Sample records for construction work in progress

  1. 17 CFR 256.107 - Construction work in progress.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Construction work in progress... Construction work in progress. This account shall include the total of the balances of work orders for service company property in process of construction. Work orders shall be cleared from this account as soon as...

  2. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  3. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE... NATURAL GAS ACT Balance Sheet Chart of Accounts § 367.1070 Account 107, Construction work in progress. (a... research, development, and demonstration projects for construction of facilities are to be included in a...

  4. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act... should make prompt progress payment to subcontractors and suppliers for eligible construction, material... under a contract under an EPA construction grant. (b) Conditions of progress payments. For purposes of...

  5. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 107, Construction work in progress. 367.1070 Section 367.1070 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  6. The combined use of Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies for the 3D illustration of the progress of works in infrastructure construction projects

    NASA Astrophysics Data System (ADS)

    Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos

    2016-08-01

    Building Information Modelling (BIM) technology is already part of the construction industry and is considered by professionals as a very useful tool for all phases of a construction project. BIM technology, with the particularly useful 3D illustrations which it provides, can be used to illustrate and monitor the progress of works effectively through the entire lifetime of the project. Unmanned Aerial Vehicles (UAVs) have undergone significant advances in equipment capabilities and now have the capacity to acquire high resolution imagery from different angles in a cost effective and efficient manner. By using photogrammetry, characteristics such as distances, areas, volumes, elevations, object sizes, and object shape can be determined within overlapping areas. This paper explores the combined use of BIM and UAV technologies in order to achieve efficient and accurate as-built data collection and 3D illustrations of the works progress during an infrastructure construction project.

  7. Shale embankment construction criteria : experimental feature interim report.

    DOT National Transportation Integrated Search

    1985-06-01

    The research was conducted in the summer of 1983 during the realignment construction of the Mystic Creek - Camas Valley section on the Coos Bay - Roseburg Highway. Construction is still in progress. As outlined in the experimental features work plan ...

  8. 25 CFR 1000.244 - May the Secretary suspend construction activities under an AFA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... construction activities under an AFA? (a) The Secretary may require a Tribe/Consortium to suspend certain work under a construction portion of an AFA for up to 30 days only if: (1) Site conditions adversely affect health and safety; or (2) Work in progress or completed fails to substantially carry out the terms of the...

  9. Measuring Progressions: Assessment Structures Underlying a Learning Progression

    ERIC Educational Resources Information Center

    Wilson, Mark

    2009-01-01

    This article describes some of the underlying conceptualizations that have gone into the work of the BEAR Center in the development of learning progressions. The core of all of these developments has been the construct map, which is the first building block in the BEAR Assessment System (BAS). After introducing the concept of a learning…

  10. Development of a group work assessment pedagogy using constructive alignment theory.

    PubMed

    Croy, Suzanne R

    2018-02-01

    The purpose of this paper is to explore group work assessment underpinned by constructive alignment theory to develop a new assessment pedagogy. A review was undertaken of an existing module 'Mental Health Nursing 1', with student nurses participating in the BSc (Hons) Nursing Programme. Constructive alignment theory requires teachers to adopt a deep approach to learning where module learning outcomes are aligned with the teaching environment and modes of assessment. As the module progressed, reviewing the Mental Health Nursing 1 module became an excellent opportunity to begin to understand how constructive alignment theory can inform a group work assessment pedagogy. Working using a constructively aligned assessment process became a valuable learning experience for the module leader whilst at the same time revealed a gap in the research around the impact of constructively aligned teaching and group work assessment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Progressively engaging: constructing nurse, patient, and family relationships in acute care settings.

    PubMed

    Segaric, Cheryl Ann; Hall, Wendy A

    2015-02-01

    In this grounded theory study, informed by symbolic interactionism, we explain how nurses, patients, and family members construct relationships in acute care settings, including managing effects of work environments. We recruited participants from 10 acute care units across four community hospitals in a Western Canadian city. From 33 hr of participant observation and 40 interviews with 13 nurses, 17 patients, and 10 family members, we constructed the basic social-psychological process of progressively engaging. Nurses, patients, and family members approached constructing relationships through levels of engagement, ranging from perspectives about "just doing the job" to "doing the job with heart." Progressively engaging involved three stages: focusing on tasks, getting acquainted, and building rapport. Workplace conditions and personal factors contributed or detracted from participants' movement through the stages of the process; with higher levels of engagement, participants experienced greater satisfaction and cooperation. Progressively engaging provides direction for how all participants in care can invest in relationships. © The Author(s) 2014.

  12. 29 CFR 1926.600 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Motor Vehicles, Mechanized Equipment, and Marine..., adjacent to a highway in normal use, or adjacent to construction areas where work is in progress, shall...

  13. Empirical Validation of a Modern Genetics Progression Web for College Biology Students

    ERIC Educational Resources Information Center

    Todd, Amber; Romine, William L.

    2017-01-01

    Research in learning progressions (LPs) has been essential towards building understanding of how students' ideas change over time. There has been little work, however, into how ideas between separate but related constructs within a multi-faceted LP relate. The purpose of this paper is to elaborate on the idea of "progression webs" to…

  14. Mathematical Working Spaces through Networking Lens

    ERIC Educational Resources Information Center

    Artigue, Michèle

    2016-01-01

    This issue of "ZDM" collects research works sharing a common reference to the theoretical framework of Mathematical Working Spaces (MWS), a construction which emerged about one decade ago, and has progressively found its way in the mathematics education community, thanks to the collaborative work of an international group of researchers.…

  15. 18. Photocopy of Photograph (From Bethlehem Shipbuilding Ltd., New York, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of Photograph (From Bethlehem Shipbuilding Ltd., New York, New York, 1919) C.1918 PHOTOGRAPH OF CONSTRUCTION WORK IN PROGRESS WITH MACHINE SHOP IN BACKGROUND - Union Iron Works Turbine Machine Shop, 2200 Webster Street, Alameda, Alameda County, CA

  16. 23 CFR 635.122 - Participation in progress payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Federal funds will participate in the costs to the STD of construction accomplished as the work progresses... receiving payment from the STD; and (3) The quantity of a stockpiled material eligible for Federal... the contractor at a location not in the vicinity of the project, if the STD determines that because of...

  17. 23 CFR 635.122 - Participation in progress payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Federal funds will participate in the costs to the STD of construction accomplished as the work progresses... receiving payment from the STD; and (3) The quantity of a stockpiled material eligible for Federal... the contractor at a location not in the vicinity of the project, if the STD determines that because of...

  18. 23 CFR 635.122 - Participation in progress payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Federal funds will participate in the costs to the STD of construction accomplished as the work progresses... receiving payment from the STD; and (3) The quantity of a stockpiled material eligible for Federal... the contractor at a location not in the vicinity of the project, if the STD determines that because of...

  19. 23 CFR 635.122 - Participation in progress payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Federal funds will participate in the costs to the STD of construction accomplished as the work progresses... receiving payment from the STD; and (3) The quantity of a stockpiled material eligible for Federal... the contractor at a location not in the vicinity of the project, if the STD determines that because of...

  20. The Incremental Launching Method for Educational Virtual Model

    NASA Astrophysics Data System (ADS)

    Martins, Octávio; Sampaio, A. Z.

    This paper describes the application of virtual reality technology to the development of an educational model related to the construction of a bridge. The model allow the visualization of the physical progression of the work following a planned construction sequence, the observation of details of the form of every component of the works and carry the study of the type and method of operation of the equipment applied in the construction. The model admit interaction and then some degree of collaboration between students and teachers in the analyses of aspects concerning geometric forms, working methodology or other technical issues observed using the application. The model presents distinct advantage as educational aids in first-degree courses in Civil Engineering.

  1. Construction Strategy and Progress of Whole Intervertebral Disc Tissue Engineering.

    PubMed

    Yang, Qiang; Xu, Hai-wei; Hurday, Sookesh; Xu, Bao-shan

    2016-02-01

    Degenerative disc disease (DDD) is the major cause of low back pain, which usually leads to work absenteeism, medical visits and hospitalization. Because the current conservative procedures and surgical approaches to treatment of DDD only aim to relieve the symptoms of disease but not to regenerate the diseased disc, their long-term efficiency is limited. With the rapid developments in medical science, tissue engineering techniques have progressed markedly in recent years, providing a novel regenerative strategy for managing intervertebral disc disease. However, there are as yet no ideal methods for constructing tissue-engineered intervertebral discs. This paper reviews published reports pertaining to intervertebral disc tissue engineering and summarizes data concerning the seed cells and scaffold materials for tissue-engineered intervertebral discs, construction of tissue-engineered whole intervertebral discs, relevant animal experiments and effects of mechanics on the construction of tissue-engineered intervertebral disc and outlines the existing problems and future directions. Although the perfect regenerative strategy for treating DDD has not yet been developed, great progress has been achieved in the construction of tissue-engineered intervertebral discs. It is believed that ongoing research on intervertebral disc tissue engineering will result in revolutionary progress in the treatment of DDD. © 2016 Chinese Orthopaedic Association and John Wiley & Sons Australia, Ltd.

  2. A Learning Progression for Scientific Argumentation: Understanding Student Work and Designing Supportive Instructional Contexts

    ERIC Educational Resources Information Center

    Berland, Leema K.; McNeill, Katherine L.

    2010-01-01

    Argumentation is a central goal of science education because it engages students in a complex scientific practice in which they construct and justify knowledge claims. Although there is a growing body of research around argumentation, there has been little focus on developing a learning progression for this practice. We describe a learning…

  3. Work Papers of the Summer Institute of Linguistics, University of North Dakota Session. Volume 35.

    ERIC Educational Resources Information Center

    Dooley, Robert A., Ed.; Quakenbush, J. Stephen, Ed.

    The working papers by students and professors of linguistics on research in progress include the following: "Are Cariban Languages Moving Away From or Towards Ergative Systems?" (Desmond D. Derbyshire); "A Double-Verb Construction in Mbya Guarani" (Robert A. Dooley); "Semantically Ergative Languages in Typological…

  4. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    NASA Astrophysics Data System (ADS)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  5. InPRO: Automated Indoor Construction Progress Monitoring Using Unmanned Aerial Vehicles

    NASA Astrophysics Data System (ADS)

    Hamledari, Hesam

    In this research, an envisioned automated intelligent robotic solution for automated indoor data collection and inspection that employs a series of unmanned aerial vehicles (UAV), entitled "InPRO", is presented. InPRO consists of four stages, namely: 1) automated path planning; 2) autonomous UAV-based indoor inspection; 3) automated computer vision-based assessment of progress; and, 4) automated updating of 4D building information models (BIM). The works presented in this thesis address the third stage of InPRO. A series of computer vision-based methods that automate the assessment of construction progress using images captured at indoor sites are introduced. The proposed methods employ computer vision and machine learning techniques to detect the components of under-construction indoor partitions. In particular, framing (studs), insulation, electrical outlets, and different states of drywall sheets (installing, plastering, and painting) are automatically detected using digital images. High accuracy rates, real-time performance, and operation without a priori information are indicators of the methods' promising performance.

  6. [Purveyors of technology: provincial engineers and the construction of road infrastructure in Minas Gerais].

    PubMed

    Barbosa, Lidiany Silva

    2011-01-01

    The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.

  7. Frustrated with the Pace of Progress in Education? Invest in Better Evidence

    ERIC Educational Resources Information Center

    Kane, Thomas J.

    2015-01-01

    The primary obstacle to faster progress in U.S. education reform is hard to put your finger on, because it's an absence, not a presence. It is not an interest group or a manifest social problem. It is the infrastructure we never built for identifying what works. It is the organizational framework we've not yet constructed for building consensus…

  8. [Strategic thinking of the construction of national schistosomiasis laboratory network in China].

    PubMed

    Qin, Zhi-Qiang; Xu, Jing; Feng, Ting; Zhu, Hong-Qing; Li, Shi-Zhu; Xiao, Ning; Zhou, Xiao-Nong

    2013-08-01

    A schistosomiasis laboratory network and its quality assurance system have been built and will be more and more perfect in China. This paper introduces the present situation of schistosomiasis diagnosis in China and expounds the basic ideas and the progress in the construction of schistosomiasis network platform. Furthermore, the face of schistosomiasis diagnosis network platform construction and operation of the challenge and the future work will be put forward in the latter part of this paper.

  9. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  10. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  11. A Functional High-Throughput Assay of Myelination in Vitro

    DTIC Science & Technology

    2013-07-01

    feasibility of developing microengineered human neural tissues that can be assessed non-invasively. A population of neurons has been derived from human...physiological responses in microengineered tissue constructs has been demonstrated. This works represents a unique combination of enabling...and recording from microengineered tissues. All progress and results discussed in this report are in regard to the revised Statement of Work

  12. Recent Progress on Systems and Synthetic Biology Approaches to Engineer Fungi As Microbial Cell Factories.

    PubMed

    Amores, Gerardo Ruiz; Guazzaroni, María-Eugenia; Arruda, Letícia Magalhães; Silva-Rocha, Rafael

    2016-04-01

    Filamentous fungi are remarkable organisms naturally specialized in deconstructing plant biomass and this feature has a tremendous potential for biofuel production from renewable sources. The past decades have been marked by a remarkable progress in the genetic engineering of fungi to generate industry-compatible strains needed for some biotech applications. In this sense, progress in this field has been marked by the utilization of high-throughput techniques to gain deep understanding of the molecular machinery controlling the physiology of these organisms, starting thus the Systems Biology era of fungi. Additionally, genetic engineering has been extensively applied to modify wellcharacterized promoters in order to construct new expression systems with enhanced performance under the conditions of interest. In this review, we discuss some aspects related to significant progress in the understating and engineering of fungi for biotechnological applications, with special focus on the construction of synthetic promoters and circuits in organisms relevant for industry. Different engineering approaches are shown, and their potential and limitations for the construction of complex synthetic circuits in these organisms are examined. Finally, we discuss the impact of engineered promoter architecture in the single-cell behavior of the system, an often-neglected relationship with a tremendous impact in the final performance of the process of interest. We expect to provide here some new directions to drive future research directed to the construction of high-performance, engineered fungal strains working as microbial cell factories.

  13. Thematic Teaching in Action

    ERIC Educational Resources Information Center

    Loughran, Sandra B.

    2005-01-01

    This article describes "thematic teaching," defined as a process of integrating and linking multiple elements of a curriculum in an ongoing exploration of many different aspects of a topic or subject. Thematic teaching is about students actively constructing their own knowledge. In classrooms where successful thematic work is in progress,…

  14. A-3 Cleared Site

    NASA Image and Video Library

    2007-06-18

    Work to clear the site for the A-3 Test Stand progresses quickly, as seen in this photo taken June 18 from atop the A-1 Test Stand. The next step in construction at 19-acre site will be the arrival of fill dirt in mid-July, followed by pilings and piling caps.

  15. A-3 Cleared Site

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work to clear the site for the A-3 Test Stand progresses quickly, as seen in this photo taken June 18 from atop the A-1 Test Stand. The next step in construction at 19-acre site will be the arrival of fill dirt in mid-July, followed by pilings and piling caps.

  16. 10. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  17. The Managed Hearthstone: Labor and Emotional Work in the Online Community of World of Warcraft

    NASA Astrophysics Data System (ADS)

    Lukacs, Andras; Embrick, David G.; Wright, Talmadge

    Prior analyses of player interactions within massive multi-player online environments (MMOs) rely predominantly on understanding the environments as spheres of leisure—places to "escape" the stress of the "real world." We find in our research on the World of Warcraft, a popular online role-playing game suggests that, in fact, social interaction within the game more closely resembles work. Successful play requires dedicated participants who choose to engage in a highly structured and time-consuming "process" of game progression. Simultaneously, players must also actively engage in the "emotional labor" of acceptably maintaining standards of sociability and guild membership constructed by their gaming peers. We posit that these expectations of both structured progression work and emotional maintenance work significantly blur the existing lines between categorizing work and leisure. While the assumption of leisure shrouds the general expectation of gaming interaction, we suggest a "play as work" paradigm more clearly captures the reality of the demands of The World of Warcraft.

  18. 18 CFR 35.25 - Construction work in progress.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... of pollution produced by the power plant, but does not include any facility that reduces pollution by... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  19. 18 CFR 35.25 - Construction work in progress.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of pollution produced by the power plant, but does not include any facility that reduces pollution by... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  20. 18 CFR 35.25 - Construction work in progress.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of pollution produced by the power plant, but does not include any facility that reduces pollution by... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  1. 18 CFR 35.25 - Construction work in progress.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... public utility applicant to provide for separate customer groups or provide for a rate design... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  2. 18 CFR 35.25 - Construction work in progress.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... public utility applicant to provide for separate customer groups or provide for a rate design... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  3. Learning progressions from a sociocultural perspective: response to "co-constructing cultural landscapes for disciplinary learning in and out of school: the next generation science standards and learning progressions in action"

    NASA Astrophysics Data System (ADS)

    Tytler, Russell

    2016-10-01

    This article discusses a case for a different, socio-cultural way of looking at learning progressions as treated in the next generation science standards (NGSS) as described by Ralph Cordova and Phyllis Balcerzak's paper "Co-constructing cultural landscapes for disciplinary learning in and out of school: the next generation science standards and learning progressions in action". The paper is interesting for a number of reasons, and in this response I will identify different aspects of the paper and link the points made to my own research, and that of colleagues, as complementary perspectives. First, the way that the science curriculum is conceived as an expanding experience that moves from the classroom into the community, across subjects, and across time, links to theoretical positions on disciplinary literacies and notions of learning as apprenticeship into the discursive tools, or `habits of mind' as the authors put it, that underpin disciplinary practice. Second, the formulation of progression through widening communities of practice is a strong feature of the paper, and shows how children take on the role of scientists through this expanding exposure. I will link this approach to some of our own work with school—community science partnerships, drawing on the construct of boundary crossing to tease out relations between school science and professional practice. Third, the demonstration of the expansion of the children's view of what scientists do is well documented in the paper, illustrated by Figure 13 for instance. However I will, in this response, try to draw out and respond to what the paper is saying about the nature of progression; what the progression consists of, over what temporal or spatial dimensions it progresses, and how it can productively frame curriculum processes.

  4. The Redshifts in Relativity

    ERIC Educational Resources Information Center

    Singh, Satya Pal; Singh, Apoorva; Hareet, Prabhav

    2011-01-01

    The progress of modern cosmology took off in 1917 when A. Einstein published his paper on general theory of relativity extending his work of special theory of relativity (1905). In 1922 Alexander Friedmann constructed a mathematical model for expanding Universe that had a big bang in remote past. The experimental evidences could come in 1929 by…

  5. Green Positive Guidance and Green Positive Life Counseling for Decent Work and Decent Lives: Some Empirical Results

    PubMed Central

    Di Fabio, Annamaria; Bucci, Ornella

    2016-01-01

    This article discusses green positive guidance and green positive life counseling for decent work and decent lives. From a green guidance perspective, the connectedness to nature construct is important both in terms of the meaning of work and life construction. The study discussed in this article analyzed the relationship between empathy and connectedness to nature, controlling for the effects of fluid intelligence and personality traits. In this connection, the Advanced Progressive Matrices, the Big Five Questionnaire, and the Interpersonal Reactivity Index were administered to 144 Italian high school students. The study revealed that connecteness to nature was not associated with fluid intelligence and was only moderately associated with personality traits. It was empathy that showed the highest association with connectedness to nature. The results open new opportunities for future research and interventions in green positive guidance/life counseling and green positive decent work. PMID:26973563

  6. Progression in Complexity: Contextualizing Sustainable Marine Resources Management in a 10th Grade Classroom

    ERIC Educational Resources Information Center

    Bravo-Torija, Beatriz; Jimenez-Aleixandre, Maria-Pilar

    2012-01-01

    Sustainable management of marine resources raises great challenges. Working with this socio-scientific issue in the classroom requires students to apply complex models about energy flow and trophic pyramids in order to understand that food chains represent transfer of energy, to construct meanings for sustainable resources management through…

  7. Theory Building through Qualitative Research: Marshalling Opportunities to Advance Cancer Screening Efforts

    ERIC Educational Resources Information Center

    Hay, Jennifer L.; Craddock Lee, Simon J.

    2009-01-01

    Many researchers lack the resources, time, and/or expertise to include qualitative strategies in their research. In recent years, substantive progress has been made among qualitative methodologists themselves to codify and systematize concept construction and typologies in qualitatively derived theory. These authors discuss the work of Rena Pasick…

  8. Design, development and evaluation of Stanford/Ames Extra-Vehicular Activity (EVA) prehensors

    NASA Technical Reports Server (NTRS)

    Leifer, Larry J.; Jameson, J.; Leblanc, M.; Wilson, D.; Sabelman, E.; Schwandt, D.

    1987-01-01

    A summary is given of progress to date on work proposed in 1983 and continued in 1985, including design iterations on three different types of manually powered prehensors, construction of functional mockups of each and culminating in detailed drawings and specifications for suit-compatible sealed units for testing under realistic conditions.

  9. Constructions of Race among Religiously Conservative College Students

    ERIC Educational Resources Information Center

    Modica, Marianne

    2012-01-01

    The "Whites as victims" motif in conversations about race has been well documented in recent decades. When discussing affirmative action hiring policies, a common belief expressed by Whites is that people of color have been permitted to progress unfairly at the expense of harder working Whites. Whites using this discourse see themselves…

  10. 18 CFR 367.53 - Service company property purchased or sold.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... GAS ACT Service Company Property Instructions § 367.53 Service company property purchased or sold. (a..., Construction work in progress (§ 367.1070), as appropriate. (b) If property acquired is in a physical condition... property purchased or sold. 367.53 Section 367.53 Conservation of Power and Water Resources FEDERAL ENERGY...

  11. Seeding Evolutionary Thinking by Engaging Children in Modeling Its Foundations

    ERIC Educational Resources Information Center

    Lehrer, Richard; Schauble, Leona

    2012-01-01

    Although the core work of science is oriented toward constructing, revising, applying, and defending models of the natural world, models appear only rarely in school science, and usually only as illustrations, rather than theory building tools. We describe the rationale and structure for a learning progression to understand the development of…

  12. Reuse and recycle--considering the soil below constructions.

    PubMed

    Suer, Pascal; Wik, Ola; Erlandsson, Martin

    2014-07-01

    The European Construction Products Regulation provides a life cycle based framework for the environmental assessment of construction products. Harmonised European standards for the assessment of the release of dangerous substances and for declaration of environmental performance are in progress. Risk based limit values for the protection of soil and groundwater below construction works will still bet set nationally. In this paper we review the possibilities to expand the ongoing harmonisation to include risk assessment and life cycle assessment (LCA). Based on reviews of national European limit value models (LMVs) for assessment of release to soil and groundwater, two areas for harmonisation emerge: 1- The toxicological criteria. Toxicological endpoints to protect human health and environment are similar, and data from the same toxicological data sets are used to establish acceptance criteria. 2- The emission part of LMVs. We extracted six generic construction works for granular materials. These encompass the most common choices and span the different release scenarios applied. Harmonised emission models would also facilitate LCA and environmental product declaration (EPD). The immission or transport part of the LVMs is less promising for harmonisation. Locating the acceptance criteria point of compliance close to the construction works is advantageous from many aspects and would facilitate harmonisation of assessments. We have identified two different strategies to include recycling in the assessments: 1- Tiered procedure where assessment and declaration of performance are made for the intended primary use of the product only and renewed assessments are made whenever the construction works are demolished and the product is recovered. 2- Scenario based procedure where future recycling scenarios, into new products and construction works, are forecasted. In this case the initial assessment and declaration of environmental performance of a construction product is performed both for the intended primary use of the product and for the recycling scenarios. Copyright © 2014 Elsevier B.V. All rights reserved.

  13. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    NASA Astrophysics Data System (ADS)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  14. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    PubMed Central

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  15. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    PubMed

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zvi H. Meiksin

    Two industrial prototype units for through-the-earth wireless communication were constructed and tested. Preparation for a temporary installation in NIOSH's Lake Lynn mine for the through-the-earth and the in-mine system were completed. Progress was made in the programming of the in-mine system to provide data communication. Work has begun to implement a wireless interface between equipment controllers and our in-mine system.

  17. 48 CFR 1836.213-370 - Additive and deductive items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Additive and deductive... Special Aspects of Contracting for Construction 1836.213-370 Additive and deductive items. When it appears... the work generally as specified and one or more additive or deductive bid items progressively adding...

  18. 48 CFR 1836.213-370 - Additive and deductive items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Additive and deductive... Special Aspects of Contracting for Construction 1836.213-370 Additive and deductive items. When it appears... the work generally as specified and one or more additive or deductive bid items progressively adding...

  19. 48 CFR 1836.213-370 - Additive and deductive items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Additive and deductive... Special Aspects of Contracting for Construction 1836.213-370 Additive and deductive items. When it appears... the work generally as specified and one or more additive or deductive bid items progressively adding...

  20. 48 CFR 1836.213-370 - Additive and deductive items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Additive and deductive... Special Aspects of Contracting for Construction 1836.213-370 Additive and deductive items. When it appears... the work generally as specified and one or more additive or deductive bid items progressively adding...

  1. 48 CFR 1836.213-370 - Additive and deductive items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Additive and deductive... Special Aspects of Contracting for Construction 1836.213-370 Additive and deductive items. When it appears... the work generally as specified and one or more additive or deductive bid items progressively adding...

  2. Widening Participation in Higher Education: Constructions of "Going to University"

    ERIC Educational Resources Information Center

    Bradley, John; Miller, Andy

    2010-01-01

    Progress towards the British Government's goal of 50% of young people undertaking higher education has been slow, particularly among pupils from working-class backgrounds. This study examines the range of viewpoints held by 53 Year 12 pupils in a former coalfield area, all of whom were eligible to apply for university. Each completed a Q-sort on…

  3. Allowance for funds in construction: accounting stepchild and regulatory football

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coughlan, P.B.

    AFC (allowance for funds in construction) is an accounting method of recording the use of additional capital needed to compensate the capital already invested in construction work in progress (CWIP) where CWIP is excluded from the utility's rate base. As a practical matter, the compensation in the form of interest on debt, dividends on preferred and common stocks, and reinvested earnings is paid or recorded currently. Since the CWIP is not included in rate base and current customers are not paying any revenues to support the CWIP capital, the cash to pay the interest comes from a variety of sources,more » including cash revenues covering depreciation and reinvested earnings on rate base capital as well as from sales of additional bonds and stock. Commissions and courts have examined AFC in some depth, but many problems remain. Four unresolved areas are examined in this paper: (1) should AFC be compounded, whether directly or indirectly; (2) who should benefit from the current tax reduction associated with the interest component of AFC; (3) is AFC really a noncash accounting gimmick; (4) what happens when you sell AFC-bearing construction work in progress to a third party. The author presents examples to show why he believes AFC represents valid, good-quality earnings for utilities. It properly represents cash income if certain prerequisite conditions are present and prerequisite procedures followed in its calculation. Among the factors cited in favor of such an allowance by regulators is an avoidance of regulatory lag in much the same way as provided by automatic cost adjustments. (MCW)« less

  4. Innovative Method of Analysis of Actual Cost of Work in Progress

    NASA Astrophysics Data System (ADS)

    Fil, O.; Terentev, V.

    2017-11-01

    The article focuses on the basic theory and practical aspects of improving the strategic management in terms of enhancing the quality of a technological process: these aspects have been proven experimentally by their introduction in company operations. The authors have worked out some proposals aimed at selecting an optimal supplier for building companies as well as the algorithm for the analysis and optimization of a construction company basing on scientific and practical research and the experimental data obtained in the experiment

  5. Experience, Reflection, Learning. Suggestions for Organisers of Schemes of Unified Vocational Preparation.

    ERIC Educational Resources Information Center

    Stanton, Geoff

    United Vocational Preparation (UVP) is a scheme or strategy organized in England to assist young people to make successful progress during the transition from school to work. It consists of courses and assistance to young workers on an individualized basis. This guide is intended to help educators to construct and conduct schemes of UVP. The…

  6. Transformation of two and three-dimensional regions by elliptic systems

    NASA Technical Reports Server (NTRS)

    Mastin, C. Wayne

    1993-01-01

    During this contract period, our work has focused on improvements to elliptic grid generation methods. There are two principle objectives in this project. One objective is to make the elliptic methods more reliable and efficient, and the other is to construct a modular code that can be incorporated into the National Grid Project (NGP), or any other grid generation code. Progress has been made in meeting both of these objectives. The two objectives are actually complementary. As the code development for the NGP progresses, we see many areas where improvements in algorithms can be made.

  7. Pupils' Perceptions of Attainment in Music at the Start of Secondary School in England: A Descriptive Analysis

    ERIC Educational Resources Information Center

    Kokotsaki, Dimitra

    2017-01-01

    The provision of constructive feedback gives meaning to educational assessment and is an important requirement in every good educational system. In addition to the value of summative and formative judgements about a learner's progress, when pupils are given opportunities to assess their own work, they can develop a sense of ownership and…

  8. The Genesis of Creative Greatness: Mini-C and the Expert Performance Approach

    ERIC Educational Resources Information Center

    Beghetto, Ronald A.; Kaufman, James C.

    2007-01-01

    The authors' recent theoretical work has focused on developing the construct of mini-c creativity and illustrating how all levels of creative performance follow a trajectory that starts with novel and personally meaningful interpretations (mini-c), which can then progress to intrapersonally judged novel and meaningful contributions (little-c) and…

  9. A Pluriliteracies Approach to Content and Language Integrated Learning--Mapping Learner Progressions in Knowledge Construction and Meaning-Making

    ERIC Educational Resources Information Center

    Meyer, Oliver; Coyle, Do; Halbach, Ana; Schuck, Kevin; Ting, Teresa

    2015-01-01

    Over the past decades content and language integrated learning (CLIL) research has predominantly focused on the language proficiency of CLIL learners. The results are very promising and show that working language skills in learners, especially reading and listening skills, can be improved through a CLIL programme. Studies focusing on subject…

  10. LSST telescope and site status

    NASA Astrophysics Data System (ADS)

    Gressler, William J.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) Project1 received its construction authorization from the National Science Foundation in August 2014. The Telescope and Site (T and S) group has made considerable progress towards completion in subsystems required to support the scope of the LSST science mission. The LSST goal is to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The summit facility is currently under construction on Cerro Pachón in Chile, with major vendor subsystem deliveries and integration planned over the next several years. This paper summarizes the status of the activities of the T and S group, tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. All major telescope work package procurements have been awarded to vendors and are in varying stages of design and fabrication maturity and completion. The unique M1M3 primary/tertiary mirror polishing effort is completed and the mirror now resides in storage waiting future testing. Significant progress has been achieved on all the major telescope subsystems including the summit facility, telescope mount assembly, dome, hexapod and rotator systems, coating plant, base facility, and the calibration telescope. In parallel, in-house efforts including the software needed to control the observatory such as the scheduler and the active optics control, have also seen substantial advancement. The progress and status of these subsystems and future LSST plans during this construction phase are presented.

  11. A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction

    PubMed Central

    Fu, Fang; Zhang, Tao

    2016-01-01

    A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939

  12. Injectable gellan gum hydrogels with autologous cells for the treatment of rabbit articular cartilage defects.

    PubMed

    Oliveira, João T; Gardel, Leandro S; Rada, Tommaso; Martins, Luís; Gomes, Manuela E; Reis, Rui L

    2010-09-01

    In this work, the ability of gellan gum hydrogels coupled with autologous cells to regenerate rabbit full-thickness articular cartilage defects was tested. Five study groups were defined: (a) gellan gum with encapsulated chondrogenic predifferentiated rabbit adipose stem cells (ASC + GF); (b) gellan gum with encapsulated nonchondrogenic predifferentiated rabbit adipose stem cells (ASC); (c) gellan gum with encapsulated rabbit articular chondrocytes (AC) (standard control); (d) gellan gum alone (control); (e) empty defect (control). Full-thickness articular cartilage defects were created and the gellan gum constructs were injected and left for 8 weeks. The macroscopic aspect of the explants showed a progressive increase of similarity with the lateral native cartilage, stable integration at the defect site, more pronouncedly in the cell-loaded constructs. Tissue scoring showed that ASC + GF exhibited the best results regarding tissue quality progression. Alcian blue retrieved similar results with a better outcome for the cell-loaded constructs. Regarding real-time PCR analyses, ASC + GF had the best progression with an upregulation of collagen type II and aggrecan, and a downregulation of collagen type I. Gellan gum hydrogels combined with autologous cells constitute a promising approach for the treatment of articular cartilage defects, and adipose derived cells may constitute a valid alternative to currently used articular chondrocytes. (c) 2010 Orthopaedic Research Society. Published by Wiley Periodicals, Inc.

  13. Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies in infrastructure construction project management and delay and disruption analysis

    NASA Astrophysics Data System (ADS)

    Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos

    2015-06-01

    Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.

  14. The Collapse of the I-35W Bridge in Minneapolis

    ERIC Educational Resources Information Center

    Feldman, Bernard J.

    2010-01-01

    On Wednesday, Aug. 1, 2007, at 6:05 p.m. (during evening rush hour), the I-35W bridge across the Mississippi River in Minneapolis collapsed, killing 13 people and injuring 145. At the time of the collapse, repair work was in progress on the deck of the bridge, resulting in an additional 287 tons of construction material and equipment being on the…

  15. A New Approach to Threshold Attribute Based Signatures

    DTIC Science & Technology

    2011-01-01

    Inspired by developments in attribute based encryption and signatures, there has recently been a spurtof progress in the direction of threshold ...attribute based signatures (t-ABS). In this work we propose anovel approach to construct threshold attribute based signatures inspired by ring signatures...Thresholdattribute based signatures, dened by a (t; n) threshold predicate, ensure that the signer holds atleastt out of a specied set of n attributes

  16. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    PubMed Central

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite. PMID:25830069

  17. Integrating building information modeling and health and safety for onsite construction.

    PubMed

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  18. Active monitoring as cognitive control of grinders design

    NASA Astrophysics Data System (ADS)

    Flizikowski, Jozef B.; Mrozinski, Adam; Tomporowski, Andrzej

    2017-03-01

    A general monitoring methodology applicable to plastics recyclates grinding processes development for energy engineering, has been presented in this work. The method includes two beings: mathematical aiding an invention and working of a novelty. The common set is composed of characteristics, structure, relationships of knowledge about states and transformations, effectiveness and progress of the devices and machinery engineering, e.g. breaking up in the energy-materials recycling process. This innovations theory is identified by the valuation, estimation, testing and creative archiving the elaborated character and structure of the invention and grinders construction development.

  19. Advanced construction management for lunar base construction - Surface operations planner

    NASA Technical Reports Server (NTRS)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  20. A Construct-Modeling Approach to Develop a Learning Progression of How Students Understand the Structure of Matter

    ERIC Educational Resources Information Center

    Morell, Linda; Collier, Tina; Black, Paul; Wilson, Mark

    2017-01-01

    This paper builds on the current literature base about learning progressions in science to address the question, "What is the nature of the learning progression in the content domain of the structure of matter?" We introduce a learning progression in response to that question and illustrate a methodology, the Construct Modeling (Wilson,…

  1. Women in the Construction Industry in the U.K.: a Cultural Discord?

    NASA Astrophysics Data System (ADS)

    Bagilhole, Barbara M.; Dainty, Andrew R. J.; Neale, Richard H.

    The construction industry is the most male dominated of all industrial sectors in the United Kingdom. This article reports on a study that explored women's and men's experiences of working in the industry, focusing on how the cultural aspects of the workplace environment impinged upon women's career development. We interviewed more than 80 male and female construction professionals from large construction organizations, and compared their career accounts in order to establish the aspects of the workplace culture that had a gender-differentiated impact on progression. We found that construction organizations formed competitive "power" cultures where women's contributions were marginalized and their careers impeded through a combination of inflexible work practices and discriminatory behavior. These barriers to women's careers were maintained in small project teams by autonomous male operational managers. Their locus of control embraced recruitment, promotion, and staff development, which allowed them to sustain a workplace culture intolerant of nontraditional entrants. We conclude that this cultural environment is likely to remain problematic for women unless it can be changed in a way that values their contribution. This requires a radical shift in middle management attitudes, a departure from current organizational human resource management systems, and a wider acceptance of the need for cultural change within the industry.

  2. 23. CONSTRUCTION PROGRESS VIEW LOOKING TOWARD EAST SHOWING CONCRETE BLOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. CONSTRUCTION PROGRESS VIEW LOOKING TOWARD EAST SHOWING CONCRETE BLOCK CONSTRUCTION. INEEL PHOTO NUMBER NRTS-59-4305. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  3. Potential of Progressive Construction Systems in Slovakia

    NASA Astrophysics Data System (ADS)

    Kozlovska, Maria; Spisakova, Marcela; Mackova, Daniela

    2017-10-01

    Construction industry is a sector with rapid development. Progressive technologies of construction and new construction materials also called modern methods of construction (MMC) are developed constantly. MMC represent the adoption of construction industrialisation and the use of prefabrication of components in building construction. One of these modern methods is also system Varianthaus, which is based on, insulated concrete forms principle and provides complete production plant for wall, ceiling and roof elements for a high thermal insulation house construction. Another progressive construction system is EcoB, which represents an insulated precast concrete panel based on combination of two layers, insulation and concrete, produced in a factory as a whole. Both modern methods of construction are not yet known and wide-spread in the Slovak construction market. The aim of this paper is focused on demonstration of MMC using potential in Slovakia. MMC potential is proved based on comparison of the selected parameters of construction process - construction costs and construction time. The subject of this study is family house modelled in three material variants - masonry construction (as a representative of traditional methods of construction), Varianthaus and EcoB (as the representatives of modern methods of construction). The results of this study provide the useful information in decision-making process for potential investors of construction.

  4. A century of progress in industrial and organizational psychology: Discoveries and the next century.

    PubMed

    Salas, Eduardo; Kozlowski, Steve W J; Chen, Gilad

    2017-03-01

    In a century of research published in the Journal of Applied Psychology , we have seen significant advances in our science. The results of this science have broad applications to the workplace and implications for improving organizational effectiveness through a variety of avenues. Research has focused on understanding constructs, relationships, and processes at multiple levels, including individual, team, and organizational. A plethora of research methods and questions have driven this work, resulting in a nuanced understanding of what matters in the workplace. In this paper, we synthesize the most salient discoveries, findings, and/or conclusions in 19 domains. We seek to summarize the progress that has been made and highlight the most salient directions for future work such that the next century of research in industrial and organizational psychological science can be as impactful as the first century has been. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  5. The Construct of Attention in Schizophrenia

    PubMed Central

    Luck, Steven J.; Gold, James M.

    2008-01-01

    Schizophrenia is widely thought to involve deficits of attention. However, the term attention can be defined so broadly that impaired performance on virtually any task could be construed as evidence for a deficit in attention, and this has slowed cumulative progress in understanding attention deficits in schizophrenia. To address this problem, we divide the general concept of attention into two distinct constructs: input selection, the selection of task-relevant inputs for further processing; and rule selection, the selective activation of task-appropriate rules. These constructs are closely tied to working memory, because input selection mechanisms are used to control the transfer of information into working memory and because working memory stores the rules used by rule selection mechanisms. These constructs are also closely tied to executive function, because executive systems are used to guide input selection and because rule selection is itself at key aspect of executive function. Within the domain of input selection, it is important to distinguish between the control of selection—the processes that guide attention to task-relevant inputs—and the implementation of selection—the processes that enhance the processing of the relevant inputs and suppress the irrelevant inputs. Current evidence suggests that schizophrenia involves a significant impairment in the control of selection but little or no impairment in the implementation of selection. Consequently, the CNTRICS participants agreed by consensus that attentional control should be a priority target for measurement and treatment research in schizophrenia. PMID:18374901

  6. Empirical Refinements of a Molecular Genetics Learning Progression: The Molecular Constructs

    ERIC Educational Resources Information Center

    Todd, Amber; Kenyon, Lisa

    2016-01-01

    This article describes revisions to four of the eight constructs of the Duncan molecular genetics learning progression [Duncan, Rogat, & Yarden, (2009)]. As learning progressions remain hypothetical models until validated by multiple rounds of empirical studies, these revisions are an important step toward validating the progression. Our…

  7. Perception of Construction Participants in Construction delays: A case study in Tamilnadu, India.

    NASA Astrophysics Data System (ADS)

    Rathinakumar, V.; Vignesh, T.; Dhivagar, K.

    2017-07-01

    Delays in the construction industry are universal fact, which affects the construction participants. The research work spotlights on determining the prevailing delays in the cities of Tamil Nadu, as perceived by the participants. After a few field level interactions, a questionnaire was framed and administered to the participants i.e., Consultants (50 Nos.), contractors (50 Nos.) and clients (150 Nos.) to understand their perception on the causes of delays. The factors for delay was categorized into 4 groups say Improper project planning, Design related issues, Finance related issues and Resource related issues. The responses were analysed using the SPSS software by applying ANOVA and Regression analysis. From the analysis, it was found that the personal financial problems of the client dominantly affect the entire construction progress and the subsequent design changes by the clients, Inadequate early project planning, labour related issues. Also, the delay groups were found to be the improper project planning and the Resource related issues.

  8. Linking U.S. School District Test Score Distributions to a Common Scale. CEPA Working Paper No. 16-09

    ERIC Educational Resources Information Center

    Reardon, Sean F.; Kalogrides, Demetra; Ho, Andrew D.

    2017-01-01

    There is no comprehensive database of U.S. district-level test scores that is comparable across states. We describe and evaluate a method for constructing such a database. First, we estimate linear, reliability-adjusted linking transformations from state test score scales to the scale of the National Assessment of Educational Progress (NAEP). We…

  9. 20. CONSTRUCTION PROGRESS PHOTO OF INSTRUMENT PANEL IN PLACE IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. CONSTRUCTION PROGRESS PHOTO OF INSTRUMENT PANEL IN PLACE IN OPERATING CORRIDOR. INEEL PHOTO NUMBER NRTS-59-6091. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  10. Chemical analysis of fogwater at Delhi, North India

    NASA Astrophysics Data System (ADS)

    Kapoor, R. K.; Tiwari, S.; Ali, K.; Singh, G.

    Fogwater collected at Delhi (28° 35'N, 77°12'E, 217 m a.s.l.) during winter 1989-1990 was found to be acidic compared to pure water pH of 7. This was attributed to highway widening work in progress and an increase in vehicular traffic on the nearby road, apart from construction work in a residential complex and an increase in industrial activity within 6 km to the southwest. Results are compared with the earlier studies at Delhi and those with highly acidic fog data published for some regions of California in the United States of America.

  11. Operationalisation of the construct of access to dental care: a position paper and proposed conceptual definitions.

    PubMed

    Harris, R V

    2013-06-01

    'Access' is a term readily used in a political and policy context, but one which has not leant itself to measurement of progress towards policy goals or comparisons between health systems. Like 'quality', 'access' is a multi-dimensional construct, but currently often remains a vague and abstract concept which is difficult to translate into something specific, concrete and therefore measureable. The paper describes previous work and identifies a need for a greater consensus and conceptual clarity in the selection of metrics for dental access. The construct of dental access is described as involving the concepts of 1: opportunity for access; 2, realised access (utilisation); 3, equity and 4, outcomes. Proposed conceptual definitions are given and a case made for measuring 'initial utilisation' separately from 'continued utilisation', reflecting modern approaches which distinguish 'entry access' (gaining entry to the dental care system), from the process of gaining access to higher levels of care. Using a distinction between 'entry access' and 'effective access' allows a choice of whether to restrict measurement to mainly supply side considerations, or alternatively to extend the measurement to include whether there is equity in the proportion of patients who are able obtain effective needed interventions. A development of conceptual definitions of dental access could facilitate measurement of progress towards policy goals and operationalisation of the construct.

  12. Solar prediction and intelligent machines

    NASA Technical Reports Server (NTRS)

    Johnson, Gordon G.

    1987-01-01

    The solar prediction program is aimed at reducing or eliminating the need to throughly understand the process previously developed and to still be able to produce a prediction. Substantial progress was made in identifying the procedures to be coded as well as testing some of the presently coded work. Another project involves work on developing ideas and software that should result in a machine capable of learning as well as carrying on an intelligent conversation over a wide range of topics. The underlying idea is to use primitive ideas and construct higher order ideas from these, which can then be easily related one to another.

  13. 78 FR 25482 - Notice of Revised Determination on Reconsideration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ...-PROGRESSIVE SOFTWARE COMPUTING, QUALITY TESTING SERVICES, INC., RAILROAD CONSTRUCTION CO. OF SOUTH JERSEY, INC..., LP, PSCI- Progressive Software Computing, Quality Testing Services, Inc., Railroad Construction Co..., ANDERSON CONSTRUCTION SERVICES, BAKER PETROLITE, BAKERCORP, BELL-FAST FIRE PROTECTION INC., BOLTTECH INC...

  14. Single-stranded DNA and RNA origami.

    PubMed

    Han, Dongran; Qi, Xiaodong; Myhrvold, Cameron; Wang, Bei; Dai, Mingjie; Jiang, Shuoxing; Bates, Maxwell; Liu, Yan; An, Byoungkwon; Zhang, Fei; Yan, Hao; Yin, Peng

    2017-12-15

    Self-folding of an information-carrying polymer into a defined structure is foundational to biology and offers attractive potential as a synthetic strategy. Although multicomponent self-assembly has produced complex synthetic nanostructures, unimolecular folding has seen limited progress. We describe a framework to design and synthesize a single DNA or RNA strand to self-fold into a complex yet unknotted structure that approximates an arbitrary user-prescribed shape. We experimentally construct diverse multikilobase single-stranded structures, including a ~10,000-nucleotide (nt) DNA structure and a ~6000-nt RNA structure. We demonstrate facile replication of the strand in vitro and in living cells. The work here thus establishes unimolecular folding as a general strategy for constructing complex and replicable nucleic acid nanostructures, and expands the design space and material scalability for bottom-up nanotechnology. Copyright © 2017 The Authors, some rights reserved; exclusive licensee American Association for the Advancement of Science. No claim to original U.S. Government Works.

  15. Modelling of project cash flow on construction projects in Malang city

    NASA Astrophysics Data System (ADS)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  16. The ARES High-level Intermediate Representation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moss, Nicholas David

    The LLVM intermediate representation (IR) lacks semantic constructs for depicting common high-performance operations such as parallel and concurrent execution, communication and synchronization. Currently, representing such semantics in LLVM requires either extending the intermediate form (a signi cant undertaking) or the use of ad hoc indirect means such as encoding them as intrinsics and/or the use of metadata constructs. In this paper we discuss a work in progress to explore the design and implementation of a new compilation stage and associated high-level intermediate form that is placed between the abstract syntax tree and when it is lowered to LLVM's IR. Thismore » highlevel representation is a superset of LLVM IR and supports the direct representation of these common parallel computing constructs along with the infrastructure for supporting analysis and transformation passes on this representation.« less

  17. 10. copy of a construction progress photograph taken by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. copy of a construction progress photograph taken by the Hunkin-Conkey Construction Company, dated October 25, 1916. Photo shows the reinforced concrete subway deck as it appeared shortly after construction. A portion of arch number 12, can be see. Photo courtesy of Cleveland Public Library. - Detroit Superior High Level Bridge, Cleveland, Cuyahoga County, OH

  18. Applying Item Response Theory methods to design a learning progression-based science assessment

    NASA Astrophysics Data System (ADS)

    Chen, Jing

    Learning progressions are used to describe how students' understanding of a topic progresses over time and to classify the progress of students into steps or levels. This study applies Item Response Theory (IRT) based methods to investigate how to design learning progression-based science assessments. The research questions of this study are: (1) how to use items in different formats to classify students into levels on the learning progression, (2) how to design a test to give good information about students' progress through the learning progression of a particular construct and (3) what characteristics of test items support their use for assessing students' levels. Data used for this study were collected from 1500 elementary and secondary school students during 2009--2010. The written assessment was developed in several formats such as the Constructed Response (CR) items, Ordered Multiple Choice (OMC) and Multiple True or False (MTF) items. The followings are the main findings from this study. The OMC, MTF and CR items might measure different components of the construct. A single construct explained most of the variance in students' performances. However, additional dimensions in terms of item format can explain certain amount of the variance in student performance. So additional dimensions need to be considered when we want to capture the differences in students' performances on different types of items targeting the understanding of the same underlying progression. Items in each item format need to be improved in certain ways to classify students more accurately into the learning progression levels. This study establishes some general steps that can be followed to design other learning progression-based tests as well. For example, first, the boundaries between levels on the IRT scale can be defined by using the means of the item thresholds across a set of good items. Second, items in multiple formats can be selected to achieve the information criterion at all the defined boundaries. This ensures the accuracy of the classification. Third, when item threshold parameters vary a bit, the scoring rubrics and the items need to be reviewed to make the threshold parameters similar across items. This is because one important design criterion of the learning progression-based items is that ideally, a student should be at the same level across items, which means that the item threshold parameters (d1, d 2 and d3) should be similar across items. To design a learning progression-based science assessment, we need to understand whether the assessment measures a single construct or several constructs and how items are associated with the constructs being measured. Results from dimension analyses indicate that items of different carbon transforming processes measure different aspects of the carbon cycle construct. However, items of different practices assess the same construct. In general, there are high correlations among different processes or practices. It is not clear whether the strong correlations are due to the inherent links among these process/practice dimensions or due to the fact that the student sample does not show much variation in these process/practice dimensions. Future data are needed to examine the dimensionalities in terms of process/practice in detail. Finally, based on item characteristics analysis, recommendations are made to write more discriminative CR items and better OMC, MTF options. Item writers can follow these recommendations to write better learning progression-based items.

  19. 18. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARRELS IN PLACE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARRELS IN PLACE TO BE USED AS PIPE TUNNELS. INEEL PHOTO NUMBER NRTS-59-925. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  20. AERIAL - MSC SITE - CONSTRUCTION PROGRESS - MSC

    NASA Image and Video Library

    1963-12-24

    S63-23656 (1963) --- Aerial view of construction progress at the Manned Spacecraft Center, Houston, Texas. NOTE: The Manned Spacecraft Center was named Lyndon B. Johnson Space Center in memory of the late President following his death.

  1. 42 CFR 137.352 - What is contained in a construction project progress report?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...

  2. 42 CFR 137.352 - What is contained in a construction project progress report?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...

  3. Methods of erection of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Cherednichenko, Nadezhda; Oleinik, Pavel

    2018-03-01

    The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.

  4. 6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND MOUNDED BUNKER. CONSTRUCTION WAS 99 PERCENT COMPLETE. CAMERA IS FACING WEST. INEL PHOTO NUMBER 65-5435, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  5. Ultra-dense magnetoresistive mass memory

    NASA Technical Reports Server (NTRS)

    Daughton, J. M.; Sinclair, R.; Dupuis, T.; Brown, J.

    1992-01-01

    This report details the progress and accomplishments of Nonvolatile Electronics (NVE), Inc., on the design of the wafer scale MRAM mass memory system during the fifth quarter of the project. NVE has made significant progress this quarter on the one megabit design in several different areas. A test chip, which will verify a working GMR bit with the dimensions required by the 1 Meg chip, has been designed, laid out, and is currently being processed in the NVE labs. This test chip will allow electrical specifications, tolerances, and processing issues to be finalized before construction of the actual chip, thus providing a greater assurance of success of the final 1 Meg design. A model has been developed to accurately simulate the parasitic effects of unselected sense lines. This model gives NVE the ability to perform accurate simulations of the array electronic and test different design concepts. Much of the circuit design for the 1 Meg chip has been completed and simulated and these designs are included. Progress has been made in the wafer scale design area to verify the reliable operation of the 16 K macrocell. This is currently being accomplished with the design and construction of two stand alone test systems which will perform life tests and gather data on reliabiliy and wearout mechanisms for analysis.

  6. Assessment of the Continuous Progress Report for the Early Learning Years (An Examination of Scale Construction).

    ERIC Educational Resources Information Center

    Tuck, Kathy D.

    An evaluation was conducted to examine the structure and design of the Continuous Progress Report (CPR), an observation scale used to measure students' early developmental skills in the District of Columbia public schools. Item construction and the relative consistency of measurement constructs in the CPR were the specific focus of the evaluation.…

  7. Advocating mindset for cooperative partnership for better future of construction industry

    NASA Astrophysics Data System (ADS)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  8. Nuclear physics research at the University of Richmond. Progress report, November 1, 1994--October 31, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vineyard, M.F.; Gilfoyle, G.P.; Major, R.W.

    Summarized in this report is the progress achieved during the period from November 1, 1994 to October 31, 1995. The experimental work described in this report is in electromagnetic and heavy-ion nuclear physics. The effort in electromagnetic nuclear physics is in preparation for the research program at the Continuous Electron Beam Accelerator Facility (CEBAF) and is focused on the construction and use of the CEBAF Large Acceptance Spectrometer (CLAS). The heavy-ion experiments were performed at the Argonne National Laboratory ATLAS facility and SUNY, Stony Brook. The physics interests driving these efforts at CEBAF are in the study of the structure,more » interactions, and nuclear-medium modifications of mesons and baryons. This year, an extension of the experiment to measure the magnetic form factor of the neutron was approved by the CEBAF Program Advisory Committee Nine (PAC9) for beam at 6 GeV. The authors also submitted updates to PAC9 on the experiments to measure inclusive {eta} photoproduction in nuclei and electroproduction of the {Lambda}, {Lambda}*(1520), and f{sub 0}(975). In addition to these experiments, the authors collaborated on a proposal to measure rare radiative decays of the {phi} meson which was also approved by PAC9. Their contributions to the construction of the CLAS include the development of the drift-chamber gas system, drift-chamber software, and controls software. Major has been leading the effort in the construction of the gas system. In the last year, the Hall B gas shed was constructed and the installation of the gas system components built at the University of Richmond has begun. Over the last six years, the efforts in low-energy heavy-ion physics have decreased due to the change in focus to electromagnetic nuclear physics at CEBAF. Most of the heavy-ion work is completed and there are now new experiments planned. Included in this report are two papers resulting from collaborations on heavy-ion experiments.« less

  9. The Advanced Technology Solar Telescope: design and early construction

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer

    2012-09-01

    The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.

  10. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) OVERALL VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) OVERALL VIEW LOOKING SOUTHEAST; CONSTRUCTION 34 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3034. Holmes, Photographer, 6/23/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  11. Processing and thermodynamics research, Volume II. Monthly progress report, November 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Data assembly is in progress on the Venezuelan Cerro Negro, California, Wilmington and Mexican Mayan crudes. A draft of a proposal is in preparation that might join this correlational work with complementary correlational work at the University of Oklahoma (Project BPT1). Cerro Negro 200 to 425/sup 0/C and 425 to 550/sup 0/C saturate fractions were analyzed with the CEC 21-103 mass spectrometer using ASTM method D2786, and experiments were devised to establish reproducibility of analyses with the KRATOS MS-50 (Project BPT2). Thermodynamic property measurements on organic nitrogen compounds included a liquid phase heat capacity study of 2,5-dimethylpyridine, and the oxygenmore » sensitivity of phenanthridine was checked prior to bomb calorimetry (Project BPT3A). Heat capacity measurements on chroman are progressing well, and vapor pressure measurements of tetrahydrophenanthrene are in progress (Project BPT3B). Work was begun on the design and procurement of equipment necessary for construction of a bench scale catalytic cracking unit. The supercritical extraction unit is being assembled (Project OPT1). Thiopene separations were begun on Cerro Negro 425 to 550/sup 0/C neutrals, and separation of sulfides from Cerro Negro 550 to 700/sup 0/C and 700+/sup 0/C neutrals was completed (Project OPT2). Preparations for PVT studies of methanol are nearing completion, and a list of critically needed PVT measurements was reviewed to help select the next compound for study. A possible candidate is hydrogen sulfide. (Project OPT3). Good progress continues in the treatment of the RP feed (Project OPT4) to recover Milspec F-76. It is anticipated that 85% recovery is possible by the chemical treatment/distillation process.« less

  12. Recruitment criteria and attraction strategies for local trained labour in Malaysia’s construction industry

    NASA Astrophysics Data System (ADS)

    Manap, N.; Noh, NH Mohd; Syahrom, N.

    2017-12-01

    Development in Malaysia is booming which can be witnessed by the various construction projects that currently in progress, especially in the state of Johor which has the highest value of construction work completed for the third quarter of 2016. This necessarily requires skilled labours in a high number especially among the locals since it has been reported that Malaysia’s construction industry is having problems related to the shortage of local skilled labour. In addition, the local workers have been reported unable to fulfil the demand of construction market. Hence, it caused the contractor to import foreign workers to meet the needs and requirement of labour market in construction sector. This study aims of two objectives; to determine the criteria set by the construction company in recruiting local skilled labour and to study the strategies that can attract local skilled labour to join construction industry. Questionnaire has been distributed to G7 contractor in the state of Johor in order to achieve the objectives of this study. Collected data was then evaluated and tested for its reliability using the SPSS 20.0 software before it can be analysed in order to obtain the mean value, frequencies and percentage. The outcome of this study indicates that the prospective employer prefers to work with man and they require young, experienced, knowledgeable and skilled workers in doing the job. Most of the strategies that have been selected are mainly related to money namely salary increment, bonus, allowance and overtime payment, apart from upgrading labours welfare and providing a better accommodation. This study can be a guideline to both skills institution and contractor to improve on what they are lacking in order to encourage the local trained skills labour to join the industry.

  13. An exploratory study into the effect of time-restricted internet access on face-validity, construct validity and reliability of postgraduate knowledge progress testing

    PubMed Central

    2013-01-01

    Background Yearly formative knowledge testing (also known as progress testing) was shown to have a limited construct-validity and reliability in postgraduate medical education. One way to improve construct-validity and reliability is to improve the authenticity of a test. As easily accessible internet has become inseparably linked to daily clinical practice, we hypothesized that allowing internet access for a limited amount of time during the progress test would improve the perception of authenticity (face-validity) of the test, which would in turn improve the construct-validity and reliability of postgraduate progress testing. Methods Postgraduate trainees taking the yearly knowledge progress test were asked to participate in a study where they could access the internet for 30 minutes at the end of a traditional pen and paper test. Before and after the test they were asked to complete a short questionnaire regarding the face-validity of the test. Results Mean test scores increased significantly for all training years. Trainees indicated that the face-validity of the test improved with internet access and that they would like to continue to have internet access during future testing. Internet access did not improve the construct-validity or reliability of the test. Conclusion Improving the face-validity of postgraduate progress testing, by adding the possibility to search the internet for a limited amount of time, positively influences test performance and face-validity. However, it did not change the reliability or the construct-validity of the test. PMID:24195696

  14. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  15. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  16. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING OVERALL BLOCK EXTERIOR WALLS; CONSTRUCTION 65 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-4976. Holmes, Photographer, 9/26/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  17. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING EAST SHOWING EXCAVATION AND FORMING; CONSTRUCTION 6 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-59-4935. J. Anderson, Photographer, 9/21/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  18. Customizable 3D Printed ‘Plug and Play’ Millifluidic Devices for Programmable Fluidics

    PubMed Central

    Tsuda, Soichiro; Jaffery, Hussain; Doran, David; Hezwani, Mohammad; Robbins, Phillip J.; Yoshida, Mari; Cronin, Leroy

    2015-01-01

    Three dimensional (3D) printing is actively sought after in recent years as a promising novel technology to construct complex objects, which scope spans from nano- to over millimeter scale. Previously we utilized Fused deposition modeling (FDM)-based 3D printer to construct complex 3D chemical fluidic systems, and here we demonstrate the construction of 3D milli-fluidic structures for programmable liquid handling and control of biological samples. Basic fluidic operation devices, such as water-in-oil (W/O) droplet generators for producing compartmentalized mono-disperse droplets, sensor-integrated chamber for online monitoring of cellular growth, are presented. In addition, chemical surface treatment techniques are used to construct valve-based flow selector for liquid flow control and inter-connectable modular devices for networking fluidic parts. As such this work paves the way for complex operations, such as mixing, flow control, and monitoring of reaction / cell culture progress can be carried out by constructing both passive and active components in 3D printed structures, which designs can be shared online so that anyone with 3D printers can reproduce them by themselves. PMID:26558389

  19. Initial Development and Psychometric Properties of a New Measure of Substance Use Disorder "Recovery Progression": The Recovery Progression Measure (RPM).

    PubMed

    Elison, Sarah; Davies, Glyn; Ward, Jonathan

    2016-07-28

    There is a growing literature around substance use disorder treatment outcomes measures. Various constructs have been suggested as being appropriate for measuring recovery outcomes, including "recovery capital" and "treatment progression." However, these previously proposed constructs do not measure changes in psychosocial functioning during the recovery process. Therefore, a new psychometric assessment, the "Recovery Progression Measure" (RPM), has been developed to measure this recovery oriented psychosocial change. The aims of this study were to evaluate the reliability and factor structure of the RPM via data collected from 2218 service users being treated for their substance dependence. Data were collected from service users accessing the Breaking Free Online (BFO) substance use disorder treatment and recovery program, which has within its baseline assessment a 36-item psychometric measure previously developed by the authors to assess the six areas of functioning described in the RPM. Reliability analyses and exploratory factor analyses (EFA) were conducted to examine the underlying factor structure of the RPM measure. Internal reliability of the RPM measure was found to be excellent (α > .70) with the overall assessment to have reliability α = .89, with item-total correlations revealing moderate-excellent reliability of individual items. EFA revealed the RPM to contain an underlying factor structure of eight components. This study provides initial data to support the reliability of the RPM as a recovery measure. Further work is now underway to extend these findings, including convergent and predictive validity analyses.

  20. 24. CONSTRUCTION PROGRESS VIEW TO NORTHWEST, SHOWING BLOWER BUILDING. INEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. CONSTRUCTION PROGRESS VIEW TO NORTHWEST, SHOWING BLOWER BUILDING. INEEL PHOTO NUMBER NRTS-60-4407. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  1. Beyond the classroom: a case study of immigrant safety liaisons in residential construction.

    PubMed

    Ochsner, Michele; Marshall, Elizabeth G; Martino, Carmen; Pabelón, Marién Casillas; Kimmel, Louis; Rostran, Damaris

    2012-01-01

    Latino day laborers often work at dangerous construction sites with little power to change conditions. We describe the development, implementation, and early-stage results of a program to train immigrant day laborers as safety liaisons. These are construction workers prepared to recognize and respond to health and safety hazards. Based in Newark, NJ, the project involves collaboration between New Labor, a membership-based worker center, and university researchers and labor educators. Safety liaisons undergo training and receive ongoing support for their roles. Both qualitative and quantitative data are collected to monitor progress. Although lacking in formal authority, safety liaisons have prompted improvements at specific sites, filed OSHA complaints, and developed a local worker council. Participatory training methods, opportunities for leadership outside the classroom, and participation in project planning have strengthened liaisons' effectiveness, leadership skills, and commitment. The safety liaison approach could be adapted by worker centers and their partner organizations.

  2. 19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL PIPING. INEEL PHOTO NUMBER NRTS-59-3212. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  3. 15. CONSTRUCTION PROGRESS PHOTO SHOWING FORMS GOING UP ON ACCESS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. CONSTRUCTION PROGRESS PHOTO SHOWING FORMS GOING UP ON ACCESS CORRIDOR. INEEL PHOTO NUMBER NRTS-59-336. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  4. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING DECK FORMING FOR SOUTH SECTION OF OPERATING CORRIDOR; CONSTRUCTION 44 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3624. Holmes, Photographer, 7/25/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  5. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHWEST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHWEST, SHOWING FORMING FOR NORTH WALLS OF CELLS 1, 4 AND 5; CONSTRUCTION 21 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-1874. Holmes, Photographer, 4/21/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. [Positive occupational health psychology: an introduction].

    PubMed

    Bakker, Arnold B; Rodríguez-Muñoz, Alfredo

    2012-02-01

    This article introduces the monographic section on Positive Occupational Health Psychology (POHP), presenting eight theoretical and empirical papers about diverse topics. Traditionally, research on occupational health has mainly been focused on causes of diseases and on identifying and preventing work factors related to worker's impaired health. However, this biased view may not provide a complete understanding of the mechanisms that lead to employee well-being and performance. We discuss the differences of POHP with similar constructs, and review reasons for its importance in the development of this field. Overall, the studies included in the monographic section show the usefulness of focusing on positive constructs, and present ideas and questions that we hope may help to further our progress in the field of POHP.

  7. Cavity Enhanced Absorption Spectroscopy Using a Broadband Prism Cavity and a Supercontinuum Source

    NASA Astrophysics Data System (ADS)

    Johnston, Paul S.; Lehmann, Kevin K.

    2009-06-01

    The multiplex advantage of current cavity enhanced spectrometers is limited by the high reflectivity bandwidth of the mirrors used to construct the high finesse cavity. Previously, we reported the design and construction of a new spectrometer that circumvents this limitation by utilizing Brewster^{,}s angle prism retroreflectors. The prisms, made from fused silica and combined with a supercontinuum source generated by pumping a highly nonlinear photonic crystal fiber, yields a spectral window ranging from 500 nm to 1750 nm. Recent progress in the instruments development will be discussed, including work on modeling the prism cavity losses, alternative prism material for use in the UV and mid-IR spectral regions, and a new high power supercontinuum source based on mode-locked picosecond laser.

  8. 21. CONSTRUCTION PROGRESS VIEW OF CALCINER VESSEL ON LOW BOY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. CONSTRUCTION PROGRESS VIEW OF CALCINER VESSEL ON LOW BOY EN ROUTE TO FACILITY. INEEL PHOTO NUMBER NRTS-60-2487. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  9. 22. CONSTRUCTION PROGRESS PHOTO SHOWING WORKERS LOWERING CALCINER VESSEL INTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. CONSTRUCTION PROGRESS PHOTO SHOWING WORKERS LOWERING CALCINER VESSEL INTO CELL THROUGH THE HATCH. INEEL PHOTO NUMBER NRTS-60-2485. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  10. Recent progress in DNA origami technology.

    PubMed

    Endo, Masayuki; Sugiyama, Hiroshi

    2011-06-01

    DNA origami is an emerging technology for designing defined two-dimensional DNA nanostructures. In this review, we focus on and describe several types of DNA origami-related studies, as follows: (1) programmed DNA origami assembly, (2) DNA origami-templated molecular assembly, (3) design and construction of various three-dimensional DNA origami structures, (4) programmed functionalization of DNA origami and combination with top-down nanotechnology, (5) single molecular observation on a designed DNA origami, and (6) DNA nanomachines working on a DNA origami. © 2011 by John Wiley & Sons, Inc.

  11. Work-in-Progress Presented at the Army Symposium on Solid Mechanics, 1980 - Designing for Extremes: Environment, Loading, and Structural Behavior Held at Cape Cod, Massachusetts, 29 September-2 October 1980

    DTIC Science & Technology

    1980-09-01

    relating x’and y’ Figure 2: Basic Laboratory Simulation Model 73 COMPARISON OF COMPUTED AND MEASURED ACCELERATIONS IN A DYNAMICALLY LOADED TACTICAL...Survival (General) Displacements Mines (Ordnance) Telemeter Systems Dynamic Response Models Temperatures Dynamics Moisture Thermal Stresses Energy...probabilistic reliability model for the XM 753 projectile rocket motor to bulkhead joint under extreme loading conditions is constructed. The reliability

  12. DIVA V2.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CHEN, JOANNA; SIMIRENKO, LISA; TAPASWI, MANJIRI

    The DIVA software interfaces a process in which researchers design their DNA with a web-based graphical user interface, submit their designs to a central queue, and a few weeks later receive their sequence-verified clonal constructs. Each researcher independently designs the DNA to be constructed with a web-based BioCAD tool, and presses a button to submit their designs to a central queue. Researchers have web-based access to their DNA design queues, and can track the progress of their submitted designs as they progress from "evaluation", to "waiting for reagents", to "in progress", to "complete". Researchers access their completed constructs through themore » central DNA repository. Along the way, all DNA construction success/failure rates are captured in a central database. Once a design has been submitted to the queue, a small number of dedicated staff evaluate the design for feasibility and provide feedback to the responsible researcher if the design is either unreasonable (e.g., encompasses a combinatorial library of a billion constructs) or small design changes could significantly facilitate the downstream implementation process. The dedicated staff then use DNA assembly design automation software to optimize the DNA construction process for the design, leveraging existing parts from the DNA repository where possible and ordering synthetic DNA where necessary. SynTrack software manages the physical locations and availability of the various requisite reagents and process inputs (e.g., DNA templates). Once all requisite process inputs are available, the design progresses from "waiting for reagents" to "in progress" in the design queue. Human-readable and machine-parseable DNA construction protocols output by the DNA assembly design automation software are then executed by the dedicated staff exploiting lab automation devices wherever possible. Since the all employed DNA construction methods are sequence-agnostic, standardized (utilize the same enzymatic master mixes and reaction conditions), completely independent DNA construction tasks can be aggregated into the same multi-well plates and pursued in parallel. The resulting sets of cloned constructs can then be screened by high-throughput next-gen sequencing platforms for sequence correctness. A combination of long read-length (e.g., PacBio) and paired-end read platforms (e.g., Illumina) would be exploited depending the particular task at hand (e.g., PacBio might be sufficient to screen a set of pooled constructs with significant gene divergence). Post sequence verification, designs for which at least one correct clone was identified will progress to a "complete" status, while designs for which no correct clones wereidentified will progress to a "failure" status. Depending on the failure mode (e.g., no transformants), and how many prior attempts/variations of assembly protocol have been already made for a given design, subsequent attempts may be made or the design can progress to a "permanent failure" state. All success and failure rate information will be captured during the process, including at which stage a given clonal construction procedure failed (e.g., no PCR product) and what the exact failure was (e.g. assembly piece 2 missing). This success/failure rate data can be leveraged to refine the DNA assembly design process.« less

  13. The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lebon, P.; Bosgiraud, J.M.; Foin, R.

    2013-07-01

    The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequencesmore » anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)« less

  14. Approximate Evaluation of Reliability and Availability via Perturbation Analysis.

    DTIC Science & Technology

    1986-12-01

    generating the dxact answers to which the results of the approximation will be compared are discussed:." - 87 7" 2 04 2LOISTRIGUTIONIAVAILASILITYI OF...appropriately, constructing the Markov process that approximately governs interclass behavior from the result above (this is called the enlarged... compared to a numerical or analytical computation of the aame quantities. This work and its continuation represents our progress so far on Goal 3. 2.4I

  15. Parametric estimation for reinforced concrete relief shelter for Aceh cases

    NASA Astrophysics Data System (ADS)

    Atthaillah; Saputra, Eri; Iqbal, Muhammad

    2018-05-01

    This paper was a work in progress (WIP) to discover a rapid parametric framework for post-disaster permanent shelter’s materials estimation. The intended shelters were reinforced concrete construction with bricks as its wall. Inevitably, in post-disaster cases, design variations were needed to help suited victims condition. It seemed impossible to satisfy a beneficiary with a satisfactory design utilizing the conventional method. This study offered a parametric framework to overcome slow construction-materials estimation issue against design variations. Further, this work integrated parametric tool, which was Grasshopper to establish algorithms that simultaneously model, visualize, calculate and write the calculated data to a spreadsheet in a real-time. Some customized Grasshopper components were created using GHPython scripting for a more optimized algorithm. The result from this study was a partial framework that successfully performed modeling, visualization, calculation and writing the calculated data simultaneously. It meant design alterations did not escalate time needed for modeling, visualization, and material estimation. Further, the future development of the parametric framework will be made open source.

  16. 4. CONSTRUCTION PROGRESS VIEW OF EQUIPMENT IN FRONT PART OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CONSTRUCTION PROGRESS VIEW OF EQUIPMENT IN FRONT PART OF CONTROL BUNKER (TRANSFORMER, HYDRAULIC TANK, PUMP, MOTOR). SHOWS UNLINED CORRUGATED METAL WALL. CAMERA FACING EAST. INEL PHOTO NUMBER 65-5433, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  17. Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madrak, R.; Dey, J.; Duel, K.

    A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main reason for adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years optimization and study, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status ofmore » the construction.« less

  18. Nano-Aptasensing in Mycotoxin Analysis: Recent Updates and Progress.

    PubMed

    Rhouati, Amina; Bulbul, Gonca; Latif, Usman; Hayat, Akhtar; Li, Zhan-Hong; Marty, Jean Louis

    2017-10-28

    Recent years have witnessed an overwhelming integration of nanomaterials in the fabrication of biosensors. Nanomaterials have been incorporated with the objective to achieve better analytical figures of merit in terms of limit of detection, linear range, assays stability, low production cost, etc. Nanomaterials can act as immobilization support, signal amplifier, mediator and artificial enzyme label in the construction of aptasensors. We aim in this work to review the recent progress in mycotoxin analysis. This review emphasizes on the function of the different nanomaterials in aptasensors architecture. We subsequently relate their features to the analytical performance of the given aptasensor towards mycotoxins monitoring. In the same context, a critically analysis and level of success for each nano-aptasensing design will be discussed. Finally, current challenges in nano-aptasensing design for mycotoxin analysis will be highlighted.

  19. 16. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARREL BEING LOWERED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. CONSTRUCTION PROGRESS PHOTO SHOWING SURPLUS GUN BARREL BEING LOWERED INTO PLACE FOR USE AS PIPE TUNNEL. INEEL PHOTO NUMBER NRTS-59-709. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  20. 25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN WHEN STRUCTURE WAS 99 PERCENT COMPLETE. INEEL PHOTO NUMBER NRTS-60-5409. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  1. Southern African Large Telescope (SALT) project: progress and status after 2 years

    NASA Astrophysics Data System (ADS)

    Meiring, Jacobus G.; Buckley, David A. H.; Lomberg, Michael C.; Stobie, Robert S.

    2003-02-01

    The Southern African Large Telescope (SALT) is a 10-m class optical/IR segmented mirror telescope based on the groundbreaking, low cost, Hobby-Eberly Telescope (HET) design. Approval to construct and operate SALT, which will be the largest single optical telescope in the Southern Hemisphere, was given by the South African Government in November 1999, after sufficient guarantees of matching funding from international partners were secured. Facility construction started in January 2001, and SALT is due to start operations by December 2004. SALT will enable a quantum leap in astronomical research capability in Southern Africa, and indeed the continent, where currently the largest telescope is a modest 1.9-m, dating to the 1940s. A substantial amount of design work for SALT has been completed, sourced from multiple suppliers, with ~60% South African content. South African industry is well equipped to handle the construction of most of the telescope, the exceptions being the glass ceramic mirror blanks (from LZOS in Russia), the polishing and ion figuring of these (Eastman Kodak in the USA), and fabrication of the four-element spherical aberration corrector (SAGEM in France). This paper will present (1) the scientific requirements, (2) the specified performance of SALT, (3) the basic design, with emphasis on the innovative modifications to the HET design that enable significantly improved performance, (4) the progress and status of the project, currently in its construction phase, (5) the first generation instrument suite, (6) the management and organisation of the project and (7) the international partnership in SALT.

  2. 48 CFR 9904.417-60 - Illustrations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... should be added to the construction-in-progress account in recognition of the cost of money related to... should be added to the construction-in-progress account in recognition of the cost of money while under... the costs were incurred at a fairly uniform rate throughout the period. Because of the pattern of cost...

  3. Construction Management Activities of Governmental Agencies in the New England Area During the Construction Phase.

    DTIC Science & Technology

    1980-02-01

    automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined

  4. 71. ARAII. Construction progress at SL1 site near end of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    71. ARA-II. Construction progress at SL-1 site near end of 1957. Buildings from right to left are guard house, support building, reactor building, water tank and pump house. Construction was 23 percent complete. December 20, 1957. Ineel photo no. 57-6224. Photographer: Jack L. Anderson. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  5. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12124. Unknown Photographer, 9/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. CONSTRUCTION PROGRESS PHOTO SHOWING WEST STORAGE BASIN AT FUEL STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING WEST STORAGE BASIN AT FUEL STORAGE BUILDING (CPP-603). INL PHOTO NUMBER NRTS-51-689. Unknown Photographer, 1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  7. 42 CFR 137.352 - What is contained in a construction project progress report?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...

  8. CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING SOUTH. INL PHOTO NUMBER NRTS-50-693. Unknown Photographer, 1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  9. CONSTRUCTION PROGRESS PHOTO SHOWING MAIN PROCESSING BUILDING (CPP601) LOOKING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTH. INL PHOTO NUMBER NRTS-51-1387. Unknown Photographer, 1/31/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  10. CONSTRUCTION PROGRESS PHOTO SHOWING FUEL STORAGE BUILDING (CPP603) LOOKING NORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING FUEL STORAGE BUILDING (CPP-603) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-895. Unknown Photographer, 10/30/1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  11. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12573. R.G. Larsen, Photographer, 10/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  12. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING INITIAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING INITIAL EXCAVATION. INL PHOTO NUMBER NRTS-54-10703. Unknown Photographer, 5/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  14. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  15. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  16. Blue Origin Facility - Construction Progress

    NASA Image and Video Library

    2017-03-21

    Construction is progressing on Blue Origin's 750,000-square-foot facility being built at Exploration Park on NASA Kennedy Space Center property in Florida. Blue Origin will use the factory to manufacture its two-stage super-heavy-lift New Glenn launch vehicle and launch the vehicles from Space Launch Complex 46 at Cape Canaveral Air Force Station.

  17. Service-Learning: A Catalyst for Constructing Democratic Progressive Communities.

    ERIC Educational Resources Information Center

    Varlotta, Lori E.

    1996-01-01

    Argues that higher education's traditional "closed" communities contrast sharply with democratic progressive ones that are more inclusive, empowering, and diverse. Drawing on feminism and postmodernism, demonstrates why service-learning is well suited to connect relational, experiential, and constructive epistemologies with democratic progressive…

  18. CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-885. Unknown Photographer, 10/30/1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  19. AERIAL VIEW OF MAIN PROCESSING BUILDING SHOWING CONSTRUCTION PROGRESS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL VIEW OF MAIN PROCESSING BUILDING SHOWING CONSTRUCTION PROGRESS AND EXCAVATION FOR LABORATORY ON LEFT. INL PHOTO NUMBER NRTS-51-1759. Unknown Photographer, 3/28/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  20. CONSTRUCTION PROGRESS PHOTO SHOWING EMPLACEMENT STEEL BEAMS FUEL STORAGE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING EMPLACEMENT STEEL BEAMS FUEL STORAGE BUILDING (CPP-603) LOOKING EAST. INL PHOTO NUMBER NRTS-51-1371. Unknown Photographer, 1/31/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING PLACEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING PLACEMENT OF PIERS. INL PHOTO NUMBER NRTS-54-11716. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  2. Pad 39B Flame Trench Brick Work

    NASA Image and Video Library

    2016-10-26

    Progress continues on the new flame trench at Launch Pad 39B at NASA's Kennedy Space Center in Florida. Construction workers with J.P. Donovan of Rockledge, Florida, are on an elevated work stand to install new heat-resistant bricks on the north side of the flame trench. The Pad B flame trench is being refurbished to support the launch of NASA’s Space Launch System rocket. The Ground Systems Development and Operations (GSDO) Program at Kennedy is helping transform the space center into a multi-user spaceport and prepare for Exploration Mission 1, deep space missions, and NASA's Journey to Mars. For more information about GSDO, visit: http://www.nasa.gov/groundsystems.

  3. Research on design of cryotransformers and its prospects for the future

    NASA Astrophysics Data System (ADS)

    Lech, W.

    1985-02-01

    Calculation results of the technical-economic parameters of large power cryotransformers with windings of pure aluminum, presented in this paper, indicate that the production of such cryotransformers could be justified and that resumption of the research work in this field would be advisable. On the basis of significant progress in the development of new multifilament superconducting wires it was concluded that the construction of cryotransformers with superconducting windings will become feasible in the near future, and that most likely these windings will operate at the temperature of liquid hydrogen.

  4. THE ARMOUR DUST FUELED REACTOR (ADFR). Quarterly Progress Report No. 1 for the Period February 21, 1958 to May 21, 1958

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loewe, W.E.; Krucoff, D.

    1958-10-31

    Work has begun on the ADFR, a reactor using a new fuel form -- fissionable dust carried in an inent gas. Temperatures in the range 2,000 to 3,000 deg F appear feasible in an all-ceramic system. Experimental study of the fuel form was initiated, and a loop to circulate the fuel dust was constructed. Initial operation is encouraging. Theoretical studies were carried on in the areas of reactor physics, heat transfer, and safety. (auth)

  5. CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP627) SHOWING EMPLACEMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING EMPLACEMENT OF ROOF SLABS. INL PHOTO NUMBER NRTS-54-13463. R.G. Larsen, Photographer, 12/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP640) LOOKING NORTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP-640) LOOKING NORTHWEST SHOWING FORMING AND PLACEMENT OF REINFORCING STEEL FOR SOUTH WALLS OF CELLS 1, 3, 4 AND 5 AND WEST WALL FOR CELLS 1 AND 2; CONSTRUCTION 13 PERCENT COMPLETE. INL PHOTO NUMBER NRTS 59-6436. J. Anderson, Photographer, 12/18/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  7. Nano-Aptasensing in Mycotoxin Analysis: Recent Updates and Progress

    PubMed Central

    Rhouati, Amina; Bulbul, Gonca; Hayat, Akhtar; Marty, Jean Louis

    2017-01-01

    Recent years have witnessed an overwhelming integration of nanomaterials in the fabrication of biosensors. Nanomaterials have been incorporated with the objective to achieve better analytical figures of merit in terms of limit of detection, linear range, assays stability, low production cost, etc. Nanomaterials can act as immobilization support, signal amplifier, mediator and artificial enzyme label in the construction of aptasensors. We aim in this work to review the recent progress in mycotoxin analysis. This review emphasizes on the function of the different nanomaterials in aptasensors architecture. We subsequently relate their features to the analytical performance of the given aptasensor towards mycotoxins monitoring. In the same context, a critically analysis and level of success for each nano-aptasensing design will be discussed. Finally, current challenges in nano-aptasensing design for mycotoxin analysis will be highlighted. PMID:29143760

  8. Around Marshall

    NASA Image and Video Library

    1980-05-06

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. As part of this experimentation, the Experimental Assembly of Structures in Extravehicular Activity (EASE) project was developed as a joint effort between MFSC and the Massachusetts Institute of Technology (MIT). The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle. Pictured is an entire unit that has been constructed and is sitting in the bottom of a mock-up shuttle cargo bay pallet.

  9. Full Speed Ahead for Eso's Very Large Telescope First Enclosure on its way to PARANAL!

    NASA Astrophysics Data System (ADS)

    1994-09-01

    During the past months, vast progress has been made in the construction of ESO's 16-metre equivalent Very Large Telescope (VLT). This major scientific and technological project aims at installing the world's largest optical telescope in the form of four interconnected telescopes with 8.2-metre mirrors on the Paranal mountain in the Chilean Atacama desert. It continues to be on schedule as it heads towards its completion, just after the year 2000. An important milestone will be reached in early October 1994 when the first large shipment containing heavy steel parts of the enclosure for VLT Unit Telescope no. 1 leaves the Italian port of Genova [1]. Meanwhile the construction work on the Paranal site is also progressing very well. It is now expected that, as planned, the first enclosure will be ready in May 1995 to receive the first 8.2-metre telescope. This Press Release is accompanied by four colour pictures that illustrate some of the most recent developments. CONSTRUCTION PROGRESS IN EUROPE Considerable progress has been made by ESO's industrial partners in Europe, and the VLT Project has now entered into a new and dynamic phase of construction. The first 8.2-metre mirror is currently in the middle of a two-year polishing process at the REOSC company near Paris, and the first interferometric tests have shown that this very delicate operation is progressing well. The enormous mirror surface, with a total area of more than 50 m^2, is slowly but steadily approaching the desired shape which must be achieved within a few hundred-thousandths of one millimetre over the entire surface. Mirror blank no. 2 is now ready at the Schott factory in Mainz (Germany) and will be delivered by barge transport to REOSC in October 1994. Blank no. 3 has successfully completed the critical ceramization phase and blank no. 4 will soon receive the same treatment. The circular steel track, 18 metres in diameter, that will support Telescope no. 1 has now been successfully machined at the Ansaldo factory in Genova (Italy). The substructure on which this track and the complete telescope steel structure will be pre-erected before shipment to Chile was constructed at the Ansaldo factory in Milan. Elements of the telescope fork structure were also welded and machined here. In addition, many of the subsystems of the telescope tube, motors and encoders are now in an advanced phase of manufacture. The full integration of the first telescope will take place in Milan during the test-assembly phase in the first half of 1995. It will then for the first time be possible to fully appreciate the enormous size of this structure. All structural elements for the complex enclosure that will protect Telescope no. 1 have now been machined at IDROMACCHINE in Mestre near Venice. It was decided to perform a pre-erection assembly there of a few critical parts in order to test thoroughly performances and interfaces. THE FIRST SHIPMENT At the beginning of October 1994, the first shipment of steel parts of this enclosure with a total weight of more than 100 tons will leave Europe for the sea journey to Chile. While the smaller parts are packed in large containers, special packing is necessary for the very large structures. The ship will depart from the port of Genova and is expected to dock in Antofagasta towards the end of November 1994, after which the parts will be transported by truck to the top of Paranal. This first shipment will be soon be followed by others; it is expected that consignments of about 100 tons each will be sent to Chile every two weeks over the next eight months. WORK AT PARANAL PROGRESSES RAPIDLY Meanwhile, the construction work on the top of Paranal continues at full speed. About 350 people employed by the construction firm SKANSKA/Belfi now live in the completed base camp and work in shifts day and night on the mountain. The photos accompanying this Press Release show the state of the extensive work by mid-September. The tunneling for the many underground passages is finished, the concrete base for Telescope no. 1 is nearing completion, and the baseplate for no. 2 is ready. The aerial view gives a vivid impression of well-organised "chaos" now reigning at Paranal and it is hard to believe that when this phase is over, supposedly towards the end of 1996, only the four telescope enclosures will be seen on the completely flat mountain platform -- all other infrastructures, including the large interferometric laboratories, will again have been completely covered. This is necessary to ensure the best possible wind-flow pattern over and around the mountain and enclosures and thereby also allow the sharpest possible astronomical images to be obtained with the giant telescopes. The anti-seismic supports to be embedded in the foundations for protection against the strongest earthquakes, have already arrived in Chile and will be installed below enclosure no. 1 during the next few weeks. It is then intended to start the erection of the major parts of this enclosure in mid-December 1994, immediately following the termination of the construction of the concrete support. This work will start with the assembly of the lower, fixed part of the structure that carries the circular track on which the upper part rotates. It is expected that this will last about six months and that the first enclosure will be ready in May 1995. The erection of enclosure no. 2 will begin immediately afterwards and will be followed by nos. 3 and 4. This work should be terminated by the end of 1996. THE NEXT STEPS The heavy parts for Telescope no. 1 will arrive at Paranal shortly after May 1995. However, before the telescope assembly inside the enclosure can begin, a rotating coude platform will have to be installed below, directly on the base plate that will also carry the entire telescope structure above. The lower telescope structure will then be built on top of the two circular tracks and later the telescope tube will be attached at the top. Then follows the installation of the optics, including the 8.2-metre main mirror and the first astronomical instruments. Then arrives the long-awaited moment when the telescope will open its giant eye towards the Universe for the first time; astronomers refer to this special event as "first light". Finally, the telescope will be thoroughly tested, before it is made generally available to the astronomers. This will probably happen about three years from now, in late 1997. The other three telescopes will be installed during the following years. [1] See ESO Press Release 13/94 of 9 August 1994.

  10. Assessing Learning Progression of Energy Concepts across Middle School Grades: The Knowledge Integration Perspective

    ERIC Educational Resources Information Center

    Lee, Hee-Sun; Liu, Ou Lydia

    2010-01-01

    We use a construct-based assessment approach to measure learning progression of energy concepts across physical, life, and earth science contexts in middle school grades. We model the knowledge integration construct in six levels in terms of the numbers of ideas and links used in student-generated explanations. For this study, we selected 10 items…

  11. The "Don't Know" Option in Progress Testing

    ERIC Educational Resources Information Center

    Ravesloot, C. J.; Van der Schaaf, M. F.; Muijtjens, A. M. M.; Haaring, C.; Kruitwagen, C. L. J. J.; Beek, F. J. A.; Bakker, J.; Van Schaik, J.P.J.; Ten Cate, Th. J.

    2015-01-01

    Formula scoring (FS) is the use of a don't know option (DKO) with subtraction of points for wrong answers. Its effect on construct validity and reliability of progress test scores, is subject of discussion. Choosing a DKO may not only be affected by knowledge level, but also by risk taking tendency, and may thus introduce construct-irrelevant…

  12. Correlation of physical and genetic maps of human chromosome 16. Annual progress report, October 1, 1990--July 31, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sutherland, G.R.

    1991-12-31

    This project aimed to divide chromosome 16 into approximately 50 intervals of {approximately}2Mb in size by constructing a series of mouse/human somatic cell hybrids each containing a rearranged chromosome 16. Using these hybrids, DNA probes would be regionally mapped by Southern blot or PCR analysis. Preference would be given to mapping probes which demonstrated polymorphisms for which the CEPH panel of families had been typed. This would allow a correlation of the physical and linkage maps of this chromosome. The aims have been substantially achieved. 49 somatic cell hybrids have been constructed which have allowed definition of 46, and potentiallymore » 57, different physical intervals on the chromosome. 164 loci have been fully mapped into these intervals. A correlation of the physical and genetic maps of the chromosome is in an advanced stage of preparation. The somatic cell hybrids constructed have been widely distributed to groups working on chromosome 16 and other genome projects.« less

  13. Significant Work Is About Self-Realization and Broader Purpose: Defining the Key Dimensions of Meaningful Work.

    PubMed

    Martela, Frank; Pessi, Anne B

    2018-01-01

    Research on meaningful work has proliferated in recent years, with an increasing understanding of the centrality of meaningfulness for work-related motivation, commitment, and well-being. However, ambiguity around the main construct, "meaningful work," has hindered this progress as various researchers have used partly overlapping, partly differing conceptualizations. To bring clarity to this issue, we examine a broad range of various definitions of meaningful work and come to argue that meaningfulness in the broadest sense is about work significance as an overall evaluation of work as regards whether it is intrinsically valuable and worth doing. Furthermore, we argue that there are two key sub-dimensions to this work significance: Broader purpose as work serving some greater good or prosocial goals (the intrinsic value of work beyond the person in question). And self-realization as a sense of autonomy, authenticity and self-expression at work (the intrinsic value of work for the person in question). Previous definitions of meaningful work feature typically one or two of these elements-significance, broader purpose, self-realization -, but in the future it would be beneficial to clearly acknowledge all three elements in both definitions and operationalizations of meaningful work.

  14. Significant Work Is About Self-Realization and Broader Purpose: Defining the Key Dimensions of Meaningful Work

    PubMed Central

    Martela, Frank; Pessi, Anne B.

    2018-01-01

    Research on meaningful work has proliferated in recent years, with an increasing understanding of the centrality of meaningfulness for work-related motivation, commitment, and well-being. However, ambiguity around the main construct, “meaningful work,” has hindered this progress as various researchers have used partly overlapping, partly differing conceptualizations. To bring clarity to this issue, we examine a broad range of various definitions of meaningful work and come to argue that meaningfulness in the broadest sense is about work significance as an overall evaluation of work as regards whether it is intrinsically valuable and worth doing. Furthermore, we argue that there are two key sub-dimensions to this work significance: Broader purpose as work serving some greater good or prosocial goals (the intrinsic value of work beyond the person in question). And self-realization as a sense of autonomy, authenticity and self-expression at work (the intrinsic value of work for the person in question). Previous definitions of meaningful work feature typically one or two of these elements—significance, broader purpose, self-realization –, but in the future it would be beneficial to clearly acknowledge all three elements in both definitions and operationalizations of meaningful work. PMID:29632502

  15. Structural Load Alleviation Applied to Next Generation Aircraft and Wind Turbines

    NASA Technical Reports Server (NTRS)

    Frost, Susan

    2011-01-01

    Reducing the environmental impact of aviation is a goal of the Subsonic Fixed Wing Project under the Fundamental Aeronautics Program of NASAs Aeronautics Research Mission Directorate. Environmental impact of aviation is being addressed by novel aircraft configurations and materials that reduce aircraft weight and increase aerodynamic efficiency. NASA is developing tools to address the challenges of increased airframe flexibility created by wings constructed with reduced structural material and novel light-weight materials. This talk will present a framework and demonstration of a flight control system using optimal control allocation with structural load feedback and constraints to achieve safe aircraft operation. As wind turbines age, they become susceptible to many forms of blade degradation. Results will be presented on work in progress that uses adaptive contingency control for load mitigation in a wind turbine simulation with blade damage progression modeled.

  16. An Engineering Report in Civil Engineering and Management.

    DTIC Science & Technology

    1987-12-01

    programs as the Apollo program and the Canaveral program. Progress in the late 70s and the 80s has seen advancements in the application of sophisticated...other forces in military operations; subsequent combat service support ashore and defense against overt or clandestine enemy attacks directed toward...construction execution plans; assigns construction projects to NCF units; monitors progress and assures adherence to quality standards: directs

  17. Construct Validity and Measurement Invariance of Computerized Adaptive Testing: Application to Measures of Academic Progress (MAP) Using Confirmatory Factor Analysis

    ERIC Educational Resources Information Center

    Wang, Shudong; McCall, Marty; Jiao, Hong; Harris, Gregg

    2012-01-01

    The purposes of this study are twofold. First, to investigate the construct or factorial structure of a set of Reading and Mathematics computerized adaptive tests (CAT), "Measures of Academic Progress" (MAP), given in different states at different grades and academic terms. The second purpose is to investigate the invariance of test…

  18. Constructing Memory, Imagination, and Empathy: A Cognitive Neuroscience Perspective

    PubMed Central

    Gaesser, Brendan

    2012-01-01

    Studies on memory, imagination, and empathy have largely progressed in isolation. Consequently, humans’ empathic tendencies to care about and help other people are considered independent of our ability to remember and imagine events. Despite this theoretical autonomy, work from across psychology, and neuroscience suggests that these cognitive abilities may be linked. In the present paper, I tentatively propose that humans’ ability to vividly imagine specific events (as supported by constructive memory) may facilitate prosocial intentions and behavior. Evidence of a relationship between memory, imagination, and empathy comes from research that shows imagination influences the perceived and actual likelihood an event occurs, improves intergroup relations, and shares a neural basis with memory and empathy. Although many questions remain, this paper outlines a new direction for research that investigates the role of imagination in promoting empathy and prosocial behavior. PMID:23440064

  19. Mitigating delay and non-payment in the Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Mohamad, N.; Suman, A. S.; Harun, H.; Hashim, H.

    2018-02-01

    Construction industry is one of the industries that have contributed towards the rapid growth of development and economics in Malaysia. However, the industry is inundated with delay and non-payment issues between the two parties in contract that is the clients and contractors Even though there are contractual and administrative provisions in the standard forms of contract in Malaysia regarding payments, delay and non-payment issues still occur between them. The aim of the study is to develop measures to mitigate delay and non-payment issues between contractors and clients in the Malaysian construction industry. Questionnaire survey was conducted with clients and contractors in Klang Valley. Results from data analysis identified significant measures to mitigate delay and non-payment issues between contractors and clients which include contractors should submit their progress work invoicing with adequate documents; contractors should follow up constantly with client regarding payment; proper understanding of requirements with regards to payment; mutual discussion of problems with client to address problems in a timely manner and proper use of payment provisions in the standard form of contract. This study is significant to contractors and clients and to other construction players in order to reduce and minimise delay and non-payment issues for the growth of economy in the Malaysian construction industry.

  20. Neutral Buoyancy Simulator-NB32-Assembly of Large Space Structure

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, theprospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA's Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Pictured is a Massachusetts Institute of Technology (MIT) student working in a spacesuit on the Experimental Assembly of Structures in Extravehicular Activity (EASE) project which was developed as a joint effort between MFSC and MIT. The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle. The MIT student in this photo is assembling two six-beam tetrahedrons.

  1. Around Marshall

    NASA Image and Video Library

    1980-01-07

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA's Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Pictured is a Massachusetts Institute of Technology (MIT) student working in a spacesuit on the Experimental Assembly of Structures in Extravehicular Activity (EASE) project which was developed as a joint effort between MFSC and MIT. The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle. The MIT student in this photo is assembling two six-beam tetrahedrons.

  2. Around Marshall

    NASA Image and Video Library

    1980-02-27

    Once the United States' space program had progressed from Earth's orbit into outerspace, theprospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA's Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Pictured is a Massachusetts Institute of Technology (MIT) student working in a spacesuit on the Experimental Assembly of Structures in Extravehicular Activity (EASE) project which was developed as a joint effort between MFSC and MIT. The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle. The MIT student in this photo is assembling two six-beam tetrahedrons.

  3. Around Marshall

    NASA Image and Video Library

    1980-07-08

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Pictured is a Massachusetts Institute of Technology (MIT) student working in a spacesuit on the Experimental Assembly of Structures in Extravehicular Activity (EASE) project which was developed as a joint effort between MFSC and MIT. The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle.

  4. 7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE BUNKER. SHOWS OPENING TO CABLE CHASE, FOUR PULLEY DEVICES, POWER OUTLET, CONDUIT, AND EAST END WALL OF BUNKER. INEL PHOTO NUMBER 65-5441, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  5. Experimenting with theoretical motor neuroscience.

    PubMed

    Ajemian, Robert; Hogan, Neville

    2010-11-01

    Motor neuroscience is well over 100 years old, with seminal work such as G. T. Fritz and E. Hitzig's discovery of motor cortex occurring in 1870. Theoretical motor neuroscience has been ongoing for at least the last 50 years. How mature a scientific discipline is motor neuroscience? Are experimentalists and theoreticians working together productively to help the field progress? This article addresses these questions by advancing the following theses. Motor neuroscience remains at a descriptive stage due to the incredible complexity of the problem to be solved. The proliferation of models--and distinct modeling camps--stems from the absence of unifying conceptual constructs. To advance the field, theoreticians must rely more heavily on the concept of falsification by producing models that lend themselves to clear experimental testing.

  6. Building a Learning Progression for Celestial Motion: An Exploration of Students' Reasoning about the Seasons

    ERIC Educational Resources Information Center

    Plummer, Julia D.; Maynard, L.

    2014-01-01

    We present the development of a construct map addressing the reason for the seasons, as a subset of a larger learning progression on celestial motion. Five classes of 8th grade students (N?=?38) participated in a 10-day curriculum on the seasons. We revised a hypothetical seasons construct map using a Rasch model analysis of students'…

  7. LOD BIM Element specification for Railway Turnout Systems Risk Mitigation using the Information Delivery Manual

    NASA Astrophysics Data System (ADS)

    Gigante-Barrera, Ángel; Dindar, Serdar; Kaewunruen, Sakdirat; Ruikar, Darshan

    2017-10-01

    Railway turnouts are complex systems designed using complex geometries and grades which makes them difficult to be managed in terms of risk prevention. This feature poses a substantial peril to rail users as it is considered a cause of derailment. In addition, derailment deals to financial losses due to operational downtimes and monetary compensations in case of death or injure. These are fundamental drivers to consider mitigating risks arising from poor risk management during design. Prevention through design (PtD) is a process that introduces tacit knowledge from industry professionals during the design process. There is evidence that Building Information Modelling (BIM) can help to mitigate risk since the inception of the project. BIM is considered an Information System (IS) were tacit knowledge can be stored and retrieved from a digital database making easy to take promptly decisions as information is ready to be analysed. BIM at the model element level entails working with 3D elements and embedded data, therefore adding a layer of complexity to the management of information along the different stages of the project and across different disciplines. In order to overcome this problem, the industry has created a framework for model progression specification named Level of Development (LOD). The paper presents an IDM based framework for design risk mitigation through code validation using the LOD. This effort resulted on risk datasets which describe graphically and non-graphically a rail turnout as the model progresses. Thus, permitting its inclusion within risk information systems. The assignment of an LOD construct to a set of data, requires specialised management and process related expertise. Furthermore, the selection of a set of LOD constructs requires a purpose based analysis. Therefore, a framework for LOD constructs implementation within the IDM for code checking is required for the industry to progress in this particular field.

  8. 48 CFR 852.236-84 - Schedule of work progress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Schedule of work progress... Schedule of work progress. As prescribed in 836.575, insert the following clause: Schedule of Work Progress... indicates the anticipated installation of work versus the elapsed contract time, for the approval of the...

  9. [Injuries: preventive approach and progress of injuries in the construction of the line B1 of the underground of Rome].

    PubMed

    Saggio, G; Conti, E; Valentini, F; De Sio, L; Capano, M Perrone

    2010-01-01

    The line B1 is a branch of the existing Metro line B in Rome. The route is long about 5 km, is completely underground and involves the construction of four new stations: Annibaliano, Libia /Gondar, Conca d'Oro and Jonio. The line will have a capacity of transport of 24,000 people/hour in each direction. The works started in 2006 involve about 500 workers. The report provides a statistical analysis of the events that occurred in the period 2005/2010 and aims to introduce the starting and management of this study, also on the basis of the "Operating procedures" issued by the acquisition of OSHAS 18001 certification from the agent of Metro B) / R.I.M.A.T.I. This analysis aims to provide to supervisors, to social security institutions and to workers, a usefull analysis tool in the prevention of the monitored events.

  10. Rethinking Sexual Citizenship

    PubMed Central

    Richardson, Diane

    2016-01-01

    Over the last two decades sexuality has emerged as a key theme in debates about citizenship, leading to the development of the concept of sexual citizenship. This article reviews this literature and identifies four main areas of critical framing: work that contests the significance of sexuality to citizenship; critiques that focus on the possibilities and limitations of mobilising the language of citizenship in sexual politics; analyses of sexual citizenship in relation to nationalisms and border making; and literature that critically examines western constructions of sexuality and sexual politics underpinning understandings of sexual citizenship. In order to progress the field theoretically, the article seeks to extend critiques of sexual citizenship focusing on two key aspects of its construction: the sexual citizen-subject and spaces of sexual citizenship. It argues for a critical rethink that encompasses a de-centring of a ‘western-centric’ focus in order to advance understandings of how sexual citizenship operates both in the Global North and South. PMID:28490816

  11. Impact of reduced working time on surgical training in the United Kingdom and Ireland.

    PubMed

    Canter, Richard

    2011-01-01

    The European Working Time Directive (EWTD) 48 h working week has been law in European countries since 1998. A phased approach to implementation was agreed for doctors in training, which steadily brought down working hours to 58 in 2004, 56 in 2007 and 48 in 2009. Medical trainees can "opt out" to a 54 h working week but this has to be voluntary and rotas cannot be constructed that assume an opt out is taking place. A key component of the working week arrangements is that the maximum period of work for a resident doctor without rest is 13 h. Shorter sessions of work have led to complex rotas, frequent handovers with difficulties maintaining continuity of care with implications for patient safety. Although there has been over 10 years notice of the changes to the working week and progress has up to now been reasonable (helped, in part by a steady increase in consultant numbers) this latest reduction from 56 h to 48 h seems to have been the most difficult to manage. Copyright © 2010 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  12. Progress of the Felsenkeller Shallow-Underground Accelerator for Nuclear Astrophysics

    NASA Astrophysics Data System (ADS)

    Bemmerer, D.; Cavanna, F.; Cowan, T. E.; Grieger, M.; Hensel, T.; Junghans, A. R.; Ludwig, F.; Müller, S. E.; Rimarzig, B.; Reinicke, S.; Schulz, S.; Schwengner, R.; Stöckel, K.; Szücs, T.; Takács, M. P.; Wagner, A.; Wagner, L.; Zuber, K.

    Low-background experiments with stable ion beams are an important tool for putting the model of stellar hydrogen, helium, and carbon burning on a solid experimental foundation. The pioneering work in this regard has been done by the LUNA collaboration at Gran Sasso, using a 0.4 MV accelerator. In the present contribution, the status of the project for a higher-energy underground accelerator is reviewed. Two tunnels of the Felsenkeller underground site in Dresden, Germany, are currently being refurbished for the installation of a 5 MV high-current Pelletron accelerator. Construction work is on schedule and expected to complete in August 2017. The accelerator will provide intense, 50 µA, beams of 1H+, 4He+, and 12C+ ions, enabling research on astrophysically relevant nuclear reactions with unprecedented sensitivity.

  13. Superlative TINs

    NASA Technical Reports Server (NTRS)

    Chamberlin, R.

    2002-01-01

    TIN is short for 'triangulated irregular network,' which is a piecewise planar model of a surface. If properly constructed, a TIN can be more than 30 times as efficient as a regular triangulation. In our project (a ground combat simulation to support U.S. Army training exercises), the TIN is used to represent the Earth's surface and is used primarily to determine whether line of sight is blocked by terrain. High efficiency requires accurate identification of ridgelines with as few triangles as possible. The work currently in progress is the implementation of a TINning process that we hope will produce superlative TINs. This presentation describes that process.

  14. Around Marshall

    NASA Image and Video Library

    1978-08-24

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Another facet of the space station would be electrical cornectors which would be used for powering tools the astronauts would need for construction, maintenance and repairs. Shown is an astronaut training during an underwater electrical connector test in the NBS.

  15. Emulytics for Cyber-Enabled Physical Attack Scenarios: Interim LDRD Report of Year One Results.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clem, John; Urias, Vincent; Atkins, William Dee

    Sandia National Laboratories has funded the research and development of a new capability to interactively explore the effects of cyber exploits on the performance of physical protection systems. This informal, interim report of progress summarizes the project’s basis and year one (of two) accomplishments. It includes descriptions of confirmed cyber exploits against a representative testbed protection system and details the development of an emulytics capability to support live, virtual, and constructive experiments. This work will support stakeholders to better engineer, operate, and maintain reliable protection systems.

  16. COMPONENTS FOR SCHOOL CONSTRUCTION IN THE MID-HUDSON REGION. PROGRESS REPORT 1.

    ERIC Educational Resources Information Center

    GREEN, ALAN C.; AND OTHERS

    THIS REPORT IS PART 1 OF A FEASIBILITY STUDY TO SAMPLE APPROPRIATE ASPECTS OF THE SCHOOL CONSTRUCTION FACTORS IN NEW YORK STATE. THE STUDY IS TO DETERMINE WHETHER THE SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROCESS IS APPLICABLE TO SCHOOL CONSTRUCTION IN THE MID-HUDSON VALLEY. THE STUDY ALSO EXPLORES POSSIBLE MEANS BY WHICH SUCH SCHOOL BUILDINGS…

  17. The Work Ability of Hong Kong Construction Workers in Relation to Individual and Work-Related Factors.

    PubMed

    Ng, Jacky Y K; Chan, Alan H S

    2018-05-14

    The shortage in Hong Kong of construction workers is expected to worsen in future due to the aging population and increasing construction activity. Construction work is dangerous and to help reduce the premature loss of construction workers due to work-related disabilities, this study measured the work ability of 420 Hong Kong construction workers with a Work Ability Index (WAI) which can be used to predict present and future work performance. Given the importance of WAI, in this study the effects of individual and work-related factors on WAI were examined to develop and validate a WAI model to predict how individual and work-related factors affect work ability. The findings will be useful for formulating a pragmatic intervention program to improve the work ability of construction workers and keep them in the work force.

  18. Health hazard evaluation report HETA 84-437-1532, Perry Nuclear Power Plant, Perry, Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moseley, C.L.

    1984-11-01

    Breathing-zone samples were analyzed for iron, zinc, lead, nickel, and chromium fumes, quartz, cristobalite, and respirable particulates during construction of the Perry Nuclear Power facility, Perry, Ohio in August, 1984. The survey was requested by Local 210 of the Pipefitters Union to evaluate exposure of airborne contaminants to construction workers at the facility. All metal fume and respirable particulates were well below the relevant standards. The author notes that NIOSH conducted two previous surveys at the site and the concentrations of all contaminants have decreased since work has progressed at the facility. The quartz overexposure is due to residual constructionmore » dust. Each contractor should assume responsibility for the health and safety of his employees. Break areas should be vacuumed daily. Good housekeeping practices should be maintained in all areas to prevent exposure to quartz dust.« less

  19. Photon-Weighted Midpoint Exposure Meter for Keck/HIRES Extrasolar Planet Research

    NASA Technical Reports Server (NTRS)

    1999-01-01

    NASA Grant was received for research involving the construction of a photon-weighting midpoint exposure meter for the Keck HIRES spectrometer, and for support of our NASA/Keck-based planet research with this instrumentation. The research funds were also to be used to make our iodine cell calibration system and exposure meter available to the NASA Keck observing community. Progress this past year, the second of the 3-year granting period, involved work in 4 areas: 1) Further construction of the midpoint exposure meter. 2) Assisting observers with use of the Iodine system. 3) Acquisition of precision radial velocity data on our program star sample with continued monitoring to proceed in subsequent years as available telescope time permits. 4) Reduction and analysis of incoming precision radial velocity data to reject problematic and uninteresting program stars, and to identify promising planet candidates.

  20. Hemispherical array of sensors with contractively wrapped polymer petals for flow sensing

    NASA Astrophysics Data System (ADS)

    Kanhere, Elgar; Wang, Nan; Kottapalli, Ajay Giri Prakash; Miao, Jianmin; Triantafyllou, Michael

    2017-11-01

    Hemispherical arrays have inherent advantages that allow simultaneous detection of flow speed and direction due to their shape. Though MEMS technology has progressed leaps and bounds, fabrication of array of sensors on a hemispherical surface is still a challenge. In this work, a novel approach of constructing hemispherical array is presented which employs a technique of contractively wrapping a hemispherical surface with flexible liquid crystal polymer petals. This approach also leverages the offerings from rapid prototyping technology and established standard MEMS fabrication processes. Hemispherical arrays of piezoresistive sensors are constructed with two types of petal wrappings, 4-petals and 8-petals, on a dome. The flow sensing and direction detection abilities of the dome are evaluated through experiments in wind tunnel. Experimental results demonstrate that a dome equipped with a dense array of sensors can provide information pertaining to the stimulus, through visualization of output profile over the entire surface.

  1. 5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND LOWER FUEL ELEMENTS. TAKEN FROM TOP OF SHIELDING TANK WITH CAMERA POINTING TOWARDS BOTTOM OF TANK. SHOWS LADDER, SQUARE LIFTING FRAME, FUEL ELEMENT HOLDERS, AND CABLE CYLINDERS. INEL PHOTO NUMBER 65-5434, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  2. Effective organizational solutions for implementation of DBMS software packages

    NASA Technical Reports Server (NTRS)

    Jones, D.

    1984-01-01

    The space telescope management information system development effort is a guideline for discussing effective organizational solutions used in implementing DBMS software. Focus is on the importance of strategic planning. The value of constructing an information system architecture to conform to the organization's managerial needs, the need for a senior decision maker, dealing with shifting user requirements, and the establishment of a reliable working relationship with the DBMS vendor are examined. Requirements for a schedule to demonstrate progress against a defined timeline and the importance of continued monitoring for production software control, production data control, and software enhancements are also discussed.

  3. Endogenous molecular network reveals two mechanisms of heterogeneity within gastric cancer.

    PubMed

    Li, Site; Zhu, Xiaomei; Liu, Bingya; Wang, Gaowei; Ao, Ping

    2015-05-30

    Intratumor heterogeneity is a common phenomenon and impedes cancer therapy and research. Gastric cancer (GC) cells have generally been classified into two heterogeneous cellular phenotypes, the gastric and intestinal types, yet the mechanisms of maintaining two phenotypes and controlling phenotypic transition are largely unknown. A qualitative systematic framework, the endogenous molecular network hypothesis, has recently been proposed to understand cancer genesis and progression. Here, a minimal network corresponding to such framework was found for GC and was quantified via a stochastic nonlinear dynamical system. We then further extended the framework to address the important question of intratumor heterogeneity quantitatively. The working network characterized main known features of normal gastric epithelial and GC cell phenotypes. Our results demonstrated that four positive feedback loops in the network are critical for GC cell phenotypes. Moreover, two mechanisms that contribute to GC cell heterogeneity were identified: particular positive feedback loops are responsible for the maintenance of intestinal and gastric phenotypes; GC cell progression routes that were revealed by the dynamical behaviors of individual key components are heterogeneous. In this work, we constructed an endogenous molecular network of GC that can be expanded in the future and would broaden the known mechanisms of intratumor heterogeneity.

  4. Endogenous molecular network reveals two mechanisms of heterogeneity within gastric cancer

    PubMed Central

    Li, Site; Zhu, Xiaomei; Liu, Bingya; Wang, Gaowei; Ao, Ping

    2015-01-01

    Intratumor heterogeneity is a common phenomenon and impedes cancer therapy and research. Gastric cancer (GC) cells have generally been classified into two heterogeneous cellular phenotypes, the gastric and intestinal types, yet the mechanisms of maintaining two phenotypes and controlling phenotypic transition are largely unknown. A qualitative systematic framework, the endogenous molecular network hypothesis, has recently been proposed to understand cancer genesis and progression. Here, a minimal network corresponding to such framework was found for GC and was quantified via a stochastic nonlinear dynamical system. We then further extended the framework to address the important question of intratumor heterogeneity quantitatively. The working network characterized main known features of normal gastric epithelial and GC cell phenotypes. Our results demonstrated that four positive feedback loops in the network are critical for GC cell phenotypes. Moreover, two mechanisms that contribute to GC cell heterogeneity were identified: particular positive feedback loops are responsible for the maintenance of intestinal and gastric phenotypes; GC cell progression routes that were revealed by the dynamical behaviors of individual key components are heterogeneous. In this work, we constructed an endogenous molecular network of GC that can be expanded in the future and would broaden the known mechanisms of intratumor heterogeneity. PMID:25962957

  5. A gene-signature progression approach to identifying candidate small-molecule cancer therapeutics with connectivity mapping.

    PubMed

    Wen, Qing; Kim, Chang-Sik; Hamilton, Peter W; Zhang, Shu-Dong

    2016-05-11

    Gene expression connectivity mapping has gained much popularity recently with a number of successful applications in biomedical research testifying its utility and promise. Previously methodological research in connectivity mapping mainly focused on two of the key components in the framework, namely, the reference gene expression profiles and the connectivity mapping algorithms. The other key component in this framework, the query gene signature, has been left to users to construct without much consensus on how this should be done, albeit it has been an issue most relevant to end users. As a key input to the connectivity mapping process, gene signature is crucially important in returning biologically meaningful and relevant results. This paper intends to formulate a standardized procedure for constructing high quality gene signatures from a user's perspective. We describe a two-stage process for making quality gene signatures using gene expression data as initial inputs. First, a differential gene expression analysis comparing two distinct biological states; only the genes that have passed stringent statistical criteria are considered in the second stage of the process, which involves ranking genes based on statistical as well as biological significance. We introduce a "gene signature progression" method as a standard procedure in connectivity mapping. Starting from the highest ranked gene, we progressively determine the minimum length of the gene signature that allows connections to the reference profiles (drugs) being established with a preset target false discovery rate. We use a lung cancer dataset and a breast cancer dataset as two case studies to demonstrate how this standardized procedure works, and we show that highly relevant and interesting biological connections are returned. Of particular note is gefitinib, identified as among the candidate therapeutics in our lung cancer case study. Our gene signature was based on gene expression data from Taiwan female non-smoker lung cancer patients, while there is evidence from independent studies that gefitinib is highly effective in treating women, non-smoker or former light smoker, advanced non-small cell lung cancer patients of Asian origin. In summary, we introduced a gene signature progression method into connectivity mapping, which enables a standardized procedure for constructing high quality gene signatures. This progression method is particularly useful when the number of differentially expressed genes identified is large, and when there is a need to prioritize them to be included in the query signature. The results from two case studies demonstrate that the approach we have developed is capable of obtaining pertinent candidate drugs with high precision.

  6. Method and system for progressive mesh storage and reconstruction using wavelet-encoded height fields

    NASA Technical Reports Server (NTRS)

    Baxes, Gregory A. (Inventor); Linger, Timothy C. (Inventor)

    2011-01-01

    Systems and methods are provided for progressive mesh storage and reconstruction using wavelet-encoded height fields. A method for progressive mesh storage includes reading raster height field data, and processing the raster height field data with a discrete wavelet transform to generate wavelet-encoded height fields. In another embodiment, a method for progressive mesh storage includes reading texture map data, and processing the texture map data with a discrete wavelet transform to generate wavelet-encoded texture map fields. A method for reconstructing a progressive mesh from wavelet-encoded height field data includes determining terrain blocks, and a level of detail required for each terrain block, based upon a viewpoint. Triangle strip constructs are generated from vertices of the terrain blocks, and an image is rendered utilizing the triangle strip constructs. Software products that implement these methods are provided.

  7. Method and system for progressive mesh storage and reconstruction using wavelet-encoded height fields

    NASA Technical Reports Server (NTRS)

    Baxes, Gregory A. (Inventor)

    2010-01-01

    Systems and methods are provided for progressive mesh storage and reconstruction using wavelet-encoded height fields. A method for progressive mesh storage includes reading raster height field data, and processing the raster height field data with a discrete wavelet transform to generate wavelet-encoded height fields. In another embodiment, a method for progressive mesh storage includes reading texture map data, and processing the texture map data with a discrete wavelet transform to generate wavelet-encoded texture map fields. A method for reconstructing a progressive mesh from wavelet-encoded height field data includes determining terrain blocks, and a level of detail required for each terrain block, based upon a viewpoint. Triangle strip constructs are generated from vertices of the terrain blocks, and an image is rendered utilizing the triangle strip constructs. Software products that implement these methods are provided.

  8. The composite complex span: French validation of a short working memory task.

    PubMed

    Gonthier, Corentin; Thomassin, Noémylle; Roulin, Jean-Luc

    2016-03-01

    Most studies in individual differences in the field of working memory research use complex span tasks to measure working memory capacity. Various complex span tasks based on different materials have been developed, and these tasks have proven both reliable and valid; several complex span tasks are often combined to provide a domain-general estimate of working memory capacity with even better psychometric properties. The present work sought to address two issues. Firstly, having participants perform several full-length complex span tasks in succession makes for a long and tedious procedure. Secondly, few complex span tasks have been translated and validated in French. We constructed a French working memory task labeled the Composite Complex Span (CCS). The CCS includes shortened versions of three classic complex span tasks: the reading span, symmetry span, and operation span. We assessed the psychometric properties of the CCS, including test-retest reliability and convergent validity, with Raven's Advanced Progressive Matrices and with an alpha span task; the CCS demonstrated satisfying qualities in a sample of 1,093 participants. This work provides evidence that shorter versions of classic complex span tasks can yield valid working memory estimates. The materials and normative data for the CCS are also included.

  9. The Work Ability of Hong Kong Construction Workers in Relation to Individual and Work-Related Factors

    PubMed Central

    Ng, Jacky Y. K.

    2018-01-01

    The shortage in Hong Kong of construction workers is expected to worsen in future due to the aging population and increasing construction activity. Construction work is dangerous and to help reduce the premature loss of construction workers due to work-related disabilities, this study measured the work ability of 420 Hong Kong construction workers with a Work Ability Index (WAI) which can be used to predict present and future work performance. Given the importance of WAI, in this study the effects of individual and work-related factors on WAI were examined to develop and validate a WAI model to predict how individual and work-related factors affect work ability. The findings will be useful for formulating a pragmatic intervention program to improve the work ability of construction workers and keep them in the work force. PMID:29758018

  10. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    ERIC Educational Resources Information Center

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  11. Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry.

    PubMed

    Tam, Vivian W Y; Tam, Leona; Le, Khoa N

    2010-02-01

    Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that "increasing overall business competitiveness and strategic business opportunities" was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while "rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations" was considered as the major benefit from Australian respondents. However, "lack of clients' support", "increase in management cost" and "increase in documentation workload, such as working documents, procedures and tools" were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, "inclusion of concrete recycling evaluation in tender appraisal" and "defining clear legal evaluation of concrete recycling" were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.

  12. Grounding Zone and Tidal Response of the Amery Ice Shelf, East Antarctica

    NASA Technical Reports Server (NTRS)

    Fricker, Helen A.; Sandwell, David; Coleman, Richard; Minster, Bernard

    2005-01-01

    This report summarizes the main findings of the research project. Unfortunately, it turned out that there was not a great deal of SAR data over the Amery Ice Shelf that we were able to work with on the project; nevertheless, we did make considerable progress on this project, with both the existing SAR data and new field measurements that were collected under this grant. In total we had constructed two SAR interferograms (SSIs), and four SSIs. The latter were combined them to construct two differential SAR interferograms (DSIs;). DSIs are useful because the contribution to the SAR phase from horizontal ice motion is eliminated, since the time difference between the first and second pass within both image pairs used to make the DSI is the same for each pair. The SSIs and DSIs have revealed several interesting glaciological features, and have added to our knowledge of the Amery Ice Shelf (AIS).

  13. Mechanisation and automation technologies development in work at construction sites

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  14. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  15. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  16. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    NASA Astrophysics Data System (ADS)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  17. Neutral Buoyancy Simulator-NB32-Large Space Structure Assembly

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. As part of this experimentation, the Experimental Assembly of Structures in Extravehicular Activity (EASE) project was developed as a joint effort between MFSC and the Massachusetts Institute of Technology (MIT). The EASE experiment required that crew members assemble small components to form larger components, working from the payload bay of the space shuttle. Pictured is an entire unit that has been constructed and is sitting in the bottom of a mock-up shuttle cargo bay pallet.

  18. Why is working memory capacity related to matrix reasoning tasks?

    PubMed

    Harrison, Tyler L; Shipstead, Zach; Engle, Randall W

    2015-04-01

    One of the reasons why working memory capacity is so widely researched is its substantial relationship with fluid intelligence. Although this relationship has been found in numerous studies, researchers have been unable to provide a conclusive answer as to why the two constructs are related. In a recent study, researchers examined which attributes of Raven's Progressive Matrices were most strongly linked with working memory capacity (Wiley, Jarosz, Cushen, & Colflesh, Journal of Experimental Psychology: Learning, Memory, and Cognition, 37, 256-263, 2011). In that study, Raven's problems that required a novel combination of rules to solve were more strongly correlated with working memory capacity than were problems that did not. In the present study, we wanted to conceptually replicate the Wiley et al. results while controlling for a few potential confounds. Thus, we experimentally manipulated whether a problem required a novel combination of rules and found that repeated-rule-combination problems were more strongly related to working memory capacity than were novel-rule-combination problems. The relationship to other measures of fluid intelligence did not change based on whether the problem required a novel rule combination.

  19. Perfusion directed 3D mineral formation within cell-laden hydrogels.

    PubMed

    Sawyer, Stephen William; Shridhar, Shivkumar Vishnempet; Zhang, Kairui; Albrecht, Lucas; Filip, Alex; Horton, Jason; Soman, Pranav

    2018-06-08

    Despite the promise of stem cell engineering and the new advances in bioprinting technologies, one of the major challenges in the manufacturing of large scale bone tissue scaffolds is the inability to perfuse nutrients throughout thick constructs. Here, we report a scalable method to create thick, perfusable bone constructs using a combination of cell-laden hydrogels and a 3D printed sacrificial polymer. Osteoblast-like Saos-2 cells were encapsulated within a gelatin methacrylate (GelMA) hydrogel and 3D printed polyvinyl alcohol (PVA) pipes were used to create perfusable channels. A custom-built bioreactor was used to perfuse osteogenic media directly through the channels in order to induce mineral deposition which was subsequently quantified via microCT. Histological staining was used to verify mineral deposition around the perfused channels, while COMSOL modeling was used to simulate oxygen diffusion between adjacent channels. This information was used to design a scaled-up construct containing a 3D array of perfusable channels within cell-laden GelMA. Progressive matrix mineralization was observed by cells surrounding perfused channels as opposed to random mineral deposition in static constructs. MicroCT confirmed that there was a direct relationship between channel mineralization within perfused constructs and time within the bioreactor. Furthermore, the scalable method presented in this work serves as a model on how large-scale bone tissue replacement constructs could be made using commonly available 3D printers, sacrificial materials, and hydrogels. © 2018 IOP Publishing Ltd.

  20. Tracking the follow-up of work in progress papers.

    PubMed

    Mubin, Omar; Arsalan, Mudassar; Al Mahmud, Abdullah

    2018-01-01

    Academic conferences offer numerous submission tracks to support the inclusion of a variety of researchers and topics. Work in progress papers are one such submission type where authors present preliminary results in a poster session. They have recently gained popularity in the area of Human Computer Interaction (HCI) as a relatively easier pathway to attending the conference due to their higher acceptance rate as compared to the main tracks. However, it is not clear if these work in progress papers are further extended or transitioned into more complete and thorough full papers or are simply one-off pieces of research. In order to answer this we explore self-citation patterns of four work in progress editions in two popular HCI conferences (CHI2010, CHI2011, HRI2010 and HRI2011). Our results show that almost 50% of the work in progress papers do not have any self-citations and approximately only half of the self-citations can be considered as true extensions of the original work in progress paper. Specific conferences dominate as the preferred venue where extensions of these work in progress papers are published. Furthermore, the rate of self-citations peaks in the immediate year after publication and gradually tails off. By tracing author publication records, we also delve into possible reasons of work in progress papers not being cited in follow up publications. In conclusion, we speculate on the main trends observed and what they may mean looking ahead for the work in progress track of premier HCI conferences.

  1. High-Resolution Spectroscopy at the Wyoming Infrared Observatory: Setting TESS Science on FHiRE

    NASA Astrophysics Data System (ADS)

    Jang-Condell, Hannah; Pierce, Michael J.; Pilachowski, C. A.; Kobulnicky, Henry; McLane, Jacob N.

    2018-01-01

    The Fiber High Resolution Echelle (FHiRE) spectrograph is a new instrument designed for the 2.3-m Wyoming InfraRed Observatory (WIRO). With the construction of a vacuum chamber for FHiRE to stabilize the spectrograph and a temperature-stabilized Thorium-Argon lamp for precise velocity calibration, we will be able to achieve 1 m/s RV precision, making it an ideal instrument for finding exoplanets. Details of the design of FHiRE are presented in a companion poster (Pierce et al.). The construction of this instrument is well-timed with the planned 2018 launch of NASA's Transiting Exoplanet Survey Satellite (TESS) mission. TESS will require a great deal of follow-up spectroscopy to characterize potential exoplanet host stars as well as radial velocity measurements to confirm new exoplanets. WIRO is ideally suited to acquire the long-term, high-cadence observations that will be required to make progress in this frontier area of astrophysics. We will coordinate our efforts with the TESS Follow-up Observing Program (TFOP), specifically as part of the Recon Spectroscopy and Precise Radial Velocity Work sub-groups.This work is supported by a grant from NASA EPSCOR.

  2. [The changes in architecture and structure of the European hospital in 20th century].

    PubMed

    Pawlik, Peter R

    From the development of architecture over more than a century we can infer the development of society. Especially in the construction of hospitals reflects social history that is determined by the progress of medical knowledge and techniques. This progress calls for reconsidering and changing conceptions of the construction of hospitals. This paper gives a representative overview of impacts on hospital construction and presents significant, path-breaking projects of the respective time. First it describes the basic principles of hospital construction dating from the 19th century, and then it discusses the influences on modern ways between 1900 and 1945.The next chapters are dedicated to the buildings dating from 1970s and 1980s, and to some examples of the years after 2000. Finally an outlook into the future is given.

  3. Une Progression dans la Strategie Pedagogique pour assurer la Construction de Langage Oral L'ecole Maternelle [A Progression in Teaching Strategies to Ensure Oral Language Building in Nursery School].

    ERIC Educational Resources Information Center

    Durand, C.

    1997-01-01

    Summarizes progressions between 2 and 6 years of age in children's power of concentration, ability to express ideas, build logical relationships, structure spoken words, and play with the semantic, phonetic, syntactical, and morphological aspects of oral language. Notes that the progression depends on the educator's interaction with the child.…

  4. Relationship of COP System Interest Inventory Scales to Vocational Preference Inventory (VPI) Scales in a College Sample: Construct Validity of Scales Based on Progressed Occupational Interest.

    ERIC Educational Resources Information Center

    Omizo, Michael M.; And Others

    1983-01-01

    Construct validity data found some support for the California Occupational Preference System constructs when its results were evaluated on a sample of 213 female undergraduates relative to the Vocational Preference Inventory results. (PN)

  5. Co-constructing cultural landscapes for disciplinary learning in and out of school: the next generation science standards and learning progressions in action

    NASA Astrophysics Data System (ADS)

    Córdova, Ralph A.; Balcerzak, Phyllis

    2016-12-01

    The authors of this study are teacher-researchers, the first is a university researcher and former third and fourth grade teacher, while the second author is a university-based science educator. They report findings from a community-based study that Ralph, the first author, and his students conducted across two academic years (2001-2003) in order to illustrate the ways in which the next generation science standards and learning progressions can be appropriated as social-constructed practices inside and outside of school. The authors argue that what constitutes science learning in school is not a `state of grace' dictated by standards. Rather, becoming a scientist within a community of learners is a cultural phenomenon that teachers and students co-construct and as such teachers can approach the next generation science standards and learning progressions as opportunities to create intentional, disciplinary practice-based learning communities inside and outside of school.

  6. The Nature of Science Instrument-Elementary (NOSI-E): the end of the road?

    PubMed

    Peoples, Shelagh M; O'Dwyer, Laura M

    2014-01-01

    This research continues prior work published in this journal (Peoples, O'Dwyer, Shields and Wang, 2013). The first paper described the scale development, psychometric analyses and part-validation of a theoretically-grounded Rasch-based instrument, the Nature of Science Instrument-Elementary (NOSI-E). The NOSI-E was designed to measure elementary students' understanding of the Nature of Science (NOS). In the first paper, evidence was provided for three of the six validity aspects (content, substantive and generalizability) needed to support the construct validity of the NOSI-E. The research described in this paper examines two additional validity aspects (structural and external). The purpose of this study was to determine which of three competing internal models provides reliable, interpretable, and responsive measures of students' understanding of NOS. One postulate is that the NOS construct is unidimensional;. alternatively, the NOS construct is composed of five independent unidimensional constructs (the consecutive approach). Lastly, the NOS construct is multidimensional and composed of five inter-related but separate dimensions. The vast body of evidence supported the claim that the NOS construct is multidimensional. Measures from the multidimensional model were positively related to student science achievement and students' perceptions of their classroom environment; this provided supporting evidence for the external validity aspect of the NOS construct. As US science education moves toward students learning science through engaging in authentic scientific practices and building learning progressions (NRC, 2012), it will be important to assess whether this new approach to teaching science is effective, and the NOSI-E may be used as a measure of the impact of this reform.

  7. Physico-chemical study of some areas of fundamental significance to biophysics. Annual report, 1975--1976. [Chemistry Dept. , Louisiana State University, Baton Rouge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGlynn, S.P.

    1976-05-15

    Lists of titles published, symposia attended, laboratory guests, departing personnel, and equipment purchased are presented in the first part of this report. It is to be emphasized that completed work already published is mentioned only by title. Reports are provided for research recently completed or in progress in the following areas: Rydberg spectroscopy, intermediate-coupling model for linear molecules, atomic correlation lines, electronic structure of dicarbonyl compounds, absorption and emission characteristics of highly polar aromatics, valence-bond description of metal--anion interaction, and matrix elements of mono-excited Slater determinants constructed from axial spin-orbitals. (RWR)

  8. Intelligent robots for planetary exploration and construction

    NASA Technical Reports Server (NTRS)

    Albus, James S.

    1992-01-01

    Robots capable of practical applications in planetary exploration and construction will require realtime sensory-interactive goal-directed control systems. A reference model architecture based on the NIST Real-time Control System (RCS) for real-time intelligent control systems is suggested. RCS partitions the control problem into four basic elements: behavior generation (or task decomposition), world modeling, sensory processing, and value judgment. It clusters these elements into computational nodes that have responsibility for specific subsystems, and arranges these nodes in hierarchical layers such that each layer has characteristic functionality and timing. Planetary exploration robots should have mobility systems that can safely maneuver over rough surfaces at high speeds. Walking machines and wheeled vehicles with dynamic suspensions are candidates. The technology of sensing and sensory processing has progressed to the point where real-time autonomous path planning and obstacle avoidance behavior is feasible. Map-based navigation systems will support long-range mobility goals and plans. Planetary construction robots must have high strength-to-weight ratios for lifting and positioning tools and materials in six degrees-of-freedom over large working volumes. A new generation of cable-suspended Stewart platform devices and inflatable structures are suggested for lifting and positioning materials and structures, as well as for excavation, grading, and manipulating a variety of tools and construction machinery.

  9. Bibliographical Work in New Zealand, 1980-1982. Work in Progress and Work Published.

    ERIC Educational Resources Information Center

    Millett, A. P. U., Comp.; Cole, F. T. H., Comp.

    Formerly published as an irregular feature of New Zealand Libraries, these three annual bibliographies (1980, 1981, 1982) list bibliographical work in progress, as well as enumerative and subject bibliographies published in New Zealand from July 1977 to June 1982. It is noted that bibliographical work in progress is compiled from an annual…

  10. Night-time road construction operations synthesis of practice.

    DOT National Transportation Integrated Search

    2008-05-01

    report synthesizes existing literature on nighttime construction operations, identifies gaps in the current state of knowledge, and summarizes research in progress studies that are planned or underway. The literature review and synthesis found the fo...

  11. Confidence in Altman-Bland plots: a critical review of the method of differences.

    PubMed

    Ludbrook, John

    2010-02-01

    1. Altman and Bland argue that the virtue of plotting differences against averages in method-comparison studies is that 95% confidence limits for the differences can be constructed. These allow authors and readers to judge whether one method of measurement could be substituted for another. 2. The technique is often misused. So I have set out, by statistical argument and worked examples, to advise pharmacologists and physiologists how best to construct these limits. 3. First, construct a scattergram of differences on averages, then calculate the line of best fit for the linear regression of differences on averages. If the slope of the regression is shown to differ from zero, there is proportional bias. 4. If there is no proportional bias and if the scatter of differences is uniform (homoscedasticity), construct 'classical' 95% confidence limits. 5. If there is proportional bias yet homoscedasticity, construct hyperbolic 95% confidence limits (prediction interval) around the line of best fit. 6. If there is proportional bias and the scatter of values for differences increases progressively as the average values increase (heteroscedasticity), log-transform the raw values from the two methods and replot differences against averages. If this eliminates proportional bias and heteroscedasticity, construct 'classical' 95% confidence limits. Otherwise, construct horizontal V-shaped 95% confidence limits around the line of best fit of differences on averages or around the weighted least products line of best fit to the original data. 7. In designing a method-comparison study, consult a qualified biostatistician, obey the rules of randomization and make replicate observations.

  12. Neutral Buoyancy Simulator: MSFC-Langley joint test of large space structures component assembly:

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Another facet of the space station would be electrical cornectors which would be used for powering tools the astronauts would need for construction, maintenance and repairs. Shown is an astronaut training during an underwater electrical connector test in the NBS.

  13. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  14. Computational approach for deriving cancer progression roadmaps from static sample data

    PubMed Central

    Yao, Jin; Yang, Le; Chen, Runpu; Nowak, Norma J.

    2017-01-01

    Abstract As with any biological process, cancer development is inherently dynamic. While major efforts continue to catalog the genomic events associated with human cancer, it remains difficult to interpret and extrapolate the accumulating data to provide insights into the dynamic aspects of the disease. Here, we present a computational strategy that enables the construction of a cancer progression model using static tumor sample data. The developed approach overcame many technical limitations of existing methods. Application of the approach to breast cancer data revealed a linear, branching model with two distinct trajectories for malignant progression. The validity of the constructed model was demonstrated in 27 independent breast cancer data sets, and through visualization of the data in the context of disease progression we were able to identify a number of potentially key molecular events in the advance of breast cancer to malignancy. PMID:28108658

  15. Making acuity-adaptable units work: lessons from the field.

    PubMed

    Zimring, Craig; Seo, Hyun-Bo

    2012-01-01

    Because there have been no clear directions on how to implement acuity-adaptable units (AAUs), this paper describes actual tactics and strategies that have worked in multiple institutions. AAUs have been used in hospitals for the past decade, but reports in the literature have indicated both successes and difficulties in meeting operational goals and objectives. Despite various views regarding acuity adaptability, there is little in the literature that suggests why it works in some hospitals and not in others. As part of a larger construction project, this project team interviewed the leaders of six hospitals to determine what was associated with the successful implementation of AAUs. This paper reports on themes that emerged from these interviews, namely: choose the right specialty for medical centers; adopt the AAU model for the entire facility in community hospitals; bring in and train the right people; change culture through communication; and use acuity-adaptable unit clusters. Main themes, predictable patient progress, and culture change are further discussed and key recommendations are described.

  16. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry

    PubMed Central

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-01-01

    The construction industry is a demanding work environment where employees’ work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee’s work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee’s work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction. PMID:27801857

  17. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry.

    PubMed

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-10-28

    The construction industry is a demanding work environment where employees' work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee's work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee's work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction.

  18. Development and Validation of the Learning Progression-Based Assessment of Modern Genetics in a High School Context

    ERIC Educational Resources Information Center

    Todd, Amber; Romine, William L.; Cook Whitt, Katahdin

    2017-01-01

    We describe the development, validation, and use of the "Learning Progression-Based Assessment of Modern Genetics" (LPA-MG) in a high school biology context. Items were constructed based on a current learning progression framework for genetics (Shea & Duncan, 2013; Todd & Kenyon, 2015). The 34-item instrument, which was tied to…

  19. Construction Progress and Science Planning for the New Research Vessel R/V Sikuliaq

    NASA Astrophysics Data System (ADS)

    Whitledge, T. E.

    2011-12-01

    The research vessel R/V Sikuliaq (pronounced [see-KOO-lee-auk]) is currently being constructed on behalf of the NSF to support future scientific studies in high latitude waters. The 261 foot global class vessel will be capable of breaking 2.5 foot thick ice at 2 knots with an endurance of 45 days at sea and cruising at 11 knots. The R/V Sikuliaq will have a beam of 52 feet and a draft of 18.9 feet that will carry 26 scientists and a crew of 20. Berthing accommodations are a combination of single/double rooms with one stateroom and the common areas of the vessel are designed for ADA access and accommodations. The total laboratory space (main, analytical, electronics, wet, upper, and Baltic room will be 2100 square feet. The 4360 square foot working deck that is approximately 70 feet in length will accommodate 2-4 vans and multiple science operations. The vessel design strives to have the lowest possible environmental impact, including a low underwater-radiated noise signature. The science systems are prescribed to be state-of-the-art for bottom mapping, over-the-side "hands free" gear handling, broad band communications and scientific walk-in freezer and environmental chamber. More details and photos of the construction progress are available on the website at www.sfos.uaf.edu/arrv. The tentative shipyard schedule has a launch date of June 2012 and delivery to the University of Alaska Fairbanks in June 2013. Scientific operations following trials and testing is planned to start in January 2014. A Sikuliaq science planning workshop has been arranged for 18-19 February 2012 in Salt Lake City, UT just prior to the 2012 Ocean Sciences meeting. Interested participants should contact Terry Whitledge (terry@ims.uaf.edu).

  20. Cell module and fuel conditioner development

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1981-01-01

    The design features and plans for fabrication of Stacks 564 and 800 are described. The results of the OS/IES loop testing of Stack 562, endurance testing of Stack 560 and the post test analysis of Stack 561 are reported. Progress on construction and modification of the fuel cell test facilities and the 10 kW reformer test station is described. Efforts to develop the technical data base for the fuel conditioning system included vendor contacts, packed bed heat transfer tests, development of the BOLTAR computer program, and work on the detailed design of the 10 kW reformer are described.

  1. The Magneto-optical Filter, Working Principles and Recent Progress

    NASA Technical Reports Server (NTRS)

    Cacciani, A.; Rhodes, E. J., Jr.

    1984-01-01

    The Magneto-Optical Filter is described which allows simultaneous magnetic and velocity measurements (in both imaging and non-imaging modes) without the need for a spectrograph. In this way the stability and alignment problems of the spectrograph are completely overcome. Its major advantages are: wavelength absolute reference and stability, high signal to noise ratio and independence of the transmission profile from the incidence angle of the solar beam. It is an imaging instrument allowing high wave number analysis in the solar oscillation spectrum and a continuous monitoring of the image position through the chromospheric facular structures. The apparatus in use at Mt. Wilson is assembled in a modular form. The most important part of it is a glass cell containing the sodium vapor. The filter is easy to use but the cell is not easy to construct in an optimal way. The technology is in progress both to use Na and K together and to prevent the windows from becoming coated during a long-term operation.

  2. 40 CFR 60.2590 - When must I submit the notifications of achievement of increments of progress?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Model Rule-Increments of Progress § 60.2590 When must... increments of progress must be postmarked no later than 10 business days after the compliance date for the...

  3. Advanced Design Features of APR1400 and Realization in Shin Kori Construction Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OH, S.J.; Park, K.C.; Kim, H.G.

    2006-07-01

    APR1400 adopted several advanced design features. To ensure their proper operation as a part of ShinKori 3,4 project, both experimental and analytical work are continuing. In this paper, work on the advanced design features related to enhanced safety is examined. APR1400 safety injection system consists of four independent trains which include four safety injection pump and tanks. A passive flow regulating device called fluidic device is installed in the safety injection tanks. Separate effect tests including a full scale fluidic device tests have been conducted. Integral system tests are in progress. Combination of these work with the analytical work usingmore » RELAP5/Mod3 would ensure the proper operation of the new safety injection systems. To mitigate severe accidents, hydrogen mitigation system using PARs and igniters is adopted. Also, active injection system and the streamlined insulation design are adopted to enhance the in-vessel retention capability with the external cooling of RPV strategy. Analytic work with supporting experiments is performed. We are certain that these preparatory work would help the successful adaptation of ADF in ShinKori project. (authors)« less

  4. Growing a Constructive Culture at ITD

    DOT National Transportation Integrated Search

    2016-06-01

    The Center for Health and Safety Culture evaluated the progress of the Idaho Transportation Departments effort to transform its culture. In 2012, a representative sample of employees identified a constructive culture as the ideal culture that woul...

  5. Interpolation of longitudinal shape and image data via optimal mass transport

    NASA Astrophysics Data System (ADS)

    Gao, Yi; Zhu, Liang-Jia; Bouix, Sylvain; Tannenbaum, Allen

    2014-03-01

    Longitudinal analysis of medical imaging data has become central to the study of many disorders. Unfortunately, various constraints (study design, patient availability, technological limitations) restrict the acquisition of data to only a few time points, limiting the study of continuous disease/treatment progression. Having the ability to produce a sensible time interpolation of the data can lead to improved analysis, such as intuitive visualizations of anatomical changes, or the creation of more samples to improve statistical analysis. In this work, we model interpolation of medical image data, in particular shape data, using the theory of optimal mass transport (OMT), which can construct a continuous transition from two time points while preserving "mass" (e.g., image intensity, shape volume) during the transition. The theory even allows a short extrapolation in time and may help predict short-term treatment impact or disease progression on anatomical structure. We apply the proposed method to the hippocampus-amygdala complex in schizophrenia, the heart in atrial fibrillation, and full head MR images in traumatic brain injury.

  6. AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION

    NASA Technical Reports Server (NTRS)

    1974-01-01

    AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION KSC-374C-10236.33 108-KSC-374C-10236.33, P-15911, ARCHIVE-04477 Shuttle runway facility construction progress - oblique vertical, altitude 3,000 ft. time 1030 - direction south - south half from center.

  7. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  8. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.

  9. Pad 39B Flame Trench Brick Work

    NASA Image and Video Library

    2016-10-26

    Progress continues on the new flame trench at Launch Pad 39B at NASA's Kennedy Space Center in Florida. Construction workers with J.P. Donovan of Rockledge, Florida, prepare new heat-resistant bricks for installation on the north side of the flame trench. The Pad B flame trench is being refurbished to support the launch of NASA’s Space Launch System rocket. The Ground Systems Development and Operations (GSDO) Program at Kennedy is helping transform the space center into a multi-user spaceport and prepare for Exploration Mission 1, deep space missions, and NASA's Journey to Mars. For more information about GSDO, visit: http://www.nasa.gov/groundsystems.

  10. Pad 39B Flame Trench Brick Work

    NASA Image and Video Library

    2016-10-26

    Progress continues on the new flame trench at Launch Pad 39B at NASA's Kennedy Space Center in Florida. Construction workers with J.P. Donovan of Rockledge, Florida, attach new heat-resistant bricks on the north side of the flame trench. The Pad B flame trench is being refurbished to support the launch of NASA’s Space Launch System rocket. The Ground Systems Development and Operations (GSDO) Program at Kennedy is helping transform the space center into a multi-user spaceport and prepare for Exploration Mission 1, deep space missions, and NASA's Journey to Mars. For more information about GSDO, visit: http://www.nasa.gov/groundsystems.

  11. 48 CFR 836.575 - Schedule of work progress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Schedule of work progress. 836.575 Section 836.575 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL... work progress. The contracting officer shall insert the clause at 852.236-84, Schedule of work progress...

  12. Final Project Report for DOE Grant NO.: DE-SC0010534 Period: Sept 2013-March 31, 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunaydin, Murat

    2016-08-01

    Higher spin theories has been an active area of research in recent years. One of the main research activities of the PI Murat Gunaydin over the period of this grant has been the application of quasiconformal methods to construct and study higher spin (HS) algebras and superalgebras in various dimensions. Over the past decade work on amplitudes in gauge theories, supergravity and string theories has been a very active area of research. Enormous progress has been made in the understanding of the structure of amplitudes in these theories. The novel methods and results obtained have made it possible to domore » calculations in gauge theories and supergravity theories that go well beyond the calculations one can do using the old-fashioned Feynman diagram techniques. Work on amplitudes in matter-coupled supergravity theories has been the second main focus of the PI during the funding period. The previous work of the PI on supergravity theories has played a fundamentally important role in the current work on amplitudes.« less

  13. Neutral Buoyancy Simulator: MSFC-Langley joint test of large space structures component assembly:

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, VA and MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  14. Around Marshall

    NASA Image and Video Library

    1979-03-22

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, VA and MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  15. Around Marshall

    NASA Image and Video Library

    1977-07-13

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, VA and MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  16. Around Marshall

    NASA Image and Video Library

    1979-04-16

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, Virginia and the MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  17. Neutral Buoyancy Test - Large Space Structure

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, Virginia and the MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  18. Neutral Buoyancy Test - NB-18 - Large Space Structure Assembly

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. Construction methods had to be efficient due to the limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. With the help of the NBS, building a space station became more of a reality. In a joint venture between NASA/Langley Research Center in Hampton, Virginia and the MSFC, the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's NBS. The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction. Pictured is a demonstration of ACCESS.

  19. Metrological traceability in education: A practical online system for measuring and managing middle school mathematics instruction

    NASA Astrophysics Data System (ADS)

    Torres Irribarra, D.; Freund, R.; Fisher, W.; Wilson, M.

    2015-02-01

    Computer-based, online assessments modelled, designed, and evaluated for adaptively administered invariant measurement are uniquely suited to defining and maintaining traceability to standardized units in education. An assessment of this kind is embedded in the Assessing Data Modeling and Statistical Reasoning (ADM) middle school mathematics curriculum. Diagnostic information about middle school students' learning of statistics and modeling is provided via computer-based formative assessments for seven constructs that comprise a learning progression for statistics and modeling from late elementary through the middle school grades. The seven constructs are: Data Display, Meta-Representational Competence, Conceptions of Statistics, Chance, Modeling Variability, Theory of Measurement, and Informal Inference. The end product is a web-delivered system built with Ruby on Rails for use by curriculum development teams working with classroom teachers in designing, developing, and delivering formative assessments. The online accessible system allows teachers to accurately diagnose students' unique comprehension and learning needs in a common language of real-time assessment, logging, analysis, feedback, and reporting.

  20. Pathways to Colonization

    NASA Technical Reports Server (NTRS)

    Smitherman, David V., Jr.

    2003-01-01

    The steps required for space colonization are many to grow from our current 3-person International Space Station, now under construction, to an infrastructure that can support hundreds and eventually thousands of people in space. This paper will summarize the author's findings from numerous studies and workshops on related subjects and identify some of the critical next steps toward space colonization. Findings will be drawn from the author s previous work on space colony design, space infrastructure workshops, and various studies that addressed space policy. In conclusion, this paper will note that significant progress has been made on space facility construction through the International Space Station program, and that significant efforts are needed in the development of new reusable Earth to Orbit transportation systems. The next key steps will include reusable in space transportation systems supported by in space propellant depots, the continued development of inflatable habitat and space elevator technologies, and the resolution of policy issues that will establish a future vision for space development.

  1. Understanding and representing natural language meaning

    NASA Astrophysics Data System (ADS)

    Waltz, D. L.; Maran, L. R.; Dorfman, M. H.; Dinitz, R.; Farwell, D.

    1982-12-01

    During this contract period the authors have: (1) continued investigation of events and actions by means of representation schemes called 'event shape diagrams'; (2) written a parsing program which selects appropriate word and sentence meanings by a parallel process know as activation and inhibition; (3) begun investigation of the point of a story or event by modeling the motivations and emotional behaviors of story characters; (4) started work on combining and translating two machine-readable dictionaries into a lexicon and knowledge base which will form an integral part of our natural language understanding programs; (5) made substantial progress toward a general model for the representation of cognitive relations by comparing English scene and event descriptions with similar descriptions in other languages; (6) constructed a general model for the representation of tense and aspect of verbs; (7) made progress toward the design of an integrated robotics system which accepts English requests, and uses visual and tactile inputs in making decisions and learning new tasks.

  2. Measuring engagement in nurses: the psychometric properties of the Persian version of Utrecht Work Engagement Scale

    PubMed Central

    Torabinia, Mansour; Mahmoudi, Sara; Dolatshahi, Mojtaba; Abyaz, Mohamad Reza

    2017-01-01

    Background: Considering the overall tendency in psychology, researchers in the field of work and organizational psychology have become progressively interested in employees’ effective and optimistic experiments at work such as work engagement. This study was conducted to investigate 2 main purposes: assessing the psychometric properties of the Utrecht Work Engagement Scale, and finding any association between work engagement and burnout in nurses. Methods: The present methodological study was conducted in 2015 and included 248 females and 34 males with 6 months to 30 years of job experience. After the translation process, face and content validity were calculated by qualitative and quantitative methods. Moreover, content validation ratio, scale-level content validity index and item-level content validity index were measured for this scale. Construct validity was determined by factor analysis. Moreover, internal consistency and stability reliability were assessed. Factor analysis, test-retest, Cronbach’s alpha, and association analysis were used as statistical methods. Results: Face and content validity were acceptable. Exploratory factor analysis suggested a new 3- factor model. In this new model, some items from the construct model of the original version were dislocated with the same 17 items. The new model was confirmed by divergent Copenhagen Burnout Inventory as the Persian version of UWES. Internal consistency reliability for the total scale and the subscales was 0.76 to 0.89. Results from Pearson correlation test indicated a high degree of test-retest reliability (r = 0. 89). ICC was also 0.91. Engagement was negatively related to burnout and overtime per month, whereas it was positively related with age and job experiment. Conclusion: The Persian 3– factor model of Utrecht Work Engagement Scale is a valid and reliable instrument to measure work engagement in Iranian nurses as well as in other medical professionals. PMID:28955665

  3. Development of High Throughput Process for Constructing 454 Titanium and Illumina Libraries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshpande, Shweta; Hack, Christopher; Tang, Eric

    2010-05-28

    We have developed two processes with the Biomek FX robot to construct 454 titanium and Illumina libraries in order to meet the increasing library demands. All modifications in the library construction steps were made to enable the adaptation of the entire processes to work with the 96-well plate format. The key modifications include the shearing of DNA with Covaris E210 and the enzymatic reaction cleaning and fragment size selection with SPRI beads and magnetic plate holders. The construction of 96 Titanium libraries takes about 8 hours from sheared DNA to ssDNA recovery. The processing of 96 Illumina libraries takes lessmore » time than that of the Titanium library process. Although both processes still require manual transfer of plates from robot to other work stations such as thermocyclers, these robotic processes represent about 12- to 24-folds increase of library capacity comparing to the manual processes. To enable the sequencing of many libraries in parallel, we have also developed sets of molecular barcodes for both library types. The requirements for the 454 library barcodes include 10 bases, 40-60percent GC, no consecutive same base, and no less than 3 bases difference between barcodes. We have used 96 of the resulted 270 barcodes to construct libraries and pool to test the ability of accurately assigning reads to the right samples. When allowing 1 base error occurred in the 10 base barcodes, we could assign 99.6percent of the total reads and 100percent of them were uniquely assigned. As for the Illumina barcodes, the requirements include 4 bases, balanced GC, and at least 2 bases difference between barcodes. We have begun to assess the ability to assign reads after pooling different number of libraries. We will discuss the progress and the challenges of these scale-up processes.« less

  4. Methods and Procedures in PIRLS 2016

    ERIC Educational Resources Information Center

    Martin, Michael O., Ed.; Mullis, Ina V. S., Ed.; Hooper, Martin, Ed.

    2017-01-01

    "Methods and Procedures in PIRLS 2016" documents the development of the Progress in International Reading Literacy Study (PIRLS) assessments and questionnaires and describes the methods used in sampling, translation verification, data collection, database construction, and the construction of the achievement and context questionnaire…

  5. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  6. Continued progress in the prevention of nail gun injuries among apprentice carpenters: what will it take to see wider spread injury reductions?

    PubMed

    Lipscomb, Hester J; Nolan, James; Patterson, Dennis; Dement, John M

    2010-06-01

    Nail guns are a common source of acute, and potentially serious, injury in residential construction. Data on nail gun injuries, hours worked and hours of tool use were collected in 2008 from union apprentice carpenters (n=464) through classroom surveys; this completed four years of serial cross-sectional data collection from apprentices. A predictive model of injury risk was constructed using Poisson regression. Injury rates declined 55% from baseline measures in 2005 with early training and increased use of tools with sequential actuation. Injury rates declined among users of tools with both actuation systems, but the rates of injury were consistently twice as high among those using tools with contact trip triggers. DISCUSSION AND IMPACT: Nail gun injuries can be reduced markedly through early training and use of tools with sequential actuation. These successful efforts need to be diffused broadly, including to the non-union sector. (c) 2010 Elsevier Ltd. All rights reserved.

  7. Self-consistent construction of virialized wave dark matter halos

    NASA Astrophysics Data System (ADS)

    Lin, Shan-Chang; Schive, Hsi-Yu; Wong, Shing-Kwong; Chiueh, Tzihong

    2018-05-01

    Wave dark matter (ψ DM ), which satisfies the Schrödinger-Poisson equation, has recently attracted substantial attention as a possible dark matter candidate. Numerical simulations have, in the past, provided a powerful tool to explore this new territory of possibility. Despite their successes in revealing several key features of ψ DM , further progress in simulations is limited, in that cosmological simulations so far can only address formation of halos below ˜2 ×1011 M⊙ and substantially more massive halos have become computationally very challenging to obtain. For this reason, the present work adopts a different approach in assessing massive halos by constructing wave-halo solutions directly from the wave distribution function. This approach bears certain similarities with the analytical construction of the particle-halo (cold dark matter model). Instead of many collisionless particles, one deals with one single wave that has many noninteracting eigenstates. The key ingredient in the wave-halo construction is the distribution function of the wave power, and we use several halos produced by structure formation simulations as templates to determine the wave distribution function. Among different models, we find the fermionic King model presents the best fits and we use it for our wave-halo construction. We have devised an iteration method for constructing the nonlinear halo and demonstrate its stability by three-dimensional simulations. A Milky Way-sized halo has also been constructed, and the inner halo is found to be flatter than the NFW profile. These wave-halos have small-scale interferences both in space and time producing time-dependent granules. While the spatial scale of granules varies little, the correlation time is found to increase with radius by 1 order of magnitude across the halo.

  8. Field Trial of an Aerosol-Based Enclosure Sealing Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrington, Curtis; Springer, David

    2015-09-01

    This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology.« less

  9. Research progress and harnessing method of soil and water loss in Pisha Sandstone region

    NASA Astrophysics Data System (ADS)

    Xiao, P. Q.; Yang, C. X.; Jing, C. R.

    2018-05-01

    Pisha Sandstone region is the most vulnerable and the most dramatic area of soil erosion, severe soil erosion on the ecological bases of China’s energy security constitutes a serious challenge. Research progress of soil erosion in pisha Sandstone region was reviewed based on the need of soil and water ecological construction in Pisha Sandstone region and harnessing the yellow river including soil erosion mechanism, soil erosion dynamic monitoring and soil erosion simulation assessments. Meanwhile, the latest progress of soil and water conservation measures was analyzed, and the existing problems and future harnessing measures of soil and water loss were discussed. This study is to explore the comprehensive management method and provide scientific theory for constructing soil and water conservation project in Pisha Sandstone region.

  10. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    PubMed

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  11. Geometric Metamorphosis

    PubMed Central

    Niethammer, Marc; Hart, Gabriel L.; Pace, Danielle F.; Vespa, Paul M.; Irimia, Andrei; Van Horn, John D.; Aylward, Stephen R.

    2013-01-01

    Standard image registration methods do not account for changes in image appearance. Hence, metamorphosis approaches have been developed which jointly estimate a space deformation and a change in image appearance to construct a spatio-temporal trajectory smoothly transforming a source to a target image. For standard metamorphosis, geometric changes are not explicitly modeled. We propose a geometric metamorphosis formulation, which explains changes in image appearance by a global deformation, a deformation of a geometric model, and an image composition model. This work is motivated by the clinical challenge of predicting the long-term effects of traumatic brain injuries based on time-series images. This work is also applicable to the quantification of tumor progression (e.g., estimating its infiltrating and displacing components) and predicting chronic blood perfusion changes after stroke. We demonstrate the utility of the method using simulated data as well as scans from a clinical traumatic brain injury patient. PMID:21995083

  12. clearScience: Infrastructure for Communicating Data-Intensive Science.

    PubMed

    Bot, Brian M; Burdick, David; Kellen, Michael; Huang, Erich S

    2013-01-01

    Progress in biomedical research requires effective scientific communication to one's peers and to the public. Current research routinely encompasses large datasets and complex analytic processes, and the constraints of traditional journal formats limit useful transmission of these elements. We are constructing a framework through which authors can not only provide the narrative of what was done, but the primary and derivative data, the source code, the compute environment, and web-accessible virtual machines. This infrastructure allows authors to "hand their machine"- prepopulated with libraries, data, and code-to those interested in reviewing or building off of their work. This project, "clearScience," seeks to provide an integrated system that accommodates the ad hoc nature of discovery in the data-intensive sciences and seamless transitions from working to reporting. We demonstrate that rather than merely describing the science being reported, one can deliver the science itself.

  13. The constructive role of gender asymmetry in social interaction: further evidence.

    PubMed

    Psaltis, Charis

    2011-06-01

    Two hundred and sixty-four children aged 6.5-7.5 years (first graders) took part in a pre-test, interaction, and post-test experiment working on a spatial transformation task known as the 'village task'. Cognitive progress was assessed by pre- to post-test gains in both an immediate and delayed post-test in dyads and individual participants as a control. The results indicate clear links between particular pair types with both communication processes and with learning and cognitive developmental outcomes. The present study demonstrates that gender can act as a source of status asymmetry in peer interaction to influence communication, learning, and cognitive development in same- and mixed-sex dyads.

  14. 'I've put weight on cos I've bin inactive, cos I've 'ad me knee done': moral work in the obesity clinic.

    PubMed

    Webb, Helena

    2009-09-01

    As governments and healthcare systems grow increasingly concerned with the current obesity 'epidemic', sociological interest in the condition has also increased. Despite the emergence of work discussing obesity as a social phenomenon, the sociological dimensions of medical weight-loss treatments for obesity remain underexplored. This paper reports on a conversation analytic (CA) study and describes how moral issues surrounding weight and patienthood become visible when doctors and patients discuss obesity. Consultations in two UK National Health Service clinics were video-recorded and analysed to identify recurring patterns of interaction. This paper describes how patients answer opening questions: questions which begin the consultation, enabling patients to report their medical status. Analysis reveals that when producing their answers, patients typically imply either 'success' or 'lack of success' in their weight-loss progress. Whilst doing so, they construct their personal agency in different ways, crediting themselves for implied successes and resisting responsibility for lack of success. Through interaction the doctor and patient collaboratively construct obesity as a moral issue. The moral obligations invoked share similarities with certain perceived normative dynamics surrounding obesity and the responsibilities of patienthood. These findings have relevance to healthcare practice and add to sociological understanding of the modern obesity 'crisis'.

  15. Stress studies in EFG

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A program to study stress generation mechanisms in silicon sheet growth was started. The purpose of the research is to define post-growth temperature profiles for the sheet that can minimize its stress during growth at high speeds, e.g., greater than 3 cm/min. The initial tasks described concern work in progress toward the development of computing capabilities to (1) model stress-temperature relationships in steady-state ribbon growth, and (2) provide a means to calculate realistic temperature fields in ribbon, given growth system component temperatures as boundary conditions. If it is determined that low stress configurations can be achieved, the modeling is to be tested experimentally by constructing low-stress growth systems for EFG silicon ribbon.

  16. Modeling work zone crash frequency by quantifying measurement errors in work zone length.

    PubMed

    Yang, Hong; Ozbay, Kaan; Ozturk, Ozgur; Yildirimoglu, Mehmet

    2013-06-01

    Work zones are temporary traffic control zones that can potentially cause safety problems. Maintaining safety, while implementing necessary changes on roadways, is an important challenge traffic engineers and researchers have to confront. In this study, the risk factors in work zone safety evaluation were identified through the estimation of a crash frequency (CF) model. Measurement errors in explanatory variables of a CF model can lead to unreliable estimates of certain parameters. Among these, work zone length raises a major concern in this analysis because it may change as the construction schedule progresses generally without being properly documented. This paper proposes an improved modeling and estimation approach that involves the use of a measurement error (ME) model integrated with the traditional negative binomial (NB) model. The proposed approach was compared with the traditional NB approach. Both models were estimated using a large dataset that consists of 60 work zones in New Jersey. Results showed that the proposed improved approach outperformed the traditional approach in terms of goodness-of-fit statistics. Moreover it is shown that the use of the traditional NB approach in this context can lead to the overestimation of the effect of work zone length on the crash occurrence. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Modelling low velocity impact induced damage in composite laminates

    NASA Astrophysics Data System (ADS)

    Shi, Yu; Soutis, Constantinos

    2017-12-01

    The paper presents recent progress on modelling low velocity impact induced damage in fibre reinforced composite laminates. It is important to understand the mechanisms of barely visible impact damage (BVID) and how it affects structural performance. To reduce labour intensive testing, the development of finite element (FE) techniques for simulating impact damage becomes essential and recent effort by the composites research community is reviewed in this work. The FE predicted damage initiation and propagation can be validated by Non Destructive Techniques (NDT) that gives confidence to the developed numerical damage models. A reliable damage simulation can assist the design process to optimise laminate configurations, reduce weight and improve performance of components and structures used in aircraft construction.

  18. 40 CFR 62.14540 - When must I complete each increment of progress?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  19. 40 CFR 62.14540 - When must I complete each increment of progress?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  20. Fatal accidents in nighttime vs. daytime highway construction work zones.

    PubMed

    Arditi, David; Lee, Dong-Eun; Polat, Gul

    2007-01-01

    Awareness about worker safety in nighttime construction has been a major concern because it is believed that nighttime construction creates hazardous work conditions. However, only a few studies provide valuable comparative information about accident characteristics of nighttime and daytime highway construction activities. This study investigates fatal accidents that occurred in Illinois highway work zones in the period 1996-2001 in order to determine the safety differences between nighttime and daytime highway construction. The lighting and weather conditions were included into the study as control parameters to see their effects on the frequency of fatal accidents occurring in work zones. According to this study, there is evidence that nighttime construction is more hazardous than daytime construction. The inclusion of a weather parameter into the analysis has limited effect on this finding. The study justifies establishing an efficient work zone accident reporting system and taking all necessary measures to enhance safety in nighttime work zones.

  1. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  2. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  3. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  4. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  5. Compassion fatigue and burnout: what managers should know.

    PubMed

    Slatten, Lise Anne; David Carson, Kerry; Carson, Paula Phillips

    2011-01-01

    Most health care employees experience and are bolstered by compassion satisfaction as they deal with patients in need. However, the more empathetic a health care provider is, the more likely he or she will experience compassion fatigue. Compassion fatigue is a negative syndrome that occurs when dealing with the traumatic experiences of patients, and examples of symptoms include intrusive thoughts, sleeping problems, and depression. Compassion fatigue is different from burnout. Compassion fatigue is a rapidly occurring disorder for primary health care workers who work with suffering patients, whereas burnout, a larger construct, is a slowly progressing disorder for employees who typically are working in burdensome organizational environments. Managers can mitigate problems associated with compassion fatigue with a number of interventions including patient reassignments, formal mentoring programs, employee training, and a compassionate organizational culture. With burnout, health care managers will want to focus primarily on chronic organizational problems.

  6. Monte Carlo generators for hadron physics: updates on PHOKHARA and EKHARA generators

    NASA Astrophysics Data System (ADS)

    Czyż, Henryk; Kisza, Patrycja; Tracz, Szymon

    2017-04-01

    A short review of current upgrades of the PHOKHARA and EKHARA generators is presented together with a report on the work in progress. The upgrades are based on a newly constructed model of the χci - γ* - γ* and χci - J/ψ* - γ* form factors. Within this model predictions were made for the electronic widths of χc1 and χc2 and, based on the event generators results, cross sections e+e- → χc1 (→ J/ψ(→ μ+μ-)γ), e+e-→ e+e-χc1 and e+e-→ e+e-χc1 (→ J/ψ(→ μ+μ-)γ). Work supported in part by the Polish National Science Centre, grant number DEC-2012/07/B/ST2/03867 and German Research Foundation DFG under Contract No. Collaborative Research Center CRC-1044.

  7. 48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...

  8. Progressive Transitions from Algorithmic to Conceptual Understanding in Student Ability To Solve Chemistry Problems: A Lakatosian Interpretation.

    ERIC Educational Resources Information Center

    Niaz, Mansoor

    The main objective of this study is to construct models based on strategies students use to solve chemistry problems and to show that these models form sequences of progressive transitions similar to what Lakatos (1970) in the history of science refers to as progressive 'problemshifts' that increase the explanatory' heuristic power of the models.…

  9. Application of statistical distribution theory to launch-on-time for space construction logistic support

    NASA Technical Reports Server (NTRS)

    Morgenthaler, George W.

    1989-01-01

    The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

  10. Analysis and design of energy monitoring platform for smart city

    NASA Astrophysics Data System (ADS)

    Wang, Hong-xia

    2016-09-01

    The development and utilization of energy has greatly promoted the development and progress of human society. It is the basic material foundation for human survival. City running is bound to consume energy inevitably, but it also brings a lot of waste discharge. In order to speed up the process of smart city, improve the efficiency of energy saving and emission reduction work, maintain the green and livable environment, a comprehensive management platform of energy monitoring for government departments is constructed based on cloud computing technology and 3-tier architecture in this paper. It is assumed that the system will provide scientific guidance for the environment management and decision making in smart city.

  11. Photorealistic virtual anatomy based on Chinese Visible Human data.

    PubMed

    Heng, P A; Zhang, S X; Xie, Y M; Wong, T T; Chui, Y P; Cheng, C Y

    2006-04-01

    Virtual reality based learning of human anatomy is feasible when a database of 3D organ models is available for the learner to explore, visualize, and dissect in virtual space interactively. In this article, we present our latest work on photorealistic virtual anatomy applications based on the Chinese Visible Human (CVH) data. We have focused on the development of state-of-the-art virtual environments that feature interactive photo-realistic visualization and dissection of virtual anatomical models constructed from ultra-high resolution CVH datasets. We also outline our latest progress in applying these highly accurate virtual and functional organ models to generate realistic look and feel to advanced surgical simulators. (c) 2006 Wiley-Liss, Inc.

  12. Comparision of photogrammetric point clouds with BIM building elements for construction progress monitoring

    NASA Astrophysics Data System (ADS)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2014-08-01

    For construction progress monitoring a planned state of the construction at a certain time (as-planed) has to be compared to the actual state (as-built). The as-planed state is derived from a building information model (BIM), which contains the geometry of the building and the construction schedule. In this paper we introduce an approach for the generation of an as-built point cloud by photogrammetry. It is regarded that that images on a construction cannot be taken from everywhere it seems to be necessary. Because of this we use a combination of structure from motion process together with control points to create a scaled point cloud in a consistent coordinate system. Subsequently this point cloud is used for an as-built - as-planed comparison. For that voxels of an octree are marked as occupied, free or unknown by raycasting based on the triangulated points and the camera positions. This allows to identify not existing building parts. For the verification of the existence of building parts a second test based on the points in front and behind the as-planed model planes is performed. The proposed procedure is tested based on an inner city construction site under real conditions.

  13. 23 CFR 635.122 - Participation in progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.122 Participation in progress payments. (a..., based on a request for reimbursement submitted by State transportation departments. When the contract... value of the stockpiled material shall not exceed the appropriate portion of the value of the contract...

  14. Applying the Rule Space Model to Develop a Learning Progression for Thermochemistry

    ERIC Educational Resources Information Center

    Chen, Fu; Zhang, Shanshan; Guo, Yanfang; Xin, Tao

    2017-01-01

    We used the Rule Space Model, a cognitive diagnostic model, to measure the learning progression for thermochemistry for senior high school students. We extracted five attributes and proposed their hierarchical relationships to model the construct of thermochemistry at four levels using a hypothesized learning progression. For this study, we…

  15. 48 CFR 32.103 - Progress payments under construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor during any period for which a progress payment is to be made, a percentage of the progress payment may be retained. Retainage should not be used as a substitute for good contract management, and the contracting officer should not withhold funds without cause. Determinations to retain and the specific amount...

  16. Current status of the Taiwan Photon Source project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, Shih-Lin

    2014-03-05

    The progress of establishment of a high brightness and low emittance mid-energy storage ring is reported. The status of the 3 GeV Taiwan Photon Source (TPS) currently under construction will be presented. The progress on the civil construction, manufacturing of machine components, as well as the opportunity of using low emittace synchrotron source and phase I beamlines at TPS will be mentioned. The future planning of phase II beamlines and related research will be sketched. Future developments will be also briefly outlined.

  17. The endogenous fluorescence of fibroblast in collagen gels as indicator of stiffness of the extracellular matrix

    NASA Astrophysics Data System (ADS)

    Padilla-Martinez, J. P.; Ortega-Martinez, A.; Franco, W.

    2016-03-01

    The stiffness or rigidity of the extracellular matrix (ECM) regulates cell response. Established mechanical tests to measure stiffness, such as indentation and tensile tests, are invasive and destructive to the sample. Endogenous or native molecules to cells and ECM components, like tryptophan and cross-links of collagen, display fluorescence upon irradiation with ultraviolet light. Most likely, the concentration of these endogenous fluorophores changes as the stiffness of the ECM changes. In this work we investigate the endogenous fluorescence of collagen gels containing fibroblasts as a non-invasive non-destructive method to measure stiffness of the ECM. Human fibroblast cells were cultured in three-dimensional gels of type I collagen (50,000 cells/ml). This construct is a simple model of tissue contraction. During contraction, changes in the excitation-emission matrix (a fluorescence map in the 240-520/290-530 nm range) of constructs were measured with a spectrofluoremeter, and changes in stiffness were measured with a standard indentation test over 16 days. Results show that a progressive increase in fluorescence of the 290/340 nm excitation-emission pair correlates with a progressive increase in stiffness (r=0.9, α=0.5). The fluorescence of this excitation-emission pair is ascribed to tryptophan and variations in the fluorescence of this pair correlate with cellular proliferation. In this tissue model, the endogenous functional fluorescence of proliferating fibroblast cells is a biomechanical marker of stiffness of the ECM.

  18. 50 years of fusion research

    NASA Astrophysics Data System (ADS)

    Meade, Dale

    2010-01-01

    Fusion energy research began in the early 1950s as scientists worked to harness the awesome power of the atom for peaceful purposes. There was early optimism for a quick solution for fusion energy as there had been for fission. However, this was soon tempered by reality as the difficulty of producing and confining fusion fuel at temperatures of 100 million °C in the laboratory was appreciated. Fusion research has followed two main paths—inertial confinement fusion and magnetic confinement fusion. Over the past 50 years, there has been remarkable progress with both approaches, and now each has a solid technical foundation that has led to the construction of major facilities that are aimed at demonstrating fusion energy producing plasmas.

  19. An innovative platform for quick and flexible joining of assorted DNA fragments

    DOE PAGES

    De Paoli, Henrique Cestari; Tuskan, Gerald A.; Yang, Xiaohan

    2016-01-13

    Successful synthetic biology efforts rely on conceptual and experimental designs in combination with testing of multi-gene constructs. Despite recent progresses, several limitations still hinder the ability to flexibly assemble and collectively share different types of DNA segments. We describe an advanced system for joining DNA fragments from a universal library that automatically maintains open reading frames (ORFs) and does not require linkers, adaptors, sequence homology, amplification or mutation (domestication) of fragments in order to work properly. Moreover, we find that this system, which is enhanced by a unique buffer formulation, provides unforeseen capabilities for testing, and sharing, complex multi-gene circuitrymore » assembled from different DNA fragments.« less

  20. ML Construction Progress

    NASA Image and Video Library

    2014-12-17

    Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Scaffolding, or work platforms, have been installed around the base of the tower on the ML to continue upgrades and modifications to the structure. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. The ML is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  1. 40 CFR 62.14555 - What if I do not meet an increment of progress?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  2. 40 CFR 62.14555 - What if I do not meet an increment of progress?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62...

  3. C7 pars fracture subadjacent to C7 pedicle screw instrumentation at the caudal end of a posterior cervical instrumentation construct.

    PubMed

    Halim, Andrea; Grauer, Jonathan

    2014-07-01

    We report a case of a C7 pars fracture subadjacent to C7 pedicle screw instrumentation at the caudal end of posterior cervical instrumentation construct. To date, posterior cervical instrumentation has been "off label"; however, the US Food and Drug Administration is considering approving label indication of such instrumentation for this common surgical practice. Complications related to the techniques are reported to be relatively low. We know of no previous reports of pars fractures occurring subadjacent to such instrumentation. A 43-year-old man underwent posterior C5-C7 instrumented fusion. Postoperatively, the patient experienced cervical spine injury after a mechanical fall down stairs. Work-up detected bilateral C7 pars fractures subadjacent to the posterior instrumentation construct. After we treated the pars fracture with distal extension of the posterior fusion to the level of T2, the patient progressed to union and marked improvement of initial clinical symptoms that was maintained 2.5 years after posterior instrumentation. To our knowledge, a C7 pars fracture subadjacent to posterior cervical instrumentation construct has not been reported. We hypothesize that the pars may have been vulnerable to fracture because of excessive bone resection during foraminotomy or decortication. This complication was successfully treated by extending the fusion caudally.

  4. 29 CFR 1910.12 - Construction work.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 5 2014-07-01 2014-07-01 false Construction work. 1910.12 Section 1910.12 Labor... Construction work. (a) Standards. The standards prescribed in part 1926 of this chapter are adopted as... provisions thereof, to every employment and place of employment of every employee engaged in construction...

  5. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  6. Characteristics of worker accidents on NYSDOT construction projects.

    PubMed

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  7. Partial Return Yoke for MICE Step IV and Final Step

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witte, Holger; Plate, Stephen; Berg, J.Scott

    2015-06-01

    This paper reports on the progress of the design and construction of a retro-fitted return yoke for the international Muon Ionization Cooling Experiment (MICE). MICE is a proof-of-principle experiment aiming to demonstrate ionization cooling experimentally. In earlier studies we outlined how a partial return yoke can be used to mitigate stray magnetic field in the experimental hall; we report on the progress of the construction of the partial return yoke for MICE Step IV. We also discuss an extension of the Partial Return Yoke for the final step of MICE; we show simulation results of the expected performance.

  8. Partial return yoke for MICE step IV and final step

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witte, H.; Plate, S.; Berg, J. S.

    2015-05-03

    This paper reports on the progress of the design and construction of a retro-fitted return yoke for the international Muon Ionization Cooling Experiment (MICE). MICE is a proof-of-principle experiment aiming to demonstrate ionization cooling experimentally. In earlier studies we outlined how a partial return yoke can be used to mitigate stray magnetic field in the experimental hall; we report on the progress of the construction of the partial return yoke for MICE Step IV. We also discuss an extension of the Partial Return Yoke for the final step of MICE; we show simulation results of the expected performance.

  9. Development and Validation of a Taiwanese Communication Progression in Science Education

    ERIC Educational Resources Information Center

    Hsin, Ming-Chin; Chien, Sung-pei; Hsu, Yin-Shao; Lin, Chen-Yung; Yore, Larry D.

    2016-01-01

    Common core standards, interdisciplinary education, and discipline-specific literacy are common international education reforms. The constructive-interpretative language arts pairs (speaking-listening, writing-reading, representing-viewing) and the communication, construction, and persuasion functions of language are central in these movements.…

  10. 29 CFR 1910.12 - Construction work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... already be included in paragraph (b) of this section, “construction work” includes the erection of new... 29 Labor 5 2010-07-01 2010-07-01 false Construction work. 1910.12 Section 1910.12 Labor... Construction work. (a) Standards. The standards prescribed in part 1926 of this chapter are adopted as...

  11. Progress on the International Space Station - We're Part Way up the Mountain

    NASA Technical Reports Server (NTRS)

    Fortenberry, Lindy; Bartoe, John-David F.; Holloway, Thomas

    2001-01-01

    The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

  12. A novel bioreactor for the generation of highly aligned 3D skeletal muscle-like constructs through orientation of fibrin via application of static strain.

    PubMed

    Heher, Philipp; Maleiner, Babette; Prüller, Johanna; Teuschl, Andreas Herbert; Kollmitzer, Josef; Monforte, Xavier; Wolbank, Susanne; Redl, Heinz; Rünzler, Dominik; Fuchs, Christiane

    2015-09-01

    The generation of functional biomimetic skeletal muscle constructs is still one of the fundamental challenges in skeletal muscle tissue engineering. With the notion that structure strongly dictates functional capabilities, a myriad of cell types, scaffold materials and stimulation strategies have been combined. To further optimize muscle engineered constructs, we have developed a novel bioreactor system (MagneTissue) for rapid engineering of skeletal muscle-like constructs with the aim to resemble native muscle in terms of structure, gene expression profile and maturity. Myoblasts embedded in fibrin, a natural hydrogel that serves as extracellular matrix, are subjected to mechanical stimulation via magnetic force transmission. We identify static mechanical strain as a trigger for cellular alignment concomitant with the orientation of the scaffold into highly organized fibrin fibrils. This ultimately yields myotubes with a more mature phenotype in terms of sarcomeric patterning, diameter and length. On the molecular level, a faster progression of the myogenic gene expression program is evident as myogenic determination markers MyoD and Myogenin as well as the Ca(2+) dependent contractile structural marker TnnT1 are significantly upregulated when strain is applied. The major advantage of the MagneTissue bioreactor system is that the generated tension is not exclusively relying on the strain generated by the cells themselves in response to scaffold anchoring but its ability to subject the constructs to individually adjustable strain protocols. In future work, this will allow applying mechanical stimulation with different strain regimes in the maturation process of tissue engineered constructs and elucidating the role of mechanotransduction in myogenesis. Mechanical stimulation of tissue engineered skeletal muscle constructs is a promising approach to increase tissue functionality. We have developed a novel bioreactor-based 3D culture system, giving the user the possibility to apply different strain regimes like static, cyclic or ramp strain to myogenic precursor cells embedded in a fibrin scaffold. Application of static mechanical strain leads to alignment of fibrin fibrils along the axis of strain and concomitantly to highly aligned myotube formation. Additionally, the pattern of myogenic gene expression follows the temporal progression observed in vivo with a more thorough induction of the myogenic program when static strain is applied. Ultimately, the strain protocol used in this study results in a higher degree of muscle maturity demonstrated by enhanced sarcomeric patterning and increased myotube diameter and length. The introduced bioreactor system enables new possibilities in muscle tissue engineering as longer cultivation periods and different strain applications will yield tissue engineered muscle-like constructs with improved characteristics in regard to functionality and biomimicry. Copyright © 2015 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.

  13. From the WPA to Workfare: It's Time for a Truly Progressive Government Work Program.

    ERIC Educational Resources Information Center

    Rose, Nancy E.

    1990-01-01

    Examines two government voluntary job creation programs: the Works Progress Administration in the 1930s and the Comprehensive Employment and Training Act in the 1970s, that have created conflicts with the logic of capitalist production for profit. Suggests principles and policies for a progressive government work program. (JOW)

  14. 7 CFR 1753.77 - Methods of minor construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction... Contract Form 773, “Miscellaneous Construction Work and Maintenance Services”, by RUS Contract Form 515, or by work order construction. The rules for using Form 515 for minor construction are contained in...

  15. From Understanding the Development Landscape of the Canonical Fate-Switch Pair to Constructing a Dynamic Landscape for Two-Step Neural Differentiation

    PubMed Central

    2012-01-01

    Abstract Recent progress in stem cell biology, notably cell fate conversion, calls for novel theoretical understanding for cell differentiation. The existing qualitative concept of Waddington’s “epigenetic landscape” has attracted particular attention because it captures subsequent fate decision points, thus manifesting the hierarchical (“tree-like”) nature of cell fate diversification. Here, we generalized a recent work and explored such a developmental landscape for a two-gene fate decision circuit by integrating the underlying probability landscapes with different parameters (corresponding to distinct developmental stages). The change of entropy production rate along the parameter changes indicates which parameter changes can represent a normal developmental process while other parameters’ change can not. The transdifferentiation paths over the landscape under certain conditions reveal the possibility of a direct and reversible phenotypic conversion. As the intensity of noise increases, we found that the landscape becomes flatter and the dominant paths more straight, implying the importance of biological noise processing mechanism in development and reprogramming. We further extended the landscape of the one-step fate decision to that for two-step decisions in central nervous system (CNS) differentiation. A minimal network and dynamic model for CNS differentiation was firstly constructed where two three-gene motifs are coupled. We then implemented the SDEs (Stochastic Differentiation Equations) simulation for the validity of the network and model. By integrating the two landscapes for the two switch gene pairs, we constructed the two-step development landscape for CNS differentiation. Our work provides new insights into cellular differentiation and important clues for better reprogramming strategies. PMID:23300518

  16. Servant Leadership and Constructive Development Theory: How Servant Leaders Make Meaning of Service

    ERIC Educational Resources Information Center

    Phipps, Kelly A.

    2010-01-01

    A connection between servant leadership and constructive developmental theory is proposed. A theoretical framework is offered that examines the subject and object relationship for servant leaders at progressive stages of meaning making, showing how the way leaders make meaning of service evolves with their constructive development. The framework…

  17. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... example, if two ships are contracted for at the same time, each ship is considered separately under this... construction period of that unit. For example, if a manufacturing plant has a normal construction period of two... normal construction period of less than two years, the plant and the equipment do not constitute an...

  18. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... example, if two ships are contracted for at the same time, each ship is considered separately under this... construction period of that unit. For example, if a manufacturing plant has a normal construction period of two... normal construction period of less than two years, the plant and the equipment do not constitute an...

  19. 19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  20. 40 CFR 60.1605 - What if I do not meet an increment of progress?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule... increment of progress, you must submit a notification to the Administrator postmarked within 10 business...

  1. Compressed-air work is entering the field of high pressures.

    PubMed

    Le Péchon, J Cl; Gourdon, G

    2010-01-01

    Since 1850, compressed-air work has been used to prevent shafts or tunnels under construction from flooding. Until the 1980s, workers were digging in compressed-air environments. Since the introduction of tunnel boring machines (TBMs), very little digging under pressure is needed. However, the wearing out of cutter-head tools requires inspection and repair. Compressed-air workers enter the pressurized working chamber only occasionally to perform such repairs. Pressures between 3.5 and 4.5 bar, that stand outside a reasonable range for air breathing, were reached by 2002. Offshore deep diving technology had to be adapted to TBM work. Several sites have used mixed gases: in Japan for deep shaft sinking (4.8 bar), in The Netherlands at Western Scheldt Tunnels (6.9 bar), in Russia for St. Petersburg Metro (5.8 bar) and in the United States at Seattle (5.8 bar). Several tunnel projects are in progress that may involve higher pressures: Hallandsås (Sweden) interventions in heliox saturation up to 13 bar, and Lake Mead (U.S.) interventions to about 12 bar (2010). Research on TBMs and grouting technologies tries to reduce the requirements for hyperbaric works. Adapted international rules, expertise and services for saturation work, shuttles and trained personnel matching industrial requirements are the challenges.

  2. Childhood and Happiness in German Romanticism, Progressive Education and in the West German Anti-Authoritarian "Kinderladen" Movement in the Context of 1968

    ERIC Educational Resources Information Center

    Baader, Meike S.

    2012-01-01

    The subject of this paper is the construction of childhood as a time of happiness in different historical periods. It first analyses the construction of childhood as a time of happiness in the German romantic period in the eighteenth century. Secondly, the paper discusses the construction of happy mothers and children in "The Century of…

  3. 14 CFR 151.45 - Performance of construction work: General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: General... § 151.45 Performance of construction work: General requirements. (a) All construction work under a... work under a project until— (1) The sponsor has furnished three conformed copies of the contract to the...

  4. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 1 2011-04-01 2009-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  5. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  6. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 1 2014-04-01 2013-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  7. PROGRESSION OF DISEASES CAUSED BY THE OYSTER PARASITES, PERKINSUS MARINUS AND HAPLOSPORIDIUM NELSONI IN CRASSOSTREA VIRGINICA ON CONSTRUCTED INTERTIDAL REEFS

    EPA Science Inventory

    The progression of diseases caused by the oyster parasites, Perkinsus marinus and Haplosporidium nelsoni, were evaluated by periodic sampling (May 1994 - December 1995) of oysters, Crassostrea virginica, on an artificial reef located in the Piankatank River, Virginia. The infecti...

  8. Psychosocial factors, musculoskeletal disorders and work-related fatigue amongst nurses in Brunei: structural equation model approach.

    PubMed

    Abdul Rahman, Hanif; Abdul-Mumin, Khadizah; Naing, Lin

    2017-09-01

    Psychosocial factors, musculoskeletal disorders and work-related fatigue have adverse effects on individual nurses and place a substantial financial burden on health care. Evidence of an association has been reported in the literature, but no theoretical explanation has been published to date. To explore and develop a structural model to provide a theoretical explanation for this relationship. A cross-sectional study using data from 201 valid samples of emergency and critical care nurses across public hospitals in Brunei was performed via self-administered questionnaire. The structural equation model was assessed using partial least squares analysis. A valid and robust structural model was constructed. This revealed that 61.5% of the variance in chronic fatigue could be explained by psychosocial factors and musculoskeletal disorders pathways. Among the psychosocial factors, work-family conflict was identified as a key mediator for progression of musculoskeletal problems and subsequent fatigue through stress and burnout. This report provides a novel theoretical contribution to understanding the relationship between psychosocial factors, musculoskeletal disorders and work-related fatigue. These preliminary results may be useful for future studies on the development of work-related fatigue and musculoskeletal disorders, particularly the central role of work-family conflict. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Research Progress of Building Materials Used in Construction Land

    NASA Astrophysics Data System (ADS)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  10. RADON PREVENTION IN THE DESIGN AND CONSTRUCTION OF SCHOOLS AND OTHER LARGE BUILDINGS

    EPA Science Inventory

    The paper discusses radon prevention in the design and construction of schools and other large buildings. ased on studies in progress for the past 3 years, the U.S. EPA's Office of Research and Development (ORD) has started incorporating radon control measures into the design and...

  11. Electrical and mechanical stimulation of cardiac cells and tissue constructs.

    PubMed

    Stoppel, Whitney L; Kaplan, David L; Black, Lauren D

    2016-01-15

    The field of cardiac tissue engineering has made significant strides over the last few decades, highlighted by the development of human cell derived constructs that have shown increasing functional maturity over time, particularly using bioreactor systems to stimulate the constructs. However, the functionality of these tissues is still unable to match that of native cardiac tissue and many of the stem-cell derived cardiomyocytes display an immature, fetal like phenotype. In this review, we seek to elucidate the biological underpinnings of both mechanical and electrical signaling, as identified via studies related to cardiac development and those related to an evaluation of cardiac disease progression. Next, we review the different types of bioreactors developed to individually deliver electrical and mechanical stimulation to cardiomyocytes in vitro in both two and three-dimensional tissue platforms. Reactors and culture conditions that promote functional cardiomyogenesis in vitro are also highlighted. We then cover the more recent work in the development of bioreactors that combine electrical and mechanical stimulation in order to mimic the complex signaling environment present in vivo. We conclude by offering our impressions on the important next steps for physiologically relevant mechanical and electrical stimulation of cardiac cells and engineered tissue in vitro. Copyright © 2015 Elsevier B.V. All rights reserved.

  12. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  13. Design and application of electromechanical actuators for deep space missions

    NASA Technical Reports Server (NTRS)

    Haskew, Tim A.; Wander, John

    1994-01-01

    This progress report documents research and development efforts performed from August 16, 1993 through August 15, 1994 on NASA Grant NAG8-240, 'Design and Application of Electromechanical Actuators for Deep Space Missions.' Since the submission of our last progress report in February 1994, our efforts have been almost entirely focused on final construction of the test stand and experiment design. Hence, this report is dedicated solely to these topics. However, updates on our research personnel and our health monitoring and fault management efforts are provided in this summary. Following this executive summary are two report sections. The first is devoted to the motor drive being constructed for the test stand. The thrust of the next section is the mechanical and hydraulic design and construction based on the planned experimental requirements. Following both major sections are three appendices.

  14. Progression in Complexity: Contextualizing Sustainable Marine Resources Management in a 10th Grade Classroom

    NASA Astrophysics Data System (ADS)

    Bravo-Torija, Beatriz; Jiménez-Aleixandre, María-Pilar

    2012-01-01

    Sustainable management of marine resources raises great challenges. Working with this socio-scientific issue in the classroom requires students to apply complex models about energy flow and trophic pyramids in order to understand that food chains represent transfer of energy, to construct meanings for sustainable resources management through discourse, and to connect them to actions and decisions in a real-life context. In this paper we examine the process of elaboration of plans for resources management in a marine ecosystem by 10th grade students (15-16 year) in the context of solving an authentic task. A complete class ( N = 14) worked in a sequence about ecosystems. Working in small groups, the students made models of energy flow and trophic pyramids, and used them to solve the problem of feeding a small community for a long time. Data collection included videotaping and audiotaping of all of the sessions, and collecting the students' written productions. The research objective is to examine the process of designing a plan for sustainable resources management in terms of the discursive moves of the students across stages in contextualizing practices, or different degrees of complexity (Jiménez-Aleixandre & Reigosa International Journal of Science Education, 14(1): 51-61 2006), understood as transformations from theoretical statements to decisions about the plan. The analysis of students' discursive moves shows how the groups progressed through stages of connecting different models, between them and with the context, in order to solve the task. The challenges related to taking this sustainability issue to the classroom are discussed.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardiner, K.

    Tremendous progress has been made in the construction of physical and genetic maps of the human chromosomes. The next step in the solving of disease related problems, and in understanding the human genome as a whole, is the systematic isolation of transcribed sequences. Many investigators have already embarked upon comprehensive gene searches, and many more are considering the best strategies for undertaking such searches. Because these are likely to be costly and time consuming endeavors, it is important to determine the most efficient approaches. As a result, it is critical that investigators involved in the construction of transcriptional maps havemore » the opportunity to discuss their experiences and their successes with both old and new technologies. This document contains the proceedings of the Fourth Annual Workshop on the Identification of Transcribed Sequences, held in Montreal, Quebec, October 16-18, 1994. Included are the workshop notebook, containing the agenda, abstracts presented and list of attendees. Topics included: Progress in the application of the hybridization based approaches and exon trapping; Progress in transcriptional map construction of selected genomic regions; Computer assisted analysis of genomic and protein coding sequences and additional new approaches; and, Sequencing and mapping of random cDNAs.« less

  16. Dependence as a unifying construct in defining Alzheimer’s disease severity

    PubMed Central

    McLaughlin, Trent; Feldman, Howard; Fillit, Howard; Sano, Mary; Schmitt, Frederick; Aisen, Paul; Leibman, Christopher; Mucha, Lisa; Ryan, J. Michael; Sullivan, Sean D.; Spackman, D. Eldon; Neumann, Peter J.; Cohen, Joshua; Stern, Yaakov

    2012-01-01

    This article reviews measures of Alzheimer’s disease (AD) progression in relation to patient dependence and offers a unifying conceptual framework for dependence in AD. Clinicians typically characterize AD by symptomatic impairments in three domains: cognition, function, and behavior. From a patient’s perspective, changes in these domains, individually and in concert, ultimately lead to increased dependence and loss of autonomy. Examples of dependence in AD range from a need for reminders (early AD) to requiring safety supervision and assistance with basic functions (late AD). Published literature has focused on the clinical domains as somewhat separate constructs and has given limited attention to the concept of patient dependence as a descriptor of AD progression. This article presents the concept of dependence on others for care needs as a potential method for translating the effect of changes in cognition, function, and behavior into a more holistic, transparent description of AD progression. PMID:21044778

  17. Dependence as a unifying construct in defining Alzheimer's disease severity.

    PubMed

    McLaughlin, Trent; Feldman, Howard; Fillit, Howard; Sano, Mary; Schmitt, Frederick; Aisen, Paul; Leibman, Christopher; Mucha, Lisa; Ryan, J Michael; Sullivan, Sean D; Spackman, D Eldon; Neumann, Peter J; Cohen, Joshua; Stern, Yaakov

    2010-11-01

    This article reviews measures of Alzheimer's disease (AD) progression in relation to patient dependence and offers a unifying conceptual framework for dependence in AD. Clinicians typically characterize AD by symptomatic impairments in three domains: cognition, function, and behavior. From a patient's perspective, changes in these domains, individually and in concert, ultimately lead to increased dependence and loss of autonomy. Examples of dependence in AD range from a need for reminders (early AD) to requiring safety supervision and assistance with basic functions (late AD). Published literature has focused on the clinical domains as somewhat separate constructs and has given limited attention to the concept of patient dependence as a descriptor of AD progression. This article presents the concept of dependence on others for care needs as a potential method for translating the effect of changes in cognition, function, and behavior into a more holistic, transparent description of AD progression. Copyright © 2010. Published by Elsevier Inc.

  18. ITER activities and fusion technology

    NASA Astrophysics Data System (ADS)

    Seki, M.

    2007-10-01

    At the 21st IAEA Fusion Energy Conference, 68 and 67 papers were presented in the categories of ITER activities and fusion technology, respectively. ITER performance prediction, results of technology R&D and the construction preparation provide good confidence in ITER realization. The superconducting tokamak EAST achieved the first plasma just before the conference. The construction of other new experimental machines has also shown steady progress. Future reactor studies stress the importance of down sizing and a steady-state approach. Reactor technology in the field of blanket including the ITER TBM programme and materials for the demonstration power plant showed sound progress in both R&D and design activities.

  19. Evaluating the Impacts of Health, Social Network and Capital on Craft Efficiency and Productivity: A Case Study of Construction Workers in China

    PubMed Central

    Yi, Wen; Miao, Mengyi; Zhang, Lei

    2018-01-01

    The construction industry has been recognized, for many years, as among those having a high likelihood of accidents, injuries and occupational illnesses. Such risks of construction workers can lead to low productivity and social problems. As a result, construction workers’ well-being should be highly addressed to improve construction workers’ efficiency and productivity. Meanwhile, the social support from a social network and capital (SNC) of construction workers has been considered as an effective approach to promote construction workers’ physical and mental health (P&M health), as well as their work efficiency and productivity. Based on a comprehensive literature review, a conceptual model, which aims to improve construction workers’ efficiency and productivity from the perspective of health and SNC, was proposed. A questionnaire survey was conducted to investigate the construction workers’ health, SNC and work efficiency and productivity in Nanjing, China. A structural equation model (SEM) was employed to test the three hypothetical relationships among construction workers’ P&M health, SNC and work efficiency and productivity. The results indicated that the direct impacts from construction workers’ P&M health on work efficiency and productivity were more significant than that from the SNC. In addition, the construction workers’ social capital and the network can indirectly influence the work efficiency and productivity by affecting the construction workers’ P&M health. Therefore, strategies for enhancing construction workers’ efficiency and productivity were proposed. Furthermore, many useable suggestions can be drawn from the research findings from the perspective of a government. The identified indicators and relationships would contribute to the construction work efficiency and productivity assessment and health management from the perspective of the construction workers. PMID:29462861

  20. Evaluating the Impacts of Health, Social Network and Capital on Craft Efficiency and Productivity: A Case Study of Construction Workers in China.

    PubMed

    Yuan, Jingfeng; Yi, Wen; Miao, Mengyi; Zhang, Lei

    2018-02-15

    The construction industry has been recognized, for many years, as among those having a high likelihood of accidents, injuries and occupational illnesses. Such risks of construction workers can lead to low productivity and social problems. As a result, construction workers' well-being should be highly addressed to improve construction workers' efficiency and productivity. Meanwhile, the social support from a social network and capital (SNC) of construction workers has been considered as an effective approach to promote construction workers' physical and mental health (P&M health), as well as their work efficiency and productivity. Based on a comprehensive literature review, a conceptual model, which aims to improve construction workers' efficiency and productivity from the perspective of health and SNC, was proposed. A questionnaire survey was conducted to investigate the construction workers' health, SNC and work efficiency and productivity in Nanjing, China. A structural equation model (SEM) was employed to test the three hypothetical relationships among construction workers' P&M health, SNC and work efficiency and productivity. The results indicated that the direct impacts from construction workers' P&M health on work efficiency and productivity were more significant than that from the SNC. In addition, the construction workers' social capital and the network can indirectly influence the work efficiency and productivity by affecting the construction workers' P&M health. Therefore, strategies for enhancing construction workers' efficiency and productivity were proposed. Furthermore, many useable suggestions can be drawn from the research findings from the perspective of a government. The identified indicators and relationships would contribute to the construction work efficiency and productivity assessment and health management from the perspective of the construction workers.

  1. Integrated risk management for improving internal traffic control, work-zone safety, and mobility during major construction : tech transfer summary.

    DOT National Transportation Integrated Search

    2012-10-01

    Construction work zones are among the most dangerous places to work in any industry in the world. This is because many factors in construction, such as constant change in working environments and driver errors, contribute to a workplace with a higher...

  2. Mobilizing Foucault: history, subjectivity and autonomous learners in nurse education.

    PubMed

    Darbyshire, Chris; Fleming, Valerie E M

    2008-12-01

    In the past 20, years the impact of progressive educational theories have become influential in nurse education particularly in relation to partnership and empowerment between lecturers and students and the development of student autonomy. The introduction of these progressive theories was in response to the criticisms that nurse education was characterized by hierarchical and asymmetrical power relationships between lecturers and students that encouraged rote learning and stifled student autonomy. This article explores how the work of Michel Foucault can be mobilized to think about autonomy in three different yet overlapping ways: as a historical event; as a discursive practice; and as part of an overall strategy to produce a specific student subject position. The implications for educational practice are that, rather than a site where students are empowered, nurse education is both a factory and a laboratory where new subjectivities are continually being constructed. This suggests that empowering practices and disciplinary practices uneasily co-exist. Critical reflection needs to be directed not only at structural dimensions of power but also on ourselves as students and lecturers by asking a Foucauldian question: How are you interested in autonomy?

  3. The concept of value stream mapping to reduce of work-time waste as applied the smart construction management

    NASA Astrophysics Data System (ADS)

    Elizar, Suripin, Wibowo, Mochamad Agung

    2017-11-01

    Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.

  4. Work-related to musculoskeletal disorder amongst Malaysian construction trade workers: Bricklayers

    NASA Astrophysics Data System (ADS)

    Lop, Nor Suzila; Kamar, Izatul Farrita Mohd; Aziz, Mohd Nasiruddin Abdul; Abdullah, Lizawati; Akhir, Norizan Mt

    2017-10-01

    Construction sector is one of the highest risk industries contributing to the development of work-related musculoskeletal disorders. In general construction activities involve the composition of various construction trades, such as painting, plastering, concreting, paving and bricklaying. Different construction trades workers are exposed to risk factors depending their job and task. There are risk factors associated with the construction trade workers activities such as concrete work, brickwork, piling work excavation works and etc. Thus, the aim of this research is to document the critical activities that affect the musculoskeletal disorders amongst Malaysian construction trade workers, in particular to the bricklayers. The objective of this research is to identify the critical activities that affect to the musculoskeletal disorder among the bricklayers. The data for this research was collected via observation to the construction workers for the specific trades which are bricklayers in Perak. Finding of this research is by identifying the critical activities involved that affect the musculoskeletal disorder suffering among bricklayers.

  5. Extravehicular Crewman Work System (ECWS) study program. Volume 2: Construction

    NASA Technical Reports Server (NTRS)

    Wilde, R. C.

    1980-01-01

    The construction portion of the Extravehicular Crewman Work System Study defines the requirements and selects the concepts for the crewman work system required to support the construction of large structures in space.

  6. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  7. Work schedules and 11-year progression of carotid atherosclerosis in middle-aged Finnish men.

    PubMed

    Wang, Aolin; Arah, Onyebuchi A; Kauhanen, Jussi; Krause, Niklas

    2015-01-01

    This study investigated the relationship between different work schedules and progression of carotid atherosclerosis, an early indicator of cardiovascular disease (CVD). We studied 621 men, aged 42-60 years, in the prospective Kuopio Ischemic Heart Disease Risk Factor Study cohort. Using multivariable regressions adjusting for 22 covariates including total time worked during follow-up, we evaluated the associations of baseline work schedules with 11-year progression of ultrasonographically assessed carotid intima-media thickness (IMT), and their variation by preexisting CVD. Standard daytime work, weekend shifts, and evening/night/rotating shifts were associated with 31%, 37%, and 33% increases in IMT, respectively. Compared to daytime workers, weekend workers experienced a faster progression of carotid atherosclerosis [relative change ratio (RCR) = 1.05, 95% CI: 1.00-1.09)]. This ratio was higher among men who had preexisting CVD. Weekend shifts, more than standard daytime work, appear to accelerate carotid atherosclerosis progression among middle-aged Finnish men, especially those with pre-existing CVD. © 2014 Wiley Periodicals, Inc.

  8. Facility shows benefit of staying single.

    PubMed

    Baillie, Jonathan

    2010-08-01

    Construction of the new 513-bed PFI-funded hospital in Pembury near Tunbridge Wells in Kent, a pound 227 million acute healthcare facility that, on its completion in the autumn of 2011, will be the UK's first to offer 100% single-bed en suite accommodation, is ahead of schedule, "thanks to excellent teamwork and careful planning". During a visit to the now rapidly emerging healthcare facility, located in an Area of Outstanding Natural Beauty (AONB) in a wooded hillside location in the Weald of Kent which Nigel Keen, general manager for the PFI project company, described as "the most attractive site for a hospital I have ever worked on", HEJ editor Jonathan Baillie met key project personnel and discussed the impressive progress made to date.

  9. Candidate soil indicators for monitoring the progress of constructed wetlands toward a natural state: a statistical approach

    USGS Publications Warehouse

    Stapanian, Martin A.; Adams, Jean V.; Fennessy, M. Siobhan; Mack, John; Micacchion, Mick

    2013-01-01

    A persistent question among ecologists and environmental managers is whether constructed wetlands are structurally or functionally equivalent to naturally occurring wetlands. We examined 19 variables collected from 10 constructed and nine natural emergent wetlands in Ohio, USA. Our primary objective was to identify candidate indicators of wetland class (natural or constructed), based on measurements of soil properties and an index of vegetation integrity, that can be used to track the progress of constructed wetlands toward a natural state. The method of nearest shrunken centroids was used to find a subset of variables that would serve as the best classifiers of wetland class, and error rate was calculated using a five-fold cross-validation procedure. The shrunken differences of percent total organic carbon (% TOC) and percent dry weight of the soil exhibited the greatest distances from the overall centroid. Classification based on these two variables yielded a misclassification rate of 11% based on cross-validation. Our results indicate that % TOC and percent dry weight can be used as candidate indicators of the status of emergent, constructed wetlands in Ohio and for assessing the performance of mitigation. The method of nearest shrunken centroids has excellent potential for further applications in ecology.

  10. PROGRESSION OF DISEASES CAUSED BY THE OYSTER PARASITES, PERKINSUS MARINUS AND HAPLOSPORIDIUM NELSONI, IN CRASSOSTREA VIRGINICA ON CONSTRUCTED INTERTIDAL REEFS

    EPA Science Inventory

    The progression of diseases caused by the oyster parasites, Perkinsus marinus and Haplosporidium nelsoni, were evaluated by periodic sampling (May 1994-Dec. 1995) of oysters, Crassostrea virginica, that set on an artificial reef located in the Piankatank River, Virginia, in Augus...

  11. Environmental impact assessment in the Philippines: Progress, problems, and directions for the future

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ross, W.A.

    1994-07-01

    The environmental impact statement (EIS) system of the Philippines is reviewed, identifying progress made in its effective implementation since 1986. Improvement in coverage is noted and real commitment to good environmental impact assessment (EIA) practice is found in those responsible for the EIS system. Project proponents show a modest acceptance of the system. Major problems remaining are: (1) the EIS system is seen as a bureaucratic requirement needed to obtain project approvals; (2) political interference determines the outcome of some environmental reviews; (3) questionable practices by public servants serve to discredit the system; and (4) the treatment of projects inmore » environmentally critical areas is less than satisfactory. Based on the principle that it is essential to establish a credible process seen to work effectively by the public, politicians, the government bureaucracy, and proponents, suggestions for improvement are made. They deal with the treatment of EISs for projects already under construction, EIA training courses, and simple adjustments to the EIS system to focus it on the most important projects.« less

  12. 29 CFR 1910.12 - Construction work.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Construction work. 1910.12 Section 1910.12 Labor... Construction work. (a) Standards. The standards prescribed in part 1926 of this chapter are adopted as... work. Each employer shall protect the employment and places of employment of each of his employees...

  13. 40 CFR 60.1620 - How do I comply with the increment of progress for initiating onsite construction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... or Before August 30, 1999 Model Rule-Increments of Progress § 60.1620 How do I comply with the...

  14. 40 CFR 60.1625 - How do I comply with the increment of progress for completing onsite construction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... or Before August 30, 1999 Model Rule-Increments of Progress § 60.1625 How do I comply with the...

  15. Development and application of the dynamic system doctor to nuclear reactor probabilistic risk assessments.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kunsman, David Marvin; Aldemir, Tunc; Rutt, Benjamin

    2008-05-01

    This LDRD project has produced a tool that makes probabilistic risk assessments (PRAs) of nuclear reactors - analyses which are very resource intensive - more efficient. PRAs of nuclear reactors are being increasingly relied on by the United States Nuclear Regulatory Commission (U.S.N.R.C.) for licensing decisions for current and advanced reactors. Yet, PRAs are produced much as they were 20 years ago. The work here applied a modern systems analysis technique to the accident progression analysis portion of the PRA; the technique was a system-independent multi-task computer driver routine. Initially, the objective of the work was to fuse the accidentmore » progression event tree (APET) portion of a PRA to the dynamic system doctor (DSD) created by Ohio State University. Instead, during the initial efforts, it was found that the DSD could be linked directly to a detailed accident progression phenomenological simulation code - the type on which APET construction and analysis relies, albeit indirectly - and thereby directly create and analyze the APET. The expanded DSD computational architecture and infrastructure that was created during this effort is called ADAPT (Analysis of Dynamic Accident Progression Trees). ADAPT is a system software infrastructure that supports execution and analysis of multiple dynamic event-tree simulations on distributed environments. A simulator abstraction layer was developed, and a generic driver was implemented for executing simulators on a distributed environment. As a demonstration of the use of the methodological tool, ADAPT was applied to quantify the likelihood of competing accident progression pathways occurring for a particular accident scenario in a particular reactor type using MELCOR, an integrated severe accident analysis code developed at Sandia. (ADAPT was intentionally created with flexibility, however, and is not limited to interacting with only one code. With minor coding changes to input files, ADAPT can be linked to other such codes.) The results of this demonstration indicate that the approach can significantly reduce the resources required for Level 2 PRAs. From the phenomenological viewpoint, ADAPT can also treat the associated epistemic and aleatory uncertainties. This methodology can also be used for analyses of other complex systems. Any complex system can be analyzed using ADAPT if the workings of that system can be displayed as an event tree, there is a computer code that simulates how those events could progress, and that simulator code has switches to turn on and off system events, phenomena, etc. Using and applying ADAPT to particular problems is not human independent. While the human resources for the creation and analysis of the accident progression are significantly decreased, knowledgeable analysts are still necessary for a given project to apply ADAPT successfully. This research and development effort has met its original goals and then exceeded them.« less

  16. [New materia medica project: synthetic biology based bioactive metabolites research in medicinal plant].

    PubMed

    Wang, Yong

    2017-03-25

    In the last decade, synthetic biology research has been gradually transited from monocellular parts or devices toward more complex multicellular systems. The emerging plant synthetic biology is regarded as the "next chapter" of synthetic biology. The complex and diverse plant metabolism as the entry point, plant synthetic biology research not only helps us understand how real life is working, but also facilitates us to learn how to design and construct more complex artificial life. Bioactive compounds innovation and large-scale production are expected to be breakthrough with the redesigned plant metabolism as well. In this review, we discuss the research progress in plant synthetic biology and propose the new materia medica project to lift the level of traditional Chinese herbal medicine research.

  17. Verbal and nonverbal behavior of ability-grouped dyads

    NASA Astrophysics Data System (ADS)

    Jones, M. Gail; Carter, Glenda

    In this study we describe the social interactions of ability-grouped dyads as they constructed knowledge of balance concepts to elucidate the relationship between interactions and conceptual growth. The verbal and nonverbal behaviors of 30 fifth-grade students were recorded as they completed three activities related to balance. These student interactions were examined within a framework of social cognition. For each dyad, characteristics of ability-grouped dyads were identified. Results revealed that high-achieving students effectively used prior experiences, maintained focus on the learning task, and were able to manipulate the equipment effectively to construct knowledge. Low-achieving students exhibited off-task behavior, lacked a metacognitive framework for organizing the learning tasks, centered on irrelevant features of the equipment, and were unable to use language effectively to mediate learning. Within low-high student dyads, high-achieving students typically modeled thinking processes and strategies for manipulating equipment. In addition, they focused the low-achieving students on the components of the tasks while verbally monitoring their progress, thus enabling low students to identify the critical features necessary for concept construction. These results highlighted the differences that students have in the use of language and tools. Low students' inefficient use of tools has implications for the ways science teachers structure lessons and group students for laboratory work.Received: 8 March 1993; Revised: 6 January 1994;

  18. The development of the drive object concept in Freud's work: 1905-1915.

    PubMed

    Compton, A

    1985-01-01

    In 1905 Freud established the idea of an object of an instinctual drive as the basic object concept of psychoanalysis. He also introduced the derivative concepts of object directedness, object choice, and object finding. While taking these steps he simultaneously deemphasized the importance of drive objects in sexual life, contradicted himself on whether drives are autoerotic or object-directed in infancy, and made incompatible statements about whether or not object choice occurs before puberty. Freud's clinical work, reflected especially in the major case reports and a series of papers on fantasy, led to an apparent recognition of complexity in the mental life of children far greater than had been described earlier. The increased attention to and appreciation of mental content in childhood especially augmented Freud's understanding of the role of drive objects, object directedness, and object choice in infancy. This, in turn, led him to postulate a sequence of organizations of sexual life, named according to the zonal drive source plus the mode of object directedness, a process of theory development that continued through 1924. Object choice and, to a lesser extent, object directedness are concepts derived from and dependent upon the concept of drive object. Both require, however, explanatory constructs besides drive constructs. In 1915 Freud defined the term "object" in the context of stating his drive theory. Freud used the term object with several new modifying words during this decade. No new object concept was introduced, however, in this work, although some steps in that direction appeared to be in progress.

  19. Tubular Tissues and Organs of Human Body--Challenges in Regenerative Medicine.

    PubMed

    Góra, Aleksander; Pliszka, Damian; Mukherjee, Shayanti; Ramakrishna, Seeram

    2016-01-01

    Tissue engineering of tubular organs such as the blood vessel, trachea gastrointestinal tract, urinary tract are of the great interest due to the high amount of surgeries performed annually on those organs. Development in tissue engineering in recent years and promising results, showed need to investigate more complex constructs that need to be designed in special manner. Stent technology remain the most widely used procedure to restore functions of tubular tissues after cancer treatment, or after organ removal due to traumatic accidents. Tubular structures like blood vessels, intestines, and trachea have to work in specific environment at the boundary of the liquids, solids or air and surrounding tissues and ensure suitable separation between them. This brings additional challenges in tissue engineering science in order to construct complete organs by using combinations of various cells along with the support material systems. Here we give a comprehensive review of the tubular structures of the human body, in perspective of the current methods of treatment and progress in regenerative medicine that aims to develop fully functioning organs of tubular shape. Extensive analysis of the available literature has been done focusing on materials and methods of creations of such organs. This work describes the attempts to incorporate growth factors and drugs within the scaffolds to ensure localized drug release and enhance vascularization of the organ by attracting blood vessels to the site of implantation.

  20. Laboratory information management system for membrane protein structure initiative--from gene to crystal.

    PubMed

    Troshin, Petr V; Morris, Chris; Prince, Stephen M; Papiz, Miroslav Z

    2008-12-01

    Membrane Protein Structure Initiative (MPSI) exploits laboratory competencies to work collaboratively and distribute work among the different sites. This is possible as protein structure determination requires a series of steps, starting with target selection, through cloning, expression, purification, crystallization and finally structure determination. Distributed sites create a unique set of challenges for integrating and passing on information on the progress of targets. This role is played by the Protein Information Management System (PIMS), which is a laboratory information management system (LIMS), serving as a hub for MPSI, allowing collaborative structural proteomics to be carried out in a distributed fashion. It holds key information on the progress of cloning, expression, purification and crystallization of proteins. PIMS is employed to track the status of protein targets and to manage constructs, primers, experiments, protocols, sample locations and their detailed histories: thus playing a key role in MPSI data exchange. It also serves as the centre of a federation of interoperable information resources such as local laboratory information systems and international archival resources, like PDB or NCBI. During the challenging task of PIMS integration, within the MPSI, we discovered a number of prerequisites for successful PIMS integration. In this article we share our experiences and provide invaluable insights into the process of LIMS adaptation. This information should be of interest to partners who are thinking about using LIMS as a data centre for their collaborative efforts.

  1. Why open drug discovery needs four simple rules for licensing data and models.

    PubMed

    Williams, Antony J; Wilbanks, John; Ekins, Sean

    2012-01-01

    When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves.

  2. Application of the National Assessment of Educational Progress Philosophy in San Bernardino City Unified School District.

    ERIC Educational Resources Information Center

    Bonney, Lewis A.

    the steps taken by a large urban school district to develop and implement an objectives-based curriculum with criterion-referenced assessment of student progress are described. These steps include: goal setting, development of curriculum objectives, construction of assessment exercises, matrix sampling in test administration, and reporting of…

  3. Comprehensive analysis of the functional microRNA–mRNA regulatory network identifies miRNA signatures associated with glioma malignant progression

    PubMed Central

    Li, Yongsheng; Xu, Juan; Chen, Hong; Bai, Jing; Li, Shengli; Zhao, Zheng; Shao, Tingting; Jiang, Tao; Ren, Huan; Kang, Chunsheng; Li, Xia

    2013-01-01

    Glioma is the most common and fatal primary brain tumour with poor prognosis; however, the functional roles of miRNAs in glioma malignant progression are insufficiently understood. Here, we used an integrated approach to identify miRNA functional targets during glioma malignant progression by combining the paired expression profiles of miRNAs and mRNAs across 160 Chinese glioma patients, and further constructed the functional miRNA–mRNA regulatory network. As a result, most tumour-suppressive miRNAs in glioma progression were newly discovered, whose functions were widely involved in gliomagenesis. Moreover, three miRNA signatures, with different combinations of hub miRNAs (regulations≥30) were constructed, which could independently predict the survival of patients with all gliomas, high-grade glioma and glioblastoma. Our network-based method increased the ability to identify the prognostic biomarkers, when compared with the traditional method and random conditions. Hsa-miR-524-5p and hsa-miR-628-5p, shared by these three signatures, acted as protective factors and their expression decreased gradually during glioma progression. Functional analysis of these miRNA signatures highlighted their critical roles in cell cycle and cell proliferation in glioblastoma malignant progression, especially hsa-miR-524-5p and hsa-miR-628-5p exhibited dominant regulatory activities. Therefore, network-based biomarkers are expected to be more effective and provide deep insights into the molecular mechanism of glioma malignant progression. PMID:24194606

  4. Administration of Progress Payments at Defense Contract Management District-West

    DTIC Science & Technology

    1993-08-05

    the progress payment is calculated from the contractor’s incurred cost, the actual amount payable is always limited by the fair value of the...progress payments exceed the fair value of undelivered work. In addition to assessing the validity of the EAC relative to the progress payment request...were overpaid because Air Force Plant Representative Offices incorrectly calculated progress payment reductions for fair value of remaining work

  5. Coastal Human Actions on Natural Morph-dynamics around RIA of FOZ (NW Spain). Risk Analysis.

    NASA Astrophysics Data System (ADS)

    Diez, J. Javier; Veiga, Efren M.; Rodriguez, Fernando

    2015-04-01

    This work approaches the natural littoral processes and their changes induced by human activities around the Cantabrian RIA of FOZ (Galicia, NW Spain). Ria is a specific Spanish term for referring the estuary figured on the sea flooded mouth of a river valley. Although located in Galicia the RIA of FOZ is a Cantabrian Ria. The "Cantabrian rias" clearly differ from the "Galician rias" in their lower degree of tectonic complexity, in their smaller dimensions and in their more advanced current state of infilling (Diez, 1996). While Galician is a Pacific coast Cantabrian was generated as a mainly Atlantic coast. The sedimentary deposits of the Cantabrian rias are mainly from marine origin, being from fluvial origin (Asensio, 1979) just the finest components. The predominant Cantabrian littoral transport goes eastwards and, as consequence of it, the sedimentary littoral spits closing the mouths in coasts normally grow in the same sense. But there are many cases, like in the Ria of Foz, where the spit progresses in an apparent westwards atypical way. This work shows that it is due to combined wind wave phenomena of refraction, diffraction and reflection, which will be detailed. But the human activities interfere in these natural processes. Different port constructions have been made in the Ria of Foz from 1931 to 1977. Their final effects in the morph-dynamics obligate to introduce one construction for regenerate the spit in 1986. The performance, effectiveness and impact of all these port constructions are studied in detail and what are their influences in natural processes for finally applying this knowledge in risks management. Keywords: Rias, Littoral processes, Coastal morph-dynamics, Human induced driving, Risk management.

  6. Life cycle performances of log wood applied for soil bioengineering constructions

    NASA Astrophysics Data System (ADS)

    Kalny, Gerda; Strauss-Sieberth, Alexandra; Strauss, Alfred; Rauch, Hans Peter

    2016-04-01

    Nowadays there is a high demand on engineering solutions considering not only technical aspects but also ecological and aesthetic values. Soil bioengineering is a construction technique that uses biological components for hydraulic and civil engineering solutions. Soil bioengineering solutions are based on the application of living plants and other auxiliary materials including among others log wood. This kind of construction material supports the soil bioengineering system as long as the plants as living construction material overtake the stability function. Therefore it is important to know about the durability and the degradation process of the wooden logs to retain the integral performance of a soil bio engineering system. These aspects will be considered within the framework of the interdisciplinary research project „ELWIRA Plants, wood, steel and concrete - life cycle performances as construction materials". Therefore field investigations on soil bioengineering construction material, specifically European Larch wood logs, of different soil bioengineering structures at the river Wien have been conducted. The drilling resistance as a parameter for particular material characteristics of selected logs was measured and analysed. The drilling resistance was measured with a Rinntech Resistograph instrument at different positions of the wooden logs, all surrounded with three different backfills: Fully surrounded with air, with earth contact on one side and near the water surface in wet-dry conditions. The age of the used logs ranges from one year old up to 20 year old. Results show progress of the drilling resistance throughout the whole cross section as an indicator to assess soil bioengineering construction material. Logs surrounded by air showed a higher drilling resistance than logs with earth contact and the ones exposed to wet-dry conditions. Hence the functional capability of wooden logs were analysed and discussed in terms of different levels of degradation. The results contribute to a sustainable and resource conserving handling with building materials in frame of construction and maintenance works of soil bioengineering structures.

  7. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  8. How collaboration in therapy becomes therapeutic: the therapeutic collaboration coding system.

    PubMed

    Ribeiro, Eugénia; Ribeiro, António P; Gonçalves, Miguel M; Horvath, Adam O; Stiles, William B

    2013-09-01

    The quality and strength of the therapeutic collaboration, the core of the alliance, is reliably associated with positive therapy outcomes. The urgent challenge for clinicians and researchers is constructing a conceptual framework to integrate the dialectical work that fosters collaboration, with a model of how clients make progress in therapy. We propose a conceptual account of how collaboration in therapy becomes therapeutic. In addition, we report on the construction of a coding system - the therapeutic collaboration coding system (TCCS) - designed to analyse and track on a moment-by-moment basis the interaction between therapist and client. Preliminary evidence is presented regarding the coding system's psychometric properties. The TCCS evaluates each speaking turn and assesses whether and how therapists are working within the client's therapeutic zone of proximal development, defined as the space between the client's actual therapeutic developmental level and their potential developmental level that can be reached in collaboration with the therapist. We applied the TCCS to five cases: a good and a poor outcome case of narrative therapy, a good and a poor outcome case of cognitive-behavioural therapy, and a dropout case of narrative therapy. The TCCS offers markers that may help researchers better understand the therapeutic collaboration on a moment-to-moment basis and may help therapists better regulate the relationship. © 2012 The British Psychological Society.

  9. 48 CFR 922.804-2 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontractors for work to be performed in the specified geographical areas. (b) Other nonexempt construction... affirmative action steps to be taken by the offeror in connection with all work under the contract. Such... each craft involved in the performance of the contract work. All solicitations for construction...

  10. The role of occupational medicine in assessing work limitation: A cross-sectional study on construction workers over a five-year period in Croatia.

    PubMed

    Božić, Tajana; Meštrović, Tomislav; Profozić, Zora; Profozić, Velimir

    2017-01-01

    Maintaining adequate working ability of construction workers is of considerable importance for society, as the construction sector is burdened with high prevalence of work-related diseases and health-issues. To determine the number and age of construction workers in Croatia with temporary or permanent work limitation status, as well as to identify the most common health causes of such work limitation. A retrospective cross-sectional study was performed using the data from 2534 construction workers, aged between 18 and 65 years, who underwent standardized routine occupational health examinations between 2011 and 2015. Thorough medical history and medical record reviews, blood and urine analyses, vision parameters and hearing range evaluation, as well as mental health assessment were conducted on every study participant. A total of 210 construction workers (8.29%) received occupational/work limitation status (either temporary or permanent). Four main categories of work limitation were high blood pressure, disorders of the liver and digestive system, hearing loss and amblyopia, comprising 61.69% of all diagnoses. A total of 37.62% of workers with work limitation status had two or more different diagnoses (i.e. co-morbid conditions). Those with work limitation (either temporary or long-term) were significantly older than those fit enough to work (p-value <0.00001). This type of organized screening represents a significant preventative effort in the construction industry, as workers may become more cognizant of the conditions that may affect their work ability.

  11. Cultural, Social, and Economic Capital Constructs in International Assessments: An Evaluation Using Exploratory Structural Equation Modeling

    ERIC Educational Resources Information Center

    Caro, Daniel H.; Sandoval-Hernández, Andrés; Lüdtke, Oliver

    2014-01-01

    The article employs exploratory structural equation modeling (ESEM) to evaluate constructs of economic, cultural, and social capital in international large-scale assessment (LSA) data from the Progress in International Reading Literacy Study (PIRLS) 2006 and the Programme for International Student Assessment (PISA) 2009. ESEM integrates the…

  12. On the Development of a Deterministic Three-Dimensional Radiation Transport Code

    NASA Technical Reports Server (NTRS)

    Rockell, Candice; Tweed, John

    2011-01-01

    Since astronauts on future deep space missions will be exposed to dangerous radiations, there is a need to accurately model the transport of radiation through shielding materials and to estimate the received radiation dose. In response to this need a three dimensional deterministic code for space radiation transport is now under development. The new code GRNTRN is based on a Green's function solution of the Boltzmann transport equation that is constructed in the form of a Neumann series. Analytical approximations will be obtained for the first three terms of the Neumann series and the remainder will be estimated by a non-perturbative technique . This work discusses progress made to date and exhibits some computations based on the first two Neumann series terms.

  13. Pellets for fusion reactor refueling. Annual progress report, January 1, 1976--December 31, 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turnbull, R. J.; Kim, K.

    1977-01-01

    The purpose of this research is to test the feasibility of refueling fusion reactors using solid pellets composed of fuel elements. A solid hydrogen pellet generator has been constructed and experiments have been done to inject the pellets into the ORMAK Tokamak. A theory has been developed to describe the pellet ablation in the plasma, and an excellent agreement has been found between the theory and the experiment. Techniques for charging the pellets have been developed in order to accelerate and control them. Other works currently under way include the development of techniques for accelerating the pellets for refueling purpose.more » Evaluation of electrostatic acceleration has also been performed.« less

  14. ML Construction Progress

    NASA Image and Video Library

    2014-12-17

    Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A crane is being used to move scaffolding, or work platforms, around the base of the tower on the ML to continue upgrades and modifications to the structure. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. The ML is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  15. Pad 39B Flame Trench Brick Work

    NASA Image and Video Library

    2016-10-26

    Progress on the new brick walls of the north side of the flame trench at Launch Pad 39B is seen in a view from the top of the pad at NASA’s Kennedy Space Center in Florida. Construction workers with J.P. Donovan of Rockledge, Florida, continue to install new heat-resistant bricks on the concrete walls. The Pad B flame trench is being refurbished to support the launch of NASA’s Space Launch System rocket. The Ground Systems Development and Operations (GSDO) Program at Kennedy is helping transform the space center into a multi-user spaceport and prepare for Exploration Mission 1, deep-space missions, and the journey to Mars. For more information about GSDO, visit: http://www.nasa.gov/groundsystems.

  16. Smart Houses

    NASA Technical Reports Server (NTRS)

    1987-01-01

    GWS takes plans for a new home and subjects them to intensive computerized analysis that does 10,000 calculations relative to expected heat loss and heat gain, then provides specifications designed specifically for each structure as to heating, cooling, ventilation and insulation. As construction progresses, GWS inspects the work of the electrical, plumbing and insulation contractors and installs its own Smart House Radiant Barrier. On completion of the home, GWS technicians use a machine that creates a vacuum in the house and enables computer calculation of the air exchanged, a measure of energy efficiency. Key factor is the radiant barrier, borrowed from the Apollo program. This is an adaptation of a highly effective aluminized heat shield as a radiation barrier holding in or keeping out heat, cold air and water vapor.

  17. 40 CFR 60.2830 - When must I submit the notifications of achievement of increments of progress?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Model Rule-Air Curtain Incinerators § 60.2830 When... increments of progress must be postmarked no later than 10 business days after the compliance date for the...

  18. Work-based physiological assessment of physically-demanding trades: a methodological overview.

    PubMed

    Taylor, Nigel A S; Groeller, Herb

    2003-03-01

    Technological advances, modified work practices, altered employment strategies, work-related injuries, and the rise in work-related litigation and compensation claims necessitate ongoing trade analysis research. Such research enables the identification and development of gender- and age-neutral skills, physiological attributes and employment standards required to satisfactorily perform critical trade tasks. This paper overviews a methodological approach which may be adopted when seeking to establish trade-specific physiological competencies for physically-demanding trades (occupations). A general template is presented for conducting a trade analyses within physically-demanding trades, such as those encountered within military or emergency service occupations. Two streams of analysis are recommended: the trade analysis and the task analysis. The former involves a progressive dissection of activities and skills into a series of specific tasks (elements), and results in a broad approximation of the types of trade duties, and the links between trade tasks. The latter, will lead to the determination of how a task is performed within a trade, and the physiological attributes required to satisfactorily perform that task. The approach described within this paper is designed to provide research outcomes which have high content, criterion-related and construct validities.

  19. 14 CFR 151.53 - Performance of construction work: Labor requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Labor... § 151.53 Performance of construction work: Labor requirements. A sponsor who is required to include in a... during the performance of work under the contract, to the extent necessary to determine whether the...

  20. Class Construction: White Working-Class Student Identity in the New Millennium

    ERIC Educational Resources Information Center

    Freie, Carrie

    2007-01-01

    "Class Construction" explores class, racial, and gender identity construction among white, working-class students. Delving into River City High School, Freie asks what happens to the adolescent children of working-class families when economic changes such as globalization and technological advancements have altered the face of working-class jobs.…

  1. Behavior of wet precast beam column connections under progressive collapse scenario: an experimental study

    NASA Astrophysics Data System (ADS)

    Nimse, Rohit B.; Joshi, Digesh D.; Patel, Paresh V.

    2014-12-01

    Progressive collapse denotes a failure of a major portion of a structure that has been initiated by failure of a relatively small part of the structure such as failure of any vertical load carrying element (typically columns). Failure of large part of any structure will results into substantial loss of human lives and natural resources. Therefore, it is important to prevent progressive collapse which is also known as disproportionate collapse. Nowadays, there is an increasing trend toward construction of buildings using precast concrete. In precast concrete construction, all the components of structures are produced in controlled environment and they are being transported to the site. At site such individual components are connected appropriately. Connections are the most critical elements of any precast structure, because in past major collapse of precast structure took place because of connection failure. In this study, behavior of three different 1/3rd scaled wet precast beam column connections under progressive collapse scenario are studied and its performance is compared with monolithic connection. Precast connections are constructed by adopting different connection detailing at the junction by considering reinforced concrete corbel for two specimens and steel billet for one specimen. Performance of specimen is evaluated on the basis of ultimate load carrying capacity, maximum deflection and deflection measured along the span of the beam. From the results, it is observed that load carrying capacity and ductility of precast connections considered in this study are more than that of monolithic connections.

  2. Fully Parallel MHD Stability Analysis Tool

    NASA Astrophysics Data System (ADS)

    Svidzinski, Vladimir; Galkin, Sergei; Kim, Jin-Soo; Liu, Yueqiang

    2014-10-01

    Progress on full parallelization of the plasma stability code MARS will be reported. MARS calculates eigenmodes in 2D axisymmetric toroidal equilibria in MHD-kinetic plasma models. It is a powerful tool for studying MHD and MHD-kinetic instabilities and it is widely used by fusion community. Parallel version of MARS is intended for simulations on local parallel clusters. It will be an efficient tool for simulation of MHD instabilities with low, intermediate and high toroidal mode numbers within both fluid and kinetic plasma models, already implemented in MARS. Parallelization of the code includes parallelization of the construction of the matrix for the eigenvalue problem and parallelization of the inverse iterations algorithm, implemented in MARS for the solution of the formulated eigenvalue problem. Construction of the matrix is parallelized by distributing the load among processors assigned to different magnetic surfaces. Parallelization of the solution of the eigenvalue problem is made by repeating steps of the present MARS algorithm using parallel libraries and procedures. Initial results of the code parallelization will be reported. Work is supported by the U.S. DOE SBIR program.

  3. Surface physics with cold and thermal neutron reflectometry. Progress report, April 1, 1991--September 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steyerl, A.

    1993-09-01

    Within the past two and one half years of the project ``Surface Physics With Cold and Thermal Neutron Reflectometry`` a new thermal neutron reflectometer was constructed at the Rhode Island Nuclear Science Center (RINSC). It was used to study various liquid and solid surfaces. Furthermore, neutron reflection experiments were be un at different laboratories in collaboration with Dr. G.P. Fetcher (at Argonne National Laboratory), Dr. T. Russell (IBM Almaden) and Drs. S.K. Satija and A. Karim (at the National Institute for Standards and Technology). The available resources allowed partial construction of an imaging system for ultracold neutrons. It is expectedmore » to provide an extremely high resolution in momentum and energy transfer in surface studies using neutron reflectometry. Much of the work reported here was motivated by the possibility of later implementation at the planned Advanced Neutron Source at Oak Ridge. In a separate project the first concrete plans for an intense source of ultracold neutrons for the Advanced Neutron Source were developed.« less

  4. Around Marshall

    NASA Image and Video Library

    1977-04-12

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built.Pictured is an experiment where the astronaut is required to move a large object which weighed 19,000 pounds. It was moved with realitive ease once the astronaut became familiar with his environment and his near weightless condition. Experiments of this nature provided scientists with the information needed regarding weight and mass allowances astronauts could manage in preparation for building a permanent space station in the future.

  5. Neutral Buoyancy Test NB-14 Large Space Structure Assembly

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built.Pictured is an experiment where the astronaut is required to move a large object which weighed 19,000 pounds. It was moved with realitive ease once the astronaut became familiar with his environment and his near weightless condition. Experiments of this nature provided scientists with the information needed regarding weight and mass allowances astronauts could manage in preparation for building a permanent space station in the future.

  6. The radioactive ion beams facility project for the legnaro laboratories

    NASA Astrophysics Data System (ADS)

    Tecchio, Luigi B.

    1999-04-01

    In the frame work of the Italian participation to the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involving in the design and construction of prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has been already financially supported and the work is actually in progress. In this context, the LNL has been proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by using the ISOL method. The final goal consists in the production of neutron rich RIBs with masses ranging from 80 to 160 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is proposed to be developed in about 10 years from now and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999-2003). In such period of time is proposed the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production, to the BNCT applications and to the neutron physics. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed.

  7. Around Marshall

    NASA Image and Video Library

    1978-07-21

    Once the United States' space program had progressed from Earth's orbit into outerspace, the prospect of building and maintaining a permanent presence in space was realized. To accomplish this feat, NASA launched a temporary workstation, Skylab, to discover the effects of low gravity and weightlessness on the human body, and also to develop tools and equipment that would be needed in the future to build and maintain a more permanent space station. The structures, techniques, and work schedules had to be carefully designed to fit this unique construction site. The components had to be lightweight for transport into orbit, yet durable. The station also had to be made with removable parts for easy servicing and repairs by astronauts. All of the tools necessary for service and repairs had to be designed for easy manipulation by a suited astronaut. And construction methods had to be efficient due to limited time the astronauts could remain outside their controlled environment. In lieu of all the specific needs for this project, an environment on Earth had to be developed that could simulate a low gravity atmosphere. A Neutral Buoyancy Simulator (NBS) was constructed by NASA Marshall Space Flight Center (MSFC) in 1968. Since then, NASA scientists have used this facility to understand how humans work best in low gravity and also provide information about the different kinds of structures that can be built. Included in the plans for the space station was a space telescope. This telescope would be attached to the space station and directed towards outerspace. Astronomers hoped that the space telescope would provide a look at space that is impossible to see from Earth because of Earth's atmosphere and other man made influences. Pictured is a large structure that is being used as the antenna base for the space telescope.

  8. Does American Social Work Have a Progressive Tradition?

    ERIC Educational Resources Information Center

    Murdach, Allison D.

    2010-01-01

    Social work authors in the 1950s claimed progressivism as a unique social work "tradition" and set of values, and this historical interpretation has influenced many versions of social work history since that time. Today, other voices in the profession claim various divergent traditions for social work and note that the progressive tradition has…

  9. 7 CFR Exhibit B-3 to Subpart I of... - Pre-Construction and Construction Phase Breakdown

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical... self-help grantees have several groups of families in various stages of progress during the period of... guide, the project staff selects the total percentage pertinent to the stage the self-help group is in...

  10. Structured Constructs Models Based on Change-Point Analysis

    ERIC Educational Resources Information Center

    Shin, Hyo Jeong; Wilson, Mark; Choi, In-Hee

    2017-01-01

    This study proposes a structured constructs model (SCM) to examine measurement in the context of a multidimensional learning progression (LP). The LP is assumed to have features that go beyond a typical multidimentional IRT model, in that there are hypothesized to be certain cross-dimensional linkages that correspond to requirements between the…

  11. Curriculum in Conflict: Social Visions, Educational Agendas, and Progressive School Reform.

    ERIC Educational Resources Information Center

    Beyer, Landon E.; Liston, Daniel P.

    The construction and reconstruction of public school and college curricula cannot be understood without an understanding of how they are intimately tied to larger social currents and cross-currents. This book attempts to provide a coherent yet inconclusive synthesis of the progressive tradition that challenges both the curricular status quo and…

  12. Synchronization of construction, replenishment and leasing cycles with account of wave dynamics of innovation cycles in the construction and transport field

    NASA Astrophysics Data System (ADS)

    Alekseeva, Tatyana

    2017-10-01

    The article considers the contradictive nature of the basic cycles of the growth in construction, the core of which are construction cycles, replenishment cycles of the active part of fixed assets, innovation and investment cycles. All of the listed cycles objectively thwart the science and technology progress in construction. There are presented results of the study of finance leasing as an effective tool, that provides time reduction of the innovation replenishment cycle of the active part of fixed assets in construction. It takes into account the development and implementation terms of construction investment projects in order to timely support the innovation wave and enhance its efficiency in construction for a rapid transition of the construction investment complex and national economy to a new vector of growth.

  13. Taiwanese antennas for the Sub-Millimeter Array: a progress report

    NASA Astrophysics Data System (ADS)

    Raffin, Phillippe A.; Liu, Ching-Tang; Cervera, Mathieu; Chang, Chi-Ling; Chen, Ming-Tang; Lee, Cheng-Ching; Lee, Typhoon; Lo, Kwok-Yung; Ma, Rwei-Ping; Martin, Robert N.; Martin-Cocher, Pierre; Ong, Ching-Long; Park, Yong-Sun; Tsai, Rong-Den; Wu, Enboa; Yang, Shun-Cheng; Yang, Tien-Szu

    2000-07-01

    The Academia Sinica, Institute for Astronomy and Astrophysics (ASIAA) is building two antennas to be added to the six antennas of the Sub-Millimeter Array (SMA) of the Smithsonian Astrophysical Observatory (SAO). The antennas have been designed at SAO and are currently under construction at Mauna Kea. ASIAA's two antennas are made in Taiwan from parts manufactured locally and imported from Europe and from the USA. This report will focus on the manufacturing and testing of 2 major components: the alidade and the reflector. We will emphasize the work done on the composite parts used in the 6- meter reflectors, namely the carbon fiber tubes for the backup structure, the carbon fiber legs of the quadrupod and the composite central hub. We will discuss the modal testing and pointing tests of the antennas. Finally this report will show how the Taiwanese industry was able to respond to the high manufacturing standards required to build sub-millimeter antennas. The design and manufacturing capabilities of the Aeronautical Research Laboratories and China Shipbuilding Corporation have made possible the construction of the telescopes in Taiwan.

  14. Metamaterials based on the phase transition of VO2

    NASA Astrophysics Data System (ADS)

    Liu, Hongwei; Lu, Junpeng; Renshaw Wang, Xiao

    2018-01-01

    In this article, we present a comprehensive review on recent research progress in design and fabrication of active tunable metamaterials and devices based on phase transition of VO2. Firstly, we introduce mechanisms of the metal-to-insulator phase transition (MIPT) in VO2 investigated by ultrafast THz spectroscopies. By analyzing the THz spectra, the evolutions of MIPT in VO2 induced by different external excitations are described. The superiorities of using VO2 as building blocks to construct highly tunable metamaterials are discussed. Subsequently, the recently demonstrated metamaterial devices based on VO2 are reviewed. These metamaterials devices are summarized and described in the categories of working frequency. In each working frequency range, representative metamaterials based on VO2 with different architectures and functionalities are reviewed and the contributions of the MIPT of VO2 are emphasized. Finally, we conclude the recent reports and provide a prospect on the strategies of developing future tunable metamaterials based on VO2.

  15. Gender stereotypes among women engineering and technology students in the UK: lessons from career choice narratives

    NASA Astrophysics Data System (ADS)

    Powell, Abigail; Dainty, Andrew; Bagilhole, Barbara

    2012-12-01

    In the UK, women remain under-represented in engineering and technology (E&T). Research has, therefore, investigated barriers and solutions to women's recruitment, retention and progression. Recruitment into the sector may be supported by exploring the career decisions of women and men who have chosen to study E&T. Triangulating quantitative and qualitative data from E&T students at a UK university, this paper examines the gendered nature of career choice narratives. It finds that women often maintain contradictory views; upholding gendered stereotypes about women's suitability for the so-called masculine work, yet also subscribing to ideals that the sector is accessible to all who wish to work in it. This is explained using an individualist framework in which women construct an autonomous sense of self, yet are also shaped by a gendered self. Women's discourse around career choice, therefore, reveals the problematic nature of gender norms for achieving gender equity in E&T.

  16. Multimodal nanoparticle imaging agents: design and applications

    NASA Astrophysics Data System (ADS)

    Burke, Benjamin P.; Cawthorne, Christopher; Archibald, Stephen J.

    2017-10-01

    Molecular imaging, where the location of molecules or nanoscale constructs can be tracked in the body to report on disease or biochemical processes, is rapidly expanding to include combined modality or multimodal imaging. No single imaging technique can offer the optimum combination of properties (e.g. resolution, sensitivity, cost, availability). The rapid technological advances in hardware to scan patients, and software to process and fuse images, are pushing the boundaries of novel medical imaging approaches, and hand-in-hand with this is the requirement for advanced and specific multimodal imaging agents. These agents can be detected using a selection from radioisotope, magnetic resonance and optical imaging, among others. Nanoparticles offer great scope in this area as they lend themselves, via facile modification procedures, to act as multifunctional constructs. They have relevance as therapeutics and drug delivery agents that can be tracked by molecular imaging techniques with the particular development of applications in optically guided surgery and as radiosensitizers. There has been a huge amount of research work to produce nanoconstructs for imaging, and the parameters for successful clinical translation and validation of therapeutic applications are now becoming much better understood. It is an exciting time of progress for these agents as their potential is closer to being realized with translation into the clinic. The coming 5-10 years will be critical, as we will see if the predicted improvement in clinical outcomes becomes a reality. Some of the latest advances in combination modality agents are selected and the progression pathway to clinical trials analysed. This article is part of the themed issue 'Challenges for chemistry in molecular imaging'.

  17. Problems in particle theory. Technical report - 1993--1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adler, S.L.; Wilczek, F.

    This report is a progress report on the work of two principal investigators in the broad area of particle physics theory, covering their personal work, that of their coworkers, and their proposed work for the future. One author has worked in the past on various topics in field theory and particle physics, among them current algebras, the physics of neutrino induced reactions, quantum electrodynamics (including strong magnetic field processes), the theory of the axial-vector current anomaly, topics in quantum gravity, and nonlinear models for quark confinement. While much of his work has been analytical, all of the projects listed abovemore » (except for the work on gravity) had phases which required considerable computer work as well. Over the next several years, he proposes to continue or initiate research on the following problems: (1) Acceleration algorithms for the Monte Carlo analysis of lattice field and gauge theories, and more generally, new research in computational neuroscience and pattern recognition. (2) Construction of quaternionic generalizations of complex quantum mechanics and field theory, and their application to composite models of quarks and leptons, and to the problem of unifying quantum theories of matter with general relativity. One author has worked on problems in exotic quantum statistics and its applications to condensed matter systems. His work has also continued on the quantum theory of black holes. This has evolved toward understanding properties of quantum field theory and string theory in incomplete regions of flat space.« less

  18. Twenty years of workers' compensation costs due to falls from height among union carpenters, Washington state.

    PubMed

    Lipscomb, Hester J; Schoenfisch, Ashley L; Cameron, Wilfrid; Kucera, Kristen L; Adams, Darrin; Silverstein, Barbara A

    2014-09-01

    Falls from height (FFH) are a longstanding, serious problem in construction. We report workers' compensation (WC) payments associated with FFH among a cohort (n = 24,830; 1989-2008) of carpenters. Mean/median payments, cost rates, and adjusted rate ratios based on hours worked were calculated using negative-binomial regression. Over the 20-year period FFH accounted for $66.6 million in WC payments or $700 per year for each full-time equivalent (2,000 hr of work). FFH were responsible for 5.5% of injuries but 15.1% of costs. Cost declines were observed, but not monotonically. Reductions were more pronounced for indemnity than medical care. Mean costs were 2.3 times greater among carpenters over 50 than those under 30; cost rates were only modestly higher. Significant progress has been made in reducing WC payments associated with FFH in this cohort particularly through 1996; primary gains reflect reduction in frequency of falls. FFH that occur remain costly. © 2014 Wiley Periodicals, Inc.

  19. Astroparticle Physics: Detectors for Cosmic Rays

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salazar, Humberto; Villasenor, Luis

    2006-09-25

    We describe the work that we have done over the last decade to design and construct instruments to measure properties of cosmic rays in Mexico. We describe the measurement of the muon lifetime and the ratio of positive to negative muons in the natural background of cosmic ray muons at 2000 m.a.s.l. Next we describe the detection of decaying and crossing muons in a water Cherenkov detector as well as a technique to separate isolated particles. We also describe the detection of isolated muons and electrons in a liquid scintillator detector and their separation. Next we describe the detection ofmore » extensive air showers (EAS) with a hybrid detector array consisting of water Cherenkov and liquid scintillator detectors, located at the campus of the University of Puebla. Finally we describe work in progress to detect EAS at 4600 m.a.s.l. with a water Cherenkov detector array and a fluorescence telescope at the Sierra Negra mountain.« less

  20. Robust Classification and Segmentation of Planar and Linear Features for Construction Site Progress Monitoring and Structural Dimension Compliance Control

    NASA Astrophysics Data System (ADS)

    Maalek, R.; Lichti, D. D.; Ruwanpura, J.

    2015-08-01

    The application of terrestrial laser scanners (TLSs) on construction sites for automating construction progress monitoring and controlling structural dimension compliance is growing markedly. However, current research in construction management relies on the planned building information model (BIM) to assign the accumulated point clouds to their corresponding structural elements, which may not be reliable in cases where the dimensions of the as-built structure differ from those of the planned model and/or the planned model is not available with sufficient detail. In addition outliers exist in construction site datasets due to data artefacts caused by moving objects, occlusions and dust. In order to overcome the aforementioned limitations, a novel method for robust classification and segmentation of planar and linear features is proposed to reduce the effects of outliers present in the LiDAR data collected from construction sites. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a robust clustering method. A method is also proposed to robustly extract the points belonging to the flat-slab floors and/or ceilings without performing the aforementioned stages in order to preserve computational efficiency. The applicability of the proposed method is investigated in two scenarios, namely, a laboratory with 30 million points and an actual construction site with over 150 million points. The results obtained by the two experiments validate the suitability of the proposed method for robust segmentation of planar and linear features in contaminated datasets, such as those collected from construction sites.

  1. 75 FR 57532 - In the Matter of: Stone & Webster Construction, Inc.; Confirmatory Order (Effective Immediately)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... to working in the nuclear industry for workers coming in without nuclear experience; New Hire... employees in its Nuclear Services (i.e., construction) and Nuclear Maintenance Divisions working at nuclear... (i.e., construction) and Nuclear Maintenance Divisions working at nuclear facilities addressing: (a...

  2. Individual Morphological Brain Network Construction Based on Multivariate Euclidean Distances Between Brain Regions.

    PubMed

    Yu, Kaixin; Wang, Xuetong; Li, Qiongling; Zhang, Xiaohui; Li, Xinwei; Li, Shuyu

    2018-01-01

    Morphological brain network plays a key role in investigating abnormalities in neurological diseases such as mild cognitive impairment (MCI) and Alzheimer's disease (AD). However, most of the morphological brain network construction methods only considered a single morphological feature. Each type of morphological feature has specific neurological and genetic underpinnings. A combination of morphological features has been proven to have better diagnostic performance compared with a single feature, which suggests that an individual morphological brain network based on multiple morphological features would be beneficial in disease diagnosis. Here, we proposed a novel method to construct individual morphological brain networks for two datasets by calculating the exponential function of multivariate Euclidean distance as the evaluation of similarity between two regions. The first dataset included 24 healthy subjects who were scanned twice within a 3-month period. The topological properties of these brain networks were analyzed and compared with previous studies that used different methods and modalities. Small world property was observed in all of the subjects, and the high reproducibility indicated the robustness of our method. The second dataset included 170 patients with MCI (86 stable MCI and 84 progressive MCI cases) and 169 normal controls (NC). The edge features extracted from the individual morphological brain networks were used to distinguish MCI from NC and separate MCI subgroups (progressive vs. stable) through the support vector machine in order to validate our method. The results showed that our method achieved an accuracy of 79.65% (MCI vs. NC) and 70.59% (stable MCI vs. progressive MCI) in a one-dimension situation. In a multiple-dimension situation, our method improved the classification performance with an accuracy of 80.53% (MCI vs. NC) and 77.06% (stable MCI vs. progressive MCI) compared with the method using a single feature. The results indicated that our method could effectively construct an individual morphological brain network based on multiple morphological features and could accurately discriminate MCI from NC and stable MCI from progressive MCI, and may provide a valuable tool for the investigation of individual morphological brain networks.

  3. Progress along the E-ELT instrumentation roadmap

    NASA Astrophysics Data System (ADS)

    Ramsay, Suzanne; Casali, Mark; Cirasuolo, Michele; Egner, Sebastian; Gray, Peter; Gonzáles Herrera, Juan Carlos; Hammersley, Peter; Haupt, Christoph; Ives, Derek; Jochum, Lieselotte; Kasper, Markus; Kerber, Florian; Lewis, Steffan; Mainieri, Vincenzo; Manescau, Antonio; Marchetti, Enrico; Oberti, Sylvain; Padovani, Paolo; Schmid, Christian; Schimpelsberger, Johannes; Siebenmorgen, Ralf; Szecsenyi, Orsolya; Tamai, Roberto; Vernet, Joël.

    2016-08-01

    A suite of seven instruments and associated AO systems have been planned as the "E-ELT Instrumentation Roadmap". Following the E-ELT project approval in December 2014, rapid progress has been made in organising and signing the agreements for construction with European universities and institutes. Three instruments (HARMONI, MICADO and METIS) and one MCAO module (MAORY) have now been approved for construction. In addition, Phase-A studies have begun for the next two instruments - a multi-object spectrograph and high-resolution spectrograph. Technology development is also ongoing in preparation for the final instrument in the roadmap, the planetary camera and spectrograph. We present a summary of the status and capabilities of this first set of instruments for the E-ELT.

  4. Progression in Ethical Reasoning When Addressing Socio-scientific Issues in Biotechnology

    NASA Astrophysics Data System (ADS)

    Berne, Birgitta

    2014-11-01

    This article reports on the outcomes of an intervention in a Swedish school in which the author, a teacher-researcher, sought to develop students' (14-15 years old) ethical reasoning in science through the use of peer discussions about socio-scientific issues. Prior to the student discussions various prompts were used to highlight different aspects of the issues. In addition, students were given time to search for further information themselves. Analysis of students' written arguments, from the beginning of the intervention and afterwards, suggests that many students seem to be moving away from their use of everyday language towards using scientific concepts in their arguments. In addition, they moved from considering cloning and 'designer babies' solely in terms of the present to considering them in terms of the future. Furthermore, the students started to approach the issues in additional ways using not only consequentialism but also the approaches of virtue ethics, and rights and duties. Students' progression in ethical reasoning could be related to the characteristics of the interactions in peer discussions as students who critically and constructively argued with each other's ideas, and challenged each other's claims, made progress in more aspects of ethical reasoning than students merely using cumulative talk. As such, the work provides valuable indications for the importance of introducing peer discussions and debates about SSIs in connection to biotechnology into the teaching of science in schools.

  5. [Risk factors associated with work-related accidents in the construction industry in the Valley of Mexico].

    PubMed

    Sarmiento-Salinas, Rodrigo; López-Rojas, Pablo; Marín-Cotoñieto, Irma Araceli; Godínez-Rocha, Arturo; Haro-García, Luis; Salinas-Tovar, Santiago

    2004-01-01

    Our aim was to describe construction-industry, work-related accident prevalence in, associated factors in, and potential impact on affiliated workers of the Mexican Institute of Social Security (Instituto Mexicano del Seguro Social, IMSS) in the Valley of Mexico. Prevalent cases in a retrospective case-control design. These include 385 construction-industry workers who were found to have construction work-related accidents in 2001. Controls comprised 385 active construction-industry workers without work-related accident background paired by gender, workplace, and worksite. Work-related accident prevalence in construction workers was 5.5%; most important risk factors and etiology fraction (Ef) included the following: age 16-20 years odds ratio, OR = 1.58, 95% confidence interval (95% CI) 1.40-10.7, p = 0.001, Ef 0.36; eventual insurance, OR = 3.7, 95% CI, 2.16-26.45, p = 0.001), Ef, 0.72, and no training for job, OR = 5.3, 95% CI, 4.9-69.2, p = 0.01), Ef: 0.81. Variables not showing significance were included salary, work shift, and workday. Work-related accident prevalence maintains its preponderance in the Valley of Mexico construction industry; identified risk factors are potentially modifiable, among which job training acquires unquestionable relevance.

  6. Theme and Thematic Progression in English Writing Teaching

    ERIC Educational Resources Information Center

    Jing, Wei

    2015-01-01

    Theme and thematic progression (T/TP) is a major aspect of the way that speakers construct their messages in a way which makes them fit smoothly into the unfolding language event. While studies have illustrated the usefulness of observing T/TP to identify English learners' writing difficulties and suggested that T/TP should be included in English…

  7. The Significance of Trust in the Political System and Motivation for Pupils' Learning Progress in Politics Lessons

    ERIC Educational Resources Information Center

    Landwehr, Barbara; Weisseno, Georg

    2016-01-01

    Very little research has been conducted on the contribution of political education to learning progress in Germany. Hence, there is a need for intervention studies measuring performance against the theoretical background of a political competence model. This model comprises three constructs: subject knowledge, motivation and attitudes. According…

  8. Optomechanics in a Levitated Droplet of Superfluid Helium

    NASA Astrophysics Data System (ADS)

    Brown, Charles; Harris, Glen; Harris, Jack

    2017-04-01

    A critical issue common to all optomechanical systems is dissipative coupling to the environment, which limits the system's quantum coherence. Superfluid helium's extremely low optical and mechanical dissipation, as well as its high thermal conductivity and its ability cool itself via evaporation, makes the mostly uncharted territory of superfluid optomechanics an exciting avenue for exploring quantum effects in macroscopic objects. I will describe ongoing work that aims to exploit the unique properties of superfluid helium by constructing an optomechanical system consisting of a magnetically levitated droplet of superfluid helium., The optical whispering gallery modes (WGMs) of the droplet, as well as the mechanical oscillations of its surface, should offer exceptionally low dissipation, and should couple to each other via the usual optomechanical interactions. I will present recent progress towards this goal, and also discuss the background for this work, which includes prior demonstrations of magnetic levitation of superfluid helium, high finesse WGMs in liquid drops, and the self-cooling of helium drops in vacuum.

  9. Making Work: Demonstrating Thermodynamic Concepts with Solar-Powered Wax and Rubber Heat Engines

    ERIC Educational Resources Information Center

    Appleyard, S. J.

    2007-01-01

    Construction details are provided for simple heat engines that use candle wax and elastomers as working substances. The engines are constructed using common household materials and can be easily constructed in a school classroom or at home. They work reliably and are useful tools for demonstrating the conversion of heat to mechanical work. They…

  10. 33 CFR 273.15 - Work Progress Report.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Work Progress Report. 273.15 Section 273.15 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL § 273.15 Work Progress Report. Reporting officers will prepare and submit to...

  11. 33 CFR 273.15 - Work Progress Report.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Work Progress Report. 273.15 Section 273.15 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL § 273.15 Work Progress Report. Reporting officers will prepare and submit to...

  12. 33 CFR 273.15 - Work Progress Report.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Work Progress Report. 273.15 Section 273.15 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL § 273.15 Work Progress Report. Reporting officers will prepare and submit to...

  13. 33 CFR 273.15 - Work Progress Report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Work Progress Report. 273.15 Section 273.15 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL § 273.15 Work Progress Report. Reporting officers will prepare and submit to...

  14. 33 CFR 273.15 - Work Progress Report.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Work Progress Report. 273.15 Section 273.15 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL § 273.15 Work Progress Report. Reporting officers will prepare and submit to...

  15. Molecular mapping of chromosomes 17 and X. Progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barker, D.F.

    1991-01-15

    Progress toward the construction of high density genetic maps of chromosomes 17 and X has been made by isolating and characterizing a relatively large set of polymorphic probes for each chromosome and using these probes to construct genetic maps. We have mapped the same polymorphic probes against a series of chromosome breakpoints on X and 17. The probes could be assigned to over 30 physical intervals on the X chromosome and 7 intervals on 17. In many cases, this process resulted in improved characterization of the relative locations of the breakpoints with respect to each other and the definition ofmore » new physical intervals. The strategy for isolation of the polymorphic clones utilized chromosome specific libraries of 1--15 kb segments from each of the two chromosomes. From these libraries, clones were screened for those detecting restriction fragment length polymorphisms. The markers were further characterized, the chromosomal assignments confirmed and in most cases segments of the original probes were subcloned into plasmids to produce probes with improved signal to noise ratios for use in the genetic marker studies. The linkage studies utilize the CEPH reference families and other well-characterized families in our collection which have been used for genetic disease linkage work. Preliminary maps and maps of portions of specific regions of 17 and X are provided. We have nearly completed a map of the 1 megabase Mycoplasma arthritidis genome by applying these techniques to a lambda phage library of its genome. We have found bit mapping to be an efficient means to organize a contiguous set of overlapping@ clones from a larger genome.« less

  16. 46 CFR 160.053-3 - Materials, construction and workmanship.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic... workmanship of unicellular plastic foam work vests specified by this subpart shall conform to the requirements.... All components used in the construction of work vests must meet the applicable requirements of subpart...

  17. 46 CFR 160.053-3 - Materials, construction and workmanship.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic... workmanship of unicellular plastic foam work vests specified by this subpart shall conform to the requirements.... All components used in the construction of work vests must meet the applicable requirements of subpart...

  18. 46 CFR 160.053-3 - Materials, construction and workmanship.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic... workmanship of unicellular plastic foam work vests specified by this subpart shall conform to the requirements.... All components used in the construction of work vests must meet the applicable requirements of subpart...

  19. Exploration of new perspectives and limitations in Agrobacterium mediated gene transfer technology. Progress report, [June 1, 1992-- May 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marton, L.

    1994-12-31

    This report describes progress aimed at constructing gene-transfer technology for Nicotiana plumbaginifolia. Most actual effort as described herein has so far been directed at exploring new perspectives and limitations in Agrobacterium mediated gene transfer. Accomplishments are described using a core homologous gene targeting vector.

  20. A look at construction aggregates production

    USGS Publications Warehouse

    Willett, Jason Christopher

    2009-01-01

    Construction aggregates are defined as the combination of crushed stone and construction sand and gravel. Aggregates are one of the most accessible natural resources on Earth and one of the fundamental building blocks of our society. They have been used from the earliest times of our civilization for a variety of applications that have increased in number and complexity with time and technological progress. Despite the relatively low but increasing unit value of its basic products, the construction aggregates industry is a major contributor to and an indicator of the economic well-being of the nation.

  1. 7 CFR Exhibit B-3 to Subpart I of... - Pre-Construction and Construction Phase Breakdown

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... interviews; obtain house plans; prepare cost estimates; begin search for land; submit family applications to... loan amounts requested; the lender reviews family loan dockets; preliminary title search of each... self-help grantees have several groups of families in various stages of progress during the period of...

  2. 7 CFR Exhibit B-3 to Subpart I of... - Pre-Construction and Construction Phase Breakdown

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... interviews; obtain house plans; prepare cost estimates; begin search for land; submit family applications to... loan amounts requested; the lender reviews family loan dockets; preliminary title search of each... self-help grantees have several groups of families in various stages of progress during the period of...

  3. 7 CFR Exhibit B-3 to Subpart I of... - Pre-Construction and Construction Phase Breakdown

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... interviews; obtain house plans; prepare cost estimates; begin search for land; submit family applications to... loan amounts requested; the lender reviews family loan dockets; preliminary title search of each... self-help grantees have several groups of families in various stages of progress during the period of...

  4. 7 CFR Exhibit B-3 to Subpart I of... - Pre-Construction and Construction Phase Breakdown

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... interviews; obtain house plans; prepare cost estimates; begin search for land; submit family applications to... loan amounts requested; the lender reviews family loan dockets; preliminary title search of each... self-help grantees have several groups of families in various stages of progress during the period of...

  5. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  6. 41 CFR 60-4.2 - Solicitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... trade on all construction work in the covered area, are as follows: Time- tables Goals for minority... goals for each year. These goals are applicable to all the Contractor's construction work (whether or... construction work in a geographical area located outside of the covered area, it shall apply the goals...

  7. The Progressive BSSG Rat Model of Parkinson's: Recapitulating Multiple Key Features of the Human Disease

    PubMed Central

    Van Kampen, Jackalina M.; Baranowski, David C.; Robertson, Harold A.; Shaw, Christopher A.; Kay, Denis G.

    2015-01-01

    The development of effective neuroprotective therapies for Parkinson's disease (PD) has been severely hindered by the notable lack of an appropriate animal model for preclinical screening. Indeed, most models currently available are either acute in nature or fail to recapitulate all characteristic features of the disease. Here, we present a novel progressive model of PD, with behavioural and cellular features that closely approximate those observed in patients. Chronic exposure to dietary phytosterol glucosides has been found to be neurotoxic. When fed to rats, β-sitosterol β-d-glucoside (BSSG) triggers the progressive development of parkinsonism, with clinical signs and histopathology beginning to appear following cessation of exposure to the neurotoxic insult and continuing to develop over several months. Here, we characterize the progressive nature of this model, its non-motor features, the anatomical spread of synucleinopathy, and response to levodopa administration. In Sprague Dawley rats, chronic BSSG feeding for 4 months triggered the progressive development of a parkinsonian phenotype and pathological events that evolved slowly over time, with neuronal loss beginning only after toxin exposure was terminated. At approximately 3 months following initiation of BSSG exposure, animals displayed the early emergence of an olfactory deficit, in the absence of significant dopaminergic nigral cell loss or locomotor deficits. Locomotor deficits developed gradually over time, initially appearing as locomotor asymmetry and developing into akinesia/bradykinesia, which was reversed by levodopa treatment. Late-stage cognitive impairment was observed in the form of spatial working memory deficits, as assessed by the radial arm maze. In addition to the progressive loss of TH+ cells in the substantia nigra, the appearance of proteinase K-resistant intracellular α-synuclein aggregates was also observed to develop progressively, appearing first in the olfactory bulb, then the striatum, the substantia nigra and, finally, hippocampal and cortical regions. The slowly progressive nature of this model, together with its construct, face and predictive validity, make it ideal for the screening of potential neuroprotective therapies for the treatment of PD. PMID:26439489

  8. Perspectives of construction robots

    NASA Astrophysics Data System (ADS)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  9. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  10. E-cadherin suppression accelerates squamous cell carcinoma progression in three-dimensional, human tissue constructs.

    PubMed

    Margulis, Alexander; Zhang, Weitian; Alt-Holland, Addy; Crawford, Howard C; Fusenig, Norbert E; Garlick, Jonathan A

    2005-03-01

    We studied the link between loss of E-cadherin-mediated adhesion and acquisition of malignant properties in three-dimensional, human tissue constructs that mimicked the initial stages of squamous cell cancer progression. Suppression of E-cadherin expression in early-stage, skin-derived tumor cells (HaCaT-II-4) was induced by cytoplasmic sequestration of beta-catenin upon stable expression of a dominant-negative E-cadherin fusion protein (H-2Kd-Ecad). In monolayer cultures, expression of H-2Kd-Ecad resulted in decreased levels of E-cadherin, redistribution of beta-catenin to the cytoplasm, and complete loss of intercellular adhesion when compared with control II-4 cells. This was accompanied by a 7-fold decrease in beta-catenin-mediated transcription and a 12-fold increase in cell migration. In three-dimensional constructs, E-cadherin-deficient tissues showed disruption of architecture, loss of adherens junctional proteins from cell contacts, and focal tumor cell invasion. Invasion was linked to activation of matrix metalloproteinase (MMP)-mediated degradation of basement membrane in H-2Kd-Ecad-expressing tissue constructs that was blocked by MMP inhibition (GM6001). Quantitative reverse transcription-PCR showed a 2.5-fold increase in MMP-2 and an 8-fold increase in MMP-9 in cells expressing the H-2Kd-Ecad fusion protein when compared with controls, and gel zymography showed increased MMP protein levels. Following surface transplantation of three-dimensional tissues, suppression of E-cadherin expression greatly accelerated tumorigenesis in vivo by inducing a switch to high-grade carcinomas that resulted in a 5-fold increase in tumor size after 4 weeks. Suppression of E-cadherin expression and loss of its function fundamentally modified squamous cell carcinoma progression by activating a highly invasive, aggressive tumor phenotype, whereas maintenance of E-cadherin prevented invasion in vitro and limited tumor progression in vivo.

  11. 26 CFR 1.954-7 - Increase in qualified investments in foreign base company shipping operations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Marine insurance claims receivables 1,000 Foreign income tax refunds receivable 1,000 Prepaid shipping expenses and shipping inventories ashore 1,000 Vessel construction funds 0 Vessels 123,000 Vessel plans and construction in progress 3,000 Containers and chassis 0 Terminal property and equipment 2,000 Shipping office...

  12. NEARING THE END OF CONSTRUCTION ON THE LOX TEST STAND AT MSFC.

    NASA Image and Video Library

    2015-01-08

    AS THE END OF CONSTRUCTION ON TEST STAND 4697, THE LIQUID OXYGEN TANK TEST STAND AT MARSHALL SPACE FLIGHT CENTER, PROJECT ENGINEERS PHIL HENDRIX, FROM MSFC, AND CURTNEY WALTERS FROM THE U.S. CORP OF ENGINEERS, STUDY PLANS AND PROGRESS.

  13. The Assessment of Recovery Capital: properties and psychometrics of a measure of addiction recovery strengths.

    PubMed

    Groshkova, Teodora; Best, David; White, William

    2013-03-01

    Sociological work on social capital and its impact on health behaviours have been translated into the addiction field in the form of 'recovery capital' as the construct for assessing individual progress on a recovery journey. Yet there has been little attempt to quantify recovery capital. The aim of the project was to create a scale that assessed addiction recovery capital. Initial focus group work identified and tested candidate items and domains followed by data collection from multiple sources to enable psychometric assessment of a scale measuring recovery capital. The scale shows moderate test-retest reliability at 1 week and acceptable concurrent validity. Principal component analysis determined single factor structure. The Assessment of Recovery Capital (ARC) is a brief and easy to administer measurement of recovery capital that has acceptable psychometric properties and may be a useful complement to deficit-based assessment and outcome monitoring instruments for substance dependent individuals in and out of treatment. © 2012 Australasian Professional Society on Alcohol and other Drugs.

  14. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    PubMed

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (p< 0.05) association between the intensity of pain feeling, age, year of working experience and risk level of the individual working postures of the labourers. Appropriate work-rest schedule, amendments of some working techniques and use of some ergonomically designed equipment may lessen the WRMSDs and improve the health eminence of construction labourers in unorganized sectors.

  15. 2 CFR 200.328 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... § 200.331 Requirements for pass-through entities. (b) Non-construction performance reports. The Federal... (including performance progress reports, Research Performance Progress Report, or such future collections as... performance reports at the interval required by the Federal awarding agency or pass-through entity to best...

  16. 2015 NWEA Measures of Academic Progress Normative Data

    ERIC Educational Resources Information Center

    Northwest Evaluation Association, 2015

    2015-01-01

    By using carefully constructed measurement scales that span grades, Measures of Academic Progress (MAP) interim assessments from Northwest Evaluation Association™ (NWEA™) offer educators efficient and very accurate estimates of student achievement status within a subject. Before achievement test scores can be useful to educators, however, they…

  17. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 22.402 Applicability. (a) Contracts for construction work. (1) The requirements of this subpart apply— (i) Only if the construction work is, or reasonably can be foreseen to be, performed at a particular site so that wage rates can be determined for the locality, and only to construction work that is...

  18. A Body of Work Standard-Setting Method with Construct Maps

    ERIC Educational Resources Information Center

    Wyse, Adam E.; Bunch, Michael B.; Deville, Craig; Viger, Steven G.

    2014-01-01

    This article describes a novel variation of the Body of Work method that uses construct maps to overcome problems of transparency, rater inconsistency, and scores gaps commonly occurring with the Body of Work method. The Body of Work method with construct maps was implemented to set cut-scores for two separate K-12 assessment programs in a large…

  19. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  20. Analysis of construction injury burden by type of work.

    PubMed

    Lowery, J T; Glazner, J; Borgerding, J A; Bondy, J; Lezotte, D C; Kreiss, K

    2000-04-01

    To lay groundwork for identifying patterns of injury etiology, we sought to describe injury experience associated with types of work performed at construction sites by examining workers' compensation (WC) claims for the 32,081 construction workers who built Denver International Airport (DIA). Injury rates and WC payment rates were calculated for 25 types of work based on claims and payroll data reported to DIA's owner-controlled insurance program according to National Council on Compensation Insurance job classifications. By linking DIA claims with corresponding lost-work-time (LWT) claims filed with Colorado's Workers' Compensation Division, we were also able to obtain and examine both total and median lost days for each type of work. Injury experience varied widely among the types of construction work. Workers building elevators and conduits and installing glass, metal, or steel were at particularly high risk of both LWT and non-LWT injury. Median days lost by injured workers was highest (202 days) for driving/trucking. Median days lost for most types of work was much greater than previously reported for construction: 40 days or more for 18 of the 25 types of work analyzed. WC payment rates reflect both number and severity of injuries and were generally not significantly different from expected losses. They were, however, significantly higher than expected for driving/trucking, metal/steel installation, inspection/analysis, and elevator construction. Analysis of injury data by type of work allows targeting of safety resources to high risk construction work and would be useful in prospective surveillance at large construction sites with centrally administered workers' compensation plans. Copyright 2000 Wiley-Liss, Inc.

  1. The Struggles of Women Industrial Workers To Improve Work Conditions in the Progressive Era.

    ERIC Educational Resources Information Center

    Barrett, Nancy J.

    1999-01-01

    Offers a lesson plan that addresses the working conditions endured by women in the Progressive Era and their struggles for womens rights in the workplace. Strives to demonstrate the similarities between the plights of the Progressive Era women to those of women workers in the 1990s. (CMK)

  2. ON THE CONSTRUCTION OF LATIN SQUARES COUNTERBALANCED FOR IMMEDIATE SEQUENTIAL EFFECTS.

    ERIC Educational Resources Information Center

    HOUSTON, TOM R., JR.

    THIS REPORT IS ONE OF A SERIES DESCRIBING NEW DEVELOPMENTS IN THE AREA OF RESEARCH METHODOLOGY. IT DEALS WITH LATIN SQUARES AS A CONTROL FOR PROGRESSIVE AND ADJACENCY EFFECTS IN EXPERIMENTAL DESIGNS. THE HISTORY OF LATIN SQUARES IS ALSO REVIEWED, AND SEVERAL ALGORITHMS FOR THE CONSTRUCTION OF LATIN AND GRECO-LATIN SQUARES ARE PROPOSED. THE REPORT…

  3. Anticipated Work-Family Conflict: A Construct Investigation

    ERIC Educational Resources Information Center

    Westring, Alyssa Friede; Ryan, Ann Marie

    2011-01-01

    To date, little is known about how work-family issues impact the career development process. In the current paper, we explore this issue by investigating a relatively unstudied construct: anticipated work-family conflict. We found that this construct can be represented by the same six-dimensional factor structure used to assess concurrent…

  4. Leading change to create a healthy and satisfying work environment.

    PubMed

    Sanders, Carolyn L; Krugman, Mary; Schloffman, Danielle H

    2013-01-01

    Nurse executives must take a leadership role in creating a healthy work environment for nurses and all disciplines. Engaging in partnerships and empowering clinical nurses to construct the solutions to barriers that may stand in the way of the goal of a satisfied and healthy workforce are important strategies toward success. This publication outlines many projects a 3-time Magnet-designated academic hospital has implemented, working with our shared leadership councils, to meet the standards for a healthy work environment. These initiatives, from the unit to the hospital level, included standardizing a culture change of uninterrupted meal breaks, the creation of intensive care unit Zen rooms, strategies to better manage increased patient volumes, best practices for facility design, enhancing physician-nurse relations, and a hospital wellness program. Data were benchmarked against national nurse and employee surveys to compare progress and report outcomes. Two important nursing organization structures that have contributed to the success of a healthy and satisfied nursing work environment include UEXCEL, a longstanding clinical nurse professional practice program, and the hospital's 11-year participation in the University HealthSystem Consortium/American Association of Colleges of Nursing National Post-Baccalaureate Nurse Residency Program. A highly engaged, well-educated, and committed nursing workforce, nurtured by a strong leadership team, has created a positive work environment characterized by low turnover and high retention.

  5. Inner work life: understanding the subtext of business performance.

    PubMed

    Amabile, Teresa M; Kramer, Steven J

    2007-05-01

    Anyone in management knows that employees have their good days and their bad days--and that, for the most part, the reasons for their ups and downs are unknown. Most managers simply shrug their shoulders at this fact of work life. But does it matter, in terms of performance, if people have more good days than bad days? Teresa Amabile and Steven Kramer's new stream of research, based on more than 12,000 diary entries logged by knowledge workers over three years, reveals the dramatic impact of employees' inner work lives--their perceptions, emotions, and motivation levels--on several dimensions of performance. People perform better when their workday experiences include more positive emotions, stronger intrinsic motivation (passion for the work), and more favorable perceptions of their work, their team, their leaders, and their organization. What the authors also found was that managers' behavior dramatically affects the tenor of employees' inner work lives. So what makes a difference to inner work life? When the authors compared the study participants' best days to their worst days, they found that the single most important differentiator was their sense of being able to make progress in their work. The authors also observed interpersonal events working in tandem with progress events. Praise without real work progress, or at least solid efforts toward progress, had little positive impact on people's inner work lives and could even arouse cynicism. On the other hand, good work progress without any recognition--or, worse, with criticism about trivial issues--could engender anger and sadness. Far and away, the best boosts to inner work life were episodes in which people knew they had done good work and their managers appropriately recognized that work.

  6. 3D Printing of Tissue Engineered Constructs for In Vitro Modeling of Disease Progression and Drug Screening.

    PubMed

    Vanderburgh, Joseph; Sterling, Julie A; Guelcher, Scott A

    2017-01-01

    2D cell culture and preclinical animal models have traditionally been implemented for investigating the underlying cellular mechanisms of human disease progression. However, the increasing significance of 3D vs. 2D cell culture has initiated a new era in cell culture research in which 3D in vitro models are emerging as a bridge between traditional 2D cell culture and in vivo animal models. Additive manufacturing (AM, also known as 3D printing), defined as the layer-by-layer fabrication of parts directed by digital information from a 3D computer-aided design file, offers the advantages of simultaneous rapid prototyping and biofunctionalization as well as the precise placement of cells and extracellular matrix with high resolution. In this review, we highlight recent advances in 3D printing of tissue engineered constructs that recapitulate the physical and cellular properties of the tissue microenvironment for investigating mechanisms of disease progression and for screening drugs.

  7. 3D Printing of Tissue Engineered Constructs for in vitro Modeling of Disease Progression and Drug Screening

    PubMed Central

    Vanderburgh, Joseph; Sterling, Julie A.

    2016-01-01

    2D cell culture and preclinical animal models have traditionally been implemented for investigating the underlying cellular mechanisms of human disease progression. However, the increasing significance of 3D versus 2D cell culture has initiated a new era in cell culture research in which 3D in vitro models are emerging as a bridge between traditional 2D cell culture and in vivo animal models. Additive manufacturing (AM, also known as 3D printing), defined as the layer-by-layer fabrication of parts directed by digital information from a 3D computer-aided design (CAD) file, offers the advantages of simultaneous rapid prototyping and biofunctionalization as well as the precise placement of cells and extracellular matrix with high resolution. In this review, we highlight recent advances in 3D printing of tissue engineered constructs (TECs) that recapitulate the physical and cellular properties of the tissue microenvironment for investigating mechanisms of disease progression and for screening drugs. PMID:27169894

  8. On the internal structure of relativistic jets collimated by ambient gas pressure

    NASA Astrophysics Data System (ADS)

    Beskin, V. S.; Chernoglazov, A. V.; Kiselev, A. M.; Nokhrina, E. E.

    2017-12-01

    Recent progress in very long baseline interferometry (VLBI) observations of relativistic jets outflowing from active galactic nuclei gives us direct information about jet width rjet(l) dependence on the distance l from the 'central engine'. Being the missing link in previous works, this relation opens the possibility of determining the internal structure of a jet. In this article, we consider a relativistic jet submerged in an external medium with finite gas pressure Pext. Neither an external magnetic field nor an infinitely thin current sheet will be assumed. This approach allows us to construct a reasonable solution in which both the magnetic field and the flow velocity vanish at the jet boundary r = rjet. In particular, the connection between external gas pressure and internal structure of a relativistic jet is determined.

  9. [Breath alcohol test in construction sites in the Province of Belluno: a campaign in favour of health promotion and surveillance and against drinking].

    PubMed

    Marcolina, Daniela; De Marzo, Nicoletta; Riccio, Maria Teresa

    2011-01-01

    Health impairment due to alcohol use and abuse is well known, in terms of relationship with traffic accidents and work accidents. In Italy almost 10 per cent of accidents at work involve intoxicated people injuring themselves and innocent victims. Alcohol abuse is a factor involved in determining severe accidents in the construction industry and epidemiological studies demonstrated a relationship between an elevated alcohol use and severity of accidents. Since in the Province of Belluno alcohol consumption may be elevated also at work, the two Occupational Health Units (SPISAL) in the province organized a campaign of information and surveillance against alcohol consumption at work in the construction industry. This report shows the campaign results, mainly in terms of breath alcohol tests performed in construction workers. After an extensive information campaign we inspected 50 sites, where 105 construction companies were at work, and tested 294 workers by breath alcohol test. No-one refused the test. Only 2.7% construction workers were positive for the breath alcohol test, and the levels were not elevated. This study shows that the construction workers in Belluno Province are responsible drinkers and are well aware of the policy of prohibition of alcohol consumption at work.

  10. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  11. 48 CFR 52.222-23 - Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...

  12. 48 CFR 52.222-23 - Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...

  13. 48 CFR 36.515 - Schedules for construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contemplated, the contract amount is expected to exceed the simplified acquisition threshold, and the period of... covering other management approaches for ensuring that a contractor makes adequate progress. [48 FR 42356... Schedules for construction contracts. The contracting officer may insert the clause at 52.236-15, Schedules...

  14. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  15. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  16. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  17. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  18. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  19. Study of the Open Loop and Closed Loop Oscillator Techniques

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Imel, George R.; Baker, Benjamin; Riley, Tony

    This report presents the progress and completion of a five-year study undertaken at Idaho State University of the measurement of very small worth reactivity samples comparing open and closed loop oscillator techniques.The study conclusively demonstrated the equivalency of the two techniques with regard to uncertainties in reactivity values, i.e., limited by reactor noise. As those results are thoroughly documented in recent publications, in this report we will concentrate on the support work that was necessary. For example, we describe in some detail the construction and calibration of a pilot rod for the closed loop system. We discuss the campaign tomore » measure the required reactor parameters necessary for inverse-kinetics. Finally, we briefly discuss the transfer of the open loop technique to other reactor systems.« less

  20. Cross-border gas-line projects face daunting challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khene, D.E.

    1997-12-15

    Pricing, costs, financing, and politics are chief among the issues that can impede construction of major, cross-border gas-pipeline projects trying to connect plentiful reserves with unsatisfied market demand. Additionally, strained relationships among parties involved in both supply and delivery can further slow or even halt progress on a project. In the cases of the Transmed (Algeria across Tunisia to Italy) and the Maghreb-Europe (Algeria across Morocco to Spain), the close working relationships of all parties involved helped resolve many issues and were key in the projects` eventual completion. Here is an update on these two important pipelines in addition tomore » a synthesis of Sonatrach`s views on some of the major issues raised by the development of cross-border gas-transmission projects.« less

  1. Religious construction of a first episode of psychosis in urban Brazil.

    PubMed

    Redko, Cristina

    2003-12-01

    Religion plays an important role in the lives of people with psychosis. Based on fieldwork with 21 families living in poor neighborhoods of São Paulo, Brazil, this article examines how youth suffering a first episode of psychosis resort to religion for help (including, Catholicism, Pentecostalism, Candomblé, and Umbanda) and how this frames their experience of psychosis and that of their family members. For young people, the personal articulation of religious idioms and signifiers served to communicate, elaborate and transform their experience of psychosis. Family members resorted to religion as a source of healing, complementary to psychiatric treatment, as well as for personal relief and comfort. For youth, involvement with religion worked in both 'progressive' and 'regressive' ways, to improve and, at times, to diminish functioning and well-being.

  2. Measuring Work Functioning: Validity of a Weighted Composite Work Functioning Approach.

    PubMed

    Boezeman, Edwin J; Sluiter, Judith K; Nieuwenhuijsen, Karen

    2015-09-01

    To examine the construct validity of a weighted composite work functioning measurement approach. Workers (health-impaired/healthy) (n = 117) completed a composite measure survey that recorded four central work functioning aspects with existing scales: capacity to work, quality of work performance, quantity of work, and recovery from work. Previous derived weights reflecting the relative importance of these aspects of work functioning were used to calculate the composite weighted work functioning score of the workers. Work role functioning, productivity, and quality of life were used for validation. Correlations were calculated and norms applied to examine convergent and divergent construct validity. A t test was conducted and a norm applied to examine discriminative construct validity. Overall the weighted composite work functioning measure demonstrated construct validity. As predicted, the weighted composite score correlated (p < .001) strongly (r > .60) with work role functioning and productivity (convergent construct validity), and moderately (.30 < r < .60) with physical quality of life and less strongly than work role functioning and productivity with mental quality of life (divergent validity). Further, the weighted composite measure detected that health-impaired workers show with a large effect size (Cohen's d > .80) significantly worse work functioning than healthy workers (discriminative validity). The weighted composite work functioning measurement approach takes into account the relative importance of the different work functioning aspects and demonstrated good convergent, fair divergent, and good discriminative construct validity.

  3. ELI-beamlines: progress in development of next generation short-pulse laser systems

    NASA Astrophysics Data System (ADS)

    Rus, B.; Bakule, P.; Kramer, D.; Naylon, J.; Thoma, J.; Fibrich, M.; Green, J. T.; Lagron, J. C.; Antipenkov, R.; Bartoníček, J.; Batysta, F.; Baše, R.; Boge, R.; Buck, S.; Cupal, J.; Drouin, M. A.; Durák, M.; Himmel, B.; Havlíček, T.; Homer, P.; Honsa, A.; Horáček, M.; Hríbek, P.; Hubáček, J.; Hubka, Z.; Kalinchenko, G.; Kasl, K.; Indra, L.; Korous, P.; Košelja, M.; Koubíková, L.; Laub, M.; Mazanec, T.; Meadows, A.; Novák, J.; Peceli, D.; Polan, J.; Snopek, D.; Šobr, V.; Trojek, P.; Tykalewicz, B.; Velpula, P.; Verhagen, E.; Vyhlídka, Å.; Weiss, J.; Haefner, C.; Bayramian, A.; Betts, S.; Erlandson, A.; Jarboe, J.; Johnson, G.; Horner, J.; Kim, D.; Koh, E.; Marshall, C.; Mason, D.; Sistrunk, E.; Smith, D.; Spinka, T.; Stanley, J.; Stolz, C.; Suratwala, T.; Telford, S.; Ditmire, T.; Gaul, E.; Donovan, M.; Frederickson, C.; Friedman, G.; Hammond, D.; Hidinger, D.; Chériaux, G.; Jochmann, A.; Kepler, M.; Malato, C.; Martinez, M.; Metzger, T.; Schultze, M.; Mason, P.; Ertel, K.; Lintern, A.; Edwards, C.; Hernandez-Gomez, C.; Collier, J.

    2017-05-01

    Overview of progress in construction and testing of the laser systems of ELI-Beamlines, accomplished since 2015, is presented. Good progress has been achieved in construction of all four lasers based largely on the technology of diode-pumped solid state lasers (DPSSL). The first part of the L1 laser, designed to provide 200 mJ <15 fs pulses at 1 kHz repetition rate, is up and running. The L2 is a development line employing a 10 J / 10 Hz cryogenic gas-cooled pump laser which has recently been equipped with an advanced cryogenic engine. Operation of the L3-HAPLS system, using a gas-cooled DPSSL pump laser and a Ti:sapphire broadband amplifier, was recently demonstrated at 16 J / 28 fs, at 3.33 Hz rep rate. Finally, the 5 Hz OPCPA front end of the L4 kJ laser is up running and amplification in the Nd:glass large-aperture power amplifiers was demonstrated.

  4. The Negro in the Farm Equipment and Construction Machinery Industries. The Racial Policies of American Industry.

    ERIC Educational Resources Information Center

    Ozanne, Robert; Klemp, Elsa

    This study covers two related industries in which Negro employment has historical roots, the farm machinery and construction machinery industries. As in several other studies in this series, emphasis is on the major companies in the industries. This emphasis may reflect a more favorable picture of black employment progress than the average, due to…

  5. Migration and Health in the Construction Industry: Culturally Centering Voices of Bangladeshi Workers in Singapore.

    PubMed

    Dutta, Mohan J

    2017-01-29

    Construction workers globally face disproportionate threats to health and wellbeing, constituted by the nature of the work they perform. The workplace fatalities and lost-time injuries experienced by construction workers are significantly greater than in other forms of work. This paper draws on the culture-centered approach (CCA) to dialogically articulate meanings of workplace risks and injuries, voiced by Bangladeshi migrant construction workers in Singapore. The narratives voiced by the participants suggest an ecological approach to workplace injuries in the construction industries, attending to food insecurity, lack of sleep, transportation, etc. as contextual features of work that shape the risks experienced at work. Moreover, participant voices point to the barriers in communication, lack of understanding, and experiences of incivility as features of work that constitute the ways in which they experience injury risks. The overarching discourses of productivity and efficiency constitute a broader climate of threats to worker safety and health.

  6. Defense Contracting: Key Data Not Routinely Used in Progress Payment Reviews

    DTIC Science & Technology

    1992-01-14

    the amount of pay- By .ments based on the fair value of undelivered work. Contractors may Distibtion ] submit requests for progress payments monthly and...exceed the Federal Acquisition Regulation limitations. These checks are based on contractor data and include the fair value and the loss ratio tests. The... fair value test is intended to ensure that progress payments for work in process do not exceed the value of that work. The loss ratio test is intended

  7. Improving Critical Thinking Using Web Based Argument Mapping Exercises with Automated Feedback

    ERIC Educational Resources Information Center

    Butchart, Sam; Forster, Daniella; Gold, Ian; Bigelow, John; Korb, Kevin; Oppy, Graham; Serrenti, Alexandra

    2009-01-01

    In this paper we describe a simple software system that allows students to practise their critical thinking skills by constructing argument maps of natural language arguments. As the students construct their maps of an argument, the system provides automatic, real time feedback on their progress. We outline the background and theoretical framework…

  8. Geologic Mapping of Impact Craters and the Mahuea Tholus Construct: A Year Three Progress Report for the Mahuea Tholus (V-49) Quadrangle, Venus

    NASA Astrophysics Data System (ADS)

    Lang, N. P.; Covley, M. T.; Beltran, J.; Rogers, K.; Thomson, B. J.

    2018-06-01

    We are reporting on our year three status of mapping the V-49 quadrangle (Mahuea Tholus). Our mapping efforts over this past year emphasized the 13 impact craters in the quadrangle as well as larger-scale mapping of the Mahuea Tholus construct.

  9. 33 CFR Appendix D to Part 273 - Work Progress Report

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Work Progress Report D Appendix D to Part 273 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. D Appendix D to Part 273—Work Progress Report Aquatic Plant...

  10. 33 CFR Appendix D to Part 273 - Work Progress Report

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Work Progress Report D Appendix D to Part 273 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. D Appendix D to Part 273—Work Progress Report Aquatic Plant...

  11. 33 CFR Appendix D to Part 273 - Work Progress Report

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Work Progress Report D Appendix D to Part 273 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. D Appendix D to Part 273—Work Progress Report Aquatic Plant...

  12. 33 CFR Appendix D to Part 273 - Work Progress Report

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Work Progress Report D Appendix D to Part 273 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. D Appendix D to Part 273—Work Progress Report Aquatic Plant...

  13. 33 CFR Appendix D to Part 273 - Work Progress Report

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Work Progress Report D Appendix D to Part 273 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE AQUATIC PLANT CONTROL Pt. 273, App. D Appendix D to Part 273—Work Progress Report Aquatic Plant...

  14. Active Work Zone Safety Using Emerging Technologies 2017.

    DOT National Transportation Integrated Search

    2017-07-01

    Highway construction work zones are hazardous environments characterized by a dynamic and limited work space. A host of interactions between workers, passing commuter vehicles, and moving construction equipment occurs in highway work zones fostering ...

  15. Why Open Drug Discovery Needs Four Simple Rules for Licensing Data and Models

    PubMed Central

    Williams, Antony J.; Wilbanks, John; Ekins, Sean

    2012-01-01

    When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves. PMID:23028298

  16. Exploring visuospatial abilities and their contribution to constructional abilities and nonverbal intelligence.

    PubMed

    Trojano, Luigi; Siciliano, Mattia; Cristinzio, Chiara; Grossi, Dario

    2018-01-01

    The present study aimed at exploring relationships among the visuospatial tasks included in the Battery for Visuospatial Abilities (BVA), and at assessing the relative contribution of different facets of visuospatial processing on tests tapping constructional abilities and nonverbal abstract reasoning. One hundred forty-four healthy subjects with a normal score on Mini Mental State Examination completed the BVA plus Raven's Coloured Progressive Matrices and Constructional Apraxia test. We used Principal Axis Factoring and Parallel Analysis to investigate relationships among the BVA visuospatial tasks, and performed regression analyses to assess the visuospatial contribution to constructional abilities and nonverbal abstract reasoning. Principal Axis Factoring and Parallel Analysis revealed two eigenvalues exceeding 1, accounting for about 60% of the variance. A 2-factor model provided the best fit. Factor 1 included sub-tests exploring "complex" visuospatial skills, whereas Factor 2 included two subtests tapping "simple" visuospatial skills. Regression analyses revealed that both Factor 1 and Factor 2 significantly affected performance on Raven's Coloured Progressive Matrices, whereas only the Factor 1 affected performance on Constructional Apraxia test. Our results supported functional segregation proposed by De Renzi, suggesting clinical caution to utilize a single test to assess visuospatial domain, and qualified the visuospatial contribution in drawing and non-verbal intelligence test.

  17. 3D Bioprinting for Tissue and Organ Fabrication

    PubMed Central

    Zhang, Yu Shrike; Yang, Jingzhou; Jia, Weitao; Dell’Erba, Valeria; Assawes, Pribpandao; Shin, Su Ryon; Dokmeci, Mehmet Remzi; Oklu, Rahmi; Khademhosseini, Ali

    2016-01-01

    The field of regenerative medicine has progressed tremendously over the past few decades in its ability to fabricate functional tissue substitutes. Conventional approaches based on scaffolding and microengineering are limited in their capacity of producing tissue constructs with precise biomimetic properties. Three-dimensional (3D) bioprinting technology, on the other hand, promises to bridge the divergence between artificially engineered tissue constructs and native tissues. In a sense, 3D bioprinting offers unprecedented versatility to co-deliver cells and biomaterials with precise control over their compositions, spatial distributions, and architectural accuracy, therefore achieving detailed or even personalized recapitulation of the fine shape, structure, and architecture of target tissues and organs. Here we briefly describe recent progresses of 3D bioprinting technology and associated bioinks suitable for the printing process. We then focus on the applications of this technology in fabrication of biomimetic constructs of several representative tissues and organs, including blood vessel, heart, liver, and cartilage. We finally conclude with future challenges in 3D bioprinting as well as potential solutions for further development. PMID:27126775

  18. 3D Bioprinting for Tissue and Organ Fabrication.

    PubMed

    Zhang, Yu Shrike; Yue, Kan; Aleman, Julio; Moghaddam, Kamyar Mollazadeh; Bakht, Syeda Mahwish; Yang, Jingzhou; Jia, Weitao; Dell'Erba, Valeria; Assawes, Pribpandao; Shin, Su Ryon; Dokmeci, Mehmet Remzi; Oklu, Rahmi; Khademhosseini, Ali

    2017-01-01

    The field of regenerative medicine has progressed tremendously over the past few decades in its ability to fabricate functional tissue substitutes. Conventional approaches based on scaffolding and microengineering are limited in their capacity of producing tissue constructs with precise biomimetic properties. Three-dimensional (3D) bioprinting technology, on the other hand, promises to bridge the divergence between artificially engineered tissue constructs and native tissues. In a sense, 3D bioprinting offers unprecedented versatility to co-deliver cells and biomaterials with precise control over their compositions, spatial distributions, and architectural accuracy, therefore achieving detailed or even personalized recapitulation of the fine shape, structure, and architecture of target tissues and organs. Here we briefly describe recent progresses of 3D bioprinting technology and associated bioinks suitable for the printing process. We then focus on the applications of this technology in fabrication of biomimetic constructs of several representative tissues and organs, including blood vessel, heart, liver, and cartilage. We finally conclude with future challenges in 3D bioprinting as well as potential solutions for further development.

  19. Studies on Labour Safety in Construction Sites

    PubMed Central

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  20. Studies on Labour Safety in Construction Sites.

    PubMed

    Kanchana, S; Sivaprakash, P; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  1. Association between perceived present working conditions and demands versus attitude to early retirement among construction workers.

    PubMed

    Jebens, Einar; Medbø, Jon I; Knutsen, Oddvar; Mamen, Asgeir; Veiersted, Kaj Bo

    2014-01-01

    Early retirement is an increasing problem in the construction industry. There is limited information about causes leading employees to leave working life early. We have compared construction workers present situation with their perception of future demands at work to avoid early retirement. All 87 employees in a medium-sized Norwegian construction company participated in the study. All were men and answered questionnaires on health and pain, work ability, mechanical exposure, psychosocial conditions, and demands regarding future working conditions. Most workers showed good work ability, irrespective of age. Many reported high levels of mechanical exposure at work. The level of musculoskeletal pain was higher in the middle-aged (30-50 year old) age groups and seniors aged over 50 years than among the youngest workers less than 30 years of age. All workers reported that good health was important for continued working. Most workers stated that future work must not be too physically demanding. Many workers reported relatively low job satisfaction; consequently an interesting job was rated as important for continuing work. Good social conditions were a high priority. According to the examined construction workers, good health and reduced levels of mechanical exposure at work are essential to avoid early retirement.

  2. [The current state and prospect of Chinese medicine gastroenterology].

    PubMed

    Zhang, Sheng-Sheng; Zhou, Tao

    2012-03-01

    The progress and existent problems of Chinese medicine (CM) gastroenterology since the National Eleventh Five-Year Plan were discussed in this article in terms of theory innovation, formulation of clinical pathway and diagnosis-treatment consensus, efficacy assessment, formulation of efficacy assessment scale, advantage diseases, and exploration of the syndrome standardization, progress in science research, academic exchange, and the construction of study platform, and so on. Meanwhile, the development of CM gastroenterology was prospected in the following five aspects: to enhance the theory inheritance and innovation, the construction of discipline standardization; to establish scientific clinical efficacy assessment methods and the standard system; to expend treatment technologies and feature therapies; and to clarify the modern scientific connotation of CM theory and treatment.

  3. Prediction of thermal cycling induced cracking in polmer matrix composites

    NASA Technical Reports Server (NTRS)

    Mcmanus, Hugh L.

    1994-01-01

    The work done in the period August 1993 through February 1994 on the 'Prediction of Thermal Cycling Induced Cracking In Polymer Matrix Composites' program is summarized. Most of the work performed in this period, as well as the previous one, is described in detail in the attached Master's thesis, 'Analysis of Thermally Induced Damage in Composite Space Structures,' by Cecelia Hyun Seon Park. Work on a small thermal cycling and aging chamber was concluded in this period. The chamber was extensively tested and calibrated. Temperatures can be controlled very precisely, and are very uniform in the test chamber. Based on results obtained in the previous period of this program, further experimental progressive cracking studies were carried out. The laminates tested were selected to clarify the differences between the behaviors of thick and thin ply layers, and to explore other variables such as stacking sequence and scaling effects. Most specimens tested were made available from existing stock at Langley Research Center. One laminate type had to be constructed from available prepreg material at Langley Research Center. Specimens from this laminate were cut and prepared at MIT. Thermal conditioning was carried out at Langley Research Center, and at the newly constructed MIT facility. Specimens were examined by edge inspection and by crack configuration studies, in which specimens were sanded down in order to examine the distribution of cracks within the specimens. A method for predicting matrix cracking due to decreasing temperatures and/or thermal cycling in all plies of an arbitrary laminate was implemented as a computer code. The code also predicts changes in properties due to the cracking. Extensive correlations between test results and code predictions were carried out. The computer code was documented and is ready for distribution.

  4. The Remediation of Abandoned Iron Ore Mine Subsidence in Rockaway Township, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gartenberg, Gary; Poff, Gregory

    2010-06-30

    This report represents the twenty-seventh and Final Technical Progress Report issued in connection with the subsidence remediation projects undertaken by Rockaway Township in Morris County, New Jersey. This report provides a summary of the major project work accomplished during this last reporting period ending June 30, 2010 and a summary of the work accomplished since the agreement inception in 1997. This report is issued as part of the project reporting provisions set forth in the Cooperator's Agreement between the United States Government - Department of Energy, and Rockaway Township. The purpose of the Cooperator's Agreement is for the Department ofmore » Energy to provide technical and financial assistance in a coordinated effort with Rockaway Township to develop and implement a multi-phased plan to remediate ground stability problems associated with abandoned mining activity. Primarily during the 1800's, extensive iron ore mining and prospecting was undertaken in Rockaway Township, part of the Dover District Mining region in Morris County. The abandoned mining activity has resulted in public safety hazards associated with ground collapse and surface subsidence features evolving in both developed and undeveloped areas within Rockaway Township. At the Green Pond Mine site at the Township's Jacobs Road Compost Storage Facility, surface monitoring continued after completion of construction in September 2003. Surface monitoring was conducted periodically at the Mt. Hope Road subsidence work area and adjacent areas after the January 2000 construction effort. In March 2007, a seventh collapse occurred over a portion of the White Meadow Mine in a public roadway at the intersection of Iowa and Erie Avenues in Rockaway Township. After test drilling, this portion of the mine was remediated by drilling and grouting the stopes.« less

  5. Biomechanics of far cortical locking.

    PubMed

    Bottlang, Michael; Feist, Florian

    2011-02-01

    The development of far cortical locking (FCL) was motivated by a conundrum: locked plating constructs provide inherently rigid stabilization, yet they should facilitate biologic fixation and secondary bone healing that relies on flexible fixation to stimulate callus formation. Recent studies have confirmed that the high stiffness of standard locked plating constructs can suppress interfragmentary motion to a level that is insufficient to reliably promote secondary fracture healing by callus formation. Furthermore, rigid locking screws cause an uneven stress distribution that may lead to stress fracture at the end screw and stress shielding under the plate. This review summarizes four key features of FCL constructs that have been shown to enhance fixation and healing of fractures: flexible fixation, load distribution, progressive stiffening, and parallel interfragmentary motion. Specifically, flexible fixation provided by FCL reduces the stiffness of a locked plating construct by 80% to 88% to actively promote callus proliferation similar to an external fixator. Load is evenly distributed between FCL screws to mitigate stress risers at the end screw. Progressive stiffening occurs by near cortex support of FCL screws and provides additional support under elevated loading. Finally, parallel interfragmentary motion by the S-shaped flexion of FCL screws promotes symmetric callus formation. In combination, these features of FCL constructs have been shown to induce more callus and to yield significantly stronger and more consistent healing compared with standard locked plating constructs. As such, FCL constructs function as true internal fixators by replicating the biomechanical behavior and biologic healing response of external fixators.

  6. Biomechanics of Far Cortical Locking

    PubMed Central

    Bottlang, Michael; Feist, Florian

    2011-01-01

    The development of FCL was motivated by a conundrum: locked plating constructs provide inherently rigid stabilization, yet they should facilitate biological fixation and secondary bone healing that relies on flexible fixation to stimulate callus formation. Recent studies have confirmed that the high stiffness of standard locked plating constructs can suppress interfragmentary motion to a level that is insufficient to reliably promote secondary fracture healing by callus formation. Furthermore, rigid locking screws cause an uneven stress distribution that may lead to stress fracture at the end screw and stress shielding under the plate. This review summarizes four key features of FCL constructs that have shown to enhance fixation and fracture healing: Flexible fixation, load distribution, progressive stiffening, and parallel interfragmentary motion. Specifically, flexible fixation provided by FCL reduces the stiffness of a locked plating construct by 80–88% to actively promote callus proliferation similar to an external fixator. Load distribution is evenly shared between FCL screws to mitigate stress risers at the end screw. Progressive stiffening occurs by near cortex support of FCL screws and provides additional support under elevated loading. Finally, parallel interfragmentary motion by s-shaped flexion of FCL screws has shown to induce symmetric callus formation. In combination, these features of FCL constructs have shown to induce more callus and to yield significantly stronger and more consistent healing compared to standard locked plating constructs. As such, FCL constructs function as true internal fixators by replicating the biomechanical behavior and biological healing response of external fixators. PMID:21248556

  7. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    PubMed

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  8. Occupational Safety Issues in Residential Construction Surveyed in Wisconsin, United States

    PubMed Central

    CHOI, Sang D.; CARLSON, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry. PMID:25016947

  9. An Interdisciplinary Conservation Module for Condition Survey on Cultural Heritages with a 3d Information System

    NASA Astrophysics Data System (ADS)

    Pedelì, C.

    2013-07-01

    In order to make the most of the digital outsourced documents, based on new technologies (e.g.: 3D LASER scanners, photogrammetry, etc.), a new approach was followed and a new ad hoc information system was implemented. The obtained product allow to the final user to reuse and manage the digital documents providing graphic tools and an integrated specific database to manage the entire documentation and conservation process, starting from the condition assessment until the conservation / restoration work. The system is organised on two main modules: Archaeology and Conservation. This paper focus on the features and the advantages of the second one. In particular it is emphasized its logical organisation, the possibility to easily mapping by using a very precise 3D metric platform, to benefit of the integrated relational database which allows to well organise, compare, keep and manage different kind of information at different level. Conservation module can manage along the time the conservation process of a site, monuments, object or excavation and conservation work in progress. An alternative approach called OVO by the author of this paper, force the surveyor to observe and describe the entity decomposing it on functional components, materials and construction techniques. Some integrated tools as the "ICOMOS-ISCS Illustrated glossary … " help the user to describe pathologies with a unified approach and terminology. Also the conservation project phase is strongly supported to envision future intervention and cost. A final section is devoted to record the conservation/restoration work already done or in progress. All information areas of the conservation module are interconnected to each other to allows to the system a complete interchange of graphic and alphanumeric data. The conservation module it self is connected to the archaeological one to create an interdisciplinary daily tool.

  10. Nuclear Technology Division annual progress report for period ending June 30, 1972

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1972-10-01

    This document is a report of progress on technical programs of the Nuclear Technology,Division of Aerojet Nuclear Company for FY 72 ending June 30, 1972. It contains abstracts or expansions of abstracts of papers which have been published within the year. In these cases, preprints or reprints of the articles available. Results of work in progress are also reported; since this work is of a preliminary nature, the authors should be contacted before including any reference to these works in other publications.

  11. Men's work, Women's work, and mental health: A longitudinal investigation of the relationship between the gender composition of occupations and mental health.

    PubMed

    Milner, Allison; King, Tania; LaMontagne, Anthony D; Bentley, Rebecca; Kavanagh, Anne

    2018-05-01

    This longitudinal investigation assesses the extent to which the gender composition of an occupation (e.g., the extent to which an occupation is comprised of males versus females) has an impact on mental health. We used 14 annual waves of the Household Income Labour Dynamics in Australia (HILDA) study to construct a measure representing the gender ratio of an occupation. The outcome measure was the Mental Health Inventory (MHI-5). A Mundlak model was used to compare within and between person effects, after controlling for possible confounders. Results suggest that males and females employed in occupations where their own gender was dominant had better mental health than those in gender-neutral occupations (between person effects). However, within-person results suggested that a movement from a gender-neutral to a male or female dominated occupation was associated with both a decline (females) and improvement (males) in mental health. These results highlight the need for more research on gender specific selection into and out of different occupations in order to progress understandings of gender as a social determinant of health in the work context. Copyright © 2018 Elsevier Ltd. All rights reserved.

  12. Laforin prevents stress-induced polyglucosan body formation and Lafora disease progression in neurons.

    PubMed

    Wang, Yin; Ma, Keli; Wang, Peixiang; Baba, Otto; Zhang, Helen; Parent, Jack M; Zheng, Pan; Liu, Yang; Minassian, Berge A; Liu, Yan

    2013-08-01

    Glycogen, the largest cytosolic macromolecule, is soluble because of intricate construction generating perfect hydrophilic-surfaced spheres. Little is known about neuronal glycogen function and metabolism, though progress is accruing through the neurodegenerative epilepsy Lafora disease (LD) proteins laforin and malin. Neurons in LD exhibit Lafora bodies (LBs), large accumulations of malconstructed insoluble glycogen (polyglucosans). We demonstrated that the laforin-malin complex reduces LBs and protects neuronal cells against endoplasmic reticulum stress-induced apoptosis. We now show that stress induces polyglucosan formation in normal neurons in culture and in the brain. This is mediated by increased glucose-6-phosphate allosterically hyperactivating muscle glycogen synthase (GS1) and is followed by activation of the glycogen digesting enzyme glycogen phosphorylase. In the absence of laforin, stress-induced polyglucosans are undigested and accumulate into massive LBs, and in laforin-deficient mice, stress drastically accelerates LB accumulation and LD. The mechanism through which laforin-malin mediates polyglucosan degradation remains unclear but involves GS1 dephosphorylation by laforin. Our work uncovers the presence of rapid polyglucosan metabolism as part of the normal physiology of neuroprotection. We propose that deficiency in the degradative phase of this metabolism, leading to LB accumulation and resultant seizure predisposition and neurodegeneration, underlies LD.

  13. 25 CFR 900.132 - Once a contract and/or grant is awarded, how will the Indian tribe or tribal organization receive...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... schedule for advance payments shall be developed based on progress, need, and other considerations in... project based on progress and need. (b) Payments shall be made to the Indian tribe or tribal organization... amounts measured by time or measured by phase of the project (e.g., planning, design, construction). (d...

  14. LLNL electro-optical mine detection program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, C.; Aimonetti, W.; Barth, M.

    1994-09-30

    Under funding from the Advanced Research Projects Agency (ARPA) and the US Marine Corps (USMC), Lawrence Livermore National Laboratory (LLNL) has directed a program aimed at improving detection capabilities against buried mines and munitions. The program has provided a national test facility for buried mines in arid environments, compiled and distributed an extensive data base of infrared (IR), ground penetrating radar (GPR), and other measurements made at that site, served as a host for other organizations wishing to make measurements, made considerable progress in the use of ground penetrating radar for mine detection, and worked on the difficult problem ofmore » sensor fusion as applied to buried mine detection. While the majority of our effort has been concentrated on the buried mine problem, LLNL has worked with the U.S.M.C. on surface mine problems as well, providing data and analysis to support the COBRA (Coastal Battlefield Reconnaissance and Analysis) program. The original aim of the experimental aspect of the program was the utilization of multiband infrared approaches for the detection of buried mines. Later the work was extended to a multisensor investigation, including sensors other than infrared imagers. After an early series of measurements, it was determined that further progress would require a larger test facility in a natural environment, so the Buried Object Test Facility (BOTF) was constructed at the Nevada Test Site. After extensive testing, with sensors spanning the electromagnetic spectrum from the near ultraviolet to radio frequencies, possible paths for improvement were: improved spatial resolution providing better ground texture discrimination; analysis which involves more complicated spatial queueing and filtering; additional IR bands using imaging spectroscopy; the use of additional sensors other than IR and the use of data fusion techniques with multi-sensor data; and utilizing time dependent observables like temperature.« less

  15. Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodruff, Dana L.; Judd, Chaeli; Thom, Ronald M.

    2010-01-01

    This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, includingmore » harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).« less

  16. Exploring Applications of Covalent Organic Frameworks: Homogeneous Reticulation of Radicals for Dynamic Nuclear Polarization.

    PubMed

    Cao, Wei; Wang, Wei David; Xu, Hai-Sen; Sergeyev, Ivan V; Struppe, Jochem; Wang, Xiaoling; Mentink-Vigier, Frederic; Gan, Zhehong; Xiao, Ming-Xing; Wang, Lu-Yao; Chen, Guo-Peng; Ding, San-Yuan; Bai, Shi; Wang, Wei

    2018-06-06

    Rapid progress has been witnessed in the past decade in the fields of covalent organic frameworks (COFs) and dynamic nuclear polarization (DNP). In this contribution, we bridge these two fields by constructing radical-embedded COFs as promising DNP agents. Via polarization transfer from unpaired electrons to nuclei, DNP realizes significant enhancement of NMR signal intensities. One of the crucial issues in DNP is to screen for suitable radicals to act as efficient polarizing agents, the basic criteria for which are homogeneous distribution and fixed orientation of unpaired electrons. We therefore envisioned that the crystalline and porous structures of COFs, if evenly embedded with radicals, may work as a new "crystalline sponge" for DNP experiments. As a proof of concept, we constructed a series of proxyl-radical-embedded COFs (denoted as PR( x)-COFs) and successfully applied them to achieve substantial DNP enhancement. Benefiting from the bottom-up and multivariate synthetic strategies, proxyl radicals have been covalently reticulated, homogeneously distributed, and rigidly embedded into the crystalline and mesoporous frameworks with adjustable concentration ( x%). Excellent performance of PR( x)-COFs has been observed for DNP 1 H, 13 C, and 15 N solid-state NMR enhancements. This contribution not only realizes the direct construction of radical COFs from radical monomers, but also explores the new application of COFs as DNP polarizing agents. Given that many radical COFs can therefore be rationally designed and facilely constructed with well-defined composition, distribution, and pore size, we expect that our effort will pave the way for utilizing radical COFs as standard polarizing agents in DNP NMR experiments.

  17. The Attitude of Construction Workers toward the Implementation of Occupational Health and Safety (OHS)

    NASA Astrophysics Data System (ADS)

    Widaningsih, L.; Susanti, I.; Chandra, T.

    2018-02-01

    Construction industry refers to one of the industries dealing with high accident rate. Besides its outdoor workplace involving many workers who usually work manually, the workers’ work culture and less awareness of occupational health and safety (OHS) are attributed to the high accident rate. This study explores some construction workers who are involved in some construction projects in big cities such as Bandung and Jakarta. The questionnaire-given to the construction workers focusing on stone construction, wood construction, and finishing session-reveals that the construction workers knowledge and understanding of nine Occupational Health and Safety (OHS) aspects reach above 50%. However, does not appear to reflect their knowledge and understanding of Occupational Health and Safety (OHS). The results of Focus Group Discussion (FGD) and an in-depth interview show that the fallacious implementation of Occupational Health and Safety (OHS) is attributed to their traditional “work culture”.

  18. Quantum Manybody Physics with Rydberg Polaritons

    DTIC Science & Technology

    2016-06-22

    report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...for public release. Over the course of this grant, we have seen tremendous progress, both theoretically and experimentally , in our control of photonic...shown in multiple stages of construction at left and below, spans three optical tables in two rooms: One for the experimental control system

  19. 7 CFR Exhibit F to Subpart A of... - Payment Bond

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt... _______ day of ________19__, a copy of which is hereto attached and made a part hereof for the construction of... connection with the construction of such WORK, and for all labor cost incurred in such WORK including that by...

  20. Epidemiology of work-related injuries among construction workers of ilam (Western iran) during 2006 - 2009.

    PubMed

    Moradinazar, Mehdi; Kurd, Nematullah; Farhadi, Rozita; Amee, Vahid; Najafi, Farid

    2013-10-01

    Work-related injuries are the most important cause of work absence, disability, retirement, mutilation, and even mortality. In Iran a great number of work-related injuries are occurred in construction industry. However, less than 12% of total workers are active in the construction sector. This study aimed to determine the incidence rate of work-related injuries, the type of injuries, and its other determinants among the construction workers of Ilam (Iran). The participants were the workers and staffs working in the construction activities of Ilam in Western Iran. All the recorded injuries and deaths related to the construction workers of Ilam from 2006-2009 were collected from the Bureau of Labor and Social Affairs and then analyzed by the statistical package of SPSS (version 19, for Windows). During 2006 - 2009 in Ilam, 387workers encountered the building accidents. Their mean age was 34.3 years (SD = 12.4). The average annual incidence of work-related injuries among the workers was 8.2 per 1000 workers. Fracture with 275 cases (71%) was the most common outcome of injuries, and slipping and falling with 77 cases (36%) were the most important events and exposures. The most important factor related to injuries was the lack of surveillance by employers which was also related with the severity of accident-induced injuries (P < 0.004). Considering the effectiveness of the relevant preventive measures activities such as training the workers as well as using safety tools and more surveillance by employers can decrease the number of work-related injuries among constructive workers.

Top