PHMC post-NPH emergency response training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrads, T.J.
1997-04-08
This document describes post-Natural Phenomena Hazard (NPH) emergency response training that was provided to two teams of Project Hanford Management Contractors (PHMC) staff that will be used to assess potential structural damage that may occur as a result of a significant natural phenomena event. This training supports recent plans and procedures to use trained staff to inspect structures following an NPH event on the Hanford Site.
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waite, J.L.
1996-04-12
This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less
Production roll out plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less
Data management plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NGUYEN, D.M.
1999-06-01
The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NGUYEN, D.M.
1999-06-01
The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assure appropriate data will be collected to support the activity, ''Confirm Tank T is Acceptable for HLW Feed.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less
Operations system administration plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less
Environmental Management Performance Report June 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
EDER, D.M.
2000-06-01
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities asmore » extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Certa, P.J.
1998-01-07
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honeyman, J.O.
1998-01-09
This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
23 CFR 636.118 - Is team switching allowed after contract award?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...
23 CFR 636.118 - Is team switching allowed after contract award?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...
23 CFR 636.118 - Is team switching allowed after contract award?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...
23 CFR 636.118 - Is team switching allowed after contract award?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...
23 CFR 636.118 - Is team switching allowed after contract award?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...
Phase II test plan for the evaluation of the performance of container filling systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOGER, R.M.
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples andmore » will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.« less
Li, Zhen; Yang, Jian; Ye, Heng; Ding, Mingming; Luo, Feng; Li, Jianshu; Li, Jiehua; Tan, Hong; Fu, Qiang
2018-06-11
The degradation behaviors including oxidation and hydrolysis of silicone modified polycarbonate urethanes were thoroughly investigated. These polyurethanes were based on polyhexamethylene carbonate (PHMC)/polydimethylsiloxane (PDMS) mixed macrodiols with molar ratio of PDMS ranging from 5% to 30%. It was proved that PDMS tended to migrate toward surface and even a small amount of PDMS could form a silicone-like surface. Macrophages-mediated oxidation process indicated that the PDMS surface layer was desirable to protect the fragile soft PHMC from the attack of degradative species. Hydrolysis process was probed in detail after immersing in boiling buffered water using combined analytical tools. Hydrolytically stable PDMS could act as protective shields for the bulk to hinder the chain scission of polycarbonate carbonyls whereas the hydrolysis of urethane linkages was less affected. Although the promoted phase separation at higher PDMS fractions lead to possible physical defects and mechanical compromise after degradation, simultaneously enhanced oxidation and hydrolysis resistance could be achieved for the polyurethanes with proper PDMS incorporation.
Systemwide Implementation of Project-Based Learning: The Philadelphia Approach
ERIC Educational Resources Information Center
Schwalm, Jason; Tylek, Karen Smuck
2012-01-01
Citywide implementation of project-based learning highlights the benefits--and the challenges--of promoting exemplary practices across an entire out-of-school time (OST) network. In summer 2009, the City of Philadelphia and its intermediary, the Public Health Management Corporation (PHMC), introduced project-based learning to a network of more…
Design and Clinical Application of Proximal Humerus Memory Connector
NASA Astrophysics Data System (ADS)
Xu, Shuo-Gui; Zhang, Chun-Cai
2011-02-01
Treatment for comminuted proximal humerus fractures and nonunions are a substantial challenge for orthopedic surgeons. Plate and screw fixation does not provide enough stability to allow patients to begin functional exercises early after surgery. Using shape memory material nickel titanium alloy, we designed a new device for treating severe comminuted proximal humerus fractures that accommodates for the anatomical features of the proximal humerus. Twenty-two cases of comminuted fracture, malunion, and nonunion of the proximal humerus were treated with the proximal humeral memory connector (PHMC). No external fixation was needed after the operation and patients began active shoulder exercises an average of 8 days after the operation. Follow-up evaluation (mean 18.5 months) revealed that bone healing with lamellar bone formation occurred an average of 3.6 months after surgery for the fracture cases and 4.5 months after surgery for the nonunion cases. Average shoulder function was 88.5 according to the criteria of Michael Reese. PHMC is an effective new device to treat comminuted proximal humerus fractures and nonunions. The use of this device may reduce the need for shoulder joint arthroplasty.
Work performed by Enterprise Companies (Enco) for (PHMC) for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
Enterprise Companies are affiliated for the Prime and Major Subcontractors on site at Hanford. Business with them is handled and recorded in a manner very similar to working with independent vendors. In the to-be environment, all procurement of services from Enco`s will be processed in the Passport Procurement System.
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
2015-11-02
External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment Internal Review Team N O V E M B E R 2 , 2 0 1 5... MANAGEMENT AGENCY SUBJECT: External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment Internal Review Team...Report No. DODIG-2016-007) Attached is the External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... contracted directly with Correlix to use their RaceTeam latency measurement service for the Exchange's systems. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. Pricing for the Correlix RaceTeam product for the Exchange varies depending on the number of unique MPIDs and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-14
... contracted directly with Correlix to use their RaceTeam latency measurement service for the Exchange's systems. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. Pricing for the Correlix RaceTeam product for the Exchange varies depending on the number of unique acronyms and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
... received by Correlix from parties who have contracted directly with Correlix to use their RaceTeam latency measurement service for the Exchange. The Exchange will not bill or contract with any Correlix RaceTeam... for the Correlix RaceTeam product for users of the Exchange will be based on the number of ports...
Gibbard, Katherine; Griep, Yannick; De Cooman, Rein; Hoffart, Genevieve; Onen, Denis; Zareipour, Hamidreza
2017-01-01
With the knowledge that team work is not always associated with high(er) performance, we draw from the Multi-Level Theory of Psychological Contracts, Person-Environment Fit Theory, and Optimal Distinctiveness Theory to study shared perceptions of psychological contract (PC) breach in relation to shared perceptions of complementary and supplementary fit to explain why some teams perform better than other teams. We collected three repeated survey measures in a sample of 128 respondents across 46 teams. After having made sure that we met all statistical criteria, we aggregated our focal variables to the team-level and analyzed our data by means of a longitudinal three-wave autoregressive moderated-mediation model in which each relationship was one-time lag apart. We found that shared perceptions of PC breach were directly negatively related to team output and negatively related to perceived team member effectiveness through a decrease in shared perceptions of supplementary fit. However, we also demonstrated a beneficial process in that shared perceptions of PC breach were positively related to shared perceptions of complementary fit, which in turn were positively related to team output. Moreover, best team output appeared in teams that could combine high shared perceptions of complementary fit with modest to high shared perceptions of supplementary fit. Overall, our findings seem to indicate that in terms of team output there may be a bright side to perceptions of PC breach and that perceived person-team fit may play an important role in this process.
Gibbard, Katherine; Griep, Yannick; De Cooman, Rein; Hoffart, Genevieve; Onen, Denis; Zareipour, Hamidreza
2017-01-01
With the knowledge that team work is not always associated with high(er) performance, we draw from the Multi-Level Theory of Psychological Contracts, Person-Environment Fit Theory, and Optimal Distinctiveness Theory to study shared perceptions of psychological contract (PC) breach in relation to shared perceptions of complementary and supplementary fit to explain why some teams perform better than other teams. We collected three repeated survey measures in a sample of 128 respondents across 46 teams. After having made sure that we met all statistical criteria, we aggregated our focal variables to the team-level and analyzed our data by means of a longitudinal three-wave autoregressive moderated-mediation model in which each relationship was one-time lag apart. We found that shared perceptions of PC breach were directly negatively related to team output and negatively related to perceived team member effectiveness through a decrease in shared perceptions of supplementary fit. However, we also demonstrated a beneficial process in that shared perceptions of PC breach were positively related to shared perceptions of complementary fit, which in turn were positively related to team output. Moreover, best team output appeared in teams that could combine high shared perceptions of complementary fit with modest to high shared perceptions of supplementary fit. Overall, our findings seem to indicate that in terms of team output there may be a bright side to perceptions of PC breach and that perceived person-team fit may play an important role in this process. PMID:29170648
Notification: Audit of Region 7’s Superfund Technical Assessment and Response Team (START) Contract
Project #OA-FY14-0354, July 21, 2014. The EPA OIG plans to begin the preliminary research phase of an audit evaluating Region 7's monitoring for compliance under its Superfund Technical Assessment and Response Team (START) contract (EPS71306).
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
30 CFR 49.11 - Purpose and scope.
Code of Federal Regulations, 2012 CFR
2012-07-01
... TEAMS Mine Rescue Teams for Underground Coal Mines § 49.11 Purpose and scope. (a) This subpart... recovery. (b) The following Table 49.11 summarizes the new requirements for mine rescue teams contained in... Operators and Mine Rescue Teams Requirement Type of mine rescue team Mine-site Composite Contract State...
30 CFR 49.11 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-07-01
... TEAMS Mine Rescue Teams for Underground Coal Mines § 49.11 Purpose and scope. (a) This subpart... recovery. (b) The following Table 49.11 summarizes the new requirements for mine rescue teams contained in... Operators and Mine Rescue Teams Requirement Type of mine rescue team Mine-site Composite Contract State...
30 CFR 49.11 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TEAMS Mine Rescue Teams for Underground Coal Mines § 49.11 Purpose and scope. (a) This subpart... recovery. (b) The following Table 49.11 summarizes the new requirements for mine rescue teams contained in... Operators and Mine Rescue Teams Requirement Type of mine rescue team Mine-site Composite Contract State...
30 CFR 49.11 - Purpose and scope.
Code of Federal Regulations, 2014 CFR
2014-07-01
... TEAMS Mine Rescue Teams for Underground Coal Mines § 49.11 Purpose and scope. (a) This subpart... recovery. (b) The following Table 49.11 summarizes the new requirements for mine rescue teams contained in... Operators and Mine Rescue Teams Requirement Type of mine rescue team Mine-site Composite Contract State...
30 CFR 49.11 - Purpose and scope.
Code of Federal Regulations, 2013 CFR
2013-07-01
... TEAMS Mine Rescue Teams for Underground Coal Mines § 49.11 Purpose and scope. (a) This subpart... recovery. (b) The following Table 49.11 summarizes the new requirements for mine rescue teams contained in... Operators and Mine Rescue Teams Requirement Type of mine rescue team Mine-site Composite Contract State...
78 FR 39531 - Mine Rescue Teams
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... Administration 30 CFR Part 49 Mine Rescue Teams; CFR Correction #0;#0;Federal Register / Vol. 78 , No. 126... Health Administration 30 CFR Part 49 Mine Rescue Teams CFR Correction In Title 30 of the Code of Federal... Teams Type of mine rescue team Requirement Mine-site Composite Contract State-sponsored...
NASA Technical Reports Server (NTRS)
Hirshorn, Steven R.
2017-01-01
Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.
ERIC Educational Resources Information Center
Froman, Michael; Kosnoff, Kathy
1978-01-01
Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…
The Effect of Shared versus Individual Reflection on Team Outcomes
ERIC Educational Resources Information Center
Domke-Damonte, Darla J.; Keels, J. Kay
2015-01-01
In this study, teams in a strategic management classroom were given one of two versions of an assignment related to the development of a team contract: independent individual reflections on desired team behaviors versus team-level reflections on desired behavioral norms. Results of a multivariate analysis of covariance, controlling for gender and…
Energy Savings Performance Contract Energy Sales Agreement Toolkit
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.
2009-09-01
ABSTRACT (maximum 200 words) Alpha contracting is a collaborative effort between a buyer and supplier during contract formation to maximize efficiency...experienced Alpha contracting teams, to include contracting officers, DCAA, DCMA, end users/ customers , program managers and acquisition directors to better...PROCESSES, ISSUES, SUCCESS FACTORS AND CONSEQUENCES ABSTRACT Alpha contracting is a collaborative effort between a buyer and supplier
2010-08-12
Strategies to Enhance Online Learning Teams Team Assessment and Diagnostics Instrument and Agent-based Modeling Tristan E. Johnson, Ph.D. Learning ...REPORT DATE AUG 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Strategies to Enhance Online Learning ...TeamsTeam Strategies to Enhance Online Learning Teams: Team Assessment and Diagnostics Instrument and Agent-based Modeling 5a. CONTRACT NUMBER 5b. GRANT
Code of Federal Regulations, 2011 CFR
2011-10-01
... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection... competence; (B) Capability to perform; (C) Past performance of the offeror's team (including the architect... purposes and objectives of two-phase design-build contracting). (b) After evaluating phase-one proposals...
Code of Federal Regulations, 2013 CFR
2013-10-01
... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection... competence; (B) Capability to perform; (C) Past performance of the offeror's team (including the architect... purposes and objectives of two-phase design-build contracting). (b) After evaluating phase-one proposals...
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection... competence; (B) Capability to perform; (C) Past performance of the offeror's team (including the architect... purposes and objectives of two-phase design-build contracting). (b) After evaluating phase-one proposals...
Code of Federal Regulations, 2012 CFR
2012-10-01
... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection... competence; (B) Capability to perform; (C) Past performance of the offeror's team (including the architect... purposes and objectives of two-phase design-build contracting). (b) After evaluating phase-one proposals...
Code of Federal Regulations, 2014 CFR
2014-10-01
... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection... competence; (B) Capability to perform; (C) Past performance of the offeror's team (including the architect... purposes and objectives of two-phase design-build contracting). (b) After evaluating phase-one proposals...
Contractual obligations and the sharing of confidential health information in sport.
Anderson, L
2008-09-01
As an employee, a sports doctor has obligations to their employer, but also professional and widely accepted obligations of a doctor to the patient (in this case the individual team member). The conflict is evident when sports doctors are asked by an athlete to keep personal health information confidential from the coach and team management, and yet both doctor and athlete have employment contracts specifying that such information shall be shared. Recent research in New Zealand shows that despite the presence of an employment contract, there appears to be a wide range of behaviours among sports doctors when an athlete requests that information about them be kept from team management. Many seem willing to honour requests to keep health information about the athlete confidential, thereby being in breach of the employment contract, while others insist on informing team management against the wishes of the athlete. There are a number of potential solutions to this dilemma from forcing doctors to meet their contractual obligations, to limiting the expectations of the employment contract. This paper suggests that at times it may be appropriate to do both, making the position of the doctor clearer and supporting the ability of this group to resist pressure by coaches and management through having a robust code of ethics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
REICH, F.R.
The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization contractor from two double-shell feed tanks, 241-AP-102 and 241-AP-104. Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a nested, fixed-depth sampling system. This sampling system will provide large volume, representative samples without the environmental, radiation exposure, and sample volume impacts of the current base-line ''grab'' sampling method. A plan has been developed for the cold testing of this nested, fixed-depth sampling system with simulant materials. The sampling system willmore » fill the 500-ml bottles and provide inner packaging to interface with the Hanford Sites cask shipping systems (PAS-1 and/or ''safe-send''). The sampling system will provide a waste stream that will be used for on-line, real-time measurements with an at-tank analysis system. The cold tests evaluate the performance and ability to provide samples that are representative of the tanks' content within a 95 percent confidence interval, to sample while mixing pumps are operating, to provide large sample volumes (1-15 liters) within a short time interval, to sample supernatant wastes with over 25 wt% solids content, to recover from precipitation- and settling-based plugging, and the potential to operate over the 20-year expected time span of the privatization contract.« less
The Rosetta Science Archive: Status and Plans for Enhancing the Archive Content
NASA Astrophysics Data System (ADS)
Heather, David; Barthelemy, Maud; Besse, Sebastien; Fraga, Diego; Grotheer, Emmanuel; O'Rourke, Laurence; Taylor, Matthew; Vallat, Claire
2017-04-01
On 30 September 2016, Rosetta completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still ongoing with instrument teams preparing their final science data deliveries for ingestion into ESA's Planetary Science Archive (PSA). In addition, ESA is establishing contracts with some instrument teams to enhance their data and documentation in an effort to provide the best long-term archive possible for the Rosetta mission. Currently, the majority of teams have delivered all of their data from the nominal mission (end of 2015), and are working on their remaining increments from the 1-year mission extension. The aim is to complete the nominal archiving with data from the complete mission by the end of this year, when a full mission archive review will be held. This review will assess the complete data holdings from Rosetta and ensure that the archive is ready for the long-term. With the resources from the operational mission coming to an end, ESA has established a number of 'enhanced archiving' contracts to ensure that the best possible data are delivered to the archive before instrument teams disband. Updates are focused on key aspects of an instrument's calibration or the production of higher level data / information, and are therefore specific to each instrument's needs. These contracts are currently being kicked off, and will run for various lengths depending upon the activities to be undertaken. The full 'archive enhancement' process will run until September 2019, when the post operations activities for Rosetta will end. Within these contracts, most instrument teams will work on providing a Science User Guide for their data, as well as updating calibrations. Several teams will also be delivering higher level and derived products. For example, the VIRTIS team will be updating both their spectral and geometrical calibrations, and will aim to deliver mapping products to the final archive. Similarly, the OSIRIS team will be improving their calibrations and delivering data additionally in FITS format. The Rosetta Plasma Consortium (RPC) instruments will complete cross-calibrations and a number of activities individual to each instrument. The MIDAS team will also be working on cross-calibrations and will produce a dust particle catalog from the comet coma. GIADA will be producing dust environment maps, with products in 3D plus time. A contract also exists to produce and deliver data set(s) containing sup-porting ground-based observations from amateur astronomers. In addition to these contracts, the Rosetta ESA archiving team will produce calibrated data sets for the NAVCAM instrument, and will work to include the latest shape models from the comet into the final Rosetta archive. Work is also underway to provide a centralized solution to the problem of geometry on the comet. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned with the various instrument teams on Rosetta.
NASA Astrophysics Data System (ADS)
Wasielewska, K.; Ganzha, M.
2012-10-01
In this paper we consider combining ontologically demarcated information with Saaty's Analytic Hierarchy Process (AHP) [1] for the multicriterial assessment of offers during contract negotiations. The context for the proposal is provided by the Agents in Grid project (AiG; [2]), which aims at development of an agent-based infrastructure for efficient resource management in the Grid. In the AiG project, software agents representing users can either (1) join a team and earn money, or (2) find a team to execute a job. Moreover, agents form teams, managers of which negotiate with clients and workers terms of potential collaboration. Here, ontologically described contracts (Service Level Agreements) are the results of autonomous multiround negotiations. Therefore, taking into account relatively complex nature of the negotiated contracts, multicriterial assessment of proposals plays a crucial role. The AHP method is based on pairwise comparisons of criteria and relies on the judgement of a panel of experts. It measures how well does an offer serve the objective of a decision maker. In this paper, we propose how the AHP method can be used to assess ontologically described contract proposals.
Understanding and Mitigating Protests of Department of Defense Acquisition Contracts
2010-08-01
of delivery time that can lock out a rejected offeror from a market . Sixth, more complex contracts, like services versus products , generate more...The engineers, attorneys, or head of a business unit need to explain to the team that spent time working on a bid why the company lost. Executives...agency executives have to explain to their team, who also spent time working on the source solicitation, evaluation, and selection, why the company
Effective Team Support: From Modeling to Software Agents
NASA Technical Reports Server (NTRS)
Remington, Roger W. (Technical Monitor); John, Bonnie; Sycara, Katia
2003-01-01
The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and engineers and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in modeling infrastructure and task infrastructure. Work is continuing under a different contract to complete empirical data collection, cognitive modeling, and the building of software agents to support the teams task.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... received by Correlix from parties who have contracted directly with Correlix to use their RaceTeam latency...Team customer directly. Pricing for the Correlix RaceTeam product for the Exchange varies depending on..., Correlix will see an individualized unique Exchange-generated identifier that will allow Correlix RaceTeam...
NASA Astrophysics Data System (ADS)
Ebata, Takayuki
2017-06-01
The nonraddiative dececy route involving trans → cis photo-isomerization from the S_1 (ππ*) state has been investigated for several trans-cinnamate derivatives, which are known as sunscreen reagents. We examined two types of substitution effects. One is structural isomer such as ortho-, meta-, and para-hydroxy-methylcinnmate (o-, m-, p-HMC). The S_1 lifetime of p-HMC is less than 8 ps at zero-point level, and it undergoes rapid S_1 → ^1nπ* → T_1 decay via multiple conical intersections. Finally, the trans → cis isomerization proceeds in the T_1 state. On the other hand, both o- and m-HMC show very slow decay. Their S_1 lifetimes are in the order of 100 ps even at the excess energy of 2000-3000 \\wn. The other is the effect of the complexity of ester group in para-subsitituted species, such as para-methoxy-methyl, -ethyl and -2ethylhexyl cinnamate (p-MMC, p-MEC, p-M2EHC). p-MMC and p-MEC show sharp S_0 → S_1 (ππ*) vibronic bands, while p-M2EHC shows only broad structureless feature even under the jet-cooled condition. In addition, we found that the S_0 → ^1nπ* absorption appears at 1000 \\wn below the S_0 → S_1 (ππ*) transition in p-MEC and p-M2EHC, but not in p-MMC. Thus, the complexity of the ester group is very important for the appearance of the ^1nπ* state.
2010-12-15
MAGIC 2010 – FINAL REPORT RASR TEAM - CONTRACT NO: FA2386-10-1-4021 December 15, 2010 Final Report for AOARD Grant FA23861014021 – MAGIC ... MAGIC 2010 Competition - Robotic Research Team (RASR) Abstract: The RASR team developed a system for the coordination of groups of unmanned...accomplish those missions. Our team goal was to develop a system that can provide long term value to the war-fighter, utilizing MAGIC 2010 as a stepping
Trust in Culturally Diverse Teams
2008-09-01
Humansystems® Incorporated 111 Farquhar St., Guelph, ON N1H 3N4 Project Manager : Barbara D. Adams, Ph.D. (519) 836 5911 PWGSC Contract...on trust in teams and on the management of trust violations within these teams. Reserve force military personnel (n = 106) were recruited to...cultural diversity on trust in teams and on the management of trust violations within these teams. CF reserve force personnel (n = 106) were
Simulator Training Requirements and Effectiveness Study (STRES). Part 1. Abstract Bibliography
1981-01-01
august 1977 tnrougn January 19dU. The work was performed by a team made up of Canyon Research Group, Inc; Seville Research Corporation; and United...Dr. Thomas Eggemeier. A tri-service STRES Advisory Team participated in guiding and monitoring the work performed during this contract to assure its...8217 STRUCTURE OF THE STRES PROGRAM The primary objectives of STRES, as described in the contract Statement of Work for the present efforts, are to define
48 CFR 1315.305 - Proposal evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Proposal evaluation. 1315... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 1315.305 Proposal evaluation. At the... evaluation team. ...
Proposal Improvements That Work
NASA Technical Reports Server (NTRS)
Dunn, F.
1998-01-01
Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.
48 CFR 1852.236-75 - Partnering for construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... “partnership” used herein shall mean a relationship of open communication and close cooperation that involves... development and team building workshop. Follow-up team building workshops will be held periodically throughout...
Selfish play increases during high-stakes NBA games and is rewarded with more lucrative contracts.
Uhlmann, Eric Luis; Barnes, Christopher M
2014-01-01
High-stakes team competitions can present a social dilemma in which participants must choose between concentrating on their personal performance and assisting teammates as a means of achieving group objectives. We find that despite the seemingly strong group incentive to win the NBA title, cooperative play actually diminishes during playoff games, negatively affecting team performance. Thus team cooperation decreases in the very high stakes contexts in which it is most important to perform well together. Highlighting the mixed incentives that underlie selfish play, personal scoring is rewarded with more lucrative future contracts, whereas assisting teammates to score is associated with reduced pay due to lost opportunities for personal scoring. A combination of misaligned incentives and psychological biases in performance evaluation bring out the "I" in "team" when cooperation is most critical.
NASA technology applications team: Applications of aerospace technology
NASA Technical Reports Server (NTRS)
1993-01-01
This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.
A Quest for Efficiencies: Total System Performance Responsibility
2002-04-01
Program Office................................ 22 Contract Law Comments...resources and suppliers. 25 Contract Law Comments An integral member of any acquisition team is the legal expert(s) from the Staff Judge...Eglin AFB and Hanscom AFB were sent surveys in order to determine what cautions and concerns exist based on their contract law experiences. Getting
The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance
2016-06-30
AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT
Kilgas, Matthew A; Elmer, Steven J
2017-03-01
We implemented a team-based activity in our exercise physiology teaching laboratory that was inspired from Abbott et al.'s classic 1952 Journal of Physiology paper titled "The physiological cost of negative work." Abbott et al. connected two bicycles via one chain. One person cycled forward (muscle shortening contractions, positive work) while the other resisted the reverse moving pedals (muscle lengthening contractions, negative work), and the cost of work was compared. This study was the first to link human whole body energetics with isolated muscle force-velocity characteristics. The laboratory activity for our students ( n = 35) was designed to reenact Abbott et al.'s experiment, integrate previously learned techniques, and illustrate differences in physiological responses to muscle shortening and lengthening contractions. Students (11-12 students/laboratory section) were split into two teams (positive work vs. negative work). One student from each team volunteered to cycle against the other for ~10 min. The remaining students in each team were tasked with measuring: 1 ) O 2 consumption, 2 ) heart rate, 3 ) blood lactate, and 4 ) perceived exertion. Students discovered that O 2 consumption during negative work was about one-half that of positive work and all other physiological parameters were also substantially lower. Muscle lengthening contractions were discussed and applied to rehabilitation and sport training. The majority of students (>90%) agreed or strongly agreed that they stayed engaged during the activity and it improved their understanding of exercise physiology. All students recommended the activity be performed again. This activity was engaging, emphasized teamwork, yielded clear results, was well received, and preserved the history of classic physiological experiments. Copyright © 2017 the American Physiological Society.
The role of metrics and measurements in a software intensive total quality management environment
NASA Technical Reports Server (NTRS)
Daniels, Charles B.
1992-01-01
Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-14
... with Correlix to use their RaceTeam latency measurement service for the Exchange's systems. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. Pricing for the Correlix RaceTeam product for the Exchange varies depending on the number of unique acronyms and logons selected...
Toolsets Maintain Health of Complex Systems
NASA Technical Reports Server (NTRS)
2010-01-01
First featured in Spinoff 2001, Qualtech Systems Inc. (QSI), of Wethersfield, Connecticut, adapted its Testability, Engineering, and Maintenance System (TEAMS) toolset under Small Business Innovation Research (SBIR) contracts from Ames Research Center to strengthen NASA's systems health management approach for its large, complex, and interconnected systems. Today, six NASA field centers utilize the TEAMS toolset, including TEAMS-Designer, TEAMS-RT, TEAMATE, and TEAMS-RDS. TEAMS is also being used on industrial systems that generate power, carry data, refine chemicals, perform medical functions, and produce semiconductor wafers. QSI finds TEAMS can lower costs by decreasing problems requiring service by 30 to 50 percent.
Recipe for Success: Digital Viewables
NASA Technical Reports Server (NTRS)
LaPha, Steven; Gaydos, Frank
2014-01-01
The Engineering Services Contract (ESC) and Information Management Communication Support contract (IMCS) at Kennedy Space Center (KSC) provide services to NASA in respect to flight and ground systems design and development. These groups provides the necessary tools, aid, and best practice methodologies required for efficient, optimized design and process development. The team is responsible for configuring and implementing systems, software, along with training, documentation, and administering standards. The team supports over 200 engineers and design specialists with the use of Windchill, Creo Parametric, NX, AutoCAD, and a variety of other design and analysis tools.
Contingency Contracting Customer Guide
1996-12-01
I CONTINGENCY CONTRACTING CUSTOMER GUIDE PROJECT NUMBER: LC9619100 PROJECT MANAGER: CAPT TOM SNYDER TEAM MEMBERS MAJ JOHN PERRY CAPT ROBBIN VAUGHN...Report 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Contracting Deployment Customer Guide 6. AUTHOR(S) Capt.Thomas J. Snyder, AFLMA/LGC, DSN 596-4085 7...individual customers on the process, the customer support guide provides the necessary explanations without straining valuable manpower resources. The
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
... with Correlix to use their RaceTeam latency measurement service for the Exchange. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. \\3\\ For the purposes of this filing, the... RaceTeam product for users of the Exchange will be based on the number of ports requested by the user...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... directly with Correlix to use their RaceTeam latency measurement service for the NASDAQ Market Center. NASDAQ will not bill or contract with any Correlix RaceTeam customer directly. \\3\\ If approved, this...] proposed in SR-NASDAQ-2009-069 [sic]. Pricing for the Correlix RaceTeam product for the NASDAQ market...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
... with Correlix to use their RaceTeam latency measurement service for the Exchange. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. \\3\\ For the purposes of this filing, the... RaceTeam product for users of the Exchange will be based on the number of ports requested by the user...
NASA Technical Reports Server (NTRS)
Billingsley, Charles E.; Frederick, Larry
1993-01-01
The contract baseline, contract requirements review, contract modifications, contract problem areas and conclusions are addressed. Contract baseline was established 11 June 1987 and updated 1 December 1989. Significant changes were introduced into the 1989 baseline as compared to the original baseline. Contract modifications were made to add requirements as the program matured and as definition of requirements were completed. Problems were solved in real time through the contractor/customer team involvement and relationship to assure a timely and successful mission. The conclusion is that the CGF performed as designed and the experiments performed during the USML-1 Mission supports the conclusion.
Cyber as a Team Sport: Operationalizing a Whole-Of-Government Approach to Cyberspace Operations
2011-06-07
July 2010-7 June 2011 4. TITLE AND SUBTITLE • -~ ·- ~ I 5a. CONTRACT NUMBER CYBER AS A "TEAM SPORT ": OPERATIONALIZING A WHOLE-OF-GOVERNMENT APPROACH...JOINT FORCES STAFF COLLEGE JOINT ADVANCED WARFIGHTING SCHOOL CYBER AS A “TEAM SPORT ”: OPERATIONALIZING A WHOLE-OF- GOVERNMENT APPROACH...TO CYBERSPACE OPERATIONS by Elizabeth A. Myers Department of Defense CYBER AS A "TEAM SPORT ": OPERATIONALIZING A WHOLE-OF· GOVERNMENT
7 CFR 766.110 - Conservation Contract.
Code of Federal Regulations, 2010 CFR
2010-01-01
... floodplains; (iii) Areas of high water quality or scenic value; (iv) Historic or cultural properties listed in..., or 50 years. (e) Conservation management plan. The Agency, through the recommendations of the Conservation Contract review team, is responsible for approving the conservation management plan. (f...
48 CFR 1509.507-2 - Contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... include activities related to technical analyses in determining the nature and extent of contamination at... solicitations and contracts that provide professional architect/engineer, technical, and management services to...) Alternate II shall be used in all Superfund Technical Assistance and Removal Team (START) solicitations and...
7 CFR 766.110 - Conservation Contract.
Code of Federal Regulations, 2011 CFR
2011-01-01
... floodplains; (iii) Areas of high water quality or scenic value; (iv) Historic or cultural properties listed in..., or 50 years. (e) Conservation management plan. The Agency, through the recommendations of the Conservation Contract review team, is responsible for approving the conservation management plan. (f...
Viable Circumstances for Financial Negotiations in Pakistan Contracting Process
2015-06-01
Submission BIW Bath Iron Works BPA Blanket Purchase Agreement CERP Center for Economic Research in Pakistan CICA Competition in Contracting Act CJCS...IDIQ contracts, blanket purchase agreements ( BPAs ), and contractors team arrangements (CTAs) by fulfilling all pre-requisites of government...wide commercial purchase card (FAR 13.301) 2. Purchase orders (FAR 13.302) 3. Blanket purchase agreements ( BPAs ; FAR13.303) 4. Imprest fund and
Modelling Human Performance in Maritime Interdiction Operations
2010-10-01
tire relatively quickly compared to the legs. However, the arms and legs may be fatigued from the HSC insertion phase where muscular work will be...MI personnel include: • HSC Coxswain • Insertion/On-Target/Exfiltration phases – coping with Repeated Shock (RS), ( eccentric muscle contractions...and maintaining postural stability (isometric muscle contractions). • Boarding Team • Insertion – coping with RS ( eccentric muscle contractions), and
Postirradiation Testing Laboratory (327 Building)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kammenzind, D.E.
A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompassmore » health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Publish Grant and Contract Solicitations for Comparative Effectiveness Research (CER) Projects With Funds... input, the Comparative Effectiveness Research- Coordination Implementation Team, the Federal Coordinating Council for Comparative Effectiveness Research (FCC), and the Institute of Medicine Report on CER...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... RaceTeam latency measurement service for the Exchange. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. \\3\\ A ``User'' is defined in BATS Rule 1.5(cc) as any member or.... Pricing for the Correlix RaceTeam product for Users of the Exchange will be based on the number of ports...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... RaceTeam latency measurement service for the Exchange. The Exchange will not bill or contract with any Correlix RaceTeam customer directly. \\3\\ A ``User'' is defined in BYX Rule 1.5(cc) as any member or... Correlix RaceTeam product for Users of the Exchange will be based on the number of ports requested by the...
2018-05-04
ARL-TR-8359 ● MAY 2018 US Army Research Laboratory Enhancing Human–Agent Teaming with Individualized, Adaptive Technologies : A...with Individualized, Adaptive Technologies : A Discussion of Critical Scientific Questions by Arwen H DeCostanza, Amar R Marathe, Addison Bohannon...Enhancing Human–Agent Teaming with Individualized, Adaptive Technologies : A Discussion of Critical Scientific Questions 5a. CONTRACT NUMBER 5b
Fort Hood Army Internal Review Team: Final Report
2010-08-04
Report Date l August 4, 2010 Protecting our Army community at home & abroad Army Internal Review Team : Final Report Report Documentation Page Form...DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Fort Hood Army Internal Review Team : Final Report 5a. CONTRACT NUMBER 5b. GRANT...Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FoRt Hood Army Internal Review team : Final Report August 4, 2010 1 FoRt Hood Army
2015-07-14
AFRL-OSR-VA-TR-2015-0202 Robust Decision Making: The Cognitive and Computational Modeling of Team Problem Solving for Decision Making under Complex...Computational Modeling of Team Problem Solving for Decision Making Under Complex and Dynamic Conditions 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-12-1...functioning as they solve complex problems, and propose the means to improve the performance of teams, under changing or adversarial conditions. By
48 CFR 215.407-5-70 - Disclosure, maintenance, and review requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management systems (e.g., production control or cost accounting) with the estimating system so that the... disposition of the survey team findings. (g) Impact of estimating system deficiencies on specific proposals... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES...
Selfish Play Increases during High-Stakes NBA Games and Is Rewarded with More Lucrative Contracts
Uhlmann, Eric Luis; Barnes, Christopher M.
2014-01-01
High-stakes team competitions can present a social dilemma in which participants must choose between concentrating on their personal performance and assisting teammates as a means of achieving group objectives. We find that despite the seemingly strong group incentive to win the NBA title, cooperative play actually diminishes during playoff games, negatively affecting team performance. Thus team cooperation decreases in the very high stakes contexts in which it is most important to perform well together. Highlighting the mixed incentives that underlie selfish play, personal scoring is rewarded with more lucrative future contracts, whereas assisting teammates to score is associated with reduced pay due to lost opportunities for personal scoring. A combination of misaligned incentives and psychological biases in performance evaluation bring out the “I” in “team” when cooperation is most critical. PMID:24763384
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torcellini, Paul A; Scheib, Jennifer G; Pless, Shanti
New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changingmore » the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.« less
Economics in Counterinsurgency: Analyzing and Applying History’s Lessons on Economic Strategy
2014-06-13
Reconstruction and Humanitarian Affairs PCO Project and Contracting Office PRT Provincial Reconstruction Team SIGAR Special Inspector General for...and Contracting Office, or PCO , appear to have been unmindful of the historical ERP’s strengths and weaknesses. . . . One might say, without undue...purview of the US Embassy mission, which established the Iraqi Reconstruction and Management Office (IRMO) and the Project and Contracting Office ( PCO
Delivering radiology supplies just-in-time.
Clinton, M
1999-01-01
The radiology department at Dartmouth Hitchcock Medical Center (DHMC) adopted a just-in-time (JIT) inventory management system in 1992, reducing the volume of its in-house inventory of radiology supplies from a value of $400,000 to $16,000, just enough for four to five days of activity. An asset manager, the only person authorized to order supplies, was given responsibility for maintaining the department's supply of fixed and consumable assets. The first step in implementing the new system was to identify the supplies needed, standardize them and determine how often deliveries would be made. The JIT implementation team developed a request for proposal (RFP) that incorporated the standardized list of supplies. Three radiology supply vendors were invited to respond to the RFP. The team later determined that only one vendor was capable of implementing the JIT program. A three-year contract was awarded to that vendor. As that three-year contract reached completion, DHMC offered the JIT program to its eight affiliate hospitals and four outpatient clinics. The team decided to re-bid the contract for the entire network, which collectively performed 700,000 radiology exams annually. The new RFP encompassed 90 percent of the network's consumable supplies and offered customized delivery for each facility. The team identified eight criteria necessary for the evaluation of each vendor response to the RFP, rather than use price as the only consideration. The company that won the three-year contract furnished 90 percent of the radiology supplies for the DHMC network, allowing even further savings by the network, particularly for the smaller facilities and clinics. The program is continually monitored, adjusted and enhanced in order to incorporate changing departmental needs.
Contract Teamwork: A Way Out of the Ivory Tower.
ERIC Educational Resources Information Center
McMillan, Sally J.
How can teamwork be implemented effectively in university-level advertising classrooms? This paper reviews literature on the nature, structure, and function of teams and processes for managing teamwork. Based on this literature, an innovative approach to contract teamwork is introduced for use in an entry-level graduate course on integrated…
Advanced Radioisotope Power Conversion Technology Research and Development
NASA Technical Reports Server (NTRS)
Wong, Wayne A.
2004-01-01
NASA's Radioisotope Power Conversion Technology program is developing next generation power conversion technologies that will enable future missions that have requirements that cannot be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power System (RPS) technology. Performance goals of advanced radioisotope power systems include improvement over the state-of-practice General Purpose Heat Source/Radioisotope Thermoelectric Generator by providing significantly higher efficiency to reduce the number of radioisotope fuel modules, and increase specific power (watts/kilogram). Other Advanced RPS goals include safety, long-life, reliability, scalability, multi-mission capability, resistance to radiation, and minimal interference with the scientific payload. NASA has awarded ten contracts in the technology areas of Brayton, Stirling, Thermoelectric, and Thermophotovoltaic power conversion including five development contracts that deal with more mature technologies and five research contracts. The Advanced RPS Systems Assessment Team includes members from NASA GRC, JPL, DOE and Orbital Sciences whose function is to review the technologies being developed under the ten Radioisotope Power Conversion Technology contracts and assess their relevance to NASA's future missions. Presented is an overview of the ten radioisotope power conversion technology contracts and NASA's Advanced RPS Systems Assessment Team.
Plutonium Finishing Plant (PFP) Final Safety Analysis Report (FSAR) [SEC 1 THRU 11
DOE Office of Scientific and Technical Information (OSTI.GOV)
ULLAH, M K
2001-02-26
The Plutonium Finishing Plant (PFP) is located on the US Department of Energy (DOE) Hanford Site in south central Washington State. The DOE Richland Operations (DOE-RL) Project Hanford Management Contract (PHMC) is with Fluor Hanford Inc. (FH). Westinghouse Safety Management Systems (WSMS) provides management support to the PFP facility. Since 1991, the mission of the PFP has changed from plutonium material processing to preparation for decontamination and decommissioning (D and D). The PFP is in transition between its previous mission and the proposed D and D mission. The objective of the transition is to place the facility into a stablemore » state for long-term storage of plutonium materials before final disposition of the facility. Accordingly, this update of the Final Safety Analysis Report (FSAR) reflects the current status of the buildings, equipment, and operations during this transition. The primary product of the PFP was plutonium metal in the form of 2.2-kg, cylindrical ingots called buttoms. Plutonium nitrate was one of several chemical compounds containing plutonium that were produced as an intermediate processing product. Plutonium recovery was performed at the Plutonium Reclamation Facility (PRF) and plutonium conversion (from a nitrate form to a metal form) was performed at the Remote Mechanical C (RMC) Line as the primary processes. Plutonium oxide was also produced at the Remote Mechanical A (RMA) Line. Plutonium processed at the PFP contained both weapons-grade and fuels-grade plutonium materials. The capability existed to process both weapons-grade and fuels-grade material through the PRF and only weapons-grade material through the RMC Line although fuels-grade material was processed through the line before 1984. Amounts of these materials exist in storage throughout the facility in various residual forms left from previous years of operations.« less
Coaches' Contracts Are Fertile Ground for Conflict
ERIC Educational Resources Information Center
Sander, Libby; Fain, Paul
2009-01-01
Billy Gillispie, like many college basketball coaches, was hired--and fired--in a hurry. But the contract negotiations that dragged on for nearly two years while he coached the University of Kentucky's men's basketball team showed little of the same urgency that defined his entrance and exit. Mr. Gillispie worked for Kentucky under a memorandum of…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... contracted directly with Correlix to use its RaceTeam latency measurement service for the NASDAQ Market... Correlix RaceTeam offering,\\3\\ and thereafter approved codification in NASDAQ's rules of fees imposed by..., to foster cooperation and coordination with persons engaged in regulating, clearing, settling...
2007-06-16
ORGANIZATIONAL LEADERSHIP IN CRISIS : THE 31ST REGIMENTAL COMBAT TEAM AT CHOSIN RESERVOIR, KOREA, 24 NOVEMBER - 2 DECEMBER 1950 A...From - To) Aug 2006 - Jun 2007 5a. CONTRACT NUMBER 5b. GRANT NUMBER 4. TITLE AND SUBTITLE ORGANIZATIONAL LEADERSHIP IN CRISIS : THE 31ST...Berquist Thesis Title: Organizational Leadership in Crisis : The 31st Regimental Combat Team at Chosin Reservoir, Korea, 24 November – 2 December 1950
Streamlining the Acquisition Process: A DCAA Field-Grade Perspective
2014-03-01
Initial Capabilities Document IFRS International Financial Reporting Standards IPT Integrated Product Team IRR Independent Reference Review...the responsibilities, programmed focus, strategic plan and recent events impacting the organization. B. DEFENSE CONTRACT AUDIT AGENCY 1. DCAA...material misstatements, whether caused by error or fraud. The type of audit requested by the contracting officer will directly impact both the
ERIC Educational Resources Information Center
Johnson, Kevin A.
2012-01-01
The purpose of this quantitative correlational study was to examine the possible relationship between transformational leadership style behaviors and the influence it had on employee satisfaction. The information presented in this study involved virtual team members at the Defense Contract Management Agency, Navy Special Emphasis Operations. The…
ERIC Educational Resources Information Center
Brown, Michael H.
This document presents a case history of an 80-hour consulting contract undertaken in 1984 whereby a human resources consultant provided training in team building, communication skills, and creative problem solving to the management team of the Water Revenue Department (WRD) of the government of the District of Columbia. The troubled history of…
National Remodelling Team: Evaluation and Impact Study (Year 1) Final Report
ERIC Educational Resources Information Center
Wilson, Rebekah; Easton, Claire; Smith, Paula; Sharp, Caroline
2005-01-01
The National Remodelling Team (NRT) was established in April 2003 by the Department for Education and Skills (DfES) and hosted within the National College for School Leadership (NCSL). The role of the NRT was to work with local education authorities (LEAs) to support schools in the implementation of the changes to teachers' contracts introduced by…
Source Selection Simulation: Intact Team Training on Picking a Provider
2015-06-01
seat of a new $100 million stealth fighter before giving her flight simulation time. The ar- gument for source-selection simulation ( SSS ) training is...dynamic is the creation of the SSS Tool. Drawing on his success in using a similar tool in contingency contracting, Long decided we should use a Web...of SSS intact team training. On Sept. 30–Oct. 3, 2014, Professors Long and Elsesser de- livered DAU’s first-ever Intact Team SSS Training to Eglin’s
Addicott, Rachael
2016-01-01
For many years there has been a separation between purchasing and provision of services in the English National Health Service (NHS). Many studies report that this commissioning function has been weak: purchasers have had little impact or power in negotiations with large acute providers, and have had limited strategic control over the delivery of care. Nevertheless, commissioning has become increasingly embedded in the NHS structure since the arrival of Clinical Commissioning Groups (CCGs) in 2012. Recently, some of these CCGs have focused on how they can contract and commission in different ways to stimulate greater collaboration across providers. This paper examines experiences of commissioning and contracting for integrated care in the English NHS, based on a series of national-level interviews and case studies of five health economies that are implementing novel contracting models. The cases illustrated here demonstrate early experiments to drive innovation through contracting in the NHS that have largely relied on the vision of individual teams or leaders, in combination with external legal, procurement and actuarial support. It is unlikely that this approach will be sustainable or replicable across the country or internationally, despite the best intentions of commissioners. Designing and operating novel contractual approaches will require considerable determination, alongside advanced skills in procurement, contract management and commissioning. The cost of developing new contractual approaches is high, and as the process is difficult and resource-intensive, it is likely that dedicated teams or programs will be required to drive significant improvement.
14th Annual Small Business Conference
2010-11-18
Government Contracting, Small Business Administration 5:45 pm - 7:45 pm RECEPTION IN DISPLAY AREA 14TH ANNUAL SMALL BUSINESS CONFERENCE...as a lobbyist for a large multi-national conglomerate that included among its subsidiaries movie companies, sports teams, financial services companies...Past Performance /Small Business Participation > M.1 Basis of Award: The Government plans to award a single contract for the Fighting Trailer
Defense AT and L Magazine. Vol. 45, no. 5, September-October 2016
2016-09-01
standard federal assistance awards. These contractors might be small, startup technology firms supported by venture capital, leading-edge technology...to provide effective contract oversight and present an accurate picture of contractor performance to the procuring contracting office. Lesson...mission footprints encompass a great deal of contractor activity, leadership that is not regularly engaged with the acquisition team often gives
ERIC Educational Resources Information Center
Adler, Terry R.
2005-01-01
The Swift Trust exercise provides instructors with the opportunity to discuss the issues of managing trust and distrust perceptions in a team-based design. Lewicki, McAllister, and Bies's (1998) framework is used to allow students to experience the difficulties of deriving a common set of contract requirements based on team dynamics and…
Carpet in Andrews High School. A Report by the Carpet Evaluation Team.
ERIC Educational Resources Information Center
Wallace, Morris S.; And Others
In the spring of 1965, the Board of Trustees of Andrews Independent School District entered into a contract with the carpet evaluation team to analyze and evaluate the use of carpeting in the Andrews Public Schools, with emphasis on the senior high school. The two $5,000 grants served as the basis for paying for the expenses and professional…
Automated Program Analysis for Cybersecurity (APAC)
2016-07-14
AUTOMATED PROGRAM ANALYSIS FOR CYBERSECURITY (APAC) FIVE DIRECTIONS, INC JULY 2016 FINAL TECHNICAL REPORT APPROVED... CYBERSECURITY (APAC) 5a. CONTRACT NUMBER FA8750-14-C-0050 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 61101E 6. AUTHOR(S) William Arbaugh...AC Team Adversarial Challenge Team, responsible for creating malicious applications APAC Automated Program Analysis for Cybersecurity BAE BAE Systems
48 CFR 301.607-71 - FAC-P/PM levels and requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...
48 CFR 301.607-71 - FAC-P/PM levels and requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...
48 CFR 301.607-71 - FAC-P/PM levels and requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...
DOE Office of Scientific and Technical Information (OSTI.GOV)
MH Lane
2006-02-15
This letter forwards a compilation of knowledge gained regarding international interactions and issues associated with Project Prometheus. The following topics are discussed herein: (1) Assessment of international fast reactor capability and availability; (2) Japanese fast reactor (JOYO) contracting strategy; (3) NRPCT/Program Office international contract follow; (4) Completion of the Japan Atomic Energy Agency (JAEA)/Pacific Northwest National Laboratory (PNNL) contract for manufacture of reactor test components; (5) US/Japanese Departmental interactions and required Treaties and Agreements; and (6) Non-technical details--interactions and considerations.
1984-09-01
Harms, Assistant Director for Management Support, and LT% Mike Deems, who was the Contracting Officer’s Representative for the HERO contract. COMMENTS...A1ND gJESTIONS may be directed to US Army Concep*s Aialysis Agency, ATTN: Assistint Director for Management Support, 8120 .uodriont Avenue, Bethesda...APPENDIX A STUDY CONTRIBUTORS 1. STUDY TEAM. Management and Support Directorate. Report Author: Lelma M. Harms Contract COTR: LTC J. M. Deems 2. EXTERNAL
ERIC Educational Resources Information Center
Johnson, Kelli; Weiss, Iris R.
2011-01-01
In 1995, the National Science Foundation (NSF) contracted with principal investigator Iris Weiss and an evaluation team at Horizon Research, Inc. (HRI) to conduct a national evaluation of the Local Systemic Change for Teacher Enhancement program (LSC). HRI conducted the core evaluation under a $6.25 million contract with NSF. This program…
East Europe Report, Economic and Industrial Affairs.
1984-06-07
undeniable that even objectivized norms often lack the required quality. Many of them have not been determined by dependable analytical met methods ...incentive methods , such as, for example, contract wages and their various modifications, are applied only to a limited extent. Many economic managers...discipline. Method of the Future—Work Team Khozrashchet We have been testing and gradually expanding work team forms of labor organiza- tion and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
Deprez, Dieter N; Fransen, Job; Lenoir, Matthieu; Philippaerts, Renaat M; Vaeyens, Roel
2015-06-01
The goal of this article was twofold, and a 2-study approach was conducted. The first study aimed to expose the anthropometrical, physical performance, and motor coordination characteristics that influence dropout from a high-level soccer training program in players aged 8-16 years. The mixed-longitudinal sample included 388 Belgian youth soccer players who were assigned to either a "club group" or a "dropout group." In the second study, cross-sectional data of anthropometry, physical performance, and motor coordination were retrospectively explored to investigate which characteristics influence future contract status (contract vs. no contract group) and first-team playing time for 72 high-level youth soccer players (mean age = 16.2 years). Generally, club players outperformed their dropout peers for motor coordination, soccer-specific aerobic endurance, and speed. Anthropometry and estimated maturity status did not discriminate between club and dropout players. Contract players jumped further (p = 0.011) and had faster times for a 5-m sprint (p = 0.041) than no contract players. The following prediction equation explains 16.7% of the variance in future playing minutes in adolescent youth male soccer players: -2,869.3 + 14.6 × standing broad jump. Practitioners should include the evaluation of motor coordination, aerobic endurance, and speed performances to distinguish high-level soccer players further succeeding a talent development program and future dropout players, between 8 and 16 years. From the age of 16 years, measures of explosivity are supportive when selecting players into a future professional soccer career.
Hierons, R J; Gerrard, G; Jones, R
2017-06-09
Primary care oral surgery services vary markedly throughout the country but until now there has been a paucity of data on these services. The British Association of Oral Surgeons (BAOS) primary care group (the authors) were tasked to gather data around primary care oral surgery contracts and tariffs and provide evidence-based recommendations on the commissioning of these services. Following a freedom of information (FOI) request, data were obtained for 27 English local area teams and seven Welsh local health boards. The data demonstrated both regional and national variability with respect to primary care oral surgery contracts, concerning both contract type and level of remuneration. These differences are discussed and the authors make recommendations for standardising oral surgery contracts and tariffs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
2005-05-01
Standish Group 1995a; 1995b). In general , the risk of failure for large software projects is significantly greater than for small projects (Humphrey...learning, geographical dispersion, and team experience. Various weighting schemes can be developed and applied to these parameters for various...Fadtool DbCAS/ WebCAS ObligationsFunding data COPS MDMS Committments Obligations Committments PADDS Obligations EDA Contracts CAPS Contracts Document
48 CFR 873.105 - Acquisition planning.
Code of Federal Regulations, 2012 CFR
2012-10-01
... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...
48 CFR 873.105 - Acquisition planning.
Code of Federal Regulations, 2011 CFR
2011-10-01
... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...
48 CFR 873.105 - Acquisition planning.
Code of Federal Regulations, 2014 CFR
2014-10-01
... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...
48 CFR 873.105 - Acquisition planning.
Code of Federal Regulations, 2013 CFR
2013-10-01
... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...
48 CFR 873.105 - Acquisition planning.
Code of Federal Regulations, 2010 CFR
2010-10-01
... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...
Case study on industrial hazmat response teams.
Stephens, Shelly J
2009-11-01
In 1991, Amway formed an industrial hazardous materials (hazmat) team in order to respond quickly and efficiently to potential chemical spills. The company's goals were, and still are today, to protect employees, the environment and the local community, and to reduce the amount of resulting downtime. In 1991, the hazmat team was very well funded, enabling it to become a discrete department with its own management staff and nearly 100 hazmat volunteers. Due to changes in the business climate, Amway reorganised in 2000/01, and the hazmat team became part of a company that incorporated contract work into its scope. When this reorganisation occurred, the hazmat team was thoroughly re-evaluated. Its response function was maintained, but was systematically reinvented in the most lean way practicable while still meeting corporate goals. This case study represents Amway's hazmat team's journey through the evaluation process and subsequent reorganisation.
NASA Technical Reports Server (NTRS)
1997-01-01
In response to Clause 17 of the Cooperative Agreement NCC8-115, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. Contract award was announced on July 2, 1996 and the first milestone was hand delivered to NASA MSFC on July 17, 1996. The first year has been one of growth and progress as all team members staffed up and embarked on the technical adventure of the 20th century... the ultimate goal . . a Single Stage to Orbit (SSTO) Reuseable Launch Vehicle (RLV).
RESULTS OF THE ENVIRONMENTAL MANAGEMENT (EM) CORPORATE PROJECT TEAM DISPOSING WASTE & REDUCING RISK
DOE Office of Scientific and Technical Information (OSTI.GOV)
SHRADER, T.A.; KNERR, R.
2005-01-31
In 2002, the US Department of Energy's (DOE) Office of Environmental Management (EM) released the Top-To-Bottom Review of cognizant clean-up activities around the DOE Complex. The review contained a number of recommendations for changing the way EM operates in order to reduce environmental risk by significantly accelerating clean-up at the DOE-EM sites. In order to develop and implement these recommendations, a number of corporate project teams were formed to identify, evaluate, and initiate implementation of alternatives for the different aspects of clean-up. In August 2002, a corporate team was formed to review all aspects of the management, treatment, and disposalmore » of low level radioactive waste (LLW), mixed low level radioactive waste (MLLW), transuranic waste (TRU), and hazardous waste (HW). Over the next 21 months, the Corporate Project Team: Disposing Waste, Reducing Risk, developed a number of alternatives for implementing the recommendations of the Top-To-Bottom Review based on information developed during numerous site visits and interviews with complex and industry personnel. With input from over a dozen EM sites at various stages of clean-up, the team identified the barriers to the treatment and disposal of low level waste, mixed low level waste, and transuranic waste. Once identified, preliminary design alternatives were developed and presented to the Acquisition Authority (for this project, the Assistant Secretary for Environmental Management) for review and approval. Once the preliminary design was approved, the team down selected to seven key alternatives which were subsequently fully developed in the Project Execution Plan. The seven most viable alternatives were: (1) creation of an Executive Waste Disposal Board; (2) projectizing the disposal of low level waste and mixed low level waste; (3) creation of a National Consolidation and Acceleration Facility for waste; (4) improvements to the Broad Spectrum contract; (5) improvements to the Toxic Substance Control Act (TSCA) Incinerator contract and operations; (6) development of a policy for load management of waste shipments to the Waste Isolation Pilot Plant (WIPP); and (7) development of a complex-wide fee incentive for transuranic waste disposal. The alternatives were further refined and a plan developed for institutionalizing the alternatives in various site contracts. In order to focus the team's efforts, all team activities were conducted per the principles of DOE Order 413.3, Program and Project Management for the Acquisition of Capital Assets. Although the Order was developed for construction projects, the principles were adapted for use on this ''soft'' project in which the deliverables were alternatives for the way work was performed. The results of the team's investigation and the steps taken during the project are presented along with lessons learned.« less
[Experiences in maintenance and repair cost control of medical equipments].
Liu, Jin-chu; Wu, Yun-fang
2005-07-01
This paper introduces methods to control the cost of maintenance and repair for medical equipments through service team training, service contract control, system establishment and outside service resources, etc..
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2010 CFR
2010-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress
2017-01-10
Development (TD) Phase to three industry teams: (1) BAE Systems, (2) the team of Lockheed Martin and General Tactical Vehicle, and (3) AM General and...Lockheed Martin Corporation (Grand Prairie, TX); and Oshkosh Corporation (Oshkosh, WI). On September 3, 2013, the Army began JLTV testing at Aberdeen...who were picked in 2012 to build prototypes—Oshkosh, Lockheed Martin , and AM General—submitted their bids for the LRIP contract by the February 10
Container Management: A Necessary Strategy for Improved Efficiencies
2013-03-01
and carrier-owned containers under the USTRANSCOM USC or other applicable contract.21 Re-organize mobile container assessment teams ( MCAT ) with...warrant officer or field grade officers in charge. The MCATs are a great concept, but when a team shows up with a young Captain or Lieutenant and a...and a master sergeant or sergeant major on the MCAT , they will be more effective and better supported. Plenty of quality field grade Logistics Corps
2011-10-01
performance metrics; and development of Robotic OR Team training including crisis management. Q3: During the third quarter of this project, the...literature review for robot-assisted surgical skill training/performance metrics; development of Robotic OR Team training materials including crisis ... crisis management situations. Q2: Contract negotiations for the purchase of the da Vinci Skills Simulator are completed and we anticipate the
2008-09-16
interests are strategic resource management, strategic control, and corporate financial reporting. Joseph G. San Miguel Professor Graduate School of...Missile Defense PEO – Program Executive Officer PM – Program Manager SAIC – Science Applications International Corporation SAP – Systems Applications...International Corporation (SAIC) team (DoD, 2002). In addition to providing important personnel, the LSI team would provide an important advantage in
Process Improvement for Interinstitutional Research Contracting
Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca
2015-01-01
Abstract Introduction Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. Methods The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Results Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the “business entity” was the research support personnel of both healthcare systems whose “customers” were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). Conclusions The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. PMID:26083433
Process Improvement for Interinstitutional Research Contracting.
Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca
2015-08-01
Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.
Basis for Interim Operation for Fuel Supply Shutdown Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENECKE, M.W.
2003-02-03
This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less
National Aeronautics and Space Administration technology application team program
NASA Technical Reports Server (NTRS)
1972-01-01
Contracts are reported between the RTI TATeam and the National Aeronautics and Space Administration (NASA), the Environmental Protection Agency (EPA), and other governmental, educational, and industrial organizations participating in NASA's Technology Utilization Program.
23 CFR 636.204 - What items may be included in a phase-one solicitation?
Code of Federal Regulations, 2013 CFR
2013-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.204... perform (including key personnel); and (iii) Past performance of the members of the offeror's team...
23 CFR 636.204 - What items may be included in a phase-one solicitation?
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.204... perform (including key personnel); and (iii) Past performance of the members of the offeror's team...
23 CFR 636.204 - What items may be included in a phase-one solicitation?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.204... perform (including key personnel); and (iii) Past performance of the members of the offeror's team...
23 CFR 636.204 - What items may be included in a phase-one solicitation?
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.204... perform (including key personnel); and (iii) Past performance of the members of the offeror's team...
23 CFR 636.204 - What items may be included in a phase-one solicitation?
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.204... perform (including key personnel); and (iii) Past performance of the members of the offeror's team...
High Energy Astrophysics Research and Programmatic Support
NASA Technical Reports Server (NTRS)
Angellini, L.
1994-01-01
This report reviews activities performed by members of the USRA contract team during the three months of the reporting period. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics.
Preliminary Design Phases, Part of Indoor Air Quality Design Tools for Schools
The typical design process for schools begins with programming and selection of the architectural-engineering team. It then proceeds through schematic design, design development, contract documents, construction, commissioning and occupancy.
2012-04-25
totaling $151 million for a program called Stabilization in Key Areas ( SIKA ). This report assesses (1) the cost and outcomes of the LGCD project and...services to be provided, SIGAR recommends that the Mission Director, USAID/Afghanistan, direct contracting officers to ensure that the SIKA contracts...Provincial Reconstruction Team RFTOP Request for Task Order Proposal SIGAR Special Inspector General for Afghanistan Reconstruction SIKA Stabilization
Alaskan Marine Highway System analysis.
DOT National Transportation Integrated Search
2011-10-01
The Alaska Department of Transportation and Public Facilities (DOT&PF) has contracted with a team of consultants, led by the University of Alaska Fairbanks, to conduct a comprehensive analysis of the Alaska Marine Highway System (AMHS) and make recom...
NASA Technical Reports Server (NTRS)
Remington, Roger W. (Technical Monitor); John, Bonnie E.; Sycara, Katia
2005-01-01
The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in completing a system for empirical data collection, cognitive modeling, and the building of software agents to support a team's tasks, and in running experiments for the collection of baseline data.
NASA Technical Reports Server (NTRS)
Quach, Quyen T.; Zala, Laszlo F.
2002-01-01
The governor of the State of Ohio signed amended substitute Senate bill 3 on July 6, 1999, requiring Ohio's electric industry to change from a monopoly environment to a competitive electric environment for generation services. The start date for competitive retail generation services was set for January 1, 2001. This new deregulation law allowed all Ohioans to choose the supplier of generation service, but the transmission and distribution would remain regulated. It also required electric utilities to unbundle the three main components (generation, transmission, and distribution) and make other changes designed to produce a competitive electric generation market. While deregulation was taking shape, the NASA Glenn Research Center electrical contract with FirstEnergy Corp. of Cleveland, Ohio, was to expire on September 7, 1999. Glenn strategically evaluated and incorporated the impacts of electric deregulation in the negotiations. Glenn and FirstEnergy spent over a year in negotiations until the Glenn utility team and the FirstEnergy negotiating team came to an agreement in the fall of 2000, and a new contract became effective on January 1, 2001.
STS-121: Discovery Mission Management Team Briefing
NASA Technical Reports Server (NTRS)
2006-01-01
The briefing opened with Bruce Buckingham (NASA Public Affairs) introducing John Shannon (Chairman, Mission Management Team, JSC), John Chapman (External Tank Project Manager), Mike Leinbach (Shuttle Launch Director), and 1st Lt. Kaleb Nordgren (USAF 45th Weather Squadron). John Shannon reported that the team for hydrogen loading was proceeding well and the external tank detanking was completed. During detanking the inspection team cracked foam caused by condensation and ice formation as the tank expanded and contracted. Aerothermal analysis and analysis fro ice formation will be completed before launch. John Chapman explained the mechanics of the external tank design, the foam cracking, bracket design, etc. Mike Leinbach discussed the inspection teams and their inspection final inspection for ice formation before and after external tank filling. The inspection team of eight very experienced personnel also use telescopes with cameras to find any problems before launch. Kaleb Nordgren discussed weather and said there was a 40% chance of weather prohibiting launch. The floor was the opened for questions from the press.
Medical device innovation and the value analysis process.
Krantz, Heidi; Strain, Barbara; Torzewski, Jane
2017-09-01
Heidi A. Krantz, RN, BSN is the Director of Value Analysis at Johns Hopkins Bayview Medical Center in the Johns Hopkins Health System. Barbara Strain, MA, CVAHP is the Director of Value Management at the University of Virginia Health System. Jane Torzewski RN, MAN, MBA is a Senior Category Manager for the Mayo Clinic Physician Preference Contracting team. She previously was a Senior Clinical Value Analyst on the Mayo Clinic Value Analysis team. Copyright © 2018. Published by Elsevier Inc.
2016-09-23
Lauren Menke3 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER H0HJ (53290813) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS...as prior work has demonstrated that friendship can facilitate performance in decision-making and motor tasks (e.g., Shah & Jehn, 1993). However, a...Relationship between Team Performance and Joint Attention with Longitudinal Multivariate Mixed Models 5a. CONTRACT NUMBER FA8650-14-D-6501-0009 5b
Price trends for federal-aid highway construction : 1987 base, second quarter 1997
DOT National Transportation Integrated Search
1999-03-01
This summary report highlights the March 1998 Federal Highway Administration (FHWA) scanning team organized to review and document developments in load and resistance factor design (LRFD) methods and alternative contracting practices related to geote...
WATER TREATMENT AND EDUCATION IN VILLAHERMOSA, MEXICO
The interdisciplinary P3 team included mechanical, civil and environmental, and electrical engineers. This was critical to overcome the technical challenges presented by this project. A successful full-scale system was developed that greatly reduces the probability of contract...
Innovative contracting practices for ITS : task E : final report
DOT National Transportation Integrated Search
1999-07-01
The Peer Exchange is a process adopted by the Office of Motor Carrier and Highway Safety in which teams of professionals, representing state and federal government and private industry, identify effective commercial motor vehicle safety findings for ...
Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less
NASA Astrophysics Data System (ADS)
Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd
2018-04-01
The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.
2012-09-19
CAPE CANAVERAL, Fla. -- NASA's Commercial Crew Program, or CCP, hosts a pre-proposal conference to inform prospective companies about the recently released request for contract proposals and updates to the certification requirements for crewed missions to the International Space Station, or ISS. The two-phase certification process, called Certification Products Contract, or CPC, will enable NASA to eventually purchase service missions to fly astronauts to and from the ISS. From left, Ed Mango, CCP's program manager Steve Janney, CPC contracting officer Maria Collura, CCP certification manager Tom Simon, CPC Evaluation Team chair Brent Jett, CCP deputy program manager and Kathy Lueders, manager of the ISS Transportation Integration Office. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Kim Shiflett
2012-09-19
CAPE CANAVERAL, Fla. -- NASA's Commercial Crew Program, or CCP, hosts a pre-proposal conference to inform prospective companies about the recently released request for contract proposals and updates to the certification requirements for crewed missions to the International Space Station, or ISS. The two-phase certification process, called Certification Products Contract, or CPC, will enable NASA to eventually purchase service missions to fly astronauts to and from the ISS. From left, Ed Mango, CCP's program manager Steve Janney, CPC contracting officer Maria Collura, CCP certification manager Tom Simon, CPC Evaluation Team chair Brent Jett, CCP deputy program manager and Kathy Lueders, manager of the ISS Transportation Integration Office. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Kim Shiflett
36 CFR 906.4 - Formulation of affirmative action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... development from establishment of the development team to operation and management of the development project... component, the developer should give consideration to creating business and employment opportunities and... connection with construction and operation; (4) Contracting for construction, operation, and maintenance; and...
Collins, Allan J; Foley, Robert N; Gilbertson, David T; Chen, Shu-Cheng
2015-06-01
The United States Renal Data System (USRDS) began in 1989 through US Congressional authorization under National Institutes of Health competitive contracting. Its history includes five contract periods, two of 5 years, two of 7.5 years, and the fifth, awarded in February 2014, of 5 years. Over these 25 years, USRDS reporting transitioned from basic incidence and prevalence of end-stage renal disease (ESRD), modalities, and overall survival, as well as focused special studies on dialysis, in the first two contract periods to a comprehensive assessment of aspects of care that affect morbidity and mortality in the second two periods. Beginning in 1999, the Minneapolis Medical Research Foundation investigative team transformed the USRDS into a total care reporting system including disease severity, hospitalizations, pediatric populations, prescription drug use, and chronic kidney disease and the transition to ESRD. Areas of focus included issues related to death rates in the first 4 months of treatment, sudden cardiac death, ischemic and valvular heart disease, congestive heart failure, atrial fibrillation, and infectious complications (particularly related to dialysis catheters) in hemodialysis and peritoneal dialysis patients; the burden of congestive heart failure and infectious complications in pediatric dialysis and transplant populations; and morbidity and access to care. The team documented a plateau and decline in incidence rates, a 28% decline in death rates since 2001, and changes under the 2011 Prospective Payment System with expanded bundled payments for each dialysis treatment. The team reported on Bayesian methods to calculate mortality ratios, which reduce the challenges of traditional methods, and introduced objectives under the Health People 2010 and 2020 national health care goals for kidney disease.
NASA Technical Reports Server (NTRS)
1999-01-01
In response to Clause 17 of the Cooperative Agreement NCC8-115, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. Contract award was announced on July 2, 1996 and the first milestone was hand delivered to NASA MSFC on July 17, 1996. With the dedication of the launch site, and continuing excellence in technological achievement, the third year of the Cooperative Agreement has been one of outstanding accomplishment and excitement.
The Scientific Art of Contract Negotiations.
ERIC Educational Resources Information Center
Kuo, Kent; Wilson, Nancy
2001-01-01
Discusses negotiating with vendors when purchasing campus information technology. Describes the mechanics of a negotiation (deep discounts, maintenance and support costs, future discounts, warranties and remedies, training and consulting), vendor approaches to negotiating, composition of the negotiating team, and what to do after negotiations end.…
Want Superstar Teachers? Scout for Talent, and Recruit Like Crazy.
ERIC Educational Resources Information Center
Bateman, C. Fred
1986-01-01
A school can assemble a winning teaching team by taking lessons from sports talent recruitment programs. Schools should search for early talent and ask education professors to identify promising student teachers. Contracts should be offered immediately to final round draft choices. (CJH)
[Costs with personnel and productivity analysis of family health program teams in Fortaleza, Ceará].
Rocha Filho, Fernando dos Santos; da Silva, Marcelo Gurgel Carlos
2009-01-01
The research verified the productivity and the operational personnel costs of eight teams of the Family Health Program (PSF) of two Basic Units of Family Health (UBASF) in Fortaleza, Ceará, through the methodology of costs by absorption, in 2004. The largest expenses were with personnel (75%), mainly with the PSF teams, and medicines (18%). The federal allocations received in September, 2004, by each PSF team, were R$ 9,543.33. The total cost by team was R$ 15,719.00. Some professionals of various PSF teams showed productivity above the set objectives, but the average productivity by doctor and nurse was below fifty per cent of objectives, with high idle time making the work onerous. The unity cost of home visits by doctor and prenatal attendance by nurses were checked, and, would be less expensive if the idle time were reduced. Various alternatives of cost reduction were observed, such as scale savings of some resources and services and re-negotiation of contracts with suppliers and cooperatives. The data obtained will contribute to more accurate planning for the installation and maintenance of PSF teams as well as alternatives of cost reductions, higher productivity, and better quality.
Management Academy for Public Health: Creating Entrepreneurial Managers
Orton, Stephen; Umble, Karl; Zelt, Sue; Porter, Janet; Johnson, Jim
2007-01-01
The Management Academy for Public Health develops public health managers’ management skills. Ultimately, the program aims to develop civic entrepreneurs who can improve the efficiency and the effectiveness of their organizations. With help from a coach, teams write public health business plans to meet needs in their communities. An external evaluation found that 119 teams trained during the first 3 years of the program generated more than $6 million in enhanced revenue—including grants, contracts, and fees through their business plans—from $2 million in program funding. Approximately 38% of the teams expected to generate revenue from an academy business plan or a spin-off plan. Action-learning methods can help midcareer managers transfer their training to the workplace and build entrepreneurial skills. PMID:17329658
AREVA Team Develops Sump Strainer Blockage Solution for PWRs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phan, Ray
2006-07-01
The purpose of this paper is to discuss the methodology, testing challenges, and results of testing that a team of experts from Areva NP, Alden Research Laboratory, Inc (ALDEN), and Performance Contracting Inc. (PCI) has developed. The team is currently implementing a comprehensive solution to the issue of Emergency Core Cooling System (ECCS) sump strainer blockage facing Pressurized Water Reactor (PWR) Nuclear Plants. The team has successfully demonstrated two key results from the testing of passive Sure-FlowTM strainers, which were designed to distribute the required flow over a large surface area resulting in extremely low approach velocities. First, the actualmore » head loss (pressure drop) as tested, across the prototype strainers, was much lower than the calculated head loss using the Nuclear Regulatory Commission (NRC) approved NUREG/CR-6224 head loss correlation. Second, the penetration fractions were much lower than those seen in the NRC sponsored debris penetration tests. (author)« less
Collective Bargaining at Kent State University: Negotiating Team and Costs
ERIC Educational Resources Information Center
Charron, William J., Jr.; Plumley, Virginia
1978-01-01
Financial costs incurred by management at Kent State University in preparing and in negotiating its contract are discussed, including the cost of the administrative personnel responsible for negotiating and the assessment of other direct and indirect costs to management. Implementation costs are not included. (LBH)
76 FR 28925 - Tribal Veterans Cemetery Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-19
... means the process of site selection, land acquisition, design and planning, earth moving, landscaping... space, or functional layout; and it will not enter into a construction contract for the project or... State or Tribal Organization and the design team to provide a standard for preparation of drawings...
Exercise Design for the Joint Force 2020 Brigade Combat Team
2012-03-22
include within their calculus .41 With these factors in mind, in his February 2012 testimony before congress, General Dempsey stressed that the...moving the existing contracted ―civilian on the battlefield vehicle‖ (COBV) motor pool and maintenance facility, the post dental clinic, the dump
A Corporate Pitch for Athletics.
ERIC Educational Resources Information Center
Morrison, Steve
1998-01-01
The challenge of funding new athletic programs with no additional tax revenue forced a Colorado Springs school district to supplement existing funding arrangements (participation fees, gate admissions, and team fundraising) with a new income source--a lucrative Coca-Cola contract. This article explains how to negotiate (and justify) favorable…
Alternative Models for the ERIC Clearinghouse Network.
ERIC Educational Resources Information Center
Greenwood, P. W.; Weiler, D. M.
The National Center for Educational Communication (NCEC) contracted with Rand to develop a range of potential objectives and structures for the Educational Resources Information Center (ERIC) system that could render it more effective in the future. The Rand study team surveyed the scope and sources of education literature and studied the…
42 CFR 483.460 - Condition of participation: Health care services.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... Drugs and biologicals may be obtained from community or contract pharmacists or the facility may maintain a licensed pharmacy. (j) Standard: Drug regimen review. (1) A pharmacist with input from the interdisciplinary team must review the drug regimen of each client at least quarterly. (2) The pharmacist must...
42 CFR 483.460 - Condition of participation: Health care services.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... Drugs and biologicals may be obtained from community or contract pharmacists or the facility may maintain a licensed pharmacy. (j) Standard: Drug regimen review. (1) A pharmacist with input from the interdisciplinary team must review the drug regimen of each client at least quarterly. (2) The pharmacist must...
42 CFR 483.460 - Condition of participation: Health care services.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... Drugs and biologicals may be obtained from community or contract pharmacists or the facility may maintain a licensed pharmacy. (j) Standard: Drug regimen review. (1) A pharmacist with input from the interdisciplinary team must review the drug regimen of each client at least quarterly. (2) The pharmacist must...
42 CFR 483.460 - Condition of participation: Health care services.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... Drugs and biologicals may be obtained from community or contract pharmacists or the facility may maintain a licensed pharmacy. (j) Standard: Drug regimen review. (1) A pharmacist with input from the interdisciplinary team must review the drug regimen of each client at least quarterly. (2) The pharmacist must...
42 CFR 483.460 - Condition of participation: Health care services.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Drugs and biologicals may be obtained from community or contract pharmacists or the facility may maintain a licensed pharmacy. (j) Standard: Drug regimen review. (1) A pharmacist with input from the interdisciplinary team must review the drug regimen of each client at least quarterly. (2) The pharmacist must...
Applications of aerospace technology
NASA Technical Reports Server (NTRS)
Rouse, D. J.; Brown, J. N., Jr.; Cleland, John; Lehrman, Stephen; Trachtman, Lawrence; Wallace, Robert; Winfield, Daniel; Court, Nancy; Maggin, Bernard; Barnett, Reed
1987-01-01
Highlights are presented for the Research Triangle Institute (RTI) Applications Team activities over the past quarter. Progress in fulfilling the requirements of the contract is summarized, along with the status of the eight add-on tasks. New problem statements are presented. Transfer activities for ongoing projects with the NASA Centers are included.
48 CFR 810.001 - Market research policy.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Market research policy... COMPETITION AND ACQUISITION PLANNING MARKET RESEARCH 810.001 Market research policy. When conducting market research, VA contracting teams shall use the VIP database, at http://www.VetBiz.gov, in addition to other...
48 CFR 810.001 - Market research policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Market research policy... COMPETITION AND ACQUISITION PLANNING MARKET RESEARCH 810.001 Market research policy. When conducting market research, VA contracting teams shall use the VIP database, at http://www.VetBiz.gov, in addition to other...
48 CFR 810.001 - Market research policy.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Market research policy... COMPETITION AND ACQUISITION PLANNING MARKET RESEARCH 810.001 Market research policy. When conducting market research, VA contracting teams shall use the VIP database, at http://www.VetBiz.gov, in addition to other...
48 CFR 810.001 - Market research policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Market research policy... COMPETITION AND ACQUISITION PLANNING MARKET RESEARCH 810.001 Market research policy. When conducting market research, VA contracting teams shall use the VIP database, at http://www.VetBiz.gov, in addition to other...
Recovery Act Weekly Video: 200 West Drilling
None
2018-02-07
President of Cascade Drilling, Bruce, talks about his contract with the Department of Energy and what his team is doing to improve water treatment and environmental cleanup. The small business owner hits on how the Recovery Act saved him from downsizing and helped him stay competitive and safe on site.
The Influence of Noneconomic Factors on Negotiators
ERIC Educational Resources Information Center
Tracy, Lane
1974-01-01
Certain noneconomic factors in collective bargaining are directly related to the negotiator's personal inclination to settle for the new contract. In this study, the pattern of relationships between the parties, the nature of the work itself, favorable recognition, team policy, and interpersonal relationships proved to be significantly related to…
Iraq Reconstruction: Lessons Learned from Investigations, 2004-2012
2012-04-01
about 10 miles south of Baghdad, where Bloom supplied contracting offi cers with, in the words of one defendant, “women of the night, Cuban cigars ...Department of State Offi ce of Inspector General (DoS OIG) SPITFIRE investigative teams employed electronic databases and specialized forensic analysis to
General practitioners in partnership with management: an organisational model for debate.
Starey, N; Bosanquet, N; Griffiths, J
1993-01-01
The role of general practitioners is changing and expanding. Doctors have more control over the treatment received by their patients but remain largely unaccountable to the public and management. This article proposes an organisational model for integrating primary and secondary care which retains the advantages of fund-holding while giving management control over overall strategy. It proposes that general practitioners control funds for all primary and secondary care. Secondary care will be contracted through a joint team of managers and an elected general practice executive committee. A new health care purchasing authority will contract for primary services with individual practices or primary care provider units. General practitioners will have local contracts reflecting their desire to provide an expanded range of services and the needs of the community. PMID:8461651
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1998-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sproles, A.
1993-03-01
During summer 1992, the World Association of Nuclear Operators (WANO) sponsored an exchange visit between Georgia Power Company's Edwin I. Hatch nuclear plant, a two-unit boiling water reactor site, and the Smolensk atomic energy station, a three-unit RBMK (graphite-moderated and light-water-cooled) plant located 350 km west of Moscow, in Desnogorsk, Russia. The Plant Hatch team included Glenn Goode, manager of engineering support; Curtis Coggin, manager of training and emergency preparedness; Wayne Kirkley, manager of health physics and chemistry; John Lewis, manager of operations; Ray Baker, coordinator of nuclear fuels and contracts; and Bruce McLeod, manager of nuclear maintenance support. Alsomore » traveling with the team was Jerald Towgood, of WANO's Atlanta Centre. The Hatch team visited the Smolensk plant during the week of July 27, 1992.« less
Hiring an associate dean of academic affairs.
Pressler, Jana L; Kenner, Carole A
2009-01-01
Many new nursing leaders assuming deanships, assistant deanships, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Effecting change in striving to achieve capacity.
Pressler, Jana L; Kenner, Carole
2007-01-01
Many new nursing leaders assuming deanships and assistant or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Embracing new directions in curricula and teaching.
Pressler, Jana L; Kenner, Carole
2009-01-01
Many new nursing leaders assuming deanships or assistant or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Addressing the underperformance of faculty and staff.
Kenner, Carole; Pressler, Jana L
2006-01-01
Many new nursing leaders assuming work as deans, assistant deans, or interim deans have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, both deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
When does outsourcing become a right source for academic excellence?
Kenner, Carole; Pressler, Jana L
2006-01-01
Many new nursing leaders assuming deanships, assistant deanships, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Capitalizing on joint ventures to economize in nursing.
Pressler, Jana L; Kenner, Carole A
2010-01-01
Many new nursing leaders assuming deanships, assistant, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Starting small and early for research funding.
Pressler, Jana L; Kenner, Carole A
2009-01-01
Many new nursing leaders assuming deanships or assistant or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
The ripple effect: advancing faculty research?
Kenner, Carole; Pressler, Jana L
2008-01-01
Many new nursing leaders assuming deanships or assistant or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Performance evaluations and literacy.
Pressler, Jana L; Kenner, Carole A
2009-01-01
Many new nursing leaders assuming deanships or assistant or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department, 2 deans, offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Return on investment: an essential economics measure in higher education.
Pressler, Jana L; Kenner, Carole A
2014-01-01
Many new nursing leaders assuming deanships, assistant deanships, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, the authors of this department offer survival tips based on their personal experiences and insights. They address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. The authors welcome counterpoint discussions with readers.
Zebis, M K; Bencke, J; Andersen, L L; Alkjaer, T; Suetta, C; Mortensen, P; Kjaer, M; Aagaard, P
2011-12-01
In sports, like team handball, fatigue has been associated with an increased risk of anterior cruciate ligament (ACL) injury. While effects of fatigue on muscle function are commonly assessed during maximal isometric voluntary contraction (MVC), such measurements may not relate to the muscle function during match play. The purpose of this study was to investigate the effect of muscle fatigue induced by a simulated handball match on neuromuscular strategy during a functional sidecutting movement, associated with the incidence of ACL injury. Fourteen female team handball players were tested for neuromuscular activity [electromyography (EMG)] during a sidecutting maneuver on a force plate, pre and post a simulated handball match. MVC was obtained during maximal isometric quadriceps and hamstring contraction. The simulated handball match consisted of exercises mimicking handball match activity. Whereas the simulated handball match induced a decrease in MVC strength for both the quadriceps and hamstring muscles (P<0.05), a selective decrease in hamstring neuromuscular activity was seen during sidecutting (P<0.05). This study shows impaired ACL-agonist muscle (i.e. hamstring) activity during sidecutting in response to acute fatigue induced by handball match play. Thus, screening procedures should involve functional movements to reveal specific fatigue-induced deficits in ACL-agonist muscle activation during high-risk phases of match play. © 2010 John Wiley & Sons A/S.
Skills Conversion Project: Chapter 3, Food Products and Food Services Industry. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
The National Society of Professional Engineers, under contract to the Department of Labor, conducted a study to investigate the conversion of technical skills of displaced aerospace and defense professionals to other industries. The Seattle and Wichita study teams, focusing on the food industry, projected that about 200 employment opportunities…
Skills Conversion Project: Chapter 11, Banking, Finance and Insurance. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
The National Society of Professional Engineers, under contract to the U.S. Department of Labor, conducted a study to investigate the conversion of skills of displaced aerospace defense technical professional to other industries. The Long Island team of the study project investigated the banking, finance, and insurance industries. Approximately 250…
The Challenge of Doing Corporatized Research: An Ethnography of ICT Use
ERIC Educational Resources Information Center
Browning, Larry D.; Sornes, Jan-Oddvar
2008-01-01
Two team members from a four-person research project chronicle the power relations of their experiences during a 6-year study of information and communication technologies (ICTs), showing that employing bargaining techniques and framing the corporate support as a grant rather than as a contract can help one resist and even "manage…
Parents' Perspectives on Braille Literacy: Results from the ABC Braille Study
ERIC Educational Resources Information Center
Kamei-Hannan, Cheryl; Sacks, Sharon Zell
2012-01-01
Introduction: Parents who were the primary caretakers of children in the Alphabetic and Contracted Braille Study (ABC Braille Study) revealed their perspectives about braille literacy. Methods: A 30-item questionnaire was constructed by the ABC Braille research team, and researchers conducted telephone interviews with 31 parents who were the…
Summary of Research on Education and the Rural-Urban Transformation. Final Report.
ERIC Educational Resources Information Center
Textor, Robert B.; And Others
This monograph is the summary report of the "Education and the Rural-Urban Transformation" (ERUT) portion of the United States Office of Education research contract concerning "Content and Instructional Methods of Education for the Economic-Political-Social Development of Nations." The ERUT team conducted a continuing seminar throughout the…
MRI, Battelle and Bechtel to Manage National Renewable Energy Lab
Research Institute (MRI), Battelle Memorial Institute and Bechtel Corp. "We believe this new team had won the competition to manage and operate NREL for the next five years. The contract signing next five years, depending on congressional appropriations for renewable energy and energy efficiency
76 FR 77510 - Applications for New Awards; Small Business Innovation Research Program (SBIR)-Phase I
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-13
..., including projects leading to the manufacture of such items as artificial intelligence or information... obtain a copy of the application package in an accessible format (e.g., braille, large print, audiotape...., braille, large print, audiotape, or compact disc) by contacting the Grants and Contracts Services Team, U...
Managing logging residue under the timber sale contract.
Thomas C. Adams
1980-01-01
Management of logging residue is becoming an important part of timber sale planning. This involves controlling the amount of residue remaining on the ground and its distribution by diameter size class. Some residue is beneficial.An interdisciplinary team specified a desired residue level for one clearcutting unit of this trial. For comparison another cutting...
Technology Applications Team: Applications of aerospace technology
NASA Technical Reports Server (NTRS)
1993-01-01
Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.
Von Braun Rocket Team at Fort Bliss, Texas
NASA Technical Reports Server (NTRS)
1940-01-01
The German Rocket Team, also known as the Von Braun Rocket Team, poses for a group photograph at Fort Bliss, Texas. After World War II ended in 1945, Dr. Wernher von Braun led some 120 of his Peenemuende Colleagues, who developed the V-2 rocket for the German military during the War, to the United Sttes under a contract to the U.S. Army Corps as part of Operation Paperclip. During the following five years the team worked on high altitude firings of the captured V-2 rockets at the White Sands Missile Range in New Mexico, and a guided missile development unit at Fort Bliss, Texas. In April 1950, the group was transferred to the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal in Huntsville, Alabama, and continued to work on the development of the guided missiles for the U.S. Army until transferring to a newly established field center of the National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC).
1999-07-16
Morley Winograd (right), director of the National Partnership for Reinventing Government, presents the Hammer Award to Ed Gormel (left) and Chris Fairey (center) at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
1999-07-16
Ed Gormel (left) and Chris Fairey (center) accept the Hammer Award at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. Presenting the award is Morley Winograd (right), director of the National Partnership for Reinventing Government. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
Integrated Advanced Microwave Sounding Unit-A (AMSU-A)
NASA Technical Reports Server (NTRS)
Hauerwaas, R.
1998-01-01
This is the 69th Monthly Report for the Advanced Microwave Sounding Unit-A (EOS/AMSU-A), Contract NAS5-32314, and covers the period from 01 September through 30 September 1998. Included in this report are Combined Program Delivery Schedules and Reports (Section 2); a report from the Product Team Leaders on the status of all major program elements (Section 3); Contract Data Requirements List (CDRL) 503, the Weight and Power Budgets (Section 5); CDRL 204, reporting on the activities of Performance Assurance (Section 6); CDRL 203, the Configuration Management Status Report (Section 7); and the Document/Data Management Status Report (Section 8).
EBT Fidelity Trajectories Across Training Cohorts Using the Interagency Collaborative Team Strategy
Hecht, Debra; Aarons, Greg; Fettes, Danielle; Hurlburt, Michael; Ledesma, Karla
2015-01-01
The Interdisciplinary Collaborative Team (ICT) strategy uses front-line providers as adaptation, training and quality control agents for multi-agency EBT implementation. This study tests whether an ICT transmits fidelity to subsequent provider cohorts. SafeCare was implemented by home visitors from multiple community-based agencies contracting with child welfare. Client-reported fidelity trajectories for 5,769 visits, 957 clients and 45 providers were compared using three-level growth models. Provider cohorts trained and live-coached by the ICT attained benchmark fidelity after 12 weeks, and this was sustained. Hispanic clients reported high cultural competency, supporting a cultural adaptation crafted by the ICT. PMID:25586878
EBT Fidelity Trajectories Across Training Cohorts Using the Interagency Collaborative Team Strategy.
Chaffin, Mark; Hecht, Debra; Aarons, Greg; Fettes, Danielle; Hurlburt, Michael; Ledesma, Karla
2016-03-01
The Interdisciplinary Collaborative Team (ICT) strategy uses front-line providers as adaptation, training and quality control agents for multi-agency EBT implementation. This study tests whether an ICT transmits fidelity to subsequent provider cohorts. SafeCare was implemented by home visitors from multiple community-based agencies contracting with child welfare. Client-reported fidelity trajectories for 5,769 visits, 957 clients and 45 providers were compared using three-level growth models. Provider cohorts trained and live-coached by the ICT attained benchmark fidelity after 12 weeks, and this was sustained. Hispanic clients reported high cultural competency, supporting a cultural adaptation crafted by the ICT.
Three archives of the U. S. Geological Survey's Western Mineral Resources Team
Bolm, Karen Sue; Frank, David G.; Schneider, Jill L.
2000-01-01
The Western Mineral Resources Team of the U.S. Geological Survey (USGS) has three archives, which hold unpublished or difficult-to-obtain records and literature. The Technical Data Unit in Anchorage, Alaska, holds maps, field notes, and other records of the USGS work in Alaska. The USGS Field Office in Spokane, Washington, houses the more than 5,000 files from Federal government exploration programs that contracted to fund exploration for some commodities from 1950 until 1974. The Latin American Archive in Tucson, Arizona, holds material on Latin American mineral resources collected by the Center for Inter-American MineralResources Investigations.
Farmer, Jane; West, Christina; Whyte, Bruce; Maclean, Margaret
2005-08-01
It is acknowledged, internationally, that health-care practitioners' work differs between and urban areas. While several factors affect individual teams' activities, there is little understanding about how patterns of work evolve. Consideration of work in relation to local circumstances is important for training, devising contracts and redesigning services. Six case studies centred on Scottish rural and urban general practices were used to examine, in-depth, the activity of primary health-care teams. Quantitative workload data about patient contacts were collected over 24 months. Interviews and diaries revealed insightful qualitative data. Findings revealed that rural general practitioners and district nurses tended to conduct more consultations per practice patient compared with their urban counterparts. Conditions seen and work tasks varied between case study teams. Qualitative data suggested that the key reasons for variation were: local needs and circumstances; choices made about deployment of available time, team composition and the extent of access to other services. Primary care teams might be viewed as adaptive organization, with co-evolution of services produced by health professionals and local people. The study highlights limitations in the application of workload data and suggests that understanding the nature of work in relation to local circumstances is important in service redesign.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scheib, J.; Pless, S.; Torcellini, P.
NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... discussions prior to award for source selections of procurements estimated at $100 million or more. DATES... 24, 2010, to implement the recommendation of the DoD Source Selection Joint Analysis Team (JAT) to... negative effects, such as added Government and industry cost due to the significant increase in the source...
2016-04-29
Simulation of Spacecraft Electric Propulsion Systems and Plasma Spacecraft Environment 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Assessment of Capabilities for First‐ Principles Simulation of Spacecraft Electric Propulsion Systems and Plasma Spacecraft Environment” Team leader(s
An Analysis of Category Management of Service Contracts
2017-12-01
management teams a way to make informed , data-driven decisions. Data-driven decisions derived from clustering not only align with Category...savings. Furthermore, this methodology provides a data-driven visualization to inform sound business decisions on potential Category Management ...Category Management initiatives. The Maptitude software will allow future research to collect data and develop visualizations to inform Category
Developing Communities of Practice around e-Learning and Project Management
ERIC Educational Resources Information Center
Laxton, Ruth; Applebee, Andrelyn Cheryl
2010-01-01
In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…
Identifying and Overcoming Barriers to Diabetes Management in the Elderly: An Intervention Study
2008-06-01
11 4 Introduction: Subject: Research regarding older adults and, in particular, those with diabetes, lags far...research: In this study, patients over age 70 with diabetes will be randomized to care by either geriatric diabetes intervention team (GDT) or attention...Diabetes Management in the Elderly : An Intervention Study PRINCIPAL INVESTIGATOR: Medha Munshi CONTRACTING
Impact of the Federal School-Based Student Mentoring Program. NCEE Evaluation Brief. NCEE 2009-4074
ERIC Educational Resources Information Center
National Center for Education Evaluation and Regional Assistance, 2009
2009-01-01
The Office of Management and Budget requested that the Institute of Education Sciences (IES) oversee an independent impact evaluation of the federal Student Mentoring Program, and in 2005 IES contracted with Abt Associates and its team of subcontractors (Branch Associates, Moore and Associates, and the Center for Resource Management) to conduct…
Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress
2016-09-09
5 Lockheed Martin Files Protest with the Government Accountability Office (GAO...12, 2008, protests were filed with the Government Accountability Office (GAO) against the TD contract awards by the Northrop Grumman-Oshkosh team...Quantities and Program Costs13 According to the Government Accountability Agency’s (GAO’s) March 2016 Assessments of Major Weapons Programs, for a JLTV
Decision Tree Phytoremediation
1999-12-01
aromatic hydrocarbons, and landfill leachates . Phytoremediation has been used for point and nonpoint source hazardous waste control. 1.2 Types of... Phytoremediation Prepared by Interstate Technology and Regulatory Cooperation Work Group Phytoremediation Work Team December 1999 Decision Tree...1999 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Phytoremediation Decision Tree 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c
The Knowledge Stealing Initiative?
NASA Technical Reports Server (NTRS)
Goshorn, Larry
2005-01-01
I have the honor of being on the Academy of Program and Project Leadership (APPL) Knowledge Sharing Feedback and Assessment Team (FAA), and as such, I am privileged to receive the feedback written by many of you as attendees of the Project Management (PM) Master s Forums. It is the intent of the FAA Team and APPL leadership to use this feedback as a tool for continuous program improvement. As a retired (sort of) PM in the payload contracting industry, I'm a big supporter of NASA s Knowledge Sharing Initiative (KSI), especially the Master's Forums. I really enjoy participating in them. Unfortunately I had to miss the 8th forum in Pasadena this past Spring, but I did get the feedback package for the Assessment Team work. So here I was, reviewing twelve pages of comments, reflections, learning notes and critiques from attendees of the 8th forum.
1999-07-16
Commander of the Air Force Space Command, General Richard B. Myers (left) joins Ed Gormel (center) and Commander of the 45th Space Wing Brig. Gen. F. Randall Starbuck (right) after the presentation of the Hammer Award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. Morley Winograd, director of the National Partnership for Reinventing Government, presented the award to the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel is a co-chair of the SEB. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the J-BOSC SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
Coordinating teams of autonomous vehicles: an architectural perspective
NASA Astrophysics Data System (ADS)
Czichon, Cary; Peterson, Robert W.; Mettala, Erik G.; Vondrak, Ivo
2005-05-01
In defense-related robotics research, a mission level integration gap exists between mission tasks (tactical) performed by ground, sea, or air applications and elementary behaviors enacted by processing, communications, sensors, and weaponry resources (platform specific). The gap spans ensemble (heterogeneous team) behaviors, automatic MOE/MOP tracking, and tactical task modeling/simulation for virtual and mixed teams comprised of robotic and human combatants. This study surveys robotic system architectures, compares approaches for navigating problem/state spaces by autonomous systems, describes an architecture for an integrated, repository-based modeling, simulation, and execution environment, and outlines a multi-tiered scheme for robotic behavior components that is agent-based, platform-independent, and extendable via plug-ins. Tools for this integrated environment, along with a distributed agent framework for collaborative task performance are being developed by a U.S. Army funded SBIR project (RDECOM Contract N61339-04-C-0005).
1999-07-16
At a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, KSC and 45th Space Wing employees share the honors as recipients of the Hammer Award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. Morley Winograd, director of the National Partnership for Reinventing Government, presented the award to Ed Gormel and Chris Fairey, co-chairs of the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the J-BOSC SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
The Hammer Award is presented to KSC and 45th Space Wing.
NASA Technical Reports Server (NTRS)
1999-01-01
At a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, KSC and 45th Space Wing employees share the honors as recipients of the Hammer Award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. Morley Winograd, director of the National Partnership for Reinventing Government, presented the award to Ed Gormel and Chris Fairey, co-chairs of the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the J-BOSC SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base.
1999-07-16
KSC's Director of Public Affairs Joe Gordon (left) applauds as Ed Gormel and Chris Fairey are named recipients of the Hammer Award at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. Presenting the award is Morley Winograd (at the podium), director of the National Partnership for Reinventing Government. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
The Hammer Award is presented to KSC and 45th Space Wing.
NASA Technical Reports Server (NTRS)
1999-01-01
Commander of the Air Force Space Command, General Richard B. Myers (left) joins Ed Gormel (center) and Commander of the 45th Space Wing Brig. Gen. F. Randall Starbuck (right) after the presentation of the Hammer Award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. Morley Winograd, director of the National Partnership for Reinventing Government, presented the award to the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel is a co-chair of the SEB. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the J-BOSC SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base.
The Rosetta Science Archive: Status and Plans for Completing and Enhancing the Archive Content
NASA Astrophysics Data System (ADS)
Heather, D.; Barthelemy, M.; Fraga, D.; Grotheer, E.; O'Rourke, L.; Taylor, M.
2017-09-01
On 30 September 2016, Rosetta's signal flat-lined, confirming that the spacecraft had completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still on-going with instrument teams preparing their final science data increments for delivery and ingestion into ESA's Planetary Science Archive (PSA). In addition to this, ESA is establishing contracts with a number of instrument teams to enhance and improve their data and documentation in an effort to provide the best long- term archive possible for the Rosetta mission. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned and underway with the various instrument teams on Rosetta to ensure the scientific legacy of the mission.
A Status Report on the Parachute Development for NASA's Next Manned Spacecraft
NASA Technical Reports Server (NTRS)
Sinclair, Robert
2008-01-01
NASA has determined that the parachute portion of the Landing System for the Crew Exploration Vehicle (CEV) will be Government Furnished Equipment (GFE). The Earth Landing System has been designated CEV Parachute Assembly System (CPAS). Thus a program team was developed consisting of NASA Johnson Space Center (JSC) and Jacobs Engineering through their Engineering and Science Contract Group (ESCG). Following a rigorous competitive phase, Airborne Systems North America was selected to provide the parachute design, testing and manufacturing role to support this team. The development program has begun with some early flight testing of a Generation 1 parachute system. Future testing will continue to refine the design and complete a qualification phase prior to manned flight of the spacecraft. The program team will also support early spacecraft system testing, including a Pad Abort Flight Test in the Fall of 2008
1999-07-16
Ed Gormel (left) and Chris Fairey (center) display the Hammer Award they received at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. At the podium is Morley Winograd director of the National Partnership for Reinventing Government, who presented the award. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Fairey and Gormel are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
2013-01-17
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, Jacobs Technology General Manager Andy Allen speaks at a town hall meeting providing attendees an opportunity to learn about the Test and Operations Support Contract, or TOSC, hiring process and to introduce the organization's management team. NASA recently awarded its TOSC contract to Jacobs Technology Inc. of Tullahoma, Tenn. Jacobs will provide overall management and implementation of ground systems capabilities, flight hardware processing and launch operations at Kennedy. These tasks will support the International Space Station, Ground Systems Development and Operations, and the Space Launch System, Orion Multi-Purpose Crew Vehicle and Launch Services programs. For more information, visit http://www.nasa.gov/centers/kennedy/news/tosc_awarded.html Photo credit: NASA/Dimitri Gerondidakis
Utility photovoltaic group: Status report
NASA Astrophysics Data System (ADS)
Serfass, Jeffrey A.; Hester, Stephen L.; Wills, Bethany N.
1996-01-01
The Utility PhotoVoltaic Group (UPVG) was formed in October of 1992 with a mission to accelerate the use of cost-effective small-scale and emerging grid-connected applications of photovoltaics for the benefit of electric utilities and their customers. The UPVG is now implementing a program to install up to 50 megawatts of photovoltaics in small-scale and grid-connected applications. This program, called TEAM-UP, is a partnership of the U.S. electric utility industry and the U.S. Department of Energy to help develop utility PV markets. TEAM-UP is a utility-directed program to significantly increase utility PV experience by promoting installations of utility PV systems. Two primary program areas are proposed for TEAM-UP: (1) Small-Scale Applications (SSA)—an initiative to aggregate utility purchases of small-scale, grid-independent applications; and (2) Grid-Connected Applications (GCA)—an initiative to identify and competitively award cost-sharing contracts for grid-connected PV systems with high market growth potential, or collective purchase programs involving multiple buyers. This paper describes these programs and outlines the schedule, the procurement status, and the results of the TEAM-UP process.
21ST Century Manufacturing Enterprise Strategy Report
1992-01-01
national effort, but they must pursue it. The first choice feeds a number of American stereotypes championing self-sufficiency, but, in truth , it is...15.192 1992 Contract N00014-91-C-0150 Prepared for the Pubbe Office of Naval Research Arlington, VA 92i :6 \\592-27042Q CONTENTS ABSTRACT...3] 3. Approach ...................................................... [ 4] 3.1. Formation of the Inner Core Team
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
2014-06-01
Specialists (43X/44X/45X) Chaplain (52R) Civil Engineer (32E) Combat Air Force Contracting (64P) Cyber Operations (17D) Dental (47X) Finance (65 F...assume the principal has a perfect decision making calculus . The MAF DT may actually have asymmetric information, and given the opportunity, they could
Information Protection Engineering: Using Technology and Experience to Protect Assets
2001-07-01
SAIC’s highly experienced team has developed technology, techniques and expertise in protecting these information assets from electronic attack by...criminals, terrorists, hackers or nation states. INFORMATION PROTECTION ENGINEERING : Using Technology and Experience to Protect Assets William J. Marlow... Engineering : Using Technology and Experience to Protect Assets Contract or Grant Number Program Element Number Authors Marlow, William J. Project
2015-02-01
Landpower in an Uncertain Strategic Environment, June 1-3, 2014 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...3: THE ARMY AS PART OF THE JOINT, INTERAGENCY, AND INTERGOVERNMENTAL TEAM Panelists: Lieutenant General Edward Cardon , Commander, U.S. Army
MV-22 Squadron Organization: A Different Way to Support
2017-06-09
acquisitions process, contractors have become an integral part in the support of daily MV-22...perform. MCAS New River has several teams of contract maintainers that are sent to individual squadrons on a daily basis.6 As the need for contractors ...has increased, more jobs have become available to qualified maintainers. This actually increases the need for even more contractors , as qualified
Technology and Economics, Inc. Technology Application Team
NASA Technical Reports Server (NTRS)
Ballard, T.; Macfadyen, D. J.
1981-01-01
Technology + Economics, Inc. (T+E), under contract to the NASA Headquarters Technology Transfer Division, operates a Technology Applications Team (TATeam) to assist in the transfer of NASA-developed aerospace technology. T+E's specific areas of interest are selected urban needs at the local, county, and state levels. T+E contacts users and user agencies at the local, state, and county levels to assist in identifying significant urban needs amenable to potential applications of aerospace technology. Once viable urban needs have been identified in this manner, or through independent research, T+E searches the NASA technology database for technology and/or expertise applicable to the problem. Activities currently under way concerning potential aerospace applications are discussed.
NASA Technical Reports Server (NTRS)
Entin, Elliot E.; Kerrigan, Caroline; Serfaty, Daniel; Young, Philip
1998-01-01
The goals of this project were to identify and investigate aspects of team and individual decision-making and risk-taking behaviors hypothesized to be most affected by prolonged isolation. A key premise driving our research approach is that effects of stressors that impact individual and team cognitive processes in an isolated, confined, and hazardous environment will be projected onto the performance of a simulation task. To elicit and investigate these team behaviors we developed a search and rescue task concept as a scenario domain that would be relevant for isolated crews. We modified the Distributed Dynamic Decision-making (DDD) simulator, a platform that has been extensively used for empirical research in team processes and taskwork performance, to portray the features of a search and rescue scenario and present the task components incorporated into that scenario. The resulting software is called DD-Search and Rescue (Version 1.0). To support the use of the DDD-Search and Rescue simulator in isolated experiment settings, we wrote a player's manual for teaching team members to operate the simulator and play the scenario. We then developed a research design and experiment plan that would allow quantitative measures of individual and team decision making skills using the DDD-Search and Rescue simulator as the experiment platform. A description of these activities and the associated materials that were produced under this contract are contained in this report.
Scientific Data Analysis and Software Support: Geodynamics
NASA Technical Reports Server (NTRS)
Klosko, Steven; Sanchez, B. (Technical Monitor)
2000-01-01
The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.
Marginal-cost contracting in the NHS: results of a preliminary survey.
Beddow, A J; Cohen, D R
2001-05-01
Market disciplines and incentives were expected to improve efficiency in the UK National Health Service following the introduction of an 'internal market' in 1991. An exploratory survey of all Health Authorities and Trusts in the UK was undertaken to investigate whether players in the NHS managed market are behaving as economic theory predicts they should. The focus was on how and to what extent marginal costing has been used in the contracting process and on whether in some instances an inappropriate use of marginal costing may be resulting in inappropriate investment decisions. Twenty of 29 responding Health Authorities (69%) and 16 of 39 Trusts (41%) stated that they had considered purchasing/providing services on a marginal-cost basis and all of these led to contracts. Marginal-cost contracting appears to be fairly commonplace and the process does not appear to be causing insurmountable conflicts between players. Most marginal-cost contracts were specifically to meet waiting-list initiative targets. Overall results suggest that economic principles are not being particularly adhered to, with expansion in output rarely being related to available capacity. As increased responsibility for commissioning passes to primary care teams and local health groups, there are lessons for those involved in this more disaggregated approach to service shaping and service delivery.
Boarding Team Communications Phase I: Product Development and Evaluation
2007-05-01
U.S. Coast Guard Research and Development Center 1082 Shennecossett Road, Groton, CT 06340-6048 Report No. CG-D-04-2007 Template: Report Cover...Technical Director United States Coast Guard Research & Development Center 1082 Shennecossett Road Groton, CT 06340-6048 Template...Research and Development Center 11. Contract or Grant No. 1082 Shennecossett Road Fairfax, VA 22030 Groton, CT 06340-6048 13. Type of
NASA Technical Reports Server (NTRS)
1989-01-01
The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.
Right Time, Right Place: Building an Online Learning Community for Afterschool Practitioners
ERIC Educational Resources Information Center
Balow, Nancy; Benard, Bonnie; Hipps, Jerry; Lauver, Sherri; McManus, John; Montgomery, Robert; Truebridge, Sara; Vitale, Alfred; Walker, Roy
2010-01-01
In 2008, the U.S. Department of Education awarded a contract to a team of education, youth development, and web development specialists to develop an online professional learning community for grantees in the 21st Century Community Learning Centers (21st CCLC). The online community, You for Youth (Y4Y, www.Y4Y.ed.gov) will support afterschool…
2010-06-01
Online Shopping Tool • Web self-service capability for the DOD • Sells both finished goods and services • Supports contracts written by DLA, GSA...month and over 750K items of content a month • FY08 Total Sales $835M; Green Sales $7.3M 11 DOD EMALL DOD’s Online Shopping Tool 1st Choice Support for
2009-06-12
disease to name but a few. With every challenge, however, there exist just as many opportunities to enhance strategic partnership, provide...and disease to name but a few. With every challenge, however, there exist just as many opportunities to enhance strategic partnership, provide...Policy Coordination Committee PCO Project Contracting Office PCRU Post-Conflict Reconstruction Unit PME Professional Military Education PMESII
Developing Tomorrows Space War Fighter: The Argument for Contracting Out Satellite Operations
2015-12-01
intelligence agencies to operate in a de- nied or degraded space environment through focused education, training, and exercises and through new doctrine...Integrated Defending space will be a team effort that will involve contributions of the intelligence community, commercial partners, and allied...Operations We will build a more diverse and balanced workforce among military, civilian, and contractor components. These professionals must be educated
A Study of Placing Army Requirements on Contract
2016-04-01
perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011
Immersive Learning Technologies
2009-08-20
Immersive Learning Technologies Mr. Peter Smith Lead, ADL Immersive Learning Team 08/20/2009 Report Documentation Page Form ApprovedOMB No. 0704...to 00-00-2009 4. TITLE AND SUBTITLE Immersive Learning Technologies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR...unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 Why Immersive Learning Technologies
Integrated Advanced Microwave Sounding Unit-A (AMSU-A): Monthly Report for August
NASA Technical Reports Server (NTRS)
Nieto, A.
2000-01-01
Included in this report are Combined Program Delivery Schedules and Reports; a report from the Product Team Leaders on the status of all major program elements; Contract Data Requirements List (CDRL) 503, the Weight and Power Budgets; CDRL 204, reporting on the activities of Performance Assurance; CDRL 203, the Configuration Management Status Report; and the Documentation/Data Management Status Report.
Australian Naval Procurement Cycles: Lessons for Other Small Countries
2008-04-23
56), the project was “Australia’s most ambitious and technically advanced defence project ever” ( McIntosh & Prescott, 1999, p. 5...platform in the single prime contract, with a unique military specification, Defence left itself widen open to […] technological problems” ( McIntosh ...shipbuilding facility in Mobile, Alabama . From this foothold in the US shipbuilding market Austal operates as part of the General Dynamics team building
Building trust and diversity in patient-centered oncology clinical trials: An integrated model.
Hurd, Thelma C; Kaplan, Charles D; Cook, Elise D; Chilton, Janice A; Lytton, Jay S; Hawk, Ernest T; Jones, Lovell A
2017-04-01
Trust is the cornerstone of clinical trial recruitment and retention. Efforts to decrease barriers and increase clinical trial participation among diverse populations have yielded modest results. There is an urgent need to better understand the complex interactions between trust and clinical trial participation. The process of trust-building has been a focus of intense research in the business community. Yet, little has been published about trust in oncology clinical trials or the process of building trust in clinical trials. Both clinical trials and business share common dimensions. Business strategies for building trust may be transferable to the clinical trial setting. This study was conducted to understand and utilize contemporary thinking about building trust to develop an Integrated Model of Trust that incorporates both clinical and business perspectives. A key word-directed literature search of the PubMed, Medline, Cochrane, and Google Search databases for entries dated between 1 January 1985 and 1 September 2015 was conducted to obtain information from which to develop an Integrated Model of Trust. Successful trial participation requires both participants and clinical trial team members to build distinctly different types of interpersonal trust to effect recruitment and retention. They are built under conditions of significant emotional stress and time constraints among people who do not know each other and have never worked together before. Swift Trust and Traditional Trust are sequentially built during the clinical trial process. Swift trust operates during the recruitment and very early active treatment phases of the clinical trial process. Traditional trust is built over time and operates during the active treatment and surveillance stages of clinical trials. The Psychological Contract frames the participants' and clinical trial team members' interpersonal trust relationship. The "terms" of interpersonal trust are negotiated through the psychological contract. Contract renegotiation occurs in response to cyclical changes within the trust relationship throughout trial participation. The Integrated Model of Trust offers a novel framework to interrogate the process by which diverse populations and clinical trial teams build trust. To our knowledge, this is the first model of trust-building in clinical trials that frames trust development through integrated clinical and business perspectives. By focusing on the process, rather than outcomes of trust-building diverse trial participants, clinical trials teams, participants, and cancer centers may be able to better understand, measure, and manage their trust relationships in real time. Ultimately, this may foster increased recruitment and retention of diverse populations to clinical trials.
Writing a job description/contract for a dental hygienist in dental practice.
Blair, D J
1997-01-01
THE JOB DESCRIPTION: Describes how the dentist wants to use that person in the practice, adapted by communication and the resourcefulness of the employee. A hygienist is trained with a particular philosophy. The practice philosophy is generally something that has developed without the help of the hygienist's philosophy, but none the less both need active manipulation and respect. The job description described here has changed rapidly and will continue to evolve as we communicate, educate and change to try to improve our overall service and delivery. THE CONTRACT: Now that an understanding has been reached as to both hygienist's's and dentist expectations, a contract for employment is required. The Employment Act in New Zealand has determined that this is essential. It is difficult to determine a contract without the job description. A contract should have a time-frame and be concise. It should be firm and binding whereas the job description should be flexible. The contract should have a clause which takes account of the flexibility and developing nature of the job description. The job description can be a baseline not only for the hygienist, but for the communication necessary to develop and improve team systems and programmes. The contract and its renewal is just one of those systems. The changes to a contract can only occur on renewal, but this doesn't mean to say you can't both tear it up and start again. The rapid changes that occur in modern dentistry cannot all be accounted for and there will always be the missing clauses. Your teamwork and communication will reduce these, and help promote a more satisfactory, comfortable and less stressful work environment.
2013-01-17
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, Jacobs Technology Deputy General Manager Lorna Kenna speaks at a town hall meeting providing attendees an opportunity to learn about the Test and Operations Support Contract, or TOSC, hiring process and to introduce the organization's management team. NASA recently awarded its TOSC contract to Jacobs Technology Inc. of Tullahoma, Tenn. Jacobs will provide overall management and implementation of ground systems capabilities, flight hardware processing and launch operations at Kennedy. These tasks will support the International Space Station, Ground Systems Development and Operations, and the Space Launch System, Orion Multi-Purpose Crew Vehicle and Launch Services programs. For more information, visit http://www.nasa.gov/centers/kennedy/news/tosc_awarded.html Photo credit: NASA/Dimitri Gerondidakis
Thompson, Cesarina M
2011-01-01
Many new nursing leaders assuming deanships, assistant, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, Jana L. Pressler, PhD, RN, and Carole A. Kenner, PhD, RNC-NIC, FAAN, the editors of this department, address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. In this article, the editors asked guest author, Dr Cesarina Thompson, to discuss the transition process from faculty to administrative role.
Impact of a Hurricane Shelter Viral Gastroenteritis Outbreak on a Responding Medical Team.
Gaither, Joshua B; Page, Rianne; Prather, Caren; Paavola, Fred; Garrett, Andrew L
2015-08-01
Introduction In late October of 2012, Hurricane Sandy struck the northeast United States and shelters were established throughout the impacted region. Numerous cases of infectious viral gastroenteritis occurred in several of these shelters. Such outbreaks are common and have been well described in the past. Early monitoring for, and recognition of, the outbreak allowed for implementation of aggressive infection control measures. However, these measures required intensive medical response team involvement. Little is known about how such outbreaks affect the medical teams responding to the incident. Hypothesis/Problem Describe the impact of an infectious viral gastroenteritis outbreak within a single shelter on a responding medical team. The number of individuals staying in the single shelter each night (as determined by shelter staff) and the number of patients treated for symptoms of viral gastroenteritis were recorded each day. On return from deployment, members of a single responding medical team were surveyed to determine how many team members became ill during, or immediately following, their deployment. The shelter population peaked on November 5, 2012 with 811 individuals sleeping in the shelter. The first patients presented to the shelter clinic with symptoms of viral gastroenteritis on November 4, 2012, and the last case was seen on November 21, 2012. A total of 64 patients were treated for nausea, vomiting, or diarrhea over the 17-day period. A post-deployment survey was sent to 66 deployed medical team members and 45 completed the survey. Twelve (26.7%) of the team members who responded to the survey experienced symptoms of probable viral gastroenteritis. Team members reported onset of symptoms during deployment as well as after returning home. Symptoms started on days 4-8, 8-14, on the trip home, and after returning home in four, four, two, and two team members, respectively. Medical teams providing shelter care during viral gastroenteritis outbreaks are susceptible to contracting the virus while caring for patients. When responding to similar incidents in the future, teams should not only be ready to implement aggressive infectious control measures but also be prepared to care for team members who become ill.
The Hammer Award is presented to KSC and 45th Space Wing.
NASA Technical Reports Server (NTRS)
1999-01-01
KSC's Director of Public Affairs Joe Gordon (left) applauds as Ed Gormel and Chris Fairey are named recipients of the Hammer Award at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. Presenting the award is Morley Winograd (at the podium), director of the National Partnership for Reinventing Government. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base.
1999-07-16
At a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, the Hammer Award is presented to Kennedy Space Center and the 45th Space Wing. Present for the awards are (left to right) Commander of the Air Force Space Command General Richard B. Myers, Ed Gormel, Chris Fairey, NASA Administrator Daniel Goldin, and Director of the National Partnership for Reinventing Government, Morley Winograd, who presented the award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
Origin of Marshall Space Flight Center (MSFC)
1940-01-01
The German Rocket Team, also known as the Von Braun Rocket Team, poses for a group photograph at Fort Bliss, Texas. After World War II ended in 1945, Dr. Wernher von Braun led some 120 of his Peenemuende Colleagues, who developed the V-2 rocket for the German military during the War, to the United Sttes under a contract to the U.S. Army Corps as part of Operation Paperclip. During the following five years the team worked on high altitude firings of the captured V-2 rockets at the White Sands Missile Range in New Mexico, and a guided missile development unit at Fort Bliss, Texas. In April 1950, the group was transferred to the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal in Huntsville, Alabama, and continued to work on the development of the guided missiles for the U.S. Army until transferring to a newly established field center of the National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC).
Slush Hydrogen Technology Program
NASA Technical Reports Server (NTRS)
Cady, Edwin C.
1994-01-01
A slush hydrogen (SH2) technology facility (STF) was designed, fabricated, and assembled by a contractor team of McDonnell Douglas Aerospace (MDA), Martin Marietta Aerospace Group (MMAG), and Air Products and Chemicals, Inc. (APCI). The STF consists of a slush generator which uses the freeze-thaw production process, a vacuum subsystem, a test tank which simulates the NASP vehicle, a triple point hydrogen receiver tank, a transfer subsystem, a sample bottle, a pressurization system, and a complete instrumentation and control subsystem. The STF was fabricated, checked-out, and made ready for testing under this contract. The actual SH2 testing was performed under the NASP consortium following NASP teaming. Pre-STF testing verified SH2 production methods, validated special SH2 instrumentation, and performed limited SH2 pressurization and expulsion tests which demonstrated the need for gaseous helium pre-pressurized of SH2 to control pressure collapse. The STF represents cutting-edge technology development by an effective Government-Industry team under very tight cost and schedule constraints.
Developing Capture Mechanisms and High-Fidelity Dynamic Models for the MXER Tether System
NASA Technical Reports Server (NTRS)
Canfield, Steven L.
2007-01-01
A team consisting of collaborators from Tennessee Technological University (TTU), Marshall Space Flight Center, BD Systems, and the University of Delaware (herein called the TTU team) conducted specific research and development activities in MXER tether systems during the base period of May 15, 2004 through September 30, 2006 under contract number NNM04AB13C. The team addressed two primary topics related to the MXER tether system: 1) Development of validated high-fidelity dynamic models of an elastic rotating tether and 2) development of feasible mechanisms to enable reliable rendezvous and capture. This contractor report will describe in detail the activities that were performed during the base period of this cycle-2 MXER tether activity and will summarize the results of this funded activity. The primary deliverables of this project were the quad trap, a robust capture mechanism proposed, developed, tested, and demonstrated with a high degree of feasibility and the detailed development of a validated high-fidelity elastic tether dynamic model provided through multiple formulations.
Cost and Schedule Analytical Techniques Development: Option 2 Year
NASA Technical Reports Server (NTRS)
1997-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.
Vainieri, Milena; Smaldone, Pierluigi; Rosa, Antonella; Carroll, Kathleen
2017-08-23
The role played by remuneration strategies in motivating health care professionals is one of the most studied factors. Some studies of nursing home (NH) services, while considering wages and labor market characteristics, do not explicitly account for the influence of the contract itself. This study investigates the relationship between the labor contracts applied in 62 Tuscan NHs and NH aides' job satisfaction with two aims: to investigate the impact of European contracts on employee satisfaction in health care services and to determine possible limitations of research not incorporating these contracts. We apply a multilevel model to data gathered from a staff survey administered in 2014 to all employees of 62 NHs to analyze two levels: individual and NH. Labor contracts were introduced into the model as a variable of NH. Findings show that the factors influencing nursing aides' satisfaction occur at both the individual and NH levels. Organizational characteristics explain 16% of the variation. For individual characteristics, foreign and temporary workers emerge as more satisfied than others. For NH variables, results indicate that the labor contract with the worst conditions is not associated with lower workers' satisfaction. Although working conditions play a relevant role in the job satisfaction of aides, labor contracts do not seem to affect it. Interestingly, aides of the NHs with the contract having the best conditions register a significantly lower level of satisfaction compared to the NHs with the worst contract conditions. This suggests that organizational factors such as culture, team work, and other characteristics, which were not explicitly considered in this study, may be more powerful sources of worker satisfaction than labor contracts. Our analysis has value as a management tool to consider alternative sources as well as the labor contract for employee incentives.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited. The work cannot be changed in any way or used commercially without permission from the journal.
2011-03-01
performance of Federal Government Contract Number FA8721-05- C -0003 with Carnegie Mellon University for the operation of the Software Engineering... C Roles and Responsibilities 195 Appendix D Reporting Requirements and Options 201 Appendix E Managed Discovery 203 Appendix F Scoping and...Upgrade Team (SUT) • Mary Busby , Lockheed Martin • Palma Buttles-Valdez, Software Engineering Institute • Paul Byrnes, Integrated System Diagnostics
2013-08-01
activities worldwide and industry customers of DLA. Contents of this publication are not necessarily the official views of, or endorsed by, the U.S...100 million for three months straight June • MRAP Stock Optimization Team established to maintain industrial readiness between the joint program ...SUBTITLE Loglines. July-August 2013 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK
Biomarkers for Pulmonary Injury Following Deployment
2013-02-01
Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No...methods, please refer to the 2012 Annual Report for this contract. Rat BALF samples were denatured, digested, and desalted prior to liquid chromatography...that were part of the dust instillation studies designed by USACHER and carried out by a team at NIOSH. These samples were obtained both from a first
Commercial Mobile Alert Service (CMAS) Scenarios
2012-05-01
Commercial Mobile Alert Service (CMAS) Scenarios The WEA Project Team May 2012 SPECIAL REPORT CMU/SEI-2012-SR-020 CERT® Division, Software ...Homeland Security under Contract No. FA8721-05-C-0003 with Carnegie Mellon University for the operation of the Software Engineering Institute, a federally...DISTRIBUTES IT “AS IS.” References herein to any specific commercial product, process, or service by trade name, trade mark, manufacturer, or otherwise
Earth Science Instruction Using Brownfields in the Virtual Classroom
NASA Astrophysics Data System (ADS)
Bower, P. M.; Liddicoat, J. C.
2008-05-01
Geophysical methods of defining contaminant plumes from brownfields are taught in lecture and laboratory using Brownfield Action (BA) that is a network-based, interactive, digital space and simulation in which undergraduate students explore and solve problems in geohydrology. In the U.S., BA is recognized nationally as an innovative curriculum and simulation that has been developed by Peter Bower at Barnard College in collaboration with Columbia University's Center for New Media Teaching and Learning. Brownfields are former industrial sites that have potential as recreational, residential, and commercial real estate sites when reclaimed. As part of assessing the value of such a site, an environmental site assessment (ESA) is required to determine the nature and extent of any contamination. To reach that objective, BA contains a narrative element that is embedded and to be discovered in simulation; it is a story of groundwater contamination complete with underground contaminant plumes in a fictitious town with buildings, roads, wells, water tower, homes, and businesses as well as a municipal government with relevant historical documents. Student companies work collaboratively in teams of two, sign a contract with a development corporation to conduct a Phase One ESA, receive a realistic budget, and compete with other teams to fulfill the contract while maximizing profit. To reach a valid conclusion in the form of a professional-level ESA and 3-D maps of the physical site, teams must construct a detailed narrative from diverse forms of information, including socio-historical and a scientific dataset comprised of over 2,000,000 data points. BA forces the students to act on their perceptions of the interlocking realms of knowledge, theory and practical experience, providing an opportunity for them to gain valuable practice at tackling the complexity and ambiguity of a large-scale, interdisciplinary investigation of groundwater contamination and environmental forensics.
(abstract) Student Involvement in the Pluto Mission
NASA Technical Reports Server (NTRS)
Weinstein, Stacy
1994-01-01
The Pluto Fast Flyby mission development baseline consists of 2 identical spacecraft (120 - 165 kg) to be launched to Pluto/ Charon in the late 1990s. These spacecraft are intended to fly by Pluto and Charon in order to perform various remote-sensing scientific investigations and have a mission development cost less than $400M (FY92$) through launch plus 30 days. The Pluto team is committed to involving students in all areas of mission development and operations. In November 1992, the Pluto team sent a request for information to industry and universities looking for ways to lower the mass and cost of the mission. A number of universities responded with creative and promising technological developments. In addition to contracts with industry and other federal labs, contracts were signed with schools which allowed students to apply their research, enabling the Pluto team to use valuable resources on a variety of advanced technology endeavors. Perhaps the most exciting aspect of these investigations was that the deliverables that the students produced were not just final reports, but actual prototype hardware complete with write-ups on lessons learned in machining, programming, and design. Another exciting development was a prototype adapter competition in which 7 universities competed to design, build, and test their idea of a lightweight spacecraft-propulsion stack adapter. Georgia Tech won with an innovative dodecahedron composite lattice cone. Other students from other universities were involved as well. All in all, over 40 students from 20 different colleges made significant contributions to the Pluto Fast Flyby mission development through their efforts. This paper will give an overview of Pluto student involvement, the technologies which they examined, and useful results for the mission.
NASA Technical Reports Server (NTRS)
1995-01-01
Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.
Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A)
NASA Technical Reports Server (NTRS)
Mullooly, William
1995-01-01
This is the thirty-first monthly report for the Earth Observing System (EOS)/Advanced Microwave Sounding Unit- A (AMSU-A), Contract NAS5-32314, and covers the period from 1 July 1995 through 31 July 1995. This period is the nineteenth month of the Implementation Phase which provides for the design, fabrication, assembly, and test of the first EOS/AMSU-A, the Protoflight Model. Included in this report is the Master Program Schedule (Section 2), a report from the Product Team Leaders on the status of all major program elements (Section 3), Drawing status (Section 4), Weight and Power Budgets (CDRL) 503 (Section 5), Performance Assurance (CDRL 204) (Section 6), Configuration Management Status Report (CDRL 203) (Section 7), Documentation/Data Management Status Report (Section 8), and Contract Status (Section 9).
NASA Technical Reports Server (NTRS)
1995-01-01
Marshall Space Flight Center teamed with the University of Alabama in Huntsville (UAH) in 1989 on a program involving development of advanced simulation software. Concurrently, the State of Alabama chartered UAH to conduct a technology advancement program in support of the state's apparel manufacturers. In 1992, under contract to Marshall, UAH developed an apparel-specific software package that allows manufacturers to design and analyze modules without making an actual investment -- it functions on ordinary PC equipment. By 1995, Marshall had responded to requests for the package from more than 400 companies in 36 states; some of which reported savings up to $2 million. The National Garment Company of Missouri, for example, uses the system to design and balance a modular line before committing to expensive hardware; for setting up sewing lines; and for determining the composition of a new team.
NASA Technical Reports Server (NTRS)
Burcham, Michael S.; Daprato, Rebecca C.
2016-01-01
This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.
Sea Water Air Conditioning (SWAC) at Naval Base Guam: Cost-Benefit Analysis and Acquisition Strategy
2015-03-16
significant impact FWS Fish and Wildlife Service GEPA Guam Environmental Protection Agency GPA Guam Power Authority IPT integrated product team...utility energy service contract USACE U.S. Army Corps of Engineers USCG U.S. Coast Guard UXO unexploded ordinance USFWS U.S. Fish and Wildlife ...its bases, such as wind and solar energy. However, ample room remains for new renewable technologies 3 and cost savings at shore installations
Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits
2013-03-07
performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors
2011-03-01
performance of Federal Government Contract Number FA8721-05- C -0003 with Carnegie Mellon University for the operation of the Software Engineering... C Roles and Responsibilities 195 Appendix D Reporting Requirements and Options 201 Appendix E Managed Discovery 203 Appendix F Scoping and...Upgrade Team (SUT) • Mary Busby , Lockheed Martin • Palma Buttles-Valdez, Software Engineering Institute • Paul Byrnes, Integrated System Diagnostics
Building Energy Audit Report, for Hickam AFB, HI
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; De La Rosa, Marcus I.; Brown, Daryl R.
2010-09-30
A building energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Hickam AFB, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This documents reports the results of that assessment.
Space Propulsion Hazards Analysis Manual (SPHAM). Volume 1
1988-10-01
Wiley, New York, 1983, p.p. 64-68 (11) Martin Marietta MCR 82-800, Rev. B, 29 September 1982, "DOD Safety Review Team Lessons Learned Data Base...FLinaIRe-p,.-t, Martin Marietta Technical Report , Contract F42600-81-D-1379, September 1982. (57) Bader, Donaldson, et. al., Liquid Propellant Rocket Abort...Fire Model, Journal of Astronautics and Aeronautics, December 1971. (58) Banning, D., Propellant_$pill Analysi, Martin Marietta Technical Report , July
2015-12-01
access to information? In times of austere budgets, studies have suggested leaders often take on too much risk in sched- ule, performance and cost...about when he assumed command of a failing missile program. One of his first acts was placing PowerPoint slides in every cubicle that read, “Be on ...contract by July.” He continued to emphasize this point over the next few days, individually ask- ing each team member, “How is what you are working on
Integrated Cost Analysis Teams: How ICATs Support Better Buying Power 2.0
2014-06-01
and its procuring contracting officer ( PCO ) with a supportable and sustainable starting position for negotiation. The ICAT can deliver full pricing...proposals as well, arming the PCO with an all-encompassing report. Requesting DCMA assistance is straightforward. The cus- tomer receives a proposal in...any level of support needed to assist the PCO . Conversely, if the schedule is the determining factor, the ICAT can tailor the scope to meet the
2006-10-01
6 Figure 6. CyberStrider (Jacobus et al., 1998, page 17), contract number M67004-96-C-0027. ....7 Figure 7. Veda system...1998 and developed by Veda , Inc., uses optical tracking to locate the user within a defined volume (Lockheed Martin, 1997). The Veda System is...Figure 7. Veda system. 8 In 1993, the Naval Air Warfare Center’s Training Systems Division developed the team tactical
University Funding: Federal Funding Mechanisms in Support of University Research.
1986-02-01
disciplines in elec- tronic sciences. DOE supports a team of researchers in high-energy and nuclear physics through contracts to build customized equipment to...data available on up to 15 federal agen- Collges ,19631982cies, support of science research at universities since 1963. Although not all of the...recent Ph.D. Young Investigators in physicists. High Energy Physics Time in Effect: 1975 to present. Fiscal Year 1984 Average Number of Average
Building Energy Audit Report for Camp Smith, HI
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; De La Rosa, Marcus I.; Brown, Daryl R.
2010-09-30
A detailed energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Camp Smith, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This report documents the results of that assessment.
An Assessment of Team Development at the Air Force Flight Dynamics Laboratory.
1980-09-01
FLIGHT DYNAMICS LABORATORY S. PERFORMING OG. REPORT NUMGER 7. AUTHOR(*) S. CONTRACT ON GRANT NUMBER(s) illiam D. Rutley, Captain, USAF _. PERFORMING ...the change from 1978 to 1980 on eleven criterion variables, employee job satisfaction, job motivation and absenteeism ; five organizational climate...variables except absenteeism . Absenteeism data were obtained from AFFDL intern~al records. The four main pro- duct divisions of AFlDL se.-ve-i as subjects
2006-11-01
exercises. Potential Resolution: 1. Installations must ensure that they understand the composition of civilian populations outside of their...Installation trainers, SRP Support Agency trainers or contract training specialists should layout each range based on the composition defined in the...defined time limit to respond to submittals with a pre-defined team member composition so that changes could be reviewed consistently. Only mission
[The dimensions of the organisational climate as seen by general practitioners].
Delgado Sánchez, Ana; Bellón Saameño, Juan Angel; Martínez-Cañavate López-Montes, María Teresa; Luna del Castillo, Juan de Dios; López Fernández, Luis Andrés; Lardelli Claret, Pablo
2006-05-31
To create and validate a tool to assess the organizational climate (OC) perceived by general practitioners (GP). Descriptive, cross-sectional, and multi-site, study. Health centres (HC) in Jaén and Málaga province Spain. Random sample of 38 HCs and 387 GPs. A self-administered questionnaire in March 2001, with the personal variables of sex, age, graduation date, specialty, kind of contract, time worked in primary care teams, time in current job, list size, case load, tutor of residents and academic qualification. HC variables: urban/rural, team structure, accreditation for teaching residents, service portfolio, out-patient care, and an OC scale of 40 Likert-like questions. We analysed the content validity of the scale by factorial analysis; and its reliability, by Cronbach's alpha and corrected scale-item correlation coefficients. Reply rate was 89.8%, 71% of the GPs were male, mean age was 44, 76% had tenure, and 37% were specialists in family medicine and 28% tutors, 17% with 3rd-year residents, 9% with doctors; 50% of HCs were rural and the mean team structure had 13 GPs and 4 paediatricians. We obtained 12 factors that explained 60% of variance, and 7 factors with reliability coefficients >0.50. We made an OC-positive scale (alpha=.82) with the dimensions for team-work, cohesion and social life; and another OC-negative scale (alpha=.78) composed of team conflict, perceived team failure, excess autonomy, authoritarian management, and GP-nurse tension. We found a questionnaire with good validity and reliability, which was useful for evaluating the OC perceived by GPs.
NASA Technical Reports Server (NTRS)
Bejmuk, Bohdan I.; Williams, Larry
1992-01-01
As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations. The future success of NASA space programs and Rockwell hinges upon the ability to adopt new, more efficient and effective work processes. Efficiency, proficiency, cost effectiveness, and teamwork are a necessity for economic survival. Continuous improvement initiatives like the CEE are, and will continue to be, vehicles by which the road can be traveled with a vision to the future.
NASA Astrophysics Data System (ADS)
Bejmuk, Bohdan I.; Williams, Larry
As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations. The future success of NASA space programs and Rockwell hinges upon the ability to adopt new, more efficient and effective work processes. Efficiency, proficiency, cost effectiveness, and teamwork are a necessity for economic survival. Continuous improvement initiatives like the CEE are, and will continue to be, vehicles by which the road can be traveled with a vision to the future.
Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Schlank, John J.
2010-01-01
In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.
The Hammer Award is presented to KSC and 45th Space Wing.
NASA Technical Reports Server (NTRS)
1999-01-01
At a special presentation of the Hammer Award in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, former Apollo astronauts Neil Armstrong (left) and Edwin 'Buzz' Aldrin (second from right) applauded the recipients, Kennedy Space Center and the 45th Space Wing. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Ed Gormel and Chris Fairey, co-chairs of the SEB, accepted the awards for the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base. Armstrong and Aldrin were at KSC to attend a banquet and other activities for the 30th anniversary of the Apollo 11 mission, which landed the first man on the moon.
1999-07-16
At a special presentation of the Hammer Award in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, former Apollo astronauts Neil Armstrong (left) and Edwin "Buzz" Aldrin (second from right) applauded the recipients, Kennedy Space Center and the 45th Space Wing. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Ed Gormel and Chris Fairey, co-chairs of the SEB, accepted the awards for the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base. Armstrong and Aldrin were at KSC to attend a banquet and other activities for the 30th anniversary of the Apollo 11 mission, which landed the first man on the moon
Mainstreaming in the Philippines programme.
Smith, S
1998-07-01
In the Philippines, where the Oxfam team has worked on gender issues since 1990, the group recently conducted an in-house workshop to identify achievements and areas for improvement in gender mainstreaming. Gender activities began with a needs assessment of the fisheries in 1990 and have included gender-sensitivity training for Oxfam partner groups, support of women's issues, and gender research into such areas as disaster management. Successes include the appointment of women to key positions in the community, which was a direct result of advocacy work. Major challenges include 1) determining the best models to develop sectoral networking and advocacy on gender and 2) overcoming gender-resistance in some partners. The team concluded that it is still learning how to mainstream gender issues and is still searching for a framework to integrate gender into other approaches to planning, monitoring, and evaluation. In the future, Oxfam will 1) undertake small-scale and simple gender reviews with selected partners and then pilot gender-mainstreaming contracts with them, 2) build gender-learning teams within sectoral programs, 3) continue supporting networking and capability-building in feminist organizations, and 4) focus on gender at the next partners' meeting.
Sea Water Air Conditioning (SWAC) at Naval Base Guam: Cost-Beneit Analysis and Acquisition Strategy
2014-12-01
Fish and Wildlife Service GEPA Guam Environmental Protection Agency GPA Guam Power Authority IPT integrated product team MILCON military...energy service contract USACE U.S. Army Corps of Engineers USCG U.S. Coast Guard UXO unexploded ordinance USFWS U.S. Fish and Wildlife Service WOD13...options for its bases, such as wind and solar energy. However, ample room remains for new renewable technologies 3 and cost savings at shore
2016-02-17
However, MDA may encounter challenges with the RKV’s contract strategy, industry collaboration efforts, and schedule because MDA has not yet...negotiated the terms of the RKV modification with the prime contractor, is relying on potential industry competitors to collaborate on developing the RKV...interfaces and standards for its subsystems, called modules. Under the DSC, MDA plans to form a cross industry team consisting of Boeing, Raytheon, and
2015-01-01
and their Applications: Validation and Pilot Steven N. Aude Kenneth Nicely Michael A. Lodato ICF International Christopher L. Vowels...CONTRACT OR GRANT NUMBER W5J9CQ-11-0009 5b. PROGRAM ELEMENT NUMBER 622785 6. AUTHOR(S) Steven N. Aude, Kenneth Nicely, Michael A... Michael A. Lodato ICF International Christopher L. Vowels U.S. Army Research Institute Fort Hood Research Unit Brian T. Crabb
Integrated health care and the advanced practice nurse.
Green, A H; Conway-Welch, C
1995-01-01
As state-designed Medicaid reforms are enacted and commercial insurance carriers begin to manage care, advanced practice nurses (APNs) must be ready to aggressively pursue opportunities for clinical participation. Understanding the contractual obligations of becoming a provider, as well as adopting strategies for successful participation in these emerging integrated networks, will be critical for APNs. Successful contracting requires a carefully defined set of practice activities and a willingness to become a team player in a complex organization.
Ada Software Design Methods Formulation.
1982-10-01
aside for one-to-one, non -judgemental discussions between SofTech and the design teams. SofTech’s role in the meetings was to address any Ada-specific...assurance 1.0 prepare version audits 1.0 monitoring contracts 1.0 library control 1.0 other development 1.0 correspondence 1.0 conduct support design ...quality assurance 2.0 Control Board update training manuals 2.0 participation 2.5 being trained 2.0 formulation of policy 2.5 functional system design
2015-05-18
Aircraft Systems ( SUAS ) Project Office, located in Huntsville, AL, for reset. For return to the SUAS Project Office, 401st AFSB officials stated, the...representatives from SUAS Project Office contacted the 401st AFSB COR at BAF to state that the systems arrived in Huntsville, AL. However, prior to SUAS ...circumstances behind the loss. AC First’s research identified that AC First shipped the systems to SUAS officials at BAF instead of the BAF RPAT
Software Product Lines: Report of the 2010 US Army Software Product Line Workshop
2010-06-01
requirements and statement of work ( SOW ) tasks can be in- cluded in the request for proposal (RFP) and the contract. 2.2.1 Basic Product Line Acquisition... SOW tasks in Figure 1. Two additional tasks (at the third tier level) ac- count for sustaining the production capability over the life cycle and...Acquisition Strategy RFP and SOW Initial Product Line Scope Product Line Business Case Capability Description Document Teaming Product Line
A Cost Benefit Analysis of the Navy Flight Demonstration Team and the U.S. Navy Band
2012-06-01
Music and musicians play an important role in military life. The ceremonial event that is supported by U.S. Navy Bands supports not only Naval...of the Navy and Government Official events, the Navy would have to contract musicians commercially at potentially high costs or accept musical ...determine whether the benefits of musical support to the President of the United States, the Department of Navy, and other senior military and government
Avoiding Terminations, Single Offer Competition, and Costly Change Orders with Fixed-Price Contracts
2015-04-30
deriving performance outputs from FPDS.6 To ensure reproducibility of this analysis and to provide a starting point for future research, the entirety...available in bulk from USAspending.gov starting in FY2000. However, data quality steadily improves over that decade, particularly in the commonly...available prior to FY2007, the study team chose to set FY2007 as the start date rather than risk sample bias by including only those earlier
2012-08-02
Contracting, Program Executive Office for Simulation, Training, and Instrumentation; the Resident Auditor, Raytheon Network Centric Systems, Defense...Router Network (SIPRNET). We appreciate the courtesies extended to the staff. Please direct questions to Mr. Tim Moore at (703) 604-9068 (DSN 664...Raytheon Network Centric System Resident Office, DCAA, should develop and implement procedures to verify that the Army does not reimburse the contractor
SimBRS: A University/Industry Consortium Focused on Simulation Based Solutions for Ground Vehicles
2009-07-29
plan is to use the SimBRS contract mechanism to streamline a process that applies research funds into a managed program, that is cognizant to the... designs . Therefore, the challenge for the SimBRS team is to establish an approach based on the capacity of measured data and simulations to support ...by systematically relating appropriate results from measurements and applied research in engineering and science. In turn, basic research and
Agile Software Teams: How They Engage with Systems Engineering on DoD Acquisition Programs
2014-07-01
under Contract No. FA8721-05-C-0003 with Carnegie Mellon University for the operation of the Software Engineer- ing Institute, a federally funded...issues that would preclude or limit the use of Agile methods within the DoD” [Broadus 2013]. As operational tempos increase and programs fight to...environment in which it operates . This makes software different from other disciplines that have toleranc- es, generally resulting in software engineering
Tanno, Yoshiro
2014-01-01
On August 31, 2011, five months after the Great East Japan Earthquake, Miyagi prefecture reported 9357 dead and 2288 missing citizens, whereas Ishinomaki reported 4753 dead and 1302 missing citizens. A total of 12 pharmacists in Miyagi prefecture had lost their lives. Many medical institutions at the time were rendered out of service due to damage. Ishinomaki Red Cross had to serve as headquarters of disaster medicine management for the area. The government of Miyagi and Miyagi Pharmacist Association signed a contract regarding the provision of medical and/or other related tasks. Nevertheless, the contract was not fully applied given the impact of the tsunami, which caused chaos in telecommunication, traffic, and even the functions of the government. Given the nature of the disaster, medical teams equipped only with emergency equipment could not offer appropriate response to the needs of patients with chronicle diseases. "Personal medicine logbook" and pharmacists were keys to relief works during the disaster. Pharmacists played a critical role not only for self-medication by distributing over the counter (OTC) drugs, but also in hygiene management of the shelter. Apart from the establishment of an adoptive management system for large-scale natural disasters, a coordinated system for disaster medical assistance team (DMAT), Japanese Red Cross (JRC), Self-Defense Force (SDF), and other relief work organizations was imperative.
Embedded Librarian as Research Team Member.
Brahmi, Frances A; Kaplan, F Thomas D
2017-03-01
Adding a librarian to an upper extremity surgical and therapy practice has many advantages (educational, research, remaining on the cutting edge of technology). As an embedded team member, the librarian at the Indiana Hand to Shoulder Center prepares literature reviews, creates Google Scholar Alerts for individual clinicians, and introduces developing technologies such as 3-dimensional printers, Smartphone Apps, and online access to nontraditional resources. With the librarian relieving clinicians of these responsibilities, surgeons can devote more time to clinical and research activities. Private practices unable to support their own librarian could share access to a librarian via Skype, Face Time, and video conferencing. Another small practice alternative is contracting services from a local medical school library that designates a librarian as its liaison. Copyright © 2017 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.
Reimbursement for pediatric diabetes intensive case management: a model for chronic diseases?
Beck, Joni K; Logan, Kathy J; Hamm, Robert M; Sproat, Scott M; Musser, Kathleen M; Everhart, Patricia D; McDermott, Harrold M; Copeland, Kenneth C
2004-01-01
Current reimbursement policies serve as potent disincentives for physicians who provide evaluation and management services exclusively. Such policies threaten nationwide availability of care for personnel-intensive services such as pediatric diabetes. This report describes an approach to improving reimbursement for highly specialized, comprehensive pediatric diabetes management through prospective contracting for services. The objective of this study was to determine whether pediatric diabetes intensive case management services are cost-effective to the payer, the patient, and a pediatric diabetes program. A contract with a third-party payer was created to reimburse for 3 key pediatric diabetes intensive case management components: specialty education, 24/7 telephone access to an educator (and board-certified pediatric endocrinologist as needed), and quarterly educator assessments of self-management skills. Data were collected and analyzed for 15 months after signing the contract. Within the first 15 months after the contract was signed, 22 hospital admissions for diabetic ketoacidosis (DKA) occurred in 16 different patients. After hospitalizations for DKA, all 16 patients were offered participation in the program. All were followed during the subsequent 1 to 15 months of observation. Ten patients elected to participate, and 6 refused participation. Frequency of rehospitalization, emergency department visits, and costs were compared between the 2 groups. Among the 10 participating patients, there was only 1 subsequent DKA admission, whereas among the 6 who refused participation, 5 were rehospitalized for DKA on at least 1 occasion. The 10 patients who participated in the program had greater telephone contact with the team compared with those who did not (16 crisis-management calls vs 0). Costs (education, hospitalization, and emergency department visits) per participating patient were approximately 1350 dollars less than those for nonparticipating patients. Differences between participating and nonparticipating groups included age (participants were of younger age), double-parent households (participants were more likely to be from double parent households), and number of medical visits kept (participants kept more follow-up visits). No differences in duration of diabetes, months followed in the program, sex, or ethnicity were observed. Contracting with third-party payers for pediatric diabetes intensive case management services reduces costs by reducing emergency department and inpatient hospital utilizations, likely a result of intensive education and immediate access to the diabetes health care team for crisis management. Such strategies may prove to be cost saving not only for diabetes management but also for managing other costly and personnel-intensive chronic diseases.
Team Training and Evaluation Strategies: A State-of-Art Review
1976-06-01
W . Tornow , Executive...8217■-’’-■■ ■■-■■;■■"■’’•’■’:•■■■," -.: IP^^^^T- W ^^PIIW’^ W !^?^: ■’ ■ ■ I I I I I I I I I I I I I I I Special Report SR-ED 76-11 O...Room 200 Towson, MD 21204 READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER W TTl B. CONTRACT OR GRANT
NASA Technical Reports Server (NTRS)
Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian
2000-01-01
This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.
Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.
2005-02-01
This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.
2013-06-01
1 18th ICCRTS Using a Functional Simulation of Crisis Management to Test the C2 Agility Model Parameters on Key Performance Variables...AND SUBTITLE Using a Functional Simulation of Crisis Management to Test the C2 Agility Model Parameters on Key Performance Variables 5a. CONTRACT...command in crisis management. C2 Agility Model Agility can be conceptualized at a number of different levels; for instance at the team
High Energy Astrophysics Program
NASA Technical Reports Server (NTRS)
1996-01-01
This report reviews activities performed-by members of the USRA contract team during the six months of the reporting period and projected activities during the coming six months. Activities take place at the Goddard Space Flight Center, visiting the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in Astrophysics. Missions supported include: Advanced Satellite for Cosmology and Astrophysics (ASCA); X-ray Timing Experiment (XTE); X-ray Spectrometer (XRS); Astro-E; High Energy Astrophysics Science Archive Research Center (HEASARC), and others.
2011-12-09
management are inadequate at some FSDs. • No one was held accountable when ANA vehicles and equipment were wrecked /damaged due to command/operator...regions, services provided, facilities constructed, etc. c. DCOM-Programs also hosts a biweekly review that is more of a deep dive contract...Number 37, for additional details.) • NTM-A/CSTC-A’s, “ANA Logistics Deep Dive ” briefing for DOD IG team, Director CJ4, April 28, 2011
High Energy Astrophysics Research and Programmatic Support
NASA Technical Reports Server (NTRS)
Angelini, Lorella
1998-01-01
This report reviews activities performed by members of the USRA contract team during the six months of the reporting period and projected activities during the coming six months. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in Astrophysics. Missions supported include: Advanced Satellite for Cosmology and Astrophysics (ASCA), X-ray Timing Experiment (XTE), X-ray Spectrometer (XRS), Astro-E, High Energy Astrophysics Science Archive Research Center (HEASARC), and others.
High Energy Astrophysics Program (HEAP)
NASA Technical Reports Server (NTRS)
Angelini, Lorella; Corcoran, Michael; Drake, Stephen; McGlynn, Thomas A.; Snowden, Stephen; Mukai, Koji; Cannizzo, John; Lochner, James; Rots, Arnold; Christian, Eric;
1998-01-01
This report reviews activities performed by the members of the USRA contract team during the 6 months of the reporting period and projected activities during the coming 6 months. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in astrophysics. Supported missions include advanced Satellite for Cosmology and Astrophysics (ASCA), X-Ray Timing Experiment (XTE), X-Ray Spectrometer (XRS), Astro-E, High Energy Astrophysics Science Archive Research Center (HEASARC) and others.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.
2010-03-09
This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.
Acquisition and Competition Strategy Options for the DD(X): The U.S. Navy’s 21st Century Destroyer
2006-01-01
5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand Corporation,National Defense Research Institute,1776...In April 2002, one of those teams, led by Nor- throp Grumman Ship Systems ( NGSS ), was selected winner of the competition and awarded a $2.9 billion...Northrop Grumman Ship Systems ( NGSS ) and including Raytheon Systems Co. was selected as winner of that competition and placed under contract to
High Energy Astrophysics Program (HEAP)
NASA Technical Reports Server (NTRS)
Angelini, L.
1998-01-01
This report reviews activities performed by members of the USRA contract team during the six months of the reporting period and projected activities during the coming six months. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in Astrophysics Missions supported include: Advanced Satellite for Cosmology and Astrophysics (ASCA), X-ray Timing Experiment (XTE), X-ray Spectrometer (XRS), Astro-E, High Energy Astrophysics Science Archive Research Center (HEASARC), and others.
2014-09-01
Publication This work was conducted by the Institute for Defense Analyses (IDA) under contract HQ0034-14-D-0001, Project AI-2-3863, “Multidisciplinary...Initiative (MURI) Program is a Department of Defense (DoD) effort that supports academic research teams to conduct basic research addressing...across the govern- ment’s historical records of the MURI grants for a quantitative analysis of the program. In addi- tion, IDA conducted interviews with
High Energy Astrophysics Research and Programmatic Support
NASA Technical Reports Server (NTRS)
Angelini, L. (Editor)
1997-01-01
This report reviews activities performed by members of the USRA contract team during the six months of the reporting period and projected activities during the coming six months. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in Astrophysics. Missions supported include: Advanced Satellite for Cosmology and Astrophysics (ASCA), X-ray Timing Experiment (XTE), X-ray Spectrometer (XRS), Astro-E, High Energy Astrophysics Science Archive Research Center (HEASARC), and others.
Contracting and Monitoring Relationships for Adolescents with Type 1 Diabetes: A Pilot Study
DiMeglio, Linda A.; Stein, Stephanie; Marrero, David G.
2011-01-01
Abstract Background Adolescents are developmentally in a period of transition—from children cared for by their parents to young adults capable of self-care, independent judgment, and self-directed problem solving. We wished to develop a behavioral contract for adolescent diabetes management that addresses some negotiable points of conflict within the parent–child relationship regarding self-monitoring and then assess its effectiveness in a pilot study as part of a novel cell phone–based glucose monitoring system. Methods In the first phase of this study we used semistructured interview techniques to determine the major sources of diabetes-related conflict in the adolescent–parent relationship, to identify factors that could facilitate or inhibit control, and to determine reasonable goals and expectations. These data were then used to inform development of a behavioral contract that addressed the negotiable sources of conflict between parents and their adolescent. The second phase of this research was a 3-month pilot study to measure how a novel cell phone glucose monitoring system would support the contract and have an effect on glucose management, family conflict, and quality of life. Results Interviews were conducted with 10 adolescent–caregiver pairs. The major theme of contention was nagging about diabetes management. Two additional themes emerged as points of negotiation for the behavioral contract: glucose testing and contact with the diabetes clinical team. Ten adolescent–parent pairs participated in the pilot test of the system and contract. There was a significant improvement in the Diabetes Self-Management Profile from 55.2 to 61.1 (P < 0.01). A significant reduction in hemoglobin A1c also occurred, from 8.1% at the start of the trial to 7.6% at 3 months (P < 0.04). Conclusions This study confirms previous findings that mobile technologies do offer significant potential in improving the care of adolescents with type 1 diabetes. Moreover, behavioral contracts may be an important adjunct to reduce nagging and improve outcomes with behavioral changes. PMID:21406011
NASA Astrophysics Data System (ADS)
Harmon, Sally Baden
2001-07-01
The purposes of this case study were to describe how a learning contract was implemented for a seventh-grade life science class and to discover its effects on the learning experiences of the students. A learning contract was a written agreement between the student and the teacher in which the student agreed to complete a variety of assignments for a particular grade. Learning contracts were issued to the students for three grading periods of six weeks. A total of 137 students participated in the case study, which began in September 1997 and culminated at the end of the third grading period in January 1998. The data were collected from three groups: (a) 137 seventh-grade life science students, (b) 48 parents, and (c) the classroom teacher-researcher. In order to guide the collection and analysis of data, twenty-four questions were developed. These questions were then compiled into two surveys. Responses from the student survey indicated that students: (a) signed up for an A more than any other grade, (b) liked working in teams, (c) found it easy to find assignments, (d) set goals to earn high grades, and (e) felt good about their science grades. For the first grading period, eighty-nine percent of parents surveyed responded that they were aware of their children's learning contract grade, and sixty-two percent of the parents surveyed responded that they were satisfied with their children's academic performance using the learning contract. Taped interviews were conducted with former seventh-grade students and the teacher-researcher. In the taped interviews, students told of their positive learning experiences. The teacher-researcher kept a daily journal and used its contents as data. As a result of this case study, the students and the teacher-researcher supported the continued use of the learning contract for the next school year.
[Impact of 3 years of contract implementation on the quality of cataract surgery].
Begiristain, J; Elizalde, B; Ibarluzea, J; Mendicute, J; Sola, C
1999-01-01
To assess the adequacy to clinical practice of cataract procedures contracted in the Gipuzkoa Health Area (in public as well as concerted hospitals) from 1995. A second aim is to identify the achievements obtained three years after its implementation comparing the data with those of 1994, a year before. Before its implementation a multidisciplinar team established the number of surgical procedures to be contracted each year by age and sex, as well as the technical and quality conditions (out-patient surgery, loco-regional anaesthetic, facoemulsification, etc.). Data used for the assessment: Cataracts Registry of the Ophthalmologic Unit, Patient Management Categories and surgical waiting lists. During the period studied, 8,073 cataract operations were performed, 9% higher than expected. The distribution by age and sex was as estimated. Technical and quality standards were fulfilled, except for the surgical waiting list, in at least 75% of the procedures. The surgical technique mainly used was facoenmulsification, increasing from 15% in 1994 to 76.5% in 1997. The contracting of cataract surgery has allowed the assessment, reordering, and establishment of standards of care for all the professionals involved in the process. There were improvements in clinical practice during the period studied. This has given raise to the homogenisation of care in all the units following technical and quality standards, meaning better equity for the patients in need of the procedure.
Satellite-instrument system engineering best practices and lessons
NASA Astrophysics Data System (ADS)
Schueler, Carl F.
2009-08-01
This paper focuses on system engineering development issues driving satellite remote sensing instrumentation cost and schedule. A key best practice is early assessment of mission and instrumentation requirements priorities driving performance trades among major instrumentation measurements: Radiometry, spatial field of view and image quality, and spectral performance. Key lessons include attention to technology availability and applicability to prioritized requirements, care in applying heritage, approaching fixed-price and cost-plus contracts with appropriate attention to risk, and assessing design options with attention to customer preference as well as design performance, and development cost and schedule. A key element of success either in contract competition or execution is team experience. Perhaps the most crucial aspect of success, however, is thorough requirements analysis and flowdown to specifications driving design performance with sufficient parameter margin to allow for mistakes or oversights - the province of system engineering from design inception to development, test and delivery.
Grow your own: case study of a capital alternative.
Pulaski, M J
1999-01-01
The physician-administrator team can take all that is good from the physician practice management company (PPMC) model and apply a variation of self-financing called a "tithe" in order to facilitate their group's growth. Essentially, a group can create its own PPMC for local consolidation purposes, contracting with payers, spreading risk contracts over a larger base of providers, getting access to ancillary services, centralized business office services, bulk purchasing and many other of the advantages extolled by PPMCs. Organization has value, especially in times of specific industry consolidation. Although most everyone agrees that the medical industry is undergoing tremendous consolidation, consolidation will not likely occur "top-down." Rather, it will occur more slowly--one group at a time, one locale at a time. If a group positions itself as a local consolidation leader and amalgamates other groups onto its "token ring," then all participants--especially those who initiate this consolidation--will reap the benefits.
DOE`s annealing prototype demonstration projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warren, J.; Nakos, J.; Rochau, G.
1997-02-01
One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable throughmore » a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.« less
Advanced Space Transportation Program (ASTP)
2002-10-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education, and defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle. For the SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second- generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado along with a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
Advanced Space Transportation Program (ASTP)
2002-10-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education and defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle during separation of stages. For SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first-generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado; a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
Animal Model Development for the Penn State Pediatric Ventricular Assist Device
Carney, Elizabeth L.; Clark, J. Brian; Myers, John L.; Peterson, Rebecca; Wilson, Ronald P.; Weiss, William J.
2009-01-01
In March 2004, the National Heart, Lung, and Blood Institute (NHLBI) awarded five contracts to develop devices providing circulatory support for infants and small children with congenital and acquired cardiac disease. Since 2004, the team at Penn State College of Medicine has developed a pneumatically-actuated ventricular assist device (VAD) with mechanical tilting disk valves. To date, hemodynamic performance, thrombogenesis, and hemolysis have been chronically evaluated in 16 animals, including 4 pygmy goats and 12 sheep. Major complications, mainly respiratory failure, have been encountered and resolved by a multi-disciplinary team. Multi-modal analgesia, appropriate antibiotic therapy, and attentive animal care have contributed to successful outcomes. Time after implant has ranged from 0–40 days. Most recently, a sheep implanted with Version 3 Infant VAD was electively terminated at 35 days post-implant, with no major adverse events. This report describes a successful in vivo model for evaluating a pediatric VAD. PMID:19849686
NASA Technical Reports Server (NTRS)
2002-01-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education, and defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle. For the SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second- generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado along with a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
NASA Technical Reports Server (NTRS)
2002-01-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education and defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle during launch. For SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado along with a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
SLI Artist's Concept-Stage Separation
NASA Technical Reports Server (NTRS)
2002-01-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education and defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle during separation of stages. For SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first-generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado; a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
Research-oriented teaching in optical design course and its function in education
NASA Astrophysics Data System (ADS)
Cen, Zhaofeng; Li, Xiaotong; Liu, Xiangdong; Deng, Shitao
2008-03-01
The principles and operation plans of research-oriented teaching in the course of computer aided optical design are presented, especially the mode of research in practice course. This program includes contract definition phase, project organization and execution, post project evaluation and discussion. Modes of academic organization are used in the practice course of computer aided optical design. In this course the students complete their design projects in research teams by autonomous group approach and cooperative exploration. In this research process they experience the interpersonal relationship in modern society, the importance of cooperation in team, the functions of each individual, the relationships between team members, the competition and cooperation in one academic group and with other groups, and know themselves objectively. In the design practice the knowledge of many academic fields is applied including applied optics, computer programming, engineering software and etc. The characteristic of interdisciplinary is very useful for academic research and makes the students be ready for innovation by integrating the knowledge of interdisciplinary field. As shown by the practice that this teaching mode has taken very important part in bringing up the abilities of engineering, cooperation, digesting the knowledge at a high level and problem analyzing and solving.
High Energy Astrophysics Program
NASA Technical Reports Server (NTRS)
1996-01-01
This report reviews activities performed by members of the USRA (Universities Space Research Association) contract team during the six months during the reporting period (10/95 - 3/96) and projected activities during the coming six months. Activities take place at the Goddard Space Flight Center, within the Laboratory for High Energy Astrophysics. Developments concern instrumentation, observation, data analysis, and theoretical work in Astrophysics. Missions supported include: Advanced Satellite for Cosmology and Astrophysics (ASCA), X-ray Timing Experiment (XTE), X-ray Spectrometer (XRS), Astro-E, High Energy Astrophysics Science, Archive Research Center (HEASARC), and others.
Tips for a physician in getting the right job, part XXIII: starting a new job.
Harolds, Jay A
2015-06-01
After signing a contract, the new doctor has much to do before starting work, such as licensing, credentialing, finding a new home, and moving. There are important tips for a new physician in doing well in a job, such as asking for frequent feedback, doing at least one's share of the work, being at the job and available when expected, being sensitive and helpful to the needs of patients and members of the health care team, cultivating relationships, and in some cases, marketing.
1985-04-01
and all boldface procedures. In addition, include questions from AFR 60-16 and AFR 51-37. Document all such testing on memos to provide an audit trail...your contractor to use simi 1 ar forms. They will provide a clear audit trail for both you and the STAN/EVAL Inspection Team. 22 Supervisory Evaluations...OS m(Mal-j Bedil, 8 72- 3930) 190~e~br1 BJFCTFor-%at of AFForms 8 Acca -mplished by SAC Exaxiners T:AF PRO/F0 (Dot 47) 1. Certificate:- of .%ircrew
EOS Laser Atmosphere Wind Sounder (LAWS) investigation
NASA Technical Reports Server (NTRS)
Emmitt, George D.
1991-01-01
The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'
Herpes rugbiorum: a review on scrum pox and rugby player guidelines.
Alamri, Yassar A S
2011-07-08
Sports, especially contact ones, have long been associated with an increased risk of contracting a communicable disease. Viral infections, in particular, have had an increased attention, due to their adverse effects on athletes' performance. As world sport events have now become more organised and diverse, athletes are now exposed to a wider range of pathogens. With the upcoming Rugby World Cup in 2011 taking place in New Zealand, team-doctors should keep a 'careful' eye on potential infectious outbreaks and make sure to adhere to guidelines accessed through fact sheets.
Goddard High Resolution Spectrograph SV/GTO Project
NASA Technical Reports Server (NTRS)
Ebbets, Dennis
1999-01-01
Contract number NAS5-30433, known at Ball Aerospace as the GHRS SV/GTO project, supported our participation in the post-launch activities of the Goddard High Resolution Spectrograph aboard the Hubble Space Telescope. The period of performance was December 1988 through December 1998. The contract supported the involvement of Dr Dennis Ebbets in the work of the GHRS Investigation Definition Team, and several of the Ball people in the documentation and publication of results. Three main categories of tasks were covered by this contract; in-orbit calibration of the GHRS, guaranteed time observations, and education and public outreach. The nature and accomplishments of these tasks are described in the report. This summary makes many references to publications in the scientific and technical literature. Appendix A is extracted from a complete bibliography, and lists those papers that are directly related to work performed under this GHRS contract. The tasks related to the in-orbit calibration of the GHRS were by far the largest responsibility during the first six years of the project. During this period Dr. Ebbets was responsible for the definition of calibration requirements, design of experiments, preparation of observing proposals, tracking their implementation and execution, and coordinating the analysis and publication of the results. Prior to the launch of HST in 1990 the observing proposals were developed in cooperation with the scientists on the GHRS DDT, engineers at Ball Aerospace, the operations staff at the STScI, and project coordinators at GSFC.
First results from the US-PRC PMI collaboration on EAST
NASA Astrophysics Data System (ADS)
Maingi, R.; Lunsford, R.; Mansfield, D.; Diallo, A.; Hu, J.; Sun, Z.; Zuo, G.; Gong, X.; Tritz, K.; Canik, J.; Osborne, T.; EAST Team
2017-10-01
A US-PRC collaboration was formed to understand the plasma-material interface for improved long pulse discharge performance in EAST, with an emphasis on Li conditioning techniques. The US multi-institutional team consists of participants from PPPL, UI-UC, UT-K, ORNL, MIT, LANL, and JHU. In Dec. 2016, this team co-led experiments on the use of Li aerosol injection to mitigate ELMs, Li granule injection to pace ELMs, and a flowing liquid Li limiter to serve as a primary plasma-facing component. Li aerosol injection was shown to eliminate ELMs using the upper ITER-like W divertor, extending previous results of ELM suppression in the lower cabon divertor (J.S. Hu, PRL 2015). In addition Li granule injection was shown to trigger and even pace ELMs, although the paced ELM frequency was slower than the natural ELM frequency in this set of experiments; previously paced ELM frequency was comparable to natural ELMs frequency (D.K. Mansfield, NF 2013). Finally a second generation flowing liquid Li limiter was shown to be compatible with ELMy H-mode plasmas, pushed within 1 cm of the separatrix. The surface showed no damage to PMI and improved wetting as compared to the first generation limiter experiments (J.S. Hu, NF 2016 and G.Z. Zuo, NF 2017). US scientists supported in part by US DoE contracts DE-AC02-09CH11466, DE-FG02-09ER55012, DE-AC05-00OR22725, and DE-FC02-04ER54698, and ASIPP scientists by Contract No. 11625524, No. 11075185, No. 11021565, and No. 2013GB114004.
Clinical coordination in accountable care organizations: A qualitative study.
Lewis, Valerie A; Schoenherr, Karen; Fraze, Taressa; Cunningham, Aleen
2016-12-06
Accountable care organizations (ACOs) are becoming a common payment and delivery model. Despite widespread interest, little empirical research has examined what efforts or strategies ACOs are using to change care and reduce costs. Knowledge of ACOs' clinical efforts can provide important context for understanding ACO performance, particularly to distinguish arenas where ACOs have and have not attempted care transformation. The aim of the study was to understand ACOs' efforts to change clinical care during the first 18 months of ACO contracts. We conducted semistructured interviews between July and December 2013. Our sample includes ACOs that began performance contracts in 2012, including Medicare Shared Savings Program and Pioneer participants, stratified across key factors. In total, we conducted interviews with executives from 30 ACOs. Iterative qualitative analysis identified common patterns and themes. ACOs in the first year of performance contracts are commonly focusing on four areas: first, transforming primary care through increased access and team-based care; second, reducing avoidable emergency department use; third, strengthening practice-based care management; and fourth, developing new boundary spanner roles and activities. ACOs were doing little around transforming specialty care, acute and postacute care, or standardizing care across practices during the first 18 months of ACO performance contracts. Results suggest that cost reductions associated with ACOs in the first years of contracts may be related to primary care. Although in the long term many hope ACOs will achieve coordination across a wide array of care settings and providers, in the short term providers under ACO contracts are focused largely on primary care-related strategies. Our work provides a template of the common areas of clinical activity in the first years of ACO contracts, which may be informative to providers considering becoming an ACO. Further research will be needed to understand how these strategies are associated with performance.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial License 4.0 (CCBY-NC), where it is permissible to download and share the work provided it is properly cited. The work cannot be changed in any way or used commercially without permission from the journal.
NASA Technical Reports Server (NTRS)
1990-01-01
The Manned Mars System Study (MMSS) was conducted for the Marshall Space Flight Center (MSFC) over the 35 month period between May 15, 1987 and April 30, 1990. During the course of the study, the NASA Office of Exploration (OEXP; Code Z) was created and MSFC was subsequently designated the Transportation Integration Agent (TIA) for support of the OEXP Mission Analysis and Systems Engineering (MASE) team. As a result of this action, modifications to the contract redirected the efforts to be consistent with NASA's overall objectives, including lunar transportation system design. A large number of written submittals were required in order to provide TIA support to MASE. A list summarizing the documents which have been prepared and delivered by Martin Marietta under this contract during the course of this work is presented. In nearly all cases, full sets of view-graphs were also provided to the MSFC COTR, and in several cases magnetic media were provided as well. To incorporate all of these materials (more than 2,000 pages) into the present report would obviously produce an extremely unwieldy and confusing document. Therefore, a summary of key findings are presented in this final report, supplemented by other material produced under this contract but not already available in the widespread literature.
Trust and British Gas partner in EPC scheme.
Bevan, Patrick
2015-02-01
In late August last year the St George's Healthcare NHS Trust in south-west London signed what the Trust's Estates and Facilities team described as 'a historic partnership' with British Gas for a £12 m Energy Performance Contract energy reduction scheme--via which the energy company has guaranteed to deliver £1.1 m in annual savings over the next 15 years. The agreement will see British Gas replace four 35-year-old gas-powered steam boilers and an ageing CHP plant in the boiler house at the Trust's main acute facility, the StGeorge's Hospital in Tooting, and upgrade some of the associated infrastructure. British Gas will also maintain the new plant to ensure that the projected savings are achieved while the Trust owns the new assets. The Trust should gain financially--via lower energy costs and carbon emissions, while estates personnel will be better able to complete the many other estate maintenance issues that would otherwise be contracted out at one of London's biggest acute hospitals.
Upper limb congenital muscular hypertrophy and aberrant muscle syndrome in children.
Dahan, Emmanuel; Chaves, Camilo; Bachy, Manon; Fitoussi, Frank
2018-01-01
Congenital muscle hypertrophy of the upper limb is a very rare condition with unknown aetiology. This descriptive observational and retrospective series included eight children followed by a multidisciplinary team from 2005 to 2017. The diagnosis was based on a cluster of clinical and radiological characteristics after elimination of differential diagnoses. Patients were categorized according to: anomalies of the wrist, anomalies of long fingers of intrinsic or extrinsic origin; and anomalies of the thumb with or without first web space contracture. Treatment begins in young children with hand orthoses to limit muscle contraction and joint malposition. The purpose of surgical treatment was to release contractures and to restore muscle balance through, in the main, finger intrinsic releases and first web releases. At the 2-year follow-up, we found that limited surgical procedures improved finger, thumb and wrist positions. We conclude that muscle hypertrophy is the main cause of deformity and that selective releases of contracted musculo-tendinous units and skin lengthening are effective. IV.
Compliance revisited: pharmaceutical drug trials in the era of the contract research organization.
Jonvallen, Petra
2009-12-01
Over the past decade, the management of clinical trials of pharmaceuticals has become a veritable industry, as evidenced by the emergence and proliferation of contract research organizations (CROs) that co-ordinate and monitor trials. This article focuses on work performed by one CRO involved in the introduction of new software, modelled on industrial production processes, into clinical trial practices. It investigates how this new management technique relates to the work performed in the clinic to ensure that trial participants comply with the protocol. Using an analytical distinction between 'classical' management work and invisible work, the article contextualizes the meaning of compliance in the clinic and suggests that the work involved in producing compliance should be taken into consideration by those concerned with validity of trials, as clinical trials are put under private industrial management. The article builds on participant observation at a Swedish university hospital and interviews the nurses, dieticians, doctors and a software engineer, all part of a team involved in pharmaceutical drug trials on a potential obesity drug.
CASIS Fact Sheet: Hardware and Facilities
NASA Technical Reports Server (NTRS)
Solomon, Michael R.; Romero, Vergel
2016-01-01
Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS
Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.;
1996-01-01
At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.
The Hammer Award is presented to KSC and 45th Space Wing.
NASA Technical Reports Server (NTRS)
1999-01-01
At a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, the Hammer Award is presented to Kennedy Space Center and the 45th Space Wing. Among the attendees in the audience are (center) Center Director Roy D. Bridges Jr., flanked by (at left) Commander of the 45th Space Wing Brig. Gen. F. Randall Starbuck and (at right) Commander of the Air Force Space Command General Richard B. Myers. Standing second from right is NASA Administrator Daniel S. Goldin. At the far right is Morley Winograd, director of the National Partnership for Reinventing Government, who presented the award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J- BOSC) Source Evaluation Board (SEB). Ed Gormel and Chris Fairey, co-chairs of the SEB, accepted the awards for the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base.
1999-07-16
At a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex, the Hammer Award is presented to Kennedy Space Center and the 45th Space Wing. Among the attendees in the audience are (center) Center Director Roy D. Bridges Jr., flanked by (at left) Commander of the 45th Space Wing Brig. Gen. F. Randall Starbuck and (at right) Commander of the Air Force Space Command General Richard B. Myers. Standing second from right is NASA Administrator Daniel S. Goldin. At the far right is Morley Winograd, director of the National Partnership for Reinventing Government, who presented the award. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Ed Gormel and Chris Fairey, co-chairs of the SEB, accepted the awards for the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base
NASA Work Breakdown Structure (WBS) Handbook
NASA Technical Reports Server (NTRS)
Fleming, Jon F.; Poole, Kenneth W.
2016-01-01
The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.
Work Breakdown Structure (WBS) Handbook
NASA Technical Reports Server (NTRS)
2010-01-01
The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.
Advanced Space Transportation Program (ASTP)
2002-10-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education, and Defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle enroute to the International Space Station. For the SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second-generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado along with a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
Scientific and Technical Information (STI) for Financial Assistance and Non-M&O/M&I
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaGrandeur, John; Crane, Doug
2012-07-02
BSST (hereafter referred to as Amerigon) began work in November 2004 under a cost share contract [1] awarded by the U.S. Department of Energy Freedom Car Office to develop a high efficiency Thermoelectric Waste Energy Recovery System for passenger vehicle applications. The system increases fuel economy by partially replacing the electric power produced by the alternator with electric power produced by conversion of exhaust gas in a Thermoelectric Generator (TEG). Amerigon’s team members included the BMW Group and Ford Motor Company, with both OEMs demonstrating the TEG system in their vehicles in the final program phase. Significant progress was mademore » in modeling, building and testing the TEG system from the lowest subassembly levels through an entire vehicle system. By the program’s conclusion, the team had successfully overcome the challenges of integrating TE materials into an exhaust system component and evaluated the system behavior in bench and over the road testing for over six months.« less
In Connecticut: improving patient medication management in primary care.
Smith, Marie; Giuliano, Margherita R; Starkowski, Michael P
2011-04-01
Medications are a cornerstone of the management of most chronic conditions. However, medication discrepancies and medication-related problems-some of which can cause serious harm-are common. Pharmacists have the expertise to identify, resolve, monitor, and prevent these problems. We present findings from a Centers for Medicare and Medicaid Services demonstration project in Connecticut, in which nine pharmacists worked closely with eighty-eight Medicaid patients from July 2009 through May 2010. The pharmacists identified 917 drug therapy problems and resolved nearly 80 [corrected] percent of them after four encounters. The result was an estimated annual saving of $1,123 per patient on medication claims and $472 per patient on medical, hospital, and emergency department expenses-more than enough to pay for the contracted pharmacist services. We recommend that the Center for Medicare and Medicaid Innovation support the evaluation of pharmacist-provided medication management services in primary care medical homes, accountable care organizations, and community health and care transition teams, as well as research to explore how to enhance team-based care.
SLI Artist's Concept-Vehicle Enroute to Space Station
NASA Technical Reports Server (NTRS)
2002-01-01
NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the Space Launch Initiative (SLI), NASA's priority developmental program focused on empowering America's leadership in space. SLI includes commercial, higher education, and Defense partnerships and contracts to offer widespread participation in both the risk and success of developing our nation's next-generation reusable launch vehicle. This photo depicts an artist's concept of a future second-generation launch vehicle enroute to the International Space Station. For the SLI, architecture definition includes all components of the next-generation reusable launch system: Earth-to-orbit vehicles (the Space Shuttle is the first generation earth-to-orbit vehicle), crew transfer vehicles, transfer stages, ground processing systems, flight operations systems, and development of business case strategies. Three contractor teams have each been funded to develop potential second-generation reusable launch system architectures: The Boeing Company of Seal Beach, California; Lockheed Martin Corporation of Denver, Colorado along with a team including Northrop Grumman of El Segundo, California; and Orbital Sciences Corporation of Dulles, Virginia.
NASA Astrophysics Data System (ADS)
Xu, Pengpeng
Hotel building is one of the high-energy-consuming building types, and retrofitting hotel buildings is an untapped solution to help cut carbon emissions contributing towards sustainable development. Energy Performance Contracting (EPC) has been promulgated as a market mechanism for the delivery of energy efficiency projects. EPC mechanism has been introduced into China relatively recently, and it has not been implemented successfully in building energy efficiency retrofit projects. The aim of this research is to develop a model for achieving the sustainability of Building Energy Efficiency Retrofit (BEER) in hotel buildings under the Energy Performance Contracting (EPC) mechanism. The objectives include: • To identify a set of Key Performance Indicators (KPIs) for measuring the sustainability of BEER in hotel buildings; • To identify Critical Success Factors (CSFs) under EPC mechanism that have a strong correlation with sustainable BEER project; • To develop a model explaining the relationships between the CSFs and the sustainability performance of BEER in hotel building. Literature reviews revealed the essence of sustainable BEER and EPC, which help to develop a conceptual framework for analyzing sustainable BEER under EPC mechanism in hotel buildings. 11 potential KPIs for sustainable BEER and 28 success factors of EPC were selected based on the developed framework. A questionnaire survey was conducted to ascertain the importance of selected performance indicators and success factors. Fuzzy set theory was adopted in identifying the KPIs. Six KPIs were identified from the 11 selected performance indicators. Through a questionnaire survey, out of the 28 success factors, 21 Critical Success Factors (CSFs) were also indentified. Using the factor analysis technique, the 21 identified CSFs in this study were grouped into six clusters to help explain project success of sustainable BEER. Finally, AHP/ANP approach was used in this research to develop a model to examine the interrelationships among the identified CSFs, KPIs, and sustainable dimensions of BEER. The findings indicate that the success of sustainable BEER in hotel buildings under the EPC mechanism is mainly decided by project objectives control mechanism, available technology, organizing capacity of team leader, trust among partners, accurate M&V, and team workers' technical skills.
Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Crocker, Andrew M.; Doering, Kimberly B; Meadows, Robert G.; Lariviere, Brian W.; Graham, Jerry B.
2015-01-01
The stated goals of NASA's Research Announcement for the Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS; and enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. Dynetics, Inc. and Aerojet Rocketdyne (AR) formed a team to offer a wide-ranging set of risk reduction activities and full-scale, system-level demonstrations that support NASA's ABEDRR goals. For NASA's SLS ABEDRR procurement, Dynetics and AR formed a team to offer a series of full-scale risk mitigation hardware demonstrations for an affordable booster approach that meets the evolved capabilities of the SLS. To establish a basis for the risk reduction activities, the Dynetics Team developed a booster design that takes advantage of the flight-proven Apollo-Saturn F-1. Using NASA's vehicle assumptions for the SLS Block 2, a two-engine, F-1-based booster design delivers 150 mT (331 klbm) payload to LEO, 20 mT (44 klbm) above NASA's requirements. This enables a low-cost, robust approach to structural design. During the ABEDRR effort, the Dynetics Team has modified proven Apollo-Saturn components and subsystems to improve affordability and reliability (e.g., reduce parts counts, touch labor, or use lower cost manufacturing processes and materials). The team has built hardware to validate production costs and completed tests to demonstrate it can meet performance requirements. State-of-the-art manufacturing and processing techniques have been applied to the heritage F-1, resulting in a low recurring cost engine while retaining the benefits of Apollo-era experience. NASA test facilities have been used to perform low-cost risk-reduction engine testing. In early 2014, NASA and the Dynetics Team agreed to move additional large liquid oxygen/kerosene engine work under Dynetics' ABEDRR contract. Also led by AR, the objectives of this work are to demonstrate combustion stability and measure performance of a 500,000 lbf class Oxidizer-Rich Staged Combustion (ORSC) cycle main injector. A trade study was completed to investigate the feasibility, cost effectiveness, and technical maturity of a domestically produced Atlas V engine that could also potentially satisfy NASA SLS payload-to-orbit requirements via an advanced booster application. Engine physical dimensions and performance parameters resulting from this study provide the system level requirements for the ORSC risk reduction test article. The test article is scheduled to complete critical design review this fall and begin testing in 2017. Dynetics has also designed, developed, and built innovative tank and structure assemblies using friction stir welding to leverage recent NASA investments in manufacturing tools, facilities, and processes, significantly reducing development and recurring costs. The full-scale cryotank assembly was used to verify the structural design and prove affordable processes. Dynetics performed hydrostatic and cryothermal proof tests on the assembly to verify the assembly meets performance requirements. This paper will discuss the ABEDRR engine task and structures task achievements to date and the remaining effort through the end of the contract.
Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence
NASA Technical Reports Server (NTRS)
Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)
2001-01-01
This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.
Development of High Efficacy, Low Cost Phosphorescent Oled Lightning Luminaire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael Hack
In this two year program, UDC together with Armstrong World Industries, Professor Stephen Forrest (University of Michigan) and Professor Mark Thompson (University of Southern California) planned to develop and deliver high efficiency OLED lighting luminaires as part of an integrated ceiling illumination system that exceed the Department of Energy (DOE) 2010 performance projections. Specifically the UDC team in 2010 delivered two prototype OLED ceiling illumination systems, each consisting of four individual OLED lighting panels on glass integrated into Armstrong's novel TechZone open architecture ceiling systems, at an overall system efficacy of 51 lm/W, a CRI = 85 and a projectedmore » lifetime to 70% of initial luminance to exceed 10,000 hours. This accomplishment represents a 50% increase in luminaire efficacy and a factor of two in lifetime over that outlined in the solicitation. In addition, the team has also delivered one 15cm x 15cm lighting panel fabricated on a flexible metal foil substrate, demonstrating the possibility using OLEDs in a range of form factors. During this program, our Team has pursued the commercialization of these OLED based ceiling luminaires, with a goal to launch commercial products within the next three years. We have proven that our team is ideally suited to develop these highly novel and efficient solid state lighting luminaires, having both the technical experience and commercial strategy to leverage work performed under this contract. Our calculations show that the success of our program could lead to energy savings of more than 0.5 quads or 8 MMTC (million metric tons of carbon) per year by 2016.« less
McCall, Alan; Davison, Michael; Andersen, Thor Einar; Beasley, Ian; Bizzini, Mario; Dupont, Gregory; Duffield, Rob; Carling, Chris; Dvorak, Jiri
2015-01-01
Purpose The available scientific research regarding injury prevention practices in international football is sparse. The purpose of this study was to quantify current practice with regard to (1) injury prevention of top-level footballers competing in an international tournament, and (2) determine the main challenges and issues faced by practitioners in these national teams. Methods A survey was administered to physicians of the 32 competing national teams at the FIFA 2014 World Cup. The survey included 4 sections regarding perceptions and practices concerning non-contact injuries: (1) risk factors, (2) screening tests and monitoring tools, (3) preventative strategies and (4) reflection on their experience at the World Cup. Results Following responses from all teams (100%), the present study revealed the most important intrinsic (previous injury, accumulated fatigue, agonist:antagonist muscle imbalance) and extrinsic (reduced recovery time, training load prior to and during World Cup, congested fixtures) risk factors during the FIFA 2014 World Cup. The 5 most commonly used tests for risk factors were: flexibility, fitness, joint mobility, balance and strength; monitoring tools commonly used were: medical screen, minutes/matches played, subjective and objective wellness, heart rate and biochemical markers. The 5 most important preventative exercises were: flexibility, core, combined contractions, balance and eccentric. Conclusions The present study showed that many of the National football (soccer) teams’ injury prevention perceptions and practices follow a coherent approach. There remains, however, a lack of consistent research findings to support some of these perceptions and practices. PMID:25878078
Quality user support: Supporting quality users
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woolley, T.C.
1994-12-31
During the past decade, fundamental changes have occurred in technical computing in the oil industry. Technical computing systems have moved from local, fragmented quantity, to global, integrated, quality. The compute power available to the average geoscientist at his desktop has grown exponentially. Technical computing applications have increased in integration and complexity. At the same time, there has been a significant change in the work force due to the pressures of restructuring, and the increased focus on international opportunities. The profile of the user of technical computing resources has changed. Users are generally more mature, knowledgeable, and team oriented than theirmore » predecessors. In the 1990s, computer literacy is a requirement. This paper describes the steps taken by Oryx Energy Company to address the problems and opportunities created by the explosive growth in computing power and needs, coupled with the contraction of the business. A successful user support strategy will be described. Characteristics of the program include: (1) Client driven support; (2) Empowerment of highly skilled professionals to fill the support role; (3) Routine and ongoing modification to the support plan; (4) Utilization of the support assignment to create highly trained advocates on the line; (5) Integration of the support role to the reservoir management team. Results of the plan include a highly trained work force, stakeholder teams that include support personnel, and global support from a centralized support organization.« less
Additively Manufactured, Net Shape Powder Metallurgy Cans for Valves Used in Energy Production
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peter, William H.; Gandy, David; Lannom, Robert
This CRADA NFE-14-05241 was conducted as a Technical Collaboration project within the Oak Ridge National Laboratory (ORNL) Manufacturing Demonstration Facility (MDF) sponsored by the US Department of Energy Advanced Manufacturing Office (CPS Agreement Number 24761). Opportunities for MDF technical collaborations are listed in the announcement “Manufacturing Demonstration Facility Technology Collaborations for US Manufacturers in Advanced Manufacturing and Materials Technologies” posted at http://web.ornl.gov/sci/manufacturing/docs/FBO-ORNL-MDF-2013-2.pdf. The goal of technical collaborations is to engage industry partners to participate in short-term, collaborative projects within the Manufacturing Demonstration Facility (MDF) to assess applicability and of new energy efficient manufacturing technologies. Research sponsored by the U.S. Departmentmore » of Energy, Office of Energy Efficiency and Renewable Energy, Advanced Manufacturing Office, under contract DE-AC05-00OR22725 with UT-Battelle, LLC.ORNL would like to acknowledge the leadership of EPRI in pulling together the extensive team and managing the execution of the project. In addition, ORNL would like to acknowledge the other contributions of the team members associated with this project. Quintus provided time, access, expertise, and labor of their hydro forming capabilities to evaluate both conventional and additively manufactured tools through this process. Crane ChemPharma Energy provided guidance and information on valve geometries. Carpenter Powder Products was involved with the team providing information on powder processing as it pertains to the canning and hot isostatic pressing of powder. on providing powder and knowledge as it pertains to powder supply for hot isostatic pressing; they also provided powder for the test trials by the industrial team. Bodycote provided guidance on hot isostatic pressing and can requirements. They were also responsible for the hot isostatic pressing of the test valve performed by the industrial team.« less
UK GPs' and practice nurses' views of continuity of care for patients with type 2 diabetes.
Alazri, Mohammed H; Heywood, Philip; Neal, Richard D; Leese, Brenda
2007-04-01
Continuity of care is widely regarded as a core value of primary care. Type 2 diabetes is a common chronic disease with major health, social and economic impacts. Primary health care professionals in many countries are involved in the management of patients with type 2 diabetes, but their perspectives on continuity remain neglected in research. To explore UK GPs' and nurses' experiences of continuity of care for patients with type 2 diabetes in primary care settings. Semi-structured individual interviews were conducted with 16 GPs and 18 practice nurses who manage patients with type 2 diabetes recruited from 20 practices with various organizational structures in Leeds, UK. Three types of continuities were identified: relational continuity from the same health care professional, team continuity from a group of health care professionals and cross-boundary continuity across primary-secondary care settings. Relational continuity was influenced by the quality of the patient-health care professional relationship, policy of the National Health Service (NHS) in the UK (new General Medical Services contract), walk-in centres, the behaviour of receptionists and the structure and systems of the practice. Team and cross-boundary continuities were influenced by the relationship between team members and by effective communication. Relational continuity contributed to more 'personal care', but the usual health care professional might know less about diabetes. Team continuity was important in providing 'physical care', but patients could be confused by conflicting advice from different professionals. Cross-boundary continuity helps to provide 'expert advice', but is dependent upon effective communication. GPs and practice nurses dealing with patients with type 2 diabetes identified three types of continuities, each influenced by several factors. Relational continuity deals better with psychosocial care while team continuity promotes better physical care; therefore, imposing one type of continuity may inhibit good diabetic care. Cross-boundary continuity between primary and secondary care is fundamental to contemporary diabetic services and ways should be found to achieve more effective communication.
A cost benefit analysis of outsourced laboratory services.
Bowers, J A
1995-11-01
As healthcare moves toward increased capitation, hospital administrators must be aware of all costs associated with patient services. This article describes the cost benefit analysis process used by northern Indiana hospital consumers during 1994-1995 to evaluate a local laboratory service outsource provider, South Bend Medical Foundation (SBMF). In an effort to meet the best interests of the community at large, three competing hospitals, medical leadership, and the local outsource provider joined forces to ensure that cost effective quality services would be provided. Laboratory utilization patterns for common DRGs were also analyzed. The team created a reconfiguration analysis to help develop benchmark figures for consideration in future contract negotiations.
2012-06-27
notes and team orienteering functions. Data collection with the MP system at the former Camp Beale, CA is shown in Figure 5- 2 (right). 5.3.3...Naval Research Laboratory Washington, DC 20375-5320 NRL/MR/ 6110 --12-9424 TEMTADS Adjunct Sensor Systems Hand-held EMI Sensor for Cued UXO...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 2 . REPORT TYPE1. REPORT DATE (DD
The matter-ekpyrotic bounce scenario in Loop Quantum Cosmology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haro, Jaume; Amorós, Jaume; Saló, Llibert Aresté, E-mail: jaime.haro@upc.edu, E-mail: jaume.amoros@upc.edu, E-mail: llibert.areste@estudiant.upc.edu
We will perform a detailed study of the matter-ekpyrotic bouncing scenario in Loop Quantum Cosmology using the methods of the dynamical systems theory. We will show that when the background is driven by a single scalar field, at very late times, in the contracting phase, all orbits depict a matter dominated Universe, which evolves to an ekpyrotic phase. After the bounce the Universe enters in the expanding phase, where the orbits leave the ekpyrotic regime going to a kination (also named deflationary) regime. Moreover, this scenario supports the production of heavy massive particles conformally coupled with gravity, which reheats themore » universe at temperatures compatible with the nucleosynthesis bounds and also the production of massless particles non-conformally coupled with gravity leading to very high reheating temperatures but ensuring the nucleosynthesis success. Dealing with cosmological perturbations, these background dynamics produce a nearly scale invariant power spectrum for the modes that leave the Hubble radius, in the contracting phase, when the Universe is quasi-matter dominated, whose spectral index and corresponding running is compatible with the recent experimental data obtained by PLANCK's team.« less
What Information Theory Says About Best Response and About Binding Contracts
NASA Technical Reports Server (NTRS)
Wolpert, David H.
2004-01-01
Product Distribution (PD) theory is the information-theoretic extension of conventional full- rationality game theory to bounded rational games. Here PD theory is used to investigate games in which the players use bounded rational best-response strategies. This investigation illuminates how to determine the optimal organization chart for a corporation, or more generally how to order the sequence of moves of the players / employees so as to optimize an overall objective function. It is then shown that in the continuum-time limit, bounded rational best response games result in a variant of the replicator dynamics of evolutionary game theory. This variant is then investigated for team games, in which the players share the same utility function, by showing that such continuum- limit bounded rational best response is identical to Newton-Raphson iterative optimization of the shared utility function. Next PD theory is used to investigate changing the coordinate system of the game, i.e., changing the mapping from the joint move of the players to the arguments in the utility functions. Such a change couples those arguments, essentially by making each players move be an offered binding contract.
Environmental safety & health requirements for a federal facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, G.; Wong, J.
1995-09-01
I would like to take this opportunity to discuss the challenges that face an environmental, safety, and health (ES&H) manager at a federal facility situated in California. The challenges are, in many aspects, similar to those facing ES&H professionals all over this country: dwindling resources and increasing regulatory demands. The Laboratory (LLNL) is under closer scrutiny than other R&D facilities located in California because some of its research activities involve nuclear weapon design. Today I would like to talk about two actions we, the ES&H management at LLNL, have taken to decrease the impact of dwindling resources and increasing regulatorymore » demands: (1) Institution of a performance-based contract, which the University of California negotiated with the Department of Energy (DOE) to reduce the impact of special mandates required of federal facilities. Under this contract, ES&H performance is measured by results rather than by process; (2) Redesign of the LLNL Hazards Control Department to a flat organization that incorporates employee empowerment and Self-Managed Work Teams (SMWTs).« less
Grant, Suzanne; Huby, Guro; Watkins, Francis; Checkland, Kath; McDonald, Ruth; Davies, Huw; Guthrie, Bruce
2009-03-01
The 2004 new General Medical Services (nGMS) contract exemplifies trends across the public services towards increased definition, measurement and regulation of professional work, with general practice income now largely dependent on the quality of care provided across a range of clinical and organisational indicators known collectively as the 'Quality and Outcomes Framework' (QOF). This paper reports an ethnographically based study of the impact of the new contract and the financial incentives contained within it on professional boundaries in UK general practice. The distribution of clinical and administrative work has changed significantly and there has been a new concentration of authority, with QOF decision making and monitoring being led by an internal QOF team of clinical and managerial staff who make the major practice-level decisions about QOF, monitor progress against targets, and intervene to resolve areas or indicators at risk of missing targets. General practitioners and nurses, however, appear to have accommodated these changes by re-creating long established narratives on professional boundaries and clinical hierarchies. This paper is concerned with the impact of these new arrangements on existing clinical hierarchies.
Nursing from the casual pool: focus group study to explore the experiences of casual nurses.
FitzGerald, Mary; McMillan, Margaret; Maguire, Jane Margaret
2007-08-01
The use of flexible non-contract nursing staff is increasing in Australia and in other countries where there is currently a nursing shortage. There is sparse empirical evidence relating to the experience of these nurses. This focus group study with six groups of enrolled and registered nurses in one regional health authority in New South Wales reports on the challenges and rewards of working through the casual pool. The textual data were coded and reported in themes and subthemes; the overarching theme is balance of social and professional life, while subthemes are social politics, nursing work and professional performance. The results reveal that nurses who work from the casual pool have insight into the work environment and culture of clinical teams that is untapped formally. They have little or no chance to provide clinical teams with feedback or receive feedback on their own performance. The consequence of this study has been the development of a two-way performance intervention to promote high standards of care from nurses who work from the casual pool and the promotion of safe clinical environments and cultures.
MABEL at IPAC: managing address books and email lists at the Infrared Processing and Analysis Center
NASA Astrophysics Data System (ADS)
Crane, Megan; Brinkworth, Carolyn; Gelino, Dawn; O'Leary, Ellen
2012-09-01
The Infrared Processing and Analysis Center (IPAC), located on the campus of the California Institute of Technology, is NASA's multi-mission data center for infrared astrophysics. Some of IPAC's services include administering data analysis funding awards to the astronomical community, organizing conferences and workshops, and soliciting and selecting fellowship and observing proposals. As most of these services are repeated annually or biannually, it becomes necessary to maintain multiple lists of email contacts associated with each service. MABEL is a PHP/MySQL web database application designed to facilitate this process. It serves as an address book containing up-to-date contact information for thousands of recipients. Recipients may be assigned to any number of email lists categorized by IPAC project and team. Lists may be public (viewable by all project members) or private (viewable only by team members). MABEL can also be used to send HTML or plain-text emails to multiple lists at once and prevents duplicate emails to a single recipient. This work was performed at the California Institute of Technology under contract to the National Aeronautics and Space Administration.
NASA Technical Reports Server (NTRS)
Volmer, Paul; Sullivan, Pam (Technical Monitor)
2003-01-01
The Advanced Camera for Surveys ACS was launched aboard the Space Shuttle Columbia just before dawn on March 1, 2002. After successfully docking with the Hubble Space Telescope (HST), several components were replaced. One of the components was the Advanced Camera for Surveys built by Ball Aerospace & Technologies Corp. (BATC) in Boulder, Colorado. Over the life of the HST contract at BATC hundreds of employees had the pleasure of working on the concept, design, fabrication, assembly and test of ACS. Those employees thank NASA - Goddard Space Flight Center and the science team at Johns Hopkins University (JHU) for the opportunity to participate in building a great science instrument for HST. After installation in HST a mini-functional test was performed and later a complete functional test. ACS performed well and has continued performing well since then. One of the greatest rewards for the BATC employees is a satisfied science team. Following is an excerpt from the JHU final report, "The foremost promise of ACS was to increase Hubble's capability for surveys in the near infrared by a factor of 10. That promise was kept. "
Flight demonstration of laser diode initiated ordnance
NASA Technical Reports Server (NTRS)
Boucher, Craig J.; Schulze, Norman R.
1995-01-01
A program has been initiated by NASA Headquarters to validate laser initiated ordnance in flight applications. The primary program goal is to bring together a team of government and industry members to develop a laser initiated ordnance system having the test and analysis pedigree to be flown on launch vehicles. The culmination of this effort was a flight of the Pegasus launch vehicle which had two fin rockets initiated by this laser system. In addition, a laser initiated ordnance squib was fired into a pressure bomb during thrusting flight. The complete ordnance system comprising a laser diode firing unit, fiber optic cable assembly, laser initiated detonator, and laser initiated squib was designed and built by The Ensign Bickford Company. The hardware was tested to the requirements of the Pegasus launch vehicle and integrated into the vehicle by The Ensign Bickford Company and the Orbital Sciences Corporation. Discussions include initial program concept, contract implementation, team member responsibilities, analysis results, vehicle integration, safing architecture, ordnance interfaces, mission timeline and telemetry data. A complete system description, summary of the analyses, the qualification test results, and the results of flight are included.
NASA Technical Reports Server (NTRS)
Rowe, Sidney E.
2010-01-01
In September 2007, the Engineering Directorate at the Marshall Space Flight Center (MSFC) created the Design System Focus Team (DSFT). MSFC was responsible for the in-house design and development of the Ares 1 Upper Stage and the Engineering Directorate was preparing to deploy a new electronic Configuration Management and Data Management System with the Design Data Management System (DDMS) based upon a Commercial Off The Shelf (COTS) Product Data Management (PDM) System. The DSFT was to establish standardized CAD practices and a new data life cycle for design data. Of special interest here, the design teams were to implement Model Based Definition (MBD) in support of the Upper Stage manufacturing contract. It is noted that this MBD does use partially dimensioned drawings for auxiliary information to the model. The design data lifecycle implemented several new release states to be used prior to formal release that allowed the models to move through a flow of progressive maturity. The DSFT identified some 17 Lessons Learned as outcomes of the standards development, pathfinder deployments and initial application to the Upper Stage design completion. Some of the high value examples are reviewed.
NASA Technology Applications Team: Commercial applications of aerospace technology
NASA Technical Reports Server (NTRS)
1994-01-01
The Research Triangle Institute (RTI) is pleased to report the results of NASA contract NASW-4367, 'Operation of a Technology Applications Team'. Through a period of significant change within NASA, the RTI Team has maintained its focus on helping NASA establish partnerships with U.S. industry for dual use development and technology commercialization. Our emphasis has been on outcomes, such as licenses, industry partnerships and commercialization of technologies that are important to NASA in its mission of contributing to the improved competitive position of U.S. industry. RTI's ongoing commitment to quality and customer responsiveness has driven our staff to continuously improve our technology transfer methodologies to meet NASA's requirements. For example, RTI has emphasized the following areas: (1) Methodology For Technology Assessment and Marketing: RTI has developed an implemented effective processes for assessing the commercial potential of NASA technologies. These processes resulted from an RTI study of best practices, hands-on experience, and extensive interaction with the NASA Field Centers to adapt to their specific needs; (2) Effective Marketing Strategies: RTI surveyed industry technology managers to determine effective marketing tools and strategies. The Technology Opportunity Announcement format and content were developed as a result of this industry input. For technologies with a dynamic visual impact, RTI has developed a stand-alone demonstration diskette that was successful in developing industry interest in licensing the technology; and (3) Responsiveness to NASA Requirements: RTI listened to our customer (NASA) and designed our processes to conform with the internal procedures and resources at each NASA Field Center and the direction provided by NASA's Agenda for Change. This report covers the activities of the Research Triangle Institute Technology Applications Team for the period 1 October 1993 through 31 December 1994.
Aalto, Anna-Mari; Heponiemi, Tarja; Väänänen, Ari; Bergbom, Barbara; Sinervo, Timo; Elovainio, Marko
2014-08-01
International mobility of health care professionals is increasing, though little is known about how working in a culturally diverse team affects the native physicians' psychosocial work environment. We examined Finnish physicians' perceptions of work-related wellbeing according to whether they had foreign-born colleagues (FBCs) in their work unit. We also examined whether work-related resources moderate the potential association between work-related wellbeing and working alongside FBCs. A cross-sectional survey was conducted for a random sample of physicians in Finland in 2010 (3826 respondents, response rate 55%). Analyses were restricted to native Finnish physicians working in public health care. The results were analyzed by ANCOVA. In unadjusted analyses, having FBCs was related to poor team climate (p<0.001) and poor job satisfaction (p=0.001). Those physicians who reported high procedural justice and high job control perceived also higher job satisfaction even if they had many FBCs in the work unit (p=0.007 for interaction between FBCs and procedural justice and p<0.001 for interaction between FBCs and job control). These associations were robust to adjustments for age, sex, health care sector, specialization, on-call duty, employment contract, full-time employment and leadership position. The results indicate that culturally diverse work units face challenges related to team climate and job satisfaction. The results also show that leadership plays an important role in culturally diverse work units. The potential challenges of culturally diverse teams for native physicians may be reduced by fair decision-making and by increasing physicians' job control. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
Aeronautics Autonomy Testbed Capability (AATC) Team Developed Concepts
NASA Technical Reports Server (NTRS)
Smith, Phillip J.
2018-01-01
In 2015, the National Aeronautics and Space Administration (NASA) formed a multi-center, interdisciplinary team of engineers from three different aeronautics research centers who were tasked with improving NASA autonomy research capabilities. This group was subsequently named the Aeronautics Autonomy Testbed Capability (AATC) team. To aid in confronting the autonomy research directive, NASA contracted IDEO, a design firm, to provide consultants and guides to educate NASA engineers through the practice of design thinking, which is an unconventional method for aerospace design processes. The team then began learning about autonomy research challenges by conducting interviews with a diverse group of researchers and pilots, military personnel and civilians, experts and amateurs. Part of this design thinking process involved developing ideas for products or programs known as concepts that could enable real world fulfillment of the most important latent needs identified through analysis of the interviews. The concepts are intended to be sacrificial, intermediate steps in the design thinking process and are presented in this report to record the efforts of the AATC group. Descriptions are provided in present tense to allow for further ideation and imagining the concept as reality as was attempted during the teams discussions and interviews. This does not indicate that the concepts are actually in practice within NASA though there may be similar existing programs independent of AATC. These concepts were primarily created at two distinct stages during the design thinking process. After the initial interviews, there was a workshop for concept development and the resulting ideas are shown in this work as from the First Round. As part of succeeding interviews, the team members presented the First Round concepts to refine the understanding of existing research needs. This knowledge was then used to generate an additional set of concepts denoted as the Second Round. Some concepts were created by a single person in a few minutes while others were refined by the entire team over several weeks. Thus, certain ideas are more detailed than others but those from the second round are not necessarily more comprehensive than the first round concepts. Primarily, as reported here in the Second Round section, the designs serve to encompass more of the high level end user research needs which were not necessarily known to the team during the prior workshop. In the figures provided throughout this report, illustrations are often provided to represent a concept. Nearly all of the images are informal sketches or renderings and this casualness should, hopefully, not be held to negate the potential insights available within the concepts.
Kootenai River Focus Watershed Coordination, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kootenai River Network,
2005-07-01
The Kootenai River Network (KRN) was contracted by the Bonneville Power Administration; PPA Project Number 96087200 for the period June 1, 2004 to May 31, 2005 to provide Kootenai River basin watershed coordination services. The prime focus of the KRN Watershed Coordination Program is coordinating projects and disseminating information related to watershed improvement and education and outreach with other interest groups in the Kootenai River basin. The KRN willingly shares its resources with these groups. The 2004-2005 BPA contract extended the original Montana Fish, Wildlife and Parks contract, which was transferred to the Kootenai River Network through a Memorandum ofmore » Understanding in November 2001. The KRN objectives of this contract were carried out by one half-time Watershed Coordinator position in Montana-Idaho (Nancy Zapotocki) and one half-time Watershed Coordination team in British Columbia (Laura and Jim Duncan). Nancy Zapotocki was hired as the KRN US Watershed Coordinator in July 2004. Her extensive work experience in outreach and education and watershed planning complements the Duncans in British Columbia. To continue rejuvenating and revitalizing the KRN, the Board conducted a second retreat in November 2004. The first retreat took place in November 2003. Board and staff members combined efforts to define KRN goals and ways of achieving them. An Education and Outreach Plan formulated by the Watershed Coordinators was used to guide much of the discussions. The conclusions reached during the retreat specified four ''flagship'' projects for 2005-2006, to: (1) Provide leadership and facilitation, and build on current work related to the TMDL plans and planning efforts on the United States side of the border. (2) Continue facilitating trans-boundary British Columbia projects building on established work and applying the KRN model of project facilitation to other areas of the Kootenai basin. (3) Finalize and implement the KRN Education and Outreach plan. (4) Use GIS mapping to prioritize US and BC projects and prioritize education and outreach efforts. The KRN established Kootenay River Network-BC as a registered Society and are pursuing charitable status for this sister organization. Having an organization in both the US and Canada will allow the KRN to apply for and to manage funds as well as to coordinate education and outreach workshops, seminars and tours with greater ease. The recent accomplishments by the Joseph Creek Community Action Team in Cranbrook demonstrate the significant trans-boundary abilities of the KRN. On May 26, 2005, KRN received a prestigious Watershed Stewardship award from the Montana Watershed Coordination Council, which represents over 80 watershed groups in the State of Montana. The award was presented by Governor Brian Schweitzer in the rotunda of the State Capital building in Helena Montana.« less
Bagat, Mario; Drakulić, Velibor; Sekelj Kauzlarić, Katarina; Vlahusić, Andro; Bilić, Ivica; Matanić, Dubravka
2008-06-01
To examine the association of counties' urbanization level and gross domestic product (GDP) per capita on the access to health care. Counties were divided in two groups according to the urbanization level and GDP per capita in purchasing power standards. The number of physicians per 100,000 inhabitants, the number of physicians in hospitals in four basic specialties, physicians' workload, average duration of working week, the average number of insurants per general practice (GP) team, and the number of inhabitants covered by one internal medicine outpatient clinic were compared between predominantly urban and predominantly rural counties and between richer and poorer counties. Our study included only GP teams and outpatient clinics under the contract with the Croatian Institute for Health Insurance. Data on physicians were collected from the Ministry of Health and Social Welfare, the Croatian Institute for Health Insurance, the Croatian Institute for Public Health, and the Croatian Medical Chamber. Data on the contracts with the Croatian Institute for Health Insurance and health care services provided under these contracts were obtained from the database of the Institute, while population and gross domestic product data were obtained from the Database of the Croatian Institute for Statistics. World Health Organization Health for All Database was used for the international comparison of physician's data. There was no significant difference in the total number of physicians per 100,000 inhabitants between predominantly urban and predominantly rural counties (206.9+/-41.0 vs 175.4+/-30.3; P=0.067, t test) nor between richer and poorer counties (194.5+/-49.8 vs 187.7+/-25.3; P=0.703, t test). However, there were significantly fewer GPs per 100,000 inhabitants in rural than urban counties (49.0+/-5.5 vs 56.7+/-4.6; P=0.003, t test). GPs in rural counties had more insurants than those working in urban counties (1.749.8+/-172.8 vs 1.540.7+/-106.3; P=0.004, t test). The working week of specialists in the four observed specialties in hospitals was longer than the recommended 48 hours a week. The lack of physicians, especially in primary health care can lead to a reduced access to health care and increased workload of physicians, predominantly in rural counties, regardless of the counties' GDP.
Brownfield Action III - Modular use of hydrogeology instruction in the virtual classroom
NASA Astrophysics Data System (ADS)
Bower, P.; Liddicoat, J.
2009-04-01
Brownfield Action III (BA III) is a network-based, interactive, digital space and simulation developed by Barnard College and the Columbia Center for New Media Teaching and Learning in which students explore and solve problems in environmental forensics. BA III is a proven inquiry-based approach to teaching and learning that, since its inception in 1999, has been recognized as an exemplary curriculum. Indeed, in 2002 it was selected as a national model curriculum by SENCER (Science Education for New Civic Engagements and Responsibilities). BA III provides instruction in environmental site assessments and in the remediation of former industrial sites (brownfields) for secondary and higher education students. The initial full-semester, three hours of weekly laboratory instruction that complements lectures in BA II has been revised for modular use in Hydrology, Environmental Science, and Environmental Ethics undergraduate and graduate courses in the United States. The remediation of brownfields is important because they have potential as recreational, residential, and commercial real estate sites. As part of determining the value of such a site, an environmental site assessment (ESA) is required to determine the nature and extent of any contamination. To reach that objective, BA III contains a narrative that is embedded and to be discovered in simulation; it is a story of groundwater contamination complete with underground contaminant plumes in a fictitious town with buildings, roads, wells, water tower, homes, and businesses as well as a municipal government with relevant historical documents. Student companies work collaboratively in teams of two, sign a contract with a development corporation to conduct a Phase One ESA, receive a realistic budget, and compete with other teams to fulfill the contract while maximizing profit. To reach a valid conclusion in the form of a professional-level ESA and 3-D maps of the physical site, teams construct a detailed narrative from diverse forms of information, including socio-historical and a scientific dataset comprised of over 2,000,000 data points. BA III forces students to act on their perceptions of the interlocking realms of knowledge, theory and practical experience, providing an opportunity for them to gain valuable practice at tackling the complexity and ambiguity of a large-scale, interdisciplinary investigation of groundwater contamination and environmental forensics.
Advanced Stirling Convertor (ASC) Development for NASA RPS
NASA Technical Reports Server (NTRS)
Wong, Wayne A.; Wilson, Scott; Collins, Josh
2014-01-01
Sunpower's Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center (GRC) and after a series of successful demonstrations, the ASC began transitioning from a technology development project to flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the U.S. In recent years, the ASC became part of the NASA-Department of Energy Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASC convertors, one with the Department of Energy/Lockheed Martin to produce the ASC-F flight convertors, and one with NASA GRC for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flight-like ASC-E3 by 2013. However, in late Fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at GRC, plans for continued ASC production at Sunpower, and status of Stirling technology development.
Transitioning from conceptual design to construction performance specification
NASA Astrophysics Data System (ADS)
Jeffers, Paul; Warner, Mark; Craig, Simon; Hubbard, Robert; Marshall, Heather
2012-09-01
On successful completion of a conceptual design review by a funding agency or customer, there is a transition phase before construction contracts can be placed. The nature of this transition phase depends on the Project's approach to construction and the particular subsystem being considered. There are generically two approaches; project retention of design authority and issuance of build to print contracts, or issuance of subsystem performance specifications with controlled interfaces. This paper relates to the latter where a proof of concept (conceptual or reference design) is translated into performance based sub-system specifications for competitive tender. This translation is not a straightforward process and there are a number of different issues to consider in the process. This paper deals with primarily the Telescope mount and Enclosure subsystems. The main subjects considered in this paper are: • Typical status of design at Conceptual Design Review compared with the desired status of Specifications and Interface Control Documents at Request for Quotation. • Options for capture and tracking of system requirements flow down from science / operating requirements and sub-system requirements, and functional requirements derived from reference design. • Requirements that may come specifically from the contracting approach. • Methods for effective use of reference design work without compromising a performance based specification. • Management of project team's expectation relating to design. • Effects on cost estimates from reference design to actual. This paper is based on experience and lessons learned through this process on both the VISTA and the ATST projects.
Dominica Hurricane Damage Mapped by NASA's ARIA Team
2017-09-29
The Advanced Rapid Imaging and Analysis (ARIA) team at NASA's Jet Propulsion Laboratory in Pasadena, California, and Caltech, also in Pasadena, created this Damage Proxy Map (DPM) depicting areas including the Commonwealth of Dominica, that are likely damaged (shown by red and yellow pixels) as a result of Hurricane Maria (a Category 5 storm at landfall in Dominica on Sept. 18, 2017). The map is derived from synthetic aperture radar (SAR) images from the Copernicus Sentinel-1 satellites, operated by the European Space Agency (ESA). The images were taken before (March 27, 2017) and after (Sept. 23, 2017) the landfall of the storm. The map covers the area within the large red polygon, which measures 53 by 106 miles (85 by 170 kilometers). Each pixel measures about 98 feet (30 meters) across. The color variation from yellow to red indicates increasingly more significant ground surface change. Preliminary validation was done by comparing the data to a crowdsourced map by Clemson Center for Geospatial Technologies and optical satellite imagery feom DigitalGlobe. This damage proxy map should be used as guidance to identify damaged areas, and may be less reliable over vegetated areas. Sentinel-1 data were accessed through the Copernicus Open Access Hub. The image contains modified Copernicus Sentinel data (2017), processed by ESA and analyzed by the NASA/JPL-Caltech ARIA team. This research was carried out at JPL under a contract with NASA. https://photojournal.jpl.nasa.gov/catalog/PIA22037
NASA Astrophysics Data System (ADS)
Stroeve, Julienne; Jenouvrier, Stephanie
2016-04-01
Sea ice variability within the marginal ice zone (MIZ) and polynyas plays an important role for phytoplankton productivity and krill abundance. Therefore mapping their spatial extent, seasonal and interannual variability is essential for understanding how current and future changes in these biological active regions may impact the Antarctic marine ecosystem. Knowledge of the distribution of different ice types to the total Antarctic sea ice cover may also help to shed light on the factors contributing towards recent expansion of the Antarctic ice cover in some regions and contraction in others. The long-term passive microwave satellite data record provides the longest and most consistent data record for assessing different ice types. However, estimates of the amount of MIZ, consolidated pack ice and polynyas depends strongly on what sea ice algorithm is used. This study uses two popular passive microwave sea ice algorithms, the NASA Team and Bootstrap to evaluate the distribution and variability in the MIZ, the consolidated pack ice and coastal polynyas. Results reveal the NASA Team algorithm has on average twice the MIZ and half the consolidated pack ice area as the Bootstrap algorithm. Polynya area is also larger in the NASA Team algorithm, and the timing of maximum polynya area may differ by as much as 5 months between algorithms. These differences lead to different relationships between sea ice characteristics and biological processes, as illustrated here with the breeding success of an Antarctic seabird.
Scientific Investigation of the Jovian System: the Jupiter System Observer Mission Concept
NASA Astrophysics Data System (ADS)
Spilker, Thomas R.; Senske, D. A.; Prockter, L.; Kwok, J. H.; Tan-Wang, G. H.; SDT, JSO
2007-10-01
NASA's Science Mission Directorate (SMD), in efforts to start an outer solar system flagship mission in the near future, commissioned studies of mission concepts for four high-priority outer solar system destinations: Europa, the Jovian system, Titan, and Enceladus. Our team has identified and evaluated science and mission architectures to investigate major elements of the Jovian system: Jupiter, the Galilean moons, rings, and magnetosphere, and their interactions. SMD dubbed the mission concept the "Jupiter System Observer (JSO)." At abstract submission this JPL-led study is nearly complete, with final report submission in August 2007. SMD intends to select a subset of these four concepts for additional detailed study, leading to a potential flagship mission new start. A rich set of science objectives that JSO can address quite well have been identified. The highly capable science payload (including 50-cm optic), an extensive tour with multiple close flybys of Io, Europa, Ganymede and Callisto, and a significant time in orbit at Ganymede, addresses a large set of Solar System Exploration Decadal Survey (2003) and NASA Solar System Exploration Roadmap (2006) high-priority objectives. With the engineering team, the Science Definition Team evaluated a suite of mission architectures and the science they enable to arrive at two architectures that provide the best science for their estimated mission costs. This paper discusses the science objectives and operational capabilities and considerations for these mission concepts. This work was performed at JPL, APL, and other institutions under contract to NASA.
Asset management in theory and practice.
Mace, J D
1998-01-01
Managing capital-intensive imaging environments continues to be a challenge for nearly all administrators. Asset management, the strategic management of equipment inventory, must include planning, assessment, procurement, utilization review, maintenance, repair and disposal of equipment to reduce costs and improve efficiency. It must involve some shared risk between the facility and the provider, whether an original equipment manufacturer (OEM) or independent service organization (ISO). An absence of risk in the arrangement implies the provider is offering service management or consulting. A case study reports on three hospitals in the OhioHealth system. Their immediate goal, as they began to investigate asset management: cut costs immediately. A cross-functional team from the three hospitals began its investigation of various options, including working with ISOs, OEMs and development of inhouse clinical engineering. After developing a process to evaluate vendors, the team was able to score each against their cost-reduction potential, quality and implementation skills. The team narrowed its selection quickly to two multivendor service providers. An initial contract guaranteed savings of 20 percent of the annual budget, with a projected two to five percent additional savings. OEM relationships were moved to a time-and-materials basis, and ISOs were used in selected areas. In addition, the internal inhouse clinical engineering services group was moved into a "first call" approach in some areas. That expanded role resulted in savings and improved response time. The process, although not without its problems, was viewed favorably overall.
]Space Shuttle Independent Assessment Team
NASA Technical Reports Server (NTRS)
2000-01-01
The Shuttle program is one of the most complex engineering activities undertaken anywhere in the world at the present time. The Space Shuttle Independent Assessment Team (SIAT) was chartered in September 1999 by NASA to provide an independent review of the Space Shuttle sub-systems and maintenance practices. During the period from October through December 1999, the team led by Dr. McDonald and comprised of NASA, contractor, and DOD experts reviewed NASA practices, Space Shuffle anomalies, as well as civilian and military aerospace experience. In performing the review, much of a very positive nature was observed by the SIAT, not the least of which was the skill and dedication of the workforce. It is in the unfortunate nature of this type of review that the very positive elements are either not mentioned or dwelt upon. This very complex program has undergone a massive change in structure in the last few years with the transition to a slimmed down, contractor-run operation, the Shuttle Flight Operations Contract (SFOC). This has been accomplished with significant cost savings and without a major incident. This report has identified significant problems that must be addressed to maintain an effective program. These problems are described in each of the Issues, Findings or Observations summarized, and unless noted, appear to be systemic in nature and not confined to any one Shuttle sub-system or element. Specifics are given in the body of the report, along with recommendations to improve the present systems.
An Illustrated Overview of the Origins and Development of the QSCP Meetings
NASA Astrophysics Data System (ADS)
Maruani, Jean
The origins and development of the QSCP meetings are recalled: from a congress organized in Paris in 1986 to honour Prof. Raymond Daudel, through Franco-Bulgarian cooperation between various teams then European contracts, in the frame of COST projects, involving a network of French, Spanish, British, Italian, Swedish, and Bulgarian scientists, till the holding of the first QSCP workshop near Pisa in 1996 to honour Prof. Stefan Christov. After that there was a meeting every year, always with proceedings published. This historical overview will be presented as an illustrated journey in picturesque cities of Western and Eastern Europe, North Africa, and North America, sprinkled with historical or philosophical anecdotes and insights.
NASA Astrophysics Data System (ADS)
Wu, Xueke; Li, Huidong; Wang, Zhanhui; Feng, Hao; Zhou, Yulin
2017-06-01
Not Available Project supported by the National Natural Science Foundation for Young Scientists of China (Grant No. 11605143), the Undergraduate Training Programs for Innovation and Entrepreneurship of Sichuan Province, China (Grant No. 05020732), the National Natural Science Foundation of China (Grant No. 11575055), the Fund from the Department of Education in Sichuan Province of China (Grant No. 15ZB0129), the China National Magnetic Confinement Fusion Science Program (Grant No. 2013GB107001), the National ITER Program of China (Contract No. 2014GB113000), and the Funds of the Youth Innovation Team of Science and Technology in Sichuan Province of China (Grant No. 2014TD0023).
NASA Technical Reports Server (NTRS)
1977-01-01
Children with cerebral palsy have nervous system defects which lead to muscular spasticity and loss of coordination. Many of these children have great difficulty walking because certain muscles are in a constant state of contraction. Surgical techniques can lengthen muscles or tendons to improve the child's walking pattern, but it is vital to diagnose accurately the particular spasticity problem of each patient; the individual muscles causing the handicap vary greatly from child to child. It is difficult by physical examination alone to determine precisely which muscle groups are most involved. Biotelemetry has provided a solution. For the past two years, the Children's Hospital at Standord, assisted by NASA and the Stanford Biomedical Application Team, has been applying biotelemetry to the cerebral palsy problem.
Streamlining: Reducing costs and increasing STS operations effectiveness
NASA Technical Reports Server (NTRS)
Petersburg, R. K.
1985-01-01
The development of streamlining as a concept, its inclusion in the space transportation system engineering and operations support (STSEOS) contract, and how it serves as an incentive to management and technical support personnel is discussed. The mechanics of encouraging and processing streamlining suggestions, reviews, feedback to submitters, recognition, and how individual employee performance evaluations are used to motivation are discussed. Several items that were implemented are mentioned. Information reported and the methodology of determining estimated dollar savings are outlined. The overall effect of this activity on the ability of the McDonnell Douglas flight preparation and mission operations team to support a rapidly increasing flight rate without a proportional increase in cost is illustrated.
A Data Scheduling and Management Infrastructure for the TEAM Network
NASA Astrophysics Data System (ADS)
Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.
2009-04-01
The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. Climate Protocol The Climate Protocol entails the collection of climate data via meteorological stations located at the TEAM Sites. This includes information such as precipitation, temperature, wind direction and strength and various solar radiation measurements. Vegetation Protocol The Vegetation Protocol collects standardized information on tropical forest trees and lianas. A TEAM Site will have between 6-9 1ha plots where trees and lianas larger than a pre-specified size are mapped, identified and measured. This results in each TEAM Site repeatedly measuring between 3000-5000 trees annually. Terrestrial Vertebrate Protocol The Terrestrial Vertebrate Protocol collects standardized information on mid-sized tropical forest fauna (i.e. birds and mammals). This information is collected via camera traps (i.e. digital cameras with motion sensors housed in weather proof casings). The images taken by the camera trap are reviewed to identify what species are captured in the image by the camera trap. The image and the interpretation of what is in the image are the data for the Terrestrial Vertebrate Protocol. The amount of data collected through the TEAM protocols provides a significant yet exciting IT challenge. The TEAM Network is currently partnering with the San Diego Super Computer Center to build the data management infrastructure. Data collected from the three core protocols as well as others are currently made available through the TEAM Network portal, which provides the content management framework, the data scheduling and management framework, an administrative framework to implement and manage TEAM sites, collaborative tools and a number of tools and applications utilizing Google Map and Google Earth products. A critical element of the TEAM Network data management infrastructure is to make the data publicly available in as close to real-time as possible (the TEAM Network Data Use Policy: http://www.teamnetwork.org/en/data/policy). This requires two essential tasks to be accomplished, 1) A data collection schedule has to be planned, proposed and approved for a given TEAM site. This is a challenging process since TEAM sites are geographically distributed across the tropics and hence have different seasons where they schedule field sampling for the different TEAM protocols. Capturing this information and ensuring that TEAM sites follow the outlined legal contract is key to the data collection process and 2) A stream-lined and efficient information management system to ensure data collected from the field meet the minimum data standards (i.e. are of the highest scientific quality) and are securely transferred, archived, processed and be rapidly made publicaly available, as a finished consumable product via the TEAM Network portal. The TEAM Network is achieving these goals by implementing an end-to-end framework consisting of the Sampling Scheduler application and the Data Management Framework. Sampling Scheduler The Sampling Scheduler is a project management, calendar based portal application that will allow scientists at a TEAM site to schedule field sampling for each of the TEAM protocols implemented at that site. The sampling scheduler addresses the specific requirements established in the TEAM protocols with the logistical scheduling needs of each TEAM Site. For example, each TEAM protocol defines when data must be collected (e.g. time of day, number of times per year, during which seasons, etc) as well as where data must be collected (from which sampling units, which trees, etc). Each TEAM Site has a limited number of resources and must create plans that will both satisfy the requirements of the protocols as well as be logistically feasible for their TEAM Site. With 15 TEAM Sites (and many more coming soon) the schedules of each TEAM Site must be communicated to the Network Office to ensure data are being collected as scheduled and to address the many problems when working in difficult environments like Tropical Forests. The Sampling Schedule provides built-in proposal and approval functionality to ensure that the TEAM Sites are and the Network office are in sync as well as provides the capability to modify schedules when needed. The Data Management Framework The Data Management framework is a three-tier data ingestion, edit and review application for protocols defined in the TEAM network. The data ingestion framework provides online web forms for field personnel to submit and edit data collected at TEAM Sites. These web forms will be accessible from the TEAM content management site. Once the data is securely uploaded, cured, processed and approved, it will be made publicly available for consumption by the scientific community. The Data Management framework, when combined with the Sampling Scheduler provides a closed loop Data Scheduling and Management infrastructure. All information starting from data collection plan, tools to input, modify and curate data, review and run QA/QC tests, as well as verify data are collected as planed are included. Finally, TEAM Network data are available for download via the Data Query and Download Application. This application utilizes a Google Maps custom interface to search, visualize, and download TEAM Network data. References • TEAM Network, http://www.teamnetwork.org • Center for Applied Biodiversity Science, Conservation International. http://science.conservation.org/portal/server.pt • TEAM Data Query and Download Application, http://www.teamnetwork.org/en/data/query
Goodman, Annekathryn; Black, Lynn; Briggs, Susan
2014-01-01
Natural disasters disproportionately injure women and children. Disaster teams need intensive training in the management of obstetrics and women's healthcare at the disaster site. This article summarizes the obstetrical experience for the International Medical Surgical Response Team (IMSuRT) stationed at Gheskio in Port Au Prince during the first 2 weeks after the 2010 Haitian earthquake. The world's literature on the impact of disasters on women is reviewed. Sixty-three members of the IMSuRT and Disaster Medical Assistance Team set up a mobile surgical field hospital after the 2010 Haitian earthquake. One member (AG) managed all the obstetrical care and taught the other team members essentials of labor management and assessment in pregnancy. Six hundred patients were treated in the first 14 days. Ten percent of these patients were pregnant.There were 12 deliveries. All pregnant patients were evaluated by a Sonosite ultrasound device. Pregnant patients with earthquake-related injuries were treated for their injuries.Women in labor were managed by active management in labor. No cesarean sections were needed. Well-being of mother and babies. Sixty pregnant women presented to the mobile hospital for evaluation from January 17, 2010, through January 28, 2012. Twelve women in labor delivered healthy infants by vaginal delivery. Gestational ages ranges from 34 to 40 weeks. Active management of labor included the use of intravenous Pitocin, which was titrated to contractions. Duration of labor ranged from 2 to 12 hours. Three team members participated in each delivery. Two women were discharged on the same day as their deliveries. Eight women were discharged on the first postpartum day and two on the second postpartum day. Pregnant women suffered severe injuries. Additionally, pregnant women with pre-existing medical conditions were treated after the earthquake. Active management of labor allowed all women to deliver vaginally. The labor management required tremendous team resources to facilitate vaginal deliveries and avoid cesarean sections. Cesarean sections in an austere environment have the potential for devastating consequences such as sepsis, wound dehiscence, and the long-term risks of uterine rupture with subsequent pregnancies. Our experience highlights the need to include trained obstetrical providers on the first response team. Data from this article were included in the presentation, "An urgent need for women's health specialists in disaster response," at the Disaster Response Workshop, Annual Meeting Society Maternal Fetal Medicine, Dallas, 2012.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriikku, E. M.; Hera, K. R.; Marzolf, A. D.
The Nuclear Material Disposition Project group asked the Savannah River National Lab (SRNL) Research and Development Engineering (R&DE) department to help procure, test, and deploy a remote crawler to recover the 2014 Inspection Crawler (IC) that tipped over in the H-Canyon Air Exhaust Tunnel. R&DE wrote a Procurement Specification for a Recovery Crawler (RC) and SRNS Procurement Department awarded the contract to Power Equipment Manufacturing Inc. (PEM). The PEM RC was based on their standard sewer inspection crawler with custom arms and forks added to the front. The arms and forks would be used to upright the 2014 Inspection Crawler.more » PEM delivered the RC and associated cable reel, 2014 Inspection Crawler mockup, and manuals in late April 2015. R&DE and the team tested the crawler in May of 2015 and made modifications based on test results and Savannah River Site (SRS) requirements. R&DE delivered the RC to H-Area at the end of May. The team deployed the RC on June 9, 10, and 11, 2015 in the H-Canyon Air Exhaust Tunnel. The RC struggled with some obstacles in the tunnel, but eventually made it to the IC. The team spent approximately five hours working to upright the IC and eventually got it on its wheels. The IC travelled approximately 20 feet and struggled to drive over debris on the air tunnel floor. Unfortunately the IC tripped over trying to pass this obstacle. The team decided to leave the IC in this location and inspect the tunnel with the RC. The RC passed the IC and inspected the tunnel as it travelled toward H-Canyon. The team turned the RC around when it was about 20 feet from the H-Canyon crossover tunnel. From that point, the team drove the RC past the manway towards the new sand filter and stopped approximately 20 feet from the new sand filter. The team removed the RC from the tunnel, decontaminated the RC, and stored it the manway building, 294-2H. The RC deployment confirmed the IC was not in a condition to perform useful tunnel inspections and would require significant maintenance to become inspection ready. The RC traveled approximately 660 feet in the tunnel and viewed the tunnel and ceiling wall surfaces that were not blocked by existing ducts. This deployment also documented the tunnel obstacles for future inspections. Overall, the RC deployment was a success.« less
Financial and clinical risk in health care reform: a view from below.
Smith, Pam; Mackintosh, Maureen; Ross, Fiona; Clayton, Julie; Price, Linnie; Christian, Sara; Byng, Richard; Allan, Helen
2012-04-01
This paper examines how the interaction between financial and clinical risk at two critical phases of health care reform in England has been experienced by frontline staff caring for vulnerable patients with long term conditions. The paper draws on contracting theory and two interdisciplinary and in-depth qualitative research studies undertaken in 1995 and 2007. Methods common to both studies included documentary analysis and interviews with managers and front line professionals. The 1995 study employed action-based research and included observation of community care; the 2007 study used realistic evaluation and included engagement with service user groups. In both reform processes, financial risk was increasingly devolved to frontline practitioners and smaller organizational units such as GP commissioning groups, with payment by unit of activity, aimed at changing professionals' behaviour. This financing increased perceived clinical risk and fragmented the delivery of health and social care services requiring staff efforts to improve collaboration and integration, and created some perverse incentives and staff demoralisation. Health services reform should only shift financial risk to frontline professionals to the extent that it can be efficiently borne. Where team work is required, contracts should reward collaborative multi-professional activity.
The Great Observatories Origins Deep Survey (GOODS) Spitzer Legacy Science Program
NASA Astrophysics Data System (ADS)
Dickinson, M.; GOODS Team
2004-12-01
The Great Observatories Origins Deep Survey (GOODS) is an anthology of observing programs that are creating a rich, public, multiwavelength data set for studying galaxy formation and evolution. GOODS is observing two fields, one in each hemisphere, with extremely deep imaging and spectroscopy using the most powerful telescopes in space and on the ground. The GOODS Spitzer Legacy Science Program completes the trio of observations from NASA's Great Observatories, joining already-completed GOODS data from Chandra and Hubble. Barring unforeseen difficulties, the GOODS Spitzer observing program will have been completed by the end of 2004, and the first data products will have been released to the astronomical community. In this Special Oral Session, and in an accompanying poster session, the GOODS team presents early scientific results from this Spitzer Legacy program, as well as new research based on other GOODS data sets. I will introduce the session with a brief description of the Legacy observations and data set. Support for this work, part of the Spitzer Space Telescope Legacy Science Program, was provided by NASA through Contract Number 1224666 issued by the Jet Propulsion Laboratory, California Institute of Technology under NASA contract 1407.
Web-based document and content management with off-the-shelf software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schuster, J
1999-03-18
This, then, is the current status of the project: Since we made the switch to Intradoc, we are now treating the project as a document and image management system. In reality, it could be considered a document and content management system since we can manage almost any file input to the system such as video or audio. At present, however, we are concentrating on images. As mentioned above, my CRADA funding was only targeted at including thumbnails of images in Intradoc. We still had to modify Intradoc so that it would compress images submitted to the system. All processing ofmore » files submitted to Intradoc is handled in what is called the Document Refinery. Even though MrSID created thumbnails in the process of compressing an image, work needed to be done to somehow build this capability into the Document Refinery. Therefore we made the decision to contract the Intradoc Engineering Team to perform this custom development work. To make Intradoc even more capable of handling images, we have also contracted for customization of the Document Refinery to accept Adobe PhotoShop and Illustrator file in their native format.« less
Advanced Stirling Convertor (ASC) - From Technology Development to Future Flight Product
NASA Technical Reports Server (NTRS)
Wong, Wayne A.; Wood, J. Gary; Wilson, Kyle
2008-01-01
The Advanced Stirling Convertor (ASC) is being developed by Sunpower, Inc. under contract to NASA s Glenn Research Center (GRC) with critical technology support tasks lead by GRC. The ASC development, funded by NASA s Science Mission Directorate, started in 2003 as one of 10 competitively awarded contracts that were to address future Radioisotope Power System (RPS) advanced power conversion needs. The ASC technology has since evolved through progressive convertor builds and successful testing to demonstrate high conversion efficiency (38 %), low mass (1.3 kg), hermetic sealing, launch vibration simulation, EMI characterization, and is undergoing extended operation. The GRC and Sunpower team recently delivered three ASC-E machines to the Department of Energy (DOE) and Lockheed Martin Space Systems Company, two units for integration onto the Advanced Stirling Radioisotope Generator Engineering Unit (ASRG EU) plus one spare. The design has recently been initiated for the ASC-E2, an evolution from the ASC-E that substitutes higher temperature materials enabling improved performance and higher reliability margins. This paper summarizes the history and status of the ASC project and discusses plans for this technology which enables RPS specific power of 8 W/kg for future NASA missions.
Bristow, Claire C; Podewils, Laura Jean; Bronner, Liza Ellen; Bantubani, Nonkqubela; Walt, Martie van der; Peters, Annatjie; Mametja, David
2013-09-04
In 2008-2009 the South African National Tuberculosis (TB) Program (NTP) implemented a national pilot project, the TB Tracer Project, aiming to decrease default rates and improve patient outcomes. The current study aimed to inform the NTP by describing the knowledge, attitudes, and practices of TB program personnel involved with tracing activities. A self-administered written questionnaire was sent to TB staff, managers and tracer team leaders to assess basic TB knowledge, attitudes and practices. Descriptive statistics were used to summarize results and the chi-squared statistic was used to compare responses of staff at facilities that participated in the TB Tracer Project (tracer) and those that followed standard NTP care (non-tracer). Of 560 total questionnaires distributed, 270 were completed and returned (response rate 48%). Total TB knowledge ranged from 70.8-86.3% correct across all response groups. However, just over half (range 50-59.3%) of each respondent group was able to correctly identify the four components of a DOT encounter. A patient no longer feeling sick was cited by 72.1% of respondents as the reason patients fail to adhere to treatment. Tracer teams were viewed as an effective means to get patients to return to treatment by 96.3% of health facility level respondents. Tracer team leaders reported concerns including lack of logistical support (41.7%), insufficient physical safety precautions (41.7%), and inadequate protection from contracting TB (39.1%). Upon patients returning to treatment at the clinic, facilities included in the TB Tracer Project were significantly more likely to discuss alternate DOTS arrangements than non-tracer facilities (79.2 vs. 66.4%, p = 0.03). This study identified key components of knowledge, attitudes, and practices regarding TB patient tracing activities in South Africa. Educating patients on the essential need to complete treatment irrespective of clinical symptoms may help improve treatment adherence. Future scale-up and integration of TB tracing activities as part of standard TB management should include provisions for standardized training of personnel on the critical elements of DOTS, and for ensuring appropriate supervision, logistical support, and physical safety and TB transmission protection of tracing teams.
Test, Control and Monitor System maintenance plan
NASA Technical Reports Server (NTRS)
Buehler, David P.; Lougheed, M. J.
1993-01-01
The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.
Achieving Operability via the Mission System Paradigm
NASA Technical Reports Server (NTRS)
Hammer, Fred J.; Kahr, Joseph R.
2006-01-01
In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.
NASA Astrophysics Data System (ADS)
Pohlman, Nicholas A.; Hynes, Eric; Kutz, April
2015-11-01
Lectures in introductory fluid mechanics at NIU are a combination of students with standard enrollment and students seeking honors credit for an enriching experience. Most honors students dread the additional homework problems or an extra paper assigned by the instructor. During the past three years, honors students of my class have instead collaborated to design wet-lab experiments for their peers to predict variable volume flow rates of open reservoirs driven by gravity. Rather than learn extra, the honors students learn the Bernoulli head-loss equation earlier to design appropriate systems for an experimental wet lab. Prior designs incorporated minor loss features such as sudden contraction or multiple unions and valves. The honors students from Spring 2015 expanded the repertoire of available options by developing large scale set-ups with multiple pipe networks that could be combined together to test the flexibility of the student team's computational programs. The engagement of bridging the theory with practice was appreciated by all of the students such that multiple teams were able to predict performance within 4% accuracy. The challenges, schedules, and cost estimates of incorporating the experimental lab into an introductory fluid mechanics course will be reported.
NASA Technical Reports Server (NTRS)
Salomonson, Vincent V.
1991-01-01
The Moderate Resolution Imaging Spectrometer (MODIS) is a key observing facility to be flown on the Earth Observing System (EOS). The facility is composed of two instruments called MODIS-N (nadir) and MODIS-T (tilt). The MODIS-N is being built under contract to NASA by the Santa Barbara Research Center. The MODIS-T is being fabricated by the Engineering Directorate at the Goddard Space Flight Center. The MODIS Science Team has defined nearly 40 biogeophysical data products for studies of the ocean and land surface and properties of the atmosphere including clouds that can be expected to be produced from the MODIS instruments shortly after the launch of EOS. The ocean, land, atmosphere, and calibration groups of the MODIS Science Team are now proceeding to plan and implement the operations and facilities involving the analysis of data from existing spaceborne, airborne, and in-situ sensors required to develop and validate the algorithms that will produce the geophysical data products. These algorithm development and validation efforts will be accomplished wherever possible within the context of existing or planned national and international experiments or programs such as those in the World Climate Research Program.
1996 Coolant Flow Management Workshop
NASA Technical Reports Server (NTRS)
Hippensteele, Steven A. (Editor)
1997-01-01
The following compilation of documents includes a list of the 66 attendees, a copy of the viewgraphs presented, and a summary of the discussions held after each session at the 1996 Coolant Flow Management Workshop held at the Ohio Aerospace Institute, adjacent to the NASA Lewis Research Center, Cleveland, Ohio on December 12-13, 1996. The workshop was organized by H. Joseph Gladden and Steven A. Hippensteele of NASA Lewis Research Center. Participants in this workshop included Coolant Flow Management team members from NASA Lewis, their support service contractors, the turbine engine companies, and the universities. The participants were involved with research projects, contracts and grants relating to: (1) details of turbine internal passages, (2) computational film cooling capabilities, and (3) the effects of heat transfer on both sides. The purpose of the workshop was to assemble the team members, along with others who work in gas turbine cooling research, to discuss needed research and recommend approaches that can be incorporated into the Center's Coolant Flow Management program. The workshop was divided into three sessions: (1) Internal Coolant Passage Presentations, (2) Film Cooling Presentations, and (3) Coolant Flow Integration and Optimization. Following each session there was a group discussion period.
Christ, Oliver; van Dick, Rolf; Wagner, Ulrich; Stellmacher, Jost
2003-09-01
Psychological variables should play an important role in determining teachers' involvement in behaviours not directly or formally forced by contracts. Organisational identification as proposed from the Social Identity Approach is examined as a possible determinant of organisational citizenship behaviour (OCB) among schoolteachers. The aim of the present study was to explore the relationships between different foci of organisational identification and different forms of OCB in schools. Data sets of altogether 447 German school teachers who filled in all relevant items in a cross-sectional questionnaire are used for analyses in the present study. Standardised questionnaires measuring organisational identification and OCB were administered. Exploratory and confirmatory factor analyses revealed the proposed foci of identification (i.e., career identification, team identification, and organisational identification), as well as different forms of OCB (i.e., OCB towards the own qualification, towards the team, and towards the organisation). Structural equation modelling supports the main hypothesis that foci of identification relate differentially to forms of OCB. The results emphasise the importance of organisational identification as a determinant of OCB in schools. Practical implications are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henry, C.P.; Marsh, E.J.
1997-06-01
In 1990, the Governor of New York State issued Executive Order No. 132, directing all state agencies to reduce energy consumption by 20% from the base year of 1988/89 by the year 2000. To assist in meeting this goal, the New York State Office of Mental Health (OMH) established the Lighting Revitalization Program in 1992. State facilities are divided into five regions, each served by existing Environmental Revitalization Teams. OMH supplemented these teams with lighting technicians in this new program. The program`s goal was to rehabilitate outdated, inefficient lighting systems throughout 28 OMH facilities, totaling 28 million square feet inmore » area. OMH requested the former Facility Development Corporation (FDC), now the Dormitory Authority of the State of New York (DASNY), to contract with Novus Engineering to evaluate the relative efficiency of T8 and T12 ballasts. Novus contracted an independent laboratory, Eastern Testing Laboratories (ETL), for performance testing. ETL tested four ballast/lamp configurations for light Output and input power, and Novus analyzed the results for relative efficiency and also calculated 25-year life cycle costs. The test results indicated that the efficiencies of the T12/34W and T8/32W ballast/lamp technologies were nearly identical. The input power and light output of these systems were similar. The lumens per Watt ratings for the two systems were nearly equal, with the T8 technology being only about two percent more efficient, generating more light with similar input power. The life cycle costs for the two systems were nearly identical, with the T12 system providing a slightly lower life cycle cost. Given the above considerations, the agency has been installing T12 electronic ballasts and 34W lamps in buildings where fluorescent fixtures warranted upgrading. This type of retrofit goes against current trends, but the use of T8 system could not be justified in buildings undergoing minor retrofitting.« less
Management of complex abdominal wall defects associated with penetrating abdominal trauma.
Arul, G Suren; Sonka, B J; Lundy, J B; Rickard, R F; Jeffery, S L A
2015-03-01
The paradigm of Damage Control Surgery (DCS) has radically improved the management of abdominal trauma, but less well described are the options for managing the abdominal wall itself in an austere environment. This article describes a series of patients with complex abdominal wall problems managed at the UK-led Role 3 Medical Treatment Facility (MTF) in Camp Bastion, Afghanistan. Contemporaneous review of a series of patients with complex abdominal wall injuries who presented to the Role 3 MTF between July and November 2012. Five patients with penetrating abdominal trauma associated with significant damage to the abdominal wall were included. All patients were managed using DCS principles, leaving the abdominal wall open at the end of the first procedure. Subsequent management of the abdominal wall was determined by a multidisciplinary team of general and plastic surgeons, intensivists and specialist nurses. The principles of management identified included minimising tissue loss on initial laparotomy by joining adjacent wounds and marginal debridement of dead tissue; contraction of the abdominal wall was minimised by using topical negative pressure dressing and dermal-holding sutures. Definitive closure was timed to allow oedema to settle and sepsis to be controlled. Closure techniques include delayed primary closure with traction sutures, components separation, and mesh closure with skin grafting. A daily multidisciplinary team discussion was invaluable for optimal decision making regarding the most appropriate means of abdominal closure. Dermal-holding sutures were particularly useful in preventing myostatic contraction of the abdominal wall. A simple flow chart was developed to aid decision making in these patients. This flow chart may prove especially useful in a resource-limited environment in which returning months or years later for closure of a large ventral hernia may not be possible. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Mental Fatigue and Spatial References Impair Soccer Players' Physical and Tactical Performances
Coutinho, Diogo; Gonçalves, Bruno; Travassos, Bruno; Wong, Del P.; Coutts, Aaron J.; Sampaio, Jaime E
2017-01-01
This study examined the effects of mental fatigue and additional corridor and pitch sector lines on players' physical and tactical performances during soccer small-sided games. Twelve youth players performed four Gk+6vs6+Gk small-sided games. Prior to the game, one team performed a motor coordination task to induce mental fatigue, while the other one performed a control task. A repeated measures design allowed to compare players' performances across four conditions: (a) with mental fatigue against opponents without mental fatigue in a normal pitch (MEN), (b) with mental fatigue on a pitch with additional reference lines (#MEN); (c) without mental fatigue against mentally fatigued opponents on a normal pitch (CTR); and (d) without mental fatigue on a pitch with reference lines (#CTR). Player's physical performance was assessed by the distance covered per minute and the number of accelerations and decelerations (0.5–3.0 m/s2; > −3.0 m/s2). Positional data was used to determine individual (spatial exploration index, time synchronized in longitudinal and lateral directions) and team-related variables (length, width, speed of dispersion and contraction). Unclear effects were found for the physical activity measures in most of the conditions. There was a small decrease in time spent laterally synchronized and a moderate decrease in the contraction speed when MEN compared to the CTR. Also, there was a small decrease in the time spent longitudinally synchronized during the #MEN condition compared to MEN. The results showed that mental fatigue affects the ability to use environmental information and players' positioning, while the additional reference lines may have enhanced the use of less relevant information to guide their actions during the #MEN condition. Overall, coaches could manipulate the mental fatigue and reference lines to induce variability and adaptation in young soccer players' behavior. PMID:28983273
Wye, Lesley; Brangan, Emer; Cameron, Ailsa; Gabbay, John; Klein, Jonathan H; Anthwal, Rachel; Pope, Catherine
2015-01-01
Objectives The use of external consultants from private and not-for-profit providers in the National Health Service (NHS) is intended to improve the quality of commissioning. The aim of this study was to learn about the support offered to healthcare commissioners, how external consultants and their clients work together and the perceived impact on the quality of commissioning. Setting NHS commissioning organisations and private and not-for-profit providers. Design Mixed methods case study of eight cases. Data collection 92 interviews with external consultants (n=36), their clients (n=47) and others (n=9). Observation of 25 training events and meetings. Documentation, for example, meeting minutes and reports. Analysis Constant comparison. Data were coded, summarised and analysed by the research team with a coding framework to facilitate cross-case comparison. Results In the four contracts presented here, external providers offered technical solutions (eg, software tools), outsourcing and expertise including project management, data interpretation and brokering relationships with experts. In assessing perceived impact on quality of commissioning, two contracts had limited value, one had short-term benefits and one provided short and longer term benefits. Contracts with commissioners actively learning, embedding and applying new skills were more valued. Other elements of success were: (1) addressing clearly agreed problems of relevance to managerial and operational staff (2) solutions co-produced at all organisational levels (3) external consultants working directly with clients to interpret data outputs to inform locally contextualised commissioning strategies. Without explicit knowledge exchange strategies, outsourcing commissioning to external providers resulted in the NHS clients becoming dependent. Conclusions NHS commissioning will be disadvantaged if commissioners both fail to learn in the short term from the knowledge of external providers and in the longer term lose local skills. Knowledge exchange mechanisms are a vital component of commissioning and should be embedded in external provider contracts. PMID:25716174
Advanced Stirling Convertor Development for NASA Radioisotope Power Systems
NASA Technical Reports Server (NTRS)
Wong, Wayne A.; Wilson, Scott D.; Collins, Josh
2015-01-01
Sunpower Inc.'s Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center and after a series of successful demonstrations, the ASC began transitioning from a technology development project to a flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the United States. In recent years, the ASC became part of the NASA and Department of Energy (DOE) Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASCs, one with the DOE and Lockheed Martin to produce the ASC-F flight convertors, and one with NASA Glenn for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flightlike ASC-E3 by 2013. However, in late fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high-efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at Glenn, plans for continued ASC production at Sunpower, and status of Stirling technology development.
COTS/CRS: KSC Evolving Host Initiatives with Commercial Space Partners
NASA Technical Reports Server (NTRS)
Yohpe, Megan
2010-01-01
NASA's Commercial Crew and Cargo Program Office (C3PO) leads the agency's commercial efforts to stimulate United States private companies as the shuttle program comes to a close. Through the Commercial Orbital Transportation Services (COTS) program, two companies, SpaceX and Orbital, were selected to demonstrate their ability to perform flights to the International Space Station. The Commercial Resupply Services (CRS) Project leverages off the COTS experience, and awarded these two private companies contracts to resupply the International Space Station after shuttle fly out. As a 2010 summer intern, I supported the COTS/CRS team in their team meetings, attended and contributed to project discussions and planning, and assisted in developing visual representations for the variety of processes and organizational endeavors required for the program to run smoothly. One aspect of the COTS/CRS program gives the involved private companies the opportunity to request available services from Kennedy Space Center (KSC); one of my projects included assisting in the development of a related Task Order Request (TOR) process. In addition, an integral part of the project was to maintain and enhance the team database for processing the variety of TORS. My experience in the project gave me great insight into the growing field of commercial space activities. The development of the TOR process involved coordinating representatives from a variety of backgrounds at KSC. A clear and concise visual representation of the TOR process in the form of a flow chart was necessary to successfully implement a task order request from one of NASA's commercial partners. The goals of the process charts were to communicate the team's ideas and foster a common thought process while at the same time allow the process to grow and evolve. It was critical that the requests from the private companies were addressed quickly and thoroughly as the process developed this summer is expected to have extensive future use.
The Jupiter System Observer Mission Concept: Scientific Investigation of the Jovian System
NASA Astrophysics Data System (ADS)
Spilker, T. R.; Senske, D. A.; Prockter, L.; Kwok, J. H.; Tan-Wang, G. H.; Sdt, J.
2007-12-01
NASA's Science Mission Directorate (SMD), in efforts to start an outer solar system flagship mission in the near future, commissioned studies of mission concepts for four high-priority outer solar system destinations: Europa, the Jovian system, Titan, and Enceladus. Our team has identified and evaluated science and mission architectures to investigate major elements of the Jovian system: Jupiter, the Galilean moons, rings, and magnetosphere, and their interactions. SMD dubbed the mission concept the "Jupiter System Observer (JSO)." This JPL-led study's final report is now complete and was submitted in August 2007. SMD intends to select a subset of these four concepts for additional detailed study, leading to a potential flagship mission new start. The study's NASA-appointed, multi-institutional Science Definition Team (SDT) identified a rich set of science objectives that JSO can address quite well. The highly capable science payload (including ~50-cm optics), an extensive tour with multiple close flybys of Io, Europa, Ganymede and Callisto, and a significant time in orbit at Ganymede, addresses a large set of Solar System Exploration Decadal Survey (2003) and NASA Solar System Exploration Roadmap (2006) high-priority objectives. With the engineering team, the SDT evaluated a suite of mission architectures and the science they enable to arrive at two architectures that provide the best science for their estimated mission costs. This paper discusses the science objectives and operational capabilities and considerations for these mission concepts, and some options available for emphasizing specific science objectives. This work was performed at JPL, APL, and other institutions under contract to NASA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haynes, Ray; Hirschy, Anita
On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing themore » project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)« less
Final Report for the Advanced Camera for Surveys (ACS)
NASA Technical Reports Server (NTRS)
2004-01-01
ACS was launched aboard the Space Shuttle Columbia just before dawn on March 1, 2002. At the time of liftoff, the Hubble Space Telescope (HST) was reflecting the early morning sun as it moved across the sky. After successfully docking with HST, several components were replaced. One of the components was the Advanced Camera for Surveys built by Ball Aerospace & Technologies Corp. (BATC) in Boulder, Colorado. Over the life of the HST contract at BATC, hundreds of employees had the pleasure of working on the concept, design, fabrication, assembly, and test of ACS. Those employees thank NASA - Goddard Space Flight Center and the science team at Johns Hopkins University (JHU) for the opportunity to participate in building a great science instrument for HST.
Teacher Enhancement and Preparation Programs
NASA Technical Reports Server (NTRS)
1995-01-01
These two programs provide opportunities for K-12 teachers of mathematics, science, and technology to spend two weeks at a NASA center learning about aeronautics and space. Participants are selected by peer review from a contracting agent that assists NASA in administering the program. Each teacher receives a stipend that covers the cost of travel, housing, meals, and graduate credit. NEWMAST provides for approximately 100 secondary teachers, and NEWTEST is a program designed to meet the needs of approximately 125 elementary teachers each summer. Teachers are provided with a wide variety of experiences including research laboratory observations, presentations, and 'shadowships'. Individual and team projects are used to enhance the participants knowledge of space and aeronautics and to motivate the teachers to incorporate the summer workshop activities into their classrooms.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
'Who does what' in the orthodontic workforce.
Hodge, T; Parkin, N
2015-02-16
The contraction of the economy in the United Kingdom and constraints on the National Health Service (NHS) together with new opportunities for the delivery of orthodontic treatment has resulted in an increasing number of dental personnel across the different registrant groups. This article focuses on the changes that have taken place in the orthodontic workforce over the past decade. Although others help deliver orthodontic services such as material suppliers, treatment coordinators and those involved in marketing, this article will restrict itself to informing the reader specifically about which dental registrants are doing what at the clinical interface. How health professionals have developed their skills to undertake the role they play within the team and possible threats arising because of these changes are also discussed.
Bagat, Mario; Drakulić, Velibor; Sekelj Kauzlarić, Katarina; Vlahušić, Andro; Bilić, Ivica; Matanić, Dubravka
2008-01-01
Aim To examine the association of counties’ urbanization level and gross domestic product (GDP) per capita on the access to health care. Methods Counties were divided in two groups according to the urbanization level and GDP per capita in purchasing power standards. The number of physicians per 100 000 inhabitants, the number of physicians in hospitals in four basic specialties, physicians’ workload, average duration of working week, the average number of insurants per general practice (GP) team, and the number of inhabitants covered by one internal medicine outpatient clinic were compared between predominantly urban and predominantly rural counties, and between richer and poorer counties. Our study included only GP teams and outpatients’ clinics under the contract with the Croatian Institute for Health Insurance. Data on physicians were collected from the Ministry of Health and Social Welfare, the Croatian Institute for Health Insurance, the Croatian Institute for Public Health, and the Croatian Medical Chamber. Data on the contracts with the Croatian Institute for Health Insurance and health care services provided under these contracts were obtained from the database of the Institute, while population and gross domestic product data were obtained from the Database of the Croatian Institute for Statistics. World Health Organization Health for All Database was used for the international comparison of physician’s data. Results There was no significant difference in the total number of physicians per 100 000 inhabitants between predominantly urban and predominantly rural counties (206.9 ± 41.0 vs 175.4 ± 30.3; P = 0.067, t test) nor between richer and poorer counties (194.5 ± 49.8 vs 187.7 ± 25.3; P = 0.703, t test). However, there were significantly fewer GPs per 100 000 inhabitants in rural than urban counties (49.0 ± 5.5 vs 56.7 ± 4.6; P = 0.003, t test). GPs in rural counties had more insurants than those working in urban counties (1.749.8 ± 172.8 vs 1.540.7 ± 106.3; P = 0.004, t test). The working week of specialists in the four observed specialties in hospitals was longer than the recommended 48 hours a week. Conclusion The lack of physicians, especially in primary health care can lead to a reduced access to health care and increased workload of physicians, predominantly in rural counties, regardless of the counties’ GDP. PMID:18581617
NASA Technical Reports Server (NTRS)
Hoffman, Edward
2002-01-01
I recently accompanied my son Dan to one of his guitar lessons. As I sat in a separate room, I focused on the music he was playing and the beautiful, robust sound that comes from a well-played guitar. Later that night, I woke up around 3 am. I tend to have my best thoughts at this hour. The trouble is I usually roll over and fall back asleep. This time I was still awake an hour later, so I got up and jotted some notes down in my study. I was thinking about the pure, honest sound of a well-played instrument. From there my mind wandered into the realm of high-performance teams and successful projects. (I know this sounds weird, but this is the sort of thing I think about at 3 am. Maybe you have your own weird thoughts around that time.) Consider a team in relation to music. It seems to me that a crack team can achieve a beautiful, perfect unity in the same way that a band of brilliant musicians can when they're in harmony with one another. With more than a little satisfaction I have to admit, I started to think about the great work performed for you by the Knowledge Sharing team, including this magazine you are reading. Over the past two years I personally have received some of my greatest pleasures as the APPL Director from the Knowledge Sharing activities - the Masters Forums, NASA Center visits, ASK Magazine. The Knowledge Sharing team expresses such passion for their work, just like great musicians convey their passion in the music they play. In the case of Knowledge Sharing, there are many factors that have made this so enjoyable (and hopefully worthwhile for NASA). Three ingredients come to mind -- ingredients that have produced a signature sound. First, through the crazy, passionate playing of Alex Laufer, Michelle Collins, Denise Lee, and Todd Post, I always know that something startling and original is going to come out of their activities. This team has consistently done things that are unique and innovative. For me, best of all is that they are always trying to improve on what they've done before. Second, success in any endeavor stems from people who know how to interpret a composition to sound beautiful when played in a different style. For Knowledge Sharing to work, it must be adapted, reinterpreted, shaped and played with at the centers. In this regard, we've been blessed with another crazy, passionate, inspired artist named Claire Smith. Claire has turned Ames Research Center in California into APPL-west. She is so good and committed to what she does that I just refer people to her whenever they have questions about implementing project management development at the field level. Finally, any great effort requires talented people working behind the scenes, the people who formulate a business approach and know how to manage the money so that the music gets heard. I have known many brilliant and creative people with a ton of ideas that never take off due to an inability to work the business. Again, the Knowledge Sharing team has been fortunate to have competent and passionate people, specifically Tony Maturo and his procurement team at Goddard Space Flight Center, to make sure the process is in place to support the effort. This kind of support is every bit as crucial as the activity itself, and the efforts and creativity that go into successful procurement and contracting is a vital ingredient of this successful team.
Advanced Stirling Convertor (ASC)--From Technology Development to Future Flight Product
NASA Technical Reports Server (NTRS)
Wong, Wayne A.; Wood, J. Gary; Wilson, Kyle
2008-01-01
The Advanced Stirling Convertor (ASC) is being developed by Sunpower Inc. under contract to NASA s Glenn Research Center (GRC) with critical technology support tasks led by GRC. The ASC development, funded by NASA s Science Mission Directorate, started in 2003 as one of 10 competitively awarded contracts that were intended to address the power conversion needs of future Radioisotope Power Systems (RPS). The ASC technology has since evolved through progressive convertor builds and successful testing to demonstrate high conversion efficiency (38 percent), low mass (1.3 kg), hermetic sealing, launch vibration simulation, EMI characterization, and is undergoing extended operation. The GRC and Sunpower team recently delivered two ASC-E convertors to the Department of Energy (DOE) and Lockheed Martin Space Systems Company for integration onto the Advanced Stirling Radioisotope Generator Engineering Unit (ASRG EU) plus one spare. The design of the next build, called the ASC-E2, has recently been initiated and is based on the heritage ASC-E with design refinements to increase reliability margin and offer higher temperature operation and improve performance. The ASC enables RPS system specific power of about 7 to 8 W/kg. This paper provides a chronology of ASC development to date and summarizes technical achievements including advancements toward flight implementation of the technology on ASRG by as early as 2013.
Pre-Launch Tasks Proposed in our Contract of December 1991
NASA Technical Reports Server (NTRS)
1998-01-01
We propose, during the pre-EOS phase to: (1) develop, with other MODIS Team Members, a means of discriminating different major biome types with NDVI and other AVHRR-based data; (2) develop a simple ecosystem process model for each of these biomes, BIOME-BGC; (3) relate the seasonal trend of weekly composite NDVI to vegetation phenology and temperature limits to develop a satellite defined growing season for vegetation; and (4) define physiologically based energy to mass conversion factors for carbon and water for each biome. Our final core at-launch product will be simplified, completely satellite driven biome specific models for net primary production. We will build these biome specific satellite driven algorithms using a family of simple ecosystem process models as calibration models, collectively called BIOME-BGC, and establish coordination with an existing network of ecological study sites in order to test and validate these products. Field datasets will then be available for both BIOME-BGC development and testing, use for algorithm developments of other MODIS Team Members, and ultimately be our first test point for MODIS land vegetation products upon launch. We will use field sites from the National Science Foundation Long-Term Ecological Research network, and develop Glacier National Park as a major site for intensive validation.
Pre-Launch Tasks Proposed in our Contract of December 1991
NASA Technical Reports Server (NTRS)
Running, Steven W.; Nemani, Ramakrishna R.; Glassy, Joseph
1997-01-01
We propose, during the pre-EOS phase to: (1) develop, with other MODIS Team Members, a means of discriminating different major biome types with NDVI and other AVHRR-based data. (2) develop a simple ecosystem process model for each of these biomes, BIOME-BGC (3) relate the seasonal trend of weekly composite NDVI to vegetation phenology and temperature limits to develop a satellite defined growing season for vegetation; and (4) define physiologically based energy to mass conversion factors for carbon and water for each biome. Our final core at-launch product will be simplified, completely satellite driven biome specific models for net primary production. We will build these biome specific satellite driven algorithms using a family of simple ecosystem process models as calibration models, collectively called BIOME-BGC, and establish coordination with an existing network of ecological study sites in order to test and validate these products. Field datasets will then be available for both BIOME-BGC development and testing, use for algorithm developments of other MODIS Team Members, and ultimately be our first test point for MODIS land vegetation products upon launch. We will use field sites from the National Science Foundation Long-Term Ecological Research network, and develop Glacier National Park as a major site for intensive validation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garrett, Richard L.; Niemi, Belinda J.; Paik, Ingle K.
2013-11-07
A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25more » recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.« less
LCROSS: A High Return, Small Satellite Mission
NASA Technical Reports Server (NTRS)
Andrews, Daniel R.
2010-01-01
Early in 2006, the NASA Exploration Systems Mission Directorate (ESMD) held a competition for NASA Centers to propose innovative ideas for a secondary payload mission to launch with the Lunar Reconnaissance Orbiter (LRO) to the Moon. The successful proposal could cost no more than $80 million dollars (less was preferred), would have to be ready to launch with the LRO in 31 months, could weigh no more than 1000 kg (fuelled), and would be designated a risk-tolerant "Class D" mission. In effect, NASA was offering a fixed-price contract to the winning NASA team to stay within a cost and schedule cap by accepting an unusually elevated risk position. To address this Announcement of Opportunity to develop a cost-and-schedule-capped secondary payload mission to fly with LRO, NASA Ames Research Center (ARC) in Moffett Field, CA, USA embarked on a brainstorming effort termed "Blue Ice" in which a small team was asked to explore a number of mission scenarios that might have a good chance for success and still fit within the stated programmatic constraints. From this work, ARC developed and submitted six of the nineteen mission proposals received by ESMD from throughout the Agency, one of which was LCROSS - a collaborative effort between ARC and its industrial partner, Northrop-Grumman (NG) in Redondo Beach, CA, USA.
Smart Grid Enabled L2 EVSE for the Commercial Market
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weeks, John; Pugh, Jerry
In 2011, the DOE issued Funding Opportunity DE-FOA-0000554 as a means of addressing two major task areas identified by the Grid Integration Tech Team (GITT) that would help transition Electric vehicles from a market driven by early adopters and environmental supporters to a market with mainstream volumes. Per DE-FOA-0000554, these tasks were: To reduce the cost of Electric Vehicle Supply Equipment (EVSE), thereby increasing the likelihood of the build out of EV charging infrastructure. The goal of increasing the number of EVSE available was to ease concerns over range anxiety, and promote the adoption of electric vehicles: To allow EVmore » loads to be managed via the smart grid, thereby maintaining power quality, reliability and affordability, while protecting installed distribution equipment. In December of that year, the DOE awarded one of the two contracts targeted toward commercial EVSE to Eaton, and in early 2012, we began in earnest the process of developing a Smart Grid Enable L2 EVSE for the Commercial Market (hereafter known as the DOE Charger). The design of the Smart Grid Enabled L2 EVSE was based primarily on the FOA requirements along with input from the Electric Transportation Infrastructure product line (hereafter ETI) marketing team who aided in development of the customer requirements.« less
2013-01-01
Background In 2008–2009 the South African National Tuberculosis (TB) Program (NTP) implemented a national pilot project, the TB Tracer Project, aiming to decrease default rates and improve patient outcomes. The current study aimed to inform the NTP by describing the knowledge, attitudes, and practices of TB program personnel involved with tracing activities. Methods A self-administered written questionnaire was sent to TB staff, managers and tracer team leaders to assess basic TB knowledge, attitudes and practices. Descriptive statistics were used to summarize results and the chi-squared statistic was used to compare responses of staff at facilities that participated in the TB Tracer Project (tracer) and those that followed standard NTP care (non-tracer). Results Of 560 total questionnaires distributed, 270 were completed and returned (response rate 48%). Total TB knowledge ranged from 70.8-86.3% correct across all response groups. However, just over half (range 50–59.3%) of each respondent group was able to correctly identify the four components of a DOT encounter. A patient no longer feeling sick was cited by 72.1% of respondents as the reason patients fail to adhere to treatment. Tracer teams were viewed as an effective means to get patients to return to treatment by 96.3% of health facility level respondents. Tracer team leaders reported concerns including lack of logistical support (41.7%), insufficient physical safety precautions (41.7%), and inadequate protection from contracting TB (39.1%). Upon patients returning to treatment at the clinic, facilities included in the TB Tracer Project were significantly more likely to discuss alternate DOTS arrangements than non-tracer facilities (79.2 vs. 66.4%, p = 0.03). Conclusions This study identified key components of knowledge, attitudes, and practices regarding TB patient tracing activities in South Africa. Educating patients on the essential need to complete treatment irrespective of clinical symptoms may help improve treatment adherence. Future scale-up and integration of TB tracing activities as part of standard TB management should include provisions for standardized training of personnel on the critical elements of DOTS, and for ensuring appropriate supervision, logistical support, and physical safety and TB transmission protection of tracing teams. PMID:24007294
NASA Astrophysics Data System (ADS)
Goodrich, D. C.; Clifford, T. J.; Guertin, D. P.; Sheppard, B. S.; Barlow, J. E.; Korgaonkar, Y.; Burns, I. S.; Unkrich, C. C.
2016-12-01
Wildfires disasters are common throughout the western US. While many feel fire suppression is the largest cost of wildfires, case studies note rehabilitation costs often equal or greatly exceed suppression costs. Using geospatial data sets, and post-fire burn severity products, coupled with the Automated Geospatial Watershed Assessment tool (AGWA - www.tucson.ars.ag.gov/agwa), the Dept. of Interior, Burned Area Emergency Response (BAER) teams can rapidly analyze and identify at-risk areas to target rehabilitation efforts. AGWA employs nationally available geospatial elevation, soils, and land cover data to parameterize the KINEROS2 hydrology and erosion model. A pre-fire watershed simulation can be done prior to BAER deployment using design storms. As soon as the satellite-derived Burned Area Reflectance Classification (BARC) map is obtained, a post-fire watershed simulation using the same storm is conducted. The pre- and post-fire simulations can be spatially differenced in the GIS for rapid identification of high at-risk areas of erosion or flooding. This difference map is used by BAER teams to prioritize field observations and in-turn produce a final burn severity map that is used in AGWA/KINEROS2 simulations to provide report ready results. The 2013 Elk Wildfire Complex that burned over 52,600 ha east of Boise, Idaho provides a tangible example of how BAER experts combined AGWA and geospatial data that resulted in substantial rehabilitation cost savings. The BAER team initially, they identified approximately 6,500 burned ha for rehabilitation. The team then used the AGWA pre- and post-fire watershed simulation results, accessibility constraints, and land slope conditions in an interactive process to locate burned areas that posed the greatest threat to downstream values-at-risk. The group combined the treatable area, field observations, and the spatial results from AGWA to target seed and mulch treatments that most effectively reduced the threats. Using this process, the BAER Team reduced the treatable acres from the original 16,000 ha to between 800 and 1,600 ha depending on the selected alternative. The final awarded contract amounted to about 1,480/ha, therefore, a total savings of 7.2 - $8.4 million was realized for mulch treatment alone.
Brooks, M. Alison; Post, Eric G.; Trigsted, Stephanie M.; Schaefer, Daniel A.; Wichman, Daniel M.; Watson, Andrew M.; McGuine, Timothy A.; Bell, David R.
2018-01-01
Background: There are a variety of proposed motivations for sport specialization, such as improving sport skills to an elite level, making all-star or travel teams, or receiving a scholarship or professional contract. However, there has not been a quantitative examination of the attitudes and beliefs that may be contributing to the trend of sport specialization and year-round sport participation. Purpose: The primary aim was to describe the attitudes and beliefs of youth club sport athletes regarding sport specialization and sport participation. A secondary objective was to investigate whether an association exists between the level of sport specialization and the belief in receiving a college scholarship. Study Design: Cross-sectional study; Level of evidence, 3. Methods: A total of 974 youth athletes (578 female; mean age, 14.2 ± 1.6 years) completed an anonymous questionnaire that focused on attitudes and beliefs toward sport specialization and sport participation. Questions were developed utilizing the feedback of a panel of content area experts and the University of Wisconsin Survey Center. Data were summarized using frequencies, proportions (%), and means ± SDs. Results: Fewer than half of all athletes (45.8%) believed that specialization increased their chances of getting injured either “quite a bit” or “a great deal.” However, 91% of athletes believed that specialization increased their chances of getting better at their sport either “quite a bit” or “a great deal.” Similarly, the majority of athletes believed that specialization increased their chances of making their high school team (80.9%) or a college team (66.9%) either “quite a bit” or “a great deal.” Overall, 15.7% of athletes believed that they were either “very” or “extremely” likely to receive a college scholarship based on athletic performance. Highly specialized athletes were nearly twice as likely to have a high belief in receiving a college scholarship compared with low-specialization athletes (20.2% vs 10.2%, respectively; χ2 = 18.8; P = .001). Conclusion: Most youth athletes in this study believe that specialization increases their sport performance and ability to make not only a college team but also their high school team. Highly specialized athletes were more likely to believe that they will receive a college scholarship. PMID:29770341
Rethinking 'academic' drug discovery: the Manchester Institute perspective.
Jordan, Allan M; Waddell, Ian D; Ogilvie, Donald J
2015-05-01
The contraction in research within pharma has seen a renaissance in drug discovery within the academic setting. Often, groups grow organically from academic research laboratories, exploiting a particular area of novel biology or new technology. However, increasingly, new groups driven by industrial staff are emerging with demonstrable expertise in the delivery of medicines. As part of a strategic review by Cancer Research UK (CR-UK), the drug discovery team at the Manchester Institute was established to translate novel research from the Manchester cancer research community into drug discovery programmes. From a standing start, we have taken innovative approaches to solve key issues faced by similar groups, such as hit finding and target identification. Herein, we share our lessons learnt and successful strategies. Copyright © 2014 Elsevier Ltd. All rights reserved.
Putting the Power of Configuration in the Hands of the Users
NASA Technical Reports Server (NTRS)
Al-Shihabi, Mary-Jo; Brown, Mark; Rigolini, Marianne
2011-01-01
Goal was to reduce the overall cost of human space flight while maintaining the most demanding standards for safety and mission success. In support of this goal, a project team was chartered to replace 18 legacy Space Shuttle nonconformance processes and systems with one fully integrated system Problem Reporting and Corrective Action (PRACA) processes provide a closed-loop system for the identification, disposition, resolution, closure, and reporting of all Space Shuttle hardware/software problems PRACA processes are integrated throughout the Space Shuttle organizational processes and are critical to assuring a safe and successful program Primary Project Objectives Develop a fully integrated system that provides an automated workflow with electronic signatures Support multiple NASA programs and contracts with a single "system" architecture Define standard processes, implement best practices, and minimize process variations
Evolution of the Power Processing Units Architecture for Electric Propulsion at CRISA
NASA Astrophysics Data System (ADS)
Palencia, J.; de la Cruz, F.; Wallace, N.
2008-09-01
Since 2002, the team formed by EADS Astrium CRISA, Astrium GmbH Friedrichshafen, and QinetiQ has participated in several flight programs where the Electric Propulsion based on Kaufman type Ion Thrusters is the baseline conceptOn 2002, CRISA won the contract for the development of the Ion Propulsion Control Unit (IPCU) for GOCE. This unit together with the T5 thruster by QinetiQ provides near perfect atmospheric drag compensation offering thrust levels in the range of 1 to 20mN.By the end of 2003, CRISA started the adaptation of the IPCU concept to the QinetiQ T6 Ion Thruster for the Alphabus program.This paper shows how the Power Processing Unit design evolved in time including the current developments.
Research on Orbital Plasma Electrodynamics (ROPE)
NASA Technical Reports Server (NTRS)
Intriligator, Devrie S.
1998-01-01
This final report summarizes some of the important scientific contributions to the Research on Orbital Plasma Electrodynamics (ROPE) investigation, to the Tethered Satellite System (TSS) mission, and to NASA that resulted from the work carried out under this contract at Carmel Research Center. These include Dr. Intriligator's participation in the PIT for the TSS-1R simulations and flight, her participation in ROPE team meetings and IWG meetings, her scientific analyses, and her writing and submitting technical papers to scientific journals. The scientific analyses concentrated on the characterization of energetic ions and their possible relation to pickup ion effects, correlation of particle and other effects (e.g., magnetic field, satellite surface), and collaboration with theorists including with ROPE co-investigators. In addition, scientific analyses were carried out of the effects due to satellite gas releases.
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Chum, Frank Y.; Gallagher, Suzy; Granier, Martin; Hall, Philip P.; Moreau, Dennis R.; Triantafyllopoulos, Spiros
1985-01-01
This Working Paper Series entry represents the abstracts and visuals associated with presentations delivered by six USL NASA/RECON research team members at the above named conference. The presentations highlight various aspects of NASA contract activities pursued by the participants as they relate to individual research projects. The titles of the six presentations are as follows: (1) The Specification and Design of a Distributed Workstation; (2) An Innovative, Multidisciplinary Educational Program in Interactive Information Storage and Retrieval; (3) Critical Comparative Analysis of the Major Commercial IS and R Systems; (4) Design Criteria for a PC-Based Common User Interface to Remote Information Systems; (5) The Design of an Object-Oriented Graphics Interface; and (6) Knowledge-Based Information Retrieval: Techniques and Applications.
Multidisciplinary, multimodal approach for a child with a traumatic facial scar.
Admani, Shehla; Gertner, Jeffrey W; Grosman, Amanda; Shumaker, Peter R; Uebelhoer, Nathan S; Krakowski, Andrew C
2015-03-01
The treatment of disfiguring and disabling scars remains a field of active study, reinvigorated with recent advances in techniques and technologies. A variety of approaches can be utilized depending on scar characteristics, location, degree of tissue loss, and associated contractures. Just as traumatic scars can be complex and heterogeneous, the corresponding paradigm for treatment must also be flexible and multimodal for optimal improvement. This report describes a 3-year-old girl with a "mixed" (atrophic/hypertrophic), violaceous, contracted facial scar from a dog bite. It was treated with a novel approach utilizing a multidisciplinary pediatric scar team to combine autologous fat grafting, ablative fractional laser resurfacing, pulsed-dye laser, and laser-assisted delivery of a corticosteroid as concurrent, multimodal therapy to optimize the outcome. ©2015 Frontline Medical Communications.
Developing the Pulsed Fission-Fusion (PuFF) Engine
NASA Technical Reports Server (NTRS)
Adams, Robert B.; Cassibry, Jason; Bradley, David; Fabisinski, Leo; Statham, Geoffrey
2014-01-01
In September 2013 the NASA Innovative Advanced Concept (NIAC) organization awarded a phase I contract to the PuFF team. Our phase 1 proposal researched a pulsed fission-fusion propulsion system that compressed a target of deuterium (D) and tritium (T) as a mixture in a column, surrounded concentrically by Uranium. The target is surrounded by liquid lithium. A high power current would flow down the liquid lithium and the resulting Lorentz force would compress the column by roughly a factor of 10. The compressed column would reach criticality and a combination of fission and fusion reactions would occur. Our Phase I results, summarized herein, review our estimates of engine and vehicle performance, our work to date to model the fission-fusion reaction, and our initial efforts in experimental analysis.
Planetary Science and Spacecraft Analogs in the Classroom
NASA Astrophysics Data System (ADS)
Edberg, S. J.; McConnell, S. L.
2000-12-01
The Cassini Program Outreach Team has developed a number of classroom demonstrations and activities that present science investigation techniques and spacecraft flight operations. These activities and demonstrations include analogs to planetary magnetic field orientations, ring particle and atmospheric scattering, thermal inertia studies, body-mounted vs. scan platform-mounted instrument operations on spacecraft, gravity assist, and many others. These curriculum supplements utilize inexpensive, commonly available materials that can be found in household kitchens, backyards, and hardware and variety stores. While designed for middle school classrooms, these activities are easily modified for use in both elementary and high school classes. We will demonstrate several of our activities and present information on others. This research was carried out at the Jet Propulsion Laboratory, California Institute of Technology, under a contract with the National Aeronautics and Space Administration.
Planetary Science and Spacecraft Analogs in the Classroom
NASA Astrophysics Data System (ADS)
Edberg, S. J.; McConnell, S. L.
2000-10-01
The Cassini Program Outreach Team has developed a number of classroom demonstrations and activities that present science investigation techniques and spacecraft flight operations. These activities and demonstrations include analogs to planetary magnetic field orientations, ring particle and atmospheric scattering, thermal inertia studies, body-mounted vs. scan platform-mounted instrument operations on spacecraft, gravity assist, and many others. These curriculum supplements utilize inexpensive, commonly available materials that can be found in household kitchens, backyards, and hardware and variety stores. While designed for middle school classrooms, these activities are easily modified for use in both elementary and high school classes. We will demonstrate several of our activities and present information on others. This research was carried out at the Jet Propulsion Laboratory, California Institute of Technology, under a contract with the National Aeronautics and Space Administration.
SPRITE: the Spitzer proposal review website
NASA Astrophysics Data System (ADS)
Crane, Megan K.; Storrie-Lombardi, Lisa J.; Silbermann, Nancy A.; Rebull, Luisa M.
2008-07-01
The Spitzer Science Center (SSC), located on the campus of the California Institute of Technology, supports the science operations of NASA's infrared Spitzer Space Telescope. The SSC issues an annual Call for Proposals inviting investigators worldwide to submit Spitzer Space Telescope proposals. The Spitzer Proposal Review Website (SPRITE) is a MySQL/PHP web database application designed to support the SSC proposal review process. Review panel members use the software to view, grade, and write comments about the proposals, and SSC support team members monitor the grading and ranking process and ultimately generate a ranked list of all the proposals. The software is also used to generate, edit, and email award letters to the proposers. This work was performed at the California Institute of Technology under contract to the National Aeronautics and Space Administration.
Contracting Strategy for Navy Missile Acquisitions.
1977-11-09
PROJ ECT , TASK AREA S WORK UNIT NUMBERS DEFENSE SYSTEMS MANAGEMENT COLLEGE FT. BELVOIR, VA 22060 II. CONTROLLING OFFICE NAME AND ADDRESS 12 . REPORT...technical 12 LL~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~ -. -— . •—_ ~~~~~~~~~~ .~~~~~~~~~~~~ .~~~ evaluation, contractor monitoring...you want o Clear cost advantage if valid data exists o Establishes a dedicated military / industria l team with one basic purpose o More timely respon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greg Retzlaff
In January 2006 the Smith River Rancheria (SRR), located in Smith River, California, contracted with the team of Strategic Energy Solutions (SES) and Evergreen NRG to conduct a study for the community. The objective of the study was to identify renewable generation opportunities that would facilitate Rancheria energy independence through SRR owned and operated power projects. These generation facilities were to be located either on or near the reservation. Specifically, the Rancheria was interested in the viability of generating electric power using biomass and wind fuel resources. Initial research identified that a very small portion of the community's energy couldmore » be offset by renewable energy generation due to the low solar resource in this area, and the lack of significant wind or biomass resources on or near reservation land. Some larger projects were identified which offered little or no benefit to the Rancheria. As a result, the scope of this study was changed in October 2006 to focus on energy efficiency opportunities for key reservation facilities, with a continued analysis of smaller renewable energy opportunities within reservation boundaries. The consulting team initially performed a resource analysis for biomass and solar generation opportunities in the region of the Rancheria. It was quickly concluded that none of these options would yield renewable power for the Rancheria at costs competitive with current utility sources, and that any larger installations would require substantial funding that may not be available. Having made these conclusions early on, the study effort was redirected and the team investigated each of the major Rancheria buildings to look for solar, wind and conservation opportunities. The buildings were audited for energy use and the roof areas were examined for exposure of solar radiation. Wind resources were also investigated to determine if smaller wind turbines would offer power generation at a reasonable cost.« less
Shuttle Upgrade Using 5-Segment Booster (FSB)
NASA Technical Reports Server (NTRS)
Sauvageau, Donald R.; Huppi, Hal D.; McCool, A. A. (Technical Monitor)
2000-01-01
In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2003-10-01
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevron Energy Solutions; Matt Rush; Scott Shulda
Colorado Northwestern Community College (CNCC) is working collaboratively with recipient vendor Chevron Energy Solutions, an energy services company (ESCO), to develop an innovative GHP project at the new CNCC Campus constructed in 2010/2011 in Craig, Colorado. The purpose of the CNCC Craig Campus Geothermal Program scope was to utilize an energy performance contracting approach to develop a geothermal system with a shared closed-loop field providing geothermal energy to each building's GHP mechanical system. Additional benefits to the project include promoting good jobs and clean energy while reducing operating costs for the college. The project has demonstrated that GHP technology ismore » viable for new construction using the energy performance contracting model. The project also enabled the project team to evaluate several options to give the College a best value proposition for not only the initial design and construction costs but build high performance facilities that will save the College for many years to come. The design involved comparing the economic feasibility of GHP by comparing its cost to that of traditional HVAC systems via energy model, financial life cycle cost analysis of energy savings and capital cost, and finally by evaluating the compatibility of the mechanical design for GHP compared to traditional HVAC design. The project shows that GHP system design can be incorporated into the design of new commercial buildings if the design teams, architect, contractor, and owner coordinate carefully during the early phases of design. The public also benefits because the new CNCC campus is a center of education for the much of Northwestern Colorado, and students in K-12 programs (Science Spree 2010) through the CNCC two-year degree programs are already integrating geothermal and GHP technology. One of the greatest challenges met during this program was coordination of multiple engineering and development stakeholders. The leadership of Principle Investigator Pres. John Boyd of CNCC met this challenge by showing clear leadership in setting common goals and resolving conflicts early in the program.« less
Wye, Lesley; Brangan, Emer; Cameron, Ailsa; Gabbay, John; Klein, Jonathan H; Anthwal, Rachel; Pope, Catherine
2015-02-25
The use of external consultants from private and not-for-profit providers in the National Health Service (NHS) is intended to improve the quality of commissioning. The aim of this study was to learn about the support offered to healthcare commissioners, how external consultants and their clients work together and the perceived impact on the quality of commissioning. NHS commissioning organisations and private and not-for-profit providers. Mixed methods case study of eight cases. 92 interviews with external consultants (n=36), their clients (n=47) and others (n=9). Observation of 25 training events and meetings. Documentation, for example, meeting minutes and reports. Constant comparison. Data were coded, summarised and analysed by the research team with a coding framework to facilitate cross-case comparison. In the four contracts presented here, external providers offered technical solutions (eg, software tools), outsourcing and expertise including project management, data interpretation and brokering relationships with experts. In assessing perceived impact on quality of commissioning, two contracts had limited value, one had short-term benefits and one provided short and longer term benefits. Contracts with commissioners actively learning, embedding and applying new skills were more valued. Other elements of success were: (1) addressing clearly agreed problems of relevance to managerial and operational staff (2) solutions co-produced at all organisational levels (3) external consultants working directly with clients to interpret data outputs to inform locally contextualised commissioning strategies. Without explicit knowledge exchange strategies, outsourcing commissioning to external providers resulted in the NHS clients becoming dependent. NHS commissioning will be disadvantaged if commissioners both fail to learn in the short term from the knowledge of external providers and in the longer term lose local skills. Knowledge exchange mechanisms are a vital component of commissioning and should be embedded in external provider contracts. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
NASA Astrophysics Data System (ADS)
Stroeve, Julienne C.; Jenouvrier, Stephanie; Campbell, G. Garrett; Barbraud, Christophe; Delord, Karine
2016-08-01
Sea ice variability within the marginal ice zone (MIZ) and polynyas plays an important role for phytoplankton productivity and krill abundance. Therefore, mapping their spatial extent as well as seasonal and interannual variability is essential for understanding how current and future changes in these biologically active regions may impact the Antarctic marine ecosystem. Knowledge of the distribution of MIZ, consolidated pack ice and coastal polynyas in the total Antarctic sea ice cover may also help to shed light on the factors contributing towards recent expansion of the Antarctic ice cover in some regions and contraction in others. The long-term passive microwave satellite data record provides the longest and most consistent record for assessing the proportion of the sea ice cover that is covered by each of these ice categories. However, estimates of the amount of MIZ, consolidated pack ice and polynyas depend strongly on which sea ice algorithm is used. This study uses two popular passive microwave sea ice algorithms, the NASA Team and Bootstrap, and applies the same thresholds to the sea ice concentrations to evaluate the distribution and variability in the MIZ, the consolidated pack ice and coastal polynyas. Results reveal that the seasonal cycle in the MIZ and pack ice is generally similar between both algorithms, yet the NASA Team algorithm has on average twice the MIZ and half the consolidated pack ice area as the Bootstrap algorithm. Trends also differ, with the Bootstrap algorithm suggesting statistically significant trends towards increased pack ice area and no statistically significant trends in the MIZ. The NASA Team algorithm on the other hand indicates statistically significant positive trends in the MIZ during spring. Potential coastal polynya area and amount of broken ice within the consolidated ice pack are also larger in the NASA Team algorithm. The timing of maximum polynya area may differ by as much as 5 months between algorithms. These differences lead to different relationships between sea ice characteristics and biological processes, as illustrated here with the breeding success of an Antarctic seabird.
Tektite 1, man-in-the-sea project: Marine Science Program
Clifton, H.E.; Mahnken, C.V.W.; Van Derwalker, J. C.; Waller, R.A.
1970-01-01
The Tektite experiment was designed to provide data for a number of behavioral, biomedical, and engineering studies in addition to the marine sciences program. Conditions for some of these studies were not altogether compatible with the program for the marine sciences. For example, isolation imposed by human behavioral studies precluded physical contact with the surface team, even though such contact was physically possible and desirable for the conduct of the marine sciences program. Isolation also imposed on the scientific team the duty of all in-habitat maintenance, both scheduled and unscheduled, thereby taking substantial time from scientific research. In addition, between 10 and 20 percent of the waking time was devoted to performance of psychological tests required for the biomedical studies. Most of the experiments were directed toward detecting potentially adverse changes and thus were accepted as necessary and desirable. The only health problem to affect the scientific program during the dive was a minor external ear infection contracted by all the divers. Nonetheless, the experiment demon. strated, at least to our satisfaction, the advantages of underwater habitation and saturation diving for biological and geological research. A major advantage is the opportunity for continuous monitoring of organisms or processes. In addition, underwater habitation provides for considerably more research time in the water than surface diving or intermittent bottom dwelling, and this advantage increases greatly as the depth of habitation increases. Even in the relatively shallow depths at which Tektite 1 was conducted, the undersea team could spend appreciably more time at work in the water than their colleagues on the surface. Finally, Tektite 1 demonstrated that the scientist who lives in the sea need not have the extensive qualifications of a professional diver. Of the four scientists of the in-habitat team, only Crew Chief Waller was so qualified; the other three had used scuba as a research tool, but on a relatively limited basis. Any healthy, well-conditioned marine scientist with a basic diving background is capable of extending his research into the shallow sea on a full-time basis. It is hoped that many such scientists will in the future be able to utilize the undersea laboratory.
The Tri-lab Tantalum Strength Consortium
NASA Astrophysics Data System (ADS)
Flicker, Dawn G.; Arsenlis, Thomas A.; Austin, Ryan; Barton, Nathan R.; Benage, John F.; Bronkhorst, Curt A.; Brown, Justin L.; Brown, Staci L.; Buttler, William T.; Shen, Shuh-Rong; Dattelbaum, Dana M.; Fensin, Sayu J.; Gray, George T., III; Lane, J. Matthew D.; Lim, Hojun; Luscher, D. J.; Mattsson, Thomas R.; McNabb, Dennis P.; Remington, Bruce A.; Park, Hye-Sook; Prisbrey, Shon T.; Prime, Michael B.; Scharff, Robert J.; Schraad, Mark W.; Sun, Amy C.
2017-06-01
A Tri-lab consortium of experimentalists and theorists at SNL, LLNL, and LANL is joining forces to better understand tantalum strength across an unprecedented range of loading conditions. The team is collecting and comparing tantalum strength data from Hopkinson bar, Taylor cylinder, guns, Z, Omega and the NIF. These experiments, all using Ta from a single lot, span pressures from tenths to hundreds of GPa and strain rates from 103 to 107. New experiments are underway to provide more overlap between the platforms. The experiments are being simulated with a variety of models in order to determine which processes are important under which conditions. The presentation will show results to date. Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000.
Renewable Energy Certificate Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gwendolyn S. Andersen
2012-07-17
This project was primarily to develop and implement a curriculum which will train undergraduate and graduate students at the University seeking a degree as well as training for enrollees in a special certification program to prepare individuals to be employed in a broad range of occupations in the field of renewable energy and energy conservation. Curriculum development was by teams of Saint Francis University Faculty in the Business Administration and Science Departments and industry experts. Students seeking undergraduate and graduate degrees are able to enroll in courses offered within these departments which will combine theory and hands-on training in themore » various elements of wind power development. For example, the business department curriculum areas include economic modeling, finance, contracting, etc. The science areas include meteorology, energy conversion and projection, species identification, habitat protection, field data collection and analysis, etc.« less
Tuohey, J F
1998-01-01
Catholic healthcare should establish comprehensive compliance strategies, beyond following Medicare reimbursement laws, that reflect mission and ethics. A covenant model of business ethics--rather than a self-interest emphasis on contracts--can help organizations develop a creed to focus on obligations and trust in their relationships. The corporate integrity program (CIP) of Mercy Health System Oklahoma promotes its mission and interests, educates and motivates its employees, provides assurance of systemwide commitment, and enforces CIP policies and procedures. Mercy's creed, based on its mission statement and core values, articulates responsibilities regarding patients and providers, business partners, society and the environment, and internal relationships. The CIP is carried out through an integrated network of committees, advocacy teams, and an expanded institutional review board. Two documents set standards for how Mercy conducts external affairs and clarify employee codes of conduct.
Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, L.; Walker, J.
1982-08-01
Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less
Mongoose: Creation of a Rad-Hard MIPS R3000
NASA Technical Reports Server (NTRS)
Lincoln, Dan; Smith, Brian
1993-01-01
This paper describes the development of a 32 Bit, full MIPS R3000 code-compatible Rad-Hard CPU, code named Mongoose. Mongoose progressed from contract award, through the design cycle, to operational silicon in 12 months to meet a space mission for NASA. The goal was the creation of a fully static device capable of operation to the maximum Mil-883 derated speed, worst-case post-rad exposure with full operational integrity. This included consideration of features for functional enhancements relating to mission compatibility and removal of commercial practices not supported by Rad-Hard technology. 'Mongoose' developed from an evolution of LSI Logic's MIPS-I embedded processor, LR33000, code named Cobra, to its Rad-Hard 'equivalent', Mongoose. The term 'equivalent' is used to infer that the core of the processor is functionally identical, allowing the same use and optimizations of the MIPS-I Instruction Set software tool suite for compilation, software program trace, etc. This activity was started in September of 1991 under a contract from NASA-Goddard Space Flight Center (GSFC)-Flight Data Systems. The approach affected a teaming of NASA-GSFC for program development, LSI Logic for system and ASIC design coupled with the Rad-Hard process technology, and Harris (GASD) for Rad-Hard microprocessor design expertise. The program culminated with the generation of Rad-Hard Mongoose prototypes one year later.
Professional indemnity insurance and the practice of medicine during bullfights in France.
Franchitto, Nicolas; Gavarri, Laurent; Telmon, Norbert; Rougé, Daniel
2008-12-01
Bullfighting can provoke strong reactions, for fans and laymen alike. Risks to the health of participants are inseparable from the spectacle. Organisers call on a medical team whose main task is to treat the bullfighter's injuries. Despite the special features of this medical practice doctors are not exempt from the possibility of the question of their liability being raised in the event of medical malpractice and large financial damages for the bullfighter if he is harmed. The doctor's public liability and professional indemnity insurance contract is therefore all the more important, in fact, this insurance covers damages for harm caused by the policy holder from the moment he is declared liable. In the statute of 4th March 2002, the French legislature brought in compulsory insurance for health professionals with the aim of achieving the best possible compensation for harm. While public liability and professional indemnity insurance is compulsory for doctors, the purpose of making this insurance compulsory is to cover compensation for harm suffered by the victim. In the case of bullfights, faced with insufficient legal regulation and the fact that more often than not the medicine practised in this field is on a voluntary basis, it might be interesting to offer some thoughts on the special features of the insurance contract that ought to be adapted to these extreme working conditions.
Grant, Suzanne; Ring, Adele; Gabbay, Mark; Guthrie, Bruce; McLean, Gary; Mair, Frances S; Watt, Graham; Heaney, David; O'Donnell, Catherine
2015-01-01
In the UK National Health Service, primary care organisation (PCO) managers have traditionally relied on the soft leadership of general practitioners based on professional self-regulation rather than direct managerial control. The 2004 general medical services contract (nGMS) represented a significant break from this arrangement by introducing new performance management mechanisms for PCO managers to measure and improve general practice work. This article examines the impact of nGMS on the governance of UK general practice by PCO managers through a qualitative analysis of data from an empirical study in four UK PCOs and eight general practices, drawing on Hood's four-part governance framework. Two hybrids emerged: (i) PCO managers emphasised a hybrid of oversight, competition (comptrol) and peer-based mutuality by granting increased support, guidance and autonomy to compliant practices; and (ii) practices emphasised a broad acceptance of increased PCO oversight of clinical work that incorporated a restratified elite of general practice clinical peers at both PCO and practice levels. Given the increased international focus on the quality, safety and efficiency in primary care, a key issue for PCOs and practices will be to achieve an effective, contextually appropriate balance between the counterposing governance mechanisms of peer-led mutuality and externally led comptrol. © 2015 The Authors. Sociology of Health & Illness © 2015 Foundation for the Sociology of Health & Illness/John Wiley & Sons Ltd.
2007-09-09
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. In this HD video image, the first stage reentry 1/2% model is undergoing pressure measurements inside the wind tunnel testing facility at MSFC. (Highest resolution available)
Prevention of Tinea Corporis in Collegiate Wrestlers
Hand, James W.; Wroble, Randall R.
1999-01-01
Objective: To examine the role of a comprehensive skin disease prevention protocol in conjunction with the use of a barrier cream to prevent tinea corporis (ringworm) in collegiate wrestlers. Design and Setting: We studied a college wrestling team for 16 weeks during 1 season. During the first 8 weeks, no preventive measures were taken. For the remaining 8 weeks, wrestlers were randomized into 2 groups and used either a barrier or a placebo. Subjects: Twenty-two male college wrestlers with a mean age of 20.4 years (range, 18.1 to 23.2), a mean weight of 68.4 kg (range, 55.8 to 130.2), and a mean height of 177.8 cm (range, 168.7 to 186.9). Measurements: We performed skin checks daily. All new or exacerbated lesions were clinically diagnosed by the same team physician and recorded. Results: Cases of tinea corporis declined from 10 diagnosed before initiation of the protocol to 1 after the protocol was initiated. One athlete in the placebo group was found to have tinea corporis versus none in the barrier cream group. Conclusions: Strict adherence to the prevention protocol for skin infections significantly decreased the number of cases of tinea corporis. The use of the barrier cream in conjunction with the prevention protocol did not result in any further statistical reduction in the number of wrestlers who contracted tinea corporis. PMID:16558587
Cryogenics maintenance strategy
NASA Astrophysics Data System (ADS)
Cruzat, Fabiola
2012-09-01
ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.
Pre-Mission Input Requirements to Enable Successful Sample Collection by A Remote Field/EVA Team
NASA Technical Reports Server (NTRS)
Cohen, B. A.; Lim, D. S. S.; Young, K. E.; Brunner, A.; Elphic, R. E.; Horne, A.; Kerrigan, M. C.; Osinski, G. R.; Skok, J. R.; Squyres, S. W.;
2016-01-01
The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team, part of the Solar System Exploration Virtual Institute (SSERVI), is a field-based research program aimed at generating strategic knowledge in preparation for human and robotic exploration of the Moon, near-Earth asteroids, Phobos and Deimos, and beyond. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused and, moreover, is sampling-focused with the explicit intent to return the best samples for geochronology studies in the laboratory. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. We examined the in situ sample characterization and real-time decision-making process of the astronauts, with a guiding hypothesis that pre-mission training that included detailed background information on the analytical fate of a sample would better enable future astronauts to select samples that would best meet science requirements. We conducted three tests of this hypothesis over several days in the field. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This was not meant to be a blind, controlled test of crew efficacy, but rather an effort to explicitly recognize the relevant variables that enter into sampling protocol and to be able to develop recommendations for crew and backroom training in future endeavors.
No fate but what we make: a case of full recovery after out-of-hospital cardiac arrest.
Miranda, Mafalda; Sousa, Pedro J; Ferreira, Jorge; Andrade, Maria J; Gonçalves, Pedro A; Romão, Cristina
2009-12-11
An 80 years old man suffered a cardiac arrest shortly after arrival to his local health department. Basic Life Support was started promptly and nine minutes later, on evaluation by an Advanced Life Support team, the victim was defibrillated with a 200J shock. When orotracheal intubation was attempted, masseter muscle contraction was noticed: on reevaluation, the victim had pulse and spontaneous breathing.Thirty minutes later, the patient had been transferred to an emergency department. As he complained of chest pain, the ECG showed a ST segment depression in leads V4 to V6 and laboratory tests showed cardiac troponine I slightly elevated. A coronary angiography was performed urgently: significant left main plus three vessel coronary artery disease was disclosed.Eighteen hours after the cardiac arrest, a quadruple coronary artery bypass grafting operation was undertaken. During surgery, a fresh thrombus was removed from the middle left anterior descendent artery. Post-operative course was uneventful and the patient was discharged seven days after the procedure. Twenty four months later, he remains asymptomatic.In this case, the immediate call for the Advanced Life Support team, prompt basic life support and the successful defibrillation, altogether, contributed for the full recovery. Furthermore, the swiftness in the detection and treatment of the acute reversible cause (myocardial ischemia in this case) was crucial for long-term prognosis.
Satellite Radar Detects Damage from Sept. 2017 Chiapas, Mexico Quake
2017-09-19
The Advanced Rapid Imaging and Analysis (ARIA) team at NASA's Jet Propulsion Laboratory in Pasadena, California, and Caltech, also in Pasadena, created this Damage Proxy Map (DPM) depicting areas of Southern Mexico that are likely damaged (shown by red and yellow pixels) from the magnitude 8.1 Chiapas earthquake of Sept. 7, 2017 (near midnight local time, early morning on Sept. 8 UTC). The map is derived from synthetic aperture radar (SAR) images from the Copernicus Sentinel-1A and Sentinel-1B satellites, operated by the European Space Agency (ESA). The images were taken before (Sept. 7, 2017 UTC) and after (Sept. 13, 2017 UTC) the earthquake. The map covers an area of 155 by 106 miles (250 by 170 kilometers). Each pixel measures about 33 yards (30 meters) across. The color variation from yellow to red indicates increasingly more significant ground surface change. Preliminary validation was done by comparing the SAR images to optical satellite imagery from DigitalGlobe. This damage proxy map should be used as guidance to identify damaged areas, and may be less reliable over vegetated areas. Sentinel-1 data were accessed through the Copernicus Open Access Hub. The image contains modified Copernicus Sentinel data (2017), processed by ESA and analyzed by the NASA-JPL/Caltech ARIA team. This research was carried out at JPL under a contract with NASA. https://photojournal.jpl.nasa.gov/catalog/PIA21956
Swift Gamma-Ray Burst Explorer: Mission Design for Rapid, Accurate Location of Gamma-ray Bursts
NASA Technical Reports Server (NTRS)
Bundas, David J.
2004-01-01
The Swift Gamma-ray Burst Explorer is a NASA Mid-sized Explorer (MIDEX) with the primary mission of determining the origins of Gamma-Ray Bursts (GRBs). It will be the first mission to autonomously respond to newly-discovered GRBs and provide immediate follow-up narrow field instruments capable of multi-wavelength (UV, Optical, X-ray) observations. The characteristics of GRBs that are the key mission design drivers, are their non-repeating and brief duration bursts of multi-wavelength photons. In addition, rapid notification of the location and characteristics of the GRBs to ground-and-space- based observatories drive the end-to-end data analysis and distribution requirements. The Swift mission is managed by the GSFC, and includes an international team of contributors that each bring their unique perspective that have proven invaluable to the mission. The spacecraft bus, provided by Spectrum Astro, Inc. was procured through a Rapid Spacecraft Development Office (RSDO) contract by the GSFC. There are three instruments: the Burst Alert Telescope (BAT) provided by the GSFC; the X-Ray Telescope (XRT) provided by a team led by the Pennsylvania State University (PSU); and the Ultra-Violet Optical Telescope (UVOT), again managed by PSU. The Mission Operations Center (MOC) was developed by and is located at PSU. Science archiving and data analysis centers are located at the GSFC, in the UK and in Italy.
2020 Vision for Tank Waste Cleanup (One System Integration) - 12506
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harp, Benton; Charboneau, Stacy; Olds, Erik
2012-07-01
The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive andmore » extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)« less
NASA Astrophysics Data System (ADS)
Bellotti, A.; Steffes, P. G.; Janssen, M. A.
2017-12-01
During Perijove 5 (March 27, 2017), an anomolous signal level was detected by the Juno Microwave Radiometer (MWR) at latitudes north of 50N. This anomaly presented itself in two distinct ways. At the three longest wavelength channels (11.55, 24, 50 cm), a decrease in brightness temperatures at latitudes between 50N-60N was measured. At the longest wavelength channel (50 cm) this decrease is followed by an increase in brightness temperature at higher latitudes. These anomalous brightness temperatures are examined and attributed to Juno MWR flying over and measuring effects from the Jovian aurora. Presented here are the basics of the radiative transfer model needed to properly understand, explain, and model this anomoly. This work was supported by NASA Contract NNM06AA75C from the Marshall Space Flight Center supporting the Juno Mission Science team, under Subcontract 699054X from the Southwest Research Institute.
A strategic tension for hospitals moving upstream: Cede control but maintain accountability.
Taylor, Lauren A; Berchuck, Caroline M; Barnett, Katherine Gergen
2018-07-01
Health systems are focusing attention on the role that social determinants of health (SDOH) can and should play in health care delivery. This is especially true among accountable care organizations (ACOs) and Medicaid ACOs in particular. In crafting SDOH strategies, senior leadership teams may face an organizational tension in aiming to cede control over dollars, data and patient experience to community-based organizations (CBOs) while also maintaining financial accountability for health outcomes. We review the history of neighborhood health centers (NHCs) in order to foreshadow the types of critiques ACOs are likely to face in working with CBOs. We conclude by suggesting a several strategies by which ACOs may be lessen accountability concerns, including raising the issue with regulators, using low-risk dollars to fund joint-work, working through an intermediary, providing technical assistance and viewing the relationship as a partnership rather than contract. Copyright © 2018 Elsevier Inc. All rights reserved.
Flat-plate solar array project. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Callaghan, W.; Mcdonald, R.
1986-01-01
In 1975, the U.S. Government contracted the Jet Propulsion Lab. to develop, by 1985, in conjunction with industry, the photovoltaics (PV) module and array technology required for widespread use of photovoltaics as a significant terrestrial energy source. As a result, a project that eventually became known as the Flat Plate Solar Array (FSA) Project was formed to manage an industry, university, and Government team to perform the necessary research and development. The original goals were to achieve widespread commercial use of PV modules and arrays through the development of technology that would allow them to be profitably sold for $1.07/peak watts (1985 dollars). A 10% module conversion efficiency and a 20 year lifetime were also goals. It is intended that the executive summary provide the means by which one can gain a perspective on 11 years of terrestrial photovoltaic research and development conducted by the FSA Project.
Software ``Best'' Practices: Agile Deconstructed
NASA Astrophysics Data System (ADS)
Fraser, Steven
Software “best” practices depend entirely on context - in terms of the problem domain, the system constructed, the software designers, and the “customers” ultimately deriving value from the system. Agile practices no longer have the luxury of “choosing” small non-mission critical projects with co-located teams. Project stakeholders are selecting and adapting practices based on a combina tion of interest, need and staffing. For example, growing product portfolios through a merger or the acquisition of a company exposes legacy systems to new staff, new software integration challenges, and new ideas. Innovation in communications (tools and processes) to span the growth and contraction of both information and organizations, while managing the adoption of changing software practices, is imperative for success. Traditional web-based tools such as web pages, document libraries, and forums are not suf ficient. A blend of tweeting, blogs, wikis, instant messaging, web-based confer encing, and telepresence creates a new dimension of communication “best” practices.
[Serious events: from statutory requirements to the implementation].
Aullen, J-P; Lassale, B; Verdot, J-J
2008-11-01
From 2005, PACA area has formed think-tank group a priori risk in the transfusional chain. It has enabled to determine each step of the elementary process and evaluate the frequency, the seriousness and critical effect of the errors. Blood sample and conformity are the most critical points and depend on the vigilance identity. In September 2007, the southern blood bank of France has settled 12 nonconformities levels of blood samples. They send the listing of the nonconformities every month. This listing enables the executive staff to determine the errors and, therefore, to solve them. The regional notification of 2007 to 2008 confirms analysis of the think-tank team. Hence, we were able to list the most serious cases. Public and private hospitals have to notify the serious events and will be bound to evaluate professional practices. These acts will be taken into account by the regional-medical contract.
Achieving Space Shuttle ATO Using the Five-Segment Booster (FSB)
NASA Technical Reports Server (NTRS)
Sauvageau, Donald R.; McCool, Alex (Technical Monitor)
2001-01-01
As part of the continuing effort to identify approaches to improve the safety and reliability of the Space Shuttle system, a Five-Segment Booster (FSB) design was conceptualized as a replacement for the current Space Shuttle boosters. The FSB offers a simple, unique approach to improve astronaut safety and increase performance margin. To determine the feasibility of the FSB, a Phase A study effort was sponsored by NASA and directed by the Marshall Space Flight Center. This study was initiated in March of 1999 and completed in December of 2000. The basic objective of this study was to assess the feasibility of the FSB design concept and also estimate the cost and scope of a full-scale development program for the FSB. In order to ensure an effective and thorough evaluation of the FSB concept, four team members were put on contract to support various areas of importance in assessing the overall feasibility of the design approach.
A study of ion composition and dynamics at Comet Halley
NASA Technical Reports Server (NTRS)
Shelley, E. G.; Fuselier, S. A.
1991-01-01
This report details the participation by Lockheed co-investigators in the reduction, analysis, and interpretation of data obtained by the Ion Mass Spectrometer onboard the Giotto mission to Comet Halley. The data analysis activities and much of the scientific collaboration was shared by this team. One objective of the effort under this contract was to use data obtained by the Giotto Ion Mass Spectrometer (IMS) during the encounter with comet Halley for the purpose of advancing our understanding of the chemistry and physics of the interaction of the solar wind with comets and obtaining new information on the comet's composition. An additional objective was to make this unique data set available in a format which can be easily used by the reset of the cometary science community for other analysis in the future. The IMS has two sensors: the High Intensity Spectrometer (HIS) and the High Energy Range Spectrometer (HERS).
Attrition from surgical residency training: perspectives from those who left.
Bongiovanni, Tasce; Yeo, Heather; Sosa, Julie A; Yoo, Peter S; Long, Theodore; Rosenthal, Marjorie; Berg, David; Curry, Leslie; Nunez-Smith, Marcella
2015-10-01
High rates of attrition from general surgery residency may threaten the surgical workforce. We sought to gain further insight regarding resident motivations for leaving general surgery residency. We conducted in-depth interviews to generate rich narrative data that explored individual experiences. An interdisciplinary team used the constant comparative method to analyze the data. Four themes characterized experiences of our 19 interviewees who left their residency program. Participants (1) felt an informal contract was breached when clinical duties were prioritized over education, (2) characterized a culture in which there was no safe space to share personal and programmatic concerns, (3) expressed a scarcity of role models who demonstrated better work-life balance, and (4) reported negative interactions with authority resulting in a profound loss of commitment. As general surgery graduate education continues to evolve, our findings may inform interventions and policies regarding programmatic changes to boost retention in surgical residency. Copyright © 2015 Elsevier Inc. All rights reserved.
Cross-cultural organizational behavior.
Gelfand, Michele J; Erez, Miriam; Aycan, Zeynep
2007-01-01
This article reviews research on cross-cultural organizational behavior (OB). After a brief review of the history of cross-cultural OB, we review research on work motivation, or the factors that energize, direct, and sustain effort across cultures. We next consider the relationship between the individual and the organization, and review research on culture and organizational commitment, psychological contracts, justice, citizenship behavior, and person-environment fit. Thereafter, we consider how individuals manage their interdependence in organizations, and review research on culture and negotiation and disputing, teams, and leadership, followed by research on managing across borders and expatriation. The review shows that developmentally, cross-cultural research in OB is coming of age. Yet we also highlight critical challenges for future research, including moving beyond values to explain cultural differences, attending to levels of analysis issues, incorporating social and organizational context factors into cross-cultural research, taking indigenous perspectives seriously, and moving beyond intracultural comparisons to understand the dynamics of cross-cultural interfaces.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herk, Anastasia; Poerschke, Andrew
The New York State Energy Research and Development Authority (NYSERDA) is interested in finding cost-effective solutions for deep energy retrofits (DERs) related to exterior wall insulation in a cold climate, with targets of 50% peak load reduction and 50% space conditioning energy savings. The U.S. Department of Energy Building America team, IBACOS, in collaboration with GreenHomes America, Inc. (GHA), was contracted by NYSERDA to research exterior wall insulation solutions. In addition to exterior wall insulation, the strategies included energy upgrades where needed in the attic, mechanical and ventilation systems, basement, band joist, walls, and floors. Under Building America, IBACOS ismore » studying the impact of a “thermal enclosure” DER on the sizing of the space conditioning system and the occupant comfort if the thermal capacity of the heating and cooling system is dramatically downsized without any change in the existing heating and cooling distribution system (e.g., size, tightness and supply outlet configurations).« less
Results from an Independent View on The Validation of Safety-Critical Space Systems
NASA Astrophysics Data System (ADS)
Silva, N.; Lopes, R.; Esper, A.; Barbosa, R.
2013-08-01
The Independent verification and validation (IV&V) has been a key process for decades, and is considered in several international standards. One of the activities described in the “ESA ISVV Guide” is the independent test verification (stated as Integration/Unit Test Procedures and Test Data Verification). This activity is commonly overlooked since customers do not really see the added value of checking thoroughly the validation team work (could be seen as testing the tester's work). This article presents the consolidated results of a large set of independent test verification activities, including the main difficulties, results obtained and advantages/disadvantages for the industry of these activities. This study will support customers in opting-in or opting-out for this task in future IV&V contracts since we provide concrete results from real case studies in the space embedded systems domain.
SOFIA primary mirror fabrication and testing
NASA Astrophysics Data System (ADS)
Geyl, Roland; Tarreau, Michel; Plainchamp, Patrick
2001-12-01
The Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint American-German project dedicated to performing IR astronomy on board a Boeing Aircraft, in near space condition. First flight of the Observatory is planned for 2003. The REOSC Products Unit of SAGEM SA (France) has been contracted by Kayser Threde (Germany) for the design and fabrication of the 2.7-meter diameter, F/1.19 parabolic lightweight SOFIA primary mirror as well as the M3 dichroic and folding mirror assembly. This paper will report the design, fabrication and test of the lightweight primary mirror. The mirror structure has been obtained by machining it out from a solid Zerodur blank. It is the world's largest of this type today. Axial and lateral mirror support system has been conceptually designed and engineered by SAGEM-REOSC engineers in relation with Kayser Threde team. The optical surface is an F/1.19 parabola polished to a high level of quality.
Validation of Numerical Two-Fluid and Kinetic Plasma Models
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel Barnes
This was a four year grant commencing October 1, 2003 and finishing September 30, 2007. The funding was primarily used to support the work of the Principal Investigator, who collaborated with Profs. Scott Parker and John Cary at U. Colorado, and with two students, N. Xiang and J. Cheng also of U. Colorado. The technical accomplishments of this grant can be found in the publications listed in the final Section here. The main accomplishments of the grant work were: (1) Development and implementation of time-implicit two-fluid simulation methods in collaboration with the NIMROD team; and (2) Development and testing ofmore » a new time-implicit delta-f, energy-conserving method The basic two-fluid method, with many improvements is used in present NIMROD calculations. The energy-conserving delta-f method is under continuing development under contract between Coronado Consulting, a New Mexico sole proprietorship and the Oak Ridge National Laboratory.« less
NASA Damage Map Aids FEMA's Hurricane Maria Rescue Operation in Puerto Rico
2017-09-26
The Advanced Rapid Imaging and Analysis (ARIA) team at NASA's Jet Propulsion Laboratory in Pasadena, California, and Caltech, also in Pasadena, created this Damage Proxy Map (DPM) depicting areas of Eastern Puerto Rico that are likely damaged (shown by red and yellow pixels) as a result of Hurricane Maria (a Category 4 hurricane at landfall in Puerto Rico on Sept. 20, 2017). The map is derived from synthetic aperture radar (SAR) images from the Copernicus Sentinel-1A and Sentinel-1B satellites, operated by the European Space Agency (ESA). The images were taken before (March 25, 2017) and after (Sept. 21, 2017) the storm's landfall. The map was delivered to responding agencies, including the Federal Emergency Management Agency (FEMA), on Sept. 22, 2017. FEMA combined the map with building infrastructure data to estimate a damage density map, which was sent to its Urban Search and Rescue teams in the field in Puerto Rico. The map covers an area of 105 by 60 miles (169 by 96 kilometers), shown by the large red polygon in the figure. The inset, denoted by the orange rectangle, shows the extent of damage in and around the capital city of San Juan. Each pixel measures about 98 feet (30 meters) across. The color variation from yellow to red indicates increasingly more significant ground surface change. Preliminary validation was done by comparing the map with anecdotal reports of damage. This damage proxy map should be used as guidance to identify damaged areas, and may be less reliable over vegetated and flooded areas. Sentinel-1 data were accessed through the Copernicus Open Access Hub. The image contains modified Copernicus Sentinel data (2017), processed by ESA and analyzed by the NASA-JPL/Caltech ARIA team. This research was carried out at JPL under a contract with NASA. https://photojournal.jpl.nasa.gov/catalog/PIA21964
DOE Office of Scientific and Technical Information (OSTI.GOV)
Apfelbaum, Steven L.; Duvall, Kenneth W.; Nelson, Theresa M.
Through the Phase I study segment of contract #DE-NT0006644 with the U.S. Department of Energy’s National Energy Technology Laboratory, Applied Ecological Services, Inc. and Sterling Energy Services, LLC (the AES/SES Team) explored the use of constructed wetlands to help address stresses on surface water and groundwater resources from thermoelectric power plant cooling and makeup water requirements. The project objectives were crafted to explore and develop implementable water conservation and cooling strategies using constructed wetlands (not existing, naturally occurring wetlands), with the goal of determining if this strategy has the potential to reduce surface water and groundwater withdrawals of thermoelectric powermore » plants throughout the country. Our team’s exploratory work has documented what appears to be a significant and practical potential for augmenting power plant cooling water resources for makeup supply at many, but not all, thermoelectric power plant sites. The intent is to help alleviate stress on existing surface water and groundwater resources through harvesting, storing, polishing and beneficially re-using critical water resources. Through literature review, development of conceptual created wetland plans, and STELLA-based modeling, the AES/SES team has developed heat and water balances for conventional thermoelectric power plants to evaluate wetland size requirements, water use, and comparative cooling technology costs. The ecological literature on organism tolerances to heated waters was used to understand the range of ecological outcomes achievable in created wetlands. This study suggests that wetlands and water harvesting can provide a practical and cost-effective strategy to augment cooling waters for thermoelectric power plants in many geographic settings of the United States, particularly east of the 100th meridian, and in coastal and riverine locations. The study concluded that constructed wetlands can have significant positive ancillary socio-economic, ecosystem, and water treatment/polishing benefits when used to complement water resources at thermoelectric power plants. Through the Phase II pilot study segment of the contract, the project team partnered with Progress Energy Florida (now Duke Energy Florida) to quantify the wetland water cooling benefits at their Hines Energy Complex in Bartow, Florida. The project was designed to test the wetland’s ability to cool and cleanse power plant cooling pond water while providing wildlife habitat and water harvesting benefits. Data collected during the monitoring period was used to calibrate a STELLA model developed for the site. It was also used to inform management recommendations for the demonstration site, and to provide guidance on the use of cooling wetlands for other power plants around the country. As a part of the pilot study, Duke Energy is scaling up the demonstration project to a larger, commercial scale wetland instrumented with monitoring equipment. Construction is expected to be finalized in early 2014.« less
Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Crocker, Andrew M.; Greene, William D.
2017-01-01
The stated goals of NASA's Research Announcement for the Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS and enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. Dynetics, Inc. and Aerojet Rocketdyne (AR) formed a team to offer a wide-ranging set of risk reduction activities and full-scale, system-level demonstrations that support NASA's ABEDRR goals. During the ABEDRR effort, the Dynetics Team has modified flight-proven Apollo-Saturn F-1 engine components and subsystems to improve affordability and reliability (e.g., reduce parts counts, touch labor, or use lower cost manufacturing processes and materials). The team has built hardware to validate production costs and completed tests to demonstrate it can meet performance requirements. State-of-the-art manufacturing and processing techniques have been applied to the heritage F-1, resulting in a low recurring cost engine while retaining the benefits of Apollo-era experience. NASA test facilities have been used to perform low-cost risk-reduction engine testing. In early 2014, NASA and the Dynetics Team agreed to move additional large liquid oxygen/kerosene engine work under Dynetics' ABEDRR contract. Also led by AR, the objectives of this work are to demonstrate combustion stability and measure performance of a 500,000 lbf class Oxidizer-Rich Staged Combustion (ORSC) cycle main injector. A trade study was completed to investigate the feasibility, cost effectiveness, and technical maturity of a domestically-produced engine that could potentially both replace the RD-180 on Atlas V and satisfy NASA SLS payload-to-orbit requirements via an advanced booster application. Engine physical dimensions and performance parameters resulting from this study provide the system level requirements for the ORSC risk reduction test article. The test article is scheduled to complete fabrication and assembly soon and continue testing through late 2019. Dynetics has also designed, developed, and built innovative tank and structure assemblies using friction stir welding to leverage recent NASA investments in manufacturing tools, facilities, and processes, significantly reducing development and recurring costs. The full-scale cryotank assembly was used to verify the structural design and prove affordable processes. Dynetics performed hydrostatic and cryothermal proof tests on the assembly to verify the assembly meets performance requirements..
NASA Technical Reports Server (NTRS)
Evertt, Shonn F.; Collins, Michael; Hahn, William
2008-01-01
The International Space Station (ISS) Configuration Analysis Modeling and Mass Properties (CAMMP) Team is presenting a demo of certain CAMMP capabilities at a Booz Allen Hamilton conference in San Antonio. The team will be showing pictures of low fidelity, simplified ISS models, but no dimensions or technical data. The presentation will include a brief description of the contract and task, description and picture of the Topology, description of Generic Ground Rules and Constraints (GGR&C), description of Stage Analysis with constraints applied, and wrap up with description of other tasks such as Special Studies, Cable Routing, etc. The models include conceptual Crew Exploration Vehicle (CEV) and Lunar Lander images and animations created for promotional purposes, which are based entirely on public domain conceptual images from public NASA web sites and publicly available magazine articles and are not based on any actual designs, measurements, or 3D models. Conceptual Mars rover and lander are completely conceptual and are not based on any NASA designs or data. The demonstration includes High Fidelity Computer Aided Design (CAD) models of ISS provided by the ISS 3D CAD Team which will be used in a visual display to demonstrate the capabilities of the Teamcenter Visualization software. The demonstration will include 3D views of the CAD models including random measurements that will be taken to demonstrate the measurement tool. A 3D PDF file will be demonstrated of the Blue Book fidelity assembly complete model with no vehicles attached. The 3D zoom and rotation will be displayed as well as random measurements from the measurement tool. The External Configuration Analysis and Tracking Tool (ExCATT) Microsoft Access Database will be demonstrated to show its capabilities to organize and track hardware on ISS. The data included will be part numbers, serial numbers, historical, current, and future locations, of external hardware components on station. It includes dates of all external ISS events and flights and the associated hardware changes for each event. The hardware location information does not always reveal the exact location of the hardware, only the general location. In some cases the location is a module or carrier, in other cases it is a WIF socket, handrail, or attach point. Only small portions of the data will be displayed for demonstration purposes.
NASA Astrophysics Data System (ADS)
Yetman, G.; Downs, R. R.
2011-12-01
Software deployment is needed to process and distribute scientific data throughout the data lifecycle. Developing software in-house can take software development teams away from other software development projects and can require efforts to maintain the software over time. Adopting and reusing software and system modules that have been previously developed by others can reduce in-house software development and maintenance costs and can contribute to the quality of the system being developed. A variety of models are available for reusing and deploying software and systems that have been developed by others. These deployment models include open source software, vendor-supported open source software, commercial software, and combinations of these approaches. Deployment in Earth science data processing and distribution has demonstrated the advantages and drawbacks of each model. Deploying open source software offers advantages for developing and maintaining scientific data processing systems and applications. By joining an open source community that is developing a particular system module or application, a scientific data processing team can contribute to aspects of the software development without having to commit to developing the software alone. Communities of interested developers can share the work while focusing on activities that utilize in-house expertise and addresses internal requirements. Maintenance is also shared by members of the community. Deploying vendor-supported open source software offers similar advantages to open source software. However, by procuring the services of a vendor, the in-house team can rely on the vendor to provide, install, and maintain the software over time. Vendor-supported open source software may be ideal for teams that recognize the value of an open source software component or application and would like to contribute to the effort, but do not have the time or expertise to contribute extensively. Vendor-supported software may also have the additional benefits of guaranteed up-time, bug fixes, and vendor-added enhancements. Deploying commercial software can be advantageous for obtaining system or software components offered by a vendor that meet in-house requirements. The vendor can be contracted to provide installation, support and maintenance services as needed. Combining these options offers a menu of choices, enabling selection of system components or software modules that meet the evolving requirements encountered throughout the scientific data lifecycle.
NASA Technical Reports Server (NTRS)
Strand, Albert A.; Jackson, Darryl J.
1992-01-01
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
NASA Astrophysics Data System (ADS)
Strand, Albert A.; Jackson, Darryl J.
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
Progress in Decommissioning the Humboldt Bay Power Plant - 13604
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less
Frequent premature ventricular contractions in an orbital spaceflight participant.
Jennings, Richard T; Stepanek, Jan P; Scott, Luis R; Voronkov, Yury I
2010-06-01
Commercial spaceflight participants on orbital flights typically are older than career astronauts and they often have medical conditions that have not been studied at high g or in microgravity. This is a case report of a 56-yr-old orbital spaceflight participant with essential tremor and frequent premature ventricular contractions that occurred at rates up to 7000 per day. Before training and spaceflight, he was required to complete extensive clinical investigations to demonstrate normal cardiac structures and the absence of cardiac pathology. The evaluation included signal averaged ECG, transthoracic stress echocardiography, exercise tolerance tests, electrophysiological studies, cardiac MRI, electron beam CT, Holter monitoring, and overnight oximetry. While no cardiac pathology was demonstrated, the Russian medical team required that the PVCs be treated prior to training and spaceflight. For the initial flight, a selective beta-1 receptor beta blocker was used and for the second a calcium channel blocker was used in combination with a nonselective beta blocker for tremor control. Analogue environment testing assured that this combination of medications was compatible. The spaceflight participant's PVCs were incompletely suppressed with a low-dose selective beta-1 blocker, but were well suppressed by a calcium channel blocker. He tolerated in-flight periodic use of a nonselective beta blocker in combination with a calcium channel blocker. In-flight ECG and blood pressure monitoring results were normal, and an ECG obtained midmission and on landing day showed successful PVC suppression. He did not have any cardiac difficulty with launch, on-orbit operations, entry, or recovery