Sample records for contract cost principles

  1. 48 CFR 731.770 - OMB Circular A-122, cost principles for nonprofit organizations; USAID implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 731.770 OMB Circular A-122, cost principles... and Assistance, has been so designated. The Overhead and Special Cost and Contract Close-Out Branch...

  2. 48 CFR 731.770 - OMB Circular A-122, cost principles for nonprofit organizations; USAID implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 731.770 OMB Circular A-122, cost principles... and Assistance, has been so designated. The Overhead and Special Cost and Contract Close-Out Branch...

  3. 48 CFR 49.113 - Cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost principles. 49.113 Section 49.113 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.113 Cost principles. The cost principles and procedures in the...

  4. 48 CFR 1631.200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... actual costs incurred. ... HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.200 Scope of subpart. The cost principles under this...

  5. 48 CFR 731.370 - Predetermined fixed rates for indirect costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts... determining the indirect costs applicable under contracts with educational institutions. ...

  6. 48 CFR 731.370 - Predetermined fixed rates for indirect costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts... determining the indirect costs applicable under contracts with educational institutions. ...

  7. 23 CFR 140.907 - Overhead and indirect construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  8. 2 CFR Appendix A to Part 220 - Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With Educational Institutions A Appendix A to Part 220 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved COST PRINCIPLES FOR EDUCATIONAL INSTITUTIONS (OMB CIRCULAR A-21)...

  9. 48 CFR 31.205-15 - Fines, penalties, and mischarging costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... violations of, or failure of the contractor to comply with, Federal, State, local, or foreign laws and... of the contract or written instructions from the contracting officer. (b) Costs incurred in...

  10. 45 CFR 602.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply.... (b) Applicable cost principles. For each kind of organization, there is a set of Federal principles... principles applicable to the organization incurring the costs. The following chart lists the kinds of...

  11. 48 CFR 352.216-70 - Additional cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Additional cost principles... Additional cost principles. As prescribed in 316.307(j), the Contracting Officer shall insert the following clause: Additional Cost Principles (January 2006) (a) Bid and proposal (B & P) costs. (1) B & P costs are...

  12. 48 CFR 31.205-21 - Labor relations costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-21 Labor relations costs. Costs incurred in maintaining satisfactory relations between the... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Labor relations costs. 31...

  13. 48 CFR 31.701 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.701 Purpose. This subpart provides the principles for determining the cost applicable to work performed by nonprofit... purposes, of which no part of the net earnings inure to the benefit of any private shareholder or...

  14. Federal employees health benefits program; revision of contract cost principles and procedures, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation amending the Federal Employees Health Benefits (FEHB) Acquisition Regulation (FEHBAR). This regulation provides additional contract cost principles and procedures for FEHB Program experience-rated contracts and is intended to clarify our requirements and enhance our oversight of FEHB carriers.

  15. 21 CFR 1403.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with cost... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 1403...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  16. 10 CFR 600.222 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES Uniform Administrative...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  17. 48 CFR 31.205-17 - Idle facilities and idle capacity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial..., or sale, in accordance with sound business, economics, or security practices. Widespread idle...

  18. 28 CFR 66.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  19. 48 CFR 931.205-47 - Costs related to legal and other proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... those contractors and subcontractors with contracts exceeding $5,000,000. Employee whistleblower action... against a covered contractor or subcontractor, the contracting officer— (i) May authorize reimbursement of...

  20. 48 CFR 970.3102-05-6 - Compensation for personal services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Cost Principles and... of the contract. This personnel appendix shall be negotiated using the principles and policies of 48... related expenses allowable under the contract and documents personnel policies, practices and plans which...

  1. 48 CFR 2131.205-71 - Reinsurer administrative expense costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 2131.205-71... as set forth in the contract is an allowable cost when documented through an internal accounting... expense costs. 2131.205-71 Section 2131.205-71 Federal Acquisition Regulations System OFFICE OF PERSONNEL...

  2. 48 CFR 731.205-46 - Travel costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 731.205-46 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 731.205-46 Travel costs. It is USAID policy to require prior written approval of international travel by...

  3. 20 CFR 437.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CFR Part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 437...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  4. 14 CFR 1273.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR part 31, Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial.... (b) Applicable cost principles. For each kind of organization, there is a set of Federal principles...

  5. 15 CFR 24.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  6. 45 CFR 1174.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 1174...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  7. 45 CFR 1183.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 1183...) Applicable cost principles. For each kind of organization, there is a set of Federal principles for...

  8. 43 CFR 12.927 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 CFR part 31, Contract Principles and Procedures or uniform cost accounting standards that comply... COST PRINCIPLES FOR ASSISTANCE PROGRAMS Uniform Administrative Requirements for Grants and Agreements... Circular A-87, Cost Principles for State and Local Governments. Non-profit organization OMB Circular A-122...

  9. 48 CFR 49.303-4 - Adjustment of indirect costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Adjustment of indirect costs. 49.303-4 Section 49.303-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts...

  10. 48 CFR 731.773 - Independent research and development costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Independent research and development costs. 731.773 Section 731.773 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit...

  11. 48 CFR 731.773 - Independent research and development costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Independent research and development costs. 731.773 Section 731.773 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit...

  12. 48 CFR 1516.303-72 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... economic benefits for the contractor and the Government beyond the Government's contract. (b) Cost-sharing... reasonable, allocable and allowable in accordance with the cost principles of the contract. Allowable costs...

  13. 48 CFR 31.303 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Requirements. 31.303... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 31.303 Requirements. (a) Contracts that refer to this subpart 31.3 for determining allowable costs under contracts...

  14. 48 CFR 31.303 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Requirements. 31.303... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 31.303 Requirements. (a) Contracts that refer to this subpart 31.3 for determining allowable costs under contracts...

  15. 48 CFR 31.303 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requirements. 31.303... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 31.303 Requirements. (a) Contracts that refer to this subpart 31.3 for determining allowable costs under contracts...

  16. 48 CFR 31.303 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 31.303... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 31.303 Requirements. (a) Contracts that refer to this subpart 31.3 for determining allowable costs under contracts...

  17. 48 CFR 49.109-7 - Settlement by determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.109-7 Settlement by determination. (a... determination of the amount due consistent with the termination clause, including any cost principles...

  18. 32 CFR 32.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractor receiving a. cost-type contract under an assistance award, there is a set of Federal principles... principles applicable to the entity incurring the costs. (b) Governmental organizations. Allowability of... of OMB Circular A-87, 8 “Cost Principles for State and Local Governments.” 8 See footnote 1 to § 32.1...

  19. 48 CFR 731.205-71 - Salary supplements for Host Government employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 731.205-71 Salary supplements for Host Government employees. (a... Contracting Officer shall provide written approval to the contractor in order for such costs to be eligible...

  20. 48 CFR 731.109 - Advance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....109 Section 731.109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 731.109 Advance... Special Cost and Contract Close-Out Branch, Office of Acquisition and Assistance. Such advance...

  1. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  2. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  3. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  4. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  5. 48 CFR 31.202 - Direct costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.202 Direct... amount as an indirect cost if the accounting treatment— (1) Is consistently applied to all final cost... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Direct costs. 31.202...

  6. 45 CFR Appendix E to Part 74 - Principles for Determining Costs Applicable to Research and Development Under Grants and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Research and Development Under Grants and Contracts With Hospitals E Appendix E to Part 74 Public Welfare... Research and Development Under Grants and Contracts With Hospitals i. purpose and scope A. Objectives. This appendix provides principles for determining the costs applicable to research and development work...

  7. 45 CFR Appendix E to Part 74 - Principles for Determining Costs Applicable to Research and Development Under Grants and...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Research and Development Under Grants and Contracts With Hospitals E Appendix E to Part 74 Public Welfare... Research and Development Under Grants and Contracts With Hospitals i. purpose and scope A. Objectives. This appendix provides principles for determining the costs applicable to research and development work...

  8. 45 CFR Appendix E to Part 74 - Principles for Determining Costs Applicable to Research and Development Under Grants and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Research and Development Under Grants and Contracts With Hospitals E Appendix E to Part 74 Public Welfare... Research and Development Under Grants and Contracts With Hospitals i. purpose and scope A. Objectives. This appendix provides principles for determining the costs applicable to research and development work...

  9. 45 CFR Appendix E to Part 74 - Principles for Determining Costs Applicable to Research and Development Under Grants and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Research and Development Under Grants and Contracts With Hospitals E Appendix E to Part 74 Public Welfare... Research and Development Under Grants and Contracts With Hospitals i. purpose and scope A. Objectives. This appendix provides principles for determining the costs applicable to research and development work...

  10. 45 CFR Appendix E to Part 74 - Principles for Determining Costs Applicable to Research and Development Under Grants and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Research and Development Under Grants and Contracts With Hospitals E Appendix E to Part 74 Public Welfare... Research and Development Under Grants and Contracts With Hospitals i. purpose and scope A. Objectives. This appendix provides principles for determining the costs applicable to research and development work...

  11. 48 CFR 1631.205-10 - Cost of money.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES... is identified in the prior year's Annual Accounting Statement or, for new experience-rated carriers...

  12. 48 CFR 1631.205-10 - Cost of money.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...

  13. 48 CFR 1631.205-10 - Cost of money.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...

  14. 48 CFR 31.205-40 - Special tooling and special test equipment costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Special tooling and special test equipment costs. 31.205-40 Section 31.205-40 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-40...

  15. 26 CFR 1.460-5 - Cost allocation rules.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... must be allocated to a long-term contract when dedicated to the contract under principles similar to... component is dedicated, under principles similar to those in § 1.263A-11(b)(2). A taxpayer maintaining... exempt construction contract reported using the CCM— (A) Marketing and selling expenses, including...

  16. 48 CFR 231.205-22 - Legislative lobbying costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES... preparing any material, report, list, or analysis on the actual or projected economic or employment impact...

  17. 48 CFR 231.703 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Requirements. 231.703... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 231.703 Requirements. Under 10 U.S.C. 2249, the costs cited in 231.205-22(a) are...

  18. 48 CFR 231.703 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Requirements. 231.703... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 231.703 Requirements. Under 10 U.S.C. 2249, the costs cited in 231.205-22(a) are...

  19. 48 CFR 231.703 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Requirements. 231.703... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 231.703 Requirements. Under 10 U.S.C. 2249, the costs cited in 231.205-22(a) are...

  20. 48 CFR 231.703 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Requirements. 231.703... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 231.703 Requirements. Under 10 U.S.C. 2249, the costs cited in 231.205-22(a) are...

  1. 29 CFR 1470.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting... Financial Administration § 1470.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used... grantee or subgrantee. (b) Applicable cost principles. For each kind of organization, there is a set of...

  2. 45 CFR 92.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to that circular 48 CFR Part 31. Contract Cost Principles and Procedures, or uniform cost accounting... Financial Administration § 92.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used... grantee or subgrantee. (b) Applicable cost principles. For each kind of organization, there is a set of...

  3. 13 CFR 143.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting... Financial Administration § 143.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used... grantee or subgrantee. (b) Applicable cost principles. For each kind of organization, there is a set of...

  4. 34 CFR 80.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 80.22... kind of organization, there is a set of Federal principles for determining allowable costs. For the...

  5. 2 CFR Appendix A to Part 220 - Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With Educational Institutions A Appendix A to Part 220 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserve...

  6. 2 CFR Appendix A to Part 220 - Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With Educational Institutions A Appendix A to Part 220 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserve...

  7. 2 CFR Appendix A to Part 220 - Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false Principles for Determining Costs Applicable to Grants, Contracts, and Other Agreements With Educational Institutions A Appendix A to Part 220 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserve...

  8. 48 CFR 1631.205-75 - Selling costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES... advertising costs’, and The Federal Employees Health Benefits Handbook for Personnel and Payroll Offices... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Selling costs. 1631.205-75...

  9. 48 CFR 31.205-8 - Contributions or donations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-8 Contributions or donations. Contributions or donations, including cash, property and...

  10. 48 CFR 1631.203 - Indirect costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 1631.203 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... general practice in the insurance industry. [70 FR 31391, June 1, 2005] ...

  11. 48 CFR 231.205-19 - Insurance and indemnification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... indemnification. 231.205-19 Section 231.205-19 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... to the cost limitations in FAR 31.205-19(e), self-insurance and purchased insurance costs are subject...

  12. 48 CFR 231.205-19 - Insurance and indemnification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... indemnification. 231.205-19 Section 231.205-19 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... to the cost limitations in FAR 31.205-19(e), self-insurance and purchased insurance costs are subject...

  13. 48 CFR 231.205-19 - Insurance and indemnification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indemnification. 231.205-19 Section 231.205-19 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... to the cost limitations in FAR 31.205-19(e), self-insurance and purchased insurance costs are subject...

  14. 48 CFR 231.205-19 - Insurance and indemnification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... indemnification. 231.205-19 Section 231.205-19 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... to the cost limitations in FAR 31.205-19(e), self-insurance and purchased insurance costs are subject...

  15. 48 CFR 231.205-19 - Insurance and indemnification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... indemnification. 231.205-19 Section 231.205-19 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND... to the cost limitations in FAR 31.205-19(e), self-insurance and purchased insurance costs are subject...

  16. Circular A-21: Cost Principles for Educational Institutions. NACUBO Special Report 79-4.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    The Office of Management and Budget Circular A-21 on cost principles for educational institutions, which was published in the Federal Register on March 6, 1979, is reproduced in its entirety, and a brief introduction by Max A. Binkley is presented. The circular established principles for determining costs applicable to federal grants, contracts,…

  17. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 49.305-2 Section 49.305-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for...

  18. 48 CFR 2131.205-1 - Public relations and advertising costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Public relations and... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 2131.205-1 Public relations and advertising costs. The provisions of FAR 31.205-1 shall be modified to include the following...

  19. 48 CFR 49.109-4 - No-cost settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false No-cost settlement. 49.109-4 Section 49.109-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.109-4 No-cost settlement. The TCO shall execute a...

  20. 48 CFR 31.201-5 - Credits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.201-5 Credits... cost and received by or accruing to the contractor shall be credited to the Government either as a cost reduction or by cash refund. See 31.205-6(j)(3) for rules governing refund or credit to the Government...

  1. 48 CFR 1631.205-79 - Mandatory statutory reserves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-79 Mandatory statutory reserves. Charges for mandatory statutory reserves are not allowed unless provided for in the contract...

  2. 48 CFR 731.772 - Compensation for personal services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services. 731.772 Section 731.772 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit... applicable to contracts with a nonprofit organization. [57 FR 5236, Feb. 13, 1992] ...

  3. 48 CFR 731.772 - Compensation for personal services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... services. 731.772 Section 731.772 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit... applicable to contracts with a nonprofit organization. [57 FR 5236, Feb. 13, 1992] ...

  4. 48 CFR 1631.205-75 - Selling costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... enrollees information about their choices among health plans (but see FAR 31.205-1 ‘Public relations and... Section 1631.205-75 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES...

  5. 48 CFR 931.102 - Fixed-price contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fixed-price contracts. 931... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 931.102 Fixed-price contracts. The intent of... Government in— (a) Pricing fixed-price prime contracts and modifications, (b) Evaluating the reasonableness...

  6. 48 CFR 1631.205-82 - Audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-82 Audits. Carriers should ensure that the public accounting firms with which they contract for audits of FEHB accounts are registered with the Public Company...

  7. 48 CFR 731.371 - Compensation for personal services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... services. 731.371 Section 731.371 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With... AIDAR 731.205-6(b) are also applicable to contracts with a nonprofit organization. (2) In considering...

  8. 48 CFR 731.373 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.373 Section 731.373 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With... recruitment incentives are set forth in AIDAR 731.205-70. These policies are also applicable to contracts with...

  9. Non-Binding Arbitration

    DTIC Science & Technology

    1990-09-01

    costs. However, the panel did not accept of an expert in public contract law , and the documentation of costs submitted by two experts on cement...construction expert, and both panel recommended a payment of parties agreed to the contract law expert, $57,000. who was to serve as the neutral party. The...particular needs and of the contract language, or by applying situation. relevant principles from contract law . The arbitrator felt the contractor had

  10. 48 CFR 731.774 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.774 Section 731.774 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit... are set forth in AIDAR 731.205-70. These policies are also applicable to contracts with a nonprofit...

  11. 48 CFR 2131.103 - Contracts with commercial organizations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts with commercial organizations. 2131.103 Section 2131.103 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 2131.103 Contracts with commercial organizations. The...

  12. 2 CFR Appendix A to Part 225 - General Principles for Determining Allowable Costs

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... in the financing of a particular program or project. The principles are designed to provide that..., contract, grant, or other activity for which cost data are needed and for which costs are incurred. 12... Indian tribe, band, nation, or other organized group or community (including any native village as...

  13. 2 CFR Appendix A to Part 225 - General Principles for Determining Allowable Costs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in the financing of a particular program or project. The principles are designed to provide that..., contract, grant, or other activity for which cost data are needed and for which costs are incurred. 12... Indian tribe, band, nation, or other organized group or community (including any native village as...

  14. 48 CFR 731.205-6 - Compensation for personal services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... services. 731.205-6 Section 731.205-6 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... USAID Direct Contracting (available at http://www.usaid.gov/policy/ads/300/302.pdf), it will be...

  15. 48 CFR 731.205-70 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.205-70 Section 731.205-70 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... overseas under a contract does not qualify for the exemption for overseas income provided under section 911...

  16. 48 CFR 31.205-41 - Taxes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Taxes. 31.205-41 Section... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-41 Taxes. (a) The following types of costs are allowable: (1) Federal, State, and local taxes (see part 29...

  17. 48 CFR 31.703 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Requirements. 31.703 Section 31.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.703 Requirements...

  18. 48 CFR 31.703 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 31.703 Section 31.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.703 Requirements...

  19. 48 CFR 231.303 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Requirements. 231.303... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 231.303 Requirements. (1) Pursuant to section 841 of the National Defense...

  20. 48 CFR 31.703 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requirements. 31.703 Section 31.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.703 Requirements...

  1. 48 CFR 31.703 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Requirements. 31.703 Section 31.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.703 Requirements...

  2. 48 CFR 231.303 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Requirements. 231.303... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 231.303 Requirements. (1) Pursuant to section 841 of the National Defense...

  3. 48 CFR 231.303 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Requirements. 231.303... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 231.303 Requirements. (1) Pursuant to section 841 of the National Defense...

  4. 48 CFR 49.301 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 49.301 Section 49.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  5. 48 CFR 2131.205-41 - Taxes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 2131.205-41 Taxes. (a) FAR 31.205-41, as modified in paragraphs (b) through (e), is applicable to contracts in the FEGLI Program. (b) As long as 5 U...

  6. 48 CFR 42.705-4 - State and local governments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false State and local... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.705-4 State and local governments. OMB Circular No. A-87 concerning cost principles for state and local governments (see subpart 31...

  7. 48 CFR 231.603 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Requirements. 231.603... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With State, Local, and Federally Recognized Indian Tribal Governments 231.603 Requirements. Under 10 U.S.C...

  8. 48 CFR 231.603 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Requirements. 231.603... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With State, Local, and Federally Recognized Indian Tribal Governments 231.603 Requirements. Under 10 U.S.C...

  9. 48 CFR 231.603 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Requirements. 231.603... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With State, Local, and Federally Recognized Indian Tribal Governments 231.603 Requirements. Under 10 U.S.C...

  10. 48 CFR 231.603 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Requirements. 231.603... OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With State, Local, and Federally Recognized Indian Tribal Governments 231.603 Requirements. Under 10 U.S.C...

  11. 48 CFR 49.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 49.304-1 Section 49.304-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  12. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 49.305-1 Section 49.305-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  13. 48 CFR 49.304 - Procedure for partial termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procedure for partial termination. 49.304 Section 49.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts...

  14. 48 CFR 49.302 - Discontinuance of vouchers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Discontinuance of vouchers. 49.302 Section 49.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for...

  15. 48 CFR 49.303-3 - Audit of settlement proposal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of settlement proposal. 49.303-3 Section 49.303-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts...

  16. 48 CFR 49.305 - Adjustment of fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Adjustment of fee. 49.305 Section 49.305 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  17. 48 CFR 49.304-3 - Submission of vouchers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of vouchers. 49.304-3 Section 49.304-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for...

  18. 48 CFR 49.303-5 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final settlement. 49.303-5 Section 49.303-5 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  19. 48 CFR 49.303-1 - Submission of settlement proposal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of settlement proposal. 49.303-1 Section 49.303-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts...

  20. 48 CFR 331.102-70 - Pricing of adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Pricing of adjustments... CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 331.102-70 Pricing of adjustments. The Contracting Officer shall insert the clause in 352.231-71, Pricing of Adjustments, in...

  1. 25 CFR 700.477 - Administration of financial assistance and recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements; and (2) Federal Management Circular 74-4 5 CFR part 1310, entitled “Cost Principles Applicable to... Management and Budget Circular A-122, entitled “Cost Principles for Nonprofit Organizations.” (c) A profit... such contracts or grants shall be given to Indian organization and to Indian owned economic enterprises...

  2. 48 CFR 749.111-71 - Required review and approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approval. 749.111-71 Section 749.111-71 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111-71 Required review and... fee of a cost-reimbursement contract or subcontract and: (i) In the case of complete termination, the...

  3. 48 CFR 352.216-70 - Additional cost principles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Federal contracts, grants, and agreements, including the development of scientific, cost, and other data... method, they may be accepted if they are found to be reasonable and equitable. (4) B & P costs do not...

  4. 48 CFR 1631.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Definitions. 1631.1 Section 1631.1 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND...

  5. An Analysis of Contracting Officer Technical Representative Training Requirements.

    DTIC Science & Technology

    1982-06-01

    AI and contract law . On the basis of the perceived need to eliminate superflu- ous material from the training of CA contract representatives and...Cost and pricing principles 3. Basic contract law 4. Types of contracts S. Definition of important terms 6. Understanding the terms and conditions--how...digesting and/or deletions to coincide with the learning objectives developed in Chapter III include: 1. Federal Acquisition Policy 2. Contract Law 3

  6. 48 CFR 1631.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definitions. 1631.1 Section 1631.1 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES...

  7. 48 CFR 49.303 - Procedure after discontinuing vouchers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procedure after discontinuing vouchers. 49.303 Section 49.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement...

  8. 48 CFR 12.403 - Termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... guidance to the extent that part 49 does not conflict with this section and the language of the termination... required to comply with the cost accounting standards or the contract cost principles in part 31. The...

  9. 48 CFR 2831.101 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Objectives. 2831.101 Section 2831.101 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General Contracting Requirements CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 2831.101 Objectives. (a) The PE is the...

  10. 48 CFR 31.201-2 - Determining allowability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Board, if applicable, otherwise, generally accepted accounting principles and practices appropriate to...) Certain cost principles in this subpart incorporate the measurement, assignment, and allocability rules of... the contract and the requirements of the standards themselves. (c) When contractor accounting...

  11. 48 CFR 2831.109 - Advance agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Advance agreements. 2831... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 2831.109 Advance agreements. (a) The DOJ and bureau contracting officers are encouraged to negotiate advance agreements concerning the treatment of...

  12. 78 FR 38539 - Federal Acquisition Regulation; Applicability of the Senior Executive Compensation Benchmark

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... 808 breached contracts awarded before the statutory date of enactment (General Dynamics Corp. v. U.S... 51 U.S.C. 20115. PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES 0 2. Amend section 31.205-6 by-- 0... 38539

  13. 48 CFR 31.002 - Availability of accounting guide.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Availability of accounting... GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES 31.002 Availability of accounting guide. Contractors needing assistance in developing or improving their accounting systems and procedures...

  14. 48 CFR 970.3102-05-18 - Independent research and development and bid and proposal costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... development and bid and proposal costs. 970.3102-05-18 Section 970.3102-05-18 Federal Acquisition Regulations... Contract Cost Principles and Procedures 970.3102-05-18 Independent research and development and bid and proposal costs. (c) Independent Research and Development and Bid and Proposal costs are unallowable...

  15. 48 CFR 31.205-3 - Bad debts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Bad debts. 31.205-3... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-3 Bad debts. Bad debts, including actual or estimated losses arising from uncollectible accounts receivable due...

  16. 48 CFR 49.303-2 - Submission of inventory disposal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of inventory disposal schedules. 49.303-2 Section 49.303-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement...

  17. 48 CFR 970.3102-05-30-70 - Patent costs and technology transfer costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technology transfer costs. 970.3102-05-30-70 Section 970.3102-05-30-70 Federal Acquisition Regulations System... Principles and Procedures 970.3102-05-30-70 Patent costs and technology transfer costs. (a) For management and operating contracts that do not include the clause at 970.5227-3, Technology Transfer Mission, the...

  18. 48 CFR 970.3102-05-30-70 - Patent costs and technology transfer costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technology transfer costs. 970.3102-05-30-70 Section 970.3102-05-30-70 Federal Acquisition Regulations System... Principles and Procedures 970.3102-05-30-70 Patent costs and technology transfer costs. (a) For management and operating contracts that do not include the clause at 970.5227-3, Technology Transfer Mission, the...

  19. 48 CFR 970.3102-05-30-70 - Patent costs and technology transfer costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology transfer costs. 970.3102-05-30-70 Section 970.3102-05-30-70 Federal Acquisition Regulations System... Principles and Procedures 970.3102-05-30-70 Patent costs and technology transfer costs. (a) For management and operating contracts that do not include the clause at 970.5227-3, Technology Transfer Mission, the...

  20. 48 CFR 970.3102-05-30-70 - Patent costs and technology transfer costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technology transfer costs. 970.3102-05-30-70 Section 970.3102-05-30-70 Federal Acquisition Regulations System... Principles and Procedures 970.3102-05-30-70 Patent costs and technology transfer costs. (a) For management and operating contracts that do not include the clause at 970.5227-3, Technology Transfer Mission, the...

  1. 48 CFR 970.3102-05-30-70 - Patent costs and technology transfer costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technology transfer costs. 970.3102-05-30-70 Section 970.3102-05-30-70 Federal Acquisition Regulations System... Principles and Procedures 970.3102-05-30-70 Patent costs and technology transfer costs. (a) For management and operating contracts that do not include the clause at 970.5227-3, Technology Transfer Mission, the...

  2. 48 CFR 49.304-2 - Submission of settlement proposal (fee only).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of settlement proposal (fee only). 49.304-2 Section 49.304-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement...

  3. 48 CFR 1631.205-70 - FEHBP public relations and advertising costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-70 FEHBP public... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true FEHBP public relations and advertising costs. 1631.205-70 Section 1631.205-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL...

  4. 48 CFR 331.101-70 - Salary rate limitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Salary rate limitation... CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 331.101-70 Salary rate... used to pay the direct salary of an individual at a rate in excess of the Federal Executive Schedule...

  5. 48 CFR 1631.205-78 - FEHBP printed material costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true FEHBP printed material... carrier orders printed material that is available from the Government Printing Office (GPO) under the... COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-78 FEHBP printed...

  6. 48 CFR 2131.109 - Advance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Advance agreements. 2131... PRINCIPLES AND PROCEDURES Applicability 2131.109 Advance agreements. FAR 31.109 is applicable to FEGLI Program contracts, except that precontract costs and nonrecurring costs that exceed $100,000 will not be...

  7. 48 CFR 31.109 - Advance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Advance agreements. 31.109... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 31.109 Advance agreements. (a) The extent of... contractors should seek advance agreement on the treatment of special or unusual costs and on statistical...

  8. 48 CFR 31.109 - Advance agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Advance agreements. 31.109... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 31.109 Advance agreements. (a) The extent of... contractors should seek advance agreement on the treatment of special or unusual costs and on statistical...

  9. 48 CFR 31.109 - Advance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Advance agreements. 31.109... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 31.109 Advance agreements. (a) The extent of... contractors should seek advance agreement on the treatment of special or unusual costs and on statistical...

  10. Non-Binding Arbitration. Alternative Dispute Resolution Series

    DTIC Science & Technology

    1990-09-01

    However, the panel did not accept of an expert in public contract law , and the documentation cf costs submitted by two experts on cement construction. The...expert, and both panel recommended a payment of parties agreed to the contract law expert, $57,000. who was to serve as the neutral party. The attorneys...applying situation. relevant principles from contract law . The arbitrator felt the contractor had justi- Plannin to Use Non-Binding Arbitration fied claims

  11. 32 CFR 22.710 - Assignment of grants administration offices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accessed through the Defense Contract Management Agency hompage at http://www.dcma.mil. (a) Regional... organizations are subject to the university cost principles in OMB Circular A-21. 11 11 See footnote 5 to § 22... footnote 5 to § 22.420(b)(1). (b) Field offices of the Defense Contract Management Command, for grants and...

  12. Marginal-cost contracting in the NHS: results of a preliminary survey.

    PubMed

    Beddow, A J; Cohen, D R

    2001-05-01

    Market disciplines and incentives were expected to improve efficiency in the UK National Health Service following the introduction of an 'internal market' in 1991. An exploratory survey of all Health Authorities and Trusts in the UK was undertaken to investigate whether players in the NHS managed market are behaving as economic theory predicts they should. The focus was on how and to what extent marginal costing has been used in the contracting process and on whether in some instances an inappropriate use of marginal costing may be resulting in inappropriate investment decisions. Twenty of 29 responding Health Authorities (69%) and 16 of 39 Trusts (41%) stated that they had considered purchasing/providing services on a marginal-cost basis and all of these led to contracts. Marginal-cost contracting appears to be fairly commonplace and the process does not appear to be causing insurmountable conflicts between players. Most marginal-cost contracts were specifically to meet waiting-list initiative targets. Overall results suggest that economic principles are not being particularly adhered to, with expansion in output rarely being related to available capacity. As increased responsibility for commissioning passes to primary care teams and local health groups, there are lessons for those involved in this more disaggregated approach to service shaping and service delivery.

  13. 77 FR 11778 - Reform of Federal Policies Relating to Grants and Cooperative Agreements; Cost Principles and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... contracts that that are subject to ``full coverage'' under the Cost Accounting Standards (CAS) as defined at... full Single Audit. These Audits would be strengthened per the ideas in reforms 2-5 (below) to give... the full Single Audit for entities expending more than $3 million would ensure that agencies still...

  14. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2017-03-16

    principle reduce the cost of the weapons being procured in two primary ways:  Contractor optimization of workforce and production facilities. An...MYP contract gives the contractor (e.g., an airplane manufacturer or shipbuilder) confidence that a multiyear stream of business of a known volume...will very likely materialize. This confidence can permit the contractor to make investments in the firm’s workforce and production facilities that are

  15. 48 CFR 2131.205-3 - Bad debts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 2131.205-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL... PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 2131.205-3 Bad debts. Erroneous benefit... the erroneous overpayment or it would not be cost effective to recover the erroneous overpayment. The...

  16. Reaffirming Some Basic Principles in Purchasing and Maintenance.

    ERIC Educational Resources Information Center

    Throop, Harold L., Jr.

    1985-01-01

    Reaffirms necessary elements for the successful operation of college purchasing and maintenance programs (e.g., purchasing calendar, bidding procedures, vendor selection, contracting services, budgeting for maintenance, and workforce analysis). Discusses ways some colleges are saving on operating costs (e.g., solar energy, energy management,…

  17. 48 CFR 1631.200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Scope of subpart. 1631.200 Section 1631.200 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... PROCEDURES Contracts With Commercial Organizations 1631.200 Scope of subpart. The cost principles under this...

  18. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Application procedures. State and local units of government applying for grants under this program will comply... Circulars 74-4 (Cost Principles Applicable to Grants and Contracts with State and Local Governments) and OMB Circular No. A-102 (Uniform Administrative Requirements for Grants-in-Aid to State and local governments...

  19. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Application procedures. State and local units of government applying for grants under this program will comply... Circulars 74-4 (Cost Principles Applicable to Grants and Contracts with State and Local Governments) and OMB Circular No. A-102 (Uniform Administrative Requirements for Grants-in-Aid to State and local governments...

  20. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Application procedures. State and local units of government applying for grants under this program will comply... Circulars 74-4 (Cost Principles Applicable to Grants and Contracts with State and Local Governments) and OMB Circular No. A-102 (Uniform Administrative Requirements for Grants-in-Aid to State and local governments...

  1. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Application procedures. State and local units of government applying for grants under this program will comply... Circulars 74-4 (Cost Principles Applicable to Grants and Contracts with State and Local Governments) and OMB Circular No. A-102 (Uniform Administrative Requirements for Grants-in-Aid to State and local governments...

  2. 40 CFR 35.6610 - Contracts awarded by a contractor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....6610 Section 35.6610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... produce equipment, materials and catalog, off-the-shelf, or manufactured items.) (a) The requirements... requirements regarding specifications in § 35.6555 (a)(6) and (c). (e) The Federal cost principles in 40 CFR 31...

  3. 40 CFR 35.6610 - Contracts awarded by a contractor.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....6610 Section 35.6610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... produce equipment, materials and catalog, off-the-shelf, or manufactured items.) (a) The requirements... requirements regarding specifications in § 35.6555 (a)(6) and (c). (e) The Federal cost principles in 40 CFR 31...

  4. 40 CFR 35.6610 - Contracts awarded by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....6610 Section 35.6610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... produce equipment, materials and catalog, off-the-shelf, or manufactured items.) (a) The requirements... requirements regarding specifications in § 35.6555 (a)(6) and (c). (e) The Federal cost principles in 40 CFR 31...

  5. 40 CFR 35.6610 - Contracts awarded by a contractor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....6610 Section 35.6610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... produce equipment, materials and catalog, off-the-shelf, or manufactured items.) (a) The requirements... requirements regarding specifications in § 35.6555 (a)(6) and (c). (e) The Federal cost principles in 40 CFR 31...

  6. 40 CFR 35.6610 - Contracts awarded by a contractor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....6610 Section 35.6610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... produce equipment, materials and catalog, off-the-shelf, or manufactured items.) (a) The requirements... requirements regarding specifications in § 35.6555 (a)(6) and (c). (e) The Federal cost principles in 40 CFR 31...

  7. Defense Contract Audit Agency Audits of Contractor Compliance with Cost Accounting Standards

    DTIC Science & Technology

    1999-01-11

    20301-1900. The identity of each writer and caller is fully protected. Acronyms ACO CAM CAS CO DCAA DCMC DFARS FAR FAO FMIS GAAP GAAS...Accounting Principles ( GAAP ) and accounting methods accepted for income tax purposes by the Internal Revenue Service. The purpose of GAAP is to report cost...information for financial statement purposes GAAP was developed primarily for stockholder use and protection, not to control expenditures on

  8. A high-throughput in vitro ring assay for vasoactivity using magnetic 3D bioprinting

    PubMed Central

    Tseng, Hubert; Gage, Jacob A.; Haisler, William L.; Neeley, Shane K.; Shen, Tsaiwei; Hebel, Chris; Barthlow, Herbert G.; Wagoner, Matthew; Souza, Glauco R.

    2016-01-01

    Vasoactive liabilities are typically assayed using wire myography, which is limited by its high cost and low throughput. To meet the demand for higher throughput in vitro alternatives, this study introduces a magnetic 3D bioprinting-based vasoactivity assay. The principle behind this assay is the magnetic printing of vascular smooth muscle cells into 3D rings that functionally represent blood vessel segments, whose contraction can be altered by vasodilators and vasoconstrictors. A cost-effective imaging modality employing a mobile device is used to capture contraction with high throughput. The goal of this study was to validate ring contraction as a measure of vasoactivity, using a small panel of known vasoactive drugs. In vitro responses of the rings matched outcomes predicted by in vivo pharmacology, and were supported by immunohistochemistry. Altogether, this ring assay robustly models vasoactivity, which could meet the need for higher throughput in vitro alternatives. PMID:27477945

  9. 48 CFR 52.202-1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition... word or term is defined in FAR Part 31, for use in the cost principles and procedures. (b) The FAR... Index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR...

  10. 48 CFR 831.7001-3 - Books, supplies, and equipment required to be personally owned.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Books, supplies, and... PROCEDURES Contract Cost Principles and Procedures 831.7001-3 Books, supplies, and equipment required to be personally owned. (a) Reimbursement for supplies (including books, equipment, or other supplies) will be made...

  11. 48 CFR 831.7001-3 - Books, supplies, and equipment required to be personally owned.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Books, supplies, and... PROCEDURES Contract Cost Principles and Procedures 831.7001-3 Books, supplies, and equipment required to be personally owned. (a) Reimbursement for supplies (including books, equipment, or other supplies) will be made...

  12. 48 CFR 831.7001-3 - Books, supplies, and equipment required to be personally owned.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Books, supplies, and... PROCEDURES Contract Cost Principles and Procedures 831.7001-3 Books, supplies, and equipment required to be personally owned. (a) Reimbursement for supplies (including books, equipment, or other supplies) will be made...

  13. 48 CFR 831.7001-3 - Books, supplies, and equipment required to be personally owned.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Books, supplies, and... PROCEDURES Contract Cost Principles and Procedures 831.7001-3 Books, supplies, and equipment required to be personally owned. (a) Reimbursement for supplies (including books, equipment, or other supplies) will be made...

  14. 78 FR 32988 - Core Principles and Other Requirements for Designated Contract Markets; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 38 RIN 3038-AD09 Core Principles and Other... regarding Core Principles and Other Requirements for Designated Contract Markets by inserting a missing... regarding Core Principles and Other Requirements for Designated Contract Markets (77 FR 36612, June 19, 2012...

  15. 75 FR 80571 - Core Principles and Other Requirements for Designated Contract Markets

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Part II Commodity Futures Trading Commission 17 CFR Parts 1, 16, and 38 Core Principles and Other... CFR Parts 1, 16, and 38 RIN 3038-AD09 Core Principles and Other Requirements for Designated Contract... Principles 1. Subpart B--Designation as Contract Market 2. Subpart C--Compliance With Rules i. Proposed Sec...

  16. Streamlining the Acquisition Process: Should Program Directors be Granted Contracting Authority

    DTIC Science & Technology

    1989-09-01

    relationship between program directors and contracting officers contradicts basic management principles. One of Fayol’s principles of management is that...Franklin, Stephen G. Principles of Management , Eighth Edition. Homewood, II: Richard D. Irwin, Inc., 1982. Thybony, William W. Government Contracting based

  17. Some Analogies of the Banach Contraction Principle in Fuzzy Modular Spaces

    PubMed Central

    Wongkum, Kittipong; Chaipunya, Parin; Kumam, Poom

    2013-01-01

    We established some theorems under the aim of deriving variants of the Banach contraction principle, using the classes of inner contractions and outer contractions, on the structure of fuzzy modular spaces. PMID:23766681

  18. Purchasing health services abroad: practices of cross-border contracting and patient mobility in six European countries.

    PubMed

    Glinos, Irene A; Baeten, Rita; Maarse, Hans

    2010-05-01

    Contracting health services outside the public, statutory health system entails purchasing capacity from domestic non-public providers or from providers abroad. Over the last decade, these practices have made their way into European health systems, brought about by performance-oriented reforms and EU principles of free movement. The aim of the article is to explain the development, functioning, purposes and possible implications of cross-border contracting. Primary and secondary sources on purchasing from providers abroad have been collected in a systematic way and analysed in a structured frame. We found practices in six European countries. The findings suggest that purchasers from benefit-in-kind systems contract capacity abroad when this responds to unmet demand; pressures domestic providers; and/or offers financial advantages, especially where statutory purchasers compete. Providers which receive patients tend to be located in countries where treatment costs are lower and/or where providers compete. The modalities of purchasing and delivering care abroad vary considerably depending on contracts being centralised or direct, the involvement of middlemen, funding and pricing mechanisms, cross-border pathways and volumes of patient flows. The arrangements and concepts which cross-border contracting relies on suggest that statutory health purchasers, under pressure to deliver value for money and striving for cost-efficiency, experiment with new ways of organising health services for their populations. Copyright (c) 2009 Elsevier Ireland Ltd. All rights reserved.

  19. 48 CFR 49.206-1 - Submission of settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for... settlement proposals if they are determined under generally recognized accounting principles consistently...

  20. 48 CFR 49.105 - Duties of termination contracting officer after issuance of notice of termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105 Duties of termination contracting officer after issuance of notice of termination. (a... principles relating to the settlement of any settlement proposal, including obligations of the contractor...

  1. Contractual considerations in veterinary practice.

    PubMed

    Grossman, M R; Scoggins, G A

    1993-09-01

    Veterinary medicine is a profession based on contract. Many aspects of veterinary practice involve legally enforceable contract obligations. Legal rules established by statutes or court cases govern contract formation, interpretation, and enforcement. This article explains several legal principles governing contract law and applies some of these principles to common contractual settings in veterinary medicine.

  2. 48 CFR 49.201 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.201... strict accounting principles, is the heart of a settlement. (b) The primary objective is to negotiate a...

  3. 48 CFR 1552.211-73 - Level of effort-cost-reimbursement term contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracts without fee, cost-sharing contracts, cost-plus-fixed-fee (CPFF) contracts, cost-plus-incentive-fee contracts (CPIF), and cost-plus-award-fee contracts (CPAF). Level of Effort—Cost-Reimbursement Term Contract... additional effort shall not result in any increase in the fixed fee, if any. If this is a cost-plus-incentive...

  4. 48 CFR 16.405-1 - Cost-plus-incentive-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-incentive-fee... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 16.405-1 Cost-plus-incentive-fee contracts. (a) Description. The cost-plus-incentive-fee contract is a cost-reimbursement contract that...

  5. Guidelines clarify managed care accounting procedures.

    PubMed

    Cheramy, S J; Garner, M

    1989-08-01

    Two new documents offer guidance for accounting issues involved in managed care programs. The American Institute of Certified Public Accountants' Statement of Position 89-5 and HFMA's Principles and Practices Board Statement No. 11 address risk contracting from the perspective of the managed care program and the healthcare provider, respectively. One key issue addressed in the documents is the timing of expense recognition of the costs of providing health services to members of managed care plans.

  6. 48 CFR 16.304 - Cost-plus-incentive-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-incentive-fee...-incentive-fee contracts. A cost-plus-incentive-fee contract is a cost-reimbursement contract that provides... allowable costs to total target costs. Cost-plus-incentive-fee contracts are covered in subpart 16.4...

  7. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  8. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  9. Principles of Social Justice in Educational Research: The Case of Contract Research.

    ERIC Educational Resources Information Center

    Griffiths, Morwenna

    1998-01-01

    Delineates small-scale contract-research principles predicated on an understanding of social justice and of research purposes, epistemological issues, and possibilities for ethical and political action. Principles embrace improvement, knowledge and learning, changed belief systems, collaboration and consultation, openness to other communities,…

  10. 41 CFR 109-40.302 - Standard routing principle.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Standard routing principle. 109-40.302 Section 109-40.302 Public Contracts and Property Management Federal Property... Standard routing principle. (a) Shipments shall be routed using the mode of transportation, or individual...

  11. 48 CFR 2016.307-70 - Contract provisions and clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Level of Effort, in solicitations for negotiated procurements containing labor costs other than maintenance services to be awarded on a cost reimbursement, cost sharing, cost-plus-award fee, cost-plus-fixed... COMMISSION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 2016.307-70...

  12. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  13. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  14. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  15. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  16. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  17. Organizing to Manage Base-Level Service Contracts in the 1990s.

    DTIC Science & Technology

    1986-04-01

    management of service contracts is the present day organizational structure. The structure is flawed and violates basic principles of management . Until the...are classic principles of management . To state the principle I will quote Ernest Dale: "Authority should be commensurate with responsibility. That is

  18. 48 CFR 716.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-sharing contracts. 716.303 Section 716.303 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.303 Cost-sharing...

  19. 48 CFR 716.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Cost-sharing contracts. 716.303 Section 716.303 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.303 Cost-sharing...

  20. 17 CFR 38.1050 - Core Principle 20.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... automated systems, that are reliable, secure, and have adequate scalable capacity; (b) Establish and... CONTRACT MARKETS System Safeguards § 38.1050 Core Principle 20. Each designated contract market shall: (a...

  1. 17 CFR 38.1050 - Core Principle 20.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... automated systems, that are reliable, secure, and have adequate scalable capacity; (b) Establish and... CONTRACT MARKETS System Safeguards § 38.1050 Core Principle 20. Each designated contract market shall: (a...

  2. 48 CFR 1316.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-plus-award-fee... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.405-2 Cost-plus-award-fee contracts. Insert clause 1352.216-72, Determination of Award Fee, in all cost-plus-award-fee contracts. ...

  3. 48 CFR 216.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-award-fee... Contracts 216.405-2 Cost-plus-award-fee contracts. (b) Application. The cost-plus-award-fee (CPAF) contract... avoid— (1) Establishing cost-plus-fixed-fee contracts when the criteria for cost-plus-fixed-fee...

  4. 48 CFR 216.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 216.306 Cost-plus-fixed-fee contracts. (c) Limitations. (i) Except as provided in...

  5. 48 CFR 16.304 - Cost-plus-incentive-fee contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Cost-plus-incentive-fee contracts. 16.304 Section 16.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 16.304 Cost-plus...

  6. 48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...

  7. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  8. 48 CFR 15.408 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.408... contemplated. (b) Price Reduction for Defective Certified Cost or Pricing Data. The contracting officer shall... Certified Cost or Pricing Data, in solicitations and contracts when it is contemplated that certified cost...

  9. 48 CFR 1516.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-plus-award-fee... AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1516.405-2 Cost-plus-award-fee contracts. ...

  10. 48 CFR 29.402-2 - Foreign cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Foreign cost-reimbursement... GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 29.402-2 Foreign cost-reimbursement contracts. (a) The contracting officer shall insert the clause at 52.229-8, Taxes—Foreign Cost-Reimbursement...

  11. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    DOE PAGES

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    2015-02-04

    We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less

  12. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    NASA Astrophysics Data System (ADS)

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    2015-02-01

    Over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. This study relies on a sample of 1113 contracts for residential PV systems installed in 2010-2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer’s discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. In addition, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.

  13. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less

  14. 48 CFR 236.271 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...

  15. 48 CFR 49.403 - Termination of cost-reimbursement contracts for default.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement contracts for default. 49.403 Section 49.403 Federal Acquisition Regulations System FEDERAL... of cost-reimbursement contracts for default. (a) The right to terminate a cost-reimbursement contract... case by the clause. (b) Settlement of a cost-reimbursement contract terminated for default is subject...

  16. 48 CFR 1316.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 1316.405 Section 1316.405 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.405 Cost-reimbursement...

  17. 48 CFR 916.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 916.405 Section 916.405 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405 Cost-reimbursement...

  18. 48 CFR 3416.303 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost-sharing contracts. 3416.303 Section 3416.303 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 3416.303...

  19. Comparison of Navy and Private-Sector Construction Costs

    DTIC Science & Technology

    1997-09-01

    contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar

  20. 48 CFR 416.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Cost-plus-award-fee... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 416.405-2 Cost-plus-award-fee contracts. The HCA may designate an acquisition official other than the contracting officer as the fee...

  1. 48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...

  2. 48 CFR 1631.205-74 - FEHBP losses on other contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT... carry forward” principle that is fundamental to continuing insurance contracts that are based on...

  3. Case-mix specialization in the market for hospital services.

    PubMed Central

    Farley, D E; Hogan, C

    1990-01-01

    Historically, cost-based reimbursement encouraged hospitals to compete on the basis of quality, leading to duplication of services and other inefficient behavior. More recently, prospective payment, selective contracting, and other innovations in reimbursement have strengthened incentives for more efficient hospital operations. In principle, hospitals may be able to reduce their costs by limiting the array of services they provide, but there has been little empirical evidence that U.S. hospitals are moving toward greater specialization or that specialization leads to cost savings. This article explores recent changes in case-mix specialization and the relationship of these changes to hospital costs. It first describes an index of specialization derived from Information Theory and shows that this index provides intuitively reasonable results in characterizing patterns of specialization across hospitals. The analysis then demonstrates that specialization, as measured by this index, in fact increased from 1980 through 1985; that specialization can indeed lower hospital costs; and that increases in specialization have been largest in those hospitals with the greatest incentives to reduce costs. PMID:2123838

  4. 48 CFR 215.404-74 - Fee requirements for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fee requirements for cost... NEGOTIATION Contract Pricing 215.404-74 Fee requirements for cost-plus-award-fee contracts. In developing a fee objective for cost-plus-award-fee contracts, the contracting officer shall— (a) Follow the...

  5. 48 CFR 42.707 - Cost-sharing rates and limitations on indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... final indirect cost rate ceiling in a contract. Examples of such circumstances are when the proposed... ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42... authorized, may call for the contractor to participate in the costs of the contract by accepting indirect...

  6. 48 CFR 49.100 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 49.100 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.100 Scope of subpart. (a) This subpart deals with— (1) The...; and (4) Settlement agreements. (b) Additional principles applicable to the termination for convenience...

  7. 48 CFR 16.305 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 16.305 Cost-plus-award... consisting of (a) a base amount (which may be zero) fixed at inception of the contract and (b) an award amount, based upon a judgmental evaluation by the Government, sufficient to provide motivation for...

  8. 48 CFR 1552.217-74 - Option for increased quantity-cost-plus-award-fee contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... quantity-cost-plus-award-fee contract. 1552.217-74 Section 1552.217-74 Federal Acquisition Regulations... Texts of Provisions and Clauses 1552.217-74 Option for increased quantity—cost-plus-award-fee contract. As prescribed in 1517.208(e), insert this contract clause in cost-plus-award-fee term contracts when...

  9. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  10. 48 CFR 52.242-1 - Notice of Intent To Disallow Costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in solicitations and contracts when a cost-reimbursement contract, a fixed-price incentive contract, or a contract providing for price redetermination is contemplated: Notice of Intent To Disallow Costs... rights to take exception to incurred costs. (End of clause) ...

  11. 48 CFR 16.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 16.405-2 Cost-plus-award-fee... during performance and that is sufficient to provide motivation for excellence in the areas of cost... consisting of (1) a base amount fixed at inception of the contract, if applicable and at the discretion of...

  12. 48 CFR 46.303 - Cost-reimbursement supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement supply contracts. 46.303 Section 46.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.303 Cost-reimbursement supply contracts. The...

  13. 48 CFR 46.305 - Cost-reimbursement service contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement service contracts. 46.305 Section 46.305 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.305 Cost-reimbursement service contracts. The...

  14. 48 CFR 30.201-4 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 30.201-4 Contract clauses. (a) Cost Accounting Standards. (1) The contracting officer shall insert the clause at FAR 52.230-2, Cost... cost accounting practices (applicable to CAS-covered contracts only), and to follow disclosed and...

  15. 48 CFR 215.403-5 - Instructions for submission of cost or pricing data or information other than cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... submission of cost or pricing data or information other than cost or pricing data. 215.403-5 Section 215.403... DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403-5 Instructions for submission of cost or pricing data or information other than cost or pricing data. When the...

  16. 48 CFR 1515.404-475 - Cost realism.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1515.404-475 Cost realism. The EPA structured approach is not required when the contracting officer is evaluating cost realism in a competitive...

  17. 48 CFR 28.307 - Insurance under cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Insurance under cost-reimbursement contracts. 28.307 Section 28.307 Federal Acquisition Regulations System FEDERAL ACQUISITION...-reimbursement contracts. Cost-reimbursement contracts (and subcontracts, if the terms of the prime contract are...

  18. 48 CFR 32.110 - Payment of subcontractors under cost-reimbursement prime contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under cost-reimbursement prime contracts. 32.110 Section 32.110 Federal Acquisition Regulations System... Purchase Financing 32.110 Payment of subcontractors under cost-reimbursement prime contracts. If the contractor makes financing payments to a subcontractor under a cost-reimbursement prime contract, the...

  19. The consequences of hospital autonomization in Colombia: a transaction cost economics analysis.

    PubMed

    Castano, Ramon; Mills, Anne

    2013-03-01

    Granting autonomy to public hospitals in developing countries has been common over recent decades, and implies a shift from hierarchical to contract-based relationships with health authorities. Theory on transactions costs in contractual relationships suggests they stem from relationship-specific investments and contract incompleteness. Transaction cost economics argues that the parties involved in exchanges seek to reduce transaction costs. The objective of this research was to analyse the relationships observed between purchasers and the 22 public hospitals of the city of Bogota, Colombia, in order to understand the role of relationship-specific investments and contract incompleteness as sources of transaction costs, through a largely qualitative study. We found that contract-based relationships showed relevant transaction costs associated mainly with contract incompleteness, not with relationship-specific investments. Regarding relationships between insurers and local hospitals for primary care services, compulsory contracting regulations locked-in the parties to the contracts. For high-complexity services (e.g. inpatient care), no restrictions applied and relationships suggested transaction-cost minimizing behaviour. Contract incompleteness was found to be a source of transaction costs on its own. We conclude that transaction costs seemed to play a key role in contract-based relationships, and contract incompleteness by itself appeared to be a source of transaction costs. The same findings are likely in other contexts because of difficulties in defining, observing and verifying the contracted products and the underlying information asymmetries. The role of compulsory contracting might be context-specific, although it is likely to emerge in other settings due to the safety-net role of public hospitals.

  20. 48 CFR 49.114 - Unsettled contract changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unsettled contract changes. 49.114 Section 49.114 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.114 Unsettled contract changes. (a) Before...

  1. 48 CFR 3028.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 3028.311 Section 3028.311... contract clause on liability insurance under cost-reimbursement contracts. ...

  2. 48 CFR 15.406-2 - Certificate of current cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cost or pricing data. 15.406-2 Section 15.406-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.406-2 Certificate of current cost or pricing data. (a) When certified cost or pricing data are...

  3. 48 CFR 15.406-2 - Certificate of current cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost or pricing data. 15.406-2 Section 15.406-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.406-2 Certificate of current cost or pricing data. (a) When certified cost or pricing data are...

  4. 48 CFR 15.406-2 - Certificate of current cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cost or pricing data. 15.406-2 Section 15.406-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.406-2 Certificate of current cost or pricing data. (a) When certified cost or pricing data are...

  5. 48 CFR 22.101-2 - Contract pricing and administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement contracts or for recognition of costs in pricing fixed-price contracts if they result in... organizations to settle disputes. (c) Strikes normally result in changing patterns of cost incurrence and... recognition of costs in pricing fixed-price contracts. Certain costs may increase because of strikes; e.g...

  6. 48 CFR 22.101-2 - Contract pricing and administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-reimbursement contracts or for recognition of costs in pricing fixed-price contracts if they result in... organizations to settle disputes. (c) Strikes normally result in changing patterns of cost incurrence and... recognition of costs in pricing fixed-price contracts. Certain costs may increase because of strikes; e.g...

  7. 48 CFR 216.405-1 - Cost-plus-incentive-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-incentive-fee... Contracts 216.405-1 Cost-plus-incentive-fee contracts. See PGI 216.405-1 for guidance on the use of cost-plus-incentive-fee contracts. [71 FR 39007, July 11, 2006] ...

  8. 48 CFR 1516.303-73 - Types of cost-sharing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., cost matching, or other in-kind contributions. (b) In-kind contributions represent non-cash... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Types of cost-sharing. 1516... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1516.303-73 Types of...

  9. 48 CFR 1315.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special cost or pricing... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1315.407 Special cost or pricing areas. ...

  10. 48 CFR 15.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Special cost or pricing... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.407 Special cost or pricing areas. ...

  11. 48 CFR 216.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 216.405 Section 216.405 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contracts 216.405 Cost-reimbursement incentive contracts. ...

  12. 48 CFR 1815.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Special cost or pricing... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.407 Special cost or pricing areas. ...

  13. 48 CFR 916.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.306 Cost-plus-fixed-fee... application of the statutory price or fee limitations. [49 FR 11955, Mar. 28, 1984, as amended at 59 FR 9105...

  14. 48 CFR 52.216-11 - Cost Contract-No Fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Cost Contract-No Fee. 52....216-11 Cost Contract—No Fee. As prescribed in 16.307(e), insert the following clause in solicitations and contracts when a cost-reimbursement contract is contemplated that provides no fee and is not a...

  15. 48 CFR 225.7303 - Pricing acquisitions for FMS.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pricing acquisitions for... Military Sales 225.7303 Pricing acquisitions for FMS. (a) Price FMS contracts using the same principles used in pricing other defense contracts. However, application of the pricing principles in FAR parts 15...

  16. 48 CFR 1428.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 1428.311 Section 1428.311... under cost-reimbursement contracts. ...

  17. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost-plus-award-fee contracts. 915.404-4-72 Section 915.404-4-72 Federal Acquisition Regulations System....404-4-72 Special considerations for cost-plus-award-fee contracts. (a) When a contract is to be awarded on a cost-plus-award-fee basis several special considerations are appropriate. Fee objectives for...

  18. 48 CFR 1828.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 1828.311 Section 1828.311... insurance under cost-reimbursement contracts. ...

  19. 48 CFR 16.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 16.405 Section 16.405 Federal Acquisition Regulations System FEDERAL ACQUISITION...-reimbursement incentive contracts. See 16.301 for requirements applicable to all cost-reimbursement contracts...

  20. 48 CFR 1615.406-2 - Certificate of accurate cost or pricing data for community-rated carriers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost or pricing data for community-rated carriers. 1615.406-2 Section 1615.406-2 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.406-2 Certificate of accurate cost or pricing data for community-rated carriers. The contracting officer will require a carrier...

  1. The impact of healthcare reform in the Netherlands.

    PubMed

    Rutten, Frans

    2004-01-01

    In 1987, the Dekker committee proposed managed competition as the dominant principle for reforming healthcare in The Netherlands. Considerable progress has been made in implementing the Dekker proposal, such as risk-adjusted capitation of Sick Funds, yearly open enrollment and selective contracting with providers. The centre-right government, which came to power in 2003, plans to implement the final steps in the coming years, which will drastically change pharmaceutical policies and shift power from central government to regional actors in healthcare. The current price reference system, which was initiated in 1991, has failed in containing expenditure or providing incentives towards efficiency. For new drugs, which can not be clustered in the price reference system or for which the producer wants a premium price, a pharmacoeconomic study and budget impact analysis is formally required from 2005 onwards. This fourth hurdle may limit access to new drugs, which contribute considerably to expenditure or for which relative efficiency is above a certain cost-effectiveness threshold. In line with the Dekker principle, insurance companies are expected to step into the market and initiate policies to reduce costs. However, the government seems somewhat reluctant to abandon instruments belonging to old supply-side regulation. Given the current healthcare cost explosion, which coincides with an economic recession, it remains to be seen whether politicians will really shift the power to the insurers and not return to traditional cost-containment policies.

  2. 48 CFR 228.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 228.311 Section 228.311 Federal... liability insurance under cost-reimbursement contracts. ...

  3. 29 CFR 4.133 - Beneficiary of contract services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Beneficiary of contract services. 4.133 Section 4.133 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Particular Application of Contract Coverage Principles § 4.133...

  4. 29 CFR 4.133 - Beneficiary of contract services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Beneficiary of contract services. 4.133 Section 4.133 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Particular Application of Contract Coverage Principles § 4.133...

  5. 29 CFR 4.133 - Beneficiary of contract services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Beneficiary of contract services. 4.133 Section 4.133 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Particular Application of Contract Coverage Principles § 4.133...

  6. 29 CFR 4.134 - Contracts outside the Act's coverage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Particular Application of Contract Coverage Principles § 4.134... financial assistance may be provided for such contracts under Federal law or the terms and conditions specified in Federal law may govern the award and operation of the contract. (b) Further, as already noted...

  7. 48 CFR 2015.209-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 2052.215-71, Project Officer Authority in applicable solicitations and contracts for cost-reimbursement, cost-plus-fixed-fee, cost-plus-award-fee, cost sharing, labor-hour or time-and-materials, including... for cost type contracts; (2) Section 2052.215-75 Alternate 1 may be used for all solicitations for...

  8. 41 CFR 102-118.535 - Are there principles governing my agency's TSP debt collection procedures?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are there principles governing my agency's TSP debt collection procedures? 102-118.535 Section 102-118.535 Public Contracts and... REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Claims and Appeal Procedures General Agency...

  9. 41 CFR Appendix A to Subpart A of... - 3-Key Points and Principles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false 3-Key Points and Principles A Appendix A to Subpart A of Part 102 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 3-FEDERAL ADVISORY COMMITTEE...

  10. Military Personnel Procurement Resources Report

    DTIC Science & Technology

    1991-05-28

    directed at enlistment in the Military Service. Include cost of advertising agency contract spent on marketing research (to include cost of advertising...programs. Include cost of advertising agency contract spent on marketing research (to include cost of advertising agency subcontractors). 7. Printed...Include cost of advertising agency contract spent on marketing research (to include cost of advertising agency sub- contractors). 7. Printed

  11. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., include unallowable interest costs, or use improper cost of money rates or computations. Contracting... contracts, including cost-reimbursement subcontracts thereunder; (2) Negotiating indirect cost rates; (3... appropriate they serve to express the parties' understanding and avoid possible subsequent disputes or...

  12. 48 CFR 52.203-10 - Price or Fee Adjustment for Illegal or Improper Activity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract and the total cost and fee under a cost-type contract by the amount of profit or fee determined as... Regulation. (b) The price or fee reduction referred to in paragraph (a) of this clause shall be— (1) For cost...-incentive contracts, the Government may— (i) Reduce the contract target price and contract target profit...

  13. 48 CFR 1315.407-4 - Should-cost review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Should-cost review. 1315.407-4 Section 1315.407-4 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1315.407-4 Should-cost review. The...

  14. 48 CFR 2815.407-4 - Should-cost review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Should-cost review. 2815.407-4 Section 2815.407-4 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Contracting Methods and Contract Types CONTRACTING BY NEGOTIATION Contract Pricing 2815.407-4 Should-cost review. In...

  15. 48 CFR 749.111-70 - Termination settlement review boards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 749.111-70 Termination.... Delegate members of the board shall have broad business and contracting experience and shall be senior...

  16. A Proposal for Qualification Standards as a Contracting Officer in the Naval Facilities Engineering Command.

    DTIC Science & Technology

    1985-06-01

    4. Government Contract Law , DMET PPM 302 (JT); two weeks in length...ccitent: reviews basic legal principles and sources of contract law , modifications, termina- tions, remedies, interpretation of contract language...Governmepnt Contract Law PPM 302 (JT) ____ _____ Recomripnded Optional Courses 1. Advanced Contract Administration PPM 304 (IT) _ ___ _____ 2. Management of

  17. Guidelines for cost control and analysis of cost-type research and development contracts

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  18. 48 CFR 49.115 - Settlement of terminated incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of terminated incentive contracts. 49.115 Section 49.115 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.115 Settlement of terminated...

  19. 48 CFR 215.408 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY....215-11, Price Reduction for Defective Cost or Pricing Data—Modifications; (ii) FAR 52.215-12, Subcontractor Cost or Pricing Data; or (iii) FAR 52.215-13, Subcontractor Cost or Pricing Data—Modifications. (2...

  20. 48 CFR 215.403-3 - Requiring information other than cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... other than cost or pricing data. 215.403-3 Section 215.403-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403-3 Requiring information other than cost or pricing data...

  1. 48 CFR 215.403-3 - Requiring information other than cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... other than cost or pricing data. 215.403-3 Section 215.403-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403-3 Requiring information other than cost or pricing data...

  2. 48 CFR 215.403-3 - Requiring information other than cost or pricing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... other than cost or pricing data. 215.403-3 Section 215.403-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403-3 Requiring information other than cost or pricing data...

  3. 48 CFR 5152.245-9001 - Government property for installation support services (cost-reimbursement contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation support services (cost-reimbursement contracts). 5152.245-9001 Section 5152.245-9001 Federal... CONTRACT CLAUSES 5152.245-9001 Government property for installation support services (cost-reimbursement contracts). As prescribed in 5145.302-3(S-91), insert the following clause: Government Property for...

  4. 48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...

  5. 48 CFR 15.403-5 - Instructions for submission of certified cost or pricing data and data other than certified cost...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... submission of certified cost or pricing data and data other than certified cost or pricing data. 15.403-5... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-5 Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data. (a) Taking into...

  6. 48 CFR 15.403-5 - Instructions for submission of certified cost or pricing data and data other than certified cost...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... submission of certified cost or pricing data and data other than certified cost or pricing data. 15.403-5... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-5 Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data. (a) Taking into...

  7. 48 CFR 15.403-5 - Instructions for submission of certified cost or pricing data and data other than certified cost...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... submission of certified cost or pricing data and data other than certified cost or pricing data. 15.403-5... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-5 Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data. (a) Taking into...

  8. 48 CFR 15.403-5 - Instructions for submission of certified cost or pricing data and data other than certified cost...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... submission of certified cost or pricing data and data other than certified cost or pricing data. 15.403-5... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-5 Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data. (a) Taking into...

  9. 48 CFR 15.403-5 - Instructions for submission of certified cost or pricing data and data other than certified cost...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... submission of certified cost or pricing data and data other than certified cost or pricing data. 15.403-5... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-5 Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data. (a) Taking into...

  10. 48 CFR 1852.216-83 - Fixed price incentive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Price Incentive (OCT 1996) The target cost of this contract is $___. The Target profit of this contract is $___. The target price (target cost plus target profit) of this contract is $___. [The ceiling price is $___.] The cost sharing for target cost underruns is: Government ___percent; Contractor...

  11. 48 CFR 1852.216-83 - Fixed price incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Price Incentive (OCT 1996) The target cost of this contract is $___. The Target profit of this contract is $___. The target price (target cost plus target profit) of this contract is $___. [The ceiling price is $___.] The cost sharing for target cost underruns is: Government ___percent; Contractor...

  12. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...

  13. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2008-02-01

    liabilities (e.g., accounts payable). This ratio can be compared to the firm’s weighted average cost of capital ( WACC ). WACC is the cost of debt plus the cost...RatioCost of Debt Marginal Tax Rate Risk-Free Rate Cost of Equity Risk Premium Industry Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice...estimates the levered WACC as the discount rate, and finally calculates the NPV of the contract. Specific model input includes profit policy levers

  14. The Evolution of the Council of Academic Hospitals of Ontario Statement of Principles--A Successful Harmonization Initiative

    ERIC Educational Resources Information Center

    Porter, Katie; Lampson, Sarah

    2011-01-01

    To improve efficiency, consistency and transparency in clinical trial contract negotiations with industry sponsors, a Council of Academic Hospitals of Ontario (CAHO) committee facilitated the development of standard principles for member hospitals to follow during contract negotiation. Hospitals were encouraged to provide a link to the CAHO…

  15. 17 CFR Appendix B to Part 38 - Guidance on, and Acceptable Practices in, Compliance With Core Principles

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... decision-making and implementation of emergency intervention in the market. At a minimum, the DCM must have... COMMODITY FUTURES TRADING COMMISSION DESIGNATED CONTRACT MARKETS Pt. 38, App. B Appendix B to Part 38... the core principle is illustrative only of the types of matters a designated contract market may...

  16. 42 CFR 417.584 - Payment to HMOs or CMPs with risk contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CMP. (a) Principle of payment. CMS makes monthly advance payments equivalent to the HMO's or CMP's per... subsequent monthly payments to take account of the difference. (d) Reduction of payments. If an HMO or CMP... 1998, HMOs or CMPs with risk contracts will be paid in accordance with principles contained in subpart...

  17. 48 CFR 831.7001 - Allowable costs under cost reimbursement vocational rehabilitation and education contracts or...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Allowable costs under cost reimbursement vocational rehabilitation and education contracts or agreements. 831.7001 Section 831.7001 Federal... reimbursement vocational rehabilitation and education contracts or agreements. ...

  18. 48 CFR 15.403-2 - Other circumstances where certified cost or pricing data are not required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... certified cost or pricing data are not required. 15.403-2 Section 15.403-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-2 Other circumstances where certified cost or pricing data are not required. (a...

  19. 48 CFR 15.403-2 - Other circumstances where certified cost or pricing data are not required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... certified cost or pricing data are not required. 15.403-2 Section 15.403-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-2 Other circumstances where certified cost or pricing data are not required. (a...

  20. 48 CFR 15.403-2 - Other circumstances where certified cost or pricing data are not required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... certified cost or pricing data are not required. 15.403-2 Section 15.403-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-2 Other circumstances where certified cost or pricing data are not required. (a...

  1. 48 CFR 15.403-2 - Other circumstances where certified cost or pricing data are not required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... certified cost or pricing data are not required. 15.403-2 Section 15.403-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403-2 Other circumstances where certified cost or pricing data are not required. (a...

  2. 48 CFR 52.229-8 - Taxes-Foreign Cost-Reimbursement Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Reimbursement Contracts. 52.229-8 Section 52.229-8 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.229-8 Taxes—Foreign Cost-Reimbursement Contracts. As prescribed in 29.402-2(a), insert the following clause: Taxes—Foreign Cost-Reimbursement Contracts (MAR 1990) (a) Any tax or duty from which the...

  3. 48 CFR 328.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 328.311 Section 328.311 Federal... Insurance 328.311 Solicitation provision and contract clause on liability insurance under cost-reimbursement...

  4. Utilizing Physiological Principles of Motor Unit Recruitment to Reduce Fatigability of Electrically-Evoked Contractions: A Narrative Review.

    PubMed

    Barss, Trevor S; Ainsley, Emily N; Claveria-Gonzalez, Francisca C; Luu, M John; Miller, Dylan J; Wiest, Matheus J; Collins, David F

    2018-04-01

    Neuromuscular electrical stimulation (NMES) is used to produce contractions to restore movement and reduce secondary complications for individuals experiencing motor impairment. NMES is conventionally delivered through a single pair of electrodes over a muscle belly or nerve trunk using short pulse durations and frequencies between 20 and 40Hz (conventional NMES). Unfortunately, the benefits and widespread use of conventional NMES are limited by contraction fatigability, which is in large part because of the nonphysiological way that contractions are generated. This review provides a summary of approaches designed to reduce fatigability during NMES, by using physiological principles that help minimize fatigability of voluntary contractions. First, relevant principles of the recruitment and discharge of motor units (MUs) inherent to voluntary contractions and conventional NMES are introduced, and the main mechanisms of fatigability for each contraction type are briefly discussed. A variety of NMES approaches are then described that were designed to reduce fatigability by generating contractions that more closely mimic voluntary contractions. These approaches include altering stimulation parameters, to recruit MUs in their physiological order, and stimulating through multiple electrodes, to reduce MU discharge rates. Although each approach has unique advantages and disadvantages, approaches that minimize MU discharge rates hold the most promise for imminent translation into rehabilitation practice. The way that NMES is currently delivered limits its utility as a rehabilitative tool. Reducing fatigability by delivering NMES in ways that better mimic voluntary contractions holds promise for optimizing the benefits and widespread use of NMES-based programs. Copyright © 2017 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  5. An Optimization Principle for Deriving Nonequilibrium Statistical Models of Hamiltonian Dynamics

    NASA Astrophysics Data System (ADS)

    Turkington, Bruce

    2013-08-01

    A general method for deriving closed reduced models of Hamiltonian dynamical systems is developed using techniques from optimization and statistical estimation. Given a vector of resolved variables, selected to describe the macroscopic state of the system, a family of quasi-equilibrium probability densities on phase space corresponding to the resolved variables is employed as a statistical model, and the evolution of the mean resolved vector is estimated by optimizing over paths of these densities. Specifically, a cost function is constructed to quantify the lack-of-fit to the microscopic dynamics of any feasible path of densities from the statistical model; it is an ensemble-averaged, weighted, squared-norm of the residual that results from submitting the path of densities to the Liouville equation. The path that minimizes the time integral of the cost function determines the best-fit evolution of the mean resolved vector. The closed reduced equations satisfied by the optimal path are derived by Hamilton-Jacobi theory. When expressed in terms of the macroscopic variables, these equations have the generic structure of governing equations for nonequilibrium thermodynamics. In particular, the value function for the optimization principle coincides with the dissipation potential that defines the relation between thermodynamic forces and fluxes. The adjustable closure parameters in the best-fit reduced equations depend explicitly on the arbitrary weights that enter into the lack-of-fit cost function. Two particular model reductions are outlined to illustrate the general method. In each example the set of weights in the optimization principle contracts into a single effective closure parameter.

  6. The new international certification and design principles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heijnen, W.H.P.M.; Heineman, H.

    1995-12-01

    ISO/TC 67 deals with standardization of Equipment for the Petroleum and Natural Gas Industries at a global level. The paper will provide the reader with insight in the Certification system as well as its link with Design. It will explain how the total process fits in the business structure of the Petroleum and Natural Gas Industry, with the focus on the emerging concepts such as partnering, turn key contracts, the developments in the EC and the need to reduce costs at a global basis. The paper will also address the topic of Design Principles based on the results of themore » study performed for ISO/TC 67. The paper will provide a framework that can be used by the industry in how to deal with issues such as, there shall the activity of the Operator be focused on when ordering equipment or services and how the manufacturer or service provider should prepare himself to become an equal partner with regard to the required equipment, service and its associated technology now and in the future. In the changing world with ever increasing focus on Health, Safety and Environment (HSE), the topic efficiency, technology, equipment performance and functionality should not be overlooked or been given less attention. The Certification and Design principles, implemented in standards, aim predominantly at Fitness for Purpose of equipment and/or services to regain the balance. A further aim is to limit consequential costs due to deficiencies in the broadest sense, allowing the Petroleum and Natural Gas Industry to produce oil and gas in a cost effective manner with the highest possible HSE targets.« less

  7. 29 CFR 4.124-4.129 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Specific Exclusions §§ 4.124-4.129 [Reserved] Particular Application of Contract Coverage Principles ...

  8. 48 CFR 52.216-10 - Incentive Fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determined as provided in this contract. (b) Target cost and target fee. The target cost and target fee... (d) below. (1) Target cost, as used in this contract, means the estimated cost of this contract as initially negotiated, adjusted in accordance with paragraph (d) below. (2) Target fee, as used in this...

  9. 48 CFR 52.216-10 - Incentive Fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determined as provided in this contract. (b) Target cost and target fee. The target cost and target fee... (d) below. (1) Target cost, as used in this contract, means the estimated cost of this contract as initially negotiated, adjusted in accordance with paragraph (d) below. (2) Target fee, as used in this...

  10. 26 CFR 1.460-5 - Cost allocation rules.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... rules. (a) Overview. This section prescribes methods of allocating costs to long-term contracts... section provides rules concerning consistency in method of allocating costs to long-term contracts. (b... paragraph (b)(2) of this section, a taxpayer must allocate costs to each long-term contract subject to the...

  11. 26 CFR 1.460-5 - Cost allocation rules.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... rules. (a) Overview. This section prescribes methods of allocating costs to long-term contracts... section provides rules concerning consistency in method of allocating costs to long-term contracts. (b... paragraph (b)(2) of this section, a taxpayer must allocate costs to each long-term contract subject to the...

  12. 26 CFR 1.460-5 - Cost allocation rules.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... rules. (a) Overview. This section prescribes methods of allocating costs to long-term contracts... section provides rules concerning consistency in method of allocating costs to long-term contracts. (b... paragraph (b)(2) of this section, a taxpayer must allocate costs to each long-term contract subject to the...

  13. 26 CFR 1.460-5 - Cost allocation rules.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... rules. (a) Overview. This section prescribes methods of allocating costs to long-term contracts... section provides rules concerning consistency in method of allocating costs to long-term contracts. (b... paragraph (b)(2) of this section, a taxpayer must allocate costs to each long-term contract subject to the...

  14. 48 CFR 52.229-9 - Taxes-Cost-Reimbursement Contracts With Foreign Governments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Taxes-Cost-Reimbursement... Provisions and Clauses 52.229-9 Taxes—Cost-Reimbursement Contracts With Foreign Governments. As prescribed in 29.402-2(b), insert the following clause: Taxes—Cost-Reimbursement Contracts With Foreign Governments...

  15. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...

  16. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  17. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  18. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  19. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  20. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  1. 48 CFR 228.307 - Insurance under cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Insurance under cost-reimbursement contracts. 228.307 Section 228.307 Federal Acquisition Regulations System DEFENSE ACQUISITION....307 Insurance under cost-reimbursement contracts. ...

  2. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... data. 1815.403 Section 1815.403 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data. ...

  3. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... data. 1815.403 Section 1815.403 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data. ...

  4. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... data. 1815.403 Section 1815.403 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data. ...

  5. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... data. 1815.403 Section 1815.403 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data. ...

  6. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... data. 1815.403 Section 1815.403 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data. ...

  7. 48 CFR 32.704 - Limitation of cost or funds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.704 Limitation of cost or funds... contracting officer shall promptly give the contractor written notice of the decision not to provide funds. (b...

  8. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  9. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  10. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  11. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  12. Option pricing: a flexible tool to disseminate shared savings contracts.

    PubMed

    Friedberg, Mark W; Buendia, Anthony M; Lauderdale, Katherine E; Hussey, Peter S

    2013-08-01

    Due to volatility in healthcare costs, shared savings contracts can create systematic financial losses for payers, especially when contracting with smaller providers. To improve the business case for shared savings, we calculated the prices of financial options that payers can "sell" to providers to offset these losses. Using 2009 to 2010 member-level total cost of care data from a large commercial health plan, we calculated option prices by applying a bootstrap simulation procedure. We repeated these simulations for providers of sizes ranging from 500 to 60,000 patients and for shared savings contracts with and without key design features (minimum savings thresholds,bonus caps, cost outlier truncation, and downside risk) and under assumptions of zero, 1%, and 2% real cost reductions due to the shared savings contracts. Assuming no real cost reduction and a 50% shared savings rate, per patient option prices ranged from $225 (3.1% of overall costs) for 500-patient providers to $23 (0.3%) for 60,000-patient providers. Introducing minimum savings thresholds, bonus caps, cost outlier truncation, and downside risk reduced these option prices. Option prices were highly sensitive to the magnitude of real cost reductions. If shared savings contracts cause 2% reductions in total costs, option prices fall to zero for all but the smallest providers. Calculating the prices of financial options that protect payers and providers from downside risk can inject flexibility into shared savings contracts, extend such contracts to smaller providers, and clarify the tradeoffs between different contract designs, potentially speeding the dissemination of shared savings.

  13. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... research and development contracts. 46.308 Section 46.308 Federal Acquisition Regulations System FEDERAL... research and development contracts. The contracting officer shall insert the clause at 52.246-8, Inspection of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  14. 48 CFR 215.404-4 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.404-4... prenegotiation profit or fee objective on any negotiated contract action when cost or pricing data is obtained... analysis when assessing cost realism in competitive acquisitions. (2) When using a structured approach, the...

  15. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research and development contracts. 46.308 Section 46.308 Federal Acquisition Regulations System FEDERAL... research and development contracts. The contracting officer shall insert the clause at 52.246-8, Inspection of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  16. 48 CFR 3028.307 - Insurance under cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Insurance under cost-reimbursement contracts. 3028.307 Section 3028.307 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Insurance 3028.307 Insurance under cost-reimbursement contracts. ...

  17. 48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...

  18. 32 CFR 203.6 - Cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Cost principles. 203.6 Section 203.6 National... Cost principles. (a) Non-profit contractors must comply with the cost principles in OMB Circular A-122...) For-profit contractors and subcontractors must comply with the cost principles in the FAR (48 CFR part...

  19. 48 CFR 15.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or pricing data. 15.403 Section 15.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403 Obtaining certified cost or pricing data. ...

  20. 48 CFR 15.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or pricing data. 15.403 Section 15.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403 Obtaining certified cost or pricing data. ...

  1. 48 CFR 15.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or pricing data. 15.403 Section 15.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403 Obtaining certified cost or pricing data. ...

  2. 48 CFR 215.403 - Obtaining cost or price data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... data. 215.403 Section 215.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403 Obtaining cost or price data. ...

  3. 48 CFR 215.403 - Obtaining cost or price data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... data. 215.403 Section 215.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403 Obtaining cost or price data. ...

  4. 48 CFR 15.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or pricing data. 15.403 Section 15.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403 Obtaining certified cost or pricing data. ...

  5. 48 CFR 15.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... or pricing data. 15.403 Section 15.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.403 Obtaining certified cost or pricing data. ...

  6. 48 CFR 15.407-1 - Defective certified cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Defective certified cost or pricing data. (a) If, before agreement on price, the contracting officer learns... based on an agreement about the total cost of the contract and there was no agreement about the cost of..., based on prime contract progress billings or deliveries, which included payments for a completed and...

  7. 26 CFR 1.460-0 - Outline of regulations under section 460.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... total allocable contract costs. (iv) Pre-contracting-year costs. (v) Post-completion-year costs. (6) 10... improvements. (iv) Mixed use costs. (3) $10,000,000 gross receipts test. (i) In general. (ii) Single employer...) Computations. (3) Post-completion-year income. (4) Total contract price. (i) In general. (A) Definition. (B...

  8. Modeling commodity salam contract between two parties for discrete and continuous time series

    NASA Astrophysics Data System (ADS)

    Hisham, Azie Farhani Badrol; Jaffar, Maheran Mohd

    2017-08-01

    In order for Islamic finance to remain competitive as the conventional, there needs a new development of Islamic compliance product such as Islamic derivative that can be used to manage the risk. However, under syariah principles and regulations, all financial instruments must not be conflicting with five syariah elements which are riba (interest paid), rishwah (corruption), gharar (uncertainty or unnecessary risk), maysir (speculation or gambling) and jahl (taking advantage of the counterparty's ignorance). This study has proposed a traditional Islamic contract namely salam that can be built as an Islamic derivative product. Although a lot of studies has been done on discussing and proposing the implementation of salam contract as the Islamic product however they are more into qualitative and law issues. Since there is lack of quantitative study of salam contract being developed, this study introduces mathematical models that can value the appropriate salam price for a commodity salam contract between two parties. In modeling the commodity salam contract, this study has modified the existing conventional derivative model and come out with some adjustments to comply with syariah rules and regulations. The cost of carry model has been chosen as the foundation to develop the commodity salam model between two parties for discrete and continuous time series. However, the conventional time value of money results from the concept of interest that is prohibited in Islam. Therefore, this study has adopted the idea of Islamic time value of money which is known as the positive time preference, in modeling the commodity salam contract between two parties for discrete and continuous time series.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed,more » several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.« less

  10. 48 CFR 916.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., output, be it hardware, research and development, demonstration or services, together with business... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405-2 Cost-plus-award-fee... appropriate) and business management considerations tailored to the needs of the particular situation. In...

  11. 48 CFR 415.404-4 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Termination settlements; and (v) Cost-plus-award-fee contracts; (b) Unless otherwise restricted by contracting... CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 415.404-4 Profit. (a)(1) USDA will use a... negotiation is based on cost analysis. (2) The following types of acquisitions are exempt from the...

  12. Cost analysis helps evaluate contract profitability.

    PubMed

    Sides, R W

    2000-02-01

    A cost-accounting analysis can help group practices assess their costs of doing business and determine the profitability of managed care contracts. Group practices also can use cost accounting to develop budgets and financial benchmarks. To begin a cost analysis, group practices need to determine their revenue and cost centers. Then they can allocate their costs to each center, using an appropriate allocation basis. The next step is to calculate costs per procedure. The results can be used to evaluate operational cost efficiency as well as help negotiate managed care contracts.

  13. 48 CFR 47.306-1 - Transportation cost determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation cost... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-1 Transportation cost determinations. When requesting the transportation officer to assist in evaluating offers, the contracting...

  14. 48 CFR 47.306-1 - Transportation cost determinations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Transportation cost... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-1 Transportation cost determinations. When requesting the transportation officer to assist in evaluating offers, the contracting...

  15. 48 CFR 47.306-1 - Transportation cost determinations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Transportation cost... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-1 Transportation cost determinations. When requesting the transportation officer to assist in evaluating offers, the contracting...

  16. 48 CFR 47.306-1 - Transportation cost determinations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Transportation cost... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-1 Transportation cost determinations. When requesting the transportation officer to assist in evaluating offers, the contracting...

  17. 48 CFR 47.306-1 - Transportation cost determinations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Transportation cost... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-1 Transportation cost determinations. When requesting the transportation officer to assist in evaluating offers, the contracting...

  18. Contracting for health services in New Zealand: a transaction cost analysis.

    PubMed

    Ashton, T

    1998-02-01

    The splitting of the functions of purchaser and provider in the New Zealand health system in 1993 necessitated the use of explicit contracts between the two parties. This paper examines contracting experiences during the first two years of operation. The study focuses on four services: rest homes, primary care clinics, surgical services, and acute mental health services. The insights of transaction cost economics form the theoretical framework. The objective of this study was to examine whether the transaction costs associated with contracting vary across the four different services, and whether different types of contracts and contractual relationships are emerging as transactors attempt to reduce these costs. Information was collected in a series of 53 interviews with purchasers and providers, together with any relevant documentation. The results suggest that the costs of contracting are indeed greater for some services than for others. Other variables such as the style of negotiations, the type and specificity of contracts and the degree of monitoring also differ across the four services. At this early stage of the reform process, there was little evidence that purchasers and providers were attempting to reduce transaction costs by negotiating more flexible, longer-term, relational contracts. The main benefit from contracting to date has been improved accountability of service providers.

  19. Educating Medical Laboratory Technologists: Revisiting Our Assumptions in the Current Economic and Health-Care Environment

    PubMed Central

    Linder, Regina

    2012-01-01

    Health care occupies a distinct niche in an economy struggling to recover from recession. Professions related to the care of patients are thought to be relatively resistant to downturns, and thus become attractive to students typically drawn to more lucrative pursuits. Currently, a higher profile for clinical laboratory technology among college students and those considering career change results in larger and better prepared applicant pools. However, after decades of contraction marked by closing of programs, prospective students encounter an educational system without the capacity or vigor to meet their needs. Here discussed are some principles and proposals to allow universities, partnering with health-care providers, government agencies, and other stake-holders to develop new programs, or reenergize existing ones to serve our students and patients. Principles include academic rigor in biomedical and clinical science, multiple points of entry for students, flexibility in format, cost effectiveness, career ladders and robust partnerships. PMID:23653802

  20. 48 CFR 49.206 - Settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement proposals. 49.206 Section 49.206 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for...

  1. 48 CFR 49.204 - Deductions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Deductions. 49.204 Section 49.204 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.204...

  2. 48 CFR 15.407-1 - Defective certified cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or pricing data. 15.407-1 Section 15.407-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.407-1 Defective certified cost or pricing data. (a) If, before agreement on price, the contracting officer learns...

  3. 48 CFR 742.770 - Negotiated indirect cost rate agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... rate agreement. 742.770 Section 742.770 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 742.770 Negotiated indirect cost... Agreement is automatically incorporated in each contract between the parties and shall specify: (a) The...

  4. 48 CFR 742.770 - Negotiated indirect cost rate agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... rate agreement. 742.770 Section 742.770 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 742.770 Negotiated indirect cost... Agreement is automatically incorporated in each contract between the parties and shall specify: (a) The...

  5. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2009-02-01

    cost of capital ( WACC ). WACC is the cost of debt plus the cost of equity both weighted by the market values debt and equity, respectively. The cost...Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice (FAR 16.1) Margin – (p = f(NBV, n, α, risk)) Payments (α) FCOM ( = f(NBV, Treasury...projections, layers on the profit and contract financing policy, estimates the levered WACC as the discount rate, and finally calculates the NPV of the

  6. Comparing the costs of agency and contract fire crews.

    Treesearch

    G.H. Donovan

    2007-01-01

    This paper compares the cost of using Forest Service fire crews versus contract fire crews. Results suggest that if sufficient work is available to keep a Forest Service crew productively employed throughout a fire season, then the daily cost of a Forest Service type II crew is lower than the daily cost of a contract crew.

  7. 48 CFR 215.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or pricing data. 215.403 Section 215.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403 Obtaining certified cost or pricing data. ...

  8. 48 CFR 215.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or pricing data. 215.403 Section 215.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403 Obtaining certified cost or pricing data. ...

  9. 48 CFR 215.403 - Obtaining certified cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or pricing data. 215.403 Section 215.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403 Obtaining certified cost or pricing data. ...

  10. A transaction costs analysis of changing contractual relations in the English NHS.

    PubMed

    Marini, Giorgia; Street, Andrew

    2007-09-01

    The English National Health Service has replaced locally negotiated block contracting arrangements with a system of national prices to pay for hospital activity. This paper applies a transaction costs approach to quantify and analyse the nature of how contracting costs have changed as a consequence. Data collection was based on semi-structured interviews with key stakeholders from hospitals and Primary Care Trusts, which purchase hospital services. Replacing block contracting with activity based funding has led to lower costs of price negotiation, but these are outweighed by higher costs associated with volume control, of data collection, contract monitoring, and contract enforcement. There was consensus that the new contractual arrangements were preferable, but the benefits will have to be demonstrated formally in future.

  11. 10 CFR 1023.3 - Principles of general applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Principles of general applicability. 1023.3 Section 1023.3 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) CONTRACT APPEALS Overview: Organization, Functions and Authorities § 1023.3 Principles of general applicability. (a) Adjudicatory functions. The following principles...

  12. United States Navy Contracting Officer Warranting Process

    DTIC Science & Technology

    2011-03-01

    by 30% or more of the respondents: Contract Law , Cost Analysis, Market Research, Contract Source Selection, Simplified Acquisition Procedures, and...that the majority of AOs found the following course at least somewhat important: Contract Law , Cost Analysis, Market Research, Contract 52 Source...the budget and appropriation cycle 4. Ethics and conduct standards 5. Basic contract laws and regulations 6. Socio-economic requirements in

  13. Paradigm of Legal Protection of Computer Software Contracts in the United States: Brief Overview of “Principles of the Law of Software Contracts”

    NASA Astrophysics Data System (ADS)

    Furuya, Haruhisa; Hiratsuka, Mitsuyoshi

    This article overviews the historical transition of legal protection of Computer software contracts in the Unite States and presents how it should function under Uniform Commercial Code and its amended Article 2B, Uniform Computer Information Transactions Act, and also recently-approved “Principles of the Law of Software Contracts”.

  14. 48 CFR 1542.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 1542.705 Section 1542.705 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 1542.705 Final indirect cost rates. (a) The... contracts when the Environmental Protection Agency (EPA) is the cognizant federal agency and a FACO will be...

  15. 48 CFR 47.306-2 - Lowest overall transportation costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transportation costs. 47.306-2 Section 47.306-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-2 Lowest overall transportation costs. (a) For the evaluation of offers, the transportation officer shall give to the contracting...

  16. 48 CFR 47.306-2 - Lowest overall transportation costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... transportation costs. 47.306-2 Section 47.306-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-2 Lowest overall transportation costs. (a) For the evaluation of offers, the transportation officer shall give to the contracting...

  17. 48 CFR 47.306-2 - Lowest overall transportation costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... transportation costs. 47.306-2 Section 47.306-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-2 Lowest overall transportation costs. (a) For the evaluation of offers, the transportation officer shall give to the contracting...

  18. 48 CFR 47.306-2 - Lowest overall transportation costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... transportation costs. 47.306-2 Section 47.306-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-2 Lowest overall transportation costs. (a) For the evaluation of offers, the transportation officer shall give to the contracting...

  19. 48 CFR 47.306-2 - Lowest overall transportation costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... transportation costs. 47.306-2 Section 47.306-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.306-2 Lowest overall transportation costs. (a) For the evaluation of offers, the transportation officer shall give to the contracting...

  20. 48 CFR 1816.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-reimbursement incentive contracts. 1816.405 Section 1816.405 Federal Acquisition Regulations System NATIONAL AERONAUTICS... 1816.405 Cost-reimbursement incentive contracts. [62 FR 3478, Jan. 23, 1997. Redesignated at 62 FR...

  1. 48 CFR 849.111-71 - Submission of information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.111-71 Submission of information. (a) The contracting officer shall submit to the appropriate Acquisition Program Management Division or... submission of additional information. (b) The Director, Acquisition Program Management Division, or the...

  2. 48 CFR 49.203 - Adjustment for loss.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Adjustment for loss. 49.203 Section 49.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for...

  3. 48 CFR 49.205 - Completed end items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completed end items. 49.205 Section 49.205 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for...

  4. 48 CFR 49.207 - Limitation on settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Limitation on settlements. 49.207 Section 49.207 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for...

  5. 48 CFR 528.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 528.311 Section 528.311 Federal...-reimbursement contracts. ...

  6. 48 CFR 28.311 - Solicitation provision and contract clause on liability insurance under cost-reimbursement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Solicitation provision and contract clause on liability insurance under cost-reimbursement contracts. 28.311 Section 28.311 Federal...-reimbursement contracts. ...

  7. A summary of the ECAS performance and cost results for MHD system. [Energy Conversion Alternatives Study

    NASA Technical Reports Server (NTRS)

    Seikel, G. R.; Sovie, R. J.; Burns, R. K.; Barna, G. J.; Burkhart, J. A.; Nainiger, J. J.; Smith, J. M.

    1976-01-01

    The interagency-funded, NASA-coordinated Energy Conversion Alternatives Study (ECAS) has studied the potential of various advanced power plant concepts using coal and coal-derived fuel. Principle studies were conducted through prime contracts with the General Electric Company and the Westinghouse Electric Corporation. The results indicate that open-cycle coal-fired direct-preheat MHD systems have potentially one of the highest coal-pile-to-bus-bar efficiencies and also one of the lowest costs of electricity (COE) of the systems studied. Closed-cycle MHD systems may have the potential to approach the efficiency and COE of open-cycle MHD. The 1200-1500 F liquid-metal MHD systems studied do not appear to have the potential of exceeding the efficiency or competing with the COE of advanced steam plants.

  8. 48 CFR 48.104-4 - Sharing alternative-no-cost settlement method.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract, the contracting officer shall analyze the different approaches available to determine which one... the contracting officer's judgment, reliance on other VECP approaches likely would not be more cost-effective, and the no-cost settlement would provide adequate consideration to the Government. Under this...

  9. 48 CFR 48.104-4 - Sharing alternative-no-cost settlement method.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract, the contracting officer shall analyze the different approaches available to determine which one... the contracting officer's judgment, reliance on other VECP approaches likely would not be more cost-effective, and the no-cost settlement would provide adequate consideration to the Government. Under this...

  10. 14 CFR 1274.919 - Cost principles and accounting standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost principles and accounting standards... principles and accounting standards. Cost Principles and Accounting Standards July 2002 The expenditure of... Recipient (See clause entitled “Resource Sharing Requirements”) shall be governed by the FAR cost principles...

  11. An Analysis of Costs and Cenefits Associated with Initial Contracting Technical Education and Training for Unrestricted Marine Officers

    DTIC Science & Technology

    2017-03-01

    COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS by Lee A. White...WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS 5. FUNDING NUMBERS 6. AUTHOR(S) Lee A. White 7. PERFORMING...unlimited. AN ANALYSIS OF COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS

  12. 48 CFR 49.208 - Equitable adjustment after partial termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Equitable adjustment after partial termination. 49.208 Section 49.208 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts...

  13. 48 CFR 332.704 - Limitation of cost or funds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Limitation of cost or funds. 332.704 Section 332.704 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 332.704 Limitation of cost or funds. See subpart...

  14. 48 CFR 47.104-3 - Cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... CONTRACT MANAGEMENT TRANSPORTATION General 47.104-3 Cost-reimbursement contracts. (a) 49 U.S.C. 10721 and... accrues to the Government, i.e., the Government shall pay the charges or directly and completely reimburse...

  15. 2001 contract management survey.

    PubMed

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  16. 24 CFR 908.108 - Cost.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... computer hardware or software, or both, the cost of contracting for those services, or the cost of... operating budget. At the HA's option, the cost of the computer software may include service contracts to...

  17. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  18. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  19. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  20. On Anaphora and the Binding Principles in Categorial Grammar

    NASA Astrophysics Data System (ADS)

    Morrill, Glyn; Valentín, Oriol

    In type logical categorial grammar the analysis of an expression is a resource-conscious proof. Anaphora represents a particular challenge to this approach in that the antecedent resource is multiplied in the semantics. This duplication, which corresponds logically to the structural rule of contraction, may be treated lexically or syntactically. Furthermore, anaphora is subject to constraints, which Chomsky (1981) formulated as Binding Principles A, B, and C. In this paper we consider English anaphora in categorial grammar including reference to the binding principles. We invoke displacement calculus, modal categorial calculus, categorial calculus with limited contraction, and entertain addition of negation as failure.

  1. 41 CFR 101-5.303 - Guiding principles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Guiding principles. 101-5... COMPLEXES 5.3-Federal Employee Health Services § 101-5.303 Guiding principles. The following principles will..., the compensation of the employees of the health unit, and other factors of medical economics prevalent...

  2. 29 CFR 785.4 - Application to Walsh-Healey Public Contracts Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Application to Walsh-Healey Public Contracts Act. 785.4... Considerations § 785.4 Application to Walsh-Healey Public Contracts Act. The principles set forth in this part... employees performing work subject to the provisions of the Walsh-Healey Public Contracts Act. [35 FR 15289...

  3. 41 CFR 302-12.109 - What must we consider in deciding whether to use the fixed-fee or cost-reimbursable contracting...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... deciding whether to use the fixed-fee or cost-reimbursable contracting method? 302-12.109 Section 302-12... Services Company § 302-12.109 What must we consider in deciding whether to use the fixed-fee or cost...-fee or cost-reimbursable contracting method: (a) Risk of alternative methods. Under a fixed fee...

  4. 48 CFR 49.206-3 - Submission of inventory disposal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of inventory disposal schedules. 49.206-3 Section 49.206-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts...

  5. 48 CFR 49.206-2 - Bases for settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Bases for settlement proposals. 49.206-2 Section 49.206-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for...

  6. 48 CFR 416.405 - Cost-reimbursement incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 416.405 Section 416.405 Federal Acquisition Regulations System DEPARTMENT OF...-reimbursement incentive contracts. ...

  7. 34 CFR 76.530 - General cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false General cost principles. 76.530 Section 76.530... Be Met by the State and Its Subgrantees? Allowable Costs § 76.530 General cost principles. Both 34 CFR 74.27 and 34 CFR 80.22 reference the general cost principles that apply to grants, subgrants and...

  8. 48 CFR 1816.405-2 - Cost-plus-award-fee (CPAF) contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-plus-award-fee (CPAF) contracts. 1816.405-2 Section 1816.405-2 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....405-2 Cost-plus-award-fee (CPAF) contracts. [62 FR 3478, Jan. 23, 1997. Redesignated at 62 FR 36706...

  9. HMO Risk Contracts--A "No Cost" Way to Manage Retiree Health Care Costs?

    ERIC Educational Resources Information Center

    Hammer, Barbara F.

    1995-01-01

    Health Maintenance Organization (HMO) "risk contracts," under which HMOs cover Medicare-eligible individuals, are explained; and the costs, benefits, and coverage are compared with those of other managed care options. Employers with retiree medical plans are encouraged to consider using HMO risk contracts for both short- and long-term…

  10. 48 CFR 53.301-1437 - Settlement Proposal for Cost-Reimbursement Type Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Settlement Proposal for Cost-Reimbursement Type Contracts. 53.301-1437 Section 53.301-1437 Federal Acquisition Regulations...-1437 Settlement Proposal for Cost-Reimbursement Type Contracts. ER09DE97.012 [62 FR 64951, Dec. 9, 1997] ...

  11. An optimization modeling approach to awarding large fire support wildfire helicopter contracts from the US Forest Service

    Treesearch

    Stephanie A. Snyder; Keith D. Stockmann; Gaylord E. Morris

    2012-01-01

    The US Forest Service used contracted helicopter services as part of its wildfire suppression strategy. An optimization decision-modeling system was developed to assist in the contract selection process. Three contract award selection criteria were considered: cost per pound of delivered water, total contract cost, and quality ratings of the aircraft and vendors....

  12. 48 CFR 217.170 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract to the cost of an annual procurement approach, using a present value analysis. Do not award the multiyear contract unless the analysis shows that the multiyear contract will result in the lower cost (10 U...

  13. 42 CFR 438.812 - Costs under risk and nonrisk contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS MANAGED CARE Conditions for Federal Financial Participation § 438.812 Costs under risk and nonrisk contracts. (a) Under a risk contract, the total amount the...

  14. 48 CFR 1028.307 - Insurance under cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Insurance under cost-reimbursement contracts. 1028.307 Section 1028.307 Federal Acquisition Regulations System DEPARTMENT OF THE...-reimbursement contracts. ...

  15. 48 CFR 428.307 - Insurance under cost-reimbursement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Insurance under cost-reimbursement contracts. 428.307 Section 428.307 Federal Acquisition Regulations System DEPARTMENT OF...-reimbursement contracts. ...

  16. 48 CFR 15.407-3 - Forward pricing rate agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.407-3 Forward pricing rate agreements. (a) When certified cost or pricing data are required, offerors are required to... apply and to identify the latest cost or pricing data already submitted in accordance with the FPRA. All...

  17. 48 CFR 1815.403-170 - Waivers of cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... data. 1815.403-170 Section 1815.403-170 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403-170 Waivers of cost or pricing data. (a) NASA has waived the requirement for the submission of...

  18. 48 CFR 1815.403-170 - Waivers of cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... data. 1815.403-170 Section 1815.403-170 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403-170 Waivers of cost or pricing data. (a) NASA has waived the requirement for the submission of...

  19. 48 CFR 1815.403-170 - Waivers of cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... data. 1815.403-170 Section 1815.403-170 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403-170 Waivers of cost or pricing data. (a) NASA has waived the requirement for the submission of...

  20. 48 CFR 15.407-3 - Forward pricing rate agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.407-3 Forward pricing rate agreements. (a) When certified cost or pricing data are required, offerors are required to... apply and to identify the latest cost or pricing data already submitted in accordance with the FPRA. All...

  1. 48 CFR 1516.303-75 - Amount of cost-sharing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 1516.303-75 Section 1516.303-75 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1516.303-75 Amount of... market share position; (3) The time and risk necessary to achieve success; (4) If the results of the...

  2. 48 CFR 49.603-4 - Cost-reimbursement contracts-complete termination, with settlement limited to fee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Cost-reimbursement... Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS... conditions of the contract and parts 31 and 49 of the Federal Acquisition Regulation. [Insert subparagraph (3...

  3. 48 CFR 49.603-4 - Cost-reimbursement contracts-complete termination, with settlement limited to fee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Cost-reimbursement... Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS... conditions of the contract and parts 31 and 49 of the Federal Acquisition Regulation. [Insert subparagraph (3...

  4. 48 CFR 49.603-4 - Cost-reimbursement contracts-complete termination, with settlement limited to fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Cost-reimbursement... Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS... conditions of the contract and parts 31 and 49 of the Federal Acquisition Regulation. [Insert subparagraph (3...

  5. 48 CFR 32.102 - Description of contract financing methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Description of contract financing methods. (a) Advance payments are advances of money by the Government to a... payments based on costs are made on the basis of costs incurred by the contractor as work progresses under..., contract financing. When appropriate, contract statements of work and pricing arrangements must permit...

  6. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  7. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  8. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  9. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  10. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  11. 7 CFR 632.31 - Cost-share payment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... out the contract, the land user is indebted to the United States for the cost of the misused material... contract. The cost-share payment is to be determined by one of the following methods: (1) Average cost. (2) Actual cost but not more than the average cost. (3) Specified maximum cost. If the average cost or the...

  12. 7 CFR 632.31 - Cost-share payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... out the contract, the land user is indebted to the United States for the cost of the misused material... contract. The cost-share payment is to be determined by one of the following methods: (1) Average cost. (2) Actual cost but not more than the average cost. (3) Specified maximum cost. If the average cost or the...

  13. 7 CFR 632.31 - Cost-share payment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... out the contract, the land user is indebted to the United States for the cost of the misused material... contract. The cost-share payment is to be determined by one of the following methods: (1) Average cost. (2) Actual cost but not more than the average cost. (3) Specified maximum cost. If the average cost or the...

  14. 7 CFR 632.31 - Cost-share payment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... out the contract, the land user is indebted to the United States for the cost of the misused material... contract. The cost-share payment is to be determined by one of the following methods: (1) Average cost. (2) Actual cost but not more than the average cost. (3) Specified maximum cost. If the average cost or the...

  15. 7 CFR 632.31 - Cost-share payment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... out the contract, the land user is indebted to the United States for the cost of the misused material... contract. The cost-share payment is to be determined by one of the following methods: (1) Average cost. (2) Actual cost but not more than the average cost. (3) Specified maximum cost. If the average cost or the...

  16. 76 FR 81295 - Cost Accounting Standards: Cost Accounting Standards 412 and 413-Cost Accounting Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... accounting standards governing measurement, assignment, and allocation of costs to contracts with the United... contracting parties; Measurement of pension costs must be objectively verifiable; Accounting rules must keep... cost accounting that preclude their use for the appropriate measurement, assignment and allocation of...

  17. 48 CFR 49.112-1 - Partial payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Partial payments. 49.112-1 Section 49.112-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.112-1 Partial payments. (a) General. If the contract authorizes...

  18. 48 CFR 849.106 - Fraud or other criminal conduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.106 Fraud or other criminal conduct. (a... following: (i) The DSPE. (ii) The Director, Office of Construction and Facilities Management, in the case of contracting officers from the Office of Construction and Facilities Management. (3) Follow procedures as...

  19. 43 CFR 12.62 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... uniform cost accounting standards that comply with cost principles acceptable to the Federal agency. ... COST PRINCIPLES FOR ASSISTANCE PROGRAMS Uniform Administrative Requirements for Grants and Cooperative... increment above allowable costs) to the grantee or subgrantee. (b) Applicable cost principles. For each kind...

  20. 48 CFR 252.231-7000 - Supplemental cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... principles. 252.231-7000 Section 252.231-7000 Federal Acquisition Regulations System DEFENSE ACQUISITION... of Provisions And Clauses 252.231-7000 Supplemental cost principles. As prescribed in 231.100-70, use the following clause: Supplemental Cost Principles (DEC 1991) When the allowability of costs under...

  1. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract is $___. The target fee of this contract is $___. The total target cost and target fee as contemplated by the...

  2. 41 CFR 102-3.95 - What principles apply to the management of advisory committees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What principles apply to...-FEDERAL ADVISORY COMMITTEE MANAGEMENT How Are Advisory Committees Managed? § 102-3.95 What principles... principles to the management of their advisory committees: (a) Provide adequate support. Before establishing...

  3. An analysis of cost overruns on defense acquisition contracts

    NASA Technical Reports Server (NTRS)

    Christensen, David S.

    1994-01-01

    This article examines the history of cost overruns reported on 64 completed defense contracts. Its purpose is to formally test the observation of the Under Secretary. Results confirm the observation at the 95 percent level of confidence, and were generally insensitive to the contract type (price, cost), the contract phase (development, production), the type of weapon system (air, ground, sea), and the armed forces service (Air Force, Army, Navy) that managed the contract. After a review of terminology, concepts, and related research for those unfamiliar with the area, the methodology, results, and managerial implications are described.

  4. 48 CFR 1649.101-71 - FEHBP termination for convenience clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1649.101-71 FEHBP termination for convenience clause. The clause set forth in...

  5. Fluid-driven origami-inspired artificial muscles.

    PubMed

    Li, Shuguang; Vogt, Daniel M; Rus, Daniela; Wood, Robert J

    2017-12-12

    Artificial muscles hold promise for safe and powerful actuation for myriad common machines and robots. However, the design, fabrication, and implementation of artificial muscles are often limited by their material costs, operating principle, scalability, and single-degree-of-freedom contractile actuation motions. Here we propose an architecture for fluid-driven origami-inspired artificial muscles. This concept requires only a compressible skeleton, a flexible skin, and a fluid medium. A mechanical model is developed to explain the interaction of the three components. A fabrication method is introduced to rapidly manufacture low-cost artificial muscles using various materials and at multiple scales. The artificial muscles can be programed to achieve multiaxial motions including contraction, bending, and torsion. These motions can be aggregated into systems with multiple degrees of freedom, which are able to produce controllable motions at different rates. Our artificial muscles can be driven by fluids at negative pressures (relative to ambient). This feature makes actuation safer than most other fluidic artificial muscles that operate with positive pressures. Experiments reveal that these muscles can contract over 90% of their initial lengths, generate stresses of ∼600 kPa, and produce peak power densities over 2 kW/kg-all equal to, or in excess of, natural muscle. This architecture for artificial muscles opens the door to rapid design and low-cost fabrication of actuation systems for numerous applications at multiple scales, ranging from miniature medical devices to wearable robotic exoskeletons to large deployable structures for space exploration. Copyright © 2017 the Author(s). Published by PNAS.

  6. Fluid-driven origami-inspired artificial muscles

    PubMed Central

    Li, Shuguang; Vogt, Daniel M.; Rus, Daniela; Wood, Robert J.

    2017-01-01

    Artificial muscles hold promise for safe and powerful actuation for myriad common machines and robots. However, the design, fabrication, and implementation of artificial muscles are often limited by their material costs, operating principle, scalability, and single-degree-of-freedom contractile actuation motions. Here we propose an architecture for fluid-driven origami-inspired artificial muscles. This concept requires only a compressible skeleton, a flexible skin, and a fluid medium. A mechanical model is developed to explain the interaction of the three components. A fabrication method is introduced to rapidly manufacture low-cost artificial muscles using various materials and at multiple scales. The artificial muscles can be programed to achieve multiaxial motions including contraction, bending, and torsion. These motions can be aggregated into systems with multiple degrees of freedom, which are able to produce controllable motions at different rates. Our artificial muscles can be driven by fluids at negative pressures (relative to ambient). This feature makes actuation safer than most other fluidic artificial muscles that operate with positive pressures. Experiments reveal that these muscles can contract over 90% of their initial lengths, generate stresses of ∼600 kPa, and produce peak power densities over 2 kW/kg—all equal to, or in excess of, natural muscle. This architecture for artificial muscles opens the door to rapid design and low-cost fabrication of actuation systems for numerous applications at multiple scales, ranging from miniature medical devices to wearable robotic exoskeletons to large deployable structures for space exploration. PMID:29180416

  7. Fluid-driven origami-inspired artificial muscles

    NASA Astrophysics Data System (ADS)

    Li, Shuguang; Vogt, Daniel M.; Rus, Daniela; Wood, Robert J.

    2017-12-01

    Artificial muscles hold promise for safe and powerful actuation for myriad common machines and robots. However, the design, fabrication, and implementation of artificial muscles are often limited by their material costs, operating principle, scalability, and single-degree-of-freedom contractile actuation motions. Here we propose an architecture for fluid-driven origami-inspired artificial muscles. This concept requires only a compressible skeleton, a flexible skin, and a fluid medium. A mechanical model is developed to explain the interaction of the three components. A fabrication method is introduced to rapidly manufacture low-cost artificial muscles using various materials and at multiple scales. The artificial muscles can be programed to achieve multiaxial motions including contraction, bending, and torsion. These motions can be aggregated into systems with multiple degrees of freedom, which are able to produce controllable motions at different rates. Our artificial muscles can be driven by fluids at negative pressures (relative to ambient). This feature makes actuation safer than most other fluidic artificial muscles that operate with positive pressures. Experiments reveal that these muscles can contract over 90% of their initial lengths, generate stresses of ˜600 kPa, and produce peak power densities over 2 kW/kg—all equal to, or in excess of, natural muscle. This architecture for artificial muscles opens the door to rapid design and low-cost fabrication of actuation systems for numerous applications at multiple scales, ranging from miniature medical devices to wearable robotic exoskeletons to large deployable structures for space exploration.

  8. 12 CFR 1207.21 - Equal opportunity in employment and contracting.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the principles of equal opportunity and non-discrimination in employment and in contracting; (2... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Equal opportunity in employment and contracting... MINORITY AND WOMEN INCLUSION (Eff. Jan. 27, 2011) Minority and Women Inclusion and Diversity at Regulated...

  9. Annual Growth of Contract Costs for Major Programs in Development and Early Production

    DTIC Science & Technology

    2016-03-21

    changes, we can identify some underlying drivers and rule out others. Development and Early Production Differences BBP-era drops are driven by dropping...Annual Growth of Contract Costs for Major Programs in Development and Early Production Dan Davis and Philip S...Growth of Contract Costs for Major Programs in Development and Early Production Dan Davis and Philip S. Antón March 21, 2016 SUMMARY Cost is

  10. 48 CFR 15.403-3 - Requiring data other than certified cost or pricing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Requiring data other than certified cost or pricing data. 15.403-3 Section 15.403-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15...

  11. 48 CFR 15.403-3 - Requiring data other than certified cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Requiring data other than certified cost or pricing data. 15.403-3 Section 15.403-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15...

  12. 48 CFR 15.403-3 - Requiring data other than certified cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Requiring data other than certified cost or pricing data. 15.403-3 Section 15.403-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15...

  13. 48 CFR 15.403-3 - Requiring data other than certified cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requiring data other than certified cost or pricing data. 15.403-3 Section 15.403-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15...

  14. 48 CFR 15.403-3 - Requiring data other than certified cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requiring data other than certified cost or pricing data. 15.403-3 Section 15.403-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15...

  15. 41 CFR 60-741.4 - Coverage and waivers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facilitated, performance of the contract or a provision of the contract; or (B) The cost or a portion of the... allocable in whole or in part as a direct cost to any Government contract, and only a de minimis (less than... quantities. With respect to indefinite delivery-type contracts and subcontracts (including, but not limited...

  16. 34 CFR 75.530 - General cost principles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false General cost principles. 75.530 Section 75.530 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Conditions Must Be Met by a Grantee? Allowable Costs § 75.530 General cost principles. The general principles to be used in...

  17. 42 CFR 417.536 - Cost payment principles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Cost payment principles. 417.536 Section 417.536... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.536 Cost payment principles. (a) Applicability. Unless otherwise specified in this subpart, the principles set forth in parts 412 and 413 of this chapter are...

  18. 76 FR 49841 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    .... Each cost allocation method must satisfy six cost allocation principles. DATES: Effective Date: This... 86 c. Commission Determination 99 3. Regional Transmission Planning Principles........ 118 a.... Principles for Regional and Interregional Cost 585 Allocation 1. Use of a Principles-Based Approach 585 a...

  19. 48 CFR 1649.101-72 - FEHBP termination for default clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1649.101-72 FEHBP termination for default clause. The clause set forth in 1652...

  20. 40 CFR 35.938-3 - Type of contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.938-3 Type of... other acceptable type of contract. The cost-plus-percentage-of-cost contract shall not be used in any...

  1. Should health authorities offer risk-sharing contracts to pharmaceutical firms? A theoretical approach.

    PubMed

    Antonanzas, Fernando; Juarez-Castello, Carmelo; Rodriguez-Ibeas, Roberto

    2011-07-01

    In this paper, we characterise the risk-sharing contracts that health authorities can design when they face a regulatory decision on drug pricing and reimbursement in a context of uncertainty. We focus on two types of contracts. On the one hand, the health authority can reimburse the firm for each treated patient regardless of health outcomes (non risk-sharing). Alternatively, the health authority can pay for the drug only when the patient is cured (risk-sharing contract). The optimal contract depends on the trade-off between the monitoring costs, the marginal production cost and the utility derived from treatment. A non-risk-sharing agreement will be preferred by the health authority, if patients who should not be treated impose a relatively low cost to the health system. When this cost is high, the health authority would prefer a risk-sharing agreement for relatively low monitoring costs.

  2. 48 CFR 49.108-3 - Settlement procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-3 Settlement procedure. (a) Contractors shall settle with subcontractors in general conformity with the policies and principles relating to settlement...

  3. Health promotion in supplementary health care: outsourcing, microregulation and implications for care.

    PubMed

    Silva, Kênia Lara; Sena, Roseni Rosângela; Rodrigues, Andreza Trevenzoli; Araújo, Fernanda Lopes; Belga, Stephanie Marques Moura Franco; Duarte, Elysângela Dittz

    2015-01-01

    to analyze health promotion programs in the supplementary health care. This was a multiple case study with a qualitative approach whose data were obtained from interviews with coordinators of providers contracted by the corporations of health insurance plans in Belo Horizonte, Minas Gerais. The data were submitted to Critical Discourse Analysis. Home care has been described as the main action in the field of health promotion transferred to the providers, followed by management of patients and cases, and the health education.groups. The existence of health promotion principles is questionable in all programs. Outsourcing is marked by a process with a division between cost and care management. Implications of this process occur within admission and interventions on the needs of the beneficiaries. Statements revealed rationalization of cost, restructuring of work, and reproduction of the dominant logic of capital accumulation by the health insurance companies.

  4. 45 CFR 2541.220 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... accounting standards that comply with cost principles acceptable to the Federal agency. ... the grantee or subgrantee. (b) Applicable cost principles. For each kind of organization, there is a set of Federal principles for determining allowable costs. Allowable costs will be determined in...

  5. 48 CFR 1649.101-70 - FEHBP renewal and withdrawal of approval clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1649.101-70 FEHBP renewal and withdrawal of approval clause. The...

  6. 48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...

  7. 77 FR 69422 - Cost Accounting Standards: Revision of the Exemption From Cost Accounting Standards for Contracts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... Accounting Standards: Revision of the Exemption From Cost Accounting Standards for Contracts and Subcontracts... Federal Procurement Policy (OFPP), Cost Accounting Standards (CAS) Board. ACTION: Proposed rule. SUMMARY... J. M. Wong, Director, Cost Accounting Standards Board (telephone: 202-395-6805; email: Raymond_wong...

  8. Signed, Sealed and Delivered.

    ERIC Educational Resources Information Center

    Jackson, Lisa M.

    1997-01-01

    Describes one Massachusetts school district's solution to rising energy costs by using contract services to head off capital costs and guarantee savings. Highlights keys to successful management of this contracting system and the elements that make up a successful contract services candidate. (GR)

  9. 10 CFR 600.317 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Allowable costs. (a) DOE determines allowability of costs in accordance with the cost principles applicable... OMB Circular A-122 is determined in accordance with the for-profit costs principles in 48 CFR part 31... accordance with OMB Circular A-21, “Cost Principles for Educational Institutions.” (ii) Other nonprofit...

  10. 77 FR 64890 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... each cost allocation method must satisfy six cost allocation principles. DATES: Effective November 23... Interregional Transmission 61 Coordination Requirements III. Cost Allocation 65 1. Cost Allocation Principle 2... must satisfy six cost allocation principles. 3. In Order No. 1000-A, the Commission largely affirmed...

  11. Radiology equipment maintenance and contract procurement in the UK.

    PubMed

    Wright, Christopher J

    2012-01-01

    Radiology equipment maintenance has a similar financial value to new device acquisition over the lifetime of the device. Comprehensive style contracts are dominant largely due to their ease of use and the potential to control budgetary costs, but costs are high. Creative procurement solutions can offer better value. The corrective portion of comprehensive contracts is estimated to be between 50% (Mobile C-Arm) to 92% (CT), which equates to $29.4 million; 80% of the total contract costs within the research population of this study. Many organizations could free up cash by better managing their maintenance costs, potentially creating funding opportunities for new equipment.

  12. The Post-Award Costs of Contracting Out: The U.S. Navy’s Implementation of OMB Circular A-76

    DTIC Science & Technology

    1988-06-01

    Commercial Activities (CA) Program Update, 6 April 1987. 4. Horngren , C.T. and Foster, G., Cost Accounting : A Managerial Emphasis, 6th Ed., Prentice-Hall... COSTS OF CONTRACTING OUT: THE U.S. NAVY’S IMPLEMENTATION OF OMB CIRCULAR A-76 12 PERSONAL AUTHOR( S ) Cole. Nancy S . and Cnlp Charla P 13a TYPE OF...of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was

  13. Cost and Schedule Benchmarks for Defense Acquisition Contracts

    DTIC Science & Technology

    1994-09-01

    and schedule deviations early Knepp & S -curves for cost S -curves couldn’t Stroble/1993 control be used Terry & EAC Indices SCI-based EAC is...completed and on-going contracts from the early 1970’ s to date. Some of the fields in the database used in determining the status of cost overruns and...Measurement Data (Christensen, 1992:20). Christensen Article David S . Christensen published an analysis of cost overruns on DoD acquisition contracts

  14. 20 CFR 668.840 - What cost principles apply to INA funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What cost principles apply to INA funds? 668.840 Section 668.840 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR... Requirements § 668.840 What cost principles apply to INA funds? The cost principles described in OMB Circulars...

  15. 77 FR 17360 - Reform of Federal Policies Relating to Grants and Cooperative Agreements; Cost Principles And...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... II Reform of Federal Policies Relating to Grants and Cooperative Agreements; Cost Principles And...; cost principles and administrative requirements (including Single Audit Act). The original comment...-idx?c=ecfr&tpl=/ecfrbrowse/Title02/2cfrv1_02.tpl . The Cost Principles for Hospitals are in the...

  16. 41 CFR Appendix A to Subpart B of... - 3-Key Points and Principles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Principles A Appendix A to Subpart B of Part 102 Public Contracts and Property Management Federal Property.... B, App. A Appendix A to Subpart B of Part 102-3—Key Points and Principles This appendix provides... principles that may be applied to situations not covered elsewhere in this subpart. The guidance follows: Key...

  17. 41 CFR Appendix A to Subpart D of... - 3-Key Points and Principles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Principles A Appendix A to Subpart D of Part 102 Public Contracts and Property Management Federal Property... Subpart D of Part 102-3—Key Points and Principles This appendix provides additional guidance in the form of answers to frequently asked questions and identifies key points and principles that may be applied...

  18. 41 CFR Appendix A to Subpart C of... - 3-Key Points and Principles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Principles A Appendix A to Subpart C of Part 102 Public Contracts and Property Management Federal Property... 102-3—Key Points and Principles This appendix provides additional guidance in the form of answers to frequently asked questions and identifies key points and principles that may be applied to situations not...

  19. 41 CFR 102-85.25 - What is the basic principle governing OAs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... principle governing OAs? 102-85.25 Section 102-85.25 Public Contracts and Property Management Federal... POLICY FOR OCCUPANCY IN GSA SPACE Pricing Policy-General § 102-85.25 What is the basic principle governing OAs? The basic principle governing OAs is to adopt the private sector practice of capturing in a...

  20. 48 CFR 49.112 - Payment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Payment. 49.112 Section 49.112 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.112 Payment. ...

  1. 48 CFR 234.7100 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Cost and Software Data Reporting 234.7100 Policy. (a) The cost and software data reporting (CSDR) requirement is mandatory for major defense... data reporting and software resources data reporting. (b) Prior to contract award, contracting officers...

  2. 48 CFR 234.7100 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Cost and Software Data Reporting 234.7100 Policy. (a) The cost and software data reporting (CSDR) requirement is mandatory for major defense... data reporting and software resources data reporting. (b) Prior to contract award, contracting officers...

  3. 48 CFR 234.7100 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Cost and Software Data Reporting 234.7100 Policy. (a) The cost and software data reporting (CSDR) requirement is mandatory for major defense... data reporting and software resources data reporting. (b) Prior to contract award, contracting officers...

  4. 48 CFR 234.7100 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Cost and Software Data Reporting 234.7100 Policy. (a) The cost and software data reporting (CSDR) requirement is mandatory for major defense... data reporting and software resources data reporting. (b) Prior to contract award, contracting officers...

  5. Educational contracts in family medicine residency training.

    PubMed Central

    Mahood, S.; Rojas, R.; Andres, D.; Zagozeski, C.; White, G.; Bradel, T.

    1994-01-01

    An educational contract for family medicine residency training and evaluation addresses many of the difficulties and challenges of current postgraduate medical education. This article identifies important principles for developing a contractual approach; describes the contract used in one program and its implementation; and discusses its theory, advantages, and limitations. Images p550-a PMID:8199512

  6. 29 CFR 4.131 - Furnishing services involving more than use of labor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Some examples of covered contracts illustrating these principles may be helpful. One such example is a... through the use of service employees, the contract remains subject to the Act. (c) Another example of the... furnishing of such services is the principal purpose of the contracts. For example, property removal or...

  7. 29 CFR 4.131 - Furnishing services involving more than use of labor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Some examples of covered contracts illustrating these principles may be helpful. One such example is a... through the use of service employees, the contract remains subject to the Act. (c) Another example of the... furnishing of such services is the principal purpose of the contracts. For example, property removal or...

  8. First-principles Electronic Structure Calculations for Scintillation Phosphor Nuclear Detector Materials

    NASA Astrophysics Data System (ADS)

    Canning, Andrew

    2013-03-01

    Inorganic scintillation phosphors (scintillators) are extensively employed as radiation detector materials in many fields of applied and fundamental research such as medical imaging, high energy physics, astrophysics, oil exploration and nuclear materials detection for homeland security and other applications. The ideal scintillator for gamma ray detection must have exceptional performance in terms of stopping power, luminosity, proportionality, speed, and cost. Recently, trivalent lanthanide dopants such as Ce and Eu have received greater attention for fast and bright scintillators as the optical 5d to 4f transition is relatively fast. However, crystal growth and production costs remain challenging for these new materials so there is still a need for new higher performing scintillators that meet the needs of the different application areas. First principles calculations can provide a useful insight into the chemical and electronic properties of such materials and hence can aid in the search for better new scintillators. In the past there has been little first-principles work done on scintillator materials in part because it means modeling f electrons in lanthanides as well as complex excited state and scattering processes. In this talk I will give an overview of the scintillation process and show how first-principles calculations can be applied to such systems to gain a better understanding of the physics involved. I will also present work on a high-throughput first principles approach to select new scintillator materials for fabrication as well as present more detailed calculations to study trapping process etc. that can limit their brightness. This work in collaboration with experimental groups has lead to the discovery of some new bright scintillators. Work supported by the U.S. Department of Homeland Security and carried out under U.S. Department of Energy Contract no. DE-AC02-05CH11231 at Lawrence Berkeley National Laboratory.

  9. 48 CFR 9905.502-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect... of general purpose test equipment costs from the indirect cost pool to the contract, in addition to...

  10. 48 CFR 49.603-5 - Cost-reimbursement contracts-partial termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement....603-5 Cost-reimbursement contracts—partial termination. [Insert the following in Block 14 of SF 30, Amendment of Solicitation/Modification of Contract, for settlement agreements for cost-reimbursement...

  11. 48 CFR 942.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Final indirect cost rates. 942.705 Section 942.705 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 942.705 Final indirect cost rates. ...

  12. 48 CFR 3442.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Final indirect cost rates. 3442.705 Section 3442.705 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 3442.705 Final indirect cost rates...

  13. Blood transfusion safety: a new philosophy.

    PubMed

    Franklin, I M

    2012-12-01

    Blood transfusion safety has had a chequered history, and there are current and future challenges. Internationally, there is no clear consensus for many aspects of the provision of safe blood, although pan-national legislation does provide a baseline framework in the European Union. Costs are rising, and new safety measures can appear expensive, especially when tested against some other medical interventions, such as cancer treatment and vaccination programmes. In this article, it is proposed that a comprehensive approach is taken to the issue of blood transfusion safety that considers all aspects of the process rather than considering only new measures. The need for an agreed level of safety for specified and unknown risks is also suggested. The importance of providing care and support for those inadvertently injured as a result of transfusion problems is also made. Given that the current blood safety decision process often uses a utilitarian principle for decision making--through the calculation of Quality Adjusted Life Years--an alternative philosophy is proposed. A social contract for blood safety, based on the principles of 'justice as fairness' developed by John Rawls, is recommended as a means of providing an agreed level of safety, containing costs and providing support for any adverse outcomes. © 2012 The Author. Transfusion Medicine © 2012 British Blood Transfusion Society.

  14. 48 CFR 215.403-1 - Prohibition on obtaining cost or pricing data (10 U.S.C. 2306a and 41 U.S.C. 254b).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost or pricing data (10 U.S.C. 2306a and 41 U.S.C. 254b). 215.403-1 Section 215.403-1 Federal... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.403-1 Prohibition on obtaining cost or pricing data (10 U.S.C. 2306a and 41 U.S.C. 254b). (b) Exceptions to cost or pricing data...

  15. What can transaction costs tell us about governance in the delivery of large scale HIV prevention programmes in southern India?

    PubMed

    Guinness, Lorna

    2011-06-01

    This paper aims to understand the transaction costs implications of two different governance modes for large scale contracting of HIV prevention services to non-governmental organisations (NGOs) in 2 states in India as part of the National AIDS Control Programme between 2001 and 2003. Interviews at purposively selected case study NGOs, contracting agencies and key informants as well as document review were used to compile qualitative data and make comparisons between the states on five themes theoretically proposed to shape transaction costs: institutional environment, informational problems, opportunism, scale of activity and asset specificity (the degree to which investments made specifically for the contract have value elsewhere). The State AIDS Control Society (SACS) in state Y used a management agency to manage the NGO contracts whereas the SACS in state X contracted directly with the NGOs. A high level of uncertainty, endemic corruption and weak information systems served to weaken the contractual relationships in both states. The management agency in state Y enabled the development of a strong NGO network, greater transparency and control over corrupt practises than the contract model in state X. State X's contractual process was further weakened by inadequate human resources. The application of the transaction cost framework to contracting out public services to NGOs identified the key costs associated with the governance of HIV prevention services through NGO contracts in India. A more successful form of relational contract evolved within the network of the contract management agency and the NGOs. This led to improved flows of information and perceived quality, and limited corrupt practises. It is unlikely that the SACS on its own, with broader responsibilities and limited autonomy can achieve the same ends. The management agency approach therefore appears to be both transaction cost reducing and better able to cope with the large scale of these contracting programmes. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. What can transaction costs tell us about governance in the delivery of large scale HIV prevention programmes in southern India?

    PubMed Central

    Guinness, Lorna

    2011-01-01

    This paper aims to understand the transaction costs implications of two different governance modes for large scale contracting of HIV prevention services to non-governmental organisations (NGOs) in 2 states in India as part of the National AIDS Control Programme between 2001 and 2003. Interviews at purposively selected case study NGOs, contracting agencies and key informants as well as document review were used to compile qualitative data and make comparisons between the states on five themes theoretically proposed to shape transaction costs: institutional environment, informational problems, opportunism, scale of activity and asset specificity (the degree to which investments made specifically for the contract have value elsewhere). The State AIDS Control Society (SACS) in state Y used a management agency to manage the NGO contracts whereas the SACS in state X contracted directly with the NGOs. A high level of uncertainty, endemic corruption and weak information systems served to weaken the contractual relationships in both states. The management agency in state Y enabled the development of a strong NGO network, greater transparency and control over corrupt practises than the contract model in state X. State X’s contractual process was further weakened by inadequate human resources. The application of the transaction cost framework to contracting out public services to NGOs identified the key costs associated with the governance of HIV prevention services through NGO contracts in India. A more successful form of relational contract evolved within the network of the contract management agency and the NGOs. This led to improved flows of information and perceived quality, and limited corrupt practises. It is unlikely that the SACS on its own, with broader responsibilities and limited autonomy can achieve the same ends. The management agency approach therefore appears to be both transaction cost reducing and better able to cope with the large scale of these contracting programmes. PMID:21349622

  17. A comparison of the costs of forest service and contract fire crews in the Pacific Northwest.

    Treesearch

    Geoffrey H. Donovan

    2005-01-01

    Rising wildfire suppression expenditures on public land in the United States have led to increased scrutiny of wildfire management practices. One area that has received particular attention is the Forest Service's increasing reliance on contract fire crews. Because a contract crew rate includes several costs that are not included in the wage costs of a Forest...

  18. 48 CFR 42.603 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Fully utilize the responsible contract audit agency financial and advisory accounting services... cost rates for cost-reimbursement contracts, (2) establishment of advance agreements or recommendations on corporate/home office expense allocations, and (3) administration of Cost Accounting Standards...

  19. 48 CFR 436.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...

  20. 48 CFR 436.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The contracting...

Top