Sample records for construction site managers

  1. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  2. Critical management practices influencing on-site waste minimization in construction projects.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects

    NASA Astrophysics Data System (ADS)

    Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui

    2010-06-01

    The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.

  4. Protocol for a mixed-methods study on leader-based interventions in construction contractors' safety commitments.

    PubMed

    Pedersen, Betina Holbaek; Dyreborg, Johnny; Kines, Pete; Mikkelsen, Kim Lyngby; Hannerz, Harald; Andersen, Dorte Raaby; Spangenberg, Søren

    2010-06-01

    Owing to high injury rates, safety interventions are needed in the construction industry. Evidence-based interventions tailored to this industry are, however, scarce. Leader-based safety interventions have proven more effective than worker-based interventions in other industries. To test a leader-based safety intervention for construction sites. The intervention consists of encouraging safety coordinators to provide feedback on work safety to the client and line management. The intention is to increase communication and interactions regarding safety within the line management and between the client and the senior management. It is hypothesised that this, in turn, will lead to increased communication and interaction about safety between management and coworkers as well as an increased on-site safety level. A group-randomised double-blinded case study of six Danish construction sites (three intervention sites and three control sites). The recruitment of the construction sites is performed continuously from January 2010 to June 2010. The investigation of each site lasts 20 continuous weeks. Confirmatory statistical analysis is used to test if the safety level increased, and if the probability of safety communications between management and coworkers increases as a consequence of the intervention. The data collection will be blinded. Qualitative methods are used to evaluate if communication and interactions about safety at all managerial levels, including the client, increase. (1) The proportion of safety-related communications out of all studied communications between management and coworkers. (2) The safety level index of the construction sites.

  5. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  6. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  7. 48 CFR 915.404-4-71-6 - Fee base.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...

  8. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  9. Feasibility Study on UAV-assisted Construction Surplus Soil Tracking Control and Management Technique

    NASA Astrophysics Data System (ADS)

    Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen

    2018-01-01

    Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.

  10. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    PubMed Central

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176

  11. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    PubMed

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  12. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  13. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  14. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  15. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  16. 48 CFR 49.105-4 - Cleanup of construction site.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cleanup of construction site. 49.105-4 Section 49.105-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105-4 Cleanup of construction site. In...

  17. 3D-Web-GIS RFID location sensing system for construction objects.

    PubMed

    Ko, Chien-Ho

    2013-01-01

    Construction site managers could benefit from being able to visualize on-site construction objects. Radio frequency identification (RFID) technology has been shown to improve the efficiency of construction object management. The objective of this study is to develop a 3D-Web-GIS RFID location sensing system for construction objects. An RFID 3D location sensing algorithm combining Simulated Annealing (SA) and a gradient descent method is proposed to determine target object location. In the algorithm, SA is used to stabilize the search process and the gradient descent method is used to reduce errors. The locations of the analyzed objects are visualized using the 3D-Web-GIS system. A real construction site is used to validate the applicability of the proposed method, with results indicating that the proposed approach can provide faster, more accurate, and more stable 3D positioning results than other location sensing algorithms. The proposed system allows construction managers to better understand worksite status, thus enhancing managerial efficiency.

  18. 3D-Web-GIS RFID Location Sensing System for Construction Objects

    PubMed Central

    2013-01-01

    Construction site managers could benefit from being able to visualize on-site construction objects. Radio frequency identification (RFID) technology has been shown to improve the efficiency of construction object management. The objective of this study is to develop a 3D-Web-GIS RFID location sensing system for construction objects. An RFID 3D location sensing algorithm combining Simulated Annealing (SA) and a gradient descent method is proposed to determine target object location. In the algorithm, SA is used to stabilize the search process and the gradient descent method is used to reduce errors. The locations of the analyzed objects are visualized using the 3D-Web-GIS system. A real construction site is used to validate the applicability of the proposed method, with results indicating that the proposed approach can provide faster, more accurate, and more stable 3D positioning results than other location sensing algorithms. The proposed system allows construction managers to better understand worksite status, thus enhancing managerial efficiency. PMID:23864821

  19. The morphological development of newly inundated intertidal areas: the mechanisms driving the early evolution of an estuarine environment designed and constructed by humans

    NASA Astrophysics Data System (ADS)

    Dale, Jonathan; Burgess, Heidi; Cundy, Andrew

    2017-04-01

    Intertidal saltmarsh and mudflat habitats are of global importance due to the ecosystem, economic and cultural services they provide. These services include wildlife habitat provision and species diversity, immobilisation of pollutants and protection from coastal flooding. Saltmarsh and mudflat environments are, however, being lost and degraded due to erosion caused by rising sea levels and increased storminess. These losses are exacerbated by anthropogenic influences including land reclamation, increased coastal development and the construction of coastal flood defences which prevent the landwards migration of saltmarsh and mudflat environments, resulting in coastal squeeze. To compensate for saltmarsh and mudflat losses areas of the coastal hinterland are being inundated by breaching defences and constructing new defences inland, thus extending or constructing new estuarine environments; a processes known as de-embankment or managed realignment. Morphological engineering and landscaping within managed realignment sites prior to site inundation varies depending on the aims of the scheme. However, there is a shortage of data on the morphological evolution within these sites post site inundation impeding the ability of coastal engineers to effectively design and construct future sites. To date there has been a focus on the colonisation of marine macro fauna and flora within newly inundated managed realignment sites, which can be relatively rapid and easily quantified. Little is known of the morphological evolution in response to altered sedimentary processes, its driving mechanisms and therefore the success and ecological sustainability of these sites. This study evaluates the post-inundation morphological development of the largest open coast managed realignment site in Europe, at Medmerry on the south coast of the United Kingdom. Inundated in September 2013, the Medmerry Managed Realignment Site consists of a mosaic of former agricultural land and areas of lower elevation excavated during site construction, drained by a series of natural and engineered channels. Results indicate different rates and patterns of sedimentation and resulting morphology across the site. Near the breach continuous sedimentation of > 15cm over a 1 year period was measured, compared to rhythmic periods of accretion and erosion inland. These variations have been related to site design, former land-use and different sediment sources. The evolution of developing creek networks, formed by pluvial action and sediment "piping", are controlled by unconformities found in the sub-surface sediment related to Holocene site evolution. Analysis of the sedimentary processes and subsequent morphological development of these areas provides a new insight into coastal and estuarine evolution in an anthropogenically designed and constructed estuarine environment.

  20. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    NASA Astrophysics Data System (ADS)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  1. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies.

    PubMed

    Cheung, Weng-Fong; Lin, Tzu-Hsuan; Lin, Yu-Cheng

    2018-02-02

    In recent years, many studies have focused on the application of advanced technology as a way to improve management of construction safety management. A Wireless Sensor Network (WSN), one of the key technologies in Internet of Things (IoT) development, enables objects and devices to sense and communicate environmental conditions; Building Information Modeling (BIM), a revolutionary technology in construction, integrates database and geometry into a digital model which provides a visualized way in all construction lifecycle management. This paper integrates BIM and WSN into a unique system which enables the construction site to visually monitor the safety status via a spatial, colored interface and remove any hazardous gas automatically. Many wireless sensor nodes were placed on an underground construction site and to collect hazardous gas level and environmental condition (temperature and humidity) data, and in any region where an abnormal status is detected, the BIM model will alert the region and an alarm and ventilator on site will start automatically for warning and removing the hazard. The proposed system can greatly enhance the efficiency in construction safety management and provide an important reference information in rescue tasks. Finally, a case study demonstrates the applicability of the proposed system and the practical benefits, limitations, conclusions, and suggestions are summarized for further applications.

  2. Space Transportation System Western Launch Site Construction Management Information System - A Case Study.

    DTIC Science & Technology

    1979-09-01

    The Corps of Engineers Management Information System (COEMIS) is used by the Corps of Engineers in their role as Construction Agents on Air Force...California. The research concluded that the Corps of Engineers Management Information System can be an effective, efficient management tool which has the

  3. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies

    PubMed Central

    Cheung, Weng-Fong; Lin, Tzu-Hsuan; Lin, Yu-Cheng

    2018-01-01

    In recent years, many studies have focused on the application of advanced technology as a way to improve management of construction safety management. A Wireless Sensor Network (WSN), one of the key technologies in Internet of Things (IoT) development, enables objects and devices to sense and communicate environmental conditions; Building Information Modeling (BIM), a revolutionary technology in construction, integrates database and geometry into a digital model which provides a visualized way in all construction lifecycle management. This paper integrates BIM and WSN into a unique system which enables the construction site to visually monitor the safety status via a spatial, colored interface and remove any hazardous gas automatically. Many wireless sensor nodes were placed on an underground construction site and to collect hazardous gas level and environmental condition (temperature and humidity) data, and in any region where an abnormal status is detected, the BIM model will alert the region and an alarm and ventilator on site will start automatically for warning and removing the hazard. The proposed system can greatly enhance the efficiency in construction safety management and provide an important reference information in rescue tasks. Finally, a case study demonstrates the applicability of the proposed system and the practical benefits, limitations, conclusions, and suggestions are summarized for further applications. PMID:29393887

  5. Effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County, northeast Kansas, February 2006 through November 2008

    USGS Publications Warehouse

    Lee, Casey J.; Ziegler, Andrew C.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the Johnson County, Kansas, Stormwater Management Program, investigated the effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County from February 2006 through November 2008. Streamgages and continuous turbidity sensors were operated at 15 sites within the urbanizing 57-square-mile Mill Creek Basin, and 4 sites downstream from the other largest basins (49 to 66 square miles) in Johnson County. The largest sediment yields in Johnson County were observed downstream from basins with increased construction activity. Sediment yields attributed to the largest (68 acre) active construction site in the study area were 9,300 tons per square mile in 2007 and 12,200 tons per square mile in 2008; 5 to 55 times larger than yields observed at other sampling sites. However, given erodible soils and steep slopes at this site, sediment yields were relatively small compared to the range in historic values from construction sites without erosion and sediment controls in the United States (2,300 to 140,000 tons per square mile). Downstream from this construction site, a sediment forebay and wetland were constructed in series upstream from Shawnee Mission Lake, a 120-acre reservoir within Shawnee Mission Park. Although the original intent of the sediment forebay and constructed wetland were unrelated to upstream construction, they were nonetheless evaluated in 2008 to characterize sediment removal before stream entry into the lake. The sediment forebay was estimated to reduce 33 percent of sediment transported to the lake, whereas the wetland did not appear to decrease downstream sediment transport. Comparisons of time-series data and relations between turbidity and sediment concentration indicate that larger silt-sized particles were deposited within the sediment forebay, whereas smaller silt and clay-sized sediments were transported through the wetland and into the lake. Data collected at sites up and downstream from the constructed wetland indicated that hydraulic retention alone did not substantially reduce sediment loading to Shawnee Mission Lake. Mean-daily turbidity values at sampling sites downstream from basins with increased construction activity were compared to U.S. Environmental Protection Agency turbidity criteria designed to reduce discharge of pollutants from construction sites. The U.S. Environmental Protection Agency numeric turbidity criteria specifies that effluent from construction sites greater than 20 acres not exceed a mean-daily turbidity value of 280 nephelometric turbidity units beginning in 2011; this criteria will apply to sites greater than 10 acres beginning in 2014. Although numeric criteria would not have been applicable to data from sampling sites in Johnson County because they were not directly downstream from construction sites and because individual states still have to determine additional details as to how this criteria will be enforced, comparisons were made to characterize the potential of construction site effluent in Johnson County to exceed U.S. Environmental Protection Agency Criteria, even under extensive erosion and sediment controls. Numeric criteria were exceeded at sampling sites downstream from basins with increased construction activity for multiple days during the study period, potentially indicating the need for additional erosion and sediment controls and (or) treatment to bring discharges from construction sites into compliance with future numeric turbidity criteria. Among sampling sites in the Mill Creek Basin, sediment yields from the urbanizing Clear Creek Basin were approximately 2 to 3 times those from older, more stable urban or rural basins. Sediments eroded from construction sites adjacent to or surrounding streams appear to be more readily transported downstream, whereas sediments eroded from construction sites in headwater areas are more likely to

  6. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction services are— (a) Site planning and landscape design; (b) Architectural and interior design; and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are design and... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  7. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  8. Applying Sensor-Based Technology to Improve Construction Safety Management.

    PubMed

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  9. Applying Sensor-Based Technology to Improve Construction Safety Management

    PubMed Central

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-01-01

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions. PMID:28800061

  10. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    USGS Publications Warehouse

    Sherfy, M.H.; Stucker, J.H.; Buhl, D.A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (na =a 798) and random points (na =a 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns. ?? 2011 The Wildlife Society.

  11. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    USGS Publications Warehouse

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  12. Research on Chinese Intelligent Guanglianda in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Romanovich, Marina; Shi, Peiyu; Wang, Ziyue; Zhao, Liang; Gerasimova, Vera

    2018-03-01

    Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.

  13. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  14. Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

    PubMed Central

    Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns. PMID:25114958

  15. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    PubMed

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  16. Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong.

    PubMed

    Hossain, Md Uzzal; Wu, Zezhou; Poon, Chi Sun

    2017-11-01

    This study aimed to compare the environmental performance of building construction waste management (CWM) systems in Hong Kong. Life cycle assessment (LCA) approach was applied to evaluate the performance of CWM systems holistically based on primary data collected from two real building construction sites and secondary data obtained from the literature. Different waste recovery rates were applied based on compositions and material flow to assess the influence on the environmental performance of CWM systems. The system boundary includes all stages of the life cycle of building construction waste (including transportation, sorting, public fill or landfill disposal, recovery and reuse, and transformation and valorization into secondary products). A substitutional LCA approach was applied for capturing the environmental gains due to the utilizations of recovered materials. The results showed that the CWM system by using off-site sorting and direct landfilling resulted in significant environmental impacts. However, a considerable net environmental benefit was observed through an on-site sorting system. For example, about 18-30kg CO 2 eq. greenhouse gases (GHGs) emission were induced for managing 1 t of construction waste through off-site sorting and direct landfilling, whereas significant GHGs emission could be potentially avoided (considered as a credit -126 to -182kg CO 2 eq.) for an on-site sorting system due to the higher recycling potential. Although the environmental benefits mainly depend on the waste compositions and their sortability, the analysis conducted in this study can serve as guidelines to design an effective and resource-efficient building CWM system. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    PubMed Central

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  18. Managing Construction Operations Visually: 3-D Techniques for Complex Topography and Restricted Visibility

    ERIC Educational Resources Information Center

    Rodriguez, Walter; Opdenbosh, Augusto; Santamaria, Juan Carlos

    2006-01-01

    Visual information is vital in planning and managing construction operations, particularly, where there is complex terrain topography and salvage operations with limited accessibility and visibility. From visually-assessing site operations and preventing equipment collisions to simulating material handling activities to supervising remotes sites…

  19. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    NASA Astrophysics Data System (ADS)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  20. Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research.

    PubMed

    Rowlinson, Steve; Yunyanjia, Andrea; Li, Baizhan; Chuanjingju, Carrie

    2014-05-01

    Climatic heat stress leads to accidents on construction sites brought about by a range of human factors emanating from heat induced illness, and fatigue leading to impaired capability, physical and mental. It is an occupational characteristic of construction work in many climates and the authors take the approach of re-engineering the whole safety management system rather than focusing on incremental improvement, which is current management practice in the construction industry. From a scientific viewpoint, climatic heat stress is determined by six key factors: (1) air temperature, (2) humidity, (3) radiant heat, and (4) wind speed indicating the environment, (5) metabolic heat generated by physical activities, and (6) "clothing effect" that moderates the heat exchange between the body and the environment. By making use of existing heat stress indices and heat stress management processes, heat stress risk on construction sites can be managed in three ways: (1) control of environmental heat stress exposure through use of an action-triggering threshold system, (2) control of continuous work time (CWT, referred by maximum allowable exposure duration) with mandatory work-rest regimens, and (3) enabling self-paced working through empowerment of employees. Existing heat stress practices and methodologies are critically reviewed and the authors propose a three-level methodology for an action-triggering, localized, simplified threshold system to facilitate effective decisions by frontline supervisors. The authors point out the need for "regional based" heat stress management practices that reflect unique climatic conditions, working practices and acclimatization propensity by local workers indifferent geographic regions. The authors set out the case for regional, rather than international, standards that account for this uniqueness and which are derived from site-based rather than laboratory-based research. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    PubMed Central

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite. PMID:25830069

  2. Integrating building information modeling and health and safety for onsite construction.

    PubMed

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  3. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    PubMed

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  4. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  5. AASHTOWare Preconstruction Preliminary Investigation

    DOT National Transportation Integrated Search

    2017-12-17

    The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...

  6. Forecasting of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Hf; Lafayette, Kalinny Pv

    2016-08-01

    The objective of this article is to develop a computerised tool (software) that facilitates the analysis of strategies for waste management on construction sites through the use of indicators of construction and demolition waste generation. The development involved the following steps: knowledge acquisition, structuring the system, coding and system evaluation. The step of knowledge acquisition aims to provide subsidies for the representation of them through models. In the step of structuring the system, it was presented the structuring and formalisation of knowledge for the development of the system, and has two stages: the construction of the conceptual model and the subsequent instantiation of the model. The coding system aims to implement (code) the conceptual model developed in a model played by computer (digital). The results showed that the system is very useful and applicable in construction sites, helping to improve the quality of waste management, and creating a database that will support new research. © The Author(s) 2016.

  7. Welcome to the Neighborhood.

    ERIC Educational Resources Information Center

    Schneider, Jay W.

    2001-01-01

    Discusses how community interest and involvement helps a new school reinvigorate an urban area. Community input into design and site selection, site improvements, interior elements, and construction management are addressed. (GR)

  8. Lessons Learned.

    ERIC Educational Resources Information Center

    Hassell, Kim Dale

    2000-01-01

    Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)

  9. The concept of value stream mapping to reduce of work-time waste as applied the smart construction management

    NASA Astrophysics Data System (ADS)

    Elizar, Suripin, Wibowo, Mochamad Agung

    2017-11-01

    Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.

  10. Worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry

    NASA Astrophysics Data System (ADS)

    Hafiidz, J. Mohd; Arifin, K.; Aiyub, K.; Razman, M. R.; Samsurijan, M. S.; Syakir, M. I.

    2017-09-01

    Construction industry is an important sector that contributes to the development of economy and socioeconomy in Malaysia. It is a vital component in achieving the developed country status. However, fatalities in the Malaysian construction industry are a critical problem. Number of fatalities in this industry is the highest compared to other industries registered in Malaysia under the investigation of Department of Occupational Safety and Health (DOSH). Worksite element (worksite conditions, poor site management, construction tasks, and equipment & materials) was identified as one category of causes of occupational accidents and illnesses in Malaysian construction industry. The main objective of this study is to understand the perception of local construction personnel in terms of worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry. 13 housing projects that were registered with Ministry of Urban Wellbeing, Housing and Local Government and being permitted to perform construction work in 2012 were selected in Pulau Pinang to be studied using questionnaire survey. Worksite condition and poor site management was perceived as the most significant with the mean values of 3.68 and 3.61 respectively.

  11. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  12. Climatic and psychosocial risks of heat illness incidents on construction site.

    PubMed

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  13. A before-after control-impact assessment to understand the potential impacts of highway construction noise and activity on an endangered songbird.

    PubMed

    Long, Ashley M; Colón, Melanie R; Bosman, Jessica L; Robinson, Dianne H; Pruett, Hannah L; McFarland, Tiffany M; Mathewson, Heather A; Szewczak, Joseph M; Newnam, J Cal; Morrison, Michael L

    2017-01-01

    Anthropogenic noise associated with highway construction and operation can have individual- and population-level consequences for wildlife (e.g., reduced densities, decreased reproductive success, behavioral changes). We used a before-after control-impact study design to examine the potential impacts of highway construction and traffic noise on endangered golden-cheeked warblers ( Setophaga chrysoparia ; hereafter warbler) in urban Texas. We mapped and monitored warbler territories before (2009-2011), during (2012-2013), and after (2014) highway construction at three study sites: a treatment site exposed to highway construction and traffic noise, a control site exposed only to traffic noise, and a second control site exposed to neither highway construction or traffic noise. We measured noise levels at varying distances from the highway at sites exposed to construction and traffic noise. We examined how highway construction and traffic noise influenced warbler territory density, territory placement, productivity, and song characteristics. In addition, we conducted a playback experiment within study sites to evaluate acute behavioral responses to highway construction noises. Noise decreased with increasing distance from the highways. However, noise did not differ between the construction and traffic noise sites or across time. Warbler territory density increased over time at all study sites, and we found no differences in warbler territory placement, productivity, behavior, or song characteristics that we can attribute to highway construction or traffic noise. As such, we found no evidence to suggest that highway construction or traffic noise had a negative effect on warblers during our study. Because human population growth will require recurring improvements to transportation infrastructure, understanding wildlife responses to anthropogenic noise associated with the construction and operation of roads is essential for effective management and recovery of prioritized species.

  14. Occupational safety and health management in the construction industry: a review.

    PubMed

    Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin

    2017-09-11

    The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.

  15. Analysis of Material Handling Safety in Construction Sites and Countermeasures for Effective Enhancement

    PubMed Central

    Anil Kumar, C. N.; Sakthivel, M.; Elangovan, R. K.; Arularasu, M.

    2015-01-01

    One of many hazardous workplaces includes the construction sites as they involve several dangerous tasks. Many studies have revealed that material handling equipment is a major cause of accidents at these sites. Though safety measures are being followed and monitored continuously, accident rates are still high as either workers are unaware of hazards or the safety regulations are not being strictly followed. This paper analyses the safety management systems at construction sites through means of questionnaire surveys with employees, specifically referring to safety of material handling equipment. Based on results of the questionnaire surveys, two construction sites were selected for a safety education program targeting worker safety related to material handling equipment. Knowledge levels of the workers were gathered before and after the program and results obtained were subjected to a t-test analysis to mark significance level of the conducted safety education program. PMID:26446572

  16. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  17. Participatory Training to Improve Safety and Health in Small Construction Sites in Some Countries in Asia: Development and Application of the WISCON Training Program.

    PubMed

    Kawakami, Tsuyoshi

    2016-08-01

    A participatory training program, Work Improvement in Small Construction Sites, was developed to provide practical support measures to the small construction sector. Managers and workers from selected small sites were interviewed about their occupational safety and health risks. The Work Improvement in Small Construction Sites training program comprised a 45-item action checklist, photos, and illustrations showing local examples and group work methods. Pilot training workshops were carried out with workers and employers in Cambodia, Laos, Mongolia, Thailand, and Vietnam. Participants subsequently planned, and using locally available low-cost materials, implemented their own improvements such as hand-made hand trucks to carry heavy materials, removal of projecting nails from timber materials, and fences to protect roof workers from falling. Local Work Improvement in Small Construction Sites trainers consisting of government officials, workers, employers, and nongovernment organization representatives were then trained to implement the Work Improvement in Small Construction Sites training widely. Keys to success were easy-to-apply training tools aiming at immediate, low-cost improvements, and collaboration with various local people's networks. © The Author(s) 2016.

  18. A Principal's Guide to On-Site School Construction

    ERIC Educational Resources Information Center

    Brenner, William A.

    2009-01-01

    This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…

  19. Effects of organizational complexity and resources on construction site risk.

    PubMed

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  20. Comparisons of mosquito populations before and after construction of a wetland for water quality improvement in Pitt County, North Carolina, and data-reliant vectorborne disease management.

    PubMed

    Anderson, Alice L; O'Brien, Kevin; Hartwell, Megan

    2007-04-01

    Wetlands serve an important purpose in flood control and water quality, but constructed-wetland sites also provide habitats for mosquito breeding. Communities near constructed-wetland sites often raise a "mosquito" objection when constructed wetlands are proposed. Wildlife and wetland advocates can confuse the public by making unsubstantiated claims about natural predators eliminating or controlling mosquito problems in a constructed wetland. Management of constructed-wetland mosquito habitat, with adequate mosquito surveillance and data analysis, can help lead to a successful project and satisfied citizens. The cooperative project described in this paper, was conducted in the town of Simpson, North Carolina, and was designed to determine the mosquito population impact of wetland construction at Mill Branch Stream, a small tributary of the Tar River in Eastern North Carolina. In the authors' analysis of three years of mosquito surveillance data, month (time of year standing in for temperature and day length) was a significant factor in regression analysis for mosquito numbers, but rainfall was not. Numbers of mosquitoes were not found to be significantly higher after construction than before construction.

  1. 77 FR 52060 - Notice of Lodging of Consent Decree Pursuant to the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... through best management practices, (c) capacity, management, operation and maintenance corrective action, (d) construction site inspection and enforcement, and (e) industrial facility stormwater pollution...

  2. On the prevailing construction waste recycling practices: a South East Queensland study.

    PubMed

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  3. Studies on Labour Safety in Construction Sites

    PubMed Central

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  4. Studies on Labour Safety in Construction Sites.

    PubMed

    Kanchana, S; Sivaprakash, P; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  5. Quality Improvement of Ground Works Process with the Use of Chosen Lean Management Tools - Case Study

    NASA Astrophysics Data System (ADS)

    Nowotarski, Piotr; Paslawski, Jerzy; Wysocki, Bartosz

    2017-12-01

    Ground works are one of the first processes connected with erecting structures. Based on ground conditions like the type of soil or level of underground water different types and solutions for foundations are designed. Foundations are the base for the buildings, and their proper design and execution is the key for the long and faultless use of the whole construction and might influence on the future costs of the eventual repairs (especially when ground water level is high, and there is no proper water insulation made). Article presents the introduction of chosen Lean Management tools for quality improvement of the process of ground works based on the analysis made on the construction site of vehicle control station located in Poznan, Poland. Processes assessment is made from different perspectives taking into account that 3 main groups of workers were directly involved in the process: blue collar-workers, site manager and site engineers. What is more comparison is made on the 3 points of view to the problems that might occur during this type of works, with details analysis on the causes of such situation? Authors presents also the change of approach of workers directly involved in the mentioned processes regarding introduction of Lean Management methodology, which illustrates the problem of scepticism for new ideas of the people used to perform works and actions in traditional way. Using Lean Management philosophy in construction is a good idea to streamline processes in company, get rid of constantly recurring problems, and in this way improve the productivity and quality of executed activities. Performed analysis showed that different groups of people have very different idea and opinion on the problems connected with executing the same process - ground works and only having full picture of the situation (especially in construction processes) management can take proper problems-preventing actions that consequently can influence on the amount of waste generated on the construction cite which positively influence on the external environment.

  6. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  7. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-11-01

    Construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site (SRS) began during FY-1984. The Savannah River Ecology Laboratory (SREL) has completed 15 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Through the long-term census taking of biota at the DWPF site and Rainbow Bay, SREL has been evaluating the impact of construction on the biota and the effectiveness of mitigation efforts. similarly, the effects of erosion from the DWPF site on the water quality ofmore » S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).« less

  8. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    PubMed

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. 15 CFR 921.80 - Application information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... awards for preacquisition, acquisition and development, operation and management, and special education...-site selection, operation and management, research, and education and interpretive awards. The... projects, or restorative activities involving construction, must include a preliminary engineering report...

  10. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  11. CSHM: Web-based safety and health monitoring system for construction management.

    PubMed

    Cheung, Sai On; Cheung, Kevin K W; Suen, Henry C H

    2004-01-01

    This paper describes a web-based system for monitoring and assessing construction safety and health performance, entitled the Construction Safety and Health Monitoring (CSHM) system. The design and development of CSHM is an integration of internet and database systems, with the intent to create a total automated safety and health management tool. A list of safety and health performance parameters was devised for the management of safety and health in construction. A conceptual framework of the four key components of CSHM is presented: (a) Web-based Interface (templates); (b) Knowledge Base; (c) Output Data; and (d) Benchmark Group. The combined effect of these components results in a system that enables speedy performance assessment of safety and health activities on construction sites. With the CSHM's built-in functions, important management decisions can theoretically be made and corrective actions can be taken before potential hazards turn into fatal or injurious occupational accidents. As such, the CSHM system will accelerate the monitoring and assessing of performance safety and health management tasks.

  12. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  13. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  14. Application of the predicted heat strain model in development of localized, threshold-based heat stress management guidelines for the construction industry.

    PubMed

    Rowlinson, Steve; Jia, Yunyan Andrea

    2014-04-01

    Existing heat stress risk management guidelines recommended by international standards are not practical for the construction industry which needs site supervision staff to make instant managerial decisions to mitigate heat risks. The ability of the predicted heat strain (PHS) model [ISO 7933 (2004). Ergonomics of the thermal environment analytical determination and interpretation of heat stress using calculation of the predicted heat strain. Geneva: International Standard Organisation] to predict maximum allowable exposure time (D lim) has now enabled development of localized, action-triggering and threshold-based guidelines for implementation by lay frontline staff on construction sites. This article presents a protocol for development of two heat stress management tools by applying the PHS model to its full potential. One of the tools is developed to facilitate managerial decisions on an optimized work-rest regimen for paced work. The other tool is developed to enable workers' self-regulation during self-paced work.

  15. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPFmore » site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).« less

  16. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What sustainable...? 102-76.55 Section 102-76.55 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design...

  17. The Construct of State-Level Suspicion A Model and Research Agenda for Automated and Information Technology (IT) Contexts

    DTIC Science & Technology

    2013-08-01

    Explaining and Predicting the Impact of Branding Alliances and Web Site Quality ...on Initial Consumer Trust of e - Commerce Web Sites . Journal of Management Information Systems, 24, 199-224. Lyons, J., Stokes, C., Eschleman, K...Organizations. Academy of Management Journal, 38, 24-59. McKnight, D., Choudhury, V., & Kacmar, C. (2002). The Impact of Initial Consumer Trust

  18. Phase 1 Environmental Baseline Survey for Construction of a Solar Photovoltaic System by NV Energy on Nellis Air Force Base, Clark County, Nevada

    DTIC Science & Technology

    2011-01-01

    is managed by the Restoration Program Manager (RPM) of the 99 CES/CEVR. Category 4 – Remedial action required and taken. Property where...Restoration Program Manager Mr. Waldo Pulido was contacted at his office, and he stated that he was not aware of any hazardous materials storage or...Site LF-01 and Site ST-27. Mr. Henry Rodriguez, 99 CES/CEANQ, Toxics Program Manager Mr. Henry Rodriguez was contacted at his office in 2009 as

  19. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  20. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  1. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  2. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  3. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China.

    PubMed

    Lu, Weisheng; Yuan, Hongping; Li, Jingru; Hao, Jane J L; Mi, Xuming; Ding, Zhikun

    2011-04-01

    The construction and demolition waste generation rates (C&D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m(2) and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C&D waste management in China. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. The transferability of safety-driven access management models for application to other sites.

    DOT National Transportation Integrated Search

    2001-01-01

    Several research studies have produced mathematical models that predict the safety impacts of selected access management techniques. Since new models require substantial resources to construct, this study evaluated five existing models with regard to...

  5. UTILITY DATA ARCHIVING FOR RISK MANAGEMENT

    EPA Science Inventory

    EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...

  6. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  7. Visitor evaluations of management actions at a highly impacted Appalachian Trail camping area.

    PubMed

    Daniels, Melissa L; Marion, Jeffrey L

    2006-12-01

    Protected area management involves balancing environmental and social objectives. This is particularly difficult at high-use/high-impact recreation sites, because resource protection objectives may require substantial site management or visitor regulation. This study examined visitors' reactions to both of these types of actions at Annapolis Rocks, Maryland, a popular Appalachian Trail camping area. We surveyed visitors before and after implementation of camping policies that included shifting camping to designated newly constructed campsites and prohibiting campfires. Survey results reveal that visitors were more satisfied with all social and environmental indicators after the changes were enacted. An Importance-Performance analysis also determined that management actions improved conditions for factors of greatest concern to campers prior to the changes. Posttreatment visitors were least satisfied with factors related to reduced freedom and to some characteristics of the constructed campsites. Although there was evidence of visitor displacement, the camping changes met management goals by protecting the camping area's natural resources and improving social conditions.

  8. Visitor evaluations of management actions at a highly impacted Appalachian Trail camping area

    USGS Publications Warehouse

    Daniels, M.L.; Marion, J.L.

    2006-01-01

    Protected area management involves balancing environmental and social objectives. This is particularly difficult at high-use/high-impact recreation sites, because resource protection objectives may require substantial site management or visitor regulation. This study examined visitors? reactions to both of these types of actions at Annapolis Rocks, Maryland, a popular Appalachian Trail camping area. We surveyed visitors before and after implementation of camping policies that included shifting camping to designated newly constructed campsites and prohibiting campfires. Survey results reveal that visitors were more satisfied with all social and environmental indicators after the changes were enacted. An Importance-Performance analysis also determined that management actions improved conditions for factors of greatest concern to campers prior to the changes. Posttreatment visitors were least satisfied with factors related to reduced freedom and to some characteristics of the constructed campsites. Although there was evidence of visitor displacement, the camping changes met management goals by protecting the camping area?s natural resources and improving social conditions.

  9. Visitor Evaluations of Management Actions at a Highly Impacted Appalachian Trail Camping Area

    NASA Astrophysics Data System (ADS)

    Daniels, Melissa L.; Marion, Jeffrey L.

    2006-12-01

    Protected area management involves balancing environmental and social objectives. This is particularly difficult at high-use/high-impact recreation sites, because resource protection objectives may require substantial site management or visitor regulation. This study examined visitors’ reactions to both of these types of actions at Annapolis Rocks, Maryland, a popular Appalachian Trail camping area. We surveyed visitors before and after implementation of camping policies that included shifting camping to designated newly constructed campsites and prohibiting campfires. Survey results reveal that visitors were more satisfied with all social and environmental indicators after the changes were enacted. An Importance-Performance analysis also determined that management actions improved conditions for factors of greatest concern to campers prior to the changes. Posttreatment visitors were least satisfied with factors related to reduced freedom and to some characteristics of the constructed campsites. Although there was evidence of visitor displacement, the camping changes met management goals by protecting the camping area’s natural resources and improving social conditions.

  10. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  11. Management practices that concentrate visitor activities: Camping impact management at Isle Royale National Park, USA

    USGS Publications Warehouse

    Marion, J.L.; Farrell, T.A.

    2002-01-01

    This study assessed campsite conditions and the effectiveness of campsite impact management strategies at Isle Royale National Park, USA. Protocols for assessing indicators of vegetation and soil conditions were developed and applied to 156 campsites and 88 shelters within 36 backcountry campgrounds. The average site was 68 m2 and 83% of sites lost vegetation over areas less than 47 m2. Results reveal that management actions to spatially concentrate camping activities and reduce camping disturbance have been highly successful. Comparisons of disturbed area/overnight stay among other protected areas reinforces this assertion. These reductions in area of camping disturbance are attributed to a designated site camping policy, limitation on site numbers, construction of sites in sloping terrain, use of facilities, and an ongoing program of campsite maintenance. Such actions are most appropriate in higher use backcountry and wilderness settings.

  12. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  13. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  14. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  15. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  16. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  17. FREE-WATER DEPTH AS A MANAGEMENT TOOL FOR CONSTRUCTED WETLANDS

    EPA Science Inventory

    Marsh plants in constructed wetlands have shown the capacity to remove unwanted pollutants from storm water runoff. The plants can be established at the site from bare roots. However, plant growth from bare roots can be restricted by the elevated water depths. Using several wa...

  18. Mechanisation and automation technologies development in work at construction sites

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  19. Contributing factors in construction accidents.

    PubMed

    Haslam, R A; Hide, S A; Gibb, A G F; Gyi, D E; Pavitt, T; Atkinson, S; Duff, A R

    2005-07-01

    This overview paper draws together findings from previous focus group research and studies of 100 individual construction accidents. Pursuing issues raised by the focus groups, the accident studies collected qualitative information on the circumstances of each incident and the causal influences involved. Site based data collection entailed interviews with accident-involved personnel and their supervisor or manager, inspection of the accident location, and review of appropriate documentation. Relevant issues from the site investigations were then followed up with off-site stakeholders, including designers, manufacturers and suppliers. Levels of involvement of key factors in the accidents were: problems arising from workers or the work team (70% of accidents), workplace issues (49%), shortcomings with equipment (including PPE) (56%), problems with suitability and condition of materials (27%), and deficiencies with risk management (84%). Employing an ergonomics systems approach, a model is proposed, indicating the manner in which originating managerial, design and cultural factors shape the circumstances found in the work place, giving rise to the acts and conditions which, in turn, lead to accidents. It is argued that attention to the originating influences will be necessary for sustained improvement in construction safety to be achieved.

  20. Robust Classification and Segmentation of Planar and Linear Features for Construction Site Progress Monitoring and Structural Dimension Compliance Control

    NASA Astrophysics Data System (ADS)

    Maalek, R.; Lichti, D. D.; Ruwanpura, J.

    2015-08-01

    The application of terrestrial laser scanners (TLSs) on construction sites for automating construction progress monitoring and controlling structural dimension compliance is growing markedly. However, current research in construction management relies on the planned building information model (BIM) to assign the accumulated point clouds to their corresponding structural elements, which may not be reliable in cases where the dimensions of the as-built structure differ from those of the planned model and/or the planned model is not available with sufficient detail. In addition outliers exist in construction site datasets due to data artefacts caused by moving objects, occlusions and dust. In order to overcome the aforementioned limitations, a novel method for robust classification and segmentation of planar and linear features is proposed to reduce the effects of outliers present in the LiDAR data collected from construction sites. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a robust clustering method. A method is also proposed to robustly extract the points belonging to the flat-slab floors and/or ceilings without performing the aforementioned stages in order to preserve computational efficiency. The applicability of the proposed method is investigated in two scenarios, namely, a laboratory with 30 million points and an actual construction site with over 150 million points. The results obtained by the two experiments validate the suitability of the proposed method for robust segmentation of planar and linear features in contaminated datasets, such as those collected from construction sites.

  1. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    NASA Astrophysics Data System (ADS)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  2. Construction alternatives for free-standing facilities.

    PubMed

    Brown, G

    1990-01-01

    Many hospitals are exploring free-standing facilities as an option for providing more efficient imaging services. Mr. Brown discusses the pros and cons of an emerging building technology, manufactured construction, in which building and site preparation are done simultaneously. He presents the criteria managers should use to make a knowledgeable decision.

  3. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  4. Peacetime Innovation and the U.S. Army Corps of Engineers: Managing Technology for Industrial Application

    DTIC Science & Technology

    1993-02-04

    be done by using the corps’ organic construction management assets at contaminated military sites in a test bed or incubator fashion to hedge high ...wastes at military sites is introduced to highlight its efficacy in developing high risk, high payoff remediation techrhologies. A number of...investment. Exposure to potential litigation makes such ventures nearly impossible. Small contractors attempting to penetrate the market with innovative

  5. Analysis of factors influencing safety management for metro construction in China.

    PubMed

    Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B

    2014-07-01

    With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  7. Canadian Innovations in Siting Hazardous Waste Management Facilities

    PubMed

    Kuhn; Ballard

    1998-07-01

    / Siting hazardous waste facilities is an extremely complex and difficult endeavor. Public aversion to the construction of these facilities in or near their community often results in concerted opposition, referred to as the NIMBY syndrome. For the most part, siting processes do not fail because of inadequate environmental or technical considerations, but because of the adversarial decision-making strategies employed by the proponents. Innovative siting processes used in the provinces of Alberta and Manitoba offer tangible evidence of the successful application of an innovative siting approach based on the principles of decentralization of decision-making authority and full and meaningful public involvement. The purpose of this paper is to evaluate four Canadian siting processes from the perspective of public participation and access to decision-making authority. Examples of siting processes related to hazardous waste management facilities are provided from the provinces of Alberta, Manitoba, British Columbia, and Ontario. Siting has evolved from approaches dominated by top-down decision making to increasing decentralized and pluralistic approaches. Focusing on social and political concerns of potentially affected communities and on the process of decision making itself are fundamental to achieving siting success. In Alberta initially, and later in Manitoba, this new "open approach" to siting has resulted in the construction of the first two comprehensive hazardous waste treatment facilities in Canada.KEY WORDS: Hazardous waste facilities; Siting methodologies; Public participation

  8. Preparation for the Recovery of Spent Nuclear Fuel (SNF) at Andreeva Bay, North West Russia - 13309

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, D.; McAtamney, N.

    Andreeva Bay is located near Murmansk in the Russian Federation close to the Norwegian border. The ex-naval site was used to de-fuel nuclear-powered submarines and icebreakers during the Cold War. Approximately 22,000 fuel assemblies remain in three Dry Storage Units (DSUs) which means that Andreeva Bay has one of the largest stockpiles of highly enriched spent nuclear fuel (SNF) in the world. The high contamination and deteriorating condition of the SNF canisters has made improvements to the management of the SNF a high priority for the international community for safety, security and environmental reasons. International Donors have, since 2002, providedmore » support to projects at Andreeva concerned with improving the management of the SNF. This long-term programme of work has been coordinated between the International Donors and responsible bodies within the Russian Federation. Options for the safe and secure management of SNF at Andreeva Bay were considered in 2004 and developed by a number of Russian Institutes with international participation. This consisted of site investigations, surveys and studies to understand the technical challenges. A principal agreement was reached that the SNF would be removed from the site altogether and transported to Russia's reprocessing facility at Mayak in the Urals. The analytical studies provided the information necessary to develop the construction plan for the site. Following design and regulatory processes, stakeholders endorsed the technical solution in April 2007. This detailed the processes, facilities and equipment required to safely remove the SNF and identified other site services and support facilities required on the site. Implementation of this strategy is now well underway with the facilities in various states of construction. Physical works have been performed to address the most urgent tasks including weather protection over one of the DSUs, installation of shielding over the cells, provision of radiation protection infrastructure and general preparation of the site for construction of the facilities for the removal of the SNF. This paper describes the development and implementation of the strategy and work to improve the safe and secure management of SNF, preparing it for retrieval and removal from Andreeva Bay. (authors)« less

  9. A retrospective tiered environmental assessment of the Mount Storm Wind Energy Facility, West Virginia,USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Efroymson, Rebecca Ann; Day, Robin; Strickland, M. Dale

    Bird and bat fatalities from wind energy projects are an environmental and public concern, with post-construction fatalities sometimes differing from predictions. Siting facilities in this context can be a challenge. In March 2012 the U.S. Fish and Wildlife Service (USFWS) released Land-based Wind Energy Guidelines to assess collision fatalities and other potential impacts to species of concern and their habitats to aid in siting and management. The Guidelines recommend a tiered approach for assessing risk to wildlife, including a preliminary site evaluation that may evaluate alternative sites, a site characterization, field studies to document wildlife and habitat and to predictmore » project impacts, post construction studies to estimate impacts, and other post construction studies. We applied the tiered assessment framework to a case study site, the Mount Storm Wind Energy Facility in Grant County, West Virginia, USA, to demonstrate the use of the USFWS assessment approach, to indicate how the use of a tiered assessment framework might have altered outputs of wildlife assessments previously undertaken for the case study site, and to assess benefits of a tiered ecological assessment framework for siting wind energy facilities. The conclusions of this tiered assessment for birds are similar to those of previous environmental assessments for Mount Storm. This assessment found risk to individual migratory tree-roosting bats that was not emphasized in previous preconstruction assessments. Differences compared to previous environmental assessments are more related to knowledge accrued in the past 10 years rather than to the tiered structure of the Guidelines. Benefits of the tiered assessment framework include good communication among stakeholders, clear decision points, a standard assessment trajectory, narrowing the list of species of concern, improving study protocols, promoting consideration of population-level effects, promoting adaptive management through post-construction assessment and mitigation, and sharing information that can be used in other assessments.« less

  10. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    PubMed

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  11. UAS Integration in the NAS Project Test Site Kick-off Meeting

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  12. Analysis of noise on construction sites of high-rise buildings.

    PubMed

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  13. Utilization of building information modeling in infrastructure’s design and construction

    NASA Astrophysics Data System (ADS)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  14. Auditing of suppliers as the requirement of quality management systems in construction

    NASA Astrophysics Data System (ADS)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  15. 1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.

    DTIC Science & Technology

    1981-02-02

    7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of

  16. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  17. Public health assessment for waste management of Wisconsin-Brookfield, Brookfield, Waukesha County, Wisconsin, Region 5. Cerclis No. WID980901235. Preliminary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-14

    The Waste Management-Brookfield Landfill was a former gravel pit used to dispose of municipal, commercial, and industrial wastes. Methane gas migration has been a problem at the site in the past. A gas extraction system was installed within the landfill. Gas probes that measure total combustible gas have also been installed on site. Continuous methane/combustible gas monitors were placed in two residential basements; relatively high levels of gas were measured in one residence in 1985. Groundwater beneath the site has been contaminated from the site. The landfill does not have a liner. Waste Management has constructed a new clay capmore » that is well vegetated and maintained regularly. The site poses an indeterminate public health hazard from inhalation exposure to contaminated indoor air migrating into the basements of nearby residences.« less

  18. Production patterns of packaging waste categories generated at typical Mediterranean residential building worksites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    González Pericot, N., E-mail: natalia.gpericot@upm.es; Villoria Sáez, P., E-mail: paola.villoria@upm.es; Del Río Merino, M., E-mail: mercedes.delrio@upm.es

    2014-11-15

    Highlights: • On-site segregation level: 1.80%; training and motivation strategies were not effective. • 70% Cardboard waste: from switches and sockets during the building services stage. • 40% Plastic waste: generated during structures and partition works due to palletizing. • >50% Wood packaging waste, basically pallets, generated during the envelope works. - Abstract: The construction sector is responsible for around 28% of the total waste volume generated in Europe, which exceeds the amount of household waste. This has led to an increase of different research studies focusing on construction waste quantification. However, within the research studies made, packaging waste hasmore » been analyzed to a limited extent. This article focuses on the packaging waste stream generated in the construction sector. To this purpose current on-site waste packaging management has been assessed by monitoring ten Mediterranean residential building works. The findings of the experimental data collection revealed that the incentive measures implemented by the construction company to improve on-site waste sorting failed to achieve the intended purpose, showing low segregation ratios. Subsequently, through an analytical study the generation patterns for packaging waste are established, leading to the identification of the prevailing kinds of packaging and the products responsible for their generation. Results indicate that plastic waste generation maintains a constant trend throughout the whole construction process, while cardboard becomes predominant towards the end of the construction works with switches and sockets from the electricity stage. Understanding the production patterns of packaging waste will be beneficial for adapting waste management strategies to the identified patterns for the specific nature of packaging waste within the context of construction worksites.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less

  1. Production patterns of packaging waste categories generated at typical Mediterranean residential building worksites.

    PubMed

    González Pericot, N; Villoria Sáez, P; Del Río Merino, M; Liébana Carrasco, O

    2014-11-01

    The construction sector is responsible for around 28% of the total waste volume generated in Europe, which exceeds the amount of household waste. This has led to an increase of different research studies focusing on construction waste quantification. However, within the research studies made, packaging waste has been analyzed to a limited extent. This article focuses on the packaging waste stream generated in the construction sector. To this purpose current on-site waste packaging management has been assessed by monitoring ten Mediterranean residential building works. The findings of the experimental data collection revealed that the incentive measures implemented by the construction company to improve on-site waste sorting failed to achieve the intended purpose, showing low segregation ratios. Subsequently, through an analytical study the generation patterns for packaging waste are established, leading to the identification of the prevailing kinds of packaging and the products responsible for their generation. Results indicate that plastic waste generation maintains a constant trend throughout the whole construction process, while cardboard becomes predominant towards the end of the construction works with switches and sockets from the electricity stage. Understanding the production patterns of packaging waste will be beneficial for adapting waste management strategies to the identified patterns for the specific nature of packaging waste within the context of construction worksites. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  3. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  4. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  5. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  6. An investigation and analysis of safety issues in Polish small construction plants.

    PubMed

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.

  7. An investigation and analysis of safety issues in Polish small construction plants

    PubMed Central

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety. PMID:26694002

  8. Environmental impact of preservative-treated wood in a wetland boardwalk.

    Treesearch

    Stan T. Lebow; Patricia K. Lebow; Daniel O. Foster; Kenneth M. Brooks

    Forest Service, Bureau of Land Management, and industry partners are cooperating in a study of the leaching and environmental effects of a wetland boardwalk. The construction project is considered bworst casec because the site has high rainfall and large volumes of treated wood were used. Separate boardwalk test sections were constructed using untreated wood or wood...

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  10. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  12. Management and techniques for riparian restorations: roads field guide, vol. I

    Treesearch

    Roads/Riparian Restoration Team

    2002-01-01

    Improperly constructed or maintained roads near riparian and wetland areas may degrade these valuable sites. Degradation affects many aspects of the riparian and wetland ecosystems. This field guide presents information in a practical, user friendly format to help resource managers and professionals. Well-documented evaluation and monitoring strategies are critical in...

  13. Management and techniques for riparian restorations: roads field guide, vol. II

    Treesearch

    Roads/Riparian Restoration Team

    2002-01-01

    Improperly constructed or maintained roads near riparian and wetland areas may degrade these valuable sites. Degradation affects many aspects of the riparian and wetland ecosystems. This field guide presents information in a practical, user friendly format to help resource managers and professionals. Well-documented evaluation and monitoring strategies are critical in...

  14. Virginia Agency Agrees to Stormwater Controls

    EPA Pesticide Factsheets

    In agreements with EPA, the Virginia Department of Transportation (VDOT) has made a state- and agency-wide commitment to improve stormwater pollution controls and practices for roads, facilities and construction sites it manages.

  15. On the Rapid Rise of Social Networking Sites: New Findings and Policy Implications

    ERIC Educational Resources Information Center

    Livingstone, Sonia; Brake, David R

    2010-01-01

    Social networking sites have been rapidly adopted by children and, especially, teenagers and young people worldwide, enabling new opportunities for the presentation of the self, learning, construction of a wide circle of relationships, and the management of privacy and intimacy. On the other hand, there are also concerns that social networking…

  16. Architects' perspectives on construction waste reduction by design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-07-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previousmore » studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.« less

  17. Architects' perspectives on construction waste reduction by design.

    PubMed

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  18. Appropriate technology for domestic wastewater management in under-resourced regions of the world

    NASA Astrophysics Data System (ADS)

    Oladoja, Nurudeen Abiola

    2017-11-01

    Centralized wastewater management system is the modern day waste management practice, but the high cost and stringent requirements for the construction and operation have made it less attractive in the under-resourced regions of the world. Considering these challenges, the use of decentralized wastewater management system, on-site treatment system, as an appropriate technology for domestic wastewater treatment is hereby advocated. Adopting this technology helps save money, protects home owners' investment, promotes better watershed management, offers an appropriate solution for low-density communities, provides suitable alternatives for varying site conditions and furnishes effective solutions for ecologically sensitive areas. In the light of this, an overview of the on-site treatment scheme, at the laboratory scale, pilot study stage, and field trials was conducted to highlight the operational principles' strength and shortcomings of the scheme. The operational requirements for the establishing and operation of the scheme and best management practice to enhance the performance and sustenance were proffered.

  19. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  20. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  1. OCONUS Compliance Assessment Protocols Air Force Supplement

    DTIC Science & Technology

    2009-09-01

    that have environmental impacts (i.e., construction, mission changes, process/activity changes). Are environmental surveys and construction site...how and where does disposal occur? Has the installation conducted a complete asbestos survey ? If yes, what the date of the most recent... survey ? (Please provide a copy for the assessment team.) Has the installation prepared, coordinated, and executed an Asbestos Management Plan

  2. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  3. Landscape scale ecological monitoring as part of an EIA of major construction activities: experience at the Turkish section of the BTC crude oil pipeline project.

    PubMed

    Sahin, Sükran; Kurum, Ekrem

    2009-09-01

    Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.

  4. The use of dynamic modeling in assessing tritium phytoremediation

    Treesearch

    Karin T. Rebel; Susan J. Riha; John C. Seaman; Clinton d. Barton

    2005-01-01

    To minimize movement of tritium into surface waters at the Mixed Waste Management Facility at the Savannah River Site, tritiumcontaminated groundwater released to the surface along seeps in the hillside is being retained in a constructed pond and used to irrigate forest acreage that lies over the contaminated groundwater. Management of the application of tritium-...

  5. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    PubMed

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. Mojo Hand, a TALEN design tool for genome editing applications.

    PubMed

    Neff, Kevin L; Argue, David P; Ma, Alvin C; Lee, Han B; Clark, Karl J; Ekker, Stephen C

    2013-01-16

    Recent studies of transcription activator-like (TAL) effector domains fused to nucleases (TALENs) demonstrate enormous potential for genome editing. Effective design of TALENs requires a combination of selecting appropriate genetic features, finding pairs of binding sites based on a consensus sequence, and, in some cases, identifying endogenous restriction sites for downstream molecular genetic applications. We present the web-based program Mojo Hand for designing TAL and TALEN constructs for genome editing applications (http://www.talendesign.org). We describe the algorithm and its implementation. The features of Mojo Hand include (1) automatic download of genomic data from the National Center for Biotechnology Information, (2) analysis of any DNA sequence to reveal pairs of binding sites based on a user-defined template, (3) selection of restriction-enzyme recognition sites in the spacer between the TAL monomer binding sites including options for the selection of restriction enzyme suppliers, and (4) output files designed for subsequent TALEN construction using the Golden Gate assembly method. Mojo Hand enables the rapid identification of TAL binding sites for use in TALEN design. The assembly of TALEN constructs, is also simplified by using the TAL-site prediction program in conjunction with a spreadsheet management aid of reagent concentrations and TALEN formulation. Mojo Hand enables scientists to more rapidly deploy TALENs for genome editing applications.

  7. 75 FR 36438 - Notice of Interim Final Supplementary Rules for Public Lands Managed by the California Desert...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... purposes. Such sites or areas may include such features as: Delineated spaces for parking, camping or boat.../or construction debris. 4. Possession of glass beverage containers is prohibited in all developed... or save a camping space for another person at all developed sites and areas and all ORV open areas. 8...

  8. An assessment of the performance of municipal constructed wetlands in Ireland.

    PubMed

    Hickey, Anthony; Arnscheidt, Joerg; Joyce, Eadaoin; O'Toole, James; Galvin, Gerry; O' Callaghan, Mark; Conroy, Ken; Killian, Darran; Shryane, Tommy; Hughes, Francis; Walsh, Katherine; Kavanagh, Emily

    2018-03-15

    While performance assessments of constructed wetlands sites around the world have appraised their capacity for effective removal of organics, a large variance remains in these sites' reported ability to retain nutrients, which appears to depend on differences in design, operation and climate factors. Nutrient retention is a very important objective for constructed wetlands, to avoid eutrophication of aquatic environments receiving their effluents. This study assessed the performance of constructed wetlands in terms of nutrient retention and associated parameters under the humid conditions of Ireland's temperate maritime climate. A review of the performance of 52 constructed wetland sites from 17 local authorities aimed to identify the best performing types of constructed wetlands and the treatment factors determining successful compliance with environmental standards. Data analysis compared effluent results from constructed wetlands with secondary free surface flow or tertiary horizontal subsurface flow, hybrid systems and integrated constructed wetlands with those from small-scale mechanical wastewater treatment plants of the same size class. Nutrient concentrations in effluents of constructed wetlands were negatively correlated (p < .01) with specific area, i.e. the ratio of surface area and population equivalents. The latest generation of integrated constructed wetlands, which had applied design guidelines issued by the Department of the Environment, performed best. Storm management design features improved treatment performance of constructed wetlands significantly (p < .05) for total suspended solids concentrations and exceedance frequency of limit values for total nitrogen. Mechanical wastewater treatment plants, secondary free surface water and tertiary horizontal subsurface flow wetlands showed a very large variance in effluent concentrations for organic and nutrient parameters. E. coli numbers in effluents were lowest for integrated constructed wetlands with an arithmetic mean of 89 MPN/100 ml. Despite Ireland's humid climate, some constructed wetland sites achieved long or frequent periods of zero effluent discharge and thus did not transfer any waterborne pollution to their receptors during these periods. Copyright © 2018 Elsevier Ltd. All rights reserved.

  9. Resident's concerns and attitudes towards Solid Waste Management facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rahardyan, B.; Matsuto, T.; Kakuta, Y.

    2004-07-01

    Because of limited space, the siting and construction of a new SWM facility is a big challenge in Japan. An SWM facility should be socially accepted as well as environmentally and economically sound. This study aimed to investigate people's concerns about SWM facilities and their attitudes towards such facilities. A questionnaire was designed based on literature reviews and was sent to residents in three municipalities with different backgrounds. The questions covered concerns on the impact of an SWM facility, management aspects, unfairness of facility siting, and attitudes to facility construction. Of the many concerns, 'pollution and health effect' had themore » highest rating, followed by 'reliability', 'damage to nature' and 'cost'. The rating was different between municipalities, reflecting their geographic and social backgrounds. Using factor analysis, correlations among concerns were analyzed, and five principal components were extracted, namely 'pollution', 'nuisance', 'facility management', 'planning of facility', and 'merit/demerit'. Although obvious correlations were not found between individual items of concern and attitudes to construction of a facility, the discriminant analysis indicated dominant concerns of attitudes, but the disagreement between actual impact and citizens were found. As for attributes, the 'opposed' attitude decreased for residents who had visited an SWM facility, even if they had only seen it from outside.« less

  10. Graphical fault tree analysis for fatal falls in the construction industry.

    PubMed

    Chi, Chia-Fen; Lin, Syuan-Zih; Dewi, Ratna Sari

    2014-11-01

    The current study applied a fault tree analysis to represent the causal relationships among events and causes that contributed to fatal falls in the construction industry. Four hundred and eleven work-related fatalities in the Taiwanese construction industry were analyzed in terms of age, gender, experience, falling site, falling height, company size, and the causes for each fatality. Given that most fatal accidents involve multiple events, the current study coded up to a maximum of three causes for each fall fatality. After the Boolean algebra and minimal cut set analyses, accident causes associated with each falling site can be presented as a fault tree to provide an overview of the basic causes, which could trigger fall fatalities in the construction industry. Graphical icons were designed for each falling site along with the associated accident causes to illustrate the fault tree in a graphical manner. A graphical fault tree can improve inter-disciplinary discussion of risk management and the communication of accident causation to first line supervisors. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Virtually Out of This World!

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.

  12. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    NASA Astrophysics Data System (ADS)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  13. New thinking for the boiler room.

    PubMed

    Rose, Wayne

    2008-09-01

    Wayne Rose, marketing manager at integrated plant room manufacturer Armstrong Integrated Systems, explains how increasing use of off-site manufacture, the latest 3D modelling technology, and advances in control technology, are revolutionising boiler room design and construction.

  14. Seeking More Effective Management of Freshwater Pollution

    EPA Science Inventory

    The atmosphere contains airborne pollutants such as mercury, nitrogen oxides, and sulfur oxides released from automobiles, factories, and power plants. Similarly, land surfaces such as croplands, feedlots, logged forests, construction sites, and urban land surfaces may be reserv...

  15. Effects of highway construction on stream water quality and macroinvertebrate condition in a mid-atlantic highlands watershed, USA.

    PubMed

    Chen, Yushun; Viadero, Roger C; Wei, Xinchao; Fortney, Ronald; Hedrick, Lara B; Welsh, Stuart A; Anderson, James T; Lin, Lian-Shin

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.

  16. Unmanned aerial vehicles in construction and worker safety.

    PubMed

    Howard, John; Murashov, Vladimir; Branche, Christine M

    2018-01-01

    Applications of unmanned aerial vehicles (UAVs) for military, recreational, public, and commercial uses have expanded significantly in recent years. In the construction industry, UAVs are used primarily for monitoring of construction workflow and job site logistics, inspecting construction sites to assess structural integrity, and for maintenance assessments. As is the case with other emerging technologies, occupational safety assessments of UAVs lag behind technological advancements. UAVs may create new workplace hazards that need to be evaluated and managed to ensure their safe operation around human workers. At the same time, UAVs can perform dangerous tasks, thereby improving workplace safety. This paper describes the four major uses of UAVs, including their use in construction, the potential risks of their use to workers, approaches for risk mitigation, and the important role that safety and health professionals can play in ensuring safe approaches to the their use in the workplace. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  17. Waste diminution in Construction projects: Environmental Predicaments

    NASA Astrophysics Data System (ADS)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  18. EJSCREEN Indexes 2015 Public

    EPA Pesticide Factsheets

    There is an EJ Index for each environmental indicator. There are eight EJ Indexes in EJSCREEN reflecting the 8 environmental indicators. The EJ Index names are: Particulate Matter (PM2.5), Ozone Traffic Proximity and Volume, Lead Paint Indicator, Proximity to Risk Management Plan Sites, Proximity to National Priorities List Sites, Proximity to Treatment Storage and Disposal Facilities, and Proximity to Major Direct Water Dischargers. The EJ index is constructed as follows: EJ Index = (Environmental Indicator) * (Demographic Index for Block Group - Demographic Index for U.S.) * (Block Group Population)The EJ index is constructed as follows: EJ Index = (Environmental Indicator) * (Demographic Index for Block Group - Demographic Index for U.S.) * (Block Group Population)

  19. Performance Probability Distributions for Sediment Control Best Management Practices

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R.; Walsh, K.

    2007-12-01

    Controlling soil erosion and sediment transport can be a significant challenge during the construction process due to the extent and conditions of bare, disturbed soils. Best Management Practices (BMPs) are used as the framework for the design of sediment discharge prevention systems in stormwater pollution prevention plans which are typically required for construction sites. This research focuses on commonly-used BMP systems for perimeter control of sediment export: silt fences and fiber rolls. Although these systems are widely used, the physical and engineering parameters describing their performance are not well understood. Performance expectations are based on manufacturer results, but due to the dynamic conditions that exist on a construction site performance expectations are not always achievable in the field. Based on experimental results product performance is shown to be highly variable. Experiments using the same installation procedures show inconsistent sediment removal performances ranging from (>)85 percent to zero. The goal of this research is to improve the determination of off-site sediment yield based on probabilistic performance results of perimeter control BMPs. BMPs are evaluated in the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with a soil depth of 0.5 meters and a slope of 33 percent. The simulated storm event consists of 17 mm/hr for 20 minutes followed by 51 mm/hr for 30 minutes. The storm event is based on an ASTM design storm intended to simulate BMP failures. BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, less than optimal installations, and no treatment conditions. Preliminary results from 30 experiments are presented and used to develop probability distributions for BMP sediment removal efficiencies. The results are then combined with spatial and temporal distributions of perimeter sediment loadings for a construction site to estimate the time dependent risk of off-site sediment discharge over the duration of a project (ex., 0, 25, 50, 75 and 100 percent complete). The results are used to highlight the importance of considering all phases of construction when developing stormwater pollution prevention plans.

  20. Virtual Beach 3: User's Guide

    EPA Science Inventory

    Virtual Beach version 3 (VB3) is a decision support tool that constructs site-specific statistical models to predict fecal indicator bacteria (FIB) concentrations at recreational beaches. VB3 is primarily designed for beach managers responsible for making decisions regarding beac...

  1. Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

    DTIC Science & Technology

    2013-02-06

    Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These

  2. A system to test the ground surface conditions of construction sites--for safe and efficient work without physical strain.

    PubMed

    Koningsveld, Ernst; van der Grinten, Maarten; van der Molen, Henk; Krause, Frank

    2005-07-01

    Ground surface conditions on construction sites have an important influence on the health and safety of workers and their productivity. The development of an expert-based "working conditions evaluation" system is described, intended to assist site managers in recognising unsatisfactory ground conditions and remedying these. The system was evaluated in the period 2002-2003. The evaluation shows that companies recognize poor soil/ground conditions as problematic, but are not aware of the specific physical workload hazards. The developed methods allow assessment of the ground surface quality and selection of appropriate measures for improvement. However, barriers exist at present to wide implementation of the system across the industry. Most significant of these is that responsibility for a site's condition is not clearly located within contracting arrangements, nor is it a topic of serious negotiation.

  3. DEVELOPMENT OF A SAFETY COMMUNICATION AND RECOGNITION PROGRAM FOR CONSTRUCTION

    PubMed Central

    SPARER, EMILY H.; HERRICK, ROBERT F.; DENNERLEIN, JACK T.

    2017-01-01

    Leading-indicator–based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator–based (e.g., injury rates) programs. We designed a leading-indicator–based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite, and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. PMID:25815741

  4. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    NASA Astrophysics Data System (ADS)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory results are presented.

  5. A socio-ecological adaptive approach to contaminated mega-site management: from 'control and correct' to 'coping with change'.

    PubMed

    Schirmer, Mario; Lyon, Ken; Armstrong, James E; Farrell, Katharine N

    2012-01-01

    Mega-sites have a notable impact on surrounding ecological systems. At such sites there are substantial risks associated with complex socio-ecological interactions that are hard to characterize, let alone model and predict. While the urge to control and clean-up mega-sites (control and correct) is understandable, rather than setting a goal of cleaning up such sites, we suggest a more realistic response strategy is to address these massive and persistent sources of contamination by acknowledging their position as new features of the socio-ecological landscapes within which they are located. As it seems nearly impossible to clean up such sites, we argue for consideration of a 'coping with change' rather than a 'control and correct' approach. This strategy recognizes that the current management option for a mega-site, in light of its physical complexities and due to changing societal preferences, geochemical transformations, hydrogeology knowledge and remedial technology options may not remain optimal in future, and therefore needs to be continuously adapted, as community, ecology, technology and understanding change over time. This approach creates an opportunity to consider the relationship between a mega-site and its human and ecological environments in a different and more dynamic way. Our proposed approach relies on iterative adaptive management to incorporate mega-site management into the overall socio-ecological systems of the site's context. This approach effectively embeds mega-site management planning in a triple bottom line and environmental sustainability structure, rather than simply using single measures of success, such as contaminant-based guidelines. Recognizing that there is probably no best solution for managing a mega-site, we present a starting point for engaging constructively with this seemingly intractable issue. Therefore, we aim to initiate discussion about a new approach to mega-site management, in which the complexity of the problems posed by mega-sites is reflected upon in its entirety. These complexities are associated with uncertainties and unknowns that have to be addressed, as they have an impact on the strategies being developed and applied. We contend that the best that can be hoped for in mega-site management is an acceptable solution for the current state of affairs, with good flexibility to modify strategies as new site conditions, remediation possibilities, community preferences and management objectives develop over time. Copyright © 2011 Elsevier B.V. All rights reserved.

  6. [Management of the new first aid service at enterprises and construction sites].

    PubMed

    Prandi, E; Cantoni, S; Mosconi, G

    2006-01-01

    First aid at work organization and management represents a complex and critical aspect of the manifold problems of hygiene and security at work; nevertheless, even in relatively well organized productions, these themes are often neglected, if not completely ignored. In this work the authors analize the laws which regulate the correct first aid at work organization and management and an approach to the problem based on the preliminary risk assessment is suggested.

  7. Looking to the Future.

    ERIC Educational Resources Information Center

    College Planning & Management, 1997

    1997-01-01

    Ten possible trends on college campuses are examined. They include distance learning; rehabilitation of existing buildings; use of construction management firms; salaries for facilities directors; virtual universities; off-site garages; outside residence hall contractors; classrooms in residential buildings; and smart cards for entry and…

  8. STC synthesis of research results for water quality management at construction sites : research project capsule.

    DOT National Transportation Integrated Search

    2012-07-01

    The RAC Region II has initiated a collaborative research program consortium through the : Transportation Pooled Fund (TPF) Program. The research program is called the Southeast : Transportation Consortium (STC) and is intended to encourage coordinati...

  9. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  10. A Spanish model for quantification and management of construction waste.

    PubMed

    Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio

    2009-09-01

    Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.

  11. Appraisal of and response to social conditions in the great gulf wilderness: relationships among perceived crowding, rationalization, product shift, satisfaction, and future behavioral intentions

    Treesearch

    Rudy M. Schuster; David Cole; Troy Hall; Jennifer Baker; Rebecca Oreskes

    2007-01-01

    Purposes were to describe on-site social carrying capacity from the users' perspectives, provide management applications, and refi ne constructs of product shift and rationalization used by visitors as coping responses to crowding. Data were gathered using on-site exit surveys of hikers in the Great Gulf Wilderness and analyzed with descriptive statistics,...

  12. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Effects of highway construction on stream water quality and macroinvertebrate condition in a mid-Atlantic highlands watershed, USA

    USGS Publications Warehouse

    Welsh, Stuart A.; Chen, Yushun; Viadero, Stuart C.; Wei, Xinchao; Hedrick, Lara B.; Anderson, James T.; Lin, Lian-Shin

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997–2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.

  14. [Case Study] CityCenter and Cosmopolitan Construction Projects, Las Vegas, Nevada: lessons learned from the use of multiple sources and mixed methods in a safety needs assessment.

    PubMed

    Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y

    2010-06-01

    The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.

  15. Databases for multilevel biophysiology research available at Physiome.jp.

    PubMed

    Asai, Yoshiyuki; Abe, Takeshi; Li, Li; Oka, Hideki; Nomura, Taishin; Kitano, Hiroaki

    2015-01-01

    Physiome.jp (http://physiome.jp) is a portal site inaugurated in 2007 to support model-based research in physiome and systems biology. At Physiome.jp, several tools and databases are available to support construction of physiological, multi-hierarchical, large-scale models. There are three databases in Physiome.jp, housing mathematical models, morphological data, and time-series data. In late 2013, the site was fully renovated, and in May 2015, new functions were implemented to provide information infrastructure to support collaborative activities for developing models and performing simulations within the database framework. This article describes updates to the databases implemented since 2013, including cooperation among the three databases, interactive model browsing, user management, version management of models, management of parameter sets, and interoperability with applications.

  16. Storm Water Pollution Removal Performance of Compost Filter Socks

    USDA-ARS?s Scientific Manuscript database

    In 2005, the US Environmental Protection Agency National Menu of Best Management Practices (BMPs) listed compost filter socks as an approved BMP for controlling sediment in storm runoff on construction sites. Filtrexx International manufactures and distributes Filter Soxx (FS). Literature suggests...

  17. 40 CFR 440.148 - Best Management Practices (BMP).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... incursion into the plant site. (b) Berm construction: Berms, including any pond walls, dikes, low dams and... that pollutant materials removed from the process water and wastewater streams will be retained in... continue their effectiveness and to protect from unexpected and catastrophic failure. ...

  18. Chuckwalla Valley multiple-well monitoring site, Chuckwalla Valley, Riverside County

    USGS Publications Warehouse

    Everett, Rhett

    2013-01-01

    The U.S. Geological Survey (USGS), in cooperation with the Bureau of Land Management, is evaluating the geohydrology and water availability of the Chuckwalla Valley, California. As part of this evaluation, the USGS installed the Chuckwalla Valley multiple-well monitoring site (CWV1) in the southeastern portion of the Chuckwalla Basin. Data collected at this site provide information about the geology, hydrology, geophysics, and geochemistry of the local aquifer system, thus enhancing the understanding of the geohydrologic framework of the Chuckwalla Valley. This report presents construction information for the CWV1 multiple-well monitoring site and initial geohydrologic data collected from the site.

  19. Practical choices for infobutton customization: experience from four sites.

    PubMed

    Cimino, James J; Overby, Casey L; Devine, Emily B; Hulse, Nathan C; Jing, Xia; Maviglia, Saverio M; Del Fiol, Guilherme

    2013-01-01

    Context-aware links between electronic health records (EHRs) and online knowledge resources, commonly called "infobuttons" are being used increasingly as part of EHR "meaningful use" requirements. While an HL7 standard exists for specifying how the links should be constructed, there is no guidance on what links to construct. Collectively, the authors manage four infobutton systems that serve 16 institutions. The purpose of this paper is to publish our experience with linking various resources and specifying particular criteria that can be used by infobutton managers to select resources that are most relevant for a given situation. This experience can be used directly by those wishing to customize their own EHRs, for example by using the OpenInfobutton infobutton manager and its configuration tool, the Librarian Infobutton Tailoring Environment.

  20. Evaluation of environmental management resources (ISO 14001) at civil engineering construction worksites: a case study of the community of Madrid.

    PubMed

    Rodríguez, Gracia; Alegre, Francisco Javier; Martínez, Germán

    2011-07-01

    In recent years, significant advances have been made in business organization and management. The growing demands of clients as well as the globalization of world markets are among the many factors that have led to the establishment of systems of quality control and environmental management as a competitive strategy for businesses. When compared to other professional sectors, the construction sector has been slower to respond to environmental problems and to adopt Environmental Management Systems (EMS). In the world today the ISO 14001 standard is currently the main frame of reference used by construction companies to implement this type of management system. This article presents the results of a general study regarding the evaluation of the application of the ISO 14001 standard at civil engineering construction worksites in the Community of Madrid (Spain), specifically pertaining to requirement 4.4.1, Resources, roles, responsibilities, and authority. According to requirement 4.4.1, company executives should appoint people responsible for implementing the EMS and also specify their responsibilities and functions. The personnel designated for supervising environmental work should also have sufficient authority to establish and maintain the EMS. The results obtained were the following: - EMS supervisors did not generally possess adequate training and solid experience in construction work and in the environment. Furthermore, supervisors were usually forced to combine their environmental work with other tasks, which made their job even more difficult. - Generally speaking, supervisors were not given sufficient authority and autonomy because productivity at the construction site had priority over environmental management. This was due to the fact that the company management did not have a respectful attitude toward the environment, nor was the management actively involved in the establishment of the EMS. - Insufficient resources were allocated to the Environmental Management Unit. As a result, the application of EMSs in construction projects often appeared to be more of a formality, which was merely a way of maintaining the certification of the Environmental Management System. It was more a means of meeting the requirements for submitting a tender to contracting organisms rather than an indicator of any real commitment to improving the environmental performance of construction companies. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Event-based total suspended sediment particle size distribution model

    NASA Astrophysics Data System (ADS)

    Thompson, Jennifer; Sattar, Ahmed M. A.; Gharabaghi, Bahram; Warner, Richard C.

    2016-05-01

    One of the most challenging modelling tasks in hydrology is prediction of the total suspended sediment particle size distribution (TSS-PSD) in stormwater runoff generated from exposed soil surfaces at active construction sites and surface mining operations. The main objective of this study is to employ gene expression programming (GEP) and artificial neural networks (ANN) to develop a new model with the ability to more accurately predict the TSS-PSD by taking advantage of both event-specific and site-specific factors in the model. To compile the data for this study, laboratory scale experiments using rainfall simulators were conducted on fourteen different soils to obtain TSS-PSD. This data is supplemented with field data from three construction sites in Ontario over a period of two years to capture the effect of transport and deposition within the site. The combined data sets provide a wide range of key overlooked site-specific and storm event-specific factors. Both parent soil and TSS-PSD in runoff are quantified by fitting each to a lognormal distribution. Compared to existing regression models, the developed model more accurately predicted the TSS-PSD using a more comprehensive list of key model input parameters. Employment of the new model will increase the efficiency of deployment of required best management practices, designed based on TSS-PSD, to minimize potential adverse effects of construction site runoff on aquatic life in the receiving watercourses.

  2. Nassriya Water Treatment Plant Nassriya, Iraq. Sustainment Assessment

    DTIC Science & Technology

    2008-04-28

    Progress During Construction 8 Status of the WTP at Time of Turnover 11 Site Assessment 13 Continuing Problems for the Nassriya WTP 27...Future Plans for the Nassriya WTP 35 Conclusions 37 Recommendations 38 Management Comments 39 Evaluation of Management Comments 39...Appendices A. Scope and Methodology 40 B. FluorAmec’s Organizational Structure for the Nassriya WTP 41 C. FluorAmec’s Nassriya WTP Staffing Plan 42 D

  3. 49 CFR 238.203 - Static end strength.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., sufficient to describe the actual construction of the equipment; (iii) Engineering analysis sufficient to..., engineering analysis, and risk mitigation measures described in this paragraph, demonstrating that the use of... the Federal Docket Management System and posted on its web site at http://www.regulations.gov. (h...

  4. 49 CFR 238.203 - Static end strength.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., sufficient to describe the actual construction of the equipment; (iii) Engineering analysis sufficient to..., engineering analysis, and risk mitigation measures described in this paragraph, demonstrating that the use of... the Federal Docket Management System and posted on its web site at http://www.regulations.gov. (h...

  5. STC synthesis of research results for water quality management at construction sites : final report.

    DOT National Transportation Integrated Search

    2014-01-01

    The United States Environmental Protection Agency (EPA) lists sediment as the most common pollutant in U.S. streams, rivers, lakes, and : reservoirs. This is of significant importance to state Departments of Transportation (DOT) due to the large amou...

  6. Advanced Decision-Support for Coastal Beach Health: Virtual Beach 3.0

    EPA Science Inventory

    Virtual Beach is a free decision-support system designed to help beach managers and researchers construct, evaluate, and operate site-specific statistical models that can predict levels of fecal indicator bacteria (FIB) based on environmental conditions that are more readily mea...

  7. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  8. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  9. Century-scale records of land-based activities recorded in Mesoamerican coral cores.

    PubMed

    Carilli, Jessica E; Prouty, Nancy G; Hughen, Konrad A; Norris, Richard D

    2009-12-01

    The Mesoamerican Reef, the second-largest barrier reef in the world, is located in the western Caribbean Sea off the coasts of Mexico, Belize, Guatemala, and Honduras. Particularly in the south, the surrounding watersheds are steep and the climate is extremely wet. With development and agricultural expansion, the potential for negative impacts to the reef from land-based runoff becomes high. We constructed annually resolved century-scale records of metal/calcium ratios in coral skeletons collected from four sites experiencing a gradient of land-based runoff. Our proxy data indicate that runoff onto the reef has increased relatively steadily over time at all sites, consistent with land use trends from historical records. Sediment supply to the reef is greater in the south, and these more exposed reefs will probably benefit most immediately from management that targets runoff reduction. However, because runoff at all sites is steadily increasing, even distal sites will benefit from watershed management.

  10. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk; Poon, C.S.; Wong, Agnes

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS)more » to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.« less

  11. Development of a safety communication and recognition program for construction.

    PubMed

    Sparer, Emily H; Herrick, Robert F; Dennerlein, Jack T

    2015-05-01

    Leading-indicator-based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator-based (e.g., injury rates) programs. We designed a leading-indicator-based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  12. Biological assessment of the effects of construction and operation of adepleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Lonkhuyzen, R.

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a moremore » stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors along Little Beaver Creek, the Northwest Tributary stream, and a wooded area east of the X-100 facility. However, no Indiana bats were collected during surveys of these areas in 1994 and 1996. Locations A, B, and C do not support suitable habitat for the Indiana bat and would be unlikely to be used by Indiana bats. Indiana bat habitat also does not occur at Proposed Areas 1 and 2. Although Locations A and C contain small wooded areas, the small size and lack of suitable maturity of these areas indicate that they would provide poor habitat for Indiana bats. Trees that may be removed during construction would not be expected to be used for summer roosting by Indiana bats. Disturbance of Indiana bats potentially roosting or foraging in the vicinity of the facility during operations would be very unlikely, and any disturbance would be expected to be negligible. On the basis of these considerations, DOE concludes that the proposed action is not likely to adversely affect the Indiana bat. No critical habitat exists for this species in the action area. Although the timber rattlesnake occurs in the vicinity of the Portsmouth site, it has not been observed on the site. In addition, habitat for the timber rattlesnake is not present on the Portsmouth site. Therefore, DOE concludes that the proposed action would not affect the timber rattlesnake.« less

  13. Effects of highway construction on stream water quality and macroinvertebrate condition in a Mid-Atlantic Highlands watershed, USA

    USGS Publications Warehouse

    Chen, Y.; Viadero, R.C.; Wei, X.; Fortney, Ronald H.; Hedrick, Lara B.; Welsh, S.A.; Anderson, James T.; Lin, L.-S.

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region. Copyright ?? 2009 by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America. All rights reserved.

  14. Radioactive Waste Management and Environmental Contamination Issues at the Chernobyl Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Napier, Bruce A.; Schmieman, Eric A.; Voitsekhovitch, Oleg V.

    2007-11-01

    The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near surface waste-storage and disposal facilities. Trench and landfill type facilities were created from 1986 to 1987 in the Chernobyl Exclusion Zone at distances 0.5 to 15 km from the NPP site. This large number of facilities was established without proper design documentation, engineered barriers, ormore » hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100-years service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste management at the reactor site and in the Exclusion Zone, and especially for high-level and long-lived waste, has not been developed.« less

  15. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  16. Groundwater contamination from waste management sites: The interaction between risk-based engineering design and regulatory policy: 2. Results

    NASA Astrophysics Data System (ADS)

    Massmann, Joel; Freeze, R. Allan

    1987-02-01

    The risk-cost-benefit analysis developed in the companion paper (J. Massmann and R. A. Freeze, this issue) is here applied to (1) an assessment of the relative worth of containment-construction activities, site-exploration activities, and monitoring activities as components of a design strategy for the owner/operator of a waste management facility; (2) an assessment of alternative policy options available to a regulatory agency; and (3) a case history. Sensitivity analyses designed to address the first issue show that the allocation of resources by the owner/operator is sensitive to the stochastic parameters used to describe the hydraulic conductivity field at a site. For the cases analyzed, the installation of a dense monitoring network is of less value to the owner/operator than a more conservative containment design. Sensitivity analyses designed to address the second issue suggest that from a regulatory perspective, design standards should be more effective than performance standards in reducing risk, and design specifications on the containment structure should be more effective than those on the monitoring network. Performance bonds posted before construction have a greater potential to influence design than prospective penalties to be imposed at the time of failure. Siting on low-conductivity deposits is a more effective method of risk reduction than any form of regulatory influence. Results of the case history indicate that the methodology can be successfully applied at field sites.

  17. Improving construction site safety through leader-based verbal safety communication.

    PubMed

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures. Coaching construction site foremen to include safety in their daily verbal exchanges with workers has a significantly positive and lasting effect on the level of safety, which is a proximal estimate for work-related accidents. It is recommended that future studies include coaching and feedback at all organizational levels and for all involved parties in the construction process. Building client regulations could assign the task of coaching to the client appointed safety coordinators or a manager/supervisor, and studies should measure longitudinal effects of coaching by following foremen and their work gangs from site to site. Copyright © 2010 National Safety Council and Elsevier Ltd. Published by Elsevier Ltd. All rights reserved.

  18. Basic repository source term and data sheet report: Lavender Canyon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This report is one of a series describing studies undertaken in support of the US Department of Energy Civilian Radioactive Waste Management (CRWM) Program. This study contains the derivation of values for environmental source terms and resources consumed for a CRWM repository. Estimates include heavy construction equipment; support equipment; shaft-sinking equipment; transportation equipment; and consumption of fuel, water, electricity, and natural gas. Data are presented for construction and operation at an assumed site in Lavender Canyon, Utah. 3 refs; 6 tabs.

  19. REPORT OF THE 1995 WORKSHOP ON GEOSYNTHETIC CLAY LINERS

    EPA Science Inventory

    A workshop was held at the EPA's National Risk Management Research Laboratory in Cincinnati, Ohio, on August 9 and 10, 1995. On August 9, attendees were shown field plots of GCLs that have been constructed at a site in Cincinnati, and given a detailed account of the test plot la...

  20. School Indoor Air Quality Best Management Practices Manual.

    ERIC Educational Resources Information Center

    Hall, Richard; Ellis, Richard; Hardin, Tim

    This manual, written in response to requirements of the Washington State legislature, focuses on practices which can be undertaken during the siting, design, construction, or renovation of a school, recommends practices to help ensure good indoor air quality during building occupancy, and suggests protocols and useful reference documents for…

  1. Evaluating Best Management Practices and Correlations Between Culture and Molecular Data at a Cattle Feeding Operation and Nearby Stream

    EPA Science Inventory

    Presentation will include: Evaluate the performance of an infiltration basin and constructed wetland in a cattle-feeding operation (culture data only); Examine the correlation between culture data and qPCR measurements at two different research sites; Describe the relationship b...

  2. Safety Challenges and Improvement Strategies of Ethnic Minority Construction Workers: A Case Study in Hong Kong.

    PubMed

    Wu, Chunlin; Luo, Xiaowei; Wang, Tao; Wang, Yue; Sapkota, Bibek

    2018-04-18

    Due to cultural differences, ethnic minority construction workers are more difficult to manage and more vulnerable to accidents. This study aims to identify the major barriers faced by ethnic minority workers from their own perspectives and determine potential strategies to enhance safety climate of construction projects, thus ultimately improve their safety performance. A survey with modified Nordic safety climate questionnaire was conducted in a certain sub-contractor in Hong Kong. In-depth interviews, status quo description, major challenge investigation and safety knowledge tests were carried as well. The top three most important safety challenges identified are improper stereotypes from the whole industry, lack of opportunities for job assignment, and language barriers. To improve the safety performance, employers should allocate sufficient personal protective equipment and governments should organize unannounced site visits more frequently. Besides, the higher-level management should avoid giving contradictory instructions to foremen against to the standards of supervisors.

  3. Data collected to support monitoring of constructed emergent sandbar habitat on the Missouri River downstream from Gavins Point Dam, South Dakota and Nebraska, 2004-06

    USGS Publications Warehouse

    Thompson, Ryan F.; Johnson, Michaela R.; Andersen, Michael J.

    2007-01-01

    The U.S. Army Corps of Engineers has constructed emergent sandbar habitat on sections of the Missouri River bordering South Dakota and Nebraska downstream from Gavins Point Dam to create and enhance habitat for threatened and endangered bird species. Two areas near river miles 761.3 and 769.8 were selected for construction of emergent sandbar habitat. Pre- and postconstruction data were collected by the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, to evaluate the success of the habitat management techniques. Data collected include pre- and postconstruction channel-geometry data (bathymetric and topographic) for areas upstream from, downstream from, and within each construction site. Water-velocity data were collected for selected parts of the site near river mile 769.8. Instruments and methods used in data collection, as well as quality-assurance and quality-control measures, are described. Geospatial channel-geometry data are presented for transects of the river channel as cross sections and as geographical information system shapefiles. Geospatial land-surface elevation data are provided for part of each site in the form of a color-shaded relief map. Geospatial water-velocity data also are provided as color-shaded maps and geographical information system shapefiles.

  4. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  5. Safety climate and safety behaviors in the construction industry: The importance of co-workers commitment to safety.

    PubMed

    Schwatka, Natalie V; Rosecrance, John C

    2016-06-16

    There is growing empirical evidence that as safety climate improves work site safety practice improve. Safety climate is often measured by asking workers about their perceptions of management commitment to safety. However, it is less common to include perceptions of their co-workers commitment to safety. While the involvement of management in safety is essential, working with co-workers who value and prioritize safety may be just as important. To evaluate a concept of safety climate that focuses on top management, supervisors and co-workers commitment to safety, which is relatively new and untested in the United States construction industry. Survey data was collected from a cohort of 300 unionized construction workers in the United States. The significance of direct and indirect (mediation) effects among safety climate and safety behavior factors were evaluated via structural equation modeling. Results indicated that safety climate was associated with safety behaviors on the job. More specifically, perceptions of co-workers commitment to safety was a mediator between both management commitment to safety climate factors and safety behaviors. These results support workplace health and safety interventions that build and sustain safety climate and a commitment to safety amongst work teams.

  6. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  7. Colonization of UK coastal realignment sites by mosquitoes: implications for design, management, and public health.

    PubMed

    Medlock, J M; Vaux, A G C

    2013-06-01

    Coastal realignment is now widely instituted in the UK as part of local flood risk management plans to compensate for the loss of European protected habitat and to mitigate the effects of sea-level rise and coastal squeeze. Coastal aquatic habitats have long been known to provide suitable habitats for brackish-water mosquitoes and historically, coastal marshes were considered to support anopheline mosquito populations that were responsible for local malaria transmission. This study surveyed the eight largest managed realignment (MRA) sites in England (Essex and the Humber) for mosquito habitats. The apparent absence of anopheline mosquitoes exploiting aquatic habitats at all of these sites suggests that the risk of malaria associated with MRA sites is currently negligible. However, three of the eight sites supported populations of two nuisance and potential arboviral vector species, Aedes detritus and Aedes caspius. The aquatic habitats that supported mosquitoes resulted from a) specific design aspects of the new sea wall (ballast to mitigate wave action and constructed saline borrow ditches) that could be designed out or managed or b) isolated pools created through silt accretion or expansion of flooded zones to neighbouring pasture. The public health risks and recommendations for management are discussed in this report. This report highlights the need for pro-active public health impact assessments prior to MRA development in consultation with the Health Protection Agency, as well as the need for a case-by-case approach to design and management to mitigate mosquito or mosquito-borne disease issues now and in the future. © 2013 The Society for Vector Ecology.

  8. Construction and demolition waste generation rates for high-rise buildings in Malaysia.

    PubMed

    Mah, Chooi Mei; Fujiwara, Takeshi; Ho, Chin Siong

    2016-12-01

    Construction and demolition waste continues to sharply increase in step with the economic growth of less developed countries. Though the construction industry is large, it is composed of small firms with individual waste management practices, often leading to the deleterious environmental outcomes. Quantifying construction and demolition waste generation allows policy makers and stakeholders to understand the true internal and external costs of construction, providing a necessary foundation for waste management planning that may overcome deleterious environmental outcomes and may be both economically and environmentally optimal. This study offers a theoretical method for estimating the construction and demolition project waste generation rate by utilising available data, including waste disposal truck size and number, and waste volume and composition. This method is proposed as a less burdensome and more broadly applicable alternative, in contrast to waste estimation by on-site hand sorting and weighing. The developed method is applied to 11 projects across Malaysia as the case study. This study quantifies waste generation rate and illustrates the construction method in influencing the waste generation rate, estimating that the conventional construction method has a waste generation rate of 9.88 t 100 m -2 , the mixed-construction method has a waste generation rate of 3.29 t 100 m -2 , and demolition projects have a waste generation rate of 104.28 t 100 m -2 . © The Author(s) 2016.

  9. Safe, Cost Effective Management of Inactive Facilities at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W. E.; Yannitell, D. M.; Freeman, D. W.

    The Savannah River Site is part of the U.S. Department of Energy complex. It was constructed during the early 1950s to produce basic materials (such as plutonium-239 and tritium) used in the production of nuclear weapons. The 310-square-mile site is located in South Carolina, about 12 miles south of Aiken, South Carolina, and about 15 miles southeast of Augusta, Georgia. Savannah River Site (SRS) has approximately 200 facilities identified as inactive. These facilities range in size and complexity from large nuclear reactors to small storage buildings. These facilities are located throughout the site including three reactor areas, the heavy watermore » plant area, the manufacturing area, and other research and support areas. Unlike DOE Closure Sites such as Hanford and Rocky Flats, SRS is a Project Completion Site with continuing missions. As facilities complete their defined mission, they are shutdown and transferred from operations to the facility disposition program. At the SRS, Facilities Decontamination and Decommissioning (FDD) personnel manage the disposition phase of a inactive facility's life cycle in a manner that minimizes life cycle cost without compromising (1) the health or safety of workers and the public or (2) the quality of the environment. The disposition phase begins upon completion of operations shutdown and extends through establishing the final end-state. FDD has developed innovative programs to manage their responsibilities within a constrained budget.« less

  10. EarthScope's Transportable Array: Advancing Eastward

    NASA Astrophysics Data System (ADS)

    Busby, R. W.; Vernon, F.; Newman, R. L.; Astiz, L.

    2006-12-01

    EarthScope's Transportable Array has installed more than 200 high-quality broadband seismic stations over the last 3 years in the western US. These stations have a nominal spacing of 70 km and are part of an eventual 400 station array that migrates from west to east at a rate of 18 stations per month. The full 400 stations will be operating by September 2007. Stations have a residence time of about 2 years before being relocated to the next site. Throughout the continental US, 1623 sites are expected to be occupied. Standardized procedures and protocols have been developed to streamline all aspects of Transportable Array operations, from siting to site construction and installation to equipment purchasing and data archiving. Earned Value Management tools keep facility installation and operation on budget and schedule. A diverse, yet efficient, infrastructure installs and maintains the Transportable Array. Sensors, dataloggers, and other equipment are received and tested by the IRIS PASSCAL Instrument Center and shipped to regional storage facilities. To engage future geoscientists in the project, students are trained to conduct field and analytical reconnaissance to identify suitable seismic station sites. Contract personnel are used for site verification; vault construction; and installation of sensors, power, and communications systems. IRIS staff manages permitting, landowner communications, and station operations and maintenance. Seismic signal quality and metadata are quality-checked at the Array Network Facility at the University of California-San Diego and simultaneously archived at the IRIS Data Management Center in Seattle. Station equipment has been specifically designed for low power, remote, unattended operation and uses diverse two-way IP communications for real-time transmission. Digital cellular services, VSAT satellite, and commercial DSL, cable or wireless transport services are employed. Automatic monitoring of status, signal quality and earthquake event detection as well as operational alarms for low voltage and water intrusion are performed by a robust data acquisition package. This software is coupled with a host of network management tools and display managers operated by the Array Network Facility to allow managers, field personnel, and network operations staff to visualize array performance in real-time and to access historical information for diagnostics. Current data recording proficiency is 99.1%, with real-time telemetry averaging about 91%. EarthScope, IRIS and the USGS are working with regional seismic network operators, both existing and newly formed, to transition some of the Transportable Array stations into regional network assets. Each region has unique circumstances and interested parties are invited to exchange ideas on how this might be accomplished in their area. Contact busby@iris.edu for more information.

  11. Haiti: Feasibility of Waste-to-Energy Options at the Trutier Waste Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrad, M. D.; Hunsberger, R.; Ness, J. E.

    2014-08-01

    This report provides further analysis of the feasibility of a waste-to-energy (WTE) facility in the area near Port-au-Prince, Haiti. NREL's previous analysis and reports identified anaerobic digestion (AD) as the optimal WTE technology at the facility. Building on the prior analyses, this report evaluates the conceptual financial and technical viability of implementing a combined waste management and electrical power production strategy by constructing a WTE facility at the existing Trutier waste site north of Port-au-Prince.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zoeller, W.; Slattery, M.; Grab, J.

    In 2009, Mass Development issued an RFQ and subsequent RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A).

  13. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    PubMed

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, P<0.001), enhanced safety behavior (β=0.15, P<0.001), and fewer accidents [odds ratio (OR) 0.78, 95% confidence interval (95% CI) 0.62-0.98]. The effect of rule-oriented leadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, P<0.001), suggesting that when rules and plans are established in a collaborative manner, workers' motivation to comply with safety regulations and participate in proactive safety activities is elevated. The influence of leadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  14. Innovation and construction management in Brazil: Challenges of companies in times of quality and productivity

    NASA Astrophysics Data System (ADS)

    Barbosa, A. A. R.; Vilnītis, M.

    2017-10-01

    Considering the efforts to optimize productivity and quality in the construction through the potential existing in the respective companies, this study presents an approach for identification, management and priorities of improvements actions at construction sites focusing status on productivity, added value and innovation in the socioeconomic context and scenario of construction industry in Brazil. Technological advances in recent years have made the Brazilian construction industry gradually incorporate technologies and forms of management, despite its traditionally conservative character. In current days, the innovations are pursued with the quest for greater quality, productivity, safety and customer satisfaction, which have been increasingly competitive and global. Construction in Brazil occupies an important role in the economy, directly contributing to GDP and acting on an extensive productive chain of suppliers, commercialization services and maintenance. The Brazilian construction sector has undergone major changes in recent years, facilitated by factors such as the resumption of public investments, the creation of laws that facilitate real estate, investments and funding of external resources, and the efforts of the Brazilian Quality and Productivity Program - PBQP H. However, the sector faces problems of a lack of skilled labour to meet the growth needs of the sector. There are still problems and challenges of quality and productivity that prevent full sector development. The aspects of nonconformity, low quality, high tax burden, outsourcing and informality of the workforce have not been adequately addressed and resolved. Through the use of indicators of productivity and growth, the challenges of the Brazilian construction industry are discussed and the possible paths for the sector that allow its full development and to reduce the distance between the Brazilian construction industry and that of the developed countries.

  15. Hydraulic characteristics of low-impact development practices in northeastern Ohio, 2008–2010

    USGS Publications Warehouse

    Darner, Robert A.; Dumouchelle, Denise H.

    2011-01-01

    Low-impact development (LID) is an approach to managing stormwater as near to its source as possible; this is accomplished by minimizing impervious surfaces and promoting more natural infiltration and evapotranspiration than is typically associated with developed areas. Two newly constructed LID sites in northeastern Ohio were studied to document their hydraulic characteristics. A roadside best-management practice (BMP) was constructed by replacing about 1,400 linear feet of existing ditches with a bioswale/rain garden BMP consisting of a grassed swale interspersed with rain-garden/overflow structures. The site was monitored in 2008, 2009, and 2010. Although some overflows occurred, numerous precipitation events exceeding the 0.75-inch design storm did not result in overflows. A second study site consists of an 8,200-square-foot parking lot made of a pervious pavers and a rain garden that receives runoff from the roof of a nearby commercial building. A comparison of data from 2009 and 2010 indicates that the median runoff volume in 2010 decreased relative to 2009. The centroid lag times (time difference between centroid of precipitation and centroid of flow) decreased in 2010, most likely due to more intense, shorter duration precipitation events and maturation of the rain garden. Additional data could help quantify the relation between meteorological variables and BMP efficiency.

  16. Correlation between safety climate and contractor safety assessment programs in construction

    PubMed Central

    Sparer, EH1; Murphy, LA; Taylor, KM; Dennerlein, Jt

    2015-01-01

    Background Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Methods 401 construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. Results There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers’ safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. Conclusions A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. PMID:24038403

  17. Images of Imaging: Notes on Doing Longitudinal Field Work.

    ERIC Educational Resources Information Center

    Barley, Stephen R.

    1990-01-01

    Discusses the processes involved in a field study of technological change in radiology and how researchers can design a qualitative study and then collect data in a systematic and explicit manner. Illustrates the social and human problems of gaining entry into a research site, constructing a research role, and managing relationships. (63…

  18. Planetary Data Archiving Plan at JAXA

    NASA Astrophysics Data System (ADS)

    Shinohara, Iku; Kasaba, Yasumasa; Yamamoto, Yukio; Abe, Masanao; Okada, Tatsuaki; Imamura, Takeshi; Sobue, Shinichi; Takashima, Takeshi; Terazono, Jun-Ya

    After the successful rendezvous of Hayabusa with the small-body planet Itokawa, and the successful launch of Kaguya to the moon, Japanese planetary community has gotten their own and full-scale data. However, at this moment, these datasets are only available from the data sites managed by each mission team. The databases are individually constructed in the different formats, and the user interface of these data sites is not compatible with foreign databases. To improve the usability of the planetary archives at JAXA and to enable the international data exchange smooth, we are investigating to make a new planetary database. Within a coming decade, Japan will have fruitful datasets in the planetary science field, Venus (Planet-C), Mercury (BepiColombo), and several missions in planning phase (small-bodies). In order to strongly assist the international scientific collaboration using these mission archive data, the planned planetary data archive at JAXA should be managed in an unified manner and the database should be constructed in the international planetary database standard style. In this presentation, we will show the current status and future plans of the planetary data archiving at JAXA.

  19. Technical and design update in the AUBE French low-level radioactive waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marque, Y.

    1989-01-01

    Long-term industrial management of radioactive waste in France is carried out by the Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA). ANDRA is in charge of design, siting, construction, and operation of disposal centers. The solution selected in France for the disposal of low- and medium-level, short-lived radioactive waste is near-surface disposal in the earth using the principle of multiple barriers, in accordance with national safety rules and regulations, and based on operating experience from the Centre de Stockage de la Manche. Since the center's start-up in 1969, 400,000 m{sup 3} of waste have been disposed of. The Frenchmore » national program for waste management is proceeding with the construction of a second near-surface disposal, which is expected to be operational in 1991. It is located in the department of AUBE (from which its name derives), 100 miles southeast of Paris. The paper describes the criteria for siting and design of the AUBE disposal facility, design of the AUBE facility disposal module, and comparison with North Carolina and Pennsylvania disposal facility designs.« less

  20. Estimation of the annual production and composition of C&D Debris in Galicia (Spain).

    PubMed

    Martínez Lage, Isabel; Martínez Abella, Fernando; Herrero, Cristina Vázquez; Ordóñez, Juan Luis Pérez

    2010-04-01

    One of the key aspects that must be taken into consideration within the framework of Sustainable Construction is the management of Construction and Demolition (C&D) Debris. As for other types of waste, specific handling procedures are required to manage C&D Debris; these include reduction, reuse, recycling, and if all other possibilities fail, recovery or disposal. For public planning strategies aimed at the management of C&D Debris to be effective, it is first necessary to have specific knowledge of the type of waste materials generated in a particular region. After verifying that the methods available to determine the production and composition of C&D Debris are limited, this paper presents a procedure to ascertain the production and composition of C&D Debris, in any region. The procedure utilizes data on the surface areas of newly constructed buildings, renovations and demolitions, which are estimated from available data for recent years, as well as information on the quantity of debris generated per surface area in any type of construction site, which is obtained from recently executed constructions or from the ground plans of older buildings. The method proposed here has been applied to Galicia, one of Spain's autonomous communities, for which the quantity and composition of C&D Debris have been estimated for the horizon year 2011. Copyright 2009 Elsevier Ltd. All rights reserved.

  1. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  2. Consequences of least tern (Sternula antillarum) microhabitat nest-site selection on natural and mechanically constructed sandbars in the Missouri River

    USGS Publications Warehouse

    Stucker, Jennifer H.; Buhl, Deborah A.; Sherfy, Mark H.

    2013-01-01

    Nest-habitat selection in colonial species has rarely been assessed at multiple spatial scales to evaluate its fitness consequences. Management for the federally endangered U.S. Interior population of Least Terns (Sternula antillarum) has focused on maintenance of breeding habitats, including mechanical construction of sandbars from dredged material. Least Terns are attracted to large areas of unvegetated substrate, yet small-scale habitat features are thought to trigger selection for nesting. We evaluated nest-scale habitat selection to determine (1) whether selection differs between constructed and natural sandbars and (2) the subsequent consequences of habitat selection on nest success. During 2006–2008, we examined 869 Least Tern nest sites on constructed and natural sandbars in the Missouri River for evidence of microhabitat selection at the nest in relation to habitat within the surrounding 3-m area. Least Tern nest sites had coarser and larger substrate materials at the nest, more debris, and less vegetation than the surrounding area. Nests in constructed habitats had a greater percentage of coarse substrates and less vegetation or debris than nests in naturally created habitats. Apparent nest success was 1.8× greater on constructed than on natural sandbars. Nest success was best predicted by models with two spatial scales of predictors, including substrates (nest) and vegetation and debris (nest or surrounding area). Our results indicate that Least Terns select nest microhabitat characteristics that are associated with wind- and water-scoured habitats, and that nest success increases when these habitats are selected.

  3. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  4. Capacitated location of collection sites in an urban waste management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghiani, Gianpaolo, E-mail: gianpaolo.ghiani@unisalento.it; Itaca S.r.l., via P. Bucci 41C, 87036 Rende; Lagana, Demetrio, E-mail: dlagana@deis.unical.it

    2012-07-15

    Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the location of waste collection sites. In this paper, we propose an integer programming model that helps decision makers in choosing the sites where to locate the unsorted waste collection bins in a residential town, as well as the capacities of the bins to be located at each collection site. This model helps in assessing tactical decisions through constraints that forcemore » each collection area to be capacitated enough to fit the expected waste to be directed to that area, while taking into account Quality of Service constraints from the citizens' point of view. Moreover, we propose an effective constructive heuristic approach whose aim is to provide a good solution quality in an extremely reduced computational time. Computational results on data related to the city of Nardo, in the south of Italy, show that both exact and heuristic approaches provide consistently better solutions than that currently implemented, resulting in a lower number of activated collection sites, and a lower number of bins to be used.« less

  5. Site selection for managed aquifer recharge using fuzzy rules: integrating geographical information system (GIS) tools and multi-criteria decision making

    NASA Astrophysics Data System (ADS)

    Malekmohammadi, Bahram; Ramezani Mehrian, Majid; Jafari, Hamid Reza

    2012-11-01

    One of the most important water-resources management strategies for arid lands is managed aquifer recharge (MAR). In establishing a MAR scheme, site selection is the prime prerequisite that can be assisted by geographic information system (GIS) tools. One of the most important uncertainties in the site-selection process using GIS is finite ranges or intervals resulting from data classification. In order to reduce these uncertainties, a novel method has been developed involving the integration of multi-criteria decision making (MCDM), GIS, and a fuzzy inference system (FIS). The Shemil-Ashkara plain in the Hormozgan Province of Iran was selected as the case study; slope, geology, groundwater depth, potential for runoff, land use, and groundwater electrical conductivity have been considered as site-selection factors. By defining fuzzy membership functions for the input layers and the output layer, and by constructing fuzzy rules, a FIS has been developed. Comparison of the results produced by the proposed method and the traditional simple additive weighted (SAW) method shows that the proposed method yields more precise results. In conclusion, fuzzy-set theory can be an effective method to overcome associated uncertainties in classification of geographic information data.

  6. Environmental Assessment for the Construction and Operation of a New Shoppette/Gas Station, Class Six Store, and Name-Brand Fast Food Store at Joint Base Andrews Camp Springs, Prince George’s County, Maryland

    DTIC Science & Technology

    2010-02-01

    approximately 3.0-acre site. The facility would include retail gasoline sales through the installation of three 20,000-gallon double -walled tanks; 16 multi...construction activities; soil erosion control methods and best management practices would reduce potential for effects; additional impervious surfaces...through the installation of three 20,000-gallon, double -walled tanks; 16 multi- product dispensers with 32 fuel dispenser nozzles; a canopy roofing

  7. An expert system for municipal solid waste management simulation analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsieh, M.C.; Chang, N.B.

    1996-12-31

    Optimization techniques were usually used to model the complicated metropolitan solid waste management system to search for the best dynamic combination of waste recycling, facility siting, and system operation, where sophisticated and well-defined interrelationship are required in the modeling process. But this paper applied the Concurrent Object-Oriented Simulation (COOS), a new simulation software construction method, to bridge the gap between the physical system and its computer representation. The case study of Kaohsiung solid waste management system in Taiwan is prepared for the illustration of the analytical methodology of COOS and its implementation in the creation of an expert system.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA ECOLOGICAL SERVICES

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test andmore » Evaluation Complex (NPTEC).« less

  9. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  10. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  11. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  12. Corrosion Management of the Hanford High-Level Nuclear Waste Tanks

    NASA Astrophysics Data System (ADS)

    Beavers, John A.; Sridhar, Narasi; Boomer, Kayle D.

    2014-03-01

    The Hanford site is located in southeastern Washington State and stores more than 200,000 m3 (55 million gallons) of high-level radioactive waste resulting from the production and processing of plutonium. The waste is stored in large carbon steel tanks that were constructed between 1943 and 1986. The leak and structurally integrity of the more recently constructed double-shell tanks must be maintained until the waste can be removed from the tanks and encapsulated in glass logs for final disposal in a repository. There are a number of corrosion-related threats to the waste tanks, including stress-corrosion cracking, pitting corrosion, and corrosion at the liquid-air interface and in the vapor space. This article summarizes the corrosion management program at Hanford to mitigate these threats.

  13. Cancer Research Center Indiana University School of Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less

  14. 76 FR 64977 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... the NRC to assess the adequacy of proposed seismic design bases and the design bases for other site..., designed, constructed, and maintained to withstand geologic hazards, such as faulting, seismic hazards, and... potential man-made hazards will be appropriately accounted for in the design of nuclear power and test...

  15. "I Would Just like to Be Known as an Athlete": Managing Hegemony, Femininity, and Heterosexuality in Female Sport

    ERIC Educational Resources Information Center

    Mean, Lindsey J.; Kassing, Jeffrey W.

    2008-01-01

    The community of sport is a powerful site for the construction of masculinity, male identities, and heterosexuality. Consequently, the increased entry of women into the sporting arena has been actively resisted, with women athletes either excluded or framed within traditional, sexualized discourses of femininity and heterosexuality. Yet Title IX…

  16. Planning for a New Generation of Public Library Buildings. The Greenwood Library Management Collection.

    ERIC Educational Resources Information Center

    McCabe, Gerard B.

    This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…

  17. A suggested color scheme for reducing perception-related accidents on construction work sites.

    PubMed

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Observation-well network for collection of ground-water level data in Massachusetts

    USGS Publications Warehouse

    Socolow, Roy S.

    1994-01-01

    Aquifers--water-bearing deposits of sand and gravel, glacial till, and fractured bedrock--provide an extensive and readily accessible ground-water supply in Massachusetts. Ground water affects our everyday lives, not just in terms of how much water is available, but also in terms of the position of ground-water levels in relation to land surface. Knowledge of ground-water levels is needed by Federal, State, and local agencies to help plan, manage, and protect ground-water supplies, and by private construction companies for site planning and evaluation. A primary part of the mission of the U.S. Geological Survey (USGS), Water Resources Division, is the systematic collection of ground-water, surface-water, and water-quality data. These data are needed to manage and protect the nation's water resources. The Massachusetts-Rhode Island District of the USGS, in cooperation with the Massachusetts Department of Environmental Management (DEM), Office of Water Resources, and county and town environmental agencies, has maintained a network of observation wells throughout the Commonwealth since the mid 1930's. The purpose of this network is to monitor seasonal and long-term changes in groundwater storage in different lithologic, topographic, and geographic settings. These data are analyzed to provide a monthly index of ground-water conditions to aid in water-resources management and planning, and to define long-term changes in water levels resulting from manmade stresses (such as pumping and construction-site drainage) and natural stresses (such as floods and droughts).

  19. Risk of Contractors’ Claims On the Example of Road Works

    NASA Astrophysics Data System (ADS)

    Rybka, Iwona; Bondar-Nowakowska, Elżbieta; Pawluk, Katarzyna; Połoński, Mieczysław

    2017-10-01

    The aim of the study is to analyse claims filed by building contractors during the project implementation. The work is divided into two parts. In the first part problems associated with the management of claims in the construction process were discussed. Bearing in mind that claims may result in prolongation of the investment or exceeding planned budget, possibilities of applying information included in documents connected with claims procedure to risk management was analysed in the second part of the study. The basis of the analysis is a review of 226 documents. They originate from 8 construction sites completed in the last 5 years in southwestern Poland. In each case, these were linear road projects, executed by different contractors, according to conditions in the contract set out in the “Yellow Book” FIDIC. In the study, other documents relating events that according to contractors entitled them to claim were also analysed. They included among others: project documentation, terms of reference, construction log, reports and correspondence under the contract. The events constituting the reason for contractors` claims were classified according to their sources. 8 areas of potential threats were distinguished. They were presented in the form of a block diagram. Most events initiating the claims were reported in the following group - adverse actions of third parties, while the fewest were recorded in the group - the lack of access to the construction site. Based on calculated similarity indicators it was found that considered construction sites were diversified in terms of the number of the events occurrence that generated the claim and their sources. In recent years, many road projects are completed behind the schedule and their initially planned budgets are significantly exceeded. Conducted research indicated that data derived from the analysis of documents connected with claims can be applied to identify and classify both cost and schedule risk factors. Obtained data can also be useful at the stage of risk control because early diagnosis of threats in relation to technical and organizational aspects is necessary to take effective action.

  20. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain.

    PubMed

    Ortiz, O; Pasqualino, J C; Castells, F

    2010-04-01

    The main objective of this paper is to evaluate environmental impacts of construction wastes in terms of the LIFE 98 ENV/E/351 project. Construction wastes are classified in accordance with the Life Program Environment Directive of the European Commission. Three different scenarios to current waste management from a case study in Catalonia (Spain) have been compared: landfilling, recycling and incineration, and these scenarios were evaluated by means of Life Cycle Assessment. The recommendations of the Catalan Waste Catalogue and the European Waste Catalogue have been taken into account. Also, the influence of transport has been evaluated. Results show that in terms of the Global Warming Potential, the most environmentally friendly treatment was recycling, followed by incineration and lastly landfilling. According to the influence of treatment plants location on the GWP indicator, we observe that incineration and recycling of construction wastes are better than landfilling, even for long distances from the building site to the plants. This is true for most wastes except for the stony types, than should be recycled close to the building site. In summary, data from construction waste of a Catalan case study was evaluated using the well established method of LCA to determine the environmental impacts. Copyright 2009 Elsevier Ltd. All rights reserved.

  1. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ortiz, O., E-mail: oscarortiz@unipamplona.edu.c; University of Pamplona, Department of Industrial Engineering, Km 1 Via Bucaramanga, Pamplona, N de S; Pasqualino, J.C.

    2010-04-15

    The main objective of this paper is to evaluate environmental impacts of construction wastes in terms of the LIFE 98 ENV/E/351 project. Construction wastes are classified in accordance with the Life Program Environment Directive of the European Commission. Three different scenarios to current waste management from a case study in Catalonia (Spain) have been compared: landfilling, recycling and incineration, and these scenarios were evaluated by means of Life Cycle Assessment. The recommendations of the Catalan Waste Catalogue and the European Waste Catalogue have been taken into account. Also, the influence of transport has been evaluated. Results show that in termsmore » of the Global Warming Potential, the most environmentally friendly treatment was recycling, followed by incineration and lastly landfilling. According to the influence of treatment plants location on the GWP indicator, we observe that incineration and recycling of construction wastes are better than landfilling, even for long distances from the building site to the plants. This is true for most wastes except for the stony types, than should be recycled close to the building site. In summary, data from construction waste of a Catalan case study was evaluated using the well established method of LCA to determine the environmental impacts.« less

  2. Study on the quality of FRP fishing vessel based on improved Fishbone Chart

    NASA Astrophysics Data System (ADS)

    Sui, J. H.; Yu, Y. F.; Du, Q. F.; Jiang, D. W.

    2018-01-01

    The construction quality of FRP fishing vessels influences their production, use and industry development. In order to explore the factors that affect the construction quality of FRP fishing vessels, key factors affecting the construction quality of FRP fishing vessels are determined based on the quality problems of FRP fishing vessels constructed. The improved Fishbone Chart is used to analyze the eight factors of “human, machine, material, process, environment, inspection, design and information”. Taking the factors that affect the construction quality of FRP fishing vessels as the central target, the eight influencing factors were condensed into five aspects and a composite Fishbone Chart is drawn. The Fishbone Chart is used as the basic model, the influencing factors are sorted, screened and discriminated, and the system model convenient for construction site management and control is established. Finally, the causes of poor construction of FRP fishing vessels are analyzed and discussed, and relevant suggestions are put forward.

  3. Correlation between safety climate and contractor safety assessment programs in construction.

    PubMed

    Sparer, Emily H; Murphy, Lauren A; Taylor, Kathryn M; Dennerlein, Jack T

    2013-12-01

    Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Four hundred and one construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers' safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. Am. J. Ind. Med. 56:1463-1472, 2013. © 2013 Wiley Periodicals, Inc. © 2013 Wiley Periodicals, Inc.

  4. Governing the healthy male citizen: men, masculinity and popular health in Men's Health magazine.

    PubMed

    Crawshaw, Paul

    2007-10-01

    Recent commentators have noted the potential of newer neo-liberal discourses of health care to position responsibility for the management of well-being with the individual. Often promoted through the inculcation of risk avoidance and management, such discourses are played out in myriad settings, including the popular media. Magazines are one such media site in which diverse exhortations for the achievement of health, well-being and the perfectible body are made, and Bunton [1997. Popular health, advanced liberalism and good housekeeping magazine. In A. Petersen & Bunton R. (Eds.) Foucault, health and medicine (pp. 223-247). London: Routledge] has identified 'magazine medicine' as a significant manifestation of more dedifferentiated models of health care. Recent discussions have placed men's health high on research and policy agendas, with a concomitant interest in more popular realms. The UK magazine Men's Health (MH) is indicative of these trends, and represents a site at which discourses of men, health and masculinity are constructed. Typically reflecting neo-liberal models of health, here men are constructed as active and entrepreneurial citizens able to maintain their own health and well-being through the judicious management of risk in contexts appropriate to dominant discourses of hegemonic masculinity. Data which resulted from a critical discourse analysis of a 2-year sample (21 issues) of MH are considered and findings related to medicalisation, individualisation and risk discussed. It is suggested that magazine texts such as MH reflect newer individualised models of health care and neo-liberal strategies of health governance premised upon constructing a healthy male citizen, willing and able to take responsibility for their own well-being.

  5. Developments in life cycle assessment applied to evaluate the environmental performance of construction and demolition wastes.

    PubMed

    Bovea, M D; Powell, J C

    2016-04-01

    This paper provides a review of the literature that applies the life cycle assessment (LCA) methodology to the assessment of the environmental performance of the life cycle of construction and demolition waste (CDW) management systems. This article is focused on generating a general mapping of the literature and on identifying the best practices in compliance with LCA framework and proposing directions for future LCA studies in this field. The temporal evolution of the research in this field and the aim of the studies have grown in parallel with the legal framework related to waste and energy efficiency of buildings. Most studies have been published in Europe, followed by USA. Asia and Australia, being at an incipient application stage to the rest of the world. Topics related to "LCA of buildings, including their EoL" and "LCA of general CDW management strategies" are the most frequently analysed, followed by "LCA of EoL of construction elements" and "LCA of natural material vs recycled material". Regarding the strategies, recycling off-site and incineration, both combined with landfill for the rejected fractions, are the most commonly applied. Re-use or recycling on-site is the strategy least applied. The key aspect when LCA is applied to evaluate CDW management systems is the need to normalise which processes to include in the system boundary and the functional unit, the use of inventory data adapted to the context of the case study and the definition of a common set of appropriate impact assessment categories. Also, it is important to obtain results disaggregated by unit processes. This will allow the comparison between case studies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Abundance and sexual size dimorphism of the giant gartersnake (Thamnophis gigas) in the Sacramento valley of California

    USGS Publications Warehouse

    Wylie, G.D.; Casazza, Michael L.; Gregory, C.J.; Halstead, B.J.

    2010-01-01

    The Giant Gartersnake (Thamnophis gigas) is restricted to wetlands of the Central Valley of California. Because of wetland loss in this region, the Giant Gartersnake is both federally and state listed as threatened. We conducted markrecapture studies of four populations of the Giant Gartersnake in the Sacramento Valley (northern Central Valley), California, to obtain baseline data on abundance and density to assist in recovery planning for this species. We sampled habitats that ranged from natural, unmanaged marsh to constructed managed marshes and habitats associated with rice agriculture. Giant Gartersnake density in a natural wetland (1.90 individuals/ha) was an order of magnitude greater than in a managed wetland subject to active season drying (0.17 individuals/ha). Sex ratios at all sites were not different from 1 1, and females were longer and heavier than males. Females had greater body condition than males, and individuals at the least disturbed sites had significantly greater body condition than individuals at the managed wetland. The few remaining natural wetlands in the Central Valley are important, productive habitat for the Giant Gartersnake, and should be conserved and protected. Wetlands constructed and restored for the Giant Gartersnake should be modeled after the permanent, shallow wetlands representative of historic Giant Gartersnake habitat. ?? 2010 Society for the Study of Amphibians and Reptiles.

  7. Historic fire regimes of eastern Great Basin (USA) mountains reconstructed from tree rings

    Treesearch

    Stanley G. Kitchen

    2010-01-01

    Management of natural landscapes requires knowledge of key disturbance processes and their effects. Fire and forest histories provide valuable insight into how fire and vegetation varied and interacted in the past. I constructed multi-century fire chronologies for 10 sites on six mountain ranges representative of the eastern Great Basin (USA), a region in which...

  8. NOA at the Calaveras Dam Replacement Project (CDRP) - Challenges and Solutions

    NASA Astrophysics Data System (ADS)

    Erskine, B.

    2012-12-01

    The San Francisco Public Utilities Commission is one year into construction of the Calaveras Dam Replacement Project (CDRP), a new earthen dam east of Sunol designed to withstand an M 7.1 earthquake on the nearby active Calaveras fault. The zoned earthen dam will be constructed primarily of on-site materials, many of which contain NOA. The upstream shell will be composed of Franciscan complex blueschist which contains crocidolite. This material will be blasted and processed at an on-site quarry. The impermeable core of the dam will be constructed of clay-rich alluvium that contains asbestos derived from Franciscan rocks. This material will be excavated from the south end of the reservoir and transported several miles to the dam. Currently, approximately 3 million yards of Franciscan complex material is being excavated and disposed of within permitted on-site engineered landfills. NOA-bearing rocks that include serpentinite, greenschist, blueschist, and eclogite contain variable amounts and assemblages of chrysotile, actinolite, crocidolite, tremolite, and winchite-class amphiboles. All of these are detected in air samples collected within a sophisticated air monitoring array and analyzed by TEM. The CDRP represents the largest construction project involving NOA in the country. As such, applying regulations that were designed for building materials and routine construction sites, and controlling airborne emissions on such a massive scale, is a major challenge requiring innovative solutions. Because construction occurs simultaneously at distinct and distant parts of the site, and the rugged topography of the site induces complex meteorological conditions, it is sometimes difficult to ascertain the driving activity and location of a source that caused a trigger level exceedance at a perimeter monitoring station. One helpful tool is forensic correlation of source material and air test data using speciation of amphiboles. At the CDRP, we are developing the ability to correlate rock mineralogy at a location with the species of amphiboles identified on air samples using TEM. Using amphibole species as a fingerprinting tool, we have been successful in determining whether an exceedance of a trigger level was caused from onsite or offsite sources. In one case, multiple exceedances by an unusual mix of chrysotile and amphiboles (crocidolite, actinolite, tremolite, and Libby-class amphiboles in the same sample) narrowed the source to one of two locations: Disposal Site 3 where a mix of materials from the entire site is disposed of, and water recycled in the decontamination zone wheel wash equipment. Using perimeter air monitoring around and between each location it was possible to identify the wheel wash as the source. As a result, the wheel wash system, track out procedures, and road wetting protocol have been re-engineered to eliminate the potential for significant offsite emissions. These and other examples will describe how the SFPUC NOA team is managing the field determination of NOA, on-site control measures, and perimeter air monitoring to assure that construction is conducted in a safe manner and no offsite exposures to the public occur.

  9. 10 CFR 36.15 - Start of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...

  10. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  11. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Echelard

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  12. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  13. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  14. Effects of open marsh water management on numbers of larval salt marsh mosquitoes

    USGS Publications Warehouse

    James-Pirri, Mary-Jane; Ginsberg, Howard S.; Erwin, R. Michael; Taylor, Janith

    2009-01-01

    Open marsh water management (OMWM) is a commonly used approach to manage salt marsh mosquitoes than can obviate the need for pesticide application and at the same time, partially restore natural functions of grid-ditched marshes. OMWM includes a variety of hydrologic manipulations, often tailored to the specific conditions on individual marshes, so the overall effectiveness of this approach is difficult to assess. Here, we report the results of controlled field trials to assess the effects of two approaches to OMWM on larval mosquito production at National Wildlife Refuges (NWR). A traditional OMWM approach, using pond construction and radial ditches was used at Edwin B. Forsythe NWR in New Jersey, and a ditch-plugging approach was used at Parker River NWR in Massachusetts. Mosquito larvae were sampled from randomly placed stations on paired treatment and control marshes at each refuge. The proportion of sampling stations that were wet declined after OMWM at the Forsythe site, but not at the Parker River site. The proportion of samples with larvae present and mean larval densities, declined significantly at the treatment sites on both refuges relative to the control marshes. Percentage of control for the 2 yr posttreatment, compared with the 2 yr pretreatment, was >90% at both treatment sites.

  15. Ecological Monitoring and Compliance Program 2008 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Dennis J.; Anderson, David C.; Hall, Derek B.

    2009-04-30

    The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring ofmore » the Nonproliferation Test and Evaluation Complex (NPTEC).« less

  16. Resilience landscapes for Congo basin rainforests vs. climate and management impacts

    NASA Astrophysics Data System (ADS)

    Pietsch, Stephan Alexander; Gautam, Sishir; Elias Bednar, Johannes; Stanzl, Patrick; Mosnier, Aline; Obersteiner, Michael

    2015-04-01

    Past climate change caused severe disturbances of the Central African rainforest belt, with forest fragmentation and re-expansion due to drier and wetter climate conditions. Besides climate, human induced forest degradation affected biodiversity, structure and carbon storage of Congo basin rainforests. Information on climatically stable, mature rainforest, unaffected by human induced disturbances, provides means of assessing the impact of forest degradation and may serve as benchmarks of carbon carrying capacity over regions with similar site and climate conditions. BioGeoChemical (BGC) ecosystem models explicitly consider the impacts of site and climate conditions and may assess benchmark levels over regions devoid of undisturbed conditions. We will present a BGC-model validation for the Western Congolian Lowland Rainforest (WCLRF) using field data from a recently confirmed forest refuge, show model - data comparisons for disturbed und undisturbed forests under different site and climate conditions as well as for sites with repeated assessment of biodiversity and standing biomass during recovery from intensive exploitation. We will present climatic thresholds for WCLRF stability, and construct resilience landscapes for current day conditions vs. climate and management impacts.

  17. Transport and Sources of Suspended Sediment in the Mill Creek Watershed, Johnson County, Northeast Kansas, 2006-07

    USGS Publications Warehouse

    Lee, Casey J.; Rasmussen, Patrick P.; Ziegler, Andrew C.; Fuller, Christopher C.

    2009-01-01

    The U.S. Geological Survey, in cooperation with the Johnson County Stormwater Management Program, evaluated suspended-sediment transport and sources in the urbanizing, 57.4 mi2 Mill Creek watershed from February 2006 through June 2007. Sediment transport and sources were assessed spatially by continuous monitoring of streamflow and turbidity as well as sampling of suspended sediment at nine sites in the watershed. Within Mill Creek subwatersheds (2.8-16.9 mi2), sediment loads at sites downstream from increased construction activity were substantially larger (per unit area) than those at sites downstream from mature urban areas or less-developed watersheds. Sediment transport downstream from construction sites primarily was limited by transport capacity (streamflow), whereas availability of sediment supplies primarily influenced transport downstream from mature urban areas. Downstream sampling sites typically had smaller sediment loads (per unit area) than headwater sites, likely because of sediment deposition in larger, less sloping stream channels. Among similarly sized storms, those with increased precipitation intensity transported more sediment at eight of the nine monitoring sites. Storms following periods of increased sediment loading transported less sediment at two of the nine monitoring sites. In addition to monitoring performed in the Mill Creek watershed, sediment loads were computed for the four other largest watersheds (48.6-65.7 mi2) in Johnson County (Blue River, Cedar, Indian, and Kill Creeks) during the study period. In contrast with results from smaller watersheds in Mill Creek, sediment load (per unit area) from the most urbanized watershed in Johnson County (Indian Creek) was more than double that of other large watersheds. Potential sources of this sediment include legacy sediment from earlier urban construction, accelerated stream-channel erosion, or erosion from specific construction sites, such as stream-channel disturbance during bridge renovation. The implication of this finding is that sediment yields from larger watersheds may remain elevated after the majority of urban development is complete. Surface soil, channel-bank, suspended-sediment, and streambed-sediment samples were analyzed for grain size, nutrients, trace elements, and radionuclides in the Mill Creek watershed to characterize suspended sediment between surface or channel-bank sources. Although concentrations and activities of cobalt, nitrogen, selenium, total organic carbon, cesium-137, and excess lead-210 had significant differences between surface and channel-bank samples, biases resulting from urban construction, additional sorption of constituents during sediment transport, and inability to accurately represent erosion from rills and gullies precluded accurate characterization of suspended-sediment source.

  18. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Tammy Kelly, in the center, site manager, with Southeast Cherokee Construction Inc. talks with construction workers. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  19. Managing the nation`s nuclear waste. Site descriptions: Cypress Creek, Davis Canyon, Deaf Smith, Hanford Reference, Lavender Canyon, Richton Dome, Swisher, Vacherie Dome, and Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1985-12-31

    In 1982, the Congress enacted the Nuclear Waste Policy Act (Public Law 97-425), which established a comprehensive national program directed toward siting, constructing, and operating geologic repositories for the permanent disposal of high-level radioactive waste. In February 1983, the United States Department of Energy (DOE) identified the nine referenced repository locations as potentially acceptable sites for a mined geologic repository. These sites have been evaluated in accordance with the DOE`s General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. The DOE findings and determinations are based on the evaluations contained in the draft Environmental Assessments (EA). A finalmore » EA will be prepared after considering the comments received on the draft EA. The purpose of this document is to provide the public with specific site information on each potential repository location.« less

  20. Correlation of causal factors that influence construction safety performance: A model.

    PubMed

    Rodrigues, F; Coutinho, A; Cardoso, C

    2015-01-01

    The construction sector has presented positive development regarding the decrease in occupational accident rates in recent years. Regardless, the construction sector stands out systematically from other industries due to its high number of fatalities. The aim of this paper is to deeply understand the causality of construction accidents from the early design phase through a model. This study reviewed several research papers presenting various analytical models that correlate the contributing factors to occupational accidents in this sector. This study also analysed different construction projects and conducted a survey of design and site supervision teams. This paper proposes a model developed from the analysis of existing ones, which correlates the causal factors through all the construction phases. It was concluded that effective risk prevention can only be achieved by a global correlation of causal factors including not only production ones but also client requirements, financial climate, design team competence, project and risk management, financial capacity, health and safety policy and early planning. Accordingly, a model is proposed.

  1. Maximizing Conservation and Production with Intensive Forest Management: It's All About Location

    NASA Astrophysics Data System (ADS)

    Tittler, Rebecca; Filotas, Élise; Kroese, Jasmin; Messier, Christian

    2015-11-01

    Functional zoning has been suggested as a way to balance the needs of a viable forest industry with those of healthy ecosystems. Under this system, part of the forest is set aside for protected areas, counterbalanced by intensive and extensive management of the rest of the forest. Studies indicate this may provide adequate timber while minimizing road construction and favoring the development of large mature and old stands. However, it is unclear how the spatial arrangement of intensive management areas may affect the success of this zoning. Should these areas be agglomerated or dispersed throughout the forest landscape? Should managers prioritize (a) proximity to existing roads, (b) distance from protected areas, or (c) site-specific productivity? We use a spatially explicit landscape simulation model to examine the effects of different spatial scenarios on landscape structure, connectivity for native forest wildlife, stand diversity, harvest volume, and road construction: (1) random placement of intensive management areas, and (2-8) all possible combinations of rules (a)-(c). Results favor the agglomeration of intensive management areas. For most wildlife species, connectivity was the highest when intensive management was far from the protected areas. This scenario also resulted in relatively high harvest volumes. Maximizing distance of intensive management areas from protected areas may therefore be the best way to maximize the benefits of intensive management areas while minimizing their potentially negative effects on forest structure and biodiversity.

  2. Multidisciplinary study on anthropogenic landslides in Nepal

    NASA Astrophysics Data System (ADS)

    Puglia, Christopher; Derron, Marc-Henri; Nicolet, Pierrick; Sudmeier-Rieux, Karen; Jaboyedoff, Michel; Devkota, Sanjay

    2013-04-01

    Nepal is a country in which shallow landslide is a frequent phenomenon. Monsoon is the main triggering factor but anthropogenic influence is often significant too. Indeed, many infrastructures, such as roads or water pipes, are not built in a rigorous way because of a lack of funds and knowledge. In the present study we examine the technical, social and economic issues of landslide management for two sites in Nepal. The first site is located in Sanusiruwari VDC (Sindhupalchock district, central Nepal) and the second one in Namadi VDC (Ramecchap district, central Nepal). Both sites are affected by landslides induced by the construction of hydropower plants. These landslides may threaten the viability of the hydropower plants. At both sites the problems are quite similar, but the first site project is a private one and the second one is a public one implemented by the United Nations Development Programme (UNDP). For both sites, bioengineering methods using Vetiver (Vetyveria zizanioides) plantations is the main stabilization measure. To follow the progression of both landslides, fieldwork observations were conducted before and after the 2012 rainy season, including photogrammetric and distancemeter acquisitions. Main issues were discussed with communities and stakeholders of the hydropower projects through interviews and participatory risk mapping. Main issues include: lack of communication between the project managers and communities leading to conflict and the lack of maintenance of the bio-engineering sites, leading to less effective Vetiver growth and slope stabilization. Comparing the landslide management (technical, social and economic) of the two projects allows to point out some specific issues within an integrated risk perspective.

  3. Health risk reduction behaviors model for scavengers exposed to solid waste in municipal dump sites in Nakhon Ratchasima Province, Thailand

    PubMed Central

    Thirarattanasunthon, Phiman; Siriwong, Wattasit; Robson, Mark; Borjan, Marija

    2012-01-01

    The aim of this study was to evaluate the effect of comprehensive health risk protection behaviors, knowledge, attitudes, and practices among scavengers in open dump sites. A control group of 44 scavengers and an intervention group of 44 scavengers participated in this study. Interventions included the use of personal protective equipment, health protection training, and other measures. The analysis showed significant differences before and after the intervention program and also between the control and intervention groups. These observations suggest that further action should be taken to reduce adverse exposure during waste collection. To reduce health hazards to workers, dump site scavenging should be incorporated into the formal sector program. Solid waste and the management of municipal solid waste has become a human and environmental health issue and future research should look at constructing a sustainable model to help protect the health of scavengers and drive authorities to adopt safer management techniques. PMID:22969307

  4. Management of Disused Radioactive Sealed Sources in the Slovak Republic - 12100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzer, Peter

    2012-07-01

    After splitting-up the Czechoslovak Federation in 1993, the system of management of institutional radioactive waste, where disused sources represent its significant part, had had to build from beginning, since all corresponding activities had remained in the Czech part of the Federation. The paper presents the development of legislative and institutional framework of the disused radioactive sealed source management, development of the national inventory and development of management practices. According the Governmental decision (1994), the management of disused sealed sources and institutional radioactive waste at whole was based on maximal utilization of facilities inside nuclear facilities, particularly in the NPP A1more » (shut down in the past, currently under decommissioning). This approach has been recently changing by Governmental decision (2009) to construct 'non-nuclear facility' - central storage for remained disused sealed sources collected from the places of use, where they were stored in some cases for tens of years. The approaches to siting and construction of this storage facility will be presented, as well as the current approaches to solution of the disused radioactive sources final disposal. Environmental impact assessment process in regard to the given facility/activity is slowly drawing to a close. The final statement of the Ministry of Environment can be expected in January or February 2012, probably recommending option 1 as preferred [6]. According to the Slovak legislation, the final statement has a status of recommendation for ongoing processes leading to the siting license. Very recently, in December 2012, Government of the Slovak republic decided to postpone putting the facility into operation by the end of June, 2014. (author)« less

  5. Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil.

    PubMed

    Penteado, Carmenlucia Santos Giordano; Rosado, Laís Peixoto

    2016-10-01

    Brazil, as a result of economic development and strengthening of the construction industry in recent years, is generating an increasing amount of construction and demolition waste (CDW). Hence, environmental assessment of the management systems is vital. A life cycle assessment (LCA) is presented of CDW management in a medium-sized municipality located in the southeast region of Brazil, where the impacts of leaching were not considered due to absence of consistent data. Six different proposed scenarios for the current CDW management situation have been considered. These scenarios comprised the combined use of landfilling, sorting, and recycling, and the use of CDW as paving material for landfill roads, in different percentages. Considering 0.8 ton of waste as the functional unit, the life cycle inventory was performed using primary data obtained from field survey and secondary data from the database Ecoinvent version 3.1, and from the literature. The method CML 2 baseline 2001 was used for environmental impacts evaluation. The results highlight that recycling is beneficial when efficient CDW sorting takes place at construction sites, avoiding the transport of refuse to sorting and recycling facilities, and the distance between the generation source and the recycling unit is within 30 km. Thus, our results are helpful to ensure that the decision-making processes are based on environmental and technical aspects, and not only on economic and political factors, and also provide data and support for other LCA studies on CDW. © The Author(s) 2016.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  7. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  8. Improved Gout Outcomes in Primary Care Using a Novel Disease Management Program: A Pilot Study.

    PubMed

    Bulbin, David; Denio, Alfred E; Berger, Andrea; Brown, Jason; Maynard, Carson; Sharma, Tarun; Kirchner, H Lester; Ayoub, William T

    2018-02-13

    To pilot a primary care gout management improvement intervention. Two large primary care sites were selected: one underwent the intervention, the other, a control, underwent no intervention. The intervention consisted of: engagement of intervention site staff, surveys of provider performance improvement preferences, and onsite live and enduring online education. Electronic Health Record reminders were constructed. Both the intervention and control sites had 3 quality measures assessed monthly: percent of gout patients treated with urate lowering therapy, percent of treated patients monitored with serum urate, and percent of treated patients at target serum urate ≤ 6.0 mg/dl. The intervention site providers received monthly reports comparing their measures against their peers. By 6 months, the intervention site significantly improved all 3 gout performance measures. Percentage treated increased from 54.4 to 61.1%, OR 1.19 (95% CI 1.08, 1.31 and p-value <0.001); percentage monitored increased from 56.1 to 79.2% OR 1.52 (95% CI 1.24, 1.87 and P-value <0.001); and percentage at goal increased from 26.8 to 43.3% OR 1.43 (95% CI 1.16, 1.77 and p-value <0.001. At 6 months after intervention, gout patients at the intervention site were more likely to be monitored (79.2% vs. 53.4%, OR 3.54 (95% CI: 2.30, 5.45 and p-value < 0.001)) and at goal (43.3% vs. 28.3%; OR 1.99 (95% CI: 1.33, 2.96 and p-value <0.001) than control site patients. Numbers treated did not significantly improve over the control site. A pilot multifaceted gout management program can significantly improve primary care gout management performance. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  9. Passive drainage and biofiltration of landfill gas: Australian field trial

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dever, S.A.; Swarbrick, G.E.; Stuetz, R.M.

    2007-07-01

    In Australia a significant number of landfill waste disposal sites do not incorporate measures for the collection and treatment of landfill gas. This includes many old/former landfill sites, rural landfill sites, non-putrescible solid waste and inert waste landfill sites, where landfill gas generation is low and it is not commercially viable to extract and beneficially utilize the landfill gas. Previous research has demonstrated that biofiltration has the potential to degrade methane in landfill gas, however, the microbial processes can be affected by many local conditions and factors including moisture content, temperature, nutrient supply, including the availability of oxygen and methane,more » and the movement of gas (oxygen and methane) to/from the micro-organisms. A field scale trial is being undertaken at a landfill site in Sydney, Australia, to investigate passive drainage and biofiltration of landfill gas as a means of managing landfill gas emissions at low to moderate gas generation landfill sites. The design and construction of the trial is described and the experimental results will provide in-depth knowledge on the application of passive gas drainage and landfill gas biofiltration under Sydney (Australian) conditions, including the performance of recycled materials for the management of landfill gas emissions.« less

  10. The Beaver Creek story

    USGS Publications Warehouse

    Doyle, W.H.; Whitworth, B.G.; Smith, G.F.; Byl, T.D.

    1996-01-01

    Beaver Creek watershed in West Tennessee includes about 95,000 acres of the Nation's most productive farmland and most highly erodible soils. In 1989 the U.S. Geological Survey, in cooperation with the Tennessee Department of Agriculture, began a study to evaluate the effect of agricultural activities on water quality in the watershed and for best management practices designed to reduce agricultural nonpoint-source pollution. Agrichemical monitoring included testing the soils, ground water, and streams at four farm sites ranging from 27 to 420 acres. Monitoring stations were operated downstream to gain a better understanding of the water chemistry as runoff moved from small ditches into larger streams to the outlet of the Beaver Creek watershed. Prior to the implementation of best management practices at one of the farm study sites, some storms produced an average suspended-sediment concentration of 70,000 milligrams per liter. After the implementation of BMP's, however, the average value never exceeded 7,000 milligrams per liter. No-till crop production was the most effective best management practice for conserving soil on the farm fields tested. A natural bottomland hardwood wetland and a constructed wetland were evaluated as instream resource-management systems. The wetlands improved water quality downstream by acting as a filter and removing a significant amount of nonpoint-source pollution from the agricultural runoff. The constructed wetland reduced the sediment, pesticide, and nutrient load by approximately 50 percent over a 4-month period. The results of the Beaver Creek watershed study have increased the understanding of the effects of agriculture on water resources. Study results also demonstrated that BMP's do protect and improve water quality.

  11. Federal environmental standards of potential importance to operations and activities at US Department of Energy sites. Draft

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, K.M.; Bilyard, G.R.; Davidson, S.A.

    1993-06-01

    The US Department of Energy (DOE) is now engaged in a program of environmental restoration nationwide across its 45 sites. It is also bringing its facilities into compliance with environmental regulations, decontaminating and decommissioning unwanted facilities, and constructing new waste management facilities. One of the most difficult questions that DOE must face in successfully remediating its inactive waste sites, decontaminating and decommissioning its inactive facilities, and operating its waste management facilities is: ``What criteria and standards should be met?`` Acceptable standards or procedures for determining standards will assist DOE in its conduct of ongoing waste management and pending cleanup activitiesmore » by helping to ensure that those activities are conducted in compliance with applicable laws and regulations and are accepted by the regulatory community and the public. This document reports on the second of three baseline activities that are being conducted as prerequisites to either the development of quantitative standards that could be used by DOE, or consistent procedures for developing such standards. The first and third baseline activities are also briefly discussed in conjunction with the second of the three activities.« less

  12. Success of intensive management of a critically imperiled population of red-cockaded woodpeckers in South Carolina

    Treesearch

    Kathleen E. Franzreb

    1997-01-01

    By late 1985, the population of Red-cockaded Woodpeckers (Picoider borealis) at the Savannah River Site, South Carolina, had declined to a low of four individuals. Because of extensive timber harvesting prior to thr 1950s,the older live pine trees that Red-cockaded Woodpeckers require for cavity construction were limited. We monitored the response of the population to...

  13. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    DOT National Transportation Integrated Search

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  14. KSC-2011-1154

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  15. KSC-2011-1155

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  16. California Dept. of Toxic Substances Control (DTSC) Update of the Schools Naturally Occurring Asbestos Guidance

    NASA Astrophysics Data System (ADS)

    Malinowski, M.

    2012-12-01

    Prior to acquisition and/or construction of prospective school sites, the California Education Code mandates that school districts complete environmental assessments and cleanups for prospective new or expanding school sites in order to qualify for state funding. If prospective school sites are determined to have environmental contamination from hazardous materials, including naturally occurring hazardous materials such as naturally occurring asbestos (NOA), where there may be unacceptable potential health risks, the school sites must be properly mitigated prior to occupancy for protection of human health and the environment. NOA is of special concern for schools, because children who are exposed to asbestos may be at increased risk of developing asbestos-related diseases over time. In order to protect human health, the Department of Toxic Substances Control's (DTSC) goals at school sites are to: 1) identify the presence of NOA in school site soils using exposure-reducing soil thresholds; 2) manage potential NOA exposures using mitigation measures to reduce generation of airborne asbestos fibers from soils on school sites; and 3) ensure long-term monitoring and protection of mitigation measures via Operations & Maintenance activities. DTSC is currently in the process of revising its Interim Guidance Naturally Occurring Asbestos (NOA) at School Sites - September 2004. The revisions include: 1) updating the guidance to consider incremental sampling for use at NOA sites in consultation with DTSC's project manager and technical staff, and 2) documenting a tiered approach to addressing high and low activity areas on a school.

  17. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodatemore » the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.« less

  18. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    NASA Astrophysics Data System (ADS)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  19. Upscaling the pollutant emission from mixed recycled aggregates under compaction for civil applications.

    PubMed

    Galvín, Adela P; Ayuso, Jesús; Barbudo, Auxi; Cabrera, Manuel; López-Uceda, Antonio; Rosales, Julia

    2017-12-27

    In general terms, plant managers of sites producing construction wastes assess materials according to concise, legally recommended leaching tests that do not consider the compaction stage of the materials when they are applied on-site. Thus, the tests do not account for the real on-site physical conditions of the recycled aggregates used in civil works (e.g., roads or embankments). This leads to errors in estimating the pollutant potential of these materials. For that reason, in the present research, an experimental procedure is designed as a leaching test for construction materials under compaction. The aim of this laboratory test (designed specifically for the granular materials used in civil engineering infrastructures) is to evaluate the release of pollutant elements when the recycled aggregate is tested at its commercial grain-size distribution and when the material is compacted under on-site conditions. Two recycled aggregates with different gypsum contents (0.95 and 2.57%) were used in this study. In addition to the designed leaching laboratory test, the conventional compliance leaching test and the Dutch percolation test were performed. The results of the new leaching method were compared with the conventional leaching test results. After analysis, the chromium and sulphate levels obtained from the newly designed test were lower than those obtained from the conventional leaching test, and these were considered more seriously pollutant elements. This result confirms that when the leaching behaviour is evaluated for construction aggregates without density alteration, crushing the aggregate and using only the finest fraction, as is done in the conventional test (which is an unrealistic situation for aggregates that are applied under on-site conditions), the leaching behaviour is not accurately assessed.

  20. 10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... average megawatts or more over a 12 month period. This applies to power marketing operations and to siting... Systems D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities D3. Siting/construction/operation/decommissioning of uranium enrichment facilities D4. Siting/construction...

  1. Applications of turbidity monitoring to forest management in California.

    PubMed

    Harris, Richard R; Sullivan, Kathleen; Cafferata, Peter H; Munn, John R; Faucher, Kevin M

    2007-09-01

    Many California streams have been adversely affected by sedimentation caused by historic and current land uses, including timber harvesting. The impacts of timber harvesting and logging transportation systems on erosion and sediment delivery can be directly measured, modeled, or inferred from water quality measurements. California regulatory agencies, researchers, and land owners have adopted turbidity monitoring to determine effects of forest management practices on suspended sediment loads and water quality at watershed, project, and site scales. Watershed-scale trends in sediment discharge and responses to current forest practices may be estimated from data collected at automated sampling stations that measure turbidity, stream flow, suspended sediment concentrations, and other water quality parameters. Future results from these studies will provide a basis for assessing the effectiveness of modern forest practice regulations in protecting water quality. At the project scale, manual sampling of water column turbidity during high stream flow events within and downstream from active timber harvest plans can identify emerging sediment sources. Remedial actions can then be taken by managers to prevent or mitigate water quality impacts. At the site scale, manual turbidity sampling during storms or high stream flow events at sites located upstream and downstream from new, upgraded, or decommissioned stream crossings has proven to be a valuable way to determine whether measures taken to prevent post-construction erosion and sediment production are effective. Turbidity monitoring at the project and site scales is therefore an important tool for adaptive management. Uncertainty regarding the effects of current forest practices must be resolved through watershed-scale experiments. In the short term, this uncertainty will stimulate increased use of project and site-scale monitoring.

  2. Wind Energy and Wildlife Pre- and Post-Construction Project at Pantex Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matlack, Raymond S.

    From 2009-2017, we conducted pre- and post-construction monitoring of wildlife at the Pantex Plant before and after construction of five wind turbines on the plant in 2014-2015. Pre-construction acoustic monitoring for bats was conducted at five sites on Pantex. Acoustic (here after Anabat) files were downloaded 30 times with Anabat files recorded from 6/21/2010 through 1/17/2014. The resulting data include over 3,000,000 files and we hope to analyze them in the future. We were never successful recording acoustic data after 2014 (post-construction). This is despite numerous attempts to trouble shoot our acoustic monitors. Wind damage to cables going from themore » body of the monitor to their microphones could not be repaired or replaced while towers were standing. Sampling of breeding birds was accomplished through point counts conducted at sites selected for turbine construction and others selected as control sites. Precipitation varied greatly over the course of the study, from a low of 17.81 cm (7.01 inches) during 2011 to a high of 87.96 cm (34.63 inches) during 2015. The pre-construction portion of the project was characterized by fairly extreme drought starting in 2011. Total precipitation for 2011 and 2012 was just 49.12 cm (19.34 inches), less than 50% of the average for a two-year period. The impact of this drought on nesting grassland birds manifest as low nesting species richness and abundance. In 2011 and 2012, 20 and 17 species were documented during point counts, respectively. Post-construction sampling followed the wet year of 2015 (87.96 cm, 34.63 inches). Species richness of nesting birds in 2016 and 2017 was considerably higher than during the drought, 40 and 37 species, respectively. We suspect changes in resource availability associated with relief from drought starting after 2015 was responsible for the recovery/increase in species detected during the breeding season; less importantly any changes from installation of turbines or changes in surface management (e.g., row-crop type).« less

  3. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...

  4. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  5. Priority and construction sites of water storage in a watershed in response to climate change

    NASA Astrophysics Data System (ADS)

    Lin, Cheng-Yu; Zhang, Wen-Yan; Lin, Chao-Yuan

    2014-05-01

    Taiwan is located at the Eastern Asia Monsoon climate zone. Typhoons and/or convectional rains occur frequently and result in high intensity storms in the summer season. Once the detention facilities are shortage or soil infiltration rate become worse in a watershed due to land use, surface runoff is easily to concentrate and threaten the protected areas. Therefore, it is very important to examine the functionality of water storage for a watershed. The purpose of this study is to solve the issue of flooding in the Puzi Creek. A case study of Yizen Bridge Watershed, in which the SCS curve number was used as an index to extract the spatial distribution of the strength of water storage, and the value of watershed mean CN along the main channel was calculated using area-weighting method. Therefore, the hotspot management sites were then derived and the priority method was applied to screen the depression sites for the reference of management authorities in detention ponds placement. The results show that the areas of subzone A with the characteristics of bad condition in topography and soil, which results in poor infiltration. However, the areas are mostly covered with forest and are difficult to create the artificial water storage facilities. Detention dams are strongly recommended at the site of depression in the river channel to decrease discharge velocity and reduce impact from flood disaster. The areas of subzone B are mainly located at the agriculture slope land. The topographic depressions in the farmland are the suitable places to construct the farm ponds for the use of flood detention and sediment deposition in the rainy seasons and irrigation in the dry seasons. Areas of subzone C are mainly occupied the gentle slope land with a better ability in water storage due to low CN value. Farm ponds constructed in the riparian to bypass the nearby river channel can create multifunctional wetland to effectively decrease the peak discharge in the downstream during storm events. Depression storages are based on additional runoff obtained from CN calculation. Strategies mentioned in this study can be provided as references of climate change adaptions for related authorities.

  6. Study on HOPE Management Mode of Coal Enterprises Based on Systematic Thinking

    NASA Astrophysics Data System (ADS)

    Zhaoran, Zhang; Tianzhu, Zhang; Wenjing, Tong

    2018-02-01

    The extensive management mode of coal enterprises is no longer applicable to the demand of enterprise development under the new economic situation. Combined with the characteristics of coal mine production, based on the system of thinking, integration of lean, people, comprehensive, job management theory, formed HOPE management model, including a core system and three support systems and 18 elements. There are three stages in the development and implementation of this model. To 6S site management for the initial stage to job process reengineering for the intermediate stage to post value process control for the advanced stage. The successful implementation of HOPE model in coal enterprises needs comprehensive control from five aspects: lean culture construction, flattening organizational structure, cost control system, performance appraisal system and lean information management platform. HOPE model can be implemented smoothly and make “win-win” between enterprises and employees.

  7. Optimizing and controlling earthmoving operations using spatial technologies

    NASA Astrophysics Data System (ADS)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.

  8. Engineering Technical Support Center Annual Report Fiscal ...

    EPA Pesticide Factsheets

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  9. Characterizing the environmental impact of metals in construction and demolition waste.

    PubMed

    Yu, Danfeng; Duan, Huabo; Song, Qingbin; Li, Xiaoyue; Zhang, Hao; Zhang, Hui; Liu, Yicheng; Shen, Weijun; Wang, Jinben

    2018-05-01

    Large quantities of construction and demolition (C&D) waste are generated in China every year, but their potential environmental impacts on the surrounding areas are rarely assessed. This study focuses on metals contained in C&D waste, characterizing the metal concentrations and their related environmental risks. C&D waste samples were collected in Shenzhen City, China, from building demolition sites, renovation areas undergoing refurbishment, landfill sites, and recycling companies (all located in Shenzhen city) that produce recycled aggregate, in order to identify pollution levels of the metals As, Cd, Cr, Cu, Pb, Ni, and Zn. The results showed that (1) the metal concentrations in most demolition and renovation waste samples were below the soil environmental quality standard for agricultural purposes (SQ-Agr.) in China; (2) Cd, Cu, and Zn led to relatively higher environmental risks than other metals, especially for Zn (DM5 tile sample, 360 mg/kg; R4 tile sample, 281 mg/kg); (3) non-inert C&D waste such as wall insulation and foamed plastic had high concentrations of As and Cd, so that these materials required special attention for sound waste management; and (4) C&D waste collected from landfill sites had higher concentrations of Cd and Cu than did waste collected from demolition and refurbishment sites.

  10. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

    PubMed

    Jaillon, L; Poon, C S; Chiang, Y H

    2009-01-01

    As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

  11. Human Factors Simulation in Construction Management Education

    ERIC Educational Resources Information Center

    Jaeger, M.; Adair, D.

    2010-01-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maurer, D.

    In January 1986, the Becon Construction Company - an open-shop contractor based in Houston, Texas - mobilized a work force to a construction project location at the Belridge Oil Field, near Bakersfield, California. The construction craftsmen and helpers in Becon's work force were expected to improve their level of productivity as the work proceeded because of the knowledge and skills that they would acquire as a result of the repetitive nature of the work. As it was originally organized, the Becon HOTS project represented almost a pure laboratory environment in which to collect data concerning the learning effect on workermore » productivity as well as to statistically isolate the impact on productivity of such external factors as weather, absenteeism, turnover, and especially work methods improvement techniques and pay incentives. From the outset of the HOTS project, the project manager had established an accurate system to quantitatively measure and compare the total manhours that each crew - civil, mechanical, electrical, and prefabrication -- performed at individual HOTS construction locations. Additionally, it was initially assumed that the project manager would be relatively free to implement changes to the job site conditions involving incentive pay and work methods improvement. The subsequent effect of these changes on the productivity of separate work crews could then be evaluated in terms of measured manhours per crew per HOTS.« less

  13. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  14. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  15. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  16. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  17. Investigating Uncertainty and Sensitivity in Integrated, Multimedia Environmental Models: Tools for FRAMES-3MRA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Babendreier, Justin E.; Castleton, Karl J.

    2005-08-01

    Elucidating uncertainty and sensitivity structures in environmental models can be a difficult task, even for low-order, single-medium constructs driven by a unique set of site-specific data. Quantitative assessment of integrated, multimedia models that simulate hundreds of sites, spanning multiple geographical and ecological regions, will ultimately require a comparative approach using several techniques, coupled with sufficient computational power. The Framework for Risk Analysis in Multimedia Environmental Systems - Multimedia, Multipathway, and Multireceptor Risk Assessment (FRAMES-3MRA) is an important software model being developed by the United States Environmental Protection Agency for use in risk assessment of hazardous waste management facilities. The 3MRAmore » modeling system includes a set of 17 science modules that collectively simulate release, fate and transport, exposure, and risk associated with hazardous contaminants disposed of in land-based waste management units (WMU) .« less

  18. SAFETY AT FLUOR HANFORD (A) CASE STUDY - PREPARED BY THUNDERBIRD SCHOOL OF GLOBAL MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ARNOLD LD

    2009-09-25

    By November of 1997, Fluor Hanford (Fluor) had been the site manager of the Hanford nuclear reservation for a year. The Hanford site had been established as part of the Manhattan Project in the 1940s that gave birth to the atomic bomb. Hanford produced two thirds of U.S. plutonium during the Cold War period. The Hanford site was half the size of Rhode Island and occupied 586 square miles in southeastern Washington State. The production of plutonium for more than 40 years left a huge legacy of chemical and radiological contamination: 80 square miles of contaminated groundwater; 2,300 tons ofmore » spent nuclear fuel stored in underwater basins; 20 tons of plutonium-laced contaminated materials; and 500 contaminated facilities. The cleanup involved a challenging combination of radioactive material handling within an infrastructure constructed in the 1940s and 1950s. The cleanup that began in 1988 was expected to take 30 years or more. Improving safety at Hanford had already proven to be a significant challenge. As the new site manager at Hanford, Fluor Hanford inherited lower- and mid-level managers and thousands of unionized employees, many of whom were second or third generation Hanford employees. These employees had seen many contractors come and go over the years. Some of the managers who had worked with the previous contractor saw Fluor's emphasis on safety as getting in the way of operations. Union-management relations were fractious. Hanford's culture was described as 'production driven-management told everyone what to do, and, if you didn't do it, there were consequences'. Worker involvement in designing and implementing safety programs was negligible. Fluor Hanford also was having trouble satisfying its client, the Department of Energy (DOE). The DOE did not see a clear path forward for performance improvements at Hanford. Clearly, major change was necessary, but how and where should it be implemented?« less

  19. Landfill site selection using combination of GIS and fuzzy AHP, a case study: Iranshahr, Iran.

    PubMed

    Torabi-Kaveh, M; Babazadeh, R; Mohammadi, S D; Zaresefat, M

    2016-03-09

    One of the most important recent challenges in solid waste management throughout the world is site selection of sanitary landfill. Commonly, because of simultaneous effects of social, environmental, and technical parameters on suitability of a landfill site, landfill site selection is a complex process and depends on several criteria and regulations. This study develops a multi-criteria decision analysis (MCDA) process, which combines geographic information system (GIS) analysis with a fuzzy analytical hierarchy process (FAHP), to determine suitable sites for landfill construction in Iranshahr County, Iran. The GIS was used to calculate and classify selected criteria and FAHP was used to assess the criteria weights based on their effectiveness on selection of potential landfill sites. Finally, a suitability map was prepared by overlay analyses and suitable areas were identified. Four suitability classes within the study area were separated, including high, medium, low, and very low suitability areas, which represented 18%, 15%, 55%, and 12% of the study area, respectively. © The Author(s) 2016.

  20. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Planmore » for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.« less

  1. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) ismore » the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.« less

  2. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    DOT National Transportation Integrated Search

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  3. Building a pipeline of talent for operating radio observatories

    NASA Astrophysics Data System (ADS)

    Wingate, Lory M.

    2016-07-01

    The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  4. Current Status of the Nuclear Waste Management Programme in Finland - 13441

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehto, Kimmo; Vuorio, Petteri

    2013-07-01

    Pursuant to the Decision-in-Principle of 2001 the Finnish programme for geologic disposal of spent fuel has now moved to the phase of applying for construction licence to build up the encapsulation plant and underground repository. The main objective of former programme phase, underground characterisation phase, was to confirm - or refute - the suitability of the Olkiluoto site by investigations conducted underground at the actual depth of the repository. The construction work of the access tunnel to the rock characterisation facility (ONKALO) started in the late summer of 2004. The site research and investigations work aimed at the maturity neededmore » for submission of the application for construction license of the actual repository in end of 2012. This requires, however, that also the technology has reached the maturity needed. The design and technical plans form the necessary platform for the development of the safety case for spent fuel disposal. A plan, 'road map', has been produced for the portfolio of reports that demonstrates the safety of disposal as required by the criteria set by the government and further detailed by the safety authority, STUK. (authors)« less

  5. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  6. Water-Related Infrastructure in a Region of Post-Earthquake Haiti: High Levels of Fecal Contamination and Need for Ongoing Monitoring

    PubMed Central

    Widmer, Jocelyn M.; Weppelmann, Thomas A.; Alam, Meer T.; Morrissey, B. David; Redden, Edsel; Rashid, Mohammed H.; Diamond, Ulrica; Ali, Afsar; De Rochars, Madsen Beau; Blackburn, Jason K.; Johnson, Judith A.; Morris, J. Glenn

    2014-01-01

    We inventoried non-surface water sources in the Leogane and Gressier region of Haiti (approximately 270 km2) in 2012 and 2013 and screened water from 345 sites for fecal coliforms and Vibrio cholerae. An international organization/non-governmental organization responsible for construction could be identified for only 56% of water points evaluated. Sixteen percent of water points were non-functional at any given time; 37% had evidence of fecal contamination, with spatial clustering of contaminated sites. Among improved water sources (76% of sites), 24.6% had fecal coliforms versus 80.9% in unimproved sources. Fecal contamination levels increased significantly from 36% to 51% immediately after the passage of Tropical Storm Sandy in October of 2012, with a return to 34% contamination in March of 2013. Long-term sustainability of potable water delivery at a regional scale requires ongoing assessment of water quality, functionality, and development of community-based management schemes supported by a national plan for the management of potable water. PMID:25071005

  7. Water-related infrastructure in a region of post-earthquake Haiti: high levels of fecal contamination and need for ongoing monitoring.

    PubMed

    Widmer, Jocelyn M; Weppelmann, Thomas A; Alam, Meer T; Morrissey, B David; Redden, Edsel; Rashid, Mohammed H; Diamond, Ulrica; Ali, Afsar; De Rochars, Madsen Beau; Blackburn, Jason K; Johnson, Judith A; Morris, J Glenn

    2014-10-01

    We inventoried non-surface water sources in the Leogane and Gressier region of Haiti (approximately 270 km(2)) in 2012 and 2013 and screened water from 345 sites for fecal coliforms and Vibrio cholerae. An international organization/non-governmental organization responsible for construction could be identified for only 56% of water points evaluated. Sixteen percent of water points were non-functional at any given time; 37% had evidence of fecal contamination, with spatial clustering of contaminated sites. Among improved water sources (76% of sites), 24.6% had fecal coliforms versus 80.9% in unimproved sources. Fecal contamination levels increased significantly from 36% to 51% immediately after the passage of Tropical Storm Sandy in October of 2012, with a return to 34% contamination in March of 2013. Long-term sustainability of potable water delivery at a regional scale requires ongoing assessment of water quality, functionality, and development of community-based management schemes supported by a national plan for the management of potable water. © The American Society of Tropical Medicine and Hygiene.

  8. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  9. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  10. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  11. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  12. Ecological Monitoring and Compliance Program 2009 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, J. Dennis; Anderson, David C.; Hall, Derek B.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferationmore » Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  13. Towards the Enhancement of "MINOR" Archaeological Heritage

    NASA Astrophysics Data System (ADS)

    Morandi, S.; Tremari, M.; Mandelli, A.

    2017-02-01

    The research is an analysis of the recording, reconstruction and visualisation of the 3D data of a XVIII century watermill, identified in an emergency archaeological excavation during the construction of the mini-hydroelectric plant on the bank of the Adda river in the municipality of Pizzighettone (Cremona, Lombardy, Italy). The work examines the use and the potentials of modern digital 3D modelling techniques applied to archaeological heritage aimed to increase the research, maintenance and presentation with interactive products. The use of three-dimensional models managed through AR (Augmented Reality) and VR (Virtual Reality) technologies with mobile devices gives several opportunities in the field of study and communication. It also improves on-site exploration of the landscape, enhancing the "minor" archaeological sites, daily subjected to numerous emergency works and facilitating the understanding of heritage sites.

  14. Responses of salt marsh ecosystems to mosquito control management practices along the Atlantic Coast (U.S.A.)

    USGS Publications Warehouse

    James-Pirri, Mary-Jane; Erwin, R. Michael; Prosser, Diann J.; Taylor, Janith D.

    2012-01-01

    Open marsh water management (OMWM) of salt marshes modifies grid-ditched marshes by creating permanent ponds and radial ditches in the high marsh that reduce mosquito production and enhance fish predation on mosquitoes. It is preferable to using pesticides to control salt marsh mosquito production and is commonly presented as a restoration or habitat enhancement tool for grid-ditched salt marshes. Monitoring of nekton, vegetation, groundwater level, soil salinity, and bird communities before and after OMWM at 11 (six treatment and five reference sites) Atlantic Coast (U.S.A.) salt marshes revealed high variability within and among differing OMWM techniques (ditch-plugging, reengineering of sill ditches, and the creation of ponds and radial ditches). At three marshes, the dominant nekton shifted from fish (primarily Fundulidae species) to shrimp (Palaemonidae species) after manipulations and shrimp density increased at other treatment sites. Vegetation changed at only two sites, one with construction equipment impacts (not desired) and one with a decrease in woody vegetation along existing ditches (desired). One marsh had lower groundwater level and soil salinity, and bird use, although variable, was often unrelated to OMWM manipulations. The potential effects of OMWM manipulations on non-target salt marsh resources need to be carefully considered by resource planners when managing marshes for mosquito control.

  15. Telescopio San Pedro Mártir Observatory preliminary design and project approach

    NASA Astrophysics Data System (ADS)

    Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina

    2016-07-01

    The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.

  16. Approach to the E-ELT dome and main structure challenges

    NASA Astrophysics Data System (ADS)

    Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier

    2014-07-01

    The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the project and its special technical characteristics require specific managerial skills. Due to the size of the project it becomes essential to effectively manage and integrate a large number of suppliers and fabricators, of very different nature and geographically distributed. Project management plans need to cope with this situation. Also, extensive on site activities require intensive on site organization in line with large construction management strategies. Finally, the technical edge of the project requires deep technical understanding at management level in order to be able to take sound strategic decisions throughout the project in terms of the overall project quality, cost and schedule.

  17. Design of turbidity controls for Oklahoma highway construction.

    DOT National Transportation Integrated Search

    2013-03-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...

  18. Probability of illness definition for the Skylab flight crew health stabilization program

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Management and analysis of crew and environmental microbiological data from SMEAT and Skylab are discussed. Samples were collected from ten different body sites on each SMEAT and Skylab crew-member on approximately 50 occasions and since several different organisms could be isolated from each sample, several thousand lab reports were generated. These lab reports were coded and entered in a computer file and from the file various tabular summaries were constructed.

  19. A condition metric for Eucalyptus woodland derived from expert evaluations.

    PubMed

    Sinclair, Steve J; Bruce, Matthew J; Griffioen, Peter; Dodd, Amanda; White, Matthew D

    2018-02-01

    The evaluation of ecosystem quality is important for land-management and land-use planning. Evaluation is unavoidably subjective, and robust metrics must be based on consensus and the structured use of observations. We devised a transparent and repeatable process for building and testing ecosystem metrics based on expert data. We gathered quantitative evaluation data on the quality of hypothetical grassy woodland sites from experts. We used these data to train a model (an ensemble of 30 bagged regression trees) capable of predicting the perceived quality of similar hypothetical woodlands based on a set of 13 site variables as inputs (e.g., cover of shrubs, richness of native forbs). These variables can be measured at any site and the model implemented in a spreadsheet as a metric of woodland quality. We also investigated the number of experts required to produce an opinion data set sufficient for the construction of a metric. The model produced evaluations similar to those provided by experts, as shown by assessing the model's quality scores of expert-evaluated test sites not used to train the model. We applied the metric to 13 woodland conservation reserves and asked managers of these sites to independently evaluate their quality. To assess metric performance, we compared the model's evaluation of site quality with the managers' evaluations through multidimensional scaling. The metric performed relatively well, plotting close to the center of the space defined by the evaluators. Given the method provides data-driven consensus and repeatability, which no single human evaluator can provide, we suggest it is a valuable tool for evaluating ecosystem quality in real-world contexts. We believe our approach is applicable to any ecosystem. © 2017 State of Victoria.

  20. A science and technology initiative within the office of civilian radioactive waste management

    USGS Publications Warehouse

    Budnitz, R.J.; Kiess, T.E.; Peters, M.; Duncan, D.

    2003-01-01

    In 2002, by following a national decision-making process that had been specified in the 1982 Nuclear Waste Policy Act, Yucca Mountain (YM) was designated as the site for the nation's geologic repository for commercial spent nuclear fuel (SNF). The U.S. Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) must now obtain regulatory approval to construct and operate a repository there, and to develop transportation and infrastructure needed to support operations. The OCRWM has also recently begun a separate Science and Technology (S&T) initiative, whose purposes, beginnings, current projects, and future plans are described here.

  1. The Differing Site Conditions Clause: Time for a Change

    DTIC Science & Technology

    1990-09-30

    the character provided for in the contract. The provision of the standard construction contract utilized by agencies of the Federal Government which...unanticipated conditions otherwise attendant upon the performance of construction work.’ Differing site conditions pose a major concern to all I McNulty, "Changed...Conditions (Differing Site Conditions) and Misrepresentations Under Government Construction Contracts" in Construction Contract Changes, Changed

  2. Human factors simulation in construction management education

    NASA Astrophysics Data System (ADS)

    Jaeger, M.; Adair, D.

    2010-06-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management be taught effectively? Although simulations are applied in construction management education, they have not incorporated human factors sufficiently. The focus on human factors as part of the simulation of construction management situations increases students' learning effectiveness within a cross-cultural teaching setting. This paper shows the development of discrete-event human factors in construction management simulation. A description of the source code is given. Learning effectiveness in a cross-cultural education setting was analysed by evaluating data obtained through student questionnaire surveys. The mean score obtained by the students using the simulator was 32% better than those not exposed to the simulator. The spread of results was noticeably greater for the students not exposed to the simulator. The human factors simulation provides an effective means to teach students the complexities and dynamics of interpersonal relationships in construction management.

  3. Assessment of karst activity at highway construction sites using the electrical resistivity method (Greene and Jefferson Counties, Missouri).

    DOT National Transportation Integrated Search

    2006-11-01

    Two-dimensional (2-D) electrical resistivity data were acquired across and in proximity to active sinkholes at two Missouri : Department of Transportation (MoDOT) highway-construction sites. Construction site #1 is located in Greene County, Missouri;...

  4. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  5. Strategies for improving safety performance in construction firms.

    PubMed

    Alarcón, Luis Fernando; Acuña, Diego; Diethelm, Sven; Pellicer, Eugenio

    2016-09-01

    Over the years many prevention management practices have been implemented to prevent and mitigate accidents at the construction site. However, there is little evidence of the effectiveness of individual or combined practices used by companies to manage occupational health and safety issues. The authors selected a sample of 1180 construction firms and 221 individual practices applied in these companies to analyze their effectiveness reducing injury rates over a period of four years in Chile. Different methods were used to study this massive database including: visual analyses of graphical information, statistical analyses and classification techniques. Results showed that practices related to safety incentives and rewards are the most effective from the accident rate viewpoint, even though they are seldom used by companies; on the other hand, practices related to accidents and incidents investigation had a slight negative impact on the accident rate because they are frequently used as a reactive measure. In general, the higher the percentage of prevention practices implemented in a strategy, the lower the accident rate. However, the analysis of the combined effect of prevention practices indicated that the choice of the right combination of practices was more important than just the number of practices implemented. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. A univariate model of river water nitrate time series

    NASA Astrophysics Data System (ADS)

    Worrall, F.; Burt, T. P.

    1999-01-01

    Four time series were taken from three catchments in the North and South of England. The sites chosen included two in predominantly agricultural catchments, one at the tidal limit and one downstream of a sewage treatment works. A time series model was constructed for each of these series as a means of decomposing the elements controlling river water nitrate concentrations and to assess whether this approach could provide a simple management tool for protecting water abstractions. Autoregressive (AR) modelling of the detrended and deseasoned time series showed a "memory effect". This memory effect expressed itself as an increase in the winter-summer difference in nitrate levels that was dependent upon the nitrate concentration 12 or 6 months previously. Autoregressive moving average (ARMA) modelling showed that one of the series contained seasonal, non-stationary elements that appeared as an increasing trend in the winter-summer difference. The ARMA model was used to predict nitrate levels and predictions were tested against data held back from the model construction process - predictions gave average percentage errors of less than 10%. Empirical modelling can therefore provide a simple, efficient method for constructing management models for downstream water abstraction.

  7. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  8. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  9. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  10. 75 FR 879 - National Semiconductor Corporation Arlington Manufacturing Site Including On-Site Leased Workers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... Foods, Allied Barton Security, ASIL, ASML and Construction Mechanical Systems Arlington, TX; Amended... leased workers from ASML and Construction Mechanical Systems were employed on-site at the Arlington... Department is amending the certification to include workers leased from ASML and Construction Mechanical...

  11. An Estimation of Construction and Demolition Debris in Seoul, Korea: Waste Amount, Type, and Estimating Model.

    PubMed

    Seo, Seongwon; Hwang, Yongwoo

    1999-08-01

    Construction and demolition (C&D) debris is generated at the site of various construction activities. However, the amount of the debris is usually so large that it is necessary to estimate the amount of C&D debris as accurately as possible for effective waste management and control in urban areas. In this paper, an effective estimation method using a statistical model was proposed. The estimation process was composed of five steps: estimation of the life span of buildings; estimation of the floor area of buildings to be constructed and demolished; calculation of individual intensity units of C&D debris; and estimation of the future C&D debris production. This method was also applied in the city of Seoul as an actual case, and the estimated amount of C&D debris in Seoul in 2021 was approximately 24 million tons. Of this total amount, 98% was generated by demolition, and the main components of debris were concrete and brick.

  12. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada

    2005-03-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information requiredmore » for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.« less

  13. Community Involvement as an Effective Institutional Control at the Weldon Spring Site, a U.S. Department of Energy Office of Legacy Management Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deyo, Y.E.; Pauling, T.

    2006-07-01

    The U.S. Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) was conducted for the purpose of remediating a portion of a former trinitrotoluene and dinitrotoluene production plant that was operational from 1941 to 1945 and a former uranium refinery that was operational from 1957 to 1966. Surface remediation activities concluded in 2001 with the completion of a 45-acre (.18 square kilometer) on-site engineered disposal facility. Long-term surveillance and maintenance activities at the site were officially transferred to the DOE Office of Legacy Management in 2003. The Weldon Spring Site is located within the St. Louis, Missouri, metropolitanmore » area (population 3 million). DOE's close relationship with surrounding land owners created a need for innovative solutions to long-term surveillance and maintenance issues at the site. Through a Secretarial proclamation, a plan was established for development of a comprehensive public involvement and education program. This program would act as an institutional control to communicate the historical legacy of the site and would make information available about contamination present at the site to guide people in making decisions about appropriate site activities. In August 2002, the Weldon Spring Site Interpretive Center opened to the public with exhibits about the history of the area, the remediation work that was completed, and a site information repository that is available to visitors. In addition, the Hamburg Trail for hiking and biking was constructed as a joint DOE/MDC effort. The 8-mile trail travels through both DOE and MDC property; a series of historical markers posted along its length to communicate the history of the area and the remediation work that was done as part of WSSRAP activities. A ramp and viewing platform with informational plaques were constructed on the disposal cell to provide an additional mechanism for public education. With a basic marketing program, site visitor-ship has been steadily increasing. In 2005, approximately 15,400 visitors were associated with Interpretive Center operations and outreach activities. Science-oriented educational programs that directly relate to past remediation activities and present long-term surveillance and maintenance issues have been developed and are presented to St. Louis area school groups and other community-based organizations. Other innovative programs have been developed to address daily maintenance issues at the site and to promote beneficial community re-use of the property. Approximately 30,000 square feet of the former Administration Building has been transferred through a use-permit to Lindenwood University, a local institution with a total enrollment of about 12,000 students. Lindenwood is establishing a satellite college campus in the building in exchange for providing basic maintenance and payment of utilities for both the Administration Building and Interpretive Center. A volunteer program developed to address maintenance of the native plant gardens that surround the Interpretive Center has a current enrollment of approximately 25 volunteers. Another volunteer group of prairie ecosystem experts has been meeting regularly for the last 3 years to assist the site in long-term management of the established prairie surrounding the disposal cell. Public support of these community involvement activities at the site is strong. DOE has worked closely with the Weldon Spring Citizens Commission in developing the concepts for this approach and the Commission has helped promote these activities within the community. It is expected that continued public education in this manner will only serve to strengthen the institutional control commitments at the Weldon Spring Site. (authors)« less

  14. A site of communication among enterprises for supporting occupational health and safety management system.

    PubMed

    Velonakis, E; Mantas, J; Mavrikakis, I

    2006-01-01

    The occupational health and safety management constitutes a field of increasing interest. Institutions in cooperation with enterprises make synchronized efforts to initiate quality management systems to this field. Computer networks can offer such services via TCP/IP which is a reliable protocol for workflow management between enterprises and institutions. A design of such network is based on several factors in order to achieve defined criteria and connectivity with other networks. The network will be consisted of certain nodes responsible to inform executive persons on Occupational Health and Safety. A web database has been planned for inserting and searching documents, for answering and processing questionnaires. The submission of files to a server and the answers to questionnaires through the web help the experts to make corrections and improvements on their activities. Based on the requirements of enterprises we have constructed a web file server. We submit files in purpose users could retrieve the files which need. The access is limited to authorized users and digital watermarks authenticate and protect digital objects. The Health and Safety Management System follows ISO 18001. The implementation of it, through the web site is an aim. The all application is developed and implemented on a pilot basis for the health services sector. It is all ready installed within a hospital, supporting health and safety management among different departments of the hospital and allowing communication through WEB with other hospitals.

  15. The child and adolescent psychiatry trials network (CAPTN): infrastructure development and lessons learned

    PubMed Central

    Shapiro, Mark; Silva, Susan G; Compton, Scott; Chrisman, Allan; DeVeaugh-Geiss, Joseph; Breland-Noble, Alfiee; Kondo, Douglas; Kirchner, Jerry; March, John S

    2009-01-01

    Background In 2003, the National Institute of Mental Health funded the Child and Adolescent Psychiatry Trials Network (CAPTN) under the Advanced Center for Services and Intervention Research (ACSIR) mechanism. At the time, CAPTN was believed to be both a highly innovative undertaking and a highly speculative one. One reviewer even suggested that CAPTN was "unlikely to succeed, but would be a valuable learning experience for the field." Objective To describe valuable lessons learned in building a clinical research network in pediatric psychiatry, including innovations intended to decrease barriers to research participation. Methods The CAPTN Team has completed construction of the CAPTN network infrastructure, conducted a large, multi-center psychometric study of a novel adverse event reporting tool, and initiated a large antidepressant safety registry and linked pharmacogenomic study focused on severe adverse events. Specific challenges overcome included establishing structures for network organization and governance; recruiting over 150 active CAPTN participants and 15 child psychiatry training programs; developing and implementing procedures for site contracts, regulatory compliance, indemnification and malpractice coverage, human subjects protection training and IRB approval; and constructing an innovative electronic casa report form (eCRF) running on a web-based electronic data capture system; and, finally, establishing procedures for audit trail oversight requirements put forward by, among others, the Food and Drug Administration (FDA). Conclusion Given stable funding for network construction and maintenance, our experience demonstrates that judicious use of web-based technologies for profiling investigators, investigator training, and capturing clinical trials data, when coupled to innovative approaches to network governance, data management and site management, can reduce the costs and burden and improve the feasibility of incorporating clinical research into routine clinical practice. Having successfully achieved its initial aim of constructing a network infrastructure, CAPTN is now a capable platform for large safety registries, pharmacogenetic studies, and randomized practical clinical trials in pediatric psychiatry. PMID:19320979

  16. Tripal: a construction toolkit for online genome databases.

    PubMed

    Ficklin, Stephen P; Sanderson, Lacey-Anne; Cheng, Chun-Huai; Staton, Margaret E; Lee, Taein; Cho, Il-Hyung; Jung, Sook; Bett, Kirstin E; Main, Doreen

    2011-01-01

    As the availability, affordability and magnitude of genomics and genetics research increases so does the need to provide online access to resulting data and analyses. Availability of a tailored online database is the desire for many investigators or research communities; however, managing the Information Technology infrastructure needed to create such a database can be an undesired distraction from primary research or potentially cost prohibitive. Tripal provides simplified site development by merging the power of Drupal, a popular web Content Management System with that of Chado, a community-derived database schema for storage of genomic, genetic and other related biological data. Tripal provides an interface that extends the content management features of Drupal to the data housed in Chado. Furthermore, Tripal provides a web-based Chado installer, genomic data loaders, web-based editing of data for organisms, genomic features, biological libraries, controlled vocabularies and stock collections. Also available are Tripal extensions that support loading and visualizations of NCBI BLAST, InterPro, Kyoto Encyclopedia of Genes and Genomes and Gene Ontology analyses, as well as an extension that provides integration of Tripal with GBrowse, a popular GMOD tool. An Application Programming Interface is available to allow creation of custom extensions by site developers, and the look-and-feel of the site is completely customizable through Drupal-based PHP template files. Addition of non-biological content and user-management is afforded through Drupal. Tripal is an open source and freely available software package found at http://tripal.sourceforge.net.

  17. Tripal: a construction toolkit for online genome databases

    PubMed Central

    Sanderson, Lacey-Anne; Cheng, Chun-Huai; Staton, Margaret E.; Lee, Taein; Cho, Il-Hyung; Jung, Sook; Bett, Kirstin E.; Main, Doreen

    2011-01-01

    As the availability, affordability and magnitude of genomics and genetics research increases so does the need to provide online access to resulting data and analyses. Availability of a tailored online database is the desire for many investigators or research communities; however, managing the Information Technology infrastructure needed to create such a database can be an undesired distraction from primary research or potentially cost prohibitive. Tripal provides simplified site development by merging the power of Drupal, a popular web Content Management System with that of Chado, a community-derived database schema for storage of genomic, genetic and other related biological data. Tripal provides an interface that extends the content management features of Drupal to the data housed in Chado. Furthermore, Tripal provides a web-based Chado installer, genomic data loaders, web-based editing of data for organisms, genomic features, biological libraries, controlled vocabularies and stock collections. Also available are Tripal extensions that support loading and visualizations of NCBI BLAST, InterPro, Kyoto Encyclopedia of Genes and Genomes and Gene Ontology analyses, as well as an extension that provides integration of Tripal with GBrowse, a popular GMOD tool. An Application Programming Interface is available to allow creation of custom extensions by site developers, and the look-and-feel of the site is completely customizable through Drupal-based PHP template files. Addition of non-biological content and user-management is afforded through Drupal. Tripal is an open source and freely available software package found at http://tripal.sourceforge.net PMID:21959868

  18. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    PubMed

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zoeller, William; Slattery, Matt; Grab, Joanna

    In 2009, Mass Development issued a RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A). This report describes the development of high performance, affordable, and replicable designs developed by the team inmore » test homes and plans to move forward with the next buildings.« less

  20. On-Site Construction Productivity Improvement Through Total Quality Management

    DTIC Science & Technology

    1991-12-01

    morale of the work force. i Kaoru Ishikawa , Guide to Ouality Control, (2d ed; New York: Asian Productivity Organization, 1982), p. 45. ’"Ibid. 34...Curve Kaoru Ishikawa , Guide to Quality Control, (2d ed; New York: Asian Productivity Organization, 1982), p. 62. 54 For any normal distribution, 99.73...KAIZEN The Key to Japan’s Comoetitive Success. New York: Random House Business Division, 1986. Ishikawa , Kaoru , Guide to Ouality Control. 2d ed; New

  1. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    DTIC Science & Technology

    1984-05-23

    Because the cost accounting reports provide the historical cost information for the cost estimating reports, we also tested the reasonableness of... accounting and cost estimating reports must be based on timely and accurate infor- mation. The reports, therefore, require the continual attention of... accounting system reported less than half the value of site direct charges (labor, materials, equipment usage, and other costs ) that should have been

  2. Independent External Peer Review Report of the Dredged Material Management Plan for Green Bay, Wisconsin

    DTIC Science & Technology

    2011-06-27

    collapse Independent External Peer Review Report – Green Bay 20 June 2011 B-4 ► Geisler & Kay, Madison, WI, 1981, on steel pipe corrosion ...Hillsboro Stormwater dry basin development and ravine stabilization, Montgomery County, Ill. Wind Farm avian surveys, DeKalb and Pike Counties, Ill., and...site in Houston, Texas, the construction of landfills in New York and Massachusetts, and removal of solidified sludge from two 20-acre basins in

  3. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  4. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  5. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  6. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  7. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  8. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  9. Technology Utilization House Study Report. [For Energy Conservation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The objectives of Project TECH are: (1) to construct a single family detached dwelling for demonstrating the application of advanced technology and minimizing the requirement for energy and utility services, and (2) to help influence future development in home construction by defining the interaction of integrated energy and water management systems with building configuration and construction materials. Components and methods expected to be cost effective over a 20 year span were studied. Emphasis was placed on the utilization of natural heating and cooling characteristics. Orientation and location of windows, landscaping, natural ventilation, and characteristics of the local climate and microclimate were intended to be used to best advantage. Energy conserving homes are most efficient when design for specific sites, therefore project TECH should not be considered a prototype design suitable for all locations. However, it does provide ideas and analytical methods which can be applied to some degree in all housing.

  10. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  11. Research of Ancient Architectures in Jin-Fen Area Based on GIS&BIM Technology

    NASA Astrophysics Data System (ADS)

    Jia, Jing; Zheng, Qiuhong; Gao, Huiying; Sun, Hai

    2017-05-01

    The number of well-preserved ancient buildings located in Shanxi Province, enjoying the absolute maximum proportion of ancient architectures in China, is about 18418, among which, 9053 buildings have the structural style of wood frame. The value of the application of BIM (Building Information Modeling) and GIS (Geographic Information System) is gradually probed and testified in the corresponding fields of ancient architecture’s spatial distribution information management, routine maintenance and special conservation & restoration, the evaluation and simulation of related disasters, such as earthquake. The research objects are ancient architectures in JIN-FEN area, which were first investigated by Sicheng LIANG and recorded in his work of “Chinese ancient architectures survey report”. The research objects, i.e. the ancient architectures in Jin-Fen area include those in Sicheng LIANG’s investigation, and further adjustments were made through authors’ on-site investigation and literature searching & collection. During this research process, the spatial distributing Geodatabase of research objects is established utilizing GIS. The BIM components library for ancient buildings is formed combining on-site investigation data and precedent classic works, such as “Yingzao Fashi”, a treatise on architectural methods in Song Dynasty, “Yongle Encyclopedia” and “Gongcheng Zuofa Zeli”, case collections of engineering practice, by the Ministry of Construction of Qing Dynasty. A building of Guangsheng temple in Hongtong county is selected as an example to elaborate the BIM model construction process based on the BIM components library for ancient buildings. Based on the foregoing work results of spatial distribution data, attribute data of features, 3D graphic information and parametric building information model, the information management system for ancient architectures in Jin-Fen Area, utilizing GIS&BIM technology, could be constructed to support the further research of seismic disaster analysis and seismic performance simulation.

  12. Fall hazard control observed on residential construction sites.

    PubMed

    Kaskutas, Vicki; Dale, Ann Marie; Nolan, James; Patterson, Dennis; Lipscomb, Hester J; Evanoff, Bradley

    2009-06-01

    Falls are a leading cause of mortality and morbidity in the construction industry. This study measured fall hazards at residential construction sites. Trained carpenters administered the St. Louis Audit of Fall Risks and interviewed carpenters. The prevalence of fall prevention practices meeting safety criteria was counted and correlations explored. We identified a high prevalence of fall hazards at the 197 residential sites audited. Roof sheathing met safety criteria most consistently (81%) and truss setting least consistently (28%). Use of personal fall arrest and monitoring of unguarded floor openings were rare. Safer performance on several scales was correlated. Construction sites of large-sized contractors were generally safer than smaller contractors. Apprentice carpenters were less familiar with their employers' fall prevention plan than experienced workers. Safety could be improved with consistent use of recognized fall prevention practices at residential construction sites.

  13. Lung cancer risk among construction workers in California, 1988-2007.

    PubMed

    Calvert, Geoffrey M; Luckhaupt, Sara; Lee, Soo-Jeong; Cress, Rosemary; Schumacher, Pam; Shen, Rui; Tak, SangWoo; Deapen, Dennis

    2012-05-01

    Although lung cancer risks can vary by race/ethnicity and by construction occupation, these risks have not been examined extensively. This study analyzed 110,937 lung cancer cases identified from the California Cancer Registry between 1988 and 2007. Mean age at diagnosis, proportion diagnosed at an advanced stage, and proportion with 3-year survival were calculated for lung cancer cases employed in the construction industry. Case-control methodology was also used to assess the risk of lung cancer. Morbidity odds ratios (MORs) were estimated by conditional logistic regression. Construction workers were found to have a significantly elevated risk for all lung cancer combined (MOR = 1.57) and for each lung cancer histologic subtype examined. All construction occupations, except managers/engineers and supervisors, had a significantly elevated risk for all lung cancer combined. Roofers and welders had the highest risks for total lung cancer and for each of the histologic subtypes. Construction workers in each of the four race/ethnicity groups also had significantly increased lung cancer risks. Compared to non-construction workers, construction workers were diagnosed at an earlier age, at a more advanced stage, and had significantly lower 3-year survival, though differences were modest. These findings justify additional reductions in carcinogenic exposures in construction, and increased support for smoking cessation programs at construction sites. Copyright © 2012 Wiley Periodicals, Inc.

  14. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less

  15. Site Characterization for a Deep Borehole Field Test

    NASA Astrophysics Data System (ADS)

    Kuhlman, K. L.; Hardin, E. L.; Freeze, G. A.; Sassani, D.; Brady, P. V.

    2015-12-01

    The US Department of Energy Office of Nuclear Energy is at the beginning of 5-year Deep Borehole Field Test (DBFT) to investigate the feasibility of constructing and characterizing two boreholes in crystalline basement rock to a depth of 5 km (16,400 ft). The concept of deep borehole disposal for radioactive waste has some advantages over mined repositories, including incremental construction and loading, the enhanced natural barriers provided by deep continental crystalline basement, and reduced site characterization. Site characterization efforts need to determine an eligible site that does not have the following disqualifying characteristics: greater than 2 km to crystalline basement, upward vertical fluid potential gradients, presence of economically exploitable natural resources, presence of high permeability connection to the shallow subsurface, and significant probability of future seismic or volcanic activity. Site characterization activities for the DBFT will include geomechanical (i.e., rock in situ stress state, and fluid pressure), geological (i.e., rock and fracture infill lithology), hydrological (i.e., quantity of fluid, fluid convection properties, and solute transport mechanisms), and geochemical (i.e., rock-water interaction and natural tracers) aspects. Both direct (i.e., sampling and in situ testing) and indirect (i.e., borehole geophysical) methods are planned for efficient and effective characterization of these site aspects and physical processes. Borehole-based characterization will be used to determine the variability of system state (i.e., stress, pressure, temperature, and chemistry) with depth, and interpretation of material and system parameters relevant to numerical site simulation. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  16. E-consult implementation: lessons learned using consolidated framework for implementation research.

    PubMed

    Haverhals, Leah M; Sayre, George; Helfrich, Christian D; Battaglia, Catherine; Aron, David; Stevenson, Lauren D; Kirsh, Susan; Ho, Michael; Lowery, Julie

    2015-12-01

    In 2011, the Veterans Health Administration (VHA) implemented electronic consults (e-consults) as an alternative to in-person specialty visits to improve access and reduce travel for veterans. We conducted an evaluation to understand variation in the use of the new e-consult mechanism and the causes of variable implementation, guided by the Consolidated Framework for Implementation Research (CFIR). Qualitative case studies of 3 high- and 5 low-implementation e-consult pilot sites. Participants included e-consult site leaders, primary care providers, specialists, and support staff identified using a modified snowball sample. We used a 3-step approach, with a structured survey of e-consult site leaders to identify key constructs, based on the CFIR. We then conducted open-ended interviews, focused on key constructs, with all participants. Finally, we produced structured, site-level ratings of CFIR constructs and compared them between high- and low-implementation sites. Site leaders identified 14 initial constructs. We conducted 37 interviews, from which 4 CFIR constructs distinguished high implementation e-consult sites: compatibility, networks and communications, training, and access to knowledge and information. For example, illustrating compatibility, a specialist at a high-implementation site reported that the site changed the order of consult options so that all specialties listed e-consults first to maintain consistency. High-implementation sites also exhibited greater agreement on constructs. By using the CFIR to analyze results, we facilitate future synthesis with other findings, and we better identify common patterns of implementation determinants common across settings.

  17. A review on the benchmarking concept in Malaysian construction safety performance

    NASA Astrophysics Data System (ADS)

    Ishak, Nurfadzillah; Azizan, Muhammad Azizi

    2018-02-01

    Construction industry is one of the major industries that propels Malaysia's economy in highly contributes to our nation's GDP growth, yet the high fatality rates on construction sites have caused concern among safety practitioners and the stakeholders. Hence, there is a need of benchmarking in performance of Malaysia's construction industry especially in terms of safety. This concept can create a fertile ground for ideas, but only in a receptive environment, organization that share good practices and compare their safety performance against other benefit most to establish improvement in safety culture. This research was conducted to study the awareness important, evaluate current practice and improvement, and also identify the constraint in implement of benchmarking on safety performance in our industry. Additionally, interviews with construction professionals were come out with different views on this concept. Comparison has been done to show the different understanding of benchmarking approach and how safety performance can be benchmarked. But, it's viewed as one mission, which to evaluate objectives identified through benchmarking that will improve the organization's safety performance. Finally, the expected result from this research is to help Malaysia's construction industry implement best practice in safety performance management through the concept of benchmarking.

  18. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  19. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    EPA Pesticide Factsheets

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  20. Beyond the material grave: Life Cycle Impact Assessment of leaching from secondary materials in road and earth constructions.

    PubMed

    Schwab, Oliver; Bayer, Peter; Juraske, Ronnie; Verones, Francesca; Hellweg, Stefanie

    2014-10-01

    In industrialized countries, large amounts of mineral wastes are produced. They are re-used in various ways, particularly in road and earth constructions, substituting primary resources such as gravel. However, they may also contain pollutants, such as heavy metals, which may be leached to the groundwater. The toxic impacts of these emissions are so far often neglected within Life Cycle Assessments (LCA) of products or waste treatment services and thus, potentially large environmental impacts are currently missed. This study aims at closing this gap by assessing the ecotoxic impacts of heavy metal leaching from industrial mineral wastes in road and earth constructions. The flows of metals such as Sb, As, Pb, Cd, Cr, Cu, Mo, Ni, V and Zn originating from three typical constructions to the environment are quantified, their fate in the environment is assessed and potential ecotoxic effects evaluated. For our reference country, Germany, the industrial wastes that are applied as Granular Secondary Construction Material (GSCM) carry more than 45,000 t of diverse heavy metals per year. Depending on the material quality and construction type applied, up to 150 t of heavy metals may leach to the environment within the first 100 years after construction. Heavy metal retardation in subsoil can potentially reduce the fate to groundwater by up to 100%. One major challenge of integrating leaching from constructions into macro-scale LCA frameworks is the high variability in micro-scale technical and geographical factors, such as material qualities, construction types and soil types. In our work, we consider a broad range of parameter values in the modeling of leaching and fate. This allows distinguishing between the impacts of various road constructions, as well as sites with different soil properties. The findings of this study promote the quantitative consideration of environmental impacts of long-term leaching in Life Cycle Assessment, complementing site-specific risk assessment, for the design of waste management strategies, particularly in the construction sector. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Mental Constructions and Constructions of Web Sites: Learner and Teacher Points of View

    ERIC Educational Resources Information Center

    Hazzan, Orit

    2004-01-01

    This research focuses on knowledge and ways in which knowledge may be constructed in the learner's mind. Specifically, it addresses the Web as a cognitive supporter for learning, organising and constructing a new domain of knowledge. In particular, the research analyses student reflection on constructing web sites. The analysis is based on an…

  2. Soil properties in high-elevation ski slopes

    NASA Astrophysics Data System (ADS)

    Filippa, Gianluca; Freppaz, Michele; Letey, Stéphanie; Corti, Giuseppe; Cocco, Stefania; Zanini, Ermanno

    2010-05-01

    The development of winter sports determines an increasing impact on the high altitude ecosystems, as a consequence of increased participation and an increasing demand of high quality standards for skiable areas. The construction of a ski slope is associated with a certain impact on soil, which varies as a function of the degree of human-induced disturbance to the native substrata. In this work, we provide a description of the characteristics of alpine tundra ski-slope soils and their nutrient status, contrasted with undisturbed areas. The study site is located in the Monterosaski Resort, Aosta Valley, NW Italy (45°51' N; 7°48' E). We chose 5 sites along an altitudinal gradient between 2700 and 2200 m a.s.l.. Per each site, one plot was established on the ski slope, while a control plot was chosen under comparable topographic conditions a few meters apart. Soils were described and samples were collected and analysed for main chemical-physical properties. In addition an evaluation of N forms, organic matter fractionation and microbial biomass was carried out. Soil depth ranged between 10 to more than 70 cm, both on the ski slope and in the undisturbed areas. A true organo-mineral (A) horizon was firstly identified at 2500 m a.s.l., while a weathering horizon (Bw) was detected at 2400 m a.s.l.. However, a Bw horizon thick enough to be recognised as diagnostic for shifting soil classification order from Entisols to Inceptisols (USDA-Soil Taxonomy) was detected only below 2400 m a.s.l.. Lithic Cryorthents were predominant in the upper part of the sequence (above 2500 m a.s.l.), both in the ski slope and the undisturbed areas; Typic Cryorthents were identified between 2500 and 2400 m a.s.l., while Inceptisols were predominant between 2400 and 2200 m a.s.l.. Chemical-physical properties will be discussed focusing on the main differences between ski slope and undisturbed soils, as determined by the ski slope construction. Pedogenetic processes at high altitude are strongly limited by extreme climatic conditions, resulting in low resistance and resilience with respect to any human-induced changes; therefore, it is key to quantify the impact of ski slope construction and management on such fragile pedo-ecosystems. KEYWORDS: alpine tundra, pedogenesis, ski slope construction, ski slope management

  3. Decentralized approaches to wastewater treatment and management: applicability in developing countries.

    PubMed

    Massoud, May A; Tarhini, Akram; Nasr, Joumana A

    2009-01-01

    Providing reliable and affordable wastewater treatment in rural areas is a challenge in many parts of the world, particularly in developing countries. The problems and limitations of the centralized approaches for wastewater treatment are progressively surfacing. Centralized wastewater collection and treatment systems are costly to build and operate, especially in areas with low population densities and dispersed households. Developing countries lack both the funding to construct centralized facilities and the technical expertise to manage and operate them. Alternatively, the decentralized approach for wastewater treatment which employs a combination of onsite and/or cluster systems is gaining more attention. Such an approach allows for flexibility in management, and simple as well as complex technologies are available. The decentralized system is not only a long-term solution for small communities but is more reliable and cost effective. This paper presents a review of the various decentralized approaches to wastewater treatment and management. A discussion as to their applicability in developing countries, primarily in rural areas, and challenges faced is emphasized all through the paper. While there are many impediments and challenges towards wastewater management in developing countries, these can be overcome by suitable planning and policy implementation. Understanding the receiving environment is crucial for technology selection and should be accomplished by conducting a comprehensive site evaluation process. Centralized management of the decentralized wastewater treatment systems is essential to ensure they are inspected and maintained regularly. Management strategies should be site specific accounting for social, cultural, environmental and economic conditions in the target area.

  4. Construction, water-level, and water-quality data for multiple-well monitoring sites and test wells, Fort Irwin National Training Center, San Bernardino County, California, 2009-12

    USGS Publications Warehouse

    Kjos, Adam R.; Densmore, Jill N.; Nawikas, Joseph M.; Brown, Anthony A.

    2014-01-01

    Because of increasing water demands at the U.S. Army Fort Irwin National Training Center, the U.S. Geological Survey in cooperation with the U.S. Army carried out a study to evaluate the water quality and potential groundwater supply of undeveloped basins within the U.S. Army Fort Irwin National Training Center. In addition, work was performed in the three developed basins—Langford, Bicycle, and Irwin—proximal to or underlying cantonment to provide information in support of water-resources management and to supplement monitoring in these basins. Between 2009 and 2012, the U.S. Geological Survey installed 41 wells to expand collection of water-resource data within the U.S. Army Fort Irwin National Training Center. Thirty-four monitoring wells (2-inch diameter) were constructed at 14 single- or multiple-well monitoring sites and 7 test wells (8-inch diameter) were installed. The majority of the wells were installed in previously undeveloped or minimally developed basins (Cronise, Red Pass, the Central Corridor area, Superior, Goldstone, and Nelson Basins) proximal to cantonment (primary base housing and infrastructure). Data associated with well construction, water-level monitoring, and water-quality sampling are presented in this report.

  5. Federated Web-accessible Clinical Data Management within an Extensible NeuroImaging Database

    PubMed Central

    Keator, David B.; Wei, Dingying; Fennema-Notestine, Christine; Pease, Karen R.; Bockholt, Jeremy; Grethe, Jeffrey S.

    2010-01-01

    Managing vast datasets collected throughout multiple clinical imaging communities has become critical with the ever increasing and diverse nature of datasets. Development of data management infrastructure is further complicated by technical and experimental advances that drive modifications to existing protocols and acquisition of new types of research data to be incorporated into existing data management systems. In this paper, an extensible data management system for clinical neuroimaging studies is introduced: The Human Clinical Imaging Database (HID) and Toolkit. The database schema is constructed to support the storage of new data types without changes to the underlying schema. The complex infrastructure allows management of experiment data, such as image protocol and behavioral task parameters, as well as subject-specific data, including demographics, clinical assessments, and behavioral task performance metrics. Of significant interest, embedded clinical data entry and management tools enhance both consistency of data reporting and automatic entry of data into the database. The Clinical Assessment Layout Manager (CALM) allows users to create on-line data entry forms for use within and across sites, through which data is pulled into the underlying database via the generic clinical assessment management engine (GAME). Importantly, the system is designed to operate in a distributed environment, serving both human users and client applications in a service-oriented manner. Querying capabilities use a built-in multi-database parallel query builder/result combiner, allowing web-accessible queries within and across multiple federated databases. The system along with its documentation is open-source and available from the Neuroimaging Informatics Tools and Resource Clearinghouse (NITRC) site. PMID:20567938

  6. Federated web-accessible clinical data management within an extensible neuroimaging database.

    PubMed

    Ozyurt, I Burak; Keator, David B; Wei, Dingying; Fennema-Notestine, Christine; Pease, Karen R; Bockholt, Jeremy; Grethe, Jeffrey S

    2010-12-01

    Managing vast datasets collected throughout multiple clinical imaging communities has become critical with the ever increasing and diverse nature of datasets. Development of data management infrastructure is further complicated by technical and experimental advances that drive modifications to existing protocols and acquisition of new types of research data to be incorporated into existing data management systems. In this paper, an extensible data management system for clinical neuroimaging studies is introduced: The Human Clinical Imaging Database (HID) and Toolkit. The database schema is constructed to support the storage of new data types without changes to the underlying schema. The complex infrastructure allows management of experiment data, such as image protocol and behavioral task parameters, as well as subject-specific data, including demographics, clinical assessments, and behavioral task performance metrics. Of significant interest, embedded clinical data entry and management tools enhance both consistency of data reporting and automatic entry of data into the database. The Clinical Assessment Layout Manager (CALM) allows users to create on-line data entry forms for use within and across sites, through which data is pulled into the underlying database via the generic clinical assessment management engine (GAME). Importantly, the system is designed to operate in a distributed environment, serving both human users and client applications in a service-oriented manner. Querying capabilities use a built-in multi-database parallel query builder/result combiner, allowing web-accessible queries within and across multiple federated databases. The system along with its documentation is open-source and available from the Neuroimaging Informatics Tools and Resource Clearinghouse (NITRC) site.

  7. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  8. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  9. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  10. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. In the foreground is Tammy Kelly, site manager, with Southeast Cherokee Construction Inc. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  11. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  12. Measuring Air Quality in a Construction Site Biotope Using the AQM-65 Analyser

    NASA Astrophysics Data System (ADS)

    Ioana-Alina, Creţan; Nicoleta, Nemeș

    2017-10-01

    Activities related to the execution of construction works often exert pressure on the quality of environmental factors in adjacent habitat. In various stages of realization of the works if is the opening of the building site and access roads, borrow pits and the storage, or the construction itself, all the related activities will cause harm in various degrees of vegetation on the construction site and its surroundings. Large areas are rendered non-productive and, although they should be restored for use in the same place or elsewhere, sometimes they can lose their natural habitat baseline. The paper is presenting a case study of air quality monitoring using the AQM 65 analyser for a construction site located near Timisoara locality, Timis County, Romania.

  13. Construction Manager or General Contractor?

    ERIC Educational Resources Information Center

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  14. Linking Forests and Fish: The Relationship Between Productivities of Salmonids and Forest Stands in Northern California

    NASA Astrophysics Data System (ADS)

    Wilzbach, P.; Frazey, S.

    2005-05-01

    Productivities of resident salmonid populations, upland, and riparian areas in 25 small watersheds of coastal northern California were estimated and compared to determine if: 1) upland site productivity predicted riparian site productivity; 2) either upland or riparian site productivity predicted salmonid productivity; and 3) other parameters explained more of the variance in salmonid productivity than upland or riparian site productivity. Salmonid productivity was indexed by total salmonid biomass, length of age 1 fish, and percent habitat saturation. Upland and riparian site productivities were estimated using site indices for redwood (Sequoia sempervirens) and red alder (Alnus rubra), respectively. Upland and riparian site indices were correlated, but neither factor contributed to the best approximating models of salmonid biomass or fish length at age one. Salmonid biomass was best described by a positive relationship with drainage area, and length at age was best described by a positive relationship with percent of riparian hardwoods. Percent habitat saturation was not well described by any of the models constructed. Lack of a relationship between upland conifer and salmonid productivity suggests that management of land for timber productivity and component streams for salmonid production in these sites will require separate, albeit integrated, strategies.

  15. [Ecological risk assessment of dam construction for terrestrial plant species in middle reach of Lancangjiang River, Southwest China].

    PubMed

    Li, Xiao-Yan; Dong, Shi-Kui; Liu, Shi-Liang; Peng, Ming-Chun; Li, Jin-Peng; Zhao, Qing-He; Zhang, Zhao-Ling

    2012-08-01

    Taking the surrounding areas of Xiaowan Reservoir in the middle reach of Lancangjiang River as study area, and based on the vegetation investigation at three sites including electricity transmission area (site 1), electricity-transfer substation and roadsides to the substation (site 2), and emigration area (site 3) in 1997 (before dam construction), another investigation was conducted on the vegetation composition, plant coverage, and dominant species at the same sites in 2010 (after dam construction), aimed to evaluate the ecological risk of the dam construction for the terrestrial plant species in middle reach of Lancangjiang River. There was an obvious difference in the summed dominance ratio of dominant species at the three sites before and after the dam construction. According the types of species (dominant and non-dominant species) and the changes of plant dominance, the ecological risk (ER) for the plant species was categorized into 0 to IV, i.e., no or extremely low ecological risk (0), low ecological risk (I), medium ecological risk (II), high ecological risk (III), and extremely high ecological risk (IV). As affected by the dam construction, the majority of the species were at ER III, and a few species were at ER IV. The percentage of the plant species at ER III and ER IV at site 3 was higher than that at sites 1 and 2. The decrease or loss of native plants and the increase of alien or invasive plants were the major ecological risks caused by the dam construction. Effective protection strategies should be adopted to mitigate the ecological risk of the dam construction for the terrestrial plants at species level.

  16. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 etmore » seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.« less

  17. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321more » et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.« less

  18. Scan to Bim for 3d Reconstruction of the Papal Basilica of Saint Francis in Assisi in Italy

    NASA Astrophysics Data System (ADS)

    Angelini, M. G.; Baiocchi, V.; Costantino, D.; Garzia, F.

    2017-05-01

    The historical building heritage, present in the most of Italian cities centres, is, as part of the construction sector, a working potential, but unfortunately it requires planning of more complex and problematic interventions. However, policies to support on the existing interventions, together with a growing sensitivity for the recovery of assets, determine the need to implement specific studies and to analyse the specific problems of each site. The purpose of this paper is to illustrate the methodology and the results obtained from integrated laser scanning activity in order to have precious architectural information useful not only from the cultural heritage point of view but also to construct more operative and powerful tools, such as BIM (Building Information Modelling) aimed to the management of this cultural heritage. The Papal Basilica and the Sacred Convent of Saint Francis in Assisi in Italy are, in fact, characterized by unique and complex peculiarities, which require a detailed knowledge of the sites themselves to ensure visitor's security and safety. For such a project, we have to take in account all the people and personnel normally present in the site, visitors with disabilities and finally the needs for cultural heritage preservation and protection. This aim can be reached using integrated systems and new technologies, such as Internet of Everything (IoE), capable of connecting people, things (smart sensors, devices and actuators; mobile terminals; wearable devices; etc.), data/information/knowledge and processes to reach the desired goals. The IoE system must implement and support an Integrated Multidisciplinary Model for Security and Safety Management (IMMSSM) for the specific context, using a multidisciplinary approach.

  19. Construction Management Meets Today's Realities.

    ERIC Educational Resources Information Center

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  20. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  1. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  2. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  3. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  4. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  5. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  6. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  7. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  8. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  9. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  10. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  11. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  12. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  13. Building the multidisciplinary team for management of patients with hepatocellular carcinoma.

    PubMed

    Naugler, Willscott E; Alsina, Angel E; Frenette, Catherine T; Rossaro, Lorenzo; Sellers, Marty T

    2015-05-01

    Optimal care of the patient with hepatocellular carcinoma (HCC) necessitates the involvement of multiple providers. Because the patient with HCC often carries 2 conditions with competing mortality risks (cancer and underlying cirrhosis), no single provider is equipped to deal with all of these patients' needs adequately. Multidisciplinary teams (MDTs) have evolved to facilitate care coordination, reassessments of clinical course, and nimble changes in treatment plans required for this complex group of patients. Providers or sites that elect to manage patients with HCC thus are increasingly aware of the need to build their own MDT or communicate with an established one. The availability of new communication technologies, such as teleconferencing or teleconsultation, offers the possibility of MDT expansion into underserved or rural areas, as well as areas such as correctional facilities. Although the availability of resources for HCC patient care varies from site to site, construction of an MDT is possible in a wide spectrum of clinical practices, and this article suggests a blueprint for assembly of such collaboration. Research strategies are needed to explain how MDTs improve clinical outcomes so that MDTs themselves can be improved. Copyright © 2015 AGA Institute. Published by Elsevier Inc. All rights reserved.

  14. Brentwood Lessons Learned Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.« less

  15. Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand.

    PubMed

    Manowong, Ektewan

    2012-01-01

    Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.

  16. MX Siting Investigation. Water Resources Program. Volume I. Preliminary Water Management Report.

    DTIC Science & Technology

    1981-09-28

    ficantly less than that of the valley-fill aquifer. This well was not situated, however, in an area of extensive fracturing which has been demonstrated by...SEPT 81 TAOLE 4-41 E-TR-53 63 Section 4.2.1, although wells should be constructed in highly fractured areas for best yields. Carbonate aquifer...correspondingly limited pump capacity. Also, this well was not in a highly fractured area. It is recommended that wells tapping the re- gional carbonate

  17. Geological Data Preservation Program Receives Bipartisan Support

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-09-01

    More than 22 million vertical feet of geologic cores and cuttings fill the Kentucky Geological Survey's Well Sample and Core Library in Lexington. The materials are from at least 22,000 sites within Kentucky—including collections from oil and gas exploration operations, coal and other mining companies, highway construction projects, environmental studies, and federal facilities such as Fort Knox—and they are straining the 15-year-old facility to the point where there is no room to keep everything, according to geologist Patrick Gooding, the library manager.

  18. Environmental Assessment: Construction of Consolidated Fuel Overhaul and Repair Facility at Tinker Air Force Base, Oklahoma

    DTIC Science & Technology

    2007-10-01

    ofbuildings owned, leased, privatized, or otherwise occupied, managed, or controlled by or for the DoD. A 0.83 acre wetland currently exists at the...require displacement of this existing wetland . Therefore, as part of the proposed action, a , wetland habitat of equal or greater value would be...Buildings. However, the new building and parking lot would completely displace the existing wetland on the north side of the site. (EA Section 2.2, Page

  19. Environmental Assessment: Construction of Consolidated Fuel Overhaul and Repair Facility at Tinker Air Force Base, Oklahoma

    DTIC Science & Technology

    2007-10-01

    buildings owned, leased, privatized, or otherwise occupied, managed, or controlled by or for the DoD. A 0.83 acre wetland currently exists at the...would require displacement of this existing wetland . Therefore, as part of the proposed action, a wetland habitat of equal or greater value would be...Buildings. However, the new building and parking lot would completely displace the existing wetland on the north side of the site. (EA Section 2.2, Page

  20. Environmental Assessment Supplement: Proposed Military Construction Project, Deployable Medical System Training Area and Military Equipment Parking, Fairchild Air Force Base, Washington

    DTIC Science & Technology

    2011-11-01

    considered semi-improved and mowed four times a year. The site is treated twice a year with herbicides to control invasive pest plants: diffuse...According to the Fairchild AFB Pest Management Plan, contractors mix all pesticide and herbicide chemicals off-base (92 CES/CEAN, 2007...1) Armed Forces Reserve Center (AFRC) – A main building approximately 80,900 square feet (s.f.) for office space, assembly hall with kitchen

  1. Historic Context and Management Plan for the Quarry Pond Archeological Complex on Fort Drum

    DTIC Science & Technology

    2012-04-01

    owner at that time). The purchase of the entire village and 4,500 acres of adjoining land cost Sterling $10,000; the purchase was made in partnership...roads, all at a cost of $13,000. Additionally, the company provided land for the construction of a Catholic Church, possibly for the Irish laborers that...site for limestone, as the raw stone required significant cost and effort to move any distance. The burnt lime was much reduced in bulk from the

  2. Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District

    DTIC Science & Technology

    1991-08-01

    0 (Malacothrix saxatilis var. arachnoidea) j 88089 9-79 9. Vcetation and Terestrial W TABLE 9-6 (Continued) sit,2 Taa Status’ NLP CAC SCIC CHU NSC...construction, the parking site could become a park and ride facdy. Alternatively, the contractor could lease existing unused parking space from private...moie oe Residential - mutti~family Trans’int lodgng - motels, hotels I Schools, libraries, churches, hospitals. Actively used open spaces

  3. Sustainability assessment and prioritisation of bottom ash management in Macao.

    PubMed

    Sou, W I; Chu, Andrea; Chiueh, P T

    2016-12-01

    In Macao, about 7200 t yr -1 of bottom ash (BA) is generated and conventionally landfilled with construction waste. Because the properties of BA are similar to those of natural aggregates, it is suitable to be recycled as construction material. However, pre-treatment processes for BA reuse may require more resource input and may generate additional environmental impacts. Life cycle assessment, multi-media transport model analysis, cost-benefit analysis and the analytical hierarchy process were conducted to evaluate the impacts of current and potential BA management scenarios regarding environmental, economic, social and regulatory aspects. The five analysed scenarios are as follows: (0) BA buried with construction and demolition waste (current system); (1) pre-treated BA used to replace 25% of the natural aggregate in asphalt concrete; (2) pre-treated BA used to replace 25% of the natural aggregate in cement concrete; (3) pre-treated BA used to replace 25% of cement in cement concrete; and (4) pre-treated BA sent to China, blended with municipal solid waste for landfill. The results reveal the following ranking of the scenarios: 3 > 2 > 0 > 1 > 4. Scenario 3 shows the best conditions for BA recycling, because the quantity of cement concrete output is the highest and this brings the greatest economic benefits. Our use of integrated analysis provides multi-aspect investigations for BA management systems, particularly in accounting for site-specific characteristics. This approach is suitable for application in other non-western regions. © The Author(s) 2016.

  4. Integrated Management of all Historical, Operational and Future Decomissioning Solid ILW at Dounreay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graham, D.

    This paper describes major components of the Dounreay Site Restoration Plan, DSRP to deal with the site's solid intermediate level waste, ILW legacy. Historic solid ILW exists in the Shaft (disposals between 1959 and 1977), the Wet Silo (operated between 1973 and 1998), and in operating engineered drummed storage. Significant further arisings are expected from future operations, post-operations clean out and decommissioning through to the completion of site restoration, expected to be complete by about 2060. The raw waste is in many solid forms and also incorporates sludge, some fissile material and hazardous chemical components. The aim of the Solidmore » ILW Project is to treat and condition all this waste to make it passively safe and in a form which can be stored for a substantial period, and then transported to the planned U.K. national deep repository for ILW disposal. The Solid ILW Project involves the construction of head works for waste retrieval operations at the Shaft and Wet Silo, a Waste Treatment Plant and a Conditioned Waste Store to hold the conditioned waste until the disposal facilities become available. In addition, there are infrastructure activities to enable the new construction: contaminated ground remediation, existing building demolition, underground and overground services diversion, sea cliff stabilization, and groundwater isolation at the Shaft.« less

  5. Sustainable Approaches for Materials Management in Remote ...

    EPA Pesticide Factsheets

    Remote, economically challenged areas in the Commonwealth of the Northern Marianas Islands (CNMI) and American Samoa in the US Pacific island territories face unique challenges with respect to solid waste management. These islands are remote and isolated, with some islands supporting only small populations, thus limiting options for pooling resources among communities in the form of regional waste management facilities, as is common on the US mainland. This isolation also results in greater costs for waste management compared to those encountered in the mainland US, a consequence of, among other factors, more expensive construction and maintenance costs because of the necessary transport of facility components (e.g., landfill liner materials) and the decreased attractiveness of waste recovery for recycling because of lower commodity prices after off-island transportation. Adding to these economic limitations, the gross domestic product and per capita income of the Pacific territories is less than half what it is in parts of the US. The first section of this report outlines a snapshot of the current state of solid waste management overall in the US Pacific island territories, primarily based on site visits.. Steps involved in this work included a review of selected existing published information related to the subject; site visits to Guam, Saipan, Tinian, Rota, Tutuila, and Apia; an assessment of the technical and economic feasibility of different solid waste

  6. 54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, AND CONSTRUCTION OF EMBANKMENT FOR RAILROAD SPUR. c.1898 (AKZO No. A-3) - Avery Island Salt Works, Akzo Salt Incorporated, Avery Island, Iberia Parish, LA

  7. Stream Phosphorus Dynamics Along a Suburbanizing Gradient in Southern Ontario, Canada

    NASA Astrophysics Data System (ADS)

    Duval, T. P.

    2017-12-01

    While it is well known that urban streams are subject to impaired water quality relative to natural analogues, far less research has been directed at stream water quality during the process of (sub-) urbanization. This study determines the role of housing construction activities in Brampton, Canada on the concentration and flux of phosphorus (P) of a headwater stream. Prior to development the stream was engineered with a riffle-pool sequence, riparian plantings, and a floodplain corridor that was lined with sediment fencing. Stream sites were sampled daily over a period of six months at locations representing varying stages of subdivision completion (upper site -active construction; middle site -finished construction and natural vegetation; lower site -finished construction and active construction). A nearby urban stream site developed ten years prior to this study was selected as a reference site. There were no differences in total phosphorus (TP) levels or flux between the suburbanizing and urban streams; however, the forms of P differed between sites. The urban stream TP load was dominated by particulate phosphorus (PP) while suburbanizing stream P was mainly in the dissolved organic phosphorus (DOP) form. The importance of DOP to TP flux increased with the onset of the growing season. TP levels in all stream segments frequently exceeded provincial water quality guidelines during storm events but were generally low during baseflow conditions. During storm events PP and total suspended solid levels in the suburbanizing stream reached levels of the urban stream due to sediment fence failure at several locations along the construction-hillslope interface. Along the suburbanizing gradient, the hydrological connection to a mid-reach zone of no-construction activity / fallow field and native forest resulted in significantly lower P levels than the upper suburbanizing stream site. This suggests that stream channel design features as well as timing of construction activities and the hydrological connection between the stream and construction projects all contribute to downstream export of nutrients and ultimately stream water quality.

  8. Turbidity monitoring at select MDOT construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  9. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  10. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  11. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  12. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  13. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  14. Interpersonal Conflict Management

    ERIC Educational Resources Information Center

    Roark, Albert E.

    1978-01-01

    The difference between constructive and destructive conflicts may be traced to the way in which they are managed. Third-party help is often utilized to achieve constructive conflict management. This article describes two models for conflict management consultation. Five guidelines are given for constructive conflict management. (Author/JEL)

  15. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    PubMed

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  16. A Global Survey of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D): A Guide to Interactive Global Map Layers, Table Database, References and Notes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, Mark C.; Russell, Glenn P.; Perry, Frank V.

    These associated tables, references, notes, and report present a synthesis of some notable geotechnical and engineering information used to create four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies or disposal facilities 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding “deep underground” facilities, history, activities, and plans. In general, the interactive maps and database provide each facility’s approximate site location, geology, and engineered features (e.g.:more » access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not comprehensive, it is representative of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.« less

  17. Case Study of Urban Residential Remediation and Restoration in Port Hope, Canada - 13250

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geddes, Brian; DeJong, John; Owen, Michael

    2013-07-01

    The Canadian Municipality of Port Hope, Ontario, is located some 100 km east of Toronto and has been the location of radium and/or uranium refining since the 1930's. Historically, these activities involved materials containing radium-226, uranium, arsenic and other contaminants generated by the refining process. In years past, properties and sites in Port Hope became contaminated from spillage during transportation, unrecorded, un-monitored or unauthorized diversion of contaminated fill and materials, wind and water erosion and spread from residue storage areas. Residential properties in Port Hope impacted by radioactive materials are being addressed by the Canadian federal government under programs administeredmore » by the Low-Level Radioactive Waste Management Office (LLRWMO) and the Port Hope Area Initiative Management Office (PHAIMO). Issues that currently arise at these properties are addressed by the LLRWMO's Interim Waste Management Program (IWM). In the future, these sites will be included in the PHAIMO's Small Scale Sites (SSS) remedial program. The LLRWMO has recently completed a remediation and restoration program at a residential property in Port Hope that has provided learnings that will be applicable to the PHAIMO's upcoming SSS remedial effort. The work scope at this property involved remediating contaminated refinery materials that had been re-used in the original construction of the residence. Following removal of the contaminated materials, the property was restored for continued residential use. This kind of property represents a relatively small, but potentially challenging subset of the portfolio of sites that will eventually be addressed by the SSS program. (authors)« less

  18. Voluntarism, public engagement and the role of geoscience in radioactive waste management policy-making

    NASA Astrophysics Data System (ADS)

    Bilham, Nic

    2014-05-01

    In the UK, as elsewhere in Europe, there has been a move away from previous 'technocratic' approaches to radioactive waste management (RWM). Policy-makers have recognised that for any RWM programme to succeed, sustained engagement with stakeholders and the public is necessary, and any geological repository must be constructed and operated with the willing support of the community which hosts it. This has opened up RWM policy-making and implementation to a wider range of (often contested) expert inputs, ranging across natural and social sciences, engineering and even ethics. Geoscientists and other technical specialists have found themselves drawn into debates about how various types of expertise should be prioritised, and how they should be integrated with diverse public and stakeholder perspectives. They also have a vital role to play in communicating to the public the need for geological disposal of radioactive waste, and the various aspects of geoscience which will inform the process of implementing this, from identifying potential volunteer host communities, to finding a suitable site, developing the safety case, construction of a repository, emplacement of waste, closure and subsequent monitoring. High-quality geoscience, effectively communicated, will be essential to building and maintaining public confidence throughout the many decades such projects will take. Failure to communicate effectively the relevant geoscience and its central role in the UK's radioactive waste management programme arguably contributed to West Cumbria's January 2013 decision to withdraw from the site selection process, and may discourage other communities from coming forward in future. Across countries needing to deal with their radioactive waste, this unique challenge gives an unprecedented urgency to finding ways to engage and communicate effectively with the public about geoscience.

  19. Photovoltaic balance-of-system designs and costs at PVUSA

    NASA Astrophysics Data System (ADS)

    Reyes, A. B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  20. 226. Early construction on section 2A1. This was the site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    226. Early construction on section 2-A-1. This was the site of the first construction on the Blue Ride Parkway. - Blue Ridge Parkway, Between Shenandoah National Park & Great Smoky Mountains, Asheville, Buncombe County, NC

  1. The Relative Importance of the Vadose Zone in Multimedia Risk Assessment Modeling Applied at a National Scale: An Analysis of Benzene Using 3MRA

    NASA Astrophysics Data System (ADS)

    Babendreier, J. E.

    2002-05-01

    Evaluating uncertainty and parameter sensitivity in environmental models can be a difficult task, even for low-order, single-media constructs driven by a unique set of site-specific data. The challenge of examining ever more complex, integrated, higher-order models is a formidable one, particularly in regulatory settings applied on a national scale. Quantitative assessment of uncertainty and sensitivity within integrated, multimedia models that simulate hundreds of sites, spanning multiple geographical and ecological regions, will ultimately require a systematic, comparative approach coupled with sufficient computational power. The Multimedia, Multipathway, and Multireceptor Risk Assessment Model (3MRA) is an important code being developed by the United States Environmental Protection Agency for use in site-scale risk assessment (e.g. hazardous waste management facilities). The model currently entails over 700 variables, 185 of which are explicitly stochastic. The 3MRA can start with a chemical concentration in a waste management unit (WMU). It estimates the release and transport of the chemical throughout the environment, and predicts associated exposure and risk. The 3MRA simulates multimedia (air, water, soil, sediments), pollutant fate and transport, multipathway exposure routes (food ingestion, water ingestion, soil ingestion, air inhalation, etc.), multireceptor exposures (resident, gardener, farmer, fisher, ecological habitats and populations), and resulting risk (human cancer and non-cancer effects, ecological population and community effects). The 3MRA collates the output for an overall national risk assessment, offering a probabilistic strategy as a basis for regulatory decisions. To facilitate model execution of 3MRA for purposes of conducting uncertainty and sensitivity analysis, a PC-based supercomputer cluster was constructed. Design of SuperMUSE, a 125 GHz Windows-based Supercomputer for Model Uncertainty and Sensitivity Evaluation is described, along with the conceptual layout of an accompanying java-based paralleling software toolset. Preliminary work is also reported for a scenario involving Benzene disposal that describes the relative importance of the vadose zone in driving risk levels for ecological receptors and human health. Incorporating landfills, waste piles, aerated tanks, surface impoundments, and land application units, the site-based data used in the analysis included 201 national facilities representing 419 site-WMU combinations.

  2. Construction of web-based nutrition education contents and searching engine for usage of healthy menu of children

    PubMed Central

    Lee, Tae-Kyong; Chung, Hea-Jung; Park, Hye-Kyung; Lee, Eun-Ju; Nam, Hye-Seon; Jung, Soon-Im; Cho, Jee-Ye; Lee, Jin-Hee; Kim, Gon; Kim, Min-Chan

    2008-01-01

    A diet habit, which is developed in childhood, lasts for a life time. In this sense, nutrition education and early exposure to healthy menus in childhood is important. Children these days have easy access to the internet. Thus, a web-based nutrition education program for children is an effective tool for nutrition education of children. This site provides the material of the nutrition education for children with characters which are personified nutrients. The 151 menus are stored in the site together with video script of the cooking process. The menus are classified by the criteria based on age, menu type and the ethnic origin of the menu. The site provides a search function. There are three kinds of search conditions which are key words, menu type and "between" expression of nutrients such as calorie and other nutrients. The site is developed with the operating system Windows 2003 Server, the web server ZEUS 5, development language JSP, and database management system Oracle 10 g. PMID:20126375

  3. Construction Management--Exploding Some Myths.

    ERIC Educational Resources Information Center

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  4. Improvement of the material and transport component of the system of construction waste management

    NASA Astrophysics Data System (ADS)

    Kostyshak, Mikhail; Lunyakov, Mikhail

    2017-10-01

    Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.

  5. Nest site ecology of the Cross River gorilla at the Kagwene Gorilla Sanctuary, Cameroon, with special reference to anthropogenic influence.

    PubMed

    De Vere, Ruth A; Warren, Ymke; Nicholas, Aaron; Mackenzie, Mary E; Higham, James P

    2011-03-01

    The Cross River gorilla is the most endangered of all Great Apes. It is currently found in 14 apparently geographically separate and increasingly isolated populations, which face severe threats from habitat loss and the bushmeat trade. Recent years have seen greater efforts to conserve the Cross River gorilla across the landscape, but details of the ecology of individual populations that might help in conservation initiatives are lacking. Here, we report on the production of the first habitat map for the recently created Kagwene Gorilla Sanctuary (KGS), Cameroon, and the results of an analysis of nest site preferences of the gorillas that live there. Qualitative vegetation assessments were made to assign various categories to the topstory and understory throughout the sanctuary, and nest sites constructed between January 2006 and March 2008 were re-visited and assessed for possible site preferences. The habitat map revealed significant anthropogenic impact, with only 57% of the KGS being relatively undisturbed primary forest. Analysis of nest sites showed that ground nests are constructed preferentially in the dry season, on precipitous slopes, in light gaps and clearings, with an understory of mixed herbs. Tree nests are predominantly built in the wet season, in primary forest with saplings as the preferred understory. Gorillas avoid nesting in grasslands and farms, which visibly fragment the remaining forest in the sanctuary. The results have implications for the conservation and management of the Cross River gorilla at KGS, and offer new insight into the nesting ecology of this subspecies. 2010 Wiley-Liss, Inc.

  6. Lithologic and ground-water data for monitoring sites in the Mojave River and Warren Valley basins, San Bernardino County, California, 1992-1998

    USGS Publications Warehouse

    Huff, Julia A.; Clark, Dennis A.; Martin, Peter

    2002-01-01

    Lithologic and ground-water data were collected at 85 monitoring sites constructed in the Mojave Water Agency Management area in San Bernardino County, California, as part of a series of cooperative studies between the U.S. Geological Survey and the Mojave Water Agency. The data are being used to evaluate and address water-supply and water-quality issues. This report presents a compilation of the data collected at these sites from 1992 through 1998, including location and design of the monitoring sites, lithologic data, geophysical logs, ground-water-level measurements, and water-quality analyses.One to five small (generally 2-inch) diameter wells were installed at each of the 85 monitoring sites to collect depth-dependent hydrologic data. Lithologic logs were compiled from descriptions of drill cuttings collected at each site and from observations recorded during the drilling of the borehole. Generalized stratigraphic columns were compiled by grouping similar lithologic units. Geophysical logs provide information on the character of the lithologic units and on the presence of ground water and the chemical characteristics of that water. Water-level and water-quality data were collected periodically from the sites during 1992 through 1998.

  7. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  8. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  9. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  10. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less

  11. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...

  12. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites.

    PubMed

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-03-08

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites.

  13. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    PubMed Central

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  14. Habitat preferences of foraging red-cockaded woodpeckers at the Savannah River Site, South Carolina.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franzreb, Kathleen, E.

    2004-12-31

    Franzreb, Kathleen, E. 2004. Habitat preferences of foraging red-cockaded woodpeckers at the Savannah River Site, South Carolina. In: Red-cockaded woodpecker; Road to Recovery. Proceedings of the 4th Red-cockaded woodpecker Symposium. Ralph Costa and Susan J. Daniels, eds. Savannah, Georgia. January, 2003. Chapter 9. Habitat Management and Habitat Relationships. Pp 553-561. Abstract: I constructed a foraging study to examine habitat use of red-cockaded woodpeckers at the Savannah River Site, South Carolina. Because much of the land had been harvested in the late 1940s and early 1950s prior to being sold to the Department of Energy, the available habitat largely consisted ofmore » younger trees (e.g., less than 40 years old). From 1992 to 1995, I examined the foraging behavior and reproductive success of 7 groups of red-cockaded woodpeckers.« less

  15. Assessing Landscape Constraints on Species Abundance: Does the Neighborhood Limit Species Response to Local Habitat Conservation Programs?

    PubMed Central

    Jorgensen, Christopher F.; Powell, Larkin A.; Lusk, Jeffery J.; Bishop, Andrew A.; Fontaine, Joseph J.

    2014-01-01

    Landscapes in agricultural systems continue to undergo significant change, and the loss of biodiversity is an ever-increasing threat. Although habitat restoration is beneficial, management actions do not always result in the desired outcome. Managers must understand why management actions fail; yet, past studies have focused on assessing habitat attributes at a single spatial scale, and often fail to consider the importance of ecological mechanisms that act across spatial scales. We located survey sites across southern Nebraska, USA and conducted point counts to estimate Ring-necked Pheasant abundance, an economically important species to the region, while simultaneously quantifying landscape effects using a geographic information system. To identify suitable areas for allocating limited management resources, we assessed land cover relationships to our counts using a Bayesian binomial-Poisson hierarchical model to construct predictive Species Distribution Models of relative abundance. Our results indicated that landscape scale land cover variables severely constrained or, alternatively, facilitated the positive effects of local land management for Ring-necked Pheasants. PMID:24918779

  16. Assessing landscape constraints on species abundance: Does the neighborhood limit species response to local habitat conservation programs?

    USGS Publications Warehouse

    Jorgensen, Christopher F.; Powell, Larkin A.; Lusk, Jeffrey J.; Bishop, Andrew A.; Fontaine, Joseph J.

    2014-01-01

    Landscapes in agricultural systems continue to undergo significant change, and the loss of biodiversity is an ever-increasing threat. Although habitat restoration is beneficial, management actions do not always result in the desired outcome. Managers must understand why management actions fail; yet, past studies have focused on assessing habitat attributes at a single spatial scale, and often fail to consider the importance of ecological mechanisms that act across spatial scales. We located survey sites across southern Nebraska, USA and conducted point counts to estimate Ring-necked Pheasant abundance, an economically important species to the region, while simultaneously quantifying landscape effects using a geographic information system. To identify suitable areas for allocating limited management resources, we assessed land cover relationships to our counts using a Bayesian binomial-Poisson hierarchical model to construct predictive Species Distribution Models of relative abundance. Our results indicated that landscape scale land cover variables severely constrained or, alternatively, facilitated the positive effects of local land management for Ring-necked Pheasants.

  17. Event-based soil loss models for construction sites

    NASA Astrophysics Data System (ADS)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  18. Use of Artificial Burrows by Burrowing Owls (Athene cunicularia) at the HAMMER Facility on the U.S. Department of Energy Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.

    In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less

  19. Management of construction and demolition wastes as secondary building resources

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  20. Construction Management: Building Schools Faster in the International Marketplace

    ERIC Educational Resources Information Center

    Scarano, Joseph J.

    1976-01-01

    Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)

  1. Influence of safety motivation and climate on safety behaviour and outcomes: evidence from the Saudi Arabian construction industry.

    PubMed

    Panuwatwanich, Kriengsak; Al-Haadir, Saeed; Stewart, Rodney A

    2017-03-01

    Over the last three decades, safety literature has focused on safety climate and its role in forecasting injuries and accidents. However, research findings regarding the relationships between safety climate and other key outcome constructs are somewhat inconsistent. Recent safety climate literature suggests that examining the role of safety motivation may help provide a better explanation of such relationships. The research presented in this article aimed to empirically analyse the relationships among safety motivation, safety climate, safety behaviour and safety outcomes within the context of the Saudi Arabian construction industry. A conceptual model was developed to examine the relationships among four main constructs: safety motivation, safety climate, safety behaviour and safety outcomes. Based on the survey data collected in Saudi Arabia from site engineers and project managers (n = 295), statistical analyses were carried out, including confirmatory and exploratory factor analysis, and structural equation modelling to assess the model and test the hypotheses. The main results indicated that safety motivation could positively influence safety behaviour through safety climate, which plays a mediating role for this mechanism. The results also confirmed that safety behaviour could predict safety outcomes within the context of the Saudi Arabian construction industry.

  2. National Register of Historic Places multiple property documentation form -- Historic, archaeological, and traditional cultural properties of the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nickens, P.R.

    The US Department of Energy`s Hanford Site encompasses an area of 560 square miles on the Columbia River in southeastern Washington. Since 1943, the Hanford Site has existed as a protected area for activities primarily related to the production of radioactive materials for national defense uses. For cultural resources on the Hanford Site, establishment of the nuclear reservation as a high security area, with public access restricted, has resulted in a well-protected status, although no deliberate resource protection measures were in effect to mitigate effects of facilities construction and associated activities. Thus, the Hanford Site contains an extensive record ofmore » aboriginal archaeological sites and Native American cultural properties, along with pre-Hanford Euro-American sites (primarily archaeological in nature with the removal of most pre-1943 structures), and a considerable number of Manhattan Project/Cold War era buildings and structures. The recent mission change from production to clean up and disposal of DOE lands created a critical need for development and implementation of new and different cultural resource management strategies. DOE-RL has undertaken a preservation planning effort for the Hanford Site. The intent of this Plan is to enable DOE-RL to organize data and develop goals, objectives, and priorities for the identification, evaluation, registration, protection, preservation, and enhancement of the Site`s historical and cultural properties. Decisions made about the identification, evaluation, registration and treatment of historic properties are most aptly made when relationships between individual properties and other similar properties are considered. The historic context and the multiple property documentation (NTD) process provides DOE-RL the organizational framework for these decisions. Once significant patterns are identified, contexts developed, and expected properties are defined, the NTD process provides the foundation for future decisions concerning the management of significant cultural resources on the Hanford Site.« less

  3. Territory and nest site selection patterns by Grasshopper Sparrows in southeastern Arizona

    USGS Publications Warehouse

    Ruth, Janet M.; Skagen, Susan K.

    2017-01-01

    Grassland bird populations are showing some of the greatest rates of decline of any North American birds, prompting measures to protect and improve important habitat. We assessed how vegetation structure and composition, habitat features often targeted for management, affected territory and nest site selection by Grasshopper Sparrows (Ammodramus savannarum ammolegus) in southeastern Arizona. To identify features important to males establishing territories, we compared vegetation characteristics of known territories and random samples on 2 sites over 5 years. We examined habitat selection patterns of females by comparing characteristics of nest sites with territories over 3 years. Males selected territories in areas of sparser vegetation structure and more tall shrubs (>2 m) than random plots on the site with low shrub densities. Males did not select territories based on the proportion of exotic grasses. Females generally located nest sites in areas with lower small shrub (1–2 m tall) densities than territories overall when possible and preferentially selected native grasses for nest construction. Whether habitat selection was apparent depended upon the range of vegetation structure that was available. We identified an upper threshold above which grass structure seemed to be too high and dense for Grasshopper Sparrows. Our results suggest that some management that reduces vegetative structure may benefit this species in desert grasslands at the nest and territory scale. However, we did not assess initial male habitat selection at a broader landscape scale where their selection patterns may be different and could be influenced by vegetation density and structure outside the range of values sampled in this study.

  4. Application Analysis of BIM Technology in Metro Rail Transit

    NASA Astrophysics Data System (ADS)

    Liu, Bei; Sun, Xianbin

    2018-03-01

    With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.

  5. Assessment of safety culture among job positions in high-rise construction: a hybrid fuzzy multi criteria decision-making (FMCDM) approach.

    PubMed

    Ardeshir, A; Mohajeri, M

    2018-06-01

    The construction industry is known as one of the most dangerous industries, which not only requires sound operation of executive laws and regulations, but also necessitates the safety culture of all workers at workshops. Therefore, the aim of this research is to identify the factors of safety culture and ranking occupations in jobsites based on those factors in order to proactively improve the safety culture of construction projects and subsequently promote safety conditions and worksites. In this study, safety culture criteria are weighted by a combination of Fuzzy Decision Trail and Evaluation Laboratory and Fuzzy ANP methods. Next, different job positions in high-rise projects are ranked using the Fuzzy Technique for Order of Preference by Similarity to Ideal Solution method. Findings demonstrated that the project manager, site superintendent and supervisor occupations had the highest and labourers had the lowest level of safety culture in the high-rise construction industry. Furthermore, factors such as safety supervision and training must be considered more seriously in order to create a positive safety culture among workers.

  6. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  7. Between a rock and a soft place: Using optical ages to date ancient clam gardens on the Pacific Northwest

    PubMed Central

    Neudorf, Christina M.; Smith, Nicole; Lepofsky, Dana; Toniello, Ginevra; Lian, Olav B.

    2017-01-01

    Rock-walled archaeological features are notoriously hard to date, largely because of the absence of suitable organic material for radiocarbon dating. This study demonstrates the efficacy of dating clam garden wall construction using optical dating, and uses optical ages to determine how sedimentation rates in the intertidal zone are affected by clam garden construction. Clam gardens are rock-walled, intertidal terraces that were constructed and maintained by coastal First Nation peoples to increase bivalve habitat and productivity. These features are evidence of ancient shellfish mariculture on the Pacific Northwest and, based on radiocarbon dating, date to at least the late Holocene. Optical dating exploits the luminescence signals of quartz or feldspar minerals to determine the last time the minerals were exposed to sunlight (i.e., their burial age), and thus does not require the presence of organic material. Optical ages were obtained from three clam garden sites on northern Quadra Island, British Columbia, and their reliability was assessed by comparing them to radiocarbon ages derived from shells underneath the clam garden walls, as well as below the terrace sediments. Our optical and radiocarbon ages suggest that construction of these clam garden walls commenced between ~1000 and ~1700 years ago, and our optical ages suggest that construction of the walls was likely incremental and increased sedimentation rates in the intertidal zone by up to fourfold. Results of this study show that when site characteristics are not amenable to radiocarbon dating, optical dating may be the only viable geochronometer. Furthermore, dating rock-walled marine management features and their geomorphic impact can lead to significant advances in our understanding of the intimate relationships that Indigenous peoples worldwide developed with their seascapes. PMID:28182645

  8. The role of constructed wetlands for biomass production within the water-soil-waste nexus.

    PubMed

    Avellan, C T; Ardakanian, R; Gremillion, P

    2017-05-01

    The use of constructed wetlands for water pollution control has a long standing tradition in urban, peri-urban, rural, agricultural and mining environments. The capacity of wetland plants to take up nutrients and to filter organic matter has been widely discussed and presented in diverse fora and published in hundreds of articles. In an ever increasingly complex global world, constructed wetlands not only play a role in providing safe sanitation in decentralized settings, shelter for biodiversity, and cleansing of polluted sites, in addition, they produce biomass that can be harvested and used for the production of fodder and fuel. The United Nations University Institute for Integrated Management of Material Fluxes and of Resources (UNU-FLORES) was established in December 2012 in Dresden, Germany, to assess the trade-offs between and among resources when making sustainable decisions. Against the backdrop of the Water-Energy-Food Nexus, which was introduced as a critical element for the discussions on sustainability at Rio +20, the UNU was mandated to pay critical attention to the interconnections of the underlying resources, namely, water, soil and waste. Biomass for human consumption comes in the form of food for direct use, as fodder for livestock, and as semi-woody biomass for fuelling purposes, be it directly for heating and cooking or for the production of biogas and/or biofuel. Given the universal applicability of constructed wetlands in virtually all settings, from arid to tropical, from relatively high to low nutrient loads, and from a vast variety of pollutants, we postulate that the biomass produced in constructed wetlands can be used more extensively in order to enhance the multi-purpose use of these sites.

  9. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  10. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  11. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  12. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  13. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  14. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  15. Internet-based Interactive Construction Management Learning System.

    ERIC Educational Resources Information Center

    Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy

    2001-01-01

    Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…

  16. PROFILE: Integrated Management to Create New Breeding Habitat for Dalmatian Pelicans (Pelecanus crispus) in Greece

    PubMed

    Pyrovetsi

    1997-09-01

    / An integrated management plan to create favorable nesting habitat for the world-endangered Dalmatian pelicans, was tested at Kerkini irrigation reservoir, a Ramsar wetland. The lake is the major wintering site of Dalmatian pelicans in Europe, where the species lives year-round without breeding. The rise of water level at the reservoir during spring (exceeding 5 m) has an impact on the whole system, including several birds, which lose their nesting habitat. Although the integrity of the wetland demands ecological restoration with changes in its hydrologic regime, local socioeconomic conditions allow only habitat level interventions. During the planning phase of the management plan, both the ecological and social context of the interventions were considered. Monitoring of all pelican habitats and populations provided the scientific basis, while a socioecological survey on knowledge/attitudes of local fishermen toward wetland identified conflicts with specific resources and planned management. To gain public support, a broad information/education program was implemented. The education program for fishermen was based on the findings of the socioecological survey. The in situ management involved experimental construction of floating rafts, platforms over water, dredged-spoil islands, and platforms at various sites of the wetland. Monitoring of the managed habitats showed that most waterbirds used them for resting and roosting. Common terns nested on the rafts, cormorants on the platforms, and Dalmatian pelicans on the man-made island. Under the prevailing hydrologic and weather conditions, islands seem to be the most suitable habitat for pelican nesting. It is concluded that wildlife habitat management should integrate the ecological component, related to the needs of the species and ecosystem, with the social one, expressed by cooperation and involvement of the local community.KEY WORDS: Integrated management; Pelican; Nesting habitat; Habitat management; Reservoir-wetland; Public participation, Greece

  17. Research on website construction based on website group platform of Chengdu sport institution

    NASA Astrophysics Data System (ADS)

    Hu, Zunyu

    2018-04-01

    This paper describes the necessity of website construction based on the website group of Chengdu sport institute, and discusses the technical features of the website group, Based on the website group platform architecture, the key technologies such as Web Service, AJAX, RSS and other key technologies are used to realize the construction of the website. Based on the website group platform architecture of the site, it effectively solves the information isolated island between the sites, and realizes the information sharing and resource integration. It is also more convenient that site and other sites have composed of site group integrated operation and maintenance.

  18. Base (100-year) flood elevations for selected sites in Marion County, Missouri

    USGS Publications Warehouse

    Southard, Rodney E.; Wilson, Gary L.

    1998-01-01

    The primary requirement for community participation in the National Flood Insurance Program is the adoption and enforcement of floodplain management requirements that minimize the potential for flood damages to new construction and avoid aggravating existing flooding conditions. This report provides base flood elevations (BFE) for a 100-year recurrence flood for use in the management and regulation of 14 flood-hazard areas designated by the Federal Emergency Management Agency as approximate Zone A areas in Marion County, Missouri. The one-dimensional surface-water flow model, HEC-RAS, was used to compute the base (100-year) flood elevations for the 14 Zone A sites. The 14 sites were located at U.S., State, or County road crossings and the base flood elevation was determined at the upstream side of each crossing. The base (100-year) flood elevations for BFE 1, 2, and 3 on the South Fork North River near Monroe City, Missouri, are 627.7, 579.2, and 545.9 feet above sea level. The base (100-year) flood elevations for BFE 4, 5, 6, and 7 on the main stem of the North River near or at Philadelphia and Palmyra, Missouri, are 560.5, 539.7, 504.2, and 494.4 feet above sea level. BFE 8 is located on Big Branch near Philadelphia, a tributary to the North River, and the base (100-year) flood elevation at this site is 530.5 feet above sea level. One site (BFE 9) is located on the South River near Monroe City, Missouri. The base (100-year) flood elevation at this site is 619.1 feet above sea level. Site BFE 10 is located on Bear Creek near Hannibal, Missouri, and the base (100-year) elevation is 565.5 feet above sea level. The four remaining sites (BFE 11, 12, 13, and 14) are located on the South Fabius River near Philadelphia and Palmyra, Missouri. The base (100-year) flood elevations for BFE 11, 12, 13, and 14 are 591.2, 578.4, 538.7, and 506.9 feet above sea level.

  19. Distribution of materials in construction and demolition waste in Portugal.

    PubMed

    Coelho, André; de Brito, Jorge

    2011-08-01

    It may not be enough simply to know the global volume of construction and demolition waste (CDW) generated in a certain region or country if one wants to estimate, for instance, the revenue accruing from separating several types of materials from the input entering a given CDW recycling plant. A more detailed determination of the distribution of the materials within the generated CDW is needed and the present paper addresses this issue, distinguishing different buildings and types of operation (new construction, retrofitting and demolition). This has been achieved by measuring the materials from buildings of different ages within the Portuguese building stock, and by using direct data from demolition/retrofitting sites and new construction average values reported in the literature. An attempt to establish a benchmark with other countries is also presented. This knowledge may also benefit industry management, especially that related to CDW recycling, helping to optimize procedures, equipment size and operation and even industrial plant spatial distribution. In an extremely competitive market, where as in Portugal low-tech and high environmental impact procedures remain the norm in the construction industry (in particular, the construction waste industry), the introduction of a successful recycling industry is only possible with highly optimized processes and based on a knowledge-based approach to problems.

  20. SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants

    PubMed Central

    Memon, Aftab Hameed; Rahman, Ismail Abdul

    2014-01-01

    This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227

  1. SEM-PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: perspective of clients and consultants.

    PubMed

    Memon, Aftab Hameed; Rahman, Ismail Abdul

    2014-01-01

    This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.

  2. A case of laryngeal cancer induced by exposure to asbestos in a construction site supervisor.

    PubMed

    Roh, Sooyong; Park, Soyong; Tae, Gyeong; Song, Jaechul

    2016-01-01

    Construction site supervisors are exposed to many chemicals, dusts, and metals including asbestos. Asbestos is a hazardous chemical that is carcinogenic. Laryngeal cancer is not a rare disease in Korea. The most common causes of this disease are tobacco and alcohol, and representative occupational cause is asbestos. However, up to now, no case of laryngeal cancer induced by asbestos has been reported in Korea. In this study, we report such a case in a construction site supervisor. A 60-year-old man who had been experiencing hoarseness for 2 months was diagnosed with laryngeal cancer. The pathologic diagnosis was squamous cell carcinoma in situ, based on examination of a biopsy specimen obtained by resection of the lesion. The patient had been exposed to asbestos for 38 years at construction sites where he worked until diagnosed with laryngeal cancer. He had been exposed to asbestos when demolishing buildings and inspecting materials. The patient in this case worked with construction materials including asbestos and supervised construction for 38 years, and was thus exposed to asbestos at construction sites. Much of the asbestos was highly concentrated especially during demolition processes. We therefore consider the laryngeal cancer of this patient to be a work-related disease.

  3. A Solid Foundation: Key Capacities of Construction Pre-Apprenticeship Programs

    ERIC Educational Resources Information Center

    Helmer, Matt; Blair, Amy; Gerber, Allison

    2012-01-01

    This publication shares research from site visits conducted to construction pre-apprenticeship programs in Baltimore, Hartford, Milwaukee and Portland (OR). Findings from the site visits, which included interviews and focus groups with pre-apprenticeship program staff, public officials, philanthropic leaders, construction industry leaders and…

  4. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatmentmore » technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.« less

  5. Methods for preventing ASR in new construction: results of field exposure sites.

    DOT National Transportation Integrated Search

    2013-12-01

    As part of the FHWA ASR Development and Deployment Program, two sites were built to study ASR in new concrete construction. Concrete blocks were produced with a range of aggregates and cementitious materials and placed on outdoor exposure sites at th...

  6. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  7. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  8. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  9. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  10. Beyond the material grave: Life Cycle Impact Assessment of leaching from secondary materials in road and earth constructions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwab, Oliver; Karlsruhe Institute of Technology, Institute for Geography and Geoecology, Adenauerring 20, 76131 Karlsruhe; Bayer, Peter, E-mail: bayer@erdw.ethz.ch

    Highlights: • We model environmental impacts of leaching from secondary construction material. • Industrial wastes in construction contain up to 45,000 t heavy metals per year (D). • In a scenario, 150 t are leached to the environment within 100 years after construction. • All heavy metals but As, Sb and Mo are adsorbed by 20 cm subsoil in this scenario. • Environmental impacts depend on material, pollutant, construction type, and geography. - Abstract: In industrialized countries, large amounts of mineral wastes are produced. They are re-used in various ways, particularly in road and earth constructions, substituting primary resources suchmore » as gravel. However, they may also contain pollutants, such as heavy metals, which may be leached to the groundwater. The toxic impacts of these emissions are so far often neglected within Life Cycle Assessments (LCA) of products or waste treatment services and thus, potentially large environmental impacts are currently missed. This study aims at closing this gap by assessing the ecotoxic impacts of heavy metal leaching from industrial mineral wastes in road and earth constructions. The flows of metals such as Sb, As, Pb, Cd, Cr, Cu, Mo, Ni, V and Zn originating from three typical constructions to the environment are quantified, their fate in the environment is assessed and potential ecotoxic effects evaluated. For our reference country, Germany, the industrial wastes that are applied as Granular Secondary Construction Material (GSCM) carry more than 45,000 t of diverse heavy metals per year. Depending on the material quality and construction type applied, up to 150 t of heavy metals may leach to the environment within the first 100 years after construction. Heavy metal retardation in subsoil can potentially reduce the fate to groundwater by up to 100%. One major challenge of integrating leaching from constructions into macro-scale LCA frameworks is the high variability in micro-scale technical and geographical factors, such as material qualities, construction types and soil types. In our work, we consider a broad range of parameter values in the modeling of leaching and fate. This allows distinguishing between the impacts of various road constructions, as well as sites with different soil properties. The findings of this study promote the quantitative consideration of environmental impacts of long-term leaching in Life Cycle Assessment, complementing site-specific risk assessment, for the design of waste management strategies, particularly in the construction sector.« less

  11. Evolutionary Game Model Study of Construction Green Supply Chain Management under the Government Intervention

    NASA Astrophysics Data System (ADS)

    Xing, Yuanzhi; Deng, Xiaoyi

    2017-11-01

    The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.

  12. Cairo consensus on the IVF laboratory environment and air quality: report of an expert meeting.

    PubMed

    Mortimer, D; Cohen, J; Mortimer, S T; Fawzy, M; McCulloh, D H; Morbeck, D E; Pollet-Villard, X; Mansour, R T; Brison, D R; Doshi, A; Harper, J C; Swain, J E; Gilligan, A V

    2018-03-02

    This proceedings report presents the outcomes from an international Expert Meeting to establish a consensus on the recommended technical and operational requirements for air quality within modern assisted reproduction technology (ART) laboratories. Topics considered included design and construction of the facility, as well as its heating, ventilation and air conditioning system; control of particulates, micro-organisms (bacteria, fungi and viruses) and volatile organic compounds (VOCs) within critical areas; safe cleaning practices; operational practices to optimize air quality while minimizing physicochemical risks to gametes and embryos (temperature control versus air flow); and appropriate infection-control practices that minimize exposure to VOC. More than 50 consensus points were established under the general headings of assessing site suitability, basic design criteria for new construction, and laboratory commissioning and ongoing VOC management. These consensus points should be considered as aspirational benchmarks for existing ART laboratories, and as guidelines for the construction of new ART laboratories. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  13. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-12-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  14. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-02-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  15. Reuse of industrial sludge as construction aggregates.

    PubMed

    Tay, J H; Show, K Y; Hong, S Y

    2001-01-01

    Industrial wastewater sludge and dredged marine clay are high volume wastes that needed enormous space at landfill disposal sites. Due to the limitation of land space, there is an urgent need for alternative disposal methods for these two wastes. This study investigates the possibility of using the industrial sludge in combination with marine clay as construction aggregates. Different proportions of sludge and clay were made into round and angular aggregates. It was found that certain mix proportions could provide aggregates of adequate strength, comparable to that of conventional aggregates. Concrete samples cast from the sludge-clay aggregates yield compressive strengths in the range of 31.0 to 39.0 N/mm2. The results showed that the round aggregates of 100% sludge and the crush aggregates of sludge with up to 20% clay produced concrete of compressive strengths which are superior to that of 38.0 N/mm2 for conventional aggregate. The study indicates that the conversion of high volume wastes into construction materials is a potential option for waste management.

  16. Women's Construction of Embodiment and the Abject Sexual Body After Cancer.

    PubMed

    Parton, Chloe M; Ussher, Jane M; Perz, Janette

    2016-03-01

    Cancer and cancer treatments can cause significant changes to women's sexual well-being. We explored how women construct a sense of their bodies and sexual "selves" in the context of cancer. Sixteen women, across a range of ages (20-71 years), cancer types, and cancer stages, took part in in-depth semistructured interviews. We conducted a thematic discourse analysis, drawing on feminist poststructuralist theory, identifying "the abject body" as a dominant theme. Participants constructed abject bodies as being "beyond abnormality," "outside idealized discourses of embodied femininity," and "out of control." The women's accounts varied in management and resistance of the abject body discourse, through bodily practices of concealment, resisting discourses of feminine beauty, and repositioning the body as a site of personal transformation. The corporeality of the cancerous body can be seen to disrupt hegemonic discourses of femininity and sexuality, with implications for how women practice and make meaning of embodied sexual subjectivity. © The Author(s) 2015.

  17. Information systems for material flow management in construction processes

    NASA Astrophysics Data System (ADS)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  18. Mapping Of Construction Waste Illegal Dumping Using Geographical Information System (GIS)

    NASA Astrophysics Data System (ADS)

    Zainun, Noor Yasmin; Rahman, Ismail Abdul; Azwana Rothman, Rosfazreen

    2016-11-01

    Illegal dumping of solid waste not only affecting the environment but also social life of communities, hence authorities should have an effective system to cater this problem. Malaysia is experiencing extensive physical developments and this has led to an increase of construction waste illegal dumping. However, due to the lack of proper data collection, the actual figure for construction waste illegal dumping in Malaysia are not available. This paper presents a mapping of construction waste illegal dumping in Kluang district, Johor using Geographic Information System (GIS) software. Information of the dumped waste such as coordinate, photos, types of material and quantity of waste were gathered manually through site observation for three months period. For quantifying the dumped waste, two methods were used which are the first method is based on shape of the waste (pyramids or squares) while the second method is based weighing approach. All information regarding the waste was assigned to the GIS for the mapping process. Results indicated a total of 12 types of construction waste which are concrete, tiles, wood, gypsum board, mixed construction waste, brick and concrete, bricks, sand, iron, glass, pavement and tiles, and concrete at 64 points locations of illegal dumping on construction waste in Kluang. These wastes were accounted to an estimated volume of 427.2636 m3. Hopefully, this established map will assist Kluang authority to improve their solid waste management system in Kluang.

  19. A study of the effects of implementing agricultural best management practices and in-stream restoration on suspended sediment, stream habitat, and benthic macroinvertebrates at three stream sites in Surry County, North Carolina, 2004-2007-Lessons learned

    USGS Publications Warehouse

    Smith, Douglas G.; Ferrell, G.M.; Harned, Douglas A.; Cuffney, Thomas F.

    2011-01-01

    The effects of agricultural best management practices and in-stream restoration on suspended-sediment concentrations, stream habitat, and benthic macroinvertebrate assemblages were examined in a comparative study of three small, rural stream basins in the Piedmont and Blue Ridge Physiographic Provinces of North Carolina and Virginia between 2004 and 2007. The study was designed to assess changes in stream quality associated with stream-improvement efforts at two sites in comparison to a control site (Hogan Creek), for which no improvements were planned. In the drainage basin of one of the stream-improvement sites (Bull Creek), several agricultural best management practices, primarily designed to limit cattle access to streams, were implemented during this study. In the drainage basin of the second stream-improvement site (Pauls Creek), a 1,600-foot reach of the stream channel was restored and several agricultural best management practices were implemented. Streamflow conditions in the vicinity of the study area were similar to or less than the long-term annual mean streamflows during the study. Precipitation during the study period also was less than normal, and the geographic distribution of precipitation indicated drier conditions in the southern part of the study area than in the northern part. Dry conditions during much of the study limited opportunities for acquiring high-flow sediment samples and streamflow measurements. Suspended-sediment yields for the three basins were compared to yield estimates for streams in the southeastern United States. Concentrations of suspended sediment and nutrients in samples from Bull Creek, the site where best management practices were implemented, were high compared to the other two sites. No statistically significant change in suspended-sediment concentrations occurred at the Bull Creek site following implementation of best management practices. However, data collected before and after channel stabilization at the Pauls Creek site indicated a statistically significant (p<0.05) decrease in suspended-sediment discharge following in-stream restoration. Stream habitat characteristics were similar at the Bull Creek and Hogan Creek reaches. However, the Pauls Creek reach was distinguished from the other two sites by a lack of pools, greater bankfull widths, greater streamflow and velocity, and larger basin size. Historical changes in the stream channel in the vicinity of the Pauls Creek streamgage are evident in aerial photographs dating from 1936 to 2005 and could have contributed to stream-channel instability. The duration of this study likely was inadequate for detecting changes in stream habitat characteristics. Benthic macroinvertebrate assemblages differed by site and changed during the course of the study. Bull Creek, the best management practices site, stood out as the site having the poorest overall conditions and the greatest improvement in benthic macroinvertebrate communities during the study period. Richness and diversity metrics indicated that benthic macroinvertebrate community conditions at the Hogan Creek and Pauls Creek sites declined during the study, although the status was excellent based on the North Carolina Index of Biotic Integrity. Experiences encountered during this study exemplify the difficulties of attempting to assess the short-term effects of stream-improvement efforts on a watershed scale and, in particular, the difficulty of finding similar basins for a comparative study. Data interpretation was complicated by dry climatic conditions and unanticipated land disturbances that occurred during the study in each of the three study basins. For example, agricultural best management practices were implemented in the drainage basin of the control site prior to and during the study. An impoundment on Bull Creek upstream from the streamgaging station probably influenced water-quality conditions and streamflow. Road construction in the vicinity of the Pauls Creek site potentially masked changes related to stream-improvement efforts. In addition, stream-improvement activities occurred in each of the three study basins over a period of several years prior to and during the study so that there were no discrete before and after periods available for meaningful comparisons. Historical and current land-use activities in each of the three study basins likely affected observed stream conditions. The duration of this study probably was insufficient to detect changes associated with agricultural best management practices and stream-channel restoration.

  20. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  1. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  2. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  3. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  4. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS FOR THE DESIGN AND CONSTRUCTION OF NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL...

  5. Roads and Airfields I (Programed Instruction). Engineer Subcourse 64-9.

    ERIC Educational Resources Information Center

    Army Engineer School, Fort Belvoir, VA.

    The document is a programed text for a correspondence course in the planning, construction, and maintenance of military roads and airfields. There are seven lessons: construction requirements and design criteria; road reconnaissance and site selection; airfield reconnaissance and site selection; layout procedures, construction staking, and field…

  6. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS FOR THE DESIGN AND CONSTRUCTION OF NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL...

  7. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  8. Using Construction Management for Public and Institutional Facilities.

    ERIC Educational Resources Information Center

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  9. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    NASA Astrophysics Data System (ADS)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  10. Integral stormwater management master plan and design in an ecological community.

    PubMed

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  11. Agricultural ponds support amphibian populations

    USGS Publications Warehouse

    Knutson, M.G.; Richardson, W.B.; Reineke, D.M.; Gray, B.R.; Parmelee, J.R.; Weick, S.E.

    2004-01-01

    In some agricultural regions, natural wetlands are scarce, and constructed agricultural ponds may represent important alternative breeding habitats for amphibians. Properly managed, these agricultural ponds may effectively increase the total amount of breeding habitat and help to sustain populations. We studied small, constructed agricultural ponds in southeastern Minnesota to assess their value as amphibian breeding sites. Our study examined habitat factors associated with amphibian reproduction at two spatial scales: the pond and the landscape surrounding the pond. We found that small agricultural ponds in southeastern Minnesota provided breeding habitat for at least 10 species of amphibians. Species richness and multispecies reproductive success were more closely associated with characteristics of the pond (water quality, vegetation, and predators) compared with characteristics of the surrounding landscape, but individual species were associated with both pond and landscape variables. Ponds surrounded by row crops had similar species richness and reproductive success compared with natural wetlands and ponds surrounded by nongrazed pasture. Ponds used for watering livestock had elevated concentrations of phosphorus, higher turbidity, and a trend toward reduced amphibian reproductive success. Species richness was highest in small ponds, ponds with lower total nitrogen concentrations, tiger salamanders (Ambystoma tigrinum) present, and lacking fish. Multispecies reproductive success was best in ponds with lower total nitrogen concentrations, less emergent vegetation, and lacking fish. Habitat factors associated with higher reproductive success varied among individual species. We conclude that small, constructed farm ponds, properly managed, may help sustain amphibian populations in landscapes where natural wetland habitat is rare. We recommend management actions such as limiting livestock access to the pond to improve water quality, reducing nitrogen input, and avoiding the introduction of fish.

  12. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    ERIC Educational Resources Information Center

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  13. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  14. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  15. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  16. Environmental projects, volume 10. Environmental assessment: New 34-meter antenna at Apollo site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.

  17. Multilevel Safety Climate and Safety Performance in the Construction Industry: Development and Validation of a Top-Down Mechanism

    PubMed Central

    Gao, Ran; Chan, Albert P.C.; Utama, Wahyudi P.; Zahoor, Hafiz

    2016-01-01

    The character of construction projects exposes front-line workers to dangers and accidents. Safety climate has been confirmed to be a predictor of safety performance in the construction industry. This study aims to explore the underlying mechanisms of the relationship between multilevel safety climate and safety performance. An integrated model was developed to study how particular safety climate factors of one level affect those of other levels, and then affect safety performance from the top down. A questionnaire survey was administered on six construction sites in Vietnam. A total of 1030 valid questionnaires were collected from this survey. Approximately half of the data were used to conduct exploratory factor analysis (EFA) and the remaining data were submitted to structural equation modeling (SEM). Top management commitment (TMC) and supervisors’ expectation (SE) were identified as factors to represent organizational safety climate (OSC) and supervisor safety climate (SSC), respectively, and coworkers’ caring and communication (CCC) and coworkers’ role models (CRM) were identified as factors to denote coworker safety climate (CSC). SEM results show that OSC factor is positively related to SSC factor and CSC factors significantly. SSC factor could partially mediate the relationship between OSC factor and CSC factors, as well as the relationship between OSC factor and safety performance. CSC factors partially mediate the relationship between OSC factor and safety performance, and the relationship between SSC factor and safety performance. The findings imply that a positive safety culture should be established both at the organizational level and the group level. Efforts from all top management, supervisors, and coworkers should be provided to improve safety performance in the construction industry. PMID:27834823

  18. Multilevel Safety Climate and Safety Performance in the Construction Industry: Development and Validation of a Top-Down Mechanism.

    PubMed

    Gao, Ran; Chan, Albert P C; Utama, Wahyudi P; Zahoor, Hafiz

    2016-11-08

    The character of construction projects exposes front-line workers to dangers and accidents. Safety climate has been confirmed to be a predictor of safety performance in the construction industry. This study aims to explore the underlying mechanisms of the relationship between multilevel safety climate and safety performance. An integrated model was developed to study how particular safety climate factors of one level affect those of other levels, and then affect safety performance from the top down. A questionnaire survey was administered on six construction sites in Vietnam. A total of 1030 valid questionnaires were collected from this survey. Approximately half of the data were used to conduct exploratory factor analysis (EFA) and the remaining data were submitted to structural equation modeling (SEM). Top management commitment (TMC) and supervisors' expectation (SE) were identified as factors to represent organizational safety climate (OSC) and supervisor safety climate (SSC), respectively, and coworkers' caring and communication (CCC) and coworkers' role models (CRM) were identified as factors to denote coworker safety climate (CSC). SEM results show that OSC factor is positively related to SSC factor and CSC factors significantly. SSC factor could partially mediate the relationship between OSC factor and CSC factors, as well as the relationship between OSC factor and safety performance. CSC factors partially mediate the relationship between OSC factor and safety performance, and the relationship between SSC factor and safety performance. The findings imply that a positive safety culture should be established both at the organizational level and the group level. Efforts from all top management, supervisors, and coworkers should be provided to improve safety performance in the construction industry.

  19. Laboratory information management system for membrane protein structure initiative--from gene to crystal.

    PubMed

    Troshin, Petr V; Morris, Chris; Prince, Stephen M; Papiz, Miroslav Z

    2008-12-01

    Membrane Protein Structure Initiative (MPSI) exploits laboratory competencies to work collaboratively and distribute work among the different sites. This is possible as protein structure determination requires a series of steps, starting with target selection, through cloning, expression, purification, crystallization and finally structure determination. Distributed sites create a unique set of challenges for integrating and passing on information on the progress of targets. This role is played by the Protein Information Management System (PIMS), which is a laboratory information management system (LIMS), serving as a hub for MPSI, allowing collaborative structural proteomics to be carried out in a distributed fashion. It holds key information on the progress of cloning, expression, purification and crystallization of proteins. PIMS is employed to track the status of protein targets and to manage constructs, primers, experiments, protocols, sample locations and their detailed histories: thus playing a key role in MPSI data exchange. It also serves as the centre of a federation of interoperable information resources such as local laboratory information systems and international archival resources, like PDB or NCBI. During the challenging task of PIMS integration, within the MPSI, we discovered a number of prerequisites for successful PIMS integration. In this article we share our experiences and provide invaluable insights into the process of LIMS adaptation. This information should be of interest to partners who are thinking about using LIMS as a data centre for their collaborative efforts.

  20. Life-threatening methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite in the construction sites.

    PubMed

    Sohn, C H; Seo, D W; Ryoo, S M; Lee, J H; Kim, W Y; Lim, K S; Oh, B J

    2014-01-01

    Construction workers are exposed to a wide variety of health hazards such as poisoning at the construction sites. Various forms of poisoning incidents in construction workers have been reported. However, studies on methemoglobinemia caused by unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites have not been reported yet. The aim of this study was to evaluate life-threatening methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites and describe similar incidents involving ingestion of antifreeze admixtures in Korea. Retrospective observational case series study on patients with methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite admitted to the emergency department (ED) from January 1, 2010 to December 31, 2012 and cases reported to the Korea Occupational Safety and Health Agency (KOSHA) was performed. Results. Six victims were admitted to our ED. They had methemoglobin levels ranging from 32.4% to 71.5% and all of them recovered after receiving one (2 mg/kg) or two doses infusion of methylene blue. From the data of the KOSHA, six incidents that caused 27 victims were identified. Of 27 victims, five were included in the ED cases. For all incidents, antifreeze admixtures were not contained in their original containers and all new containers did not have a new label. All workers mistook antifreeze admixtures for water. Among the 28 victims included in this study, four died. Unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites can cause life-threatening methemoglobinemia. There is a need to store and label potentially hazardous materials properly to avoid unintentional ingestion at the construction sites.

Top