Contingency Operations Support to NASA Johnson Space Center Medical Operations Division
NASA Technical Reports Server (NTRS)
Stepaniak, Philip; Patlach, Bob; Swann, Mark; Adams, Adrien
2005-01-01
The Wyle Laboratories Contingency Operations Group provides support to the NASA Johnson Space Center (JSC) Medical Operations Division in the event of a space flight vehicle accident or JSC mishap. Support includes development of Emergency Medical System (EMS) requirements, procedures, training briefings and real-time support of mishap investigations. The Contingency Operations Group is compliant with NASA documentation that provides guidance in these areas and maintains contact with the United States Department of Defense (DOD) to remain current on military plans to support NASA. The contingency group also participates in Space Operations Medical Support Training Courses (SOMSTC) and represents the NASA JSC Medical Operations Division at contingency exercises conducted worldwide by the DOD or NASA. The events of September 11, 2001 have changed how this country prepares and protects itself from possible terrorist attacks on high-profile targets. As a result, JSC is now considered a high-profile target and thus, must prepare for and develop a response to a Weapons of Mass Destruction (WMD) incident. The Wyle Laboratories Contingency Operations Group supports this plan, specifically the medical response, by providing expertise and manpower.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less
Organizing NORTHCOM for Success: A Theater Special Operations Command
2003-05-22
90 U.S. FORSCOM, "Olympic and Paralympic Games Operations Plan for Emergency Contingency Support," (Ft. McPherson: U.S...Army Forces Command. "Olympic and Paralympic Games Operations Plan for Emergency Contingency Support." Ft. McPherson: Georgia, 1996. ———. "HQ FORSCOM and...Atlanta Organizing Committee for the Olympic Games for the purpose of planning for security and logistical support that the Department of Defense may
76 FR 22648 - Resolution Plans and Credit Exposure Reports Required
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
..., including associated services, functions and support that, in the view of the Covered Company or as jointly...-based Covered Company's overall contingency planning process, and information regarding the.... operations be linked to the contingency planning process of the foreign-based Covered Company? Process 1. Are...
Implications of Contingency Planning Support for Weather and Icing Information
NASA Technical Reports Server (NTRS)
Vigeant-Langlois, Laurence; Hansman, R. John, Jr.
2003-01-01
A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.
40 CFR 35.6010 - Indian Tribe and intertribal consortium eligibility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Hazardous Substances Pollution Contingency Plan (the National Contingency Plan or NCP), except that Indian... jurisdiction is not needed for the Tribe to carry out the support agency activities of the work plan. (b... substantially the same as a State, the subpart O definition of “State” does not include Indian Tribes because...
Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana
2018-01-01
Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.
2012-12-01
Makeup for the CASO (After Deputy Assistant Secretary of Defense for Manufacturing and Industrial Base, n.d., p. 7) .......73 xiv Figure 26. JCASO...Augmentation Program CAP Crisis Action Planning CASO Contingency Acquisition Support Office CBP Capability-Based Planning CCAS Contingency...enhance joint doctrine; 69 Develop and refine joint non-acquisition OCS training and education and ensure its inclusion in joint exercises; Identify
Fernández, Marcela T; Gómez, Adrián R; Santojanni, Américo M; Cancio, Alfredo H; Luna, Daniel R; Benítez, Sonia E
2015-01-01
Electronic Health Record system downtimes may have a great impact on patient care continuity. This paper describes the analysis and actions taken to redesign the Contingency Plan Procedure for the Electronic Health Record System of Hospital Italiano de Buenos Aires. After conducting a thorough analysis of the data gathered at post-contingency meetings, weaknesses were identified in the procedure; thus, strategic actions were recommended to redesign the Contingency Plan to secure an effective communications channel, as well as a formal structure for functions that may support the decision-making process. The main actions were: 1) to incorporate the IT Contingencies Committee (Plan management); 2) to incorporate the Coordinator (general supervision of the procedure); and 3) to redefine the role of the Clinical Informatics Resident, who will be responsible for managing communication between the technical team and Electronic Health Record users. As users need the information for continuity of care, key users evaluated the impact of the new strategy with an adapted survey.
Achieving Unity of Effort: A Challenge in Domestic Support Operations.
1998-03-09
active duty soldiers and 13,376 National Guard soldiers from 47 states and territories in support of the Olympic and Paralympic Games . There was no...Olympic and Paralympic Games Contingency Operations," presented at the DOD Emergency Preparedness Course 97-01,1 Nov 97. Hereafter cited as Steinmetz...Preparedness Course. 63 Shalikashvili, 1-3. 64 FORSCOM 1996 Olympic and Paralympic Games Operations Plan for Emergency Contingency Support, Ft
Disaster Preparedness Planning and Facility Contingency Operations for Public Works
1993-01-01
Forces Reporting Disaster Preparedness and Logistical Support 20-37 General Concept Manpower Planning, Protection and Support Personal Protection...their military mission, economical importance, geographical location, and personal and public safety. The organization, preparedness plans and facility...for emergency medical support). (5) Issue personal protective gear and equipment, if necessary. (6) Determine existi- g contract outcome. All
40 CFR 264.53 - Copies of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...
2013-01-07
Contingency Operations Task Force, 2011, p. 4)...........................68 Figure 25. Original Organizational Makeup for the CASO (After Deputy...Workforce CAP Civilian Augmentation Program CAP Crisis Action Planning CASO Contingency Acquisition Support Office CBP Capability-Based...its inclusion in joint exercises; Identify and assign responsibilities to institutionalize OCS lesson development, analysis, documentation and use
40 CFR 264.54 - Amendment of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Amendment of contingency plan. 264.54... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) The facility permit is revised; (b) The plan...
40 CFR 264.54 - Amendment of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Amendment of contingency plan. 264.54... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) The facility permit is revised; (b) The plan...
30 CFR 282.26 - Contingency Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...
40 CFR 264.53 - Copies of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b) Submitted to all local...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 264.53 - Copies of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b) Submitted to all local...
40 CFR 264.53 - Copies of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b) Submitted to all local...
40 CFR 264.53 - Copies of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b) Submitted to all local...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.53 - Copies of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...
40 CFR 265.54 - Amendment of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...
40 CFR 265.54 - Amendment of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...
40 CFR 264.54 - Amendment of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...
40 CFR 265.54 - Amendment of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 267.54 - When must I amend the contingency plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 267.54 - When must I amend the contingency plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...
40 CFR 267.54 - When must I amend the contingency plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...
40 CFR 265.52 - Content of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 265.52... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 265.51 and 265.56 in...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
40 CFR 267.52 - What must be in the contingency plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What must be in the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.52 What must be in the contingency plan? (a) Your contingency plan must: (1) Describe the actions facility personnel will take to comply with §§ 267...
40 CFR 267.52 - What must be in the contingency plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What must be in the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.52 What must be in the contingency plan? (a) Your contingency plan must: (1) Describe the actions facility personnel will take to comply with §§ 267...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
40 CFR 267.52 - What must be in the contingency plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What must be in the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.52 What must be in the contingency plan? (a) Your contingency plan must: (1) Describe the actions facility personnel will take to comply with §§ 267...
40 CFR 267.52 - What must be in the contingency plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What must be in the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.52 What must be in the contingency plan? (a) Your contingency plan must: (1) Describe the actions facility personnel will take to comply with §§ 267...
Emergency Medical Operations at Kennedy Space Center in Support of Space Shuttle
NASA Technical Reports Server (NTRS)
Myers, K. Jeffrey; Tipton, David A.; Woodard, Daniel; Long, Irene D.
1992-01-01
The unique environment of the Kennedy Space Center includes a wide variety of industrial processes culminating in launch and spaceflight. Many are potentially hazardous to the work force and the astronauts. Technology, planning, training, and quality control are utilized to prevent contingencies and expedite response should a contingency occur.
Emergency medical operations at Kennedy Space Center in support of space shuttle
NASA Technical Reports Server (NTRS)
Myers, K. J.; Tipton, D. A.; Woodard, D.; Long, I. D.
1992-01-01
The unique environment of the Kennedy Space Center includes a wide variety of industrial processes culminating in launch and spaceflight. Many are potentially hazardous to the work force and the astronauts. Technology, planning, training, and quality control are utilized to prevent contingencies and expedite response should a contingency occur.
School management and contingency theory: an emerging perspective.
Hanson, E M
1979-01-01
In an article written for educational administrators, Hanson explains the assumptions, framework, and application of contingency theory. The author sees contingency theory as a way for organizations to adapt to uncertainty by developing a strategic plan with alternative scenarios. He urges school administrators to join businessmen and public managers in using a technique described as "the most powerful current sweeping over the organizational field." The theory assumes that: (1) a maze of goals govern the development of events; (2) different management approaches may be appropriate within the same organization; and (3) different leadership styles suit different situations. Contingency planning helps the organization to respond to uncertainty in the external environment by identifying possible events that may occur and by preparing alternative stratgies to deal with them. Hanson describes the purpose of this process as providing "a more effective match between an organization and its environment." He explains that contingency theory analyzes the internal adjustments of the organization (e.g., decision making process, structure, technology, instructional techniques) as it seeks to meet the shifting demands of its external or internal environments. According to the author, the intent of contingency theory is to establish an optimal "match" between environmental demands (and support) and the response capabilities of the organization including its structure, planning process, and leadership style.
40 CFR 267.53 - Who must have copies of the contingency plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...
40 CFR 267.53 - Who must have copies of the contingency plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...
40 CFR 267.53 - Who must have copies of the contingency plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...
40 CFR 267.53 - Who must have copies of the contingency plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...
40 CFR 267.53 - Who must have copies of the contingency plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...
Bankson, Daniel D; Heim, Joseph A
2014-01-01
To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).
77 FR 76815 - Handling of Animals; Contingency Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... contingency plan system be implemented to accommodate small businesses. As a practical matter, one would... No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant... regulations to add requirements for contingency planning and training of personnel by research facilities and...
14 CFR 431.39 - Mission rules, procedures, contingency plans, and checklists.
Code of Federal Regulations, 2012 CFR
2012-01-01
... mission rules, procedures, checklists, emergency plans, and contingency abort plans, if any, that ensure..., procedures, checklists, emergency plans, and contingency abort plans must be contained in a safety directive...
14 CFR 431.39 - Mission rules, procedures, contingency plans, and checklists.
Code of Federal Regulations, 2014 CFR
2014-01-01
... mission rules, procedures, checklists, emergency plans, and contingency abort plans, if any, that ensure..., procedures, checklists, emergency plans, and contingency abort plans must be contained in a safety directive...
14 CFR 431.39 - Mission rules, procedures, contingency plans, and checklists.
Code of Federal Regulations, 2013 CFR
2013-01-01
... mission rules, procedures, checklists, emergency plans, and contingency abort plans, if any, that ensure..., procedures, checklists, emergency plans, and contingency abort plans must be contained in a safety directive...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
...-AG73] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public... Contingency Plan, to acknowledge advancements in technologies used to manage and convey information to the... Substances Pollution Contingency Plan (NCP), to acknowledge advancements in technologies used to manage and...
40 CFR 264.227 - Emergency repairs; contingency plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...
Code of Federal Regulations, 2013 CFR
2013-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2012 CFR
2012-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2014 CFR
2014-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2013 CFR
2013-07-01
... assistance from Federal authorities operating under existing national and regional contingency plans. (3) A... criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... assistance from Federal authorities operating under existing national and regional contingency plans. (3) A... for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... and is in effect when the Federal Response Plan and some or all its Emergency Support Functions (ESFs... resources that are available for response. (2) The establishment of requirements for federal, regional, and... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
Code of Federal Regulations, 2014 CFR
2014-07-01
... and is in effect when the Federal Response Plan and some or all its Emergency Support Functions (ESFs... resources that are available for response. (2) The establishment of requirements for federal, regional, and... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
Code of Federal Regulations, 2013 CFR
2013-07-01
... and is in effect when the Federal Response Plan and some or all its Emergency Support Functions (ESFs... resources that are available for response. (2) The establishment of requirements for federal, regional, and... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
.... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...
Code of Federal Regulations, 2011 CFR
2011-07-01
... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN... scientific investigations not in support of removal actions or law enforcement, shall be provided by the...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... associated maintenance plans, North Carolina provided contingency measures that included regulation 15A North... contingency measures that were also included in the 1- hour ozone maintenance plans. These contingency... the contingency measures in its SIP for the Charlotte-Gastonia, Greensboro-Winston-Salem-High Point...
Appendix F - Sample Contingency Plan
This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... change the maintenance plan's trigger for contingency measures. Instead of a defined trigger, the revised plan would allow the State to consider several factors in deciding whether contingency measures should... the maintenance plan, the State must commit to implement one or more contingency measures within a set...
Safe Schools: Unified Emergency Contingency Plan for Schools.
ERIC Educational Resources Information Center
Illinois State Police, Springfield.
This contingency plan is intended to stimulate emergency planning and provide an organizational tool for Illinois schools to use in the development of individual emergency plans. It may accommodate and complement a school's current contingency plan and will allow for the inclusion of additional material concerning school safety. It is intended as…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... allow backsliding with respect to new source review, penalties, milestones, contingency plans, and motor... and contingency measures. Each of the section 110(a) (1) plan components is discussed below. (a... of this anomalous violation. (d) Contingency Plan. The section 110(a)(1) maintenance plans include...
30 CFR 582.26 - Contingency Plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Contingency Plan. 582.26 Section 582.26 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...
30 CFR 282.26 - Contingency Plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... Mining Plan. The Contingency Plan shall comply with the requirements of § 282.28(e) of this part. (b) The...
30 CFR 582.26 - Contingency Plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Contingency Plan. 582.26 Section 582.26 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...
30 CFR 582.26 - Contingency Plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Contingency Plan. 582.26 Section 582.26 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... waste management provisions that are sufficient to comply with the requirements of this part. The owner... that the plan be based on the National Response Team's Integrated Contingency Plan Guidance (“One Plan”). When modifications are made to non-RCRA provisions in an integrated contingency plan, the changes do...
International Space Station (ISS) Oxygen High Pressure Storage Management
NASA Technical Reports Server (NTRS)
Lewis, John R.; Dake, Jason; Cover, John; Leonard, Dan; Bohannon, Carl
2004-01-01
High pressure oxygen onboard the ISS provides support for Extra Vehicular Activities (EVA) and contingency metabolic support for the crew. This high pressure 02 is brought to the ISS by the Space Shuttle and is transferred using the Oxygen Recharge Compressor Assembly (ORCA). There are several drivers that must be considered in managing the available high pressure 02 on the ISS. The amount of O2 the Shuttle can fly up is driven by manifest mass limitations, launch slips, and on orbit Shuttle power requirements. The amount of 02 that is used from the ISS high pressure gas tanks (HPGT) is driven by the number of Shuttle docked and undocked EVAs, the type of EVA prebreath protocol that is used and contingency use of O2 for metabolic support. Also, the use of the ORCA must be managed to optimize its life on orbit and assure that it will be available to transfer the planned amount of O2 from the Shuttle. Management of this resource has required long range planning and coordination between Shuttle manifest on orbit plans. To further optimize the situation hardware options have been pursued.
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
40 CFR 265.55 - Emergency coordinator.
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITIES Contingency Plan and Emergency Procedures § 265.55 Emergency coordinator. At all times, there must... aspects of the facility's contingency plan, all operations and activities at the facility, the location... out the contingency plan. [Comment: The emergency coordinator's responsibilities are more fully...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
... (Business Continuity and Contingency Plans) and adopt new Rule 4370--NYSE Amex Equities (Business Continuity... Continuity and Contingency Plans) as substantively duplicative of NASD Rules 3510 (Business Continuity Plans... Equities (Business Continuity and Contingency Plans) to remove the existing text and incorporate NASD Rules...
9 CFR 2.134 - Contingency planning.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Contingency planning. 2.134 Section 2.134 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.134 Contingency planning. (a) Dealers, exhibitors...
9 CFR 2.134 - Contingency planning.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Contingency planning. 2.134 Section 2.134 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE REGULATIONS Miscellaneous § 2.134 Contingency planning. (a) Dealers, exhibitors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control, Water... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...
Code of Federal Regulations, 2010 CFR
2010-07-01
..., LOCAL AND REGIONAL OIL REMOVAL CONTINGENCY PLANS § 109.6 Coordination. For the purposes of coordination, the contingency plans of State and local governments should be developed and implemented in consultation with private interests. A copy of any oil removal contingency plan developed by State and local...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... to inclusion of CSAPR as a potential contingency measure in Illinois' ozone maintenance plan. In..., after promulgation by USEPA'' as a possible contingency measure in the maintenance plan, this measure is only one of many that may be selected should the contingency plan be triggered. EPA has concluded, in...
2009-04-03
the concept calls for interagency task forces ( IATF ) co-led by a Special Representative of the President and the Commander of a military Joint Task...functional lines, civilian and military members comprise the IATF staff. Furthermore, when possible, the concept establishes the IATF early outside the...prepare and plan for the complex contingency. When deployed, the IATF relies on the military joint task force for most of its support including
Charlton, Kimberly; Kumar, Saravana
2017-01-01
Objective Despite consistent evidence for the positive impact of contingency planning for falls in older people, implementation of plans often fail. This is likely due to lack of recognition and knowledge about perspectives of older people about contingency planning. The objective of this research was to explore the perspectives of older people living in the community about use of contingency planning for getting help quickly after a fall. Method A systematic literature search seeking qualitative research was conducted in April 2014, with no limit placed on date of publication. Medline, EMBASE, Ageline, CINAHL, HealthSource- Nursing/Academic Edition, AMED and Psych INFO databases were searched. Three main concepts were explored and linked using Boolean operators; older people, falls and contingency planning. The search was updated until February 2016 with no new articles found. After removal of duplicates, 562 articles were assessed against inclusion and exclusion criteria resulting in six studies for the meta-synthesis. These studies were critically appraised using the McMaster critical appraisal tool. Bespoke data extraction sheets were developed and a meta-synthesis approach was adopted to extract and synthesise findings. Findings Three themes of ‘a mix of attitudes’, ‘careful deliberations’ and ‘a source of anxiety’ were established. Perspectives of older people were on a continuum between regarding contingency plans as necessary and not necessary. Levels of engagement with the contingency planning process seemed associated with acceptance of their risk of falling and their familiarity with available contingency planning strategies. Conclusion Avoiding a long lie on the floor following a fall is imperative for older people in the community but there is a lack of knowledge about contingency planning for falls. This meta-synthesis provides new insights into this area of health service delivery and highlights that implementation of plans needs to be directed by the older people rather than the health professionals. PMID:28562596
Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana
2017-01-01
Despite consistent evidence for the positive impact of contingency planning for falls in older people, implementation of plans often fail. This is likely due to lack of recognition and knowledge about perspectives of older people about contingency planning. The objective of this research was to explore the perspectives of older people living in the community about use of contingency planning for getting help quickly after a fall. A systematic literature search seeking qualitative research was conducted in April 2014, with no limit placed on date of publication. Medline, EMBASE, Ageline, CINAHL, HealthSource- Nursing/Academic Edition, AMED and Psych INFO databases were searched. Three main concepts were explored and linked using Boolean operators; older people, falls and contingency planning. The search was updated until February 2016 with no new articles found. After removal of duplicates, 562 articles were assessed against inclusion and exclusion criteria resulting in six studies for the meta-synthesis. These studies were critically appraised using the McMaster critical appraisal tool. Bespoke data extraction sheets were developed and a meta-synthesis approach was adopted to extract and synthesise findings. Three themes of 'a mix of attitudes', 'careful deliberations' and 'a source of anxiety' were established. Perspectives of older people were on a continuum between regarding contingency plans as necessary and not necessary. Levels of engagement with the contingency planning process seemed associated with acceptance of their risk of falling and their familiarity with available contingency planning strategies. Avoiding a long lie on the floor following a fall is imperative for older people in the community but there is a lack of knowledge about contingency planning for falls. This meta-synthesis provides new insights into this area of health service delivery and highlights that implementation of plans needs to be directed by the older people rather than the health professionals.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 42 U.S.C. 9601, or the National Oil and Hazardous Substances Pollution Contingency Plan, 40 CFR part... any party, and any attorney of record for any of the foregoing persons. (h) National Contingency Plan or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan, developed under...
77 FR 11519 - Commission Information Collection Activities; Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... collection, FERC-585, Reporting of Electric Energy shortages and Contingency Plans under PURPA. DATES... shortages and Contingency Plans under PURPA. OMB Control No.: 1902-0138. Type of Request: Three-year... Energy Shortages and Contingency Plans under PURPA'', is used by the Commission to implement the...
40 CFR 51.152 - Contingency plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS... emergency agencies and news media. (c) Each plan for a Priority IA and II region must include a contingency...
40 CFR 51.152 - Contingency plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS... emergency agencies and news media. (c) Each plan for a Priority IA and II region must include a contingency...
40 CFR 51.152 - Contingency plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS... emergency agencies and news media. (c) Each plan for a Priority IA and II region must include a contingency...
40 CFR 51.152 - Contingency plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS... emergency agencies and news media. (c) Each plan for a Priority IA and II region must include a contingency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of California, through the California...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Pasley..., as amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... contingency plan must be designed to minimize hazards to human health or the environment from fires...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-02
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Maine, through the Maine Department of... preclude future actions under Superfund. This partial deletion pertains to all Site media (including soil...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-21
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... opportunities for investigation and soil remediation, if the Program's Work Group determines that lead in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil and ground water associated with the northern 62-acre parcel. After this...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-03
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-19
...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-14
... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
..., Superfund, Water pollution control, Water supply. Dated: September 26, 2013. Judith A. Enck, Regional...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Pollution Contingency Plan (NCP). The EPA and the State of New York, through the Department of Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... a Maintenance Plan, Including a Contingency Plan, for the Area Under Section 175a of the CAA 1. An.... Contingency Provisions That EPA Deems Necessary to Promptly Correct Any Violation of the NAAQS That Occurs... available control measures, and contingency measures) no longer applies for so long as the area continues to...
DeLargy, Pamela; Alakbarov, Ramiz
2004-09-01
The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
...] Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures for 1997...) contingency measure requirements for the 1997 annual and 24-hour national ambient air quality standard (NAAQS... Contingency Measures for the 2007 PM 2.5 SIP'' (dated October 2011), which the California Air Resources Board...
Code of Federal Regulations, 2012 CFR
2012-07-01
... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Development and implementation...
77 FR 28861 - Commission Information Collection Activities (FERC-585); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... Energy shortages and Contingency Plans under PURPA, to the Office of Management and Budget (OMB) for... Contingency Plans under PURPA. OMB Control No.: 1902-0138. Type of Request: Three-year extension of the FERC... Contingency Plans under PURPA'', is used by the Commission to implement the statutory provisions of section...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... available control measures (RACM), a reasonable further progress (RFP) plan, \\2\\ contingency measures, a..., contingency measures, and other planning SIP revisions related to attainment of the standard were suspended as...,'' Memorandum from G. T. Helms, Chief, Ozone/Carbon Monoxide Programs Branch, April 30, 1992; 3. ``Contingency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... submitted a revision to the contingency portion of the Maintenance Plan. These submitted SIP revisions are..., penalties, milestones, contingency plans, and motor vehicle emission budgets. Consequently, the Court's... illustrating how the area will continue in attainment of the 1997 ozone NAAQS and contingency measures. Our...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Utah, through the Utah Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Delete the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... requirements, Superfund, Water pollution control, Water Supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Martin... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA, with the...
Contingency Planning for Planetary Rovers
NASA Technical Reports Server (NTRS)
Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)
2002-01-01
There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.
Incremental Contingency Planning
NASA Technical Reports Server (NTRS)
Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David E.; Washington, Rich
2003-01-01
There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.
Optimal Limited Contingency Planning
NASA Technical Reports Server (NTRS)
Meuleau, Nicolas; Smith, David E.
2003-01-01
For a given problem, the optimal Markov policy over a finite horizon is a conditional plan containing a potentially large number of branches. However, there are applications where it is desirable to strictly limit the number of decision points and branches in a plan. This raises the question of how one goes about finding optimal plans containing only a limited number of branches. In this paper, we present an any-time algorithm for optimal k-contingency planning. It is the first optimal algorithm for limited contingency planning that is not an explicit enumeration of possible contingent plans. By modelling the problem as a partially observable Markov decision process, it implements the Bellman optimality principle and prunes the solution space. We present experimental results of applying this algorithm to some simple test cases.
Code of Federal Regulations, 2010 CFR
2010-07-01
... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... how each area will continue attainment of the 1997 8-hour ozone NAAQS, and provide contingency... one of these areas is found to violate the 1997 ozone standards, the contingency plan section of each... returns to maintenance of the 1997 ozone standards. Please see section (d) Contingency Plan, below, for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
..., contingency measures, and other planning SIPs related to the attainment of either the 1997 annual or 2006 24... contingency measures, with a schedule for implementation, as EPA deems necessary to assure prompt correction... continued attainment; and (5) a contingency plan to prevent or correct future violations of the NAAQS. III...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-20
..., Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hooker..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...
Dengue Contingency Planning: From Research to Policy and Practice.
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini
2016-09-01
Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
Spaceflight Decompression Sickness Contingency Plan
NASA Technical Reports Server (NTRS)
Dervay, Joseph P.
2007-01-01
A viewgraph presentation on the Decompression Sickness (DCS) Contingency Plan for manned spaceflight is shown. The topics include: 1) Approach; 2) DCS Contingency Plan Overview; 3) Extravehicular Activity (EVA) Cuff Classifications; 4) On-orbit Treatment Philosophy; 5) Long Form Malfunction Procedure (MAL); 6) Medical Checklist; 7) Flight Rules; 8) Crew Training; 9) Flight Surgeon / Biomedical Engineer (BME) Training; and 10) DCS Emergency Landing Site.
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must... that all information contained in the plan is updated annually and that appropriate persons are...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Substances and Disease Registry CDC—Centers for Disease Control DOC—Department of Commerce DOD—Department of... Response Advisory Team DRG—District Response Group ERT—Environmental Response Team ESF—Emergency Support... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Licensee's Organizational Structure for Contingency Responses—A delineation of the organization's chain of.... The following topics must be addressed: a. Organizational Structure. The safeguards contingency plan... individual, group, or organizational entity responsible for each decision and action. The goals of licensee...
40 CFR 264.55 - Emergency coordinator.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Contingency Plan and Emergency Procedures § 264.55 Emergency coordinator. At all times, there must be at least...'s contingency plan, all operations and activities at the facility, the location and characteristics... addition, this person must have the authority to commit the resources needed to carry out the contingency...
A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration
NASA Technical Reports Server (NTRS)
Merrill, R. Gabe; Andraschko, Mark; Stromgren, Chel; Cirillo, Bill; Earle, Kevin; Goodliff, Kandyce
2008-01-01
Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.
33 CFR 385.28 - Operating Manuals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... natural system; (vii) Include a drought contingency plan as required by § 222.5(i)(5) of this chapter and Engineer Regulation ER 1110-2-1941 “Drought Contingency Plans” that is consistent with the Water Rights... events, as well as by including a drought contingency plan. (A) Emergency deviations. Examples of some...
33 CFR 385.28 - Operating Manuals.
Code of Federal Regulations, 2013 CFR
2013-07-01
... natural system; (vii) Include a drought contingency plan as required by § 222.5(i)(5) of this chapter and Engineer Regulation ER 1110-2-1941 “Drought Contingency Plans” that is consistent with the Water Rights... events, as well as by including a drought contingency plan. (A) Emergency deviations. Examples of some...
33 CFR 385.28 - Operating Manuals.
Code of Federal Regulations, 2012 CFR
2012-07-01
... natural system; (vii) Include a drought contingency plan as required by § 222.5(i)(5) of this chapter and Engineer Regulation ER 1110-2-1941 “Drought Contingency Plans” that is consistent with the Water Rights... events, as well as by including a drought contingency plan. (A) Emergency deviations. Examples of some...
33 CFR 385.28 - Operating Manuals.
Code of Federal Regulations, 2011 CFR
2011-07-01
... natural system; (vii) Include a drought contingency plan as required by § 222.5(i)(5) of this chapter and Engineer Regulation ER 1110-2-1941 “Drought Contingency Plans” that is consistent with the Water Rights... events, as well as by including a drought contingency plan. (A) Emergency deviations. Examples of some...
33 CFR 385.28 - Operating Manuals.
Code of Federal Regulations, 2014 CFR
2014-07-01
... natural system; (vii) Include a drought contingency plan as required by § 222.5(i)(5) of this chapter and Engineer Regulation ER 1110-2-1941 “Drought Contingency Plans” that is consistent with the Water Rights... events, as well as by including a drought contingency plan. (A) Emergency deviations. Examples of some...
18 CFR 375.303 - Delegations to the Director of the Office of Electric Reliability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... uncontested contingency plans regarding shortages of electric energy or capacity, circumstances which may result in such shortages, and accommodations of any such shortages or circumstances, if said contingency... Commission, if the filings comply with the terms of the waivers; (ii) Reject a contingency plan regarding...
Challenges Encountered During the Veterinary Disaster Response: An Example from Chile
Garde, Elena; Pérez, Guillermo Enrique; Acosta-Jamett, Gerardo; Bronsvoort, Barend Mark
2013-01-01
Simple Summary Disaster preparedness for companion animals has economic, social and welfare benefits, yet many countries continue to omit dogs and cats from their national and regional contingency planning. Responses therefore, are often chaotic, inefficient and uncoordinated, or absent altogether. Documented experiences in Chile contribute to the information supporting the inclusion of companion animals into locally relevant disaster plans. These plans serve to prepare communities and authorities, identify resources available, establish a chain of command, develop local priorities, and subsequently reduce the negative impacts on both human and animal communities. Abstract Large-scale disasters have immeasurable effects on human and animal communities. Evaluating and reporting on the response successes and difficulties encountered serves to improve existing preparedness documents and provide support to those in the process of developing plans. Although the majority of disasters occur in low and middle income nations, less than 1% of the disaster literature originates from these countries. This report describes a response to a disease outbreak in domestic dogs in Dichato, Chile following the 2010 earthquake/tsunami. With no national plan coordinating the companion animal response, there was a chaotic approach among animal welfare organizations towards rescue, diagnosis, treatment and record-keeping. Similar to the medical response following the 1985 earthquake near Santiago, we experienced problems within our own teams in maintenance of data integrity and protocol compliance. Loss of infrastructure added complications with transportation, communications and acquisition of supplies. Similar challenges likely occur in most disasters, but can be reduced through pro-active planning at national and local levels. There is sufficient information to support the human and animal welfare benefits of including companion animals in national planning, and lessons learned through this and other experiences can assist planners in the development of comprehensive and locally relevant contingency plans. PMID:26479753
Dengue Contingency Planning: From Research to Policy and Practice
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini
2016-01-01
Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN State... either assume the lead through a cooperative agreement for the response action or may be the support agency in EPA-lead remedial response. Section 300.515 sets forth requirements for state involvement in...
Report: EPA Could Improve Contingency Planning for Oil and Hazardous Substance Response
Report #13-P-0152, February 15, 2013. EPA regions have expanded contingency planning by creating additional plans and materials, but regions cannot maintain this large volume of information with their limited resources.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
... demonstrations, contingency measures and any other planning requirements of the Clean Air Act related to... States to submit certain reasonable further progress plans, attainment demonstrations, contingency... contingency measures or major source penalty fee programs among the measures retained as one-hour ozone anti...
5 CFR 890.504 - Disposition of contingency reserves upon reorganization or merger of plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Disposition of contingency reserves upon reorganization or merger of plans. 890.504 Section 890.504 Administrative Personnel OFFICE OF PERSONNEL... Contributions and Withholdings § 890.504 Disposition of contingency reserves upon reorganization or merger of...
New Horizons Launch Contingency Effort
NASA Astrophysics Data System (ADS)
Chang, Yale; Lear, Matthew H.; McGrath, Brian E.; Heyler, Gene A.; Takashima, Naruhisa; Owings, W. Donald
2007-01-01
On 19 January 2006 at 2:00 PM EST, the NASA New Horizons spacecraft (SC) was launched from the Cape Canaveral Air Force Station (CCAFS), FL, onboard an Atlas V 551/Centaur/STAR™ 48B launch vehicle (LV) on a mission to explore the Pluto Charon planetary system and possibly other Kuiper Belt Objects. It carried a single Radioisotope Thermoelectric Generator (RTG). As part of the joint NASA/US Department of Energy (DOE) safety effort, contingency plans were prepared to address the unlikely events of launch accidents leading to a near-pad impact, a suborbital reentry, an orbital reentry, or a heliocentric orbit. As the implementing organization. The Johns Hopkins University Applied Physics Laboratory (JHU/APL) had expanded roles in the New Horizons launch contingency effort over those for the Cassini mission and Mars Exploration Rovers missions. The expanded tasks included participation in the Radiological Control Center (RADCC) at the Kennedy Space Center (KSC), preparation of contingency plans, coordination of space tracking assets, improved aerodynamics characterization of the RTG's 18 General Purpose Heat Source (GPHS) modules, and development of spacecraft and RTG reentry breakup analysis tools. Other JHU/APL tasks were prediction of the Earth impact footprints (ElFs) for the GPHS modules released during the atmospheric reentry (for purposes of notification and recovery), prediction of the time of SC reentry from a potential orbital decay, pre-launch dissemination of ballistic coefficients of various possible reentry configurations, and launch support of an Emergency Operations Center (EOC) on the JHU/APL campus. For the New Horizons launch, JHU/APL personnel at the RADCC and at the EOC were ready to implement any real-time launch contingency activities. A successful New Horizons launch and interplanetary injection precluded any further contingency actions. The New Horizons launch contingency was an interagency effort by several organizations. This paper describes JHU/APL's roles and responsibilities in the launch contingency effort, and the specific tasks to fulfill those responsibilities. The overall effort contributed to mission safety and demonstrated successful cooperation between several agencies.
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Federal contingency plans. 300.210...
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Federal contingency plans. 300.210...
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Federal contingency plans. 300.210...
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Federal contingency plans. 300.210...
NASA Technical Reports Server (NTRS)
Adeleye, Sanya; Chung, Christopher
2006-01-01
Commercial aircraft undergo a significant number of maintenance and logistical activities during the turnaround operation at the departure gate. By analyzing the sequencing of these activities, more effective turnaround contingency plans may be developed for logistical and maintenance disruptions. Turnaround contingency plans are particularly important as any kind of delay in a hub based system may cascade into further delays with subsequent connections. The contingency sequencing of the maintenance and logistical turnaround activities were analyzed using a combined network and computer simulation modeling approach. Experimental analysis of both current and alternative policies provides a framework to aid in more effective tactical decision making.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-01
This module includes the following: Regulatory Summary (Definitions; National Contingency Plan; Notification or Discovery; Response Process; Removal Process; Remedial Process; Community Involvement; State Role; Natural Resource Damage Assessments; Federal Facility Response; and Contractor Support); and Module Summary.
40 CFR 51.152 - Contingency plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency...
40 CFR 300.1 - Purpose and objectives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY... Substances Pollution Contingency Plan (NCP) is to provide the organizational structure and procedures for...
A winning combination: the 3Cs of business continuity.
Glendon, Lee
2013-01-01
Contingency planning is a natural part of business life and is used across identified strategic, financial and operational risks. But is it being done well and is it the right approach all of the time? This paper shows how contingency planning forms one layer of a three-line defence termed 'the 3Cs of business continuity': contingency planning; continuity capability; crisis response. Collectively, 'the 3Cs' help organisations deliver a robust response to the risks that can be seen and those that cannot.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... with the cognizant comptroller, as the operational area evolves into a more stable business environment... conditions exist that limit normal business operations during emergencies and contingency operations. It also... review under Section 6(b) of Executive Order 12866, Regulatory Planning and Review, dated September 30...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
... Emission Inventory, Contingency Measures, Reasonably Available Control Measures, and Transportation... Implementation Plan (SIP) to meet the 2002 base year emissions inventory, the reasonable further progress (RFP) plan, RFP contingency measure, and reasonably available control measure (RACM) requirements of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
This bill would amend the Federal Water Pollution Control Act to empower the President to determine areas for which a oil or hazardous material discharge contingency plan is necessary and to require terminal operators, vessel operators, and other parties directly involved in the transport of oil or hazardous materials to prepare a contingency plan and to submit this plan for approval to the President on a periodic basis. In the event of a discharge, the President is responsible for seeing that the removal plan is implemented and for requiring any changes as he may determine to be necessary. The Presidentmore » can deny entry to any port to any vessel or deny movement of substances through any terminal facility, if the vessel or facility operators do not have a current and approved contingency plan in effect.« less
Integrated Demonstration of Instrument Placement , Robust Execution and Contingent Planning
NASA Technical Reports Server (NTRS)
Pedersen, L.; Bualat, M.; Lees, D.; Smith, D. E.; Korsmeyer, David (Technical Monitor); Washington, R.
2003-01-01
This paper describes an integrated demonstration of ground-based contingent planning, robust execution and autonomous instrument placement for the efficient exploration of a site by a prototype Mars rover.
Development of Medical Technology for Contingency Response to Marrow Toxic Agents
2012-04-26
Biodefense Strategy, Practice, and Science • a manuscript in press for Leukemia on response to the Fukushima Daiichi nuclear power plant incident • a... awareness of the Transplant Centerl Contingency Planning Committee and educate the transplant community about the critical imp011ance of establishing a...nationwide contingency response plan. Increase understanding ofthe immunologic factors important in HSC transplantation. Create a that facilitates
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-26
...: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce... Liability Act of 1980 (CERCLA), the Oil Pollution Act (OPA) of 1990, the Clean Water Act (CWA), the National Oil and Hazardous Substances Pollution Contingency Plan (National Contingency Plan [NCP]), and other...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or...
49 CFR 1105.7 - Environmental reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the extent available) on derailments, accidents and spills; contingency plans to deal with accidental... and hazardous spills; the contingency plans to deal with accidental spills; and the likelihood of an..., county, and subdivision, including a plan view, at a scale not to exceed 1:24,000 (71/2 minute U.S.G.S...
76 FR 66229 - Transmission Planning Reliability Standards
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
... Transmission Services, at all demand levels over the range of forecast system demands, under the contingency... any planned firm load that is not directly served by the elements that are removed from service as a... to plan for the loss of firm service for a single contingency, the Commission finds that their...
25 CFR 39.501 - What is an emergency or unforeseen contingency?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...
Oil, biological communities and contingency planning
Albers, P.H.; Frink, Lynne; Ball-Weir, Katherine; Smith, Charlotte
1995-01-01
The Oil Pollution Act of 1990 mandates the inclusion of a fish and wildlife response plan in the National Contingency Plan (NCP) and the creation of Area Committees that must develop an Area Contingency Plan (ACP). Area Contingency Plans must include a detailed annex containing a Fish and Wildlife and Sensitive Environments Plan. Tank vessels, offshore facilities, and certain onshore facilities must have response plans consistent with the requirements of the NCP and the ACP. New regulations to supersede the Type A and B procedures of the Natural Resources Damage Assessment Regulations are being developed for oil spills. Currently, four assessment methods have been proposed: (1) Type A, (2) comprehensive (Type B), (3) intermediate (between types A and B), and (4) compensation tables. The Oil Spill Liability Trust Fund is approaching its ceiling of $1 billion, but only $50 million has been appropriated. Effective biological contingency planning requires extensive knowledge of (1) the environmental fate of petroleum, (2) the effects of petroleum on organisms, (3) the existing biological resources, and (4) the establishment of a system of biological priorities. The characteristics and fate of petroleum and the biological effects of petroleum are reviewed. Assessment of biological resources includes plant and animal distributions, important habitat, endangered or threatened species, and economic considerations. The establishment by Area Committees of priorities for environmental protection, injury assessment, and restoration will promote efficient spill response. Three special issues are discussed: (1) improving our ability to restore natural resources, (2) the potential role of biological diversity in spill response planning, and (3) planning for animal rehabilitation.
NASA Technical Reports Server (NTRS)
Vigeant-Langlois, Laurence; Hansman, R. John, Jr.
2003-01-01
The objective of this project was to propose a means to improve aviation weather information, training procedures based on a human-centered systems approach. Methodology: cognitive analysis of pilot's tasks; trajectory-based approach to weather information; contingency planning support; and implications for improving weather information.
National Oil and Hazardous Substances Pollution Contingency Plan
DOT National Transportation Integrated Search
1996-07-01
The purpose of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) is to provide the organizational structure and procedures for preparing for and responding to discharges of oil and releases of hazardous substances, pollutants...
National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet
This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.
National Contingency Plan Subpart J
Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRCRAFT OPERATOR SECURITY: AIR CARRIERS AND... notified of any changes. (c) Participate in an airport-sponsored exercise of the airport contingency plan...
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRCRAFT OPERATOR SECURITY: AIR CARRIERS AND... notified of any changes. (c) Participate in an airport-sponsored exercise of the airport contingency plan...
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRCRAFT OPERATOR SECURITY: AIR CARRIERS AND... notified of any changes. (c) Participate in an airport-sponsored exercise of the airport contingency plan...
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRCRAFT OPERATOR SECURITY: AIR CARRIERS AND... notified of any changes. (c) Participate in an airport-sponsored exercise of the airport contingency plan...
Contingency Planning for Natural Disasters: The Mount St. Helens Experience. AIR Forum 1981 Paper.
ERIC Educational Resources Information Center
Burns, James A.; Concordia, Louis R.
The effectiveness of existing contingency planning efforts at five community colleges, three colleges, and five universities during the Mount St. Helens eruptions in 1980 in Washington state was assessed. Planning efforts in the areas of institutional policy, academic policy, business office, physical plant, residence halls, financial aid, and…
42 CFR 9.4 - Physical facility policies and design.
Code of Federal Regulations, 2010 CFR
2010-10-01
....edu; or view it online at http://oacu.od.nih.gov/regs/guide/guidex.htm. You may inspect a copy at NIH... required to develop disaster and escaped animal contingency plans? The sanctuary facility must prepare disaster and escaped animal contingency plans outlining simple and easy to follow plans for dealing with...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential parcels identified in the June 4, 2013 FR NOIPD. The remaining residential parcels with soil lead levels...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-13
... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control, Water...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control, Water... and Hazardous Substances Pollution Contingency Plan; National Priorities List AGENCY: Environmental...
2016-09-01
unneeded to support U.S. forces in the CENTCOM area of responsibility and in future contingencies worldwide. View GAO-16-406. For more information...DEFENSE INFRASTRUCTURE Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency ...Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations Why GAO Did This Study For about 15 years, DOD
Contingent plan structures for spacecraft
NASA Technical Reports Server (NTRS)
Drummond, M.; Currie, K.; Tate, A.
1987-01-01
Most current AI planners build partially ordered plan structures which delay decisions on action ordering. Such structures cannot easily represent contingent actions. A representation which can is presented. The representation has some other useful features: it provides a good account of the causal structure of a plan, can be used to describe disjunctive actions, and it offers a planner the opportunity of even less commitment than the classical partial order on actions. The use of this representation is demonstrated in an on-board spacecraft activity sequencing problem. Contingent plan execution in a spacecraft context highlights the requirements for a fully disjunctive representation, since communication delays often prohibit extensive ground-based accounting for remotely sensed information and replanning on execution failure.
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...
Fire! Anguish! Dumb Luck! or Contingency Planning.
ERIC Educational Resources Information Center
Wright, Gordon H.
1979-01-01
Suggests nine requirements for a contingency plan to assure a library's successful recovery from a disaster. A discussion of the salvage team, security, and staff problems follows an enumeration of helpful supplies and equipment. Appended is a sample emergency procedure checklist. (SW)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-13
... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... requirements, Superfund, Water pollution control, Water supply. Dated: July 3, 2013. A. Stanley Meiburg, Acting...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... National Oil and [[Page 56612
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... Income Contingent Repayment Plan Alternative Documentation of Income SUMMARY: This form serves as the means by which a borrower who is repaying Direct Loan Program loans under the Income-Contigent Repayment (ICR) Plan or the Income-Based Repayment (IBR) Plan provides the U.S. Department of Education (the...
Development of Medical Technology for Contingency Response to Marrow Toxic Agents
1. Contingency Preparedness: Collect information from transplant centers, build awareness of the Transplant Center Contingency Planning Committee and...Matched Donors: Increase operational efficiencies that accelerate the search process and increase patient access are key to preparedness in a contingency ...Transplantation: Create a platform that facilitates multicenter collaboration and data management.
Space Flight Decompression Sickness Contingency Plan
NASA Technical Reports Server (NTRS)
Dervay, Joseph; Gernhardt, Michael L.; Ross, Charles E.; Hamilton, Douglas; Homick, Jerry L. (Technical Monitor)
2000-01-01
The purpose was to develop an enhanced plan to diagnose, treat, and manage decompression sickness (DCS) during extravehicular activity (EVA). This plan is merited by the high frequency of upcoming EVAs necessary to construct and maintain the International Space Station (ISS). The upcoming ISS era will demand a significant increase in EVA. The DCS Risk and Contingency Plan provided a new and improved approach to DCS reporting, treatment, management, and training.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
...://www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know your... hazard ranking system. III. Deletion Procedures The following procedures apply to deletion of this Site... Delete the Site from the NPL. (4) The EPA placed copies of documents supporting the proposed deletion in...
Robustness via Run-Time Adaptation of Contingent Plans
NASA Technical Reports Server (NTRS)
Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)
2000-01-01
In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.
Contingency Management Requirements Document: Preliminary Version. Revision F
NASA Technical Reports Server (NTRS)
2005-01-01
This is the High Altitude, Long Endurance (HALE) Remotely Operated Aircraft (ROA) Contingency Management (CM) Functional Requirements document. This document applies to HALE ROA operating within the National Airspace System (NAS) limited at this time to enroute operations above 43,000 feet (defined as Step 1 of the Access 5 project, sponsored by the National Aeronautics and Space Administration). A contingency is an unforeseen event requiring a response. The unforeseen event may be an emergency, an incident, a deviation, or an observation. Contingency Management (CM) is the process of evaluating the event, deciding on the proper course of action (a plan), and successfully executing the plan.
78 FR 33157 - Incentives for Nondiscriminatory Wellness Programs in Group Health Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... business practice. A plan may also distinguish between beneficiaries based on, for example, their... participatory wellness programs and health-contingent wellness programs. Examples of participatory wellness... employees for attending a monthly, no-cost health education seminar. Examples of health-contingent wellness...
40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What is the purpose of the contingency plan and how do I use it? 267.51 Section 267.51 Protection of Environment ENVIRONMENTAL PROTECTION... facility. You must design the plan to minimize hazards to human health or the environment from fires...
Communications Contingency Plan: Planning for Crises and Controversy. Phase 1
NASA Technical Reports Server (NTRS)
Treise, Deborah; Bernstein, Arla G.; Yates, Brad
1998-01-01
Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.
78 FR 75475 - National Priorities List, Final Rule No. 57
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-12
... Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals, Hazardous... Act''), as amended, requires that the National Oil and Hazardous Substances Pollution Contingency Plan... Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR Part 300, on July 16, 1982 (47 FR 31180...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Pennsylvania Ave., NW., Washington, DC 20460. National Contingency Plan or NCP means the National Oil and Hazardous Substances Pollution Contingency Plan developed under section 311(c) of the Clean Water Act and... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Definitions. 305.3 Section 305.3...
10 CFR 72.184 - Safeguards contingency plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part..., and Responsibility Matrix, the first four categories of information relating to nuclear facilities licensed under part 50 of this chapter. (The fifth and last category of information, Procedures, does not...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-21
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Rocky Mountain Arsenal Federal Facility AGENCY: Environmental Protection Agency. ACTION: Proposed rule... Notice of Intent to Delete portions of the Rocky Mountain Arsenal Federal Facility (RMA) from the...
75 FR 64976 - National Priorities List, Proposed Rule No. 53
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... Substances Pollution Contingency Plan (``NCP'') include a list of national priorities among the known... submit comments after the public comment period is over? I. May I view public comments submitted by..., EPA promulgated the revised National Oil and Hazardous Substances Pollution Contingency Plan (``NCP...
77 FR 27368 - National Priorities List, Final Rule No. 54
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... Contingency Plan (``NCP'') include a list of national priorities among the known releases or threatened..., the EPA promulgated the revised National Oil and Hazardous Substances Pollution Contingency Plan... imply that the Jones company is responsible for the contamination located on the plant site. EPA...
NASA Technical Reports Server (NTRS)
Hase, Chris
2010-01-01
In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.
48 CFR 252.232-7011 - Payments in Support of Emergencies and Contingency Operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Emergencies and Contingency Operations. 252.232-7011 Section 252.232-7011 Federal Acquisition Regulations... Emergencies and Contingency Operations. As prescribed in section 232.908, use the following clause: PAYMENTS IN SUPPORT OF EMERGENCIES AND CONTINGENCY OPERATIONS (JUL 2010) (a) Definitions of pertinent terms...
Hick, John L; Christian, Michael D; Sprung, Charles L
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit (ICU) and hospital preparations for a mass disaster or influenza epidemic with a specific focus on surge capacity and infrastructure considerations. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including surge capacity and infrastructure considerations. Key recommendations include: (1) hospitals should increase their ICU beds to the maximal extent by expanding ICU capacity and expanding ICUs into other areas; (2) hospitals should have appropriate beds and monitors for these expansion areas; hospitals should develop contingency plans at the facility and government (local, state, provincial, national) levels to provide additional ventilators; (3) hospitals should develop a phased staffing plan (nursing and physician) for ICUs that provides sufficient patient care supervision during contingency and crisis situations; (4) hospitals should provide expert input to the emergency management personnel at the hospital both during planning for surge capacity as well as during response; (5) hospitals should assure that adequate infrastructure support is present to support critical care activities; (6) hospitals should prioritize locations for expansion by expanding existing ICUs, using postanesthesia care units and emergency departments to capacity, then step-down units, large procedure suites, telemetry units and finally hospital wards. Judicious planning and adoption of protocols for surge capacity and infrastructure considerations are necessary to optimize outcomes during a pandemic.
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-13
... of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals, Hazardous... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-1999-0013; FRL-9503-8] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hiteman...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals, Hazardous waste... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2000-0003; FRL-9501-1] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-12
... Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois Environmental.... List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-1983-0002; FRL-9657-6] National Oil...
40 CFR 267.58 - What notification and recordkeeping must I do after an emergency?
Code of Federal Regulations, 2013 CFR
2013-07-01
... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.58 What..., and details of any incident that requires implementing the contingency plan in the operating record...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for Deletion of the State Marine of Port Arthur Superfund Site AGENCY: Environmental Protection Agency. ACTION... Delete the State Marine of Port Arthur (SMPA) Superfund Site located in Port Arthur, Texas, from the...
14 CFR 431.39 - Mission rules, procedures, contingency plans, and checklists.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Mission rules, procedures, contingency plans, and checklists. 431.39 Section 431.39 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION... safe conduct of mission operations during nominal and non-nominal vehicle flight. (b) Mission rules...
14 CFR 431.39 - Mission rules, procedures, contingency plans, and checklists.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Mission rules, procedures, contingency plans, and checklists. 431.39 Section 431.39 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION... safe conduct of mission operations during nominal and non-nominal vehicle flight. (b) Mission rules...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... and Hazardous Substances Pollution Contingency Plan; National Priorities List AGENCY: Environmental...: List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601...
76 FR 57702 - National Priorities List, Proposed Rule No. 55
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... the National Oil and Hazardous Substances Pollution Contingency Plan (``NCP'') include a list of... submit comments after the public comment period is over? I. May I view public comments submitted by... Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180...
75 FR 59983 - National Priorities List, Final Rule-Newtown Creek
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... Contingency Plan (``NCP'') include a list of national priorities among the known releases or threatened... National Oil and Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...
77 FR 15276 - National Priorities List, Final Rule No. 53
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
..., requires that the National Oil and Hazardous Substances Pollution Contingency Plan (``NCP'') include a list... Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180... ``Jones Co. plant site,'' does not imply that the Jones company is responsible for the contamination...
75 FR 9790 - National Priorities List, Final Rule-Gowanus Canal
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... Contingency Plan (``NCP'') include a list of national priorities among the known releases or threatened... National Oil and Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Act (CERCLA) of 1980, is an Appendix of the National Oil and Hazardous Substances Pollution...
2010-03-01
that is becoming the norm in military operations, especial rapid response. Significance : The context of the work for this project focused on one...Time constraint variance ................................................................... 37 DRDC Valcartier CR 2010-353 xiii 3.5.8.1...employment activities that are normally recurring in nature and fall within the delegated authority of an appointed standing operational Commander
A positive risk approach when clients choose to live at risk: a palliative case discussion.
De Bono, Christopher E; Henry, Blair
2016-09-01
The article discusses recent approaches in the literature about clients who chose to live at risk in their homes. It argues for a positive risk-based approach and a tool to help manage risk in the home, and applies these to a hypothetical end-of-life scenario. Historically, safety plans to consider risk management involved a culture of risk aversion supported by sometimes paternalistic motives intended to protect vulnerable clients. New findings in the literature engage in a process that respects the ethical principles underlying harm reduction philosophies. The literature also argues for a perspective that moves away from viewing risk as only harmful, to one that supports a positive understanding of risk as part of a client's informed choice. A risk support management plan, based on a positive approach, can provide a way to both support a client's choice to live at risk, anticipate for expected complications, and inform the creation of a contingency plan to address concerns as they may arise. The added value of a structured approach like the one proposed here for risk support management plans is that it provides adequate due diligence and informed decision-making when planning for risk-taking in complex situations.
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Shane
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less
ERIC Educational Resources Information Center
Romanowich, Paul; Lamb, R. J.
2010-01-01
Contingent incentives can reduce substance abuse. Escalating payment schedules, which begin with a small incentive magnitude and progressively increase with meeting the contingency, increase smoking abstinence. Likewise, descending payment schedules can increase cocaine abstinence. The current experiment enrolled smokers without plans to quit in…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... to 40 CFR 300.805(c) of the NCP to broaden the technology, to include computer telecommunications or.... Specifically, this revision to the NCP added language to broaden the technology, to include computer...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear Power Plant Safeguards Contingency Plans C Appendix C to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND... sabotage relating to special nuclear material or nuclear facilities licensed under the Atomic Energy Act of...
40 CFR 267.57 - What must the emergency coordinator do after an emergency?
Code of Federal Regulations, 2014 CFR
2014-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.57 What must the..., or any other material that results from a release, fire, or explosion at the facility. (b) The... completed. (2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended...
40 CFR 267.57 - What must the emergency coordinator do after an emergency?
Code of Federal Regulations, 2012 CFR
2012-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.57 What must the..., or any other material that results from a release, fire, or explosion at the facility. (b) The... completed. (2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended...
40 CFR 267.57 - What must the emergency coordinator do after an emergency?
Code of Federal Regulations, 2013 CFR
2013-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.57 What must the..., or any other material that results from a release, fire, or explosion at the facility. (b) The... completed. (2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended...
40 CFR 267.57 - What must the emergency coordinator do after an emergency?
Code of Federal Regulations, 2011 CFR
2011-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.57 What must the..., or any other material that results from a release, fire, or explosion at the facility. (b) The... completed. (2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... INFORMATION: List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... and Hazardous Substances Pollution Contingency Plan; National Priorities List AGENCY: Environmental... INFORMATION: List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... and Hazardous Substances Pollution Contingency Plan; National Priorities List AGENCY: Environmental... INFORMATION: List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control, Chemicals... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601...
75 FR 59975 - National Priorities List, Final Rule No. 50
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... Substances Pollution Contingency Plan (``NCP'') include a list of national priorities among the known... Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...
77 FR 57546 - National Priorities List, Proposed Rule No. 57
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-18
... the National Oil and Hazardous Substances Pollution Contingency Plan (``NCP'') include a list of... preparing my comments? H. May I submit comments after the public comment period is over? I. May I view... Contingency Plan (``NCP''), 40 CFR Part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
...'s liquidity needs beyond 90 days; and Strengthen each bank's Contingency Funding Plan (CFP). II... more focused policies concerning liquidity management and the contingency funding plan; (3) Divide the... comprehensive revisions. In this context, all commenters expressed the view that the proposed rule is excessive...
75 FR 9843 - National Priorities List, Proposed Rule No. 52
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
..., requires that the National Oil and Hazardous Substances Pollution Contingency Plan (``NCP'') include a list... Submit Comments After the Public Comment Period Is Over? I. May I View Public Comments Submitted by... Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105...
76 FR 57662 - National Priorities List, Final Rule No. 52
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Substances Pollution Contingency Plan (``NCP'') include a list of national priorities among the known... Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...
Implementation of 1978-1979 Contingency Plans. Reports 1, 3 & 4.
ERIC Educational Resources Information Center
Los Angeles Community Coll. District, CA.
Three reports are presented that address the problem of implementing 1978-79 contingency plans developed by the Los Angeles Community College District in response to a June 1978 property tax reduction initiative, Proposition 13. Report No. 1 provides an overview of district problems resulting from the tax limitation measure. Fiscal and educational…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Chemical Hazard Response Information System (CHRIS) is designed to provide timely information essential for proper decision-making by responsible Coast Guard personnel and others during emergencies involving the water transport of hazardous chemicals. A secondary purpose is the provision of certain basic non-emergency-related information to support the Coast Guard in its efforts to achieve improved levels of safety in the bulk shipment of hazardous chemicals. CHRIS consists of four reference guides or manuals, a regional contingency plan, a hazard-assessment computer system (HACS), and an organizational entity located at Coast Guard headquarters. The four manuals contain chemical data, hazard-assessment methods, andmore » response guides. Regional data for the entire coastline are included in the Coastal Regional Contingency Plans. The headquarters staff operates the hazard-assessment computer system and provides technical assistance on request by field personnel during emergencies. In addition, it is responsible for periodic update and maintenance of CHRIS. A brief description of each component of CHRIS and its relation to this manual - the Hazard-Assessment Handbook - is provided.« less
Joint Force Quarterly. Number 5, Summer 1994
1994-07-01
terms of a matrix and have set it up to achieve things that matrix organizations facilitate. Matrices compel interaction across organizations; they...provide more joint, synergistic solutions to military problems. One primary result of this interaction between the assess- ment process and JROC is the...the Contingency Tactical Air Control Auto- mated Planning System (CTAPS) are both single-host computer sys- tems that do not support interactive data
Joint Forces Command - United Assistance Fiscal Triad
2016-05-17
Division G–8, the 922nd Contracting Battalion (CBN), and C Detachment, 101st Financial Management Support Unit (C/101st FMSU) all deployed from Fort...Campbell, Kentucky, to resource OUA. This “fiscal triad” of resource management , contingency contracting, and financial operations units funded...of De- fense (DOD) operations to come in under budget , under the anticipated time, and with less manpower than initially requested. Planning and
40 CFR 267.55 - What is the role of the emergency coordinator?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What is the role of the emergency... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.55 What is the role of the emergency... familiar with all aspects of the facility's contingency plan, all operations and activities at the facility...
1986-08-01
victims of some of the most vicious terrorist acts occurring in the past year, airport security has come under increasing scrutiny by television...operations and contingency planning can be the weapons which airport security managers use to successfully battle the increasing trend of terrorist acts on airports today. (Author)
14 CFR 259.6 - Notice and contract of carriage.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...
ERIC Educational Resources Information Center
Huang, Jie-Tsuen
2011-01-01
The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... Ozone Standard in Lake and Porter Counties? 4. What Is the Contingency Plan for Lake and Porter Counties... your concerns, and suggest alternatives. 7. Explain your views as clearly as possible, avoiding the use... CAA as contingencies for areas not making Reasonable Further Progress (RFP) toward attainment of the...
14 CFR 259.6 - Notice and Contract of Carriage.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...
14 CFR 431.37 - Mission readiness.
Code of Federal Regulations, 2014 CFR
2014-01-01
... contingency abort plans and procedures, if any, as required under § 431.39; (vi) Unresolved safety issues.... (2) Procedures that ensure mission constraints, rules, contingency abort and emergency abort...
14 CFR 431.37 - Mission readiness.
Code of Federal Regulations, 2012 CFR
2012-01-01
... contingency abort plans and procedures, if any, as required under § 431.39; (vi) Unresolved safety issues.... (2) Procedures that ensure mission constraints, rules, contingency abort and emergency abort...
14 CFR 431.37 - Mission readiness.
Code of Federal Regulations, 2013 CFR
2013-01-01
... contingency abort plans and procedures, if any, as required under § 431.39; (vi) Unresolved safety issues.... (2) Procedures that ensure mission constraints, rules, contingency abort and emergency abort...
14 CFR 431.37 - Mission readiness.
Code of Federal Regulations, 2011 CFR
2011-01-01
... contingency abort plans and procedures, if any, as required under § 431.39; (vi) Unresolved safety issues.... (2) Procedures that ensure mission constraints, rules, contingency abort and emergency abort...
14 CFR 431.37 - Mission readiness.
Code of Federal Regulations, 2010 CFR
2010-01-01
... contingency abort plans and procedures, if any, as required under § 431.39; (vi) Unresolved safety issues.... (2) Procedures that ensure mission constraints, rules, contingency abort and emergency abort...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... Control District and the California Air Resources Board. Finally, it is disapproving the SIP's contingency... that SIP revision on July 29, 2011. EPA also proposed to disapprove the contingency measures provisions... also today disapproving the SIP's contingency measure provisions because they do not provide sufficient...
Meredith, Steven E.; Grabinski, Michael J.; Dallery, Jesse
2011-01-01
Background In contingency management (CM) interventions, monetary consequences are contingent on evidence of drug abstinence. Typically, these consequences are contingent on individual performance. Consequences contingent on group performance may promote social support (e.g., praise). Methods Thus, to combine social support with the monetary incentives of CM, we integrated independent and interdependent group contingencies of reinforcement into an Internet-based intervention to promote smoking abstinence. Breath carbon monoxide (CO) measures were compared between treatment conditions and a baseline control condition. Thirteen participants were divided into 5 groups or “teams” (n = 2–3 per team). Each participant submitted video recordings of CO measurement twice daily via the Internet. Teammates could monitor each other’s progress and communicate with one another through an online peer support forum. During a 4-day tapering condition, vouchers exchangeable for goods were contingent on gradual reductions in breath CO. During a 10-day abstinence induction condition, vouchers were contingent on abstinence (CO ≤4 ppm). In both treatment conditions, concurrent independent and interdependent group contingencies were arranged (i.e., a mixed contingency arrangement). Results Less than 1% of CO samples submitted during baseline were ≤4 ppm, compared to 57% submitted during abstinence induction. Sixty-five percent of participants’ comments on the online peer support forum were rated as positive by independent observers. Participants rated the intervention favorably on a treatment acceptability questionnaire. Conclusion The results suggest that the intervention is feasible and acceptable for promoting abstinence from cigarette smoking. PMID:21414733
NASA Technical Reports Server (NTRS)
1974-01-01
Future operational concepts for the space transportation system were studied in terms of space shuttle upper stage failure contingencies possible during deployment, retrieval, or space servicing of automated satellite programs. Problems anticipated during mission planning were isolated using a modified 'fault tree' technique, normally used in safety analyses. A comprehensive space servicing hazard analysis is presented which classifies possible failure modes under the catagories of catastrophic collision, failure to rendezvous and dock, servicing failure, and failure to undock. The failure contingencies defined are to be taken into account during design of the upper stage.
ERIC Educational Resources Information Center
Wright, Robert A.; McCurdy, Barry L.
2012-01-01
The Good Behavior Game (GBG) is a powerful group contingency with a history of documented empirical support. The purpose of this study was to compare two interdependent group contingencies, the GBG and a positive variation, the Caught Being Good Game (CBGG), in a school implementing school-wide positive behavior support. A kindergarten and…
1993-12-01
action to support humanitarian relief and democratic movements " (Towell, 1992, p. 3761). The U.S. 2 led coalition, from December 1992 through May...similar to planning and executing the movement phase of wartime contingencies. Therefore, these activities in humanitarian relief missions also serve...DISASTZR _ CATUGORIZS ORIGINS ZXARPLUS NATURAL METEOROLOGICAL STORMS, DROUGHTS TOPOLOGICAL FLOODS, LANDSLIDES TELLURIC /TECTONIC EARTHQUAKES BIOLOGICAL
Major Joint/Combined Operations
2008-01-01
Quarterly 3 (Winter 1993–1994), 74. 20 Andrew G. B. Vallance , The Air Weapon: Doctrines of Air Power Strategy and Operational Art (New York: St... Vallance , 94; and Donald L. McSwain, Air Campaign Planning for Contingency Operations (Maxwell Air Force Base, AL: Air War College, May 1989), 37. 23...require positive identification of friendly forces and positive control of aircraft. 36 Richard R. Muller, “Close Air Support: The German, British
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... contingency measures [section 172(c)(9)] and a major stationary source fee provision [sections 182(d)(3) and... Under Subpart 1: Revision to the Anti- backsliding Provisions to Address 1-Hour Contingency Measure... contingency measures. While BCCA claims that its comment was prompted by EPA's May 14 Rulemaking, that...
2010-01-01
strategic partnerships, national security planning (and theater security cooperation) and US Africa Command (AFRICOM) in securing long term access to...A potential constraint on the supply of strategic minerals is the lack of a US industrial policy and contingency plans in case the flow of... planning for various contingencies, particularly for the 2020s and beyond. The region contains high concentrations of platinum group metals (PGMs
The Earth Science Afternoon Constellation Contingency Procedures
NASA Technical Reports Server (NTRS)
Case, Warren F.; Richon, Karen
2005-01-01
The Earth Science Afternoon Constellation comprises NASA missions Aqua, Aura, CloudSat and the Orbiting Carbon Observatory (OCO), the joint NASA/CNES mission CALIPSO and the CNES mission PARASOL. Both NASA and CNES offices are responsible for ensuring that contingency plans or other arrangements exist to cope with contingencies within their respective jurisdictions until the conclusion of all Afternoon Constellation operations. The Mission Operations Working Group, comprised of members from each of the missions, has developed the high-level procedures for maintaining the safety of this constellation. Each contingency situation requires detailed analyses before any decisions are made. This paper describes these procedures, and includes defining what constitutes a contingency situation, the pertinent parameters involved in the contingency analysis and guidelines for the actions required, based on the results of the contingency analyses.
Disaster recovery plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support formore » the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.« less
Psychological intervention in the Spanish military deployed on international operations.
Martínez-Sánchez, Juan A
2014-05-01
Spain was one of the first countries to recognize the importance of psychological aspects in the planning and development of international military operations, and also to include military psychologists in contingents deployed abroad. This paper describes the psychological intervention model used by Spanish military psychologists involved in military operations abroad. This model is comprised of a systematic set of interventions and actions carried out in the different phases of any military operation (concentration, deployment and post-mission). It also contemplates the intervention not only in personnel who integrate the military contingents, but also with their families and, at certain times of the mission, with the local population of the area in which the operation is carried out. The model presented has a preventive orientation, based on the selection and psychological preparation of contingents before deployment, and supplemented by support in the area of operations for personnel who need it, and the psychological care of their families in Spain. Whereas this model has been effective so far, in this work, we present a series of measures aimed at improving the psychological well-being of our troops deployed outside our country.
Overview of medical operations for a manned stratospheric balloon flight.
Blue, Rebecca S; Law, Jennifer; Norton, Sean C; Garbino, Alejandro; Pattarini, James M; Turney, Matthew W; Clark, Jonathan B
2013-03-01
Red Bull Stratos was a commercial program designed to bring a test parachutist protected by a full-pressure suit via a stratospheric balloon with a pressurized capsule to 120,000 ft (36,576 m), from which he would freefall and subsequently parachute to the ground. On March 15, 2012, the Red Bull Stratos program successfully conducted a preliminary manned balloon test flight and parachute jump, reaching a final altitude of 71,581 ft (21,818 m). In light of the uniqueness of the operation and medical threats faced, a comprehensive medical plan was needed to ensure prompt and efficient response to any medical contingencies. This report will serve to discuss the medical plans put into place before the first manned balloon flight and the actions of the medical team during that flight. The medical operations developed for this program will be systematically evaluated, particularly, specific recommendations for improvement in future high-altitude and commercial space activities. A multipronged approach to medical support was developed, consisting of event planning, medical personnel, equipment, contingency-specific considerations, and communications. Medical operations were found to be highly successful when field-tested during this stratospheric flight, and the experience allowed for refinement of medical operations for future flights. The lessons learned and practices established for this program can easily be used to tailor a plan specific to other aviation or spaceflight events.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
...EPA is proposing to approve a state implementation plan (SIP) revision submitted by the State of California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual and 24-hour fine particulate matter (PM2.5) national ambient air quality standards in the San Joaquin Valley. Final approval of this SIP revision would terminate the sanctions clocks and a federal implementation plan clock that were triggered by EPA's partial disapproval of a related SIP submission on November 9, 2011 (76 FR 69896).
Bernath, Katrin; Roschewitz, Anna
2008-11-01
The extension of contingent valuation models with an attitude-behavior based framework has been proposed in order to improve the descriptive and predictive ability of the models. This study examines the potential of the theory of planned behavior to explain willingness to pay (WTP) in a contingent valuation survey of the recreational benefits of the Zurich city forests. Two aspects of WTP responses, protest votes and bid levels, were analyzed separately. In both steps, models with and without the psychological predictors proposed by the theory of planned behavior were compared. Whereas the inclusion of the psychological predictors significantly improved explanations of protest votes, their ability to improve the performance of the model explaining bid levels was limited. The results indicate that the interpretation of bid levels as behavioral intention may not be appropriate and that the potential of the theory of planned behavior to improve contingent valuation models depends on which aspect of WTP responses is examined.
A fit for purpose training programme for the decontamination of personnel.
O'Mara, E; Cole, P; Wynn, A; Collison, R
2015-06-01
Contingency plans are a crucial part of operating any nuclear facility. The success of a contingency plan depends on the efficacy of the plan and the confidence and understanding of those who must enact it. This project focused on both of these aspects, clarifying technique and then designing and delivering a training programme for decontamination. The design of the training was based on the IAEA Systematic Approach to Training (SAT). The delivery focused on ways of increasing retention including use of practical examples and assessment, peer assessment and visual contingency plans. A quantitative survey of the trainees was conducted using a questionnaire before and after the training programme delivery. The results clearly demonstrate an improvement across all elements of skills and knowledge required to undertake decontamination. Effective training is fundamental to the development of a good safety culture and the methodology used in this work has led to a clear improvement in radiation protection culture at the Devonport site.
Friend, M.; Franson, J.C.
1999-01-01
Individual disease outbreaks have killed many thousands of animals on numerous occasions. Tens of thousands of migratory birds have died in single die-offs with as many as 1,000 birds succumbing in 1 day. The ability to successfully combat such explosive situations is highly dependent on the readiness of field personnel to deal with them. Because many disease agents can spread through wildlife populations very quickly, advance preparation is essential for preventing infected animals from spreading disease to additional species and locations. Carefully thought-out disease contingency plans should be developed as practical working documents for field personnel and updated as necessary. Well-designed plans can prove invaluable in minimizing wildlife losses and the costs associated with disease control activities.Although requirements for disease control operations vary and must be tailored to each situation, all disease contingency planning involves general concepts and basic biological information. This chapter, which is intended to be a practical guide, identifies the major activities and needs of disease control operations, and relates them to disease contingency planning.
ERIC Educational Resources Information Center
Brown, Kenneth E.; Mirenda, Pat
2006-01-01
This study evaluated the effectiveness of contingency mapping, a new visual support strategy designed to enhance clients' understanding of the contingencies associated with functional equivalence training (FET). The study was conducted in a general education classroom with an adolescent boy with autism who engaged in prompt dependent behavior. A…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-14
... Martin Dam Project: (1) A flood control guide; (2) an operating guide; and (3) a drought contingency.... The drought contingency plan provides an indication of impending hydrologic drought conditions. m. A...
Expected Utility Distributions for Flexible, Contingent Execution
NASA Technical Reports Server (NTRS)
Bresina, John L.; Washington, Richard
2000-01-01
This paper presents a method for using expected utility distributions in the execution of flexible, contingent plans. A utility distribution maps the possible start times of an action to the expected utility of the plan suffix starting with that action. The contingent plan encodes a tree of possible courses of action and includes flexible temporal constraints and resource constraints. When execution reaches a branch point, the eligible option with the highest expected utility at that point in time is selected. The utility distributions make this selection sensitive to the runtime context, yet still efficient. Our approach uses predictions of action duration uncertainty as well as expectations of resource usage and availability to determine when an action can execute and with what probability. Execution windows and probabilities inevitably change as execution proceeds, but such changes do not invalidate the cached utility distributions, thus, dynamic updating of utility information is minimized.
Real-time contingency handling in MAESTRO
NASA Technical Reports Server (NTRS)
Britt, Daniel L.; Geoffroy, Amy L.
1992-01-01
A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.
Contingency Analysis Post-Processing With Advanced Computing and Visualization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin
Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability andmore » accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.« less
Contingency Teaching during Close Reading
ERIC Educational Resources Information Center
Fisher, Douglas; Frey, Nancy
2015-01-01
12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.
1995-12-01
Contingency Plan ............................... 10 Table 2: Summary of Inhalation Emission Factors (K) for Equation ( 1 ...surveys for exposure factors commonly used in risk assessment (EPA, 1989a: 1 - 1 ). Exposure can take place via three possible routes, the inhalation ...Equation ( 1 ) calculates the dose for the inhalation route (USEPA, 1991 a:51-52; USEPA, 1989b:6-44). Dose - (C)(IRXETXEFXED) (K)(BWXAT) where C
2015-12-01
sub- functions: 20 • A.1 – Receive Warning Order • A.2 – Determine Available Transportation • A.3 – Allocate Equipment and Personnel Functions A...upon the Warning Order and allocate personnel and equipment to those transportation assets. Figure 6 depicts functional hierarchy of the Planning...determine available shipping and the allocation of equipment (e.g., cargo and vehicle capacities) to the available ships. In support of MEB
Wilkinson, Meredith R; Ball, Linden J; Alford, David
2015-01-01
We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.
Wilkinson, Meredith R.; Ball, Linden J.; Alford, David
2015-01-01
We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Planning and coordination structure... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a... assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Planning and coordination structure... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a... assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Planning and coordination structure... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a... assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Planning and coordination structure... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a... assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
1983-12-01
ENGINEERS WALTHAM MR NEWl INLSIID2GSRDDVDEC 83 F/G 13/2 U mEEmhhhohhhmhI MIRO OP RE OAV IS H R L -I- I~JDrought Contingency US Army Corps of Engineers Plan...LA.KE WA’ N, t:ehauc River, 3c,,thhr:Aee ino t irhrid. Massacnusetts -RAIN.A\\, ; AREA 4Q. quare miles ;ro-s’ 322 . saire miles ,net’ sT,’k.,; "’:Es 7lood
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... Inventory, Reasonably Available Control Measures, Contingency Measures, and Transportation Conformity... emissions inventory, contingency measures, and the reasonably available control measure (RACM) analysis... Resources & Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903. FOR FURTHER...
Code of Federal Regulations, 2012 CFR
2012-07-01
... complies with the “National Contingency Plan” (NCP) and the statutory requirements of CERCLA. Federal... include in-kind as well as cash contributions. National Contingency Plan (NCP) means the federal government's blueprint for responding to both oil spills and hazardous substance releases. It lays out the...
Task Force On Contractor Logistics in Support of Contingency Operations
2014-06-01
existing industrial base providing support services to deployed military forces should be integrated into all contingency war games and exercises...implementation of OCS in active operations has been a constant game of catch up for more than a decade. Poor contract administration, inconsistent...military forces should be integrated into all contingency war games and exercises. Equally important is including representatives from the agencies
A Retrospective on Educational Planning in Comparative Education.
ERIC Educational Resources Information Center
Farrell, Joseph P.
1997-01-01
Defines and broadly traces the history of educational planning in both developing and industrialized capitalist nations. Discusses general approaches to educational planning (technical versus political planning, top-down versus bottom-up planning, and various theoretical bases); the contingency view of planning; case examples of planned,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... requirements similar to those previously imposed by Commission orders issued after the terrorist attacks of... Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Cyber Security Plan...
Collective Intelligence and Three Aspects of Planning in Organizations: A NASA Example
NASA Technical Reports Server (NTRS)
Billman, Dorrit; Feary, Michael
2010-01-01
For many complex sociotechnical systems, planning seems to require explicit coordination; certainly, in executing a plan the activities of different actors must be tightly coupled. However, distributing the needed planning information can be very burdensome and error prone, because different groups need different collections of information, updated or kept current on different time cycles. Further, the information needed to form successful plans is often highly distributed, and while feedback about the success of prior plans may exist, it may not be available to those in a position of using this to improve plans or to detect and resolve other problems in the system (Weick, 1995). Tools to support various aspects of planning have been developed, and can provide a huge benefit to the individuals working on that aspect. To be tractable, most solutions address a quite bounded slice of work, isolating it from the larger context. Prospective planning takes place over multiple, nested cycles of decision making. This builds a plan that specifies activities of different granularity. "Subplans" may specify multiple parallel activities by different groups and individuals, as well as sequential, nested actions by a single actor. Planning produces valuable, sharable, external, representations: in addition to prospective use, plans support retrospective assessment and also action in the present. Viewing planning in a larger context - both temporal and organizational -- enables noticing what one does not know and generating more systemic and effective solutions. Viewing a problem as one of collective intelligence invites thinking about the larger organizational context. Many approaches to supporting collective intelligence do not support execution of highly contingent actions, distributed across many players, and hence provide incomplete support for planning. However, CI technology maybe helpful in managing the processes of gathering information for decision making in planning and of distributing plan information to various actors, needed on various time cycles.
Koenen, F; Uttenthal, A; Meindl-Böhmer, A
2007-12-01
In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.
A systematic approach to very important person preparedness for a trauma center.
Bulson, Julie; Mattice, Connie; Bulson, Timothy
2012-01-01
Hospitals across the United States are more involved in disaster/rapid response planning than ever. This collaboration is often driven by continuing federal and state preparedness and all-hazards planning efforts that provide cooperative agreement and/or grant support. These efforts currently include programs administered by the US assistant secretary for preparedness and response, the US Centers for Disease Control and Prevention, the US Department of Defense, and the US Department of Homeland Security. Beyond legislated support or mandates, key emergency management regulations governing hospital-specific disaster planning and response activities are required of hospitals by The Joint Commission, the largest national hospital accrediting body. Despite this ongoing, heightened awareness and inclusion of health care in local and regional emergency response planning, there is 1 partnership to yet strengthen: the relationship between community trauma centers and US Secret Service staff responsible for White House travel and health care contingency plans. One Michigan hospital system designed a program that has made preevent communications and preparedness for rapid very important person response with the Secret Service as important as other local all-hazards planning; the evolution of this partnership is the focus of this article.
Hennessey, Morgan; Lee, Brendan; Goldsmith, Timothy; Halvorson, Dave; Hueston, William; McElroy, Kristina; Waters, Katherine
2010-03-01
Since 2006, a collaborative group of egg industry, state, federal, and academia representatives have worked to enhance preparedness in highly pathogenic avian influenza (HPAI) planning. The collaborative group has created a draft egg product movement protocol, which calls for realistic, science-based contingency plans, biosecurity assessments, commodity risk assessments, and real-time reverse transcriptase-PCR testing to support the continuity of egg operations while also preventing and eradicating an HPAI outbreak. The work done by this group serves as an example of how industry, government, and academia can work together to achieve better preparedness in the event of an animal health emergency. In addition, in the event of an HPAI outbreak in domestic poultry, U.S. consumers will be assured that their egg products come from healthy chickens.
NASA Technical Reports Server (NTRS)
Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert
2006-01-01
Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.
40 CFR 109.3 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., LOCAL AND REGIONAL OIL REMOVAL CONTINGENCY PLANS § 109.3 Purpose and scope. The guidelines in this part establish minimum criteria for the development and implementation of State, local, and regional contingency..., fish, shellfish, wildlife, and public and private property, shorelines, and beaches. The development...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... Emission Inventory, Contingency Measures, Reasonably Available Control Measures, and Transportation... inventory, RFP contingency measure, and reasonably available control measure (RACM) requirements of the...) associated with this revision. EPA is approving the SIP revision because it satisfies the emission inventory...
Investigating Group Contingencies to Promote Brief Abstinence from Cigarette Smoking
Meredith, Steven E.; Dallery, Jesse
2013-01-01
In contingency management (CM), monetary incentives are contingent on evidence of drug abstinence. Typically, incentives (e.g., “vouchers” exchangeable for goods or services) are contingent on individual performance. We programmed vouchers contingent on group performance to investigate whether these contingencies would promote brief abstinence from cigarette smoking. Thirty-two participants were divided into small teams (n = 3 per team). During three 5-day within-subject experimental conditions, participants submitted video recordings of breath carbon monoxide (CO) measures twice daily via Mōtiv8 Systems™, an Internet-based remote monitoring application. During the interdependent contingency condition, participants earned vouchers each time they and their teammates submitted breath CO samples indicative of abstinence (i.e., negative samples). During the independent contingency condition, participants earned vouchers each time they submitted negative samples, regardless of their teammates' performance. During the no vouchers condition, no monetary incentives were contingent on abstinence. In addition, half of the participants (n = 16) could communicate with their teammates through an online peer support forum. Although forum access did not appear to promote smoking abstinence, monetary incentives did promote brief abstinence. Significantly more negative samples were submitted when vouchers were contingent on individual performance (56%) or team performance (53%) relative to when no vouchers were available (35%; F = 6.9, p = 0.002). The results show that interdependent contingencies can promote brief abstinence from cigarette smoking. Moreover, the results suggest that these contingencies may help lower treatment costs and promote social support. PMID:23421358
Code of Federal Regulations, 2014 CFR
2014-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
A Reappraisal of Leadership Theory and Training.
ERIC Educational Resources Information Center
Owens, James
1981-01-01
Reviews and organizes modern leadership theories. Notes the research supporting the main thesis of contingency theory and that effective leadership style is contingent upon situational factors. Characteristics of management training based on the contingency approach are identified. (Author/MLF)
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
40 CFR 300.215 - Title III local emergency response plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...
Sample Return Primer and Handbook
NASA Technical Reports Server (NTRS)
Barrow, Kirk; Cheuvront, Allan; Faris, Grant; Hirst, Edward; Mainland, Nora; McGee, Michael; Szalai, Christine; Vellinga, Joseph; Wahl, Thomas; Williams, Kenneth;
2007-01-01
This three-part Sample Return Primer and Handbook provides a road map for conducting the terminal phase of a sample return mission. The main chapters describe element-by-element analyses and trade studies, as well as required operations plans, procedures, contingencies, interfaces, and corresponding documentation. Based on the experiences of the lead Stardust engineers, the topics include systems engineering (in particular range safety compliance), mission design and navigation, spacecraft hardware and entry, descent, and landing certification, flight and recovery operations, mission assurance and system safety, test and training, and the very important interactions with external support organizations (non-NASA tracking assets, landing site support, and science curation).
Tethered Satellite System Contingency Investigation Board
NASA Technical Reports Server (NTRS)
1992-01-01
The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether control mechanism and to prepare a detailed plan for hardware inspection, test, and analysis including any appropriate hardware disassembly.
Tethered Satellite System Contingency Investigation Board
NASA Astrophysics Data System (ADS)
1992-11-01
The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether control mechanism and to prepare a detailed plan for hardware inspection, test, and analysis including any appropriate hardware disassembly.
Contingency Management of Health Care Organizations: It Depends.
Olden, Peter C
Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2013 CFR
2013-01-01
... command and delegation of authority as these apply to safeguards contingencies. b. Physical Layout—(i..., up to and including the design basis threat of radiological sabotage. The goals of licensee... general description of how the response is organized. a. Perceived Danger—Consistent with the design basis...
Case 1; An Initial Study of Contingencies Applicable to Special Education.
ERIC Educational Resources Information Center
Cohen, Harold C.; And Others
The first CASE (Contingencies Applicable to Special Education) project, conducted from February to October 1965 with student inmates at the National Training School for Boys (NTSB), used environmental planning concepts and behavioral learning principles to restructure a basic education curriculum in terms of individual performance requirements,…
A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.
ERIC Educational Resources Information Center
Kim, Sang-Hoon; Lee, Jinjoo
1991-01-01
Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... reasonable further progress (RFP), reasonable available control measures, and contingency measures under... request. The General Preamble sets forth EPA's view of applicable requirements for purposes of evaluating...) contingency measures is not applicable for purposes of redesignation. Id. Section 172(c)(3) requires...
75 FR 9782 - National Priorities List, Final Rule No. 49
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... ``the Act''), as amended, requires that the National Oil and Hazardous Substances Pollution Contingency... Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180... ``Jones Co. plant site,'' does not imply that the Jones company is responsible for the contamination...
Code of Federal Regulations, 2014 CFR
2014-07-01
... such as basic marksmanship, patrolling, mission planning, medical, and survival. (vii) Other... circumstances. Planning and preparedness by the Federal Government, including DoD, for civil disturbances is.... 331-334. (v) Planning by the DoD Components for CDO shall be compatible with contingency plans for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... such as basic marksmanship, patrolling, mission planning, medical, and survival. (vii) Other... circumstances. Planning and preparedness by the Federal Government, including DoD, for civil disturbances is.... 331-334. (v) Planning by the DoD Components for CDO shall be compatible with contingency plans for...
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES... appropriate federal, state, and local officials to enhance the contingency planning of those officials and to assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
Ahmed, Adeel; Masud, Muhammad Mehedi; Al-Amin, Abul Quasem; Yahaya, Siti Rohani Binti; Rahman, Mahfuzur; Akhtar, Rulia
2015-06-01
This study empirically estimates farmers' willingness to pay (WTP) for a planned adaptation programme for addressing climate issues in Pakistan's agricultural sectors. The contingent valuation method (CVM) was employed to determine a monetary valuation of farmers' preferences for a planned adaptation programme by ascertaining the value attached to address climatic issues. The survey was conducted by distributing structured questionnaires among Pakistani farmers. The study found that 67 % of respondents were willing to pay for a planned adaptation programme. However, several socioeconomic and motivational factors exert greater influence on their willingness to pay (WTP). This paper specifies the steps needed for all institutional bodies to better address issues in climate change. The outcomes of this paper will support attempts by policy makers to design an efficient adaptation framework for mitigating and adapting to the adverse impacts of climate change.
An exploratory study of healthcare strategic planning in two metropolitan areas.
Begun, James W; Kaissi, Amer A
2005-01-01
Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.
NASA Contingency Shuttle Crew Support (CSCS) Medical Operations
NASA Technical Reports Server (NTRS)
Adams, Adrien
2010-01-01
The genesis of the space shuttle began in the 1930's when Eugene Sanger came up with the idea of a recyclable rocket plane that could carry a crew of people. The very first Shuttle to enter space was the Shuttle "Columbia" which launched on April 12 of 1981. Not only was "Columbia" the first Shuttle to be launched, but was also the first to utilize solid fuel rockets for U.S. manned flight. The primary objectives given to "Columbia" were to check out the overall Shuttle system, accomplish a safe ascent into orbit, and to return back to earth for a safe landing. Subsequent to its first flight Columbia flew 27 more missions but on February 1st, 2003 after a highly successful 16 day mission, the Columbia, STS-107 mission, ended in tragedy. With all Shuttle flight successes come failures such as the fatal in-flight accident of STS 107. As a result of the STS 107 accident, and other close-calls, the NASA Space Shuttle Program developed contingency procedures for a rescue mission by another Shuttle if an on-orbit repair was not possible. A rescue mission would be considered for a situation where a Shuttle and the crew were not in immediate danger, but, was unable to return to Earth or land safely. For Shuttle missions to the International Space Station (ISS), plans were developed so the Shuttle crew would remain on board ISS for an extended period of time until rescued by a "rescue" Shuttle. The damaged Shuttle would subsequently be de-orbited unmanned. During the period when the ISS Crew and Shuttle crew are on board simultaneously multiple issues would need to be worked including, but not limited to: crew diet, exercise, psychological support, workload, and ground contingency support
Prosthetic contingencies for future tooth loss.
Kaldahl, W B; Becker, C M
1985-01-01
Possible contingencies for future natural tooth loss that can and should be built into prostheses have been reviewed. These contingencies provide a measure of security to the patient and the dentist when attempting to maintain teeth that appear to have a guarded prognosis. Without a contingency these questionable teeth would be extracted early in therapy from fear that a completely new prosthesis would have to be made if they were lost at a later time. In maintaining more natural teeth, the patient has better function, more occlusal and vertical support, longer maintenance of the alveolar ridge, more support for the prosthesis, and more remaining teeth to share all the forces. This approach of building in contingencies for future tooth loss allows the patient and the dentist the freedom to attempt therapy on abutments with a guarded prognosis with little financial risk.
Friend, Milton; Franson, J. Christian
1987-01-01
Individual disease outbreaks have killed many thousands of animals on numerous occasions. Tens of thousands of migratory birds have died in single die-offs with as many as 1,000 birds succumbing in 1 day. In mammals, individual disease outbreaks have killed hundreds to thousands of animals with, for example, hemorrhagic disease in white-tailed deer, distemper in raccoon, Errington's disease in muskrat, and sylvatic plague in wild rodents. The ability to successfully combat such explosive situations is highly dependent n the readiness of field personnel to deal with them. Because many disease agents can spread though wildlife populations very fast, advance preparation is essential in preventing infected animals from spreading disease to additional species and locations. Carefully though-out disease contingency plans should be developed as practical working documents for field personnel and updated as necessary. Such well-designed plans can prove invaluable in minimizing wildlife losses and costs associated with disease control activities. Although requirements for disease control operations vary and must be tailored to each situation, all disease contingency planning involved general concepts and basic biological information. This chapter, intended as a practical guide, identifies the major activities and needs of disease control operations, and relates them to disease contingency planning.
Menon, Anil S; Jourdan, David; Nusbaum, Derek M; Garbino, Alejandro; Buckland, Daniel M; Norton, Sean; Clark, Johnathan B; Antonsen, Erik L
2016-10-01
The StratEx program used a self-contained space suit and balloon system to loft pilot Alan Eustace to a record-breaking altitude and skydive from 135,897 feet (41,422 m). After releasing from the balloon and a stabilized freefall, the pilot safely landed using a parachute system based on a modified tandem parachute rig. A custom spacesuit provided life support using a similar system to NASA's (National Aeronautics and Space Administration; Washington, DC USA) Extravehicular Mobility Unit. It also provided tracking, communications, and connection to the parachute system. A recovery support team, including at least two medical personnel and two spacesuit technicians, was charged with reaching the pilot within five minutes of touchdown to extract him from the suit and provide treatment for any injuries. The team had to track the flight at all times, be prepared to respond in case of premature release, and to operate in any terrain. Crew recovery operations were planned and tailored to anticipate outcomes during this novel event in a systematic fashion, through scenario and risk analysis, in order to minimize the probability and impact of injury. This analysis, detailed here, helped the team configure recovery assets, refine navigation and tracking systems, develop procedures, and conduct training. An extensive period of testing and practice culminated in three manned flights leading to a successful mission and setting the record for exit altitude, distance of fall with stabilizing device, and vertical speed with a stabilizing device. During this mission, recovery teams reached the landing spot within one minute, extracted the pilot, and confirmed that he was not injured. This strategy is presented as an approach to prehospital planning and care for improved safety during crew recovery in novel, extreme events. Menon AS , Jourdan D , Nusbaum DM , Garbino A , Buckland DM , Norton S , Clark JB , Antonsen EL . Crew recovery and contingency planning for a manned stratospheric balloon flight - the StratEx program. Prehosp Disaster Med. 2016;31(5):524-531.
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2012 CFR
2012-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2013 CFR
2013-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2014 CFR
2014-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2011 CFR
2011-01-01
... command and delegation of authority as these apply to safeguards contingencies. b. Physical Layout—(i..., up to and including the design basis threat of radiological sabotage. The goals of licensee.... Perceived Danger—Consistent with the design basis threat specified in § 73.1(a)(1), licensees shall identify...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
.... Id. \\7\\ Consistent with EPA's definition of ``design value'' in 40 CFR 58.1, we use the term ``design... evaluations below. Carl Moyer Memorial Air Quality Standards Attainment Program The Contingency Measures SIP identifies a portion of the Carl Moyer Memorial Air Quality Standards Attainment Program (Carl Moyer Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... reasonable further progress (RFP), RACM, and contingency measures under section 172(c)(9). The General... EPA's view of applicable requirements for purposes of evaluating redesignation requests when an area... subject to an RFP requirement, the requirement to submit the section 172(c)(9) contingency measures is not...
14 CFR 259.4 - Contingency plan for lengthy tarmac delays.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...
Nursing's role in Y2K planning.
Simpson, R L
1999-04-01
Why haven't more nurses fulfilled their role in Y2K planning? Nurses need to apply their skills and expertise to solving often overlooked problems such as point-of-service applications, transactions with business partners, and contingency planning.
Planning for School Emergencies.
ERIC Educational Resources Information Center
Della-Giustina, Daniel E.
This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Promulgation of Implementation Plans; New York Reasonable Further Progress Plans, Emissions Inventories, Contingency Measures and Motor Vehicle Emissions Budgets AGENCY: Environmental Protection Agency (EPA). ACTION... year and 2008 projection year emissions inventories, the 2008 motor vehicle emissions budgets used for...
Li, Zheng-Ling; Chen, Ming-Yong; Wu, Zhao-Lu; Wang, Qian; Dong, Yong-Hua
2009-06-01
By using contingent valuation method (CVM), an investigation was made from November 2007 to March 2008 on the perception and attitude of 196 households in 5 villages within 2 planned Asian elephant conservation corridors in Xishuangbanna to the construction of the corridors. 80.61% of the interviewees conditionally supported the corridors construction. The main factors affecting the interviewees' support willingness included their education level, per capita income, and perceptions to Asian elephant protection, human-elephant relations, and corridor utilization patterns and its beneficiaries, among which, the interviewees' awareness of Asian elephant conservation, corridor utilization patterns, and corridor beneficiaries had strong influence on the support willingness, with the correlation coefficient being 0.231, 0.236, and -0.304, respectively. The rural community holding the land tenure played a key role in the corridors construction. To effectively design and planning the construction of biological conservation corridor, it is necessary to have a deep understanding on the perceptions and attitudes of rural community to the construction of the corridor and to obtain their support and participation for this construction.
Contingency Planning for the Microwave Anisotropy Probe Mission
NASA Technical Reports Server (NTRS)
Mesarch, Michael A.; Rohrbaugh, David; Schiff, Conrad; Bauer, Frank (Technical Monitor)
2002-01-01
The Microwave Anisotropy Probe (MAP) utilized a phasing loop/lunar encounter strategy to achieve a small amplitude Lissajous orbit about the Sun-Earth/Moon L2 libration point. The use of phasing loops was key in minimizing MAP's overall deltaV needs while also providing ample opportunities for contingency resolution. This paper will discuss the different contingencies and responses studied for MAP. These contingencies included accommodating excessive launch vehicle errors (beyond 3 sigma), splitting perigee maneuvers to achieve ground station coverage through the Deep Space Network (DSN), delaying the start of a perigee maneuver, aborting a perigee maneuver in the middle of execution, missing a perigee maneuver altogether, and missing the lunar encounter (crucial to achieving the final Lissajous orbit). It is determined that using a phasing loop approach permits many opportunities to correct for a majority of these contingencies.
NASA Technical Reports Server (NTRS)
Prokhorov, Kimberlee; Shkedi, Brienne
2006-01-01
The current International Space Station (ISS) Environmental Control and Life Support (ECLS) system is designed to support an ISS crew size of three people. The capability to expand that system to support nine crew members during a Contingency Shuttle Crew Support (CSCS) scenario has been evaluated. This paper describes how the ISS ECLS systems may be operated for supporting CSCS, and the durations expected for the oxygen supply and carbon dioxide control subsystems.
40 CFR 52.2170 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
.../13/2006 72 FR 57864; 10/11/2007 74:36:03:02 Episode emergency contingency plan 6/13/2006 72 FR 57864... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan. 52.2170 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Dakota § 52.2170 Identification of plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... Cabell and Wayne Counties in their entireties and a portion of Mason County (Graham Tax District) in West... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S...
Single- and Dual-Process Models of Biased Contingency Detection.
Vadillo, Miguel A; Blanco, Fernando; Yarritu, Ion; Matute, Helena
2016-01-01
Decades of research in causal and contingency learning show that people's estimations of the degree of contingency between two events are easily biased by the relative probabilities of those two events. If two events co-occur frequently, then people tend to overestimate the strength of the contingency between them. Traditionally, these biases have been explained in terms of relatively simple single-process models of learning and reasoning. However, more recently some authors have found that these biases do not appear in all dependent variables and have proposed dual-process models to explain these dissociations between variables. In the present paper we review the evidence for dissociations supporting dual-process models and we point out important shortcomings of this literature. Some dissociations seem to be difficult to replicate or poorly generalizable and others can be attributed to methodological artifacts. Overall, we conclude that support for dual-process models of biased contingency detection is scarce and inconclusive.
Optimizing Flexibility and Responsiveness in U.S. Army Contingency Plan Logistical Support
1984-03-01
OCONUS supplies are t- made available on a per day basis, it can be seen that when OCONUS is allowed, the high priority requests, being at the top cf ...1983). 121 39. Wilmot , Chester. "World War II", University So&ity Encyclopedia, Volume 19. New Jersey:Lexicon Publications, Inc., 1977. 40. Works, LTC...variables XX(2) throuqh XX(7) tre asa.J follows. C c XX(2) - initial inventory level cf class V itvms ir. CONUS c XX(3) - initial inventory level of
Advertising the University: A Professional Approach to Promoting the College or University.
ERIC Educational Resources Information Center
Jugenheimer, Donald W.
1995-01-01
Colleges and universities generally advertise themselves poorly because of improper planning, resistance, inexperience, and lack of marketing plan. Components of effective advertising include an appropriate and strategic plan, correct choice of planner, coordination with other marketing efforts, contingency planning, and follow-up activities. (MSE)
75 FR 10328 - Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... Plan, Safeguards Contingency Plan, and Cyber Security Plan referred to collectively hereafter as... its security plans. Pursuant to 10 CFR 51.32, ``Finding of no significant impact,'' the Commission has... by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55...
Collaborative Planning in Process: An Ethnomethodological Perspective
ERIC Educational Resources Information Center
Lee, Josephine; Burch, Alfred Rue
2017-01-01
Following Ellis's (2005) call for more social and process-oriented planning research, this study explores how learners approach collaborative planning tasks in the classroom as a locally contingent activity in situ. Drawing on ethnomethodology and conversation analysis, the present study focuses on a group planning stage that precedes the final…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... computed 3-year average ozone concentration of 0.085 ppm is the smallest value that is greater than 0.08..., April 30, 1992; 3. ``Contingency Measures for Ozone and Carbon Monoxide (CO) Redesignations... includes contingency measures to remedy future violations of the 1997 8-hour ozone NAAQS. The maintenance...
Chemical Emergency Preparedness and Prevention on Tribal Lands
This fact sheet familiarizes tribal leaders with EPCRA and Chemical Accident Prevention Program requirements. Tribal Emergency Response Commissions (TERCs) can appoint LEPCs, develop contingency plans, and review facilities' Risk Management Plans.
14 CFR 431.25 - Application requirements for policy review.
Code of Federal Regulations, 2011 CFR
2011-01-01
... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...
14 CFR 431.25 - Application requirements for policy review.
Code of Federal Regulations, 2012 CFR
2012-01-01
... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...
14 CFR 431.25 - Application requirements for policy review.
Code of Federal Regulations, 2013 CFR
2013-01-01
... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...
14 CFR 431.25 - Application requirements for policy review.
Code of Federal Regulations, 2014 CFR
2014-01-01
... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...
Contingency Contracting and Operant Behavior Change: An Exercise in Applied Behavior Analysis.
ERIC Educational Resources Information Center
Mann, Ronald A.
Until recently, the use of contingency contracting has been largely an issue of theory and discussion with little experimental research evidence gathered to support efficacy. Two major reasons for this problem are suggested and discussed: (1) the concept of contingency contracting has not been adequately defined nor its minimal requirements…
Code of Federal Regulations, 2013 CFR
2013-04-01
... reduce funding balances. (b) Limitation on shutdown benefits and other unpredictable contingent event... effect. (6) Treatment of mergers, consolidations, and transfers of plan assets into a plan. [Reserved] (d... accruals for plans with severe funding shortfalls. (1) In general. (2) Exemption if section 436...
Code of Federal Regulations, 2010 CFR
2010-04-01
... reduce funding balances. (b) Limitation on shutdown benefits and other unpredictable contingent event... effect. (6) Treatment of mergers, consolidations, and transfers of plan assets into a plan. [Reserved] (d... accruals for plans with severe funding shortfalls. (1) In general. (2) Exemption if section 436...
40 CFR 52.1640 - Original identification of plan section.
Code of Federal Regulations, 2011 CFR
2011-07-01
...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...
40 CFR 52.1640 - Original identification of plan section.
Code of Federal Regulations, 2014 CFR
2014-07-01
...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...
40 CFR 52.1640 - Original identification of plan section.
Code of Federal Regulations, 2012 CFR
2012-07-01
...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...
40 CFR 52.1640 - Original identification of plan section.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...
40 CFR 52.1640 - Original identification of plan section.
Code of Federal Regulations, 2013 CFR
2013-07-01
...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
...] Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
...] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
...] Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...
NASA Technical Reports Server (NTRS)
2005-01-01
This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).
Icek Ajzen; Thomas C. Brown; Franklin Carvajal
2004-01-01
An experiment was designed to account for intention-behavior discrepancies by applying the theory of planned behavior to contingent valuation. College students (N = 160) voted in hypothetical and real payment referenda to contribute $8 to a scholarship fund. Overestimates of willingness to pay in the hypothetical referendum could not be attributed to moderately...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
... your concerns, and suggest alternatives. 7. Explain your views as clearly as possible, avoiding the use... demonstration requirements of sections 172(c)(2) and (6) of the CAA, and the requirement for contingency... implemented pursuant to section 172(c)(9) or 182(c)(9) of the CAA, on the contingency of an area not making...
Parsons, Iain T; Wheatley, R J; Carter, P
2016-02-01
Exercise ASKARI SERPENT (Ex AS) is a British Army exercise that provides primary healthcare (PHC) to Kenyan civilians in support of local health authorities. It is conducted in partnership with the Kenya Defence Force Medical Services (KDFMS). Accurate epidemiological data is critical in planning the exercise and for any future short-notice contingency operations in similar environments. This paper reports epidemiological data for Ex AS using a novel data collection system. PHC on Ex AS was delivered by trained and validated combat medical technicians (CMTs) using a set of Read-coded protocols. The CMTs were also directly supported and supervised by medical officers and nurses. A total of 3093 consultations were conducted over a 16-day period. Of these, 2707 (87.5%) consultations fell within the remit of the CMT protocols, with only 386 consultations (12.5%) being conducted exclusively by the medical officers or nurses. A Read-coded matrix built on CMT protocols is a simple and useful tool, particularly in civilian populations, for collecting morbidity data with the vast majority of conditions accounted for in the protocols. It is anticipated that such a system can better inform training, manning, medical material and pharmaceutical procurement than current category-based morbidity surveillance systems such as EPINATO (NATO epidemiological data). There is clear advantage to directly linking data capture to treatment algorithms. Accuracy, both in terms of numbers and condition, is likely improved. Data is also captured contemporaneously rather than after indeterminate time. Read coding has the added benefit of being an established electronic standard. In addition, the system would support traditional reporting methods such as EPINATO by providing increased assurance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... civilian employees deployed in support of a contingency operation, to elect Basic insurance, Option A... after the operations of the Senate Restaurants are contracted to be performed by a private business... for Basic insurance coverage and is deployed in support of a contingency operation as defined by...
40 CFR 52.73 - Approval of plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Strategies (Section III.B.5), Modeling and Projections (Section III.B.6), Contingency Plan (Section III.B.7...), Modeling and Projections (Section III.C.6), and Air Quality Conformity Procedures (Section III.C.10); and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... available control measures, a reasonable further progress (RFP) plan, and contingency measures for failure... proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments...
Masud, Muhammad Mehedi; Junsheng, Ha; Akhtar, Rulia; Al-Amin, Abul Quasem; Kari, Fatimah Binti
2015-02-01
This paper estimates Malaysian farmers' willingness to pay (WTP) for a planned adaptation programme for addressing climate issues in the Malaysian agricultural sector. We used the contingent valuation method (CVM) for a monetary valuation of farmers' preferences for a planned adaptation programme by ascertaining the value attached to address climatic issues in the Malaysian agricultural sector. Structured questionnaires were distributed among the sampled farmers. The study found that 74 % of respondents were willing to pay for a planned adaptation programme and that several socioeconomic and motivation factors have greater influence on their WTP. This paper clearly specifies the steps needed for all institutional bodies to better address issues in climate change. The outcomes of this paper will support policy makers to better design an efficient adaptation framework for adapting to the adverse impacts of climate change.
Sustainability Criteria for Contingency Bases
2014-09-01
and construction sustainability pro - grams and identified concepts, guidelines, and practices relevant to mili- tary contingency infrastructure...incorporate best practices in force pro - tection, e.g., facility spacing to limit damage to multiple buildings from a single incoming rocket or mortar...The Logistics Civil Augmentation Program (LOGCAP) is a program administered by the US Army to pro - vide contingency support
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Contingency Operations (DFARS Case 2009- D020) AGENCY: Defense Acquisition Regulations System, Department of... exemptions from the Prompt Payment Act. The interim rule exempted military payments related to contingencies.... 93-288, as amended (42 U.S.C. 5121, et seq.); contingency operations (as defined in 10 U.S.C. 101(a...
[Carry forward the successes].
1983-02-27
Achievements of the National Publicity Month on Family Planning in China came about for the following reasons: the Party Central Committee and the State Council formulated correct principles and policies and party committees and governments at all levels strengthened their leadership; the people, particularly the peasants, responded enthusiastically to the calls and actively began to practice family planning; and all relevant departments along with the staff in family planning and medical units actively participated in the work. Recognizing the achievements of the publicity month, it is necessary to acknowledge the fact that work in family planning continues to be a longterm and arduous effort. China is entering a 15-year period of peak fertility. Each year 20 million couples will be entering the marriage and fertility age, and the slightest relaxation in birth planning will result in great swells in population and irrevocable consequences. Efforts cannot be relaxed. It is essential to keep up the momentum generated by the publicity month and to expand achievements. An important experience gained in the publicity month is that all localities should form 3 contingents of people: a publicity contingent; a technical contingent; and an activist continent. Their efforts are the guarantee to success in family planning. Thus far, China has trained 15 million publicity workers and 750,000 technical personnel. Large numbers of activists have also emerged from among the people. It is important to continue to educate the people. Experience shows that an effective method is to demonstrate possible results with specific calculations and make comparisons. Explaining Chinese realities and possible consequences without family planning should help the peasants to understand the relationship between family planning and the future of China. Publicity and education must be integrated with implementation of birth control measures. Specific guidance on how to practice birth control must be provided.
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Area response drills. 300.212 Section... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.212 Area response drills. The OSC periodically shall conduct...
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Area response drills. 300.212 Section... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.212 Area response drills. The OSC periodically shall conduct...
76 FR 23109 - Enhancing Airline Passenger Protections
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... Department; expanding the group of carriers that are required to adopt, follow, and audit customer service... carriers to those required to include their contingency plans and customer service plans on their websites..., and audit customer service plans. The rule also defined chronically delayed flights and deemed them to...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
A systems view of mother-infant face-to-face communication.
Beebe, Beatrice; Messinger, Daniel; Bahrick, Lorraine E; Margolis, Amy; Buck, Karen A; Chen, Henian
2016-04-01
Principles of a dynamic, dyadic systems view of mother-infant face-to-face communication, which considers self- and interactive processes in relation to one another, were tested. The process of interaction across time in a large low-risk community sample at infant age 4 months was examined. Split-screen videotape was coded on a 1-s time base for communication modalities of attention, affect, orientation, touch, and composite facial-visual engagement. Time-series approaches generated self- and interactive contingency estimates in each modality. Evidence supporting the following principles was obtained: (a) Significant moment-to-moment predictability within each partner (self-contingency) and between the partners (interactive contingency) characterizes mother-infant communication. (b) Interactive contingency is organized by a bidirectional, but asymmetrical, process: Maternal contingent coordination with infant is higher than infant contingent coordination with mother. (c) Self-contingency organizes communication to a far greater extent than interactive contingency. (d) Self- and interactive contingency processes are not separate; each affects the other in communication modalities of facial affect, facial-visual engagement, and orientation. Each person's self-organization exists in a dynamic, homoeostatic (negative feedback) balance with the degree to which the person coordinates with the partner. For example, those individuals who are less facially stable are likely to coordinate more strongly with the partner's facial affect and vice versa. Our findings support the concept that the dyad is a fundamental unit of analysis in the investigation of early interaction. Moreover, an individual's self-contingency is influenced by the way the individual coordinates with the partner. Our results imply that it is not appropriate to conceptualize interactive processes without simultaneously accounting for dynamically interrelated self-organizing processes. (c) 2016 APA, all rights reserved).
A Systems View of Mother-Infant Face-to-Face Communication
Beebe, Beatrice; Messinger, Daniel; Bahrick, Lorraine E.; Margolis, Amy; Buck, Karen A.; Chen, Henian
2016-01-01
Principles of a dynamic, dyadic systems view of mother-infant face-to-face communication, which considers self- and interactive processes in relation to one another, were tested. We examined the process of interaction across time in a large, low-risk community sample, at infant age 4 months. Split-screen videotape was coded on a 1-s time base for communication modalities of attention, affect, orientation, touch and composite facial-visual engagement. Time-series approaches generated self- and interactive contingency estimates in each modality. Evidence supporting the following principles was obtained: (1) Significant moment-to-moment predictability within each partner (self-contingency) and between the partners (interactive contingency) characterizes mother-infant communication. (2) Interactive contingency is organized by a bi-directional, but asymmetrical, process: maternal contingent coordination with infant is higher than infant contingent coordination with mother. (3) Self-contingency organizes communication to a far greater extent than interactive contingency. (4) Self-and interactive contingency processes are not separate; each affects the other, in communication modalities of facial affect, facial-visual engagement, and orientation. Each person’s self-organization exists in a dynamic, homoeostatic (negative feedback) balance with the degree to which the person coordinates with the partner. For example, those individuals who are less facially stable are likely to coordinate more strongly with the partner’s facial affect; and vice-versa. Our findings support the concept that the dyad is a fundamental unit of analysis in the investigation of early interaction. Moreover, an individual’s self-contingency is influenced by the way the individual coordinates with the partner. Our results imply that it is not appropriate to conceptualize interactive processes without simultaneously accounting for dynamically inter-related self-organizing processes. PMID:26882118
Familiarity and Personal Experience as Mediators of Recall when Planning for Future Contingencies
ERIC Educational Resources Information Center
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.; Lax, Moshe L.
2012-01-01
In this article, we demonstrate that planning tasks enhance recall when the context of planning (a) is self-referential and (b) draws on familiar scenarios represented in episodic memory. Specifically, we show that when planning tasks are sorted according to the degree to which they evoke memories of personally familiar scenarios (e.g., planning a…
Single- and Dual-Process Models of Biased Contingency Detection
2016-01-01
Abstract. Decades of research in causal and contingency learning show that people’s estimations of the degree of contingency between two events are easily biased by the relative probabilities of those two events. If two events co-occur frequently, then people tend to overestimate the strength of the contingency between them. Traditionally, these biases have been explained in terms of relatively simple single-process models of learning and reasoning. However, more recently some authors have found that these biases do not appear in all dependent variables and have proposed dual-process models to explain these dissociations between variables. In the present paper we review the evidence for dissociations supporting dual-process models and we point out important shortcomings of this literature. Some dissociations seem to be difficult to replicate or poorly generalizable and others can be attributed to methodological artifacts. Overall, we conclude that support for dual-process models of biased contingency detection is scarce and inconclusive. PMID:27025532
When does self-esteem relate to deviant behavior? The role of contingencies of self-worth.
Ferris, D Lance; Brown, Douglas J; Lian, Huiwen; Keeping, Lisa M
2009-09-01
Researchers have assumed that low self-esteem predicts deviance, but empirical results have been mixed. This article draws upon recent theoretical developments regarding contingencies of self-worth to clarify the self-esteem/deviance relation. It was predicted that self-esteem level would relate to deviance only when self-esteem was not contingent on workplace performance. In this manner, contingent self-esteem is a boundary condition for self-consistency/behavioral plasticity theory predictions. Using multisource data collected from 123 employees over 6 months, the authors examined the interaction between level (high/low) and type (contingent/noncontingent) of self-esteem in predicting workplace deviance. Results support the hypothesized moderating effects of contingent self-esteem; implications for self-esteem theories are discussed.
Skype me! Socially Contingent Interactions Help Toddlers Learn Language
Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick
2013-01-01
Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). The current study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. PMID:24112079
30 CFR 250.1617 - Application for permit to drill.
Code of Federal Regulations, 2010 CFR
2010-07-01
... BOP equipment, (ii) A schematic drawing of the diverter system to be used (plan and elevation views... survey program for directionally drilled wells; (9) An H2S Contingency Plan, if applicable, and if not...
45 CFR 1306.35 - Family child care program option.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must have systems for assuring the safety of any child not within view for any period (e.g. the... develop contingency plans for emergencies. Such plans may include, but are not limited to, the use of...
Strategic Planning in Education: A Guide for Policymakers.
ERIC Educational Resources Information Center
Cooper, Harry A.
As defined in chapter I of this guide for policymakers, strategic planning is the method by which an organization identifies relevant trends in its environment, analyzes their potential implications, and projects an integrated strategy to address these future events and their contingencies. This process differs from formalized planning, based on…
40 CFR 300.130 - Determinations to initiate response and special conditions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... President, the FEMA may activate the Federal Response Plan (FRP). A FCO, designated by the President, may... HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.130... assistance procedures described in the appropriate Federal Radiological Plan. For the purpose of the NCP, the...
40 CFR 300.130 - Determinations to initiate response and special conditions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... President, the FEMA may activate the Federal Response Plan (FRP). A FCO, designated by the President, may... HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.130... assistance procedures described in the appropriate Federal Radiological Plan. For the purpose of the NCP, the...
40 CFR 300.130 - Determinations to initiate response and special conditions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... President, the FEMA may activate the Federal Response Plan (FRP). A FCO, designated by the President, may... HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.130... assistance procedures described in the appropriate Federal Radiological Plan. For the purpose of the NCP, the...
40 CFR 300.130 - Determinations to initiate response and special conditions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... President, the FEMA may activate the Federal Response Plan (FRP). A FCO, designated by the President, may... HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.130... assistance procedures described in the appropriate Federal Radiological Plan. For the purpose of the NCP, the...
40 CFR 300.130 - Determinations to initiate response and special conditions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... President, the FEMA may activate the Federal Response Plan (FRP). A FCO, designated by the President, may... HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.130... assistance procedures described in the appropriate Federal Radiological Plan. For the purpose of the NCP, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
...; Particulate Matter 2002 Base Year Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION... 2.5 ) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revisions... control measures (RACM), reasonable further progress (RFP) plans, contingency measures, a 2002 base year...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... Promulgation of Implementation Plans; Kentucky; Louisville; Fine Particulate Matter 2002 Base Year Emissions... approve the fine particulate matter (PM 2.5 ) 2002 base year emissions inventory, portion of the State...), a reasonable further progress (RFP) plan, contingency measures, a 2002 base year emissions inventory...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-01
... 2005 Base Year Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve the fine particulate matter (PM 2.5 ) 2005 base year emissions...) plan, contingency measures, a 2005 base year emissions inventory and other planning SIP revisions...
Contracting Deployment Customer Guide.
1996-12-01
functional managers from the major commands expressed the need to develop a Customer Guide for contingency deployments which would standardize, simplify, and...streamline the support our Contingency Contracting Officers (CCOs) provide to our customers .
Preparing for possible motor fuel shortages: a community planning guide, Roswell, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This guide is prepared to provide a practical approach for the community of Roswell, New Mexico, to respond to fuel supply disruptions. It contains: overviews highlighting fuel supplies and government roles in emergency transportation planning; factors in contingency planning which include community profiles, needs, resources, and constraints; and the local emergency planning process. (MHR)
ERIC Educational Resources Information Center
Rothwell, William J.; Cookson, Peter S.
This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…
Defense.gov Special Report: Government Shutdown - What You Need to Know
Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations
29 CFR 825.126 - Leave because of a qualifying exigency.
Code of Federal Regulations, 2011 CFR
2011-07-01
... spouse, son, daughter, or parent (the “covered military member”) is on active duty or call to active duty... notified of an impending call or order to active duty in support of a contingency operation seven or less... call or order to active duty in support of a contingency operation; (2) Military events and related...
Designing and Implementing Group Contingencies in the Classroom: A Teacher's Guide
ERIC Educational Resources Information Center
Chow, Jason C.; Gilmour, Allison F.
2016-01-01
Group contingencies are a positive, proactive classroom management technique that works well as Tier 1 of a multi-tiered system of behavior support. These programs are adaptable to student and classroom needs and work well to support the behavior of students with disabilities in general education classrooms. Off-the-shelf programs exist, but…
Okland, Bjørn; Skarpaas, Olav; Schroeder, Martin; Magnusson, Christer; Lindelöw, Ake; Thunes, Karl
2010-09-01
The pinewood nematode (PWN) is one of the worst tree-killing exotic pests in East-Asian countries. The first European record of establishment in Portugal in 1999 triggered extensive surveys and contingency plans for eradication in European countries, including immediate removal of large areas of conifer host trees. Using Norway as an example, we applied a simulation model to evaluate the chance of successful eradication of a hypothetical introduction by the current contingency plan in a northern area where wilting symptoms are not expected to occur. Despite a highly variable spread of nematode infestations in space and time, the probability of successful eradication in 20 years was consistently low (mean 0.035, SE 0.02). The low success did not change significantly by varying the biological parameters in sensitivity analyses (SA), probably due to the late detection of infestations by the survey (mean 14.3 years). SA revealed a strong influence of management parameters. However, a high probability of eradication required unrealistic measures: achieving an eradication probability of 0.99 in 20 years required 10,000 survey samples per year and a host tree removal radius of 8,000 m around each detection point. © 2010 Society for Risk Analysis.
Rafael Arévalo; Benjamin W. van Ee; Ricarda Riina; Paul E. Berry; Alex C. Wiedenhoeft
2017-01-01
Background and Aims Wood is a major innovation of land plants, and is usually a central component of the body plan for two major plant habits: shrubs and trees. Wood anatomical syndromes vary between shrubs and trees, but no prior work has explicitly evaluated the contingent evolution of wood anatomical diversity in the context...
Extreme Environment Basing:Contingency Basing in Dense Urban and Megacity Environments
2016-05-24
the placement of a U.S. military contingency base. As stated above, the consideration given to the volume of displaced people caused by the base camp...population density , Dhaka, Bangladesh ........................... 29 B-1 The base camp development planning process...urban areas are not incredibly dense, a great many are. These places represent the extreme end of the urban spectrum for population density and city
National Marrow Donor Program. HLA Typing for Bone Marrow Transplantation
2014-11-30
educate the transplant community about the critical importance of establishing a nationwide contingency response plan. 2. Rapid Identification of...Expand Network Communications 59 IIB 4.2 Central Contingency Management 59 IIC Immunogenetic Studies 63 IIC.1.1 Donor Recipient Pair Project 63 IIC...Amendment CMCR Centers for Medical Countermeasures Against Radiation CMDP China Marrow Donor Program CME Continuing Medical Education CMF Community
Development of Medical Technology for Contingency Response to Marrow Toxic Agents
2014-07-11
the transplant community about the critical importance of establishing a nationwide contingency response plan. 2. Rapid Identification of Matched...to rapidly identify the best available donor or cord blood unit for each patient utilizing its state-of-the-art communication infrastructure, sample...York City (NYC)-NY State Radiological Disaster - tabletop exercise 2. Minneapolis-full scale exercise 3. Dana Farber Cancer Institute – full
EVA worksite analysis--use of computer analysis for EVA operations development and execution.
Anderson, D
1999-01-01
To sustain the rate of extravehicular activity (EVA) required to assemble and maintain the International Space Station, we must enhance our ability to plan, train for, and execute EVAs. An underlying analysis capability has been developed to ensure EVA access to all external worksites as a starting point for ground training, to generate information needed for on-orbit training, and to react quickly to develop contingency EVA plans, techniques, and procedures. This paper describes the use of computer-based EVA worksite analysis techniques for EVA worksite design. EVA worksite analysis has been used to design 80% of EVA worksites on the U.S. portion of the International Space Station. With the launch of the first U.S. element of the station, EVA worksite analysis is being developed further to support real-time analysis of unplanned EVA operations. This paper describes this development and deployment of EVA worksite analysis for International Space Station (ISS) mission support.
The Hubble Space Telescope servicing missions: Past, present, and future operational challenges
NASA Technical Reports Server (NTRS)
Ochs, William R.; Barbehenn, George M.; Crabb, William G.
1996-01-01
The Hubble Space Telescope was designed to be serviced by the Space Shuttle to upgrade systems, replace failed components and boost the telescope into higher orbits. There exists many operational challenges that must be addressed in preparation for the execution of a servicing mission, including technical and managerial issues. The operational challenges faced by the Hubble operations and ground system project for the support of the first servicing mission and future servicing missions, are considered. The emphasis is on those areas that helped ensure the success of the mission, including training, testing and contingency planning.
Overview of error-tolerant cockpit research
NASA Technical Reports Server (NTRS)
Abbott, Kathy
1990-01-01
The objectives of research in intelligent cockpit aids and intelligent error-tolerant systems are stated. In intelligent cockpit aids research, the objective is to provide increased aid and support to the flight crew of civil transport aircraft through the use of artificial intelligence techniques combined with traditional automation. In intelligent error-tolerant systems, the objective is to develop and evaluate cockpit systems that provide flight crews with safe and effective ways and means to manage aircraft systems, plan and replan flights, and respond to contingencies. A subsystems fault management functional diagram is given. All information is in viewgraph form.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Funding. 300.335 Section 300.335 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Funding. 300.335 Section 300.335 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Funding. 300.335 Section 300.335 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN...
InaSAFE applications in disaster preparedness
NASA Astrophysics Data System (ADS)
Pranantyo, Ignatius Ryan; Fadmastuti, Mahardika; Chandra, Fredy
2015-04-01
Disaster preparedness activities aim to reduce the impact of disasters by being better prepared to respond when a disaster occurs. In order to better anticipate requirements during a disaster, contingency planning activities can be undertaken prior to a disaster based on a realistic disaster scenario. InaSAFE is a tool that can inform this process. InaSAFE is a free and open source software that estimates the impact to people and infrastructure from potential hazard scenarios. By using InaSAFE, disaster managers can develop scenarios of disaster impacts (people and infrastructures affected) to inform their contingency plan and emergency response operation plan. While InaSAFE provides the software framework exposure data and hazard data are needed as inputs to run this software. Then InaSAFE can be used to forecast the impact of the hazard scenario to the exposure data. InaSAFE outputs include estimates of the number of people, buildings and roads are affected, list of minimum needs (rice and clean water), and response checklist. InaSAFE is developed by Indonesia's National Disaster Management Agency (BNPB) and the Australian Government, through the Australia-Indonesia Facility for Disaster Reduction (AIFDR), in partnership with the World Bank - Global Facility for Disaster Reduction and Recovery (GFDRR). This software has been used in many parts of Indonesia, including Padang, Maumere, Jakarta, and Slamet Mountain for emergency response and contingency planning.
ATC contingency operations in the en-route flight regime
NASA Technical Reports Server (NTRS)
Lyman, E. G.
1981-01-01
Air traffic control (ATC) operations were examined to learn what factors of controller performance should be given consideration in the design and development of future automation systems enhancing ATC. Contingencies were of two types: those constraining airspace usage or traffic flow (i.e., weather); and those related to system and equipment usage (i.e., radar/radio status). Examination of controller response to contingencies and workload pressures showed differing effects on controller allocations of effort among the three primary function of planning, monitoring, and informaton transfer. Automation advancements oriented towards aiding the controller in performing monitoring tasks may offer the most substantial safety benefit.
ERIC Educational Resources Information Center
Vidoni, Carla; Ward, Phillip
2006-01-01
This study investigated the effects of a dependent group-oriented contingency on the supportive and non-supportive fair play behaviors of 6th grade students engaged in volleyball games as part of their physical education instruction. Six students, one male and one female per class, from three classes, identified as demonstrating low incidences of…
Analysis of Contemporary Contingency Contracting Educational Resources
2010-12-01
Afghanistan by providing base operations support (e.g., food and housing); communication services; tactical and nontactical vehicle maintenance...Contingency Contracting Handbook on which it is based) and CON 334, mentioned earlier, are widely accessible to all acquisition communities across the DoD...missions, and humanitarian relief efforts. The services provided include base operations support (e.g., food and housing), communication services
When Disaster Strikes Is Logistics and Contracting Support Ready?
2011-09-27
improve response in the event of an actual crisis . The Defense Contingency Contracting Handbook (Christianson, A., Coombs , J., Harbin, S., Ingram...AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Recent crisis responses, including the...and management of the DoD?s logistics and contracting support for contingency, expeditionary, and crisis response, and provide specific recommendations
Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases
2012-05-22
Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on
An Enrollment Marketing Plan for Institutions of Higher Learning: An Update.
ERIC Educational Resources Information Center
Bingham, Frank G., Jr.
1996-01-01
A college marketing model consisting of several strategies and contingency plans for decision-making under difficult conditions is outlined. The plan provides for orderly transition from one marketing stage to the next logical stage, allowing some control over both internal and external environments, and providing insight into the delicate…
78 FR 30804 - Transmission Planning Reliability Standards
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... ``Non-Consequential Load Loss.'' 6. On the same day that the Commission issued Order No. 762, it issued... Non-Consequential Load Loss meets the conditions shown in Attachment 1. In no case can the planned Non...- consequential load loss following a single contingency provided that the plan is documented and vetted in an...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-28
.... Provide specific examples to illustrate your concerns, and suggest alternatives. 7. Explain your views as... reasonable further progress (RFP) plan, contingency measures, and any other planning State Implementation... did not clearly explain EPA's views on the applicability of CFR 51.1004(c) to the 2006 PM 2.5 NAAQS...
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
Code of Federal Regulations, 2010 CFR
2010-07-01
... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN... contaminants which may present an imminent and substantial danger to public health or welfare of the United... implementing the NCP, consideration shall be given to international assistance plans and agreements, security...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...
Weather variability and adaptive management for rangeland restoration
USDA-ARS?s Scientific Manuscript database
Inherent weather variability in upland rangeland systems requires relatively long-term goal setting, and contingency planning for partial success or failure in any given year. Rangeland plant communities are dynamic systems and successional planning is essential for achieving and maintaining system...
Development Of Medical Technology For Contingency Response To Marrow Toxic Agents, Period 3
2011-10-31
featured speaker on the response to the Fukushima Daiichi nuclear power plant incident by the HSCT community at the RITN State of the Science Meeting...Bioterrorism: Biodefense Strategy, Practice, and Science A manuscript in preparation for Leukemia on response to the Fukushima Daiichi nuclear power...from transplant centers, build awareness of the Transplant Center Contingency Planning Committee and educate the transplant community about the critical
A Method for Suppressing Line Overload Phenomena Using NAS Battery Systems
NASA Astrophysics Data System (ADS)
Ohtaka, Toshiya; Iwamoto, Shinichi
In this paper, we pay attention to the superior operating control function and instantaneous discharging characteristics of NAS battery systems, and propose a method for determining installation planning and operating control schemes of NAS battery systems for suppressing line overload phenomena. In the stage of planning, a target contingency is identified, and an optimal allocation and capacity of NAS battery systems and an amount of generation changes are determined for the contingency. In the stage of operation, the control strategy of NAS battery system is determined. Simulations are carried out for verifying the validity of the proposed method using the IEEJ 1 machine V system model and an example 2 machine 16 bus system model.
Incentives for nondiscriminatory wellness programs in group health plans. Final rule.
2013-06-03
This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... available control technology (RACT) and reasonably available control measures (RACM); reasonable further... determination for PM 2.5 and nitrogen oxides (NO X ) for the mobile source contribution to ambient PM 2.5 levels..., an RFP plan, contingency measures, and an insignificance determination for mobile direct PM 2.5 and...
29 CFR 2510.3-3 - Employee benefit plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... section clarifies the definition in section 3(3) of the term “employee benefit plan” for purposes of title... receive any benefit under the plan even if the contingency for which such benefit is provided should occur... 29 Labor 9 2010-07-01 2010-07-01 false Employee benefit plan. 2510.3-3 Section 2510.3-3 Labor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
... Alabama Department of Environmental Management (ADEM), on January 10, 2012, for parallel processing. ADEM... portion of the Alabama SIP to the contingency measures portions of the maintenance plans for the... proposed maintenance plans for the 1997 annual fine particulate matter (PM 2.5 ) standards, and the 2006 24...
Energy emergency contingency plan
NASA Astrophysics Data System (ADS)
1980-11-01
The feasibility of implementing certain contingency measures to relieve or eliminate capacity shortfalls on subsidized bus transportation under the auspices of the New Jersey Transit Corporation is detailed. The primary purpose is to evaluate effective short range strategies to expand existing transit services, capable of being implemented within two weeks, should a reduction of fuel supplies curtail travel by automobile. The study area is in the nine northern counties of New Jersey under Tri-State jurisdiction.
Astronaut Linda Godwin during contingency EVA training in WETF
1993-08-17
S93-41572 (17 Aug 1993) --- Astronaut Linda M. Godwin, payload commander, prepares to donn her helmet before being submerged in a 25-feet deep pool at the Johnson Space Center's (JSC) Weightless Environment Training Facility (WET-F). Astronauts Godwin and Thomas D. Jones, mission specialist, are using the WET-F to train for contingency space walks for their Space Shuttle Endeavour mission next year. No space walks are planned for the flight.
NASA Technical Reports Server (NTRS)
Vanvalkenburgh, C. N.
1984-01-01
Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.
Roane, Henry S; Fisher, Wayne W; McDonough, Erin M
2003-01-01
Scientific research progresses along planned (programmatic research) and unplanned (discovery research) paths. In the current investigation, we attempted to conduct a single-case evaluation of the overjustification effect (i.e., programmatic research). Results of the initial analysis were contrary to the overjustification hypothesis in that removal of the reward contingency produced an increase in responding. Based on this unexpected finding, we conducted subsequent analyses to further evaluate the mechanisms underlying these results (i.e., discovery research). Results of the additional analyses suggested that the reward contingency functioned as punishment (because the participant preferred the task to the rewards) and that withdrawal of the contingency produced punishment contrast.
Roane, Henry S; Fisher, Wayne W; McDonough, Erin M
2003-01-01
Scientific research progresses along planned (programmatic research) and unplanned (discovery research) paths. In the current investigation, we attempted to conduct a single-case evaluation of the overjustification effect (i.e., programmatic research). Results of the initial analysis were contrary to the overjustification hypothesis in that removal of the reward contingency produced an increase in responding. Based on this unexpected finding, we conducted subsequent analyses to further evaluate the mechanisms underlying these results (i.e., discovery research). Results of the additional analyses suggested that the reward contingency functioned as punishment (because the participant preferred the task to the rewards) and that withdrawal of the contingency produced punishment contrast. PMID:12723865
EVA Design, Verification, and On-Orbit Operations Support Using Worksite Analysis
NASA Technical Reports Server (NTRS)
Hagale, Thomas J.; Price, Larry R.
2000-01-01
The International Space Station (ISS) design is a very large and complex orbiting structure with thousands of Extravehicular Activity (EVA) worksites. These worksites are used to assemble and maintain the ISS. The challenge facing EVA designers was how to design, verify, and operationally support such a large number of worksites within cost and schedule. This has been solved through the practical use of computer aided design (CAD) graphical techniques that have been developed and used with a high degree of success over the past decade. The EVA design process allows analysts to work concurrently with hardware designers so that EVA equipment can be incorporated and structures configured to allow for EVA access and manipulation. Compliance with EVA requirements is strictly enforced during the design process. These techniques and procedures, coupled with neutral buoyancy underwater testing, have proven most valuable in the development, verification, and on-orbit support of planned or contingency EVA worksites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and naturalmore » gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.« less
Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies
NASA Technical Reports Server (NTRS)
Van Cise, Edward A.; Kelly, Brian J.; Radigan, Jeffery P.; Cranmer, Curtis W.
2016-01-01
Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-01-14
The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources frommore » within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
This Record of Decision (ROD) document presents the selected remedial action for the six areas of concern (AOCs) located at the Cornhusker Army Ammunition Plant (CHAAP) in Grand Island, Nebraska designated as OU2. The remedial action is chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERLCA), as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and with the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The information supporting the decisions contained in the remedy is contained in the administrative record.
NASA Technical Reports Server (NTRS)
Webbon, B. W.; Copeland, R. J.; Wood, P. W., Jr.; Cox, R. L.
1973-01-01
The guidelines for EVA and IVA tasks to be performed on the space shuttle are defined. In deriving tasks, guidelines, and constraints, payloads were first identified from the mission model. Payload requirements, together with man and manipulator capabilities, vehicle characteristics and operation, and safety considerations led to a definition of candidate tasks. Guidelines and constraints were also established from these considerations. Scenarios were established, and screening criteria, such as commonality of EVA and IVA activities, were applied to derive representative planned and unplanned tasks. The whole spectrum of credible contingency situations with a potential requirement for EVA/IVA was analyzed.
Geoscience research databases for coastal Alabama ecosystem management
Hummell, Richard L.
1995-01-01
Effective management of complex coastal ecosystems necessitates access to scientific knowledge that can be acquired through a multidisciplinary approach involving Federal and State scientists that take advantage of agency expertise and resources for the benefit of all participants working toward a set of common research and management goals. Cooperative geostatic investigations have led toward building databases of fundamental scientific knowledge that can be utilized to manage coastal Alabama's natural and future development. These databases have been used to assess the occurrence and economic potential of hard mineral resources in the Alabama EFZ, and to support oil spill contingency planning and environmental analysis for coastal Alabama.
Optimizing Global Force Management for Special Operations Forces
2016-12-01
5323 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of the author and do not...plans and apportions forces to combatant commands based on SecDef’s contingency planning guidance (GFM Division 2016) (Figure 1). 3 The image
Massachusetts wants a tougher federal oil spill control plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Massachusetts wants a tougher federal oil spill control plan and has petitioned the U.S. Council on Environmental Quality (CEQ). The present oil spill contingency plan is inadequate, according to M. Dukakis (Gov. Mass.). The Massachusetts plan, which CEQ officials view favorably, would extend responsibility to the 200 mi fishing limit, provide for protection of birds, and set up an oil strike force on 24 hr alert.
30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...
30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...
30 CFR 254.28 - What information must I include in the “In situ burning plan” appendix?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What information must I include in the âIn situ... information must I include in the “In situ burning plan” appendix? Your in situ burning plan must be... Contingency Plan(s). Your in situ burning plan must include: (a) A description of the in situ burn equipment...
Visiting Vehicle Ground Trajectory Tool
NASA Technical Reports Server (NTRS)
Hamm, Dustin
2013-01-01
The International Space Station (ISS) Visiting Vehicle Group needed a targeting tool for vehicles that rendezvous with the ISS. The Visiting Vehicle Ground Trajectory targeting tool provides the ability to perform both realtime and planning operations for the Visiting Vehicle Group. This tool provides a highly reconfigurable base, which allows the Visiting Vehicle Group to perform their work. The application is composed of a telemetry processing function, a relative motion function, a targeting function, a vector view, and 2D/3D world map type graphics. The software tool provides the ability to plan a rendezvous trajectory for vehicles that visit the ISS. It models these relative trajectories using planned and realtime data from the vehicle. The tool monitors ongoing rendezvous trajectory relative motion, and ensures visiting vehicles stay within agreed corridors. The software provides the ability to update or re-plan a rendezvous to support contingency operations. Adding new parameters and incorporating them into the system was previously not available on-the-fly. If an unanticipated capability wasn't discovered until the vehicle was flying, there was no way to update things.
Astronaut Linda Godwin during contingency EVA training in WETF
1993-08-17
S93-41574 (17 Aug 1993) --- Astronaut Linda M. Godwin, payload commander, prepares to be submerged in a 25-feet deep pool at the Johnson Space Center's (JSC) Weightless Environment Training Facility (WET-F). Astronauts Godwin and Thomas D. Jones (out of frame at left), mission specialist, are using the WET-F to train for contingency space walks for their STS-59 Space Shuttle Endeavour mission next year. No space walks are planned for the flight.
2008-01-01
government agencies and military Services and the militaries of coalition partners. 147 appendix a Domestic and International Law in Army Contingency...Foreign Courts. Most crimes, even those having an international dimension, are tried in state tribunals. For Service mem- bers, the state tribunal most...court other than that of the host nation could seek to try a U.S. Service member for an international crime, but such a trial would be unlikely
Development of Medical Technology for Contingency Response to Marrow Toxic Agents
2013-01-31
REPORT NUMBER N/A collaboration and data Standard Form 298 (Rev. 8-98) Prescribed by ANSI-Std Z39-l8 1 of 20 Grant Award N00014-12-1-0142...Closed 4 IIA.2 Objective 2 – Coordination of Care of Casualties Task 1 – Contingency Response Network Open 4 Task 2 – Standard Operating...manuscript Biosecurity and Bioterrorism: Biodefense Strategy, Practice, and Science entitled,” Medical planning and response for a nuclear detonation: a
Martín-Fernández, Jesús; Pérez-Rivas, Francisco Javier; Gómez-Gascón, Tomás; del Cura-González, Isabel; Tello Bernabé, Eugenia; Rodríguez-Martínez, Gemma; Polentinos-Castro, Elena; Domínguez-Bidagor, Julia; Ariza-Cardiel, Gloria; Conde-López, Juan Francisco; Beamud-Lagos, Milagros; Aguado-Arroyo, Oscar; Sanz-Bayona, Teresa; Gil-Lacruz, Ana Isabel
2011-10-03
The identification of the attribution of economic value that users of a health system assign to a health service could be useful in planning these services. The method of contingent valuation can provide information about the user's perception of value in monetary terms, and therefore comparable between services of a very different nature. This study attempts to extract the economic value that the subject, user of primary care nursing services in a public health system, attributes to this service by the method of contingent valuation, based on the perspectives of Willingness to Pay (WTP) and Willingness to Accept [Compensation] (WTA). This is an economic study with a transversal design. The contingent valuation method will be used to estimate the user's willingness to pay (WTP) for the care received from the primary care nurse and the willingness to accept [compensation] (WTA), were this service eliminated. A survey that meets the requisites of the contingent valuation method will be constructed and pilot-tested. Subsequently, 600 interviews will be performed with subjects chosen by systematic randomized sampling from among those who visit nursing at twenty health centers with different socioeconomic characteristics in the Community of Madrid. The characteristics of the subject and of the care received that can explain the variations in WTP, WTA and in the WTP/WTA ratio expressed will be studied. A theoretical validation of contingent valuation will be performed constructing two explanatory multivariate mixed models in which the dependent variable will be WTP, and the WTP/WTA relationship, respectively. The identification of the attribution of economic value to a health service that does not have a direct price at the time of use, such as a visit to primary care nursing, and the definition of a profile of "loss aversion" in reference to the service evaluated, can be relevant elements in planning, enabling incorporating patient preferences to health policy decision-making.
2011-01-01
Background The identification of the attribution of economic value that users of a health system assign to a health service could be useful in planning these services. The method of contingent valuation can provide information about the user's perception of value in monetary terms, and therefore comparable between services of a very different nature. This study attempts to extract the economic value that the subject, user of primary care nursing services in a public health system, attributes to this service by the method of contingent valuation, based on the perspectives of Willingness to Pay (WTP) and Willingness to Accept [Compensation] (WTA). Methods/Design This is an economic study with a transversal design. The contingent valuation method will be used to estimate the user's willingness to pay (WTP) for the care received from the primary care nurse and the willingness to accept [compensation] (WTA), were this service eliminated. A survey that meets the requisites of the contingent valuation method will be constructed and pilot-tested. Subsequently, 600 interviews will be performed with subjects chosen by systematic randomized sampling from among those who visit nursing at twenty health centers with different socioeconomic characteristics in the Community of Madrid. The characteristics of the subject and of the care received that can explain the variations in WTP, WTA and in the WTP/WTA ratio expressed will be studied. A theoretical validation of contingent valuation will be performed constructing two explanatory multivariate mixed models in which the dependent variable will be WTP, and the WTP/WTA relationship, respectively. Discussion The identification of the attribution of economic value to a health service that does not have a direct price at the time of use, such as a visit to primary care nursing, and the definition of a profile of "loss aversion" in reference to the service evaluated, can be relevant elements in planning, enabling incorporating patient preferences to health policy decision-making. PMID:21967306
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
...) emissions inventory requirements; (3) modeling; (4) RACM and RACT; (5) RFP; (6) contingency measures; and (7... there are multiple precursors to PM 10 , and in particular to PM 2.5 .\\20\\ PM 2.5 chemical precursors... Philadelphia Area. D. Modeling As required, Delaware submitted modeling as part of the attainment plan for the...
Taylor, E B; McPhail, J D
2000-01-01
Historical contingency and determinism are often cast as opposing paradigms under which evolutionary diversification operates. It may be, however, that both factors act together to promote evolutionary divergence, although there are few examples of such interaction in nature. We tested phylogenetic predictions of an explicit historical model of divergence (double invasions of freshwater by marine ancestors) in sympatric species of three-spined sticklebacks (Gasterosteus aculeatus) where determinism has been implicated as an important factor driving evolutionary novelty. Microsatellite DNA variation at six loci revealed relatively low genetic variation in freshwater populations, supporting the hypothesis that they were derived by colonization of freshwater by more diverse marine ancestors. Phylogenetic and genetic distance analyses suggested that pairs of sympatric species have evolved multiple times, further implicating determinism as a factor in speciation. Our data also supported predictions based on the hypothesis that the evolution of sympatric species was contingent upon 'double invasions' of postglacial lakes by ancestral marine sticklebacks. Sympatric sticklebacks, therefore, provide an example of adaptive radiation by determinism contingent upon historical conditions promoting unique ecological interactions, and illustrate how contingency and determinism may interact to generate geographical variation in species diversity PMID:11133026
Skype me! Socially contingent interactions help toddlers learn language.
Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta M
2014-01-01
Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This study focuses on whether social contingency might support word learning. Toddlers aged 24-30 months (N = 36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and noncontingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). This study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. © 2013 The Authors. Child Development © 2013 Society for Research in Child Development, Inc.
Contingency Base Energy Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-06-09
CB-EMS is the latest implementation of DSOM (Decision Support for Operations and Maintenance), which was previously patented by PNNL. CB-EMS WAS specifically designed for contingency bases for the US Army. It is a software package that is designed to monitor energy consumption at an Army contingency base to alert the camp manager when the systems are wasting energy. It's main feature that separates it from DSOM is it's ability to add systems using a plug and play menu system.
NASA Technical Reports Server (NTRS)
Billica, Roger; Chandler, Michael
1994-01-01
When NASA was established in 1958, it was known that space flight would require efforts beyond those of NASA to ensure the health and safety of our astronauts. On 10 Aug. 1958, a Secretary of Defense memorandum was signed that assigned the first Department of Defense (DOD) Manager to provide support to NASA for Project Mercury. This established a chain of command through the Joint Chiefs of Staff to the Secretary of Defense. The current charter is dated 19 Mar. 1986 and assigns the DOD Manager responsibilities to the Commander and Chief, US Space Command. The DOD Managers charter has many support areas and among them are recovery of astronauts and medical support. Today these efforts support the Space Shuttle and Space Station Programs. Briefly, the program works with each organization tasking the other through a requirements document. Level of care, communications, and recovery requirements are established; NASA and the DOD provide the capability to meet them. NASA is also responsible for the specialized training and equipment needed to meet these requirements. A Shuttle launch a KSC requires an Emergency Medical Services (EMS) coordinator on console to facilitate communications, ensure proper coverage, and coordinate with area hospitals. A contingent of NASA medical personnel are assembled to provide triage and medical support capabilities. The DOD provides medical evacuation (MEDEVAC) helicopters with surgeons and pararescue specialists (PJ's) or emergency medical technicians (EMT's). Each helicopter is equipped with at least one doctor and one PJ/EMT per astronaut crew member. Transoceanic abort landing (TAL) sites and end of mission (EOM) sites have similar structures, with TAL sites utilizing fixed wingg aircraft for MEDEVAC. The DOD also supports contingency planning for the support and return of crew members from the Space Station Freedom. Much of this support has been directed at the recovery of crew members following the landing of an Assured Crew Return Vehicle.
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2012 CFR
2012-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT..., explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan must be carried out immediately...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan must be carried out immediately whenever there...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...
National Aeronautics and Space Administration's (NASA) Automated Information Security Handbook
NASA Technical Reports Server (NTRS)
Roback, E.
1991-01-01
The NASA Automated Information Security Handbook provides NASA's overall approach to automated information systems security including discussions of such aspects as: program goals and objectives, assignment of responsibilities, risk assessment, foreign national access, contingency planning and disaster recovery, awareness training, procurement, certification, planning, and special considerations for microcomputers.