Sample records for construction scheduling

  1. 77 FR 73659 - Federal Acquisition Regulation; Information Collection; Schedules for Construction Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...; Information Collection; Schedules for Construction Contracts AGENCIES: Department of Defense (DOD), General... approved information collection requirement concerning schedules for construction contracts. Public...: Submit comments identified by Information Collection 9000- 0058, Schedules for Construction Contracts by...

  2. 76 FR 60830 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...

  3. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...

  4. 75 FR 61752 - Auction of FM Broadcast Construction Permits Scheduled for March 29, 2011; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...

  5. 48 CFR 915.404-4-71-6 - Fee base.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...

  6. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...

  7. 48 CFR 53.301-1427 - Standard Form 1427, Inventory Schedule A-Construction Sheet (Metals in Mill Product Form).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Standard Form 1427, Inventory Schedule A-Construction Sheet (Metals in Mill Product Form). 53.301-1427 Section 53.301-1427... Illustrations of Forms 53.301-1427 Standard Form 1427, Inventory Schedule A—Construction Sheet (Metals in Mill...

  8. Enhancements to highway construction scheduling expert system.

    DOT National Transportation Integrated Search

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  9. Forensic Schedule Analysis of Construction Delay in Military Projects in the Middle East

    DTIC Science & Technology

    This research performs forensic schedule analysis of delay factors that impacted recent large-scale military construction projects in the Middle East...The methodologies for analysis are adapted from the Professional Practice Guide to Forensic Schedule Analysis, particularly Method 3.7 Modeled

  10. 48 CFR 36.515 - Schedules for construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contemplated, the contract amount is expected to exceed the simplified acquisition threshold, and the period of... covering other management approaches for ensuring that a contractor makes adequate progress. [48 FR 42356... Schedules for construction contracts. The contracting officer may insert the clause at 52.236-15, Schedules...

  11. Maglev guideway cost and construction schedule assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plotkin, D.; Kim, S.

    1997-05-01

    A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less

  12. 77 FR 42332 - Notice of Lodging of Consent Decree Modification Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... September 24, 2009 (``Decree''). The Decree resolved claims of the United States and State of New Hampshire... discharges from the combined sewer overflow (``CSO'') outfalls, propose a schedule for construction of a..., and upon inclusion of the schedule in the Decree, comply with the construction schedule. The City...

  13. Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Yang, Jyh-Bin

    2017-10-01

    The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

  14. 78 FR 72081 - Closed Auction of AM Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...

  15. Short-term scheduling of an open-pit mine with multiple objectives

    NASA Astrophysics Data System (ADS)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  16. A modify ant colony optimization for the grid jobs scheduling problem with QoS requirements

    NASA Astrophysics Data System (ADS)

    Pu, Xun; Lu, XianLiang

    2011-10-01

    Job scheduling with customers' quality of service (QoS) requirement is challenging in grid environment. In this paper, we present a modify Ant colony optimization (MACO) for the Job scheduling problem in grid. Instead of using the conventional construction approach to construct feasible schedules, the proposed algorithm employs a decomposition method to satisfy the customer's deadline and cost requirements. Besides, a new mechanism of service instances state updating is embedded to improve the convergence of MACO. Experiments demonstrate the effectiveness of the proposed algorithm.

  17. Algorithm of composing the schedule of construction and installation works

    NASA Astrophysics Data System (ADS)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  18. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  19. Vehicle and driver scheduling for public transit.

    DOT National Transportation Integrated Search

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  20. 10 CFR Appendix D to Part 2 - Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construction Authorization for a High-Level Waste Geologic Repository. D Appendix D to Part 2 Energy NUCLEAR.... D Appendix D to Part 2—Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic Repository. Day Regulation (10 CFR) Action 0 2.101(f)(8), 2.105(a)(5...

  1. 10 CFR Appendix D to Part 2 - Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construction Authorization for a High-Level Waste Geologic Repository. D Appendix D to Part 2 Energy NUCLEAR.... D Appendix D to Part 2—Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic Repository. Day Regulation (10 CFR) Action 0 2.101(f)(8), 2.105(a)(5...

  2. 48 CFR 452.236-75 - Maximum Workweek-Construction Schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... hours (including the daily starting and stopping times) and days of the week the Contractor proposes to... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Maximum Workweek...: Maximum Workweek—Construction Schedule (NOV 1996) Within __ calendar days after receipt of a written...

  3. Construction schedules slack time minimizing

    NASA Astrophysics Data System (ADS)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  4. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  5. Construction schedule simulation of a diversion tunnel based on the optimized ventilation time.

    PubMed

    Wang, Xiaoling; Liu, Xuepeng; Sun, Yuefeng; An, Juan; Zhang, Jing; Chen, Hongchao

    2009-06-15

    Former studies, the methods for estimating the ventilation time are all empirical in construction schedule simulation. However, in many real cases of construction schedule, the many factors have impact on the ventilation time. Therefore, in this paper the 3D unsteady quasi-single phase models are proposed to optimize the ventilation time with different tunneling lengths. The effect of buoyancy is considered in the momentum equation of the CO transport model, while the effects of inter-phase drag, lift force, and virtual mass force are taken into account in the momentum source of the dust transport model. The prediction by the present model for airflow in a diversion tunnel is confirmed by the experimental values reported by Nakayama [Nakayama, In-situ measurement and simulation by CFD of methane gas distribution at a heading faces, Shigen-to-Sozai 114 (11) (1998) 769-775]. The construction ventilation of the diversion tunnel of XinTangfang power station in China is used as a case. The distributions of airflow, CO and dust in the diversion tunnel are analyzed. A theory method for GIS-based dynamic visual simulation for the construction processes of underground structure groups is presented that combines cyclic operation network simulation, system simulation, network plan optimization, and GIS-based construction processes' 3D visualization. Based on the ventilation time the construction schedule of the diversion tunnel is simulated by the above theory method.

  6. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  7. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  8. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  9. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  10. Dynamic scheduling and planning parallel observations on large Radio Telescope Arrays with the Square Kilometre Array in mind

    NASA Astrophysics Data System (ADS)

    Buchner, Johannes

    2011-12-01

    Scheduling, the task of producing a time table for resources and tasks, is well-known to be a difficult problem the more resources are involved (a NP-hard problem). This is about to become an issue in Radio astronomy as observatories consisting of hundreds to thousands of telescopes are planned and operated. The Square Kilometre Array (SKA), which Australia and New Zealand bid to host, is aiming for scales where current approaches -- in construction, operation but also scheduling -- are insufficent. Although manual scheduling is common today, the problem is becoming complicated by the demand for (1) independent sub-arrays doing simultaneous observations, which requires the scheduler to plan parallel observations and (2) dynamic re-scheduling on changed conditions. Both of these requirements apply to the SKA, especially in the construction phase. We review the scheduling approaches taken in the astronomy literature, as well as investigate techniques from human schedulers and today's observatories. The scheduling problem is specified in general for scientific observations and in particular on radio telescope arrays. Also taken into account is the fact that the observatory may be oversubscribed, requiring the scheduling problem to be integrated with a planning process. We solve this long-term scheduling problem using a time-based encoding that works in the very general case of observation scheduling. This research then compares algorithms from various approaches, including fast heuristics from CPU scheduling, Linear Integer Programming and Genetic algorithms, Branch-and-Bound enumeration schemes. Measures include not only goodness of the solution, but also scalability and re-scheduling capabilities. In conclusion, we have identified a fast and good scheduling approach that allows (re-)scheduling difficult and changing problems by combining heuristics with a Genetic algorithm using block-wise mutation operations. We are able to explain and eradicate two problems in the literature: The inability of a GA to properly improve schedules and the generation of schedules with frequent interruptions. Finally, we demonstrate the scheduling framework for several operating telescopes: (1) Dynamic re-scheduling with the AUT Warkworth 12m telescope, (2) Scheduling for the Australian Mopra 22m telescope and scheduling for the Allen Telescope Array. Furthermore, we discuss the applicability of the presented scheduling framework to the Atacama Large Millimeter/submillimeter Array (ALMA, in construction) and the SKA. In particular, during the development phase of the SKA, this dynamic, scalable scheduling framework can accommodate changing conditions.

  11. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  12. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    NASA Astrophysics Data System (ADS)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  13. Proceedings of Workshop on Expert Systems for Construction Scheduling Held in Champaign, Illinois on 23-24 March 1987.

    DTIC Science & Technology

    1987-08-01

    TO 8/87 68 6 CUPPEIFMyTARY 0A,()N Copies are available from,. the National Technical Information Service Springfield, VA 22161 *COSATI CODES 18 SUBJECT... information . The first exploratory research step was to determine the breath and depth of the construction schedule analysis domain. This step defined...ADDITIONAL INFORMATION REGARDING THIS RESEARCIH I. O’Connor, Michael J., Jesus M. Dc La Garza, and C. William Ibbs, "An Expert Systcm for Construction

  14. a Quadtree Organization Construction and Scheduling Method for Urban 3d Model Based on Weight

    NASA Astrophysics Data System (ADS)

    Yao, C.; Peng, G.; Song, Y.; Duan, M.

    2017-09-01

    The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.

  15. 49 CFR Appendix D to Part 37 - Construction and Interpretation of Provisions of 49 CFR Part 37

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... service is fixed route, from the train station to a few points in the metropolitan area, with a schedule keyed to the train schedule. It would be regarded as commuter bus service, meaning that accessible... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Pt. 37, App. D Appendix D to Part 37—Construction...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This appendix summarizes building characteristics used to determine heating and cooling loads for each of the five building types in each of the four regions. For the selected five buildings, the following data are attached: new and existing construction characteristics; new and existing construction thermal resistance; floor plan and elevation; people load schedule; lighting load schedule; appliance load schedule; ventilation schedule; and hot water use schedule. For the five building types (single family, apartment buildings, commercial buildings, office buildings, and schools), data are compiled in 10 appendices. These are Building Characteristics; Alternate Energy Sources and Energy Conservation Techniques Description, Costs,more » Fuel Price Scenarios; Life Cycle Cost Model; Simulation Models; Solar Heating/Cooling System; Condensed Weather; Single and Multi-Family Dwelling Characteristics and Energy Conservation Techniques; Mixed Strategies for Energy Conservation and Alternative Energy Utilization in Buildings. An extensive bibliography is given in the final appendix. (MCW)« less

  17. Critical Path Method Networks and Their Use in Claims Analysis.

    DTIC Science & Technology

    1984-01-01

    produced will only be as good as the time invested and the knowledge of the scheduler. A schedule which is based on faulty logic or which contains... fundementals of putting a schedule together but also *how the construction process functions so that the delays can be accurately inserted. When

  18. 41 CFR 101-5.104-4 - Scheduling feasibility studies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... studies. 101-5.104-4 Section 101-5.104-4 Public Contracts and Property Management Federal Property... FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-4 Scheduling feasibility studies. The schedule of feasibility studies will be coordinated by GSA with its construction, space management, and buildings...

  19. 41 CFR 101-5.104-4 - Scheduling feasibility studies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... studies. 101-5.104-4 Section 101-5.104-4 Public Contracts and Property Management Federal Property... FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-4 Scheduling feasibility studies. The schedule of feasibility studies will be coordinated by GSA with its construction, space management, and buildings...

  20. 18 CFR 157.9 - Notice of application and notice of schedule for environmental review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and notice of schedule for environmental review. 157.9 Section 157.9 Conservation of Power and Water... Amended, Concerning Any Operation, Sales, Service, Construction, Extension, Acquisition or Abandonment § 157.9 Notice of application and notice of schedule for environmental review. (a) Notice of each...

  1. Evaluations of Some Scheduling Algorithms for Hard Real-Time Systems

    DTIC Science & Technology

    1990-06-01

    construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules, the...optimal value of Tmax in the preemptive case is at least a lower bound on the optimal Tmax for the nonpreemptive schedules. This principle is the basis...23 b. Nonpreemptable Version .............................................. 24 4. The Minimize Maximum Tardiness with Earliest Start

  2. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  3. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  4. Wireless Sensor Network Metrics for Real-Time Systems

    DTIC Science & Technology

    2009-05-20

    to compute the probability of end-to-end packet delivery as a function of latency, the expected radio energy consumption on the nodes from relaying... schedules for WSNs. Particularly, we focus on the impact scheduling has on path diversity, using short repeating schedules and Greedy Maximal Matching...a greedy algorithm for constructing a mesh routing topology. Finally, we study the implications of using distributed scheduling schemes to generate

  5. 10 CFR Appendix D to Part 2 - Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic Repository. D Appendix D to Part 2 Energy NUCLEAR... for a High-Level Waste Geologic Repository. Day Regulation (10 CFR) Action 0 2.101(f)(8), 2.105(a)(5...

  6. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  7. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  8. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  9. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  10. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  11. Construction machine control guidance implementation strategy.

    DOT National Transportation Integrated Search

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  12. The MICRO-BOSS scheduling system: Current status and future efforts

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman M.

    1993-01-01

    In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule, and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory.

  13. Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Kaplan, Sezgin; Arin, Arif; Rabadi, Ghaith

    2011-01-01

    The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a pproimate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.

  14. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde

  15. Modelling of project cash flow on construction projects in Malang city

    NASA Astrophysics Data System (ADS)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  16. Research on Production Scheduling System with Bottleneck Based on Multi-agent

    NASA Astrophysics Data System (ADS)

    Zhenqiang, Bao; Weiye, Wang; Peng, Wang; Pan, Quanke

    Aimed at the imbalance problem of resource capacity in Production Scheduling System, this paper uses Production Scheduling System based on multi-agent which has been constructed, and combines the dynamic and autonomous of Agent; the bottleneck problem in the scheduling is solved dynamically. Firstly, this paper uses Bottleneck Resource Agent to find out the bottleneck resource in the production line, analyses the inherent mechanism of bottleneck, and describes the production scheduling process based on bottleneck resource. Bottleneck Decomposition Agent harmonizes the relationship of job's arrival time and transfer time in Bottleneck Resource Agent and Non-Bottleneck Resource Agents, therefore, the dynamic scheduling problem is simplified as the single machine scheduling of each resource which takes part in the scheduling. Finally, the dynamic real-time scheduling problem is effectively solved in Production Scheduling System.

  17. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  18. Capability of the Maximax&Maximin selection operator in the evolutionary algorithm for a nurse scheduling problem

    NASA Astrophysics Data System (ADS)

    Ramli, Razamin; Tein, Lim Huai

    2016-08-01

    A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.

  19. A three-stage heuristic for harvest scheduling with access road network development

    Treesearch

    Mark M. Clark; Russell D. Meller; Timothy P. McDonald

    2000-01-01

    In this article we present a new model for the scheduling of forest harvesting with spatial and temporal constraints. Our approach is unique in that we incorporate access road network development into the harvest scheduling selection process. Due to the difficulty of solving the problem optimally, we develop a heuristic that consists of a solution construction stage...

  20. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  1. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  2. Simplified construction scheduling for field personnel.

    DOT National Transportation Integrated Search

    2016-05-01

    The main purpose of this research is to determine the issues that INDOT faces with respect to schedule review/monitoring and determine the best practices by other DOTs in order to suggest improvements to INDOTs practices. Two questionnaire surveys an...

  3. An Optimal Static Scheduling Algorithm for Hard Real-Time Systems Specified in a Prototyping Language

    DTIC Science & Technology

    1989-12-01

    to construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules...the optimal value of T’.. in the preemptive case is at least a lower bound on the optimal T., for the nonpreemptive schedules. This principle is the...adapt to changes in the enviro.nment. In hard real-time systems, tasks are also distinguished as preemptable and nonpreemptable . A task is preemptable

  4. Utilizing Job Camera Technology in Construction Education

    ERIC Educational Resources Information Center

    Bruce, Richard D.; McCandless, David W.; Berryman, Chuck W.; Strong, Shawn D.

    2008-01-01

    One of the toughest hurdles to overcome in construction education is the varying levels of construction field experience among undergraduate students. Although an internship is a common construction management requirement, it is often completed after students complete classes in planning and scheduling. This poses a challenge for the modern…

  5. A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy

    PubMed Central

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments. PMID:23690742

  6. A dynamic scheduling method of Earth-observing satellites by employing rolling horizon strategy.

    PubMed

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments.

  7. Cash transportation vehicle routing and scheduling under stochastic travel times

    NASA Astrophysics Data System (ADS)

    Yan, Shangyao; Wang, Sin-Siang; Chang, Yu-Hsuan

    2014-03-01

    Stochastic disturbances occurring in real-world operations could have a significant influence on the planned routing and scheduling results of cash transportation vehicles. In this study, a time-space network flow technique is utilized to construct a cash transportation vehicle routing and scheduling model incorporating stochastic travel times. In addition, to help security carriers to formulate more flexible routes and schedules, a concept of the similarity of time and space for vehicle routing and scheduling is incorporated into the model. The test results show that the model could be useful for security carriers in actual practice.

  8. The Use of the MASCOT Philosophy for the Construction of Ada Programs,

    DTIC Science & Technology

    1983-10-01

    dependent units must be recompiled. Because of Ada’s commitment to abstract data types tasks are treated as data types with certain restrictions. A task...3.3.3.1.4 End of Slice Action The scheduling algorithm determines, for each type of Slice termination, how the Scheduler treats Activities whose Slice has...Pools. The MASCOT Machine treats them as constructionally equivalent (refer 3.3.1.1.1). Because of the constraints brought in by the formulation of

  9. 40 CFR Table 6 to Subpart Fff of... - Site-Specific Compliance Schedules and Increments of Progress a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...

  10. 40 CFR Table 6 to Subpart Fff of... - Site-Specific Compliance Schedules and Increments of Progress a

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...

  11. Compressed-air energy-storage preliminary design and site-development program in an aquifer. Volume 9: Cost estimate and schedule

    NASA Astrophysics Data System (ADS)

    1982-12-01

    The behavior and suitability of aquifers as compressed-air energy-storage sites is discussed. The engineering and construction schedule, facilities capital-cost estimate, and corresponding cash-flow requirements are given.

  12. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  13. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  14. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  15. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  16. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  17. Construction Management.

    ERIC Educational Resources Information Center

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  18. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    NASA Astrophysics Data System (ADS)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  19. Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency

    NASA Astrophysics Data System (ADS)

    Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.

    2017-11-01

    In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

  20. Advanced construction management for lunar base construction - Surface operations planner

    NASA Technical Reports Server (NTRS)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  1. A Systems Approach to Military Construction.

    DTIC Science & Technology

    1982-11-01

    Unclassi fled I150. OECL ASSI F1C ATI ON/ DOWNGRADING I SCHEDULE IS. DISYR1EUTION STATEMENT (ot this Repo"t) Approved for public release; distribution...30 Procurement Alternatives 30 Design Alternatives 33 Preconcept Control Data 34 AE Selection Procedure 36 Scheduling 40 Cost Estimating 44 4...data, scheduling , and cost estimating. The objectives of project coordination for a systems-oriented project do not differ from those of a

  2. PHENIX Work Breakdown Structure. Cost and schedule review copy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less

  3. Performance and policy dimensions in internet routing

    NASA Technical Reports Server (NTRS)

    Mills, David L.; Boncelet, Charles G.; Elias, John G.; Schragger, Paul A.; Jackson, Alden W.; Thyagarajan, Ajit

    1995-01-01

    The Internet Routing Project, referred to in this report as the 'Highball Project', has been investigating architectures suitable for networks spanning large geographic areas and capable of very high data rates. The Highball network architecture is based on a high speed crossbar switch and an adaptive, distributed, TDMA scheduling algorithm. The scheduling algorithm controls the instantaneous configuration and swell time of the switch, one of which is attached to each node. In order to send a single burst or a multi-burst packet, a reservation request is sent to all nodes. The scheduling algorithm then configures the switches immediately prior to the arrival of each burst, so it can be relayed immediately without requiring local storage. Reservations and housekeeping information are sent using a special broadcast-spanning-tree schedule. Progress to date in the Highball Project includes the design and testing of a suite of scheduling algorithms, construction of software reservation/scheduling simulators, and construction of a strawman hardware and software implementation. A prototype switch controller and timestamp generator have been completed and are in test. Detailed documentation on the algorithms, protocols and experiments conducted are given in various reports and papers published. Abstracts of this literature are included in the bibliography at the end of this report, which serves as an extended executive summary.

  4. Architectural: Construction, Supervision, and Inspection. Course of Study.

    ERIC Educational Resources Information Center

    Robson, Frank

    This architectural course of study is part of a construction, supervision, and inspection series, which provides instructional materials for community or junior college technical courses in the inspection program. Material covered pertains to: construction contracts, schedules, and site preparation; footings and foundations; masonry and…

  5. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  6. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  7. Schedule and status of irradiation experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-09-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has one irradiation experiment in reactor and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  8. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a... ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions... a schedule the State accepts and such schedule is inserted as a special condition of the grant...

  9. Title I preliminary engineering for: A. S. E. F. solid waste to methane gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-01-01

    An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less

  10. The MICRO-BOSS scheduling system: Current status and future efforts

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman M.

    1992-01-01

    In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory. Current research efforts include: adaptation of MICRO-BOSS to deal with sequence-dependent setups and development of micro-opportunistic reactive scheduling techniques that will enable the system to patch the schedule in the presence of contingencies such as machine breakdowns, raw materials arriving late, job cancellations, etc.

  11. Analysis and design of gain scheduled control systems. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.

    1988-01-01

    Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.

  12. 10 CFR Appendix D to Part 2 - Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construction Authorization for a High-Level Waste Geologic Repository. D Appendix D to Part 2 Energy NUCLEAR... the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic... Completion of NMSS and Commission supervisory review; issuance of construction authorization; NWPA 3-year...

  13. 10 CFR Appendix D to Part 2 - Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Construction Authorization for a High-Level Waste Geologic Repository. D Appendix D to Part 2 Energy NUCLEAR... the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic... Completion of NMSS and Commission supervisory review; issuance of construction authorization; NWPA 3-year...

  14. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  15. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    PubMed

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  16. Corrosion characteristics of post-tensioning strands in ungrouted ducts : summary.

    DOT National Transportation Integrated Search

    2011-01-01

    To prevent corrosion of post-tensioning strands, FDOT construction specifications currently require post-tensioning ducts to be grouted within seven calendar days of strand installation. This period challenges construction schedules on large projects...

  17. Accommodating to Restrictions on Residents' Working Hours.

    ERIC Educational Resources Information Center

    Foster, Henry W., Jr.; Seltzer, Vicki L.

    1991-01-01

    In response to New York State legislation limiting house staff working hours, a survey of obstetrics and gynecology resident programs (n=26) was conducted. Results were used to construct a prototype call schedule and a hypothetical monthly schedule indicating how a single resident would function without violating any state regulations. (MSE)

  18. 75 FR 12535 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ...: Day County Wind, LLC. Description: Day County Wind, LLC submits application for authorization to make... revised pages to Schedule Q of the WSPP Agreement to update the cost-based rate schedule of Arizona Public... Facilities Construction Agreement among Otter Tail Power Company et al. Filed Date: 03/04/2010. Accession...

  19. Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.

  20. Toward an understanding of the impact of production pressure on safety performance in construction operations.

    PubMed

    Han, Sanguk; Saba, Farzaneh; Lee, Sanghyun; Mohamed, Yasser; Peña-Mora, Feniosky

    2014-07-01

    It is not unusual to observe that actual schedule and quality performances are different from planned performances (e.g., schedule delay and rework) during a construction project. Such differences often result in production pressure (e.g., being pressed to work faster). Previous studies demonstrated that such production pressure negatively affects safety performance. However, the process by which production pressure influences safety performance, and to what extent, has not been fully investigated. As a result, the impact of production pressure has not been incorporated much into safety management in practice. In an effort to address this issue, this paper examines how production pressure relates to safety performance over time by identifying their feedback processes. A conceptual causal loop diagram is created to identify the relationship between schedule and quality performances (e.g., schedule delays and rework) and the components related to a safety program (e.g., workers' perceptions of safety, safety training, safety supervision, and crew size). A case study is then experimentally undertaken to investigate this relationship with accident occurrence with the use of data collected from a construction site; the case study is used to build a System Dynamics (SD) model. The SD model, then, is validated through inequality statistics analysis. Sensitivity analysis and statistical screening techniques further permit an evaluation of the impact of the managerial components on accident occurrence. The results of the case study indicate that schedule delays and rework are the critical factors affecting accident occurrence for the monitored project. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

  2. Construction in Occupied Spaces

    NASA Astrophysics Data System (ADS)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  3. A Human-Centered Smart Home System with Wearable-Sensor Behavior Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ji, Jianting; Liu, Ting; Shen, Chao

    Smart home has recently attracted much research interest owing to its potential in improving the quality of human life. How to obtain user's demand is the most important and challenging task for appliance optimal scheduling in smart home, since it is highly related to user's unpredictable behavior. In this paper, a human-centered smart home system is proposed to identify user behavior, predict their demand and schedule the household appliances. Firstly, the sensor data from user's wearable devices are monitored to profile user's full-day behavior. Then, the appliance-demand matrix is constructed to predict user's demand on home environment, which is extractedmore » from the history of appliance load data and user behavior. Two simulations are designed to demonstrate user behavior identification, appliance-demand matrix construction and strategy of appliance optimal scheduling generation.« less

  4. An application of artificial intelligence to automatic telescopes

    NASA Technical Reports Server (NTRS)

    Swanson, Keith; Drummond, Mark; Bresina, John

    1992-01-01

    Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.

  5. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  6. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  7. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... Road on Midvale Boulevard to Summit Road. Stage 1 is currently scheduled for construction from... for construction from approximately 2017 to 2018. Stage 3 will be constructed when operations and...

  8. 24 CFR 990.145 - Dwelling units with approved vacancies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... work, and the construction is on schedule according to a HUD-approved PHA Annual Plan; or (ii) The unit... PHA Annual Plan, but the time period for placing the vacant unit under construction has not yet expired. The PHA shall place the vacant unit under construction within two federal fiscal years (FFYs...

  9. 40 CFR 60.1140 - Where and when must I hold a public meeting on the siting analysis?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... will construct your municipal waste combustion unit. (c) You must schedule the public meeting to occur...

  10. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  11. Modeling Off-Nominal Recovery in NextGen Terminal-Area Operations

    NASA Technical Reports Server (NTRS)

    Callantine, Todd J.

    2011-01-01

    Robust schedule-based arrival management requires efficient recovery from off-nominal situations. This paper presents research on modeling off-nominal situations and plans for recovering from them using TRAC, a route/airspace design, fast-time simulation, and analysis tool for studying NextGen trajectory-based operations. The paper provides an overview of a schedule-based arrival-management concept and supporting controller tools, then describes TRAC implementations of methods for constructing off-nominal scenarios, generating trajectory options to meet scheduling constraints, and automatically producing recovery plans.

  12. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  13. A novel discrete PSO algorithm for solving job shop scheduling problem to minimize makespan

    NASA Astrophysics Data System (ADS)

    Rameshkumar, K.; Rajendran, C.

    2018-02-01

    In this work, a discrete version of PSO algorithm is proposed to minimize the makespan of a job-shop. A novel schedule builder has been utilized to generate active schedules. The discrete PSO is tested using well known benchmark problems available in the literature. The solution produced by the proposed algorithms is compared with best known solution published in the literature and also compared with hybrid particle swarm algorithm and variable neighborhood search PSO algorithm. The solution construction methodology adopted in this study is found to be effective in producing good quality solutions for the various benchmark job-shop scheduling problems.

  14. Discrete Bat Algorithm for Optimal Problem of Permutation Flow Shop Scheduling

    PubMed Central

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem. PMID:25243220

  15. Discrete bat algorithm for optimal problem of permutation flow shop scheduling.

    PubMed

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem.

  16. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    DTIC Science & Technology

    2013-03-01

    Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research

  17. A method of operation scheduling based on video transcoding for cluster equipment

    NASA Astrophysics Data System (ADS)

    Zhou, Haojie; Yan, Chun

    2018-04-01

    Because of the cluster technology in real-time video transcoding device, the application of facing the massive growth in the number of video assignments and resolution and bit rate of diversity, task scheduling algorithm, and analyze the current mainstream of cluster for real-time video transcoding equipment characteristics of the cluster, combination with the characteristics of the cluster equipment task delay scheduling algorithm is proposed. This algorithm enables the cluster to get better performance in the generation of the job queue and the lower part of the job queue when receiving the operation instruction. In the end, a small real-time video transcode cluster is constructed to analyze the calculation ability, running time, resource occupation and other aspects of various algorithms in operation scheduling. The experimental results show that compared with traditional clustering task scheduling algorithm, task delay scheduling algorithm has more flexible and efficient characteristics.

  18. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  19. Scheduling nursing personnel on a microcomputer.

    PubMed

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  20. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  1. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  3. 28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-154. MOBILIZATION BUILDINGS; STANDARD DOOR DETAILS; TYPES SCHEDULES & DETAILS. (This photograph was copied from a drawing at Fort McCoy. There is no negative of this drawing in the Military Construction 105mm. Negative Collection at Fort Belvoir.) - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  4. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    PubMed

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  5. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... event; (2) The duration of the delay in the schedule for construction, testing and full power operation... and full power operation, including the dates of system level construction or testing that had been... information is accurate and complete to the sponsor's knowledge and belief. ...

  6. Investigating the feasibility of using quick response codes in highway construction for document control.

    DOT National Transportation Integrated Search

    2015-07-01

    Highway construction takes place in remote locations, making document control challenging. Frequent changes in a project can cause errors, : reworks, and schedule delays due to the time taken to disseminate these changes to the field or due to using ...

  7. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  8. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  10. FlexTech{trademark}

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilhelm, B.

    1996-12-31

    Information is presented on a 110 MWe atmospheric CFB located in the Czech Republic firing brown coal. The following topics are discussed: fuel analysis; boiler design parameters; CFB fluidizing nozzle; and project time schedule. Information is also given on a 200 MWe atmospheric CFB located in the Republic of Korea firing Korean anthracite. Data are presented on fuel specifications; predicted performance; and engineering and construction schedule.

  11. Policy Considerations in Conversion to Year-Round Schools. Policy Briefs of the Education Policy Studies Laboratory, No. 92-01.

    ERIC Educational Resources Information Center

    Glass, Gene V.

    Increasing enrollments and budget problems have prompted many school districts nationwide to experiment with year-round school schedules. Year-round school schedules allow districts to serve more students without constructing more buildings. As in traditional 9-month schools, students in year-round schools attend classes about 180 days a year. The…

  12. Scheduling on the basis of the research of dependences among the construction process parameters

    NASA Astrophysics Data System (ADS)

    Romanovich, Marina; Ermakov, Alexander; Mukhamedzhanova, Olga

    2017-10-01

    The dependences among the construction process parameters are investigated in the article: average integrated value of qualification of the shift, number of workers per shift and average daily amount of completed work on the basis of correlation coefficient are considered. Basic data for the research of dependences among the above-stated parameters have been collected during the construction of two standard objects A and B (monolithic houses), in four months of construction (October, November, December, January). Kobb-Douglas production function has proved the values of coefficients of correlation close to 1. Function is simple to be used and is ideal for the description of the considered dependences. The development function, describing communication among the considered parameters of the construction process, is developed. The function of the development gives the chance to select optimum quantitative and qualitative (qualification) structure of the brigade link for the work during the next period of time, according to a preset value of amount of works. Function of the optimized amounts of works, which reflects interrelation of key parameters of construction process, is developed. Values of function of the optimized amounts of works should be used as the average standard for scheduling of the storming periods of construction.

  13. Sustainable Design of EPA's Campus in Research Triangle Park, NC—Environmental Performance Specifications in Construction Contracts—Section 01450 Sequence of Finishes Installation

    EPA Pesticide Factsheets

    Learn more about the special construction scheduling/sequencing requirements and procedures necessary to assure achievement of designed Indoor Air Quality (IAQ) levels for the completed project required by the EPA IAQ Program.

  14. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  15. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  16. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  17. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  18. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  19. General Construction. Instructor Manual.

    ERIC Educational Resources Information Center

    Laborers-AGC Education and Training Fund, Pomfret Center, CT.

    This guide contains materials for a general construction course. Introductory materials include a list of videos, schedule for the 10-day course, and tools and material list. The course is divided into 10 sections. Each section consists of some or all of these components: list of trainee objectives, instructor notes, instructor outline,…

  20. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  1. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  2. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  3. 7 CFR 1753.8 - Contract construction procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of all bids including “Buy American” evaluations, if any, and all other evaluations required by law... Contract construction procedures. (a) Sealed, competitive bidding—(1) Bid opening date. The borrower is responsible for scheduling the bid opening date. If RUS review of P&S is required by § 1753.7, the borrower...

  4. An Optimal CDS Construction Algorithm with Activity Scheduling in Ad Hoc Networks

    PubMed Central

    Penumalli, Chakradhar; Palanichamy, Yogesh

    2015-01-01

    A new energy efficient optimal Connected Dominating Set (CDS) algorithm with activity scheduling for mobile ad hoc networks (MANETs) is proposed. This algorithm achieves energy efficiency by minimizing the Broadcast Storm Problem [BSP] and at the same time considering the node's remaining energy. The Connected Dominating Set is widely used as a virtual backbone or spine in mobile ad hoc networks [MANETs] or Wireless Sensor Networks [WSN]. The CDS of a graph representing a network has a significant impact on an efficient design of routing protocol in wireless networks. Here the CDS is a distributed algorithm with activity scheduling based on unit disk graph [UDG]. The node's mobility and residual energy (RE) are considered as parameters in the construction of stable optimal energy efficient CDS. The performance is evaluated at various node densities, various transmission ranges, and mobility rates. The theoretical analysis and simulation results of this algorithm are also presented which yield better results. PMID:26221627

  5. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  6. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  7. LPV Controller Interpolation for Improved Gain-Scheduling Control Performance

    NASA Technical Reports Server (NTRS)

    Wu, Fen; Kim, SungWan

    2002-01-01

    In this paper, a new gain-scheduling control design approach is proposed by combining LPV (linear parameter-varying) control theory with interpolation techniques. The improvement of gain-scheduled controllers can be achieved from local synthesis of Lyapunov functions and continuous construction of a global Lyapunov function by interpolation. It has been shown that this combined LPV control design scheme is capable of improving closed-loop performance derived from local performance improvement. The gain of the LPV controller will also change continuously across parameter space. The advantages of the newly proposed LPV control is demonstrated through a detailed AMB controller design example.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less

  9. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  10. Block scheduling: Instructional practices in high school science classrooms

    NASA Astrophysics Data System (ADS)

    Richelsoph, Barry

    Proponents of block scheduling perceive this approach to be a 'structural lever' to invite and impel teachers to change their teaching (Marshak, 1997). This desired shift is supposed to be manifest in movement from the traditional classroom structure, focusing on the teacher as lecturer or transmitter of subject matter, to that of teacher as coach with students as active learners, engaged in a variety of activities involving them individually and collaboratively in their education (Canady & Rettig, 1995). Block scheduling changes the formal structure of the school day, but does it really change pedagogical practices in high school science classrooms? Fraser's Individualized Classroom Environment Questionnaire (ICEQ) the instrument used in this study of science classes in five block-scheduled high schools in Connecticut, incorporates the tenets for an enriched classroom environment in its five scales or constructs: Participation---Extent to which students are encouraged to participate rather than be passive learners; Personalization---Emphasis on opportunities for individual students to interact with the teacher and on concern for the personal welfare and social growth of the individual; Investigation---Emphasis on the skills and processes of inquiry and their use in problem solving and investigation. Independence---Extent to which students are allowed to make decisions and have control over their own learning environment and behavior; Differentiation---Emphasis on the selective treatment of students on the basis of ability, learning style, interests, and rate of working (Fraser, 1990). The results and conclusions from this research study suggested that the block-scheduled high school science classes that participated in this research do promote, to varying degrees, those tenets that define an enriched classroom environment. Both the teachers and their classes of students perceived opportunities for Participation, Personalization, and Investigation constructs as prevalent in science instruction. However, Independence and Differentiation, although existent to some extent, were perceived to occur less by both the teachers and the students in their classes. The provision of more class time alone was not enough to drive the tenets of these two constructs significantly.

  11. Consumption-leisure tradeoffs in pigeons: Effects of changing marginal wage rates by varying amount of reinforcement.

    PubMed

    Green, L; Kagel, J H; Battalio, R C

    1987-01-01

    Pigeons' rates of responding and food reinforcement under simple random-ratio schedules were compared with those obtained under comparable ratio schedules in which free food deliveries were added, but the duration of each food delivery was halved. These ratio-with-free-food schedules were constructed so that, were the pigeon to maintain the same rate of responding as it had under the simple ratio schedule, total food obtained (earned plus free) would remain unchanged. However, any reduction in responding would reduce total food consumption below that under the simple ratio schedule. These "compensated wage decreases" led to decreases in responding and decreases in food consumption, as predicted by an economic model of labor supply. Moreover, the reductions in responding increased as the ratio value increased (i.e., as wage rates decreased). Pigeons, therefore, substituted leisure for consumption. The relationship between these procedures and negative-income-tax programs is noted.

  12. Developing algorithm for the critical care physician scheduling

    NASA Astrophysics Data System (ADS)

    Lee, Hyojun; Pah, Adam; Amaral, Luis; Northwestern Memorial Hospital Collaboration

    Understanding the social network has enabled us to quantitatively study social phenomena such as behaviors in adoption and propagation of information. However, most work has been focusing on networks of large heterogeneous communities, and little attention has been paid to how work-relevant information spreads within networks of small and homogeneous groups of highly trained individuals, such as physicians. Within the professionals, the behavior patterns and the transmission of information relevant to the job are dependent not only on the social network between the employees but also on the schedules and teams that work together. In order to systematically investigate the dependence of the spread of ideas and adoption of innovations on a work-environment network, we sought to construct a model for the interaction network of critical care physicians at Northwestern Memorial Hospital (NMH) based on their work schedules. We inferred patterns and hidden rules from past work schedules such as turnover rates. Using the characteristics of the work schedules of the physicians and their turnover rates, we were able to create multi-year synthetic work schedules for a generic intensive care unit. The algorithm for creating shift schedules can be applied to other schedule dependent networks ARO1.

  13. THE CONSTRUCTION AND VALIDATION OF A MEASURE OF VOCATIONAL MATURITY.

    ERIC Educational Resources Information Center

    CLARY, JOE R.; WESTBROOK, BERT W.

    THIS REPORT DEALS WITH THE ORGANIZATION, RATIONALE, METHODS AND EXPECTED END-PRODUCTS OF A RESEARCH PROJECT (SCHEDULED FOR COMPLETION ON JUNE 23, 1970) FOR THE CONSTRUCTION AND VALIDATION OF A RELIABLE VOCATIONAL MATURITY MEASURE (VMM). THE PROJECT'S EIGHT PHASES AND ACTIVITIES ARE EXPLAINED. THE PROJECT ASSUMES--(1) THE INDIVIDUAL AND SOCIETY AS…

  14. Constructing lightning towers for the Constellation Program and

    NASA Image and Video Library

    2007-11-09

    On Launch Pad 39B at NASA's Kennedy Space Center, pilings are being pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  15. Constructing lightning towers for the Constellation Program and

    NASA Image and Video Library

    2007-11-09

    On Launch Pad 39B at NASA's Kennedy Space Center, workers measure the piling being pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  16. 40 CFR 62.14575 - What must I do if I close my CISWI unit and then restart it?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of... retrofit construction of control devices so that when the affected CISWI unit is brought online, all...

  17. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  18. 8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 22 of 148; file no. 1320/73. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  19. Observing with HST V: Improvements to the Scheduling of HST Parallel Observations

    NASA Astrophysics Data System (ADS)

    Taylor, D. K.; Vanorsow, D.; Lucks, M.; Henry, R.; Ratnatunga, K.; Patterson, A.

    1994-12-01

    Recent improvements to the Hubble Space Telescope (HST) ground system have significantly increased the frequency of pure parallel observations, i.e. the simultaneous use of multiple HST instruments by different observers. Opportunities for parallel observations are limited by a variety of timing, hardware, and scientific constraints. Formerly, such opportunities were heuristically predicted prior to the construction of the primary schedule (or calendar), and lack of complete information resulted in high rates of scheduling failures and missed opportunities. In the current process the search for parallel opportunities is delayed until the primary schedule is complete, at which point new software tools are employed to identify places where parallel observations are supported. The result has been a considerable increase in parallel throughput. A new technique, known as ``parallel crafting,'' is currently under development to streamline further the parallel scheduling process. This radically new method will replace the standard exposure logsheet with a set of abstract rules from which observation parameters will be constructed ``on the fly'' to best match the constraints of the parallel opportunity. Currently, parallel observers must specify a huge (and highly redundant) set of exposure types in order to cover all possible types of parallel opportunities. Crafting rules permit the observer to express timing, filter, and splitting preferences in a far more succinct manner. The issue of coordinated parallel observations (same PI using different instruments simultaneously), long a troublesome aspect of the ground system, is also being addressed. For Cycle 5, the Phase II Proposal Instructions now have an exposure-level PAR WITH special requirement. While only the primary's alignment will be scheduled on the calendar, new commanding will provide for parallel exposures with both instruments.

  20. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    NASA Astrophysics Data System (ADS)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  1. U.S. Geological Survey Library classification system

    USGS Publications Warehouse

    Sasscer, R. Scott

    2000-01-01

    The U.S. Geological Survey Library classification system has been designed for earth science libraries. It is a tool for assigning call numbers to earth science and allied pure science materials in order to collect these materials into related subject groups on the library shelves and arrange them alphabetically by author and title. The classification can be used as a retrieval system to access materials through the subject and geographic numbers.The classification scheme has been developed over the years since 1904 to meet the ever-changing needs of increased specialization and the development of new areas of research in the earth sciences. The system contains seven schedules: Subject scheduleGeological survey schedule Earth science periodical scheduleGovernment document periodical scheduleGeneral science periodical schedule Earth science map schedule Geographic schedule Introduction provides detailed instructions on the construction of call numbers for works falling into the framework of the classification schedules.The tables following the introduction can be quickly accessed through the use of the newly expanded subject index.The purpose of this publication is to provide the earth science community with a classification and retrieval system for earth science materials, to offer sufficient explanation of its structure and use, and to enable library staff and clientele to classify or access research materials in a library collection.

  2. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  3. On program restructuring, scheduling, and communication for parallel processor systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, thesemore » algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.« less

  4. Solomon Gulch hydroelectric project takes shape

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)

  5. Construction Management Activities of Governmental Agencies in the New England Area During the Construction Phase.

    DTIC Science & Technology

    1980-02-01

    automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined

  6. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  7. Education of a model student.

    PubMed

    Novikoff, Timothy P; Kleinberg, Jon M; Strogatz, Steven H

    2012-02-07

    A dilemma faced by teachers, and increasingly by designers of educational software, is the trade-off between teaching new material and reviewing what has already been taught. Complicating matters, review is useful only if it is neither too soon nor too late. Moreover, different students need to review at different rates. We present a mathematical model that captures these issues in idealized form. The student's needs are modeled as constraints on the schedule according to which educational material and review are spaced over time. Our results include algorithms to construct schedules that adhere to various spacing constraints, and bounds on the rate at which new material can be introduced under these schedules.

  8. Satellite power systems (SPS) concept definition study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    System definition studies resulted in a further definition of the reference system using gallium arsenide solar arrays, analysis of alternative subsystem options for the reference concept, preliminary solid state microwave concept studies, and an environmental analysis of laser transmission systems. The special emphasis studies concentrated on satellite construction, satellite construction base definition, satellite construction base construction, and rectenna construction. Major emphasis in the transportation studies was put on definition of a two stage parallel burn, vertical takeoff/horizontal landing concept. The electric orbit transfer vehicle was defined in greater detail. Program definition included cost analyses and schedule definition.

  9. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. 18.95 Section 18.95..., accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. Machines for which field approval... 2D, 2E, 2F, or 2G, shall be approved following a determination by the electrical representative that...

  10. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. 18.95 Section 18.95..., accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. Machines for which field approval... 2D, 2E, 2F, or 2G, shall be approved following a determination by the electrical representative that...

  11. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. 18.95 Section 18.95..., accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. Machines for which field approval... 2D, 2E, 2F, or 2G, shall be approved following a determination by the electrical representative that...

  12. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. 18.95 Section 18.95..., accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. Machines for which field approval... 2D, 2E, 2F, or 2G, shall be approved following a determination by the electrical representative that...

  13. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. 18.95 Section 18.95..., accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G. Machines for which field approval... 2D, 2E, 2F, or 2G, shall be approved following a determination by the electrical representative that...

  14. Big Creek Flood Control Project, Cleveland, Ohio. Phase II. General Design Memorandum.

    DTIC Science & Technology

    1979-08-01

    enviromental measure to -minii polluted leachate, if say, from flowing down the embashment. 1. Comnt 12(a). The freboard on the chute will be revised...cost ratio); (3) operational dependability; and (4) socio -environmental effects, including external damage effects. Each of these alternative plans is...schedule for the utility relocations will not be in conflict with the construction schedule for the major components of the project outlined above. 112

  15. Air Force Civil Engineer, Volume 9, Number 1, Spring 2001

    DTIC Science & Technology

    2001-01-01

    generated some important lessons learned. The Gulf War was a wakeup call for contingency training. When it began, many in CE had never trained on bare...square foot, corrosion control facility at Charleston Air Force Base, S.C. Construction is scheduled for comple- tion in early 2002. The facility is...Rhein Main Transition Program. This program, scheduled for completion in 2005, transfers operational capability from Rhein Main AB to Spangdahlem and

  16. 7. Photographic copy of construction drawing, dated January 10, 1962, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing, dated January 10, 1962, Department of the Air Force Air Defense Command Installations for Selfridge, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL PLAN AND SCHEDULES, SLF 140-056, SHEET 2 OF 7. - Selfridge Field, Building No. 562, Ammo Road northeast of Taxiway A, Mount Clemens, Macomb County, MI

  17. Building a Solar System Internet

    NASA Technical Reports Server (NTRS)

    Clark, Gilbert J.

    2018-01-01

    This presentation is expected to be given during the scheduled Communications Technology and Development discussion in the University Student Design Challenge (2). It is an introduction to various challenges inherent to the construction of networks in space. The presentation also includes both an overview of networking in general, as well as approaches taken to the construction of delay- and disruption- tolerant networks.

  18. Constructing lightning towers for the Constellation Program and

    NASA Image and Video Library

    2007-11-09

    On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler puts a piling into place to be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  19. Constructing lightning towers for the Constellation Program and

    NASA Image and Video Library

    2007-11-09

    On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler lifts a piling into place to be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  20. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  1. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  2. 40 CFR Table 3 to Subpart Ggg of... - Generic Compliance Schedule and Increments of Progress a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... rate report showing NMOC emissions ≥ 50 Mg/yr.b Increment 3—Begin on-site construction 24 months after...

  3. 40 CFR Table 3 to Subpart Ggg of... - Generic Compliance Schedule and Increments of Progress a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... rate report showing NMOC emissions ≥ 50 Mg/yr.b Increment 3—Begin on-site construction 24 months after...

  4. Artificial intelligence for the CTA Observatory scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint Propagation techniques. A simulation platform, an analysis tool and different test case scenarios for CTA were developed to test the performance of the scheduler and are also described.

  5. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    NASA Astrophysics Data System (ADS)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  6. Real-Time MENTAT programming language and architecture

    NASA Technical Reports Server (NTRS)

    Grimshaw, Andrew S.; Silberman, Ami; Liu, Jane W. S.

    1989-01-01

    Real-time MENTAT, a programming environment designed to simplify the task of programming real-time applications in distributed and parallel environments, is described. It is based on the same data-driven computation model and object-oriented programming paradigm as MENTAT. It provides an easy-to-use mechanism to exploit parallelism, language constructs for the expression and enforcement of timing constraints, and run-time support for scheduling and exciting real-time programs. The real-time MENTAT programming language is an extended C++. The extensions are added to facilitate automatic detection of data flow and generation of data flow graphs, to express the timing constraints of individual granules of computation, and to provide scheduling directives for the runtime system. A high-level view of the real-time MENTAT system architecture and programming language constructs is provided.

  7. Vehicle yaw stability control via H∞ gain scheduling

    NASA Astrophysics Data System (ADS)

    Zhang, Jinhua; Sun, Weichao; Feng, Zhiguang

    2018-06-01

    Yaw stability control (YSC) is rather significant in a vehicle lateral motion, since it can considerably reduce casualties caused by vehicle instability. Nevertheless with the vehicle running, the parameters, such as vehicle mass and moment of inertial, can be perturbed because of variation of capacity, loadage and consumption of fuel, hence some of nominal controllers cannot always work satisfactorily. To overcome the aforementioned deficiency, a gain scheduled H∞ YSC controller is developed in this paper, taking the vehicle mass and moment of inertial as the scheduled variables, now that the gain scheduled H∞ controller can guarantee both the robustness against parameter perturbation and the adjustability of tracking accuracy. Then the constructed controller is verified via numerical simulation and MATLAB-CarSim coalition simulation. The simulation results indicate that the designed controller can indeed improve the vehicle handing performance under circumstance of lateral stability.

  8. PLAN-IT-2: The next generation planning and scheduling tool

    NASA Technical Reports Server (NTRS)

    Eggemeyer, William C.; Cruz, Jennifer W.

    1990-01-01

    PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

  9. Constructing lightning towers for the Constellation Program and

    NASA Image and Video Library

    2007-11-09

    On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler lifts a piling off a truck. The piling will be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  10. The 1988 Inland Waterway Review

    DTIC Science & Technology

    1988-11-01

    Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act

  11. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  12. Education of a model student

    PubMed Central

    Novikoff, Timothy P.; Kleinberg, Jon M.; Strogatz, Steven H.

    2012-01-01

    A dilemma faced by teachers, and increasingly by designers of educational software, is the trade-off between teaching new material and reviewing what has already been taught. Complicating matters, review is useful only if it is neither too soon nor too late. Moreover, different students need to review at different rates. We present a mathematical model that captures these issues in idealized form. The student’s needs are modeled as constraints on the schedule according to which educational material and review are spaced over time. Our results include algorithms to construct schedules that adhere to various spacing constraints, and bounds on the rate at which new material can be introduced under these schedules. PMID:22308334

  13. JIGSAW: Preference-directed, co-operative scheduling

    NASA Technical Reports Server (NTRS)

    Linden, Theodore A.; Gaw, David

    1992-01-01

    Techniques that enable humans and machines to cooperate in the solution of complex scheduling problems have evolved out of work on the daily allocation and scheduling of Tactical Air Force resources. A generalized, formal model of these applied techniques is being developed. It is called JIGSAW by analogy with the multi-agent, constructive process used when solving jigsaw puzzles. JIGSAW begins from this analogy and extends it by propagating local preferences into global statistics that dynamically influence the value and variable ordering decisions. The statistical projections also apply to abstract resources and time periods--allowing more opportunities to find a successful variable ordering by reserving abstract resources and deferring the choice of a specific resource or time period.

  14. Moving Equipment and Workers to Mine Construction Site at a Logistically Challenged Area

    NASA Astrophysics Data System (ADS)

    Tikasz, Laszlo; Biroscak, Dennis; Pentiah, Scheale Duvah; McCulloch, Robert I.

    Social sensitivity of habitants, minimal impact on the environment, low-grade infrastructure, high altitude, frequent rock slides combined with expectations for the timely moving of equipment and workers are some of the challenges emerging from the current construction of a mine. Starting with traditional planning, and experiencing issues in the early phase of the construction, a traffic simulator was requested by the Procurement Department in order to validate daily-weekly schedules and predict likely delays or blockages on the long-term.

  15. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  16. Simulation of Etching in Chlorine Discharges Using an Integrated Feature Evolution-Plasma Model

    NASA Technical Reports Server (NTRS)

    Hwang, Helen H.; Bose, Deepak; Govindan, T. R.; Meyyappan, M.; Biegel, Bryan (Technical Monitor)

    2002-01-01

    To better utilize its vast collection of heterogeneous resources that are geographically distributed across the United States, NASA is constructing a computational grid called the Information Power Grid (IPG). This paper describes various tools and techniques that we are developing to measure and improve the performance of a broad class of NASA applications when run on the IPG. In particular, we are investigating the areas of grid benchmarking, grid monitoring, user-level application scheduling, and decentralized system-level scheduling.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Russell, J.S.

    Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less

  18. 40 CFR 62.14540 - When must I complete each increment of progress?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  19. 40 CFR 62.14540 - When must I complete each increment of progress?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  20. Convoy projects: a case study from Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gruener, W.

    The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less

  1. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  2. Optimal updating magnitude in adaptive flat-distribution sampling

    NASA Astrophysics Data System (ADS)

    Zhang, Cheng; Drake, Justin A.; Ma, Jianpeng; Pettitt, B. Montgomery

    2017-11-01

    We present a study on the optimization of the updating magnitude for a class of free energy methods based on flat-distribution sampling, including the Wang-Landau (WL) algorithm and metadynamics. These methods rely on adaptive construction of a bias potential that offsets the potential of mean force by histogram-based updates. The convergence of the bias potential can be improved by decreasing the updating magnitude with an optimal schedule. We show that while the asymptotically optimal schedule for the single-bin updating scheme (commonly used in the WL algorithm) is given by the known inverse-time formula, that for the Gaussian updating scheme (commonly used in metadynamics) is often more complex. We further show that the single-bin updating scheme is optimal for very long simulations, and it can be generalized to a class of bandpass updating schemes that are similarly optimal. These bandpass updating schemes target only a few long-range distribution modes and their optimal schedule is also given by the inverse-time formula. Constructed from orthogonal polynomials, the bandpass updating schemes generalize the WL and Langfeld-Lucini-Rago algorithms as an automatic parameter tuning scheme for umbrella sampling.

  3. Optimal updating magnitude in adaptive flat-distribution sampling.

    PubMed

    Zhang, Cheng; Drake, Justin A; Ma, Jianpeng; Pettitt, B Montgomery

    2017-11-07

    We present a study on the optimization of the updating magnitude for a class of free energy methods based on flat-distribution sampling, including the Wang-Landau (WL) algorithm and metadynamics. These methods rely on adaptive construction of a bias potential that offsets the potential of mean force by histogram-based updates. The convergence of the bias potential can be improved by decreasing the updating magnitude with an optimal schedule. We show that while the asymptotically optimal schedule for the single-bin updating scheme (commonly used in the WL algorithm) is given by the known inverse-time formula, that for the Gaussian updating scheme (commonly used in metadynamics) is often more complex. We further show that the single-bin updating scheme is optimal for very long simulations, and it can be generalized to a class of bandpass updating schemes that are similarly optimal. These bandpass updating schemes target only a few long-range distribution modes and their optimal schedule is also given by the inverse-time formula. Constructed from orthogonal polynomials, the bandpass updating schemes generalize the WL and Langfeld-Lucini-Rago algorithms as an automatic parameter tuning scheme for umbrella sampling.

  4. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    NASA Astrophysics Data System (ADS)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  5. Parallel software support for computational structural mechanics

    NASA Technical Reports Server (NTRS)

    Jordan, Harry F.

    1987-01-01

    The application of the parallel programming methodology known as the Force was conducted. Two application issues were addressed. The first involves the efficiency of the implementation and its completeness in terms of satisfying the needs of other researchers implementing parallel algorithms. Support for, and interaction with, other Computational Structural Mechanics (CSM) researchers using the Force was the main issue, but some independent investigation of the Barrier construct, which is extremely important to overall performance, was also undertaken. Another efficiency issue which was addressed was that of relaxing the strong synchronization condition imposed on the self-scheduled parallel DO loop. The Force was extended by the addition of logical conditions to the cases of a parallel case construct and by the inclusion of a self-scheduled version of this construct. The second issue involved applying the Force to the parallelization of finite element codes such as those found in the NICE/SPAR testbed system. One of the more difficult problems encountered is the determination of what information in COMMON blocks is actually used outside of a subroutine and when a subroutine uses a COMMON block merely as scratch storage for internal temporary results.

  6. Project safety as a sustainable competitive advantage.

    PubMed

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  7. U. S. fusion programs: Struggling to stay in the game

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, M.

    Funding for the US fusion energy program has suffered and will probably continue to suffer major cuts. A committee hand-picked by Energy Secretary James Watkins urged the Department of Energy to mount an aggressive program to develop fusion power, but congress cut funding from $323 million in 1990 to $275 million in 1991. This portends dire conditions for fusion research and development. Projects to receive top priority are concerned with the tokamaks and to keep the next big machine, the Burning Plasma Experiment, scheduled for beginning of construction in 1993 on schedule. Secretary Watkins is said to want to keepmore » the International Thermonuclear Energy Reactor (ITER) on schedule. ITER would follow the Burning Plasma Experiment.« less

  8. C/SCSC overview: approach, implementation, use. [Cost/Schedule Control Systems Criteria

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turf, Larry

    1979-01-01

    An overview of the Cost/Schedule Control System Criteria, known as C/SCS or C/S Squared is pesented. In the mid-1960s, several DOD service agencies embarked on a new performance measurement concept to track cost and schedule performance on major DOD programs. The performance measurement concept of C/SCS has expanded from DOD use to the Department of Energy (PMS), NASA (533 reports), and private industry such as shipbuilding, utilities, and construction. This paper describes the C/SCSC with the events leading to the C/SCS requirement, how to approach the requirement, and discusses implementing and using the system. Many government publications, directives, and instructionsmore » on the subject are listed in the publication.« less

  9. An Evaluation of the ROSE System

    NASA Technical Reports Server (NTRS)

    Usher, John M.

    2002-01-01

    A request-oriented scheduling engine, better known as ROSE, is under development within the Flight Projects Directorate for the purpose of planning and scheduling of the activities and resources associated with the science experiments to be performed aboard the International Space Station (ISS). ROSE is being designed to incrementally process requests from payload developers (PDs) to model and schedule the execution of their science experiments on the ISS. The novelty of the approach comes from its web-based interface permitting the PDs to define their request via the construction of a graphical model to represent their requirements. Based on an examination of the current ROSE implementation, this paper proposes several recommendations for changes to the modeling component and makes mention of other potential applications of the ROSE system.

  10. Impact of nighttime paving operations on asphalt roughness behavior.

    DOT National Transportation Integrated Search

    2013-05-01

    The relationship between nighttime construction scheduling and future road quality in terms of roughness was investigated. Research was three-phased: interviews with local leaders in paving, on-site observations, and historical data analyses. Intervi...

  11. 37 CFR 6.2 - Prior U.S. schedule of classes of goods and services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and polishing materials. 5 Adhesives. 6 Chemicals and chemical compositions. 7 Cordage. 8 Smokers... Fertilizers. 11 Inks and inking materials. 12 Construction materials. 13 Hardware and plumbing and...

  12. 37 CFR 6.2 - Prior U.S. schedule of classes of goods and services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and polishing materials. 5 Adhesives. 6 Chemicals and chemical compositions. 7 Cordage. 8 Smokers... Fertilizers. 11 Inks and inking materials. 12 Construction materials. 13 Hardware and plumbing and...

  13. 37 CFR 6.2 - Prior U.S. schedule of classes of goods and services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and polishing materials. 5 Adhesives. 6 Chemicals and chemical compositions. 7 Cordage. 8 Smokers... Fertilizers. 11 Inks and inking materials. 12 Construction materials. 13 Hardware and plumbing and...

  14. 37 CFR 6.2 - Prior U.S. schedule of classes of goods and services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and polishing materials. 5 Adhesives. 6 Chemicals and chemical compositions. 7 Cordage. 8 Smokers... Fertilizers. 11 Inks and inking materials. 12 Construction materials. 13 Hardware and plumbing and...

  15. Steel erected at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2008-01-01

    Workers erect the first fabricated steel girders to arrive at the A-3 Test Stand at Stennis Space Center. Steel work began at the construction site Oct. 29 and is scheduled to continue into next spring.

  16. Steel erected at A-3 Test Stand

    NASA Image and Video Library

    2008-10-29

    Workers erect the first fabricated steel girders to arrive at the A-3 Test Stand at Stennis Space Center. Steel work began at the construction site Oct. 29 and is scheduled to continue into next spring.

  17. 40 CFR 62.14555 - What if I do not meet an increment of progress?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  18. 40 CFR 62.14555 - What if I do not meet an increment of progress?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  19. Just Add Water and Stir. Graduate Chemistry Laboratory, Stony Brook

    ERIC Educational Resources Information Center

    Yee, Roger

    1974-01-01

    Using traditional building materials and a fast-track recipe, the architects, acting as construction manager, completed the Graduate Chemistry Laboratory at Stony Brook, New York, two full years ahead of schedule. (Author/MF)

  20. Analysis and Development of a Web-Enabled Planning and Scheduling Database Application

    DTIC Science & Technology

    2013-09-01

    establishes an entity—relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web- enabled interface for...development, develop, design, process, re- engineering, reengineering, MySQL , structured query language, SQL, myPHPadmin. 15. NUMBER OF PAGES 107 16...relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web-enabled interface for the population of

  1. Management process invaded Ames as the Center shifted from NACA to NASA oversight. Ames constructed

    NASA Technical Reports Server (NTRS)

    1968-01-01

    Management process invaded Ames as the Center shifted from NACA to NASA oversight. Ames constructed a review room in its headquarters building where, in the graphical style that prevailed in the 1960's, Ames leadership could review progress against schedule, budget and performance measures. Shown, in October 1965 is Merrill Mead chief of Ames' program and resources office. (for H Julian Allen Retirement album)

  2. A Knowledge Engineering Approach to Analysis and Evaluation of Construction Schedules

    DTIC Science & Technology

    1990-02-01

    software engineering discipline focusing on constructing KBSs. It is an incremental and cyclical process that requires the interaction of a domain expert(s...the U.S. Army Coips of Engineers ; and (3) the project management software developer, represented by Pinnell Engineering , Inc. Since the primary...the programming skills necessary to convert the raw knowledge intn a form a computer can understand. knowledge engineering : The software engineering

  3. Presentation on systems cluster research

    NASA Technical Reports Server (NTRS)

    Morgenthaler, George W.

    1989-01-01

    This viewgraph presentation presents an overview of systems cluster research performed by the Center for Space Construction. The goals of the research are to develop concepts, insights, and models for space construction and to develop systems engineering/analysis curricula for training future aerospace engineers. The following topics are covered: CSC systems analysis/systems engineering (SIMCON) model, CSC systems cluster schedule, system life-cycle, model optimization techniques, publications, cooperative efforts, and sponsored research.

  4. A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction

    PubMed Central

    Fu, Fang; Zhang, Tao

    2016-01-01

    A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939

  5. Validating the Outcome of Partnering on Major Capital Projects

    DOT National Transportation Integrated Search

    2017-01-27

    Research on the mechanics of successful collaborative partnering in roadway construction is relatively scarce; however, there is general agreement that successful partnering can result in better budget and schedule control as well as increase safety ...

  6. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... all electrical components for materials, workmanship, design, and construction; (2) Examination of all components of the machine which have been approved or certified under Bureau of Mines Schedule 2D, 2E, 2F, or...

  7. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... all electrical components for materials, workmanship, design, and construction; (2) Examination of all components of the machine which have been approved or certified under Bureau of Mines Schedule 2D, 2E, 2F, or...

  8. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... all electrical components for materials, workmanship, design, and construction; (2) Examination of all components of the machine which have been approved or certified under Bureau of Mines Schedule 2D, 2E, 2F, or...

  9. 78 FR 21623 - Public Housing Assessment System (PHAS): Capital Fund Final Scoring Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... PHAs from making improvements to the nation's aging stock and unfairly punishes PHAs for well-managed... that PHAs with active and on-schedule construction contracts should be able to exclude vacancies for...

  10. 75 FR 7411 - Schedule of Water Charges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...

  11. 40 CFR Table 1 to Subpart Ffff of... - Model Rule-Compliance Schedule

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9... devices so that, when the incineration unit is brought on line, all process changes and air pollution...

  12. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and...

  13. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and...

  14. 40 CFR Table 1 to Subpart Ffff of... - Model Rule-Compliance Schedule

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9... devices so that, when the incineration unit is brought on line, all process changes and air pollution...

  15. Structural considerations for underground nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarne, Y.

    The advantages and disadvantages of underground nuclear power plants are briefly reviewed. The impact of underground contruction on plant layout and structural design are discussed. Schedules and costs for construction are compared with those for conventional plants.

  16. Comprehensive Anti-error Study on Power Grid Dispatching Based on Regional Regulation and Integration

    NASA Astrophysics Data System (ADS)

    Zhang, Yunju; Chen, Zhongyi; Guo, Ming; Lin, Shunsheng; Yan, Yinyang

    2018-01-01

    With the large capacity of the power system, the development trend of the large unit and the high voltage, the scheduling operation is becoming more frequent and complicated, and the probability of operation error increases. This paper aims at the problem of the lack of anti-error function, single scheduling function and low working efficiency for technical support system in regional regulation and integration, the integrated construction of the error prevention of the integrated architecture of the system of dispatching anti - error of dispatching anti - error of power network based on cloud computing has been proposed. Integrated system of error prevention of Energy Management System, EMS, and Operation Management System, OMS have been constructed either. The system architecture has good scalability and adaptability, which can improve the computational efficiency, reduce the cost of system operation and maintenance, enhance the ability of regional regulation and anti-error checking with broad development prospects.

  17. Scheduling Randomly-Deployed Heterogeneous Video Sensor Nodes for Reduced Intrusion Detection Time

    NASA Astrophysics Data System (ADS)

    Pham, Congduc

    This paper proposes to use video sensor nodes to provide an efficient intrusion detection system. We use a scheduling mechanism that takes into account the criticality of the surveillance application and present a performance study of various cover set construction strategies that take into account cameras with heterogeneous angle of view and those with very small angle of view. We show by simulation how a dynamic criticality management scheme can provide fast event detection for mission-critical surveillance applications by increasing the network lifetime and providing low stealth time of intrusions.

  18. Parallel scheduling of recursively defined arrays

    NASA Technical Reports Server (NTRS)

    Myers, T. J.; Gokhale, M. B.

    1986-01-01

    A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.

  19. Mass Uncertainty and Application For Space Systems

    NASA Technical Reports Server (NTRS)

    Beech, Geoffrey

    2013-01-01

    Expected development maturity under contract (spec) should correlate with Project/Program Approved MGA Depletion Schedule in Mass Properties Control Plan. If specification NTE, MGA is inclusive of Actual MGA (A5 & A6). If specification is not an NTE Actual MGA (e.g. nominal), then MGA values are reduced by A5 values and A5 is representative of remaining uncertainty. Basic Mass = Engineering Estimate based on design and construction principles with NO embedded margin MGA Mass = Basic Mass * assessed % from approved MGA schedule. Predicted Mass = Basic + MGA. Aggregate MGA % = (Aggregate Predicted - Aggregate Basic) /Aggregate Basic.

  20. A pharmacokinetic model of filgrastim and pegfilgrastim application in normal mice and those with cyclophosphamide-induced granulocytopaenia.

    PubMed

    Scholz, M; Ackermann, M; Engel, C; Emmrich, F; Loeffler, M; Kamprad, M

    2009-12-01

    Recombinant human granulocyte colony-stimulating factor (rhG-CSF) is widely used as treatment for granulocytopaenia during cytotoxic chemotherapy; however, optimal scheduling of this pharmaceutical is unknown. Biomathematical models can help to pre-select optimal application schedules but precise pharmacokinetic properties of the pharmaceuticals are required at first. In this study, we have aimed to construct a pharmacokinetic model of G-CSF derivatives filgrastim and pegfilgrastim in mice. Healthy CD-1 mice and those with cyclophosphamide-induced granulocytopaenia were studied after administration of filgrastim and pegfilgrastim in different dosing and timing schedules. Close meshed time series of granulocytes and G-CSF plasma concentrations were determined. An ordinary differential equations model of pharmacokinetics was constructed on the basis of known mechanisms of drug distribution and degradation. Predictions of the model fit well with all experimental data for both filgrastim and pegfilgrastim. We obtained a unique parameter setting for all experimental scenarios. Differences in pharmacokinetics between filgrastim and pegfilgrastim can be explained by different estimates of model parameters rather than by different model mechanisms. Parameter estimates with respect to distribution and clearance of the drug derivatives are in agreement with qualitative experimental results. Dynamics of filgrastim and pegfilgrastim plasma levels can be explained by the same pharmacokinetic model but different model parameters. Beause of a strong clearance mechanism mediated by granulocytes, granulocytotic and granulocytopaenic conditions must be studied simultaneously to construct a reliable model. The pharmacokinetic model will be extended to a murine model of granulopoiesis under chemotherapy and G-CSF application.

  1. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    NASA Astrophysics Data System (ADS)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education programs and the stress of testing on everyone involved in high-stakes testing.

  2. The Joint Confidence Level Paradox: A History of Denial

    NASA Technical Reports Server (NTRS)

    Butts, Glenn; Linton, Kent

    2009-01-01

    This paper is intended to provide a reliable methodology for those tasked with generating price tags on construction (C0F) and research and development (R&D) activities in the NASA performance world. This document consists of a collection of cost-related engineering detail and project fulfillment information from early agency days to the present. Accurate historical detail is the first place to start when determining improved methodologies for future cost and schedule estimating. This paper contains a beneficial proposed cost estimating method for arriving at more reliable numbers for future submits. When comparing current cost and schedule methods with earlier cost and schedule approaches, it became apparent that NASA's organizational performance paradigm has morphed. Mission fulfillment speed has slowed and cost calculating factors have increased in 21st Century space exploration.

  3. Planning and scheduling the Hubble Space Telescope: Practical application of advanced techniques

    NASA Technical Reports Server (NTRS)

    Miller, Glenn E.

    1994-01-01

    NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 1990. In late 1993, the first of several planned servicing missions refurbished the telescope, including corrections for a manufacturing flaw in the primary mirror. Orbiting above the distorting effects of the Earth's atmosphere, the HST provides an unrivaled combination of sensitivity, spectral coverage and angular resolution. The HST is arguably the most complex scientific observatory ever constructed and effective use of this valuable resource required novel approaches to astronomical observation and the development of advanced software systems including techniques to represent scheduling preferences and constraints, a constraint satisfaction problem (CSP) based scheduler and a rule based planning system. This paper presents a discussion of these systems and the lessons learned from operational experience.

  4. Estimates of the absolute error and a scheme for an approximate solution to scheduling problems

    NASA Astrophysics Data System (ADS)

    Lazarev, A. A.

    2009-02-01

    An approach is proposed for estimating absolute errors and finding approximate solutions to classical NP-hard scheduling problems of minimizing the maximum lateness for one or many machines and makespan is minimized. The concept of a metric (distance) between instances of the problem is introduced. The idea behind the approach is, given the problem instance, to construct another instance for which an optimal or approximate solution can be found at the minimum distance from the initial instance in the metric introduced. Instead of solving the original problem (instance), a set of approximating polynomially/pseudopolynomially solvable problems (instances) are considered, an instance at the minimum distance from the given one is chosen, and the resulting schedule is then applied to the original instance.

  5. Efficient bounding schemes for the two-center hybrid flow shop scheduling problem with removal times.

    PubMed

    Hidri, Lotfi; Gharbi, Anis; Louly, Mohamed Aly

    2014-01-01

    We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.

  6. Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times

    PubMed Central

    2014-01-01

    We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures. PMID:25610911

  7. A synopsis of the EVA training conducted on EASE/ACCESS for STS-61-B

    NASA Technical Reports Server (NTRS)

    Havens, Kathryn A.

    1987-01-01

    Experimental Assembly of Structure in EVA (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) training problems; photography/television coverage; training schedules; flight data file (FDF), and flight rules production are summarized.

  8. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be Schedule 80 weight or heavier. Malleable metals must be used in the construction of valves and fittings. Where copper tubing is permitted, joints shall be brazed or be of equally strong metal union type...

  9. 77 FR 23547 - Taking and Importing Marine Mammals; Taking Marine Mammals Incidental to Columbia River Crossing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... at Astoria, Oregon. Coastal tides influence the flow rate and river level up to Bonneville Dam at.... Contractor schedules, weather, materials, and equipment could also influence construction duration. CRC would...

  10. 40 CFR 57.705 - Contents of SIP Compliance Schedule required by § 57.201(d) (2) and (3).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... process hardware to be used in achieving compliance with the SIP emission limitation including gas... necessary performance improvements; (4) The date for initiating on-site construction or installation of...

  11. DESIGN AND CONSTRUCTION OF SCHOOL BUILDINGS. PROCEEDINGS, ASSOCIATION OF SCHOOL BUSINESS OFFICIALS OF THE UNITED STATES AND CANADA, ANNUAL MEETING AND EDUCATIONAL EXHIBIT, (50TH SAN FRANCISCO, CALIFORNIA, OCTOBER 71-22, 1964).

    ERIC Educational Resources Information Center

    LIEBESKIND, MORRIS

    PROBLEMS IN THE SCHEDULING AND COMPLETION OF SCHOOL BUILDING DESIGN AND CONSTRUCTION PROJECTS ARE DISCUSSED WITH REFERENCE TO THE CRITICAL PATH METHOD OF PROGRAMING. THE DISCUSSION GIVES A BROAD OVERVIEW OF THE METHOD WITH DETAILED SUGGESTIONS FOR SCHOOL ADMINISTRATORS. SPECIFIC SUBJECT AREAS INCLUDE--(1) CPM, A NEW MANAGEMENT TOOL, (2) CPM…

  12. Ford-Class Aircraft Carrier: Congress Should Consider Revising Cost Cap Legislation to Include All Construction Costs

    DTIC Science & Technology

    2014-11-01

    thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost...cap, by postponing installation of some systems until after ship delivery, and deferring an estimated $200 million - $250 million in previously

  13. A bicriteria heuristic for an elective surgery scheduling problem.

    PubMed

    Marques, Inês; Captivo, M Eugénia; Vaz Pato, Margarida

    2015-09-01

    Resource rationalization and reduction of waiting lists for surgery are two main guidelines for hospital units outlined in the Portuguese National Health Plan. This work is dedicated to an elective surgery scheduling problem arising in a Lisbon public hospital. In order to increase the surgical suite's efficiency and to reduce the waiting lists for surgery, two objectives are considered: maximize surgical suite occupation and maximize the number of surgeries scheduled. This elective surgery scheduling problem consists of assigning an intervention date, an operating room and a starting time for elective surgeries selected from the hospital waiting list. Accordingly, a bicriteria surgery scheduling problem arising in the hospital under study is presented. To search for efficient solutions of the bicriteria optimization problem, the minimization of a weighted Chebyshev distance to a reference point is used. A constructive and improvement heuristic procedure specially designed to address the objectives of the problem is developed and results of computational experiments obtained with empirical data from the hospital are presented. This study shows that by using the bicriteria approach presented here it is possible to build surgical plans with very good performance levels. This method can be used within an interactive approach with the decision maker. It can also be easily adapted to other hospitals with similar scheduling conditions.

  14. An improved robust buffer allocation method for the project scheduling problem

    NASA Astrophysics Data System (ADS)

    Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad

    2017-04-01

    Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.

  15. DNA targeting of rhinal cortex D2 receptor protein reversibly blocks learning of cues that predict reward.

    PubMed

    Liu, Zheng; Richmond, Barry J; Murray, Elisabeth A; Saunders, Richard C; Steenrod, Sara; Stubblefield, Barbara K; Montague, Deidra M; Ginns, Edward I

    2004-08-17

    When schedules of several operant trials must be successfully completed to obtain a reward, monkeys quickly learn to adjust their behavioral performance by using visual cues that signal how many trials have been completed and how many remain in the current schedule. Bilateral rhinal (perirhinal and entorhinal) cortex ablations irreversibly prevent this learning. Here, we apply a recombinant DNA technique to investigate the role of dopamine D2 receptor in rhinal cortex for this type of learning. Rhinal cortex was injected with a DNA construct that significantly decreased D2 receptor ligand binding and temporarily produced the same profound learning deficit seen after ablation. However, unlike after ablation, the D2 receptor-targeted, DNA-treated monkeys recovered cue-related learning after 11-19 weeks. Injecting a DNA construct that decreased N-methyl-d-aspartate but not D2 receptor ligand binding did not interfere with learning associations between the cues and the schedules. A second D2 receptor-targeted DNA treatment administered after either recovery from a first D2 receptor-targeted DNA treatment (one monkey), after N-methyl-d-aspartate receptor-targeted DNA treatment (two monkeys), or after a vector control treatment (one monkey) also induced a learning deficit of similar duration. These results suggest that the D2 receptor in primate rhinal cortex is essential for learning to relate the visual cues to the schedules. The specificity of the receptor manipulation reported here suggests that this approach could be generalized in this or other brain pathways to relate molecular mechanisms to cognitive functions.

  16. DNA targeting of rhinal cortex D2 receptor protein reversibly blocks learning of cues that predict reward

    PubMed Central

    Liu, Zheng; Richmond, Barry J.; Murray, Elisabeth A.; Saunders, Richard C.; Steenrod, Sara; Stubblefield, Barbara K.; Montague, Deidra M.; Ginns, Edward I.

    2004-01-01

    When schedules of several operant trials must be successfully completed to obtain a reward, monkeys quickly learn to adjust their behavioral performance by using visual cues that signal how many trials have been completed and how many remain in the current schedule. Bilateral rhinal (perirhinal and entorhinal) cortex ablations irreversibly prevent this learning. Here, we apply a recombinant DNA technique to investigate the role of dopamine D2 receptor in rhinal cortex for this type of learning. Rhinal cortex was injected with a DNA construct that significantly decreased D2 receptor ligand binding and temporarily produced the same profound learning deficit seen after ablation. However, unlike after ablation, the D2 receptor-targeted, DNA-treated monkeys recovered cue-related learning after 11–19 weeks. Injecting a DNA construct that decreased N-methyl-d-aspartate but not D2 receptor ligand binding did not interfere with learning associations between the cues and the schedules. A second D2 receptor-targeted DNA treatment administered after either recovery from a first D2 receptor-targeted DNA treatment (one monkey), after N-methyl-d-aspartate receptor-targeted DNA treatment (two monkeys), or after a vector control treatment (one monkey) also induced a learning deficit of similar duration. These results suggest that the D2 receptor in primate rhinal cortex is essential for learning to relate the visual cues to the schedules. The specificity of the receptor manipulation reported here suggests that this approach could be generalized in this or other brain pathways to relate molecular mechanisms to cognitive functions. PMID:15302926

  17. Construction and validation of the South African version of the Fear Survey Schedule for Children: an exploratory factor analysis.

    PubMed

    Burkhardt, Käthe; Loxton, Helene; Kagee, Ashraf; Ollendick, Thomas H

    2012-09-01

    The Fear Survey Schedule for Children-Revised (Ollendick, 1983) is an 80-item self-report instrument that has been used internationally to asses the number of fears and general level of fearfulness among children. Despite its widespread use, this instrument has not been adapted to the South African context. The present study addressed this gap by means of a 2-phase investigation aimed at developing a South African version of the instrument. In Phase 1, semistructured interviews were conducted with 40 children (7 to 13 years of age). Qualitative data obtained from these interviews were used to construct additional items for inclusion in the South African Fear Survey Schedule for Children-Revised. The modified scale, consisting of 97 items, was then administered to a sample of 646 children between the ages of 7 and 13 years. Further psychometric considerations resulted in the final version of the scale consisting of 74 items with high internal consistency (α=.97). The factor structure was explored by means of principal component analysis with varimax rotation and a 5-factor solution was found to provide the best conceptual fit. The factors identified were as follows: Fear of Death and Danger; Fear of the Unknown; Fear of Small Animals and Minor Threats to Self; Large Animal Fears; and Situational Fears. Differences between the South African version and the original Fear Survey Schedule for Children-Revised are noted and implications for the study of fear in South Africa and other countries are discussed. Copyright © 2012. Published by Elsevier Ltd.

  18. The ARCO 1 megawatt Photovoltaic Power Plant

    NASA Astrophysics Data System (ADS)

    Rhodes, G. W.; Reilly, M. R.

    The world's largest Photovoltaic Power Plant is in operation and meeting performance specifications on the Southern California Edison (SCE) grid near Hesperia, California. The 1 MW plant designed and constructed by The BDM Corporation, for ARCO Solar Inc., occupies a 20 acre site adjacent to the SCE Lugo substation. The entire design and construction process took 7 1/2 months and was not only on schedule but below budget. Because of its vast photovoltaic experience, BDM was chosen over several engineering firms to perform this complex job. We were provided a conceptual design from ARCO which we quickly refined and immediately initiated construction.

  19. Systems Analysis of Rapid Transit Underground Construction : Volume 2. Sections 6-9 and Appendixes.

    DOT National Transportation Integrated Search

    1974-12-01

    Three San Francisco Bay Area Rapid Transit (BART) projects and two Washington Metropolitan Area Transit Authority (WMATA) projects are analyzed with respect to time schedules, costs, and sensitivity to physical and institutional controls. These data ...

  20. Surface infrastructure : cost, financing and schedules for large-dollar transportation projects

    DOT National Transportation Integrated Search

    1998-02-01

    In fiscal year 1998, the federal government will distribute nearly $26 billion to states and localities for the construction and repair of the nation's surface transportation systems. To meet the nations' transportation needs, states and localities a...

  1. 43 CFR 34.4 - Discrimination prohibited.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.4 Discrimination... or bids, the designation of quantities, delivery schedules or other specifications, selection... individuals or establishments to be provided an opportunity to participate in any activity; and (ix) Selection...

  2. 43 CFR 34.4 - Discrimination prohibited.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.4 Discrimination... or bids, the designation of quantities, delivery schedules or other specifications, selection... individuals or establishments to be provided an opportunity to participate in any activity; and (ix) Selection...

  3. Estimating workforce development needs for high-speed rail in California.

    DOT National Transportation Integrated Search

    2012-03-01

    This study provides an assessment of the job creation and attendant education and training needs associated with the creation of the California High-Speed Rail (CHSR) network, scheduled to begin construction in September 2012. Given the high profile ...

  4. The National Ignition Facility and Industry

    NASA Astrophysics Data System (ADS)

    Harri, J. G.; Paisner, J. A.; Lowdermilk, W. H.; Boyes, J. D.; Kumpan, S. A.; Sorem, M. S.

    1994-09-01

    The mission of the National Ignition Facility is to achieve ignition and gain in inertial confinement fusion targets in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects testing, and for civilian applications such as fusion energy development and fundamental studies of matter at high temperatures and densities. The National Ignition Facility construction project will require the best of our construction industries and its success will depend on the best products offered by hundreds of the nation's high technology companies. Three-fourths of the construction costs will be invested in industry. This article reviews the design, cost and schedule, and required industrial involvement associated with the construction project.

  5. The LSST Scheduler from design to construction

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Reuter, Michael A.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) will be a highly robotic facility, demanding a very high efficiency during its operation. To achieve this, the LSST Scheduler has been envisioned as an autonomous software component of the Observatory Control System (OCS), that selects the sequence of targets in real time. The Scheduler will drive the survey using optimization of a dynamic cost function of more than 200 parameters. Multiple science programs produce thousands of candidate targets for each observation, and multiple telemetry measurements are received to evaluate the external and the internal conditions of the observatory. The design of the LSST Scheduler started early in the project supported by Model Based Systems Engineering, detailed prototyping and scientific validation of the survey capabilities required. In order to build such a critical component, an agile development path in incremental releases is presented, integrated to the development plan of the Operations Simulator (OpSim) to allow constant testing, integration and validation in a simulated OCS environment. The final product is a Scheduler that is also capable of running 2000 times faster than real time in simulation mode for survey studies and scientific validation during commissioning and operations.

  6. Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2

    DTIC Science & Technology

    1990-05-01

    curves ; test reports; test cylinders: samples, O&M manuals including parts lists; certifications; warranties and other such required submittals...purpose. 14.4.3. Authority and responsibilities of all quality control personnel. 14.4.4. Schedule of Use of inspection personnel by types and phase of...quality control program shall include four phases of inspection and tests. The Contracting Officer’s representative shall be notified at least 24

  7. Operations analysis for lunar surface construction: Results of two office of exploration case studies

    NASA Astrophysics Data System (ADS)

    Bell, Lisa Y.; Boles, Walter; Smith, Alvin

    1991-08-01

    In an environment of intense competition for Federal funding, the U.S. space research community is responsible for developing a feasible, cost-effective approach to establishing a surface base on the moon to fulfill long-term Government objectives. This report presents the results of a construction operations analysis of two lunar scenarios provided by the National Aeronautics and Space Administration (NASA). Activities necessary to install the lunar base surface elements are defined and scheduled, based on the productivities and availability of the base resources allocated to the projects depicted in each scenario. The only construction project in which the required project milestones were not completed within the nominal timeframe was the initial startup phase of NASA's FY89 Lunar Evolution Case Study (LECS), primarily because this scenario did not include any Earth-based telerobotic site preparation before the arrival of the first crew. The other scenario analyzed. Reference Mission A from NASA's 90-Day Study of the Human Exploration of the Moon and Mars, did use telerobotic site preparation before the manned phase of the base construction. Details of the analysis for LECS are provided, including spreadsheets indicating quantities of work and Gantt charts depicting the general schedule for the work. This level of detail is not presented for the scenario based on the 90-Day Study because many of the projects include the same (or similar) surface elements and facilities.

  8. Design and application of BIM based digital sand table for construction management

    NASA Astrophysics Data System (ADS)

    Fuquan, JI; Jianqiang, LI; Weijia, LIU

    2018-05-01

    This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.

  9. Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

  10. Heuristic methods for the single machine scheduling problem with different ready times and a common due date

    NASA Astrophysics Data System (ADS)

    Birgin, Ernesto G.; Ronconi, Débora P.

    2012-10-01

    The single machine scheduling problem with a common due date and non-identical ready times for the jobs is examined in this work. Performance is measured by the minimization of the weighted sum of earliness and tardiness penalties of the jobs. Since this problem is NP-hard, the application of constructive heuristics that exploit specific characteristics of the problem to improve their performance is investigated. The proposed approaches are examined through a computational comparative study on a set of 280 benchmark test problems with up to 1000 jobs.

  11. 49 CFR 80.5 - Limitations on assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... extended construction periods and financing needs. The TIFIA's effectiveness in stimulating private... Significant Impact, or Record of Decision. (g) The Secretary shall fund a secured loan based on the project's financing needs. The credit agreement shall include the anticipated schedule for such loan disbursements...

  12. 46 CFR 160.135-9 - Preapproval review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... lay-up schedule for a Fiber Reinforced Plastic (FRP) lifeboat; (7) Hull and canopy construction..., fiberglass, cloth, and plastic used in the lifeboat's manufacture; (10) Fabrication details for each major... water spray systems drawings and specifications, if installed; (16) Plans for critical subassemblies...

  13. 46 CFR 160.135-9 - Preapproval review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... lay-up schedule for a Fiber Reinforced Plastic (FRP) lifeboat; (7) Hull and canopy construction..., fiberglass, cloth, and plastic used in the lifeboat's manufacture; (10) Fabrication details for each major... water spray systems drawings and specifications, if installed; (16) Plans for critical subassemblies...

  14. 46 CFR 160.135-9 - Preapproval review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... lay-up schedule for a Fiber Reinforced Plastic (FRP) lifeboat; (7) Hull and canopy construction..., fiberglass, cloth, and plastic used in the lifeboat's manufacture; (10) Fabrication details for each major... water spray systems drawings and specifications, if installed; (16) Plans for critical subassemblies...

  15. Co-Instructing at the Secondary Level: Strategies for Success

    ERIC Educational Resources Information Center

    Rice, Nancy; Drame, Elizabeth; Owens, Laura; Frattura, Elise M.

    2007-01-01

    Much has been written about collaboration and co-teaching in secondary settings, including the importance of understanding one's partner's teaching approach; determining readiness to co-teach; clarifying roles, responsibilities, and expectations; scheduling shared planning time; and effective communication, including constructive dialogue and…

  16. Proposal of Heuristic Algorithm for Scheduling of Print Process in Auto Parts Supplier

    NASA Astrophysics Data System (ADS)

    Matsumoto, Shimpei; Okuhara, Koji; Ueno, Nobuyuki; Ishii, Hiroaki

    We are interested in the print process on the manufacturing processes of auto parts supplier as an actual problem. The purpose of this research is to apply our scheduling technique developed in university to the actual print process in mass customization environment. Rationalization of the print process is depending on the lot sizing. The manufacturing lead time of the print process is long, and in the present method, production is done depending on worker’s experience and intuition. The construction of an efficient production system is urgent problem. Therefore, in this paper, in order to shorten the entire manufacturing lead time and to reduce the stock, we reexamine the usual method of the lot sizing rule based on heuristic technique, and we propose the improvement method which can plan a more efficient schedule.

  17. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling.

    PubMed

    Yang, S; Wang, D

    2000-01-01

    This paper presents a constraint satisfaction adaptive neural network, together with several heuristics, to solve the generalized job-shop scheduling problem, one of NP-complete constraint satisfaction problems. The proposed neural network can be easily constructed and can adaptively adjust its weights of connections and biases of units based on the sequence and resource constraints of the job-shop scheduling problem during its processing. Several heuristics that can be combined with the neural network are also presented. In the combined approaches, the neural network is used to obtain feasible solutions, the heuristic algorithms are used to improve the performance of the neural network and the quality of the obtained solutions. Simulations have shown that the proposed neural network and its combined approaches are efficient with respect to the quality of solutions and the solving speed.

  18. Translation and cross-cultural adaptation of the Cardiff Wound Impact Schedule to Brazilian Portuguese.

    PubMed

    Augusto, Fabiana da Silva; Blanes, Leila; Nicodemo, Denise; Ferreira, Lydia Masako

    2017-05-01

    To translate into Brazilian Portuguese and cross-culturally adapt the Cardiff Wound Impact Schedule, a specific measure of health-related quality of life (HRQoL) for patients with chronic wounds. Chronic wounds have a relevant impact on the HRQoL of patients. However, there are few instruments cross-culturally adapted and validated in Brazil to assess HRQoL in patients with wounds. A descriptive cross-sectional study was conducted following six steps: (1) translation of the original instrument into Brazilian-Portuguese by two independent translators; (2) construction of a consensus version based on both translations; (3) two independent back-translations into English of the consensus version; (4) review by an expert committee and construction of the pre-final version; (5) testing of the pre-final version on patients with chronic wounds; and (6) construction of the final version. The psychometric properties of the instrument were tested on 30 patients with chronic wounds of the lower limb; 76.7% were men, 70.0% had traumatic wounds, and 43.3% had the wound for more than 1 year. Participants were recruited from an outpatient wound care clinic in São Paulo, Brazil. The final version approved by the expert committee was well understood by all patients who participate in the study and had satisfactory face validity, content validity, and internal consistency, with Cronbach's alpha coefficients ranging from 0.681 to 0.920. The cross-culturally adapted Brazilian-Portuguese version of the instrument showed satisfactory face and content validity, good internal consistency, and was named Cardiff Wound Impact Schedule-Federal University of São Paulo School of Medicine or CWIS-UNIFESP/EPM. Copyright © 2016 Tissue Viability Society. Published by Elsevier Ltd. All rights reserved.

  19. Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

    NASA Technical Reports Server (NTRS)

    Dowding, John; Frank, Jeremy; Hockey, Beth Ann; Jonsson, Ari; Aist, Gregory

    2002-01-01

    Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

  20. STS-100 MS Parazynski looks over Destiny in SSPF

    NASA Technical Reports Server (NTRS)

    2000-01-01

    In the Space Station Processing Facility, STS-100 Mission Specialist Scott Parazynski looks over part of the U.S. Lab, Destiny. Mission STS-100 will be the ninth construction flight for the International Space Station. It is scheduled to launch April 19, 2001.

  1. 18 CFR 157.11 - Hearings.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Hearings. 157.11..., Construction, Extension, Acquisition or Abandonment § 157.11 Hearings. (a) General. The Commission will schedule each application for public hearing at the earliest date possible giving due consideration to...

  2. Development of a procedure for updating liquidated damage rates used in ALDOT construction contracts.

    DOT National Transportation Integrated Search

    2008-10-01

    This research effort sought to develop statistically justifiable means for developing a : schedule of liquidated damage (LD) rates to be adopted by the Alabama Department of : Transportation (ALDOT). The procedure outlined is to be used to review and...

  3. 48 CFR 52.236-21 - Specifications and Drawings for Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of... shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or..., diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data...

  4. MIGRATORY LABOR IN OHIO.

    ERIC Educational Resources Information Center

    BINGHAM, SALLY

    OHIO HAS BECOME A HIGHLY INDUSTRIALIZED STATE WITH INSUFFICIENT QUALIFIED LOCAL FARM WORKERS TO MEET HARVEST DEMANDS. MIGRANT WORKERS HAVE FILLED THAT NEED, DOING MOSTLY "STOOP WORK" AND WORKING IN FOOD PROCESSING PLANTS. THE ANNUAL WORKER PLAN HAS PROVIDED FOR MORE EFFICIENT SCHEDULING OF MIGRANTS. CONSTRUCTIVE PROGRAMS HAVE BEEN…

  5. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  6. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  7. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  8. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  9. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  10. 76 FR 4574 - Drawbridge Operation Regulations; Oakland Inner Harbor Tidal Canal, Oakland/Alameda, CA, Schedule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Chance, Aroma Restaurant, Eskelund Marine, Bocanova, Vortex Marine Construction, British Marine, The Outboard Motor Shop, Waterfront Hotel-Miss Pearl's Restaurant, Encinal Yacht Club, Marina Village Inn, Kincaid's Restaurant, Scott's Seafood Restaurant, Captain Ed Payne Technical Services, Il Pescatore...

  11. 78 FR 10214 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... related to grants, land surveys, and engineering, geospatial, and road construction projects. 3... Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road, College...), National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001. Telephone...

  12. Cost Control

    ERIC Educational Resources Information Center

    Foreman, Phillip

    2009-01-01

    Education administrators involved in construction initiatives unanimously agree that when it comes to change orders, less is more. Change orders have a negative rippling effect of driving up building costs and producing expensive project delays that often interfere with school operations and schedules. Some change orders are initiated by schools…

  13. A New Metaheuristic Algorithm for Long-Term Open-Pit Production Planning / Nowy meta-heurystyczny algorytm wspomagający długoterminowe planowanie produkcji w kopalni odkrywkowej

    NASA Astrophysics Data System (ADS)

    Sattarvand, Javad; Niemann-Delius, Christian

    2013-03-01

    Paper describes a new metaheuristic algorithm which has been developed based on the Ant Colony Optimisation (ACO) and its efficiency have been discussed. To apply the ACO process on mine planning problem, a series of variables are considered for each block as the pheromone trails that represent the desirability of the block for being the deepest point of the mine in that column for the given mining period. During implementation several mine schedules are constructed in each iteration. Then the pheromone values of all blocks are reduced to a certain percentage and additionally the pheromone value of those blocks that are used in defining the constructed schedules are increased according to the quality of the generated solutions. By repeated iterations, the pheromone values of those blocks that define the shape of the optimum solution are increased whereas those of the others have been significantly evaporated.

  14. Algorithms for constructing optimal paths and statistical analysis of passenger traffic

    NASA Astrophysics Data System (ADS)

    Trofimov, S. P.; Druzhinina, N. G.; Trofimova, O. G.

    2018-01-01

    Several existing information systems of urban passenger transport (UPT) are considered. Author’s UPT network model is presented. To a passenger a new service is offered that is the best path from one stop to another stop at a specified time. The algorithm and software implementation for finding the optimal path are presented. The algorithm uses the current UPT schedule. The article also describes the algorithm of statistical analysis of trip payments by the electronic E-cards. The algorithm allows obtaining the density of passenger traffic during the day. This density is independent of the network topology and UPT schedules. The resulting density of the traffic flow can solve a number of practical problems. In particular, the forecast for the overflow of passenger transport in the «rush» hours, the quantitative comparison of different topologies transport networks, constructing of the best UPT timetable. The efficiency of the proposed integrated approach is demonstrated by the example of the model town with arbitrary dimensions.

  15. Developing a short form of the simple Rathus assertiveness schedule using a sample of adults with sickle cell disease.

    PubMed

    Jenerette, Coretta; Dixon, Jane

    2010-10-01

    Ethnic and cultural norms influence an individual's assertiveness. In health care, assertiveness may play an important role in health outcomes, especially for predominantly minority populations, such as adults with sickle cell disease. Therefore, it is important to develop measures to accurately assess assertiveness. It is also important to reduce response burden of lengthy instruments while retaining instrument reliability and validity. The purpose of this article is to describe development of a shorter version of the Simple Rathus Assertiveness Schedule (SRAS). Data from a cross-sectional descriptive study of adults with sickle cell disease were used to construct a short form of the SRAS, guided by stepwise regression analysis. The 19-item Simple Rathus Assertiveness Scale-Short Form (SRAS-SF) had acceptable reliability (α = .81) and construct validity and was highly correlated with the SRAS (r = .98, p = .01). The SRAS-SF reduces response burden, while maintaining reliability and validity.

  16. Factors for Generating Initial Construction Schedules

    DTIC Science & Technology

    1991-09-01

    2.2.8 Approach at Stone & Webster Co. 15 2.2.9 Approach at Bechtel Co. 16 2.2.10 SIPEC 16 2.2.11 OARPLAN 16 2.2.12 Other Research Efforts 17 2.2.13...PEC’s (Primitive Elements of Construction). PEC’s are tasks associated with a single activity and performed by a single crew. 2.2.8 Approach at Stone ...Webster Co. Stone & Webster has invested substantial efforts to integrate the informational needs of different project participants. Their current

  17. Programming with Intervals

    NASA Astrophysics Data System (ADS)

    Matsakis, Nicholas D.; Gross, Thomas R.

    Intervals are a new, higher-level primitive for parallel programming with which programmers directly construct the program schedule. Programs using intervals can be statically analyzed to ensure that they do not deadlock or contain data races. In this paper, we demonstrate the flexibility of intervals by showing how to use them to emulate common parallel control-flow constructs like barriers and signals, as well as higher-level patterns such as bounded-buffer producer-consumer. We have implemented intervals as a publicly available library for Java and Scala.

  18. Development of processing diagrams for polymeric die attach adhesives

    NASA Astrophysics Data System (ADS)

    Hsiung, Jen-Chou

    With a processing diagram, one can reduce the effort required to customize curing process conditions for polymeric die attach adhesives. Polymeric die attach adhesives are often cured per the manufacturer's recommendations during initial screening evaluations. In most cases, the recommended cure schedules have to be modified so as to fit differences in process equipment. Unfortunately, the modified cure schedule is usually determined by a trial-and-error method. An aim of our experiments is to understand the curing process of a wide range of polymeric die attach adhesives (conventional, fast, and snap cure adhesives) and to construct a processing diagram, i.e., "Bondability Diagram", so as to define the processing window. Such diagrams should be helpful in determining both the time and cure temperature required to produce high quality bonds. The bondability diagram can be constructed based on fundamental understandings of the phenomena involved in the curing process using a wide variety of tools. Differential Scanning Calorimetry (DSC) is utilized to study the cure kinetics and the extent of reaction. Dynamic Mechanical Analysis (DMA) is used to determine gelation times and melt viscosity under a shear mode. A modified Rheovibron is employed to perform cure characterizations under a tensile mode so that cure stresses could be determined. Thermogravimetric Analysis (TGA) is used to evaluate the outgassing phenomena. Optical Microscopy (OM) is used to detect voids. Results indicate that the cure behaviors of conventional, fast, and snap cure adhesives are different in several respects. The combination of DSC, DMA, TGA, OM, and lap shear test leads to a frame work of developing the bondability diagram concept. The bondability diagram concept provides a foundation for an understanding of the recommended cure schedule and allows one to design their own cure schedule.

  19. Quality of life in people with Parkinson's disease: the relevance of social relationships and communication.

    PubMed

    Takahashi, Kayoko; Kamide, Naoto; Suzuki, Makoto; Fukuda, Michinari

    2016-01-01

    [Purpose] Maintaining high quality of life is crucial for the rehabilitation of patients with Parkinson's disease. The quality of life scales currently in use do not assess all quality of life domains or their importance for each individual. Therefore, a new quality of life measure, the Schedule for the Evaluation of Individual Quality of Life-Direct Weighting, was used to investigate quality of life in people with Parkinson's disease. [Subjects and Methods] Fifteen people with idiopathic Parkinson's disaese (average age = 80.0 years, standard deviation = 10.3 years, Hoehn & Yahr stages 1-4) were interviewed using the Schedule for the Evaluation of Individual Quality of Life-Direct Weighting. Its quality of life constructs were tested by comparing them against disease-specific quality of life (39-items Parkinson's Disease Questionnaire), motor functioning (Unified Parkinson's Disease Rating Scale Part III), and activities of daily living (Barthel Index). [Results] Social connections such as "family" and "friends" were revealed as important constructs of life satisfaction. The Schedule for the Evaluation of Individual Quality of Life-Direct Weighting was not significantly correlated with the 39-items Parkinson's Disease Questionnaire, Unified Parkinson's Disease Rating Scale Part III, or Barthel Index but was significantly correlated with the "communication" dimension of the 39-items Parkinson's Disease Questionnaire. [Conclusion] The Schedule for the Evaluation of Individual Quality of Life-Direct Weighting detected various domains of quality of life, especially social relationships with family and friends. "Being heard" was also revealed as an essential component of life satisfaction, as it provides patients with a feeling of acceptance and assurance, possibly resulting in better quality of life.

  20. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandvik, K.; Karal, K.

    The paper gives a general description of the Concrete Gravity Base Structure (GBS) for the Draugen platform installed by Norwegian Contractors a.s. The GBS was installed at the Haltenbank area on the Norwegian continental shelf in May 1993 for A/S Norske Shell. Further, the paper describes the following challenging aspects encountered during the design and construction: design for high frequency response to wave loading, so called ringing, discovered during construction of the GBS; impact of the ringing effect discovery on the construction schedule; design to prevent delamination of concrete structural elements; modifications to prevent damages on pipe work caused bymore » deformations of the concrete structure.« less

  2. Engineer Equipment Chief.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment chiefs. Addressed in the five individual units of the course are the following topics: construction management (planning, scheduling, and supervision);…

  3. Surveying School Facilities Needs.

    ERIC Educational Resources Information Center

    Weichel, Harry J.; Dennell, James

    1990-01-01

    Ralston (Nebraska) Public School District's communitywide survey helped set school facilities priorities while keeping the district's finite resources firmly in mind. With an outline of maintenance costs for the next 10 years, the district can develop a strategic construction schedule. The board also has the option of financing projects through a…

  4. Long-term performance of concrete containing hydrated hydraulic lime as an admixture.

    DOT National Transportation Integrated Search

    1976-01-01

    In 1941 two bridges were constructed with decks using concrete incorporating as an experimental feature the use of hydrated lime as an admixture in amounts varying from zero to 12%. After 35 years of service the decks were scheduled for repairs to co...

  5. Evaluation of the use of rubber-tire rollers on asphalt concrete.

    DOT National Transportation Integrated Search

    1989-01-01

    The addition of a rubber-tire roller was required on two projects on maintenance schedules and on two construction projects in 1988. The rubber-tire roller was used as an addition to the conventional rollers on one-half of each project. The rubber-ti...

  6. 40 CFR 60.1250 - What is my schedule for evaluating continuous emission monitoring systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring systems? 60.1250 Section 60.1250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced...

  7. Proposal for the completion of outstanding work on the installation scheduling and alignment of the SDC central calorimeter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guarino, V.; Hill, N.; Nasiatka, J.

    The High Energy Physic Division at Argonne National Laboratory was given the task of developing the procedures, fixtures, and schedules for the final assembly of the barrel and endcap calorimeters for the SDC. The work completed led to some major decision about how and where this assembly work would be done. The primary assembly decision was the feasibility of assembling the major detector components (barrel and endcap sub-assemblies) above ground and lowering them into position in the experimental hall, as opposed to assembling the calorimeter directly in the experimental hall. Due to cost of above ground assembly and schedule changes,more » the in-hall option was adopted. Although no actual hardware was constructed, many conceptual ideas were formalized and brought to workable solutions as a result of the effort put forth at ANL.« less

  8. Imaging Tasks Scheduling for High-Altitude Airship in Emergency Condition Based on Energy-Aware Strategy

    PubMed Central

    Zhimeng, Li; Chuan, He; Dishan, Qiu; Jin, Liu; Manhao, Ma

    2013-01-01

    Aiming to the imaging tasks scheduling problem on high-altitude airship in emergency condition, the programming models are constructed by analyzing the main constraints, which take the maximum task benefit and the minimum energy consumption as two optimization objectives. Firstly, the hierarchy architecture is adopted to convert this scheduling problem into three subproblems, that is, the task ranking, value task detecting, and energy conservation optimization. Then, the algorithms are designed for the sub-problems, and the solving results are corresponding to feasible solution, efficient solution, and optimization solution of original problem, respectively. This paper makes detailed introduction to the energy-aware optimization strategy, which can rationally adjust airship's cruising speed based on the distribution of task's deadline, so as to decrease the total energy consumption caused by cruising activities. Finally, the application results and comparison analysis show that the proposed strategy and algorithm are effective and feasible. PMID:23864822

  9. Research on Power System Scheduling Improving Wind Power Accommodation Considering Thermal Energy Storage and Flexible Load

    NASA Astrophysics Data System (ADS)

    Zou, Chenlu; Cui, Xue; Wang, Heng; Zhou, Bin; Liu, Yang

    2018-01-01

    In the case of rapid development of wind power and heavy wind curtailment, the study of wind power accommodation of combined heat and power system has become the focus of attention. A two-stage scheduling model contains of wind power, thermal energy storage, CHP unit and flexible load were constructed. This model with the objective function of minimizing wind curtailment and the operation cost of units while taking into account of the total coal consumption of units, constraint of thermal energy storage and electricity-heat characteristic of CHP. This paper uses MICA to solve the problem of too many constraints and make the solution more feasible. A numerical example showed that the two stage decision scheduling model can consume more wind power, and it could provide a reference for combined heat and power system short-term operation

  10. Elementary Introduction to the Green Management of the Construction in Whole Process

    NASA Astrophysics Data System (ADS)

    Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi

    Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.

  11. Has climate change shifted US maize planting times?

    NASA Astrophysics Data System (ADS)

    Butler, E.; Stine, A.; Huybers, P.

    2012-12-01

    Global warming has been accompanied by an earlier onset of spring phenological events across a range of ecosystems. However, the degree to which humans have adapted planting schedules to a changing climate remains an open question; the leading hypotheses for earlier planting are improved hardiness of cultivars and farming equipment. Here we examine the relationship between historical temperature and precipitation from 549 weather stations from the United States Historical Climatology Network (USHCN) with planting schedules from 20 states in the United States Department of Agriculture/National Agriculture Statistics Service (USDA/NASS) database. We construct an empirical model to relate yearly weather conditions to predict planting dates and compare this to the spatial distribution of climate conditions and mean planting times. Evidence for a relationship between climate and planting schedules indicates that planting schedules for US maize have been adapted to yearly variations and overall changes in climatology. As one might expect, hotter temperatures lead to earlier plantings while greater precipitation leads to later planting. These findings serve to indicate extant adaptation between US farmers and climate change, and will aid in forecasting future shifts to planting schedules as climate continues to change. Furthermore, the statistical model should also be useful for estimating planting times for states and years for which records do not otherwise exist.

  12. George Lewis Addresses Staff during the Construction of the New Laboratory

    NASA Image and Video Library

    1942-05-21

    Construction Manager Raymond Sharp and the National Advisory Committee for Aeronautics (NACA) Director of Research George Lewis speak to employees during the May 8, 1942, Initiation of Research ceremony at the Aircraft Engine Research Laboratory. The event marked the first operation of a test facility at the new laboratory. The overall laboratory was still under construction, however, and behind schedule. Lewis traveled from his office in Washington, DC every week to personally assess the progress. Drastic measures were undertaken to accelerate the lab’s construction schedule. The military provided special supplies, contractors were given new agreements and pressured to meet deadlines, and Congress approved additional funds. The effort paid off and much of the laboratory was operational in early 1943. George Lewis managed the NACA’s aeronautical research for over 20 years. Lewis joined the NACA as Executive Officer in 1919, and was named Director of Aeronautical Research in 1924. In this role Lewis served as the liaison between the Executive Committee and the research laboratories. His most important accomplishment may have been the investigative tours of the research facilities in Germany in 1936 and 1939. The visits resulted in the NACA’s physical expansion and the broadening of the scope of its research. Lewis did not take a day of leave between the Pearl Harbor attack and the Armistice. He began suffering health problems in 1945 and was forced to retire two years later. The Aircraft Engine Research Laboratory was renamed the NACA Lewis Flight Propulsion Laboratory in September 1948.

  13. A real-time programming system.

    PubMed

    Townsend, H R

    1979-03-01

    The paper describes a Basic Operating and Scheduling System (BOSS) designed for a small computer. User programs are organised as self-contained modular 'processes' and the way in which the scheduler divides the time of the computer equally between them, while arranging for any process which has to respond to an interrupt from a peripheral device to be given the necessary priority, is described in detail. Next the procedures provided by the operating system to organise communication between processes are described, and how they are used to construct dynamically self-modifying real-time systems. Finally, the general philosophy of BOSS and applications to a multi-processor assembly are discussed.

  14. Spitzer Science operations: the good, the bad, and the ugly

    NASA Astrophysics Data System (ADS)

    Levine, Deborah A.

    2008-07-01

    We review the Spitzer Space Telescope Science Center operations teams and processes and their interfaces with other Project elements -- what we planned early in the development of the science center, what we had at a launch and what we have now and why. We also explore the checks and balances behind building an organizational structure that supports constructive airing of conflicts and a timely resolution that balances the inputs and provides for very efficient on-orbit operations. For example, what organizational roles are involved in reviewing observing schedules, what constituency do they represent and who has authority to approve or disapprove the schedule.

  15. 78 FR 12755 - Federal Acquisition Regulation; Submission for OMB Review; Schedules for Construction Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Paperwork Reduction Act, the Regulatory Secretariat will be submitting to the Office of Management and... contract when other management approaches for ensuring adequate progress are not used. If the Contractor... extension of the information collection would violate the fundamental purpose of the Paperwork Reduction Act...

  16. 48 CFR 452.236-75 - Maximum Workweek-Construction Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work. The maximum workweek that will be approved is __*. (End of clause) * Contracting... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Maximum Workweek...

  17. Procrastination Revisited: The Constructive Use of Delayed Response.

    ERIC Educational Resources Information Center

    Subotnik, Rena F.; And Others

    This study investigated patterns of procrastination in the domains of health, relationships, employment, and creative outlets in 19 former Westinghouse Science Talent Search winners, age 32 years. A model was synthesized from the available literature and an interview schedule of 14 open-ended items was developed to elicit self-assessments of…

  18. 40 CFR 35.937-3 - Evaluation of qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...

  19. 40 CFR 35.937-3 - Evaluation of qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...

  20. 40 CFR 35.937-3 - Evaluation of qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...

  1. 40 CFR 63.192 - Standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... product, as all operations collocated within a building or structure or as all affected operations at the... construction and reconstruction provisions of § 63.5(a), (b)(1), (b)(3), (d) (except the review is limited to... the intention to conduct a performance test at least 30 days before the performance test is scheduled...

  2. 18 CFR 4.25 - Findings.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.25... project shall be adjusted to conform to the actual legitimate cost as revised by the order of the Commission. These adjustments and the project may be audited by Commission representatives, as scheduled...

  3. 18 CFR 4.25 - Findings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.25... project shall be adjusted to conform to the actual legitimate cost as revised by the order of the Commission. These adjustments and the project may be audited by Commission representatives, as scheduled...

  4. 18 CFR 4.25 - Findings.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.25... project shall be adjusted to conform to the actual legitimate cost as revised by the order of the Commission. These adjustments and the project may be audited by Commission representatives, as scheduled...

  5. 18 CFR 4.25 - Findings.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.25... project shall be adjusted to conform to the actual legitimate cost as revised by the order of the Commission. These adjustments and the project may be audited by Commission representatives, as scheduled...

  6. 18 CFR 4.25 - Findings.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act § 4.25... project shall be adjusted to conform to the actual legitimate cost as revised by the order of the Commission. These adjustments and the project may be audited by Commission representatives, as scheduled...

  7. 12 CFR Appendix A to Subpart D of... - Interagency Guidelines for Real Estate Lending

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... comprehensive, and consistent with safe and sound lending practices, and must ensure that the institution... employment trends. • Zoning requirements. • Current and projected vacancy, construction, and absorption rates... property. • Maximum loan maturities by type of property. • Amortization schedules. • Pricing structure for...

  8. 12 CFR Appendix A to Subpart D of... - Interagency Guidelines for Real Estate Lending

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... comprehensive, and consistent with safe and sound lending practices, and must ensure that the institution... employment trends. • Zoning requirements. • Current and projected vacancy, construction, and absorption rates... property. • Maximum loan maturities by type of property. • Amortization schedules. • Pricing structure for...

  9. 12 CFR Appendix A to Subpart D of... - Interagency Guidelines for Real Estate Lending

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... comprehensive, and consistent with safe and sound lending practices, and must ensure that the institution... employment trends. • Zoning requirements. • Current and projected vacancy, construction, and absorption rates... property. • Maximum loan maturities by type of property. • Amortization schedules. • Pricing structure for...

  10. 12 CFR Appendix C to Part 208 - Interagency Guidelines for Real Estate Lending Policies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices... of property. • Amortization schedules. • Pricing structure for different types of real estate loans...

  11. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  12. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  13. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  14. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  15. 10 CFR 50.109 - Backfitting.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Backfitting. 50.109 Section 50.109 Energy NUCLEAR... of this chapter; (vi) The date of issuance of the first construction permit issued for a duplicate... paragraph (a)(3) of this section, the Commission will consider how the backfit should be scheduled in light...

  16. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...

  17. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...

  18. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...

  19. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...

  20. 76 FR 78645 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... touch upon impermissible subject matters because they may convey pricing information and bidding... FCC auction does not constitute an endorsement by the FCC of any particular service, technology, or... habitats, historical or archaeological sites, Indian religious sites, floodplains, and surface features. In...

  1. 78 FR 57179 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... temporary items). Records of printing services. 7. Department of Labor, Bureau of Labor Statistics (DAA-0257... used to track the costs of highway construction. 12. Office of the Director of National Intelligence, Office of the Deputy Director of National Intelligence for Intelligence Integration (N1-576-11-12), 13...

  2. 30 CFR 75.337 - Construction and repair of seals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be kept... quality control results to the District Manager for seal material properties specified by § 75.335 within...

  3. 30 CFR 75.337 - Construction and repair of seals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be kept... quality control results to the District Manager for seal material properties specified by § 75.335 within...

  4. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  5. 40 CFR 35.937-3 - Evaluation of qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules; (3) The candidate's capacity to perform the work (including any specialized... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.937-3...

  6. 50 CFR 259.34 - Minimum and maximum deposits; maximum time to deposit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... B objective. A time longer than 10 years, either by original scheduling or by subsequent extension... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE AID TO FISHERIES CAPITAL CONSTRUCTION FUND...) Minimum annual deposit. The minimum annual (based on each party's taxable year) deposit required by the...

  7. Constructing an Efficient Self-Tuning Aircraft Engine Model for Control and Health Management Applications

    NASA Technical Reports Server (NTRS)

    Armstrong, Jeffrey B.; Simon, Donald L.

    2012-01-01

    Self-tuning aircraft engine models can be applied for control and health management applications. The self-tuning feature of these models minimizes the mismatch between any given engine and the underlying engineering model describing an engine family. This paper provides details of the construction of a self-tuning engine model centered on a piecewise linear Kalman filter design. Starting from a nonlinear transient aerothermal model, a piecewise linear representation is first extracted. The linearization procedure creates a database of trim vectors and state-space matrices that are subsequently scheduled for interpolation based on engine operating point. A series of steady-state Kalman gains can next be constructed from a reduced-order form of the piecewise linear model. Reduction of the piecewise linear model to an observable dimension with respect to available sensed engine measurements can be achieved using either a subset or an optimal linear combination of "health" parameters, which describe engine performance. The resulting piecewise linear Kalman filter is then implemented for faster-than-real-time processing of sensed engine measurements, generating outputs appropriate for trending engine performance, estimating both measured and unmeasured parameters for control purposes, and performing on-board gas-path fault diagnostics. Computational efficiency is achieved by designing multidimensional interpolation algorithms that exploit the shared scheduling of multiple trim vectors and system matrices. An example application illustrates the accuracy of a self-tuning piecewise linear Kalman filter model when applied to a nonlinear turbofan engine simulation. Additional discussions focus on the issue of transient response accuracy and the advantages of a piecewise linear Kalman filter in the context of validation and verification. The techniques described provide a framework for constructing efficient self-tuning aircraft engine models from complex nonlinear simulations.Self-tuning aircraft engine models can be applied for control and health management applications. The self-tuning feature of these models minimizes the mismatch between any given engine and the underlying engineering model describing an engine family. This paper provides details of the construction of a self-tuning engine model centered on a piecewise linear Kalman filter design. Starting from a nonlinear transient aerothermal model, a piecewise linear representation is first extracted. The linearization procedure creates a database of trim vectors and state-space matrices that are subsequently scheduled for interpolation based on engine operating point. A series of steady-state Kalman gains can next be constructed from a reduced-order form of the piecewise linear model. Reduction of the piecewise linear model to an observable dimension with respect to available sensed engine measurements can be achieved using either a subset or an optimal linear combination of "health" parameters, which describe engine performance. The resulting piecewise linear Kalman filter is then implemented for faster-than-real-time processing of sensed engine measurements, generating outputs appropriate for trending engine performance, estimating both measured and unmeasured parameters for control purposes, and performing on-board gas-path fault diagnostics. Computational efficiency is achieved by designing multidimensional interpolation algorithms that exploit the shared scheduling of multiple trim vectors and system matrices. An example application illustrates the accuracy of a self-tuning piecewise linear Kalman filter model when applied to a nonlinear turbofan engine simulation. Additional discussions focus on the issue of transient response accuracy and the advantages of a piecewise linear Kalman filter in the context of validation and verification. The techniques described provide a framework for constructing efficient self-tuning aircraft engine models from complex nonlinear simulatns.

  8. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  9. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  10. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  11. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents computational results of these large-scale instances. To validate the models and solution algorithms developed, this thesis also compares the daily flight schedules that it designs with the schedules of the existing airlines. Furthermore, it creates instances that represent different economic and fuel-prices conditions and derives schedules under these different conditions. In addition, it discusses the implication of using new aircraft in the future flight schedules. Finally, future research in three areas---model, computational method, and simulation for validation---is proposed.

  12. 76 FR 66922 - Dominion Transmission, Incorporated; Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... scoping meetings scheduled as follows: FERC Public Scoping Meetings Myersville Compressor Station, 7:00 Mullett Compressor Station, p.m.--Monday, November 7, 2011, 7:00 p.m.--Tuesday, November Myersville... Planned Project DTI plans to construct and operate one new compressor station in both Frederick County...

  13. 75 FR 22792 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... of the outstanding non-tax delinquencies. 52. On the short-form application, an applicant must... Bureaus' previous guidance on default and delinquency disclosure requirements in the context of the short... 1.2106(a) regarding default and delinquency in connection with competitive bidding are limited to...

  14. 12 CFR Appendix A to Subpart A of... - Interagency Guidelines for Real Estate Lending Policies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices... of property. • Amortization schedules. • Pricing structure for different types of real estate loans...

  15. 12 CFR Appendix A to Subpart A of... - Interagency Guidelines for Real Estate Lending Policies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices... of property. • Amortization schedules. • Pricing structure for different types of real estate loans...

  16. Ray D. Nixon plant built below budget. [Colorado Springs, CO

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGlasson, W.J.

    1980-12-01

    The Ray D. Nixon plant was built in Colorado Springs at about $250,000 below the $100 million budgeted. Permit and operating deadlines provided important incentives to maintain the construction schedule, requiring intensive management efforts to keep cooperation and productivity high. The plant is also a model for environmental and wildlife protection. (DCK)

  17. Non-destructive testing (NDT) of a segmental concrete bridge scheduled for demolition, with a focus on condition assessment and corrosion detection of internal tendons.

    DOT National Transportation Integrated Search

    2017-05-01

    The service life and durability of prestressed concrete in bridges are vulnerable to corrosion damages due to many factors such as construction, material, and environment. To ensure public safety, it is important to inspect these structures and to de...

  18. Adverse Climatic Conditions and Impact on Construction Scheduling and Cost

    DTIC Science & Technology

    1988-01-01

    ABBREVIATIONS ABS MAX MAX TEMP ...... Absolute maximum maximum temperature ABS MIN MIN TEMP ...... Absolute minimum minimum temperature BTU...o Degrees Farenheit MEAN MAX TEMP o.................... Mean maximum temperature MEAN MIN TEMP...temperatures available, a determination had to be made as to whether forecasts were based on absolute , mean, or statistically derived temperatures

  19. The Classroom Flow and Engagement Experiences of Western Australian Rural and Remote Secondary School Students

    ERIC Educational Resources Information Center

    Cavanagh, Rob

    2014-01-01

    This paper commences with a brief examination of non-metropolitan student engagement and participation in schooling. It then describes how student engagement in classroom learning was conceptualised utilising Flow Theory. The key elements in this conception were subsequently used to construct an interview schedule. The characteristics of the…

  20. Optimal de novo design of MRM experiments for rapid assay development in targeted proteomics.

    PubMed

    Bertsch, Andreas; Jung, Stephan; Zerck, Alexandra; Pfeifer, Nico; Nahnsen, Sven; Henneges, Carsten; Nordheim, Alfred; Kohlbacher, Oliver

    2010-05-07

    Targeted proteomic approaches such as multiple reaction monitoring (MRM) overcome problems associated with classical shotgun mass spectrometry experiments. Developing MRM quantitation assays can be time consuming, because relevant peptide representatives of the proteins must be found and their retention time and the product ions must be determined. Given the transitions, hundreds to thousands of them can be scheduled into one experiment run. However, it is difficult to select which of the transitions should be included into a measurement. We present a novel algorithm that allows the construction of MRM assays from the sequence of the targeted proteins alone. This enables the rapid development of targeted MRM experiments without large libraries of transitions or peptide spectra. The approach relies on combinatorial optimization in combination with machine learning techniques to predict proteotypicity, retention time, and fragmentation of peptides. The resulting potential transitions are scheduled optimally by solving an integer linear program. We demonstrate that fully automated construction of MRM experiments from protein sequences alone is possible and over 80% coverage of the targeted proteins can be achieved without further optimization of the assay.

  1. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  2. Experience and limited lighting may affect sleepiness of tunnel workers

    PubMed Central

    2014-01-01

    Background Working on shifts, especially on a night shift, influences the endogenous sleep regulation system leading to diminished sleep time and increased somnolence. We attempted to evaluate the impact of shifts on sleepiness and correlate the sleepiness score to the experience in a shift schedule. Materials and methods This cross-sectional study consists of 42 male and 2 female workers involved in a tunnel construction. They underwent spirometry, pulse oximetry and were asked to complete the Epworth Sleepiness Scale questionnaire. Results Statistical analysis revealed that workers of lower Epworth had a mean age of 43.6 years, compared to the mean age of 36.4 years of workers with higher Epworth. Furthermore, workers of lower Epworth were characterized by a mean number of shift years equal to 14.8, while those of higher Epworth possessed a mean number of shift years equal to 8. The shift schedule did not reveal any statistically significant correlation. Conclusions Workers employed for a longer time had diminished sleepiness. However, there is no relationship between night shifts and sleepiness, possibly because of exposure to artificial lighting in the construction site. PMID:24993796

  3. Experience and limited lighting may affect sleepiness of tunnel workers.

    PubMed

    Lykouras, Dimosthenis; Karkoulias, Kiriakos; Patouchas, Dimitrios; Lakoumentas, John; Sampsonas, Fotis; Tranou, Magdalini-Konstantina; Faliagka, Evanthia; Tsakalidis, Athanasios; Spiropoulos, Kostas

    2014-07-03

    Working on shifts, especially on a night shift, influences the endogenous sleep regulation system leading to diminished sleep time and increased somnolence. We attempted to evaluate the impact of shifts on sleepiness and correlate the sleepiness score to the experience in a shift schedule. This cross-sectional study consists of 42 male and 2 female workers involved in a tunnel construction. They underwent spirometry, pulse oximetry and were asked to complete the Epworth Sleepiness Scale questionnaire. Statistical analysis revealed that workers of lower Epworth had a mean age of 43.6 years, compared to the mean age of 36.4 years of workers with higher Epworth. Furthermore, workers of lower Epworth were characterized by a mean number of shift years equal to 14.8, while those of higher Epworth possessed a mean number of shift years equal to 8. The shift schedule did not reveal any statistically significant correlation. Workers employed for a longer time had diminished sleepiness. However, there is no relationship between night shifts and sleepiness, possibly because of exposure to artificial lighting in the construction site.

  4. STS-97 crew arrives at KSC for launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the Shuttle Landing Facility, STS-97 Mission Specialist Joseph Tanner (left) is greeted by Center Director Roy Bridges on his arrival at KSC from Johnson Space Center. Tanner and the rest of the crew have returned to KSC for the launch, scheduled for Nov. 30 at about 10:06 p.m. EST. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST.

  5. KSC-00pp1756

    NASA Image and Video Library

    2000-11-27

    At the Shuttle Landing Facility, STS-97 Mission Specialist Joseph Tanner (left) is greeted by Center Director Roy Bridges on his arrival at KSC from Johnson Space Center. Tanner and the rest of the crew have returned to KSC for the launch, scheduled for Nov. 30 at about 10:06 p.m. EST. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST

  6. KSC-00pp1754

    NASA Image and Video Library

    2000-11-27

    At the Shuttle Landing Facility, STS-97 Pilot Michael Bloomfield climbs out of the cockpit of a T-38 jet aircraft he flew from Johnson Space Center. He and the rest of the crew have returned to KSC for the launch, scheduled for Nov. 30 at about 10:06 p.m. EST. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST

  7. KSC00pp1756

    NASA Image and Video Library

    2000-11-27

    At the Shuttle Landing Facility, STS-97 Mission Specialist Joseph Tanner (left) is greeted by Center Director Roy Bridges on his arrival at KSC from Johnson Space Center. Tanner and the rest of the crew have returned to KSC for the launch, scheduled for Nov. 30 at about 10:06 p.m. EST. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST

  8. KSC00pp1754

    NASA Image and Video Library

    2000-11-27

    At the Shuttle Landing Facility, STS-97 Pilot Michael Bloomfield climbs out of the cockpit of a T-38 jet aircraft he flew from Johnson Space Center. He and the rest of the crew have returned to KSC for the launch, scheduled for Nov. 30 at about 10:06 p.m. EST. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST

  9. FRIB cryogenic system status

    NASA Astrophysics Data System (ADS)

    Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.

    2017-12-01

    Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.

  10. A manpower scheduling heuristic for aircraft maintenance application

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng

    2012-09-01

    This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.

  11. Channel and Timeslot Co-Scheduling with Minimal Channel Switching for Data Aggregation in MWSNs

    PubMed Central

    Yeoum, Sanggil; Kang, Byungseok; Lee, Jinkyu; Choo, Hyunseung

    2017-01-01

    Collision-free transmission and efficient data transfer between nodes can be achieved through a set of channels in multichannel wireless sensor networks (MWSNs). While using multiple channels, we have to carefully consider channel interference, channel and time slot (resources) optimization, channel switching delay, and energy consumption. Since sensor nodes operate on low battery power, the energy consumed in channel switching becomes an important challenge. In this paper, we propose channel and time slot scheduling for minimal channel switching in MWSNs, while achieving efficient and collision-free transmission between nodes. The proposed scheme constructs a duty-cycled tree while reducing the amount of channel switching. As a next step, collision-free time slots are assigned to every node based on the minimal data collection delay. The experimental results demonstrate that the validity of our scheme reduces the amount of channel switching by 17.5%, reduces energy consumption for channel switching by 28%, and reduces the schedule length by 46%, as compared to the existing schemes. PMID:28471416

  12. Channel and Timeslot Co-Scheduling with Minimal Channel Switching for Data Aggregation in MWSNs.

    PubMed

    Yeoum, Sanggil; Kang, Byungseok; Lee, Jinkyu; Choo, Hyunseung

    2017-05-04

    Collision-free transmission and efficient data transfer between nodes can be achieved through a set of channels in multichannel wireless sensor networks (MWSNs). While using multiple channels, we have to carefully consider channel interference, channel and time slot (resources) optimization, channel switching delay, and energy consumption. Since sensor nodes operate on low battery power, the energy consumed in channel switching becomes an important challenge. In this paper, we propose channel and time slot scheduling for minimal channel switching in MWSNs, while achieving efficient and collision-free transmission between nodes. The proposed scheme constructs a duty-cycled tree while reducing the amount of channel switching. As a next step, collision-free time slots are assigned to every node based on the minimal data collection delay. The experimental results demonstrate that the validity of our scheme reduces the amount of channel switching by 17.5%, reduces energy consumption for channel switching by 28%, and reduces the schedule length by 46%, as compared to the existing schemes.

  13. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Planmore » for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.« less

  14. [Microcomputer control of a LED stimulus display device].

    PubMed

    Ohmoto, S; Kikuchi, T; Kumada, T

    1987-02-01

    A visual stimulus display system controlled by a microcomputer was constructed at low cost. The system consists of a LED stimulus display device, a microcomputer, two interface boards, a pointing device (a "mouse") and two kinds of software. The first software package is written in BASIC. Its functions are: to construct stimulus patterns using the mouse, to construct letter patterns (alphabet, digit, symbols and Japanese letters--kanji, hiragana, katakana), to modify the patterns, to store the patterns on a floppy disc, to translate the patterns into integer data which are used to display the patterns in the second software. The second software package, written in BASIC and machine language, controls display of a sequence of stimulus patterns in predetermined time schedules in visual experiments.

  15. Quasi-Linear Parameter Varying Representation of General Aircraft Dynamics Over Non-Trim Region

    NASA Technical Reports Server (NTRS)

    Shin, Jong-Yeob

    2007-01-01

    For applying linear parameter varying (LPV) control synthesis and analysis to a nonlinear system, it is required that a nonlinear system be represented in the form of an LPV model. In this paper, a new representation method is developed to construct an LPV model from a nonlinear mathematical model without the restriction that an operating point must be in the neighborhood of equilibrium points. An LPV model constructed by the new method preserves local stabilities of the original nonlinear system at "frozen" scheduling parameters and also represents the original nonlinear dynamics of a system over a non-trim region. An LPV model of the motion of FASER (Free-flying Aircraft for Subscale Experimental Research) is constructed by the new method.

  16. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  17. Critical path method applied to research project planning: Fire Economics Evaluation System (FEES)

    Treesearch

    Earl B. Anderson; R. Stanton Hales

    1986-01-01

    The critical path method (CPM) of network analysis (a) depicts precedence among the many activities in a project by a network diagram; (b) identifies critical activities by calculating their starting, finishing, and float times; and (c) displays possible schedules by constructing time charts. CPM was applied to the development of the Forest Service's Fire...

  18. 24 CFR 200.926c - Model code provisions for use in partially accepted code jurisdictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Minimum Property Standards § 200.926c Model code provisions for use in partially accepted code... partially accepted, then the properties eligible for HUD benefits in that jurisdiction shall be constructed..., those portions of one of the model codes with which the property must comply. Schedule for Model Code...

  19. 24 CFR 200.926c - Model code provisions for use in partially accepted code jurisdictions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Minimum Property Standards § 200.926c Model code provisions for use in partially accepted code... partially accepted, then the properties eligible for HUD benefits in that jurisdiction shall be constructed..., those portions of one of the model codes with which the property must comply. Schedule for Model Code...

  20. STS-115 Space Shuttle Atlantis docked on the ISS during Joint Operations

    NASA Image and Video Library

    2006-09-12

    S115-E-05722 (12 Sept. 2006) --- The Space Shuttle Atlantis will remain docked with the International Space Station like this for several more days as the STS-115 and Expedition 13 crewmembers join efforts to resume construction of the International Space Station. This image was taken during the first of three scheduled space walks.

  1. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael

    2002-11-30

    This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  2. Reconceptualizing Design-Build for More Efficient Budgeting and Scheduling

    ERIC Educational Resources Information Center

    Lynn, Rachel; Zirkle, Jennifer

    2012-01-01

    In 2009, the city of Detroit proposed a $500.5 million bond referendum to stem the declining enrollment in Detroit Public Schools (DPS) that mirrored the decades-long decline in the city's population. Proposal S was passed in November to fund the construction of 8 new schools, the renovation of 10 more, and the improvement of information…

  3. Network Approach to Autistic Traits: Group and Subgroup Analyses of ADOS Item Scores

    ERIC Educational Resources Information Center

    Anderson, George M.; Montazeri, Farhad; de Bildt, Annelies

    2015-01-01

    A network conceptualization might contribute to understanding the occurrence and interacting nature of behavioral traits in the autism realm. Networks were constructed based on correlations of item scores of the Autism Diagnostic Observation Schedule for Modules 1, 2 and 3 obtained for a group of 477 Dutch individuals with developmental disorders.…

  4. 18 CFR 35.13 - Filing of changes in rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... be reconciled with the utility's most recent FERC Form 1. If the utility has not yet submitted Form 1 for the Test Period, the utility shall submit the relevant Form 1 pages in draft form. (D) The utility.... Balance sheets shall be constructed in accordance with the annual report form for electric utilities...

  5. 18 CFR 35.13 - Filing of changes in rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... be reconciled with the utility's most recent FERC Form 1. If the utility has not yet submitted Form 1 for the Test Period, the utility shall submit the relevant Form 1 pages in draft form. (D) The utility.... Balance sheets shall be constructed in accordance with the annual report form for electric utilities...

  6. 18 CFR 35.13 - Filing of changes in rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... be reconciled with the utility's most recent FERC Form 1. If the utility has not yet submitted Form 1 for the Test Period, the utility shall submit the relevant Form 1 pages in draft form. (D) The utility.... Balance sheets shall be constructed in accordance with the annual report form for electric utilities...

  7. 18 CFR 35.13 - Filing of changes in rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... be reconciled with the utility's most recent FERC Form 1. If the utility has not yet submitted Form 1 for the Test Period, the utility shall submit the relevant Form 1 pages in draft form. (D) The utility.... Balance sheets shall be constructed in accordance with the annual report form for electric utilities...

  8. 18 CFR 35.13 - Filing of changes in rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... be reconciled with the utility's most recent FERC Form 1. If the utility has not yet submitted Form 1 for the Test Period, the utility shall submit the relevant Form 1 pages in draft form. (D) The utility.... Balance sheets shall be constructed in accordance with the annual report form for electric utilities...

  9. Urban Options Solar Greenhouse Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  10. 40 CFR 141.35 - Reporting for unregulated contaminant monitoring results.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... logs or construction drawings indicating that the representative well(s) is/are at a representative... after the first sampling event, as specified in Table 2 of § 141.40(a)(4)(i)(B), no notification to EPA... before and one month after the month in which the second sampling event is scheduled (i.e., it is not...

  11. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  12. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  13. National Pollutant Discharge Elimination System (NPDES) Permit Application Requirement for Storm Water Discharges

    DTIC Science & Technology

    1991-05-01

    schedule for construction, upgrading or operation of wastewater treatment facilities or any other environmental programs, which may effect storm water quality of...if the storm water quality may be similar. c. Two sets of samples are required to be collected: (1) A grab during the first 30 minutes of the rainfall

  14. Manned remote work station development article

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Flight article and associated design concepts are evaluated to meet fundamental requirements of a universal crew cabin to be used as a construction cherrypicker, a space crane turret, a railed work station, or a free flyer. Key technology developments are embodied into a simulation program. A schedule and simulation test plan matrix is given for the open cabin cherry picker.

  15. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  16. 40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...

  17. 48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...

  18. 48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...

  19. 48 CFR 852.236-83 - Payments under fixed-price construction contracts (including NAS).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall show on the critical path method (CPM) network the total cost of the guarantee period services in... prescribed in 832.111, insert the following clause in contracts that contain a section entitled “Network...) Failure either to meet schedules in Section Network Analysis System (NAS), or to process the Interim Arrow...

  20. STS-98 U.S. Lab Destiny rests in Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The U.S. Lab Destiny rests in the payload bay of Space Shuttle Atlantis. A key element in the construction of the International Space Station, Destiny is 28 feet long and weighs 16 tons. This research and command-and-control center is the most sophisticated and versatile space laboratory ever built. It will ultimately house a total of 23 experiment racks for crew support and scientific research. Destiny will fly on STS-98, the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  1. KSC-00pp1950

    NASA Image and Video Library

    2000-12-22

    In the Space Station Processing Facility, workers along the edge of the payload canister watch as the U.S. Lab Destiny is lowered into the canister. A key element in the construction of the International Space Station, Destiny is 28 feet long and weighs 16 tons. This research and command-and-control center is the most sophisticated and versatile space laboratory ever built. It will ultimately house a total of 23 experiment racks for crew support and scientific research. Destiny will fly on STS-98, the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST

  2. Models of resource planning during formation of calendar construction plans for erection of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Pocebneva, Irina; Belousov, Vadim; Fateeva, Irina

    2018-03-01

    This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.

  3. KSC01pp0088

    NASA Image and Video Library

    2001-01-03

    KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room at Launch Pad 39A, a technician works switches on the Payload Ground-Handling Mechanism hook instrumentation unit that will move the U.S. Lab Destiny out of the payload canister and into the PCR. Destiny will then be transferred to the payload bay of Atlantis for mission STS-98. Destiny, a key element in the construction of the International Space Station is designed for space science experiments. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST

  4. The Compact Ignition Tokamak and electron cyclotron heating: Description of need; assessment of prospects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ignat, D.W.; Cohn, D.R.; Woskov, P.P.

    1989-01-01

    The CIT will benefit from auxiliary heating of 10 to 40 MW. The schedules of both the CIT construction project and the operating plan contain adequate time to develop and implement ECH systems based on the gyrotron and the induction free electron laser (IFEL). Each approach has advantages and is the object of R and D at the level of many millions of dollars per year. While the gyrotron is further advanced in terms of power and pulse length achieved, rapid progress is scheduled for the IFEL, including experiments on tokamaks. Plans of CIT, gyrotron, and IFEL make 1992 anmore » appropriate time frame to commit to one or both systems. 12 refs., 8 figs., 2 tabs.« less

  5. A Systematic Multi-Time Scale Solution for Regional Power Grid Operation

    NASA Astrophysics Data System (ADS)

    Zhu, W. J.; Liu, Z. G.; Cheng, T.; Hu, B. Q.; Liu, X. Z.; Zhou, Y. F.

    2017-10-01

    Many aspects need to be taken into consideration in a regional grid while making schedule plans. In this paper, a systematic multi-time scale solution for regional power grid operation considering large scale renewable energy integration and Ultra High Voltage (UHV) power transmission is proposed. In the time scale aspect, we discuss the problem from month, week, day-ahead, within-day to day-behind, and the system also contains multiple generator types including thermal units, hydro-plants, wind turbines and pumped storage stations. The 9 subsystems of the scheduling system are described, and their functions and relationships are elaborated. The proposed system has been constructed in a provincial power grid in Central China, and the operation results further verified the effectiveness of the system.

  6. Forecasting Construction Cost Index based on visibility graph: A network approach

    NASA Astrophysics Data System (ADS)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  7. Radiology Architecture Project Primer.

    PubMed

    Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott

    2017-12-19

    The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  8. Scheduling Algorithm for the Large Synoptic Survey Telescope

    NASA Astrophysics Data System (ADS)

    Ichharam, Jaimal; Stubbs, Christopher

    2015-01-01

    The Large Synoptic Survey Telescope (LSST) is a wide-field telescope currently under construction and scheduled to be deployed in Chile by 2022 and operate for a ten-year survey. As a ground-based telescope with the largest etendue ever constructed, and the ability to take images approximately once every eighteen seconds, the LSST will be able to capture the entirety of the observable sky every few nights in six different band passes. With these remarkable features, LSST is primed to provide the scientific community with invaluable data in numerous areas of astronomy, including the observation of near-Earth asteroids, the detection of transient optical events such as supernovae, and the study of dark matter and energy through weak gravitational lensing.In order to maximize the utility that LSST will provide toward achieving these scientific objectives, it proves necessary to develop a flexible scheduling algorithm for the telescope which both optimizes its observational efficiency and allows for adjustment based on the evolving needs of the astronomical community.This work defines a merit function that incorporates the urgency of observing a particular field in the sky as a function of time elapsed since last observed, dynamic viewing conditions (in particular transparency and sky brightness), and a measure of scientific interest in the field. The problem of maximizing this merit function, summed across the entire observable sky, is then reduced to a classic variant of the dynamic traveling salesman problem. We introduce a new approximation technique that appears particularly well suited for this situation. We analyze its effectiveness in resolving this problem, obtaining some promising initial results.

  9. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  10. A multi-group and preemptable scheduling of cloud resource based on HTCondor

    NASA Astrophysics Data System (ADS)

    Jiang, Xiaowei; Zou, Jiaheng; Cheng, Yaodong; Shi, Jingyan

    2017-10-01

    Due to the features of virtual machine-flexibility, easy controlling and various system environments, more and more fields utilize the virtualization technology to construct the distributed system with the virtual resources, also including high energy physics. This paper introduce a method used in high energy physics that supports multiple resource group and preemptable cloud resource scheduling, combining virtual machine with HTCondor (a batch system). It makes resource controlling more flexible and more efficient and makes resource scheduling independent of job scheduling. Firstly, the resources belong to different experiment-groups, and the type of user-groups mapping to resource-groups(same as experiment-group) is one-to-one or many-to-one. In order to make the confused group simply to be managed, we designed the permission controlling component to ensure that the different resource-groups can get the suitable jobs. Secondly, for the purpose of elastically allocating resources for suitable resource-group, it is necessary to schedule resources like scheduling jobs. So this paper designs the cloud resource scheduling to maintain a resource queue and allocate an appropriate amount of virtual resources to the request resource-group. Thirdly, in some kind of situations, because of the resource occupied for a long time, resources need to be preempted. This paper adds the preemption function for the resource scheduling that implement resource preemption based on the group priority. Additionally, the way to preempting is soft that when virtual resources are preempted, jobs will not be killed but also be held and rematched later. It is implemented with the help of HTCondor, storing the held job information in scheduler, releasing the job to idle status and doing second matcher. In IHEP (institute of high energy physics), we have built a batch system based on HTCondor with a virtual resources pool based on Openstack. And this paper will show some cases of experiment JUNO and LHAASO. The result indicates that multi-group and preemptable resource scheduling is efficient to support multi-group and soft preemption. Additionally, the permission controlling component has been used in the local computing cluster, supporting for experiment JUNO, CMS and LHAASO, and the scale will be expanded to more experiments at the first half year, including DYW, BES and so on. Its evidence that the permission controlling is efficient.

  11. Modelling Temporal Schedule of Urban Trains Using Agent-Based Simulation and NSGA2-BASED Multiobjective Optimization Approaches

    NASA Astrophysics Data System (ADS)

    Sahelgozin, M.; Alimohammadi, A.

    2015-12-01

    Increasing distances between locations of residence and services leads to a large number of daily commutes in urban areas. Developing subway systems has been taken into consideration of transportation managers as a response to this huge amount of travel demands. In developments of subway infrastructures, representing a temporal schedule for trains is an important task; because an appropriately designed timetable decreases Total passenger travel times, Total Operation Costs and Energy Consumption of trains. Since these variables are not positively correlated, subway scheduling is considered as a multi-criteria optimization problem. Therefore, proposing a proper solution for subway scheduling has been always a controversial issue. On the other hand, research on a phenomenon requires a summarized representation of the real world that is known as Model. In this study, it is attempted to model temporal schedule of urban trains that can be applied in Multi-Criteria Subway Schedule Optimization (MCSSO) problems. At first, a conceptual framework is represented for MCSSO. Then, an agent-based simulation environment is implemented to perform Sensitivity Analysis (SA) that is used to extract the interrelations between the framework components. These interrelations is then taken into account in order to construct the proposed model. In order to evaluate performance of the model in MCSSO problems, Tehran subway line no. 1 is considered as the case study. Results of the study show that the model was able to generate an acceptable distribution of Pareto-optimal solutions which are applicable in the real situations while solving a MCSSO is the goal. Also, the accuracy of the model in representing the operation of subway systems was significant.

  12. Modelling the effects of booster dose vaccination schedules and recommendations for public health immunization programs: the case of Haemophilus influenzae serotype b.

    PubMed

    Charania, Nadia A; Moghadas, Seyed M

    2017-09-13

    Haemophilus influenzae serotype b (Hib) has yet to be eliminated despite the implementation of routine infant immunization programs. There is no consensus regarding the number of primary vaccine doses and an optimal schedule for the booster dose. We sought to evaluate the effect of a booster dose after receiving the primary series on the long-term disease incidence. A stochastic model of Hib transmission dynamics was constructed to compare the long-term impact of a booster vaccination and different booster schedules after receiving the primary series on the incidence of carriage and symptomatic disease. We parameterized the model with available estimates for the efficacy of Hib conjugate vaccine and durations of both vaccine-induced and naturally acquired immunity. We found that administering a booster dose substantially reduced the population burden of Hib disease compared to the scenario of only receiving the primary series. Comparing the schedules, the incidence of carriage for a 2-year delay (on average) in booster vaccination was comparable or lower than that observed for the scenario of booster dose within 1 year after primary series. The temporal reduction of symptomatic disease was similar in the two booster schedules, suggesting no superiority of one schedule over the other in terms of reducing the incidence of symptomatic disease. The findings underscore the importance of a booster vaccination for continued decline of Hib incidence. When the primary series provides a high level of protection temporarily, delaying the booster dose (still within the average duration of protection conferred by the primary series) may be beneficial to maintain longer-term protection levels and decelerate the decline of herd immunity in the population.

  13. HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

    NASA Technical Reports Server (NTRS)

    Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.

    2012-01-01

    HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

  14. Ant Colony Optimization for Mapping, Scheduling and Placing in Reconfigurable Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferrandi, Fabrizio; Lanzi, Pier Luca; Pilato, Christian

    Modern heterogeneous embedded platforms, com- posed of several digital signal, application specific and general purpose processors, also include reconfigurable devices support- ing partial dynamic reconfiguration. These devices can change the behavior of some of their parts during execution, allowing hardware acceleration of more sections of the applications. Never- theless, partial dynamic reconfiguration imposes severe overheads in terms of latency. For such systems, a critical part of the design phase is deciding on which processing elements (mapping) and when (scheduling) executing a task, but also how to place them on the reconfigurable device to guarantee the most efficient reuse of themore » programmable logic. In this paper we propose an algorithm based on Ant Colony Optimization (ACO) that simultaneously executes the scheduling, the mapping and the linear placing of tasks, hiding reconfiguration overheads through prefetching. Our heuristic gradually constructs solutions and then searches around the best ones, cutting out non-promising areas of the design space. We show how to consider the partial dynamic reconfiguration constraints in the scheduling, placing and mapping problems and compare our formulation to other heuristics that address the same problems. We demonstrate that our proposal is more general and robust, and finds better solutions (16.5% in average) with respect to competing solutions.« less

  15. The algorithm for duration acceleration of repetitive projects considering the learning effect

    NASA Astrophysics Data System (ADS)

    Chen, Hongtao; Wang, Keke; Du, Yang; Wang, Liwan

    2018-03-01

    Repetitive project optimization problem is common in project scheduling. Repetitive Scheduling Method (RSM) has many irreplaceable advantages in the field of repetitive projects. As the same or similar work is repeated, the proficiency of workers will be correspondingly low to high, and workers will gain experience and improve the efficiency of operations. This is learning effect. Learning effect is one of the important factors affecting the optimization results in repetitive project scheduling. This paper analyzes the influence of the learning effect on the controlling path in RSM from two aspects: one is that the learning effect changes the controlling path, the other is that the learning effect doesn't change the controlling path. This paper proposes corresponding methods to accelerate duration for different types of critical activities and proposes the algorithm for duration acceleration based on the learning effect in RSM. And the paper chooses graphical method to identity activities' types and considers the impacts of the learning effect on duration. The method meets the requirement of duration while ensuring the lowest acceleration cost. A concrete bridge construction project is given to verify the effectiveness of the method. The results of this study will help project managers understand the impacts of the learning effect on repetitive projects, and use the learning effect to optimize project scheduling.

  16. Design and Analysis of Self-Adapted Task Scheduling Strategies in Wireless Sensor Networks

    PubMed Central

    Guo, Wenzhong; Xiong, Naixue; Chao, Han-Chieh; Hussain, Sajid; Chen, Guolong

    2011-01-01

    In a wireless sensor network (WSN), the usage of resources is usually highly related to the execution of tasks which consume a certain amount of computing and communication bandwidth. Parallel processing among sensors is a promising solution to provide the demanded computation capacity in WSNs. Task allocation and scheduling is a typical problem in the area of high performance computing. Although task allocation and scheduling in wired processor networks has been well studied in the past, their counterparts for WSNs remain largely unexplored. Existing traditional high performance computing solutions cannot be directly implemented in WSNs due to the limitations of WSNs such as limited resource availability and the shared communication medium. In this paper, a self-adapted task scheduling strategy for WSNs is presented. First, a multi-agent-based architecture for WSNs is proposed and a mathematical model of dynamic alliance is constructed for the task allocation problem. Then an effective discrete particle swarm optimization (PSO) algorithm for the dynamic alliance (DPSO-DA) with a well-designed particle position code and fitness function is proposed. A mutation operator which can effectively improve the algorithm’s ability of global search and population diversity is also introduced in this algorithm. Finally, the simulation results show that the proposed solution can achieve significant better performance than other algorithms. PMID:22163971

  17. A STUDY ON IMPLEMENTATION OF PROCUREMENT MANAGEMENT METHOD THAT DELIVERLY'S UNCERTAINTY OF EQUIPMENTS, MATERIALS AND INSTRUCTIONS

    NASA Astrophysics Data System (ADS)

    Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki

    This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.

  18. Minimizing makespan in a two-stage flow shop with parallel batch-processing machines and re-entrant jobs

    NASA Astrophysics Data System (ADS)

    Huang, J. D.; Liu, J. J.; Chen, Q. X.; Mao, N.

    2017-06-01

    Against a background of heat-treatment operations in mould manufacturing, a two-stage flow-shop scheduling problem is described for minimizing makespan with parallel batch-processing machines and re-entrant jobs. The weights and release dates of jobs are non-identical, but job processing times are equal. A mixed-integer linear programming model is developed and tested with small-scale scenarios. Given that the problem is NP hard, three heuristic construction methods with polynomial complexity are proposed. The worst case of the new constructive heuristic is analysed in detail. A method for computing lower bounds is proposed to test heuristic performance. Heuristic efficiency is tested with sets of scenarios. Compared with the two improved heuristics, the performance of the new constructive heuristic is superior.

  19. Expert systems in civil engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kostem, C.N.; Maher, M.L.

    1986-01-01

    This book presents the papers given at a symposium on expert systems in civil engineering. Topics considered at the symposium included problem solving using expert system techniques, construction schedule analysis, decision making and risk analysis, seismic risk analysis systems, an expert system for inactive hazardous waste site characterization, an expert system for site selection, knowledge engineering, and knowledge-based expert systems in seismic analysis.

  20. Innovation Agents: Vocational Education and Training Skills and Innovation in Australian Industries and Firms. Volume 2

    ERIC Educational Resources Information Center

    Toner, Phillip; Marceau, Jane; Hall, Richard; Considine, Gillian

    2004-01-01

    This volume is a companion to "Innovation Agents: VET Skills and Innovation in Australian Industries and Firms. Volume 1". The detailed report of the project is contained in Volume 1 while Volume 2 contains the appendices: (1) Data tables for construction of the composite index of innovation; (2) Case study interview schedule; and (3)…

  1. 25 CFR 900.132 - Once a contract and/or grant is awarded, how will the Indian tribe or tribal organization receive...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... schedule for advance payments shall be developed based on progress, need, and other considerations in... project based on progress and need. (b) Payments shall be made to the Indian tribe or tribal organization... amounts measured by time or measured by phase of the project (e.g., planning, design, construction). (d...

  2. KC-46A Tanker Modernization (KC-46A)

    DTIC Science & Technology

    2013-12-01

    LRIP - Low Rate Initial Production $M - Millions of Dollars MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other...Related Qty - Quantity RDT&E - Research, Development, Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be...attributes, data correctness , data availability, and consistent data processing specified in the applicable joint and system integrated

  3. ARC-1968-A-41727-6-4

    NASA Image and Video Library

    1968-10-24

    Management process invaded Ames as the Center shifted from NACA to NASA oversight. Ames constructed a review room in its headquarters building where, in the graphical style that prevailed in the 1960's, Ames leadership could review progress against schedule, budget and performance measures. Shown, in October 1965 is Merrill Mead chief of Ames' program and resources office. (for H Julian Allen Retirement album)

  4. 49 CFR Appendix B to Part 213 - Schedule of Civil Penalties

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Automated vehicle-based inspection systems 5,000 7,500 213.335 Crossties (a) Material used 1,000 2,000 (b... 213.234 Automated inspection of track constructed with concrete crossties 5,000 7,500 213.235 Switches... (a) through (h) 5,000 7,500 213.345 Vehicle/track system qualification: (a) through (d) 5,000 7,500...

  5. Interprovincial has completed the 540-mile Norman Wells line

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowland, L.O.

    Interprovinial Pipe Line Ltd., has completed and is now operating the 540-mi., 12-in. crude trunkline from Norman Wells, Northwest Territories, to Zama, Alberta. This is the largest and the only significant pipe line to be built north of the provincial boundaries. Construction was completed a month ahead of schedule and was comfortably under budget, through two winter seasons.

  6. Accelerated stress testing of thin film solar cells: Development of test methods and preliminary results

    NASA Technical Reports Server (NTRS)

    Lathrop, J. W.

    1985-01-01

    If thin film cells are to be considered a viable option for terrestrial power generation their reliability attributes will need to be explored and confidence in their stability obtained through accelerated testing. Development of a thin film accelerated test program will be more difficult than was the case for crystalline cells because of the monolithic construction nature of the cells. Specially constructed test samples will need to be fabricated, requiring committment to the concept of accelerated testing by the manufacturers. A new test schedule appropriate to thin film cells will need to be developed which will be different from that used in connection with crystalline cells. Preliminary work has been started to seek thin film schedule variations to two of the simplest tests: unbiased temperature and unbiased temperature humidity. Still to be examined are tests which involve the passage of current during temperature and/or humidity stress, either by biasing in the forward (or reverse) directions or by the application of light during stress. Investigation of these current (voltage) accelerated tests will involve development of methods of reliably contacting the thin conductive films during stress.

  7. Particulate electron beam weld emission hazards in space

    NASA Technical Reports Server (NTRS)

    Bunton, Patrick H.

    1996-01-01

    The electron-beam welding process is well adapted to function in the environment of space. The Soviets were the first to demonstrate welding in space in the mid-1980's. Under the auspices of the International Space Welding Experiment (ISWE), an on-orbit test of a Ukrainian designed electron-beam welder (the Universal Hand Tool or 'UHT') is scheduled for October of 1997. The potential for sustained presence in space with the development of the international space station raises the possibility of the need for construction and repair in space. While welding is not scheduled to be used in the assembly of the space station, repair of damage from orbiting debris or meteorites is a potential need. Furthermore, safe and successful welding in the space environment may open new avenues for design and construction. The safety issue has been raised with regard to hot particle emissions (spatter) sometimes observed from the weld during operations. On earth the hot particles pose no particular hazard, but in space there exists the possibility for burn-through of the space suit which could be potentially lethal. Contamination of the payload bay by emitted particles could also be a problem.

  8. A commercial project for private investments. Update of the 280 MW api Energia IGCC plant construction in central Italy.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Bravo, R.; Pinacci, P.; Trifilo, R.

    1998-07-01

    This paper has the aim to give a general overview of the api Energia IGCC project starting from the project background in 1992 and ending with the progress of construction. api Energia S.p.A., a joint VENTURE between api anonima petroli italiana S.p.A., Roma, Italy (51%), ABB Sae Sadelmi S.p.A., Milano, Italy (25%) and Texaco Development Corporation (24%), is building a 280 MW Integrated Gasification Combined Cycle plant in the api refinery at Falconara Marittima, on Italy' s Adriatic coast, using heavy oil residues. The plant is based on the modern concept of employing a highly efficient combined cycle power plantmore » fed with a low heating value fuel gas produced by gasifying heavy refinery residues. This scheme provides consistent advantages in terms of efficiency and environmental impact over alternative applications of the refinery residues. The electric power produced will feed the national grid. The project has been financed using the ``project financing'' scheme: over 1,000 billion Lira, representing 75% of the overall capital requirement, have been provided by a pool of international banks. In November 1996 the project reached financial closure and immediately after the detailed design and procurement activities started. Engineering, Procurement and Construction activities, carried out by a Consortium of companies of the ABB group, are totally in line with the schedule. Commercial operation of the plant, is scheduled for November 1999.« less

  9. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    NASA Astrophysics Data System (ADS)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  10. Energy latency tradeoffs for medium access and sleep scheduling in wireless sensor networks

    NASA Astrophysics Data System (ADS)

    Gang, Lu

    Wireless sensor networks are expected to be used in a wide range of applications from environment monitoring to event detection. The key challenge is to provide energy efficient communication; however, latency remains an important concern for many applications that require fast response. The central thesis of this work is that energy efficient medium access and sleep scheduling mechanisms can be designed without necessarily sacrificing application-specific latency performance. We validate this thesis through results from four case studies that cover various aspects of medium access and sleep scheduling design in wireless sensor networks. Our first effort, DMAC, is to design an adaptive low latency and energy efficient MAC for data gathering to reduce the sleep latency. We propose staggered schedule, duty cycle adaptation, data prediction and the use of more-to-send packets to enable seamless packet forwarding under varying traffic load and channel contentions. Simulation and experimental results show significant energy savings and latency reduction while ensuring high data reliability. The second research effort, DESS, investigates the problem of designing sleep schedules in arbitrary network communication topologies to minimize the worst case end-to-end latency (referred to as delay diameter). We develop a novel graph-theoretical formulation, derive and analyze optimal solutions for the tree and ring topologies and heuristics for arbitrary topologies. The third study addresses the problem of minimum latency joint scheduling and routing (MLSR). By constructing a novel delay graph, the optimal joint scheduling and routing can be solved by M node-disjoint paths algorithm under multiple channel model. We further extended the algorithm to handle dynamic traffic changes and topology changes. A heuristic solution is proposed for MLSR under single channel interference. In the fourth study, EEJSPC, we first formulate a fundamental optimization problem that provides tunable energy-latency-throughput tradeoffs with joint scheduling and power control and present both exponential and polynomial complexity solutions. Then we investigate the problem of minimizing total transmission energy while satisfying transmission requests within a latency bound, and present an iterative approach which converges rapidly to the optimal parameter settings.

  11. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The U.S. Lab Destiny is ready to move into the orbiter'''s payload bay from the Payload Changeout Room. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  12. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Technicians in the Payload Changeout Room oversee the transfer of the U.S. Lab Destiny to the orbiter'''s payload bay. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  13. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Workers check out the U.S. Lab Destiny after it has been installed in Atlantis''' payload bay at the pad. Destiny, a key element in the construction of the International Space Station, is 28 feet long and weighs 16 tons. This research and command-and- control center is the most sophisticated and versatile space laboratory ever built. It will ultimately house a total of 23 experiment racks for crew support and scientific research. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  14. Measures of spiritual and transpersonal constructs for use in yoga research

    PubMed Central

    MacDonald, Douglas A; Friedman, Harris L

    2009-01-01

    This article presents information on standardized paper-and-pencil measures of spiritual and transpersonal constructs that hold promise for use in yoga research. Nine instruments are discussed at length including the Assessment Schedule for Altered States of Consciousness, Ego Grasping Orientation, Expressions of Spirituality Inventory, Hindu Religious Coping Scale, Measures of Hindu Pathways, Self-Expansiveness Level Form, Spiritual Orientation Inventory, Spiritual Transcendence Scale, and the Vedic Personality Inventory. As well, a listing of an additional 14 measures, along with primary citations, is provided. In conclusion, the authors proffer recommendations for the use of psychometric tests and provide a general proposal for programmatic research. PMID:21234209

  15. Towards Evolving Electronic Circuits for Autonomous Space Applications

    NASA Technical Reports Server (NTRS)

    Lohn, Jason D.; Haith, Gary L.; Colombano, Silvano P.; Stassinopoulos, Dimitris

    2000-01-01

    The relatively new field of Evolvable Hardware studies how simulated evolution can reconfigure, adapt, and design hardware structures in an automated manner. Space applications, especially those requiring autonomy, are potential beneficiaries of evolvable hardware. For example, robotic drilling from a mobile platform requires high-bandwidth controller circuits that are difficult to design. In this paper, we present automated design techniques based on evolutionary search that could potentially be used in such applications. First, we present a method of automatically generating analog circuit designs using evolutionary search and a circuit construction language. Our system allows circuit size (number of devices), circuit topology, and device values to be evolved. Using a parallel genetic algorithm, we present experimental results for five design tasks. Second, we investigate the use of coevolution in automated circuit design. We examine fitness evaluation by comparing the effectiveness of four fitness schedules. The results indicate that solution quality is highest with static and co-evolving fitness schedules as compared to the other two dynamic schedules. We discuss these results and offer two possible explanations for the observed behavior: retention of useful information, and alignment of problem difficulty with circuit proficiency.

  16. A multipopulation PSO based memetic algorithm for permutation flow shop scheduling.

    PubMed

    Liu, Ruochen; Ma, Chenlin; Ma, Wenping; Li, Yangyang

    2013-01-01

    The permutation flow shop scheduling problem (PFSSP) is part of production scheduling, which belongs to the hardest combinatorial optimization problem. In this paper, a multipopulation particle swarm optimization (PSO) based memetic algorithm (MPSOMA) is proposed in this paper. In the proposed algorithm, the whole particle swarm population is divided into three subpopulations in which each particle evolves itself by the standard PSO and then updates each subpopulation by using different local search schemes such as variable neighborhood search (VNS) and individual improvement scheme (IIS). Then, the best particle of each subpopulation is selected to construct a probabilistic model by using estimation of distribution algorithm (EDA) and three particles are sampled from the probabilistic model to update the worst individual in each subpopulation. The best particle in the entire particle swarm is used to update the global optimal solution. The proposed MPSOMA is compared with two recently proposed algorithms, namely, PSO based memetic algorithm (PSOMA) and hybrid particle swarm optimization with estimation of distribution algorithm (PSOEDA), on 29 well-known PFFSPs taken from OR-library, and the experimental results show that it is an effective approach for the PFFSP.

  17. A novel multi-item joint replenishment problem considering multiple type discounts.

    PubMed

    Cui, Ligang; Zhang, Yajun; Deng, Jie; Xu, Maozeng

    2018-01-01

    In business replenishment, discount offers of multi-item may either provide different discount schedules with a single discount type, or provide schedules with multiple discount types. The paper investigates the joint effects of multiple discount schemes on the decisions of multi-item joint replenishment. In this paper, a joint replenishment problem (JRP) model, considering three discount (all-unit discount, incremental discount, total volume discount) offers simultaneously, is constructed to determine the basic cycle time and joint replenishment frequencies of multi-item. To solve the proposed problem, a heuristic algorithm is proposed to find the optimal solutions and the corresponding total cost of the JRP model. Numerical experiment is performed to test the algorithm and the computational results of JRPs under different discount combinations show different significance in the replenishment cost reduction.

  18. Optimization of airport security process

    NASA Astrophysics Data System (ADS)

    Wei, Jianan

    2017-05-01

    In order to facilitate passenger travel, on the basis of ensuring public safety, the airport security process and scheduling to optimize. The stochastic Petri net is used to simulate the single channel security process, draw the reachable graph, construct the homogeneous Markov chain to realize the performance analysis of the security process network, and find the bottleneck to limit the passenger throughput. Curve changes in the flow of passengers to open a security channel for the initial state. When the passenger arrives at a rate that exceeds the processing capacity of the security channel, it is queued. The passenger reaches the acceptable threshold of the queuing time as the time to open or close the next channel, simulate the number of dynamic security channel scheduling to reduce the passenger queuing time.

  19. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN THE VAB SHOWS OPEN PARACHUTE

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  20. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN VAB WITH PARACHUTE HOISTED HIGH

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  1. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN VAB PRIOR TO ATTACHING PRESSURE VESSEL

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  2. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN THE VEHICLE ASSEMBLY BUILDING

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  3. The Floating Potential Probe (FPP) taken during the third EVA of STS-97

    NASA Image and Video Library

    2000-12-07

    STS097-376-029 (7 December 2000) --- Space walking Endeavour astronauts topped off their scheduled space walk activities with an image of an evergreen tree placed atop the P6 solar array structure, the highest point in their construction project. They then took this photo of the "tree" before returning to the shirt-sleeve environment of the Space Shuttle Endeavour.

  4. A Model of Inter-Organizational Influences on Organizational Processes

    DTIC Science & Technology

    1984-06-01

    organizational effectiveness (OE) programs in such organizations. These T-ograms have been diverse in their focus and activities , but most have had as a... activity is based on informal observation or inadequately constructed interview schedules or questionnaires which are strongly influenced by...of how diagnosis can serve as a basis for matching problem causes with appropriate corrective activities . Further, it is cledr that even among those

  5. Alternative Missions for the Army

    DTIC Science & Technology

    1992-07-17

    SECURITY CLASSIFICATION AUTHORITY 1.1I1 H I I BILITY OF REPORT 2b. DECLASSIFICATION /DOWNGRADING SCHEDULE Approved for public release; H ict-ri hiit ...construction, health care, transportation, and law enforcement. - Because they are already located in over 5,000 communities throughout the nation, the...various railway surveys. effectively building the nations first railroad, and also developed the cour.irys water resources through building or improving

  6. Loglines. May - June 2011

    DTIC Science & Technology

    2011-06-01

    chief of the Aerial Delivery and Textile Section. When orders for construction material peaked in 2010, the riggers helped pack about 200 air...ensures effective inspection programs and that SRM projects are scheduled to ensure critical defense missions can be fueled while the projects are...the Active Item Walk and Pick helps distribution workers quickly grab any of 8,000 items considered fast movers, such as washers and gaskets

  7. 40 CFR 62.15090 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... waste combustion unit and then restart my municipal waste combustion unit? 62.15090 Section 62.15090... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15090 What must I do if I close my municipal waste combustion unit and then restart...

  8. 40 CFR 62.15090 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... waste combustion unit and then restart my municipal waste combustion unit? 62.15090 Section 62.15090... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15090 What must I do if I close my municipal waste combustion unit and then restart...

  9. 40 CFR 62.15090 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... waste combustion unit and then restart my municipal waste combustion unit? 62.15090 Section 62.15090... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15090 What must I do if I close my municipal waste combustion unit and then restart...

  10. 40 CFR 62.15090 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... waste combustion unit and then restart my municipal waste combustion unit? 62.15090 Section 62.15090... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15090 What must I do if I close my municipal waste combustion unit and then restart...

  11. 40 CFR 62.15090 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste combustion unit and then restart my municipal waste combustion unit? 62.15090 Section 62.15090... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15090 What must I do if I close my municipal waste combustion unit and then restart...

  12. Improving Management of Military Construction Planning and Design

    DTIC Science & Technology

    1991-10-01

    waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing

  13. Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS)

    DTIC Science & Technology

    2013-12-01

    Initial Production $M - Millions of Dollars MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other PAUC - Program...RDT&E - Research, Development, Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be Determined TY - Then...completion, assess test results, correct short comings/deficiencies, and develop documentation to track and assess program status. On January 31

  14. Construct and Predictive Validity of the Alaska State High School Graduation Qualifying Examination: First Administration. Executive Summary.

    ERIC Educational Resources Information Center

    Stofflet, Fred; Fenton, Ray; Straugh, Tom

    In the year 2000, the Alaska High School Graduation Qualifying Examination (HSGQE) was given for the first time. The HSGQE is currently scheduled to be a graduation requirement for all students graduating as of January 2002, but early results from the use of the HSGQE in the Anchorage school district raise serious questions about the use of the…

  15. Mesa Verde--A Year-Round High School. A Descriptive Report of 1980-81.

    ERIC Educational Resources Information Center

    Housden, Terry; Holmes, Lynda

    Mesa Verde High School was constructed in 1974 and is the last high school built in the San Juan (California) Unified District. It serves students in grades 9 through 12 and has an open enrollment policy. Mesa Verde operates on a year-round schedule with students divided into three tracks. Basically, each track is in session for 9 weeks and then…

  16. East Europe Report.

    DTIC Science & Technology

    1987-02-05

    difficulties in order to finish on schedule and not to slow down the work tempo. The director of the coking plant under construction, Dr Engineer Piotr Dybala...Wlodzimierz Szewczynski, Stanislaw Janiak, Franciszek Piecuch, and Janusz Wieczorkiewicz . At the end of the meeting, General Tadeusz Szacilo, head of...have to be filled out and read turns activists into chairwarmers. Piotr Dziewit, POP secretary at the Koszarawa Gmina Office, reminisces, "I remember

  17. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... October 4, 2004. (2) You must submit a waste management plan no later than April 5, 2004. (3) You must...

  18. An Empirical Study of the Contracting Officer Representative’s Social Network

    DTIC Science & Technology

    2013-09-01

    any and all unforeseen environmental, explosive, safety , scheduling, and regulatory issues for the cleanup sites at APG that fall under the...wide range of investigative, remedial design, remedial construction, and remediation services required for hazardous substance and waste sites. This...engineering, data collection, and environmental remediation) than those previously examined ( food service and aircraft maintenance) as well, offering a broader

  19. Large Crawler Crane for new lightning protection system

    NASA Image and Video Library

    2007-10-25

    A large crawler crane traveling long one of the crawlerway tracks makes the turn toward Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  20. Large Crawler Crane for new lightning protection system

    NASA Image and Video Library

    2007-10-25

    A large crawler crane travels along one of the crawlerway tracks on its way to Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  1. Large Crawler Crane for new lightning protection system

    NASA Image and Video Library

    2007-10-25

    A large crawler crane moves past the Vehicle Assembly Building on its way to Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.

  2. Reserve valuation in electric power systems

    NASA Astrophysics Data System (ADS)

    Ruiz, Pablo Ariel

    Operational reliability is provided in part by scheduling capacity in excess of the load forecast. This reserve capacity balances the uncertain power demand with the supply in real time and provides for equipment outages. Traditionally, reserve scheduling has been ensured by enforcing reserve requirements in the operations planning. An alternate approach is to employ a stochastic formulation, which allows the explicit modeling of the sources of uncertainty. This thesis compares stochastic and reserve methods and evaluates the benefits of a combined approach for the efficient management of uncertainty in the unit commitment problem. Numerical studies show that the unit commitment solutions obtained for the combined approach are robust and superior with respect to the traditional approach. These robust solutions are especially valuable in areas with a high proportion of wind power, as their built-in flexibility allows the dispatch of practically all the available wind power while minimizing the costs of operation. The scheduled reserve has an economic value since it reduces the outage costs. In several electricity markets, reserve demand functions have been implemented to take into account the value of reserve in the market clearing process. These often take the form of a step-down function at the reserve requirement level, and as such they may not appropriately represent the reserve value. The value of reserve is impacted by the reliability, dynamic and stochastic characteristics of system components, the system operation policies, and the economic aspects such as the risk preferences of the demand. In this thesis, these aspects are taken into account to approximate the reserve value and construct reserve demand functions. Illustrative examples show that the demand functions constructed have similarities with those implemented in some markets.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heitzenroeder, P.; Dudek, Lawrence E.; Brooks, Arthur W.

    The National Compact Stellarator Experiment, NCSX, is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge national Laboratory. The goal of NCSX is to provide the understanding necessary to develop an attractive, disruption free, steady state compact stellaratorbased reactor design. This paper describes the recently revised designs of the critical interfaces between the modular coils, the construction solutions developed to meet assembly tolerances, and the recently revised trim coil system that provides the required compensation to correct for the “as built” conditions and to allow flexibility in the disposition of as-built conditions. In May,more » 2008, the sponsor decided to terminate the NCSX project due to growth in the project’s cost and schedule estimates. However significant technical challenges in design and construction were overcome, greatly reducing the risk in the remaining work to complete the project.« less

  4. Optimizing integrated airport surface and terminal airspace operations under uncertainty

    NASA Astrophysics Data System (ADS)

    Bosson, Christabelle S.

    In airports and surrounding terminal airspaces, the integration of surface, arrival and departure scheduling and routing have the potential to improve the operations efficiency. Moreover, because both the airport surface and the terminal airspace are often altered by random perturbations, the consideration of uncertainty in flight schedules is crucial to improve the design of robust flight schedules. Previous research mainly focused on independently solving arrival scheduling problems, departure scheduling problems and surface management scheduling problems and most of the developed models are deterministic. This dissertation presents an alternate method to model the integrated operations by using a machine job-shop scheduling formulation. A multistage stochastic programming approach is chosen to formulate the problem in the presence of uncertainty and candidate solutions are obtained by solving sample average approximation problems with finite sample size. The developed mixed-integer-linear-programming algorithm-based scheduler is capable of computing optimal aircraft schedules and routings that reflect the integration of air and ground operations. The assembled methodology is applied to a Los Angeles case study. To show the benefits of integrated operations over First-Come-First-Served, a preliminary proof-of-concept is conducted for a set of fourteen aircraft evolving under deterministic conditions in a model of the Los Angeles International Airport surface and surrounding terminal areas. Using historical data, a representative 30-minute traffic schedule and aircraft mix scenario is constructed. The results of the Los Angeles application show that the integration of air and ground operations and the use of a time-based separation strategy enable both significant surface and air time savings. The solution computed by the optimization provides a more efficient routing and scheduling than the First-Come-First-Served solution. Additionally, a data driven analysis is performed for the Los Angeles environment and probabilistic distributions of pertinent uncertainty sources are obtained. A sensitivity analysis is then carried out to assess the methodology performance and find optimal sampling parameters. Finally, simulations of increasing traffic density in the presence of uncertainty are conducted first for integrated arrivals and departures, then for integrated surface and air operations. To compare the optimization results and show the benefits of integrated operations, two aircraft separation methods are implemented that offer different routing options. The simulations of integrated air operations and the simulations of integrated air and surface operations demonstrate that significant traveling time savings, both total and individual surface and air times, can be obtained when more direct routes are allowed to be traveled even in the presence of uncertainty. The resulting routings induce however extra take off delay for departing flights. As a consequence, some flights cannot meet their initial assigned runway slot which engenders runway position shifting when comparing resulting runway sequences computed under both deterministic and stochastic conditions. The optimization is able to compute an optimal runway schedule that represents an optimal balance between total schedule delays and total travel times.

  5. Application of the Life Safety Code to a Historic Test Stand

    NASA Technical Reports Server (NTRS)

    Askins, Bruce; Lemke, Paul R.; Lewis, William L.; Covell, Carol C.

    2011-01-01

    NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.

  6. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  7. Minimizing delays in the Jordanian construction industry by adopting BIM technology

    NASA Astrophysics Data System (ADS)

    Btoush, M.; Harun, A. T.

    2017-11-01

    The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.

  8. Comparision of photogrammetric point clouds with BIM building elements for construction progress monitoring

    NASA Astrophysics Data System (ADS)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2014-08-01

    For construction progress monitoring a planned state of the construction at a certain time (as-planed) has to be compared to the actual state (as-built). The as-planed state is derived from a building information model (BIM), which contains the geometry of the building and the construction schedule. In this paper we introduce an approach for the generation of an as-built point cloud by photogrammetry. It is regarded that that images on a construction cannot be taken from everywhere it seems to be necessary. Because of this we use a combination of structure from motion process together with control points to create a scaled point cloud in a consistent coordinate system. Subsequently this point cloud is used for an as-built - as-planed comparison. For that voxels of an octree are marked as occupied, free or unknown by raycasting based on the triangulated points and the camera positions. This allows to identify not existing building parts. For the verification of the existence of building parts a second test based on the points in front and behind the as-planed model planes is performed. The proposed procedure is tested based on an inner city construction site under real conditions.

  9. Validation of World Health Organization Assessment Schedule 2.0 in specialized somatic rehabilitation services in Norway.

    PubMed

    Moen, Vegard Pihl; Drageset, Jorunn; Eide, Geir Egil; Klokkerud, Mari; Gjesdal, Sturla

    2017-02-01

    The World Health Organization Disability Assessment Schedule (WHODAS) 2.0 is a generic instrument to assess disability covering six domains. The purpose of this study was to investigate the potential of the instrument for monitoring disability in specialized somatic rehabilitation by testing reliability, construct validity and responsiveness of WHODAS 2.0, Norwegian version, among patients with various health conditions. For taxonomy, terminology and definitions, the Consensus-based Standards for the Selection of Health Measurement Instruments were followed. Reproducibility was investigated by the intra-class correlation coefficient (ICC) in a randomly selected sample. Internal consistency was assessed by Cronbach's alpha. Construct validity was evaluated by correlations between WHODAS 2.0 and the Medical Outcomes Study 36-item Short Form, and fit of the hypothesized structure using confirmatory factor analysis (CFA). Responsiveness was evaluated in another randomly selected sample by testing a priori formulated hypotheses. Nine hundred seventy patients were included in the study. Reproducibility and responsiveness were evaluated in 53 and 104 patients, respectively. The ICC for the WHODAS 2.0 domains ranged from 0.63 to 0.84 and was 0.87 for total score. Cronbach's alpha for domains ranged from 0.75 to 0.94 and was 0.93 for total score. For construct validity, 6 of 12 expected correlations were confirmed and CFA did not achieve satisfactory fit indices. For responsiveness, 3 of 8 hypotheses were confirmed. The Norwegian version of WHODAS 2.0 showed moderate to satisfactory reliability and moderate validity in rehabilitation patients. However, the present study indicated possible limitations in terms of responsiveness.

  10. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Workers in the Payload Changeout Room check the movement of the U.S. Lab Destiny, which is being transferred to the orbiter'''s payload bay. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  11. STS-98 crew talks about the mission during a media briefing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- STS-98 Commander Ken Cockrell answers a question from the media during a briefing at Launch Pad 39A. Other crew members present are Pilot Mark Polansky, Mission Specialist Thomas Jones, [Cockrell], and Mission Specialists Marsha Ivins and Robert Curbeam. All are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m.

  12. STS-98 crew talks about the mission during a media briefing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Four members of the STS-98 crew pose for a photo at Launch Pad 39A. Standing, left to right, are Mission Specialist Robert Curbeam, Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialist Thomas Jones. Not pictured is Mission Specialist Marsha Ivins. The crew is at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m.

  13. STS-98 crew poses for photo after media briefing

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- After a media briefing at Launch Pad 39A, the STS-98 crew poses in the slidewire basket landing zone. Standing, left to right, are Pilot Mark Polansky, Mission Specialist Thomas Jones, Commander Ken Cockrell and Mission Specialists Marsha Ivins and Robert Curbeam. All are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m.

  14. The new 34-meter antenna

    NASA Technical Reports Server (NTRS)

    Pompa, M. F.

    1986-01-01

    The new 34-m high efficiency Azimuth - Elevation antenna configuration, including its features, dynamic characteristics and performance at 8.4-GHz frequencies is described. The current-technology features of this antenna produce a highly reliable configuration by incorporation of a main wheel and track azimuth support, central pintle pivot bearing, close tolerance surface panels and all-welded construction. Also described are basic drive controls that, as slaved to three automatic microprocessors, provide accurate and safe control of the antenna's steering tasks. At this time antenna installations are completed at Goldstone and Canberra and have operationally supported the Voyager - Uranus encounter. A third installation is being constructed currently in Madrid and is scheduled for completion in late 1986.

  15. KSC-01pp0075

    NASA Image and Video Library

    2001-01-05

    In the White Room, STS-98 Mission Specialist Thomas Jones gets help with his launch and entry suit before entering Atlantis for a simulated launch countdown. The White Room is an environmental chamber at the end of the orbiter access arm that mates with the orbiter to allow personnel to enter the orbiter’s crew compartment. The STS-98 crew is taking part in Terminal Countdown Demonstration Test activities, which also include emergency egress training at the pad. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST

  16. KSC-01pp0076

    NASA Image and Video Library

    2001-01-05

    In the White Room, STS-98 Pilot Mark Polansky gets help with his launch and entry suit before entering Atlantis for a simulated launch countdown. The White Room is an environmental chamber at the end of the orbiter access arm that mates with the orbiter to allow personnel to enter the orbiter’s crew compartment. The STS-98 crew is taking part in Terminal Countdown Demonstration Test activities, which also include emergency egress training at the pad. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST

  17. KSC-01pp0074

    NASA Image and Video Library

    2001-01-05

    In the White Room, STS-98 Mission Specialists Robert Curbeam and Marsha Ivins pose for a photo before entering Atlantis for a simulated launch countdown. The White Room is an environmental chamber at the end of the orbiter access arm that mates with the orbiter to allow personnel to enter the orbiter’s crew compartment. The STS-98 crew is taking part in Terminal Countdown Demonstration Test activities, which also include emergency egress training at the pad. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST

  18. The embedded operating system project

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  19. Development of a Novel Segmental Bone Defect Construct

    DTIC Science & Technology

    2017-10-01

    differentiation, and biological activity of both primary synoviocytes and bone marrow derived connective tissue progenitor cells. During the majority of...halted activity on the project from the dates of 31 May 2016 to 13 July 2017. However, the project is on schedule with the current, revised project...supervised all project activities and participated in the preparation of the manuscript that was produced during this reporting period. Name: Dr

  20. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The orbiter Atlantis heads toward the open door of the Vehicle Assembly Building (VAB) on the north side. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  1. Walheim and Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008200 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel (top) and NASA astronaut Rex Walheim, both STS-122 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Walheim and Schlegel worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  2. Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008315 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  3. Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008195 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  4. Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008325 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  5. Walheim and Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008199 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel (right) and NASA astronaut Rex Walheim, both STS-122 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Walheim and Schlegel worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  6. Schlegel during EVA 2

    NASA Image and Video Library

    2008-02-13

    S122-E-008219 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.

  7. 40 CFR 62.15095 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... close my municipal waste combustion unit and not restart it? 62.15095 Section 62.15095 Protection of... Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15095 What must I do if I plan to permanently close my municipal waste combustion unit and not restart...

  8. 40 CFR 62.15095 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... close my municipal waste combustion unit and not restart it? 62.15095 Section 62.15095 Protection of... Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15095 What must I do if I plan to permanently close my municipal waste combustion unit and not restart...

  9. 40 CFR 62.15095 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... close my municipal waste combustion unit and not restart it? 62.15095 Section 62.15095 Protection of... Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15095 What must I do if I plan to permanently close my municipal waste combustion unit and not restart...

  10. 40 CFR 62.15095 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... close my municipal waste combustion unit and not restart it? 62.15095 Section 62.15095 Protection of... Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15095 What must I do if I plan to permanently close my municipal waste combustion unit and not restart...

  11. 40 CFR 62.15095 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... close my municipal waste combustion unit and not restart it? 62.15095 Section 62.15095 Protection of... Combustion Units Constructed on or Before August 30, 1999 Compliance Schedule and Increments of Progress § 62.15095 What must I do if I plan to permanently close my municipal waste combustion unit and not restart...

  12. Command History. United States Military Assistance Command, Vietnam 1968. Volume 2

    DTIC Science & Technology

    1968-01-01

    phase of the 1968 plan was put through ae scheduled. The opening of the Tte Offensive. however, temporarily scuttled the program. Temporarily, local...decrease slightly. Completed construction of an additional 1, 200 km oalhighways and tte restoration of more of the VNRS was expected to materialize in...Assistance Program MINRON Mine Squadron \\05 Military Intelligence Service MISC Mobile Infiltration Surveillance Center MIUWG Mobile Inshore Undersea

  13. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Inside the Vehicle Assembly Building (VAB), overhead cranes move above the orbiter Atlantis in order to lift it to vertical. When vertical, the orbiter will be placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  14. Reconciling the Disconnect between Information Technology and Information Systems Using an Organizational Epistemology: A Framework to Improve Success with Technology

    ERIC Educational Resources Information Center

    Powell, Christopher R.

    2010-01-01

    There is a disconnect between information technology (IT) and information systems (IS) that lies at the foundation of frequent failure in cost, schedule, and/or performance of IT/IS. This disconnect can perhaps be reconciled through a focus on the socially constructed and emergent nature of IT as it enters and is used by an organization. The…

  15. A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

    NASA Technical Reports Server (NTRS)

    Taylor, Edith C.; Ross, Michael

    1989-01-01

    The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

  16. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  17. A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

    NASA Technical Reports Server (NTRS)

    Heere, Karen R.; Zelenka, Richard E.

    2000-01-01

    Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

  18. Novel reinforcement learning paradigm based on response patterning under interval schedules of reinforcement.

    PubMed

    Schifani, Christin; Sukhanov, Ilya; Dorofeikova, Mariia; Bespalov, Anton

    2017-07-28

    There is a need to develop cognitive tasks that address valid neuropsychological constructs implicated in disease mechanisms and can be used in animals and humans to guide novel drug discovery. Present experiments aimed to characterize a novel reinforcement learning task based on a classical operant behavioral phenomenon observed in multiple species - differences in response patterning under variable (VI) vs fixed interval (FI) schedules of reinforcement. Wistar rats were trained to press a lever for food under VI30s and later weekly test sessions were introduced with reinforcement schedule switched to FI30s. During the FI30s test session, post-reinforcement pauses (PRPs) gradually grew towards the end of the session reaching 22-43% of the initial values. Animals could be retrained under VI30s conditions, and FI30s test sessions were repeated over a period of several months without appreciable signs of a practice effect. Administration of the non-competitive N-methyl-d-aspartate (NMDA) receptor antagonist MK-801 ((5S,10R)-(+)-5-Methyl-10,11-dihydro-5H-dibenzo[a,d]cyclohepten-5,10-imine maleate) prior to FI30s sessions prevented adjustment of PRPs associated with the change from VI to FI schedule. This effect was most pronounced at the highest tested dose of MK-801 and appeared to be independent of the effects of this dose on response rates. These results provide initial evidence for the possibility to use different response patterning under VI and FI schedules with equivalent reinforcement density for studying effects of drug treatment on reinforcement learning. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. The "Goldilocks model" of overtime in construction: not too much, not too little, but just right.

    PubMed

    Goldenhar, Linda M; Hecker, Steven; Moir, Susan; Rosecrance, John

    2003-01-01

    Little research exists on the relationship between working overtime and possible adverse health and safety outcomes for construction workers. Five focus-group discussions were conducted with construction workers from around the United States. From the analyzed transcripts, a model of overtime was developed. The model includes three dominant themes: (1) work organization issues [(a) definitions of overtime, (b) scheduling, and (c) economic conditions], (2) why workers choose to work overtime [(a) management expectations, (b) career, and (c) money], and (3) the effects of working overtime [(a) health and safety, including sleep deprivation, injury, fatigue, and stress, and (b) productivity]. Health and safety is only one of the adverse outcomes related to working too much overtime. A list of worker-inspired recommendations for addressing overtime issues is provided. Both employers and workers need to better understand the potential adverse effects of working too much overtime.

  20. A Multipopulation PSO Based Memetic Algorithm for Permutation Flow Shop Scheduling

    PubMed Central

    Liu, Ruochen; Ma, Chenlin; Ma, Wenping; Li, Yangyang

    2013-01-01

    The permutation flow shop scheduling problem (PFSSP) is part of production scheduling, which belongs to the hardest combinatorial optimization problem. In this paper, a multipopulation particle swarm optimization (PSO) based memetic algorithm (MPSOMA) is proposed in this paper. In the proposed algorithm, the whole particle swarm population is divided into three subpopulations in which each particle evolves itself by the standard PSO and then updates each subpopulation by using different local search schemes such as variable neighborhood search (VNS) and individual improvement scheme (IIS). Then, the best particle of each subpopulation is selected to construct a probabilistic model by using estimation of distribution algorithm (EDA) and three particles are sampled from the probabilistic model to update the worst individual in each subpopulation. The best particle in the entire particle swarm is used to update the global optimal solution. The proposed MPSOMA is compared with two recently proposed algorithms, namely, PSO based memetic algorithm (PSOMA) and hybrid particle swarm optimization with estimation of distribution algorithm (PSOEDA), on 29 well-known PFFSPs taken from OR-library, and the experimental results show that it is an effective approach for the PFFSP. PMID:24453841

Top