Sample records for construction sites

  1. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  2. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  3. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  4. 10 CFR 36.15 - Start of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...

  5. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  6. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  7. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    DOT National Transportation Integrated Search

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  8. A before-after control-impact assessment to understand the potential impacts of highway construction noise and activity on an endangered songbird.

    PubMed

    Long, Ashley M; Colón, Melanie R; Bosman, Jessica L; Robinson, Dianne H; Pruett, Hannah L; McFarland, Tiffany M; Mathewson, Heather A; Szewczak, Joseph M; Newnam, J Cal; Morrison, Michael L

    2017-01-01

    Anthropogenic noise associated with highway construction and operation can have individual- and population-level consequences for wildlife (e.g., reduced densities, decreased reproductive success, behavioral changes). We used a before-after control-impact study design to examine the potential impacts of highway construction and traffic noise on endangered golden-cheeked warblers ( Setophaga chrysoparia ; hereafter warbler) in urban Texas. We mapped and monitored warbler territories before (2009-2011), during (2012-2013), and after (2014) highway construction at three study sites: a treatment site exposed to highway construction and traffic noise, a control site exposed only to traffic noise, and a second control site exposed to neither highway construction or traffic noise. We measured noise levels at varying distances from the highway at sites exposed to construction and traffic noise. We examined how highway construction and traffic noise influenced warbler territory density, territory placement, productivity, and song characteristics. In addition, we conducted a playback experiment within study sites to evaluate acute behavioral responses to highway construction noises. Noise decreased with increasing distance from the highways. However, noise did not differ between the construction and traffic noise sites or across time. Warbler territory density increased over time at all study sites, and we found no differences in warbler territory placement, productivity, behavior, or song characteristics that we can attribute to highway construction or traffic noise. As such, we found no evidence to suggest that highway construction or traffic noise had a negative effect on warblers during our study. Because human population growth will require recurring improvements to transportation infrastructure, understanding wildlife responses to anthropogenic noise associated with the construction and operation of roads is essential for effective management and recovery of prioritized species.

  9. Effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County, northeast Kansas, February 2006 through November 2008

    USGS Publications Warehouse

    Lee, Casey J.; Ziegler, Andrew C.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the Johnson County, Kansas, Stormwater Management Program, investigated the effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County from February 2006 through November 2008. Streamgages and continuous turbidity sensors were operated at 15 sites within the urbanizing 57-square-mile Mill Creek Basin, and 4 sites downstream from the other largest basins (49 to 66 square miles) in Johnson County. The largest sediment yields in Johnson County were observed downstream from basins with increased construction activity. Sediment yields attributed to the largest (68 acre) active construction site in the study area were 9,300 tons per square mile in 2007 and 12,200 tons per square mile in 2008; 5 to 55 times larger than yields observed at other sampling sites. However, given erodible soils and steep slopes at this site, sediment yields were relatively small compared to the range in historic values from construction sites without erosion and sediment controls in the United States (2,300 to 140,000 tons per square mile). Downstream from this construction site, a sediment forebay and wetland were constructed in series upstream from Shawnee Mission Lake, a 120-acre reservoir within Shawnee Mission Park. Although the original intent of the sediment forebay and constructed wetland were unrelated to upstream construction, they were nonetheless evaluated in 2008 to characterize sediment removal before stream entry into the lake. The sediment forebay was estimated to reduce 33 percent of sediment transported to the lake, whereas the wetland did not appear to decrease downstream sediment transport. Comparisons of time-series data and relations between turbidity and sediment concentration indicate that larger silt-sized particles were deposited within the sediment forebay, whereas smaller silt and clay-sized sediments were transported through the wetland and into the lake. Data collected at sites up and downstream from the constructed wetland indicated that hydraulic retention alone did not substantially reduce sediment loading to Shawnee Mission Lake. Mean-daily turbidity values at sampling sites downstream from basins with increased construction activity were compared to U.S. Environmental Protection Agency turbidity criteria designed to reduce discharge of pollutants from construction sites. The U.S. Environmental Protection Agency numeric turbidity criteria specifies that effluent from construction sites greater than 20 acres not exceed a mean-daily turbidity value of 280 nephelometric turbidity units beginning in 2011; this criteria will apply to sites greater than 10 acres beginning in 2014. Although numeric criteria would not have been applicable to data from sampling sites in Johnson County because they were not directly downstream from construction sites and because individual states still have to determine additional details as to how this criteria will be enforced, comparisons were made to characterize the potential of construction site effluent in Johnson County to exceed U.S. Environmental Protection Agency Criteria, even under extensive erosion and sediment controls. Numeric criteria were exceeded at sampling sites downstream from basins with increased construction activity for multiple days during the study period, potentially indicating the need for additional erosion and sediment controls and (or) treatment to bring discharges from construction sites into compliance with future numeric turbidity criteria. Among sampling sites in the Mill Creek Basin, sediment yields from the urbanizing Clear Creek Basin were approximately 2 to 3 times those from older, more stable urban or rural basins. Sediments eroded from construction sites adjacent to or surrounding streams appear to be more readily transported downstream, whereas sediments eroded from construction sites in headwater areas are more likely to

  10. 10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... average megawatts or more over a 12 month period. This applies to power marketing operations and to siting... Systems D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities D3. Siting/construction/operation/decommissioning of uranium enrichment facilities D4. Siting/construction...

  11. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  12. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  13. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  14. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  15. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  16. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    DOT National Transportation Integrated Search

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  17. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  18. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  19. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  20. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  1. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPFmore » site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).« less

  2. Design of turbidity controls for Oklahoma highway construction.

    DOT National Transportation Integrated Search

    2013-03-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...

  3. The Differing Site Conditions Clause: Time for a Change

    DTIC Science & Technology

    1990-09-30

    the character provided for in the contract. The provision of the standard construction contract utilized by agencies of the Federal Government which...unanticipated conditions otherwise attendant upon the performance of construction work.’ Differing site conditions pose a major concern to all I McNulty, "Changed...Conditions (Differing Site Conditions) and Misrepresentations Under Government Construction Contracts" in Construction Contract Changes, Changed

  4. Assessment of karst activity at highway construction sites using the electrical resistivity method (Greene and Jefferson Counties, Missouri).

    DOT National Transportation Integrated Search

    2006-11-01

    Two-dimensional (2-D) electrical resistivity data were acquired across and in proximity to active sinkholes at two Missouri : Department of Transportation (MoDOT) highway-construction sites. Construction site #1 is located in Greene County, Missouri;...

  5. 48 CFR 49.105-4 - Cleanup of construction site.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cleanup of construction site. 49.105-4 Section 49.105-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105-4 Cleanup of construction site. In...

  6. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  7. Critical management practices influencing on-site waste minimization in construction projects.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  9. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  10. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  11. 75 FR 879 - National Semiconductor Corporation Arlington Manufacturing Site Including On-Site Leased Workers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... Foods, Allied Barton Security, ASIL, ASML and Construction Mechanical Systems Arlington, TX; Amended... leased workers from ASML and Construction Mechanical Systems were employed on-site at the Arlington... Department is amending the certification to include workers leased from ASML and Construction Mechanical...

  12. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects

    NASA Astrophysics Data System (ADS)

    Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui

    2010-06-01

    The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.

  13. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    PubMed

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  14. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  15. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  16. Fall hazard control observed on residential construction sites.

    PubMed

    Kaskutas, Vicki; Dale, Ann Marie; Nolan, James; Patterson, Dennis; Lipscomb, Hester J; Evanoff, Bradley

    2009-06-01

    Falls are a leading cause of mortality and morbidity in the construction industry. This study measured fall hazards at residential construction sites. Trained carpenters administered the St. Louis Audit of Fall Risks and interviewed carpenters. The prevalence of fall prevention practices meeting safety criteria was counted and correlations explored. We identified a high prevalence of fall hazards at the 197 residential sites audited. Roof sheathing met safety criteria most consistently (81%) and truss setting least consistently (28%). Use of personal fall arrest and monitoring of unguarded floor openings were rare. Safer performance on several scales was correlated. Construction sites of large-sized contractors were generally safer than smaller contractors. Apprentice carpenters were less familiar with their employers' fall prevention plan than experienced workers. Safety could be improved with consistent use of recognized fall prevention practices at residential construction sites.

  17. E-consult implementation: lessons learned using consolidated framework for implementation research.

    PubMed

    Haverhals, Leah M; Sayre, George; Helfrich, Christian D; Battaglia, Catherine; Aron, David; Stevenson, Lauren D; Kirsh, Susan; Ho, Michael; Lowery, Julie

    2015-12-01

    In 2011, the Veterans Health Administration (VHA) implemented electronic consults (e-consults) as an alternative to in-person specialty visits to improve access and reduce travel for veterans. We conducted an evaluation to understand variation in the use of the new e-consult mechanism and the causes of variable implementation, guided by the Consolidated Framework for Implementation Research (CFIR). Qualitative case studies of 3 high- and 5 low-implementation e-consult pilot sites. Participants included e-consult site leaders, primary care providers, specialists, and support staff identified using a modified snowball sample. We used a 3-step approach, with a structured survey of e-consult site leaders to identify key constructs, based on the CFIR. We then conducted open-ended interviews, focused on key constructs, with all participants. Finally, we produced structured, site-level ratings of CFIR constructs and compared them between high- and low-implementation sites. Site leaders identified 14 initial constructs. We conducted 37 interviews, from which 4 CFIR constructs distinguished high implementation e-consult sites: compatibility, networks and communications, training, and access to knowledge and information. For example, illustrating compatibility, a specialist at a high-implementation site reported that the site changed the order of consult options so that all specialties listed e-consults first to maintain consistency. High-implementation sites also exhibited greater agreement on constructs. By using the CFIR to analyze results, we facilitate future synthesis with other findings, and we better identify common patterns of implementation determinants common across settings.

  18. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  19. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    EPA Pesticide Factsheets

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  20. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    PubMed Central

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite. PMID:25830069

  1. Integrating building information modeling and health and safety for onsite construction.

    PubMed

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  2. Mental Constructions and Constructions of Web Sites: Learner and Teacher Points of View

    ERIC Educational Resources Information Center

    Hazzan, Orit

    2004-01-01

    This research focuses on knowledge and ways in which knowledge may be constructed in the learner's mind. Specifically, it addresses the Web as a cognitive supporter for learning, organising and constructing a new domain of knowledge. In particular, the research analyses student reflection on constructing web sites. The analysis is based on an…

  3. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  4. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  5. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  6. Measuring Air Quality in a Construction Site Biotope Using the AQM-65 Analyser

    NASA Astrophysics Data System (ADS)

    Ioana-Alina, Creţan; Nicoleta, Nemeș

    2017-10-01

    Activities related to the execution of construction works often exert pressure on the quality of environmental factors in adjacent habitat. In various stages of realization of the works if is the opening of the building site and access roads, borrow pits and the storage, or the construction itself, all the related activities will cause harm in various degrees of vegetation on the construction site and its surroundings. Large areas are rendered non-productive and, although they should be restored for use in the same place or elsewhere, sometimes they can lose their natural habitat baseline. The paper is presenting a case study of air quality monitoring using the AQM 65 analyser for a construction site located near Timisoara locality, Timis County, Romania.

  7. [Ecological risk assessment of dam construction for terrestrial plant species in middle reach of Lancangjiang River, Southwest China].

    PubMed

    Li, Xiao-Yan; Dong, Shi-Kui; Liu, Shi-Liang; Peng, Ming-Chun; Li, Jin-Peng; Zhao, Qing-He; Zhang, Zhao-Ling

    2012-08-01

    Taking the surrounding areas of Xiaowan Reservoir in the middle reach of Lancangjiang River as study area, and based on the vegetation investigation at three sites including electricity transmission area (site 1), electricity-transfer substation and roadsides to the substation (site 2), and emigration area (site 3) in 1997 (before dam construction), another investigation was conducted on the vegetation composition, plant coverage, and dominant species at the same sites in 2010 (after dam construction), aimed to evaluate the ecological risk of the dam construction for the terrestrial plant species in middle reach of Lancangjiang River. There was an obvious difference in the summed dominance ratio of dominant species at the three sites before and after the dam construction. According the types of species (dominant and non-dominant species) and the changes of plant dominance, the ecological risk (ER) for the plant species was categorized into 0 to IV, i.e., no or extremely low ecological risk (0), low ecological risk (I), medium ecological risk (II), high ecological risk (III), and extremely high ecological risk (IV). As affected by the dam construction, the majority of the species were at ER III, and a few species were at ER IV. The percentage of the plant species at ER III and ER IV at site 3 was higher than that at sites 1 and 2. The decrease or loss of native plants and the increase of alien or invasive plants were the major ecological risks caused by the dam construction. Effective protection strategies should be adopted to mitigate the ecological risk of the dam construction for the terrestrial plants at species level.

  8. Participatory Training to Improve Safety and Health in Small Construction Sites in Some Countries in Asia: Development and Application of the WISCON Training Program.

    PubMed

    Kawakami, Tsuyoshi

    2016-08-01

    A participatory training program, Work Improvement in Small Construction Sites, was developed to provide practical support measures to the small construction sector. Managers and workers from selected small sites were interviewed about their occupational safety and health risks. The Work Improvement in Small Construction Sites training program comprised a 45-item action checklist, photos, and illustrations showing local examples and group work methods. Pilot training workshops were carried out with workers and employers in Cambodia, Laos, Mongolia, Thailand, and Vietnam. Participants subsequently planned, and using locally available low-cost materials, implemented their own improvements such as hand-made hand trucks to carry heavy materials, removal of projecting nails from timber materials, and fences to protect roof workers from falling. Local Work Improvement in Small Construction Sites trainers consisting of government officials, workers, employers, and nongovernment organization representatives were then trained to implement the Work Improvement in Small Construction Sites training widely. Keys to success were easy-to-apply training tools aiming at immediate, low-cost improvements, and collaboration with various local people's networks. © The Author(s) 2016.

  9. 54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, AND CONSTRUCTION OF EMBANKMENT FOR RAILROAD SPUR. c.1898 (AKZO No. A-3) - Avery Island Salt Works, Akzo Salt Incorporated, Avery Island, Iberia Parish, LA

  10. Stream Phosphorus Dynamics Along a Suburbanizing Gradient in Southern Ontario, Canada

    NASA Astrophysics Data System (ADS)

    Duval, T. P.

    2017-12-01

    While it is well known that urban streams are subject to impaired water quality relative to natural analogues, far less research has been directed at stream water quality during the process of (sub-) urbanization. This study determines the role of housing construction activities in Brampton, Canada on the concentration and flux of phosphorus (P) of a headwater stream. Prior to development the stream was engineered with a riffle-pool sequence, riparian plantings, and a floodplain corridor that was lined with sediment fencing. Stream sites were sampled daily over a period of six months at locations representing varying stages of subdivision completion (upper site -active construction; middle site -finished construction and natural vegetation; lower site -finished construction and active construction). A nearby urban stream site developed ten years prior to this study was selected as a reference site. There were no differences in total phosphorus (TP) levels or flux between the suburbanizing and urban streams; however, the forms of P differed between sites. The urban stream TP load was dominated by particulate phosphorus (PP) while suburbanizing stream P was mainly in the dissolved organic phosphorus (DOP) form. The importance of DOP to TP flux increased with the onset of the growing season. TP levels in all stream segments frequently exceeded provincial water quality guidelines during storm events but were generally low during baseflow conditions. During storm events PP and total suspended solid levels in the suburbanizing stream reached levels of the urban stream due to sediment fence failure at several locations along the construction-hillslope interface. Along the suburbanizing gradient, the hydrological connection to a mid-reach zone of no-construction activity / fallow field and native forest resulted in significantly lower P levels than the upper suburbanizing stream site. This suggests that stream channel design features as well as timing of construction activities and the hydrological connection between the stream and construction projects all contribute to downstream export of nutrients and ultimately stream water quality.

  11. Turbidity monitoring at select MDOT construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  12. Effects of organizational complexity and resources on construction site risk.

    PubMed

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  13. 226. Early construction on section 2A1. This was the site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    226. Early construction on section 2-A-1. This was the site of the first construction on the Blue Ride Parkway. - Blue Ridge Parkway, Between Shenandoah National Park & Great Smoky Mountains, Asheville, Buncombe County, NC

  14. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  15. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  16. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  17. Studies on Labour Safety in Construction Sites

    PubMed Central

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  18. Studies on Labour Safety in Construction Sites.

    PubMed

    Kanchana, S; Sivaprakash, P; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  19. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites.

    PubMed

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-03-08

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites.

  20. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    PubMed Central

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  1. Event-based soil loss models for construction sites

    NASA Astrophysics Data System (ADS)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  2. Protocol for a mixed-methods study on leader-based interventions in construction contractors' safety commitments.

    PubMed

    Pedersen, Betina Holbaek; Dyreborg, Johnny; Kines, Pete; Mikkelsen, Kim Lyngby; Hannerz, Harald; Andersen, Dorte Raaby; Spangenberg, Søren

    2010-06-01

    Owing to high injury rates, safety interventions are needed in the construction industry. Evidence-based interventions tailored to this industry are, however, scarce. Leader-based safety interventions have proven more effective than worker-based interventions in other industries. To test a leader-based safety intervention for construction sites. The intervention consists of encouraging safety coordinators to provide feedback on work safety to the client and line management. The intention is to increase communication and interactions regarding safety within the line management and between the client and the senior management. It is hypothesised that this, in turn, will lead to increased communication and interaction about safety between management and coworkers as well as an increased on-site safety level. A group-randomised double-blinded case study of six Danish construction sites (three intervention sites and three control sites). The recruitment of the construction sites is performed continuously from January 2010 to June 2010. The investigation of each site lasts 20 continuous weeks. Confirmatory statistical analysis is used to test if the safety level increased, and if the probability of safety communications between management and coworkers increases as a consequence of the intervention. The data collection will be blinded. Qualitative methods are used to evaluate if communication and interactions about safety at all managerial levels, including the client, increase. (1) The proportion of safety-related communications out of all studied communications between management and coworkers. (2) The safety level index of the construction sites.

  3. Research on website construction based on website group platform of Chengdu sport institution

    NASA Astrophysics Data System (ADS)

    Hu, Zunyu

    2018-04-01

    This paper describes the necessity of website construction based on the website group of Chengdu sport institute, and discusses the technical features of the website group, Based on the website group platform architecture, the key technologies such as Web Service, AJAX, RSS and other key technologies are used to realize the construction of the website. Based on the website group platform architecture of the site, it effectively solves the information isolated island between the sites, and realizes the information sharing and resource integration. It is also more convenient that site and other sites have composed of site group integrated operation and maintenance.

  4. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  5. Robust Classification and Segmentation of Planar and Linear Features for Construction Site Progress Monitoring and Structural Dimension Compliance Control

    NASA Astrophysics Data System (ADS)

    Maalek, R.; Lichti, D. D.; Ruwanpura, J.

    2015-08-01

    The application of terrestrial laser scanners (TLSs) on construction sites for automating construction progress monitoring and controlling structural dimension compliance is growing markedly. However, current research in construction management relies on the planned building information model (BIM) to assign the accumulated point clouds to their corresponding structural elements, which may not be reliable in cases where the dimensions of the as-built structure differ from those of the planned model and/or the planned model is not available with sufficient detail. In addition outliers exist in construction site datasets due to data artefacts caused by moving objects, occlusions and dust. In order to overcome the aforementioned limitations, a novel method for robust classification and segmentation of planar and linear features is proposed to reduce the effects of outliers present in the LiDAR data collected from construction sites. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a robust clustering method. A method is also proposed to robustly extract the points belonging to the flat-slab floors and/or ceilings without performing the aforementioned stages in order to preserve computational efficiency. The applicability of the proposed method is investigated in two scenarios, namely, a laboratory with 30 million points and an actual construction site with over 150 million points. The results obtained by the two experiments validate the suitability of the proposed method for robust segmentation of planar and linear features in contaminated datasets, such as those collected from construction sites.

  6. On the prevailing construction waste recycling practices: a South East Queensland study.

    PubMed

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  7. A case of laryngeal cancer induced by exposure to asbestos in a construction site supervisor.

    PubMed

    Roh, Sooyong; Park, Soyong; Tae, Gyeong; Song, Jaechul

    2016-01-01

    Construction site supervisors are exposed to many chemicals, dusts, and metals including asbestos. Asbestos is a hazardous chemical that is carcinogenic. Laryngeal cancer is not a rare disease in Korea. The most common causes of this disease are tobacco and alcohol, and representative occupational cause is asbestos. However, up to now, no case of laryngeal cancer induced by asbestos has been reported in Korea. In this study, we report such a case in a construction site supervisor. A 60-year-old man who had been experiencing hoarseness for 2 months was diagnosed with laryngeal cancer. The pathologic diagnosis was squamous cell carcinoma in situ, based on examination of a biopsy specimen obtained by resection of the lesion. The patient had been exposed to asbestos for 38 years at construction sites where he worked until diagnosed with laryngeal cancer. He had been exposed to asbestos when demolishing buildings and inspecting materials. The patient in this case worked with construction materials including asbestos and supervised construction for 38 years, and was thus exposed to asbestos at construction sites. Much of the asbestos was highly concentrated especially during demolition processes. We therefore consider the laryngeal cancer of this patient to be a work-related disease.

  8. A Solid Foundation: Key Capacities of Construction Pre-Apprenticeship Programs

    ERIC Educational Resources Information Center

    Helmer, Matt; Blair, Amy; Gerber, Allison

    2012-01-01

    This publication shares research from site visits conducted to construction pre-apprenticeship programs in Baltimore, Hartford, Milwaukee and Portland (OR). Findings from the site visits, which included interviews and focus groups with pre-apprenticeship program staff, public officials, philanthropic leaders, construction industry leaders and…

  9. Methods for preventing ASR in new construction: results of field exposure sites.

    DOT National Transportation Integrated Search

    2013-12-01

    As part of the FHWA ASR Development and Deployment Program, two sites were built to study ASR in new concrete construction. Concrete blocks were produced with a range of aggregates and cementitious materials and placed on outdoor exposure sites at th...

  10. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  11. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  12. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  13. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  14. Analysis of Material Handling Safety in Construction Sites and Countermeasures for Effective Enhancement

    PubMed Central

    Anil Kumar, C. N.; Sakthivel, M.; Elangovan, R. K.; Arularasu, M.

    2015-01-01

    One of many hazardous workplaces includes the construction sites as they involve several dangerous tasks. Many studies have revealed that material handling equipment is a major cause of accidents at these sites. Though safety measures are being followed and monitored continuously, accident rates are still high as either workers are unaware of hazards or the safety regulations are not being strictly followed. This paper analyses the safety management systems at construction sites through means of questionnaire surveys with employees, specifically referring to safety of material handling equipment. Based on results of the questionnaire surveys, two construction sites were selected for a safety education program targeting worker safety related to material handling equipment. Knowledge levels of the workers were gathered before and after the program and results obtained were subjected to a t-test analysis to mark significance level of the conducted safety education program. PMID:26446572

  15. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  16. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  17. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  18. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  19. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS FOR THE DESIGN AND CONSTRUCTION OF NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL...

  20. Roads and Airfields I (Programed Instruction). Engineer Subcourse 64-9.

    ERIC Educational Resources Information Center

    Army Engineer School, Fort Belvoir, VA.

    The document is a programed text for a correspondence course in the planning, construction, and maintenance of military roads and airfields. There are seven lessons: construction requirements and design criteria; road reconnaissance and site selection; airfield reconnaissance and site selection; layout procedures, construction staking, and field…

  1. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS FOR THE DESIGN AND CONSTRUCTION OF NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL...

  2. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    ERIC Educational Resources Information Center

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  3. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  4. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  5. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  6. Environmental projects, volume 10. Environmental assessment: New 34-meter antenna at Apollo site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.

  7. Life-threatening methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite in the construction sites.

    PubMed

    Sohn, C H; Seo, D W; Ryoo, S M; Lee, J H; Kim, W Y; Lim, K S; Oh, B J

    2014-01-01

    Construction workers are exposed to a wide variety of health hazards such as poisoning at the construction sites. Various forms of poisoning incidents in construction workers have been reported. However, studies on methemoglobinemia caused by unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites have not been reported yet. The aim of this study was to evaluate life-threatening methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites and describe similar incidents involving ingestion of antifreeze admixtures in Korea. Retrospective observational case series study on patients with methemoglobinemia after unintentional ingestion of antifreeze admixtures containing sodium nitrite admitted to the emergency department (ED) from January 1, 2010 to December 31, 2012 and cases reported to the Korea Occupational Safety and Health Agency (KOSHA) was performed. Results. Six victims were admitted to our ED. They had methemoglobin levels ranging from 32.4% to 71.5% and all of them recovered after receiving one (2 mg/kg) or two doses infusion of methylene blue. From the data of the KOSHA, six incidents that caused 27 victims were identified. Of 27 victims, five were included in the ED cases. For all incidents, antifreeze admixtures were not contained in their original containers and all new containers did not have a new label. All workers mistook antifreeze admixtures for water. Among the 28 victims included in this study, four died. Unintentional ingestion of antifreeze admixtures containing sodium nitrite at the construction sites can cause life-threatening methemoglobinemia. There is a need to store and label potentially hazardous materials properly to avoid unintentional ingestion at the construction sites.

  8. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-11-01

    Construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site (SRS) began during FY-1984. The Savannah River Ecology Laboratory (SREL) has completed 15 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Through the long-term census taking of biota at the DWPF site and Rainbow Bay, SREL has been evaluating the impact of construction on the biota and the effectiveness of mitigation efforts. similarly, the effects of erosion from the DWPF site on the water quality ofmore » S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).« less

  9. 40 CFR 60.1115 - What is a siting analysis?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... § 60.1115 What is a siting analysis? The siting analysis addresses how your municipal waste combustion... environmental and social costs resulting from its location and construction. The analysis must also consider...

  10. Influence of low impact development construction on pollutant process of road-deposited sediments and associated heavy metals.

    PubMed

    Ma, Yukun; Gong, Manli; Zhao, Hongtao; Li, Xuyong

    2018-02-01

    Intense Low-Impact Development (LID) construction in China could lead to increasingly severe stormwater and receiving water pollution due to the lack of appropriate regulation for mitigating pollution from LID construction. Samples of road-deposited sediments (RDS) were collected from 50 study sites at seven LID construction stages and four road hierarchies to analyze the pollution process and determine the size of the region influenced by LID construction. Six heavy metals were analyzed, and the RDS index model was adopted to estimate the potential heavy metal load washed off by stormwater runoff. Analysis of variance revealed that the excavation and gravel filling of rain gardens and excavation of porous pavements were critical LID construction stages that contributed the largest masses of RDS per unit area to road surfaces. Although the concentration of heavy metals at LID construction sites was lower than at sites without LID construction, the load of heavy metals washed off from LID construction was much higher. In addition, the sizes of regions influenced by accumulated RDS from LID construction descended in the following order: arterial road (600-775m)>collector road (150-200m)>access road (100-150m)>laneway (20-30m). According to the characteristics of LID construction at the study sites, the potential total solid loads in stormwater throughout China were estimated to reach 36,694t by 2020 and 146,777t by 2030. According to the results of analysis, several recommendations are provided for designing LID construction regulations to mitigate stormwater pollution. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... their authorized channels at all of their base stations or fixed stations. [69 FR 75173, Dec. 15, 2004] ... will not be converted to individual, site-by-site authorizations for already constructed stations. (d...

  12. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  13. 78 FR 23837 - Cranes and Derricks in Construction: Underground Construction and Demolition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... report here the results for the entire heavy-and-civil engineering sector and the entire site... in this final rule because employers included in the heavy-and-civil engineering sector, or the site... final rule. This final rule affects two construction sectors: NAICS 237990 (Other Heavy and Civil...

  14. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FOR NEW FEDERAL LOW-RISE RESIDENTIAL BUILDINGS Mandatory Energy Efficiency Standards for Federal Low-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  15. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FOR NEW FEDERAL LOW-RISE RESIDENTIAL BUILDINGS Mandatory Energy Efficiency Standards for Federal Low-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  16. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  17. A Neophyte Constructs a Web Site: Lessons Learned.

    ERIC Educational Resources Information Center

    Bent, Devin

    1998-01-01

    A political science professor at James Madison University (VA) constructed a Web page to support an undergraduate course in government. This article defines Web-site goals and audience, reviews other sites, and discusses organization of Web links and technical choices for HTML editor, page layout and use of image, audio, and video files. Stresses…

  18. The morphological development of newly inundated intertidal areas: the mechanisms driving the early evolution of an estuarine environment designed and constructed by humans

    NASA Astrophysics Data System (ADS)

    Dale, Jonathan; Burgess, Heidi; Cundy, Andrew

    2017-04-01

    Intertidal saltmarsh and mudflat habitats are of global importance due to the ecosystem, economic and cultural services they provide. These services include wildlife habitat provision and species diversity, immobilisation of pollutants and protection from coastal flooding. Saltmarsh and mudflat environments are, however, being lost and degraded due to erosion caused by rising sea levels and increased storminess. These losses are exacerbated by anthropogenic influences including land reclamation, increased coastal development and the construction of coastal flood defences which prevent the landwards migration of saltmarsh and mudflat environments, resulting in coastal squeeze. To compensate for saltmarsh and mudflat losses areas of the coastal hinterland are being inundated by breaching defences and constructing new defences inland, thus extending or constructing new estuarine environments; a processes known as de-embankment or managed realignment. Morphological engineering and landscaping within managed realignment sites prior to site inundation varies depending on the aims of the scheme. However, there is a shortage of data on the morphological evolution within these sites post site inundation impeding the ability of coastal engineers to effectively design and construct future sites. To date there has been a focus on the colonisation of marine macro fauna and flora within newly inundated managed realignment sites, which can be relatively rapid and easily quantified. Little is known of the morphological evolution in response to altered sedimentary processes, its driving mechanisms and therefore the success and ecological sustainability of these sites. This study evaluates the post-inundation morphological development of the largest open coast managed realignment site in Europe, at Medmerry on the south coast of the United Kingdom. Inundated in September 2013, the Medmerry Managed Realignment Site consists of a mosaic of former agricultural land and areas of lower elevation excavated during site construction, drained by a series of natural and engineered channels. Results indicate different rates and patterns of sedimentation and resulting morphology across the site. Near the breach continuous sedimentation of > 15cm over a 1 year period was measured, compared to rhythmic periods of accretion and erosion inland. These variations have been related to site design, former land-use and different sediment sources. The evolution of developing creek networks, formed by pluvial action and sediment "piping", are controlled by unconformities found in the sub-surface sediment related to Holocene site evolution. Analysis of the sedimentary processes and subsequent morphological development of these areas provides a new insight into coastal and estuarine evolution in an anthropogenically designed and constructed estuarine environment.

  19. Solid frustrated-Lewis-pair catalysts constructed by regulations on surface defects of porous nanorods of CeO2

    PubMed Central

    Zhang, Sai; Huang, Zheng-Qing; Ma, Yuanyuan; Gao, Wei; Li, Jing; Cao, Fangxian; Li, Lin; Chang, Chun-Ran; Qu, Yongquan

    2017-01-01

    Identification on catalytic sites of heterogeneous catalysts at atomic level is important to understand catalytic mechanism. Surface engineering on defects of metal oxides can construct new active sites and regulate catalytic activity and selectivity. Here we outline the strategy by controlling surface defects of nanoceria to create the solid frustrated Lewis pair (FLP) metal oxide for efficient hydrogenation of alkenes and alkynes. Porous nanorods of ceria (PN-CeO2) with a high concentration of surface defects construct new Lewis acidic sites by two adjacent surface Ce3+. The neighbouring surface lattice oxygen as Lewis base and constructed Lewis acid create solid FLP site due to the rigid lattice of ceria, which can easily dissociate H–H bond with low activation energy of 0.17 eV. PMID:28516952

  20. Unit soil loss rate from various construction sites during a storm.

    PubMed

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  1. 3D-Web-GIS RFID location sensing system for construction objects.

    PubMed

    Ko, Chien-Ho

    2013-01-01

    Construction site managers could benefit from being able to visualize on-site construction objects. Radio frequency identification (RFID) technology has been shown to improve the efficiency of construction object management. The objective of this study is to develop a 3D-Web-GIS RFID location sensing system for construction objects. An RFID 3D location sensing algorithm combining Simulated Annealing (SA) and a gradient descent method is proposed to determine target object location. In the algorithm, SA is used to stabilize the search process and the gradient descent method is used to reduce errors. The locations of the analyzed objects are visualized using the 3D-Web-GIS system. A real construction site is used to validate the applicability of the proposed method, with results indicating that the proposed approach can provide faster, more accurate, and more stable 3D positioning results than other location sensing algorithms. The proposed system allows construction managers to better understand worksite status, thus enhancing managerial efficiency.

  2. A novel methodology to estimate the evolution of construction waste in construction sites.

    PubMed

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. 3D-Web-GIS RFID Location Sensing System for Construction Objects

    PubMed Central

    2013-01-01

    Construction site managers could benefit from being able to visualize on-site construction objects. Radio frequency identification (RFID) technology has been shown to improve the efficiency of construction object management. The objective of this study is to develop a 3D-Web-GIS RFID location sensing system for construction objects. An RFID 3D location sensing algorithm combining Simulated Annealing (SA) and a gradient descent method is proposed to determine target object location. In the algorithm, SA is used to stabilize the search process and the gradient descent method is used to reduce errors. The locations of the analyzed objects are visualized using the 3D-Web-GIS system. A real construction site is used to validate the applicability of the proposed method, with results indicating that the proposed approach can provide faster, more accurate, and more stable 3D positioning results than other location sensing algorithms. The proposed system allows construction managers to better understand worksite status, thus enhancing managerial efficiency. PMID:23864821

  4. 14 CFR 77.13 - Construction or alteration requiring notice.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... feet in height above the ground level at its site. (2) Any construction or alteration of greater height... 5,000 feet from the nearest point of the nearest landing and takeoff area of each heliport specified... construction or alteration is more than 200 feet above the surface level of its site; or (2) An FAA regional...

  5. Recycling of construction debris as aggregate in the Mid-Atlantic Region, USA

    USGS Publications Warehouse

    Robinson, G.R.; Menzie, W.D.; Hyun, H.

    2004-01-01

    Reclaimed asphalt pavement (RAP) and portland cement concrete (RPCC) are abundant and available substitutes for natural aggregate in many areas. This paper presents an overview of factors that affect recycled aggregate cost, availability, and engineering performance, and the results of a survey of business practices in the Mid-Atlantic region. For RAP, processing costs are less than those for virgin natural aggregate. Use of efficient asphalt pavement stripping technology, on-site reclamation, and linked two-way transport of asphalt debris and processed asphalt paving mix between asphalt mix plants and paving sites has led to extensive recycling of asphalt pavement in the Mid-Atlantic region of the US. Most of the sites that recycle asphalt pavement (RAP) are located in or near urban areas close to important transportation corridors. RPCC is a viable aggregate source in urban settings where unit costs for processed aggregate from RPCC and natural aggregate are comparable. Disposal fees charged at RPCC recycling sites help defray processing costs and the significantly lower tipping fees at recycling sites versus landfill disposal sites encourage recycling of construction debris as aggregate. Construction contractors and construction debris recycling centers, many of which have the ability to crush and process concrete debris at the job site, produce most RPCC. Production of RPCC aggregate from construction debris that is processed on site using portable equipment moved to the construction site eliminates transportation costs for aggregate and provides an economic incentive for RPCC use. Processing costs, quality and performance issues, and lack of large quantities where needed limit RPCC use. Most RPCC suppliers in the Mid-Atlantic area are located in counties with population densities greater than 400 people/km2 (1036 people/mile2) and that have high unit-value costs and limited local availability of natural aggregate. ?? 2004 Published by Elsevier B.V.

  6. Nucleic acid constructs containing orthogonal site selective recombinases (OSSRs)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilmore, Joshua M.; Anderson, J. Christopher; Dueber, John E.

    The present invention provides for a recombinant nucleic acid comprising a nucleotide sequence comprising a plurality of constructs, wherein each construct independently comprises a nucleotide sequence of interest flanked by a pair of recombinase recognition sequences. Each pair of recombinase recognition sequences is recognized by a distinct recombinase. Optionally, each construct can, independently, further comprise one or more genes encoding a recombinase capable of recognizing the pair of recombinase recognition sequences of the construct. The recombinase can be an orthogonal (non-cross reacting), site-selective recombinase (OSSR).

  7. Feasibility Study on UAV-assisted Construction Surplus Soil Tracking Control and Management Technique

    NASA Astrophysics Data System (ADS)

    Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen

    2018-01-01

    Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.

  8. Prevalence and correlates of nicotine dependence among construction site workers: A cross-sectional study in Delhi.

    PubMed

    Parashar, Mamta; Agarwalla, Rashmi; Mallik, Praveen; Dwivedi, Shridhar; Patvagekar, Bilkish; Pathak, Rambha

    2016-01-01

    Workers represent half the world's population and are major contributors to economic and social development. Tobacco consumption in construction site workers has been considered a big challenge. (1) To assess the prevalence of nicotine dependence among tobacco users. (2) To study the correlates of nicotine dependence among the construction site workers. A cross sectional study was conducted using a predesigned and pretested structured proforma. The study was conducted among all construction site workers aged 18yrs and above in campus of Hamdard Institute of Medical Sciences and Research and associated HAH centenary hospital, New Delhi. Karl Fagerstrom Nicotine Dependence Questionnaire was used to assess dependence on nicotine. The mean age of construction site workers was 32.04±11.6 years. Among the workers, majority (91%) were tobacco user. Among the users, 60% found it difficult to refrain from smoking/chewing in places where use of tobacco is not allowed (e.g. hospitals, government offices, cinemas, Libraries etc). 55% of the users smoked or chewed tobacco during the first hours after waking than during the rest of the day. On multivariate analysis, the factors which were found to be significantly associated with nicotine dependence were lower income group (OR 2.57, CI:1.66-3.99), smokeless tobacco use (OR 2.36, CI:1.30-4.27) and lower education (OR = 2.86 (95% CI 1.97-4.16) for illiterate). The prevalence of tobacco use (91%) among construction workers is very high compared to that in the general population. Recognition of construction sites as work places and proper implementation of law is needed.

  9. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    PubMed

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. Site Construction - MSC

    NASA Image and Video Library

    1963-01-01

    S63-01074 (1963) --- A black and white aerial view of Site 1, the Manned Spacecraft Center, in 1963 during early construction. The view faces the southwest. Highway 528 is at the top of the picture. Second Street runs basically north and south on the right side of the image, to the right or west and running parallel to that avenue is a drainage ditch. Winding through the site a Houston Lighting and Power Co. canal crosses over the drainage ditch near the top of the frame. Twin bridges over the canal are pictured at upper left which were constructed to allow traffic to enter and leave through MSC's secondary gateway. In frame center, construction appears very far along on the Central Data Office.

  11. 29 CFR 825.111 - Determining whether 50 employees are employed within 75 miles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., from which their work is assigned, or to which they report. For example, if a construction company... site as the company's on-site office, the construction site in Ohio would be the worksite for any employees hired locally who report to the mobile trailer/company office daily for work assignments, etc. If...

  12. 71. ARAII. Construction progress at SL1 site near end of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    71. ARA-II. Construction progress at SL-1 site near end of 1957. Buildings from right to left are guard house, support building, reactor building, water tank and pump house. Construction was 23 percent complete. December 20, 1957. Ineel photo no. 57-6224. Photographer: Jack L. Anderson. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  13. 20. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of an as-constructed site plan for additions to North Base: Job No. A(8-1), Military Construction, Materiel Command Flight Test Base, Muroc, California; Additional Construction, Location Plan, Sheet No. 2, October 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  14. 40 CFR 60.1150 - How do I submit my siting analysis?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... items as part of the notice of construction: (a) Your siting analysis. (b) Your notice of the public...

  15. Motion Predicts Clinical Callus Formation

    PubMed Central

    Elkins, Jacob; Marsh, J. Lawrence; Lujan, Trevor; Peindl, Richard; Kellam, James; Anderson, Donald D.; Lack, William

    2016-01-01

    Background: Mechanotransduction is theorized to influence fracture-healing, but optimal fracture-site motion is poorly defined. We hypothesized that three-dimensional (3-D) fracture-site motion as estimated by finite element (FE) analysis would influence callus formation for a clinical series of supracondylar femoral fractures treated with locking-plate fixation. Methods: Construct-specific FE modeling simulated 3-D fracture-site motion for sixty-six supracondylar femoral fractures (OTA/AO classification of 33A or 33C) treated at a single institution. Construct stiffness and directional motion through the fracture were investigated to assess the validity of construct stiffness as a surrogate measure of 3-D motion at the fracture site. Callus formation was assessed radiographically for all patients at six, twelve, and twenty-four weeks postoperatively. Univariate and multivariate linear regression analyses examined the effects of longitudinal motion, shear (transverse motion), open fracture, smoking, and diabetes on callus formation. Construct types were compared to determine whether their 3-D motion profile was associated with callus formation. Results: Shear disproportionately increased relative to longitudinal motion with increasing bridge span, which was not predicted by our assessment of construct stiffness alone. Callus formation was not associated with open fracture, smoking, or diabetes at six, twelve, or twenty-four weeks. However, callus formation was associated with 3-D fracture-site motion at twelve and twenty-four weeks. Longitudinal motion promoted callus formation at twelve and twenty-four weeks (p = 0.017 for both). Shear inhibited callus formation at twelve and twenty-four weeks (p = 0.017 and p = 0.022, respectively). Titanium constructs with a short bridge span demonstrated greater longitudinal motion with less shear than did the other constructs, and this was associated with greater callus formation (p < 0.001). Conclusions: In this study of supracondylar femoral fractures treated with locking-plate fixation, longitudinal motion promoted callus formation, while shear inhibited callus formation. Construct stiffness was found to be a poor surrogate of fracture-site motion. Future implant design and operative fixation strategies should seek to optimize 3-D fracture-site motion rather than rely on surrogate measures such as axial stiffness. PMID:26888675

  16. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    NASA Astrophysics Data System (ADS)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  17. Implementation guidance for accelerated bridge construction in South Dakota

    DOT National Transportation Integrated Search

    2017-09-01

    A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...

  18. Construction, Part of Indoor Air Quality Design Tools for Schools

    EPA Pesticide Factsheets

    Poor job-site construction practices can frustrate even the best design by allowing moisture and other contaminants to become potential long term problems. Preventive job-site practices will reduce the potential for residual problems with IAQ

  19. 77 FR 1780 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... development--design and construction. Site utilities--design and construction. Stormwater facilities--design and construction. Airside/apron--design and construction. Landside/roadway--design and construction. General aviation terminal/apron--design and construction. Airport beacon relocation--design and...

  20. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  1. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  2. Project Sedan, On-Site Radiological Safety Report

    DTIC Science & Technology

    1962-10-23

    construction site between U2a & 95 U3a Complete construction area average 100 7/12/62 1530 Outside Bunker 2-300 50 7/12/62 1532 Inside Bunker 2-330 4 39...Analysis of Weather and Surface Radiation Data SC 202F Long Range Blast Propagation REECO 203F On-Site Rad-Safe AEC/ USBM 204F Structural Survey of

  3. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  4. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  5. An assessment of the performance of municipal constructed wetlands in Ireland.

    PubMed

    Hickey, Anthony; Arnscheidt, Joerg; Joyce, Eadaoin; O'Toole, James; Galvin, Gerry; O' Callaghan, Mark; Conroy, Ken; Killian, Darran; Shryane, Tommy; Hughes, Francis; Walsh, Katherine; Kavanagh, Emily

    2018-03-15

    While performance assessments of constructed wetlands sites around the world have appraised their capacity for effective removal of organics, a large variance remains in these sites' reported ability to retain nutrients, which appears to depend on differences in design, operation and climate factors. Nutrient retention is a very important objective for constructed wetlands, to avoid eutrophication of aquatic environments receiving their effluents. This study assessed the performance of constructed wetlands in terms of nutrient retention and associated parameters under the humid conditions of Ireland's temperate maritime climate. A review of the performance of 52 constructed wetland sites from 17 local authorities aimed to identify the best performing types of constructed wetlands and the treatment factors determining successful compliance with environmental standards. Data analysis compared effluent results from constructed wetlands with secondary free surface flow or tertiary horizontal subsurface flow, hybrid systems and integrated constructed wetlands with those from small-scale mechanical wastewater treatment plants of the same size class. Nutrient concentrations in effluents of constructed wetlands were negatively correlated (p < .01) with specific area, i.e. the ratio of surface area and population equivalents. The latest generation of integrated constructed wetlands, which had applied design guidelines issued by the Department of the Environment, performed best. Storm management design features improved treatment performance of constructed wetlands significantly (p < .05) for total suspended solids concentrations and exceedance frequency of limit values for total nitrogen. Mechanical wastewater treatment plants, secondary free surface water and tertiary horizontal subsurface flow wetlands showed a very large variance in effluent concentrations for organic and nutrient parameters. E. coli numbers in effluents were lowest for integrated constructed wetlands with an arithmetic mean of 89 MPN/100 ml. Despite Ireland's humid climate, some constructed wetland sites achieved long or frequent periods of zero effluent discharge and thus did not transfer any waterborne pollution to their receptors during these periods. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. 48 CFR 915.404-4-71-6 - Fee base.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...

  7. An industrialized construction approach to concrete superstructures for bridges.

    DOT National Transportation Integrated Search

    1974-01-01

    The objective of this study was to develop drawings for a specific site or sites that incorporated the best concepts of industrialized bridge superstructure construction, that is, great emphasis was placed upon the use of modular design and assembly ...

  8. Improved decision making in construction using virtual site visits.

    DOT National Transportation Integrated Search

    2003-01-01

    This study explored the dynamics of information exchange involving field issues relating to construction and the assistance that a virtual site visit can provide to the field decision-making process. Such a process can be used for inspection and surv...

  9. 10 CFR 60.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General..., special nuclear, and byproduct material at a geologic repository operations area sited, constructed, or... at a geologic repository operations area sited, constructed, or operated at Yucca Mountain, Nevada...

  10. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    NASA Technical Reports Server (NTRS)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  11. Logistic Regression in the Identification of Hazards in Construction

    NASA Astrophysics Data System (ADS)

    Drozd, Wojciech

    2017-10-01

    The construction site and its elements create circumstances that are conducive to the formation of risks to safety during the execution of works. Analysis indicates the critical importance of these factors in the set of characteristics that describe the causes of accidents in the construction industry. This article attempts to analyse the characteristics related to the construction site, in order to indicate their importance in defining the circumstances of accidents at work. The study includes sites inspected in 2014 - 2016 by the employees of the District Labour Inspectorate in Krakow (Poland). The analysed set of detailed (disaggregated) data includes both quantitative and qualitative characteristics. The substantive task focused on classification modelling in the identification of hazards in construction and identifying those of the analysed characteristics that are important in an accident. In terms of methodology, resource data analysis using statistical classifiers, in the form of logistic regression, was the method used.

  12. The Gene Construction Kit: a new computer program for manipulating and presenting DNA constructs.

    PubMed

    Gross, R H

    1990-06-01

    The Gene Construction Kit is a new tool for manipulating and displaying DNA sequence information. Constructs can be displayed either graphically or as formatted sequence. Segments of DNA can be cut out with restriction enzymes and pasted into other sites. The program keeps track of staggered ends and notifies the user of incompatibilities and offers a choice of ligation options. Each segment of a construct can have its own defined thickness, pattern, direction and color. The sequence listing can be displayed in any font and style in user defined grouping. Nucleotide positions can be displayed as can restriction sites and protein sequences. The DNA can be displayed as either single- or double-stranded. Restriction sites can be readily marked. Alternative views of the DNA can be maintained and the history of the construct automatically stored. Gel electrophoresis patterns can be generated and can be used in cloning project design. Extensive comments can be stored with the construct and can be searched rapidly for key words. High quality illustrations showing multiple editable constructs with added graphics and text information can be generated for slides, posters or publication.

  13. Assessment of the long-term impacts of PM10 and PM2.5 particles from construction works on surrounding areas.

    PubMed

    Azarmi, Farhad; Kumar, Prashant; Marsh, Daniel; Fuller, Gary

    2016-02-01

    Construction activities are common across cities; however, the studies assessing their contribution to airborne PM10 (≤10 μm) and PM2.5 (≤2.5 μm) particles on the surrounding air quality are limited. Herein, we assessed the impact of PM10 and PM2.5 arising from construction works in and around London. Measurements were carried out at 17 different monitoring stations around three construction sites between January 2002 and December 2013. Tapered element oscillating microbalance (TEOM 1400) and OSIRIS (2315) particle monitors were used to measure the PM10 and PM2.5 fractions in the 0.1-10 μm size range along with the ambient meteorological data. The data was analysed using bivariate concentration polar plots and k-means clustering techniques. Daily mean concentrations of PM10 were found to exceed the European Union target limit value of 50 μg m(-3) at 11 monitoring stations but remained within the allowable 35 exceedences per year, except at two monitoring stations. In general, construction works were found to influence the downwind concentrations of PM10 relatively more than PM2.5. Splitting of the data between working (0800-1800 h; local time) and non-working (1800-0800 h) periods showed about 2.2-fold higher concentrations of PM10 during working hours when compared with non-working hours. However, these observations did not allow to conclude that this increase was from the construction site emissions. Together, the polar concentration plots and the k-means cluster analysis applied to a pair of monitoring stations across the construction sites (i.e. one in upwind and the other in downwind) confirmed the contribution of construction sources on the measured concentrations. Furthermore, pairing the monitoring stations downwind of the construction sites showed a logarithmic decrease (with R(2) about 0.9) in the PM10 and PM2.5 concentration with distance. Our findings clearly indicate an impact of construction activities on the nearby downwind areas and a need for developing mitigation measures to limit their escape from the construction sites.

  14. Using stable isotopes of water and strontium to investigate the hydrology of a natural and a constructed wetland

    USGS Publications Warehouse

    Hunt, R.J.; Bullen, T.D.; Krabbenhoft, D.P.; Kendall, C.

    1998-01-01

    Wetlands cannot exist without water, but wetland hydrology is difficult to characterize. As a result, compensatory wetland mitigation often only assumes the proper hydrology has been created. In this study, water sources and mass transfer processes in a natural and constructed wetland complex were investigated using isotopes of water and strontium. Water isotope profiles in the saturated zone revealed that the natural wetland and one site in the constructed wetland were primarily fed by ground water; profiles in another constructed wetland site showed recent rain was the predominant source of water in the root zone. Water isotopes in the capillary fringe indicated that the residence time for rain is less in the natural wetland than in the constructed wetland, thus transpiration (an important water sink) was greater in the natural wetland. Strontium isotopes showed a systematic difference between the natural and constructed wetlands that we attribute to the presence or absence of peat. In the peat-rich natural wetland, ??87Sr in the pore water increased along the flowline due to preferential weathering of minerals containing radiogenic Sr in response to elevated Fe concentrations in the water. In the constructed wetland, where peat thickness was thin and Fe concentrations in water were negligible, ??87Sr did not increase along the flowline. The source of the peat (on-site or off-site derived) applied in the constructed wetland controlled the ??87Sr at the top of the profile, but the effects were restricted by strong cation exchange in the underlying fluvial sediments. Based on the results of this study, neither constructed wetland site duplicated the water source and weathering environment of the adjoining natural wetland. Moreover, stable isotopes were shown to be effective tools for investigating wetlands and gaining insight not easily obtained using non-isotopic techniques. These tools have potential widespread application to wetlands that have distinct isotopic endmember sources.

  15. Geotechnical investigation report for proposed array of six 40-meter diameter antennas, Pioneer site, DSS 11, Goldstone, California tracking complex

    NASA Technical Reports Server (NTRS)

    Sweitzer, J. S.

    1979-01-01

    The geotechnical investigation was conducted in three disciplines: (1) geological field reconnaissance of the general area of proposed construction; (2) geophysical seismic refraction survey of the localized area surrounding the six proposed antenna sites, including shear wave velocity determination; and (3) detailed foundation engineering investigation of each of the six sites. The investigations indicate that the six sites selected are relatively free from geologic hazards which would inhibit the proposed construction or future antenna operations.

  16. Environmental Assessment: Addressing Construction Projects at Niagara Falls Air Reserve Station, New York

    DTIC Science & Technology

    2011-07-01

    Aeronautical Research Center missile site (Site 5), JP-4 tank truck spill (Site 7) at the eastern end of Taxiway A, Building 202 Drum Storage Yard (Site...BNOISE2. BNOISE2 was developed by the . U.S. Army Construction Engineering Research Laboratory for the Operational Noise to assess large arms weapons...was estimated using the OneShot component of BNOISE2. Per AR 200-1, if there are multiple weapon types fired from one location, the single-event

  17. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  18. Another First at NSLS-II Construction Site

    ScienceCinema

    None

    2017-12-09

    Workers at the NSLS-II ring building construction site recently completed the first complicated concrete pour for the approximately 19-ft.-tall walls of the Utility Tunnel. The continuous pour was the first of its kind, as previous pours have been for foo

  19. 48 CFR 22.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations— (1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated...

  20. SRS SWPF Construction Completion

    ScienceCinema

    Craig, Jack; Sheppard, Frank; Marks, Pam

    2018-01-16

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  1. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    PubMed Central

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  2. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    USGS Publications Warehouse

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative to transportation network and population distribution data. The models can be used on a regional scale to quickly map the relative site suitability for a RAP or RPCC aggregate recycling operation in a particular area based on transportation network and population parameters. The results can be used to identify general areas to be further evaluated on a site-specific basis using more detailed marketplace information. As transportation or population features change due to planning or actual development, the models can be easily revised to reflect these changes. ?? 2004 Elsevier B.V. All rights reserved.

  3. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    EPA Science Inventory

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  4. Tailgate test kit for determining appropriate sediment reducing chemicals and dose rates : final report.

    DOT National Transportation Integrated Search

    2017-07-01

    This study develops a Tailgate Test Kit to be used in the field to test flocculants for reducing turbidity in construction stormwater discharge. Turbidity of stormwater runoff at construction sites varies depending on which site soils are exposed to ...

  5. 7 CFR 1740.9 - Grant application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorized the initiation of digital broadcasting at the project sites. In the event that an FCC construction... advance of funds for that site conditional upon the submission of a construction permit. (j) Compliance... Digital Transition,” and must include the Environmental Questionnaire/Certification, available from RUS...

  6. Mechanisation and automation technologies development in work at construction sites

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  7. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    USGS Publications Warehouse

    Sherfy, M.H.; Stucker, J.H.; Buhl, D.A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (na =a 798) and random points (na =a 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns. ?? 2011 The Wildlife Society.

  8. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    USGS Publications Warehouse

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  9. Notions of reliability: considering the importance of difference in guiding patients to health care Web sites.

    PubMed

    Adams, S A; De Bont, A A

    2003-01-01

    This article analyzes the efforts of three organizations to provide a standard that guides Internet users to reliable health care sites. Comparison of health Internet sites, interviews and document studies. In comparing these approaches, three different constructions of reliability are identified. The resulting possibilities and restrictions of these constructions for users that are searching for health information on the Internet are revealed.

  10. Geophysical Survey of Poverty Point UNESCO World Heritage Site Mound A

    NASA Astrophysics Data System (ADS)

    Frazer, W.; Bourke, J. R.; De Smet, T.; Nikulin, A.

    2017-12-01

    Poverty Point is an UNESCO World Heritage Site located in northern Louisiana, known for its six earthwork ridges and mounds of archeological significance. The largest of these earthworks and most significant feature on the site, Mound A is over 70 feet (21 m) high and 640 feet (200 m) long. To construct this mound, it would have taken about 16 million basket loads of dirt which weight approximately 50 lbs. each (23 kg). The current archeological theory describing the construction of Mound A states it was built in three months at most, with some suggesting construction times as short as a month, but beyond this not much else is known about Mound A or Poverty Point. The pace of Mound A's construction has been used as evidence to support the idea that there was a central leader directing its construction and that the population inhabiting the site was more socio-politically complex than previous hunter-gatherer populations in North America. Evidence of heterogeneity and stratigraphic layering, however, is an indication of a slow mound construction over centuries by a relatively egalitarian hunter-gather society. A greater understanding of the construction style and timeline for the construction of Mound A will lead to a greater understanding to the site, its people their lifestyles. Mound Builders have been known to cap mounds they have built if they were to be built in stages so if Mound A was built in stages it is likely capped with some more dense material than the dirt surrounding it. To better understand the construction history of Mound A we collected photogrammetry, seismic reflection, ground-penetrating radar, frequency-domain electromagnetic-induction, resistivity, and magnetometry data over the mound. The seismic data had a normal moveout correction, it was stacked and migrated. Additionally, with the application of quadcopter-based photogrammetry a three-dimensional digital model of Mound A was developed to display and assist in further understanding and dissemination of these data. With greater knowledge of the composition and construction of Mound A at Poverty Point will give greater insight to the people of who built it and their way of life.

  11. Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

    PubMed Central

    Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns. PMID:25114958

  12. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    PubMed

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  13. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    EPA Science Inventory

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  14. Schools That Sustain: Lessening the Environmental Impact of New Construction.

    ERIC Educational Resources Information Center

    Peele, Katherine N.; Malone, Sara

    2002-01-01

    Discusses sustainable school design and its benefits to the environment, offering examples of illustrative schools. Provides suggestions on site selection (such as using smaller sites and recycling existing buildings), sharing facilities with the community, and construction elements that improve environmental impact (such as flexibility,…

  15. Hazardous Waste Cleanup: AGFA Corporation - Peerless Photo Products in Shoreham, New York

    EPA Pesticide Factsheets

    The site is located on approximately 16.2 acres in a predominantly residential area. The site was originally developed in 1903 when Nikola Tesla constructed a building that served as a residence and a laboratory. Mr. Tesla also constructed a radio tower on

  16. NOAA Photo Library - Credits

    Science.gov Websites

    NOAA Photo Library Banner Takes you to the Top Page Takes you to the About this Site page. Takes . Skip Theberge (NOAA Central Library) -- Collection development, site content, image digitization, and database construction. Kristin Ward (NOAA Central Library) -- HTML page construction Without the generosity

  17. Prospective safety performance evaluation on construction sites.

    PubMed

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    NASA Astrophysics Data System (ADS)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera approach has the potential to reach the same accuracy level.

  19. Practical data collection : establishing methods and procedures for measuring water clarity and turbidity of storm water run-off from active major highway construction sites.

    DOT National Transportation Integrated Search

    2014-09-12

    In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was : done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment : concentration in streams may be conduc...

  20. 24 CFR 242.45 - Early commencement of work.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Early commencement of work. 242.45... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.45 Early commencement of work. (a) Site preparation... the commencement of certain necessary early site work and limited construction activity in connection...

  1. 23. Photographic copy of an asconstructed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of an as-constructed site plan for North Base: Air Force Flight Test Center, Edwards Air Force Base, Edwards, California: North Base Site Plan, February 1970. This drawing shows the North Base building distribution substantially as it appears in 1995. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  2. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  3. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  4. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    PubMed

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  5. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    PubMed

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Improving construction site safety through leader-based verbal safety communication.

    PubMed

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures. Coaching construction site foremen to include safety in their daily verbal exchanges with workers has a significantly positive and lasting effect on the level of safety, which is a proximal estimate for work-related accidents. It is recommended that future studies include coaching and feedback at all organizational levels and for all involved parties in the construction process. Building client regulations could assign the task of coaching to the client appointed safety coordinators or a manager/supervisor, and studies should measure longitudinal effects of coaching by following foremen and their work gangs from site to site. Copyright © 2010 National Safety Council and Elsevier Ltd. Published by Elsevier Ltd. All rights reserved.

  7. KSC-2012-6403

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, groundbreaking will begin for the construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  8. 19. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of an as-constructed site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Grading & Paving Plan, Sheet No. 1 of 21, March 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  9. An unusual fatal construction site injury in India: a case report.

    PubMed

    Rautji, Ravi; Behera, C; Dogra, T D

    2009-07-01

    A 35-year-old male, employed at a construction site, accidentally injured himself when an iron rod, which he was handing up from the ground floor to a fellow worker standing on the first floor, fell backwards. It pierced his suprascapular fossa on the right side, damaging great vessels and the tricuspid valve, and entered the pericardial cavity after puncturing the posterior wall of the right ventricle. The iron rod was taken out by fellow workers at the site and the injured man was immediately taken to a nearby clinic where he was resuscitated and the wound was stitched. He was later transferred to a tertiary care hospital where he died about an hour after admission. Though many bizarre injuries have been reported at construction sites, a fatal injury of this nature deserves a mention in the forensic literature.

  10. Possible Impacts of Nanoparticles on Children of Thai Construction Industry

    NASA Astrophysics Data System (ADS)

    Musikaphan, W.; Kitisriworaphan, T.

    A possible impact of nanoparticles on human health becomes a concerned issue especially among children who probably lack of self protection. For Thai construction workers, their pre-school children are more likely to expose such the fine particles due to they have to spend their lives in construction site. This study points out the health problems related to nanoparticles exposition among pre-school children of Thai construction workers. The finding indicated that children who reside and play in construction site are more likely to expose to chemical particles and left behind toxic materials during pre and post construction process than others. Thus, urgent policy is strongly recommended for this vulnerable group since all children are very important as the main source of the national productivity in the future, especially in the aging society.

  11. Construction of armored RNA containing long-size chimeric RNA by increasing the number and affinity of the pac site in exogenous rna and sequence coding coat protein of the MS2 bacteriophage.

    PubMed

    Wei, Baojun; Wei, Yuxiang; Zhang, Kuo; Yang, Changmei; Wang, Jing; Xu, Ruihuan; Zhan, Sien; Lin, Guigao; Wang, Wei; Liu, Min; Wang, Lunan; Zhang, Rui; Li, Jinming

    2008-01-01

    To construct a one-plasmid expression system of the armored RNA containing long chimeric RNA by increasing the number and affinity of the pac site. The plasmid pET-MS2-pac was constructed with one C-variant pac site, and then the plasmid pM-CR-2C containing 1,891-bp chimeric sequences and two C-variant pac sites was produced. Meanwhile, three plasmids (pM-CR-C, pM-CR-2W and pM-CR-W) were obtained as parallel controls with a different number and affinity of the pac site. Finally, the armored RNA was expressed and purified. The armored RNA with 1,891 bases target RNA was expressed successfully by the one-plasmid expression system with two C-variant pac sites, while for one pac site, no matter whether the affinity was changed or not, only the 1,200 bases target RNA was packaged. It was also found that the C-variant pac site could increase the expression efficiency of the armored RNA. The armored RNA with 1,891-bp exogenous RNA in our study showed the characterization of ribonuclease resistance and stability at different time points and temperature conditions. The armored RNA with 1,891 bases exogenous RNA was constructed and the expression system can be used as a platform for preparation of the armored RNA containing long RNA sequences. Copyright 2008 S. Karger AG, Basel.

  12. 14 CFR 77.13 - Construction or alteration requiring notice.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... height above the ground level at its site. (2) Any construction or alteration of greater height than an... feet from the nearest point of the nearest landing and takeoff area of each heliport specified in... feet above the surface level of its site; or (2) An FAA regional office advises him that submission of...

  13. 48 CFR 36.210 - Inspection of site and examination of data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction. The data should be assembled in one place and made available for examination. The solicitation should notify offerors of the time and place for the site inspection and data examination. If it is not... utilities to be furnished during construction. A record should be kept of the identity and affiliation of...

  14. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  15. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  16. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  17. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  18. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  19. Weaving a Syllaweb: Consideration before Constructing an On-line Syllabus.

    ERIC Educational Resources Information Center

    Johnston, Joyce P.

    This paper explores the practical and philosophical issues involved in Web site construction so that the finished site truly reflects its creator. The author uses the term "syllaweb" for a hyperlinked syllabus and declares that it was an outgrowth of Vannevar Bush's original description of computerized graphical communication as a web,…

  20. Experimental Setup for Evaluation of the Protective Technical Measures Against the Slopes Degradation Along Linear Construction Sites

    NASA Astrophysics Data System (ADS)

    Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan

    2017-04-01

    Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.

  1. 47 CFR 101.1325 - Construction requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...

  2. 47 CFR 101.1325 - Construction requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...

  3. Construction dust amelioration techniques.

    DOT National Transportation Integrated Search

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  4. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    NASA Astrophysics Data System (ADS)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory results are presented.

  5. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies.

    PubMed

    Cheung, Weng-Fong; Lin, Tzu-Hsuan; Lin, Yu-Cheng

    2018-02-02

    In recent years, many studies have focused on the application of advanced technology as a way to improve management of construction safety management. A Wireless Sensor Network (WSN), one of the key technologies in Internet of Things (IoT) development, enables objects and devices to sense and communicate environmental conditions; Building Information Modeling (BIM), a revolutionary technology in construction, integrates database and geometry into a digital model which provides a visualized way in all construction lifecycle management. This paper integrates BIM and WSN into a unique system which enables the construction site to visually monitor the safety status via a spatial, colored interface and remove any hazardous gas automatically. Many wireless sensor nodes were placed on an underground construction site and to collect hazardous gas level and environmental condition (temperature and humidity) data, and in any region where an abnormal status is detected, the BIM model will alert the region and an alarm and ventilator on site will start automatically for warning and removing the hazard. The proposed system can greatly enhance the efficiency in construction safety management and provide an important reference information in rescue tasks. Finally, a case study demonstrates the applicability of the proposed system and the practical benefits, limitations, conclusions, and suggestions are summarized for further applications.

  6. Improving concrete overlay construction.

    DOT National Transportation Integrated Search

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  7. Construction dust amelioration techniques : [executive summary].

    DOT National Transportation Integrated Search

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  8. Directions for lunar construction - A derivation of requirements from a construction scenario analysis

    NASA Technical Reports Server (NTRS)

    Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.

    1992-01-01

    This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

  9. 27. "SITE PLAN." Specifications No. OC15775, Drawing No. AF600915, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. "SITE PLAN." Specifications No. OC1-57-75, Drawing No. AF-60-09-15, sheet 1 of 96, D.O. Series No. AF 1394/20, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/17/59. Site plan of 20,000-foot track, including construction phasing notes. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  10. Facile Site-Directed Mutagenesis of Large Constructs Using Gibson Isothermal DNA Assembly.

    PubMed

    Yonemoto, Isaac T; Weyman, Philip D

    2017-01-01

    Site-directed mutagenesis is a commonly used molecular biology technique to manipulate biological sequences, and is especially useful for studying sequence determinants of enzyme function or designing proteins with improved activity. We describe a strategy using Gibson Isothermal DNA Assembly to perform site-directed mutagenesis on large (>~20 kbp) constructs that are outside the effective range of standard techniques such as QuikChange II (Agilent Technologies), but more reliable than traditional cloning using restriction enzymes and ligation.

  11. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  12. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  13. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  14. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  15. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  16. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  17. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  18. Childhood Traumatic Grief: A Multi-Site Empirical Examination of the Construct and Its Correlates

    ERIC Educational Resources Information Center

    Brown, Elissa J.; Amaya-Jackson, Lisa; Cohen, Judith; Handel, Stephanie; De Bocanegra, Heike Thiel; Zatta, Eileen; Goodman, Robin F.; Mannarino, Anthony

    2008-01-01

    This study evaluated the construct of childhood traumatic grief (CTG) and its correlates through a multi-site assessment of 132 bereaved children and adolescents. Youth completed a new measure of the characteristics, attributions, and reactions to exposure to death (CARED), as well as measures of CTG, posttraumatic stress disorder (PTSD),…

  19. Lexicogrammar in the International Construction Industry: A Corpus-Based Case Study of Japanese-Hong-Kongese On-Site Interactions in English

    ERIC Educational Resources Information Center

    Handford, Michael; Matous, Petr

    2011-01-01

    The purpose of this research is to identify and interpret statistically significant lexicogrammatical items that are used in on-site spoken communication in the international construction industry, initially through comparisons with reference corpora of everyday spoken and business language. Several data sources, including audio and video…

  20. 20 CFR 725.202 - Miner defined; condition of entitlement, miner.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C..., preparation, or transportation of coal, and any person who works or has worked in coal mine construction or... transportation of coal while working at the mine site, or in maintenance or construction of the mine site; or (2...

  1. 20 CFR 725.202 - Miner defined; condition of entitlement, miner.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C..., preparation, or transportation of coal, and any person who works or has worked in coal mine construction or... transportation of coal while working at the mine site, or in maintenance or construction of the mine site; or (2...

  2. 20 CFR 725.202 - Miner defined; condition of entitlement, miner.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C OF..., preparation, or transportation of coal, and any person who works or has worked in coal mine construction or... transportation of coal while working at the mine site, or in maintenance or construction of the mine site; or (2...

  3. 20 CFR 725.202 - Miner defined; condition of entitlement, miner.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C..., preparation, or transportation of coal, and any person who works or has worked in coal mine construction or... transportation of coal while working at the mine site, or in maintenance or construction of the mine site; or (2...

  4. 77 FR 38084 - Notice of Lodging of a Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ...'s home construction sites. The CD resolves the claims of the United States and State Plaintiffs for past violations at 370 construction sites by requiring the payment of a civil penalty of $741,000 and... Eastern District of Pennsylvania. In this action the United States brought claims against Toll Brothers...

  5. 20 CFR 725.202 - Miner defined; condition of entitlement, miner.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C..., preparation, or transportation of coal, and any person who works or has worked in coal mine construction or... transportation of coal while working at the mine site, or in maintenance or construction of the mine site; or (2...

  6. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  7. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. 48 CFR 52.225-9 - Buy American Act-Construction Materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products. Construction material... delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means— (1) For components purchased by the Contractor, the...

  9. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an... construction or installation of the collection and control system. Complete on-site construction means that all...

  10. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an... construction or installation of the collection and control system. Complete on-site construction means that all...

  11. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  12. Mini-columns for Conducting Breakthrough Experiments. Design and Construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dittrich, Timothy M.; Reimus, Paul William; Ware, Stuart Douglas

    Experiments with moderately and strongly sorbing radionuclides (i.e., U, Cs, Am) have shown that sorption between experimental solutions and traditional column materials must be accounted for to accurately determine stationary phase or porous media sorption properties (i.e., sorption site density, sorption site reaction rate coefficients, and partition coefficients or K d values). This report details the materials and construction of mini-columns for use in breakthrough columns to allow for accurate measurement and modeling of sorption parameters. Material selection, construction techniques, wet packing of columns, tubing connections, and lessons learned are addressed.

  13. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  14. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    PubMed Central

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176

  15. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    PubMed

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  16. Consent Agreement and Final Order Issued to Clark Construction Group, LLC

    EPA Pesticide Factsheets

    EPA Mid-Atlantic Region and Clark Construction Group, LLC has reached an agreement to settle Clean Water Act violations at The Wharf at Southwest Waterfront construction site in the amount of $19,000.

  17. Molecular Simulation of Receptor Occupancy and Tumor Penetration of an Antibody and Smaller Scaffolds: Application to Molecular Imaging.

    PubMed

    Orcutt, Kelly D; Adams, Gregory P; Wu, Anna M; Silva, Matthew D; Harwell, Catey; Hoppin, Jack; Matsumura, Manabu; Kotsuma, Masakatsu; Greenberg, Jonathan; Scott, Andrew M; Beckman, Robert A

    2017-10-01

    Competitive radiolabeled antibody imaging can determine the unlabeled intact antibody dose that fully blocks target binding but may be confounded by heterogeneous tumor penetration. We evaluated the hypothesis that smaller radiolabeled constructs can be used to more accurately evaluate tumor expressed receptors. The Krogh cylinder distributed model, including bivalent binding and variable intervessel distances, simulated distribution of smaller constructs in the presence of increasing doses of labeled antibody forms. Smaller constructs <25 kDa accessed binding sites more uniformly at large distances from blood vessels compared with larger constructs and intact antibody. These observations were consistent for different affinity and internalization characteristics of constructs. As predicted, a higher dose of unlabeled intact antibody was required to block binding to these distant receptor sites. Small radiolabeled constructs provide more accurate information on total receptor expression in tumors and reveal the need for higher antibody doses for target receptor blockade.

  18. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 22.402 Applicability. (a) Contracts for construction work. (1) The requirements of this subpart apply— (i) Only if the construction work is, or reasonably can be foreseen to be, performed at a particular site so that wage rates can be determined for the locality, and only to construction work that is...

  19. Mojo Hand, a TALEN design tool for genome editing applications.

    PubMed

    Neff, Kevin L; Argue, David P; Ma, Alvin C; Lee, Han B; Clark, Karl J; Ekker, Stephen C

    2013-01-16

    Recent studies of transcription activator-like (TAL) effector domains fused to nucleases (TALENs) demonstrate enormous potential for genome editing. Effective design of TALENs requires a combination of selecting appropriate genetic features, finding pairs of binding sites based on a consensus sequence, and, in some cases, identifying endogenous restriction sites for downstream molecular genetic applications. We present the web-based program Mojo Hand for designing TAL and TALEN constructs for genome editing applications (http://www.talendesign.org). We describe the algorithm and its implementation. The features of Mojo Hand include (1) automatic download of genomic data from the National Center for Biotechnology Information, (2) analysis of any DNA sequence to reveal pairs of binding sites based on a user-defined template, (3) selection of restriction-enzyme recognition sites in the spacer between the TAL monomer binding sites including options for the selection of restriction enzyme suppliers, and (4) output files designed for subsequent TALEN construction using the Golden Gate assembly method. Mojo Hand enables the rapid identification of TAL binding sites for use in TALEN design. The assembly of TALEN constructs, is also simplified by using the TAL-site prediction program in conjunction with a spreadsheet management aid of reagent concentrations and TALEN formulation. Mojo Hand enables scientists to more rapidly deploy TALENs for genome editing applications.

  20. Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong.

    PubMed

    Hossain, Md Uzzal; Wu, Zezhou; Poon, Chi Sun

    2017-11-01

    This study aimed to compare the environmental performance of building construction waste management (CWM) systems in Hong Kong. Life cycle assessment (LCA) approach was applied to evaluate the performance of CWM systems holistically based on primary data collected from two real building construction sites and secondary data obtained from the literature. Different waste recovery rates were applied based on compositions and material flow to assess the influence on the environmental performance of CWM systems. The system boundary includes all stages of the life cycle of building construction waste (including transportation, sorting, public fill or landfill disposal, recovery and reuse, and transformation and valorization into secondary products). A substitutional LCA approach was applied for capturing the environmental gains due to the utilizations of recovered materials. The results showed that the CWM system by using off-site sorting and direct landfilling resulted in significant environmental impacts. However, a considerable net environmental benefit was observed through an on-site sorting system. For example, about 18-30kg CO 2 eq. greenhouse gases (GHGs) emission were induced for managing 1 t of construction waste through off-site sorting and direct landfilling, whereas significant GHGs emission could be potentially avoided (considered as a credit -126 to -182kg CO 2 eq.) for an on-site sorting system due to the higher recycling potential. Although the environmental benefits mainly depend on the waste compositions and their sortability, the analysis conducted in this study can serve as guidelines to design an effective and resource-efficient building CWM system. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  2. Cre recombinase-mediated site-specific recombination between plant chromosomes.

    PubMed Central

    Qin, M; Bayley, C; Stockton, T; Ow, D W

    1994-01-01

    We report the use of the bacteriophage P1 Cre-lox system for generating conservative site-specific recombination between tobacco chromosomes. Two constructs, one containing a promoterless hygromycin-resistance gene preceded by a lox site (lox-hpt) and the other containing a cauliflower mosaic virus 35S promoter linked to a lox sequence and the cre coding region (35S-lox-cre), were introduced separately into tobacco plants. Crosses between plants harboring either construct produced plants with the two constructs situated on different chromosomes. Plants with recombination events were identified by selecting for hygromycin resistance, a phenotype expressed upon recombination. Molecular analysis showed that these recombination events occurred specifically at the lox sites and resulted in the reciprocal exchange of flanking host DNA. Progenies of these plants showed 67-100% cotransmission of the new transgenes, 35S-lox-hpt and lox-cre, consistent with the preferential cosegregation of translocated chromosomes. These results illustrate that site-specific recombination systems can be useful tools for the large-scale manipulation of eukaryotic chromosomes in vivo. Images PMID:8127869

  3. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies

    PubMed Central

    Cheung, Weng-Fong; Lin, Tzu-Hsuan; Lin, Yu-Cheng

    2018-01-01

    In recent years, many studies have focused on the application of advanced technology as a way to improve management of construction safety management. A Wireless Sensor Network (WSN), one of the key technologies in Internet of Things (IoT) development, enables objects and devices to sense and communicate environmental conditions; Building Information Modeling (BIM), a revolutionary technology in construction, integrates database and geometry into a digital model which provides a visualized way in all construction lifecycle management. This paper integrates BIM and WSN into a unique system which enables the construction site to visually monitor the safety status via a spatial, colored interface and remove any hazardous gas automatically. Many wireless sensor nodes were placed on an underground construction site and to collect hazardous gas level and environmental condition (temperature and humidity) data, and in any region where an abnormal status is detected, the BIM model will alert the region and an alarm and ventilator on site will start automatically for warning and removing the hazard. The proposed system can greatly enhance the efficiency in construction safety management and provide an important reference information in rescue tasks. Finally, a case study demonstrates the applicability of the proposed system and the practical benefits, limitations, conclusions, and suggestions are summarized for further applications. PMID:29393887

  4. Safety concerns related to modular/prefabricated building construction.

    PubMed

    Fard, Maryam Mirhadi; Terouhid, Seyyed Amin; Kibert, Charles J; Hakim, Hamed

    2017-03-01

    The US construction industry annually experiences a relatively high rate of fatalities and injuries; therefore, improving safety practices should be considered a top priority for this industry. Modular/prefabricated building construction is a construction strategy that involves manufacturing of the whole building or some of its components off-site. This research focuses on the safety performance of the modular/prefabricated building construction sector during both manufacturing and on-site processes. This safety evaluation can serve as the starting point for improving the safety performance of this sector. Research was conducted based on Occupational Safety and Health Administration investigated accidents. The study found 125 accidents related to modular/prefabricated building construction. The details of each accident were closely examined to identify the types of injury and underlying causes. Out of 125 accidents, there were 48 fatalities (38.4%), 63 hospitalized injuries (50.4%), and 14 non-hospitalized injuries (11.2%). It was found that, the most common type of injury in modular/prefabricated construction was 'fracture', and the most common cause of accidents was 'fall'. The most frequent cause of cause (underlying and root cause) was 'unstable structure'. In this research, the accidents were also examined in terms of corresponding location, occupation, equipment as well as activities during which the accidents occurred. For improving safety records of the modular/prefabricated construction sector, this study recommends that future research be conducted on stabilizing structures during their lifting, storing, and permanent installation, securing fall protection systems during on-site assembly of components while working from heights, and developing training programmes and standards focused on modular/prefabricated construction.

  5. Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White III, Chelsea C.; Petrovic, Bojan

    Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less

  6. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    PubMed

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  7. An investigation and analysis of safety issues in Polish small construction plants.

    PubMed

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.

  8. An investigation and analysis of safety issues in Polish small construction plants

    PubMed Central

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety. PMID:26694002

  9. Protection of Workers and Third Parties during the Construction of Linear Structures

    NASA Astrophysics Data System (ADS)

    Vlčková, Jitka; Venkrbec, Václav; Henková, Svatava; Chromý, Adam

    2017-12-01

    The minimization of risk in the workplace through a focus on occupational health and safety (OHS) is one of the primary objectives for every construction project. The most serious accidents in the construction industry occur during work on earthworks and linear structures. The character of such structures places them among those posing the greatest threat to the public (referred to as “third parties”). They can be characterized as large structures whose construction may involve the building site extending in a narrow lane alongside previously constructed objects currently in use by the public. Linear structures are often directly connected to existing objects or buildings, making it impossible to guard the whole construction site. However, many OHS problems related to linear structures can be prevented during the design stage. The aim of this article is to introduce a new methodology which has been implemented into a computer program that deals with safety measures at construction sites where work is performed on linear structures. Based on existing experience with the design of such structures and their execution and supervision by safety coordinators, the basic types of linear structures, their location in the terrain, the conditions present during their execution and other marginal conditions and influences were modelled. Basic safety information has been assigned to this elementary information, which is strictly necessary for the construction process. The safety provisions can be grouped according to type, e.g. technical, organizational and other necessary documentation, or into sets of provisions concerning areas such as construction site safety, transport safety, earthworks safety, etc. The selection of the given provisions takes place using multiple criteria. The aim of creating this program is to provide a practical tool for designers, contractors and construction companies. The model can contribute to the sufficient awareness of these participants about technical and organizational provisions that can help them to meet workplace safety requirements. The software for the selection of safety provisions also contains module that can calculate necessary cost estimates using a calculation formula chosen by the user. All software data conform to European standards harmonized for the Czech Republic.

  10. Visual warning system for worker safety on roadside work-zones.

    DOT National Transportation Integrated Search

    2016-08-01

    Growing traffic on US roadways and heavy construction machinery on road construction sites pose a critical safety : threat to construction workers. This report summarizes the design and development of a worker safety system using : Dedicated Short Ra...

  11. Differences among Job Positions Related to Communication Errors at Construction Sites

    NASA Astrophysics Data System (ADS)

    Takahashi, Akiko; Ishida, Toshiro

    In a previous study, we classified the communicatio n errors at construction sites as faulty intention and message pattern, inadequate channel pattern, and faulty comprehension pattern. This study seeks to evaluate the degree of risk of communication errors and to investigate differences among people in various job positions in perception of communication error risk . Questionnaires based on the previous study were a dministered to construction workers (n=811; 149 adminis trators, 208 foremen and 454 workers). Administrators evaluated all patterns of communication error risk equally. However, foremen and workers evaluated communication error risk differently in each pattern. The common contributing factors to all patterns wer e inadequate arrangements before work and inadequate confirmation. Some factors were common among patterns but other factors were particular to a specific pattern. To help prevent future accidents at construction sites, administrators should understand how people in various job positions perceive communication errors and propose human factors measures to prevent such errors.

  12. Exploring Leadership Capability Team Leaders for Construction Industry in Malaysia: Training and Experience

    NASA Astrophysics Data System (ADS)

    Muda, W. H. N. Wan; Halim, F. Ab; Libunao, W. H.

    2017-08-01

    It has been said that the construction industry must unleash its potential as a source of wealth creation and provide opportunity for the betterment of quality of life. In ensuring the quality of workmanship at construction sites, supervisory skills of site supervisors need to be enhanced. It stressed out that to match business growth and excellence overseas, we must recognize and act on the importance of continuously developing niche expertise and capabilities. Undoubtedly, the role of research in determining the specific leadership skills and the needed core capabilities cannot be over-emphasized. In ensuring the quality of workmanship at construction sites, leadership skills especially supervisory skill for site supervisors need to be enhanced. In this study, quantitative research design with survey questionnaire was used to collect the data and simple random sampling was employed in selecting 248 respondents involving team leaders in construction industry from whole of Malaysia. The data was analyzed using descriptive and inferential statistics; ANOVA in SPSS 21.0. Training and experience in leadership has been found to be significance to leadership capability of team leaders. The opinions from the respondents also indicated that they need the training of leadership and they had to enhance themselves to enable them to become better and more competitive leaders. The results of this assessment can pinpoint the areas needing improvement and therefore can be used as basis in designing and/or deciding development programmes. This study also found that generally the team leaders in construction industry needed more opportunities to expand their leadership capability to become the effective leaders in future.

  13. Effects of highway construction on stream water quality and macroinvertebrate condition in a mid-atlantic highlands watershed, USA.

    PubMed

    Chen, Yushun; Viadero, Roger C; Wei, Xinchao; Fortney, Ronald; Hedrick, Lara B; Welsh, Stuart A; Anderson, James T; Lin, Lian-Shin

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.

  14. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  15. Worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry

    NASA Astrophysics Data System (ADS)

    Hafiidz, J. Mohd; Arifin, K.; Aiyub, K.; Razman, M. R.; Samsurijan, M. S.; Syakir, M. I.

    2017-09-01

    Construction industry is an important sector that contributes to the development of economy and socioeconomy in Malaysia. It is a vital component in achieving the developed country status. However, fatalities in the Malaysian construction industry are a critical problem. Number of fatalities in this industry is the highest compared to other industries registered in Malaysia under the investigation of Department of Occupational Safety and Health (DOSH). Worksite element (worksite conditions, poor site management, construction tasks, and equipment & materials) was identified as one category of causes of occupational accidents and illnesses in Malaysian construction industry. The main objective of this study is to understand the perception of local construction personnel in terms of worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry. 13 housing projects that were registered with Ministry of Urban Wellbeing, Housing and Local Government and being permitted to perform construction work in 2012 were selected in Pulau Pinang to be studied using questionnaire survey. Worksite condition and poor site management was perceived as the most significant with the mean values of 3.68 and 3.61 respectively.

  16. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  17. Rules and Regulations: Minimum Schoolhouse Construction Standards.

    ERIC Educational Resources Information Center

    Arkansas State Dept. of Education, Little Rock.

    Regulatory guidelines governing the minimum schoolhouse construction standards as well as rules for new construction applications, school site selection, and approval procedures are presented. Appendices (comprising 95 percent of the publication) document the following: educational space guidelines; planning for modern education; school…

  18. A new algorithm for construction of coarse-grained sites of large biomolecules.

    PubMed

    Li, Min; Zhang, John Z H; Xia, Fei

    2016-04-05

    The development of coarse-grained (CG) models for large biomolecules remains a challenge in multiscale simulations, including a rigorous definition of CG representations for them. In this work, we proposed a new stepwise optimization imposed with the boundary-constraint (SOBC) algorithm to construct the CG sites of large biomolecules, based on the s cheme of essential dynamics CG. By means of SOBC, we can rigorously derive the CG representations of biomolecules with less computational cost. The SOBC is particularly efficient for the CG definition of large systems with thousands of residues. The resulted CG sites can be parameterized as a CG model using the normal mode analysis based fluctuation matching method. Through normal mode analysis, the obtained modes of CG model can accurately reflect the functionally related slow motions of biomolecules. The SOBC algorithm can be used for the construction of CG sites of large biomolecules such as F-actin and for the study of mechanical properties of biomaterials. © 2015 Wiley Periodicals, Inc.

  19. The Reach of Linear Protein-DNA Dimerizers

    PubMed Central

    Stafford, Ryan L.; Dervan, Peter B.

    2008-01-01

    A protein-DNA dimerizer constructed from a DNA-binding pyrrole-imidazole polyamide and the peptide FYPWMK facilitates binding of the natural transcription factor Exd to an adjacent DNA site. Previous dimerizers have been constructed with the peptide attached to an internal pyrrole monomer in an overall branched oligomer. Linear oligomers constructed by attaching the peptide to the polyamide C-terminus expand the range of protein-DNA dimerization to six additional DNA sites. Replacing the FYPWMK hexapeptide with a WM dipeptide, which was previously functional in branched compounds, does not lead to a functional linear dimerizer. Instead, inserting an additional lysine generates a minimal, linear WMK tripeptide conjugate that maintains the activity of the larger FYPWMK dimerizers in a single DNA-binding site orientation. These studies provide insight into the importance of linker length and composition, binding site spacing and orientation, and the protein-binding domain content that are important for the optimization of protein DNA-dimerizers suitable for biological experiments. PMID:17949089

  20. Records of wells and test holes in the Nevada Test Site and vicinity (through December 1966)

    USGS Publications Warehouse

    Thordarson, William; Young, R.A.; Winograd, I.J.

    1967-01-01

    Hydrogeologic and construction data obtained from 119 test holes, wells, and emplacement holes at the Nevada Test Site and vicinity (through December 1966) are tabulated. The availability of cuttings, cores, lithologic logs, geophysical logs, formation-water analyses, hydraulic test data, and detailed construction data for each hole, as well as references to published reports for selected holes, are noted.

  1. 10 CFR 960.3-4 - Environmental impacts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Implementation Guidelines § 960.3-4 Environmental impacts. Environmental impacts shall be considered by the DOE throughout the site characterization, site selection, and repository development..., during site characterization and repository construction, operation, closure, and decommissioning. ...

  2. 7 CFR 1924.119 - Site Loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Site Loans. 1924.119 Section 1924.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.119 Site Loans. Subdivisions...

  3. NOA at the Calaveras Dam Replacement Project (CDRP) - Challenges and Solutions

    NASA Astrophysics Data System (ADS)

    Erskine, B.

    2012-12-01

    The San Francisco Public Utilities Commission is one year into construction of the Calaveras Dam Replacement Project (CDRP), a new earthen dam east of Sunol designed to withstand an M 7.1 earthquake on the nearby active Calaveras fault. The zoned earthen dam will be constructed primarily of on-site materials, many of which contain NOA. The upstream shell will be composed of Franciscan complex blueschist which contains crocidolite. This material will be blasted and processed at an on-site quarry. The impermeable core of the dam will be constructed of clay-rich alluvium that contains asbestos derived from Franciscan rocks. This material will be excavated from the south end of the reservoir and transported several miles to the dam. Currently, approximately 3 million yards of Franciscan complex material is being excavated and disposed of within permitted on-site engineered landfills. NOA-bearing rocks that include serpentinite, greenschist, blueschist, and eclogite contain variable amounts and assemblages of chrysotile, actinolite, crocidolite, tremolite, and winchite-class amphiboles. All of these are detected in air samples collected within a sophisticated air monitoring array and analyzed by TEM. The CDRP represents the largest construction project involving NOA in the country. As such, applying regulations that were designed for building materials and routine construction sites, and controlling airborne emissions on such a massive scale, is a major challenge requiring innovative solutions. Because construction occurs simultaneously at distinct and distant parts of the site, and the rugged topography of the site induces complex meteorological conditions, it is sometimes difficult to ascertain the driving activity and location of a source that caused a trigger level exceedance at a perimeter monitoring station. One helpful tool is forensic correlation of source material and air test data using speciation of amphiboles. At the CDRP, we are developing the ability to correlate rock mineralogy at a location with the species of amphiboles identified on air samples using TEM. Using amphibole species as a fingerprinting tool, we have been successful in determining whether an exceedance of a trigger level was caused from onsite or offsite sources. In one case, multiple exceedances by an unusual mix of chrysotile and amphiboles (crocidolite, actinolite, tremolite, and Libby-class amphiboles in the same sample) narrowed the source to one of two locations: Disposal Site 3 where a mix of materials from the entire site is disposed of, and water recycled in the decontamination zone wheel wash equipment. Using perimeter air monitoring around and between each location it was possible to identify the wheel wash as the source. As a result, the wheel wash system, track out procedures, and road wetting protocol have been re-engineered to eliminate the potential for significant offsite emissions. These and other examples will describe how the SFPUC NOA team is managing the field determination of NOA, on-site control measures, and perimeter air monitoring to assure that construction is conducted in a safe manner and no offsite exposures to the public occur.

  4. Channel erosion surveys along TAPS route, Alaska, 1974

    USGS Publications Warehouse

    Childers, Joseph; Jones, Stanley H.

    1975-01-01

    Repeated site surveys and aerial photographs at 26 stream crossings along the trans-Alaska pipeline system (TAPS) route during the period 1969-74 provide chronologie records of channel changes that predate pipeline-related construction at the sites. The 1974 surveys and photographs show some of the channel changes wrought by construction of the haul road from the Yukon River to Prudhoe Bay and by construction of camps and working pads all along the pipeline route. No pipeline crossings were constructed before 1975. These records of channel changes together with flood and icing measurements are part of the United States Department of the lnterior's continuing surveillance program to document the hydrologic aspects of the trans-Alaska pipeline and its environmental impacts.

  5. Mississippi lieutenant governor visits Stennis

    NASA Image and Video Library

    2009-10-01

    Stennis Space Center Director Gene Goldman (left) stands with Mississippi Lt. Gov. Phil Bryant at the A-3 Test Stand construction site during an Oct. 1 visit by the state official. During his tour, Bryant was updated on construction of the first large test stand at Stennis since the 1960s. The A-3 stand will be used to conduct simulated high-altitude testing on the next generation of rocket engines that will take humans back to the moon and possibly beyond. In addition to touring Stennis facilities, Bryant visited the INFINITY Science Center construction site, where he was updated on work under way to construct a 72,000-square-foot facility that will showcase the science underpinning the missions of NASA and resident agencies at Stennis.

  6. Microbial Community Structure and Diversity in an Integrated System of Anaerobic-Aerobic Reactors and a Constructed Wetland for the Treatment of Tannery Wastewater in Modjo, Ethiopia

    PubMed Central

    Desta, Adey Feleke; Assefa, Fassil; Leta, Seyoum; Stomeo, Francesca; Wamalwa, Mark; Njahira, Moses; Appolinaire, Djikeng

    2014-01-01

    A culture-independent approach was used to elucidate the microbial diversity and structure in the anaerobic-aerobic reactors integrated with a constructed wetland for the treatment of tannery wastewater in Modjo town, Ethiopia. The system has been running with removal efficiencies ranging from 94%–96% for COD, 91%–100% for SO42- and S2-, 92%–94% for BOD, 56%–82% for total Nitrogen and 2%–90% for NH3-N. 16S rRNA gene clone libraries were constructed and microbial community assemblies were determined by analysis of a total of 801 unique clone sequences from all the sites. Operational Taxonomic Unit (OTU) - based analysis of the sequences revealed highly diverse communities in each of the reactors and the constructed wetland. A total of 32 phylotypes were identified with the dominant members affiliated to Clostridia (33%), Betaproteobacteria (10%), Bacteroidia (10%), Deltaproteobacteria (9%) and Gammaproteobacteria (6%). Sequences affiliated to the class Clostridia were the most abundant across all sites. The 801 sequences were assigned to 255 OTUs, of which 3 OTUs were shared among the clone libraries from all sites. The shared OTUs comprised 80 sequences belonging to Clostridiales Family XIII Incertae Sedis, Bacteroidetes and unclassified bacterial group. Significantly different communities were harbored by the anaerobic, aerobic and rhizosphere sites of the constructed wetland. Numerous representative genera of the dominant bacterial classes obtained from the different sample sites of the integrated system have been implicated in the removal of various carbon- containing pollutants of natural and synthetic origins. To our knowledge, this is the first report of microbial community structure in tannery wastewater treatment plant from Ethiopia. PMID:25541981

  7. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  8. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  9. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  10. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  11. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  12. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    NASA Astrophysics Data System (ADS)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  13. Comparisons of mosquito populations before and after construction of a wetland for water quality improvement in Pitt County, North Carolina, and data-reliant vectorborne disease management.

    PubMed

    Anderson, Alice L; O'Brien, Kevin; Hartwell, Megan

    2007-04-01

    Wetlands serve an important purpose in flood control and water quality, but constructed-wetland sites also provide habitats for mosquito breeding. Communities near constructed-wetland sites often raise a "mosquito" objection when constructed wetlands are proposed. Wildlife and wetland advocates can confuse the public by making unsubstantiated claims about natural predators eliminating or controlling mosquito problems in a constructed wetland. Management of constructed-wetland mosquito habitat, with adequate mosquito surveillance and data analysis, can help lead to a successful project and satisfied citizens. The cooperative project described in this paper, was conducted in the town of Simpson, North Carolina, and was designed to determine the mosquito population impact of wetland construction at Mill Branch Stream, a small tributary of the Tar River in Eastern North Carolina. In the authors' analysis of three years of mosquito surveillance data, month (time of year standing in for temperature and day length) was a significant factor in regression analysis for mosquito numbers, but rainfall was not. Numbers of mosquitoes were not found to be significantly higher after construction than before construction.

  14. Alterations of chemical composition, construction cost and payback time in needles of Masson pine (Pinus massoniana L.) trees grown under pollution.

    PubMed

    Liu, Nan; Guan, Lan-Lan; Sun, Fang-Fang; Wen, Da-Zhi

    2014-07-01

    Previous studies show that Masson pine (Pinus massoniana L.) stands grown at the industrially-polluted site have experienced unprecedented growth decline, but the causal mechanisms are poorly understood. In this study, to understand the mechanisms of growth decline of Mason pine strands under pollution stresses, we determined the reactive oxygen species levels and chemical composition of the current-year (C) and one-year-old (C + 1) needles, and calculated the needle construction costs (CCmass) of Masson pine trees grown at an industrially-polluted site and an unpolluted remote site. Pine trees grown at the polluted site had significantly higher levels of hydroxyl radical and superoxide anion in their needles than those grown at the unpolluted site, and the former trees eventually exhibited needle early senescence. The contents of lipids, soluble phenolics and lignins in C and C + 1 needles were significantly higher at the polluted site than at the unpolluted site, but the total amounts of non-construction carbohydrates were lower in non-polluted needles than in polluted needles. Elevated levels of the reactive oxygen species and early senescence in polluted needles together led to significant increases in CCmass and a longer payback time. We infer that the lengthened payback time and needle early senescence under pollution stress may reduce the Masson pine tree growth and consequently accelerate tree decline.

  15. 24 CFR 583.320 - Site control.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Site control. 583.320 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583.320 Site control. (a) Site control. (1) Where grant funds will be used for acquisition, rehabilitation, or new construction...

  16. 24 CFR 583.320 - Site control.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Site control. 583.320 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583.320 Site control. (a) Site control. (1) Where grant funds will be used for acquisition, rehabilitation, or new construction...

  17. 24 CFR 583.320 - Site control.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Site control. 583.320 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583.320 Site control. (a) Site control. (1) Where grant funds will be used for acquisition, rehabilitation, or new construction...

  18. 24 CFR 583.320 - Site control.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Site control. 583.320 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583.320 Site control. (a) Site control. (1) Where grant funds will be used for acquisition, rehabilitation, or new construction...

  19. 24 CFR 583.320 - Site control.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Site control. 583.320 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583.320 Site control. (a) Site control. (1) Where grant funds will be used for acquisition, rehabilitation, or new construction...

  20. ["This conversation is professional, [...] I am a painter!": resistence at a construction site].

    PubMed

    Landerdahl, Maria Celeste; Cortes, Laura Ferreira; Padoin, Stela Maris de Mello; Villela, Wilza Vieira

    2015-01-01

    to be familiar with the work relationships between females and their male colleagues at a construction site in the municipality of Santa Maria, RS. Exploratory research, qualitative approach with a female worker of a construction site in August 2012. Oral history as a device for data production. Analysis of French tradition speech as an analytical device. Work relationship with stances of resistance, with major fights against power of male order, pointing to shifts and continuities in the test for new gender behaviors. The conquest of spaces in paid work is not enough to achieve balance in gender relations; public policies on gender sensitizing contribute to changes in the cultural field by understanding that equal rights and opportunities between men and women are a basic condition for achieving justice, citizenship and development.

  1. Evaluation of physical activity web sites for use of behavior change theories.

    PubMed

    Doshi, Amol; Patrick, Kevin; Sallis, James F; Calfas, Karen

    2003-01-01

    Physical activity (PA) Web sites were assessed for their use of behavior change theories, including constructs of the health belief model, Transtheoretical Model, social cognitive theory, and the theory of reasoned action and planned behavior. An evaluation template for assessing PA Web sites was developed, and content validity and interrater reliability were demonstrated. Two independent raters evaluated 24 PA Web sites. Web sites varied widely in application of theory-based constructs, ranging from 5 to 48 on a 100-point scale. The most common intervention strategies were general information, social support, and realistic goal areas. Coverage of theory-based strategies was low, varying from 26% for social cognitive theory to 39% for health belief model. Overall, PA Web sites provided little assessment, feedback, or individually tailored assistance for users. They were unable to substantially tailor the on-line experience for users at different stages of change or different demographic characteristics.

  2. Construction equipment and motor vehicle related injuries on construction sites in Turkey.

    PubMed

    Gürcanli, G Emre; Müngen, Ugur; Akad, Murat

    2008-08-01

    Research on occupational accidents on construction sites in Turkey is very few. Moreover, research on motor vehicle and equipment accidents also do not exist. Investigation in the scope of this study shows that after falls and contact with electricity, accidents involving heavy equipment and motor vehicles rank third and fourth, respectively. This study aims to reveal the characteristics of these types of accidents, deduct the prominent causes that lead to fatalities as well as permanent disabilities using the present data. With the aid of obtained results, recommendations are made for safety experts on how to derive data from insufficient sources in Turkey and to evaluate these data for prevention and mitigation of the risks that construction workers are exposed to. 168 fatal and 38 non-fatal traffic accident-caused incidents as well as 206 fatal and 97 non-fatal construction equipment accidents, which were selected from official statistics and expert reports, were taken into consideration. Analysis and classification of these accidents were done according to the way they happened, the type of construction site and the occupation of the victims. Moreover, the leading causes of fatal and non-fatal injuries, to which drivers, operators and co-operators are exposed, are presented. Critical findings concerning prominent ways of occurrence, type of construction work and occupation are presented; and a number of measures for reducing the present risks are suggested. Some approaches for analysing relevant data are proposed for further research.

  3. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  4. Perspectives of construction robots

    NASA Astrophysics Data System (ADS)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  5. A retrospective tiered environmental assessment of the Mount Storm Wind Energy Facility, West Virginia,USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Efroymson, Rebecca Ann; Day, Robin; Strickland, M. Dale

    Bird and bat fatalities from wind energy projects are an environmental and public concern, with post-construction fatalities sometimes differing from predictions. Siting facilities in this context can be a challenge. In March 2012 the U.S. Fish and Wildlife Service (USFWS) released Land-based Wind Energy Guidelines to assess collision fatalities and other potential impacts to species of concern and their habitats to aid in siting and management. The Guidelines recommend a tiered approach for assessing risk to wildlife, including a preliminary site evaluation that may evaluate alternative sites, a site characterization, field studies to document wildlife and habitat and to predictmore » project impacts, post construction studies to estimate impacts, and other post construction studies. We applied the tiered assessment framework to a case study site, the Mount Storm Wind Energy Facility in Grant County, West Virginia, USA, to demonstrate the use of the USFWS assessment approach, to indicate how the use of a tiered assessment framework might have altered outputs of wildlife assessments previously undertaken for the case study site, and to assess benefits of a tiered ecological assessment framework for siting wind energy facilities. The conclusions of this tiered assessment for birds are similar to those of previous environmental assessments for Mount Storm. This assessment found risk to individual migratory tree-roosting bats that was not emphasized in previous preconstruction assessments. Differences compared to previous environmental assessments are more related to knowledge accrued in the past 10 years rather than to the tiered structure of the Guidelines. Benefits of the tiered assessment framework include good communication among stakeholders, clear decision points, a standard assessment trajectory, narrowing the list of species of concern, improving study protocols, promoting consideration of population-level effects, promoting adaptive management through post-construction assessment and mitigation, and sharing information that can be used in other assessments.« less

  6. 18. Photographic copy of site plan for additions to North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Plan, February 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  7. Architectural: Construction, Supervision, and Inspection. Course of Study.

    ERIC Educational Resources Information Center

    Robson, Frank

    This architectural course of study is part of a construction, supervision, and inspection series, which provides instructional materials for community or junior college technical courses in the inspection program. Material covered pertains to: construction contracts, schedules, and site preparation; footings and foundations; masonry and…

  8. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  9. Curriculum Guide Construction Cluster.

    ERIC Educational Resources Information Center

    Kline, Ken

    As part of a model construction cluster curriculum development project, this guide was developed and implemented in the Beaverton (Oregon) School District. The curriculum guide contains 16 units covering the following topics: introduction to construction jobs; safety and first aid; blueprint readings; basic mathematics; site work; framing; roofing…

  10. Climatic and psychosocial risks of heat illness incidents on construction site.

    PubMed

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  11. A cluster randomized pilot trial of a tailored worksite smoking cessation intervention targeting Hispanic/Latino construction workers: Intervention development and research design.

    PubMed

    Asfar, Taghrid; Caban-Martinez, Alberto J; McClure, Laura A; Ruano-Herreria, Estefania C; Sierra, Danielle; Gilford Clark, G; Samano, Daniel; Dietz, Noella A; Ward, Kenneth D; Arheart, Kristopher L; Lee, David J

    2018-04-01

    Construction workers have the highest smoking rate among all occupations (39%). Hispanic/Latino workers constitute a large and increasing group in the US construction industry (over 2.6 million; 23% of all workers). These minority workers have lower cessation rates compared to other groups due to their limited access to cessation services, and lack of smoking cessation interventions adapted to their culture and work/life circumstances. Formative research was conducted to create an intervention targeting Hispanic/Latino construction workers. This paper describes the intervention development and the design, methods, and data analysis plans for an ongoing cluster pilot two-arm randomized controlled trial comparing an Enhanced Care worksite cessation program to Standard Care. Fourteen construction sites will be randomized to either Enhanced Care or Standard Care and 126 participants (63/arm) will be recruited. In both arms, recruitment and intervention delivery occur around "food trucks" that regularly visit the construction sites. Participants at Enhanced Care sites will receive the developed intervention consisting of a single face-to-face group counseling session, 2 phone calls, and a fax referral to Florida tobacco quitline (QL). Participants at Standard Care sites will receive a fax referral to the QL. Both groups will receive eight weeks of nicotine replacement treatment and two follow-up assessments at three and six months. Feasibility outcomes are estimated recruitment yield, barriers to delivering the intervention onsite, and rates of adherence/compliance to the intervention, follow-ups, and QL enrollment. Efficacy outcomes are point-prevalence and prolonged abstinence rates at six month follow-up confirmed by saliva cotinine <15 ng/ml. Copyright © 2018. Published by Elsevier Inc.

  12. Physical Exposures, Work Tasks, and OSHA-10 Training Among Temporary and Payroll Construction Workers.

    PubMed

    Caban-Martinez, Alberto J; Santiago, Katerina M; Stillman, Jordan; Moore, Kevin J; Sierra, Danielle A; Chalmers, Juanita; Baniak, Melissa; Jordan, Melissa M

    2018-04-01

    We characterize and compare the self-reported physical exposures, work tasks, and OSHA-10 training in a non-probabilistic sample of temporary and payroll construction workers. In June 2016, a total of 250 payroll and temporary general laborers employed at Florida construction sites completed a survey at the job site as part of the falls reported among minority employees (FRAME) study. Workers employed through temp agencies (57.1%) were significantly more likely to report moving or lifting materials more than 100 pounds than payroll workers (38.5%; P < 0.01). Temporary construction workers with 10-hour OSHA training (22.2%) spent significantly less time with intense hand use/awkward hand posture than temporary workers without 10-hour OSHA training (46.9%; P = 0.048). Temp construction workers with OSHA 10-hour training reported less hazardous physical postures than workers without the same training.

  13. Forecasting of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Hf; Lafayette, Kalinny Pv

    2016-08-01

    The objective of this article is to develop a computerised tool (software) that facilitates the analysis of strategies for waste management on construction sites through the use of indicators of construction and demolition waste generation. The development involved the following steps: knowledge acquisition, structuring the system, coding and system evaluation. The step of knowledge acquisition aims to provide subsidies for the representation of them through models. In the step of structuring the system, it was presented the structuring and formalisation of knowledge for the development of the system, and has two stages: the construction of the conceptual model and the subsequent instantiation of the model. The coding system aims to implement (code) the conceptual model developed in a model played by computer (digital). The results showed that the system is very useful and applicable in construction sites, helping to improve the quality of waste management, and creating a database that will support new research. © The Author(s) 2016.

  14. Current-day matters of administration and law in the field of high-rise construction

    NASA Astrophysics Data System (ADS)

    Voskresenskaya, Elena; Snetkov, Vitaly; Tebryaev, Alexander

    2018-03-01

    The article touches upon main reasons for high-rise construction: increase in energy consumption and limited availability of site in the big cities of Russia. Increase in energy consumption is related with construction, transportation and applying of ventilation and air conditioning systems. Nowadays, there are developed a lot of design and engineer solutions, that include autonomous systems as well as passive methods with low energy consumption rate, which are interrelated with local climate conditions. Certain architectural solutions contribute to energy consumption decrease: building orientation with respect to the cardinal directions, taking into account the prevailing cold wind directions, maximum glazing of the southern facades and minimum glazing of the northern ones, what plays a big role in hard climate conditions. Limited availability of site for construction in the big cities resulted in rapid development of the high-rise construction, which today prevails in terms of quantitative indicators of civil engineering.

  15. Garden Grove's Newsy Web Site Wins Honors

    ERIC Educational Resources Information Center

    Tech Directions, 2009

    2009-01-01

    This article details the construction and content of the Garden Grove (CA) High School Web site. The site wins the January 2009 "Tech Directions" Web Site of the Month. It provides information on the school's academic programs, administrative and teaching staff, guidance department, and athletics and other extracurricular activities, in addition…

  16. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    NASA Astrophysics Data System (ADS)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  17. Effects of highway construction on stream water quality and macroinvertebrate condition in a mid-Atlantic highlands watershed, USA

    USGS Publications Warehouse

    Welsh, Stuart A.; Chen, Yushun; Viadero, Stuart C.; Wei, Xinchao; Hedrick, Lara B.; Anderson, James T.; Lin, Lian-Shin

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997–2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.

  18. Report: Congressional Request on Funding Needs for Non-Federal Superfund Sites

    EPA Pesticide Factsheets

    Report #2004-P-00001, January 7, 2004. During FY 2003, limited funding prevented EPA from beginning construction at all sites or providing additional funds needed to address sites in a manner believed necessary by regional officials.

  19. FIELD STUDIES OF GEOMEMBRANE INSTALLATION TECHNIQUES

    EPA Science Inventory

    Fourteen construction sites where geomembranes were being installed were visited to observe subgrade preparation and liner installation techniques. These sites were visited during a study conducted for the U.S. EPA, Solid and Hazardous Waste Research Division. The sites included ...

  20. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... which will contribute to the preservation and enhancement of sites, structures, and objects of...-96-1, “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” 1987 Edition.... Owners may accomplish construction by using their own personnel and equipment provided the owners possess...

  1. The phage integrase vector pIPI03 allows RecA-independent, site-specific labelling of Staphylococcus lugdunensis strains.

    PubMed

    Heilbronner, Simon; Monk, Ian R; Foster, Timothy J

    2013-11-01

    Staphylococcus lugdunensis is a coagulase negative staphylococcus that is a commensal of man and an opportunistic pathogen. A site-specific integrative plasmid for the use in S. lugdunensis was constructed and validated. The integrase gene ccrB of bacteriophage ϕSL01 together with its attachment site was cloned into the thermosensitive plasmid pIMAY. The resulting plasmid pIPI03 integrated RecA-independently, site-specifically and irreversibly into the S. lugdunensis chromosome. Two IPTG-inducible antibiotic resistance determinants were cloned into pIPI03 and the derivatives were used to construct strains suitable for competitive growth experiments in both in vitro and in vivo. Copyright © 2013 Elsevier Inc. All rights reserved.

  2. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    PubMed

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, P<0.001), enhanced safety behavior (β=0.15, P<0.001), and fewer accidents [odds ratio (OR) 0.78, 95% confidence interval (95% CI) 0.62-0.98]. The effect of rule-oriented leadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, P<0.001), suggesting that when rules and plans are established in a collaborative manner, workers' motivation to comply with safety regulations and participate in proactive safety activities is elevated. The influence of leadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  3. Graphical fault tree analysis for fatal falls in the construction industry.

    PubMed

    Chi, Chia-Fen; Lin, Syuan-Zih; Dewi, Ratna Sari

    2014-11-01

    The current study applied a fault tree analysis to represent the causal relationships among events and causes that contributed to fatal falls in the construction industry. Four hundred and eleven work-related fatalities in the Taiwanese construction industry were analyzed in terms of age, gender, experience, falling site, falling height, company size, and the causes for each fatality. Given that most fatal accidents involve multiple events, the current study coded up to a maximum of three causes for each fall fatality. After the Boolean algebra and minimal cut set analyses, accident causes associated with each falling site can be presented as a fault tree to provide an overview of the basic causes, which could trigger fall fatalities in the construction industry. Graphical icons were designed for each falling site along with the associated accident causes to illustrate the fault tree in a graphical manner. A graphical fault tree can improve inter-disciplinary discussion of risk management and the communication of accident causation to first line supervisors. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. Anthropometric protocols for the construction of new international fetal and newborn growth standards: the INTERGROWTH-21st Project.

    PubMed

    Cheikh Ismail, L; Knight, H E; Bhutta, Z; Chumlea, W C

    2013-09-01

    The primary aim of the INTERGROWTH-21(st) Project is to construct new, prescriptive standards describing optimal fetal and preterm postnatal growth. The anthropometric measurements include the head circumference, recumbent length and weight of the infants, and the stature and weight of the parents. In such a large, international, multicentre project, it is critical that all study sites follow standardised protocols to ensure maximal validity of the growth and nutrition indicators used. This paper describes, in detail, the selection of anthropometric personnel, equipment, and measurement and calibration protocols used to construct the new standards. Implementing these protocols at each study site ensures that the anthropometric data are of the highest quality to construct the international standards. © 2013 Royal College of Obstetricians and Gynaecologists.

  5. Definition of Availability Index of Deformed Building Constructions Using the Finite - Element Analysis Package

    NASA Astrophysics Data System (ADS)

    Shutova, M. N.; Skibin, G. M.; Evtushenko, S. I.

    2017-11-01

    The paper is devoted to the problem of definition of availability index of deforming building construction in atypical cases. The authors revealed a real applicability of the finite-elements analyses package, such as ANSYS, for engineering testing calculations of building constructions and determination of the sites of increased stresses. It was determined that stresses increased up to 7.75 times in the sites with mechanical defects (for steel crane girder); also, the authors revealed the convergence of the calculation results between the finite element method and a usual decision using the strength of materials (in the limits 2-14% for steel truss frame). The equivalent stresses don’t exceed the maximum permissible tension for this type of steel. The building constructions have a limited availability index.

  6. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  7. Risk compensation behaviours in construction workers' activities.

    PubMed

    Feng, Yingbin; Wu, Peng

    2015-01-01

    The purpose of this study was to test whether the construction workers have the tendency of engaging in risk compensation behaviours, and identify the demographic variables, which may influence the extent to which the construction workers may show risk compensation behaviours. Both quantitative (survey) and qualitative (interviews) approaches were used in this study. A questionnaire survey was conducted with all the construction workers on three building construction sites of a leading construction company in Australia. Semi-structured interviews were then conducted to validate the findings of the quantitative research. The findings indicate that workers tend to show risk compensation behaviours in the construction environment. The workers with more working experience, higher education, or having never been injured at work before have a higher tendency to show risk compensation in their activities than the others. The implication is that contractors need to assess the potential influence of workers' risk compensation behaviours when evaluating the effect of risk control measures. It is recommended that supervisors pay more attention to the behavioural changes of those workers who have more experience, higher education, and have never been injured before after the implementation of new safety control measures on construction site.

  8. High-density polyethylene pipe: A new material for pass-by passive integrated transponder antennas

    USGS Publications Warehouse

    Kazyak, David C.; Zydlewski, Joseph D.

    2012-01-01

    Pass-by passive integrated transponder (PIT) antennas are widely used to study the movements of fish in streams. At many sites, stream conditions make it difficult to maintain antennas and obtain a continuous record of movement. We constructed pass-by PIT antennas by using high-density polyethylene (HDPE) and found them to be robust to high flows and winter ice flows. Costs for HDPE antennas were similar to those of traditional polyvinyl chloride (PVC) antennas, although construction was somewhat more complicated. At sites where PVC antennas are frequently damaged, HDPE is a durable and economical alternative for PIT antenna construction.

  9. KSC-2012-6409

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers continue construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  10. KSC-2012-6406

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers continue construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  11. AASHTOWare Preconstruction Preliminary Investigation

    DOT National Transportation Integrated Search

    2017-12-17

    The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...

  12. Portable or Modular? There Is a Difference....

    ERIC Educational Resources Information Center

    Morton, Mike

    2002-01-01

    Describes differences between two types of school facilities: portable (prebuilt, temporary wood structure installed on site) and modular (method of construction for permanent buildings). Provides details of modular construction. (PKP)

  13. The Great Firewall of China: A Critical Analysis

    DTIC Science & Technology

    2008-06-01

    wall was constructed twenty five foot high, twenty foot wide and over 4,000 miles long when complete ( Asimov , 1998). The wall was constructed... Asimov , I (1998). Construction of the great wall. Retrieved May 20, 2008, from Great Wall Web site: http://www.ccds.charlotte.nc.us/History/China/save

  14. Gendered Communities of Practice and the Construction of Masculinities in Turkish Physical Education

    ERIC Educational Resources Information Center

    Atencio, Matthew; Koca, Canan

    2011-01-01

    This paper analyses the construction of masculinities in Turkish physical education through Carrie Paechter's conceptualisation of gendered communities of practice. According to Paechter, educational communities of practice operate as sites of gendered activity. Membership within these communities contributes to the construction of a gendered…

  15. Manual of Regulations and Recommendations for School Building Planning and Construction.

    ERIC Educational Resources Information Center

    Engelking, D. F.

    Recommendations and suggestions, as well as statutory provisions and state board regulations, are presented regarding school building construction in Idaho. The material is organized into the following sections--(1) school building planning, (2) the school site, (3) construction planning and requirements, (4) secondary school planning, (5)…

  16. 50 CFR 216.200 - Specified activity and specified geographical region.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under §§ 216.106 and 216.208 include, but may not be limited to, site construction, including ice road... ice road construction, and vessel and helicopter activity, but excluding seismic operations. (a)(1... TAKING AND IMPORTING OF MARINE MAMMALS Taking of Marine Mammals Incidental to Construction and Operation...

  17. A Principal's Guide to On-Site School Construction

    ERIC Educational Resources Information Center

    Brenner, William A.

    2009-01-01

    This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…

  18. 40 CFR 60.1110 - Who must submit a siting analysis?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... construction of a small municipal waste combustion unit after December 6, 2000. (b) If you commence construction on your municipal waste combustion unit after August 30, 1999, but before December 6, 2000, you...

  19. Conserving and Enhancing the Natural Environment: A Guide for Planning, Design, Construction, and Maintenance on New & Existing School Sites.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore. School Facilities Branch.

    Natural environments on school sites provide considerable multi-disciplinary educational opportunities, many of which are "hands-on" experiences that stimulate learning. This document presents guidelines on conserving and enhancing the natural environment on school sites. It provides guidance for developing the site requirements in…

  20. User costs as one of main advantages of precast concrete application in highway construction

    NASA Astrophysics Data System (ADS)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  1. Lessons Learned.

    ERIC Educational Resources Information Center

    Hassell, Kim Dale

    2000-01-01

    Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)

  2. Transport and Sources of Suspended Sediment in the Mill Creek Watershed, Johnson County, Northeast Kansas, 2006-07

    USGS Publications Warehouse

    Lee, Casey J.; Rasmussen, Patrick P.; Ziegler, Andrew C.; Fuller, Christopher C.

    2009-01-01

    The U.S. Geological Survey, in cooperation with the Johnson County Stormwater Management Program, evaluated suspended-sediment transport and sources in the urbanizing, 57.4 mi2 Mill Creek watershed from February 2006 through June 2007. Sediment transport and sources were assessed spatially by continuous monitoring of streamflow and turbidity as well as sampling of suspended sediment at nine sites in the watershed. Within Mill Creek subwatersheds (2.8-16.9 mi2), sediment loads at sites downstream from increased construction activity were substantially larger (per unit area) than those at sites downstream from mature urban areas or less-developed watersheds. Sediment transport downstream from construction sites primarily was limited by transport capacity (streamflow), whereas availability of sediment supplies primarily influenced transport downstream from mature urban areas. Downstream sampling sites typically had smaller sediment loads (per unit area) than headwater sites, likely because of sediment deposition in larger, less sloping stream channels. Among similarly sized storms, those with increased precipitation intensity transported more sediment at eight of the nine monitoring sites. Storms following periods of increased sediment loading transported less sediment at two of the nine monitoring sites. In addition to monitoring performed in the Mill Creek watershed, sediment loads were computed for the four other largest watersheds (48.6-65.7 mi2) in Johnson County (Blue River, Cedar, Indian, and Kill Creeks) during the study period. In contrast with results from smaller watersheds in Mill Creek, sediment load (per unit area) from the most urbanized watershed in Johnson County (Indian Creek) was more than double that of other large watersheds. Potential sources of this sediment include legacy sediment from earlier urban construction, accelerated stream-channel erosion, or erosion from specific construction sites, such as stream-channel disturbance during bridge renovation. The implication of this finding is that sediment yields from larger watersheds may remain elevated after the majority of urban development is complete. Surface soil, channel-bank, suspended-sediment, and streambed-sediment samples were analyzed for grain size, nutrients, trace elements, and radionuclides in the Mill Creek watershed to characterize suspended sediment between surface or channel-bank sources. Although concentrations and activities of cobalt, nitrogen, selenium, total organic carbon, cesium-137, and excess lead-210 had significant differences between surface and channel-bank samples, biases resulting from urban construction, additional sorption of constituents during sediment transport, and inability to accurately represent erosion from rills and gullies precluded accurate characterization of suspended-sediment source.

  3. Probabilistic Risk Analysis of Groundwater Related Problems in Subterranean Excavation Sites

    NASA Astrophysics Data System (ADS)

    Sanchez-Vila, X.; Jurado, A.; de Gaspari, F.; Vilarrasa, V.; Bolster, D.; Fernandez-Garcia, D.; Tartakovsky, D. M.

    2009-12-01

    Construction of subterranean excavations in densely populated areas is inherently hazardous. The number of construction sites (e.g., subway lines, railways and highway tunnels) has increased in recent years. These sites can pose risks to workers at the site as well as cause damage to surrounding buildings. The presence of groundwater makes the excavation even more complicated. We develop a probabilistic risk assessment (PRA) model o estimate the likelihood of occurrence of certain risks during a subway station construction. While PRA is widely used in many engineering fields, its applications to the underground constructions in general and to an underground station construction in particular are scarce if not nonexistent. This method enables us not only to evaluate the probability of failure, but also to quantify the uncertainty of the different events considered. The risk analysis was carried out using a fault tree analysis that made it possible to study a complex system in a structured and straightforward manner. As an example we consider an underground station for the new subway line in the Barcelona metropolitan area (Línia 9) through the town of Prat de Llobregat in the Llobregat River Delta, which is currently under development. A typical station on the L9 line lies partially between the shallow and the main aquifer. Specifically, it is located in the middle layer which is made up of silts and clays. By presenting this example we aim to illustrate PRA as an effective methodology for estimating and minimising risks and to demonstrate its utility as a potential tool for decision making.

  4. Event-based total suspended sediment particle size distribution model

    NASA Astrophysics Data System (ADS)

    Thompson, Jennifer; Sattar, Ahmed M. A.; Gharabaghi, Bahram; Warner, Richard C.

    2016-05-01

    One of the most challenging modelling tasks in hydrology is prediction of the total suspended sediment particle size distribution (TSS-PSD) in stormwater runoff generated from exposed soil surfaces at active construction sites and surface mining operations. The main objective of this study is to employ gene expression programming (GEP) and artificial neural networks (ANN) to develop a new model with the ability to more accurately predict the TSS-PSD by taking advantage of both event-specific and site-specific factors in the model. To compile the data for this study, laboratory scale experiments using rainfall simulators were conducted on fourteen different soils to obtain TSS-PSD. This data is supplemented with field data from three construction sites in Ontario over a period of two years to capture the effect of transport and deposition within the site. The combined data sets provide a wide range of key overlooked site-specific and storm event-specific factors. Both parent soil and TSS-PSD in runoff are quantified by fitting each to a lognormal distribution. Compared to existing regression models, the developed model more accurately predicted the TSS-PSD using a more comprehensive list of key model input parameters. Employment of the new model will increase the efficiency of deployment of required best management practices, designed based on TSS-PSD, to minimize potential adverse effects of construction site runoff on aquatic life in the receiving watercourses.

  5. Welcome to the Neighborhood.

    ERIC Educational Resources Information Center

    Schneider, Jay W.

    2001-01-01

    Discusses how community interest and involvement helps a new school reinvigorate an urban area. Community input into design and site selection, site improvements, interior elements, and construction management are addressed. (GR)

  6. Laboratory investigations

    NASA Astrophysics Data System (ADS)

    1984-09-01

    The primary objectives were to examine the site-specific physical, chemical, and biological factors that impact construction, durability and performance of the proposed 5-MW (sub e) solar pond system at the Salton Sea. The interactions of the water, salt, and soil of the site and on material compatibility were examined. Potential interactions of the water/brine and soil are particularly important because the pond will utilize the naturally occurring clays as a bottom seal. Although there is a considerable and growing solar pond literature, little written information deals with the important site-specific investigations of water, salt, and soil. Therefore, technical effort was directed toward identifying the factors that should be investigated and determining methods of investigation. As a result, a by-product was the development of an approach for site-specific investigations and some specific methodologies. This development should continue in order to establish a generic approach for evaluating the suitability of any site for the construction of large-scale solar ponds.

  7. Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

  8. Laboratory Investigations

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The primary objectives were to examine the site-specific physical, chemical, and biological factors that impact construction, durability and performance of the proposed 5-MW (sub e) solar pond system at the Salton Sea. The interactions of the water, salt, and soil of the site and on material compatibility were examined. Potential interactions of the water/brine and soil are particularly important because the pond will utilize the naturally occurring clays as a bottom seal. Although there is a considerable and growing solar pond literature, little written information deals with the important site-specific investigations of water, salt, and soil. Therefore, technical effort was directed toward identifying the factors that should be investigated and determining methods of investigation. As a result, a by-product was the development of an approach for site-specific investigations and some specific methodologies. This development should continue in order to establish a generic approach for evaluating the suitability of any site for the construction of large-scale solar ponds.

  9. Effects of highway construction on stream water quality and macroinvertebrate condition in a Mid-Atlantic Highlands watershed, USA

    USGS Publications Warehouse

    Chen, Y.; Viadero, R.C.; Wei, X.; Fortney, Ronald H.; Hedrick, Lara B.; Welsh, S.A.; Anderson, James T.; Lin, L.-S.

    2009-01-01

    Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997-2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region. Copyright ?? 2009 by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America. All rights reserved.

  10. 15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER CONSTRUCTION. THE VAULTS WERE USED TO STORE TRIGGERS AWAITING OFF-SITE SHIPMENT, OR RETURNED TRIGGERS AWAITING TO BE TRANSPORTED TO A BUILDING FOR RECOVERY OF THE PLUTONIUM. THE VAULT WALLS WERE CONSTRUCTED 14.5 FEET THICK. BUILDING 991, IN THE BACKGROUND, WAS THE FIRST OPERATIONAL BUILDING ON SITE (2/1/52). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  11. KSC-2012-6408

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a worker continues construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  12. Sequestering Lead in Paint by Utilizing Deconstructed Masonry Materials as Recycled Aggregate in Concrete. Revision 1

    DTIC Science & Technology

    2008-05-27

    into a new insoluble lead-phosphate mineral for on-site or off-site paint stripping; and 4. Encapsulation, where a liquid coating is applied over the...convert the LBP-contaminated masonry materials from hazardous wastes into new , environmentally friendly construction materials at minimum cost. 4...used to produce high strength concrete (Andrzej and Alina, 2002). The major concerns for use of recycled aggregates in new construction are now more

  13. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  14. The initial development of the WebMedQual scale: domain assessment of the construct of quality of health web sites.

    PubMed

    Provost, Mélanie; Koompalum, Dayin; Dong, Diane; Martin, Bradley C

    2006-01-01

    To develop a comprehensive instrument assessing quality of health-related web sites. Phase I consisted of a literature review to identify constructs thought to indicate web site quality and to identify items. During content analysis, duplicate items were eliminated and items that were not clear, meaningful, or measurable were reworded or removed. Some items were generated by the authors. Phase II: a panel consisting of six healthcare and MIS reviewers was convened to assess each item for its relevance and importance to the construct and to assess item clarity and measurement feasibility. Three hundred and eighty-four items were generated from 26 sources. The initial content analysis reduced the scale to 104 items. Four of the six expert reviewers responded; high concordance on the relevance, importance and measurement feasibility of each item was observed: 3 out of 4, or all raters agreed on 76-85% of items. Based on the panel ratings, 9 items were removed, 3 added, and 10 revised. The WebMedQual consists of 8 categories, 8 sub-categories, 95 items and 3 supplemental items to assess web site quality. The constructs are: content (19 items), authority of source (18 items), design (19 items), accessibility and availability (6 items), links (4 items), user support (9 items), confidentiality and privacy (17 items), e-commerce (6 items). The "WebMedQual" represents a first step toward a comprehensive and standard quality assessment of health web sites. This scale will allow relatively easy assessment of quality with possible numeric scoring.

  15. Constructs and methods for genome editing and genetic engineering of fungi and protists

    DOEpatents

    Hittinger, Christopher Todd; Alexander, William Gerald

    2018-01-30

    Provided herein are constructs for genome editing or genetic engineering in fungi or protists, methods of using the constructs and media for use in selecting cells. The construct include a polynucleotide encoding a thymidine kinase operably connected to a promoter, suitably a constitutive promoter; a polynucleotide encoding an endonuclease operably connected to an inducible promoter; and a recognition site for the endonuclease. The constructs may also include selectable markers for use in selecting recombinations.

  16. Superfund Record of Decision (EPA Region 5): Bofors Nobel Site, Muskegon, MI. (First remedial action), (amendment), July 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 85-acre Bofors Nobel site contains an active specialty chemical production plant in Egelston Township, Muskegon County, Michigan. Site features include an unused landfill. The ROD amends a 1990 ROD written by the state, which consisted of onsite incineration and onsite landfilling of lagoon area soil, construction of RCRA-type secure landfill cells to hold non-incinerated material and ash from the incinerated sludge. The selected amended remedial action for the site includes excavating and containing approximately 767,000 cubic yards of untreated sludge and soil in onsite RCRA-type secure landfill cells constructed as part of the original remedial action. The ROD Amendmentmore » does not address any issue associated with ground water treatment.« less

  17. Expanding the Planetary Analog Test Sites in Hawaii - Planetary Basalt Manipulation

    NASA Astrophysics Data System (ADS)

    Kelso, R.

    2013-12-01

    The Pacific International Space Center for Exploration Systems (PISCES) is one of the very few planetary surface research test sites in the country that is totally funded by the state legislature. In recent expansions, PISCES is broadening its work in planetary test sites to include much more R&D work in the planetary surface systems, and the manipulation of basalt materials. This is to include laser 3D printing of basalt, 'lunar-concrete' construction in state projects for Hawaii, renewable energy, and adding lava tubes/skylights to their mix of high-quality planetary analog test sites. PISCES Executive Director, Rob Kelso, will be providing program updates on the interest of the Hawaii State Legislature in planetary surface systems, new applied research initiatives in planetary basalts and interests in planetary construction.

  18. Construction site workers' malaria knowledge and treatment-seeking pattern in a highly endemic urban area of India.

    PubMed

    Shivalli, Siddharudha; Pai, Sudarshan; Akshaya, Kibballi Madhukeshwar; D'Souza, Neevan

    2016-03-16

    Construction sites are potential breeding places for some species of mosquitoes. Construction workers usually stay at the construction sites, thus being extremely susceptible to malaria. For malaria control, a special focus on them is warranted as they often seek treatment from unregulated, private vendors, increasing their risk of exposure to substandard drugs. To elicit the socio-demographic factors associated with comprehensive malaria knowledge (symptoms, mode of spread, and preventive measures) and treatment-seeking pattern (preferred source and type of treatment) among the construction workers in Mangaluru, India; and, to study the association among their comprehensive malaria knowledge, past suffering from malaria (within 1 year) and treatment-seeking pattern. A community based cross-sectional study was conducted in nine randomly selected construction sites of Mangaluru, a high-risk city for malaria with an annual parasite incidence of >2/1000/year, from June-September 2012. A sample size of 132 was estimated assuming at least 30% of them have satisfactory malaria knowledge, 10% absolute precision, 95% confidence level, design effect of 1.5 and 10% non-responses. A semi-structured interview schedule was used, and knowledge scores were computed. Multivariate linear (for knowledge score) and logistic regressions (for preferred source and type of treatment) were applied. One hundred and nineteen workers participated in the study (total approached-138). 85% (n = 101) of them were males. Mean knowledge score was 9.95 ± 3.19 (maximum possible score-16). The majority of them were aware of the symptoms and the mode of malaria transmission. However, <12% could explain the malaria preventive measures. Females workers (β = -0.281, p = 0.001), self stated malaria within 1 year (β = 0.276, p < 0.001) and who preferred allopathic treatment (β = 0.283, P = 0.001) displayed better knowledge scores. Male workers (AdjOR 7.21, 95% CI 2.3-22.9) and those with self stated malaria within 1 year (AdjOR 11.21, 95% CI 2.38-52.8) showed favorable treatment-seeking pattern. There is an urgent need of intensifying and streamlining of ongoing malaria prevention activities for construction site workers in Mangaluru, India. Emphasizing the gender equity at every stage of programme implementation and addressing their treatment-seeking pattern is essential. Involvement of labour employers and building contractors in this regard is imperative.

  19. 1. VIEW OF MECHANICAL ROOM CONSTRUCTED OF CONCRETE MASONRY UNITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF MECHANICAL ROOM CONSTRUCTED OF CONCRETE MASONRY UNITS AND A WOOD FRAME ENLISTED MEN BARRACKS. - Nike Hercules Missile Battery Summit Site, Battery Control Administration & Barracks Building, Anchorage, Anchorage, AK

  20. Graduate and Inservice Education. [SITE 2002 Section].

    ERIC Educational Resources Information Center

    Crawford, Caroline M., Ed.

    This document contains the papers on graduate and inservice education from the SITE (Society for Information Technology & Teacher Education) 2002 conference. Topics covered include: Geographic Information Systems in teacher education; re-certification and accreditation; construction of a Web site by graduate teacher education students; Web-based…

  1. Construction of hexahedral finite element mesh capturing realistic geometries of a petroleum reserve

    DOE PAGES

    Park, Byoung Yoon; Roberts, Barry L.; Sobolik, Steven R.

    2017-07-27

    The three-dimensional finite element mesh capturing realistic geometries of the Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh consists of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time while maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for various civil and geological structures.« less

  2. Construction of hexahedral finite element mesh capturing realistic geometries of a petroleum reserve

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Byoung Yoon; Roberts, Barry L.; Sobolik, Steven R.

    The three-dimensional finite element mesh capturing realistic geometries of the Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh consists of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time while maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for various civil and geological structures.« less

  3. The status of LILW disposal facility construction in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan

    2013-07-01

    In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less

  4. Some Internet Applications for Language Teaching: A Web-Assisted Course of English for Construction.

    ERIC Educational Resources Information Center

    Fernandez, Jose Maria Perez

    2001-01-01

    Describes how the Internet was used in an English class for architecture and construction students at the University of Granada (Spain). Discusses course organization; links to construction company Web sites; active learning; group work; student presentations; student autonomy and student motivation; and problems with plagiarism. (LRW)

  5. 70. Photocopied August 1978. BIRDSEYE VIEW OF COMPENSATING GATES CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    70. Photocopied August 1978. BIRDSEYE VIEW OF COMPENSATING GATES CONSTRUCTION SITE FROM THE CANADIAN CANAL, SEPTEMBER 24, 1901. THE VIEW SHOWS THE INTERNATIONAL RAILROAD BRIDGE AND THE BEGININGS OF BREAKWATER CONSTRUCTION FOR THE FIRST FOUR COMPENSATING GATES. (309) - Michigan Lake Superior Power Company, Portage Street, Sault Ste. Marie, Chippewa County, MI

  6. Specifications for Supplementary Classroom Units "Standard Construction" and "Preframed Construction".

    ERIC Educational Resources Information Center

    Waring, Robert B.; And Others

    The standards that should be applied to the construction of supplementary classroom units are discussed in this report. Areas dealt with are--(1) general mechanical and electrical work, (2) concrete, (3) masonry, (4) miscellaneous steel and iron, (5) metal windows, (6) carpentry at site, (7) millwork, (8) acoustic treatment, (9) thermal…

  7. Construction Site Environmental Impact in Civil Engineering Education

    ERIC Educational Resources Information Center

    Teixeira, Jose M. Cardoso

    2005-01-01

    The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…

  8. Evaluation of the Mandatory Construction Induction Training Program in Western Australia: Unanticipated Consequences

    ERIC Educational Resources Information Center

    Bahn, Susanne; Barratt-Pugh, Llandis

    2012-01-01

    Since January 1, 2007, Government legislation in Western Australia required all workers in construction to complete mandatory safety awareness training before they began work on site. During the implementation of this new legislation there was considerable resistance from the construction sector due to the mandatory nature of the training. The…

  9. Unmanned aerial vehicles in construction and worker safety.

    PubMed

    Howard, John; Murashov, Vladimir; Branche, Christine M

    2018-01-01

    Applications of unmanned aerial vehicles (UAVs) for military, recreational, public, and commercial uses have expanded significantly in recent years. In the construction industry, UAVs are used primarily for monitoring of construction workflow and job site logistics, inspecting construction sites to assess structural integrity, and for maintenance assessments. As is the case with other emerging technologies, occupational safety assessments of UAVs lag behind technological advancements. UAVs may create new workplace hazards that need to be evaluated and managed to ensure their safe operation around human workers. At the same time, UAVs can perform dangerous tasks, thereby improving workplace safety. This paper describes the four major uses of UAVs, including their use in construction, the potential risks of their use to workers, approaches for risk mitigation, and the important role that safety and health professionals can play in ensuring safe approaches to the their use in the workplace. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  10. Construction of a directed hammerhead ribozyme library: towards the identification of optimal target sites for antisense-mediated gene inhibition.

    PubMed Central

    Pierce, M L; Ruffner, D E

    1998-01-01

    Antisense-mediated gene inhibition uses short complementary DNA or RNA oligonucleotides to block expression of any mRNA of interest. A key parameter in the success or failure of an antisense therapy is the identification of a suitable target site on the chosen mRNA. Ultimately, the accessibility of the target to the antisense agent determines target suitability. Since accessibility is a function of many complex factors, it is currently beyond our ability to predict. Consequently, identification of the most effective target(s) requires examination of every site. Towards this goal, we describe a method to construct directed ribozyme libraries against any chosen mRNA. The library contains nearly equal amounts of ribozymes targeting every site on the chosen transcript and the library only contains ribozymes capable of binding to that transcript. Expression of the ribozyme library in cultured cells should allow identification of optimal target sites under natural conditions, subject to the complexities of a fully functional cell. Optimal target sites identified in this manner should be the most effective sites for therapeutic intervention. PMID:9801305

  11. 10 CFR 100.2 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Scope. 100.2 Section 100.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.2 Scope. The siting requirements contained in this part apply to applications for site approval for the purpose of constructing and operating stationary power...

  12. Wing Infrastructure and Development Outlook (WINDO) Final Environmental Assessment

    DTIC Science & Technology

    2006-06-01

    installation, and repair F Construct revetment , paint taxi lines, install runway shoulders, extend/repair flight line, maintain airfield pavement...RKMF990065 CONSTRUCT CHAPEL MEETING FAC C RKMF000041 CONSTRUCT REVETMENT LOLA SUPPORT FAC F RKMF010042 CONSTRUCT SHOULDERS RUNWAY 03L/21R F RKMF030054...100-foot transect intervals. Sampling utilized 100- foot intervals in blocks . Isolate artifacts were recorded on site forms until 1996. They were

  13. Transplantation of Tissue-Engineered Cartilage in an Animal Model (Xenograft and Autograft): Construct Validation.

    PubMed

    Nemoto, Hitoshi; Watson, Deborah; Masuda, Koichi

    2015-01-01

    Tissue engineering holds great promise for cartilage repair with minimal donor-site morbidity. The in vivo maturation of a tissue-engineered construct can be tested in the subcutaneous tissues of the same species for autografts or of immunocompromised animals for allografts or xenografts. This section describes detailed protocols for the surgical transplantation of a tissue-engineered construct into an animal model to assess construct validity.

  14. Heavy construction equipment noise study using dosimetry and time-motion studies

    NASA Astrophysics Data System (ADS)

    Spencer, Ellsworth R.; Yantek, David S.

    2005-09-01

    Noise-induced hearing loss continues to afflict workers in many occupational settings despite longstanding recognition of the problems and well-known methods of prevention and regulations. Sound levels associated with heavy construction equipment range from 80 to 120 dB(A) and power tools commonly used in construction produce sound levels up to 115 dB(A). The focus of the research was to determine the noise exposures of heavy construction equipment operators while documenting the workers' tasks, (i.e., hauling, moving, and/or pushing construction material). Time-motion studies were performed at the construction sites and were used to correlate the noise dosage with the work performed by equipment operators. The cumulative dose for the operator was then plotted with references to work tasks, to identify the tasks that caused the greatest noise exposure. Three construction sites were examined and located in the western Pennsylvania and eastern Ohio areas. The types of construction equipment studied included asphalt pavers, backhoes, bulldozers, compaction equipment, excavators, haul trucks, telehandlers, and wheeled loaders. The results showed that bulldozer operators consistently had the highest noise exposures, ranging from a NIOSH REL (Recommended Exposure Limit) dose of 844% to 25836% and an OSHA PEL (Permissible Exposure Limit) dose of 139% to 1397%.

  15. 10 CFR 60.61 - Provision of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...

  16. Fertilizer effects on attaining vegetation requirements.

    DOT National Transportation Integrated Search

    2014-02-01

    This project was developed to evaluate the effects of varying the substrate and fertilization regimes on the success of complex warm-season grass and forb seedings on recent roadside construction sites. Re-vegetating construction projects is required...

  17. AERIAL - MSC SITE - CONSTRUCTION PROGRESS - MSC

    NASA Image and Video Library

    1963-12-24

    S63-23656 (1963) --- Aerial view of construction progress at the Manned Spacecraft Center, Houston, Texas. NOTE: The Manned Spacecraft Center was named Lyndon B. Johnson Space Center in memory of the late President following his death.

  18. Summary of the US Army Corps of Engineers/US Environmental Protection Agency Field Verification Program

    DTIC Science & Technology

    1988-10-01

    sites tend to be colonized by aquatic organisms adapted to an intertidal existence and by typical wetland plants. These plants may or may not be the...the upland site and within the intertidal range for the wetland site. Site Selection and Design Site selection 15. Acceptable sites for upland and... intertidal range. Along one side of the site, a sandbag dike was constructed that could be removed after filling to provide easy tidal interchange

  19. Postural stability effects of random vibration at the feet of construction workers in simulated elevation.

    PubMed

    Simeonov, P; Hsiao, H; Powers, J; Ammons, D; Kau, T; Amendola, A

    2011-07-01

    The risk of falls from height on a construction site increases under conditions which degrade workers' postural control. At elevation, workers depend heavily on sensory information from their feet to maintain balance. The study tested two hypotheses: "sensory enhancement"--sub-sensory (undetectable) random mechanical vibrations at the plantar surface of the feet can improve worker's balance at elevation; and "sensory suppression"--supra-sensory (detectable) random mechanical vibrations can have a degrading effect on balance in the same experimental settings. Six young (age 20-35) and six aging (age 45-60) construction workers were tested while standing in standard and semi-tandem postures on instrumented gel insoles. The insoles applied sub- or supra-sensory levels of random mechanical vibrations to the feet. The tests were conducted in a surround-screen virtual reality system, which simulated a narrow plank at elevation on a construction site. Upper body kinematics was assessed with a motion-measurement system. Postural stability effects were evaluated by conventional and statistical mechanics sway measures, as well as trunk angular displacement parameters. Analysis of variance did not confirm the "sensory enhancement" hypothesis, but provided evidence for the "sensory suppression" hypothesis. The supra-sensory vibration had a destabilizing effect, which was considerably stronger in the semi-tandem posture and affected most of the sway variables. Sensory suppression associated with elevated vibration levels on a construction site may increase the danger of losing balance. Construction workers at elevation, e.g., on a beam or narrow plank might be at increased risk of fall if they can detect vibrations under their feet. To reduce the possibility of losing balance, mechanical vibration to supporting structures used as walking/working surfaces should be minimized when performing construction tasks at elevation. Published by Elsevier Ltd.

  20. Production patterns of packaging waste categories generated at typical Mediterranean residential building worksites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    González Pericot, N., E-mail: natalia.gpericot@upm.es; Villoria Sáez, P., E-mail: paola.villoria@upm.es; Del Río Merino, M., E-mail: mercedes.delrio@upm.es

    2014-11-15

    Highlights: • On-site segregation level: 1.80%; training and motivation strategies were not effective. • 70% Cardboard waste: from switches and sockets during the building services stage. • 40% Plastic waste: generated during structures and partition works due to palletizing. • >50% Wood packaging waste, basically pallets, generated during the envelope works. - Abstract: The construction sector is responsible for around 28% of the total waste volume generated in Europe, which exceeds the amount of household waste. This has led to an increase of different research studies focusing on construction waste quantification. However, within the research studies made, packaging waste hasmore » been analyzed to a limited extent. This article focuses on the packaging waste stream generated in the construction sector. To this purpose current on-site waste packaging management has been assessed by monitoring ten Mediterranean residential building works. The findings of the experimental data collection revealed that the incentive measures implemented by the construction company to improve on-site waste sorting failed to achieve the intended purpose, showing low segregation ratios. Subsequently, through an analytical study the generation patterns for packaging waste are established, leading to the identification of the prevailing kinds of packaging and the products responsible for their generation. Results indicate that plastic waste generation maintains a constant trend throughout the whole construction process, while cardboard becomes predominant towards the end of the construction works with switches and sockets from the electricity stage. Understanding the production patterns of packaging waste will be beneficial for adapting waste management strategies to the identified patterns for the specific nature of packaging waste within the context of construction worksites.« less

  1. Frequency and quality of radiation monitoring of construction workers at two gaseous diffusion plants.

    PubMed

    Bingham, Eula; Ringen, Knut; Dement, John; Cameron, Wilfrid; McGowan, William; Welch, Laura; Quinn, Patricia

    2006-09-01

    Construction workers were and are considered temporary workers at many construction sites. Since World War II, large numbers of construction workers were employed at U.S. Department of Energy nuclear weapons sites for periods ranging from a few days to over 30 years. These workers performed tasks during new construction and maintenance, repair, renovation, and demolition of existing facilities. Such tasks may involve emergency situations, and may entail opportunities for significant radiation exposures. This paper provides data from interviews with more than 750 construction workers at two gaseous diffusion plants (GDPs) at Paducah, Kentucky, and Portsmouth, Ohio regarding radiation monitoring practices. The aim was to determine the extent to which workers believed they were monitored during tasks involving potential radiation exposures. The adequacy of monitoring practices is important for two reasons: (a) Protecting workers from exposures: Construction workers were employed by sub-contractors, and may frequently been excluded from safety and health programs provided to permanent employees; and (b) Supporting claims for compensation: The Energy Employees Occupational Illness Compensation Program Act (EEOICPA) requires dose reconstruction of radiation exposures for most workers who file a claim regarding cancer. The use of monitoring data for radiation to qualify a worker means that there should be valid and complete monitoring during the work time at the various nuclear plants or workers may be unfairly denied compensation. The worker interviews from Paducah and Portsmouth were considered especially useful because these sites were designated as Special Exposure Cohorts (SECs) and the workers did not have to have a dose reconstruction to qualify for compensation for most cancers. Therefore, their responses were less likely to be affected by compensation concerns. Interview questions included asking for information regarding whether monitoring was performed, how often, and the maintenance (calibration) of monitoring equipment (devices).

  2. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    NASA Astrophysics Data System (ADS)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  3. A-3 Cleared Site

    NASA Image and Video Library

    2007-06-18

    Work to clear the site for the A-3 Test Stand progresses quickly, as seen in this photo taken June 18 from atop the A-1 Test Stand. The next step in construction at 19-acre site will be the arrival of fill dirt in mid-July, followed by pilings and piling caps.

  4. 47 CFR 27.1170 - Payment Issues.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Microwave Relocation from the 2110-2150 Mhz and 2160-2200 Mhz Bands § 27.1170 Payment Issues. Prior to initiating operations for a newly constructed site or modified existing site, an AWS entity or MSS/ATC entity is required to file a notice containing site-specific data with the clearinghouse. The notice...

  5. 47 CFR 27.1170 - Payment Issues.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... initiating operations for a newly constructed site or modified existing site, an AWS entity or MSS/ATC entity... prior coordination notice (PCN) under § 101.103(d) of this chapter is prepared, AWS entities can satisfy the site-data filing requirement by submitting a copy of their PCN to the clearinghouse. AWS entities...

  6. Hazardous Waste Cleanup: USDOE Knolls Atomic Power Laboratory in Niskayuna, New York

    EPA Pesticide Factsheets

    The Knolls site is located at 2401 River Road in the Town of Niskayuna, Schenectady County, New York, on the south bank of the Mohawk River. Construction of the site began in 1948 and laboratory operations began in 1949. The site consists of 170 acres of

  7. A-3 Cleared Site

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work to clear the site for the A-3 Test Stand progresses quickly, as seen in this photo taken June 18 from atop the A-1 Test Stand. The next step in construction at 19-acre site will be the arrival of fill dirt in mid-July, followed by pilings and piling caps.

  8. 75 FR 12581 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ...; Commencement of Construction Requirements; AREVA Enrichment Services, Eagle Rock Enrichment Facility..., Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S... the site. Site grading and erosion control. Excavating the site including rock blasting and removal...

  9. 34 CFR 75.603 - Grantee's title to site.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Grantee's title to site. 75.603 Section 75.603... by a Grantee? Construction § 75.603 Grantee's title to site. A grantee must have or obtain a full..., whichever is longer. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  10. Cryptic splice site in the complementary DNA of glucocerebrosidase causes inefficient expression.

    PubMed

    Bukovac, Scott W; Bagshaw, Richard D; Rigat, Brigitte A; Callahan, John W; Clarke, Joe T R; Mahuran, Don J

    2008-10-15

    The low levels of human lysosomal glucocerebrosidase activity expressed in transiently transfected Chinese hamster ovary (CHO) cells were investigated. Reverse transcription PCR (RT-PCR) demonstrated that a significant portion of the transcribed RNA was misspliced owing to the presence of a cryptic splice site in the complementary DNA (cDNA). Missplicing results in the deletion of 179 bp of coding sequence and a premature stop codon. A repaired cDNA was constructed abolishing the splice site without changing the amino acid sequence. The level of glucocerebrosidase expression was increased sixfold. These data demonstrate that for maximum expression of any cDNA construct, the transcription products should be examined.

  11. Horizontal directional drilling: a green and sustainable technology for site remediation.

    PubMed

    Lubrecht, Michael D

    2012-03-06

    Sustainability has become an important factor in the selection of remedies to clean up contaminated sites. Horizontal directional drilling (HDD) is a relatively new drilling technology that has been successfully adapted to site remediation. In addition to the benefits that HDD provides for the logistics of site cleanup, it also delivers sustainability advantages, compared to alternative construction methods.

  12. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  13. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  14. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  15. 20 CFR 672.525 - How are the costs associated with real property treated in the YouthBuild program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...); (2) On-site trainee supervisors; (3) Construction management; (4) Relocation of buildings; and (5... families or low-income families or for use as transitional housing. (2) Construction of buildings for use...) Construction or rehabilitation of community or other public facilities, except, as provided in § 672.510(b...

  16. Anakuran: A Proposed Path to Education for Children of Migrant Construction Workers in India

    ERIC Educational Resources Information Center

    Pal, Satarupa Dutta

    2014-01-01

    "If you cannot go to school, the school comes to you." Project Anakuran (the Hindi word for germination) is an innovative design which seeks to provide formal education through Information and Communication Technology (ICT) to the children of migrant construction labourers based at medium and large construction sites in urban locales.…

  17. 76 FR 10390 - Notice of Lodging of Proposed Consent Decree Pursuant to the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... claims of the United States against Eastwood Construction, LLC and Eastwood Homes, Inc. (collectively... United States v. Eastwood Construction, LLC, et. al, Civil Action No. 3:11-cv-83, was lodged with the... reduce the threat of discharges of storm water from its residential construction sites. The Eastwood...

  18. Pressuremeter correlation study.

    DOT National Transportation Integrated Search

    1968-10-01

    The determination of in-situ strengths at construction sites has long been a problem that has caused considerable difficulty for Construction Engineers. A variety of tests have been developed over a period of time to attempt to obtain an estimate of ...

  19. 40 CFR 35.935-3 - Property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction), and must thereafter retain, a fee simple or such estate or interest in the site of a step 3... municipalities have, or will have before the initiation of step 3 construction, such interests or rights in land...

  20. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  1. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  2. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  3. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  4. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  5. Investigation and identification of factors affecting migrating peasant workers' usage of safety footwear in the Chinese construction industry.

    PubMed

    Suo, Qinghui; Zhang, Daming

    2017-09-01

    A sample of 300 migrating peasant workers from 15 Chinese building construction sites completed a demographic questionnaire to investigate the usage of safety footwear. The survey form was constructed based on the theory of planned behaviour, and a total of 12 questions focusing on the workers' past experience, attitudes, subjective norms and perceived behavioural control were included in the survey. It was found that 92% of the participants did not wear safety footwear while working on construction sites, although more than 91% of them believed that safety footwear would protect the foot from injury; none of the participants had been provided free safety footwear by their employer. Regression analysis shows that employers' attitude is the most important factor affecting their usage of safety footwear, 'providing free safety footwear' and 'comfortability of the safety footwear' ranking second and third respectively.

  6. Virtually Out of This World!

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.

  7. Workers' safety in the construction industry in the southern West Bank of Palestine.

    PubMed

    Al-Sari, M I; Al-Khatib, I A

    2012-10-01

    There are few data about safety in the construction industry in Palestine. The main aim of the study was to assess worker's experiences and perceptions of safety at construction sites in Hebron and Bethlehem governorates of the West Bank. A structured questionnaire was completed through direct interviews with 349 construction workers. Of the respondents, 34.6% had experienced work-related accidents, 13.0% and 65.6% indicated that their workplace did not have a first-aid kit or trained first-aid specialist respectively, 35.8% reported that their work sites did not have safety tools and 83.7% had not received safety training. Workers perceived that awareness and training were the most frequent factor affecting workers' safety, with the foreman position having the greatest impact on the workers' safety. Greater enforcement of the current Palestinian safety laws is needed.

  8. Modeling job sites in real time to improve safety during equipment operation

    NASA Astrophysics Data System (ADS)

    Caldas, Carlos H.; Haas, Carl T.; Liapi, Katherine A.; Teizer, Jochen

    2006-03-01

    Real-time three-dimensional (3D) modeling of work zones has received an increasing interest to perform equipment operation faster, safer and more precisely. In addition, hazardous job site environment like they exist on construction sites ask for new devices which can rapidly and actively model static and dynamic objects. Flash LADAR (Laser Detection and Ranging) cameras are one of the recent technology developments which allow rapid spatial data acquisition of scenes. Algorithms that can process and interpret the output of such enabling technologies into threedimensional models have the potential to significantly improve work processes. One particular important application is modeling the location and path of objects in the trajectory of heavy construction equipment navigation. Detecting and mapping people, materials and equipment into a three-dimensional computer model allows analyzing the location, path, and can limit or restrict access to hazardous areas. This paper presents experiments and results of a real-time three-dimensional modeling technique to detect static and moving objects within the field of view of a high-frame update rate laser range scanning device. Applications related to heavy equipment operations on transportation and construction job sites are specified.

  9. Injury surveillance in construction: what is an "injury", anyway?

    PubMed

    Welch, Laura S; Hunting, Katherine

    2003-08-01

    Over the last decade, there has been a decline in injuries with days away from work in construction, associated with an increase in injuries with restricted work activity only. We abstracted demographics, diagnosis, cause-of-injury, and hospital discharge information for 481 workers from one large construction project treated in an urban Emergency Department (ED). The project safety team provided data on all injuries from this site, including first aid cases. This site had fewer injuries with days away from work than expected from national rates. Two hundred and fifty-six injuries were reported on the OSHA log, and of those 93 entailed days away from work; 1,515 injuries were considered first aid/medical only. We used a sample of the data to estimate that the site classified as "recordable" 128 of the 481 ED-treated injuries from this site (27%). The pattern of injury varies depending on the subset of injuries examined. Lost time injuries, as reported in BLS data, record fewer lacerations and eye injuries, and more strains and sprains. No one surveillance system presents the full spectrum of occupational injury. Tracking all injuries allow early recognition of injury risks, and therefore can lead to more effective prevention. Copyright 2003 Wiley-Liss, Inc.

  10. Event-based design tool for construction site erosion and sediment controls

    NASA Astrophysics Data System (ADS)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-09-01

    This paper provides additional discussion surrounding the novel event-based soil loss models developed by Trenouth and Gharabaghi (2015) for the design of erosion and sediment controls (ESCs) for various phases of construction - from pre-development to post-development conditions. The datasets for the study were obtained from three Ontario sites - Greensborough, Cookstown, and Alcona - in addition to datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. Model performances were evaluated for each of the study sites, and quantified using commonly-reported statistics. This work is nested within a broader conceptual framework, which includes the estimation of ambient receiving water quality, the prediction of event mean runoff quality for a given design storm, and the calculation of the required level of protection using adequate ESCs to meet receiving water quality guidelines. These models allow design engineers and regulatory agencies to assess the potential risk of ecological damage to receiving waters due to inadequate soil erosion and sediment control practices using dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction, typically for a 2- or 5-year design storm return period.

  11. DEVELOPMENT OF A SAFETY COMMUNICATION AND RECOGNITION PROGRAM FOR CONSTRUCTION

    PubMed Central

    SPARER, EMILY H.; HERRICK, ROBERT F.; DENNERLEIN, JACK T.

    2017-01-01

    Leading-indicator–based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator–based (e.g., injury rates) programs. We designed a leading-indicator–based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite, and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. PMID:25815741

  12. c-Myb Binds to a Sequence in the Proximal Region of the RAG-2 Promoter and Is Essential for Promoter Activity in T-Lineage Cells

    PubMed Central

    Wang, Qian-Fei; Lauring, Josh; Schlissel, Mark S.

    2000-01-01

    The RAG-2 gene encodes a component of the V(D)J recombinase which is essential for the assembly of antigen receptor genes in B and T lymphocytes. Previously, we reported that the transcription factor BSAP (PAX-5) regulates the murine RAG-2 promoter in B-cell lines. A partially overlapping but distinct region of the proximal RAG-2 promoter was also identified as an important element for promoter activity in T cells; however, the responsible factor was unknown. In this report, we present data demonstrating that c-Myb binds to a Myb consensus site within the proximal promoter and is critical for its activity in T-lineage cells. We show that c-Myb can transactivate a RAG-2 promoter-reporter construct in cotransfection assays and that this transactivation depends on the proximal promoter Myb consensus site. By using a chromatin immunoprecipitation (ChIP) strategy, fractionation of chromatin with anti-c-Myb antibody specifically enriched endogenous RAG-2 promoter DNA sequences. DNase I genomic footprinting revealed that the c-Myb site is occupied in a tissue-specific fashion in vivo. Furthermore, an integrated RAG-2 promoter construct with mutations at the c-Myb site was not enriched in the ChIP assay, while a wild-type integrated promoter construct was enriched. Finally, this lack of binding of c-Myb to a chromosomally integrated mutant RAG-2 promoter construct in vivo was associated with a striking decrease in promoter activity. We conclude that c-Myb regulates the RAG-2 promoter in T cells by binding to this consensus c-Myb binding site. PMID:11094072

  13. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  14. Re-constructing historical Adélie penguin abundance estimates by retrospectively accounting for detection bias.

    PubMed

    Southwell, Colin; Emmerson, Louise; Newbery, Kym; McKinlay, John; Kerry, Knowles; Woehler, Eric; Ensor, Paul

    2015-01-01

    Seabirds and other land-breeding marine predators are considered to be useful and practical indicators of the state of marine ecosystems because of their dependence on marine prey and the accessibility of their populations at breeding colonies. Historical counts of breeding populations of these higher-order marine predators are one of few data sources available for inferring past change in marine ecosystems. However, historical abundance estimates derived from these population counts may be subject to unrecognised bias and uncertainty because of variable attendance of birds at breeding colonies and variable timing of past population surveys. We retrospectively accounted for detection bias in historical abundance estimates of the colonial, land-breeding Adélie penguin through an analysis of 222 historical abundance estimates from 81 breeding sites in east Antarctica. The published abundance estimates were de-constructed to retrieve the raw count data and then re-constructed by applying contemporary adjustment factors obtained from remotely operating time-lapse cameras. The re-construction process incorporated spatial and temporal variation in phenology and attendance by using data from cameras deployed at multiple sites over multiple years and propagating this uncertainty through to the final revised abundance estimates. Our re-constructed abundance estimates were consistently higher and more uncertain than published estimates. The re-constructed estimates alter the conclusions reached for some sites in east Antarctica in recent assessments of long-term Adélie penguin population change. Our approach is applicable to abundance data for a wide range of colonial, land-breeding marine species including other penguin species, flying seabirds and marine mammals.

  15. Consequences of least tern (Sternula antillarum) microhabitat nest-site selection on natural and mechanically constructed sandbars in the Missouri River

    USGS Publications Warehouse

    Stucker, Jennifer H.; Buhl, Deborah A.; Sherfy, Mark H.

    2013-01-01

    Nest-habitat selection in colonial species has rarely been assessed at multiple spatial scales to evaluate its fitness consequences. Management for the federally endangered U.S. Interior population of Least Terns (Sternula antillarum) has focused on maintenance of breeding habitats, including mechanical construction of sandbars from dredged material. Least Terns are attracted to large areas of unvegetated substrate, yet small-scale habitat features are thought to trigger selection for nesting. We evaluated nest-scale habitat selection to determine (1) whether selection differs between constructed and natural sandbars and (2) the subsequent consequences of habitat selection on nest success. During 2006–2008, we examined 869 Least Tern nest sites on constructed and natural sandbars in the Missouri River for evidence of microhabitat selection at the nest in relation to habitat within the surrounding 3-m area. Least Tern nest sites had coarser and larger substrate materials at the nest, more debris, and less vegetation than the surrounding area. Nests in constructed habitats had a greater percentage of coarse substrates and less vegetation or debris than nests in naturally created habitats. Apparent nest success was 1.8× greater on constructed than on natural sandbars. Nest success was best predicted by models with two spatial scales of predictors, including substrates (nest) and vegetation and debris (nest or surrounding area). Our results indicate that Least Terns select nest microhabitat characteristics that are associated with wind- and water-scoured habitats, and that nest success increases when these habitats are selected.

  16. Middle Stone Age bedding construction and settlement patterns at Sibudu, South Africa.

    PubMed

    Wadley, Lyn; Sievers, Christine; Bamford, Marion; Goldberg, Paul; Berna, Francesco; Miller, Christopher

    2011-12-09

    The Middle Stone Age (MSA) is associated with early behavioral innovations, expansions of modern humans within and out of Africa, and occasional population bottlenecks. Several innovations in the MSA are seen in an archaeological sequence in the rock shelter Sibudu (South Africa). At ~77,000 years ago, people constructed plant bedding from sedges and other monocotyledons topped with aromatic leaves containing insecticidal and larvicidal chemicals. Beginning at ~73,000 years ago, bedding was burned, presumably for site maintenance. By ~58,000 years ago, bedding construction, burning, and other forms of site use and maintenance intensified, suggesting that settlement strategies changed. Behavioral differences between ~77,000 and 58,000 years ago may coincide with population fluctuations in Africa.

  17. A Proposed Collaborative Framework for Prefabricated Housing Construction Using RFID Technology

    NASA Astrophysics Data System (ADS)

    Charnwasununth, Phatsaphan; Yabuki, Nobuyoshi; Tongthong, Tanit

    Despite the popularity of prefabricated housing construction in Thailand and many other countries, due to the lack of collaboration in current practice, undesired low productivity and a number of mistakes are identified. This research proposes a framework to raise the collaborative level for improving productivity and reducing mistake occurrences at sites. In this framework, RFID system bridges the gap between the real situation and the design, and the proposed system can cope with the unexpected construction conditions by generating proper alternatives. This system is composed of PDAs, RFID readers, laptop PCs, and a desktop PC. Six main modules and a database system are implemented in laptop PCs for recording actual site conditions, generating working alternatives, providing related information, and evaluating the work.

  18. Field evaluation of hydromulches for water quality and vegetation establishment.

    DOT National Transportation Integrated Search

    2013-03-01

    Soil erosion and sediment pollution can be major problems in and around construction sites due to land disturbing activities that leave areas of : unprotected soil during active construction. Establishing vegetation to control erosion can be difficul...

  19. Teaching Abroad: Algeria.

    ERIC Educational Resources Information Center

    Agriopoulos, Michel

    1981-01-01

    Describes a program in Algeria which included the construction of a training facility to ease the shortage of semiskilled workers, particularly construction site electricians and instrument installers. Priorities were to define training needs, implement the program, and produce graduates as soon as possible. (JOW)

  20. Analysis of the state of the art of precast concrete bridge substructure systems.

    DOT National Transportation Integrated Search

    2013-10-01

    Precasting of bridge substructure components holds potential for accelerating the construction of bridges,reducing : impacts to the traveling public on routes adjacent to construction sites, improving bridge durability and hence service : life, and r...

  1. Hydrologic budget for a wetland system.

    DOT National Transportation Integrated Search

    1998-07-01

    An important functional indicator of the success of a constructed wetland as a replacement for a natural system is the hydrology of : a site and whether it is adequate to support wetland vegetation and habitats. For constructed wetlands with potentia...

  2. Evaluation of hot in-place recycle.

    DOT National Transportation Integrated Search

    2010-06-01

    This report documents the construction of hot in-place recycled (HIPR) pavement on SR 542. : HIPR is a process by which rehabilitation of the existing HMA pavement occurs on site in one : operation. HIPR project selection, mix design, construction an...

  3. PARTICULATE EMISSION MEASUREMENTS FROM CONTROLLED CONSTRUCTION ACTIVITIES

    EPA Science Inventory

    The report summarized the results of field testing of the effectiveness of control measures for sources of fugitive particulate emissions found at construction sites. The effectiveness of watering temporary, unpaved travel surfaces on emissions of particulate matter with aerodyna...

  4. 40 CFR 60.1140 - Where and when must I hold a public meeting on the siting analysis?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... will construct your municipal waste combustion unit. (c) You must schedule the public meeting to occur...

  5. Canadian Innovations in Siting Hazardous Waste Management Facilities

    PubMed

    Kuhn; Ballard

    1998-07-01

    / Siting hazardous waste facilities is an extremely complex and difficult endeavor. Public aversion to the construction of these facilities in or near their community often results in concerted opposition, referred to as the NIMBY syndrome. For the most part, siting processes do not fail because of inadequate environmental or technical considerations, but because of the adversarial decision-making strategies employed by the proponents. Innovative siting processes used in the provinces of Alberta and Manitoba offer tangible evidence of the successful application of an innovative siting approach based on the principles of decentralization of decision-making authority and full and meaningful public involvement. The purpose of this paper is to evaluate four Canadian siting processes from the perspective of public participation and access to decision-making authority. Examples of siting processes related to hazardous waste management facilities are provided from the provinces of Alberta, Manitoba, British Columbia, and Ontario. Siting has evolved from approaches dominated by top-down decision making to increasing decentralized and pluralistic approaches. Focusing on social and political concerns of potentially affected communities and on the process of decision making itself are fundamental to achieving siting success. In Alberta initially, and later in Manitoba, this new "open approach" to siting has resulted in the construction of the first two comprehensive hazardous waste treatment facilities in Canada.KEY WORDS: Hazardous waste facilities; Siting methodologies; Public participation

  6. Continuation of down-hole geophysical testing for rock sockets.

    DOT National Transportation Integrated Search

    2013-11-01

    Site characterization for the design of deep foundations is crucial for ensuring a reliable and economic substructure design, as unanticipated site conditions can cause significant problems and disputes during construction. Traditional invasive explo...

  7. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  8. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  9. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  10. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  11. Regulatory elements involved in constitutive and phorbol ester-inducible expression of the plasminogen activator inhibitor type 2 gene promoter.

    PubMed Central

    Cousin, E; Medcalf, R L; Bergonzelli, G E; Kruithof, E K

    1991-01-01

    Gene transcription rates and mRNA levels of plasminogen activator inhibitor type 2 (PAI-2) are markedly induced by the tumor promoting agent phorbol 12-myristate 13-acetate (PMA) in human HT1080 fibrosarcoma cells. To identify promoter elements required for basal-, and phorbol ester-inducible expression, deletion mutants of the PAI-1 promoter fused to the chloramphenicol acetyl transferase (CAT) reporter gene, were transiently expressed in HT1080 cells. Constitutive CAT activity was expressed from constructs containing more than 215 bp of promoter sequence, whereas deletion to position -91 bp abolished CAT gene expression. Treatment of transfected cells with PMA resulted in a three- to ten-fold increase in CAT expression from all constructs except from the construct shortened to position -91. DNAse1 protection analysis of the promoter region between -215 and the transcription initiation site revealed numerous protected regions, including two AP1-like binding sites (AP1a and AP1b) and one CRE-like element. Site-directed mutagenesis of the AP1a site or of the CRE-like site resulted in the loss of basal CAT activity and abolished the PMA effect, whereas mutagenesis of AP1b only partially inhibited basal and PMA-mediated expression. Our results suggest that the PAI-2 promoter contains at least two elements required for basal gene transcription and PMA-mediated induction. Images PMID:1650454

  12. Superfund Record of Decision (EPA Region 5): Northside Sanitary Landfill (Enviro-Chem), Zionsville, IN. (First remedial action), (Amendment), June 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Northside Sanitary Landfill site is a hazardous and solid waste disposal facility in Boone County, Indiana. Adjacent to the Northside Sanitary Landfill (NSL) site is another Superfund site, Enviro-Chem which, prior to the Record of Decision (ROD) amendment, was to be remediated in a combined remedy for both sites. Land use in the area is agricultural to the south and east, and residential to the north and west. The ROD amendment provides a comprehensive remedy and addresses both source control and ground water remediation. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene,more » PCE, TCE, and toluene; other organics including phenols; metals including arsenic, chromium, and lead; and oils. The amended remedial action for the site includes constructing a pipeline to pump ground water and leachate offsite to the city sewer system at the city wastewater treatment plant and constructing a hydraulic isolation wall system.« less

  13. Non-destructive measurement of soil liquefaction density change by crosshole radar tomography, Treasure Island, California

    USGS Publications Warehouse

    Kayen, Robert E.; Barnhardt, Walter A.; Ashford, Scott; Rollins, Kyle

    2000-01-01

    A ground penetrating radar (GPR) experiment at the Treasure Island Test Site [TILT] was performed to non-destructively image the soil column for changes in density prior to, and following, a liquefaction event. The intervening liquefaction was achieved by controlled blasting. A geotechnical borehole radar technique was used to acquire high-resolution 2-D radar velocity data. This method of non-destructive site characterization uses radar trans-illumination surveys through the soil column and tomographic data manipulation techniques to construct radar velocity tomograms, from which averaged void ratios can be derived at 0.25 - 0.5m pixel footprints. Tomograms of void ratio were constructed through the relation between soil porosity and dielectric constant. Both pre- and post-blast tomograms were collected and indicate that liquefaction related densification occurred at the site. Volumetric strains estimated from the tomograms correlate well with the observed settlement at the site. The 2-D imagery of void ratio can serve as high-resolution data layers for numerical site response analysis.

  14. 40 CFR Table 6 to Subpart Fff of... - Site-Specific Compliance Schedules and Increments of Progress a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...

  15. 40 CFR Table 6 to Subpart Fff of... - Site-Specific Compliance Schedules and Increments of Progress a

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Site-Specific Compliance Schedules and... Constructed on or Before September 20, 1994 Pt. 62, Subpt. FFF, Table 6 Table 6 to Subpart FFF of Part 62—Site-Specific Compliance Schedules and Increments of Progress a Affected facilities at the following MWC sites...

  16. Lessons Learned from Radioactive Waste Storage and Disposal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esh, David W.; Bradford, Anna H.

    2008-01-15

    The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. Thismore » paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are discussed: commercial LLW disposal facilities; uranium mill tailings disposal facilities; and reprocessing waste storage and disposal facilities. The observations developed from the monitoring and maintenance of waste disposal and storage facilities provide valuable lessons learned for the design and modeling of future waste disposal facilities and the decommissioning of complex sites.« less

  17. 77 FR 57495 - National Priorities List, Final Rule No. 55

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... EPA is responsible for preparing a Hazard Ranking System (``HRS'') score and determining whether the... an NPL construction completion list (``CCL'') to simplify its system of categorizing sites and to...). Inclusion of a site on the CCL has no legal significance. Sites qualify for the CCL when: (1) Any necessary...

  18. Security Design Flaws That Affect Usability in Online Banking

    ERIC Educational Resources Information Center

    Gurlen, Stephanie

    2013-01-01

    As the popularity of online banking Websites has increased, the security of these sites has become increasingly critical as attacks against these sites are on the rise. However, the design decisions made during construction of the sites could make usability more difficult, where the user has difficulty making good security decisions. This study…

  19. HIV testing of construction workers in the Western Cape, South Africa.

    PubMed

    Bowen, Paul; Govender, Rajen; Edwards, Peter; Cattell, Keith

    2015-01-01

    With an infection rate estimated at 14%, the South African construction industry is one of the economic sectors most adversely affected by the HIV/AIDS pandemic. Construction workers are considered a high-risk group. The provision and uptake of voluntary counselling and testing (VCT) is critical to reducing transmission rates. This study examined the testing behaviour of site-based construction workers in terms of demographic and lifestyle risk behaviour characteristics to help inform better strategies for work-based interventions by construction firms. A total of 512 workers drawn from six firms operating on 18 construction sites in the Western Cape province participated in the study. Twenty-seven per cent of the participants reported never having been tested for HIV. Results indicate that females (aOR = 4.45, 95% CI, 1.25-15.82), older workers (aOR = 1.40, 95% CI, 1.08-1.81), permanent workers (aOR = 1.67, 95% CI, 1.11-2.50) and workers whom had previously used a condom (aOR = 1.93, 95% CI, 1.02-3.65) were significantly more likely to have been tested. Ethnicity was not significantly related to prior testing. Identification of these subgroups within the industry has implications for the development of targeted work-based intervention programmes to promote greater HIV testing among construction workers in South Africa.

  20. [Breath alcohol test in construction sites in the Province of Belluno: a campaign in favour of health promotion and surveillance and against drinking].

    PubMed

    Marcolina, Daniela; De Marzo, Nicoletta; Riccio, Maria Teresa

    2011-01-01

    Health impairment due to alcohol use and abuse is well known, in terms of relationship with traffic accidents and work accidents. In Italy almost 10 per cent of accidents at work involve intoxicated people injuring themselves and innocent victims. Alcohol abuse is a factor involved in determining severe accidents in the construction industry and epidemiological studies demonstrated a relationship between an elevated alcohol use and severity of accidents. Since in the Province of Belluno alcohol consumption may be elevated also at work, the two Occupational Health Units (SPISAL) in the province organized a campaign of information and surveillance against alcohol consumption at work in the construction industry. This report shows the campaign results, mainly in terms of breath alcohol tests performed in construction workers. After an extensive information campaign we inspected 50 sites, where 105 construction companies were at work, and tested 294 workers by breath alcohol test. No-one refused the test. Only 2.7% construction workers were positive for the breath alcohol test, and the levels were not elevated. This study shows that the construction workers in Belluno Province are responsible drinkers and are well aware of the policy of prohibition of alcohol consumption at work.

  1. [A site index model for Larix principis-rupprechtii plantation in Saihanba, north China].

    PubMed

    Wang, Dong-zhi; Zhang, Dong-yan; Jiang, Feng-ling; Bai, Ye; Zhang, Zhi-dong; Huang, Xuan-rui

    2015-11-01

    It is often difficult to estimate site indices for different types of plantation by using an ordinary site index model. The objective of this paper was to establish a site index model for plantations in varied site conditions, and assess the site qualities. In this study, a nonlinear mixed site index model was constructed based on data from the second class forest resources inventory and 173 temporary sample plots. The results showed that the main limiting factors for height growth of Larix principis-rupprechtii were elevation, slope, soil thickness and soil type. A linear regression model was constructed for the main constraining site factors and dominant tree height, with the coefficient of determination being 0.912, and the baseline age of Larix principis-rupprechtii determined as 20 years. The nonlinear mixed site index model parameters for the main site types were estimated (R2 > 0.85, the error between the predicted value and the actual value was in the range of -0.43 to 0.45, with an average root mean squared error (RMSE) in the range of 0.907 to 1.148). The estimation error between the predicted value and the actual value of dominant tree height for the main site types was in the confidence interval of [-0.95, 0.95]. The site quality of the high altitude-shady-sandy loam-medium soil layer was the highest and that of low altitude-sunny-sandy loam-medium soil layer was the lowest, while the other two sites were moderate.

  2. 25 CFR 1000.244 - May the Secretary suspend construction activities under an AFA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... construction activities under an AFA? (a) The Secretary may require a Tribe/Consortium to suspend certain work under a construction portion of an AFA for up to 30 days only if: (1) Site conditions adversely affect health and safety; or (2) Work in progress or completed fails to substantially carry out the terms of the...

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  4. Assessment of the Lunar Surface Layer and in Situ Materials to Sustain Construction-related Applications

    NASA Technical Reports Server (NTRS)

    Johnson, Stewart W.; Chua, Koon Meng

    1992-01-01

    Present and future technologies to facilitate lunar composition and resource assessment with applications to lunar surface construction are presented. We are particularly interested in the construction activity associated with lunar-based astronomy. We address, as an example, the use of ground-probing radar to help assess subsurface conditions at sites for observatories and other facilities.

  5. Modeling of fugitive dust emission for construction sand and gravel processing plant.

    PubMed

    Lee, C H; Tang, L W; Chang, C T

    2001-05-15

    Due to rapid economic development in Taiwan, a large quantity of construction sand and gravel is needed to support domestic civil construction projects. However, a construction sand and gravel processing plant is often a major source of air pollution, due to its associated fugitive dust emission. To predict the amount of fugitive dust emitted from this kind of processing plant, a semiempirical model was developed in this study. This model was developed on the basis of the actual dust emission data (i.e., total suspended particulate, TSP) and four on-site operating parameters (i.e., wind speed (u), soil moisture (M), soil silt content (s), and number (N) of trucks) measured at a construction sand and gravel processing plant. On the basis of the on-site measured data and an SAS nonlinear regression program, the expression of this model is E = 0.011.u2.653.M-1.875.s0.060.N0.896, where E is the amount (kg/ton) of dust emitted during the production of each ton of gravel and sand. This model can serve as a facile tool for predicting the fugitive dust emission from a construction sand and gravel processing plant.

  6. Investigating risk factors for slips, trips and falls in New Zealand residential construction using incident-centred and incident-independent methods.

    PubMed

    Bentley, Tim A; Hide, Sophie; Tappin, David; Moore, Dave; Legg, Stephen; Ashby, Liz; Parker, Richard

    2006-01-15

    Slip, trip and fall (STF) incidents, particularly falls from a height, are a leading cause of injury in the New Zealand residential construction industry. The most common origins of falls from a height in this sector are ladders, scaffolding and roofs, while slipping is the most frequent fall initiating event category. The study aimed to provide detailed information on construction industry STF risk factors for high-risk tasks, work equipment and environments, as identified from an earlier analysis of STF claims data, together with information to be used in the development of interventions to reduce STF risk in New Zealand residential construction. The study involved the use of both incident-centred and incident-independent methods of investigation, including detailed follow-up investigations of incidents and observations and interviews with workers on construction sites, to provide data on a wide range of risk factors. A large number of risk factors for residential construction STFs were identified, including factors related to the work environment, tasks and the use and availability of appropriate height work equipment. The different methods of investigation produced complementary information on factors related to equipment design and work organization, which underlie some of the site conditions and work practices identified as key risk factors for residential construction STFs. A conceptual systems model of residential construction STF risk is presented.

  7. On the Seismic Safety of Nuclear Power Plant Sites in South Korea

    NASA Astrophysics Data System (ADS)

    Choi, H.; Park, S.; Yang, J.; Shim, T.; Im, C. B.

    2016-12-01

    The Korean Peninsula is located at the far eastern part of Eurasian Plate, and within the intra-plate region several hundred km away from the nearest plate boundary. The earthquakes around the Korean Peninsula show the typical characteristics of intra-plate earthquakes. So to speak, those are low seismicity, relatively smaller magnitude than that of inter-plate earthquakes, and spatially irregular epicenters. There are 24 nuclear power plants (NPPs) in operation, 4 NPPs in completion of construction, and 4 NPPs in preparation of construction in South Korea. Even though the seismicity of the Korean Peninsula is known as relatively low, but because there are more than 30 NPPs within not so large territory, thorough the preparedness of NPPs' safety against earthquakes is required. The earthquake preparedness of NPPs in South Korea is composed of 4 stages: site election, design, construction and operation. Since regulatory codes and standards are strictly applied in each stage, the NPPs in South Korea are believed to be safe enough against the maximum potential earthquake ground motion. Through data analysis on geological and seismological characteristics of the region within a radius of 320 km from the site and the detailed geological survey of the area within a radius of 8 km from the site, the design earthquake ground motion of NPPs in South Korea is determined to be 0.2g (in case of newly constructed NPPs is 0.3g) considering the maximum potential earthquake ground motion and some safety margin. The ground motions and surface deformation caused by capable faults are also considered in the seismic design of NPPs. In addition, the Korea Institute of Nuclear Safety as a regulatory technical expert organization, has been operating independent real time earthquake monitoring network as a part of securing the seismic safety of NPP sites in South Korea since late 1990's. If earthquakes with more than magnitude 3.0 are occurred in the Korean Peninsula or the peak ground motions with more than 0.01g are occurred in NPP sites, such information is reported to the government and shared to the public through the website including the information of the seismic safety of NPP sites.

  8. 77 FR 2083 - Notice of Inventory Completion: Minnesota Indian Affairs Council, Bemidji, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... the north side of Height of Land Lake, site 21BK48, by Mr. William Krause during road construction and... near Ice Cracking Lake during road construction and donated to the Becker County Historical Society (HR...

  9. Ground vibration investigation at highway construction sites : final report.

    DOT National Transportation Integrated Search

    1975-06-01

    The purpose of this study was to measure vibration magnitudes on construction projects in terms of particle velocity rather than particle displacement or acceleration. Peak particle velocity was chosen as the best means of measurement after the U.S. ...

  10. 40 CFR 232.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limitations or prohibitions under section 307(a), and applicable water quality standards. Discharge of dredged..., infrastructure, or impoundment requiring rock, sand, dirt, or other material for its construction; site... include, but are not limited to: rock, sand, soil, clay, plastics, construction debris, wood chips...

  11. Functional characterization of transcription factor binding sites for HNF1-alpha, HNF3-beta (FOXA2), HNF4-alpha, Sp1 and Sp3 in the human prothrombin gene enhancer.

    PubMed

    Ceelie, H; Spaargaren-Van Riel, C C; De Jong, M; Bertina, R M; Vos, H L

    2003-08-01

    Prothrombin is a key component in blood coagulation. Overexpression of prothrombin leads to an increased risk of venous thrombosis. Therefore, the study of the transcriptional regulation of the prothrombin gene may help to identify mechanisms of overexpression. The aim of our study was to localize the regions within the prothrombin enhancer responsible for its activity, to identify the proteins binding to these regions, and to establish their functional importance. We constructed a set of prothrombin promoter 5' deletion constructs containing the firefly luciferase reporter gene, which were transiently transfected in HepG2, HuH7 and HeLa cells. Putative transcription factor (TF) binding sites were evaluated by electrophoretic mobility shift assays. The functional importance of each TF binding site was evaluated by site directed mutagenesis and transient transfection of the mutant constructs. We confirmed the major contribution of the enhancer region to the transcriptional activity of the prothrombin promoter. Analysis of this region revealed putative binding sites for hepatocyte nuclear factor HNF4, HNF3-beta and specificity protein(Sp)1. We identified six different TFs binding to three evolutionary conserved sites in the enhancer: HNF4-alpha (site 1), HNF1-alpha, HNF3-beta and an as yet unidentified TF (site 2) and the ubiquitously expressed TFs Sp1 and Sp3 (site 3). Mutagenesis studies showed that loss of binding of HNF3-beta resulted in a considerable decrease of enhancer activity, whereas loss of HNF4-alpha or Sp1/Sp3 resulted in milder reductions. The prothrombin enhancer plays a major role in regulation of prothrombin expression. Six different TFs are able to bind to this region. At least three of these TFs, HNF4-alpha, HNF3-beta and Sp1/Sp3, are important in regulation of prothrombin expression.

  12. 7 CFR 3560.608 - Site and construction requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... will be consistent with the requirements, standards, and cost limits specified in subpart B of this... accordance with 7 CFR part 1924, subparts A and C. (2) Sites must be accessible from a public road, when...

  13. 7 CFR 3560.608 - Site and construction requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... will be consistent with the requirements, standards, and cost limits specified in subpart B of this... accordance with 7 CFR part 1924, subparts A and C. (2) Sites must be accessible from a public road, when...

  14. 76 FR 76048 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... of the Site proposed for deletion, is available in the deletion docket: Site Location and History The... State Welding and Marine Works and the Golden Triangle Shipyard. The construction of wastewater...

  15. 23. Surrender interview site, showing Pemberton Avenue concrete slab road ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Surrender interview site, showing Pemberton Avenue concrete slab road type with gutter (asphalt construction typical on Union and Confederate Avenues), view to the sw. - Vicksburg National Military Park Roads & Bridges, Vicksburg, Warren County, MS

  16. 41 CFR 102-73.255 - What factors must Executive agencies consider when purchasing sites?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must consider factors such as whether the site will contribute to economy and efficiency in the... Government's total space needs in the community. Prior to acquiring, constructing, or leasing buildings (or...

  17. Submillimeter atmospheric FTS at the geographic South Pole

    NASA Astrophysics Data System (ADS)

    Chamberlin, Richard A.; Martin, Robert N.; Martin, Christopher L.; Stark, Antony A.

    2003-02-01

    A submillimeter Fourier Transform Spectrometer of the Martin-Puplett type was constructed and deployed to the geographical South Pole in 2001. The instrument operates from about 300 GHz to almost 2 THz and was used over winter to acquire atmospheric spectra with resolution as fine as 250 MHz. The main motivation for constructing and deploying this FTS was for astronomical site testing, but the obtained spectra can have important secondary uses in atmospheric science and transmission model validation. Some preliminary, low spectral resolution site testing results are presented here.

  18. Cleanup Verification Package for the 118-F-1 Burial Ground

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. J. Farris and H. M. Sulloway

    2008-01-10

    This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

  19. Channel erosion surveys along the TAPS route, Alaska, 1977

    USGS Publications Warehouse

    Loeffler, Robert M.; Childers, Joseph M.

    1977-01-01

    Channel surveys were made along the trans-Alaska pipeline system (TAPS) route during 1977 at the same 28 sites that were studied in 1976. In addition, a new site at pipeline mile 22 near Deadhorse (alignment No 134) along the Sagavanirktok River was put under surveillance. Except for changes wrought by the completion of construction, most of the sites showed very little change. Significant events include virtual completion of all construction activities along the pipeline, the pipeline startup , and the breakup flood along the Sagavanirktok River which breached many river-training structures. In general, 1977 saw heavy flooding on streams draining the north and south slopes of the Brooks Range and only moderate flooding on streams further south. Aerial photogrammetric surveys were used again in 1977 on the same seven sites as in 1976. Results document the applicability of the method for channel erosion studies. (Woodard-USGS)

  20. A system to test the ground surface conditions of construction sites--for safe and efficient work without physical strain.

    PubMed

    Koningsveld, Ernst; van der Grinten, Maarten; van der Molen, Henk; Krause, Frank

    2005-07-01

    Ground surface conditions on construction sites have an important influence on the health and safety of workers and their productivity. The development of an expert-based "working conditions evaluation" system is described, intended to assist site managers in recognising unsatisfactory ground conditions and remedying these. The system was evaluated in the period 2002-2003. The evaluation shows that companies recognize poor soil/ground conditions as problematic, but are not aware of the specific physical workload hazards. The developed methods allow assessment of the ground surface quality and selection of appropriate measures for improvement. However, barriers exist at present to wide implementation of the system across the industry. Most significant of these is that responsibility for a site's condition is not clearly located within contracting arrangements, nor is it a topic of serious negotiation.

  1. Hydroisomerization of n-Hexane Using Acidified Metal-Organic Framework and Platinum Nanoparticles.

    PubMed

    Sabyrov, Kairat; Jiang, Juncong; Yaghi, Omar M; Somorjai, Gabor A

    2017-09-13

    Exceptionally high surface area and ordered nanopores of a metal-organic framework (MOF) are exploited to encapsulate and homogeneously disperse a considerable amount of phosphotungstic acid (PTA). When combined with platinum nanoparticles positioned on the external surface of the MOF, the construct shows a high catalytic activity for hydroisomerization of n-hexane, a reaction requiring hydrogenation/dehydrogenation and moderate to strong Brønsted acid sites. Characterization of the catalytic activity and acidic sites as a function of PTA loading demonstrates that both the concentration and strength of acidic sites are highest for the catalyst with the largest amount of PTA. The MOF construct containing 60% PTA by weight produces isoalkanes with 100% selectivity and 9-fold increased mass activity as compared to a more traditional aluminosilicate catalyst, further demonstrating the capacity of the MOF to contain a high concentration of active sites necessary for the isomerization reaction.

  2. Session: Development and application of guidelines for siting, constructing, operating and monitoring wind turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manville, Albert; Hueckel, Greg

    2004-09-01

    This session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The two papers were: 'Development and Application of USFWS Guidance for Site Evaluation, Siting, Construction, Operation and Monitoring of Wind Turbines' by Albert Manville and 'Wind Power in Washington State' by Greg Hueckel. The session provided a comparison of wind project guidelines developed by the U.S. Fish and Wildlife Service (USFWS) in May 2003 and the Washington State Department of Fish and Wildlife in August 2003. Questions addressed included: is there a need or desire for uniform national or statemore » criteria; can other states learn from Washington State's example, or from the USFWS voluntary guidelines; should there be uniform requirements/guidelines/check-lists for the siting, operation, monitoring, and mitigation to prevent or minimize avian, bat, and other wildlife impacts.« less

  3. A Rout to Protect Quantum Gates constructed via quantum walks from Noises.

    PubMed

    Du, Yi-Mu; Lu, Li-Hua; Li, You-Quan

    2018-05-08

    The continuous-time quantum walk on a one-dimensional graph of odd number of sites with an on-site potential at the center is studied. We show that such a quantum-walk system can construct an X-gate of a single qubit as well as a control gate for two qubits, when the potential is much larger than the hopping strength. We investigate the decoherence effect and find that the coherence time can be enhanced by either increasing the number of sites on the graph or the ratio of the potential to the hopping strength, which is expected to motivate the design of the quantum gate with long coherence time. We also suggest several experimental proposals to realize such a system.

  4. Enhancing rescue-archaeology using geomorphological approaches: Archaeological sites in Paredes (Asturias, NW Spain)

    NASA Astrophysics Data System (ADS)

    Jiménez-Sánchez, M.; González-Álvarez, I.; Requejo-Pagés, O.; Domínguez-Cuesta, M. J.

    2011-09-01

    Palaeolithic remnants, a Necropolis (Roman villa), and another minor archaeological site were discovered in Paredes (Spain). These sites were the focus of multidisciplinary research during the construction of a large shopping centre in Asturias (NW Spain). The aims of this study are (1) to contribute to archaeological prospection in the sites and (2) to develop evolutionary models of the sites based on geomorphological inferences. Detailed archaeological prospection (103 trenches), geomorphologic mapping, stratigraphic studies (36 logs) and ground penetration radar (GPR) surveys on five profiles indicate that the location of the settlement source of the Necropolis is outside the construction perimeter, farther to the southeast. The Pre-Holocene evolution of the fluvial landscape is marked by the development of two terraces (T1 and T2) that host the Early Palaeolithic remains in the area (ca 128-71 ka). The Holocene evolution of the landscape was marked by the emplacement of the Nora River flood plain, covered by alluvial fans after ca. 9 ka BP (cal BC 8252-7787). Subsequently, Neolithic pebble pits dated ca. 5.3 ka BP (cal BC 4261-3963 and 4372-4051) were constructed on T2, at the area reoccupied as a Necropolis during the Late Roman period, 1590 ± 45 years BP (cal AD 382-576). Coeval human activity during the Late Roman period at 1670 ± 60 years BP (cal AD 320-430) is also recorded by channel infill sediments in a minor site at the margin of an alluvial fan located to the southeast. This work shows that a rescue-archaeological study can be significantly enhanced by the implementation of multidisciplinary scientific studies, in which the holistic view of geomorphologic settings provide key insights into the geometry and evolution of archaeological sites.

  5. Nutritional and food insecurity of construction workers.

    PubMed

    de Lima Brasil, Evi Clayton; de Araújo, Lindemberg Medeiros; de Toledo Vianna, Rodrigo Pinheiro

    2016-06-27

    Construction workers have intensive contact with their workplace and are possibly susceptible to Nutritional and Food Insecurity. This paper assessed the Food Security status, diet and anthropometric measures of workers in the Construction Industry living in the city of João Pessoa, PB. This cross-sectional study included 59 workers housed at construction sites. The workers were given the Brazilian Scale for Measuring Food Insecurity and Nutrition, had anthropometric measures taken and completed the Diet Quality Index, comparing their eating at the construction site and at home. Statistical analyses described the mean, standard deviation, frequency and Pearson correlations. Food Insecurity was reported by 71.2% of the workers, and 69.5% were overweight. The mean values of the Healthy Eating Index suggested that the workers' diets were in need of modification. There were statistically significant inverse associations among the Healthy Eating Index and Body Mass Index, waist circumference, percentage of total fat and cholesterol. Values obtained using the Scale showed Food Insecurity coupled with high excess weight and dietary inadequacies, revealing that these workers are at risk for health problems.

  6. Remote vibration monitoring system using wireless internet data transfer

    NASA Astrophysics Data System (ADS)

    Lemke, John

    2000-06-01

    Vibrations from construction activities can affect infrastructure projects in several ways. Within the general vicinity of a construction site, vibrations can result in damage to existing structures, disturbance to people, damage to sensitive machinery, and degraded performance of precision instrumentation or motion sensitive equipment. Current practice for monitoring vibrations in the vicinity of construction sites commonly consists of measuring free field or structural motions using velocity transducers connected to a portable data acquisition unit via cables. This paper describes an innovative way to collect, process, transmit, and analyze vibration measurements obtained at construction sites. The system described measures vibration at the sensor location, performs necessary signal conditioning and digitization, and sends data to a Web server using wireless data transmission and Internet protocols. A Servlet program running on the Web server accepts the transmitted data and incorporates it into a project database. Two-way interaction between the Web-client and the Web server is accomplished through the use of a Servlet program and a Java Applet running inside a browser located on the Web client's computer. Advantages of this system over conventional vibration data logging systems include continuous unattended monitoring, reduced costs associated with field data collection, instant access to data files and graphs by project team members, and the ability to remotely modify data sampling schemes.

  7. Ribosomal Binding Site Switching: An Effective Strategy for High-Throughput Cloning Constructions

    PubMed Central

    Li, Yunlong; Zhang, Yong; Lu, Pei; Rayner, Simon; Chen, Shiyun

    2012-01-01

    Direct cloning of PCR fragments by TA cloning or blunt end ligation are two simple methods which would greatly benefit high-throughput (HTP) cloning constructions if the efficiency can be improved. In this study, we have developed a ribosomal binding site (RBS) switching strategy for direct cloning of PCR fragments. RBS is an A/G rich region upstream of the translational start codon and is essential for gene expression. Change from A/G to T/C in the RBS blocks its activity and thereby abolishes gene expression. Based on this property, we introduced an inactive RBS upstream of a selectable marker gene, and designed a fragment insertion site within this inactive RBS. Forward and reverse insertions of specifically tailed fragments will respectively form an active and inactive RBS, thus all background from vector self-ligation and fragment reverse insertions will be eliminated due to the non-expression of the marker gene. The effectiveness of our strategy for TA cloning and blunt end ligation are confirmed. Application of this strategy to gene over-expression, a bacterial two-hybrid system, a bacterial one-hybrid system, and promoter bank construction are also verified. The advantages of this simple procedure, together with its low cost and high efficiency, makes our strategy extremely useful in HTP cloning constructions. PMID:23185557

  8. Data collected to support monitoring of constructed emergent sandbar habitat on the Missouri River downstream from Gavins Point Dam, South Dakota and Nebraska, 2004-06

    USGS Publications Warehouse

    Thompson, Ryan F.; Johnson, Michaela R.; Andersen, Michael J.

    2007-01-01

    The U.S. Army Corps of Engineers has constructed emergent sandbar habitat on sections of the Missouri River bordering South Dakota and Nebraska downstream from Gavins Point Dam to create and enhance habitat for threatened and endangered bird species. Two areas near river miles 761.3 and 769.8 were selected for construction of emergent sandbar habitat. Pre- and postconstruction data were collected by the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, to evaluate the success of the habitat management techniques. Data collected include pre- and postconstruction channel-geometry data (bathymetric and topographic) for areas upstream from, downstream from, and within each construction site. Water-velocity data were collected for selected parts of the site near river mile 769.8. Instruments and methods used in data collection, as well as quality-assurance and quality-control measures, are described. Geospatial channel-geometry data are presented for transects of the river channel as cross sections and as geographical information system shapefiles. Geospatial land-surface elevation data are provided for part of each site in the form of a color-shaded relief map. Geospatial water-velocity data also are provided as color-shaded maps and geographical information system shapefiles.

  9. Mortality of older construction and craft workers employed at Department of Energy (DOE) nuclear sites.

    PubMed

    Dement, John M; Ringen, Knut; Welch, Laura S; Bingham, Eula; Quinn, Patricia

    2009-09-01

    The U.S. Department of Energy (DOE) established medical screening programs at the Hanford Nuclear Reservation, Oak Ridge Reservation, the Savannah River Site, and the Amchitka site starting in 1996. Workers participating in these programs have been followed to determine their vital status and mortality experience through December 31, 2004. A cohort of 8,976 former construction workers from Hanford, Savannah River, Oak Ridge, and Amchitka was followed using the National Death Index through December 31, 2004, to ascertain vital status and causes of death. Cause-specific standardized mortality ratios (SMRs) were calculated based on US death rates. Six hundred and seventy-four deaths occurred in this cohort and overall mortality was slightly less than expected (SMR = 0.93, 95% CI = 0.86-1.01), indicating a "healthy worker effect." However, significantly excess mortality was observed for all cancers (SMR = 1.28, 95% CI = 1.13-1.45), lung cancer (SMR = 1.54, 95% CI = 1.24-1.87), mesothelioma (SMR = 5.93, 95% CI = 2.56-11.68), and asbestosis (SMR = 33.89, 95% CI = 18.03-57.95). Non-Hodgkin's lymphoma was in excess at Oak Ridge and multiple myeloma was in excess at Hanford. Chronic obstructive pulmonary disease (COPD) was significantly elevated among workers at the Savannah River Site (SMR = 1.92, 95% CI = 1.02-3.29). DOE construction workers at these four sites were found to have significantly excess risk for combined cancer sites included in the Department of Labor' Energy Employees Occupational Illness Compensation Program (EEOCIPA). Asbestos-related cancers were significantly elevated. (c) 2009 Wiley-Liss, Inc.

  10. 14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1120. Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1-120. Specifications No. OC2-55-72; Drawing No. 60-09-12; sheet 7 of 148; file no. 1320/58, Rev. C. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338 Rev. C, Date: 16 April 1957. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  11. Technology Tips: Using the Iterate Command to Construct Recursive Geometric Sketches

    ERIC Educational Resources Information Center

    Harper, Suzanne R.; Driskell, Shannon

    2006-01-01

    How to iterate geometric shapes to construct Baravelle spirals and Pythagorean trees is demonstrated in this article. The "Surfing Note" sends readers to a site with applets that will generate fractals such as the Sierpinski gasket or the Koch snowflake.

  12. 77 FR 11140 - Availability of the Draft Supplementary Risk Assessment for the Boston University (BU) National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... environments. The urban, suburban, and rural sites that were selected for the purposes of the comparative... construction grant to Boston University Medical Campus to partly fund the design and construction of one of two...

  13. Seasonal variability of near surface soil water and groundwater tables in Florida : phase II [summary].

    DOT National Transportation Integrated Search

    2008-01-01

    Reliable predictions of the seasonal high : groundwater table (SHGWT) at potential : construction sites are critical for roadway : designs. Maximum SHGWT levels can affect the : construction and maintenance of roads, and : the design and operation of...

  14. Millwright Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Pierce, Greg

    This manual contains instructional materials for use in training millwrights working in industrial and commercial construction sites. Intended as an innovative complement to on-the-job training in construction, the material is written in terms of student performance using behavioral objectives and measured by criterion-referenced evaluation…

  15. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  16. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  17. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  18. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  19. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  20. The concept of value stream mapping to reduce of work-time waste as applied the smart construction management

    NASA Astrophysics Data System (ADS)

    Elizar, Suripin, Wibowo, Mochamad Agung

    2017-11-01

    Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.

  1. A novel, easy and rapid method for constructing yeast two-hybrid vectors using In-Fusion technology.

    PubMed

    Yu, Deshui; Liao, Libing; Zhang, Ju; Zhang, Yi; Xu, Kedong; Liu, Kun; Li, Xiaoli; Tan, Guangxuan; Chen, Ran; Wang, Yulu; Liu, Xia; Zhang, Xuan; Han, Xiaomeng; Wei, Zhangkun; Li, Chengwei

    2018-05-01

    Yeast two-hybrid systems are powerful tools for analyzing interactions between proteins. Vector construction is an essential step in yeast two-hybrid experiments, which require bait and prey plasmids. In this study, we modified the multiple cloning site sequence of the yeast plasmid pGADT7 by site-directed mutagenesis PCR to generate the pGADT7-In vector, which resulted in an easy and rapid method for constructing yeast two-hybrid vectors using the In-Fusion cloning technique. This method has three key advantages: only one pair of primers and one round of PCR are needed to generate bait and prey plasmids for each gene, it is restriction endonuclease- and ligase-independent, and it is fast and easily performed.

  2. Water-quality, well-construction, and ground-water level data for an investigation of radionuclides in ground water, Hickman and Maury counties, Tennessee

    USGS Publications Warehouse

    Hileman, G.E.

    1990-01-01

    Water quality, well construction, and groundwater level data were collected for an investigation of radionuclides in groundwater in Maury and Hickman Counties, Tennessee. Seventeen wells and 3 springs were sampled in Hickman County, and 20 wells were sampled in Maury County. Samples from each site were analyzed for radionuclides, common and trace inorganic ions, indicators of redox conditions, selected nutrients, total organic carbon, and selected physical characteristics. Well-construction data were obtained to help determine the source of the water. Where possible, groundwater level measurements were made for each well sampled. Samples were collected from May 1989 through mid-August 1989. Data are presented in tables. Maps of each county show the location of the sites sampled. (USGS)

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Byoung Yoon; Roberts, Barry L.

    The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill,more » Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.« less

  4. New "persona" concept helps site designers cater to target user segments' needs.

    PubMed

    2004-09-01

    Using the relatively new "persona" design concept, Web strategists create a set of archetypical user characters, each one representing one of their site's primary audiences. Then, as their site is constructed or upgraded, they champion the personas, arguing on their behalf and forcing the design team to take each audience's needs and wants into account.

  5. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  6. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  7. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  8. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  9. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  10. Building Student-Centered Web Sites in the K12 Classroom.

    ERIC Educational Resources Information Center

    Hall, Alison; Basile, Brigitte

    This paper examines the process of constructing a student-centered World Wide Web site and provides recommendations for improving this process. In the project, preservice teachers instructed the fifth grade students about how to design and develop a Web site on weather. The topics of the sessions included Internet ethics, using the Web,…

  11. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance and docketing of application for early review... Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2...

  12. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... WASTE Siting Evaluation Factors § 72.98 Identifying regions around an ISFSI or MRS site. (a) The... ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  13. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... WASTE Siting Evaluation Factors § 72.98 Identifying regions around an ISFSI or MRS site. (a) The... ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  14. Reliability of mobile systems in construction

    NASA Astrophysics Data System (ADS)

    Narezhnaya, Tamara; Prykina, Larisa

    2017-10-01

    The purpose of the article is to analyze the influence of the mobility of construction production in the article taking into account the properties of reliability and readiness. Basing on the studied systems the effectiveness and efficiency is estimated. The construction system is considered to be the complete organizational structure providing creation or updating of construction facilities. At the same time the production sphere of these systems joins the production on the building site itself, material and technical resources of the construction production and live labour in these spheres within the construction dynamics. The author concludes, that the estimation of the degree of mobility of systems the of construction production makes a great positive effect in the project.

  15. Performance Probability Distributions for Sediment Control Best Management Practices

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R.; Walsh, K.

    2007-12-01

    Controlling soil erosion and sediment transport can be a significant challenge during the construction process due to the extent and conditions of bare, disturbed soils. Best Management Practices (BMPs) are used as the framework for the design of sediment discharge prevention systems in stormwater pollution prevention plans which are typically required for construction sites. This research focuses on commonly-used BMP systems for perimeter control of sediment export: silt fences and fiber rolls. Although these systems are widely used, the physical and engineering parameters describing their performance are not well understood. Performance expectations are based on manufacturer results, but due to the dynamic conditions that exist on a construction site performance expectations are not always achievable in the field. Based on experimental results product performance is shown to be highly variable. Experiments using the same installation procedures show inconsistent sediment removal performances ranging from (>)85 percent to zero. The goal of this research is to improve the determination of off-site sediment yield based on probabilistic performance results of perimeter control BMPs. BMPs are evaluated in the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with a soil depth of 0.5 meters and a slope of 33 percent. The simulated storm event consists of 17 mm/hr for 20 minutes followed by 51 mm/hr for 30 minutes. The storm event is based on an ASTM design storm intended to simulate BMP failures. BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, less than optimal installations, and no treatment conditions. Preliminary results from 30 experiments are presented and used to develop probability distributions for BMP sediment removal efficiencies. The results are then combined with spatial and temporal distributions of perimeter sediment loadings for a construction site to estimate the time dependent risk of off-site sediment discharge over the duration of a project (ex., 0, 25, 50, 75 and 100 percent complete). The results are used to highlight the importance of considering all phases of construction when developing stormwater pollution prevention plans.

  16. Excavation and aggregation as organizing factors in de novo construction by mound-building termites.

    PubMed

    Green, Ben; Bardunias, Paul; Turner, J Scott; Nagpal, Radhika; Werfel, Justin

    2017-06-14

    Termites construct complex mounds that are orders of magnitude larger than any individual and fulfil a variety of functional roles. Yet the processes through which these mounds are built, and by which the insects organize their efforts, remain poorly understood. The traditional understanding focuses on stigmergy, a form of indirect communication in which actions that change the environment provide cues that influence future work. Termite construction has long been thought to be organized via a putative 'cement pheromone': a chemical added to deposited soil that stimulates further deposition in the same area, thus creating a positive feedback loop whereby coherent structures are built up. To investigate the detailed mechanisms and behaviours through which termites self-organize the early stages of mound construction, we tracked the motion and behaviour of major workers from two Macrotermes species in experimental arenas. Rather than a construction process focused on accumulation of depositions, as models based on cement pheromone would suggest, our results indicated that the primary organizing mechanisms were based on excavation. Digging activity was focused on a small number of excavation sites, which in turn provided templates for soil deposition. This behaviour was mediated by a mechanism of aggregation, with termites being more likely to join in the work at an excavation site as the number of termites presently working at that site increased. Statistical analyses showed that this aggregation mechanism was a response to active digging, distinct from and unrelated to putative chemical cues that stimulate deposition. Agent-based simulations quantitatively supported the interpretation that the early stage of de novo construction is primarily organized by excavation and aggregation activity rather than by stigmergic deposition. © 2017 The Author(s).

  17. Excavation and aggregation as organizing factors in de novo construction by mound-building termites

    PubMed Central

    Bardunias, Paul; Turner, J. Scott; Nagpal, Radhika; Werfel, Justin

    2017-01-01

    Termites construct complex mounds that are orders of magnitude larger than any individual and fulfil a variety of functional roles. Yet the processes through which these mounds are built, and by which the insects organize their efforts, remain poorly understood. The traditional understanding focuses on stigmergy, a form of indirect communication in which actions that change the environment provide cues that influence future work. Termite construction has long been thought to be organized via a putative ‘cement pheromone’: a chemical added to deposited soil that stimulates further deposition in the same area, thus creating a positive feedback loop whereby coherent structures are built up. To investigate the detailed mechanisms and behaviours through which termites self-organize the early stages of mound construction, we tracked the motion and behaviour of major workers from two Macrotermes species in experimental arenas. Rather than a construction process focused on accumulation of depositions, as models based on cement pheromone would suggest, our results indicated that the primary organizing mechanisms were based on excavation. Digging activity was focused on a small number of excavation sites, which in turn provided templates for soil deposition. This behaviour was mediated by a mechanism of aggregation, with termites being more likely to join in the work at an excavation site as the number of termites presently working at that site increased. Statistical analyses showed that this aggregation mechanism was a response to active digging, distinct from and unrelated to putative chemical cues that stimulate deposition. Agent-based simulations quantitatively supported the interpretation that the early stage of de novo construction is primarily organized by excavation and aggregation activity rather than by stigmergic deposition. PMID:28615497

  18. A Bayesian assessment of the effect of highway bypasses in Iowa on crashes and crash rate.

    PubMed

    Cena, Lorenzo G; Keren, Nir; Li, Wen; Carriquiry, Alicia L; Pawlovich, Michael D; Freeman, Steven A

    2011-08-01

    A common contention is that the construction of highway bypasses negatively impacts the economy of local communities by reducing pass-by traffic for businesses. However, as access to specific business' account records is limited, this impact is difficult to quantify. Another common contention is that bypasses contribute to a reduction in overall crashes in the community and in the surrounding areas. Even though a large number of bypasses have been constructed in the State of Iowa over the past several years, their actual impact in terms of traffic safety has not been quantified. This study seeks answers to the following questions: (a) Are bypasses in Iowa associated with a reduction in crash frequencies and crash rates on the bypassed highway? (b) Do bypasses in Iowa introduce a reduction of overall crash frequencies and rates or do they merely shift crashes from the highways through the communities to the bypasses with no significant overall reduction? We obtained crash information from the Iowa DOT at 19 sites on which a bypass was constructed sometime during the past 23 years. We also obtained the same information at six sites used as comparison sites on which no bypasses were constructed at least until 2005. We them employed a Bayesian approach to estimating the association between the construction of the bypass and crash rates, while also accounting for other factors. The construction of bypasses in Iowa is associated with a significant increase in traffic safety both on the main road through town and on the combined main road and bypass roadway. Copyright © 2011 National Safety Council and Elsevier Ltd. All rights reserved.

  19. Effect of Attitudinal, Situational and Demographic Factors on Annoyance Due to Environmental Vibration and Noise from Construction of a Light Rapid Transit System.

    PubMed

    Wong-McSweeney, Daniel; Woodcock, James; Waddington, David; Peris, Eulalia; Koziel, Zbigniew; Moorhouse, Andy; Redel-Macías, María Dolores

    2016-12-14

    The aim of this paper is to determine what non-exposure factors influence the relationship between vibration and noise exposure from the construction of a Light Rapid Transit (LRT) system and the annoyance of nearby residents. Noise and vibration from construction sites are known to annoy residents, with annoyance increasing as a function of the magnitude of the vibration and noise. There is not a strong correlation between exposure and levels of annoyance suggesting that factors not directly related to the exposure may have an influence. A range of attitudinal, situational and demographic factors are investigated with the aim of understanding the wide variation in annoyance for a given vibration exposure. A face-to-face survey of residents ( n = 350) near three sites of LRT construction was conducted, and responses were compared to semi-empirical estimates of the internal vibration within the buildings. It was found that annoyance responses due to vibration were strongly influenced by two attitudinal variables, concern about property damage and sensitivity to vibration. Age, ownership of the property and the visibility of the construction site were also important factors. Gender, time at home and expectation of future levels of vibration had much less influence. Due to the measurement methods used, it was not possible to separate out the effects of noise and vibration on annoyance; as such, this paper focusses on annoyance due to vibration exposure. This work concludes that for the most cost-effective reduction of the impact of construction vibration and noise on the annoyance felt by a community, policies should consider attitudinal factors.

  20. Effect of Attitudinal, Situational and Demographic Factors on Annoyance Due to Environmental Vibration and Noise from Construction of a Light Rapid Transit System

    PubMed Central

    Wong-McSweeney, Daniel; Woodcock, James; Waddington, David; Peris, Eulalia; Koziel, Zbigniew; Moorhouse, Andy; Redel-Macías, María Dolores

    2016-01-01

    The aim of this paper is to determine what non-exposure factors influence the relationship between vibration and noise exposure from the construction of a Light Rapid Transit (LRT) system and the annoyance of nearby residents. Noise and vibration from construction sites are known to annoy residents, with annoyance increasing as a function of the magnitude of the vibration and noise. There is not a strong correlation between exposure and levels of annoyance suggesting that factors not directly related to the exposure may have an influence. A range of attitudinal, situational and demographic factors are investigated with the aim of understanding the wide variation in annoyance for a given vibration exposure. A face-to-face survey of residents (n = 350) near three sites of LRT construction was conducted, and responses were compared to semi-empirical estimates of the internal vibration within the buildings. It was found that annoyance responses due to vibration were strongly influenced by two attitudinal variables, concern about property damage and sensitivity to vibration. Age, ownership of the property and the visibility of the construction site were also important factors. Gender, time at home and expectation of future levels of vibration had much less influence. Due to the measurement methods used, it was not possible to separate out the effects of noise and vibration on annoyance; as such, this paper focusses on annoyance due to vibration exposure. This work concludes that for the most cost-effective reduction of the impact of construction vibration and noise on the annoyance felt by a community, policies should consider attitudinal factors. PMID:27983662

  1. Constructing Optimal Coarse-Grained Sites of Huge Biomolecules by Fluctuation Maximization.

    PubMed

    Li, Min; Zhang, John Zenghui; Xia, Fei

    2016-04-12

    Coarse-grained (CG) models are valuable tools for the study of functions of large biomolecules on large length and time scales. The definition of CG representations for huge biomolecules is always a formidable challenge. In this work, we propose a new method called fluctuation maximization coarse-graining (FM-CG) to construct the CG sites of biomolecules. The defined residual in FM-CG converges to a maximal value as the number of CG sites increases, allowing an optimal CG model to be rigorously defined on the basis of the maximum. More importantly, we developed a robust algorithm called stepwise local iterative optimization (SLIO) to accelerate the process of coarse-graining large biomolecules. By means of the efficient SLIO algorithm, the computational cost of coarse-graining large biomolecules is reduced to within the time scale of seconds, which is far lower than that of conventional simulated annealing. The coarse-graining of two huge systems, chaperonin GroEL and lengsin, indicates that our new methods can coarse-grain huge biomolecular systems with up to 10,000 residues within the time scale of minutes. The further parametrization of CG sites derived from FM-CG allows us to construct the corresponding CG models for studies of the functions of huge biomolecular systems.

  2. Quantification of VOC emissions from paint spraying on a construction site using solid phase microextraction devices.

    PubMed

    Cheng, Wen-Hsi; Huang, Hsiao-Lin; Chen, Kang-Shin; Chang, Yu-Jen

    2017-10-15

    The objective of this study was to measure the emission of, and personal exposure to workers, volatile organic compound (VOC) during paint spraying on a construction site. Needle trap samplers (NTSs), which are a green solid phase microextraction sampling technology, were used to obtain air samples at a large music exhibition center. The standard active sampling method using charcoal tubes and a personal air pump, Method 1501, was simultaneously utilized at the sampling sites to assess the workers' VOC exposures. Analysis of the data thus obtained showed that benzene, toluene, ethylenebenzene, and xylenes (BTEXs) were the main emission compounds. Acetone and isobutyl alcohol, which are used as thinning solvents, were detected as minor emission compounds. The emitted concentrations of most compounds were lower than the legal emission limits in Taiwan except that of benzene, for which the 2-ppm time weighted average short-term exposure limit was exceeded. The packed divinylbenzene (DVB) in the NTS was observed under an environmental scanning electron microscope, and many fine aerosols were found to be deposited on the surface of the DVB adsorbents, causing VOC extraction efficiencies after the fifth sampling in the field to decline. Workers on construction sites should be protected from emissions of VOC and fine particulates to preserve their occupational health.

  3. Targeting the lymphatics using dendritic polymers (dendrimers).

    PubMed

    Kaminskas, Lisa M; Porter, Christopher J H

    2011-09-10

    Dendrimers are unique biomaterials that are constructed by the stepwise addition of layers (generations) of polymer around a central core. They can be constructed with a range of molecular weights and have a polyfunctional surface that facilitates the attachment of drugs and pharmacokinetic modifiers such PEG or targeting moieties. These properties have led to considerable interest in the development of dendrimers for a range of biomedical applications. After subcutaneous administration, larger dendrimers in particular (> 8 nm), preferentially drain from the injection site into the peripheral lymphatic capillaries and therefore have potential as lymphatic imaging agents for magnetic resonance and optical fluorescence lymphangiography and as vectors for drug-targeting to lymphatic sites of disease progression. In general, lymphatic targeting of dendrimers is enhanced by increasing size although ultimately larger constructs may be incompletely absorbed from the injection site. Increasing hydrophilicity and reducing surface charge enhances drainage from subcutaneous injection sites, but the reverse is true of uptake into lymph nodes where charge and hydrophobicity promote retention. Larger hydrophilic dendrimers are also capable of extravasation from the systemic circulation, absorption into the lymphatic system and recirculation into the blood. Lymphatic recirculation may therefore be a characteristic of PEGylated dendrimers with long systemic circulation times. Copyright © 2011 Elsevier B.V. All rights reserved.

  4. Basic repository environmental assessment design basis, Lavender Canyon site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Paradox Basin in Lavender Canyon, Utah. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling andmore » packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $5.51 billion. Costs include those for the collocated WHPP, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively sound nature of the salt at this site. Construction would require an estimated 7.75 years. Engineering factors and costs are not strongly influenced by environmental considerations. 51 refs., 24 figs., 20 tabs.« less

  5. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    PubMed

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  6. Cancer Research Center Indiana University School of Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less

  7. Site characterization and construction of a controlled shallow test site in central Mexico for archaeological and engineering applications

    NASA Astrophysics Data System (ADS)

    Rosado-Fuentes, A.; Arango-Galvan, C.; Arciniega-Ceballos, A.; Hernández-Quintero, J. E.; Mendo-Perez, G.

    2017-12-01

    A controlled shallow test site (CSTS) has been constructed at the UNAM Geomagnetic Observatory in Teoloyucan, central Mexico. The objective of the CSTS is to have a controlled place to test new developments and arrays that can be used for archaeological and engineering exploration, as well as to calibrate instruments, train students and for future research. The CSTS was built far enough not to influence the geomagnetic sensors and not be affected by noise sources. Special attention was given to the distribution and geometry of buried materials as well as the instruments used. Before the CSTS was built, a combination of near-surface, non-invasive geophysical techniques was performed to characterize the area of 20 by 32 meters. The methods include magnetometry, electromagnetic induction, ground penetrating radar (GPR), electrical resistivity tomography (ERT) and seismic refraction tomography (SRT). The GPR, SRT and ERT results show relatively flat interfaces. In general, the vertical gradient of the total magnetic field and the electric conductivity have very small variations, showing only one strong magnetic dipole associated to a shallow anomaly. These results indicate that the area is ideal for the construction of the test site. The CSTS consists on buried structures made with different materials and geometries (cubes, cylinders and tubes) commonly used as construction materials in Mexico since Pre-Hispanic times. These materials include concrete, reinforced concrete, wood, brick, adobe, basalt, tezontle and also empty space for controlling responses. The CSTS is versatile enough to be reshaped considering new geometries or materials and to conduct further investigations.

  8. Comparison of PM10 concentrations and metal content in three different sites of the Venice Lagoon: an analysis of possible aerosol sources.

    PubMed

    Contini, Daniele; Belosi, Franco; Gambaro, Andrea; Cesari, Daniela; Stortini, Angela Maria; Bove, Maria Chiara

    2012-01-01

    The Venice Lagoon is exposed to atmospheric pollutants from industrial activities, thermoelectric power plants, petrochemical plants, incinerator, domestic heating, ship traffic, glass factories and vehicular emissions on the mainland. In 2005, construction began on the mobile dams (MOSE), one dam for each channel connecting the lagoon to the Adriatic Sea as a barrier against high tide. These construction works could represent an additional source of pollutants. PM10 samples were taken on random days between 2007 and 2010 at three different sites: Punta Sabbioni, Chioggia and Malamocco, located near the respective dam construction worksites. Chemical analyses of V, Cr, Fe, Co, Ni, Cu, Zn, As, Mo, Cd, Sb, Tl and Pb in PM10 samples were performed by Inductively coupled plasma-quadrupole mass spectrometry (ICP-QMS) and results were used to identify the main aerosol sources. The correlation of measured data with meteorology, and source apportionment, failed to highlight a contribution specifically associated to the emissions of the MOSE construction works. The comparison of the measurements at the three sites showed a substantial homogeneity of metal concentrations in the area. Source apportionment with principal component analysis (PCA) and positive matrix factorization (PMF) showed that a four principal factors model could describe the sources of metals in PM10. Three of them were assigned to specific sources in the area and one was characterised as a source of mixed origin (anthropogenic and crustal). A specific anthropogenic source of PM10 rich in Ni and Cr, active at the Chioggia site, was also identified.

  9. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  10. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  11. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  12. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  13. Black Womanhood and Feminist Standpoints.

    ERIC Educational Resources Information Center

    Allen, Brenda J.

    1998-01-01

    Discusses challenges and consequences of being a member of two historically oppressed groups in the United States--Blacks and females. Relies on feminist standpoint theory--a distinctive element of contemporary feminist thought about how knowledge is constructed. Focuses on academe as a discursive site for constructing identity. (PA)

  14. COMPATIBILITY OF NAPLS AND OTHER ORGANIC COMPOUNDS WITH MATERIALS UED IN WELL CONSTRUCTION, SAMPLING, AND REMEDIATION

    EPA Science Inventory

    Structural integrity of well construction, sampling, and remediation materials may be compromised at many hazardous sites by nonaqueous phase liquids (NAPLs) and their dissolved constituents. A literature review of compatibility theory and qualitative field experiences are provid...

  15. EMISSION MEASUREMENTS OF PARTICLE MASS AND SIZE EMISSION PROFILES FROM CONSTRUCTION ACTIVITIES

    EPA Science Inventory

    The report gives results from field tests that characterize the amount and size distribution of particulate matter (PM) emissions from operations at construction sites. Of particular interest is the movement of earth by scraper loading and unloading, grading, transit vehicular m...

  16. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  17. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  18. Development of a safety communication and recognition program for construction.

    PubMed

    Sparer, Emily H; Herrick, Robert F; Dennerlein, Jack T

    2015-05-01

    Leading-indicator-based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator-based (e.g., injury rates) programs. We designed a leading-indicator-based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  19. Pyramiding tumuli waste disposal site and method of construction thereof

    DOEpatents

    Golden, Martin P.

    1989-01-01

    An improved waste disposal site for the above-ground disposal of low-level nuclear waste as disclosed herein. The disposal site is formed from at least three individual waste-containing tumuli, wherein each tumuli includes a central raised portion bordered by a sloping side portion. Two of the tumuli are constructed at ground level with adjoining side portions, and a third above-ground tumulus is constructed over the mutually adjoining side portions of the ground-level tumuli. Both the floor and the roof of each tumulus includes a layer of water-shedding material such as compacted clay, and the clay layer in the roofs of the two ground-level tumuli form the compacted clay layer of the floor of the third above-ground tumulus. Each tumulus further includes a shield wall, preferably formed from a solid array of low-level handleable nuclear wate packages. The provision of such a shield wall protects workers from potentially harmful radiation when higher-level, non-handleable packages of nuclear waste are stacked in the center of the tumulus.

  20. A New Blondin System for Surveying and Photogrammetry

    PubMed Central

    Cuesta, Federico; Lopez-Rodriguez, Francisco M.; Esteban, Antonio

    2013-01-01

    The main objective of the system presented in this paper is to provide surveyors and engineers with a new photogrammetry device that can be easily integrated with surveying total stations and a global navigation satellite system (GNSS) infrastructure at a construction site, taking advantage of their accuracy and overcoming limitations of aerial vehicles with respect to weight, autonomy and skilled operator requirements in aerial photogrammetry. The system moves between two mounting points, in a blondin ropeway configuration, at the construction site, taking pictures and recording the data of the position and the orientation along the cable path. A cascaded extended Kalman filter is used to integrate measurements from the on-board inertial measurement unit (IMU), a GPS and a GNSS. Experimental results taken in a construction site show the system performance, including the validation of the position estimation, with a robotic surveying total station, or the creation of a digital surface model (DSM), using the emergent structure from motion (SfM) techniques and open software. The georeferencing of the DSM is performed based on estimated camera position or using ground control points (GCPs).

  1. Contributing factors in construction accidents.

    PubMed

    Haslam, R A; Hide, S A; Gibb, A G F; Gyi, D E; Pavitt, T; Atkinson, S; Duff, A R

    2005-07-01

    This overview paper draws together findings from previous focus group research and studies of 100 individual construction accidents. Pursuing issues raised by the focus groups, the accident studies collected qualitative information on the circumstances of each incident and the causal influences involved. Site based data collection entailed interviews with accident-involved personnel and their supervisor or manager, inspection of the accident location, and review of appropriate documentation. Relevant issues from the site investigations were then followed up with off-site stakeholders, including designers, manufacturers and suppliers. Levels of involvement of key factors in the accidents were: problems arising from workers or the work team (70% of accidents), workplace issues (49%), shortcomings with equipment (including PPE) (56%), problems with suitability and condition of materials (27%), and deficiencies with risk management (84%). Employing an ergonomics systems approach, a model is proposed, indicating the manner in which originating managerial, design and cultural factors shape the circumstances found in the work place, giving rise to the acts and conditions which, in turn, lead to accidents. It is argued that attention to the originating influences will be necessary for sustained improvement in construction safety to be achieved.

  2. Interpretation of electrical resistivity data acquired at the Aurora plant site

    DOT National Transportation Integrated Search

    2008-02-01

    MST proposes to acquire high-resolution reflection seismic data at the Knight Hawk Coal Company construction site. These geophysical data will be processed, analyzed and interpreted with the objective of locating and mapping any subsurface voids that...

  3. Compressed-air energy-storage preliminary design and site-development program in an aquifer. Volume 9: Cost estimate and schedule

    NASA Astrophysics Data System (ADS)

    1982-12-01

    The behavior and suitability of aquifers as compressed-air energy-storage sites is discussed. The engineering and construction schedule, facilities capital-cost estimate, and corresponding cash-flow requirements are given.

  4. 7 CFR 1924.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.101 Purpose. This subpart establishes the basic Rural Housing Service (RHS) policies for planning and performing site development work...

  5. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  6. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  7. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  8. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. L. Poe, Jr.; P.F. Wise

    The U.S. Department of Energy (DOE) is preparing a proposal to construct, operate 2nd monitor, and eventually close a repository at Yucca Mountain in Nye County, Nevada, for the geologic disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). As part of this effort, DOE has prepared a viability assessment and an assessment of potential consequences that may exist if the repository is not constructed. The assessment of potential consequences if the repository is not constructed assumes that all SNF and HLW would be left at the generator sites. These include 72 commercial generator sites (three commercial facilitymore » pairs--Salem and Hope Creek, Fitzpatrick and Nine Mile Point, and Dresden and Morris--would share common storage due to their close proximity to each other) and five DOE sites across the country. DOE analyzed the environmental consequences of the effects of the continued storage of these materials at these sites in a report titled Continued Storage Analysis Report (CSAR; Reference 1 ) . The CSAR analysis includes a discussion of the degradation of these materials when exposed to the environment. This document describes the environmental parameters that influence the degradation analyzed in the CSAR. These include temperature, relative humidity, precipitation chemistry (pH and chemical composition), annual precipitation rates, annual number of rain-days, and annual freeze/thaw cycles. The document also tabulates weather conditions for each storage site, evaluates the degradation of concrete storage modules and vaults in different regions of the country, and provides a thermal analysis of commercial SNF in storage.« less

  10. Research Progress of Building Materials Used in Construction Land

    NASA Astrophysics Data System (ADS)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  11. Face, content, and construct validity of four, inanimate training exercises using the da Vinci ® Si surgical system configured with Single-Site ™ instrumentation.

    PubMed

    Jarc, Anthony M; Curet, Myriam

    2015-08-01

    Validated training exercises are essential tools for surgeons as they develop technical skills to use robot-assisted minimally invasive surgical systems. The purpose of this study was to show face, content, and construct validity of four, inanimate training exercises using the da Vinci (®) Si surgical system configured with Single-Site (™) instrumentation. New (N = 21) and experienced (N = 6) surgeons participated in the study. New surgeons (11 Gynecology [GYN] and 10 General Surgery [GEN]) had not completed any da Vinci Single-Site cases but may have completed multiport cases using the da Vinci system. They participated in this study prior to attending a certification course focused on da Vinci Single-Site instrumentation. Experienced surgeons (5 GYN and 1 GEN) had completed at least 25 da Vinci Single-Site cases. The surgeons completed four inanimate training exercises and then rated them with a questionnaire. Raw metrics and overall normalized scores were computed using both video recordings and kinematic data collected from the surgical system. The experienced surgeons significantly outperformed new surgeons for many raw metrics and the overall normalized scores derived from video review (p < 0.05). Only one exercise did not achieve a significant difference between new and experienced surgeons (p = 0.08) when calculating an overall normalized score using both video and advanced metrics derived from kinematic data. Both new and experienced surgeons rated the training exercises as appearing, to train and measure technical skills used during da Vinci Single-Site surgery and actually testing the technical skills used during da Vinci Single-Site surgery. In summary, the four training exercises showed face, content, and construct validity. Improved overall scores could be developed using additional metrics not included in this study. The results suggest that the training exercises could be used in an overall training curriculum aimed at developing proficiency in technical skills for surgeons new to da Vinci Single-Site instrumentation.

  12. Development of concepts for low-cost energy storage assemblies for annual cycle energy system applications

    NASA Astrophysics Data System (ADS)

    Alexander, G. H.; Cooper, D. L.; Cummings, C. A.; Reiber, E. E.

    1981-10-01

    Low cost energy storage assemblies were developed. In the search for low overall cost assemblies, many diverse concepts and materials were postulated and briefly evaluated. Cost rankings, descriptions, and discussions of the concepts were presented from which ORNL selected the following three concepts for the Phase 2 development: (1) a site constructed tank with reinforced concrete walls formed with specialized modular blocks which eliminates most concrete form work and provides integral R-20 insulation designated ORNLFF; (2) a site constructed tank with earth supported walls that are formed from elements common to residential, in-ground swimming pools, designated SWPL; (3) and a site assembled tank used in underground utility vaults, designated UTLBX. Detailed designs of free standing versions of the three concepts are presented.

  13. Production patterns of packaging waste categories generated at typical Mediterranean residential building worksites.

    PubMed

    González Pericot, N; Villoria Sáez, P; Del Río Merino, M; Liébana Carrasco, O

    2014-11-01

    The construction sector is responsible for around 28% of the total waste volume generated in Europe, which exceeds the amount of household waste. This has led to an increase of different research studies focusing on construction waste quantification. However, within the research studies made, packaging waste has been analyzed to a limited extent. This article focuses on the packaging waste stream generated in the construction sector. To this purpose current on-site waste packaging management has been assessed by monitoring ten Mediterranean residential building works. The findings of the experimental data collection revealed that the incentive measures implemented by the construction company to improve on-site waste sorting failed to achieve the intended purpose, showing low segregation ratios. Subsequently, through an analytical study the generation patterns for packaging waste are established, leading to the identification of the prevailing kinds of packaging and the products responsible for their generation. Results indicate that plastic waste generation maintains a constant trend throughout the whole construction process, while cardboard becomes predominant towards the end of the construction works with switches and sockets from the electricity stage. Understanding the production patterns of packaging waste will be beneficial for adapting waste management strategies to the identified patterns for the specific nature of packaging waste within the context of construction worksites. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. A methodology to quantitatively evaluate the safety of a glazing robot.

    PubMed

    Lee, Seungyeol; Yu, Seungnam; Choi, Junho; Han, Changsoo

    2011-03-01

    A new construction method using robots is spreading widely among construction sites in order to overcome labour shortages and frequent construction accidents. Along with economical efficiency, safety is a very important factor for evaluating the use of construction robots in construction sites. However, the quantitative evaluation of safety is difficult compared with that of economical efficiency. In this study, we suggested a safety evaluation methodology by defining the 'worker' and 'work conditions' as two risk factors, defining the 'worker' factor as posture load and the 'work conditions' factor as the work environment and the risk exposure time. The posture load evaluation reflects the risk of musculoskeletal disorders which can be caused by work posture and the risk of accidents which can be caused by reduced concentration. We evaluated the risk factors that may cause various accidents such as falling, colliding, capsizing, and squeezing in work environments, and evaluated the operational risk by considering worker exposure time to risky work environments. With the results of the evaluations for each factor, we calculated the general operational risk and deduced the improvement ratio in operational safety by introducing a construction robot. To verify these results, we compared the safety of the existing human manual labour and the proposed robotic labour construction methods for manipulating large glass panels. Copyright © 2010 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  15. "A Place of Their Own": Creating a Classroom "Third Space" to Support a Continuum of Text Construction between Home and School

    ERIC Educational Resources Information Center

    Cook, Margaret

    2005-01-01

    This paper uses aspects of "third space" theory to support the use of site-based classroom role play as a means of ensuring continuity of text construction between home and school. A hypothetical continuum of text construction between home and school is described, and it is suggested that schools wishing to support this continuum might consider…

  16. 1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.

    DTIC Science & Technology

    1981-02-02

    7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of

  17. Nuclear gauge application in road industry

    NASA Astrophysics Data System (ADS)

    Azmi Ismail, Mohd

    2017-11-01

    Soil compaction is essential in road construction. The evaluation of the degree of compaction relies on the knowledge of density and moisture of the compacted layers is very important to the performance of the pavement structure. Among the various tests used for making these determinations, the sand replacement density test and the moisture content determination by oven drying are perhaps the most widely used. However, these methods are not only time consuming and need wearisome procedures to obtain the results but also destructive and the number of measurements that can be taken at any time is limited. The test can on be fed back to the construction site the next day. To solve these problems, a nuclear technique has been introduced as a quicker and easier way of measuring the density and moisture of construction materials. Nuclear moisture density gauges have been used for many years in pavement construction as a method of non-destructive density testing The technique which can determine both wet density and moisture content offers an in situ method for construction control at the work site. The simplicity, the speed, and non-destructive nature offer a great advantage for quality control. This paper provides an overview of nuclear gauge application in road construction and presents a case study of monitoring compaction status of in Sedenak - Skudai, Johor rehabilitation projects.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  19. 77 FR 37707 - Draft Environmental Impact Statement on Brooks River Visitor Access for Katmai National Park and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... floating bridge and sites to relocate the existing Naknek Lake barge landing area at the mouth of the... landing site on Naknek Lake. Alternative 3: This alternative evaluates construction of a new bridge and... barge landing site would be located approximately 200 feet south of the mouth of the Brooks River. A new...

  20. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    DTIC Science & Technology

    2012-05-22

    Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on

Top