Sample records for contract construction management

  1. 48 CFR 915.404-4-71-6 - Fee base.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the Construction Contracts Schedule and Construction Management Contracts Schedule represents that... in the case of a construction or construction management contract: (1) Site preparation and utilities... fee base for the basic fee determination for a construction contract and construction management...

  2. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  3. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  4. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  5. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  6. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  7. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  8. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  9. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  10. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts or other contracts as determined by the Senior Procurement Executive, including those using the Construction, Construction Management, or Special Equipment Purchases/Subcontract... for construction and construction management contracts). However, the base amount should not normally...

  11. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  12. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  13. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  14. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  15. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  16. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  17. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  18. 48 CFR 915.404-4-70-4 - Exceptions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... used— (1) Commercialization and demonstration type contracts; (2) Management and operating contracts; (3) Construction contracts; (4) Construction management contracts; (5) Contracts primarily requiring...

  19. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  20. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  1. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  2. 48 CFR 836.602-4 - Selection authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...

  3. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  4. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  5. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  6. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  7. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  8. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  9. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  10. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  11. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  12. 48 CFR 846.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts. 846.312 Section 846.312 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.312 Construction contracts. The contracting officer shall...

  13. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  14. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  15. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  16. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  17. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  18. 48 CFR 836.603 - Collecting data on and appraising firms qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction and Facilities Management, for Central Office; the Director, Office of Construction Management... VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect...

  19. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...

  20. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction contracts. 546.312 Section 546.312 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at...

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  2. 48 CFR 849.106 - Fraud or other criminal conduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.106 Fraud or other criminal conduct. (a... following: (i) The DSPE. (ii) The Director, Office of Construction and Facilities Management, in the case of contracting officers from the Office of Construction and Facilities Management. (3) Follow procedures as...

  3. 48 CFR 48.202 - Clause for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Clause for construction contracts. 48.202 Section 48.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT VALUE ENGINEERING Contract Clauses 48.202 Clause for construction contracts. The...

  4. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  5. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  6. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  7. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  8. 48 CFR 970.3605-2 - Special construction clause for operating contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605-2 Special construction clause for operating contracts. The clause at... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Special construction...

  9. 48 CFR 970.3605-2 - Special construction clause for operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605-2 Special construction clause for operating contracts. The clause at... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special construction...

  10. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... preclude START contractors from performing construction management services under other EPA contracts. (3... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and...

  11. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... preclude START contractors from performing construction management services under other EPA contracts. (3... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and... Contracting Officer. Examples of such contracts include, but are not limited to, Superfund Management and...

  12. 48 CFR 47.505 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...

  13. 48 CFR 47.505 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...

  14. 48 CFR 47.505 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...

  15. 48 CFR 47.505 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...

  16. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  17. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  18. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  19. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 49.305-2 Section 49.305-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for...

  20. 41 CFR 102-76.10 - What basic design and construction policy governs Federal agencies?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What basic design and construction policy governs Federal agencies? 102-76.10 Section 102-76.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL...

  1. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  2. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  3. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  4. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What are design and construction services? 102-76.15 Section 102-76.15 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  5. 41 CFR 102-76.45 - What procedures must Federal agencies follow to implement the requirements of NEPA?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What procedures must...

  6. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  7. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  8. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  9. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  10. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  11. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  12. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  13. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  14. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the purpose of...

  15. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the purpose of...

  16. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the purpose of...

  17. 41 CFR 102-76.35 - What is the purpose of the National Environmental Policy Act of 1969, as amended (NEPA)?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction National Environmental... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the purpose of...

  18. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  19. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  20. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  1. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  2. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  3. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  4. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  5. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  6. 5 CFR 1315.14 - Payments under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Payments under construction contracts. 1315.14 Section 1315.14 Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET OMB DIRECTIVES PROMPT PAYMENT § 1315.14 Payments under construction contracts. (a) Payment standards. Agencies shall follow...

  7. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... associated with the management of the construction contract; and (4) In cases where the Indian tribe or..., accountants, and personnel who will provide construction management services; (2) The fees to be paid to... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.127 What can be included in the...

  8. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... associated with the management of the construction contract; and (4) In cases where the Indian tribe or..., accountants, and personnel who will provide construction management services; (2) The fees to be paid to... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.127 What can be included in the...

  9. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... associated with the management of the construction contract; and (4) In cases where the Indian tribe or..., accountants, and personnel who will provide construction management services; (2) The fees to be paid to... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.127 What can be included in the...

  10. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... associated with the management of the construction contract; and (4) In cases where the Indian tribe or..., accountants, and personnel who will provide construction management services; (2) The fees to be paid to... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.127 What can be included in the...

  11. Data exploration of social client relationship management (CRM 2.0) adoption in the Nigerian construction business.

    PubMed

    Ojelabi, Rapheal A; Afolabi, Adedeji O; Oyeyipo, Opeyemi O; Tunji-Olayeni, Patience F; Adewale, Bukola A

    2018-06-01

    Integrating social client relationship management (CRM 2.0) in the built environment can enhance the relationship between construction organizations and client towards sustaining a long and lasting collaboration. The data exploration analyzed the e-readiness of contracting and consulting construction firms in the uptake of CRM 2.0 and the barriers encountered in the adoption of the modern business tool. The targeted organizations consist of seventy five (75) construction businesses operating in Lagos State which were selected from a pool of registered contracting and consulting construction firms using random sampling technique. Descriptive statistics of the e-readiness of contracting and consulting construction firms for CRM 2.0 adoption and barriers limiting its uptake were analyzed. Also, inferential analysis using Mann-Whitney U statistical and independent sample t-test was performed on the dataset obtained. The data generated will support construction firms on the necessity to engage in client social relationship management in ensuring sustainable client relationship management in the built environment.

  12. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...

  13. 48 CFR 36.515 - Schedules for construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contemplated, the contract amount is expected to exceed the simplified acquisition threshold, and the period of... covering other management approaches for ensuring that a contractor makes adequate progress. [48 FR 42356... Schedules for construction contracts. The contracting officer may insert the clause at 52.236-15, Schedules...

  14. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  15. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  16. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  17. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  18. 41 CFR 60-300.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Purpose, applicability and construction. 60-300.1 Section 60-300.1 Public Contracts and Property Management Other Provisions... SUBCONTRACTORS REGARDING DISABLED VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED...

  19. 41 CFR 60-300.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Purpose, applicability and construction. 60-300.1 Section 60-300.1 Public Contracts and Property Management Other Provisions... SUBCONTRACTORS REGARDING DISABLED VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED...

  20. 48 CFR 342.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Contract Administration Office Functions 342.302 Contract administration..., contractor employees are considered “visitors.” Further, for any proposed or existing construction contract...

  1. 41 CFR 60-300.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Purpose, applicability and construction. 60-300.1 Section 60-300.1 Public Contracts and Property Management Other Provisions... FORCES SERVICE MEDAL VETERANS Preliminary Matters, Equal Opportunity Clause § 60-300.1 Purpose...

  2. 41 CFR 60-250.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Purpose, applicability and construction. 60-250.1 Section 60-250.1 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS Preliminary Matters, Equal Opportunity Clause § 60-250.1 Purpose, applicability...

  3. 41 CFR 60-250.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Purpose, applicability and construction. 60-250.1 Section 60-250.1 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS Preliminary Matters, Equal Opportunity Clause § 60-250.1 Purpose, applicability...

  4. 41 CFR 60-300.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Purpose, applicability and construction. 60-300.1 Section 60-300.1 Public Contracts and Property Management Other Provisions... FORCES SERVICE MEDAL VETERANS Preliminary Matters, Equal Opportunity Clause § 60-300.1 Purpose...

  5. 41 CFR 60-250.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Purpose, applicability and construction. 60-250.1 Section 60-250.1 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS Preliminary Matters, Equal Opportunity Clause § 60-250.1 Purpose, applicability...

  6. 41 CFR 60-250.1 - Purpose, applicability and construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Purpose, applicability and construction. 60-250.1 Section 60-250.1 Public Contracts and Property Management Other Provisions... OTHER PROTECTED VETERANS Preliminary Matters, Equal Opportunity Clause § 60-250.1 Purpose, applicability...

  7. 25 CFR 900.127 - What can be included in the Indian tribe or tribal organization's contract budget?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... which phase (see § 900.112) of the construction process the Indian tribe or tribal organization is... associated with the management of the construction contract; and (4) In cases where the Indian tribe or... construction contract to make a reasonable profit, taking into consideration the risks associated with carrying...

  8. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  9. 41 CFR 105-53.147 - Public Buildings Service.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for the design, construction, management, maintenance, operation, alteration, extension, remodeling... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Public Buildings Service. 105-53.147 Section 105-53.147 Public Contracts and Property Management Federal Property Management...

  10. 41 CFR 105-53.147 - Public Buildings Service.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... for the design, construction, management, maintenance, operation, alteration, extension, remodeling... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Public Buildings Service. 105-53.147 Section 105-53.147 Public Contracts and Property Management Federal Property Management...

  11. 41 CFR 105-53.147 - Public Buildings Service.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the design, construction, management, maintenance, operation, alteration, extension, remodeling... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Public Buildings Service. 105-53.147 Section 105-53.147 Public Contracts and Property Management Federal Property Management...

  12. 41 CFR 105-53.147 - Public Buildings Service.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... for the design, construction, management, maintenance, operation, alteration, extension, remodeling... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Public Buildings Service. 105-53.147 Section 105-53.147 Public Contracts and Property Management Federal Property Management...

  13. 48 CFR 49.105-4 - Cleanup of construction site.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cleanup of construction site. 49.105-4 Section 49.105-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105-4 Cleanup of construction site. In...

  14. 41 CFR 102-74.150 - Who submits prospectuses for the construction or alteration of public buildings to the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 102-74.150 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Asset... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who submits prospectuses...

  15. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    PubMed

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  16. 41 CFR 102-76.50 - What is sustainable development?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is sustainable development? 102-76.50 Section 102-76.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design...

  17. 41 CFR 102-76.50 - What is sustainable development?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is sustainable development? 102-76.50 Section 102-76.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design...

  18. 24 CFR 880.609 - Adjustment of contract rents.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon...

  19. 24 CFR 880.609 - Adjustment of contract rents.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon...

  20. 24 CFR 880.609 - Adjustment of contract rents.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon...

  1. 24 CFR 880.609 - Adjustment of contract rents.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon...

  2. 24 CFR 880.609 - Adjustment of contract rents.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon...

  3. 77 FR 29537 - Community Facility Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... alternate contracting method projects must comply with the requirements for ``maximum open and free... of alternate construction contract methods (such as Design/Build and Construction Management) by the.... Further, these changes will give all applicants greater flexibility in developing projects. Therefore, a...

  4. Final Report on the Audit of Architect-Engineer Contracting at the Officer in Charge of Construction, Naval Facilities Engineering Command Contracts, Mediterranean, Madrid, Spain

    DTIC Science & Technology

    1990-11-30

    This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include

  5. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What sustainable...? 102-76.55 Section 102-76.55 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design...

  6. 41 CFR 102-76.50 - What is sustainable development?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is sustainable development? 102-76.50 Section 102-76.50 Public Contracts and Property Management Federal Property Management... and Construction Sustainable Development § 102-76.50 What is sustainable development? Sustainable...

  7. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  8. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  9. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  10. 48 CFR 846.471 - Determination authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 846.471 Determination authority. The... Construction and Facilities Management, for those items and services for which purchase authority has been assigned to the Office of Construction and Facilities Management. (b) The Director, Veterans Canteen...

  11. 48 CFR 247.573-1 - Ocean transportation incidental to a contract for supplies, services, or construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business Management Directorate, MSC; or (ii) The Commander, Military Surface Deployment and Distribution... Commander, MSC, through the Contracts and Business Management Directorate, MSC; or (B) The Commander... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 247.573-1 Ocean transportation incidental...

  12. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  13. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  14. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  15. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... management services, these services shall be limited to: (1) Coordination and exchange of information between... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN...

  16. 48 CFR 36.303-2 - Phase Two.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... potential phase-two technical evaluation factors include design concepts, management approach, key personnel... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection...

  17. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  18. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  19. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  20. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  1. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  2. 48 CFR 247.573-1 - Ocean transportation incidental to a contract for supplies, services, or construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Ocean transportation... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 247.573-1 Ocean transportation incidental to a contract for supplies, services, or construction. (a) This subsection applies when ocean...

  3. 48 CFR 247.573-1 - Ocean transportation incidental to a contract for supplies, services, or construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Ocean transportation... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 247.573-1 Ocean transportation incidental to a contract for supplies, services, or construction. (a) This subsection applies when ocean...

  4. 48 CFR 247.573-1 - Ocean transportation incidental to a contract for supplies, services, or construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Ocean transportation... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 247.573-1 Ocean transportation incidental to a contract for supplies, services, or construction. (a) This subsection applies when ocean...

  5. 48 CFR 247.573-1 - Ocean transportation incidental to a contract for supplies, services, or construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Ocean transportation... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 247.573-1 Ocean transportation incidental to a contract for supplies, services, or construction. (a) This subsection applies when ocean...

  6. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction services are— (a) Site planning and landscape design; (b) Architectural and interior design; and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are design and... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  7. 48 CFR 836.602-1 - Selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-1... management, and cooperativeness. (2) Record of significant claims against the firm because of improper or...

  8. 48 CFR 836.602-1 - Selection criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-1... management, and cooperativeness. (2) Record of significant claims against the firm because of improper or...

  9. 48 CFR 836.602-1 - Selection criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-1... management, and cooperativeness. (2) Record of significant claims against the firm because of improper or...

  10. 78 FR 12755 - Federal Acquisition Regulation; Submission for OMB Review; Schedules for Construction Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Paperwork Reduction Act, the Regulatory Secretariat will be submitting to the Office of Management and... contract when other management approaches for ensuring adequate progress are not used. If the Contractor... extension of the information collection would violate the fundamental purpose of the Paperwork Reduction Act...

  11. 41 CFR 60-4.1 - Scope and application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Scope and application. 60-4.1 Section 60-4.1 Public Contracts and Property Management Other Provisions Relating to Public... 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.1 Scope and application. This part...

  12. 41 CFR 60-4.7 - Effect on other regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Effect on other regulations. 60-4.7 Section 60-4.7 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.7 Effect on other...

  13. CVal: a spreadsheet tool to evaluate the direct benefits and costs of carbon sequestration contracts for managed forests

    Treesearch

    E.M. Bilek; Peter Becker; Tim. McAbee

    2009-01-01

    This documentation is meant to accompany CVal, a downloadable spreadsheet tool. CVal was constructed for foresters, other land management advisors, landowners, and carbon credit aggregators to evaluate the direct benefits and costs of entering into contracts for carbon sequestered in managed forests and forest plantations. CVal was designed to evaluate Exchange...

  14. Contract management techniques for improving construction quality

    DOT National Transportation Integrated Search

    1997-07-01

    Efforts to improve quality in highway construction embrace many aspects of the construction process. Quality goals include enhanced efficiency and productivity, optimal cost and delivery time, improved performance, and changes in attitude-promoting a...

  15. Analysis of Air Force Wartime Contracted Construction Project Performance

    DTIC Science & Technology

    2015-03-26

    Management, Volume 140. Branconi, C. v. & Loch, C. H., 2004. Contracting for major projects: eight business levers for top management. International ...Problems X Material Supply Problems X Poor Owner Management X X Poor Contractor Management X Corruption and Bribery X The USACE survey...Kremers, et al., 2010; GAO, 2014; Thibault, 2011). The final difference, corruption and bribery , was mentioned in the USACE study as well as by Kremers

  16. United States Special Operations Command (USSOCOM): Construction Management Handbook

    DTIC Science & Technology

    2010-02-11

    installation B-Hut Road Work Sea-Hut Water Well and Pump House Brick and Mortar billets D. Oversight Program Oversight of contracts is critical to the...often asked to fulfill construction requirements in austere locations with little or no training in construction terminology, concepts, and protocols...contracting arm of SOAL is the Director of Procurement (also known as SOAL-K), located within the USSOCOM Headquarters on MacDill AFB, Florida. SOAL-K

  17. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  18. 'Commitment' secures rooftop SSD contract.

    PubMed

    Davies, John

    2010-01-01

    John Davies, operations manager of multi-disciplinary mechanical and electrical and construction contractor cfes, describes a "turnkey" project that the company is undertaking for the Yeovil District Hospital (YDH) NHS Foundation Trust, involving both the design and construction of a new sterile services department, and substantial input into the facility's subsequent operation and management.

  19. 48 CFR 801.602-78 - Processing solicitations and contract documents for legal or technical review-Veterans Health...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center... facilities, Central Office (except Office of Construction and Facilities Management), the National... takes exception to the accord and satisfaction language VA specifies, assignment of claims, changes to...

  20. 48 CFR 32.103 - Progress payments under construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor during any period for which a progress payment is to be made, a percentage of the progress payment may be retained. Retainage should not be used as a substitute for good contract management, and the contracting officer should not withhold funds without cause. Determinations to retain and the specific amount...

  1. 23 CFR Appendix A to Subpart B of... - Types of Contracts to Which the Civil Rights Act of 1964 Is Applicable

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS REQUIRED CONTRACT PROVISIONS Federal-Aid.... Construction. 2. Planning. 3. Research. 4. Highway Safety. 5. Engineering. 6. Property Management. 7. Fee...

  2. 48 CFR 801.602-84 - Documents to submit for business clearance reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career... reviews. A contracting officer must submit to Acquisition Resources Service (Office of Construction and Facilities Management and National Cemetery Administration contracting officers shall forward the documents...

  3. Guidelines for Selecting a Construction Approach for Education Building Programs.

    ERIC Educational Resources Information Center

    Barton Malow Co., Southfield, MI.

    This book discusses the advantages and disadvantages of the two most common construction planning methods utilized for educational facilities: general contracting and construction management. Diagrams are provided that illustrate the chain of command and communication within each approach, and highlight considerations that every school district…

  4. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  5. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  6. 24 CFR 880.612 - Reviews during management period.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Reviews during management period... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.612 Reviews during management period. (a) After the effective date of the Contract, the...

  7. 24 CFR 880.612 - Reviews during management period.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Reviews during management period... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.612 Reviews during management period. (a) After the effective date of the Contract, the...

  8. 24 CFR 880.612 - Reviews during management period.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Reviews during management period... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.612 Reviews during management period. (a) After the effective date of the Contract, the...

  9. 24 CFR 880.612 - Reviews during management period.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Reviews during management period... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.612 Reviews during management period. (a) After the effective date of the Contract, the...

  10. 24 CFR 880.612 - Reviews during management period.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Reviews during management period... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.612 Reviews during management period. (a) After the effective date of the Contract, the...

  11. 41 CFR 102-74.140 - On what basis does the Administrator select construction and alteration projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Asset Services § 102-74.140 On what basis... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false On what basis does the...

  12. Kansas City Metropolitan Community Colleges. Audit Report.

    ERIC Educational Resources Information Center

    Missouri Office of the State Auditor, Jefferson City.

    This audit report reviews the employment contracts, related compensation, and other benefits provided for the chancellor and other officers of the Kansas City Metropolitan Community Colleges (KCMCC) in Missouri. The chancellor is allowed to either solicit bids or negotiate for contracted services such as architects, construction managers,…

  13. Port Granby Project Overview - 13208

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, David W.; Vandergaast, Gary; Sungaila, Mark

    2013-07-01

    The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less

  14. 41 CFR 102-76.65 - What standards must facilities subject to the Architectural Barriers Act meet?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What standards must... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.65 What standards...

  15. 41 CFR 102-76.65 - What standards must facilities subject to the Architectural Barriers Act meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What standards must... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.65 What standards...

  16. 41 CFR 102-76.65 - What standards must facilities subject to the Architectural Barriers Act meet?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What standards must... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.65 What standards...

  17. 41 CFR 102-76.65 - What standards must facilities subject to the Architectural Barriers Act meet?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What standards must... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.65 What standards...

  18. 41 CFR 102-76.65 - What standards must facilities subject to the Architectural Barriers Act meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What standards must... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.65 What standards...

  19. 41 CFR 102-76.10 - What basic design and construction policy governs Federal agencies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What basic design and... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL... must be timely, efficient, and cost effective. (b) Use a distinguished architectural style and form in...

  20. UAS Integration in the NAS Project Test Site Kick-off Meeting

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  1. NATO Phase Zero Contracting - A Proposed Strategic and Operational Planning Construct Within the NATO Framework for Defense Planning and Standardization

    DTIC Science & Technology

    2015-02-12

    become better stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational...stewards of scarce resources, to eliminate potential waste, and to reduce abuse of taxpayer money due to poor management, operational redundancy and...Conference—Best Practices and Lessons Learned and Training and Educating for Acquisition, Procurement and Contracting in Defense Institutions

  2. Characterizing Patterns of MILCON Project Contract Modifications

    DTIC Science & Technology

    2007-12-01

    overtime and over manning), the amount of change, absenteeism and turnover, manpower increase over planned levels, and the processing time from the...S., & Vandenberg, P. J. (1999). The impact of change orders on mechanical construction labour efficiency. Construction Management & Economics, 17(6

  3. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... development from establishment of the development team to operation and management of the development project... component, the developer should give consideration to creating business and employment opportunities and... connection with construction and operation; (4) Contracting for construction, operation, and maintenance; and...

  4. UTILITY DATA ARCHIVING FOR RISK MANAGEMENT

    EPA Science Inventory

    EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...

  5. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  6. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  7. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  8. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  9. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  10. 48 CFR 243.204-70-5 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-5 Exceptions. (a) The limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 do not apply to unpriced change orders... change orders for ship construction and ship repair. (c) The head of the agency may waive the limitations...

  11. Managing commodity risks in highway contracts : quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts.

    DOT National Transportation Integrated Search

    2011-09-01

    It is a well-known fact that macro-economic conditions, such as prices of commodities (e.g. oil, : cement and steel) affect the cost of construction projects. In a volatile market environment, highway : agencies often pass such risk to contractors us...

  12. 48 CFR 243.204-70-5 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-5 Exceptions. (a) The limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 do not apply to unpriced change orders... change orders for ship construction and ship repair. (c) The head of the agency may waive the limitations...

  13. 25 CFR 170.500 - What program reviews do the Secretaries conduct?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...

  14. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction...

  15. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction...

  16. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  17. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  18. 48 CFR 846.710-71 - Warranty for construction-guarantee period services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Warranty for construction-guarantee period services. 846.710-71 Section 846.710-71 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710-71 Warranty for...

  19. 48 CFR 811.602 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirement as stated in the solicitation or offer. (6) The additional time the contractor claims is necessary... materials. (8) If applicable, a statement that the item required is for use in a construction contract that was authorized by the Director, Office of Construction and Facilities Management, to be awarded and...

  20. 48 CFR 811.602 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... requirement as stated in the solicitation or offer. (6) The additional time the contractor claims is necessary... materials. (8) If applicable, a statement that the item required is for use in a construction contract that was authorized by the Director, Office of Construction and Facilities Management, to be awarded and...

  1. 48 CFR 801.670-4 - National Cemetery Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Authority, and Responsibilities 801.670-4 National Cemetery Administration. The Director of Logistics Management Service, the Centralized Contracting Division, and the Construction Support Division are...

  2. 48 CFR 1446.170 - Government-Industry Data Exchange Program (GIDEP).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR CONTRACT MANAGEMENT QUALITY ASSURANCE General 1446.170 Government-Industry Data Exchange... construction materials), manufacturing processes, environmental issues associated with those manufacturing...

  3. 41 CFR 102-76.90 - Who has the authority to waive or modify the standards in § 102-76.65(a)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Who has the authority to... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.90 Who has the...

  4. 41 CFR 102-76.90 - Who has the authority to waive or modify the standards in § 102-76.65(a)?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Who has the authority to... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.90 Who has the...

  5. 41 CFR 102-76.90 - Who has the authority to waive or modify the standards in § 102-76.65(a)?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Who has the authority to... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.90 Who has the...

  6. 41 CFR 102-76.90 - Who has the authority to waive or modify the standards in § 102-76.65(a)?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Who has the authority to... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.90 Who has the...

  7. 41 CFR 102-76.90 - Who has the authority to waive or modify the standards in § 102-76.65(a)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who has the authority to... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.90 Who has the...

  8. 41 CFR 101-19.0 - Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220). 101-19.0 Section 101-19.0 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS PUBLIC BUILDINGS AND SPACE 19-CONSTRUCTION AND ALTERATION OF PUBLIC BUILDINGS § 101-19...

  9. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  10. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  11. 24 CFR 880.605 - Overcrowded and underoccupied units.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.605 Overcrowded and underoccupied units. If the contract administrator determines that...

  12. 24 CFR 880.605 - Overcrowded and underoccupied units.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.605 Overcrowded and underoccupied units. If the contract administrator determines that...

  13. 24 CFR 880.605 - Overcrowded and underoccupied units.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.605 Overcrowded and underoccupied units. If the contract administrator determines that...

  14. 24 CFR 880.605 - Overcrowded and underoccupied units.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM FOR NEW CONSTRUCTION Management § 880.605 Overcrowded and underoccupied units. If the contract administrator determines that...

  15. 41 CFR 102-76.50 - What is sustainable development?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... development? 102-76.50 Section 102-76.50 Public Contracts and Property Management Federal Property Management... and Construction Sustainable Development § 102-76.50 What is sustainable development? Sustainable development means integrating the decision-making process across the organization, so that every decision is...

  16. 7 CFR 1724.21 - Architectural services contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the architect furnishes or obtains all architectural services related to the design and construction management of the facilities. (c) Reasonable modifications or additions to the terms and conditions in the...

  17. 7 CFR 1724.21 - Architectural services contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the architect furnishes or obtains all architectural services related to the design and construction management of the facilities. (c) Reasonable modifications or additions to the terms and conditions in the...

  18. 7 CFR 1724.21 - Architectural services contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the architect furnishes or obtains all architectural services related to the design and construction management of the facilities. (c) Reasonable modifications or additions to the terms and conditions in the...

  19. 7 CFR 1724.21 - Architectural services contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the architect furnishes or obtains all architectural services related to the design and construction management of the facilities. (c) Reasonable modifications or additions to the terms and conditions in the...

  20. Study on Collaborative SCM of Construction Enterprises Based on Information-Sharing

    NASA Astrophysics Data System (ADS)

    Wang, Lianyue

    Economic globalization and the integration process has led to competition among construction enterprises become increasingly fierce, which are adjusting their development strategies and efforts to seek for the knowledge economy and network environment to promote enterprise survival and development, enhancing the competitiveness of enterprises in the new business management models and ideas. This paper first discussed the concept of the supply chain collaboration of the construction enterprise and constituted a information management platform of the general contracting project. At last, the paper puts forward tactics which aims at helping construction enterprises realize supply chain collaboration and enhance the competitiveness of enterprises.

  1. Managing Productivity.

    DTIC Science & Technology

    1985-01-01

    could be a small construction , management firm, where project managers keep track of all phases and evolutions of contracts by hand. An obvious polution ...overview of productivity measurement. This idea can be expanded much further with the concept of productivity audits . Productivity auditing is a...comprehensive procedure, not unlike traditional audit practices which monitors and evaluates organizational practices to determine whether functional units

  2. 10 CFR Appendix C to Subpart D of... - Classes of Actions that Normally Require EAs But Not Necessarily EISs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../construction/operation of energy system prototypes C13. Import/export natural gas, minor new construction... Marketing Administration system-wide vegetation management program. C6Implementation of a Power Marketing Administration system-wide erosion control program. C7Establishment and implementation of contracts, policies...

  3. 41 CFR 101-5.104-4 - Scheduling feasibility studies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... studies. 101-5.104-4 Section 101-5.104-4 Public Contracts and Property Management Federal Property... FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-4 Scheduling feasibility studies. The schedule of feasibility studies will be coordinated by GSA with its construction, space management, and buildings...

  4. 41 CFR 101-5.104-4 - Scheduling feasibility studies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... studies. 101-5.104-4 Section 101-5.104-4 Public Contracts and Property Management Federal Property... FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-4 Scheduling feasibility studies. The schedule of feasibility studies will be coordinated by GSA with its construction, space management, and buildings...

  5. 41 CFR 101-19.0 - Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MANAGEMENT REGULATIONS PUBLIC BUILDINGS AND SPACE 19-CONSTRUCTION AND ALTERATION OF PUBLIC BUILDINGS § 101-19... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220). 101-19.0 Section 101-19.0...

  6. 41 CFR 101-19.0 - Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT REGULATIONS PUBLIC BUILDINGS AND SPACE 19-CONSTRUCTION AND ALTERATION OF PUBLIC BUILDINGS § 101-19... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220). 101-19.0 Section 101-19.0...

  7. 41 CFR 101-19.0 - Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MANAGEMENT REGULATIONS PUBLIC BUILDINGS AND SPACE 19-CONSTRUCTION AND ALTERATION OF PUBLIC BUILDINGS § 101-19... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220). 101-19.0 Section 101-19.0...

  8. 41 CFR 101-19.0 - Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT REGULATIONS PUBLIC BUILDINGS AND SPACE 19-CONSTRUCTION AND ALTERATION OF PUBLIC BUILDINGS § 101-19... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Cross-reference to the Federal Management Regulation (FMR) 41 CFR chapter 102 parts 1 through 220). 101-19.0 Section 101-19.0...

  9. Evaluation of agreements between managed care organizations and providers of community-based mental illness and addiction disorder treatments.

    PubMed

    Rosenbaum, Sara; Mauery, D Richard; Teitelbaum, Joel; Vandivort-Warren, Rita

    2002-02-01

    To analyze the scope, content, and nature of contracts between managed care organizations (MCOs) and community-based mental illness and addiction disorder treatment and prevention service providers, focusing on implications for managed care policy. Qualitative and quantitative document content analysis. We reviewed and coded 107 provider contracts from 17 states. Data were aggregated on MCO and provider demographics, scope of services, contractual obligations, and financial reimbursement mechanisms. Results were compared with those from a similar study conducted in 1996 with a sample of 50 contracts to identify changes over time. The MCOs purchased relatively few services from providers, omitting many services integral to the proper management of mental illness and addiction disorders. Service duties were often ambiguously described, leading to potentially significant and unanticipated financial risk for providers. The MCOs exert strong control over treatment decision making. Capitation and other risk-based payment arrangements are increasingly common, although most continue to use fee-for-service reimbursement methods. Contracts are structured to remove provider bargaining power; they allow MCOs to unilaterally amend all provisions on notice and without negotiation and permit termination "at will." Managed care contracts favor the needs of the managed care industry and are constructed to (1) shift significant amounts of financial risk onto providers and (2) manage and restrain providers' choices over the use of benefits through close oversight, financial controls, and incentives. Because a signed contract is a precondition to access to patients and insurance revenues, health professionals must sign them and indicate a general inability to negotiate their terms.

  10. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  11. 48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...

  12. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  13. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  14. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  15. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A contract for the construction or substantial rehabilitation of a hospital shall be entered into by a...

  16. Setting Whole-Building Absolute Energy Use Targets for the K-12 School, Retail, and Healthcare Sectors: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leach, M.; Bonnema, E.; Pless, S.

    2012-08-01

    This paper helps owners' efficiency representatives to inform executive management, contract development, and project management staff as to how specifying and applying whole-building absolute energy use targets for new construction or renovation projects can improve the operational energy performance of commercial buildings.

  17. 48 CFR 1436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...

  18. 48 CFR 436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...

  19. 48 CFR 1436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...

  20. 48 CFR 1436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...

  1. 48 CFR 436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...

  2. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  3. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...

  4. 48 CFR 436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...

  5. 48 CFR 436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...

  6. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  7. 48 CFR 436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...

  8. 48 CFR 1436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...

  9. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...

  10. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...

  11. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer firms. (a...

  12. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  13. 48 CFR 1436.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...

  14. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  15. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...

  16. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  17. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  18. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  19. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  20. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  1. Quantitative option analysis for implementation and management of landfills.

    PubMed

    Kerestecioğlu, Merih

    2016-09-01

    The selection of the most feasible strategy for implementation of landfills is a challenging step. Potential implementation options of landfills cover a wide range, from conventional construction contracts to the concessions. Montenegro, seeking to improve the efficiency of the public services while maintaining affordability, was considering privatisation as a way to reduce public spending on service provision. In this study, to determine the most feasible model for construction and operation of a regional landfill, a quantitative risk analysis was implemented with four steps: (i) development of a global risk matrix; (ii) assignment of qualitative probabilities of occurrences and magnitude of impacts; (iii) determination of the risks to be mitigated, monitored, controlled or ignored; (iv) reduction of the main risk elements; and (v) incorporation of quantitative estimates of probability of occurrence and expected impact for each risk element in the reduced risk matrix. The evaluated scenarios were: (i) construction and operation of the regional landfill by the public sector; (ii) construction and operation of the landfill by private sector and transfer of the ownership to the public sector after a pre-defined period; and (iii) operation of the landfill by the private sector, without ownership. The quantitative risk assessment concluded that introduction of a public private partnership is not the most feasible option, unlike the common belief in several public institutions in developing countries. A management contract for the first years of operation was advised to be implemented, after which, a long term operating contract may follow. © The Author(s) 2016.

  2. 48 CFR 36.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...

  3. 48 CFR 636.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...

  4. 48 CFR 636.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...

  5. 48 CFR 636.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...

  6. 48 CFR 636.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...

  7. 48 CFR 36.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...

  8. 48 CFR 636.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...

  9. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As required by FAR...

  10. 48 CFR 36.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...

  11. 48 CFR 36.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...

  12. 48 CFR 36.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...

  13. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  14. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  15. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  16. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  17. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  18. Critical analysis of procurement techniques in construction management sectors

    NASA Astrophysics Data System (ADS)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  19. Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies in infrastructure construction project management and delay and disruption analysis

    NASA Astrophysics Data System (ADS)

    Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos

    2015-06-01

    Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.

  20. Expert Systems in Contract Management. A Pilot Study.

    DTIC Science & Technology

    1985-10-01

    and appropriately selected .1 ~..they can provide valuable assistance to managers in their tasks of planning and control. If these techniques are to ...the programs that would affect their relevance -> . to construction management applications in general. We also ascertained which programs have... further experience of SAVOIR applied in a fairly complex real-world domain This has, in their view, confirmed the suitability of SAVOIR for the domain

  1. 78 FR 21623 - Public Housing Assessment System (PHAS): Capital Fund Final Scoring Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... PHAs from making improvements to the nation's aging stock and unfairly punishes PHAs for well-managed... that PHAs with active and on-schedule construction contracts should be able to exclude vacancies for...

  2. 41 CFR 102-76.25 - What standards must Federal agencies meet in providing architectural and interior design services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued... accordance with the standards in § 102-76.65. (c) Use metric specifications in construction where the metric system is the accepted industry standard, and to the extent that such usage is economically feasible and...

  3. 41 CFR 102-76.25 - What standards must Federal agencies meet in providing architectural and interior design services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued... accordance with the standards in § 102-76.65. (c) Use metric specifications in construction where the metric system is the accepted industry standard, and to the extent that such usage is economically feasible and...

  4. 41 CFR 102-76.25 - What standards must Federal agencies meet in providing architectural and interior design services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued... accordance with the standards in § 102-76.65. (c) Use metric specifications in construction where the metric system is the accepted industry standard, and to the extent that such usage is economically feasible and...

  5. 41 CFR 102-76.25 - What standards must Federal agencies meet in providing architectural and interior design services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued... accordance with the standards in § 102-76.65. (c) Use metric specifications in construction where the metric system is the accepted industry standard, and to the extent that such usage is economically feasible and...

  6. School Building Projects: Managing Insurance and Contracts during Construction

    ERIC Educational Resources Information Center

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  7. 77 FR 73659 - Federal Acquisition Regulation; Information Collection; Schedules for Construction Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...; Information Collection; Schedules for Construction Contracts AGENCIES: Department of Defense (DOD), General... approved information collection requirement concerning schedules for construction contracts. Public...: Submit comments identified by Information Collection 9000- 0058, Schedules for Construction Contracts by...

  8. KSC-2011-1154

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  9. KSC-2011-1155

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  10. Bid opening report : Federal-aid highway construction contracts : first six months 1998

    DOT National Transportation Integrated Search

    1999-07-01

    This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...

  11. 48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...

  12. 41 CFR 301-70.506 - How do we define actual cost and constructive cost when an employee interrupts a travel...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...

  13. 41 CFR 301-70.506 - How do we define actual cost and constructive cost when an employee interrupts a travel...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...

  14. 41 CFR 301-70.506 - How do we define actual cost and constructive cost when an employee interrupts a travel...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...

  15. 41 CFR 301-70.506 - How do we define actual cost and constructive cost when an employee interrupts a travel...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...

  16. 41 CFR 301-70.506 - How do we define actual cost and constructive cost when an employee interrupts a travel...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...

  17. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  18. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  19. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (MAY 2014) (a) Payment of...

  20. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  1. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  2. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  3. Contractor’s Handbook for Construction Contracts

    DTIC Science & Technology

    1988-01-01

    of imprisonment. 66 I 11. Emploment of Minors on Construction Contracts. On construction contracts, child labor requirements for non agricultural...occupations are governed by the Fair Labor Standards Act, Wage and 1 Hour Division. 67 Oppressive child labor is defined as employment of children under...Contracts. On construction contracts, child labor requirements for non agricultural 3 occupations are governed by the Fair Labor Standards Act, Wage and

  4. Risk factors for injury among construction workers at Denver International Airport.

    PubMed

    Lowery, J T; Borgerding, J A; Zhen, B; Glazner, J E; Bondy, J; Kreiss, K

    1998-08-01

    The Denver International Airport construction project provided a rare opportunity to identify risk factors for injury on a large construction project for which 769 contractors were hired to complete 2,843 construction contracts. Workers' compensation claims and payroll data for individual contracts were recorded in an administrative database developed by the project's Owner-Controlled Insurance Program. From claims andy payroll data linked with employee demographic information, we calculated injury rates per 200,000 person-hours by contract and over contract characteristics of interest. We used Poisson regression models to examine contract-specific risk factors in relation to total injuries, lost-work-time (LWT), and non-LWT injuries. We included contract-specific expected loss rates (ELRs) in the model to control for prevailing risk of work and used logistic regression methods to determine the association between LWT and non-LWT injuries on contracts. Injury rates were highest during the first year of construction, at the beginning of contracts, and among older workers. Risk for total and non-LWT injuries was elevated for building construction contracts, contract for special trades companies (SIC 17), contracts with payrolls over $1 million, and those with overtime payrolls greater than 20%. Risk for LWT injuries only was increased for site development contracts and contract starting in the first year of construction. Contracts experiencing one or more minor injuries were four times as likely to have at least one major injury (OR = 4.0, 95% CI (2.9, 5.5)). Enhancement of DIA's safety infrastructure during the second year of construction appears to have been effective in reducing serious (LWT) injures. The absence of correlation between injury rates among contracts belonging to the same company suggest that targeting of safety resources at the level of the contract may be an effective approach to injury prevention. Interventions focused on high-risk contracts, including those with considerable overtime work, contracts held by special trades contractors (SIC 17), and contracts belonging to small and mid-sized companies, and on high-risk workers, such as those new to a construction site or new to a contract may reduce injury burden on large construction sites. The join occurrence of minor and major injuries on a contract level suggests that surveillance of minor injuries may be useful in identifying opportunities for prevention of major injures.

  5. VA Construction: Improved Processes Needed to Monitor Contract Modifications, Develop Schedules, and Estimate Costs

    DTIC Science & Technology

    2017-03-01

    address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing

  6. BIM: Enabling Sustainability and Asset Management through Knowledge Management

    PubMed Central

    2013-01-01

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry. PMID:24324392

  7. BIM: enabling sustainability and asset management through knowledge management.

    PubMed

    Kivits, Robbert Anton; Furneaux, Craig

    2013-11-10

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry.

  8. 48 CFR 236.275 - Construction of industrial resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Construction of industrial... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 236.275 Construction of industrial resources. See...

  9. 48 CFR 236.275 - Construction of industrial resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Construction of industrial... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 236.275 Construction of industrial resources. See...

  10. 78 FR 52005 - 30-Day Notice of Proposed Information Collection: Multifamily Project Construction Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...

  11. A Study of Construction Contract Delay; Causes and Impacts.

    DTIC Science & Technology

    1987-08-01

    industry-wide, lack of use of state of the art management systems for schedule and cost control , and a general lack of owner attention to contract...all barriers contractually required for a contractor to proceed, or by an outside force which neither party can control . Serial delay is a "linkage" or...maJeure’ causes, or acts of God, and those caused by outside forces. Unforeseen conditions are beyond the control of the related parties, and are not

  12. 48 CFR 228.102-70 - Defense Environmental Restoration Program construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Restoration Program construction contracts. 228.102-70 Section 228.102-70 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds 228.102-70 Defense Environmental Restoration Program construction contracts...

  13. Lessons Learned from the Construction of Upgrades to the NASA Glenn Icing Research Tunnel and Re-activation Testing

    NASA Technical Reports Server (NTRS)

    Sheldon, David W.; Andracchio, Charles R.; Krivanek, Thomas M.; Spera, David A.; Austinson, Todd A.

    2001-01-01

    Major upgrades were made in 1999 to the 6- by 9-Foot (1.8- by 2.7-m) Icing Research Tunnel (IRT) at the NASA Glenn Research Center. These included replacement of the electronic controls for the variable-speed drive motor, replacement of the heat exchanger, complete replacement and enlargement of the leg of the tunnel containing the new heat-exchanger, the addition of flow-expanding and flow-contracting turning vanes upstream and downstream of the heat exchanger, respectively, and the addition of fan outlet guide vanes (OGV's). This paper presents an overview of the construction and reactivation testing phases of the project. Important lessons learned during the technical and contract management work are documented.

  14. Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department of Transportation

    DOT National Transportation Integrated Search

    2001-10-01

    Public agencies across the country are pursuing innovative project delivery methods such as design-build (D-B) and construction manager-at-risk (CM-at-risk) to improve cycle-time performance on projects, and numerous transportation departments are cu...

  15. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  16. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  17. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  18. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  19. 26 CFR 1.460-3 - Long-term construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... construction contracts. (a) In general. Section 460 generally requires a taxpayer to determine the income from... not real property. (b) Exempt construction contracts—(1) In general. The general requirement to use...) of this section. (2) Home construction contract—(i) In general. A long-term construction contract is...

  20. Comparison of Navy and Private-Sector Construction Costs

    DTIC Science & Technology

    1997-09-01

    contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar

  1. 25 CFR 900.134 - At the end of a self-determination construction contract, what happens to savings on a cost...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...

  2. 25 CFR 900.134 - At the end of a self-determination construction contract, what happens to savings on a cost...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...

  3. 25 CFR 900.134 - At the end of a self-determination construction contract, what happens to savings on a cost...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...

  4. 25 CFR 900.134 - At the end of a self-determination construction contract, what happens to savings on a cost...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...

  5. 25 CFR 900.134 - At the end of a self-determination construction contract, what happens to savings on a cost...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...

  6. 24 CFR 200.52 - Construction contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contract. 200.52 Section 200.52 Housing and Urban Development Regulations Relating to Housing and Urban Development... Construction contract. The form of contract between the mortgagor and builder shall be as prescribed by the...

  7. 24 CFR 200.52 - Construction contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction contract. 200.52 Section 200.52 Housing and Urban Development Regulations Relating to Housing and Urban Development... Construction contract. The form of contract between the mortgagor and builder shall be as prescribed by the...

  8. 24 CFR 200.52 - Construction contract.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction contract. 200.52 Section 200.52 Housing and Urban Development Regulations Relating to Housing and Urban Development... Construction contract. The form of contract between the mortgagor and builder shall be as prescribed by the...

  9. 24 CFR 200.52 - Construction contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction contract. 200.52 Section 200.52 Housing and Urban Development Regulations Relating to Housing and Urban Development... Construction contract. The form of contract between the mortgagor and builder shall be as prescribed by the...

  10. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  11. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  12. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  13. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  14. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  15. 41 CFR 60-4.5 - Hometown plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Hometown plans. 60-4.5...-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.5 Hometown plans. (a) A contractor participating, either individually or through an association, in an approved Hometown Plan (including heavy...

  16. 48 CFR 22.404-12 - Labor standards for contracts containing construction requirements and option provisions that...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract price adjustment. An example of a contract pricing method that the contracting officer might... contracts containing construction requirements and option provisions that extend the term of the contract... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Labor Standards for Contracts...

  17. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  18. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  19. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  20. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  1. The Differing Site Conditions Clause: Time for a Change

    DTIC Science & Technology

    1990-09-30

    the character provided for in the contract. The provision of the standard construction contract utilized by agencies of the Federal Government which...unanticipated conditions otherwise attendant upon the performance of construction work.’ Differing site conditions pose a major concern to all I McNulty, "Changed...Conditions (Differing Site Conditions) and Misrepresentations Under Government Construction Contracts" in Construction Contract Changes, Changed

  2. 13 CFR 305.11 - Contract awards; early construction start.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract awards; early construction start. 305.11 Section 305.11 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... § 305.11 Contract awards; early construction start. EDA must determine that the award of all contracts...

  3. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  4. 13 CFR 305.11 - Contract awards; early construction start.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Contract awards; early construction start. 305.11 Section 305.11 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... § 305.11 Contract awards; early construction start. EDA must determine that the award of all contracts...

  5. 48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...

  6. 48 CFR 22.406-9 - Withholding from or suspension of contract payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Standards for Contracts Involving Construction 22.406-9 Withholding from or suspension of contract payments... contract with the same prime contractor that is subject to either Construction Wage Rate Requirements... contractor or subcontractor fails or refuses to comply with the labor standards clauses of the Construction...

  7. Statistical Acceptance Plan for Asphalt Pavement Construction.

    DTIC Science & Technology

    1998-05-01

    K. C, Freidenrich, J., and Weed, R. M. (1992). " Managing Qual- ity: Time for a National Policy," Transportation Research Record 1340...Baecher, G. (1987). "Statistical Qaulity Control of Engineered Embank- ments," Contract Report GL-87-2, Waterways Experiment Station, U.S. Army Corps...Arfington, VA22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0186). Washington, DC20503. 1 .AGENCY USE ONLY

  8. Management systems research study

    NASA Technical Reports Server (NTRS)

    Bruno, A. V.

    1975-01-01

    The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

  9. The "What," "Why" and "How" of Job Order Contracting (JOC). IssueTrak: A CEFPI Brief on Educational Facility Issues

    ERIC Educational Resources Information Center

    Jayne, Ken

    2004-01-01

    This "IssueTrak" discusses how facility planners and managers need an assortment of instruments in their toolbox so that they are able to select the best and most appropriate device for each project. A relatively new tool that should be at the disposal of all educational facility managers and planners is the construction delivery system of Job…

  10. H-Coal Pilot Plant Phase II construction, Catlettsburg, Kentucky. Final construction management report, December 1976-February 1980. [February, 1977 to approximately January, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-03-01

    This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less

  11. 48 CFR 970.2673-1 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Policy. 970.2673-1 Section... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Other Socioeconomic Programs 970.2673-1 Policy. It is the policy of the DOE to be a constructive partner in the geographic region in which DOE conducts its...

  12. 48 CFR 970.2673-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Policy. 970.2673-1 Section... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Other Socioeconomic Programs 970.2673-1 Policy. It is the policy of the DOE to be a constructive partner in the geographic region in which DOE conducts its...

  13. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Legal and technical review... 801.602-80 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and...

  14. 48 CFR 52.223-2 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Biobased Products Under Service and Construction Contracts. 52.223-2 Section 52.223-2 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. As prescribed in 23.406(b), insert the following clause: Affirmative...

  15. 48 CFR 32.904 - Determining payment due dates.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... is subject to contract settlement actions (e.g., release of claims), acceptance is deemed to occur on...) Construction contracts. (1) The due date for making payments on construction contracts is as follows: (i) The... by the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts. (ii) The due date for...

  16. 48 CFR 1336.270 - Special requirements for ship construction

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special requirements for ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1336.270 Special...

  17. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  18. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  19. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  20. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  1. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  2. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  3. 48 CFR 36.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...

  4. 48 CFR 36.102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...

  5. 48 CFR 36.102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...

  6. 48 CFR 36.102 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...

  7. 48 CFR 36.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS General 36.102 Definitions. As used in this part— Contract is intended to refer to a contract for construction or a contract for architect-engineer services..., structural, electrical, mechanical, and fire protection), producing the technical specifications and drawings...

  8. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  9. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  10. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  11. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  12. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  13. Implementation of warranties in state contracts for highway construction.

    DOT National Transportation Integrated Search

    2012-04-01

    In 1997, The Louisiana House of Representatives passed Bill Number 1698, which addresses warranties in state : contracts for highway construction. This bill stated that every contract for the construction of or improvements to : highways will include...

  14. Hospital materials managers need to be aware of actions that constitute legal acceptance.

    PubMed

    Decker, R

    1990-12-01

    A hospital invited bids for building materials for a hospital construction project. A supplier submitted a bid which asked the hospital to sign and return a trade association form contract. The hospital didn't return the form but used the supplier's bid as part of the general contract for the entire project and notified the supplier and the general contractor. Later, the supplier submitted a higher bid for the same material contending that the hospital hadn't accepted the first bid as they hadn't followed the instructions. The hospital materials manager feels that the bid was properly accepted. In this dialogue, Dr. Decker reviews the legal issues involved in the different ways of accepting an offer.

  15. 48 CFR 36.702 - Forms for use in contracting for architect-engineer services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...

  16. 48 CFR 36.702 - Forms for use in contracting for architect-engineer services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...

  17. 48 CFR 36.702 - Forms for use in contracting for architect-engineer services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...

  18. Implementation of warranties in state contracts for highway construction : tech summary.

    DOT National Transportation Integrated Search

    2012-04-01

    In 1997, The Louisiana House of Representatives passed Bill Number 1698, which addresses warranties in state contracts : for highway construction. This bill states that every contract for the construction of or improvements to highways will : include...

  19. Atlas/Data Abstract for the United States and Selected Areas: Fiscal Year 1988

    DTIC Science & Technology

    1988-01-01

    more than one plant, the contract has been attributed to the location where the largest dollar amount of work will be performed. Both construction and...67,322 170,367 44,068 123 Service Contracts 596,632 82,939 430,629 71,587 11,477 Construction Contracts 14,788 163 14,625 0 0 Civil Function Contracts...Contracts 151,308 16,972 7,680 5,040 121,616 R&D Contracts 15,559 8,513 2,997 4,049 0 Service Contracts 50,458 2,246 28,987 17,214 2,011 Construction

  20. 23 CFR Appendix C to Subpart B of... - Additional Required Contract Provisions, Appalachian Development Highway System and Local Access...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Additional Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts C Appendix C to..., Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts...

  1. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  2. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  3. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  4. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  5. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  6. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  7. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  8. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  9. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  10. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  11. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  12. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  13. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  14. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  15. 48 CFR 236.271 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...

  16. Natural Resource Information System. Volume I. Overall Description.

    ERIC Educational Resources Information Center

    Boeing Computer Services, Inc., Seattle, WA.

    Recognizing the need for the development of a computer based information system which would handle remote sensing as well as conventional mapping data, the Bureau of Indian Affairs and the Bureau of Land Management contracted with Boeing Computer Services for the design and construction of a prototype Natural Resource Information System. The…

  17. 76 FR 76438 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Davis-Bacon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... for OMB Review; Comment Request; Davis-Bacon Certified Payroll ACTION: Notice. SUMMARY: The Department... request (ICR) titled, ``Davis-Bacon Certified Payroll,'' to the Office of Management and Budget (OMB) for... payrolls to the Federal agency contracting for or financing the construction project, if the agency is a...

  18. 41 CFR 105-8.150-2 - Methods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Methods. 105-8.150-2... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY GENERAL SERVICES ADMINISTRATION § 105-8.150-2 Methods. (a... construction of new facilities, use of accessible rolling stock, or any other methods that result in making its...

  19. 41 CFR 105-8.150-2 - Methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Methods. 105-8.150-2... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY GENERAL SERVICES ADMINISTRATION § 105-8.150-2 Methods. (a... construction of new facilities, use of accessible rolling stock, or any other methods that result in making its...

  20. 41 CFR 105-8.150-2 - Methods.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Methods. 105-8.150-2... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY GENERAL SERVICES ADMINISTRATION § 105-8.150-2 Methods. (a... construction of new facilities, use of accessible rolling stock, or any other methods that result in making its...

  1. 41 CFR 105-8.150-2 - Methods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Methods. 105-8.150-2... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY GENERAL SERVICES ADMINISTRATION § 105-8.150-2 Methods. (a... construction of new facilities, use of accessible rolling stock, or any other methods that result in making its...

  2. 41 CFR 105-8.150-2 - Methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Methods. 105-8.150-2... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY GENERAL SERVICES ADMINISTRATION § 105-8.150-2 Methods. (a... construction of new facilities, use of accessible rolling stock, or any other methods that result in making its...

  3. Construction Management, in a Miami Test, Saves $1.5 Million

    ERIC Educational Resources Information Center

    Architectural Record, 1977

    1977-01-01

    In direct comparison with a high school built according to traditional design and contracting, a new prototype for the Dade County School District resulted in substantial savings without sacrificing quality. Available from: McGraw Hill Inc., 1221 Avenue of the Americas, New York, New York 10020, $5.00 single copy. (Author)

  4. 48 CFR 801.602-78 - Processing solicitations and contract documents for legal or technical review-Veterans Health...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Processing solicitations..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center, and the Denver Acquisition and Logistics Center. 801.602-78 Section 801.602-78 Federal Acquisition...

  5. 48 CFR 801.602-78 - Processing solicitations and contract documents for legal or technical review-Veterans Health...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center, and the Denver Acquisition and Logistics Center. 801.602-78 Section 801.602-78 Federal Acquisition... Acquisition Center, and the Denver Acquisition and Logistics Center. (a) If legal or technical review is...

  6. 48 CFR 801.602-78 - Processing solicitations and contract documents for legal or technical review-Veterans Health...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center, and the Denver Acquisition and Logistics Center. 801.602-78 Section 801.602-78 Federal Acquisition... Acquisition Center, and the Denver Acquisition and Logistics Center. (a) If legal or technical review is...

  7. 48 CFR 801.602-78 - Processing solicitations and contract documents for legal or technical review-Veterans Health...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Central Office (except Office of Construction and Facilities Management), the National Acquisition Center, and the Denver Acquisition and Logistics Center. 801.602-78 Section 801.602-78 Federal Acquisition... Acquisition Center, and the Denver Acquisition and Logistics Center. (a) If legal or technical review is...

  8. 41 CFR 60-3.14 - Technical standards for validity studies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... likely to affect validity differences; or that these factors are included in the design of the study and... construct validity is both an extensive and arduous effort involving a series of research studies, which... validity studies. 60-3.14 Section 60-3.14 Public Contracts and Property Management Other Provisions...

  9. 41 CFR 60-3.14 - Technical standards for validity studies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... likely to affect validity differences; or that these factors are included in the design of the study and... construct validity is both an extensive and arduous effort involving a series of research studies, which... validity studies. 60-3.14 Section 60-3.14 Public Contracts and Property Management Other Provisions...

  10. 41 CFR 60-3.14 - Technical standards for validity studies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... likely to affect validity differences; or that these factors are included in the design of the study and... construct validity is both an extensive and arduous effort involving a series of research studies, which... validity studies. 60-3.14 Section 60-3.14 Public Contracts and Property Management Other Provisions...

  11. 41 CFR 60-3.14 - Technical standards for validity studies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... likely to affect validity differences; or that these factors are included in the design of the study and... construct validity is both an extensive and arduous effort involving a series of research studies, which... validity studies. 60-3.14 Section 60-3.14 Public Contracts and Property Management Other Provisions...

  12. 41 CFR 60-3.14 - Technical standards for validity studies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... likely to affect validity differences; or that these factors are included in the design of the study and... construct validity is both an extensive and arduous effort involving a series of research studies, which... validity studies. 60-3.14 Section 60-3.14 Public Contracts and Property Management Other Provisions...

  13. The 'bankability' of the new waste technologies: an econometric method for risk sharing in private finance waste contracts.

    PubMed

    Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J

    2011-12-01

    The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.

  14. Acceptance of selective contracting: the role of trust in the health insurer

    PubMed Central

    2013-01-01

    Background In a demand oriented health care system based on managed competition, health insurers have incentives to become prudent buyers of care on behalf of their enrolees. They are allowed to selectively contract care providers. This is supposed to stimulate competition between care providers and both increase the quality of care and contain costs in the health care system. However, health insurers are reluctant to implement selective contracting; they believe their enrolees will not accept this. One reason, insurers believe, is that enrolees do not trust their health insurer. However, this has never been studied. This paper aims to study the role played by enrolees’ trust in the health insurer on their acceptance of selective contracting. Methods An online survey was conducted among 4,422 people insured through a large Dutch health insurance company. Trust in the health insurer, trust in the purchasing strategy of the health insurer and acceptance of selective contracting were measured using multiple item scales. A regression model was constructed to analyse the results. Results Trust in the health insurer turned out to be an important prerequisite for the acceptance of selective contracting among their enrolees. The association of trust in the purchasing strategy of the health insurer with acceptance of selective contracting is stronger for older people than younger people. Furthermore, it was found that men and healthier people accepted selective contracting by their health insurer more readily. This was also true for younger people with a low level of trust in their health insurer. Conclusion This study provides insight into factors that influence people’s acceptance of selective contracting by their health insurer. This may help health insurers to implement selective contracting in a way their enrolees will accept and, thus, help systems of managed competition to develop. PMID:24083663

  15. Acceptance of selective contracting: the role of trust in the health insurer.

    PubMed

    Bes, Romy E; Wendel, Sonja; Curfs, Emile C; Groenewegen, Peter P; de Jong, Judith D

    2013-10-02

    In a demand oriented health care system based on managed competition, health insurers have incentives to become prudent buyers of care on behalf of their enrolees. They are allowed to selectively contract care providers. This is supposed to stimulate competition between care providers and both increase the quality of care and contain costs in the health care system. However, health insurers are reluctant to implement selective contracting; they believe their enrolees will not accept this. One reason, insurers believe, is that enrolees do not trust their health insurer. However, this has never been studied. This paper aims to study the role played by enrolees' trust in the health insurer on their acceptance of selective contracting. An online survey was conducted among 4,422 people insured through a large Dutch health insurance company. Trust in the health insurer, trust in the purchasing strategy of the health insurer and acceptance of selective contracting were measured using multiple item scales. A regression model was constructed to analyse the results. Trust in the health insurer turned out to be an important prerequisite for the acceptance of selective contracting among their enrolees. The association of trust in the purchasing strategy of the health insurer with acceptance of selective contracting is stronger for older people than younger people. Furthermore, it was found that men and healthier people accepted selective contracting by their health insurer more readily. This was also true for younger people with a low level of trust in their health insurer. This study provides insight into factors that influence people's acceptance of selective contracting by their health insurer. This may help health insurers to implement selective contracting in a way their enrolees will accept and, thus, help systems of managed competition to develop.

  16. 48 CFR 11.503 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Liquidated Damages—Supplies, Services, or Research and Development, in fixed-price solicitations and contracts for supplies, services, or research and development when the contracting officer determines that...—Construction, in solicitations and contracts for construction, other than cost-plus-fixed-fee, when the...

  17. 7 CFR 1753.77 - Methods of minor construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction... Contract Form 773, “Miscellaneous Construction Work and Maintenance Services”, by RUS Contract Form 515, or by work order construction. The rules for using Form 515 for minor construction are contained in...

  18. 77 FR 6985 - General Services Administration Acquisition Regulation; Reinstatement of Coverage Pertaining to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Claims, for releases of claims under construction and building service contracts, was inadvertently... the release of claims under construction and building service contracts. At this time, consideration... for releases of claims under construction and building service contracts, was inadvertently deleted as...

  19. 48 CFR 52.227-4 - Patent Indemnity-Construction Contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Patent Indemnity... Clauses 52.227-4 Patent Indemnity—Construction Contracts. As prescribed in 27.201-2(d)(1), insert the following clause: Patent Indemnity—Construction Contracts (DEC 2007) Except as otherwise provided, the...

  20. 48 CFR 52.227-4 - Patent Indemnity-Construction Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Patent Indemnity... Clauses 52.227-4 Patent Indemnity—Construction Contracts. As prescribed in 27.201-2(d)(1), insert the following clause: Patent Indemnity—Construction Contracts (DEC 2007) Except as otherwise provided, the...

  1. 48 CFR 52.227-4 - Patent Indemnity-Construction Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Patent Indemnity... Clauses 52.227-4 Patent Indemnity—Construction Contracts. As prescribed in 27.201-2(d)(1), insert the following clause: Patent Indemnity—Construction Contracts (DEC 2007) Except as otherwise provided, the...

  2. 48 CFR 52.227-4 - Patent Indemnity-Construction Contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Patent Indemnity... Clauses 52.227-4 Patent Indemnity—Construction Contracts. As prescribed in 27.201-2(d)(1), insert the following clause: Patent Indemnity—Construction Contracts (DEC 2007) Except as otherwise provided, the...

  3. 48 CFR 52.227-4 - Patent Indemnity-Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Patent Indemnity... Clauses 52.227-4 Patent Indemnity—Construction Contracts. As prescribed in 27.201-2(d)(1), insert the following clause: Patent Indemnity—Construction Contracts (DEC 2007) Except as otherwise provided, the...

  4. A STUDY ON THE HIERARCHY OF MANAGEMENT ELEMENTS

    NASA Astrophysics Data System (ADS)

    Suzuki, Nobuyuki; Watanabe, Tadashi

    Compared to the late 20th century, the Japanese construction industry has drastically changed its business methodology, outlook and approach in response to global issues and the incredible advances in technology. Such influences, non-exhaustively include the; WTO Government procurement agreement, updating conditions of tendering and contracting, client demands for cost reduction and the rapid penetration of ICT (Information and Communication Technology) into modern society. These days, the significance of controlling Quality, Cost and Time (the so-called QCT) has been recognized as an eternal-triangle by almost all countries, Government organizations and the private sector. However, as the construction industry is exposed to , and influenced by, more and more internal and external dynamic factors, continued reliance on managing and controlling QCT elements on their own is no longer adequate in meeting the growing demands and expectations, and as such control of additional management elements is now essential to avoid problems, or minimize their potential impacts should they occur. This paper utilizes the results of a survey carried out amongst construction managers and consultants in Japan and overseas to develop a spatial network that defines the interaction of management factors as a weighted graphical model. The calculated closeness centrality index of the developed management network model is adopted to identify the initialelement hierarchy, which is then further analyzed using the minimum distance of independent relationships of management elements (Warshall-Floyd algorism methodology), to identify the optimum potential hierarchy for effective construction management. A key result of the analysis is the significance of "Human Resource" in the construction industry management element hierarchy alongside the traditional QCT elements.

  5. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  6. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  7. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  8. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  9. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  10. 17 CFR 250.83 - Exemption in the case of transactions with foreign associates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... become engaged in the performance of any service, sales, or construction contract for any associate... thereunder, relating to the performance of any service, sales, or construction contract for such associate... Service, Sales and Construction Contracts § 250.83 Exemption in the case of transactions with foreign...

  11. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  12. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  13. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  14. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  15. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  16. 48 CFR 928.103 - Performance and payment bonds for other than construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Financial Protections 928.103 Performance and payment bonds for other than construction contracts. ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance and payment bonds for other than construction contracts. 928.103 Section 928.103 Federal Acquisition Regulations...

  17. 48 CFR 28.103 - Performance and payment bonds for other than construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Other Financial Protections 28.103 Performance and payment bonds for other than construction contracts. ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance and payment bonds for other than construction contracts. 28.103 Section 28.103 Federal Acquisition Regulations...

  18. 48 CFR 36.207 - Pricing fixed-price construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing fixed-price... Contracting for Construction 36.207 Pricing fixed-price construction contracts. (a) Generally, firm-fixed... methods. (b) Lump-sum pricing shall be used in preference to unit pricing except when— (1) Large...

  19. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  20. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  1. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  2. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  3. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  4. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  5. 17 CFR 250.89 - Termination of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Service, Sales and Construction Contracts § 250.89 Termination of contracts. Every service, sales, or construction contract made after April... contain provision for its termination to the extent that performance may conflict with any rule...

  6. 17 CFR 250.89 - Termination of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Service, Sales and Construction Contracts § 250.89 Termination of contracts. Every service, sales, or construction contract made after April... contain provision for its termination to the extent that performance may conflict with any rule...

  7. 48 CFR 536.570-5 - Working hours.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Working hours. 536.570-5... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-5 Working hours. Insert 552.236-74, Working Hours, in solicitations and contracts if construction, dismantling...

  8. 48 CFR 536.570-11 - Heat.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  9. 48 CFR 536.570-11 - Heat.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  10. 48 CFR 36.520 - Contracting by negotiation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contracting by negotiation... by negotiation. The contracting officer shall insert in solicitations for construction the provision at 52.236-28, Preparation of Offers—Construction, when contracting by negotiation. [62 FR 51258, Sept...

  11. 48 CFR 36.520 - Contracting by negotiation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracting by negotiation... by negotiation. The contracting officer shall insert in solicitations for construction the provision at 52.236-28, Preparation of Offers—Construction, when contracting by negotiation. [62 FR 51258, Sept...

  12. 48 CFR 36.520 - Contracting by negotiation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contracting by negotiation... by negotiation. The contracting officer shall insert in solicitations for construction the provision at 52.236-28, Preparation of Offers—Construction, when contracting by negotiation. [62 FR 51258, Sept...

  13. 48 CFR 36.520 - Contracting by negotiation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracting by negotiation... by negotiation. The contracting officer shall insert in solicitations for construction the provision at 52.236-28, Preparation of Offers—Construction, when contracting by negotiation. [62 FR 51258, Sept...

  14. 48 CFR 36.520 - Contracting by negotiation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contracting by negotiation... by negotiation. The contracting officer shall insert in solicitations for construction the provision at 52.236-28, Preparation of Offers—Construction, when contracting by negotiation. [62 FR 51258, Sept...

  15. 48 CFR 536.570-11 - Heat.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  16. 48 CFR 536.570-11 - Heat.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  17. 48 CFR 536.570-11 - Heat.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  18. 48 CFR 536.570-3 - Specialist.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Specialist. 536.570-3... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-3 Specialist. Insert 552.236-72, Specialist, in solicitations and contracts for construction if the technical sections...

  19. 48 CFR 436.579 - Opted timber sale road requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Sale Road Requirements, in road construction contracts resulting from a timber sale turnback. ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Opted timber sale road... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 436.579 Opted timber...

  20. 48 CFR 17.604 - Identifying management and operating contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Identifying management and... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.604 Identifying management and operating contracts. A management and operating contract is...

  1. 48 CFR 17.604 - Identifying management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Identifying management and... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.604 Identifying management and operating contracts. A management and operating contract is...

  2. Psychological contracts: a new strategy for retaining reduced-hour physicians.

    PubMed

    Hartwell, Jennifer K

    2010-01-01

    As a retention strategy, healthcare organizations offer reduced-hour schedules to physicians seeking better work-family balance. However, this quantitative study of 94 full-time and reduced-hour female physicians in the Boston area found that working fewer hours helps physicians achieve better balance but does not improve their burnout or career satisfaction, or impact their intention to quit or leave the field of medicine. Instead, the findings demonstrate that psychological contract fulfillment, which reflects the subjective nature of the employment relationship, is more important than work hours, an objective job condition, in predicting intention to quit and these other outcomes. A fine-grained analysis is initiated uncovering the multidimensionality of the psychological contract construct. To integrate successful reduced-hour arrangements for physicians, medical managers are directed to the importance of understanding the composition of reduced-hour physicians' psychological contracts, specifically, their need to do challenging work, receive high levels of supervisor support, and promotion opportunities.

  3. Elementary Principals: A Checklist to Succeed. ACSA Operations Notebook 23.

    ERIC Educational Resources Information Center

    Amato, Ted, Ed.

    This operations notebook is constructed so that it can serve as a practical guide and quick reference for elementary school principals. It has a checklist-type format, and the entire document can be inserted into a three-ring binder. The eight topics covered include preparation for the opening of school, contract management, handling emergencies,…

  4. 48 CFR 1436.270-5 - Part IV-Representations and instructions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for award. Identify all factors that will be considered in awarding the contract (See, for example... THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.270-5 Part IV—Representations and instructions. The CO shall...

  5. 48 CFR 1436.270-5 - Part IV-Representations and instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for award. Identify all factors that will be considered in awarding the contract (See, for example... THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.270-5 Part IV—Representations and instructions. The CO shall...

  6. 48 CFR 1827.304-3 - Contracts for construction work or architect-engineer services. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... work or architect-engineer services. (NASA supplements paragraph (a)) 1827.304-3 Section 1827.304-3... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1827.304-3 Contracts for construction work or architect-engineer services. (NASA supplements paragraph (a)) (a) For construction or...

  7. 48 CFR 53.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Construction and architect-engineer contracts. 53.236 Section 53.236 Federal Acquisition Regulations System FEDERAL ACQUISITION...-engineer contracts. ...

  8. 48 CFR 53.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Construction and architect-engineer contracts. 53.236 Section 53.236 Federal Acquisition Regulations System FEDERAL ACQUISITION...-engineer contracts. ...

  9. 48 CFR 53.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Construction and architect-engineer contracts. 53.236 Section 53.236 Federal Acquisition Regulations System FEDERAL ACQUISITION...-engineer contracts. ...

  10. 48 CFR 53.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Construction and architect-engineer contracts. 53.236 Section 53.236 Federal Acquisition Regulations System FEDERAL ACQUISITION...-engineer contracts. ...

  11. 48 CFR 53.236 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Construction and architect-engineer contracts. 53.236 Section 53.236 Federal Acquisition Regulations System FEDERAL ACQUISITION...-engineer contracts. ...

  12. Texas State Library Grant Management Handbook: A Procedures Manual to Uniform Grants and Contract Management Standards Based on Texas Civil Statutes, Article 4413 (32g) and the Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.

    ERIC Educational Resources Information Center

    Conable, Sharon R.

    The purpose of this manual is to provide a conceptual framework of information concerning the reporting, financial, contractual, and auditing requirements for recipients of Texas State Library grants funded with state and federal funds under the Library Systems Act (LSA) and the Library Service and Construction Act (LSCA). The manual is divided…

  13. Grant Management Handbook: A Procedures Manual to Uniform Grants and Contract Management Standards Based on Texas Civil Statutes, Article 4413 (32g) and the Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.

    ERIC Educational Resources Information Center

    Conable, Sharon R.

    This manual provides a conceptual framework and reference source concerning the reporting, financial contractual, and auditing requirements for recipients of Texas State Library grants funded with state and federal funds under the Library Systems Act (LSA) and the Library Services and Construction Act (LSCA). The handbook is divided into 12…

  14. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  15. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, asmore » set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)« less

  16. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  17. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  18. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  19. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  20. Categorization of potential project cost overrun factors in construction industry

    NASA Astrophysics Data System (ADS)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  1. 7 CFR 1710.120 - Construction standards and contracting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.120 Construction standards and contracting. Borrowers shall follow all RUS requirements regarding construction work plans, construction standards...

  2. 48 CFR 1522.804-2 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  3. 48 CFR 1522.804-2 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  4. 48 CFR 1522.804-2 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  5. 48 CFR 1522.804-2 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  6. 48 CFR 1522.804-2 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  7. The S-curve for forecasting waste generation in construction projects.

    PubMed

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Hospital contract management: a descriptive profile.

    PubMed Central

    Alexander, J A; Lewis, B L

    1984-01-01

    Despite the dramatic growth in hospital contract management in the last decade, research only recently has begun to provide insights into the structure, operation, and effectiveness of these arrangements. Two descriptive questions regarding hospital contract management are addressed in an effort to increase correspondence between theoretical and evaluative research in this area: (1) how do contract-managed hospitals differ from traditionally managed hospitals? and (2) how do contract-managed hospitals differ from each other? Principal discriminating variables in the analyses are hospital size, control, urban-rural location, region, management organization control, and management organization size. Results of the analysis on a sample of 406 contract-managed hospitals and 401 unaffiliated hospitals reveal important differences between contract-managed and traditionally managed hospitals as well as among contract management organizations. These findings are discussed in terms of their implications for future research and performance evaluations on contract management arrangements. PMID:6490376

  9. Navy and Coast Guard Shipbuilding: Navy Should Reconsider Approach to Warranties for Correcting Construction Defects

    DTIC Science & Technology

    2016-03-01

    million in guaranty claims under the construction contract. • LCS 3 and 4—According to Navy contracting officers, the Navy negotiated lower...their responsibility for both guaranty claims and follow-on work to correct the defects. Shipbuilders earn profit under the construction contract, and...for its ships with guarantees. On average, commercial ship buyers told us that the number of warranty claims totals 1 to 2 percent of the construction

  10. 48 CFR 422.804-2 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  11. 48 CFR 422.804-2 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  12. 48 CFR 422.804-2 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  13. 48 CFR 422.804-2 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  14. 48 CFR 422.804-2 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  15. Risk Management in Construction Project: Taking Fairness into Account

    NASA Astrophysics Data System (ADS)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.

  16. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  17. Synergistic Approach Integrating Joint Capabilities for USSOCOM Contingency Contracting: Construction Management Module

    DTIC Science & Technology

    2010-12-01

    59 a. The Joint Uniform Lessons Learned System (JULLS) .........59 b. Acquisition Community Connection (ACC) ..........................59 c...Report ACC Acquisition Community Connection ADDIE Analyze, Design, Develop, Implement, Evaluate AFFARS Air Force Federal Acquisition Regulation...Operations J4 Logistics J5 Plans J6 Communications J8 Programming and Comptroller J&A Justification and Approval JARB Joint Acquisition

  18. China Report: Economic Affairs. No. 372

    DTIC Science & Technology

    1983-08-12

    REPUBLIC OF CHINA NATIONAL POLICY AND ISSUES PRC Tax System, Economic Restructuring (Gong Zhi; JINGJI GUANLI, No 6, 5 Jun 83) 1 ECONOMIC...9 AGGREGATE ECONOMIC DATA National, Provincial-Level Aggregates 11 ECONOMIC MANAGEMENT JINGJI GUANLI on Contracted Responsibilities... JINGJI GUANLI, No 6, 5 Jun 83) 14 Jiangsu’s Exchanges With Other Provinces Noted (XINHUA, 12 Jul 83) 18 FINANCE AND BANKING Construction

  19. Atlas/Data Abstract for the United States and Selected Areas. Fiscal Year 1989

    DTIC Science & Technology

    1989-01-01

    are generally reported at the i t where the work is performed. For example. if a con :ac or located in Nevada and wins a construction )ot! in Utah, tl...0 4l?~.5 1’".t� Service Contracts 24. j𔃾. . 1 , :of,;t) j , 467, 4X Construction Contrac.ts 3, f5’ Ś). 12,tf.;9" Z3),t); 6,:16 Civil Function...Contracts 237,277 58,434 22,106 148,375 8,362 Construction Contracts 162,202 113,971 48,231 0 0 Civil Function Contracts 17,458 17,458 0 0 0

  20. 48 CFR 36.521 - Specifications and drawings for construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... drawings for construction. 36.521 Section 36.521 Federal Acquisition Regulations System FEDERAL ACQUISITION... 36.521 Specifications and drawings for construction. The contracting officer shall insert the clause at 52.236-21, Specifications and Drawings for Construction, in solicitations and contracts when a...

Top