 to Salmon Protection and Watershed Network. ADDRESSES: The approved... receipt of an application for a scientific research permit renewal (16110) was published in the Federal...

  3. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 2 2011-10-01 2011-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...

  4. 50 CFR 17.63 - Economic hardship permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 2 2013-10-01 2013-10-01 false Economic hardship permits. 17.63 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... issuance criteria of this section, in order to prevent undue economic hardship. No such exemption may be...

  5. 50 CFR 17.63 - Economic hardship permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 2 2012-10-01 2012-10-01 false Economic hardship permits. 17.63 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... issuance criteria of this section, in order to prevent undue economic hardship. No such exemption may be...

  6. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 2 2013-10-01 2013-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...

  7. 50 CFR 17.63 - Economic hardship permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 2 2011-10-01 2011-10-01 false Economic hardship permits. 17.63 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... issuance criteria of this section, in order to prevent undue economic hardship. No such exemption may be...

  8. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 2 2014-10-01 2014-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...

  9. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 2 2012-10-01 2012-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...

  10. 50 CFR 17.63 - Economic hardship permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 2 2014-10-01 2014-10-01 false Economic hardship permits. 17.63 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... issuance criteria of this section, in order to prevent undue economic hardship. No such exemption may be...

  11. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  12. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  13. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  14. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  15. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  16. 50 CFR 635.32 - Specifically authorized activities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to fish for, take, retain, or possess Atlantic sharks, including sandbar sharks, in excess of the... permit, display permit, chartering permit, or shark research permit issued in response to requests for... landed or retained under the authority of this section is subject to a quota, the fish shall be counted...

  17. 50 CFR 635.32 - Specifically authorized activities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to fish for, take, retain, or possess Atlantic sharks, including sandbar sharks, in excess of the... permit, display permit, chartering permit, or shark research permit issued in response to requests for... landed or retained under the authority of this section is subject to a quota, the fish shall be counted...

  18. Letter in Response to Issues Raised by CAPCOA and Others Concerning the Requirements for Implementing an Operating Permits Program

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. Next Steps for Addressing EPA-Issued Step 2 Prevention of Significant Deterioration Greenhouse Gas Permits and Associated Requiremnts

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 76 FR 10894 - Notice of Issuance of Prevention of Significant Deterioration and Federal Operating Permits to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... (EPA). ACTION: Notice. SUMMARY: This notice announces that, on December 30, 2010, pursuant to title V of the Clean Air Act, EPA issued a title V Permit to Operate (title V permit) to the Mille Lacs Band... permits, which ended April 5, 2010, EPA received comments on the draft title V permit, and revised the...

  1. 77 FR 16836 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... operating permit (Permit Number P062R2) issued by the New Mexico Environment Department, Air Quality Bureau... Objection to State Operating Permit for Public Service Company of New Mexico, San Juan Generating Station... Mexico, for the operations of the San Juan Generating Station (SJGS) located in San Juan County, New...

  2. 40 CFR 124.15 - Issuance and effective date of permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Administrator shall issue a final permit decision (or a decision to deny a permit for the active life of a RCRA... final permit decision (or a decision to deny a permit for the active life of a RCRA hazardous waste... decision unless: (1) A later effective date is specified in the decision; or (2) Review is requested on the...

  3. 40 CFR 124.15 - Issuance and effective date of permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator shall issue a final permit decision (or a decision to deny a permit for the active life of a RCRA... final permit decision (or a decision to deny a permit for the active life of a RCRA hazardous waste... decision unless: (1) A later effective date is specified in the decision; or (2) Review is requested on the...

  4. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  5. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  6. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  7. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  8. 43 CFR 7.10 - Suspension and revocation of permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... permit would be in conflict with management requirements not in effect when the permit was issued. The Federal land manager shall provide written notice to the permittee stating the nature of and basis for the...

  9. General Permits for Ocean Dumping

    EPA Pesticide Factsheets

    General permits are issued by EPA for the ocean dumping of certain materials that will have a minimal adverse environmental impact and are generally disposed of in small quantities. Information includes examples and ocean disposal sites for general permits

  10. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  11. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    PubMed

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  12. Mining Permits - Division of Mining, Land, and Water

    Science.gov Websites

    are issued for a term of 1-5 years. An application for a "single year" operation costs $150 ). Federal Operators: If your operation involves federal land managed by the Bureau of Land Management (BLM issues miners the Alaska Pollutant Discharge Elimination System (APDES) General Permit. If the operation

  13. 8 CFR 212.1 - Documentary requirements for nonimmigrants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Cards and a valid Taiwan passport with a valid re-entry permit issued by the Taiwan Ministry of Foreign... valid re-entry permit issued by the Taiwan Ministry of Foreign Affairs. (2) Program Countries and... the United States from contiguous territory or adjacent islands at a land or sea port-of-entry. A...

  14. 8 CFR 212.1 - Documentary requirements for nonimmigrants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Cards and a valid Taiwan passport with a valid re-entry permit issued by the Taiwan Ministry of Foreign... Taiwan National Identity Card and a valid Taiwan passport with a valid re-entry permit issued by the... the United States from contiguous territory or adjacent islands at a land or sea port-of-entry. A...

  15. 8 CFR 212.1 - Documentary requirements for nonimmigrants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Cards and a valid Taiwan passport with a valid re-entry permit issued by the Taiwan Ministry of Foreign... Taiwan National Identity Card and a valid Taiwan passport with a valid re-entry permit issued by the... the United States from contiguous territory or adjacent islands at a land or sea port-of-entry. A...

  16. 8 CFR 212.1 - Documentary requirements for nonimmigrants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Cards and a valid Taiwan passport with a valid re-entry permit issued by the Taiwan Ministry of Foreign... Taiwan National Identity Card and a valid Taiwan passport with a valid re-entry permit issued by the... the United States from contiguous territory or adjacent islands at a land or sea port-of-entry. A...

  17. 36 CFR 13.932 - How many permits will be issued each summer?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and...

  18. 36 CFR 13.932 - How many permits will be issued each summer?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and...

  19. 36 CFR 13.932 - How many permits will be issued each summer?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and...

  20. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  1. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  2. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  3. 40 CFR 68.85 - Hot work permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  4. 78 FR 25435 - Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Municipal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... (NPDES) General Permit for Municipal Separate Storm Sewer Systems in the Middle Rio Grande Watershed in... Elimination System (NPDES) general permit for storm water discharges from municipal separate storm sewer... issued for various categories of storm water discharges. Section 402(p)(2) requires permits for five...

  5. 50 CFR 665.663 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., possess or land PRIA precious coral MUS in any precious coral permit area, unless a permit has been issued..., take, or retain any species of PRIA precious coral MUS in any precious coral permit area: (1) By means... retain, possess, or land any live pink coral or live black coral from any precious coral permit area that...

  6. 50 CFR 665.663 - Prohibitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., possess or land PRIA precious coral MUS in any precious coral permit area, unless a permit has been issued..., take, or retain any species of PRIA precious coral MUS in any precious coral permit area: (1) By means... retain, possess, or land any live pink coral or live black coral from any precious coral permit area that...

  7. 50 CFR 665.163 - Prohibitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... precious coral in any precious coral permit area, unless a permit has been issued for that vessel and area... species of American Samoa precious coral MUS in any precious coral permit area: (1) By means of gear or... land any live pink coral or live black coral from any precious coral permit area that is less than the...

  8. 50 CFR 665.163 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... precious coral in any precious coral permit area, unless a permit has been issued for that vessel and area... species of American Samoa precious coral MUS in any precious coral permit area: (1) By means of gear or... land any live pink coral or live black coral from any precious coral permit area that is less than the...

  9. 50 CFR 665.163 - Prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... precious coral in any precious coral permit area, unless a permit has been issued for that vessel and area... species of American Samoa precious coral MUS in any precious coral permit area: (1) By means of gear or... land any live pink coral or live black coral from any precious coral permit area that is less than the...

  10. 50 CFR 665.163 - Prohibitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... precious coral in any precious coral permit area, unless a permit has been issued for that vessel and area... species of American Samoa precious coral MUS in any precious coral permit area: (1) By means of gear or... land any live pink coral or live black coral from any precious coral permit area that is less than the...

  11. 50 CFR 665.163 - Prohibitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... precious coral in any precious coral permit area, unless a permit has been issued for that vessel and area... species of American Samoa precious coral MUS in any precious coral permit area: (1) By means of gear or... land any live pink coral or live black coral from any precious coral permit area that is less than the...

  12. 50 CFR 665.663 - Prohibitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., possess or land PRIA precious coral MUS in any precious coral permit area, unless a permit has been issued..., take, or retain any species of PRIA precious coral MUS in any precious coral permit area: (1) By means... retain, possess, or land any live pink coral or live black coral from any precious coral permit area that...

  13. 50 CFR 665.663 - Prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., possess or land PRIA precious coral MUS in any precious coral permit area, unless a permit has been issued..., take, or retain any species of PRIA precious coral MUS in any precious coral permit area: (1) By means... retain, possess, or land any live pink coral or live black coral from any precious coral permit area that...

  14. 50 CFR 665.663 - Prohibitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., possess or land PRIA precious coral MUS in any precious coral permit area, unless a permit has been issued..., take, or retain any species of PRIA precious coral MUS in any precious coral permit area: (1) By means... retain, possess, or land any live pink coral or live black coral from any precious coral permit area that...

  15. 76 FR 27016 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... and Threatened Species; Take of Anadromous Fish AGENCY: National Marine Fisheries Service (NMFS... governing listed fish and wildlife permits (50 CFR 222-226). NMFS issues permits based on findings that such... Received Permit 15611 The Washington Department of Fish and Wildlife (WDFW) is seeking a 5-year permit to...

  16. 43 CFR 4130.5 - Free-use grazing permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Free-use grazing permits. 4130.5 Section... MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) GRAZING ADMINISTRATION-EXCLUSIVE OF ALASKA Authorizing Grazing Use § 4130.5 Free-use grazing permits. (a) A free-use grazing permit shall be issued to...

  17. 43 CFR 4130.5 - Free-use grazing permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Free-use grazing permits. 4130.5 Section... MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) GRAZING ADMINISTRATION-EXCLUSIVE OF ALASKA Authorizing Grazing Use § 4130.5 Free-use grazing permits. (a) A free-use grazing permit shall be issued to...

  18. 43 CFR 4130.5 - Free-use grazing permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Free-use grazing permits. 4130.5 Section... MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) GRAZING ADMINISTRATION-EXCLUSIVE OF ALASKA Authorizing Grazing Use § 4130.5 Free-use grazing permits. (a) A free-use grazing permit shall be issued to...

  19. 43 CFR 4130.5 - Free-use grazing permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Free-use grazing permits. 4130.5 Section... MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) GRAZING ADMINISTRATION-EXCLUSIVE OF ALASKA Authorizing Grazing Use § 4130.5 Free-use grazing permits. (a) A free-use grazing permit shall be issued to...

  20. 76 FR 9772 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ...) permit program to allow the State to issue research, development, and demonstration (RD&D) permits for... environment. The Director may provide a variance from existing requirements of MSWLF criteria for run-on... demonstrate that compliance with the RD&D permit will not increase risk to human heath and the environment...

Top