Sample records for construction permits

  1. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  2. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  3. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  4. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  5. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  6. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  7. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  8. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  9. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  10. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  11. 76 FR 80366 - Availability of an Environmental Assessment (EA) and Finding of No Significant Impact (FONSI)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...

  12. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  13. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... (NPDES) general permits for stormwater discharges associated with construction activity in order to... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  14. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...

  15. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  16. 76 FR 60830 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...

  17. 78 FR 72081 - Closed Auction of AM Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...

  18. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  19. EPA's Draft 2017 Construction General Permit (CGP)

    EPA Pesticide Factsheets

    EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.

  20. 75 FR 4554 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' The 2008 CGP...

  1. 78 FR 28547 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... each construction permit exemption claim. WDNR held public hearings on June 27, 28 and 29, 2006, for... required to respond to the construction permit exemption claim submitted. NR 406.04(1q)(1) and (5) for... pollution from construction permit requirements. EPA is proposing to approve these revisions because they...

  2. 75 FR 61752 - Auction of FM Broadcast Construction Permits Scheduled for March 29, 2011; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...

  3. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  4. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  5. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  6. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  7. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  8. 40 CFR 49.155 - Permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...

  9. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  10. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  11. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  12. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  13. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  14. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...

  15. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  16. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  17. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  18. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  19. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  20. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  1. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  2. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  3. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  4. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  5. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  6. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  7. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  8. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  9. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  10. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  11. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  12. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  13. Evaluating the effectiveness of best management practices and green infrastructure in the State of California

    EPA Science Inventory

    Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...

  14. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  15. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  16. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  17. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  18. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  19. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  20. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  1. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  2. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  3. 46 CFR 287.7 - Circumstances permitting reimbursement from a construction reserve fund.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Circumstances permitting reimbursement from a... Circumstances permitting reimbursement from a construction reserve fund. (a) Payments prior to establishment of... this part, draw against such fund as reimbursement for the amount, if any, of other funds which, with...

  4. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  5. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  6. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  7. 25 CFR 166.316 - Can a permittee construct improvements on permitted Indian land?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a permittee construct improvements on permitted Indian land? 166.316 Section 166.316 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation Practices and Improvements § 166...

  8. 78 FR 40968 - Notice of Extension of Deadline to Commence Construction Under Clean Air Act Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...

  9. 77 FR 16853 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... construction of a commercial development, and seeks a 5-year permit. The 7.7-ac project is located on parcel 09... project includes construction of a commercial development and the associated infrastructure, and...

  10. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  11. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  12. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  13. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  14. 76 FR 24874 - Initiation of Scoping for an Environmental Assessment (EA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ...) General Permit for Discharges from Construction Activities. The EA will evaluate the potential environmental impacts from the discharge of pollutants associated with stormwater runoff from construction... days of the date of the publication of the Proposed Construction General Permit in the Federal Register...

  15. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  16. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  17. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  18. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  19. 25 CFR 166.317 - What happens to improvements constructed on Indian lands when the permit has been terminated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to improvements constructed on Indian lands when the permit has been terminated? 166.317 Section 166.317 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation...

  20. 78 FR 63489 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    .... Herrington, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE15414B-0... construction of commercial developments, and they seek a 10-year permit. The 7.81-ac project is located on... East, Lake County, Florida. The project includes construction of a commercial development and the...

  1. Polynomial Conjoint Analysis of Similarities: A Model for Constructing Polynomial Conjoint Measurement Algorithms.

    ERIC Educational Resources Information Center

    Young, Forrest W.

    A model permitting construction of algorithms for the polynomial conjoint analysis of similarities is presented. This model, which is based on concepts used in nonmetric scaling, permits one to obtain the best approximate solution. The concepts used to construct nonmetric scaling algorithms are reviewed. Finally, examples of algorithmic models for…

  2. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  3. 77 FR 47065 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...

  4. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  5. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  6. 47 CFR 1.2003 - Applications affected.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...

  7. Mississippi SIP: Title 11, Part 2, Chapter 2 - Permit Regulations for the Construction and/or Operation of Air Emissions Equipment

    EPA Pesticide Factsheets

    Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations

  8. 47 CFR 73.3500 - Application and report forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...

  9. Iowa SIP: Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

    EPA Pesticide Factsheets

    EPA Approved Iowa Regulations - 40 CFR 52.820(c) Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

  10. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  11. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  12. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...

  13. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  14. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  15. 40 CFR 71.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...

  16. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  17. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  18. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  19. FNF Construction, Inc. Coverage under General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country

    EPA Pesticide Factsheets

    Documents related to the FNF Construction, Inc. Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country to be Located near Ganado, Arizona on the Navajo Nation.

  20. 77 FR 18923 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...

  1. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... permit program for pre- construction review of certain new and modified major stationary sources in... program as required by section 165 of the CAA for certain new and modified major stationary sources... the CAA requires states to adopt a pre-construction permitting program for certain new and modified...

  2. 76 FR 9809 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE35022A-0, U.S. Fish and... ac of occupied Florida scrub-jay foraging and sheltering habitat incidental to construction of a... construction of a commercial center and the associated infrastructure, and landscaping. The applicant proposes...

  3. 47 CFR 74.112 - Supplementary statement with application for construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction permit for any experimental broadcast station confirming the applicant's understanding: (a) That... notice or hearing. (e) That any authorization issued pursuant to the application may be cancelled at any time without notice or hearing, and will expire as a matter of law if the station fails to transmit...

  4. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  5. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  6. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  7. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  8. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  9. 40 CFR 52.681 - Permits to construct and tier II operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...

  10. 77 FR 42488 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Panoche Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...

  11. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...

  12. FNF Construction Inc. Window Rock Airport Project: Coverage Under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country

    EPA Pesticide Factsheets

    Approved Request for Coverage under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country for FNF Construction Inc. Window Rock Airport Soil Cement Mixing Plant Project, Beacon Road, Window Rock, Arizona 86515.

  13. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  14. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  15. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  16. 76 FR 40725 - Approval of Outer Continental Shelf (OCS) Permit Issued to Cape Wind Associates, LLC (EPA Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...

  17. An examination of the Virginia Department of Transportation's 404 general permit program.

    DOT National Transportation Integrated Search

    1988-01-01

    Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. A...

  18. 75 FR 22434 - Exelon Nuclear Texas Holdings, LLC; Notice of Receipt and Availability of Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...

  19. 75 FR 68821 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...- megawatt (MW), 21-turbine Kaheawa Wind Power I (KWP I) project. Like KWP II, KWP I is owned by First Wind... wind turbine structures. The Hawaiian petrel and Newell's shearwater breed on Maui and feed in the open... the permit include the construction and operation of a new 21-megawatt, 14-turbine wind energy...

  20. 77 FR 16082 - In the Matter of All Power Reactor Licensees and Holders of Construction Permits in Active Or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ...) I The Licensees and construction permit (CP) holders\\1\\ identified in Attachment 1 to this Order... identified in Attachment 1 to this Order (i.e., Watts Bar, Unit 2; and Bellefonte, Units 1 and 2) [[Page... boiled dry, resulting in fuel damage.\\2\\ Fukushima demonstrated the confusion and misapplication of...

  1. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  2. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  3. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  4. 77 FR 27054 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Offshore, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...

  5. 76 FR 55799 - Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to Avenal Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...

  6. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  7. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  8. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  9. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  10. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  11. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  12. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  13. 78 FR 46520 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2008-0402; FRL-9834-4] Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule AGENCY: Environmental.... WDNR submitted revisions exempting certain sources of air pollution from construction permit...

  14. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  15. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  16. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  17. 77 FR 64237 - Notice of Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...

  18. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  19. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Digital construction period. 74.788 Section 74... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  20. Plant centromere compositions

    DOEpatents

    Mach, Jennifer M [Chicago, IL; Zieler, Helge [Del Mar, CA; Jin, RongGuan [Chesterfield, MO; Keith, Kevin [Three Forks, MT; Copenhaver, Gregory P [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2011-08-02

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  1. Plant centromere compositions

    DOEpatents

    Mach,; Jennifer M. , Zieler; Helge, Jin [Del Mar, CA; RongGuan, Keith [Chesterfield, MO; Kevin, Copenhaver [Three Forks, MT; Gregory P. , Preuss; Daphne, [Chicago, IL

    2011-11-22

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  2. Plant centromere compositions

    DOEpatents

    Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2006-10-10

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  3. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, James [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2006-06-26

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  4. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, RongGuan [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2007-06-05

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  5. 77 FR 28491 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected]gov . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  6. 77 FR 34808 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected] . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  7. 75 FR 82246 - Action To Ensure Authority To Issue Permits Under the Prevention of Significant Deterioration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Deterioration (PSD) program to sources of greenhouse gases (GHGs). This action will ensure that a permitting authority--EPA--is available in these states as of January 2, 2011, when PSD becomes applicable to GHG-emitting sources, to issue preconstruction PSD permits and thereby facilitate construction or expansion...

  8. 76 FR 56982 - Approval and Promulgation of Implementation Plans; Texas; Revisions to Permits by Rule and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Pollution by Permits for New Construction or Modification AGENCY: Environmental Protection Agency (EPA... in Title 30 of the Texas Administrative Code (TAC), Chapter 116--Control of Air Pollution by Permits... [email protected] . List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  9. 33 CFR 321.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of applications for Department of the Army (DA) permits to authorize the construction of a dike or... require DA permits under section 404 of the Clean Water Act, as amended (33 U.S.C. 1344). Applicants for DA permits under this part should also refer to 33 CFR part 323 to satisfy the requirements of...

  10. Oil and Gas Stormwater Permitting Documents

    EPA Pesticide Factsheets

    This final rule exempts construction activities at oil and gas sites from the requirement to obtain an NPDES permit for stormwater discharges except in very limited instances. This rule is effective June 12, 2006.

  11. 77 FR 34897 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit to Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0394, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  12. 77 FR 28543 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ...-0292, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  13. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  14. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  15. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  16. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  17. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  18. Synthetic Minor NSR Permit: Arrow Pipeline, LLC - Station #7

    EPA Pesticide Factsheets

    This page contains the administratively revised synthetic minor permit to construct for the Arrow Pipeline, LLC, Station #7, located within the exterior boundaries of the Fort Berthold Indian Reservation in Dunn County, North Dakota.

  19. 75 FR 68215 - Direct Final Rule Staying Numeric Limitation for the Construction and Development Point Source...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... required to obtain NPDES permit coverage and performing the following activities: Construction of buildings, including building, developing and general contracting. Heavy and civil 237 engineering construction... Rule Staying Numeric Limitation for the Construction and Development Point Source Category AGENCY...

  20. Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7

    DTIC Science & Technology

    1989-10-23

    817) 824-5606. Reelfoot Lake Water Level believes that the proposed timber EIS No. 890197. Final, USA. UT, Tooele Management Plan. Implementation...2: Incidenial lake erit The potential need for an incidental take permit is discussed in Section 4.4.1, Regional Environment. Comment No. 3...and Crow Indian Tribes. Yellowstone, E02, Lake Catamount ResortAvailability Big Horn and Rosebud Counties, MT, Construction. Special Use Permit

  1. 77 FR 68197 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... emergent, scrub-shrub and forested wetlands. Subject to the permit conditions, INDOT is permitted to... emergent, scrub-shrub, and forested wetlands in constructing these 18 crossings. The actions by the Federal...

  2. 40 CFR 60.1705 - What emission limits must I meet? By when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... modification after June 26, 1987, then you must comply with the dioxins/furans and mercury emission limits... construction or operating permit, if a permit modification is required. Final compliance with the dioxins...

  3. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  4. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  5. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  6. Lift-Shape Construction, An EFL Project Report.

    ERIC Educational Resources Information Center

    Evans, Ben H.

    Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…

  7. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  8. Documents related to Proposed Class II injection well permit modification MI-147-2D-0014

    EPA Pesticide Factsheets

    Public notice for proposed modification of permit number MI-147-2D-0014 (St. Clair County, MI). The proposed modification would change the injection zone, the construction, and reduce the injection pressure.

  9. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Heavy and Civil Engineering 237 Construction. EPA does not intend the preceding table to be exhaustive... challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may...

  10. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  11. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  12. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  13. Development of uniform standards for allowable lane closure : final report, September 2008.

    DOT National Transportation Integrated Search

    2008-09-01

    Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...

  14. NPDES Permit for Denver Federal Center Building 52A in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034860, the GSA is authorized to discharge wastewater from construction dewatering activities at Denver Federal Center Building 52A in Lakewood, Colo., to to the storm drain system entering McIntyre Gulch.

  15. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  16. 76 FR 12693 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ....S. Census Bureau. Title: Survey of Construction--Questionnaire for Building Permit Official. OMB... Construction (SOC). Government agencies and private companies use statistics from SOC to monitor and evaluate the large and dynamic housing construction industry. The SOC-QBPO is an electronic questionnaire...

  17. 78 FR 23327 - Issuance of a Presidential Permit Authorizing the State of Michigan to Construct, Connect...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ...) The construction, operation and maintenance of the United States facilities shall be in all material... ``Application''). Article 2. (1) The standards for, and the manner of, the construction, operation, and... performance of their official duties. (2) Prior to initiation of construction, the permittee shall obtain the...

  18. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  19. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  20. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  1. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  2. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  3. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  4. Minor New Source Review Permit Application: Fluidic, Inc.

    EPA Pesticide Factsheets

    Federal Minor New Source Review New Construction Application for proposed construction of new equipment at an existing source at Fluidic's facility located at 8425 N. 9th Street, Suite #4, Scottsdale, Arizona 48258.

  5. Majestic C Team, LLC - Clean Water Act Public Notice

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Majestic C Team, LLC., which owns a residential construction site located at 168th St and State St in Omaha, NE for alleged violations of its NPDES permit (permit No. NER11

  6. 33 CFR 114.05 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (h) Permit. The term “permit” means the license permitting construction of bridges and approaches... subchapter. (i) Secretary. The term “Secretary” means the Secretary of Homeland Security or any person to... term “bridge” means a structure erected across navigable waters of the United States, and includes...

  7. 75 FR 33653 - Exelon Nuclear Texas Holdings, LLC (Exelon) Acceptance for Docketing of an Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ... of 10 CFR Part 52 separate from the filing of an application for a construction permit (CP) or... reference the permit in a CP or COL application. The NRC staff has determined that Exelon has submitted...

  8. Construction Activities Prior to Issuance of a PSD Permit with Respect to Begin Actual Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  10. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  11. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  12. 40 CFR 70.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  13. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  14. 36 CFR 223.37 - Revegetation of temporary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... roads. 223.37 Section 223.37 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... Provisions § 223.37 Revegetation of temporary roads. Timber sale contracts, permits and other documents... roads constructed or used thereunder so as to permit the reestablishment by artificial or natural means...

  15. 10 CFR 50.37 - Agreement limiting access to Classified Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...

  16. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  17. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  18. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  19. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  20. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  1. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  2. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  3. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  4. 75 FR 4839 - Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...] Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL AGENCY: Fish and Wildlife Service...-jay) breeding, feeding, and sheltering habitat incidental to lot preparation for the construction of a...)) of Florida scrub-jay breeding, feeding and sheltering habitat incidental to land preparation for...

  5. 75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... constructed in Franklin, New Hampshire. At the Franklin converter terminal the electric energy would be... marketplace, DOE has consistently expressed its policy that cross-border trade in electric energy should be... DEPARTMENT OF ENERGY [OE Docket No. PP-371] Application for Presidential Permit; Northern Pass...

  6. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  7. Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations

    DOT National Transportation Integrated Search

    2018-01-01

    Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...

  8. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    EPA Pesticide Factsheets

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  9. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...

  10. 75 FR 20653 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed TransCanada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Presidential permit for the construction, operation, and maintenance of pipeline facilities at the border of... referred to in Executive Order 13337, as amended, for the construction, connection, operation, or... environmental effects of the construction and operation of the United States portion of the Keystone XL Pipeline...

  11. Constructing temporary sampling platforms for hydrologic studies

    Treesearch

    Manuel H. Martinez; Sandra E. Ryan

    2000-01-01

    This paper presents instructions for constructing platforms that span the width of stream channels to accommodate the measurement of hydrologic parameters over a wide range of discharges. The platforms provide a stable, safe, noninvasive, easily constructed, and relatively inexpensive means for permitting data collection without wading in the flow. We have used the...

  12. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...

  13. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  14. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  15. United States housing, first quarter 2013

    Treesearch

    Delton Alderman

    2014-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.

  16. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  17. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  18. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  19. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  20. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  1. 76 FR 35431 - Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ...: Table 1--Entities Potentially Regulated by This Permit North American Examples of affected Industry... intend the preceding table to be exhaustive, but provides it as a guide for readers regarding entities.../wastetech/guide/construction/index.cfm . B. Extension of Comment Period EPA is extending the deadline for...

  2. 10 CFR 50.36b - Environmental conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Environmental conditions. 50.36b Section 50.36b Energy... § 50.36b Environmental conditions. (a) Each construction permit under this part, each early site permit... conditions will be derived from information contained in the environmental report submitted pursuant to § 51...

  3. 43 CFR 3212.22 - What criteria establish a new facility for the purpose of obtaining a production incentive?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Lease Suspensions, Cessation of Production, Royalty Rate Reductions, and Energy Policy Act Royalty Rate Conversions § 3212.22 What criteria establish a new... not: (1) Be permitted only with a Geothermal Drilling Permit; (2) Be constructed entirely within the...

  4. 78 FR 67336 - Habitat Conservation Plan for the United Water Conservation District, Santa Clara River Watershed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... incidental take permits for United's construction, operations, and maintenance of water management facilities... maintenance of the Freeman Diversion; diversion of water from the Santa Clara River; vegetation management... current and future water management activities. United intends to request a 50-year permit covering five...

  5. 76 FR 76713 - Agency Information Collection Activities; Proposed Collections; Comment Request; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... review programs for new or modified stationary sources of air pollution. In addition, the provisions of... the emissions from the construction and modification of any stationary source of air pollution to... Flexible Air Permitting Rule also slightly reduced the burden per minor NSR permit. As a result of all...

  6. 78 FR 27196 - Modification of Permit Application and Intent for Additional Public Scoping for an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... simulations. Final channel design and associated environmental impacts will be addressed during the permitting and EIS process. The EIS will evaluate the effects of construction and long term effects of the... in the EIS process; announce the plans for an additional public scoping meeting; solicit public...

  7. 40 CFR 52.1384 - Emission control regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction permit to override a requirement that has been approved as part of the SIP, are disapproved. We cannot approve these provisions into the SIP, as it would allow the State to change a SIP requirement through the issuance of a permit. Pursuant to section 110 of the Act, to change a requirement of the SIP...

  8. A Phloem Sandwich Unit for Observing Bark Beetles, Associated Predators, and Parasites

    Treesearch

    Donald N. Kim; Mitchel C. Miller

    1981-01-01

    This paper describes a phloem sandwich that allows observation of parent beetles, their brood, and associates within the inner bark, and permits observation of predator and parasite behavior on the bark surface. The construction of the unit permits the introduction of multiple pairs of beetles into a single sandwich.

  9. 29 CFR 1926.152 - Flammable liquids.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner to... feet of each portable tank, there shall be a 12-foot-wide access way to permit approach of fire control... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top...

  10. 75 FR 61577 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... workers certified in the top five industries were as follows: Construction--30,242; Amusement, Gambling... employment in each of these industries: Construction--0.4 percent (30,242/7,265,648); Amusement, Gambling... permitted each year: Construction--0.2 percent (14,756/7,265,648); Amusement, Gambling, and Recreation--0.5...

  11. United States housing, fourth quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarter’s end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...

  12. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator of the Environmental Protection Agency (“EPA”) conditionally exempts electric generating units on... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... to be constructed at Orote, with the following conditions: (i) Each electric generating unit shall...

  13. 75 FR 65646 - Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... II of the Lompoc Wind Energy Project would involve the construction and operation of wind turbines... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-ES-2010-N235; 1112-0000-81440-F2] Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA AGENCY: U.S. Fish and...

  14. 75 FR 64863 - Prevention of Significant Deterioration (PSD) for Particulate Matter Less Than 2.5 Micrometers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... permit applicant's burden and streamline the permitting process for de minimis circumstances. These tools... pollutant is de minimis. An emission increase for a particular pollutant that is greater than the SER... construct, is less than the SMC, i.e., de minimis, and may be allowed to forego the preconstruction...

  15. 78 FR 52965 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ...-FF04EF2000] Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit... 1.49 acres of foraging, breeding, and sheltering habitat used by the Florida scrub-jay (Aphelocoma... taking 1.49 acre of Florida scrub-jay breeding, feeding, and sheltering habitat for construction of a...

  16. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...

  17. 78 FR 16565 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) and To Conduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Permits for the construction, connection, operation, or maintenance at the borders of the United States... Department for an amendment to their current Presidential Permit authorizing it to operate at a higher... address current and future demand by U.S. and Canada refineries for supplies of heavy crude oil from the...

  18. 77 FR 65305 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... incorporates District Rule 2410-- Prevention of Significant Deterioration (PSD)--into the California SIP to establish a PSD permit program for pre-construction review of certain new and modified major stationary... provides an adequate PSD permitting program as required by section 110 and part C of title I of the CAA...

  19. 78 FR 58270 - Cleveland National Forest, California, SDG&E Master Special Use Permit and Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ..., while providing for the operation and maintenance of the SDG&E electric powerline system. The project... communities, residents, businesses, and government owned facilities located within and adjacent to the... managed by the Bureau of Land Management (BLM); tribal lands of the La Jolla, Campo, Inaja, and Viejas...

  20. There and Back Again: An Acquisition Study

    ERIC Educational Resources Information Center

    Xu, Ting; Snyder, William

    2017-01-01

    When "again" modifies an English goal-PP construction, the sentence is ambiguous between a repetitive and a restitutive reading. Interestingly, languages vary in whether their counterpart to English "again" permits a restitutive reading with goal-PP constructions (Beck 2005; Beck & Snyder 2001). This article explores how…

  1. 7 CFR 1740.9 - Grant application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorized the initiation of digital broadcasting at the project sites. In the event that an FCC construction... advance of funds for that site conditional upon the submission of a construction permit. (j) Compliance... Digital Transition,” and must include the Environmental Questionnaire/Certification, available from RUS...

  2. [A gearing mechanism with 4 degrees of freedom for robotic applications in medicine].

    PubMed

    Pott, P; Weiser, P; Scharf, H P; Schwarz, M

    2004-06-01

    Applications in robot-aided surgery are currently based on modifications of manipulators used in industrial manufacturing processes. In this paper we describe novel rotatory kinematics for a manipulator, specially developed for deployment in robot-aided surgery. The construction of the gearing mechanism used for the positioning and orientation of a linkage point is described. Forward and inverse kinematics were calculated, and a constructive solution proposed. The gearing mechanism is based on two disk systems, each of which consists of two opposing rotatable discs. The construction was designed in such a way that the linkage point can be positioned freely anywhere within the mechanism's range of motion. The kinematics thus permits an x-y-positioning via rotating movements only. The spatial arrangement of two of such disc systems permits movements in four degrees of freedom (DOF). The construction is compact, but can be further miniaturized, is flexible and manufacturing costs are low. On the basis of this mechanical concept a new, small automated manipulator for surgical application will be developed.

  3. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  4. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  5. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  6. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  7. Do post-mining constructed channels replace functional characteristics of headwater streams?

    EPA Science Inventory

    Mountaintop mining and valley fill (MTMVF) is a method of coal mining common in eastern Kentucky and southern West Virginia. Over 1200 miles of stream channel have been buried by MTMVF. Permits for surface coal mining have recognized constructed drainage ditches associated with ...

  8. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  9. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  10. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  11. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  12. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  13. 76 FR 3892 - Auction of FM Broadcast Construction Permits Rescheduled for April 27, 2011; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    .... The commenter also argues that, in the event that only one applicant places a bid on a permit, that...). The Commission makes no warranty whatsoever with respect to the FCC Auction System. In no event shall..., 2011 Short-Form Application (FCC Form 175) Filing Window Opens--January 31, 2011; 12 noon ET Short-Form...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, C.; Blake, C.; Burgess, R.

    This report explains the Regulations, Codes, and Standards (RCS) requirements for hydrogen dispensing stations in the State of California. The reports shows the basic components of a hydrogen dispensing station in a simple schematic drawing; the permits and approvals that would typically be required for the construction and operation of a hydrogen dispensing station; and a basic permit that might be employed by an Authority Having Jurisdiction (AHJ).

  15. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  16. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  18. Methods for generating or increasing revenues from crops

    DOEpatents

    Copenhaver, Gregory P.; Keith, Kevin; Preuss, Daphne

    2007-03-20

    The present invention provides methods of doing business and providing services. For example, methods of increasing the revenue of crops are provided. To this end, the method includes the use of a nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and mini chromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  19. 36 CFR 212.8 - Permission to cross lands and easements owned by the United States and administered by the Forest...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interests of the United States. Permits for such road construction or use will be non-exclusive and will be... States and administered by the Forest Service. (a) Permission to construct or use roads across lands and... benefit is needed by the United States, permission to construct or use a road across lands and across...

  20. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  1. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  2. Safety yoke would protect construction workers from falling

    NASA Technical Reports Server (NTRS)

    Goforth, O. H.

    1967-01-01

    Simple dismountable yoke protects construction workers on narrow steel I beams at high levels. The yoke engages the upper flat of the I beam and slides freely along it to permit freedom of movement to the worker while limiting his ability to fall by a harness attached to the yoke.

  3. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  4. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  5. Discontinuation of approval of modifications in notes, guaranteed under Title VI or VII of the Public Health Service Act, proposed to permit use of the notes as collateral for tax-exempt financings--PHS. Final rule.

    PubMed

    1983-09-21

    The Department of Health and Human Services (HHS) adds a new section to regulations for making and guaranteeing loans for construction and modernization of hospitals and medical facilities and to regulations for guaranteeing loans for the construction of teaching facilities for health professions personnel. Under these regulations HHS will not approve the modification of the terms of an existing loan guaranteed under Title VI or Title VII of the Public Health Service (PHS) Act if the modification would permit use of the guarantee (or guaranteed loan) as collateral for tax-exempt financing.

  6. Battery cell feedthrough apparatus

    DOEpatents

    Kaun, Thomas D.

    1995-01-01

    A compact, hermetic feedthrough apparatus comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance.

  7. December 30, 2003 Petition Requesting the Administrator Object to Chemical Lime Company's and Granite Construction Company's Apex Facility's Title V Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. 10 CFR 50.33 - Contents of applications; general information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (e) The class of license applied for, the use to which the facility will be put, the period of time... applicable, the following should be provided: (1) If the application is for a construction permit, the... assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle...

  9. 75 FR 30057 - Proposed Issuance of an Incidental Take Permit to Energy Northwest for Construction and Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... consist of up to 32 wind turbines with a generating capacity of 82 megawatts (MW) of electricity. Power generated by the wind turbines would be transmitted to the existing Bonneville Power Administration... conjunction with the construction, operation, maintenance, and decommissioning of the Radar Ridge Wind Project...

  10. 40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... technologies, operational measures, or restoration measures should be included in the permit to meet the... evaluate the performance of the design and construction technologies, operational measures, and/or... construction technologies, operational measure, and/or restoration measures, and/or improved operation and...

  11. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  12. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  13. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  14. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  15. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may...

  16. 76 FR 16440 - Endangered and Threatened Wildlife and Plants; Permits, Town of Apple Valley, San Bernardino...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...

  17. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  18. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  19. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  20. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  1. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  2. On the next generation of reliability analysis tools

    NASA Technical Reports Server (NTRS)

    Babcock, Philip S., IV; Leong, Frank; Gai, Eli

    1987-01-01

    The current generation of reliability analysis tools concentrates on improving the efficiency of the description and solution of the fault-handling processes and providing a solution algorithm for the full system model. The tools have improved user efficiency in these areas to the extent that the problem of constructing the fault-occurrence model is now the major analysis bottleneck. For the next generation of reliability tools, it is proposed that techniques be developed to improve the efficiency of the fault-occurrence model generation and input. Further, the goal is to provide an environment permitting a user to provide a top-down design description of the system from which a Markov reliability model is automatically constructed. Thus, the user is relieved of the tedious and error-prone process of model construction, permitting an efficient exploration of the design space, and an independent validation of the system's operation is obtained. An additional benefit of automating the model construction process is the opportunity to reduce the specialized knowledge required. Hence, the user need only be an expert in the system he is analyzing; the expertise in reliability analysis techniques is supplied.

  3. The other side of the broken window: a methodology that translates building permits into an ecometric of investment by community members.

    PubMed

    O'Brien, Daniel Tumminelli; Montgomery, Barrett W

    2015-03-01

    Much research has focused on physical disorder in urban neighborhoods as evidence that the community does not maintain local norms and spaces. Little attention has been paid to the opposite: indicators of proactive investment in the neighborhood's upkeep. This manuscript presents a methodology that translates a database of approved building permits into an ecometric of investment by community members, establishing basic content, criteria for reliability, and construct validity. A database from Boston, MA contained 150,493 permits spanning 2.5 years, each record including the property to be modified, permit type, and date issued. Investment was operationalized as the proportion of properties in a census block group that underwent an addition or renovation, excluding larger developments involving the demolition or construction of a building. The reliability analysis found that robust measures could be generated every 6 months, and that longitudinal analysis could differentiate between trajectories across neighborhoods. The validity analysis supported two hypotheses: investment was best predicted by homeownership and median income; and maintained an independent relationship with measures of physical disorder despite controlling for demographics, implying that it captures the other end of a spectrum of neighborhood maintenance. Possible uses for the measure in research and policy are discussed.

  4. Conceptual design of a mobile remote manipulator system

    NASA Technical Reports Server (NTRS)

    Bush, H. G.; Mikulas, M. M., Jr.; Wallsom, R. E.; Jensen, J. K.

    1984-01-01

    A mobile remote manipulator system has been identified as a necessary device for space station. A conceptual design for an MRMS is presented which features (1) tracks on the MRMS and guide pins only on the truss structure, (2) a push/pull drive mechanism which rotates to permit movement in four directions, and (3) spacecrane and mobile foot restraint manipulators (or arms). Operational and design features of the MRMS elements are described and illustrated. Concepts are also presented which permit rotating the operational plane of the MRMS through 90 deg. Such a system has been found to have great utility for initial space station construction, maintenance and repair, and to provide a construction capability for future station growth or large spacecraft assembly and/or servicing.

  5. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  6. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  7. 33 CFR 241.4 - General policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities... permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances...

  8. Battery cell feedthrough apparatus

    DOEpatents

    Kaun, T.D.

    1995-03-14

    A compact, hermetic feedthrough apparatus is described comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance. 8 figs.

  9. Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows

    DTIC Science & Technology

    2017-07-01

    greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health

  10. 40 CFR Table 1 to Subpart Ggg of... - General Provisions Applicability to Subpart GGG

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Yes 63.1(d) [Reserved] NA 63.1(e) Applicability of permit program before a relevant standard has been...) [Reserved] NA 63.5(b)(3) New construction/reconstruction Yes Except for changes and additions authorized... Yes 63.5(c) [Reserved] NA 63.5(d) Application for approval of construction/reconstruction Yes Except...

  11. 40 CFR Table 1 to Subpart Ggg of... - General Provisions Applicability to Subpart GGG

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Yes 63.1(d) [Reserved] NA 63.1(e) Applicability of permit program before a relevant standard has been...) [Reserved] NA 63.5(b)(3) New construction/reconstruction Yes Except for changes and additions authorized... Yes 63.5(c) [Reserved] NA 63.5(d) Application for approval of construction/reconstruction Yes Except...

  12. 78 FR 31536 - California State Nonroad Engine Pollution Control Standards; In-Use Heavy Duty Vehicles (as...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... immediately attempt to regulate new farm and construction equipment and that under any compliance pathway a... from new nonroad engines which are used in construction equipment or vehicles or used in farm equipment... with section 202(a) if: (1) There is inadequate lead time to permit the development of the necessary...

  13. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  14. The Construction of an Organizational Climate Description Questionnaire for Academic Departments in Colleges and Universities.

    ERIC Educational Resources Information Center

    Borrevik, Berge Andrew, Jr.

    The purpose of this investigation was to construct an Organizational Climate Description Questionnaire-Higher Education that would permit portrayal of the organizational climate of academic departments within colleges and universities. Data collected from the completion of pilot and research instruments was obtained from the faculty members in 72…

  15. Combustor liner construction

    NASA Technical Reports Server (NTRS)

    Craig, H. M.; Wagner, W. B.; Strock, W. J. (Inventor)

    1983-01-01

    A combustor liner is fabricated from a plurality of individual segments each containing counter/parallel Finwall material and are arranged circumferentially and axially to define the combustion zone. Each segment is supported by a hook and ring construction to an opened lattice frame with sufficient tolerance between the hook and ring to permit thermal expansion with a minimum of induced stresses.

  16. 75 FR 49949 - Notice of Lodging of Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... limitations at two wastewater treatment plants, and failed to meet permit construction deadlines for its Sand Island treatment plant. The State of Hawaii has joined as a co-plaintiff and brings its own claims under... control program for the discharge of grease. In addition, CCH agrees to complete construction of...

  17. 76 FR 52344 - Application for an Incidental Take Permit for the Madison Cave Isopod From Dominion Virginia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... gas-fired combined-cycle power station in Warren County, Virginia, extending over the next 9 years... construction of a new natural gas-fired combined-cycle power station in Warren County, Virginia. A conservation... cause take of the Madison Cave isopod. Dominion Virginia Power proposes to construct a natural gas-fired...

  18. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  19. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  20. 47 CFR 32.2423 - Buried cable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2423 Buried cable. (a... of cleaning manholes and ducts in connection with construction work and the cost of permits and...

  1. 33 CFR 323.3 - Discharges requiring permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...

  2. 33 CFR 323.3 - Discharges requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... procedures of these regulations. Agreement for construction or engineering services performed for other... limited to, the following: Projects where the pilings are so closely spaced that sedimentation rates would...

  3. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  4. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  5. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  6. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  7. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  8. Automated Item Banking and Test Development. Final Technical Paper for Period October 1987-April 1988.

    ERIC Educational Resources Information Center

    Lee, William M.; And Others

    Projects to develop an automated item banking and test development system have been undertaken on several occasions at the Air Force Human Resources Laboratory (AFHRL) throughout the past 10 years. Such a system permits the construction of tests in far less time and with a higher degree of accuracy than earlier test construction procedures. This…

  9. 77 FR 51981 - Notice of Intent To Prepare a Draft Environmental Impact Statement on the Construction and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... assist in meeting State of Florida water quality standards by attenuating peak stormwater flows and... Area A1 Flow Equalization Basin, Palm Beach County, FL AGENCY: Department of the Army, U.S. Army Corps...) permit under Section 404 of the Clean Water Act for construction and operation of a Flow Equalization...

  10. PBO Facility Construction: Basin and Range and Rocky Mountain Regions Status

    NASA Astrophysics Data System (ADS)

    Friesen, B.; Jenkins, F.; Kasmer, D.; Feaux, K.

    2007-12-01

    The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three- dimensional strain field resulting from active plate boundary deformation across the western United States. PBO is a large construction project involving the reconnaissance, permitting, installation, documentation, and maintenance of 875 permanent GPS stations in five years. 163 of these stations lie within the Basin and Range and Rocky Mountain Regions consisting of the states of Montana, Idaho, Nevada, Utah, Wyoming, Colorado, New Mexico, and Arizona. During the fourth year of the project, the Basin and Range and Rocky Mountain regions of PBO completed reconnaissance and nearly all permitting activities, and maintained a fast pace of station installations. The fall of 2006 and spring of 2007 were devoted to the construction of a large push of 50 stations, most located on Bureau of Land Management controlled public lands in Nevada. This transect is located along Highway 50 and will profile the extension of the Basin and Range province. The Yellowstone area, including surrounding National Parks and Forests was the target of summer 2007, during which time 10 remote stations with difficult logistics were installed. To date, construction is complete for 135 of 163 GPS stations.

  11. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  12. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  13. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Geomembranes (flexible membrane liners); (v) Leachate collection and removal systems and leak detection systems..., leachate collection and removal system, leak detection system, and final cover system, according to permit...

  14. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  15. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  16. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  17. Box Cello Middle School Science Clubs

    NASA Astrophysics Data System (ADS)

    Vandegrift, Guy

    1998-10-01

    The Box Cello is a middle school science club which is attempting to (1) understand the cello and (2) design a low-cost starter instrument. We can support and justify this research by adding a third goal: (3) to help supply local science classes with equipment. My policy of spending one entire day each week away from the university, out in a local school is essential to this project. This schedule also permits me to conduct lessons on optics and music in the schools. And, it permits circulation of tools and equipment. A simple calculation demonstrates the great economy achieved by combining science clubs with academic year school visits. Consider the cost of letting 10,000 students in 10 middle schools each learn about and play with a pair of "upside-down" glasses for one hour. A visit to each school for three consecutive weeks would easily permit such a circulation if only 30 pairs were constructed. Assume rhetorically, that the construction of 30 pairs of glasses were to consume the entire estimated annual budget of $100,000. The cost per student would be only ten dollars! The visits, guest lectures, and equipment loans permit informal networking (including lunch) with math, science and music teachers in 10 schools. For more information, visit the http://www.utep.edu/boxcello/

  18. 33 CFR 322.3 - Activities requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... States that are part of the civil works activities of the Corps of Engineers, unless covered by a... separate regulations. Agreement for construction or engineering services performed for other agencies by...

  19. 33 CFR 322.3 - Activities requiring permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... States that are part of the civil works activities of the Corps of Engineers, unless covered by a... separate regulations. Agreement for construction or engineering services performed for other agencies by...

  20. Unique construction makes interferometer insensitive to mechanical stresses

    NASA Technical Reports Server (NTRS)

    Beer, R.

    1965-01-01

    Michelson-type interferometer with a cat-eye reflector operates effectively even in the presence of random mechanical stresses. A cubical beamsplitter with dichroic surfaces permits operation in infrared or visible light.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, Ian

    To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

  2. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  3. Video display engineering and optimization system

    NASA Technical Reports Server (NTRS)

    Larimer, James (Inventor)

    1997-01-01

    A video display engineering and optimization CAD simulation system for designing a LCD display integrates models of a display device circuit, electro-optics, surface geometry, and physiological optics to model the system performance of a display. This CAD system permits system performance and design trade-offs to be evaluated without constructing a physical prototype of the device. The systems includes a series of modules which permit analysis of design trade-offs in terms of their visual impact on a viewer looking at a display.

  4. Source Construction Prior to Issuance of PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Permitting Multi-Phase Construction Under PSD Regulations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Final Environmental Impact Statement Permit Application by United States Steel Corp. Proposed Lake Front Steel Mill, Conneaut, Ohio. Volume 1,

    DTIC Science & Technology

    1979-04-01

    FRONT STEEL MILL CONNEAUT, OHIO 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(a) S. CONTRACT OR GRANT NUMBERS) Paul G. Leuchner and Gregory P. Keppel... PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK AREA & WORK UNIT NUMBERS U.S. Army Engineer District, Buffalo 1776 Niagara...the Army permit to perform certain work in Lake Erie and its tributaries. Activities proposed by the applicant include the construction of a water

  7. 34 CFR 104.23 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... effective date of this part in a manner that affects or could affect the usability of the facility or part... use of other methods are permitted where substantially equivalent or greater access to and usability...

  8. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effective date of this subpart in a manner that affects or could affect the usability of the facility or... use of other methods are permitted where substantially equivalent or greater access to and usability...

  9. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...

  10. 34 CFR 104.23 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... effective date of this part in a manner that affects or could affect the usability of the facility or part... use of other methods are permitted where substantially equivalent or greater access to and usability...

  11. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  12. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  13. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  14. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  15. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... effective date of this subpart in a manner that affects or could affect the usability of the facility or... use of other methods are permitted where substantially equivalent or greater access to and usability...

  16. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subpart, in a manner that affects or could affect the usability of the facility or part of the facility... of other methods are permitted where substantially equivalent or greater access to and usability of...

  17. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  18. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  19. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  20. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  1. 47 CFR 74.705 - TV broadcast analog station protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... from the authorized maximum radiated power (without depression angle correction), the horizontal... application for a new UHF low power TV or TV translator construction permit, a change of channel, or a major...

  2. 10 CFR 2.649 - Partial decisions on limited work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations Phased Applications... same time as in the case of a full decision relating to the issuance of a construction permit or...

  3. 77 FR 64844 - Notice of Application for Special Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... construction, specifically duplex stainless steels. (mode 1) 15716-N Department of 49 CFR 49 CFR Sec. To authorize the Energy, 173.310. transportation in Washington, DC. commerce of boron trifluoride in radiation...

  4. Estimating the discharge for ordinary high water levels in Kansas.

    DOT National Transportation Integrated Search

    2014-09-01

    The water resource design community in Kansas, including the Kansas Department of Transportation : (KDOT), is required to obtain appropriate permits for construction projects. Projects that involve stream : modification, including drainage structures...

  5. 75 FR 48628 - Approval and Promulgation of Implementation Plans; State of Nebraska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... compounds; clarify language and incorporate rules related to construction permits to incorporate application... clarify language related to open fires and explicitly include an exemption for fires used for religious...

  6. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  7. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that affects or could affect the usability of the facility or part of the facility shall, to the... permitted where substantially equivalent or greater access to and usability of the building is provided. (2...

  8. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manner that affects or could affect the usability of the facility or part of the facility shall, to the... are permitted where substantial equivalent or greater access to and usability of the building is...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchsbaum, L.

    Phoenix Coal currently operates 3 surface coal mines in Western Kentucky and have recently obtained the permits to construct their first underground mine. The expansion of the Phoenix Coal company since its formation in July 2004 is described. 4 photos.

  10. United States housing, 2012

    Treesearch

    Delton Alderman

    2013-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing completions for single and multifamily units, and sales and construction. This report will be updated annually.

  11. 24 CFR 3285.307 - Perimeter support piers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... support piers. (a) Piers required at mate-line supports, perimeter piers, and piers at exterior wall openings are permitted to be constructed of single open-cell or closed-cell concrete blocks, with nominal...

  12. Specifically Designed Constructed Wetlands: A Novel Treatment Approach for Scrubber Wastewater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John H. Rodgers Jr; James W. Castle; Chris Arrington: Derek Eggert

    2005-09-01

    A pilot-scale wetland treatment system was specifically designed and constructed at Clemson University to evaluate removal of mercury, selenium, and other constituents from flue gas desulfurization (FGD) wastewater. Specific objectives of this research were: (1) to measure performance of a pilot-scale constructed wetland treatment system in terms of decreases in targeted constituents (Hg, Se and As) in the FGD wastewater from inflow to outflow; (2) to determine how the observed performance is achieved (both reactions and rates); and (3) to measure performance in terms of decreased bioavailability of these elements (i.e. toxicity of sediments in constructed wetlands and toxicity ofmore » outflow waters from the treatment system). Performance of the pilot-scale constructed wetland treatment systems was assessed using two criteria: anticipated NPDES permit levels and toxicity evaluations using two sentinel toxicity-testing organisms (Ceriodaphnia dubia and Pimephales promelas). These systems performed efficiently with varied inflow simulations of FGD wastewaters removing As, Hg, and Se concentrations below NPDES permit levels and reducing the toxicity of simulated FGD wastewater after treatment with the constructed wetland treatment systems. Sequential extraction procedures indicated that these elements (As, Hg, and Se) were bound to residual phases within sediments of these systems, which should limit their bioavailability to aquatic biota. Sediments collected from constructed wetland treatment systems were tested to observe toxicity to Hyalella azteca or Chironomus tetans. Complete survival (100%) was observed for H. azteca in all cells of the constructed wetland treatment system and C. tentans had an average of 91% survival over the three treatment cells containing sediments. Survival and growth of H. azteca and C. tentans did not differ significantly between sediments from the constructed wetland treatment system and controls. Since the sediments of the constructed wetland treatment system are repositories for As, Hg, and Se and the bioavailability of these elements decreased after deposition, the pilot-scale constructed wetland treatment system contributed significantly to mitigation of risks to aquatic life from these elements.« less

  13. Interferograms, schlieren, and shadowgraphs constructed from real- and ideal-gas, two- and three-dimensional computed flowfields

    NASA Technical Reports Server (NTRS)

    Yates, Leslie A.

    1993-01-01

    The construction of interferograms, schlieren, and shadowgraphs from computed flowfield solutions permits one-to-one comparisons of computed and experimental results. A method of constructing these images from both ideal- and real-gas, two and three-dimensional computed flowfields is described. The computational grids can be structured or unstructured, and multiple grids are an option. Constructed images are shown for several types of computed flows including nozzle, wake, and reacting flows; comparisons to experimental images are also shown. In addition, th sensitivity of these images to errors in the flowfield solution is demonstrated, and the constructed images can be used to identify problem areas in the computations.

  14. Interferograms, Schlieren, and Shadowgraphs Constructed from Real- and Ideal-Gas, Two- and Three-Dimensional Computed Flowfields

    NASA Technical Reports Server (NTRS)

    Yates, Leslie A.

    1992-01-01

    The construction of interferograms, schlieren, and shadowgraphs from computed flowfield solutions permits one-to-one comparisons of computed and experimental results. A method for constructing these images from both ideal- and real-gas, two- and three-dimensional computed flowfields is described. The computational grids can be structured or unstructured, and multiple grids are an option. Constructed images are shown for several types of computed flows including nozzle, wake, and reacting flows; comparisons to experimental images are also shown. In addition, the sensitivity of these images to errors in the flowfield solution is demonstrated, and the constructed images can be used to identify problem areas in the computations.

  15. Estimating the discharge for ordinary high water levels in Kansas : [technical summary].

    DOT National Transportation Integrated Search

    2014-09-01

    The water resource design community in Kansas, including the Kansas Department : of Transportation (KDOT), is required to obtain appropriate permits for construction : projects. Projects that involve stream modification, including drainage structures...

  16. Army Response Letter - signed April 27, 1988

    EPA Pesticide Factsheets

    Army response letter regarding a request to elevate the decision of the New England Division Engineer (DE) to issue a permit to the Maine Department of Transportation to construct a marine terminal at Sears Island.

  17. 49 CFR 176.800 - General stowage requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... protection extending to the sides of the carboy box. This protective construction must be strong enough to permit stacking one on top of the other. (d) A Class 8 (corrosive material) material may not be stowed...

  18. Storm water best management practices for local roadways.

    DOT National Transportation Integrated Search

    2015-09-01

    Local communities and the Ohio Department of Transportation (ODOT) are required by the Ohio : Environmental Protection Agencys (Ohio EPA) statewide Construction General Permit for Storm : Water Discharges OHC000004 (CGP) to select, design, constru...

  19. The four spot time-of-flight laser anemometer

    NASA Technical Reports Server (NTRS)

    Wernet, Mark P.

    1985-01-01

    The newly constructed, four-spot anemometer was shown to perform as predicted. The new anemometer's measurement region has the required characteristics: wide acceptance angle and high spatial selectivity to permit measurements in turbulent, hostile environments.

  20. Drywall construction and asbestos exposure.

    PubMed

    Fischbein, A; Rohl, A N; Langer, A M; Selikoff, I J

    1979-05-01

    The rapid development of the drywall construction trade in the United States is described. It is estimated that some 75,000 U.S. construction workers are currently employed in this trade. The use of a variety of spackle and taping compounds is shown to be associated with significant asbestos exposure; air samples taken in the breathing zone by drywall tapers during sanding of taping compounds show fiber concentrations exceeding, by several times, the maximum level permitted by United States Government regulations. These findings are given together with the result of a clinical field survey of drywall construction workers demonstrating that asbestos disease may be an important health hazard in this trade.

  1. A Guide for Marina and Harbor Managers

    DTIC Science & Technology

    1991-03-01

    the natural ecology of an area, and harm wildlife habitat and breeding areas. Permit authority and environmental protection agencies are designed to...designed to serve boats of various sizes. They are usually constructed of wood or metal docks that are either mounted on piers, anchored, or of the...find information on berthing facilities for possible construction. He would be referred to the laws section and the regulation that governs contruction

  2. Environmental Assessment for the Construction and Operation of an Indoor Small Arms Range at Niagara Falls Air Reserve Station, New York

    DTIC Science & Technology

    2009-08-01

    Name Northern flicker Colaptes auratus Northern harrier2 Circus cyaneus Northern mockingbird Mimus polyglottos Northern rough-winged swallow...Installation operations impact wildlife habitat. Disturbance of vegetation by construction. Displacement and potential to kill or injure...Unless otherwise permitted by regulations, the MBTA makes it unlawful to pursue, hunt, take, capture, or kill ; attempt to take, capture or kill

  3. Computerized tomography using video recorded fluoroscopic images

    NASA Technical Reports Server (NTRS)

    Kak, A. C.; Jakowatz, C. V., Jr.; Baily, N. A.; Keller, R. A.

    1975-01-01

    A computerized tomographic imaging system is examined which employs video-recorded fluoroscopic images as input data. By hooking the video recorder to a digital computer through a suitable interface, such a system permits very rapid construction of tomograms.

  4. A Direct Reading Thermometer Based on a Silicon Diode.

    ERIC Educational Resources Information Center

    Kirkup, L.; Tonthat, C.

    1998-01-01

    Describes a simple circuit based on an inexpensive quad operational amplifier that permits a direct-reading temperature instrument to be constructed using silicon diodes. Encourages the use of this equipment in introductory thermal experiments. (DDR)

  5. 47 CFR 1.2102 - Eligibility of applications for competitive bidding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to the public; (2) Initial licenses or construction permits for digital television service given to... applications filed after July 26, 1993, in the Interactive Video Data Service (see 47 CFR part 95, subpart F...

  6. 36 CFR 7.91 - Whiskeytown Unit, Whiskeytown-Shasta-Trinity National Recreation Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... marine toilets so constructed as to permit wastes to be discharged directly into the water shall have such facilities sealed to prevent discharge. (2) Chemical or other type marine toilets with approved...

  7. 36 CFR 7.91 - Whiskeytown Unit, Whiskeytown-Shasta-Trinity National Recreation Area.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... marine toilets so constructed as to permit wastes to be discharged directly into the water shall have such facilities sealed to prevent discharge. (2) Chemical or other type marine toilets with approved...

  8. Scavenging a Piston-ported Two-stroke Cylinder

    NASA Technical Reports Server (NTRS)

    Rogowski, A R; Bouchard, C L

    1938-01-01

    An investigation was made with a specially designed engine to determine the scavenging characteristics of a large number of inlet-port shapes and arrangements and the optimum port arrangement and timing for this particular type of engine. A special cylinder construction permitted wide variations in timing for this particular type of engine. A special cylinder construction permitted wide variations in timing as well as in shape and arrangement of both the inlet and exhaust ports. The study of the effect of port shape combinations and timings on engine performance was made using illuminating gas as a fuel. Through variations in inlet-port arrangement and port timings, the value of the scavenging efficiency was increased from an original 44 percent to approximately 67 percent with a corresponding increase in power. With the optimum port arrangement and timing determined, a large number of performance runs were made under both spark-ignition and compression-ignition operation.

  9. Construction of hydrodynamic bead models from high-resolution X-ray crystallographic or nuclear magnetic resonance data.

    PubMed Central

    Byron, O

    1997-01-01

    Computer software such as HYDRO, based upon a comprehensive body of theoretical work, permits the hydrodynamic modeling of macromolecules in solution, which are represented to the computer interface as an assembly of spheres. The uniqueness of any satisfactory resultant model is optimized by incorporating into the modeling procedure the maximal possible number of criteria to which the bead model must conform. An algorithm (AtoB, for atoms to beads) that permits the direct construction of bead models from high resolution x-ray crystallographic or nuclear magnetic resonance data has now been formulated and tested. Models so generated then act as informed starting estimates for the subsequent iterative modeling procedure, thereby hastening the convergence to reasonable representations of solution conformation. Successful application of this algorithm to several proteins shows that predictions of hydrodynamic parameters, including those concerning solvation, can be confirmed. PMID:8994627

  10. Applicability of PSD to Portions of a Plant Constructed in Phases Without Permits

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Clarification Concerning the Scope of Construction-Related Activities that may Occur prior to Issuance of a PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Environmental Assessment for the Proposed Construction and Operation of an Outdoor Recreation Equipment Rental Facility at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2004-10-01

    permit was originally issued on 28 August 1997, most recently reissued as of 01 July 2002, and expires 30 June 2007 (BAFB 2001). In July 2002, the...the months during winter, spring, and fall to 9.8 million gallons for the summer months, such as July . In the first quarter of FY 04, BAFB diverted...PS Form 3811, July 1999 Domestic Return Receipt UNITED STATES POSTAL SERVICE 102595-99-M-1 First-Class Mail Postage & Fees Paid USPS Permit No

  13. Interpretation of Constructed as it Applies to Activities Undertaken Prior to Issuance of a PSD Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Guidance Determining Applicability of New Major Source Regulations in the Granting of Construction Permits to Sources of Air Emissions

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Waterproof stretchable optoelectronics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, John A.; Kim, Rak-Hwan; Kim, Dae-Hyeong

    Described herein are flexible and stretchable LED arrays and methods utilizing flexible and stretchable LED arrays. Assembly of flexible LED arrays alongside flexible plasmonic crystals is useful for construction of fluid monitors, permitting sensitive detection of fluid refractive index and composition. Co-integration of flexible LED arrays with flexible photodetector arrays is useful for construction of flexible proximity sensors. Application of stretchable LED arrays onto flexible threads as light emitting sutures provides novel means for performing radiation therapy on wounds.

  16. Environmental Assessment for Construction of Visiting Quarters - Phases One and Two, MacDill AFB, Florida

    DTIC Science & Technology

    2011-07-13

    kilometers of a Class I area ; therefore, the PSD regulations do not apply. Affected Environment Environmental Assessment for Construction of...Federal agencies, to the extent permitted by law and mission, to identify and assess environmental health and safety risks that might...disproportionate risks . The order defines environmental health and safety risks as “ risks to health or to safety that are attributable to products or

  17. Environmental Assessment: 49th Materiel Maintenance Group BEAR Base Improvements Holloman Air Force Base, New Mexico

    DTIC Science & Technology

    2004-08-01

    land clearing action will be an irreversible commitment of resources. 4.3.2 Water Quality Construction project impacts to storm water quality can...nearby monitored outfalls for the MSGP. High turbidity, suspended solids, and decreased cross section due to deposition can violate storm water quality benchmarks...and result in a Notice of Violation for storm water quality permits. Beside erosive impacts, construction period activities can cause

  18. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ARC-xxxxx Foreign Carrier Affiliation Notification FCN-xxxxx International High Frequency IHF-xxxxx... PN released International High Frequency IHF-xxxxx International Public Fixed IPF-xxxxx Recognized... Foreign Carrier Affiliation Notification. International High Frequency: Construction Permits,Licenses...

  19. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ARC-xxxxx Foreign Carrier Affiliation Notification FCN-xxxxx International High Frequency IHF-xxxxx... PN released International High Frequency IHF-xxxxx International Public Fixed IPF-xxxxx Recognized... Foreign Carrier Affiliation Notification. International High Frequency: Construction Permits,Licenses...

  20. 75 FR 60735 - Proposed Issuance of Incidental Take Permits to the Washington Department of Fish and Wildlife...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ..., Ute ladies' tresses, Columbian white-tailed deer, gray wolf, grizzly bear, lynx, pygmy rabbit, and the... the Wildlife Areas including: horseback riding and dog field trial events; construction, maintenance...

  1. 24 CFR 941.303 - Site acquisition proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... least sixty (60) days after proposal submission. (c) Zoning. Evidence that construction or rehabilitation is permitted by current zoning ordinances or regulations or evidence to indicate that needed... stage. (e) Environmental assessment. All available environmental information on the proposed development...

  2. 24 CFR 941.303 - Site acquisition proposal.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... least sixty (60) days after proposal submission. (c) Zoning. Evidence that construction or rehabilitation is permitted by current zoning ordinances or regulations or evidence to indicate that needed... stage. (e) Environmental assessment. All available environmental information on the proposed development...

  3. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be Schedule 80 weight or heavier. Malleable metals must be used in the construction of valves and fittings. Where copper tubing is permitted, joints shall be brazed or be of equally strong metal union type...

  4. 10 CFR 205.325 - Annual report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at... maintain electric transmission facilities at international boundaries shall submit to the ERA, by February...

  5. 78 FR 73897 - SHINE Medical Technologies, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-608; NRC-2013-0053] SHINE Medical Technologies, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License application; docketing. SUMMARY: The U.S. Nuclear... construction permit, submitted by SHINE Medical Technologies, Inc. (SHINE) is acceptable for docketing...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  7. Fault Tolerant Real-Time Systems

    DTIC Science & Technology

    1993-09-30

    The ART (Advanced Real-Time Technology) Project of Carnegie Mellon University is engaged in wide ranging research on hard real - time systems . The...including hardware and software fault tolerance using temporal redundancy and analytic redundancy to permit the construction of real - time systems whose

  8. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  9. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  10. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  11. 40 CFR 145.23 - Program description.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and any State administrative or judicial review procedures. (d) Copies of the permit form(s... reviewing the wells for compliance with applicable monitoring, reporting, construction, and financial... for Class II enhanced oil recovery or enhanced gas recovery wells transitioning to Class VI injection...

  12. 40 CFR 145.23 - Program description.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and any State administrative or judicial review procedures. (d) Copies of the permit form(s... reviewing the wells for compliance with applicable monitoring, reporting, construction, and financial... for Class II enhanced oil recovery or enhanced gas recovery wells transitioning to Class VI injection...

  13. 40 CFR 145.23 - Program description.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and any State administrative or judicial review procedures. (d) Copies of the permit form(s... reviewing the wells for compliance with applicable monitoring, reporting, construction, and financial... for Class II enhanced oil recovery or enhanced gas recovery wells transitioning to Class VI injection...

  14. 40 CFR 145.23 - Program description.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and any State administrative or judicial review procedures. (d) Copies of the permit form(s... reviewing the wells for compliance with applicable monitoring, reporting, construction, and financial... for Class II enhanced oil recovery or enhanced gas recovery wells transitioning to Class VI injection...

  15. Palmdale Energy Project; Final Decision; Prevention of Significant Deterioration (PSD) Permit

    EPA Pesticide Factsheets

    EPA Region 9 is issuing a final decision to grant conditional approval, in accordance with the Clean Air Act, for the construction of a natural gas-fired combined cycle power plant known as the Palmdale Energy Project.

  16. 10 CFR 205.320 - Who shall apply.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... entity who operates an electric power transmission or distribution facility crossing the border of the... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  17. 10 CFR 205.323 - Transferability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Transferability. 205.323 Section 205.323 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  18. Elevation Request Letter to Army - signed April 29, 1986

    EPA Pesticide Factsheets

    A letter requesting a review of the decision to issue a permit to the Maine Department of Transportation (MEDOT) authorizing the construction of an access causeway and a marine cargo terminal in Penobscot Bay at Sears Island, Searsport, Maine.

  19. 78 FR 52579 - SHINE Medical Technologies, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-608; NRC-2013-0053] SHINE Medical Technologies, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: Notice of receipt and availability. SUMMARY: The U.S... application for a construction permit, submitted by SHINE Medical Technologies, Inc. (SHINE). ADDRESSES...

  20. 10 CFR 205.323 - Transferability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Transferability. 205.323 Section 205.323 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  1. 10 CFR 205.320 - Who shall apply.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at... United States, for the transmission of electric energy between the United States and a foreign country...

  2. Diver Operated Tools and Applications for Underwater Construction

    DTIC Science & Technology

    1987-01-01

    subsurface construction. rhe list is by no means exhaustive and new 3 methods and requirements continue to evolve. * 8 I NCUAPTUN TIM DIVINO OPMATIONS...length suit that permitted the exhaust air to escape under the hem. By 1840, Siebe made a full length waterproof suit and added an exhaust valve to...The open circuit scuba takes 3 air from the supply tank, is inhaled by th& diver, and then exhausted directly to the surrounding water. 3 The basic

  3. Finding of No Significant Impact and Finding of No Practicable Alternative: Construction of Visiting Quarters - Phase One and Phase Two MacDill Air Force Base, Florida

    DTIC Science & Technology

    2011-07-13

    the Munitions Storage Area . Although the tree has since succumb to pine beetles, Affected Environment Environmental Assessment for Construction...from Environmental Health Risks and Safety Risks requires Federal agencies, to the extent permitted by law and mission, to identify and assess ...pose a risk to workers or installation personnel. Industrial hygiene programs address Affected Environment Environmental Assessment for

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steiner, James

    This grant did not include administrative expenses/legal expenses, land or rights-of-way purchases or relocation expenses. The construction funds for the Fitness Center $932,100 and the Performance Lab $23,900 totaled $956,000. Actual dollars expended totaled, $956,509.22, $932,609.22 for the Fitness Center and $23,900 for the Performance Lab. The University contributed $509.22. The projects are completed and in use. All inspections and occupancy permits have been obtained. All contractors have released all construction leans.

  5. Ready-to-Use Tissue Construct for Military Bone and Cartilage Trauma

    DTIC Science & Technology

    2012-10-01

    times. We hypothesize that our Ready-to-Use constructs can successfully restore 3 cm critical size segmental defects in dog tibiae. We will examine the...defects) of the grant. The approved IACUC protocol permits 3 pilot dogs for Aim 1 and 3 pilot dogs for Aim 2. Several minor modifications to the...original IACUC protocol were required which are provided in the Appendix. All the pilot dogs were to receive scaffolds composed of 90% poly-caprolactone

  6. Qualitative differential games with two targets

    NASA Technical Reports Server (NTRS)

    Getz, W. M.; Leitmann, G.

    1977-01-01

    So-called differential games of kind (qualitative games) were considered involving two or more players each of whom possesses a target toward which he wished to steer the response of a dynamical system that was under the control of all players. Sufficient conditions were derived, which assure termination on a particular player's target. In general, these conditions were constructive in that they permited construction of a winning (terminating) strategy for a player. The theory is illustrated by a pursuit-evasion problem.

  7. Construction quality assurance report for the Y-12 Construction/Demolition Landfill VII (CDL VII), Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, P.M.

    This Construction Quality Assurance (CQA) Report provides documentation that Bid Option 2 of the Y-12 Plant Construction Demolition Landfill 7 (CDL-7) was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. CDL-7 is located in Anderson County on the south side of Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant in Oak Ridge, Tennessee. This report applies specifically to the limits of excavation for Area No. 1 portions of the perimeter maintenance road and drainage channel and Sedimentation Pond No.more » 3. A partial ``As-Built`` survey was performed and is included.« less

  8. 75 FR 22835 - Endangered and Threatened Wildlife and Plants; Permits, Santa Cruz County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... defined under the Act as ``to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect... would then implement the HCP. Construction of a pump house and pipeline for the Ma[ntilde]ana Woods HCP...

  9. 21 CFR 225.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...

  10. 47 CFR 1.87 - Modification of license or construction permit on motion of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... property is involved, the Commission may by order provide a shorter period of time. (b) The notification... provisions of this section, both the burden of proceeding with the introduction of evidence and the burden of...

  11. Investigating the cost-effectiveness of nutrient credit use as an option for stormwater permitting requirements.

    DOT National Transportation Integrated Search

    2014-07-01

    The purpose of this study was to determine the feasibility of the Virginia Department of Transportation (VDOT) : participating in water quality trading (WQT) in lieu of constructing onsite structural best management practices (BMPs) to : achieve comp...

  12. 36 CFR 251.53 - Authorities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... use authorizations for National Forest System land under the authorities cited and for the types of... oil or gas products, where no Federal land besides National Forest System lands is required, and permits for the temporary use of additional National Forest System lands necessary for construction...

  13. 36 CFR 251.53 - Authorities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... use authorizations for National Forest System land under the authorities cited and for the types of... oil or gas products, where no Federal land besides National Forest System lands is required, and permits for the temporary use of additional National Forest System lands necessary for construction...

  14. 36 CFR 251.53 - Authorities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... use authorizations for National Forest System land under the authorities cited and for the types of... oil or gas products, where no Federal land besides National Forest System lands is required, and permits for the temporary use of additional National Forest System lands necessary for construction...

  15. 36 CFR 251.53 - Authorities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... use authorizations for National Forest System land under the authorities cited and for the types of... oil or gas products, where no Federal land besides National Forest System lands is required, and permits for the temporary use of additional National Forest System lands necessary for construction...

  16. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  17. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  18. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  19. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  20. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  1. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  2. 23 CFR 645.213 - Use and occupancy agreements (permits).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 645.213 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC..., as a minimum, describe the requirements for location, construction, protection of traffic... description of the size, type, nature, and extent of the utility facilities being located within the highway...

  3. 23 CFR 645.213 - Use and occupancy agreements (permits).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 645.213 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC..., as a minimum, describe the requirements for location, construction, protection of traffic... description of the size, type, nature, and extent of the utility facilities being located within the highway...

  4. 10 CFR 205.327 - Other information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Other information. 205.327 Section 205.327 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  5. 15 CFR 971.602 - Significant adverse environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... testing of recovery equipment, the recovery of manganese nodules in commercial quantities from the deep seabed, and the construction and operation of commercial-scale processing facilities as activities which...

  6. 40 CFR 144.33 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics; (2) Within the same well field, facility site, reservoir, project, or similar unit in the same...) The requirements for construction, monitoring, reporting, operation, and abandonment, for all wells...; and (3) The cumulative effects of drilling and operation of additional injection wells are considered...

  7. 33 CFR 149.145 - What are the requirements for curbs, gutters, drains, and reservoirs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION..., drains, and reservoirs? Each pumping platform complex must have enough curbs, gutters, drains, and... ocean according to the port's National Pollution Discharge Elimination System permit. ...

  8. 33 CFR 149.145 - What are the requirements for curbs, gutters, drains, and reservoirs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION..., drains, and reservoirs? Each pumping platform complex must have enough curbs, gutters, drains, and... ocean according to the port's National Pollution Discharge Elimination System permit. ...

  9. Residential Construction Trends in America's Metropolitan Regions: 2010 and 2009 Editions

    EPA Pesticide Factsheets

    These two reports examine residential building permits in the 50 largest U.S. metropolitan regions at the county or jurisdictional level to determine whether there has been a shift toward redevelopment and which regions have seen the most change.

  10. 77 FR 42361 - Notice of Applications for Modification of Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... manufacture, mark, and B23; 173.241; sale and use of non-DOT 173.242; 178.345- specification cargo 1; -2; -3; -4; -7; tanks constructed of -14; -15; 178.347- fiberglass reinforced 1; -2; 178.348-1; plastic by...

  11. 42 CFR 137.338 - Must funds from other sources be incorporated into a construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL... Secretary must include funds from other agencies as permitted by law, whether on an ongoing or a one-time...

  12. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...

  13. 10 CFR 2.101 - Filing of application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... application dealing with radiological health and safety and environmental matters, notice of receipt will be... determination as to whether an application for a limited work authorization, construction permit, operating... Director, Office of Nuclear Material Safety and Safeguards, as appropriate. Amendments to the application...

  14. 76 FR 56951 - Licenses, Certifications, and Approvals for Materials Licensees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... applicants to take action that would have significant environmental impacts with no NRC oversight or... materials license facility to be prepared and significant environmental impacts to occur without undergoing... permit only limited construction activities and the environmental impacts associated with activities...

  15. Temporary traffic control and enforcement of traffic laws in closed road sections.

    DOT National Transportation Integrated Search

    2007-06-01

    "Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses locate...

  16. 10 CFR 50.70 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, provide... New Reactors, or the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and... construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC...

  17. 10 CFR 50.70 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, provide... New Reactors, or the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and... construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC...

  18. 10 CFR 50.70 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, provide... New Reactors, or the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and... construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC...

  19. 10 CFR 50.70 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, provide... New Reactors, or the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and... construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC...

  20. 10 CFR 50.70 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, provide... New Reactors, or the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and... construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC...

  1. 10 CFR 205.325 - Annual report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Annual report. 205.325 Section 205.325 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  2. 10 CFR 205.327 - Other information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Other information. 205.327 Section 205.327 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  3. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  5. USGS aerial resolution targets.

    USGS Publications Warehouse

    Salamonowicz, P.H.

    1982-01-01

    It is necessary to measure the achievable resolution of any airborne sensor that is to be used for metric purposes. Laboratory calibration facilities may be inadequate or inappropriate for determining the resolution of non-photographic sensors such as optical-mechanical scanners, television imaging tubes, and linear arrays. However, large target arrays imaged in the field can be used in testing such systems. The USGS has constructed an array of resolution targets in order to permit field testing of a variety of airborne sensing systems. The target array permits any interested organization with an airborne sensing system to accurately determine the operational resolution of its system. -from Author

  6. Detailed Project Report on Emergency Shoreline Protection, Section 14 Boggy Bayou, Valparaiso, Florida

    DTIC Science & Technology

    1989-08-01

    adjacent to Bayshore Drive. Along the shoreline within the current study area, (see Plate 4) private residents have constructed three wood piers and...a wood boat shed. The construction of piers and boat sheds is no longer permitted by the city. However, the piers and boat shed were allowed to remain...located in the project site. Removal and 6 replacement of the 3 wood piers and the boat shed and the steps that lead to them will be a responsibility of

  7. National Dam Safety Program. Stony Brook Watershed Dam Site Number 7 (NJ00344), Raritan River Basin, Stony Brook, Mercer County, New Jersey. Phase 1 Inspection Report.

    DTIC Science & Technology

    1980-02-01

    for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1

  8. Regional Sediment Management Strategies for the Vicinity of St. Augustine Inlet, St. Johns County, Florida

    DTIC Science & Technology

    2016-07-01

    period 1941 to 1957 resulted in the construction of a north sand-trap groin structure approxi- mately 1,880 ft in length and a 3,695 ft long southern...jetty structure . The inlet channel and associated structures are maintained by SAJ. The project includes an outer channel authorized to -16 ft mean...erosion, several homes had to be temporarily vacated for major repairs, and several structures were granted permits to construct temporary sea walls

  9. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  10. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  11. 29 CFR 1926.301 - Hand tools.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Tools-Hand and Power § 1926.301 Hand tools. (a) Employers shall not issue or permit the use of unsafe hand tools. (b) Wrenches, including adjustable, pipe, end...

  12. THERMOSTAT FOR LOWER TEMPERATURES

    PubMed Central

    Stier, T. J. B.; Crozier, W. J.

    1933-01-01

    Details are given concerning the construction and operation of relatively simple thermostats which permit maintaining precise temperatures down to 0°C. (with water), or temperatures above that of the ordinary room, and in which the temperature may be quickly altered at short intervals to new levels. PMID:19872736

  13. Region 9 Tribal Minor NSR: New Source General Application (Form NEW)

    EPA Pesticide Factsheets

    This form should be used to register New or Modified Minor Sources (except Oil and Gas Industry Sources until March 2, 2016) with proposed construction or modifications that are subject to minor NSR with the EPA Region 9 Tribal NSR Permitting Program.

  14. Complaint, Master Settlement Agreement et al. for John Hubenka and LeClair Irrigation District

    EPA Pesticide Factsheets

    In 2000, Mr. Hubenka discharged dredged and/or fill material into the Wind River by constructing a series of dikes in the river without first obtaining a CWA Section 404 permit from the Army Corps of Engineers (“Corps”).

  15. 49 CFR 195.216 - Welding: Miter joints.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Welding: Miter joints. 195.216 Section 195.216 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.216 Welding: Miter joints. A miter joint is not permitted (not including...

  16. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Corps NEPA Documents NEFA documents for Civil Works activities other than permits will be processed in... Preconstruction Engineering, and Design, Construction, and Completed Projects in an Operations and Maintenance... reconnaissance phase, the district commander should undertake environmental studies along with engineering...

  17. Debunking the Fire Sprinkler Myth.

    ERIC Educational Resources Information Center

    O'Connell, Thomas

    1996-01-01

    Sprinklers can protect school buildings, save lives, and actually reduce construction costs. Sprinkler-system costs can be easily offset by insurance savings, as well as by specific alternatives or design options permitted by nationally recognized building codes in view of the superior protection that sprinklers provide. (MLF)

  18. 10 CFR 205.326 - Filing procedures and fees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at... Utility Systems of the Economic Regulatory Administration and shall be accompanied by a filing fee of $150...

  19. 10 CFR 205.321 - Time of filing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Time of filing. 205.321 Section 205.321 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  20. 49 CFR 195.216 - Welding: Miter joints.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Welding: Miter joints. 195.216 Section 195.216 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.216 Welding: Miter joints. A miter joint is not permitted (not including...

  1. 49 CFR 195.216 - Welding: Miter joints.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Welding: Miter joints. 195.216 Section 195.216 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.216 Welding: Miter joints. A miter joint is not permitted (not including...

  2. 49 CFR 195.216 - Welding: Miter joints.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Welding: Miter joints. 195.216 Section 195.216 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.216 Welding: Miter joints. A miter joint is not permitted (not including...

  3. 49 CFR 195.216 - Welding: Miter joints.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Welding: Miter joints. 195.216 Section 195.216 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.216 Welding: Miter joints. A miter joint is not permitted (not including...

  4. Microparticle impact sensor measures energy directly

    NASA Technical Reports Server (NTRS)

    Alexander, W. M.; Berg, O. E.

    1965-01-01

    Construction of a capacitor sensor consisting of a dielectric layer between two conductive surface layers and connected across a potential source through a sensing resistor permits measurement of energy of impinging particles without degradation of sensitivity. A measurable response is produced without penetration of the dielectric layer.

  5. 40 CFR 165.25 - Nonrefillable container standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...

  6. 40 CFR 165.25 - Nonrefillable container standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...

  7. 40 CFR 165.25 - Nonrefillable container standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...

  8. 40 CFR 165.25 - Nonrefillable container standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...

  9. 40 CFR 165.25 - Nonrefillable container standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...

  10. Letter from Army to EPA accepting elevation - signed June 27, 1994

    EPA Pesticide Factsheets

    A letter in response to the request to review issues related to a Department of the Army permit that would allow Mr. Mike Cusack to construct a residential development within 15 acres of wetlands associated with Ktatt Bog in Anchorage, Alaska.

  11. 10 CFR 205.321 - Time of filing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Time of filing. 205.321 Section 205.321 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...

  12. 40 CFR 35.901 - Program policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Program policy. 35.901 Section 35.901... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.901 Program policy. The primary... (NPDES) permit requirements. The Regional Administrator and States are authorized and encouraged to...

  13. 40 CFR 35.901 - Program policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Program policy. 35.901 Section 35.901... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.901 Program policy. The primary... (NPDES) permit requirements. The Regional Administrator and States are authorized and encouraged to...

  14. 40 CFR 6.205 - Environmental assessments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... include: (1) The award of wastewater treatment construction grants under Title II of the Clean Water Act; (2) EPA's issuance of new source NPDES permits under section 402 of the Clean Water Act; (3) EPA... IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT AND ASSESSING THE ENVIRONMENTAL EFFECTS ABROAD OF EPA...

  15. 40 CFR 6.205 - Environmental assessments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... include: (1) The award of wastewater treatment construction grants under Title II of the Clean Water Act; (2) EPA's issuance of new source NPDES permits under section 402 of the Clean Water Act; (3) EPA... IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT AND ASSESSING THE ENVIRONMENTAL EFFECTS ABROAD OF EPA...

  16. 40 CFR 6.205 - Environmental assessments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... include: (1) The award of wastewater treatment construction grants under Title II of the Clean Water Act; (2) EPA's issuance of new source NPDES permits under section 402 of the Clean Water Act; (3) EPA... IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT AND ASSESSING THE ENVIRONMENTAL EFFECTS ABROAD OF EPA...

  17. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  18. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  19. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  20. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  1. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land...

  2. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land...

  3. 21 CFR 600.11 - Physical establishment, equipment, animals, and care.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 7 2011-04-01 2010-04-01 true Physical establishment, equipment, animals, and... designed and constructed to permit thorough cleaning and, where possible, inspection for cleanliness. All... each culture is designed to withstand handling without breaking. (3) Work with spore-forming...

  4. 76 FR 21338 - Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line... Mountain National Forest, and the Army Corps of Engineers, New England District, are cooperating agencies... information on the Army Corps of Engineers' permit [[Page 21339

  5. 10 CFR 52.137 - Contents of applications; technical information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...

  6. 10 CFR 52.137 - Contents of applications; technical information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...

  7. 10 CFR 52.137 - Contents of applications; technical information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...

  8. 10 CFR 52.137 - Contents of applications; technical information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...

  9. 75 FR 5565 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... and dynamic construction industry. Given the importance of this industry, several of the statistical... Authorized by Building Permits, (2) Housing Starts, and (3) New One-Family Houses Sold. These statistics help... economic indicators, to estimate the number of housing units started, completed, and sold (single-family...

  10. 10 CFR 50.52 - Combining licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Combining licenses. 50.52 Section 50.52 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of Licenses and Construction Permits § 50.52 Combining licenses. The Commission may combine in a...

  11. 77 FR 25868 - Iowa Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... and program and 702. exemption for coal extraction incidental to the extraction of other minerals. 27... for coal Part 707. extraction incident to government-- financed highway or other constructions. 27-40... standards--coal preparation plants not located within the permit area of a mine. 27-40.71 (207) State...

  12. 36 CFR 222.53 - Grazing fees in the East-noncompetitive procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... current period's hay price index, less the value of any agency required range improvements. (ii) Grazing Fee Credits for Range Improvements. Any requirements for permittee construction or development of range improvements shall be identified through an agreement and incorporated into the grazing permit...

  13. 10 CFR 50.35 - Issuance of construction permits. 1

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... principal architectural and engineering criteria for the design, and has identified the major features or... features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program...

  14. 10 CFR 50.35 - Issuance of construction permits. 1

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... principal architectural and engineering criteria for the design, and has identified the major features or... features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program...

  15. 29 CFR 1926.857 - Storage.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Storage. 1926.857 Section 1926.857 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.857 Storage. (a) The storage of waste... provide storage space for debris, provided falling material is not permitted to endanger the stability of...

  16. 29 CFR 1926.857 - Storage.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Storage. 1926.857 Section 1926.857 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.857 Storage. (a) The storage of waste... provide storage space for debris, provided falling material is not permitted to endanger the stability of...

  17. 29 CFR 1926.857 - Storage.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Storage. 1926.857 Section 1926.857 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.857 Storage. (a) The storage of waste... provide storage space for debris, provided falling material is not permitted to endanger the stability of...

  18. 29 CFR 1926.857 - Storage.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Storage. 1926.857 Section 1926.857 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.857 Storage. (a) The storage of waste... provide storage space for debris, provided falling material is not permitted to endanger the stability of...

  19. 29 CFR 1926.857 - Storage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Storage. 1926.857 Section 1926.857 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.857 Storage. (a) The storage of waste... provide storage space for debris, provided falling material is not permitted to endanger the stability of...

  20. 47 CFR 1.2102 - Eligibility of applications for competitive bidding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... radio services, including private internal radio services used by state and local governments and non-government entities and including emergency road services provided by not-for-profit organizations, that (i... to the public; (2) Initial licenses or construction permits for digital television service given to...

Top